Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
FREDERICK A. BRADY AND JANET B. BRADY vs KENNETH ACRE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-002608 (1991)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Apr. 25, 1991 Number: 91-002608 Latest Update: Jul. 22, 1992

The Issue The issues are whether the Consent Order entered into between the Department of Environmental Regulation (DER) and Kenneth Acre (Acre) is an appropriate settlement of the violations addressed therein and whether Acre is entitled to construction permit number IC35-190005 for an Industrial Waste Disposal Facility. The Bradys assert that the Consent Order is not a reasonable exercise of DER's enforcement discretion and that the permit should be denied.

Findings Of Fact Background Acre owns and operates an animal research facility in Eustis, Florida. Acre performs research trials on dogs using a USDA approved heartworm medication sold under the brand name of Heartguard, the chemical name of which is ivermectin. Acre is not in the business of testing or manufacturing new drugs. The Consent Order To handle the waste generated by the animals at the facility, Acre initially constructed a conventional septic tank system. Prior to construction, Acre contacted the Lake County health department to inquire about permitting and was told that he did not need a permit for his facility. With that information, he continued with the project. Subsequently, DER became aware of the facility and notified Acre that a DER industrial waste permit was required and that he should cease the discharge into the septic tank until such a permit was obtained. Acre complied with DER's instructions and plugged the septic tanks. Since the time the septic tanks were plugged, the waste has been collected by Roto Rooter on a periodic basis and disposed of offsite. Acre entered into a Consent Order with DER to resolve the alleged past violation for not obtaining a permit and paid of penalty of $600 as required by DER. The Consent Order is a reasonable and appropriate settlement of the violations alleged therein. The Disposal System Acre has applied for a permit to construct and operate an evapotranspiration disposal system to dispose of the waste from his facility on site. The proposed system is essentially a modified septic tank system using a lined drainfield to capture and hold the liquid waste, allowing it to transpire from the grass or otherwise evaporate into the atmosphere and preventing any discharge to groundwater. The waste will be discharged to a series of modified septic tanks which will provide treatment beyond that of a traditional septic tank system and will reduce the amount of total suspended solids. The first septic tank accepts the waste and provides initial treatment through natural settling of solids. The waste then passes through a filter device and travels by gravity flow to the second septic tank. From the second tank it flows through a second filter device and into a dosing tank. The dosing tank is basically a small holding basin with a pump that disperses the waste to the drainfield in incremental amounts. The dosing tank contains several float mechanisms which monitor the level of liquid in the tank. When the water level in the dosing tank reaches a certain level, one such float mechanism turns on the pump to transport the liquid to the drainfield. The waste is then pumped from the dosing tank through a closed pipe to one of two evapotranspiration cells where it is distributed through a number of perforated pipes. The Evapotranspiration Cells The perforated pipes are situated in a gravel bed approximately 24 inches in depth. On top of the gravel bed is a clay soil mix approximately 15 inches deep. The clay soil mix absorbs the liquid waste in the gravel bed by drawing it up through the process of capillarity. Once the liquid is in the upper clay soil layer, it is evaporated. Grass is planted on top of the soil mix as an additional method for dissipation of the waste. The liquid waste is absorbed by the roots of the grass and transpired through the grass leaves. The clay soil mix in the top layer of the system is relatively impervious. The impervious nature of the soil mix along with a three percent surface slope will prevent rain water from entering the evapotranspiration cells and impacting the effective operation of the system. The entire drainfield has a double liner: one PVC plastic liner and a 6" clay layer. These two liners will ensure that no discharge to groundwater will occur from the system. System Capacity It is estimated that the Acre facility will produce approximately 520 gallons per day (GPD) of waste to be handled by the system. The drainfield is designed to handle twice the volume that will be discharged by the Acre facility and is therefore more than adequate to assimilate the waste received into the system. The drainfield is composed of two independent cells so that loading of each cell will be rotated. Once one cell receives its maximum capacity, the loading of that cell will cease in order to allow that cell to assimilate the waste through evapotranspiration. In this manner, the first cell is permitted to "rest" while the second cell receives further loading from the dosing tank. Safety Features Although the proposed disposal system is innovative in design, it incorporates several safety features which will ensure that no overflow of waste will occur. First, a float mechanism in the dosing tank is designed to trigger an alarm in the event the water level in the dosing tank gets too high. If that occurs, the alarm provides a flashing light as well as a horn which will notify the operator of a problem. Once the float reaches this warning level, the system will automatically shut down, thus preventing further waste from entering the system. Second, each evapotranspiration cell is equipped with a similar device which will automatically close off the dosing tanks and prevent further discharge into the cells in the unlikely event the system were to become too saturated to accept further loading. Finally, the double lined drainfield provides an additional safety measure which will prevent any discharge to groundwater. The numerous permit conditions requiring periodic monitoring of water quantity and quality in the system itself as well as the groundwater in the vicinity of the system provide ample assurance that the system will not pose a threat to the state's water resources. Ivermectin Although the proposed system will not discharge to groundwater, DER required the applicant to determine the amount of ivermectin in the wastestream. Ivermectin binds tightly to soil and does not dissolve in water. A sample of the wastestream from the Acre facility was collected by Bionomics Laboratory, Inc., and analyzed by Analytical Development Corporation using the analytical procedure designed by Merck scientists. The results of this analysis show that the concentration of ivermectin in the Acre wastestream ranges from .6 to 6.1 parts per trillion (ppt). The publication submitted to the Department by Acre entitled, Chapter 11, "Environmental Aspects of Ivermectin Usage in Livestock: General Considerations" by Halley, Nessel and Lu, from William C. Campbell, Ivermectin and Abamectin, documents the results of studies designed to determine whether using ivermectin in animals would result in any harmful or undesirable effects on the environment through excretion in the feces. This publication indicates that: Ivermectin is relatively immobile in soil and will not readily translocate into groundwater. Ivermectin is rapidly decomposed by sunlight and therefore will not accumulate in soil when administered to livestock. Ivermectin has no effect on earthworms at a concentration in soil of 12 parts per million (ppm). (This concentration is approximately two million times higher than that of the Acre waste stream.) Aquatic organisms such as water fleas and fish are highly sensitive to ivermectin toxicity. However, ivermectin is not toxic to the most sensitive species, the Daphnia magna, at a concentration of 0.01 parts per billion (ppb). Ivermectin concentrations in cattle feedlot runoff was less than the no-effect level of 0.01 ppb for Daphnia magna and therefore should cause no adverse environmental effects in surface or subsurface waters. The highest concentration of ivermectin found in the Acre waste stream is 6.1 ppt (or .006 ppb), which is less than the 0.01 ppb non-toxic level for the most sensitive aquatic species. Based on the concentration of ivermectin found in the Acre waste stream and the fact that ivermectin binds tightly to soil, the discharge from the Acre facility would not cause any adverse environmental impact, even if it were discharged to groundwater. Bradys' case Bradys submitted no evidence to show that the Consent Order is not an appropriate settlement of the violations alleged therein. They submitted no evidence that the septic tanks were improperly plugged. Brady offered no expert testimony in support of their claim that the facility had caused an adverse impact to groundwater or that the proposed system would cause any threat to groundwater quality. Bradys apparent concern about standing surface water on their property during heavy rainfalls is not relevant to this proceeding. Their concern that the lining of the drainfield could leak is unsupported by competent evidence. Bradys learned immediately prior to hearing that DER had changed its position and intended to issue the permit. Their failure to present any relevant evidence that the Consent Order was insufficient or that the proposed facility would violate any applicable DER rules or criteria and their ill- prepared participation in the hearing was in part the result of DER's late change in position. Bradys' participation in this proceeding was not shown to be frivolous.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department of Environmental Regulation enter a Final Order and therein: Ratify the terms of the Consent Order as reasonable. Grant Acre construction permit number IC35-190005 for an Industrial Waste Disposal Facility, subject to the special conditions set forth in DER Exhibit 1. RECOMMENDED this 22nd day of July, 1992, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of July, 1992. APPENDIX TO RECOMMENDED ORDER CASE NOS. 91-2608, 92-0958 AND 92-0959 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioners, Bradys 1. Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 6 & 7(8) and 15(10). 2. Proposed findings of fact 1-5, 16, 27, 28, 31, 36-42, 44, 46-49, 51, 52, 54, 57-59, 61, and 62 are subordinate to the facts actually found in the Recommended Order. 3. Proposed findings of fact 8, 10-14, 17, 19-21, 26, 29, 30, 32, 33, 35, 43, 53, 55, and 56 are irrelevant. Proposed findings of fact 9, 18, 22-25, 45, and 50 are unnecessary. Proposed findings of fact 34 and 60 are unsupported by the competent and substantial evidence. Specific Rulings on Proposed Findings of Fact Submitted by Respondents, Acre and DER Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1-44(1-44). Proposed findings of fact 45 and 46 are unsupported by the competent and substantial evidence. COPIES FURNISHED: Carlyn H. Kowalsky, Attorney at Law Bogin, Munns & Munns 250 North Orange Avenue 11th Floor-P.O. Box 2807 Orlando, FL 32802 Douglas MacLaughlin, Attorney at Law Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Martha Hunter Formella Attorney at Law FOLEY & LARDNER Post Office Box 2193 Orlando, FL 32802-2193 Carol Browner, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (3) 120.57403.087403.412
# 1
GREENSPACE PRESERVATION ASSOCIATION, INC.; FRANK WARD; SAL LOCASCIO; FREDERICK P. PETERKIN; AND HAROLD M. STAHMER vs ST. JOHNS RIVER WATER MANAGEMENT DISTRICT AND CITY OF GAINESVILLE, 97-002845 (1997)
Division of Administrative Hearings, Florida Filed:Gainesville, Florida Jun. 13, 1997 Number: 97-002845 Latest Update: Jul. 12, 2004

The Issue The issue is whether the City's applications for an individual stormwater permit and a noticed general environmental resource permit for Phase 1A of the proposed Hogtown Creek Greenway should be approved.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In these two cases, Respondent, City of Gainesville (City), seeks the issuance of a stormwater system management permit (stormwater permit) to construct a 2,000-foot long asphaltic trail/boardwalk, a parking facility and associated improvements for Phase 1A of the Hogtown Creek Greenway project in the north central portion of the City. That matter is docketed as Case No. 97-2845. The City also seeks the issuance of a noticed general environmental resource permit (NGP) to construct 481 square feet of piling supported structures over wetlands or surface waters for the same project. That matter has been assigned Case No. 97-2846. Respondent, St. Johns River Water Management District (District), is the regulatory agency charged with the responsibility of reviewing and approving the requested permits. Petitioner, Greenspace Preservation Association, Inc., is a not-for-profit Florida corporation primarily composed of persons who own real property adjacent to the route proposed by the City, as well as local environmental interests. Petitioners, Frank Ward, Sal Locascio, Frederick P. Peterkin, and Harold M. Stahmer, are individuals who own real property adjacent to the route proposed by the City for the Greenway. The parties have stipulated that Petitioners are substantially affected by the District's proposed action and thus have standing to initiate these cases. On March 28, 1997, the City filed applications for a stormwater permit and a NPG for Phase IA of the Hogtown Creek Greenway project. After conducting a review of the applications, including an on-site visit to the area, in May 1997, the District proposed to issue the requested permits. On June 9, 1997, Petitioners timely filed a Petition for Initiation of Formal Proceedings as to both intended actions. As amended and then refined by stipulation, Petitioners generally allege that, as to the stormwater permit, the City has failed to provide reasonable assurance that the project meets the permitting requirements of the District; the City has failed to provide reasonable assurance that the stormwater system will not cause violations of state water quality standards; the City has failed to provide reasonable asurance that the project satisfies the District's minimum required design features; and the City has failed to provide reasonable assurance that the stormwater system is capable of being effectively operated and maintained by the City. As to the NPG, Petitioners generally allege that the piling supported structure is not less than 1,000 square feet; the jurisdictional wetlands are greater than the area shown on the plans submitted by the City; the City has failed to provide reasonable assurance that the system will not significantly impede navigation; the City has failed to provide reasonable assurance that the system does not violate state water quality standards; the City has failed to provide reasonable assurance that the system does not impede the conveyance of a watercourse in a manner that would affect off-site flooding; the City has failed to provide reasonable assurance that the system will not cause drainage of wetlands; and the City failed to provide reasonable assurance that the system does not adversely impact aquatic or wetland dependent listed species. Respondents deny each of the allegations and aver that all requirements for issuance of the permits have been met. In addition, the City has requested attorney's fees and costs under Section 120.595(1)(b), Florida Statutes (Supp. 1996), on the theory that these actions were filed for an improper purpose. A General Description of the Project The Hogtown Creek Greenway is a long-term project that will eventually run from Northwest 39th Street southward some seven miles to the Kanapaha Lake/Haile Sink in southwest Gainesville. These cases involve only Phase 1A of that project, which extends approximately one-half mile. This phase consists of the construction of a 2,000-foot long asphaltic concrete trail/boardwalk, a timber bridge and boardwalk, a parking facility, and associated improvements. The trail will extend from the Loblolly Environmental Facility located at Northwest 34th Street and Northwest 5th Avenue, to the intersection of Northwest 8th Avenue and Northwest 31st Drive. The trail will have a typical width of ten feet. For the majority of its length, the trail will be constructed of asphaltic concrete overlying a limerock base, and it will generally lie at the existing grade and slope away from the creek. Besides the trail, additional work involves the repaving of Northwest 5th Avenue with the addition of a curb and gutter, the construction of an entrance driveway, paved and grassed parking areas, and sidewalks at the Loblolly Environmental Facility, and the widening and addition of a new turn lane and pedestrian crosswalk at the intersection of Northwest 8th Avenue and Northwest 31st Drive. The Stormwater Permit Generally The entire Phase IA project area lies within the Hogtown Creek 10-year floodplain. It also lies within the Hogtown Creek Hydrologic Basin, which basin includes approximately 21 square miles. The project area for the proposed stormwater permit is 4.42 acres. Water quality criteria Phase IA of the Greenway will not result in discharges into surface groundwater that cause or contribute to violations of state water quality standards. When a project meets the applicable design criteria under the District's stormwater rule, there is a presumption that the project will not cause a violation of state water quality standards. There are two dry retention basins associated with the project. Basin 1 is located at the cul-de-sac of Northwest 5th Avenue and will capture and retain the stormwater runoff from the new and reconstructed impervious areas at the Loblolly Facility. Basin 2 is located at the parking area and will capture and retain stormwater runoff at the existing building and proposed grass parking area. Under the stormwater rule, the presumptive criteria for retention basins require that the run-off percolate out of the basin bottom within 72 hours. The calculations performed by the City's engineer show that the two retention basins will recover within that timeframe. In making these calculations, the engineer used the appropriate percolation rate of ten inches per hour. Even using the worst case scenario with a safety factor of twenty and a percolation rate of one-half inch per hour, the two retention basins will still recover within 72 hours. The presumptive criteria for retention basins require that the basin store a volume equal to one inch of run-off over the drainage area or 1.25 inches of run-off over the impervious area plus one-half inch of run-off over the drainage area. The calculations performed by the City's engineer show that the two retention basins meet the District's volume requirements for retention systems. An applicant is not required to utilize the presumptive design criteria, but instead may use an alternative design if the applicant can show, based on calculations, tests, or other information, that the alternative design will not cause a violation of state water quality standards. As a general rule, the District applies its stormwater rule so that water quality treatment is not required for projects or portions of projects that do not increase pollutant loadings. This includes linear bicycle/pedestrian trails. The City's proposed trail will not be a source of pollutants. The City will install signs at both entrances to the trail to keep out motorized vehicles. Except for emergency and maintenance vehicles, motorized vehicles will not be permitted on the trail. The infrequent use by emergency or maintenance vehicles will not be sufficient to create water quality concerns. The construction of a treatment system to treat the stormwater from the trail would provide little benefit and would only serve to unnecessarily impact natural areas. Although treatment of the stormwater run-off from the trail portion of the project is not required under District rules, the run-off will receive treatment in the vegetated upland buffer adjacent to the trail. The District's proposed other condition number 3 will require the City to plant vegetation in unvegetated and disturbed areas in the buffer. This will reduce the likelihood of erosion or sedimentation problems in the area of the trail. Although disputed at hearing, it is found that the City's engineer used the appropriate Manning coefficient in the calculations regarding the buffer. Even without a vegetated buffer, run-off coming from the bicycle trail will not violate state water quality standards. The City will install appropriate erosion and sediment controls. These include siltation barriers along the entire length of both sides of the proposed trail prior to commencing construction. Such barriers will not allow silt or other material to flow through, over, or under them. The City will also place hay bales and any other silt fencing necessary to solve any erosion problem that may occur during construction. In addition, the permit will require an inspection and any necessary repairs to the siltation barriers at the end of each day of construction. Saturation of the limerock bed under the paved portion of the trail is not expected to cause a problem because heavy vehicles will not regularly use the trail. The trail portion of the project can be adequately maintained to avoid deterioration. Sensitive Karst Areas Basin criteria The two proposed dry retention basins for Phase 1A are located within the District's Sensitive Karst Areas Basin. They include all of the minimum design features required by the District to assure adequate treatment of the stormwater before it enters the Floridan aquifer and to preclude the formation of solution pipe sinkholes in the stormwater system. There will be a minimum of three feet of unconsolidated soil material between the surface of the limestone bedrock and the bottom and sides of the two retention basins. The appropriate mechanism for determining the depth of limestone is to do soil borings. The soil borings performed by the City show that there is at least three feet of unconsolidated material between the bottom of the basins and any limerock where the borings were taken. In other words, limestone would not be expected to be within three feet of the bottom of either basin. Based on the soil boring results, the seasonal high water table is at least six feet below ground level. The depth of the two retention basins will be less than ten feet. Indeed, the depth of the basins will be as shallow as possible and will have a horizontal bottom with no deep spots. To make the retention basins any larger would require clearing more land. A large shallow basin with a horizontal bottom results in a lower hydraulic head and therefore is less potential for a sinkhole to form. Before entering the basins, stormwater will sheet flow across pavement and into a grass swale, thereby providing some dispersion of the volume. Finally, the two retention basin side slopes will be vegetated. Special condition number 7 provides that if limestone is encountered during excavation of a basin, the City must over- excavate the basin and backfill with three feet of unconsolidated material below the bottom of the basin. Drainage and flood protection Contrary to Petitioners' assertions, the project will not adversely affect drainage or flood protection on surrounding properties. The trail will be constructed generally at existing grade. Because the trail will be constructed at existing grade, the net volume of fill necessary for Phase 1A is approximately zero. Therefore, there will not be a measurable increase in the amount of runoff leaving the site after construction, and the trail will not result in an increase in off-site discharges. District rules require that the proposed post- development peak rate of discharge from a site not exceed the pre-development peak rate of discharge for the mean annual storm only for projects that exceed fifty percent impervious surface. The proposed project has less than fifty percent impervious surface. Even though it is not required, the City has demonstrated that the post-development rate of discharge will not exceed the pre-development peak rate of discharge. Both basins will retain the entire mean annual storm so that the post-development rate of discharge is zero. Even during a 100-year storm event, the retention basins willl not discharge. Therefore, there will not be any increase in floodplain elevations during the 10, 25, or 100-year storm events from the proposed project. Operation and maintenance entity requirements The applicable requirements of Chapter 40C-42, Florida Administrative Code, regarding operation and maintenance, have been met by the applicant. The City proposes itself as the permanent operation and maintenance entity for the project. This is permissible under District regulations. The duration for the operation and maintenance phase of the permit is perpetual. The City has adequate resources and staff to maintain the phase 1A portion of the project. The public works department will maintain the stormwater management system out of the City's utility fund. The City provides periodic inspections of all of its stormwater systems. These inspections are paid for out of the collected stormwater fees. The City will also conduct periodic inspections of the project area, and the two retention basins will be easily accessed by maintenance vehicles. The City will be required to submit an as-built certification, signed and sealed by a professional engineer, once the project is constructed. Monthly inspections of the system must be conducted looking for any sinkholes or solution cavities that may be forming in the basins. If any are observed, the City is required to notify the District and repair the cavity or sinkhole. Once the system is constructed, the City will be required to submit an inspection report biannually notifying the District that the system is operating and functioning in accordance with the permitted design. If the system is not functioning properly, the applicant must remediate the system. The City will be required to maintain the two retention basins by mowing the side slopes, repairing any erosion on the side slopes, and removing sediment that accumulates in the basins. Mowing will be done at least six times per year. The City will stabilize the slopes and bottom areas of the basins to prevent erosion. The City has a regular maintenance schedule for stormwater facilities. The project will be included within the City's regular maintenance program. The City has budgeted approximately $80,000.00 for maintenance of the trail and vegetated buffer. Also, it has added new positions in its budget that will be used to maintain and manage the Greenway system. Finally, City staff will conduct daily inspections of the Phase 1A trail looking for problems with the vegetated buffer, erosion problems along the trail, and sediment and debris in the retention basin. If the inspections reveal any problems, the staff will take immediate action to correct them. The Noticed General Environmental Resource Permit Generally By this application, the City seeks to construct 481 square feet of piling supported structures over wetlands or surface waters. The proposed structures include a 265 square foot timber bridge over an un-vegetated flow channel, which connects a borrow area to Possum Creek, and a 216 square foot boardwalk over two small wetland areas located south of the flow channel. None of the pilings for the bridge or boardwalk will be in wetlands, and no construction will take place in Hogtown or Possum Creeks. The paved portion of the trail will not go through wetlands, and there will be no dredging or filling in wetlands. The receiving waters for the project are Hogtown and Possum Creeks. Both are Class III waters. Hogtown Creek originates in north central Gainesville and flows southwest to Kanapaha Lake/Haile Sink in southwest Gainesville. Possum Creek originates in northwest Gainesville and flows southeast to its confluence with Hogtown Creek south of the proposed bridge structure. Wetlands The total area of the proposed bridge and boardwalk over surface water or wetlands is approximately 481 square feet. The wetland delineation shown on the City's Exhibit 5A includes all of the areas in the project area considered to be wetlands under the state wetland delineation methodology. The United State Army Corps of Engineers' wetland line includes more wetlands than the District wetland line. The former wetland line was used to determine the area of boardwalk and bridge over wetlands. Even using this line, however, the total area of boardwalk over surface waters or wetlands is approximately 481 square feet and is therefore less than 1,000 square feet. Navigation The proposed system does not significantly impede navigation. Further, the structures will span a wetland area and an un-vegetated flow channel, both of which are non-navigable. In fact, the flow channel generally exhibits little or no flow except after periods of rainfall. Water quality The construction material that will be used for the bridge and boardwalk will not generate any pollutants. Morever, chemical cleaners will not be used on those structures. Silt fences will be used and vegetation will be planted in the vicinity of the bridge and boardwalk to prevent erosion and sedimentation problems. The amount of erosion from drip that comes off the boardwalk will be minimal. Therefore, the bridge and boardwalk will not cause a violation of state water quality standards. Off-site flooding The project will not impede conveyance of any stream, river, or other water course which would increase off-site flooding. The structures will completely span the wetland areas and flow channel, and no part of the structures, including the pilings, will lie within any water or wetland areas including the flow channel. There will be a span of 2.5 to 3 feet from the horizontal members of the bridge and boardwalk down to the ground surface which will allow water to pass through unobstructed. Further, there will not be any cross ties or horizontal obstructions on the lower portions of the boardwalk or bridge pilings. Further, due to the spacing of the pilings, the boardwalk and bridge will not trap sufficient sediment such as leaves to impede the conveyance of the flow channel. Therefore, conveyance through the flow channel will not be affected by the structures. Because the boardwalk and bridge are not over Hogtown or Possum Creeks, they will not cause any obstruction to the conveyance of the creeks. Aquatic and wetland dependent listed species The project will not adversely affect any aquatic or wetland dependent listed species. These species are defined by District rule as aquatic or wetland dependent species listed in Chapter 39-27, Florida Administrative Code, or 50 Code of Federal Regulations, Part 17. No such species are known to exist in the project area, and none are expected to exist in the location and habitat type of the project area. Therefore, contrary to Petitioners' assertions, there are no listed salamander, frog, turtle, or lizard species known to occur within the Hogtown Creek basin. Although it is possible that the box turtle may be found in the project area, it is not an aquatic or wetland dependent listed species. One baby American alligator (between two and three feet in length) was observed in the borrow pit area of the project on September 11, 1997. Except for this sighting, no other listed animal species have been observed in the project area. As to the alligator, the only area in which it could nest would be in the existing excavated borrow pit, and none of the proposed construction will take place in that area. More than likely, the alligator had walked into the area from Clear Lake, Kanapaha Prairie, or Lake Alice. The proposed structures will not affect the movement of the alligator nor its feeding habits. Drainage of wetlands Because the boardwalk and bridge are elevated structures over waters and wetlands, and the City has not proposed to construct ditches or other drainage systems, the proposed system will not cause drainage of the wetlands. Coral/macro-marine algae/grassbeds The proposed system is not located in, on, or over coral communities, macro/marine algae, or a submerged grassbed community. D. Were the Petitions Filed for an Improper Purpose? Prior to the filing of their petitions, Petitioners did not consult with experts, and they prepared no scientific investigations. Their experts were not retained until just prior to hearing. Petitioners are citizens who have genuine concerns with the project. They are mainly longtime residents of the area who fear that the Greenway will not be properly maintained by the City; it will increase flooding in the area; it will cause water quality violations; and it will attract thousands of persons who will have unimpeded access to the back yards of nearby residents. Although these concerns were either not substantiated at hearing or are irrelevant to District permitting criteria, they were nonetheless filed in good faith and not for an improper purpose.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order approving the applications of the City of Gainesville and issuing the requested permits. DONE AND ENTERED this 19th day of December, 1997, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 19th day of December, 1997. COPIES FURNISHED: Henry Dean, Executive Director St. Johns River Water Management District Post Office Box 1429 Palatka, Florida 32178-1429 Samuel A. Mutch, Esquire 2790 Northwest 43rd Street Suite 100, Meridien Centre Gainesville, Florida 32606 Jennifer B. Springfield, Esquire Mary Jane Angelo, Esquire Post Office Box 1429 Palatka, Florida 32178-1429 Richard R. Whiddon, Jr., Esquire Post Office Box 1110 Gainesville, Florida 32602-1110

Florida Laws (3) 120.57120.59517.12 Florida Administrative Code (6) 40C-4.02140C-400.47540C-41.06340C-42.02340C-42.02740C-42.029
# 2
JOHN E. PILCHER, PHYLLIS REPPEN, ET AL. vs BAY COUNTY AND DEPARTMENT OF COMMUNITY AFFAIRS, 90-000254 (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 16, 1990 Number: 90-000254 Latest Update: Jan. 10, 1992

Findings Of Fact During 1990, Respondent/Applicant, City of Lynn Haven, filed several applications with the Respondent, Department of Environmental Regulation, seeking the issuance of several permits to build a wastewater collection system and a two million gallon per day advanced wastewater treatment (AWT) plant. The proposed facility is intended to replace the wastewater treatment facility currently being used by the City of Lynn Haven. After a review of the applications the Department proposed several Intents to Issue covering the different aspects of the proposed projects. The Intents to Issue included: A) a variance and dredge and fill permit, pursuant to Sections 403.201, 403.918, 403.919, Florida Statutes, and Rule 17-312, Florida Administrative Code, authorizing a subaqueous crossing of North Bay (Class II waters) and installation of a force main (permit #031716641), B) a collection system permit, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-600 and 17-604, Florida Administrative Code, for the installation of approximately 11 miles of pipe from North Bay to the proposed treatment plant, C) a dredge and fill permit #031785181, pursuant to Sections 403.918, 403.919, Florida Statutes, and Rules 17-4, 17-312, Florida Administrative Code, authorizing 10 incidental wetland crossings associated with the collection system, and, D) a construction permit #DC03-178814, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-302, 17-600 and 17-611, Florida Administrative Code, authorizing the construction of a 2.0 mgd wastewater treatment plant. Sand Hill Community Improvement Association challenged the Department's Intents to Issue. The Sand Hill Community Improvement Association (Sand Hill) is an association composed of 74 formal members plus numerous supporters. Both members and supporters are residents who live near the site of the proposed Lynn Haven sewage treatment plant. They are sufficiently close to the plant site that construction of the proposed project could impact their property. The members are very concerned about any threat of pollution to the aquifer from the proposed plant since all of the members are dependent on private wells for their drinking water. Additionally, members of the association use the proposed site, as well as the associated wetlands, Burnt Mill Creek and the nearby lakes, for a variety of recreational purposes, including hunting, fishing, hiking, bird-watching, boating and swimming. Given these facts, the Association has standing to challenge the Department's Intents to Issue involved in this case. The City of Lynn Haven is located on a peninsular section of the south shore of North Bay and, except for its connection to the land, is surrounded by environmentally sensitive Class II or Class I waters. Lynn Haven's existing wastewater treatment plant was poorly designed, has not worked properly, and is old and outdated. The plant is permitted to treat up to 950,000 gallons per day. However, the existing plant is currently exceeding its originally permitted treatment limits and is treating in excess of 1,200,000 gallons per day. The sewage only receives secondary treatment, Secondary treatment is the minimum state standard for wastewater treatment. The secondarily treated wastewater is pumped several miles to a spray irrigation site located in the eastern portion of the City. The sprayfield site has never worked properly due to a high groundwater table and a confining layer of soil, both of which prevent the effluent from percolating into the ground. Because the sewage effluent cannot percolate into the ground, the existing operation frequently results in direct runoff into a ditch which empties into North Bay, a Class II waterbody. Such discharge of wastewater effluent into Class II waters is prohibited by Department regulations. 1/ At this time, the existing wastewater treatment facility is in violation of both DER and EPA standards and is under enforcement action by both agencies. The existing facility is currently operating without a permit and the Department has advised Lynn Haven that the existing facility as it now operates can not be permitted. In fact, all the parties agree that the City is in serious need of a wastewater treatment facility which works and does not pollute the environment. However, the parties disagree over the method by which proper wastewater treatment could be accomplished by Lynn Haven. Since 1972, the City, through various consultants and with the aid of DER, has reviewed approximately 40 alternatives for wastewater disposal. After this review, the City of Lynn Haven selected the alternative which is the subject of this administrative hearing. The alternative selected by the City of Lynn Haven consists of the construction of a proposed advanced wastewater treatment (AWT) plant and distribution system. The new plant will be on a 640 acre parcel of property located approximately 12 miles north of Lynn Haven. The location of the new plant will necessitate the rerouting of the wastewater from the old plant to the new plant by construction of a new transmission line approximately 12 miles north of the City across North Bay and parallel along State Road 77. 2/ The treatment process proposed for use in the new AWT plant is known as the AO2 process. The process is patented. The AO2 treatment process primarily consists of biological treatment with settling and filtration. The treatment process also includes a chemical backup treatment to further reduce phosphorus if necessary. The evidence demonstrated that this type of facility has been permitted by the Department in at least five other wastewater facilities throughout the state. The treatment facility will have a two million gallon per day, lined holding pond on site for the purposes of holding improperly treated wastewater for recirculation through the proposed facility. Any excess sludge generated by this treatment process would be routed to lined, vacuum-assisted, sludge drying beds. The sludge would then be transported offsite to a permitted landfill for disposal. The evidence demonstrated that this treatment process would not produce any objectionable odors. Once the wastewater is treated, it will be disinfected by chlorination to eliminate pathogens. The chlorination process is expected to meet state standards. After chlorination, a dechlorination process would occur to remove any chlorine residuals which would have a harmful affect on the environment. The treated wastewater would then be re-aerated and discharged through the distribution system indirectly into a wetland located on the 640 acre parcel of property. The quality of the treated wastewater is expected to meet the advanced wastewater treatment (AWT) standards. These standards are five milligrams per liter total suspended solids (T.S.S.), five milligrams per liter BOD, three milligrams per liter nitrogen (N), one milligram per liter phophorus (P). Ph will be in the range of six to eight units on an average annual basis and can be adjusted up or down if necessary to meet the ph levels of the ecology into which the wastewater ultimately flows. This effluent quality is approximately five times cleaner than secondarily treated effluent. Additionally, as a condition of the draft permit, the proposed facility would be operated by a state-licensed operator and would be routinely monitored to insure that the treated wastewater effluent meets advanced wastewater treatment standards. Given these facts, the evidence demonstrated that the applicant has supplied reasonable assurances that the plant will perform as represented and that the effluent will meet the state standards for advanced wastewater treatment. As indicated earlier, the site for the proposed AWT plant contains approximately 640 acres and is located approximately 12 miles north of Lynn Haven in an area known locally as the Sand Hills. The City specifically purchased this parcel of property for the construction of the proposed wastewater treatment plant. The plant itself would be located in the northeast corner of the property. The 640 acre site was previously used for silviculture. The entire area is currently planted in pines except for a low area that is dominated by a pristine, woody wetland system of titi. The titi wetland is approximately 212 acres in size and generally runs through the center of the property from the northeast to the southwest. The wetland is low in acidity, with an estimated ph between 4 and 5. The site consists of hilly, mineralized soils. The soils within the forested wetland are organic in nature. Based on the evidence at the hearing, there does not appear to be any significant confining layers of soil which would prevent the treated wastewater from percolating in the soils and draining towards the wetland and ultimately into Burnt Mill Creek, a Class III waterbody. Once the effluent leaves the plant, it would go through a distribution system. The proposed distribution system will consist of six, 500 foot long, 12 inch diameter perforated pipes. Each 500 foot section of pipe has 100 one and one-half inch orifices which will discharge the treated effluent onto an eight foot wide concrete pad. This concrete pad will dissipate the effluent's energy, prevent erosion at the orifice site and insure that the effluent sheetflows onto and eventually into the sandy soils of the plant site and ultimately into the receiving wetland. The distribution pipes are located around the east, north and western portions of the receiving wetland and are variously set back from the receiving wetland approximately 80 to 200 feet. The distribution system is designed with valves to allow for routing of flow to different branches of the system if it is determined through long term monitoring that there is a need to allow for any of the receiving wetland to dry out. None of the distribution branches are located in any jurisdictional wetlands of the State of Florida. The receiving wetland will receive a hydraulic loading rate of approximately 1.8 inches per week once the new advanced wastewater treatment plant is operating at capacity. Both the surface waters and groundwaters on the 640 acre parcel flow from northeast to southwest across the property. The evidence clearly demonstrated that any treated wastewater discharged on the site would move down hill by surface or groundwater flows towards the wetlands in the central portion of the property and eventually discharge into Burnt Mill Creek located at the southwest corner of the parcel. The evidence demonstrated that it would be highly unlikely for the surface or groundwater to move in any other direction and would be unlikely for the surface or groundwater to move towards any residents located to the north or east of this parcel. Evidence of the topography and its relatively sharp gradient clearly demonstrated that the treated wastewater discharged in the northeast corner of this site would not result in any significant still water ponding and would exit the site at the southwest corner of the property in approximately 14 hours. The evidence did demonstrate that, depending on the wetness of the weather, there may likely be certain times of the year when a flowing type of ponding would occur. However, this wet weather ponding was not shown to be of a duration which would impact to a significant degree on the flora and fauna of the area or increase the number of disease bearing mosquitoes in the area. As indicated earlier the treated effluent from the proposed AWT plant will flow into Burnt Mill Creek. Burnt Mill Creek will ultimately carry the treated wastewater approximately 11 miles down stream to North Bay. The City can directly discharge up to two million gallons per day of AWT water into Burnt Mill Creek without violating state water quality standards. Therefore, the volume of wastewater discharged into Burnt Mill Creek should not have significant impacts on surface and ground water quality. Moreover, Chapter 17-611, Florida Administrative Code, authorizes the discharge of up to 2 inches per week to receiving wetlands provided wastewater is treated to AWT standards. The evidence demonstrated that this rule was developed as an experimental effort to determine if wetlands could be appropriate areas for wastewater effluent to be either discharged or treated. These state limits were intended to be very conservative limits and were designed to insure that the impacts to receiving wetlands would be minimal. The evidence and testimony demonstrated that the receiving wetland system involved in this case should not be adversely impacted beyond those limits set forth in Section 17-611.500, Florida Administrative Code, for flora, fauna, macroinvertebrates, fish or vegetation and will meet all standards set forth in Chapter 17-611, Florida Administrative Code. However, it should be noted that the wetland/wastewater program is highly experimental and very little is known about the actual impacts of wetland/wastewater systems since facilities similar to the one proposed by Lynn Haven have not yet been placed in service. The evidence did show that there would be some long term impacts to flora and fauna in the wetland area primarily due to ponding, changed ph and the introduction of nutrients and pollution in the form of the effluent. However, the regulation does allow for some change within a receiving wetland and the evidence did not demonstrate that these changes would be significant or detrimental. Petitioners' own witness concluded that other deep wetland treatment systems are doing a very good job in meeting state water quality standards. Although Petitioners' expert noted potentially adverse impacts to flora and fauna from other wastewater treatment systems, these other systems were slow moving, impoundment-type systems that are not similar to the wastewater/wetlands system proposed by the City of Lynn Haven. The Lynn Haven system is designed for percolation and sheetflow, not ponding. Though there should be some expected changes, no evidence was provided that the receiving wetlands for the Lynn Haven facility would be affected to the extent there would be violations of any standard as set forth in Chapter 17-611, Florida Administrative Code. In essence, the legislature has determined that such experimentation with wetland areas is appropriate, albeit, even with the conservative limits of DER's rule, may prove to be a mistake. This facility is designed to fit within that rule and in fact is probably the best technology available for use in a wetland/wastewater situation. Finally, in order to avoid any potential impacts on the area which may over time become significant an approved monitoring program for surface water quality and affects on flora and fauna, as well as a groundwater monitoring program are required as conditions of the permit. The groundwater monitoring program has been designed to monitor any potential long term impacts to groundwater. With these protections there should not be any significant adverse impacts to surface or groundwater quality and the applicant is entitled to a construction permit for the AWT plant and distribution system. Lynn Haven's sewage would reach the proposed AWT plant through a transmission line. The transmission line would run from Lynn Haven's existing wastewater treatment plant across North Bay and through the unincorporated area of South Port. The Southport area is not sewered and utilizes individual septic tanks for its sewage. The transmission line would be constructed entirely in state road right-of-way. The line would terminate at the 640 acre site described above. A new, variable speed pumping station would be constructed adjacent to the old wastewater treatment plant. From this pump station, a 24 inch line would be constructed on City right-of-way up to the south shore of North Bay. At this point, the transmission line would be reduced in size to 20 inches and would be embedded approximately three feet below the Bay bottom. An additional variable speed pumping station would be located approximately half way along the 12 mile route of the transmission line to insure adequate pressure to pump wastewater to the new wastewater treatment plant. The pumps are to be employed to insure that the wastewater is continuously pumped uphill to the new site so that waste does not set, become septic, and create odor problems. The pumps are equipped to provide for chemical control of odor if necessary. Also, as a condition of the permit, the pumping stations are required to have backup power supplies should power be lost to the stations. The pumping stations and backup power supplies are to be tested monthly and the pumps are required to be continuously monitored by radio telemetry to insure they are operating properly. Additionally, the City of Lynn Haven will be required, as a condition of the permit, to visually inspect the entire length of the wastewater transmission line three times per day. The portion of the transmission line which would cross North Bay is approximately 3000 feet in length and would be constructed of high density polyethylene pipe (HDPE) with a wall thickness of one and one-half inches. HDPE pipe is used to transport materials such as hazardous wastes where leakage is not permissible. This type of pipe is virtually inert in that it is highly resistant to corrosion and other chemical reactions. It is also impact resistant and has a very high tensile strength. The pipe comes in 40 foot segments and is heat welded (fused) together. This type of joint significantly reduces the chance of any leakage. In fact, leakage around pipe joints is more likely to occur with other types of pipe and pipe connections. HDPE pipe is currently carrying wastewater across Watson Bayou in Bay County, Florida. 