Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION vs DONALD CLARK, 02-000978 (2002)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Mar. 01, 2002 Number: 02-000978 Latest Update: Dec. 01, 2003

The Issue The issue in this case is whether Respondent committed the acts alleged in the Administrative Complaint and if so, what penalty is appropriate.

Findings Of Fact Based upon the testimony of the witnesses and the evidence presented and the entire record in this proceeding, the following material and relevant facts are found. At no time material hereto was Respondent, Donald Clark, licensed by the State of Florida Construction Industry Licensing Board to engage in construction contracting. At no time material hereto was Cancun Development Company ever qualified or certified by any State of Florida agency as a certified contractor. With knowledge of that he was not licensed by the State of Florida to solicit, engage in, nor contract for construction work, Respondent entered into an oral agreement with homeowner Ms. Eichar to build a second-story addition to her home, located in Indian Rocks Beach, Florida, for a contract price of $30,000.00. Respondent, who was paid by Ms. Eichar a total of $25,000.00, subcontracted with Mr. Erwin, a licensed electrical contractor, to do the electrical work at the Eichar's residence for $2,364.00. Respondent, after notice, failed to attend the formal final hearing regarding this matter. The investigative and prosecution costs to the Department of Business and Professional Regulation, excluding cost associated with attorney time, were $550.00.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is recommended that a final order be entered by the Department as follows: Finding Respondent, Donald Clark, guilty of having violated Subsection 489.127(1)(f), Florida Statutes, as alleged in the Administrative Complaint herein filed and imposing as a penalty an administrative fine in the amount of $5,000.00. Assess costs of investigation and prosecution, excluding costs associated with an attorney's time, in the amount of $550.70. DONE AND ENTERED this 23rd day of July, 2002, in Tallahassee, Leon County, Florida. FRED L. BUCKINE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 23rd day of July, 2002. COPIES FURNISHED: Donald Clark 813 East Bloomingdale Avenue Suite 252 Brandon, Florida 32720 Brian A. Higgins, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202 Hardy L. Roberts, III, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-2202

Florida Laws (3) 120.57455.228489.127
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. PELLE J. LINDQUIST, 77-000147 (1977)
Division of Administrative Hearings, Florida Number: 77-000147 Latest Update: Jun. 03, 1977

Findings Of Fact On February 27, 1974, Pelle J. Lindquist contracted with Patrick G. Yeager to build a house on Concord Road in Ormond Beach, Florida. This contract was admitted in evidence as petitioner's Exhibit No. 1. The contract called for work to begin on March 1, 1974, and to be completed within 90 days. Work did not begin on March 1, 1974, but did begin in the latter half of March, 1974. Frequent rain in March, 1974, caused the roof to warp, so that it had to be replaced. After considerable delay in undertaking the repair, actually replacing the roof took only about a week. Replacing the roof added significantly to respondent's costs in performing under the contract. Eleven months after construction began, Mr. Yeager moved in. Because the kitchen and both bathrooms lacked wallpaper, and because the gravel yard was partly unfinished, respondent Lindquist paid Mr. Yeager $300.00, in exchange for which Mr. Yeager released Mr. Lindquist from all liability in connection with the house. The release was admitted in evidence as respondent's Exhibit No. 1. In the course of construction, Haven Vaughn, a sub- contracting carpenter, filed a notice of intent to lien on behalf of himself and his partner, Cal Fisher. As long as Mr. Lindquist was allowed draws on the construction loan, Messrs. Vaughn and Fisher were paid regularly. For reasons which were not developed in the evidence, the lender withheld part of the loan proceeds from respondent. When the draws stopped, the carpenters were not paid, and they stopped work on the Yeager house. The lender ultimately paid the carpenters in full. At the time Mr. Yeager contracted with Mr. Lindquist for the house, Mr. Lindquist entered into a separate agreement with Mr. Cameron, a real estate broker who introduced Mr. Lindquist to Mr. Yeager. Under the latter agreement, Mr. Lindquist was to pay Cameron Realty Company a brokerage fee upon "obtaining last draw from lending firm." The brokerage fee has not been paid and is currently the subject of civil litigation. On February 15, 1974, Mr. and Mrs. Horace N. Smith, Jr., contracted with respondent for the construction of a house on another lot on Concord Road in Ormond Beach, Florida. This contract was admitted in evidence as petitioner's Exhibit No. 2. The contract called for completion of the Smith house on or about June 15, 1974. After the contract was signed, the Smiths returned to New Jersey, entrusting oversight of the project to Mr. Cameron, a real estate broker who introduced Mr. Lindquist to the Smiths. As construction progressed, Mr. Cameron kept Mrs. Smith advised, and she mailed installment payments on the strength of Mr. Cameron's representations. In this fashion, Mr. Lindquist was paid 75 percent of the total contract price of $27,600.00. For reasons which were not developed in the evidence, the Smiths stopped payments under the contract, presumably at Mr. Cameron's suggestion. When the payments stopped, work on the house also stopped, and, during the ensuing hiatus in construction, vandals broke a glass door, scrawled obscenities on the walls, scraped the walls, damaged the outside doors, and ruined the wooden trim. Work had fallen far behind schedule when, in April of 1975, a lawyer retained by Mr. and Mrs. Smith wrote Mr. Lindquist to the effect that the Smiths would take over the project unless it was finished within a week. When the week had passed, the Smiths began dealing directly with the sub-contractors, the house was eventually completed at a total cost to the Smiths of $29,100.00, or $1,500.00 more than the Smiths had agreed to pay Mr. Lindquist for the job. As completed, the house lacked an electric garage door opener and a sprinkler system which Mrs. Smith guessed would cost $1,000.00, but no competent evidence as to the cost or value of either the door opener or the sprinkler system was adduced. Vandalism added significantly to the cost of the Smith house. Mr. Lindquist replaced a glass door broken by vandals. On account of the vandalism, the Smiths paid the carpenters an additional $300.00 for their labor. The front doors, the trim, and all bays had to be replaced; the cost of replacement materials was not established. At the time Mr. and Mrs. Smith contracted with Mr. Lindquist for the house, Mr. Lindquist entered into a separate agreement with Mr. Cameron. Under the latter agreement, Mr. Lindquist was to pay Cameron Realty Company a brokerage fee. The brokerage fee has not been paid and is currently the subject of civil litigation. Certified general contractors' licenses are renewable annually in June, pursuant to Section 468.108, Florida Statutes (1975). Mr. Lindquist had such a license for 1974-75. In June of 1975, he desired to renew his license, but in a fashion which would authorize him to contract on behalf of a corporation, rather than as an individual. He telephoned the Jacksonville office of the Florida Construction Industry Licensing Board and explained his situation. That office mailed him forms which he filled out and mailed back in June of 1975. In March of 1976, some nine months later, the completed forms were mailed back to respondent, but no license was issued. On March 22, 1976, Mr. Clyde Pirtle, an investigator employed in the Jacksonville office of the Florida construction Industry Licensing Board, filled out and mailed to respondent a Notice of Violation," notifying respondent that he had failed to renew his certificate during June of 1975. The same "Notice of Violation" advised respondent of his putative failure to notify the Florida Construction Industry Licensing Board of his new address, although his application papers for the 1975-76 license had been returned to the new address. On the Monday after the Friday on which respondent received the "Notice of Violation," he telephoned Mr. Pirtle's office and was told that Mr. Pirtle would contact him. On or about June 3, 1976, Mr. Pirtle did contact respondent and meet with him. At this meeting, respondent showed Mr. Pirtle the papers he had mailed to the Board in June of 1975, and which were returned to him unprocessed in March of 1976. Mr. Pirtle told respondent that the papers had been returned because the application forms were for a registered, and not for a certified, contractor's license, and furnished respondent another set of forms. Respondent filled out the new set of forms and mailed them to the Board in June of 1976. A month and a half before the hearing in this cause, respondent received 1976-1977 certified general contractor's license No. CGC007702, which is currently in force. No contractor's license for 1975-76 was ever issued to respondent. On May 3, 1976, respondent applied for and was issued a building permit to erect a new residence at 1623 Anniston Avenue in the City of Holly Hill. At that time, respondent had no current contractor's license and presented to the authorities a license which had expired.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED that disciplinary action against Respondent, if any, be limited to a reprimand. DONE and ENTERED this 6th day of April, 1977, in Tallahassee, Florida. ROBERT T. BENTON Hearing Officer Division of Administrative Hearings Room 530 Carlton Building Tallahassee, Florida 32304 COPIES FURNISHED: Mr. Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Mr. Thomas L. West, Esquire Post Office Box 1857 1030 Volusia Avenue Daytona Beach, Florida 32015 J. K. Linnan, Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211

# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. PHILIP J. MAINS, 80-002231 (1980)
Division of Administrative Hearings, Florida Number: 80-002231 Latest Update: Jul. 08, 1981

Findings Of Fact In early September of 1979, John and Ruth E. Lockwood contracted with P & P Custom Pools, Inc. (P & P), for the construction of a swimming pool at their home, 231 El Dorado Drive, Debary, Florida. Respondent, Philip J. Mains, signed the contract on behalf of P & P and later obtained a building permit. He and his men began excavating on site in mid-September. The Lockwoods paid respondent $700.00 on September 6, 1979. As construction progressed, they paid him $1,706.25 on September 27, 1979; $1,000.00 on October 26, 1979; $1,047.50 on October 29, 1979; and $1,706.25 on November 20, 1979. At the appropriate times, a building inspector was summoned, who inspected the project, including the placement of reinforcing steel, ground wiring, and lights. Neither the "steel inspection" nor the "deck inspection" revealed any problem. The workmanship was excellent, as far as it went, but the Volusia County building inspector's office was never asked to perform a final inspection. As respondent promised there would be, there was water in the swimming pool by Christmas of 1979, but respondent did no further work after December, 1979. He never installed the pump, filter, diving board, or hand bars called for in the Lockwoods' contract. Earlier in 1979, Patrick T. Ryan, the other principal in P & P, left town and abandoned the business which was then $37,000 in debt. In November of 1979, respondent turned the company's books over to an accountant. In January of 1980 the business' financial problems became critical and, at the accountant's suggestion, respondent so advised the eight homeowners for whom he was building swimming pools, including, in January or February, Mr. Lockwood, who reacted angrily. Respondent testified that Mr. Lockwood "cussed him out." Thereafter respondent avoided the Lockwoods until April of 1980 when they found him working on another pool. There was enough money owed on the eight contracts as a group to finish all the pools, according to respondent's uncontroverted testimony, at the time the Internal Revenue Service levied on respondent's bank account and seized his tools and equipment. Even then respondent offered to finish the Lockwoods' pool if they would buy the materials. Respondent's wife asked Mrs. Lockwood to write a check to a supplier for a pump and filter so that respondent could install them and get water in the pool circulating. Instead, during the last week of April, 1980, the Lockwoods contracted with somebody else to finish the job and paid him $1,200. Respondent subcontracted with a Jacksonville cement company to pour concrete for the pool. After the concrete had been poured, the Lockwoods got a registered letter from the subcontractor threatening to place a lien on their property if he were not paid. According to Mr. Lockwood, the problem was that some check [supposedly drawn by respondent in favor of the subcontractor] had been delayed in the mail. In any event, there was no indication in the evidence that the Lockwoods heard anything further from the subcontractor.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That petitioner suspend respondent's registration for thirty (30) days. DONE AND ENTERED this 29th day of April, 1981, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of April, 1981. COPIES FURNISHED: Charles F. Tunnicliff, Esquire 130 North Monroe Street Tallahassee, Florida 32301 Philip J. Mains c/o Sue Mains Route 2, Box 799A DeLand, Florida 32720 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD DEPARTMENT OF PROFESSIONAL REGULATION, Petitioner, vs. CASE NO. 80-2231 PHILIP J. MAINS, RP 0024663, Respondent. /

Florida Laws (1) 489.129
# 3
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs RONALD J. POWELL, 00-002938PL (2000)
Division of Administrative Hearings, Florida Filed:Lakeland, Florida Jul. 18, 2000 Number: 00-002938PL Latest Update: Mar. 12, 2001

The Issue Did Respondent commit the violations alleged in the Administrative Complaint dated April 11, 2000, and if so, what discipline is appropriate?

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: The Department is the agency of the State of Florida charged with the responsibility of regulating the practice of contracting pursuant to Section 20.165, Florida Statutes, and Chapters 455 and 489, Florida Statutes. Respondent is, and has been at all times material hereto, a certified residential contractor in the State of Florida, having been issued license number CR CO13253 by the Florida Construction Industry Licensing Board. At all times material hereto, Respondent was licensed with the Construction Industry Licensing Board as an individual. On or about November 20, 1993, Respondent entered into a written contractual agreement (contract) with Kevin Watkins (Watkins) to construct a single family residence at 126 Meadow Lark Boulevard, Lot 65, Indian Lake Estates, Florida. The contract price was $333,944.00. Between December 7, 1993, and February 1, 1996, Watkins and Respondent executed 102 addenda to the contract which increased the contract price by approximately $241,874.43, for a total amount of approximately $575.818.43. On or about December 9, 1993, Respondent obtained permit number 93-120l850 from the Polk County Building Department and commenced work on the project. The contract provided that the "project shall be substantially completed on or about 195 days from the date all building permits are issued." However, due to the 100-plus addenda to the contract, it was estimated that an additional 190 days would be needed to complete the project. Additionally, construction ceased on the home for approximately 60 days so that Watkins could explore the possibility of a construction loan. However, due to the extent of completion, the lending institutions decided not to make any construction loans. On or about May 27, 1996, Watkins moved to Florida with the expectations that his home would be completed within a short period of time. (Watkins' recollection was that the home was to be completed in a couple of weeks. Respondent's recollection was that the home was to be completed in a couple of months.) In any event, Respondent did not complete the Watkins home within a couple of weeks or a couple of months. After Watkins moved to Florida, Respondent paid for Watkins to live in a Best Western motel for a few weeks. Subsequently, Respondent moved Watkins into a rental home for which Respondent paid the rent through September 1996. Beginning October 1996 through July 1999, Watkins paid $600.00 per month for a total of $20,400.00 as rent on the rental home. In early 1998, Respondent and Watkins went through the home, identified those items which had not been completed and Respondent made a handwritten list of those items. Respondent failed to complete the items identified on the list. In fact, shortly thereafter, Respondent ceased working on the project and was unresponsive to attempts to contact him. At the time Respondent ceased working on Watkins' home, the home was approximately 75 percent complete. While this estimation of completion may not be totally accurate, it is the best that could be derived based on the evidence presented, including Respondent's testimony to which I gave some credence. Watkins paid Respondent $561,617.91, which represents approximately 97.534 percent of the total contract price plus addenda to the contract. Seventy-five percent of the contract price plus addenda to the contract equals $431,863.82 for an overpayment of $129,754.09. To date, Respondent has not returned any of the money he received from Watkins above the amount completed under the contract. From early 1998, until August 1998, when Watkins had Respondent removed as general contractor on the building permit, Respondent failed to perform any work on the home for a period in excess of 90 days. Respondent contracted with Jack Eggleston to install cabinets in Watkins home. Eggleston performed under the contract but Respondent failed to pay Eggleston in full, requiring Watkins to pay Eggleston $1,200.00. After Watkins' home was partially complete, Respondent advised Watkins that he had the home insured when in fact he did not have the home covered with insurance. While Respondent was building Watkins' home, Respondent and Watkins entered into a joint venture called Contractors of Central Florida to build modular homes sometime after January 1, 1995. Respondent contends that some of the checks Watkins claims as payment under the contract for his home, were in fact reimbursement to Respondent for funds he had advanced for the joint venture. There is insufficient evidence to establish facts to show that any of the checks Watkins claims as payment under the contract for his home were in fact reimbursement for funds advanced by Respondent for the joint venture. Up until the time of the final hearing, the Department had incurred costs for the investigation and prosecution of this matter, excluding costs associated with an attorney's time, in the amount of $1,451.28.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, and after careful review of the guidelines set forth in Rule 61G4-17.001(8) and (11), Florida Administrative Code, and the circumstances for purpose of mitigation or aggravation of penalty set forth in Rule 61G4-17.002, Florida Administrative Code, it is recommended that the Department: Enter a final order finding Respondent guilty of violating Section 489.129(1)(h)2., Florida Statutes, and imposing a penalty therefor an administrative fine in the amount of $1,000.00; Enter a final order finding Respondent guilty of violating Section 489.129(1)(k), Florida Statutes, and imposing a penalty therefor an administrative fine in the amount of $1000.00; Assessing costs of investigation and prosecution, excluding costs associated with an attorney's time, in the amount of $1,451.28, plus any such further costs which have or may accrue through the taking of final agency action and; Requiring Respondent to pay restitution to Kevin Watkins in the amount of $129,754.09 which represents the amounts accepted by Respondent for work not performed. DONE AND ENTERED this 23rd of October, 2000, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6947 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 23rd day of October, 2000. COPIES FURNISHED: Robert A. Crabill, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32388-2202 Ronald J. Powell Post Office Box 7043 Indian Lake Estates, Florida 33855 Rodney Hurst, Executive Director Construction Industry Licensing Board 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Barbara D. Auger, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (4) 120.5720.165489.1195489.129 Florida Administrative Code (2) 61G4-17.00161G4-17.002
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE SOLER, 84-002529 (1984)
Division of Administrative Hearings, Florida Number: 84-002529 Latest Update: Feb. 06, 1986

Findings Of Fact At all times material to this proceeding Respondent was a registered building contractor in the State of Florida having been issued license number RB 0009164. At no time material to this proceeding was Domingo Alonzo (a/k/a Domingo Alonzo) registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. Respondent and Alonzo signed and submitted a proposal to Myron M. Gold and Roberta Fox for remodeling and additions to their residence located at 1550 Zuleta Avenue, Coral Gables, Florida in accordance with plans prepared by Frese - Camner Associates on file with the City of Coral Gables, Florida, File No. 2897 for a contract price of $65,940.00 with draw schedules attached. On December 6, 1982, Myron M. Gold and Roberta Fox (Homeowners) accepted the Proposal (Contract). On December 6, 1982, the Homeowners paid Respondent and Alonzo jointly $3,297.00 in accordance with the contract whereby they were to receive 5 percent of the contract amount as a down payment upon signing. The draw schedule provided for a 10 percent retainage from each draw which was to be paid to Respondent and Alonzo upon completion and the issuance of a certificate of occupancy. On December 21, 1982 the Homeowners paid Respondent and Alonzo jointly $2,025.00 which represented a draw on Schedule I - Item 3 for $1,350.00, Schedule II - Item 2 for $360.00 and Item 5 for $315.00. On December 17, 1982 the Homeowners and Respondent filed the affidavit required by ordinance with the City of Coral Gables for the purpose of having a building permit issued covering the work under the contract. 9. On January 19, 1983 Respondent using his building contractors license applied for building permit to cover the work anticipated under the contract and on the same day was issued building permit, No. 28214. Under the contract the Homeowners were to pay for the building permit and the bond required by the city. On January 26, 1983 the Homeowners paid Respondent and Alonzo jointly $3,000.00 which along with a payment on January 27, 1983 of $500.00 and January 31, 1983 of $544.60 represented a draw on Schedule I - Item 2 for $405.00, Item 5 for $1,260.00, Item 6 for $1,547.10 and Item 13 for $832.50. All payments from December 6, 1982 through January 31, 1983 under the contract by the Homeowners totaled $9,366.50 and were paid jointly to Respondent and Alonzo. On February 4, 1983 Respondent and Alonzo entered into an agreement, prepared by Myron Gold in the law office of Gold and Fox, whereby the Homeowners were to pay the balance of the funds remaining under the contract to Alonzo individually. After this date all payments were made to Alonzo. It was the Homeowners understanding after the February 3, 1983 agreement that Respondent would still be responsible for the supervision of the construction although they never saw Respondent again until October 1983. Edward Borysiewicz testified that he dealt with Respondent during March 1983 when he made the floor slab inspection on March 3, 1983 and the columns inspection on March 14, 1983. The record is clear that shortly after the agreement on February 3, 1983 Respondent no longer came to the construction site and supervised the work of Alonzo. On February 8, 1983 the Homeowners paid Alonzo $3,060.00 which represented a draw on Schedule I - Item 1 for $810.00, Item 5 for $1,417.50 and Item 13 for $832.50. On February 28, 1983 the Homeowners paid Alonzo $3,155.40 which represented a draw on Schedule I - Item 4 for $1,705.50 and $729.90 for extras apparently not covered by the contract but whether the balance of check No. 1161 (Pet. Ex. 13) of $720.00 was for payment under the contract or for extras is not shown in Petitioner's Exhibit No. 15. On March 18, 1983 the Homeowners paid Alonzo $1,000 which represented a draw on Schedule I - Item 9 for $819.00. Again whether the balance of check No. 1206 (Petitioner's Exhibit No. 13) of $181.00 is for payment under the contract or for extras is not shown in Petitioner's Exhibit No. 15. On March 21, 1983, the Homeowners paid Alonzo $6,400.00 which represented a draw on Schedule I - Items 10, 11, 12, 14 and 15. On March 21, 1983 the Homeowners paid Alonzo $2,166.90 but Petitioner's Exhibit No. 15 does not list check No. 1210 as being a payment under the contract or for extras. On March 31, 1983 the Homeowners paid Alonzo $4,230.00 which represents a draw under Schedule I - Item 7 for $2,520.00 and a payment for extras not covered under the contract in the amount of $1,710.00. On April 21, 1983 the Homeowners paid Alonzo $5,207.40 which represented a draw Schedule I - Items 1, 5, 6, 9 and 14. On June 24, 1983 the Homeowners paid Alonzo $5,788.00 which represented a draw on Schedule I - Item 12 for $667.00, Item 14 for $3,024.00 and payment for extras not under contract for $2,097.00. After March 14, 1983 Respondent was not seen on the job site and there was no longer any apparent supervision of Alonzo by Respondent. After Respondent left the job site there was no licensed building contractor involved in the construction. After Respondent left the construction site the Homeowners soon realized that Alonzo did not know how to proceed with the work and experienced problems with the pace and manner in which the work was being accomplished. On July, 1983, Alonzo stopped working altogether. Although the Homeowners were aware of the problems that Alonzo was having with the construction and that Respondent was not on the job, the record does not reflect that they ever attempted to contact Respondent after the meeting on February 3, 1983. On August 1, 1983 the Homeowners notified Respondent and Alonzo that the contract had been terminated. The Homeowners paid Respondent and Alonzo $42,174.20 total under the contract (pages 1-5, Petitioner's Exhibit No. 15) and paid Alonzo $10,766.37 for extras (Pages 6- 10, Petitioner's Exhibit No. 15). On August 31, 1983 the Homeowners paid Edward Bryant, plastering contractor the sum of $3,100.00 for plastering performed by Edward Bryant. This was for work under the contract that had not been completed or work necessary to correct problems that were already completed. Roberta Fox testified that there were no extras on plaster, however, page 7, line 11 and page 9, line 21 of Petitioner's Exhibit 15 indicates that there was extra plastering. On August 29, 1983 and September 29, 1983 the Homeowners paid Southwest Plumbing Services, Inc. the total amount of $4,875.00 for work contemplated under the contract that had not been completed or needed correction. Homeowners had paid Alonzo $3,591.00 for plumbing under the contract. Both Alonzo and Southwest Plumbing, Inc. were paid for extra plumbing not covered by the contract in the amount of $567.00 and $391.50, respectively by the Homeowners. From September 13, 1983 through June 13, 1984 the Homeowners paid Charles Brueg, Jim Brueg, Charles Buffington and Dan, Inc. the total amount of $4,192.91 for electrical work contemplated under the contract that was not completed or required correction after Alonzo left the construction site. Page 6 lines 6 and 11 of Petitioner's Exhibit No. 15 indicate that there were extras not covered by the contract. The total amount for electricity contemplated by the contract was $3,649.00. Alonzo was paid $2,627.10 under the contract and $1,710.00 for extras. The Homeowners were required to obtain the services of an air conditioning contractor to complete the work contemplated under the contract after Alonzo left the job site and as a result were required to pay Cameron, Inc., the air conditioning contract the amount of $5,181.60 between August 16, 1983 and January 24, 1984. The total amount contemplated under the contract was $3,600.00 of which $1,134.00 had been paid to Alonzo. Debris was dumped in the swimming pool requiring the Homeowners to pay $7,000 to refurbish the swimming pool. This amount included the repair contemplated under the contract and the extra work caused by Alonzo. The contract contemplated $2,300.00 for repairs of which none had been paid to Respondent or Alonzo. The Homeowners paid $1,150.00 to a painting contractor to finish the painting contemplated under the contract. Alonzo had been paid $1,125.00 for painting. (Petitioner's Exhibit No. 15) The contract provided $2,500.00 for all painting required under the contract. Respondent failed to notify the building department that he was no longer responsible for the construction. After the Homeowners terminated the contract due to Respondent's and Alonzo's nonperformance, the Homeowners had to expend a substantial amount of extra money to complete the construction. The evidence is insufficient to determine an exact or approximate amount. Roberta Fox's testimony was conflicting with regard to her understanding as to whether or not the Respondent would continue to supervise the construction after the meeting in the Homeowners' law office on February 3, 1983 when Respondent and Alonzo entered into this agreement. Myron Gold testified that it was his understanding that Respondent would continue to supervise Alonzo after the agreement. However, the Homeowners action in this regard subsequent to February 3, 1983, in making no effort to bring the matter to a "head" and requiring Respondent to supervise the work or terminate the contract and in continuing to deal with Alonzo although Homeowners were aware shortly after February 3, 1983 that Alonzo could not perform without Respondent's supervision and that they knew Respondent was not on the job, tends to show that they were aware or should have been aware that Respondent was no longer involved in the day to day supervision of the construction. Alonzo installed a fireplace pursuant to the contract that the building department determined to be a fire hazard and recommended against its use. The Homeowners applied for and were granted a "owner/builder" permit on September 1, 1983 and requested cancellation of the building permit issued to Respondent which was cancelled on September 6, 1983. They have not received a certificate of occupancy because the building department has not performed the following inspection: electrical final; plumbing final; air conditioning final; roofing final and public works final. The building department would have issued a "stop-work order" had it been aware that Respondent was not supervising the construction and would have required the Homeowners to obtain another licensed building contractor or proceed as a owner/builder. The plans prepared by Frese-Camner Associates that were made a part of the contract by reference were not introduced into evidence with the contract and thus the record is insufficient to determine what was required to meet the specifications of the plans and thereby determine if the specifications had been met. There was a permit issued for the septic tank and drain field which work was started in December, 1982. The construction of the house itself was started in January 1983. The first inspection (foundation) on the house was made by the building department of January 21, 1983.

Recommendation Based on the findings of fact and conclusions of law recited herein, it is Recommended that the Board enter a final order finding Respondent guilty of violating Section 489.129(1)(h)(k)(m), Florida Statutes (1981) and for such violations it is Recommended that the Board assess the Respondent with an administrative fine of $500.00 and suspend the Respondent's contracting license for a period of three (3) years, provided, however, that if Respondent submits to the Board competent and substantial evidence of restitution to Myron Gold and Roberta Fox within one (1) year from the date of the final order herein, then the suspension shall be stayed and Respondent placed on probation for the balance of the suspension. Respectfully submitted and entered this 6th day of February, 1986, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of February, 1986. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 84-2529 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties to this case. RULINGS ON PROPOSED FINDINGS OF FACT SUBMITTED BY THE PETITIONER: Adopted in Finding of Fact 1. Adopted in Finding of Fact 2. Adopted in Finding of Fact 3 but clarified. Adopted in Findings of Fact 4 and 5. Adopted in Finding of Fact 4. Adopted in Finding of Fact 6. Adopted in Finding of Fact 5. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 10. Adopted in Finding of Fact 11. Adopted in Finding of Fact 12 except clarified as to the last date on construction site. Adopted in Finding of Fact 13. Adopted in Finding of Fact 14 but clarified. Adopted in Finding of Fact 15 but clarified. Adopted in Finding of Fact 16. Adopted in Finding of Fact 17 but clarified. Adopted in Finding of Fact 15 but clarified. Adopted in Finding of Fact 19. Adopted in Finding of Fact 20 but clarified. Adopted in Finding of Fact 21. Adopted in Finding of Fact 11. Adopted in Finding of Fact 21. Adopted in Finding of Fact 22. Adopted in Findings of Fact 22 and 23. Adopted in Finding of Fact24 but clarified to show correct amount paid under contract as indicated by Petitioner's Exhibit 15. Adopted in Finding of Fact 25 but clarified to show that extra plastering not under contract was required. Adopted in Finding of Fact 26. Adopted in Finding of Fact 26. Adopted in Finding of Fact 26. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 29 but clarified. Adopted in Finding of Fact 30 but clarified. Rejected as immaterial. Rejected as not supported by competent substantial evidence. Rejected as not supported by substantial competent evidence. Adopted in Finding of Fact 31. Rejected as immaterial. Adopted in Finding of Fact 32 but clarified to show that the record does not support a figure that approximate $32,000.00. Rejected as not supported by substantial competent evidence even though the Homeowners' testimony supported this fact because the Homeowners' actions with regard to Respondent after February 3, 1983, was to the contrary. Adopted in Finding of Fact 33. Adopted in Finding of Fact 34. Adopted in Finding of Fact 34. Adopted in Finding of Fact 34. Adopted in Finding of Fact 35. Adopted in Finding of Fact 36. Adopted in Finding of Fact 36. RULINGS ON PROPOSED FINDINGS OF FACT SUBMITTED BY RESPONDENT: No Findings of Fact was submitted by the Respondent. COPIES FURNISHED: James Linnan, Executive Director Department of Professional Regulation Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino, General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 W. Douglas Beason Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. George J. Soler, Pro Se 3315 S.W. 96th Avenue Miami, Florida 33165

Florida Laws (6) 120.57155.40489.105489.113489.127489.129
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GARY A. SMITH, 78-001780 (1978)
Division of Administrative Hearings, Florida Number: 78-001780 Latest Update: Feb. 13, 1979

Findings Of Fact Gary Smith d/b/a Sirmons Roofing Company is a roofing contractor registered with the Florida Construction Industry Licensing Board. Smith does not hold any license issued by local construction licensing boards which does not license roofing contractors. Smith admitted that he had commenced construction projects without acquiring the appropriate building permits from the local building officials. Calvin Smith identified a contract, Exhibit 2, which he had entered into with Gary Smith d/b/a Sirmons Roofing regarding the repair of the roof of his house. This contract called for the replacement of bad wood, which was understood by the parties to refer to rotten wood planking and rafters. Calvin Smith stated that after construction commenced and the old roof had been removed, his house had suffered rain damage although Gary Smith had advised him that the roof had been dried in. Gary Smith explained that he had in fact laid the requisite felt paper on the roof but that a severe wind and rain storm and occurred immediately following which had destroyed the felt paper. Smith stated that a crew was on the job during the storm at all times trying to keep the felt nailed down and maintain the water-tight integrity of the roof. There were no delays following the removal of the roof in replacing the felt and diligently proceeding with the re-roofing. Several days after the storm the roof had been finished, the plywood ceiling of the family room of Calvin Smith's house was partially removed to permit the insulation to be replaced. At this time Calvin Smith discovered rotten wood which Smith felt should have been removed and replaced by Gary Smith pursuant to their contract. Gary Smith stated that he had found one rotten rafter, but that he had advised Calvin Smith of the fact that it was there and that Calvin Smith realized that he was not replacing it. Gary Smith stated that he had removed and replaced all the rotten wood in the roof and that the rotten wood discovered by Calvin Smith was on that portion of the family room roof which was under the eaves of the pre-existing roof of the house where it could only be seen upon removal of the family room ceiling. Gary Smith further testified that subsequent to finding the rotten wood, Calvin Smith had not permitted him to correct the job and that he had not personally seen the rotten wood, pictures of which Calvin Smith had identified. Calvin Smith identified photographs of the interior and exterior of the roof as repaired by Gary Smith. These photographs were received as Exhibits 3 and 8. Exhibits 7 and 8 were photographs of the exterior of the roof. Exhibit 8 is a photograph of a shingle which was not properly installed. Gary Smith admitted that the shingle was not properly installed but stated that it would have been corrected prior to finishing the job. Exhibit 7 is a photograph showing a course of shingles which does not have the proper overlap. Gary Smith explained that this short run of shingles was necessary to even up or balance the runs on both sides of a hip in the roof because the distance from the eave to the top or peak of the hip was not the same on both sides. Gary Smith also pointed out that in both photographs the shingles are laid so that the bottom of the upper course of shingles comes to or overlaps the lower course of shingles to the top of the tab, causing good contact between the shingles and the adhesive strips. Contrary to the assertion of Calvin Smith that the shingles had been laid in such a manner that the adhesive strips did not touch. Calvin Smith had identified Exhibit 6 as photograph of roof flashing on the family room roof which he asserted was improperly installed. Gary Smith stated that the flashing in Exhibit 6 was installed in accordance with the manufacturer's recommendation and that the roof on the family room had the requisite number of layers of felt and tar as required by the building code. Gary Smith stated that he could not identify the purported location of the underside of the roof depicted in Exhibit 5 and identified by Calvin Smith as being in the middle of the family room. Gary Smith stated that he could not identify the purported location of the underside of roof depicted in Exhibit 5 and identified by Calvin Smith as being in the middle of the family room. Gary Smith stated that he had shown the rotten beam indicated in Exhibit 4 to Calvin Smith and that Calvin Smith had known that he was not replacing the bean because replacement would have required the removal of the family room ceiling as well as the sheeting on the roof over the beam. Gary Smith stated that the wood shown in Exhibit 3 was not rotten but water stained and that the beam was sufficiently solid to hold the weight of the roofing materials on top of it and to nail the new sheeting into. Tommy Thompson, construction inspection supervisor of the City of Jacksonville, inspected the roof of Calvin Smith's home. Thompson found that the shingles had not been lapped properly, that some shingles had been laid so that the ceiling strips would not adhere properly, that rotten rafters and wood had been left, that the correct number of nails had not been placed in the shingles, that metal flashing around the chimney had not been installed in accordance with the manufacturer's specifications, and that one, twelve inch hold had been left in the roof sheeting. Thompson identified the Building Code of the City of Jacksonville and those portions of the code relating to installation of roofing materials. Thompson stated that the items mentioned in the paragraph above constituted violations of the code. Thompson also pointed out that it was a violation of the code to commence construction or repair of a roof without obtaining the requisite building permit. J. R. Bond, Executive Director of the Construction Trades Qualifying Board of the City of Jacksonville, stated that the board did not certify roofers. The ordinances of the City of Jacksonville empower the Construction Trades Qualifying Board to hear complaints against state registered but unlicensed contractors. However, the board lacks authority to take direct action against persons who are state registered but unlicensed. The board may only request that the city building official not issue the individual any further building permits. The building official must exercise his own independent authority and judgment in determining whether to suspend an individual's right to obtain building permits. The building official suspended Smith's privilege to obtain permits without a hearing.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, the Hearing Officer recommends that Smith's registration as a roofing contractor be suspended for a period of one year. DONE and ORDERED this 3rd day of January, 1979, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings 530 Carlton Building Tallahassee, Florida 32304 Telephone: 904/488-9675 COPIES FURNISHED: Michael Egan, Esquire 217 South Adams Street Tallahassee, Florida 32304 Gary A. Smith Sirmons Roofing Company 3845 Edidin Drive Jacksonville, Florida 32211 J. K. Linnan, Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. CASE NO.: 78-1780 GARY A. SMITH d/b/a SIMMONS ROOFING CO., RC 0030047, 3845 Edidin Drive, Jacksonville, Florida 32211, Respondent. /

# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. K. C. MOORE, 77-000496 (1977)
Division of Administrative Hearings, Florida Number: 77-000496 Latest Update: Sep. 08, 1977

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, the Hearing Officer would recommend that no action be taken against the licenses of K. C. Moore as a registered builder contractor. In addition, the testimony at the hearing revealed that subsequent to the institution of this complaint that Dr. 0. Rao, M.D., did make application to the Florida Construction Industry Licensing Board for licensure as a contractor, that his application was approved, and that upon successful completion of the Board's examination he was licensed. If K. C. Moore is in fact guilty of aiding or abetting or knowingly combining or conspiring with a person to violate Part II, Chapter 468, the person with whom he combined or conspired or who he aided or abetted was Dr. John 0. Rao. Although the Board may be limited under the statutory provisions in denying Dr. Rao the license, assuming the Board rejects the Hearing Officer's Conclusions of Law and finds the facts constitute a violation of the statutory provisions, there is an absence of essential fairness to proceed against the licenses of K. C. Moore while licensing the individual with whom he contracted. The disparity in treatment of K. C. Moore and Dr. John 0. Rao is a factor which must be considered by the Board. DONE and ORDERED this 20th day of July, 1977, in Tallahassee, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 R. Stephen Miles, Jr., Esquire Mile and Cumbie Post Office Box 517 Kissimmee, Florida 32741 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner,

# 7
WILLIAM AND MARLENE GRUBB vs DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD AND NORMAN LEVINSKY, 04-003047 (2004)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Aug. 30, 2004 Number: 04-003047 Latest Update: Nov. 07, 2019

The Issue Whether Petitioners' claim for monies from the Florida Homeowners' Construction Recovery Fund is subject to adjudication pursuant to Section 120.57(1), Florida Statutes, and, if so, how much should Petitioners be awarded.

Findings Of Fact Based on the evidence adduced at hearing, and the record as a whole, the following findings of fact are made: On or about October 1, 1997, Petitioners entered into a contract in which they agreed to pay Respondent Norman Levinsky's company, Broward Roofing, Inc., $3,700.00 to place a "new shingle roof" on Petitioners' residence and perform other related roofing work. The contract provided Petitioners with a ten-year "labor warranty" and a 30-year shingle warranty. After the contracted work was completed and Petitioners paid Broward Roofing, Inc., the $3,700.00 called for by the contract, the newly-installed roof started leaking. Broward Roofing, Inc., refused to make the necessary repairs. Petitioners paid other contractors to perform the repair work. On November 17, 1998, Petitioner filed an application seeking to recover from the Florida Construction Industries Recovery Fund (which has since been renamed the Florida Homeowners' Construction Recovery Fund) $1,025.00 that they had paid for repairs to the "new shingle roof" Broward Roofing, Inc., had recently installed, contending that they were deserving of such an award inasmuch as "[t]he roofer [Broward Roofing, Inc.] [had] refused to fix [their] new roof that was leaking and [had] totally ignored [their] 10 year warranty." Their application was filed on a Board-produced Construction Industries Recovery Fund Claim Form (Form), at the end of which was printed the following: In addition to your complete written statement, we are requesting documentation of your contractual relationship with the contractor and evidence supporting your claim. Certified copies of the following list of documents are required to assist us in determining your eligibility for recovery. I have attached the following: (these documents are required for proper processing of your claim. Failure to provide required documentation will delay processing and could result in your claim being denied due to incompleteness.) Court certified copy of the Civil Judgment, and/or Final Order of the Construction Industry Licensing Board directing restitution be paid. Copy of contract between you and the contractor. Copies of applicable bonds, sureties, guarantees, warranties, letters of credit and/or policies of insurance. Court certified copies of levy and execution documents. Proof of all efforts/inability to collect restitution judgment. No claims will be processed until 45 days after the date of entry of the Civil Judgment and/or Final Restitution Order. On the completed Form that Petitioners filed, only the spaces next to "Copy of contract between you and the contractor" and "Copies of applicable bonds, sureties, guarantees, warranties, letters of credit and/or policies of insurance" were checked. On May 4, 1999, the Broward County Central Examining Board of Construction Trades filed an Administrative Complaint against "Norman Levinsky d/b/a Broward Roofing, Inc.," which read as follows: Count I At all times material hereto RESPONDENT was a roofing contractor holding Broward County Certificate of Competency #95-7726-R- R. On or about September 16, 1997, RESPONDENT entered into a contract to re- roof Complainant's home located at 10551 N.W. 21st Court, Sunrise, Florida. RESPONDENT obtained a building permit. The work was completed on March 10, 1998 and the roof began to leak on June 1, 1998. RESPONDENT failed to properly supervise to ensure that the tie in with flat roof was properly completed. His failure to ensure such a proper tie in resulted in leaks. Wherefore, it is charged that the RESPONDENT violated Subsection 9-14(b)(11) of the Broward County Code of Ordinances by failing to properly supervise a project commenced pursuant to a building permit. Count II Paragraphs 1 and 2 are included as if restated herein. Complainant paid RESPONDENT the total contract price of $3,700.00. RESPONDENT completed the work. RESPONDENT gave Complainant a 10 year labor warranty. RESPONDENT failed and refused to honor his warranty. Complainant had to pay additional amount of $1,025.00 for a new contractor to repair the work of RESPONDENT. Wherefore, it is charged that the RESPONDENT violated Subsection 9-14(b)(5)c of the Broward County Code of Ordinances by committing mismanagement which causes financial harm to a customer because the customer had to pay more for the contracted job than the original contract price. Count III Above paragraphs are included as if restated herein. RESPONDENT failed to honor the warranty and complete the project in a workmanlike manner for a period in excess of 90 consecutive days. Wherefore, it is charged that the RESPONDENT violated Subsection 9-14(b)(8) of the Broward County Code of Ordinances by abandoning a construction project in which RESPONDENT was under contract as a contractor. It is determined that the above stated charges are grounds for disciplinary action pursuant to Chapter 9, Sections 9-14, 9-28 and 9-46, Broward County Code of Ordinances and Section 6.11, Broward County Charter. Broward County has the authority to certify and discipline local contractors pursuant to Section 489.131, Florida Statutes. Following a hearing on the Administrative Complaint held May 25, 1999, the Broward County Central Examining Board of Building Construction Trades, on June 16, 1999, issued an Order, which read as follows: A Disciplinary Proceeding was held on May 25, 1999, before the Broward County Central Examining Board of Building Construction Trades (the "Board"), in accordance with Section 9-14, Broward County Code of Ordinances (the "Code"). Service of the Administrative Complaint filed against the Respondent was made by certified mail. The Respondent being duly advised was not present at the hearing. The Board heard the sworn testimony of William Grubb and Marlene Grubb. Upon consideration, it is ORDERED: The allegations of fact as set forth in the Administrative Complaint are found to be true and adopted and incorporated herein by reference as findings of fact. The conclusions of law alleged and set forth in the Administrative Complaint are approved and adopted and incorporated herein. Upon these findings, it is therefore ORDERED: That Respondent's Certificate of Competency is hereby revoked. That the Respondent make restitution to the Complainants in the amount of $3,700.00. Prior to the RESPONDENT being allowed to reinstate his certificate of competency or being allowed to sit for any exam administered by a Broward County Central Examining Board, or receiving any license from a Broward County Central Examining Board, RESPONDENT must appear before the Board and prove that the restitution amount has been paid in full. The board's order may be appealed by Petition for Writ of Certiorari to the Seventeenth Judicial Circuit within thirty (30) days of the date of rendition of the order of the board as provided by the Florida Rules of Appellate Procedure. FURTHER, the Broward County Central Examining Board of Construction Trades makes RECOMMENDATION to the Florida Construction Industry Licensing Board to impose on the state registration, the following penalty: 1. Revoke state registration and require the RESPONDENT to make restitution to the Complainants in the amount of $3,700.00. In accordance with Florida Statutes, Chapter 489.131(7)(c) and (d), the disciplined contractor, the complainant, or the Department of Business and Professional Regulation may challenge the local jurisdiction enforcement body's recommended penalty for Board action to the State Construction Industry Licensing Board. A challenge shall be filed within sixty (60) days of the issuance of the recommended penalty to the State Construction Industry Licensing Board in Jacksonville, Florida. If challenged, there is a presumptive finding of probable cause and the case may proceed before the State Board without the need for a probable cause hearing. Failure of the disciplined contractor, the complainant, or the Department of Business and Professional Regulation to challenge the local jurisdiction's recommended penalty within the time period set forth in this subsection shall constitute a waiver of the right to a hearing before the State Construction Industry Licensing Board. A waiver of the right to a hearing before the State Board shall be deemed an admission of the violation, and the penalty recommended shall become a final order according to procedures developed by State Board rule without further State Board action. Pursuant to Section 120.569, Florida Statutes, the Parties are hereby notified that they may appeal the Final Order of the State Board by filing one copy of a Notice of Appeal with the Clerk of the Department of Business and Professional Regulation, Northwood Centre, 1940 North Monroe Street, Tallahassee, Florida 32399-0792, and by filing the filing fee and one copy of the Notice of Appeal with the District Court of Appeal within thirty (30) days of the effective date of said Order. On or sometime after September 1, 1999, Petitioners filed an affidavit prepared by Petitioner Marlene Grubb, which read as follows: I, Marlene A. Grubb, hereby certify that I have completed a reasonable search and inquiry in accordance with the instructions provided by the Construction Industry Licensing Board and have not found property or assets to satisfy my Board Order[1] in whole or part. Legal Names The Department of State revealed that the company Broward Roofing Inc. was administratively dissolved on 9/10/98. The C[IL]B verified the contractor[']s name and license number as: Norman Levinsky d/b/a Broward Roofing Inc. RC0047656. Real Property My search included property in the names: Norman Levinsky and Broward Roofing Inc. in Broward County, Florida. Norman Levinsky had no real property and Broward Roofing Inc. is delinquent on property taxes for over two years. Boats and Motor Vehicles There were no vehicles or boats in the motor vehicle data bank registered to Norman Levinsky or Broward Roofing Inc. Aircraft The FAA in Oklahoma City, Ms. Jeannie Vannest stated that there is no registration listed for Norman Levinsky or Broward Roofing Inc. On March 25, 2004, the Board rendered a Final Order Approving Recommended Order of Disciplinary Action by Local Enforcement Body, which approved the Broward County Central Examining Board of Building Construction Trades' June 16, 1999, Order and read as follows: THIS MATTER came before the Construction Industry Licensing Board (hereinafter referred to as the "Board") pursuant to Section 489.131(7), Florida Statutes, for a determination of whether to accept the proposed recommended penalty by the Broward County Central Examining Board of Building Construction Trades (a copy of which is attached and incorporated herein by reference). Neither the Petitioner, the Respondent nor the Complainant filed a challenge to the local enforcement body's recommended penalty to the Board. Upon consideration of the local enforcement body's Administrative Complaint, the minutes from the meetings on January 21, 1999, and May 25, 1999, and the Final Order of Disciplinary Action and its proposed recommended penalty to the Board in this matter and being otherwise fully advised in the premises it is hereby ORDERED AND ADJUDGED: The proposed recommended penalty is hereby approved and adopted in its entirety and incorporated herein by reference. In accordance with the recommended penalty, Respondent's state registration (RC 0047656) is hereby REVOKED. Respondent shall pay restitution in the amount of $3,700 to William and Marlene Grubb. Respondent will adhere to and abide by all of the terms and conditions of the recommended penalty. Failure to abide by the terms of this Order may result in further action by the Board. This Order shall be placed in and become a part of Respondent's official records. A change in the Respondent's licensure status, including the suspension, revocation, voluntary relinquishment, or delinquency of license, does not relieve the Respondent of his obligation to pay any fines, costs, interest or restitution imposed in this and previous orders. Pursuant to Section 120.68, Florida Statutes, the Parties are hereby notified that they may appeal this Final Order by filing a Notice of Appeal with the Clerk of the Department of Business and Professional Regulation, Northwood Centre, 1940 North Monroe Street, Tallahassee, Florida 32399- 0792, and by filing the filing fee and one copy of the Notice of Appeal with the District Court of Appeal within thirty (30) days of the effective date of this Order. This Order shall become effective upon filing with the Clerk of Department of Business and Professional Regulation. This was the "Final Order of the Construction Industry Licensing Board directing restitution be paid," that, according to the Form Petitioners used to submit their claim for monies from the Florida Construction Industries Recovery Fund, was "required for proper processing of [their] claim." On June 10, 2004, more than five and a half years after Petitioners had filed their claim application, the Board met to determine the merits of their claim pursuant to Section 120.57(2), Florida Statutes. Although given due notice of the Board meeting, neither Petitioners, nor Mr. Levinsky, made an appearance, either in person or through a representative, at the meeting. "[U]pon consideration of the documentation and testimony submitted," the Board determined that Petitioners' claim for $1,025.00 should be "approved." On July 29, 2004, the Board rendered (that is, filed with the agency clerk) a written order to this effect, which read as follows: THIS MATTER came before the Construction Industries Recovery Fund Committee and Construction Industry Licensing Board (the "Board") pursuant to sections 120.57(2) and 489.143, Florida Statutes (2003) as well as rule 61G4-21.004, Florida Administrative Code, on June 10, 2004, in Coral Gables, Florida, for consideration of a claim for restitution from the Construction Industries Recovery Fund (the "Recovery Fund"). William [a]nd Marlene Grubb ("Claimants") and Norman Levinsky ("Licensee") were duly notified of the proceedings. At the proceedings before the committee and the Board, Claimants were not present, and were not represented by counsel. Licensee was not present, and was not represented by counsel. Upon consideration of the documentation and testimony submitted, it is ORDERED: Claimants satisfied all requirements for payment from the Recovery Fund. The Recovery Fund Claim was filed on November 17, 1998. The application was timely filed. The contractor was paid $3,700.00. Claimants were awarded restitution from the Construction Industry Licensing Board on March 24, 2004, in the amount of $3,700.00, pursuant to a Final Order Approving Recommended Order of Disciplinary Action by Local Enforcement Body. The Board adopted and approved the Broward County Central Examining Board of Building Construction Trades recommendation, which found: Contractor held a current and active license at all times material to the transaction; The construction contract is dated September 18, 1997; The work was completed on March 10, 1998, and the roof began leaking June 1, 1998; Contractor failed to honor the warranty on the roof; As a result, Claimants paid an additional $1,025.00 for repair work; Contractor violated subsection 9- 14(b)(5)c of the Broward County Ordinances by committing mismanagement, which caused financial harm to a consumer because the consumer had to pay more for the contractual job than the original contract price. The contractor engaged in activity that appears [to] violate section 489.129(1)(g)2, Florida Statutes (2003). There is an asset search in the file that shows no assets are available from which claimant can satisfy the judgment. Pursuant to section 489.143, Florida Statutes (2003), the maximum amount that the Recovery Fund can pay on a single claim is $25,000.00. Thus, the claim for restitution from the Recovery Fund is APPROVED in the amount of $1,025.00. In accordance with rule 61G4-21.005, Florida Administrative Code, the Secretary of the Florida Department of Business and Professional Regulation is directed to pay the claim from the Recovery Fund after forty-five days from the date upon which the Final Order is filed with the Agency Clerk. Pursuant to section 489.143(6), Florida Statutes (2003), upon payment of the claim from the Recovery Fund, Licensee's licensure to practice contracting is AUTOMATICALLY SUSPENDED without any further administrative action. Pursuant to section 489.143(2), Florida Statutes (2003), upon receipt by Claimant under section 489.143(1), Florida Statutes (2003) of payment from the Recovery Fund, Claimant shall assign his or her additional right, title, and interest in the judgment or restitution order, to the extent of such payment, to the Board, and thereupon the Board shall be subrogated to the right, title, and interest of the Claimant; and any amount subsequently recovered on the award, judgment or restitution order by the Board, to the extent of the right, title, and interest of the Board therein, shall be for the purpose of reimbursing the Recovery Fund. This Order shall become effective upon filing with the Clerk of the Department of Business and Professional Regulation. DONE AND ORDERED this 21st day of June, 2004. Appended to the order was the following Notice of Right of Appeal: You are hereby notified that mediation is not available in this matter. Pursuant to Section 120.569, Florida Statutes, you may seek review of the above by filing a request for hearing with the Executive Director of the Board at 1940 North Monroe Street, Tallahassee, Florida 32399-2202 within twenty-one (21) days of the filing of this Order. Upon request, you will receive an informal hearing pursuant to section 120.57(2), Florida Statutes. In the alternative, you may request a formal hearing pursuant to Section 120.57(1), Florida Statutes, if there are material facts in dispute; if you request a formal hearing, the petition must contain the information required by Rule 28-106.201, Florida Administrative Code, including specification of the facts which are in dispute. If you request a hearing, you have the right to be represented by an attorney or other qualified representative to take testimony. On August 12, 2004, Petitioners filed a Request for Hearing, complaining that they "should be awarded at least $3,475.00" to be adequately compensated for all of the repairs they had to make to their roof as a result of Broward Roofing, Inc.'s failure to meet its responsibilities. On August 30, 2004, the Board referred the matter to DOAH "for the assignment of an Administrative Law Judge to conduct a formal hearing" pursuant to Section 120.57(1), Florida Statutes.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Board issue an order dismissing Petitioners' Request for Hearing challenging the Board's order, rendered July 29, 2004, disposing of their claim for monies from the Fund, but allowing them, if they so desire, to request that that order be vacated and re-rendered so that they will have the opportunity to file a timely appeal in accordance with Section 120.68, Florida Statutes. DONE AND ENTERED this 28th day of December, 2004, in Tallahassee, Leon County, Florida. S __ STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of December, 2004.

Florida Laws (14) 120.569120.57120.68409.141455.275489.105489.129489.131489.140489.1401489.141489.142489.143713.35
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JAMES RASKIN, 77-000624 (1977)
Division of Administrative Hearings, Florida Number: 77-000624 Latest Update: Aug. 10, 1977

Findings Of Fact The parties stipulated to the fact that James Baskin holds registered contractor's license number BC 0011300. Raskin's registered general contractor's license was issued by the Florida Construction Industry Licensing Board. Prior to the commencement of the hearing, the Hearing Officer held that the record of the proceedings for the Cape Coral Board could be filed as a late filed exhibit in this cause in order that the Florida Construction Industry Licensing Board could review the Cape Coral Board's action pursuant to its authority under Section 468.112(2)(f), Florida Statutes. Ambassador Homes contracted with Sam and Marie Franzella for the construction of a single family residence to be constructed on the property located on Lots 41-42, Block 1224, Cape Coral Unit 19, Section 32-33, Township 44 South, Range 24 East. Stucky Well Drilling was initially contacted by an unknown agent of Ambassador Homes on January 1, 1975, and directed to drill a well, and install a deep well jet pump and tank at the location stated above. On January 20, 1975, Marion, a secretary for Ambassador Homes, called Stucky Well Drilling and directed that Stucky Well Drilling install the well and equipment as soon as possible. On January 21, 1975, a 210 foot well was drilled on the property described above and on January 23, 1975, a Mr. Green from Ambassador Homes called and requested that the tank and equipment be installed immediately. Mr. Hall, an employee of Stucky Well Drilling, installed all the equipment as ordered on January 23, 1975. On January 24, 1975, a bill in the amount of Six Fifty Dollars ($650.00) was sent to Ambassador Homes for the work performed on the property described above. Ambassador Homes was a corporation engaging in residential contracting and operating under the license of James Raskin. Ambassador Homes did not pay Stucky Well Drilling the bill for the drilling of the well and installation of the equipment on the property described in paragraph 3 above. Subsequently Stucky Well Drilling brought suit against Ambassador Homes, Inc., in the County Court of Lee County and obtained final judgment in the amount of Six Hundred Fifty Dollars ($650.00) plus costs. This judgment was entered on December 2, 1975.

Recommendation Based on the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Florida Construction Industry Licensing Board suspend the license of James Raskin as a registered general contractor until he presents satisfactory proof to the Board of his financial qualifications to engage in the contracting business. DONE and ORDERED this 27th day of May, 1977, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blacks tone Building Jacksonville, Florida 32202 James Raskin 1810 S. E. 44th Street Cape Coral, Florida 33904 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211

# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. RICHARD A. VALDES, 79-000956 (1979)
Division of Administrative Hearings, Florida Number: 79-000956 Latest Update: May 19, 1980

The Issue Whether Respondent, a certified general contractor, is guilty of pulling permits for construction projects not supervised by Respondent, and, if so, the appropriate disciplinary action which should be taken by the Board.

Findings Of Fact At all times material hereto, Respondent was the holder of Certified General Contractor's License No. CG C005204 issued by the Board. Although this license was active at the time the Administrative Complaint was filed, Respondent has placed it on an inactive status until June 30, 1981. (Stipulation, Testimony of Respondent) As to Amiguet Construction Project During 1976, Jose Amiguet entered into a contract with San Pedro Construction Inc. for the construction of an addition to his existing residence located at 1409 Granada Boulevard, Coral Gables, Florida. (Stipulation, Petitioner's Exhibit 1) Since San Pedro Construction Inc. was not properly licensed as a building contractor, it was not qualified to apply for and obtain a Coral Gables building permit to undertake this residential addition. Therefore, on January 12, 1977, pursuant to an agreement with Jose San Pedro, representative of San Pedro Construction Inc., the Respondent applied and obtained the required Coral Gables building permit under his on name. (Stipulation, Testimony of Respondent, Charles Kozak, Petitioner's Exhibit 1) The Respondent did not participate in, manage, or supervise, in any manner, the construction of the Amiguet residential addition by San Pedro Construction Inc. Jose Amiguet neither knew the Respondent, nor had any dealings with him during the construction work. (Stipulation, Testimony of Respondent) Final inspection of the Amiguet construction project has not been conducted by the Coral Gables building inspection department since the required documentation concerning sidewalk improvements and subcontractors used has not yet been submitted. The actual construction work has, however, been completed, to the satisfaction of Jose Amiguet. (Testimony of Charles Kozak, Respondent) Respondent made an effort to assist Jose Amiguet in obtaining the final inspection and clearance by the city building inspection department. However, since Respondent did not supervise the subcontractors' work, he cannot truthfully complete the required documents. He has, therefore, offered to (1) pay for the additional costs associated with obtaining the necessary final inspection, and (2) transfer to Jose Amiguet the right to receive, after final inspection, the refund of the contractor's performance bond in the amount of approximately $400-$500. (Testimony of Respondent) As to the Shaw Construction Project During July, 1977, and on February 8, 1978, James L. Shaw entered into separate contracts with San Pedro Construction Inc. for the construction of residential improvements at 836 Obispo Avenue, Coral Gables, Florida. The final contract was in the amount of $16,700.00. (Stipulation, Testimony of Respondent, James L. Shaw, Petitioner's Exhibit 4) Since San Pedro Construction Inc. was an unlicensed contractor, Respondent, on November 15, 1977, pursuant to an agreement with that company, applied for and obtained the required Coral Gables building permit. (Stipulation, Testimony of Respondent, James L. Shaw, Petitioner's Exhibit 4) The Respondent did not participate in, manage, or supervise in any manner the construction of the Shaw residential improvements by San Pedro Construction Inc. James Shaw neither knew Respondent, nor had any dealings with him during the construction work. (Stipulation, Testimony of Respondent) On or about April, 1978, the lending institution for the Shaw project, and James Shaw stopped making construction payments to San Pedro Construction Inc., due to its failure to proceed on and abandonment of the project. (Testimony of James Shaw, Charles Kozak) On June 20, 1978, James Shaw obtained an "owner-builder" permit from the City of Coral Gables and incurred the following costs in order to complete the construction project as originally planned: $12,000 for labor and materials, and $625.00 for architectural services. Inasmuch as approximately, $10,128.00 had earlier been paid to San Pedro Construction Inc. for the construction project, the total cost of the project to James Shaw was approximately $22,753.00-$6,053.00 in excess of the original contract price. (Testimony of James Shaw and Respondent) San Pedro Construction Inc. is no longer in business, and the whereabouts of its owner, Jose San Pedro, is unknown. (Testimony of Respondent) As with the Amiguet construction project, final inspection of the Shaw project cannot be conducted until missing documentation relative to sidewalk improvements and subcontractors involved is supplied. In an effort to assist James Shaw, the Respondent has offered to transfer to Shaw the right to receive, after final inspection, the refund of the contractor's performance bond in the amount of approximately $400-$500. (Testimony of Charles Kozak and Respondent) At all times material hereto, the Respondent was aware that it was unlawful, under both state law and the Code of Metropolitan Dade County, to aide an unlicensed contractor in evading the contractor licensing law, and to use one's license to pull permits for projects not supervised by the licensee. (Stipulation, Testimony of Respondent, Petitioner's Exhibit 1) The Metro Dade Construction Trades Board heard the complaint against the Respondent and found prima facie evidence and probable cause to refer the matter to the Florida Construction Industry Licensing Board (Stipulation) Notwithstanding the evidence presented, the Administrative Complaint and the Board's counsel at hearing limited the amount sought for restitution purposes to $5,300.00, provided both the performance bonds are refunded to the benefit of Jose Amiguet and James Shaw. (Administrative Complaint, statement of Board's Counsel) Respondent regrets having taken the actions complained of in the Board's Administrative Complaint, and now more fully understands the resulting burdens which have been placed on Jose Amiguet and James Shaw. (Testimony of Respondent)

Recommendation Guilty, as charged. Respondent's certified general contractor's license should be suspended until such time as full restitution is made to the persons damaged by his actions.

Florida Laws (2) 120.57489.129
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer