CONSTRUCTION INDUSTRY LICENSING BOARD vs. STEPHEN J. BOROVINA, 77-001442 (1977)
Division of Administrative Hearings, Florida Number: 77-001442 Latest Update: Feb. 21, 1978

The Issue The Florida Construction Industry Licensing Board, Petitioner, seeks to revoke the registered contractor's license of Stephen J. Borovina, Respondent, based on allegations, which will be set forth in detail hereafter, that he engaged in conduct violative of Chapter 468, Florida Statutes. The issue presented is whether or not the Respondent aided or abetted and/or knowingly combined or conspired with Mr. Howard North, an uncertified or unregistered contractor, to evade the provisions of Chapter 468.112(2)(b), and (c), Florida Statutes, by allowing North to use his certificate of registration without having any active participation in the operations, management, or control of North's operations. Based on the testimony adduced during the hearing and the exhibits received into evidence, I make the following:

Findings Of Fact The Respondent is a certified general contractor who holds license no. CGC007016, which is current and active. On or about July 25, 1976, Mr. and Mrs. Julius Csobor entered into a contract with Mr. and Mrs. Howard North for the construction of a home in Martin County, Florida, for a total price of $35,990. Neither Mr. or Mrs. North are certified or registered contractors in the State of Florida. (Petitioner's Composite Exhibit #2). Respondent applied for and was issued a permit by the Martin County Building Department to construct a residence for the Csobors at the same address stipulated in the contract between the Csobors and the Norths, i.e., Northwest 16th Street, Palm Lake Park, Florida. (Petitioner's Composite Exhibit #1). Howard North, a licensed masonry contractor for approximately nine (9) years was contacted by the Csobors through a sales representative from a local real estate firm. It appears from the evidence that North had previously constructed a "spec" house which the local realtor had sold and thus put the Csobors in contact with Mr. North when they were shown the "spec" house built by North. Evidence reveals that North contacted Borovina who agreed to pull the permit "if he could get some work from the job and could supervise the project". Having reached an agreement on this point, North purchased the lot to build the home for the Csobors and he orally contracted with the Respondent to, among other things, pull the permit, supervise construction, layout the home and do trim and carpentry work. North paid Respondent approximately $200 to layout the home for the Csobors. By the time that North had poured the slab and erected the subfloor, the Csobors became dissatisfied with his (North's) work and demanded that he leave the project. According to North, Respondent checked the progress of construction periodically. Prior to this hearing, the Csobors had never dealt with Respondent in any manner whatsoever. According to Csobor, North held himself out as a reputable building contractor. A contractor is defined in relevant part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. . . . real estate for others. . . Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby recommended that the complaint filed herein be dismissed in its entirety. RECOMMENDED this 4th day of November, 1977, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings 530 Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry S. Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Stephen J. Borovina 2347 Southeast Monroe Street Stuart, Florida 33494 J. Hoskinson, Jr. Chief Investigator Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 STEPHEN J. BOROVINA, CG C007016, 2347 S. E. Monroe Street, Stuart, Florida 33494, Respondent. / This cause came before the FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD at its regular meeting on February 10, 1978. Respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did not appear The FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD on February 10, 1978, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded voted to revoke the certified general contractor's license of STEPHEN J. BOROVINA. It is therefore, ORDERED that the certification of respondent STEPHEN J. BOROVINA, Number CG C007016, be and is hereby revoked. Respondent is hereby notified that he has 30 days after the date of this final order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. DATED this 13th day of February, 1978. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President ================================================================= SECOND AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD STEPHEN J. BOROVINA, CG C007016, Respondent/Appellant, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner/Appellee. / This cause came before the Florida Construction Industry Licensing Board at its regular meeting on August 3, 1979. The respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did appear. The Florida Construction Industry Licensing Board, on August 3, 1979, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded, voted to revoke the certified general contractor's license of Stephen J. Borovina, No. CG C007016. On February 13, 1978, the certification of respondent, Stephen J. Borovina, No. CG C007016, was revoked by order of the Florida Construction Industry Licensing Board. On April 25, 1979, the District Court of Appeal of the State of Florida, Fourth District, in Case Number: 78-527, reversed the final order of the Florida Construction Industry Licensing Board. That Court remanded the above captioned case to the Board to further consider the matter and enter such order as it may be advised in conformity with Section 120.57(1)(b)(9), Florida Statutes (1977). In accordance with the decision of the Florida District Court of Appeal, Fourth District, the Board has reconsidered the above captioned matter and finds as follows: The Board rejects the recommended order as the agency's final order. The Board adopts the first paragraph of the hearing officer's finding of fact. The Board, however, rejects the findings of fact found in the second paragraph of the hearing officer's findings. The second paragraph states as follows: A contractor is defined in relevent(sic) part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. real estate for others...Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety. The findings of fact found in the above-quoted paragraph were not based upon competent substantial evidence. The competent substantial evidence supports a finding that the respondent, Stephen J. Borovina, did not supervise the project and that Borovina evaded the provisions of Chapter 468, Florida Statutes. The following evidence supports the Board's position: There was no written agreement entered into between Howard North and the respondent which indicated that the respondent was to supervise the construction of the Csobors' house (T- 14); It was conceded at the hearing that the only subcontractors or draftmen who worked on the Csobors' house were contracted solely by Howard North and they had no contract whatsoever with the respondent (T-19, 25); The respondent never advised or informed Mr. and Mrs. Csobor that he was the contractor on the job. (T-51); At all times during the act of construction of the house, Mr. and Mrs. Csobor were under the impression that Howard North was the contractor (T-44-51). It is, therefore, ORDERED: That the certification of respondent, Stephen J. Borovina, Number CG 0007016, be and is hereby revoked. Respondent is hereby notified that he has thirty (30) days after the date of the Final Order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. Dated this 3rd day of August, 1979. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President

Florida Laws (1) 120.57
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE E. FELD, 86-004429 (1986)
Division of Administrative Hearings, Florida Number: 86-004429 Latest Update: Apr. 09, 1987

