FIRST HOSPITAL CORPORATION vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 84-003768RX (1984)
Division of Administrative Hearings, Florida Number: 84-003768RX Latest Update: Oct. 24, 1985

Findings Of Fact Based on the stipulations 3/ and admissions of the parties, the exhibits received in evidence, and the testimony of the witnesses at hearing, I make the following findings of fact: FIRST HOSPITAL's address is the World Trade Center, Suite 870, Norfolk, Virginia 23510. CHARTER GLADE HOSPITAL is a freestanding psychiatric hospital located in Fort Myers, Lee County, Florida. CHARTER GLADE has (80) licensed psychiatric beds, and twenty-four (24) licensed substance-abuse beds. The service area served by CHARTER GLADE includes Collier, Lee, and Charlotte Counties. The address of HRS is 1317 Winewood Boulevard, Tallahassee, Florida 32301. HRS is responsible for the administration of the "Health Facilities and Health Services Planning Act," Section 381.493, et seq., Florida Statutes (the Act), and has implemented its provisions through the adoption of rules set forth in Chapter 10, Florida Administrative Code. FIRST HOSPITAL applied to HRS for a certificate of need (CON) for the establishment of a freestanding specialty hospital in Naples, Florida. Pursuant to the Act, a CON is required before FIRST HOSPITAL can establish its specialty hospital. FIRST HOSPITAL's application was denied by HRS. FIRST HOSPITAL appealed the denial of its application to the Division of Administrative Hearings, DOAH Case No. 84-1835. CHARTER GLADE has intervened in DOAH Case No. 84-1835. In this proceeding, Petitioner has challenged the validity of Rule 10- 5.11(25) and (26), Florida Administrative Code, asserting that the rule is arbitrary and capricious and, therefore, invalid. By virtue of the fact that CHARTER GLADE is an existing facility located in the same service area in which Petitioner proposes to construct and operate its facility, and further by virtue of its participation in DOAH Case No. 84-1835, at least in part, on the basis of the provisions of Rule 10 15.11(25) and (26), Florida Administrative Code, CHARTER GLADE is substantially affected by the issues presented for determination in this cause and should be allowed to participate as a party. The Act contemplates rule adoption by HRS of specialty bed-need methodologies for psychiatric services. See, e.g., Subsection 381.494(8)(g), Florida Statutes (1983). Toward this end, HRS has adopted Rules 10-5.11(25) and (26), Florida Administrative Code. Rule 10-5.11(25), cited as the basis for denying FIRST HOSPITAL's CON application, addresses need for short-term psychiatric beds; Rule 10-5.11(26) purports to address need for long-term psychiatric beds. FIRST HOSPITAL's substantial interest in establishing its proposed specialty hospital has been determined by both of these rules. In particular, Rule 10-5.11(25), Florida Administrative Code, was applied by HRS in the denial of FIRST HOSPITAL's CON application. In addition, FIRST HOSPITAL alleges that Rules 10-5.11(25) and (26) combined fail to assess the need for intermediate inpatient specialty psychiatric services, one of the types of psychiatric services proposed by FIRST HOSPITAL. FIRST HOSPITAL's CON application proposes intermediate inpatient specialty psychiatric services. Rules 10-5.11(25) and (26), Florida Administrative Code, were adopted in early 1983. The adoption process began in the summer of 1982 when HRS assigned to one of its employees, Elfie Stamm, the task of developing a bed-need rule for psychiatric services. Ms. Stamm, at that time, was a planner in the Office of Comprehensive Health Planning of HRS. Ms. Stamm has been a planner with HRS for several years and had been responsible for the development of the State Health Plan and for the development of various rules used in the CON process. She had also been employed in the Mental Health Program Office of HRS, where her responsibilities included the development of a state plan with regard to alcoholism and mental health. She was also responsible for monitoring statewide mental health programs. Upon being assigned the task of developing the subject rules, Ms. Stamm made a thorough review of all information available to HRS with regard to the number of existing psychiatric beds and programs throughout Florida. She also evaluated all available local health plans and spoke with various individuals who had been involved in health planning, particularly those with interest in mental health planning. Ms. Stamm surveyed the available literature on health planning emphasizing mental health planning and bed-need methodologies for psychiatric beds. Ms. Stamm wrote the initial draft of Rule 10-5.11(25) based upon her collection and evaluation of data regarding existing and approved psychiatric beds in Florida and her review of literature, both Florida specific and national. A primary feature of the drafts, as well as of the adopted version, of Rule 10-5.11(25) is a fixed bed-to-population ratio of .35/1000, meaning that normally there should be no more than .35 short-term psychiatric beds for each 1,000 persons. Ms. Stamm was instructed to develop rules to assess the need for inpatient psychiatric services. As finally adopted, short-term care is defined in Rule 10-5.11(25) as care not exceeding three months and averaging a length of stay of 30 days or less for adults and 60 days or less for children and adolescents, and long-term care is defined in Rule 10-5.11(26) as care averaging a length of stay of 90 days. Neither rule defines the term "intermediate care." The documents contained in HRS Composite Exhibit IX and reviewed by Ms. Stamm are a representative sample of the literature available in the field and the level of knowledge among health planners as of the date of the promulgation of the subject rules. The documents are a reasonable cross-section of the literature available in the area of psychiatric bed-need assessment. In terms of the literature that was available at the time of the rule adoption in the area of psychiatric bed-need assessment, there is nothing missing from these documents which would have been important to a health planner in developing a psychiatric bed-need methodology. There is discussion in those documents of all the basic methodologies for determining psychiatric bed need. After reviewing all of the available materials, the HRS established a range of from .35 to .37 beds per 1,000 population and from that point made a policy decision to establish a figure of .35 to use in the bed-need formula. In promulgating the subject rules HRS invited and received comment from a broad cross-section of the public, with particular emphasis on those persons and organizations with special knowledge and interest in the provision of mental health services and the determination of psychiatric bed need. HRS conducted a workshop to which it invited a broad cross-section of individuals and organizations with particular knowledge about psychiatric bed need, including representatives of the Florida Hospital Association, Florida Psychiatric Association, Florida Council for Community Mental Health, Florida State Association of District Mental Health Boards, Florida League of Hospitals, Florida Association of Voluntary Hospitals, and the Florida Alcohol and Drug Abuse Association. The comments and results of the workshop were considered by Ms. Stamm and HRS in the promulgation of the subject rules. In response to several requests, HRS conducted a public hearing in accordance with Section 120.54(3), Florida Statutes, to receive comments from interested persons on the subject rules. More than fifteen (15) people representing various hospitals and organizations concerned with psychiatric services entered appearances and made comments at the public hearing. In addition to the oral comment presented at the public hearing, various persons and organizations submitted numerous written comments expressing their opinion with regard to the proposed rules. The comments, both oral and written, were all considered by Ms. Stamm and HRS prior to the promulgation of the subject rules. The process engaged in by HRS, primarily through Ms. Stamm, in the development of the subject rules was extensive and reasonably calculated to invite substantive public comment and to procure the knowledge on the part of HRS necessary to write workable and rational rules concerning psychiatric bed need. The knowledge acquired by HRS through this process with regard to the assessment of psychiatric bed-need methodologies was reasonably sufficient to allow it to knowledgeably draft and promulgate the subject rules. Consideration of this substantive public comment led to several changes in the subject rules as originally drafted. As originally promulgated, Rules 10-5.11(25) and (26) were challenged pursuant to Section 120.54, Florida Statutes, in various petitions filed with the Division of Administrative Hearings. In settling these proposed rule challenges, HRS modified the rules to provide for even greater flexibility in their application. HRS Composite Exhibits I through XII constitute all written matters considered or produced by HRS in the rule adoption process with regard to the subject rules. All of those documents and papers have been maintained in the records of HRS since the promulgation of the subject rules. The statutory criteria for reviewing CON applications are set out in Sections 381.494(6)(c) and (d), Florida Statutes. Rule 10-5.11, Florida Administrative Code, sets forth the rule criteria against which CON applications are evaluated. Subsections (1) through (12) and (25) of Rule 10-5.11 are the rule criteria against which applications for CONs for short-term hospital inpatient psychiatric services are to be evaluated. Subsections (1) through and (26) of Rule 10-5.11 are rule criteria against which applications for CONs for long-term psychiatric services are to be evaluated. Rule 10-5.11(25) sets forth certain criteria specifically for the evaluation of CON applications for short term hospital inpatient psychiatric services. Short-term services are in part defined as services averaging a length of stay of thirty (30) days or less for adults and a stay of sixty (60) days or less for children and adolescents under eighteen (18) years. Rule 10- 5.11(25) in its adopted form provides in relevant part as follows: Short Term Hospital Inpatient Psychiatric Services. Short term hospital inpatient psychiatric services means a category of services which provides a 24-hour a day therapeutic milieu for persons suffering from mental health problems which are so severe and acute that they need intensive, full-time care. Acute psychiatric inpatient care is defined as a service not exceeding three months and averaging a length of stay of 30 days or less for adults and a stay of 60 days or less for children and adolescents under 18 years. Short term hospital inpatient psychiatric services may be provided in specifically designated beds in a hospital holding a general license, or in a facility holding a specialty hospital license. Applications for proposed short term hospital inpatient psychiatric services will be reviewed according to relevant statutory and rule criteria. A favorable need determination for proposed general acute care psychiatric inpatient services will not normally be given to an applicant unless a bed need exists according to paragraph (25)(d) of this rule. A favorable Certificate of Need determination may be made when the criteria, other than as specified in (25)(d), as provided for in Section 381.494(6)(c), Florida Statutes, and paragraph (25)(e) of this rule, demonstrate need. Bed allocations for acute care short term general psychiatric services shall be based on the following standards: A minimum of .15 beds per 1,000 population should be located in hospitals holding a general license to ensure access to needed services for persons with multiple health problems. These beds shall be designated as short term inpatient hospital psychiatric beds. .20 short term inpatient hospital beds per 1,000 population may be located in specialty hospitals, or hospitals holding a general license. The distribution of these beds shall be based on local need, cost effectiveness, and quality of care considerations. The short term inpatient psychiatric bed need for a Department service district five years into the future shall be calculated by subtracting the number of existing and approved beds from the number of beds calculated for year x based on a bed need ratio of .35 beds per 1,000 population projected for year and based on latest mid-range projections published by the Bureau of Economic and Business Research at the University of Florida. These beds are allocated in addition to the total number of general and acute care hospital beds allocated to each Department District established in Rule 10-5.11(23). Occupancy Standards. New facilities must be able to project an average 70 percent occupancy rate for adult psychiatric beds and 60 percent for children and adolescent beds in the second year of operation, and must be able to project an average 80 percent occupancy rate for adult beds and 70 percent for children and adolescent short term psychiatric inpatient hospital beds for the third year of operation. No additional short term inpatient hospital adult psychiatric beds shall normally be approved unless the average annual occupancy rate for all existing adult short term inpatient psychiatric beds in a service district is at or exceeds 75 percent for the preceding 12 month period. No additional beds for adolescents and children under 18 years of age shall normally be approved unless the average annual occupancy rate for all existing adolescent and children short term hospital inpatient psychiatric beds in the Department district is at or exceeds 70 percent for the preceding 12 2 month period. Hospitals seeking additional short term inpatient psychiatric beds must show evidence that the occupancy standard defined in paragraph six is met and that the number of designated short term psychiatric beds have had an occupancy rate of 75 percent or greater for the preceding year. Unit size. In order to assure specialized staff and services at a reasonable cost, short term inpatient psychiatric hospital based services should have at least 15 designated beds. Applicants proposing to build a new but separate psychiatric acute care facility and intending to apply for a specialty hospital license should have a minimum of 50 beds. Other standards and criteria to be considered in determining approval of a Certificate of Need application for short term hospital inpatient psychiatric beds are as follows: . . . . 7. Access standard. Short term inpatient hospital psychiatric services should be available within a maximum travel time of 45 minutes under average travel conditions for at least 90 percent of the service area's population. There are three basic types of methodologies generally accepted in the field of health planning as valid for determining the need for psychiatric hospital beds. The first type is a need-based methodology which evaluates the need for services. The second is a demand or utilization-based method, which utilizes current or projected utilization statistics for a particular service. The third is a fixed-ratio method which involves the use of a ratio, or rate, of service to population to determine projected need for that service in the future. All three of these methodologies are generally accepted and utilized by health planners throughout the United States. Each has its advantages and disadvantages, but all are valid. The fixed ratio methodology is that which HRS has employed in Rule 10 5.11(25). The ratio of .35 beds per thousand population is a reasonable ratio with a rational basis in fact. It is not arbitrary and capricious as a measure of short-term psychiatric bed need. The National Institute of Mental Health developed draft guidelines in the late 197Os suggesting a range of .15 beds to .40 beds per thousand population as an appropriate fixed-bed ratio program for psychiatric short-term acute-care programs. At least four other states presently or in the past have utilized a fixed bed-need ratio in planning for health care needs. They are Massachusetts, Indiana, Michigan and Georgia. Some of those states used fixed-bed ratios less than .35 per thousand. Ms. Stamm, in developing this rule methodology for HRS, considered and balanced the different approaches relating to the establishment of need. One of her concerns on behalf of HRS, in developing the methodology was to strike a proper balance between need and demand since not everyone who needs psychiatric care will choose to seek that care or can afford to seek that care. In 1982, during the time of the rule adoption process, the ratio of existing short-term psychiatric beds per thousand population in Florida was .29 per thousand. Ms. Stamm selected .35 per thousand, in part, to allow for growth in the number of psychiatric beds for reasons other than just population growth. The current rate of existing licensed short-term psychiatric beds in Florida in 1985 is .28 beds per thousand. However, the ratio for currently existing short-term psychiatric beds, plus CON approved beds not yet licensed in 1985, is .39 beds per thousand. The fact that the existing and approved inventory of psychiatric beds is greater than the .35 ratio specified in the rule demonstrates that HRS has applied Rule 10-5.11(25) in a flexible manner as envisioned by the "not normally" language in the rule. A theoretically ideal way to determine psychiatric bed need would be for HRS to go into each community and conduct epidemiological surveys to identify the people who actually need mental health care. While such a survey, properly conducted, might produce momentarily reliable date, it is not a realistic method for statewide planning purposes because of several problems attendant to such a methodology. Such a survey would be very expensive and very time-consuming and is not practical for use on a statewide basis in a state the size of Florida. Because of the time-consuming nature of such a methodology, if applied on a statewide basis, some of the data would be stale before all of the data was gathered. Further, the rapidly changing population in Florida would require that such a survey be continually updated. The allocation of short-term beds between general and specialty hospitals set forth in subsections (d)1 and 2 of Rule 10-5.11(25) has a rational basis in fact and is not arbitrary. There are many patients who simultaneously need medical as well as psychiatric care. To have those patients located in a specialty hospital, away from a general hospital, would be inappropriate. There are also patients who have acute episodes of psychiatric illness and who need to be treated very rapidly. Because there are many more general hospitals than there are freestanding psychiatric specialty hospitals, it is appropriate to ensure that psychiatric beds are available to general hospitals to fill the particular episodic acute needs. Further, there are many patients in Florida who can afford health care only through Medicaid. Because Medicaid does not provide funding of mental health inpatient services in psychiatric specialty hospitals, it is appropriate to include in the methodology an incentive for the location of some psychiatric beds in general hospitals where psychiatric services can be funded by Medicaid. The specific allocation of the .35 per thousand bed need ratio set forth in Rule 10-5.11(25)(d)(1) and (2) is that .15 beds per thousand "should" be associated with general hospitals and .20 beds per thousand "may" be associated with specialty hospitals. This allocation was designed to be flexible so that, in any given circumstance, an allocation other than the .15 and .20 guideline could be applied. The occupancy rate standards set forth in Rule 10 5.11(25) specify that normally, additional beds should not be approved unless the average occupancy of all existing beds in a service district exceeds 75 percent for adults and 70 percent for children and adolescents. The occupancy rate standards set forth in Rule 10- 5.11(25) were not arrived at in an arbitrary fashion and are reasonable in themselves. The occupancy rates are designed to ensure that a reasonable number of beds in each facility are filled. Hospitals with a substantial number of empty beds are not cost effective. Therefore, it is reasonable to project occupancy rates in the range of those projected in the subject rule. Indeed, the occupancy rates in the rule are liberal in terms of minimum occupancy levels, compared with those in the past and those recommended by others in the industry. With regard to the travel access standard in the rule, the Task Force for Institutional Care recommended a 60 minute travel standard for 90 percent of the population in the district. The 45 minute standard is reasonable. The rule does not exclude from within the travel standard area other facilities providing the same service. At the time of the final hearing, there were sixty five (65) existing hospital facilities in Florida which had psychiatric bed services. Of those sixty-five (65) facilities, sixty-one (61), or 93 percent, had more than fifteen (15) psychiatric beds, and fifty-five (55), or 84 percent, had more than twenty (20) psychiatric beds. In the exceptional event that the average occupancy rate for a particular district did not accurately reflect the availability of beds, the language of Rule 10-5.11(25)(d)5, which says that no additional beds shall "normally" be approved unless the occupancy rates are met is sufficiently flexible to account for the exceptionality. The methodology set forth in Rule 10-5.11(25) is designed to identify and express a need for short-term psychiatric inpatient beds for the overall population of Florida. The rule was intended to be sufficiently flexible that, when balanced with the other criteria set forth in Rule 10-5.11(1) through (12), it would allow substantive input from the district and community levels with regard to the need for beds by subpopulation groups such as child, adolescent, adult, and geriatric. The "national guidelines" referred to by Ms. Stamm were proposed hut never adopted. They recommended fixed bed ratios between .15/1000 and .40/1000. The guidelines were based on a 1978 survey by the National Institute of Mental Health (NIMH), which indicated that .15/1000 was the 25th percentile and .40/1000 was the 75th percentile of 1978 existing short-term psychiatric beds nationwide. The NIMH report stated that selection of an appropriate ratio for a particular state depended on the development of the state's mental health system and recognized that special consideration was necessary for traditionally underserved groups such as children, adolescents, and geriatrics. In the context of inpatient psychiatric care, there has been a trend over the last twenty years, and more particularly over the last five years, toward the development of specialty treatment programs, separately planned for children, adolescents, adults, and geriatrics. In recent years in Florida there has also been a trend toward the provision of alternatives to inpatient psychiatric services in facilities such as residential care. In 1982, Ms. Stamm considered evidence that children, adolescents, and geriatrics were not being adequately served by Florida's mental health facilities. Nevertheless, she did not plan for these subgroups in the rule because in her judgment decisions about allocation of services to subpopulation groups were best made at the district level by the local health councils.

Florida Laws (4) 120.54120.56120.57120.68
# 1
HCA HEALTH SERVICES OF FLORIDA, INC., D/B/A ST. LUCIE MEDICAL CENTER AND LAWNWOOD MEDICAL CENTER, INC., D/B/A LAWNWOOD REGIONAL MEDICAL CENTER vs AGENCY FOR HEALTH CARE ADMINISTRATION AND MARTIN MEMORIAL MEDICAL CENTER, INC., 07-003485CON (2007)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 26, 2007 Number: 07-003485CON Latest Update: Dec. 01, 2009

The Issue Whether an application for a new hospital to be constructed in Agency for Health Care Administration Planning District 9, Subdistrict 2, should be approved.

