The Issue The issues in this matter are as established through an Administrative Complaint brought by the State of Florida, Department of Professional Regulation, against Johnny C. Fossett alleging various violations of Chapter 489, Florida Statutes, related to a job conducted for Joshua and Jacquelyn Williams. More specifically, Respondent is accused of violation of Section 489.129(1)(j) , Florida Statutes (1981), by failing to properly qualify a company under which he was doing business. In a related vein, he is accused of violation of Section 489.129(1)(g) Florida Statutes (1981), by acting in a name other than that on his license. Respondent is accused of violating Section 489.129(1)(d), Florida Statutes (1981), for willful and deliberate disregard and violation of a local building code. Respondent is accused of violating Section 489.129(1)(j), Florida Statutes, for contracting beyond the scope of his registration. Finally, Respondent is accused of a violation of Section 489.129(2), Florida Statutes,(1981), in violating Rule 21E-15.07, Florida Administrative Code, by failure to notify the Construction Industry Licensing Board of a change of address within 30 days of such change.
Findings Of Fact Respondent, Johnny C. Fossett, is the holder of a license issued by the Florida Construction Industry Licensing Board in the field of registered roofing contractor. That license number is RC 0040728. Respondent is also the qualifying agent of J. C. Fossett Roofing & Maintenance Repair of 4978 Soutel Drive, Jacksonville, Florida. In addition to the Soutel address associated with J. C. Fossett Roofing & Maintenance Repair, Respondent has given the Florida Construction Industry Licensing Board the address 8937 Castle Boulevard, Jacksonville, Florida, as his address. On April 15, 1983, Respondent contracted with Joshua and Jacqelyn Williams of 4634 Fairleigh Avenue, Jacksonville, Florida, for the construction of a utility building with roof; to repour a carport slab; and to construct a screened-in patio with roof. The agreement was also for the removal of a tree hanging over the den and carport area of the existing home. The total price of this contract was $3,550. Eighteen hundred dollars was paid as a deposit, and the remainder of the contract price was paid on May 11, 1983. In the proposal or contract agreement Respondent noted that the work was guaranteed by an entity known as J. C. Roofing. A copy of this proposal may be found as Petitioner'S Exhibit No. 2 admitted into evidence. Neither the Respondent nor any other duly licensed contractor had qualified the entity/organization known as J. C.. Roofing with the Florida Construction Industry Licensing Board. Respondent performed the work called for in the contract, without obtaining the necessary building permit from the City of Jacksonville, Florida. Respondent was registered with the City of Jacksonville as a roofing contractor. He was not registered in the fields of general contracting, building contracting, or residential contracting, which would have been necessary before Respondent could conduct that work for the Williamses, other than roofing. Respondent could not have been registered with the City of Jacksonville in those fields of general contracting, building contracting, and residential contracting because he was not qualified. The Williamses experienced problems with the quality of Respondent's work, most notable, leaks in the roof that Respondent had worked on. When it rained water would run down the walls and promote mildew. This was in the area of the joining of the roof over the patio and the roof over the carport. In response to complaints, Fossett made such remarks as "A little water on the roof is good" and offered to drill holes in the roof and install rain gutters to alleviate the problem. The owners found this unacceptable. Respondent having failed to satisfy their claims, the Williamses sought other assistance in effecting repairs. The roof still leaks. On the occasion of attempting to have these problems corrected, the Williamses sought to contact the Respondent at his Soutel address by calling the number found on the business card provided by the Respondent. When phoning that number it was discovered that someone other than the Respondent was doing business from the Soutel address. The phone number was the Respondent's residential number. The card, as given to the Williamses, indicates that the business is J & C Roofing Company, Johnny C. Fossett, Owner. Again, this business name is one for which the Florida Construction Industry Licensing Board has no indication of a duly licensed contractor properly qualifying that entity, either the Respondent or some other person. Petitioner's Exhibits Nos. 5 through 7, admitted into evidence, are photographs of the work done by the Respondent, to include roofing, and the mildew on the concrete blocks found on the outside of the patio wall which was promoted by the leak in the roof.
