Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that application number 07256-F be APPROVED subject to the special conditions set forth above. DONE AND ORDERED this 15th day of July 1987, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 904/488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of July 1987.
The Issue At issue in this proceeding is whether certain development orders issued by Monroe County to Homeowners, Ocean Reef Club and Key Largo Foundation (Applicants) for a project that would ultimately result in the construction of a flushing canal in the Ocean Reef Club development on north Key Largo are consistent with the Monroe County comprehensive plan and land development regulations.
Findings Of Fact The parties Petitioner, Department of Community Affairs (Department), is the state land planning agency charged with the responsibility of administering and enforcing the provisions of Chapter 380, Florida Statutes, and all rules promulgated thereunder. Section 380.031(18) and 380.032(1), Florida Statues. Respondent, Monroe County, is a local government within the Florida Keys area of Critical State Concern designated by Section 380.0552, Florida Statutes, and is responsible for the implementation of, and the issuance of development orders that are consistent with, the Monroe County comprehensive plan and land development regulations, as approved and adopted in Chapters 9J-14 and 28-20, Florida Administrative Code. Respondents, Homeowners, Ocean Reef Club and Key Largo Foundation (Applicants), are the owners of real property in the Ocean Reef and Harbour Course subdivisions, Key Largo, Monroe County, Florida; properties that are located within that part of Monroe County designated as an area of Critical State Concern. The Applicants have sought the development orders (permits) at issue in this proceeding incident to their 8-year quest to achieve regulatory approval to initiate a project that would restore the water quality of Dispatch Creek to Class III water standards. Background The site of the proposed project, the present terminus of Dispatch Creek, is located within the Ocean Reef Club development on north Key Largo. That development is bordered on the east by the Atlantic Ocean and John Pennekamp Coral Reef State Park, on the north by Biscayne National Park, and on the west by the Biscayne Bay/Card Sound Aquatic Preserve. Currently, the development at the Ocean Reef Club includes a number of canals and boat basins, an airstrip; three 18-hole golf courses, a 174-slip marina capable of docking vessels in excess of 100 feet, and extensive residential and-commercial uses. In the mid-1970's, Dispatch Creek was a natural, albeit shallow, waterbody that was able to maintain, through natural tidal actions, water quality standards. However, in 1977 Ocean Reef Club, under permits issued by the Department of Environmental Regulation (DER) in the mid-1970's excavated the creek to new depths to create a navigable channel and extended its length beyond its natural contours. When completed, the creek was converted from a natural waterbody, that could maintain water quality standards through natural tidal action, into a dead-end system, that could not maintain such standards through natural processes along the course of its extended terminus. 1/ Over time, the water quality of Dispatch Creek from its approximate midpoint to its dead-end terminus has steadily declined. The cause of this decline is reasonably attributable to the biochemical oxygen demand placed on the creek by the continuous input of detritus from mangroves, which boarder the creek on the east and to a lesser extent on the west, and the length of the channel, coupled with the dead-end basin surrounding an island, which has assured the continued decline of water quality due to poor water circulation. As a consequence, the creek, as a habitat, has been altered from an oxygen rich system supportive of aerobic life to an oxygen poor system supportive of anaerobic life. This has evidenced itself through algae blooms, the intermittent emission of hydrogen sulfide gas, and a change in water clarity to that of a "coffee au lait" color. Currently, a significant portion of Dispatch Creek is devoid of aerobic life, and unless its condition is reversed it could not support aerobic marine organisms in the future. /2 Today, conditions in portions of Dispatch Creek fail to meet DER standards. DER regulations establish the dissolved oxygen (DO) standard to be not less than five milligrams per liter in a 24-hour period, and never less that four milligrams per liter. The DO Standard is currently violated in Dispatch Creek beginning at the mid point of the creek to its terminus. At its terminus, DO levels are chronically below one milligram per liter. Additionally, DER nutrient standards prohibit the alteration of nutrient concentrations of a body of water so as to cause an imbalance in natural populations of aquatic flora or fauna. Here, the high nutrient levels of Dispatch Creek resulting from the mangrove detritus and lack of circulation has, as heretofore noted, caused the natural aquatic flora and fauna to be replaced by anaerobic life. As a consequence of the changes in water quality that had occurred in Dispatch Creeks the Applicants have, over the course of the past eight years, sought approval from various regulatory authorities, including DER and Monroe County, of a plan to improve the water quality in Dispatch Creek. Such approval has been garnered from DER, and Monroe County's approval is at issue in this proceeding. The DER permit On February 7, 1986, the Applicants received approval from DER for a permit to construct a flushing canal from the terminus of Dispatch Creek to the Atlantic Ocean. That permit authorized the Applicants: To construct a "flushing canal" between the dead end of Dispatch Creek Waterway and the Atlantic Ocean by: excavating approximately 13,000 cubic yards to create a canal approximately 3000 ft. long by 20 ft. wide with a bottom elevation of 6 ft. Mean Low Water; placing three 6 ft. by 6 ft. by 380 ft. box culverts in the canal alignment at the basin end; placing tidal actuated flap gates on the basin end of the culverts in a manner which will allow the basin to intake water from the flushing canal on incoming tides while preventing discharge into the flushing canal on outgoing tides; placing 5 pilings across the canal at it's juncture with the Atlantic Ocean to prevent navigation in the canal; and creating a 12,900 sq. ft. mangrove mitigation area by excavating approximately 1,450 cu. yds. from a spoil area to create an area with an elevation of +1.4 Ft. NGVD which will be planted with red mangroves. DER was, in evaluating the application pending before it, charged with the duty to apply, enter alia, the criteria of the 1984 Warren Henderson Wetlands Act, Section 403.918(2), Florida Statutes, as well as Chapters 17-3 and 17-4, Florida Administrative Code. Based on DER's decision to issue its permit, it is reasonable to conclude that DER, within its permitting jurisdiction, concluded that construction of the proposed circulation channel would not lower ambient water quality, and would not significantly degrade Outstanding Florida Waters (OFW), including those of John Pennekamp Coral Reef State Park. As heretofore noted, the Department does not contend that the subject project will violate any specific criteria within DER's Chapter 403, Florida Statutes, permitting jurisdiction. The Monroe County permits On July 19, 1989, Monroe County issued to the Applicants the building permit, excavation permit, and land clearing permit (development orders), each numbered 8930001680, at issue in these proceedings. As permitted, the project proposed by the Applicants is designed to improve the water quality of Dispatch Creek, particularly in the vicinity of its dead-end terminus, and consists of two phases. Phase I contemplates the installation and operation of an aeration system for at least one year, which will extend from the dead-end terminus of Dispatch Creek toward its midpoint, as well as a water quality monitoring program, until such time as the water quality of the entire creek comports with that of adjacent Class III waters. Should the Applicants be successful in Phase I, they would then be authorized to proceed with Phase II, which would allow the construction of the flushing canal contemplated by the DER permit. As approved by Monroe County, Phase I would consist of the installation of an aeration system around the island, located at the terminus of Dispatch Creek, and in the canal, as well as the suction dredging of loose sediments in the upper reaches of Dispatch Creek. The system would consist of fifteen microporus diffuser/aerators producing approximately 5 CFM per unit, and would be anchored near the bottom to maximize the introduction of dissolved oxygen into the anaerobic water and to optimize water movement. Operation of such system, coupled with the introduction of aerobic bacteria, will shortly reduce the concentration of hydrogen sulfide dissolved in the water, reduce the concentration of ionized sulfides in solution, retard the growth and propagation of anaerobics in the benthic layer, and activate the growth and propagation of aerobics in all strata. As a consequence, over time, water clarity will improve, which will allow the penetration of sunlight into the benthos. This illumination will spawn the growth of photosynthetic bacteria, as well as phytoplankton, which will aid in the continued aerobic cleansing of the water and bottom sediments. In all, installation and operation of the aeration system, which has proven successful at other locations, should, over time, restore the waters of Dispatch Creek to Class III standards, without any adverse impacts to adjacent waters or the park. While operation of the aeration system will, over time, restore the waters of Dispatch Creek to Class III standards, the perpetual maintenance of such system would be energy intensive and expensive. for this reason, the Applicants have proposed the Phase II canal, which would maintain, through natural tidal processes, water quality standards within the creek. The canal permitted by Monroe County under Phase II is consistent in all respects with the DER permit except the Monroe County permits require that the canal be sited 20 feet landward of the alignment permitted-by DER into previously scarified uplands. So aligned, the canal would begin at the landward terminus of Dispatch Creeks run easterly within the rear lot lines of at least 15 lots within Harbour Course South subdivision, a platted subdivision, pass through a fringe of red and black mangroves fronting the ocean, and terminate approximately 100 feet seaward of the mean high water line (MHWL) within the boundaries of John Pennekamp State Park. At the point where the canal would join with Dispatch Creek, three 6 foot by 6 foot by 380 foot box culverts would!! be installed with one-way tidal activated flap gates, which would permit waters from the Atlantic to enter Dispatch Creek on a rising tide, but would preclude an exchange of waters from Dispatch Creek on a falling tide. Through such design, sufficient mix and force will be exerted within the waters of Dispatch Creek to maintain Class III water quality standards by natural circulation, and to return the habitat offered by the creek to an oxygen rich system capable of supporting aerobic life. While construction of the canal would be beneficial, by restoring the waters: of Dispatch Creek to Class III standards, it is not without cost to the environment. As aligned, the canal, although predominately within previously cleared or scarified uplands, will require excavation through several types of habitat that are either undisturbed or reestablished, including undisturbed buttonwood association, salt marsh, hardwood hammock, transitional habitat, mangroves and submerged lands, and will require the removal of approximately one-tenth of an acre of red and black mangroves, a species of special concern, as well as a number of mahogany trees, twisted air plants, prickly pear cactus and barpar cactus, which are threatened species. Its construction would likewise sever the uplands from the adjacent transitional and wetland areas that traditionally buffer, insulate and protect nearshore waters from runoff from upland areas. Construction of the canal should not, however, adversely impact any threatened or endangered animal species since the proposed alignment is currently a poor habitat for threatened or endangered species, such as the Key Largo woodrat, that may reside in the area, and there is currently no threatened or endangered animal species inhabiting the site. This is not, however, to suggest that the site would not support such species in the future, provided that existing habitat is permitted to continue its progress towards reestablishment. To mitigate the loss of habitat types, the Monroe County permit provides: The agreed mitigation for the loss of all rare and/or endangered habitat types located within the area impacted by the dredging shall be carried out prior to initiation of the dredge project. This shall be based on existing vegetation surveys and an assessment of species currently located within the confines of the project area. Prior to initiation of any dredge activity, a formal inventory of the project site shall be made and a one-to-one replacement program (baked on species rarity or level of endangerment) shall be established and agreed upon. Such an agreement will include defining an appropriate site and the number and type of trees, as well as a maintenance plan for the agreed upon area. Additionally, the DER permit addresses the loss of mangroves, by requiring the establishment of a 12,900 square foot mangrove mitigation area. Under the facts of this case, the mitigation proposed would, assuming the propriety of such development under the Monroe County comprehensive plan and land development regulations, address the loss of habitat types occasioned by development of the proposed canal. To assure that water quality within Dispatch Creek comports with Class III standards before the canal is dug, and that the creek maintains such standards following construction, the Monroe County permits establish a water quality monitoring program. During the first year, samples will be taken and tests performed on a weekly basis for pH, DO, turbidity, Secchi Disc, temperature, and sulfite; on a biweekly basis for total bacterial count and composition; on a monthly basis for total nitrogen and phosphate; on a quarterly basis for: macro-invertebrates and macrophytes; and on a semiannual basis for heavy metals and pesticides. During the second yearn biweekly testing will be done for DO, temperature, hydrogen sulfide, turbidity and Secchi Disc; quarterly testing for total nitrogen and phosphate, macro- invertebrates, and macrophytes; and, annual testing for heavy metals and pesticides. After the second year, monthly tests will be done for DO, temperature, hydrogen sulfide, turbidity, and Secci Disc; quarterly tests for total nitrogen and phosphate, as well as macro- invertebrates; and annual tests for heavy metals and pesticides. Should the water quality of the creek fail to maintain Class III standards following construction of the canal, the Monroe County permit contains the following special condition: The water quality monitoring program shall be maintained to assess the quality of water in Dispatch Creek subsequent to the dredge project completion. If at any time the water quality fails to meet the standards established by this permit, the one way flushing valve shall be closed by the applicant, and in applicant's failure to do so, by the County. The applicant assumes all costs of closing said valve, whether closed by applicant or the County. Aeration, aid/or other means at the discretion of the applicant, shall be utilized to reestablish quality. The valve shall not be reopened until the water quality standard is met. The purpose of the foregoing condition, as well as the requirement that the waters of Dispatch Creek meet Class III standards before the canal can be dug, is to assure that operation of the canal will not lower ambient water quality within the Outstanding Florida Waters of John Pennekamp Coral Reef State Park, and thereby protect the park from any adverse impacts associated with the improved circulation of the creek. John Pennekamp Coral Reef State Park is a unique and world-renowned resource, attracting millions of visitors each year. At least fifty percent of the activities engaged in by visitors to the park are water-related, including fishing, observational diving and boating. Any degradation of the ambient quality of those waters would be contrary to DER's rules promulgated under Chapter 403, Florida Statutes, and could adversely impact the natural biota of the park, with a corresponding reduction in the number of visitors to the park and revenues contributed by those visitors to the local economy. Here, the proof demonstrates, consistent with DER's prior permitting, that the subject project, built as proposed, would not lower the ambient water quality of adjacent waters through the discharge of pollutants, and therefore would not adversely affect the park. If anything, the Monroe County permits, with one exception to be discussed infra, offer stronger assurances than the DER permit that adverse impacts will not occur. Notably, under such permits the Applicants must first bring the water quality of the Creek up to Class III standards before the canal can be dug. If the Applicants are ssuccessful at that phase of the project, there will not be excessive nutrient loading within the creek, and the detritus that may thereafter be removed from the creek by improved circulation would not adversely affect water quality or the park. Currently, there are no heavy metals in the sediments or water column of the creek which are at levels above those found naturally, and no pesticides or toxic organics. In sum, there is no basis to conclude, based on the record, that-there is any substance within the waters or sediments of Dispatch Creek that would, upon the waters achieving Class III standards, lower the amient quality of adjacent waters or adversely impact the park. /4 Ostensibly, as an added measure of protection to adjacent waters, the Monroe County permits contain a condition, with which the Applicants concur, that should the waters of Dispatch Creek fail to maintain Class III standards following construction of the canal, the one-way tidal actuated flap gates will be closed. That condition, a noted supra, provides: If at any time the water quality [of the creek] fails to meet the standards established by this permit, the one way flushing valve shall be closed by the applicant, and in the applicant's failure to do so, by the County. The applicant assumes all costs of closing by applicant or the County. Aeration, and/or other means at the discretion of the applicant, shall be utilized to reestablish quality. The valve shall not be reopened until the water quality standards is met. The foregoing condition presumes to address the possibility that should the proposed project fail to function as expected by the experts, as did the current Dispatch Creek fail to function as expected, that such failure will no result in an adverse impact to adjacent waters or the park. In this regard, it is worthy of note that DER's approval of the extension of Dispatch Creek to create a 7,200 foot dead-end canal in the mid-flush the pollutants from the canal into the park. The Applicants presented persuasive testimony, however, through their 1970's was, based on current knowledge, an error, and that today no dead-end system would be approved in excess of soon feet. Monroe County's condition, while preventing the discharge of degraded waters from Dispatch Creek to the park upon closure of the one way flushing valves, fails to address, however, the adverse impacts that could result from its closure. By closure of the valves, the flushing canal would be instantly converted into a 3,000-foot dead-end canal, and would suffer the same water quality problems as similar systems, with probable adverse effects to adjacent waters and the park. Accordingly, so as not to compound the existing error occasion by the extension of Dispatch Creek in the mid-1970's, prudence would dictate a proviso that, if the valves are shut, appropriate monitoring will occur within the waters of the flushing canal to detect any significant degradation of water quality, and that should such degradation pose a threat to adjacent waters or the park, that the Applicants be required, at their expense, to restore promptly the water quality within the flushing canal to Class III standards or restore the area to its present condition. Consistency of the proposed project with the Monroe County comprehensive plan and land development regulations Lack of plat approval As heretofore noted, the proposed canal would begin at the landward terminus of Dispatch Creek and run easterly within the rear lot lines of at least 15 lots in Harbour Course South subdivision, a platted subdivision, before it passed through fringing mangroves and terminated in the Atlantic Ocean. Currently, the final recorded plats of Harbour Course South subdivision do not reflect the proposed canal, as mandated by Section 177.091(15), Florida Statutes, and the Applicants have not sought to amend the plat to include the proposed canal. Pertinent to this case, the Monroe County Code (MCC), the land development regulations, /5 provides: Sec. 9.5-1. Purpose. It is the purpose of this chapter, the Land Development Regulations, to establish the standards, regulations, and procedures for review and approval of all proposed development of property in unincorporated Monroe County, and to provide a development review process what will be comprehensive, consistent and efficient in the implementation of the goals, policies and standards of the comprehensive plan . . . Sec. 9.5-2. Applicability. General Applicability: The provisions of this chapter shall apply to all land in unincorporated Monroe County. All development of whatever type and character, whether permitted as of right or as a conditional use, shall comply with the development standards and the environmental design criteria set forth in article VII hereof. No development shall be undertaken without prior approval and issuance of a development permit under the provisions of this chapter and other applicable laws and regulations. Sec. 9.5-81. Plat approval and recording required. * * * No building permit, 6/ except for single family detached dwellings and accessory uses thereto, shall be issued for the construction of any building, structure or improvement unless a final plat has been approved in accordance with the provisions of this division and recorded for the lot on which the construction is proposed. * * * (e) If a plat has been previously approved and recorded, technical or minor changes to the plat may be approved by the director of planning. All other changes shall be considered in accordance with the provisions of this Division. Sec. 9.5-94. Amendment of a recorded final plat. An amendment of a recorded final plat or portion thereof shall be accomplished in the same manner as for approval of the plat. Here, the subject permits were issued contrary to the foregoing provisions of the MCC because there was no final plat of record approving the canal as to each affected lot. While the Applicants offered proof, if credited, that the existing plat could be amended to include the canal as a "minor change" upon approval of the Director of Planning, it is noteworthy that no such approval has been obtained. More importantly, it is found that a change in the existing plat to include the canal would not constitute a "technical or minor change," and that formal amendment of the plat would be required. 7/ The provision of the MCC dealing with plat approval, provide a comprehensive scheme to assure, among other things, than the proposed plat is consistent with the purposes, goals and objectives of the comprehensive plan, the development regulations, and state laws, as well as affording an opportunity for public input. Of import here, the MCCs provide: Sec. 9.5-82. General Standards for Plat Approval. No preliminary or final plat shall be approved unless the plat is consistant with the purposes, goals and objectives of this plan, this chapter, applicable provisions of state law, the provisions governing the development of land set forth in article VII, and the procedures set forth in this article. Sec. 9.5-83. Preliminary Plat Approval. Generally. All applicants for approval of a plat involving five (5) or more lots shall submit a preliminary plat for approval in accordance with the provisions of this section. Application. An application for preliminary approval shall be submitted to the development review coordinator in accordance with the provisions of this section, accompanied by a nonrefundable fee as established from time to time by the board of county commissioners. The application shall contain the information required on a form provided by the director of planning. Staff Review. After a determination that the application for preliminary plat approval is complete under the provisions of section 9.5-44, the development review coordinator shall submit the application to the development review committee, which shall prepare a recommendation and report for the commission. Public Hearing and Action by the Planning Commission. The planning commission shall conduct a public hearing on an application for preliminary plat approval of a subdivision involving five (5) or more lots, in accordance with the requirements of sections 9.5-46 and 9.5-47. The commission shall review such applications, the recommendation of the development review committee, and the testimony at the public hearing, and shall recommend granting preliminary plat approval, granting approval subject to specified conditions, or denying the application at its next meeting following submittal of the report and recommendation of the development review committee. Effect of Approval of Preliminary Plat. Approval of a preliminary plat shall not constitute approval of a final plat or permission to proceed with development. Such approval shall constitute only authorization to proceed with the preparation of such documents as are required by the director of planning for a final plat. Sec. 9.5-84. Final Plat Approval. Generally. All applicants for approval of a plat shall submit a final plat for approval in accordance With the provisions of this section. Application. It shall be the responsibility of the developer to complete, have in final form, and submit to the development review coordinator for final processing the final plat, along with all final construction plans, required documents, exhibits, legal instruments to guarantee performance, certificates properly executed by all required agencies and parties as required in this article, and the recording fee, and any other documents or information as are required by the director of planning. After receipt of a complete application for final plat approval, as determined in accordance with section 9.5-44, development review coordinator shall submit the application and accompanying documents to the development review committee. Review and action by Development Review Committee. The development review committee shall review all applications for final plat approval. b. For a final plat for subdivision involving five (5) or more lots, if the plat conforms to the approved preliminary plate and the substantive and procedural requirements of this chapter, at its next regular meeting or as soon as practical after receipt of a complete application, the development reviews committee shall recommend to the planning commission approval of the final plat or approval with conditions. If the committee finds that the plant does not substantially conform to the approved preliminary plat or the substantive and procedural requirements of these regulations, the committee shall recommend denial, specifying the area(s) of nonconformity. Review and Action by the Planning Commission. The planning commission shall review all applications far final plat approval involving five (5) or more lots and the recommendation of the development review committee. If the commission finds that the final plat conforms to the approved preliminary plat and the substantive and procedural requirements of this chapter, the commission shall recommend to the board of county commissioners approval of the final plat, or approval with specified conditions, and shall submit a report and written findings in accordance with section 9.5-47. Public Hearing by the Board of Country Commissioners. The board off county commissioners shall conduct a public hearing on all applications for final plat approval involving five (5) or more lots in accordance with the procedures of section 9.5-46C. Action by the Board of County Commissioners. For proposed subdivisions involving five (5) or more lots the board of county commissioners shall review the application, the recommendations of the development review committee and the planning commission, and the testimony at the public hearing, and shall grant final plat approval, grant approval subject to specified conditions, or deny the application, in accordance with the provisions of section 9.5-47. Sec. 9.5-90.Maintenance of Private Improvements. If any plat of subdivision contains streets, easements, or other improvements to be retained for private use, the final plat for recordation shall indicate to the satisfaction of the director of planning and the county attorney the method or entity by which maintenance of the private improvements shall be performed. As a consequence of Monroe County's failure to comply with the provisions of its regulations which require final plat approval before a building permit may be issued, there has been no review by the Development Review Committee, no public hearing conducted by the Planning Commission, no recommendation of the Planning Commission, and no public hearing before the County Commissioners on the propriety of amending the subject plat to permit the proposed construction, or a resolution, through the plat approval process, as to whether the proposed canal is consistent with, inter alia, the purposes, goals, and objectives of the Monroe County comprehensive plan, as mandated by section 9.5-82(a), MCC. As importantly, where, as here, the proposed canal is to be retained for private use, there is no indication on the recorded plat, 4s required by MCC 9.5-90, of the method or entity by which maintenance of the canal shall be performed. Notably, the property through which the canal will be constructed is not owned by any of the Applicants but, rather, by Driscoll Properties , with whom the Applicants state they have an agreement to permit construction. 8/ Open space requirements and environmental design criteria Pertinent to this case, the MCC further provides: Sec. 9.5-3. Rules of construction. In the construction of the language of this chapter, the rules set out in this section shall be observed unless such construction would be inconsistent with the manifest intent of the board of commissioners as expressed in the Monroe County Comprehensive Plan or an element or portion thereof, adopted pursuant to chapters 163 and 380, Florida Statutes (1985). The rules of construction and definitions set out herein shall not be applied to any section of these regulations which shall contain any express provisions excluding such construction, or where the subject matter or context of such section is repugnant thereto. (a) Generally: All provisions, term , phrases and expressions contained in this chapter shall be liberally construed in order that the true intent and meaning of the board of county commissioners may be fully carried out. Terms used in this chapter, unless otherwise specially provided, shall have the meanings prescribed by the statutes of this state for the same terms. In the interpretation and application of any provision of this chapter, it shall be held to be the minimum requirement adopted for the promotion of the public health, safety, comfort, convenience and general welfare. Where any provision of this chapter imposes greater restrictions upon the subject matter than a general provision imposed by the Monroe County Code or another provision of this chapter, the provision imposing the greater restriction or regulation shall be deemed to be controlling . . (Emphasis added) Sec. 9-804 (MCLDR) Open space requirements. No land shall be developed, used or occupied such that the amount of open space on the parcel proposed for development is less than the following ratios, nor shall open space be cleared or otherwise disturbed including ground cover, understory, mid-story, and canopy vegetation. All such required areas shall be maintained in their natural condition. The amount of open space required on any parcel for development shall be determined according to each land type and no development activity within any individual land type shall exceed the open space ratio for that land type. Land Type on Existing Open Space Conditions Map Ratio Open Waters 1.00 Mangrove and Freshwater 1.00 Wetlands Salt Marsh and Buttonwood .80 Associations .85 High Hammock (High Quality) .80 High Hammock (Moderate Quality) .60 High Hammock (Low Quality) . 4 Low Hammock (High Quality) .80 Low Hammock (Moderate Quality) .60 Low Hammock (Low Quality) . 4 Palm Hammock .90 Cactus Hammock .90 Pinelands (High Quality) .80 Pinelands (Low Quality) .60 Beach Berm .90 Disturbed . 2 Disturbed with Hammock . 2 Disturbed with Salt Marsh and Buttonwood . 2 Disturbed Beach/Berm . 2 Disturbed with Exotics . 2 Disturbed with Slash Pines . 2 Offshore Islands . 9 (Emphasis added) Sec. 9.5-345. Environmental design criteria. No land, as designated on the existing conditions map and analyzed in accordance with the standards in sections 9.5-339 and 9.5-340, shall be developed, used ~re occupied except in accordance with the following criteria unless the county biologist recommends an authorized deviation from the following criteria in order to better serve the purpose and objectives of the plan and the director of planning or planning commission approves the recommendation as a minor or major conditional use. No recommendation for an authorized deviation from these environmental design criteria shall be made unless the county biologist makes written findings of fact and conclusions of biological opinion which substantiate the need and/or benefits to be derived from the authorized deviation. (m) Mangroves and Submerged Lands: Except as provided in subsection (3), only piers, docks, utility pilings and walkways shall be permitted on submerged lands and mangroves; All structures on any submerged lands and mangroves shall be designed, located and constructed such that: All structures shall be constructed on pilings or other supports; Bulkheads and seawall shall be permitted only to stabilize disturbed shorelines or to replace deteriorated existing bulkheads and seawalls; No structure shall be located on submerged land which is vegetated with sea grasses except as is necessary to reach waters at least four (4) feet below mean low level for docking facilities. (Emphasis added) From the foregoing regulations it is apparent that Monroe County has accorded mangroves the highest of protections. The regulations mandate a 100 percent open space ratio in such areas, and preclude any clearing or other disturbance of such areas. The only exception provided by the regulators, absent approval of an application for a minor or major conditional use, is for the construction of piers, docks, utility pilings and walkways, and then only when such structures are constructed on pilings or other supports to minimize their impact. Here, the proposed development, "permitted as of right" and not as a minor or major conditional use, fails to comply with the Monroe County land development regulations because it will result in the elimination of an existing mangrove community. In addition to the environmental design criteria established for mangroves by section 9.5-345, discussed supra, that section likewise establishes-specific performance standards for the development of any parcel (lot) depending on the habitat type, and where mixed habitat is encountered, requires that development occur on the least sensitive portions of the parcel. Here, while the Applicants did address the habitat types encountered along the canal alignment, the record fails to address the habitat types encountered on each of the platted lots through which the canal will run. Consequently, the Applicants failed to demonstrate that development of those lots, by construction of a canal within their rear boundary, would be consistent with the open space ratios mandated by section 9-804, MCLDR, or the environmental design criteria mandated by section 9.5-345, MCC. C. The Monroe County land development regulations further and implement the Monroe County comprehensive plan. The foregoing land development regulations were adopted by Monroe County, as well as approved by the Department and adopted by the Administrations Commission, to further and implement the standards, objectives and policies of the Monroe County comprehensive plan. That plan evidences a strong commitment to the protection, maintenance, and improvement of the Florida Keys environment. In this regard, the comprehensive plan provides: Sec. 2-104. Nearshore Waters The Florida Keys are dependent nearshore water quality for their environmental and economic integrity. The heart of the Florida Keys economy, the means by which Monroe County exists as a civil and social institution, is based on its unique, oceanic character. If nearshore water quality is not maintained, then the quality of life and the economy of Monroe County will be directly and immediately impacted. OBJECTIVES 1. To protect, maintain and, where appropriate, improve the quality of nearshore waters in Monroe County. POLICIES 1. To prohibit land uses that directly or indirectly degrade nearshore water quality. To prohibit the development of water dependent facilities, including marinas, at locations that would involve significant of the biological character of submerged lands. To limit the location of water- dependent facilities at locations that will not have a significant adverse impact on offshore resources of particular importance. For the purposes of this policy, offshore resources of particular importance shall mean hard coral bottoms, habitats of state or federal threatened and endangered species, shallow water areas with natural marine communities with depths at mean low tide of legs than four (4) feet, and all designated Aquatic Preserves under Ch. 258.39 et seq. the Florida Statutes. To limit the location of docking facilities to areas which have adequate circulation and tidal flushing. To protect wetland and transitional areas that serve to buffer, insulate and protect nearshore waters from run- off from upland areas. To prohibit the discharge of any pollutant directly or indirectly into nearshore waters. For the purposes of this policy, indirect discharge into nearshore waters shall include surface runoff, surface spreading or well injection of any effluent that does not meet state or federal standards for point and non-point discharges. To monitor nearshore water quality to ensure that growth and envelopment is not degrading nearshore water quality. To encourage the rehabilitation of canals and other water bodies where water quality has deteriorated. Sec. 2-105. Wetlands and Associated Systems Wetlands are an essential element of the Florida Keys and they play several vital roles. Wetlands serve as principal habitats for a wide variety of plants and animals, including juvenile forms of several commercially-exploited species of seafood. In addition, wetland plants play an important role in pollution control through nutrient uptake, and in primary production control through nutrient uptake, and in primary production for food webs. Wetland plants also serve as important natural buffers to the onslaught of storm-driven winds and water. OBJECTIVE To protect and maintain the functional integrity of wetlands and associated transitional areas within the Florida Keys. POLICIES To prohibit the destruction, disturbance or modification of any wetland or associated transition area, except where it can be demonstrated that the functional integrity of a wetland or associated transitional area will not be significantly adversely affected by such disturbance or modification. Marine Resources The great value attributed to Monroe County's marine resources is due to their crucial role in the local economy, and in providing a wide range of natural amenities and services. Health and integrity of the marine system is a fundamental prerequisite if these resources are to continue to provide social, economic, and environmental benefits that we have at times taken for granted. Mangroves, seagrasses, and coral reefs, all of which are susceptible to pollution and dredging, are extremely important in providing food and shelter for myriad forms of marine life, providing storm protection, and maintaining water quality. If uses and activities such as dredge and fill, destruction of natural vegetation, use of pesticides and fertilizers, improper sewage and solid waste disposal continue indiscriminately and uncontrolled; the ability of the marine system to function effectively will deteriorate, thereby resulting in the loss of many natural services and socioeconomic benefits to society. Therefore, it is imperative that such uses and activities be carefully regulated so as to insure conservation and protection of resources and long-term maintenance of their productivity. Marine Resources Management Policies Recognizing the crucial role that the marine environment plays in the economy, the protection, conservation, and management of marine resources will be viewed as an issue requiring the County's utmost attention. In an effort to protect and conserve marine resources, emphasis will be placed on protecting the entire marine ecosystem. To this end, maintenance of water quality; protection of marine flora and fauna, including shoreline vegetation; and preservation of coral reefs will be regarded as being absolutely essential to maintaining the integrity of the marine system. * * * Land and water activities which are incompatible with the preservation of marine resources because of their potential adverse effects will be prohibited, restricted, or carefully regulated depending upon the nature of activity and the extent of potential impact. * * * 3.2. Dredging and/or filling associated with maintenance or necessary water- dependent public projects shall be minimized and carefully managed to prevent unnecessary adverse environmental impact. The County will develop and enforce stringent development regulations to minimize water pollution from point and non-point sources in an effort to: improve and maintain quality of coastal waters. . Marine grass beds, mangrove communities, and associated shoreline vegetation will be preserved to the fullest extent possible. Removal of vegetation or modification of natural patters of tidal flow and nutrient input, cycling and export should be considered only in the case of overriding public interest. The County will encourage creation and restoration of marine grass beds, and mangrove communities in areas which could support such growth and could potentially enhance the environmental quality. As far as possible, natural patterns of gradual and dispersed runoff will be maintained. Land and water activity in the vicinity of stress areas (coral, grass bed, and inshore water quality) as identified and illustrated in the Florida Keys Coastal Zone Management Study and as may be discovered during any future study will be carefully controlled and regulated in an effort to arrest further deterioration. Research and study directed toward alleviating the stresses and restoring their condition to natural healthy state will be encouraged arid supported. Marine Resources Areas of Particular Concern Site-specific Designations Lignumvitae Key Aquatic Preserve. * * * Management Policies: B. Development activity on Upper and Lower Matecumbe Keys, including dredging and filling will be prohibited so as not to degrade the waters of the Preserve. * * * 3. John Pennekamp Coral Reef State Park and Key Largo Coral Reef Marine Sanctuary. Management Policies: * * * B. Development activity on Key Largo, including dredging and filling, urban runoff water, and the use of septic tanks will be controlled and regulated in order to minimize stresses which result in cater quality deterioration. Generic Designations All marine grass beds in waters off the Florida Keys. All patch reef coral and other reef formations found in the surrounding waters off the Keys. All shore-fringing mangrove and associated vegetation extending up to 50 feet laterally upland from the landward limit of the shoreline mangrove. Management Policies A. These biotic communities will be preserved to the fullest extent possible. Natural Vegetative Resources The diverse and often unique plant associations of the Florida Keys are a vital element of Monroe County's natural system and economic structure. The natural functions performed by these plant communities with1 regard to marine resources, unique and endangered wildlife, shoreline stabilization, filtering of urban runoff and scenic value make them vital elements in maintainance of the urban structure and attractions for the tourist base of Monroe County's economy. Natural Vegetation Management Policies In recognizing the need to preserve as much natural vegetation as possible, the County will direct its land use and development regulations; to minimize destruction of natural vegetation and modification of landscape. Guidelines and performance standards designed to protect natural vegetation from development will be developed and enforced. Clearing of native vegetation for development will be controlled. 3. Regulations controlling development in areas characterized primarily by wetland vegetative species such as mangrove and associated vegetation will emphasize preservation of natural vegetation to the maximum degree possible. 8. The existing County ordinances designed to protect and conserve natural vegetation will be strictly interpreted, rigidly enforced, and/or amended when necessary. Consistent with the Monroe County comprehensive plan, the Monroe County land development regulations further the standards, policies and objectives of the plan to protect, maintain and improve the Florida Keys environment. In this regard, the provisions of the regulations requiring final plat approval before a development order may issued provide assurance that the proposed activity will be -consistent with the comprehensive plan, the land development regulations, and applicable provisions of state law. Likewise, pertinent to this case, the provisions of section 9-864, MCLDR, regarding open space requirements, and section 9.5-345, regarding environmental design criteria, further the plan's policy to minimize the destruction of natural vegetation and modification of landscape, and to preserve to the maximum degree possible areas characterized primarily by wetland vegetation, such as mangroves and associated vegetation, and to permit such removal only in cases of overriding public interest. Here, while it cannot be concluded, as advocated by the Department, that the Monroe County comprehensive plan and land development regulations prohibit, under any circumstances, construction of the subject canal, it must be concluded, at this stage, that construction of the canal has not been demonstrated to be consistent with the plan and regulations. To be consistent, the Applicants would have to secure final plat approval for the canal, through the plat amendment process; a minor or major conditional use approval, as appropriate, as mandated by, inter alia, section 9 .5-345, MCC, for destruction of the mangrove community; and demonstrate that excavation of the canal on each of the platted lots would be consistent with the open space ratios of section 9- 804, MCLDR, and the environmental design criteria of section 9.5-34, MCC, or secure a conditional use as required by section 9.5-34-5, MCC. Amendment to the application post hearing In their proposed recommended order, submitted post hearing, the Applicants propose that the hearing officer recommend that, as a condition, the proposed canal terminate at the line of mean high water instead of extending approximately 100 feet into the boundaries of John Pennekamp State Park. The ostensible reason for the Applicants' request is their desire to eliminate the need for seeking approval from the Department of Natural Resources for intrusion into the boundaries of the park, and thereby shorten the time needed to secure all governmental approvals. While the Applicants did elicit testimony at hearing, albeit on rebuttal, that termination of the canal at the mean high water line would not significantly affect its performance as a flushing canal due to the extreme porosity of the caprock, the proof is not persuasive that the subject permits should be so limited or conditioned. Notably, the opinion that was offered in this regard was that of an expert hydrographic engineer who directed his remarks solely from a hydrographic viewpoint. The Applicants offered no testimony or other proof that would address the potential impacts, in any, that might occur to, inter alia, water quality or the biota, should the canal be terminated or closed in such a fashion. Under the circumstances, the Applicants failed to persuasively demonstrate that such amendment or condition is appropriate. This finding is not, however, preclusive of their applying for such modification to Monroe County.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Florida Land and Water Adjudicatory Commission enter a final order sustaining Monroe County's issuance of the subject permits in so far as they relate to Phase I of the proposed project, and reversing Monroe County's decision to issue the subject permits in so far as they relate to Phase II of the proposed project. It is further recommended that such final order specify those items set forth in paragraph 4, Conclusions of Law, as the changes necessary that would make the Applicants' proposal eligible to receive the requested permits for Phase II of their proposal. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 19th day of October 1990. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of October 1990.
The Issue The issue to be determined in this case is whether the Respondents, Florida Department of Transportation (“FDOT”) and Palm Beach County (also referred to as “the Applicants”), are entitled to the issuance of an Environmental Resource Permit (“ERP”) to construct an extension of State Road 7 (“SR 7”) and its associated surface water management system in Palm Beach County.
Findings Of Fact The Parties The City is a municipality incorporated under Florida law. The District is a regional agency with the authority to regulate the construction, operation, and maintenance of any surface water management system pursuant to chapter 373, Part IV, Florida Statutes, and Florida Administrative Code Titles 40E and 62. FDOT is an agency of the state of Florida charged with the establishment, maintenance, and regulation of public transportation. It is a co-applicant for the ERP permit. Palm Beach County is a political subdivision of the State of Florida, and is a co-applicant for the ERP permit. Background State Road 7 Extension The ERP was issued by the District for an 8.5-mile extension of SR 7 between Okeechobee Boulevard and Northlake Boulevard in Palm Beach County. The purpose of the proposed roadway is to relieve traffic now moving through rural residential areas and two large residential developments known as The Acreage and Jupiter Farms. The proposed roadway would also improve hurricane evacuation by providing additional capacity and connectivity, and reduce emergency response time in the rural residential areas. The proposed roadway alignment was selected by FDOT after a multiyear corridor study under a National Environmental Protection Policy Act process. Four corridors were considered using federal selection criteria that addressed social, environmental, property, physical, and financial impacts. There are two segments of the proposed roadway covered by the ERP. The southern segment would add two more lanes to the existing two-lanes of SR 7 from Okeechobee Boulevard North to 60th Street North, just south of the M-Canal. This segment is 4.4 miles long. The southern segment is not at issue in this case. The northern segment would extend four lanes of SR 7 east from 60th Street North about one mile, and then north 3.1 miles to Northlake Boulevard. This is the roadway segment challenged by Petitioner. Hereafter, all references to “the Project” are to the northern segment. The Project includes a raised roadway, median, sidewalks, bike lanes, and stormwater swales. It also includes a bridge over the M-Canal and a bridge over a water control outfall. The Project would be constructed in an existing right- of-way (“ROW”). FDOT owns a ROW that is approximately 200 feet wide. The County owns an adjacent 120-foot-wide ROW, so that the total width of the Project ROW is 320 feet. Running north/south within the ROW is a dirt service road, a ditch, and a fence. Much of the vegetation in the ROW is dominated by invasive and exotic plant species, including Melaleuca, Carolina Willow, Brazilian Pepper, and Australian Pine. The Ibis Development West of the Project ROW is the 1,958-acre Ibis Golf and Country Club residential development (“Ibis”). In 1989, an ERP was issued for Ibis’ surface water management system (“the Ibis system”). The Ibis system includes almost 300 acres of interconnected lakes that provide water management and water quality treatment for Ibis. The 1989 permit required the Ibis system to be sized to receive and treat runoff from a segment of Northlake Boulevard and from an existing two-lane road off of Northlake Boulevard that serves the commercial area of Ibis, which is directly north of the Ibis residential area. The Ibis system was also required to receive and provide water treatment and storage for the stormwater runoff from 46.8 acres of the ROW for SR 7. The parties introduced evidence about modifications to the 1989 permit, which the City contends reduced the treatment capabilities of the system. It is found from the preponderance of the evidence that the original system and its modifications continued to meet design requirements to store and treat future runoff from 46.8 acres of the SR 7 ROW.1/ When the water in the Ibis lakes reaches elevation 17.5 feet NGVD (National Geodetic Vertical Datum), pumps at two pump stations at the south end of Ibis begin pumping water over a berm into Ibis Preserve, a 366-acre natural area directly south of Ibis. Water is retained in Ibis Preserve unles it exceeds an elevation of 18.5 feet, when it then passes over an outfall structure into the Grassy Waters Everglades Preserve (“Grassy Waters”) to the east. Ibis Preserve provides additional water quality treatment for the water pumped from Ibis, but this additional treatment was not part of the calculation of water quality management for Ibis. The Ibis system was required to meet District permitting criteria before discharge to Ibis Preserve. The North Palm Beach County Improvement District (“Improvement District”) owns and has operational and maintenance responsibility for the Ibis system. It also owned and managed Ibis Preserve, but transferred ownership and management of Ibis Preserve to the City in 2004. Grassy Waters/Water Catchment Area To the east of the Project is the City-owned “Water Catchment Area,” which covers about 14,700 acres or 23 square miles. The Water Catchment Area is owned by the City and is part of its public drinking water supply system. Water in the Water Catchment Area flows to Lake Mangonia where it is withdrawn, treated, and then delivered to residents and businesses in the City, the Town of Palm Beach, and the Town of South Palm Beach. There is a statement in the Project application that Grassy Waters refers only to the open water marsh within the Water Catchment Area. The Water Catchment Area includes other habitat types besides open marsh. Most of the information in the record indicates that Grassy Waters and the Water Catchment Area have the same boundaries. Therefore, in this Recommended Order, Grassy Waters and the Water Catchment Area are treated as being two names for the same area. Grassy Waters was once connected to the Everglades and large portions of it have the same characteristics, being an open water marsh with an extended hydroperiod. It is oligotrophic, meaning it is low in nutrients and has an ecosystem adapted to low nutrient conditions. It was undisputed that most areas of Grassy Waters are of high or even pristine environmental quality. Grassy Waters has periphyton, an assemblage of algae that only survive in phosphorous levels of less than 10 parts per billion (“ppb”). Periphyton is the base of the food chain in the open water marsh area of Grassy Waters and is consumed by apple snails and many invertebrates and fish. Grassy Waters has a visitor and nature center and provides recreational opportunities, such as canoeing, hiking, and bird watching. There appeared to be disagreement about whether the Project ROW is located in Grassy Waters or adjacent to it. The ROW is not within Grassy Waters, it is adjacent. However, the wetlands and other surface waters within the ROW are hydrologically connected to Grassy Waters. In the western part of Grassy Waters, which ends at the Project ROW, there are hammock islands and hydric pine flatwoods. The City contends these areas and the rest of the ROW were historically open water marsh, but were changed by human activities. The more persuasive evidence is that this western area was not all open marsh, historically. It was an area of natural transition from open water marsh to other habitat types. Ibis Impacts to Grassy Waters The parties disputed whether the Ibis system is a “failed system.” This is not a technical or defined term. The relevant issue is whether the Ibis system is operating in conformance with the requirements of its permit. The City contends the Ibis lakes are eutrophic and that sediment accumulation in the lakes is releasing phosphorus back into the water, which ends up in Grassy Waters. However, the City’s expert witness, Dr. Harper, admitted that the phosphorus concentration being discharged from the Ibis system, about 40 ppb, is typical for surface water management systems serving large residential developments, although that concentration is at the high end of the range. The phosphorus concentration is closer to 30 ppb in discharges from Ibis Preserve into Grassy Waters, showing that Ibis Preserve provides additional treatment to the waters coming out of Ibis. The characterization of the nutrient loading from the Ibis system as “typical” did not address the additional nutrients in the drainage that the Ibis system is required to accept from the SR 7 ROW. The record does not show that the nutrient concentrations from the Ibis system would still be typical if all of the ROW drainage were added without pre-treatment, as was contemplated by the 1989 Ibis permit. Because Grassy Waters is an oligotrophic ecosystem, it can be adversely affected by phosphorus levels above 10 ppb. When phosphorus is introduced into an oligotrophic system in concentrations over 10 ppb, the system begins to change to denser wetland vegetation, which can include invasive and nuisance species, such as cattail. There is denser vegetation and cattails in Grassy Waters near the Ibis Preserve outfall. There is also more phosphorus in sediments near the outfall. These effects decrease with distance from the outfall, but some effects were detected as far as a half mile from the outfall. The City’s expert witness, Dr. Gaiser, testified that periphyton is dissolved by high nutrient levels and replaced by weedy algae. She found adverse effects on periphyton near the outfall. Dr. Gaiser also found microcystis near the outfall. Microcystis is a toxic algae caused by high elevations of phosphorous. Microcystis comprised over 10 percent of the cell density of the algal community near the outfall. The District’s witness, Mr. Waterhouse, conceded that there is a problem with nuisance vegetation at the discharge point into Grassy Waters. He said the District was not aware of the problem before information was developed for this case. No evidence was presented about what consideration the District gave in 1989, when Ibis was permitted, to the potential adverse impacts of discharging phosphorus into the oligotrophic ecosystem of Grassy Waters. Based on the evidence that a phosphorus concentration of 30 ppb is expected for this kind of surface water management system, it must be concluded that the Ibis system was not designed to prevent harm to oligotrophic receiving waters. Respondents presented evidence to show that phosphorus loadings from the M-Canal could be the cause of the adverse impacts found near the Ibis Preserve outfall. The M-Canal was constructed by the City for the primary purpose of delivering water from Lake Okeechobee, via connection to the L-8 Canal, to the Water Catchment Area for public water supply. For most of its length, the M-Canal runs through Grassy Waters. The City generally maintains the water level in the M-Canal below the elevation of Grassy Waters so water in the canal will not flow into Grassy Waters. However, on some occasions, water flows from the M-Canal into Grassy Waters. High phosphorus concentrations have been recorded in the M-Canal; as high as 300 ppb. Nuisance vegetation is growing in the area where the M-Canal connects to the Water Catchment Area. The preponderance of the evidence establishes that the adverse impacts described by the City’s experts in the area of the Ibis Preserve outfall are caused primarily by discharges from Ibis Preserve. There are three other developments adjacent to Grassy Waters that occasionally discharge to Grassy Waters. These discharges are likely to contain some nutrients, but the amount of nutrients and their effects, if any, on Grassy Waters were not described in the record. The Water Catchment Area is a Class I waterbody because it is used for public water supply. The water quality standard for phosphorus and other nutrients in a Class I waterbody is set forth in Florida Administrative Code Rule 62-302.530(48)(b): In no case shall nutrient concentrations of a body of water be altered so as to cause an imbalance in natural populations of aquatic flora or fauna. Grassy Waters was designated by the Department of Environmental Protection (“DEP”) as a stream. Rule 62-302.531(2)(c) states that the narrative criterion “shall be interpreted as being achieved in a stream segment where information on chlorophyll a levels, algal mats or blooms, nuisance macrophyte growth, and changes in algal species composition indicates there are no imbalances in flora or fauna.” The City presented some evidence regarding nuisance macrophyte growth and changes in algal species composition in Grassy Waters near the Ibis Preserve outfall. Little evidence was presented regarding the practice of DEP or the District in the application of the narrative nutrient standard, but the preponderance of the evidence indicates the agency practice is to consider a stream segment as a whole to determine whether it exhibits an imbalance in natural populations of aquatic flora and fauna.2/ During the course of this proceeding, the District issued administrative complaints against the Improvement District and the City, which include Orders for Corrective Action. The complaints were issued pursuant to section 373.119, Florida Statutes, which authorizes such action when a water management district believes that a violation of any provision of chapter 373 or district rule has occurred. However, at the final hearing, the District was reluctant to say the Improvement District had violated any law or permit condition. The Improvement District did not challenge the enforcement action against it and, therefore, the District’s enforcement order became final. The Improvement District is required to address the accumulation of sediment in the Ibis Lakes, develop a nutrient source control plan, eliminate and reduce the use of herbicides containing copper sulfate, and reassess pumping schedules. There is no target nutrient limit specified in the District’s Orders for Corrective Action. The District’s enforcement action against the City seeks to require the City to increase secondary treatment and retention in Ibis Preserve, provide a plan to remove the exotic/invasive vegetation at the outfall, provide a vegetation monitoring plan, and develop source control measures for residential developments that discharge into Grassy Waters. The City challenged the enforcement action and it remains pending. Snail Kites The Everglades snail kite gets its name from its primary food, the apple snail. In the Everglades, snail kites also feed on an exotic island snail, which occurs there in about equal numbers as apple snails. There was no evidence presented that there are exotic island snails in Grassy Waters. Snail kite habitat is dependent on conditions conducive to apple snails, which are the open marsh and oligotrophic conditions where periphyton flourish. If a sufficient number of apple snails are present, snail kites will find suitable nesting nearby. Dense wetland vegetation is not good forage for snail kites because, even if apple snails are present, the apple snails will be difficult or impossible for the snail kites to see. Dr. Welch, who was the state snail kite conservation coordinator at the Florida Fish and Wildlife Conservation Commission and wrote the snail kite management plan for Florida, testified for the District, where he is now employed as a senior scientist. He said field surveys of snail kite nests in Grassy Waters indicate their numbers are relatively low compared to other areas where snail kites are found. There were only ten successful nests (eggs laid) observed from 2000 to 2016. The City’s Everglades expert, Dr. Lodge, speculated that the low nest counts could be due to difficulty in seeing the nests, but he was not familiar with the survey techniques used and, therefore, his opinion that the numbers could be materially underestimated is not credited. Snail kites nest throughout the Water Catchment Area, but primarily in the open marsh areas of the central and eastern portions of the Water Catchment Area. Over 90 percent of snail kite nests are more than a mile from the Project ROW. Dr. Lodge said there are four snail kite nests within 800 feet of the Project, but he was not more specific about their locations. Most nests are closer to Northlake Boulevard, State Road 710, and the Florida Turnpike. The major factor that adversely affects successful nesting by snail kites and production of offspring is predation, usually by raccoons and rat snakes. “Cold snaps” and drought are also factors. Impacts of The Proposed Project Water Quantity Impacts Water storage for the Project, which was going to be handled in the Ibis system under the 1989 Ibis permit, would be provided in the roadside swales. The Project is designed to retain water volumes greater than typically required for roadways. Stormwater would not flow out of the Project into the Ibis system except in unusually large storm events, in excess of six inches of rainfall. The City did not dispute the Project’s compliance with the applicable water quantity criteria in the District rules. Water Quality Impacts To address the City’s concerns about adverse impacts caused by the Ibis system, the Applicants expanded the roadside swales by ten feet and raised the outfall elevation by 0.05 feet. With these modifications, the Project would provide water quality treatment for its stormwater and no longer rely on the Ibis system for treatment. The swales would provide treatment in excess of the treatment required by District rules. Respondents contend that, when the treatment provided by the Ibis system is added, the total treatment provided for the Project stormwater is more than twice as much as required by District rules. The City, on the other hand, claims that no additional water quality treatment can be provided by the Ibis system because the Ibis Lakes are eutrophic. The preponderance of the evidence supports a finding that Project runoff to the Ibis system would receive additional water quality treatment in the Ibis system and in Ibis Preserve before flowing to Grassy Waters. The effect of the Project’s on-site treatment of its stormwater is that the amount of nutrients that would otherwise flow into the Ibis system from SR 7 would be reduced. Therefore, the effect of the Project is to reduce the nutrient load that the Improvement District was permitted to discharge to Ibis Preserve and Grassy Waters. The City did not dispute the Applicants’ evidence that the Project exceeds the District’s design criteria for water quality. The City focused instead on its contention that, despite its compliance with water quality design criteria, the Project would result in additional nutrient loading to Grassy Waters, which would cause additional adverse impacts to its flora and fauna. The Applicants and the City performed nutrient loading analyses even though such analyses are only required by the District when the receiving waters have been designated by the Department as “impaired” by nutrients or in the case of certain other specially designated waters. Grassy Waters does not have any of these special designations. The Applicants’ nutrient loading analysis concluded that the post-development loading of phosphorus and nitrogen from the Ibis system would be less than the pre-development condition, so there would be a net decrease in nutrients discharged into Grassy Waters. Petitioner’s expert witness, Dr. Harper, believes the Project would increase nutrient loading to Grassy Waters, even if stormwater from the Project did not carry additional nutrients, because the increased volume of water moving through the Ibis system would entrain more nutrients from sediments in the Ibis lakes. Dr. Harper believes the Project would also cause nutrient loading via groundwater seepage through the roadway swales into Grassy Waters. The preponderance of the evidence does not support his opinion that groundwater seepage would cause additional nutrient loading.3/ Dr. Harper believes another source of nutrient loading from the Project would be from surface flow down the roadway embankments. On the eastern embankment, this flow would enter the mitigation area 150 feet from Grassy Waters. Dr. Harper’s estimated total loading from all sources is not persuasive. The estimate gives a false sense of precision. It is based on a number of variable assumptions, some of which are not widely known or in use by experts in the field. In addition, Dr. Harper’s opinion did not appear to appropriately account for the modifications to the Project’s storage capacity. Dr. Harper’s estimated loading was not translated into physical effects in Grassy Waters. The Applicants’ estimate of total nutrient loading also gives a false sense of precision, but it is based on a well-known and widely used methodology. The City failed to prove that the Project would result in more nutrient loading to Grassy Waters than is currently contributed by the ROW. Because the Project would not rely on the Ibis system for stormwater treatment, the Project would reduce the loading that the Improvement District was permitted to discharge to Grassy Waters. To address potential vehicular spills into Grassy Waters, FDOT produced a Spill Response Plan. The swales would capture and contain any material spilled on the roadway or swale. The curb and gutter, a guardrail, gravity wall, and fence also provide protection against spills. The bridge over the M-Canal would use a 54-inch traffic barrier, which is higher than FDOT specifications for the design speed for the bridge. The City did not present evidence to show that the protective measures proposed by the Applicants are less than what is usually considered adequate under similar circumstances, or fails to meet a relevant safety standard. Wetland Impacts Direct Impacts The Project would directly impact 52.37 acres of wetlands and 7.86 acres of surface waters. The impacted wetlands are fresh water marsh, mixed shrubs, and hydric pine flatwoods. The surface waters affected consist of vegetated ditches and un- vegetated channels or canals. The impacted wetlands include 11.77 acres of freshwater marsh. The impacted surface waters are ditches. Most of these wetlands are disturbed and their functional values have been reduced. Secondary Impacts District rules require an applicant to account for the secondary impacts caused by a project that could adversely affect the functions of adjacent wetlands or other surface waters. The Applicant’s Handbook defines secondary impacts to include impacts on wetland functions, water quality, and endangered species, including impacts on areas needed by endangered species for foraging. Part of the Applicants’ assessment of secondary impacts of the Project was made by reviewing the effects of the Acreage Reliever Road on Pond Cypress Preserve, a 1,737-acre conservation area managed by the County that is immediately south of the proposed Project. The County has been monitoring the effect of the Acreage Reliever Road on hydrology, vegetation, and species compensation ever since the road was built. The County found no adverse secondary impacts caused by the road. The species that use the wetlands near the road, including wading birds, appear to be unaffected by the road. The scoring of secondary impacts for the Projects, using the Uniform Mitigation Assessment Methodology (“UMAM”), was conservative, meaning that assumptions were made at the high side of the potential range of impacts. This resulted in more mitigation being required. The Applicants claim the Project would “maintain a 300-foot buffer between the project’s construction boundary and [Grassy Waters].” This appears to be a misstatement. The Applicants’ combined ROW is only 320 feet wide. Going east from the limits of construction, it is 160 feet to Grassy Waters. The Project’s buffer is 160 feet wide. The District accounted for secondary impacts to wetland dependent species, including snail kites, from noise and lights that might discourage use of the area. The Project would provide a tree buffer that will reduce noise and light impacts to Grassy Waters. The roadway lighting plan is also intended to reduce light penetration into Grassy Waters. Most of the threatened and endangered bird species are tolerant of roadways for foraging and roosting, but not for nesting. Section 10.2.7 requires the Applicants to provide reasonable assurances that any future phase of a project or project-related activities will not result in adverse impacts to the functions of wetlands or water quality violations. The Applicants satisfied this requirement by releasing of FDOT ROW north and south of the Project. Cumulative Impacts An applicant must provide reasonable assurance that a regulated activity will not cause unacceptable cumulative impacts upon wetlands and other surface waters within the same drainage basin as the regulated activity for which a permit is sought. Some of the proposed mitigation for the Project is out- of-basin. If an applicant proposes to mitigate impacts in another drainage basin, District rules require consideration of factors such as “connectivity of waters, hydrology, habitat range of affected species, and water quality” to determine whether there are unacceptable cumulative impacts. The Project is located in the eastern Palm Beach County Basin, which has approximately 21,000 acres of wetlands. About 89 percent of the wetlands in the basin are publicly-owned conservation lands, which means their wetland functions will continue into the future. The cumulative impact analysis was conservative, meaning that the actual impacts are likely to be fewer. Petitioner contends that Respondents’ cumulative impact analysis did not account for the unique nature of the Grassy Waters ecosystem as the only remaining low nutrient oligotrophic wetland in the region. The preponderance of the evidence shows that the historical wetland types in the Project area were not all like the open marsh found in the central and eastern portion of Grassy Waters. Respondents accounted for the loss of open water marsh that would be caused by the Project. On-Site Mitigation There would be 52.4 acres of on-site mitigation within a 160-foot-wide strip of land along the eastern limits of proposed construction. This area of the ROW would be managed by removing or treating the exotic vegetation, such as Brazilian Pepper and Maleleuca. Removing the exotic vegetation seed source would prevent further spread of these nuisance species into Grassy Waters. Where native habitats have been altered with ditches and berms, the land would be graded to create a slope from the limits of construction eastward to the edge of the ROW. The eastern elevation would be similar to the adjacent marsh or hydric pine areas of Grassy Waters. Then, native vegetation would be planted. The habitats enhanced, restored, or created would include freshwater marsh, hydric pine flatwoods and mixed forested wetlands, including cypress. The planting of mixed, forested species would provide sound and light buffering for snail kites and other species in Grassy Waters. Two wildlife passages would be created underneath the Project with fencing designed to direct wildlife to use the wildlife passages. Slats would be placed in the roadway fencing to prevent small animals from going through the fence and onto the roadway. The on-site mitigation was scored using UMAM and determined to result in functional gain. The UMAM analysis was conservative, meaning that the actual functional gain is likely to be greater. The City did not contest the UMAM scoring. Off-site Mitigation FDOT is applying mitigation credits from 210 acres at the Pine Glades Natural Area (“Pine Glades”) to offset impacts to 15.7 acres of herbaceous marsh and 26.78 acres of forested wetland impacts. Pine Glades is a regional off-site mitigation area located in the Loxahatchee River Basin and is owned and operated by Palm Beach County. Pine Glades consists of a mix of wet prairie, depression marshes, hydric pine flatwoods, and mesic flatwoods. The restoration work in Pine Glades has already been completed. Pines Glades implements a detailed management plan that provides regional ecological value. Robbins testified that Pine Glades has similar habitats to Grassy Waters. Pine Glades has periphyton, apple snails, snail kites, wood storks, and sand hill cranes. Pine Glades has some areas with oligotrophic conditions. Additional off-site mitigation to offset 52 acres of wetland impacts caused by the Project would be provided at the DuPuis Reserve (“DuPuis”). DuPuis is a regional off-site mitigation area located between the L-8 Canal and the C-44 Canal in western Palm Beach and Martin Counties, and is owned and operated by the District. DuPuis would provide mitigation with 34.71 acres of herbaceous wetlands and 43.8 acres of forested wetlands. DuPuis is appropriate to offset the impacts associated with the Project because it provides similar habitats with similar values of functions for similar wildlife. DuPuis implements a detailed management plan that provides regional ecological value. The City argues that there is little similarity between the Grassy Waters ecosystem and Pine Glades or DuPuis, so the mitigation there cannot offset the unique assemblage of plants and animals that would be lost in Grassy Waters. It is unnecessary for Pine Glades and DuPuis to be dominated by open water marshes like Grassy Waters. It is only necessary that they have some of these areas to offset Project impacts to open water marsh. Proposed snail kite mitigation would provide 52.5 more acres of snail kite habitat than would be directly impacted by the Project. The mitigation for snail kites will be located in FDOT ROW adjacent to the Project, south of the M-Canal, and north of Northlake Blvd. Erwin expressed concern about fragmentation of the ecosystems that would be caused by the Project. The areas that would be affected by the Project have already been fragmented by berms, ditches, and fences. Grassy Waters is surrounded by berms, a canal, and highways. The Project would cause fragmentation, like all roads. However, the fragmentation was reduced where practicable, and the City did not show that the roadway would cause the loss of any significant “greenway” now used by wildlife. Snail Kite Impacts Section 10.2.2(a) requires an applicant to provide reasonable assurances that a proposed activity would not impact wetlands and other surface waters so as to reduce the abundance and diversity of listed species. Snail kites, wood storks, sandhill cranes, white ibises, and little blue herons are listed species that have been observed within the Project corridor. As explained in the Conclusions of Law, the UMAM process is designed to mitigate for wetland functional losses, not snail kite functional losses. However, the potential impact to any listed species warrants close attention to the issue of whether function-for-function wetland mitigation would be provided. There will be 11.5 acres of direct impacts to snail kite habitat within the footprint of the Project area. Dr. Welch believes secondary impacts to wetland functions associated with snail kites could extend 800 feet east of the ROW. Mitigation for snail kites would be located in the Rangeline corridor south of the M-Canal and north of Northlake Boulevard. Dr. Welch estimated there were about 64 acres of snail kite habitat in the Rangeline corridor similar to the 11.5 acres of habitat located in the Project footprint. Dr. Welch conceded that he has no evidence that snail kites currently use the Rangeline, but he believes the habitat is suitable and is appropriate mitigation. Petitioner claims there are studies of “similar birds” indicating that snail kites avoid highways due to noise. However, the studies were not of similar birds. More weight is given to Dr. Welch’s testimony that snail kites are not particularly sensitive to roadway noise. Dr. Welch stated that Pine Glades would likely have value for snail kites because it is near the Hungryland Wildlife Management Area, which has the same number of successful snail kite nests as Grassy Waters. The City contends that Pine Glades is too far away from Grassy Waters to mitigate Project impacts to snail kites. However, snail kites range long distances to forage; several hundred miles in a few days. Satellite telemetry of snail kites shows snail kites from Grassy Waters are using Pine Glades for feeding. Dr. Welch reviewed snail kite nesting data to determine whether roads deterred nesting and found that snail kites frequently nested within 500 feet of major roadways. Dr. Welch refuted the idea that Grassy Waters provided snail kite refuge during drought conditions, because Grassy Waters is also subject to drought conditions that adversely affect snail kites. There are conditions in the permit to limit potential impacts to snail kites during construction of the Project. If snail kite nesting is observed within 1,640 feet of construction, all Project construction must cease. Thereafter, monitoring of the nest and notification of the U.S. Fish and Wildlife Service is required. Construction cannot resume until that nest has been considered finished. FDOT would place a conservation easement over 82.6 acres in the FDOT ROW between Okeechobee Boulevard and the M-Canal, south of the Project area that is the subject of this proceeding. The conservation easement would maintain connectivity between the Pond Cypress Natural Area and Grassy Waters and ensure that no future southern extension of the roadway will be constructed. A conservation easement would be placed on the FDOT ROW between Northlake Boulevard and SR 710, an area of approximately 43.5 acres. Preserving this area protects a hydrologic connection between Loxahatchee Slough Natural Area and Grassy Waters. It also ensures no future northern extension of the roadway. A conservation easement would be placed on a portion of the FDOT ROW between SR 710 and Jupiter Farms, an area of 44.5 acres. This section of ROW is in the Loxahatchee Slough and the release of the ROW would be a direct benefit to Loxahatchee Slough. The preservation of these areas would benefit fishing and recreational values in the Pond Cypress Natural Area, Grassy Waters, and the Loxahatchee Slough Natural Area. These conservation areas did not receive UMAM credits to reduce the wetland acreage needed to offset wetland functional losses, but they were included in the mitigation credit for benefits to snail kites and other wildlife. Summary The preponderance of the evidence established that the proposed mitigation offsets the impacts to wetlands and other surface waters that would be caused by the Project and exceeds the requirements of District rules. Practicable Design Modifications District rules require an applicant to consider alternatives that would avoid or reduce wetland impacts. The City claims the Applicants failed to comply with this rule because FDOT selected a roadway corridor that was expected to have greater environmental impacts than some of the other three corridors that were being considered. As explained in the Conclusions of Law, this argument is misplaced. The District’s review of the Applicants’ measures to avoid or minimize wetland impacts was appropriately confined to Corridor 3, the corridor selected by FDOT where the Project is proposed. The Applicants reduced and eliminated impacts of the Project in several ways. For example, the footprint of the road was narrowed from six lanes to four lanes, wildlife underpasses were provided, retaining walls were used to narrow stormwater features, the median was reduced in size, and the design speed limit was reduced for the bridge at the M-Canal crossing. Under two circumstances, District rules allow an applicant to avoid the requirement to implement practicable design modifications to reduce or eliminate wetland impacts, which are referred to as the “opt-out” provisions. Section 10.2.1.2, Volume I, of the Applicant’s Handbook (“A.H.”) provides: The ecological value of the functions provided by the area of wetland or other surface water to be adversely affected is low, based on a site specific analysis using the factors in section 10.2.2.3, below, and the proposed mitigation will provide greater long term ecological value than the area of wetland or other surface water to be adversely affected, or The applicant proposes mitigation that implements all or part of a plan that provides regional ecological value and that provides greater long term ecological value than the area of wetland or other surface water to be adversely affected. The District determined that the Applicants meet both tests. The preponderance of the evidence supports the District’s determination. The ecological value of the functions provided by the affected wetlands and surface is low and the proposed mitigation would provide greater long-term ecological value than the area being impacted. Pine Glades and DuPuis are part of a plan to restore the ecological value of Northern Palm Beach County and create an “ocean to lake” system of preserves and natural areas.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order approving Permit Number 50-05422-P on the terms and conditions set forth in the amended Staff Report, and the complete application for the Permit. DONE AND ENTERED this 31st day of March, 2017, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 31st day of March, 2017.
Findings Of Fact On or about July 25, 1989, Stephen G. Thompson, Permitting Engineer with the Department of Environmental Regulation (DER), predecessor of the Department of Environmental Protection (DEP), wrote a memorandum to Howard Rhodes, Deputy Director of DER's Bureau of Water Facilities Planning and Regulation. The memo relayed a question being posed by an engineering consultant working for Pasco County on its Lake Padgett Effluent Disposal System, DER construction Permit No. DC51-159899. The question was whether Special Condition 15 should be deleted from the permit. The Lake Padgett permit was for a rapid rate infiltration (percolation pond) land application system for the disposal, via ground water recharge, of domestic wastewater effluent. Through the question passed along to Rhodes, Rhodes understood that the system included percolation ponds and drainage ditches on the site, which the County's engineer referred to as "perimeter ditches." Rhodes was given to understand that the perimeter ditches were designed to improve the performance of the system by lowering the ground water table at the site and increasing the hydraulic capacity of the ponds. The question posed by the County's engineer indicated to Rhodes that Special Condition 15 to the Lake Padgett permit prohibited discharges from the perimeter ditches into wetlands, citing Section 403.086 of the Florida Statutes. The County's engineer suggested: Since these perimeter ditches are being installed 100 feet from the wetted perimeter of the percolation ponds, I believe it is correct to define the water in said ditches as groundwater rather than wastewater effluent. Therefore, I do not believe that Chapter 403.086 would apply to the water in these perimeter ditches. In passing the question along to Rhodes, Thompson also cast it in his own words: If the permittee designs the project with a perimeter ditch system 100 feet away from the edge of the percolation/evaporation pond wetted area, will the discharge from the ditch system have to meet WQBEL or Grizzle-Figg limits if applicable? According to Chapter 17-610.517(2) and 17-610.522, the collection and discharge of more than 50 percent of the applied reclaimed water shall be considered as an effluent disposal system. The question is whether the 100 feet buffer will allow the descrip- tion of the perimeter ditch water to be ground water or a co-mingled ground/reclaimed water. Rhodes reviewed the question and answered by memorandum dated September 15, 1989, which stated in salient part: Based on this review, discharges from perimeter ditch systems of percolation ponds must meet surface water quality requirements of advanced treatment, water quality based effluent limitations, or Grizzle- Figg limitations where applicable. Attached are comments which explain why these surface water quality requirements must be met. * * * COMMENTS Depending on site-specific parameters such as the infiltration rate, existing ground water table, subsurface flow, percolation pond depth, and ditch depth, the content of the water in the ditch may be either ground water or a mixture of ground water and reclaimed water. Because these parameters are site-specific, the content of water in the ditch is site-specific. However, knowledge of whether the water in the ditch is ground water or a mixture of ground water and reclaimed water is not important in determining the effluent limitations of the discharge from the ditch. . . . Because construction of perimeter ditches is associated with the operation of percolation ponds, the ditch should be considered part of the wastewater treatment facility and any discharge from the ditch must meet the applicable requirements of Rule 17-6, F. A. C., or Chapter 403, F.S. Also, because perimeter ditches are constructed around percolation ponds to improve performance, the ditches are located near the percolation ponds and some reclaimed water is normally drained to and collected in the ditch. Rule 17-610.517(2), F.A.C., specifically states discharge from perimeter drainage features that collect reclaimed water after land application are restricted by surface water quality considerations of additional treatment or the WQBEL provisions of Rule 17-6, F.A.C. . . . It was argued that because the zone of discharge is 100-feet from the percolation pond and the ditch is also 100-feet from the percolation pond, the water in the perimeter ditch system is ground water. However, zone of discharge as defined by Rule 17-6.0321(33), F.A.C., does not mean that all water located outside the zone of discharge is ground water. Zone of discharge is more appropriately interpreted as a "mixing zone" for ground water. Waters inside the zone do not have to meet water quality standards. If waters outside the zone do not meet water quality standards, the permit is violated. The following question also was raised: Why do the effluent limitations of Chapter 403.086, F.S., apply for the discharge of a perimeter ditch constructed 100-feet from a percolation pond when they do not apply for the discharge from a percola- tion pond constructed 100-feet away from wetlands? The answer to this question is: The discharge from the ditch is a surface water discharge whereas the discharge from the percolation pond is a ground water discharge. In the case of ground water discharges, ground water quality standards must be met outside the zone of discharge. . . . It seems that [the second sentence of F.A.C. Rule 17-610.517(2)] was interpreted to mean; if more than 50 percent of the applied reclaimed water is collected in the ditch, the water is considered effluent and if 50 percent or less of the applied reclaimed water is collected, the water is considered ground water. This is not the intent of this rule. The intent is; if more than 50 percent of the applied reclaimed water is collected in the ditch, the applied reclaimed water is considered an effluent disposal system and if 50 percent or less of the applied reclaimed water is collected, the applied reclaimed water may be considered a reuse system. Therefore, this section of rule is not applicable to the Lake Padgett effluent disposal question. The permittee requested Specific Condition 15 be deleted from the permit. In some cases, this may be done. However, if it is deleted, a condition should be added to the permit that the discharge from the ditch meet surface water quality requirements of advanced treatment, WQBELS, or Grizzle-Figg limitations, where applicable . . ., [and] the permittee should also be required to provide reasonable assurance that the required discharge limitations can be met. On March 15, 1990, another Department employee, named Jim Bottone, prepared a two-page memorandum generally discussing the increasing use of perimeter ditches conjunction with rapid-rate land application systems. The memorandum concluded: "In summary, the use of perimeter ditches in conjunction with rapid-rate systems appears to be a 'force fit' of technology in order to save money on disposal. These systems appear to circumvent the intent of the Department's reuse initiative." The discussion included a statement: "Rule 17- 610.517(2) states that the discharge from a perimeter ditch shall be restricted by surface water quality considerations." On December 13, 1990, the Department's Reuse Coordinator, David W. York, Ph.D., P.E., sent Richard Harvey, Deputy Director of the Department's Division of Water Facilities, a memorandum on the subject of perimeter ditches and rapid-rate land application systems. It referred to the Rhodes and Bottone memos, stating that the Rhodes memo "clearly addresses the applicability of surface water quality considerations for this type of system." It also stated: If perimeter ditches are used in association with land application projects, and if the ditches receive flows containing a portion of the applied reclaimed water, the ditches are subject to surface water quality constraints. Surface water quality constraints may include technology-based effluent limits, water quality-based effluent limits, or Grizzle-Figg limitations, as appropriate. F.A.C. Rule Chapter 17-610 pertains to "Reuse of Reclaimed Water and Land Application." F.A.C. Rule 17-610.517 is entitled "Surface Runoff Control." Paragraph (1) of the rule requires that the land application site be designed to prevent the entrance of surface runoff, if necessary by placement of berms around the application area for this purpose. Paragraph (2) of the rule provides: Discharge from perimeter drainage features that collect reclaimed water after land application, shall be restricted by surface water quality considerations pursuant to additional treatment or WQBEL provisions of Rules 17-600.420(2) and 17-600.430, F.A.C., respectively. Rapid-rate land application systems that result in the collection and discharge of more than 50 percent of the applied reclaimed water shall be considered as effluent disposal systems. Rules 17-600.420(2) and 17-600.430 establish additional levels of wastewater treatment for facilities that discharge to surface waters. The Department is in the process of amending part (2) of Rule 17- 610.517(2) by separating the sentences, making the second sentence a new part (3) of the rule, and explaining that the new part (3) would be used solely to classify projects as "reuse" or "disposal" and would in no way affect the requirements of part (2) of the rule. This amendment explicitly would codify in the rule the explanation in the Rhodes memo that the second sentence of current Rule 17-610.517(2) addresses the classification of disposal systems and, to that end, establishes as a benchmark the "collection and discharge [in the ditches] of more than 50 percent of the applied reclaimed water." F.A.C. Rule 17-610.522, entitled "Subsurface Drainage," provides: Subsurface drain systems, where necessary, shall be designed in accordance with appropriate portions of Rule 17-610.300(4)(f), F.A.C., concerning Soil Conservation Service criteria for subsurface drains. The drainage system shall be designed so that the seasonal high water table is drawn down to a minimum of 36 inches below pond bottoms during resting periods. Pollutant content (including fecal coliforms) of the reclaimed water collected by the underdrains may be further restricted by surface water quality considerations pursuant to additional treatment or WQBEL provisions of Rules 17-600.420(2) or 17-600.430, F.A.C., respectively. Rapid-rate land application systems that result in the collection and discharge of more than 50 percent of the applied reclaimed water shall be considered as effluent disposal systems. The Department also is in the process of amending Rule 17-610.522 by separating the sentences, making the last sentence a new part (2) of the rule, and explaining that the new part (2) would be used solely to classify projects as "reuse" or "disposal" and would in no way affect the requirements of part (1) of the rule. The 50 percent figure in F.A.C. Rules 17-610.517(2) and 17-610.522 was chosen based on deliberations by the 1988-89 Reuse Technical Advisory Committee (RTAC). The RTAC offers technical expertise and advice to the Department as revisions to Chapter 17-610 are drafted. A criterion was needed for categorization purposes, and it was determined that 50 percent represented a reasonable break point. The members of the RTAC represent the national leaders in reuse of reclaimed water. F.A.C. Rule 17-610.521(2) establishes a minimum 500-foot setback distance between the wetted areas of a reuse land application site and Class I and II surface waters of the state, reduced to 100 feet if high-level disinfection is provided. F.A.C. Rule 17-610.521(5) provides that setback distances to other classes of surface waters "shall be sufficient to provide reasonable assurance of compliance with applicable water quality standards." F.A.C. Rule 17-610.521(8) provides: The minimum setbacks . . . shall only be used if, based on review of the soils and hydrogeology of the area, the proposed hydraulic loading rate, quality of the reclaimed water, expected travel time of the ground water to the potable water supply wells and surface waters, and similar considerations, there is reasonable assurance that applicable water quality standards will not be violated. There is a valid reason for not establishing the same minimum setback distances between the wetted edge of percolation ponds and perimeter drainage features that collect reclaimed water after land application. Unlike reclaimed water that disperses and diffuses in the ground before a part of it reaches a water body solely through the ground, even though reclaimed water may travel through the ground for 100 feet before reaching perimeter drainage features, those features then collect and concentrate the resulting mixture of reclaimed water and groundwater for discharge into the surface water, typically at a limited number of discharge points and at higher volumes and flow rates. At some point as it migrates through the ground and mixes with other ground water, reclaimed becomes indistinguishable from naturally occurring ground water. It is, of course, difficult to pinpoint precisely how far from the wetted edge of a percolation pond this occurs.
The Issue The issue in this case is whether the Southwest Florida Water Management District (District) should issue to Century Realty Funds, Inc. (Century) Environmental Resource Permit (ERP) No. 44000227.002 (the ERP), which would modify Management and Storage of Surface Waters (MSSW) Permit No. 400227.000 (the Permit) and Stormwater Exemption No. EO1481, issued by the District to Century in July 1985 for construction of a surface water management system for Angler's Green Mobile Home Park located in Mulberry, Polk County, Florida.
Findings Of Fact The District issued Management and Storage of Surface Waters (MSSW) Permit No. 400227.000 and Stormwater Exemption No. EO1481 to Century in July 1985 for construction of a surface water management system for Angler's Green Mobile Home Park (MHP) located in Mulberry, Polk County, Florida. Angler’s Green MHP Angler’s Green MHP is an 83-acre residential golf course development of approximately 385 homes located off of State Road 37 near Mulberry. Residents at Angler’s Green own their own mobile homes and lease the residential lots pursuant to annual leases expiring December 31 of each year, with guaranteed renewal conditioned upon owner compliance with the terms and conditions of the lease. Prior to being developed as a mobile home park, the property which is now Angler’s Green MHP was part of a phosphate mining operation and was reclaimed under a phosphate mining land reclamation plan approved by the Florida Department of Natural Resources and a reclamation contract dated September 4, 1984. Final contours of the Angler’s Green site were made in accordance with the approved reclamation plan. After reclamation contouring, a 23-acre manmade (former phosphate mine pit) lake remained in the northeast quadrant of the Angler's Green site. The resulting lake had a finger arm (bay or cove) extending from the southwest corner of the main body of the lake, oriented in a north-to-south direction and located west of a peninsula of land extending into the northwest part of the lake from the north. The lake also had a short, narrow canal leading into the main body of the lake from the south; the canal connected at a right angle to longer narrow waterway to the south of and extending parallel to the main body of the lake in an east-to-west orientation. There also were two smaller ponds on the property after reclamation contouring. After reclamation, surface water onsite generally flowed westerly and discharged from the property to a railroad ditch along the western boundary of the property. The recorded post-reclamation, pre-development water level for the 23-acre lake, as indicated on the site grading plans, was around 127.1 to 127.8 feet above Mean Sea Level (M.S.L.). The 1985 Permits On July 10, 1985, the District issued MSSW Permit No. 400227.000 and Stormwater Exemption No. EO1481 to Century to authorize the construction of a surface water management system for Angler’s Green. The MSSW Permit had an expiration date of July 10, 1988. As designed, the permitted Angler’s Green surface water management system was to route internal stormwater runoff to swales, detention ponds, and catchment areas before discharging through a sidebank sand filtration system (a berm approximately 300 feet long containing an 8” perforated drain pipe covered by a filter fabric and sand filter material) to receiving waters at the northwest corner of the property. The permitted system was designed with five drainage areas known as Basins A through E. Basin A was in the southeast quadrant of the site; Basin B was to its east in the southeast quadrant of the site; Basin E was to the north of Basin A and included the 23-acre former phosphate mining pit reclaimed as an artificial lake, which was referred to as “Lake E” or sometimes “Pond E"; Basin C was to the west of Basin E; and Basin D was to the west of Basin C and to the north of Basin B. The two smaller ponds on the property were designated Pond C-1 and Pond B-1 and were located in Basin C and Basin B, respectively. Basin D was in the northwest corner of the site; the discharge structure was in the northwest corner of Basin D. As the system was designed, stormwater from Basin E would appear to sheet flow naturally into Lake E; stormwater from Basin A would appear to flow naturally to the southwest, away from Lake E, but the system routed the water from the southwest corner of Basin A to the western end of the waterway on Lake E through an underground pipe. Stormwater from Basin B was to flow to and be retained in Pond B-1; as the system was designed, surface water was not designed to discharge offsite from Basin B. As designed, Lake E served as a detention pond for water from Basin E and Basin A. It was to have a control structure (CS-1) in the arm of Lake E that would produce a seasonal fluctuation range of two feet, from 127.5’ above M.S.L. to 129.5’ above M.S.L. Stormwater discharging from CS- 1 was to be conveyed by pipe to Pond C-1, where it was to mingle with surface water draining from Basin C. When full, Pond C-1 would cascade into the golf course area in Basin D and, as necessary, in a portion of Basin B. After catchment and detention in the golf course area, overflow was eventually and ultimately to discharge offsite through the side-bank sand filtration system in the northwest corner of Basin D. In this manner, the Angler’s Green surface water management system was designed to accommodate the 24-hour, 25- year storm event, which was estimated to produce approximately 8 inches of water in a 24-hour period. It also was designed to comply with the water quality requirements as specified in Florida Administrative Code Chapter 17-25 (1985 Ann. Supp.) by detaining the first half-inch of runoff before discharging it offsite through the sidebank sand filtration system in the northwest corner of Basin D. (All rule citations are to the Florida Administrative Code.) Omission of the Stangls During the review process, the District noted from drawings submitted as part of Century's MSSW Permit application that the project area did not include approximately the eastern third of the main body of Lake E. District staff brought this to Century's attention in a request for additional information (RAI) and stated: "If possible, you should obtain a perpetual right to operate and maintain the lake from other owners." In response, Century falsely represented to the District that L. Kirk McKay, a joint venture partner of Century, was the only riparian owner on Lake E and that Century had obtained from him a perpetual right to operate and maintain Lake E as part of the MSSW Permit. In fact, the Stangls owned property on the east side of the lake, including approximately 500 feet of lakefront and contiguous lake bottom. The Stangls and two partners purchased the property from McKay himself in 1979. The Stangls bought out their partners in 1984. The District relied on Century's misrepresentation. The District would not have issued the MSSW Permit to Century if the District had known that Century did not own or control all the land being used for the Permit--specifically, including all of Lake E. See Rule 40D-4.101(1)(d) and (2)(d)6. (1985) (application must include "evidence of ownership or control"). In addition, because the District was unaware of the Stangls' ownership of a portion of Lake E, the District did not require Century to give the Stangls direct, actual notice of the Century's permit application. Instead, the District only required that Century publish notice of the District’s receipt of the permit application. Notice was published on April 3, 1985, in the Lakeland Ledger, a newspaper of general circulation qualified under the terms of Section 50.011, Florida Statutes. But the Stangls did not see the published notice, were unaware of the permit application, and did not ask to participate in the permitting process. The Stangl property adjacent to Angler’s Green remained undeveloped and unoccupied until 1999, when the Stangls' son, John, established a business on the site. Prior to 1999, the Stangls visited the property a couple times a year. They were fully aware of the construction and operation of Anglers Green as a mobile home park across Lake E. During this time, Century leased 385 lots with guaranteed annual renewal conditioned only upon compliance with lease terms and conditions. Amenities under the leases included clubhouse and golf course privileges. At no time before 2000 did the Stangls take any action to challenge the validity of Century's 1985 MSSW Permit. 1985 Surface Water Management Permitting Requirements In 1985, permitting requirements for surface water management systems were divided between two regulatory schemes. Surface water management permits in Polk County were issued by the District under Chapter 373, Florida Statutes, and Rule Chapters 40D-4 and 40D-40, which addressed water quantity and flooding issues for projects greater than and less than 40 acres, respectively. Water quality permits or exemptions from water quality permitting requirements were issued by the Department of Environmental Regulation under Chapter 403, Florida Statutes, and Rule Chapter 17-25 to address water quality concerns. It was not until 1988 that permitting requirements were consolidated into the MSSW regulatory program administered by the District under Rule Chapters 40D-4 and 40D-40. In 1985, the District did not have a Basis of Review (BOR) to specify system design requirements for applicants to provide reasonable assurances that the conditions for issuance of surface water permits were satisfied. Standards and criteria for the design and performance of surface water management systems were contained in Rule 40D-4.301(2) (1985) Under subsection (2)(i) of that rule, projects designed to meet the requirements of Chapter 17-25 [Regulation of Stormwater Discharge] were presumed to meet applicable State water quality requirements. There were no requirements for wet detention pond littoral zones. 20. Under Rule 17-25.03(2)(b) (1985 Ann. Supp.), stormwater management systems for projects with drainage areas less than 100 acres that provided retention or detention with filtration of the first half-inch of runoff were exempt from the permitting requirements of Rule Chapter 17-25. 21. In 1985, District Rule 40D-4.301(2)(j) (1985) allowed for natural areas and existing water bodies to be used for stormwater retention or detention purposes when not in conflict with environmental or public use considerations. Areas that could be considered for this purpose included previously-degraded areas or man-made areas (such as borrow pits). Apparently, the District allowed Century to use Lake E as a detention pond under this provision. Deviations from MSSW Permit Angler’s Green MHP was constructed in two phases, with the first phase completed in 1985, and the second phase completed in 1987. Construction of at least the part of the surface water management system to serve the first phase took place prior to 1985; it was not clear from the evidence whether construction of the part of the surface water management system to serve the second phase also took place prior to 1985, but it clearly took place prior to construction of the second phase in 1987. Condition No. 4 of Century's MSSW Permit required the submittal of a certification that the system was constructed in accordance with the approved and permitted design. But Century did not provide any such certification. Century also never certified to the District that its new stormwater discharge facility, as constructed, continued to qualify for exemption from State water quality requirements. Although the surface water management system was constructed and operating, the District never transferred the 1985 Permit to the operation phase. In several respects, the Angler’s Green surface water management system was not constructed as designed, approved, and permitted in 1985. The pipe to convey stormwater from the southwest corner of Basin A back to the Lake E waterway apparently never was constructed; instead, stormwater from Basin A was routed to Pond B-1. (There also was a berm constructed in Basin A near the southern boundary of the site; but that berm apparently was a visual berm, and there was no evidence that it affected performance of the surface water management system.) Control structure CS-1 (which was supposed to be located in the arm or bay of Lake E) and the pipe to convey overflow from there into Pond C-1 also never were constructed. By the early 1990's, Angler's Green was experiencing flooding in the golf course area in Basin D and B for extended periods of time. In November 1993, the District responded to a complaint of flooding in that vicinity. Upon investigation, the District determined that malfunction of the surface water management system serving Reservation Lakes (now known as Paradise Lakes), a development to the north and downstream of the Angler's Green system, was causing water to back up through the wetlands and the sand filtration system in the northwest corner of the Angler’s Green project. As a result, water overtopped the discharge structure, equalized at levels above the top of the discharge structure's berm, and flooded the golf course for extended periods of time. At some undetermined point in time, an unpermitted pond was dug in Basin D, apparently in an attempt to alleviate flooding of the golf course. In addition, possibly for the same purpose, a pump was installed in Basin D near Pond C-1, and a pipe was installed to convey stormwater from there into Lake E. The sidebank sand filtration system designed to provide filtration of stormwater prior to discharge from the northwest corner of the site does not appear to exist today. It may be present but difficult to see after 15 years of plant growth; or it may have been removed or disturbed as a result of re-grading in the area. However, the evidence proved that the discharge structure was present in 1993, and there is no reason to believe that it was not installed during construction of the surface water management system--i.e., by 1987 at the latest. In addition, at some undetermined point in time, a pipe was installed at the northeast corner of Lake E to convey overflow from Lake E eastward to a drainage ditch located alongside SR 37 to the north of the Stangls' property. No witnesses could testify as to when the pipe to the SR 37 ditch was installed or its elevation. (The District and Century state in their PRO that Map No. 2 in P/I Exhibit 14--an aerial map/survey submitted to the District by Century on August 13, 1990, as part of Century's 1990 Water Use Permit No. 209993.000 application--notes the pipe's elevation as 127.95 feet above M.S.L.; but no such finding could be made from review of the exhibit.) Roads in Angler's Green have inverted crowns to convey runoff from roads, driveways, and roofs away from mobile home lots. Some runoff from these impervious surfaces appears to be directed into a swale on the east side of the site; this swale leads to Lake E. In addition, approximately 12 drains have been installed in or near roads in Angler's Green that convey water through pipes directly into Lake E or Pond C-1. Under current Rule Chapters 40D-4 and 40D-40, road drains connecting impervious surfaces to Lake E would have to be shown on application construction drawings, and separate stormwater calculations would have to be provided in an application. But in 1985 this was not required. Century's calculations, together with flow arrows on drawings showing the direction of stormwater flow towards the detention ponds, were considered sufficient--especially since Century's calculations used a relatively high runoff co-efficient. As a result, the existence of these drains and pipes are not considered to be substantial deviations from the original, approved design. Similarly, approximately 64 roof drains and pipes conveying water from roofs directly into Lake E and Pond C-1 would not be considered substantial deviations from the original, approved design. In addition, these apparently were installed by mobile homeowners over the years, not by Century. From 1985 to 2000, the District did not have occasion to address regulatory concerns at Angler’s Green, except for the complaint of flooding in the golf course area that occurred in November 1993 and a more recent complaint about an area of the golf course that was designed to flood under certain conditions. Otto Stangl’s Complaint and the District’s Response Around November 1999, John Stangl noticed a fish kill in the ditch along SR 37 near the Stangl property. He also was contacted by a governmental compliance officer concerning the fish kill. Upon investigating, John Stangl saw the unpermitted pipe leading from Lake E that was discharging into the SR 37 ditch where the fish kill was observed, as well as the unpermitted pump that was pumping water from the Angler’s Green golf course area through a pipe that discharged into Lake E. In February 2000, Otto Stangl complained to the District about the fish kill and the existence of the unpermitted structures associated with Lake E. Upon receiving Otto Stangl’s complaint, District staff conducted site visits of the Angler’s Green project. Staff observed the unauthorized pump and pipe conveying water from Pond C-1 to Lake E and the unauthorized pipe conveying water from Lake E to the SR 37 ditch. Staff also observed that the Lake E control structure was missing, the pipe to convey stormwater from Basin A to Lake E was missing, and Basin D had been re-graded. In February 2000, the District also became aware of the fact that Century did not have full ownership or control of Lake E. On March 15, 2000, the District issued Century Notice of Non-Compliance and directed Century to either construct the system as designed and permitted or to seek a permit modification. On May 8, 2000, Century submitted a letter application to modify the original MSSW Permit No. 400227.000 by constructing the originally permitted Lake E control structure and pipe conveying water from Lake E to Pond C-1, but in a different location in Lake E than originally permitted due to the existence of homes at the location where these structures were originally planned. The application was subsequently amended to be a formal modification upon Century’s request for further modification to allow Basin A stormwater to flow to Pond B-1 and to expand Pond B-1 and add a control structure and an effluent filtration system. Despite having actual knowledge since at least February 2000 that the Angler's Green surface water management system was built partially on their property, the Stangls did not ask for a hearing on the 1985 Permit. Instead, they awaited the District's consideration of Century's modification application and sought to challenge the District's notice of intent to grant the modification permit issued on October 29, 2001. The District’s Regulatory Compliance Practices In the 1980's, the District appeared to pay little or no attention to construction of permitted projects or submission of required post-construction certifications. Many projects permitted by the District in the 1980’s, such as Angler’s Green, were built and operating although no certifications had been submitted; as a result, the permits issued for these projects never were transferred to the operation phase. Eventually, some projects not built in compliance with issued permits came to the attention of the District, typically through third-party complaints about drainage problems and flooding. By this time, there was a large backlog of issued construction permits for which no required post-construction certifications had been submitted. The backlog of these older projects was so large that the District decided not to initiate an aggressive, systematic, and comprehensive review of all permits for which no required certifications had been submitted. Instead, projects were checked on an ad hoc basis as complaints regarding the functioning of their surface water management systems were registered. When it came to the attention of the District in this manner that a project had been built under an MSSW permit but that no required certifications had been submitted, the District first attempted to secure the required certifications in the form of certified as-built construction drawings and a Statement of Completion, as required by BOR 2.7. In so doing, it was common practice for the District to accept certifications beyond the expiration date on a permit. If projects were substantially completed, the District would not deem the permit as expired simply because the required certifications had not been submitted before the expiration date; and such projects did not lose their status as being permitted. It should be noted that, according to the testimony of the District's expert, William Hartmann, this agency practice was not based on an interpretation of Rule 40D- 4.321(1)(b) (1985) (on duration of construction permits). Rather, the agency practice was to ignore the expiration of the construction permit under those circumstances. In addition, it does not appear from the evidence that the District ever before has faced the situation presented in this case--where a person on whose property part of a surface water management system was built without the person's consent opposes modification and asserts the construction permit has expired. In cases where the agency's practice was applied, if the required certified as-built construction drawings and Statement of Completion could not be provided because the project was not built in accordance with the MSSW permit, the District would require the permittee to either bring the system into compliance with the approved permit designs or obtain a modification of the construction permit. Letter modifications would be accepted when the requested modification would not substantially alter the permit authorization, increase the authorized offsite discharge, impact the environmental features of the project, decrease the required retention/detention, decrease the required flood control elevations for roads or buildings, or decrease pollution removal efficiency. See Rule 40D-4.331(2)(b) (1985). (The current version of the rule adds renewal or extension of the existing permit duration.) Alterations meeting the threshold requirements for a letter modification would be presumed to meet the conditions for issuance for a permit. Otherwise, formal permit modifications would be required. When application is made for a permit modification, the District’s practice is to evaluate those aspects of the surface water management system being modified. Review generally would not extend to the entire system. Permittees seeking to modify their surface water management systems generally are not required by the District to bring the unmodified portions of the system into compliance with current design criteria. Proposed ERP Permit Modification ERP Application No. 44000227.002 seeks authorization to modify portions of the Angler’s Green surface water management system. The specific alterations for which approval is sought are: permanent removal of the existing, unpermitted 18-inch pipe between Lake E and SR 37 roadside ditch; permanent removal of the pump and associated piping conveying water from Pond C-1 to Lake E; installation of the control structure (CS-1), together with installation of pipe to convey water from the control structure to Pond C-1, as designed and approved in the 1985 Permit but different location in the northwest corner of the main body of Lake E; re-grading of the northwesterly portion of the golf course to more closely conform to the original permitted plan and help keep Basin B separate from Basin D; reconstruction of the side-bank sand filter system in the northwest corner of the property, as designed and approved in the 1985 Permit but with a slightly higher invert elevation (122.04 feet above M.S.L.) to prevent water from backing up into Angler's Green from Paradise Lakes again, and with a concrete flume and spreader swale between Pond C-1 and the berm of the side-bank sand filter system; enlargement of Pond B-1; installation of a control structure on Pond B-1; and installation of 100 feet of 6-inch side-bank sand filter discharging to the southwest corner of the property from Pond B-1. By removing the unpermitted pipe to the roadside ditch along SR 37 and by constructing control structure CS-1, with the same control elevations as in the 1985 Permit (albeit at a different location in Lake E), and connecting CS-1 by pipe to Pond C-1 as envisioned in the 1985 Permit, the function of Lake E should approximate its function under the design approved in 1985. Modifying the permitted design to authorize Basin A to flow to Pond B-1 instead of Lake E results in less water flowing to Lake E; these changes will not increase water quantity or quality impacts to Lake E, as compared to the 1985 Permit. As compared to reclamation conditions prior to implementation of the 1985 Permit, water quantity and quality impacts to Lake E would be expected both under the system as designed and permitted in 1985 and as proposed to be modified, by virtue of the similar use of Lake E as a detention pond under either system. Pond B-1 is being enlarged to better accommodate the flow from Basin A. The control structure being added at Pond B-1 will control flow into the swale to the west so as to address water quantity impacts in that area. Stormwater calculations for the revised Pond B-1 demonstrated that the post-development discharge rate will not exceed the pre- development discharge rate, so that there are no concerns for adverse water quantity impacts to receiving waters or adjacent lands or flooding impacts to on-site or off-site property. The historical flows to the west are still maintained. The discharge structure being added at Pond B-1 will account for treatment of the Basin A flow. Based on calculations for revised Pond B-1, the enlarged pond will retain and percolate half an inch of stormwater runoff from the contributing area in 36 hours (which is consistent with current BOR design requirements). The proposed Pond B-1/Basin B modifications, including the routing of Basin A stormwater to Pond B-1, will not adversely affect the quality of receiving waters in that vicinity such that state water quality standards would be violated. Angler's Green is located in the Southern Water Use Caution Area of Polk County. No surface or groundwater levels or surface water flows have been established for this area under Section 373.042, Florida Statutes. The proposed modifications do not involve any works of the District. The proposed modifications are based on generally accepted engineering and scientific principles and employ treatment methods of effluent filtration which involve commonly accepted designs that can be effectively performed and function as proposed. There are no concerns about Century’s financial, legal, or administrative capability to undertake the proposed modifications as specified in the permit, if issued. There are no applicable special basin or geographic area criteria established for this area. Environmental Concerns As with its review of the proposed permit modification for water quantity impacts, the District's review of environmental concerns was limited to review of impacts from the proposed modifications to the original permitted design; unmodified portions of the original permit were not reviewed for compliance with current requirements. An approximately 20 square-foot permanent impact is proposed to Lake E due to the placement of the control structure (SW-1) in the water. A 379 square-foot temporary impact is proposed to Lake E due to the placement of a cofferdam to facilitate construction of the control structure. Temporary impacts to Lake E resulting from the construction of the control structure would be addressed through the use of sediment and erosion controls to prevent possible sedimentation and turbidity that may arise during the construction activity. The placement of a control structure in Lake E would create very minor permanent impacts resulting from the loss of the footprint of the control structure. These impacts would be insignificant. Due to the very minor nature of these proposed impacts, no mitigation would be required, and no loss of wetlands would be required to be recorded on the Wetlands/Surface Water Table. Construction of SW-1 would not adversely impact the value of functions provided to fish and wildlife, and listed species including aquatic and wetland dependent species, by wetlands, other surface waters and other water related resources of the District. No secondary impacts would be expected from construction of SW-1. No unacceptable cumulative impacts upon wetlands and other surface waters would be expected to occur as a result of construction of SW-1. The project area includes .71 acre of herbaceous/forested wetlands (WL-1) in the northwest corner. The potential for secondary impacts is addressed by an existing fence surrounding WL-1, which eliminates concerns for secondary impacts to this wetland area. No adverse impacts would be anticipated to occur to these wetlands, and no adverse secondary impacts to the water resources would be expected to occur as a result of the proposed modifications themselves. The proposed modifications would not cause unacceptable cumulative impacts to wetlands and other surface waters. Class II or Class III waters would not be affected by the proposed modification project. Therefore, Rule 40D- 4.302(1)(c) is not applicable. No seawalls, lagoons or estuaries are involved in this project. Therefore, Rule 40D-4.302(d) is not applicable. The proposed modifications would not be contrary to the public interest. Relocation of a control structure and enhancement of the Basin B portion of the system would create no significant change in impacts. The proposed modifications constitute a slight improvement over water quality from the original permitted design. No threatened or endangered species were identified for Angler’s Green. The proposed relocation and construction of the Lake E control structure, preservation of onsite wetlands in the northwest corner, and re-design of Pond B-1 present no environmental concerns. Consequently, the proposed modifications do not create any potential for adverse effects regarding the conservation of fish and wildlife, including endangered or threatened species or their habitats. The proposed modifications do not adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity. The project area does not involve navigable waters and does not affect the flow of water or cause harmful erosion or shoaling. Hence, Rule 40D-4.302(1)(a)(3) does not apply to this permit modification application. There are no significant historical and archaeological resources involved in this Project. Therefore, Rule 40D-4.302(1)(a)(6) is not applicable to this permit modification application. The proposed modifications would not be contrary to the public interest; they would not adversely affect the public health, safety or welfare or the property of others. No adverse impacts are anticipated to occur as a result of the proposed modifications. The proposed modifications maintain the historic water elevation for Lake E and maintain historic flows for the project area. The modified system should also provide some improvement in water quality.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order denying Century's permit modification application designated ERP No. 44000227.002. DONE AND ENTERED this 8th day of July, 2002, in Tallahassee, Leon County, Florida. ________________________________ J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of July, 2002. COPIES FURNISHED: Joseph D. Magri, Esquire Merkle & Magri, P.A. 5510 West LaSalle Street Tampa, Florida 33607-1713 Joseph P. Mawhinney, Esquire Clark, Campbell & Mawhinney, P.A. Post Office Box 6559 Lakeland, Florida 33802 Martha A. Moore, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899 E. D. Sonny Vergara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899
The Issue The issue in this case is whether the St. Johns River Water Management District (District) should issue a consumptive use permit (CUP) in response to Application Number 99052 filed by the City of Titusville and, if so, what CUP terms are appropriate.
Findings Of Fact Area II and III Wellfields On February 10, 1998, the District issued CUP 10647 to the City of Titusville, authorizing the withdrawal of an annual average of 6.5 mgd from the City's Area II and Area III Wellfields, 5.4 from Area II and 1.1 from Area III. These wellfields are owned and operated by the City and are located within its municipal boundaries. They produce water from the SAS. The Area II Wellfield is located near I-95 in the northeastern portion of the City and consists of shallow wells primarily constructed between 1955 and 2002. It consists of 53 production wells, of which 31 are considered to be of primary use. The City replaced 16 Area II production wells in 1995 and 4 production wells in 2000 and is currently considering the replacement of 4 additional wells. The Area III Wellfield is located in the south-central portion of the City’s service area. It consists of 35 production wells, of which 18 are considered to be of primary use. Petitioners contend that both the "safe yield" (the quantity of water the City can withdraw without degrading the water resource) and the "reliable yield" (the quantity of water the City can dependably withdraw) of the Area II and III Wellfields are the permitted limits of 5.4 and 1.1 mgd, respectively. The City and the District contend that saline intrusion into the SAS has reduced the safe and reliable yields to significantly less than the permitted amounts at this time. Historically, the Area II Wellfield was the most productive wellfield. Prior to 1988, the City relied entirely on the Area II Wellfield and pumped almost 5 mgd from it at times. Since then, several Area II wells have shown signs of water quality degradation that has resulted in a reduction in pumping to better stabilize water quality levels. For the past five years, the City has only pumped approximately 3 mgd on an annual average basis from the Area II Wellfield. Chloride concentrations exceeding 250 mg/l have been recorded in 16 Area II production wells. Chloride concentrations exceeding 250 mg/l have been recorded in 22 Area III production wells. About 10 wells in the Area II and III Wellfields have been abandoned because of water quality degradation. At the Area II Wellfields there are 10 wells whose use is impaired because of water quality issues. At the Area III Wellfields there are 15 wells whose use is impaired because of water quality issues. Area III has had serious chloride problems, with concentrations at or near 200 mg/l for much of the mid-90's. In the Area III Wellfield, the Anastasia wells have the best water quality. However, these wells have also seen increasing concentrations of chlorides, with one well over 200 mg/l. According to information introduced into evidence by the City, it appears that Area III began to have chloride problems primarily due to over-pumping.5 The City pumped far in excess of permit limits from Area III during the early 1990's, including almost twice the permit limit in 1990 and 1.5 times the limit in 1991. While chlorides were between 77 and 92 mg/l in 1990-92, they began to rise in 1993 and were between 192 and 202 mg/l for the rest of the decade. Area III production declined in 1997 to approximately 0.66 mgd and declined further to a low of approximately 0.5 mgd in 1999. In 2000, chlorides fell to approximately 138 mg/l and then rose to approximately 150 mg/l in 2002-04, while production gradually rose to close to the permit limit in 2002 and 2003, before dipping to 0.75 mgd in 2004. In 2005, production was back up to 1 mgd, and chlorides were approximately 87 mg/l. During the five years from 2001 through 2005, the City has pumped an annual average rate of approximately 1 mgd from Area III. In contrast, Area II has not been over-pumped during the same time period. Area II production generally declined from a high of 4.146 mgd in 1992 to a low of 2.525 mgd in 2000, except for an increase of approximately 0.25 mgd between 1997 and 1998. During this time, chlorides generally declined from a high of 124 mg/l in 1993 to approximately 68 mg/l in 2000, with the exception of a rise to approximately 111 mg/l in 1999. Area II production then generally increased through 2003 to approximately 3.000 mgd, where it remained in 2004 before declining to approximately 2.770 mgd in 2005. Area II chlorides were approximately 113 mg/l in 2001, 109 in 2002, 86 in 2003, 76 in 2004, and 83 in 2005. During the five years from 2001 through 2005, the City has pumped only an annual average rate of 2.86 mgd. In 1995, the City entered into a contract with the City of Cocoa requiring the City to pay for at least 1 mgd each year, whether the City actually takes the water or not (the "take-or-pay" clause). Using the Cocoa water allowed the City to reduce production from Area III without a corresponding increase in production from Area II. Water conservation measures implemented since 1998, including conservation rates, have since reduced per capita water use. In 2002, the contractual take-or-pay requirement was reduced to 0.5 mgd. After 2002, purchases of Cocoa water have amounted to 0.576, 0.712, and 0.372 mgd on an annual average basis. As a result, since at least 1990 Area II has not been required to produce at its permitted limit. It is not clear exactly what the City believes to be safe and reliable yields at this time from Areas II and III. In its PRO, the City took the position that the total reliable yield is 3.5 to 4 mgd, of which 2.25 to 2.5 mgd is attributable to the Area II Wellfield and 0.75 mgd is attributable to the Area III Wellfield. However, its consultant, Mr. Patrick Barnes, testified that the City's current reliable yields are 3 mgd from Area II and 1 or 1.1 mgd from Area III. He testified that the safe yield from Area II would be approximately 3.5 mgd. The District has not formulated an opinion as to the exact of amount of water that can be produced from the Area II and III Wellfields on a sustainable basis. However, the District believes that recent production levels, which have resulted in a stabilization of chloride concentrations, may be the most production that can be sustained from these facilities without adverse water resource impacts. That would mean approximately 4.5 mgd on an annual average basis from Areas II and III combined. It might be possible for the City to expand the reliable yield of the Area II Wellfield by constructing additional wells or through some other measures. But Brevard County’s North Brevard Wellfield, located immediately north of the City’s Area II Wellfield, utilizes the same SAS used by the Area II Wellfield, and Brevard County recently received an increased permitted allocation from the District for this facility. This would limit the City’s ability to expand the current production of water from the Area II Wellfield. Other limitations on expansion of production from Areas II and III include: the relatively high risk of contamination of the SAS from pollution sources such as underground petroleum storage tanks; the limited space available in an increasingly urbanized area for the construction of new wells; the chronic bio-fouling and encrustation of wells due to the high iron content of the SAS; and the low specific capacity of each production well. For these reasons, it is not clear at this point in time whether it is possible to sustain more water production from Areas II and III than the City has pumped in recent years. B. Area IV Application and TSR On March 6, 2001, the City of Titusville submitted its application to modify CUP 10647. Included in this application was a proposal to add a new Area IV Wellfield in northwest Brevard County to pump up to 2.75 mgd from the UFAS. The District issued a series of seven Requests for Additional Information in between April 5, 2001, and March 23, 2004. On December 15, 2004, the District issued its initial TSR for the CUP modification application. That TSR proposed to authorize the use of 2.75 mgd from the UFAS and 0.18 mgd of groundwater from the SAS from the proposed Area IV Wellfield and 3.3 mgd of groundwater from the SAS from the existing Area II and Area III Wellfields to serve a projected population of 56,565 in 2008. There was no request to extend or renew the permit, which expires February 10, 2008. Miami Corporation filed a petition challenging this TSR. On May 13, 2005, the City submitted a revised application for a separate Individual CUP for the Area IV Wellfield, rather than modifying its existing CUP 10647 to include the new wellfield, with a permit expiration of December 31, 2010. On May 25, 2005, the staff issued a revised TSR. That TSR proposed a new permit to authorize up to 2.75 mgd of groundwater from the UFAS and 0.178 mgd of groundwater from the SAS from the proposed Area IV Wellfield to serve a projected population of 59,660 in 2010. The revised TSR noted that the proposed permit expiration date for the Area II and Area III Wellfields would remain February 10, 2008. Vergie Clark filed a petition challenging the revised TSR, as did Miami Corporation. After various notices on the TSR and the revised TSR to interested persons in Brevard County, in August 2005 the District issued additional notice to interested persons in Orange, Seminole and Volusia Counties. As a result, all required public notices have been issued. On March 14, 2006, the City again revised its application, and on May 1, 2006, the District issued its second revised, and final, TSR--which is the TSR now at issue. The TSR at issue recommended that a CUP be issued to Titusville for 2.75 mgd of groundwater from the UFAS and .18 mgd of groundwater from the SAS for wetland hydration and aquifer recharge from the Area IV Wellfield on an annual average basis to serve a projected population of 63,036 in 2010. This TSR provided that the proposed permit would expire December 31, 2010. TSR at Issue Water Use Allocation The CUP recommended by the TSR would only grant the City a water allocation from the Area IV Wellfield for 2009 and 2010. The recommended CUP would allow the City to withdraw water from the Area IV Wellfield at an annual average rate of 2.75 mgd during those years for public supply. (Other Condition 4) The CUP recommended by the TSR would limit the City’s potable water allocation from the Area IV Wellfield to a maximum rate of 3.85 mgd during the four consecutive months of the dry season, which can occur during any time of the year. If 3.85 mgd is withdrawn during this four-month period, the withdrawal rate for the remaining 8 months cannot exceed 2.21 mgd. (Other Condition 8) The CUP recommended by the TSR would limit the City’s potable water allocation from the Area IV Wellfield to a maximum rate of 4.41 mgd during any single month. (Other Condition 7) The CUP recommended by the TSR would limit the City’s potable water allocation from the Area IV Wellfield to a maximum rate of 6.5 mgd during any single day during a severe drought, when the existing sources (meaning Areas II and III) cannot be used without inducing water quality degradation or exceeding permitted quantities. (Other Condition 9) The CUP recommended by the TSR would allow the City to withdraw water from the SAS extraction wells at an annual average rate of up to 0.178 mgd in 2009 and 2010 for wetland hydration and surficial aquifer recharge. (Other Condition 6) The CUP recommended by the TSR would limit the withdrawal of water from the Area II, III and IV Wellfields to a combined annual average rate of 5.79 mgd in 2009 and a combined annual average rate of 6.01 mgd in 2010. The CUP recommended by the TSR would limit the withdrawal of water from the Area II, III and IV Wellfields to a combined maximum daily rate of 8.88 mgd in 2009 and 9.0 mgd in 2010. (Other Conditions 5, 9) The CUP recommended by the TSR would reduce Titusville's combined annual average and maximum daily allocations from the Area II, III and IV Wellfields in 2009 and 2010 by an amount equivalent to the quantity of water purchased from the City of Cocoa during each year. (Other Conditions 5, 9) Other Condition 10 in the recommended by the TSR notifies the City that nonuse of the water supply allocated by the CUP for two years or more is grounds for revocation by the District's Governing Board, permanently and in whole, unless the City can prove that its nonuse was due to extreme hardship caused by factors beyond the City's control. Permit Duration The CUP recommended by the TSR would not allow the City to withdraw water from the Area IV Wellfield earlier than January 1, 2009; as indicated, it would expire on December 31, 2010. (Other Conditions 2, 4). Saline Water Intrusion The CUP recommended by the TSR contains a permit condition requiring the City to implement the proposed saline water monitoring plan by sampling and analyzing Saline Water Monitor Wells SWMW 1-6 and UFAS production wells 401, 403, 405, 407, 409, 411, 413 and 415 quarterly for water levels, chloride and total dissolved solids. (Other Condition 11) The CUP recommended by the TSR contains a permit condition authorizing the District to modify the allocation granted to the City in whole or in part or to otherwise curtail or abate the impact in the event of saline water intrusion. (Other Condition 14) The CUP recommended by the TSR contains a permit condition requiring the City to cease withdrawal from any UFAS production well, if any quarterly water sample from that well shows a chloride concentration exceeding 250 mg/l. That same condition would limit the operation of any UFAS production well with a quarterly sample exceeding 250 mg/l to six hours per day with a minimum 24 hours recovery between pumping cycles if subsequent samples contain chloride concentrations between 200 mg/l and 249 mg/l. (Other Condition 25) Environmental Impacts and Avoidance and Minimization The CUP recommended by the TSR contains a permit condition requiring the City to implement the proposed environmental monitoring plan for hydrologic and photo- monitoring at 16 wetland sites within one year of permit issuance and to establish a baseline prior to the initiation of groundwater withdrawals. That same condition requires the City to collect water level data at each wetland site either on a daily or weekly basis and report to the District every six months in District-approved, computer-accessible format. (Other Condition 12) The CUP recommended by the TSR contains a permit condition authorizing the District to revoke the permit in whole or in part or to curtail or abate impacts should unanticipated adverse impacts occur to wetlands, lakes and spring flow. (Other Condition 23) The CUP recommended by the TSR contains a permit condition authorizing the District to require the City to implement the proposed avoidance and minimization plan should unanticipated impacts occur to Wetland A4-2 (a shallow marsh near the middle of the wellfield) within 90 days of notice by the District. That same permit condition authorizes the District to require the City to submit a wetland rehydration plan for any other adversely affected wetland within 30 days of notice by the District and to implement the plan without 90 days of approval by the District. The District would require the City to implement avoidance measures before the wetlands are actually allowed to suffer adverse impacts. (Other Condition 24) Impacts to Other Existing Legal Users of Water The CUP recommended by the TSR contains a permit condition authorizing the District to require mitigation of any unanticipated interference to existing legal users of water due to withdrawals from the Area IV Wellfield. Mitigation may include installation of a new pump or motor, installation of additional drop pipe, new electrical wiring, connection with an existing water supply system, or other appropriate measures. (Other Condition 15) Water Conservation Measures and Reuse The City is implementing extensive water conservation measures. The City’s water conservation plan includes public education measures (e.g., televised public service announcements, helping to create water conservation videos and distributing them to the public, commissioning an award winning native plant mural, providing exhibits and speakers for public events), toilet and showerhead retrofits, and a water conservation based rate structure. A water conservation rate structure provides the potable water customer with an economic incentive to use less water. The most common conservation rate structure is a tiered-rate whereby the cost per gallon of water increases as the customer uses more water. While the District reviews the rate structure to evaluate whether it will achieve conservation, it does not mandate the cost per gallon of water. An audit of the City’s potable water distribution system was conducted and recent water use records were evaluated to determine if all necessary water conservation measures were in place. The audit indicated that the potable water system has small unaccounted-for water losses, approximately 6.5 percent, and relatively low residential per capita water use. The City has implemented a water conservation plan that implements rule requirements; as a result, the City has provided reasonable assurance that it is implementing all available water conservation measures that are economically, environmentally, or technologically feasible. The City cannot use reclaimed water to meet its potable water demands associated with direct human consumption and food preparation. However, reclaimed water can be used to replace that part of the City’s allocation that is associated with irrigation-type uses. The City has operated a reclaimed water reuse system since 1996. It is projected that 67 percent of the available wastewater flows will be utilized by 2010 for irrigation, with the remainder going to a wetland system during wet weather periods when irrigation demands are low. The City is using reclaimed water to the extent it is economically, environmentally and technologically feasible. In the case of public supply, the District looks to the amount of water requested for each person in a projected population in determining whether the water will be used efficiently. The metric that the District normally considers when conducting this part of the evaluation is the per capita usage. Population Projections and Per Capita Water Use As indicated, the proposed CUP would expire on December 31, 2010. Although the City and District would anticipate an application for renewal to be filed, demand for water projected beyond December 31, 2010, is not relevant to the need for the proposed CUP. In the case of public supply, projected demand for water usually is calculated by multiplying the projected population times per capita water use. Gross per capita (“GPC”) use in gallons per day (gpd) is the type of metric normally used to project demand for public supply of water. It is based on residential use and all other water uses supplied by the utility, including commercial, industrial, hotel/motel, and other type uses. That includes supply necessary to meet peak demands and emergencies. DEP requires that every public water supply system have an adequate water supply to meet peak demands for fire protection and health and safety reasons. If peak demands are not met, a major fire or other similar catastrophe could depressurize a public water system and possibly cause water quality problems. Projections of need for water in the future must take into account peak demands and emergency needs. Water used for those purposes is included in the historical average daily flows (ADF) from which historical GPC is derived. Unless there is good information to the contrary, in projecting GPC one assumes that those uses will increase roughly in proportion to the residential use. City's Projection Contending that the University of Florida Bureau of Economic and Business Research (BEBR) does not estimate or project population for municipalities, and that BEBR projections are based on historical trends that would under-project population in the City, the City used a different source and method to project population in the City's water service area on December 31, 2010. For its method, the City had Courtney Harris, its Planning Director, project the number of dwelling units that would be developed and occupied in 2011, calculating the additional people associated with each unit (based on the 2000 Census, which identified 2.32 as the average number of persons per dwelling