Findings Of Fact At all times relevant hereto, respondent, George E. Feld, held certified general contractor license number CG C021801 issued by petitioner, Department of Professional Regulation, Florida Construction Industry Licensing Board. Feld has been a licensed contractor in Florida since June 1982. He has qualified George E. Feld and Associates, Inc. under his license and operates the business at 2131 Northeast 205th Street, North Miami Beach, Florida. After submitting the low bid, on or about March 1, 1985 George Feld and Associates, Inc. entered into a contract with the City of Tamarac to construct a 5,500 square foot recreation building for the City. The negotiated contract price was $195,950. The contract called for commencement of the project within ten days after the contract was signed and completion by July 27, 1985. Sometime prior to March 20, 1985, Feld met one David P. McCall and Marvin Weiss at a motel in North Miami. McCall was interested in doing work on the Tamarac project. He gave Feld a business card with the name "Arrow Head Development Corporation, Inc." printed on it, and which stated the firm was "state certified" and "licensed" as a general contractor. Feld also noted that Weiss held a general contractor's license, and he assumed that McCall and Weiss were working together. Relying on McCall's card, and later representations by McCall, but without checking with petitioner's office to verify if McCall or Arrow Head were licensed or qualified, Feld agreed to subcontract out the shell and sewer work on the Tamarac project to Arrow Head. To this end, Feld and Arrow Head entered into two contracts on March 20, 1985, for Arrow Head to perform the shell and sewer work. On June 21, 1985 McCall submitted a written "proposal" to Feld for the shell work on the job. The proposal had the following words and numbers typed on its face: "State License Number: #CGC 05961." It was not disclosed whose license number this was. Although McCall denied typing this document (because he does not personally know how to type), he did not deny that it was placed on the document at his direction or with his knowledge. It was not until sometime later that Feld learned that Arrow Head was not qualified by any licensee. Because of his mistaken belief that Arrow Head was qualified, Feld had never qualified that firm. Even so, there was no evidence that Feld intended to allow an unqualified firm to perform the work. Work proceeded on a timely basis as required by the contract. Feld visited the job site daily, and supervised all activities, including those performed by McCall. He routinely inspected the work, verified that it was being done according to specifications, and made corrections where needed. The job specifications called for trusses that were over forty feet in length. Because of this, and pursuant to the South Florida Building Code (Code), it was necessary for the City to hire an engineer to oversee their installation. The City hired one George Fink as engineer to supervise this phase of the project. However, Fink's responsibility was limited to just that, and once the installation was completed, Feld resumed responsibility for the remainder of the job. Trusses are a manufactured roof member and may vary in length, height and pitch. In this case, they were designed in the form of a cathedral roof, and were in excess of forty-seven feet in length. Further, because of the building's design, there were a number of trusses to be installed. The installation of the trusses was begun around 9:00 a.m. on Friday, June 27, 1985 and finished by 2:00 p.m. that same day. As required by the Code, Fink was present and supervised the installation of the trusses on the top of the shell. He confirmed at hearing that they were properly installed. The problem herein arose early that day when Fink had noticed that the building plans did not provide for lateral bracing of the trusses. However, according to Fink, this was not unusual since plans do not normally provide for lateral bracing. Even so, Fink told an unnamed person who "appeared to be the fellow running the erection crew" that lateral bracing should be added to the center and two side core members and that the four trusses on each end needed additional bracing. Fink also suggested to this unnamed individual that sheathing be added "as soon as possible" to the top and outside of the trusses to give added stability and protect them from wind damage and the like. In this regard, at hearing Fink conceded that it was "reasonable" for a contractor to erect trusses one day, and to place sheathing on them the following work day. Fink thought sheathing to be particularly necessary on this job since the trusses were high pitched," "long in length," and there were "no gables or anything in between to ... add any other support." By the end of the work day, the crew had placed the proper bracing on the trusses. However, no sheathing was applied. According to Fink, who was accepted as an expert in this proceeding, a prudent and competent contractor would be aware of the need for sheathing and added bracing because of the potential hazard of high winds caused by late afternoon thunderstorms in South Florida. By failing to place sheathing on the roof, Fink opined that Feld was grossly negligent and incompetent in the practice of construction on the Tamarac project. Sometime on late Sunday night or early Monday morning, most of the trusses on the roof collapsed. Some fell on an electrical wire running to the building. However, no injuries occurred. Only five trusses on the north side of the building remained in place. The City of Tamarac then filed a complaint with petitioner against Feld. The cause of the collapse was not disclosed, and even Fink was unable to state that the lack of sheathing was the cause of the accident. There was no evidence that strong winds or thunderstorms occurred on the night the trusses fell, or that bad weather was predicted when the work day ended on Friday afternoon. Feld acknowledged that no sheathing was placed on the trusses. He attributed this to the fact that the construction crew stopped work at 3:30 on Friday afternoon, and did not return to the job site until the following Monday morning. He intended to install the sheathing the following Monday but by then it was too late. This was in accord with the standard enunciated by Fink that it was not unreasonable for a contractor to erect trusses one day, and to place sheathing on them the following work day. Feld also stated that he was well aware of the need for bracing and sheathing on trusses by virtue of his long experience in the construction business. Feld hinted, but did not prove, that McCall may have been responsible for the accident because of bad blood between the two. In any event, he doubted that wind would have caused the trusses in question to fall. Finally, Feld pointed out that, even though city inspectors were present, no one had come to him on Friday afternoon and said the trusses might collapse over the weekend without sheathing. Feld is a graduate of the University of Buenos Aires with a degree in architecture, and has been engaged in the construction/architecture business for twenty-two years. He presently is an instructor of construction at Miami-Dade Community College. There is no evidence he has ever been the subject of a disciplinary action by the Board on any other occasion.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the administrative complaint against George E. Feld be DISMISSED, with prejudice. DONE AND ORDERED this 9th day of April, 1987, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of April, 1987.

Florida Laws (2) 120.57489.129
# 2
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs RONALD J. POWELL, 00-002938PL (2000)
Division of Administrative Hearings, Florida Filed:Lakeland, Florida Jul. 18, 2000 Number: 00-002938PL Latest Update: Mar. 12, 2001

The Issue Did Respondent commit the violations alleged in the Administrative Complaint dated April 11, 2000, and if so, what discipline is appropriate?

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: The Department is the agency of the State of Florida charged with the responsibility of regulating the practice of contracting pursuant to Section 20.165, Florida Statutes, and Chapters 455 and 489, Florida Statutes. Respondent is, and has been at all times material hereto, a certified residential contractor in the State of Florida, having been issued license number CR CO13253 by the Florida Construction Industry Licensing Board. At all times material hereto, Respondent was licensed with the Construction Industry Licensing Board as an individual. On or about November 20, 1993, Respondent entered into a written contractual agreement (contract) with Kevin Watkins (Watkins) to construct a single family residence at 126 Meadow Lark Boulevard, Lot 65, Indian Lake Estates, Florida. The contract price was $333,944.00. Between December 7, 1993, and February 1, 1996, Watkins and Respondent executed 102 addenda to the contract which increased the contract price by approximately $241,874.43, for a total amount of approximately $575.818.43. On or about December 9, 1993, Respondent obtained permit number 93-120l850 from the Polk County Building Department and commenced work on the project. The contract provided that the "project shall be substantially completed on or about 195 days from the date all building permits are issued." However, due to the 100-plus addenda to the contract, it was estimated that an additional 190 days would be needed to complete the project. Additionally, construction ceased on the home for approximately 60 days so that Watkins could explore the possibility of a construction loan. However, due to the extent of completion, the lending institutions decided not to make any construction loans. On or about May 27, 1996, Watkins moved to Florida with the expectations that his home would be completed within a short period of time. (Watkins' recollection was that the home was to be completed in a couple of weeks. Respondent's recollection was that the home was to be completed in a couple of months.) In any event, Respondent did not complete the Watkins home within a couple of weeks or a couple of months. After Watkins moved to Florida, Respondent paid for Watkins to live in a Best Western motel for a few weeks. Subsequently, Respondent moved Watkins into a rental home for which Respondent paid the rent through September 1996. Beginning October 1996 through July 1999, Watkins paid $600.00 per month for a total of $20,400.00 as rent on the rental home. In early 1998, Respondent and Watkins went through the home, identified those items which had not been completed and Respondent made a handwritten list of those items. Respondent failed to complete the items identified on the list. In fact, shortly thereafter, Respondent ceased working on the project and was unresponsive to attempts to contact him. At the time Respondent ceased working on Watkins' home, the home was approximately 75 percent complete. While this estimation of completion may not be totally accurate, it is the best that could be derived based on the evidence presented, including Respondent's testimony to which I gave some credence. Watkins paid Respondent $561,617.91, which represents approximately 97.534 percent of the total contract price plus addenda to the contract. Seventy-five percent of the contract price plus addenda to the contract equals $431,863.82 for an overpayment of $129,754.09. To date, Respondent has not returned any of the money he received from Watkins above the amount completed under the contract. From early 1998, until August 1998, when Watkins had Respondent removed as general contractor on the building permit, Respondent failed to perform any work on the home for a period in excess of 90 days. Respondent contracted with Jack Eggleston to install cabinets in Watkins home. Eggleston performed under the contract but Respondent failed to pay Eggleston in full, requiring Watkins to pay Eggleston $1,200.00. After Watkins' home was partially complete, Respondent advised Watkins that he had the home insured when in fact he did not have the home covered with insurance. While Respondent was building Watkins' home, Respondent and Watkins entered into a joint venture called Contractors of Central Florida to build modular homes sometime after January 1, 1995. Respondent contends that some of the checks Watkins claims as payment under the contract for his home, were in fact reimbursement to Respondent for funds he had advanced for the joint venture. There is insufficient evidence to establish facts to show that any of the checks Watkins claims as payment under the contract for his home were in fact reimbursement for funds advanced by Respondent for the joint venture. Up until the time of the final hearing, the Department had incurred costs for the investigation and prosecution of this matter, excluding costs associated with an attorney's time, in the amount of $1,451.28.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, and after careful review of the guidelines set forth in Rule 61G4-17.001(8) and (11), Florida Administrative Code, and the circumstances for purpose of mitigation or aggravation of penalty set forth in Rule 61G4-17.002, Florida Administrative Code, it is recommended that the Department: Enter a final order finding Respondent guilty of violating Section 489.129(1)(h)2., Florida Statutes, and imposing a penalty therefor an administrative fine in the amount of $1,000.00; Enter a final order finding Respondent guilty of violating Section 489.129(1)(k), Florida Statutes, and imposing a penalty therefor an administrative fine in the amount of $1000.00; Assessing costs of investigation and prosecution, excluding costs associated with an attorney's time, in the amount of $1,451.28, plus any such further costs which have or may accrue through the taking of final agency action and; Requiring Respondent to pay restitution to Kevin Watkins in the amount of $129,754.09 which represents the amounts accepted by Respondent for work not performed. DONE AND ENTERED this 23rd of October, 2000, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6947 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 23rd day of October, 2000. COPIES FURNISHED: Robert A. Crabill, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32388-2202 Ronald J. Powell Post Office Box 7043 Indian Lake Estates, Florida 33855 Rodney Hurst, Executive Director Construction Industry Licensing Board 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Barbara D. Auger, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (4) 120.5720.165489.1195489.129 Florida Administrative Code (2) 61G4-17.00161G4-17.002
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JAMES J. HASTINGS, 88-000730 (1988)
Division of Administrative Hearings, Florida Number: 88-000730 Latest Update: Nov. 23, 1988

Findings Of Fact Petitioner is the state agency charged with the responsibility to prosecute administrative complaints pursuant to Chapters 489, 455, and 120, Florida Statutes, and the rules promulgated pursuant thereto. At all times material to the Administrative Complaint, Respondent James J. Hastings was licensed as a certified general contractor in the State of Florida, holding license number CG C009847. At all times material hereto, Respondent was a qualifying agent for Hastings Construction Company, Inc. Respondent and Candace Reinertz are married. At all times material to the violations charged, she was operating under her maiden name for all purposes. At all times material hereto, Candace Reinertz was not licensed by the Florida Construction Industry Licensing Board, and the Respondent had knowledge thereof. Over several years, Ms. Reinertz regularly assisted Mr. Hastings in the operation of Hastings Construction Company, Inc., including day to day supervision of pool, small building, and house construction and pulling building permits for that corporation. She had been authorized in writing by Hastings to pull building permits for him on specific projects (not necessarily in a corporate name) at least since April 27, 1987. At all times material hereto, Castles `n' Pools, Inc., 205 Third Avenue, Melbourne Beach, Florida, was a firm that was not qualified with the Construction Industry Licensing Board, and Respondent had knowledge thereof. This corporation was intended to become a venture to be run jointly by husband and wife. Castles `n' Pools, Inc. had been qualified as a corporation with the Florida Secretary of State and had received an occupational license. The corporate officers/directors were Reinertz and Hastings. However, a Florida Construction Industry Licensing Board License was never applied for by Ms. Reinertz in her own name nor was one applied for by Mr. Hastings as a qualifier for Castles `n' Pools, Inc. On June 27, 1987, Castles `n' Pools, Inc., through Candace Reinertz, contracted with Zimmer Dominque for construction of a pool at Mr. Dominque's residence located at 866 Van Circle, N.E., Palm Bay, Florida, for $7,750. The contract promised completion of the pool by September 23, 1987, barring adverse weather and mishaps. It is Ms. Reinertz's testimony that she inadvertently filled in a Castles `n' Pools, Inc. blank contract when she intended to use a Hastings Construction Company blank contract. The blank forms are, indeed, very similar. Mr. Dominque's testimony is that he thought at all times that he was contracting with Castles `n' Pools, Inc., through Ms. Reinertz. Although he admits that at least by September 22, 1988, he considered Respondent in charge of the project and that he thereafter dealt directly with Respondent, Mr. Dominque's payment by checks made out to Castles `n' Pools and/or Candace Reinertz dated June 27, July 7, September 22, and September 24, 1987 (P-10) support a finding that all work to that point was progressing in the name of Castles `n' Pools. Also supportive of such a finding is that on July 6, 1987, Pyramid Equipment Service billed Castles `n' Pools for digging the hole for the pool (R-8) and on August 11, 1987, R & J Crane Service billed Castles `n' Pools for setting the pool in place (R-9). However, the issuance of the building permit to Hastings Construction Company, Inc. and the chronology of how the permit came to be issued (see infra.) suggest that Mr. Hastings did not know about the Castles `n' Pools connection until at least late September. Respondent's and Ms. Reinertz' testimony that Respondent did not find out that the wrong contract had been used until after construction was underway on the Dominque property is unrefuted and the exact date of his discovery was not demonstrated, but he admits he did not attempt to qualify Castles `n' Pools once he found out. On June 29, 1987, the Respondent authorized Candace Reinertz to pull a permit for the construction of a pool at Mr. Dominque's residence. The authorization, (P-12), does not specify either Castles `n' Pools nor Hastings Construction Company, Inc. as the construction corporation applicant. Ms. Reinertz's subsequent permit application was denied on July 2, 1987, by the Palm Bay Building Department, for failure to include a survey certified by a civil engineer or architect. The record does not reflect in what corporate name Ms. Reinertz made this initial application. She may not even have gotten as far as filling out a permit application before she was refused at the permit desk, but the line drawing prepared for that application (R-1) specifies that the line drawing was that of Hastings Construction Company, Inc. Mr. Hastings regularly did line drawings for Hastings Construction Company, Inc. projects on a particular machine in that corporation's offices. The certified survey requirement was a recent innovation of the Palm Bay Building Code. On July 6, 1987, Castles `n' Pools, Inc. delivered the prefabricated fiberglass pool, excavated the site and dropped the pool in the hole. No further efforts of permanent installation occurred at that time, due to failure to obtain a permit. A dispute then ensued between Hastings and Reinertz on one side and Mr. Dominque on the other over who must provide the survey and how. This dispute occasioned some delay in the project, but on July 26, 1987, Ms. Reinertz again applied, with a certified survey, to the Palm Bay Building Department for a permit for the construction of Mr. Dominque's pool, listing the builder as Hastings Construction Company, Inc. (P-5). On July 30, 1987, permit number 8702101 was issued by the Palm Bay Building Department for the construction of Mr. Dominque's pool by Hastings Construction Company, Inc. (P-6). Thereafter, work on the pool progressed sporadically until September 22, 1987, when the pool floated up out of the ground. The pool floated up out of the ground during a rainstorm and after Respondent had left Mr. Dominque with instructions to fill the pool to a certain level with water. There is sufficient evidence to demonstrate that Mr. Dominque failed to follow Respondent's directions with precision. Subsequent to September 22, 1987, the pool was reinserted in the excavation by crane and by October 2, 1987, the deck was installed. Two or three months later a crack appeared in the pool which has since been repaired, however, the drain and light still do not work properly, and Mr. Dominque had to pay an additional $50 for cleanup of the resulting debris. Some of the delay in completion of work on the pool can be attributed to the dispute about the survey, some to injury of a key employee, and some to heavy rains, but the testimony of Mr. Nasrallah, architect and expert contractor, is accepted that 30 to 45 days would be sufficient to install the entire pool except for the pool deck even in rainy weather. Also, Mr. Dominque's and Respondent's testimony is in agreement that Respondent (not Ms. Reinertz) was fired for a period of time and then rehired. The length of time and the dates that Respondent was off the job is unclear, but it was minimally from September 9 to September 22, 1987. Oversight of the work at all times was by the Respondent. Mr. Dominque has paid the total contract price of $7,750 and expressed himself that any amount he questioned has either "evened out" or been paid back by Respondent. Stan Alexander is a certified general contractor and former chairman of the Florida Construction Industry Licensing Board. In his expert opinion as a contractor, construction began when the hole was first dug on July 6, 1987 and the pool was placed in it even temporarily. Also in his expert opinion as a contractor, Mr. Alexander determined that the contractor responsible for the installation of this pool was guilty of gross negligence or incompetence due in part to the insufficiency of dewatering devices (including a hydrostatic device) and placement of the responsibility to fill the pool on the home owner. Mark Nasrallah is a registered Florida architect and a licensed general contractor. Also in his expert opinion as a contractor, construction began on the job when the pool was placed in the excavation. It is also Mr. Nasrallah's expert opinion that the contractor responsible for this job is guilty of gross negligence or incompetence. Although Mr. Alexander was unfamiliar with any local Palm Bay zoning or permitting provision which would allow "site clearing" prior to excavation/construction, and although Mr. Nasrallah considered it "questionable" whether the digging for the pool constituted "construction without a permit," Mr. Nasrallah's assessment that digging the hole and putting the pool in the hole even temporarily was in excess of mere site clearing and was work which clearly began construction is accepted. Section 103 of the Standard Building Code has been adopted by the City of Palm Bay. It provides as follows: A person, firm or corporation shall not erect, construct, enlarge, alter, repair, move, improve, remove, convert, or demolish any building or structure in the applicable jurisdiction, or cause the same to be done, without first obtaining a building permit for such building or structure from the Building Official. Respondent was disciplined by the Construction Industry Licensing Board in October, 1984, for violation of Sections 489.129(1)(c), (g), (j); 489.119(2), (3); and 455.227(1)(a) Florida Statutes.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is recommended that the Construction Industry Licensing Board enter a final order finding Respondent guilty of violations of Sections 489.129 (1)(d) and (m) Florida Statutes, issuing a letter of guidance with regard to the permitting violation, fining the Respondent $750.00 for gross negligence or incompetence, and dismissing the remaining two charges. DONE and RECOMMENDED this 23rd day of November, 1988, at Tallahassee, Florida. ELLA JANE P. DAVIS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of November, 1988. APPENDIX TO RECOMMENDED ORDER DOAH Case No. 87-5172 The following constitute rulings pursuant to s. 120.59(2), Florida Statutes, upon the parties' respective Proposed Findings of fact (FOF). Petitioner PFOF: Accepted in FOF 1. Accepted in FOF 2. Accepted in FOF 3. Accepted in FOF 5. Accepted in FOF 7. Accepted in FOF 8. 7-8. Accepted and expanded to more accurately reflect the record in FOF 10 9. Accepted in FOF 11. 10-11. Accepted and expanded to more accurately reflect the record in FOF 12. Accepted and expanded to more accurately reflect the record in FOF 13. Accepted in FOF 14. 14-15. Accepted in part and rejected in part in FOF 15-17. The modifications are made to more accurately reflect the record as a whole, the specific expert opinion as given by Messrs. Alexander and Nasrallah (discussed in the Conclusions of Law) and to reflect that some hydrostatic devices were used, some removed, and at least one left in for a period of time. 16. Accepted in FOF 19. COPIES FURNISHED: Fred Seely, Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32201 G. W. Harrell, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 James J. Hastings 205 Third Avenue Melbourne Beach, Florida 32951 Lawrence A. Gonzalez, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Bruce D. Lamb, General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 =================================================================

Florida Laws (5) 120.57455.227489.105489.119489.129
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs LAWRENCE I. PAUL, III, 92-000193 (1992)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Jan. 13, 1992 Number: 92-000193 Latest Update: Apr. 09, 1993

The Issue Whether the Petitioner violated Section 489.129(1)(a), Florida Statutes, by obtaining licensure by fraud or misrepresentation.

Findings Of Fact The Petitioner is the state agency responsible for licensure of certified general contractors. The Respondent Lawrence I. Paul, III, ("Respondent") is a licensed general contractor, holding State of Florida licenses GC C046485 and CG CA46485. On or about December 12, 1988, the Respondent submitted his application to the Department of Professional Regulation seeking leave to take the examination for certification as a general contractor. The Respondent subsequently took and passed the certified general contractors examination. In his application, the Respondent states that he is qualified to take the examination by virtue of having four years of proven experience as a workman or foreman of which at least one year was as a foreman. On the experience verification form submitted to the DPR as part of his application the Respondent states that from January, 1977 to January, 1980, he had been employed as a construction workman and that from January 1980 to January 1981 he had been employed as a construction foreman. The application includes an experience verification form executed by the Respondent and Paula Wisnik, a New York licensed architect. The form indicates that the Respondent had experience in steel erection form work, masonry walls, concrete slabs, footings, site work, excavation, rebar, trusses, and floor and ceiling joists, in single family residences, strip stores and high rise condominiums ten stories and higher. The experience verification form executed by Ms. Wisnik and the Respondent states as follows: I have read the CANDIDATE INFORMATION BOOKLET and reviewed the experience requirements and understand that any false information provided on this form may subject the person(s) signing below to disciplinary action and possible loss of license. I understand that DIRECT KNOWLEDGE does NOT mean that I am relying on a statement from the applicant that he has met the requirements. Ms. Wisnik has no direct knowledge of the Applicant's experience or of the applicant personally. Her knowledge was based upon information provided to her by Peter Wendt, another licensed architect. The Respondent originally sought to have Mr. Wendt complete the experience verification form. Mr. Wendt forwarded the form to Ms. Wisnik and she subsequently signed the document. Mr. Wendt has no direct personal knowledge of the Respondent's experience as set forth on the experience verification form. Mr. Wendt did not meet the Respondent until the Respondent's move to Florida, which occurred subsequent to the period of employment identified in the application. The greater weight of the evidence establishes that at the time the application was completed, the Respondent did not have the claimed four years of proven experience as construction worker or foreman. The Respondent's application states that first he became employed in the construction trade in January, 1977. In fact, he became employed full time in late December, 1978, with Paul Brothers, Inc., a family owned fire restoration business in Philadelphia. He worked primarily as a salesman and estimator with Paul Brothers until June, 1982, a period of approximately three and one-half years. Although there were periods when the Respondent worked on- site, it was not his primary responsibility throughout the employment period.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Professional Regulation, Construction Industry Licensing Board, enter a Final Order revoking the licensure of Lawrence I. Paul, III, as a certified general contractor, license numbers GC C046485 and CG CA46485. DONE and RECOMMENDED this 19th day of October, 1992, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of October, 1992. APPENDIX TO CASE NO. 92-0193 The following constitute rulings on proposed findings of facts submitted by the parties. Petitioner The Petitioner's proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 1. The proposed finding is modified to reflect that the Respondent did not hold the licenses prior to examination. Respondent The Respondent's proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 5. Rejected, illogical and unsupported by evidence. 6-7. Rejected, not supported by credible and persuasive evidence. COPIES FURNISHED: Daniel O'Brien, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, FL 32202 Jack McRay, General Counsel Department of Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 Robert G. Harris, Esq. Senior Attorney Dept. of Professional Regulation 2295 Victoria Avenue #263 Fort Myers, Florida 33901 Timothy J. Murty, Esq. 1633 Periwinkle Way, Suite A Sanibel, Florida 33957 Wellington H. Meffert, II Chief Construction Attorney Department of Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0750

Florida Laws (2) 120.57489.129
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JAMES W. GEARY, D/B/A FIRST TRIANGLE CORPORATION, 77-000613 (1977)
Division of Administrative Hearings, Florida Number: 77-000613 Latest Update: Sep. 08, 1977

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: Respondent James W. Geary presently holds certified general contractor's license number CG C005775. Respondent Geary apparently entered into a contract with Phillip Smith to add a screened porch to the Smith residence. Neither the contract nor the testimony of Mr. Smith were made available to the undersigned Hearing Officer. Respondent had difficulty obtaining a roofer and completion of the project was therefore delayed. During the interim, the interior of the Smith's living room suffered water damage. After receiving a complaint from the Smiths, Mr. Robert Jahn, Chief Building Official for the City of Tamarac, personally inspected the Smith project. He found that the water damage was caused by the uncompleted work of respondent and certain violations of the Southern Florida Building Code. Jahn did not know how long the project had not been worked on, but Smith told him he had tried for about one month to get respondent to return to correct the situation. Respondent testified that when he sent a man to the Smith residence to install the roof columns, Smith chased the man off the job. Upon the delivery of certain supplies for his projects, respondent Geary, d/b/a First Triangle Corporation, wrote two checks in the total amount of $391.41 payable to Rinker Materials. (Exhibit 1) These checks were offered for payment by Rinker, and were returned due to insufficient funds. The former credit manager of Rinker Materials did not know whether anyone from Rinker had contacted respondent about the checks. Respondent testified that no one from Rinker had informed him that the checks were dishonored. However, respondent did receive notice from his bank that the checks had been returned. He was changing banks about the same time and felt that the bank had made mistakes in the past. He felt that the checks were good when issued and he therefore did not put much reliance upon the notices received from the bank. Respondent testified that he is ready, willing and able to honor the checks written to Rinker Materials. Respondent Geary apparently entered into a contract with Richard Decker for the addition of a five by eleven foot bathroom to the Decker's residence. Neither the contract, the plans or specifications nor the testimony of Mr. Decker were offered into evidence at the Hearing. Respondent felt there were no deviations between the finished product and the job specifications, and that, even if there had been, there was no way he could put a five foot vanity into the project without violating the applicable building code. The field investigator for petitioner's District No. 10 found deviations from the plans with regard to the size of the vanity, the bathroom door and the illumination. He found that the Deckers had not indicated their approval of such deviations by placing their initials on the plans or specification. The South Florida Building Code (302.2(b)) provides that when the cost of a job is over $5,000.00, the permit applicant must present plans signed and sealed by a registered architect or engineer. A larger permit fee is also required for jobs costing over $5,000.00. On or about April 9, 1976, respondent Geary applied to the City of Tamarac for two building permits. (Exhibit 2). While blueprints were submitted, no plans signed and sealed by a registered architect Or engineer were submitted. From the square footages contained on the right hand column of the application, Chief Building Official Jahn determined that the value of the two projects were $7,300.00 and $6,620.00. The contract prices for these projects were approximately $8,000.00 and $10,000.00. There was no conclusive testimony as to who supplied the footage information on these applications, It was respondent's opinion that the actual costs of these projects did not exceed $5,000.00. Respondent apparently entered into a contract with Daniel Salzman for some project, and then entered into a second contract for the construction and installation of a fence and a trellis. For this second project, respondent received a deposit of $825.00. The first job was never completed by respondent and respondent never began work on the fence and trellis project. Respondent admitted that some $500.00 was due Mr. Salzman as a refund for the second project. He testified that he instructed Mr. Salzman to have the work on the first project completed by someone else and then to send respondent the bill for the same. Respondent has not heard from Salzman regarding this matter. By letter dated November 20, 1976, Chief Building Official Jahn notified respondent that "No further building permits [would] be issued to First Triangle Builders with you as their qualifier because of numerous complaints and unfinished projects." As indicated in the Introduction, petitioner filed an administrative complaint against respondent seeking to revoke his license for violations of certain ordinances and Florida Statutes S468.112(2). The cause was referred to the Division of Administrative Hearings for the appointment of a Hearing Officer, and the undersigned was designated to conduct the hearing.

Recommendation Based upon the findings of fact and conclusions of law recited above, as well as the seriousness of the offenses of which respondent has been found guilty, It Is recommended that respondent's certified general contractor's license number CG C005775 be revoked. Respectfully submitted and entered this 18th day of July, 1977, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings Room 530 Carlton Building Tallahassee, Florida 32304 (488-9675) Area Code 904 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Mr. James W. Geary 4370 Northwest 32nd Court Lauderdale Lakes, Florida Wallace Norman Construction Industry Licensing Board 305 South Andrews Avenue Ft. Lauderdale, Florida 33301 J. K. Linnan, Executive Director Construction Industry Licensing Board Post Office Box 8621 JacksonvIlle, Florida 32211

# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DOMINIC D`ALEXANDER, 82-002858 (1982)
Division of Administrative Hearings, Florida Number: 82-002858 Latest Update: Apr. 24, 1984

Findings Of Fact At all times pertinent to the issues in this hearing, Respondent was a licensed building contractor, whose license is No. CBC014467. His certification as an individual by the Florida Construction Industry Licensing Board was initially dated August 16, 1979. In February, 1981, he requested his second license be registered qualifying Jeff Webb Homes, Inc.; and in September, 1982, the license was changed from Jeff Webb Homes, Inc., to Intervest Construction, Inc. On April 23, 1981, Anna Ray McClellan contracted with Regency Central, Inc., for the construction and purchase of a single family residence located at Lot 5, Devonwood Subdivision, Volusia County, Florida. David L. Martin is president of Regency Central, Inc., and neither he nor Regency Central, Inc., are or have ever been registered or certified by the Florida Construction Industry Licensing Board to engage in the business of contracting in the State of Florida. On June 5, 1981, Respondent applied for a residential construction permit for Lot 5, Devonwood Subdivision, listing Regency Central, Inc., as the owner of the property, and himself, with License No. CBC014467, as the contractor. Actual contracting for the construction at Lot 5, Devonwood Subdivision, was accomplished by Regency Central, Inc. Three separate addenda to the construction/purchase contract calling for modifications to the specifications of construction were signed, not by Respondent, but by David L. Martin for Regency Central, Inc. Major subcontracts on the construction including plumbing, electrical, and heating and air conditioning, were entered into between the subcontractors and Regency Central, Inc., and not Respondent. Subcontractors looked to Regency Central for payment, and not to Respondent. A claim of lien filed on ,September 9, 1981, for central air conditioning and heating work on the property in question reflects the work was done under contract with Regency Central, Inc., David L. Martin, President. During construction of the house, Ms. McClellan visited the construction site several times a week at different hours of the day. She recalls seeing Respondent in the area only twice, the first time being the day the contract for purchase was signed, and the second being the day the slab was poured. Her dealings at the site were with the supervisor, Dan Haley, who indicated to her that he worked for Regency Central, Inc. Respondent was interviewed by Philip T. Hundemann, an investigator for the Florida Department of Professional Regulation, in late March, 1982, at Respondent's home. During the course of the interview, Respondent admitted that he met David L. Martin when Martin rented office space in a building that Respondent had constructed and owned. During the course of conversations, Martin suggested to Respondent that he, Martin, had ninety-nine lots available for building and that if Respondent would pull the construction permit for the Lot 5 project, he would get a contract from Martin to build on the other ninety- nine lots. Respondent admitted that he did not supervise the contract, that he did pull the permit, and that he was in violation of the law and had prostituted his license. His defense was, at that time, that he was hungry to get a big construction contract with Martin. Though after he pulled the permits his agreement was to work on the site for the rate of ten dollars per day with the supervisor, Mr. Haley, he was there only infrequently. Respondent now modifies the admissions made previously to Mr. Hundemann. He now states he was heavily involved with the construction project on a daily basis either in his office or on the construction site, not only as a contractor, but also as sales broker. While he admits what he did was in violation of the law and was foolish, he did not intend to break the law. Respondent's involvement with Ms. McClellan's project was not as contractor as indicated in the permit he pulled. He had very little contact with that project until Martin abandoned the project and left the area.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That Respondent's, Dominic D'Alexander's, license as a certified building contractor be suspended for one year, but that, upon the payment of a $500 administrative fine, the execution of the suspension be deferred for a period of three years, with provision for automatic recission. RECOMMENDED this 21st day of March, 1983, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of March, 1983. COPIES FURNISHED: Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Dominic D'Alexander Post Office Box 4580 South Daytona, Florida 32021 Mr. James Linnan Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32201 Mr. Fred Roche Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (7) 120.57489.101489.111489.117489.119489.129489.131
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. HARRY L. WILSON, 84-002424 (1984)
Division of Administrative Hearings, Florida Number: 84-002424 Latest Update: Mar. 21, 1985

Findings Of Fact Harry L. Wilson is the holder of a registered roofing contractor's license from the Florida Construction Industry Licensing Board. The license, Number RC 0041328, was first issued in March of 1982. The license was issued in the name of Harry L. Wilson Roofing, 1943 Hardy Street, Jacksonville, Florida, with the Respondent as qualifier. The Respondent has been the qualifier of Harry L. Wilson Roofing at all times relevant to this proceeding. On December 6, 1984, the Respondent and Robbie L. Hicks, entered into a written contract (Petitioner'S Exhibit 2). Pursuant to this written contract (hereinafter referred to as the "Contract"), the Respondent agreed to perform the repair work specified in the Contract in a "professional manner" and Ms. Hicks agreed to pay the Respondent $2,395.00. The property to be repaired is rental property owned by Ms. Hicks. The property is located at 1508 Eaverson Street, Jacksonville, Florida. The Respondent commenced work sometime during the early part of 1983. Shortly after commencing work, however, the Respondent and Ms. Hicks began having disagreements as to the work to be performed and the quality of the Respondent's work. These disagreements continued after the Respondent completed the work in November of 1983. Ms. Hicks testified that the work that the Respondent completed was done in an unprofessional manner and that the Respondent had not completed all of the work that he had agreed to perform. In particular, Ms. Hicks testified that the Respondent had failed to paint the interior of the house beige as required by the Contract, had failed to remove saw dust and other debris from the house following completion of the work, had failed to finish cabinets installed in the house, had failed to repair screens and generally had not performed in the manner he had agreed to perform. Ms. Hicks paid the Respondent all but $410.00 of the contract price. The Respondent testified that all off the work called for pursuant to the Contract had been performed. According to the Respondent, he had performed some work not required by the Contract and had not performed other work requested by Ms. Hicks because the work was beyond the scope of the Contract. The Respondent also stated that the work which Ms. Hicks expected would have cost considerably more than the price agreed upon in the Contract. The Respondent did not perform all of the work specified in the Contract in a "professional manner" as required by the Contract. Based upon the testimony of Mr. Claude Bagwell, Deputy Chief, Building and Zoning, Inspection Division of the City of Jacksonville, it is clear that no permit was issued by the City of Jacksonville to perform the work required by the Contract. The only permits issued with regard to Ms. Hicks' rental property was a permit issued in 1961 and the original building permit issued in 1949. Additionally, due to the fact that no Florida registered roofing contractor's license in the name of "Harry L. Wilson Roofing" had been filed with the City of Jacksonville, no permit could be issued to Harry L. Wilson Roofing with regard to the Contract. The Respondent admitted that he had not obtained a permit to perform the work required by the Contract. The Respondent indicated that he had not obtained a permit because he was not aware that one was required in order to perform the work. He did indicate that he had obtained permits to perform other jobs. The Respondent could not, however, have obtained permits for other jobs because no license issued in the name of Harry L. Wilson Roofing had been filed with the City of Jacksonville. The Respondent did take the examination required in order to obtain a registered roofing contractor's license. The Petitioner suggested in its Proposed Findings that the "permit requirement was explained" when the Respondent took the exam. No evidence to support such a finding was presented at the hearing. The Respondent in entering into the Contract clearly used the name "Wilson Recycling". Nowhere on the Contract is the name "Harry L. Wilson Roofing" used. The Respondent ultimately admitted that no Florida license authorizing the use of the name "Wilson Recycling" had been obtained by him. The Respondent, however, when initially asked whether a Florida license in the name of "Wilson Recycling" had been obtained indicated that such a license had been issued. On further examination, however, the Respondent testified that an occupational license in the name of "Wilson Recycling' had been obtained by him and not a Florida license. The work to be performed pursuant to the Contract was beyond the scope off the Respondent's license. As pointed out by Mr. Bagwell the work to be performed pursuant to the Contract would require licensure as a registered residential contractor or more.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That count I of the Administrative Complaint filed against the Respondent be dismissed. It is further RECOMMENDED: That Respondent be found guilty of violating Section 489.129 (1)(g), Florida Statutes (1983), by contracting in a name other than the name as set forth on the Respondent's license. It is further RECOMMENDED: That Respondent be found guilty of violating Section 489.129(1)(j), Florida Statutes (1983), by failing in a material respect to comply with the provisions of Section 489.119(2) and(3), Florida Statutes (1983), in that the Respondent failed to qualify the business name "Wilson Recycling" with the Construction Industry Licensing Board. It is further RECOMMENDED: That Respondent be found guilty of violating Section 489.129(1)(j), Florida Statutes (1983), when he failed in a material respect to comply with the provisions of Section 489.117(2), Florida Statutes (1983), by contracting to perform and actually performing work beyond the scope of his Florida contracting license. It is further RECOMMENDED: That Petitioner suspend Respondent's roofing contractor's license for a period of three (3) months. DONE and ENTERED this17th day of December, 1984, in Tallahassee, Florida. LARRY J. SARTIN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of December, 1984. COPIES FURNISHED: H. Reynolds Sampson, Esquire Staff Attorney Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Harry L. Wilson 1943 Hardee Street Jacksonville, Florida 32209 Mr. Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (4) 120.57489.117489.119489.129
# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. W. BERT JONES, 76-002111 (1976)
Division of Administrative Hearings, Florida Number: 76-002111 Latest Update: Jun. 03, 1977

The Issue Whether the certified general contractor's license of W. Bert Jones should be revoked.

Findings Of Fact By an Administrative Complaint filed October 27, 1976, the Florida Construction Industry Licensing Board sought to revoke the general contractor's license of W. Bert Jones alleging that the Respondent contractor entered into a contract with Mrs. Barbara Loewe to renovate her home and to add a room onto the back of the house; that the Respondent contractor was paid in full the contract price but the job was not completed and there were numerous building code violations. Respondent requested an administrative hearing. Pursuant to written agreements entered into between the Respondent and Mrs. Barbara Loewe of Tampa, Florida, Respondent agreed to renovate Mrs. Loewe's home and to add a room onto the back of the house. Mrs. Loewe, either by paying the Respondent directly or paying material suppliers, paid the full contract price. In June or July of 1975 the Respondent left the job contracted for partially or wholly incompleted as follows: the ceiling of the kitchen and drywall were in complete and the kitchen was not painted; the guest bathroom was not trimmed; two back rooms were incomplete. Inasmuch as the ceiling was left undone, it was not trimmed, the drywall was incomplete, the doorways were left uninstalled, and the paneling was incomplete; the bathroom had no toilet, no sink and no trim on the tub; in the master bedroom the ceiling was left sagging, there was no insulation in ceiling or walls, the door was untrimmed, siding was left partially undone and the windows weren't trimmed; holes were left unrepaired around the pipes in the home. The sum of Five Thousand Dollars ($5,000) was paid by St. Paul Fire and Marine Insurance Company in full settlement of the claims arising under the general contractor's bond. Additional money, approximately Thirty-Five Hundred Dollars ($3,500), was spent by Mrs. Loewe in addition to the Five Thousand Dollars ($5,000.00) received from the bonding company in order to complete the jobs contracted for. Although there were minimum changes In the job as originally contracted for, work is still going on to complete the original work contracted for by the Respondent. The building inspector for the City of Tampa Building Bureau, Tom Burgoyme, inspected the job site on several occasions during the progress on the work contracted for between Mrs. Loewe and the Respondent. He found building code violations and submitted a list of corrections to the Respondent, Mr. Jones, which were not remedied. A number of problems arose during the construction work, some of which was not the fault of the Respondent. Another contractor was involved in the work on the project. Funds in excess of the purchase price were paid to the Respondent and funds in excess of Eighty-Five Hundred Dollars ($8,500) were needed or will be needed to complete the project.

Recommendation Revoke the general contractor's license of Respondent, Number C GC007323. DONE and ORDERED this 7th day of April, 1977, in Tallahassee, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 W. Bert Jones 2300 Greenlawn Street Brandon, Florida 33511