Findings Of Fact At all times material to these proceedings, the Respondent LARRY DAVID COMES, was licensed by the State of Florida as a registered specialty contractor and held license number RX00400762. Mr. Comes is the qualifying agent for D & L Enterprises. At all times material to these proceedings, the Respondent CHARLES J. GOREE was licensed by the State of Florida as a certified general contractor and held license number CG C007621. Mr. Goree is the qualifying agent for CJC Incorporated. In the beginning of the year 1985, the Island Village Association decided to reroof all six buildings located in the condominium project. At the time of the decision, all of the roofs were leaking. The existing roofs had been repaired and patched numerous times since the condominiums were built in 1973. On February 27, 1985, the Respondents COMES and GOREE submitted a joint proposal to the association to remove the existing built-up roof, apply a Neoprene/Hypalon roof, and remove and reshingle the mansard roof for $19,865.00. On April 15, 1985, a written contract was entered into between Island Village Condominium Association and David L. Comes, d/b/a D & L Enterprises, as contractor for the reroofing of Building "C." The Contract required the contractor to furnish all materials and labor to remove the existing built-up roof. Rotten wood on the deck was to be replaced on a time and materials basis. Damaged scuppers were to be replaced and other scuppers were to be cleaned out by the contractor. The Neoprene/Hypalon system would then be applied to the flat roof and the parapet walls. The mansard roof was to be removed and reshingled. Although Charles J. Goree, d/b/a CJC Incorporated, was not named in the contract, the omission was an oversight. At all times during the course of the reroofing project, the Respondent GOREE was responsible for the removal of the existing built-up roof and the application of new shingles to the mansard roof. The Respondent COMES was responsible for the application of the Neoprene/Hypalon roofing system. The reroofing project was a joint undertaking in which Respondents GOREE and COMES exercised equal authority, joint control, or right of control. The Respondents had a community of interest in the performance of the contract with the association. Respondents GOREE and COMES were familiar with what was required of each of them under the verbal joint venture agreement as they had conducted business in the same manner over an extended period of time on several projects. On May 10, 1985, Respondent GOREE applied for and received a building permit for the reroofing of Building "C" at Island Condominiums. During the removal of the built-up roof, GOREE observed "an absolute mess and disaster." The roof had been patched in various ways on numerous occasions. GOREE observed a few "T nails" in a piece of metal stripping picked up with shovels on the roof. The "T nails" discovered were the type which are shot into materials from a nail gun. (See GOREE Exhibit #2) They are not used to secure plywood on a deck because of their short length. Another "T nail," such as GOREE's Exhibit 2, was found by GOREE lying on the area of the roof by the air conditioners. This area of the existing roof was not removed or disturbed during the reroofing process. In the application of his common sense and knowledge of good construction practices and in light of the material in which the "T nails' were located, Respondent GOREE was not put on notice that these "T nails" may have been used to fasten the plywood decking. The type of "T nail" which was used upon plywood roof decking a few years ago in Florida was longer, thicker, and shaped like an elongated wedge. (See GOREE Exhibit 4) None of the "T nails" formerly used for plywood decking were observed by GOREE on the roof. Once the built-up roof was removed, Respondent COMES acted within the terms of the joint venture agreement by applying the Neoprene/Hypalon roofing system in full compliance with the specifications as set forth in the contract with Island Village Condominium Association. During the application of the system, COMES and his crew did not observe any conditions on the plywood decking which would alert them to the possibility of any future problems with the system. On May 17, 1985, Mr. Jim Peaks, an Inspector for Brevard County, completed a "dry in" inspection of the roof on Building "C" which had been requested by Respondent GOREE. Mr. Peaks placed a stop order on the project because the Neoprene/Hypalon roofing system was not an approved product under the Southern Building Code which he believed was in effect in Brevard County on May 14, 1985. In actuality, the 1982 Standard Building Code was in effect at the time. Upon receipt of the stop order, Respondents COMES and GOREE went to the building department and met with Murray Schmidt, Mr. Peaks' supervisor. Mr. Schmidt had the authority to override Mr. Peaks' stop order. Mr. Schmidt, who was new to the county and his position, discussed the stop order with the Inspector. Mr. Peaks refused to remove his stop order because of the lack of code compliance. Mr. Schmidt verbally allowed the Respondents GORE and COMES to continue to work on the roof. Mr. Peaks was told to investigate the roofing system with the Southern Building Code Conference in Birmingham, Alabama. The Respondents were not notified again as to the status of the stop order, one way or the other. Because the Respondents had been told to continue the work on the roof by Mr. Schmidt, who had the authority to override stop orders, the Respondents reasonably assumed that a stop order was no longer in effect. In fact, the permit had the notation "See Murray" on it after the stop order notation. Upon completion of the project, Respondent COMES contacted the building department and requested a final inspection. In the usual course of dealing between contractors and the building department in Brevard County, a contractor is notified only if there is a problem with the project which needs correction before final approval. Neither COMES or GOREE received notification of a problem. Another recognized, usual course of dealing between a contractor and the building department is that the department notifies an owner or the contractor if a six month permit has expired and a final inspection