VINCENT J. WOEPPEL vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 92-004063 (1992)
Division of Administrative Hearings, Florida Filed:Lake Wales, Florida Jul. 06, 1992 Number: 92-004063 Latest Update: Apr. 16, 1993

Findings Of Fact On December 12, 1991, Petitioner applied to the Respondent for a permit/water quality certification to grade and level, in stages, approximately 20,000 square feet or 0.45 acres of lake front to remove and prevent the formation of berms and depressions in the exposed lake bottom adjacent to his property. The project site is located at 3955 Placid View Drive which lies along the shoreline of Lake Placid, a natural waterbody in Highlands County, Section 24, Township 37 South, Range 29 East. Lake Placid is not an aquatic preserve, and is not an outstanding Florida water. It has been designated as a Class III waterbody. Petitioner's unsubdivided lot lies at the western end of Lake Placid. The shoreline measures approximately 203 feet. The western lot line also measures 203 feet, and fronts on Placid View Drive. The water level of Lake Placid has receded in recent years which allows large expanses of what was historically lake bottom to become beaches, lawns, and areas of habaceous marsh. The specific project which the Petitioner proposes calls for the leveling of the berms and depressions which form on the exposed lake bottom from collected water, which stagnates and permits various noxious creatures, including mosquitoes, to breed in them. The berms and depressions are approximately six inches high or deep and between one and three feet wide, and generally extend the length of the shoreline. The proposed area affected is approximately 20,000 square feet or 0.45 acres of lake front, although Petitioner proposes to actually level a much smaller area in stages of approximately 2,000 square feet on an "as needed" basis. No material other than sod in the beach area is proposed to be brought from or removed to off-site locations. Petitioner is highly sensitive to mosquito bites. The area proposed for leveling was previously cleared of vegetation without authorization. Very little revegetation of the shoreline has occurred since the area was cleared. Vegetation colonizing the beach, at present, includes pennyworts (Centella asiatica and Hydrocotyle umbellata) and water- hyssops (Bacopa sp.) Blue green algae was observed in the depressions which have formed along the shore since the clearing. Fauna observed on-site included gulls (Larus sp.), small fish in the adjacent lake shallows, and water-boatmen (Order Hemiptera) in the depressions. An area landward of the wetlands considered here was also cleared previously and is proposed to be seeded. An adjacent, uncleared shoreline was vegetated with primrose willow (Ludwigia sp.), cattail (Typha sp.), flat sedge (Cyperus odorata), and other wetland species for an almost 100% plant coverage. The Petitioner proposes to use a small tractor in leveling of the shore which will cause turbidity in the lake water. No turbidity controls were proposed by the Petitioner. Petitioner failed to provide reasonable assurances that the turbidity caused by the earthmoving equipment in areas presently above water would not cause degradation of water quality in Lake Placid; would not contribute to the long-term degradation of water quality in the lake caused by upland runoff that would flow into the lake without benefit of retention or filtration by shoreland vegetation (freshwater herbaceous habitat) which would be permanently removed under Petitioner's proposal. Nutrients such a nitrogen and phosphorus and pollutants such as pesticides, herbicides and other chemicals commonly used in lawn and garden care would be included in the runoff, and would have an adverse impact on fishing and marine productivity in the lake. The project would have a minor adverse impact on erosion and soil stabilization in the area surrounding the lake. Petitioner has failed to provide reasonable assurance that the proposed project is not contrary to the public interest. Petitioner can mitigate the project by eliminating the use of heavy equipment and substitute hand equipment to smooth out ruts, berms and depressions in jurisdictional areas.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Petitioner's application for Wetland Resource Regulation permit be DENIED. DONE and ENTERED this 8th day of March, 1993, in Tallahassee, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings ths 8th day of March, 1993. COPIES FURNISHED: Francine M. Ffolkes, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Mr. Vincent J. Woeppel 3955 Placid View Drive Lake Placid, Florida 33852 Daniel H. Thompson Department of Environmental Regulation Acting General Counsel Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Virginia B. Wetherell Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (3) 120.57211.32267.061
# 2
DAVID SANGILLO vs LA RAE HAYS AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-005724 (1990)
Division of Administrative Hearings, Florida Filed:Jacksonville, Florida Sep. 10, 1990 Number: 90-005724 Latest Update: May 31, 1991

The Issue This cause concerns a dispute between the Petitioner and the Respondents concerning whether a permit ("dredge and fill") and water-quality certification should be issued by the Respondent, Department of Environmental Regulation (hereinafter referred to as "Department" or "DER"), authorizing the construction of a private dock with terminal deck and platform, in conjunction with the construction of a 250-foot "privacy fence" in the adjacent salt marsh, and whether construction, installation and operation of the facility will violate State water-quality standards and the public-interest standards embodied in Section 403.918, Florida Statutes.

