PINELLAS COUNTY CONSTRUCTION LICENSING BOARD vs MICHAEL G. LINTON, 95-005933 (1995)
Division of Administrative Hearings, Florida Filed:Largo, Florida Dec. 06, 1995 Number: 95-005933 Latest Update: May 20, 1996

The Issue The issue for consideration at this hearing is whether Respondent's certification as a communications systems specialty contractor in Pinellas County should be disciplined because of the matters alleged in the Administrative Complaint filed herein.

Findings Of Fact At all times pertinent to the issues herein, the Petitioner, Pinellas County Construction Licensing Board, was the county agency responsible for licensing contractors in the construction trades in Pinellas County and for the regulation of the profession of contracting in that county. Respondent, Michael G. Linton held license No. C-5513 as a certified communications systems specialty contractor in Pinellas County. On or about June 14, 1995, Kim and Vincent Carter, tenants at a residence located at 118 7th Street in Belleair Beach, Florida, contacted Respondent to secure his assistance in moving the satellite reception dish which he had initially installed for them to their new residence. On that date, Respondent issued an invoice to the Carters on which he indicated he was to reinstall their satellite system for $300.00. The statement was signed by Respondent and also bears the apparent signature of V.J. Carter. Mr. Linton claims it was Mrs. Carter who signed the statement authorizing the work, however, but she denies it and Mr. Carter claims it was he who signed it. Mr. Carter disconnected the system inside the residence and helped to take down the outside dish. Respondent moved the dish from the Carter's old residence to their new residence where it was to be reinstalled. Respondent did not pull a permit from the City of Belleair Beach to construct the base for the antenna dish. A permit was required. Mr. Linton claims he did not dig the hole for the base into which he poured the cement but that the base hole was dug by Mr. Carter. Mr. Carter denies having done so. Whoever dug the hole, it did not meet code requirements since it was only 20 inches deep and the code requires a base of concrete at least 48 inches deep. The length and breadth of the slab depends on the size of the satellite dish and the length of the pole on which it will be affixed. The Carters deny that they agreed to pull the permit for this work, claiming that since they are not the owners of the property, they cannot do so. This is not so, however, because, under the terms of the Code, (Section 6- 3(a)(1), either the owner of the property or the authorized agent of the owner can pull the permit. If authorized by the owner of the new residence, either the Carters or the contractor may have pulled the permit. Neither did. Respondent claims he was hired by the Carters only to help them move their satellite system. He was to be paid between $300.00 and $350.00, and Mr. Carter was to help. Because Carter and Mr. Moore, the building official, were old friends, Carter was to pull his own permit and that was put on the invoice. The Carters claim this notation was not there when they signed the invoice. Respondent claims he would have charged $150.00 extra to pull the permit. Respondent admits he holds himself out as a communications systems contractor and that he was retained by the Carters to do work related to the move of their satellite system from one residence to another, but only to help Mr. Carter. He admits he knew a permit was required for the construction of the new base and, though he may not have known whether a permit had been pulled before he poured the new base, he did not pull it himself or insure that one had been pulled. He now admits he should not have relied on the Carters' representations that they would take care of it. He also did not insure that the base which was poured conformed to the requirements of the approved engineering for the installation. The city's building official, Mr. Moore, inspected the work site, on two separate occasions. He first found the hole to be too shallow. When he came back to reinspect, the cement had been poured and he could not gauge the depth, finally accepting the certification of the subsequent contractor that the base conformed to specifications. The conforming work was not done by Respondent but by a subsequent contractor hired by the Carters, Satellite Communications and Electronics, Inc. The Carters were billed an additional $250.00 for this follow up work. This included a fee of $150.00 for pulling the required permit.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Pinellas County Construction Licensing Board enter a Final Order finding Respondent guilty of the offenses alleged, placing his license on probation for six months, and imposing an administrative fine of $250.00. DONE and ENTERED this 12th day of April, 1996, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of April, 1996. APPENDIX TO RECOMMENDED ORDER, CASE NO. 95-5933 To comply with the requirements of Section 120.59(2), Florida Statutes (1993), the following rulings are made on the parties' proposed findings of fact: Petitioner's Proposed Findings of Fact. None submitted. Respondent's Proposed Findings of Fact. Respondent's counsel did not number the facts urged in that portion of his submittal described as "Respondent's version Of The Facts." Therefore, the four paragraphs in that section will be addressed individually. Accepted. Accepted, but the contractor must not begin work without a permit being issued. Not a proper Finding of Fact but a comment on the state of the evidence. Accepted. COPIES FURNISHED: William J. Owens Executive Director Pinellas County Construction Licensing Board 11701 Belcher Road, Suite 102 Largo, Florida 34643-5116 Louis Bakkalapulo, Esquire The Wilder Center Suite 404 3000 Gulf to Bay Boulevard Clearwater, Florida 34619

Florida Laws (1) 120.57
# 1
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION vs CLIFFORD GRANDMONT, 06-003278 (2006)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Aug. 31, 2006 Number: 06-003278 Latest Update: Feb. 27, 2007

The Issue The issue is whether Respondent undertook to act as a contractor without a license as charged in the Administrative Complaints, and if so, what disciplinary action should be taken.

Findings Of Fact Pursuant to Section 20.165, the Division of Professions is a subordinate unit of the Department of Business and Professional Regulation (the Department). The Department provides administrative support, including prosecutorial support to the Construction Industry Licensing Board (the Board), which is also located within the Department. Mr. Grandmont is not currently licensed as a State Registered or State Certified Contractor in this state, nor has he ever been licensed by the Board. Mr. Grandmont's last known address is 355 China Berry Circle, Davenport, Florida. He was provided notice of the hearing at that address, and at 7733 Park Road, Charlotte, North Carolina 28210, which is the address he used when demanding a hearing on disputed facts in two of these cases. In DOAH Case No. 06-3279, he provided no address in his demand for a hearing. All attempts by U. S. Mail to notify Mr. Grandmont of the hearing, were returned. Mr. Grandmont is deemed to have known of the time, date, and place of the hearing, and is deemed to have waived his appearance at the hearing. On November 11, 2005, subsequent to Hurricane Wilma, Robert L. Coe, of Lake Worth, Florida, was contacted by Mr. Grandmont, who offered to repair his damaged mobile home. He provided a written estimate of $10,500. The estimate contained a list of 11 items requiring repair, and stated that he would accomplish the repair of them. He demanded a $4,200 down payment, which Mr. Coe provided in a draft drawn on Fidelity Cash Reserves, and dated November 11, 2005. Mr. Coe never saw Mr. Grandmont again. The repairs set forth in the written estimate were not accomplished. The draft, however, was negotiated by Mr. Grandmont. On November 12, 2005, subsequent to Hurricane Wilma, Joseph Webster, of Lake Worth, Florida, was contacted by Mr. Grandmont, who offered to repair his damaged residence. Mr. Grandmont discussed charging $13,500 in return for repairing Mr. Webster's residence. After negotiations, Mr. Grandmont agreed to do it for $11,500. No written estimate or contract was prepared. Mr. Grandmont demanded $5,750 payment in advance. Mr. Webster rounded off the down payment to $6,000 and presented Mr. Grandmont an official check of the Taunton Federal Credit Union, of Taunton, Massachusetts, for that amount. The check was negotiated by Mr. Grandmont, but the promised repairs were not accomplished. On November 4, 2005, subsequent to Hurricane Wilma, Ella Arseneau, of Lake Worth, Florida, was contacted by Mr. Grandmont, who offered to replace her roof. He provided an estimate of $5,500 in return for repairing Ms. Arseneau's residence. He demanded that she pay $3,500 in advance, which Ms. Arseneau provided by presenting Mr. Grandmont a check for $3,500, drawn on an account in Wachovia Bank. The check was negotiated by Mr. Grandmont, but the roof was not repaired as promised. Mr. Coe is 78 years of age, Mr. Webster is 85, and Ms. Arseneau is 77.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Business and Professional Regulation impose a fine upon Clifford Grandmont in the amount of $30,000. DONE AND ENTERED this 28th day of November, 2006, in Tallahassee, Leon County, Florida. S HARRY L. HOOPER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th of November, 2006. COPIES FURNISHED: Brian A. Higgins, Esquire Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-2202 Clifford Grandmont 7733 Park Road Charlotte, North Carolina 28210 Nancy S. Terrel, Hearing Officer Office of the General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792 Simone Marstiller, Secretary Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792 Josefina Tamayo, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (6) 120.5720.165489.105489.113489.127489.13
# 3
TONY L. PHILLIPS vs DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD, 15-005003 (2015)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Sep. 09, 2015 Number: 15-005003 Latest Update: Nov. 23, 2016