3/ There have been no reported problems with leaks or breaks occurring in the pipe crossing Watson Bayou. Given these facts, the probability of the proposed HDPE pipe leaking or breaking is extremely low, albeit not impossible, and such pipe appears to be the best material available for constructing a wastewater treatment transmission line across protected waters of the State. As a condition of the construction permit, the portion of the transmission line crossing North Bay will be required to have isolation valves at each end so that the pipe may be completely isolated in the event that it needs repair. The underwater portion of the line would be visually inspected by a diver twice per year and the line would be pressure tested before being placed into service. Additionally, pressure tests would be performed once a year. The construction permit also requires Lynn Haven to periodically inject dye into the proposed transmission line to check for any small leaks that may not otherwise be detected. Finally, the HDPE pipe would also be equipped so that television cameras could be inserted into the pipe to routinely inspect the interior of the pipe. In the event the HDPE portion of the transmission line would need to be repaired, the line could be immediately, temporarily repaired by a dresser coupling. A permanent repair could then be made in less than 24 hours once the material and equipment were staged at the site. The City intends to locally stockpile all necessary parts and equipment to effect any required repair to prevent any delay beyond four days. Permanent repairs would be accomplished by floating the line to the surface. The area needing repair would be cut out and a new section would be put in place by heat fusion. The line would then be pressure tested to insure the absence of leaks and placed back into service. During this process, the line would be taken out of service by the isolation valves and flow would be diverted to the eight million gallon holding ponds at the City of Lynn Haven's existing facility. These holding ponds can hold four days worth of wastewater from the City of Lynn Haven. Lynn Haven is required, as a condition of the construction permit, to have this reserve capacity as well as have a contractor on standby to make any repairs in the event such repairs are necessary. All of the technical specifications for the transmission system and the operating conditions imposed on it are designed to insure that the system does not fail or develop any leaks which could impact receiving waters, including North Bay. Given the permit conditions, the required inspections for leaks, the sound engineering design and quick repair methods proposed, the evidence demonstrated that the probability of any leak occurring in the portion of the transmission line crossing North Bay is extremely low and that if such a leak does occur any potential harm to the environment will likely be limited and quickly eliminated. The evidence demonstrated that the design of the transmission line and permit conditions provide reasonable assurances that the transmission line will meet or exceed the Department standards set forth in Chapter 17-604, Florida Administrative Code. Therefore, the applicant has provided reasonable assurances that the transmission line/collection system will not violate Department standards or rules and the applicant is entitled to a permit (permit #CS03-178910) for the proposed collection system. In addition to requiring a construction permit/collection system permit for the wastewater transmission line, the line will also require dredge and fill permits and a variance for crossing waters of the state. There are ten incidental crossings of state waters and one major crossing o f North Bay. Of the ten incidental crossings, two are over small creeks (Scurlock and Little Burnt Mill) These two incidental creek crossings will be accomplished by placing the transmission line (ductile iron pipe) on top of pilings placed in the water. Best management practices such as turbidity curtains and other erosion control practices are proposed and required by the permit to minimize construction impacts on water quality. The only impacts to wetland resources would be from the placement of the pilings. The evidence demonstrated that any impact would be minimal and not significant. The evidence did not demonstrate that the aerial crossings would have any long term water quality or environmental impacts. The remaining eight incidental crossings of waters of the state consist of small, seasonally wet ditches which would be traversed by trenching and burying the transmission line. Again, turbidity controls such as curtains and hay bales would be employed to protect water quality. The evidence did not demonstrate that any significant long term or short term impacts to resources of the state would occur. The evidence did demonstrate that the applicant has provided reasonable assurances that water quality standards would not be violated in regards to these 10 incidental water crossings. Likewise, the evidence demonstrated that the construction of these 10 incidental water crossings would not be contrary to the public interest. Therefore, the applicant is entitled to issuance of a dredge and fill permit (permit #031785181) for these 10 water crossing. However, a much harder question arises in relation to the dredge and fill permit and the variance required for the 3,000 foot segment of the wastewater transmission line which crosses North Bay. Pursuant to Rule 17- 312.080(7), Florida Administrative Code, permits for dredging and filling activity directly in Class II waters which are approved for shellfish harvesting by the Department of Natural Resources (DNR) shall not be issued. The reason for the rule is that any pollution caused by dredging and filling and, as in this case, the permanent placement of a sewage pipe in food producing waters could potentially have catastrophic effects on more than just the environment but on local employment in the shellfish industry and the quality of food available to the State. Put simply, the Department has determined by enacting its Rule that the public interest in food producing waters far outweighs any other consideration or criteria under Sections 403.918 and 403.919, Florida Statutes, in determining whether dredging and filling should take place in Class II, shellfish waters. In other words, it is not in the best interest of the public to allow dredging and filling so that a pipe carrying raw sewage can be placed in shellfishing waters. However, irrespective of this determination, the Department believes that, pursuant to Section 403.201(1)(c), Florida Statutes, it may grant a variance from its rules to relieve a hardship. As indicated earlier, North Bay is a Class II waterbody, conditionally approved for shellfishing. North Bay, therefore, falls within the Rule's prohibition against dredging and filling in Class II waters and the City is required to demonstrate the presence of a hardship in order to vary the Rule prohibition and obtain a dredge and fill permit for the North Bay crossing. On issues involving variances, the Department employs a two step analysis. The first part of the analysis is whether a hardship is present and the second is whether, if the variance were granted, would it result in permanent closure of Class II shellfish waters. The Department correctly recognizes that the question of whether a hardship exists is a question of fact and is determined on a case-by-case basis. Surprisingly, in a kind of "what we don't know can't hurt" posture the Department reviews a request for a variance standing alone based on the application as it is presented and does not require analyses of other possible alternatives to the granting of a variance. However, the existence of any alternatives, costs of any alternatives, timeliness of any alternatives, problems with any alternatives, whether an alternative represents a short term or long term solution to a given problem and the implementability of any of the alternatives are all factors utilized by the Department in determining whether or not to grant a variance. The Department's policy of non- review makes no sense, either factually or statutorily, when the Department is faced with varying a prohibition it created in its own rules. Similarly, the Department's policy of not requiring other alternatives to be examined before granting a variance goes against the fact that an applicant has the burden to establish entitlement to a permit and, in the case of a hardship variance, that a hardship exists because reasonable alternatives to granting a variance are not available. 4/ Likewise, the second part of the Department's hardship analysis relating to the permanent closure of shellfishing waters makes no sense given the fact that a non-permanent closure of shellfishing waters may have the same or just as serious effect on employment in the shellfishing industry, the loss of income due to an inability to earn a living in that industry and health risks posed by contaminated seafood. Temporary loss of income or a livelihood can, for all practical purposes, have consequences to the persons directly affected by a temporary closure of shellfishing waters similar in nature those caused by the permanent closure of shellfishing waters. The same can be said for health risks posed by a contaminated food supply. Rule 17-312.080(7), Florida Administrative Code, does not contain any exceptions for the temporary closure of shellfish waters. Nor is the rule limited to instances of permanent closure. Permanent closure is simpy not required in order to support a hardship under Section 403.201, Florida Statutes. Moreover, neither step in the Department's two-step analysis is included in any Rule promulgated by the Department. 5/ Without such a Rule, it is incumbent upon the Department or the applicant to demonstrate the underpinnings for this non-rule policy. No such evidence was presented at the hearing. In fact, the evidence presented at the hearing affirmatively demonstrated that the Department's non-rule policy violated both its own rules and the statute under which it is trying to proceed. As indicated, the issue of hardship is a question of fact and involves a weighing of all the facts and cicumstances involved in this project. In this case, there are shellfishing areas located close to the proposed location of the transmission line. North Bay is sometimes closed to shellfish harvesting by the Department of Natural Resources. These closures generally occur during wet weather conditions and are due to stormwater runoff and the failure of septic tanks in Southport. 6/ Additionally the current Lynn Haven system also contributes to the closure of North Bay. No competent, substantial evidence was provided that issuance of the permit and variance would result in the permanent closure of shellfish waters. The location of the proposed transmission line would be several hundred feet west of the Bailey Bridge embedded in the Bay floor. 7/ The proposed alignment of the transmission line through North Bay is in an area which is relatively biologically unproductive. The proposed placement of the transmission line avoids the few grassbeds that exist in the nearshore shallow areas except for approximately 200 square feet of grass. During construction of the line, these grasses would be removed immediately before the line is placed in a trench and then would be promptly replanted in the same area. The evidence demonstrated that the affected areas of grass should be able to reestablish itself. The evidence further demonstrated that there would not be any long term adverse impacts to these aquatic resources and there should not be any significant long term impacts on the balance of any aquatic life which may exist on the bay bottom. Water quality during construction will be protected by use of turbidity controls to control sediments. Therefore, any short term impacts on aquatic resources are likely to be insignificant. Concerns about long term adverse impacts to Class II waters are greatly reduced by the type of pipe and conditions in the permit which require that the transmission line be routinely inspected and tested to insure that there is no leakage and that in the unlikely event the line should need to be repaired, the line could be easily isolated and quickly repaired. The evidence showed that, to completely avoid Class II waters, the line could be moved several miles to the west or east of the line's proposed location or be placed over or under the Bay. If the line was moved west to the extent that it was in Class III waters, it would be over 40 miles long and would more than double the cost of the project. If the line was moved several miles to the east, it would go through the Deer Point Lake Watershed. The watershed is a Class I water supply for Bay County. Clearly, moving the line either west or east is not practical nor realistically feasible. Tunneling under North Bay would be very risky and is not technically feasible. The length of the tunnel would require steel pipe to be used. If tunneling could be done at all steel pipe would not provide the level of protection afforded by the HDPE pipe proposed by Lynn Haven. Placing the transmission line on pilings for an aerial route over North Bay is uneconomical and would create a potential hazard to navigation. Moreover, an aerial crossing would not solve any pollution problems should the transmission line leak or break and would also still involve a variance request since it would be necessary to dredge and fill in Class II waters for the placement of pilings or supports. Put simply, the evidence, showed that there was no realistic way to avoid Class II waters in North Bay given the location of the proposed wastewater treatment facility. A location which the City knew would require a hardship variance from the rule prohibition of dredging and filling in Class II, shellfishing waters. A hardship which the City created by site selection and which it hoped to overcome by strenuous permit conditions and futuristic speculative benefits to unsewered areas of the County. The existing treatment facility is operating in violation of both EPA and DER requirements, has been issued a notice of violation, is nonpermitted and is destined to be operating under a consent order. The system is hydraulically overloaded, handling approximately 1.2 million gallons per day while its rated capacity is 950,000 gallons per day. Refurbishing Lynn Haven's existing wastewater treatment facility would not be viable since the plant has outlived its useful life, is of a very poor design and probably could not be made to function within Departmental standards and water quality standards. The existing sprayfield does not function and results in overland flow of effluent which discharges to Class II waters. The high water table and presence of a semiconfining layer on the Lynn Haven peninsula virtually guarantee such discharges. Further, the plant only provides secondary treatment. Put simply, Lynn Haven needs another method of handling its sewage. The only remaining alternative to a Bay crossing is to tie into the existing Bay County system and any AWT wastewater treatment plant Bay County may build in the future. 8/ The existing Bay County system provides at most only secondary treatment. The Cherry Street facility, which is part of that system, functions essentially as a lift station rather than a treatment facility. The Military Point Lagoon portion of the system is nonpermitted and is operating under a consent order and has been the subject of enforcement action. The Department has an extensive agreement with Bay County requiring a significant and long term series of actions to deal with their wastewater treatment system. The modifications or improvements to the Bay County system to provide advanced treatment are not imminent and the final system conditions cannot now be determined as they will depend in large measure upon data and analysis remaining to be collected. Currently, the existing Bay County system processes a significant amount of industrial discharge and has a problem with phenols most likely due to industrial waste from two discreet industrial facilities in the County. 9/ However, all of Bay County's wastewater system problems are reasonably solvable and will be corrected in the near future, if they have not already been corrected. Additionally, the amount of sewage Lynn Haven would be sending into the current Bay County system probably would not significantly impact that system and its problems or the County's ability to solve those problems. The County is willing to accept Lynn Haven's sewage into its system and future AWT system. The connection into Bay County's system is a viable alternative currently in existence. Moreover, as indicated, Bay County has a long range plan to build an advanced wastewater treatment plant. As yet the plan remains "just a twinkle in the County's eye" and has not progressed to the design stage. However, this plan, of necessity, will eventually become reality in the next 5 to 10 years. The estimated cost to a Lynn Haven user for the Bay County conceptual system will be $25.00 per month in lieu of $15.00 for the proposed Lynn Haven system. These estimates are at best speculative. However, this cost estimate is not excessive given the fact that a Lynn Haven user lives in an environmentally sensitive area and a Bay County hook-up would eliminate the need to run a sewer pipe through food producing, Class II waters. 10/ Based on these facts, the evidence demonstrated that it was feasible for Lynn Haven to hook into Bay County's wastewater system without creating any more environmental impacts than that system is already experiencing and must solve and which, to a significant degree, have already been solved by Bay County. Given the existence of this alternative to crossing food producing waters and the fact that any future benefits are just as likely to be provided just as quickly by the County through AWT facilities, the applicant has failed to demonstrate the necessity for crossing North Bay and failed to demonstrate entitlement to a hardship variance for that crossing. Therefore, the applicant is not entitled to either a dredge and fill permit or variance for the proposed North Bay crossing.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is, recommended that the Florida Department of Environmental Regulation enter a final order issuing permit applications CS03178910, DC03178814, and 031785181, and denying the variance and permit number 031716641. RECOMMENDED this 27th day of November, 1991, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of November, 1991.

