Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
THE DELTONA CORPORATION vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 80-001065RX (1980)
Division of Administrative Hearings, Florida Number: 80-001065RX Latest Update: Sep. 15, 1980

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: On May 3, 1978, the petitioner filed with the respondent an application for dredge and fill permits and a water quality certificate to allow petitioner to complete its planned residential community on and adjacent to Marco Island, Florida. the petitioner expended in excess of $100,000.00 in preparing the permit application. The proposed project involves some 4,000 acres of development on approximately 17,000 acres of land owned by the petitioner. On November 28, 1979, after seeking and obtaining additional information from the petitioner, the respondent issued its notice of "intent to deny" the permit application. The Department claims jurisdiction over the proposed project pursuant to Chapter 253 and 403, Florida Statutes, and Section 17-4.28 and 17-4.29, Florida Administrative Code. The nine page "intent to deny" specifically cites Rule 1704.28(3), Florida Administrative Code, and concludes that state water quality standards will be violated. Beyond that regulatory citation, the "intent to deny" does not specify by rule number which of the water quality standards the Department feels would be violated by the proposed project. However, the "intent to deny" does conclude that the area proposed for development will include "approximately 1,500 acres of uplands and approximately 2,600 acres of waters of the State, submerged lands of waters of the State, and transition zone of submerged lands of waters of the State. In discussing the overall impact from the project as a whole, the respondent notes that the intertidal shoreline areas are utilized by wading birds and that the mangrove tidelines provide a vital habitat for fish and wildlife. In discussing the specific work areas, the respondent concludes that the destruction of the extensive freshwater marsh system would eliminate a significant habitat intensely utilized by a wide variety of birds. The "intent to deny" further concludes that the development of the proposed work area would be expected to violate state water quality standards for dissolved oxygen. The respondent's "intent to deny" is the subject of a pending administrative proceeding between these same parties in Case Numbers 79-2471 and 80-683. In those proceedings the petitioner is contesting, inter alia, the respondent's application of the rules under challenge in this proceeding. Although petitioner challenges other rules of the Department, the testimony adduced at the hearing concerned only those rules relating to water quality standards; to wit: Rules 17-3.05, 17-3.08(4) and 17-3.09(3). Dissolved oxygen concentrations are an important gauge of the existing quality of water and the ability of a water body to support a well-balanced aquatic animal life. A concentration of at least 5.0 parts per million (or milligrams per liter) is needed to support a well-balanced fish population, and a concentration of 4.0 mg/1 is about the lowest which will support a varied fish population. There are numerous natural factors which affect the concentration of dissolved oxygen in surface water bodies. Such factors include physical transfer between the water and the atmosphere (aeration), the limit of a water body's ability to absorb oxygen (saturation value), the amount of oxygen used to decompose dead material, photosynthesis of aquatic plants and the actual vertical location of the sampling. These factors are influenced by many variables, such as wind, temperature, stratification, salinity, the season of the year, the time of the day, rainfall, water clarity, mixing and flushing. The level of dissolved oxygen can vary significantly in the same body of water during one twenty-four hour period. A balance of dynamic, natural processes causes dissolved oxygen levels to vary extensively in different water bodies and within the same water body during different times of the day and during different seasons of the year. Some of the water bodies in the Marco Island area contain dissolved oxygen values below 4.0 parts per million (or milligrams per liter) during at least a portion of a twenty-four hour period. This is due to natural, as opposed to manmade, causes. A water body containing levels of dissolved oxygen less than 4.0 milligrams per liter does not necessarily indicate a discharge of contaminants into that water body. The parties have stipulated that the Final Order rendered by the Department of Environmental Regulation in the case of Capeletti Brothers, Inc. v. Dept. of Environmental Regulation, Case No. 79-1602R (July 7, 1980), accurately represents the Department's position with respect to its authority to consider wildlife and other biological factors in reviewing permit applications pursuant to Chapter 403, Florida Statutes.

Florida Laws (6) 120.56120.57403.021403.031403.061403.804
# 1
BOCA GRANDE CLUB, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 85-003849 (1985)
Division of Administrative Hearings, Florida Number: 85-003849 Latest Update: Dec. 19, 1986

Findings Of Fact The applicant currently operates a 58 slip marina Village at the proposed site, which was constructed under a modified permit from the Department in 1980 by Sunset Realty. Subsequent to that construction, the Petitioner commenced its Marina Village project on uplands adjacent to the existing dock facility and entered into a lease with Sunset Realty to operate the present marina as part of its "Boca Grande Club." The operative portion of the existing marina, that is, where boats are moored and operate, is in water eight feet or greater in depth. The marina provides fuel service at a separate fuel dock as well as electric and telephone service at the individual slips, thus permitting boats using the slips to hook up to on- shore electrical and telephone service. Sewage pump-out equipment is available at the fuel dock and a portable sewage pumping facility is available to be moved to each slip as necessary. Boca Grande Club employs a full time dock master who lives aboard a boat at the existing facility. The facility presently generally serves larger craft, that is, boats generally larger than 25 feet in length and serves some vessels in excess of 60 feet in length. The marina village portion of Boca Grande Club is a condominium, residential development, which is nearly completed and will consist of 48 residential units. A second portion of the Boca Grande Club is located on the Gulf of Mexico some 2,000 feet away from the marina village. The entire project employs slightly more than 100 people. The Petitioner contends that the existing marina of 58 slips is not sufficient to provide adequate dock space for the residents of the development, as well as members of Boca Grande Club. It also contends that the existing dock elevations are such as to make access from small boats to the dock difficult. The number of residents or club members requiring boat slips was not established, nor was it shown that efforts to modify existing dock elevations have been attempted unsuccessfully. In any event, the Petitioner applied to the Department on February 15, 1985, to construct the approximate 3450 square feet of additional dock facility. This would include a "T" shaped structure with an access ramp or walkway extending approximately 189 feet toward the existing channel from the shore. The waterward "T" portion will be 237 feet ~n length. Additionally,. an "L" shaped structure with two sections, each approximately 75 feet in length, would be constructed which would accommodate six boat slips. The "T" shaped dock will accommodate 19 boat slips at its waterward end. The docks proposed will contain ten 3' X 15' finger piers with regard to the "T" shaped dock and two 3' X 15' finger piers attached to the "L" shaped dock. The applicant would install 42 mooring pilings in the bottom of Gasparilla Sound for the mooring of boats using the docks. Thus, the applicant proposes the addition of approximately 25 boat slips with the proposed docks, all of which will be located within Gasparilla Sound, in the Charlotte Harbor Aquatic Preserve, an Outstanding Florida Water (OFW). This is a Class II water body pursuant to Chapter 17-3, Florida Administrative Code, and has also been designated an outstanding Florida water, pursuant to Rule 17-3.041, Florida Administrative Code. The docking facility will be located in an area vegetated by sea grass, including turtle grass and associated algae. The access ramp for the "T" dock would be through a mangrove fringe including red, white and black mangroves. The Department's appraisal recommended denial of the application unless certain modifications to the "T" shaped dock are accomplished, including omitting the "T" shaped docking structure or relocating it to an area without grass beds; that the pilings should be driven into place rather than placed in augured holes; that turbidity screens should be installed and staked around the proposed piling site and that no boats over 25 feet in length or equipped with heads or toilets should be allowed to moor at the docking facility, nor should boats be permitted with people living aboard them. On September 5, 1985, the Respondent issued its Intent to Deny indicating that the project was expected to violate water quality standards and that the construction of the dock and the presence of the moored boats attendant to use of the dock would lower existing water quality in terms of turbidity, biological integrity, bacteriological quality, especially as to fecal coliform and total coliform bacteria and based upon the DER's position that the "T" shaped dock would not clearly be in the public interest in several respects. The Department has no objection and proposes to issue a permit for construction of the smaller, "L" shaped dock. In response to the Intent to Deny, the Petitioner resurveyed the seagrasses in the area and located a site where the water depths sloped to deeper water and seagrasses were sparser. It modified its application, moving the waterward extension of the dock over the deeper water in the less dense seagrasses, but could not move the dock to a location to avoid seagrass since to do so would not allow maneuvering room for larger boats utilizing the existing dock. The applicant agreed to the other suggestions of modification by the Respondent. Thus, the applicant subsequently modified the application to include "bow-in" mooring of boats so as to place boat propellors over the deepest possible waters at the mooring site, as well as raising the central portion of the access ramp leading waterward from the shore, to provide for greater light penetration and less shading of seagrasses, as well as narrowing the dock to five feet in width where it passes through the mangrove fringe, so as to limit alteration of the mangroves at the site to only three trees. The Department continues to take the position that the permit should be denied, however, on the basis that the construction of the dock and the presence of the boats attendant to the dock will lower existing water quality in terms of the above particulars and based upon the DER's evaluation that the "T" shaped dock will not clearly be in the public interest. AMBIENT WATER QUALITY The Petitioner tendered C. W. Sheffield, professional engineer, and Dr. Martin Roessler as experts in the field of water quality and they were accepted without objection. The respondent tendered the expert testimony of Mr. Doug Frye and William Porter, respectively a dredge and fill specialist and supervisor and an environmental specialist with the Shellfish Monitoring Program for the Department of Natural Resources, who were accepted as expert witnesses in the areas of water quality and, with regard to Mr. Porter, the impacts of water quality on shellfish. It was thus established that the ambient water quality in the cove which contains the present marina and where the proposed docking facilities would be is generally good. The water meets all relevant State regulatory standards with the exception of fecal coliform and total coliform bacteriological standards for Class II waters. In that regard, repetitive samples have shown violations of the fecal coliform and total coliform bacteriological standards for Class II waters on a number of occasions. The data relied upon concerning fecal coliform organism levels at the project site was collected and analyzed over approximately a one year period during which time the samples were shown to contain fecal coliform and total coliform bacteria in violative concentrations a number of times. Marinas are known discharge sources for fecal coliform organisms. This is especially true of moored boats in marinas which often have toilets or heads which are illegally flushed into the State waters within the marina. The presence of moored boats with heads are known discharge sources of fecal coliform organisms and the boats utilizing the present marina and the proposed project do, and likely will, have toilets on board, which can be improperly discharged into the waters of the marina. This marina has been established to be a source of discharge of fecal coliform organisms in violation of the relevant standard for Class II waters of the State. There presently exists relatively high levels of fecal coliform organisms ranging up to 50 organisms per 100 milliliters of water in the area of the existing marina. This level of concentration exceeds the regulatory standard for fecal coliform bacteria in the Class II water quality rules. Although Mr. Porter discussed the possibility that high levels of coliform bacteria could be caused by birds or animals depositing fecal material in the water, he established that the likely source of elevated levels of this bacteria was improper operation of heads aboard boats, as pointed out by the fact that samples taken in other areas of the Gasparilla Sound away from marina sites do not exhibit the high coliform levels found on repeated occasions at the subject site. Thus, it has been established that the ambient water quality is within State standards for all parameters with the exception of fecal and total coliform bacteria for Class II waters. The Petitioner contends that Class III water standards are appropriately applied herein inasmuch as the Department placed the Class III standards rather than the Class II standards at issue in its Intent to Deny, albeit mistakenly. There is no question, however, that there are Class II waters of the State involved at this site and the subject area is within the aquatic preserve and outstanding Florida waters. The Petitioner is charged with knowledge of this inasmuch as the aquatic preserve boundaries are delimited in the Department's above-cited, published rule. In preparing and processing its application and electing to proceed with this project, the Petitioner is charged with knowledge that these are Class II waters and that the water quality criteria and considerations applicable to Class II outstanding Florida waters are the appropriate parameters with which it must comply. In any event, this is a de novo proceeding and the Department's initial position with regard to this application is not binding in favor of or to the prejudice of any party to the Section 120.57(1), Florida Statutes proceeding. IMPACT ON BENTHIC COMMUNITY ·9. There is a moderate stand of seagrass at the proposed site of the "T" portion of the dock or waterward end of the dock, with dense seagrass beds existing toward the shore, over which the narrower walkway portion of the dock will traverse. Seagrass beds are an especially productive marine community which contribute greatly to the biological diversity in surrounding waters because of their important function in the marine food chain. That function is involved with the seagrasses production of detrital matter consisting of seeds and vegetative material which marine organisms feed upon and upon which organisms larger fish, including commercial and sport fish species, feed upon. Potential adverse impacts caused by a project of this type on the Benthic Community at the project site and especially the seagrass beds involve the potential shading of seagrasses caused by the location of the dock over them, as well as the mooring of boats over them which shading retards or eliminates photosynthesis, which ultimately can kill the seagrass and thus reduce marine productivity in the area. The concentration of boats at such a mooring site as the end of this "T" dock will concentrate the effects of prop scouring, washing and prop dredging, which will have a destructive effect on seagrasses as well as the settling out of sediment from propellor wash or disturbance of the bottom on the seagrasses which can ultimately smother them as well as other marine life forms. In discussing these considerations, it should be pointed out that the "T" portion of the dock would be oriented in a general north-south direction which causes the shadow of the dock to move rapidly as the sun passes overhead in a general east to west direction. This would tend to minimize the effect of shading on the seagrass of the dock itself, particularly with regard to the approach ramp portion of the dock which is relatively narrow. That portion of the dock extending toward the shore runs in an east to west direction and would not exhibit the same rapidly moving shadow, but the central portion of the approach walkway has been elevated to such an extent that light reaching under the dock from both sides will be sufficient to allow photosynthesis of the seagrasses under the dock, although not for as long a period of the day nor at the same rate as would be the case if the dock were not present. The Petitioner asserts that its voluntary relocation of the "T" shaped portion of the dock from an area of dense sea grass to a moderately populated sea grass bed plus the proposed bow-in mooring of boats so as to alleviate propellor damage to the seagrass, together with its view concerning the prevailing water depth at the end of the dock, will serve to prevent damage to the seagrass at the end of the "T" dock where the boats will be moored. It has been shown, however, that the mooring of boats whether bow-in or otherwise will still create a significant amount of shading of the bottom which, together with the shading caused by the "T" dock as well as the associated finger piers will retard or prevent photosynthesis to some extent, especially where boats are moored for days at a time without moving. This will significantly reduce the marine productivity attributable to the seagrass by retarding its natural function or, in some cases, killing it with the resultant loss of the detrital production as well as carbon production, the former being crucial to the proper functioning of the marine food chain in the area. If the seagrass is damaged or extinguished by the shading effect, prop scouring and washing, and/or settlement of turbidity on the seagrass, or a combination of these factors, not only will its productivity be lost, but the biological diversity of marine life in the area will be reduced as it relates to those vertebrate and invertebrate marine animals which depend on seagrass as a food source either directly or indirectly. Dr. Roessler, for the Petitioner, opined that the attached biological communities or "fouling" organisms such as barnacles which would form on the dock pilings, if they were installed, would provide habitat for marine life and invertebrates and thus enhance the biological diversity of the area. These fouling organisms which attach to pilings, however, represent a very narrow portion of the potential marine biological diversity of life forms in an area such as this. Their advent on the pilings, should the pilings be installed, would not mitigate for the loss of important marine habitat and resultant species diversity that elimination of this portion of the seagrass beds would pose. Thus, reasonable assurances have not been established that significant adverse impact to the Benthic Community in the form of damage or elimination of the seagrass beds and their dependent biota will not occur due to shading and propellor scouring, dredging and washing occasioned by the installation of the docking facility. Respondent's expert witnesses Sheftal, Barth, and Dentzau uniformly expressed a concern for propellor scarring, dredging and prop washing of the seagrass beds caused by an improper operation of boats in the project area where water is too shallow over the grass beds to protect them from the resultant propellor damage. In this regard, the Petitioner's own experiments with actual boats indicated that approximately one to 1 1/2 feet of water will remain between the bottom of the sound and the boat propellors at the end of the "T" dock for the general type and size of boats which will use the dock, even assuming that the boats are moored bow inward, thus taking maximum advantage of the deepest water possible under the propellors when a boat engine is started. Respondent's witness Dentzau performed a test with a 21 foot boat with an approximately 100 horsepower outboard engine running it in both forward and reverse at the "T" end of the dock. He was able to readily generate a "plume" of turbidity consisting of sand and other bottom material suspended in the water by the scouring action of the propellor. Although it was demonstrated for water quality parameter considerations that this turbidity plume did not violate the water quality standards for turbidity, it obviously shows that over time the turbidity suspended by boat propellors will settle on the seagrasses and other bottom dwelling biota to their detriment and, more immediately important, demonstrates that prop washing and scouring will occur by boats even if moored bow-in at the presently proposed site of the "T" shaped portion of the dock. The Petitioner proposes by the configuration of its "L" shaped dock in conjunction with the IT" shaped dock, as well as with buoy lines, to keep boat traffic away from the dense grass beds surrounding the proposed dock site and over which the walkway will extend. The Petitioner will mark the entrance channel to the marina itself to keep boats from straying over adjacent grass beds. It has not been demonstrated, however, what steps can be taken to effectively prevent boats from approaching the side of the proposed dock around the ends of the buoy lines and over the dense grass beds toward prohibitively shallow water where prop scouring and scarring will occur. Further, although the Petitioner will mark the entrance channel to the marina itself to keep boats from straying over adjacent dense grass beds, the likelihood of propellor damage to the grass beds in the vicinity of the end of the "T" dock has been exacerbated by the concentration of boat traffic which will result by installation of that dock, over waters at the mooring site which are of insufficient depth to protect the grass bed at that location from scouring and washing from boat propellors. In view of these reasons, significant adverse impacts to the Benthic Communities and especially to the grass beds themselves will result by installation of the docking facility at the site proposed, primarily because of insufficient water depth for safe operation of boats in relation to the well-being of the grass beds in the vicinity of the end of the dock and because of the shading which will result by installation of the "T" shaped portion of the dock in conjunction with the boats to be moored to it and the finger piers between the boat slips attached to it. WATER QUALITY The Respondent, through its water quality expert witness, Doug Frye, expressed the concern that the proposed project would violate Rule 17-3.051, Florida Administrative Code, which requires that the State's waters be free from pollutants above a certain level measured by various accepted and codified scientific methods of measurement. In this regard, the primary concern of the Department is bacteriological quality as well as turbidity resulting from boat operation. The turbidity standards contained in the above Rule provides that State waters not exceed 29 nephelometric turbidity units above the natural background level. The Respondent contends that this level will be exceeded as a result of operation of boats in the vicinity of the dock. The Petitioner, however, presented a soils analysis and silt settling study which showed that bottom materials in the area involved consist of sand, with some finely pulverized shell and that this material settles very rapidly after being disturbed with little silt remaining in suspension a significant period of time after the disturbance. This is primarily because the level of organics in the bottom substrate is very low at this site. In this connection, the Petitioner's expert witness, Mr. Sheffield, anchored a 16 foot boat with a 40 horsepower outboard motor in the docking area of the proposed project. He operated the boat at 1,000 RPM for an extended period of time while measuring the resultant turbidity. The results of his measurements showed turbidity to be in the range of 5-11 NTUs. The Respondent's witnesses, however, operated a larger 21 foot boat at the location of the "T" shaped portion of the dock maneuvering it back and forth with a fairly large outboard motor in the 100 horsepower class, which might be presumed to be typical of the boats which will be using the proposed facility. The maneuvering of the boat with the larger engine in this shallow water created a clearly visible plume of turbidity shown by photographs introduced into evidence by the Respondent. In fact, however, although the turbidity plume was clearly visible, the Respondent's own direct measurement of turbidity taken from within the plume immediately after it was generated was 23.8 NTUs, still below the State standards for violations as to turbidity. The existing marina facility has a fuel dock and has adopted a fuel spill contingency plan. There will be no fueling of boats nor fuel kept at the proposed docks. Nevertheless, marinas were established to be a known source of discharge of oils and greases and the presence of more boats utilizing all the dock facilities, especially during fueling and maintenance procedures, will result in additional oils and greases being deposited in the water. Even if there is no fueling facility planned for the proposed docks, the additional boats represented by the 25 additional slips sought to be approved will have to be fueled and likely at the existing facility. This will heighten the risk of fuel, oil and grease spills. In this regard, it must be remembered that the present marina and the proposed docking facilities are in outstanding Florida waters in which no degradation of ambient water quality is permitted. In this context then, the Petitioner/Applicant has, not provided reasonable assurances that pollution levels for oils and greases will not increase as a result of the potential addition of 25 boats to this marina facility. A substantial issue has been raised in this proceeding concerning water quality as it relates to the bacteriological standard. It has been established that this marina is presently a source of discharge of fecal coliform organisms which frequently are present in sufficient concentrations so as to violate the standard for that organism for Class II waters. Fecal coliform bacteria are accumulated in the bodies of shellfish. The shellfish themselves are not harmed, but contaminated shellfish can accumulate concentrations of as much as 100 times the ambient fecal coliform bacterial levels present in the waters they inhabit. Fecal coliform bacteria can cause extreme illness in human beings, sometimes even paralysis and death. Fecal coliform bacteria in State waters results from the deposition therein of human or animal waste. The Petitioner maintains a sewage pumpout station located at its fuel dock with a direct connection to its sanitary upland sewer system, as well as a portable sewage pump that can be moved to each boat slip for pumping out of toilets or "heads" on boats. Upland fish cleaning stations will additionally be provided with the proposed docks so as to prevent refuse from fish cleaning activities being deposited into the waters of the cove. The fact remains, however, that there presently exist high levels of fecal coliform organisms in the waters of the cove at the marina site, in the above noted violative concentrations on repetitive occasions. The presence of boats moored in the marina with "heads" aboard are a known discharge source of fecal coliform organisms. The Petitioner proposes to restrict boats using the facility to those boats without marine heads aboard or requiring those with heads to keep them locked or otherwise not discharge them into the waters of the marina. If boats utilizing the marina have toilets aboard, however, there is a substantial likelihood that at some point those toilets will be discharged into the waters of the cove before any of the Petitioner's monitoring personnel are aware of it. The problem is thus one of enforcement. In this regard, it is established that even with the sewage pumpout station and the portable sewage pumpout device, that there are a number of "live-aboard" boats with marine heads in the marina at the present time and customarily. This has caused the above found violations of fecal coliform, Class II water standards. Although the Petitioner proposes to restrict boats at the proposed docking facility to those less than 25 feet in length and to establish a monitoring program by the marina management personnel to assure that the boats with heads only contain heads approved by Coast Guard regulation, reasonable assurances have still not been established that the enforcement plan proposed can be effective in ensuring that no marine heads or other sources of coliform bacteria will be discharged into the waters of the cove at the project site. The plan proposed by the Petitioner simply did not ensure that boats having marine heads will not use the marina and that those persons using boats so equipped will not, on some occasions, discharge the heads into the waters of the marina at the project site nor that spills will not result in the sewage pumping-out process. The Respondent's expert witness, Mr. Porter, confirmed that most fishing boats of the open "center console" variety of 25 feet length or less do not contain marine heads, nevertheless, he established that in his experience monitoring marinas of this sort, the restrictions against marine heads of the non-approved variety and the attempted restriction against boats discharging the contents of their heads into the waters of the marina cannot be effectively enforced nor was it established that fishing boats without marine heads will be the only type of boat to use the proposed docking facilities. Accordingly, the waters of the cove at the marina site and project site are in frequent violation of the fecal coliform and total coliform parameter for Class II waters and reasonable assurances have not been provided that the fecal coliform bacterial levels will not increase as a result of the installation and operation of the proposed facility with its attendant boats. Because of the likelihood of shellfish contamination by fecal coliform bacterial levels which will likely increase if the proposed project is constructed and operated, together with the loss of marine habitat and productivity posed by the harm likely to result to the seagrass beds in the vicinity of the proposed facility due to attendant boat operation, it has been shown that the water quality parameter for biological integrity in these Outstanding Florida Waters will likely be degraded. The "Diversity Index" of marine microinvertebrates in the area of the affected seagrass beds will likely be reduced below 75 percent of background levels. Therefore, in the context discussed above, the proposed construction and operation of the 25-slip marina facility with the "T" dock will lower ambient water quality in these outstanding Florida waters and will result in violations of State water quality standards for Class II waters in the above particulars. SHELLFISH HARVESTING Mr. William Porter of the Department of Natural Resources Bureau of Shellfish Sanitation established that the cove where the project would be located is closed to the taking of shellfish as a result of the contamination or potential for contamination of shellfish by coliform bacteria contained in fecal material. His Department's water quality sampling confirmed the elevated levels of fecal coliform bacteria in the cove on repetitive occasions. This elevated level of coliform organisms was shown to result from improper operation of marine toilets upon vessels using the marina at the present time. Because of the potential for contamination from vessels discharging fecal material, Mr. Porter established that the Department would likely close an area 50 percent larger than the present shellfish harvest closure area as a result of a 50 percent increase in the number of boats capable of using the marina if the proposed project is built. Mr. Porter acknowledges that if it could be assured that boats using the marina did not contain heads, the increased area of closure might be lessened after this project were built. He also established as pointed out above that such restrictions on boats containing heads from using the proposed boat slip is very difficult to enforce. Even with the present central sewage pumpout facilities and portable pumpout equipment at the existing marina, the marina still has failed to comply with fecal and total coliform standards for Class II waters on a repetitive basis. The management of the present marina has allowed live-aboard boats at the marina even though it has posted warning signs against boat owners discharging toilets in the cove waters. Mr. Porter also acknowledged that the Boca Grande North Marina, owned by Gasparilla Pass, Inc., was recently permitted by the DER and constructed and has not yet resulted in the Department's closing an additional area to the taking of shellfish. The area the marina is situated in, however, is only "conditionally approved" for the taking of shellfish, meaning that it is subject to closer monitoring by the DNR with a view toward the possible necessity of closing waters in the area of that marina. It was not established, however, how the fecal coliform or total coliform levels in the waters adjacent to that marina compare to the existing marina or the site of the proposed docking facilities at the existing marina, nor what conditions might prevail which would render that other marina a comparable site to -be used as a relevant demonstration of what conditions might be expected at the present marina if the proposed project were built and operated. Thus it has been shown that even though the Petitioner proposes limiting the size of boats at the proposed facility and closely inspecting and regulating any marine heads on boats using the facility to make sure they comply with Coast Guard regulations, it has not been demonstrated that the additional deposition of fecal coliform bacteria in the waters often the cove will be adequately prevented by the proposed enforcement measures. It is thus reasonably likely that the construction of the proposed project will lead to the closing of an additional area of water which is presently approved for shellfish harvesting. The closure of shellfish harvesting in waters is contrary to the public interest in terms of recreational values, fishing and marine productivity and others of the seven public interest criteria quoted below. Further, the contamination of shellfish, which can cause severe illness or even death in human beings, is clearly contrary to the public interest and there is a substantial likelihood that shellfish contamination is already occurring in the area due to the characteristic of shellfish by which they accumulate or store fecal coliform organisms to reach injurious levels for human consumption even though the shellfish themselves appear to be healthy. The area of the proposed project is extensively used for commercial and recreational shellfish harvesting at the present time, outside the immediate closed waters of the marina within the cove. PUBLIC INTEREST Section 403.918(2) (a) (1-7) requires that the Petitioner provide reasonable assurances that the proposed project will be clearly in the public interest. The public interest considerations of those seven criteria concern whether the project will adversely affect public health, safety or welfare or property of others: whether it will adversely affect conservation of fish and wildlife or their habitats; whether it will adversely affect the fishing or recreational values or marine productivity in the project vicinity; whether it will be of a temporary or permanent nature; and the effect on the current condition and relative value of functions reformed by areas affected by the project. Although Petitioner's witness, Dr. Roessler, related that the attached fouling communities, such as barnacles, which would form on the proposed docks and pilings would increase the diversity of marine habitat available, that will not offset the loss of marine habitat occasioned by the increasingly detrimental effect imposed by the project and the operation of it on the seagrass beds, in the manner discussed above. The fouling communities expected by Dr. Roessler to occur on the pilings to be installed, will not provide, nor replace the value of, the detritus (seeds and leaves) produced by the seagrass which would be lost, which is an important food source for marine organisms in the upper portion of the food chain in the area, some of which organisms include fish and have a high recreational value and commercial value. The importance of detrital production by the seagrass beds outweigh the value of the addition of the fouling communities on the pilings. In fact, the total diversity of marine species actually might decline even though the fouling organisms would be added with the installation of the pilings, once the harmful effects on the seagrass beds begin to occur after installation and operation of the proposed facility and over the life of the marina. Thus, in this regard, the project is contrary to the public interest and certainly not clearly in the public interest. Additionally, there is a substantial likelihood that shellfish may be contaminated which, in turn, will have an adverse effect on the public health, safety and welfare. The harvesting of shellfish has a substantial recreational and commercial value and is an important aspect of the marine productivity in the vicinity of the project. The heightened coliform bacteria production caused by the resultant expansion of the marina will adversely affect fishing and recreational values and marine productivity and will degrade the current condition and relative values of the functions performed by the marine habitat in the vicinity of the proposed dock. Finally, there is no question that the project will be of a permanent nature. The various detrimental effects on the public interest consideration found herein are rendered more critical by the fact that there is no truly redeeming public purpose or use for this project. This will be essentially a private docking facility designed to serve the residents of the applicant's attendant real estate development. The upland development is a condominium development and the slips will be owned by the condominium owners and not open to the general public, although the Petitioner did make vague reference to an idea that some slips might be rented to members of the public. This was not established to be the case and, in any event, the primary purpose of the boat slips is to enhance the desirability of the upland development. Although the Petitioner emphasizes that the advent of the additional slips might help attract as much as $1,000,000 additional revenue to the Boca Grande area by assisting the applicant in hosting the Annual Tarpon Release Fishing Tournament, it is also true that any development in a coastal area will likely represent some economic benefit to that area, but there is also a substantial economic and recreational benefit to maintaining the outstanding Florida waters involved in an undegraded condition and maintaining the present Class II, approved shellfish harvesting area unimpaired. Thus, although the proposed docks might be used for sponsorship of the subject fishing tournament and it can be said that that would enhance fishing and recreational value to some extent, it was not established that the tournament will not occur and that the extra revenue and enhancement of fishing and recreational value it will generate will not occur in the Boca Grande area anyway. The potential detrimental effects of the proposed project, delineated above, will also decrease fishing and recreational value over many years and for the life of this project in terms of harm to the marine habitat occasioned by the constant deposition of oils, greases and fuel and coliform bacteria in the Class II waters involved, as well as the other detrimental aspects of the project discussed above. It has not been established that the economic benefits of the fishing tournament and the addition of the boat slips will not occur but for the installation of this proposed docking facility. Although it may help relieve a shortage of marina slips in the area, it was not shown that this is the only alternative to relief of that shortage. ALTERATION OF MANGROVES The original site for the access ramp or walkway to the "T" shaped portion of the dock was selected through an on site inspection conducted in part by Respondent's witness, Andrew Barth. The mangrove area is less dense at the site of the walkway's penetration of the mangrove belt than surrounding mangrove areas. Petitioner's witness, Dr. Roessler, has participated in many studies involving mangroves in South Florida. He identified each tree within the proposed dock pathway. Through narrowing of the dock walkway to five feet and the relocation agreed upon by the Petitioner and Mr. Barth, it has been established that only three mangrove trees will be removed by the construction of the dock. Thus, there will be no substantial alteration or degradation of the mangrove fringe area at the project site. DOCK CONSTRUCTION Mr. C. W. Sheffield was accepted as an expert witness in the field of marine engineering. He established that the pilings will be installed using a 6 to 8 inch chisel point driven into the bottom of the sound with an air hammer. There will be no augering or other means of excavation used which would generate a substantial amount of turbidity. The air hammer will result in compaction of sediments by forces radiating out from the piling as it is driven, with the counteracting sheer force caused by the piling installation causing a slight bulging in the bottom around each piling, but nothing more. There will be no significant movement of sediment in the water column. The construction of the dock will take place moving from the land waterward, utilizing equipment mounted on the dock. Thus, construction barges will not be required to come into the shallow grass bed area with the potential for its damage. Small barges would be used in the deeper waterward portions of the project to install the mooring pilings off-shore from the end of the "T" dock. Turbidity curtains will be used during all construction, surrounding all phases of the construction work. In Mr. Sheffield's experience, such measures have resulted in no violation of the State turbidity standards at other similar projects, and are not likely to with this one. CUMULATIVE IMPACT A number of permits have been issued by the Department for docking facilities to the north of this proposal and other facilities are already in existence. Dr. Roessler opined that the geographic location of these, as well as that of this project, in light of the numerous inlets and high degree of tidal flushing and exchange through the inlets, will not result in any adverse cumulative impact occasioned by the addition of the proposed dock with 25 slips to those already existing in the Sound. It is noteworthy that, with regard to the potential this project poses for damage to the seagrass beds and for heightened production of fecal coliform bacteria, with the environmental damage attendant thereto, no proof was offered by either party concerning those considerations or effects to the extent that they might or might not exist at other marinas or docking facilities in the Gasparilla Sound area. There has been no proof to establish any cumulative impact.

Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the testimony and evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is, therefore RECOMMENDED that a Final Order be entered denying the subject permit application, except for that portion seeking authorization for the "L" shaped dock and six boat slips attendant thereto, which should be granted with the agreed-upon conditions and restrictions contained in the above Findings of Fact. DONE and ENTERED this 19th day of December, 1986 in Tallahassee, Florida. P. MICHAEL RUFF, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of December, 1986. APPENDIX Petitioner's Proposed Findings of Fact: The rulings on the Petitioner's Proposed Findings of Fact are numbered below in the order in which they were presented (unnumbered) by the Petitioner. 1-6. Accepted Accepted, excepted for the last two sentences which are immaterial Accepted. Accepted, except as to the proffered material import of the last sentence. Accepted, except the first sentence which is not in accord with the greater weight of the evidence. Accepted, except as to the last three sentences which are not supported by preponderant evidence 12-16. Accepted. Rejected, as not in accordance with the preponderant evidence of record. Rejected as not being in accordance with the greater weight of the evidence. Accepted, but not as dispositive of any material issue presented. Accepted, except as to the last sentence which is rejected as being contrary to the preponderant evidence adduced. Accepted, except as to the third and last sentences which are rejected as being contrary to the preponderant evidence adduced. Accepted, except for the third and last two sentences which are rejected as to their purported import in the resolution of the material issues presented and as being not in accordance with the preponderant evidence adduced. Accepted. Accepted, but not as dispositive of the jurisdictional issue concerning "dredging and filling" for the reasons found in the Recommended Order. Accepted. Accepted. Respondent's Proposed Findings of Fact: 1-18. Accepted 19. Accepted, but not dispositive of any material issue presented. 20-25. Accepted. Rejected as not being a complete finding of fact. Accepted. Accepted, except as to the issue of water dept which would actually be less at the critical location involved. Accepted. Accepted, but not material. 31-31. Accepted. 35. Accepted, but not truly material in this de novo proceeding. COPIES FURNISHED: Robert A. Routa, Esquire 217 South Adams Street Tallahassee, Florida 32302-1386 Bradford L. Thomas, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Victoria Tschinkel, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Mary F. Smallwood, Esquire General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Stephen Fox, Director Division of Environmental Permitting Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 ================================================================ =

Florida Laws (6) 120.57120.68258.392267.061403.061403.087
# 2
SRQUS, LLC vs CITY OF SARASOTA AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 12-002161 (2012)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Jun. 19, 2012 Number: 12-002161 Latest Update: Oct. 10, 2019

The Issue The issue is whether reasonable assurance has been provided by Sarasota County (County) for the issuance of Environmental Resource Permit (ERP) No. 44040881.000 authorizing the proposed alteration of a drainage ditch in the City of Sarasota (City), and whether Petitioner, SRQUS, LLC, was entitled to receive notice of the application pursuant to Florida Administrative Code Rule 40D-1.603(9)(a) and (b).