has not been completed. GOREE was not notified of any permit expiration in this case. Again, the Respondents were given the impression by the inactivity in the building department that business was being conducted in the usual manner. The Respondents believed, based upon past and ongoing dealings with the department, that all of their obligations had been met on the reroofing project. On May 28, 1985, the final payment was received from Island Village Condominium Association and a limited warranty was issued in both Respondents' company names, pursuant to the contract with the association. Shortly after completing the job on Building "C," Respondent COMES was called to repair leaks in the new roof. COMES responded promptly and courteously, and placed the blame for the leakage on various factors such as: (1) The short "T" fasteners had begun popping through the Neoprene/Hypalon and destroyed its ability to prevent water penetration. (2) The roof had an inadequate drain system. (3) The plywood deck was bowed in a concave fashion due to the years of improper weight and excess water on the roof. During a meeting with the board of directors of the association requested by COMES, COMES offered to put on a new roof if the board would install sump pumps to remove standing water. The board rejected COMES offer and authorized the condominium property manager to seek other solutions. The Respondents were not contacted by the board again concerning alternative solutions to the problem. In June of 1986, Mr. Rex Lahr, the condominium property manager, began a review of the roof situation. After consulting with Mr. Tom Butler of the county building department, Mr. Lahr decided that an architect needed to be retained by the association to determine whether a structural deficiency or the new roofing system caused the leaks in the roof. An architect was not hired by the association. A traditional, built- up roof was applied over the Neoprene/Hypalon roofing system. In the application of the new roof, the drainage system was redone and the flat roof was given pitch, thereby redesigning the roof as well. Mr. Robert B. Hilson, who was tendered as an expert witness in the case, opined that the Respondents COMES and GOREE failed to properly determine whether the roof deck was in a condition to accept the Neoprene/Hypalon system. Mr. Robert H. Adams, who was tendered as an expert witness in the case, opined that the leaks which developed soon after the application of the Neoprene/Hypalon system indicated that the deck was not in a condition to accept the system. Although there is some basis in fact for the opinions rendered by the two experts, their opinions must be rejected for the following reasons: (1) The experts did not personally observe the building, nor was a determination made which would exclude the possibility that the roofing system failed as a result of structural or design defects. (2) There is ample evidence in the case to support a finding that the leaks were caused by structural or design defects, as well as latent defects not readily observable to the Respondents at the time the roofing system was applied, and outside the terms of the reroofing contract. Some examples of evidence which support a finding that the leaks were caused by structural or design defects are: (1) Mrs. Delores Hammels' testimony that all six buildings had to be reroofed as they all leaked periodically throughout their 12 years of existence; (2) the redesign of the drainage system and the placement of a pitch on the roof by Mr. Roush; (3) the testimony and sketch submitted by Respondent GOREE (GOREE Exhibit #5) which shows that an identical building with a pitch on the roof allows the drainage system, including the internal hidden piping system, to work correctly. The effective redesign of the roof by Mr. Roush confirms this theory as much as, or more than, Mr. Robert H. Adams' theory that the deck was not in a condition to accept the Neoprene/Hypalon system.
The Issue The issues in this case are whether Respondent engaged in the unlicensed practice of contracting, and, if so, what penalty should be imposed.
Findings Of Fact The Department is the state agency responsible for, inter alia, licensing and monitoring general contractors. Department headquarters are in Tallahassee, Florida. Part and parcel of the Department's duties is the sanctioning of persons who practice general contracting without a license. Respondent is an individual living in Tampa, Florida. Respondent did not appear at final hearing and has not filed any post-hearing motions concerning his failure to appear. The Administrative Complaint filed by the Department makes the following allegations: Respondent was not registered or certified to engage in the practice of contracting. Respondent, doing business as J.D.S. Roofing, contracted with Vivian Virgil to perform certain roofing work, specifically, to remove and replace shingles and related work to reconstruct the roof on Virgil's home. A contract between the parties dated April 21, 2006, was signed by Virgil and Respondent (or his authorized representative). Virgil made two payments to Respondent in the amounts of $2,500.00 (via check number 1037) and $1,564.46 (via check number 1040). She also made a payment of $2,860.54 to The Home Depot to pay for materials ordered by Respondent for Virgil's roofing repairs. Respondent then made the contracted-for repairs and replacement of Virgil's roof pursuant to the contract.2 Virgil, however, was not pleased with the quality of the work. She is unable to get a warranty on the roof because Respondent's work was inferior. Virgil must have another contractor re-do the roof in order to get a warranty. Neither Respondent nor his company, J.D.S. Roofing, is or has ever been licensed by the State of Florida as a contractor. However, Respondent held himself out as a general contractor in his dealings with Virgil.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered by the Department of Business and Professional Regulation finding that Respondent, James Delaughter, is guilty of the unlicensed practice of contracting and imposing a fine of $5,000.00. DONE AND ENTERED this 8th day of April, 2008, in Tallahassee, Leon County, Florida. R. BRUCE MCKIBBEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of April, 2008.
