The Issue The issue here presented concerns the entitlement of the Applicant/Respondent, Walker G. Miller, to construct an addition to his existing boat house of approximately 450 square feet, and an addition to his existing chain link fence, both of which are located on Lake Down, Florida. The Respondent, Department of Environmental Regulation, has indicated its intention to grant the permit application request and the Petitioners, Milton and Gail Hess, and David Storey and others, have opposed the Department's intention to grant the permit.
Findings Of Fact The Petitioner in Case No. 80-1769, Milton Hess, is an adjacent landowner to the Applicant/Respondent, Walker G. Miller, with property located on Lake Down, near Windermere, in Orange County, Florida. The Petitioners in Case No. 80-1770, David Storey and others, are also landowners on Lake Down. Applicant's parcel is located on Down Point, which is a peninsular extending from the Lakes's southern shore. The project as contemplated by the Applicant is the construction of a 15 foot by 30 foot unenclosed addition on the north side of an existing dock/boathouse combination located on Lake Down. The 450 square foot addition is to be utilized as a storage room adjacent to the boathouse portion of his existing structure. The present structure has a total surface area of approximately 825 square feet. Additionally, by amendment to the application made on August 13, 1980, Applicant proposes to construct a chain link fence from the south property line to the dock facility. Lake Down is one of the waterbodies that constitutes the Butler Chain- of Lakes. The Lake is characterized by outstanding water quality and diversified biological resources. The Chain-of Lakes is widely recognized as the outstanding aquatic resource in the State, as far as water quality is concerned. Development on Lake Down is light, with widely scattered residential units separated by expanses of citrus groves. The construction of the addition will not significantly impact Lake Down or the Butler Chain-of Lakes, either on a long-term or short-term basis. The shading effect of the structure will result in a slight decline of rooted aguatic vegetation. However, such decline should be minimal. Further, reasonable assurances have been given that the proposed project would not result in any violations of State water quality criteria or standards. The existing dock structure now obstructs a portion of the view of the lake enjoyed by Petitioner Hess. However, by constructing the proposed addition on the north side of the existing boathouse, no further impediment of the view will occur.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a permit be granted by the Department of Environmental Regulation to Walker G. Miller to construct an addition to his boathouse and a chain link Fence on Lake Down as more specifically described in his amended application. DONE and ENTERED this 2nd day of February, 1981, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of February, 1981. COPIES FURNISHED: David Storey Route 3, Box 929 Orlando, Florida 32811 Jack Ezzard and Kathryn Ezzard Route 3, Box 925 Orlando, Florida 32811 Tari Kazaros Route 3, Box 924 Orlando, Florida 32811 Mrs. H. D. Barrarly Post Office Box 203 Gotha, Florida 32734 Paula M. Harrison Post Office Box 203 Gotha, Florida 32734 Ava Careton Route 3, Box 926 Orlando, Florida 32811 Nikki Clagh Route 3, Box 928 Orlando, Florida 32811 Milton and Gail Hess 4413 Down Point Lane Windermere, Florida 32786 Walker G. Miller Post Office Box 348 Windermere, Florida 32786 B. J. Heller, Esquire 644 West Colonial Drive Orlando, Florida 32804 Richard D. Lee, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301
The Issue The issues in this proceeding involve whether the Respondent, St. Joe Paper Company ("St. Joe"), is entitled to a "dredge and fill permit" authorizing it to construct a marina for recreational boats, containing 84 boat slips, along the eastern shore of the St. Johns River in St. Johns County, Florida. Embodied within that general consideration are issues involving whether St. Joe, in the construction and operation of the marina, can comply with water-quality parameters embodied in Chapter 17- 3, Florida Administrative Code, for Class III waters of the State, Section 403.918(1), Florida Statutes, as well as the public interest standards of Section 403.918(2), Florida Statutes, and the standard concerning "cumulative impact" embodied in Section 403.919, Florida Statutes.
Findings Of Fact The applicant, St. Joe, seeks to construct and operate a recreational boat marina, consisting of a single, main pier, 12 feet wide and extending some 850 feet waterward in a westerly direction from the shoreline of the east bank of the St. Johns River in St. Johns County, Florida. The main pier will join a terminal pier extending approximately 575 feet in a general north/south direction parallel to the shoreline of the St. Johns River, perpendicular to and abutting the longer main pier. Extended in a landward or easterly direction from the terminal pier structure will be four (4) individual "finger piers" ranging from 119 to 305 feet in length. Located along the individual piers and along a portion of the main pier near the waterward end of it will be 84 slips for recreational-type boats. Additionally, a breakwater system will be suspended along the outer perimeter of the terminal pier and northernmost and southernmost individual piers in order to reduce wave action and its effect on boats in the interior of the marina. Additional details concerning the marina design and operation are contained in the findings of fact below. The Site The site of the proposed marina is on the eastern shore of the St. Johns River in St. Johns County, Florida. At that point, the St. Johns River is almost two miles wide, being approximately 10,000 feet from shoreline to shoreline. The proposed marina site encompasses approximately 1,100 linear feet of river bank frontage. All of the adjacent upland property is owned by St. Joe, and St. Joe owns extensive additional river frontage to the north and south of the marina site. The nearest properties not owned by St. Joe are located 3,500 feet to the north of the site and 1,500 feet to the south of the site. The site is located approximately two miles north of Hallowes Cove, a relatively pristine, diverse and productive marine habitat. The site is characterized, landward of the terminal end of the pier and waterward of the upland, by an unvegetated "near shore area or tidal zone" which extends approximately 50 feet from the mean high-water line of the river to the mean low-water line. Waterward of this zone and extending to a depth of approximately two feet is a system of grass beds, (vallisnerida), commonly known as "tape grass". The grass beds extend approximately 200 to 250 feet from the shoreline. Waterward of the grass beds is an unvegetated area with a gradual slope to a depth of approximately six feet. From the six-foot contour of the river bottom, a relatively precipitous slope begins, extending to depths which exceed 19 feet. In this zone, there are no grass beds. Further waterward and extending beyond the most waterward extent of the the marina site, the river bottom rises somewhat to depths of 13 feet, 12 feet and 11 feet, in the direction of the center of the river. The river bottom substrate in the area of the marina is composed primarily of sand. This includes some shell and other coarse materials, with minor amounts of silt. In fact, organic silt is a very small portion of the bottom sediments, consisting, at a depth of four and one-half feet, of less than 1% silt and at a depth of 15 feet of less than 6% silt content. The present water quality prevailing at the marina site is good, and the benthic habitat in the general area is healthy and diverse. The most landward boat slips proposed at the marina will be located at a distance of approximately 275 feet from the most waterward extent of the grass beds. These most landward slips will be located in depths of approximately eight feet. Access to the marina will be from the north and south in defined channels marked on the west by the end of the individual piers and on the east by channel markers located at the depth contour of minus six feet. That is, the six-foot depth will be the most shallow portion of the channel marked by the channel markers, so that boats will not be permitted to navigate the shallower portion landward of the channel markers insofar as the marina's enforcement program can insure that. The approximate width of the northern channel is 75 feet, and the width of the southern channel is 50 feet. Due to the precipitous drop in depth beyond the contour of minus six feet, the average depth of the channels is 10 to 12 feet. The majority of the boat slips, as well as the basin of the marina, will be located in depths of between 10 and 18 feet. The consultant and expert witness who designed the marina, Erik Olsen, established that the length of the main pier and the location of the most landward of the boat slips and the location of the channel markers are all part of a design and plan intended to insure that marina and boat activity within the marina occur well beyond the extant grass beds and waterward of depths of six feet, to insure that no damage to the grass bed habitat area is occasioned by propeller scouring, "prop-wash", or grounding of boats. Other design measures are also intended to preclude boaters from entering the shallow depths and grass bed areas. Two tiers of signs will be located between the marina basin and the most waterward extent of the grass beds. First, regulatory buoys and signs are proposed to be located at the contour of minus four feet and will establish a "manatee protection zone" landward of that contour. The evidence reveals, however, that a safer contour for the manatee protection zone boundary to be established by the applicant would dictate placing the regulatory warning signs concerning the manatee protection zone at the same contour, minus six feet of water, where the channel markers will be located. This is because the marina will serve boats of up to 4.5 feet in draught. Secondly, a tier of signs will be located approximately ten feet waterward of the most waterward extent of the grass beds warning boaters that aquatic grass beds exist landward of the signs and that prop dredging and boat operation is prohibited. Such warnings at the locations found above should be mandatory conditions to any grant of the permit. A specific, agreed-upon condition is already in the draft permit issued by the Department prescribing the size and lettering of these signs and other design details. A railing will extend, as proposed by the applicant, along the main pier between the slips and the shoreline to discourage boaters from mooring along the main pier, landward of the slips. The evidence establishes that in order to more adequately insure protection of the manatee habitat area and the grass beds, a mandatory condition in boat-slip rental leases should be inserted to absolutely prohibit boaters from mooring along the main pier, landward of the boat slips. Because of the currents and significant water depth prevailing at the marina site, the marina construction will require no dredging nor will operation and maintenance of the marina require any dredging on a continuing basis. Additionally, in the interest of protecting water quality, no fueling facilities or boat fueling will be permitted at the marina at all; and the grant of a permit should be mandatorily conditioned on this basis. Neither will any boat maintenance or repair be permitted at the marina, including no hauling of boats or scraping or painting of boat bottoms. This condition should be clearly pointed out to users of the marina by appropriate warning signs regarding the prohibition against boat maintenance and repair, including warnings concerning the proper methods of disposal of used oil and other petroleum products. The marina will feature pump-out facilities for boat heads and bilges. The pump-out facilities will consist of a central pumping system in which waste is removed from the boats, transported by pipeline to an upland, central waste water collection and treatment system. No holding tanks or other storage of wastes will be located at the piers. The pump-out facility will serve not only the boat heads but also boat bilges in order to prevent contaminants, such as oil and boat fuel from entering the State waters involved. The piers will feature trash collection containers of appropriate number, size and location on the piers so as to provide convenient trash disposal for each boat slip. The piers will also feature plastic modular dock boxes to preclude boaters from randomly storing materials and equipment on the piers. No fish cleaning will be permitted on the piers at all, but rather must be accomplished on the uplands, with disposal of related wastes in the upland collection system. A "no wake" zone will be established in an area extending 500 feet north and 500 feet south of the marina. The "no wake" zone will be marked pursuant to requirements of the Florida Marine Patrol. The marked "no wake" zone should also extend waterward of the farthest waterward extent of the marina, as well as 500 feet north and south of it. Only private, recreational boats will be moored at the marina. All commercial boats will be prohibited. The marina will serve a Yacht Club to be developed by St. Joe in conjunction with the marina. Only members of the Yacht Club and their guests will be permitted to use the marina. This will assist with enforcement of the various conditions on marina operation and maintenance by the owners as to the boat-slip lessees and their guests. This and all other conditions should be enforced by mandatory restrictions in the boat-slip leases. Likewise, the applicant has agreed to permit no "liveaboard" boats at the marina in order to avoid the possibility of sewage or other contaminants entering the State waters from liveaboard boats. The upland facilities will include restrooms, and signs should be appropriately placed on the piers to advise boaters and boat owners and operators of the availability of restroom facilities. The marina will not feature fueling facilities; however, St. Joe will maintain pollution containment supplies and equipment at the marina sufficient to contain any potential fuel or other petroleum spills from catastrophic events, such as the rupture of a boat fuel tank. Expert witnesses for St. Joe established that a "management and operational plan" designed to enforce the provisions enumerated above will be enacted by the applicant. The management and operational plan includes three mechanisms of enforcement: Warning signs. Boat-slip lease agreements which must incorporate all restrictions found to be necessary herein. These will contain an enforcement provision providing for mandatory eviction from use and lease of the marina facilities for any breach of those conditions by lessees or their guests. Management personnel will be employed on the marina property to enforce all restrictions and conditions designed to insure environmentally-safe operation and maintenance of the marina, and such personnel should be employed during all operating hours of the marina, not just during daylight hours, as proposed by the applicant. Signs will be posted at conspicuous locations at the marina and at the upland facilities of the Yacht Club informing boaters of the marina rules and prohibitions. The signage will be visible to Yacht Club members and their guests using the marina, and members' guests will be required, upon mooring at the marina, to register and to review the rules and prohibitions. Boat-slip lease agreements at the marina will incorporate these marina rules and prohibitions. Under the lease agreements, a violation of the marina rules or prohibitions by a member or guest will be considered a breach of the lease and will result in revocation of the lease and removal of the member's boat from the marina. A dock master will be employed at the marina to supervise the operation and maintenance of the marina and will be assisted by dock hands and other personnel in order to see that the conditions and restrictions referenced herein are enforced. The applicant has proposed such personnel being employed during daylight hours. However, in order to insure that the standards for operation and maintenance of the marina and boats using it will be enforced so as to avoid water-quality violations and violations of the public interest parameters delineated below, the permit grant should be conditioned upon such personnel being employed during all operating hours of the marina, whether daylight hours or not. If this is accomplished, the enforcement mechanisms outlined in the management and operational plan will reasonably insure enforcement of the marina's rules, prohibitions and conditions on any grant of the permit and likewise reasonably insure that water-quality and public interest standards are not violated. Upland Facilities The upland and Yacht Club facilities to be developed in conjunction with the marina will be located on approximately seven acres adjacent to the marina site. The Yacht Club and related facilities will include a clubhouse, parking, and a storm water treatment system which will serve the upland facilities. St. Joe has obtained a conceptual permit for the management and storage of surface waters for the proposed upland improvements, including the Yacht Club. It will also seek a permit for the storm water treatment system, itself. St. Joe, through its consultants, has investigated and opined that the installation of the proposed upland facilities are feasible and can comply with applicable regulatory criteria and is pursuing the necessary permits and approvals from local governments and state agencies. It will insure that all such is accomplished prior to initiation of construction of the Yacht Club facilities. The precise configuration and design of all upland facilities will be dictated by applicable local ordinances and the requirements of State regulatory agencies. Marina Impacts The applicant/Respondent and the Petitioners are in essential agreement, through the testimony of their witnesses, regarding the general potential impacts which may be posed by marinas in a general sense, when located in proximity to environmentally-sensitive areas. Concerning anticipated impacts of this marina at the subject site, however, St. Joe presented the testimony of three expert witnesses, as well as a hydrographic study. It was thus established that violations of the pertinent water-quality statute and rules and the public interest standards contained in the statute referenced herein will not be violated. The Petitioners, although presenting both lay and expert testimony regarding the water quality and habitat type and quality in the general area of the site and the general impacts that can be caused by marinas in such areas, presented no expert testimony or studies regarding the anticipated impacts of this particular marina, as designed and configured by the applicant, on the subject site and aquatic habitat. Water Quality Considerations Marinas are potential sources of pollutants which may adversely impact water quality. Different sources at a marina may generate different pollutants; and in this case, testimony addressed these potential pollutant impacts. The totality of the expert testimony taken at hearing establishes that the marina will not likely cause a violation of applicable water-quality standards. One witness for the Petitioners, Bill Watkins, was accepted as an expert in water quality. In describing potential impacts of the marina, however, he only opined that there "could be some effect on water quality"; however, he did not specifically establish adverse effects on water quality which could be anticipated or reasonably expected regarding violations of applicable standards. Mr. Watkins acknowledged: "As to whether or not that degree of pollution, and that's what we're talking about, degree of impact, would be something that would be, have a significant degradation effect, I could not answer without further site specific studies." Mr. Watkins further described the type of site specific information which would be required for him to make a proper assessment of water-quality impacts, including hydrographics and the nature of the sediments existing at the site. Other witnesses for the Petitioners similarly declined to opine regarding violations of the water-quality standards because site specific information was not available to them. Dr. DeMort, for example, explicitly declined to offer an opinion regarding water-quality violations. The opinions and testimony of the expert witnesses on water quality presented on behalf of St. Joe, as well as by the Department, are accepted in establishing that no water-quality violations by the construction and operation of the marina are anticipated. The reasonable assurance that water-quality violations will not occur through the construction and operation of the marina is illustrated by the unrefuted evidence concerning the hydrographics by which the site is characterized. A knowledge of site hydrographics is necessary to accurately determine potential water-quality impacts. A hydrographic study was prepared by St. Joe through the auspices of its consultant, Olsen Associates Incorporated. The experts who prepared that study testified on behalf of St. Joe at hearing, and a Department witness who reviewed the study testified by deposition. None of the Petitioners' expert witnesses addressed the subject of site hydrographics other than to note that they were an important consideration. Mr. Buckingham was accepted as an expert witness in the area of marine engineering with emphasis on hydrographics. He testified regarding the hydrographic study prepared and submitted by St. Joe. The study involved the collection of data at the site, including the gauging of water surface elevations over a two-day period in December of 1988; the comparison of those elevations to predicted elevations based upon historical data; a measurement of current velocities at the site; a dye study to assess the flow regime at the site; and the gathering of depth soundings and sediment samples to confirm the bathymetry and nature of bottom sediments at the site. The hydrographic study also involved the analysis of the data collected at the site. Hydrographics at the site are composed of two components, the transport of a pollutant by advective currents and the dispersion or diffusion of a pollutant within the water column. The physical transport by advective currents dominates the hydrographic circumstance prevailing at the marina site. A pollutant introduced at the site is more likely to be physically transported away from the site, in addition to being merely dispersed through the water column at the site. This is because of the relatively high current velocities prevailing. Both the transport and dispersion components were analyzed in the study to determine the time and distance necessary to reduce an initial concentration of a hypothetical pollutant to 10% of its initial concentration. A pollutant introduced at the site would be reduced to 10% of its initial concentration in less than seven minutes and within 400 feet of the site on the ebb tide and within 300 feet of the site on the flood tide. Moreover, the "plume" of this hypothetical pollutant would occur in a longshore direction parallel to the shore, as opposed to a direction toward the shore and would be of comparatively narrow width (approximately 30 feet). The hydrographics of this site are such that a complete water exchange will occur in 20 to 30 minutes at any point during the tidal cycle. The evidence thus demonstrated that the site is extremely well flushed by tidal currents. In his deposition, Ken Echternacht, of the Department, testified that data in the hydrographic study was realistic in his experience and that he had no questions or concerns regarding the data and methodology used to confirm that data. In addition to Mr. Buckingham's testimony and the study, itself, the testimony of Dr. Echternacht established that flushing is of no concern and is thoroughly adequate at the site. Dr. Echternacht is the Department's hydrographic engineer, whose function is to review all dredge and fill permit applications which may have impacts upon the hydraulics of surface water systems. He has reviewed approximately 1,500 dredge and fill permit applications. His testimony and that of Mr. Buckingham is accepted, as is that of other Department expert witnesses in establishing the excellent flushing characteristics of the site and that the construction and operation of the marina will not adversely affect the present hydrographic situation at the site, as that relates to establishing that no water quality violations will occur. All marinas are potential sources of pollutants. The first to be addressed involves the installation of the pilings themselves during the construction of the marina. This is a potential source of turbidity. Turbidity involves the suspension of bottom sediments and substrate material in the water column, which can pose, among other problems, the retardation of light penetration through the water column which can have an adverse impact on photosynthesis in marine grass beds. In extreme cases, it can cause the destruction of grass beds through killing of the grass by lack of adequate light penetration, as well as the smothering effect of sediments being deposited upon grasses. The method to be used by St. Joe in installing the pilings will be by "jetting" them into the bottom of the river initially and then driving the pilings into the river bottom to the required depth to support the piers. Witnesses for St. Joe and the Department established that this method will constitute an adequate safeguard to be employed during construction to minimize any turbidity. Any temporary or local turbidity caused by the installation of the pilings will be transitory and will pose no significant water-quality violation; however, turbidity curtains will, be employed, if necessary, by the applicant to control any such turbidity during construction. Another potential source of turbidity at a marina involves the dredging, washing or disturbance of the river bottom caused by boat propellers or boat keels. The evidence demonstrated that the risk of such "prop dredging" or wash at this marina will be negligible due to the design features and conditions at the site, including the channels and channel markers, and particularly by the depth of waters prevailing at the site. The marina basin and boat slips are located in water of sufficient depth to prevent prop dredging or wash. The =average depth of the entrance channels is between 10 and 12 feet. Maneuvering within the marina basin will occur in depths of 10 feet or greater. Although the most landward boat slips are located in depths of approximately eight feet, the average depth within most slips is approximately 10 to 12 feet. These depths are based upon the bathymetric survey of the site and confirmed by random soundings performed during the course of the hydrographic study in evidence. Further, these depths are "mean low water" depths. Mean low water reflects the "lowest expected level" within a 29-day tidal epic. The "mean lower low" level is the lowest expected level over the course of a year. That level prevailing at the site, according to the study, is 0.1 feet lower than mean low water. The maximum draught of boats expected to be moored at the marina is 4.5 feet. Thus, the depths in the marina will allow ample clearance between propellers and keels and the river bottom. The required clearance between boat bottoms and propellers and the river bottom can further be assured by proper placement of boats in the boat slips in the leasing process and in the assignment of boat slips to casual, temporary users of the marina. In other words, the larger boats will be assigned to the deeper, more waterward slips. Other measures include warning signs, which should be placed along the six-foot depth contour, along the landward edge of the entrance channels and beyond the waterward extent of the grass beds. This will insure that boaters do not stray into shallow-water, aquatic habitat areas. A second factor in determining the potential for prop dredging at the marina is the nature of the sediments themselves. Four witnesses, including those testifying for the Department and for the Petitioners, established that the sediments at the site are primarily sand-based, with minimal organic silt content. The sandy nature of the sediments minimizes the potential for turbidity caused by prop dredging or prop washing (hydraulic currents created by propeller operation) because sand, by its density, mass and weight, tends to settle out to the bottom much quicker if it is suspended in the water column. Even if prop dredging did occur at the marina, generating turbidity, the high flushing characteristic of the site would quickly transport and disperse any such turbidity and render it undetectable and likely prevent its deposition on the grass beds. A potential source of pollutants at a marina is boat fuel. Expert witnesses for the Department and the applicant established that the design and operational features of the marina, primarily the absence of any fueling facilities, will minimize or eliminate the potential for pollutants generated by fueling operations. Another potential source of pollutants at a marina is waste from boat heads and bilges generated by flushing boat heads or pumping out of bilges with bilge pumps. Expert witnesses for St. Joe, as well as the Department, established that the design and operational features with which this marina will be characterized will minimize or eliminate the potential for such pollutants to be generated because liveaboard boats will be prohibited, and the pumping out of heads and bilges will also be prohibited because of the conditions agreed to by the applicant for a grant of this permit. Another potential source of pollutants at a marina is the use of anti-fouling paint used on the bottoms of boats and the periodic scraping and repainting of boats. Expert witnesses for the Department and the applicant established that the operational features and design of this marina will minimize the potential for pollutants from this source because boat painting, sanding, and scraping and other operations attendant to boat painting will be absolutely prohibited at the marina. Finally, another potential source of pollutants would be trash and garbage materials. The potential for pollution from this source will be minimized by the use of trash containers and dock boxes located at frequent intervals around the piers and boat slips, as well as the instructional signs to be placed on the piers and slips by the applicant and the publication of marina rules in order to inform boat operators and guests of the necessity to dispose of trash in the proper containers. It has thus been established that the design and operational characteristics of the marina and conditions to be imposed thereon will minimize or eliminate the potential for pollutants to be generated and placed in the surface waters at the site. The marina will not occasion violations of applicable water-quality standards. Any pollutants which might be deposited in the surface waters at the site will be quickly transported and dispersed so as to be undetectable at the marina or in the vicinity of the marina because of the critical role played by the hydrographics prevailing at the site. Public Interest Impacts Much of the testimony at hearing regarding impacts upon the various public interest standards, including wildlife and habitats, focused upon the grass beds, and the benthic communities prevailing in deeper water at the site, as well as the fact that the site is used by manatees. Dr. Quinton White was accepted as an expert in biology and biological impacts of marina construction and operation. He testified on behalf of the applicant. His testimony and that of other expert witnesses offered by St. Joe and the Department established that there would be no adverse impact on benthic communities and organisms, including manatees, caused by the construction and operation of the marina. The Petitioners called expert witnesses on the issue of impacts on wildlife. Mike Allen, a Florida Game and Fresh Water Fish Commission staff member, testified that he was not really qualified as an expert in fisheries or benthic communities but, rather, in terms of terrestrial species which are not involved in this proceeding. Lawson Snyder, another Florida Game and Fresh Water Fish Commission staff member, was accepted as an expert in fisheries biology on behalf of Petitioner but testified that the marina's impacts upon fish and wildlife would not be detectable. Jim Valade, a Florida Department of Natural Resources staff member, was also accepted as an expert in marine biology, including fish and manatees, but testified that the permit applicant has taken steps to protect manatees in virtually all aspects and that his department's concerns regarding the safety of manatees have been adequately addressed by the design and proposed operation of the marina. Bill Watkins, a St. Johns River Water Management District staff member, was accepted as an expert in biology, but testified that the design of the marina provides the grass beds "a fair degree of protection" and declined to opine that the marina would have any adverse impacts upon wildlife or fish. Finally, Dr. Carol DeMort, in her deposition, specifically declined to render any opinion regarding adverse impacts upon wildlife or fish. Thus, the evidence adduced by the Petitioners at hearing did not rebut the evidence introduced by the applicant that the marina will have no detectable impacts upon wildlife or habitats involved in the vicinity of the site St. Joe introduced evidence concerning impacts from shading upon grass beds by the marina structures themselves and from turbidity "washed" onto, the grass beds by motorized boats maneuvering in the marina basin. Expert testimony was adduced that established that shading caused by the widest pier, that is, the main pier with a width of 12 feet, would have no adverse impact on the grass beds due to shading. That testimony was unrebutted and is accepted. Two expert witnesses for St. Joe, a marine engineer and a biologist, as well as a Department witness, established that, even assuming that turbidity was generated by propeller action in the marina basin, the turbidity resulting from prop wash would not be transported 275 feet from the marina basin offshore to the :grass beds at the inshore area. They attributed those opinions to the nature of the sediments involved which are not readily suspended, the flushing at the site, the distance between the basin and the grass beds, and the typical extent of prop wash from boats expected to be used at the marina. The Petitioners presented two witnesses, who testified regarding the impacts of prop wash. Mr. Allen, an expert in upland terrestrial species, testified regarding the potential for deposition of sediments on grass beds but also acknowledged that the hydrographics at the site, the distance between the marina basin and the grass beds and other protective measures would minimize this potential. One lay witness for the Petitioners testified to the effect that if a "handful" of boat owners in the marina violated the "no wake" restrictions and accelerated their boats in violation of those restrictions, they would cause turbidity to be placed upon the grass beds. His testimony was contradicted, however, by a marine engineer, who testified that prop wash is a function of many parameters (e.g., the RPM of the engine, the horsepower of the engine, the draught of the boat, and configuration of the propellers, etc.). He established that it would not be reasonable to expect prop wash extending twice the length of a boat. Regarding impacts upon benthic communities at the site, the applicant introduced expert testimony which established that the benthic communities in that vicinity of the marina, including the grass beds, fin fish, shellfish, and other organisms, will not be adversely impacted by the construction and operation of the marina in light of the safeguards which would be imposed upon the permit, as delineated herein. This is primarily due to the absence of significant concentrations of pollutants to be expected and the hydrographics prevailing at the site as that relates to the unlikelihood of boat grounding, prop dredging, and prop wash suspending pollutants and turbidity and depositing them on benthic community habitat areas. Only one of Petitioners' witnesses, Dr. DeMort, testified in her deposition concerning potential impacts upon benthic communities. Dr. DeMort made it clear, however, that she had conducted no investigations and studies necessary to enable her to render an expert opinion on the impacts upon the benthic communities prevailing at the site which might be caused by the marina's construction and operation. Her testimony in this regard only related to marina installation and operation in general and was not related to the specific design characteristics and proposed operational parameters of the subject marina. Manatees are an endangered species. There is much concern about their welfare with regard to the proposed project because all parties acknowledge that the site and the shoreward grass bed areas, particularly, are frequented by manatees, particularly for summer foraging. Manatees tend to forage in shallow waters and associated grass beds. Boats pose definite hazards to manatees and cause significant manatee deaths each year due to impact from boats, as much as 15% to 30% of the known population. In response to this hazard, the U.S. Marine Mammal Commission has recommended that grass beds be protected and that establishment of protective or "no wake" zones in manatee foraging areas be accomplished. In light of such restrictions voluntarily agreed to by St. Joe and its expert testimony in this regard and in light of the manatee education and awareness measures proposed by the applicant, it has been demonstrated that the marina will not have any negative impact on the manatee population in the area. The Petitioners' only expert witness concerning manatees, Jim Valade, indeed, opined that the marina had taken steps to protect manatees "in virtually all aspects". In this connection, the design features in the management and operational plan discussed herein and proposed by the applicant embodies measures to address potential impacts upon manatees which frequent the marina site. These include manatee awareness signs to be posted at the marina; and an additional specific condition has been agreed upon by the Department and the applicant which specifies the size, lettering and other details of the warning signs, and the location of them within the marina, all of which will be included in a plan to be submitted to, reviewed, and approved by the Florida Department of Natural Resources. Additionally, a permanent educational display will be located at the Yacht Club informing boaters who frequent the facility of the presence of manatees in the area and the need to minimize the impact of boats upon manatees. During construction, if a manatee is sited within 100 yards of the marina site, construction activities will cease and not resume until manatees have left the area. A handbook will be prepared concerning manatees and the effect on them of boat operation, which will be distributed to employees of the facility and to Yacht Club members and guests. This requirement and the review of it by Yacht Club members and guests will be an integral requirement in the terms of the slip leases. Additionally, no docking facilities, pilings or cleats will be located along the portions of the piers not containing boat slips in order to discourage boaters from attempting to moor at those locations, which will reduce the number of boats frequenting the marina, as that relates to manatee safety. This portion of the St. Johns River functions as a highly productive juvenile fish nursery and sports fishing area. Therefore, an examination of the marina's potential impacts upon marine productivity, fishing and recreation in the area is an important consideration in this proceeding. The discussion of this potential impact involves the same issues discussed in connection with impacts upon water quality and wildlife habitat; namely, the generation of pollutants and the impacts upon the grass beds and benthic communities directly by boat operation itself. Unrefuted testimony adduced by the applicant and the Department has established that impacts upon the fish population and upon marine productivity, fishing and recreational values will not be adverse. No deliterious effect is likely to be occasioned the fisheries and fish habitat and the habitat of other aquatic organisms in terms of juveniles or adults or to the sport fishing values of the area in which the marina will be located. Indeed, the marina structures and the shade and concealment offered by moored boats will provide additional habitat for juvenile fish, as well as provide an additional source of food because of the "fouling communities" of life forms which will be expected to grow on the pilings. These will serve as food for juvenile fish and some species of adult fish which, in turn, will enhance the food supply of predatory fish operating at an upper level in the food web. The boats and structures themselves also will operate as a source of protection for certain fish populations from predators. The Petitioners produced a fisheries biologist as an expert witness, who testified in this regard; but he acknowledged that he did not know whether noticeable impacts on conservation of fish, marine productivity and recreational values will be caused by the installation and operation of the marina. He testified in a general sense that he feared some negative impacts might result but did not feel that any such impacts would be detectable based upon testimony he heard and deferred to, including testimony that the littoral zone would not be impacted by the marina to any significant degree. He ultimately opined that the marina would likely have little impact on sports fishing. The other witness produced by the Petitioners concerning impacts upon fishing and recreational values was unable to render any expert opinion, by her own admission, because she had conducted no studies or otherwise been provided information regarding the design and proposed operation of the marina. Consequently, the testimony adduced by the applicant as to these parameters is accepted; and it has been established that the marina will not adversely impact fisheries, fish conservation, aquatic habitat, sport fishing, recreational values and marine productivity in the area involved at the project site. Regarding potential impacts upon the public health, safety and welfare and property of others, the applicant and the Department adduced expert testimony that no adverse impact regarding these interests will occur. The testimony of Petitioners' experts similarly establishes that the marina would not pose safety hazards or would otherwise give rise to any noticeable impacts upon the public health, safety, welfare and property of others. Regarding potential impacts upon navigation or the flow of water, St. Joe and the Department introduced expert testimony to establish that the marina would not adversely impact navigation or the flow of water, and it is so found. The Petitioners' introduced no evidence regarding this subject. Regarding potential impacts upon significant historical and archaeological resources, the applicant and the Department introduced evidence that no adverse impact as regards these resource parameters will occur. Although one of the Petitioners, in her testimony, speculated that the marina could "detract" from the William Bartram scenic highway, she was unable to specify how the marina would impact the highway or to what extent the highway was a significant, historical or archaeological resource. It is found that no such adverse impact on the William Bartram scenic highway will occur. Cumulative Impact Regarding cumulative impacts, the applicant and the Department introduced evidence that the marina would not give rise to impacts which, cumulative with the impacts of other marina facilities, would be significant. The evidence establishes that there are six marinas within four miles of this marina site; two upriver, and four downriver. Due to the hydrographic circumstances in the area and the distance of the other marinas from this site, it has been demonstrated that the addition of this marina to the area will not result in any adverse cumulative impacts. Mr. Mike Allen, the expert in upland terrestrial species (not involved in this proceeding), referenced in his testimony the cumulative impacts he feared on sports and commercial fishing. Mr. Allen made it clear, however, that his reference was not to cumulative impacts caused by the marina and existing marinas but, rather, to impacts which could be brought about by many such future facilities located in this particular area. The evidence does not reflect, however, that any other marinas are conceptually contemplated or are the subject of other permit applications for this area for the future. It is thus found that no significant adverse cumulative impacts will be occasioned by the installation and operation of the subject facility.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is therefore, RECOMMENDED that the application of St. Joe Paper Company for the dredge and fill permit at issue be granted, provided that the terms and conditions enumerated in the Department's Intent to Issue, in evidence as St. Joe Exhibit 9, and accepted by the applicant, as well as those conditions found in this Recommended Order to be necessary and supported by the evidence, are incorporated in the permit as mandatory conditions. DONE AND ENTERED this 26 day of October, 1990, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29 day of October, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 89-5053 Applicant's/Respondent's Proposed Findings of Fact 1-53. Accepted, but are subordinate to the Hearing Officer's Findings of Fact on the same subject matter, particularly in those several instances where conditions on the grant of the permit have been recommended to be modified somewhat by the Hearing Officer in light of the totality of the preponderant evidence presented. Rejected, as unnecessary. Accepted. Respondent DER's Proposed Findings of Fact The Department submitted no proposed findings of fact but, rather, adopted those submitted by the applicant/Respondent. Petitioners' Proposed Findings of Fact Petitioners, Hoffert, presented no proposed findings of fact but, rather, a letter in the nature of final argument which has been referenced and discussed in the above Preliminary Statement to this Recommended Order. Petitioners, Cornwell, submitted a post-hearing pleading; but it contained no specific, separately-stated proposed findings of fact, which can be separated from their mere recitation and discussion of testimony in evidence and arguments such that coherent, specific rulings could be made. Petitioners, Cornwell's post-hearing pleading did not conform to the instructions given to them by the Hearing Officer at the conclusion of the hearing concerning the appropriate manner for submission of proposed findings of fact, and they were submitted late. They have been considered in the rendition of this Recommended Order, however, in spite of the fact that they were filed in a tardy fashion. COPIES FURNISHED: Dale H. Twachtmann, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, Esq. General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 T. R. Hainline, Jr., Esq. ROGERS, TOWERS, ET AL. 1300 Gulf Life Drive Jacksonville, FL 32207 William H. Congdon, Esq. and Joanne Barone, Esq. Department of Environmental Regulation Twin Towers Office Building Room 654 2600 Blair Stone Road Tallahassee, FL 32399-2400 Barbara Davis Winn 3448 State Road 13 Jacksonville, FL 32259 Mary and Irv Cornwell 2652 State Road 13 Switzerland, FL 32259
Findings Of Fact The Petitioner is the adjoining neighbor of Harrie E. Smith, the applicant, and runs the Coral Lagoon Resort. This is a commercial establishment which consists of rental units fronting on Bonefish Bay with an interior canal and a series of small boat docking facilities which give each unit docking space and water access. The Petitioner keeps two tame porpoises at the end of this canal which are a tourist attraction. The Petitioner's operation is tourist oriented particularly to those who come to the Keys for fishing or diving excursions. The application to the Department of Environmental Regulation is to the installation of a wooden dock which runs parallel to the Petitioner's northern boundary line. The applicant, Mr. Smith, runs a commercial boat repair facility alongside Mr. Goss' establishment and it is clear there have been misunderstandings between them in the past. The dock has been installed and as noted above, the application to the Department of Environmental Regulation is for an after-the-fact authorization. The department has indicated it intends to grant the permit as it does not see that the dock will degrade water quality or create a condition adverse to the public interest. The petition maintains that the dock will cause water quality problems in that it will encourage the docking of boats which will spill oil, gas and other contaminants into the waters and thereby degrade water quality. It should be noted that the Petitioner maintains extensive docking facilities in his establishment and could be subjected to the same argument.
Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: This controversy began on July 9, 1990, when petitioners, David and Victoria Page, filed an application with the district office of respondent, Department of Environmental Regulation (DER), seeking the issuance of a permit authorizing certain construction activities (including the erection of a seawall) on their residential lot located at 3108 Gulfwinds Circle, Hernando Beach, Florida. The property faces west on the Gulf of Mexico, a water body designated as a Class III water in the State. The application was eventually deemed to be complete on October 24, 1990. After conducting a review of the application and an on-site inspection of the property, on January 18, 1991, DER issued its notice of permit denial. The notice identified the reasons for the denial as being petitioners' failure to give reasonable assurances that water quality standards would not be violated and that the project would be in the public interest. Also, DER cited expected adverse cumulative impacts if the application was granted. The notice provided further that if petitioners agreed to locate their seawall landward of the jurisdictional line, the project would be approved. In July 1991, petitioners amended their application to propose that the seawall be constructed even further seaward of the jurisdictional line. When efforts to resolve the case were unsuccessful, petitioners requested a formal hearing on January 17, 1992, to contest the agency's decision. Petitioners purchased their property in 1989. It lies within Unit 2 of Gulf Coast Retreats, a residential subdivision in Hernando Beach, Florida. The property is identified as lot 20 on Gulfwinds Circle and fronts the Little Pine Island Bay (Bay), which is a part of the Gulf of Mexico. Access to the Gulf is provided by a channel (six feet in depth) in the Bay in front of lot 20 and which eventually runs into the Gulf several miles south of petitioners' lot. It is undisputed that in 1985 Hurricane Elena passed offshore causing erosion to lot 20 and other adjacent lots. Consequently, the upland portion of the lot is now smaller than before the hurricane. However, petitioners purchased their property in that state of condition. Lots 19 and 21 are on the south and north sides of petitioners' property and are owned by the Steins and Budricks, respectively. Both neighbors have constructed vertical concrete seawalls in front of their homes. Budrick was issued a permit to construct a seawall on December 28, 1989, while Stein constructed his without a permit. However, Stein has subsequently filed an after-the-fact permit application and was recently advised by DER that the application was complete. At hearing, a DER representative expressed the view that the Stein application will probably be approved since his wall is landward of the DER jurisdictional line. It is noted that the Stein and Budrick seawalls sit back from the original property lines because of the erosion suffered during the 1985 hurricane and correspond to the jurisdictional line established by DER on their property. Another application for a permit to construct a seawall was filed by the owner of lot 18 in March 1992. Like Stein and Budrick, that owner proposed to construct his wall on the landward side of the jurisdictional line. Petitioners, who live in Kansas, desire to construct a home on their lot. They have proposed to place one hundred cubic yards of fill (limerock) on 1,065 square feet of intertidal wetlands on the western end of their lot and construct a 110-foot vertical seawall up to thirty feet seaward of the jurisdictional line. Thus, there will be dredge and filling activities in the Gulf of Mexico, a class III water of the state, thereby invoking the jurisdiction of DER. By law, DER is required to establish a jurisdictional line to show the landward extent of waters of this state, including the Gulf of Mexico. Such extent is normally defined by species of plants or soils which are characteristic of those areas subject to regular and periodic inundation by the waters of the state. As a general practice, using a prescribed plant or species indicator list, DER makes an on-site inspection of the property to determine what vegetation, if any, is found on the property and is subject to regular and periodic inundation by the waters. In this case, the dominant vegetation found on lot 20 was paspalum distichum, a plant on the species list subject to regular and periodic inundation by the Gulf waters. Accordingly, DER observed where the vegetation ended and used that point for the placement of the jurisdictional line. As a cross check, DER also noted the rack line, which is indicative of the landward extent to which the high tides rise, and found it to correspond to the vegetation line. It should be noted that the jurisdictional line established on petitioners' property corresponds with the line drawn on lots 18, 19 and 21, and if that line is used to construct the seawall on lot 20, the seawalls on all four lots would run in a straight line. Although petitioners objected to the jurisdictional line as established by DER, they offered no credible evidence to show that it was improper or should have been placed at a different location. On January 9 and 15, 1991, Richard W. Pugh, a DER field environmental specialist, conducted an on-site inspection of the property and adjacent waters. He also was responsible for establishing the jurisdictional line. Finding numerous adverse environmental effects that would occur if the permit was granted as proposed, Pugh recommended that the application be denied. This recommendation was accepted by the deputy assistant secretary for DER's Southwest District Office and a notice of permit denial was accordingly issued. The bases for the denial were that (a) reasonable assurances had not been given by petitioners that water quality standards would be satisfied; (b) a cumulative adverse impact on the area would occur if the permit was approved, and (c) petitioners had failed to give reasonable assurances that the project was in the public interest. In order to prove entitlement to a permit, petitioners must give reasonable assurance that water quality standards will not be violated and that the project is in the public interest. In this respect, they offered no evidence to provide these assurances. This in itself supports a finding that no entitlement to a permit has been shown. Even so, the agency elected to present evidence on these issues after petitioners' case-in-chief was concluded. Findings of fact drawn from that evidence are set forth below. On April 6, 1992, a DER marine biologist, Dr. George H. Farrell, visited the site and conducted a biological evaluation of the composition of the benthic community in the intertidal and subtidal wetlands which would be impacted by the project. Based on his tests and observations, Dr. Farrell concluded that the project as proposed would have an adverse impact on marine and wildlife resources in the area. This is because the area has very good water quality, contains a high species diversity, performs an integral part in the food web, and serves a valuable nursery function for estuarine dependent juvenile fish species and a corridor function for migrating estuarine dependent fish species. This testimony was not challenged by petitioners and is hereby accepted. 1/ In granting or denying a water resource permit, DER is also required to consider certain statutory criteria found in Subsection 403.918(2), Florida Statutes, to determine whether a project is in the public interest. Although petitioners did not address these criteria, and thus failed to give any assurances that the project is in the public interest as required by law, testimony adduced by DER established that under petitioners' proposal, there will be a permanent loss of 1,065 square feet of intertidal wetlands due to filling activities. These wetlands are now used by fish and wildlife habitat and will no longer be available for use. In addition, the same area is used as a nursery area by a variety of fish species. As such, the project will adversely affect the conservation of fish and wildlife and their habitats and will adversely affect the fishing values and marine productivity in the vicinity. Second, because petitioners' proposed seawall will jut out from their neighbors' walls by as much as thirty feet, and the corners of the seawall in that configuration will result in erosion or shoaling depending on whether the waters are moving north or south, the project will cause harmful erosion or shoaling. Third, because the wall is being constructed of concrete and steel and is not temporary, the project will be of a permanent nature and thus have a permanent adverse impact. Finally, the ecological functions being performed in the immediate vicinity of the project are extremely important and the elimination of this zone will significantly impair those functions. Collectively, these considerations support a finding that the project is not in the public interest. DER has a policy of not granting a permit if adverse cumulative impacts may be expected as a result of granting that permit. This policy is derived from a statute (s. 403.919, F.S.) requiring such impacts to be considered in the permitting process. In the case at bar, DER reasonably predicts that if it granted petitioners' application and authorized them to construct a seawall which jutted out up to thirty feet beyond their neighbors' walls, it would be obligated to grant similar permits to property owners on adjacent lots. Because petitioners' application will have an adverse impact on the water quality and is contrary to the public interest, the granting of additional permits would exacerbate those impacts. When an applicant proposes to fill (destroy) wetlands, and the applicant is unable to meet the public interest criteria set forth in subsection 403.918(2), DER shall consider measures proposed by or acceptable to the applicant to mitigate the adverse effects caused by the project. In this case, no mitigative measures were proposed by petitioners. At hearing, petitioners' representative asserted that in June 1991, the Cabinet (presumably sitting as the Board of Trustees of the Internal Improvement Trust Fund) implemented a new "policy" which allows property owners to "recover and bulkhead" land previously lost due to avulsion and erosion. He further represented that such requests were to be filed within five years after the event (hurricane). Although petitioners were not the property owners when the event occurred, and more than five years has elapsed, in July 1991 petitioners filed a request with the Department of Natural Resources (DNR) to reclaim and bulkhead their property and that request remained pending as of the date of hearing. A copy of the policy itself (or rule, if any, implementing the policy) was not made a part of this record. Even so, there was no evidence to establish that the granting of that application would require DER to grant a water resource permit, and DER takes the position that the request has no bearing on the issue of whether a water resource permit should be issued to petitioners.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered denying petitioners' application for a water resource permit. DONE and ENTERED this 27th day of April, 1992, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of April, 1992.
Findings Of Fact Respondent/applicant, James L. Carpenter (applicant or Carpenter), is the owner of upland property bordering on and contiguous to a man-made lagoon in Vaca Key near Marathon, Florida. The property is also adjacent to an artificial man-made canal which connects the lagoon to the open waters of Florida Bay. The lagoon and canal are classified as Class III waters of the State while Florida Bay is a Class III Outstanding Florida Water. A more precise location of the property is Section 9, Township 66 South, Range 32 East, Monroe County, Florida. By application dated June 23, 1987 applicant sought the issuance of a dredge and fill permit from respondent, Department of Environmental Regulation (DER), authorizing the construction of an "L" shaped 125'x8' commercial dock with a 10'x8' access walkway waterward of mean high water (MHW) in the canal. The dock and walkway will be located on the property described in finding of fact 1. According to the application, Carpenter owns several "landlocked residences" in the vicinity of the proposed dock and desires to provide dockage for residents who rent his houses. Because of DER concerns that shading might affect photosynthetic capabilities in the vicinity of the project, applicant agreed to revise his application. This revision was made on December 21, 1987 and reduced the dock size to 102'x6' while the access walkway was increased slightly to 12'x8'. Thus, the dock will extend eight feet into the canal beyond the MHW. On January 5, 1988 DER's district office issued an Intent to Issue a permit subject to seven specific conditions incorporated in the permit. This prompted the filing of a petition by petitioner, Lillian Berdeal (Berdeal), who owns upland property bordering on and contiguous to the lagoon, canal and Florida Bay. She operates a commercial seafood business directly across the canal from Carpenter. According to her petition, Berdeal asserts that Carpenter's dock would adversely affect navigation in the canal and the health, safety and welfare or the property of others. The water body in question is a man-made canal facing to the north and providing an outlet for the lagoon to Florida Bay. The lagoon, which measures approximately 150'x100', is fairly well developed. On the east and southeast side of the lagoon lie an outdoor restaurant and Carpenter's boat rental business. Petitioner's seafood processing operation lies on the west and southwest sides of the lagoon and lagoon entrance. Photographs of the area have been received in evidence as DER exhibits 1 and 2 and petitioner's exhibit 1. Presently, there are five finger piers (docks) in front of Berdeal's property at the narrowest point of the canal. These piers are directly across the canal from Carpenter's proposed dock addition. They extend out eight feet perpendicular to the shoreline and are now used by commercial fishermen for docking purposes while using Berdeal's facility. Approximately thirty or forty boats use the finger piers during fishing season (August - May) while up to twenty may use them in the off-season (June - July). Berdeal described those boats as ranging from thirty to forty-five feet in length and having beams up to, but not exceeding, sixteen feet. However, vessels at petitioner's facility on the day of DER's inspection had an average beam of ten feet. The evidence is conflicting as to the canal's width at its most narrow point. According to DER's expert, the minimum width is seventy-six feet, and this figure is accepted as being more credible than Berdeal's own measurement of sixty-three feet. If the project is constructed, Carpenter's dock, together with a boat having a ten foot beam, would use around eighteen feet of the channel at its most narrow width while Berdeal's facility, if used by the largest boat, would take up another twenty-three feet. This would still leave around thirty-five feet of channel for navigation purposes between the two docks at the canal's most narrow point. According to applicant's expert in navigation, James J. Morrison, who has piloted boats in the area for over thirty years, a boat may safely operate in the canal if it has five feet of water on each side. This margin of safety is sufficient in all weather conditions up to and including a small craft warning. If the project is approved, the necessary margin of safety would be available. It is noted also that there are no significant currents in the canal that would adversely affect navigation, and under normal weather conditions, the canal and basin are easily navigable. Petitioner presented the testimony of a commercial fisherman, Leonard Quasney, who expressed concerns that northerly winds periodically drive aquatic weeds and grasses into the lagoon and canal thereby impairing the ability of a boat to safely operate. These weeds are shown in photographs received as petitioner's exhibit 1. It was Quasney's contention that, coupled with the periodic influx of weeds, the addition of a dock at the canal's most narrow point will make navigation more hazardous. However, this theory was discounted by expert witness Morrison who pointed out that, while it is true that floating mats of weeds affect the ability of a person to handle a boat by making the boat's rudder and propeller action less responsive, they do not affect the ability to navigate the canal. In other words, as long as the margin of safety is available in the canal, the presence of the weeds would not hinder a ship's ability to enter and exit the lagoon. This testimony is accepted as being more credible on the issue, and it is found that the new dock will not create a navigational hazard as a result of the weeds. Berdeal is concerned also that the new dock would make it more difficult for fishermen to access her property and therefore cause economic harm to both her and the fishermen. However, this contention was not substantiated. The parties have stipulated that, with the following special conditions proposed by DER at hearing regarding limitations on commercial use, liveaboards and scraping boat bottoms, all water quality standards will be met: All temporary and permanent use of liveaboard or liveaboard type vessels for residential use is prohibited. All on site fueling activities are prohibited. All major vessel repair, such as hull scraping and painting, with the boat in the water is prohibited. Only private use of the dock is permitted. All double parking or rafting of boats along the dock is prohibited. General conditions common to all dredge and fill permits. The parties have stipulated that the "public interest" criteria in Subsection 403.918(2)(a)2. and 4.-7., Florida Statutes (1987), have been satisfied. In addition, a registered engineer has certified that the dock's construction and use will not have an adverse effect on the public health, safety and welfare or the property of others. Petitioner has applied for the issuance of a permit allowing the construction of additional docks at her facility. If the application is approved, these docks will be used for commercial purposes. The proposed impact of this project, and its cumulative impact on the area, was considered by DER in its evaluation of Carpenter's application. However, conditions to be included in Berdeal's permit will minimize any water quality or navigation impacts of the project, even on a cumulative basis.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the application of James L. Carpenter for a dredge and fill permit be granted subject to those specific, special and general conditions imposed by the agency. DONE and ORDERED this 29th day of August, 1988, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 904/488-9675 FILED with the Clerk of the Division of Administrative Hearings this 29th day of August, 1988.
Findings Of Fact At all times pertinent to the issues herein, the Department was the state agency responsible for the regulation and issuance of dredge and fill permits for waters of the state. Hunt is a real property development company which owns the property in issue located contiguous to Sarasota Bay on the east and an artificial canal, dredged many years ago, located to the south. The property in issue includes submerged lands. Petitioners, Manasota and Manatee are environmental interest associations whose standing as parties hereto was stipulated to by Hunt and the Department. The Rosens are owners of a piece of land at the bayward end of the property located to the south of the artificial canal to the south of the property in issue. On September 2, 1988, Hunt applied to the Department for a dredge and fill permit to construct a dock system four feet wide and approximately one thousand feet in length along the northern edge of the artificial canal. Four access walkways would extend from the existing berm to the north out to the proposed dock. The request also sought permission to trim mangroves to facilitate construction of and provide access to the dock; to place 22 cubic yards of fill to stabilize an existing private road; and to relocate the existing access channel by dredging approximately 700 cubic yards of material. Petitioners do not object to the placement of the 22 cubic yards of fill. During the review process, the Department identified several deficiencies in the proposal which it required be modified before a permit could be issued. Hunt agreed to comply with all of the Department's modifying requirements. As a result, in its amended form the proposal calls for the dock to be reduced in size from 5,080 square feet to approximately 3,800 square feet; access points to be reduced from four to three; the installation of a flushing system consisting of a 30 inch culvert between the west end of the canal and the mangrove swamp to the north to enhance the water quality in the artificial canal; the submittal of historical information to demonstrate the existence of a historic canal which would support maintenance dredging; and the submittal of a mitigation proposal for the seagrasses which would be destroyed by the dredging of a new channel and for the mangroves to be trimmed to facilitate the dock construction. The revised application also sought permission to construct a previously approved (different permit) boardwalk, the mitigation for which has been completed and is apparently successful. This mitigation is located in the northern boundary of the Hunt property. The wetlands area adjacent to Hunt's north property line is a Class II, Outstanding Florida Water, (OFW). The property in issue is located contiguous to Sarasota Bay, a Class II water body designated as an OFW). This portion of the bay is not approved for shellfish harvesting. Sometime between 1951 and 1957, a channel was dredged from the Intracoastal Waterway running generally north and south in the bay, west across approximately 400 feet of bay bottom into what was then a mangrove forest on the east side of Longboat Key. The westernmost 1400 foot extension of that channel into the forest is the artificial canal in issue which receives untreated storm water runoff from Jungle Queen Way, the roadway to the south of the canal. The canal is a Class III water and is not an OFW. Approximately 1,225 feet of the southern shoreline of that canal is seawalled, with approximately 35% of the southern shoreline having mature mangrove trees along it. The entire northern shoreline is vegetated by mature mangrove trees. There is no seawall on the northern shore. The canal varies in depth from less than one foot at points to a maximum of 7 1/2 feet at other points. As a result of shoaling at the canal juncture with the bay, a sand spit has formed, and at low tide, water depth is minimal but allows the passage of shallow draft vessels if their motors are raised. The original channel has silted in to a great degree and has become vegetated by approximately 1,350 square feet of various shoal grasses. It is home to several species of water animal including crown conch, lightning whelk, venus sunray clams, jingle shell, banded tulip snail and common nassa snail as well as supporting a diverse and abundant group of bottom dwelling organisms. The grass beds are fish habitats as well as nursery and feeding grounds and fish species present include some important to commercial and sport fishing. Though the remains of the original channel are often indistinct and difficult to define, the Department, in its analysis of the application for permit, determined from a review of the documentary evidence presented , and it is also found here, that a historic channel exists as described, and is navigable at least fifty percent of the time. As such, the Department concluded that that channel qualified for the maintenance dredge exemption. The Department also concluded that a minimum amount of dredging would be required to clear the historic channel sufficiently to allow boats to utilize it during a full range of tidal conditions. The seagrass beds currently existing in the historic channel would be substantially damaged by a maintenance dredging in the area. Though the Department has no authority to require mitigation for this impact should Hunt exercised its right to maintenance dredge, as an alternative, Hunt proposed to dredge a hook shaped channel curving to the north around that portion of the historic channel which penetrates the grass beds. This alternative site is also located in Class II waters and an Outstanding Florida Water. Dredging at the alternative site would displace much the same amount of material, (approximately 700 cubic yards), and the resultant channel would be approximately the same length, width, and depth overall. The alternative site will cross an area which contains a shoal grass, Cuban Shoalweed, but utilization of this site will have a substantially lesser impact to the overall seagrass population than would dredging of the historic channel. If Hunt chooses to utilize the alternative route, it would have to comply with the Department's mitigation requirements which include transplanting the displaced grass from the alternative channel to another location. The conditions for the mitigation were developed by Department personnel in conjunction with the Department of Natural Resources whose personnel have agreed to participate in the transplantation. Hunt has agreed to undertake additional mitigation planting regardless of whether the transplant is successful. The Department has determined that Hunt's total mitigation program is sufficient to offset the adverse impacts of the proposed dredging. Any sea grasses in the area of the channel will be protected by the installation of signs indicating their location. Speed will be limited by the installation of "No Wake" zone signs, and, in addition, the natural dog-leg in the channel should minimize the impact to adjacent shorelines and reduce the potential for shoaling or erosion. The Department gathered water quality data for the area from 1988. This is consistent with the current statutory and rule criteria which permits the use of data existing in the year prior to application. To supplement this, however, the Department also required that Hunt submit water quality data for the actual project site as a part of the application process. From this input, existing ambient water quality standards were established. To insure that these existing ambient water quality standards within the OFW are maintained during construction, the Department has established a mixing zone and has indicated a requirement for the use of double turbidity curtains. Additional safeguards include limiting dredging to periods of low tide. The Department has concluded that these prosthetic activities will most likely result in maintenance of the water quality standards required for Class II and OFW. Any diminishment of those standards would be of limited duration. The Department was also satisfied that the project would not adversely impact in this area after construction was completed and the facility in operation. In support of this position, the Department relied on evidence tending to show that the design of a culvert proposed for incorporation into the project should significantly improve flushing of the water within the canal. Pollutant loading to the system should be reduced as a result of the biological filtration of the mangrove community which will absorb many of the excess nutrients currently in the canal water, and the removal of suspended solids. Expert evidence on the subject indicates that flushing time, currently estimated at 9 days, will be reduced to less than 4 days. Polluting activities, such as fueling facilities, live-aboards, and major repair and maintenance of boats in the canal will be prohibited. Any pollutants not removed by the natural filtration process described above will, therefore, remain in the canal water for less time than before. If vessels are docked in the canal, the minimal amount of resulting oil and grease pollution should not be sufficient to degrade water quality in either the canal or the bay to a point below acceptable established standards. In fact, such impact should be both non-detectable and non-measurable.. Hunt's plan calls for the removal of approximately 20 of the approximately 2,400 mangrove trees and the trimming of approximately 230 additional ones. Though this trimming, as a part of an exempt activity, is also exempt, and as a result, mitigation in not required, Hunt indicates its intention to plant 3 trees for every tree removed or trimmed, and this proposal, considered acceptable to the Department, has been incorporated as one of the permit conditions. The new mangrove area to be planted in mitigation should be fully established within 3 years of planting and will provide the same beneficial function as the replaced trees. Hunt's mitigation planting for the previously mentioned boardwalk project has been successful. To protect the manatee population as much as possible, the Department has also included conditions to the permit requiring the posting of manatee awareness signs along the canal and channel and the installation of a permanent informational display at the facility. These measures, though no guarantee of compliance by individual boaters, are currently the most effective safeguards short of prohibition of boat activity. The Department has concluded, and it is so found, that, considering the proposed project against the statutory criteria relating to dredge and fill permitting of this nature, the project, as conditioned, is in the public interest and would have no cumulative impact on the environment in the area. When the 36 special conditions attached to the permit by the Department are complied with, the effect on fish and wildlife resources in the area should be beneficial. As a result of the mitigation activities, both mangrove and seagrass populations should be increased and the shoreline enhanced. Water quality in the canal should be significantly improved above existing conditions, and the abandonment of the historic maintenance dredging operation, with its associated impacts, is clearly in the public interest. The incorporation of a permit condition precluding any subsequent maintenance dredging in the historic channel upon completion of the relocation is a safeguard clearly in the public interest. The evidence also indicates, supporting Departmental findings to that effect, that the project will not adversely affect the public health, safety, welfare or property of others; nor will it adversely affect the conservation of fish and wildlife, endangered, threatened or other. It will not adversely affect navigation or flow of water or cause harmful erosion or shoaling. It will not adversely affect fishing or recreational values or marine productivity in the area; nor will it endanger significant historical or archaeological resources which exist currently in the area.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that a Final Order be entered in this case granting a Dredge and Fill permit to Hunt Building Corporation consistent with the terms and conditions outlined in the Department's Intent to Issue, dated March 29, 1990, under file NO. 41-1542543. RECOMMENDED this 3rd day of January, 1991, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of January, 1991. APPENDIX TO RECOMMENDED ORDER IN CASES NO. 90-2350 & 90-2736 The following constitutes my specific rulings pursuant to S 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR PETITIONERS, MANASOTA AND MANATEE: 1. Accepted. 2(a) - (e). Accepted and incorporated herein. Accepted and incorporated herein. Accepted. & 6. Accepted and incorporated herein. Accepted. - 12. Accepted and incorporated herein. Rejected as contrary to the evidence. Accepted. - 17. Accepted and incorporated herein. Accepted. - 22. Not appropriate Findings of Fact. Should be in Conclusions of Law. 23. - 26. Rejected. 27. - 30. Accepted and incorporated herein. 31. - 33. Accepted. Accepted except for last clause. Not a Finding of Fact but a comment on the state of the evidence. Rejected. Not proven. Not a proper Finding of Fact and not supported by authority. Accepted and incorporated herein except that the canal is a Class III water body. Accepted and incorporated herein. Not a Finding of Fact but a Conclusion of Law. Rejected. Accepted. Accepted but not determinative of any issue of fact or law. Ultimate Fact. Rejected. FOR RESPONDENT HUNT Accepted and incorporated herein. & 3. Accepted and incorporated herein. 4. & 5. Accepted and incorporated herein. 6. & 7. Accepted and incorporated herein. 8. - 10. Accepted and incorporated herein. 11. & 12. Accepted and incorporated herein. 13. Repetitive information. 14-1 & 2. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. & 22. Accepted and incorporated herein. Accepted and incorporated herein. - 28. Accepted and incorporated herein. FOR RESPONDENT DEPARTMENT: 1. - 5. Accepted and incorporated herein. 6. - 8. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. - 18. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. & 22. Accepted and incorporated herein. 23. & 24. Accepted. Accepted and incorporated herein. - 31. Accepted and incorporated herein. 32. Accepted and incorporated herein. COPIES FURNISHED: Martin Rosen 672 Jungle Queen Way Longboat Key, Florida 34228 Thomas W. Reese, Esquire 123 Eighth Street North St. Petersburg, Florida 33701 Patricia Petruff, Esquire John V. Quinlan, Esquire Dye & Scott, P.A. P.O. Box 9480 Bradenton, Florida 33506 Cecile I. Ross, Esquire Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Dale H. Twachtmann Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson General Counsel DER 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Findings Of Fact The County applied on August 24, 1979, for a permit to construct a swimming beach on the southwest shore of Sylvan Lake in the northwest part of Seminole County, Florida. On December 4, 1979, the Department gave notice of its intent to grant the permit. As proposed, the beach would be 150 feet in length along the shoreline and be approximately 65 feet deep, 40 feet on the land side of the waterline and 25 feet on the lake side of the shore waterline. Three dock structures are also proposed. The first is a boat dock to be 6 feet wide, which will extend into the lake for 25 feet with a 15 foot "L" at its end. In addition, a 6 foot wide, 20 foot long fishing pier is proposed with a 6 by 20 foot "T" on its end. Finally, the County proposes constructing a 6 foot wide 15 foot long aquatic study platform that would terminate in a 6 by 30 foot "T". The County plans to remove vegetation from an area of 150 feet long by 25 feet. As agreed at the hearing, this removal would be by hand only.. No machinery would be used. The site of the project is owned by the County. As part of its application, the County agrees to leave undisturbed 2,630 feet of the remaining shoreline it owns. At the present time approximately 20 percent of the lake's total shoreline is occupied by developed residential property. Many of the homeowners have removed the vegetation from their shorelines. The County's agreement not to alter 90 percent of its shoreline would therefore be beneficial to preserving the natural state of the lake. Sylvan Lake is an oligotropic spring-fed lake of 160 acres. Its well vegetated shoreline alternates between large grassy marshes and well-defined uplands. The lake bottom in the project site is firm sand with little potential for causing a turbidity problem. The lake has excellent water quality. It is a valuable habitat for fish and aquatic dependent birds and mammals. The vegetation along the shoreline of the project site consist of sawgrass, pickerelweed, and some arrowhead on the land side with spatterdock and mats of floating maidencane on the water side. In a freshwater closed system such as this lake the rooted emergent plants are vital to maintaining the quality of the water. The plants stabilize nutrients, expert oxygen and keep the water cool. The removal of this vegetation from a 150 foot strip will have an adverse but insignificant impact on the biological resources and the water quality of the lake. The construction of the fishing pier, boat dock, and observation platform will have no lasting environmental impact and the limited turbidity which may be generated during their construction can be well contained by the use of turbidity curtains. The swimming beach is a part of the County's plan for a diverse recreational park to provide the public with facilities for nature trails, baseball, picnicking, etc. The water classification of Sylvan Lake is Class III. CONCLUSIONS OF LAW The Division of Administrative Hearings has jurisdiction over the parties and the subject matter of this case. Section 120.57(1), Florida Statutes (1979). In this proceeding the Respondent, County, has the burden of proving that it has given reasonable assurances that the short term and long term effects of the proposed project will not result in violations of the water quality standards of Chapter 17-3, Florida Administrative Code. Section 17- 4.28(3), Florida Administrative Code; Dowdy v. Department of Environmental Regulation, Case No. 79-219, Recommended Order (DOAH July 19, 1979). That burden has been carried. The water quality standards of a Class III body such as Sylvan Lake are set out in Section 17-3.09, Florida Administrative Code. There is a preponderance of competent and substantial evidence that those standards in either the long term or in the short term will not be violated by the proposed project. The requisite reasonable assurances have therefore been given by the applicant. Hand removal of aquatic vegetation from a 150 foot strip of shoreline on a 186 acre lake, will have at most, a de minimus impact on the marine life, water quality or neighboring biota of Sylvan Lake. The applicant has met the criteria for the issuance of a permit, pursuant to Section 17-4.07, Florida Administrative Code.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That a final order be entered by the State of Florida, Department of Environmental Regulation determining that the requested dredge and fill permit be issued subject to the usual conditions and subject to the applicant's stipulation that any vegetation removal will be performed by hand and subject to any conditions contained in the Notice of Intent To Issue Permit. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 30th day of April, 1980. MICHAEL PEARCE DODSON Hearing Officer Division of Administrative Hearings Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: Mr. & Mrs. Gilbert Lee Swartz Route 1, Box 228 DD South Sylvan Lake Drive Sanford, FL 32771 Nikki Clayton Seminole County Courthouse Room 302, 301 N. Park Avenue Sanford, FL 32771 Segundo J. Fernandez, Esq. and Stanley J. Niego, Esq. Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32301 Mr. Raymond Lipton Route 1, Box 60-A Longwood, FL 32750
The Issue The issues to be resolved in this proceeding concern whether the applicant for the dredge and fill permit at issue has provided reasonable assurances that the project involved will comport with state water quality standards and public interest standards for purposes of Section 403.918(1)&(2), Florida Statutes. Specifically, it must be demonstrated that the applicant has provided reasonable assurances that the project is clearly in the public interest for purposes of Section 403.918(2), Florida Statutes, and related rules; whether Citrus County has standing to challenge the project; and whether the Department is required or authorized to enforce the provisions of the Citrus County Comprehensive Plan.
Findings Of Fact Kline filed an application for grant of a permit to construct a private boat dock with a roof, designed to cover a boat, in the Withlacoochee River. The Department has permitting jurisdiction, pursuant to Chapter 403, Florida Statutes, and related rules, inasmuch as the Withlacoochee River is a natural water body designed as Class III waters of the state, as well as an Outstanding Florida Water. The landward extent of the Department's jurisdiction is the wetland line depicted in Kline's exhibits 1 and 2 in evidence and in the testimony of Rose Poynor. The proposed installation consists of a private boat dock with boathouse or cover measuring 22 feet by 43 feet mounted on 12-inch diameter pilings. The boat cover roof would be approximately 14 feet above the surface of the Withlacoochee River at mean high tide. Portions of a presently- existing dock will be removed, leaving behind a walkway and terminal platform 6 feet wide and extending 6.5 feet from the wetland jurisdictional line out to the boat cover facility. The dock presently extends 6.5 feet from the wetlands jurisdictional line riverward. The existing dock shades the shoreline, including a non- jurisdictional area on the top of the bank. Kline proposes to remove a portion of this existing dock consisting of an area 10.75 feet by 12 feet on one side of the line and approximately 10.75 feet by 5 feet on the other side. This will include removing portions of the existing dock landward of the jurisdictional wetland line. The shoreline area that will be exposed upon removal of portions of the existing dock will be replanted with native plant species. The entire length of Kline's shoreline along the top of the existing bank will be cleared of nuisance species and planted with the required number of native plant species delineated in specific condition #18 of the intent to issue. More plants will be planted as necessary in order to maintain a 90 percent survival density of the required plants over a five-year period as specified in specific condition #21. Kline will also grant a perpetual conservation easement to the Department for the entire length of the shoreline extending a minimum of 4 feet waterward from the top of the bank. The conservation easement will insure protection of the planted shoreline and prevent any opportunity of shoreline hardening through construction of a seawall or other structures. The project will be constructed using best management practices for erosion control, including having the pilings driven from a barge over a period of three to five days so as to minimize the generation of turbidity. A floating turbidity curtain will also be used so as to surround the entire project area to prevent migration of turbidity off the site and which will not interfere with navigation. The total construction time is estimated to be three weeks. During construction, specific actions will be taken to avoid any impacts to manatees traveling the Withlacoochee River near the property. A turbidity curtain will not block manatee entry or exit from essential habitat and will be made of material in which manatees cannot become entangled or injured. Boats in the project area will operate at "no wake/idle speeds" at all times. Upon the sighting of a manatee, all construction activities will cease until the manatee has left the project area. Logs and details of manatee sightings will be maintained and reported to the Department's Marine Mammal Section. During construction, temporary signs will be installed and maintained; and after completion of the project, permanent signs and a permanent informational display will be located in areas specified by the Department's Marine Mammal Section. The specific actions to be taken to avoid impacts to Manatees during construction were developed by the Department's Marine Mammal Section and are imposed on the proposed project in specific condition #13 of the intent to issue as a condition upon a grant of the permit, and Kline has agreed to these conditions. Kline's property is located on the Withlacoochee River in Inglis, Levy County, Florida. The proposed project extends waterward of Kline's shoreline and the waterward portion of the project is located within the boundaries of Citrus County. Kline's property is approximately 7 to 8 miles from Yankeetown, which is downstream on the Withlacoochee River from Inglis. Yankeetown is located on the lower reaches of the Withlacoochee River near the point where it enters the Gulf of Mexico. The U.S. 19 Highway bridge is 900 to 1,000 feet upstream of the Kline property. Kline's shoreline is relatively steep with areas of exposed limestone. Vegetation along that shore consists of red maple, laurel oak, and other identifiable wetland species. Water depth drops off relatively quickly varying from 6 to 10 feet at the edge of the existing dock. The river is approximately 121.5 feet wide at the project site. The project's construction will extend approximately 21.7 percent of the width of the river at the project site after completion. On the opposite shore from the Kline property and project site, there is also a boat dock with a small boat basin which was dredged landward into the river bank at some time in the past. On the opposite shoreline, a fallen log projects into the river which does impede navigation to some extent on that side of the river but it is an easily removable obstruction. The log presently remains just below the water surface at high tide. The Cross Florida Barge Canal and spillway are located approximately 2 miles upstream from the Kline property and eastward from the U.S. 19 bridge. An island exists in the river around a bend downstream from the Kline property. The island prevents the passage of boats larger than 16-foot beam around the island and upriver toward the Kline property. The Withlacoochee River is a slow-moving, tannic-acid tinged river and historically was extensively shaded by a tree canopy. In the last half century or so, many of the trees have been removed to accommodate shoreline development which is characterized primarily by vacation homes, weekend retreats, and retirement homes with attendant docks, boathouses, seawalls, and similar private river and boat access facilities serving residential owners. The docks and boathouses existing in the river occur on both sides of the river from the Gulf of Mexico up at least as far as the U.S. 19 bridge. The historical character of the river has thus changed in the last several decades such that extensive numbers of docks, seawalls, boathouses and residences presently characterize the river margin. Water Quality Impacts The water quality impacts of this project will be minimal. The dock and boathouse installation will be placed upon pilings inserted into the river bottom. Installation of the pilings during construction will cause some temporary turbidity. The temporary turbidity that may be occasioned as a result of installation of the pilings will last only a few days at most, and a turbidity curtain will be used to control the turbidity, to prevent it from disbursing over a large area of the river. Turbidity curtains are a well- recognized, proven method for minimizing short-term water pollution violations due to turbidity occasioned by the setting of pilings for such projects. Requiring the applicant to re-vegetate the shoreline and maintain the natural vegetation will enhance natural shoreline pollution up-take processes, as well as erosion prevention. Water quality will be maintained, therefore, and possibly improve somewhat at the site after the re-vegetation of the shoreline and littoral margin. No other water quality parameters were shown to be potentially violated by the installation proposed. So long as no boat maintenance operations which involve the potential spillage of oils and greases, solvents, or bottom paint into the water are practiced, no violations were shown to potentially occur. The permit, if granted, should be restricted against such activities. Public Interest Standards and Considerations The issues and inquiry concerning the public interest standards as to this project related to the question of impacts on recreational uses of the river and navigational uses, as well as the issue of any impacts on manatees. The Department's biology expert, as well as manatee experts presented by the Intervenor, established that the Withlacoochee River is frequented by manatees, but is not a warm-water habitat for manatees. Manatees use the Withlacoochee River during the spring and summer months, but rarely during the winter because it is not a warm-water habitat. The river has been designated as an essential habit for manatees, however. This means that the area is used by them as a food source and as a breeding and rearing area. Although manatees have been seen throughout the length of the river and the immediate vicinity of the project site, the animals mostly use the estuarine mouth or lower reaches of the river. The project on the Kline property is approximately 8 miles upstream from the mouth of the river. There is no question that boats pose definite hazards to manatees through striking manatees with boats and propellers. Boats have been the cause of manatee deaths in Citrus County in the past. Manatees are an endangered species. The Withlacoochee River currently has speed zone regulations involving the requirement of boat operation with no wake, and Citrus County imposes certain dock design criteria on residents seeking to construct new boat docks. The Intervenor's manatee experts participated in the development of these dock design criteria and agree that general adherence to these criteria minimizes potential impacts on manatees. The expert witnesses produced by the Intervenor were mainly concerned with projects of this type causing possible impacts on manatee travel patterns if the dock projects too far from the shore, as well as potential loss of food sources from shading of the water bottom and the question of attendant boats adhering to speed zone regulations. The evidence establishes that the proposed dock will not exceed in a significant way the dock design criteria which the manatee experts agree would minimize any potential impacts on the animals. The experts testifying for the Intervenor had never visited the proposed project site and are unable to do more than make general observations and conclusions regarding any potential adverse impacts to manatees that the proposed project might have. One of the Intervenor's witnesses agreed, however, that the removal of portions of the existing dock structure would help revitalize aquatic vegetation to increase sunlight penetration which would benefit shoreline vegetation and the manatee habitat. The proposed project was shown not to affect manatee travel patterns and it will not have adverse shading impacts on aquatic vegetation due to the design of the facility, which will allow maximum sunlight penetration of the water column. Appropriate speed zones will be maintained during and after construction with the aid of signage warning Kline and the boating public of the need to adhere to "manatee friendly" boat operation practices. The testimony of both Kline and the Petitioner's witnesses establishes that both residents along the river and visitors frequently boat on the Withlacoochee River and there is a significant amount of boat traffic. Certain geographical restrictions such as river width, already existing dock and boathouse structures, the U.S. 19 Highway bridge, and the island between the Kline's property and the mouth of the river at Yankeetown act to limit the size of boats that can traverse this section of the river, as well as their speed. The witnesses agreed that two 16-foot beam boats could safely pass each other in front of the Kline dock even after completion of the project. The proposed project will be visibly marked with reflectors around its entire parameter with a minimum of one reflector on each piling as required by specific condition #15 in the intent to issue the proposed permit. Testimony from licensed boat captains presented by both the Petitioner and Kline establishes that reflectors are a normal requirement and are adequate for structures of this type and size. Kline presented evidence from a longtime native of Inglis, Bill Hart, that a structure with similar dimensions to the proposed project is located in the river at a point where the river is only 95 feet wide, significantly narrower than the width at the project site and yet does not obstruct navigation. That structure also is marked with reflectors and was shown not to pose a hazard to navigation. Witnesses adduced by Petitioner expressed concern that during high tide, the Kline's boat would be moored outside the boat cover and further decrease the river width available for navigation. The evidence showed, however, that Kline's boat would only be moored at the designated mooring location as required by specific condition #14 of the intent to issue. If necessary, Kline will be required to move the boat and anchor it down the river in an area of sufficient width if it should prove that his boat cannot be accommodated under the boat cover during some high tide conditions. Petitioner's witnesses also expressed concern that boats could not turn around in front of the Kline property when the installation is completed. The evidence showed, however, that boats can travel downstream and turn at the island or travel upstream to the U.S. 19 bridge. The U.S. 19 bridge pilings are approximately 20 feet apart which allows easy boat passage between them. The presence of Kline's boat will not represent any increase in boating traffic on the river. The previous owners of the same property used an existing dock to moor their boat. The evidence establishes that the proposed project will not cause a serious impediment to navigation more than is already the case and will not constitute a navigational hazard. The Petitioner's witnesses also expressed fears concerning reduction in the aesthetic quality of the view of the river and its banks. The river still enjoys some portion of tree canopy but is now largely characterized by man-made structures along both banks. Most residents in the vicinity of the Kline property already have docks, seawalls and/or boathouses. The installation of the proposed dock and boathouse or cover will not in any significant degree further impair the aesthetic quality of the view of the river and its banks from its present character. Cumulative Impacts Testimony from the Intervenor's expert witnesses showed concern regarding cumulative impacts of the proposed project on manatees and the "precedent" of granting Kline a permit. The Intervenor's witness feared that many people would apply for more boat docks on the Withlacoochee River and that Kline's project would set a bad precedent, if granted, as to cumulative impact. No evidence was presented to substantiate these concerns, however, and there was no showing that more such permit applications are pending before the relevant regulatory agency. The Department's expert witness established that no cumulative impacts could be expected from this project with regard to water quality, as well as the various public interest standards embodied in Section 403.918(2),(1-7), Florida Statutes. The Department itself has not received any other applications for similar projects in the vicinity.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is RECOMMENDED that a Final Order be entered by the Department of Environmental Protection directing that the Respondent/applicant, William Kline's application for the above-referenced dock terminal platform and boat cover be granted under the conditions found hereinabove and contained in the intent to issue. DONE AND ENTERED this 29th day of November, 1993, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of November, 1993. APPENDIX TO RECOMMENDED ORDER, CASE NO. 93-264 Petitioner's Proposed Findings of Fact The Petitioner does not state separate proposed findings of fact. Any proposed factual findings are inextricably entangled with extensive argument on the quantity and quality of testimony and other evidence and attempts to argue the Petitioner's position from the standpoint of documents referenced in the proposed findings of fact without an indication whether those documents are admitted into evidence or not. The Recommended Order can only be based upon testimony and evidence actually admitted and subject to cross-examination at hearing. The relevant and material issues raised in this case are delineated in the Recommended Order and have been fairly addressed and ruled upon and to the extent that the Petitioner's proposed findings of fact are in agreement with the findings of fact enunciated by the Hearing Officer, they are accepted. To the extent that they are not they are subordinate thereto and not supported by preponderant evidence and are rejected. Citrus County (Intervenor) Proposed Findings of Fact 1. Accepted to the extent not inconsistent with the findings of fact made by the Hearing Officer concerning standing. 2. Accepted to the extent not inconsistent with the findings of fact made by the Hearing Officer concerning standing. 3-7. Accepted. 8. Rejected, as irrelevant and immaterial. This is a de novo proceeding and the evidence adduced by a party, including the Department of Environmental Regulation, now known as the Department of Environmental Protection, at hearing and subject to cross-examination, is the only evidence or information upon which findings of fact and conclusions of law may be made. 9-10. Rejected, as irrelevant and immaterial. This is a de novo proceeding and the evidence adduced by a party, including the Department of Environmental Regulation, now known as the Department of Environmental Protection, at hearing and subject to cross-examination, is the only evidence or information upon which findings of fact and conclusions of law may be made. 11. Rejected, as not in accord with the preponderant weight of the evidence and for the reason that these are de novo proceedings and the quantity, quality, and credibility of testimony and evidence adduced at hearing is the basis for findings of fact and conclusions of law adjudicating this proceeding. 12. Rejected, as not in accord with the preponderant weight of the evidence and for the reason that these are de novo proceedings and the quantity, quality, and credibility of testimony and evidence adduced at hearing is the basis for findings of fact and conclusions of law adjudicating this proceeding. 13-14. Rejected, as immaterial and irrelevant in this de novo proceeding involving Chapter 403, Florida Statutes, and rules promulgated thereunder. Accepted, but not itself materially dispositive of the issues to be adjudicated in this proceeding. Accepted, but not materially dispositive of the issues material and relevant to adjudication of this proceeding. Rejected, in accordance with the ruling on motion in limine in this proceeding as immaterial, as not supported by the preponderant weight of the evidence and subordinate to the Hearing Officer's findings of fact. The competent, substantial evidence of record adduced at the hearing shows that the water quality considerations and public interest considerations embodied in Section 403.918(1)&(2), Florida Statutes, Section 403.919, Florida Statutes, and rules promulgated thereunder will be complied with by the project, as it is described in the evidence adduced at hearing. Rejected, as contrary to the preponderant weight of the credible evidence. Respondent Kline's Proposed Findings of Fact Any proposed findings of fact contained in the "Recommended Order" submitted by Respondent Kline cannot be separately and independently ruled upon. The document denominated "Recommended Order" submitted by Respondent Kline contains discussion and argument concerning the quantity and quality of the testimony in evidence, legal argument and, at best, is a discussion of the testimony of various witnesses, rather than coherent proposed findings. Therefore, the proposed findings of fact submitted by Respondent Kline to the extent they are proposed findings of fact are rejected as being incapable of coherent, cogent, separate rulings. Respondent Department of Environmental Regulation's Proposed Findings of Fact The proposed findings of fact submitted by the Department of Environmental Regulation, now known as the Department of Environmental Protection, to the extent they are consistent with the proposed findings of fact of the Hearing Officer are accepted. To the extent that those proposed findings of fact are inconsistent with those made by the Hearing Officer on the same issues and subject matter, they are rejected as being subordinate thereto or immaterial or not in accord with the preponderant weight of the evidence. COPIES FURNISHED: Mrs. Sarah Berger Post Office Box 83 Inglis, Florida 34449 William A. Kline, Jr. 398 South Inglis Avenue Inglis, Florida 34449 Francine M. Ffolkes, Esquire Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Richard W. Wesch, Esquire Assistant County Attorney 107 North Park Avenue, Suite 8 Inverness, Florida 34450 Virginia B. Wetherell, Secretary Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante, Esquire General Counsel Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Findings Of Fact Petitioner is the record owner of Lot 11, Block 4 and Lot 12, Block 2 of Ramrod Shores Marina Section subdivision on Ramrod Key in Monroe County, Florida. These lots lie across Angelfish Road from each other. They both lie across Mariposa Road from Torch Ramrod Channel which leads into Niles Channel which leads into the Gulf of Mexico to the north; to the south Torch Ramrod Channel leads into Newfound Harbor which opens onto the Atlantic Ocean. Mariposa Road appears on a subdivision plat filed in the official records of Monroe County in 1960, and on revisions of the original plat, one of which was filed in 1963, and the more recent of which was filed in 1969. On the two earlier plats, it is recited that "[r]oads shown hereon not previously dedicated or owned by the State or County are hereby dedicated to the perpetual use of the public." The evidence did not show whether Monroe County or any other governmental body had accepted the dedication of Mariposa Road. Cape Sable Corporation, a predecessor in title to petitioner, trucked in oolite fill to construct Mariposa Road; and repaired the road after occasional washouts, a practice which petitioner's immediate predecessor in title, James Brown, continued. Because the rock which was used to build Mariposa Road is loosely packed, water from the channel percolates through the road even when it is not high enough to move across the road in a sheet, which sometimes happens. There are also low lying places in the road through which tidal waters flow onto petitioner's property. Salt water up to a foot deep regularly stands on petitioner's property, which is overgrown with spider mangroves and red mangroves. The mangroves stabilize the shoreline on account of their root systems, which also serve to filter out certain substances which would otherwise run off into the channel. Decaying plant matter produced by the mangroves supports various microorganisms which constitute an early link in the food chain that results in commercial fisheries. Killifish, needlefish, jelly fish and wading birds all frequent petitioner's property in its present state. Covering petitioner's lots with fill would destroy or displace the marine life now flourishing there. Respondent has requested James Brown to remove the fill along Mariposa Road, citing Chapter 403, Florida Statutes, and the Army Corps of Engineers has taken similar action under applicable federal laws. Mr. Brown evinced an intent at the hearing not to comply with these requests, but to work instead to persuade Monroe County to blacktop Mariposa Road. Paving Mariposa Road with blacktop would involve compacting rock or otherwise creating an underbed impermeable to water. Mr. Brown envisions Mariposa Road being upgraded to the level of State Road 4, which it intersects, before being paved. If Mariposa Road were upgraded and paved in this fashion, it would act as a dam keeping tidal waters out of petitioner's lots, unless culverts were installed. In the event Mariposa Road is upgraded and paved and no culverts are installed, the marine habitat which now exists on petitioner's property would be doomed and filling the lots would hasten the process at worst.
Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That respondent deny petitioner's application for fill permit unless and until Mariposa Road is upgraded, without installation of culverts, and paved, so that it acts as a dam impervious to the waters of Torch Ramrod Channel. DONE and ENTERED this 17th day of February, 1978, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 904/488-9675 COPIES FURNISHED: Mr. Edward B. Johnson, Jr., Esquire 410 Fleming Street Key West, Florida 33040 Mr. Louis F. Hubener, Esquire Montgomery Building 2562 Executive Center Circle East Tallahassee, Florida 32301 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION FRANCIS X. ATWATER, Petitioner, vs. CASE NO. 77-1409 DEPARTMENT OF ENVIRONMENTAL REGULATION, Respondent. /
The Issue The issues in this case are whether IP is entitled to issuance of National Pollutant Discharge Elimination System (NPDES) Permit Number FL0002526-001/001-IW1S ("the proposed permit"), Consent Order No. 04-1202, Authorization for Experimental Use of Wetlands Order No. 04-1442, and Waiver Order No. 04-0730 (collectively, "the Department authorizations"), which would authorize IP to discharge treated industrial wastewater from its paper mill in Cantonment, Escambia County, Florida, into wetlands which flow to Elevenmile Creek and Perdido Bay.
Findings Of Fact Introduction A. The Parties The Department is the state agency authorized under Chapter 403, Florida Statutes (2006),2 to regulate discharges of industrial wastewater to waters of the state. Under a delegation from the United States Environmental Protection Agency (EPA), the Department administers the NPDES permitting program in Florida. IP owns and operates the integrated bleached kraft paper mill in Cantonment, Escambia County, Florida. FOPB is a non-profit Alabama corporation3 established in 1988 whose members are interested in protecting the water quality and natural resources of Perdido Bay. FOPB has approximately 450 members. About 90 percent of the members own property adjacent to Perdido Bay. James Lane is the President of FOPB. Mellita A. Lane, Zachary P. Lane, Peter A. Lane, and Sarah M. Lane are the adult children of Dr. Jacqueline Lane and James Lane. Dr. Lane and James Lane live on property adjacent to Perdido Bay with their son Peter. The Adjacent Waters The mill's wastewater effluent is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. The creek flows southwest into the northeastern portion of Perdido Bay. Elevenmile Creek is a freshwater stream for most of its length but is sometimes tidally affected one to two miles from its mouth. Elevenmile Creek is designated as a Class III water. Perdido Bay is approximately 28 square miles in area and is bordered by Escambia County on the east and Baldwin County, Alabama on the west. The dividing line between the states runs north and south in the approximate middle of Perdido Bay. U.S. Highway 90 crosses the Bay, going east and west, and forms the boundary between what is often referred to as the "Upper Bay" and "Lower Bay." The Bay is relatively shallow, especially in the Upper Bay, ranging in depth between five and ten feet. Perdido Bay is designated as a Class III water. Sometime around 1900, a manmade navigation channel was cut through the narrow strip of land separating Perdido Bay from the Gulf of Mexico. The channel, called Perdido Pass, allowed the salt waters of the Gulf to move with the tides up into Perdido Bay. Depending on tides and freshwater inflows, the tidal waters can move into the most northern portions of Perdido Bay and even further, into its tributaries and wetlands. The Perdido River flows into the northwest portion of Perdido Bay. It is primarily a freshwater river but it is sometimes tidally influenced at and near its mouth. The Perdido River was designated an Outstanding Florida Water (OFW) in 1979. At the north end of Perdido Bay, between Elevenmile Creek and the Perdido River, is a large tract of land owned by IP called the Rainwater Tract. The northern part of the tract is primarily freshwater wetlands. The southern part is a tidal marsh. Tee and Wicker Lakes are small (approximately 50 acres in total surface area) tidal ponds within the tidal marsh. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to Tee and Wicker Lakes from Perdido Bay. The Mill 1. Production Florida Pulp and Paper Company first began operating the Cantonment paper mill in 1941. St. Regis Paper Company (St. Regis) acquired the mill in 1946. In 1984, Champion International Corporation (Champion) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such as printing and writing grades of paper. In 2001, Champion merged with IP, and IP took over operation of the mill. The primary product of the mill continues to be printing and writing paper. The mill is integrated, meaning that it brings in logs and wood chips, makes pulp, and produces paper. The wood is chemically treated in cookers called digesters to separate the cellulose from the lignin in the wood because only the cellulose is used to make paper. Then the "brown stock" from the digesters goes through the oxygen delignification process, is mixed with water, and is pumped to paper machines that make the paper products. There are two paper machines located at the mill. The larger paper machine, designated P5, produces approximately 1,000 tons per day of writing and printing paper. The smaller machine, P4, produces approximately 400 to 500 tons per day of "fluff pulp." 2. The Existing Wastewater Treatment Plant The existing wastewater treatment plant (WWTP) at the mill is described in the revised NPDES permit as a "multi-pond primary and secondary treatment system, consisting of a primary treatment system (primary settling basin, polymer addition, two solids/sludge dewatering basins, and a floating dredge), and secondary treatment system (four ponds in series; two aerated stabilization basins with approximately 2,200 horsepower (HP) of aeration capacity, a nutrient feed system, two non-aerated polishing ponds and a final riffle section to re-aerate the effluent)." The WWTP is a system for reducing the biological oxygen demand (BOD) of the mill's wastewater by bacteria. IP’s wastewater is nutrient deficient when it enters the WWTP. Nutrients in the form of phosphorus and nitrogen must be added for the growth of bacteria. The WWTP begins with a primary settling basin in which suspended solids settle to the bottom. The solids form a sludge that is pumped by hydraulic dredge into two dewatering basins. The dewatering basins are used alternately so that, as one pond is filled, water is removed from the other pond. After being dewatered, the sludge is removed and allowed to dry. Then, it is transported to a landfill located about five miles west of the mill on land owned by IP. The water removed from the dewatering basins moves into to the first aeration basin. The aeration basin has floating aerator devices that add oxygen to facilitate biological conversion of the wastewater. The wastewater then flows sequentially through three more basins where there is further oxygenation and settling of the biological solids. The discharge from the fourth settling basin flows through a riffle section where the effluent is aerated using a series of waterfalls. This is the last element of the treatment process from which the mill's effluent enters waters of the state. Chemicals are added during the treatment process to control phosphorus and color. Chemicals are also added to suppress foam. Sanitary wastewater from the mill, after pretreatment in an activated sludge treatment system, is "sewered" to the mill's WWTP and further treated in the same manner as the industrial wastewater. A separate detention pond collects and treats stormwater from onsite and offsite areas and discharges at the same point as the wastewater effluent from the WWTP. Stormwater that falls on the industrial area of the mill is processed through the WWTP. The discharge point from the WWTP, and the point at which the effluent is monitored for compliance with state effluent limitations, is designated D-001, but is also called the Parshall Flume. The effluent is discharged from the Parshall Flume through a pipe to an area of natural wetlands. After passing through the wetlands, the combined flow runs through a pipe that enters Elevenmile Creek from below the surface. This area is called the "boil" because the water can be observed to boil to the surface of Elevenmile Creek. From the boil, the mill effluent flows approximately 14 miles down (apparently misnamed) Elevenmile Creek to upper Perdido Bay. Regulatory History of the Mill Before 1995, the mill had to have both state and federal permits. The former Florida Department of Environmental Regulation (DER) issued St. Regis an industrial wastewater operating permit in 1982 pursuant to Chapter 403, Florida Statutes. The EPA issued St. Regis an NPDES permit in 1983 pursuant to the Clean Water Act. When it acquired the facility in 1984, Champion continued to operate the mill under these two permits. In 1986, Champion obtained a construction permit from DER to install the oxygen delignification technology and other improvements to its WWTP in conjunction with the conversion of the production process from an unbleached to a modified bleached kraft production process. In 1987, Champion applied to DER for an operating permit for its modified WWTP and also petitioned for a variance from the Class III water quality standards in Elevenmile Creek for iron, specific conductance, zinc, and transparency. DER's subsequent proposal to issue the operating permit and variance was formally challenged.4 In 1988, while the challenges to the DER permit and variance were still pending, Champion dropped its application for a regular operating permit and requested a temporary operating permit (TOP), instead. In December 1989, DER and Champion entered into Consent Order No. 87-1398 ("the 1989 Consent Order"). The 1989 Consent Order included an allegation by DER that the mill's wastewater discharge was causing violation of state water quality standards in Elevenmile Creek for dissolved oxygen (DO), un-ionized ammonia, and biological integrity. The 1989 Consent Order authorized the continued operation of the mill, but established a process for addressing the water quality problems in Elevenmile Creek and Perdido Bay and bringing the mill into compliance in the future. Champion was required to install equipment to increase the DO in its effluent within a year. Champion was also required to submit a plan of study and, 30 months after DER's approval of the plan of study, to submit a study report on the impacts of the mill's effluent on DO in Elevenmile Creek and Perdido Bay and recommended measures for reducing or eliminating adverse impacts. The study report was also supposed to address the other water quality violations caused by Champion. A comprehensive study of the Perdido Bay system was undertaken by a team of 24 scientists lead by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed by a series of related scientific studies, which will be referred to collectively in this Recommended Order as "the Livingston studies." The 1989 Consent Order had no expiration date, but it was tied to the TOP, which had an expiration date of December 1, 1994. Champion was to be in compliance with all applicable water quality standards by that date. The TOP established the following specific effluent discharge limitations for the mill: Monthly Average Maximum Biological Oxygen Demand (BOD) (Mar-Oct) 4,500 lbs/day 6,885 lbs/day (Nov-Feb) 5,100 lbs/day 6,885 lbs/day Total Suspended Solids (TSS) (Mar-Oct) 8,000 lbs/day 27,000 lbs/day (Nov-Feb) 11,600 lbs/day 27,000 lbs/day Iron 3.5 mg/l Specific Conductance 2,500 micromhos/cm Zinc .075 mg/l The limits stated above for iron, specific conductance, and zinc were derived from the variance granted to Champion. Champion was also granted variances from the water quality standards for biological integrity, un-ionized ammonia, and DO. The 1989 Consent Order, TOP, and variance were the subject of the Recommended Order and Final Order issued in Perdido Bay Environmental Association, Inc. v. Champion International Corporation, 89 ER FALR 153 (DER Nov. 14, 1989). Champion's deviation from the standards for iron, zinc, and specific conductance pursuant to the variance was determined to present no significant risk of adverse effect on the water quality and biota of Elevenmile Creek and Perdido Bay. The mill effluent's effect on transparency (reduced by color in the mill effluent) was considered a potentially significant problem. However, because it was found that there was no practicable means known or available to reduce the color, and there was insufficient information at that time to determine how Champion's discharge of color was affecting the biota, Champion was allowed to continue its discharge of color into Elevenmile Creek pending the results of the Livingston studies. In the administrative hearing, the petitioners argued that it was unreasonable to put off compliance for five years, but the hearing officer determined that five years was reasonable under the circumstances. One finding in the Recommended Order and a reason for recommending approval of the TOP and Consent Order was: After the studies referred to in the consent order, the Department will not allow Champion additional time to study problems further. Significant improvements will be required within the five year period and at the end of that period, the plant will be in compliance with all water quality standards or will be denied an operating permit, with related enforcement action. The requirement of the 1989 Consent Order that Champion be in compliance with all applicable standards by December 1994, was qualified with the words "unless otherwise agreed." In considering this wording, the hearing officer opined that any change in the compliance deadline "would require a new notice of proposed agency action and point of entry for parties who might wish to contest any modification in the operational requirements, or changes in terms of compliance with water quality standards." The mill was not in compliance with all water quality standards in December 1994. No enforcement action was taken by the Department and no modification of the 1989 Consent Order or TOP was formally proposed that would have provided a point of entry to any members of the public who might have objected. Instead, the Department agreed through correspondence with Champion to allow Champion to pursue additional water quality studies and to investigate alternatives to its discharge to Elevenmile Creek. In 1994 and 1995, Champion applied to renew its state and federal wastewater permits, which were about to expire. The Department and EPA notified Champion that its existing permits were administratively extended during the review of the new permit applications. Today, the Cantonment mill is still operating under the 1989 TOP which, due to the administrative extension, did not terminate in December 1994, as stated on its face. In November 1995, following EPA's delegation of NPDES permitting authority to the Department, the Department issued an order combining the state and federal operating permits into a single permit identified as Wastewater Permit Number FL0002526-002-IWF/MT. In summary, the permit requirements currently applicable to the operation of the Cantonment paper mill are contained in the following documents: January 3, 1983, EPA NPDES Permit December 13, 1989, DER Temporary Operating Permit (TOP) December 13, 1989, DER Consent Order December 12, 1989, DER Variance November 15, 1995, DEP Order (combining the NPDES permit and the State-issued wastewater permit) April 22, 1996, DEP Letter (clarifying November 15, 1995, Order regarding 1983 NPDES Permit) During the period from 1992 to 2001, more water quality studies were conducted and Champion investigated alternatives to discharging into upper Elevenmile Creek, including land application of the effluent and relocation of the discharge to lower Elevenmile Creek or the Escambia River. In 2001, IP and Champion merged and IP applied to the Department to have the mill permit and related authorizations transferred to IP. Dr. Lane formally challenged the proposed transfer, but she was determined to lack standing. One conclusion of law in the Recommended Order issued in the 2001 administrative case was that the mill was in compliance with the consent order, TOP, and variance. That conclusion was not based on a finding that Champion was in compliance with all applicable water quality standards, but that the deadline for compliance (December 1, 1994) had been extended indefinitely by the pending permit renewal application. In 2001, Dr. Lane twice petitioned the Department for a declaratory statement regarding the Department's interpretation of certain provisions of the 1989 Consent Order. The first petition was denied by the Department because Dr. Lane failed to adequately state her interests and because she was a party in a pending case in which the Consent Order was at issue. Dr. Lane second petition was denied for similar reasons. Over 14 years after the deadline established in the 1989 TOP for the mill to be in compliance with all applicable standards in Elevenmile Creek, IP is still not meeting all applicable standards. However, the combination of (1) Consent Order terms that contemplated unspecified future permit requirements based on yet-to-be-conducted studies, (2) the wording in the TOP that tied the deadline for compliance to the expiration of the TOP, and (3) the administrative extension of the TOP, kept the issue of Champion's and IP's compliance in a regulatory limbo. It increased the Department's discretion to determine whether IP was in compliance with the laws enacted to protect the State's natural resources, and reduced the opportunity of interested persons to formally disagree with that determination. The Proposed Authorizations A. In General In September 2002, while Champion's 1994 permit renewal application was still pending at DEP, IP submitted a revised permit renewal application to upgrade the WWTP and relocate its discharge. The WWTP upgrades consist of converting to a modified activated sludge treatment process, increasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (mgd). IP proposes to convey the treated effluent by pipeline 10.7 miles to a 1,464-acre wetland tract owned by IP5, where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and upper Perdido Bay. IP revised its permit application again in October 2005, to obtain authorization to reconfigure the mill to produce unbleached brown paper for various grades of boxes. If the mill is reconfigured, only softwood (pine) would be used in the new process. On April 12, 2005, the Department issued a Notice of Intent to Issue the proposed NPDES permit, together with Consent Order No. 04-1202, Authorization for Experimental Use of Wetlands Order No. 04-4442, and Waiver Order No. 04-0730. An exemption from water quality criteria in conjunction with the experimental use of wetlands for wastewater treatment is provided for in Florida Administrative Code Rule 62-660.300(1). The proposed exemption order would exempt IP from Class III water quality criteria for pH, DO, transparency, turbidity, and specific conductance. The proposed waiver order is associated with the experimental use of wetlands exemption and relieves IP of the necessity to comply with two exemption criteria related to restricting public access to the area covered by the exemption. The Department and IP contend that restricting public access to Tee and Wicker Lakes is unnecessary. The proposed Consent Order is an enforcement document that is necessary if the mill is to be allowed to operate despite the fact that its wastewater discharge is causing violations of water quality standards. A principal purpose of the proposed Consent Order is to impose a time schedule for the completion of corrective actions and compliance with all state standards. The proposed Consent Order would supersede the 1989 Consent Order. The Proposed NPDES Permit 1. WWTP Upgrades IP's primary objective in upgrading the WWTP was to reduce the nitrogen and phosphorus in the mill's effluent discharge. The upgrades are designed to reduce un-ionized ammonia, total soluble nitrogen, and phosphorus. They are also expected to achieve a modest reduction of BOD and TSS. Upgraded pond 1 is expected to convert soluble BOD to suspended solids and to accomplish other biological conversions seven or eight times faster than the current pond 1. The modification of pond 3 to an activated sludge system is expected to more rapidly remove and recycle the solids back into pond 1. Pond 3 will have a much larger bacterial population to treat the effluent. There would also be additional pH control at the end of pond 3. IP would continue to use its Rock Crossing Landfill for disposal of wastewater sludge removed from the WWTP. Authorization for the landfill is part of the proposed NPDES permit. Groundwater monitoring beneath the landfill is required. The WWTP upgrades would include increased storm surge capacity by converting two existing aeration and settling basins (ponds 2 and 4) to storm surge basins. The surge basins would allow the mill to manage upsets and to withstand a 25-year, 24-hour storm event of 11 inches of rain. Rainfall that falls into the production areas would flow to the WWTP, and be impounded in ponds 2 and 4. After the storm event this impounded water would flow back through the WWTP where it would be treated before flowing through the compliance point and into the pipeline to the wetland tract. The Department required IP to monitor for over 129 pollutants in its stormwater runoff from the mill’s manufacturing facility, roads, parking lots, and offsite nonpoint sources. No pollutants were found in the stormwater at levels of concern. The average volume of mill discharge would be mgd. IP plans to obtain up to 5 mgd of treated municipal wastewater from a new treatment facility planned by the Emerald Coast Utility Authority (ECUA), which would be used in the paper production process and would reduce the need for groundwater withdrawals by IP for this purpose. The treated wastewater would enter the WWTP along with other process wastewater, be treated in the same manner in the WWTP, and become part of the effluent conveyed through the pipeline to the wetland tract. 2. Effluent Limitations The effluent limitations required by the proposed permit include technology-based effluent limits (TBELs) that apply to the entire pulp and paper industry. TBELs are predominantly production-based and are designed to limit the amount of pollutants that may be discharged per ton of product produced. The Cantonment mill has not had a problem in meeting TBELs. The TBELs that IP must meet are in the "Cluster Rule" promulgated by the EPA and adopted by the Department. The mill already meets the TBELS applicable to its current bleaching operation. In fact, EPA determined that the mill was performing in the top 5 percent of similar mills in the nation. The mill would have to meet the TBELs for a brown kraft operation if that conversion is made by IP. The proposed permit also imposes water quality- based effluent limits (WQBELs) that are specific to the Cantonment mill and the waters affected by its effluent discharge. The WQBELs for the mill are necessary for certain constituents of the mill's effluent because the TBELs, alone, would not be sufficient to prevent water quality criteria in the receiving waters from being violated. For example, the TBEL for BOD for similar pulp and paper mills is 15,943 pounds per day (ppd) on a monthly average, but the WQBEL for BOD for the Cantonment mill would be 4,500 ppd in summer and 5,100 ppd in winter. Dr. Livingston developed an extensive biological and chemical history of Perdido Bay and then evaluated the nutrient loadings from Elevenmile Creek over a 12-year period to correlate mill loadings with the biological health of the Bay. Because Dr. Livingston determined that the nutrient loadings from the mill that occurred in 1988 and 1989 did not adversely impact the food web of Perdido Bay, he recommended effluent limits for ammonia nitrogen, orthophosphate, and total phosphorous that were correlated with mill loadings of these nutrients in those years. The Department used Dr. Livingston’s data, and did its own analyses, to establish WQBELs for orthophosphate for drought conditions and for nitrate-nitrite. WQBELs were ultimately developed for total ammonia, orthophosphate, nitrate-nitrite, total phosphorus, BOD, color, and soluble inorganic nitrogen. The WQBELs in the proposed permit were developed to assure compliance with water quality standards under conditions of pollutant loadings at the daily limit (based on a monthly average) during low flow in the receiving waters. The proposed permit also establishes daily maximum limits (the most that can be discharged on any single day). For BOD, the daily maximum limit is 9,000 ppd. William Evans, the Department employee with primary responsibility for the technical review of the proposed Department authorizations, said that setting the daily maximum limit at twice the monthly average was a standard practice of the Department. The maximum daily limits are not derived from the Livingston studies. Dr. Glen Daigger, a civil and environmental engineer, designed a model for the WWTP and determined the modifications necessary to enable the WWTP's discharge to meet all TBELs and WQBELs. Petitioners did not dispute that the proposed WWTP is capable of achieving the TBELs and WQBELs. Their main complaint is that the WQBELs are not adequate to protect the receiving waters. 3. Discharge to the Wetland Tract IP proposes to relocate its discharge to the wetland tract as a means to end decades of failure by the mill to meet water quality standards in Elevenmile Creek. Discharging to the wetland tract, which flows to the marine waters of lower Elevenmile Creek and Perdido Bay, avoids many of the problems associated with trying to meet the more stringent water quality standards applicable in a freshwater stream. An effluent distribution system is proposed for the wetland tract to spread the effluent out over the full width of the wetlands so that their full assimilative capacity is utilized. This would be accomplished by a system of berms running perpendicular to the flow of water through the wetlands, and gates and other structures in and along the berms to gather and redistribute the flow as it moves in a southerly direction toward Perdido Bay and lower Elevenmile Creek. The design incorporates four existing tram roads that were constructed on the wetland tract to serve the past and present silviculture activities there. The tram roads, with modifications, would serve as the berms in the wetland distribution system. As the effluent is discharged from the pipeline, a point designated D-003, it would be re-aerated6 and distributed across Berm 1 through a series of adjustable, gated openings. Mixing with naturally occurring waters, the effluent would move by gravity to the next lower berm. The water will re-collect behind each of the vegetated berms and be distributed again through each berm. The distance between the berms varies from a quarter to a half mile. Approximately 70 percent of the effluent discharged at D-003 would flow by gravity a distance of approximately 2.3 miles to Perdido Bay. The remaining 30 percent of the effluent would flow a shorter distance to lower Elevenmile Creek. A computer simulation performed by Dr. Wade Nutter, an expert in hydrology, soils, and forested wetlands, indicated that the effluent discharged at D-003 will move through the wetland tract at a velocity of approximately a quarter-of-a-foot per second and the depth of flow across the wetland tract will be about one-half inch. It would take four or five days for the effluent to reach lower Elevenmile Creek and Perdido Bay. As the treated effluent flows through the wetland tract, there will be some removal of nutrients by plants and soil. Nitrogen and phosphorous are expected to be reduced approximately ten percent. BOD in the effluent is expected to be reduced approximately 90 percent. Construction activities associated with the effluent pipeline and berm modifications in the wetland tract were permitted by the Department in 2003 through issuance of a Wetland Resource Permit to IP. The United States Army Corps of Engineers has also permitted this work. No person filed a petition to challenge those permits. A wetland monitoring program is required by the proposed permit. The stated purpose of the monitoring program is to assure that there are no significant adverse impacts to the wetland tract, including Tee and Wicker Lakes, and is referred to as the No Significant Adverse Impact (NSAI) analysis. A year of "baseline data" on the wetlands and Tee and Wicker Lakes was collected and submitted to the Department for use in developing the NSAI analysis, but was not made a part of the record in this case. After the discharge to the wetland tract commences, the proposed permit requires IP to submit wetland monitoring reports annually to the Department. A monitoring program was also developed by Dr. Livingston and other IP consultants to monitor the impacts of the proposed discharge on Elevenmile Creek and Perdido Bay. It was made a part of the proposed permit. The Exemption for Experimental Use of Wetlands Florida Administrative Code Rule 62-660.300(1) provides an exemption from water quality criteria for the experimental use of wetlands. The proposed Authorization for Experimental Use of Wetlands Order would exempt IP from Class III water quality criteria for pH, DO, transparency, turbidity, and specific conductance. The proposed exemption order sets forth "interim limits" for pH, DO, color, turbidity, and specific conductance. The proposed exemption order also states that IP may petition for alternative water quality criteria pursuant to Florida Administrative Code Rule 62- 66D.300(1)(b)(c) and (d). The exemption is for 5 years beginning with the commencement of discharge into the wetland tract at D-003. The exemption it can be renewed by IP by application to the Department. The Waiver To qualify for the experimental use of wetlands exemption, Florida Administrative Code Rules 62- 660.300(1)(a)3 and 4 require, respectively, that the public be restricted from the exempted wetland area and that the waters not be used for recreation. IP proposes to prevent public access to the area of the wetland tract where the effluent distribution system is located. This is the freshwater area of the wetland tract and includes the four berms. However, IP does not want, nor believe it is necessary, to prevent public access and recreation on Tee and Wicker Lakes within the tidal marsh below berm 4. These lakes are accessible by boat from Perdido Bay and are used now by the public for boating and fishing. The Proposed Consent Order The proposed Consent Order establishes a schedule for the construction activities associated with the proposed WWTP upgrades and the effluent pipeline and for incremental relocation of the mill's discharge form Elevenmile Creek to the wetland tract. IP is given 24 months to complete construction activities and begin operation of the new facilities. At least 25 percent of the mill's effluent must be diverted to the wetland tract. At least 25 percent of the effluent is to be diverted to the wetland tract when the new facilities begin operations. The volume of effluent diverted to the wetlands is to increase another 25 percent every three months thereafter so that three years after issuance of the permit 100 percent of the effluent is being discharged into the wetland tract and there is no longer a discharge at D-001 into Elevenmile Creek.7 The proposed Consent Order establishes interim effluent limitations that would apply immediately upon the effective date of the Consent Order and continue during the 24-month construction period when the mill will continue to discharge into Elevenmile Creek. Other interim effluent limits would apply during the 12-month period following construction when the upgraded WWTP would be operating and the effluent would be incrementally diverted from Elevenmile Creek to the wetland tract. A third set of interim effluent limits would apply at D-003 when 100 percent of the discharge is into the wetland tract. They include the interim limits for specific conductance, pH, DO, color, and turbidity established through the experimental use of wetland exemption. The proposed Consent Order requires IP to submit a report within six months with the results of the 2004 transparency study. The Department must be satisfied that the study shows the transparency standard will not be violated before the wetlands can be used for the discharge. This report has already been submitted to the Department, but the Department has not yet completed its review of the report. Nevertheless, it was admitted into the record as IP Exhibit 79. The proposed Consent Order provides that, in the event IP's does not receive treated sanitary wastewater from the planned ECUA facility, IP will notify the Department and submit an alternate compliance plan to the Department for the Department's approval. The submittal and approval of an alternate compliance plan would extend the time for compliance with water quality standards by another six months. The Department amended the proposed Consent Order at the conclusion of the hearing to provide for notice to the public and an opportunity for persons to object to the Department's action on any alternate compliance plan. The Consent Order requires a "Plan of Action" to determine "whether there remains a critical period for ortho-phosphate loading to lower Elevenmile Creek and Perdido Bay." The proposed Consent Order requires IP to submit within 97 months (which would allow for five years of discharge to the wetland tract) a final report on whether there has been significant adverse impacts in the wetlands and Tee and Wicker Lakes resulting from the discharge of effluent pursuant to the interim limits for pH, DO, specific conductance, turbidity, and color. If the NSAI analysis shows no significant adverse impact has occurred, the proposed Consent Order contemplates that IP or the Department would establish alternative water quality criteria that would apply permanently in the wetland tract. IP is required by the Consent Order to submit quarterly progress reports of its progress toward compliance with the required corrective actions and deadlines. The Consent Order imposes a "stipulated penalty" of $500 per day for noncompliance with its terms. It also contains a statement that a violation of its terms may subject IP to civil penalties up to $10,000 per day. The Principal Factual Disputes A. The Evidence in General Much of the water quality and biological data presented by Petitioners were limited in terms of the numbers of samples taken, the extent of the area sampled, and the time period covered by the sampling. Much of the expert testimony presented by Petitioners was based on limited data, few field investigations, and the review of some, but not all relevant permit documents.8 On the other hand, the Livingston studies represent perhaps the most complete scientific evaluation ever made of a coastal ecosystem. Even Dr. Lane called the Livingston studies "huge" and "amazing." Therefore, with regard to the factual issues raised by Petitioners that involved scientific subjects investigated in the Livingston studies, Petitioners' data and the expert opinions based on those data were generally of much less weight than the data and conclusions of the Livingston studies. However, the Livingston studies did not address all of the factual issues in dispute. Some of the evidence presented by Petitioners regarding historical water quality conditions in Perdido Bay and Elevenmile Creek was lay testimony. The lay testimony was competent and sufficient to prove the existence of environmental conditions that are detectable to the human senses, such as an offensive smell, a dark color, or a sticky texture. Historical Changes in Perdido Bay Petitioners claim that, before the Cantonment mill began operations in the 1940s, Perdido Bay was a rich and diverse ecosystem and a beautiful place for swimming, fishing, boating, and other recreational activities. Petitioners blame the mill effluent for all the adverse changes they say have occurred in Perdido Bay. Petitioners claim that the water in Perdido Bay was much clearer before the mill was built. James Lane, who has lived on the Bay for 65 years, said he began to notice in the late 1940s that the water was becoming dark and filled with wood fibers. Mr. Lane recalls that there used to be an abundance of fish in the Perdido Bay, including croakers, pinfish, flounder, redfish, minnows, and catfish. Now Mr. Lane sees few of these fish in the Bay and he believes the remaining fish are unfit to eat because they look diseased to him. Mr. Lane said there were extensive areas of sea grasses in the Bay which supported large numbers of shrimp, crabs, and mussels, but these grasses are now gone. The Lane family used to enjoy swimming in Perdido Bay but stopped swimming years ago because the water felt sticky and often had a brown foam or scum on the surface. Mr. Lane and others members of FOPB claim to have gotten infections from swimming in the Bay. Mr. Lane and other witnesses described the odor of Elevenmile Creek near the mill as unpleasant and, at times, offensive. They consider the Creek to be too polluted for swimming. Donald Ray, who has been a Department biologist for 30 years, said he has received many complaints from citizens about the conditions in Perdido Bay. He said the foam that occurs in Perdido Bay is not natural foam, but one that persists and leaves a stain on boats. On the other hand, it is Dr. Livingston's opinion that the ecological problems of Perdido Bay are due primarily to the opening of Perdido Pass around 1900. The opening of the pass allowed Gulf waters to enter Perdido Bay and caused salinity stratification in the Bay, with marine waters on the bottom and fresh water from the Perdido River, Elevenmile Creek, and other tributaries on the top. The stratification occurs regularly in the lower Bay, but only during low flow conditions in most of the upper Bay, Perdido River, and Elevenmile Creek. It restricts DO exchange between the upper and lower water layers and results in low DO levels in the lower layer. Low DO, or "hypoxia," is the primary cause of reduced biological diversity and productivity in Perdido Bay. Dr. Livingston's initial study of the Perdido Bay system (1988-91) included an investigation of historical conditions, using documents and maps, anecdotal statements of area residents, as well as historic water quality and sediment data. Dr. Livingston found general agreement from most sources that: [P]rior to the 1940s, the various rivers and the bay in the Perdido Basin were quite different from what they are today. Eyewitness accounts from 1924 indicate a bay that was clear and "bluish" in color; the bottom could be seen at depths of five feet. According to resident' accounts, seagrasses grew from Garth Point to Witchwood; the grassbeds provided cover for many shrimp that were taken at the time. Flounder were taken with gigs and crabs were taken with hand nets. According to these accounts, the water from the various rivers and creeks in the area was relatively clear, and white sand/gravel bottoms were dominant forms of habitat in the freshwater and estuarine systems. The water was tea- colored but clear. Redfish, trout, blue crabs, shrimp, and mullet were abundant. * * * [T]hrough the early 1900s, the Elevenmile Creek was said to be crystal clear with soft white sand and good fishing. * * * According to various reports, in the early 1950s, the waters of Elevenmile Creek turned black, with concentrations of foam observed floating on the surface. By 1986, more than 28 million gallons of largely untreated effluent was flowing into the Elevenmile Creek- Perdido Bay system each day. Experiments by the Florida Game and Fresh Water Fish Commission had shown that the creek waters were lethal. The Florida Board of Health reported that Elevenmile Creek was "grossly polluted" and that Perdido Bay had been "greatly degraded within the 1.5 mile radius of where Elevenmile Creek dumped into the bay." Nevertheless, Dr. Livingston discounted much of this historical record, especially with regard to the belief that the mill's effluent had adversely affected Perdido Bay, because it was not based on what he considers reliable scientific data. He found "little evidence in the long- term sediment record of a direct response to historical activities of the pulp and paper mill, suggesting that the flushing capacity of Perdido Bay quickly diluted effluents that enter Perdido Bay from Elevenmile Creek." The evidence is persuasive that the salinity stratification in Perdido Bay is a major cause of low DO in the Bay.9 However, the stratification does not explain all of the observed changes in water quality, biological productivity, and recreational values. The stratification does not account for the markedly better conditions in the Bay that existed before the Cantonment paper mill began operations. The Livingston studies confirmed that when nutrient loadings from the mill were high, they caused toxic algae blooms and reduced biological productivity in Perdido Bay. As recently as 2005, there were major toxic blooms of heterosigma in Tee and Wicker Lakes caused by increased nutrient loading from the mill. Other competent evidence showed that the mill's effluent has created nuisance conditions in the past, such as foam and scum, which adversely affected the recreational values of these public waters. Some of the adverse effects attributable to the mill effluent were most acute in the area of the Bay near the Lanes' home on the northeastern shore of the Bay, because the flow from the Perdido River tends to push the flow from Elevenmile Creek toward the northeastern shore. Petitioners were justified in feeling frustrated in having their concerns about the adverse impacts of the mill's effluent discounted for many years, and in having to wait so long for an effective regulatory response. However, with regard to many of their factual disputes, Petitioners' evidence lacked sufficient detail regarding the dates of observations, the locations of observations, and in other respects, to distinguish the relative contribution of the mill effluent from other factors that contributed to the adverse impacts in the Bay, such as salinity stratification, natural nutrient loading from the Perdido River and other tributaries, and anthropogenic sources of pollution other than the paper mill.10 Petitioners generally referred to the mill effluent and its impacts to Perdido Bay as if they have been relatively constant for 65 years. The Livingston studies, however, showed clearly that the mill effluent and its impacts, as well as important factors affecting the impacts, such as drought, have frequently changed. Focusing on the fact that the average daily BOD loading allowed under the proposed permit would be same as under the 1989 TOP (4,500 ppd), Petitioners remarked several times at the final hearing that the proposed permit for the mill was no different than the existing permit. According to Petitioners, if the mill is allowed to operate under the proposed permit, one can predict that the future adverse impacts to Perdido Bay will be the same as the past adverse impacts. However, the 1989 TOP and the proposed permit are very different. Therefore, it cannot be assumed that the impacts would be the same. Petitioners' evidence was generally insufficient to correlate past adverse impacts to Perdido Bay with the likely impacts that would occur under the proposed permit. In contrast, that was the focus of the Livingston studies. Development of the WQBELs Whether Perdido Bay is an Alluvial System and Whether Elevenmile Creek is a Blackwater Stream Alluvial systems are generally characterized by relatively high nutrient inputs from tributaries and associated wetlands that provide for high biological productivity in the receiving bay or estuary. Petitioners disagree with Dr. Livingston's characterization of the Perdido Bay system as an alluvial system. Petitioners presented the testimony of Donald Ray, a Department biologist, who said that the Perdido River is not an alluvial river and the natural nutrient loadings to Perdido Bay are less than would occur in an alluvial system. Although it is curious that two experienced biologists cannot agree on whether Perdido Bay is part of an alluvial system, the dispute is immaterial because it was not shown by Petitioners that any of the four proposed Department authorizations is dependent on the applicability of the term "alluvial." The WQBELs developed by Dr. Livingston, for example, were not dependent on a determination that Perdido Bay meets some definition of an alluvial system, but were based on what the data indicated about actual nutrient loadings into Perdido Bay and the Bay's ecological responses to the loadings. If the dispute is not immaterial, then Dr. Livingston's opinion that Perdido Bay is part of an alluvial system is more persuasive, because he has greater experience and knowledge of the coastal bay systems on the Florida Panhandle than does Mr. Ray. Petitioners also take exception to Dr. Livingston's characterization of Elevenmile Creek as a blackwater creek. Petitioners claim Elevenmile Creek is naturally clear to "slightly tannic" stream. This dispute, however, is also immaterial because the proposed permit calls for the termination of the mill's discharge to Elevenmile Creek, including its contribution of color to the Creek. Petitioners assert that Dr. Livingston's characterizations of Perdido Bay as an alluvial system and Elevenmile Creek as a blackwater creek show he is biased and that his "overall analysis" lacks credibility. Dr. Livingston's opinions on these points do not show bias nor compromise the credibility of his overall analysis of the Perdido Bay system, which is actually the product of many scientists and based on 18 years of data.11 2. Selection of 1988 and 1989 Mill Loadings as a Benchmark for the WQBELs Generally, the Department establishes effluents limits for nutrients based on Chlorophyl A analysis. However, the Livingston studies showed that Chlorophyl A was not significantly associated with plankton blooms in Perdido Bay. Therefore, the Department accepted Dr. Livingston's recommendation to base the WQBELs for nutrients on the nutrient loading from the mill in 1988 and 1989, which the Livingston studies showed were good years for Perdido Bay with respect to its biological health. Phytoplankton are a fundamental component of the food web in Perdido Bay. The number of phytoplankton species is a sensitive indicator of the overall ecological health of the Bay. The Livingston studies showed that the loadings of ammonia and orthophosphate from the mill had a direct effect on the number of phytoplankton species. In the years when the mill discharged high loadings of ammonia and orthophosphate, there were toxic algae blooms and reduced numbers of phytoplankton species. In 1988 and 1989, when the loadings of ammonia and orthophosphate were lower, there were no toxic algae blooms, and there were relatively high numbers of phytoplankton species. Petitioners dispute that 1988 and 1989 are appropriate benchmarks years for developing the WQBELs because Petitioners claim there were high nutrient loadings and algae blooms in those years. Mr. Ray testified that the Department received citizen complaints about algae blooms in those years. Dr. Livingston's analysis was more persuasive, however, because it distinguished types of algae blooms according to their harmful effect on the food web and was based on considerably more water quality and biological data. Petitioners also presented water quality data collected from 1971 to 1994 by the Bream Fishermen Association at one sampling station in the northeastern part of Perdido Bay, which indicate that in 1988 and 1989, the concentrations of nutrients were sometimes high. The proposed nutrient WQBELs were derived from data about the actual response of the Perdido Bay ecosystem over time to various inputs. The sampling data from the Bream Fishermen Association were not correlated to ecosystem response and, therefore, are insufficient to refute Dr. Livingston's evidence that 1988 and 1989 were years of relatively high diversity and productivity in Perdido Bay. Furthermore, nutrients loadings would be reduced under the proposed permit. 3. DO and Sediment Oxygen Demand The parties agreed that sediment oxygen demand (SOD) is a major reason for the low DO in Perdido Bay in areas where there is salinity stratification. SOD is caused by the bacterial degradation of particulate organic matter that settles to the bottom. SOD decreases DO in the lower water layer, but also can cause a reduction of DO in the surface layer. Low DO has substantially reduced the biological productivity of Perdido Bay. Thomas Gallagher, an environmental engineer and water quality modeling expert, showed that even without the mill discharge, DO in the bottom waters of Perdido Bay would fall below the applicable Class III water quality standard of 5 mg/l. Low DO conditions are now a "natural" characteristic of the Bay, usually occurring during summer and early fall when freshwater flows are low and temperatures are high. At these times, surface water DO levels are usually above the state standard, but DO in the bottom waters usually range between 1.0 and 2.0 mg/l. Petitioners claim that the dominant source of the sediment in Perdido Bay is the carbon and nutrient loading in the mill's effluent that flows into the Bay from Elevenmile Creek. Mr. Ray, who sampled sediments in Perdido Bay over several years for the Department, believes that the mill effluent is the main source of the sediment and, consequently, the sediment oxygen demand. Dr. Livingston did extensive sediment analyses in Perdido Bay. He compared the data with sediment data from other bays on the Florida Panhandle. It is Dr. Livingston's opinion that the mill effluent contributes little to the sediments or SOD in Perdidio Bay. His initial three-year study concluded: [T]he hypoxic conditions of Elevenmile Creek are due, in part, to mill discharges. However, low dissolved oxygen conditions at depth in Perdido Bay are not due to the release of mill effluents from Elevenmile Creek, and can actually be attributed to a long history of human activities that include alteration of the hydrological interactions at the gulfward end of the estuary. The entry of saline water from the Gulf and the resulting stratification have been coupled with various forms of human development that release carbon, nitrogen, and phosphorus compounds into the estuary. The landward movement of high-salinity water from the Gulf of Mexico, laden with various types of oxygen-consuming compounds from various sources, together with oxygen demand from sediments to the lower water column that is isolated from reaeration due to salinity stratification, are thus responsible for a large portion of the observed hypoxic conditions at depth in Perdido Bay. [The paper mill] is responsible for a relatively small amount of these oxygen-consuming effects. In East Bay, which is a part of Escambia Bay and a relatively pristine system, there was SOD that caused DO to fall below standards in the lower water layer. Dr. Livingston also found severe oxygen deprivation at times in the lower waters of the Styx River and Perdido River, which do not receive mill effluent. Dr. Livingston believes the low DO that occasionally occurs in these rivers is due to agricultural runoff, urban discharges, and natural organic loading from adjacent wetlands. There was extensive evidence, some of which was presented by Petitioners, showing that the mill loadings of carbon and nutrients are less than the loadings from the Perdido River. Mr. Gallagher concluded that the sediment in the Bay is mostly "terrestrial carbon," and not from the mill's effluent. His water quality modeling work determined that the mill's effluent reduced bottom layer DO by about 0.1 mg/l. Dr. Lane believes that the organic solids in the mill's effluent are accumulating in Perdido Bay sediments, but Mr. Gallagher pointed out that degrading solids cannot accumulate because they are degrading. In addition, Mr. Gallagher said that logic dictates that solids that have not settled out after spending several days in the settling basins of IP's WWTP are not going to readily settle in the more turbulent environment of Perdido Bay. Some of the solids are oxidizing or being transported into the Gulf. Mr. Gallagher determined that in summer and late fall, 60 percent of the water in the bottom layer in the upper Bay is from the Gulf and almost all the rest is from the Perdido River. He believes only 0.1 to 2.0 percent of the water in the bottom layer is mill effluent. Dr. Livingston responded to the BOD and carbon issues that "these Petitioners raised over the years" by investigating them as part of the Livingston studies. He found no relationship between loading and DO. Dr. Livingston concluded that the mill was not having much effect on SOD. Dr. Livingston and Mr. Gallagher referred to a carbon isotope study of the sediment in Perdido Bay by Coffin and Cifuentes. The isotope study was a part of the initial three-year Livingston study entitled "Ecological Study of the Perdido Bay Drainage System." The study identified a unique carbon isotope in the mill's effluent and looked for traces of the isotope in the sediments of Perdido Bay. Very little of the carbon isotope was found in the sediments, suggesting that the mill's effluent was not contributing much to the sediments. The carbon isotope study was not offered into evidence. Petitioners assert that the isotope study is hearsay and cannot be used to support a finding of fact.12 However, Dr. Livingston's opinion about the sources of the sediment was not based solely on the isotope study. The isotope study was consistent with his other studies and with Mr. Gallagher's water quality modeling analysis. Therefore, the conclusions of the isotope study serve to support and explain Dr. Livingston's expert opinion that the mill effluent is not the primary source of the sediment and low DO in Perdido Bay. Dr. Livingston summarized his opinion regarding DO and SOD as follows: "all of these lines of evidence, from all the bays that I have worked in and from them scientific literature and from our own studies, every line of evidence simply eliminated the pulp mill as the primary source of the low dissolved oxygen in the bay." 4. Long-term BOD BOD is a measurement of the oxygen demand exerted by the oxidation of carbon, nitrogen, and the respiration of algae. A five-day BOD analysis is the standard test used in the regulatory process. The use of the standard five-day BOD measurement is not restricted to organic material that is expected to completely degrade in five days. Five days is simply the time period selected to standardize the measurement. For example, the five-day BOD analysis is used in the regulation of domestic wastewater even though most of the organic material in domestic wastewater takes about 60 days to degrade and would exert an oxygen demand throughout the 60 days. It was undisputed that paper mill effluent will continue to consume DO after five days. One estimate given was that it would take 100 days to completely degrade. Some of the naturally occurring organic material flowing into Perdido Bay from the Perdido River and Gulf of Mexico would also include material with long-term BOD. Petitioners claim that long-term BOD analysis is essential to determine the true impacts of the mill's effluent on Perdido Bay, but they failed to show that the Livingston studies did not consider long-term BOD.13 The evidence shows that Dr. Livingston's studies accounted for DO demand in all its forms and for any duration. Dr. Livingston's studies focused on the response of Perdido Bay's food web to nutrients and various other inputs as they changed over time. If long-term BOD was having an adverse effect on the food web, the Livingston studies were designed to detect that effect. Dr. Livingston's opinion is that long-term BOD is not a significant problem for Perdido Bay because the Bay is part of a dynamic system and the sediments are regularly flushed out or otherwise recycled in a matter of a few months, not years.14 5. Carbon Dr. Lane, who is a marine biologist, believes a major reason for low DO in Perdido Bay is "organic carbonaceous BOD." However, Dr. Lane presented no evidence other than statements of the theoretical process by which carbon from the mill would cause low DO in the Bay. She presented no scientific data from Perdido Bay to prove her theory.14 Dr. Livingston said that 16 years of studies in the Bay have found DO and carbon to be "totally uncorrelated." Other Water Quality Issues 1. Toxicity Petitioners allege that the mill effluent has had occasional problems passing toxicity tests. Un-ionized ammonia is the likely cause, and the reduction of un-ionized ammonia in the proposed permit and the distribution of the effluent over the wetland tract should prevent toxicity problems from recurring. Dr. Livingston examined tissue samples from various fish and invertebrates and found low levels of bioconcentrating chlorine compounds in Perdido Bay that he believes were "probably associated with discharges from the Pensacola mill." Although they are toxic substances, Dr. Livingston found no diseased organisms and no evidence of food web magnification of these potentially bioaccumulable compounds. Mr. Ray testified that Perdido Bay was the worst of all the bays he has studied in terms of high sediment metals. Most of his sediment sampling was done in 1977 through 1983, years before the Livingston studies got started. His knowledge about subsequent years was based on only two samples, one in 1988 and another in 2005.16 Dr. Lane did an analysis of 12 sediment samples in Perdido Bay, Perdido River, and Elevenmile Creek in 1999 and concluded that "Eleven Mile Creek appears to be the source of all elevated levels [of metals] except silver." The Livingston studies included toxics analysis of Perdido Bay sediments, including metals, dioxin, and other chlorinated organic compounds. Dr. Livingston testified that metal concentrations in the sediments of Elevenmile Creek did not differ from the metal concentrations in the Perdido River and other streams in the area. The concentrations were not significantly different from concentrations in other bays he has studied that do not have a paper mill discharge. 2. Mutagenic Compounds Petitioners claim that there are chemicals in paper mill effluent that are mutagenic and are causing changes in the sex of fish. They introduced an exhibit from the Department's exhibit list (DEP Exhibit 38) that discussed investigations of effluent from the Cantonment mill and other Florida paper mills which found abnormally high testosterone levels and related mutations in female Gambusia fish. The most recent such study16 implicates androgens produced by the microbial degradation of natural chemicals in the trees pulped at the mills, especially softwood trees (pines), as the cause. Petitioners believe IP's proposal to begin using 100 percent pine at the Cantonment mill could cause mutations in fish and other animals exposed to the mill's effluent. Although IP and the Department are aware of the sex change studies, there was no evidence presented that the subject was investigated or addressed by them in the permitting process. DEP Exhibit 38 is hearsay and no non-hearsay evidence was presented on the issue of mutagenic compounds in the mill's effluent. Therefore, no finding of fact in this Recommended Order can be based on the data and analysis in DEP Exhibit 38.18 Furthermore, Petitioners did not raise the issue of mutagenic compounds in the mill's effluent discharge in their petitions for hearing or in the pre-hearing stipulation.19 Antidegradation Policy Petitioners claimed the proposed permit violated the antidegradation policy for surface waters established in Florida Administrative Code Rule 62-302.300(1). An element of that policy is to require, for any discharge that degrades water quality, a demonstration that the degradation is necessary or desirable under circumstances which are clearly in the public interest. Florida Administrative Code Rule 62-4.242(1)(a) contains a list of factors to be considered and balanced in applying the antidegradation policy. These include consideration of whether the proposed project would be beneficial to public health, safety, or welfare and whether the discharge would adversely affect the, conservation of fish and wildlife, and recreational values. The greater weight of the evidence supports the position of IP and the Department that the proposed discharge to the wetland tract would be an improvement over the existing circumstances. However, as discussed below, there was an insufficient demonstration that the discharge would not cause significant adverse impact to the biological community within the wetland tract, and there was an insufficient demonstration that the Perdido River OFW would not be significantly degraded. Without sufficient demonstrations on these points, it is impossible to find that the degradation has been minimized. Petitioners did not prove that the proposed project was not in the public interest, but the burden was on IP to show the opposite. Because IP did not make a sufficient demonstration regarding potential adverse impacts on the biological community within the wetland tract and on the Perdido River OFW, IP failed to prove compliance with Florida's antidegradation policy. Perdido River OFW Florida Administrative Code Rule 62-302.300(2) contains the standards applicable to OFWs and prohibits a discharge that significantly degrades an OFW unless the proposed discharge is clearly in the public interest or the existing ambient water quality of the OFW would not be lowered.20 Petitioners contend that the water quality of the Perdido River would be significantly degraded by the mill's effluent under the authorizations. Mr. Gallagher's modeling analysis predicted improved water quality in the Perdido River for DO and several other criteria over the conditions that existed in 1979, the year the river was designated as an OFW. However, the modeling also predicted that the discharge would reduce the DO in the river (as it existed in 1979) by .01 mg/l under unusual conditions of effluent loading at the daily limit (based on a monthly average) during a drought. Mr. Gallagher's modeling indicated that a very small (less than 0.1 mg/l) reduction in DO in the surface water of the lower Perdido River would occur as a result of the proposed project. He considered that to be an "insignificant" effect and it was within the model's range of error. However, IP made the wrong comparisons in its modeling analysis to determine compliance with the OFW rule, Florida Administrative Code Rule 62-4.242(2). Mr. Gallagher used the model to compare the DO levels in the Perdido River that would result from the mill's discharge of BOD at the proposed permit limit of 4,500 ppd with the predicted DO levels that would have existed in 1979 if St. Regis was discharging 5,100 ppd of BOD. IP should have compared the DO levels resulting from the proposed permit with the actual DO levels in 1979, or at least the DO levels that the model would have simulated using actual BOD loadings by St. Regis in 1979. The DO levels that would have existed in 1979 if St. Regis had discharged 5,100 ppd of BOD are irrelevant. No DO data from 1979 were presented at the hearing and no explanation was given for why DO data for 1979 were not used in the analysis. No evidence was presented that St. Regis discharged 5,100 ppd of BOD as a monthly average in 1979.21 It might have discharged substantially less.22 Petitioners did not prove that the proposed permit would significantly degrade the Perdido River, but the burden was on IP to show the opposite. Because the wrong anti-degradation comparison was made, IP failed to provide reasonable assurance that the Perdido River would not be significantly degraded by the proposed discharge. The Experimental Use of Wetlands Exemption Petitioners claim that IP did not demonstrate compliance with all the criteria for the experimental use of wetlands exemption. There are seven criteria set forth in Florida Administrative Code Rule 62-660.300(1)(a) that must be met to qualify for the exemption. IP is seeking a waiver from two of the criteria and those will be discussed later in this Recommended Order. Impact on the Biological Community a. In General Florida Administrative Code Rule 62- 660.300(1)(a)1 requires a demonstration that "the wetlands ecosystem may reasonably be expected to assimilate the waste discharge without significant adverse impact on the biological community within the receiving waters." Dr. Nutter used a "STELLA" wetland model to predict the effects of discharging mill effluent to the wetland tract. The STELLA model was programmed to evaluate the "water budget" for the wetland tract, as well as simulate the fate of nitrogen, phosphorus, and total dissolved solids (TDS). Petitioners contend that the STELLA model is too limited to adequately assess potential adverse impacts on the biological community, but the model was not the sole basis upon which Dr. Nutter formed his opinions. He also relied on relevant scientific literature, his general knowledge of wetland processes, and on his 40 years of experience in land treatment of wastewater. The STELLA model predicted that there would be about a 10 percent reduction in nitrogen and phosphorus. Dr. Nutter testified that that figure was a conservative prediction and the scientific literature suggests there could be a greater reduction. Wetlands are effective in processing TSS and BOD. Dr. Nutter ran the model with the proposed permit limits and the model predicted 90 to 95 percent BOD removal before the effluent reached berm 4. Dr. Nutter expected pH levels to be in the range of background levels in the wetlands, which vary between 6.5 and 8.0.23 Dr. Nutter predicts that in high flow conditions, there will be more DO in the water flowing from the wetlands into Tee and Wicker Lakes. During low flow conditions, he predicts no change in the DO level. Background DO levels in the wetland tract now range between and 5.0 mg/l. Mr. Gallagher's water quality modeling for Perdido Bay assumed that the water flowing from the wetland tract would have a DO level of 2.0 mg/l, which Dr. Nutter believes this is a conservative estimate, meaning it could be higher. Specific Conductance A fundamental premise of the relocated discharge is that it solves the mill's decades-long failure to meet the stricter water quality standards applicable in the fresh waters of Elevenmile Creek because the new receiving waters would be marine waters. However, the majority (about 70 percent) of the wetland tract is a freshwater wetland. The tidal influence does not reach above berm 4 in the wetland tract. Before the mill's effluent reaches marine waters, it would be distributed over the entire freshwater portion of the wetland tract. Dr. Livingston explained that, but for the mill's discharge, minnows and other small "primary" freshwater fish species would be found in Elevenmile Creek. The primary fish cannot tolerate the mill's discharge because the high levels of sodium chloride and sulfide (specific conductance) cause osmoregulatory problems, disrupting their blood metabolism and ion regulation. High conductivity also eliminates sensitive microinvertebrates. Because Tee and Wicker Lakes are in the tidally influenced, southern portion of the wetland tract, the fish and other organisms in the lakes are polyhaline, which means they are adapted to rapid changes in salinity, temperature and other habitat features. That is not true of the organisms in the freshwater area of the wetland tract. A constructed wetlands pilot project was built in 1990 at the Cantonment mill. The initial operational phase of the pilot project was July 1991 through June 1993. A second phase was conducted for just three months, from September 1997 through December 1997. The pilot project generated some information about "benthic macroinvertebrate diversity," which was "low to moderate." In addition, there were "observations" made of "three amphibian species, three reptile species, approximately 31 bird species, three fish species that were introduced, and two mammal species." The information generated by the pilot project is ambiguous with respect to the effect of the effluent on fish and other organisms attributable to the specific conductance of the effluent, indicating both successes and failures in terms of survival rates. Moreover, the data presented from the pilot wetland project lacks sufficient detail, both with respect to the specific conductivity of the effluent applied to the wetlands and with respect to the response of salt-intolerant organisms to the specific conductivity of the effluent, to correlate the findings of the pilot project with the proposed discharge to the wetland tract. Freshwater wetlands do not have naturally high levels of specific conductance. The specific conductance in the wetland tract is 100 micromhos/cm or less.24 The proposed interim limit for specific conductance for the discharge into the wetland tract is "2,500 micromhos/cm or 50% above background, whichever is greater." Using total dissolved solids (TDS) as a surrogate for analyzing the effects on specific conductance, Dr. Nutter predicted that average TDS effluent concentrations would only be reduced by 1.0 percent.25 His prediction is consistent with the literature on the use of wetlands for wastewater treatment, which indicates wetlands are not effective in reducing TDS and specific conductance. The wetland tract would not assimilate TDS in mill's effluent. The potential exists, therefore, for the discharge to cause specific conductance in the freshwater area of the wetland tract to reach levels that are too high for fish and other organisms which can only live, thrive, and reproduce in waters of lower specific conductance. It was the opinion of Barry Sulkin, an environmental scientist, that the "freshwater community" would be adversely impacted by the salts in the effluent. Although the freshwater area of the wetland tract is not dominated by open water ponds, creeks, and streams,26 the evidence shows that it contains sloughs, creeks, and other surface water flow. No evidence was presented about the biological community associated with the sloughs, creeks, and other waters in the wetland tract, other than general statements about the existing plants and the trees that are being planted. Petitioners did not prove that granting the exemption would cause significant adverse impact to the biological community in the freshwater area of the wetland tract, but it was IP's burden to affirmatively demonstrate the opposite. Because IP did not adequately address the impact of increased specific conductance levels on fish and other organisms in the freshwater area of the wetland tract, IP did not provide reasonable assurance that the proposed discharge would be assimilated so as not to cause significant adverse impact on the biological community within the wetland tract. Tee and Wicker Lakes When the Department issued the proposed exemption order, it did not have sufficient data and analyses regarding Tee and Wicker Lakes to determine with reasonable confidence that these waterbodies would not be adversely impacted by the proposed discharge. A transparency study of the lakes, which IP introduced as an exhibit at the final hearing, had not previously been reviewed by Department staff. Dr. Livingston is still developing data and analyses for the lakes to use in the NSAI analysis. The proposed NSAI monitoring plan states that one of its objectives is to determine the "ecological state" of the tidal ponds, including whether the ponds "could comprise an important nursery area for estuarine populations." In addition, the monitoring is to determine "the normal distributions of salinity, temperature, color, and dissolved oxygen" in the tidal ponds. These are data that must be known before a determination is possible that the discharge would not have a significant adverse impact on the biological community associated with the lakes. Petitioners did not prove that granting the exemption would cause significant adverse impact to the biological community of Tee and Wicker Lakes, but it was IP's burden to affirmatively demonstrate the opposite. Because insufficient data exists regarding baseline conditions in Tee and Wicker Lakes, IP did not provide reasonable assurance that the proposed discharge would not cause significant adverse impact on the biological community within the wetland tract. 2. Public Interest and Public Health Florida Administrative Code Rule 62- 660.300(1)(a)2. requires the applicant to demonstrate that "granting the exemption is in the public interest and will not adversely affect public health or the cost of public health or other related programs." Public Interest Petitioners made much of a statement by Mr. Evans that the public interest consideration in this permit review was “IP’s interest”. Petitioners claimed that this statement was an admission by the Department that it gave no consideration to the public interest. However, in context, Mr. Evan's statement was not such an admission. Moreover, Florida Administrative Code Rule 62-302.300(6) expressly provides that the public interest is not confined to activities conducted solely for public benefits, but can also include private activities conducted for private purposes. The proposed exemption order does not directly address the public interest criterion, but it notes that "existing impacted wetlands will be restored." In IP's application for the exemption, it states that the exemption would "contribute to our knowledge of wetlands in general and to the refinement of performance guidelines for the application of pulp mill wastewater to wetlands." Petitioners dispute that the wetland tract is being restored. The evidence shows that some restoration would be accomplished. The natural features and hydrology of the tract have been substantially altered by agriculture, silviculture, clearing for pasture, ditching, and draining. The volume of flow in the discharge would offset the artificial drainage that occurred. A mixture of hardwood tree species would be planted, which would restore more of the diversity found in a natural forested wetland. However, an aspect of the project that could substantially detract from the goal of restoration is the transformation of the freshwater wetlands to an unnatural salty condition. Dr. Nutter said that the salt content of the mill's effluent was equivalent to Gatorade, but for many freshwater organisms, that is too salty. Another public benefit of the exemption that was discussed at the final hearing is that it would allow IP to relocate its discharge from Elevenmile Creek and thus end its adverse impacts to the Creek. That public benefit is not given much weight because IP has not shown that its adverse impacts to Elevenmile Creek cannot be eliminated or substantially reduced by decreasing its production of paper products. The evidence shows only that IP has attempted to solve its pollution problems through environmental engineering.27 A sufficient public interest showing for the purpose of obtaining the experimental use of wetlands exemption should not be a rigorous challenge if all the other exemption criteria are met, because that means the proposed wetland discharge was shown to have no harmful consequences. The public interest showing in this proceeding was insufficient, however, because the other exemption criteria were not met and there is a reasonable potential for harmful consequences. Public Health Petitioners raised the issue of the presence of Klebsiella bacteria, which can be a public health problem when they occur at high levels. The more detection of Klebsiella, however, does not constitute a public health concern. Petitioners did not show that Klebsiella bacteria exist in the mill's effluent at levels that exceed applicable water quality standards. Petitioners also did not present competent evidence about the likely fate of Klebsiella bacteria in the proposed effluent distribution system. Dr. Lane's statement that Klebsiella bacteria might be a problem is not sufficient to rebut IP's prima facie showing that the proposed permit will not cause or contribute to a violation of water quality standards applicable to pathogenic bacteria. Petitioners also point to past incidents of high total coliform concentrations in Elevenmile Creek in support of their contention that the proposed exemption poses a risk to public health. However, these past incidents in Elevenmile Creek are not sufficient to prove that fecal coliform in the effluent discharged to the wetland tract will endanger the public health. IP proposes to restrict access to the wetland distribution system. Furthermore, the fate of bacteria in the wetlands is much different than in the Creek. The more persuasive evidence is that the wetland tract would destroy the bacteria by solar radiation and other mechanisms so that bacteria concentrations in waters accessible by the public would not be at levels which pose a threat to public health. Protection of Potable Water Supplies and Human Health Florida Administrative Code Rule 62- 660.300(1)(a)5. requires the applicant for the exemption to demonstrate that "the presently specified criteria are unnecessary" to protect potable water supplies and human health, which presupposes that the applicant has applied for an exemption from water quality criteria applicable to human health. IP has not requested such an exemption and, therefore, this particular criterion appears to be inapplicable. Even if it were applicable, the evidence does not show that the effluent would cause a problem for potable water supplies or human health. 4. Contiguous Waters Florida Administrative Code Rule 62- 660.300(1)(a)6. requires a showing that "the exemption will not interfere with the designated uses of contiguous waters." Contiguous waters, for the purpose of this criterion, would be Elevenmile Creek, Perdido Bay, and the Perdido River. Petitioners argue that Tee and Wicker Lakes should be considered contiguous waters for the purpose of this criterion of the exemption rule. However, Tee and Wicker Lakes are within the exempted wetland tract so they are not contiguous waters. Petitioners contend that IP failed to account for the buildup of detritus in the wetlands and its eventual export to Perdido Bay. Their contention is based primarily on the opinion of Dr. Kevin White, a civil engineer, that treatment wetlands must be scraped or burned to remove plant buildup. However, Dr. Nutter explained that periodic removal of plant material is needed for the relatively small "constructed wetland" treatment systems that Dr. White is familiar with, but should not be needed in the 1,464-acre wetland tract. Nevertheless, because IP did not provide reasonable assurances that the proposed permit and related authorizations would not significantly degrade the Perdido River OFW, IP failed to meet this particular exemption criterion regarding interference with contiguous waters. 5. Scientifically Valid Experimental Controls Florida Administrative Code Rule 62- 660.300(1)(a)6. requires a showing that "scientifically valid environmental controls are provided . . . to monitor the long-term effects and recycling efficiency." Petitioners' argument about this particular criterion was largely misplaced. The term "environmental controls" modifies the term "monitor" and connotes only that the experiment would be monitored in a manner that will generate reliable information about long-term effects and performance. For monitoring purposes, IP's proposed NSAI protocol is an innovative and comprehensive plan that complies with this exemption criterion. Petitioners' objections to the lack of sufficient information about Tee and Wicker Lakes is more appropriately an attack on the sufficiency of IP's showing that its discharge would not cause a significant adverse impact on the biological community within the wetland tract. That issue was discussed above. 6. Duration of the Exemption Petitioners argue that the exemption can not exceed five years in duration, but the time schedules established by the proposed Consent Order and proposed permit would allow the exemption to be in effect for nine years. The Department's exemption order states that the five years does not begin to run until IP begins to discharge effluent at D-003 into the wetland tract. The possibility that IP might seek to renew the exemption after five years does not make the exemption something other than a five-year exemption. The Department's action on the request to renew the exemption would be subject to public review and challenge by persons whose substantial interests are affected. The Waiver The proposed waiver order would excuse IP from compliance with the criteria in Florida Administrative Code Rule 62-660.300(1)(a)3. and 4., which require that public access and recreation be restricted in the area covered by the exemption for experimental use of wetlands. Without the waiver, the public would have to be excluded from Tee and Wicker Lakes. Section 120.542, Florida Statutes, requires a showing by the person seeking the waiver that the purpose of the underlying statute will be achieved by other means and the application of a rule would create a substantial hardship or would violate principles of fairness. Petitioners contend that IP failed to demonstrate substantial hardship. However, Petitioners do not want public access to Tee and Wicker Lakes restricted. The sole reason for their objection to the proposed waiver is apparently to thwart the issuance of the exemption. Section 120.542, Florida Statutes, defines "substantial hardship" as a demonstrated economic, technological, legal, or other type of hardship to the person requesting the waiver. In the proposed waiver order, the Department identifies IP's hardship as the possibility that denial of the waiver could result in denial of IP's NPDES permit and closure of the mill. The proposed waiver order then describes the number of jobs and other economic benefits of the mill that would be lost if the mill were closed. As discussed in the Conclusions of Law below, the Department's interpretation of Section 120.542, Florida Statutes, to accept a demonstration of hardship that is associated with denial of the waiver is mistaken. The statute requires that the hardship arise from the application of the rule. In this case, IP must demonstrate that it would suffer substantial hardship if it were required to restrict public access and recreation on Tee and Wicker Lakes. Petitioners claimed that IP has no authority to restrict the public from gaining access to Tee and Wicker Lakes because those are public waterbodies which the public has a right to enter and use. A substantial legal hardship for IP in complying with the exemption rule, therefore, is that compliance is impossible. The Consent Order 1. Compliance Schedule Subsections 403.088(2)(d) and (e), Florida Statutes, provide that no permit shall be issued unless a reasonable schedule for constructing, installing, or placing into operation of an approved pollution abatement facility or alternative waste disposal system is in place. Petitioners claim the time schedules for compliance are not reasonable. Petitioners presented no competent evidence, however, that the WWTP upgrades, pipeline construction, and other activities required by the proposed permit can be accomplished in a shorter period of time. One recurring theme in the Petitioners' case was that the adverse impacts associated with the continued discharge to Elevenmile Creek should not be allowed to continue, even for an interim period associated with construction of the WWTP upgrades and effluent pipeline. However, Petitioners also advocated the relocation of the discharge to the Escambia River, or to a "constructed wetlands." Both of these alternatives would have required a transition period during which the discharge to Elevenmile Creek would likely have continued. Furthermore, the Consent Order imposes interim limits on the discharge to Elevenmile Creek that would apply immediately upon issuance of the proposed permit. Although altered by the mill's effluent discharge, Elevenmile Creek is now a relatively stable biological system. The proposed permit would effectuate some improvement in the creek and Perdido Bay even during the construction phase. 2. Contingency Plan The proposed Consent Order includes a contingency plan in the event that the NSAI monitoring analysis shows adverse impacts to the biological community within the wetland tract. The plan provides for alternative responses including relocating all or part of the wetland discharge to Elevenmile Creek. Petitioners object to the plan, primarily because they contend it is vague. The provisions in the contingency plan for relocating all or part of the discharge from the wetland tract to Elevenmile Creek, appear to reflect a presumption that the negatives associated with continued discharge to the wetlands would outweigh the negatives associated with returning the discharge to Elevenmile Creek. However, it is not difficult to imagine scenarios where the harm to the biological community of the wetland tract is small in relationship to the harm to the biological community that might have reestablished itself in Elevenmile Creek. Because the selection of an alternative under the contingency plan requires the consideration of data and analyses associated with future events, it is impossible to know at this time whether future action taken by the Department and IP pursuant to the contingency plan would be reasonable. If the contingency plan is intended by the Department and IP to authorize future action when circumstances described in the plan are present, then the plan is too vague. On the other hand, there is adequate detail in the plan if the purpose of the plan is merely to establish a framework for future decision-making that would be subject to permit modification, public review and challenge. Clarification is needed. 2. Penalties Petitioners complained that the stipulated of $500 per day for violations of the proposed Consent Order is too small to provide a deterrent to a company of the size of IP. Petitioners are correct, but did not present evidence to show what size penalty would be appropriate.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Department of Environmental Protection enter a final order: Denying proposed revised NPDES Permit Number FL0002526- 001/001-IW1S; Disapproving revised Consent Order Number 04-1202; Denying IP's petition for authorization for the experimental use of wetlands; and Denying IP's petition for waiver. DONE AND ENTERED this 11th day of May, 2007, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 2007.