Findings Of Fact LaRae Hays, the Respondent/applicant, owns real property to be used for residential purposes, which adjoins a salt marsh and tidal creek contiguous to the Nassau River in Duval County, Florida. The Respondent/applicant applied for a permit and water-quality certification so as to authorize the construction of a private dock with a terminal deck and "stepdown" platform. The applicant also seeks authority to construct a 250-foot by 8-foot wooden ??privacy fence", parallel to that dock. The structures are to be built on a tidal creek and within a salt marsh contiguous to the Nassau River. The application is opposed by the Petitioner, who is an adjoining property owner. The Petitioner opposes the application for the reasons referenced in the above Preliminary Statement. The Department is an agency of the State of Florida charged with regulating and permitting activities which may be sources of pollution, such as the instant project, which are constructed, operated or installed in waters of the State, as defined in Chapter 403, Florida Statutes, and Title 17, Florida Administrative Code. The Department is charged, as pertinent hereto, with reviewing applications, such as the subject application, to insure that the water-quality standards and public-interest standards embodied in Section 403.918, Florida Statutes, as well as Chapters 17-3 and 17-312, Florida Administrative Code, are complied with before issuing a permit authorizing the construction of the proposed facility. Mr. Tyler was called as the first witness for the Department. The parties stipulated that the Department could put on its case first in the order of proof. Mr. Tyler was accepted as an expert witness in the field of the "impact of dredge and fill projects on the environment~?. It was thus established that the Respondent/applicant's project is proposed for a piece of property in the adjacent salt marsh on Black Hammock Island in Duval County, Florida. The Respondent/applicant proposes to construct a private dock, 184 feet by 4 feet, with a 12-foot by 12-foot terminal deck and a 12-foot by 5-foot "stepdown" platform. A portion of the dock is already constructed and is included in the permit sought. The deck is proposed to be surrounded on three sides with a six-foot-high lattice wall covered with a pitched roof. During the course of the proceeding, however, the Respondent/applicant conceded that she would abandon the proposal to construct the lattice walls, would rather leave the terminal deck and roofed area open so that the neighbors' view of the salt marsh and river would not be obstructed and that she would rather install blinds which can be raised or lowered for the roofed portion of the proposed terminal deck. The Respondent/applicant previously dredged and placed fill on a portion of the wetlands in question and dredged a drainage ditch along the perimeter of the wetlands and the Respondent/applicant1s property. The fill was for the purpose of creating a sort of "causeway" leading from the upland property owned by the Respondent/applicant to the landward extent of the already-existing dock. Pursuant to informal enforcement action by the Department, the Respondent/applicant agreed to, and has, removed that fill material and corrected, or is about to correct, the dredging activity done without permit in the drainage ditch in question. The proposed project is located in Class II waters, classified as "conditionally approved" for shellfish harvesting. Normally, under the provisions of Rule 17-312.080(7), Florida Administrative Code, a dredge and fill permit for the proposed project and its construction could not be authorized in such Class II shellfish harvesting waters. However, the Department has granted a variance from that rule so that the activity sought to be permitted can be authorized as a result of the instant permit application, by its notice of intent to grant the variance entered on June 5, 1990. That variance became embodied in a Final Order of the Department authorizing it, entered on July 31, 1990. No interested party responded to due and appropriate notice of the intent to grant the variance, hence, the Final Order approving it. The variance was accompanied by mandatory conditions involving the protection of historical or archaeological artifacts, the prohibition of more than two boats being moored at the dock; of any overboard discharges of trash, animal or human waste or fuel; against any non-water dependent structure such as gazebos or fish-cleaning stations, which must be located on the uplands and against boat shelters having enclosed sides. Additional conditions were that any dock over grass beds should be constructed as to allow for maximum light penetration and that water depth at the mooring area for the dock shall be sufficient to prevent bottom scouring by boat propellers. Additionally, in the notice of intent to grant document, the Department has required that in order for the permit at issue to be granted, in addition to the general conditions applicable to any such permit, the following specific conditions shall be observed by the Respondent/applicant during and after construction: Historical and archeological artifacts shall be reported to the Department, as well as the Bureau of Historic Preservation, Division of Archives History and Records; Prior to commencement of the work, the permittee shall provide written notification of commencement to the Department; turbidity control shall be utilized throughout the project to contain any turbidity generated; The waterward end of the dock shall be marked by a sufficient number of reflectors as to be visible from the water at night by reflected light; All work shall be done during periods of average or low water in order to minimize turbidity; All disturbed areas shall be re-vegetated with indigenous vegetation in order to prevent erosion or unstabilized material entering into State waters; and Finally, that the project shall comply with applicable State water- quality standards. The Respondent/applicant has agreed to these conditions. Moreover, the testimony of Mr. Tyler establishes that no water-quality violations of the standards contained in Chapter 17-312 and 17-3, Florida Administrative Code, will be occasioned by the construction or operation of this facility. The pilings necessary to perform the construction involved will be installed at periods of low or average tide, such that the installation area will not generate turbidity in the State waters involved at the site. The dock is so designed that maximum light penetration will occur so that deleterious shading of the marsh grasses involved at the site and under the footprint of the dock will not occur. Moreover, the dock and the proposed fence, for that matter, would have a beneficial effect on benthic species diversity by encouraging aquatic invertebrates to attach and form colonies on the posts and pilings where they enter State waters. It was also established, through the Department's evidence, as well as the testimony of the Respondent/applicant's witnesses, that there is a sufficient water depth in the creek located at the waterward end of the proposed dock and ~?stepdown?? platform, such that the small boats which would be able to navigate the creek, being of sufficient shallow draft, will not occasion propeller scouring or propeller-generated turbidity when operated at prevailing water depths for boats which will be moored at the end of the proposed facility. In summary, it has been demonstrated that no State water-quality standards will be violated by the installation and operation of the proposed facility, given the conditions which the Respondent/applicant and the Department have already agreed upon and the Respondent/applicant has accepted on the record in this case, including the condition concerning no gazebo-type structures located on the dock and no fish cleaning facilities or fueling equipment or facilities on the dock or platforms. Such conditions should be incorporated in any Final Order and permit resulting from this proceeding. In addition to the water-quality considerations discussed above, it must be determined whether reasonable assurances have been provided by the permit applicant that the proposed project will meet the "public interest" standards of Section 403.918(2)(a)1-7, Florida Statutes. In this regard, it has been demonstrated by the evidence and testimony adduced by the Respondent/applicant and the Department that the project will not adversely affect the public health, safety or welfare or the property of others in the context of the various environmental concerns addressed and regulated by Chapter 403, Florida Statutes, and Title 17, Florida Administrative Code. The unrefuted testimony of expert witness, Tyler, establishes that the project will not adversely affect the conservation of fish and wildlife, including endangered or threatened species or their habitats. The project will not adversely affect navigation, the flow of water, or cause harmful erosion or shoaling. Mr. Tyler's testimony establishes that the ecosystem in the vicinity of the project consists of a natural intertidal saltwater marsh, which is currently in excellent condition and has a high relative value of functions as a habitat and nursery area for marine and estuarine vertebrate and invertebrate species. The project will not adversely affect fishing or marine productivity in the area involved nor have an adverse effect on the current condition and relative functional value of the marsh area in terms of habitat for, and the conservation of, fish and wildlife and in terms of its value as a marine and estuarine habitat and the marsh system's function in protecting water quality. Although the project will not adversely affect fishing or marine productivity in the vicinity of the project, the proposed "privacy fence" has not been shown to be "not contrary to the public interest'1 in terms of adverse effect on recreational values??. The "privacy fence" will not pose any of the other adverse consequences in terms of the above-discussed seven (7) public- interest standards nor will it impose a detrimental impact on water quality, especially since it will be elevated approximately a foot above the surface of the soil in the marsh area, preventing any impediment to normal tidal flows and flushing. The fence will, however, impose a detrimental effect on the recreational value of the State waters involved in the subject marshland area by impeding the aesthetic qualities of the view of the marshland and river system for adjoining landowners, specifically, the Petitioner. The fence will clearly impede this "passive recreational value" and reasonable assurances that it will not do so have not been provided in the testimony and evidence of record. The desire of the Respondent/applicant to install the fence is certainly understandable in view of the hostile relations between the Respondent/applicant and the Petitioner, caused to a great degree by the Petitioner's persistence in installing and operating an overly-bright nighttime security light and, more particularly, because of the Petitioner's habit of constantly photographing, with a video camera, the Respondent/applicants or her invitees while they are using the present dock. Because the fence will impede the recreational value of the marshland in terms of the aesthetic nature of the view of the marsh of the Petitioner, the permit should not include authorization for installation of the fence. The relevant and more peripheral facts established in this record prove the wisdom of the words of the poet, Robert Frost, who wrote that "good fences make good neighbors". The parties' dispute concerning the use of the security light and video camera more properly sounds in the circuit court, however. A proceeding involving disputed environmental permitting issues cannot serve to resolve all the "life management" disputes between the parties. In summary, the unrefuted evidence of record demonstrates that, with the exception of the last above mentioned consideration concerning the proposed fence, that the water quality standards and the public interest standards embodied in Section 403.918(1) and (2), Florida Statutes, will not be violated by the proposed project if the conditions mentioned above and those provided for in the Department's Exhibit 3, which are incorporated in these findings of fact by reference, are imposed on any grant of a permit. A grant of the permit should also be conditioned upon periodic monitoring of the installation of the proposed project, which the Department has agreed in this record to do.