The Issue Whether disciplinary action should be taken against Respondent based on violations of Sections 489.127(1)(f) and 455.227(1)(q), Florida Statutes, as charged in the Administrative Complaint.
Findings Of Fact Petitioner Department of Business and Professional Regulation is the State Agency charged with regulating the practice of contracting, pursuant to Section 20.165, Florida Statutes, and Chapters 455 and 489, Florida Statutes. Petitioner has jurisdiction over the unlicensed practice of contracting, pursuant to Section 455.228, Florida Statutes. At all times material, Respondent, Jerome Smith, was not licensed, nor had he ever been licensed by the State of Florida to engage in contracting. At all times material, Construction Management, Inc., was not qualified to engage in the practice of contracting, pursuant to Chapter 489, Florida Statutes. Respondent and Kulin Buch worked together in the same tool and die company. They had known each other for some time before the incidents herein. In 2006, Mr. Buch was looking for a roofer to fix a leak in the roof over his master bathroom. Respondent's name was provided to Mr. Buch as a former roofer or part-time roofer by a common supervisor, Dennis Wilson. Respondent considered Mr. Buch also to be one of his supervisors, a status Mr. Buch denied. However, Respondent and Mr. Buch considered themselves to be friends, and Respondent visited in Mr. Buch’s home two times prior to their ultimately agreeing to a contract. On or about February 18, 2006, Respondent agreed with Mr. Buch to perform roofing repairs on Mr. Buch’s single family dwelling for $3,200.00. Respondent created a written contract to this effect. According to the contract, which may have been back- dated after the job was completed, Respondent was to remove the shingles, replace any bad wood, reinstall felt paper, fix the damaged area, and install new shingles on the entire roof. The contract bore the heading, “Creative Construction Management, Inc.,” and stated, “The work performed is being done by friends of Kulin [Buch], we are in the process of obtaining a roofing license.” (Bracketed material supplied for clarity.) Respondent brought one person with him to do Mr. Buch’s roof work on a three-day weekend. Respondent claimed that a neighbor of Mr. Buch also helped with the roof repairs. Respondent was, in fact, paid $3,200.00 by Mr. Buch by two checks in the amount of $2,000.00 on February 18, 2006, and $1,180.00 on February 25, 2006, and was paid $20.00 in cash. The $20.00 was for a meal consumed in the course of the work. Respondent admitted that, although most of the money went for shingles, other materials, and equipment which he did not have because he no longer was employed full-time as a roofer, he made a profit of approximately $800.00, on Mr. Buch’s roof repair. There is no evidence that any other persons working with Respondent were paid anything by Respondent or by Mr. Buch. At Mr. Buch’s request, Respondent had business cards printed up and gave one to Mr. Buch. The cards were headed, “Creative Construction,” and displayed Respondent’s telephone number. Respondent placed license numbers 0008155 and 99062921 on these business cards. These were his local occupational license numbers which Respondent knew were no longer in effect. He also knew that he no longer carried the requisite amount of insurance to maintain the occupational licenses. Respondent did not fix the leak above Mr. Buch’s master bathroom properly, and the master bathroom was extensively damaged by storms that followed. Despite Respondent’s work, Mr. Buch had to pay approximately $1,000.00 to a licensed contractor to fix the leak in his roof. Petitioner’s costs in connection with investigation of Mr. Buch’s complaint amount to $80.79. Petitioner’s investigator testified that Respondent had previously engaged in unlicensed roofing contracting in Ormond Beach in the month of June 2005. In relation to that situation, Petitioner issued Respondent a Notice and Order to Cease and Desist any unlicensed roofing activity in DBPR Case No. 2005-027065. The Notice was sent at that time both by certified and regular U.S. Mail to Respondent's last known address. The return receipt for certified mail was signed-for by a person at Respondent's residence, and the Notice which had been sent by regular mail was never returned to Petitioner. Despite Respondent’s eliciting testimony from Petitioner's investigator that the signature on the return receipt did not look like another single exemplar of Respondent’s signature, and Respondent’s denial of ever getting the certified mail copy, Respondent did not specifically deny engaging previously in unlicensed contracting or specifically deny that he had gotten the regular mailing of the Cease and Desist Order.
Recommendation Based on the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED that a final order be entered finding Respondent guilty of Count I (Section 489.127(1)(f), Florida Statutes), assessing a fine in the amount of $5,000.00 and investigative costs in the amount of $80.79, and not guilty of Count II (Section 455.227(1)(q), Florida Statutes). DONE AND ENTERED this 13th day of February, 2008, in Tallahassee, Leon County, Florida. S ELLA JANE P. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of February, 2008. COPIES FURNISHED: Sorin Ardelean, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202 Jerome Smith 2775 Big John Drive Deland, Florida 32724 Nancy S. Terrel Hearing Officer Office of the General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792 Ned Luczynski, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792
Findings Of Fact At all times pertinent to the issues herein, Graciela Zara was a registered roofing contractor in the State of Florida having license number RC 0035417. Respondent qualified Rolando Lopez Roofing Corp. at all times material to the complaint. Roofing work was done on the building located at 8413 8415 Hardin Avenue; however, the roofing work was not done by Rolando Lopez Roofing, but rather by Chungo, an employee of M. G. Construction Company, the owner of the building. Certain materials for the roofing work were delivered to 8413-8415 Harding Avenue by Tops All Roofing & Building Products, Inc., and those materials were ordered by Rolando Lopez and/or Renee Garcia. Rolando Lopez Roofing performed roofing work at the the bank at Las Americas Shopping Plaza, 8500 N.W. 85th Street; however, there was no evidence presented that Rolando Lopez Roofing failed to obtain a permit for the work it performed. Tropical Roofing entered into a contract for roofing work at the home of Mr. Sosa, 3001 S.W. 96th Avenue, Miami, Florida. 2/ The work was subcontracted to and done by Rolando Lopez Roofing. Although a permit for the work was required, respondent failed to obtain a permit. The respondent was responsible for obtaining the permit because the contractor that performs the work is responsible for obtaining the permit. Leon Gomez entered into a contract with Rene Garcia for roofing work at 309 Pinecrest Drive. Rene Garcia performed the roofing work on the house and was paid for the work by Mr. Gomez. However, the permit for the roofing work was obtained by the respondent. Roofing work was performed at the home of Felipe Acosta, 401 Flagami Boulevard, Miami, Florida. The permit for the roofing work was obtained by respondent. The contract for the work was with Rolando Lopez Roofing. The roofing work was performed by Rene Garcia and other workers that Mr. Acosta did not know. Mr. Acosta does not know Rulando Lopez. The contract negotiations and the payment for the job were handled by Mr. Acosta's brother. Mr. Acosta did not know whether Rene Garcia or Rolando Lopez received payment for she roofing work, but he knows his brother paid one of them. The roofing work was performed pursuant to the contract with Rolando Lopez Roofing. On June 1, 1983, Rolando Lopez Roofing Corp. issued a check for $11,667.86 to Tops All Roofing & Building Products. The check was returned by the bank stamped "Account Closed." On September 16, 1983, Rolando Lopez was adjudicated guilty of issuing a worthless check in violation of Section 832.05. Mr. Lopez paid $5,000 in restitution to Tops All Roofing & Building Products, but he was unable to pay the remaining amount because he has been unable to get any work. There was no evidence that Rolando Lopez Roofing Corp. failed to pay creditors for materials furnished. Although Rolando Lopez failed to make full restitution to Tops All Roofing and Building Products for the $11,667.86 check that was returned, there was no evidence that the check was for building supplies furnished to Rolando Lopez Roofing. Rolando Lopez testified that the check was written for the benefit of his nephew, Rene Garcia, to be used as collateral. Further, there was no evidence that Tops All Roofing & Building Products had furnished any building materials to Rolando Lopez Roofing prior to June 1, 1983, the date of the check. There was no evidence presented that Rene Garcia was not licensed by the State of Florida as a registered or certified roofing contractor
Recommendation Based on the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED that the Respondent be placed on probation for a period of six months. DONE and ORDERED this 2nd day of January, 1985, in Tallahassee, Leon County, Florida. DIANE GRUBBS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of January, 1985.