The Issue Whether Petitioner’s application for a certified building contractor’s license should be granted, and whether Respondent relied upon an unadopted rule in formulating its intended decision to deny Petitioner’s application, in violation of section 120.57(1)(e), Florida Statutes (2015).1/

Findings Of Fact Respondent, Construction Industry Licensing Board (Respondent or Board), is charged with administering chapter 489, Part I, Florida Statutes, relating to construction contracting, and issuing licenses to certified building contractors. Petitioner, Tony L. Phillips, applied to the Board for a certified building contractor’s license, pursuant to section 489.111, on March 3, 2015. Petitioner passed the required written examination and his application was scheduled for hearing before the Board on May 14, 2015. Building contractors are licensed to construct commercial buildings, and single-dwelling or multiple-dwelling residential buildings, not exceeding three stories in height. See § 489.105(3)(b), Fla. Stat. Section 489.111(2)(c)2. provides eligibility for licensure as a construction contractor. An applicant is eligible for licensure by examination if he or she has a total of at least four years of active experience as a worker who has learned the trade by serving an apprenticeship as a skilled worker who is able to command the rate of a mechanic in the particular trade or as a foreman who is in charge of a group of workers and usually is responsible to a superintendent or a contractor or his or her equivalent, provided, however, that at least 1 year of active experience shall be as a foreman. (emphasis added). Florida Administrative Code Rule 61G4-15.001(2)(a), provides the qualifications for certified building contractors, in pertinent part, as follows: In the case of applicants for certification in the general or building contractor categories, the phrases ‘active experience’ and ‘proven experience’ as used in Section 489.111(2)(c)1., 2., or 3., F.S., shall be defined to mean construction experience in four or more of the following areas: Foundation/Slabs in excess of twenty thousand (20,000) square feet. Masonry walls. Steel erection. Elevated slabs. Precast concrete structures. Column erection. Formwork for structural reinforced concrete. (emphasis added). In his application, Petitioner listed his experience as a foreman with Jacobs Engineering Group, Inc. (Jacobs), to meet the statutory and rule requirements for active experience in the trade. At all times relevant hereto, Jacobs was a construction engineering inspection consultant for the Florida Department of Transportation (FDOT). Jacobs performed the inspection of various design-build roadway projects undertaken by construction contractors on behalf of FDOT. Petitioner’s application included three specific projects to demonstrate Petitioner’s relevant experience: Wekiva Parkway, John Young Parkway Extension, and Baseline Road. The Wekiva Parkway project consisted of a four-lane highway, three category one bridges, a toll gantry, and equipment enclosure. The general contractor charged with construction of this project was the De Moya Group. Jacobs performed the construction engineering inspection role for FDOT. Jacobs’ role was quality control and inspection. Petitioner indicated in his application that he was the foreman “charged with overseeing the construction of the work on the bridges, roads and related structures.” Jacobs employed Petitioner as a foreman of Jacobs’ employees, who conducted inspections of construction work performed by the De Moya Group. Petitioner’s duties on the Wekiva project were to perform inspections. Petitioner did not perform construction duties, but rather inspected the construction performed to ensure compliance with the applicable FDOT and contractual requirements. While Petitioner’s inspection duties were vital to ensure the soundness of the facilities under construction, he did not perform construction work. The John Young Parkway project consisted of a flyover over State Road 441, including a large steel girder with integral pier box flyover bridge, sound walls, signalization, sidewalks, asphalt, and reinforced earth walls. The general contractor charged with construction of this project was Southland Construction. Jacobs performed the construction engineering inspection role for FDOT. Petitioner was project foreman for Jacobs on the John Young Parkway project. As such, Petitioner was responsible to ensure that the work was performed in accordance with the contract documents. Petitioner did not perform any construction work or supervise the construction workers employed by Southland Construction. As senior roadway inspector on John Young Parkway, Petitioner had the authority to question the work of the construction crew, and redirect work if it was not being performed per the contract documents or FDOT specifications. If necessary, Petitioner, through the chain of command at Jacobs, could stop work on the project in order to conform work to specifications. However, Petitioner did not perform any construction work on the project. The Baseline Road project consisted of small bridges, small animal crossings, noise walls, drainage structures and gravity walls, signalization, curb gutters, and sidewalks. The general contractor charged with construction of this project was C.W. Roberts Contracting. Jacobs performed the construction engineering inspection role for FDOT. On the Baseline Road project, Petitioner supervised the inspection of all animal crossing structures, as well as the relocation and installation of utilities, and the movement of traffic through the construction site. Petitioner admitted that all of the technical qualifications listed in his application were earned as a Jacobs’ employee performing the task of construction engineering inspection on these three projects. All of the experience Petitioner listed in his application was in the execution of projects performed on behalf of FDOT. None of the job descriptions which Petitioner listed in his work experience as road inspector, bridge inspector, utility coordination facilitator, environmental monitoring personnel, and administrator of maintenance of traffic contracts is considered “construction” by the Board. In fact, contracting work on roads, bridges, streets, and highways is exempt from regulation as construction contracting. See § 489.103(1), Fla. Stat. Thus, even the work performed by the FDOT contractors on those three projects was not “construction” subject to regulation by the Board. The single building or enclosed structure of any kind that Petitioner had any involvement with over the four years of work experience offered in his application was a one-story concrete enclosure to house toll-reading equipment. Petitioner did not supply any further information on this structure. It is clear from the record that Petitioner did not perform any of the construction work himself nor was he a foreman on any of the construction crews. All of the work that he performed concerned the inspection of work performed by construction contractors. Petitioner admitted that he has never built, or supervised the construction of, a single, two, or three-story, habitable, commercial, or residential building. Unadopted Rules Petitioner alleges that Respondent relied upon non- rule policy in formulating its decision to deny Petitioner’s application, in violation of section 120.57(1)(e). Section 120.57(1)(e)1. prohibits agencies from basing agency action that determines the substantial interests of a party on an unadopted rule. The denial of Petitioner’s application for a building contractor’s license affects Petitioner’s substantial interests. A “rule” is “an agency statement of general applicability that implements, interprets, or prescribes law or policy.” § 120.52(16), Fla. Stat. Agencies are required to adopt each agency statement defined as a rule by rulemaking procedures set forth in section 120.54. See § 120.54(1)(a), Fla. Stat. Petitioner alleges Respondent maintains three statements which constitute rules, pursuant to section 120.52(16), but which have not been adopted as rules, pursuant to section 120.54, and relied on those statements in formulating its decision to deny Petitioner’s application, in violation of section 120.57(1)(e). First, Petitioner maintains the Board denied his application because, on the jobs he submitted to demonstrate his relative experience, he could not “hire or fire” contractors and did not control the “means and methods” of construction. Because these terms are not used in the controlling statute or rule, Petitioner argues that the Board relied upon statements of general applicability which have not been adopted as rules.2/ During the hearing on Petitioner’s application, two of the seven Board members, Mr. Boyette and Mr. Cathey, questioned Petitioner about whether he had control over the “means and methods” of construction on the projects he listed in his application. Both Board members concluded that, on the projects Petitioner listed as experience relevant to the building contractor’s license, he did not control the “means and methods” of construction. “Means and methods” of construction is a term of art in the construction industry referring to the plans for executing the work on a particular project. The term encompasses scheduling different aspects of a project and directing the work of a construction crew and, sometimes, subcontractors. A construction foreman has the ability to direct a construction crew and subcontractors. Thus, having control of the “means and methods” of construction is integral to the job of a construction foreman. At the hearing on Petitioner’s application, one of the members, Mr. Boyette, questioned whether Petitioner had authority to hire and fire C.W. Roberts, the prime contractor on the Baseline Road project. A construction foreman may have the authority to hire and fire members of a construction crew, depending on the size of the job. The record reflects that Petitioner’s application was denied because he did not meet the requirements for “active experience” in construction, as defined in the rule, not because he was not empowered to hire and fire members of the construction crew. Second, Petitioner contends that the Board refused to accept an affidavit certifying his construction experience, which is contrary to the rule requirements, thus applied an unadopted rule in reaching its decision to deny his application. Rule 61G4-15.001(1)(a) provides that “[a]ctive experience in the category in which the applicant seeks to qualify shall be verified by affidavits prepared or signed by . . . an architect or engineer . . . who is licensed in good standing . . . listing chronologically the active experience in the trade, including the name and address of employers and dates of employment (which may be corroborated by investigation by the Board). Petitioner did not submit an affidavit with his application. Respondent does not contend Petitioner’s application was denied for failure to include the affidavit with his application. At hearing, Petitioner introduced an affidavit from Anthony Caruso, Petitioner’s supervisor at Jacobs. In the affidavit, Mr. Caruso certified that Petitioner “has more than four years proven experience as a foreman” in the following areas of construction work: [f]oundation/slabs in excess of twenty thousand (20,000) square feet, [s]teel erection, [e]levated slabs, [p]recast concrete structures, [c]olumn erection, and [f]ormwork for structural reinforced concrete (six of the seven criteria listed in rule 61G4-15.001). At hearing, Respondent’s expert, Paul Del Vecchio, a certified general contractor and former 12-year member of the Board, testified that the Board does not rely on affidavits to verify an applicant’s active experience. Mr. Del Vecchio related that the Board had been advised it had no statutory authority to require an affidavit and had discontinued accepting affidavits pursuant to the rule.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Business and Professional Regulation, Construction Industry Licensing Board, enter a final order denying Petitioner’s application. DONE AND ENTERED this 10th day of March, 2016, in Tallahassee, Leon County, Florida. S SUZANNE VAN WYK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of March, 2016.

Florida Laws (10) 120.52120.54120.569120.57120.68489.101489.103489.105489.107489.111
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. THOMAS J. EMBRO, 81-001706 (1981)
Division of Administrative Hearings, Florida Number: 81-001706 Latest Update: Apr. 16, 1982

Findings Of Fact The Respondent, Thomas J. Embro holds two licenses issued by Petitioner. They are RG0021774, registered general contractor, and RC0021647, registered roofing contractor. He has held these licenses since 1974. Sometime in the fall of 1979 Respondent was hired by Richard F. Rogers to replace the roof on a residential structure located at 4119 N.W. 12th Avenue, Gainesville, Florida. At that time the house was for sale. Mr. Rogers, who is a real estate agent, wanted the roof replaced in anticipation of a Veterans Administration financed sale of the house to Mr. William Schrader. Prior to beginning work on the roof Mr. Embro did not obtain a building permit from the City of Gainesville for the job. On October 1, 1979 Mr. Schrader made a complaint to the Building Division of the City of Gainesville. His complaint stated that the roofing work performed by Respondent was unsatisfactory. Mr. Al Davis, a building inspector employed by Gainesville, reviewed the city records and determined that a permit had not been issued to Respondent for reroofing Mr. Schrader's house. On October 3, 1979 Mr. Davis wrote a letter to Mr. Embro which stated in its entirety: October 3, 1979 Mr. Thomas J. Embro 3816 SW 18 Street Gainesville, Florida Dear Sir: We have received a complaint from Mr. Bill Schrader of 4119 NW 12th Avenue on the reroofing that you performed on his residence. After receiving the complaint I investigated out records and the work performed by your company and found the following violations: Our records indicate that a permit was not issued to reroof the above address, this is a violation of Section 106.1 of the Southern Standard Building Code. The roof material was not installed correctly. Shingles shall be installed in accordance to manufacture [sic] re- quirements and some parts of the roof are too flat for shingles. Interior damage has been caused by the roof leaking from not installing the shingles as required. The above violations shall be corrected within 10 days from receipt of this letter. Your compliance will make further action unnecessary. Sincerely, /s/ Al Davis Building Official cc: Mr. Bill Dow, State Investigator Mr. Bill Schrader Mr. Embro applied on October 25, 1979 for a permit from Gainesville for the work at 4119 N.W. 12th Avenue. The permit was issued on December 6, 1979. It is not unusual in Gainesville for a contractor to begin a construction job before the appropriate permit is applied for or issued. When this is not a frequent practice of a particular contractor the City imposes no penalty. If the contractor habitually begins construction without permits, the City imposes a penalty by charging him double the regular permit application fee. Mr. Embro was not charged a penalty by the City in this case. In the course of his contracting business Mr. Embro frequently asked his wife to make permit applications for him before he begins work. In this case he believed that she had applied for the appropriate permit. The City of Gainesville allows persons other than the contractor to apply for a building permit on behalf of a contractor if the contractor has first filed an authorization with the City designating an agent. Mr. Embro filed such an authorization on February 13, 1980 for his wife to be his designated agent.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Department of Professional Regulation, Florida Construction Industry Licensing Board enter a final order dismissing the Administrative Complaint against Thomas J. Embro. DONE and RECOMMENDED this 16th day of November, 1981, in Tallahassee, Florida. MICHAEL PEARCE DODSON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of November, 1981.

Florida Laws (3) 120.57489.12990.202
# 7
CORE CONSTRUCTION COMPANY vs UNIVERSITY OF NORTH FLORIDA, 09-001567BID (2009)
Division of Administrative Hearings, Florida Filed:Jacksonville, Florida Mar. 25, 2009 Number: 09-001567BID Latest Update: May 27, 2009

The Issue The issue to be determined is whether Respondent's proposed award for ITB 09-22 for Building 14B renovation is contrary to law, against the University's governing statutes, rules or policies or the specifications of the invitation to bid.

Findings Of Fact The University of North Florida published its Notice of Bid/Request for Proposal in reference to ITB #09-22 entitled "GC's for Building 14B Renovation" on December 19, 2008, with a submission deadline of January 27, 2009. The opening date was eventually extended to January 30, 2009. There were four addendums to the ITB #09-22 Project. The Notice of Bid/Request for Proposal document contained the following provisions: This project consists of the following scope of work: The work includes all labor, supervision, equipment, and materials required to execute the Contract Documents in two phases for the tenant build-out of the existing UNF Building 14-B (approximate square footage 9742). The work includes, but is not limited to, demolition of all interior walls, finishes, mechanical, electrical, plumbing and communication components as well as a new exterior curtain wall system. Exterior construction will include new glazing in aluminum curtain wall. Interior construction will include new gypsum wallboard partitions with metal stud walls, millwork, suspended acoustical and gypsum wallboard ceilings, wood and metal doors in hollow metal frames, coiling overhead grilles, toilet partitions and vanities. Interior finishes include carpeting, resilient tile, ceramic tile, painting, and window treatments. Mechanical work includes installation of new Owner provided HVAC units with ductwork and all necessary connections to the UNF Central Plant chilled water system. Plumbing includes new piping and fixtures for the tenant build-out and renovation of the group male and female restrooms. Electrical work includes new wiring, devices and lighting for the new tenant build-out. Successful bidders must have demonstrable previous experience with the described systems and technical requirements. All bidders must be qualified at the time of the bid opening in accordance with the Bidders Qualification within the ITB 09-22 Bid documents. . . Article I, Section 2 includes a heading in bold stating "Qualification Criteria." This section states: Participants must qualify to bid on this project. UNF will utilize the following criteria to qualify the general contractors within this ITB. The information must be completed on the UNF Qualifications Form provided (page 10-11): Bonding: Demonstrates a bonding capacity of at least $2 million dollars and has an A.M. Best Rating of "A-V" or better. Licenses: Company is licensed to do business in the state of Florida and approved by the US Department of Treasury listing as an acceptable surety. Project references: Company has successfully completed at least 3 commercial construction projects of more than $1 million dollars each in the past three (3) years. List 3 such projects to include project name, client name, completion date, location, project value, role in project. Reference: Project name, owner, owner's representative name/phone number, completion date and construction cost. Years of experience: Company has a minimum five (5) years of GC experience under the current company name. The directions for the General Contractor's Qualification Summary, under Related Experience, reiterated that the bidder was to list "No more than 4 projects of comparable type, size and complexity. (1) Project must be for a college/university)." Addendum I for the Project, issued January 9, 2009, clarified that the requirement for having completed successfully a project of similar size and scope at a Florida University in the last three years is a qualification factor for this project. Addendum II, issued January 12, 2009, removed the requirement for bidders to have completed one project for a college or university. The other two addenda did not address contractor qualifications. Petitioner, Core Construction Company (Core Construction or Petitioner) bid in response to the ITB. Approximately 19 other bidders also responded. Core Construction was the apparent low bidder on the project, with a bid of $1,073,000. There was some concern expressed by the architect reviewing the bids because the bids were all within ten percent of each other for the top bidders, with the bidders 2-10 being within six percent of each other. In an e-mail to Dianna White, the Senior Buyer for UNF purchasing, Mr. Norman stated: Overall there was a 20% range in bid prices which I attribute to a significant difference in the size, quality and abilities of the contractors that bid this project. The apparently low bidder was $60,516 below the second low bidder and $83,000 below the third low bidder. This is a significant concern since there is only $46,484 between the second and fifth low bidders. I suggest the apparent low bidder be contacted and asked if they feel comfortable with their bid, because it appears