Recommendation Accordingly, in view of the above findings of fact and conclusions of law it is, therefore RECOMMENDED that a Final Order be issued by the Department of Environmental Regulation granting the subject dredge and fill permit and water quality certification sought by the applicants provided that grant of the subject permit should include the general and specific conditions incorporated in the Department's Exhibit 3, as well as the conditions found to be necessary in the above findings of fact. DONE AND ENTERED this 31st day of May, 1991, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of May, 1991. COPIES FURNISHED: David Sangillo 15665 Shellcracker Road Jacksonville, FL 32226 LaRae Hays 1574 Menlo Avenue Jacksonville, FL 32218 William H. Congdon, Esq. Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Carol Browner, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, Esq. General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (1) 120.57
# 3
ROLF ROBERT vs. CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 89-002641 (1989)
Division of Administrative Hearings, Florida Number: 89-002641 Latest Update: Oct. 09, 1989

The Issue The issue in this appeal is whether the decision of the City of Clearwater Development Code Adjustment Board denying Petitioner's application for variances for certain signage on his property is supported by the evidence in the record, or whether it departs from the essential requirements of law. See Section 137.014(f)(3), City of Clearwater Land Development Code.

Findings Of Fact Petitioner is the owner of certain property located at 1923-1943 U.S. Highway 19 North, Clearwater, Florida (Section 05-29-16, M&B 23.05). This property is zoned CC (Commercial Center), and is the site of a strip shopping mall. On or about March 23, 1989, Petitioner applied for three variances for the subject property, as follows: 243 square feet to permit a total of 411 square feet of property identification signage; 13.5 feet in height to permit a 33.5 foot high pole sign; permission for a roof mounted sign. The Development Code Adjustment Board denied Petitioner's application for variances on April 13, 1989, and Petitioner timely filed this appeal of the Board's decision. Under the provisions of the City of Clearwater Land Development Code applicable to the Petitioner's property, only 168 square feet of property identification signage and pole signs not to exceed 20 feet in height would be allowed without a variance, and roof signs of any kind are prohibited unless a variance has been granted. Several months prior to Petitioner's filing for these variances, a roof sign was erected on the building located on the subject property. This roof sign consists of individual letters spelling "Harbor Square", which is the name of this shopping mall. The letters are from 3 feet, to 4 feet 9 inches in height, and span a distance of 34 feet 9 inches in width. The roof sign replaced a property identification sign at the right of way which previously carried the name of the shopping center, but the space on the pole sign previously used to identify the mall was not eliminated. That space is now used to identify a uniform business in the mall. Petitioner is seeking these after the fact variances to authorize the roof sign which has already been erected, and to approve the height of an existing pole sign. An enforcement action initiated by the City is pending this variance determination. Tenants in the Harbor Square mall testified that the change in signage has made the mall more visible and accessible, and several of their customers have commented that their businesses are now easier to find. The tenants feel that this change in signage will benefit their businesses financially. The Development Code Adjustment Board has previously granted variances from the signage limitations imposed by the Code, but the evidence produced at hearing indicates that none of these variances were granted after the fact. The two variances which were approved for roof signs were based upon a finding of conditions unique to the property which created a hardship for the applicant. In both instances, the Board found that the applicant had not created his own hardship, but that it arose from the size or positioning of the property involved in each application. In this case, nothing unique about the property can be found. The applicant has caused his own problems by allowing a sign to be erected without first obtaining a permit or variance. The Petitioner urges that it was the responsibility of his sign contractor to obtain all necessary permits or variances, and that the contractor did not inform him that a variance was necessary before he erected the sign. However, neither the sign contractor nor the Petitioner himself was present to testify, and therefore, there can be no finding with regard to his credibility, or with regard to whatever arrangement he had with the contractor. In any event, as the property owner seeking a variance, Petitioner has failed to establish any basis for a finding of a hardship or circumstance unique to his property, other than the fact that he allowed this sign to be erected without obtaining the necessary approvals from the City.

# 4
BAKER CUT POINT COMPANY AND JAMES C. DOUGHERTY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 80-002320RX (1980)
Division of Administrative Hearings, Florida Number: 80-002320RX Latest Update: Jan. 28, 1982

The Issue The matters here presented concern the challenges by the named Petitioners to Rule Sections 17-3.061(2)(b), 17-3.111 (11), 17-3.121(14), 17-4.02(17),(19), and 17-4.28(2), Florida Administrative Code, related to definitions of "submerged lands" and "transitional zone of a submerged land" and the requirements set forth by rule provisions for permits related to dredge and fill activities in "submerged lands" and in the "transitional zone of submerged land" and water quality in Florida. The rule challenges are in keeping with the provisions of Section 120.56, Florida Statutes. Specifically, Petitioners claim that the rules are invalid exercises of delegated legislative authority. The Petitioners do not, by the challenges, question the procedures utilized in the promulgation of the subject rule provisions.

Findings Of Fact Petitioner, Baker Cut Point Company, is a corporation which owns real estate in Key Largo, Florida, and James C. Dougherty owns the company. The Respondent, State of Florida, Department of Environmental Regulation, is a governmental body which has been granted certain regulatory powers, to include the responsibility for requiring environmental permits for certain activities over which the Respondent has jurisdiction. In furtherance of that responsibility, the Respondent has promulgated the aforementioned rules which are the subject of this rules challenge case. The Petitioners have been subjected to the terms and conditions of the aforementioned rule provisions in the course of their application for environmental permits for developments in property in Key Largo, Florida, under DER File Nos. 44-21381 and 44-14356. Those matters were the subject of a Subsection 120.57(1), Florida Statutes, hearing in Division of Administrative Hearings' Cases Nos. 80-760 and 80-1055. The hearings in those cases were conducted on the dates described in this order and were held in view of the disputed material facts between the parties occasioned by the Respondent's stated intention to deny the permits based upon the Respondent's belief that the activities contemplated within the permit process would be in violation of certain regulatory provisions, to include those rule provisions which are the subject of this action. Throughout the process of permit review and the hearing de novo, and in response to the revisions to the original permit requests, the Respondent has continued to claim jurisdiction in keeping with the rule provisions at issue. The Baker Cut Point Company DER File No. 44-14356 letter of intent to deny dates from April 3, 1980, and the corresponding letter of intent to deny related to DER File No. 44-21381, James C. Dougherty, dates from May 27, 1980.

Florida Laws (6) 120.56120.57403.021403.031403.061403.087
# 5
DUKE'S STEAKHOUSE FT. MYERS, INC. vs G5 PROPERTIES, LLC AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 10-010443 (2010)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Nov. 30, 2010 Number: 10-010443 Latest Update: Mar. 21, 2013

The Issue The issue in this case is whether the South Florida Water Management District (SFWMD) should issue an Environmental Resource Permit (ERP) for the redevelopment of property owned by G5 Properties, LLC (G5).

Findings Of Fact The property owned by G5 east of U.S. 41 and south of Sunrise Boulevard in Fort Myers was developed as separate parcels by different owners in the 1970’s and 1980’s under the stormwater management regulations in effect at that time. Similarly, the Duke’s property to the south was developed in that era under the same stormwater management regulations. The properties do not meet current ERP regulations. G5 acquired the two parcels comprising its property with the intention of redeveloping it, primarily by constructing a two-story medical office building on what was the southern parcel. G5 applied to upgrade the surface water management system on the property, primarily by installing a detention pond on the southern parcel and directing surface water flow from a designated sub-basin on the southern parcel into the detention pond. The detention pond was to serve the dual purposes of storage and water quality treatment. It was properly sized to store and treat the runoff from the sub-basin in a 25-year/3-day (the proper design) storm. Discharge from the detention pond was to be into the existing stormwater conveyance (an underground pipe) in the road right-of-way along the eastern property line (west of Austin Street). From there, water flows south into a drainage ditch to the south of the Duke’s property. From there, water flows west to Whiskey Creek and eventually into the Caloosahatchee River. (The River is impaired; neither the Creek nor the River are designated as Outstanding Florida Water). Although most of the redevelopment of G5’s medical office building is on what was the southern parcel, and most of the stormwater falling on the southern parcel is directed into the detention pond, there is a covered portico entrance on the north side of the medical office building with a driveway that ramps up to the entrance from the west and ramps down away from the entrance to the east. The covered portico and ramped driveway extend onto what was the northern parcel. Some of the surface water runoff from the driveway flows to the west into the Florida Department of Transportation (DOT) swale in the U.S. 41 right-of-way, as it did before redevelopment; some of the surface water runoff from the driveway flows to the east and north, onto what was the northern parcel of G5’s property. Except for this runoff flow from the driveway, the drainage patterns on the northern parcel remain practically the same, the only differences being the replacement of a small amount of impervious surface with new impervious surface (pavement) and a small amount of impervious surface with pervious surface. G5’s redevelopment of its medical office building includes a driveway along the south side of the building, just north of the Duke’s property, leading to parking on the south and east side of the building. Some of the surface water runoff from the entrance to the driveway flows to the west into the DOT swale in the U.S. 41 right-of-way, as it did before redevelopment. G5’s ERP does not provide for any storage or water quality treatment for runoff from the northern parcel, except for the addition of removable (for cleaning) filter inserts for the storm drains in that part of the property. During the application process, G5 modified its proposal to deepen the detention pond. This was done to allow the redeveloper of the Taco Bell half a mile to the south of the Duke’s property to take credit for additional storage and water quality treatment in order to get a Lee County permit for its project. The Taco Bell also was developed under the old stormwater management regulations, but its redevelopment was able to use a SFWMD “No Notice General Permit” because it impacted no wetlands, was less than ten acres, and had less than two acres of impervious surface. However, it needed a Lee County stormwater permit, which it could not get without additional water quality storage and treatment. Lee County allowed the Taco Bell redevelopment project to take credit for an increase in the depth of the detention pond at the G5 site and issued its permit. Although Taco Bell got credit for water quality storage and treatment at the G5 property, no surface water runoff from the Taco Bell site actually reaches G5’s detention pond, or even the Duke’s property. It flows north through the pipe along Austin Street to the drainage ditch to the south of the Duke’s property, and from there to Whiskey Creek and the Caloosahatchee River. However, the deeper detention pond would provide additional storage and water quality treatment for the G5 site for storms bigger than the design storm. Petitioner’s surveyor testified that there are up to four places along the property line between the G5 property and the Duke’s property where topography indicates that some surface water runoff can flow from the G5 property across the property line to the Duke’s property, post-redevelopment. His testimony was based on a comparison of spot elevations he took in the vicinity of the property line with elevations taken by other surveyors. In addition, the surveyor could not say how much flow would occur in a 25-year, 3-day storm. There was persuasive testimony from G5’s engineer that the flow from one of the four locations identified by Petitioner’s surveyor (in the southeast corner of the southern parcel of G5’s property) existed pre-redevelopment. Contrary to Petitioner’s argument, this testimony actually did not contradict other testimony of the engineer that all runoff from the new pavement on the southern parcel of the G5 property was intended to flow into the new detention pond. In that location in the southeast corner, G5’s redevelopment project removed pavement, added 4-inch high curbing along the edge of the new pavement, and added grass between the curb and the property line (which would tend to reduce runoff onto the Duke’s property). Another location identified by Petitioner’s surveyor was between the new office building and the property line. The surveyor related a water stain on the pavement and an exposed tree root ball to significant standing water and high flow conditions. Petitioner contends that this occurs because an asphalt overlay, four-tenths of a foot thick, was placed on top of the existing pavement in that area. To the contrary, G5’s engineer testified that the surface water management system functions as it should and that the overlay did not change the grade but was “just to benefit the existing asphalt from deteriorating any more.” The water stain could be attributable at least in part to landscape irrigation, and the tree root may have been exposed mechanically. Even if the surveyor’s testimony proved that there is some water flow in that area, he could not testify as to the quantity of flow. Based on a preponderance of the evidence, G5 provided reasonable assurances that its surface water management system functions properly and that post-redevelopment runoff from the G5 property onto the Duke’s property does not exceed pre- redevelopment conditions. Petitioner cites significant standing water on the Duke’s property after a heavy rain on January 26, 2011, as proof that the G5 redevelopment has caused flooding of the Duke’s property. However, there was no standing water on the G5 property, and hardly any water in the detention pond. The standing water on Petitioner’s property was above two storm drains on the western part of the Duke’s property, which drain into the same pipe as the storm drains on the western side of the G5 property and the outfall structure discharging from the detention pond on the G5 property. The standing water on the Duke’s property probably was caused by clogs in the drains in the Duke’s stormwater management system, not by G5’s redevelopment. Mr. Harrow claimed that the Duke’s property was inspected when purchased, its stormwater management system was functioning properly, and it was properly maintained. But he also testified that maintenance ceased at some point and that it would require an engineer to correct what is wrong with it now, which Mr. Harrow believed to be cost-prohibitive and the responsibility of G5, not Petitioner. Petitioner contends that no ERP should issue for G5’s redevelopment project without the participation of Taco Bell in the operation and maintenance of the G5 detention pond. To the contrary, the Taco Bell permit might be deficient if Taco Bell has no control over the operation and maintenance of G5’s detention pond, but there is no reason why Taco Bell has to participate in the operation and maintenance of G5’s detention pond. By a preponderance of the evidence, G5 provided reasonable assurances that it has the legal and financial ability to operate and maintain its system, including the detention pond. If a new development, G5’s redevelopment project (which includes all 3.41 acres in the northern and southern parcels of the G5 property) would not meet the criteria for issuance of an ERP because there was no demonstration that there is enough water quality storage and treatment. However, because of the addition of water quality storage and treatment for the southern parcel and the addition of filters for the drains on the property, the redevelopment of the site resulted in a net improvement in water quality storage and treatment.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that SFWMD deny G5 an ERP for its redevelopment for failure to meet BOR requirements as to water quality storage and treatment. DONE AND ENTERED this 25th day of May, 2011, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of May, 2011. COPIES FURNISHED: Margaret M. Craig, Esquire Bricklemyer Smolker & Bolves, P.A. 500 East Kennedy Boulevard, 2nd Floor Tampa, Florida 33602-4936 Matthew D. Uhle, Esquire Law Office of Matthew D. Uhle, LLC 1617 Hendry Street, Suite 411 Fort Myers, Florida 33901-2926 Douglas H. MacLaughlin, Sr., Esquire South Florida Water Management District 3301 Gun Club Road, Mail Stop Code 1410 West Palm Beach, Florida 33406-3007 Tommy B. Strowd, Interim Executive Director South Florida Water Management District 3301 Gun Club Road, Mail Stop Code 1410 West Palm Beach, Florida 33406-3007

Florida Laws (5) 120.52120.569120.57373.079403.412 Florida Administrative Code (3) 40E-4.09140E-4.30140E-4.302
# 6
BAYSHORE HOMEOWNERS ASSOCIATION vs. GROVE ISLE, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-002186 (1979)
Division of Administrative Hearings, Florida Number: 79-002186 Latest Update: Apr. 08, 1980

The Issue Has the applicant, Grove Isle, Ltd. provided reasonable assurances and affirmatively demonstrated that its proposed marina is clearly in the public interest and will not lower the existing ambient water quality of Biscayne Bay, a designated outstanding Florida water?

Findings Of Fact On March 13, 1978 an application was made to DER for a water quality control permit to construct a wet-slip marina on the west side of Grove Isle, formerly known as Fair Isle and Sailboat Key. The original plan for the marina, which was initially objected to by the Department of Environmental Regulation, was modified to protect a bed of seagrasses extending about 30 feet wide in a band along the west side of the island. While the plans were being modified and consultations with other government permitting agencies were in progress, the application was "deactivated" from September 27, 1978 until March 30, 1979. As a result of its investigation and review, DER on October 23, 1979, issued a letter of intent to grant the permit to Grove Isle, Inc. The permit if granted, would allow the applicant to construct six concrete fixed piers, five "T" shaped, one "L" shaped, with a boat docking capacity of 90 pleasure boats. The piers will extend a maximum of 165 feet offshore from an existing concrete bulkhead. The width of the piers will be 8 feet from the bulkhead to a point 41 feet offshore, and then increased to a width of 10 feet. A sewage pump-out facility is also proposed. Attached to that letter of intent were the following conditions: Adequate control shall be taken during the construction so that turbidity levels outside a 50 foot radius of the work area do not exceed 50 J.C.U's, as per Section 24-11, of the Metropolitan Dade County Code. During construction, turbidity samples shall be collected at a mid-depth twice daily at a point 50 feet up stream and at a point 50 feet down stream from the work area. The contractor shall arrange to have turbidity sample results reported to him within one hour of collection. Turbidity monitoring reports shall be submitted weekly to DER and to the Metropolitan Dade County Environmental Resources Management (MDCERM) If turbidity exceeds 50 J.C.U's beyond a 50 foot radius of the work area, turbidity curtains shall be placed around the work area and MDCERM notified immediately. Turbidity samples shall be collected according to condition two above, no later than one hour after the installation of the turbidity curtain. It turbidity levels do not drop below 50 J.C.U's within one hour of installation of the curtain all construction shall be halted. Construction shall not be resumed until the contractor has received authorization from MDCERM. No live-a-board vessels (permanent or transient) shall be docked at this facility unless direct sewage pump-out connections are provided at each live-a-board slip. A permanent pump-out station shall be installed and maintained for further removal of sewage and waste from the vessels using this facility. Compliance with this requirement will entail the applicant's contacting the Plan Review Section of MDCERM for details concerning connection to an approved disposal system. Boat traffic in the shallow 30 foot wide dense seagrass area which parallels the shoreline shall be restricted by the placement of wood piles on 6 foot centers along the entire shoreline facing the marina. The channel from this marina to deeper water in Biscayne Bay shall be marked to prevent boats from straying into adjacent shallow areas. This will prevent habitat destruction. A chemical monitoring program shall be established to determine the effect of this marina on the water quality of this section of Biscayne Bay. Surface and mid-depth samples shall be collected at three points in the project area and at one background station. Parameters shall include, but not be limited to dissolved oxygen, pH, salinity, temperature, total coliform and fecal coliform and fecal streptococci bacteria, oil and grease, biochemical oxygen demand, and turbidity. Background samples shall be collected prior to construction and quarterly for a minimum of one year after 90 percent occupancy of the marina. In addition to the chemical monitoring program, a benthic community monitoring program is to be established. Samples of the benthic seagrass community within and adjacent to the project area are to be collected prior to construction and quarterly for a minimum of one year after 90 percent occupancy of the marina. Should either monitoring program detect dissimilar changes at its monitoring and control stations, DER and MDCERM shall be notified of the results. The monitoring programs shall be reviewed and approved by DER and MDCERM prior to implementation. Monitoring reports shall be submitted to DER and MDCERM and the United States Corps of Engineers on regular basis. Warning signs shall be posted in the marina area to advise marina users that manatees frequent the area and caution should be taken to avoid collisions with them. With the foregoing conditions imposed, the Department concluded that no significant immediate or long term negative biological impact is anticipated and state water quality standards should not be violated as a result of the proposed construction. Grove Isle, Inc., has agreed to comply with all the conditions established by the DER letter of intent to grant the permit. Grove Isle is a spoil bank in Biscayne Bay located approximately 700 feet east of the Florida mainland. It is linked to the mainland by a two-lane concrete bridge. The island is currently under development for a 510 unit condominium community with associated facilities such as a restaurant, hotel, and the proposed marina. The island is surrounded by a concrete bulkhead constructed many years ago. No changes in the bulkhead line are proposed. Grove Isle, Inc., proposes constructing the marina on concrete piles driven into the Bay bottom from a shallow draft barge. During construction there would be some turbidity caused from the disruption of the Bay sediment. This can however be adequately controlled by the use of turbidity curtains during construction. The construction will not require any dredging or filling. In the immediate marina site the most significant biota are a 30 foot wide bed of seagrasses. There are no other important biota because at one time the area was extensively dredged to create the island. There are no oyster or clam beds nearby. While lobsters may have once frequented the area, they too are no longer present. The water depth in the area ranges from 1 foot near the island bulkhead to 12 feet offshore to the west of the island. This particular seagrass bed consist primarily of turtle grass (thalassia, testudinum) with some Cuban Shoal Weed (Halodule, Wrightii). Protection for these grasses will be provided by a buffer zone between the island and the boat slips. The grassy zone will be bordered by a row of dolphin piles to exclude boat traffic. Because the grass requires sunlight for photosynthesis and therefore life, the six piers will have grated walkways where they pass over the grass. This will allow sunlight to reach below. In addition to the small grass bed on the west of the island there are extensive beds to the northeast, east and south of the island that extend several hundred yards from the island in water depths of three to ten feet. If boat traffic in the vicinity is markedly increased due to the existence of the marina, it is conceivable that the number of propeller scars in these shallow beds could increase. At the present time the beds are already traversed by boats, some of which are owned by Petitioner's members. There are already for example, approximately 50 crafts which operate from the nearby mainland or from Pelican Canal directly to the north of the island. Propeller scars take up to fifteen years to heal yet the number of scars in the Grove Isle area is insignificant and even a tripling of them from an additional 90 boats would still be de minimus. Potential damage to the seagrasses on the north side of the island will be minimized by the planned installation of navigation markers by Grove Isle. These markers will channel boats into water of a navigable depth and lessen the number of groundings and near groundings which cause the scarring. There is evidence that pleasure boats by their very existence and operation in the water are potential pollution sources. For instance, various maintenance chemicals such as anti-fouling bottom paint and wood cleaner have the ability, if used in sufficient quantity, to harm marine life. The fueling of engines and sewage discharge from boats are additional pollution sources. There was however, no showing that the location of up to 90 pleasure and sport fishing craft at the proposed marina site would in any way cause a degradation of water quality below the acceptable standards for Class III waters. At the present time, the marina site has adequate flushing to disburse those pollutants which may be generated by the marina operations. While a hydrographic survey was not requested by DER or provided by Grove Isle at the time the permit application was made, the testimony of Dr. Echternacht at the time of the Hearing provided adequate assurances respecting the hydrographic characteristics of the proposed site. The proposed marina will have no fueling or maintenance facilities. No live-a-board craft will be allowed at the marina. Both Mr. Wm. Cleare Filer and David A. Doheny live close to Grove Isle. Mr. Doheny's residence is on the mainland facing the proposed marina site and Mr. Filer's house is on Pelican Canal. They use the waters of Biscayne Bay around Grove Isle for recreation. If the quality of the water in the proposed marina site were lessened their substantial interest would be affected. Biscayne Bay is classified as a Class III water and is in the Biscayne Bay Aquatic Preserve. Careful considerations has been given to each of the proposed findings of fact submitted by the parties. To the extent that they are not contained in this Order, they are rejected as being either not supported by competent evidence or as immaterial and irrelevant to the issues determined here.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That a Final Order be entered by the State of Florida, Department of Environmental Regulation, determining that the requested water quality control permit and certification be issued subject to the conditions contained in the Notice of Intent to Issue Permit and that the Relief requested by the Petitioners be denied and their Petitions be dismissed. DONE and ENTERED this 22nd day of February, 1980, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: David A. Doheny, Esquire 1111 South Bayshore Drive Miami, Florida 33131 Wm. Cleare Filer 3095 Northwest 7th Street Miami, Florida 33125 Joel Jaffer 2479 Southwest 13th Street Miami, Florida 33145 Randall E. Denker, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Larry S. Stewart, Esquire Frates, Floyd, Pearson, Stewart, Richmond & Greer One Biscayne Tower 25th Floor Miami, Florida 33131 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION BAYSHORE HOMEOWNERS ASSOCIATION, INC., et al., Petitioner, vs. CASE NO. 79-2186 79-2324 STATE OF FLORIDA, 79-2354 DEPARTMENT OF ENVIRONMENTAL REGULATION, and GROVE ISLE, LIMITED, Respondent. /

Florida Laws (8) 120.50120.52120.57258.37258.42403.021403.087403.088
# 8
THOMAS A. DRISCOLL vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, ENGLE HOMES AND LAKE BERNADETTE, INC., 01-002471 (2001)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Jun. 25, 2001 Number: 01-002471 Latest Update: Dec. 03, 2001

The Issue The ultimate legal and factual issue in this matter is whether Engle Homes, Inc., and Lake Bernadette, Inc. (Permittees), have provided the Southwest Florida Water Management District (District) with reasonable assurances that the activities they propose to conduct pursuant to Management and Storage of Surface Water (MSSW) General Construction Permit No. 49005837.017 (the Permit) meet the conditions for issuance of permits established in Rules 40D-4.301, 40D-4.302, and 40D- 40.302, Florida Administrative Code. In particular, the issues of fact to be litigated are whether the Project will cause adverse water quality impacts to receiving waters and adjacent lands; whether the Project will cause adverse flooding of on-site or off-site property; whether the Project will cause impacts to existing surface water storage and conveyance capabilities; and whether the Project will adversely affect the property of others.

Findings Of Fact The Parties Engle Homes, Inc., and Lake Bernadette, Inc., are corporations licensed to operate in the State of Florida. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries pursuant to Chapter 373, Florida Statutes, and the rules promulgated thereunder as Chapter 40D, Florida Administrative Code. Driscoll resides at 35716 Welby Court, Zephyrhills, Florida 33541, Lot 14, within the Timber Creek 2 Subdivision (Subdivision). Driscoll requested this hearing to show the District that there is a drainage problem on Lots 13 and 14, and the adjacent Geiger property to the south, which should be fixed at this time and as part of the Project. Driscoll wants "Engle Homes to propose a new solution to fix the entire Welby Court Geiger property problem," i.e., from Lots 4 through 14, and not a piecemeal solution as proposed in the Permit modification. The Subdivision Engle Homes, Inc., and Lake Bernadette, Inc., developed the Timber Creek 2 Subdivision. Lots 15 through 25 run east to west and are north of Welby Court. Lots 15 and 16 are located north of the cul-de-sac, on the eastern portion of Welby Court. Lots 3 through 14 run west to east, south of Welby Court. Lots 13 and 14 are south of the cul-de-sac on the eastern portion of Welby Court and are across the street and the cul-de-sac from Lots 16 and 15, respectively. Residences exist on Lots 5, and 7 through 14. Driscoll owns Lot 14, a corner lot, which is the southeastern most lot of the Subdivision. Don Geiger (Geiger) owns the land (approximately five acres) south of the property lines of Subdivision Lots 5 through Geiger's northern driveway, essentially a dirt road, runs parallel to Lots 5 through 14. Subsequent to the original construction activity involving the Subdivision, the developer realized that there was an "existing depression" (referenced on Engle Exhibit number 1), south of Lots 7 and 8, and on Geiger's property. Geiger complained to the District about standing water in this area. This depression area is approximately 90 feet long and 30 feet wide which needed to be "drained off" according to Geiger. The depressed area on Geiger's property was most likely caused when Lots 7 through 14 were graded and sodded, which raised the "lots up a few inches" above Geiger's driveway/property. Water is trapped during a storm event between the back yards and the depressed area. As a result, the southern end of the back yards, particularly Lots 7 and 8, and the driveway remain constantly wet. The Project On January 16, 2001, Engle Homes, Inc., and Lake Bernadette, Inc., filed MSSW Permit Application No. 49005837.017 with the District, to address the problems with the rear lot grading and the adjacent property. The actual Project area for the permit modification1 includes the southern portions of Lots 4 through 9 and south of the property lot line including Geiger's property. See Finding of Fact 5. The modified permit does not address the drainage area including the back yards of Lot 13 and Driscoll's Lot 14, and the other portion of Geiger's property/driveway to the south. On April 5, 2001, the District issued MSSW Permit No. 49005837.017 to Engle Homes, Inc., and Lake Bernadette, Inc., under the provisions of Chapter 373, Florida Statutes, and Chapter 40D-40, Florida Administrative Code, for the modification of a surface water management system to serve the Project area. The proposed Project will involve the construction of a concrete inlet box with a safety grate, storm sewers, and grass swales. Specifically, the project is intended to solve the drainage problems associated with the "existing depression" south of the boundary line for Lots 7 and 8 on Geiger's property (although Lots 4 through 9 ("area 1") are included within the Project area), and the back yards of Lots 7 and 8. A catch basin is proposed to be located south and on the lot line between Lots 8 and 9, which is expected to drain off the water in the depression area to the modified surface water management system. The inlet box will be placed in the corner between Lots 8 and 9. The collected water in the inlet box will be routed underground through a series of 18-inch storm sewer pipe straight north through a drainage easement between Lots 8 and 9 to Welby Court. The underground pipe ties into an existing pipe in front of Lot 9 on the street, then runs east along the Welby Court right-of-way and then north between Lots 19 and 20, and eventually north into a large permitted retention pond, located to the north of the Subdivision which will handle the stormwater. Driscoll's Alleged Drainage Problem There is another distinct drainage area, i.e., "area 2," which includes Geiger's property and the southern portions of Lots 13 and 14, where water drains from south to north into a roadside ditch to Geiger Cemetery Road ("area 3"), which runs south to north and east of Lots 14 and 15. During a September 2001 tropical storm, there was standing water on Geiger's driveway, directly south of Lots 13 and 14, which was present for more than 3 days. This was referred to by Mr. Barrett as a "small drainage problem that could easily be corrected." On the other hand, Geiger says that there is standing water on his driveway, south of Lots 13 and 14, "all the time." This caused Geiger to move his driveway "50 or 60 feet" south. According to Geiger, the berm, which runs across Lots 10 through 14, should be lowered and the backyards reconfigured. But this would be quite disturbing to the neighbors. Therefore, Geiger recommends the placement of drains south of Lots 13 and 14, which would direct the water out to the ditch at Geiger Cemetery Road and away from Driscoll's Lot 14. The modified Permit is not intended to solve this problem, although Driscoll wants this problem fixed. It is not necessary to resolve Driscoll's issue regarding whether there is a drainage problem in and around Driscoll's lot. The two drainage areas 1 and 2 discussed herein are not connected, although they are close in proximity. The solution to the first problem has no impact on the second, and there is no cited statutory or rule requirement that both issues must be addressed in this Permit application. This is Driscoll's quandary. Compliance with Rules 40D-4.301 and 40D-4.302, Florida Administrative Code The Project will not impact wetlands or surface waters. The Project will not adversely impact the value of functions provided to fish and wildlife, and listed species, including aquatic and wetland-dependent species, by wetlands or other surface waters and other water-related resources. The Project will not adversely impact the quality of receiving waters such that the water quality standards will be violated. The Project will not cause adverse secondary impacts to the water resources. The Project will not adversely impact the maintenance of surface or groundwater levels or surface water flows established pursuant to Section 373.042, Florida Statutes. The Project will not cause adverse impacts to a work of the District. The Project is capable, based on generally accepted engineering and scientific principles, of being effectively performed and of functioning as proposed. The Project will be conducted by an entity with financial, legal, and administrative capability of ensuring that the activity will be undertaken in accordance with the terms and conditions of the permit, if issued. The Project will comply with any applicable special basin or geographic area criteria established pursuant to Chapter 40D, Florida Administrative Code, by the District. The Project will not adversely affect the public health, safety, or welfare. The Project will not adversely impact the conservation of fish and wildlife, including endangered or threatened species, or their habitats. The Project will not adversely affect navigation. The Project will not cause harmful erosion or shoaling. The Project will not adversely affect fishing or recreational values or marine productivity in the vicinity of the Project. The Project will not adversely affect significant historical and archeological resources. The Project will not cause unacceptable cumulative impacts upon wetlands and other surface waters. The Project area is less than 100 acres. The Project does not require dredging or filling of wetlands, or construction of boat slips. The Project is not contrary to the public interest. The Project will not cause adverse water quantity impacts to receiving waters and adjacent lands, and will not adversely affect or impact the property of others, including Driscoll's property, Lot 14. "Area 1," between Lots 4 and 9, is a separate drainage area, and the water from this area does not drain to Lot 14. Driscoll's property is not within the Project area, and the Project was not intended to resolve his alleged drainage problem. The Project will not cause adverse flooding to on-site or off-site property. The Project will not cause adverse impacts to existing surface water storage and conveyance capabilities. Rather, the project is expected to improve the conveyance of water and drainage for "area 1" and the Project area.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order issuing Management and Storage of Surface Water General Construction Permit No. 49005837.017. DONE AND ENTERED this 24th day of October, 2001, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of October, 2001.

Florida Laws (2) 120.569373.042