Findings Of Fact Respondent is Richard McDougal, holder, at all times pertinent to these proceedings, of registered roofing contractor license no. RC 0050466. Petitioner is the Department of Professional Regulation, Construction Industry Licensing Board, the state agency charged with the regulation of contractors in the State of Florida. Respondent was the qualifying agent for D & R Roofing Co., at all times pertinent to these proceedings. On July 31, 1989, Arla Jackson signed and accepted Respondent's written proposal to re-roof a house belonging to Jackson, located in Washington County, Florida. Prior to engaging Respondent to re-roof the house, Jackson had only a minimal amount of leakage in a couple of corners inside the house. Under the terms of the written proposal provided by Respondent to Jackson, Respondent agreed to remove the old roof covering from the structure; install a new three ply fiberglass felt covering; install new eave metal around the roof perimeter; extend the roof a short distance at one end; and top coat a utility building on the premises. Further, Respondent agreed to haul away debris resulting from the job. Completion of the roofing project by Respondent and receipt of payment from Jackson in the amount of $3,000 occurred on August 9, 1989. $2,900 of this amount was payment to Respondent for replacing the old roof while the remainder satisfied charges by Respondent for additional work required to extend the roof. Shortly after Respondent's completion of the roof replacement, Jackson began to telephone Respondent, requesting that he come and repair holes in the roof that were leaking water as the result of rain. Respondent came to Jackson's house on at least three occasions to attempt to stop leaks in the roof. He eventually determined that he had stopped the leaks and told Jackson that, as far as he was concerned, there was no roof leakage problem. Jackson's flat roof continued to leak. Eventually, Gus Lee, an unlicensed roofing assistant to H.M. Strickland, a local licensed contractor, agreed to repair her roof and eliminate the leakage problem. Strickland's signature appears with Lee's on written documentation bearing the date of October 1, 1989, and promising a "fine roof with no leaks; and I will stand behind it." Jackson accepted the Strickland offer. Jackson paid approximately $1,925.00 to Lee for work in connection with replacing the roof and painting the interior ceiling of the house. She paid an additional $653.79 for building supplies in connection with the project. Overall, Jackson paid approximately $2,578.79 for labor and materials to re-roof her house and repair the interior ceiling damage resulting from the leakage. This amount was in addition to the amount previously paid to Respondent. On October 20, 1989, Lee, the unlicensed assistant to Strickland and the person who actually undertook the task of re-roofing Jackson's house, removed the previous roofing material placed on Jackson's house by Respondent. Lee observed no fiber glass felt covering material on Jackson's roof at the time he re-roofed the house. Lee's testimony at hearing was credible, candid and direct. Although unlicensed as a contractor, Lee's attested experience supports his testimony regarding what he observed and establishes that Respondent failed to comply with his agreement to Jackson to provide fiber glass felt during the initial roofing of the house and instead used a less expensive material. Lee's testimony, coupled with that of Jackson and Lee's son, also establishs that significant damage had occurred to the interior ceiling of Jackson's house as the result of leakage after completion of work by Respondent. After Lee completed the re-roofing of Jackson's home, inclusive of use of a six ply felt covering on the roof accompanied by pea gravel and sealant, the roof's leakage stopped.
Recommendation Based on the foregoing, it is hereby RECOMMENDED that a Final Order be entered imposing an administrative fine of $1500 upon Respondent's license as a registered roofing contractor. DONE AND ENTERED this 25th day of November, 1991, in Tallahassee, Leon County, Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Fl 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of November, 1991. APPENDIX TO RECOMMENDED ORDER The following constitutes my specific rulings, in accordance with Section 120.59, Florida Statutes, on findings of fact submitted by the parties. Petitioner's Proposed Findings. 1.-4. Adopted, though not verbatim. 5.-8. Subordinate to Hearing Officer's Conclusions. 9.-11. Adopted in substance, though not verbatim. Respondent's Proposed Findings. None submitted. COPIES FURNISHED: Robert B. Jurand, Esq. Department of Professional Regulation The Northwood Centre, Suite 60 1940 N. Monroe St. Tallahassee, FL 32399-0792 Richard McDougal Box 10277 Panama City, FL 32404 Daniel O'Brien, Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, FL 32201 General Counsel Department of Professional Regulation The Northwood Centre, Suite 60 1940 N. Monroe St. Tallahassee, FL 32399-0750
The Issue Whether Respondent committed the offenses alleged in the Administrative Complaint and, if so, the penalties that should be imposed.
Findings Of Fact At all times relevant to this proceeding, Respondent has been licensed by the Petitioner as a roofing contractor, having been issued license number CCC 57995 by the Florida Construction Industry Licensing Board. At all times relevant to this proceeding, Respondent was the qualifier for and did business as “Victor’s Roofing Co., Inc. of the Fla. Keys” (Victor’s Roofing). At all times relevant to this proceeding, Mr. Johnson was an owner of property located at 3214 Harriet Avenue, Key West, Florida (the subject property). Mr. Johnson lives in Hollywood, Florida. The subject property is rental property. Respondent and his company are not licensed to do drywall work in Key West, Florida, and they are not licensed with Petitioner other than as a roofing contractor. ROOFING WORK On November 3, 2008, Respondent, on behalf of Victor’s Roofing, entered into a contract with Mr. Johnson to re-roof the subject property. The proposal submitted by Respondent to Mr. Johnson contained Victor’s Roofing’s full corporate name; its office address in Marathon, Florida; two telephone numbers; and a fax number. The proposal was signed by Respondent. The proposal described in some detail the scope of the work. The price of the work was $7,000.00. Mr. Johnson accepted the proposal. Victor’s Roofing completed the roofing job to Mr. Johnson’s satisfaction. A leak developed after the roof was completed and Victor’s Roofing promptly repaired the leak to Mr. Johnson’s satisfaction. Petitioner’s Administrative Complaint alleged that Victor’s Roofing had failed to obtain a permit for the roofing job on the subject property and that it had failed to obtain required inspections. Those allegations were the result of an error by Petitioner’s investigator. Ms. Del Rio obtained records from the City of Key West Building Department for the wrong address. Instead of obtaining the permit history for the subject property (3214 Harriet Avenue) she requested and obtained the permit history for 3314 Harriet Avenue. Respondent applied for a permit for the roofing job on the subject property on November 11, 2006, and he obtained an inspection of the roof on November 27, 2007 [sic]. There was insufficient evidence to establish that any other permit or any other inspection was required for the roofing work. DRYWALL WORK After the roofing job had been completed (but before the inspection on November 27, 2007),2 Mr. Johnson informed Respondent by telephone that he needed someone to replace drywall that had been damaged during the period of time the subject property’s roof leaked. Mr. Johnson asked Respondent whether he knew anyone who could do the job. Respondent replied in the affirmative and told Mr. Johnson he would have someone contact him about doing the work.3 Thereafter, Respondent’s brother, Early Harris, contacted Mr. Johnson and the two of them verbally agreed on a price of $4,000. At the time Respondent put Early Harris in touch with Mr. Johnson, Respondent knew that Early Harris was not licensed to do drywall work in Key West. After giving Mr. Johnson’s telephone number to Early Harris, Respondent had no further involvement with the drywall work on the subject property. The price of the drywall work escalated to $9,000.00 after the work began. On November 25, 2006, Early Harris and Mr. Johnson signed a written proposal agreeing to the price of $9,000.00.4 This was a form proposal with the following: Victor’s Roofing Co., Inc. 2nd Generation Serving South Florida Licensed & Insured Marathon, Fla. The only telephone number on the proposal other than Mr. Johnson’s, was the number for Early Harris’ cell phone. The contract signed by Respondent on November 3, 2006, for the roofing work was on a different form and utilized a different font than the contract signed by Early Harris on November 25, 2006. The name of the corporation on the proposal for the drywall work, while similar to the name of Respondent’s company, was different. Early Harris has worked for Respondent’s business for several years, but there was no clear and convincing evidence that Early Harris had the authority to contract on behalf of Respondent’s business in November 2006. There was no evidence that Early Harris is a part owner of Respondent’s business or that he is an officer or director of Respondent’s business. Respondent testified, credibly, that Early Harris was not authorized to contract on behalf of Respondent’s business at the times relevant to this proceeding. There was no clear and convincing evidence to refute Respondent’s assertion that Earl Harris had no authority to contract on behalf of Respondent’s business. Early Harris did the drywall work on the subject property. Mr. Johnson paid Early Harris $9,000.00 for the drywall work. Mr. Johnson could not find the check(s) he wrote for the drywall work and, consequently the check(s) were unavailable as an exhibit. His recollection as to the name of the payee of the check(s) was not clear. Respondent testified, credibly, that neither he nor his business received any of the money for the drywall work. The drywall work Early Harris did was not to Mr. Johnson’s satisfaction. Mr. Johnson had to pay $600.00 to a drywall contractor for corrective work. In addition, Mr. Johnson had to pay $600.00 for a permit to have the repair work done.5 The total investigative costs of this case to Petitioner, excluding costs associated with any attorney’s time, was $191.16.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department of Business and Professional Regulation, Construction Industry Licensing Board, enter a final order finding Respondent not guilty of the violations alleged in Counts I, II, and III of the Administrative Complaint. DONE AND ENTERED this 14th day of January, 2010, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of January, 2010.
Findings Of Fact The Respondent's name is Troy Griffin. The Respondent is now and was at all times relevant to the pending Administrative Complaint, a registered residential contractor in the State of Florida having been issued license number RR 0030688. The Respondent is not now and at no time material to the pending Administrative Complaint was the Respondent a certified or registered roofing contractor in the State of Florida. At all times material to the pending Administrative Complaint, the Respondent's license #RR 0030688 qualified Griffin Remodeling & Repairs, Jacksonville, Florida. In June 1978 the Respondent d/b/a Griffin Remodeling and Repairs contracted to repair the residence of June Moody, Jacksonville, Florida. The contracting work included work upon the Moody's built-up roof, which Respondent re-roofed pursuant to contract. Respondent built up the roof with more than one layer of felt in 1978. These layers were discovered by the city's inspector in 1982. Respondent returned in 1978 and patched the roof he installed. These patches were seen by the city's inspector in 1982. The owner, Moody, did not complain of leaks in 1982. There was no evidence of leaks in 1982. A roof poorly installed without sufficient tar and felt will leak within the time that has passed between 1978 and 1982. See inspector's testimony in response to Hearing Officer's question. Moody's home was a single family, one story residence. No evidence was received regarding whether the City of Jacksonville requires examinations of roofing contractors prior to their certification.
Recommendation Having found that the Respondent did not commit the alleged violations, it is recommended that the Administrative Complaint be dismissed and no action be taken. DONE and ORDERED this 23rd day of August, 1985, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings The Oakland Buildina 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of August, 1985. COPIES FURNISHED: W. Douglas Beason, Esq. Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Troy Griffin 7443 Laura Street Jacksonville, Florida 32202 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 James Linnan, Executive Direetor Department of Professional -I Regulation. Construction Industry Licensing Board P. O. Box 2 Jacksonville, Florida 32202
Findings Of Fact At all times relevant, Willie James Collier was licensed as a registered roof contractor in the State of Florida, having been issued license number RC0040382. At all times relevant, Willie James Collier qualified the roofing business he owns and manages, A-1 Collier Roofing, at 2230 Blossom Terrace, Orlando, Florida 32809. On May 5, 1982, Willie Collier contracted with Robert P. Guarante to reroof Mr. Guarante's residence at 2525 Venetian Way, Winter Park, Florida. The terms of the written contract included a five-year guarantee on the work. The work was completed on May 6, 1982, and Guarante paid the negotiated amount of $4800.00. A few weeks after the installation, there was some problem with the flashing around the chimney. Guarante had no difficulty contacting Collier and the necessary repairs were made. Sometime around November 1985, Guarante detected discoloration, like rust stains, under the eaves. He first had the gutter replaced, but afterward figured the problem was seepage from the roof. He attempted to call Willie Collier. There were no answers until he called one night and was told that Willie Collier was not at that number. Mr. Guarante then drove to the street address he had for the roofing company. It was a residential area and he did not get out of the car and knock on doors. He sent a letter by regular mail to 2230 Blossom Terrace, Orlando, asking that Willie Collier call him immediately. The letter was not returned, nor was it answered. He contacted the Better Business Bureau, but this did not result in a contact with Mr. Collier. Another roofer, Robin Hood, told Mr. Guarante that there was a depression collecting water on the outer extremity of the roof, due to improper installation. Robin Hood built up the depression and charged Guarante $70.00. There were no more problems, and six months later the house was sold. Mr. Collier denies receiving any letters from Mr. Guarante or the Better Business Bureau. He was in financial difficulty in 1985, and the phone was disconnected three times. At one point the phone was in his wife's name. His licensing record reveals that his license was under suspension during 1985. He did not maintain an advertisement in the Yellow Pages during 1985. His address has not changed. It remains the same as it was from the first license application in 1976: 2230 Blossom Terrace, Orlando, Florida 32809.