Findings Of Fact Parties Petitioner is a Florida limited liability corporation established in 2010 whose only members are Erika and Achim Ginsberg-Klemmt. In 2010, Petitioner purchased parcel 2009-16- 0015 in a tax deed sale. The parcel consists primarily of the submerged lands within the marina basin adjacent to the project area. Petitioner contends that the tax deed accords it ownership of the western most 130 feet of the existing ditch and that the County is not authorized to do work on that property. The City and County dispute this claim and it is now being litigated in circuit court. The City claims ownership or control of all of the project area to be addressed under the permit. The City authorized the County to apply for and construct the improvements authorized by the permit pursuant to an interlocal agreement with the County for consolidation of stormwater management responsibilities. The District is the agency charged with the responsibility of controlling water resources within its geographic boundaries and to administer and enforce chapter 373 and the rules promulgated in rule division 40D. The County submitted the application pursuant to an interlocal agreement with the City and will construct, operate, and maintain the project if the permit is issued. The Project U.S. Highway 41, also known as Tamiami Trail, travels through downtown Sarasota. During rainy months, between Fruitville Road and Second Street, U.S. Highway 41 experiences frequent roadway flooding. At the area where U.S. Highway 41 floods and between the Quay development to the north and the Ritz-Carlton Hotel to the south, is a stormwater ditch that drains west into a marina basin or bayou adjoining Sarasota Bay. However, it does not directly discharge into Sarasota Bay. The ditch is an upland cut drainage ditch approximately 650 feet in length and has been in existence for decades. The ditch is covered under a National Pollutant Discharge Elimination System (NPDES) Municipal Separate Stormwater Sewer System (MS4) permit issued to the County for the surrounding communities. Contaminants in the stormwater system are addressed under this permit. The ditch provides the only outfall for an approximately 46-acre heavily urbanized drainage basin for which stormwater is collected through the stormwater system. The stormwater is discharged into the drainage ditch through a double concrete box culvert under U.S. Highway 41 and is ultimately conveyed to a marina basin adjoining Sarasota Bay. The ditch is located in what was originally platted as the right-of-way for Eighth Street (now known as Second Street) on the Central Broadway subdivision plat within the City. Pursuant to an earlier exemption determination by the District, in 2004 the County conducted maintenance dredging on the easterly portion of the drainage ditch in an effort to remove the sediments and vegetation that had built up in the ditch over the years and reduced its flow. Since that time, the ditch has again filled in as a result of the significant amounts of sedimentation from stormwater flows entering and settling in the ditch and significant amounts of vegetation. Also, flooding on U.S. Highway 41 has become more frequent. In its current condition, the ditch is approximately eight to 12 feet wide and eight to 12 inches deep, is poorly drained due to the sedimentation and heavily overgrown mangroves and nuisance vegetation, and is tidally influenced. Accumulated sediments in the ditch are approximately four feet thick at the eastern end and become thinner at the western end of the ditch. In August 2009, staff from the City, County, District, and Florida Department of Transportation met at the site of the ditch to conduct a pre-application meeting and discuss possible ways of addressing flooding problems at this location. Aside from the ditch improvements being proposed by the County, the only other remedy is to pipe the ditch, which is cost-prohibitive and would defeat the County's goal of keeping as much desirable vegetation in place as possible. To address flooding and maintenance concerns, on September 8, 2011, the County submitted an ERP application to the District to seek authorization to dredge and undertake ditch improvements. The application identifies the ditch as being within City right-of-way. Included with the application was a letter from the City authorizing the County to apply for the ERP on behalf of the City pursuant to their interlocal stormwater agreement. At the time the application was filed, the County Property Appraiser's Office Geographic Information Systems tax parcel map showed the ditch and dredge area as being within the City right-of-way. The proposed project consists of reconstruction of the ditch with a defined channel to be lined with rip rap and geotextile fabric and the addition of two sediment sump boxes. Some of the mangroves and nuisance vegetation will be removed as necessary to construct the ditch improvements. Mangroves will be preserved where not impacted by construction. The Property Dispute Petitioner claims ownership of the western 130 feet of the right-of-way in which the ditch is located. As noted above, at the time the permit application was submitted, official property records showed the existing ditch as located within City right-of-way. Therefore, the County and District had no reason to doubt City ownership or control of the ditch area. A recently filed circuit court action seeks to determine ownership of a portion of the right-of-way in which the ditch is located. The circuit court has exclusive jurisdiction over all actions involving the titles and boundaries or right of possession of real property. District rules permit applicants to demonstrate sufficient ownership or legal control of the proposed project area in order to conduct the activities to be permitted. An applicant with eminent domain authority that does not have ownership or control for all property necessary for the proposed project may rely on its eminent domain authority to demonstrate sufficient ownership or legal control of the property necessary to construct the project. The permit will be conditioned to prohibit construction until all ownership or legal control of the property necessary to construct the project is acquired by the permittee. See Fla. Admin. Code R. 40D-4.301(1)(j); BOR § 2.0. The proposed permit contains Specific Condition No. 8 which enforces this requirement. Reasonable assurance of sufficient ownership or legal control of the project area is provided by virtue of the City's and County's eminent domain authority and the fact that the proposed permit prohibits construction until the permittee acquires all necessary ownership or other legal control of the property necessary to construct the project. Notice Requirements Petitioner contends the permit should be denied because it did not receive notice of the application pursuant to rule 40D-1.603(9). That rule provides that when the applicant is an entity with the power of eminent domain that does not have current ownership or control of the entire project area as described in the application, the applicant shall provide the property owner(s) identified in the application with so-called eminent domain noticing, which consists of (a) written notice of District receipt of the application, and (b) written notice of agency action on the application. Persons entitled to eminent domain noticing are owners of property located within the proposed project area as identified in the county property appraiser's records within 30 days prior to the filing of the application. The purpose of the District's eminent domain noticing provision is to provide notice and an opportunity to be heard to owners of property subject to being condemned or otherwise acquired by the applicant for part of the project area. As originally submitted, the application proposed some activities extending approximately ten feet into the marina basin and beyond the claimed City right-of-way. The permit application did not indicate City ownership or control of submerged lands within the marina basin. Consequently, in its request for additional information (RAI), the District advised that pursuant to rule 40D-1.603(9)(a) and (b), eminent domain notices to affected landowners would be required for any proposed easements over offsite property. As part of the application process, a seagrass study was prepared which showed seagrasses and oyster beds growing in the marina basin just beyond the end of the ditch, where some construction activity was proposed. Because seagrasses were observed growing at the end of the ditch, the County responded to the RAI by scaling back the project to confine activities to the City's right-of-way. With the change in project area, offsite easements were no longer necessary for the project. Thus, the project no longer required eminent domain noticing pursuant to rule 40D-1.603(9). The County and District acknowledge that Petitioner did not receive eminent domain notices. Although not provided notice, Petitioner nevertheless became aware of the permit application during the course of its own application process with the Department of Environmental Protection (DEP) for an ERP to construct a 4,760-square foot, ten-slip docking facility on its adjacent submerged lands in the marina basin. The lack of notice has not prevented Petitioner from challenging the project or has otherwise prejudiced it. Having received actual notice of the permit, Petitioner filed a timely objection and request for hearing in this matter. Petitioner contends that while it does not oppose the ditch dredging, it would have wanted an opportunity to suggest a re-design of the ditch to include a dingy dock and kayak launching facility. Although it has known of the project since at least May 21, 2012, when it filed its first petition, and probably several months earlier, Petitioner has not provided the County or District with any alternative designs to maximize the potential for recreational use of the drainage canal. There is no requirement for ERP applicants to provide alternative designs to maximize potential public recreational uses. Requiring the County to do so would impose requirements that go beyond the conditions for permit issuance. ERP Permitting Criteria To obtain an ERP, a permit applicant must provide reasonable assurance that the proposed activities will not cause adverse impacts to water quality, water quantity, and other environmental resources. For activities proposed in, on, or over wetlands and other surface waters, reasonable assurance must also be provided that such activities are not contrary to the public interest and do not cause unacceptable cumulative impacts upon wetlands and other surface waters. The conditions for issuance of an ERP are set forth in rules 40D-4.301 and 40D-4.302. The standards and criteria in the BOR are used to determine whether an applicant has met the conditions for issuance in those two rules. The parties have stipulated that the project either complies with the following conditions for issuance or that they are not applicable: 40D-4.301(1)(b), (c), (g), (h), (j), and (k) and 40D-4.302(1)(a)6. Also, rule 40D-4.302(1)(c) and (d), which concerns projects located in, adjacent to, or in close proximity to certain shellfish harvesting waters or which involve vertical seawalls, is not applicable to this matter. Based on the parties' Stipulation, at issue is whether reasonable assurance has been provided that the proposed activities will not cause adverse water quantity impacts to receiving waters and adjacent lands (40D-4.301(1)(a)); will not adversely impact the value of functions provided to fish and wildlife by wetlands and other surface waters (40D-4.301(1)(d)); will not adversely affect the quality of receiving waters such that applicable state water quality standards will be violated (40D-4.301(1)(e)); and will not cause adverse secondary impacts to the water resources (40D-4.301(1)(f)). Petitioner also contends that the County has failed to give reasonable assurance that the project is not contrary to the public interest and that it will not cause unacceptable cumulative impacts, as required by rule 40D-4.302(1)(a) and (b). Water Quantity Impacts Rule 40D-4.301(1)(a) requires reasonable assurance be provided that the project will not cause adverse water quantity impacts to receiving waters and adjacent lands. Existing and post-construction flows were modeled by the County using the accepted Inter-Connected Pond Routing model. Drainage calculations demonstrate that for the 25-year storm, the flood stage will be reduced by 1.94 feet, and for the 100-year storm event, by 1.75 feet, which will provide flood relief. Modeling results demonstrate a reduction in flood stages not just for U.S. Highway 41 but for other adjoining properties. The evidence establishes that while the project is not designed to eliminate all potential flooding, flooding during normal events will be reduced. Specifically, no adverse water quantity impacts were demonstrated with respect to Petitioner's adjacent submerged lands. Improvements proposed to the ditch will increase its storage capacity and allow water to flow more efficiently. By increasing the storage and hydraulic efficiency of the ditch without generating any additional runoff volume, the proposed activities will not cause adverse water quantity impacts and will have no adverse water quantity impacts on the receiving waters. Reasonable assurance has been demonstrated that the project will not cause adverse water quantity impacts to receiving waters or adjacent lands and will not cause adverse flooding to on-site or off-site property, including adjacent submerged lands owned by Petitioner. Impact on Value of Functions Rule 40D-4.301(1)(d) requires that reasonable assurance be provided that project activities "will not adversely impact the value of functions provided to fish and wildlife, and listed species including aquatic and wetland dependent species, by wetlands, other surface waters and other water related resources of the District." The existing ditch provides limited ecological functions for fish and wildlife, as it contains significant levels of exotics and nuisance vegetation that provide little in the way of habitat. The removal of the nuisance vegetation, improved water circulation, and decreased sediments will be an improvement. The proposed ditch reconstruction and replanting with other vegetation will provide a more suitable habitat for younger life stages of fish such as sea trout, red fish, and hog chokers, which are species typically found in tidally influenced drainage systems. Overall, the proposed project will result in an improved habitat available for fish and wildlife. The project will retain as many of the existing mangroves as possible, thereby retaining the ecology of the mangrove wetlands. Reasonable assurance has been provided that the project will not adversely impact the value of functions being provided to fish and wildlife and will actually improve the ecological functions provided by the ditch. Quality of Receiving Waters Rule 40D-4.301(1)(e) requires that reasonable assurance be provided that the proposed ditch alterations will not adversely affect the quality of receiving waters such that water quality standards will be violated. The parties have stipulated that the project will not violate water quality standards set forth in rule chapters 62-522 and 62-550. Petitioner contends, however, that reasonable assurance has not been provided concerning possible impacts relating to surface water quality standards in rule chapter 62-302, the anti- degradation provisions of rule chapter 62-4, or the groundwater permitting and monitoring requirements of rule chapter 62-522. No evidence was presented by Petitioner that the activities will adversely affect the groundwater protection provisions of rule chapter 62-522. The proposed ditch alterations do not involve activities relating to these state water quality standards. Under BOR section 3.2.4, reasonable assurance must be provided for the short term and the long term that water quality standards are not violated. As to potential construction or short-term impacts, the proposed construction work involves the removal of sediments accumulated in the ditch, reconstruction of the ditch to be wider and deeper and within a more defined course, the addition of rip rap and geotextile fabric on the ditch bottom, and replanting of the ditch banks with salt- tolerant grasses and other vegetation to provide soil stabilization and erosion control. The proposed permit addresses the potential for turbidity during construction activities to cause short-term water quality violations by authorizing a temporary mixing zone and by requiring the installation of turbidity barriers and ongoing turbidity monitoring during construction. To further minimize the potential for any water quality violation during construction activities, construction methods will include the use of cofferdams or similar techniques to provide a barrier between the open water of the marina basin and the work being constructed within the ditch, which will be undertaken in segments starting at the eastern outfall at U.S. Highway 41. These provisions adequately address the potential for any short- term water quality impacts and are consistent with BOR provisions relating to short-term water quality. As to possible long-term water quality impacts, the evidence establishes that the proposed activities will not add any additional pollutants or new pollutant source to the receiving waters and will not cause or contribute to any violation of water quality standards. To the contrary, by removing existing stormwater sediments, which are known to contain pollutants, controlling sedimentation through collection of sediments in sediment sumps, and armoring the ditch channel to prevent erosion, water quality is expected to improve. The proposed sediment sumps to be added as a best management practice are appropriately sized to handle the approximately 5,600 pounds of sediments that accumulate annually in the ditch, as determined by annual pollutant load calculations provided by the County. The sumps will be located most efficiently at the outfall where the ditch begins. Preventing sediments from entering the receiving waters is one of the best things that can be done to improve water quality in nearby Sarasota Bay. Improvements in water quality are also expected to occur as a result of the addition of rip rap that will dissipate the flow energy, thereby allowing any remaining sediments to settle down, and the geotextile fabric that will keep soil in place and not allow it to float up. The sodding and replanting of the ditch embankments will also prevent side erosion from occurring, which erosion could add sediments in the ditch. Once constructed, the ditch will be regularly maintained by the County, with sediments to be cleaned out of the sump on a quarterly schedule. Any sediments settling on the rip rap and on plant vegetation would be cleaned out as needed, as determined by regular inspections. Petitioner contends that reasonable assurance has not been provided to show that water quality standards in rule chapter 62-302, and the anti-degradation provisions of rule chapter 62-4, will not be violated by the proposed activities. Its expert opined that the impact of the proposed activity on state water quality standards cannot be determined because no sampling of the receiving water was conducted, the permit does not require compliance monitoring, and the existing ditch sediments were not sufficiently analyzed. The evidence establishes that it can be reasonably presumed, without compliance monitoring or sampling, that the water flowing from the 46-acre urbanized watershed served by the ditch contains sediments and other pollutants typically associated with urban runoff. Most of the expected pollutants are contained within, or settle into the sediments that are deposited into, the ditch. By removing sediments through the use of adequately sized sediment sumps, slowing the water down to allow suspended solids to settle out within the ditch, adding geotextile fabric and rip rap covering the ditch bottom, establishing vegetation on the ditch sidebanks to prevent erosion, and implementing periodic maintenance through vacuum removal of collected sediments, the proposed activities will remove pollutants from the water flowing into the ditch and discharging into the marina basin and ultimately entering Sarasota Bay. Thus, it is reasonable to expect without sampling or monitoring that the proposed activities will improve water quality. In addition to identifying the positive benefits of the proposed activities, the evidence established that the proposed activities will not add a pollutant source to the receiving waters. This was not credibly disputed by Petitioner. Because the project does not generate pollutants, the proposed activities will not cause or contribute to a violation of state water quality standards. There is no reason to require pre-construction or baseline sampling to compare with post- construction sampling, as no pollutants will be generated. The removal of sediments and ongoing ditch maintenance will result in an improvement in water quality. Therefore, it can be reasonably assured without requiring sampling or monitoring that the activities will not result in any violations of state water quality standards. Secondary Impacts Rule 40D-4.301(1)(f) and BOR section 3.2.7 require that an applicant provide reasonable assurance that a regulated activity will not cause adverse secondary impacts to the water resource. As originally proposed, the project included activities extending beyond the end of the ditch and into the marina basin, where seagrasses and oyster beds are present. By avoiding impacts to these resources, the project also avoids any secondary impacts to manatees that may frequent Sarasota Bay. Turbidity control measures to be used during construction will also avoid secondary impacts to these resources. Petitioner provided no evidence that secondary impacts would occur as a result of the project. Reasonable assurance has been provided that the proposed activities will not result in any secondary impacts to the water resources. Public Interest Test Rule 40D-4.302(1)(a) requires an applicant to provide reasonable assurance that activities to be located in, on, or over wetlands and other surface waters will not be contrary to the public interest, as determined by balancing certain criteria, or if such activity significantly degrades or is within an Outstanding Florida Water (OFW), that the activity will be clearly in the public interest. The proposed activities are not located within Sarasota Bay, a designated OFW. Petitioner provided no evidence that the proposed activities would significantly degrade that body of water. Therefore, the County need only demonstrate that the proposed activities are not contrary to the public interest. The parties have stipulated that rule 40D- 4.302(1)(a)6., which governs historical and archaeological resources, is not applicable to this matter. The remaining criteria at issue are whether the activity will adversely affect the public health, safety, or welfare or the property of others; whether the activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; whether the activity will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; whether the activity will adversely affect the fishing or recreational values of marine productivity in the vicinity of the activity; whether the activity will be of a temporary or permanent nature; and the current condition and relative value of functions being performed by areas affected by the proposed activity. The evidence establishes that the project will reduce flooding during normal stages and remove sediments. By reducing the potential for roadway flooding and improving water quality through sediment reduction, the project will have a beneficial impact on public health, safety, and welfare, and will not adversely affect the property of others. Efforts were made to reduce or eliminate impacts to wetlands and other surface waters in the design of the project. Proposed activities will involve the removal of some of the existing mangroves. Based upon an analysis conducted pursuant to the Uniform Mitigation Assessment Manual, the unavoidable impacts to wetlands and other surface waters will result in a functional loss score of 0.08. Unavoidable wetland and other surface water impacts anticipated from the project will be appropriately mitigated through the use of a 0.08 credit from the Curry Creek Regional Offsite Mitigation Area (ROMA). The evidence demonstrates that the project will not adversely affect the value of functions provided by wetlands and other surface waters to conservation of fish and wildlife, including any endangered or threatened species, or their habitats and will actually result in an improvement in wetland and other surface water functions and habitat. The evidence establishes that the proposed activities will not adversely impact navigation or the flow of water and will not cause erosion or shoaling. The ditch reconstruction will prevent the possibility of shoaling at the downstream end of the ditch adjoining Petitioner's submerged lands by increasing the width of the ditch, slowing the water down, removing sedimentation along the ditch bottom, and reducing erosion through the planting of salt-tolerant sod and other vegetation along the ditch side banks. Petitioner presented no contrary evidence. No adverse impacts are expected to occur with respect to fishing or recreational values or marine productivity in the vicinity of the proposed activity. By removing sediments, the project will provide an improvement to fishing and recreational activities in the marina basin and Sarasota Bay. Petitioner raised concerns regarding the amount of floatable material that will be discharged from the ditch as a result of removal of mangroves. As provided in the permit plans, significant portions of the mangroves will remain undisturbed. Under current conditions, the ditch and mangroves do not prevent or trap all trash and floatables entering the ditch. On-site observations of existing conditions confirmed there is not a large amount of trash and floatables currently being retained by existing mangroves. Any temporarily retained floatables within the ditch area ultimately float out to Sarasota Bay with the tide. The evidence establishes that even with the removal of some mangroves, the project is not expected to result in an easier flow or increased amount of floatables entering the marina basin. Finally, because the project activities do not add floatable materials to the ditch, requiring the County to implement design changes to remove floatables would exceed what is necessary to meet the conditions for permit issuance. Petitioner also raised concerns regarding the levels of fecal coliform and the possibility of illicit connections to the stormwater collection outfalls to the ditch. The ditch is part of a MS4 permit that is regulated pursuant to NPDES Permit No. FLS000004 issued to the County. The NPDES permit governs stormwater discharges within the unincorporated portions of the County, the municipalities within the County, and that part of Longboat Key that is in Manatee County. The primary function of the MS4 permit is to address issues of water quality as they relate to stormwater discharges. The MS4 permit requirements would be the appropriate regulatory framework to address elevated fecal coliform, illicit connections, or other water quality concerns in the stormwater emanating from the drainage basin served by the ditch, and not the ERP regulatory program. Having weighed and balanced the six applicable criteria, and based upon the evidence presented, the County has provided reasonable assurance that the proposed activities will not be contrary to the public interest. Cumulative Impacts Rule 40D-4.302(1)(b) requires an applicant to demonstrate that the proposed activities will not cause unacceptable cumulative impacts on wetlands and other surface waters, as further described in BOR sections 3.2.8 through 3.2.8.2. BOR section 3.2.8 provides that if an applicant proposes to mitigate any adverse impacts within the same drainage basin as the impacts, and if the mitigation fully offsets those impacts, then the regulated activity is considered to have no unacceptable cumulative impacts upon wetlands and other surface waters. Mitigation for unavoidable wetland impacts upon wetlands will be provided through the use of the 0.08 credit from the Curry Creek ROMA. The evidence establishes that the proposed mitigation fully offsets the impacts and is within the same drainage basin as the proposed impacts. No adverse cumulative impacts will occur with the project. Petitioner presented no contrary evidence of adverse cumulative impacts. Impaired Receiving Waters Petitioner contends that the project does not comply with the requirements of rule 40D-4.301(2) and related BOR section 3.2.4.5, which are applicable when existing ambient water quality does not meet state water quality standards. Rule 40D-4.301(2) provides that if an applicant is unable to meet water quality standards because existing ambient water quality does not meet standards, the applicant shall meet the requirements of BOR section 3.2.4.5 and related sections cited in that provision. Together, these provisions require that where existing ambient water quality does not meet standards, the applicant must demonstrate that for the parameters that do not meet water quality standards, the proposed activity will not contribute to the existing violation. If it does contribute to the existing violation, mitigation measures will be required that result in a net improvement of the water quality in the receiving waters for the parameter that does not meet standards. The marina basin that is the receiving waters for the ditch has been identified by DEP as impaired due to levels of mercury in fish tissue. The evidence demonstrates that the project will not contribute to this water quality violation. Although not required to implement mitigation measures that will cause a net improvement of the levels of mercury in fish tissue, the evidence establishes that to the extent existing sediments contain mercury deposits, removal of the sediments reduce a source of mercury that can be ingested by fish in the receiving waters. Water Quality Certification Petitioner contends that Specific Condition No. 9 of the proposed permit, which expressly waives certification of compliance with state water quality standards, is contrary to Section 401 of the Clean Water Act, 33 U.S.C. § 1341, and inconsistent with the legislative declaration of policy set forth in section 373.016(3)(f) and (j). As explained by unrefuted testimony of the District, the water quality certification provisions of Section 401 allow states an opportunity to address the water resource impacts of federally issued permits and licenses. Under Section 401, a federal agency cannot issue a permit or license for an activity that may result in a discharge to waters of the United States unless the affected state has granted or waived Section 401 certification. A state may grant, deny, or waive certification. Granting certification allows the federal permit or license to be issued. Denying certification prohibits the federal permit or license from being issued. Waiving certification allows the permit or license to be issued without state comment. Pursuant to rule 40D-4.101(4), an application for an ERP shall also constitute an application for certification of compliance with state water quality standards where necessary pursuant to Section 401. Issuance of the permit constitutes certification of compliance with water quality standards unless the permit is issued pursuant to the net improvement provision of section 373.414(1), or the permit specifically states otherwise. By letter dated February 2, 1998, to the United States Environmental Protection Agency, DEP has delegated to the state's five water management districts the authority to issue, deny, or waive water quality certifications under Section 401. DEP has also established categories of activities for which water quality certification will be considered waived. Under the DEP delegation, water management districts may waive water quality certification for four situations, one of which is when the permit or authorization expressly so provides. This is still current DEP direction. The types of permitting decisions which constitute the granting of water quality certification and the types of activities for which water quality certification could be considered waived are also addressed in the current Operating Agreement between the United States Army Corps of Engineers (USACE), DEP, and the five water management districts. According to both DEP guidance and the water management district agreement with the USACE, water quality certification will be considered waived when the permit or authorization expressly so states. The District most often expressly waives water quality certification for permits issued pursuant to the net improvement provisions and for projects that discharge into impaired waters. Proposed Specific Condition No. 9 of the permit expressly waives water quality certification due to the fact that the receiving waters are listed by DEP as impaired. Conditioning of the permit in this manner is consistent with DEP guidance and District practice under these circumstances. Although water quality certification for federal permitting review purposes is waived, the project must still comply with water quality requirements by demonstrating that the proposed activities do not cause or contribute to a violation of state water quality standards or if the activities contribute to an existing violation, that a net benefit is provided. The evidence establishes that the project will not cause or contribute to a violation of water quality standards and is not expected to contribute to the receiving water impairment of elevated mercury levels in fish tissue. While not required, the project is nevertheless expected to have a positive benefit on overall water quality and likely will reduce mercury levels in fish tissue by removing the sediments that contain metals such as mercury. The District's waiver of water quality certification is consistent with Section 401, the legislative declaration of policy set forth in section 373.016(3)(f) and (j), and applicable regulatory practices for Clean Water Act water quality certification.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order approving the issuance of ERP No. 44040881.000 to the City and County, as joint permittees. DONE AND ENTERED this 7th day of May, 2013, in Tallahassee, Leon County, Florida. S D. R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 7th day of May 2013. COPIES FURNISHED: Blake C. Guillery, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899 Erika Ginsberg-Klemmt SRQUS, LLC 3364 Tanglewood Drive Sarasota, Florida 34239-6515 Achim Ginsberg-Klemmt SRQUS, LLC 3364 Tanglewood Drive Sarasota, Florida 34239-6515 Martha A. Moore, Esquire Southwest Florida Water Management District 7601 Highway 301 North Tampa, Florida 33637-6758 Alan W. Roddy, Esquire Office of the County Attorney 1660 Ringling Boulevard, Second Floor Sarasota, Florida 34236-6808 Michael A. Connolly, Esquire Fournier, Connolly, Warren & Shamsey, P.A. One South School Avenue, Suite 700 Sarasota, Florida 34237-6014

USC (2) 33 U.S.C 1333 U.S.C 1341 Florida Laws (7) 120.569120.57120.6826.012373.016373.414373.421 Florida Administrative Code (3) 40D-4.30140D-4.30240D-4.351
# 3
WILLIAM A. BARRINGER, IRVIN C. DEGELLER, CARL H. PFORZHEIMER, AND A. CLARK RAYNOR vs E. SPEER AND ASSOCIATES, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-002900 (1991)
Division of Administrative Hearings, Florida Filed:Stuart, Florida May 10, 1991 Number: 91-002900 Latest Update: Aug. 12, 1992

The Issue The issue for determination in this proceeding is whether Respondent, E. Speer and Associates, Inc. (the "Applicant"), should be granted a permit for the construction of a permanent docking facility pursuant to Sections 403.91-403.929, Florida Statutes, and Florida Administrative Code Chapter 17.