Findings Of Fact The Parties AHCA is the state agency charged with the responsibility of administering the CON program for the state of Florida. The Agency serves as the state heath planning entity. See § 408.034, Fla. Stat. (2007). As such, it was charged to review the CON application at issue in this proceeding. AHCA has preliminarily approved Martin's CON application No. 9981. The Petitioners are existing providers who oppose the approval of the subject CON. St. Lucie is a 194-bed acute care hospital located on U. S. Highway 1 in Port St. Lucie, Florida, that opened in 1983. Included in the bed count are 17 obstetric beds and 18 intensive care beds. St. Lucie utilizes 7 operating rooms and provides a varied list of surgical services. Although St. Lucie does not provide tertiary services, it offers an impressive array of medical options including general and vascular surgery, orthopedics, spine surgery, neurosurgery, and gynecology. Furthermore, St. Lucie is a designated stroke center and it is fully accredited by the Joint Commission on Accreditation of Healthcare Organizations (JCAHO). The JCAHO mission is to improve the safety and quality of care provided to the public through the provision of health care accreditation and related services that support performance improvement in health care organizations. St. Lucie uses a hospitalist program 7 days per week, 12 hours per day. The hospitalist program is a group of physicians who are employed by the hospital to manage the care of its patients. St. Lucie believes the hospitalist program moves patient cases more quickly and efficiently. St. Lucie has committed financial resources to its hospitalist program and hopes to expand its use in the future. The emergency department (ED) at St. Lucie handles approximately 42,000 visits per year. The ED has 24 beds comprised of 16 regular beds and 8 "fast track" beds. All areas are either curtained or separated by dividers to provide for patient privacy. Historically, St. Lucie has expanded the ED to provide for additional space for emergent patients. One of the strategies it has used includes the installation of special chairs in a waiting triaged area. The other Petitioner, Lawnwood, is located in Ft. Pierce, Florida, near I-95 and the Florida Turnpike. Lawnwood has 341 beds and, in additional to traditional medical/surgical options, provides tertiary services such as neurosurgery and open heart. Lawnwood also provides Level II neonatal intensive care services. Like St. Lucie, Lawnwood is fully accredited by JCAHO. Lawnwood has provided quality health care services to its region for over 30 years. The Lawnwood ED handles approximately 40,000 visits per year in a 28-bed unit. At its current location Lawnwood can expand its facilities should it desire to do so. At the current time, however, it has no plans for expansion of its main campus. It does plan to initiate an expansion of its intensive care unit. Financing for that expansion was anticipated to become more definite in 2009. In furtherance of its efforts to promote itself as a regional provider of quality medical services, Lawnwood has begun the arduous process of becoming a Level I trauma program for a multi-county area. In this regard, Lawnwood asserts that its service area for trauma patients encompasses Indian River County, St. Lucie County, parts of Okeechobee County, and portions of Martin County, Florida. Lawnwood has invested in the capital improvements needed to fully implement this program. The Petitioners are owned and operated by Hospital Corporation of America (HCA), a for-profit corporation headquartered in Nashville, Tennessee. HCA has input into the decisions affecting Petitioners and can influence when the improvements they hope to implement will be finalized. In addition to the Petitioners, other providers in the district include Indian River Hospital located in Vero Beach, Florida, and Martin Memorial Medical Center, Inc. with two hospitals in Martin County, Florida. It is the latter competitor that seeks to establish a new hospital in the western portion of St. Lucie County, Florida. Martin is a private, not-for-profit Florida corporation licensed to operate Martin Memorial Hospital North, in Stuart, Florida, and Martin Memorial Hospital South, in Port Salerno, Florida. The northern facility has 244 licensed beds; the southern hospital has 100 licensed beds. The northern hospital is the older provider and has served patients from St. Lucie and Martin Counties for over 70 years. Like Lawnwood, Martin offers a broad range of acute care hospital services including tertiary services. The options available at Martin include open-heart surgery, complex wound care, oncology, obstetrics, neonatal intensive care, pediatrics, and orthopedics. Martin provides high-quality medical services to its patients in both outpatient and inpatient venues. To that end Martin has been active in the western portion of St. Lucie County for a number of years and has solidified relationships with physicians in that area of the district. In this regard, Martin established an urgent care center in Port St. Lucie back in 1984. Since that time it has repeatedly sought to expand its provision of medical care to the residents of St. Lucie County. Martin constructed a physicians complex that employs and provides offices for physicians most of whom are on staff at St. Lucie. Over 80 percent of the patients from the Martin physician complex get admitted to St. Lucie. Martin also established a second outpatient facility in the western portion of St. Lucie County. This 70,000 square foot center provides 500-600 treatments per month to its patients. Among the services provided at this facility include a broad range of diagnostic and laboratory services, radiation therapy, rehabilitation therapy, and pediatric medicine. Finally, Martin also intends to establish a freestanding ED in the western portion of St. Lucie County in 2009. This facility will provide another access point for patients in the western portion of the county to facilitate a quicker response for patients who seek emergency care. Martin views this proposed freestanding ED as an interim measure and will convert it to an urgent care or other non-acute use if the proposed hospital it seeks to construct is approved. The Proposal Martin seeks to construct a general acute care hospital consisting of 80 beds, with intensive care, an ED, telemetry, and obstetrics. It will not offer tertiary services. The site for the proposed hospital is in an area known as "Tradition," a planned community in the western portion of St. Lucie County. The City of Port St. Lucie has annexed the geographical area into what residents consider "West Port St. Lucie" and have designated an area of Tradition to promote the life sciences industry. Accordingly, Tradition has areas reserved for medical office buildings, research facilities, as well as the hospital site to be used by Martin. Martin's proposed site is adjacent to the Torrey Pines Molecular Research Institute. The entire Tradition and West Port St. Lucie area is within AHCA's District 9, Subdistrict 2. By locating the new hospital in the western portion of the county, Martin maintains it will promote and enhance access for current and future residents of the developing area without adversely impacting St. Lucie and Lawnwood. Another advantage to a hospital in the western portion of the county is the option of having a haven in the event of a hurricane or natural disaster in the eastern portion of the county. Since the site is located to the west of the coastline, storm surges would not likely impact the facility or dictate evacuation. Further, the site provides excellent geographic access for traffic and the population of the expanding western portions of the county. Like other geographical areas, the coastal portion of the county faces “build out” that will limit the population expansion anticipated in that area. The proposed area has yet to face any limitation in that regard. It is the most likely geographic area that will expand as the population grows. HCA also recognized the benefits of the western area for future expansion of its medical facilities. It unsuccessfully negotiated to acquire a hospital site at or near the proposed location. In relation to the other parties, the proposed site is north and west of the Martin hospitals in Martin County, west of St. Lucie, and south and west of Lawnwood. The size of the parcel is adequate to construct the hospital. In reaching its decision to seek the approval of the new hospital, Martin considered input from many sources, including, but not limited to: physicians who practice in the vicinity of the proposed hospital; emergency response personnel who transport patients to the various district hospitals; medical researchers who have located to or are locating to the proposed area; elected officials familiar with the medical needs of the community; and health care planning professionals. The St. Lucie River divides St. Lucie County east to west. Only the areas west of the river have been designated as the primary service area for the proposed hospital. The primary service area comprises the land within zip codes 34983, 34984, 34986, 34953, 34987, and 34988. The secondary service area comprises those lands encompassed by zip codes 34981, 34982, 34952, and 34957. These primary and secondary service areas have been reasonably determined to project admissions and other relevant use data. As is later addressed in more detail, the population projected for the service area will reasonably support the utilization required to make the proposed hospital financially feasible. Review Criteria Every new hospital project in Florida must be reviewed pursuant to the statutory criteria set forth in Section 408.035, Florida Statutes (2007). Accordingly, the ten subparts of that provision must be weighed to determine whether or not a proposal meets the requisite criteria. In this case, the parties have identified the provisions of law that pertain to this matter. Section 408.035(1), Florida Statutes (2007) requires that the need for the health care facilities and health services being proposed be considered. In the context of this case, "need" will not be addressed in terms of its historical meaning. The Agency no longer calculates "need" pursuant to a need methodology. Therefore, looking to Florida Administrative Code Rule 59C-1.008, requires consideration of the following pertinent provisions: . . . If an agency need methodology does not exist for the proposed project: The agency will provide to the applicant, if one exists, any policy upon which to determine need for the proposed beds or service. The applicant is not precluded from using other methodologies to compare and contrast with the agency policy. If no agency policy exists, the applicant will be responsible for demonstrating need through a needs assessment methodology which must include, at a minimum, consideration of the following topics, except where they are inconsistent with the applicable statutory or rule criteria: Population demographics and dynamics; Availability, utilization and quality of like services in the district, subdistrict or both; Medical treatment trends; and, Market conditions. The existence of unmet need will not be based solely on the absence of a health service, health care facility, or beds in the district, subdistrict, region or proposed service area. According to Martin, "need" is evidenced by a large current and projected growing population in the proposed service area (PSA), sustained population growth that exceeds the district and state averages, capacity constraints at the existing providers, geographic access barriers including traffic congestion and the St. Lucie River, the need for improved access for emergency medical services, enhanced geographic and financial access to obstetrical services for residents of the western portion of the county, growth to offset impact on existing providers, and the financial health of existing providers. As previously stated, St. Lucie County is divided by the St. Lucie River. The river is crossed west-to-east by a limited number of bridges that can back up and delay the traffic utilizing them for access to St. Lucie. The county is traveled north to south by two major roadways: U.S. Highway 1 and I-95. To travel from the western portions of the county and the Tradition community, vehicles cross I-95, the river, and travel U.S. Highway 1 to St. Lucie. The PSA is the fastest growing portion of the county. The older areas to the east are not growing at the rate associated with the development of Tradition and other communities to the west. Some of the coastal areas to the east have become "saturated." That is to say, building and growth restrictions along the coast have limited the population in those areas. The western portion of the county is one of the most rapidly growing communities in the state and has become one of the focal areas of growth for the region. Although the rate of growth has slowed in the recent economic decline, the St. Lucie County area is still predicted to grow at an increased pace in the near future. Population projections prepared by the Bureau of Economics and Business Research at the University of Florida demonstrate that the growth reasonably expected for the PSA is fairly dramatic. According to Dr. Smith, whose testimony has been credited, the primary service area population is expected to reach or exceed 180,977 by 2015. If underestimated (as is typical of these types of projections), the growth could easily exceed that projection. The projection was based upon the most currently available data and has not been contradicted by more reliable data. Claritas data also suggested that the projections produced by Dr. Smith's work were reasonable. The projected growth rate in the primary service area exceeds the projected growth rate of the district as well as for Florida for the period 2007-2015. This finding is supported by the credible weight of the data admitted into evidence. Although the population growth has slowed due to economic conditions, the county will experience renewed growth in the PSA with the projected reversal of slowing trends. Development in the PSA continues to be the most likely geographic area that will be improved first and faster than other areas of the county. Looking at the age component of the population projected for the PSA, the age 65 and over cohort is the fastest growing segment of the population; the second is the 45-64 population segment. These segments are the majority of the acute care hospital utilization. Additionally, females ages 15- 44 also reflect a high rate of growth for the primary service area. This latter statistic supports the notion that a demand for obstetrics is likely. Acute care hospital utilization in the subdistrict increased from 2003 through June 2008. The non-tertiary discharges within the primary service area increased by 42 percent for the period 2003 to 2007. Birth volume in the primary service area increased for the same period and doubled the number of obstetric admissions for the time noted. This increase in utilization supports the likelihood that population growth for the area will further increase the utilizations expected for the PSA. Historically, St. Lucie has observed this utilization and growth of demand for its services. St. Lucie has responded by adding beds to its ED but the projections would suggest that past and future growth will result in capacity constraints for St. Lucie. Demand for intensive care, medical surgical beds, and progressive care beds at St. Lucie has been high. The ICU occupancy rate at St. Lucie in particular has been at or above 85 percent capacity a significant portion of the time. Capacity issues are more pronounced during the months from November through May of each year. The subdistrict enjoys a strong seasonal influx of residents who require all the amenities of a community including medical care. In this regard, St. Lucie has seen a "bed crunch" in order to accommodate the seasonal patients. This crunch results in longer ED waits, longer waits for admissions for those requiring acute care, longer waits for those seeking elective admissions, and longer waits for some services such as blood transfusions. Although hospitals are not intended to be like fast food restaurants (providing all services on a expedited basis), extended waits for bed placement can place waiting patients on gurneys in less than optimal conditions. This scenario does not promote efficient or the most effective form of providing health care services to those in need. The bed crunch at St. Lucie is expected to continue due to increasing demand for acute care hospital services in the county. Capacity constraints are similarly demonstrated at Lawnwood and Martin. Like St. Lucie, Lawnwood and Martin experience the seasonal crunch associated with the increased population during the winter months. In Lawnwood's case, the ED has delays through out the year. This means that patients wait for a bed assignment in the ED until a suitable room placement can be made. Additionally, the intensive care unit at Lawnwood experiences high occupancy. As Lawnwood transitions to a trauma center, the demand for acute care beds will also increase. Lawnwood will be the sole trauma center for the region and will likely receive an increase in utilization from that patient source. Martin also has experienced high utilization and has operated at or near capacity for extended periods during the season. Further, the birth volume growth for Martin supports the conclusion that additional obstetric beds are needed for the subdistrict. The majority of Martin's increased birth volume has come from the PSA. Martin has also established that obstetrics patients travel from areas closer to Lawnwood or St. Lucie to seek services at Martin. This demand for obstetrical services in the PSA also suggests that the proposed hospital would enhance access to obstetrics in the subdistrict. Patients who might be induced (as the mother is past her due date) for labor must, at times, wait for a delivery bed. Additionally, patients who present in labor do not always have a labor bed. The new facility would ease these constraints. The location of the hospital at Tradition will also improve geographic access to medical facilities. The traffic and natural barriers to health care services (limited west to east roadways and the river) would be eliminated by the proposed facility. Additionally, during periods of storm events, residents throughout the subdistrict would have access to an acute care hospital without driving to the coastal area. The demand for emergency medical response and transport in St. Lucie County has increased dramatically. The St. Lucie County Fire Department transports all patients requiring advanced life support services in the county. When traveling from the western portions of the county, the emergency transports use the same roadways to cross the river as the general population. Delays are common. Even after delivering a patient to the St. Lucie ED, the transport must return west from its point of origin in order to return to service. The delays in traversing the county result in delays for the unit to be able to respond to the next call. Although it is impractical to have a hospital on every corner, the establishment of a hospital at Tradition would greatly enhance the response times for emergency vehicles and enhance their ability to return to service more quickly. To respond to the increased population and need in the Tradition community, the county has established two new fire stations in the area. The primary service area has the greatest need for additional fire and emergency services according to Chief Parrish. To help address the problem of having rescue units out of service for extended periods of time while transporting patients to an existing hospital east of the river (or while they are returning west to their service area), the Fire Department has doubled rescue trucks and paramedics at two stations in the western portion of the county. This duplication of manpower and equipment increases emergency costs for the county. Although there are plans for the construction of another bridge across the river that would ease some of the congestion in crossing the county, it is unknown when that bridge will be funded and constructed. City personnel do not expect the bridge to be started prior to 2017. The proposed hospital will provide improved access for emergency medical services. The proposed hospital will provide enhanced access to obstetrical services for the residents of the PSA. With regard to financial access, the weight of the credible evidence supports the finding that residents of the PSA are able to adequately access medical services. Existing providers are meeting the needs of the needy and those without ability to pay. Although the new hospital would provide a closer point of service for the indigent or Medicaid recipients who may lack transportation advantages of the more affluent, the needy are currently being served by existing providers. The existing providers are financially healthy and are well able to meet the needs of the indigent. Should the new hospital siphon off the more desirable patients (ie. the insured, Medicare, self-pay, etc.), the existing providers should be able to continue to provide the indigent care needed by the subdistrict. Additionally, the new hospital would also be expected to accept Medicaid or indigent patients. Travel times within the subdistrict further suggest that the addition of a new hospital would reduce the time for all residents to arrive at an acute care hospital. Although the travel times currently suggest that patients could access an existing provider within 40 minutes, the addition of the new facility would ensure that during crunch times or times of traffic congestion or other times when factors extend the time for access to service, any patient from the PSA can be assured of prompt medical care. Establishment of the new hospital will also improve access in the event of a catastrophe or disaster. Given the recent history of hurricanes in the state, improved access to medical facilities in times of crisis can be critical to the patient as well as the emergency crews working during such events. To the extent that any existing provider loses admissions to the new hospital, the growth in population and projected admissions will adequately offset the loss of admissions. Further, the utilization expected by all providers will adequately assure their financial stability as the new provider achieves or exceeds its projected goals. Martin has demonstrated a strong financial position for a number of years. The establishment of the new hospital will not compromise Martin's financial strength or detract from its provision of services at the two hospital campuses it currently utilizes. The new, third campus will complement and enhance the Martin Health Care System. Martin has demonstrated the project is financially feasible both in the short and long term. Martin's past financial performance and continued strong financial position assure that it will be able to obtain financing for the proposed hospital construction and start up. Moreover, the projected patient days to be captured by the new hospital will assure that the hospital will achieve its "break even" financial point at a reasonable future date. The project should achieve revenues in excess of expenses by its third year of operation. The projections for utilization are reasonable and are based upon reasonable assumptions including the premise that Martin will redirect admissions from its southern facilities to services more geographically accessible at the new hospital. Martin has an established presence in the PSA and should be able to achieve its expected admissions without adversely impacting St. Lucie or Lawnwood. The revenue projections for the new hospital are reasonable and should be achieved. Martin has the resources, the workforce, and physician coverage to provide for the new hospital. Additionally, it is expected that new physicians will seek privileges at the new hospital and will provide emergency on-call coverage as may be needed. St. Lucie and Lawnwood have coverage for the medical specialties and ED departments at their facilities. Martin has a low vacancy and turnover rate for both nursing and non-nursing personnel. It partners with the community to sponsor initiatives that promote continued success in these areas. It is a favored employer among those in Martin County. The staffing projections for nursing and clinical support for the new hospital are reasonable. The projected salaries are also in line with those currently offered and should be reasonable and easily achieved. In short, the applicant has demonstrated that Schedule 6A of the application is supported by the record in this cause. Martin has demonstrated it is able to implement the project and to staff its needs at the levels projected by the application. St. Lucie County will grow at a sufficient rate to assure that all providers, including the proposed hospital, will have admissions to meet the financial needs of the institutions. Moreover, the growth anticipated is sufficient to fund the future improvements or expansions that may be required by the providers. Essentially, when considered as a whole, west to east, the county has sufficient growth potential to support the additional acute care hospital beds proposed by the applicant. Competition for the future beds will be enhanced by the additional provider. St. Lucie and Lawnwood will continue to perform well in the market. St. Lucie will continue to achieve the lion's portion of the market east of the river while Lawnwood will continue to serve the region as it has with tertiary and the newly added trauma services. If anything, Martin will take the largest hit from the establishment of the new hospital as it will seek to allow its patients from the PSA that currently travel south and east to Martin hospitals to remain in their community at the new facility. Acting as the "mother ship," Martin is willing to promote the new hospital so that the stresses it has at the Martin County hospitals may be alleviated. The Martin system as a whole will continue to grow and benefit from the addition of the new hospital. Martin is the chief initiator of medical services to the western St. Lucie County community. No HCA hospital has attempted to establish a presence in the Tradition area that matches or exceeds the commitment Martin has made to the residents of western St. Lucie County. St. Lucie and Lawnwood will continue to provide quality care to their patients and will continue to be financially strong should the new hospital come on line. The adverse impact suggested by the HCA hospitals is not supported by the weight of the credible evidence in this cause. In short, the market projections are adequate to assure all providers will continue to share a significant portion of the health care pie. The growth in population, growth in admissions and utilization, the demographics of the population, and the reputation of all providers to provide quality care support the long term success of all providers in the subdistrict. The establishment of the new hospital will also promote competition as medical and clinical research also come into play. Should the new hospital located near the research facilities promote clinical trials, all providers in the subdistrict would benefit from any successful achievements. Martin has agreed to the following conditions for the CON: Martin will partner with Torrey Pines Institute for Molecular Studies for the provision of resources associated with clinical trials and life science research. Martin will continue to support the Volunteers in Medicine program with free inpatient and outpatient hospital services, outpatient laboratory, diagnostic and treatment services at a value of not less than $750,000 of charges per year for the next 10 years. Martin will support other community social services organizations in the form of cash, goods and services valued at not less than $75,000 annually for the next 10 years. This represents a commitment of $750,000 to support organizations such as Meals on Wheels, American Cancer Society, American Heart Association, etc. Martin will support Florida Atlantic University Nursing School, Indian River Community College and other area nursing and allied health schools with at least $75,000 per year in services or goods for the next 10 years to help ensure an adequate supply of well-trained health care professionals. Martin will establish a volunteers program (based on its current successful program in Martin County) in Port St. Lucie area to involve local high schools in encouraging teens to volunteer in health care settings and to encourage health care careers. Martin will partner with the St. Lucie school system in the development of a High School Medical Academy. Martin will make the West Port St. Lucie Hospital available as a training site for area nursing and allied health schools and for the Florida State University physician training program. Martin will locate the new hospital south of Tradition Parkway, east of Village Parkway, adjacent to the Torrey Pines headquarters and the I-95 Gatlin Boulevard exit. Martin will provide a minimum of 11.1 percent of its total annual patient days in the new hospital to Medicaid and Medicaid HMO patients. Martin will also provide a minimum of $250,000 per year for Medicaid and/or charity outreach programs within the western Port St. Lucie area for the first five years of operation. This is not the first CON application submitted by Martin to establish a hospital in the western portion of St. Lucie County. The current application differs from others in that the updated population and utilization data more clearly establish that the projected growth for the subdistrict will support the new facility without unduly impacting the existing providers. The planning horizon for the instant application and the pertinent data show that the western portion of the county more closely resembles areas that have been granted satellite or new hospital facilities in other areas of the state. The growth projected for the county mandates additional healthcare resources be devoted to the PSA. Additionally, similar to its commitment to the Martin County residents, the applicant has demonstrated it will partner with the St. Lucie County resources to establish the same programs that have benefited other areas of the subdistrict. Finally, while the Torrey Pines affiliation was represented in prior applications, that facility is now a reality and operational. The benefits of having the Martin hospital adjacent to its facility is no longer speculative. Torrey Pines is a nationally recognized research entity. The State of Florida and St. Lucie County governmental entities have pursued this type of research facility for location to the state and this area. According to the Torrey Pines leadership, the location of the Martin hospital in proximity to its facility would enhance their efforts. The architectural schematics, project completion schedule, design narratives, and code compliance information set fort in Martin's application are reasonable. The site preparation and construction costs set forth on Schedule 9 are reasonable for the project proposed. Additionally, the equipment costs are reasonable. There is no financial barrier to access hospital services by the residents of the PSA. The quality of care rendered by all hospitals in the subdistrict is excellent. Although there may be some impact on the admissions and utilization at St. Lucie, the impact is not of such a magnitude so as to adversely impact the quality of care and provision of health services at that hospital. The impact expected at Lawnwood should be less than St. Lucie, nevertheless, it too is not of such a magnitude so as to adversely impact the quality of care and provision of health services at that hospital. Section 408.035(2), Florida Statutes (2007), specifies that the availability, quality of care, accessibility, and extent of utilization of existing health care facilities and health services in the service district must be considered. As noted above, there is no barrier to services in the subdistrict. Nevertheless, Martin has demonstrated that access to additional services will be enhanced by the establishment of the new hospital in the western area of the county. Additionally, delays in admissions and capacity constraints at the existing hospitals although not chronic or at a critical juncture are evidenced in the record. Section 408.035(3), Florida Statutes (2007), requires the consideration of the ability of the applicant to provide quality of care and the applicant's record of providing quality of care. This criterion is not in dispute in this cause. Section 408.035(4), Florida Statutes (2007), requires the review of the availability of resources, including health personnel, management personnel, and funds for capital and operating expenditures, for project accomplishment and operation. In this regard, Martin has established that it is able to provide the resources necessary for this project. Additionally, it has shown that projected salaries for the nurses (as depicted on Schedule 6A) are reasonable and within the general guidelines of Martin's provision of those services at its other hospitals. Section 408.035(5), Florida Statutes (2007), specifies that the Agency must evaluate the extent to which the proposed services will enhance access to health care for residents of the service district. In the findings reached in this regard, the criteria set forth in Administrative Code Rule 59C-1.030(2) have been fully considered. Those provisions are: (2) Health Care Access Criteria. The need that the population served or to be served has for the health or hospice services proposed to be offered or changed, and the extent to which all residents of the district, and in particular low income persons, racial and ethnic minorities, women, handicapped persons, other underserved groups and the elderly, are likely to have access to those services. The extent to which that need will be met adequately under a proposed reduction, elimination or relocation of a service, under a proposed substantial change in admissions policies or practices, or by alternative arrangements, and the effect of the proposed change on the ability of members of medically underserved groups which have traditionally experienced difficulties in obtaining equal access to health services to obtain needed health care. The contribution of the proposed service in meeting the health needs of members of such medically underserved groups, particularly those needs identified in the applicable local health plan and State health plan as deserving of priority. In determining the extent to which a proposed service will be accessible, the following will be considered: The extent to which medically underserved individuals currently use the applicant’s services, as a proportion of the medically underserved population in the applicant’s proposed service area(s), and the extent to which medically underserved individuals are expected to use the proposed services, if approved; The performance of the applicant in meeting any applicable Federal regulations requiring uncompensated care, community service, or access by minorities and handicapped persons to programs receiving Federal financial assistance, including the existence of any civil rights access complaints against the applicant; The extent to which Medicare, Medicaid and medically indigent patients are served by the applicant; and The extent to which the applicant offers a range of means by which a person will have access to its services. In any case where it is determined that an approved project does not satisfy the criteria specified in paragraphs (a) through (d), the agency may, if it approves the application, impose the condition that the applicant must take affirmative steps to meet those criteria. In evaluating the accessibility of a proposed project, the accessibility of the current facility as a whole must be taken into consideration. If the proposed project is disapproved because it fails to meet the need and access criteria specified herein, the Department will so state in its written findings. AHCA does not require that a CON applicant demonstrate that the existing acute care providers within the PSA are failing in order to approve a new hospital. Also, AHCA does not have a travel time standard with respect to the provision of acute care hospital services. In other words, there is no set geographical distance or travel time that dictates when a hospital would be appropriate or inappropriate. In fact, AHCA has approved hospitals when residents of the PSA live within twenty minutes of an existing hospital. As a practical matter this means that travel time or distance do not dictate whether a satellite should be approved based upon access. With regard to access to emergency services, however, AHCA does consider patient convenience. In this case, the proposed hospital will provide a convenience to residents of western St. Lucie County in terms of access to an additional emergency department. Further, physicians serving the growing population will have the convenience of admitting patients closer to their residences. Medical and surgical opportunities at closer locations is also a convenience to the families of patients because they do not have to travel farther distances to visit the patient. Patients and the families of patients seeking obstetrical services will also have the convenience of the hospital. Patients who would not benefit from the convenience of the proposed hospital would be those requiring tertiary health services. Florida Administrative Code Rule 59C-1.002(41) defines such services as: (41) Tertiary health service means a health service which, due to its high level of intensity, complexity, specialized or limited applicability, and cost, should be limited to, and concentrated in, a limited number of hospitals to ensure the quality, availability, and cost effectiveness of such service. Examples of such service include, but are not limited to, organ transplantation, specialty burn units, neonatal intensive care units, comprehensive rehabilitation, and medical or surgical services which are experimental or developmental in nature to the extent that the provision of such services is not yet contemplated within the commonly accepted course of diagnosis or treatment for the condition addressed by a given service. In terms of tertiary health services, residents of the subdistrict will continue to use the existing providers who offer those services. The new hospital will not compete for those services. Lawnwood will continue to provide tertiary services to the PSA and will continue to be a strong candidate for any patient in the PSA requiring trauma services when that service comes on line. Section 408.035(6), Florida Statutes (2007) provides that the financial feasibility of the proposal both in the immediate and long-term be assessed in order to approve a CON application. In this case, as previously indicated, the utilizations expected for the new hospital should adequately assure the financial feasibility of the project both in the immediate and long-term time frames. Population growth, a growing older population, and technologies that improve the delivery of healthcare will contribute to make the project successful. The new Martin hospital will afford PSA residents a meaningful option in choosing healthcare and will not give any one provider or entity an unreasonable or dominant position in the market. Section 408.035(7), Florida Statutes (2007) specifies that the extent to which the proposal will foster competition that promotes quality and cost-effectiveness must be addressed. This subdistrict enjoys a varied range of healthcare providers. All demonstrate strong financial stability and utilization. A new hospital will promote continued quality and cost-effectiveness. Physicians will have another option for admissions and convenience. Section 408.035(8), Florida Statutes (2007), notes that the costs and methods of the proposed construction, including the costs and methods of energy provision and the availability of alternative, less costly, or more effective methods of construction should be reviewed. The methodology used to compute the construction costs associated with this project were reasonable and accurate at the time prepared. No more effective method of construction has been proposed. The financial soundness of the proposal should cover the actual costs associated with the construction of the project. Additionally, the free-standing ED that Martin is constructing will be transitioned to a urgent care clinic or some other health care facility, it will not continue to provide emergent services when the new hospital is on line. Therefore, it should not be considered a less costly alternative for ED services. Section 408.035(9), Florida Statutes (2007), provides that the applicant's past and proposed provision of health care services to Medicaid patients and the medically indigent should be weighed in consideration of the proposal. Martin has a track record of providing health care services to Medicaid patients and the medically indigent without consideration of any patient's ability to pay. The new hospital would be expected to continue this tradition. Moreover, this criterion is adequately addressed by the proposed conditions to the CON approval. Section 408.035(10), Florida Statutes, relates to nursing home beds and is not at issue in this proceeding. The Agency's Rationale The SAAR set forth the Agency's rationale for the proposed approval of the CON application. The SAAR acknowledged that the proposal received varied support from numerous sources. Further, the SAAR acknowledged that funding for the project would be available; that the short-term position, long-term position, capital requirements, and staffing for the proposal were adequate; that the project was financially feasible if the applicant meets its projected occupancy levels; that the project would have a positive effect on competition to promote quality and cost-effectiveness; and that the construction schedule is reasonable. The SAAR also recognized the improved access for obstetrical services for residents of the growing western St. Lucie County. This also reinforced the generally recognized improvements to access geographically given the limitations in east-west traffic access. Finally, the SAAR recognized that Martin is the provider that has invested in the western portion of the subdistrict by establishing clinics and physician networks to provide care to the residents of the PSA. Opponents to the new hospital have not similarly committed to the residents of western St. Lucie County. The opponents maintain that enhanced access for residents of the PSA does not justify the establishment of a new hospital since the residents there already have good access to acute care services.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered by the Agency for Health Care Administration that approves CON Application No. 9981 with the conditions noted in the SAAR. DONE AND ENTERED this 31st day of July, 2009, in Tallahassee, Leon County, Florida. J. D. PARRISH Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 31st day of July, 2009. COPIES FURNISHED: Paul H. Amundsen, Esquire Julie Smith, Esquire Amundsen & Smith 502 East Park Avenue Post Office Drawer 1759 Tallahassee, Florida 32302 Karin M. Byrne, Esquire Agency for Health Care Administration Fort Knox Building III, Mail Station 3 2727 Mahan Drive, Suite 3431 Tallahassee, Florida 32308 Robert A. Weiss, Esquire Karen A. Putnal, Esquire Parker, Hudson, Rainer & Dobbs, LLP The Perkins House, Suite 200 118 North Gadsden Street Tallahassee, Florida 32301 Stephen A. Ecenia, Esquire J. Stephen Menton, Esquire David Prescott, Esquire Rutledge, Ecenia, & Purnell 215 South Monroe Street, Suite 420 Post Office Box 551 Tallahassee, Florida 32302-0551 Richard J. Shoop, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Justin Senior, General Counsel Agency for Health Care Administration Fort Knox Building, Suite 3431 2727 Mahan Drive, Mail Stop 3 Tallahassee, Florida 32308 Holly Benson, Secretary Fort Knox Building, Suite 3116 2727 Mahan Drive Tallahassee, Florida 32308-5403

Florida Laws (6) 120.569120.57400.235408.034408.035408.039 Florida Administrative Code (3) 59C-1.00259C-1.00859C-1.030
# 2
MORTON PLANT HOSPITAL ASSOCIATION, INC., D/B/A NORTH BAY HOSPITAL vs AGENCY FOR HEALTH CARE ADMINISTRATION AND NEW PORT RICHEY HOSPITAL, INC., D/B/A COMMUNITY HOSPITAL OF NEW PORT RICHEY, 02-003232CON (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 14, 2002 Number: 02-003232CON Latest Update: May 17, 2004

The Issue Whether the certificate of need (CON) applications filed by New Port Richey Hospital, Inc., d/b/a Community Hospital of New Port Richey (Community Hospital) (CON No. 9539), and Morton Plant Hospital Association, Inc., d/b/a North Bay Hospital (North Bay) (CON No. 9538), each seeking to replace and relocate their respective general acute care hospital, satisfy, on balance, the applicable statutory and rule criteria.

Findings Of Fact The Parties AHCA AHCA is the single state agency responsible for the administration of the CON program in Florida pursuant to Chapter 408, Florida Statutes (2000). The agency separately reviewed and preliminarily approved both applications. Community Hospital Community Hospital is a 300,000 square feet, accredited hospital with 345 licensed acute care beds and 56 licensed adult psychiatric beds, located in southern New Port Richey, Florida, within Sub-District 5-1. Community Hospital is seeking to construct a replacement facility approximately five miles to the southeast within a rapidly developing suburb known as "Trinity." Community Hospital currently provides a wide array of comprehensive inpatient and outpatient services and is the only provider of obstetrical and adult psychiatric services in Sub-District 5-1. It is the largest provider of emergency services in Pasco County with approximately 35,000 visits annually. It is also the largest provider of Medicaid and indigent patient days in Sub-District 5-1. Community Hospital was originally built in 1969 and is an aging facility. Although it has been renovated over time, the hospital is in poor condition. Community Hospital's average daily census is below 50 percent. North Bay North Bay is a 122-bed facility containing 102 licensed acute care beds and 20 licensed comprehensive medical rehabilitation beds, located approximately one mile north of Community Hospital in Sub-District 5-1. It serves a large elderly population and does not provide pediatric or obstetrical care. North Bay is also an aging facility and proposes to construct a replacement facility in the Trinity area. Notably, however, North Bay has spent approximately 12 million dollars over the past three years for physical improvements and is in reasonable physical condition. Helen Ellis Helen Ellis is an accredited hospital with 150 licensed acute care beds and 18 licensed skilled nursing unit beds. It is located in northern Pinellas County, approximately eight miles south of Community Hospital and nine miles south of North Bay. Helen Ellis provides a full array of acute care services including obstetrics and cardiac catheterization. Its daily census average has fluctuated over the years but is approximately 45 percent. Mease Mease operates two acute care hospitals in Pinellas County including Mease Dunedin Hospital, located approximately 18 to 20 miles south of the applicants and Mease Countryside Hospital, located approximately 16 to 18 miles south of Community and North Bay. Each hospital operates 189 licensed beds. The Mease hospitals are located in the adjacent acute care sub-district but compete with the applicants. The Health Planning District AHCA's Health Planning District 5 consists of Pinellas and Pasco Counties. U.S. Highway 41 runs north and south through the District and splits Pasco County into Sub- District 5-1 and Sub-District 5-2. Sub-District 5-1, where Community Hospital and North Bay are located, extends from U.S. 41 west to the Gulf Coast. Sub-District 5-2 extends from U.S. 41 to the eastern edge of Pasco County. Pinellas County is the most densely populated county in Florida and steadily grows at 5.52 percent per year. On the other hand, its neighbor to the north, Pasco County, has been experiencing over 15 percent annual growth in population. The evidence demonstrates that the area known as Trinity, located four to five miles southeast of New Port Richey, is largely responsible for the growth. With its large, single- owner land tracts, Trinity has become the area's fuel for growth, while New Port Richey, the older coastal anchor which houses the applicants' facilities, remains static. In addition to the available land in Trinity, roadway development in the southwest section of Pasco County is further fueling growth. For example, the Suncoast Highway, a major highway, was recently extended north from Hillsborough County through Sub-District 5-1, west of U.S. 41. It intersects with several large east-west thoroughfares including State Road 54, providing easy highway access to the Tampa area. The General Proposals Community Hospital's Proposal Community Hospital's CON application proposes to replace its existing, 401-bed hospital with a 376-bed state- of-the-art facility and relocate it approximately five miles to the southeast in the Trinity area. Community Hospital intends to construct a large medical office adjacent to its new facility and provide all of its current services including obstetrical care. It does not intend to change its primary service area. North Bay's Proposal North Bay's CON application proposes to replace its existing hospital with a 122-bed state-of-the-art facility and also plans to relocate it approximately eight miles to the southeast in the Trinity area of southwestern Pasco County. North Bay intends to provide the same array of services it currently offers its patients and will not provide pediatric and obstetrical care in the proposed facility. The proposed relocation site is adjacent to the Trinity Outpatient Center which is owned by North Bay's parent company, Morton Plant. The Outpatient Center offers a full range of diagnostic imaging services including nuclear medicine, cardiac nuclear stress testing, bone density scanning, CAT scanning, mammography, ultrasound, as well as many others. It also offers general and specialty ambulatory surgical services including urology; ear, nose and throat; ophthalmology; gastroenterology; endoscopy; and pain management. Approximately 14 physician offices are currently located at the Trinity Outpatient Center. The Condition of Community Hospital Facility Community Hospital's core facilities were constructed between 1969 and 1971. Additions to the hospital were made in 1973, 1975, 1976, 1977, 1979, 1981, 1992, and 1999. With an area of approximately 294,000 square feet and 401 licensed beds, or 733 square feet per bed, Community Hospital's gross area-to-bed ratio is approximately half of current hospital planning standards of 1,600 square feet per bed. With the exception of the "E" wing which was completed in 1999, all of the clinical and support departments are undersized. Medical-Surgical Beds And Intensive Care Units Community Hospital's "D" wing, constructed in 1975, is made up of two general medical-surgical unit floors which are grossly undersized. Each floor operates 47 general medical-surgical beds, 24 of which are in three-bed wards and 23 in semi-private rooms. None of the patient rooms in the "D" wing have showers or tubs so the patients bathe in a single facility located at the center of the wing on each floor. Community Hospital's "A" wing, added in 1973, is situated at the west end of the second floor and is also undersized. It too has a combination of semi-private rooms and three-bed wards without showers or tubs. Community Hospital's "F" wing, added in 1979, includes a medical-surgical unit on the second and third floor, each with semi-private and private rooms. The second floor unit is centrally located between a 56-bed adult psychiatric unit and the Surgical Intensive Care Unit (SICU) which creates security and privacy issues. The third floor unit is adjacent to the Medical Intensive Care Unit (MICU) which must be accessed through the medical-surgical unit. Neither intensive care unit (ICU) possesses an isolation area. Although the three-bed wards are generally restricted to in-season use, and not always full, they pose significant privacy, security, safety, and health concerns. They fail to meet minimum space requirements and are a serious health risk. The evidence demonstrates that reconfiguring the wards would be extremely costly and impractical due to code compliance issues. The wards hinder the hospital's acute care utilization, and impair its ability to effectively compete with other hospitals. Surgical Department and Recovery Community Hospital's surgical department is separated into two locations including the main surgical suite on the second floor and the Endoscopy/Pain Management unit located on the first floor of "C" wing. Consequently, the department cannot share support staff and space such as preparation and recovery. The main surgical suite, adjacent recovery room, and central sterile processing are 25 years old. This unit's operating rooms, cystoscopy rooms, storage areas, work- stations, central sterile, and recovery rooms are undersized and antiquated. The 12-bay Recovery Room has no patient toilet and is lacking storage. The soiled utility room is deficient. In addition, the patient bays are extremely narrow and separated by curtains. There is no direct connection to the sterile corridor, and staff must break the sterile field to transport patients from surgery to recovery. Moreover, surgery outpatients must pass through a major public lobby going to and returning from surgery. The Emergency Department Community Hospital's existing emergency department was constructed in 1992 and is the largest provider of hospital emergency services in Pasco County, handling approximately 35,000 visits per year. The hospital is also designated a "Baker Act" receiving facility under Chapter 394, Florida Statutes, and utilizes two secure examination rooms for emergent psychiatric patients. At less than 8,000 total square feet, the emergency department is severely undersized to meet the needs of its patients. The emergency department is currently undergoing renovation which will connect the triage area to the main emergency department. The renovation will not enlarge the entrance, waiting area, storage, nursing station, nor add privacy to the patient care areas in the emergency department. The renovation will not increase the total size of the emergency department, but in fact, the department's total bed availability will decrease by five beds. Similar to other departments, a more meaningful renovation cannot occur within the emergency department without triggering costly building code compliance measures. In addition to its space limitations, the emergency department is awkwardly located. In 1992, the emergency department was relocated to the front of the hospital and is completely separated from the diagnostic imaging department which remained in the original 1971 building. Consequently, emergency patients are routinely transported across the hospital for imaging and CT scans. Issues Relating to Replacement of Community Hospital Although physically possible, renovating and expanding Community Hospital's existing facility is unreasonable. First, it is cost prohibitive. Any significant renovation to the 1971, 1975, 1977, and 1979 structures would require asbestos abatement prior to construction, at an estimated cost of $1,000,000. In addition, as previously noted, the hospital will be saddled with the major expense of complying with all current building code requirements in the 40-year-old facility. Merely installing showers in patient rooms would immediately trigger a host of expensive, albeit necessary, code requirements involving access, wiring, square footage, fireproofing columns and beams, as well as floor/ceiling and roof/ceiling assemblies. Concurrent with the significant demolition and construction costs, the hospital will experience the incalculable expense and loss of revenue related to closing major portions, if not all, of the hospital. Second, renovation and expansion to the existing facility is an unreasonable option due to its physical restrictions. The 12'4" height of the hospital's first floor limits its ability to accommodate HVAC ductwork large enough to meet current ventilation requirements. In addition, there is inadequate space to expand any department within the confines of the existing hospital without cannibalizing adjacent areas, and vertical expansion is not an option. Community Hospital's application includes a lengthy Facility Condition Assessment which factually details the architectural, mechanical, and electrical deficiencies of the hospital's existing physical plant. The assessment is accurate and reasonable. Community Hospital's Proposed Replacement Community Hospital proposes to construct a six- story, 320 licensed beds, acute care replacement facility. The hospital will consist of 548,995 gross square feet and include a 56-bed adult psychiatric unit connected by a hallway to the first floor of the main hospital building. The proposal also includes the construction of an adjacent medical office building to centralize the outpatient offices and staff physicians. The evidence establishes that the deficiencies inherent in Community Hospital's existing hospital will be cured by its replacement hospital. All patients will be provided large private rooms. The emergency department will double in size, and contain private examination rooms. All building code requirements will be met or exceeded. Patients and staff will have separate elevators from the public. In addition, the surgical department will have large operating rooms, and adequate storage. The MICU and SICU will be adjacent to each other on the second floor to avoid unnecessary traffic within the hospital. Surgical patients will be transported to the ICU via a private elevator dedicated to that purpose. Medical-surgical patient rooms will be efficiently located on the third through sixth floors, in "double-T" configuration. Community Hospital's Existing and Proposed Sites Community Hospital is currently located on a 23-acre site inside the southern boundary of New Port Richey. Single- family homes and offices occupy the two-lane residential streets that surround the site on all sides. The hospital buildings are situated on the northern half of the site, with the main parking lot located to the south, in front of the main entrance to the hospital. Marine Parkway cuts through the southern half of the site from the west, and enters the main parking lot. A private medical mall sits immediately to the west of the main parking lot and a one-acre storm-water retention pond sits to the west of the mall. A private medical office building occupies the south end of the main parking lot and a four-acre drainage easement is located in the southwest corner of the site. Community Hospital's administration has actively analyzed its existing site, aging facility, and adjacent areas. It has commissioned studies by civil engineers, health care consultants, and architects. The collective evidence demonstrates that, although on-site relocation is potentially an option, on balance, it is not a reasonable option. Replacing Community Hospital on its existing site is not practical for several reasons. First, the hospital will experience significant disruption and may be required to completely close down for a period of time. Second, the site's southwestern large four-acre parcel is necessary for storm-water retention and is unavailable for expansion. Third, a reliable cost differential is unknown given Community Hospital's inability to successfully negotiate with the city and owners of the adjacent medical office complexes to acquire additional parcels. Fourth, acquiring other adjacent properties is not a viable option since they consist of individually owned residential lots. In addition to the site's physical restrictions, the site is hindered by its location. The hospital is situated in a neighborhood between small streets and a local school. From the north and south, motorists utilize either U.S. 19, a congested corridor that accommodates approximately 50,000 vehicles per day, or Grand and Madison Streets, two-lane streets within a school zone. From the east and west, motorists utilize similar two-lane neighborhood streets including Marine Parkway, which often floods in heavy rains. Community Hospital's proposed site, on the other hand, is a 53-acre tract positioned five miles from its current facility, at the intersection of two major thoroughfares in southwestern Pasco County. The proposed site offers ample space for all facilities, parking, outpatient care, and future expansion. In addition, Community Hospital's proposed site provides reasonable access to all patients within its existing primary service area made up of zip codes 34652, 34653, 34668, 34655, 34690, and 34691. For example, the average drive times from the population centers of each zip code to the existing site of the hospital and the proposed site are as follows: Zip code Difference Existing site Proposed site 34652 3 minutes 14 minutes 11 minutes 34653 8 minutes 11 minutes 3 minutes 34668 15 minutes 21 minutes 6 minutes 34655 11 minutes 4 minutes -7 minutes 34690 11 minutes 13 minutes 2 minutes 34691 11 minutes 17 minutes 6 minutes While the average drive time from the population centroids of zip codes 34653, 34668, 34690, and 34691 to the proposed site slightly increases, it decreases from the Trinity area, where population growth has been most significant in southwestern Pasco County. In addition, a motorist's average drive time from Community Hospital's existing location to its proposed site is only 10 to 11 minutes, and patients utilizing public transportation will be able to access the new hospital via a bus stop located adjacent to the proposed site. The Condition of North Bay Facility North Bay Hospital is also an aging facility. Its original structure and portions of its physical plant are approximately 30 years old. Portions of its major mechanical systems will soon require replacement including its boilers, air handlers, and chillers. In addition, the hospital is undersized and awkwardly configured. Despite its shortcomings, however, North Bay is generally in good condition. The hospital has been consistently renovated and updated over time and is aesthetically pleasing. Moreover, its second and third floors were added in 1986, are in good shape, and structurally capable of vertical expansion. Medical Surgical Beds and ICU Units By-in-large, North Bay is comprised of undersized, semi-private rooms containing toilet and shower facilities. The hospital does not have any three-bed wards. North Bay's first floor houses all ancillary and support services including lab, radiology, pharmacy, surgery, pre-op, post-anesthesia recovery, central sterile processing and supply, kitchen and cafeteria, housekeeping and administration, as well as the mechanical, electrical, and facilities maintenance and engineering. The first floor also contains a 20-bed CMR unit and a 15-bed acute care unit. North Bay's second and third floors are mostly comprised of semi-private rooms and supporting nursing stations. Although the rooms and stations are not ideally sized, they are in relatively good shape. North Bay utilizes a single ICU with ten critical care beds. The ICU rooms and nursing stations are also undersized. A four-bed ICU ward and former nursery are routinely used to serve overflow patients. Surgery Department and Recovery North Bay utilizes a single pre-operative surgical room for all of its surgery patients. The room accommodates up to five patient beds, but has limited space for storage and pre-operative procedures. Its operating rooms are sufficiently sized. While carts and large equipment are routinely stored in hallways throughout the surgical suite, North Bay has converted the former obstetrics recovery room to surgical storage and has made efficient use of other available space. North Bay operates a small six-bed Post Anesthesia Care Unit. Nurses routinely prepare patient medications in the unit which is often crowded with staff and patients. The Emergency Department North Bay has recently expanded its emergency department. The evidence demonstrates that this department is sufficient and meets current and future expected patient volumes. Replacement Issues Relating to North Bay While it is clear that areas of North Bay's physical plant are aging, the facility is in relatively good condition. It is apparent that North Bay must soon replace significant equipment, including cast-iron sewer pipes, plumbing, boilers, and chillers which will cause some interruption to hospital operations. However, North Bay's four-page written assessment of the facility and its argument citing the need for total replacement is, on balance, not persuasive. North Bay's Proposed Replacement North Bay proposes to construct a new, state-of-the- art, hospital approximately eight miles southeast of its existing facility and intends to offer the identical array of services the hospital currently provides. North Bay's Existing and Proposed Sites North Bay's existing hospital is located on an eight-acre site with limited storm-water drainage capacity. Consequently, much of its parking area is covered by deep, porous, gravel instead of asphalt. North Bay's existing site is generally surrounded by residential properties. While the city has committed, in writing, it willingness to assist both applicants with on-site expansion, it is unknown whether North Bay can acquire additional adjacent property. North Bay's proposed site is located at the intersection of Trinity Oaks Boulevard and Mitchell Boulevard, south of Community Hospital's proposed site, and is quite spacious. It contains sufficient land for the facilities, parking, and future growth, and has all necessary infrastructure in place, including utility systems, storm- water structures, and roadways. Currently however, there is no public transportation service available to North Bay's proposed site. Projected Utilization by Applicants The evidence presented at hearing indicates that, statewide, replacement hospitals often increase a provider's acute care bed utilization. For example, Bartow Memorial Hospital, Heart of Florida Regional Medical Center, Lake City Medical Center, Florida Hospital Heartland Medical Center, South Lake Hospital, and Florida Hospital-Fish Memorial each experienced significant increases in utilization following the opening of their new hospital. The applicants in this case each project an increase in utilization following the construction of their new facility. Specifically, Community Hospital's application projects 82,685 total hospital patient days (64,427 acute care patient days) in year one (2006) of the operation of its proposed replacement facility, and 86,201 total hospital patient days (67,648 acute care patient days) in year two (2007). Using projected 2006 and 2007 population estimates, applying 2002 acute care hospital use rates which are below 50 percent, and keeping Community Hospital's acute care market share constant at its 2002 level, it is reasonably estimated that Community Hospital's existing hospital will experience 52,623 acute care patient days in 2006, and 53,451 acute care patient days in 2007. Consequently, Community Hospital's proposed facility must attain 11,804 additional acute care patient days in 2006, and 14,197 more acute care patient days in 2007, in order to achieve its projected acute care utilization. Although Community Hospital lost eight percent of the acute care market in its service area between 1995 and 2002, two-thirds of that loss was due to residents of Sub- District 5-1 acquiring services in another area. While Community Hospital experienced 78,444 acute care patient days in 1995, it projects only 64,427 acute care patient days in year one. Given the new facility and population factors, it is reasonable that the hospital will recapture half of its lost acute care market share and achieve its projections. With respect to its psychiatric unit, Community Hospital projects 16,615 adult psychiatric inpatient days in year one (2006) and 17,069 adult inpatient days in year two (2007) of the proposed replacement hospital. The evidence indicates that these projections are reasonable. Similarly, North Bay's acute care utilization rate has been consistently below 50 percent. Since 1999, the hospital has experienced declining utilization. In its application, North Bay states that it achieved total actual acute care patient days of 21,925 in 2000 and 19,824 in 2001 and the evidence at hearing indicates that North Bay experienced 17,693 total acute care patient days in 2002. North Bay projects 25,909 acute care patient days in the first year of operation of its proposed replacement hospital, and 27,334 acute care patient days in the second year of operation. Despite each applicant's current facility utilization rate, Community Hospital must increase its current acute care patient days by 20 percent to reach its projected utilization, and North Bay must increase its patient days by at least 50 percent. Given the population trends, service mix and existing competition, the evidence demonstrates that it is not possible for both applicants to simultaneously achieve their projections. In fact, it is strongly noted that the applicants' own projections are predicated upon only one applicant being approved and cannot be supported with the approval of two facilities. Local Health Plan Preferences In its local health plan for District 5, the Suncoast Health Council, Inc., adopted acute care preferences in October, 2000. The replacement of an existing hospital is not specifically addressed by any of the preferences. However, certain acute care preferences and specialty care preferences are applicable. The first applicable preference provides that preference "shall be given to an applicant who proposes to locate a new facility in an area that will improve access for Medicaid and indigent patients." It is clear that the majority of Medicaid and indigent patients live closer to the existing hospitals. However, Community Hospital proposes to move 5.5 miles from its current location, whereas North Bay proposes to move eight miles from its current location. While the short distances alone are less than significant, North Bay's proposed location is further removed from New Port Richey, is not located on a major highway or bus-route, and would therefore be less accessible to the medically indigent residents. Community Hospital's proposed site will be accessible using public transportation. Furthermore, Community Hospital has consistently provided excellent service to the medically indigent and its proposal would better serve that population. In 2000, Community Hospital provided 7.4 percent of its total patient days to Medicaid patients and 0.8 percent of its total patient days to charity patients. Community Hospital provided the highest percentage and greatest number of Medicaid patient days in Sub-District 5-1. By comparison, North Bay provided 5.8 percent of its total patient days to Medicaid patients and 0.9 percent of its total patient days to charity patients. In 2002, North Bay's Medicaid patients days declined to 3.56 percent. Finally, given the closeness and available bed space of the existing providers and the increasing population in the Trinity area, access will be improved by Community Hospital's relocation. The second local health plan preference provides that "[i]n cases where an applicant is a corporation with previously awarded certificates of need, preference shall be given to those which follow through in a timely manner to construct and operate the additional facilities or beds and do not use them for later negotiations with other organizations seeking to enter or expand the number of beds they own or control." Both applicants meet this preference. The third local health plan preference recognizes "Certificate of Need applications that provide AHCA with documentation that they provide, or propose to provide, the largest percentage of Medicaid and charity care patient days in relation to other hospitals in the sub-district." Community Hospital provides the largest percentage of Medicaid and charity care patient days in relation to other hospitals in Sub-District 5-1, and therefore meets this preference. The fourth local health plan preference applies to "Certificate of Need applications that demonstrate intent to serve HIV/AIDS infected persons." Both applicants accept and treat HIV/AIDS infected persons, and would continue to do so in their proposed replacement hospitals. The fifth local health plan preference recognizes "Certificate of Need applications that commit to provide a full array of acute care services including medical-surgical, intensive care, pediatric, and obstetrical services within the sub-district for which they are applying." Community Hospital qualifies since it will continue to provide its current services, including obstetrical care and psychiatric care, in its proposed replacement hospital. North Bay discontinued its pediatric and obstetrical programs in 2001, does not intend to provide them in its proposed replacement hospital, and will not provide psychiatric care. Agency Rule Preferences Florida Administrative Code Rule 59C-1.038(6) provides an applicable preference to a facility proposing "new acute care services and capital expenditures" that has "a documented history of providing services to medically indigent patients or a commitment to do so." As the largest Medicaid provider in Sub-District 5-1, Community Hospital meets this preference better than does North Bay. North Bay's history demonstrates a declining rate of service to the medically indigent. Statutory Review Criteria Section 408.035(1), Florida Statutes: The need for the health care facilities and health services being proposed in relation to the applicable district health plan District 5 includes Pasco and Pinellas County. Pasco County is rapidly developing, whereas Pinellas County is the most densely populated county in Florida. Given the population trends, service mix, and utilization rates of the existing providers, on balance, there is a need for a replacement hospital in the Trinity area. Section 408.035(2), Florida Statutes: The availability, quality of care, accessibility, and extent of utilization of existing health care facilities and health services in the service district of the applicant Community Hospital and North Bay are both located in Sub-District 5-1. Each proposes to relocate to an area of southwestern Pasco County which is experiencing explosive population growth. The other general acute care hospital located in Sub-District 5-1 is Regional Medical Center Bayonet Point, which is located further north, in the Hudson area of western Pasco County. The only other acute care hospitals in Pasco County are East Pasco Medical Center, in Zephyrhills, and Pasco Community Hospital, in Dade City. Those hospitals are located in Sub-District 5-2, east Pasco County, far from the area proposed to be served by either Community Hospital or North Bay. District 5 includes Pinellas County as well as Pasco County. Helen Ellis and Mease are existing hospital providers located in Pinellas County. Helen Ellis has 168 licensed beds, consisting of 150 acute care beds and an 18-bed skilled nursing unit, and is located 7.9 miles from Community Hospital's existing location and 10.8 miles from Community Hospital's proposed location. Access to Helen Ellis for patients originating from southwestern Pasco County requires those patients to travel congested U.S. 19 south to Tarpon Springs. As a result, the average drive time from Community Hospital's existing and proposed site to Helen Ellis is approximately 22 minutes. Helen Ellis is not a reasonable alternative to Community Hospital's proposal. The applicants' proposals are specifically designed for the current and future health care needs of southwestern Pasco County. Given its financial history, it is unknown whether Helen Ellis will be financially capable of providing the necessary care to the residents of southwestern Pasco. Mease Countryside Hospital has 189 licensed acute care beds. It is located 16.0 miles from Community Hospital's existing location and 13.8 miles from Community Hospital's proposed location. The average drive time to Mease Countryside is 32 minutes from Community Hospital's existing site and 24 minutes from its proposed site. In addition, Mease Countryside Hospital has experienced extremely high utilization over the past several years, in excess of 90 percent for calendar years 2000 and 2001. Utilization at Mease Countryside Hospital has remained over 80 percent despite the addition of 45 acute care beds in April 2002. Given the growth and demand, it is unknown whether Mease can accommodate the residents in southwest Pasco County. Mease Dunedin Hospital has 189 licensed beds, consisting of 149 acute care beds, a 30-bed skilled nursing unit, five Level 2 neonatal intensive care beds, and five Level 3 neonatal intensive care beds. Its former 15-bed adult psychiatric unit has been converted into acute care beds. It is transferring its entire obstetrics program at Mease Dunedin Hospital to Mease Countryside Hospital. Mease Dunedin Hospital is located approximately 18 to 20 miles from the applicants' existing and proposed locations with an average drive time of 35-38 minutes. With their remote location, and the exceedingly high utilization at Mease Countryside Hospital, neither of the two Mease hospitals is a viable alternative to the applicants' proposals. In addition, the construction of a replacement hospital would positively impact economic development and further attract medical professionals to Sub-District 5-1. On balance, given the proximity, utilization, service array, and accessibility of the existing providers, including the applicants, the relocation of Community Hospital will enhance access to health care to the residents. Section 408.035(3), Florida Statutes: The ability of the applicant to provide quality of care and the applicant's record of providing quality of care As stipulated, both applicants provide excellent quality of care. However, Community Hospital's proposal will better enhance its ability to provide quality care. Community is currently undersized, non-compliant with today's standards, and located on a site that does not allow for reasonable expansion. Its emergency department is inadequate for patient volume, and the configuration of the first floor leads to inefficiencies in the diagnosis and treatment of emergency patients. Again, most inpatients are placed in semi-private rooms and three-bed wards, with no showers or tubs, little privacy, and an increased risk of infection. The hospital's waiting areas for families of patients are antiquated and undersized, its nursing stations are small and cramped and the operating rooms and storage facilities are undersized. Community Hospital's deficiencies will be effectively eliminated by its proposed replacement hospital. As a result, patients will experience qualitatively better care by the staff who serve them. Conversely, North Bay is in better physical condition and not in need of replacement. It has more reasonable options to expand or relocate its facility on site. Quality of care at North Bay will not be markedly enhanced by the construction of a new hospital. Sections 408.035(4)and(5), Florida Statutes, have been stipulated as not applicable in this case. Section 408.035(6), Florida Statutes: The availability of resources, including health personnel, management personnel, and funds available for capital and operating expenditures, for project accomplishment and operation The parties stipulated that both Community Hospital and North Bay have available health personnel and management personnel for project accomplishment and operation. In addition, the evidence proves that both applicants have sufficient funds for capital and operating expenditures. Community Hospital proposes to rely on its parent company to finance the project. Keith Giger, Vice-President of Finance for HCA, Inc., Community Hospital's parent organization, provided credible deposition testimony that HCA, Inc., will finance 100 percent of the total project cost by an inter-company loan at eight percent interest. Moreover, it is noted that the amount to be financed is actually $20 million less than the $196,849,328 stated in the CON Application, since Community Hospital previously purchased the proposed site in June 2003 with existing funds and does not need to finance the land acquisition. Community Hospital has sufficient working capital for operating expenditures of the proposed replacement hospital. North Bay, on the other hand, proposes to acquire financing from BayCare Obligated Group which includes Morton Plant Hospital Association, Inc.; Mease; and several other hospital entities. Its proposal, while feasible, is less certain since member hospitals must approve the indebtedness, thereby providing Mease with the ability to derail North Bay's proposed bond financing. Section 408.035(7), Florida Statutes: The extent to which the proposed services will enhance access to health care for residents of the service district The evidence proves that either proposal will enhance geographical access to the growing population in the service district. However, with its provision of obstetrical services, Community Hospital is better suited to address the needs of the younger community. With respect to financial access, both proposed relocation sites are slightly farther away from the higher elderly and indigent population centers. Since the evidence demonstrates that it is unreasonable to relocate both facilities away from the down-town area, Community Hospital's proposal, on balance, provides better access to poor patients. First, public transportation will be available to Community Hospital's site. Second, Community Hospital has an excellent record of providing care to the poor and indigent and has accepted the agency's condition to provide ten percent of its total annual patient days to Medicaid recipients To the contrary, North Bay's site will not be accessible by public transportation. In addition, North Bay has a less impressive record of providing care to the poor and indigent. Although AHCA conditioned North Bay's approval upon it providing 9.7 percent of total annual patient days to Medicaid and charity patients, instead of the 9.7 percent of gross annual revenue proposed in its application, North Bay has consistently provided Medicaid and charity patients less than seven percent of its total annual patient days. Section 408.035(8), Florida Statutes: The immediate and long-term financial feasibility of the proposal Immediate financial feasibility refers to the availability of funds to capitalize and operate the proposal. See Memorial Healthcare Group, Ltd. d/b/a Memorial Hospital Jacksonville vs. AHCA et al., Case No. 02-0447 et seq. Community Hospital has acquired reliable financing for the project and has sufficiently demonstrated that its project is immediately financially feasible. North Bay's short-term financial proposal is less secure. As noted, North Bay intends to acquire financing from BayCare Obligated Group. As a member of the group, Mease, the parent company of two hospitals that oppose North Bay's application, must approve the plan. Long-term financial feasibility is the ability of the project to reach a break-even point within a reasonable period of time and at a reasonable achievable point in the future. Big Bend Hospice, Inc. vs. AHCA and Covenant Hospice, Inc., Case No. 02-0455. Although CON pro forma financial schedules typically show profitability within two to three years of operation, it is not a requirement. In fact, in some circumstances, such as the case of a replacement hospital, it may be unrealistic for the proposal to project profitability before the third or fourth year of operation. In this case, Community Hospital's utilization projections, gross and net revenues, and expense figures are reasonable. The evidence reliably demonstrates that its replacement hospital will be profitable by the fourth year of operation. The hospital's financial projections are further supported by credible evidence, including the fact that the hospital experienced financial improvement in 2002 despite its poor physical condition, declining utilization, and lost market share to providers outside of its district. In addition, the development and population trends in the Trinity area support the need for a replacement hospital in the area. Also, Community Hospital has benefited from increases in its Medicaid per diem and renegotiated managed care contracts. North Bay's long-term financial feasibility of its proposal is less certain. In calendar year 2001, North Bay incurred an operating loss of $306,000. In calendar year 2002, it incurred a loss of $1,160,000. In its CON application, however, North Bay projects operating income of $1,538,827 in 2007, yet omitted the ongoing expenses of interest ($1,600,000) and depreciation ($3,000,000) from its existing facility that North Bay intends to continue operating. Since North Bay's proposal does not project beyond year two, it is less certain whether it is financially feasible in the third or fourth year. In addition to the interest and depreciation issues, North Bay's utilization projections are less reasonable than Community Hospital's proposal. While possible, North Bay will have a difficult task achieving its projected 55 percent increase in acute care patient days in its second year of operation given its declining utilization, loss of obstetric/pediatric services and termination of two exclusive managed care contracts. Section 408.035(9), Florida Statutes: The extent to which the proposal will foster competition that promotes quality and cost-effectiveness Both applicants have substantial unused capacity. However, Community Hospital's existing facility is at a distinct competitive disadvantage in the market place. In fact, from 1994 to 1998, Community Hospital's overall market share in its service area declined from 40.3 percent to 35.3 percent. During that same period, Helen Ellis' overall market share in Community Hospital's service area increased from 7.2 percent to 9.2 percent. From 1995 to the 12-month period ending June 30, 2002, Community Hospital's acute care market share in its service area declined from 34.0 percent to 25.9 percent. During that same period, Helen Ellis' acute care market share in Community Hospital's service area increased from 11.7 percent to 12.0 percent. In addition, acute care average occupancy rates at Mease Dunedin Hospital increased each year from 1999 through 2002. Acute care average occupancy at Mease Countryside Hospital exceeded 90 percent in 2000 and 2001, and was approximately 85 percent for the period ending June 30, 2002. Some of the loss in Community Hospital's market share is due to an out-migration of patients from its service area to hospitals in northern Pinellas and Hillsborough Counties. Market share in Community's service area by out-of- market providers increased from 33 percent in 1995 to 40 percent in 2002. Community Hospital's outdated hospital has hampered its ability to compete for patients in its service area. Mease is increasing its efforts to attract patients and currently completing a $92 million expansion of Mease Countryside Hospital. The project includes the development of 1,134 parking spaces on 30 acres of raw land north of the Mease Countryside Hospital campus and the addition of two floors to the hospital. It also involves the relocation of 51 acute care beds, the obstetrics program and the Neonatal Intensive Care Units from Mease Dunedin Hosptial to Mease Countryside Hospital. Mease is also seeking to more than double the size of the Countryside emergency department to handle its 62,000 emergency visits. With the transfer of licensed beds from Mease Dunedin Hospital to Mease Countryside Hospital, Mease will also convert formerly semi-private patient rooms to private rooms at Mease Dunedin Hospital. The approval of Community Hospital's relocated facility will enable it to better compete with the hospitals in the area and promote quality and cost- effectiveness. North Bay, on the other hand, is not operating at a distinct disadvantage, yet is still experiencing declining utilization. North Bay is the only community-owned, not-for- profit provider in western Pasco County and is a valuable asset to the city. Section 408.035(10), Florida Statutes: The costs and methods of the proposed construction, including the costs and methods or energy provision and the availability of alternative, less costly, or more effective methods of construction The parties stipulated that the project costs in both applications are reasonable to construct the replacement hospitals. Community Hospital's proposed construction cost per square foot is $175, and slightly less than North Bay's $178 proposal. The costs and methods of proposed construction for each proposal is reasonable. Given Community Hospital's severe site and facility problems, the evidence demonstrates that there is no reasonable, less costly, or more effective methods of construction available for its proposed replacement hospital. Additional "band-aide" approaches are not financially reasonable and will not enable Community Hospital to effectively compete. The facility is currently licensed for 401 beds, operates approximately 311 beds and is still undersized. The proposed replacement hospital will meet the standards in Florida Administrative Code Rule 59A-3.081, and will meet current building codes, including the Americans with Disabilities Act and the Guidelines for Design and Construction of Hospitals and Health Care Facilities, developed by the American Institute of Architects. The opponents' argue that Community Hospital will not utilize the 320 acute care beds proposed in its CON application, and therefore, a smaller facility is a less- costly alternative. In addition, Helen Ellis' architectural expert witness provided schematic design alternatives for Community Hospital to be expanded and replaced on-site, without providing a detailed and credible cost accounting of the alternatives. Given the evidence and the law, their arguments are not persuasive. While North Bay's replacement cost figures are reasonable, given the aforementioned reasons, including the fact that the facility is in reasonably good condition and can expand vertically, on balance, it is unreasonable for North Bay to construct a replacement facility in the Trinity area. Section 408.035(11), Florida Statutes: The applicant's past and proposed provision of health care services to Medicaid patients and the medically indigent Community Hospital has consistently provided the most health care services to Medicaid patients and the medically indigent in Sub-District 5-1. Community Hospital agreed to provide at least ten percent of its patient days to Medicaid recipients. Similarly, North Bay agreed to provide 9.7 percent of its total annual patient days to Medicaid and charity patients combined. North Bay, by contrast, provided only 3.56 percent of its total patient days to Medicaid patients in 2002, and would have to significantly reverse a declining trend in its Medicaid provision to comply with the imposed condition. Community Hospital better satisfies the criterion. Section 408.035(12) has been stipulated as not applicable in this case. Adverse Impact on Existing Providers Historical figures demonstrate that hospital market shares are not static, but fluctuate with competition. No hospital is entitled to a specific or historic market share free from competition. While the applicants are located in health planning Sub-District 5-1 and Helen Ellis and the two Mease hospitals are located in health planning Sub-District 5- 2, they compete for business. None of the opponents is a disproportionate share, safety net, Medicaid provider. As a result, AHCA gives less consideration to any potential adverse financial impact upon them resulting from the approval of either application as a low priority. The opponents, however, argue that the approval of either replacement hospital would severely affect each of them. While the precise distance from the existing facilities to the relocation sites is relevant, it is clear that neither applicants' proposed site is unreasonably close to any of the existing providers. In fact, Community Hospital intends to locate its replacement facility three miles farther away from Helen Ellis and 1.5 miles farther away from Mease Dunedin Hospital. While Helen Ellis' primary service area is seemingly fluid, as noted by its chief operating officer's hearing and deposition testimony, and the Mease hospitals are located 15 to 20 miles south, they overlap parts of the applicants' primary service areas. Accordingly, each applicant concedes that the proposed increase in their patient volume would be derived from the growing population as well as existing providers. Although it is clear that the existing providers may be more affected by the approval of Community Hosptial's proposal, the exact degree to which they will be adversely impacted by either applicant is unknown. All parties agree, however, that the existing providers will experience less adverse affects by the approval of only one applicant, as opposed to two. Furthermore, Mease concedes that its hospitals will continue to aggressively compete and will remain profitable. In fact, Mease's adverse impact analysis does not show any credible reduction in loss of acute care admissions at Mease Countryside Hospital or Mease Dunedin Hospital until 2010. Even then, the reliable evidence demonstrates that the impact is negligible. Helen Ellis, on the other hand, will likely experience a greater loss of patient volume. To achieve its utilization projections, Community Hospital will aggressively compete for and increase market share in Pinellas County zip code 34689, which borders Pasco County. While that increase does not facially prove that Helen Ellis will be materially affected by Community Hospital's replacement hospital, Helen Ellis will confront targeted competition. To minimize the potential adverse affect, Helen Ellis will aggressively compete to expand its market share in the Pinellas County zip codes south of 34689, which is experiencing population growth. In addition, Helen Ellis is targeting broader service markets, and has filed an application to establish an open- heart surgery program. While Helen Ellis will experience greater competition and financial loss, there is insufficient evidence to conclude that it will experience material financial adverse impact as a result of Community Hospital's proposed relocation. In fact, Helen Ellis' impact analysis is less than reliable. In its contribution-margin analysis, Helen Ellis utilized its actual hospital financial data as filed with AHCA for the fiscal year October 1, 2001, to September 30, 2002. The analysis included total inpatient and total outpatient service revenues found in the filed financial data, including ambulatory services and ancillary services, yet it did not include the expenses incurred in generating ambulatory or ancillary services revenue. As a result, the overstated net revenue per patient day was applied to its speculative lost number of patient days which resulted in an inflated loss of net patient service revenue. Moreover, the evidence indicates that Helen Ellis' analysis incorrectly included operational revenue and excluded expenses related to its 18-bed skilled nursing unit since neither applicant intends to operate a skilled nursing unit. While including the skilled nursing unit revenues, the analysis failed to include the sub-acute inpatient days that produced those revenues, and thereby over inflated the projected total lost net patient service revenue by over one million dollars.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: Community Hospital's CON Application No. 9539, to establish a 376-bed replacement hospital in Pasco County, Sub- District 5-1, be granted; and North Bay's CON Application No. 9538, to establish a 122-bed replacement hospital in Pasco County, Sub-District 5- 1, be denied. DONE AND ENTERED this 19th day of March, 2004, in Tallahassee, Leon County, Florida. S WILLIAM R. PFEIFFER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of March, 2004. COPIES FURNISHED: James C. Hauser, Esquire R. Terry Rigsby, Esquire Metz, Hauser & Husband, P.A. 215 South Monroe Street, Suite 505 Post Office Box 10909 Tallahassee, Florida 32302 Stephen A. Ecenia, Esquire R. David Prescott, Esquire Richard M. Ellis, Esquire Rutledge, Ecenia, Purnell & Hoffman, P.A. 215 South Monroe Street, Suite 420 Post Office Box 551 Tallahassee, Florida 32302-0551 Richard J. Saliba, Esquire Agency for Health Care Administration Fort Knox Building III, Mail Station 3 2727 Mahan Drive Tallahassee, Florida 32308 Robert A. Weiss, Esquire Karen A. Putnal, Esquire Parker, Hudson, Rainer & Dobbs, LLP The Perkins House, Suite 200 118 North Gadsden Street Tallahassee, Florida 32301 Darrell White, Esquire William B. Wiley, Esquire McFarlain & Cassedy, P.A. 305 South Gadsden Street, Suite 600 Tallahassee, Florida 32301 Lealand McCharen, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Valda Clark Christian, General Counsel Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Rhonda M. Medows, M.D., Secretary Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308

Florida Laws (3) 120.569408.035408.039
# 3
HEALTH CARE ADVISORS CORPORATION vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 86-004384 (1986)
Division of Administrative Hearings, Florida Number: 86-004384 Latest Update: Mar. 01, 1988

Findings Of Fact On April 1, 1986, a letter of intent was filed on behalf of Anthony J. Estevez to apply for a CON in the March 16, 1986, batching cycle for a 120-bed long-term psychiatric hospital in Dade County, Florida, HRS Service District XI. A long-term psychiatric hospital is defined in Rule 10-5.011(p), Florida Administrative Code, as a "category of services which provides hospital based inpatient services averaging a length of stay of 90 days." Subsequently, DHRS notified Mr. Estevez that his letter of intent was effective March 17, 1986; the application was to be filed by April 15, 1986; the application was to be completed by June 29, 1986; and the date for final department action was August 28, 1986. On April 15, 1986, Mr. Estevez filed his CON application with DHRS (designated action #4854). Anthony J. Estevez' name appeared along with Health Care Advisors Corporation on the line of the application which requested "legal name of project sponsor." Mr. Francis A. Gomez, Mr. Estevez' authorized representative, had the responsibility for the preparation and submission of the application. Mr. Estevez signed the CON application as the project sponsor. HCAC Psychiatric Hospital of Dade County was meant to be the name of the proposed facility. HCAC is an acronym for Health Care Advisors Corporation, Inc. HCAC was incorporated as of April 14, 1987, but the name had been reserved prior to that time. HCAC was initially intended to be a health care management corporation owned by Mr. Estevez. However, it is now anticipated that Flowers Management Corporation (Flowers) will manage the project under the HCAC corporate umbrella. Mr. Estevez owns 100 percent of the stock of HCAC and is also its sole director and sole shareholder. Mr. Estevez considered HCAC and himself to be one and the same for the purpose of the CON application. HCAC initially proposed to construct in Dade County, Florida, a freestanding 120-bed long-term psychiatric hospital. HCAC proposed to divide those beds into three groups: (1) 75 beds for adults; (2) 30 beds for geriatrics; and (3) 15 beds for adolescents. On May 15, 1986, DHRS requested additional information from HCAC regarding its CON application. On June 19, 1986, and June 23, 1986, HCAC in two separate filings provided DHRS with responses to its request for additional information which DHRS believed was omitted from the original application. The application was deemed complete effective June 29, 1986. On August 20, 1986, Francis Gomez, Paul McCall, a health care consultant employed by HCAC at that time, and HCAC's attorney, met with Islara Soto of DHRS regarding the CON application. At this meeting, HCAC advised DHRS of its intent to orient the facility programmatically to meet the needs of the Hispanic population of Dade and Monroe Counties. By letter dated August 29, 1986, DHRS notified Mr. Francis Gomez of its decision to deny CON application 4584. HCAC requested a formal administrative hearing to contest the denial. At the formal hearing, HCAC indicated a desire to abandon its proposal to provide 15 beds dedicated to serve adolescent patients and sought to introduce evidence relating to a down-sized 105-bed long-term psychiatric hospital serving only adult and geriatric patients. Charter renewed its prehearing motion to exclude any evidence concerning a 105-bed facility. (Approximately three or four weeks prior to the administrative hearing, HCAC had decided to go forward with a proposal for the 105-bed facility.) The undersigned ruled that HCAC would be allowed to present evidence concerning a down-sized 105-bed facility to the extent that such evidence related to a separate and identifiable portion of the original application. HCAC's Proposal The proposed building site for the facility, although not finally selected, is intended to be within the Northwest Dade Center cachement area which is in the northwest corner of Dade County. The ownership of the proposed facility will be by Mr. Estevez and/or his family or wife. The proposed area to be serviced by the facility is Dade and Monroe Counties (HRS Service District XI). HCAC proposes to offer at its facility a psychiatric inpatient unit, patient support services, diagnostic/treatment services, ambulatory care, administrative services, environmental/maintenance, educational and training services, and materials management. The HCAC facility will be managed by Flowers Management Corporation (Flowers), of which Mr. Estevez is a majority shareholder. Flowers was created approximately three and a half years ago for the purpose of providing management in the psychiatric field. Humana Hospital, a hospital chain, has selected Flowers to manage four of its facilities and is also considering Flowers for an additional two facilities. Those facilities are currently providing short-term psychiatric and substance abuse services. Nelson Rodney will be responsible for the design and implementation of the treatment programs in the HCAC facility. Rodney is employed as Regional Vice President of Flowers and is responsible for the management of the Florida hospitals affiliated with Flowers, including a chemical dependency unit at Humana-Biscayne Hospital and a psychiatric unit at Humana West Palm Beach Hospital. The HCAC facility is intended to provide specialty long-term psychiatric services for chronically mentally disturbed individuals requiring a 90-day or greater average length of stay. Many of the patients would be a danger to themselves and others and will require a very restrictive setting -- a locked facility. The programs proposed to be offered involve a range of inpatient diagnostic services, including an intensive diagnostic work-up done prior to admission for all patients. Each patient will have an individualized treatment plan updated every two weeks. The treatment program will include specialized therapy, such as art, music, milieu therapy and special education. There would also be specialized inpatient and outpatient treatment programs for family members and significant others. Discharge planning from the day of admission to assure continuity of care would be another aspect of the program. The proposed HCAC facility would offer a community-like atmosphere. It would provide both open and locked units. Flower's therapeutic model encourages patient participation in daily activities and in the many decisions of what is occurring at the hospital. One component of the project will be an initial screening process by a multi-disciplinary team who will employ a predetermined set of admissions criteria to assist in appropriate levels of care determination. The multi- disciplinary team would consist of a psychiatrist, psychologist, sometimes a neurologist, social worker, a family social assessment person, the patient, and others. The team will attempt to identify and admit only those patients who will have an expected length of stay greater than 90 days. The HCAC facility would provide seminars and workshops to practitioners in the community as well as its own staff. In-service training will also be offered. HCAC proposes to be flexible in the design of its treatment programs and allow new treatments to be utilized. A variety of therapies will be available to provide individualized treatment plans in order to optimize the chance of successful outcome in the patient's treatment. Currently, Flowers affords an in-house program of evaluation. Peer review serves this function in order to assess quality of care rendered to patients in the facility. The HCAC facility proposes to have an Hispanic emphasis. More than 50 percent of the staff will be bilingual. Upper management will consist of individuals who have an acute understanding of Hispanic culture and treatment implications of that culture. The facility will be more flexible in family visitation than is done in many facilities which is an important aspect of the Hispanic culture. The facility as managed by Flowers would have the required "patient's bill of rights" and will also seek JACH accreditation, although these items were not discussed in the application. The HCAC facility would offer each patient an attending psychiatrist who will be part of the multi-disciplinary team that will determine the individualized plan for each patient. Sufficient health manpower including management resources are available to HCAC to operate the project. Additionally, the facility will provide internships, field placements and semester rotations. PROJECT AND CONSTRUCTION COSTS HCAC's CON application, admitted into evidence as Petitioner's Exhibit 4, contains 26 tables concerning various aspects of the 120-bed project as well as Exhibit III.D.1., an operating pro forma. In response to a request for omissions by DHRS, HCAC submitted, among other things, a revised Table 7, revised Table 8, and a revised operating pro forma for the 120-bed project. The items making up HCAC's omission responses were admitted into evidence as Petitioner's Exhibit 5. In conjunction with its desire to complete a 105-bed facility only, HCAC submitted various new tables and a new operating pro forma (forecasted income statement), which were admitted into evidence as Petitioner's Exhibit 6. Table 1 - Source of Funds The estimated total project cost of the 120-bed facility would be $6,469,500. The estimated project cost of the 105-bed facility would be $5,696,940. The financing of the project is contemplated to be done through NCNB bank which has expressed its willingness to finance the project. It is reasonable to assume that HCAC would and could obtain the necessary financing for the proposed facility. Table 2 - Total Debt Table 2 for both the 120-bed project and the 105-bed project shows that 100 percent of the project costs would be financed by debt at an interest rate of 13 percent. The 13 percent interest rate was projected in 1986 and is higher than current rates. It is reasonable to assume that 100 percent of the costs can be financed at 13 percent for either the 120-bed or 105-bed project. Table 3 - New Purchase Equipment HCAC initially projected that $750,000 would be needed to equip the proposed 120-bed facility. The projected expenditure for the 105-bed facility is $500,000. The projected costs of $750,000 and $500,000 for the equipment needed for the 120-bed and 105-bed facility, respectively, are unreasonably low. For example, of the $500,000 projected for equipment costs for the 105-bed project, $80,000 is for mini-vans, $15,000 is for the security system, $40,000 is for a computerized medical records system, and $40,000 for a computerized on-line nurse care program. This would leave $325,000 for all other necessary equipment. Pharmacy, laboratory services and x-ray equipment would be on contract. The remaining $325,000 would be insufficient to equip the kitchen (which would require $80,000), furnish patient rooms (approximately $150,000) and equip the remainder of the 105-bed facility which would reasonably require housekeeping equipment, exam room equipment, chart racks for the nurses station, seclusion room beds, office furniture and equipment, laundry equipment, lockers or shelving, refrigerators, ice makers, day room furniture and lounge furniture. A more reasonable projection for equipment costs would be in the neighborhood of $850,000 to $900,000. Table 7 - Utilization by Class of Pay Tables 7 and 8 of the original application which dealt with utilization by class of pay and effect on patient charges, were revised by HCAC in their responses to DHRS' Omissions Request. Table 7 reflects estimations of the net revenues which HCAC expects to capture from specific payor mixes, namely, contract/indigent, Medicare and insurance/private pay. There is no Medicaid reimbursement available for psychiatric care rendered in a freestanding psychiatric facility. The proposed payor mix for the 120-bed facility is, in patient days, as follows: Year 1 -- Contract/Indigent 8.64 percent (1989) Medicare 26.10 percent Insurance and Private Pay 65.26 percent Year 2 -- Contract/Indigent 8.48 percent (1990) Medicare 26.15 percent Insurance and Private Pay 65.37 percent The proposed payor mix for the 105-bed facility is, in patient days, as follows: Years 1 and 2 - Medicare 3.3 percent Insurance and Private Pay 90.7 percent Indigent 6.0 percent The change in payor mix was not attributed to down-sizing of the facility, but rather was the result of HCAC's additional research and understanding of what the payor mix would most likely be. The change in payor mix does not represent a substantial change to the original application taken as a whole. Francis Gomez, who prepared the Table 7 and was designated as an expert for HCAC in the area of health care facilities management and financial and marketing operations, conceded that HCAC's Table 7 for the 120-bed facility is not reasonable. The Table 7 for the 105-bed facility is also not reasonable. HCAC's contractual allowances are not reasonable. HCAC projects 3.3 percent for Medicare and nothing for HMOs or PPOs. It is unreasonable for HCAC's proposal to make no provision for HMO and PPO type arrangements in view of its projection of 90.7 percent insurance and private pay. Because the proposed patient mix for the 105-bed project is adults and geriatrics, 20 to 25 percent would be a more reasonable Medicare projection. HCAC's projected 90.7 percent insurance and private patient days is unreasonably high in view of the project's intended emphasis of serving the Hispanic population in HRS Service District XI. In 1980, 27.8 percent of the Hispanics in Dade County had incomes less than 150 percent of the poverty level. The 1987 United States Hispanic market study establishes that 20 percent of the Hispanic adults who are heads of households are either retired, students or unemployed. These groups of individuals would not reasonably fit into the insurance and private pay category in most cases. Thus, the 90.7 percent figure for insurance and private pay would have to be reduced significantly. Table 8 - Effects on Patient Charges HCAC's revised Table 8 for the 120-bed facility lists net revenues rather than gross charges for the specific services listed. In year one (1989), the table lists the following projected charges/rates: daily room charge - $214.61; average daily ancillary charge - $25.00; contract/indigent - $125.00; and Medicare - $229.61. In year two (1990), the table lists the following projected charges: daily room charge - $223.19; average daily ancillary charge - $26.00; contract/indigent - $130.00; and Medicare - $238.79. The Table 8 for the 105-bed facility reflects an all-inclusive gross charge of $300 per day in both years (1989 and 1990) for the daily room charge, Medicaid and Medicare. The $300 per day figure would include ancillary charges but not physician fees. The projected patient charges fall within the range of charges currently in effect at psychiatric hospitals in Dade and Monroe Counties and are reasonable for both the 120-bed facility and the 105-bed project. Table 10 - Projected Utilization The financial feasibility of any proposed hospital is largely tied to the ability of the hospital to generate an adequate level of utilization. Absent an adequate level of utilization, a facility will not generate sufficient revenues to meet expenses. Table 10 for both the 120-bed facility and the 105- bed facility sets forth the projected utilization of the proposed facility, by month and year, in patient days, for the first two years of anticipated operation. Table 10 for the 120-bed facility projects the facility will exceed 80 percent occupancy for two of the last three months of the second year and be at 80 percent occupancy at the end of that year. Eighty percent occupancy of 120 beds yields an average daily census of about 96 patients. Table 10 for the 105- bed facility projects that the facility will arrive at 92 percent occupancy at the end of the first year of operation and remain at 95 percent throughout the second year. Ninety-five percent occupancy of the 105-bed facility equals an average daily census of about 99 or 100 patients. The Table 10 "fill-up" rates for both the 120-bed and 105-bed facilities are unreasonable and not practical to be achieved. There is presently an emphasis on providing psychiatric care in less restrictive settings, a trend favoring reduced lengths of stay and a trend in third-party payors to provide reimbursement for a shorter number of days. In addition, nationwide statistics show that only 4 percent of the patients admitted to psychiatric facilities require treatment longer than 90 days. Table 11 - Manpower Requirements For the 120-bed facility, HCAC projected in the Table 11 a staffing ratio of one full-time equivalent (FTE) per occupied bed of 1.625 for the first year of operation and 1.43 for the second year. For the 105-bed facility, HCAC projected in the Table 11 1.91 FTE per occupied bed ratio for the first year and 1.45 for the second year. The actual average of FTEs available for both facilities would be 1.8 to 2.0. The application figures are lower than the actual average because students and other non-paid personnel were not included. Thus, when all programmatic FTEs are included, the number of FTEs per occupied bed is higher than what is listed in the Table 11 for either project. There is a relationship between the number and quality of staff personnel and a facility's ability to provide quality psychiatric care. The industry standard for FTEs is 1.8 to 2.0 FTEs per occupied bed. HCAC's proposed staffing for both the 120-bed and 105-bed projects are reasonable. For both proposed facilities, HCAC projects 110.5 FTEs for the first year with a total annual salary of $1,932,000 which equals an average salary of approximately $17,400 per FTE. HCAC's projected total annual salary expense is unreasonably low. Specifically, the salary for the occupational therapist is too low and the nursing salaries are too low because of shortages. Table 16 - Areas and Square Feet / Table 18 - Space Requirements HCAC proposes a total 59,603 square feet of gross area for the 120-bed facility and a total of 56,050 square feet of gross area for the 105-bed facility. The decrease in size for the 105-bed facility is attributed to a reduction of the ground floor, a reduction of the second floor by removing the adolescent portion and an increase of ancillary services on the second floor for the geriatric population. HCAC projects 168 feet of net living space in the patient's bedroom for both the 120-bed facility and the 105-bed facility. HCAC's proposal of total area and square feet requirements for both the 120-bed and 105-bed facility are reasonable for the delivery of quality psychiatric care within the proposed facilities. There would be adequate land space for parking at HCAC's facility to forego the necessity of constructing a parking garage. Table 19 - Nursing Unit Area Summary HCAC proposes a total of 34,479 square feet of gross area for the nursing unit in the 120-bed facility and the 105-bed facility. The square footage figures under Table 19 for both the 120-bed facility and 105-bed facility are reasonable. Table 25 - Estimated Project Costs Project Advisors Corporation (PAC), of which Mr. Estevez is the Chief Executive Officer, will be responsible for the design and construction of the proposed facility. PAC is a design and construction company which employs a registered architect, several licensed general contractors, an engineer, two graduate architects and a registered graduate architect. The registered architect and basically 90 percent of the staff have previously been involved in the design and construction of health related facilities. HCAC's projected total cost for the 120-bed facility is $6,469,500 and the projected total costs for the 105-bed facility is $5,696,940. HCAC projected construction costs per square foot of $57.55 for the 120-bed facility and $60.00 per square foot for the 105-bed facility. Although the average construction cost of psychiatric facilities today is around $75 to $95 per square foot, HCAC's projected costs are reasonable and reflect reasonable charges given the fact that PAC, the company which would construct the facility, is controlled by Mr. Estevez. The projected costs of land acquisition are also reasonable. HCAC's projected equipment costs are contained in both Table 25 and Table 2. As previously discussed, the projected equipment costs for both projects are unreasonably low. Table 26 - Project Completion Forecast HCAC projects that construction for both the 120-bed facility and 105- bed facility would be completed approximately one year after DHRS' approval of the construction documents. The project completion forecasts for both projects are reasonable. Exhibit III.D.1.- Operating Pro Forma/Forecasted Income Statement Revised Exhibit III.D.1 sets forth the operating pro forma for the first two years of operation of the 120-bed facility (1989 and 1990). HCAC's pro forma for its 120-bed facility is not reasonable. The supplies and other expenses depicted in the pro forma (year one at $55.60 per patient day and year two at $58.10 per patient day) are unreasonably low. A more reasonable estimate would be approximately $100 per patient day. The pro forma for the 120-bed facility does not include any estimate for the Hospital Cost Containment Board (HCCB) tax. Similar facilities in Florida pay an HCCB tax which is composed of one and a half percent of net revenue. Utilizing the more reasonable estimate of $100 per patient day for supplies and other expenses, and including the appropriate HCCB tax, the total supplies and other expenses would increase approximately $1,100,000 and the HCCB tax would be approximately $85,000 in year one. Instead of showing a profit of $395,012, HCAC would potentially lose approximately $785,000 in that year. In year two, the total supplies and other expenses would increase approximately $1,400,000 and the HCCB tax would be approximately $115,000 to $117,000. Thus, in year two, instead of showing a profit of $919,036, HCAC would potentially lose approximately $617, 000. HCAC's "forecasted income statement" for the 105-bed project is also not reasonable. Specifically, the contractual allowances, the allowance for bad debt, and the salaries, wages and fringe benefits are unreasonable. Contractuals include such things as Medicare, Medicaid, HMOs and PPOs, which all generate discounts which are considered contractual allowances. HCAC estimates its bad debt factor at 1.6 percent. A more reasonable projection would be 6 to 8 percent of gross revenue. CONSISTENCY WITH THE DISTRICT XI HEALTH PLAN AND STATE MENTAL HEALTH PLAN The District XI local health council has produced the 1986 District XI Health Plan. The district plan contains the relevant policies, priorities, criteria and standards for evaluation of an application such as HCAC's. HCAC's application is consistent with some of the applicable sections of the District XI Health Plan but inconsistent with the plan taken as a whole. Policy No. 1 of the District XI health plan states that the district should direct its efforts toward a licensed bed capacity of 5.5 non-federal beds per thousand population ratio by 1989. Presently there are 11,294 beds in District XI which represents a number in excess of 5.5 non-federal beds. HCAC's application is inconsistent with this policy. Policy No. 1, Priority No. 1, states that proposals for the construction of new beds in the district should be considered only when the overall average occupancy of licensed beds exceeds 80 percent. Priority No. 1 refers to certain types of beds, specifically, acute care general beds, short- term psychiatric beds and substance abuse beds. HCAC's application is not inconsistent with this priority because long-term psychiatric beds are not mentioned. Policy No. 1, Priority No. 2 favors the encouragement of projects that meet specific district service needs through the conversion of existing beds from currently underutilized services. Because HCAC is not the operator of an existing hospital and it is not possible for HCAC to convert any beds from other services, HCAC's application is inconsistent with Policy No. 1, Priority No. 2. Policy No. 1, Priority No. 3 would only be relevant in the case of an existing hospital but not in the case of a new hospital where no comparative hearing is involved. HCAC's application is not inconsistent with Policy No. 1, Priority No. 3. Policy No. 1, Priority No. 4 allows for priority consideration for the initiation of new services for projects which have had an average occupancy rate of 80 percent for the last two years and which have a documented history of providing services to Medicaid and/or other medically indigent patients. HCAC's application is not entitled to priority consideration under Policy No. 1, Priority No. 4. Policy No. 2 is a broad policy which provides that service alternatives should be available within the district to meet the needs of community residents, while at the same time maintaining an efficient level of utilization. This policy is necessarily tied to the demonstration of overall need for the facility. If HCAC can show need for the proposed facility, its proposal would be consistent with this policy. Policy No. 2, Priority No. 1(f) (Psychiatric Bed Services) provides for priority consideration to be given to specific institutions which have achieved an 80 percent occupancy rate for the preceding year. HCAC's application is not entitled to priority consideration under Policy No. 2, Priority No. 1(f). Policy No. 2, Policy No. 3(f) states that a CON applicant should propose to provide the scope of services consistent with the level of care proposed in the application in accordance with appropriate accrediting agency standards. In the case of psychiatric bed services the appropriate accrediting agency is the Joint Commission for Accreditation of Hospitals (JCAH). Although HCAC neglected to address its ability to comply with JCAH standards in its application, it has established its intent to seek JCAH accreditation. HCAC's proposal is consistent with Policy No. 2, Priority No. 3(f). Policy No. 2, Priority No. 4 gives a preference to those applicants that propose innovative mechanisms such as various complimenting outpatient and inpatient services which are directed toward an ultimate reduction in dependency upon hospital beds. HCAC does not meet this priority because it has not proposed any mechanisms to complement outpatient services with inpatient services directed toward an ultimate reduction in the dependency on hospital beds. Policy No. 2, Priority No. 5 gives a preference to applicants who have based their project on a valid marketing research effort and have placed it in the context of a long-range plan. HCAC does not meet this priority because there was no evidence that the project was based on a valid marketing research plan or placed in the context of a long-range plan. Policy No. 2f Priority No. 6 states that existing facilities as well as applicants for new services should demonstrate a willingness to enter into cooperative planning efforts directed at establishing a system whereby duplication of specialized services is avoided while quality of such services is enhanced. HCAC presented no documentation of transfer agreements with other hospitals and did not substantiate its willingness to enter into cooperative planning efforts with letters of intent, referral agreements or memoranda of understanding. Policy No. 3 provides that services in the community should be made available to all segments of the resident population regardless of the ability to pay. HCAC's proposal is consistent with this policy because a provision for services to indigent patients has been made. Policy No. 3, Priority No. 1 provides that priority should be given to applications proposing services and facilities designed to include Medicaid (Baker Act) patients to the greatest extent possible based on documented history or proposed services. Although Medicaid does not reimburse for freestanding psychiatric services, and Baker Act is only available to short-stay facilities specifically chosen to receive a Baker Act contract, HCAC has not designed its project to include those patients to the greatest extent possible. Thus, HCAC's application is not consistent with Policy No. 3, Priority No. 1. Goal I of the 1986 District XI Goals and Policies for Mental Health and Substance Abuse Services is applicable to HCAC's application. This goal favors mental health services in the least restrictive setting possible. Long- term institutional care may be the least restrictive setting possible in the continuum of mental health care for the treatment of certain more serious types of patients. The concept of "continuum of care" means the full breadth of services available within a community, from least restrictive to most restrictive, from least intensive to most intensive. There must be settings along the full continuum of psychiatric care for patients to receive the level of care they may need. HCAC's application is not inconsistent with Goal I. Issues Relating to CON Recommendations and Priority for Inpatient Psychiatric Services (District XI Health Plan 1986, page 26). In this section of the district health plan, the Planning Advisory Committee states its recommendations and preferences for services for the comprehensive treatment of the mentally ill. The Committee recognizes that long-term hospitalization is a viable form of treatment for some mentally ill patients. However, the Committee expresses a preference for short hospital stays and applicants that project treatment modalities with an average length of stay under 20 days. In addition, the Committee emphasizes a preference for services to be obtained through the conversion of medical/surgical beds, because the district has a large surplus of such beds. Overall, HCAC's project is not consistent with the recommendations and priorities of the Planning Advisory Committee. HCAC's proposal is inconsistent with the goals, objectives and recommendations of the State Health Plan taken as a whole. The State Health Plan contains an important and significant goal that no additional long-term hospital psychiatric beds should be added in the area until the existing and approved beds in the district have achieved an 80 percent occupancy level. The existing long-term hospital psychiatric beds in the district have an occupancy level at approximately 67 percent. AVAILABILITY AND ADEQUACY OF ALTERNATIVES There are available, accessible and appropriate facilities within the service district which can be utilized for the services proposed by HCAC that are presently underutilized. Currently, there are short-term psychiatric providers, a long-term provider, residential facilities, nursing homes and adult congregate living facilities that are available as alternatives in the service district, and in many cases are significantly underutilized. Although the services to be offered by the HCAC facility would be in excess of what is provided in an adult residential treatment facility, nursing home or adult congregate living facility, those facilities could serve as viable alternatives in appropriate cases. In 1986, there were 6,513 existing nursing home beds in District XI and an additional 1,928 approved for opening. There are 24 adult congregate living facilities in District XI with 50 beds or more. The total number of beds for ACLFs in 1986 was 2,620. In addition, Grant Center Hospital has 140 existing and 20 approved long-term psychiatric beds; its occupancy rate is low. THE ABILITY OF THE APPLICANT TO PROVIDE QUALITY OF CARE AND THE APPLICANT'S RECORD OF PROVIDING QUALITY OF CARE The "Flowers Model," made a part of the application, is a description of how, from a clinical perspective, the proposal will be managed. Although Flowers does not presently operate any long-term psychiatric facilities, the Flowers Model is appropriate for a long-term psychiatric care facility. From a clinical and programmatic perspective, the HCAC facility would provide good quality of care. PROBABLE ECONOMIES AND IMPROVEMENTS IN SERVICE WHICH MAY BE DERIVED FROM OPERATION OF JOINT, COOPERATIVE OR SHARED HEALTH CARE RESOURCES HCAC has not demonstrated that there will be any improvements in service which may be derived from operation of joint, cooperative or shared health care resources. The Northwest Dade County proposed location of the HCAC facility would place the project within two hours travel of 90 percent or more of District XI population. Nevertheless, HCAC's facility would increase the number of people who would be within two hours of long-term adult psychiatric facilities by less than 1 percent. The patients in District XI will not experience serious problems in obtaining inpatient care of the type proposed in the absence of the service proposed by HCAC. There is presently adequate and accessible long-term hospital inpatient services for District XI population based on the existing and approved facilities in District X (Southwinds Hospital, Florida Medical Center) and District XI (Grant Center). There are two approved but not yet open long-term psychiatric facilities in District X, Broward County. Florida Medical Center holds a CON for 60 long-term adult psychiatric beds to be located in Lauderdale Lakes and Southwinds Hospital holds a 75-bed CON with 60 beds counted for long-term treatment of adult and geriatric patients to be located in Andy Town. In addition, there are 238 long-term state hospital beds at South Florida State Hospital in Broward County. Although the need for long-term psychiatric beds is assessed on a district-wide basis, it is reasonable to consider psychiatric beds in Broward County (District X) as an alternative to HCAC's proposal because they are within two hours access of individuals within the two counties. Likewise, it is reasonable to consider approved beds because need is projected for a future date. Not counting approved beds would overestimate need and result in duplication of services. FINANCIAL FEASIBILITY HCAC has not demonstrated that the 120-bed project or the 105-bed facility is financially feasible in the short or the long term. The projection of revenues and expenses in the pro forma (120-bed project) and the forecasted income statement (105-bed project) were flawed to such an extent that financial feasibility of the project was not shown. IMPACT ON COSTS AND COMPETITION If HCAC's project were to be built, a likely result is increased charges for the provision of services in the area. HCAC's proposed facility would negatively impact the availability of psychiatric nurses. There is a shortage of psychiatric nurses in Dade County and it is difficult to recruit and hire R.N.s with psychiatric experience. In order to hire nurses in a time of shortage, hospitals must recruit staff from other facilities. Shortages can increase the cost of recruitment and the cost of salaries. Charter is a hospital located in District XI and consists of 88 beds, 80 of which are licensed as short-term psychiatric beds and eight of which are licensed as short-term substance abuse beds. Short-term psychiatric inpatient care is defined in Rule 10-5.011(1)(o), Florida Administrative Code, as "a service not exceeding three months and averaging a length of stay of 30 days or less for adults." HCAC's proposed facility, if approved, would have a negative economic impact on Charter. It is very likely that many of the patients at the proposed HCAC facility would experience lengths of stay between 45 and 60 days. Charter treats a significant number of patients (approximately 15 percent) who stay longer than 30 days. Because of the difficulty of initially identifying patients who would require either short or long-term stays, many of Charter's patients could be lost to the HCAC project. Charter could suffer a loss of up to 657 patient days per year if HCAC's proposed facility is approved. This loss of patients would impair Charter's ability to have certain types of programs, equipment and staff. PROVISION OF HEALTH CARE SERVICES TO MEDICAID PATIENTS AND THE MEDICALLY INDIGENT HCAC's project does not propose a significant amount of indigent care and HCAC has no history of providing health care services to Medicaid patients and the medically indigent. OCCUPANCY RATE FOR EXISTING LONG-TERM HOSPITAL PSYCHIATRIC BEDS Grant Center Hospital is the only existing long-term psychiatric facility in District XI. It has 140 beds and specializes in treating children and adolescent patients. Its occupancy rate at the time of review for the preceding year was approximately 67 percent. The appropriate period to calculate occupancy rate of existing facilities in this case is July 1985 to July 1986 because this is the most recent 12-month period preceding application decision. The occupancy rate of all psychiatric beds within District XI was below 80 percent. HCAC'S PROPOSED NEED METHODOLOGY At the hearing, W. Eugene Nelson testified on behalf of HCAC on the need for the proposed long-term adult psychiatric beds. Mr. Nelson was accepted as an expert in the field of health care planning, including psychiatric bed need assessment. Mr. Nelson performed his analysis in District XI using the Graduate Medical Educational National Advisory Committee (GMENAC) methodology. The need methodology proposed by HCAC is inappropriate to adequately and accurately predict need for long-term adult psychiatric beds in District XI. The GMENAC study is a national study based on national data developed to determine physician requirements in 1990 for 23 medical specialities. GMENAC estimates the prevalence of certain psychiatric disorders among the general population and estimates the number of those persons who need care for their conditions in differing treatment settings ranging from outpatient services to 24-hour institutional care. HCAC's methodology, utilizing the GMENAC study, predicted a gross need of 895 beds in District XI in the applicable horizon (July 1991). The total number of existing long-term psychiatric beds in the entire State of Florida is only 836 beds, and the majority of those beds are experiencing occupancy levels under 65 percent. Many of these long-term facilities have been around for a period of at least three years and are still experiencing low occupancy. Therefore, the low levels are probably not based on the fact that the facilities are in a start-up mode. HCAC's bed need computation is as follows: Adult Long Term Psychiatric Bed Requirements (Excludes Alcohol, Drug Abuse, Mental Retardation, Organic Brain Syndrome and "other" Conditions) District XI: July 1991 Condition Admission Rate Schizophrenia & Other Psychoses 99 Affective Disorder Psychosis 20 Affective Disorder Neuroses 60 Neuroses and Personality Disorders 199 20 Projected 1991 Population Age 18+ 1,459,437 Total Projected Admissions 2,904 Average Length of Stay 90 Projected Patient Days Target Occupancy 80.00 261,385 percent Total Beds Required 895 Beds Currently Available 438 South Florida State Hospital (450 X .48) Residential Treatment Facilities 216 233 Net Beds Needed 496 The projected 1991 population for District XI for age 18 and above is 1,459,473. The population projections were received from the Office of the Governor. The anticipated admissions per 100,000 is calculated to be 199 for the conditions listed. The total projected admissions for 1991 is 2,904. The 2,904 projected long-term care admissions when multiplied by the average length of stay of 90 days generates 261,385 projected patient days in the 1991 horizon period in District XI. The 261,385 patient days is then divided by 365 days in the year, and then by 80 percent, the latter of which is contained in the rule as the optimum or desired occupancy for long-term psychiatric beds. This yields a total gross long-term psychiatric bed requirement for adults and geriatrics of 895 beds. In performing his analysis, Mr. Nelson used Table 4, page 22 of the GMENAC Study which lists information for mental disorders requiring care by treatment setting. The prevalence rate of 199 admissions per 100,000 population was based on the study's projection of the mental disorders listed requiring a "24-hour" treatment setting. Nelson used a projected 90-day length of stay in his computations. There is nothing in the GMENAC document that sets forth the average length of stay of persons reflected in the 24-hour column. Therefore, it is misleading to assume that persons admitted subject to the 199 per 100,000 admissions rate will actually experience an average length of stay as long as 90 days. For HCAC's admission rate to be valid, all of the facilities in District XI would have to average a 90-day length of stay. This is an unreasonable assumption. Nationwide, only a small percentage of all psychiatric admissions experience a length of stay as long as 90 days. In computing beds currently available in District XI, Mr. Nelson did not consider nursing home beds, adult congregate living facility beds, or the 135 long-term psychiatric beds that have been approved for two facilities in District X (Broward County). Nelson also did not consider whether short-term facilities were capable or willing to take additional patients for long-term treatment. Thus, the computation of beds currently available in the HCAC methodology is unreasonably low. HCAC's need methodology generated a long-term psychiatric bed to population ratio of .61 per thousand. DHRS' rule for short-term psychiatric beds was a population ratio of .35 per thousand. Short-term care facilities have admission rates two to three times greater than long-term facilities and nationwide statistics establish that only 4 percent of all psychiatric patients stay longer than 90 days. It is not reasonable for the bed rate for long-term adult psychiatric beds to be higher than the rate for short-term psychiatric beds. Mr. Nelson excluded organic brain syndrome diagnosis from his analysis and admission rate based on an assumption that many of those patients are in nursing homes. Nelson did not use nursing home beds in computing his need methodology because he believed that eliminating the organic brain syndrome category from the Table 4, page 22, 24-hour column in the GMENAC study eliminates the need for considering nursing home beds in the inventory. For that approach to be valid, the number of organic brain syndrome patients that go to long-term psychiatric facilities would need to cancel out the number of patients in other diagnostic categories who go to nursing homes. Nelson did not consult or review any data concerning the number or percentage rates of schizophrenics and other mentally ill patients in nursing homes or the number of organic brain syndrome people being treated in long-term psychiatric facilities. In addition, Nelson did not know what percentage, if any, of the GMENAC projected admissions were nursing home admissions. In computing existing beds, Nelson listed two types of facilities previously existing in District XI which were applicable to his methodology: the state hospital (216 beds) and residential treatment facilities (233 beds). The correct number of beds available for adults from District XI in the state hospital is 238. The actual number of beds for residential facilities is 335. Dr. Howard Fagin testified as an expert in health planning and feasibility analysis, including psychiatric bed need assessment and feasibility. In Dr. Fagin's opinion, Nelson's bed need methodology is incorrect and the conclusions drawn are wrong because Nelson used an inappropriate length of stay based on the GMENAC study and also incorrectly identified the applicable beds which should be considered for comparable facilities under the GMENAC study and, therefore, his total numbers in terms of gross and net beds needed are incorrect. Dr. Fagin's critique of Mr. Nelson's bed need methodology is persuasive and credible. HCAC has failed to show that its proposed need methodology could accurately project the need for long-term psychiatric beds in District XI.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that CON Application No. 4854 by Health Care Advisors Corporation, Inc. be DENIED. DONE and ORDERED this 1st day of March, 1988 in Tallahassee, Leon County, Florida. W. MATTHEW STEVENSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of March, 1988. COPIES FURNISHED: Lesley Mendelson, Esquire Assistant General Counsel Department of Health and Rehabilitative Services Fort Knox Executive Center 2727 Mahan Drive, Suite 308 Tallahassee, Florida 32308 H. Darrell White, Esquire Gerald B. Sternstein, Esquire Post Office Box 2174 Tallahassee, Florida 32302 William E. Hoffman, Esquire 2500 Trust Company Tower 25 Park Place Atlanta, Georgia 30303 George N. Neros, Jr., Esquire 101 North Monroe Street Monroe-Park Tower Suite 900 Tallahassee, Florida 32301 Donna H. Stinson, Esquire The Perkins House Suite 100 118 North Gadsden Street Tallahassee, Florida 32301 R. S. Power, Esquire Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Room 407 Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (1) 120.57
# 4
VENCOR HOSPITALS SOUTH, INC. vs AGENCY FOR HEALTH CARE ADMINISTRATION, 97-001181CON (1997)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Mar. 12, 1997 Number: 97-001181CON Latest Update: Dec. 08, 1998

The Issue Whether Certificate of Need Application No. 8614, filed by Vencor Hospitals South, Inc., meets, on balance, the applicable statutory and rule criteria. Whether the Agency for Health Care Administration relied upon an unpromulgated and invalid rule in preliminarily denying CON Application No. 8614.

Findings Of Fact Vencor Hospital South, Inc. (Vencor), is the applicant for certificate of need (CON) No. 8614 to establish a 60-bed long term care hospital in Fort Myers, Lee County, Florida. The Agency for Health Care Administration (AHCA), the state agency authorized to administer the CON program in Florida, preliminarily denied Vencor's CON application. On January 10, 1997, AHCA issued its decision in the form of a State Agency Action Report (SAAR) indicating, as it also did in its Proposed Recommended Order, that the Vencor application was denied primarily due to a lack of need for a long term care hospital in District 8, which includes Lee County. Vencor is a wholly-owned subsidiary of Vencor, Inc., a publicly traded corporation, founded in 1985 by a respiratory/physical therapist to provide care to catastrophically ill, ventilator-dependent patients. Initially, the corporation served patients in acute care hospitals, but subsequently purchased and converted free-standing facilities. In 1995, Vencor merged with Hillhaven, which operated 311 nursing homes. Currently, Vencor, its parent, and related corporations operate 60 long term care hospitals, 311 nursing homes, and 40 assisted living facilities in approximately 46 states. In Florida, Vencor operates five long term care hospitals, located in Tampa, St. Petersburg, North Florida (Green Cove Springs), Coral Gables, and Fort Lauderdale. Pursuant to the Joint Prehearing Stipulation, filed on October 2, 1997, the parties agreed that: On August 26, 1996, Vencor submitted to AHCA a letter of intent to file a Certificate of Need Application seeking approval for the construction of a 60-bed long term care hospital to be located in Fort Myers, AHCA Health Planning District 8; Vencor's letter of intent and board resolution meet requirements of Sections 408.037(4) and 408.039(2)(c), Florida Statutes, and Rule 59C-1.008(1), Florida Administrative Code, and were timely filed with both AHCA and the local health council, and notice was properly published; Vencor submitted to AHCA its initial Certificate of Need Application (CON Action No. 8614) for the proposed project on September 25, 1996, and submitted its Omissions Response on November 11, 1996; Vencor's Certificate of Need Application contains all of the minimum content items required in Section 408.037, Florida Statutes; Both Vencor's initial CON Application and its Omissions Response were timely filed with AHCA and the local health council. During the hearing, the parties also stipulated that Vencor's Schedule 2 is complete and accurate. In 1994, AHCA adopted rules defining long term care and long term care hospitals. Rule 59C-1.002(29), Florida Administrative Code, provides that: "Long term care hospital" means a hospital licensed under Chapter 395, Part 1, F.S., which meets the requirements of Part 412, Subpart B, paragraph 412.23(e), [C]ode of Federal Regulations (1994), and seeks exclusion from the Medicare prospective payment system for inpatient hospital services. Other rules distinguishing long term care include those related to conversions of beds and facilities from one type of health care to another. AHCA, the parties stipulated, has no rule establishing a uniform numeric need methodology for long term care beds and, therefore, no fixed need pool applicable to the review of Vencor's CON application. Numeric Need In the absence of any AHCA methodology or need publication, Vencor is required to devise its own methodology to demonstrate need. Rule 59C-1.008(e) provides in pertinent part: If no agency policy exists, the applicant will be responsible for demonstrating need through a needs assessment methodology which must include, at a minimum, consideration of the following topics, except where they are inconsistent with the applicable statutory or rule criteria: Population demographics and dynamics; Availability, utilization and quality of like services in the district, subdistrict, or both; Medical treatment trends; and Market conditions. Vencor used a numeric need analysis which is identical to that prepared by the same health planner, in 1995, for St. Petersburg Health Care Management, Inc. (St. Petersburg). The St. Petersburg project proposed that Vencor would manage the facility. Unlike the current proposal for new construction, St. Petersburg was a conversion of an existing but closed facility. AHCA accepted that analysis and issued CON 8213 to St. Petersburg. The methodology constitutes a use rate analysis, which calculates the use rate of a health service among the general population and applies that to the projected future population of the district. The use rate analysis is the methodology adopted in most of AHCA's numeric need rules. W. Eugene Nelson, the consultant health planner for Vencor, derived a historic utilization rate from the four districts in Florida in which Vencor operates long term care hospitals. That rate, 19.7 patient days per 1000 population, when applied to the projected population of District 8 in the year 2000, yields an average daily census of 64 patients. Mr. Nelson also compared the demographics of the seven counties of District 8 to the rest of the state, noting in particular the sizable, coastal population centers and the significant concentration of elderly, the population group which is disproportionately served in long term care hospitals. The proposed service area is all of District 8. By demonstrating the numeric need for 64 beds and the absence of any existing long term care beds in District 8, Vencor established the numeric need for its proposed 60-bed long term care hospital. See Final Order in DOAH Case No. 97-4419RU. Statutory Review Criteria Additional criteria for evaluating CON applications are listed in Subsections 408.035(1) and (2), Florida Statutes, and the rules which implement that statute. (1)(a) need in relation to state and district health plans. The 1993 State Health Plan, which predates the establishment of long term care rules, contains no specific preferences for evaluating CON applications for long term care hospitals. The applicable local plan is the District 8 1996-1997 Certificate of Need Allocation Factors Report, approved on September 9, 1996. The District 8 plan, like the State Health Plan, contains no mention of long term care hospitals. In the SAAR, AHCA applied the District 8 and state health plan criteria for acute care hospital beds to the review of Vencor's application for long term care beds, although agency rules define the two as different. The acute care hospital criteria are inapplicable to the review of this application for CON 8614 and, therefore, there are no applicable state or district health plan criteria for long term care. (1)(b) availability, quality of care, efficiency, appropriateness, accessibility, extent of utilization and adequacy of like and existing services in the district; and (1)(d) availability and adequacy of alternative health care facilities in the district. Currently, there are no long term care hospitals in District 8. The closest long term care hospitals are in Tampa, St. Petersburg, and Fort Lauderdale, all over 100 miles from Fort Myers. In the SAAR, approving the St. Petersburg facility, two long term care hospitals in Tampa were discussed as alternatives. By contract, the SAAR preliminarily denying Vencor's application lists as alternatives CMR facilities, nursing homes which accept Medicare patients, and hospital based skilled nursing units. AHCA examined the quantity of beds available in other health care categories in reliance on certain findings in the publication titled Subacute Care: Policy Synthesis And Market Area Analysis, a report submitted to the Department of Health and Human Services, Office of the Assistant Secretary for Planning and Evaluation, on November 1, 1995, by Levin-VHI, Inc. ("the Lewin Report"). The Lewin Report notes the similarities between the type of care provided in long term care, CMR and acute care hospitals, and in hospital-based subacute care units, and subacute care beds in community nursing homes. The Lewin Report also acknowledges that "subacute care" is not well-defined. AHCA has not adopted the Lewin Report by rule, nor has it repealed its rules defining long term care as a separate and district health care category. For the reasons set forth in the Final Order issued simultaneously with this Recommended Order, AHCA may not rely on the Lewin Report to create a presumption that other categories are "like and existing" alternatives to long term care, or to consider services outside District 8 as available alternatives. Additionally, Vencor presented substantial evidence to distinguish its patients from those served in other types of beds. The narrow range of diagnostic related groups or DRGs served at Vencor includes patients with more medically complex multiple system failures than those in CMR beds. With an average length of stay of 60 beds, Vencor's patients are typically too sick to withstand three hours of therapy a day, which AHCA acknowledged as the federal criteria for CMR admissions. Vencor also distinguished its patients, who require 7 1/2 to 8 hours of nursing care a day, as compared to 2 1/2 to 3 hours a day in nursing homes. Similarly, the average length of stay in nursing home subacute units is less than 41 days. The DRG classifications which account for 80 percent of Vencor's admissions represent only 7 percent of admissions to hospital based skilled nursing units, and 10 to 11 percent of admissions to nursing home subacute care units. Vencor also presented the uncontroverted testimony of Katherine Nixon, a clinical case manager whose duties include discharge planning for open heart surgery for patients at Columbia-Southwest Regional Medical Center (Columbia-Southwest), an acute care hospital in Fort Myers. Ms. Nixon's experience is that 80 percent of open heart surgery patients are discharged home, while 20 percent require additional inpatient care. Although Columbia-Southwest has a twenty-bed skilled nursing unit with two beds for ventilator-dependent patients, those beds are limited to patients expected to be weaned within a week. Finally, Vencor presented results which are preliminary and subject to peer review from its APACHE (Acute Physiology, Age, and Chronic Health Evaluation) Study. Ultimately, Vencor expects the study to more clearly distinguish its patient population. In summary, Vencor demonstrated that a substantial majority of patients it proposes to serve are not served in alternative facilities, including CMR hospitals, hospital-based skilled nursing units, or subacute units in community nursing homes. Expert medical testimony established the inappropriateness of keeping patients who require long term care in intensive or other acute care beds, although that occurs in District 8 when patients refuse to agree to admissions too distant from their homes. (1)(c) ability and record of providing quality of care. The parties stipulated that Vencor's application complies with the requirement of Subsection 408.035(1)(c). (1)(e) probable economics of joint or shared resources; (1)(g) need for research and educational facilities; and (1)(j) needs of health maintenance organizations. The parties stipulated that the review criteria in Subsection 408.035(1)(e), (g) and (j) are not at issue. (f) need in the district for special equipment and services not reasonably and economically accessible in adjoining areas. Based on the experiences of Katherine Nixon, it is not reasonable for long term care patients to access services outside District 8. Ms. Nixon also testified that patients are financially at a disadvantage if placed in a hospital skilled nursing unit rather than a long term care hospital. If a patient is not weaned as quickly as expected, Medicare reimbursement after twenty days decreases to 80 percent. In addition, the days in the hospital skilled nursing unit are included in the 100 day Medicare limit for post-acute hospitalization rehabilitation. By contrast, long term care hospitalization preserves the patient's ability under Medicare to have further rehabilitation services if needed after a subsequent transfer to a nursing home. (h) resources and funds, including personnel to accomplish project. Prior to the hearing, the parties stipulated that Vencor has sufficient funds to accomplish the project, and properly documented its source of funds in Schedule 3 of the CON application. Vencor has a commitment for $10 million to fund this project of approximately $8.5 million. At the hearing, AHCA also agreed with Vencor that the staffing and salary schedule, Schedule 6, is reasonable. (i) immediate and long term financial feasibility of the proposal. Vencor has the resources to establish the project and to fund short term operating losses. Vencor also reasonably projected that revenues will exceed expenses in the second year of operation. Therefore, Vencor demonstrated the short and long term financial feasibility of its proposal. needs of entities serving residents outside the district. Vencor is not proposing that any substantial portion of it services will benefit anyone outside District 8. probable impact on costs of providing health services; effects of competition. There is no evidence of an adverse impact on health care costs. There is preliminary data from the APACHE study which tends to indicate the long term care costs are lower than acute care costs. No adverse effects of competition are shown and AHCA did not dispute the fact that Vencor's proposal is supported by acute care hospitals in District 8. costs and methods of proposed construction; and (2)((a)-(c) less costly alternatives to proposed capital expenditure. The prehearing stipulation includes agreement that the design is reasonable, and that proposed construction costs are below the median in that area. past and proposed service to Medicaid patients and the medically indigent. Vencor has a history of providing Medicaid and indigent care in the absence of any legal requirements to do so. The conditions proposed of 3 percent of total patient days Medicaid and 2 percent for indigent/charity patients proposed by Vencor are identical to those AHCA accepted in issuing CON 8213 to St. Petersburg Health Care Management, Inc. Vencor's proposed commitment is reasonable and appropriate, considering AHCA's past acceptance and the fact that the vast majority of long term care patients are older and covered by Medicare. services which promote a continuum of care in a multilevel health care system. While Vencor's services are needed due to a gap in the continuum of care which exists in the district, it has not shown that it will be a part of a multilevel system in District 8. (2)(d) that patients will experience serious problems obtaining the inpatient care proposed. Patients experience and will continue to experience serious problems in obtaining long term care in District 8 in the absence of the project proposed by Vencor. Based on the overwhelming evidence of need, and the ability of the applicant to establish and operate a high quality program with no adverse impacts on other health care providers, Vencor meets the criteria for issuance of CON 8614.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Agency for Health Care Administration issue CON 8614 to Vencor Hospitals South, Inc., to construct a 60-bed long term care hospital in Fort Myers, Lee County, District 8. DONE AND ENTERED this 3rd day of March, 1998, in Tallahassee, Leon County, Florida. ELEANOR M. HUNTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of March, 1998. COPIES FURNISHED: Sam Power, Agency Clerk Agency for Health Care Administration Fort Knox Building 3 2727 Mahan Drive, Suite 3431 Tallahassee, Florida 32308-5403 Paul J. Martin, General Counsel Agency for Health Care Administration Fort Knox Building 3 2727 Mahan Drive, Suite 3431 Tallahassee, Florida 32308-5403 Kim A. Kellum, Esquire Agency for Health Care Administration Fort Knox Building 3 2727 Mahan Drive, Suite 3431 Tallahassee, Florida 32308-5403 R. Terry Rigsby, Esquire Geoffrey D. Smith, Esquire Blank, Rigsby & Meenan, P.A. 204 South Monroe Street Tallahassee, Florida 32301

Florida Laws (5) 120.56120.57408.035408.037408.039 Florida Administrative Code (2) 59C-1.00259C-1.008
# 5
CHARTER WOODS HOSPITAL, INC. vs. UNITED MEDICAL CORPORATION, D/B/A BAY COUNTY PSYCHIATRIC, 84-003114 (1984)
Division of Administrative Hearings, Florida Number: 84-003114 Latest Update: Oct. 26, 1984

The Issue Whether an out-of-state corporation doing business as a psychiatric hospital located out of state and as a counseling servico located in Florida's District I is entitled to formal administrative proceedings on an application for certificate of need filed by another party seeking a certificate of need to construct an 80-bed long-term psychiatric hospital in District I? For present purposes Bay Psychiatric's well-pleaded, factual allegations in its petition for formal hearing are assumed to be true. The petition alleges essentially the following ASSUMED FACTS Bay Psychiatric proposes to build an 80-bed long-term psychiatric hospital in Bay County, Florida, and HRS proposes to grant it certificate of need No. 3204 authorizing it to do so. The proposed hospital's primary service area is to be HRS Districts l and 2. Petitioner operates a free standing psychiatric hospital in Dothan, Alabama, which "includes beds defined as long-term psychiatric beds by Rule 10- 5.11(26), Florida Administrative Code, and beds defined as short-term psychiatric beds by Rule 10-5.11(25), Florida Administrative Code." Approximately one quarter of the Dothan hospital's patients come across the state line from HRS Districts l and 2. Last year the Dothan hospital experienced less than an 80 percent occupancy rate of its long-term beds, less than a 75 percent occupancy rate of its adult short-term beds, and less than a 70 percent occupancy rate of its other short-term beds. If Bay Psychiatric receives a certificate of need, the Dothan hospital "will be substantially and adversely affected because any patients admitted to the proposed UNITED MEDICAL facility would otherwise likely have been admitted to CHARTER WOODS HOSPITAL. Petitioner also operates a "counseling and intervention facility located in Panama City, Florida, "offering various outpatient services which "at least in part" are the types of outpatient services Bay Psychiatric would offer at its proposed hospital. Because of "a finite patient population" petitioner's counseling facility would also be "substantially and adversely affected " if Bay Psychiatric receives a certificate of need.

Recommendation It is, accordingly, RECOMMENDED: That the Department of Health and Rehabilitative dismiss the petition for formal proceeding. DONE AND ENTERED this 26th day of October, 1984, at Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of October, 1984. COPIES FURNISHED: Douglas L. Mannheimer, Esquire 318 North Calhoun Street Post Office Drawer 11300 Tallahassee, Florida 32302-3300 William E. Hoffman, Jr. James A. Dyer Bondurant Miller Hishon and Stephenson 2200 First Atlanta Tower Two Peachtree Street, N.W. Atlanta, Georgia 30383 F. Philip Blank, Esquire 241 East Virginia Street Tallahassee, Florida 32301 Chris H. Bentley, Esquire Fuller & Johnson, P.A. 300 East Park Avenue Post Office Box 1739 Tallahassee, Florida 32302 David Pingree, Secretary Department of Health and Rehabilitative Services 1323 Winuwood Boulevard Tallahassee, Florida 32301

# 6
SOUTH BROWARD HOSPITAL DISTRICT, D/B/A MEMORIAL REGIONAL HOSPITAL vs AGENCY FOR HEALTH CARE ADMINISTRATION, 12-000424CON (2012)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 27, 2012 Number: 12-000424CON Latest Update: Mar. 14, 2012

Conclusions THIS CAUSE comes before the Agency For Health Care Administration (the "Agency") concerning Certificate of Need ("CON") Application No. 10131 filed by The Shores Behavioral Hospital, LLC (hereinafter “The Shores”) to establish a 60-bed adult psychiatric hospital and CON Application No. 10132 The entity is a limited liability company according to the Division of Corporations. Filed March 14, 2012 2:40 PM Division of Administrative Hearings to establish a 12-bed substance abuse program in addition to the 60 adult psychiatric beds pursuant to CON application No. 10131. The Agency preliminarily approved CON Application No. 10131 and preliminarily denied CON Application No. 10132. South Broward Hospital District d/b/a Memorial Regional Hospital (hereinafter “Memorial”) thereafter filed a Petition for Formal Administrative Hearing challenging the Agency’s preliminary approval of CON 10131, which the Agency Clerk forwarded to the Division of Administrative Hearings (“DOAH”). The Shores thereafter filed a Petition for Formal Administrative Hearing to challenge the Agency’s preliminary denial of CON 10132, which the Agency Clerk forwarded to the Division of Administrative Hearings (‘DOAH”). Upon receipt at DOAH, Memorial, CON 10131, was assigned DOAH Case No. 12-0424CON and The Shores, CON 10132, was assigned DOAH Case No. 12-0427CON. On February 16, 2012, the Administrative Law Judge issued an Order of Consolidation consolidating both cases. On February 24, 2012, the Administrative Law Judge issued an Order Closing File and Relinquishing Jurisdiction based on _ the _ parties’ representation they had reached a settlement. . The parties have entered into the attached Settlement Agreement (Exhibit 1). It is therefore ORDERED: 1. The attached Settlement Agreement is approved and adopted as part of this Final Order, and the parties are directed to comply with the terms of the Settlement Agreement. 2. The Agency will approve and issue CON 10131 and CON 10132 with the conditions: a. Approval of CON Application 10131 to establish a Class III specialty hospital with 60 adult psychiatric beds is concurrent with approval of the co-batched CON Application 10132 to establish a 12-bed adult substance abuse program in addition to the 60 adult psychiatric beds in one single hospital facility. b. Concurrent to the licensure and certification of 60 adult inpatient psychiatric beds, 12 adult substance abuse beds and 30 adolescent residential treatment (DCF) beds at The Shores, all 72 hospital beds and 30 adolescent residential beds at Atlantic Shores Hospital will be delicensed. c. The Shores will become a designated Baker Act receiving facility upon licensure and certification. d. The location of the hospital approved pursuant to CONs 10131 and 10132 will not be south of Los Olas Boulevard and The Shores agrees that it will not seek any modification of the CONs to locate the hospital farther south than Davie Boulevard (County Road 736). 3. Each party shall be responsible its own costs and fees. 4. The above-styled cases are hereby closed. DONE and ORDERED this 2. day of Meaich~ , 2012, in Tallahassee, Florida. ELIZABETH DEK, Secretary AGENCY FOR HEALTH CARE ADMINISTRATION

# 7
EAST FLORIDA-DMC, INC. vs AGENCY FOR HEALTH CARE ADMINISTRATION, 16-003819CON (2016)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 05, 2016 Number: 16-003819CON Latest Update: Jul. 22, 2019

The Issue The issues in these cases are whether Certificate of Need (CON) Application No. 10432 filed by East Florida-DMC, Inc. (DMC), to build an 80-bed acute care hospital in Miami-Dade County, Florida, AHCA District 11, or CON Application No. 10433 filed by The Public Health Trust of Miami-Dade County, Florida d/b/a Jackson Hospital West (JW), to build a 100-bed acute care hospital in Miami-Dade County, Florida, AHCA District 11, on balance, satisfy the applicable criteria; and, if so, whether either or both should be approved.

Findings Of Fact Based upon the parties’ stipulations, the demeanor and credibility of the witnesses, other evidence presented at the final hearing, and on the entire record of this proceeding, the following Findings of Fact are made: The Parties The Public Health Trust of Miami-Dade County d/b/a Jackson Hospital West and Jackson Health System (JHS) JHS is a taxpayer-funded health system located in and owned by Miami-Dade County. It is governed by The Public Health Trust of Miami Dade-County, Florida (PHT), a seven-member board. JHS owns and operates three acute care hospitals in Miami-Dade County--Jackson Memorial Hospital (JMH); Jackson North Medical Center (JN); and Jackson South Medical Center (JS)--as well as three specialty hospitals: Holtz Children’s Hospital (Holtz); Jackson Rehabilitation Hospital; and Jackson Behavioral Health Hospital. JHS also owns and operates numerous other non- hospital healthcare facilities within Miami-Dade County. JHS’s applicant in this proceeding is JW which, if approved, will be another acute care hospital in JHS. JHS is an academic teaching institution, and the University of Miami (UM) is JHS’s affiliated medical school. Over 1,000 UM residents staff JMH pursuant to an operating agreement with JHS. JN and JS are not academic medical centers. JHS annually receives sales tax and ad valorem tax revenues from Miami-Dade County in order to help fund its operations. JS and JN are community hospitals operated as part of JHS. JS was acquired in 2001. JS is licensed for 226 beds and is also home to a verified Level II trauma center. The JN facility was acquired by JHS in 2006. The facility is licensed for 382 beds. East Florida (DMC) DMC is an affiliate of HCA Healthcare, Inc. (HCA), the largest provider of acute care hospital services in the world. DMC will operate within HCA’s East Florida Division (EFD), which is comprised of 15 hospitals, 12 surgery centers, two diagnostic imaging centers, four freestanding emergency departments, nine behavioral health facilities, and one regional laboratory, along with other related services. There are three HCA-affiliated hospitals in Miami-Dade County: KRMC; Aventura Hospital and Medical Center (Aventura); and Mercy Hospital, a campus of Plantation General Hospital (Mercy). Kendall Regional (KRMC) KRMC, which is located at the intersection of the Florida Turnpike and Southwest 40th Street in Miami-Dade County, is a 417-bed tertiary provider comprised of 380 acute care beds, 23 inpatient adult psychiatric beds, eight Level II neonatal intensive care unit (NICU) beds, and five Level III NICU beds. It is a Baker Act receiving facility. KRMC is a verified Level I trauma center. It also has a burn program. KRMC is also an academic teaching facility, receiving freestanding institutional accreditation from the Accrediting Council for Graduate Medical Education (ACGME) in 2013. KRMC currently has six residency programs including, among others, surgery, internal medicine, podiatry, anesthesia, and surgical critical care. Its teaching programs are affiliated with the University of South Florida, Nova Southeastern University, and Florida International University. KRMC also participates in scholarly and clinical research. In 2017, KRMC had over 82,000 Emergency Department (ED) visits. It treated over 115,000 total inpatients and outpatients that year. There are 850 physicians on KRMC’s medical staff. It offers a full range of medical surgery services, interventional procedures, obstetrics (OB), pediatric, and neonatal care, among many other service lines. KRMC primarily serves southern and western portions of Miami-Dade County but also receives referrals from the Florida Keys up through Broward County, Palm Beach County, and the Treasure Coast. Its main competitors include, but are not limited to: Baptist Hospital; Baptist West; South Miami Hospital; PGH; Hialeah; CGH; JS, and Palm Springs General Hospital. The Tenet Hospitals PGH, Hialeah, and CGH are wholly-owned subsidiaries of Tenet South Florida. These are all for-profit hospitals. PGH is a 368-bed tertiary facility that opened in the early 1970s. It has 297 licensed acute care beds, 48 adult psychiatric beds, 52 ICU beds, and 15 Level II NICU beds. It is located at the Palmetto Expressway and Northwest 122nd Street in Hialeah, Florida. The hospital employs about 1,700 people and has over 600 physicians on its medical staff. PGH is a tertiary-level facility offering a variety of specialty services, including adult open heart surgery, a comprehensive stroke center, and robotic surgery. It has inpatient mental health beds and serves the community as a Baker Act receiving facility. It also offers OB and Level II NICU services with approximately 1,500 births a year. It has approximately 70,000 ED visits and between 17,000 and 18,000 inpatient admissions per year. In addition to its licensed inpatient beds, PGH operates 31 observation beds. PGH is ACGME accredited and serves a significant teaching function in the community. It has approximately 89 residents and fellows. The hospital provides fellowships in cardiology, critical care and interventional cardiology, and also has rotations in neurology and gastroenterology. Residents from Larkin General Hospital also rotate through PGH. PGH generally serves the communities of Opa Locka, Hialeah, Miami Lakes, Hialeah Gardens, Doral, and Miami Springs. In reality, all of the hospitals in the county are competitors, but more direct competition comes from Palm Springs Hospital, Memorial in Miramar, Mount Sinai, Kendall, and even its sister hospital, Hialeah. Hialeah first opened in 1951 and is a 378-bed acute care facility. It has 356 acute care beds, 12 adult psychiatric beds, and 10 Level II NICU beds. The ED has 25 beds and about 40,000 visits per year. It has approximately 14,000 inpatient admissions and 1,400 babies delivered annually. It offers services including cardiac, stroke, robotic surgery, colorectal surgery, and OB services. The hospital has a Level II NICU with 12 beds. CGH is located in the City of Coral Gables and is near the border between Coral Gables and the City of Miami on Douglas Road. It first opened in 1926. Portions of the original structure are still in use. CGH has 245 licensed beds, over 725 employees, 367 physicians, and over 100 additional allied providers on its medical staff. The hospital has a full-service ED. Its service lines include general surgery, geriatrics, urology, treatment of cardiovascular and pulmonary disease, and others. The hospital has eight operating rooms and offers robotic surgery. The ED has 28 beds divided into the main area and a geriatric emergency room. It had about 25,000 ED visits last year, which is lower than prior years, due in part to the presence of over a dozen nearby urgent care centers. CGH has over 8,500 inpatient admissions per year and is not at capacity. While patient days have grown slightly, the average occupancy is still just a little over 40%, meaning, on average, it has over 140 empty inpatient beds on any given day. The hospital is licensed for 245 beds, but typically there are only 180 beds immediately available for use. Agency for Healthcare Administration (AHCA) AHCA is the state health-planning agency charged with administration of the CON program as set forth in sections 408.31-408.0455, Florida Statutes. The Proposals Doral Medical Center (DMC) DMC proposes to build an 80-bed community hospital situated within the residential district of Doral. The hospital will be located in southwestern Doral in zip code 33126 and will serve the growing population of Doral, along with residential areas to the north and south of Doral. The hospital will be located in the City of Doral’s residential district on Northwest 41st Street between Northwest 109th Avenue to the east, and Northwest 112th Avenue to the west. Doral has seen significant growth in the past 15 years and has been consistently included on the list of the fastest growing cities in Florida. The new facility will have a bed complement of 80 licensed acute care beds, including 72 medical/surgical and eight OB beds. The proposed acute care hospital will be fully accredited by the Joint Commission for the Accreditation of Healthcare Facilities and licensed by the State of Florida. No public funds will be utilized in construction of the hospital and it will contribute to the state, county, and municipal tax base as a proprietary corporation. DMC will offer a full range of non-tertiary services, including emergency services, imaging, surgery, intensive care, cardiac catheterization, and women's services, including an OB unit, and pediatric care. DMC will be a general medical facility that will include a general medical component and a surgery component. Although DMC will operate an OB unit, NICU services will not be offered at DMC. If DMC’s patients need more advanced services, including NICU, the EFD hopes they will receive them from KRMC. The open medical staff will be largely community-based, but University of Miami physicians would be welcome at DMC. Before the hospital is built, KRMC will construct and operate a freestanding emergency department (FSED) at the location that will eventually become the ED of DMC. Construction of the FSED is now underway, and Brandon Haushalter, chief executive officer (CEO) of KRMC, estimated that it will open in March or April of 2019. Jackson West JHS proposes to build a community hospital to be known as “Jackson West” near the eastern edge of Doral. The proposed 100-bed general acute care hospital would have medical surgical and obstetrical beds and offer basic acute care services. JHS is a public health system owned by Miami-Dade County. All of JHS’s assets, as well as its debts, belong to the county. JHS is a not-for-profit entity, and therefore does not pay taxes, though it receives hundreds of millions of dollars from property taxes and sales taxes in Miami-Dade County. JHS’s main campus is a large health campus located near the Midtown Miami area in between Allapattah (to the north) and Little Havana (to the south). In addition to JMH, the campus includes Holtz Children’s Hospital, a behavioral health hospital, an inpatient rehabilitation hospital, and several specialty clinics. Bascom-Palmer Eye Institute, a Veterans Administration hospital, and University of Miami Hospital are also located adjacent to Jackson West’s main campus. JMH is a 1,500-bed hospital with a wide array of programs and services, including tertiary and quaternary care, and a Level I trauma program, the Ryder Trauma Center. JMH receives patients from throughout Miami-Dade County, elsewhere in Florida, and internationally. JMH is a teaching hospital and has a large number of residents, as well as professors from the University of Miami, on staff. UM and JMH have had a relationship for many years, and in addition to research and teaching, UM provides physician staffing to JMH. JN is a 342-bed community hospital located in between Miami Gardens and North Miami Beach, just off of I-95 and the Turnpike. JS is a 252-bed community hospital located in the Palmetto Bay area just south of Kendall. It has stroke certification and interventional cardiology, and was recently approved for a trauma program, which began in May 2016. Both JN and JS were existing hospitals that were acquired by JHS. JHS has never built a hospital from the ground up. In 2014, JHS leadership directed its internal planning team to review the healthcare needs of county residents. JHS’s analysis identified a need for outpatient services in western Miami-Dade, the only remaining quadrant of the county in which JHS did not have a hospital or healthcare program at the time. As part of its due diligence, JHS then consulted healthcare firm Kurt Salmon & Associates (KSA) to independently evaluate the data. KSA’s investigation validated a need in the west county for adult and pediatric outpatient services, including need for an FSED. This prompted JHS to explore opportunities for expansion of outpatient services where needed: in the western corridor of Miami-Dade. This was also the genesis of JHS’s long-range plan to first build an FSED in the Doral area, to be followed ultimately by the addition of a general acute care hospital at the site. The JW site is a 27-acre parcel of land located just west of the Palmetto Expressway and north of 25th Street. The site is in an industrial area only a short distance from the western end of the runways at Miami International Airport. The site is located in zip code 33122, which is very sparsely populated. JW proposed a primary service area (PSA) consisting of zip codes 33126, 33144, 33166, 33172/33122, 33174, 33178, and 33182, and a secondary service area (SSA) of zip codes 33155, 33165, 33175, and 33184. JW intends to serve general, acute care non-tertiary patients and OB patients. Detailed below, trends in the JW service area do not demonstrate need for its proposed hospital. The location of the JW site will not contribute to the viability of the proposed hospital. According to 2010 census data, only 328 people live within a one-mile radius of the JW site. Since 2000, only 32 total people have moved into that same area around the JW site--an average of three per year. There are virtually no residences within a one-mile radius of the JW site. From 2000 to 2010, the population within a two- mile radius of the JW site decreased by a rate of 9.4%. The JW health planner projects JW’s home zip code of 33122 will have a total population of only eight (8) people in 2022. From 2012 to 2014, the use rate in the JW service area for non-tertiary patients decreased by 3.9%. That decline continued at a steeper pace of 4.2% from 2014 to 2017. This was largely due to the 65+ age cohort, the demographic of patients that utilize inpatient services the most. The 65+ age cohort is growing at a slower pace in the JW service area than in Miami- Dade or Florida as a whole. Non-tertiary discharges in the JW service area are declining at a greater pace than that of Miami- Dade County--negative 4.2% compared to negative 1.9%. The rate of projected population growth in the JW PSA is decreasing. The projected rate of growth for the JW service area is lower than that of Miami-Dade County and Florida as a whole. The OB patient base JW intends to rely on is projected to remain flat. The inpatient discharges for all ages in the JW service area have declined from 2014 to 2017. For ages 0-17, discharges in the JW service area declined 21.4% during that time period. The discharges for ages 18-44 declined by 4.8%, and the discharges for ages 45-64 declined by 8.9%. The discharges for the important 65+ age cohort declined by 0.1%. Specifically, the discharges for ages 65-74 declined by 6.5%, and the discharges for ages 75-84 declined by 3.3%. The discharges for ages 85+ are the only age cohort that has not declined from 2012 to 2017. Overall, the non-tertiary discharges per 1,000 population (i.e., use rate) for all ages in the JW service area declined from 2012 to 2014 by 6%, and from 2014 to 2017 by 7.8%. Despite these declines in discharges in the JW service area, the health planners who crafted the JW projections used a constant use rate for the 0-17, 18-44, and 45-64 age cohorts. The JW health planners used a declining use rate for the 65+ age cohort. These use rates were applied uniformly across all zip codes, despite wide variance in actual use rates in each zip code. Applying the zip code specific use rates in conjunction with the other assumptions used by the JW health planner demonstrates that the JW projections are unreasonable. For instance, JW’s reliance on a uniform use rate over-projects the number of discharges in JW PSA zip code 33178 by nearly 1,000 patients. This occurs because the population is only growing at a 2% rate in the zip code, but JW’s reliance on service area-wide projections cause the discharges to grow at an extraordinary rate of 8.9% per year. Applying actual use rates across all zip codes causes a drastic change in the JW PSA and SSA definition. Section 408.037(2) requires a CON applicant to identify its PSA and SSA by listing zip codes in which it will receive discharges in descending order, beginning with the zip code with the highest amount of discharges, then proceeding in diminishing order to the zip code with the lowest amount of discharges. The zip codes, which comprise 75% of discharges, constitute the PSA; and the remaining zip codes, which consist of the remaining 25% of discharges, makes up the SSA. However, JW did not project its utilization in this manner. In its application, JW did not define its service area, PSA, and SSA zip codes in descending order by number or percentage of discharges. When this correct adjustment is made, its PSA consists of zip codes 33126, 33172, 33178, 33174, 33144, and 33165; and its SSA consists of zip codes 33175, 33166, 33155, 33182, and 33184. Zip codes 33166 and 33182 were in the original JW PSA, and zip code 33165 was in the original JW SSA. As such, JW’s home zip code should actually be in its SSA. JW health planners call this illogical, but it demonstrates that the JW site is located within a zip code that has almost no population of potential patients. JHS is developing an FSED and outpatient/ambulatory facilities on the JW site regardless of whether its CON application for a hospital is approved. Construction has begun on the JW site, and JHS is actually building a “shelled in” structure intended to house a future hospital, notwithstanding lack of CON approval for the hospital. There is no contingency plan for use of the shelled-in hospital space if CON approval is not obtained. JHS executives unequivocally stated that they intend to continue pursuing CON approval for the JW hospital, even if the proposed DMC hospital is approved. Indeed, JHS has filed third and fourth CON applications for its proposed JW hospital. The budget for the JW campus is $252 million. Sixty to $70 million is being funded from a bond issuance approved by voters in Miami-Dade County. Notably, the bond referendum approved by voters made no mention of a new hospital. The remaining $180 to $190 million is being funded by JHS, which has chosen to only keep 50 days cash-on-hand, and put any surplus toward capital projects. This is well below the number of days cash-on-hand ws advisable for a system like JHS. The specific programs and services to be offered at JW have not been finalized, but it is clear that JW will be a small community hospital that will not offer anything unique or different from any of the existing hospitals in the area, nor will it operate NICU beds. Patients presenting to JW in need of specialized or tertiary services will need to be transferred to another hospital with the capability of serving them, most likely JMH. The Applicants’ Arguments Doral Medical Center (DMC) DMC’s arguments in support of its proposed hospital may be summarized as follows: Geographic features surrounding Doral create transportation access barriers for the residents of the area; Doral is a densely-populated community that is growing quickly and lacks a readily accessible hospital; KRMC, which is the provider of choice for Doral residents, is a growing tertiary facility that cannot sufficiently expand to meet its future demands. DMC will serve much of the same patient population currently served by KRMC and help decompress KRMC’s acute care load so KRMC can focus on its tertiary service lines; From a geographic standpoint, the Doral community and its patients are isolated from much of Miami-Dade County to the north, west, and east, and the nearest hospitals. East Florida-DMC is a subsidiary of HCA and would be a part of the HCA EFD. Michael Joseph is the president of the EFD, which includes 15 hospitals and other facilities from Miami north through the Treasure Coast. Mr. Joseph authorized the filing of the DMC CON application, which proposes an 80-bed basic acute care hospital that includes 72 medical surgical and eight OB beds. As noted, there will be neither unique services at DMC nor any tertiary services, such as a NICU. HCA anticipates that DMC patients needing tertiary services would be referred and treated at KRMC. The proposed hospital would be built on 41st Street, between Northwest 109th Avenue and Northwest 112th Avenue. This site is located on the western edge of Doral, just east of the Everglades. When the consultants were retained to write the first DMC CON application, HCA had already made the decision to go forward with the project. Mr. Joseph described Miami-Dade County as one of the most competitive markets in the country for hospital services. There is robust competition in the Miami-Dade market from the standpoints of payors, physicians, and the many hospitals located in the county, including Jackson, HCA, Tenet, Baptist and others. HCA is not proposing this project because any of the existing hospitals in the area do not provide good quality care. HCA is currently building an FSED on the DMC site that will open regardless of whether the DMC hospital is approved. Mr. Joseph acknowledged that there is a trend toward outpatient rather than inpatient care. Inpatient occupancy of acute care hospitals in Miami-Dade County has been declining in recent years. Managed care has added further pressure on reducing inpatient admissions. Surgical advances have also resulted in fewer inpatient admissions. Surgeries that formerly required an inpatient stay are now often done on an outpatient basis. Mr. Joseph agreed that 30 minutes is a reasonable travel time to access an acute care hospital. The home zip code for the proposed DMC hospital is 33178. KRMC’s market share for that zip code is 20%. Individuals in that zip code are currently accessing a wide variety of hospitals. PGH is only 6.7 miles away and has the fourth highest market share in that zip code. HCA’s healthcare planning expert, Dan Sullivan, acknowledged that, if approved, DMC would likely have an adverse financial impact on KRMC and other area hospitals. Several witnesses testified that the travel time from the DMC site to KRMC is about 10 minutes, and that an ambulance could do it in as little as five minutes. As to the argument that the residents of Doral face geographic access barriers, the evidence did not indicate that there is anything unique about Doral from a traffic standpoint compared to other parts of Miami-Dade County. People come in and out of Doral on a daily basis in significant numbers for work and other reasons via various access points. Witnesses agreed that 25 to 30 minutes is a reasonable drive time for non-tertiary acute care services, and the evidence showed that residents of Doral, and the DMC service area, are well within 30 minutes of multiple hospitals providing more intensive services than are proposed by DMC. Indeed, many residents of DMC’s service area are closer to other hospitals than to the DMC site. None of the DMC witnesses were able to identify any patient in Doral who had been unable to access acute care services, or had suffered a bad outcome because of travel from Doral to an area hospital. The evidence did not establish that there currently exists either geographic or financial access barriers within the service area proposed to be served by DMC. Jackson West As in its Batch One application, JW advances six arguments as to why its proposed hospital should be approved. They are: It will serve a significant amount of indigent and Medicaid patients. JHS already serves residents of the proposed service area, which JW characterizes as “fragmented,” in that residents go to a number of different hospitals to receive services. Development of the freestanding ED and ambulatory center is under way. JW would provide an additional opportunity to partner with UM and FIU. There is physician and community support for the project. JW will add to the financial viability of JHS and its ability to continue its mission. JW presented very little analysis of the types of factors typically considered in evaluating need for a new hospital. JW did not discuss existing providers and their programs and services, the utilization of existing hospitals, and whether they have excess capacity, or other important considerations. Instead, JW advanced the six arguments noted above, for approval of its proposed hospital, none of which truly relate to the issue of need. First, JW states that its proposed hospital will serve a significant level of Medicaid and indigent patients. While it is true that JHS serves a significant amount of Medicaid and indigent patients, there are a number of reasons why this is not a basis to approve its proposed hospital. As an initial matter, JW treads a fine line in touting its service to Medicaid and indigent patients, while also targeting Doral for its better payer mix and financial benefit to JHS. JHS also receives an enormous amount of tax dollars to provide care to indigent and underserved patients. While other hospitals in Miami-Dade County provide care to such patients, they do not receive taxpayer dollars, as does JHS, although they pay taxes, unlike JHS. Also, Medicaid is a good payer for JHS. With its substantial supplement, JHS actually makes money from Medicaid patients, and it costs the system more for a Medicaid patient to be treated at a JHS hospital than elsewhere. More significantly, there is not a large Medicaid or indigent population in Doral, nor evidence of financial access issues in Doral. Second, JW argues that its CON application should be approved because JHS already serves patients from the Doral area, which JW characterizes as “fragmented” because area residents go to several different hospitals for care. This so- called “fragmentation” is not unique to Doral, and is not unusual in a densely-populated urban market with several existing hospitals. The same phenomenon occurs in other areas of Miami-Dade County, some of which actually have a hospital in the localized area. The fact that Doral residents are accessing several different hospitals demonstrates that there are a number of existing providers that are accessible to them. As discussed in greater detail below, residents of the Doral area have choices in every direction (other than to the west, which is the Everglades). JHS itself already serves patients from the Doral area. If anything, this tells us that patients from Doral currently have access to the JHS hospitals. Third, JW argues that its CON application should be approved because development of the JW campus is under way. This is irrelevant to the determination of need, and is simply a statement of JHS’s intent to build an FSED and outpatient facilities on a piece of land that was acquired for that purpose, regardless of CON approval. Fourth, JW argues for approval of its proposed hospital because it would provide an additional opportunity to partner with UM and Florida International University (FIU). However, the statutory criteria no longer addresses research and teaching concerns, and JHS’s relationship with UM or FIU has no bearing on whether there is a need for a new hospital in the Doral area. Moreover, JW did not present any evidence of how it would partner with UM or FIU at JW, and there does not seem to be any set plans in this regard. Fifth, JW claims that there is physician and community support for its proposed hospital, but it is very common for CON applicants to obtain letters in support for applications. Indeed, the DMC application was also accompanied by letters of support. Sixth and finally, JW argues that its proposed hospital will add to the financial viability of HSA and allow it to continue its mission. However, JW provided no analysis of the projected financial performance of its proposed hospital to substantiate this. The only financial analysis in the record is from KSA, a consulting firm that JHS hired to analyze the programs and services to be developed at JW. The KSA analysis posits that the JW FSED project will lose millions of dollars and not achieve break-even unless there is an inpatient hospital co-located there so that JW can take advantage of the more lucrative hospital-based billing and reimbursement. The sixth “need” argument relates to the issue of JHS’s historical financial struggles, which bear discussion. Only a handful of years ago, the entire JHS was in dire financial trouble, so much so that selling all or parts of it was considered. Days cash-on-hand was in the single digits, and JHS fell out of compliance with bond covenants. JHS’s financial difficulties prompted the appointment of an outside monitor to oversee JHS’s finances. Price Waterhouse served in that role, and made several recommendations for JHS to improve its revenue cycle, make accounting adjustments, and improve its staffing and efficiency. As a result of these recommendations, JHS went through a large reduction in force, and began to more closely screen the income and residency of its patients. As a result of these measures, overall financial performance has since improved. Despite its improved financial position, JHS still consistently loses money on operations, including a $362,000,915 loss as of June 30, 2018. JHS clearly depends upon the hundreds of millions of non-operating tax-based revenues it receives annually. JHS’s CEO expressed concerns over decreases in the system’s non-operating revenue sources, and claimed that JHS needs to find ways to increase its operating revenue to offset this. JW is being proposed as part of this strategy. However, JHS’s chief financial officer testified that “the non-operating revenues are a fairly stable source of income.” In fact, JHS’s tax revenues have gone up in the last few years. JHS sees the more affluent Doral area as a source of better paying patients that will enhance the profitability of its new hospital. Beyond this aspiration however, there is no meaningful analysis of the anticipated financial performance of its proposed hospital. This is a glaring omission given that a significant impetus for spending millions of public dollars on a new hospital is to improve JHS’s overall financial position. The KSA analysis referenced above determined that changes to the Hospital Outpatient Prospective Payment System rule would result in the JW campus losing hundreds of millions of dollars and never reaching “break even,” absent an inpatient hospital on the campus for “hospital based” billing and reimbursement. Though a financial benefit to the system, the increased reimbursement JHS would receive by having an inpatient hospital on the JW campus would be a financial burden on the healthcare delivery system since it would cost more for the same patient to receive the same outpatient services in a hospital- based facility. Reports by KSA also state that a strategic purpose of JW is to attract patients that would otherwise go to nearby facilities like PGH and Hialeah, and to capture tertiary or higher complexity cases which would then be sent to JMH. JW’s witnesses and healthcare planning experts fully expect this to happen. In 2015, and again in 2017, JHS conducted a “Community Health Needs Assessment,” which is required by law to be performed by public safety net hospitals. The assessments were conducted by gathering responses to various questions from a wide array of community leaders and stakeholders, including the CEOs of JHS’s hospitals, about the healthcare needs of the community. The final Community Health Needs Assessment documents are lengthy and cover a variety of health-related topics, but most notable for this case is that: (1) nowhere in either the 2015 or 2017 assessment is the development of a new hospital recommended; and (2) expansion into western Miami-Dade County scored by far the lowest on a list of priorities for JHS. In its application and at hearing, JW took the position that JW can enter the Doral area market without impacting existing providers to any meaningful extent. While JW acknowledges that its proposed hospital would impact the Tenet Hospitals, it argues that the impact is not significant. The evidence established that the financial impact to the Tenet Hospitals (calculated based upon lost contribution margin) would total roughly $3 million for lost inpatients, and $5.2 million including lost outpatients. While these losses will not put the Tenet Hospitals in financial peril, they are nonetheless significant and material. The Existing Healthcare Delivery System Miami-Dade County is home to 18 freestanding acute care hospitals, comprising a total of 7,585 licensed and approved acute care beds. With an average annual occupancy of 53.8% in calendar year 2017, there were, on average, approximately 3,500 unoccupied acute care beds in the county on any given day. While the countywide occupancy rate fluctuates from year to year, it has been on a downward trend in the past several years. As pointed out by several witnesses, the lack of a hospital in Doral is not itself an indication of need. In addition, population growth, and the demands of the population for inpatient hospital beds, cannot be considered in a vacuum. Sound healthcare planning requires an analysis of existing area hospitals, including the services they offer and their respective locations; how area residents travel to existing hospitals and any barriers to access; the utilization of existing hospitals and amount of capacity they have; and other factors which may be relevant in a given case. The population of Doral currently is only about 59,000 people. It is not as densely populated as many areas of Miami-Dade County, has a number of golf course communities, and is generally a more affluent area with a higher average household income than much of Miami-Dade County. As set forth in JW’s CON application, the better payer mix in Doral was a significant factor behind its decision to file its CON application. Although there is not a hospital within the Doral city limits, there are a number of healthcare providers in Doral and several hospitals nearby. PGH and Palm Springs Hospital are just north of Doral. KRMC is just south of Doral. Hialeah is northeast of Doral. CGH, Westchester General, and NCH are southeast of Doral. JMH and all of its facilities are east of Doral. And there are others within reasonable distance. KRMC is only six miles due south of the proposed DMC site, and PGH is just eight miles north of the DMC site. As to the JW site, PGH is 6.9 miles distant, CGH is 8.6 miles distant, and Hialeah is 7.4 miles distant. Residents of the Doral area have many choices in hospitals with a wide array of services, and they are accessing them. The parties to this case, as well as other existing hospitals, all have a share of the Doral area market. JW calls this “fragmentation” of the market and casts it in a negative light, but the evidence showed this to be a normal phenomenon in an urban area like Miami, with several hospitals in healthy competition with each other. Among the experts testifying at the hearing, it was undisputed that inpatient acute care hospital use rates are on the decline. There are different reasons for this, but it was uniformly recognized that decreasing use rates for inpatient services, and a shift toward outpatient services, are ongoing trends in the market. Recognizing the need for outpatient services in the Doral area, both JW and DMC (or, more accurately, their related entities) have proposed outpatient facilities and services to be located in Doral. Kendall Regional Medical Center KRMC is currently the dominant hospital provider in the Doral area. Regarding his motivation for filing the DMC application, Mr. Joseph readily admitted “it’s as much about protecting what I already currently provide, number one.” KRMC treats Medicaid and indigent patients. KRMC has never turned away a patient because it did not have a contract with a Medicaid-managed care company. The CEO agreed that there is no access problem for Medicaid or charity patients justifying a new hospital. It was argued that KRMC is crowded, and the DMC hospital would help “decompress” KRMC, but the evidence showed that KRMC has a number of licensed beds that are not being used for inpatients. In addition, its ED has never gone on diversion, and no patient has ever been turned away due to the lack of a bed. Moreover, the census at KRMC has been declining. It had 25,324 inpatient admissions in 2015, 24,649 admissions in 2016, and 23,301 in 2017. The most recent data available at the time of hearing reflected that KRMC has been running at a little less than 75% occupancy, before its planned bed additions. KRMC is between an eight to 10 minute drive from Doral, and currently has the largest market share within the applicants’ defined service areas. KRMC is readily available and accessible to the residents of Doral. KRMC currently has a $90 million dollar expansion project under way. It involves adding beds and two new floors to the West Tower--a new fifth floor which will add 24 ICU beds and 24 step-down beds, and a new sixth floor which will house the relocated pediatric unit and 12 new medical-surgical beds. KRMC is also adding a new nine-story, 765 parking space garage and other ancillary space. This expansion will reduce the occupancy rate of KRMC’s inpatient units, and in particular its ICUs. These bed additions, in conjunction with increasing emphasis on outpatient services and the resultant declining inpatient admissions, will alleviate any historical capacity constraints KRMC may have had. There are also a number of ways KRMC could be further expanded in the future if needed. The West Tower is designed so it could accommodate a seventh floor, and the East Tower is also designed so that an additional floor could also be added to it. In addition, KRMC recently completed construction of a new OR area that is built on pillars. The new construction includes a third floor of shelled-in space that could house an additional 12 acute care beds. Moreover, this new OR tower was designed to go up an additional two to three floors beyond the existing shelled-in third floor. It is clear that KRMC has implemented reasonable strategies for addressing any bed capacity issues it may have experienced in the past. Decompression of KRMC is not a reason to approve DMC. Palmetto General Hospital Evidence regarding PGH was provided by its CEO Ana Mederos. Ms. Mederos is a registered nurse and has lived in Miami-Dade County for many years. She has a master of business education from Nova University and has worked in several different hospitals in the county. Specifically, she was the chief operating officer (COO) at Cedars Medical Center, the CEO at North Shore Medical Center, the CEO at Hialeah Hospital, and has been the CEO at PGH since August of 2006. Ms. Mederos is one of the few witnesses that actually lives in Doral. She travels in and out of the area on a daily basis. Her average commute is only about 15 minutes, and she has multiple convenient options in and out of Doral. PGH is located just off the Palmetto Expressway at 68th Street. It opened in the early 1970s and has 368 licensed beds, including 52 ICU beds. The hospital employs about 1,800 people and has over 600 physicians on its medical staff. PGH’s occupancy has declined from 79.8% in 2015 to 64% in 2016, and even further to 56.7% in 2017. There are many reasons for this decline, including pressure from managed care organizations, the continued increase in the use of outpatient procedures, improvements in technology, and increased competition in the Miami-Dade County market. Ms. Mederos expects that inpatient demand will continue to decline into the foreseeable future. PGH recently activated 31 observation beds to help improve throughput and better accommodate the increasing number of observation patients. PGH offers high-quality care and uses various metrics and indicators to measure and monitor what is going on in the hospital. The hospital has also been recognized with numerous awards. Through its parent, Tenet, PGH has contracts with just about every insurance and managed care company that serves the community. The hospital treats Medicaid and indigent patients. PGH’s Medicaid rate of $3,580 per patient is significantly lower than the rate paid to JMH. PGH has an office dedicated to helping patients get qualified for Medicaid or other financial resources, which not only helps the hospital get paid for its services, it also assists patients and families to make sure that they have benefits on an ongoing basis. Roughly 9-10% of PGH’s patients annually are completely unfunded. PGH only transfers patients if there is a need for a service not provided at the hospital, or upon the patient’s request. PGH does not transfer patients just because they cannot pay. PGH pays physicians to take calls in the ED which also obligates those physicians to provide care to patients that are seen at the hospital. PGH is a for-profit hospital that pays income taxes and property taxes, and does not receive any taxpayer subsidies like those received by JHS. Ms. Mederos reviewed the applications of JW and DMC, and articulated a number of reasons why, in her opinion, neither application should be approved. She sees no delays in providing care to anyone in the area, as there are hospitals serving Doral in every direction. There are a multitude of FSEDs available and additional FSEDs are being built in Doral by both applicants. There is another FSED being built close to PGH by Mount Sinai Medical Center. NCH has also opened an FSED that has negatively affected the volume of pediatric patients seen at PGH. There are also multiple urgent care centers. It was Ms. Mederos’ firm belief that persons living in Doral have reasonable geographic access to both inpatient and outpatient medical services. Ms. Mederos’ testimony in this regard is credited. There are no programs or services being proposed by either applicant that are not already available in the area. Ms. Mederos also noted that there is currently no problem with access to OB services in the area. However, she has a particular concern in that both applicants propose to offer OB services, but neither is proposing to offer NICU services. The evidence showed that most all of the hospitals that provide OB services to the Doral area offer at least Level II and some Level III NICU services. Thus, in terms of OB care, both proposed hospitals would be a step below what has developed as the standard of care for OB patients in the county. Ms. Mederos acknowledged that PGH does not have a huge market share in the zip codes that the applicants are proposing to serve, but that does not mean that the impact from either would not be real and significant. If a hospital is built by either applicant, it will need physicians, with some specialists in short supply. There are tremendous shortages in certain medical fields, such as orthopedics and neurology. In addition, there will be additional competition for nurses and other staff, which will increase the cost of healthcare. The loss of $1.3 to $2 million in contribution margin, as projected by Tenet’s healthcare planner, is a negative impact on PGH as hospital margins become thinner, and those numbers do not include costs like those needed to recruit and retain staff. PGH is again experiencing a nursing shortage, and losing nurses, incurring the higher cost for contract labor, paying overtime, and essentially not having the staff to provide the required services is a serious potential adverse impact from either proposed new hospital. JHS also tends to provide more lucrative benefits than PGH, and a nearby JW hospital is a threat in that regard. As a final note, Ms. Mederos stated that her conviction that there is no need for either proposed hospital in Doral is even more resolute than when she testified in the Batch One Case. With continued declines in admissions, length of stay and patient days, the development of more services for the residents of Doral, the shortages of doctors and nurses, the ever increasing role of managed care that depresses the demand for inpatient hospital services and other factors, she persuasively explained why no new hospitals are needed in the Doral area. Coral Gables Hospital (CGH) Maria Cristina Jimenez testified on behalf of CGH, where she has worked in a variety of different capacities since 1985. She was promoted to CEO in March 2017. She has lived in Miami her entire life. Ms. Jimenez has been involved in initiatives to make her hospital more efficient. She is supportive of efforts to reduce inpatient hospitalizations and length of stay, as this is what is best for patients. Overall, the hospital length of stay is dropping, which adds to the decreasing demand for inpatient services. CGH is accredited by the Joint Commission, has received multiple awards, and provides high-quality care to its patients. It also has contracts with a broad array of managed care companies as do the other Tenet hospitals. CGH treats Medicaid patients, and its total Medicaid rate is less than $3,500 per inpatient. The hospital has a program similar to PGH to help patients get qualified for Medicaid and other resources. CGH also provides services to indigent patients, and self-pay/charity is about 6% of the hospital’s total admissions. The hospital does not transfer patients just because they are indigent. Physicians are compensated to provide care in the emergency room and are expected to continue with that care if the patients are admitted to the hospital, even if they do not have financial resources. CGH also pays income and property taxes, but does not receive any taxpayer support. CGH generally serves the Little Havana, Flagami, Miami, and Coral Gables communities, and its service area overlaps with those of the applicants. In order to better serve its patients and to help it compete in the highly competitive Miami-Dade County marketplace, CGH is developing a freestanding ED at the corner of Bird Road and Southwest 87th Avenue, which is scheduled to open in January 2020. This will provide another resource for patients in the proposed service areas. Ms. Jimenez had reviewed the CON applications at issue in this case. She does not believe that either hospital should be approved because it will drain resources from CGH, not only from a financial standpoint, but also physician and nurse staffing. CGH experiences physician shortages. Urologists are in short supply, as are gastrointestinal physicians that perform certain procedures. Hematology, oncology, and endocrinology are also specialty areas with shortages. The addition of another hospital will exacerbate those shortages at CGH. While CGH does not have a large market share in the proposed PSA of either applicant, anticipated impact from approval of either is real and substantial. A contribution margin loss of $1.2 to $2.2 million per year, as projected by Tenet’s healthcare planner, would be significant. The drain on resources, including staff and physicians, is also of significant concern. Hialeah Hospital Dr. Jorge Perez testified on behalf of Hialeah. Dr. Perez is a pathologist and medical director of laboratory at the hospital. More significantly, Dr. Perez has been on the hospital’s staff since 2001 and has served in multiple leadership roles, including chair of the Performance Improvement Council, chief of staff; and since 2015, chair of the Hialeah Hospital Governing Board. Hialeah offers obstetrics services and a Level II NICU with 12 beds. Approximately 1,400 babies a year are born there. Hialeah’s occupancy has been essentially flat for the past three years, at below 40%, and it clearly has ample excess capacity. On an average day, over 200 of Hialeah’s beds are unoccupied. Like other hospitals in the county, Hialeah has a number of competitors. The growth of managed care has affected the demand for inpatient beds and services at Hialeah. Hialeah treats Medicaid and indigent patients. Approximately 15% of Hialeah’s admissions are unfunded. As with its sister Tenet hospitals, Hialeah is a for- profit hospital that pays taxes and does not receive tax dollars for providing care to the indigent. Dr. Perez succinctly and persuasively identified a variety of reasons why no new hospital is needed in Doral. First and foremost, there is plenty of capacity at the existing hospitals in the area, including Hialeah. Second, both inpatient admissions and length of stay continue trending downward. Care continues to shift toward outpatient services, thereby reducing the demand for inpatient care. According to Dr. Perez, if a new hospital is approved in Doral it will bring with it adverse impacts on existing hospitals, including Hialeah. A new hospital in Doral will attract patients, some of which would have otherwise gone to Hialeah. Moreover, Doral has more insured patients, meaning the patients that would be lost would be good payors. There would also be a significant risk of loss of staff to a new hospital. Dr. Perez’s testimony in this regard is credible. Statutory and Rule Review Criteria In 2008, the Florida Legislature streamlined the review criteria applicable for evaluating new hospital applications. Mem’l Healthcare Grp. v. AHCA, Case No. 12- 0429CON, RO at 32 (Fla. DOAH Dec. 7, 2012). The criteria specifically eliminated included quality of care, availability of resources, financial feasibility, and the costs and methods of proposed construction. Lee Mem’l Health System v. AHCA, Case No. 13-2508CON, RO at 135 (Fla. DOAH Mar. 28, 2014). The remaining criteria applicable to new hospital projects are set forth at section 408.035(1), Florida Statutes. Section 408.035(1)(a): The need for the healthcare facilities and health services being proposed. Generally, CON applicants are responsible for demonstrating need for new acute care hospitals, typically in the context of a numeric need methodology adopted by AHCA. However, AHCA has not promulgated a numeric need methodology to calculate need for new hospital facilities. Florida Administrative Code Rule 59C-1.008(2)(e) provides that if no agency need methodology exists, the applicant is responsible for demonstrating need through a needs assessment methodology, which must include, at a minimum, consideration of the following topics, except where they are inconsistent with the applicable statutory and rule criteria: Population demographics and dynamics; Availability, utilization and quality of like services in the district, subdistrict, or both; Medical treatment trends; and Market conditions. Both applicants propose to build small community hospitals providing basic acute care and OB services in the Doral area of western Miami-Dade County. Both applicants point to the increasing population and the lack of an acute care hospital in Doral as evidence of need for a hospital. The DMC application focuses largely on geographic access concerns, while the JW application is premised upon six arguments as to why JHS contends its proposed JW hospital should be approved. The lack of a hospital in Doral is not itself an indication of need.3/ In addition, population growth, and the demands of the population for inpatient hospital beds, cannot be considered in a vacuum. Sound healthcare planning requires an analysis of existing area hospitals, including the services they offer and their respective locations; how area residents travel to existing hospitals, and any barriers to access; the utilization of existing hospitals and amount of capacity they have; and other factors which may be relevant in a given case. Doral is in the west/northwest part of Miami-Dade County, in between the Miami International Airport (to the east) and the Everglades (to the west). It is surrounded by major roadways, with US Highway 27/Okeechobee Road running diagonally to the north, US Highway 836/Dolphin Expressway running along its southern edge, US Highway 826/Palmetto Expressway running north-south to the east, and the Florida Turnpike running north- south along the western edge of Doral. To the west of the Turnpike is the Everglades, where there is minimal population and very limited development possible in the future. The City of Doral itself has an area of about 15 square miles, and is only two or three times the size of the Miami International Airport, which sits just east of Doral. Much of Doral is commercial and industrial, with the largest concentration of residential areas being in the northwest part of the city. While there is unquestionably residential growth in Doral, the population of Doral is currently only about 59,000 people. Doral is not as densely populated as many areas of Miami-Dade County, has a number of golf course communities, and is generally a more affluent area with a higher average household income than much of Miami-Dade County. JW proposes to locate its hospital on the eastern side of Doral, just west of Miami International Airport, while the DMC site is on the western side of Doral, just east of the Everglades. JW’s site is located in an industrial area with few residents, while the DMC site is located in an area where future growth is likely to be limited. Both sites have downsides for development of a hospital, with both applicants spending considerable time at hearing pointing out the flaws of each other’s chosen location. Both applicants define their service areas to include the City of Doral, but also areas outside of Doral. Notably, the entire DMC service area is contained within KRMC’s existing service area, with the exception of one small area. While the population of Doral itself is only 59,000 people, there are more concentrated populations in areas outside of Doral (except to the west). However, the people in these areas are closer to existing hospitals like PGH, Hialeah, KRMC, and others. For the population inside Doral, there are several major roadways in and out of Doral, and area residents can access several existing hospitals with plenty of capacity within a 20-minute drive time, many closer than that. It was undisputed that inpatient acute care hospital use rates continue to decline. There are different reasons for this, but it was uniformly recognized that decreasing inpatient use rates, and a shift toward outpatient services, are ongoing trends in the market. These trends existed at the time of the Batch One Case. As observed by Tenet’s healthcare planner at hearing: “The occupancy is lower today than it was two years ago, the use rates are lower, and the actual utilization is lower.” Both applicants failed to establish a compelling case of need. While there is growth in the Doral area, it remains a relatively small population, and there was no evidence of community needs being unmet. Sound healthcare planning, and the statutory criteria, require consideration of existing hospitals, their availability, accessibility, and extent of utilization. These considerations weigh heavily against approval of either CON application, even more so than in the prior case. Section 408.035(1)(b): The availability, accessibility, and extent of utilization of existing healthcare facilities and health services in the service district of the applicant; and Section 408.035(1)(e): The extent to which the proposed services will enhance access to healthcare for residents of the service district. As stated above, there are several existing hospitals in close proximity to Doral. Thus, the question is whether they are accessible and have capacity to serve the needs of patients from the Doral area. The evidence overwhelmingly answers these questions in the affirmative. Geographic access was a focal point of the DMC application, which argued that there are various barriers to access in and around Doral, such as a canal that runs parallel to US Highway 27/Okeechobee Road, train tracks and a rail yard, industrial plants, and the airport. While the presence of these things is undeniable, as is the fact that there is traffic in Miami, based upon the evidence presented, they do not present the barriers that DMC alleges. Rather, the evidence was undisputed that numerous hospitals are accessible within 20 minutes of the proposed hospital sites, and some within 10 to 15 minutes. All of Doral is within 30 minutes of multiple hospitals. These are reasonable travel times and are not indicative of a geographic access problem, regardless of any alleged “barriers.” In addition, existing hospitals clearly have the capacity to serve the Doral community, and they are doing so. Without question, there is excess capacity in the Miami-Dade County market. With approximately 7,500 hospital beds in the county running at an average occupancy just over 50%, there are around 3,500 beds available at any given time. Focusing on the hospitals closest to Doral (those accessible within 20 minutes), there are hundreds of beds that are available and accessible from the proposed service areas of the applicants. KRMC is particularly noteworthy because of its proximity to, and market share in, the Doral area. The most recent utilization and occupancy data for KRMC indicate that it has, on average, 100 vacant beds. This is more than the entire 80-bed hospital proposed in the DMC application (for a service area that is already served and subsumed by KRMC). Moreover, KRMC is expanding, and will soon have even more capacity at its location less than a 10-minute drive from the DMC site. From a programmatic standpoint, neither applicant is proposing any programs or services that are not already available at numerous existing hospitals, and, in fact, both would offer fewer programs and services than other area hospitals. As such, patients in need of tertiary or specialized services will still have to travel to other hospitals like PGH, KRMC, or JMH. Alternatively, if they present to a small hospital in Doral in need of specialized services, they will then have to be transferred to an appropriate hospital that can treat them. The same would be true for babies born at either DMC or JW in need of a NICU. Similarly, there are bypass protocols for EMS to take cardiac, stroke, and trauma patients to the closest hospital equipped to treat them, even if it means bypassing other hospitals not so equipped, like JW and DMC. Less acute patients can be transported to the closest ED. And since both applicants are building FSEDs in Doral, there will be ample access to emergency services for residents of Doral. This criterion does not weigh in favor of approval of either hospital. To the contrary, the evidence overwhelmingly established that existing hospitals are available and accessible to Doral area residents. Section 408.035(1)(e), (g) and (i): The extent to which the proposed services will enhance access to healthcare, the extent to which the proposal will foster competition that promotes quality and cost-effectiveness, and the applicant’s past and proposed provision of healthcare services to Medicaid patients and the medically indigent. It goes without saying that any new hospital is going to enhance access to the people closest to its location; but as explained above, there is no evidence of an access problem, or any pressing need for enhanced access to acute care hospital services. Rather, the evidence showed that Doral area residents are within very reasonable travel times to existing hospitals, most of which have far more extensive programs and services than either applicant is proposing to offer. Indeed, the proposed DMC service area is contained within KRMC’s existing service area, and KRMC is only 10 minutes from the DMC site. Neither applicant would enhance access to tertiary or specialized services, and patients in need of those services will still have to travel to other hospitals, or worse, be transferred after presenting to a Doral hospital with more limited programs and services. Although it was not shown to be an issue, access to emergency services is going to be enhanced by the FSEDs being built by both applicants. Thus, to the extent that a new hospital would enhance access, it would be only for non-emergent patients in need of basic, non-tertiary level care. Existing hospitals are available and easily accessible to these patients. In addition, healthy competition exists between several existing providers serving the Doral area market. That healthy competition would be substantially eroded by approval of the DMC application, as HCA would likely capture a dominant share of the market. While approval of the JW application might not create a dominant market share for one provider, it would certainly not promote cost-effectiveness given the fact that it costs the system more for the same patient to receive services at a JHS hospital than other facilities. Indeed, approval of JW’s application would mean that the JW campus will have the more expensive hospital-based billing rates. Florida Medicaid diagnosis related group (DRG) payment comparisons among hospitals are relevant because both DMC and JW propose that at least 22% of their patients will be Medicaid patients. Data from the 2017-18 DRG calculator provided by the Medicaid program office was used to compare JHS to the three Tenet hospitals, KRMC, and Aventura Hospital, another EFD hospital in Miami-Dade County. The data shows that JHS receives the highest Medicaid rate enhancement per discharge for the same Medicaid patients ($2,820.06) among these six hospitals in the county. KRMC receives a modest enhancement of $147.27. Comparison of Medicaid Managed Care Reimbursement over the period of fiscal years 2014-2016 show that JHS receives substantially more Medicaid reimbursement per adjusted patient day than any of the hospitals in this proceeding, with the other hospitals receiving between one-third and one-half of JHS reimbursement. In contrast, among all of these hospitals, KRMC had the lowest rate for each of the three years covered by the data, which means KRMC (and by extension DMC) would cost the Medicaid program substantially less money for care of Medicaid patients. Under the new prospective payment system instituted by the State of Florida for Medicaid reimbursement of acute care hospital providers, for service between July 1, 2018, and March 31, 2019, JHS is the beneficiary of an automatic rate enhancement of more than $8 million. In contrast, KRMC’s rate enhancement is only between $16,000 and $17,000. Thus, it will cost the Medicaid program substantially more to treat a patient using the same services at JW than at DMC. Furthermore, rather than enhance the financial viability of the JHS system, the evidence indicates that the JW proposal will be a financial drain on the JHS system. Finally, JHS’s past and proposed provision of care to Medicaid and indigent patients is noteworthy, but not a reason to approve its proposed hospital. JW is proposing this hospital to penetrate a more affluent market, not an indigent or underserved area, and it proposes to provide Medicaid and indigent care at a level that is consistent with the existing hospitals. JHS also receives the highest Low Income Pool (LIP) payments per charity care of any system in the state, and is one of only a handful of hospital systems that made money after receipt of the LIP payments. HCA-affiliated hospitals, by comparison, incur the second greatest cost in the state for charity care taking LIP payments into consideration. Analysis of standardized net revenues per adjusted admission (NRAA) among Miami-Dade County acute care hospitals, a group of 16 hospitals, shows JHS to be either the second or the third highest hospital in terms of NRAA. KRMC, in contrast, part of the EFD/HCA hospitals, is about 3% below the average of the 16 hospitals for NRAA. DMC’s analysis of standardized NRAA using data from 2014, 2015, and 2016, among acute care hospitals receiving local government tax revenues, shows JHS receives more net revenue than any of the other hospitals in this grouping. Using data from FY 2014 to FY 2016, DMC compared hospital costs among the four existing providers that are parties to this proceeding and JMH as a representative of JHS. Standardizing for case mix, fiscal year end, and location, an analysis of costs per adjusted admission shows that the hospitals other than JMH have an average cost of between a half and a third of JMH’s average cost. The same type of analysis of costs among a peer group of eight statutory teaching hospitals shows JHS’s costs to be the highest. It should also be noted that if JW were to fail or experience significant losses from operations, the taxpayers of Miami-Dade County will be at risk. In contrast, if DMC were to fail financially, EFD/HCA will shoulder the losses. When the two applications are evaluated in the context of the above criteria, the greater weight of the evidence does not mitigate in favor of approval of either. However, should AHCA decide to approve one of the applicants in its final order, preference should be given to DMC because of its lower costs per admission for all categories of payors, and in particular, the lower cost to the Florida Medicaid Program. In addition, the risk of financial failure would fall upon EFD/HCA, rather than the taxpayers of Miami-Dade County. Rule 59C-1.008(2)(e): Need considerations. Many of the considerations enumerated in rule 59C- 1.008(2)(e) overlap with the statutory criteria, but there are certain notable trends and market conditions that warrant mention. Specifically, while the population of Doral is growing, it remains relatively small, and does not itself justify a new hospital. And while there are some more densely populated areas outside of the city of Doral, they are much closer to existing hospitals having robust services and excess capacity. Doral is a more affluent area, and there was no evidence of any financial or cultural access issues supporting approval of either CON application. The availability, utilization, and quality of existing hospitals are clearly not issues, as there are several existing hospitals with plenty of capacity accessible to Doral area residents. In terms of medical treatment trends, it was undisputed that use rates for inpatient hospital services continue trending downward, and that trend is expected to continue. Concomitantly, there is a marked shift toward outpatient services in Miami-Dade County and elsewhere. Finally, both applicants are proposing to provide OB services without a NICU, which is below the standard in the market. While not required for the provision of obstetrics, NICU backup is clearly the most desirable and best practice. For the foregoing reasons, the considerations in rule 59C-1.008(2)(e) do not weigh in favor of approval of either hospital.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Agency for Healthcare Administration enter a final order denying East Florida-DMC, Inc.’s CON Application No. 10432 and denying The Public Health Trust of Miami-Dade County, Florida, d/b/a Jackson Hospital West’s CON Application No. 10433. DONE AND ENTERED this 30th day of April, 2019, in Tallahassee, Leon County, Florida. S W. DAVID WATKINS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 30th day of April, 2019.

Florida Laws (10) 120.52120.569120.57120.595408.035408.036408.037408.039408.043408.0455 Florida Administrative Code (2) 28-106.20459C-1.008
# 8
AGENCY FOR HEALTH CARE ADMINISTRATION vs VILLA SERENA II, 18-004559 (2018)
Division of Administrative Hearings, Florida Filed:Miami, Florida Aug. 30, 2018 Number: 18-004559 Latest Update: Jan. 09, 2025
# 9
FLORIDA PSYCHIATRIC CENTERS vs. FLORIDA RESIDENTIAL TREATMENT CENTERS, 87-002046 (1987)
Division of Administrative Hearings, Florida Number: 87-002046 Latest Update: Sep. 07, 1988

Findings Of Fact The application and project On October 15, 1986, Respondent, Florida Residential Treatment Centers, Inc. (FRTC), filed a timely application with the Respondent, Department of Health and Rehabilitative Services (Department), for a certificate of need to construct a 60-bed specialty hospital to be licensed as an intensive residential treatment program for children and adolescents in Broward County, Florida. On March 11, 1987, the Department proposed to grant FRTC's application, and petitioners, Florida Psychiatric Centers (FPC) and South Broward Hospital District (SBHD), timely petitioned for formal administrative review. FRTC is a wholly-owned subsidiary of Charter Medical Corporation (Charter). Currently, Charter owns, operates or has under construction 85 hospitals within its corporate network. Of these, 13 are general hospitals, and 72 are psychiatric hospitals. Notably, Charter now operates residential treatment programs in Newport News, Virginia, Provo, Utah, and Mobile, Alabama; and, is developing such a program in Memphis, Tennessee. Within the State of Florida, Charter operates psychiatric hospitals in Tampa, Jacksonville, Fort Myers, Miami, and Ocala. In connection with the operation of these facilities, Charter has established satellite counseling centers to screen patients prior to admission and to provide aftercare upon discharge. Of 20 such centers operated by Charter, one is located in Broward County and two are located in Dade County. The facility proposed by FRTC in Broward County (District X) will treat seriously emotionally disturbed children and adolescents under the age of 18. The patients admitted to the facility will have the full range of psychiatric diagnoses, with the probable exception of serious mental retardation and severe autism. FRTC will not treat patients who present themselves with a primary substance abuse diagnosis, nor will it admit patients who are actively dangerous. This distinguishes FRTC from an acute psychiatric hospital where actively dangerous patients requiring immediate medical intervention are often admitted. The anticipated length of stay at FRTC will vary depending upon the patient's responsiveness to treatment, but is reasonably expected to range between 6 months to 2 years, with an average of 1 year. The treatment programs to be offered at FRTC will be based upon a bio- psychosocial treatment model. This model assumes that the biological component of a patient's condition has been stabilized and that psychiatric medication will be administered solely to maintain this stabilized condition. The social component of the model is designed to resolve problems in interpersonal, family and peer relationships through educational groups, psychiatric co-therapeutic groups and family group therapy. The psychological component focuses primarily on developing personal understanding and insight to guide the patient toward self-directed behavior. Among the therapies to be offered at FRTC are individual, family, recreational, group and educational. Group therapy will be designed to resolve interpersonal problems and relationships, and focuses primarily on building trust among group members. Some group therapy sessions will also cover specific issues such as sex education, eating disorders, self-image and social skills. The goal of recreational therapy will be to teach patients to play appropriately, showing them how to give, take and share, and to follow and to lead. Recreational activities will be available both on and off campus. The goal of occupational therapy will be to develop skills used in work. For a child whose work is school, this often involves using special education techniques. For teenagers, occupational therapy also develops work skills, and prepares them for vocational training or employment. Family therapy is crucial because the family is she core of child development. Families will be invited to spend days with their children at FRTC where they will learn behavioral management techniques, and participate in parent education activities and multifamily groups. The school component of the program includes development of an individualized educational plan for each child. School will be conducted 4-5 hours a day. FRTC will utilize the level system as a behavioral management tool This system provides incentives for learning responsibility for one's own behavior and for functioning autonomously. The typical progress of a patient at FRTC will be as follows. First, a team which includes a psychiatrist, social worker, psychologist and teacher will decide, based upon available information, whether admission is appropriate. If admitted, a comprehensive assessment will be conducted within 10 days, a goal- oriented treatment program will be developed for each patient, designed to remedy specific problems. Discharge planning will begin immediately upon admission. A case manager will be involved to assure that the treatment modalities are well-coordinated. Finally, FRTC will provide aftercare upon discharge. Should any FRTC patients experience acute episodes, they will be referred to acute care psychiatric hospitals with which FRTC has entered into transfer agreements. Likewise, patients who require other medical attention will be referred to appropriate physicians Consistency with the district plan and state health plan. While the local health plan does not specifically address the need for intensive residential treatment programs (IRTPs) for children and adolescents, it does contain several policies and priorities that relate to the provision of psychiatric services within the district. Policy 2 contains the following relevant priorities when an applicant proposes to provide a new psychiatric service: ... Each psychiatric inpatient unit shall provide the following services: psychological testing/assessment, psychotherapy, chemotherapy, psychiatric consultation to other hospital departments, family therapy, crisis intervention, activity therapy, social services and structured education for school age patients, and have a minimum patient capacity of 20 and a relationship with the community mental health center. Facilities should be encouraged to provide for a separation of children, adolescents, adults, and geriatric patient' where possible. Greater priority should be given to psychiatric inpatient programs that propose to offer a broad spectrum of continuous care. ... Applicants should be encouraged to propose innovative treatment techniques such as, complementing outpatient and inpatient services or cluster campuses, that are designed to ultimately reduce dependency upon short term psychiatric hospital beds. New facilities should be structurally designed for conducive recovery, provide a least restrictive setting, provide areas for privacy, and offer a wide range of psychiatric therapies. Applicants should be encouraged to offer intermediate and follow-up care to reduce recidivism, encourage specialty services by population and age, engage in research, and offer a full range of complete assessment (biological and psychological). Additionally, the local plan contains the following policies and priorities which warrant consideration in this case: POLICY #3 Services provided by all proposed and existing facilities should be made available to all segments of the resident population regardless of the ability to pay. Priority #1 - Services and facilities should be designed to treat indigent patients to the greatest extend possible, with new project approval based in part on a documented history of provision of services to indigent patients. Priority #2 - Applicants should have documented a willingness to participate in appropriate community planning activities aimed at addressing the problem of financing for the medically indigent. POLICY #4 Providers of health services are expected to the extent possible to insure an improvement of the quality of health services within the district. Priority #1 - Applicants for certificate of need approval should document either their intention or experience in meeting or exceeding the standards promulgated for the provision of services by the appropriate national accreditation organization. Priority #2 - Each applicant for certificate of need approval should have an approved Patient Bill of Rights' `as part of the institution's internal policy. POLICY #5 Specialized inpatient psychiatric treatment services should be available by age, group and service type. For example, programs for dually diagnosed mentally ill substance abusers, the elderly, and children, should be accessible to those population groups. Priority #1 - Applicants should be encouraged to expand or initiate specialized psychiatric treatment services. The FRTC application is consistent with the local health plan. FRTC's program elements and facility design are consistent with those mandated by the local plan for mental health facilities, and its proposal offers a wide range of services, including follow-up care. FRTC intends to provide a minimum of 1.5 percent of its patient day allotment to indigent children and adolescents, and will seek JCAH accreditation and CHAMPUS approval. The state health plan addresses services similar to those being proposed by FRTC, and contains the following pertinent policies and statements: Mental health services are designed to provide diagnosis, treatment and support of individuals suffering from mental illness and substance abuse. Services encompass a wide range of programs which include: diagnosis and evaluation, prevention, outpatient treatment, day treatment, crisis stabilization and counseling, foster and group homes, hospital inpatient diagnosis and treatment, residential treatment, and long term inpatient care. These programs interact with other social and economic services, in addition to traditional medical care, to meet the specific needs of individual clients. STATE POLICIES As the designated mental health authority' for Florida, HRS has the responsibility for guiding the development of a coordinated system of mental health services in cooperation with local community efforts and input. Part of that responsibility is to develop and adopt policies which can be used to guide the development of services such that the needs of Florida residents are served in an appropriate and cost effective manner. Policies relating to the development of mental health services in Florida are contained in Chapter 394 and Chapter 230.2317, F.S. The goal of these services is: '... reduce the occurrence, severity, duration and disabling aspects of mental, emotional, and behavioral disorders.' (Chapter 394, F.S.) '... provide education; mental health treatment; and when needed, residential services for severely emotionally disturbed students.' (Chapter 230.2317, F.S.) Within the statutes, major emphasis has also been placed on patient rights and the use of the least restrictive setting for the provision of treatment. 'It is further the policy of the state that the least restrictive appropriate available treatment be utilized based on the individual needs and best interests of the patient and consistent with optimum improvement of the patient's condition.' (Chapter 394.459(2)(b), F.S.) 'The program goals for each component of the network are'... 'to provide programs and services as close as possible to the child's home in the least restrictive manner consistent with the child's needs.' (Chapter 230.2317(1)(b), F.S.) Additional policies have been developed in support of the concept of a 'least restrictive environment' and address the role of long and short term inpatient care in providing mental health services for severely emotionally disturbed (SED) children. These include: 'State mental hospitals are for those adolescents who are seriously mentally ill and who have not responded to other residential treatment programs and need a more restrictive setting.' (Alcohol, Drug Abuse and Mental Health Program Office, 1982) 'Combined exceptional student and mental health services should be provided in the least restrictive setting possible. This setting is preferably a school or a community building rather than a clinical or hospital environment.' (Office of Children Youth and Families, 1984) 'Alternative, therapeutic living arrangements must be available to SED students in the local areas, when family support is no longer possible, so that they may continue to receive services in the least restrictive way possible.' (Office of Children Youth and Families, 1984) 'SED students should not be placed in residential schools or hospitals because of lack of local treatment resources, either educational or residential.' (Office of Children Youth and Families, 1984). * * * Sufficient funding for the development of residential treatment and community support is necessary if the state is to fulfill its commitment to providing services for long term mentally ill persons. These services provide, in the long run, a more humane and cost effective means of meeting the mental health needs of Florida residents. Community services have been shown to be effective in rapidly returning the majority of individuals to their productive capacity and reducing the need for costly long term, institutional mental health services. There is, therefore, a need to proceed as rapidly as possible with the development of publicly funded services in those districts which are currently experiencing problems resulting from gaps in services. * * * Services for Adolescents and Children An additional issue which has been identified as a result of increased pressures for development of hospital based programs is the need to differentiate between services for adults and those for children and adolescents. Existing policy supports the separation of services for children and adolescents from those of adults and requires the development of a continuum of services for emotionally disturbed children. The actual need for both long and short term inpatient services for children and adolescents is relatively small compared to that of adults but is difficult to quantify. Providers, however, continue to request approval for long and short term adolescent and children services as a means of gaining access to the health care market. Continued development of long and short term inpatient hospital programs for the treatment of adolescents and children is contrary to current treatment practices for these groups and is, therefore, inappropriate without local data to support the need for these services. Such development can contribute to inappropriate placement, unnecessary costs of treatment, and divert scarce resources away from alternative uses. In addition, the following pertinent goals are contained in the state health plan: GOAL 1: ENSURE THE AVAILABILITY OF MENTAL HEALTH AND SUBSTANCE ABUSE SERVICES TO ALL FLORIDA RESIDENTS IN A LEAST RESTRICTIVE SETTING. * * * GOAL 2: PROMOTE THE DEVELOPMENT OF A CONTINUUM OF HIGH QUALITY, COST EFFECTIVE PRIVATE SECTOR MENTAL HEALTH AND SUBSTANCE ABUSE TREATMENT AND PREVENTIVE SERVICES. * * * GOAL 3: DEVELOP A COMPLETE RANGE OF ESSENTIAL PUBLIC MENTAL HEALTH SERVICES IN EACH HRS DISTRICT. * * * OBJECTIVE 3.1.: Develop a range of essential mental health services in each HRS district by 1989. * * * OBJECTIVE 3.2.: Place all clients identified by HRS as inappropriately institutionalized in state hospitals in community treatment settings by July 1, 1989. RECOMMENDED ACTIONS: 3.2a.: Develop a complete range of community support services in each HRS district by July 1, 1989. * * * OBJECTIVE 3.3.: Develop a network of residential treatment settings for Florida's severely emotionally disturbed children by 1990. The FRTC application is consistent with the state health plan which emphasizes the trend toward deinstutionalization, and the importance of education, treatment and residential services for severely emotionally disturbed children and adolescents rather than the traditional approach of institutional placement. Deinstutionalization assures more appropriate placement and treatment of patients, and is less costly from a capital cost and staffing perspective. The FRTC application also promotes treatment within the state, and will assist in reducing out-of-state placements. Need for the proposed facility The Department has not adopted a rule for the review of applications for IRTPs, and has no numeric need methodology to assess their propriety. Rather, because of the paucity of such applications and available data, the Department reviews each application on a case by case basis and, if it is based on reasonable assumptions and is consistent with the criteria specified in Section 381.705, Florida Statutes, approves it. In evaluating the need for an IRTP, the Department does not consider other residential treatment facilities in the district, which are not licensed as IRTP's and which have not received a CON, as like and existing health care services because such facilities are subject to different licensure standards. Under the circumstances, the Department's approach is rational, and it is found that there are no like and existing health care services in the district. While there are no like and existing health care services in the district, there are other facilities which offer services which bear some similarity to those being proposed by FRTC. These facilities include short-term and long-term residential treatment facilities, therapeutic foster homes and therapeutic group homes. These facilities are, however, operating at capacity, have waiting lists, and do not in general offer the breath or term of service proposed by FRTC. There are also short-term and long-term psychiatric hospitals within the district that include within their treatment modalities services similar to those proposed by the applicant. The short-term facilities are not, however, an appropriate substitute for children and adolescents needing long-term intensive residential treatment and neither are the long-term facilities from either a treatment or cost perspective. Notably, there are only 15 long term psychiatric beds in Broward County dedicated to adolescents, and none dedicated to children. In addition to the evident need to fill the gap which exists in the continuum of care available to emotionally disturbed children and adolescents in Broward County, the record also contains other persuasive proof of the reasonableness of FRTC's proposal. This proof, offered through Dr. Ronald Luke, an expert in health planning whose opinions are credited, demonstrated the need for and the reasonableness of FRTC's proposed 60-bed facility. Dr. Luke used two persuasive methodologies which tested the reasonableness of FRTC's 60-bed proposal. The first was a ratio of beds per population methodology similar to the rule methodology the Department uses for short-term psychiatric beds. Under this methodology, approval of FRTC's proposal would result in 25.47 beds per 100,000 population under 18 in District X. This ratio was tested for reasonableness with other available data. Relevant national data demonstrates an average daily census of 16,000 patients in similar beds. This calculates into 24.01 beds per 100,000 at a 90 percent occupancy rate and 25.93 beds per 100,000 at an 85 percent occupancy rate. Additionally, Georgia has a category of beds similar to IRTP beds. The Georgia utilization data demonstrates a pertinent ratio of 27.05 beds per 100,000 population. The second methodology used by Dr. Luke to test the reasonableness of FRTC's proposal, was to assess national utilization data for "overnight care in conjunction with an intensive treatment program." The national census rate in such facility per 100,000 population for persons under 18 was 21.58. Multiplying such rate by the district population under 18, derives an average daily census of 52. Assuming an optimal occupancy rate of 85 percent, which is reasonable, this demonstrates a gross need for 61 IRTP beds in District X. Dr. Luke's conclusions not only demonstrate the reasonableness of FRTC's proposal, but corroborate the need for such beds within the district. This proof, together with an analysis of existing or similar services, existing waiting lists for beds at similar facilities, and the placement by the Department of 28 children from Broward County outside the county in 1986 for long-term residential treatment, demonstrates the need for, and reasonableness of, FRTC's proposal. Quality of care The parties have stipulated that Charter and its hospitals provide quality short and long term psychiatric care. All of Charter's psychiatric hospitals are JCAH accredited, and Charter will seek JCAH accreditation and CHAMPUS approval for the proposed facility. Based on Charter's provision of quality psychiatric care, its experience in providing intensive residential treatment, and the programs proposed for the Broward County facility, it is found that quality intensive residential treatment will be provided at the FRTC facility. The availability of resources, including health manpower, management personnel, and funds for capital and operating expenditures, for project accomplishment and operation. The parties have stipulated that FRTC has available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation. The proof further demonstrates that FRTC will be able to recruit any other administrative, clinical or other personnel needed for its facility. 1/ Accessibility to all residents FRTC projects the following utilization by class of pay: Insurance 66.5 percent, private pay 25 percent, indigent 1.5 percent, and bad debt 7 percent. While this is an insignificant indigent load, FRTC has committed to accept state-funded patients at current state rates. FRTC's projected utilization by class of pay is reasonable. The evident purpose of FRTC's application is to permit its licensure as a hospital under Section 395.002, Florida Statutes, and thereby permit it to be called a "hospital." If a residential treatment facility is licensed as a hospital it has a significant advantage over unlicensed facilities in receiving reimbursement from third party payors. Therefore, accessibility will be increased for those children and adolescents in need of such care whose families have insurance coverage since it is more likely that coverage will be afforded at an IRTP licensed as a "hospital" than otherwise. Design considerations The architectural design for the FRTC facility was adopted from a prototype short-term psychiatric hospital design which Charter has constructed in approximately 50 locations. This design contains the three essential components for psychiatric facilities: administration, support and nursing areas. The floor plan allows easy flow of circulation, and also allows for appropriate nursing control through visual access to activities on the floor. This design is appropriate for the purposes it will serve, and will promote quality residential care. As initially proposed, the facility had a gross square footage of 31,097 square feet. At hearing, an updated floor plan was presented that increased the gross square footage by 900 square feet to 32,045, an insignificant change. In the updated floor plan the recreational component was increased from a multipurpose room to a half-court gymnasium, an additional classroom was added, and the nursing unit was reduced in size to create an assessment unit. The updated floor plan is an enhancement of FRTC's initial proposal, and is a better design for the provision of long-term residential care to children and adolescents than the initial design. While either design is appropriate, acceptance of FRTC's updated floor plan is appropriate where, as here, the changes are not substantial. Financial feasibility As previously noted, the parties have stipulated that FRTC has the available funds for capital and operating expenses, and that the project is financially feasible in the immediate term. At issue is the long-term financial feasibility of the project. FRTC presented two pro forma calculations to demonstrate the financial feasibility of the project. The first pro forma was based on the application initially reviewed by the Department. The second was based on the proposal presented at hearing that included the changes in staffing pattern and construction previously discussed. Both pro formas were, however, based on the assumption than the 60-bed facility would achieve 50 percent occupancy in the first year of operation and 60 percent occupancy in the second year of operation, that the average length of stay would be 365 days, and that the daily patient charge in the first year of operation would be $300 and in the second year of operation would be $321. These are reasonable assumptions, and the proposed charges are reasonable. The projected charges are comparable to charges at other IRTP's in Florida, and are substantially less than those of acute psychiatric hospitals. For example, current daily charges at Charter Hospital of Miami are $481, and FPC anticipates that its average daily charge will be $500. FRTC projects its utilization by class of pay for its first year of operation to be as follows: Insurance (commercial insurance and CHAMPUS) 65.5 percent, private pay 25 percent, indigent 1.5 percent, and bad debt 8 percent. The projection by class of pay for the second year of operation changes slightly based on the assumption that, through experience, the bad debt allowance should decrease. Consequently, for its second year of operation FRTC projects its utilization by class of pay to be as follows: Insurance (commercial insurance and CHAMPUS) 66.5 percent, private pay 25 percent, indigent 1.5 percent, and bad debt 7 percent. These projections of utilization are reasonable. FRTC's pro forma for the application initially reviewed by the Department demonstrates an estimated net income for the first year of operation of $97,000, and for the second year of operation $229,000. The updated pro forma to accommodate the changes in staffing level and construction, demonstrates a $102,000 loss in the first year of operation and a net income in the second year of operation of $244,000. The assumptions upon which FRTC predicated its pro formas were reasonable. Accordingly, the proof demonstrates that the proposed project will be financially feasible in the long-term. Costs and methods of construction The estimated project cost of the FRTC facility, as initially reviewed by the Department, was $4,389,533. The estimated cost of the project, as modified at hearing, was $4,728,000. This increase was nominally attributable to the change in architectural design of the facility which increased the cost of professional services by approximately $7,500 and construction costs by $139,322. Of more significance to the increased cost of the project was the increase in land acquisition costs which raised, because of appreciation factors, from $750,000 to $1,000,000. The parties stipulated to the reasonableness of the majority of the development costs and most of the other items were not actively contested. Petitioners did, however, dispute the reasonableness of FRTC's cost estimate for land acquisition and construction supervision. The proof supports, however the reasonableness of FRTC's estimates. FRTC has committed to construct its facility south of State Road 84 or east of Interstate 95 in Broward County, but has not, as yet, secured a site. It has, however, allocated $1,000,000 for land acquisition, $200,281 for site preparation exclusive of landscaping, and $126,000 for construction contingencies. The parties have stipulated to the reasonableness of the contingency fund, which is designed as a safety factor to cover unknown conditions such as unusually high utility fees and unusual site conditions. Totalling the aforementioned sums, which may be reasonably attributable to land acquisition costs, yields a figure of $1,326,281. Since a minimum of 6 acres is needed for project accomplishment, FRTC's estimate of project costs contemplates a potential cost of $221,047 per acre. In light of the parties' stipulation, and the proof regarding land costs in the area, FRTC's estimate for land acquisition costs is a reasonable planning figure for this project. FRTC budgeted in its estimate of project costs $6,000 for the line item denoted as "construction supervision (Scheduling)." Petitioners contend that construction supervision will far exceed this figure, and accordingly doubt the reliability of FRTC's estimate of project costs. Petitioners' contention is not persuasive. The line item for "Construction supervision (Scheduling)" was simply a fee paid to a consultant to schedule Charter's projects. Actual on site supervision will be provided by the construction contractor selected, Charter's architect and Charter's in-house construction supervision component. These costs are all subsumed in FRTC's estimate of project cost. FRTC's costs and methods of proposed construction, including the costs and methods of energy efficiency and conservation, are reasonable for the facility initially reviewed by the Department and the facility as modified at hearing. The petitioners FPC, a Florida partnership, received a certificate of need on May 9, 1986, to construct a 100-bed short term psychiatric and substance abuse hospital in Broward County. At the time of hearing, the FPC facility was under construction, with an anticipated opening in May 1988. Under the terms of its certificate of need, the FPC facility will consist of 80 short-term psychiatric beds (40 geriatric, 25 adult, and 15 adolescent) and 20 short-term substance abuse beds. Whether any of the substance abuse beds will be dedicated to adolescent care is, at best, speculative. The principals of FPC have opined at various times, depending on the interest they sought to advance, that 0, 5, or 20 of such beds would be dedicated to adolescent care. Their testimony is not, therefore, credible, and I conclude that FPC has failed to demonstrate than any of its substance abuse beds will be dedicated to adolescent care and that none of its treatment programs will include children. As a short term psychiatric hospital, FPC is licensed to provide acute inpatient psychiatric care for a period not exceeding 3 months and an average length of stay of 30 days or less for adults and a stay of 60 days or less for children and adolescents under 18 years. Rule 10-5.011(1)(o), Florida Administrative Code. While its treatment modalities and programs may be similar to those which may be employed by FRTC, FPC does not provide long-term residential treatment for children and adolescents and its services are not similar to those being proposed by FRTC. Notably, FPC conceded that if the patients admitted by FRTC require treatment lasting from 6 months to 2 years, there will be no overlap between the types of patients treated at the two facilities. As previously noted, the proof demonstrates that the length of stay at the FRTC facility was reasonably estimated to be 6 months to 2 years, with an average length of stay of 1 year. Under the circumstances, FPC and FRTC will not compete for the same patients. As importantly, there is no competent proof that FRTC could capture any patient that would have been referred to FPC or that any such capture, if it occurred, would have a substantial impact on FPC. Accordingly, the proof fails to demonstrate that FPC will suffer any injury in fact as a consequence of the proposed facility. SBHD is an independent taxing authority created by the legislature. Pertinent to this case, SBHD owns and operates the following facilities in Broward County: Memorial Hospital of Hollywood, 1011 North 35th Avenue, Hollywood, Florida, and Memorial Hospital Share Program, 801 S.W. Douglas Road, Pembroke Pines, Florida. Memorial Hospital of Hollywood is a general acute care hospital, with 74 beds dedicated to short-term psychiatric care. These beds are divided between three units: two closed units for acute care (42 beds) and one open unit (32 beds). There is no unit specifically dedicated to the treatment of adolescents, and Memorial does not admit any psychiatric patient under the age of 14. When admitted, adolescents are mixed with the adult population. From May 1987 through January 1988, Memorial admitted only 5-10 adolescents (ages 14-18). Their average length of stay was 12-14 days. Memorial Hospital Share Program is a 14-bed inpatient residential treatment program for individuals suffering from chemical dependency. No patient under the age of 18 is admitted to this program, which has an average length of stay of 27 days. SBHD contends that its substantial interests are affected by this proceeding because approval of FRTC's facility would result in the loss of paying psychiatric and residential treatment patients that would erode SBHD's ability to provide services to the indigent, and would, due to a shortage of nursing, recreational therapy and occupational therapists who are skilled and trained in the care of psychiatric patients, affect the quality of care at its facility and increase costs for recruiting and training staff. Due to the paucity of competent proof, SBHD's concerns are not credited, and it has failed to demonstrate that its interests are substantially affected by these proceedings. Succinctly, SBHD offered no proof concerning any staffing problems it was encountering and no proof of any disparity that might exist between wages and benefits it offers its employees and those to be offered at the FRTC facility. In sum, it undertook no study from which it could be reasonably concluded that the FRTC facility would adversely impact its staffing or otherwise increase the cost of recruiting and training staff. Likewise, SBHD undertook no study and offered no credible proof that the FRTC facility would adversely impact it financially. In fact, the FRTC facility will not treat the same patient base that is cared for by SBHD.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that FRTC's application for certificate of need, as updated, be granted, subject to the special condition set forth in conclusions of law number 12. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 7th day of September, 1988. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of September, 1988.

Florida Laws (4) 120.5727.05394.459395.002