unit in the City), and adding the resulting number to the City’s existing service area population as of 2005. The City's method yielded various results depending on when proposed developments in the City were reviewed. Ultimately, the City projected a population of 60,990 at the end of 2010. The City's method depends on the ability of its Planning Director to accurately predict the timing of new residential construction and sales, which is not easy to do (as indicated by the different results obtained by the City over time), since there are many factors affecting residential development and the real estate market. The ultimate predictions of the City's Planning Director assume that residential development will continue at an extraordinarily high pace although there already was evidence of downturn. The City's method also assumed that all new units will be sold (which, again, is contingent on market conditions) and fully occupied (although a 90 percent occupancy rate would be a more realistic.) The method also does not account for decreases in population in a number of areas in the Titusville service area (while overall population increased, mostly as a result of growth that has been occurring in a single census tract.) The City's witnesses then calculated a per capita water use rate by averaging the actual rates for the 11 years from 1995 through 2005, which resulted in projected per capita water use rate of 100.35, and a projected demand of 6.12 mgd at the end of 2010. The justification for averaging over 11 years, instead of the last five years, was that the last five years have been unusually wet, which would depress demand to some extent. However, using 11 years also increased the average water use by taking into account the higher use rates common before conservations measures, including conservation rates, went into effect (in particular, 123.75 gpd for 1995, 122.36 gpd for 1996, and 109.94 gpd for 1998.) Since 1998, and implementation of the conservation rates and other measures, water use rates have been significantly lower. While the average over the last 11 years was 100.35 gpd, the average over the last five years (from 2001- 2005) was just 92.15 gpd. Averaged since 1998, the City's water use rate has been 93.34 gpd. While wetter-than-normal conditions would be expected to depress water use to some extent due primarily to decreased lawn irrigation, many of the City's water customers have private irrigation wells for this purpose. Besides, Mr. Peterson, the City's Water Resources Manager, testified that not many of the City's water customers use potable water for lawn irrigation due to the new conservation rates. Petitioners' Projection Miami Corporation's population expert, Dr. Stanley Smith, is the Director of BEBR. Dr. Smith projected the population for the City's service area by first developing an estimate of the population of the water service area in 1990 and 2000 using block and block group data, and then using those estimates to create estimates from 2001-2005. Dr. Smith then projected population in the City's water service area using a methodology similar to what BEBR uses for county projections. Dr. Smith's methodology used three extrapolation techniques. He did not use a fourth technique, often used at BEBR, called shift-share, because he believed that, given Titusville's pattern of growth, using shift-share might produce projections that were too low. In developing his final projections, Dr. Smith also excluded the data from 1990 to 2000 because growth during that period was so slow that he felt that its inclusion might result in projections that were too low. Dr. Smith's approach varied slightly from the typical BEBR methodology in order to account for the fact that the City's growth has been faster since 2000. Dr. Smith applied an adjustment factor based on an assumption also used by the City's expert that 97.3 percent of the projected population within the City's water service area in 2010 would be served by the City. Using his method, Dr. Smith projected the population of the Titusville water service area to be 53,209 on December 31, 2010. Based on recent population estimates, Dr. Smith believes that, if anything, his projections are too high. It was Dr. Smith's opinion from the data that the annual increases for Titusville and the Titusville water service area peaked in 2003 and that they had been declining since that time. That was especially true of 2006, when the increase was the smallest that it had been for many years. Petitioners' expert, Mr. Drake, calculated a per capita water use rate by averaging the actual rates for the most recent five years (2002-2006), which resulted in a per capita water use rate of 89.08 gpd, and a projected demand of 4.74 mgd at the end of 2010. He also calculated a per capita water use rate for 2006, which came to 88.65 gpd, which would give a slightly lower projected demand of 4.72 mgd. Ultimate Finding of Projected Water Demand Based on all the evidence, it is found that Dr. Smith's projection of the population that will use City water on December 31, 2010, is more reasonable than the City's projections. The City and District contend that, regardless of the calculated per capita water use rate, it is appropriate to base the City's allocation on a rate of 100.35 gpd because 90 to 100 gpd is very conservative per capita water use rate for a public water supply utility. However, the allocation should be based on the best estimate of actual demand, not a general rate commonly assumed for water utilities, even if conservative. The City and District also contend that it is appropriate to base the City's allocation on a higher use rate because the climatic conditions experienced in the City over what they considered to be the most recent five years (2001- 2005) have been average-to-wet. More rainfall generally means less water use, and vice-versa, but the greater weight of the evidence proved that the City's demand for water has not varied much due to climatic conditions in recent years (after implementation of conservation measures, including conservation rates.) (City Exhibit 19, which purported to demonstrate the contrary, was proven to be inaccurate in that it showed significantly more water use during certain drier years than actually occurred.) However, in 2000--which was after the implementation of conservation rates and also the City's driest year on record (in approximately 75 years)--the water use rate was approximately 97.5 gallons per person per day. An average of the last eight years (1999-2006), which would include all years clearly responsive to the conservation rates as well as the driest year on record, would result in a per capita water use rate of approximately 92.8 gpd, and a projected demand of approximately 4.94 mgd by December 31, 2010. The District argues in its PRO that, because a CUP water allocation is a legal maximum, it would be inappropriate to base the City's water allocation on demand during a wet or even an average year (which, it says, would set the permittee up to violate its permit requirements 50 percent of the time). If, instead, the City's water allocation were based on demand during 2000, the driest year on record, projected demand would be approximately 5.2 mgd on December 31, 2010. Those calculated water allocations--i.e., either the 4.94 mgd or the 5.2 mgd--would then be compared to the probable safe and reliable yield of 4.5 mgd from Areas II and III to determine the deficit on an annual average basis. Allowing a reasonable margin of error for the uncertainties of the predictions involved, a reasonable maximum annual average allocation for the proposed Area IV Wellfield would be 0.75 mgd. Mr. Jenkins suggested in rebuttal that, if the need for water is less than that set out in the proposed CUP in the TSR at issue, a CUP should nonetheless be issued but with lower water allocations. While the evidence supports a reduction of the annual average limit from 2.75 mgd to 0.75 mgd, there was insufficient evidence to show how the other water allocation limits in the proposed CUP should be changed. For the past 12 years, the City of Titusville has been able to purchase water under a contract with the City of Cocoa to meet all of its demands, including any peak or emergency water demands. Under the take-or-pay provision in the contract currently in effect, the City must pay for 0.5 mgd and presumably would take and use at least that amount so long as the contract remains in effect. This would reduce the City's projected water supply deficit through the end of 2010, and the City could rely on the Cocoa contract to cover any additional demand through the end of 2010 without Area IV. However, under the contract, the City can give notice on or before April 1 of the year in which it intends to terminate the contract effective October 1 of the same year. If a CUP for Area IV is issued, the City could terminate the current contract effective as early as October 1, 2008. It also is possible that the contract could be negotiated so that its termination would coincide with the time when the Area IV Wellfield becomes operational if not near October 1 of the year. As indicated, even if the contract remains in place, to the extent that the City receives water from the City of Cocoa for potable use during either 2009 or 2010, the allocations under the proposed TSR will be reduced an amount equivalent to the quantity provided to the City by Cocoa in that year. Finally, as indicated, the existing CUP for Areas II and III is set to expire in February 2008. Although it is anticipated that the City will apply to renew the existing CUP for Areas II and III, and that the District will approve a renewal at some level, it is not clear how much production will be approved for Areas II and III for the years 2009 and 2010. Meanwhile, the CUP proposed for Area IV provides that the combined annual groundwater withdrawals for public supply for the Areas II, III, and IV may not exceed 5.79 mgd for 2009 and 6.01 mgd in 2010. Based on the findings in this case, those figures should be reduced to no more than 5.2 mgd, and it must be anticipated that a similar condition would be placed on any renewal of the existing CUP for Areas II and III as well. Site Investigation At the time the City decided to apply for a CUP for Area IV, it was known that the UFAS in much of Brevard County was not suitable as a source of potable water supply, but there was believed to be a tongue of the UFAS in the northwest corner of the County and extending towards the southeast, and narrowing in that direction, that might be suitable for that purpose, particularly in the upper part of the aquifer. Because there was insufficient information to adequately evaluate the whether proposed Area IV, which was located along the Florida East Coast Railway (FEC) Right-of-Way (ROW), could be used for that purpose, the City’s consultant, Barnes, Ferland and Associates (BFA), designed a drilling and testing program to collect site-specific information in order to characterize the groundwater quality, identify the thickness of the freshwater zone in the UFAS, and determine hydraulic parameters for the groundwater system. In addition, DRMP conducted an environmental assessment of the Area IV Wellfield and surrounding property. The drilling and testing program designed by BFA for the Area IV Wellfield was similar to other hydrogeologic investigations conducted in the region with respect to wellfields operated by the City of Edgewater, the City of New Smyrna Beach, the City of Ormond Beach, the Orlando Utilities Commission and Orange County. The drilling and testing program for the Area IV Wellfield included Time-Domain Electromagnetic Mapping ("TDEM") performed by SDII Global, a consultant retained by the District. TDEM is not typically used for the hydrogeologic investigation of a new wellfield. The TDEM technique involves estimating the depth to the 250 mg/l and 5,000 mg/l chloride concentration in the groundwater system using electrical resistivity probes. The technique was applied at four locations along the FEC Right-of- Way. In addition to the TDEM study, BFA installed three test production wells along the FEC ROW, collected lithologic samples with depth, performed borehole aquifer performance and step drawdown tests at two test sites and recorded water quality with depth through grab and packer samples. The northernmost test production well was Test Site 1, which corresponds to Area IV production well 401. The middle test production well was Test Site 3, which corresponds to either Area IV Well 412 or Area IV Well 413. The southernmost test production well was Test Site 2, which is located approximately 1.5 miles south of the southernmost Area IV production well. Test Sites 1 and 2 were constructed first and Test Site 3 was drilled later because of unfavorable water quality conditions encountered at Test Site 2. Test Site 1 is located on the FEC ROW approximately 430 feet southeast of the Volusia-Brevard County line. At Test Site 1, BFA installed a test-production well (UF-1D), a UFAS monitor well (UF-1S), and a SAS monitor well (SA-1) in 2001. In 2005 BFA installed two additional SAS monitor wells (MW-1 and RW-1) near Test Site 1. The test production well was drilled to a depth of 500 feet below land surface and then back-plugged to a depth of 250 feet below land surface and cased to a depth of 105-110 feet below land surface. Test Site 2 is located on the FEC ROW approximately 2.8 miles southeast of the Volusia-Brevard County line. At Test Site 2, BFA installed a single UFAS Monitor Well (UF-2S). The monitor well was drilled to a total depth of 210-220 feet below land surface. Test Site 3 is located on the FEC ROW approximately 1.4 miles southeast of the Brevard-Volusia County line. At Test Site 3, BFA installed a test production well (UF-3D), a UFAS monitor well (UF-3S), and a SAS monitor well (SA-3). The test production well was drilled to a depth of 500 feet below land surface and then back-plugged to a depth of 210 below land surface.. Since Test Site 3 is either Area IV Well 412 or 413, and assuming production well 415 will be located 1,200 feet southeast of Test Site 3, this means that Test Site 2 is located at least one mile southeast of the southernmost Area IV production well. Test Sites 4 and 6 are located approximately three miles southeast of Brevard-Volusia County line. SAS test production wells were constructed at both sites to a total depth of about 20-30 feet below land surface. The site-specific hydrogeologic data collected by BFA as part of the drilling and testing program verified the groundwater basin and flow direction shown in Figure 15 of City Exhibit 523. DRMP’s environmental assessment of the Area IV Wellfield spanned the period from 2002 through 2006. In Spring 2002, DRMP evaluated areas within the predicted 0.2 foot drawdown contour by assessing wetland vegetation, photographing wetlands, noting wetland hydrologic conditions, investigating soil condition and wildlife utilization and evaluating surrounding land uses and natural communities. In Fall 2002, DRMP evaluated potential monitoring sites both on and off Miami Corporation's property by assessing wetland vegetation composition and hydrologic conditions, investigating soil conditions and wildlife utilization, evaluating surrounding land use and natural communities and locating suitable control sites. In Fall 2003, DRMP evaluated potential wetland monitoring sites near the southernmost Area IV production wells by assessing wetland vegetation composition and hydrologic conditions, investigating soil conditions and evaluating surrounding land uses and natural communities. In Spring 2005, DRMP assessed wetlands surrounding the Area IV Wellfield by evaluating wetland vegetation composition and hydrologic conditions, photographing wetlands, investigating soil conditions, evaluating surrounding land use and natural communities and collecting GPS points. In Fall 2005, DRMP investigated the Clark property by evaluating wetland vegetation and hydrologic conditions, photographing wetlands, investigating soil conditions and wildlife utilization and evaluating surrounding land uses and natural communities. In Spring 2006, DRMP developed a revised environmental monitoring plan and avoidance and minimization plan based on the new SDI MODFLOW Model by locating the final wetlands monitoring sites, developing the hydrologic and vegetative monitoring protocol, establishing the scope of the baseline study, reviewing the preliminary pipeline routing, construction and discharge inlet structures and preparing and submitting plan documents to the District. DRMP evaluated the occurrence of listed animal and plant species in the vicinity of the Area IV Wellfield as part of its environmental assessment. DRMP reviewed the Natural Areas Inventory for the Area IV Wellfield site, which identifies occurrences of listed species within a designated area. Additionally, DRMP made note of animal and plant species during the site visits in 2002, 2003, 2005, and 2006. DRMP evaluated the Farmton Mitigation Bank as part of its environmental assessment. DRMP reviewed the permit files for the Farmton Mitigation Banks, including the annual environmental monitoring reports prepared by Miami’s consultants. In 2005, DRMP conducted a field assessment of the Clark property including a thorough investigation of the fish pond, which Petitioners claim was adversely impacted during one or more of the APTs conducted by the City at the Area IV Wellfield. It was not necessary for the City’s environmental consultants to visit each and every wetland in the vicinity of the proposed Area IV Wellfield. Typically, only representative wetland sites are visited during the environmental assessment process. The scope of the City's hydrologic and environmental investigation of the Area IV Wellfield was adequate and consistent with industry standards and the District protocol for testing aquifers and characterizing aquifer performance and groundwater quality at the site. Nonetheless, Petitioners contend that there were serious deficiencies in the investigation's implementation and that additional investigation should have been performed. Hydrostratigraphy The SAS at the Area IV Wellfield is 40-to-50 feet deep and is composed primarily of unconsolidated sand, shell and silt. The intermediate confining unit (ICU) at the Area IV Wellfield consists of the Hawthorne Group and ranges in thickness from 40 to 60 feet. The top of the ICU is located 40- 50 feet below land surface and the bottom of the ICU is located 100 feet below land surface. This unit is composed of varying amounts of sand, shell, silt, indurated sandstone, clay, and some limestone. It tends to restrict the movement of water from the SAS to the UFAS. The UFAS at the Area IV Wellfield is a fairly homogenous limestone unit, which starts approximately 100 feet below land surface and extends to about 450 feet below land surface or 425 feet below mean sea level. It consists of the Ocala Group and grades into the upper portion of the Avon Park Formation. The middle confining unit (MCU) at the Area IV Wellfield starts at approximately 450 feet below land surface or 425 feet below mean sea level and ends approximately 1,000 feet below land surface. It comprises a denser, fine-grained dolomitic limestone within the Avon Park Formation. The MCU restricts the movement of water between the UFAS and LFAS. The location of the MCU at the Area IV Wellfield was determined by examining cuttings and video logs collected during drilling performed at Test Sites 1 and 3 and by measuring various properties of the aquifer with down-hole geophysical techniques. The MCU can be distinguished from the UFAS by the presence of both dolomite and limestone. The lithologic log for Test Site 1 indicates the presence of gray/tan limestone between 450 and 460 feet below land surface and light/gray limestone and dolomitic limestone between 460 and 470 feet below land surface. The lithologic log for Test Site 3 indicates the presence of tan dolomitic limestone between 450 and 460 feet below land surface and tan limestone and dolomitic limestone between 460 and 470 feet below land surface. After examining the video log for Test Site 1, Petitioners’ expert, Dr. Thomas Missimer, noted a “lithologic change” at 477 feet below land surface. Other characteristics of the MCU are a lower resistivity and a sharp decrease in flow. The data collected at Test Site 1 shows a reduction in resistivity at approximately 470 feet below land surface. The flow meter log for Test Site 1 exhibits a decrease in flow at approximately 450 feet below land surface. Petitioners’ experts, Thomas Missimer, Alge Merry, and Bruce Lafrenz contend that the top of the MCU at the Area IV Wellfield is located deeper than 450 feet below land surface or 425 feet below mean sea level. This contention is based on regional reports, the geophysical logs reported by BFA, and one of the packer tests conducted at the bottom of the test wells that showed a pumping rate of 85 gpm. The greater weight of evidence indicates the top of the MCU at the Area IV Wellfield starts at the elevation identified by BFA. The regional reports are not based on data collected from the immediate vicinity of the Area IV Wellfield. Additionally, the BFA's professional geologists who determined the top of the MCU included Joel Kimrey, who was the former head of the local USGS office, and had more experience with the hydrogeology of the MCU in Brevard and Volusia than any of the Petitioners’ geologic experts. Also, the BFA geologists had access to the drill cuttings, which were unavailable to the Petitioners’ experts when they made their determination. Finally, the pumping rate recorded during the packer test could be explained by an area of higher permeability within the MCU. More likely, the packer may have been partially open to the bottom of the UFAS. The Lower Floridan Aquifer System (LFAS) starts at about 1,000 feet below land surface and ends approximately 2,300 feet below land surface. Head Difference Data Head refers to the pressure within an aquifer. In an unconfined aquifer, it is the water table. In a confined or semi-confined aquifer, it is the level to which water would rise in a well penetrating into the aquifer. Head difference refers to the numerical difference between two water levels either in different aquifer at the same location or different locations in the same aquifer. In the context of the Area IV Wellfield, static head difference is the difference between the elevation of the water table in the SAS and the elevation of the potentiometric surface of the UFAS under non-pumping conditions at the same location. The static head difference reflects the degree of confinement in the ICU. If the static head difference between the SAS and UFAS is a large number, this indicates a high degree of confinement between the two systems. BFA took static head measurements at SAS and UFAS monitor wells located at Test Sites 1, 2 and 3 in January 2004, April 2004, and July 2006 and calculated the head difference based on those measurements. District expert, Richard Burklew, was present when the measurements were taken in April 2004 and July 2006 and verified the readings made by the City’s consultants. During all three sampling events a downward head gradient was noted at each site, which means the water table had a higher elevation than the potentiometric surface of the UFAS. In January 2004, the measured head difference at Test Sites 1, 2 and 3 were 6.2 feet, 5.5 feet and 5.9 feet, respectively. In April 2004, the measured head difference at Test Sites 1 and 3 were 8.1 feet and 8.1 feet, respectively. Finally, in July 2006, the measured head difference at Test Sites 1, 2 and 3 were 8.6 feet, 6.6 feet and 9.3 feet, respectively. The average of those observed head differences was 7.46 feet. At the time the head difference measurements were taken in July 2006, the region had experienced a rainfall deficit of 17 inches over the prior 12 months. Petitioners contend that the rainfall deficit may have skewed that head difference observation. However, according to the District’s expert, Richard Burklew, this would not necessarily have affected the head difference measurements because the hydrologic system would seek equilibrium, and the head difference would be the same. BFA collected static head difference measurements from Test Sites 1, 2 and 3 during both wet and dry seasons. The measurements do not show significant differences between seasons. Head difference data collected from hundreds of other Florida locations also do not show significant differences between seasons. This suggests that static head difference remains fairly constant at the Area IV Wellfield year round. Water level measurements taken by the City’s consultants from the wells on Clark’s property and reported in City Exhibit 52 do not determine static head difference between the SAS and UFAS because the exact construction of the wells was unknown, the completion depth of certain wells was unknown, the operational history of the wells was unknown, and the putative SAS well was located several hundred feet away from the UFAS well. For example, the depth of one of the wells is reported as 57 feet, which could easily be located in the ICU. If that is the case, then the head difference measured by comparing to the water level in this well would only be the head differential between the ICU and the UFAS. Finally, the Clark property is located in a more elevated region than Test Sites 1, 2, and 3, which means the water table will be lower and the head difference will be less than at the Area IV Wellfield. Water level measurements reported in the driller’s completion log for Wells 4175, 4176, 4177, and 5230 on Miami Corporation’s property do not determine static head difference between the SAS and UFAS because critical information concerning the construction of these wells is unknown. Additionally, the wells are much shallower than test production wells at Test Sites 1, 2 and 3. The water level measurements reported in the driller’s completion log for Wells 4175, 4176, 4177, and 5230 are not necessarily inconsistent with head difference measurements collected by BFA at Test Sites 1, 2 and 3. The head differences at these four well sites could be 6, 4, 7, and 6 feet, respectively, depending how the water measurements were made. Also, the measurements made by a driller could not be expected to be as accurate as measurements made by trained hydrologists. Further, if the soils in the vicinity of Well 4177 indicated a depth to water table of 5 feet below land surface, that would not necessarily be inconsistent with the head difference measurements collected by BFA at Test Sites 1, 2 and 3. Depth to Water Table The depth to water table is defined as the difference between the land surface elevation and the head value in the SAS. The water table in the Area IV Wellfield area is consistently close to land surface and often above land surface. The construction of numerous above-grade forest roads and roadside ditches on the property surrounding the Area IV Wellfield has had the effect of impounding surface water and raising the water table near land surface. The Area IV Wellfield and vicinity have a variety of soil types. The predominant wetland soil type is Samsula Muck, which is classified as a very poorly drained soil with a water table either at or above land surface. The predominant upland soil type is Myakka Fine Sand, which is characterized by a water table within a foot of land surface during four months of the year and within 40 inches of land surface during remainder of the year. The average depth to water table at the Area IV Wellfield is approximately 1 foot based on soil types. SAS levels at the three Farmton Mitigation Banks were measured at piezometers installed by Miami Corporation’s consultants from 2001 through 2005. This data confirms the water table at the Area IV Wellfield is consistently close to land surface and frequently above land surface. It indicates the depth to water table is typically less than 3 feet and in many cases within a foot or two. Also, it does not matter whether any of the piezometers were located near wetlands because they show seasonal variation in water levels, where the water table changes from slightly above land surface to below land surface over the course of a year. A water table depth of 6-14 feet below land surface is not realistic at the Area IV Wellfield based on soil conditions and vegetation communities. Such a depth to water would be indicative of a landscape composed primarily of xeric scrub communities with few, if any wetlands. These types of communities do not exist near the Area IV Wellfield. Aquifer Performance Tests The flow of water through an aquifer is determined by three primary hydraulic coefficients or parameters: transmissivity; storage; and leakance. An aquifer performance test (APT) is a pumping test where water is removed from the well at a set rate for a set period of time and drawdown is measured in the well and in neighboring monitor wells to calculate the hydraulic properties of the hydrologic formation. The main hydraulic properties determined through an APT are transmissivity, leakance, and storativity. These properties are used to characterize the water production capabilities of the hydrologic formations. These properties are also used in groundwater modeling to project impacts for longer periods of time and larger distances. Aquifer parameters can be determined from an aquifer performance test using analytical "curve-matching" techniques or a groundwater flow model such as MODFLOW. Curve-matching techniques involve the creation of a curve through measurement of drawdown and the matching of that curve to standard curves derived using analytical equations. Hydraulic conductivity or “K” is the term used to describe the ability of a hydrogeologic unit to conduct fluid flow. It is usually expressed in terms of horizontal hydraulic conductivity or “Kx” and “Ky” and vertical hydraulic conductivity or “Kz.” Transmissivity is the term used to describe the rate of movement of water for a given thickness of a hydrogeologic unit. It is the hydraulic conductivity of an aquifer times its thickness. Storativity is the term used to describe the amount of water that is released from any aquifer for a given unit change in head, or the compressability of the aquifer system. This value can normally be determined during a 4-5 day aquifer performance test. Specific yield is the term used to describe the long- term capacity of an aquifer to store water. This value cannot normally be determined during a 4-5 day aquifer performance test. Leakance is the term used to describe the vertical movement of water from above or below a given unit in response to changes in head or pumpage. APTs are standard practice for evaluating the suitability of a new area for development as a wellfield. Three APTs were conducted at Test Sites 1 and 3. No aquifer performance tests were conducted at Test Site 2. Petitioners question whether the APTs for the Area IV Wellfield were conducted by BFA in accordance with the applicable standard of care in the hydrogeologic profession. The District’s expert, Richard Burklew, believes the three APTs conducted at Test Sites 1 and 3 were adequate for purposes of determining appropriate aquifer parameters. Two APTs were conducted by BFA at Test Site 1. The first test was conducted on January 30-31, 2001, when Well UF-1D was pumped at about 700 gpm or approximately 1 mgd for 44-48 hours, and Wells UF-1S and SA-1 were used as monitor wells. The second test was conducted on April 8-12, 2003, when Well UF-1D was pumped at about 700 gpm or approximately 1 mgd for 96 hours, and Wells UF-1S and SA-1 were used as monitor wells. Using several analytical curve-matching techniques, BFA calculated a transmissivity of 7,300 ft2/day and a storativity of about 0.00036 on the basis of the 2001 APT at Test Site 1. They were unable to calculate a leakance value because the drawdown data did not reasonably fit the curve- matching techniques. For that reason, BFA performed another APT at Test Site 1 in 2003. Using several analytical curve-matching techniques, BFA calculated a transmissivity of 7,300 ft2/day, a storativity of 0.00045, and a leakance of 0.00029 day-1 on the basis of the 2003 APT at Test Site 1. One APT was conducted by BFA at Test Site 3 on April 10-13, 2001. Well UF-3D was pumped at about 700 gpm or approximately 1 mgd for 70 hours, and Wells UF-3S and SA-3 were used as monitor wells. Using several analytical curve-matching techniques, BFA calculated a transmissivity of 7,450 ft2/day, a storativity of 0.0002, and a leakance of 0.00026 on the basis of the 2001 APT at Test Site 3. However, because of problems with the test, leakance was not considered a good match for the analytical techniques. Leakance values determined by BFA from the APTs conducted at Test Sites 1 and 3 were based on the application of analytical curve-matching techniques. The leakance values determined through the conventional type curve-matching techniques employed by BFA are typically higher than the actual leakance values. They are also inherently limited because they assume the calculated leakance is due entirely to the ICU rather than a combination of the ICU and MCU as is the case at the Area IV Wellfield. The analytical techniques employed by BFA were unable to calculate separate leakance values for the ICU and the MCU. The best way to determine leakance values for each of these confining units was to use a MODFLOW model and observed head difference data. This was done by the City’s consultant, SDI, and is described in greater detail, infra. In January 2004, several APTs were conducted using two SAS wells referred to as Test Sites 4 and 6. These test sites are located more than 3 miles from the Clark property. Constant rate and variable rate APTs were conducted at both sites. During the constant rate tests, 230 gpm or about 0.33 mgd was pumped from the SAS well. Using several analytical curve-matching techniques, BFA calculated a transmissivity of 2,500 ft2/day for the surficial aquifer at those locations. Water Quality Data Consistent with the general understanding of the freshwater groundwater tongue extending from Volusia into Brevard County, the TDEM performed by SDII Global indicated that the depths to the 250 mg/l and 5,000 mg/l chloride concentrations decrease as one proceeds south along the FEC ROW. For example, the depths to the 250 mg/l and 5,000 mg/l chloride concentrations were 442 feet and 542 feet, respectively, at the northernmost test site, which is somewhat north of the City’s Test Site 1. The depth to the 250 mg/l and 5,000 mg/l chloride concentrations were 406 feet and 506 feet, respectively, at the southernmost test site, which is somewhat south of the City’s Test Site 2. Sixteen water quality grab samples were collected every 20-30 feet as the test production well at Test Site 1 was drilled, beginning at 120 feet below land surface and ending at 500 feet below land surface. This type of sampling is referred to as drill-stem testing. The chloride concentrations in the samples collected from 120 feet and 480 feet below land surface were 59 mg/l and 879 mg/l, respectively. The chloride concentrations in these samples did not exceed 250 mg/l until a depth of 460 feet below land surface was reached. Six water quality grab samples (drill-stem tests) were collected every 20-30 feet as the test production well at Test Site 2 was drilled, beginning 120 feet below land surface and ending 210 feet below land surface. The chloride concentrations in the samples collected from 120 feet and 210 feet below land surface were 124 mg/l and 845 mg/l, respectively. The chloride concentrations in these samples did not exceed 250 mg/l until a depth of 180 feet below land surface. Fourteen water quality grab samples (drill-stem tests), were collected every 20-30 feet as the test production well at Test Site 3 was drilled, beginning at 120 feet below land surface and ending at 500 feet below land surface. The chloride concentrations in the samples collected from 120 feet and 500 feet below land surface were 45 mg/l and 90 mg/l, respectively. The chloride concentrations in these samples never exceeded 90 mg/l. A packer test is a procedure used to isolate a particular well interval for testing. It is performed using an inflatable packer on the drill stem, which is placed at the interval to be blocked. The packer is inflated with water or air to isolate the interval to be sampled. A packer test can be used to collect water samples for analysis. Several water quality grab samples were collected in packer tests at specific depth intervals at Test Site 1. At the interval of 331-355 feet below land surface one sample was taken with a chloride concentration of 672 mg/l. At the interval of 331-400 feet below land surface, one sample was taken with a chloride concentration of 882 mg/l. Finally, at the interval of 442-500 feet below land surface two samples were taken with chloride concentrations of 2,366 mg/l and 2,2712 mg/l. Several water quality grab samples were collected in packer tests at specific depth intervals at Test Site 3At the interval of 270-295 feet below land surface, two samples were taken with chloride concentrations of 74 mg/l and 450 mg/l. At the interval of 340-400 feet below land surface, two samples were taken with chloride concentrations of 64 mg/l and 134 mg/l. Finally, at the interval of 445-500 feet below land surface, two samples were taken with chloride concentrations of 1,458 mg/l and 2,010 mg/l. No packer test samples were collected at Test Site 2, where it was clear that water quality was too poor to be used as a fresh groundwater source. The packer test samples collected at Test Sites 1 and 3 were collected using a higher pumping rate than typically recommended by the DEP and the United States Environmental Protection Agency (EPA). Consequently, the chloride concentrations in these samples are probably higher than the chloride concentrations found in the undisturbed groundwater at those depths. Since the packer sits on top of the borehole and restricts flow from above, it generally is reasonable to assume that a packer test draws more water from below than from above the packer. However, if transmissivity is significantly greater just above the packer, it is possible that more water could enter the packer from above. Seven water quality grab samples were collected every 12 hours during the 2001 APT at Test Site 1. The chloride concentrations in the first and last grab sample were 59 mg/l and 58 mg/l, respectively. Seven water quality grab samples were collected every 12 hours during the 2001 APT at Test Site 3. The chloride concentrations in the first and last grab samples were 19 mg/l and 52 mg/l, respectively. Nine water quality grab samples were collected every 12 hours during the 2003 aquifer performance test at Test Site The field-measured chloride concentrations in the first and last grab samples were 56 mg/l and 55 mg/l, respectively. The laboratory measured chloride concentrations in the first and last grab samples were 66 mg/l and 74 mg/l, respectively. The average chloride concentration for the water samples collected during the three APTs at Test Sites 1 and 2 was about 50 mg/l. Water is composed of positively charged analytes (cations) and negatively charged analytes (anions). When cations predominate over anions, the water is said to have a positive charge balance; when anions predominate over cations, the water is said to have a negative charge balance. Theoretically, a sample of water taken from the groundwater system should have a charge balance of zero. However, in real life this does not occur because every sample contains some small trace elements that affect its charge balance. Therefore, in the field of hydrogeology, a positive or negative charge balance of 10 percent or less is accepted as a reasonable charge balance error, and this standard has been incorporated in the permit conditions recommended by the District for the City’s permit. With one exception, all the water quality samples collected by BFA from Test Sites 1-3 had an acceptable charge balance. The one exception was a sample collected from the packer interval of 270-295 feet below land surface at Test Site 3 with a chloride concentration of 74 mg/l. This sample has a positive charge balance of 32.30 percent. The sample collected from the packer interval of 270- 295 feet below land surface at Test Site 3 has an overabundance of cations probably caused by grouting and cementing of the packer prior to taking the sample. Since chloride is an anion and not a cation, any error associated with this sample would not effect the validity of the 74 mg/l chloride concentration measured in this sample. This conclusion is also supported by the fact that two samples were collected from the same well at a packer interval of 340-400 feet below land surface with acceptable charge balances and they contained chloride concentrations of 64 mg/l and 134 mg/l. The District’s experts, Richard Burklew and David Toth, believe the 450 mg/l chloride concentration measured in a sample taken from the packer interval of 270-295 feet below land surface at Test Site 3 is a faulty measurement and should be discarded as an outlier. Dr. Toth testified that the sodium to chloride ratio indicates there was a problem with this measurement, which would call into question the reported chloride value. In 2004 and 2005, the City collected SAS water quality samples from Test Sites 4 and 6 and Monitor Wells MW-1 and RW-1 near Test Site 1. The samples were analyzed for all applicable water quality standards, which might preclude use of water from the SAS extraction wells to directly augment wetlands. The analyses found that the SAS water quality near the proposed extraction wells was very similar to the SAS water quality near the Area IV production wells and that water could be applied to the wetlands without any adverse water quality consequences. Area IV UFAS Flow Patterns and Basin Boundaries Although the United States Geologic Survey (USGS) potentiometric surface maps do not show any data points in the vicinity of the proposed Area IV Wellfield, and they are not sufficient by themselves to formulate opinions regarding the future operation or impacts of the proposed wellfield, Petitioners contend that these potentiometric surface maps demonstrate that the freshwater found in the UFAS at the Area IV Wellfield is due to local freshwater recharge only and not freshwater flow from the northwest. They point to a regional report indicating that there is a groundwater basin divide just north of the Area IV Wellfield. This report is based on a 1980 USGS potentiometric surface map. However, another regional report indicates that the groundwater basin divide occurs south of the Area IV Wellfield. This report is likely based on a 1998 USGS potentiometric surface map. Because of the lack of data points in rural northwest Brevard County, the City did not rely on any groundwater basin divide maps, but rather collected site specific information regarding the proposed Area IV Wellfield. The District’s expert and the Petitioners’ own expert (the sponsor of Petitioners' potentiometric surface map exhibits) noted several errors in the flow direction arrows added by Petitioners to the maps. In addition, after reviewing the potentiometric surface maps presented by Petitioners, the District’s expert concluded that, in addition to local freshwater recharge, the predominant flow into the vicinity of the Area IV Wellfield is generally from the northwest and southwest. To confirm his opinion, the District’s expert examined the head difference data collected in July 2006. At well UF-1S, the UFAS observation well at site 1, the elevation in the well was 16.27 NGVD. At site 3, which is southeast of site 1, the elevation in the UFAS observation well was 15.68 NGVD. At site 2, which is southeast of site 3, the elevation in the UFAS well was 13.87 NGVD. Since water generally flows from the highest to lowest head measurements, these measurements indicated that water would have been flowing from the northwest to the southeast in the vicinity of Area IV. However, the potentiometric surface can change both seasonally and yearly; likewise, the basin boundaries may also change. SAS and UFAS Drawdown Predicting drawdown in the SAS and UFAS in the vicinity of the proposed Area IV Wellfield is important to several permitting criteria, including interference with existing legal uses and impacts on wetlands, both of which relate to the public interest. During the permit application review process, the City submitted a succession of models to provide reasonable assurance that the proposed Area IV Wellfield would not result in unacceptable drawdown. Initially, BFA prepared and submitted groundwater flow simulations of the Area IV Wellfield prepared using an analytical model known as the “Multi-Layer/SURFDOWN Model.” Although the District initially accepted the submission as providing reasonable assurance to support the District's initial TSR, Miami Corporation petitioned and criticized the City's model as not actually providing reasonable assurance, both because of its predicted SAS drawdown and because it was an analytical model (which can only represent simple conditions in the environment, assumes homogenous conditions and simple boundary conditions, and provides only a model-wide solution of the governing equation). By comparison, a numerical model allows for complex representation of conditions in the environment, heterogeneous conditions and complex boundary conditions, and cell-by-cell iterative solutions of the governing equation that are typically performed by a computer. Over the past 10 to 15 years, a numerical model called MODFLOW has become the standard in groundwater modeling throughout the United States and much of the world. All of the Florida water management districts utilize MODFLOW or are familiar with it, so it is a model of choice today for groundwater flow modeling. Despite Miami Corporation's petition, the City and the District maintained that reasonable assurance had been given that operation of Area IV would not result in unacceptable drawdown. Miami Corporation's petition was scheduled for a final hearing in June 2005 that was continued until September 2005 after the first revised TSR was issued in May 2005. The final hearing was continued again until February 2006 to allow discovery and hearing preparation by Vergie Clark, who filed her petition in July 2005. As the case proceeded towards a February 2006 final hearing on the pending petitions, the City eventually made what actually was its second attempt to develop a calibrated MODFLOW model of the Area IV Wellfield. Unbeknownst to the District, BFA already had attempted to develop a MODFLOW Model of the Area IV Wellfield in 2004, with the assistance of Waterloo Hydrogeologic, Inc. (WHI) (which later was retained as Petitioners’ consultant in this case in a reverse of the Hartman client switch). When BFA ended its efforts with WHI, their efforts to calibrate a MODFLOW model for Area IV that would predict acceptable drawdown was unsuccessful, and none of those modeling efforts were submitted or disclosed to the District. In the fall of 2005, the City turned to another consultant, SDI, to attempt to develop a calibrated MODFLOW Model of the Area IV Wellfield. SDI initially prepared a so- called MODFLOW model equivalent of the Multi-layer/SURFDOWN Model prepared by BFA. It was presented to District staff at a meeting held in January 2006 for the purpose of demonstrating to District staff that the MODFLOW model equivalent of the Multi- layer/SURFDOWN Model generated results for the Area IV Wellfield that were not very different from the results obtained by BFA using their Multi-layer/SURFDOWN Model. Petitioners criticized several weaknesses in the MODFLOW equivalent model and maintained that the modeling efforts to date did not give reasonable assurance of no unacceptable SAS drawdown. By this time, the District had decided to retain Dr. Peter Huyakorn, a renowned modeling expert. Based on his recommendations, the District required the City to produce a calibrated MODFLOW model of Area IV (as well as numerical solute transport modeling, which will be discussed below). The scheduled final hearing was continued until September 2006 to allow time for this work to be completed, discovered, and evaluated. After the continuance, the City had SDI prepare a calibrated MODFLOW model to predict the drawdown that would result from operation of Area IV. SDI produced such a model in March 2006. This model predicted less drawdown. Specifically, a steady-state simulation of a 2.75 mgd withdrawal from the proposed 15 UFAS production wells and a 0.18 mgd withdrawal from the four proposed SAS extraction/wetland augmentation wells predicted the maximum drawdown of the surficial aquifer to be less than 0.5 foot (which, as discussed infra, would be acceptable). (UFAS drawdown, which is not an issue, was predicted to be an acceptable 12 feet.) But Petitioners questioned the validity of the model for several reasons, including its suspect calibration. Dr. Huyakorn also had questions concerning the calibration of SDI's March 2006 MODFLOW model, but subsequent work by SDI satisfied Dr. Huyakorn and the District, which issued the TSR and proposed CUP at issue in May 2006 based in part on SDI's March 2006 MODFLOW model, despite Petitioners' criticisms. The final hearing was continued until September 2006 to give Petitioners time to complete discovery on SDI's March 2006 MODFLOW model (as well as the City's new solute transport modeling, which is discussed, infra). To calibrate its March 2006 MODLFOW, SDI first used a transient MODFLOW model to simulate data from the 4-day aquifer performance test (APT) from the Area IV Wellfield sites (the transient APT calibration). (A transient model is used to analyze time-dependent variable conditions and produces a time- series of simulated conditions.) Then, after calibrating to the APT data, SDI used a steady-state, non-pumping MODFLOW model (a time-independent model used to analyze long-term conditions by producing one set of simulated conditions) to simulate the static head difference between the SAS and UFAS (the steady- state head difference calibration). If the head difference simulated in the steady-state calibration run did not match the measured head difference, the ICU leakance was adjusted, and then the revised parameters were rechecked in another transient APT calibration run. Then, another steady-state head difference calibration run was performed in an iterative process until the best match occurred for both calibration models. In order to achieve calibration, SDI was required to make the ICU leakance value several times tighter than the starting value, which was the value derived in the site-specific APT using conventional curve-matching techniques (and relatively close to the values ascribed to the region in general in the literature and in two regional models that included Area IV near the boundary of their model domains--namely, the District's East Central Florida (ECF) model, which focused on the Orlando area to the south and west, and its Volusia model, which focused on Volusia County to the north). SDI's calibrated ICU leakance value derived from calibration to observed static head differences is more reliable than an ICU leakance value derived from an APT using conventional curve-matching techniques. That leaves a question as to the quality of the static head difference measurements used for SDI's calibration. BFA took static head measurements at SAS and UFAS monitor wells located at Test Sites 1, 2 and 3 in January 2004, April 2004, and July 2006. On each occasion, a downward head gradient was noted at each site, meaning the water table (i.e., the SAS) had a higher elevation than the potentiometric surface of the UFAS. In January 2004, the measured head difference at Test Sites 1, 2 and 3 were 6.2 feet, 5.5 feet and 5.9 feet, respectively. In April 2004, the measured head differences at Test Sites 1 and 3 were 8.1 feet and 8.1 feet, respectively. In July 2006, the measured head differences at Test Sites 1, 2 and 3 were 8.6 feet, 6.6 feet and 9.3 feet, respectively. The average of these observed head differences for the Area IV Wellfield was 7.46 feet. BFA's static head difference measurements included both wet and dry seasons. The measurements do not show significant differences between seasons and suggest that static head difference remains fairly constant at the Area IV Wellfield year round. This is typical of head difference data collected from hundreds of other Florida locations because the hydrologic systems seek equilibrium. Petitioners questioned taking an average of the head difference measurements because the region had experienced a rainfall deficit of 17 inches over the 12 months prior to time the measurements in July 2006 were taken. By itself, a rainfall deficit would not affect head difference measurements because the hydrologic system would seek equilibrium. But there was evidence of a possibly significant rainfall near Area IV not long before the July 2006 measurements. If significant rain fell on Area IV, it could have increased the static head differences to some extent. But there was no evidence that such an effect was felt by Area IV. Petitioners also contend for several other reasons that the static head differences used by SDI as a calibration target were "not what they are cracked up to be." They contend that "limited spatial and temporal extent . . . renders them inappropriate calibration targets." But while the site-specific static head difference measurements were limited, and more measurements at different times would have increased the reliability of the average static head difference used in SDI's steady-state calibration, the head difference measurements used were adequate. For a groundwater model of Area IV, they were as good as or better than the head differences used by Petitioners' expert modeler, Mr. LaFrenz of Tetratech, who relied on SAS and UFAS head levels from the regional-scale ECF model, which were measured by the United States Geological Survey (USGS) in May and September 1995. Petitioners also contended that the measured head differences used by SDI for the steady-state calibration of the March 2006 MODFLOW model were significantly higher than other measured head differences in the general vicinity of Area IV. One such location is Long Lake, which has saltwater and an obviously upward gradient (i.e., a negative head difference between the SAS and UFAS), whereas SDI's MODFLOW depicts it as having a five-foot downward gradient (positive head difference). However, all but one of those measurements (including from Long Lake) were from locations five or more miles from Area IV. In addition, the accuracy of the measurements from the closer location (and all but one of the more distant locations) was not clear, so that the seemingly inconsistent head differences measurements may not be indicative of actual inconsistency with the head difference measurements used by SDI. Petitioners also accused the City and its consultants of "playing games with specific yield" to achieve calibration with a tighter-than-appropriate ICU leakance value. But the City and the District adequately explained that there was no merit to the accusations. It was appropriate for SDI to use just the relatively small specific storage component of SAS storativity (the 0.001 value) in its transient calibration runs, instead of the larger specific or delayed yield component. Storativity is not utilized at all in the MODLFOW steady-state calibration runs and steady-state simulations. Based on the foregoing, it is found that Petitioners' factual disputes regarding SDI's calibrated ICU leakance value do not make the City's assurance of no unacceptable drawdown provided by its MODFLOW simulations unreasonable. That leaves several other issues raised by Petitioner with regard to the SDI's March 2006 MODFLOW model. In calibrating its MODFLOW model, SDI utilized a value for the MCU leakance that was twice as leaky as the published literature values for the area, which Petitioners claim would reduce simulated SAS drawdown. Although the use of a higher MCU leakance value in the model may result in a prediction of less SAS drawdown, the actual effect, if any, on the predicted drawdown, was not made clear from the evidence. In any event, an MCU leakance value for Area IV calibrated to site-specific data is more reliable than regional values. Petitioners also accused the City and its consultants of using inappropriate or questionable boundary conditions, topography, and depth to the water table. They also contend that incorrect topography--namely, a nonexistent five-foot ridge or mound northwest of Area IV--provides an artificial source of water for SDI's March 2006 MODFLOW model. But the boundary conditions for SDI's March 2006 MODFLOW model were clear from the evidence and were appropriate; and SDI's topography and water table depth were reasonably accurate (and on a local scale, were as or more accurate than the USGS topographic maps Petitioners were comparing). Besides, Dr. Huyakorn ran the Tetratech model with SDI's leakance value instead of Tetratech's value and got virtually the same drawdown results, proving that differences in topography between the two models made virtually no difference to the drawdown predictions of either model. As for the so-called "flow from nowhere," particle-tracking simulations conducted by experts from both sides established that, with pumping at 2.75 mgd, no water would enter the Area IV production zone from anywhere near the five-foot ridge area for at least 100 years. This gave reasonable assurance that the five-foot ridge or mound had no effect on the simulated results from SDI's March 2006 MODFLOW model. Petitioners also contend that the City's failure to simulate drawdown from pumping during the dry season, as opposed to a long-term average of wet and dry seasons, constituted a failure "to provide reasonable assurances as to the conditions that can be expected as a result of the anticipated operation of the wellfields." But the evidence was clear that long-term, steady-state groundwater model simulations are appropriate and adequate to provide reasonable assurance for CUP permitting purposes. See "Drawdown Impacts," infra. By definition, they do not simulate transient conditions such as dry season pumping. The SDI model predicts a maximum drawdown, from a 2.75 mgd withdrawal from all fifteen UFAS production wells and a 0.18 mgd withdrawal from the four SAS extraction wells, of slightly less than 0.5 feet in the SAS and of 12.0 feet in the UFAS in the immediate vicinity of the Area IV Wellfield. SDI’s model predicts a drawdown of 0.11 feet (approximately 1 inch) in the SAS and a drawdown of 2.2 feet in the UFAS at Ms. Clark’s property, which is located approximately 1 to 1.5 miles north of the Area IV Wellfield. It is found that SDI's March 2006 MODFLOW model for Area IV is the best such model in evidence. That is not to say that the drawdown predicted by SDI's model is a certainty. The other models were not proven to be better than SDI's, but they did demonstrate that simulated results would vary significantly in some cases if SDI's calibration and calibrated ICU leakance values were incorrect. Having more good hydrologic information would have made it possible to reduce the uncertainties present in SDI's model, but it is found that SDI's March 2006 MODFLOW model was sufficient to give reasonable assurance as to SAS and UFAS drawdown from pumping at 2.75 mgd from the UFAS and 0.18 mgd from the SAS for wetland augmentation. Drawdown Impacts As indicated, once drawdown is predicted with reasonable assurance, both interference with existing legal uses and impacts on wetlands, which relate to public interest, must be evaluated. Interference with Legal Uses Using SDI's March 2006 MODFLOW model, the City gave reasonable assurance that the drawdown predicted from pumping at 2.75 mgd from the UFAS and 0.18 mgd from the SAS for wetland augmentation will not interfere with existing legal users. The nearest existing legal users are located about one mile northwest and two miles east/southeast of the nearest proposed production well. The City’s MODFLOW modeling scenarios indicate that maximum drawdown in the SAS will be less than 0.5 feet and minimal (at most 2.2 feet) in the UFAS at the nearest active existing legal users. Obviously, drawdown would be much less at 0.5 to 0.75 mgd from the UFAS (with probably no wetland augmentation required). As indicated, the drawdown predicted by SDI's March 2006 MODFLOW model is not a certainty. Although not likely based on the more persuasive evidence, if actual drawdown approximates the drawdown predicted by the Tetratech model, there could be interference with existing legal users. (The Tetratech model predicts that the long-term average reduction in the water table of approximately 1.6 feet of drawdown near the center of the wellfield and drawdown of 0.4 feet to 0.5 feet extending out more than a mile from the proposed Area IV Wellfield.) There probably still would be no interference with existing legal users with pumping at 0.5 to 0.75 mgd from the UFAS (with probably no wetland augmentation required). In the event of that much actual drawdown and unanticipated interference from the City’s pumping, “Other Condition” 15 of the proposed permit requires that it be remedied. See Finding 36, supra. There is no reason to think such interference could not be remedied. Environmental Impacts from Drawdown Miami Corporation’s property in the vicinity of the proposed Area IV Wellfield is a mosaic of pine flatwoods uplands interspersed with wetlands. The wetlands are mostly cypress swamps, with some areas of hardwood swamp, marshes, and wet prairies. Miami Corporation's property is managed for timber and is also used for cattle grazing and hunting. Miami Corporation has constructed a network of roads and ditches on its property, but overall the wetlands are in good conditions. The areas east and west of the proposed Area IV Wellfield consist of cypress strands, which are connected wetlands. Compared to isolated wetland systems, connected wetlands are typically larger, deeper, and connected to waters of the state. They tend to have hardwood wetland species. Connected wetlands are less vulnerable to water level changes brought about by groundwater withdrawals because they tend to be larger systems and have a greater volume of water associated with them. They are able to withstand greater fluctuations in hydroperiods than isolated herbaceous wetland systems. Isolated wetland systems are landlocked systems. They tend to be smaller in size and shallower than connected wetland systems. Isolated systems tend to be more susceptible to changes in hydrology than larger connected systems. The upland plant communities present near the proposed Area IV Wellfield include pine flatwoods that have been altered by Miami Corporation's timber operations. There is a large area surrounding the Area IV Wellfield to the north that consists of forest regeneration after timbering. There was evidence of the presence of the following listed animal species at the site of the proposed Area IV Wellfield: wood storks, roseate spoonbills, ibis, bald eagles, Sherman fox squirrels, American alligator, sandhill cranes, wood storks, black bear, and indications of gopher tortoises. The habitat in the vicinity also supports a number of other listed species that were not observed. The following listed plants species were also observed during the environmental assessment and site visits: hooded pitcher plants, water sundew, pawpaw and yellow butterwort. Ms. Clark’s property adjoins a cut-over cypress swamp on the western side of her property, and there is also a small man-made fish pond in her backyard. Some clearing has taken place in the wetland system on the back portion of Ms. Clark’s property. What appears to be a fire break on Ms. Clark’s property encroaches upon the wetland system. The wetlands on Ms. Clark’s property have experienced some human activities such as trash dumping and clearing, which have resulted in a degradation of those systems. Some trees within the wetland systems on the back portion of Ms. Clark’s property have been logged. For the most part, the hydrology appears to be normal. However, some invasive species have encroached upon the system due to the clearing that has taken place. There was no evidence of listed plant or animal species present on Ms. Clark’s property. If drawdown is of the magnitude predicted by the SDI's March 2006 MODFLOW model, unacceptable environmental impacts from drawdown would not be anticipated. At 0.5 or 0.75 mgd, there clearly would not be any unacceptable environmental impacts. In addition, “Other Condition” 12 of the proposed permit requires the City to perform extensive environmental monitoring. The environmental monitoring plan proposed for the Area IV Wellfield provides reasonable assurance that changes to wetland hydrology and vegetation due to groundwater withdrawals will be detected before they become significant. “Other Condition” 12 of the proposed permit prohibits the City from pumping any water from the production wells until the monitoring network is in place. The baseline monitoring will give a clear indication of the existing conditions prior to the production wells coming on-line. Once the production wells are online, the City will continue the same procedures that they conducted prior to the production wells coming online. This will allow the City and the District to monitor the effects of pumping. The City’s proposed environmental monitoring plan is adequate to detect drawdown impacts and is consistent with environmental monitoring plans that have been developed for other wellfields throughout the State of Florida. Since the City has given reasonable assurance that there will not be environmental harm from drawdown, the proposed permit does not propose mitigation. If unanticipated harm is detected, “Other Condition” 24 of the proposed permit requires the City to implement an avoidance and minimization plan to rehydrate the wetlands and restore the water levels to normal levels and natural hydroperiods by augmenting the water in the affected wetlands with water pumped from SAS wells and piped to the affected wetlands. “Other Condition” 24 includes specific timeframes for implementing wetland rehydration in the event unanticipated impacts were to occur. In addition, the City could, on its own, change its pumping schedules. If an impacted wetland is near a particular well, the City could reduce or shut off water withdrawals from that well and thereby restore water levels in the wetland. Direct augmentation of wetlands has been used at other facilities such as those of Tampa Bay Water and Fort Orange. The direct augmentation at these other sites appears to be effective. Direct augmentation of wetlands has proven to be a feasible means of offsetting adverse changes in wetlands due to groundwater withdrawals, at least in some circumstances. There is a viable source of water that can be utilized to augment these wetland systems, namely a large canal south of the production wells. Based on the predicted drawdown, SDI estimated the quantity of water needed for implementation of the avoidance and minimization plan to be 0.18 mgd. The water quality in the canal is comparable to the water quality within any wetland systems that would be affected by drawdown. The City plans to have its augmentation plan in place prior to the production wells coming online. In that way, if changes are observed within the wetland systems, the augmentation plan could be implemented in relatively short order to alleviate any impacts that might be occurring as a result of the production wells. The success of the augmentation plan depends on the extent of actual drawdown. If actual drawdown approximates Tetratech's predictions, environmental impacts would not be acceptable, and there would not be reasonable assurance that the augmentation plan would be sufficient to mitigate the environmental impacts. If drawdown is of the magnitude simulated in the City’s MODFLOW model, reasonable assurance was given that, if needed, the avoidance and minimization plan developed for the Area IV Wellfield would be capable of offsetting any adverse changes in wetlands and other waters detected through the environmental monitoring plan. If the City pumps not more than 0.75 mgd, the avoidance and minimization plan developed for the Area IV Wellfield probably would be unnecessary but certainly would be capable of offsetting any adverse changes in wetlands and other waters that would be detected through the environmental monitoring plan. If unanticipated environmental harm occurs due to excessive actual drawdowns, and the harm cannot be avoided either by the augmentation plan or by altering the pumping schedule, or both, the District can revoke all or part of the permit allocation under “Other Condition” 23. This ability gives reasonable assurance that no unacceptable environmental harm will occur even if actual drawdown approximates Tetratech's predictions. Saltwater Up-coning and Intrusion Predicting saltwater movement towards the production zone of the proposed Area IV Wellfield is important to several permitting criteria, including interference with existing legal uses and the ability of the resource to provide the requested allocation of freshwater, both of which relate to the public interest. During the permit application review process, the City submitted a succession of models to provide reasonable assurance that the proposed Area IV Wellfield would not result in unacceptable saltwater intrusion. Initially, BFA prepared and submitted solute transport simulations using an analytical model known as the “UPCONE Model.” The District initially accepted the submission as providing reasonable assurance to support the District's initial TSR. Despite Miami Corporation's petition, the City and the District maintained that reasonable assurance had been given that operation of Area IV would not result in unacceptable saltwater intrusion based on the "UPCONE Model." As indicated, supra, Miami Corporation's petition was scheduled for a final hearing in June 2005, but the hearing was continued until February 2006. As the case proceeded towards a final hearing in February 2006, the City not only turned to SDI to develop the numerical MODFLOW model, it also turned to SDI to develop a numerical solute transport model that would couple the MODFLOW groundwater flow equations with advection dispersion solute transport equations to simulate the movement of variable density saline groundwater in response to stresses. In addition to the initial boundary conditions, aquifer parameters and stresses specified for a groundwater model, a solute transport model requires solute parameters such as chloride concentrations, dispersivity and effective porosity. SEAWAT is a solute transport model code that combines the MODFLOW, which provides the groundwater flow component, with the MT3DMS code, which provides the mass transport component. When coupled with MODFLOW, the MT3DMS code tracks the movement of variable density water and performs internal adjustments to heads in the flow model to account for water density. Like MODFLOW, SEAWAT is capable of simulating the important aspects of the groundwater flow system, including evapotranpiration, recharge, pumping and groundwater flow. It also can be used to perform both steady-state or transient simulations of density- dependent flow and transport in a saturated zone. It was developed in the late 1990s and is rapidly becoming the standard for solute transport modeling throughout the United States. It is used by many water management agencies in the State of Florida. Initially, SDI used SEAWAT version 2.1 to simulate movement of saline water towards the Area IV Wellfield. The first such simulation was prepared in March 2006 using manually- adjusted head values along the eastern model boundary. It incorporated SDI's March 2006 MODFLOW model. The District, in consultation with Dr. Huyakorn, required SDI to perform what was termed a "sensitivity run" with reduced chloride concentrations in the eastern boundaries (5,000 mg/l versus 19,000 mg/l) to better match actual measurements recorded in wells in the vicinity. In April 2006 SDI prepared and submitted those simulations. After reviewing the March and April 2006 SEAWAT 2.1 simulations, Petitioners' consultants criticized the manner in which starting chloride concentrations in the vicinity of the Area IV Wellfield were input into the models. In those models, SDI had input initial chloride concentration at 50 mg/l throughout the depth of the UFAS. The model was then run for 100 years with no pumping to supposedly arrive at a reasonable starting chloride concentration for the UFAS. Then, the model was run for 25 years with pumping at 2.75 mgd. However, the initial chloride concentrations at the beginning of the pumping run still did not comport well with actual measurements that were available. After Petitioners raised the issue of the starting chloride concentrations assigned to the UFAS in SDI's March and April 2006 SEAWAT 2.1 runs, the final hearing was continued until September 2006 to give Petitioners time to complete discovery on those models (as well as on SDI's March 2006 MODFLOW model, as discussed supra). During a deposition of Dr. Huyakorn in July 2006, he recommended that the District require SDI to perform another simulation (also termed a "sensitivity run") using starting chloride concentrations more closely comporting with known measurements. (There also were some changes in the constant chloride concentrations that were part of the boundary conditions on the western side of the model domain.) This resulted in SDI's early August 2006 SEAWAT 2.1 simulation of 15 years of pumping at 2.75 mgd. Petitioners also criticized the City for not using a newer version of SEAWAT, called SEAWAT 2000, as well as for using chloride concentrations as inputs for its SEAWAT 2.1 model simulations instead of total dissolved solids (TDS). (SEAWAT 2.1 required input of TDS, not chlorides; SEAWAT 2000 allowed chlorides to be input. Not until the last day of the final hearing was it pointed out by Dr. Huyakorn that using chlorides instead of TDS caused SDI's SEAWAT 2.1 simulations to over- predict saltwater intrusion.) As a result of Petitioners' criticisms, the City had SDI re-run both the April and early August SEAWAT 2.1 models in late August 2006 using SEAWAT 2000 (which the City and the District also termed "sensitivity runs.") Because the SEAWAT 2000 simulations would be time- barred from use in the City's case-in-chief under pre-hearing requirements, and whether they could be used in rebuttal could not be determined at that point in time, the City requested another continuance, this time until December 2006, to give Petitioners time to discover the SEAWAT 2000 model simulations. During Petitioners' discovery of SDI's August SEAWAT 2000 model simulations, it came to SDI's attention that SDI was not calculating mass outputs from the model correctly. Those errors were corrected by SDI in September 2006. SDI's corrected August 2006 SEAWAT 2000 simulation predicted that, after 15 years of pumping at 2.75 mgd, the chloride concentration in the Area IV production wells would increase from 54 mg/l to 227 mg/l. After the 15-year pumping run, SDI's corrected August 2006 SEAWAT 2000 simulation predicted that the chloride concentration in several of the southernmost production wells would exceed 250 mg/l. At 17.5 years of the pumping run simulation, the simulation predicted that the entire wellfield would have chlorides in excess of 250 mg/l. That prediction does not, however, mean the chloride concentration in these wells will exceed 250 mg/l in actual operation. The SDI model contains several conservative assumptions that magnified the potential chloride concentrations in those wells. First, it was assumed all the production wells would be drilled to 250 feet below land surface, while the City will likely drill the southernmost wells to a shallower depth. Additionally, the wellfield production rate used in the model was not optimized for water quality. Finally, the model was not set up to simulate a wellfield operation plan that turned wells on and off based on the saline water monitoring plan. For the sake of simplicity, the model assumed that all the wells would operate 24 hours a day, 7 days a week, for the entire 15 year period. Petitioners continued to maintain for several reasons that SDI's SEAWAT models do not provide reasonable assurance that operation of the Area IV Wellfield will not result in unacceptable saltwater intrusion. Chlorides versus TDS Petitioners criticized SDI's corrected SEAWAT 2000 model for still not inputting chlorides correctly. While SEAWAT 2000 allows the input of chlorides instead of TDS (and input of chlorides instead of TDS is recommended since chloride is a more stable chemical than some of the other components of TDS), they must be input correctly. However, while Petitioners demonstrated that the chlorides were not input correctly, causing the model to under-calculate fluid density, Dr. Huyakorn clarified in rebuttal that under-calculating fluid density caused SDI's SEAWAT 2000 models to over-predict saltwater intrusion into the wellfield. Starting Chloride Conditions Petitioners continued to question the representation of initial chloride concentrations in the SEAWAT models. SDI's SEAWAT models included multiple vertical grid layers to represent conditions better than the layering used in the MODFLOW set-up. The SAS was represented by layer 1, the ICU by layer 2, the UFAS by layers 3 through 14, the MCU by layer 15, and the LFAS by layers 16 and 17. SDI used a chloride concentration of 0 mg/l for the SAS and ICU in its August 2006 SEAWAT model, which probably does not represent the actual initial condition but is probably close enough since the SAS is recharged by rainfall that typically has very low (1 to 2 mg/l) chloride levels. SDI used a chloride concentration of 2,500 mg/l for the MCU and a chloride concentration of 5,000 mg/l for the LFAS in its August 2006 SEAWAT model, which are reasonable initial chloride values for the Area IV Wellfield. To develop the initial chloride concentration conditions of the UFAS for its August 2006 SEAWAT model, SDI first plotted the available water quality data (63 well-data points) on a map of the Area IV Wellfield area. After examining the distribution of the data, SDI divided the UFAS into two layers to represent the upper UFAS (above –200 feet NGVD) and the lower UFAS (below –200 feet NGVD). Then, using various scientific studies containing chloride concentration maps, groundwater recharge/discharge maps (recharge indicating an area is more likely to have low chlorides in the UFAS and discharge indicating an area is more likely to have high chlorides), and maps showing the shape and extent of the freshwater lens in the area, plus SDI’s own knowledge of groundwater flows and expected higher chloride concentrations along the coast and St. Johns River, SDI used scientifically accepted hand-contouring techniques to represent the initial chloride concentration conditions of the upper and lower UFAS on maps. SDI’s two hand- contoured chloride concentration maps were reviewed and accepted by the District’s experts and reflect a reasonable representation of the initial chloride concentration conditions in the UFAS in the Area IV Wellfield. Using the two hand- contoured chloride concentration maps, SDI input the chloride concentration values from those maps into its August 2006 SEAWAT model. The chloride concentration values from the upper UFAS map were input into layers 3 through 7 of SDI’s August 2006 SEAWAT model. The chloride concentration values from the lower UFAS map were input into layers 11 through 14 of SDI’s August 2006 SEAWAT model. SDI input the average of the chloride concentration values from the upper and lower UFAS layers into the middle UFAS (layers 8 through 10). It is appropriate to average the chloride values between the upper and lower UFAS in the Area IV Wellfield because the saline water interface is not that sharp and occurs near the bottom of the UFAS (unlike conditions 11 miles to the south). Petitioners accuse SDI, the City, and the District of ignoring unfavorable chloride data in setting up its August 2006 SEAWAT 2000 model. The evidence was that all chloride data was considered and evaluated. Mr. Davis and the District's experts did not rely on the 450 mg/l chloride packer test measurement taken from the interval between 270 and 295 feet at Test Site 3 in preparing the contour maps of the UFAS because the chloride measurement was deemed inaccurate because the sodium to chloride ratio is out of balance. Mr. Davis and the District's experts did not utilize the 2,336 mg/l and 2,717 mg/l chloride concentration packer test measurements at 442-500 feet below land surface at Test Sites 1 and 3 to prepare the chloride contour maps for the UFAS because they believed these measurements from the MCU. Mr. Davis and the District's experts deemed it inappropriate to utilize a 845 mg/l chloride value reported for Test Site 2 to prepare the chloride contour for the lower portion of the UFAS because this sample was collected at just 210 feet below land surface and because a 500 mg/l contour line separates a 882 mg/l measurement at Test Site 1 from a 134 mg/l measurement at Test Site 3. The decision not to include the Test Site 2 data also is supported by the particle tracking modeling prepared by the Petitioners and the City using the groundwater component of the SDI SEAWAT model and the TetraTech model, which show that water from Test Site 2 will not enter the Area IV production wells for at least 100 years with pumping at 2.75 mgd. The chloride contour maps developed by Mr. Davis and the District experts were consistent with previous studies conducted by the USGS and the District in the region. For example, the chloride contours shown on City Exhibit 142 for the upper portion of the UFAS are generally consistent with Figure 35 of the 1990 USGS Report by Charles Tibbals and Figure 15 of the 1999 District Report by Toth and Boniol. The two chloride contour maps developed by Mr. Davis and the District's experts are a reasonable representation of the existing water quality of the UFAS in the region of the Area IV Wellfield based on the available data. Mr. Davis used the 882 mg/l chloride concentration packer test measurement from the interval between 331 and 400 feet at Test Site 1 as the starting chloride concentration in four grid cells at the bottom of the UFAS, which Petitioners' experts referred to as a "pinnacle" or "column," that were assigned a chloride value of 700 mg/l. While the representation may not have been realistic, and the "pinnacle" or "column" quickly "collapses" when the model begins to run, the representation was a concession to the existence of the datum even though it appeared at odds with water quality collected from a packer test at Test Site 3 at the same depth interval, which was much fresher. District staff agreed with Davis’ approach to representing the saltier packer test measurement from Test Site 1. The initial chloride concentrations developed for the UFAS by Mr. Davis and District staff are not inconsistent with the water quality data collected by the Petitioners’ consultants from Long Lake. The lake is located in an area of the map where the chloride concentration in the UFAS, which discharges into the lake at that location, is between 1,000 and 5,000 mg/l. Mr. Davis decided not to use 2,000 mg/l to represent the bottom layer of the UFAS even though the bottom packer tests performed at Test Sites 1 and 3 showed an average value of 2,000 mg/l at the approximate boundary of the UFAS and the MCU. Instead, he decided to associate this chloride concentration with the MCU because even if the packer had penetrated a portion of the UFAS, he did not believe the measurement was representative of static water quality conditions at that depth. The packers had been pumped for over 4 hours at 25 gpm at Test Site 1 and over 4 hours at 85 gpm at Test Site 3, which could have doubled or tripled the static chloride concentration. As was later shown in sensitivity runs by Petitioners' expert, Dr. Guo, if SDI had incorporated the 2,000 mg/l value at the bottom of the UFAS, the model simulation would have shown unrealistically high initial chloride concentrations in the production wells at the start of pumpage when compared to the water quality measured during the APTs conducted at Test Sites 1 and 3. (While only one well was pumping at a time, versus the 15 in the model simulations, the single APT well was pumping at approximately three times the rate of the 15 wells in the model simulation.) Based on all the evidence, it is found that the chloride concentrations used in SDI’s August 2006 SEAWAT model reflect a reasonable representation of the initial chloride concentration conditions in the UFAS in the Area IV Wellfield and were properly input into that model using an appropriate method. Location of the MCU Related to the last point is Petitioners' claim that the top of the MCU (i.e., bottom of the UFAS) is incorrectly represented in SDI's SEAWAT models at 450 feet below sea level (approximately 425 feet below land surface). They point to literature values indicating that the depth to the MCU is up to 150 feet greater. However, these reports did not include site- specific data or test wells in the vicinity of the Area IV Wellfield or in northern Brevard County. It was reasonable to consider and rely on site-specific information regarding the depth to the MCU in this case. BFA determined the approximate location of the MCU by examining cuttings collected during drilling at APT well sites 1 and 3 and by measuring various properties of the aquifer with down-hole geophysical techniques. Based on the site-specific information obtained, the depth to the MCU was determined to be approximately 450 to 475 feet below land surface or –425 to -450 feet NGVD. The lithologic log for well site 1 indicates the presence of gray/tan limestone between 450 to 460 feet below land surface and light/gray limestone and dolomitic limestone from 460 to 470 below land surface. The lithologic log for well site 3 indicates the presence of tan dolomitic limestone from 450 to 460 feet below land surface and tan limestone and dolomitic limestone from 460 to 470 feet below land surface. According to Petitioners' own expert, Dr. Missimer, the change to a mixture of limestone and dolomite is evidence of the MCU. After examining the video log for well site 1, Dr. Missimer noted a “lithologic change” at 477 feet below land surface (while still disputing BFA's conclusion that the MCU started there.) One characteristic of the MCU is a lower resistivity. At well site 1, a reduction in resistance occurred at approximately 470 feet below land surface. Another characteristic of penetrating the MCU is decrease in flow. The flow meter log for well site 1 suggests a decrease in flow at approximately 450 feet below land surface. On the other hand, it also is true that wells drilled completely into the MCU probably would not produce more than approximately 5 gallons per minute (gpm), whereas the packer test at the bottom of Wellsite 1 was yielding 25 gpm, and the packer test at the bottom of Wellsite 3 was producing 85 gpm. It is possible that the bottom packers were open to both the UFAS and the MCU, which could explain the higher flows. Petitioners maintain that BFA stopped drilling too soon (500 feet below land surface, or 475 feet below sea level) to ascertain the actual depth to the MCU. While it is true that drilling deeper would have made BFA's determination as to the depth to the MCU more convincing and certain, BFA's approximation of the depth to the MCU was reasonable for purposes of SDI's SEAWAT model. To the extent that BFA might have been wrong on the depth to the MCU, there was no convincing evidence that the error would have made SDI's SEAWAT model results unreliable. To the contrary, Dr. Huyakorn testified that, even if SDI put the MCU 75 feet too high, the label given to the interval is not critical to the reliability of the modeling results. More important are the parameters for transmissivity and leakance assigned to aquifers and confining units. Dr. Huyakorn testified that, given the aquifer parameters assigned to the intervals, SDI's SEAWAT modeling results would be reasonably reliable. Saline Movement Impacts As indicated, once chloride concentration changes are predicted with reasonable assurance, both interference with existing legal uses and the ability of the resource to provide the requested allocation of freshwater, which relate to public interest, must be evaluated. Significant saline water intrusion is defined as saline water encroachment which detrimentally affects the applicant or other existing legal users of water, or is otherwise detrimental to the public. (Rule 9.4.2, A.H.). Saline water may encroach from upconing or the vertical movement of saline water into a pumping well, and it may encroach laterally to the well from a saline waterbody like the ocean. The proposed use associated with the four surficial aquifer extraction wells is so minimal that it clearly would not cause saline water intrusion or harm the quality of this proposed source of water. The focus of attention is the production wells. The evidence was sufficient to provide reasonable assurance that the proposed consumptive use from the Area IV Wellfield will not cause significant saline water intrusion; further aggravate currently existing saline water intrusion problems; induce significant saline water intrusion to such an extent as to be inconsistent with the public interest; or harm the quality of the proposed source of water. First, the long-term constant rate pump tests, which were conducted as part of the APT, give some indication of the potential for saltwater intrusion. While only one well was pumping during the tests, water quality did not degrade at pumping rates that far exceeded what would be approved as part of the proposed permit. During four-day pump tests in which the wells at sites 1 and 3 were pumped at approximately 1 mgd, chlorides never exceeded approximately 74 mg/l. Second, while (as with drawdown predicted by the groundwater flow modeling) saltwater movement predicted by the City’s SEAWAT simulations is not a certainty, the simulations gave reasonable assurance that the requested allocation could be withdrawn from the Area IV Wellfield without excessive changes to water quality (specifically chlorides) and that there is an adequate thickness of freshwater at the Area IV Wellfield that could supply the requested allocations of water for 15 years without saline water intrusion, especially since it is unlikely that a number of the wells will actually be constructed to the 250-foot depth assumed in the model, particularly as one moves south along the railroad right-of way. Third, it is even more unlikely that saltwater intrusion will occur before the proposed permit expiration in 2010. Due to the time required to construct the facility, it is anticipated that the Area IV Wellfield will become operational in 2009. Assuming the City seeks to renew the permit, there would be more information on saltwater intrusion for the District to consider on permit renewal. Since the City provided reasonable assurance as to its proposed withdrawals from Area IV, there clearly is reasonable assurance that withdrawal of not more than 0.75 mgd from Area IV would not result in significant saline intrusion. The TSR includes proposed “Other Condition” 11 which requires the installation of saline monitor wells. The spatial distribution of these wells is such that the beginning of water quality degradation or saltwater intrusion, either from upconing or lateral intrusion, would not occur without it being detected by these wells. In addition to these monitor wells, proposed “Other Condition” 14 requires water quality samples to be collected from each production well. These wells are to be sampled quarterly for a suite of parameters, including chlorides. “Other Condition” 25 is proposed as a “safety net” should unanticipated saltwater intrusion occur. If any production well shows a concentration of 250 mg/l chlorides, then this proposed condition would prohibit further use of the well until the chloride concentration drops. If the monitoring shows a chloride concentration in a production well of 200-to- 249 mg/l, the well will be placed on restricted use. A production well may be placed back into regular service once the chloride concentration in the well is below 200 mg/l. Other Issues Other issues raised and maintained by Petitioners in this case include: whether the City has provided reasonable assurance that it owns or controls the property upon which the proposed wellfield will be located; whether the Area IV Wellfield is an economically feasible option; whether the City has provided reasonable assurance that it will be able to implement the project before the expiration date of the proposed permit; whether the proposed CUP is inconsistent with the District's designation of Priority Water Resource Caution Areas; whether the proposed CUP constitutes an impermissible modification of the existing CUPs for Areas II and III; and whether the City failed to pay the appropriate permit fee. Ownership or Control The City has obtained an easement from the Florida East Coast Railway (FEC) to use FEC right-of-way for the City's proposed production wells. It does not yet have ownership or control of land needed for all wetland and saline monitoring sites, or for wetland augmentation if necessary, but intends to acquire the right to use all land needed through negotiation or exercise of eminent domain. Petitioners contend that the FEC easement is insufficient for several reasons: the easement is "without warranty or covenants of title of any kind"; it is impossible to define the precise boundaries of the easement because the easement is defined in terms of distance from the center of a railroad bed that existed in 1866 but no longer exists; and the precise location of proposed production wells is not definite. While the easement is "without warranty or covenants of title of any kind," the evidence is that, if contested, the precise boundaries of the easement would be difficult but not necessarily impossible to define. It is reasonable to anticipate that at least Miami Corporation will contest the legality and extent of the FEC easement. Petitioners allege that there is confusion about the location of the proposed wells because some well locations identified in the City’s permit application did not match the coordinates assigned to certain production wells on the District’s on-line database. Actually, there is no confusion regarding the location of the wells; the well locations identified in the permit application were the well sites used for modeling purposes and for review of the application. District staff explained that the well site locations identified in the District’s database would be finalized after the wells are constructed and the exact locations have been identified using GPS technology. Contrary to Petitioners' contentions, the District’s rules do not require that an applicant own the property where the proposed production wells or monitoring wells are to be located. The District has issued many CUPs where either the subject property or the property associated with the monitoring requirements of the permit are not owned by the applicant. Recent examples include the CUPs for Orange County Utilities and the Orlando Utilities Commission. This makes sense when the applicant has the power of eminent domain or some other credible means of obtaining necessary ownership or control, such as an option contract. The District’s permit application form has a section that requires the applicant to identify who owns or controls the land on which the facility will be located. The District uses this information for noticing and contact information. Contrary to Petitioners' contentions, this section of the permit application form is not intended to create a substantive permitting standard requiring property ownership before a consumptive use permit can be issued. Petitioners argue that proof of ownership or control is necessary to determine whether a drawdown from a proposed water use will adversely affect stages or vegetation on lands other than those owned, leased, or otherwise controlled by the applicant. However, the evidence was that these impacts can be assessed based on the facts of this case. The City's need to eventually obtain ownership or legal control to exercise the rights granted by the proposed CUP may be problematic in this case and is a factor to be considered in the next two issues raised and maintained by Petitioners: whether the Area IV Wellfield is an economically feasible option; and whether the City has provided reasonable assurances that its project can become operational before the expiration date of the proposed permit. But it is not a reason to automatically deny the City's proposed CUP. Economic Feasibility Petitioners argue that the proposed Area IV Wellfield is too expensive and that the expense should be a factor in deciding whether it is in the public interest. But cost to the City is not a factor in determining whether to issue the CUP proposed in this case. Statutes and rules cited by Petitioners on this point do not apply to this CUP determination. See Conclusions of Law 277-279, infra. Implementation Before Expiration Date Litigation of a case filed by Miami Corporation to contest the legality and extent of the City's FEC easement will add to the (cost and) time necessary to implement the project. This additional time was not specifically taken into account by the City in estimating the time it would take to implement the project. The (cost and) time for litigation of the legality and extent of the City's FEC easement could be spared by exercising eminent domain instead. That probably would add to total the cost of eminent domain but might not add appreciably to the time necessary for acquisition of required ownership or control. In an imprecise way, the time for eminent domain proceedings necessary to gain ownership or control of land for monitoring sites and wetland augmentation (without time for litigation of a contest over the legality and extent of the FEC easement, or for using eminent domain instead) was factored into the time estimated for implementation of the project. With this rough estimate, the evidence was that the project could be expedited and completed in 33 months from issuance of a CUP. It is possible but not probable that the project could be implemented in less than 33 months. It is possible and more probable that it will take longer than 33 months to implement the project. In a worst case scenario, it could take as much as 59 months complete the project. But 33 months is a reasonable, if optimistic, estimate (without time for litigation of the legality and extent of the FEC easement, or for using eminent domain instead). As found, the proposed CUP expires at the end of 2010. Given the 33-month estimate for implementation (without time for litigation of a contest over the legality and extent of the FEC easement), the CUP would have to be issued by March 2008 to be completed before expiration. Given that estimate, it would be in operation for six months before expiration. It is likely that the City will apply to renew both the existing CUP for Areas II and III and the proposed CUP for Area IV. It appears from Petitioners' Response to the other PROs that one purpose for their arguments that the proposed CUP for Area IV cannot be implemented before its expiration is to buttress their arguments, already addressed, that there is no need for the proposed CUP for Area IV. Priority Water Resource Caution Area Designation As part of its water supply planning process, the District designates priority water resource caution areas. A priority water resource caution area is an area where existing and reasonably anticipated sources of water and water conservation efforts may not be adequate to supply water for all existing legal uses and anticipated future needs and to sustain the water resources and related natural systems. The area surrounding the Area IV Wellfield was designated as a priority water resource caution area in the District’s 2003 Water Supply Assessment and 2005 Water Supply Plan based on groundwater modeling prepared by District planning staffing using the ECF and Volusia County Regional Models. The fact the Area IV Wellfield is located in a priority water use caution area does not mean a consumptive use permit cannot be issued for this facility. In fact, over one- third of the District is located within a priority water resource caution area, and permits continue to be issued in those areas. Rather, the essence of the designation is the recognition of a concern, based on the regional models, that the proposed consumptive use of water might violate the wetland and lake constraints and that water resources other than fresh groundwater will be needed to supply the expected need for water in the area and in the District over the next 20 years. That does not mean that no additional groundwater withdrawals should be permitted in a designated area. Rather, it means that other resources should be developed and used along with whatever remaining additional fresh groundwater can be permitted. It is not an independent reason, apart from the permitting criteria, to deny the City's application. Impermissible Modification of Existing CUP Petitioners contend that the proposed CUP for Area IV includes an impermissible modification of the existing CUP for Areas II and III because “Other Condition” 5 limits average annual withdrawals from the Area II, III, and IV Wellfields, combined, to 5.79 mgd in 2009 and 6.01 mgd in 2010. (As indicated, the limitations would have to be reduced to no more than 5.2 mgd based on the more reasonable projected need.) However, the City’s current CUP for the Area II and III Wellfields expires in February 2008, which is before the Area IV Wellfield would become operational, so that "Other Condition" 5 will have no practical effect on the existing CUP for Areas II and III. In essence, "Other Condition" 5 serves to advise the City that it should not view the allocation for the Area IV Wellfield in addition to the City’s existing allocations for the Area II and Area III Wellfields and that any renewal of the existing CUP for Areas II and III will have to take the Area IV allocation into account. Appropriate Permit Fee Petitioners have alleged that the City has not paid the correct permit processing fee. In March 2001, the City paid the District $200 when it submitted its initial permit application to modify its existing CUP. In May 2005, the City paid the District an additional $800 when it amended its application and withdrew its request to modify its existing permit. All required permit processing fees have been paid for this CUP application 99052. Miscellaneous As to other issues raised by Petitioners in the case, the evidence did not suggest any danger of flooding, any proposed use of water reserved by rule for other uses, any effect on any established minimum flows or levels, or inadequate notice. Standing As found, Miami Corporation owns property immediately adjacent to the proposed Area IV Wellfield, and Ms. Clark owns property a little more than a mile away. Both alleged and attempted to prove that SAS drawdown from the proposed CUP would degrade wetlands on their property and interfere with their legal use of groundwater, and that saline intrusion from the proposed CUP would degrade the water quality of the UFAS resource which they use for potable water. As found, Petitioners did not prove those allegations; however, the evidence was that both Petitioners have substantial interests (the quality of water in the aquifer from which their wells withdraw water and wetlands on their property) that would be affected by the proposed CUP at least to some extent.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the District issue the City a CUP for Area IV as provided in the second revised TSR, except for a lower water allocation at this time, namely: 0.75 mgd on an annual average basis, with appropriately lower allocations on the other bases in the TSR, and with a combined annual average rate for Areas II, III, and IV in "Other Condition" 5 of 5.2 mgd for 2009 and 2010 instead of 5.79 mgd in 2009 and 2010, and appropriately lower combined maximum daily rates for Areas II, III, and IV in "Other Condition" 9. Jurisdiction is reserved to hear and rule on the pending motions for sanctions if renewed no later than 30 days after entry of the final order in this case. DONE AND ENTERED this 31st day of July, 2007, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 31st day of July, 2007.
The Issue The issue is whether Respondent, Krista Howard,2/ is entitled to issuance of the Consolidated Environmental Resource Permit and Recommended Intent to Grant Sovereignty Submerged Lands Authorization, Permit No. 53-0351424-001-EI, as announced by Respondent, Department of Environmental Protection, in the Consolidated Notice of Intent to Issue Environmental Resource Permit and Lease to Use Sovereignty Submerged Lands issued on July 28, 2017, and subsequently amended on January 11, 2018.3/
Findings Of Fact The Parties Petitioner Defenders is a Florida non-profit corporation that has been in existence since the mid-1980s or earlier. Defenders' primary purpose is to protect and preserve Crooked Lake so that it may remain an Outstanding Florida Water ("OFW") for all members of the public to use and enjoy. Defenders has more than 25 members who reside in Polk County, Florida. Its membership consists of approximately 100 family memberships, mostly comprised of persons who live on or near Crooked Lake. Petitioners Gerards are riparian landowners on Crooked Lake, whose property is located immediately adjacent to, and slightly to the northwest of, Respondent Howard's property. The Gerards' home address is 1055 Scenic Highway North, Babson Park, Florida 33827. Respondent Howard is the applicant for the Consolidated Authorization for the Dock. Howard's property, which is riparian to Crooked Lake, is located at 1045 Scenic Highway North, Babson Park, Florida 33827. Respondent DEP is the administrative agency of the State of Florida statutorily charged with, among other things, protecting Florida's water resources. As part of DEP's performance of these duties, it administers and enforces the provisions of chapter 373, part IV, Florida Statutes, and the rules adopted pursuant to that statute. Pursuant to that authority, DEP determines whether to issue or deny applications for ERPs. Pursuant to section 253.002, Florida Statutes, DEP also serves as staff to the Board of Trustees of the Internal Improvement Trust Fund ("Board of Trustees") and, in that capacity, reviews and determines whether to issue or deny, applications for approval to use sovereignty submerged lands.5/ DEP Review of the Application The Dock is proposed to be located on sovereignty submerged lands and in surface waters subject to State of Florida regulatory jurisdiction. Therefore, an environmental resource permit and a sovereignty submerged lands lease are required. On or about February 14, 2017, Todd Rickman, Howard's professional contractor who designed the Dock, filed an Application for a Sovereignty Submerged Lands Lease for Existing Structures and Activities6/ ("Application") with DEP's Southwest District Office, seeking approval to construct and operate the Dock. On or about March 15, 2017, DEP requested additional information regarding the project. Howard submitted the requested items, and the Application was determined complete on May 30, 2017. Notice of DEP's receipt of the Lease portion of the Application was provided as required by section 253.115. The comment period commenced on June 15, 2017, and ended on July 6, 2017. As previously noted, on July 28, 2017, DEP issued the Consolidated Notice of Intent, proposing to issue the Consolidated Authorization to construct and operate the Dock. On January 11, 2018, DEP amended the Consolidated Notice of Intent to accurately reflect the "clearly in the public interest" permitting standard for the ERP portion of the Consolidated Authorization, which is applicable to projects proposed in OFWs. Background Crooked Lake Crooked Lake (also, "Lake") is an approximately 4,247-acre freshwater lake in Polk County, Florida. It is an irregularly shaped karst lake roughly resembling an inverted "L," with the longer axis running north to south. It is located on the Lake Wales Ridge. Crooked Lake is designated an OFW by Florida Administrative Code Rule 62-302.700(9)(i)9.7/ The Lake is classified as a Class III waterbody pursuant to Florida Administrative Code Rule 62-302.400(15).8/ The elevations and bottom contours in Crooked Lake vary substantially throughout the Lake. Thus, water depths may, and generally do, vary substantially from one location to another throughout the Lake. The water levels in Crooked Lake fluctuate frequently and, at times, dramatically, depending on rainfall frequency and amounts. A graph prepared by Petitioners' Witness James Tully, using Southwest Florida Water Management District ("SWFWMD") historical water level data for Crooked Lake measured in National Geodetic Vertical Datum of 1929 ("NGVD") shows water levels historically fluctuating from as low as approximately 106 feet in or around 1991, to as high as 123 feet NGVD in or around 1951, 1961, and 2004. Rickman generated a water level graph using the Polk County Water Atlas ("Atlas") website. This graph, which covers the period of 2008 through mid-2017, shows that the water levels in Crooked Lake, for this most recent ten-year period, fluctuated approximately five feet, with the lowest levels falling slightly below 114 feet NGVD for relatively short periods in 2012 and 2013, and the highest level rising to approximately 119 feet NGVD in mid-2017. The competent, credible evidence shows that although water levels in Crooked Lake may occasionally rise to levels at or around 123 feet NGVD, those conditions have been associated with extreme weather events such as hurricanes, are atypical, and are relatively short-lived. The maximum water level in Crooked Lake is subject to control by a weir located south of the Lake. Discharge from the weir occurs at a control elevation of 120 feet NGVD. As such, the water level in parts of Crooked Lake may, at times, temporarily exceed 120 feet NGVD, but will eventually decrease to 120 feet NGVD as the water flows south and is discharged through the weir. To the extent rainfall does not recharge the Lake, water levels may fall below 120 feet NGVD. The ordinary high water line ("OHWL"), which constitutes the boundary between privately-owned uplands and sovereignty submerged lands, has been established at 120.0 feet NGVD for Crooked Lake. Crooked Lake is used for recreational activities such as fishing, swimming, boating, and jet ski use, and there are public and private boat ramps at various points on the lake that provide access to the Lake. There is no marina having a fueling station on the Lake. The credible evidence shows that the northeast portion of the Lake, where the Dock is proposed to be located, experiences a substantial amount of boat and jet ski traffic. This portion of the Lake also is used for swimming, water- skiing, wakeboarding, the use of "towables" such as inner tubes, and for other in-water recreational uses. The Proposed Dock Howard holds fee title by warranty deed to parcel no. 333028-000000-033140 located at 1045 Scenic Highway, Babson Park, Florida.9/ This parcel has approximately 110 linear feet of riparian shoreline on Crooked Lake. The Dock is proposed to be constructed and operated on sovereignty submerged lands adjacent to this riparian upland parcel, which is located on the eastern shore of the northeastern portion of Crooked Lake. The Dock, as proposed, is a private single-family residential dock that will be used by Howard for water-dependent recreational purposes, such as specifically, boating, fishing, swimming, and sunbathing. The Dock is not proposed to be constructed or used by, or to otherwise serve, commercial or multifamily residential development. The Dock is configured as a "T," supported by pilings and consisting of a 4-foot-wide by 152-foot-long access walkway, and an approximately 1,983-square-foot terminal platform comprised of a lower-level platform having four vessel slips and a flat platform roof. Two sets of stairs lead from the lower level of the terminal platform to the platform roof, which will be elevated eight feet above the lower-level platform and will have a railed perimeter. The platform roof will function as a roof for the boat storage area below and a sundeck. The four slips on the Dock's lower-level platform will be used for permanent mooring for up to six watercraft: a 23-foot-long ski boat,10/ a 20-foot-long fishing boat, and four jet skis. As proposed, the Dock will occupy a total area of approximately 2,591 square feet. The lower platform of the Dock is proposed to be constructed at an elevation of 121 feet NGVD. The roof/upper platform will be constructed eight feet above that, at an elevation of 129 feet NGVD. The pilings supporting the Dock will be wrapped in an impervious material to prevent leaching of metals and other pollutants into the water. Pursuant to the Specific Purpose Field Survey ("Survey") for the Lease submitted as part of the Application, the Lease will preempt approximately 2,591 square feet, and closely corresponds to the footprint of the Dock. The submerged lands surrounding the Dock that are not occupied by the footprint of the Dock, including the area between terminal platform and the shoreline, are not included in the preempted area of the Lease.11/ The Survey shows "approximate riparian lines" which delineate Howard's riparian area oriented to the center of the waterbody and to the primary navigation channel in the northeast portion of Crooked Lake. As shown on the version of the Survey initially filed as part of the Application, the Dock was proposed to be located approximately 4.7 feet, at its closest point, from the southern riparian line. However, in response to DEP's request for additional information, the Survey was modified in April 2017, to shift the Dock northward within Howard's riparian area. The Dock is now proposed to be located 25.1 feet, at its closest point, from the southern riparian line, and 29.4 feet, at its closest point, from the northern riparian line. The walkway of the Dock will commence at an approximate elevation of 120 feet NGVD, which corresponds to the OHWL established for Crooked Lake. As previously noted above, the walkway will extend waterward approximately 152 feet, where it will intersect with the terminal platform. The terminal platform will extend another 52 feet waterward. In total, the Dock is proposed to extend waterward approximately 204 feet from the OHWL. Although the Dock would be one of the longest and largest docks on Crooked Lake, the credible evidence establishes that there are several other docks of similar size and/or length on the Lake. Rickman testified that he obtained approvals for, or was otherwise aware of, several docks over 2,000 square feet on the Lake. Additionally, the evidence showed that eight other docks on the Lake are longer than the proposed Dock.12/ Rickman testified that most of the larger docks on Crooked Lake have roofs, and that most of these roofs are pitched, rather than flat.13/ As noted above, the water level in Crooked Lake frequently and, at times, extensively fluctuates. As a result, there are periods during which water depths in parts of the Lake are extremely shallow. Rickman testified that the Dock was designed to extend far enough out into Crooked Lake to reach sufficient water depth to enable Howard to maximize the use of the Dock for boating throughout the year. The Dock is designed to extend out to the point at which the bottom elevation of the Lake is approximately 109.9 feet NGVD. Based on the Atlas' ten-year water level graph for Crooked Lake referenced above, Rickman projected that at this point, the water depth typically would be sufficient to allow Howard to operate her largest vessel, the 23-foot ski boat. The ski boat has a 25-inch draft.14/ The boat will be stored out of the water on a boat lift on the Dock, attached by cables to a sub-roof immediately beneath the platform roof. When being lowered into or hoisted from the water, the boat will be placed in a boat cradle consisting of two containment railings approximately 18 inches high each on either side, and a "V" shaped aluminum bottom with bunks on which the boat is cradled. The aluminum bottom of the cradle was estimated to be two to three inches thick. Although the boat cradle is approximately 18 to 21 inches in "total height,"15/ the cradle does not have to be completely lowered its entire 18- to 21-inch height into the water when used. Steven Howard explained, credibly, that the cradle needs to be lowered into the water only a few inches lower than the ski boat's 25-inch draft to enable the boat to float into or out of the cradle. To that point, Rickman testified that taking into account the 25-inch draft of the ski boat and the "total height" of the boat cradle, between 40 and 44 inches of water depth would be required when the cradle is used in order to avoid coming into contact with the Lake bottom. Based on the Atlas graph showing the lowest water levels for the previous ten-year period at approximately 114 feet NGVD, Rickman designed the Dock to extend out to the 109.9-foot NGVD bottom elevation point. At this point, the projected water depth would be slightly more than four feet during periods of the lowest projected water levels for Crooked Lake. For the Dock to be able to wharf out to 109.9 feet NGVD bottom elevation, it must extend a total of approximately 204 feet waterward into the Lake. The credible evidence establishes that while Howard's ski boat is one of the largest, it is not the largest boat operated on Crooked Lake. Impacts Assessment for Environmental Resource Permit Water Quality Impacts As noted above, Crooked Lake is a Class III waterbody. Accordingly, the surface water quality standards and criteria applicable to Class III waters in Florida codified in rule 62-302.300 apply to Crooked Lake. The Dock, as proposed to be constructed and operated, is not anticipated to adversely affect or degrade water quality in Crooked Lake. Specifically, as required by the Consolidated Authorization, a floating turbidity curtain will be installed around the boundary of the construction area before construction commences, and it must be left in place until construction is complete and turbidity levels in the work area have returned to background levels. Additionally, as noted, the pilings supporting the Dock must be wrapped in an impervious material to prevent leaching of metals and other pollutants into the water over the life of the structure. The Consolidated Authorization also prohibits the installation and use of fueling equipment at the Dock; prohibits the discharge of sewage or other waste into the water; prohibits liveaboards; prohibits fish cleaning or the installation of fish cleaning stations unless sufficient measures such as sink screens and waste receptacles are in place; and prohibits repair and maintenance activities involving scraping, sanding, painting, stripping, recoating, and other activities that may degrade water quality or release pollutants into the water. Although the Consolidated Authorization imposes a specific condition requiring, for all vessels using the Dock, a minimum 12-inch clearance between the deepest draft of the vessel (with motor in the down position) and the top of submerged resources, it does not specifically address circumstances where the use of the boat cradle, rather than the vessel itself, may come into contact with the Lake bottom. DEP's witness acknowledged that if the boat cradle were to come into contact with the Lake bottom, water quality standards may be violated. Given the information presented at the final hearing regarding the operation of the boat lift and the need for sufficient clearance between the bottom of the boat cradle and the lake bottom, the undersigned recommends that a specific condition be included in the Consolidated Authorization prohibiting contact of the Lake bottom by the boat cradle. This recommended condition is set forth in paragraph 73.A., below. Upon consideration of the conditions imposed by the Consolidated Authorization discussed above, including imposing a specific condition that prohibits contact of the boat cradle with the Lake bottom, the undersigned finds that the Dock will not adversely affect or degrade the water quality of Crooked Lake. Water Quantity Impacts The Dock, as proposed, is a piling-supported structure that will not impound, store, or impede the flow of surface waters. As such, the Dock will not cause adverse flooding to on-site or offsite property, will not result in adverse impacts to surface water storage and conveyance capabilities, and will not result in adverse impacts to the maintenance of surface or ground water levels. Impacts to Fish, Wildlife, and Listed Species and Habitat The Application states, in section 5, question 6, that there is no vegetation on Howard's riparian shoreline. However, the Survey depicts an area of emergent grasses approximately 60 feet wide and extending diagonally approximately 70 feet waterward into the Lake. The Survey depicts this grassed area as straddling the riparian line between Howard's property and the adjacent parcel to the south. The Survey shows the Dock as being located a significant distance waterward of the grassed area, such that no portion of the Dock will be located on or near this grassed area. Additionally, an aerial photograph of Howard's property and the Lake waterward of Howard's property shows a smaller patch of what appears to be emergent grasses further offshore. This grassed area is not shown on the Survey, and it cannot definitively be determined, by examining the Survey and the aerial photograph, whether this grassed area is growing in an area that will be impacted by the Dock. Steven Howard acknowledged that this smaller grassed area may be located at or near the jet ski slip on the southeastern side of the Dock. An environmental assessment of this smaller grassed area was not performed or submitted as part of the Application. Thus, any value that this area may have as fish and wildlife habitat was not assessed as part of DEP's determination that the Dock will not adversely impact the value of functions provided to fish, wildlife, and to listed species and their habitat. In order to provide reasonable assurance that the Dock will not adversely impact the value of functions provided to fish, wildlife, and to listed species and their habitat, the undersigned recommends including a specific condition in the Consolidated Authorization requiring this smaller grassed area to be completely avoided during construction and operation of the Dock, or, if avoidance is not feasible, that an environmental assessment be performed prior to construction so that the value of this grassed area, if any, to fish, wildlife, and listed species can be evaluated to determine whether minimization and compensatory mitigation should be required. This recommended condition is set forth in paragraph 73.B., below. As previously noted, the Consolidated Authorization contains a specific condition requiring a minimum 12-inch clearance between the deepest draft of the vessel (with the motor in the down position) and the top of submerged resources for all vessels that will use the docking facility. Compliance with this condition will help ensure that the value of functions provided to fish and wildlife and to listed species and their habitat of any such submerged resources is not adversely impacted by vessels using the Dock. The Consolidated Authorization also contains a specific condition requiring handrails to be installed on the Dock to prevent mooring access to portions of the Dock other than the wetslips. This will help protect submerged resources in shallower areas in the vicinity of the Dock. Fish populations in the immediate area of the Dock site may temporarily be affected during construction of the Dock; however, those impacts are not anticipated to be permanent. Additionally, as previously discussed, the Dock pilings must be wrapped with an impervious material to prevent leaching of pollutants into the water, and once installed, the pilings may provide habitat for fish and a substrate for benthic organisms. Provided that the conditions set forth in the draft Consolidated Authorization, as well as the recommendation regarding the smaller grassed area, are included in the final version of the Consolidated Authorization, it is determined that the construction and operation of the Dock will not adversely impact the value of functions provided to fish, wildlife, or to listed species or their habitat.16/ Impact on Navigation Petitioners assert that the Dock will constitute a hazard to navigation in the northeast portion of Crooked Lake. Specifically, they assert that because the Dock will extend out approximately 204 feet into the Lake, it necessarily will create a navigational hazard to boaters in the vicinity. As support, Petitioners presented evidence consisting of Steven Howard's testimony that an inner tube on which his nephew was riding, that was being pulled behind a motor boat, collided with the Gerards' 84-foot-long floating dock adjacent to Howard's riparian area. Petitioners argue that if an 84-foot-long dock creates a navigational hazard, a 204-foot-long dock would create an even greater navigational hazard. The undersigned does not find this argument persuasive. The portion of Crooked Lake on which the Dock is proposed to be located is approximately a mile and a half to two miles long and one-half to three-quarters of a mile wide. Although this portion of Crooked Lake experiences substantial boat traffic, the evidence shows that the Lake is sufficiently large in this area, even with the Dock in place, to allow safe navigation. To this point, it is noted that there are two other longer docks in the northeastern portion of Crooked Lake, extending 220 and 244 feet into the Lake from the shoreline. There was no evidence presented showing that either of these docks constitutes a navigational hazard.17/ Petitioners also assert that during periods of high water in this portion of Crooked Lake, the Dock will be underwater and thus will present a navigational hazard. In support, they presented photographs taken on October 30, 2017—— approximately six weeks after Hurricane Irma struck central Florida——showing ten docks, out of the 109 docks on Crooked Lake, that were partially or completely submerged.18/ When the photographs were taken, the approximate water elevation was 119.2 feet NGVD. All or a portion of the submerged docks had been constructed at or below the 119.2-foot NGVD elevation. The docks without roofs were mostly or completely invisible under the water. However, for the roofed docks, the roofs remained visible above the water even when their docking platforms were submerged. Here, although the walkway and lower platform of Howard's Dock is proposed to be constructed at an elevation of 121 feet NGVD, the roof will be constructed at an elevation of 129 feet NGVD. Thus, even during the relatively infrequent periods19/ during which the water level in Crooked Lake may exceed 121 feet NGVD, the platform roof will still be visible to vessels navigating in this portion of the Lake. Additionally, the Consolidated Authorization contains a specific condition requiring the waterward end of the Dock to be marked with a sufficient number of reflectors to be visible from the water at night by reflected light. This condition provides additional assurance that the Dock will not present a navigational hazard. For these reasons, it is determined that the Dock will not adversely affect navigation. Other ERP-Related Issues The evidence did not show that the Dock is proposed to be located in or proximate to a "work of the District," as defined in section 373.019(28). The only "work of the District" about which evidence was presented is the weir located south of Crooked Lake. This structure is many thousands of feet south of the Dock. There was no evidence presented showing that the Dock would have any impact on this weir. The Dock, as proposed, was designed by an experienced professional contractor who has designed and installed many docks on Crooked Lake, and, as such, is anticipated to function as proposed. The Dock must be built according to engineering diagrams to the Consolidated Authorization, and as-built drawings must be submitted when Dock construction is complete so that DEP can confirm that the Dock is constructed in accordance with the approved design. The evidence establishes that Howard, as the applicant, and Rickman, as the professional contractor in charge of construction, are financially, legally, and administratively capable of ensuring that the activity will be undertaken in accordance with the terms and conditions of the Consolidated Authorization. No evidence to the contrary was presented. The Dock will be located in the waters of Crooked Lake and will be affixed to the submerged bottom. The Department of State, Division of Historical Resources ("DHR"), did not provide any comments indicating that historical or archaeological resources are anticipated to be impacted by the project. Additionally, the Consolidated Authorization contains a general condition requiring subsurface activity associated with construction of the Dock to immediately cease, and DHR to be contacted, if any prehistoric or historic artifacts, such as pottery or ceramics, stone tools or implements, dugout canoes, or other physical remains that could be associated with Native American cultures or early colonial or American settlements are encountered at any time within the project site area. Additional Recommended Conditions Based on the foregoing, the undersigned recommends that the following specific conditions be included in the Consolidated Authorization, Permit No. 53-0351424-001-EI: A minimum six-inch clearance shall be maintained between the top of all submerged resources and the deepest draft of the cradle of the boat lift while in use. For purposes of this condition, submerged resources consist of the bottom sediment and/or any submerged grasses or other aquatic organisms. Any emergent grasses in the permittee's riparian area shall be avoided during the construction and operation of the Dock. If it is not feasible to avoid these grasses, an environmental assessment of the grassed area shall be performed and submitted to the Department prior to commencing construction, so that the value of this grassed area, if any, to fish, wildlife, and listed species can be evaluated and the extent to which minimization and/or compensatory mitigation is appropriate can be determined. Clearly in the Public Interest Florida Administrative Code Rule 62-4.070, Standards for Issuing or Denying Permits, states in pertinent part: A permit shall be issued to the applicant upon such conditions as the Department may direct, only if the applicant affirmatively provides the Department with reasonable assurance based on plans, test results, installation of pollution control equipment, or other information, that the construction, expansion, modification, operation, or activity of the installation will not discharge, emit, or cause pollution in contravention of Department standards or rules. In addition to the foregoing permitting requirements, because the Dock is proposed to be located in an OFW, Howard also must provide reasonable assurance that the Dock meets the "clearly in the public interest" standard. The "clearly in the public interest" standard does not require the applicant to demonstrate need for the project or a net public benefit from the project. Rather, this standard requires the applicant to provide greater assurances, under the circumstances specific to the project, that the project will comply with the applicable permitting requirements.20/ For the reasons discussed above, and with the inclusion of the additional recommended conditions in paragraphs 73.A. and 73.B., it is determined that the proposed Dock meets the applicable permitting requirements and the "clearly in the public interest" standard for issuance of the ERP. Impacts Assessment for Sovereignty Submerged Lands Lease Water-Dependency of the Proposed Dock A water-dependent activity is one which can only be conducted in, on, over, or adjacent to water areas because the activity requires direct access to the water body or sovereignty submerged lands for specified activities, including recreation, and where the use of water or sovereignty submerged lands is an integral part of the activity. See Fla. Admin. Code R. 18-21.003(71). Petitioners argue that the Dock will not constitute a water-dependent activity because the depth of water in the slips may, at times, be insufficient to allow operation of Howard's vessels while complying with the requirement that a minimum 12- inch clearance be maintained between the lowest draft of the vessel and submerged resources. The undersigned finds this argument unpersuasive. The Dock is being constructed specifically for the purpose of enabling Howard to use her vessels for boating——a recreational activity for which use of the water indisputably is an integral part. The Dock's primary purpose is to moor vessels that will be used for the water-dependent recreational activities of boating and fishing, and other water-dependent recreational uses of the Dock include fishing, swimming and sunbathing. Case law interpreting the Florida Administrative Code Chapter 18-21 makes clear that because docks are used for mooring vessels or conducting other in-water recreational uses, they are "water-dependent" activities for purposes of the rules.21/ Thus, even if water depths in the Dock's slips are at times insufficient for vessel mooring or launching,22/ this does not render the Dock not a "water-dependent activity." Resource Management Requirements The preempted area of the Lease is proposed to be used for a Dock that will be used for boating, fishing, and swimming. These traditional in-water recreational uses are consistent with the management purposes of sovereignty submerged lands as described in rule 18-21.004(2)(a). With the inclusion of the conditions currently proposed in the draft Consolidated Approval, as well as the recommended conditions in paragraphs 73.A. and 73.B., the undersigned determines that the Dock will not result in adverse impacts to sovereignty submerged lands and associated resources. With the inclusion of the conditions currently proposed in the draft Consolidated Approval, as well as the recommended conditions in paragraphs 73.A. and 73.B., the undersigned determines that the Dock is designed to minimize or eliminate impacts to fish and wildlife habitat and submerged resources. With the inclusion of the currently proposed conditions in the draft Consolidated Authorization, as well as the recommended conditions set forth in paragraphs 73.A. and 73.B., it is determined that the Dock, as designed and constructed, will minimize or eliminate cutting, removal, or destruction of wetland vegetation. Additionally, as discussed above, the proposed Consolidated Approval requires the avoidance of adverse impacts to historic and cultural resources. Riparian Rights Consistent with rule 18-21.004(3)(d), the Dock is proposed to be constructed in Howard's riparian area and will be set back more than 25 feet from the northerly and southerly riparian lines shown on the Survey. Rule 18-21.004(3)(a) prohibits activities authorized under chapter 18-21 from being implemented in a manner that would unreasonably infringe on traditional common law riparian rights, as defined in section 253.141, of upland owners adjacent to sovereignty submerged lands. Similarly, rule 18-21.004(3)(c) requires all structures and activities to be designed and conducted in a manner that will not unreasonably restrict or infringe upon the riparian rights of adjacent riparian owners. Collectively, these provisions prohibit an activity that will occur on sovereignty submerged lands from unreasonably infringing on or unreasonably restricting the riparian rights of upland riparian owners. Riparian rights are rights appurtenant to, and inseparable from, riparian land that borders on navigable waters. § 253.141, Fla. Stat.; Broward v. Mabry, 50 So. 830 (Fla. 1909). At common law, riparian rights include the rights of navigation, fishing, boating, and commerce. Hayes v. Bowman, 91 So. 2d 795 (Fla. 1957). The right of navigation necessarily includes the right to construct and operate a dock to access navigable waters. Belvedere Dev. Corp. v. Dep't of Transp., 476 So. 2d 649 (Fla. 1985); Shore Vill. Prop. Owners' Ass'n v. Dep't of Envtl. Prot., 824 So. 2d 208, 211 (Fla. 4th DCA 2002). Common law riparian rights also include the right to an obstructed view. Lee Cnty v. Kiesel, 705 So. 2d 1013 (Fla. 2d DCA 1998). Many of these common law riparian rights have been statutorily codified in section 253.141. Statutory riparian rights include the "rights of ingress, egress, boating, bathing, and fishing and such others as may be or have been defined by law." § 253.141(1), Fla. Stat. At issue in this case are the competing riparian rights of next-door neighbors——i.e., Howard's right to wharf out to navigable waters for purposes of boating and other water- dependent recreational activities, and the Gerards' right to an unobstructed view. The question is whether Howard's proposed construction and operation of a dock of sufficient length to enable her to use her boats would unreasonably infringe on or unreasonably restrict the Gerards' right to an unobstructed view of the Lake. By virtue of the riparian rights appurtenant to Howard's riparian property, she is entitled to wharf out to water deep enough to enable her to navigate. She owns two boats, one of which pulls a draft of 25 inches, and the other, a draft of 20 inches, which she uses to navigate the Lake. Thus, an essential aspect of Howard's riparian right of navigation is her ability to construct and operate a dock long enough to enable her to reach water depths sufficient to use these boats. However, as noted above, this right is not unfettered. Howard's exercise of her riparian navigation right cannot unreasonably infringe on Gerard's right to an unobstructed view. Florida case law holds that the right to an "unobstructed" view does not entail a view free of any infringement or restriction whatsoever by neighboring structures or activities. In Hayes, the court defined the right as "a direct, unobstructed view of the [c]hannel and as well a direct, unobstructed means of ingress and egress . . . to the [c]hannel." Id. at 801 (emphasis added). The court then prescribed the rule that "in any given case, the riparian rights of an upland owner must be preserved over an area 'as near as practicable' in the direction of the [c]hannel so as to distribute equitably the submerged lands between the upland and the [c]hannel." Id. (emphasis added). To the extent there is no channel in this portion of the Lake, Hayes dictates that riparian rights must be apportioned equitably, so that a riparian owner's right to an unobstructed view can extend only from the owner's property in the direction of the center of the Lake. Kling v. Dep't of Envtl. Reg., Case No. 77-1224 (Fla. DOAH Oct. 6, 1977; Fla. DER Nov. 18, 1977) at ¶¶ 11-12 (emphasis added). Here, no evidence was presented showing that the Dock——which will be located immediately south and east of the Gerards' riparian property and attendant riparian area——will present an obstruction to the Gerards' view of the Lake channel. Additionally, the evidence did not establish that Howard's Dock would obstruct the Gerards' view of the center of the northeast portion of Crooked Lake, which is located west and slightly south of their property.23/ Administrative precedent in Florida provides additional support for the determination that the Dock will not unreasonably infringe on the Gerards' right to an unobstructed view. In O'Donnell v. Atlantic Dry Dock Corporation, Case No. 04-2240 (Fla. DOAH May 23, 2005; Fla. DEP Sept. 6, 2005), riparian owners challenged the proposed approval of expansions of sovereignty submerged lands leases authorizing Atlantic Dry Dock, a neighboring commercial shipyard, to expand its shipyard facilities and install new docking facilities. The administrative law judge noted that although the expanded shipyard would further encroach on the riparian owners' already somewhat-restricted view from their property, it would not substantially and materially obstruct the Petitioners' view to the channel. He commented: "it [their view] may be further obstructed to the west in the direction of the Atlantic Marine yard, but not in the direction of the channel." To that point, he found that although "any lateral encroachment on the Petitioners' line-of-sight to the channel by the large eastern dry dock proposed will be an annoyance, . . . [it] will not rise to the level of a substantial and material interference or obstruction of the Petitioners' view to the channel." Id. at ¶ 119. He found that "there is no 'special riparian right' to a view of the sunset, just as there was no right to a particular object of view . . . by the riparian owners complaining in the Hayes case." Id. at ¶ 120. Castoro v. Palmer, Case Nos. 96-0736, 96-5879 (Fla. DOAH Sept. 1, 1998; Fla. DEP Oct. 19, 1998), also is instructive. In Castoro, neighboring riparian owners challenged the proposed issuance of an environmental approval and sovereignty submerged lands lease for a 227-foot-long dock having a terminal platform with boat lift. The owners contended that due to the dock's length, it would impermissibly obstruct their views of the water. The administrative law judge rejected that contention, distinguishing the circumstances from those in Lee County v. Kiesel, 705 So. 2d 1013 (Fla. 2d DCA 1998), in which the construction of a bridge that blocked 80 percent of the riparian owners' view of the channel was held to constitute a "substantial and material" obstruction to the riparian right of view. The ALJ noted that although the dock would have "some impact on the neighbors' views" and their use of the waterbody, it did not unreasonably impact their riparian rights to an unobstructed view or to use of the waterbody. Id. at ¶¶ 73-74. In Trump Plaza of the Palm Beaches Condominium v. Palm Beach County, Case No. 08-4752 (Fla. DOAH Sept. 24, 2009; Fla. DEP Oct. 8, 2009), a condominium association challenged the proposed issuance of a sovereignty submerged lands use approval to fill in a dredged area and create mangrove islands in the Lake Worth Lagoon, alleging, among other things, that the creation of the mangrove islands would unreasonably infringe on their riparian right to an unobstructed view. In rejecting this position and recommending issuance of the submerged lands use approval, the ALJ noted that the area obstructed by the mangrove islands would be negligible compared to the remaining expanse of the view, and further noted that the owners' real concern was directed at the aesthetics of the project——specifically, they did not want to view mangrove islands. The ALJ stated: "[t]he evidence supports a finding that while the project will undoubtedly alter the view of the water from [the riparian owners' property], the impact on view is not so significant as to constitute an unreasonable infringement of their riparian rights." Id. at ¶ 86. Applying these case law principles, it is determined that the Dock will not unreasonably infringe on or unreasonably restrict the Gerards' riparian right to an unobstructed view. To that point, the cases make clear that the right to an "unobstructed" view is not an unfettered right to a view of the water completely free of any lateral encroachment, but, instead is the right of a view toward the channel or the center of a lake without unreasonable infringement or restriction. Here, although the Dock will laterally encroach on the Gerards' full panoramic view of the Lake——and, as such, may even constitute an annoyance, the evidence did not show that the Dock will obstruct or otherwise restrict their view to the channel or the center of the Lake. Moreover, to the extent the Gerards have expressed concern about the Dock interfering with their view of the south shore of the Lake, O'Donnell makes clear the desire to have a particular object of view——here, the south shore of the Lake——is not a legally protected riparian right. It is also found that the Dock will not unreasonably interfere with the Gerards' riparian rights of ingress, egress, boating, or navigation. As previously noted, the Dock will be located at least 25 feet inside the riparian lines established for Howard's upland property, and, it will not be constructed in a location or operated in a manner that will obstruct, interfere with, or restrict the Gerards' access to the Lake or to sufficient water depths to enable navigation.24/ The evidence also did not establish that the Dock will restrict or otherwise interfere with the Gerards' use of their riparian area for ingress and egress, boating, fishing, bathing, or other riparian uses. In sum, it is concluded that the Dock will not unreasonably infringe on or restrict the riparian rights of adjacent upland riparian owners. Accordingly, it is determined that the Dock will meet the requirements and standards in rule 18-21.004(3) regarding riparian rights. Navigational Hazard For the reasons discussed in paragraphs 63 through 67, it is determined that the Dock will not constitute a navigational hazard in violation of rule 18-21.004(7)(g). Not Contrary to the Public Interest Rule 18-21.004(1)(a) requires an applicant to demonstrate that an activity proposed to be conducted on sovereignty submerged lands will not be contrary to the public interest. To meet this standard, it is not necessary that the applicant show that the activity is affirmatively in the "public interest," as that term is defined in rule 18-21.003(51). Rather, it is sufficient that the applicant show that there are few, if any, "demonstrable environmental, social, and economic costs" of the proposed activity. Castoro, at ¶ 69. For the reasons discussed above, and with the inclusion of the additional recommended conditions in paragraphs 73.A. and 73.B., it is determined that the proposed Dock meets the "not contrary to the public interest" standard required for issuance of the Lease. Demonstration of Entitlement to ERP Howard met her burden under section 120.569(2)(p) to present a prima facie case of entitlement to the ERP by entering into evidence the Application, the Notice of Intent, and supporting information regarding the proposed Dock. She also presented credible, competent, and substantial evidence beyond that required to meet her burden under section 120.569(2)(p) to demonstrate prima facie entitlement to the ERP. The burden then shifted to Petitioners to demonstrate, by a preponderance of the competent substantial evidence, that the Dock does not comply with section 373.414 and applicable ERP rules. For the reasons discussed above, it is determined that Petitioners did not meet their burden of persuasion under section 120.569(2)(p) in this proceeding. Accordingly, for the reasons addressed above, it is determined that Howard is entitled to issuance of the ERP for the Dock. Demonstration of Entitlement to Lease As previously discussed, Howard bore the burden of proof in this proceeding to demonstrate, by a preponderance of the evidence, that the Dock meets all applicable statutory and rule requirements for issuance of the Lease for the Dock. For the reasons discussed above, it is determined that Howard met this burden, and, therefore, is entitled to issuance of the sovereignty submerged lands lease for the Dock. Petitioners' Standing Defenders' Standing As stipulated by the parties and noted above, Defenders is an incorporated non-profit entity created for the primary purpose of protecting and preserving Crooked Lake so that it may remain an OFW for all members of the public to enjoy. Defenders has been in existence since at least the mid- 1980s. Robert Luther, the president of Defenders, testified that the organization's purpose also entails providing education and promoting public awareness in order to preserve the natural beauty, water quality, ecological value, and quality of life around Crooked Lake. As stipulated by the parties and noted above, Defenders has more than 25 members. Luther testified that Defenders has approximately 100 family members, most of whom live on or around Crooked Lake. He noted that many of Defenders' members own boats, which they park at a local boat landing on the Lake. Based on this testimony, it is inferred that these members operate their boats on Crooked Lake. After receiving the public notice of the project, Defenders' board of directors voted to oppose issuance of the Consolidated Authorization for the Dock. Luther testified that the board's decision was based on the determination that "it was clearly within the public interest" to oppose the Dock. Gerards' Standing The Gerards reside at 1055 Scenic Highway, Babson Park, Florida. Their riparian property is immediately adjacent to, and northwest of, Howard's property. The Gerards own a floating dock that is located within their riparian area.25/ The dock consists of two 4-foot- wide by 30-foot-long ramps attached to a 24-foot-long by 8-foot- wide pontoon boat. Priscilla Gerard testified that she enjoys spending time sitting and reading books on the beach in front of her property, and that having that area to sit and read is a significant aspect of her enjoyment of her lakefront property. Ms. Gerard observed that extensive boating activities in the northeast portion of the Lake on weekends is disruptive, and interferes with her use of her beach for relaxing and reading. She particularly noted that boats operating very close to the shore cause waves to splash up on her beach, interfering with her ability to sit and read close to the shore. She did not contend that Howard's use of the Dock for boating would contribute to the disruptive nature of existing boat traffic in the vicinity. Ms. Gerard has viewed the plans for the proposed Dock and is very concerned that due to its size, her view of the south side of the Lake will be completely blocked. She acknowledged, and other competent, credible evidence showed, that there are other docks on the Lake in the vicinity of her riparian property. The evidence shows that existing docks having lengths of 145 feet and 170 feet are located in the vicinity of, and are visible from, the Gerards' property. She testified that an existing dock and tiki hut block her view of the Lake to the north. She acknowledged that although Howard's Dock, if constructed as proposed, may somewhat obstruct her view to the left (south) of her property, it would not block her view straight out into the Lake. Phillip Gerard testified that he has boated extensively on Crooked Lake in a variety of vessel types. He further testified that he has observed a range of boating practices on Crooked Lake, including seeing water skiers and persons being towed behind motorized vessels on inner tubes and other types of "towables." He testified that, based on his personal observations, persons being towed do not have independent control of the speed or direction of the "towable"; thus, depending on the direction in which the towing vessel turns, the towable may be slung to the left or the right. Gerard commented that such lack of control could result in a person riding on a towable colliding with a dock, and he noted that Howard's nephew, who was riding on an inner tube being towed by a boat, was involved in such a collection with his (Mr. Gerard's) own dock. Mr. Gerard did not testify that the Dock would present a navigational hazard to, or otherwise interfere with, the Gerards' riparian right of ingress and egress. Neither of the Gerards testified that the Dock would impact their ability to access navigable waters in the Lake. Mr. Gerard acknowledged that if Howard's Dock were constructed, boats that currently travel very close to the shoreline of his property would be forced to swing further out in the Lake, away from his riparian shoreline, in order to avoid the Dock.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order approving the issuance of Consolidated Environmental Resource Permit and Recommended Intent to Grant Sovereignty Submerged Lands Authorization, Permit No. 53-0351424-001-EI, on the terms and conditions set forth in the Consolidated Notice of Intent and attached draft of Permit No. 53-0351424-001-EI, as modified to include the Additional Recommended Conditions set forth in paragraphs 73.A. and 73B. DONE AND ENTERED this 5th day of July, 2018, in Tallahassee, Leon County, Florida. S CATHY M. SELLERS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 5th day of July, 2018.
Findings Of Fact Based upon the oral and documentary evidence adduced at the final hearing and the entire record in this proceeding, the following findings of fact are made: The SFWMD is a public corporation in the state of Florida existing by virtue of Chapter 25270, Laws of Florida, 1949, and operating pursuant to Chapter 573, Fla. Stat., and Title 40E, Fla. Admin. Code, as a multi-purpose water management district, with its principal office in West Palm Beach, Florida. The Navy has proposed construction of a naval housing facility on the Peary Court site (the "Site") in Key West, Florida. The Site is approximately 25.89 acres and will provide 160 housing units for junior enlisted Navy and Air Force personnel and their families. The Site is the center of a larger, 37 acre drainage basin. The Site was formerly the location of military housing. However, for the past 18 years, the Site had been used by the City of Key West, with the assent of the Navy, for active and passive recreation for city residents. The Site contains a cemetery of historic value and a former military housing structure now being used by the Navy Key West Federal Credit Union with an associated parking area of paved asphalt. On February 6, 1992, the Navy submitted an application for a Surface Water Management District General Permit for the Project. The proposed surface water management system (the "System") was designed by Rice Creekmore, a registered professional engineer, and his company Johnson, Creekmore, and Fabray. The proposed System utilizes the existing topography and incorporates a number of drainage control mechanisms to manage the run-off from the Site. The System employs inlets, swales and culverts to direct stormwater run-off into dry detention areas (ponds) for pretreatment prior to discharging into seven 24-inch Class V injection wells (drainage wells). As discussed below, these injection wells must be permitted by the Florida Department of Environmental Regulation ("FDER"). The dry pond areas utilize key ditches, bottom elevation 1.0' NGVD, in order to hydraulically connect all of the dry pond areas together into one dry system prior to overflowing into the drainage wells beginning at elevation 1.5' NGVD. In other words, the detention ponds are interconnected with pipes. The design includes only one point where run-off would be discharged from the Site during any storm equal to a 25 year, three day storm event. That discharge would occur at the lowest point of the Site at the corner of Eisenhower and Palm. The water would be discharged through a V notch weir (the "Weir") into the City's stormwater system. An existing 12" storm drain line at the discharge point will be replaced by a 13.5" by 22.0" Reinforced Concrete Elliptical Pipe culvert. As discussed in more detail below, the System is designed so as to detain 1" of run-off within the dry detention ponds prior to any discharge through the Weir. After review of the application and submittals, the SFWMD issued a Notice of Intent to issue General Permit and Stormwater Discharge Certification No. 44-00178-S (the "Permit") on September 29, 1992. Petitioner and Intervenor timely petitioned for an administrative hearing challenging the SFWMD decision to award the Permit. There is no dispute as to the standing of either Petitioner or Intervenor. The SFWMD has adopted rules that set forth the criteria which an applicant must satisfy in order for a surface water management permit to issue. The criteria are set forth in Rule 40E-4, Florida Administrative Code. Rule 40E-4.301(1)(m) and 40E-4.091(1)(a) incorporate by reference The Basis of Review for Surface Water Management Permit Applications within South Florida Water Management District - April, 1987, ("The Basis for Review"). The Basis for Review explicates certain procedures and information used by the SFWMD staff in reviewing a surface water management permit application. The SFWMD issues general permits for projects of 40 acres or less that meet specific criteria. All other projects must obtain individual permits which are reviewed by the District Board. The specific rules relating only to general permits are set forth in Rule 40E-40. In addition, the Basis for Review sets forth certain technical requirements which must be met for the issuance of a general permit including general construction requirements and special requirements for wetlands. The Basis for Review also sets forth criteria for how a proposed system should address water quantity and water quality issues. The SFWMD assumes that water quantity and water quality standards will be met if a system satisfies the criteria set forth in the Basis for Review. Water Quantity Criteria Rule 40E-4.301(a), Florida Administrative Code, requires an applicant to provide reasonable assurances that a surface water management system will provide adequate flood protection and drainage. The purpose of the water quantity criteria is to insure that pre- development flows and post-development flows are equal. The SFWMD requires calculations of a project's projected post-development flow to guarantee that the post-development discharge rate will not be in excess of the pre-development discharge rate. These calculations are based on a 25 year, 3 day storm event. There is no stormwater management system in place at the Project Site. The pre-development topography results in a pre-development discharge point from the Site at the corner of Eisenhower Drive and Palm Avenue. At this point, a discharge or outfall pipe leads into the City of Key West's stormwater management system. The City's system ultimately discharge into Garrison Bight, a nearly waterbody which is discussed in more detail below. At the time the Navy began planning for the Project, the Navy was told that the discharge pipe had a capacity of accepting water at a rate of 40 cubic feet per second ("CFS"). The Navy initially designed a system to utilize this capacity. Subsequently, it was discovered that, due to the size of the pipe at the discharge point and the capacity of the pipes downstream in the City of Key West's stormwater management system, the City would not allow or accommodate a discharge of more than 11 CFS from the Site. Thus, the System had to be redesigned so that the discharge to the City's system would not exceed 11 CFS. The system was redesigned to incorporate the seven (7) Class V injection wells. The injection wells are intended to insure that discharge from the Project into the City stormwater system through the surface water discharge pipe at Eisenhower Drive and Palm Avenue will not exceed 11 CFS. The injection wells introduce treated stormwater into the ground before it reaches the discharge point. The pre-development rate of surface water discharge from Peary Court in a 25 year, 72 hour storm event was 55 CFS. This rate was calculated based upon a site survey, a determination of the existing amount of pervious versus impervious surface area, and a calculation made through a generally accepted civil-engineering computer program. 1/ This predevelopment discharge is the amount of water which would be expected to discharge off-site after percolation occurs. The number and size of the injection wells for the proposed system were determined based upon tests of an on-site twelve-inch fire well. The results of the tests revealed that the on-site test well could manage in excess of 2 CFS. Due to test limitations, the exact capacity could not be measured, but the capacity was clearly more than 2 CFS. These results were then compared with data obtained from the engineering firm of Post, Buckeley, Schuh & Jernigan for installed wells in the Florida Keys of a similar nature and size to the wells in the proposed surface water management system. The Post, Buckeley test results indicated that 24-inch wells had a capacity of 31 CFS. In addition, the design engineer consulted with South Florida Well Drillers, who have drilled other wells in the Florida Keys including 24-inch wells at the Key West airport which were completed shortly before the application for this Project. South Florida Well drillers found the capacity of 24-inch wells in Key West to be in the 25 to 30 CFS range. Based upon the results of the test well and the related reports described above, the project engineer based his design of the surface water management system on an estimated well capacity of 8.4 CFS for each well. These estimates were submitted by the Navy in its application and were appropriately determined to be reasonable by the SFWMD staff. Indeed, the evidence established that 8.4 CFS was a conservative estimate. The seven injection wells, at an estimated capacity of approximately 8.4 CFS each, provide in excess of 56 CFS of well discharge capacity, which is beyond the necessary discharge volume for the Project. Limiting Condition No. 13 of the Permit requires the Navy to obtain a well capacity test from a Florida Registered Professional Engineer or Professional Geologist following the installation of the first Class V injection well at the Site. If the results of this test indicate that the capacity of the well is different than that submitted by the Navy in its application, the Navy must apply for a permit modification to provide a design which incorporates a representative injection well flow-rate and an appropriate number of wells for the Site. In view of the reasonableness of the capacity rates utilized for the wells, it is unlikely that the results of the capacity test will result in any major design change in the proposed surface water management system. The use of the injection wells in the proposed surface water management system will significantly reduce the amount of run-off which would otherwise reach Garrison Bight from the Site. After the System is completed, it is expected that the amount of run-off from the Site that will reach Garrison Bight will be only 20 percent of the predevelopment amount. In addition, because there has previously been no management of the run-off from the Site and surrounding areas, there has been a frequent flooding problem at the corner of Eisenhower Drive and Palm Avenue after heavy rain storms. The proposed surface water management system will accommodate the overflow of water which historically occurred when discharges from Peary Court and the surrounding areas could not be accommodated by the Key West storm water management system. Petitioner and Intervenor suggest that the effect of tidal flow on the capacity of the wells was not fully considered. The evidence established that the design engineer considered normal high tides in calculating groundwater elevations. Respondent's engineering experts have concluded that the proposed surface water management system is effectively designed to accommodate the Florida Keys' tidal flows. Petitioner and Intervenor offered no expert testimony to refute this conclusion and/or to establish that the tides would impact the effectiveness of the proposed surface water management system. In the event that an extremely high tide occurs at the time of a storm, the detention ponds may hold standing water for a short time. This water would not be discharged off-site. There is no evidence that tidal influences would in any way adversely affect the System's ability to uptake pollutants in the "first- flush". The Class V shallow injection wells are an integral part of the proposed Peary Court surface water management system. Without the injection wells it is not clear whether the Project could meet the SFWMD water quantity criteria. The SFWMD does not have authority to permit Class V injection wells. FDER must permit those wells. The Peary Court site is not the first Florida Keys' project permitted by the SFWMD which utilizes injection wells. The surface water management permits for the other projects were issued contingent upon obtaining the necessary permits for the injection wells. Special Condition No. 14 of the Permit provides that the Permit is conditioned on the Applicant obtaining the applicable permits from FDER for the injection wells. During the interim while the Navy is seeking the FDER permits, it should be required to retain all run-off on-site. If the Navy is not able to obtain the necessary FDER permits for the injection wells, the Navy should be required to either retain all run-off on-site or propose an alternate design to meet the SFWMD's water quantity requirements. A modified permit application with a new Notice of Intent should be required for any alternate design. The following Special Condition Number 14 was offered by the SFWMD at the hearing (language revised from original condition is highlighted and underlined): THIS PERMIT IS ISSUED BASED ON THE APPLICANT OBTAINING THE NECESSARY CLASS V INJECTION WELL PERMITS FROM THE FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION (FDER). THE PERMITTEE SHALL SUBMIT AN APPROVED CLASS V DRAINAGE WELL PERMIT FROM FDER PRIOR TO OPERATION OF THE SURFACE WATER MANAGEMENT SYSTEM. IN THE INTERIM, THE PERMITTEE SHALL CERTIFY TO THE DISTRICT THAT NO OFF-SITE DISCHARGE WILL OCCUR UNTIL THE APPROVED CLASS V DRAINAGE WELLS ARE IN OPERATION. IF THE SURFACE WATER MANAGEMENT SYSTEM DESIGN MUST BE MODIFIED AS A RESULT OF FDER REQUIREMENTS OR IF THE CLASS V INJECTION WELL PERMITS ARE NOT ISSUED, THE APPLICANT SHALL APPLY FOR A PERMIT MODIFICATION TO PROVIDE A SURFACE WATER MANAGEMENT SYSTEM DESIGN WHICH SHALL MEET DISTRICT CRITERIA IN EFFECT AT THAT TIME. The proposed additional language requires the Navy to certify that no off-site discharges will occur until the injection wells are permitted and are operating. This revised language should be added to Special Condition No. 14 to clarify that the injection wells must be in operation prior to any off-site discharge from the surface water management system. Maintenance of the surface water management system entails upkeep of the dry detention areas and routine grass cutting, as well as inspection of the injection wells on a periodic basis to guard against clogging and reduced capacity. The system is essentially designed to operate without direct surveillance or intervention. Injection wells do not require any additional maintenance over and above that which is routinely required for other types of surface water management systems. The injection wells will require routine maintenance to ensure that manholes and inlets do not become clogged. Limiting Condition No. 8 of the Permit requires that the surface water management system, including the injection wells, be maintained. At the hearing, the SFWMD proposed that a condition be added to the Permit to further clarify the maintenance requirements. A condition requiring long-term maintenance would be desirable and reasonable. A new special condition should be added to the Permit requiring long-term maintenance of grass swales and inspections of injection wells for clogging. Acceptable language for such a condition would be: SPECIAL CONDITION NO. 15 The permittee shall provide long-term maintenance of the surface water management system, encompassing the injection wells, including, but not limited to, (a) maintenance of the vegetation in the grass swales and detention ponds and (b) routine inspections of wells and discharge structures for clogging. Water Quality Criteria As noted above, there is no designed system for surface water management and/or water quality pretreatment at the Site in its undeveloped state. Surface water run-off that can not be managed by the City of Key West's storm water management system collects in roads adjacent to the Site, resulting in adverse water quality and quantity impacts to adjacent land and receiving waters. The applicable water quality criteria, contained in Rule 40E-4.301, Florida Administrative Code, require an applicant to provide reasonable assurances that a surface water management system will not cause adverse water quality impacts to receiving waters and adjacent lands, and will not cause discharge which results in any violation of the standards and criteria of Chapter 17-302 for surface waters of the state. Rule 40E-4.301 provides that: In order to obtain a permit under this chapter, an applicant must give reasonable assurances that the surface water management system is consistent with the State Water Policy as set forth in Chapter 17-40, Florida Administrative Code (40E-4.301(1)(h), Florida Administrative Code. Rule 17-40.420 provides in pertinent part: Minimum Stormwater Treatment Performance Standards. When a stormwater management system complies with rules establishing the design and performance criteria for stormwater management systems, there shall be a rebuttable presumption that such systems will comply with state water quality standards. The Department and the Districts, pursuant to Section 373.436, Florida Statutes, shall adopt rules that specify design and performance criteria for new stormwater management systems which: 1. Shall be designed to achieve at least 80 percent reduction of the average annual load of pollutants that would cause or contribute to violations of state water quality standards. The Basis for Review, which is incorporated into Title 40E, Florida Administrative Code, by reference, further delineates the applicable water quality permit criteria for surface water management systems. Regarding water quality criteria, the Basis for Review provides: 3.2.2.1 State standards - Projects shall be designed so that discharges will meet state water quality standards, as set forth in Chapter 17-3 [revised to 17-302], Florida Administrative Code. The SFWMD's water quality criteria do not require chemical testing of stormwater for residential projects. The SFWMD's water quality criteria require that the design of a surface water management system meet applicable design/technology based criteria. Section 3.2.2.2 of the Basis for Review contains the specific water quality criteria for the design of a surface water management system. The SFWMD allows applicants to design their surface water management system using either dry or wet detention or dry or wet retention, so long as the treatment provided by the system meets water quality and quantity criteria. Dry detention consists of a system of grass swales and vegetative- covered ponds which detain water at a predetermined rate prior to off-site discharge. Wet retention can contain canals, ditches, lakes or ponds to retain water on-site. If a system is designed to meet the criteria specified in 3.2.2.2(a) of the Basis for Review and incorporates Best Management Practices ("BMP's") for the type of system proposed, the SFWMD presumes that water quality standards will not be violated. In determining which system is appropriate for a particular site, water quantity (flooding impacts) and water quality impacts must be balanced. In some cases, water quantity concerns may preclude certain types of water quality treatment methods. At the hearing in this case, Petitioner and Intervenor suggested that retention is superior to detention in designing surface water management systems. The evidence presented in this case was insufficient to support this conclusion. In any event, this contention focuses only on water quality considerations. One drawback to retention is that it may have on-site flooding impacts. With respect to this Project, the evidence indicates that retention may not have been an acceptable alternative because of possible adverse water quantity impacts. The Navy's proposed surface water management system was designed to utilize dry detention with filtration for treatment of surface water prior to discharge into the injection wells and/or off-site. The design uses a system of grass swales and grass-covered detention ponds to detain and filter pollutants from the surface water as it makes its way through the dry detention system. The System is designed to utilize as many grass swale areas as possible to filter or treat the surface water before it reaches the detention ponds which provide further treatment. The swales restrict the flow of water to approxmiately one half to one foot per second which allows for percolation and a tremendous amount of filtration. The System utilizes the natural topography of the Site to direct water through the dry detention system to the lowest point of the Site at the corner of Eisenhower Drive and Palm Avenue. Any water which makes it to this last detention pond and is not drained into one of the injection wells can flow through the discharge structure (the Weir) at 11 CFS and ultimately make it into Garrison Bight. Petitioner and Intervenor have suggested that the design of the proposed System is defective because water discharged from the cul-de-sacs in the Project design will flow directly into detention ponds without passing over any of the grass swales. The permit criteria do not specify that all surface water must contact grass swales prior to reaching a detention pond. While greater filtration is achieved the longer the run-off remains in the system, the evidence established that the detention ponds by themselves provide sufficient water quality treatment. With respect to all but one of the cul-de-sacs, the water must pass through at least two detention ponds before it is discharged. Run-off from the cul-de-sac closest to the Weir will receive treatment only in the last discharge pond. Petitioner and Intervenor questioned whether the run- off from this last cul-de-sac will receive adequate treatment, in other words, whether the "first flush" will be adequately detained prior to discharge, especially in circumstances when the detention pond is already wet. However, the evidence was insufficient to establish that their concerns are justified and/or that this situation would constitute a violation of water quality standards. This cul-de-sac is only 100 ft in diameter and accounts for no more than 8 percent of the total run-off from the Site. After considering all of the evidence, it is concluded that the water from the cul-de-sacs will be adequately treated in accordance with the permit criteria prior to any discharge. In assessing the Navy's proposed surface water management system the following criteria from the Basis for Review are pertinent in determining whether the proposed System will provide appropriate water quality treatment: 3.2.2.2 Retention and/or detention in the overall system, including swales, lakes, canals, greenways, etc., shall be provided for one of the three following criteria or equivalent combinations thereof. . .: Wet detention volume shall be provided for the first inch of run-off from the developed project, or the total run-off of 2.5 inches times the percentage of imperviousness, whichever is greater. Dry detention volume shall be provided equal to 75 percent of the above amounts computed for wet detention. If the receiving waterbody, is a "sensitive receiving water," which would include an Outstanding Florida Water, the following additional criteria regarding direct discharges are applicable: 3.2.2.2 d. Projects having greater than 40 percent impervious area and which discharge directly to sensitive receiving waters shall provide at least one half inch of dry detention or retention pretreatment as part of the required retention/detention. The SFWMD interprets the permitting criteria as creating a rebuttable presumption that a surface water management system that provides detention in accordance with BMP's of the first inch (1") of run-off from a Site, commonly referred to as the "first-flush", will meet state water quality standards. The "first-flush" occurs at the onset of a rainfall when most pollutants run off paved areas and percolate into the grass swales. It is an accepted design parameter that the "first flush" contains 90 percent of the pollutants which will be collected in the run-off. The 90 percent of the pollutants in the first flush are consequently retained on-site through pure percolation and never reach the discharge facility. Although Petitioner and Intervenor suggest that dry detention does not provide this degree of filtration, the evidence was insufficient to support this contention. The proposed System for this Project provides treatment for the first one inch (1") of run-off from the developed Project, thereby meeting the permitting criteria for sensitive receiving waters. Intervenor and Petitioner contend that the development of this Project will necessarily result in a larger amount of pollutants in the run-off from the Site. They argue that the Applicant has not provided reasonable assurances that capturing 90 percent of the increased level of pollutants in the first flush will meet water quality standards. As noted above, compliance with the permit criteria creates a rebuttable presumption that water quality standards will be met. Insufficient evidence was presented to overcome this rebuttable presumption. In calculating the appropriate volume for the dry detention ponds, the Project engineer used the Site's percentage of impervious area. The percentage of impervious area was determined in accordance with SFWMD criteria. The calculations do not account for any percolation from the impervious areas even though much of that run-off will pass through swales and other grassy areas of the Site. In addition, there is a built-in buffer between the berm elevation around the ponds and the expected water level in the ponds. These factors confirm that there is significant additional capacity in the ponds which is an overage or safety net. In sizing the detention ponds, the project engineer also factored in additional off-site water that will be coming on-site from Palm Avenue. This water currently ponds on Palm Avenue contributing to a recurring flooding problem in the area. This off-site water will be routed through an inlet and pumped directly into on-site detention areas thereby reducing flooding on Palm Avenue and providing some treatment for off-site run-off that was not previously treated before entering the City's stormwater system. As noted above, additional water quality criteria requirements apply to projects which discharge to an Outstanding Florida Water. These additional criteria are set forth in paragraph 40 above. Outstanding Florida Water or OFW is the designation given exclusively by the FDER to certain waterbodies in Florida which have special significance, either for ecological or recreational reasons. Outstanding Florida Waters are afforded the highest degree of water quality protection. The criteria for designation of waters as Outstanding Florida Waters is found in Chapter 17-302, Florida Administrative Code. When the SFWMD initially reviewed the Permit application for this Project, it erroneously assumed that Garrison Bight, the ultimate receiving body for the waters discharged from the project through the City stormwater system, was an OFW. Although the SFWMD applied water quality criteria for OFW's when it reviewed the subject permit application, the evidence at the hearing in this case established that Garrison Bight is not an Outstanding Florida Water. A FDER representative, qualified as an expert in the designation of Outstanding Florida Waters, testified that the Outstanding Florida Water designation does not apply to certain waterbodies that were degraded at the time of designation or did not have the significance or pristine water quality that merit special protection. The designation also does not apply to artificial waterbodies. Artificial waterbodies are defined in Rule 17-302.700(9)(i), Florida Administrative Code, as a waterbody created by dredging or excavation or by the filing in of its boundaries on at least two sides. The FDER has formally determined that Garrison Bight is not an Outstanding Florida Water because Garrison Bight is an artificial waterbody in accordance with the definition. Furthermore, Garrison Bight is the site of extensive boating and marina activities. The water quality of Garrison Bight is currently degraded in comparison to ambient conditions and offshore/unconfined water. In sum, the evidence established that proposed surface water management system meets or exceeds the current permit criteria. Consequently, the water flowing into Garrison Bight from the Site will be significantly less and much cleaner after the proposed surface water management system is installed than it currently is without a designed surface water management system.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered approving the issuance of Surface Water Management General Permit No. 44-01785 in accordance with the Notice of Intent dated September 29, 1992 and the additional conditions noted in this Recommended Order. DONE AND ENTERED this 14th day of May, 1993, at Tallahassee, Florida. J. STEPHEN MENTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of May, 1993.
The Issue The issue in this matter is whether Respondent, Polk County Board of Commissioners (Polk County or County) has provided Respondent, Southwest Florida Water Management District (SWFWMD), with reasonable assurances that the activities Polk County proposed to conduct pursuant to Standard General Environmental Resource Permit (ERP) No. 4419803.000 (the Permit) meet the conditions for issuance of permits established in Rules 40D-4.301, and 40D-40.302, Florida Administrative Code. (All rule citations are to the current Florida Administrative Code.)
Findings Of Fact Events Preceding Submittal of ERP Application The Eagle-Millsite-Hancock drainage system dates back to at least the 1920's, and has been altered and modified over time, especially as a result of phosphate mining activities which occurred on OFP property in the 1950's-1960's. The system is on private property and is not owned and was not constructed by the County. Prior to 1996, the Eagle-Millsite-Hancock drainage system was in extremely poor repair and not well- maintained. The Eagle-Millsite-Hancock drainage system originates at Eagle Lake, which is an approximately 641-acre natural lake, and discharges through a ditch drainage system to Lake Millsite, which is an approximately 130-acre natural lake. Lake Millsite drains through a series of ditches, wetlands, and ponds and flows through OFP property through a series of reclaimed phosphate pits, ditches and wetlands and ultimately flows into Lake Hancock, which is an approximately 4500-acre lake that forms part of the headwaters for the Peace River. The drainage route is approximately 0.5 to 1 mile in overall length. The Eagle-Millsite-Hancock drainage system is one of eight regional systems in the County for which the County and SWFWMD have agreed to share certain funding responsibilities pursuant to a 1996 letter agreement. To implement improvements to these drainage systems, Polk County would be required to comply with all permitting requirements of SWFWMD. During the winter of 1997-1998, Polk County experienced extremely heavy rainfall, over 39 inches, as a result of El Nino weather conditions. This unprecedented rainfall was preceded by high rainfalls during the 1995-1996 rainy season which saturated surface waters and groundwater levels. During 1998, Polk County declared a state of emergency and was declared a federal disaster area qualifying for FEMA assistance. Along the Lake Eagle and Millsite Lake drainage areas, septic tanks were malfunctioning, wells were inundated and roads were underwater. The County received many flooding complaints from citizens in the area. As a result of flooding conditions, emergency measures were taken by the County. The County obtained SWFWMD authorization to undertake ditch cleaning or vegetative control for several drainage ditch systems in the County, including the Eagle-Millsite-Hancock drainage system. No SWFWMD ERP permit was required or obtained for this ditch cleaning and vegetative control. During its efforts to alleviate flooding and undertake emergency ditch maintenance along the Eagle-Millsite-Hancock drainage route, the County discovered a driveway culvert near Spirit Lake Road which was crushed and impeding flow. The evidence was unclear and contradictory as to the size of the culvert. Petitioner's evidence suggested that it consisted of a 24-inch pipe while evidence presented by the County and by SWFWMD suggested that it was a 56-inch by 36-inch arched pipe culvert. It is found that the latter evidence was more persuasive. On February 25, 1998, the County removed the crushed arched pipe culvert at Spirit Lake Road and replaced it with two 48-inch diameter pipes to allow water to flow through the system. The replacement of this structure did not constitute ditch maintenance, and it required a SWFWMD ERP. However, no ERP was obtained at that time (although SWFWMD was notified prior to the activity). (One of the eight specific construction items to be authorized under the subject ERP is the replacement of this culvert.) Old Florida Plantation, Ltd. (OFP) property also experienced flooding during February 1998. OFP's property is situated along the eastern shore of Lake Hancock, and the Eagle- Millsite-Hancock drainage system historically has flowed across the property before entering Lake Hancock. In the 1950's and 1960's, the property was mined for phosphate. The mining process destroyed the natural vegetation and drastically altered the soils and topography, resulting in the formation of areas of unnaturally high elevations and unnaturally deep pits that filled with water. OFP purchased the property from U.S. Steel in 1991. The next year OFP initiated reclamation of the property, which proceeded through approximately 1998. In 1996, OFP applied to the County for approval of a development of regional impact (DRI). OFP blamed the flooding on its property in 1998 on the County's activities upstream, claiming that the property had never flooded before. But upon investigation, the County discovered a 48-inch diameter pipe on OFP property which, while part of OFP's permitted drainage system, had been blocked (actually, never unopened) due to OFP's concerns that opening the pipe would wash away wetlands plants recently planted as part of OFP's wetland restoration efforts. With OFP and SWFWMD approval, the County opened this pipe in a controlled manner to allow flowage without damaging the new wetlands plants. Following the opening of this blocked pipe, OFP property upstream experienced a gradual drop in flood water levels. When the water level on OFP's property stabilized, it was five feet lower and no longer flooded. Nonetheless, OFP continues to maintain not only that the County's activities upstream caused flooding on OFP property but also that they changed historic flow conditions. This contention is rejected as not being supported by the evidence. Not only did flooding cease after the 48-inch pipe on OFP's property was opened, subsequent modeling of water flows also demonstrated that the County's replacement of the crushed box culvert at the driveway on Spirit Lake Road as described in Finding 8, supra, did not increase flood stages by the time the water flows into the OFP site and did not cause flooding on OFP property in 1998. (To the contrary, OFP actions to block flows onto its property may have contributed to flooding upstream.) On October 6, 1998, the County entered into a contract with BCI Engineers and Scientists to initiate a study on the Eagle-Millsite-Hancock drainage system, identify options for alleviating flooding along the system and prepare an application for an ERP to authorize needed improvements to the system. Prior to the County's submittal of an ERP application, SWFWMD issued a conceptual ERP to OFP for its proposed wet detention surface water management system to support its proposed DRI on the OFP property. OFP's conceptual permit incorporated the Eagle-Millsite-Hancock drainage system and accommodated off-site flowage into the system. Before submitting an ERP application to SWFWMD, the County had communications with representatives of OFP concerning an easement for the flow of the drainage system through OFP property. In March 1999, the County reached an understanding with OFP's engineering consultant whereby OFP would provide the County with an easement across OFP lands to allow water to flow through to Lake Hancock. In turn, the County would: construct and pay for a control structure and pipe east of OFP to provide adequate flowage without adversely affecting either upstream or downstream surface waters; construct and upgrade any pipes and structures needed to convey water across OFP property to Lake Hancock; and provide all modeling data for OFP's review. The ERP Application Following completion of the engineering study, the County submitted ERP Application No. 4419803.000 for a Standard General ERP to construct improvements to the Eagle-Millsite- Hancock drainage system on August 18, 1999. Eight specific construction activities are proposed under the County's project, at various points along the Eagle- Millsite-Hancock drainage system as follows: 1) Add riprap along channel bottom; 2) Modify culvert by replacing 56-inch by 36- inch arch pipe by two 48-inch pipes (after-the-fact, done in 1998, as described in Finding 8, supra); 3) Add riprap along channel bottom; 4) Add box, modify culvert by replacing existing pipe with two 48-inch pipes, add riprap along channel bottom; 5) add riprap along channel bottom; 6) Add weir, modify culvert by replacing existing 24-inch pipe with two 48-inch pipes, add riprap along channel bottom; 7) Add box and modify culvert by replacing existing 24-inch pipe with two 48-inch pipes; 8) Modify existing weir. Under the County's application, construction activities Nos. 6, 7, and 8 would occur on OFP property. In addition, it was proposed that surface water would flow across OFP's property (generally, following existing on-site drainage patterns), and it was indicated that flood elevations would rise in some locations on OFP's property as a result of the improvements proposed in the County's application. (Most if not all of the rise in water level would be contained within the relatively steep banks of the lakes on OFP's property--the reclaimed phosphate mine pits.) In its application, the County stated that it was in the process of obtaining easements for project area. As part of the ERP application review process, SWFWMD staff requested, by letter dated September 17, 1999, that the County clarify the location of the necessary rights-of-way and drainage easements for the drainage improvements and provide authorization from OFP as property owner accepting the peak stage increases anticipated in certain OFP lakes as a result of the County's proposed project activities. On September 28, 1999, OFP obtained a DRI development order (DO) from the County. In pertinent part, the DRI DO required that OFP not adversely affect historical flow of surface water entering the property from off-site sources. Historical flow was to be determined in a study commissioned by the County and SWFWMD. The DO appeared to provide that the study was to be reviewed by OFP and the County and approved by SWFWMD. Based on the study, a control structure and pipe was to be constructed, operated and maintained by the County at the upstream side of the property that would limit the quantity of off-site historical flow, unless otherwise approved by OFP. OFP was to provide the County with a drainage easement for this control structure and pipe, as well as a flowage easement from this structure, through OFP property, to an outfall into Lake Hancock. The DO specified that the flowage easement was to be for quantitative purposes only and not to provide water quality treatment for off-site flows. The DO required OFP to grant a defined, temporary easement prior to first plat approval. In its November 11, 1999, response to SWFWMD's request for additional information, the County indicated it would obtain drainage easements and that it was seeking written acknowledgment from OFP accepting the proposed increases in lake stages. During the ERP application review process, the County continued efforts to obtain flowage easements or control over the proposed project area and OFP's acknowledgment and acceptance of the increase in lake stages. At OFP's invitation, the County drafted a proposed cross-flow easement. But before a binding agreement could be executed, a dispute arose between OFP and the County concerning other aspects of OFP's development plans, and OFP refused to enter into an agreement on the cross- flow easement unless all other development issues were resolved as well. On August 4, 2000, in response to SWFWMD's request that the County provide documentation of drainage easements and/or OFP's acceptance of the increased lake stages on OFP property, the County submitted a proposed and un-executed Perpetual Flowage and Inundation Easement and an Acknowledgment to be signed by OFP accepting the increased lake stages. On August 7, 2000, the OFP property was annexed by the City of Bartow (the City). On October 16, 2000, the City enacted Ordinance No. 1933-A approving OFP's DRI application. The City's DO contained essentially the same provision on Off- Site Flow contained in the County's DO. See Finding 18, supra. However, the City's DO specified that the historical flow study was required to be reviewed and approved by OFP (as well as by the County and by SWFWMD). OFP has not given formal approval to historical flow studies done to date. On October 6, 2000, SWFWMD issued a Notice of Final Agency Action approving Polk County ERP No. 4419803.000. Permit Specific Condition No. 7 provides that "all construction is prohibited within the permitted project area until the Permittee acquires legal ownership or legal control of the project area as delineated in the permitted construction drawings." As a result of this permit condition, the County cannot undertake construction as authorized under the Permit until any needed easement or legal control is obtained. Precise Easement Route Approximately two months before final hearing, a dispute arose as to the precise cross-flow easement route proposed by the County. OFP had understood that the County's proposed route was based on a detailed survey. But closer scrutiny of the County's proposed route indicated that it cut corners of existing lakes on OFP's property, crossed residential lots proposed by OFP, and veered north into uplands (also proposed for residential use) in the western portion of the route before looping south and then north again to the outfall at Lake Hancock. Information subsequently revealed in the course of discovery suggested that the County's proposed route may have been based on pre-reclamation topography of OFP's property. After OFP recognized the implications of the cross- flow easement route being proposed by the County, OFP provided the County with several different alternative easement routes through the OFP property. While agreement as to the precise route has not yet been reached, the precise route of the easement is not significant to the County, as long as water can flow across OFP property to Lake Hancock and so long as the County does not have to re-locate existing ditches. Such adjustments in the location of the proposed flowage easement would not affect SWFWMD staff's recommendation for permit issuance, as long as it covered the defined project areas. In addition, OFP's current site plan is a preliminary, conceptual plan subject to change before it is finalized. Regardless what cross-flow easement route is chosen, it will be temporary and subject to modification when OFP's development plan is finalized. If the County is unable to not negotiate a flowage easement across OFP property, it could obtain whatever easement is required through use of the County's eminent domain powers. The County's acquisition of an easement to accommodate a flowage route and anticipated increased stage on OFP property gives reasonable assurance that any stage increases will not cause adverse impacts to OFP property and gives reasonable assurance that the County will have sufficient legal control to construct and maintain the improvements. Project Area The County applied for a Standard General Permit and specified a total project area of 0.95 acre. This acreage reflects the area required for actual construction and alteration of control structures and drainage ditches in the preexisting Eagle-Millsite-Hancock system. It does not reflect the entire acreage drained by that system (approximately 1,800 to 2,000 acres). It also does not reflect the area of the cross-flow easement, which the County has yet to obtain. When determining project size for purposes of determining the type of permit applicable to a project, SWFWMD staff considers maximum project area to be limited to the acreage owned or controlled by the applicant. In addition, since this is a retrofit project for improvement of an existing drainage system not now owned or controlled by the County, SWFWMD staff only measured the area required for actual construction and alteration of control structures and drainage ditches. Future easements necessary for future maintenance of the system were not included. When OFP applied for its conceptual ERP for its proposed DRI, the project area was considered to be the acreage owned by OFP. The rest of the basin draining through OFP's property to Lake Hancock (again, approximately 1,800 to 2,000 acres) was not considered to be part of the project area. Water Quantity Impacts The County's project will retrofit certain components of the same drainage system which OFP will utilize for surface water management and treatment pursuant to its conceptual ERP. Modeling presented in the County's application demonstrates that there will be some rises and some lowering of some of the lake levels on OFP's property during certain rain events. Anticipated rises are lower than the top of banks authorized in OFP's conceptual permit; hence the system will continue to function properly. While there are some differences in the County's permit application and OFP's conceptual permit application concerning modeling estimates of flow rates through OFP property, the differences are minor and are attributed to differences in modeling inputs. The County used more detailed modeling information. Any such differences are not significant. Differences in flow rates provided in the County's proposed permit and in OFP's conceptual permit do not render the permits as incompatible. If the County's permit were issued, any modeling undertaken in connection with a subsequent application by OFP for a construction permit would have to be updated to include the County's improvements to the system. This outcome is not a basis for denial of the County's permit. While the rate at which water will flow through the system will increase, no change in volume of water ultimately flowing through the drainage system is anticipated as a result of the County's proposed improvements. The increased lake stages which are anticipated to occur on OFP property as a result of the County's project will not cause adverse water quantity impacts to the receiving waters of Lake Hancock or adjacent lands. The project will not cause adverse flooding to on-site or off-site property. The project will not cause adverse impacts to existing surface water storage and conveyance capabilities. The project will not adversely impact the maintenance of surface or ground water levels or surface water flows established pursuant to Chapter 373.042, Florida Statutes. Water Quality Impacts No adverse impacts to water quality on OFP property are anticipated from the County's proposed drainage improvements. The project will not add any pollutant loading source to the drainage system and is not expected to cause any algae blooms or fish kills in OFP waters or cause any additional nutrient loading into OFP's surface water management systems. As reclaimed phosphate mine pits, the lakes on OFP's property are high in phosphates. Meanwhile, water quality in upstream in Millsite Lake and Eagle Lake is very good. Off-site flow of higher quality water flushing the OFP lakes will improve the water quality on the OFP site. The County's project will have no adverse impact on the quality of water in the downstream receiving of Lake Hancock (which currently has poor water quality due in large part to past phosphate mining). Upstream of OFP, the project will not cause any adverse water quality impacts and is anticipated to result in positive impacts by lessening the duration of any flooding event and thereby lessening septic tank inundation from flooding. This will have a beneficial impact on public health, safety, and welfare. Thus, there is a public benefit to be gained in having the County undertake the proposed drainage and flood control improvements now, rather than waiting for OFP to finalize its plat and construct its development project. The County's proposed improvements do not require any formal water quality treatment system. The improvements are to a conveyance system and no impervious surfaces or other facilities generating pollutant loading will be added. Upstream of OFP, the Eagle-Millsite-Hancock drainage system flows through natural lakes and wetlands systems that provide natural water quality treatment of the existing drainage basin. OFP expressed concern that the County's improvements to drainage through these areas (including the ditch maintenance already performed in 1998) will increase flow and reduce residence time, thereby reducing natural water quality treatment. But ditch maintenance does not require an ERP, and the County gave reasonable assurances that reduction in natural water quality treatment will not be significant, especially in view of the good quality of the water flowing through the system out of Eagle Lake and Millsite Lake. As a result, it is found that the County's proposed project will not adversely affect the quality of receiving waters such that any applicable quality standards will be violated. Indeed, OFP's expert consultant conceded in testimony at final hearing that OFP has no reason to be concerned about the quality of water at present. Rather, OFP's real concern is about water quality in the future. Essentially, OFP is asking SWFWMD to require the County to guarantee OFP that future development in the area will not lead to any water quality problems. Requiring such a guarantee as a condition to issuance of an ERP would go far beyond SWFWMD requirements and is never required of any applicant. Besides being speculative on the evidence in this case, future development in the area will be required to meet applicable SWFWMD water quality requirements. SWFWMD permitting required for such future development would be the proper forum for OFP to protect itself against possible future reduction in water quality (as well as possible future increase in water quantity). Environmental Impacts The drainage ditches to be improved by the County's project were originally constructed before 1984. These upland cut ditches were not constructed for the purpose of diverting natural stream flow, and are not known to provide significant habitat for any threatened or endangered species. The County provided reasonable assurance that the proposed project will not change the hydroperiod of a wetland or other surface water, so as to adversely affect wetland functions or other surface water functions. The functions of the wetlands and surface waters to be affected by the proposed project include conveyance, some water quality treatment, and possibly some wildlife movement or migration functions between the wetlands served by the ditches. Wetland impacts from the project consists of .63 acre of permanent impacts and .21 acre of temporary impacts, for a total of .84 acre of impact. The permanent impacts consist of the replacement of pipes with new structures in the ditches and the addition of rip rap in areas to prevent sedimentation and erosion. The proposed project's anticipated increase in the rate of flow is expected to lessen the duration of any flooding event at the upper end of the drainage system, and at the downstream end is expected to create a subsequent rise in some of the lakes and storage areas on the OFP property during certain rain events. The anticipated rise in some of the reclaimed lakes on OFP property is not anticipated to have any adverse impact on the functions that those surface waters provide to fish, wildlife or any threatened or endangered species. The reclaimed lakes subject to rise in water levels for certain rain events are steep-sided and do not have much littoral zone, and little, if any, loss of habitat will result. The County's application provides reasonable assurance that the anticipated stage increase in affected wetlands or surface waters will not adversely affect the functions provided by those wetlands or surface waters. The County provided reasonable assurance that the proposed project will not violate water quality standards in areas where water quality standards apply, in either the short- term or the long-term. Long-term effects were addressed in Finding 43-51, supra. Short-term water quality impacts anticipated during the construction of the proposed improvements will be addressed through the use of erosion and sediment controls. The proposed project also will not create any adverse secondary impacts to water resources. The project will not cause any adverse impacts to the bird rookery located to the north on OFP property. The project will not cause any adverse impacts to the bass in OFP's lakes, a concern expressed by OFP relatively recently. To the contrary, since the project will improve water quality in OFP's lakes, the impact on OFP's bass is expected to be positive. OFP raised the issue of a bald eagle nesting site located on its property. The evidence was that a pair of bald eagles has built a nest atop a Tampa Electric Company (TECO) power pole on the property in October of each year since 1996. Each year the pair (which is thought to be the same pair) has used a different TECO power pole. Most of the nests, including the one built in October 2000, have been on poles well south of any construction proposed under the County's ERP and clearly outside of the primary and secondary eagle management zones designated by the U.S. Fish and Wildlife Service. But one year, a nest was built on a pole farther north and possibly within the secondary eagle management zone. OFP presented testimony that U.S. Fish and Wildlife would require OFP to apply for an "incidental take" in order to build homes within the primary eagle protection zones around any of the four poles on which eagles have built nests since 1996; timing of construction of homes within the secondary protection zones may be affected. Even accepting OFP's testimony, there was no evidence as to how U.S. Fish and Wildlife would view construction of the County's proposed drainage improvements on OFP property within those zones. In addition, the evidence was that, in order to accomplish its DRI plans to build homes in the vicinity of the TECO power poles that have served as eagle nests in recent years, without having to apply for an "incidental take," OFP plans to place eagle poles (more suitable for eagle nests than power poles, which actually endanger the eagles) in another part of its property which is much more suitable habitat in order to encourage the eagles to build their nest there. The new location would put the County's proposed construction activity far outside the primary and secondary eagle management zones. Other Permitting Requirements The County's proposed project is capable, based on generally accepted scientific engineering and scientific principles, of being effectively performed and of functioning as proposed. The County has the financial, legal, and administrative capability of ensuring that the activity proposed to be undertaken can be done in accordance with the terms and conditions of the permit. No evidence was presented by Petitioner that the Project will cause adverse impacts to any work of the District established under Section 373.086, Florida Statutes. No evidence was presented by Petitioner that the project will not comply with any applicable special basin or geographic area criteria established under Chapter 40D-3, Florida Administrative Code.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order issuing Standard General Environmental Resource Permit No. 4419803.000. DONE AND ENTERED this 17th day of September, 2001, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of September, 2001. COPIES FURNISHED: Linda L. McKinley, Esquire Polk County Attorney's Office Post Office Box 9005, Drawer AT01 Bartow, Florida 33831-9005 Gregory R. Deal, Esquire 1525 South Florida Avenue, Suite 2 Lakeland, Florida 33803 Margaret M. Lytle, Esquire Martha A. Moore, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899 E. D. Sonny Vergara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899
The Issue The issues in this case are whether International Paper Company (IP) is entitled to National Pollutant Discharge Elimination System (NPDES) Permit No. FL0002526 issued by Department of Environmental Protection (Department) and whether the Department should approve Consent Order No. 08-0358, for the operation of IP’s paper mill in Cantonment, Escambia County, Florida.
Findings Of Fact The Department is the state agency authorized under Chapter 403, Florida Statutes (2008), to regulate discharges of industrial wastewater to waters of the state. Under a delegation from the United States Environmental Protection Agency, the Department administers the NPDES permitting program in Florida. IP owns and operates the integrated bleached kraft paper mill in Cantonment. FOPB is a non-profit Alabama corporation established in 1988 whose members are interested in protecting the water quality and natural resources of Perdido Bay. FOPB has approximately 450 members. About 90 percent of the members own property adjacent to Perdido Bay. James Lane is the president of FOPB. Jacqueline Lane and James Lane live on property adjacent to Perdido Bay. The mill's wastewater effluent is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. Perdido Bay is approximately 28 square miles in area. U.S. Highway 90 crosses the Bay, going east and west, and forms the boundary between what is often referred to as the "Upper Bay" and "Lower Bay." The Bay is relatively shallow, especially in the Upper Bay, ranging in depth between five and ten feet. At the north end of Perdido Bay is a large tract of land owned by IP, known as the Rainwater Tract. The northern part of the tract is primarily fresh water wetlands. The southern part is a tidally-affected marsh. The natural features and hydrology of the fresh water wetlands have been substantially altered by agriculture, silviculture, clearing, ditching, and draining. Tee Lake and Wicker Lake are small lakes (approximately 50 acres in total surface area) within the tidal marsh of the Rainwater Tract. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to the lakes from Perdido Bay. Florida Pulp and Paper Company first began operating the Cantonment paper mill in 1941. St. Regis Paper Company acquired the mill in 1946. In 1984, Champion International Corporation (Champion) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such as printing and writing grades of paper. The mill is integrated, meaning that it brings in logs and wood chips, makes pulp, and produces paper. The wood is chemically treated in cookers called digesters to separate the cellulose from the lignin in the wood because only the cellulose is used to make paper. Then the "brown stock" from the digesters goes through the oxygen delignification process, is mixed with water, and is pumped to paper machines that make the paper products. In 1989, the Department and Champion signed a Consent Order to address water quality violations in Elevenmile Creek. Pursuant to the Consent Order, Champion commissioned a comprehensive study of the Perdido Bay system that was undertaken by a team of scientists led by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed by a series of related scientific studies (“the Livingston studies"). Champion was granted variances from the water quality standards in Elevenmile Creek for iron, specific conductance, zinc, biological integrity, un-ionized ammonia, and dissolved oxygen (DO). In 2001, IP and Champion merged and Champion’s industrial wastewater permit and related authorizations were transferred to IP. In 2002, IP submitted a permit application to upgrade its wastewater treatment plant (WWTP) and relocate its discharge. The WWTP upgrades consist of converting to a modified activated sludge treatment process, increasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (mgd). IP proposes to convey the treated effluent by pipeline 10.7 miles to the Rainwater Tract, where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and upper Perdido Bay. IP's primary objective in upgrading the WWTP was to reduce the nitrogen and phosphorus in the mill's effluent discharge. The upgrades are designed to reduce un-ionized ammonia, total soluble nitrogen, and phosphorus. They are also expected to achieve a reduction of biological oxygen demand (BOD) and TSS. IP plans to obtain up to 5 mgd of treated municipal wastewater from a new treatment facility planned by the Emerald Coast Utility Authority (ECUA), which would be used in the paper production process and would reduce the need for groundwater withdrawals by IP for this purpose. The treated wastewater would enter the WWTP, along with other process wastewater and become part of the effluent conveyed through the pipeline to the wetland tract. The effluent limits required by the proposed permit include technology-based effluent limits (TBELs) that apply to the entire pulp and paper industry. TBELs are predominantly production-based, limiting the amount of pollutants that may be discharged for each ton of product that is produced. The proposed permit also imposes water quality-based effluent limits (WQBELs) that are specific to the Cantonment mill and the waters affected by its effluent discharge. The WQBELs for the mill are necessary for certain constituents of the mill's effluent because the TBELs, alone, would not be sufficient to prevent water quality criteria in the receiving waters from being violated. The Livingston studies represent perhaps the most complete scientific evaluation ever made of a coastal ecosystem. Dr. Livingston developed an extensive biological and chemical history of Perdido Bay and then evaluated the nutrient loadings from Elevenmile Creek over a 12-year period to correlate mill loadings with the biological health of the Bay. The Livingston studies confirmed that when nutrient loadings from the mill were high, they caused toxic algae blooms and reduced biological productivity in Perdido Bay. Some of the adverse effects attributable to the mill effluent were most acute in the area of the Bay near the Lanes' home on the northeastern shore of the Bay because the flow from the Perdido River tends to push the flow from Elevenmile Creek toward the northeastern shore. Because Dr. Livingston determined that the nutrient loadings from the mill that occurred in 1988 and 1989 did not adversely impact the food web of Perdido Bay, he recommended effluent limits for ammonia nitrogen, orthophosphate, and total phosphorous that were correlated with mill loadings of these nutrients in those years. The Department used Dr. Livingston’s data, and did its own analyses, to establish WQBELs for orthophosphate for drought conditions and for nitrate-nitrite. WQBELs were ultimately developed for total ammonia, orthophosphate, nitrate-nitrite, total phosphorus, BOD, color, and soluble inorganic nitrogen. The WQBELs in the proposed permit were developed to assure compliance with water quality standards under conditions of pollutant loadings at the daily limit (based on a monthly average) during low flow in the receiving waters. Petitioners did not dispute that the proposed WWTP is capable of achieving the TBELs and WQBELs. Their main complaint is that the WQBELs are not adequate to protect the receiving waters. A wetland pilot project was constructed in 1990 at the Cantonment mill into which effluent from the mill has been discharged. The flora and fauna of the pilot wetland project have been monitored to evaluate how they are affected by IP’s effluent. An effluent distribution system is proposed for the wetland tract to spread the effluent out over the full width of the wetlands. This would be accomplished by a system of berms running perpendicular to the flow of water through the wetlands, and gates and other structures in and along the berms to gather and redistribute the flow as it moves in a southerly direction toward Perdido Bay. The design incorporates four existing tram roads that were constructed on the wetland tract to serve the past and present silvicultural activities there. The tram roads, with modifications, would serve as the berms in the wetland distribution system. As the effluent is discharged from the pipeline, it would be re-aerated and distributed across Berm 1 through a series of adjustable, gated openings. Mixing with naturally occurring waters, the effluent would move by gravity to the next lower berm. The water will re-collect behind each of the vegetated berms and be distributed again through each berm. The distance between the berms varies from a quarter to a half mile. Approximately 70 percent of the effluent discharged into the wetland would flow a distance of approximately 2.3 miles to Perdido Bay. The remaining 30 percent of the effluent would flow a somewhat shorter distance to lower Elevenmile Creek. A computer simulation performed by Dr. Wade Nutter indicated that the effluent would move through the wetland tract at a velocity of approximately a quarter-of-a-foot per second and the depth of flow across the wetland tract will be 0.6 inches. It would take four or five days for the effluent to reach lower Elevenmile Creek and Perdido Bay. As the treated effluent flows through the wetland tract, there will be some removal of nutrients by plants and soil. Nitrogen and phosphorous are expected to be reduced approximately ten percent. BOD in the effluent is expected to be reduced approximately 90 percent. Construction activities associated with the effluent pipeline, berm, and control structures in the wetland tract, as originally proposed, were permitted by the Department through issuance of a Wetland Resource Permit to IP. The United States Army Corps of Engineers has also permitted this work. Petitioners did not challenge those permits. A wetland monitoring program is required by the proposed permit. The stated purpose of the monitoring program is to assure that there are no significant adverse impacts to the wetland tract, including Tee and Wicker Lakes. After the discharge to the wetland tract commences, the proposed permit requires IP to submit wetland monitoring reports annually to the Department. A monitoring program was also developed by Dr. Livingston and other IP consultants to monitor the impacts of the proposed discharge on Elevenmile Creek and Perdido Bay. It was made a part of the proposed permit. The proposed Consent Order establishes a schedule for the construction activities associated with the proposed WWTP upgrades and the effluent pipeline and for incremental relocation of the mill's discharge from Elevenmile Creek to the wetland tract. IP is given two years to complete construction activities and begin operation of the new facilities. At the end of the construction phase, least 25 percent of the effluent is to be diverted to the wetland tract. The volume of effluent diverted to the wetlands is to be increased another 25 percent every three months thereafter. Three years after issuance of the permit, 100 percent of the effluent would be discharged into the wetland tract and there would no longer be a discharge into Elevenmile Creek. The proposed Consent Order establishes interim effluent limits that would apply immediately upon the effective date of the Consent Order and continue during the two-year construction phase when the mill would continue to discharge into Elevenmile Creek. Other interim effluent limits would apply during the 12- month period following construction when the upgraded WWTP would be operating and the effluent would be incrementally diverted from Elevenmile Creek to the wetland tract. A third set of interim effluent limits would apply when 100 percent of the effluent is discharged into the wetland tract. IP is required by the Consent Order to submit quarterly reports of its progress toward compliance with the required corrective actions and deadlines. Project Changes After the issuance of the Final Order in 05-1609, IP modified its manufacturing process to eliminate the production of white paper. IP now produces brown paper for packaging material and “fluff” pulp used in such products as filters and diapers. IP’s new manufacturing processes uses substantially smaller amounts of bleach and other chemicals that must be treated and discharged. IP reduced its discharge of BOD components, salts that increase the specific conductance of the effluent, adsorbable organic halides, and ammonia. IP also reduced the odor associated with its discharge. In the findings that follow, the portion of the Rainwater Tract into which IP proposes to discharge and distribute its effluent will be referred to as the “effluent distribution system,” which is the term used by Dr. Nutter in his 2008 “White Paper” (IP Exhibit 23). The effluent distribution system includes the berms and other water control structures as well as all of the natural areas over which IP’s effluent will flow to Perdido Bay. Most of the existing ditches, sloughs, and depressions in the effluent distribution system are ephemeral, holding water only after heavy rainfall or during the wet season. Even the more frequently wetted features, other than Tee and Wicker Lakes, intermittently dry out. There is currently little connectivity among the small water bodies that would allow fish and other organisms to move across the site. Fish and other organisms within these water bodies are exposed to wide fluctuations in specific conductivity, pH, and DO. When the water bodies dry out, the minnows and other small fish die. New populations of fish enter these water bodies from Elevenmile Creek during high water conditions, or on the feet of water birds. IP's consultants conducted an extensive investigation and evaluation of animal and plant communities in the Rainwater Tract in coordination with scientists from the Department and the Florida Fish and Wildlife Conservation Commission. Among the habitats that were identified and mapped were some wet prairies, which are designated “S-2," or imperiled, in the Florida Natural Area Inventory. In these wet prairies are rare and endangered pitcher plants. IP modified the design of the proposed effluent distribution system to shorten the upper berms and remove 72.3 acres of S-2 habitat. The total area of the system was reduced from 1,484 acres to 1,381 acres. The proposed land management activities within the effluent distribution system are intended to achieve restoration of historic ecosystems, including the establishment and maintenance of tree species appropriate to the various water depths in the system, and the removal of exotic and invasive plant species. A functional assessment of the existing and projected habitats in the effluent distribution system was performed. The Department concluded that IP’s project would result in a six percent increase in overall wetland functional value within the system. That estimate accounts for the loss of some S-2 habitat, but does not include the benefits associated with IP’s conservation of S-2 habitat and other land forms outside of the effluent distribution system. IP proposes to place in protected conservation status 147 acres of wet prairie, 115 acres of seepage slope, and 72 acres of sand hill lands outside the effluent distribution system. The total area outside of the wetland distribution system that the Consent Order requires IP to perpetually protect and manage as conservation area is 1,188 acres. The Consent Order was modified to incorporate many of the wetland monitoring provisions that had previously been a part of the former experimental use of wetlands authorization. IP proposes to achieve compliance with all proposed water quality standards and permit limits by the end of the schedule established in the Consent Order, including the water quality standards for specific conductance, pH, turbidity, and DO, which IP had previously sought exceptions for pursuant to Florida Administrative Code Rule 62-660.300(1). Limitation of Factual Issues As explained in the Conclusions of Law, the doctrine of collateral estoppel bars the parties in these consolidated cases from re-litigating factual issues that were previously litigated by them in DOAH Case No. 05-1609. The Department’s Final Order of August 8, 2007, determined that IP had provided reasonable assurance that the NPDES permit, Consent Order, exception for the experimental use of wetlands, and variance were in compliance with all applicable statutes and rules, except for the following area: the evidence presented by IP was insufficient to demonstrate that IP’s wastewater effluent would not cause significant adverse impact to the biological community of the wetland tract, including Tee and Wicker Lakes. Following a number of motions and extensive argument on the subject of what factual issues raised by Petitioners are proper for litigation in this new proceeding, an Order was issued on June 2, 2009, that limited the case to two general factual issues: Whether the revised Consent Order and proposed permit are valid with respect to the effects of the proposed discharge on the wetland system, including Tee and Wicker Lakes, and with respect to any modifications to the effluent distribution and treatment functions of the wetland system following the Final Order issued in DOAH Case No. 05- 1609; and Whether the December 2007 report of the Livingston team demonstrates that the WQBELS are inadequate to prevent water quality violations in Perdido Bay. Petitioners’ Disputes Petitioners’ proposed recommended orders include arguments that are barred by collateral estoppel. For example, Jacqueline Lane restates her opinions about physical and chemical processes that would occur if IP’s effluent is discharged into the wetlands, despite the fact that some of these opinions were rejected in DOAH Case No. 05-1609. Dr. Lane believes that IP’s effluent would cause adverse impacts from high water temperatures resulting from color in IP’s effluent. There is already color in the waters of the effluent distribution system under background conditions. The increased amount of shading from the trees that IP is planting in the effluent distribution system would tend to lower water temperatures. Peak summer water temperatures would probably be lowered by the effluent. Petitioners evidence was insufficient to show that the organisms that comprise the biological community of the effluent distribution system cannot tolerate the expected range of temperatures. Dr. Lane also contends that the BOD in IP's effluent would deplete DO in the wetlands and Tee and Wicker Lakes. Her contention, however, is not based on new data about the effluent or changes in the design of the effluent distribution system. There is a natural, wide fluctuation in DO in the wetlands of the effluent distribution system because DO is affected by numerous factors, including temperature, salinity, atmospheric pressure, turbulence, and surface water aeration. There are seasonal changes in DO levels, with higher levels in colder temperatures. There is also a daily cycle of DO, with higher levels occurring during the day and lower levels at night. It is typical for DO levels in wetlands to fall below the Class III water quality standard for DO, which is five milligrams per liter (mg/l). An anaerobic zone in the water column is beneficial for wetland functions. DO levels in the water bodies of the effluent distribution system currently range from a high of 11 to 12 mg/l to a low approaching zero. The principal factor that determines DO concentrations within a wetland is sediment oxygen demand (SOD). SOD refers to the depletion of oxygen from biological responses (respiration) as well as oxidation-reduction reactions within the sediment. The naturally occurring BOD in a wetland is large because of the amount of organic material. The BOD associated with IP’s effluent would be a tiny fraction of the naturally occurring BOD in the effluent distribution system and would be masked by the effect of the SOD. It was estimated that the BOD associated with IP's effluent would represent only about .00000000001 percent of the background BOD, and would have an immeasurable effect. Dr. Pruitt’s testimony about oxygen dynamics in a wetland showed that IP’s effluent should not cause a measurable decrease in DO levels within the effluent distribution system, including Tee and Wicker Lakes. FOPB and James Lane assert that only 200 acres of the effluent distribution system would be inundated by IP’s effluent, so that the alleged assimilation or buffering of the chemical constituents of the effluent would not occur. That assertion misconstrues the record evidence. About 200 acres of the effluent distribution system would be permanently inundated behind the four berms. However, IP proposes to use the entire 1,381-acre system for effluent distribution. The modifications to the berms and the 72-acre reduction in the size of the effluent distribution system would not have a material effect on the assimilative capacity of system. The residence time and travel time of the effluent in the system, for example, would not be materially affected. Variability in topography within the effluent distribution system and in rainfall would affect water depths in the system. The variability in topography, including the creation of some deeper pools, would contribute to plant and animal diversity and overall biological productivity within the system. The pH of the effluent is not expected to change the pH in the effluent distribution system because of natural buffering in the soils. The specific conductance (saltiness) of IP’s effluent is not high enough to adversely affect the biological community in the fresh water wetlands of the effluent distribution system. IP is already close to maintaining compliance with the water quality standard for specific conductance and would be in full compliance by the end of the compliance schedule established in the proposed Consent Order. After the 2007 conversion to brown paper manufacturing, IP’s effluent has shown no toxicity. The effluent has passed the chronic toxicity test, which analyzes the potential for toxicity from the whole effluent, including any toxicity arising from additive or synergistic effects, on sensitive test organisms. Dr. Lane points out that the limits for BOD and TSS in the proposed NPDES permit exceed the limits established by Department rule for discharges of municipal wastewater into wetlands. However, paper mill BOD is more recalcitrant in the environment than municipal wastewater BOD and less “bio- available” in the processes that can lower DO. In addition, the regulatory limits for municipal wastewater are technology-based, representing “secondary treatment.” The secondary treatment technology is not applicable to IP’s wastewater. Sampling in the pilot wetland at the paper mill revealed a diversity of macroinvertebrates, including predator species, and other aquatic organisms. Macroinvertebrates are a good measure of the health of a water body because of their fundamental role in the food web and because they are generally sensitive to pollutants. Petitioners contend that the pilot wetland at the paper mill is not a good model for the effect of the IP’s effluent in the wetland distribution system, primarily because of the small amount of effluent that has been applied to the pilot wetland. Although the utility of the pilot wetland data is diminished in this respect, it is not eliminated. The health of the biological community in the pilot wetland contributes to IP’s demonstration of reasonable assurance that the biological community in the effluent distribution system would not be adversely affected. The effluent would not have a significant effect on the salinity of Tee and Wicker Lakes. Under current conditions, the lakes have a salinity of less than one part per thousand 25 percent of the time, less than 10 parts per thousand 53 percent of the time, and greater than 10 parts per thousand 22 percent of the time. In comparison, marine waters have a salinity of 2.7 parts per thousand. IP’s effluent would not affect the lower end of the salinity range for Tee and Wicker Lakes, and would cause only a minor decrease in the higher range. That minor decrease should not adversely affect the biota in Tee and Wicker Lakes or interfere with their nursery functions. The proposed hydrologic loading rate of the effluent amounts to an average of six-tenths of an inch over the area of effluent distribution system. The addition of IP’s effluent to the wetlands of the effluent distribution system and the creation of permanent pools would allow for permanent fish populations and would increase the opportunity for fish and other organisms to move across the effluent distribution system. Biological diversity and productivity is likely to be increased in the effluent distribution system. By improving fish habitat, the site would attract wading birds and other predatory birds. Although the site would not be open to public use (with the exception of Tee and Wicker Lakes), recreational opportunities could be provided by special permission for guided tours, educational programs, and university research. Even if public access were confined to Tee and Wicker Lakes, that would not be a reduction in public use as compared to the existing situation. IP’s discharge, including its discharges subject to the interim limits established in the Consent Order, would not interfere with the designated uses of the Class III receiving waters, which are the propagation and maintenance of a healthy, well-balanced population of fish and wildlife. The wetlands of the effluent distribution system are the “receiving waters” for IP’s discharge. The proposed project would not be unreasonably destructive to the receiving waters, which would involve a substantial alteration in community structure and function, including the loss of sensitive taxa and their replacement with pollution-tolerant taxa. The proposed WQBELs would maintain the productivity in Tee and Wicker Lakes. There would be no loss of the habitat values or nursery functions of the lakes which are important to recreational and commercial fish species. IP has no reasonable, alternative means of disposing of its wastewater other than by discharging it into waters of the state. IP has demonstrated a need to meet interim limits for a period of time necessary to complete the construction of its alternative waste disposal system. The interim limits and schedule for coming into full compliance with all water quality standards, established in the proposed Consent Order, are reasonable. The proposed project is important and beneficial to the public health, safety, and welfare because (1) economic benefits would accrue to the local and regional economy from the operation of IP’s paper mill, (2) Elevenmile Creek would be set on a course of recovery, (3) the wetlands of the effluent distribution system would become a site of greater biological diversity and productivity, (4) the environmental health of Perdido Bay would be improved, (5) the Department’s decades-long enforcement action against IP would be concluded, (6) substantial areas of important habitat would be set aside for permanent protection, and (7) the effluent distribution system would yield important information on a multitude of scientific topics that were debated by these parties. The proposed project would not adversely affect the conservation of fish or wildlife or their habitats. The proposed project would not adversely affect fishing or water-based recreational values or marine productivity in the vicinity of the proposed discharge. There is no Surface Water Improvement and Management Plan applicable to IP’s proposed discharge. The preponderance of the record evidence establishes reasonable assurance that IP’s proposed project would comply with all applicable laws and that the Consent Order establishes reasonable terms and conditions to resolve the Department’s enforcement action against IP for past violations.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is: RECOMMENDED that the Department enter a final order granting NPDES Permit No. FL0002526 and approving Consent Order No. 08-0358. DONE AND ENTERED this 27th day of January, 2010, in Tallahassee, Leon County, Florida. BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of January, 2010.