to me they are missing something significant in their pricing. Purchasing should also carefully review their current financials and current bonding capacity if this is allowed. Project reference checks, price verification against the architect's construction estimate and bonding checks were performed with respect to the four lowest bidding companies: Core Construction, Pooley Contracting, Rivers & Rivers and Warden Construction. Pooley Contracting, the second-lowest bidder, was disqualified as non-responsive because its bid package did not include a bonding letter. Core provided the names of three completed projects that were valued at over one million dollars. Dianna White called each of the references provided, not only for Core but for three of the four lowest bidders. The same questions were asked of each reference for each company: 1) Was the project on time and within budget; 2) Did the project run smoothly; 3) Were project issues handled; and 4) Would you use the contractor again. Calls related to Pooley Contracting were not completed because it was disqualified as non-responsive. While the references for Rivers & Rivers and Warden were consistently good, two of the three references received for Core were not. Ms. White described them as the most "strongly negative" references she had ever received. In particular, the references indicated difficulty in completing jobs within budget and on time, which the Respondent viewed as the basis for determining whether a contractor had successfully completed a project. Two of the references indicated that they would not use the contractor again, or as one put it, "not if there was any way around it." Based on the recommendations received, the Purchasing Office for the University recommended that Core Construction be disqualified for failing to demonstrate successful completion of three projects over one million dollars that were similar in scope. Because Pooley Construction was also disqualified, the Purchasing Department recommended that the Project be awarded to the third-lowest bidder, Rivers & Rivers. The recommendation to award the project to Rivers & Rivers was accepted by the Vice President of Administration and Finance, and on February 18, 2009, a Notice of Award issued identifying Rivers & Rivers as the company receiving the award. On February 19, 2009, Core Construction notified Respondent that it intended to protest the award of the Project to Rivers & Rivers. On February 24, 2009, Core Construction provided a $10,000.00 surety bond and a written protest of the award. The basis of the protest was two-fold. First, Core Construction contended that Rivers & Rivers did not meet the qualification criteria set out in the ITB, because it was did not have a minimum of five years of general contractor experience under the current company name. Second, Core felt that the poor references received should not be a basis for disqualification. Upon receiving the bid protest, Respondent contacted Rivers & Rivers to verify its licensure status. Upon inquiry, it was determined that while the principals of the company had over 30 years of experience, the Rivers & Rivers entity had not been licensed under that name for the requisite five years. While no action has been taken while this bid protest is pending, Respondent indicated its intention to withdraw the award from Rivers & Rivers and award the contract instead to the next lowest bidder. The procedures used by the University in determining the appropriate award were not contrary to law, against the University's governing statutes, rules or policies or the specifications of the invitation to bid. It was consistent with University policy to check references for projects of similar scope and size. Therefore, it was appropriate to ask for and check references for projects of over one million dollars. There is no indication that any bidder questioned what the University would consider as successful completion of a project. The time for questioning this issue would have been when the specifications were issued, consistent with Article I, Section 7 of the ITB. Having a project come in on time and within budget is a reasonable measure of successful completion. It is not the same as "substantial completion," which generally refers to a point of time in the construction process, not the final completion of the project.

Recommendation Upon consideration of the facts found and conclusions of law reached, it is RECOMMENDED: That the President of the University of North Florida, pursuant to his authority under Board of Governor's Regulation 18.002, enter a final order dismissing Petitioner's written protest. DONE AND ENTERED this 30th day of April, 2009, in Tallahassee, Leon County, Florida. S LISA SHEARER NELSON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 30th day of April, 2009. COPIES FURNISHED: Jay H. Chung Core Construction Company, Inc. 4940 Emerson Street, Suite 205 Jacksonville, Florida 32207 Paul Christopher Wrenn, Esquire University of North Florida J.J. Daniel Hall, Suite 2100 1 University of North Florida Drive Jacksonville, Florida 32224 John A. Delaney, President University of North Florida J.J. Daniel Hall, Suite 2800 1 University of North Florida Drive Jacksonville, Florida 32224