Florida Laws (5) 120.57120.68403.087403.088403.201
# 3
JACQUELINE M. LANE vs INTERNATIONAL PAPER COMPANY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 01-001490 (2001)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida Apr. 18, 2001 Number: 01-001490 Latest Update: Nov. 30, 2001

The Issue The first issue is whether Petitioner, Jacqueline M. Lane (Lane) has standing. The second issue is whether International Paper Company (IP) provided reasonable assurances it has the ability to meet the conditions of the existing industrial wastewater permit for the wastewater treatment facility at the paper mill in Cantonment, Florida, pursuant to Rule 62- 620.340(3), Florida Administrative Code. A final issue is whether Lane litigated this matter for an improper purpose.

Findings Of Fact Based on the evidence and testimony of the witnesses presented and the entire record in this proceeding, the following facts are found: The Parties The Department is charged with the responsibility for determining whether to approve the Application for transfer of permit number FL0002562-002-IWF/MT from Champion to IP. IP is a corporation authorized to do business in the State of Florida. IP operates a bleach kraft fine paper mill in Cantonment, Florida, formerly operated by Champion. Lane is a citizen of the State of Florida who lives on Perdido Bay. Application for Transfer of Industrial Wastewater Permit Number FL0002526-002-IWF/MT In June 2000, IP notified the Department it was acquiring Champion as a wholly owned subsidiary. IP took over operation of the facility in Cantonment on January 1, 2001. At that time, the companies had fully merged. On January 19, 2001, IP timely submitted an Application for Transfer of a Wastewater Facility or Activity Permit (Application) and advised the Department that "the permittee name for the pulp and paper mill in Cantonment, Florida[,] has been changed from 'Champion International Corporation, Inc.' to 'International Paper Company.'" Several wastewater permit- related documents were submitted to the Department as part of this name change. The Department processed IP's Application to transfer the facility's permit pursuant to Rule 62-620.340(3), Florida Administrative Code. "The parties agree that this matter is controlled by Rules 62-4.120 and 62-620.340, F.A.C., regarding the transfer of the permit. The parties [did not agree] upon what conditions of the combined permits are applicable to determine whether the Department has received 'reasonable assurances that the conditions of the permit will be met.' Rule 62-620.340(3), F.A.C." Rule 62-620.340(3), Florida Administrative Code, provides: "The Department shall allow the transfer under subsection (2) of this section unless it determines that the proposed permittee cannot provide reasonable assurance that conditions of the permit will be met. The determination shall be limited solely to the ability of the proposed permittee to comply with the conditions of the existing permit, and it shall not consider the adequacy of these permit conditions." (Emphasis added). This proceeding does not involve an enforcement action or consideration of whether the wastewater permit, and related documents, should be renewed. Champion's renewal application is under consideration by the Department. The parties agree that the documents described in Findings of Fact 10-19, infra, set forth the conditions of the permit number FL0002526-002-IWF/MT at this time. These documents are listed below: November 15, 1995, DEP Order (combining the NPDES permit and the State- issued wastewater permit) April 22, 1996, DEP Letter (clarifying November 15, 1995, Order regarding 1983 NPDES Permit) January 3,1983, EPA NPDES Permit December 13, 1989, DER Temporary Operating Permit December 1, 1989, DER Consent Order December 12, 1989, DER Variance The Permit(s), Consent Order, Variances, and Related Permit Documents Before May 1, 1995, in order to operate the wastewater treatment facility at the mill in Cantonment, both state and federal permits were required. The Department or its predecessor agency, the Department of Environmental Regulation (DER), issued state permits pursuant to Sections 403.08 and 403.088, Florida Statutes, and applicable rules. The United States Environmental Protection Agency (EPA) issued federal National Pollutant Discharge Elimination System (NPDES) permits pursuant to 40 Code of Federal Regulation Section 124.15. As a result of EPA's delegation of its NPDES authority to the Department in 1995, only one permit is now required. The 1995 Memorandum of Agreement between EPA and the Department does not allow the Department to modify a permit that has been administratively continued. Modifications to permit limits have to be made through the permit renewal process. On or about January 3, 1983, the EPA issued a NPDES permit to St. Regis Paper Company, authorizing discharge from the facility, located at the paper mill in Cantonment to the receiving waters named Eleven Mile Creek (creek). This NPDES permit contains the federal permit conditions applicable at this time. (EPA has since used the facility as a benchmark model to develop effluent guidelines for its new cluster rule.) On December 1, 1989, the DER entered into a Consent Order with Champion International Corporation. This Consent Order was issued as a result of Recommended and Final Orders issued in Perdido Bay Environmental Association, Inc. et al. v. Champion International Corporation and Florida Department of Environmental Regulation, 12 F.A.L.R. 126 (DER Nov. 14, 1989). This Consent Order allowed the continued operation of the facility. As a compliance requirement, a study report was required to include "an evaluation of technologies and treatment alternatives . . . to determine the most environmentally sound and practicable means to correct identified water quality violations caused by Champion." The studies required by the Consent Order are needed to pinpoint sources of pollutants in the creek and Perdido Bay (bay). The Consent Order has no expiration date although it is tied to the temporary operating permit (TOP) which had an expiration date of December 1, 1994. Extensive studies have been submitted to the Department pursuant to paragraph 14.A. of the Consent Order, which are necessary to trigger "the final compliance plan." This has been an ongoing process since the Consent Order and TOP were issued. The conditions in the Consent Order and TOP apply at this time. Various discharge limitations and monitoring requirements are set forth in the TOP. On December 13, 1989, DER issued a TOP, Number IT17- 156163, to the facility, which was issued in conjunction with the Consent Order. The TOP expressly relies on the Consent Order for authorization. It contains the effective state permit conditions at this time. On December 8, 1989, DER issued a Variance from water quality standards for color (transparency), iron, zinc, and the general water quality criterion for specific conductance. The standards in the Variance are part of the TOP and are effective at this time. The mill no longer needs the Variance for iron and zinc. As to those parameters, it currently operates at lower levels than under the Variance. On November 15, 1995, the Department combined the state and federal operating permits into a single permit identified as Wastewater Permit Number FL0002526-002-IWF/MT. The TOP and NPDES permit were administratively continued when renewal applications were filed. The Department will transfer to IP the permit documents described in Finding of Fact 9, supra. The Department will also transfer the pending permit renewal applications filed by Champion. Wastewater Treatment Facility at the Paper Mill in Cantonment, Florida In the past, Champion owned and operated a 1400-ton per day bleach and kraft pulp and paper mill in Cantonment. The operation is now conducted by IP. The paper mill treats its effluent from industrial activities at an on-site wastewater treatment facility (facility). Stormwater that falls on the industrial portion of the mill is also processed through the facility. The mill is required to and takes monthly samples from the creek for a few parameters, e.g., DO and pH, to provide data to the Department for use in developing possible changes to effluent limitations in a final compliance plan. There is an installed structure that continuously measures the flow of the effluent at the end of the facility's treatment system. This point, i.e., where the flow is measured, is called the Parshall Flume which is the compliance point for the facility. The effluent at Parshall Flume is automatically sampled each day, analyzed, and reported on a monthly basis to the Department. The analyses are reviewed and compared to the effluent limitations for a particular permit. The treated effluent is discharged from the Parshall Flume through a pipe to natural wetlands. In this wetland area, the treated effluent combines with several streams, non- processed stormwater, and runoff from land south and west of the facility. Runoff from residential areas and areas west of the mill, including the City of Cantonment, also flows into this area. The IP mill is not the only source of discharge into this area. After passing through the natural wetlands, the treated effluent runs through a pipe that discharges into the creek from below the surface. This point is about a half-mile from the facility. It is called the "boil" because the water from the pipe boils up into the creek. The "boil" is not a compliance point. On occasion, a Department inspector has taken water samples at the boil. Each time, his sampling has shown water quality standards were met at the boil. At the boil, the water flowing into the creek from the pipe contains treated effluent and drainage from areas not associated with the mill. From the boil, the creek flows a distance of fourteen miles to Perdido Bay (the bay). At the boil, there is also stormwater runoff and drainage from residential areas flowing into the creek in addition to the water from the pipe. Along the sides of the creek to the bay is a large drainage basin, which includes agricultural and residential runoff that flows into the creek. The boil, which is non-processed stormwater of the creek, could be contaminated from non-IP sources. Sources of pollutants in the bay include residential and agricultural stormwater runoff, Perdido River, and the creek. The Escambia County Utility Authority (ECUA) also has a treatment plant that has a discharge into the bay. Saltwater intrusion and runoff from development are additional sources of pollutants in the bay. Lane takes samples at the boil and most recently in May and June of 2001. Her measurement of dissolved oxygen (DO) was approximately 2.6 and for specific conductance, between 1600 and 2000. Lane also samples the water at a bridge (279A) two miles down the creek from the boil. Lane testified regarding bacteriological quality at the boil or further down stream, that fecal coliforms, including the bacteria Klebsiella, were present. Lane is not a certified sampler. She does not have the required quality control/quality assurance program. Lane does not know the Department requirements to sample dissolved oxygen. She could not describe an approved standard for such sampling. Surface Water Quality Standards Unless otherwise provided through relief mechanisms, discharges into surface waters must meet the minimum water quality standards set forth in Rules 62-302, Florida Administrative Code. Relief mechanisms include variances, consent orders, and temporary operating permits. The Department has issued variances, consent orders, and temporary operating permits to allow permit holders time to respond to changes in water quality standards and related regulations that reflect changes in understanding of environmental impacts to water bodies. Permit Conditions The permit conditions do not require compliance with all the water quality criteria in Chapter 62-302, Florida Administrative Code, for water quality parameters. The Department has not yet agreed on "final treatment solutions" it can require under the Consent Order. See, e.g., Finding of Fact 49. Specific deviations from the surface water quality standards in Chapter 62-302, Florida Administrative Code, are authorized by the Consent Order, TOP, variance, and NPDES permit. The specific effluent discharge limitations in the TOP and NPDES permit, are for BOD5, TSS, iron, specific conductance, pH, and zinc. (The reference to condition 12 in paragraph 25 of the TOP has not been amended.) Several of the effluent limitations (e.g., specific conductance) were granted by the Variance. Paragraph 26 of the TOP specifies the monitoring and frequency requirements for the monitoring at the Parshall Flume. This monitoring information can be used by the Department to pinpoint sources of pollutants in the creek and in order to establish numerical, water-quality based effluent limitations for those sources. General Condition 5 of the TOP does not per se impose on the mill the duty to meet all water quality standards in Chapter 62-302, Florida Administrative Code. The TOP authorizes "a certain amount of pollution" and "certain relief." The TOP further established a "compliance schedule" for Champion to study the impacts of the discharge. However, the Department rules allow for reopening of the TOP and changing the permit conditions to reflect new evidence causing a concern regarding pollution. Here, the Department has not reopened the TOP. The permit, including the TOP and Consent Order, allows the mill a period of time to come into compliance with all minimum water quality standards. When a final permit is eventually issued, the facility will have to meet these standards absent some express relief mechanism at that time. IP Provided Reasonable Assurances of Its Ability to Meet Permit Conditions The Department employee who reviewed IP's Application to transfer the permit is an expert in environmental engineering. At the time he reviewed the Application, he was familiar with the existing permit conditions. As part of his review, he ascertained whether IP was satisfying the conditions of the permit and determined it was. The Department reviewed IP's annual report and other corporate brochures as part of its processing of the transfer Application. Information in these documents revealed IP has obtained other Federal-type NPDES permits for other companies at several other facilities. The Department was familiar with IP's local management at the Cantonment facility when it processed the transfer Application. IP brings considerable "capability and talent" to the mill. The Department performed inspections during the last six (6) months and was familiar with the facility and wastewater system. IP is an international company with greater financial resources than Champion. It has approximately $30 billion in annual sales. Champion, in comparison, generated about $5 billion a year. It is clear that that the operation of the mill and the facility would have less capital and financial support without IP. Since June 2000, IP has worked with the Department in a continuation of the Department's concept of relocating the facility's discharge to wetlands. The plan considers removal of the facility's treated effluent from the creek to wetlands on IP's land and effectively eliminates it as a point source discharge and removes the discharge from the creek. IP will have a greater ability than Champion to meet permit conditions due to greater financial sources, technical staff, and resources. IP's management is committed to resolving water quality issues like specific conductance and is willing to resolve outstanding water quality issues in the bay and creek. In the view of the former Northwest District Director who worked on water quality issues at the facility for twelve years ending March 31, 2001, the current plan to discharge to wetlands will be implemented and allow compliance with all water quality standards. He also opines that IP has the ability to comply with water quality standards under the plan to discharge to wetlands. In the Department's view, IP has provided reasonable assurances that it has the ability to meet the existing conditions of the permit sought to be transferred. IP Complies with Permit Conditions as Evidence of Ability According to the Department's expert, Mr. William A. Evans, a professional engineer with a Master's degree in civil engineering and an expert in environmental engineering, there have been no verifiable violations of permit conditions and no exceedances since January 2000, before IP took over operations of the mill. On the other hand, Mr. Evans, in reviewing a discharge monitoring report for IP for April 2001, advised, during cross-examination, that there appeared to be "an apparent violation, exceedance of the permit" for specific conductance pursuant to the 1500 micromhons per centimeter limit in the EPA's version of the permit. However, the Variance, which is part of the Application, was granted "because there is no practicable means known or available for the adequate control of the pollution involved," i.e., specific conductance. The Department applies the limit of 2500 micromhos per centimeter set forth in the Variance for specific conductance, which is a reasonable interpretation of the permit documents. When the permit documents, including the Variance are read in this light, IP is in compliance with this limit. IP is in compliance with the Consent Order, NPDES permit, and Variance. In making this finding, the undersigned is mindful of Lane's arguments and facts presented. The issue here is not black or white; violation or no violation. As noted by Mr. Evans: This permit is recognized since '89 is [sic] not meeting water quality standards. It has all these documents because it doesn't. And they're still working under those. And the Department agrees with Ms. Lane that they are not meeting water quality standards in the creek. And we're working under these documents to make improvements. And so is Champion and so is IP. But they are not, in our opinion, violating the conditions of the permit. There [sic] are complying with studying it, meeting the interim limits that are set forth in the permit. And that is what the Statutes require when a facility can not meet all the standards of a permit. The Department, while considering the renewal application, has not approved it yet because they have not received reasonable assurances that new permit conditions can be met. Champion, and now IP, are facing the continuing challenge of satisfying, among other requirements, water quality standards, which takes time, money, and know-how. The Department rightly believes that IP can best meet this challenge. The Department's review of the monthly monitoring reports submitted by the mill since Champion was purchased reveals the facility has complied with permit conditions. The most recent monthly report was submitted May 23, 2001, and includes data through April 2001. During inspections at the facility since June 2000, the Department found no violations of permit conditions. The mill, under IP's operation, has not exceeded the fecal coliform conditions of its permit. The mill has no significant contribution to fecal coliform in the creek because it treats its own domestic sewage and meets the fecal coliform limit at the compliance point. Runoff along the creek from agricultural and domestic sources could contribute to fecal and total coliform in the creek. The Department enforces the "more stringent" pH condition in the 1989 TOP and Variance which is controlling over the less stringent standard in the 1983 NPDES permit. The pH limit in the NPDES permit is 6.0-9.0. The Department reasonably interprets the freshwater stream pH rule to mean enforcement is not required if the permittee meets the range in the rule (6.0-8.5), more stringent than the 9.0 limit in the NPDES permit. The facility's pH data satisfies this range. If the Department were to enforce a limit of 6.5, instead of 8.5, IP has the ability to meet the lower limit by installing one of several available technologies to control the pH levels. IP's current proposal includes one of these technologies. The biological integrity provision in the Consent Order requires studies on biological components of the creek and pH impacts this condition. Permit Conditions Affecting the Creek and Bay The permit does not require the facility to meet all the minimum surface water quality standards of Chapter 62-302, Florida Administrative Code, in the creek and bay. That is because of the relief mechanisms in the Consent Order, TOP, NPDES permit, and Variance. The Consent Order provides a time frame for the facility to come into compliance with water quality standards in the creek and bay. In terms of the Consent Order, the Department considers IP to be at the paragraph 14.A. step of the compliance schedule since the Department has not yet "resolved or agreed on the final corrective action required under this [C]onsent [O]rder." The Department considers the facility to be in compliance with permit conditions because it is "working under a complying [sic] schedule and an order or a temporary operating permit." See Finding of Fact 49. As long as IP is meeting the "interim limits that are set forth in the permit," it is not violating conditions of the permit. The Department is aware of water quality exceedances from the standards in the creek and bay caused by the mill. This data was reported in the "fifth year surveys." This information serves as a basis for making improvements and finding "a new solution for the effluent as required by the consent order." See Finding of Fact 49. Proposal for Joint Project with ECUA IP and the ECUA are working with the Department on a plan than would result in the discharge of IP's treated effluent to wetlands, thereby removing the effluent from the creek. IP's financial capability, size, and technical human resources make this plan feasible. IP will propose a plan to satisfy the Consent Order which consists of three parts: upgrading IP's industrial wastewater treatment facility; allowing ECUA to locate an advanced domestic wastewater treatment plant on its land; and disposing the treated effluent from both facilities to wetlands on IP's land through a pipeline. The proposed plan to discharge the facility's treated effluent to wetlands is a suitable solution that will allow the mill to meet minimum water quality standards. Lane has no objection to the plan to discharge to wetlands. It will resolve all her water quality issues. She believes the plan, similar to a prior plan, is "feasible." Standing and Improper Purpose Lane admits the Department is not making any changes to existing permit conditions before transferring it to IP. Lane agrees that changing the name on the permit from Champion to IP has no adverse affect on her. Lane brought this proceeding because she is dissatisfied with the manner in which the Department is enforcing conditions in the facility's permit. According to Lane, "They haven't done their duty." Her main complaints are with the Department's failure to enforce the permit conditions and the lack of a permit that makes the permit holder comply with Florida law. Lane feels that Champion violated permit conditions in the past, and IP is currently violating permit conditions and, as a result, the permit should not be transferred because a decision to transfer is an implicit finding of compliance. In this light, Lane argues that past performance can be an indication of future ability or lack thereof. Lane acknowledges that in order to add conditions to the existing permit, the Department must provide notice to the mill and give it a chance to meet the proposed conditions. She further admits the Department has not provided such notice. Lane proved that the environmental situation attending Champion's, and now IP's, operation of the mill and the wastewater facility has been and is less than optimum and in need of positive changes. The Department agrees and so does IP. Lane's personal observations of the condition of the creek and bay are documented. However, Lane did not prove that she will suffer an "injury in fact" if the permit and related documents are transferred to IP. Lane is not otherwise substantially affected by the Department's decision to approve the transfer. Lane's evidence did not rebut IP and the Department's proof that IP has the ability to comply with the permit conditions. The preponderance of the evidence shows that the environment in and around the mill and the facility has a better opportunity for improvement if IP takes control of the mill and facility. On the other hand, based on this record, Lane did not bring this case for an improper purpose.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that a final order be rendered as follows: Lane lacks standing to challenge the transfer of industrial wastewater permit number FL0002526-002-IWF/MT to IP because Lane did not prove that her substantial interests were being determined by the Department's transfer of the permit from Champion to IP; IP provided reasonable assurances it has the ability to comply with the conditions of industrial wastewater permit number FL0002526-002-IWF/MT; IP has complied with the conditions of industrial wastewater permit number FL0002526-002-IWF/MT, as the Department construes those conditions, since assuming control of the mill on January 1, 2001; and Lane did not participate in this administrative proceeding for an improper purpose. DONE AND ENTERED this 24th day of August, 2001, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of August, 2001. COPIES FURNISHED: Jacqueline M. Lane 10738 Lillian Highway Pensacola, Florida 32506 Terry Cole, Esquire Patricia A. Renovitch, Esquire Oertel, Hoffman, Fernandez & Cole, P.A. Post Office Box 1110 301 S. Bronough Street, Fifth Floor Tallahassee, Florida 32302-1110 Craig D. Varn, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy C. Carter, Agency Clerk Office of General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Teri L. Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 David B. Struhs, Secretary Department of Environmental Protection 3900 Commonwealth Boulevard The Douglas Building Tallahassee, Florida 32399-3000

Florida Laws (6) 120.569120.57120.595403.061403.088403.0885 Florida Administrative Code (3) 62-302.53062-4.12062-620.340
# 4
FRIENDS OF PERDIDO BA, INC. AND JAMES LANE vs INTERNATIONAL PAPER COMPANY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 08-003923 (2008)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida Aug. 12, 2008 Number: 08-003923 Latest Update: Mar. 12, 2010

The Issue The issues in this case are whether International Paper Company (IP) is entitled to National Pollutant Discharge Elimination System (NPDES) Permit No. FL0002526 issued by Department of Environmental Protection (Department) and whether the Department should approve Consent Order No. 08-0358, for the operation of IP’s paper mill in Cantonment, Escambia County, Florida.

Findings Of Fact The Department is the state agency authorized under Chapter 403, Florida Statutes (2008), to regulate discharges of industrial wastewater to waters of the state. Under a delegation from the United States Environmental Protection Agency, the Department administers the NPDES permitting program in Florida. IP owns and operates the integrated bleached kraft paper mill in Cantonment. FOPB is a non-profit Alabama corporation established in 1988 whose members are interested in protecting the water quality and natural resources of Perdido Bay. FOPB has approximately 450 members. About 90 percent of the members own property adjacent to Perdido Bay. James Lane is the president of FOPB. Jacqueline Lane and James Lane live on property adjacent to Perdido Bay. The mill's wastewater effluent is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. Perdido Bay is approximately 28 square miles in area. U.S. Highway 90 crosses the Bay, going east and west, and forms the boundary between what is often referred to as the "Upper Bay" and "Lower Bay." The Bay is relatively shallow, especially in the Upper Bay, ranging in depth between five and ten feet. At the north end of Perdido Bay is a large tract of land owned by IP, known as the Rainwater Tract. The northern part of the tract is primarily fresh water wetlands. The southern part is a tidally-affected marsh. The natural features and hydrology of the fresh water wetlands have been substantially altered by agriculture, silviculture, clearing, ditching, and draining. Tee Lake and Wicker Lake are small lakes (approximately 50 acres in total surface area) within the tidal marsh of the Rainwater Tract. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to the lakes from Perdido Bay. Florida Pulp and Paper Company first began operating the Cantonment paper mill in 1941. St. Regis Paper Company acquired the mill in 1946. In 1984, Champion International Corporation (Champion) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such as printing and writing grades of paper. The mill is integrated, meaning that it brings in logs and wood chips, makes pulp, and produces paper. The wood is chemically treated in cookers called digesters to separate the cellulose from the lignin in the wood because only the cellulose is used to make paper. Then the "brown stock" from the digesters goes through the oxygen delignification process, is mixed with water, and is pumped to paper machines that make the paper products. In 1989, the Department and Champion signed a Consent Order to address water quality violations in Elevenmile Creek. Pursuant to the Consent Order, Champion commissioned a comprehensive study of the Perdido Bay system that was undertaken by a team of scientists led by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed by a series of related scientific studies (“the Livingston studies"). Champion was granted variances from the water quality standards in Elevenmile Creek for iron, specific conductance, zinc, biological integrity, un-ionized ammonia, and dissolved oxygen (DO). In 2001, IP and Champion merged and Champion’s industrial wastewater permit and related authorizations were transferred to IP. In 2002, IP submitted a permit application to upgrade its wastewater treatment plant (WWTP) and relocate its discharge. The WWTP upgrades consist of converting to a modified activated sludge treatment process, increasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (mgd). IP proposes to convey the treated effluent by pipeline 10.7 miles to the Rainwater Tract, where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and upper Perdido Bay. IP's primary objective in upgrading the WWTP was to reduce the nitrogen and phosphorus in the mill's effluent discharge. The upgrades are designed to reduce un-ionized ammonia, total soluble nitrogen, and phosphorus. They are also expected to achieve a reduction of biological oxygen demand (BOD) and TSS. IP plans to obtain up to 5 mgd of treated municipal wastewater from a new treatment facility planned by the Emerald Coast Utility Authority (ECUA), which would be used in the paper production process and would reduce the need for groundwater withdrawals by IP for this purpose. The treated wastewater would enter the WWTP, along with other process wastewater and become part of the effluent conveyed through the pipeline to the wetland tract. The effluent limits required by the proposed permit include technology-based effluent limits (TBELs) that apply to the entire pulp and paper industry. TBELs are predominantly production-based, limiting the amount of pollutants that may be discharged for each ton of product that is produced. The proposed permit also imposes water quality-based effluent limits (WQBELs) that are specific to the Cantonment mill and the waters affected by its effluent discharge. The WQBELs for the mill are necessary for certain constituents of the mill's effluent because the TBELs, alone, would not be sufficient to prevent water quality criteria in the receiving waters from being violated. The Livingston studies represent perhaps the most complete scientific evaluation ever made of a coastal ecosystem. Dr. Livingston developed an extensive biological and chemical history of Perdido Bay and then evaluated the nutrient loadings from Elevenmile Creek over a 12-year period to correlate mill loadings with the biological health of the Bay. The Livingston studies confirmed that when nutrient loadings from the mill were high, they caused toxic algae blooms and reduced biological productivity in Perdido Bay. Some of the adverse effects attributable to the mill effluent were most acute in the area of the Bay near the Lanes' home on the northeastern shore of the Bay because the flow from the Perdido River tends to push the flow from Elevenmile Creek toward the northeastern shore. Because Dr. Livingston determined that the nutrient loadings from the mill that occurred in 1988 and 1989 did not adversely impact the food web of Perdido Bay, he recommended effluent limits for ammonia nitrogen, orthophosphate, and total phosphorous that were correlated with mill loadings of these nutrients in those years. The Department used Dr. Livingston’s data, and did its own analyses, to establish WQBELs for orthophosphate for drought conditions and for nitrate-nitrite. WQBELs were ultimately developed for total ammonia, orthophosphate, nitrate-nitrite, total phosphorus, BOD, color, and soluble inorganic nitrogen. The WQBELs in the proposed permit were developed to assure compliance with water quality standards under conditions of pollutant loadings at the daily limit (based on a monthly average) during low flow in the receiving waters. Petitioners did not dispute that the proposed WWTP is capable of achieving the TBELs and WQBELs. Their main complaint is that the WQBELs are not adequate to protect the receiving waters. A wetland pilot project was constructed in 1990 at the Cantonment mill into which effluent from the mill has been discharged. The flora and fauna of the pilot wetland project have been monitored to evaluate how they are affected by IP’s effluent. An effluent distribution system is proposed for the wetland tract to spread the effluent out over the full width of the wetlands. This would be accomplished by a system of berms running perpendicular to the flow of water through the wetlands, and gates and other structures in and along the berms to gather and redistribute the flow as it moves in a southerly direction toward Perdido Bay. The design incorporates four existing tram roads that were constructed on the wetland tract to serve the past and present silvicultural activities there. The tram roads, with modifications, would serve as the berms in the wetland distribution system. As the effluent is discharged from the pipeline, it would be re-aerated and distributed across Berm 1 through a series of adjustable, gated openings. Mixing with naturally occurring waters, the effluent would move by gravity to the next lower berm. The water will re-collect behind each of the vegetated berms and be distributed again through each berm. The distance between the berms varies from a quarter to a half mile. Approximately 70 percent of the effluent discharged into the wetland would flow a distance of approximately 2.3 miles to Perdido Bay. The remaining 30 percent of the effluent would flow a somewhat shorter distance to lower Elevenmile Creek. A computer simulation performed by Dr. Wade Nutter indicated that the effluent would move through the wetland tract at a velocity of approximately a quarter-of-a-foot per second and the depth of flow across the wetland tract will be 0.6 inches. It would take four or five days for the effluent to reach lower Elevenmile Creek and Perdido Bay. As the treated effluent flows through the wetland tract, there will be some removal of nutrients by plants and soil. Nitrogen and phosphorous are expected to be reduced approximately ten percent. BOD in the effluent is expected to be reduced approximately 90 percent. Construction activities associated with the effluent pipeline, berm, and control structures in the wetland tract, as originally proposed, were permitted by the Department through issuance of a Wetland Resource Permit to IP. The United States Army Corps of Engineers has also permitted this work. Petitioners did not challenge those permits. A wetland monitoring program is required by the proposed permit. The stated purpose of the monitoring program is to assure that there are no significant adverse impacts to the wetland tract, including Tee and Wicker Lakes. After the discharge to the wetland tract commences, the proposed permit requires IP to submit wetland monitoring reports annually to the Department. A monitoring program was also developed by Dr. Livingston and other IP consultants to monitor the impacts of the proposed discharge on Elevenmile Creek and Perdido Bay. It was made a part of the proposed permit. The proposed Consent Order establishes a schedule for the construction activities associated with the proposed WWTP upgrades and the effluent pipeline and for incremental relocation of the mill's discharge from Elevenmile Creek to the wetland tract. IP is given two years to complete construction activities and begin operation of the new facilities. At the end of the construction phase, least 25 percent of the effluent is to be diverted to the wetland tract. The volume of effluent diverted to the wetlands is to be increased another 25 percent every three months thereafter. Three years after issuance of the permit, 100 percent of the effluent would be discharged into the wetland tract and there would no longer be a discharge into Elevenmile Creek. The proposed Consent Order establishes interim effluent limits that would apply immediately upon the effective date of the Consent Order and continue during the two-year construction phase when the mill would continue to discharge into Elevenmile Creek. Other interim effluent limits would apply during the 12- month period following construction when the upgraded WWTP would be operating and the effluent would be incrementally diverted from Elevenmile Creek to the wetland tract. A third set of interim effluent limits would apply when 100 percent of the effluent is discharged into the wetland tract. IP is required by the Consent Order to submit quarterly reports of its progress toward compliance with the required corrective actions and deadlines. Project Changes After the issuance of the Final Order in 05-1609, IP modified its manufacturing process to eliminate the production of white paper. IP now produces brown paper for packaging material and “fluff” pulp used in such products as filters and diapers. IP’s new manufacturing processes uses substantially smaller amounts of bleach and other chemicals that must be treated and discharged. IP reduced its discharge of BOD components, salts that increase the specific conductance of the effluent, adsorbable organic halides, and ammonia. IP also reduced the odor associated with its discharge. In the findings that follow, the portion of the Rainwater Tract into which IP proposes to discharge and distribute its effluent will be referred to as the “effluent distribution system,” which is the term used by Dr. Nutter in his 2008 “White Paper” (IP Exhibit 23). The effluent distribution system includes the berms and other water control structures as well as all of the natural areas over which IP’s effluent will flow to Perdido Bay. Most of the existing ditches, sloughs, and depressions in the effluent distribution system are ephemeral, holding water only after heavy rainfall or during the wet season. Even the more frequently wetted features, other than Tee and Wicker Lakes, intermittently dry out. There is currently little connectivity among the small water bodies that would allow fish and other organisms to move across the site. Fish and other organisms within these water bodies are exposed to wide fluctuations in specific conductivity, pH, and DO. When the water bodies dry out, the minnows and other small fish die. New populations of fish enter these water bodies from Elevenmile Creek during high water conditions, or on the feet of water birds. IP's consultants conducted an extensive investigation and evaluation of animal and plant communities in the Rainwater Tract in coordination with scientists from the Department and the Florida Fish and Wildlife Conservation Commission. Among the habitats that were identified and mapped were some wet prairies, which are designated “S-2," or imperiled, in the Florida Natural Area Inventory. In these wet prairies are rare and endangered pitcher plants. IP modified the design of the proposed effluent distribution system to shorten the upper berms and remove 72.3 acres of S-2 habitat. The total area of the system was reduced from 1,484 acres to 1,381 acres. The proposed land management activities within the effluent distribution system are intended to achieve restoration of historic ecosystems, including the establishment and maintenance of tree species appropriate to the various water depths in the system, and the removal of exotic and invasive plant species. A functional assessment of the existing and projected habitats in the effluent distribution system was performed. The Department concluded that IP’s project would result in a six percent increase in overall wetland functional value within the system. That estimate accounts for the loss of some S-2 habitat, but does not include the benefits associated with IP’s conservation of S-2 habitat and other land forms outside of the effluent distribution system. IP proposes to place in protected conservation status 147 acres of wet prairie, 115 acres of seepage slope, and 72 acres of sand hill lands outside the effluent distribution system. The total area outside of the wetland distribution system that the Consent Order requires IP to perpetually protect and manage as conservation area is 1,188 acres. The Consent Order was modified to incorporate many of the wetland monitoring provisions that had previously been a part of the former experimental use of wetlands authorization. IP proposes to achieve compliance with all proposed water quality standards and permit limits by the end of the schedule established in the Consent Order, including the water quality standards for specific conductance, pH, turbidity, and DO, which IP had previously sought exceptions for pursuant to Florida Administrative Code Rule 62-660.300(1). Limitation of Factual Issues As explained in the Conclusions of Law, the doctrine of collateral estoppel bars the parties in these consolidated cases from re-litigating factual issues that were previously litigated by them in DOAH Case No. 05-1609. The Department’s Final Order of August 8, 2007, determined that IP had provided reasonable assurance that the NPDES permit, Consent Order, exception for the experimental use of wetlands, and variance were in compliance with all applicable statutes and rules, except for the following area: the evidence presented by IP was insufficient to demonstrate that IP’s wastewater effluent would not cause significant adverse impact to the biological community of the wetland tract, including Tee and Wicker Lakes. Following a number of motions and extensive argument on the subject of what factual issues raised by Petitioners are proper for litigation in this new proceeding, an Order was issued on June 2, 2009, that limited the case to two general factual issues: Whether the revised Consent Order and proposed permit are valid with respect to the effects of the proposed discharge on the wetland system, including Tee and Wicker Lakes, and with respect to any modifications to the effluent distribution and treatment functions of the wetland system following the Final Order issued in DOAH Case No. 05- 1609; and Whether the December 2007 report of the Livingston team demonstrates that the WQBELS are inadequate to prevent water quality violations in Perdido Bay. Petitioners’ Disputes Petitioners’ proposed recommended orders include arguments that are barred by collateral estoppel. For example, Jacqueline Lane restates her opinions about physical and chemical processes that would occur if IP’s effluent is discharged into the wetlands, despite the fact that some of these opinions were rejected in DOAH Case No. 05-1609. Dr. Lane believes that IP’s effluent would cause adverse impacts from high water temperatures resulting from color in IP’s effluent. There is already color in the waters of the effluent distribution system under background conditions. The increased amount of shading from the trees that IP is planting in the effluent distribution system would tend to lower water temperatures. Peak summer water temperatures would probably be lowered by the effluent. Petitioners evidence was insufficient to show that the organisms that comprise the biological community of the effluent distribution system cannot tolerate the expected range of temperatures. Dr. Lane also contends that the BOD in IP's effluent would deplete DO in the wetlands and Tee and Wicker Lakes. Her contention, however, is not based on new data about the effluent or changes in the design of the effluent distribution system. There is a natural, wide fluctuation in DO in the wetlands of the effluent distribution system because DO is affected by numerous factors, including temperature, salinity, atmospheric pressure, turbulence, and surface water aeration. There are seasonal changes in DO levels, with higher levels in colder temperatures. There is also a daily cycle of DO, with higher levels occurring during the day and lower levels at night. It is typical for DO levels in wetlands to fall below the Class III water quality standard for DO, which is five milligrams per liter (mg/l). An anaerobic zone in the water column is beneficial for wetland functions. DO levels in the water bodies of the effluent distribution system currently range from a high of 11 to 12 mg/l to a low approaching zero. The principal factor that determines DO concentrations within a wetland is sediment oxygen demand (SOD). SOD refers to the depletion of oxygen from biological responses (respiration) as well as oxidation-reduction reactions within the sediment. The naturally occurring BOD in a wetland is large because of the amount of organic material. The BOD associated with IP’s effluent would be a tiny fraction of the naturally occurring BOD in the effluent distribution system and would be masked by the effect of the SOD. It was estimated that the BOD associated with IP's effluent would represent only about .00000000001 percent of the background BOD, and would have an immeasurable effect. Dr. Pruitt’s testimony about oxygen dynamics in a wetland showed that IP’s effluent should not cause a measurable decrease in DO levels within the effluent distribution system, including Tee and Wicker Lakes. FOPB and James Lane assert that only 200 acres of the effluent distribution system would be inundated by IP’s effluent, so that the alleged assimilation or buffering of the chemical constituents of the effluent would not occur. That assertion misconstrues the record evidence. About 200 acres of the effluent distribution system would be permanently inundated behind the four berms. However, IP proposes to use the entire 1,381-acre system for effluent distribution. The modifications to the berms and the 72-acre reduction in the size of the effluent distribution system would not have a material effect on the assimilative capacity of system. The residence time and travel time of the effluent in the system, for example, would not be materially affected. Variability in topography within the effluent distribution system and in rainfall would affect water depths in the system. The variability in topography, including the creation of some deeper pools, would contribute to plant and animal diversity and overall biological productivity within the system. The pH of the effluent is not expected to change the pH in the effluent distribution system because of natural buffering in the soils. The specific conductance (saltiness) of IP’s effluent is not high enough to adversely affect the biological community in the fresh water wetlands of the effluent distribution system. IP is already close to maintaining compliance with the water quality standard for specific conductance and would be in full compliance by the end of the compliance schedule established in the proposed Consent Order. After the 2007 conversion to brown paper manufacturing, IP’s effluent has shown no toxicity. The effluent has passed the chronic toxicity test, which analyzes the potential for toxicity from the whole effluent, including any toxicity arising from additive or synergistic effects, on sensitive test organisms. Dr. Lane points out that the limits for BOD and TSS in the proposed NPDES permit exceed the limits established by Department rule for discharges of municipal wastewater into wetlands. However, paper mill BOD is more recalcitrant in the environment than municipal wastewater BOD and less “bio- available” in the processes that can lower DO. In addition, the regulatory limits for municipal wastewater are technology-based, representing “secondary treatment.” The secondary treatment technology is not applicable to IP’s wastewater. Sampling in the pilot wetland at the paper mill revealed a diversity of macroinvertebrates, including predator species, and other aquatic organisms. Macroinvertebrates are a good measure of the health of a water body because of their fundamental role in the food web and because they are generally sensitive to pollutants. Petitioners contend that the pilot wetland at the paper mill is not a good model for the effect of the IP’s effluent in the wetland distribution system, primarily because of the small amount of effluent that has been applied to the pilot wetland. Although the utility of the pilot wetland data is diminished in this respect, it is not eliminated. The health of the biological community in the pilot wetland contributes to IP’s demonstration of reasonable assurance that the biological community in the effluent distribution system would not be adversely affected. The effluent would not have a significant effect on the salinity of Tee and Wicker Lakes. Under current conditions, the lakes have a salinity of less than one part per thousand 25 percent of the time, less than 10 parts per thousand 53 percent of the time, and greater than 10 parts per thousand 22 percent of the time. In comparison, marine waters have a salinity of 2.7 parts per thousand. IP’s effluent would not affect the lower end of the salinity range for Tee and Wicker Lakes, and would cause only a minor decrease in the higher range. That minor decrease should not adversely affect the biota in Tee and Wicker Lakes or interfere with their nursery functions. The proposed hydrologic loading rate of the effluent amounts to an average of six-tenths of an inch over the area of effluent distribution system. The addition of IP’s effluent to the wetlands of the effluent distribution system and the creation of permanent pools would allow for permanent fish populations and would increase the opportunity for fish and other organisms to move across the effluent distribution system. Biological diversity and productivity is likely to be increased in the effluent distribution system. By improving fish habitat, the site would attract wading birds and other predatory birds. Although the site would not be open to public use (with the exception of Tee and Wicker Lakes), recreational opportunities could be provided by special permission for guided tours, educational programs, and university research. Even if public access were confined to Tee and Wicker Lakes, that would not be a reduction in public use as compared to the existing situation. IP’s discharge, including its discharges subject to the interim limits established in the Consent Order, would not interfere with the designated uses of the Class III receiving waters, which are the propagation and maintenance of a healthy, well-balanced population of fish and wildlife. The wetlands of the effluent distribution system are the “receiving waters” for IP’s discharge. The proposed project would not be unreasonably destructive to the receiving waters, which would involve a substantial alteration in community structure and function, including the loss of sensitive taxa and their replacement with pollution-tolerant taxa. The proposed WQBELs would maintain the productivity in Tee and Wicker Lakes. There would be no loss of the habitat values or nursery functions of the lakes which are important to recreational and commercial fish species. IP has no reasonable, alternative means of disposing of its wastewater other than by discharging it into waters of the state. IP has demonstrated a need to meet interim limits for a period of time necessary to complete the construction of its alternative waste disposal system. The interim limits and schedule for coming into full compliance with all water quality standards, established in the proposed Consent Order, are reasonable. The proposed project is important and beneficial to the public health, safety, and welfare because (1) economic benefits would accrue to the local and regional economy from the operation of IP’s paper mill, (2) Elevenmile Creek would be set on a course of recovery, (3) the wetlands of the effluent distribution system would become a site of greater biological diversity and productivity, (4) the environmental health of Perdido Bay would be improved, (5) the Department’s decades-long enforcement action against IP would be concluded, (6) substantial areas of important habitat would be set aside for permanent protection, and (7) the effluent distribution system would yield important information on a multitude of scientific topics that were debated by these parties. The proposed project would not adversely affect the conservation of fish or wildlife or their habitats. The proposed project would not adversely affect fishing or water-based recreational values or marine productivity in the vicinity of the proposed discharge. There is no Surface Water Improvement and Management Plan applicable to IP’s proposed discharge. The preponderance of the record evidence establishes reasonable assurance that IP’s proposed project would comply with all applicable laws and that the Consent Order establishes reasonable terms and conditions to resolve the Department’s enforcement action against IP for past violations.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is: RECOMMENDED that the Department enter a final order granting NPDES Permit No. FL0002526 and approving Consent Order No. 08-0358. DONE AND ENTERED this 27th day of January, 2010, in Tallahassee, Leon County, Florida. BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of January, 2010.

Florida Laws (3) 373.414403.067403.088 Florida Administrative Code (6) 62-302.30062-302.70062-302.80062-4.07062-4.24262-660.300
# 5
THOMAS E. FORTSON; DON M. LOOP; SAMUEL D. ROWLEY, M.D.; RONALD L. RISH, M.D.; GERALD R. AGRESTI; DAVID B. LEE; SCOTT D. RITCHIE; NANCY K. LONGHARDT; DAMON C. LOOP; AND DALE B PURCELL vs KINGSLEY SERVICE COMPANY AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-003087 (1991)
Division of Administrative Hearings, Florida Filed:Orange Park, Florida May 16, 1991 Number: 91-003087 Latest Update: Apr. 28, 1992

The Issue The issue is whether the Respondent, Kingsley Service Company, should be granted an operating permit to increase the capacity of its Fleming Oaks Waste Water Treatment Plant from .490 MGD to .720 MGD.

Findings Of Fact The Fleming Oaks Waste Water Treatment facility is located on Fleming Island, at the south end of Bahia Road. (T 25). It includes three units, a .180 MGD, a .150 MGD and a .490 MGD plant. (T 49). The facility is owned and operated by Kingsley Service Company, the largest utility in Clay County. (T 24) Kingsley has operated in Clay County for more than 26 years and presently services the equivalent of over 17,000 homes. (T 23). Fleming Island is a relatively large piece of land bounded on the east by the St. Johns River, on the south by Black Creek, and on the north by Doctors Lake. On the west, Black Creek and Doctors Lake are connected by Swimming Pen Creek and a swampy marsh area. (T 25-26). In 1982, a .080 MGD sewage treatment plant was built at the present Fleming Oaks location. In 1984, a .0150 MGD plant was added, bringing the total facility capacity to .230 MGD. Effluent from those plants was discharged through a pipe to the St. Johns River. On February 25, 1986, Kingsley received permit No. D010-115962 authorizing continued operation at the Fleming Oaks facility of the 0.080 MGD and 0.150 MGD sewage treatment plants. This operation permit expired on February 25, 1991. (RE #1). On October 8, 1987, the Department issued permit No. DC10-139744 to Kingsley to expand "the existing 0.230 MGD...Sewage treatment plant by constructing a separate 0.490 MGD extended aeration sewage treatment plant with a total design capacity of 0.720 MGD." (RE #2). On January 25, 1990, the Department issued permit No. D01-104228 to Kingsley, "[t]o operate a 0.490 MGD extended aeration sewage treatment plant." This permit required Kingsley to apply for an operation permit for the full capacity of the plant, 0.720 MGD, when the new plant, 0.490 MGD reaches a load of approximately 90% of its capacity. The operation permit for the .490 MGD expires on January 25, 1995. (RE #3). Pursuant to the permit requirement referenced in the preceding paragraph, Kingsley applied to the Department on January 17, 1991 for an operation permit to "[p]lace [the] existing 0.230 MGD WWTP into service raising treatment capacity to 0.720." (RE #5). After reviewing that application, the Department executed a notice of permit issuance, authorizing Kingsley to operate a parallel 0.490 MGD extended aeration waste water treatment plant ("WWTP"), a 0.150 MGD contact stabilization WWTP and a 0.080 MGD contact stabilization WWTP having a combined design capacity of 0.720 MGD serving Fleming Island and authorizing discharge of the treated effluent into the St. Johns River, via an existing 500-foot pipe, 8 inches in diameter. (RE #7). This permit allowed the previously-constructed 0.230 MGD plant to be placed back in service. It is this permit which the Petitioners challenge. The system in question was designed by a qualified engineering firm with substantial experience in the design of waste water treatment plants (R 46, 47 & 48) and in compliance with Department regulations. (R 63-64). The system, as designed and constructed, is being operated by qualified personnel and consistent with Department regulations. (R 280, R 124, 131, 132). The 0.490 MGD plant consists of an aeration tank, a digester, and a clarifier. (RE #8; T 51). Raw sewage is pumped from lift stations into a "surge tank," where it falls through a bar screen and grid chamber which take out large items and sand which accumulate in the sewage system. (T 55-56). Raw sewage is then pumped from the surge tank to the aeration portion of the plant. (T 56). In the aeration tank, solids and liquids, called "mixed liquor," are evenly distributed throughout the depth of the liquid in the aeration tank, where the breakdown process occurs. (T 65). A control box is located between the aeration tank and clarifier which allows waste water from the aeration tank to flow into the clarifier once it reaches a certain level in the aeration tank. (T 56-57). The flow moves through the control box and into the portion of the clarifier called an "annular weir." The annular weir is approximately 18 inches from the outside wall of the clarifier and looks like the outer ring of a bull's-eye target from above. The purpose of the annular weir is to distribute flow evenly into the clarifier. At the center of the circular clarifier is a rectangular-shaped structure called an "effluent weir." (T 57). In the part of the clarifier outside the rectangular effluent weir, undigested solid material settles out onto the bottom. The liquid portion which remains after the solids settle out flow over the top of the effluent weir into the interior of the rectangular structure. The interior of the effluent weir can only be reached from the top. There are no entry points at the bottom, where the solids are. (T 66). The clear liquid that flows over the effluent weir and the sludge that settles to the bottom of the clarifier undergo further, separate treatments. The clarified effluent that flows over the top of the effluent weir is piped to the chlorine contact chamber for disinfection. (T 52). Chlorine is fed into the effluent to destroy pathogens which may be present. (T 81). The final 2-1/2 feet of the chlorine contact chamber is where dechlorination takes place. (T 62). Dechlorination is required so that the chlorine level in the effluent is reduced. (T 54). Dechlorination occurs when sulfur dioxide is mixed with the chlorinated effluent. Discharge monitoring takes place in the chlorine contact chamber. (T 62). The treated and dechlorinated effluent is pumped to the St. Johns River through an outfall which is 500 feet from shore. (T 53, 63). The sludge which settled to the bottom of the clarifier is drawn off at the bottom of the clarifier and directed into the "digester" where, under aerobic conditions and without additional food, bacteria die-off occurs. (T 59). The sludge is actually a liquid substance, approximately 97% water and 3% solids. (T 98-99). The digester is an ancillary process separate from the treatment of waste water. (T 57). The digester stabilizes and further reduces the organic content of the sludge. (T 51). Tanker trucks regularly remove the sludge from the digester and transport it to dairy farms where it is applied to the land. (T 98-101; RE #11 for invoices). The 0.490 MGD plant "has been designed and constructed to meet all the requirements currently posted or regulated by the State of Florida." (T 64). The construction and operation of the Fleming Oaks plant, when compared with the other 600 in the Department's Northeast District, is "very good." (T 131). Although the BOD and TSS limits are 20, the Fleming Oaks plant consistently gets better than 10 and many times less than 5 for these parameters. (T 131). Sampling of the St. Johns River at the end of the outfall pipe has shown that the water quality standards have been met for each sample. (T 141). The Monthly Operating Reports show that required parameters are almost always met. (RE #11). On June 7th, a machine sampled sewage coming into the plant and sewage that was leaving the plant. Two samples were taken, one where raw sewage comes in and one the final effluent. The raw sewage had a BOD of 205 and the treated effluent had a BOD of 1. (T 283-286). TSS was run the same way. Raw sewage had a TSS of 182 while the treated sewage had a TSS of 1. (T 287). Petitioners' concerns about the permitting of the 0.230 MGD capacity center around the buildup of "muck" in the river in the vicinity of the existing outfall. Petitioners assert that Kingsley pumped sludge through the outfall which "polluted" their waterfront as "muck." Donald Loop, who lives 4,000-5,000 feet to the south of the outfall, described the muck buildup as starting 18 months ago "at two to three inches and over a period of time increas[ing] to 18 inches in some places and other places over 24 inches." In conjunction with the muck buildup was "extreme devastation of all greenery, starting with cattails and many other green plants that grew out there." (T 153-154). During this time frame, the rainfall was 25% below the annual average and "the river flows were much less than normal." (T 153, 270). Damon Loop, Donald Loop's brother, lives on a canal, 350-400 feet off the St. Johns River. The canal is approximately 1,000 feet north of the outfall of the Fleming Oaks facility. (T 233). He noticed a muck buildup "when Kingsley Service Company first started putting the effluent into the river." (T 228). At that time, the end of the canal area started filling up with muck. The muck now covers almost 4-1/2 feet and has been there for six or seven years. (T 228). Two or three hundred feet out in the St. Johns River, where it is 10 feet deep, there is a black silt one foot to 15 inches deep. (T 229). Other witnesses also described the muck. Saxton Weir, who lives approximately one-half mile to the north of the outfall, described the muck as being 43 or 44 inches thick. (T 200, 204). The muck extended along his shoreline "over 500 feet" and extended out into the water "from 5 feet to over 100 feet." (T 212-213). Mr. Weir actually saw muck extending as far out as "485 feet from the shoreline." (T 214). The accumulated muck was blown away after three days of rain and a storm. (T 205). A video tape of the conditions caused by the muck was received and viewed. There are tons and tons of muck in this area. Petitioners believe that the muck was actually sludge or TSS illegally discharged from the Fleming Oaks facility. This belief was based upon the mistaken conclusion that the 0.430 MGD treatment process was requiring an inappropriately large amount of chlorine. Petitioners concluded that there was excessive chlorine in the water because of the death of barnacles on pilings in the area. Chlorine kills bacteria and oxidizes other organic materials. (T 116). Small amounts of organic matter which have not been completely digested by the treatment process can be oxidized by chlorine. (T 102). Chlorine is increased to treat unoxidized organic material. (T 83). The MOP/11 operation waste water manual, characterized by Mr. Loop as the "Bible of waste water treatment," indicates that about three parts per million chlorine is appropriate. (T 176). For June of 1990, the average chlorine feed was actually 3.3 parts per million. (T 297-298). The chlorine levels were within normal limits. The barnacles were killed by some other factor, perhaps the drought which occurred at about this time. Because of the muck-related complaints, a sample of sludge was taken by a Department employee from an unknown location in the area and analyzed at the Department laboratory, where it was microscopically determined that the sample was decaying vegetation. (T 138). Without intentionally discharging large amounts of sludge over a period of time, the chance of even noticing any buildup along the shoreline is very, very small. The particles left in the effluent are very small and very light. The ability of this material to settle in a water flowing at even low velocity is difficult. The velocity of the current at the outfall is sufficient to prevent any particles from settling out. (T 96). The "muck" in the river in front of the houses of the Petitioners was not shown to be sludge from the Fleming Oaks Waste Water Treatment Plant after testing by the Petitioners. (R 252). The capacity at issue in this proceeding, 0.230 MGD capacity, consists of 0.080 MGD plant, composed of two tanks, and a 0.150 MGD plant that is composed of three tanks. (T 49-50). Both of these plants are contact stabilization plants. ( T 67). Although permitted until February of 1991, these two plants ceased operating in April of 1989. (T 37). The St. Johns River is Class III waters of the State of Florida. Secondary treatment, which is required for these plants, is sufficient to maintain the water quality standards for the St. Johns River. (T 124-125, 130). When the 0.080 and 0.150 MGD plants were operational, they operated within the limits of the permit at issue here. (T 67). They will meet the requirements for issuance of the permit. (T 124). When the .230 MGD capacity is brought on line, raw sewage entering the surge tank will be routed to each of the three plants rather than just to the aeration plant alone, as it is at present. (T 88). Waste water will be pumped proportionately to the separate plants through variable speed pumps. (T 89). After appropriate treatment in the 0.80 MGD and 0.150 contact stabilization plants, clear liquid effluent will be transferred from them to the chlorine contact chamber where it will be chlorinated, dechlorinated and then pumped to the St. Johns River through the existing outfall. (T 90).

Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence of record, the candor and demeanor of witnesses, and the pleadings and arguments of the parties, it is RECOMMENDED that the application of the Kingsley Service Company for the waste water treatment operating permit at issue be granted, on the terms and conditions set forth in the Department's Draft Permit, in evidence as Respondents' Exhibit 7. DONE and ENTERED this 13th day of March, 1992, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13th day of March, 1992.

Florida Laws (1) 120.57
# 6
DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES vs LARRY G. DELUCENAY, D/B/A MAD HATTER UTILITIES, INC., 91-007141 (1991)
Division of Administrative Hearings, Florida Filed:New Port Richey, Florida Nov. 05, 1991 Number: 91-007141 Latest Update: May 10, 1993

Findings Of Fact Petitioner, Department of Health and Rehabilitative Services, is the state agency charged with regulating waste water treatment facilities and any sanitary nuisance which may emanate as a result of such operations pursuant to Chapters 381 and 386, Florida Statutes. Respondent, Larry G. Delucenay d/b/a Madhatter Utilities, Inc., owns and operates the Foxwood Waste Water Treatment Plant which is permitted and certified by the Department of Environmental Regulation. Respondent, in operating the Foxwood system, discharges its treated effluent water by means of two percolation ponds and a drip field located adjacent to the Cypress Cove Subdivision in Pasco County, Florida. Respondent owns and controls percolation ponds which are located adjacent to the Cypress Cove Subdivision and pumps human waste from a sewage treatment plant to percolation ponds in the Cypress Cove Subdivision. Respondent's percolation ponds are located approximately 50 ft. west of several residences and the ponds are accessible to the public. The ponds are elevated from 3 ft. to 5 ft. above the adjacent residential lots in the subdivision. However, there is a sand berm approximately 8 ft. high with a 12 yd. base which serves as a barrier between the percolation ponds and the Cypress Cove residences. On August 5, 1991, environmental health specialist Burke observed liquid flowing through the sand berm. He also observed erosion patterns in the sand on the berm which indicated liquid was flowing through it. Mr. Burke, while in the company of two other employees of Petitioner, observed liquid flowing from the percolation ponds onto Lake Floyd Drive to the south of the ponds. An improperly designed nearby lake exacerbated the flooding into Lake Floyd Drive. Respondent's waste water treatment system is designed according to the manufacturer's specifications. Pasco County allowed a number of developments to be built in the area without an adequate drainage system which adversely impacts Respondent's system to the point whereby untreated drainage outfall is draining into the southeast areas in Cypress Cove. Specifically, Respondent's pond #4 is designed to handle a water level up to 67.33 ft. During the investigation of the case, the water level in that pond was approximately 3 1/2 ft. higher than the designed capacity and was therefore causing overflow into the southeast areas of the development. (Respondent's Exhibits A, B and C.) Noteworthy also was the fact that a developer failed to complete a connection which has impacted Respondent's percolation pond and has forced the water to rise approximately 9 ft. higher than the designed capacity which has resulted in an overflow approximately 3 ft. to 4 ft. into the neighboring subdivision. As a result of the overflow, waste water spills over the percolation ponds and prevents the water from draining through the berms as designed. Petitioner's consulting engineer, Robert William Griffiths, credibly testified that a number of agencies having oversight responsibility such as Pasco County, the Southwest Florida Water Management District and the Department of Environmental Regulation, mandated that the drainage system be completed prior to the entire build-up of Cypress Cove. Despite the mandate, the drainage system was not completed and the County allowed the development to continue. Respondent is properly treating and chlorinating sewage in its plant which complies with Petitioner's requirements for the treatment of sewage in systems designed such as Respondent's. Respondent properly treats sewage flowing through its ponds and its berms are properly maintained. As early as October 1989, Respondent consulted and retained an engineer, Gerald E. Towson, who was commissioned to investigate the specifics of designing a waste water treatment plant based on concerns raised by the Department of Environmental Regulation (DER). As a result of that charge, Towson investigated the area and observed flooding and the stormwater runoff in the Cypress Cove neighborhood and attempted to find a solution to alleviate the problem. Consultant Towson also investigated Respondent's treatment plant to determine if the system was functioning as designed. Based on his observation and inspection of the treatment facility, the facility was operating as it was designed and properly filters and treats the effluent. However, based on Respondent's inability to control the stormwater runoff in the neighborhood created by the excess buildup, Towson concluded that there was no workable solution to the problem. As a result of Towson's inability to find a workable solution to handle the concerns raised by DER, Respondent suggested that Towson locate another wastewater treatment site which he found in a surrounding area. Respondent negotiated a lease arrangement with the landowner and initiated the permit process with DER. After the completion of numerous documents and engineering studies required by the Department of Environmental Regulation, Respondent was able to get the leased site permitted by DER as a slow drip irrigation system during March 1991. However, while construction of the system was scheduled to start during March 1991, as a result of vigorous protests from area neighbors, construction was delayed. Respondent thereafter investigated several sites but was unable to fine a suitable area near Cypress Cove. Towson completed a lengthy and cumbersome process in getting Respondent's construction application processed by DER. Initially the application was filed and following a DER review, a Notice of Intent to Issue was given. Hillsborough County thereafter reviewed the project and following their review, Hillsborough County issued its Notice of Intent to Grant and public notice was given. Based on Respondent's inability to comply with the neighbor's concerns regarding setback problems, DER withdrew its permit during May of 1991. Thereafter, Petitioner became involved in connecting with the Pasco County Public System. That connection was ultimately made and the County gave its approval following a delay based on a review occasioned by an employee who had been on vacation. Upon getting the approval, Petitioner ordered the equipment from a supplier which included installation of a magnetic meter and the necessary hookups into the Pasco County System. A "phased in" connection has been completed and the stormwater runoff problem has been abated. When the problems raised by DER and ultimately Petitioner was first brought to Respondent's attention, Pasco County did not have the capacity to handle the hookups required by Respondent's system. Respondent, has been involved in the installation of waste water treatment plants since 1967. Respondent is qualified as a Class "A" Licensee Waste Water Operator. He has been accepted as an expert in numerous administrative hearings. Respondent purchased the Foxwood System during 1982. Respondent utilized a 13 acre tract near Lake Floyd Drive. The system was licensed and designed with a flow capacity of 300,000 plus gallons per day. During the time when the Administrative Complaint was issued, the flow capacity was 220,000 gallons per day. The storm water system which was to have been completed by developers in the area was not connected to the public system and the County granted numerous other permits to daycare centers and several parking lots were constructed for other newly constructed commercial buildings in the area. As a result of the excess runoff created by the development in the area, Respondent's system was impacted and the water level was raised in the percolation ponds to the point whereby an overflow resulted. Petitioner adduced no evidence which showed that any physical or emotional harm resulted from the runoff. At all times while the concerns were being raised by Petitioner and other oversite agencies, the effluents in Respondent's systems were properly treated. Respondent vigorously attempted to abate the runoff created by the excess buildup in the area despite the fact that the problem was raised by Pasco County and over which Respondent had no control. Throughout the process of attempting to find alternate solutions and ultimately getting permitting approval to start construction of an alternative waste water treatment system, Respondent operated in good faith. When no alternate site became available, Respondent initially made application to connect with Pasco County System and that connection has now been made.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that: Petitioner enter a Final Order dismissing the Administrative Complaint herein in its entirety. DONE and ENTERED this 29 day of April, 1992, in Tallahassee, Leon County, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29 day of April, 1992. COPIES FURNISHED: THOMAS W CAUFMAN ESQ HRS DISTRICT V LEGAL OFFICE 11351 ULMERTON RD - STE 407 LARGO FL 34648 RANDALL C GRANTHAM ESQ COTTERILL GONZALEZ & GRANTHAM 1519 N MABRY - STE 100 LUTZ FL 33549 RICHARD S POWER AGENCY CLERK DEPT OF HEALTH AND REHABILITATIVE SERVICES 1323 WINEWOOD BLVD TALLAHASSEE FL 32399 0700 JOHN SLYE ESQ/GENERAL COUNSEL DEPT OF HEALTH AND REHABILITATIVE SERVICES 1323 WINEWOOD BLVD TALLAHASSEE FL 32399 0700

Florida Laws (2) 120.57386.03
# 7
LANIGER ENTERPRISES OF AMERICA, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 05-001599 (2005)
Division of Administrative Hearings, Florida Filed:Stuart, Florida May 04, 2005 Number: 05-001599 Latest Update: Feb. 22, 2007

The Issue The issue in this case is whether Respondent Laniger Enterprises of America, Inc. (Laniger), is entitled to the renewal of its domestic wastewater facility permit that was denied by Petitioner Department of Environmental Protection (Department).

Findings Of Fact The Parties The Department is the administrative agency of the State of Florida having the power and duty to protect Florida's air and water resources and to administer and enforce the provisions of Chapter 403, Florida Statutes (2005),1 and the rules promulgated in Florida Administrative Code Title 62. Laniger is a Florida corporation that owns and operates the WWTP that is the subject of this case, located at 1662 Northeast Dixie Highway, Jensen Beach, Martin County, Florida. The WWTP is referred to in the Department permit documents as the Beacon 21 WWTP. The WWTP Laniger acquired the WWTP in 1988 in a foreclosure action. At that time, the WWTP was in a "dilapidated" condition and was operating under a consent order with the Department. After acquiring the WWTP, Laniger brought it into compliance with the Department's requirements. Laniger's WWTP is commonly referred to as a "package plant."2 The WWTP's treatment processes are extended aeration, chlorination, and effluent disposal to percolation ponds. The WWTP does not have a direct discharge to surface water. It was permitted to treat 99,000 gallons per day (gpd) of wastewater. Its average daily flow during the past year was about 56,000 gallons. The east side of the WWTP site is adjacent to Warner Creek. On the north side of the WWTP site, an earthen berm separates the WWTP's percolation ponds from a drainage ditch that connects to Warner Creek. Warner Creek is a tributary to the St. Lucie River. The St. Lucie River is part of the Indian River Lagoon System. The Indian River Lagoon Act In 1989, the St. Johns River Water Management District and the South Florida Water Management District jointly produced a Surface Water Improvement and Management (SWIM) Plan for the Indian River Lagoon System ("the lagoon system"). For the purpose of the planning effort, the lagoon system was defined as composed of Mosquito Lagoon, Indian River Lagoon, and Banana River Lagoon. It extends from Ponce de Leon Inlet in Volusia County to Jupiter Inlet in Palm Beach County, a distance of 155 miles. The SWIM Plan identified high levels of nutrients as a major problem affecting water quality in the lagoon system. Domestic wastewater was identified as the major source of the nutrients. The SWIM Plan designated 12 problem areas within the lagoon system and targeted these areas for "research, restoration and conservation projects under the SWIM programs." Department Exhibit 2 at 11-13. Neither Warner Creek nor the area of the St. Lucie River that Warner Creeks flows into is within any of the 12 problem areas identified in the SWIM Plan. With regard to package plants, the SWIM Plan stated: There are numerous, privately operated, "package" domestic WWTPs which discharge indirectly or directly to the lagoon. These facilities are a continual threat to water quality because of intermittent treatment process failure, seepage to the lagoon from effluent containment areas, or overflow to the lagoon during storm events. Additionally, because of the large number of "package" plants and the lack of enforcement staff, these facilities are not inspected or monitored as regularly as they should be. Where possible, such plants should be phased out and replaced with centralized sewage collection and treatment facilities. Department Exhibit 2 at 64. In 1990, the Legislature passed the Indian River Lagoon Act, Chapter 90-262, Laws of Florida. Section 1 of the Act defined the Indian River Lagoon System as including the same water bodies as described in the SWIM Plan, and their tributaries. Section 4 of the Act provided: Before July 1, 1991, the Department of Environmental Regulation shall identify areas served by package sewage treatment plants which are considered a threat to the water quality of the Indian River Lagoon System. In response to this legislative directive, the Department issued a report in July 1991, entitled "Indian River Lagoon System: Water Quality Threats from Package Wastewater Treatment Plants." The 1991 report found 322 package plants operating within the lagoon system and identified 155 plants as threats to water quality. The 1991 report described the criteria the Department used to determine which package plants were threats: Facilities that have direct discharges to the system were considered threats. Facilities with percolation ponds, absorption fields, or other sub-surface disposal; systems located within 100 feet of the shoreline or within 100 feet of any canal or drainage ditch that discharges or may discharge to the lagoon system during wet periods were considered threats. * * * Facilities with percolation ponds, absorption fields, or other sub-surface disposal systems located more than 100 feet from surface water bodies in the system were evaluated case-by-case based on [operating history, inspection reports, level of treatment, and facility reliability]. Laniger's package plant was listed in the 1991 report as a threat to the water quality of the lagoon system because it was within 100 feet of Warner Creek and the drainage ditch that connects to Warner Creek. Laniger's WWTP was not determined to be a threat based on its wastewater treatment performance. There was no evidence presented that Laniger's WWTP had ever had intermittent treatment process failure, seepage to the lagoon system from effluent containment areas, or overflow during storm events. Those were the concerns related to package plants that were described in the SWIM Plan and the Department's 1991 report. Laniger's WWTP was not determined to be a threat based on evidence that it was causing or contributing to excess nutrients in Warner Creek or in that part of the St. Lucie River nearest to Laniger's WWTP. No evidence was presented that there are excess nutrients in Warner Creek or in that part of the St. Lucie River nearest to Laniger's WWTP. The Department's 1991 report concluded that the solution for package plants threats was to eliminate the package plants and connect their wastewater flow to centralized sewage collection and treatment facilities. To date, over 90 of the 155 package plants identified in the Department's 1991 report as threats to the water quality of the lagoon system have been connected to centralized sewage collection and treatment systems. The 1999 Permit and Administrative Order On August 26, 1999, the Department issued Domestic Wastewater Facility Permit No. FLA013879 to Laniger for the operation of its WWTP. Attached to and incorporated into Laniger's 1999 permit was Administrative Order No. AO 99-008- DW43SED. The administrative order indicates it was issued pursuant to Section 403.088(2)(f), Florida Statutes. That statute pertains to discharges that "will not meet permit conditions or applicable statutes and rules" and requires that the permit for such a discharge be accompanied by an order establishing a schedule for achieving compliance. The administrative order contains a finding that the Beacon 21 WWTP is a threat to the water quality of the lagoon system and that the WWTP "has not provided reasonable assurance . . . that operation of the facility will not cause pollution in contravention of chapter 403, F.S., and Chapter 62-610.850 of the Florida Administrative Code." The cited rule provides that "land application projects shall not cause or contribute to violations of water quality standards in surface waters." The administrative order required Laniger to connect its WWTP to a centralized wastewater collection and treatment [facility] "within 150 days of its availability . . . or provide reasonable assurance in accordance with Chapter 620.320(1) of the Florida Administrative Code that continued operation of the wastewater facility is not a threat to the water quality of the Indian River Lagoon System." As a result of an unrelated enforcement action taken by the Department against Martin County, and in lieu of a monetary penalty, Martin County agreed to extend a force main from its centralized sewage collection and treatment facility so that the Laniger WWTP could be connected. The extension of the force main was completed in April 2003. On April 10, 2003, the Department notified Laniger by letter that a centralized wastewater collection and treatment system "is now available for the connection of Beacon 21." In the notification letter, the Department reminded Laniger of the requirement of the administrative order to connect within 150 days of availability. On May 9, 2003, Laniger's attorney responded, stating that the administrative order allowed Laniger, as an alternative to connecting to the centralized wastewater collection and treatment system, to provide reasonable assurance that the WWTP was not a threat to the water quality of the lagoon system, and Laniger had provided such reasonable assurance. Laniger's attorney also stated, "due to the location of Martin County's wastewater facilities, such facilities are not available as that term is defined in the [administrative] order." On September 29, 2003, the Department issued a warning letter to Laniger for failure to connect to the Martin County force main and for not providing reasonable assurance that the WWTP will not cause pollution in contravention of Chapter 403, Florida Statutes. The Department took no further formal action until it issued the NOV in August 2005. Laniger's challenge of the NOV was consolidated with this permit case. The Permit Renewal Application In an "enforcement meeting" between Laniger and the Department prior to the expiration of 1999 permit, the Department told Laniger that it would not renew Laniger's WWTP permit. Later, when Laniger filed its permit renewal application, the Department offered to send the application back so Laniger would not "waste" the filing fee, because the Department knew it was not going to approve the application. Laniger submitted its permit renewal application to the Department on February 15, 2005. The Department considered Laniger's permit application to be complete, but proceeded to prepare the Notice of Denial without any technical review of the application. The Department denied the application on April 6, 2005. The Department's Notice of Permit Denial stated that the permit was denied because Laniger had not connected to the available centralized wastewater collection and treatment system nor provided reasonable assurance that the WWTP "is not impacting water quality within the Indian River Lagoon System." The record evidence showed that the "reasonable assurance" that would have been necessary to satisfy the Department was more than the reasonable assurance the Department usually requires for package plants, and more than the Department would have required if Laniger's WWTP was 100 feet from Warner Creek. Competent substantial evidence was presented that Laniger's WWTP is capable of being operated in accordance with the statutes and rules of Department generally applicable to package wastewater treatment plants. Laniger's 1999 permit expired on August 25, 2004. Laniger has operated the plant continuously since the permit expired. Whether the Martin County Facility is Available As discussed below in the Conclusions of Law, it is concluded that the Department did not have authority to require Laniger to connect the WWTP to the Martin County force main or to require assurance beyond the reasonable assurance generally required for package treatment plants in order to obtain a permit. However, because considerable evidence and argument was directed to whether the force main was available, that issue will be addressed here. The Martin County force main was not extended to the boundary of the Laniger WWTP site. The force main terminates approximately 150 feet north of the Laniger WWTP site and is separated from the WWTP site by a railroad and railroad right-of-way. Laniger presented undisputed evidence that the cost to connect to the Martin County force main would be approximately $490,000 and that cost was prohibitively high, given the relatively small number of households served by the WWTP. The Laniger WWTP is subject to rate regulation by the Public Service Commission (PSC). Laniger presented evidence suggesting that connection to the Martin County force main would result in rates that would not be approved by the PSC. The evidence was speculative and not competent to support a finding regarding PSC action. The evidence does show, however, that PSC rate regulation was not a factor that the Department considered when it determined that the Martin County force main was available. There is no Department rule that defines when a centralized sewage collection and treatment facility is "available." The determination that the Martin County force main was available to Laniger was made informally by members of the Department's compliance staff in the Department's St. Lucie office. Mr. Thiel testified that he considered the force main to be available because it was "in close proximity" to Laniger's WWTP. However, Mr. Thiel admitted that there is a difference of opinion within DEP as to when a facility is available and reasonable persons could disagree about whether a facility was available. Mr. Thiel thought that the cost to connect is a factor to be considered in determining whether a facility is available, but another Department employee did not think cost should be considered. There was no evidence that the Department took into account Laniger's cost to connect in determining that the Martin County force main was available. The Department simply assumed that the Martin County force main was close enough to the Laniger WWTP site that the cost to Laniger would not be prohibitive. In addition, the Department was aware of other package plants that had connected to centralized sewage collection and treatment facilities that were the same distance or a greater from the package plant, and the Department did not hear from the owners of the package plants that the costs were prohibitive. Timothy Powell of the Department stated that force mains are usually made available by extending the force main so that it is "abutting the property as much as possible." He also stated that he assumed that Martin County would extend its force main under the railroad and to the boundary of the Laniger WWTP site after Laniger agreed to connect. However, there was no evidence to show that this is Martin County's intent, and the Department did not tell Laniger that Laniger did not have to connect to the force main unless Martin County brought the line to the boundary of the WWTP site. If the Department had authority to require Laniger to connect to the Martin County force main when it became available, and in the absence of any rule criteria to determine when a centralized sewage collection and treatment facility is available, the determination would have to be based on reasonableness. Reasonableness in this context must take into account the cost of the connection. Cost is the inherent reason that Laniger was not required to connect to the Martin County centralized sewage collection and treatment facility without regard to whether the facility was available. Laniger showed that the cost of connecting to the force main is unreasonably high due to the need to construct a line beneath the railroad. Therefore, Laniger proved by a preponderance of the evidence that the Martin County force main is not available.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting Laniger Enterprises of America, Inc., a renewal of its wastewater treatment plant operating permit. The permit should contain the same conditions as were contained in the 1999 permit, with the exception of those conditions derived from Administrative Order No. AO 99-008- DW43SED. DONE AND ENTERED this 19th day of September, 2006, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of September, 2006.

Florida Laws (4) 120.569120.57403.087403.088
# 8
KYLE BROTHERS LAND COMPANY, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 76-000607 (1976)
Division of Administrative Hearings, Florida Number: 76-000607 Latest Update: Jun. 08, 1977

Findings Of Fact Kyle Brothers Land Company, Inc. filed its application with the Department of Environmental Regulation to excavate four canals and to unplug two canals which they had already dug within its development in Port Pine Heights located on Big Pine Key, Monroe County, Florida. The application of Kyle Brothers Land Company, Inc. was introduced as Composite Exhibit No. 1 and a plat of the proposed development was introduced as Exhibit 9. The proposed activity would be constructed on Class 3 waters as defined in Chapter 17-3, F.A.C. Test data submitted shows that the water quality of the water in the existing canals meets or exceeds the standards established in Section 17-3.09, F.A.C. The proposed canals, as well as the existing canals, are being developed as residential home sites. Two potential threats exist to the maintenance of water quality standards within the canals. The first threat is the short-term effect of increased turbidity of the waters due to the construction of the proposed activity. The second threat is the long-term effect of the increased pollution of the waters resulting from waste disposal through proposed septic tank systems to be used in the residential home sites adjoining the proposed and existing canals. The permit application appraisal, Exhibit 2, indicates that the short- term effects of increased turbidity could be controlled by the use of plugs, screens, and daily testing for turbidity and dissolved oxygen. The evidence further shows a variance in the depth of the existing canals and the two plugged canals. The two plugged canals and several of the existing canals have a depth greater than the central canal. The variance in depth permits the accumulation of debris and silt in the finger canals which under certain conditions could be stirred up and become suspended in the waters of the canals increasing the turbidity of the canals and violating the water quality standards. To prevent this from occurring these canals would have to be filled to bring them to the depth of the central canal. The long-term threat to water quality in the canals is the introduction into the canals of nutrients and chemicals attributable to surface water runoff and the proposed septic tank systems to be utilized on the residential home sites. Control of surface water runoff can be obtained by backs loping the uplands away from the canals. The control of nutrient loading associated with the septic tank systems is more complex. The Declaration of Restrictions for Port Pine Heights, Exhibit 7, recites that sewage disposal shall be by septic tank or central disposal plant. However, the plans submitted by the Applicant do not indicate any provision for establishment of a central disposal plant. Further, under the provisions of the deed restrictions there is no requirement that a resident of Port Pine Heights use a central disposal plant even if such a system were available. The current residents of Port Pine Heights currently use septic tank waste disposal systems; however, the number of current residents is substantially less than the number of residents that Port Pine Heights is designed to accommodate. The disposal of sewage by septic tanks will result in the introduction in the canal waters of partially treated effluent through exchange with subsurface waters in the porous limestone substrata present in the area. To maintain the water quality at the required level, the waste effluent from the residential development must be prevented from entering into the canal. Because of the substantial difference in the level of development existing in Port Pine Heights currently and the potential level of development, the test data and the projections based upon that data do not give reasonable assurances that the increased pollutions attributable to the use of septic tanks would not violate water-quality standards.

Recommendation Until the Applicant makes a reasonable, affirmative showing that the long- term effect of the activity will not violate the water-quality standards, the application should be denied. DONE and ORDERED this 22nd day of October, 1976 in Tallahassee, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION KYLE BROTHERS LAND COMPANY, INC. Petitioner, vs. CASE NO. 76-607 DEPARTMENT OF ENVIRONMENTAL REGULATION, Respondent. /

Florida Laws (1) 120.57
# 9
GRADY PARKER LANDSCAPING AND PAVING, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 89-001646 (1989)
Division of Administrative Hearings, Florida Number: 89-001646 Latest Update: Jul. 06, 1989

The Issue Whether the Petitioner's request for variance should be granted.

Findings Of Fact Petitioner owns a parcel of land in Palm Beach, County on which is housed Petitioner's paving and landscapping business and which is zoned for industrial use. Petitioner intends to install a manufactured building for use as an office. To provide sewage treatment for the bathroom of the office, Petitioner had a septic tank designed and applied for a septic tank permit which was denied as was its variance request. As a result of a complaint, Petitioner was inspected in August, 1988, by the Palm Beach County Department of Environmental Resources Management and by the Florida Department of Environmental Regulation. Both inspections yielded citiations for soil contamination by oil and other hazardous waste. Petitioner represented that most of the infractions had been rectified by the date of the hearing in this matter and pledged full cooperation with the County and State rules. To oversee the operation of the business and assure that no further problems arose, Petitioner decided to establish its office on site. The closest sewage treatment plant is at full capacity and does not intend to provide service to the parcel in the near future. The adjoining properties are serviced by septic tanks. As such, the proof did not demonstrate that alternative methods of waste disposal were available to the site However, as part of its business operation, Petitioner does minor repair of its equipment on site and may include oil changes and other such services. Although Petitioner does not intend to pollute the groundwater and intends to use the proposed septic tank for office use only, the proof demonstrated that waste disposal into a septic tank from the maintenance and repair of its equipment could result in the disposition of prohibited hazardous waste into the groundwater. Further, the proof failed to demonstrate that the septic tank would be protected from use by those who handled the hazardous waste. Although the hardship, if any, caused by the denial of the variance was not caused by Petitioner and the proof failed to demonstrate reasonable alternatives of waste disposal, the potential for an adverse affect of the operation to the groundwater is great. Additionally, the proof failed to establish the ameliorating conditions of soil, water table or setback conditions or whether the property was platted prior to 1972. Accordingly, the denial of the variance was proper.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered denying the variance. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 6th day of July 1989. JANE C. HAYMAN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of July 1989. COPIES FURNISHED: Hattie Parker 160 Toneypenna Drive Jupiter, Florida 33468 Peggy G. Miller, Esquire Department of Health and Rehabilitative Services 111 Georgia Avenue Third Floor West Palm Beach, Florida 33401 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Miller General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer