Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: The Tamaron wastewater treatment facility (facility), located at 3800 Gatewood Drive, Sarasota, Florida, serves the Tamaron residential subdivision which was originally developed by U. S. Homes Corporation in 1976. The subdivision presently consists of 499 homes and was completely built out in the mid-1980's. The facility was originally owned and operated by U. S. Homes Corporation. Tamaron Utilities, a nonprofit entity comprised of the 499 homeowners, acquired the facility in November, 1987. At that time, the facility's existing operating permit was transferred to Tamaron Utilities. The facility is overseen by an elected board of volunteer homeowners. The Department is the agency of the State of Florida that is authorized to regulate domestic wastewater treatment and disposal facilities and permit their construction and operation. It is the successor agency to the Department of Environmental Regulation. By letter dated November 10, 1987, the Department notified Tamaron of the requirements of Chapter 87-303, Laws of Florida (Grizzle-Figg Amendment), which amended Section 403.086, Florida Statutes, and of the Department's intention to modify Tamaron's operating permit to incorporate a schedule of compliance with Section 403.086, Florida Statutes, as amended by Chapter 87-303, Laws of Florida. On August 23, 1988, an operating permit (D058-141783), which contained secondary water treatment requirements, was issued to the facility. Specific condition 7 of the permit required that the facility be in compliance with the Grizzle-Figg Amendment by October, 1990, or eliminate discharge to surface waters. On September 5, 1990, Tamaron filed an application with the Department to renew its domestic waste water treatment and disposal systems operation permit. Tamaron did not consider its facility as discharging waste into one of the specifically named water bodies set forth in the Grizzle-Figg Amendment or to "water tributary thereto" and thereby required to meet the advanced waste treatment criteria set forth in the Grizzle-Figg Amendment. However, in an abundance of caution, Tamaron proceeded to bring its facility into compliance with the advanced waste treatment criteria as set forth in the Grizzle-Figg Amendment. After numerous requests for additional information and several meetings between Tamaron and the Department, the Department issued its Notice of Permit Denial on April 9, 1991, asserting that Tamaron had not provided: (a) reasonable assurance that the requirements of Section 403.086(1)(c), Florida Statutes, mandating advanced waste treatment (AWT) before discharge to certain designated surface waters, would be met and; (b) reasonable assurance that the discharge to those certain designated surface waters would result in minimal negative impact as required by Section 403.086(5)(a), Florida Statutes. The facility continues to operate under its secondary treatment permit No. DO58-141783. The facility consists of a wastewater treatment plant designed for secondary treatment, with tertiary filtration. The design capacity of the facility is 155,000 gallons per day (0.155MGD) with actual flows of slightly over 100,000 gallons per day (0.100MGD+). Three percolation ponds surround the facility comprising the primary effluent disposal method for the facility. The Tamaron subdivision has a series of excavated surface water bodies (stormwater lakes), hydraulically connected, which eventually discharge at the northeast corner of the subdivision into Phillippi Creek. The direct path of surface water flow is from the subdivision's stormwater lakes to Phillippi Creek. These stormwater lakes are in multiple ownership. Under Department policy, stormwater systems permitted by the Department, its predecessor DER, or a water management district solely as stormwater treatment facilities under Chapter 17-25, Florida Administrative Code, are not considered "waters of the State". However, stormwater systems built prior to Chapter 17-25, Florida Administrative Code, permitting requirements, were considered "waters of the State" if they discharge more frequently than a twenty five year, twenty-four hour storm event. See Petitioner's exhibits 13 & 15. Tamaron's stormwater system was built prior to Chapter 17-25, Florida Administrative Code, permitting requirements, and was designed to discharge at a ten year, twenty-four hour storm event which is more frequent than a twenty five year, twenty-four hour storm event. Discharge of water into Phillippi Creek from the subdivision's stormwater lakes is fairly frequent; however, the volume of the discharge is low. Phillippi Creek is a natural surface water which eventually flows into Roberts Bay. Roberts Bay is a specifically named water body in the Grizzle-Figg Amendment (Section 403.086(1)(c), Florida Statutes). Since September, 1989, Tamaron has retained William Murchie, P.E. of AM Engineering, to evaluate the design and operation of the facility in order to comply with appropriate regulatory requirements. The facility provides biological treatment through a contact stabilization utilizing an activated sludge. This process typically provides high quality advanced secondary biological treatment. A chemical feed tank system utilizing ferrous sulfate was added to the facility several years ago to chemically precipitate out total phosphorus to meet the advanced waste treatment requirements. High-level disinfection is achieved in the large chlorine contact chamber and through two tertiary filters. At the design flow of 0.155MGD, the chlorine contact chamber provides nearly 80 minutes of contact time, while actual contact time for existing flows, not including time in filters, is calculated at 110 minutes. Upon leaving the chlorine contact chamber and the biological treatment components of the facility, the chlorinated effluent is directed through two tertiary filters to reduce the biochemical oxygen demand (BOD) and total suspended solids (TSS). After the tertiary filters, the effluent passes through the sample block where it is sampled for TSS, BOD and chlorine and is then piped sequentially into the first, second and third percolation ponds. The percolation ponds span two acres and provide residence time of 35 to 45 days, during which time the effluent is further biologically treated and nitrogen is reduced. From the percolation ponds, the effluent is pumped into a low pressure system which uniformly distributes effluent over two nitrogen reduction filters. The nitrogen reduction filters are located north of the plant and are immediately adjacent to one of the subdivision's stormwater lakes. The nitrogen reduction filters consist of deep sand beds covered with Bermuda grass to provide high nitrogen uptake. The irrigation of the two nitrogen reduction filters is alternated every half day. These nitrogen reduction systems were modified in October/November, 1990, by adding 3 to 3 1/2 feet of clean sand with a permeability rate of 28 feet per day, planting Bermuda grass, and installing an irrigation/distribution system. These filters replaced two sand pits with shallow layers of very coarse sand, after initial testing demonstrated the sand pits to be inadequate in removing nutrients consistent with statutory requirements. In January, 1992, an underdrain system utilizing perforated pipe was installed in the nitrogen reduction filters to create an aerobic zone and to provide a representative sample port after nutrient reduction in the filters. This sample port, used for the biweekly monitoring, consists of a single solid pipe, that collects effluent from the perforated pipes, with a tap to prevent discharge into the adjacent stormwater lake, except during sampling events. The biweekly sampling event results in effluent being discharged from the pipe for approximately 30 minutes to flush the pipe so as to get a proper sample. The underdrain sampling port at the nitrogen reduction filters replaced two earlier monitor wells between the nitrogen reduction filter and the stormwater pond, which proved ineffective because of their location. The perforated underdrains are situated in filter bed sand of medium grain size with a permeability rate 100 feet per day and located below 3 - 3 1/2 feet of clean sand with a permeability rate of 28 feet per day and above very permeable layers of sand, stone and coarse shell. (See Tamaron's exhibit 23 and Department's exhibit 14) The very permeable layers of sand, coarse shell, the perforated pipe and the single solid pipe are all located above the ground water table. Since the perforated pipe and sample port are both located above the ground water level and the surface of the adjacent stormwater lake, it is unlikely that the effluent sample taken from the sample port would be influenced by the ground water or a back flow of water from the adjacent stormwater lake. The coarse shell layer situated below the nitrogen reduction filters extends to the edge of the adjacent stormwater lake. Therefore, the effluent, other than the effluent trapped in the perforated pipe and carried to the sample port, that is irrigated onto the nitrogen reduction filters passes through the sand and into the coarse shell layer. The effluent is then transported laterally through the coarse shell layer to the underground edge of the adjacent stormwater lake where there is a subsurface discharge into the adjacent stormwater lake. Since the discharge to the stormwater lakes is primarily subsurface in nature, the logical compliance point to measure effluent parameters would be the underground sample port which collects the effluent prior to subsurface discharge into the stormwater lake. See Petitioner's exhibit 15. The direction of ground water flow at the facility is towards the north to the adjacent stormwater lakes as evidenced by the hydraulic gradient of the site determined using ground water table elevations. The location for sampling effluent from the facility for compliance with secondary standards was described in Specific Condition 5 of Tamaron's previous permit No. D058-141783 dated August 23, 1988. Specific Condition 5 states that the discharge from the chlorine contact chamber shall be sampled in accordance with Chapter 17-19, Florida Administrative Code, (now Chapter 17-601, Florida Administrative Code), for compliance with the stated secondary limits. The facility's tertiary filters are located after the chlorine contact chamber. Tamaron samples effluent for compliance with secondary standards (BOD,TSS, chlorine) at the sampling box after disinfection and tertiary filtration. Tertiary filtration is designed to achieve a more efficient removal of TSS and BOD. The resulting effluent is usually of higher quality than secondarily treated effluent. A secondary plant with tertiary filtration is referred to as an "advanced secondary treatment" plant. Data presented by Tamaron titled Tamaron 1991-1993 Data On FDER Permit Compliance (Tamaron's exhibit 17, page 1 of 2) shows reported values, sampled after tertiary filtration at the sample box, which suggest that secondary treatment parameters, including fecal coliform, are not being exceeded. The data actually shows a very high removal rate for the parameters sampled. The United States Environmental Protection Agency issued a National Pollutant Discharge Elimination System (NPDES) permit, number FL0042811, to Tamaron for the facility with an effective date of June 1, 1991, which authorized Tamaron to discharge from the facility to the receiving waters named Phillippi Creek to Roberts Bay in accordance with the effluent limitation, monitoring requirements and other conditions set forth in the permit. Since the facility was located in the Grizzle-Figg Amendment area of Florida certain changes were made from the draft permit to the final permit. Those changes appear in the Amendment To The Statement Of Basis At The Time Of Final Permit Issuance which is made a part of the final permit. The amendment provides for changes in Part I, Effluent Limitations and Monitoring Requirements. These changes, among other things, require that the Grizzle-Figg Amendment annual limits of 5 mg/l BOD, 5mg/l TSS, 3mg/l total nitrogen and 1mg/l total phosphorus be added to the effluent limits to adequately maintain water quality standards, and added monitoring requirements and measurement frequency regulations to give the basis for permit limits and conditions in accordance with Chapters 17-302, 17-600 and 17-601, Florida Administrative Code. Data presented by Tamaron titled Tamaron 1991-1993 Data On NPDES Permit Compliance (Tamaron's exhibit 17, page 2 of 2) show reported values sampled after nitrogen reduction filters which suggest that the maximum values for AWT parameters, including fecal coliform, are not being exceeded, particularly after January, 1992, when Tamaron began sampling effluent collected by the perforated underdrains at the sample port. Tamaron has been monitoring and reporting compliance under its final NPDES permit and providing copies to the Department. There was no evidence that Tamaron was ever in violation of its NPDES permit. Tamaron submitted documentation to the Department with its permit application that demonstrated high-level disinfection within the facility was being achieved. However, TSS was being sampled after the application of the disinfectant. Using this procedure, the facility continued to achieve high- level disinfection until the permit denial. After the permit denial, the facility resumed basic disinfection which was required under Tamaron's permit for secondary treatment. This same data indicates that there was compliance with the requirements for fecal coliform. The record is not clear as to the frequency and number of samples taken to provide the data for reporting compliance with the NPDES permit and the data presented in Petitioner's exhibit 17, page 2 of 2. However, there was no evidence, other than sampling for TSS after the disinfectant was added, that Tamaron was not complying with its NPDES Permit that required, among other things, that the monitoring requirements and measurement frequency of the Department's rules and regulations be followed by Tamaron. Tamaron has modified and upgraded the facility in order to achieve a treatment process which will produce effluent of a quality for discharge under the Grizzle-Figg Amendment. Tamaron has provided reasonable assurances, although not absolute assurance, that the facility can comply with the discharge permit requirements of Chapter 403, Florida Statutes, including Section 403.086, Florida Statutes, notwithstanding the testimony of Jay Thabaraj to the contrary concerning Tamaron's sampling technique and its method of obtaining high-level disinfection which can be addressed as a specific condition, if necessary. Studies conducted by the Tamaron's engineer included in Petitioner's exhibit 21 indicates that there was no adverse impact to the stormwater lakes from the facility's wastewater treatment and disposal system. Tamaron has provided reasonable assurances that the point of discharge is a reasonably access point, where such discharge results only in minimal negative impact.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department enter a final order granting Tamaron an operating permit for its facility as secondary treatment facility. In the alternative, that the Department enter a final order granting Tamaron an operating permit for its facility that requires compliance with the advanced waste treatment criteria set forth in Section 403.086(4), Florida Statutes, that, in addition to any general or specific conditions that are normally required, contains specific conditions that: (a) contains specific instructions on sampling technique, sampling frequency and reporting as set forth in Rule 17- 740(1)(b)2., Florida Administrative Code, and (b) sets forth compliance with high-level disinfection, with a time limit for compliance, that accomplishes the intent of the rule, if not the strict letter of the rule, without total redesign of the facility. DONE AND ENTERED this 3rd day of May, 1994, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of May, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-2968 The following constitutes my specific rulings, pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Petitioner, Tamaron's Proposed Findings of Fact: The following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1(1); 2(2); 3(3); 4(5,6); 5(6); 6(7); 8(12); 10(8); 11-12(13-25,38); 13(31-34); 14(8); 15(13); 16(14); 17-18(15); 19(36); 20(16); 21(17); 22(18); 23(19); 24(20); 25(21);26(22); 32(32,7); 33(33); 34(32,32); 36(31); 39-40(34); 41(36); 42- 43(34); 44(35); 47(4); and 51(10). Proposed findings of fact 27-31, and 35 are conclusions of law rather than findings of fact.. Proposed findings of fact 45, 46, 48-50, 56, 57, 59, and 61-72 are arguments rather than findings of fact. Proposed findings of fact 7, 9, 37, 38, 52-55, 58 and 60 are neither material nor relevant. Respondent, Department's Proposed Findings of Fact: The following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1(1,6); 2(2); 3(4,10); 5(9); 6(9,10); 8(11); 9-17(18-27); 18(8); 19(13); 20(5); 21(17); 22(30); 23(31); 24(14); 25(17); 26(18-23); 27(34); and 32(35,38). Proposed finding of fact 4 is neither material nor relevant but see Findings of Fact 18-25. Proposed findings of fact 7, 31 and 33 are arguments rather than findings of fact. Proposed findings of fact 28-30 are conclusions of law rather than findings of fact. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Charles G. Stephens, Esquire C. Robinson Hall, Esquire Enterprise Plaza, Suite 1516 101 E. Kennedy Blvd. Tampa, Florida 33602 Francine Ffolkes, Esquire Office of General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400
The Issue The issue to be determined in this case is whether the City of Tarpon Springs (“City”) is entitled to a industrial wastewater facility permit for its proposed discharge of demineralization concentrate into the Gulf of Mexico adjacent to Pasco County, Florida.
Findings Of Fact The Parties Henry Ross is a resident of Tarpon Springs. In his petition for hearing, he alleges that he is a recreational fisherman and a "consumer of fish taken from the area" where the proposed wastewater discharge would occur. He presented no evidence at the final hearing to prove these allegations. Neither the City or the Department stipulated to facts that would establish Ross's standing. The City of Tarpon Springs is a municipality in Pinellas County and the applicant for the industrial wastewater permit that is challenged by Ross. The Department is the agency charged by law with the duty, and granted the power, to regulate the discharge of pollutants into waters of the State. The Proposed Permit - General Due to the cost of obtaining potable water from Pinellas County Utilities, the City decided to look for another source of drinking water. In February 2004, an alternative water supply plan was developed by the City’s Office of Public Services which analyzed potable water supply options. It determined that the withdrawal and treatment of brackish groundwater represented the best option for the City. The proposed permit authorizes the City to discharge industrial wastewater into waters of the State. The wastewater is demineralization concentrate, which is produced when RO technology is used to remove salts from brackish water to convert it to potable water. The wastewater would be produced in conjunction with the operation of a not-yet-constructed WTP that would supply public drinking water to the residents of the City. The City must also obtain a consumptive use permit from the Southwest Florida Water Management District for the proposed withdrawal of groundwater. Whether the Town is entitled to a consumptive use permit is not at issue in this proceeding. The industrial wastewater permit would authorize a maximum daily discharge of 2.79 million gallons per day ("mgd") of RO concentrate. The initial operation of the WTP, however, is expected to discharge 1.05 mgd. The RO concentrate would be transported via a force main from the WTP in the City to an outfall in Pasco County. The outfall would discharge the wastewater into a canal which is already being used for the discharge of cooling water from Progress Energy Florida, Inc.’s Anclote Power Generation Facility. The outfall would be 50 feet north of the point in the canal where Progress Energy is required to demonstrate compliance with its own permitting requirements, so as not to interfere with Progress Energy's ability to demonstrate compliance. There is a floating barrier in the channel north of the proposed point of discharge, and a fence along the side of the canal, to prevent swimmers, boaters, and persons on foot from getting near the Progress Energy power plant. The floating barrier and fence would also prevent swimmers, boaters, or pedestrians from reaching the proposed discharge outfall and the area of the canal where the discharge will initially mix. After being discharged into the canal, the wastewater would become diluted and flow northward, out of the canal and into the open waters of the Gulf. The prevailing currents in area would most often force the wastewater south toward Pinellas County and the mouth of the Anclote River. To determine the characteristics of the wastewater, the City's consultants collected water from the three proposed well fields for the new WTP and ran the water through a small, pilot-scale RO unit to generate an RO concentrate that is representative of the proposed RO discharge. It was determined that eight constituents of the wastewater would likely be present in concentrations that would exceed applicable state water quality standards: aluminum, copper, iron, gross alpha (a radioactivity measurement), total radium, selenium, nickel, and zinc. The Mixing Zones The Department may authorize mixing zones in which a wastewater discharge is allowed to mix with the receiving waters. See Fla. Admin. Code R. 62-4.244. Within the mixing zone, certain minimum water quality criteria must be met. At the outer boundary of the mixing zone, the applicable state water quality standards must be met. In this case, the water quality standards for Class III marine waters are applicable. The City's consultants analyzed the wastewater, receiving waters, and other factors and used an analytical model to simulate a number of mixing scenarios. In cooperation with Department staff, a separate mixing zone was established for each of the eight constituents that are not expected to meet water quality standards at the outfall. The largest mixing zone, for copper, is 1,483.9 square meters. The smallest mixing zone, for nickel, is 0.7 square meters. The mixing zones are conservatively large to assure sufficient mixing. Under most conditions, the mixing is expected to occur in a smaller area. Toxicity Analysis Among the minimum criteria that must be met within a mixing zone is the requirement to avoid conditions that are acutely toxic. See Fla. Admin Code R. 62-302.500(1)(a). A wastewater discharge is tested for potential acute toxicity by exposing test organisms to the undiluted discharge and determining whether more than 50 percent of the organisms die within a specified time period. The test organisms, mysid shrimp and silverside minnow, are sensitive species. Therefore, when a discharge is not acutely toxic to these organisms, it can be reasonably presumed that the discharge would not harm the native organisms in the receiving waters. The acute toxicity test for the proposed RO concentrate indicated zero toxicity. The Department requested that the City also analyze the potential chronic toxicity of the proposed discharge. A wastewater discharge shows chronic toxicity if exposure to the discharge adversely affects the growth and weight of the test organisms. The tests performed on the representative discharge showed that the proposed discharge of RO concentrate would not create chronic toxicity in the mixing zones. Petitioner’s expert witness, Ann Ney, did not review the toxicity analyses or other water quality data that were submitted to the Department by the City. However, she expressed a general concern about a salty discharge that could create stratification in the canal with higher salinity at the bottom of the canal that might be hypoxic (little or no dissolved oxygen). The more persuasive evidence shows that salinity stratification, or a hypoxic condition, is unlikely to occur. The proposed permit requires the City to conduct quarterly chronic toxicity tests. The permit also requires the City to periodically test the water and sediments for any unexpected cumulative effects of the discharge. Evaluation of Disposal Options Florida Administrative Code Rule 62-620.625(6) requires that an applicant for a permit to discharge demineralization concentrate must investigate disposal options potentially available in the project area. The City evaluated blending the discharge concentrate with the City's re-use water irrigation program or with the City’s domestic wastewater discharge into the Anclote River. The RO concentrate was too salty for irrigation use and there was an inadequate volume of domestic wastewater available throughout the year. In addition, the Anclote River is an Outstanding Florida Water and, therefore, is afforded the highest water quality protection under Department rules. See Fla. Admin. Code R. 62-4.242(2). The City also looked at underground injection but that was economically unreasonable and there was concern about upward migration of the discharge. It was economically unreasonable to discharge the concentrate farther out into the Gulf. Anti-degradation Analysis For a proposed new discharge, a permit applicant must demonstrate that the use of another discharge location, land application, or recycling that would avoid the degradation of water quality is not economically and technologically reasonable. See Fla. Admin. Code R. 62-4.242(1)(d). As discussed above, the City investigated other disposal options, but they were not economically or technologically reasonable. An applicant for a permit authorizing a new discharge must demonstrate that any degradation is desirable under federal standards and under circumstances that are clearly in the public interest. See Fla. Admin. Code R. 62-302.300(17). In determining whether a proposed discharge is desirable under federal standards and under circumstances that are clearly in the public interest, the Department is required by Rule 62-4.242(1)(b) to consider the following factors: Whether the proposed project is important to and is beneficial to public health, safety or welfare (taking into account the policies set forth in Rule 62-302.300, F.A.C., and, if applicable, Rule 62-302.700, F.A.C.); and Whether the proposed discharge will adversely affect conservation of fish and wildlife, including endangered or threatened species, or their habitats; and Whether the proposed discharge will adversely affect the fishing or water-based recreational values or marine productivity in the vicinity of the proposed discharge; and Whether the proposed discharge is consistent with any applicable Surface Water Improvement and Management Plan that has been adopted by a Water Management District and approved by the Department. The proposed project is important to and is beneficial to public health, safety or welfare because it would provide drinking water for the public. In addition, the treatment and use of brackish groundwater converts otherwise unusable water into a valuable resource. The use of brackish water avoids the use of water in the surficial aquifer that is used by natural systems, such as wetlands. The Florida Legislature has found that the demineralization of brackish water is in the public interest, as expressed in Section 403.0882, Florida Statutes (2010): The legislature finds and declares that it is in the public interest to conserve and protect water resources, provide adequate supplies and provide for natural systems, and promote brackish water demineralization as an alternative to withdrawals of freshwater groundwater and surface water by removing institutional barriers to demineralization and, through research, including demonstration projects, to advance water and water by-product treatment technology, sound waste by-product disposal methods, and regional solutions to water resources issues. The proposed discharge would not adversely affect conservation of fish and wildlife. Because the discharge is not toxic to sensitive test organisms provides reasonable assurance that the native fish and other aquatic life would not be adversely affected by the discharge. The only identified threatened or endangered species that frequents the canal waters is the endangered Florida Manatee. Manatees use the canal because of its relatively warm waters. Manatees come to the surface to breathe and they drink fresh water. There is no reason to expect that a manatee moving through the mixing zones would be adversely affected by the RO concentrate. The Florida Fish and Wildlife Conservation Commission, which has primary responsibility for the protection of endangered and threatened species, did not object to the proposed permit. Manatees and many other aquatic species use seagrasses as food or habitat. There are no seagrasses in the area of the canal into which the RO concentrate would be discharged, but there are dense seagrass beds nearby. The proposed discharge would have no effect on the seagrasses in the area. The proposed discharge would not adversely affect fishing or water-based recreational values or marine productivity in the vicinity of the proposed discharge. Because the proposed discharge is non-toxic and would meet Class III water quality standards before reaching the closest areas where humans have access to the canal and Gulf waters, there is no reason to believe that the proposed discharge would be harmful to humans. The proposed discharge would not adversely affect recreational activities, such as swimming, boating, or fishing. Petitioner presented the testimony of two fishermen about fishing resources and water flow in the area, but no evidence was presented to show how the proposed discharge would reduce marine productivity. Petitioner contends that the proposed discharge would adversely affect the Pinellas County Aquatic Preserve. However, the aquatic preserve is two miles away. The proposed discharge would probably be undetectable at that distance. It would have no effect on the waters or other resources of the aquatic preserve. With regard to the requirement that the proposed discharge be consistent with an adopted and approved Surface Water Improvement and Management Plan for the area, there is no such plan.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that the Department issue a final order determining that Petitioner lacks standing, and approving the issuance of the industrial wastewater facility permit to the City. DONE AND ENTERED this 16th day of December, 2010, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 16th day of December, 2010. COPIES FURNISHED: Nona R. Schaffner, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Thomas J. Trask, Esquire Frazer, Hubbard, Brandt & Trask, LLP 595 Main Street Dunedin, Florida 34698 Henry Ross 1020 South Florida Avenue Tarpon Springs, Florida 34689 Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Tom Beason, General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Mimi Drew, Secretary Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000
Findings Of Fact During 1990, Respondent/Applicant, City of Lynn Haven, filed several applications with the Respondent, Department of Environmental Regulation, seeking the issuance of several permits to build a wastewater collection system and a two million gallon per day advanced wastewater treatment (AWT) plant. The proposed facility is intended to replace the wastewater treatment facility currently being used by the City of Lynn Haven. After a review of the applications the Department proposed several Intents to Issue covering the different aspects of the proposed projects. The Intents to Issue included: A) a variance and dredge and fill permit, pursuant to Sections 403.201, 403.918, 403.919, Florida Statutes, and Rule 17-312, Florida Administrative Code, authorizing a subaqueous crossing of North Bay (Class II waters) and installation of a force main (permit #031716641), B) a collection system permit, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-600 and 17-604, Florida Administrative Code, for the installation of approximately 11 miles of pipe from North Bay to the proposed treatment plant, C) a dredge and fill permit #031785181, pursuant to Sections 403.918, 403.919, Florida Statutes, and Rules 17-4, 17-312, Florida Administrative Code, authorizing 10 incidental wetland crossings associated with the collection system, and, D) a construction permit #DC03-178814, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-302, 17-600 and 17-611, Florida Administrative Code, authorizing the construction of a 2.0 mgd wastewater treatment plant. Sand Hill Community Improvement Association challenged the Department's Intents to Issue. The Sand Hill Community Improvement Association (Sand Hill) is an association composed of 74 formal members plus numerous supporters. Both members and supporters are residents who live near the site of the proposed Lynn Haven sewage treatment plant. They are sufficiently close to the plant site that construction of the proposed project could impact their property. The members are very concerned about any threat of pollution to the aquifer from the proposed plant since all of the members are dependent on private wells for their drinking water. Additionally, members of the association use the proposed site, as well as the associated wetlands, Burnt Mill Creek and the nearby lakes, for a variety of recreational purposes, including hunting, fishing, hiking, bird-watching, boating and swimming. Given these facts, the Association has standing to challenge the Department's Intents to Issue involved in this case. The City of Lynn Haven is located on a peninsular section of the south shore of North Bay and, except for its connection to the land, is surrounded by environmentally sensitive Class II or Class I waters. Lynn Haven's existing wastewater treatment plant was poorly designed, has not worked properly, and is old and outdated. The plant is permitted to treat up to 950,000 gallons per day. However, the existing plant is currently exceeding its originally permitted treatment limits and is treating in excess of 1,200,000 gallons per day. The sewage only receives secondary treatment, Secondary treatment is the minimum state standard for wastewater treatment. The secondarily treated wastewater is pumped several miles to a spray irrigation site located in the eastern portion of the City. The sprayfield site has never worked properly due to a high groundwater table and a confining layer of soil, both of which prevent the effluent from percolating into the ground. Because the sewage effluent cannot percolate into the ground, the existing operation frequently results in direct runoff into a ditch which empties into North Bay, a Class II waterbody. Such discharge of wastewater effluent into Class II waters is prohibited by Department regulations. 1/ At this time, the existing wastewater treatment facility is in violation of both DER and EPA standards and is under enforcement action by both agencies. The existing facility is currently operating without a permit and the Department has advised Lynn Haven that the existing facility as it now operates can not be permitted. In fact, all the parties agree that the City is in serious need of a wastewater treatment facility which works and does not pollute the environment. However, the parties disagree over the method by which proper wastewater treatment could be accomplished by Lynn Haven. Since 1972, the City, through various consultants and with the aid of DER, has reviewed approximately 40 alternatives for wastewater disposal. After this review, the City of Lynn Haven selected the alternative which is the subject of this administrative hearing. The alternative selected by the City of Lynn Haven consists of the construction of a proposed advanced wastewater treatment (AWT) plant and distribution system. The new plant will be on a 640 acre parcel of property located approximately 12 miles north of Lynn Haven. The location of the new plant will necessitate the rerouting of the wastewater from the old plant to the new plant by construction of a new transmission line approximately 12 miles north of the City across North Bay and parallel along State Road 77. 2/ The treatment process proposed for use in the new AWT plant is known as the AO2 process. The process is patented. The AO2 treatment process primarily consists of biological treatment with settling and filtration. The treatment process also includes a chemical backup treatment to further reduce phosphorus if necessary. The evidence demonstrated that this type of facility has been permitted by the Department in at least five other wastewater facilities throughout the state. The treatment facility will have a two million gallon per day, lined holding pond on site for the purposes of holding improperly treated wastewater for recirculation through the proposed facility. Any excess sludge generated by this treatment process would be routed to lined, vacuum-assisted, sludge drying beds. The sludge would then be transported offsite to a permitted landfill for disposal. The evidence demonstrated that this treatment process would not produce any objectionable odors. Once the wastewater is treated, it will be disinfected by chlorination to eliminate pathogens. The chlorination process is expected to meet state standards. After chlorination, a dechlorination process would occur to remove any chlorine residuals which would have a harmful affect on the environment. The treated wastewater would then be re-aerated and discharged through the distribution system indirectly into a wetland located on the 640 acre parcel of property. The quality of the treated wastewater is expected to meet the advanced wastewater treatment (AWT) standards. These standards are five milligrams per liter total suspended solids (T.S.S.), five milligrams per liter BOD, three milligrams per liter nitrogen (N), one milligram per liter phophorus (P). Ph will be in the range of six to eight units on an average annual basis and can be adjusted up or down if necessary to meet the ph levels of the ecology into which the wastewater ultimately flows. This effluent quality is approximately five times cleaner than secondarily treated effluent. Additionally, as a condition of the draft permit, the proposed facility would be operated by a state-licensed operator and would be routinely monitored to insure that the treated wastewater effluent meets advanced wastewater treatment standards. Given these facts, the evidence demonstrated that the applicant has supplied reasonable assurances that the plant will perform as represented and that the effluent will meet the state standards for advanced wastewater treatment. As indicated earlier, the site for the proposed AWT plant contains approximately 640 acres and is located approximately 12 miles north of Lynn Haven in an area known locally as the Sand Hills. The City specifically purchased this parcel of property for the construction of the proposed wastewater treatment plant. The plant itself would be located in the northeast corner of the property. The 640 acre site was previously used for silviculture. The entire area is currently planted in pines except for a low area that is dominated by a pristine, woody wetland system of titi. The titi wetland is approximately 212 acres in size and generally runs through the center of the property from the northeast to the southwest. The wetland is low in acidity, with an estimated ph between 4 and 5. The site consists of hilly, mineralized soils. The soils within the forested wetland are organic in nature. Based on the evidence at the hearing, there does not appear to be any significant confining layers of soil which would prevent the treated wastewater from percolating in the soils and draining towards the wetland and ultimately into Burnt Mill Creek, a Class III waterbody. Once the effluent leaves the plant, it would go through a distribution system. The proposed distribution system will consist of six, 500 foot long, 12 inch diameter perforated pipes. Each 500 foot section of pipe has 100 one and one-half inch orifices which will discharge the treated effluent onto an eight foot wide concrete pad. This concrete pad will dissipate the effluent's energy, prevent erosion at the orifice site and insure that the effluent sheetflows onto and eventually into the sandy soils of the plant site and ultimately into the receiving wetland. The distribution pipes are located around the east, north and western portions of the receiving wetland and are variously set back from the receiving wetland approximately 80 to 200 feet. The distribution system is designed with valves to allow for routing of flow to different branches of the system if it is determined through long term monitoring that there is a need to allow for any of the receiving wetland to dry out. None of the distribution branches are located in any jurisdictional wetlands of the State of Florida. The receiving wetland will receive a hydraulic loading rate of approximately 1.8 inches per week once the new advanced wastewater treatment plant is operating at capacity. Both the surface waters and groundwaters on the 640 acre parcel flow from northeast to southwest across the property. The evidence clearly demonstrated that any treated wastewater discharged on the site would move down hill by surface or groundwater flows towards the wetlands in the central portion of the property and eventually discharge into Burnt Mill Creek located at the southwest corner of the parcel. The evidence demonstrated that it would be highly unlikely for the surface or groundwater to move in any other direction and would be unlikely for the surface or groundwater to move towards any residents located to the north or east of this parcel. Evidence of the topography and its relatively sharp gradient clearly demonstrated that the treated wastewater discharged in the northeast corner of this site would not result in any significant still water ponding and would exit the site at the southwest corner of the property in approximately 14 hours. The evidence did demonstrate that, depending on the wetness of the weather, there may likely be certain times of the year when a flowing type of ponding would occur. However, this wet weather ponding was not shown to be of a duration which would impact to a significant degree on the flora and fauna of the area or increase the number of disease bearing mosquitoes in the area. As indicated earlier the treated effluent from the proposed AWT plant will flow into Burnt Mill Creek. Burnt Mill Creek will ultimately carry the treated wastewater approximately 11 miles down stream to North Bay. The City can directly discharge up to two million gallons per day of AWT water into Burnt Mill Creek without violating state water quality standards. Therefore, the volume of wastewater discharged into Burnt Mill Creek should not have significant impacts on surface and ground water quality. Moreover, Chapter 17-611, Florida Administrative Code, authorizes the discharge of up to 2 inches per week to receiving wetlands provided wastewater is treated to AWT standards. The evidence demonstrated that this rule was developed as an experimental effort to determine if wetlands could be appropriate areas for wastewater effluent to be either discharged or treated. These state limits were intended to be very conservative limits and were designed to insure that the impacts to receiving wetlands would be minimal. The evidence and testimony demonstrated that the receiving wetland system involved in this case should not be adversely impacted beyond those limits set forth in Section 17-611.500, Florida Administrative Code, for flora, fauna, macroinvertebrates, fish or vegetation and will meet all standards set forth in Chapter 17-611, Florida Administrative Code. However, it should be noted that the wetland/wastewater program is highly experimental and very little is known about the actual impacts of wetland/wastewater systems since facilities similar to the one proposed by Lynn Haven have not yet been placed in service. The evidence did show that there would be some long term impacts to flora and fauna in the wetland area primarily due to ponding, changed ph and the introduction of nutrients and pollution in the form of the effluent. However, the regulation does allow for some change within a receiving wetland and the evidence did not demonstrate that these changes would be significant or detrimental. Petitioners' own witness concluded that other deep wetland treatment systems are doing a very good job in meeting state water quality standards. Although Petitioners' expert noted potentially adverse impacts to flora and fauna from other wastewater treatment systems, these other systems were slow moving, impoundment-type systems that are not similar to the wastewater/wetlands system proposed by the City of Lynn Haven. The Lynn Haven system is designed for percolation and sheetflow, not ponding. Though there should be some expected changes, no evidence was provided that the receiving wetlands for the Lynn Haven facility would be affected to the extent there would be violations of any standard as set forth in Chapter 17-611, Florida Administrative Code. In essence, the legislature has determined that such experimentation with wetland areas is appropriate, albeit, even with the conservative limits of DER's rule, may prove to be a mistake. This facility is designed to fit within that rule and in fact is probably the best technology available for use in a wetland/wastewater situation. Finally, in order to avoid any potential impacts on the area which may over time become significant an approved monitoring program for surface water quality and affects on flora and fauna, as well as a groundwater monitoring program are required as conditions of the permit. The groundwater monitoring program has been designed to monitor any potential long term impacts to groundwater. With these protections there should not be any significant adverse impacts to surface or groundwater quality and the applicant is entitled to a construction permit for the AWT plant and distribution system. Lynn Haven's sewage would reach the proposed AWT plant through a transmission line. The transmission line would run from Lynn Haven's existing wastewater treatment plant across North Bay and through the unincorporated area of South Port. The Southport area is not sewered and utilizes individual septic tanks for its sewage. The transmission line would be constructed entirely in state road right-of-way. The line would terminate at the 640 acre site described above. A new, variable speed pumping station would be constructed adjacent to the old wastewater treatment plant. From this pump station, a 24 inch line would be constructed on City right-of-way up to the south shore of North Bay. At this point, the transmission line would be reduced in size to 20 inches and would be embedded approximately three feet below the Bay bottom. An additional variable speed pumping station would be located approximately half way along the 12 mile route of the transmission line to insure adequate pressure to pump wastewater to the new wastewater treatment plant. The pumps are to be employed to insure that the wastewater is continuously pumped uphill to the new site so that waste does not set, become septic, and create odor problems. The pumps are equipped to provide for chemical control of odor if necessary. Also, as a condition of the permit, the pumping stations are required to have backup power supplies should power be lost to the stations. The pumping stations and backup power supplies are to be tested monthly and the pumps are required to be continuously monitored by radio telemetry to insure they are operating properly. Additionally, the City of Lynn Haven will be required, as a condition of the permit, to visually inspect the entire length of the wastewater transmission line three times per day. The portion of the transmission line which would cross North Bay is approximately 3000 feet in length and would be constructed of high density polyethylene pipe (HDPE) with a wall thickness of one and one-half inches. HDPE pipe is used to transport materials such as hazardous wastes where leakage is not permissible. This type of pipe is virtually inert in that it is highly resistant to corrosion and other chemical reactions. It is also impact resistant and has a very high tensile strength. The pipe comes in 40 foot segments and is heat welded (fused) together. This type of joint significantly reduces the chance of any leakage. In fact, leakage around pipe joints is more likely to occur with other types of pipe and pipe connections. HDPE pipe is currently carrying wastewater across Watson Bayou in Bay County, Florida. 3/ There have been no reported problems with leaks or breaks occurring in the pipe crossing Watson Bayou. Given these facts, the probability of the proposed HDPE pipe leaking or breaking is extremely low, albeit not impossible, and such pipe appears to be the best material available for constructing a wastewater treatment transmission line across protected waters of the State. As a condition of the construction permit, the portion of the transmission line crossing North Bay will be required to have isolation valves at each end so that the pipe may be completely isolated in the event that it needs repair. The underwater portion of the line would be visually inspected by a diver twice per year and the line would be pressure tested before being placed into service. Additionally, pressure tests would be performed once a year. The construction permit also requires Lynn Haven to periodically inject dye into the proposed transmission line to check for any small leaks that may not otherwise be detected. Finally, the HDPE pipe would also be equipped so that television cameras could be inserted into the pipe to routinely inspect the interior of the pipe. In the event the HDPE portion of the transmission line would need to be repaired, the line could be immediately, temporarily repaired by a dresser coupling. A permanent repair could then be made in less than 24 hours once the material and equipment were staged at the site. The City intends to locally stockpile all necessary parts and equipment to effect any required repair to prevent any delay beyond four days. Permanent repairs would be accomplished by floating the line to the surface. The area needing repair would be cut out and a new section would be put in place by heat fusion. The line would then be pressure tested to insure the absence of leaks and placed back into service. During this process, the line would be taken out of service by the isolation valves and flow would be diverted to the eight million gallon holding ponds at the City of Lynn Haven's existing facility. These holding ponds can hold four days worth of wastewater from the City of Lynn Haven. Lynn Haven is required, as a condition of the construction permit, to have this reserve capacity as well as have a contractor on standby to make any repairs in the event such repairs are necessary. All of the technical specifications for the transmission system and the operating conditions imposed on it are designed to insure that the system does not fail or develop any leaks which could impact receiving waters, including North Bay. Given the permit conditions, the required inspections for leaks, the sound engineering design and quick repair methods proposed, the evidence demonstrated that the probability of any leak occurring in the portion of the transmission line crossing North Bay is extremely low and that if such a leak does occur any potential harm to the environment will likely be limited and quickly eliminated. The evidence demonstrated that the design of the transmission line and permit conditions provide reasonable assurances that the transmission line will meet or exceed the Department standards set forth in Chapter 17-604, Florida Administrative Code. Therefore, the applicant has provided reasonable assurances that the transmission line/collection system will not violate Department standards or rules and the applicant is entitled to a permit (permit #CS03-178910) for the proposed collection system. In addition to requiring a construction permit/collection system permit for the wastewater transmission line, the line will also require dredge and fill permits and a variance for crossing waters of the state. There are ten incidental crossings of state waters and one major crossing o f North Bay. Of the ten incidental crossings, two are over small creeks (Scurlock and Little Burnt Mill) These two incidental creek crossings will be accomplished by placing the transmission line (ductile iron pipe) on top of pilings placed in the water. Best management practices such as turbidity curtains and other erosion control practices are proposed and required by the permit to minimize construction impacts on water quality. The only impacts to wetland resources would be from the placement of the pilings. The evidence demonstrated that any impact would be minimal and not significant. The evidence did not demonstrate that the aerial crossings would have any long term water quality or environmental impacts. The remaining eight incidental crossings of waters of the state consist of small, seasonally wet ditches which would be traversed by trenching and burying the transmission line. Again, turbidity controls such as curtains and hay bales would be employed to protect water quality. The evidence did not demonstrate that any significant long term or short term impacts to resources of the state would occur. The evidence did demonstrate that the applicant has provided reasonable assurances that water quality standards would not be violated in regards to these 10 incidental water crossings. Likewise, the evidence demonstrated that the construction of these 10 incidental water crossings would not be contrary to the public interest. Therefore, the applicant is entitled to issuance of a dredge and fill permit (permit #031785181) for these 10 water crossing. However, a much harder question arises in relation to the dredge and fill permit and the variance required for the 3,000 foot segment of the wastewater transmission line which crosses North Bay. Pursuant to Rule 17- 312.080(7), Florida Administrative Code, permits for dredging and filling activity directly in Class II waters which are approved for shellfish harvesting by the Department of Natural Resources (DNR) shall not be issued. The reason for the rule is that any pollution caused by dredging and filling and, as in this case, the permanent placement of a sewage pipe in food producing waters could potentially have catastrophic effects on more than just the environment but on local employment in the shellfish industry and the quality of food available to the State. Put simply, the Department has determined by enacting its Rule that the public interest in food producing waters far outweighs any other consideration or criteria under Sections 403.918 and 403.919, Florida Statutes, in determining whether dredging and filling should take place in Class II, shellfish waters. In other words, it is not in the best interest of the public to allow dredging and filling so that a pipe carrying raw sewage can be placed in shellfishing waters. However, irrespective of this determination, the Department believes that, pursuant to Section 403.201(1)(c), Florida Statutes, it may grant a variance from its rules to relieve a hardship. As indicated earlier, North Bay is a Class II waterbody, conditionally approved for shellfishing. North Bay, therefore, falls within the Rule's prohibition against dredging and filling in Class II waters and the City is required to demonstrate the presence of a hardship in order to vary the Rule prohibition and obtain a dredge and fill permit for the North Bay crossing. On issues involving variances, the Department employs a two step analysis. The first part of the analysis is whether a hardship is present and the second is whether, if the variance were granted, would it result in permanent closure of Class II shellfish waters. The Department correctly recognizes that the question of whether a hardship exists is a question of fact and is determined on a case-by-case basis. Surprisingly, in a kind of "what we don't know can't hurt" posture the Department reviews a request for a variance standing alone based on the application as it is presented and does not require analyses of other possible alternatives to the granting of a variance. However, the existence of any alternatives, costs of any alternatives, timeliness of any alternatives, problems with any alternatives, whether an alternative represents a short term or long term solution to a given problem and the implementability of any of the alternatives are all factors utilized by the Department in determining whether or not to grant a variance. The Department's policy of non- review makes no sense, either factually or statutorily, when the Department is faced with varying a prohibition it created in its own rules. Similarly, the Department's policy of not requiring other alternatives to be examined before granting a variance goes against the fact that an applicant has the burden to establish entitlement to a permit and, in the case of a hardship variance, that a hardship exists because reasonable alternatives to granting a variance are not available. 4/ Likewise, the second part of the Department's hardship analysis relating to the permanent closure of shellfishing waters makes no sense given the fact that a non-permanent closure of shellfishing waters may have the same or just as serious effect on employment in the shellfishing industry, the loss of income due to an inability to earn a living in that industry and health risks posed by contaminated seafood. Temporary loss of income or a livelihood can, for all practical purposes, have consequences to the persons directly affected by a temporary closure of shellfishing waters similar in nature those caused by the permanent closure of shellfishing waters. The same can be said for health risks posed by a contaminated food supply. Rule 17-312.080(7), Florida Administrative Code, does not contain any exceptions for the temporary closure of shellfish waters. Nor is the rule limited to instances of permanent closure. Permanent closure is simpy not required in order to support a hardship under Section 403.201, Florida Statutes. Moreover, neither step in the Department's two-step analysis is included in any Rule promulgated by the Department. 5/ Without such a Rule, it is incumbent upon the Department or the applicant to demonstrate the underpinnings for this non-rule policy. No such evidence was presented at the hearing. In fact, the evidence presented at the hearing affirmatively demonstrated that the Department's non-rule policy violated both its own rules and the statute under which it is trying to proceed. As indicated, the issue of hardship is a question of fact and involves a weighing of all the facts and cicumstances involved in this project. In this case, there are shellfishing areas located close to the proposed location of the transmission line. North Bay is sometimes closed to shellfish harvesting by the Department of Natural Resources. These closures generally occur during wet weather conditions and are due to stormwater runoff and the failure of septic tanks in Southport. 6/ Additionally the current Lynn Haven system also contributes to the closure of North Bay. No competent, substantial evidence was provided that issuance of the permit and variance would result in the permanent closure of shellfish waters. The location of the proposed transmission line would be several hundred feet west of the Bailey Bridge embedded in the Bay floor. 7/ The proposed alignment of the transmission line through North Bay is in an area which is relatively biologically unproductive. The proposed placement of the transmission line avoids the few grassbeds that exist in the nearshore shallow areas except for approximately 200 square feet of grass. During construction of the line, these grasses would be removed immediately before the line is placed in a trench and then would be promptly replanted in the same area. The evidence demonstrated that the affected areas of grass should be able to reestablish itself. The evidence further demonstrated that there would not be any long term adverse impacts to these aquatic resources and there should not be any significant long term impacts on the balance of any aquatic life which may exist on the bay bottom. Water quality during construction will be protected by use of turbidity controls to control sediments. Therefore, any short term impacts on aquatic resources are likely to be insignificant. Concerns about long term adverse impacts to Class II waters are greatly reduced by the type of pipe and conditions in the permit which require that the transmission line be routinely inspected and tested to insure that there is no leakage and that in the unlikely event the line should need to be repaired, the line could be easily isolated and quickly repaired. The evidence showed that, to completely avoid Class II waters, the line could be moved several miles to the west or east of the line's proposed location or be placed over or under the Bay. If the line was moved west to the extent that it was in Class III waters, it would be over 40 miles long and would more than double the cost of the project. If the line was moved several miles to the east, it would go through the Deer Point Lake Watershed. The watershed is a Class I water supply for Bay County. Clearly, moving the line either west or east is not practical nor realistically feasible. Tunneling under North Bay would be very risky and is not technically feasible. The length of the tunnel would require steel pipe to be used. If tunneling could be done at all steel pipe would not provide the level of protection afforded by the HDPE pipe proposed by Lynn Haven. Placing the transmission line on pilings for an aerial route over North Bay is uneconomical and would create a potential hazard to navigation. Moreover, an aerial crossing would not solve any pollution problems should the transmission line leak or break and would also still involve a variance request since it would be necessary to dredge and fill in Class II waters for the placement of pilings or supports. Put simply, the evidence, showed that there was no realistic way to avoid Class II waters in North Bay given the location of the proposed wastewater treatment facility. A location which the City knew would require a hardship variance from the rule prohibition of dredging and filling in Class II, shellfishing waters. A hardship which the City created by site selection and which it hoped to overcome by strenuous permit conditions and futuristic speculative benefits to unsewered areas of the County. The existing treatment facility is operating in violation of both EPA and DER requirements, has been issued a notice of violation, is nonpermitted and is destined to be operating under a consent order. The system is hydraulically overloaded, handling approximately 1.2 million gallons per day while its rated capacity is 950,000 gallons per day. Refurbishing Lynn Haven's existing wastewater treatment facility would not be viable since the plant has outlived its useful life, is of a very poor design and probably could not be made to function within Departmental standards and water quality standards. The existing sprayfield does not function and results in overland flow of effluent which discharges to Class II waters. The high water table and presence of a semiconfining layer on the Lynn Haven peninsula virtually guarantee such discharges. Further, the plant only provides secondary treatment. Put simply, Lynn Haven needs another method of handling its sewage. The only remaining alternative to a Bay crossing is to tie into the existing Bay County system and any AWT wastewater treatment plant Bay County may build in the future. 8/ The existing Bay County system provides at most only secondary treatment. The Cherry Street facility, which is part of that system, functions essentially as a lift station rather than a treatment facility. The Military Point Lagoon portion of the system is nonpermitted and is operating under a consent order and has been the subject of enforcement action. The Department has an extensive agreement with Bay County requiring a significant and long term series of actions to deal with their wastewater treatment system. The modifications or improvements to the Bay County system to provide advanced treatment are not imminent and the final system conditions cannot now be determined as they will depend in large measure upon data and analysis remaining to be collected. Currently, the existing Bay County system processes a significant amount of industrial discharge and has a problem with phenols most likely due to industrial waste from two discreet industrial facilities in the County. 9/ However, all of Bay County's wastewater system problems are reasonably solvable and will be corrected in the near future, if they have not already been corrected. Additionally, the amount of sewage Lynn Haven would be sending into the current Bay County system probably would not significantly impact that system and its problems or the County's ability to solve those problems. The County is willing to accept Lynn Haven's sewage into its system and future AWT system. The connection into Bay County's system is a viable alternative currently in existence. Moreover, as indicated, Bay County has a long range plan to build an advanced wastewater treatment plant. As yet the plan remains "just a twinkle in the County's eye" and has not progressed to the design stage. However, this plan, of necessity, will eventually become reality in the next 5 to 10 years. The estimated cost to a Lynn Haven user for the Bay County conceptual system will be $25.00 per month in lieu of $15.00 for the proposed Lynn Haven system. These estimates are at best speculative. However, this cost estimate is not excessive given the fact that a Lynn Haven user lives in an environmentally sensitive area and a Bay County hook-up would eliminate the need to run a sewer pipe through food producing, Class II waters. 10/ Based on these facts, the evidence demonstrated that it was feasible for Lynn Haven to hook into Bay County's wastewater system without creating any more environmental impacts than that system is already experiencing and must solve and which, to a significant degree, have already been solved by Bay County. Given the existence of this alternative to crossing food producing waters and the fact that any future benefits are just as likely to be provided just as quickly by the County through AWT facilities, the applicant has failed to demonstrate the necessity for crossing North Bay and failed to demonstrate entitlement to a hardship variance for that crossing. Therefore, the applicant is not entitled to either a dredge and fill permit or variance for the proposed North Bay crossing.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is, recommended that the Florida Department of Environmental Regulation enter a final order issuing permit applications CS03178910, DC03178814, and 031785181, and denying the variance and permit number 031716641. RECOMMENDED this 27th day of November, 1991, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of November, 1991.
The Issue Whether the Petitioner's applications for (1) a general permit to operate a used oil refining facility and 2) an operation permit to operate an industrial waste water treatment system, at the same facility, in conjunction with the used oil refining operation, should be granted.
Findings Of Fact Sometime in the 1950's George Davis, the owner and operator of Davis Refining Corporation, became interested in used oil recycling and refining. From that time on, Mr. Davis worked towards his dream of operating a used oil recycling and refining center by gradually accumulating the land and equipment to operate such a facility. In order to further his goal, Mr. Davis acquired property located at 2606 Springhill Road in Tallahassee, Florida. Eventually, Mr. Davis applied for a permit to construct an industrial waste water treatment system in conjunction with a used oil refining facility on the Springhill Road property. On January 21, 1986, the Department issued a construction permit to the Petitioner to modify and construct an industrial waste water treatment system. The construction permit was subsequently extended on three different occasions. The last extension, granted May 30, 1989, extended the construction permit to its full statutory limit of five (5) years. The final expiration date of the construction permit was January 20, 1991. Petitioner was notified of the expiration date by the Department. During the time of the construction permit, Mr. Davis constructed an industrial waste water treatment system and an oil recycling and refining facility on his property on Springhill Road. Less than sixty days prior to expiration of the construction permit for the industrial waste water treatment system, the Petitioner submitted an application for renewal of an operation permit. The Department received the application on January 10, 1991. Unfortunately, the application for renewal of an operation permit was not the correct form since the Petitioner never had an operation permit. The application was rejected by the Department because it was the incorrect form and did not have the required permit fee. In March of 1991, after the expiration of Petitioner's industrial waste water treatment construction permit, Petitioner filed the correct application for an industrial waste water treatment operation permit and submitted the required fee. The industrial waste water operation permit application was denied by the Department because it was incomplete and lacked the required reasonable assurances that the system would not be a source of pollution in violation of water quality standards or contrary to the public interest. On October 29, 1990, Petitioner submitted a Used Oil Recycling Facility General Permit Notification to the Department. By letter dated November 28, 1992, the Department timely denied use of a general permit to operate a Used Oil Recycling Facility because the application lacked the requisite reasonable assurances that the proposed operation of the facility would not discharge, emit, or cause pollution so as to violate water quality standards or be contrary to the public interest. Even though the construction permit has expired and no additional permits have been issued by the Department the Petitioner continues to accept used oil and oily industrial waste water from outside sources for treatment. Currently, the facility consists of a used oil refining plant, industrial waste water treatment system, and separator (coalescer) system and water treatment pond. Munson Slough separates the facility into two parts. The used oil refining portion of the facility together with the industrial waste water treatment system input and separator (coalescer) system are located on the east side of Munson Slough. The refining portion of the facility is immediately adjacent to the slough. The industrial waste water treatment pond is located on the west side of Munson Slough. The industrial waste water treatment pond is likewise immediately adjacent to the slough. The industrial waste water treatment system is an integral part of the used oil recycling operation. Used oil and oily waste water are accepted from outside sources and are put through the separator system to separate the oil from the water and other contaminants. The separated oil is then re-refined at the refinery. The remaining industrial wastewater contains oily materials, solids, and volatiles. The separated water is pumped through a pipe underneath Munson Slough to the industrial waste water treatment pond. Additionally, the surface and stormwater runoff from the refining facility on the east side of Munson Slough also goes through the same industrial waste water treatment system and is pumped into the waste water treatment pond. Runoff from the refinery contains various pollutants as well as pollutants from any spills occurring at the refinery. Both the general permit for the refining facility and the operation permit for the industrial waste water treatment system depend on the ability of the waste water treatment system and pond to adequately handle the waste water and runoff water from the refining facility without permitting leaks of the wastewater into the environment. The industrial waste water treatment pond is lined with soil cement. Soil-cement is not a common material used in the construction of industrial waste water pond liners and the Department's personnel is not familiar with the material and its ability to function as an adequate liner for an industrial waste water pond. The soil-cement is a sand-cement mix (10 percent). The sand-cement was intended to be layered to a depth of six inches on the sides and bottom of the pond. The evidence showed that portions of the liner achieve a six inch depth. However, the evidence did not show that the soil-cement's depth is consistent throughout the liner since no as-built plans or certification for the facility were submitted to the Department and the engineer for the project at the time of its construction was not called to testify on whether the pond was constructed according to the construction plans. The sand cement liner overlays a high clay content pond bottom. The estimated (not established) permeability rate of the sand-cement pond liner is 1/100,000,000 centimeters per second and is within the Department's parameters for the adequacy of a lining material if that material is shown to actually have such a permeability rate by the time the operation permit is applied for. No materials data was submitted to the Department which demonstrated that the sand- cement liner of the pond actually achieved the permeability rate of 1/100,000,000 centimeters per second or the deterioration rate of such a liner. Likewise, no expert witness was called to establish such facts. The small amount of information given the Department on the sand-cement liner in Petitioner's application for its construction permit for the facility is inadequate to establish the actual performance of the sand-cement liner for purposes of the operation permit. Water from the industrial waste water treatment pond is discharged to the City of Tallahassee's waste water treatment system. The City of Tallahassee requires the industrial waste water treatment pond water to be tested for water quality prior to discharge to the City's waste water treatment system. The City requires that the waste water pond be aerated for approximately four (4) hours before discharge to the City waste water treatment system. One function of the aeration is to "blow off" the volatile contaminants from a used oil refining operation which might be present in the ponds water prior to aeration. However, the results of one water quality test indicated the presence of volatile substances and nonvolatile substances consistent with petroleum product contamination. Unfortunately, the results of only one water quality test were presented at the hearing. No conclusions either for or against the Petitioner can be drawn from the results of one testing period. Therefore, such test results cannot be used to affirmatively establish reasonable assurances that the pond is not leaking. In an unprecedented effort to aid the Petitioner in getting approval of his applications, the Department agreed to accept Petitioner's submittals and assertions regarding the integrity of the pond's liner as reasonable assurance if several soil borings and their subsequent analyses did not reveal any indication of contamination from the pond to soil or ground water. One soil boring was obtained by Dr. Nayak and six soil borings were obtained jointly by Dr. Nayak and the Department from locations around the industrial waste water treatment pond for chemical analysis. Unfortunately, chemical analysis of the soil borings revealed the presence of contaminants consistent with contamination parameters for waste oil recyclers. Therefore leakage or improper discharge from the pond could not be ruled out and it fell to the Petitioner to demonstrate that the contamination found in the soil was not the result of leaks or discharge from the pond. Petitioner points to the fact that the pond is supposedly setting on an impermeable layer of clay. However, it is not unusual for the geological features of a site such as the one upon which the treatment pond is located to vary within the limited site area. The different sites of the soil borings around the pond revealed that the substrata differed between the bore sites. The Department's geological expert testified that, based upon his observation at the site, including observing and participating in the taking of soil samples from the borings, that groundwater contamination was likely. In short, it is impossible to determine the geological composition of the entire site by the one soil boring taken by Dr. Nayak or even by the six borings performed jointly by the parties. Dr. Nayak's testimony that he is able to determine the geological features of the pond site with one boring is not credible nor is Dr. Nayak qualified to make such an assessment even if such were an acceptable scientific method for making such determinations. Therefore, the evidence failed to demonstrate that the waste water pond is sited over an impermeable layer of clay. Moreover, even if it were, then any contaminated water improperly discharging through the bottom layer of the pond would migrate along the top of the clay until it reached Munson Slough and still be a pollution problem for water quality purposes. The Petitioner has not, at any time prior to or during the hearing, obtained any environmental background of the site. Nor was any such information introduced at the hearing. The on-site observation of the taking of soil bores, visual inspection of the site, and the chemical analysis of the soil samples taken from the borings are consistent with petroleum contamination resulting from the industrial waste water pond. There are procedures and courses of action which the Petitioner can pursue to address the apparent contamination problems and to demonstrate the reasonable assurances necessary to qualify for the required Department permit to operate the used oil recycling facility. The Department has made many suggestions to the Petitioner as to various methodologies that the Petitioner might employ in order to endeavor to provide reasonable assurances that the waste water treatment pond does not leak. These suggestions include emptying the pond and examining the liner, performing a materials balance calculation, or performing more soil borings sampling and testing, together with assembling additional hydrological data. However, other than chemical analysis of the soil borings, the Petitioner has not opted to pursue any suggested procedure for obtaining the desired permit and did not submit sufficient competent, substantial evidence of any credible or scientifically reasonable alternative explanations for the presence of indicator chemicals in the soil borings. In short, The Petitioner has not submitted sufficient evidence nor provided any reasonable assurance that the operation of the used oil recycling facility will not discharge, emit or cause pollution. The Petitioner also has not provided reasonable assurance that the operation of the used oil recycling facility will not violate water quality standards or be contrary to the public interest. Similarly, there was insufficient evidence and no reasonable assurance submitted or offered by the Petitioner that the industrial waste water treatment system could be operated without violating water quality standards or being contrary to the public interest. Therefore Petitioner is not entitled to either a general permit for a used oil recycling facility or an operation permit for the industrial waste water treatment system used in conjunction with the used oil facility.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is accordingly, RECOMMENDED that a Final Order be entered denying the Petitioner both the general permit to operate a used oil recycling facility and the operation permit for the industrial waste water treatment system without prejudice to reapplying for such permits. DONE and ENTERED this 9th day of September, 1993, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of September, 1993. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-5140 and 92-1560 The facts contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 12, 13, 14, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 28, and 29 of Respondent's Proposed Findings of Fact are adopted in substance insofar as material. The facts contained in paragraphs 11, 15, 27 and 30 of Respondent's Proposed Findings of Fact are subordinate. The facts contained in paragraph 10 of Respondent's Proposed Findings of Fact were not shown by the evidence. Paragraphs 1 and 2 of the Petitioner's Proposed Findings of Fact were introductory and did not contain any factual matters. The facts contained in the 1st, 2nd and 7th sentences of paragraph 4 of Petitioner's Proposed Findings of Fact were not shown by the evidence. The remainder of the paragraph is subordinate. The facts contained in the 4th, 5th, 6th and 7th sentences of paragraph 5 of Petitioner's Proposed Findings of Fact are subordinate. The remainder of the paragraph was not shown by the evidence. The facts contained in paragraphs 3, 6, 7, 10, 12 and 13 of Petitioner's Proposed Findings of Fact were not shown by the evidence. The facts contained in the 3rd and 5th sentences of paragraph 8 of Petitioner's Proposed Findings of Fact were not shown by the evidence. The remainder of the paragraph is subordinate. The facts contained in the last sentence of paragraph 11 of Petitioner's Proposed Findings of Fact were not shown by the evidence. The remainder of the paragraph is subordinate. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Dr. S. K. Nayak 3512 Shirley Drive Tallahassee, Florida 32301 Candi Culbreath, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Findings Of Fact Fallschase is a special taxing district which was created by the Board of County Commissioners of Leon County, Florida, in Leon County Ordinance No. 75-6. The district contains approximately 620 acres and is located in the area of the intersection of U.S. Highway 90 and Buck Lake Road in Leon County, Florida. The Intervenors are corporations which are seeking to develop the Fallschase area into a residential community. Through its permit application, Fallschase is seeking authority to construct a 167,000 gallon per day sewage treatment plant which would serve the proposed development. The plant would be of the extended aeration type with tertiary filters. Effluent from the plant would be discharged into a Percolation pond system. The City of Tallahassee operates a sanitary sewer system which serves areas within the city limits, as well as many unincorporated areas of Leon County. Service is provided to the unincorporated areas of the county in accordance with a contract between the City and Leon County which was executed in 1973. No election has been conducted within Leon County to authorize the contract. The County has terminated the contract, but the termination will not be effective until November 12, 1980. The City's sanitary sewer system is a regional system in that it serves a broad area not limited by the political boundaries of the City. The City's system has operated under temporary permits issued by the Department for a number of years because it does not meet the Department's requirements for tertiary sewage treatment. The City's regional sewage treatment system is capable of providing service to Fallschase. A 10-inch sewage pipe known as the "Belle Meade" Line runs adjacent to Fallschase. If a pumping station were constructed, sewage from Fallschase could be pumped into the Belle Meade Line and eventually into the City's primary sewage lines for treatment at one of the City's treatment facilities. In accordance with its statutory responsibilities, the Department has adopted Rule 17-4.26, Florida Administrative Code, which relates to permit requirements for sewage works. As filed with the office of the Secretary of State, the rule provided as follows: No person shall operate, maintain, construct, alter, modify, or expand any sewage collection system, sewage disposal system or sewage treatment facilities without a current and valid permit from the Department, pursuant to the Provision of Chapter 17-6, Florida Administrative Code. The Department shall deny an appli- cation for a permit and refuse to issue a permit unless the sewage collection, treatment and disposal system will pro- vide adequate and effective treatment in accordance with the rules and regu- lations of the Department and unless the system will operate as part of a regional system if one exists or be capable of tying into a regional system should one be established. Applications for a permit under this section shall be in accordance with Part I, Chapter 17-4, Florida Administrative Code. (e.s.) As filed with the Secretary of State, the rule included a clear policy choice in favor of regionalization of sewage treatment systems. In accordance with its responsibilities, the office of the Secretary of State published the rule in the Florida Administrative Code. When the rule was published in the Code, the portion of the rule which is underlined in the above quote was omitted. The rule as published in the Code thus did not include a clear statement requiring regionalization, and does not make sense. This erroneous version of the rule has been published in the Florida Administrative Code for more than five years, and the error has been compounded in that the Department has utilized the Florida Administrative Code version of the rule in its official handouts. A citizen requesting a current copy of Rule 17-4.26 from the Department, or from the Secretary of State's office, would receive the erroneous rule. The error has been further compounded because the Department subsequently adopted a policy of evaluating applications for sewage treatment proposals without regard to whether hookups to a regional system were possible. This policy has been applied by the Department for at least three years in accordance with verbal and written instructions of the Department's then Secretary, Jay Landers. Additional language was later added to Rule 17-4.26 as follows: Except for regional treatment plants, as designated by approved metropolitan or basin plans, all permits for treat- ment plants shall be valid only until connection, according to an approved plan, can be made to regional facilities. Such connection shall be made within ninety (90) days of the scheduled date for connection as provided in the approved plan. This provision has no applicability to the City's treatment system because the City's system has never been approved as the metropolitan or basin clan by the Department. The City has contended that the sewage treatment plant proposed by Fallschase would result in violations of the Department's standards for nitrates in the groundwater in the area of the plant. Nitrates would be a constituent of the effluent which would be discharged from the proposed sewage treatment plant into percolation ponds. The engineer who has designed the proposed plant estimated that total nitrogen discharged into the percolation ponds would be approximately 20 milligrams per liter, or parts per million (p.p.m.). In extended aeration plants such as that proposed by Fallschase, a substantial portion of the nitrogen would be in the form of nitrates. The 20 p.p.m. estimate is high. The experience generally in north Florida has been that nitrogen concentrations would not exceed 10 p.p.m. in the effluent discharged into percolation ponds. Once the effluent is discharged into the ponds, a certain amount of nitrogen is removed during the settling process. As the effluent percolates through the subsoils into the groundwater, further nitrogen is removed. Estimates of nitrogen removal through these processes range from a low of 25 percent to a high of 75 percent. The groundwater below the proposed plant is classified as Class 1-B groundwater under the Department's rules. It is very unlikely that effluent reaching the groundwater would contain as much as 10 p.p.m. nitrates. Even if it did, mixing with the groundwater would cause an almost immediate dilution of nitrogen concentrations so that concentrations in the groundwater as high as 10 p.p.m. would be unlikely in the extreme. Many sewage treatment plants operate within the Department's northwestern region, which extends from Pensacola to Tallahassee. The Department monitors these plants. A violation of the Department's nitrate standards has never been observed in the region. Indeed, in the entire State of Florida, nitrate violations have been detected only in certain areas of Dade County. Testimony was presented by the City to the effect that chemical processes in percolation ponds can cause very drastic nitrate concentrations when the funds are intermittently flooded and drained. Such concentrations have been observed at one of the City's treatment plants. The City`s plant, however, is of a different sort than that proposed by Fallschase. The City's plant produces concentrations of nitrogen in ammonia compounds and utilizes intermittent drying and flooding of the percolation ponds as a part of its operation. Ammonia compounds will not be a major constituent of effluent placed in the Fallschase percolation ponds; and, furthermore, the ponds will not be intermittently flooded and drained in the manner that would cause such concentrations to develop. In its Notice of Intent to Issue the proposed permit, the Department indicated that sludge produced through the proposed treatment facility should be disposed of by hauling to a plant operated by the City. The City has indicated that it will not make its plant available for such disposal, and cotends that accordingly Fallschase has given no reasonable assurances that the sludge will be disposed of properly. The contention is without merit. Many alternatives exist for disposal of sludge. Fallschase has adequate area available to it for construction of sludge drying pits. Sludge can be hauled to many potential locations. Specific issues respecting sludge disposal can be addressed in the operating permit which would not be issued by the Department until it is established that the proposed plant can operate within the Department's rules and regulations. The soils which lie below the proposed percolation ponds are not of a highly permeable sort. To aid in the percolation of effluent through the ground into the groundwater, Fallschase proposes to construct two-foot diameter holes in the bottom of the percolation ponds. The holes would extend from 18 to 25 feet below the bottom of the percolation ponds. The holes would be filled with sand, and alternatingly coarse layers of gravel. The City has contended that these holes would constitute wells, and that they therefore would need to be permitted by the Department. This contention is without merit. These structures could fit loosely within the definition of a well, but their function is merely to aid in the percolation of effluent through the subsoils. They are not designed to inject effluent directly into the groundwater. These structures would constitute wells to the same extent that any drain field would constitute a well.
The Issue Whether Respondent Sarasota County Public Utilities Department (Sarasota County) has provided reasonable assurances pursuant to Rule 17- 555.530(1)(a), Florida Administrative Code, that its proposed water treatment plant will comply with each applicable water quality standard contained in Part III, Chapter 17-550, Florida Administrative Code. Whether Respondent Sarasota County has provided reasonable assurance pursuant to Rule 17-555.530(1)(b), Florida Administrative Code, that its proposed water treatment plant meets adequate engineering design complying with the applicable engineering principles established in Rules 17-555.310 through 17-555.160, Florida Administrative Code.
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: STIPULATED FACTS Sarasota County Utilities Department is a department established by Sarasota County, a political subdivision of the State of Florida and operates a public utility department which is charged with meeting, among other things, potable water needs of the residents of Sarasota County. At all times pertinent to the issues herein, HRS was responsible for receiving applications and issuing permits for the construction of water treatment plants and the accompanying well field. Petitioner, Charles P. Page, is a resident of Sarasota County and resides at 259 Glen Oak Road, Venice, Florida. Sarasota County filed an Application for a Water Treatment Plant Construction Permit with HRS seeking to construct a well water collection system and a 12 mgd - electrodialysis treatment plant having an auxiliary power system to provide power for the well field and water treatment plant. Sarasota County has previously obtained a water use permit from the Southwest Florida Water Management District (SWFWMD) #208836.00, restricting Sarasota County to feed water for the water treatment plant to 7,303,000.00 gallons average daily withdrawal and 9,625,000.00 gallons peak monthly withdrawal. Sarasota County has received permits for the eleven (11) production wells from HRS. It was the duty of HRS to review the plans and specifications and all supporting documentation to assure that they address and meet every requirement listed in Rule 17-555, Florida Administrative Code, for the issuance of a construction permit.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, accordingly, RECOMMENDED: That a final order be entered issuing permit No. PATS No. 204307 & WC No. 1591-91-036 to Respondent Sarasota County, as set forth in the Notice of Intent To Issue dated February 20, 1992, provided that the grant of the subject permit shall include the general and specific conditions in the Intent To Issue with the further recommendation that the third required specific condition found on page 1 of the Specific Conditions be modified as follows: Construction of the electrodialysis reversal water treatment plant covered by this permit shall not begin prior to the issuance of a permit as required by State of Florida Department of Environmental Regulation for the EDR concentrate discharge facility. DONE and ENTERED this 21st day of October, 1992, at Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of October, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 92-2002 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statute, on all of the Proposed Findings of Fact submitted by the parties in this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner 1. The following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1(1); 22(47); 23(48); 24(19-20) 29(49); 38(5); 39(19); 42-43(19,20); and 51(49). 2. Proposed finding(s) of fact 2,3,5,6,7,11,14,15,16,18, 19,20,21,25,26,30,31,35,40,45,46,47,49,and 50 are neither material nor relevant to this proceeding or the conclusion reached in the Recommended Order. Proposed finding(s) of fact 4,8,9,10,12,13,17,27,28,and 41 are rejected as not being supported by competent substantial evidence in the record. Proposed finding(s) of fact 32,33,34,36,37, and 48 are unnecessary. Proposed finding of fact 44 is rejected as not being the "opinion" of the Hearing Officer. The transcript will show that the Hearing Officer was only restating the testimony of Judith Richtar. But see Finding of Fact 49. Rulings on Proposed Findings of Fact Submitted by the Respondent Sarasota County The following proposed findings of fact are adopted in substance as modified if the Recommended Order. The number in parenthesis is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1 - 20(1) - 20, respectively); 21(27); 22 - 26(22 - 26, respectively); 27(28); 28(29); 29(31); and 30 - 44(32 - 46, respectively). For proposed findings of fact 45 through 65 see Findings of Fact 51 and 52. Proposed findings of fact 66 through 68 are unnecessary. Rulings on Proposed Findings of Fact Submitted by the Respondent Department of Environmental Regulation The Respondent Department of Environmental Regulation adopted Sarasota County's proposed findings of fact 1 through 44, 63 and 64, and 66 with modification. Therefore, the rulings on the Department's proposed findings of fact would be the same as the previous rulings on Sarasota County's proposed findings of fact adopted by the Department. COPIES FURNISHED: Bruce Wheeler Pitzer, Esquire 546 47th Street Sarasota, FL 34234 William A. Dooley, Esquire Nelson, Hesse, Cyril, et al. 2070 Ringling Blvd. Sarasota, FL 33237 Joseph W. Landers, Esquire Landers & Parsons 310 W. College Avenue, 3rd Floor Tallahassee, FL 32301 W. Douglas Beason, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Carol Browner, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400
Findings Of Fact Respondent HDR has applied to DER for a permit to construct a 60,000 gallon per day extended aeration sewage treatment plant with percolation ponds. The facility would be used to provide secondary treatment of domestic waste from the HDR Mobile Home Park. The project is in Volusia County south of the City of Oak Hill and north of the Town of Edgewater. It is bounded on the east side by the Indian River and the west side by U.S. Highway One. The mobile home project site consists of approximately 156 acres, with the proposed wastewater treatment plant located in the southwest corner of the tract. HDR submitted Application No. 85433 to DER on July 2, 1984, requesting a permit to construct a 0.6 MGD extended aeration sewage treatment plant and associated percolation ponds for the mobile home project. Supplemental information was filed with DER on August 29, 1984. DER issued a notice of intent to permit the project on November 8, 1984. The plant would provide secondary treatment of effluent with a minimum of 90 percent removal of BOD's and suspended solids through aeration, settling and chlorination processes. The system is designed to collect sewage through a gravity system and lift station. The lift station dumps the sewage into the aeration chambers where forced air is mixed with the sewage, resulting in removal of organic materials and solids. The dissolved solids are then separated in the settling tank. From the settling tank, clear effluent enters the chlorine contact chamber where chlorine disinfectant is added prior to discharge into the percolation pond. The method of treatment described above and the design of the plant are standard. If the plant is operated properly, the wastewater will meet all DER criteria for secondary sewage treatment. Plant odor will be minimized by the continual feed of forced air into the system. Silencers will be installed on blowers to minimize any adverse noise effects from the blowers' operation. Aerosol drift is not a factor with the design of this plant. Security lighting will be provided, and the plant site will be surrounded by a six foot security fence. The design provides for effluent sampling access points and there will be a flow meter for measuring effluent discharge on site. A Class C operator will be required to operate the plant. Disposal of the 90 percent treated effluent will be made into two percolation ponds. The ponds will be alternately loaded, with one pond being loaded for seven days and then resting seven days. The total surface area for the two ponds is approximately 130,000 square feet. The ponds are designed with berms of three feet with an emergency overflow one foot from the top of each berm. The two ponds together are designed to handle 200,000 gallons per day which would be the ultimate build out of this project. However, the maximum capacity of the initial phase of the wastewater treatment plant would be 60,000 gallons a day. Any expansion to the sewage treatment plant would require a separate permit. The overall elevation of the area where the ponds are to be located is approximately 14 feet above sea level. Each pond is designed so that the pond bottom is two feet above the underground water table level measured at the highest point for the rainy season. In a 100 year flood, it is expected that the effluent and water can be absorbed without an overflow. The mobile home park has a storm retention system in which any theoretical overflow would be caught. The soil type at the location of the percolation ponds consists of several layers of sands. This type of soil has good permeability in that it provides a good transfer of water through the soil and is therefore suitable for siting of the percolation ponds. Pond design is conservative in that the hydraulic loading rate has a safety factor of at least 300 percent. Once the effluent has percolated into the ponds, the discharge will meet or exceed the level of quality of the G-2 ground water within the 100 foot zone of discharge. The design of the wastewater treatment plant also includes sufficient monitoring wells and provides for adequate buffer zones from residences and drainage ditches. No surface waters of the state are located within 500 feet of the sewage treatment plant or its percolation ponds. The Indian River, which is adjacent to the Hacienda Del Rio project, is approximately 2,500 feet from the sewage treatment plant. There will be no direct discharge by the sewage treatment plant into this body of water or any surface waters, nor would any indirect effect on surface waters be measurable. Shellfish harvesting is a local industry. The waters of the Indian River immediately east of the Hacienda Del Rio property are designated Class II waters suitable for shellfish harvesting. The Indian River is also part of the Canaveral National Seashore Waters, which are designated as Outstanding Florida Waters. Concern was expressed that additional growth in the area might contribute to degradation of these Class II waters. There was, however, no evidence to indicate that the construction or implementation of the wastewater treatment plant by HCD would degrade ore pollute the Indian River (which is both Class II and Outstanding Florida Water) or any other State of Florida surface waters. It should be noted that waters north and south of the property in the Indian River are closed to shellfish harvesting, apparently due to pollution. The Town of Edgewater north of the Hacienda Del Rio project has a secondary wastewater treatment plant which discharges its effluent directly into the Indian River. The City of Oak Hill to the south of the project has no wastewater treatment plant whatsoever. Individual businesses and homes utilize septic tanks, which can cause pollution to the Indian River through seepage. The HDR sewage treatment plant would thus meet higher standards than neighboring community facilities.
Recommendation From the foregoing, it is RECOMMENDED that the Department of Environmental Regulation issue a Final Order granting the application of Hacienda Del Rio. DONE and ENTERED this 31st day of May, 1985, in Tallahassee, Florida. R. T. CARPENTER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of May, 1985. COPIES FURNISHED: Betty J. Steffens, Esquire NABORS, GIBLIN & STEFFENS, P.A. 102 South Monroe Street Tallahassee, Florida 32302 William C. Henderson, Esquire HENDERSON & HENDERSON, P.A. Post Office Box 1840 New Smyrna Beach, Florida 32070 B. J. Owens, Esquire Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32301 Alva Stewart, Vice President South Waterfront Park Homeowners Association 150 Charles Street Edgewater, Florida 32032 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blairstone Road Tallahassee, Florida 32301
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: Several years prior to1978, petitioner General Development Corporation (GDC) applied to the DER for a dredge and fill permit to remove a plug of land between the Ocean Breeze Waterway and the North Fork of the St. Lucie River. During the course of negotiations for this permit, it was discovered that the North Port St. Lucie Sewage Treatment Plant, owned and operated by General Development Utilities, Inc., a wholly-owned subsidiary of the petitioner, was operating without a permit from the DER and discharging effluent into a ditch which flowed into the Ocean Breeze Waterway. In March of 1978, a temporary operating permit was issued for the sewage treatment plant. In July of 1978, petitioner received from the DER Permit No. 253.123- 1031 to dredge an area approximately 800 feet in length, 90 feet in width and 6 feet in depth in order to connect the Ocean Breeze/Sagamore Waterways to the dead end oxbow of the North Fork of the St. Lucie River. The permit application was given special consideration pursuant to Rule 17-4.28(7), Florida Administrative Code. The purpose for obtaining the permit was to create direct navigable access to the North Fork of the St. Lucie River from thee Ocean Breeze Waterway. The Ocean Breeze Waterway was and is currently connected to the North Fork of the St. Lucie River by a narrow, shallow, meandering creek and lake system. However, there is not a large enough opening to allow the type of navigable access desired by the petitioner for the benefit of 118 lots plotted along the Ocean Breeze and Sagamore Waterways. Among the seven particular or special conditions attached to the dredge and fill permit issued to petitioner was that the earthen plug not be removed until such time as a permanent operational permit was issued for the sewage treatment plant owned and operated by General Development Utilities, Inc. More specifically, petitioner agreed to the following special conditions to the issuance of the dredge and fill permit: "(7) The applicant is aware that the GDC Utilities' sewage plant is providing an unknown quantity of discharge into Ocean Breeze Waterway and that this discharge may be a source of pollution to the receiving body of water unless affirmative steps are taken by the Utilities. The sewage treatment plant is currently operating under a Temporary Operating Permit (TP56-4601). In no case shall the plug at Cove Waterway be removed before an Operation Permit for the STP has been issued by the Department of Environmental Regulation." At time of issuance of the dredge and fill permit, DER personnel considered the quoted special condition number 7 to an integral part of the permit in terms of water quality assurances. General Development Utilities, Inc. has not been able to obtain a permanent operational permit from the DER for its sewage treatment plant which discharges into a ditch that flows into the Ocean Breeze Waterway. Therefore, particular condition number 7 has not been satisfied and petitioner has been unable to proceed with the dredging or removing of the plug under the permit. As a result of the delays in removal of the plug, petitioner has had to repurchase some 41 of the 118 plotted lots. The sewage treatment plant was and is still operating under a temporary permit. General Development Utilities, Inc. has requested a permanent operational permit for the sewage treatment plant and DER has issued a letter of intent to deny such a permit. As a result, General Development Utilities has petitioned DER for site specific alternative criteria pursuant to Rule 17-3.031, Florida Administrative Code. This matter is the subject of a separate proceeding currently being held in abeyance pending a determination of alternative criteria. General Development Utilities, Inc. v. Department of Environmental Regulation, DOAH Case No. 81-177. In September of 1980, petitioner sent a letter to DER requesting that special condition number seven be removed from its dredge and fill Permit No. 253.123-1031. It was intended that this request be considered as a minor modification to the dredge and fill permit. In response, DER's Chief of the Bureau of Permitting, Suzanne P. Walker, informed petitioner by letter dated October 15, 1980, that it was the staff's initial reaction, after a review of the original dredge and fill permit file, that the requirement that the sewage treatment plant obtain a permanent operational permit prior to dredging remain as a condition of the dredge and fill permit. Petitioner was informed that if it wished to pursue the matter further, the project must be reevaluated as a major modification to the dredge and fill permit. A major modification to a permit requires a new permit application and fee and is treated and processed as an initial application for a permit, with the applicant being required to provide reasonable assurances that the water quality standards will not be violated. Upon request for a minor modification, DER simply reviews the file and determines whether the request is obviously environmentally insignificant. After receipt of the letter from Mrs. Walker, petitioner supplied DER with additional water quality data. Based upon this additional data, discussions with DER staff who had been involved with the initial dredge and fill permit and the sewage treatment plant permit, and two days of sampling data collected by DER, DER determined that particular condition number seven was an integral part of the affirmative reasonable water quality assurance provided and should remain a condition of the permit. This determination was communicated to petitioner by letter dated January 7, 1981. The sewage treatment plant discharges treated effluent into a drainage ditch known as C-108. Effluent from the plant first goes into holding or retention ponds. Under its current flow, it takes about forty days for the effluent to be discharged from the plant to C-108 and the Ocean Breeze Waterway. C-108 flows into the Ocean Breeze Waterway, an artificial waterway which is presently connected to the North Fork of the St. Lucie River by a narrow, shallow meandering creek and lake system. The sewage treatment plant currently operates at 300,000 gallons per day but has an authorized capacity to operate at two million gallons per day. It currently contributes approximately two percent of the total daily flow to C-108. The Ocean Breeze Waterway and C-108, independent of the sewage treatment plant, drain approximately 4,000 square acres and produce about 35 percent of the water that will flow into the North Fork. The North Fork is tidal, with four one foot tides per day. The tidal action comprises almost 63 percent of the moving water. At a two million gallons per day discharge, the wastewater plant would be contributing about 12 percent of the water that would be going into the North Fork from the Ocean Breeze Waterway system. In comparison with two adjacent drainage systems, the Ocean Breeze system contributes only about three percent of the fresh water which flows into the North Fork. The dissolved oxygen levels of C-108 are chacteristically below the state standard of five milligrams per liter, primarily due to the seepage of ground water into the canal. Due to man-made alterations and to natural phenomena, the North Fork's dissolved oxygen levels also characteristically fall below state standards. The dissolved oxygen level of the Ocean Breeze Waterway is characteristically above state standards. Higher levels of dissolved oxygen coming from the sewage treatment plant improves the dissolved oxygen levels of the existing system. High levels of nitrogen, phosphate and chlorophyll have been found near the point of discharge. The quality of water in the North Fork is better than in the Ocean Breeze Waterway. It was the opinion of petitioner's experts that no change in dissolved oxygen levels would occur in the Ocean Breeze Waterway or the North Fork if the plug of land between these water bodies were removed. Petitioner's witnesses also opined that the Ocean Breeze/C-108 system was not a source of nutrient enrichment to the North Fork, and that the present creek system provided no water quality benefits in the form of nutrient uptake for the North Fork. It was estimated that, if the plug of land were removed pursuant to the permit, a pollutant placed at the upper end of the Ocean Breeze Waterway would be diluted by 98 percent in 26 hours in lieu of the present 39 hours due to increased flushing. These opinions were based upon analyses by petitioner's witnesses of various samplings and data regarding dissolved oxygen, nutrients and phytoplankton. The respondent's witnesses felt that the poor water quality in the Ocean Breeze Waterway was attributable in large part to the sewage treatment plant discharge and, if the plug of land were removed, the water quality problems would be moved to the North Fork and the St. Lucie River. It was felt that the present creek and lake system -- the narrow circuitous connection presently existing between the canal and the river -- reduces the nutrients which otherwise would flow into the river. These conclusions were based upon DER's own survey, a review of the dredge and fill permit file and a review of the additional data supplied by the petitioner General Development Corporation. No data regarding the water quality of the effluent from the sewage treatment plant was submitted by the petitioner at the time of DER's review of the original application for the dredge and fill permit.
Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that the request of General Development Corporation to modify Permit Number 253.123-1031 by removing particular condition number seven be DENIED. Respectfully submitted and entered this 14th day of October, 1981, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of October, 1981. COPIES FURNISHED: Valerie Fravel Corporate Counsel General Development Corp. 1111 South Bayshore Drive Miami Florida 33131 Alfred J. Malefatto Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Honorable Victoria Tschinkel Secretary, Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301
The Issue Whether Permit No. DO19-101251 issued to Mr. Vail on July 11, 1985 to construct and operate an on-site wastewater treatment and disposal system should be revoked?
Findings Of Fact Mr. Vail is the owner and operator of a business called the St. George Inn and Restaurant (hereinafter referred to as the "Inn"). The Inn is located at the southeast corner of the intersection of Franklin Boulevard and Pine Avenue on St. George Island, Florida. In May of 1984 Mr. Vail spoke with an employee of the Department of Health and Rehabilitative Services about obtaining a permit to construct a septic tank on his property for use by the Inn for the treatment and disposal of wastewater. Mr. Vail was instructed to submit a design of the septic tank for approval. Mr. Vail contracted with McNeill Septic Tank Company for the design and construction of the septic tank. The evidence failed to prove when Mr. Vail applied with the Department of Health and Rehabilitative Services for a permit. As of March, 1985, however, Mr. Vail had not received approval or disapproval of his application from the Department of Health and Rehabilitative Services. Mr. Vail, therefore, went to the Governor's office to seek help in getting a response. Shortly after contacting the Governor's office, the Department of Health and Rehabilitative Services informed Mr. Vail that he needed to obtain a permit from the Department and not from the Department of Health and Rehabilitative Services. On or about March 18, 1985, Mr. Vail filed an Application to Operate/Construct Industrial Wastewater Treatment and Disposal Systems (hereinafter referred to as the "Application"), with the Department. The Application was prepared by Brown and Associates Civil Engineers and Land Surveyors, Inc., Mr. Vail's engineering consultant. The Application was certified by Benjamin E. Brown, Professional Engineer. Mr. Vail signed the Application as "owner" and indicated that he was aware of the contents of the Application. In the Application, "St. George Inn Restaurant" is listed as the "Source Name." Under Part II, A of the Application, the applicant is asked to "[d]escribe the nature and extent of the project." In response to this request, the following answer was given: This project will provide a sewage disposal system for a one hundred and fifty (150) seat restaurant on St. George Island. Sizing of the septic tank system is based on 50 GPD/seat and secondary treatment will be provided by the design proposed. Under Part III, A of the Application, the applicant is asked to provide the following information and the following answers were given: Type of Industry Restaurant . . . . 3. Raw Materials and Chemicals Used Food preparation only. Normal Operation 12 hrs/day 7 days/week . . . . If operation is seasonal, explain This restaurant will be used the most during the summer months which corresponds with ocean/beach recreation & the tourist trade. Nowhere in the Application is it indicated that the permit applied for involved anything other than a restaurant. The Application gives no information from which the Department could have known that the proposed wastewater treatment and disposal system would handle waste from guest rooms or an apartment. In the Application Mr. Vail sought approval of a permit to construct and operate a wastewater treatment and disposal system to serve a 150 seat restaurant. In the Application Mr. Vail sought a permit for a system which was to have a design flow of 7,500 gallons per day based on 50 gallons, per seat, per day water usage. An employee of the Department wrote a memorandum dated May 5, 1985, recommending approval of the Application. The Department determined, however, that the size of the property on which the Inn was to be located was not large enough for the drain field necessary to accommodate a 150 seat restaurant. Therefore, Mr. Brown modified the proposed system and resubmitted application data indicating that a 108 seat restaurant would be constructed. The design flow of the new proposal was 2,160 gallons per day based on 20 gallons per seat per day. Mr. Brown had requested that the Department approve a system based upon the newly submitted design flow. The Department and Mr. Brown both agreed that this design flow was adequate; that it was reasonable to anticipate and provide for the treatment and disposal of a maximum of 2,160 gallons per day design flow. The effect of reducing the design flow and the number of seats was to allow a shortened drain field which could be accommodated by the size of the property the Inn was to be located on. On June 27, 1985, Mr. Vail arranged for a notice to be published in the Apalachicola Times. That notice provided, in pertinent part, the following: State of Florida Department of Environmental Regulation Notice of Proposed Agency Action on Permit Application The department gives notice of its intent to issue a permit to Jack Vail to construct a restaurant and on-site wastewater treatment and disposal system [sic] at Franklin Boulevard and Pine Avenue, St. George Island. The treatment consists of grease trap, septic tank, and sand filter followed by disposal into a drainfield. The project meets applicable standards and will not impair the designated use of the underlying ground water. There is no anticipated impact on surface waters or air quality. . . . . This notice was sent to Mr. Vail by the Department and he made arrangements for it to be published. Nowhere in the notice is it indicated that the system to be approved by the Department is for anything other than a restaurant. On July 11, 1985, less than four months after the Application was filed with the Department, the Department issued Permit Number DO19-101251 (hereinafter referred to as the "Permit"). In the cover letter sent with the Permit the Department indicated that the Permit allowed Mr. Vail "to construct and operate a 2,160 gallon per day, on-site wastewater treatment and disposal system serving St. George Inn Restaurant. . . ." The Department also indicates in the Permit that it is for the "St. George Inn Restaurant." The Permit also provides, in pertinent part, the following with regard to the purpose of the Permit: The above named applicant, hereinafter called Permittee, is hereby authorized to perform the work or operate the facility shown on the application and approved drawing(s), plans, and other documents attached hereto or on file with the department and made a part hereof and specifically described as follows: Construct and operate a 108 seat restaurant with an on-site wastewater treatment and disposal system. Wastewater flows shall be a maximum of 2,160 gallons per day generated by domestic facilities and kitchen wastes . . . Construction shall be in accordance with application dated March 18, 1985 and additional information submitted April 29, 1985, specifications and other supporting documents prepared by Brown and Associates and certified by Benjamin E. Brown, P.E. and submitted to the Department on June 5, June 17, and June 20, 1985. The Permit also contains the following "General Condition" number 2 and "Specific Condition" number 15: . . . . 2. This permit is valid only for the specific processes and operations applied for and indicated in the approved drawings and exhibits. Any unauthorized deviation from the approved drawings, exhibits, specifications, or conditions of this permit may constitute grounds for revocation and enforcement action by the department. . . . . 15. The Department shall be notified and prior approval shall be obtained of any changes or revisions made during construction. . . . . The Permit provides the following with regard to the effect of the conditions of the Permit: The terms, conditions, requirements, limitations, and restrictions set forth herein are "Permit Conditions", and as such are binding upon the permittee and enforceable pursuant to the authority of sections 403.161, 403.727, or 403.859 through 403.861, Florida Statutes. The permittee is hereby placed on notice that the Department will review this permit periodically and may initiate enforcement action for any violation of the "Permit Conditions" by the permittee . . . . During the week after the Permit was issued, Mr. Vail obtained a building permit from Franklin County for the construction of the "inn." In February, 1986, after construction of the Inn had begun, Department inspectors went to the construction site of the Inn. The Permit authorized this inspection and other inspections carried out by the Department. The Department determined that the Inn being constructed by Mr. Vail included a restaurant, an apartment on the third floor of the Inn with two bathrooms, and eight guest rooms on the second floor, each containing a bathroom. This was the first time that the Department knew that Mr. Vail's facility was to include guest rooms and living quarters in addition to containing a 108 seat restaurant. In March of 1986, the Department sent a warning letter to Mr. Vail notifying him of the violation of the General Conditions of his Permit: the use of the approved system for the treatment and disposal of wastewater from the ten bathrooms in the guest rooms and the two bathrooms in the apartment in addition to the 108 seat restaurant. On April 1, 1986, Department personnel met with Mr. Vail and Mr. Brown. The Department reminded Mr. Vail and Mr. Brown that the Permit requested and approved by the Department was for a 108 seat restaurant only. The Department had not authorized a system which was to be used for a 108 seat restaurant and ten additional bathrooms. Pursuant to General Condition 14, the Department informed Mr. Vail that it needed an engineer's evaluation of the ability of the system which had been approved to handle the additional flow which could be expected from the additional ten bathrooms. By letter dated April 1, 1986, the Department memorialized the meeting and indicated that Mr. Vail could operate a 100 seat restaurant and the apartment during the interim. By letter dated May 8, 1986, Mr. Brown asked for additional time to submit the evaluation requested by the Department. The Department approved this request by letter dated May 14, 1986. By letter dated May 16, 1986, Mr. Brown submitted an engineering evaluation which proposed modifications to the approved system to handle the additional ten bathrooms. By letter dated June 13, 1986, the Department indicated that the evaluation was generally acceptable" but requested additional information. In January, 1987, before the additional information was submitted, Mr. Brown died in an airplane accident. No evidence was presented to explain why the information requested by the Department in June of 1986 had not been submitted before January, 1987. In March, 1987, the Department inspected Mr. Vail's facility again. In April, 1987, the Department informed Mr. Vail that the Department would take action to revoke the Permit. Before the Administrative Complaint was issued, the Department requested that certain information be provided on behalf of Mr. Vail by an engineer in an effort to resolve the dispute. Mr. Vail did not, however, obtain the services of an engineer. Instead, Mr. Vail sent the Department information purporting to show the amount of water which had been used at the Inn. That information failed to prove the ability of the system that the Department had approved to handle the maximum wastewater which could be expected from maximum use of the 108 seat restaurant and ten additional bathrooms. At best, the information submitted by Mr. Vail is partial proof that the system is capable of handling the wastewater that has been generated at the Inn for the period of time for which the information relates. No competent substantial proof has been submitted to indicate that the system is capable of handling the maximum wastewater flows which may be experienced or even that the system is adequately handling the current flow. All that has been proved is that there is no apparent problem with the system in handling the current flow. In September, 1987, the Department issued the Administrative Complaint. Pursuant to this Complaint, the Department has sought the revocation of the Permit and prescribed certain orders for corrective action. No application has been submitted by or on behalf of Mr. Vail to the Department to construct and operate a wastewater treatment facility designed to accommodate the sewage flows which may be generated by the Inn as it has been constructed. Although the Department of Health and Rehabilitative Services and other agencies were aware that the Inn includes a restaurant and guest rooms, the Department was never so informed.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department issue a Final Order requiring that Mr. Vail comply with all of the corrective orders, except Paragraph 18, contained in the Administrative Complaint. DONE and ORDERED this 11th day of March, 1988, in Tallahassee, Florida. LARRY J. SARTIN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of March, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NUMBER 87-4242 The parties have submitted proposed findings of fact. It has been noted below which Proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. The Department's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact of Acceptance or Reason for Rejection 1 Conclusion of law. 2 1. 3 6. 4 10. 5 12 and 13. 6 14. 7 15. 8 18. 9 19. 10 20. 11-12 16. 13 21. 14 23. 15 24. 16 25. 17 26. 18-19 27. 20 28. 21 29 22 Hereby accepted. Mr. Vail's Proposed Findings of Fact 1A 15. Not supported by the weight of the evidence and irrelevant. Hearsay and irrelevant. Although technically true, this is not the issue in this case. The evidence did not prove that the system "can in actuality handle three times the amount permitted." Not supported by the weight of the evidence and irrelevant. 2A Not supported be the weight of the evidence. Exhibit 6 indicates that the Department was aware that the Inn included "hotel rooms" but not the number. Irrelevant. The evidence did not prove that the Department was aware of the scope of the project. Not supported by the weight of the evidence. 3A Irrelevant. Not supported by the weight of the evidence and irrelevant. Even if this were true, the fact remains that the Department was unaware that the Inn included guest rooms or an apartment. Irrelevant. 4A-B Irrelevant. 5A-B Irrelevant. 6A 2-4. B 5. 6 and 11. Not supported by the weight of the evidence. See 12. 13 and 15. Not supported by the weight of the evidence and irrelevant. Not supported by the weight of the evidence. 7A-C Not supported by the weight of the evidence and irrelevant. 8A-D Not supported by the weight of the evidence and irrelevant. 9A-B Not supported by the weight of the evidence and irrelevant. 10-12 Not supported by the weight of the evidence and irrelevant. COPIES FURNISHED: Richard L. Windsor, Esquire State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Mr. John Vail St. George Inn Post Office Box 222 St. George Island, Florida 32328 Dale Twachtmann, Secretary State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire General Counsel State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400