Findings Of Fact Whether Quantified Hydrographic Studies Are Necessary For All Marina Applications To Provide Reasonable Assurance That Flushing Is Adequate To Prevent Violations of Water Quality Standards Speer's Exceptions Nos. 1, 4, 5, 6, 7 and 8 in whole or in part take exception to the Hearing Officer's conclusion (stated as a finding of fact) that it is not possible to demonstrate adequate flushing without "quantifying flushing rates and pollutant dispersal rates using objective methods and appropriate hydrodynamic data." (R.O. at 20, 22-24, 47, 49-50, 54, 57-58; F.O.F. Nos. 33, 35, 38-39, 40, 43-45, 64, 66, and 69) It is clear from the tenor of the entire recommended order that the Hearing Officer believes that as a matter of law an expert's opinion is not sufficient to provide reasonable assurances that flushing will be adequate to prevent violations of water quality standards unless that opinion is based on quantified conclusions generated by objective methods and appropriate hydrodynamic data. (R.O. at 47, 49-50, 57-58) Thus, for example, the Hearing Officer opines that quantification of flushing rates and pollutant dispersal rates using objective measurements of appropriate hydrodynamic data is an essential element of the prima facie showing required to be made by the applicant. (R.O. at 47; C.O.L. No. 11) The Hearing Officer places great significance an the following excerpt from the opinion in 1800 Atlantic Developers v. Department of Environmental Reculation, 552 So.2d 946 (Fla. 1st DCA 1989), rev. den., 562 So.2d 345 (Fla. 1990): 1800 Atlantic filed 34 exceptions to the recommended order, most of which were denied in the Department's final order . . . . The final order approved and adopted most of the findings of fact and conclusions of law in the recommended order and denied the permit. The following stated rulings and reasons there for are significant to the issues on this appeal. (emphasis added) We must note at this point that there is no finding of fact in the hearing officer's recommended order that quantifies how productive the marine habitat may be in this case, and no record support for the suggestion that there would be some quantifiable diminution in the quality of the marine habitat attributable to this project [footnote omitted]. (emphasis added) Exception 23 filed by 1800 Atlantic challenged the hearing officer's finding that the project will adversely affect the conservation of fish and wildlife, fishing or recreational values, and marine productivity in the vicinity . . . The Department rejected this exception based upon the hearing officer's general statements, without any quantification whatsoever, of adverse effects upon these matters . . . (emphasis added) 1800 Atlantic, 552 So.2d at 951-952. I do not concur that 1800 Atlantic stands for the proposition that quantified hydrographic measurement of flushing is in all cases an essential element of a prima facie showing that a marina project will not cause violations of water quality standards. Notwithstanding the above noted statement of the court in 1800 Atlantic that "there is no finding of fact . . . that quantifies 'how productive the marine habitat may be' . and no record support . . . that there would be some quantifiable diminution in the quality of marine habitat attributable to [the] project," 552 So.2d 951, the court did not reject the finding that the project adversely affected the conservation of fish and wildlife, fishing or recreation values, and marine productivity. Indeed, had the court rejected the above finding due to lack of quantified findings the court would never have gone on to reach the issue of mitigation because in 1800 Atlantic mitigation could only become relevant if the applicant was unable to provide reasonable assurance that the project satisfies the public interest criteria of Section 403.918(2) (a), Florida Statutes. See Section 403.918(2)(b), Florida Statutes. I do agree that in some cases quantified hydrographic studies of flushing may be required in order to provide reasonable assurances. Thus, in Rudloe v. Dickerson Bavshore, Inc., 10 FALR 3426 (DER Case No. 87-0816, June 9, 1988), my predecessor held that a dye tracer study was necessary to provide quantitative information about dilution rates and directions on dispersion of pollutants emanating from a proposed marina site which was in "close proximity" to Class II waters approved for shellfish harvesting. 10 FALR at 3447-48. However, the need for such quantified studies must be determined on a case by case basis and is not required as a matter of law for all marinas. 5/ Far me to determine as a matter of law that experts may establish a fact only by certain types of evidence would be an unwarranted and unwise intrusion into the scientific domain of the expert. Thus, in Kralik v. Ponce Marine, Inc., 11 FALR 669, 671 (DER Final Order, Jan. 11, 1989), my predecessor held that expert testimony with regard to flushing does not lack credibility just because a hydrographic study had not been conducted. Of course, the finder of fact has the ultimate say on how much weight an expert opinion should be given if it is not based on a quantified study. Thus, whether an expert testifying on adequacy of flushing has conducted a quantifiable hydrographic study merely goes to the weight of the evidence. Kralik, 11 FALR at 671. I only conclude that a quantified hydrographic study for a proposed marina is not in all cases essential for a showing of reasonable assurances that water quality standards will not be violated. Accordingly, to the extent that the Hearing Officer's findings of fact state that a quantified hydrographic study is required in all cases as a prima facie element of a showing of reasonable assurance that a project will not violate water quality standards, I reject such statement as a mislabled and incorrect conclusion of law. Reasonable Assurance That Flushing Is Adequate To Prevent Violations of Water Quality Standards I read Speer's Exceptions Nos. 1, 3, 4, 5, 6, 7 and 8 in whole or in part as taking exception to the Hearing Officer's finding that under the facts of this case a quantified hydrographic study was needed in order to provide reasonable assurance that the project would not cause violations of water quality standards, and that because such a quantified hydrographic study had not been conducted, reasonable assurances had not been provided. (F.O.F. Nos. 33, 35, 38- 39, 40, 43-45, 64, 66 and 69) As noted by the Hearing Officer, the applicant's expert testimony concerning the adequacy of the flushing consisted of general statements describing visual observations of river and tidal flows which, together with past experience and knowledge of the general area of the project, formed the basis for the experts' opinions that a quantified hydrographic study was not necessary for this project. (R.O. at 22-23) Thus, far example, Mr. Charles C. Isiminger, accepted as an expert in marina design and hydrographic engineering testified that based on his knowledge of the area, its riverine and tidal flows, a hydrographic documentation was not needed to provide reasonable assurance that the project would not cause water quality violations. Mr. Isiminger also testified that any pollutants entering the water from the marina would be flushed out of the area within one tidal cycle. (Tr. at 65-66, 70, 77- 79, 93, 110, 125, 128, 134) Mr. Thomas Franklin, an environmental supervisor from the Department testified that: the hydrographic survey was not really necessary due to the location of the project being in open waters and in close vicinity to the Inlet with a large volume of tidal waters moving in this area, plus the fact that it was further enhanced by flushing due to the St. Lucie River being -- basically coming around Hell Gate point [sic] and funneling out into this estuary. (emphasis added) TR at 437. Other experts also testified that the area was well flushed and that a quantified hydrographic study was not needed in this case. (Jacqueline Kelly, Tr. at 187; John Meyer, Tr. at 319, 322, 341; Gerald Ward, Tr. at 44749) 6/ Speer asserts that the Hearing Officer's finding that a quantified hydrographic study is required in this case cannot stand in light of the unrebutted expert testimony that the marina site will be well flushed and that the rate of flushing provides reasonable assurances the water quality standards will not be violated. I have found no competent substantial evidence in the record which would support a finding that under the facts of this case a quantified hydrographic study is required. I did note that in Footnote 21 of the Recommended Order (R.O. at 20) the Hearing Officer states: Tidal range is only one of the types of data used to quantify flushing rates and pollutant dispersal rates. See TR at 78. Other appropriate data include: overall flow rates, mid tide flow, flow amplitude (the magnitude of the flow without regard to direction, i.e., speed as opposed to velocity), horizontal current distribution, downstream plume characteristics, and field verification using a dye tracer. All of this data is needed to fully describe and quantify flushing rates and pollutant dispersal rates. (citing testimony of Mr. Isiminger at Tr. 88-94) At first blush this may appear to be competent substantial evidence supporting a finding that a quantified hydrographic study is necessary in this case. However, when the testimony is read in its complete context, it is clear that Mr. Isiminger is testifying as to what is necessary to do a hydrographic study when one is needed, and is not testifying that such a study is needed in this case. (Tr. 88-94). I also note that the record contains a memo written by Dr. Kenneth Echternacht, a hydrographic engineer employed by the Department. (Tr. at 67-70) This memo was admitted without objection. (Tr. at 23) The memo states in part that "without . . . hydrographic documentation, reasonable assurance cannot be given that the project will not cause problems." (Tr. at 70; Pet. Exh. No. 10) 7/ Dr. Echternacht was not called as a witness at the hearing and the letter was not offered as evidence of the opinion of Dr. Echternacht or the Department at the time of the de novo hearing. To the contrary, the above noted testimony of Mr. Franklin and the testimony of Jacqueline D. Kelly, an environmental specialist of the Department accepted as an expert in evaluating impacts of environmental dredge and fill projects (Tr. at 187, 195; R.O. at 3), clearly establish that at the time of the de novo hearing the Department was of the opinion that further hydrographic documentation was not needed. The Hearing Officer noted that Mr. Meyer testified that the flushing is a "very, very complicated dynamic situation." (Tr. at 320). The testimony was as follows: Q. So you don't know for sure whether the currents here impact this at all or stay offshore from it? A. Oh, the currents definitelv affect it, and you do have interchange -- as I mentioned before, a very high rate of interchange on a daily basis on every tide. Q. Are you saying that the current that flows through here every day flows right through the site? A. We're dealing with two different things here. We're dealing with your currents, your general migration of waters from the estuary from the inland areas down. You're also dealing with tidal effects coming in and out, and it's a very, very complicated dynamic situation. For me to try to tell you exactly how these things work would be impossible without having a very, very long drawn-out expensive study done on the entire area, and I have not reviewed any studies like that. Tr. at 319-20 (emphasis added) When taken in its context it is clear that Mr. Meyer is testifying that there is a very high rate of exchange on a daily basis on every tide. The fact that he viewed the exact details of the flushing as very complicated in no way retracted his statement that there was a very high rate of exchange on every tide. My review of the record leads me to concur with Speer that no testimony, either on direct, cross-examination, or examination by the Hearing Officer, nor any other evidence was introduced to rebut the expert testimony presented by Speer and the Department that flushing on the site was adequate to provide reasonable assurance that water quality standards will not be violated. 8/ As a general rule, the trier of fact may not arbitrarily reject uncontroverted evidence as proof of a contested fact. Merrill Stevens Dry Dock Co. v. G. & J. Investments, 506 So.2d 30 (Fla. 3d DCA 1987), rev. den., 515 So.2d 229 (Fla. 1987); City of St. Petersburg v. Vinoy Park Hotel, 352 So.2d 149 (Fla. 2d DCA 1977); In Re: Estate of Hannon, 447 So.2d 1027 (Fla. 4th DCA 1984). This does not mean that a mere scintilla of unrebutted evidence is sufficient to establish a contested fact in an administrative hearing. At least in the context of administrative proceedings, the unrebutted evidence still must be competent substantial evidence to support a finding of fact. 9/ There is no suggestion that the Hearing Officer rejected the unrebutted testimony of the experts of Speer and the Department as not being competent substantial evidence. In fact, in the light of the testimony of Mr. Isiminger (Tr. at 65- 66), Mr. Ward ( Tr. at 447-449), Mr. Meyer (Tr. at 238- 239), and Mr. Franklin (Tr. at 345-350), it is beyond peradventure that there is competent substantial evidence to support a finding that flushing is adequate to provide reasonable assurance that the marina will not cause violations of water quality standards. It is clear from the context of the Recommended Order that the Hearing Officer believed that reasonable assurance had not been provided only because he believed that a quantified hydrographic study was required as a matter of law. Although I reject the Hearing Officer's conclusion that a quantified hydrographic study must be conducted as a matter of law for all marina applications, I must still determine whether a quantified hydrographic analysis is required under the facts of this case. In Rudloe v. Dickerson Bayshore, 10 FALR 3426 (DER Final Order, June 9, 1988) it was held that a hydrographic study was not adequate because it did not include a quantified dye tracer study. Id., 10 FALR at 3448. In Rudloe, as in this case, the marina was located in Class III waters, but near Class II waters. However, in Rudloe, the marina site was much closer to the Class II waters (approximately 1,700 feet in Rudloe (10 FAIR at 3430) as compared to approximately 8,000 feet in this case). (R.O. at 16, F.O.F. No. 26) Also, the Rudloe case is significantly different from this case in that competent substantial expert opinion was presented in Rudloe that the marina would adversely impact the Class II shellfish harvesting area. See Rudloe, 10 FALR at 3433-35, 3437-38 (testimony of DNR expert that operation of marina would result in closure of waters to the harvest of shellfish; testimony of Dr. Robert Livingston that the hydrographic drogue studies conducted were inadequate.) In this case, neither expert nor lay testimony was offered by Barringer to show that operation of the marina would result in violation of water quality standards or have any adverse impact on the Class II shellfish waters. 10/ I conclude that the facts of this case as found by the Hearing Officer are not sufficiently similar to the facts of Rudloe so as to justify holding as a matter of law a quantified hydrographic study is necessary to establish the required reasonable assurances. Since the record contains competent substantial evidence that flushing is adequate to provide reasonable assurance that the marina will not cause water quality violations, and since there is no competent substantial evidence in the record to support the Hearing Officer's contrary finding, I must accept the exception of Speer and reject the Hearing Officer's findings of fact to the contrary. In this case I note that I am not so much rejecting findings of fact as rejecting a conclusion of law. As I noted, the Hearing Officer's finding is really based on a conclusion of law which I reject. This leaves only unrebutted competent substantial evidence that there will be adequate flushing to provide reasonable assurance that the operation of the marina will not result in water quality violations. There is no rational basis to reject this unrebutted competent substantial evidence. Therefore, I must accept as proven that the applicant has provided the reasonable assurances that operation of the marina will not result in water quality violations. Merrill Stevens Dry Dock; City of St. Petersburg; Estate of Hannon; supra, Effect On Class II Waters Speer's Exceptions Nos. 7 and 8 take exception to the Hearing Officer's finding that Speer failed to provide reasonable assurance that the marina would not have a "negative effect" an the Class II waters of the St. Lucie Inlet and the Great Pocket. (F.O.F. No. 43) Rule 17-312.080(6)(b), Fla. Admin. Code provides: The Department also shall deny a permit for dredging and filling in any class of waters where the location of the project is adjacent or in close proximity to Class II waters, unless the applicant submits a plan or proposes a procedure which demonstrates that the dredging or filling will not have a negative effect on the Class II waters and will not result in violations of water quality standards in the Class II waters. In this case expert testimony was presented by Speer and the Department that due to the distance of the marina site from the Class II waters (8,000 feet) the marina site was not in close proximity to the Class II waters, and due to the rapid flushing of the area, the construction and operation of the marina would neither have a negative effect nor would result in violations of water quality standards in the Class II waters of St. Lucie Inlet and the Great Pocket. (Isiminger, Tr. at 96, 126-27; Meyer, Tr. at 254-55) I find that the record contains no competent substantial evidence to rebut the evidence introduced by Speer and the Department that the marina will have no negative effect on Class II waters and will not result in violation of water quality standards in Class II waters. Accordingly, I must accept Speer's exception and reject the Hearing Officer's finding. Merrill Stevens Dry Dock; City of St. Petersburg; In Re: Estate of Hannon; supra. Reasonable Assurance That Operation Of The Marina Will Not Result In Prop Dredging Or Violations Of The State Water Quality Criterion For Turbidity Speer's Exceptions Nos. 1, 2, 9-12, and 16 in whole or in part take exception to the Hearing Officer's finding that Speer failed to provide reasonable assurance that the boat traffic from operation of the marina would not cause prop dredging or violations of the water quality criterion for turbidity. (F.O.F. Nos. 33-34, 45, 48, 52-53, 64, and 67) 11/ On one hand, there was testimony that the depths of the marina, in combination with the size of boats allowed in the various slips, would allow for a one foot clearance from the bottom of the boats to the bottom of the marina, and that this clearance, in combination with speed limits in the marina, would provide reasonable assurance that operation of the marina would not result in prop dredging or turbidity violations. (Isiminger, Tr. at 104-107, 118; Meyer Tr. at 263-65, 299, 304- 305; Kelly, Tr. at 189-190; Ward, Tr. at 460) On the other hand, Bruce Graham, admitted as an expert in marine biology testified that: "A large boat, three feet from the bottom, I think would resuspend sediment." (Graham, Tr. at 378). The Hearing Officer, noting that when asked if one foot clearance is sufficient to prevent prop dredging and resultant turbidity violations, a Department witness, testified: I would have to say that we simply don't have enough documentation to know this for a fact. We know that a foot gives us a degree of comfort that there will not be prop wash. In certain instances -- a tug boat, for instance, you know, with huge engines, you're going to have prop wash over a much -- over a large area and with probably much more than a foot of clearance. But for the normal, typical marina a foot, as I say, gives us a degree of comfort that we have settled on. Neyer, Tr. at 264. The Hearing Officer concluded that the witnesses of Speer and the Department could not explain the reasons or efficacy of the "one foot policy" except to say that in their experience the one foot policy was adequate to prevent prop dredging and turbidity violations. (R.O. at 28 n.35)0 The Hearing Officer thus found that Speer and the Department failed to "prove up" the one foot policy -- i.e., failed to elucidate and explicate the reason for the policy. 12/ Clearly the Hearing Officer placed more weight on the testimony of Mr. Bruce Graham than that of Isiminger, Meyer, Kelly and Ward. Since I cannot say that the testimony of Graham was not competent substantial evidence, I am not at liberty to reweigh the evidence or reject the Hearing Officer's finding of fact. See, Florida Dept. of Corrections v. Bradley, 510 So.2d 1122 (Fla. 1st DCA 1987); Heifetz v. Department of Business Regulation, 475 So.2d 1277, 1281 (Fla. 1st DCA 1985); Sections 120.57(1)(b)10., and 120.68(10), Florida Statutes. Speer contends that Barringer presented no evidence that prop dredging will cause sufficient turbidity to violate the state water quality turbidity criterion of 29 NTUs. 13/ That contention misses the point. The burden is on Speer to establish by the preponderance of evidence that reasonable assurance has been provided that operation of the marina will not result in violations of the water quality criterion for turbidity. Florida Department of Transportation v. J.W.C., Co., 396 So.2d 778 (Fla. 1st DCA 1981). The Hearing Officer, as the finder of fact, concluded that Speer failed to do so. Accordingly, I reject the exception of Speer and accept the Hearing Officer's finding of fact that Speer failed to provide reasonable assurance that operation of the marina would not cause prop dredging or violations of the state water quality criterion for turbidity. Manatee Impacts and the Public Interest Test Speer's Exceptions Nos. 13 and 17 take exception to the Hearing Officer's finding that Speer failed to do a quantified study of impacts to manatees and therefore failed to provide reasonable assurance that the marina will not have an adverse impact on manatees, their migratory patterns, and their habitat. (F.O.F. Nos. 61, 64 and 68) The Hearing Officer reasoned as follows: Instead of a traffic study, the Applicant and DER presented evidence in the form of general statements that manatees need not migrate north and south through the approach channel. According to the Applicant and DER, manatees can migrate across the project site by one of two alternative routes. They can migrate in one or two feet of water under moored boats and then under wave breaks on the north and east piers, or they can migrate in the shallow water landward of the west boundary of the project. That evidence was not persuasive and was controverted by competent, substantial, and persuasive evidence that manatees would be deterred from migrating under the project footprint by substantial obstacles in their path. Manatees migrating under the project footprint would be exposed to 86 or more moving boats with powerful engines and drafts of four to five feet in waters covering approximately 20,800 square feet. It could be argued, or course, that 86 or more boats would not be moving in and out of the marina at one time. However, it is impossible to estimate occupancy rates, length of stay, and frequency of boat trips without a traffic study. (R.O. at 35, n. 51) As Speer's exception notes, there was testimony that because of the width of the river and boat speed restrictions in the project area, there would be no adverse impacts an the manatee from the marina. (Kelly, Tr. at 162; Meyer, Tr. at 255-56, 331- 32; Isiminger, Tr. at 130) The St. Lucie/Jupiter/Hobe Sound waterways are a major travel corridor for manatees. (DER Exh. No. 4) Between 1974 and December 1990, there were ten water craft related manatee fatalities within the boating sphere of influence of the project. (DER Exh. No. 4) In order to reduce impacts on the manatees, the proposed permit contains the following specific conditions: S.C. No. 13: The permittee agrees to install and maintain a minimum of one manatee education/display on the main access pier during and after construction. S.C. No. 15: The permittee agrees that any collision with a manatee shall be reported immediately [to DNR and U.S. Fish and wildlife Service]. S.C. No. 18: The permittee shall post four (4) manatee area/slow speed signs, two of which would be spaced along the perimeter pier and two of which would be located on the outside of the marina for all boating traffic to observe within the marina facility. (DER Exh. No. 3) 14/ There was testimony that the piers, once constructed, would not impair the passage of manatees. (Isiminger, Tr. at 114- 115) On the other hand, there was some testimony that manatees may have to go around the project rather than through it. (Meyer, Tr. at 311) The existing boat traffic past the site of the project to the Inlet was "rough1y estimated" at 50 to 100 boats a day. (Meyer, Tr. at 337) The U.S. Fish and Wildlife Service determined that "while [the project] may negatively affect, it is not likely to jeopardize the continued existence of the West Indian Manatee." (Tr. at 120-21) The Hearing Officer concluded that reasonable assurance as to adverse impacts on manatees could not be provided absent a quantified traffic study. (R.O. at 35, n. 51) In Coscan Florida, Inc. v. Department of Environmental Regulation, 12 FAIR 1359 (DER Final Order March 9, 1990), the Department held that the information needed to determine a marina's impact on manatees and the necessary actions to mitigate such impacts must be decided an a case by case basis. For example, in Sheridan v. Deep Lagoon Marina, 11 FALR 4710 (DER Final Order, Aug. 24, 1989), 15/ a marina sought to expand by adding 113 new wet slips. The marina was required to develop a manatee protection plan far the surrounding portions of the Caloosahatchee River, all new slips were limited to sail boats until the manatee protection plan was implemented and enforced, and power boat occupancy was limited to 75% of the total 174 wetslips in any event. The marina also made available a wet slip for use by the Florida Marine Patrol. In this case there is evidence of significant boat related manatee fatalities in the boating sphere of influence of the proposed marina. There is also evidence of existing traffic of 50-100 boats per day past the project site. In view of the fact that this project would add 86 slips and a public fueling facility, it seems likely that that the project will significantly increase both boat traffic and the threat of manatee collisions. Accordingly, I concur with the Hearing Officer that there is competent substantial evidence to support a finding that further studies are needed to determine what, if any, additional manatee protection conditions are needed to provide reasonable assurance that manatees will not be adversely affected. I conclude that the applicant did not provide reasonable assurance that the operation of the marina will not have an adverse impact on manatees, their migratory patterns, and their habitat, and therefore failed to provide reasonable assurance that the project is not contrary to the public interest. Therefore, I reject the exception of Speer. Cumulative and Secondary Impacts Speer's Exception No. 15 takes exception to the Hearing Officer's finding that the applicant failed to provide reasonable assurance that there will be no adverse cumulative pacts created either by the cumulative effects of the object and existing similar projects, or by secondary pacts of the project itself. (F.O.F. No. 66) 16/ Cumulative impact analysis takes into consideration the cumulative impacts of similar projects which are existing, under construction, or reasonably expected in the future. Conservancy v. A. Vernon Allen Builder, supra; Section 403.919, Florida Statutes. Secondary impact analysis considers the impact of the project itself and of any other relevant activities that are very closely linked or causally related to the permitted project. Conservancy, 580 So.2d at 778; J.T. McCormick v. City of Jacksonville, 12 FALR 960, 980. 17/ Thus, in Conservancy the secondary impact analysis was required to consider the environmental impacts of development of 75 estate homes on an island where the development would be reasonably expected as a result of the permitted laying of a subaqueous sewer line. Similarly, in del Campo v. Department of Environmental Regulation, 452 So.2d 1004 (Fla. 1st DCA 1984), the Department was required to consider the environmental impacts of the foreseeable development of an island facilitated by the permitted building of a bridge to the island. In this case there is competent substantial evidence that there are other marinas located 1,750 feet downstream in Willoughby Creek, and 5,000 feet downstream in Manatee Pocket. (R.O. F.O.F. 31; Isiminger, Tr. at 112; Meyer, Tr. at 261) The record contains competent substantial evidence that the cumulative impact of the project and the existing marinas in Willoughby Creek and Manatee Pocket will not result in violations of state water policy. (Isiminger, Tr. at 125; Kelly, Tr. at 167) I cannot say that the testimony of Isiminger and Kelly on cumulative impacts is not competent, substantial evidence. In light of the fact that there is no competent substantial evidence to indicate that cumulative impacts would result in water quality violations, I must accept Speer's exception and reject the Hearing Officer's finding. Merrill Stevens Dry Dock; City of St. Petersbur; In re: Estate of Hannon; supra. As to secondary impacts, the Hearing Officer pointed out that Speer did not introduce any evidence as to whether there would be secondary impacts to water quality as the result of further development or increased utilization of the uplands facilities. (See F.O.F. 66, n.59, R.O. at 39) Such further development or increased utilization of upland facilities is reasonably foreseeable and would be very closely linked or causally related to the building of an 86 slip marina with public fuel services. As noted above, the applicant has the burden of providing reasonable assurances as to cumulative and secondary impacts. Brown v. DER, supra; Conservancy, supra. However, neither the pleadings nor the pre-hearing stipulation raised the issue of the adequacy of the secondary impact analysis. In a case such as this where the Department's notice of intent to issue a permit has been challenged by a third party, the applicant's prima facie case need only include the application and the accompanying documentation and information relied on by the Department as the basis of its intent to issue. Florida Department of Transportation v. J.W.C., 396 So.2d 778, 788 (Fla. 1st DCA 1981). The petitioner challenging the permit must identify the areas of controversy and allege a factual basis for its contentions that the applicant did not provide the necessary reasonable assurances. J.W.C., 396 So.2d at 789. See also Woodholly Assoc. v. Department of Natural Resources, 451 So.2d 1002, 1004 (Fla. 1st DCA 1984). Since Barringer did not identify this issue and did not allege any factual basis for a contention that the secondary impact analysis was inadequate or incorrect, I may not rule on the issue in this order. Miscellaneous Exceptions To Findings of Fact Speer's Exception No. 14 takes exception to the Hearing Officer's finding that Speer failed to provide reasonable assurance that the project will have no adverse impact on (1) the relative value of functions being performed by areas affected by the project, including seagrasses, shell fish, and fin-fish, and (2) recreational and commercial values in the vicinity. (F.O.F. No. 64) Speer contends that this finding is not supported in the record by competent substantial evidence and is contrary to unrebutted testimony of Ms. Kelly and Mr. Isiminger. (Kelly, Tr. at 159, 161-62, 165-67; Isiminger, Tr. at 73) I cannot say that the testimony of Isiminger and Kelly is not competent, substantial evidence, and I find no evidence in the record to rebut the testimony of Kelly and Isiminger. Therefore, I must accept Speer's exception and reject the Hearing Officer's finding. Merrill Stevens Dry Dock; City of St. Petersburg; In re: Estate of Hannon; supra. Speer's Exception No. 3 takes exception to the Hearing Officer's finding that Speer failed to provide a current water quality analysis. (F.O.F. No. 35) A water quality analysis was submitted in April of 1990, shortly after the permit application was filed. (R.O. at 2, 19; F.O.F. No. 34) I find no competent substantial evidence in the record to suggest any reason for believing that the water quality has changed since April of 1990. I agree with Speer that, absent some specific reason for believing that the water quality has changed since the date of a study conducted contemporaneously with the permit application, there is no requirement to provide an updated water quality analysis. RULINGS ON EXCEPTIONS TO CONCLUSIONS OF LAW Need For Quantified Hydrographic Study Speer's Exceptions Nos. 1, 7 and 9, in whole or in part, take exception to the Hearing Officer's conclusions of law that a quantified hydrographic study was needed to provide reasonable assurances that the operation of the marina would not result in violations of water quality standards and would would not have a negative effect on Class II waters. For the reasons stated in Parts III(1), (2) and (3) above, I accept this exception and reject the above noted conclusions of law. Introduction Of Issues Not Set Forth In Pleadings Or Pre-Hearing Stipulations Speer's Exceptions Nos. 1, 2, 3, and 5, in whole or in part, take exception to the Hearing Officer's consideration of issues of (1) the need for a quantified hydrographic study, (2) the proximity of the site to Class II waters, (3) turbidity and prop dredging, (4) cumulative impacts, and (5) the need for a quantified study on manatee impacts. For the reasons set forth in Part 111(6) above, I agree that, absent waiver, a petitioner challenging an intent to issue a permit may not raise issues at the hearing which were not raised in the pleadings or pre-hearing stipulations. However, in this case the issue of manatee impacts was raised in the pleadings, and Speer was on notice that it had the burden of proof on that issue. As to the other issues, even if I accepted far the sake of argument that they were not raised in the pleadings or pre-hearing stipulations, Speer failed to timely object to the raising of these issues at the hearing and therefore waived any objection. See Sarasota County and Midnight Pass Society v. Department of Environmental Regulation, 13 FAIR 1727 (DER Final Order, April 4, 1991). Therefore, I reject the above exceptions. Proximity To Class II Waters Speer's Exception No. 2 takes exception to the Hearing Officer's conclusion of law that Speer was required to submit a plan which demonstrated that the marina would not have a negative effect on Class II waters. (C.O.L. Nos. 12 and 13) I do not agree that where a proposed marina site is 8,000 feet from Class II waters and where the site is rapidly flushed as noted in Parts 111(1), (2) and (3) above, that the site is in close proximity with the Class II waters within the meaning of Rule 17-312.080(6), Fla. Admin. Code. Accordingly, I accept this exception and reject the above note conclusion of law. Public Interest Test Speer's Exception No. 4 takes exception to the Hearing Officer's conclusion of law that Speer failed to provide reasonable assurance that the project was not contrary to the public interest. (C.O.L. Nos. 17 and 20) For the reasons set forth in Parts III(4) and (5) above, I reject this exception. Cumulative Impacts Speer's Exception No. 5 takes exception to the Hearing Officer's conclusion of law that Speer failed to provide reasonable assurances that cumulative impacts would not result in water quality violations, and that such assurances could only be provided by a quantified study. For the reasons set forth in Parts III (1), (2), (3) and (6) above, I accept this exception and reject the above noted conclusions of law. Modification Of Permit Conditions Speer's Exception No. 6 takes Exception to the Hearing Officer's conclusions of law Nos. 24-34. These conclusions of law concern questions of the authority of the Hearing Officer and me to modify the conditions of the permit. I agree with Speer that since none of the parties have requested any modifications, these conclusions of law are irrelevant. 18/ Therefore I accept the exception and reject the above noted conclusions of law as irrelevant. Miscellaneous Speer's Exception No. 8 in part takes exception to the Hearing Officer's conclusion that Speer and the Department failed to provide reasonable assurance as to prop dredging and turbidity violations because neither Speer nor the Department sufficiently proved the basis for the one-foot clearance policy. For the reasons set forth in Part III(4) above, I reject this exception. Speer's Exception No. 8 in part takes exception to the Hearing Officer's conclusion that the question of whether mitigation is adequate is a question of law. I agree with the Hearing Officer and reject this exception. See 1800 Atlantic Developers v. Department of Environmental Regulation, 552 So.2d 946, 955 (Fla. 1st DCA 1989).

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that Respondent, Department of Environmental Regulation, enter a Final Order denying the application for a permit to construct the proposed project and denying the request for determination of improper purposes. RECOMMENDED in Tallahassee, Leon County, Florida, this 16th day of June, 1992. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399 1550 (904) 488 Filed with the Clerk of the Division of Administrative Hearings this 16th day of June, 1992.

Florida Laws (4) 120.57120.60120.68267.061 Florida Administrative Code (1) 28-24.009
# 5
BREVARD GROVES, INC., AND H AND S GROVES, INC. vs FLORIDA CITIES WATER COMPANY, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-004177 (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 08, 1991 Number: 91-004177 Latest Update: Jul. 27, 1992

The Issue On June 7, 1991 the Department of Environmental Regulation (DER) released its intent to issue Permit No. DC05-194008, authorizing Florida Cities Water Company (FCWC) to construct a 300-acre restricted public access spray irrigation system for the land application of treated domestic wastewater (Sprayfield Permit). And, on August 6, 1991 DER released its intent to issue Permit No. MS05-194894, relating to stormwater management and management and storage of surface waters (MSSW Permit) for the sprayfield site. Petitioners Brevard Groves, Inc. and H & S Groves, Inc. (Groves), Parrish Properties, Inc., Parrish Management, Inc. (Parrishes), Atico Financial Corp. (Atico) and David and Eleanor Shreve (Shreve), each requested a formal administrative hearing challenging the issuance of the sprayfield permit. Groves requested a hearing challenging the issuance of the MSSW Permit. The ultimate issue is whether FCWC is entitled to these permits.

Findings Of Fact FCWC is a private utility company, with headquarters at 4837 Swift Road, Suite 100, Sarasota, Florida, 34231. FCWC's Barefoot Bay Wastewater Treatment Plant (the WWTP) provides water and wastewater service to the Barefoot Bay development in southern Brevard County, Florida. DER, 2600 Blair Stone Road, Tallahassee, Florida 32399-2900, is an agency of the State of Florida which regulates domestic wastewater treatment and disposal facilities and permits their construction and operation. For domestic wastewater projects, DER is also charged with reviewing applications for stormwater management and management and storage of surface water pursuant to an operating agreement between DER and St. Johns River Water Management District. David and Eleanor Shreve are beekeepers who live approximately a quarter-mile from the proposed sprayfield. They maintain beehives in the groves and woods surrounding the proposed site. The remaining Petitioners own citrus groves that are adjacent to, or in the immediate vicinity of the proposed site. These groves are producing and are actively maintained. The WWTP has a treatment capacity of 0.9 million gallons per day (MGD). As of July, 1990, the WTTP was treating and disposing of effluent from approximately 4,200 residences in the Barefoot Bay development. At buildout, within the five-year life of the Sprayfield Permit, the WWTP will serve 5,000 residents, and will generate approximately 0.6 MGD of wastewater. Disposal of treated effluent is presently achieved by a 40-acre sprayfield, storage ponds and direct discharge of pond overflow to the San Sebastian Drainage District Canal (Canal). In 1986, DER issued FCWC a warning notice to the WWTP regarding an unlawful discharge to the Canal. FCWC met with DER to discuss options to correct the discharge. In 1988, FCWC entered a Consent Order that would allow FCWC to discharge treated effluent into the Canal until a deep injection well could be built for alternative disposal. FCWC also discussed other alternatives with DER, such as golf course irrigation. The Consent Order was amended in 1991 to provide for land application in lieu of deep injection. In accordance with the amended Consent Order, FCWC has submitted monthly monitoring reports to DER, for the WWTP and for the storage (percolation) ponds. DER has never issued a notice of violation to FCWC for failure to comply with monitoring in the Consent Order. The Site The proposed sprayfield site is divided into two large tracts, the "northern parcel" and the "southern parcel." The site is primarily citrus groves. Although some citrus trees were damaged by a freeze in recent years, most are still viable. Most of the areas between the trees and limited areas without trees are covered with dense grasses and weeds. The site, and the surrounding groves, have been significantly altered to provide sufficient drainage for citrus trees, which require well-drained conditions. The area is covered by shallow ditches (swales), between mounded rows of earth comprising beds for the trees. These citrus mounds, created by soil cast up during excavation of the swales, occur on 60-foot centers and rise 2 1/2-3 feet above the bottom of the swales. The swales have pipes at each end, which discharge into an agricultural collection ditch or the Canal. Each block of citrus is surrounded by a collection ditch some 8-10 feet deep. All collection ditches ultimately discharge into the Canal, which borders the site on the north and is approximately 20 feet deep and 100 feet wide. The collection ditches and Canal prevent the entrance of offsite surface water run- off into the site and receive surface water run-off and groundwater seepage from the site. The Sprayfield Project The project is proposed in two phases. Phase I meets total annual effluent disposal needs of 0.55 MGD, using both the proposed sprayfield and the existing 40-acre sprayfield, which will continue in operation for both phases of the project. Phase II meets the total annual effluent disposal needs of 0.6 MGD at build-out. This results in an average annual application rate of 0.54 inch/week or approximately 28 inches per year on the proposed sprayfield. The project is designed to eliminate the current discharge to the Canal. The effluent will be given secondary treatment with basic disinfection. The treated effluent will be pumped from the WWTP to storage ponds and then to the proposed sprayfield. The existing ponds will be retrofitted as storage ponds for Phase I. An additional storage pond will be constructed at the proposed sprayfield for Phase II. The spray irrigation system will operate primarily with four traveling gun sprinklers. Two sets of fixed-head sprinklers will also be used for the two small triangular portions of the site. The traveling sprinklers will be operated for approximately 5.9 hours/day during Phase I and 6.5 hours during Phase II. The four traveling sprinklers will run simultaneously on four of the thirty-three travel lanes (tracks) located between the swales covering the site. Ordinarily each track will be sprayed every eighth day. To make up for days when irrigation is not possible, additional disposal capacity can be obtained by operating the sprinklers for extra shifts on tracks not previously irrigated that day. The site will be mowed regularly, and any accumulated grasses or debris will be removed. Any areas presently in weeds, or the areas not covered by vegetation are reasonably expected to fill in with dense grasses when irrigation commences. Maintaining the grass cover in the swales will prevent erosion of soil and debris into the swales and reduce the need for maintenance of clogged swale outlet pipes. The system is designed and will be operated to avoid ponding or direct surface run-off of sprayed treated effluent. However, there may be some very limited potential for droplets of treated effluent clinging to vegetation being washed into the swales by a heavy storm event immediately following an application. Therefore, the sprinklers will not be operated when the water table is closer than four inches from the bottom of the swales. Operators will know when to spray by reading automatic groundwater elevation monitoring gauges installed in several places throughout each block of citrus, including the middle. In addition, an automatic device will shut off sprinklers during a rainfall, so that no significant amount of treated effluent will leave the site mixed with stormwater. The site is bordered on three sides by groves and on one side by undeveloped vacant land. The width of the proposed buffer zone from the sprayfield wetted area to the site property line is at least 100 feet, as required in Rule 17-610.421(2), F.A.C., and is substantially wider for extensive lengths of the project border. The buffer is approximately 130 ft. wide on the eastern boundary of the northern parcel, approximately 250 to 235 ft. wide on the western boundary of the northern parcel, and approximately 225 to 160 ft. on the western border of the southern parcel. The distance between the wetted area and adjacent property owners' boundaries is much greater than 100 ft. for other portions of the sprayfield borders due to linear features that provide additional buffering. It is over 200 ft. from the wetted area to the nearest property owner on the northern border of the northern parcel because of the San Sebastian Canal, and 160 ft. on the southern border of the northern parcel and the southern and eastern borders of the southern parcel because of the 60-foot wide Micco Road right-of-way. Aerosal Drift and Other Off-Site Impacts While Petitioners allege that their groves would be contaminated by aerosol drift from the site, they presented no expert or other competent, substantial evidence on the extent or volume of such drift. FCWC air modelling expert, Dr. Robert Sholtes, used the EPA Industrial Source Complex Model (ISC), the most commonly used predictive model in the air pollution community, to evaluate the project's aerosol drift. While the sprinklers are planned to be operated a maximum 6.5-hour shift, a conservative 7.0-hour shift was used. Other data inputs to the ISC Model were hourly windspeeds at the Daytona Beach weather station for five years; sprinkler nozzle size and pressure; and droplet size, distribution and settling rates obtained from the American Society of Agricultural Engineers. The model yielded the annual average deposition of sprayed effluent in grams per square meter (gm/m2) outside the wetted area for one sprinkler as it moves along its track. The accumulated deposition off the site property line, considering operation of all tracks, can be predicted using these results. Because heavy deposition of droplets settles out fairly rapidly, the aerosol from tracks farther into the site does not significantly affect the maximum impact shown for one track. Due to the prevailing east and west coastal winds, heaviest deposition will occur off the eastern and western property line of the site. The volume of treated effluent that will be blown offsite is not substantial. The greatest volume is approximately 1000 millimeters/square meter/year (ml/m2/yr) off the eastern property line out to approximately 50-75 feet, and 500 ml/m2/yr off the western property line out to approximately 75 feet. A maximum of 100 ml/m2/yr is predicted and a maximum of 50 ml/m2/yr is predicted off the southern and northern lines, respectively. In practice, volumes of aerosol drift off-site will be below the predicted levels in areas where trees occur in the buffers. Most significantly, there are existing rows of citrus trees along the eastern border of the northern parcel within the buffer area, which is the area of heaviest predicted drift. In addition, aerosol drift will be minimized by operating procedures. Wind speed and direction will be monitored at the site. If the wind is over 20 miles per hour, there will be no spraying. For winds of lesser speeds, the spray tracks on the edges of the sprayfield will not be used during a strong directional wind, e.g., for a wind blowing east, the track on the eastern border will not be utilized. The tracks are on approximately 240-foot centers. Therefore, elimination of spraying for the track on the edge of the site will have the effect of withdrawing the aerosol drift deposition pattern 240 feet further into the sprayfield. Considering that the farthest extent of the maximum 1000 ml/m2/yr levels of drift is 75 feet, such a program will be very effective in minimizing drift. Because no motors will be required to operate the site, significant noise is not expected. The treated effluent will not contain significant amounts of odor-causing constituents, and odors are not expected. Finally, lighting is not planned on the proposed sprayfield, so this is not expected to be a source of offsite impact. Assurances for Proposed Application Rate A determination of the site's ability to accept treated effluent at the maximum proposed application rate of 0.54 inch/week without adverse effects was based on (1) the hydraulic loading capacity of the site to receive the applied water, considering soil permeability and other physical site conditions, and (2) the allowable nitrogen loading rate, considering the ability of the vegetation to uptake the nitrogen contained in the treated effluent. The U.S. Environmental Protection Agency (EPA) publishes a general manual for technical assistance in designing land application systems across the United States. This manual, "Land Treatment of Municipal Wastewater - Process Design Manual" (EPA Manual), is cited as a general technical guidance source in DER Rule 17- 610.300(4), F.A.C. The EPA Manual contains formulae for the calculation of both the hydraulic loading capacity and the allowable nitrogen loading rate. The EPA Manual recommends use of the more restrictive of the hydraulic loading capacity or the allowable nitrogen loading rate as the hydraulic loading rate for the project. Hydraulic Loading Capacity. A hydraulic loading capacity of 0.63 inch/week for the proposed sprayfield was determined based on field exploration, laboratory testing, hydrogeological conditions and engineering evaluation, summarized in a report included in the application. This 0.63 inch/week hydraulic loading capacity is above the maximum proposed application rate of 0.54 inch/week and substantially below the maximum rate of 2 inches/week allowed by DER Rule 17-610.423(4), F.A.C. EPA Equation 4-3 for hydraulic loading capacity balances the volume of water that enters the site with the volume of water that leaves the site. Values in Equation 4-3 are evapotranspiration, which is the water released to the atmosphere from soil surfaces and by vegetation (ET); precipitation rate (rainfall); and Pw, which is water removed by vertical percolation downward through the soils. Due to the high vertical permeabilities of the sandy soils at this site, unrefined use of EPA Equation 4-3 would give a very high hydraulic loading capacity for this project, on the order of 10 times that proposed by FCWC. Therefore, a more detailed input/output water balance formula was used to determine annual hydraulic loading capacity (applied effluent in the formula) of 0.63 inch/week: rainfall + applied effluent + groundwater inflow = evapotranspiration, + groundwater outflow + surface run-off + evaporation + irrigation losses. The average annual rainfall, based on data from the U.S. NOAA weather station at Melbourne, is 48.17 inches. Due to the isolating effect of the deep ditches surrounding the site, groundwater inflow is considered to be so negligible that it was not assigned a value for the equation. ET, based on standard scientific references, is 45 inches/year for citrus trees. An additional 20 inches/year loss is attributable to grasses covering soil surfaces. In lieu of vertical percolation, groundwater outflow laterally through the surficial aquifer was projected to be 1.8 inches per year, based on hydraulic conductivity and soil permeabilities for the site. Surface run-off of stormwater was estimated to be 10 inches per year. Irrigation losses were estimated at 15% of the amount of applied effluent. Pond Storage Capacity. The proposed application rates for the two phases of the project are annual averages. The volume of storage needed for occasions when conditions preclude application must be determined. DER requires the calculation of storage by analytical means for the 10-year rainfall recurrence interval, using 20 years of rainfall data, and accounting for all water inputs on a monthly basis, using site-specific data. A minimum storage volume equal to three days application is required. Rule 17-610.414 (2), F.A.C. Calculations presented in the application met these requirements and showed storage needs of 8.08 million gallons (MG), or approximately 15 application days' volume, for Phase I; and 15 MG, or 25 application days for Phase II. Additional storage calculations, reflecting the monthly variations of wastewater inflow due to the seasonal population, were prepared for Phase I. These calculations reflected the same storage requirements. Petitioners' Allegations Regarding Application Rate and Storage Although they had prepared no analyses, performed no calculations, conducted no laboratory tests and undertaken only one field test (test hole for groundwater level), Petitioners' witnesses asserted that site conditions precluded successful operation of the sprayfield at the maximum proposed application rate of 0.54 inch/week. They asserted that swale pipes would plug and a clay "hardpan" at the bottom of the swales would prohibit percolation of stormwater. Thus, the swales would be full of water for long periods and further application would be precluded. They also asserted that significant volumes of treated effluent would leave the site as run-off. They alleged treated effluent would enter the swales directly from accumulation of spray and indirectly from seepage from the sides of the citrus mounds. Finally, Petitioners asserted 15 days of storage was inadequate because the site would be too wet for application for at least a month. FCWC presented testimony and evidence based on site reviews, numerous field and laboratory tests, computer modelling, and calculations that successfully refuted these allegations. Petitioners' expert in grove management and local soil conditions, Mr. Burnette, stated that extremely wet conditions required pumping of swales for weeks at a time in nearby groves. FCWC's experts asserted that the proposed sprayfield site currently has, and will continue to have, under proper maintenance, much better drainage than Mr. Burnette's groves, where regular grading of swale inverts and herbicide applications denude soil and cause erosion which plugs pipes and backs up water in the swales. In addition, unlike the situation described in Burnette's groves, the proposed site contains no swales that are lower in elevation than the collection ditches, thereby facilitating stormwater run-off. The top layer of soil comprising the citrus mounds and the swales is relatively clean sand. Petitioners' so-called "hardpan" is a slightly clayey to clayey fine sand layer which separates the upper sand from a thick layer of very clean, beach-type sand. FCWC geotechnical experts determined the clayey sand layer was 18 to 24 inches below the bottom of the swales. Without any field testing, Petitioners' expert hydrogeologist, Mr. Oros, asserted that the clayey sand layer was at the bottom of the swales. In contrast, Mr. Burnette stated that the clayey sand layer occurs four to eight inches below the bottom of the swales on the adjoining groves, where the graded swales are 10 to 14 inches deeper than the shallow swales on the proposed sprayfield site. Thus, Mr. Burnette's testimony supports the FCWC conclusion that this layer is found up to 2 feet below the swales on the proposed site. Moreover, contrary to Petitioners' assertions that the layer acts as a "hardpan", water can pass relatively freely through it and the water table will not "perch" above it. The U.S. Department of Agriculture Soil Conservation Service (SCS) reports a permeability value for this soil type of one to 12 feet per day. Dr. John Garlanger, FCWC expert in subsurface investigation and soil mechanics, conducted a field inspection of the soil and reviewed grain size distribution analyses. He determined that the permeability of the clayey sand layer is about one foot of water per day. Petitioners' expert hydrogeologist concurred that the layer could have this permeability rate. Soil is at the "wilting point" when its water content is too low for plants to transpire additional water. Soil is at "field capacity" when added water "fills up" the soil and it becomes saturated. The "water table" is the level at which the soil is totally saturated. Petitioners erroneously assert that 90% of the 0.54 inch of treated effluent will travel straight down to the water table. Instead, due to capillary action, the first foot of the sandy soil at the site can store about 0.6 inch of water between the wilting point and field capacity. If there is no rain between applications, 100% of the 0.54 inch will be transpired by vegetation out of the first foot of soil. This "resets" the soil moisture content to the wilting point in preparation for another application. If heavy rains cause the soil to remain at field capacity rather than returning to the wilting point through ET, the soil can still absorb up to 2.25 inches of water per foot, or three-fourths to one inch of water per four inches of soil, before it reaches saturation. Therefore, even if the soil is saturated up to 4 inches below the swales, the top 4 inches of soil will still absorb the 0.54 inch of treated effluent without reaching total saturation or causing any run-off. If subsequent heavy rains saturate the remaining soil and raise the water table to the bottom of the swales, the excess rainwater which falls on the saturated surface will run off as stormwater, and most of the treated effluent will remain stored within the soil. Furthermore, because the water table is proposed to be measured at centers of the blocks where, due to distance from the drainage ditches, the water table is closest to the surface, soil storage capacity across the site will exceed these projected levels. Petitioners' experts also asserted that if it rains after the 0.54 inch application, the groundwater will "mound" up below the citrus mounds, creating a hydraulic gradient or head differential (between the water table under the citrus mounds and the water table below the swales) sufficiently great to cause the treated effluent in the mound to flow toward the swales and seep into them from the sides of the citrus mounds. Mr. Golding admitted that such seepage would not occur when the groundwater table is below the bottom of the swales. Nevertheless, he opined that seepage of treated effluent would be considerable because he believed, based on opinion and experience alone, that the water table would be at the bottom of the swales or higher for at least 30 days straight in a "wet year." FCWC's experts successfully refuted these assertions. A significant portion of the treated effluent falling onto the citrus mounds will be stored in the soil as described above. The treated effluent (only applied when water level is 4 inches below the swales) that actually reaches the water table will cause only a very slight "water mound" (only 2 inches in 30 feet) which will not produce any appreciable "head" or lateral flow to the swales. On only three occasions (a total of 8 days) during the wettest year in ten did the "water mound" rise above the bottom of the swales resulting in any groundwater seepage from the citrus mounds into the swales. Thus, during the entire wettest year in ten, less than one-half of 1% (0.12 inch of the approximately 28 inches) of annual applied treated effluent, very diluted with groundwater, might seep from the mounds into the swale. Contrary to Petitioners' expert's assertion that the seasonal high water level (SHWL) was not provided by FCWC, this information was supplied in the application and was reaffirmed by calculations of Dr. Garlanger at rebuttal. The importance attached to the SHWL for this project was not adequately explained by Petitioners. FCWC experts explained that the SHWL is the average (NOT maximum) height of the groundwater during the two to six wettest months of the year. Because the water table varies throughout the year, it is the calculation of the position of the water table from month to month that is significant and is required by DER. This monthly changing water table was the basis of storage water balance calculations contained in the application. Even though the monthly storage calculation in the application meets the DER/EPA requirements, Petitioners' witnesses asserted that the application did not indicate how many days the water table would rise to four inches below the swales and thus how many days spraying was precluded and storage was required. Dr. Garlanger analytically calculated the water table beneath the site, using Darcy's Law, and known parameters at the site, such as the depths of the ditches, the geometry and relative distances, and the thickness and permeability of the soil layers. Thus, although never required for any of the 100 land application projects he has evaluated, Dr. Garlanger performed computer modelling and calculations to predict the daily level of the water table beneath the swales for both Phase I and II during the wettest year in ten. Water inputs in his model included treated effluent and daily rainfall from an actual year (1969) when rainfall reached the levels of the statistically wettest year in ten. Water losses were soil storage, ET, distribution losses, deep percolation and run-off. Treated effluent was not applied when the model predicted that the water table would be higher than four inches below the bottom of the swales and when there was significant rainfall (more than one-hundredth of an inch). This modelling predicted that 6.1 MG/11-day storage was needed for Phase I. Thus, the project as proposed has substantially more storage than needed, with a proposed 8.1 MG/15-day storage. The model produced similar results for Phase II, showing a total 10.1 MG/18-day storage need compared with the proposed 15 MG/25-day storage. Petitioners also challenged various "irrigation efficiency" figures used by FCWC experts. All water leaving a water source, in this case the WWTP, does not reach the roots of the crops for which it is intended. "Irrigation efficiency" expresses this fact as the percentage of water pumped that is used by the vegetation. In the monthly storage water balance calculations the applicant used an "irrigation efficiency" of 70% of the total applied treated effluent, which is recommended in IFAS Bulletin 247 and in the USDA, SCS, "Florida Irrigation Guide"; 15% of the applied treated effluent was attributed to "irrigation losses" in the calculations in the application to determine the hydraulic loading capacity; and Dr. Sholtes stated that data he used indicated that 94% of "the water that came out of the nozzle reached the ground" within the wetted area of the site and the remaining 6% was aerosol drift and evaporation. Petitioners' expert questioned whether an irrigation efficiency of 70%, 85% or 94% should have been used and suggested that the calculations should be redone. The expert misunderstood the terms, comparing the proverbial apples and oranges. With a 70% irrigation efficiency, 30% treated effluent is lost to the plants. Only a small portion of this 30% loss is attributable to aerosol drift and evaporation in the air. Most of the 30% treated effluent hits the ground but is still lost to the plants through evaporation of treated effluent intercepted on plant leaves, losses from the distribution system, e.g., leaky fittings at the WTTP, and percolation of water below the reach of plant roots. The "irrigation losses" (15%) in the application include all of those types of losses, except the treated effluent losses through percolation. This approximately 15% of the total treated effluent appeared as a separate value from "irrigation efficiency." Water Quality Assurances Nitrogen Loading Rate. Because nitrogen is generally the constituent of most concern for sprayfields, EPA Equation 4-4, which is intended to produce a conservative result, projects nitrogen loading possible without exceeding the groundwater standard for nitrate. Two FCWC experts calculated the allowable nitrogen loading rate. James Christopher, project engineer and expert in water quality and chemistry, adjusted the EPA equation to reflect stormwater leaving the site, which is a more technically correct refinement of the equation and has the effect of lowering the allowable rate. A "U value" (the variable for rate of nitrogen uptake by crop)of 100 kilograms/hectare/year (kg/ha/yr) was used by James Christopher. Dr. Harvey Harper, another FCWC water quality expert, an environmental engineer, who has taught numerous university courses in wastewater treatment and has been involved in scientific studies of pollution removal, also calculated the nitrogen loading rate for the annual average rainfall and the wettest year in ten. He did not adjust EPA Equation 4-4 for stormwater run-off, because Petitioners had questioned any deviations from the formula. He used a U value of 150 kg/ha/yr, because he considered a value of 100 too low to be realistic. He used the highest nitrogen value in data from the WWTP. Other values he used in the equation were nearly identical to those of Mr. Christopher. The results were an allowable nitrogen loading rate of 0.75 inch/week for a year of average rainfall and 0.93 inch/week for the wettest year in ten. These rates are substantially higher than the proposed gross hydraulic loading rate of 0.54 inch/week. Petitioners' expert, Dr. J. P. Subramani, asserted that a U value of 0 kg/ha/yr should have been used, although he admitted that a site with a U value of 0 kg/ha/yr would be bare sand devoid of vegetation. The U values of 100 and 150 kg/ha/yr used by FCWC were extremely conservative. The EPA Manual provides U value ranges for forage grasses, at a low of 130-225 kg/ha/yr for bromegrass, to a high of 400-675 kg/hayr for coastal bermuda grass. Ignoring the testimony of FCWC witnesses that the grass would be mowed and removed from the site, Dr. Subramani supported his opinion only with the unfounded contrary assertion that the vegetation on site will not be harvested and removed as a crop. Petitioners alleged that discharges from the site would contaminate surface and ground waters and otherwise adversely affect water quality; inadequate renovation of pollutants would take place in the soil; and the receiving waters were already below standards. Petitioners' experts did no studies or analyses, nor did they predict expected concentrations for any parameters for sprayed treated effluent leaving the site as surface waters or groundwaters. Petitioners' exhibits regarding water quality issues consisted of two single-day monitoring reports for the existing WWTP discharge and the Canal and a set of 1990-91 water quality report sheets for the WWTP. FCWC's expert, Dr. Harper, analyzed the project's impacts on groundwater and on surface waters (the Canal) if the treated effluent were to leave the site as surface run-off in the swales, as groundwater seepage into the collection ditches, or as aerosol drift. Based on 1990-91 water quality monitoring of the WWTP's existing treated effluent, Dr. Harper projected the concentrations of parameters of concern for the treated effluent to be sprayed at the site. Although monitoring of heavy metals is not required at the WWTP, he also projected levels for these parameters based on EPA figures and existing data from two larger domestic wastewater treatment plants. Because those two plants have contributions from industrial and commercial components not found at the WWTP, the projections substantially over-estimated heavy metals expected for the WWTP. Groundwater Impacts. Dr. Harper estimated the pollution removal efficiencies for treated effluent traveling through approximately one foot of soil by reference to the EPA Manual and a study he had performed. He then applied these efficiencies to the projected concentrations for the sprayed treated effluent. Even at maximum projected concentrations, the results showed that projected constituents would be at or better than groundwater quality standards after renovation in the soil. Thus, due to low levels of constituents of concern, including those for which no numerical standard is provided in the rules, the project will not cause groundwater water quality violations and will have no adverse effect on the biological functions in the groundwaters directly underlying the site. Contrary to Petitioners' assertions, DER witnesses stated that DER does not interpret provisions of Rules 17-600.530(4) and 17-610.310(3)(c)4, F.A.C., as requiring background groundwater samples in the application. Because research has shown that groundwater quality results for sprayfields are generally very good, DER routinely defers such sampling until after permit issuance. Thus, the groundwater monitoring plan in the application and in the draft sprayfield permit provides that all monitoring wells will be sampled to establish background water quality and results submitted to DER prior to spray irrigation. DER's expert witness in environmental engineering and wastewater land application design, Christianne Ferraro, as well as John Armstrong, DER's environmental specialist in site contamination clean-up, stated that they had reviewed groundwater monitoring currently provided by FCWC for the WWTP. They found no nitrogen violations. Surface Water Impacts. The preponderant evidence showed that treated effluent will not flow directly into the swales. Therefore, FCWC proved it will not leave site as surface run-off. However, in order to project the worst-case water quality evaluation for droplets greatly diluted by rainwater or groundwater which may enter the swales, it was assumed that all treated effluent landing within swales "made of glass" would run off directly into the Canal. In addition, uptake, removal or dilution likely to occur in the collection ditches was ignored. Pollution removal efficiencies for grassed swales (based on a year-long study) were applied to the projected concentrations for the treated effluent. After renovation in the swales, any treated effluent leaving the site would contain concentrations for parameters of concern at or better than surface water quality standards. Therefore, water quality in the receiving surface waters will not be violated. Due to removal efficiencies for soils, the treated effluent leaving the site as groundwater seepage into the collection ditches is expected to meet surface water quality standards. In addition, the trace quantity of effluent (0.12 inch for wettest year in ten) which may seep into the swales will reach the San Sabastian Canal only after being greatly diluted within the groundwater and filtered and purified in the soil in the citrus mounds and grassed swales. Even projecting ten times the amount of aerosol drift predicted for the project, the water quality impact of any sprayed treated effluent entering the Canal as drift is so small as to be insignificant. Ambient Water Quality. The existing discharge is having minimal effect on the water quality of the Canal. Furthermore, by eliminating the direct discharge, the project will reduce the present impacts on the Canal by 92-99%. Nonetheless, Petitioners suggest that the project may further degrade ambient waters which they allege are already below standards. Dr. Harper assessed the ambient water quality characteristics of the Canal, which is Class III fresh surface water and the ultimate receiving water for the site. Even including water quality data for the Canal put in evidence by Groves, the Canal is not currently at or below any state water quality standards for Class III waters, except for occasional Dissolved Oxygen (DO) levels. Levels of DO in sprayed treated effluent are expected to be very high. Even if groundwater seepage into the collection ditches and the Canal from the proposed sprayfield contains low levels of DO due its travel underground, it will not lower levels of DO in the ambient waters because the groundwater will also be low in BOD, which depresses DO. Thus, groundwater seepage is expected to have a neutral effect on ambient DO or to increase DO levels due to its diluting effect on BOD. Groundwater inflow to the site is negligible but outflow occurs at a significant measured rate. The only significant inputs are sprayed treated effluent and rainfall. Therefore, the groundwater under the site will eventually reach a stable condition where its constituent levels are the average of the constituent levels in rainwater and the treated effluent. The treated effluent to be applied on this site is at or above state groundwater standards. Necessarily, regardless of the condition of the existing groundwater it cannot possibly be degraded by the treated effluent to below state standards and may well be improved by it. Thus, FCWC has provided reasonable assurances that Rule 17- 600.530(4), F.A.C., has been met, without monitoring of ambient groundwaters in the application. The deposition of treated effluent will not violate the standard that all waters of the state shall be free from components which, alone or in combination with other substances, are present in concentrations that are carcinogenic or teratogenic to humans, animals or aquatic species or that pose a serious threat to public health, safety or welfare. Human Health Risk and Contamination. Petitioners allege that the sprayfield poses a hazard for contamination of their properties. They produced no witness or evidence of contamination other than experts in grove management, citrus production and management, and Petitioners themselves, who expressed scientifically unsubstantiated fears of the impact of the sprayfield on human health or the marketing of their fruit and honey. FCWC expert Dr. Christopher Teaf, who teaches biology, toxicology and risk assessment at Florida State University and is also president and principal toxicologist with a firm doing hazardous substance and waste management research, determined that the project poses no off-site contamination hazard. Pathogens. Fecal coliform is a standard measure for the health hazards of treated effluent based on an indicator group of microbiological organisms, present in the intestinal tracts of all warm-blooded animals as well as a number of insects and cold-blooded species. These organisms do not themselves ordinarily cause human disease, but may indicate the presence of other pathogenic organisms. Coliform bacteria are common in water bodies in general, and the state limit for these bacteria is 200/100 ml. Rule 17- 302.560(6), F.A.C. The World Health Organization has concluded that levels as high as 1,000/100 ml constitute an adequate standard and will not be associated with human disease. Only extremely limited numbers of bacteria can survive the hazardous journey from the WTTP to the Petitioners' property. First, required chlorination at the WWTP will reduce the coliforms to no more than 200/100 ml. At that level, pathogenic bacteria are negligible, if present at all. Pressures during ejection from the spray heads will cause a 70-90% mortality rate. Once airborne, bacteria will be killed because of temperature, ultraviolet radiation and desiccation. As water drops evaporate, constituents become more concentrated and the drops become toxic environments for bacteria. Bacteria falling to earth are filtered in the first few inches of surface soils. Any organisms borne off site will find that, due to the antibacterial qualities of citrus peel and fruit and the plethora of chemical agents routinely applied, the adjacent groves are an extremely inhospitable environment. Too few bacteria will survive at FCWC's proposed application levels, or at 10 times those levels, to constitute an infective dose and contribute to the incidence of human disease. Thus, treated effluent in the form of aerosol drift will have no adverse effect on the health of humans or otherwise cause contamination of areas adjacent to the proposed sprayfield. Consumption of Fruit. Bacteria are not taken up by the plant roots and the aerosol drift will not have any effect on the actual health of the citrus trees themselves. The minimal deposition from spray will be removed through washing required by governmental standards to remove dirt, grime and other contamination, such as fungicides, herbicides and pesticides applied as a normal practice in the citrus industry. Based on fifteen years of scientific literature, including the EPA Manual, crops irrigated with treated effluent do not contribute to human health problems in populations that consume those crops. With application of treated effluent with bacterial concentrations, even 10,000 to 100,000 times higher than the standard, there has been no incidence of human disease related to the consumption of such crops. Part II of Rule 17-610, F.A.C., "Reuse: Slow rate land application systems; restricted public access;" governs the type of sprayfield proposed by FCWC. Petitioners alleged that, due to the proximity of their groves and beekeeping activities, higher levels of treatment than those in Part II should be required. They argued that "advanced wastewater treatment" (AWT), defined in Section 403.086(4), F.S., would be more appropriate. This statute gives DER the discretion to require AWT when it deems necessary. Section 403.086(1)(a), F.S. However, AWT would not meet the requirements of Part III of Rule 17-610, which governs irrigation ("direct contact") of edible food crops and requires Class I reliability for treatment which is not required for AWT. Section 403.086(4), F.S.; Rule 17-610.460 and 17-610.475, F.A.C. Adjacent land uses were a part of the permit review for this project required in Part II. Buffer restrictions provide protection from the sprayfield so that levels of deposition are negligible compared to those when spray irrigation is applied directly at the food crop site. Thus, by its decision to issue this permit, DER recognized that minimal aerosol drift is not the "direct contact" envisioned in Part III and that because the project did not pose a hazard to adjoining groves higher levels of treatment are not necessary. Aerosol drift from treated effluent will have no effect on human health due to contamination of honey or adverse effects on the Shreve's bees located near the proposed sprayfield. Natural enzymes in unpasteurized honey are hostile to bacteria. The Shreves have never experienced a problem with the existing forty acre sprayfield even though it is accessible to their bees and has been in the area as long as the bees have. Petitioners allege that the sprayfield will attract birds, creating an aviation hazard to airplanes using the grass airstrip owned by Petitioner, Parrish Properties. Mr. Parrish, who is a licensed pilot, asserted that water ponding on the site and the mowing operation will attract birds. Both the proposed sprayfield and the surrounding groves will be mowed and irrigated and thus will provide the same type of mixed grass and citrus tree habitat as presently found in the groves. Therefore, Petitioners are currently attracting the same type and number of birds to their groves as FCWC's proposed sprayfield will attract. FCWC's expert in botany and ornithology, Mr. Noel Wamer, observed no large birds at the site, the existing 40-acre sprayfield or the surrounding citrus groves. He did observe small birds such as northern cardinals, towhees, and warblers, typical of citrus grove habitats. Cattle egrets might also be expected in the groves and the proposed sprayfield, particularly during mowing operations. Wading birds would only be attracted if water remained on the site for approximately one week or more to allow development of aquatic organisms as a food source. Birds present on the proposed sprayfield are very unlikely to fly up and collide with planes. The grass airstrip is used infrequently, with only 12 landings in the past year. For a number of years Mr. Wamer has observed bird behavior at the Tallahassee sewage treatment plant sprayfields near the Tallahassee Airport. The one-half mile distance between the runway and sprayfields in Tallahassee is nearly the same as the distance between the Petitioners' grass airstrip and the site. Planes landing at the Tallahassee airport are at an altitude of between 500 and 600 feet over the sprayfields, the same height as predicted over the site. Regardless of the size of planes, the birds, primarily cattle egrets, do not react, but continue feeding or resting. Stormwater and Surface Water Management Activities. On April 3, 1991, FCWC submitted an application with DER to modify and operate the existing stormwater and surface water management system on the sprayfield site (MSSW system). The Notice of Intent to Issue the MSSW Permit was published in the Florida Today newspaper on July 27, 1991. Minor activities are proposed to improve the existing system: (1) culverts at the ends of swales will be cleaned to restore full flow capacity; (2) obstructions and excess vegetation will be removed from the collection ditches to restore their original flow lines; and (3) any depressions in the swales will be filled and regraded to attain a minimum swale bottom elevation of 20.2 feet above mean sea level. As asserted by DER's expert in surface water management, the stormwater discharges will not be a combination of stormwater and domestic waste sufficient to trigger review of stormwater under DER rules as required by Rule 40C-42.061(3), F.A.C. Considering all proof adduced, particularly that stormwater will be treated to applicable standards in the grassed swales, water quality will not be violated, and the post- development peak discharge will not exceed the pre-development peak discharge from the site, FCWC provided reasonable assurances that the proposed MSSW system would not be harmful to the water resources in the area and would not be inconsistent with the overall objectives of the district. Summary of Findings and Permit Conditions FCWC has established that the sprayfield, as proposed, will meet the applicable regulatory requirements for the sprayfield and MSSW permits. Included in the specific conditions attached to the notice of intent to issue the sprayfield construction permit is the requirement that the site be operated to preclude saturated ground conditions or ponding. (FCWC Exhibit #3, paragraph 13, specific conditions). Witnesses for the applicant described certain proposals to assure this condition is met, and those proposals should be incorporated into the condition. Those proposals include the cessation of spraying during a rain event and the installation of devices to automatically turn off the sprinklers when rain occurs, the cessation of spraying whenever the groundwater level is within four inches of the bottom of the swales, and the installation of ground water gauges to determine when this level is reached. In order to minimize aerosol drift, the applicant proposes to establish wind gauges indicating the direction and speed of wind at the site. It was suggested that spraying would cease when the wind reaches 20 miles an hour, and sprinklers should be positioned to avoid spraying the downwind perimeter of the site when drift is likely to occur. This condition should also be incorporated in the permit. If the operational adjustments cannot be made automatically it will be necessary to require that the plant be staffed at all times that the spray system is turned on, notwithstanding the minimum six hours, five days a week required in Rule 17-602.370, F.A.C. and referenced in the intent to issue. Engineering computations in the application rely on the assumption that the vegetation onsite will be harvested (mowed and removed). Since spray irrigation treatment of wastewater depends on renovation or removal of effluent by the soil vegetation system, periodic mowing and removal of the vegetation should also be included as a permit condition.

Recommendation Based on the foregoing, it is hereby, RECOMMENDED: That a final order be entered issuing permits number DC05-194008 and MS05- 194894, with the additional conditions addressed in Finding of Fact paragraphs 60 and 61, above. DONE and RECOMMENDED this 27th day of May, 1992, in Tallahassee, Leon County, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 1992. APPENDIX TO RECOMMENDED ORDER The following constitute specific rulings on the findings of fact proposed by Petitioners, Groves and Shreve: Rejected as unsupported by competent evidence (as to the allegation of irresponsible plant operation). 2.-4. Rejected as irrelevant. 5.-7. Addressed in Conclusions of Law. Rejected as irrelevant. Adopted in paragraph 9. 10.-11. Rejected as contrary to the weight of evidence as to "irrigation efficiency". 12.-13. Rejected as contrary to the weight of evidence. Rejected as contrary to the weight of evidence and mischaracterization of the witness' testimony. Rejected as unnecessary. Rejected as statement of testimony, not finding of fact, which testimony is outweighed by other evidence. 17.-18. Adopted in paragraph 3. 19. Adopted in paragraph 28. 20.-21. Adopted in paragraph 8. 22.-23. Adopted in substance in paragraph 22. Rejected as contrary to the weight of evidence. Average annual application rate of .54 inches/week yields 28 inches a year. Rejected as unnecessary. Addressed in Conclusions of Law. 26.-29. Rejected as contrary to the weight of evidence. 30.-31. Rejected as unnecessary. Rejected as contrary to the weight of evidence. Adopted in paragraph 19. Adopted in paragraph 20. Adopted in paragraph 11. Adopted in paragraph 19. Addressed in paragraph 36; adopted in substance. 38.-39. Rejected as unnecessary. 40. Adopted in paragraph 31. 41.-47. Rejected as unnecessary, or contrary to the weight of evidence as to "irrigation efficiency". 48.-49. Rejected as cumulative and unnecessary. 50. Adopted in paragraph 34. 51.-52. Rejected as contrary to the weight of evidence. The grass will be mowed and removed. The "U" value was based on the grasses, not the citrus. 53. Rejected as contrary to the evidence, as to "unknown density and type". 54.-57. Rejected as unnecessary. Rejected as contrary to the evidence. Adopted in paragraph 7. Rejected as unnecessary. Rejected as contrary to the weight of evidence. Rejected as unnecessary. 63.-64. Rejected as contrary to the weight of evidence. 65. Rejected as confusing, as to the term "unsuitable conditions". 66.-69. Rejected as contrary to the evidence. 70. Rejected as confusing. 71.-72. Rejected as unnecessary. 73.-74. Rejected as a mischaracterization of the witnesses' testimony. 75.-82. Rejected as unnecessary. Rejected as contrary to the weight of evidence. 84.-85. Rejected as unnecessary. 86.-87. Rejected as contrary to the evidence. 88.-89. Rejected as unnecessary. 90.-94. Rejected as contrary to the evidence. 95.-97. Rejected as unnecessary. 98.-99. Addressed in Conclusions of Law. 100.-103. Rejected as contrary to the weight of evidence. 104.-109. Rejected as a mischaracterization of the testimony or misunderstanding of the term "irrigation efficiency". 110.-112. Rejected as cumulative and unnecessary. 113.-114. Addressed in Conclusions of Law. Rejected as unnecessary. Addressed in Conclusions of Law. 117.-118. Rejected as irrelevant. Rejected as contrary to the law and evidence. Rejected as unnecessary. Adopted in paragraph 16 by implication. Rejected as unnecessary and misunderstanding of the testimony. Addressed in Conclusions of Law. 124.-126. Rejected as unnecessary. Rejected as contrary to the weight of evidence. Adopted by implication in paragraph 21. 129.-130. Rejected as unnecessary. 131. Rejected as contrary to the evidence. 132.-134. Rejected as unnecessary. 135.-138. Rejected as contrary to the evidence. 139.-141. Rejected as unnecessary. COPIES FURNISHED: Kenneth G. Oertel, Esquire M. Christopher Bryant, Esquire OERTEL, HOFFMAN, FERNANDEZ & COLE, P.A. P. O. Box 6507 Tallahassee, FL 32314-6507 Harry A. Jones, Esquire EVANS, JONES & ABBOTT P.O. Box 2907 Titusville, FL 32781-2907 Kathleen Blizzard, Esquire Richard W. Moore, Esquire P.O. Box 6526 Tallahassee, FL 32314 Douglas MacLaughlin Asst. General Counsel Dept. of Environmental Regulation 2600 Blairstone Rd. Tallahassee, FL 32399 Daniel H. Thompson, General Counsel Dept. of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (5) 120.57373.413373.416403.0868.08 Florida Administrative Code (2) 40C-4.30140C-42.061
# 6
BAKER CUT POINT COMPANY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 80-000760 (1980)
Division of Administrative Hearings, Florida Number: 80-000760 Latest Update: Jan. 28, 1982

Findings Of Fact This hearing was occasioned by the Respondent's denial of (an) environmental permit(s) requested by the Petitioner, Baker Cut Point Company, a corporation owned by James C. Dougherty. The Respondent has asserted permit jurisdiction pursuant to Chapters 253 and 403, Florida Statutes, and attending regulatory provisions of Chapter 17, Florida Administrative Code. The Petitioner requested a formal hearing to consider the matters in dispute, and that hearing was conducted on the dates indicated before and in keeping with Subsection 120.57(1), Florida Statutes. The Petitioner owns land in Monroe County, Florida, identified as Buccaneer Point. This parcel of land is a peninsula which extends from the west side of Key Largo, Florida, and has as its essential features two interior lakes and well-defined mangrove stands to include red mangroves (Rhizophora mangle) and black mangroves (Avicennia germinans). This parcel of land is bordered on the north by Buttonwood Sound and on the south by Florida Bay, navigable water bodies. Respondent's Exhibit No. 1, admitted into evidence, depicts the present condition of the parcel of land, with the exception of proposals involved in the permit review process, which are the subject of this Recommended Order and the companion case of James C. Dougherty v. State of Florida, Department of Environmental Regulation, DOAH Case No. 80-1055. At present, the two lakes do not offer normal access to Buttonwood Sound and Florida Bay, nor do they offer an interior water connection between the two lakes. The southernmost lake does have intermittent water exchange with Florida Bay. Those lakes are identified as North Lake and South Lake. The Petitioner had initially applied for permission to place 75,000 cubic yards of clean limerock fill at the project site and indicated that the fill would be placed landward of the mean high water line. That fill would have covered approximately 17.56 acres in the residential subdivision. The application was made on October 27, 1978. See Petitioner's Exhibit No. 20, admitted into evidence. The Respondent issued an Intent to Deny the permit connected with that request, and that Intent to Deny was issued on April 3, 1980, asserting permit jurisdiction by the Respondent under the provisions of Chapters 253 and 403, Florida Statutes. See Petitioner's Exhibit No. 5, admitted into evidence. The Petitioner modified the permit application effective April 24, 1981. Under the terms of the revised permit application, the Petitioner would place limerock fill over 5.7 acres, including mangroves, constituting approximately 30,000 cubic yards of fill. Additionally, the applicant modified the permit request to include filling the exterior rim of the interior lakes to create a littoral zone and the placement of a berm at that exterior. See Petitioner's Exhibit No. 6, admitted into evidence. The project, as contemplated, allows for a preserve area of mangroves along the northern end of the peninsula and also employs a "pad" concept to preserve the mangrove acreage where fill is to be placed. Those "pads" for houses would be bordered by six- inch dikes to divert upland runoff which might find its way into the interior lakes on the property. The fill material to be placed in those areas, other than the lakes, would be placed above or landward of the line of mean high water, as determined by the mean high water line survey found in Petitioner's Exhibit No. 1, admitted into evidence, dating from December, 1975, and whose methodology was approved on January 15, 1980, for purposes of Chapter 177, Florida Statutes, through the offices of the State of Florida, Department of Natural Resources. This factual determination is also borne out by a review of the Petitioner's Exhibit No. 6, in pari materia with Respondent's Exhibit No. 1 and Petitioner's Exhibit No. 1. As the lakes are now constituted, the placement of the limerock fill at the fringe of the lakes would not be waterward of the line of mean high water; however, when the placement of this fill material is considered in view of the permit request made in Division of Administrative Hearings' Case No. 80-1055, which permit request attempts to open up the lakes by direct water connection to the aforementioned navigable water bodies, then the placement of the fill would be below the line of mean high water. See Petitioner's Exhibit No. 6. Therefore, treatment of the placement of fill for purposes of this case will be considered on a basis that the lakes remain landlocked and the matter of the placement of this fill will be a matter assumed in the Division of Administrative Hearings' Case No. 80-1055, dealing with an attempt to open those lakes by direct water connection to navigable waters of the State. Although the mangrove areas to be filled by the project are landward of the mean high water line, those mangroves are inundated by water at times and considered to be "submerged lands" adjacent to the State water bodies, Buttonwood Sound and Florida Bay. If the mangroves are removed, part of the ecosystem's ability to filter sediments and nutrients contained in stormwater runoff of adjacent upland areas and from tidal flows will be destroyed and will affect water quality considerations for adjacent open bay estuarine or marine systems. The extensive root system of the mangroves and associated vegetation assist in stabilization of estuarine shoreline sediments and attenuation of storm generated tides. Even though some of the mangroves in the proposed area for fill are in a stressed condition, i.e., a condition in which their growth is stunted, if left alone, those mangroves would flourish and provide the same water quality functions as healthy mangroves. A biologist presented by the Petitioner identified the number of mangrove species, the number of mangroves, the diameter of those mangroves and the height of canopies of the mangroves in areas of the project site. These items were summarized through the use of the Holdridge Complexity Index, which measures structural complexity of mangroves within the sites. See Petitioner's Exhibit No. 17, admitted into evidence. In particular, four such station pairs were studied and the pairs were constituted of a station within the basin of the mangrove stand and a station at the fringe of the mangroves. There was a site at each proposed waterway and a site at the northeastern and western points of the peninsula, the area of the proposed mangrove preserve. See Petitioner's Exhibit No. 6, admitted into evidence. This study indicated that fringe mangroves are more developed than the ones in the heart of the basins. This study also revealed that the upland fill would remove primarily black mangroves. The removal of the mangroves and placement of fill would be in furtherance of the creation of twelve to fourteen residential lots, the majority of which would be located on Florida Bay. See Petitioner's Exhibit No. 6. In furtherance of the intention to offer these lots for sale, the Petitioner has sold one of the lots on Florida Bay for $95,000 on or about June 2, 1981. If the proposed utilization of the property in question was not allowed, the Petitioner stands to lose money in his investment in the face of preliminary developmental expenses which, at present, exceed monetary returns from the sale of lots. The area in which the upland fill would be placed is porous limerock, which allows water to seep through and be transported underground to adjoining water bodies, both on site and off site, in addition to the runoff from the upland areas. To address these concerns, the Petitioner has planned for the installation of dikes in the various upland areas which are to be built to prohibit drainage into the remaining mangrove areas and ambient waters. The littoral zones around the edge of the inland lakes would promote marine and wetland vegetation which assists in the function of filtration of sediments and nutrients. On the subject of water quality considerations, the use of the clean limerock fill, which is calcium carbonate, would tend to stabilize seawater at its natural PH level, thereby allowing the specific conductance (measurement of salinity) of the lakes and surrounding ambient waters to remain in a natural state in terms of direct effects of the fill material. On the subject of contamination of water by copper, normally, seawater contains 3 micrograms per liter of copper. In a project such as this one, it is not expected that higher amounts of copper would be found, and the limerock contains only trace amounts of copper, if any. Specific testing done at the project site reveals less than 1 microgram per liter of copper in the North Lake and 4 micrograms per liter in the South Lake. Therefore, the activity is not expected to increase the levels of copper to the extent that measurements exceed 500 micrograms per liter in either the lakes or surrounding waters. In dealing with the substance of zinc, seawater contains as much as 30 micrograms per liter of zinc. Sampling by the Petitioner indicated 2 micrograms per liter in the North Lake and 8 micrograms per liter in the South Lake of that substance. The activity and the development is not expected to increase the levels of zinc to the extent that measurements exceed 1,000 micrograms per liter in either the lakes or surrounding waters. In sampling for lead content, the samples revealed less than 50 micrograms per liter of lead and the placement of limerock fill will not cause the amounts of lead in the lakes and surrounding waters to exceed 50 micrograms per liter. Testing for phenolic compounds at the site revealed that these materials were below established standards of the Respondent, and it is not expected that those standards will be exceeded through activities proposed in this permit process. The testing for oils and greases indicated less than 1 milligram per liter of oils and greases, which is below the State's standard of 15 milligrams per liter, and the activities proposed at the project site are not anticipated to exceed 15 milligrams per liter of oils and greases. Normal PH for coastal waters is 6 to 8.5, and the PH levels of the lakes and ambient waters in the area were in the range of 8, except for measurements done in the winter at the North Lake, where they were shown to be 7.5. The placement of limerock fill will not cause an imbalance in the pH readings. The activity as proposed will not add substances which are created by industrial or agricultural means or cause other discharges, colors or odors, or otherwise promote a nuisance condition in the ambient waters or the lakes. Measurement was made to toxic materials in the way of synthetics, organics or heavy metals. Those tests in the lakes and ambient waters showed heavy metals to be at low levels. There were no sources revealed of synthetics or organics. (The calcium carbonate found in the limerock fill would assist in breaking down lawn pesticides into phosphate.) In summary, the filling, as proposed, is not expected to promote the introduction of toxic substances into the lakes or surrounding waters. The placement of the clean limerock fill in the upland area is not expected to cause problems with turbidity in the lakes or ambient waters, which turbidity would exceed 50 Jackson Units above background. The filling will not affect dissolved, oxygen levels of the surrounding waters. Biochemical oxygen demand, the measurement of demand for oxygen of organic and chemical materials in the water, will not be influenced by the placement of the clean limerock fill related to surrounding waters. The limerock fill is not expected to introduce other oxygen demanding materials into the subject waters, such that dissolved oxygen levels would be lowered by BOD loading. There will be no problem with dissolved solids, in this instance, salts, due to the fact that calcium carbonate fill would not affect the dissolved solids in the ambient waters or in the lakes. Coastal water PH normally measures 6 to 8.5 and PH for open waters in the range of 1. Placement of calcium carbonate fill on the uplands would not cause the PH in the Class II waters in Everglades National Park, which is 300 feet east of Baker Cut Point, to vary above or below normal levels for either coastal or open waters. In addition, there would be no discharge of toxic substances from the calcium carbonate fill into the Class II waters herein described. Tests conducted in the vicinity of homesites utilizing septic tanks, and specifically as sampled in waters adjacent to Buccaneer Point and the subject lakes in a development known as Private Park and Buttonwood Sound , indicated less than one fecal coliform bacterium per 100 milliliters. See Petitioner's Exhibit No. 14, admitted into evidence. Anticipated setbacks for additional septic tanks to be associated with the buildup at the project site would be in keeping with the requirements of Monroe County, Florida, and harmful septic tank leachate is not expected to be a problem.

Florida Laws (5) 120.5717.56403.021403.086403.087
# 7
ARLINGTON EAST CIVIC ASSOCIATION, ET AL. vs. JACKSONVILLE TRANSPORTATION AUTHORITY AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 78-001875 (1978)
Division of Administrative Hearings, Florida Number: 78-001875 Latest Update: May 14, 1979

Findings Of Fact The proposed project is a six-lane, combination low and high level bridge crossing Mill Cove and the St. John's River in Duval County, Florida. The project entails construction of approximately 6,000 feet of low level trestle-type bridge structure and approach spans beginning on the south side of Mill Cove and extending across the Cove to the northern edge of Quarantine Island, an artificial spoil island; 3,000 feet of high level bridge crossing the main channel of the St. John's River; and northern approach spans touching down on Dame Point on the northern shore of the St. John's River. In order to construct the proposed project, JTA is required to obtain a water quality permit and certification from DER. JTA filed its application with DER, accompanied by supporting data, including several studies performed by professional consultants. After review of the application, DHR filed notice of its intent to issue the requested water quality permit and certification, and Petitioners filed a timely request for a hearing pursuant to Section 120.57(1) Florida Statutes, to oppose the issuance of the permit and certification. Petitioners are various groups and individuals concerned about water quality in the St. John's River and the Jacksonville area. Petitioners' standing to seek relief in this proceeding was stipulated by all parties. Construction of the project will result in: filling of approximately .07 acres of wetlands to construct the south abutment on the shore of Mill Cove; dredging of approximately 185,000 cubic yards of material from Mill Cove to create a 4,400 foot long, 190 foot wide barge access channel, with a five foot navigation control depth parallel to the low level portion of the project; temporary filling of approximately .3 acres of wetlands above mean high water on the south shore of Quarantine Island to provide construction access to the island, which area is to be restored upon completion of construction; construction of a diked upland spoil containment site approximately 31 acres in size above mean high water on Quarantine Island to retain all dredge spoil associated with the project; construction of a temporary dock at the northern end of Quarantine Island for access and staging purposes, which is to be removed on project completion; and filling of approximately 16,000 cubic feet of material waterward of mean high water for rip-rap protection around main piers in the St. John's River. Dredged materials will be removed by hydraulic dredges. The St. John's River and its tributaries have been designated Class III waters by DER in the project area. The project involves dredging below mean high water and filling above mean high water, and is a dredge-and-fill project for purposes of Chapters 403 and 253, Florida Statutes, and Chapters 17-3 and 17-4, Florida Administrative Code, and is regulated by DER. The project is an element in a proposed eastern bypass around the City of Jacksonville. It is expected that, as a result of the project, existing area industry will receive more efficient transportation service, commuter trip miles from southeastern Jacksonville to northern Jacksonville will be reduced, transportation routes to education facilities will be improved, and tourist traffic will be routed around downtown Jacksonville, reducing miles traveled to nearby beach resorts and thereby relieving downtown congestion. The benefits to costs ratio of the project appears positive and beneficial to Duval County and Jacksonville, in that for every dollar spent to construct the project, $2.80 could be returned to the community in the form of increased economic activity and more efficient transportation. Testimony clearly established that the state waters in the project area are currently severely degraded and are not likely to meet Class III water quality standards. Violations of Class III standards for dissolved oxygen and some heavy metals, such as mercury, presently exist as background conditions in the St. John's River and Mill Cove. Further, a water quality analysis performed by DER in the project area indicates high background concentrations of heavy metals and PCB's in both the water column and sediments in the project area. When the pro posed project is analyzed within the context of these existing background water quality conditions, it appears highly unlikely that any impact from the project will further degrade existing conditions. The project as currently designed includes plans for total containment of spoil material resulting from dredging activity on the upland portions of Quarantine Island. There will be no direct discharge of dredge $materials from this containment area into the receiving waters of the state. JTA performed a water and sediment analysis of the project area, the purpose of which was to determine the existence and concentrations of specific pollutants that could adversely impact Class III waters if reintroduced into the aquatic system. JTA employed a consultant whose analytical program was designed in consultation with DER and complied with all standard testing procedures required by Rule 17-3.03, Florida Administrative Code. This analysis identified three primary-project activities where control of toxic and deleterious materials was critical: turbidity control; upland spoil containment; and direct discharge of spoil water to state waters. Sediments in the Mill Cove area are extremely fine and may be resuspended in the water column in quantities that could violate state water quality standards if dredging is done improperly. It appears from the evidence that any turbidity problem can be avoided by employing silt curtains and hydraulic dredging during channel excavation. Silt curtains should adequately retain turbidity below levels which would violate state water quality standards, in view of the fact that the JTA study hypothesized a "worst-case" condition for projecting turbidity and pollutant concentration by assuming no upland spoil containment, silt curtains or reasonable mixing zone. Although use of silt curtains and hydraulic dredging cannot absolutely guarantee zero-discharge of suspended sediments from the dredging area, the proposed system of turbidity control is adequate to provide reasonable assurance of non-violation of state water quality standards. Due to the existing toxic background conditions in Mill Cove, DER imposed a permit condition requiring spoil from dredging activities to be completely contained in an upland landfill-type site, with no overflow that could allow effluent to return to waters of the state. The upland dike system proposed in the project application is designed to retain all spoil material and water without direct discharge into state waters. Testimony established that the proposed dike system is designed to hold far more spoil material than the proposed project will generate. Although the dike system is to be constructed from dredged material previously deposited on Quarantine Island, it appears from the testimony that these materials were dredged from the main channel of the St. John's River and are cleaner and sandier in character than sediments in the Mill Cove area. The dike system, in conjunction with natural percolation and evaporation, is adequately designed to retain dredge spoil on the upland portion of Quarantine Island, and can reasonably be expected not to release toxic and deleterious substances into receiving waters of the state. It is also significant that a condition of the requested permit requires project water quality monitoring to afford continuing assurance that the project will not violate standards contained in Chapter 17-3, Florida Administrative Code. These standards and the conditions required to achieve them have been included in DER's letter of intent to issue the permit for this project. It is specifically concluded from the evidence that project dredging will not release toxic and deleterious substances into Class III waters in violation of state water quality standards, and that project dredging in Mill Cove incorporates reasonable safeguards for spoil disposal and turbidity control so as to assure non-violation of state water quality standards. JTA plans to use a direct discharge method to dispose of storm water from the bridge. Storm water will fall through 4-inch screened holes called "scuppers" placed at regular intervals along the bridge surface directly into either Mill Cove or the St. John's River. JTA was required to provide in its application reasonable assurance that storm water runoff from the Project would not exceed applicable state standards for turbidity, BOD, dissolved solids, zinc, polychlorinated biphenols, lead1 iron, oils or grease, mercury, cadmium and coliform. To this end, JTA submitted a study entitled Effect of Rainfall Runoff from Proposed Dame Point Bridge on Water Quality of St. John's River. This study analyzed the chemical composition of storm water runoff from an existing bridge, comparable in both size and design, to the proposed project, which crosses the St. John's River south of the City of Jacksonville. This study adequately established that storm water runoff into the St. John's River across the length of the proposed bridge will not degrade the water quality of the St. John's River below current water quality standards. All but three of the parameters tested in the study were within standards contained in Chapter 17-3, Florida Administrative Code. The remaining three pollutants were either not automobile-related, or would not violate applicable water quality standards after a reasonable opportunity" for mixing with receiving waters. One of these pollutants, mercury, is not automobile-related, and the concentration of mercury discovered in bridge runoff test samples was essentially the same as that measured in rainfall samples. The sampling for mercury was performed using the ultrasensitive "atomic absorption" method, which is capable of measuring tenths of a part per billion of mercury. Another method, the "Dithizone" method, is a technique recognized as effective by DER, and would have, if utilized, yielded a result within the "none detectable" standard contained in Rule 17-3.05(2) , Florida Administrative Code. As to the remaining two pollutants, coliform and lead, testimony established that a dilution rate of 400 to 1, after mixing with receiving waters, would not result in violation of applicable Class III water standards. Testimony also clearly established that water circulation in the project area would result in the requisite dilution ratio of approximately 400 to 1. The storm water runoff study was performed on a bridge similar in all important characteristics to the proposed project, and therefore validates the scientific methodology utilized to determine the expected impact of runoff from the proposed project on water quality in the St. John's River. The applicant has provided in its permit application the best practicable treatment available to protect state waters in the design of both the low and high level portions of the proposed bridge. Extensive research and analysis of design alternatives for both the low and high level portions of the bridge were undertaken by JTA and its consultants prior to selecting the proposed design for the bridge. JTA prepared and submitted to DER, as part of the application process, a document entitled Summary of Construction Techniques in Mill Cove, Dame Point Expressway. This document analyzed and summarized the available construction and design alternatives for the low level trestle portions of the project. The analysis included consideration of overhead construction, construction from a temporary wooden structure parallel to the project, and construction from barges using a shallow channel parallel to the project. The design chosen will cost more than one million dollars less than the next alternative, and will cut construction time by two years over the next alternative design. Given the demonstrated need for the proposed project, the already degraded water quality in the project area, the safeguards for water quality contained-in the project design, and the savings to be realized in both cost and time of construction, the design presently contained in the application is the best practicable. Both Petitioners and JTA have submitted proposed findings of fact. Petitioners' Proposed Findings of Fact numbered 1 through 4 have been substantially adopted herein. JTA's Proposed Findings of Fact numbered 1 through 7 have also been substantially adopted. To the extent that proposed findings of fact submitted by either Petitioners or JTA are not adopted in the Recommended Order, they have been specifically rejected as being either irrelevant to the issues in this cause, or as not having been supported by the evidence.

Florida Laws (5) 120.54120.57403.021403.061403.087
# 8
CONSERVANCY OF SOUTHWEST FLORIDA vs G.L. HOMES OF NAPLES ASSOCIATES II, LTD., AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 06-004922 (2006)
Division of Administrative Hearings, Florida Filed:Lauderdale Lakes, Florida Dec. 05, 2006 Number: 06-004922 Latest Update: Jul. 18, 2007

The Issue The issue in this case is whether the South Florida Water Management District (SFWMD, or District) should issue a Modification to Environmental Resource Permit (ERP) No. 11- 02055-P, Application No. 060713-9, to G.L. Homes of Naples Associates II, Ltd. (G.L. Homes, or Applicant), which authorizes modifications to the surface water management system (SWMS) for a residential development known as Saturnia Falls (the Project).

Findings Of Fact PARTIES The District is a water management district with the power and duty to exercise regulatory jurisdiction over the administration and enforcement of ERP criteria, pursuant to the provisions of Part IV, Chapter 373, Florida Statutes, and Title 40E, Florida Administrative Code, and Sections 373.413, 373.414, and 373.416, Florida Statutes. G.L. Homes is an entity with the administrative, legal, and financial capabilities of undertaking the activity in accordance with the terms and conditions of the 2006 ERP, meeting the criteria in Rule 40E-4.301(1)(j). The Conservancy was duly incorporated in 1966 under the laws of the State of Florida as a not for-profit corporation and has it headquarters in Collier County, Florida. G.L. Homes contests the Conservancy's assertion of "associational standing." But there is no question as to the Conservancy's "citizen standing" under Section 403.412(6), Florida Statutes. The Conservancy has approximately 6,200 members, with approximately 4,200 residing in Collier County. Twenty-five current members in good standing who reside in Collier County were identified during the hearing. The Conservancy's purpose is to "protect and sustain the natural environment of southwest Florida through advocacy, education, research, land acquisition and other lawful means." Specific purposes relevant to the subject matter of this case include: "to acquire and protect sanctuaries, greenbelts, parks, and beaches"; "to assist governing bodies to remedy present pollution and to prevent future pollution of water, air, and our waterfronts and beaches"; and "to encourage and stimulate the interests of residents and visitors to the area, to increase their knowledge of, and to promote the preservation of the southwest Florida natural environment." The Conservancy also asserts standing under Section 403.412(5), Florida Statutes. In furtherance of its corporate purpose, the Conservancy owns approximately 300 acres of land for preservation in Collier County, including a 46-acre parcel located on the Cocohatchee River downstream from the proposed Saturnia Falls development. The Conservancy also conducts scientific research in the waters of the Wiggins Pass Estuary downstream from the proposed Saturnia Falls development, including water quality monitoring and research on seagrass restoration. Further impacts to the water quality in the Cocohatchee River would affect the value of the Conservancy's property for conservation and would affect its interests in research in the area. These interests of the Conservancy would be adversely affected if the 2006 ERP were issued improperly. The Conservancy's assertion of "associational standing" is based on the testimony of eight of its members who engage in various recreational activities, including boating, fishing, bird-watching, nature study, and observation of wildlife. Some visit Corkscrew Swamp Sanctuary and the Corkscrew Regional Ecosystem Watershed (CREW) to view endangered wood storks and other wildlife. Some also visit and recreate in downstream waters, such as the Wiggins Pass Estuary, for fishing, boating, or wildlife observation. These interests would be adversely affected if the 2006 ERP were issued improperly. PROJECT DESCRIPTION AND PERMITTING HISTORY The Project site is located one mile north of Immokalee Road, approximately 2 miles east of 1-75 and lies near the CREW lands in Collier County. The entire Project site consists of approximately 646 acres, of which 533.1 acres are wetlands. The Project has a permitting history dating back to 1997, when the previous owner, Robert Vocisano, applied to construct a development called Wildewood Lakes. The Wildewood Lakes application was denied in 1998, at least in part because wetland impacts were not reduced and eliminated to the extent practicable, and was mediated pursuant to Section 120.573, Florida Statutes. After three years of responding to additional requests for information, the application was submitted to the Governing Board for approval in May 2002. This ERP, referred to as “the 2002 ERP,” authorized the construction and operation of a SWMS to serve a residential and golf course development, discharging to the Cocohatchee Canal via a conveyance channel/Flow-way known as the Mirasol Flow-way (Flow-way). The Flow-way feature was to be built on lands owned by three different property owners, one of whom was the owner of the Terafina Project, and was intended to address flooding and storage criteria in the BOR and alleviate flooding problems in the region that resulted from previous drainage and development projects that altered the natural sheet-flow through the region to the Cocohatchee and Imperial Rivers, and on to the Gulf Coast. As reported in the Staff Report for the 2004 ERP, studies current at the time indicated that, during the initial part of the rainy season, the wetland systems in the vicinity of the proposed Flow- way carried the flow between the Corkscrew Swamp and the Cocohatchee Canal with the peak stages contained with the limits of the wetland areas. However, as the wet season progressed, the wetland vegetation impeded the conveyance of flow and resulted in elevated water stages that inundated properties adjacent to those wetlands, including portions of the eastern half of the Project. There were approximately 288 acres of direct impacts to wetlands under the 2002 ERP. There was a total of 291.20 acres of onsite preserve, including 259.97 acres of wetlands and 31.23 acres of uplands. Part of the Flow-way was to be located within the eastern third of the property (225.74 acres, including 217.80 acres of wetlands and 7.94 acres of uplands), which would be preserved after construction of part of the Flow- way in 23 of those acres. There also would be off-site mitigation in the form of a payment of $1,232,000 "specifically for the purchase of 154 acres . . . of land within CREW, a project within the District's Save Our Rivers Program." Of that total, $712,404 was to be deposited in an account for the land purchase, $437,206 in an account to pay for restoration work within the CREW project, and $82,390 in an escrow account for general operations and maintenance costs incurred by the District within the CREW project. On March 10, 2004, the Governing Board approved a modification to the 2002 ERP authorizing the construction and operation of the Project, at the time known as the Terafina PUD. This ERP is referred to as “the 2004 ERP.” The 2004 ERP removed the golf course and proposed a residential development within the same 646-acre parcel. It also discharged to the Cocohatchee Canal via the Flow-way. The 2004 ERP modified the Project to consist of: single-family residential areas; a recreation area; internal roadway; onsite wetland preserve areas within the development of approximately 73.99 acres; and 210 acres of wetland preserve east of the development, which included the Flow-way, and is referred to as the Eastern Preserve. The 2004 ERP proposed to impact approximately 280 acres of wetlands, slightly less than in the 2002 ERP. To mitigate for the impacts, the 2004 ERP authorized onsite mitigation consisting of the preservation and enhancement of 253.04 acres of wetlands, preservation of 31.27 acres of uplands, creation of 0.1 acres of wetlands, and offsite mitigation by a payment to the District for the purchase, restoration, and management of lands in CREW. Apparently by mistake, the amount of the CREW payment was reduced to $1,001,000, with $418,404 to go into the purchase account, $437,206 to go into the restoration account, and $82,390 to go into the escrow account for general operations and maintenance. In addition, the time for deposit of the funds was extended to June 30, 2004. The District included Special Condition No. 18 in the 2004 ERP, delaying any construction under the 2004 ERP until the Flow-way was completed. However, the United States Army Corps of Engineers (ACOE) refused to permit construction of the Flow-way. On July 13, 2006, G.L. Homes submitted an application to modify the 2004 ERP (the 2006 Application), which is the subject of this proceeding. (A letter modification was issued on October 5, 2006, authorizing installation of a 48" outfall pipe within the Logan Boulevard right-of-way to convey the discharge from the Project to the Cocohatchee Canal. This letter modification was not challenged by the Conservancy and is not at issue in this proceeding.) On November 9, 2006, SFWMD proposed issuance of the 2006 ERP authorizing the construction and operation of the residential development now known as Saturnia Falls (the 2006 ERP). The 2006 Staff Report proposes elimination of the Flow- way, and enhancement and preservation of the 23.5 acres that would have been located in the eastern third of the Project area, similar to the rest of the Eastern Preserve. The SWMS also was altered, and the Staff Report noted that the CREW payment was made in June 2004 in the amount of $1,260,000 "as funding for the off-site mitigation in CREW," which was said to have "provided a substantial amount of up-front mitigation in CREW." The Conservancy did not challenge the 2002 ERP or the 2004 ERP but did challenge the 2006 ERP. THE MODIFIED SURFACE WATER MANAGEMENT SYSTEM In addition to removal of the 23.5-acre segment of the Flow-way from the Eastern Preserve, the current proposal would modify the SWMS under the 2004 ERP by replacing the 80-foot weir at Lake 9, which was the sole final outfall under the 2004 ERP, with two operable Water Control Structures (WCS), located at the eastern (WCS-2) and western (WCS-1) boundaries of the Project, as the final outfall structures. The 80-foot weir in the 2004 ERP consisted of a rectangular notch in the 17.7 foot NGVD berm between Lake 9 and the Eastern Preserve, with a crest elevation of 13.8 foot NGVD and a 5 foot wide, .4 foot deep rectangular notch (that is, with an invert elevation of 13.4 foot NGVD) within the 80-foot weir, which served as a bleeder for water quality. The structure was fixed, and water was to pass freely through the bleeder and over the weir depending on the water levels on either side of the structure. In contrast, the structures proposed in the 2006 ERP are operable based on water levels in the Eastern Preserve. WCS- 1 is located in Lake 4 and discharges to the Cocohatchee Canal via a 48" reinforced concrete pipe located in the Logan Boulevard right-of-way. WCS-2 is located to the east of the development and discharges to the Eastern Preserve and then ultimately to the Cocohatchee Canal. As modified under the 2006 ERP, the SWMS continues to consist of eleven controlled sub-basins with a total area of 397.46 acres. The remainder of the proposed Project also is the same as under the 2004 ERP, including road alignments, type and number of houses, lots, lakes and grading information, and wetland impacts. It is the position of the Applicant and the District that the mitigation proposal also is identical; but Petitioner takes the position that proposed onsite mitigation will be adversely affected by the proposed modifications and that offsite mitigation no longer has the same benefit, so that mitigation no longer fully offsets the wetland impacts. The SWMS is set at the control elevation of 13.4 feet NGVD, which represents the wet season water table (WSWT) for the currently existing wetlands. The seasonal high water level for the wetlands was determined to be approximately 14.0 feet NGVD. When water levels in the Eastern Preserve are below 14.00 feet NGVD (typically in the dry season), the SWMS discharges to the Eastern Preserve through WCS-2, which is located in the perimeter berm to be constructed with sloping banks and a crest elevation of 17.7 feet NGVD between the Eastern Preserve and one of the western wetland preserves, called preserve P-5. WCS-2 consists of a 23-foot weir fitted with an operable bleeder at the control elevation of 13.40 feet NGVD, and a fixed discharge V-Notch weir with an invert elevation of 14.20 feet NGVD, and a crest elevation of 15.40 feet NGVD. This discharge will flow southerly through the Eastern Preserve to the receiving waterbody, the Cocohatchee Canal. WCS-1 will be closed during these periods. The maximum discharge rate under these conditions will be 15.28 cubic feet per second (cfs) to the Eastern Preserve. Based on the hydraulic modeling results, the Eastern Preserve experiences levels below 14 feet NGVD approximately 70% of the time on an annual basis. When water levels in the Eastern Preserve are above 14.00 feet NGVD (typically in the wet season), the SWMS will discharge predominately to the west via WCS-1 to the Cocohatchee Canal. When the water level in the Eastern Preserve reaches 14.00 ft NGVD, the operable bleeder on WCS-2 will close and the operable bleeder/discharge structure on WCS-1 will open. During the 25- year 3-day storm, the maximum discharge rate through WCS-1 is 13.50 cfs. During these conditions, discharge will also occur through the fixed 60-degree V-notch in WCS-2, with a maximum discharge of 2.10 cfs, ensuring bidirectional flow of water so long as the water level in the SWMS stays above 14.20 feet NGVD. The total discharge rate from both structures under this condition is 15.61 cfs. During the 25-year 3-day storm event, water levels in the Eastern Preserve fluctuate from 13.40 feet NGVD to 15.31 feet NGVD. When the water levels in the Eastern Preserve are higher than 14.20 feet NGVD, and the water level in the SWMS is lower than 14.20 feet NGVD, water from the Eastern Preserve will enter into the SWMS through the 60-degree V-Notch in WCS-2. The SWMS is designed to receive water from the Eastern Preserve to provide flood storage and hydrology to the onsite wetlands within the development. THE ERP PERMITTING CRITERIA In order to obtain an ERP, an applicant must satisfy the conditions for issuance set forth in Rules 40E-4.301 and 40E-4.302. In this case, the evidence must be viewed under Rule 40E-4.331(2)(a), pertaining to modification of permits, which requires the District to review permit modification applications “using the same criteria as new applications for those portions of the project proposed for, or affected by, the modification.” The test in this case is not whether the District properly evaluated the 2004 ERP, but whether the areas proposed to be modified or affected by the modification meet the applicable conditions for issuance. Rule 40E-4.301(1) requires an applicant to provide reasonable assurance that the construction, alteration, operation, maintenance, removal or abandonment of a SWMS: Will not cause adverse water quantity impacts to receiving waters and adjacent lands; Will not cause adverse flooding to on- site or off-site property; Will not cause adverse impacts to existing surface water storage and conveyance capabilities; Will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters; Will not adversely affect the quality of receiving waters such that the water quality standards set forth in Chapters 62- 4, 62-302, 62-520, 62-522, 62-550, F.A.C., including any antidegradation provisions of paragraphs 62-4.242(1)(a) and (b), subsections 62-4.242(2) and (3), and Rule 62-302.300, F.A.C., and any special standards for Outstanding Florida Waters and Outstanding National Resource Waters set forth in subsections 62-4.242(2) and (3), F.A.C., will be violated; Will not cause adverse secondary impacts to the water resources; Will not adversely impact the maintenance of surface or ground water levels or surface water flows established pursuant to Chapter 373.042, F.S.; Will not cause adverse impacts to a work of the District established pursuant to Section 373.086, F.S.; Will be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed; Will be conducted by an entity with the sufficient financial, legal and administrative capability to ensure that the activity will be undertaken in accordance with the terms and conditions of the permit, if issued; and Will comply with any applicable special basin or geographic area criteria established in Chapter 40E-41, F.A.C. The parties stipulated that the Project either complies with Rules 40E-4.301(1)(g),(h),(j), and (k), and Sections 4.3.8, 7.5, and 9.0 of the BOR, or that those rules are not applicable. THE SURFACE WATER MANAGEMENT CRITERIA Water Quantity (Rule 40E-4.301(1)(a)) As indicated, the 2006 modifications eliminate the Flow-way and change the manner in which water flows in and out of the proposed SWMS. Otherwise, there are no changes to the engineered features of the SWMS. Rule 40E-4.301(1)(a) requires that G.L. Homes demonstrate that the Project will not cause adverse water quantity impacts to receiving waters and adjacent lands, and not exceed the capacity of the downstream receiving water bodies. Section 6.2 of the BOR requires that a project be designed so it is consistent with the downstream carrying capacity of the receiving waters. The receiving waterbody for this Project is the Cocohatchee Canal. The allowable discharge rate for the Cocohatchee Canal is 15.9 cfs. The Project’s calculated rate of discharge is 15.6 cfs, so the Project does not exceed the allowable discharge rate. The Project's discharge rate is lower in 2006 (15.6 cfs) than it was in the 2004 ERP (291 cfs). Petitioner argued that the significant difference in discharge rates between the 2006 and the 2004 ERPs violated the District’s water quantity criteria. But the discharge rate calculated in 2004 was associated with the Flow-way and entailed a different overall analysis for the entire area served by the Flow-way. G.L. Homes provided reasonable assurances that the discharge rate allowed for its Project would not be exceeded, as required in Section 6.2 of the BOR. G.L. Homes complied with Section 6.3 of the BOR which requires the 25-year, 3-day storm event to be used when computing the discharge rate for the Project. Section 6.8 of the BOR is entitled “Offsite Lands.” Compliance with this Section requires that a project allow the passage of drainage from offsite areas to downstream areas, which is necessary to demonstrate that off-site receiving waterbodies are not being adversely affected. G.L. Homes complied with Section 6.8 by conducting a hydrologic analysis, using the 25-year, 3-day storm event, which demonstrated that discharge would be directed to WCS-1 and WCS-2, allowing for the passage of drainage from offsite areas to the downstream areas. Section 6.10 of the BOR requires that the design of the Project conserve water and not over-drain wetlands. There is nothing about the modifications that violate Section 6.10. In this case, the control elevations have been set at 13.4 feet NGVD, which is the average WSWT. The WSWT was established using biological indicators to determine the average elevation in the Project’s wetlands during the wet season. Setting the control elevation at the WSWT does not violate Section 6.10. To the contrary, when water levels are at or above the control elevation, the design helps prevent the wetlands from being drawn down below 13.4 feet NGVD, and not over-drain them. The WSWT of 13.4 was permitted in the 2004 ERP. The structures also allow for the interchange of water from the Eastern Preserve into the preserve wetlands within the SWMS. This exchange of water helps preserve the Project’s environmental values. Setting the control elevation at 13.4 also reduces unnecessary runoff from the Project, retaining the water for recharge. In addition, the ability of the SWMS to accept flows from the Eastern Preserve also conserves freshwater by preventing that water from being discharged downstream. As indicated, when water levels in the Eastern Preserve are below the control elevation, no water will enter the SWMS from the Eastern Preserve. During those times, it is possible that wetlands within the SWMS will be drained into the deep lakes dug as part of the project. However, that would not be the result of 2006 modifications but would be inherent in the previously-approved SWMS. The 2006 modifications do not re-open the soundness of that previously-approved part of the design. Section 6.10 also requires that a project not lower water tables so that the existing rights of others would be adversely affected. Again, by setting the control elevations at the WSWT, the water table is not expected to be lowered so as to affect the existing rights of others. The Project also must demonstrate that the site’s groundwater recharge characteristics will be preserved through the design of the SWMS. G.L. Homes complied by setting the control elevations at the WSWT, allowing standing water in the wetland preserves to recharge the groundwater. Section 6.11 addresses Detention and Control Elevations which are intended to assist in complying with the provisions of Section 6.10. By designing WCS-1 and WCS-2 at control elevation 13.4, the Project maintains the detention component and the control (wetland protection) elevations under the previously-approved SWMS. The Required Design Information and Assumptions are contained in Section 8.0 of the BOR. This Section includes various assumptions and information regarding the design of the SWMS. By incorporating these assumptions into the Project, G.L. Homes complied with Section 8.0. Flooding (Rule 40E-4.301(1)(b)) This Rule requires G.L. Homes to demonstrate that the Project will not cause adverse flooding to onsite or offsite property. Section 6.4 requires that building floors be designed to be protected from a 100-year, 3-day storm event. G.L. Homes complied with this provision by providing construction plans demonstrating that the building floors are being built higher than the 100-year, 3-day storm event. Likewise, Section 6.5 pertains to providing flood protection for the Project’s roads and parking lots. G.L. Homes complied with this provision by exceeding the District’s 5-year design criteria, and instead designing the roads and parking lots using the 25-year, 3-day storm event. G.L. Homes was required to comply with the Historic Basin Storage provision in Section 6.7, which requires the Project to replace or otherwise mitigate the loss of historic basin storage provided by the site. In this case, the amount and extent of historic storage that is being displaced by the 2006 ERP is the same as that in the 2004 ERP. However, the replacement or mitigation for loss of historic basin storage is reduced due to elimination of the Flow-way. Instead of relying on the Flow-way to address this criterion, G.L. Homes relied on the “Saturnia Falls Slough Hydraulic Study” prepared by Taylor Engineering, the “Taylor Report” (RJ Ex. 32), which demonstrates the current flood levels in the Eastern Preserve and other adjacent properties and wetlands, and that the Project’s configuration would not affect the basin’s historic storage. Lastly, to demonstrate that the Project will not cause adverse flooding to offsite properties, G.L. Homes was required to comply with Section 6.9, Minimum Drainage. This provision requires that the SWMS recover, consistent with the environmental criteria in 6.10 of the BOR, within 12 days or less. The Taylor Report also demonstrated that the Project will recover from the design storm event in time to provide the required attenuation for the next storm event, while preserving environmental or wetland features. There may be times when the recovery may exceed 12 days, but the need to protect the hydrology of the wetlands required the control elevations to be set at 13.4 ft NGVD. Balanced against Section 6.10, G.L. Homes still complies with Section 6.9. Accordingly, G.L. Homes provided reasonable assurances demonstrating that the 2006 ERP will not cause adverse flooding to on-site or off-site property, satisfying Rule 40E- 4.301(1)(b). Storage and Conveyance (Rule 40E-4.301(1)(c)) Rule 40E-4.301(1)(c) requires that an applicant demonstrate that the proposed development will not adversely impact existing surface water storage and conveyance capabilities. In order to accomplish this demonstration, applicants are to consider the capability of the adjacent properties to both store and convey stormwater runoff from their developments. Section 6.6 of the BOR, entitled Floodplain Encroachment, specifies the parameters by prohibiting a net encroachment into the floodplain, between the average WSWT and the 100-year event, which will adversely affect the existing rights of others. G.L. Homes addressed this criterion through the analysis submitted and contained in the Taylor Report. The Taylor Report used the hydrologic model, HEC-HMS, and hydraulic model, HEC-RAS, to provide a simulation of flood stages propagating through the Eastern Preserve and the adjacent wetland system. This analysis assessed the existing flood stages within the offsite areas, starting at the Cocohatchee Canal and ending approximately 2-3 miles northeast of the eastern boundary of the Project. The analysis captured the expected flood levels during both the 25-year, 3-day and the 100-year, 3-day storm events in the area's current condition, and then compared the analysis of the two storm events considering the Project in its development condition. The analysis relied on the Project’s proposal to remove the current melaleuca infestation from the Eastern Preserve as part of the Project’s post-development condition. The Taylor Report concluded that the removal of such exotics would remove a flow impediment and allow the water to flow through the Eastern Preserve at a higher rate, and therefore at lower flood stages. The Taylor Report made these conclusions while accounting for the development as well as the mitigation-required plantings. The Taylor Report, along with Mr. Hull’s testimony, demonstrated that even with the mitigation reaching full maturity, the removal of melaleuca results in lower flood stages than the study area is currently experiencing. The evidence was that the model used by Taylor Engineering, the HEC-RAS model, is an appropriate model to determine flood stages and to calculate the floodplain conveyance. Furthermore, although Petitioner attacked the choice of inputs, mainly the “Manning’s n coefficients” used to determine the roughness or the friction provided by current and post-development vegetation, the balance of the evidence supports the coefficients contained in the Taylor Report as reasonable and within the ranges of the cited data and models. Petitioner’s expert, Dr. Van Lent, who conducted no analysis of his own, admitted that HEC-RAS was an accepted tool to use for floodplain conveyance and that the other models he suggested are either inappropriate or rarely used by ERP applicants. The Applicant provided reasonable assurances demonstrating that the 2006 ERP will not cause adverse impacts to existing surface water storage and conveyance capabilities, satisfying Rule 40E-4.301(1)(c). However, that is not to say that the 2006 ERP replaces the storage and conveyance capabilities that would have been provided under the 2004 ERP with the proposed Flow-way, which also required removal of melaleuca and required the same mitigation plantings except within the Flow-way itself. To the contrary, storage and conveyance capability under the 2004 ERP clearly would have been greater. Wetland Impacts (Rule 40E-4.301(1)(d)) This Rule provision, while typically associated with the wetland ERP criteria review, also applies to the SWMS through Section 6.12 of the BOR, which requires that a lake system be designed so that an adverse gradient is not created between the lakes and wetland areas. G.L. Homes complied with this criterion by setting the control elevation at 13.4 feet NGVD, the WSWT, for the lake system, the SWMS wetland preserves and the Eastern Preserve, ensuring no gradient (or difference in elevation) between the wetland elevation and the lake elevation. Petitioner argued that additional analysis regarding the timing and levels of inundation in the wetland preserves is necessary to fully determine the impacts to the wetlands. Contrary testimony indicated that setting the control elevations within the development area at the WSWT protects the onsite wetlands and ensures that those wetlands will function as expected. Mr. Waterhouse testified that additional analysis, such as groundwater or evapotranspiration, is not necessary because the Project was designed so that the control elevation that affects the lake levels and the wetlands are the same. The testimony was that, since the control elevation was set using the WSWT, the timing and levels within the wetlands will not be affected by the revised SWMS, and that no additional modeling, as recommended by Dr. Van Lent, is necessary because the SWMS complies with Section 6.12. As indicated, it is questionable on this record whether wetlands within the SWMS will be drained during dry conditions by adjacent deep lakes. No such analysis was presented in evidence in this case. However, such an impact on the wetlands within the SWMS would not be the result of 2006 modifications but would be inherent in the previously-approved SWMS. The 2006 modifications do not re-open the soundness of that previously-approved part of the design. As for the 2006 modifications, the evidence was persuasive that no additional analysis regarding the timing and levels of inundation in the wetland preserves is necessary to determine that the elimination of the 80-foot weir and its replacement with WCS-1 and WCS-2 will not impact the wetlands. Water Quality (Rule 40E-4.301(1)(e)) Rule 40E-4.301(1)(e) requires an applicant to provide reasonable assurances that the Project will not adversely affect the quality of receiving waters such that water quality standards will be violated. Section 5.2 describes the District’s standard water quality criteria. This provision, requiring a minimum of one inch detention of stormwater, is referred to as a “presumptive criterion” because it is presumed that if an applicant provides the required one inch of detention, Class III water quality standards and rule requirements will be met. In this case, G.L. Homes provides one inch of detention in its lake system in the exact manner it did in the 2004 ERP. A difference from the 2004 to the 2006 ERP is the classification of the Cocohatchee Canal, the Project’s receiving waterbody, as impaired for iron and dissolved oxygen (DO). Therefore, G.L. Homes was also required to comply with Section 4.2.4.5 of the BOR to demonstrate that it is not contributing to the impairment. See also Fla. Admin. Code R. 40E-4.301(2). Section 4.2.4.5, entitled "Where Ambient Water Quality Does Not Meet State Water Quality Standards," states as follows: If the site of the proposed activity currently does not meet state water quality standards, the applicant must demonstrate compliance with the water quality standards by meeting the provisions in 4.2.4.1, 4.2.4.2, and 4.2.4.3, as applicable, and for the parameters which do not meet water quality standards, the applicant must demonstrate that the proposed activity will not contribute to the existing violation. If the proposed activity will contribute to the existing violation, mitigation may be proposed as described in subsection 4.3.1.4. To comply, G.L. Homes must show that neither short- term (4.2.4.1) nor long-term (4.2.4.2) water quality impacts will occur. G.L. Homes complied with the short-term requirements by submitting the Construction Pollution Prevention Plan (CPPP), detailing how water quality will be protected during the construction process. In addition to the inch of treatment, the long-term water quality requirement was addressed, in part, by the Urban Stormwater Management Plan (USMP), which details various source controls or best management practices (BMPs) to be implemented once the Project is built and operating. These BMPs help keep pollutants out of the lake system. In addition to the BMPs, the USMP requires G.L. Homes to institute a water quality monitoring plan and submit results to the District for review after the Project is developed. Dr. Harper concurred with Petitioner that the USMP as proposed (in R.J. 28, § 6.0) was deficient in certain respects and recommended that it be clarified or supplemented to specify testing for oxygen, iron, nitrogen, phosphorus, hardness, and a few heavy metals, namely copper, lead, and zinc. Dr. Harper also concurred and recommended that that samples should be collected at both WCS-1 or WCS-2, not just at one of them, depending on which structure is discharging water at the time of sampling. (Dr. Harper confirmed the propriety of testing three times per year, which is a common frequency for monitoring in situations like this.) Mr. Waterhouse agreed with Dr. Harper's additions/clarifications and testified that the USMP, as supplemented and clarified, would comply with District’s criteria. G.L. Homes accepted Dr. Harper's additions/clarifications to the USMP. Another component of Section 4.2.4.5 requires additional assurance for parameters that do not meet water quality standards. The District prepared the “Terrie Bates Water Quality Memo dated June 11, 2004,” referred to as “the Bates Memo,” to provide guidance on the implementation of Section 4.2.4.5 for projects which discharge into an impaired waterbody. The Bates Memo suggests that an additional 50 percent of treatment, among other BMPs, be incorporated into a SWMS. G.L. Homes complied with the Bates Memo because runoff from the lakes, after meeting the one inch detention treatment requirement, spills into the wetland preserves within the SWMS for an additional 50 percent of treatment. In terms of operation of the SWMS, this is no different from the 2004 ERP, but the 2006 ERP simply calculates and takes credit for the additional treatment that was also provided by the onsite wetlands in the 2004 ERP. It is uncontested that the wetland preserves within the development are not impaired and are only required to meet Class III water quality standards. When the stormwater spills into the SWMS wetland preserves, it is presumed to meet Class III water quality standards due to the one inch of detention treatment. Accordingly, the SWMS wetland preserves can be used to provide the additional 50 percent of treatment. The Bates Memo also lists seven BMPs as potential options to consider, in addition to the extra 50 percent treatment volume. G.L. Homes is implementing 6 of the 7 items as follows: (1) the CPPP, which is a stormwater pollution prevention plan; (2) an operation plan or long-term plan addressing routine maintenance is included in the USMP; (3) planting littoral zones; (4) some utilization of onsite wetlands for additional treatment downstream of the SWMS by discharging into the Eastern Preserve wetland system through WCS-2 at times; (5) a site-specific water quality evaluation for the Project’s pre- and post-development conditions is addressed by the Harper Report (RJ Ex. 25); and (6) a Water Quality Monitoring Plan, which is required under the USMP. Petitioner erroneously argued that the Bates Memo does not allow the 50 percent treatment to occur in the preserve wetlands within the development. The argument stems from the phrase “in addition to the extra 50% treatment volume” at the bottom of page 3 of the memo, and bullet No. 5 on page 4, which recommends “treatment in wetlands downstream of the SWMS.” Absent any analysis of her own or any experience in the application of the Bates Memo, Ms. Hecker contended that the Bates Memo precludes the use of onsite wetlands. The argument is contradictory and confusing because Hecker admits that the preserve wetlands within the development are not downstream of the SWMS, and acknowledges that the Eastern Preserve is the wetland downstream of the SWMS. Ms. Hecker, along with Mr. Boler, ultimately admitted that criteria exist allowing the use of wetlands as part of the SWMS. Mr. Waterhouse, who has vastly more experience with the District’s water quality criteria than Ms. Hecker, and participated in the drafting of the Bates Memo, refuted Ms. Hecker’s position about the intent of the Bates Memo, citing to Section 5.3.1 of the BOR as additional support for the use of onsite wetlands for water quality treatment. In addition to these water quality submittals, G.L. Homes also provided a water quality analysis specific to the Project prepared by Dr. Harvey Harper. The analysis, entitled “Evaluation of Water Quality Issues Related to the Saturnia Falls Project” (RJ Ex. 25), referred to as the “Harper Report,” analyzed the Project’s pre- and post-development pollutant loads to help demonstrate that the Project would not contribute to the impairment of the Cocohatchee Canal. The Harper Report estimated the removal efficiency of the SWMS lakes to determine how much pollutant removal would be achieved by the lakes on the Project. Dr. Harper relied solely on the lakes without accounting for any of the additional treatment expected to occur in the wetlands or from the source control BMPs contained in the USMP, which means his report errs on the conservative side in those respects. Although the Canal is impaired for dissolved oxygen (DO), it is uncontested that a nutrient analysis is the appropriate method to assess DO conditions. The Harper Report, as summarized in the table below, concluded that the Project would result in lower post-development loading rates than the pre-development loading rates for nutrients. Nitrogen (N) Pre-Development Total N Load 390.6 kg Post-Development Removal (Dry4) Total N Load 204.99 kg Post-Development Removal (Wet5) Total N Load 194.69 kg Phosphorus (P) Pre-development Total P Load 15.12 kg Post-Development Removal (Dry) Total P Load 5.29 kg Post-Development Removal (Wet) Total P Load 4.49 kg The Harper Report compared the Post-Development Total Basin Loading numbers for P (136.43 kg) and for N (922.57 kg), on an average annual basis, coming from the residential areas (roads and lots) to the Post-Development Removal Loads for P [5.29 kg (dry) and 4.49 kg (wet)] and for N [204.99 kg (dry) and 194.69 kg (wet)] discharging from the lakes after treatment. The calculations demonstrated that approximately 77 percent of N would be removed by the lakes in the dry season conditions and approximately 78 percent would be removed in the wet season conditions. Approximately 95 percent of P would be removed by the lakes in both the dry and wet season conditions. Additional removal and treatment above these percentages is expected due to a number of other source control measures not accounted for in the Harper Report. The Harper Report also concluded that iron discharges from the SWMS would be extremely low and substantially less than the Class III standard of 1 mg/l. Petitioner presented no evidence to counter this conclusion. Petitioner questioned the validity of Harper Report’s use of wetlands as part of the loading calculations, and attacked his underlying methodology. Petitioner's witnesses called it "bad science" to attribute pollutant loading to wetlands because wetlands remove nutrients from the water column and because attributing nutrient loading to wetlands would make it easier to obtain a permit to destroy wetlands. However, none of Petitioner's witnesses were able to credibly defend the position that wetlands cannot contribute to the loading calculations and at times conceded to this fact. Generally, wetlands can in fact contribute some nutrients that pass through without being taken up by wetland vegetation, either because the water is moving through the wetlands too fast or because the nutrient load in the wetland overtaxes the wetland's ability to take up nutrients. That does not necessarily mean that the nutrient load attributable to a wetland will be greater than the load attributable to other post-development land uses. Indeed, the only post-development land use characterized by Dr. Harper as having a lower pollutant load than a wetland was low- intensity commercial, and that was only for total nitrogen. (Dr. Harper's use of data from some distance away in Corkscrew Swamp as the basis for characterizing the pollutant loadings for the onsite wetlands, instead of data from a closer monitoring station in the Cocohatchee Canal weir, was justified; his use of that data instead of collecting data onsite was a valid criticism, but there was not enough evidence in support of that criticism to undermine the additional assurance derived from Dr. Harper's work.) As for the argument that the "Harper method" makes it easier to obtain a permit to destroy wetlands, there are many regulatory criteria other than just water quality that are supposed to be considered before a permit is issued to impact wetlands. Another component of Petitioner’s attack on the Project’s water quality compliance included vague references to an 80 percent removal efficiency. In actuality, the 80 percent removal efficiency is not adopted or incorporated into any District rule criteria. In any event, the Harper Report and other evidence give reasonable assurance that, along with other source controls, the proposed SWMS probably will remove 80 percent of pollutants on an average annual basis. Lastly, the District clarified why Section 4.2.8 of the BOR, regarding cumulative impacts for water quality, was not applicable in this case. Since no contribution or impacts to water quality are expected, a cumulative impacts analysis is not necessary to assess the extent of the impacts. The combination of all these water quality measures, when taken together, give reasonable assurance that the 2006 ERP will not adversely affect the quality of receiving waters such that State water quality standards will be violated, and that Rule 40E-4.301(1)(e) will be satisfied. Engineering Principles (Rule 40E-4.301(1)(i)) Rule 40E-4.301(1)(i) requires an applicant to provide reasonable assurances that the SWMS will be capable, based on generally-accepted engineering and scientific principles, of being performed and of functioning as proposed. Section 7.0 of the BOR specifies implementation of the Rule. Since WCS-1 and WCS-2 are proposed as operable structures, the District is requiring that G.L. Homes enter into an operable Control Structure Agreement with the Big Cypress Basin Board. The agreement provides for the Big Cypress Basin Board to operate and maintain the two operable structures, instead of the Saturnia Falls Homeowners Association. As Mr. Waterhouse explained, this is a reasonable and logical requirement. WETLAND ERP CRITERIA As with the SWMS criteria, the wetland criteria review of this modification compares the Project to 2004 ERP. Functions To Fish & Wildlife And Listed Species (Subsection 40E- 4.301(1)(d)) Rule 40E-4.301(1)(d) requires an applicant to provide reasonable assurances to demonstrate that the construction, alteration, operation, maintenance, removal, or abandonment of a SWMS will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Section 4.2.2 of the BOR provides further specificity to ensure that a project will not impact the abundance and diversity of fish, wildlife and listed species. The 2006 ERP makes no changes or modification to the 280 acres of wetland impacts allowed in the 2004 ERP. Since the impacts remain the same, the 2006 ERP does not modify or affect the values the wetlands provide to either the abundance or diversity of fish and wildlife, compared to the 2004 ERP. Review of this criterion was determined in the 2004 ERP and should not be re- opened. Section 4.2.2.3 of the BOR addresses the functional assessment of the values provided by the Project’s wetlands. The wetland values were not reassessed in the 2006 ERP because the wetland impacts remain the same as in the 2004 ERP. The evidence was that the current value of the wetlands remains low due to heavy melaleuca infestation, with 75 percent coverage in most locations. While Petitioner may disagree with how the current wetlands were evaluated, nothing in this modification request requires a reassessment of their value. Accordingly, the value of the wetlands currently onsite has not changed, and this criteria should not be re-opened. Section 4.2.2.4 of the BOR requires that a regulated activity not adversely impact the hydroperiod of wetlands or other surface waters. Specifically, the criterion states as follows: [An] applicant must provide reasonable assurances that the regulated activity will not change the hydroperiod of a wetland or other surface water, so as to adversely affect wetland functions or other surface water functions as follows: Whenever portions of a system, such as constructed basins, structures, stormwater ponds, canals, and ditches, are reasonably expected to have the effect of reducing the depth, duration or frequency of inundation or saturation in a wetland or other surface water, the applicant must perform an analysis of the drawdown in water levels or diversion of water flows resulting from such activities and provide reasonable assurance that these drawdowns or diversions will not adversely impact the functions that wetlands and other surface waters provide to fish and wildlife and listed species. Increasing the depth, duration, or frequency of inundation through changing the rate or method of discharge of water to wetlands or other surface waters or by impounding water in wetlands or other surface waters must also be addressed to prevent adverse effects to functions that wetlands and other surface waters provide to fish and wildlife and listed species. Different types of wetlands respond differently to increased depth, duration, or frequency of inundation. Therefore, the applicant must provide reasonable assurance that activities that have the potential to increase discharge or water levels will not adversely affect the functioning of the specific wetland or other surface water subject to the increased discharge or water level. Whenever portions of a system could have the effect of altering water levels in wetlands or other surface waters, applicants shall be required to: monitor the wetland or other surface waters to demonstrate that such alteration has not resulted in adverse impacts; or calibrate the system to prevent adverse impacts. Monitoring parameters, methods, schedules, and reporting requirements shall be specified in permit conditions. Subsection (a) applies if the Project was expected to reduce the depth, duration, or frequency of inundation or saturation in any of the Project’s wetlands. Subsection (b) applies if the Project is expected to increase the depth, duration, or frequency of inundation through changing the rate or method of discharge of water to wetlands or other surface waters. Subsection (c) requires monitoring of the wetlands to determine the effects of the hydrological changes. Persuasive engineering and biological testimony demonstrated that no change (neither a reduction nor an increase) in the hydrology on the preserved wetlands or the Eastern Preserve will occur from what was permitted in the 2004 ERP. By analyzing the various biological indicators onsite, control elevations within the SWMS and the wetlands (both the Eastern Preserve and onsite preserve wetlands) were set at 13.4 feet NGVD, which is the WSWT. This matched the control elevation under the 2004 ERP. Ms. Bain and Mr. Passarella both testified that the hydroperiods in the wetlands would remain the same as in the 2004 ERP during normal conditions, the most important indicator of wetland success, and that the wetlands would be unaffected by the modifications. The WSWT is a common indicator of average wet season water levels in a wetland, which generally is the best indicator of maintaining appropriate hydrology and thereby maintaining the expected level of wetland function. However, as indicated, the deep lakes next to preserved wetlands within the SWMS could draw down those wetlands during dry conditions; but the potential lake effect was present in the 2004 ERP. Both Dr. Van Lent and Jason Lauritsen conceded that, with the elimination of the Flow-way, the hydrology in the Eastern Preserve would be better in the 2006 ERP than in the 2004 ERP. But, as indicated, there was no detailed analysis of wetland impacts from the 2006 modifications because G.L. Homes and the District took the position that no detailed analysis was necessary since the control elevation remained unchanged. Petitioner attempts to cast doubt as to the level of data reviewed by the District to conclude that no changes will occur in the hydrology of the wetlands. But the additional modeling recommended by Petitioner is unnecessary and unwarranted in the face of the biological indicators collected from the Project site over several years. These biological indicators are reliable and customary information to use when ensuring compliance with Section 4.2.2.4. They also resulted in the same control elevation that was set in the 2004 ERP. Petitioner never disputed the credibility of the biological indicators, nor did they present any contrary evidence (either a model or otherwise) that purported to show the wetlands would not function as permitted in the 2004 ERP based on these indicators. Instead, they simply asserted that additional analysis should be done. Although not precipitated by this criterion, G.L. Homes will conduct monitoring of the wetlands by implementing the Monitoring Plan as additional reasonable assurances that the wetlands will not be affected. Secondary Impacts To Water Resources (Subsection 40E- 4.301(1)(f)) Rule 40E-4.301(1)(f) and Section 4.2.7 of the BOR require a demonstration that the proposed activities will not cause adverse secondary impacts to the water resources. No secondary impact analysis was done because the site plan and wetland impacts remained unchanged from the 2004 ERP. Additional Wetland Provisions (Subsection 40E-4.301(3) and 40E- 4.302 Subsection 40E-4.301(3) addresses the remaining wetland criteria in the BOR, including mitigation and elimination or reduction of impacts. Rule 40E-4.302(1)(b) addresses the cumulative impacts analysis contained in Section 4.2.8 of the BOR. No assessment of elimination and reduction of wetland impacts was done because the wetland impacts remain unchanged from the 2004 ERP. The 2006 modifications do not warrant another elimination and reduction analysis. No cumulative impacts analysis is necessary because, as in the 2004 ERP, all proposed mitigation for wetland impacts are within the same drainage basin (West Collier) as the impacts. Logically, if the mitigation proposed for the 2006 modifications fully offsets the wetland impacts, there will be no impacts to cumulate with others impacts of other development activities. On the other hand, if the mitigation does not fully offset the impacts, the application will be denied for that reason, without the need for a cumulative impacts analysis. Section 4.3 of the BOR specifies criteria for mitigation proposed as part of an ERP application. Both G.L. Homes and the District took the position that, similar to the wetland impacts, the proposal for both onsite and offsite mitigation did not change from the 2004 ERP, and that no detailed analysis of the mitigation proposal, or comparison to wetland impacts, was required. Indeed, the onsite mitigation proposal--which includes preservation, restoration of wetlands by removing melaleuca, and the creation of four shallow depressional areas for wood stork habitat--remains unchanged from the 2004 ERP, including the Grading and Planting Plan, the Monitoring Plan, and Mitigation, Monitoring and Maintenance Plan. It was proven that the Flow- way footprint never was considered to be either a wetland impact or a part of the mitigation proposal, and that its removal from the Eastern Preserve does not decrease the amount or the value of the mitigation. (Actually, its removal probably increases the value of the mitigation, but the amount of any such increase was not analyzed or quantified.) It also was proven that the onsite wetlands will not be adversely affected as a result of the 2006 modifications so as to decrease their mitigation value, as Petitioner contended. Petitioner also raised the concern that the wetland mitigation within the SWMS would not function as permitted in the 2004 ERP due to the storage of the additional 50 percent within those wetlands, thereby affecting the mitigation assessment. However, as already indicated, when the water reaches those internal wetland preserves, it will have been treated to Class III water quality standards. In addition, operationally, the water also would have been stored in those wetlands under the 2004 ERP; the only difference is that the 2006 modifications calculate and claim credit for the storage, which was not necessary or done for the 2004 ERP. In addition to the onsite mitigation, G.L. Homes previously had been permitted to provide offsite mitigation in the form of a $1.26 million cash payment to the District. The payment was for the purchase, restoration, and enhancement of 154 acres of lands within the boundaries of the District’s environmental restoration project called CREW. Payment of cash for use by the District is addressed in Section 4.3.1.8 of the BOR. These types of offsite mitigation opportunities are referred to as a regional offsite mitigation areas or “ROMAs.” Unlike most mitigation banks, ROMAs, such as CREW, involve a land acquisition component and are owned and operated by the District. G.L. Homes and the District take the position that, under Section 4.3.1.8 of the BOR, and the previous 2004 ERP, G.L. Homes’ responsibilities ended when it paid the cash donation to the District. They take the position that the mitigation is unaffected by the modification, and that re- opening of the offsite mitigation requirement is unwarranted. However, while the Staff Report characterizes the $1.26 million payment as "a substantial amount of up-front mitigation for the proposed wetland impacts," no land in CREW has been purchased as of yet. In addition, the evidence was that, as a result of the passage of time and market forces, it unlikely that 154 acres of land within CREW can be purchased, enhanced, and maintained with the funds paid to the District under the 2004 ERP. Indeed, for a number of reasons, including the lack of willing sellers to participate in the CREW ROMA, in 2004 the District stopped accepting payment of funds to purchase land in CREW as an acceptable form of mitigation for wetland impacts. As a result, it no longer can be said that the proposed mitigation package, which includes and relies on the use of the funds to purchase, enhance, and maintain 154 acres in CREW, fully offsets the proposed wetland impacts. (In addition, under Rule 40E- 4.331(2)(a), any new mitigation proposal would have to analyzed using the Uniform Mitigation Assessment Methodology, Rule 62- 345.100.) Finally, if the offsite mitigation outside the drainage basin is used, a cumulative impact analysis will be necessary. Public Interest Test (Rule 40E-4.302(1) In addition to complying with Rule 40E-4.301, since the Project is located in, on, or over wetlands, G.L. Homes must also address the criteria contained in the Public Interest Test, Rule 40E-4.302 and Section 4.2.3 of the BOR, by demonstrating that the Project is not contrary to the public interest. (Since the Project is not within an OFW or does not significantly degrade an OFW, the higher standard of “clearly in the public interest” does not apply.) The District considers and balances the following seven factors in determining compliance with the test: Whether the regulated activity will adversely affect the public health, safety, or welfare or the property of others (40E-4.302(1)(a)1.); 93. G.L. Homes provided reasonable assurances that the Project will not cause any onsite or offsite flooding, nor will the Project cause any adverse impacts to adjacent lands because the SWMS is designed in accordance with District criteria and the post-development peak rate of discharge does not exceed the allowable discharge rate. The Project is considered neutral as to this factor. However, it appears from the evidence that the 2002 ERP and the 2004 ERP viewed those proposals as positive as to this factor due to the inclusion of the Flow-way in an effort to alleviate regional flooding. Whether the regulated activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats (40E-4.302(1)(a)2.); 94. As indicated, the Project proposes onsite mitigation which has not changed from the 2004 ERP, but passage of time and market conditions have changed the offsite mitigation proposal. As a result, it no longer can be said based on the evidence in this case that the overall mitigation proposal offsets potential impacts to fish and wildlife, including wood stork habitat, even though the mitigation plan for the Eastern Preserve would improve wood stork habitat from its current melaleuca-infested condition. For these reasons, the Project cannot be considered positive as to this factor. Whether the regulated activity will adversely affect navigation or the flow of water or cause harmful erosion or shoaling (40E-4.302(1)(a)3.); 95. The Project will not adversely affect navigation. In addition, no evidence was introduced to suggest that the Project’s construction would result in harmful erosion or shoaling. The balance of the testimony pertaining to the flow of water in the Project indicated that it will not be adversely affected. Although there will be reduced discharge to the Eastern Preserve as a result of the 2006 modifications, the Project is considered neutral as to this factor. In contrast, it appears from the evidence that the 2002 ERP and the 2004 ERP would have viewed those proposals as positive as to this factor due to the inclusion of the Flow-way in an effort to alleviate regional flooding. Whether the regulated activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity (40E-4.302(1)(a)4.); 96. The Project does not provide any fishing, recreational values, or marine productivity. Therefore, the Project is neutral as to this factor. Whether the regulated activity will be of a temporary or permanent nature (40E-4.302(1)(a)5.); 97. The Project is permanent in nature and is considered neutral as to this factor because reasonable assurances have not been given that mitigation will fully offset the permanent wetland impacts. Whether the regulated activity will adversely affect or will enhance significant historical and archaeological resources under the provisions of Section 267.061, F.S. (40E- 4.302(1)(a)6.); 98. There are no significant archeological or historical resources that will be adversely affected by the Project. In addition, no new information was received by the District indicating that historical resources would be impacted. Therefore, the Project is considered neutral as to this factor. The current condition and relative value of functions being performed by areas affected by the proposed regulated activity (40E-4.302(1)(a)7.); As found, reasonable assurance has not been given that the current condition and relative value of functions being performed by the areas affected by the Project will be fully offset by mitigation. Therefore, the Project should be considered negative as to this factor. On balance, the Project, overall, is negative when measured against these criteria. Accordingly, it must be determined that reasonable assurance has not been given that the Project, as a whole, is not contrary to the public interest.

Conclusions DOAH has jurisdiction over the parties and the subject matter of this proceeding pursuant to Sections 120.569 and 120.57, Florida Statutes. Under Section 403.412(6), Florida Statutes: Any Florida corporation not for profit which has at least 25 current members residing within the county where the activity is proposed, and which was formed for the purpose of the protection of the environment, fish and wildlife resources, and protection of air and water quality, may initiate a hearing pursuant to s. 120.569 or s. 120.57, provided that the Florida corporation not for profit was formed at least 1 year prior to the date of the filing of the application for a permit, license, or authorization that is the subject of the notice of proposed agency action. It is concluded that use of virtually the identical statutory language is not mandatory for standing under this statute and that the Conservancy meets the requirements for standing under this statute. Party status under Sections 120.569 and 120.57, Florida Statutes, also can be based on proof that "substantial interests will be affected by proposed agency action." § 120.52(12)(b), Fla. Stat. This requires proof of "an injury in fact which is of sufficient immediacy and is of the type and nature intended to be protected" by the substantive law. § 403.412(5), Fla. Stat. See also Agrico Chemical Co. v. Dept. of Environmental Reg., 406 So. 2d 478 (Fla. 2d DCA 1981). An organization like the Conservancy may allege and prove either that its own substantial interests or those of a substantial number of its members will be affected. See Florida Home Builders Ass'n v. Dept. of Labor and Employment Security, 412 So. 2d 351 (Fla. 1982); Farmworker Rights Organization, Inc. v. Dept. of Health, etc., 417 So. 2d 753 (Fla. 1st DCA 1982). In addition, Section 403.412(5), Florida Statutes, provides: No demonstration of special injury different in kind from the general public at large is required. A sufficient demonstration of a substantial interest may be made by a petitioner who establishes that the proposed activity, conduct, or product to be licensed or permitted affects the petitioner's use or enjoyment of air, water, or natural resources protected by this chapter. The Conservancy made a sufficient demonstration under this statute that the proposed 2006 ERP will affect its use or enjoyment of water and natural resources protected by Chapter 403. As a result, the Conservancy also proved standing under Sections 120.569 and 120.57, Florida Statutes. Because the Conservancy has "citizen standing" under Section 403.412(6), Florida Statutes, as well as standing under Sections 120.569 and 120.57, Florida Statutes, it is not necessary to decide G.L. Homes' challenge to the Conservancy's "associational standing." It also is unnecessary and premature to determine whether any party would be entitled under Section 120.68(1), Florida Statutes, to judicial review of the final order entered in this case as "a party who is adversely affected." It is believed that such a determination, if it becomes necessary, can be made upon the evidence in the record. BURDENS OF PROOF AND PERSUASION This is a de novo proceeding designed to formulate final agency action. See Florida Department of Transportation v. J.W.C. Company, Inc., 396 So. 2d 778, 786-787 (Fla. 1st DCA 1981); and § 120.57(1)(k), Fla. Stat. As an ERP applicant, G.L. Homes has the ultimate burden of proof and burden of persuasion. See J.W.C. Company, Inc., 396 So. 2d at 786-789. In light of the evidence presented in this case, the option suggested in the J.W.C. case to shift the burden of presenting evidence was not useful. ERP CRITERIA The permitting criteria for G.L. Homes' proposed Project are found in Parts I and IV of Chapter 373, Florida Statutes, Florida Administrative Code Chapter 62-345, Florida Administrative Code Rules 40E-4.301 and 40E-4.302, and the BOR, which is adopted by reference in Rule 40E-4.091(1)(a). For its proposed Project to be permitted, G.L. Homes must give reasonable assurance of compliance with those criteria. Issuance of an ERP must be based solely on compliance with applicable permit criteria. See Council of the Lower Keys v. Charley Toppino & Sons, Inc., 429 So. 2d 67 (Fla. 3d DCA 1983). Reasonable assurance contemplates a substantial likelihood that the project will be successfully implemented. See Metropolitan Dade County v. Coscan Florida Inc., 609 So. 2d 644 (Fla. 3d DCA 1992). Absolute guarantees are not necessary, and a permit applicant is not required to eliminate all contrary possibilities or address impacts that are only theoretical and cannot be measured in real life. See City of Sunrise v. Indian Trace Community Development District, et al., DOAH Case No. 91- 6036, 1991 Fla. ENV LEXIS 6997, 92 ER FALR 21 (DOAH 1991, SFWMD 1992); Manasota-88, Inc. v. Agrico Chemical Co. and Department of Environmental Regulation, DOAH Case No. 87-2433, 1990 Fla. ENV LEXIS 38 (DOAH Jan. 5, 1990; DER Feb. 19, 1990). The test in this case is not whether the District properly evaluated the 2004 ERP, but whether the areas proposed to be modified or affected by the modification met the applicable conditions for issuance. When a permittee seeks to modify an existing permit, the District’s review includes only that portion of the existing permit that is proposed to be modified or is affected by the modification. Fla. Admin. Code R. 40E-4.331(2). See also Friends of the Everglades, Inc., v. Dep't. of Envt'l. Reg., 496 So. 2d 181, 183 (Fla. 1st DCA 1986); Behrens v. Boran, ORDER NO. SWF 02-052, ER FALR 257 (SWFWMD Aug. 27, 2002), DOAH Case No. 02-0282, 2002 Fla. ENV LEXIS 192 (DOAH July 29, 2002); Kunnen v. Southwest Fla. Water Mgmt. Dist., ORDER NO.: SWF 02-003, DOAH Case No. 01-2571, 2002 Fla. ENV LEXIS 4 (DOAH Dec. 17, 2001; SWFWMD Jan. 29, 2002). The "reasonable assurance" requirement applies to the activities for which permitting is presently sought and, except to the extent affected by the proposed modification, does not burden the applicant with "providing 'reasonable assurances' anew with respect to the original permit." Friends of the Everglades, supra at 183. Accordingly, Petitioner’s arguments that certain criteria must be revisited because they were not properly addressed in previous permits is irrelevant to this proceeding; but previously-decided criteria must be reviewed again to the extent that proposed modifications affect those criteria. CONSIDERATION OF THE ERP CRITERIA In order to provide reasonable assurances that a Project will not be harmful to the water resources of the District, the applicant must satisfy the conditions for issuance set forth in Rules 40E-4.301 and 40E-4.302. In this case, the evidence must be viewed under the rule pertaining to modification of permits. Rule 40E-4.331(2)(a) requires the District to review permit modification applications “using the same criteria as new applications for those portions of the project proposed for, or affected by, the modification.” Surface Water Management Criteria Water Quantity and Flooding Rule 40E-4.301(1)(a) and (b) address adverse water quantity to receiving water bodies and flooding either onsite and offsite. As found, G.L. Homes complied with the applicable criteria to satisfy both of these rules. Storage and Conveyance Rule 40E-4.301(1)(c) requires G.L. Homes to provide reasonable assurances that the Project will not adversely impact storage and conveyance capabilities. As found, the submittal of the Taylor Report provides reasonable assurances that the Project will not adversely affect the conveyance of water. Moreover, although some criticism was aimed at the choice of the friction coefficients used in the Taylor Report, the evidence as a whole proves that the coefficients in the Taylor Report are reasonable and scientifically defensible. Water Quality Rule 40E-4.301(1)(e) requires G.L. Homes to provide reasonable assurances that the Project will not result in adverse water quality impacts. As found, coupled with the clarifications/additions to the USMP suggested by Dr. Harper and accepted by G.L. Homes, the numerous water quality submittals demonstrated compliance with this Rule, including assurances regarding the impairment status of the Cocohatchee Canal. While Petitioner leveled numerous criticisms against the Project’s ability to comply with water quality, none of the criticisms rose to the level of “contrary evidence of equivalent quality.” Taken as whole, and balanced against Petitioner’s lack of equivalent evidence and credible witnesses, the preponderance of the evidence demonstrates that, with the Monitoring Plan additions/clarifications, G.L. Homes meets the District’s water quality criteria. Engineering Principles As required by Rule 40E-4.301(1)(i), G.L. Homes has provided reasonable assurances to demonstrate that the SWMS will be capable, based on generally accepted engineering and scientific principles, of being performed and functioning as proposed. Wetlands Criteria Elimination and Reduction, Secondary and Cumulative Impacts 115. Rules 40E-4.301(1)(f) and (2) and 40E-4.302(1)(b) require G.L. Homes to demonstrate compliance with the following District criteria pertaining to wetland impacts: (1) elimination and reduction; (2) secondary impacts; and (3) cumulative impacts. As found, the 2006 ERP proposes no changes or modifications to the wetlands impacts approved in the 2004 ERP. Therefore, Petitioner’s arguments that these assessments were either not done or done improperly in the previous permit are not valid bases to relitigate those issues. Accordingly, elimination and reduction, secondary impacts, and cumulative impacts addressed in the 2004 ERP are not properly litigated in this modification proceeding, except to the extent that they are affected by the proposed modifications. While the proposed modifications do not affect either elimination and reduction or secondary impacts, they could affect cumulative impacts, depending on whether offset mitigation needed to fully offset wetland impacts is accomplished in the West Collier drainage basin. Wetland Values and Functions to Fish and Wildlife Rule 40E-4.301(1)(d) requires G.L. Homes to provide reasonable assurances that the Project will not adversely impact the value and functions provided to fish and wildlife and listed species by wetlands. Rule 40E-4.301(3) requires an applicant to comply with the District’s mitigation provisions in the BOR. As found, Petitioner’s contention that the revised SWMS affected the values and functions provided to fish and wildlife, particularly the wood stork, was not supported by the weight of the evidence as to onsite mitigation. However, the passage of time and market conditions affected the offsite mitigation proposed and presumably evaluated for the 2004 ERP, and the impacts and mitigation were not re-evaluated for the 2006 ERP. Under Rule 40E-4.331(2), they must be re-evaluated using UMAM, as required by Rule 62-345.100. Public Interest Test The public interest test is limited in scope to only the seven factors set forth in Rule 40E-4.302(2). As found above, after a balancing of the factors, reasonable assurance was not provided that the Project is not contrary to the Public Interest.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the proposed 2006 ERP be denied. If it is granted, it should include the additions/clarifications to the USMP suggested by Dr. Harper and accepted by G.L. Homes. DONE AND ENTERED this 15th day of May, 2007, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 15th day of May, 2007.

Florida Laws (12) 120.52120.569120.57120.573120.68253.04267.061373.042373.086373.416403.4126.10
# 9
BRENDA B. SHERIDAN vs DEEP LAGOON BOAT CLUB, LTD., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 98-003901 (1998)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Sep. 04, 1998 Number: 98-003901 Latest Update: Feb. 02, 2000

The Issue The issue in DOAH Case No. 98-3901 is whether Respondent Deep Lagoon Boat Club, Ltd., is entitled to a maintenance dredging exemption from environmental resource permitting. The issue in DOAH Case No. 98-5409 is whether Respondent Deep Lagoon Boat Club, Ltd., is entitled to an environmental resource permit for the construction of a surface water management system.

Findings Of Fact The Parties Respondent Deep Lagoon Boat Club, Ltd. (Applicant), owns and operates Deep Lagoon Marina. In DOAH Case No. 98-3901, Petitioner and Intervenor challenge Applicant's claim of an exemption to maintenance dredge three canals serving the marina. In DOAH Case No. 98-5409, Petitioner challenges Applicant's request for an environmental resource permit to construct and operate a surface water management system on the uplands on which the marina is located. By stipulation, Petitioner has standing. Intervenor is a nonprofit organization of natural persons, hundreds of whom reside in Lee County. The primary purpose of Intervenor is to protect manatees and their habitat. Many of the members of Intervenor use and enjoy the waters of the State of Florida, in and about Deep Lagoon Marina, and would be substantially affected by an adverse impact to these waters or associated natural resources, including manatees and their habitat. Deep Lagoon Marina is within the jurisdiction of the South Florida Water Management District (SFWMD). By agreement with SFWMD, Respondent Department of Environmental Protection (collectively, with the predecessor agency, DEP) is the agency with permitting jurisdiction in DOAH Case No. 98-5409. The Marina Deep Lagoon is a short, largely mangrove-lined waterway that runs north into the Caloosahatchee River. The Caloosahatchee River runs west from Lake Okeechobee past Fort Myers to the Gulf of Mexico. Deep Lagoon Marina is on Deep Lagoon, less than one-half mile from the Caloosahatchee River. Deep Lagoon Marina comprises uplands and three canals adjoining MacGregor Boulevard south of downtown Fort Myers. Deep Lagoon Marina presently consists of 61 wet slips, 200 dry slips, and other marina-related buildings. One of Applicant's predecessors in interest dredged the three canals in the 1950s or 1960s, and a marina has existed at this location since that time. As a result of a purchase in 1997, Applicant owns the uplands and either owns the submerged bottoms of the canals or has a legitimate claim to such ownership. The attorney who examined the title at the time of the 1997 conveyance testified that the canals are entirely landward of the original mean high water line, so that the then-owner excavated the canals out of privately owned upland. Thus, the attorney opined that the canal bottom is privately owned. Some question may exist as to the delineation of the historic mean high water line, especially regarding its location relative to the waterward edge of the red mangrove fringe, which DEP would consider part of the historic natural waterbody. There may be some question specifically concerning title to the bottom of the northernmost canal where it joins Deep Lagoon. However, the proof required of Applicant for present purposes is considerably short of the proof required to prove title, and the attorney's testimony, absent proof to the contrary, is sufficient to demonstrate the requisite ownership interest to seek the exemption and permit that are the subject of these cases. From north to south, Deep Lagoon Marina comprises the north canal, which is about 1200 feet long and bounded on the north by a red mangrove fringe 10-20 feet wide; a peninsula; the central canal, which is also known as the central or main basin and is roughly the same length as the north canal; a shorter peninsula; and the south canal, which is about half the length of the central canal and turns to the southeast at a 45-degree angle from the midway point of the central canal. The three canals are dead-end canals, terminating at their eastern ends a short distance from MacGregor Boulevard. Manatees and Boating The Caloosahatchee River is critical habitat for the endangered West Indian manatee. Up to 500 manatees use the river during the winter. When, during the winter, the water cools, the animals congregate in waters warmed by the thermal discharge from a power plant about 13 miles upstream of Deep Lagoon. When, during the winter, the water warms, the manatees swim downstream, past and into Deep Lagoon searching for food. Manatees frequently visit Deep Lagoon. It is one of the few places between the power plant and the Gulf where manatees can find a quiet place, relatively free of human disturbance, to rest and feed. Within Deep Lagoon, the Iona Drainage District ditch runs parallel to the north canal, separated from the canal by the previously described mangrove fringe. The Iona Drainage District ditch empties into Deep Lagoon just north of the mouth of the north canal. Manatees frequently visit the ditch because it is a seasonal source of freshwater, which the manatees drink. Manatees visit the north canal due to its moderate depths and proximity to the freshwater outfalls of the Iona Drainage District ditch. Manatee mortality from watercraft is extremely high in the immediate vicinity of Deep Lagoon, and the mortality rate has increased in recent years. The rate of manatee deaths from collisions with watercraft has increased with the popularity of motorboating. Boat registrations in Lee County rose from 13,000 in 1974 to 36,000 in 1997. The potential for mitigation offered by the enactment of speed zones has been undermined by the fact that nearly half of the boaters fail to comply with the speed limits. Water Quality The Caloosahatchee River is laden with sediments, partly due to intermittent discharges from Lake Okeechobee. Seagrass in the riverbottom cannot grow in water much deeper than four feet. Some seagrass grows at the mouth of Deep Lagoon, but little seagrass extends into the lagoon itself. The water quality in the canals is very poor for dissolved oxygen and copper. Applicant stipulated that the water quality in Deep Lagoon violates state standards for dissolved oxygen, copper, and coliform bacteria. In 1997, the canals violated water quality standards for dissolved oxygen nearly each time sampled during the wet season and one-third of the times sampled during the dry season. The dissolved oxygen levels violated even the lower standards for Class IV agricultural waters two-thirds of the times sampled during the wet season. In 1997, the canals violated water quality standards for copper in the water column each time sampled during the wet season and two-thirds of the times sampled during the dry season. During three of the dry season samplings, copper levels were 20 to 30 times lawful limits. The three lowest wet season copper levels were double lawful limits. Copper is a heavy metal that is toxic to a wide range of marine organisms. Copper is applied to boat hulls to prevent marine life from attaching to the hulls. In 1997, the canals violated water quality standards for total coliform bacteria (for any single reading) three of the 60 times sampled during the dry season and one of the 56 times sampled during the wet season. The canals violated the more relaxed, 20-percent standard (which is violated only if 20 percent of the readings exceed it) during the wet season, but not during the dry season. In 1997, the canals violated water quality standards for lead in the water column in one sample (by 25 percent) out of 36, but did not violate water quality standards for oil and grease or fecal coliform bacteria. Results of testing for mercury in the water column (as opposed to sediments) are not contained in the record. As compared to 1987, the water quality in the canals has improved in all but one important respect. In 1987, the water column readings for copper were five to six times higher than the highest 1997 reading. In 1987, the total coliform bacteria were too numerous to count because the colonies had grown together in the sample. However, comparing the April 1987 data with the May 1997 data for the same approximate times of day and the same locations, the dissolved oxygen levels in the three canals have declined dramatically in the last 10 years. Ten years ago, in a one-day sampling period, there were no reported violations; ten years later, in a one-day sampling period, there were four violations. Even worse, the amount of dissolved oxygen in the water during daylight hours has been halved in the last 10 years with a smaller decrease during nighttime hours. Original Permit There are three types of permits relevant to these cases. The first is a dredge and fill permit (sometimes referred to in the record as a wetland resource permit or water resource permit)(DAF permit). The second is a surface water management (sometimes referred to in the record as a management and storage of surface water (MSSW) permit or stormwater management permit)(SWM permit). The third is an environmental resource permit (ERP). Several years ago, responding to a mandate from the Legislature, DEP and the water management districts consolidated DAF permits, which historically were issued by DEP, and SWM permits, which historically were issued by the water management districts, into ERPs. At the time of this change, DEP adopted, within the jurisdictional areas of each water management district, certain of the rules of each district. In 1988, DEP issued a DAF permit to Applicant's predecessor in title for additional wet slips (as modified, the Original Permit). Due partly to the likelihood of the replacement of some older, smaller slips with larger slips, there is some uncertainty as to the precise number of wet slips that Applicant would be able to construct under the Original Permit. However, Applicant would be able to construct approximately 89-113 new wet slips, with an additional 14,440 square feet of overwater decking, so as to raise its marina capacity to 150-174 wet slips. Applicant also plans to construct 227 dry slips, so as to raise its marina capacity to 427 dry slips, and add 115,000 square feet of buildings, including a restaurant. In general, the Original Permit authorizes Applicant to renovate and expand an existing marina from 61 wet slips to 174 wet slips by: excavating 0.358 ac of uplands to create a flushing canal, installing 375 linear feet of seawall along the sides of the flushing canal, excavating 2.43 ac of submerged bottom to remove contaminated sediments, backfilling 2.41 acres of the dredged area (the main basin and south canal to -7 ft. MLW and the north canal to -6 ft. MLW) with clean sand, renovating the existing 61 slips, and constructing an additional 14,440 square feet of overwater decking for 113 new slips, providing after-the-fact authorization for construction of 2 finger piers, creating a 400 sq. ft. mangrove fringe, constructing 180 linear feet of seawall in the vicinity of the mangrove fringe, and relocating and upgrading fueling facilities. The record contains various references to "MLW" or "mean low water," "MHW" or "mean high water," and "NGVD" or "National Geodetic Vertical Datum." The drawings attached to the Original Permit state that MHW equals 0.96 feet NGVD and MLW equals about 0.40 feet NGVD. The Original Permit authorizes activities to proceed in three phases: First, the majority of the water quality improvement measures will be implemented as required in Specific Condition 5. Second, the over water docking structures will be constructed and the fueling facilities will be upgraded and relocated as required in Specific Conditions 6 and 7. Third, the new slips will be occupied in accordance with the phasing plan in Specific Condition 9. Specific Condition 5 imposes several requirements designed "to ensure a net improvement in water quality." Among these requirements is that Applicant must obtain the ERP that is the subject of DOAH Case No. 98-5409 (New Permit). Specific Condition 5 states: In order to ensure a net improvement to water quality within the basin, the construction of any new docking structures or installation of any new pilings shall not occur until the below-listed conditions (A-K) have been met. . . . A baseline water quality study . . .. A stormwater treatment system providing treatment meeting the specifications of Florida Administrative Code 40E-4 for all discharges into the basins from the project site shall be constructed. . . . The boat wash area shall be re-designed and constructed as shown on Sheets 23 and 23A. All water in the washdown area shall drain into the catch basin of the wastewater treatment system shown on Sheet 23. The water passing through the wastewater treatment system shall drain to the stormwater management system which was previously approved by the South Florida Water Management District. The filters of the wastewater treatment system shall be maintained in functional condition. Material cleaned from the filter shall be disposed of in receptacles maintained specifically for that purpose and taken to a sanitary landfill. This system shall be maintained in functional condition for the life of the facility. [As cited, this subparagraph contains modifications stated in a letter dated March 26, 1997, from DEP to Applicant's predecessor in interest.] Contaminated sediments shall be dredged from the areas shown on Sheets 5 and 7 of 23. A closed-bucket clam shell dredge shall be used. The north canal shall be dredged to at least -9.9 feet MLW and backfilled with clean sand to -6 feet MLW. The [main] basin shall be dredged to at least -7.3 feet MLW and backfilled with clean sand to -7 feet MLW. The south canal shall be dredged to at least -10.5 feet MLW and backfilled with clean sand to at least -7.0 feet MLW. Backfilling shall be completed within 120 days of completion of dredging. . . . The sediments shall be placed directly in sealed trucks, and removed to a self-contained upland disposal site which does not have a point of discharge to waters of the state. A channel, 260 ft. long, 60 ft. wide, with a bottom elevation of -4.5 ft. MLW shall be excavated between the north canal and the main basin to improve flushing. * * * K. Upon completion [of] conditions A-J above, renovation of the existing 61 wet slips and construction of the 113 additional wet slips may proceed with the understanding that construction of all 113 additional slips is at the risk of the permittee and that if the success criteria in the monitoring and occupancy program are not met, removal of all or part of the additional slips may be required by the Department. Specific Condition 8 addresses the phasing of occupancy of the wet slips. Specific Condition 8 provides: Occupancy of the additional 113 wet slips shall occur in two phases, described below. Permanent occupancy of the slips shall require [DEP] approval, contingent upon the water quality monitoring program demonstrating a statistically significant (Specific Condition 9) net improvement for those parameters which did not meet State Water Quality Standards in the baseline study. The permittee agrees that if [DEP] determines that net improvement has not occurred, or if violations of other standards occur, and if the corrective measures described in Specific Condition 10 are not successful, all of the additional slips occupied at that time shall be removed. . . . Phase I--Upon completion of the baseline water quality study and the work specified in Specific Condition No. 5, the existing 61 slips and an additional 56 slips, totalling 117 slips, may be occupied. . . . If at the end of one year of monitoring, the data generated from the water quality monitoring program shows a statistically significant improvement over baseline conditions, for those parameters in violation of State Water Quality Standards, and no violations of additional parameters, . . . the new 56 slips which were occupied shall be considered permanent. Phase II--Upon written notification from [DEP] that Phase I was successful, the remaining 57 additional slips may be occupied. Water and sediment quality monitoring shall continue for two years after the occupancy of 140 of the 174 slips. If a statistically significant net improvement to water quality over baseline conditions for those parameters in violation of State Water Quality Standards [sic] and no violation of additional parameters is shown by the monitoring data, and confirmed by [DEP] in writing, the additional slips shall be considered permanent. * * * Specific Condition 11 adds: Implementation of the slip phasing plan described in Specific Condition 8 shall be contingent on compliance of boaters with existing speed zones in the Caloosahatchee River and trends in manatee and [sic] mortality. . . . Approval of additional slips will depend upon manatee mortality trends and boater compliance with speed zones in the Caloosahatchee River and additional slips may not be recommended. . . . Based on the results of the evaluations of Phases I and II, [DEP] may require that slips be removed to adequately protect manatees. Specific Condition 12 requires the construction of a 400 square-foot intertidal area for the planting of mangroves to replace the mangroves lost in the construction of the flushing channel. Specific Condition 14 prohibits liveaboards at the marina. Specific Condition 15 adds various manatee-protection provisions. Plan Views C and D, which are part of the Original Permit, depict submerged bottom elevations for the north and central canals, as well as from the south canal at its intersection with the central canal. Dated August 30, 1995, these "existing" bottom elevations across the mouth of the north canal are about -7, -8, and -4 feet (presumably MLW; see second note to Plan View B). The western two-thirds of the north canal passes over bottoms of about -6 feet MLW. Proceeding east, the bottom deepens to -7 to -9 feet MLW before it tapers up to -7, -6, and finally -3 feet MLW at the head; and the eastern third of the north canal passes over bottoms of about -7 feet MLW that tapers up to -6 feet and -3 feet MLW. The submerged bottom at the mouth of the central canal is about -8 to -9 feet MLW. The bottom drops to -6 to -10 feet MLW at the intersection with the south canal. Proceeding east, the bottom deepens slightly as it reaches the head, where it is -8 feet MLW. The submerged bottom of the south canal runs from -9 feet MLW at the intersection with the central canal and runs about 0.5 feet deeper at the head. Petitioner and others challenged the issuance of the Original Permit in 1988. The permit challengers appealed a final order granting the Original Permit and certifying, under the federal Clean Water Act, that state water quality standards were met. DEP premised its certification on the concept that water quality standards encompassed a net improvement in water quality of the poorly flushed canals. In Sheridan v. Deep Lagoon Marina, 576 So. 2d 771, 772 (Fla. 1st DCA 1991), the court, relying on the above-described 1987 water quality data, noted the "very poor water quality" of Deep Lagoon, as reflected in part by the presence of oil and grease 20 times the Class III standard, copper 13 times the standard, lead 20 times the standard, mercury 1000 times the standard, and coliform bacteria "too numerous to count." However, the court affirmed the issuance of the Original Permit under the statutory authorization of a permit where ambient water quality does not meet applicable standards, but the activity will provide a net improvement to the waters. On the certification issue, though, the court reversed and remanded. The court held that the hearing officer erroneously excluded evidence on DEP's certification of the activity as in compliance the federal Clean Water Act. Following remand, DEP issued a final order issuing the Original Permit. On the certification issue, the final order revoked the earlier certification of compliance and, citing 33 United States Code Section 1341 as authority, waived certification as a precondition to federal permitting. Maintenance Dredging: DOAH Case No. 98-3901 Background The contentions of Petitioner and Intervenor as to maintenance dredging are: the proposed dredging exceeded what was necessary to restore the canals to original design specifications or original configurations; the proposed dredging exceeded the maximum depth allowable for maintenance dredging of canals; the work was not conducted in compliance with Section 370.12(2)(d), Florida Statutes; the spoil was not deposited on a self-contained upland site to prevent the escape of the spoil into waters of the state; and the dredge contractor did not use control devices and best management practices for erosion and sediment control to prevent turbidity, dredged material, and toxic or deleterious substances from discharging into adjacent waters during maintenance dredging. On March 3, 1998, Applicant's engineering consultant submitted drawings to DEP with notification that Applicant intended to "maintenance dredge the internal canals of Deep Lagoon Marina," in conformity with Rule 62-312.050(e), Florida Administrative Code. The letter describes the proposed dredging as mechanical "with no discharge back into Waters of the State." The letter assures that Applicant's contractor will use turbidity curtains "around the dredging and spoil unloading operation" and advises that the contractor will unload the spoil "to the north peninsula upland area." The letter states that the dredging "will be to the design depth/existing canal center line depth of -7 NGVD," which was established by the Original Permit, and will be "done in conjunction with the required dredging under [Original Permit] Condition 5(D)." The consultant attached to the March 3 letter several drawings showing the dredging of all three canals. For each canal, the drawings divide the dredging into two areas. For 1.82 acres, the contractor would dredge contaminated materials from the dead-ends of the three canals (for the south canal, a portion running from the head along the northeast half of the canal) and then replace these materials with clean backfill material. This information is for background only, as the Original Permit authorized this contaminant dredging. For 4.84 acres, which run through the remainder of the three canals, the contractor would maintenance dredge in accordance with the cross-sections provided with the letter. The cross-sections for the north canal reveal relatively extensive dredging beyond the vegetation lines on both sides of the canal bottom. The dredging would extend up to, but not beyond, the edges of the prop roots of the mangroves on both sides of the canal bottom. The contours reveal variable, proposed slope profiles for the submerged sides of the canals, but the dredging would substantially steepen the submerged slopes of the north canal. It is difficult to estimate from the cross-sections the average depth and width to be dredged from the north canal, but it appears that the cross-sections proposed the removal of substantial spoil (an average of 4-6 feet) from areas from 20-40 feet from each side of the deepest point in the north canal. The dredging would alter the two most affected cross-sections, which are just inside the mouth of the north canal, by widening the deepest part of the canal bottom by 85 feet--from about 15 feet to about 100 feet. The drawings proposed much smaller alterations to the bottoms of the central and south canals: typically, spoil about 2 feet deep and 20 feet wide. All but one of the cross-sections revealed that spoil would be dredged only from one side of the deepest point. Additionally, the dredging in these canals would not involve any submerged vegetation; all but one of the canal sides was lined by existing seawalls. By letter dated March 13, 1998, DEP stated that it had determined that, pursuant to Rule 40E-4.051(2)(a), Florida Administrative Code, the proposed activity was exempt from the requirement that the Applicant obtain an ERP. The letter warns that, pursuant to Chapter 62-302, Florida Administrative Code, the construction and operation of the project must not cause water quality violations. The letter adds that DEP may revoke its determination of exemption if the "basis for the exemption is determined to be materially incorrect, or if the installation results in water quality violations." The letter provides a point of entry for persons whose substantial interests are affected by DEP's determination. Following receipt of DEP's letter acknowledging the exemption, Applicant's contractor proceeded to maintenance dredge the three canals. The dredging of the north canal took eight weeks. Applicant's contractor also performed the contaminant dredging and clean backfilling authorized by the Original Permit. As indicated in the March 3 letter and permitted in the Original Permit, the contaminant dredging took place at the dead-end heads of the north and central canals and along the northeast half of a slightly longer section of the south canal, starting from its dead-end head. In maintenance dredging the canals, Applicant's contractor did not exceed the specifications regarding depth and width stated in its March 3 letter. To the contrary, the contractor sometimes dredged slightly narrower or slightly shallower profiles than stated in the March 3 letter. For example, the contractor dredged the north canal to -6 feet NGVD (or -5.6 feet MLW), rather than -7 feet NGVD, as shown in the March 3 letter. The Depths, Widths, and Lengths of Dredging The March 3 letter asserts that -7 feet NGVD is the permitted elevation of the canal bottoms, pursuant to the Original Permit. This is incorrect in two respects. First, the assertion in the March 3 letter of a -7 foot permitted bottom elevation is incorrect for all but the relatively small part of each canal that DEP has determined is contaminated. The Original Permit specifies design elevations for canal bottoms only in the contaminated area within each canal. Nothing in the Original Permit permits bottom elevations for any portion of the bottoms of the three canals outside of these three contaminated areas. Second, the assertion in the March 3 letter of a -7 foot permitted bottom elevation is incorrect, even for the contaminated areas. The March 3 letter states -7 feet NGVD, but the Original Permit specifies bottom elevations, for contaminated areas only, of -7 feet MLW in the south and central canals and -6 feet MLW in the north canal. Thus, due to the differences between NGVD and MLW, the March 3 letter proposes dredging that would deepen the south and central canals by about five inches deeper than the depth permitted in the Original Permit and the north canal by one foot five inches deeper than the depth permitted in the Original Permit. Moreover, nothing in the record clearly establishes all aspects of the original design specifications of the three canals, whether permitted or not, or even all aspects of their original dredged configurations, if not permitted. There is no dispute concerning one aspect of the dredged configuration of the three canals: their lengths. Although there may be some dispute as to the original mean high water line near the mouths of the north and central canals, the original length of the canals is evident from the uplands that presently define them. As to the depth of the canals, although direct evidence is slight, Applicant has sufficiently proved indirectly the depths of the mouths of the canals pursuant to original design specifications or, if not designed, original configurations. The proved bottom elevations are -7 feet NGVD for each canal. Applicant proved these depths based on the prevailing elevations in Deep Lagoon in the vicinity of the mouths of the north and central canal and bottom elevations in areas of Deep Lagoon that are not prone to sedimentation. Additional proof of the bottom elevation of -7 feet NGVD at the mouths of the canals is present in the slightly higher permitted bottom elevations at the dead- ends of the north and central canals and landward portion of the south canal. There is some problem, though, with the proof of the depth of the canal bottoms between their mouths and heads (or, for the south canal, its landward portion of known contamination). Although the problem of the depth of the canals between their heads and mouths might be resolved by inferring a constant bottom elevation change from the deeper mouth to the shallower head, an unresolveable issue remains: the width of this maximum depth. As already noted, without deepening the deepest part of either cross-section, the contractor widened the deepest points along two cross-sections by 85 feet each. In terms of navigability and environmental impact, the width of the maximum depth of a canal is as important as its maximum depth. As to the width of the lowest bottom elevations of the canals, Applicant has produced no proof of original design specifications or, if not designed, original configurations. Nor has Applicant produced indirect proof of historic widths. Nothing in the record supports an inference that Applicant's predecessor in interest originally dredged the canal bottoms as wide as Applicant "maintenance" dredged them under the claimed exemption. Nothing in the record supports an inference that Applicant's predecessor geometrically dredged the canals so that their sides were perpendicular to their bottoms. Nothing in the record describes a sedimentation problem that might have narrowed the canals by such an extent that the dredging of the present widths, especially in the north canal, would be restorative. Nothing in the record even suggests that the original motive in dredging was navigability, which might have yielded relatively wide canal bottoms, versus upland fill, which would yield canal bottoms as wide as needed, not for navigability, but for uplands- creation. After consideration of all the evidence, no evidence supports a finding that the proposed dredging profiles, in terms of the widening of the areas of lowest elevation in each canal bottom, bear any resemblance whatsoever to the original canal profiles, as originally (or at any later point) designed or, if not designed, as originally (or at any later point) configured. It is at least as likely as not that this is the first time that these canal bottoms, especially the north canal bottom, have ever been so wide at any bottom elevation approaching -7 feet NGVD. There is simply no notion of restoration or maintenance in the dredging that produced these new bottom profiles for these three canals. Transforming MLW to NGVD, -5 feet MLW is -4.6 feet NGVD. All proposed and actual maintenance dredging in the three canals dredged the canal bottoms to elevations lower than -5 feet MLW (or -4.6 feet NGVD), despite the absence of any previous permit for construction or maintenance of the canal from the Trustees of the Internal Improvement Trust Fund or the United States Army Corps of Engineers. Impact of Dredging on Manatees and Spoil Containment Prior to dredging, Applicant deployed turbidity curtains around the mouths of the two canals that discharge directly into Deep Lagoon. In this case, the turbidity curtains performed two functions. They contained turbidity and resuspended bottom contaminants within the mixing zone behind (or landward of) the curtains, and they excluded manatees from the dangerous area behind the curtains where the dredging was taking place. Petitioner and Intervenor object to the use of the turbidity curtains on two general grounds. First, they claim that the curtains failed to contain turbidity and resuspended contaminants from escaping the mixing zone. Second, they claim that the curtains adversely affected manatees. As executed, the maintenance dredging did not result in the release of turbidity or resuspended contaminants outside of the mixing zone due to the use of turbidity curtains. Applicant's contractor ensured that the curtains extended from the water surface to the canal bottom and sufficiently on the sides to prevent the escape of turbidity or resuspended contaminants. Although the March 3 letter did not indicate where the contractor would deploy the turbidity curtains, the important point, in retrospect, is that the contractor properly deployed the curtains. There is some question whether turbidity or resuspended contaminants flowed across the mangrove fringe and into the Iona Drainage District ditch. Applicant's witness testified that water flows across the fringe only during the highest three or four tides per month. Petitioner and Intervenor's witness testified that water flows across the fringe as often as twice per day. The actual frequency is likely somewhere between these two extremes, but, regardless of the frequency, there is insufficient evidence to find that any turbidity or resuspended contaminants flowed from the north canal into the Iona Drainage District ditch. Nor did the deployment of the turbidity curtains injure, harm, possess, annoy, molest, harass, or disturb any manatees. Applicant and its contractor carefully checked each canal for manatees before raising the turbidity curtains at the mouth of each canal, so as not to trap any manatees in the area behind the curtains. By ensuring that the curtains extended to the canal bottom and extended fully from side to side, they ensured that the curtains excluded manatees during the dredging. There is no evidence that a manatee could have entered the north canal from the Iona Drainage District ditch by crossing the red mangrove fringe; any breaks in the fringe were obstructed by prop roots that prevented even a kayaker from crossing the fringe without portaging. Applicant and its contractor checked for manatees during dredging operations. Petitioner and Intervenor contend that the mere presence of the turbidity curtains in an area frequented by manatees adversely affected the animals. However, this argument elevates a speculative concern with a manatee's response to encountering an obstruction in its normal path over the practical purpose of curtains in physically obstructing the animal so as to prevent it from entering the dangerous area in which the dredge is operating, as well as the unhealthy area of turbidity and resuspended contaminants in the mixing zone. Under the circumstances, the use of the turbidity curtains to obstruct the manatees from visiting the dredging site or mixing zone did not adversely affect the manatees. In general, there is no evidence of any actual injury or harm to any manatees in the course of the dredging or the preparation for the dredging, including the deployment of the turbidity curtains. Petitioner and Intervenor offered evidence that maintenance dredging would result in more and larger boats and deterioration of water quality, which would both injure the manatees. However, as noted in the conclusions of law, the Administrative Law Judge excluded from DOAH Case No. 98-3901 such evidence concerning long-term impacts upon the manatees following the dredging. As for spoil containment, Applicant's contractor segregated the contaminated spoil from noncontaminated spoil by placing the contaminated spoil in a lined pit in the uplands. The contractor also brought onto the uplands clean fill mined from a sand quarry for backfilling into the dredged contaminated areas. There is evidence of the clean fill subsiding from its upland storage site and entering the canal waters in the mixing zone. Partly, this occurred during the loading of the barge, which transported the clean fill to the dead-end heads of the canals where the fill was placed over the newly dredged bottoms. The fill escaped into the water at a location about 100 feet long along the north seawall of the central canal, but the evidence does not establish whether this location was within the contaminated area at the head of the canal or whether the maintenance or contaminant dredging had already taken place. If the fill subsided into the water inside of the contaminated head of the south canal and the subsidence occurred prior to the contaminant dredging, the subsidence was harmless because the contractor would remove the fill during the dredging. If the fill subsided into the water inside the contaminated head of the south canal and the subsidence occurred after the contaminant dredging, the subsidence was harmless because the contractor intended to add the fill at this location. If the fill subsided into the water outside of the contaminated head of the south canal and the subsidence occurred prior to maintenance dredging, the subsidence was harmless because the contractor would remove the fill during the dredging. If the fill subsided into the water outside the contaminated head of the south canal and the subsidence occurred after the maintenance dredging, the subsidence was harmless because it restored the canal bottom to a higher elevation following the dredging to an excessively low elevation. The subsidence of the clean fill into the water along the north side of the central canal is the only material that entered the water from the uplands during the dredging. Specifically, there is no evidence of dredged spoil entering the water from the uplands during or after the dredging. There is also no evidence that the maintenance dredging significantly impacted previously undisturbed natural areas. There is no evidence of such areas within the vicinity of Deep Lagoon Marina. New Permit: DOAH Case No. 98-5409 New Permit Seeking to satisfy certain of the requirements of Original Permit Specific Condition 5, Applicant filed with DEP, on December 10, 1997, an application for an ERP and water quality certification to construct a surface water management system to serve 15.4 acres of its 24-acre marina. Prior to its reformulation as an ERP, the New Permit sought by Applicant would have been a SWM permit. The application notes that the general upland elevation is 5 feet NGVD and that stormwater runoff presently sheetflows directly to adjacent waterways without any treatment. During the application process, Applicant's engineer Christopher Wright, submitted a letter dated February 27, 1998, to Jack Myers, who is a Professional Engineer II for DEP. In response to a request from DEP for a "written procedure . . . to assure the proper functioning of the proposed . . . system," the letter states: Since the system is not designed as a retention system and does not rely upon infiltration to operate properly[,] operation and maintenance is minimal. Items that will need regular maintenance are limited to removal of silt and debris from the bottom of the drainage structures and the bleed down orifice of the control structure. A maintenance and inspection schedule has been included in this re-submittal as part of Exhibit 14. In relevant part, Exhibit 14 consists of a document provided Mr. Wright from the manufacturer of the components of the surface water management system. The document states that the manufacturer "recommends that the landowner use this schedule for periodic system maintenance . . .." The document lists 16 sediment-control items, but it is unclear whether all of them are incorporated into the proposed system. Four items, including sediment basins, require inspections quarterly or after "large storm events" and maintenance consisting of the removal of sediment; the "water quality inlet" requires inspections quarterly and maintenance consisting of "pump[ing] or vacuum[ing]"; the "maximizer settling chamber" requires inspection biannually and maintenance consisting of "vacuum[ing] or inject[ing] water, suspend silt and pump chamber"; and the "chamber" requires inspection annually and the same maintenance as the maximizer settling chamber. The proposed system includes the water quality inlet and one of the two types of chambers. By Notice of Intent to Issue dated November 5, 1998, DEP provided notice of its intent to issue the New Permit and certification of compliance with state water quality standards, pursuant to Section 401 of the Clean Water Act, 33 United States Code Section 1341. On February 6, 1999, DEP revised the notice of intent by withdrawing its certification of state water quality compliance. As it did with the Original Permit, DEP again waived state water quality certification. This waiver is consistent with a letter dated February 2, 1998, in which then-DEP Secretary Virginia Wetherell announced that DEP would waive state water quality certification for all activities in which the agency issues an ERP based on the "net improvement" provisions of Section 373.414(1)(b), Florida Statutes. The notices of intent (collectively, NOI) recite the recent permitting history of the marina. This history includes the Original Permit, a since-expired MSSW permit issued in 1988 by SFWMD, and then-pending requests--apparently all since granted--to revise the Original Permit by replacing the flushing canal with culverts, relocating a travel lift from the main canal to the north canal, and adding liveaboards to the marina. (Although mentioned below, these revisions, in and of themselves, do not determine the outcome of DOAH Case No. 98-5409.) Reviewing the proposed development for the site, the NOI states that the northerly part of the project would contain an indoor dry boat storage barn, a marina service operation consisting of a ship store and miscellaneous buildings, a harbor master building, an upgraded fueling facility, a parts and service center, a restaurant, retail and commercial facilities, and paved parking areas. The southerly part of the project would contain a new indoor dry boat storage barn, a boat dealership building, and paved parking areas in place of the existing buildings. The NOI states that the proposed water quality treatment system would comprise dry detention systems of several underground vaults with an overall capacity based on the total impervious area, including roofs, receiving 2.5 inches of rain times the percentage of imperviousness. Given the relatively high imperviousness of the finished development, this recommended order considers the percentage of imperviousness to be 100, but ignores the extent to which the post-development pervious surfaces would absorb any rainfall. For storms producing up to 2.5 inches of runoff, the proposed surface water management system, of which the underground vaults are a part, would trap the runoff and provide treatment, as sufficiently sized contaminants settled into the bottom of the vaults. Because the vaults have unenclosed bottoms, the proposed system would provide incidental additional treatment by allowing stormwater to percolate through the ground and into the water table. However, the system is essentially a dry detention system, and volumetric calculations of system capacity properly ignored the incidental treatment available through percolation into the water table. The New Permit notes that the wet season water table is 1.2 feet NGVD, and the bottom of the dry detention system is 2.5 feet NGVD. This relatively thin layer of soil probably explains why DEP's volumetric calculations ignored the treatment potential offered by percolation. The relatively high water table raises the possibility, especially if Applicant does not frequently remove the settled contaminants, that the proposed system could cause groundwater contamination after the thin layer of soil is saturated with contaminants. In any event, the system is not designed for the elimination of the settled contaminants through percolation. The treatment system for the boat wash areas would be self-contained, loop-recycle systems that would permit the separation of oil and free-settling solids prior to reuse. However, the NOI warns that, "during heavy storm events"-- probably again referring to more than 2.5 inches of runoff--the loop-recycle systems would release untreated water to one of the underground vaults, which would, in turn, release the untreated water into the canals. Due to the location of the boat wash areas, the receiving waters would probably be the north canal. As reflected in the drawings and the testimony of Mr. Wright, the surface water management system would discharge at three points: two in the north canal and one in the south canal. (Vol. I, p. 206; future references to the Transcript shall cite only the volume and page as, for example, Vol. I, p. 206). 67. The NOI concludes that Applicant has provided affirmative reasonable assurance that the construction and operation of the activity, considering the direct, secondary and cumulative impacts, will comply with the provisions of Part IV of Chapter 373, F.S., and the rules adopted thereunder, including the Conditions for Issuance or Additional Conditions for Issuance of an environmental resource permit, pursuant to Part IV of Chapter 373, F.S., Chapter 62-330, and Sections SFWMD--40E-4.301 and 40E-4.302, F.A.C. The construction and operation of the activity will not result in violations of water quality standards and will not degrade ambient water quality in Outstanding Florida Waters pursuant to Section 62-4.242, F.A.C. The Applicant has also demonstrated that the construction of the activity, including a consideration of the direct, secondary, and cumulative impacts, is clearly in the public interest, pursuant to Section 373.414(1)(a), F.S. However, the design capacity of the proposed surface water management system raises serious questions concerning the water quality of the discharges into the canals. Mr. Wright initially testified that the surface water management system would be over-taxed by "an extreme storm event, probably a 25- year storm event . . .." (Vol. I, pp. 208-09). The record contains no evidence of the frequency of the storm event that produces 2.5 inches of runoff for the relatively impervious post- development uplands; the record contains no evidence even of the frequency of the storm event that produces 2.5 inches of rainfall. According to Mr. Wright, the 25-year storm would typically produce 8-10 inches of rain. (Vol. I, pp. 223 and 233). As already noted, the relatively large area of imperviousness following upland development and the relative imperviousness of the upland soils present at the site suggest that the runoff will be a relatively large percentage of the rainfall produced by any given storm event. It thus appears that the design capacity of the system is for a storm substantially smaller and substantially more frequent than the 25-year storm. Attached to the NOI is a draft of the New Permit, which contains numerous specific conditions and conforms in all respects with the NOI. Omitting any mention of SFWMD's Basis of Review, the New Permit addresses, among other things, the operation, inspection, and maintenance of the components of the proposed system. As set forth in the testimony of Michael Bateman, who is a Professional Engineer III and statewide stormwater coordinator for DEP, the surface water management system's operation depends on periodic pumping of the "thick, fine sediment," which appears to be a "cross between mud and sand" and will be laden with oil, grease, metals, and other contaminants. (Vol. II, p. 66). However, contrary to Mr. Bateman's assurance that the New Permit requires the periodic pumping or removal of contaminants that have precipitated out of the runoff in the dry detention system and dropped to the bottom sediment (Vol. II, p. 20), neither the NOI nor the New Permit requires, in clear and enforceable language, the periodic removal of settled solids from the underground vaults or their manner of disposal. New Permit Specific Condition 8 requires that Applicant maintain the boat wash area in "functioning condition," although specific inspection and maintenance requirements are omitted from the New Permit. New Permit Specific Condition 7 requires that Applicant "inspect and clean" all stormwater inlets "as necessary, at least once a month and after all large storm events," although the New Permit fails to specify that cleaning shall be by either pumping or vacuuming. By contrast to the marginally adequate inspection and maintenance provisions applicable to the boat wash area (inspections are required in Specific Condition 6, cited below) and stormwater inlets, the New Permit completely fails to specify enforceable inspection and maintenance requirements for the underground vaults. New Permit Specific Condition 6 addresses the operation of the vault as follows: Upon completion of the construction of the stormwater collection and underground vault (Infiltrator) systems and on an annual basis thereafter by September 30 of each year, the Permittee shall submit reports to the Department as to the storage/treatment volume adequacy of the permitted system. The reports shall also include, but not be limited to, the condition of stormwater inlets and control structures as to silt and debris removal and the condition of the inlet wire mesh screens to function properly. The boat wash down areas shall be inspected for proper operation, i.e., no signs of wash water overflows from the containment area, condition of the containment area curbing, etc. Such reports shall include proposal of technique and schedule for the maintenance and/or repair of any deficiencies noted and shall be signed and sealed by a Florida registered Professional Engineer. A report of compliance with the aforementioned proposal shall be submitted by the Professional Engineer to the Department upon completion of the proposed work which shall be accomplished within three months of the initial report for each year. New Permit Specific Condition 6 requires annual reports concerning the sufficiency of the capacity of the underground vaults (first sentence), annual reports of the status of silt- and debris-removal from the inlets and control structures and the condition of the inlet wire mesh screens (second sentence), inspection at no stated intervals of the boat wash area (third sentence), and annual reports with suggestions of maintenance schedules and repairs for the items mentioned in the first two sentences (fourth sentence). New Permit Specific Condition 6 promises only the preparation of a maintenance schedule at some point in the future. Failing to supply an enforceable inspection and maintenance program, Specific Condition 6 indicates that Applicant shall consider in the future techniques and scheduling of maintenance, presumably based on the report concerning system capacity. Such a requirement may or may not impose upon Applicant an enforceable obligation to adopt an enforceable inspection and maintenance program in the future, but it does not do so now. There is no reason why the New Permit should not impose upon Applicant an initial, enforceable inspection and maintenance program incorporating, for example, the clear and enforceable requirements that Applicant inspect all of the underground vaults no less frequently that once (or twice, if this is the applicable recommendation of the manufacturer) annually and, at clearly specified intervals, remove the sediments by resuspending the sediments in the water, pumping out the water, and disposing of the effluent and sediments so they do not reenter waters of the state. Although the record does not disclose such requirements, Applicant could possibly find manufacturer's recommendations for the boat wash components and incorporate them into an enforceable inspection and maintenance program more detailed than that contained in Specific Condition 8. However, for the reasons noted below, water quality considerations require a substantial strengthening of such a program beyond what is set forth in this paragraph as otherwise acceptable. At present, the bottom line on inspection and maintenance is simple: the New Permit does not even incorporate by reference the manufacturer's recommended inspection and maintenance schedule, which Mr. Wright provided to Mr. Myers. Nor was this shortcoming of the New Permit in its treatment of inspection and maintenance necessarily missed by Mr. Wright. He testified that he submitted to DEP the manufacturer's maintenance program (Vol. I, p. 205), but when asked, on direct, if the "permit in any way incorporate[s] the commitment in your application to this maintenance?" Mr. Wright candidly replied, "That I don't know." (Vol. I, p. 206). Satisfaction of Basis of Review Section 5 Basis of Review Section 5--specifically Section 5.2.1(a)--imposes the "volumetric" requirement of 2.5 inches times the percentage of imperviousness, as discussed above and in the conclusions of law. Petitioner does not dispute Applicant's compliance with this volumetric requirement, and the record amply demonstrates such compliance. Applicability of Basis of Review Section 4 The main issues in this case are whether the environmental and water quality requirements of Basis of Review Section 4 apply to the direct, secondary, and cumulative impacts of the proposed activity. Because the record lacks any indication of other relevant pending or vested permits, without which, as noted in the conclusions of law, one cannot assess cumulative impacts, the remainder of the findings of fact will not discuss cumulative impacts, although, to some extent, increased boating pressure constitutes a secondary impact and a cumulative impact. Without regard to the differences between direct and secondary impacts, DEP has taken the position in this case that it could lawfully issue the New Permit upon satisfaction of the volumetric requirements of Basis of Review Section 5 and without consideration of the requirements of Basis of Review Section 4. In large part, DEP's witnesses justify this position by reliance on the historic differences between DAF permits and SWM permits and the fact that the New Permit is a former-SWM ERP. As discussed in detail in the conclusions of law, the Basis of Review imposes different requirements upon former-DAF and former-SWM ERPs, although the Basis of Review does not refer to DAF or SWM permits by their former names. The identifying language used in the Basis of Review for former-DAF ERPs is "regulated activity" "located in, on, or over surface waters or wetlands." References to "regulated activity" without the qualifying clause indicate that the following requirement applies to former-DAF ERPs and former-SWM ERPs. Several witnesses for DEP and Applicant testified that Applicant was entitled to the New Permit upon satisfaction of the volumetric requirements of Basis of Review Section 5. For example, Mr. Wright testified that the water quality requirements for the New Permit required only a "cookbook calculation" to determine volume. (Vol. I, p. 204). Agreeing with a question that analysis of the water quality portion of the system requires "simply a straightforward mathematical calculation," Mr. Wright testified that the quality of discharged water, following treatment, will comply with state water quality standards in storms producing no more than 2.5 inches of runoff. (Vol. I, pp. 210-11). When asked to explain his answer, Mr. Wright testified, "It's kind of an implied situation, in that if you follow the guidelines that you are required to follow with respect to the calculations of water quality, that the end product is going to be in compliance with state standards." (Vol. I, p. 211). DEP witnesses agreed with Mr. Wright's analysis. For instance, Mr. Bateman testified, "The stormwater portion of the Basis of Review gets at that question [meeting water quality standards] by stating, 'if you follow the design criteria in the basis, you are presumed to meet water quality standards.'" (Vol. II, p. 40). Mr. John Iglehart, the program administrator for DEP's South District Office in Fort Myers, testified on the same point: "if . . . you meet the criteria, the engineering criteria, than you have met the presumption that you meet the rule." (Vol. III, p. 52). Mr. Myers also agreed, testifying, "with the stormwater management system, it's for the most part, let's say, fairly cut and dried as far as meeting criteria that is established within these rules and Basis of Review." (Vol. III, p. 144). He added: "Since the criteria for reviewing stormwater management systems and the discharge is based upon a presumed compliance with stormwater criteria and with state water quality, it is presumed it [the proposed system] does meet it." (Vol. III, p. 148). Mr. Bateman explained the historic basis for the water quality presumption given surface water management systems that meet the volumetric requirements: the ERP is a combination of the surface water management rules and the environmental . . ., the dredge-and-fill, and they didn't merge, they didn't marry very well in certain areas. In stormwater we look at--it's a technology- based criteria. We say, "If you build it this way, treat 80 percent of the average annual pollutant load, we're going to give you the permit on the presumption that you're doing the best you can. You're going to meet standards. Once you get into the wetlands, we take--we put on whole new sets of glasses. ALJ: Are you saying that the old dredge-and- fill is more performance-based, and the old MSSW is more technology-based, in that if you've put in the required technology, you've done your job? WITNESS: That is--yes. Dredge-and-fill is a more case by case. We look at the water quality. We look at ambient conditions. We look at hydrographics [here, largely tidal flushing]. It's more like a waste load allocation in that we're very specific. In stormwater, we can't afford to be. MS. HOLMES: So what you're saying is you can't point to the specific rule provision or regulation that excludes these criteria from surface water management systems? WITNESS: Well, you have to read [Basis of Review] Section 4 as a whole. 4.1 is specific to wetlands and other surface waters. 4.2 is environmental review. I mean, if you look at the thing in total, and the--and I realize it's confusing. But these rules are exactly the same in all the water management districts. They were developed together as the wetland criteria, the new dredge-and-fill criteria. They're exactly the same. The stormwater rules of all the [water management districts] is all different. That is for another day, making those all consistent. So these environmental wetland- type dredge-and-fill criteria are all the same, and they refer to in-water impact. [All references in the transcript to "end water" should have been "in-water."] ALJ: What do you mean by that term, "in- water impact?" WITNESS: In other words, dredge-and-fill impact. Construct and--I can't-- MS. HOLMES: May I continue, then? ALJ: Let him answer. What were you going to say? WITNESS: I think it takes a little knowledge of how these [rules] developed to know how they're applied, unfortunately. In other water management districts, it's clearer that these are in-water impacts. (Vol. II, pp. 57-59). In testifying to the exclusivity of the volumetric requirements in Basis of Review Section 5, with respect to former-SWM ERPs, these witnesses likewise opined that the secondary-impact analysis required in Basis of Review Section 4 also was inapplicable to the New Permit. For example, after testifying both ways on the necessity of considering secondary impacts in issuing former-SWM ERPs, Mr. Bateman concluded, "I'm not sure that [the requirement of considering secondary impacts] applies in this case. Certainty the rules apply, I mean, the rules apply. But certain rules are not applicable in this particular instance. I mean, I'm trying to think of a secondary impact associated with stormwater system, and it's difficult for me to do so." (Vol. II, p. 45). Mr. Bateman then testified that DEP did not consider such secondary impacts, as additional boat traffic, and probably did not consider cumulative impacts, such as other marinas. (Vol. II, pp. 51-52). In response to a question asking to what extent DEP considered post-development inputs of contaminants, such as heavy metals, when issuing a former-SWM ERP, Mr. Bateman testified: I have to tell you, very little. I mean, we--stormwater is pretty black and white. The link to secondary and cumulative impact is generally associated with in-water impact. And I realize the line is a little grey here. When we build a Wal-Mart, we don't think about how many cars it's going to put on [U.S. Route] 41 and what the impact might be to an adjacent lake. We just don't. It would be a little burdensome. In this case, I mean, it's a little greyer. (Vol. II, p. 47). Mr. Bateman was then asked to compare the relative impacts from a vacant, but developed, upland without a surface water management system with a proposed activity that would add a surface water management system to facilitate an intensification of land uses on the site so as to add new contaminants to the runoff. Mr. Bateman testified that DEP would apply only the volumetric requirement and not address the complex issue of weighing the potential environmental benefit of a new surface water system against the potential environmental detriment of contaminant loading (at least in storm events greater than the design storm event). Mr. Bateman explained: "The way it works, it is not a water quality-based standard. In other words, we don't go in and say it's so many pounds [of contaminants] per acre per year now. We're going to make it this many pounds per acre per year, and look at it in a detailed fashion. We do the [Best Management Practices], retain an inch and you're there." (Vol. II, p. 49). Agreeing with Mr. Bateman that DEP was not required to consider secondary impacts resulting from the regulated activity, Mr. Iglehart testified: "It's our thought that we don't really look at secondary and cumulative impacts for the stormwater permit. . . . If it [the former-SWM ERP application] meets the criteria, it gets the permit. That--in the ERP, the previous dredge-and-fill side looks at the secondary and cumulative. The stormwater just--like Mr. Bateman testified." (Vol. III, p. 52). After some ambivalence, Mr. Myers also testified that DEP was not required to consider secondary impacts for the New Permit: WITNESS: . . . I did not or I do not consider secondary impacts for the stormwater management system. MS. HOLMES: So, what about cumulative impacts? WITNESS: No. MS. HOLMES: So it's your testimony that you did not review secondary and cumulative impacts-- WITNESS: That's correct. MS. HOLMES: --of this system? WITNESS: What I can say is that the existing system out there, from what I can tell, does not have any stormwater treatment. Basically, it's running off into the canals. The proposed project will provide stormwater treatment for, not only the new construction, which is proposed mainly on the northern peninsula, but it is also provided for that area which is now existing, it will provide stormwater treatment for that area also. And I consider that--I don't consider that to be a secondary impact. I see it as an offsetting improvement to potential as far as the water quality. (Vol. III, pp. 144-45). As discussed in detail in the conclusions of law, these witnesses have misread the provisions of the Basis of Review applicable to the New Permit. As noted in the conclusions of law, the requirements in the Basis of Review of analysis of secondary and cumulative impacts upon water quality and manatees are not limited to in-water or former-DAF activities. Satisfaction of Basis of Review Section 4 Direct vs. Secondary Impacts In terms of construction, the direct impacts of the proposed surface water management system are negligible. Nothing in the record suggests that the construction of the proposed system will violate any of the requirements of Basis of Review Section 4. In terms of maintenance, the direct impacts of the proposed surface water management system are negligible, except for the omission from the New Permit of any provision for the safe disposition of the contaminant removed from the underground vaults. However, the maintenance issues are better treated with the operation issues. In terms of operation, the direct impacts of the proposed surface water management system are substantial. As discussed in the conclusions of law, the analysis of the direct impacts of the operation of the proposed system is limited to the current level of uplands and marine activity at the marina. These direct impacts involve two aspects of the operation of the proposed system: the design capacity and the inspection and maintenance (including disposal of sediment) of the system components. As discussed in the conclusions of law, the secondary impacts involve the intended and reasonably expected uses of the proposed system. These impacts consist of the increased uplands and marine uses associated with the addition of 100 new wet slips, 227 new dry slips, and 115,000 square feet of building space with a restaurant. Apart from their contention that Applicant is required only to satisfy the volumetric requirements of Basis of Review Section 5, Applicant and DEP have contended that Petitioner is estopped from raising direct and secondary impacts because DEP considered these impacts when issuing the Original Permit four years ago. Perhaps the most obvious factual problem with this contention is that it ignores that the New Permit authorizes, for the first time, the construction of the 227 new dry slips and 115,000 square feet of buildings. As counsel for DEP pointed out during the hearing, the Original Permit was a DAF permit and did not extend to these upland uses. The contention that DEP considered these developments as secondary impacts because they were shown on drawings attached to the Original Permit gives too much significance to nonjurisdictional background items shown in drawings without corresponding textual analysis. More generally, the efforts of DEP and Applicant to restrict the scope of this case rely on a misreading of Original Permit Specific Condition 5. The purpose of Original Permit Specific Condition 5 is to "ensure a net improvement to water quality." The purpose of each of the requirements under Specific Condition 5 is to achieve an actual, not presumptive, improvement in water quality. Prohibiting the issuing agency from fully analyzing the direct and secondary impacts of the proposed surface water management system reduces the likelihood that the ensuing New Permit will perform its role, as envisioned in the Original Permit, of helping to achieve an actual, net improvement in water quality. The concept of a "net" improvement is exactly what DEP's witnesses disclaim having done in this case--balancing the potential environmental benefits to the water resources from the proposed surface water management system against the potential environmental detriments to the water resources from the development and land uses that are intended or reasonably expected to result from the construction of the proposed system. The failure to analyze the net gain or loss inherent in this important provision of Specific Condition 5.B undermines the likelihood that the effect of Specific Condition 5.B--a net improvement in water quality--will be achieved. It is therefore illogical to rely on Specific Condition 5.B, as DEP does, as authority for an artificially constrained analysis of the eligibility of the proposed system for a former-SWM ERP. The estoppel argument also ignores that Original Permit Specific Condition 5.B anticipated that the issuing agency would be SFWMD. It is unclear how the parties to the Original Permit, including DEP, would bind what appeared at the time to have to be SFWMD in the exercise of its lawful authority in issuing SWMs or former-SWM ERPs. The attempt of Applicant and DEP trying to limit the scope of this case also overlooks numerous changed circumstances since the issuance of the Original Permit. Changed circumstances militating in favor of the comprehensive analysis mandated for former-SWM ERPs include: increased trends in manatee mortality; increased boating pressure; persistent water quality violations in terms of dissolved oxygen, copper, and total coliform bacteria; a dramatic deterioration in dissolved oxygen levels; the initial presentation for environmental permitting of the previously unpermitted 227 additional dry slips and the 115,000 square feet of buildings; the current canal bottom profiles resulting from excessively deep maintenance dredging; the absence of an updated flushing study; and the failure to dredge the flushing canal required by the Original Permit. Disregarding the environmental and water quality requirements of Basis of Review Section 4 in this case would thus repudiate Specific Condition 5.B, especially when, among other things, the water quality of the canals has deteriorated dramatically with respect to dissolved oxygen, the canals continue to suffer from serious copper violations, the canals were recently maintenance dredged to excessive depths, no flushing study has examined these subsequent developments, and the intended uses to be facilitated by the New Permit more than double the capacity of the existing marina. 2. Water Quality The direct impacts of the proposed surface water management system, based on current levels of uplands and marine use at the marina, would adversely affect the quality of the receiving waters, in violation of Basis of Review Section 4.1.1(c). The excessively increased depths of the canals, especially with respect to the substantially widened depths of the north canal, raise the potential of water quality violations, especially given the history of this site. Potential sources of contaminants exist today in the canal bottoms, uplands, and marine activity associated with the marina. The potential for water quality violations, especially with respect to dissolved oxygen, increases in the absence of an updated flushing study. The potential also increases with the introduction of liveaboards and failure to dredge the flushing canal (or its replacement with culverts). In the face of these current threats to water quality, the New Permit fails to require a system with adequate capacity to accommodate fairly frequent storm events and fails to impose clear and enforceable inspection, maintenance, and disposal requirements for the underground vaults. Although better, the inspection and maintenance requirements for the stormwater inlets and boat wash area unnecessarily present enforcement problems. The effect of these failures in design capacity and inspection and maintenance is synergistic. Deficiencies in vault capacity mean that storms will more frequently resuspend the settled contaminants in the vaults and flush them out into the canal waters. Excessively long maintenance intervals and poor maintenance procedures will increase the volume of contaminants available to be flushed out into the canal waters. Improper disposition of removed contaminants endangers other water resources. The introduction of untreated or inadequately treated water into the canals means the introduction of two substances that will contribute to the current water quality violations. Organics, such as from the boat wash operations and other uplands uses, will raise biochemical oxygen demand, which will accelerate the deterioration in dissolved oxygen levels. Copper removed during boat wash operations, leaching from painted hulls, or remaining in the uplands from past marina operations will also enter the canals in this fashion. On these facts, Applicant has failed to provide reasonable assurance that the operation of the proposed surface water management system will not result, in the long-term, in water quality violations. Applicant has failed to demonstrate that the operation of the proposed system, even as limited to existing levels of use of the uplands and marine waters, will not contribute to existing violations of dissolved oxygen and copper levels. Obviously, the situation is exacerbated by consideration of the uses intended and reasonably expected to follow the construction of the proposed system. With the growing popularity of boating in Lee County over the past 20 years, it is reasonably likely that an expanded marina operation, located close to downtown Fort Myers, will successfully market itself. Thus, many more boats will use the marina because it will offer more wet and dry slips and new buildings, including a restaurant, and the pressure on water quality will intensify with the intensification of these uses. The added intensity of upland and marine uses will contribute to the above-described violations of water quality standards for dissolved oxygen and copper, probably will contribute to the above-described violations of water quality standards for total coliform bacteria and lead, and may contribute to the recurrence of water quality violations for other parameters for which the canals were previously in violation. On these facts, Applicant has failed to provide reasonable assurance that the direct and secondary impacts of the proposed system will not adversely affect the water quality of the canals. 3. Manatees and Manatee Habitat By letter dated June 26, 1998, from a DEP Environmental Specialist to a DEP permitting employee, the Environmental Specialist provided an initial opinion concerning the revisions that Applicant sought to the Original Permit so as to allow liveaboards, replace the flushing canal with culverts, and relocate the travel lift to the north canal. The letter accompanies a Manatee Impact Review Report, also dated June 26, 1998. The Manatee Impact Review Report notes the pending application for the New Permit. The report considers at length the extent of manatee use of Deep Lagoon and the nearby portions of the Caloosahatchee River. The Manatee Impact Review Report states: This project [i.e., the relocation of the boat lift to the north canal, addition of liveaboards, and conversion of the flushing canal to flushing culverts] is expected to add a significant number of boats to this system, significantly increase the level of boat traffic, and change boat traffic patterns in the study area. The vessels from this project are expected to produce significant adverse impacts to manatees that use the Deep Lagoon in the immediate vicinity of the project, as well as in the boater's sphere of influence of the project. Secondary adverse impacts include lethal and sublethal watercraft-related injuries, disturbance contributing to stress, and alteration of natural behaviors. The secondary impacts expected with this project are compounded by the cumulative secondary effects from other facilities in this system. Just south of this project site, another marina was recently constructed (Sun City Corporation aka Gulf Harbor Marina aka River's Edge), which has approximately 190 wet slips. Since October 1995, there have been seven watercraft-related deaths within five miles of this project location. The Gulf Harbor Marina was constructed in late 1995, and was almost fully occupied during 1996. Watercraft-related manatee deaths increased significantly during this time, with one in December 1995, two in 1996 and four in 1997. Additional on-water enforcement by the City of Cape Coral was considered part of the offsetting measures to address the expected impacts to manatees from increases in boat density. This offsetting measure, however, appears to be ineffectual at this time. The Manatee Impact Review Report concludes that the north canal and its mouth are "particularly important" for manatee because of the availability of freshwater from the adjoining Iona Drainage District ditch immediately north of the north canal and "historical use indicates that this area appears to be the most frequently used area in the Deep Lagoon system." The report cautions that the relocated travel lift may significantly increase the number of boats in the little-used north canal, whose narrowness, coupled with moored, large boats on the one side, "would produce significant, adverse impacts to the endangered manatee." The Manatee Impact Review Report finds that Applicant failed to provide reasonable assurance regarding the conservation of fish and wildlife, unless several new conditions were added. These conditions include prohibitions against boat launching along the shoreline of the north canal and the addition of manatee-exclusion grating to any culverts that may be approved. As defined in this recommended order, the direct impacts upon manatees from the proposed surface water management system would be moderate. As defined in this recommended order, direct impacts would not involve any increase in boating pressure. The greater impacts would be in the deterioration of two measures of water quality that are crucial to manatees: dissolved oxygen and copper. However, the secondary impacts are dramatic, not de minimis, and arise from the intended and reasonably expected uses to follow from the construction of the proposed surface water management system. The increased boat traffic intended and reasonably expected from more than doubling the marina capacity, through the addition of 100 wet slips and 227 dry slips, and the addition of 115,000 square feet of buildings, including a restaurant, would adversely impact the value of functions provided to manatees by the affected surface waters. Manatee mortality has increased as boat traffic has increased. Substantial numbers of boaters have ignored speed limits. Quality manatee habitat in this critical area along the Caloosahatchee River is not plentiful. On these facts, Applicant has failed to provide reasonable assurance that the secondary impacts of the proposed system will not adversely impact the abundance and diversity of wildlife and listed species, of which manatees are one, and the habitat of wildlife and listed species. 4. Minimization and Mitigation Due to their contention that Basis of Review Section 4 does not apply to this case, DEP and Applicant did not demonstrate compliance with the minimization and mitigation sections of Basis of Review Section 4. However, the record supports the possibility of design alternatives for water quality impacts, if not manatee impacts, that DEP and Applicant must consider before reanalyzing the direct, secondary, and cumulative impacts of the proposed system on the water resources and, if appropriate, potential mitigation options. Mr. Bateman testified that SFWMD is the only district that permits surface water management systems relying on the settling out of sediments in the bottom of a storage-type detention system. (Vol. II, p. 18). He explained that other districts rely on systems that, taking advantage of the three to four feet typically minimally available between ground surface and the top of the water table, retain the runoff and allow it to percolate into the ground. (Vol. II, p. 19). One relatively straightforward design alternative, which would address water quality issues, would be to perform a flushing study; analyze applicable drainage level of service standards imposed by state, regional, and local authorities; and increase the capacity of the surface water management system to accommodate the runoff from storms of sufficient size and frequency that would be accommodated by the proposed system. Another feature of this design alternative would be to impose for each component of the system a detailed, enforceable program of inspection, maintenance, and contaminant-disposal. This program would incorporate the manufacturer's recommendations for the manner and minimum frequency of inspection and maintenance, but would require more frequent removal of contaminated sediments during periods when larger storms are more numerous (e.g., a specified wet season) or more intense (e.g., a specified hurricane season), as well as any periods of the year when the marine and upland uses are greatest (e.g., during the winter season, if this is the period of greatest use). As testified by Mr. Bateman, the proximity of the water table to the surface, as well as South Florida land costs, discourage reliance upon a conventional percolation-treatment system, even though the site's uplands are 5 feet NGVD and the water table is 1.2 feet NGVD. The bottom of the proposed system is 2.5 feet NGVD, which leaves little soil for absorption. If the nature of the contaminants, such as copper, does not preclude reliance upon a percolation-treatment system, DEP and Applicant could explore design alternatives that incorporate more, shallower vaults, which would increase the soil layer between the bottom of the vaults and the top of the water table. If the technology or contaminants preclude reliance upon such an alternative, the parties could consider the relatively costly alternative, described by Mr. Bateman, of pool-like filters with an "actual filtration device." (Vol. II, pp. 19-20). The preceding design alternatives would address water quality concerns, including as they apply to manatees, but would not address the impact of increased boating upon manatees. The record is not well developed in this regard, but DEP and Intervenor have considerable experience in this area, and it is premature to find no suitable means of eliminating or at least adequately reducing the secondary impacts of the proposed system in this crucial regard as well. In any event, Applicant has failed to consider any design alternatives to eliminate or adequately reduce the direct and secondary impacts of the proposed surface water management system. Having failed to consider minimization, DEP and Applicant have failed to identify the residual direct and secondary impacts that might be offset by mitigation. Applicant has thus failed to mitigate the direct and secondary impacts of the proposed surface water management system.

Recommendation It is RECOMMENDED that the Department of Environmental Protection enter a final order revoking its determination of an exemption for maintenance dredging in DOAH Case No. 98-3901 and denying the application for an environmental resource permit in DOAH Case No. 98-5409. DONE AND ENTERED this 24th day of November, 1999, in Tallahassee, Leon County, Florida. ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of November, 1999. COPIES FURNISHED: Kathy Carter, Agency Clerk Office of the General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Teri Donaldson, General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 T. Elaine Holmes, Attorney 14502 North Dale Mabry, Suite 200 Tampa, Florida 33618 David Gluckman Gluckman and Gluckman 541 Old Magnolia Road Crawfordville, Florida 32327 Matthew D. Uhle Humphrey & Knott, P.A. 1625 Hendry Street Fort Myers, Florida 33901 Francine M. Ffolkes Senior Assistant General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000

USC (1) 33 U. S. C. 1341 Florida Laws (9) 120.57373.046373.069373.413373.414373.4142373.416403.813408.813 Florida Administrative Code (17) 40E-1.61140E-4.03140E-4.05140E-4.10140E-4.30140E-4.30240E-4.30340E-4.32140E-4.34140E-4.36140E-40.03140E-40.06140E-40.32140E-40.35162-312.05062-330.20062-4.242
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer