The Issue The issue in this case is whether the Department of Environmental Protection (DEP) should grant the application filed by the DeVries for a coastal construction line (CCCL) permit to build a house (with dolomite drive, septic tank, and drain field) and a dune walkover seaward of the CCCL on their property on the St. Joe Peninsula in Gulf County (Permit GU- 501).
Findings Of Fact The Neighbors Mark and Rita DeVries own 0.163 acre in Block 6 of Peninsular Estates, which is on the St. Joe Peninsula in Gulf County. The St. Joe Peninsula is oriented approximately north and south, with the water of the Gulf to the west. DEP Monument R-83 is on the DeVries' property. Linda McAlpin also owns property in Block 6 of Peninsular Estates seaward of the DeVries' property. She and her husband, Dr. Glenn Mark McAlpin, bought the property in 2001. The dunes on the property had been cleared prior to 1973 for construction of a beach house and driveway. The prior owner's beach house was then damaged by major storms. In 2001 and 2002, the McAlpins got a CCCL permit to build a pile- supported 5,000 square foot, three-story house over a concrete slab used as a parking area, with a dolomite driveway, on her property. There is no private property to the west (i.e., seaward) of her property. In 2006, Dr. McAlpin quitclaimed his legal interest to his wife to insulate it from his potential professional liabilities. Except for the legal consequences of the quitclaim deed, the McAlpins continue to treat the property as a marital asset. Dr. McAlpin continues to handle practically all matters relating to the maintenance of the house, including repairs necessitated by major storms and beach erosion. The Beach and Dune System Besides the McAlpins, there are beach houses to the east (landward) and to the north of the DeVries' property. The house to the north was moved landward from its original location after it suffered major storm damage in 2005. It used to be north of the McAlpin house. There is a house to the south of the McAlpin house. Except for the house that was moved, there is a continuous line of construction seaward of the CCCL to the north and south along the line between the McAlpin house and the house to the south. The McAlpin house also suffered damage from the storms of 2004 and 2005. Sand sediment under the seaward side of the house was scoured out and undermined, and part of the frangible concrete slab and some of the plumbing under that part of the house dropped to the new, lower sand surface. The McAlpins had sand brought in to place under the house and began to build a seawall around the pilings and new sand until the seawall project was halted for failure to obtain a permit. In 2008 and 2009, a beach restoration project was installed on the peninsula, which added sand to the beach and formed a dune immediately seaward of the McAlpin house. There is a dispute whether the DeVries propose to build on a frontal dune. The McAlpins contend that the seaward toe of the frontal dune is seaward of their house, that its crest is on the DeVries' property just east of their common boundary, and that the frontal dune extends landward approximately to the DeVries' common boundary with the property to the east. Michael Dombrowski, P.E., gave expert coastal engineering testimony in support of McAlpins' contention. The DeVries and DEP contend that the beach restoration project re-created the frontal dune that was seaward of the McAlpins' house before the major storms of 2004 and 2005 and that the McAlpins' house sits on a separate primary dune landward of the primary dune. Michael Walther, P.E., and Tony McNeal, P.E., gave expert coastal engineering testimony in support of the contention of the DeVries and DEP. The beach restoration project created a dune, i.e., a mound or bluff of sand, that is landward of the beach, parallel to the shoreline, and continuous in the vicinity. The dune has been planted with native vegetation that is thriving and spreading. Since its installation, the dune has been stable, and sand has been accreting on the dune. The dune is of sufficient vegetation, height, continuity, and configuration to offer protective value up to a major, 40- to 60-year return storm. As such, it is a frontal dune. See § 161.053(5)(a), Fla. Stat. There is a trough between the dune created by the restoration project and dune on which the McAlpins' house sits. (The trough is the landward toe of the frontal dune and the seaward toe of the dune under the McAlpin house). The latter dune system crests at approximately 18 feet North American Vertical Datum of 1988 (NAVD) on the DeVries' property a little landward of the common boundary between the two properties. It is a significant dune in that it has sufficient height and configuration and vegetation (especially on the DeVries' property, which is heavily vegetated) to provide protective value. See Fla. Admin. Code R. 62B-33.002(17)(a). The alterations made to the McAlpin property by the prior owner adversely affected the alongshore continuity of the dune system, but it still is a primary dune in that it affords a measurable level of protection to upland property and structures from the predictable erosion and storm surge levels associated with coastal storm events. See Fla. Admin. Code R. 62B- 33.002(17)(b). The Proposed Beach House The DeVries' application is to build a pile-supported 3,000 square foot, two-story house over a concrete slab used as a parking area, with dolomite drive and a dune walkover. The house would be up to approximately 110 feet seaward of the CCCL, landward of the adjacent McAlpin house, and landward of the 30- year erosion line (DEP's projection of the seasonal high-water line 30 years in the future). It is undisputed that the proposed construction will conform to the requirements of the Florida Building Code. The DeVries' proposed house would be on 18 one-foot square piles, with two eight-inch square piles supporting the wooden deck. This construction method, which is standard, minimizes impacts from erosion and scour. The DeVries propose a septic tank and drain field between the house and the common boundary with their neighbor to the east (i.e., the landward side of the property). This optimal location for the septic tank and drain field is made possible by the orientation and dimensions of the proposed house (a relatively narrow rectangle with the longer sides in the north-south direction). Petitioners contend that impacts should be minimized by requiring construction of a narrower, taller structure. The footprint already is smaller than the footprint of the McAlpins' house. Requiring a further reduction would create problems in the design of the interior space of the house. It was proven that the dimensions of the house proposed by the DeVries is reasonable and sufficiently minimizes impacts. There will be no net excavation of in situ sand for the construction authorized in proposed Permit GU-501. Sand excavated for the septic tank and drain field, along with additional sand brought to the construction site, will be used to fill a bowl-like feature in the middle of the DeVries' property and level the ground for the concrete slab under the DeVries' proposed house. There will be a net addition of sand to the site. The concrete slab beneath the DeVries' proposed house is designed to be partially cut so as to break into smaller pieces in a catastrophic storm event and not cause collapse, displacement, or other structural damage to the elevated portion of the building or supporting foundation system. Cf. Fla. Admin. Code R. 62B-33.002(9). The concrete slab proposed beneath the house was reduced in size to eliminate a roughly seven-foot by 16-foot rectangle in the northwest corner and not to disturb a higher dune feature that exists in that location. Petitioners contend that the DeVries' concrete slab could be further reduced in size to minimize impacts to the primary dune. However, it was proven that the size of the concrete slab is reasonable and sufficiently minimizes impacts. The driveway authorized by proposed Permit GU-501 will narrow from approximately 30 feet wide at the house to approximately 12 feet at the County right-of-way, which reduces impacts (and is narrower than the McAlpins' driveway). Petitioners contend that the driveway should be narrower to minimize impacts. It was proven that the width of the proposed driveway is reasonable and sufficiently minimizes impacts. Frangible curbing is proposed along both sides of the driveway. This will prevent or discourage driving elsewhere on the lot. The Proposed Dune Walkover The DeVries' proposed dune walkover would be connected by stairs to a wooden deck off the northern end of the first story of the house. From the stairs, the dune walkover proceeds for a short distance in a northerly direction, then proceeds in a westerly direction towards the beach within a 10-foot wide access easement. It would be four feet wide and at least two feet above the ground surface and would pass within ten to 20 feet of the north side of the McAlpins' house. It would be supported by four-inch by four-inch wooden piles. Petitioners contend that the DeVries' proposed dune walkover should be denied because there is a public beach access off White Sands Drive approximately 500 feet to the south. The purpose of the dune walkover would be to avoid the impacts that would occur if people staying at the DeVries' beach house use the beach access easement instead of the public access. The existence of the public access is not a ground to deny private beach access via a dune walkover that meets CCCL permitting criteria. Petitioners also contend that the proposed dune walkover should be denied because a ground-level foot path was not considered. Since the purpose of the dune walkover is to avoid the impacts of an on-grade footpath, that option was considered and rejected. Petitioners contend that the proposed dune walkover should be reduced to three feet. But it was proven that the proposed four-foot width is standard and reasonable; that the construction method already minimizes impacts; and that the impacts from a three-foot wide walkover would not be much less than the proposed walkover. Petitioners also contend that the DeVries' dune walkover should use rounded piles, not square ones as proposed. They base this contention on DEP's Beach and Dune Walkover Guidelines (Dune Walkover Guidelines), which state that rounded piles are preferred. Rounded piles are not mandatory, and it was proven that the proposed piles are reasonable and sufficient. Petitioners contend that the proposed dune walkover actually is wider than four feet overall because the application drawings make it appear that the wooden piles are outside the walkway. However, it was proven that the drawings are in error to that extent and that the maximum width of the dune walkover actually will be four feet, as required by special condition 8 of proposed Permit GU-501. Petitioners contend that the proposed dune walkover must be denied because the site plan depicts it as terminating on the frontal dune created by the 2008 beach restoration project, which is contrary to the Dune Walkover Guidelines. Petitioners also contend that, while the Dune Walkover Guidelines require adequate elevation to clear the vegetation on the dunes, every part of the proposed walkover may not clear the dune entirely, according to the elevations in the site plan and construction drawings in the DeVries' application. Special condition 8 of proposed Permit GU-501 addresses Petitioners' contentions. It requires the proposed dune walkover to extend up to (but more than ten feet seaward of) the existing line of vegetation (not the line of vegetation at the time of the survey included as part of the DeVries' application) and requires that "the deck of the walkover structure shall maintain an elevation above the existing dune vegetation canopy . . . ." Also, under special condition 8, "[t]he optimum siting of the walkover structure shall be determined by the [DEP] staff representative during the preconstruction conference to provide maximum protection to the existing dune topography and vegetation located on the site." This will ensure compliance with the Dune Walkover Guidelines, which defines optimal siting. Petitioners contend that the proposed dune walkover must be denied because the DeVries' beach access easement does not extend to the existing vegetation line. Proposed GU-501 does not authorize a trespassing. See Fla. Admin. Code R. 62B-33.0155(4). If additional access easement is required to reach the beach, it will have to be acquired. Otherwise, the proposed dune walkover cannot be built. To mitigate for the minimized impacts from the DeVries' proposed construction, special condition 5 of proposed Permit GU-501 requires the DeVries to "plant a mix of a minimum of three native salt-tolerant species within any disturbed areas seaward of the control line, including the septic tank and drain field area." Obviously, there will not be mitigation planting where the concrete slab and dolomite driveway will be. The plants must be indigenous species or approved by DEP, and "a minimum of 80 percent of the planted areas shall be covered with the selected species." Sod and planting invasive nuisance species are not authorized. In addition, the site plan, which is part of the application, has a proposal to "maintain [planted native vegetation] adequate by temporary irrigation." Petitioners contend that the GU-501 conditions are not sufficient because the indigenous plants are not specified. However, the evidence provided reasonable assurance that appropriate species would be planted. Petitioners also contend that the GU-501 conditions are not sufficient because the success criteria are inadequate. Specifically, Petitioners compare the 80 percent coverage requirement in special condition 5 with the 90 percent success rate after 180 days and after 360 days required by the conditions of the beach restoration project. The beach restoration project's conditions could be viewed as less strict than the GU-501 conditions. In any event, the GU-501 conditions provide reasonable assurance of mitigation of the impacts. Petitioners contend that temporary impacts are not mitigated. However, temporary impacts will be minimized by special conditions 1 (pre-construction conference) and 3 (requirement of optimal construction fencing, including to protect the dune feature at southwest corner of the DeVries' property), 4 (only minimum disturbance required for construction allowed), and 9 (requirement to remove all rubble and construction debris to a location landward of the CCCL). This small level of risk from temporary disturbances during construction and before mitigation plantings take hold is unavoidable. It does not warrant the denial of a CCCL permit. In accordance with DEP's requirements, the proposed dune walkover is designed as a minor, expendable structure, and partitions of the house are designed to break away or be "frangible"—i.e., to "collapse from a water load less than that which would occur during a 100-year storm event without causing collapse, displacement, or other structural damage to the elevated portion of the building or supporting foundation system." See Fla. Admin. Code R. 62B-33.002(9). These designs help prevent larger, unmitigated storm damage to the beach and dune system. Due to its proximity, the McAlpins' house could sustain additional damage from the frangible parts of the DeVries' construction during such a storm. However, those risks are contemplated by DEP's frangibility requirements and are relatively small. Those risks do not warrant the denial of a CCCL permit. The County Right-of-Way There is a paved road called White Sands Drive that approaches the McAlpins' dolomite driveway and the proposed location of the DeVries' dolomite driveway from the east. The McAlpins' driveway extends from their house in a southeasterly direction, crosses the County right-of-way for Blue Water Circle (which has not been built), and connects with the paved surface of White Sands Drive in the curve between its east-west segment and its north-south segment. The DeVries' proposed dolomite driveway would terminate at the County right-of-way for Blue Water Circle to the northeast of the McAlpins' driveway, where the elevation is approximately 13 to 14 feet NAVD (similar to the elevation of the McAlpins' driveway). There is a relatively narrow dune feature between the McAlpins' driveway and the DeVries' proposed driveway that rises to an elevation of approximately 19 feet NAVD in the center of the dune feature. This dune is significant in that it has sufficient height and vegetation to provide protective value. See Fla. Admin. Code R. 62B-33.002(17)(a). In itself, it is not a primary dune because it does not have the configuration and alongshore continuity to afford a measurable level of protection to upland property and structures from the predictable erosion and storm surge levels associated with coastal storm events. See Fla. Admin. Code R. 62B-33.002(17)(b). This dune feature extends into the County right-of- way. Depending on the route taken, a car using the DeVries' proposed driveway might drive over or through a small part of the extreme southeastern end of this dune feature. It might be possible to avoid the dune feature entirely by hugging the eastern side of the driveway and, to the greatest extent possible, using the part of the County right-of-way that is used by the neighbor to the east to access their dolomite driveway from White Sands Drive. If not entirely avoiding the dune feature, it would be possible to drive over or through only a very small part of the dune feature where elevations are no greater than 14 to 15 feet NAVD. DEP and the DeVries contend that impacts to the County right-of-way should not be considered because they were not timely raised. However, Petitioners' allegations were broad enough to include consideration of those impacts. DEP and the DeVries also contend that impacts to the County right-of-way are prohibited by general and special conditions. General permit conditions include: Construction traffic shall not occur and building materials shall not be stored on vegetated areas seaward of the control line unless specifically authorized by the permit. If the Department determines that this requirement is not being met, positive control measures, such as temporary fencing, designated access roads, adjustment of construction sequence, or other requirements, shall be provided by the permittee at the direction of the Department. . . . * * * The permittee shall not disturb existing beach and dune topography and vegetation except as expressly authorized in the permit. Before the project is considered complete, any disturbed topography or vegetation shall be restored as prescribed in the permit with suitable fill material or revegetated with appropriate beach and dune vegetation. * * * (j) Any native salt-tolerant vegetation destroyed during construction shall be replaced with plants of the same species or, by authorization of the Department, with other native salt-tolerant vegetation suitable for beach and dune stabilization. Unless otherwise specifically authorized by the Department, all plants installed in beach and coastal areas - whether to replace vegetation displaced, damaged, or destroyed during construction or otherwise - shall be of species indigenous to Florida beaches and dunes, such as sea oats, sea grape, saw palmetto, panic grass, saltmeadow hay cordgrass, seashore saltgrass, and railroad vine, and grown from stock indigenous to the region in which the project is located. Fla. Admin. Code R. 62B-33.0155(3). In addition, special condition 4 of proposed Permit GU-501 states: "Existing vegetation shall be disturbed only to the minimum extent necessary to complete work within the authorized construction limits." Finally, proposed permit GU-501 does not authorize the construction of a driveway through the County right-of-way. See Fla. Admin. Code R. 62B-33.0155(4) (permit does not authorize trespass). Notwithstanding the conditions and limitation of proposed GU-501, it is reasonable to foresee that, to use the proposed driveway, cars will drive through the County right-of- way between the DeVries' proposed driveway and White Sands Drive. The extent to which the dune feature would be impacted must be considered in this case. See Fla. Admin. Code R. 62B-33.002(33) (impacts can be direct or indirect). It appears possible to use the DeVries' proposed driveway and avoid any parts of the dune feature in the County's right-of-way above the 14-foot NAVD elevation by using the part of the right-of-way currently being used for access by the DeVries' neighbor to the east. To minimize impacts, this should be required as an additional condition of GU-501. Construction of the proposed beach house and dune walkover on the DeVries' property will not alter the coastal system by measurably affecting the existing shoreline change rate, significantly interfering with its ability to recover from a coastal storm, disturbing topography or vegetation such that the dune system becomes unstable or suffers catastrophic failure or the protective value of the dune system is significantly lowered. As such, there will be no significant impacts. See Fla. Admin. Code R. 62B-33.002(33)(b).
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that DEP enter a final order issuing GU-501, with an additional condition to use the part of the County's right-of-way currently being used for access by the DeVries' neighbor to the east and avoid any parts of the dune feature in the right-of-way above the 14-foot NAVD elevation to access the DeVries' proposed driveway. DONE AND ENTERED this 2nd day of November, 2011, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of November, 2011. COPIES FURNISHED: Ross Stafford Burnaman, Esquire 1018 Holland Drive Tallahassee, Florida 32301-4508 Kelly L. Russell, Esquire Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 E. Dylan Rivers, Esquire Ausley and McMullen, P.A. 123 South Calhoun Street Tallahassee, Florida 32301-1517 Herschel T. Vinyard, Jr., Secretary Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Tom Beason, General Counsel Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Lea Crandall, Agency Clerk Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000
Findings Of Fact On January 13, 1983, Respondents Donia and Bobowski filed with Monroe County petitions for special use approval to deposit fill and construct an access driveway within the shoreline protection zone of Monroe County as designated by Chapter 4, Monroe County Code. The property on which the roads are proposed to be constructed consists of two lots, each 1.09 acres in size. The lots are contiguous to each other and are located on Sugarloaf Key, Monroe County, Florida. Respondents Bobowski and Donia represented in their petitions for special use approval that they owned or were in the process of purchasing the subject property. Respondent Bobowski submitted with his application a contract for sale to him of both 1.09-acre lots which specified the sale was to be closed by March 25, 1982. Ms. Donia included with her petition a letter stating that Mr. Bobowski was in the process of deeding a portion of his land to her. On January 26, 1983, Respondent Bobowski filed a Complaint for Specific Performance against James Knox Julian, Jr., owner of record of the property for which Bobowski and Donia submitted applications for special use approval. As of September 10, 1984, Julian had filed a motion to dismiss that Complaint on grounds that there had been no pleadings filed or action taken by Bobowski for a period of more than one year. There is no evidence that James Julian authorized Respondents Donia or Bobowski to submit the applications for special use approval on his behalf. Respondents Donia and Bobowski have been sent copies of pleadings in this case. The Monroe County records containing Donia's application for special use approval indicate that Catherine Donia is now Catherine Bobowski. Ms. Bobowski participated in a telephonic conference call between the parties and the undersigned in which she was specifically advised of the scheduled final hearing in this case and of the necessity for her and Thomas Bobowski to appear to present their evidence in support of their applications. Neither she nor Mr. Bobowski, nor any representative of theirs, appeared at the final hearing. On January 20, 1983, Respondents McDonald and Allen filed an application for special use approval to deposit fill and construct an access driveway within the shoreline protection zone of Monroe County as designated by Chapter 4, Monroe County Code. The McDonald/Allen property is a 2.9 acre parcel on Sugarloaf Key in Monroe County Florida. The proposed driveway runs from State Road 939A through a tidally inundated black mangrove community to a dune ridge and tropical hardwood hammock fronting the Atlantic Ocean. The driveway project described in the original application involved the deposit of 433 cubic yards of limerock fill to construct an access driveway 325 feet long, 12 feet wide, and 4 feet deep. Six culverts twelve inches in diameter were to be placed at 50-foot intervals along the access driveway. When the State of Florida Department of Environmental Regulation indicated disapproval of a fill permit as the project was originally proposed, the project was amended to replace the twelve-inch diameter culverts with four box culverts three feet by eight feet. The application for special use approval does not include a request to fill a turnaround area or a pad for a single-family residence, does not include a final set of building plans or a final selection of a house site, and does not seek approval for the placement of a septic tank system. Rather, the application for special use approval seeks permission for the driveway portion of the construction project only. The McDonald/Allen property is located on the southern shoreline of Sugarloaf Key in an area referred to as Sugarloaf Beach. The foreshore or foredune fronting the Atlantic Ocean consists of a beach and berm rising to a dune crest approximately 30 feet from the ocean. The sandy beach is approximately 6 to 15 feet in width. The dune top extends landward from the dune crest for approximately 100 to 125 feet before descending to the back dune and the wet land and transitional areas. The transitional area continues landward approximately 60 feet before descending into the wetlands. The wetlands run landward approximately 300 feet to the property boundary on State Road 939A. The foreshore or foredune of the McDonald/Allen property is covered by sea oats, sea purslane and cord grass assemblage. The entire dune top from the dune crest to the back dune is covered by a mature, climax tropical hardwood association. Species present include: torchwood, white stopper, inkwood, blolly, gumbo-limbo, blackbead, Spanish stopper, Jamaican dogwood, seven-year apple, sapodilla, coconut palm, short-leaf fig, gray nicker, wild lantana, buttonwood, snowberry, prickly pear cactus, bay cedar, and spider lily. The vegetation displays a stratified structure with a high canopy composed of very large, tall trees an indication of a very mature system. The transitional wetland community found on the back dune consists of saltwort, sea daisy, railroad vine, and seagrape. The wetlands-are characterized as submergent wetlands containing black mangroves. The black mangrove community is inundated year round with water depths measured between 6 and 12 inches over the majority of the property. The black mangroves reach heights of 15 feet, with large trees located over the southern extent of the wetlands (adjacent to the upland ridge). Attaining heights of 25 to 30 feet, these larger mangroves form a hammock with an open understory in a dense canopy. The mangrove area is a productive, healthy system. The wetlands of the McDonald/Allen property are a part of a larger area of healthy wetlands approximately 10 acres in extent, bounded by State Road 939A on the north, the dune ridge to the south, an unculverted fill road to the west, and a culverted fill road to the east. Wildlife present on the property include marsh rabbits, raccoons, black crown night herons, little blue herons, Louisiana herons, white crown pigeons, blue crabs, fiddler crabs, mosquito fish, killy-fish, sailfin mollies, and sheepshead minnows. On February 1, 1983, Respondent Stage filed an application for special use approval to deposit fill and construct an access driveway in the shoreline protection zone of Monroe County as designated by Chapter 4, Monroe County Code. The Stage property is a 0.64-acre lot on Big Pine Key in Monroe County, Florida. The proposed driveway runs from Long Beach Boulevard through a wet land area to a dune ridge and hammock fronting the Atlantic Ocean. The driveway project described in the original application called for the deposit of limerock fill to construct an access driveway 100 feet long, 12 feet wide, and 2-3 feet deep along the east side of the lot. Two culverts 12 inches in diameter were to be placed 50 feet apart. When the State of Florida Department of Environmental Regulation indicated disapproval of a fill permit as the project was originally proposed, the project was amended to locate the access driveway through the center of the lot and to replace the 12-inch diameter culverts with two 36-inch diameter culverts to be placed at the base of the access drive. The proposed access road is to lead to a proposed turnaround and a proposed single-family residence on the back dune or dune ridge of the Stage property. The application for special use approval does not include a request to fill a turnaround area or a pad for a single-family residence, does not include a final set of building plans or a final selection of a house site, and does not seek approval for the placement of a septic tank system. Rather, the application for special use approval seeks permission for the driveway portion of the construction project only. The Stage property is located on the southern shore of Long Beach on Big Pine Key. The natural systems of the Stage property are similar in many respects to those of the McDonald/Allen property. The foreshore or foredune fronting the Atlantic Ocean has a shoreline consisting of a dense mangrove fringe. The foredune rises to a dune crest approximately 28 feet landward from the shoreline. The dune top extends landward from the dune crest approximately 100 feet before descending to the back dune and wetland area. The back dune runs landward 40 feet before descending into the wetlands. The wetlands run landward approximately 10 feet to a filled area approximately 75 feet deep fronting Long Beach Boulevard. Landward of the mangrove fringe on the foredune is a dense growth of night shade, behind which the hardwood hammock vegetation begins, at approximately 10 feet from the shoreline. The understory of the hammock has a very rich growth of wild bamboo. Trees in the hammock community include blolly, spider lily, Jamaican dogwood, Keys bamboo, gumbo-limbo, darling plum, seven-year apple, wild dilly and coconut palm. The area along the lower back dune displays transitional vegetation consisting of blackbead, limber caper, sea grape, bay cedar, sea daisy, and remnant black and white mangroves. At lower elevations of the property below the back dune and abutting the roadside fill area are found buttonwood, black mangrove without pneumatophores, saltwort, red mangrove, black mangrove, white mangrove, and sea purslane. The wetland and red mangrove area is about 10 to 15 feet in size, healthy, and of high productivity. The transitional vegetation is productive in that it has a very high value to the organisms that are feeding upon it in that particular area, although its productive value is lower than that of the red mangrove system. Wildlife found on the property include marsh rabbit, raccoon, Key deer, and hermit crabs. Other species expected to be found are the eastern indigo snake the red black snake, and the silver rice rat, all species listed by the federal government as threatened. Both the McDonald/Allen and Stage properties are located in the Florida Keys in Monroe County, which has been designated an area of critical state concern. The Florida Keys is the only tropical area in the entire continental United States. The uncontroverted testimony of witnesses for the Respondents and Petitioner was that virtually every natural feature found there is unique. The Long Beach and Sugarloaf Beach coastal dune structures are particularly significant natural systems because of the scarcity of these sandy beaches and dune systems in the Florida Keys. Such systems have been estimated to represent only 2 percent of the land mass of the Florida Keys. They are even more scarce when considered in reference to the land mass of the United States because there are no comparable natural systems in North America. The dune systems on Sugarloaf Beach and Long Beach are storm berms or storm beaches, which are created when near source material is driven by storm effect onto the beach and ridge. These beaches are stable when highly vegetated and undisturbed. The plant communities found on the dune system have adapted to resist the impact of storms, both wind and wave. Seagrape trees, for example, diminish the shearing effect of the wind by absorbing wind energy. Many of the plant species are deeply rooted and essentially adapted to the intermittent effects of storms. When the natural systems and vegetative communities are altered, the dune system loses its resistance to storm and is subject to instability and erosion. Many of the plant and animal species present in the Florida Keys and on the McDonald/Allen and Stage properties are only found in the Keys. They are endemic species which have deviated from the mother populations on the mainland, and they are of particular interest to the scientific community. The McDonald/Allen property, in particular, is unique because it combines a very mature hardwood system with the coastal dune structure. Maturity of the hardwood hammocks is evidenced by the large dimensions of the trees, especially the gumbo-limbos and inkwood, and the height and structure of the tree canopy. The mangrove wetland areas on the McDonald/Allen and Stage properties could also be called unique by virtue of their location in the Florida Keys, though they are similar to other mangrove wetland areas. They are both productive, healthy systems. Such mangrove systems are considered to be one of the most important natural resources in Southern Florida. They provide shoreline protection, build up land areas, provide nutrients to the marine environment, and serve as nurseries for marine species and wildlife habitat for reptiles and wading birds such as herons, egrets, white crown pigeons and gray king birds. Transitional areas may have lower productivity than the wetland areas, but they still have a very high value to organisms feeding upon them. A community of animals will still be dependent upon the transitional vegetation, and removal or stress to that vegetation will also stress the dependent animal elements. On April 22, 1983, the Zoning Board of Monroe County denied the McDonald/Allen application for special use approval to deposit the fill and construct the access road. Reasons for the denial were that the project failed to comply with Sections 19-75(2)a, 19-111, and 19-59(6), Monroe County Code. Section 19-75(2)a requires a determination of the effect of the change under review on that particular property and on surrounding properties. Section 19- 111(a)(4) requires that all applications for a permit in wetland areas consider the natural biological functions, including food chain production, general habitat, nesting, spawning, rearing and resting sites for aquatic or terrestrial species, the physical aspects of natural drainage, salinity and sedimentation patterns, and physical protection provided by wetland vegetation from storm and wave action. Section 19-59(6) requires consideration of the project's compliance with the County's Comprehensive Plan. The Zoning Board was particularly concerned about the fact that the project was contrary to the policy expressed in the County's Comprehensive Plan to prohibit new construction that would threaten the stability of dune ridges, and about the cumulative impact on the wetland areas and on the dune system of several nearby projects for which applications had been submitted. On August 5, 1983, the Board of County Commissioners reversed the denial of the McDonald/Allen application for special use approval by adopting Resolution No. 233-1983. The Resolution authorizes the deposit of fill and construction of the access driveway as requested by the McDonald/Allen application. The Resolution makes no finding that the project meets the requirements of the Monroe County Code or Monroe County Comprehensive Plan. The Resolution also fails to specify any conditions or protective measures that should be met by the applications in regard to design, construction activities or coordination with adjoining land owners to reduce the impacts of the proposed development. No evidence was introduced at the final hearing in this cause to show that the Board of County Commissioners considered these items or any provision for them. An employee of Petitioner was present at the Monroe County Board of County Commissioners meeting on August 5, 1983, when a vote was taken on the McDonald/Allen application. However, Petitioner did not receive a written copy of the Resolution reducing that action to writing until October 14, 1983, when Monroe County transmitted the Resolution by hand-delivery. On August 25, 1983, the State of Florida Department of Environmental Regulation (hereinafter "DER") issued a permit to McDonald/Allen to deposit 433 cubic yards of fill for an access road with four box culverts three feet by eight feet. The permit is based upon Chapter 403, Florida Statutes, and Chapters 17-3 and 17-4, Florida Administrative Code, jurisdiction and therefore only evaluates impacts on water quality. It does not address impacts on storm surge abatement; marine and wildlife resources habitats; suitability of the proposed project in regard to its location, site characteristics and intended purpose; the effect of the proposed project on surrounding properties (including cumulative impacts of several projects in close proximity of each other); or compliance with the Monroe County Code or Monroe County's Comprehensive Plan. On July 29, 1983, the Zoning Hoard of Monroe County denied the Stage application for special use approval to deposit fill and construct an access road. One of the items considered by the Zoning Board was the permit issued to Respondent Stage by DER on July 13, 1983, to deposit approximately 62 cubic yards of crushed limerock fill for an access road with two 36-inch diameter culverts. The DER permit addressed only impacts to water quality as specified by Chapter 403, Florida Statutes, and Chapters 17-3 and 17-4, Florida Administrative Code. As was the case with the permit issued to McDonald/Allen, the determination by DER to issue the permit did not include the analysis required by the Monroe County Code and the Monroe County Comprehensive Plan of impacts to natural systems. Reasons cited by the Zoning Board for the application's denial are the project's failure to meet the requirements of the Monroe County Code regarding the Suitability of the use in regard to its location, site characteristics, and intended purpose; and the project's failure to comply with the County's Comprehensive Plan encouraging protection of wetlands to the maximum extent possible and prohibiting new construction that would threaten the stability of dune ridges. On October 28, 1983, the Monroe County Board of County Commissioners reversed the denial of the Stage application for special use approval by adopting Resolution No. 296-1983. Again, there are no protective or limiting conditions specified in the Resolution in regard to construction of the road or its relationship to the remainder of the project. The access road proposed by the McDonald/Allen application will eliminate approximately 4,000 square feet of high-quality submerged mangrove wetlands. This, in turn, would eliminate high-quality habitat used by a variety of large birds such as herons, ibises, little blue herons; gastropods; species of small fish such as killifish, sheepshead minnow, sailfin, mosquito fish; blue crabs, fiddler crabs and Saltwater snakes. The proposed fill road would also present a 325-foot long barrier to the existing tidal flow, thereby impeding the natural flow of water, particularly during a storm event when even very large culverts are blocked by vegetation and other debris. A fill road would also provide a substrate for colonization by exotic vegetation, to the detriment and possible exclusion of native vegetation. In addition, the evidence indicates that at least four more fill roads are proposed in immediate proximity to the proposed McDonald/Allen fill road, within the same 10-acre wetland area. If approved, the cumulative impacts of several roads would be significantly greater than the one road. There would be a significant increase in the direct removal of vegetation and wildlife habitat and an even greater impact on tidal flow through the area with each additional road (even ignoring the fact that each road is merely a portion of the real project). This is because each barrier to tidal flow placed downstream from the source water diminishes the ability of the tidal water to reach other areas even further downstream. The essence of Respondents McDonald/Allen's testimony and exhibits in regard to cumulative impacts is that with proper planning only one access road need be built in the 10-acre wetland area in which the McDonald/Allen property lies. No evidence was submitted to show that such planning efforts exist or are likely to be fruitful. There is no reasonable assurance that only one access road will be sought or constructed in that area; rather, the evidence is to the contrary. Respondent Stage's proposed access road would eliminate a small amount of productive red mangroves and would eliminate transitional wetlands of somewhat lower productivity, thereby exacerbating the existing stresses to the transitional community on the Stage property. The road would also be subject to blockage during a storm event, which would further diminish the existing tidal flow. Current intended use of both the McDonald/Allen and Stage properties is for a single-family residence, although neither applicant has finalized any design for that residence. Construction and occupancy of even a single-family residence in the tropical hardwood hammock on the dune back or dune top of either property can be expected to produce a typical range of impacts to the natural systems. The most significant is the removal of hardwood hammock trees and understory vegetation. At a minimum, clearing is required for a house pad, a turnaround (and parking) area, a septic tank and drain field, and a surrounding area sufficient to accommodate construction equipment and workers. Additional clearing can be anticipated by occupants of a single-family residence who seek to take advantage of ocean breezes and view and who create pathways to the beach. Any opening of the hammock's tree canopy or understory would increase exposure of the lower forest to the drying effects of wind and salt and upset the hammock's microclimate, causing progressive destruction of vegetation. Clearing also provides conditions which make the site conducive to colonization by exotic species. Additional impacts customarily associated with single-family residence occupancy are the introduction of pets who are natural predators of endangered species, of noxious chemicals used for spraying insects, and of intrusion into the habitat of wildlife which now utilize the area and are not tolerant of human activity in immediate nesting and feeding areas. Several dwellings constructed on a dune ridge would cumulatively impact and even further threaten destruction of the hardwood hammock and dune system. Once in place and occupied, a single-family home will create impacts that are extremely difficult to prevent or mitigate and which are uncontrolled by any County ordinance or State regulations. The current and future owners of both the McDonald/Allen and Stage properties have access to that property since either a state-- or county-- maintained road borders one entire side of each of those properties. Accordingly, neither proposed driveway is necessary to provide access to the property. Since the special use approvals given by Monroe County to McDonald/Allen and Stage are not conditioned upon the obtaining of permits for the construction of the now-intended dwelling structure, the actual use of the driveways remains speculative. Although the Stage property may be zoned exclusively for a single-family residence, the McDonald/Allen parcel appears to be in an area of Monroe County in which single-family residences are only one of the uses allowed. Additionally, several years ago Respondent Stage, without first obtaining a permit, has placed fill on his property which covers the width of his property along Long Beach Boulevard. Although Respondent Stage eliminated a wetlands area 100 feet by 75 feet by placing fill therein, he has not been required to remove that fill, and it is speculative as to whether any agency with the authority to require the removal of that fill would do so since no mitigation has yet been required of him.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED THAT a final order be entered denying the applications of Respondents McDonald/Allen, Donia, Bobowski, and Stage for special use approval. Pursuant to the requirements of Section 380.08(3), Florida Statutes (1983): There are no changes in the proposal by Respondent Donia that would entitle her to receive the special use approval requested herein; There are no changes in the proposal by Respondent Bobowski that would entitle him to receive the special use approval requested herein; Respondents McDonald and Allen could make their driveway application eligible for a special use approval by altering the design of the driveway to piling or boardwalk construction rather than fill construction; and, Respondent Stage can make his driveway application eligible for a special use approval by altering the project design so that the primary structure utilizes the portion of his property which was previously filled. It is further, RECOMMENDED THAT each application for special use approval submitted herein remain ineligible to receive such approval until such time as it can be demonstrated, such as through the issuance of all necessary permits, that the intended primary use--residential construction--will not degrade or destroy the tropical hardwood hammock, dune ridge, or other natural systems located on or surrounding Respondents' properties. DONE and RECOMMENDED this 8th day of April, 1985 at Tallahassee, Florida. LINDA M. RIGOT Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of April, 1985. COPIES FURNISHED: Honorable Bob Graham Governor The Capitol Tallahassee, Florida 32301 Honorable Bill Gunter Insurance Commissioner The Capitol Tallahassee, Florida 32301 Honorable Jim Smith Attorney General The Capitol Tallahassee, Florida 32301 Honorable Doyle Conner Commissioner of Agriculture The Capitol Tallahassee, Florida 32301 Honorable George Firestone Secretary of State The Capitol Tallahassee, Florida 32301 Honorable Gerald Lewis Comptroller The Capitol Tallahassee, Florida 32301 John T. Herndon, Secretary Florida Land and Water Adjudicatory Commission Office of the Governor The Capitol Tallahassee, Florida 32301 Sheri Smallwood, Esquire County Attorney, Monroe County 310 Fleming Street Key West, Florida 33040 James Hendrick, Esquire Albury, Morgan & Hendrick 317 Whitehead Street Key West, Florida 33040 Catherine Donia Post Office Box 502 Big Pine Key, Florida 33043 Thomas Bobowski Post Office Box 502 Big Pine Key, Florida 33043 Sarah E. Nall, Esquire C. Laurence Keesey, Esquire Department of Community Affairs 2571 Executive Center Circle, East Tallahassee, Florida 32301
The Issue The issue in these cases is whether the Santa Rosa County comprehensive plan, as adopted on September 27, 1990, and the remedial amendments adopted on April 22, 1993, are in compliance.
Findings Of Fact Exception #2. The Hearing Officer, in an October 15, 1993 order, determined that the issues in the consolidated cases would be those 13 issues stated in the petition filed on July 15, 1993, in Case No. 93-4980, which ruling was observed by the parties at the final hearing (RO page 3). Petitioners/Intervenors take issue, thus, "At no time during these proceedings did the Petitioners abandon the issues raised in their Petitions to Intervene filed in the original noncompliance proceeding." The Respondent County and the Petitioner/Respondent Department take the position that the original, noncompliance proceeding was extinguished when the Department issued its cumulative notice of intent pursuant to section 163.3184(16), Florida statutes. The County and the Department further disagree with the Hearing Officer's conclusion of law determining that the issues of public access and Navarre Beach dune system should be determined pursuant to the preponderance of the evidence standard in section 163.3184(10), Florida statutes. The County and the Department urge the Agency to enter its order addressing all issues accordingly. Subsection (9) of section 163.3184, Florida statutes, governs proceedings if the local plan or amendment is in compliance. In the words of the statute, "In this proceeding, the local plan or plan amendment shall be determined to be in compliance if the local government's determination of compliance is fairly debatable." Subsection (10) of section 163.3184, Florida statutes, governs proceedings if the plan or amendment is determined to be not in compliance. The statute specifies, in this subsection: In the proceeding, the local government's determination that the comprehensive plan or plan amendment is in compliance is presumed to be correct. The local government's determination shall be sustained unless it is shown by a preponderance of the evidence that the comprehensive plan or plan amendment is not in compliance. Subsection (16) of section 163.3184, Florida statutes, authorizes the Department of Community Affairs to enter into voluntary compliance agreements to resolve issues raised in proceedings initiated pursuant either to subsection (9) -- in compliance determinations -- or subsection (10) -- not in compliance determinations. It is under this subsection that the cumulative notice in this case was issued. Paragraph (f) of subsection (16) provides, in part, as follows: If the local government adopts a comprehensive plan amendment pursuant to a compliance agreement and a notice of intent to find the plan amendment in compliance is issued, the state land planning agency shall forward the notice of intent to the Division of Administrative Hearings and the pending s. 120.57 proceeding concerning the plan or plan amendment shall be dismissed by the hearing officer as to the department. Any affected person may challenge the plan or plan amendment which is the subject of the cumulative notice of intent by filing a petition with the agency as provided in subsection (9). The language of the statute is somewhat problematic. It is unclear how a proceeding can be dismissed as to one of the parties, in this case, the state land planning agency issuing the notice of intent. See Department of Community Affairs, et al. v. DeSoto County, Final Order No. AC-94-009 (Fla. Admin. Comm. January 31, 1994), approving, Recommended Order of Dismissal, DOAH Case No. 91- 6039GM (DOAH January 13, 1994)(approving interpretation of statute). Further, this statutory language as to dismissal of the proceeding as to the department arguably is at odds with the next sentence, which states that affected persons may challenge the plan or amendment which is the subject of the cumulative notice by filing a petition with the agency as subsection (9) provides. The statutory language does not say, "Any other affected person" may challenge; it says "Any affected person" may challenge, which ending s. 120.57 proceeding. Paragraph (f) also deals with the issue of a cumulative notice that the plan amendment is not in compliance, as follows: If the local government adopts a comprehensive plan amendment pursuant to a compliance agreement and a notice of intent to find the plan amendment not in compliance is issued, the state land planning agency shall forward the notice of intent to the Division of Administrative Hearings, which shall consolidate the proceeding with the pending proceeding and immediately set a date for hearing in the pending s. 120.57 proceeding. It is clear from that statutory language that the cumulative notice proceeding is consolidated with the pending original proceeding if the Department of Community Affairs finds the amendment not in compliance, in contrast to the language used if the Department's cumulative notice is an "in compliance" determination. Finally, paragraph (f) deals with persons who are not parties to the pending original proceeding, as follows: Affected persons who are not a party to the underlying s. 120.57 proceeding may challenge the plan amendment adopted pursuant to the compliance agreement by filing a petition pursuant to subsection (9) or subsection (10). This language seems to do more than provide for persons who are not parties to the underlying proceeding to file subsection (9) or subsection (10) petitions depending upon whether the cumulative notice is an "in compliance" one or a "not in compliance" one, as the case may be. The language also aids in interpreting the previous sentence of the paragraph, "Any affected person may challenge the plan or plan amendment which is the subject of the cumulative notice of intent by filing a petition with the agency as provided in subsection (9)." If that sentence were only intended to apply to affected persons who were not parties to the underlying proceeding, there would be no need for the sentence above-quoted, "Affected persons who are not a party to the underlying s. 120.57 proceeding may challenge the plan amendment adopted pursuant to the compliance agreement by filing a petition pursuant to subsection (9) or subsection (10)." As the state land planning agency and the Agency of final jurisdiction in an "in compliance" proceeding, it is the responsibility of the Department of Community Affairs to interpret the operable statute. Public Employees Relations Commission v. Dade County Police Benevolent Association, 467 So.2d 987 (Fla. 1985.) The Department of Community Affairs interprets the subject provisions of section 163.3184(16), Florida statutes, to mean that, if the Department issues a cumulative notice of "in compliance," the previously existing, original proceeding is extinguished. Thereafter, all affected parties must file petitions challenging the cumulative notice, and the proceeding is governed exclusively by the "fairly debatable" standard and the procedures set out in subsection (9) of section 163.3184, Florida statutes. The particular standard of proof to be applied is based upon the issuance of a notice of intent to find the plan or amendment in compliance or not in compliance. Sheridan v. Lee County, DOAH Case No. 90-7791GM, Final Order No. DCA93-158- FOF-CP (Department of Community Affairs, June 28, 1993). In Department of Community Affairs, et al. v. City of Jacksonville, DOAH Case No. 90-7496GM (January 24, 1994), Final Order No. DCA94-258-FOF-CP (Department of Community Affairs, February 24, 1994), the Department of Community Affairs expressly adopted the interpretation of Hearing Officer J. Lawrence Johnston as set forth in the Recommended Order of Dismissal and Final Order Closing File in the case of Department of Community Affairs v. DeSoto County, DOAH Case No. 91-6039GM (January 19, 1993), approved, Final Order No. AC-94-990 (Fla. Admin. Comm. January 31, 1994), a copy of which is attached hereto as Exhibit B and incorporated by reference. That recommended order at footnote 3 -- recognized that there is contrary dicta in the Recommended Order in Department of Community Affairs, et al. v. Hillsborough County, DOAH Case No. 89-5157GM (December 8, 1992). In the instant case, the Hearing Officer erred in treating the proceeding as one in which both subsections (9) and (10) of section 163.3184, Florida statutes, continued to apply. The burdens of proof -- whether the fairly debatable standard, or the preponderance of the evidence standard -- could be alternatively assigned to a given issue, depending upon whether the issue remained from the original proceeding, or arose as a result of the proceeding brought in response to the cumulative notice. But the statute does not appear to allow the proceeding to be resolved as it was in the instant case, i.e., under both subsections (9) and subsections (10). If that were the case, it would be unclear in a given case as to which entity appropriately should enter the final order, the Administration Commission, or the Department of Community Affairs. Clearly, that does not comport with the objective of the Legislature in specifying the entities with final order authority separately in subsections (9) and (10). Petitioners/Intervenors suggest, in Exception #34, which is dealt with below, that both the Administration Commission and the Department of Community Affairs enter a final order in this. This would result in untenable situations, such as the potential for inconsistent rulings, separate appeals, etc. The Hearing Officer should have treated the proceeding exclusively as one arising as a result of a cumulative notice of "in compliance" governed under the auspices of subsection (9) of section 163.3184, Florida statutes. In that case, the issues should have been those directed to the cumulative notice; thus, Petitioners/Intervenors' complaint in this exception -- that the Hearing Officer should not have limited the issues to those set forth in the July 15, 1993 petition, which was filed as a result of the cumulative notice -- is not well- taken. Further, the standard of proof in a proceeding brought following a cumulative notice of "in compliance" must be the "fairly debatable" standard of section 163.3184(9), Florida Statutes. In this case, however, the Hearing Officer made his various determinations and weighed the evidence with respect either to the fairly debatable standard, or to the preponderance of evidence standard, depending upon the issue. It would be implausible at best, impossible at worst, for the Agency now to attempt to reweigh the selected issues -- those that have been determined using the preponderance of the evidence standard -- under the fairly debatable standard. The Department of Community Affairs, as the Agency entering the Final Order in this cause, is not free to reweigh evidence; that is the prerogative of the Hearing Officer when there are factual issues of ordinary proof. Heifetz v. Department of Business Regulation, 475 So.2d 1277 (Fla. 1st DCA 1985). Moreover, such a reweighing of the issues, even if authorized, would not change the outcome. The issues that were decided under the preponderance of the evidence standard were decided against the Petitioners/Intervenors in this case. The outcome would not change if the fairly debatable standard were applied to those issues. The Agency therefore declines the invitation to apply the fairly debatable standard throughout the proceeding, as it should have been done by the Hearing Officer. Nonetheless, the Agency also must deny Petitioners/Intervenors' Exception #2. PETITIONERS/INTERVENORS EXCEPTION #2 is DENIED. Exception #3. This exception is directed to the Hearing Officer's exclusion of testimony regarding Petitioners/Intervenors' allegations of "urban sprawl." Petitioners/Intervenors assert that a cursory review of the subject petition reveals that "urban sprawl" was properly raised as an issue, even though that precise term was not used. The Hearing Officer heard argument directed to the issue of the "urban sprawl" question (TR Vol. I, pp. 12-18) and determined that it was not within the scope of the petition filed on July 15, 1993 (see Exception #2, above). The Agency has reviewed the subject petition and the portions of the record dealing with argument directed to this issue, and the Agency does not find a sufficient basis for granting the exception. PETITIONERS/INTERVENORS EXCEPTION #3 IS DENIED. Exceptions #4, #5 and #6. The basis for these exceptions is the Hearing Officer's finding of fact, in paragraph 13 of the Recommended Order, that publicly-owned lands in the Garcon Point Project would not be injured by the development of privately- owned lands north of the project. According to the Petitioners/Intervenors, "The evidence introduced at the administrative hearing clearly refutes this finding." Petitioners/Intervenors allude to witness testimony that contradicts the conclusion of the expert who was tendered in general ecology and natural systems, Dr. Joe A. Edmisten [TR Vol. III, pages 78-87] on this point at hearing; it is upon Dr. Edmisten's testimony that the paragraph is supported. The contradictions notwithstanding, however, the paragraph to which these exceptions are directed is supported by competent, substantial evidence in the record, and thus the exceptions must be denied. [Edmisten (TR Vol. III), pages 95-96.] PETITIONERS/INTERVENORS' EXCEPTIONS #4, #5, AND 6 are DENIED. Exception #7. This exception is directed to paragraph 14 of the Recommended Order, in which the Hearing Officer found, "More than 95 percent of Garcon peninsula is jurisdictional wetland for the U.S. Army Corps of Engineers . . . ." According to the Petitioners/Intervenors, no evidence was introduced to support this finding. There is competent, substantial evidence in the record sufficient to support the finding. [Edmisten (TR Vol. III), page 89.] PETITIONERS/INTERVENORS' EXCEPTION #7 is DENIED. Exception #8. In Exception #8, Petitioners/Intervenors take exception to the following finding of fact in paragraph 15 of the Recommended Order, "Little development will occur on the Garcon peninsula . . ." The Petitioners/Intervenors assert that the evidence at the hearing "clearly refutes this finding" and, in support thereof, refer to Future Land Use Map indications of densities of up to four dwelling units per acre and commercial development for Garcon peninsula. The finding is supported by competent, substantial evidence in the record. [Edmisten (TR Vol. III), pages 90-91.] PETITIONERS/INTERVENORS EXCEPTION #8 is DENIED. Exception #9. Petitioners/Intervenors take exception to the findings of fact of paragraph 20 of the Recommended Order, which relates to the condition of the Navarre Beach dune system and the testimony of the expert in coastal geomorphology. The apparent basis for the exception is stated by Petitioners/Intervenors thus, "The fact that the Navarre Beach dune system is still a valuable resource is a compelling reason for implementing a dune protection program which will ensure the system's long-term viability." A finding of fact cannot be overturned on the basis of the argument stated by the Petitioners/Intervenors. Moreover, the findings of fact in paragraph 20 are supported by competent, substantial evidence. [Stone (TR Vol. II), page 155.] PETITIONERS/INTERVENORS' EXCEPTION #9 is DENIED. Exception #10. The Petitioners/Intervenors take exception to paragraph 26 of the Recommended Order wherein the Hearing Officer finds, "The County maintains control over those beach access points shown on the Navarre Beach Future Land Use Map by maintaining them in an unleashed status." The Petitioners/Intervenors state that the evidence clearly refutes the finding, and that the Navarre Beach Future Land Use Map does not identify beach access points. The finding is based upon sufficient competent, substantial evidence of record, and must be sustained. (Miller [TR Vol. I), pages 166-167; Joint Exhibit 1, Plan Objective 11.A.9, and policies 11.A.9.1-9.S, pages 11-6 through 11-7.] PETITIONERS/INTERVENORS' EXCEPTION #10 is DENIED. Exception #11. Petitioners/Intervenors take exception to paragraph 30 wherein the Hearing Officer states that the expert of the Petitioners/Intervenors "did not critique the plan, but said it was laudable." The Petitioners/Intervenors assert in this exception that the evidence clearly refutes this finding in that the expert in question, Dr. Sneed B. Collard, criticized the Santa Rosa County Comprehensive Plan for failing to contain policies and objectives to implement the plan's goal to protect the Pensacola Bay system. The context in which the Hearing Officer made the statement to which exception is taken is important to an understanding of the finding. paragraph 30 of the Recommended Order, in its entirety, reads as follows: Petitioners' expert also admitted that the plan was laudable in terms of the manner in which it seeks to protect the Bay system. While he criticized the plan for not containing clear implementation of its noteworthy goals, he later admitted that if all points of implementation were covered in detail, the plan would become a lengthy and cumbersome document of a more scientific nature. He further admitted to being unaware of the appropriate level of detail for a comprehensive plan and later stated that he did not critique the plan, but said it was laudable. [FF 30; RO page 14.] That having been clarified, the specific statement to which Petitioners/Intervenors take this exception is supported by competent, substantial evidence of record, to wit, the testimony of Dr. Collard, "I didn't critique the Santa Rosa Plan. I said it was laudable." [Collard (TR Vol. I), page 140]. PETITIONERS/INTERVENORS' EXCEPTION #11 is DENIED. Exception #12. The Petitioners/Intervenors take exception to the finding in paragraph 31 of the Recommended Order that finds "that all challenges to the issuance of environmental permits for the bridge have been voluntarily dismissed by the challengers." The Petitioners/Intervenors take this exception based on relevancy. The context of the statement is not clear from the exception. The entirety of paragraph 31 reads as follows: Although petitioners raised the bridge as an issue in these cases, very little evidence was presented concerning the potential impacts of the proposed bridge. It is noted, however, that all challenges to the issuance of environmental permits for the bridge have been voluntarily dismissed by the challengers. It is clear from the context that the information was "noted" and not accorded great weight in the findings. Moreover, the Hearing Officer's inclusion of the information was not erroneous. Thus, there is an insufficient basis to grant the exception. PETITIONERS/INTERVENORS' EXCEPTION #12 is DENIED. Exception #13. Petitioners/Intervenors take exception to the findings of fact contained in paragraphs 37-54 of the Recommended Order, as follows: The Hearing Officer failed to consider or give any ruling with respect to the proposed findings of fact set forth at paragraphs 9-28 and the conclusions of law set forth at paragraphs 96-106 and 111 of Petitioners/Intervenors' proposed Recommended Order. indeed, the Hearing Officer utterly failed to even mention the Wet Prairies and their associated endangered and threatened species. As to the proposed findings of fact included in paragraphs 9-28 of Petitioners/Intervenors' proposed recommended order, the Hearing Officer did so rule, "[paragraphs] 7-34. Partially accepted in findings of fact 10-15 and 37- 54." [RO page 38.] As to paragraphs 96-106 and 111 of Petitioners/Intervenors' proposed recommended order, the Hearing Officer did not make explicit rulings. The subject paragraphs were conclusions of law, which the Hearing Officer is not required to address. In pertinent part, section 120.59(2), Florida Statutes, provides, "If . . a party submitted proposed findings of fact . . . in connection with the proceeding, the order must include a ruling upon each proposed finding . ." It was thus within the sound discretion of the hearing officer to rule only upon the Petitioners/Intervenors' findings of fact. PETITIONERS/INTERVENORS' EXCEPTION #13 is DENIED. Exception #14. Petitioners/Intervenors take exception to the Hearing Officer's finding in paragraph 40 of the Recommended Order that states, "The plan contains extensive provisions designed to implement the Wetlands FLUM (Future Land Use Map) and provide significant protection of wetlands and the natural resource functions of wetlands." The Petitioners/Intervenors assert that no evidence was introduced to support this finding. The finding is based upon competent, substantial evidence, and therefore the exception cannot be granted. [Joint Exhibits 3 and 4, Plan Policies 11.A.4.5 (fig. 7-30); 11.B.3.3; 11.A.1.8.a.b.; 11.A.1.8.c.; 11.A.1.7; 11.A.4.3; 11.B.3.3; 11.A.2.1; 11.B.3.1.; 11.B.3.6; 11.A.1.4; and 11.A.1.8.] PETITIONERS/INTERVENORS' EXCEPTION #14 is DENIED. Exception #15. The basis for this exception is the finding of fact in paragraph 49 of the Recommended Order wherein it is found that the Santa Rosa County Comprehensive Plan "grants only very limited development rights in the Garcon Peninsula region, while also providing significant protections for natural resources in that area." Petitioners/Intervenors assert that the evidence refutes this finding. The finding is based on competent, substantial evidence in the record. [Joint Exhibits 3 and 4.] PETITIONERS/INTERVENORS' EXCEPTION #15 is DENIED. Exception #16 and #17. In Exceptions #16 and #17, Petitioners/Intervenors take exception to paragraph 50 of the Recommended Order. In that paragraph, the Hearing Officer finds that, short of public acquisition, "no other reasonable method by which this area can be comprehensively protected and preserved as an intact ecological unit was presented." The Hearing officer further finds, "Requiring the County to reduce densities to the point where a moratorium on development in the area is created would create inverse condemnation . . Petitioners/Intervenors state that the evidence clearly refutes these findings, that evidence was presented that one dwelling unit per 40 acres was appropriate for the Garcon peninsula, and that designations of up to four units per acre and commercial development would completely destroy the unique ecology of Garcon peninsula. Further, the Petitioners/Intervenors assert that the issue of inverse condemnation was not supported by competent evidence introduced, and that densities of less than four dwelling units per acre can be implemented without creating an "inverse condemnation" situation. As to the reasonableness of the preservation effort, the Agency has reviewed the testimony as to that point, and concludes that the finding is within the allowable inferences from the evidence presented, and within the permissible prerogatives of the Hearing Officer. [Dorman (Vol. III), page 13.] The inverse condemnation finding is rejected as being legally incorrect, but this rejection is irrelevant as to the result because it is cumulative in nature. PETITIONERS/INTERVENORS" EXCEPTIONS #16 and #17 are DENIED. Exception #18. This exception is directed to the finding of fact in paragraph 51 which states that "the great majority of undeveloped areas on the Garcon peninsula currently fall within the wetlands permitting jurisdiction of DEP [Department of Environmental protection] and the federal government. As a consequence, permits for development will be difficult to obtain at best." Petitioners/Intervenors aver that there was no evidence introduced to support this finding. To the contrary, however, the finding is adequately supported by competent, substantial evidence. [Edmisten (Vol. III), pages 90-91.] PETITIONERS/INTERVENORS' EXCEPTION #18 is DENIED. Exception #19. In Exception #19, Petitioners/Intervenors take exception to the finding of fact in paragraph 52 of the Recommended Order, in which it is stated that the Petitioners/Intervenors "failed to prove to the exclusion of fair debate that the plan inappropriately treats wetlands and wildlife habitat on the Garcon peninsula in light of chapter 163 requirements." This is a permissible inference from the evidence presented, both from testimony adduced at hearing, and from the Santa Rosa County Comprehensive Plan itself. PETITIONERS/INTERVENORS' EXCEPTION #19 is DENIED. Exception #20. This exception takes issue with the findings of fact of paragraphs 55-63 of the Recommended Order because the Hearing Officer "failed to consider or give any ruling" on the proposed conclusions of law in the Petitioners/Intervenors' proposed recommended order at paragraphs 142 and 143. The Hearing Officer is not required to do so for the reasons more specifically set forth in disposing of Exception #13, above. PETITIONERS/INTERVENORS' EXCEPTION #20 is DENIED. Exception #21. In Exception #21, Petitioners/Intervenors take exception to the findings of fact of paragraphs 64-70 of the Recommended Order in that the Hearing Officer "failed to consider or give any ruling" on Petitioners/Intervenors' proposed findings of fact at paragraphs 41 and 54-56 of their proposed recommended order, as well as their conclusions of law at paragraphs 112-118 and 121-126 of the same. As to the findings of fact, the Hearing Officer made such rulings, "[paragraphs] 35-56. Partially accepted in findings of fact 16-20 and 64-70." [RO page 38.] As to the conclusions of law, that issue has been addressed above in disposing of Exception #13, as also applied in disposing of Exception #20. PETITIONERS/INTERVENORS' EXCEPTION #21 is DENIED. Exception #22. Petitioners/Intervenors ground this exception on the failure of evidence to support the finding of fact, in paragraph 64 of the Recommended Order, that the Santa Rosa County Comprehensive Plan requires "restoration of preexisting impacts of altered dunes . . The finding is based upon competent, substantial evidence, and therefore the exception must be denied. [Joint Exhibits 3 and 4.] PETITIONERS/INTERVENORS' EXCEPTION #22 is DENIED. Exception #23. Petitioners/Intervenors take exception to the finding of fact in paragraph 69 for the following reasons: The Hearing Officer found that the dune system was protected because the County encourages dune walkovers, sand fences, and other similar methods. The evidence introduced at the administrative hearing clearly refutes this finding. Without a mandatory program of providing such methods to protect the dune system from pedestrian traffic, the plan's alleged protection is illusory. This finding is based upon competent, substantial evidence of record. [Joint Exhibits 3 and 4; Plan Policies 7.A.6.3 and 11.A.1.3.] PETITIONERS/INTERVENORS' EXCEPTION #23 is DENIED. Exception #24. Petitioners/Intervenors base this exception on the finding of fact in paragraph 70 of the Recommended Order wherein the Petitioners/Intervenors assert that the Hearing Officer finds that the Petitioners/Intervenors failed, in the words of the filed exception: "to prove to the exclusion of fair debate, or even by a preponderance of the evidence, that the plan" does not fulfill the Chapter 163 and Rule 9J-5 requirements for protection of the Navarre Beach dune system. The testimony of Dr. Stone clearly refutes this finding. In point of fact, that is not an appropriate paraphrase of the wording of the finding of fact in paragraph 70. The finding of fact, verbatim, is as follows: [P]etitioners have failed to prove to the exclusion of fair debate, or even by a preponderance of the evidence, that the plan does not contain policies which are designed to prevent individual and cumulative impacts of development on beach and dune systems. The finding is a permissible conclusion from the evidence adduced at the hearing, and is based upon competent, substantial evidence. [Joint Exhibits 3 and 4.] PETITIONERS/INTERVENORS' EXCEPTION #24 is DENIED. Exception #25. Petitioners/Intervenors take exception to the findings of paragraphs 74-76 of the Recommended Order based upon the failure of the Hearing Officer to consider or rule on conclusions of law contained in paragraphs 128- 132 of the Petitioners/Intervenor's proposed recommended order. As specified in the disposition of Exception #13, above, and as carried forth in the disposition of Exceptions #20 and #21, above, the exception is denied. PETITIONERS/INTERVENORS, EXCEPTION #25 is DENIED. Exceptions #26, #27, and #28. These exceptions are directed to paragraph 75 of the Recommended Order. The findings of the paragraph that are the basis for the exception include the following: The record does not reflect impacts, if any, the project may have to the environment, but does indicate that adequate mitigation is proposed. The County cannot legally adopt any plan provisions which are inconsistent with a state transportation project. . [P]etitioners have failed to show to the exclusion of fair debate that the plan's treatment of the proposed Santa Rosa Bay Bridge is inappropriate. The findings are supported by competent, substantial evidence. [Edmisten (TR Vol. III); Joint Exhibit 2, Vol. I, pages 4-32 through 4-40.] Exceptions #27 and #28 are simply argument of the Petitioners/Intervenors' position in this proceeding and, as such, are insufficient to overturn findings supported by competent, substantial evidence. PETITIONERS/INTERVENORS' EXCEPTIONS #26, #27, and #28 are DENIED. Exception #29. This exception is directed to paragraphs 77-79 of the Recommended Order, alleged to be in error because the Hearing Officer failed to consider or rule on the conclusions of law in Petitioners/Intervenors' paragraphs 133-140 of their proposed recommended order. As more specifically discussed in disposing of Exception #13, and as concluded in the denials of Exceptions #20, #21, and #25, the Hearing Officer is not required to make such rulings. PETITIONERS/INTERVENORS' EXCEPTION #29 is DENIED. Exceptions #30, #31 and #32. In these exceptions, Petitioners/Intervenors assert that there was no evidence introduced to support the findings, in paragraph 77-79 of the Recommended Order, concerning beach access points. In paragraph 77, Petitioners/Intervenors take exception to the finding that reads, "The plan contains a number of provisions designed to ensure the continued availability of beach access. The future land use map indicates a number of beach access points shown on the map as conservation/recreation." In support of this exception, Petitioners/Intervenors state, "Indeed, during cross examination of Ms. Miller by the County, counsel for the County attacked Ms. Miller for stating that the beach access points were identified on the Navarre Beach Future Land Use Map." In response, Respondent County and Petitioner/Respondent Department state: The Petitioners' own witness, Yvonne Miller, testified that beach access points were indicated on the FLUM. [Citation omitted.] The fact that counsel for the County obtained clarification from Ms. Miller concerning her understanding of how access points were identified on the map is irrelevant to the validity of this finding of fact, and is not a basis for overturning same. As to paragraph 78, Petitioners/Intervenors take exception to the finding that reads that "petitioners have failed to prove to the exclusion of fair debate, or even by a preponderance of the evidence, that the plan does not include appropriate objectives and policies concerning public access to the beach." In response, Respondent County and Petitioner/Respondent Department state, "The plan support documents include extensive data and analysis concerning public access to beaches." With respect to paragraph 79, Petitioners/Intervenors take exception to the finding that the Future Land Use Map includes many public access points. The Agency has reviewed the testimony adduced at hearing regarding beach access points [Miller (TR Vol. 1), pages 150- 169]. The Hearing Officer's conclusions drawn from the testimonial evidence are within the allowable range of inferences. Based upon the record testimony, the findings of fact in paragraphs 77-79 to which exceptions are taken is based upon competent, substantial evidence in the record. [Miller (TR Vol. 1), pages 150-169; Joint Exhibit 2, Vol. II, pages 7-17 through 7-19; Joint Exhibit 7.] PETITIONERS/INTERVENORS' EXCEPTIONS #30, #31, and #32 are DENIED. EXCEPTIONS TO CONCLUSIONS OF LAW Exception #33. Petitioners/Intervenors take exception to the conclusion of law in paragraph 87 of the Recommended Order wherein the Hearing Officer concluded that the petitions challenging the plan must fail. Petitioners/Intervenors assert that they have met their burden of proof, and their petition must be granted. The Hearing Officer found that the Petitioners/Intervenors failed to meet their burden of proof. The conclusion of law ultimately was based upon the Hearing Officer's findings of fact in this case. Factual issues susceptible of ordinary methods of proof are the prerogative of the hearing officer. Heifetz v. Department 6f Business Regulation, 475 So.2d 1277 (Fla. 1st DCA 1985). It is for the hearing officer to consider the evidence presented, resolve conflicts, judge credibility of witness, draw permissible inferences from the evidence, and reach ultimate findings of fact based on competent, substantial evidence. Id., 475 So.2d at 1281. In this case, the Hearing Officer did so, and his findings of fact did not support the position of the Petitioners/Intervenors. The conclusion of law was the logical result of the Hearing Officer's permissible rulings on the findings of fact. PETITIONERS/INTERVENORS' EXCEPTION #33 is DENIED. Exception #34. Petitioners/Intervenors take exception to the conclusion of law in paragraph 90 of the Recommended Order wherein the Hearing Officer recommends that the Department of Community Affairs enter the final order in this cause, finding the Santa Rosa County Comprehensive Plan in compliance. Petitioners/Intervenors assert that both the Department of Community Affairs and the Administration Commission should enter a final order finding the plan to be not in compliance. For the reasons set out in disposing of Petitioners/Intervenors' Exceptions #1 and #2, above, the Administration Commission is not the entity to whom the Recommended Order in this cause should be directed. The Department of Community Affairs is the appropriate Agency to enter the final order in this cause. As to the issue of compliance, the Department found the plan, as amended, to be in compliance; the Hearing Officer heard evidence and considered the issues, and found the plan, as amended, to be in compliance. The conclusion is the logical and ultimate result of the findings of fact in this case, which were based upon competent, substantial evidence. The Petitioners/Intervenors have not borne their burden of proving that the plan, as amended by remedial amendments, is not in compliance. PETITIONERS/INTERVENORS' EXCEPTION #34 is DENIED. WHEREFORE, the Department of Community Affairs adopts the Recommended Order of the Hearing Officer, and issues this Final Order determining that the Santa Rosa County Comprehensive Plan, as amended, is in compliance.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Department of Community Affairs enter a final order determining the Santa Rosa County comprehensive plan, as amended, to be in compliance. DONE AND ENTERED this 12th day of July, 1994, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of July, 1994. Petitioners: APPENDIX TO RECOMMENDED ORDER CASE NOS. 90-7706GM AND 93-4980GM 1-3. Partially accepted in finding of fact 2. 4. Covered in preliminary statement. 5-6. Partially accepted in finding of fact 1. 7-34. Partially accepted in findings of fact 10-15 and 37-54. Partially accepted in finding of fact 9. 36-56. Partially accepted in findings of fact 16-20 and 64-70. 57-65. Partially accepted in findings of fact 31-36 and 74-76. 66-77. Partially accepted in findings of fact 24-26 and 77-79. 78-83. Partially accepted in findings of fact 27-30 and 55-63. Note - Where a proposed finding has been partially accepted, the remainder has been rejected as being irrelevant, not supported by the more credible, persuasive evidence, subordinate, or unnecessary to the resolution of the issues. Respondents: Because respondents' joint proposed order exceeded the forty page limit imposed by Rule 60Q-2.031, Florida Administrative Code, the undersigned has considered the contents of the proposed order but has not made specific rulings on each proposed finding. See Sunrise Community, Inc. v. DHRS, 14 F.A.L.R. 5162 (DHRS, 1992), affirmed 619 So.2d 30 (Fla. 3rd DCA 1993). COPIES FURNISHED: Linda Loomis Shelly, Secretary Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Dan R. Stengle, Esquire 2740 Centerview Drive Tallahassee, Florida 32399-2100 Stephanie M. Callahan, Esquire 2740 Centerview Drive Tallahassee, FL 32399-2100 Thomas V. Dannheisser, Esquire County Attorney Santa Rosa County Courthouse Room 106 Milton, FL 32570 Kenneth G. Oertel, Esquire Post Office Box 6507 Tallahassee, FL 32314-6507 David A. Theriaque, Esquire Building F, Suite 100 820 East Park Avenue Tallahassee, FL 32301 Mr. Robert Carl 9277 Deer Lane Navarre, FL 32566 John M. Harold, Esquire J. Dan Gilmore, Esquire 4400 Bayou Boulevard, Suite 45 Pensacola, FL 32503
The Issue The issue before the Florida Land and Water Adjudicatory Commission (FLWAC) in this proceeding is whether to grant the Petition to Establish the Pioneer Community Development District (Petition). The local public hearing was for purposes of gathering information in anticipation of quasi-legislative rulemaking by FLWAC.2
The Issue The issue before the Florida Land and Water Adjudicatory Commission (FLWAC) in this proceeding is whether to grant the Amended Petition to Establish the Palm Coast Park Community Development District (Amended Petition) dated October 13, 2004. The local public hearing was conducted for the purpose of gathering information in anticipation of rulemaking by FLWAC.
The Issue At issue in this proceeding is whether Respondents Daniel and Donna Grace; Joseph and Linda Oftell; Paul and Debra Linger; Ann Pastore; Thompson and Dana Fillmer; Joseph and Dottie Scruggs; Stephen Frey; and Lindsey Bramlitt and Jacqueline Porter, Trustees of the Land Trust dated May 1, 2005 (collectively referenced herein as "Applicants") qualify for an exemption from the requirements of coastal construction control line ("CCCL") permitting pursuant to section 161.053(11)(b), Florida Statutes, for their proposed activities in regard to a dune walkover structure seaward of the CCCL at the end of Milliken Lane in St. Johns County, as provided in the Amended Exemption Determination issued by the Department of Environmental Protection ("Department") on September 8, 2011.
Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of the proceeding, the following findings of fact are made: The proposed project site is located at the seaward end of Milliken Lane, in the development known as "Milliken's Replat," in Crescent Beach, Florida. The development consists of 10 lots between State Road A1A and the Atlantic Ocean. The privately maintained Milliken Lane runs west to east, perpendicular to A1A. Milliken Lane bisects the 10 lots, i.e., five lots are on each side of the lane. Lots 1 through 5 are on the north side of Milliken Lane, and Lots 6 through 10 are on the south side. Lots 5 and 6 are the largest lots and are the lots nearest the ocean. Petitioner Anastasia, Inc., owns Lot 5 and Petitioner Amanda Pope owns Lot 6. The sole officer and shareholder of Anastasia, Inc., is Kenneth Pfrengle. The remaining eight lots are owned by Applicants, as follows: Steven Frey owns Lot 1; Daniel and Donna Grace own Lot 2; Paul and Debra Linger own Lot 3; Ann Pastore owns Lot 4; Lindsey Bramlitt and Jacqueline Porter, Trustees of the Land Trust dated May 1, 2005, own Lot 7; Joseph and Linda Noftell own Lot 8; Joseph and Dottie Scruggs own Lot 9; and Thompson and Dana Filmer own Lot 10. Milliken's Replat was duly recorded on October 11, 1983, in the Public Records of St. Johns County, Florida, Map Book 15, Page 100. The Milliken's Replat graphic representation of the development shows a line between Lots 5 and 6 and indicates that it is a "6' WIDTH WALKWAY FOR WALKWAY TO BEACH." The indicated walkway begins at the end of Milliken Lane and extends at least to the CCCL.2/ The walkway straddles Lots 5 and 6, the two lots owned by Petitioners. Milliken's Replat is also subject to a Road Maintenance Agreement recorded by the original developers on January 28, 1994, in the Public Records of St. Johns County, O.R. 1034, Page 1596. The Road Maintenance Agreement provides for the continuing maintenance of Milliken Lane and "That certain six foot wide walkway reflected on the plat running between the cul-de-sac at the end of Milliken Lane to the Atlantic Ocean, including existing dunes walk-over structure." The Road Maintenance Agreement goes on to provide as follows, in relevant part: Such road and walkway shall be maintained by the parties to this agreement, their heirs, successors and assigns in a condition so as to make it free and passable in perpetuity. The costs of the maintenance of said road and walkway shall be shared to the end that each lot owner shall pay one-tenth of the cost associated with maintenance costs. Owners of multiple lots shall be responsible for one-tenth of the cost for each lot owned. * * * 5. In the event that sixty percent of the lot owners determine that maintenance work is necessary and contract to complete same, they shall have the right to maintain a lien against any lot owner who refuses to pay the assessment pursuant to the provisions of this agreement. Unless waived, each lot owner shall be given a minimum of ten (10) days' written notice of the proposed meeting to determine assessments.... Petitioners purchased their respective lots subject to the terms of Milliken's Replat and the Road Maintenance Agreement. On March 11, 2011, Applicant Dan Grace sent a notice to the "Property Owners of Milliken Lane" stating that a meeting to discuss the maintenance of Milliken Lane would take place on March 24, 2011, pursuant to paragraph 5 of the Road Maintenance Agreement. The notice went on to state that the walkover "is in need of maintenance to maintain and preserve the integrity of the existing walkover," and that a proposal for the cost of repair would be presented at the meeting. Finally, the notice stated that a vote on the proposal would be taken at the meeting. Mr. Grace contacted Rick Powell, owner of Barefoot Marine Construction, to provide a quote for the repair and maintenance of the dune walkover. Mr. Powell visited the site, took measurements, and provided a quote to Mr. Grace prior to the March 24, 2011, meeting. On March 22, 2011, Daniel Mowrey, counsel for Applicants, had a telephone conversation with West Gregory, an attorney in the Department's office of general counsel, regarding the proposed repair and maintenance to the dune walkover. The next day, Mr. Mowrey followed up with a letter to Mr. Gregory that included copies of Milliken's Replat and the Road Maintenance Agreement. The Applicants' chief concern was Mr. Pfrengle's contention that the repair of the walkover was subject to his consent as the owner of the property on which the walkover sits. Mr. Mowrey stated his clients' position as follows: I believe the Department has taken the position this matter has to do with Title and/or Ownership to the property whereon easement lies. This matter is clearly not about ownership. The fact the easement lays on the property of Mr. Pfrengle and Amanda Pope is not a matter of contention. There is no authority I can find that forces the Department to obtain permission from Mr. Pfrengle or Ms. Pope to issue this permit. The Road Maintenance Agreement controls and is clear as to the rights of all owners in the Milliken Replat. Denial of a permit from the Department to maintain, repair and/or replace the existing walkover is unreasonable. All members of the Milliken Replat have sufficient title interest through the easement and Road Maintenance Agreement to make application based on recorded rights. It appears the Department has made the interpretation of title interest as meaning right of possession. This is clearly flawed. I am fully aware that this matter may end up in Circuit Court to resolve this dispute. I want to be clear in my representation of my clients. If the Department is going to deny this request for a permit, I would like to know the legal justification for doing so. The recorded documents are clear and speak for themselves. While Mr. Pfrengle may not want the walkover replaced, he agreed to the provisions of the easement and Road Maintenance Agreement when he purchased his home as shown on the recorded instruments. If my clients are required to fill out a formal written request for a permit, please notify me and provide the proper documentation for that request. . . . The owners' meeting was held on March 24, 2011, pursuant to the March 11 notice. All of the Applicants voted in favor of the repairs and maintenance to the dune walkover,3/ making an eighty percent majority for the work to proceed. Petitioners did not attend the meeting. Also on March 24, 2011, Mr. Gregory sent an email to Mr. Mowrey that read as follows, in relevant part: After discussing this matter with the Department's permit processor and Mr. Mowrey, it appears your proposed activity may be eligible for an exemption. If you would like to pursue an exemption determination, please send a letter requesting the exemption to the Bureau. The items to include in the request are listed in 62B-33.008(11). . . . Late on the afternoon of March 24, 2011, Mr. Mowrey on behalf of his clients emailed a written request for an exemption from the CCCL permit requirements to David Kriger, permit manager for the Bureau. On March 30, 2011, the Department issued the Exemption Notice quoted in the Preliminary Statement, supra. On April 14, 2011, Rick Powell of Barefoot Marine Construction provided a verbal description of the walkover project to Fritz Wettstein, environmental manager of the CCCL program. The project plans included the use of "sister" posts directly abutting and fastened to the existing posts to support the repaired structure. Robert Morgan, a licensed professional engineer whose company worked on the project for Barefoot Marine, testified that the timber in the existing walkover was old, possibly warped, and did not provide a pure nailing surface. However, the impact on the dune topography of pulling out the old posts for replacement would have been "tremendous." "Sistering" the new posts to the old ones would provide the needed support while minimizing environmental impact. On April 23, 2011, Mr. Morgan's company, RGM Engineering, Inc., provided the Applicants with two sets of structural drawings/engineering plans for the dune walkover, one of which was accepted and ultimately built. The plan that was built was designed and measured to be an exact duplicate of the existing walkover in all dimensions. The second plan would have lowered the rebuilt walkway, making it less visually obtrusive to Mr. Pfrengle and Ms. Pope. On September 8, 2011, the Department issued the Amended Exemption Determination quoted in the Preliminary Statement, supra. Based on Mr. Powell's project description, the Department determined that the project was exempt pursuant to section 161.053(11)(b), Florida Statutes. On September 16, 2011, Bureau field inspector Trey Hatch conducted a site inspection of the proposed construction area and beach dune system. Mr. Hatch's written inspection report stated that the existing walkover, "located within a 6' easement area used by local neighborhood," appeared to be in need of repair or replacement due to the age of the wood and support hardware. Mr. Powell testified that his company waited 21 days after the issuance of the Amended Exemption Determination before commencing work on the walkover. Mr. Powell's company performed all the work. The digging of postholes was done by hand, without the use of machines. Only two workers were on the ground at a time, and only those materials immediately required were carried to the walkover. Materials were passed up and down to the workers on the structure to minimize disturbance to the dune system. Mr. Morgan testified that the new posts were placed about five feet into the ground, to the depth of the old posts. Nearly every old post was sistered to a new post, and most of the walkover's structure was replaced. Mr. Morgan stated that the repaired walkway had a slightly larger east-west footprint due to the sistered posts, but that the north-south footprint was exactly the same as that of the old walkover. As noted above, the Department's Amended Exemption Determination found the Applicants' project exempt pursuant to section 161.053(11)(b), which provides: Activities seaward of the coastal construction control line which are determined by the department not to cause a measurable interference with the natural functioning of the coastal system are exempt from the requirements of subsection (4).4 Florida Administrative Code Rule 62B-33.008 implements section 161.053. Subsection (11) of the rule provides specificity to the exemption provided by section 161.053(11)(b) as follows: Requests for the Department to determine that the proposed activity is exempt from permitting pursuant to the provisions of Section 161.053(11)(b), F.S., shall include, at a minimum, a survey meeting the requirements of Rule 62B-33.0081, F.A.C., and the information requirements of paragraphs 62B-33.008(3)(l), (m), (n), (p), (r), and subsection 62B-33.008(5), F.A.C. The Department recognizes that the requirements specified above may not be necessary to make an exemption determination. In such cases, the applicant shall, as part of the request for exemption, identify those requirements and state the reason why they are inapplicable. The Department shall waive requirements that do not apply. The "information requirements" of rule 62B-33.008 referenced in the quoted portion of the rule are as follows, in relevant part: (3) Any person desiring to obtain a permit for construction seaward of the coastal construction control line (CCCL) or 50-foot setback from the Department. . . shall submit two (2) copies of a completed application form to the Bureau . . . The application shall contain the following specific information: * * * Two copies of a dimensioned site plan. The drawings shall be signed and sealed by an architect, engineer, landscape architect, or professional surveyor and mapper (as appropriate) licensed in the state of Florida. The site plan shall include: The locations and exterior dimensions of all proposed structures, including foundations and other activities, and the bearings and distances from the CCCL or 50- foot setback to the seaward corners of the foundations of any major structures or the seaward limit of any coastal or shore- protection structure. Dimensions and locations of the foundation outlines of any existing structures on adjacent properties and distances from the CCCL or 50-foot setback to the seaward corners of the foundations of any existing structures or the seaward limit of any coastal or shore-protection structure. These measurements shall include all structures that the applicant contends have established a reasonably continuous and uniform construction line for permits requested under the provisions of sections 161.052(2)(b) or 161.053(5)(b), F.S. Dimensions and locations of the foundation outlines of any existing structures on the subject property and distances from the CCCL or 50-foot setback to the seaward corners of the foundations of any major structures or the seaward limit of any coastal or shore-protection structure. The horizontal location of the erosion control line (if one exists), any contour lines corresponding to elevation 0.00, the approximate contour of mean high water and the seasonal high water, and the horizontal location of the seaward line of vegetation and outlines of existing natural vegetation. The horizontal location of the CCCL or the 50-foot setback (if no CCCL is established for the county in which the property is located) for the full width of the subject property, including the location and full stamping of the two nearest Department or published second order or higher horizontal control points. The location and dimensions of the property boundary, rights of way, and easements, if any. The property owner and project name, street address, scale, north arrow, sheet number, and date of drawings. The location of work limits, construction fences, and dune features and vegetation to be protected during construction. Two copies of a dimensioned grading plan. The drawings shall be signed and sealed by an architect, engineer, landscape architect, or professional surveyor and mapper (as appropriate) licensed in the State of Florida. The grading plan shall include: Existing and proposed elevations, contours and spot elevations. For any proposed excavation or fill: A table of all permanent, temporary, and net excavation and fill volumes seaward of the CCCL; The storage locations and description of handling methods for all temporary excavation and fill material; and Soil and geotechnical data for beach compatible imported or excavated material proposed for placement on the beach seaward of a frontal dune or on the sandy beach. Two copies of dimensioned cross- sections. The drawings shall be signed and sealed by an architect, engineer, landscape architect, or professional surveyor and mapper (as appropriate) licensed in the State of Florida. The cross-sections shall include a typical view from the mean high water line to the CCCL depicting all structures and building elevations, proposed and existing grades, subgrade construction, excavation, fill, and elevations for any proposed or existing rigid coastal structures. * * * (p) Details, including engineering design computations, for any proposed waste or storm water discharge onto, over, under, or across the beach and dune system, such as storm water runoff, swimming pool drainage, well discharge, domestic waste systems, or outfalls. . . (r) Two copies of detailed planting plans, including the location of proposed plants, existing native vegetation, and plants to be removed. Plans shall include a plant list with both scientific and common names. * * * (5) The staff shall require the applicant to provide other site specific information or calculations as is necessary for proper evaluation of the application. The dimensions for the plans referenced in this section shall be submitted in U.S. Customary System units. Structures shall be located with distances measured perpendicular to the control line, 50-foot setback line, or the mean high water line, as appropriate. All elevations in this rule shall be referenced to NAVD 88 (U.S. survey foot). Site, grading, drainage, and landscape plans as well as cross-sections shall be drawn to a scale no smaller than 1'' = 40' in the horizontal dimension. Mr. Morgan testified that a survey was not required for this project because the plan was simply to replace an existing walkover that was already on the ground. The existing footprint would be maintained during construction. Mr. Morgan testified that because the project was being undertaken within the confines of an existing structure, there was also no need for a dimensioned site plan or a dimensioned grading plan. Mr. Morgan testified that it was necessary to provide dimensioned cross-sections to ensure that the renovated walkover conformed exactly to the dimensions of the existing walkover. Those cross-sections were provided to the Department. Mr. Morgan testified that it was not necessary to provide details, including engineering design computations, for any proposed waste or storm water discharge onto or over the beach and dune system because no impervious surface was being added. Mr. Morgan testified that it was not necessary to submit planting plans because the dunes were not being disturbed. Mr. Morgan testified that no other site-specific information or calculations were necessary for the exemption application "because it was all straightforward. There again, it's an existing structure." Tony McNeal, the administrator of the CCCL program, testified as an expert in coastal engineering. Mr. McNeal also addressed the criteria for obtaining an exemption pursuant to rule 62B-33.008(11), and concluded that none of the items listed in subsection (11) were necessary for the Department to determine that the project would not cause a measureable interference with the natural functioning of the coastal system. Petitioners offered no evidence that the requirements of rule 62B-33.0081, paragraphs 62B-33.008(3)(l), (m), (n), (p), (r), or subsection 62B-33.008(5) were necessary to make an exemption determination pursuant to section 161.053(11)(b). The evidence demonstrated that the Applicants identified which of those requirements were inapplicable and why, and that the Department waived the inapplicable requirements. The unchallenged testimony of Mr. Morgan and Mr. McNeal established that the proposed project would not cause a measurable interference with the natural functioning of the coastal system, and that the criteria for the grant of an exemption from the CCCL permitting requirements were met in this instance. However, the finding that the proposed project would meet the exemption criteria of section 161.053(11)(b) does not end the inquiry. Petitioners contend that Applicants' project is simply not the kind of project to which the section 161.053(11)(b) exemption provision is intended to apply. Rather, this project was of the type contemplated by section 161.053(11)(a), which provides in relevant part: The coastal construction control requirements defined in subsection (1) and the requirements of the erosion projections in subsection (5) do not apply to any modification, maintenance, or repair of any existing structure within the limits of the existing foundation which does not require, involve, or include any additions to, or repair or modification of, the existing foundation of that structure.... Petitioners contend that because it included "additions to, or repair or modification of" the walkover foundation, the project should have been required to seek a CCCL permit. Petitioners argue that the project as a whole constituted a replacement of the existing walkover, not merely repairs and maintenance. As such, it was not the type of activity that the Department should have considered for exemption under section 161.053(11)(b). Petitioners offered documentation from the Department's files indicating that no beach walkovers have been granted exemptions from the need to obtain at least a field permit.5/ Trey Hatch, a senior field inspector for the Bureau, testified that he has never issued an exemption for a dune walkover. He stated that he issues "quite a few" field permits for walkover structures. These include permits for new walkovers, additions, and repair and rebuilding. Mr. Hatch stated that aboveground repairs to walkovers typically do not require permits. He testified that he has issued field permits for such repairs in order to assist homeowners in obtaining building permits from local authorities. However, foundation modification such as digging holes, replacing posts or modifying the structure outside its existing dimensions would require a permit. Mr. McNeal testified that the Department regularly issues permits for dune walkovers and has issued more than a thousand such permits over the years. To his knowledge, the Department has never granted an exemption under section 161.053(11)(b) for a walkover structure prior to the instant case. Despite this lack of precedent, Mr. McNeal, who has been the administrator in charge of the CCCL program since 1998, expressed confidence that a permit was not required for this project because the proposed activity would not cause a measurable interference with the natural functioning of the coastal system. Petitioners contend that the walkover was not "repaired" nor was it the subject of "maintenance." They assert that the walkover was replaced from the foundation up, and that such replacement makes the Applicants' project ineligible for exemption. Petitioners state that digging and setting of new posts constituted modification of the foundation that required a permit under section 161.053(11)(a). The Department replies that the exemption was not granted pursuant to section 161.053(11)(a) but under the standard set forth in section 161.053(11)(b). Therefore, Petitioners contentions regarding the repair or replacement of the walkover's foundation are irrelevant. In similar fashion, the Department dismisses Petitioner's contention that the sistered posts violated Florida Administrative Code rule 62B-34.050(19)(b), which provides: Elevated walkovers that provide access to the beach shall meet the following design criteria: * * * (b) The piles for the walkover structure shall not be greater that [sic] four by four inch posts and shall not be encased in concrete. Petitioners point out that by sistering the new four- by-four posts to the existing four-by-four posts, Applicants have created piles for the walkover structure that are now four inches by eight inches, in excess of the maximum allowed by the quoted rule. However, the Department points out that the quoted rule sets forth the conditions for general permits for activities seaward of the CCCL, in particular for a new dune walkover structure. As such, the rule is irrelevant to a consideration of whether the repairs to the already existing walkover meet the specific criteria for an exemption pursuant to section 161.053(11)(b) and rule 62B-33.008(11). Petitioners argue that a form of estoppel should apply to the Department's grant of an exemption in this case because of prior Department actions regarding the same walkover. In 2005, one of the Applicants in the instant case, Paul Linger, obtained a field permit to repair the stairs on the walkover and to install a cantilevered bench seat. Controversy ensued when both Ms. Pope and Mr. Pfrengle objected and insisted on removal of the bench seat. The Department ultimately decided that Mr. Linger had installed the bench seat farther seaward than the permit allowed, and that the seat extended beyond the easement onto Ms. Pope's property. Ms. Pope also raised the question whether Mr. Linger had the authority to obtain the permit without her permission. Jim Martinello, an environmental manager with the Bureau, wrote as follows in a letter to Timothy J. Perry, counsel for Ms. Pope, in a letter dated March 25, 2008: In Mr. Perry's letter dated March 17, 2008, he has advised Department staff that his client, Amanda Pope, would be amenable to remove the cantilevered seating area from her property. Pursuant to section 161.053(12)(c)(6), Florida Statutes,6/ the removal of any existing structures or debris from the upland, provided there is no excavation or disturbance to the existing topography or beach/dune vegetation is exempt from the Department's permitting requirements. The installation of the handrail would also be considered an exempt activity; however, be advised that if Ms. Pope proposes to install a wooden post into the ground, then the activity would no longer be exempt and a Department permit would be required. If, after removal of the cantilevered seating area and placement of the handrail, no additional compliance issues are identified by staff, the file on this matter will be closed. Since the subject dune walkover is within an easement, any future reconstruction or repairs to the subject dune walkover must be authorized with an administrative Coastal Construction Control Line permit. A Department field permit will not be available for any future proposed activities regarding the subject structure. (emphasis added). In a follow-up letter dated June 19, 2008, noting that the bench seat had been removed and the Department's file on the matter had been closed, Mr. Martinello reiterated: As previously stated, since the subject dune walkover is within an easement, any future reconstruction or repairs to the subject dune walkover must be authorized with an administrative Coastal Construction Control Line permit. A Department field permit will not be available for any future proposed activities regarding the subject structure. With reason, Petitioners question why the Department's representative cautioned Ms. Pope that the installation of a single wooden post would trigger the need to obtain a permit from the Department, but three years later the Department determined that the installation of more than 30 posts on the same walkover was exempt from permitting. The letters clearly state that any future reconstruction or repairs to this dune walkover would require an administrative CCCL permit rather than a mere field permit. However, three years later, no permit whatever was required for an extensive renovation of the same walkover. At the hearing, Mr. Marintello testified that the intent of his language regarding the need for a permit was "informational." He wanted to advise the parties that they could not obtain a field permit for reconstruction because the walkover was within an easement. Mr. Martinello stated that the Department had previously decided that it would be better to use the administrative CCCL permitting process where an easement was involved. The greater scrutiny of that process would insure that the applicant is eligible to obtain the permit. Mr. Martinello stated that he defers to the opinion of Mr. McNeal and the Bureau permitting staff as to whether an activity qualifies for an exemption. He testified that he had no intent for his letter to preclude anyone from ever obtaining an exemption to perform work on the walkover, and that in any event he lacked the authority to make such a conclusive pronouncement. The Department and Applicants strenuously argued that any evidence not strictly addressing the criteria for exemption under section 161.053(11)(b) is irrelevant to this proceeding. In so arguing, they seek to avoid the threshold question of whether section 161.053(11)(b) is the applicable provision for repair or replacement of an existing structure such as a dune walkover. The testimony and the statute itself lead to the finding that the specific provisions of section 161.053(11)(a), not the general exemption language of section 161.053(11)(b), should have been applied to the "modification, maintenance, or repair" of this existing structure. When Mr. Morgan testified to justify the lack of need for various items listed in rule 62B-33.008(11), he did so in terms of section 161.053(11)(a): it was unnecessary to provide a ground survey, dimensioned site plan, dimensioned grading plan, or other site specific information or calculations because the project was staying within the confines of the existing structure. The Department's own personnel made it clear that their long practice has been to apply section 161.053(11)(a) to alterations of dune walkovers. Mr. Hatch testified that he has never issued an exemption for a dune walkover, and that his common practice is to issue field permits for dune walkovers. In his experience, aboveground repairs to walkovers are exempt and foundation modifications require a permit. Mr. Hatch was obviously referencing section 161.053(11)(a) in stating these criteria. Mr. Martinello's letters cautioning Ms. Pope not to install a wooden post in the ground were plainly premised on the section 161.053(11)(a) limitation on changes to the foundation. Mr. Martinello's testimony regarding his intent in writing the letters was an unconvincing attempt to revise his views to reflect the Department's new interpretation of the statute. The Department's own expert, the head of its CCCL permitting program, Mr. McNeal, conceded the novelty of granting a section 161.053(11)(b) exemption for a dune walkover. He could point to over one thousand walkover permits but not a single walkover exemption during his long tenure at the Bureau. In summary, the Department misapplied the general exemption criteria in section 161.053(11)(b) to a situation that met the more specific criteria of section 161.053(11)(a). Applicants should have been required to obtain either a permit pursuant to section 161.053(11)(a) or a Department determination that such a permit is not required because of the nature of the work performed on the walkover. Finally, Petitioners raised the issue of whether Applicants had the authority to obtain an exemption from the Department. Petitioners contended that neither Millken's Replat nor the Road Maintenance Agreement authorized Applicants to effect repairs on the walkover without express permission of the property owners, Ms. Pope and Anastasia, Inc. The Department argued that it has no obligation to investigate ownership rights prior to issuing an exemption. Based on the foregoing finding that the exemption was improvidently granted, there is no need to address this issue at this time.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED that the Department of Environmental Protection enter a final order denying the application of Daniel and Donna Grace; Joseph and Linda Oftell; Paul and Debra Linger; Ann Pastore; Thompson and Dana Fillmer; Joseph and Dottie Scruggs; Stephen Frey; and Lindsey Bramlitt and Jacqueline Porter, Trustees of the Land Trust dated May 1, 2005, for an exemption from the requirements of coastal construction control line ("CCCL") permitting pursuant to section 161.053(11)(b), Florida Statutes, for their proposed activities on a dune walkover structure seaward of the coastal construction control line at the end of Milliken Lane in St. Johns County. DONE AND ENTERED this 5th day of October, 2012, in Tallahassee, Leon County, Florida. S LAWRENCE P. STEVENSON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 5th day of October, 2012.
The Issue The issue to be determined in this case is whether Respondent Steven Hanson is entitled to a coastal construction control line ("CCCL") permit to construct a single-family residence and associated structures seaward of the CCCL on Anna Maria Island, Manatee County, Florida.
Findings Of Fact The Parties Respondent Hanson owns an undeveloped lot located at 107 Elm Avenue in Anna Maria, Florida ("the project site"), upon which he proposes to construct a residence and related structures that are authorized by the CCCL permit challenged by Petitioners. Petitioners Ronnie E. and Pamela Young own a single- family residence at 110 Pine Avenue in Anna Maria. The Young property is about 60 feet landward of the project site. Blanton Homestead, LLC, owns a single-family residence at 109 Elm Avenue in Anna Maria, which is contiguous to the Hanson Property. Blanton entered into a settlement agreement with Hanson and withdrew its petition and opposition to the CCCL permit. The Department is the agency responsible for regulating construction activities seaward of the CCCL pursuant to Part I of Chapter 161, Florida Statutes, and Florida Administrative Code Rule 62B-33. The Project Site The project site is seaward of the CCCL established in accordance with Section 161.053, Florida Statutes. The shoreline in this area has experienced relatively large fluctuations. It is included in the State's Strategic Beach Management Plan, which means that it has been prioritized for beach restoration. This area was included in a 2002 beach nourishment project. In the eight years since the nourishment, the project has "performed" well and the shoreline in front of the project site has accreted since the completion of the nourishment project. The shoreline is now 331 feet more seaward than its position in 1998. A permit was issued in July 2010 for a renourishment project in this area. The project site is approximately 350 feet landward of the mean high water line of the Gulf of Mexico. The project site is densely vegetated and includes sea grapes and sea oats. One or two active gopher tortoise burrows may exist on the project site. On each side of the project site are platted road rights-of-way that run perpendicular to the shoreline. On the northwest side of the project site is Elm Avenue, a 50-foot-wide public asphalt street, at the seaward end of which is a wooden walkway to the beach. On the southeast side of the project site is a ten-foot-wide platted alley. Adjacent to the project site on the southeast is the Brown property and residence, which was the subject of a CCCL permit issued in 2005. Continuing southeast from the Brown property is Pine Avenue. Dunes in the Area Florida Administrative Code Rule 62B-33.002(17) defines "dune" as "a mound, bluff or ridge of loose sediment, usually sand-sized sediment, lying upland of the beach and deposited by natural or artificial mechanism, which may be bare or covered with vegetation and is subject to fluctuations in configuration and location." A "frontal dune" is defined as "the first natural or man-made mound or bluff of sand which is located landward of the beach and which has sufficient vegetation, height, continuity and configuration to offer protective value." See § 161.053(6)(a)1., Fla. Stat. (2009).2/ "Protective value" is defined as "the measurable protective level" afforded by the dune system to upland property and structures from erosion and storm surge. See Fla. Admin. Code R. 62B-33.002(50). A "significant dune" is defined as having "sufficient height and configuration or vegetation to offer protective value." See Fla. Admin. Code R. 62B-33.002(17)(a). A "primary dune" is defined as "a significant dune which has sufficient alongshore continuity to offer protective value to upland property." See Fla. Admin. Code R. 62B- 33.002(17)(b). A primary dune may be the frontal dune if it is located immediately landward of the beach. Id. The parties disputed the proper classification of the dunes in the area of the proposed project. Their dispute is not surprising because all three types of dunes are defined as offering protective value to upland property. To state, for example, that a primary dune is a significant dune (one that offers protective value) with sufficient alongshore continuity to offer protective value, sounds circular. It is apparently the practice of the Department to treat the term "continuity" in the definitions of "frontal dune" and "primary dune" as a paramount factor. The Department does not consider a dune to qualify as a frontal dune or a primary dune unless it offers a high degree of protection because of its continuity. The most seaward dune from the project site was described by Tony McNeal, administrator of the Department's CCCL program, as a "dune system," consisting of scattered, vegetated mounds with peak elevations of about 7 feet.3/ This dune system spans the entire width of the project site and is about 180 feet wide. In recent years, the mounds have grown in size and the amount of vegetation on the mounds has increased. These mounds offer some protective value and, therefore, qualify as significant dunes. Hanson's coastal engineer, Michael Walther, believes the mounds qualify as a frontal dune, but he conceded that they would only provide protection for relatively high-frequency (e.g., 10-year) storm events. The public's pedestrian access from Elm Avenue and Pine Avenue has resulted in wide, denuded, and flattened paths through the dune system to the shoreline. Because the mounds do not create a continuous dune, but have these and other "flow lanes" through which storm surge could pass and reach upland areas, Mr. McNeal does not think they qualify as a frontal dune. Landward of the mounds is a manmade dune constructed by the applicant pursuant to a "field permit" from the Department which Hanson is offering as part of the mitigation for the impacts of the proposed project. The manmade dune spans the length of the project site (110 feet), is about 15 feet wide, and is 7 feet high. It is planted with sea oats. It was constructed with 109 cubic yards of sand. The manmade dune offers little protective value because of its small size. The primary benefits of the manmade dune are that it increases the volume of sand in the system and is vegetated. Landward of the manmade dune is a natural dune on the project site that is about 220 feet long (shore parallel), 5.0 to 8.3 feet in height, and 35 to 60 feet wide. Petitioners' coastal engineer, Karyn Erickson, believes this dune qualifies as a frontal dune. Mr. Walther thinks it is a primary dune. All the coastal engineers agreed that it was a significant dune because it provides some protective value to upland properties. However, despite this dune's height and vegetation, it lacks continuity, being interrupted on the north side by Elm Avenue, and flattening to some extent on the southeast on the Brown property and then terminating before it reaches Pine Avenue. The dune would not prevent storm surge from passing around it to inundate upland properties. Therefore, it does not provide sufficient protective value to qualify as a frontal dune. For the same reason, it does not qualify as a primary dune. It is probably most accurate to describe this dune as a remnant of what was once a primary dune. The Proposed Project The CCCL permit authorizes the construction of a single-family dwelling, slab, storage enclosure, entry foyer, shell driveway, and landscaping. The Department's permit file number is ME-919. In July 2007, the project site was conveyed from Buky to Hanson. In November 2009, the Department approved a request to transfer the CCCL permit from Buky to Hanson. The exterior dimensions of the dwelling are 58 feet by 29.3 feet, which is about 30 percent of the project site. The proposed dwelling would have two habitable floors elevated above the ground on pilings. The lower floor would be 17.5 feet above sea level, which is the elevation necessary to protect the structure from the 100-year storm surge. Underneath the dwelling would be a concrete slab or pad for parking, a storage enclosure, and a stairway. The proposed project would be located on top of the natural dune located on the project site. The height of the dune underneath the slab varies, but would have to be made level for the slab. Hanson would add 20 cubic feet of sand to the dune. The finished slab would be at a minimum height of 6.5 feet. The building would be constructed in a manner to prevent the creation of wind- or water-borne debris in the event of a hurricane. The proposed driveway and slab would eliminate some natural vegetation, including some sea oats and two sea grape trees. To mitigate for the proposed project's impact to the dune and vegetation, Hanson placed 100 cubic yards of sand on the project site to create the manmade dune and planted it with sea oats. In addition, Hanson would install sea oats, sea grapes, and cabbage palms seaward of the dwelling. The dwelling has been moved as far landward as is allowed under the local government building code. The proposed project would comply with the lighting guidelines of the Florida Fish and Wildlife Conservation Commission for the protection of sea turtles. Hanson obtained a letter of no objection from the City of Anna Maria for the proposed project. Permit Criteria Criteria for issuance of a CCCL permit are found in Florida Administrative Code Rule 62B-33.005(4): The Department shall issue a permit for construction which an applicant has shown to be clearly justified by demonstrating that all standards, guidelines, and other requirements set forth in the applicable provisions of Part I, Chapter 161, F.S., and this rule chapter are met, including the following: The construction will not result in removal or destruction of native vegetation which will either destabilize a frontal, primary, or significant dune or cause a significant adverse impact to the beach and dune system due to increased erosion by wind or water; The construction will not result in removal or disturbance of in situ sandy soils of the beach and dune system to such a degree that a significant adverse impact to the beach and dune system would result from either reducing the existing ability of the system to resist erosion during a storm or lowering existing levels of storm protection to upland properties and structures; The construction will not direct discharges of water or other fluids in a seaward direction and in a manner that would result in significant adverse impacts. For the purposes of this rule section, construction shall be designed so as to minimize erosion induced surface water runoff within the beach and dune system and to prevent additional seaward or off-site discharges associated with a coastal storm event. The construction will not result in the net excavation of the in situ sandy soils seaward of the control line or 50-foot setback; The construction will not cause an increase in structure-induced scour of such magnitude during a storm that the structure- induced scour would result in a significant adverse impact; The construction will minimize the potential for wind and waterborne missiles during a storm; The activity will not interfere with public access, as defined in Section 161.021, F.S.; and The construction will not cause a significant adverse impact to marine turtles, or the coastal system. Rule 62B-33.002(33) defines "impacts" for purposes of CCCL permitting: “Impacts” are those effects, whether direct or indirect, short or long term, which are expected to occur as a result of construction and are defined as follows: “Adverse Impacts” are impacts to the coastal system that may cause a measurable interference with the natural functioning of the coastal system. “Significant Adverse Impacts” are adverse impacts of such magnitude that they may: Alter the coastal system by: Measurably affecting the existing shoreline change rate; Significantly interfering with its ability to recover from a coastal storm; Disturbing topography or vegetation such that the dune system becomes unstable or suffers catastrophic failure or the protective value of the dune system is significantly lowered; or Cause a take, as defined in Section 379.2413(1), F.S., unless the take is incidental pursuant to Section 379.2413(1)(f), F.S. “Minor Impacts” are impacts associated with construction which are not adverse impacts due to their magnitude or temporary nature. “Other Impacts” are impacts associated with construction which may result in damage to existing structures or property or interference with lateral beach access. The proposed project involves the destruction of some native vegetation, but it will not destabilize the natural dune on the project site or cause a significant adverse impact to the beach and dune system. Removing vegetation can destabilize a dune because the vegetation prevents the loss of sand, primarily by wind erosion. However, in this case, the structure would block the wind and prevent the loss of sand. The more persuasive evidence shows that the amount of remaining vegetation, the additions of new sand and plantings, and other project conditions provide reasonable assurance that the dune would not be destabilized. This finding is further supported by the evidence that the portion of the dune that is on the Brown property has not been destabilized by the Brown project and is growing. The proposed project would not involve the removal or disturbance of in situ sandy soils to such a degree that a significant adverse impact to the beach and dune system would result. The total volume of sand associated with the dune upon which the house would be constructed would be increased by 20 cubic yards. Petitioners made much of the fact that the peak height of the natural dune on the project site would be reduced. However, Petitioners did not show this would change the functional or effective height of the dune. Common sense indicates that a dune with a peak that is over 8 feet high will not block an 8-foot storm surge if most of the dune is only 6 feet high. In this example, the effective height of the dune would be 6 feet, and an 8-foot storm surge would pass over the dune. The more persuasive evidence shows that the proposed project would not reduce the existing ability of the system to resist erosion and protect upland properties and structures. The proposed project would not direct discharges of water or other fluids in a seaward direction or in a manner that would result in significant adverse impacts. The proposed project would not result in the net excavation of the in situ sandy soils seaward of the control line. When the manmade dune is included, the proposed project would add about 129 cubic yards of sand to the project site. The proposed project would not cause an increase in structure-induced scour of such magnitude during a storm as to result in a significant adverse impact. The proposed project would minimize the potential for wind and waterborne missiles during a storm. The dwelling would be elevated above the 100-year storm surge to allow the waves to move under the structure and minimize structural damage. The proposed project would not interfere with public access. The proposed project would not interfere with marine turtle nesting. The permit contains conditions to assure that the proposed activities would not disturb nesting turtles or cause a significant adverse impact to marine turtles or the coastal system. Minmization of Impacts The expected impacts to the beach and dune system in this area are small. Hanson has minimized these potential impacts and provided mitigation so that no significant adverse impact would result. The proposed dwelling is smaller than the adjacent Brown house and would be located as far landward as the local government setback requirements will allow. Hanson would further minimize potential impacts to the beach-dune system by adding 129 cubic yards of sand to the project site and planting native, salt-tolerant vegetation. Frontal Dune The natural dune on the project site is not a frontal dune. Therefore, Petitioners' contention that the proposed project is not a sufficient distance landward of the beach and frontal dune to permit natural shoreline fluctuations and protect beach and dune system stability, is rejected. Line of Construction Existing structures in the immediate area have established a reasonably continuous and uniform construction line and these structures have not been unduly affected by erosion. The proposed project conforms to this existing line of construction and would not advance the line seaward. Cumulative Effects Petitioners contend that the cumulative effects of this proposed project and the adjacent Brown project would cause a significant adverse impact to the natural dune that crosses these properties. However, the more persuasive evidence shows that the portion of the dune on the Brown site remains stable and is even growing. Petitioners claimed that the Department acted inconsistently by treating the dune on the Brown property as "removed" by the Brown project, but treating the dune on the Hanson property as unaffected by Hanson's proposed project. However, neither Petitioners' Exhibit 17 nor any other evidence in the record establishes what changes, if any, occurred to the dune on the Brown property. It was not shown that part of the dune on the Brown property was physically removed. Furthermore, Petitioners did not show that, because the Brown project was on the dune, the Department determined that the affected portion of the dune was "removed" or ceased to function as a dune. There was no evidence presented of the existence of a coastal engineering principle that, when a structure is located on a dune, it is equivalent to removing the affected portion of the dune. Taken together, the effects of the proposed project and the Brown project would not significantly reduce the protective value of the dune. 30-Year Erosion Projection Before issuing a permit to construct major structures seaward of the CCCL, the Department is required to make a thirty-year erosion projection in the area. See § 161.053(6)(b), Fla. Stat. The 30-year erosion projection “is the projection of long-term shoreline recession occurring over a period of 30 years, based on shoreline change information obtained from historical measurements. See Fla. Admin. Code R. 62B-33.024(1). Generally, major structures seaward of the CCCL must be landward of the 30-year erosion projection. See § 161.053(5)(b), Fla. Stat. The proposed project is a major structure. The 30-year erosion projection in this area of Anna Maria Island was produced and recommended to the Department by Emmett Foster, an employee of the Beaches and Shores Resource Center at Florida State University. Mr. Foster was the principal author of the latest version of Rule 62B-33.024. Rule 62B-33.024(2) describes several procedures for determining the 30-year erosion projection, which can be used in combination. Mr. Foster's projection made use of the rule procedure that allows "credit" for beach nourishment projects. Mr. Foster assigned a 10-year credit to the nourishment project based on the history and performance of the nourishment projects in the area and the likelihood of continuing nourishments. His 30-year erosion projection is seaward of Hanson's proposed project. Petitioners disputed the procedure used by Mr. Foster. Their coastal engineer, Ms. Erickson, believes that a beach nourishment credit should not have been included in the analysis. Using an alternative procedure in the Rule 62B- 33.024, Ms. Erickson placed the 30-year erosion projection three feet landward of the most seaward edge of the proposed project (± 30 feet).4/ However, Petitioners failed to show that Mr. Foster's analysis was professionally unsound.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department issue a final order granting the CCCL permit to Hanson. DONE AND ENTERED this 7th day of December, 2010, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 7th day of December, 2010.
The Issue The issues are whether Petitioner's application for a Notice of Proposed Change to its Development of Regional Impact constitutes a substantial deviation from the criteria in Section 380.06(19)(b)1.-15., Florida Statutes, and whether the proposed change is consistent with Bay County's Comprehensive Plan.
Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background Petitioner, Bay Point Club, Inc. (Petitioner), is the owner of Parcels F, 9, 10, and 12 located within the Bay Point Yacht and Country Club Resort Development of Regional Impact (Bay Point DRI) in Panama City, Florida. The Bay Point DRI was approved by Respondent, Bay County (County), on July 22, 1986, and authorized the development of 2,161 residential units, 200 hotel units, 123 marina slips, and recreational facilities on approximately 946 acres. The County is responsible for issuing development orders for projects that are to undergo development of regional impact review, including amendments to development orders of previously determined DRIs, in conformity with the requirements of Section 380.06, Florida Statutes. When the original Development Order was issued in 1986, Bay Point Yacht & Country Club was the sole developer of the Bay Point DRI. Since that time, the ownership and control of the properties within the Bay Point DRI has changed, and there are now multiple owners and developers of the 36 separate development areas or parcels included within the Bay Point DRI, including Petitioner, who owns the above four parcels. The Bay Point DRI was approved by the County prior to the adoption of its Comprehensive Plan (the Plan). When the first Plan was adopted in 1991, the County recognized and incorporated the Bay Point DRI through the adoption of an overlay to the Future Land Use Map (FLUM) which delineates the boundaries of the property. As stated in Future Land Use Element Policy 3.4.5, the overlay was adopted to ensure the consistency and compatibility of the Bay Point DRI with the County's FLUM. Parcels F and 12 were designated as "Seasonal/Resort" and Parcels 9 and 10 were designated as "Residential" on the FLUM. These designations remain in effect as of the date of the final hearing. A Seasonal/Resort classification allows a broad range of uses such as beach houses, multifamily housing, condominiums, hotels, lodges, restaurants, and other similar uses, while a Residential classification permits those land uses typically associated with residential occupancy. The Bay Point DRI has been amended 15 times, which amendments cumulatively reduced by 145 the total number of residential units. None of these amendments constituted a substantial deviation from the approval given in the original Development Order, and the County has never required a corresponding amendment to its Plan, FLUM, or DRI overlay as a condition for approval for any of these changes to the DRI. In July 1993, PFP One, Inc., Petitioner's parent company, entered into a Purchase and Sale Agreement with the Federal Deposit Insurance Corporation, as manager of the FSLIC Resolution Trust Fund, to purchase Parcels F (a waterfront lot adjacent to the Bay Point Marina), 10, and 9 for $235,000. At that time, Parcels 9 and 10 were vacant, and they remain vacant today. A private membership tennis facility was operating on Parcel F through a lease agreement Petitioner inherited as a part of the purchase. These tennis facilities were closed on April 1, 2000, due to a lack of membership support. Parcel 12 was purchased by PFP One, Inc. in 1994. It contained a private clubhouse facility which had once been operational prior to the approval of the DRI, but was closed at the time of the sale. The clubhouse was remodeled by Petitioner shortly after the Parcel was purchased and reopened the same year. Due to a lack of membership support, however, the clubhouse was closed in 1996. The single-family residential portion of Bay Point begins within a few hundred feet west of the above Parcels. The Development Order currently provides the following descriptions for Parcels F, 12, 10, and 9: Parcel F: Located adjacent to the Bay Point Clubhouse, this 4.8 acre site currently supports the Bay Point Tennis Center. As a part of Bay Point's long term plan, the Tennis Center is scheduled to be moved to Area 9 in 1986. In 1987, a 70-unit condominium project designated as Port Towers is planned to be built on this waterfront site. [A] total of 97,000-sq. ft. of heated and cooled space are planned. Included will be a pool and recreation center. Building height would be restricted to not more than five stories with a majority of the project being of the two and three story height. Four, 2100 sq. ft. penthouse units, eight (8) 1,800 sq. ft. three-bedroom units, forty (40), 1400 sq. ft. two-bedroom units and eighteen (18), 1000 sq. ft. one-bedroom units are planned. There would be no restrictions of resort rental use, although it is assumed that, like Marina Club Village, the vast majority of these units will be primary and secondary homes because of pricing. Restrictive covenants for this project would be developed similar to those currently in force at Bay Point. Parcel 12: A 4-acre main clubhouse site, which is adjacent to the swimming pool, snack bar, health club and real estate facilities, is in the vested area and was substantially completed prior to July 1, 1973. Parcel 10: This one acre site is the planned location of the new Sport Center Clubhouse which will serve Bay Point's member golf facilities and the resort's tennis and health facilities. Included in the 14,000 square ft. Clubhouse will be a 90-seat restaurant and snack bar area, a health club, exercise and massage rooms, men and women's locker rooms, offices for the Director of Tennis and Golf Professional and a classroom. Additional space will house the club's sports retail center which sells both hard and soft goods associated with golf, tennis and physical exercise. Parcel 9: This 6 acre site has been set aside as the future location of the Bay Point Tennis Center. When completed, it will consist of up to 14 tennis courts, one of which will be the center court with stadium stands. The original description of Parcels F and 12 reflects that the acreage of the two sites combined is 8.83 acres. A survey completed just before the NOPC was submitted determined that the combined acreage of the two parcels was actually 9.67 acres. Petitioner has stipulated that in the event the smaller acreage number is correct, the density that will be developed on the property will be in conformity with the limitations imposed by the smaller acreage. On May 14, 2001, Petitioner filed with the County a Notification of Proposed Change to a Previously-Approved Development of Regional Impact (NOPC) under Section 380.06(19), Florida Statutes. Copies were also provided to the Department of Community Affairs (DCA) and the West Florida Regional Planning Council (Council). Under the NOPC, Petitioner proposes to change the Development Order as to Parcels F and 12 as follows: The proposed project will be a 136-unit condominium project with approximately 58 units on Parcel F and 78 units on Parcel 12. The number of units on both parcels will increase from the current 70 units authorized on Parcel F to 136 units on Parcels F and 12 combined, a cumulative increase of 66 units. Three concrete structures are planned. The center building, which is the farthest from any existing development, is 11 stories in height with a step increase to 12 stories. The two exterior buildings are six stories in height with step increases to ten stories. All improvements to the project will be built by year end 2004, which is the current build-out date for the Bay Point DRI, as amended. The existing tennis courts located on Parcel F will be reduced to four hard surface courts with separate restroom facilities. The residential units will consist of 1, 2, 3 and 4 bedroom condominiums, approximately 900 to 2,400 sq. ft. in size. Thus, the proposed change in Parcels F and 12 will increase the number of condominium units from 70 to 136, change the height limitation from 5 stories to 12 stories, and eliminate the existing tennis facility. In addition, Petitioner proposes to eliminate the swimming pool and clubhouse now located on Parcel 12 and replace them with condominiums. The NOPC also proposes to change the Development Order as to Parcels 9 and 10 in the following manner: The designations for Parcels 9 and 10 will be changed from "Tennis Complex" and "Sports Center/Clubhouse," respectively, to Recreation. These changes are sought because of the historical absence of community or public support for the existing private tennis and clubhouse facilities presently located on Parcels F and 12. Funded through annual memberships by residents of Bay Point and the public, support for these facilities has been insufficient to economically sustain them and justify their continued operation. Consequently, due to lack of membership support, the Clubhouse on Parcel 12 was closed in 1996. For the same reason, the tennis courts on Parcel F were closed April 1, 2000. Changing the designation on Parcels 9 and 10, from Tennis Complex and Clubhouse to Recreation[,] will afford the Applicant with the flexibility needed to develop new or expanded active and/or passive recreational opportunities which the residents of Bay Point are willing and able to support, and which are economically feasible. In no event, however, will the Applicant develop, or allow others to develop, recreational facilities on Parcel 9 or Parcel 10 which exceed the intensity standards authorized for the development of these properties by the original Bay Point DRI. Under these proposed changes, Parcels 9 and 10, which are predominately wetlands, will remain undeveloped and constitute a passive recreation area. The changes proposed in the NOPC will require corresponding changes to the uses originally approved for Parcels F, 12, 10, and 9 in the Bay Point DRI Development Order, including changes to Map H, the Master Development Plan Map. The changes proposed by the NOPC for the DRI Development Order, including the changes to Map H, will not require a corresponding amendment to the underlying land use designations for Parcels F and 12 (Seasonal/Resort) and Parcels 9 and 10 (Residential). The NOPC was reviewed by the Council for conformity with the requirements of Section 380.06(19)(f)4., Florida Statutes. On June 11, 2001, the Council advised the County that the changes proposed for Parcels F, 9, 10, and 12 did not appear to constitute a substantial change from the previously- approved Bay Point DRI. The DCA did not submit a written objection to the proposed NOPC. On August 7 and September 7, 2001, the County held quasi-judicial public hearings on the NOPC. At the latter meeting, the County denied the NOPC on the basis of a 2-2 tie vote regarding the question of whether the proposal constituted a substantial deviation. The County did not make any determination with respect to the question of whether the NOPC was consistent with its Comprehensive Plan. This finding was confirmed in a letter from the County Attorney's Office dated September 7, 2001, and transmitted to Petitioner on September 11, 2001. On October 11, 2001, Petitioner filed its Petition to Appeal DRI Development Order with the Florida Land and Water Adjudicatory Commission (Commission). On November 7, 2001, Intervenors, K. Earl Durden, David Allen Spencer, Harry B. Sipple, III, Unal Tutak, David W. Hill, Lucy N. Hilton, and William F. Fusselman, who all own property within the Bay Point DRI and have standing to participate, filed a Petition to Intervene. On November 8, 2001, Intervenor, Bay Point Community Association, Inc., which is the homeowners' association for the approximately 1,300 residences within the Bay Point DRI and likewise has standing to participate, filed its Petition to Intervene. These Petitions were granted by the Commission on December 19, 2001. Although the Petitions to Intervene contended that the NOPC constituted a substantial deviation requiring further DRI review by the County, that issue has been abandoned. Remaining at issue is the contention that the NOPC is inconsistent with the County's Comprehensive Plan (Plan) by generally failing to protect residential property values, promote viable neighborhoods, and maintain the community character in residential areas, as required by various Plan Objectives and Policies. Intervenors also contend that the NOPC lacks a needed stormwater plan. In more simple terms, however, Intervenors object to any high- rise development in an area surrounded by single-family residential homes and in a community (Bay Point) where no other buildings exceed seven stories in height. The characteristics of the community Bay Point is a unique, residential resort development on St. Andrews Bay in Panama City, Florida. A large portion of the land lying north of Bay Point is owned by the United States Navy; thus, Bay Point is somewhat isolated from the unplanned developments which occur in other inland areas, as well as along the Gulf of Mexico. Residential and commercial development commenced in Bay Point in 1971. To date, no high-rise buildings have been constructed in the community. Most structures are one or two stories in height, and only four buildings in Bay Point exceed two stories: the Bay Town commercial and condominium development (three stories); the Lagoon Towers condominium with sixty-three units (seven stories), which is the tallest building in Bay Point; the Marriott Legends Edge timeshare with twenty-eight units (six stories); and the Marriott Hotel (five stories). The three tallest buildings are in the extreme southeast portion of Bay Point a minimum of 1,600 feet and as far as 3,000 feet from the site of Petitioner's proposed high rise condominium buildings. When viewed from a distance, the four buildings which exceed two stories in height can barely be seen above the tree line. Bay Point is a mixed use development because it includes residential and nonresidential uses, as well as some community facilities. However, it is fair to state that Bay Point is a low-rise, low-density residential development, and it was planned as a predominately residential community under the 1986 DRI Development Order. Access to the residential part of the community is controlled through gates and a security force. Although there are some resort rental activities and tourist accommodations (a Marriott hotel), Bay Point is comprised of predominately permanent residents. There are 681 single-family homes on individual lots in the western portion of Bay Point, which are one and two-story structures comprising 79.9 percent of the development in Bay Point. The two-story single-family homes tend to be clustered along the bay or along the canals running through the development. As originally developed, commercial development made up only 10.4 percent of the land area of Bay Point. Of that total, 6.6 percent is retail and office development (such as offices, restaurants, retail shops, and a post office); 1.5 percent is commercial recreation (pro shops and golf and tennis club); and 1.7 percent is a Marriott Hotel. In addition, community facilities (including a playground for children) comprise 1.5 percent of the land area. There is also a 201-slip marina and a semi-private golf club on the premises. The "resort core" area of Bay Point refers to certain development in the Seasonal/Resort land use category containing a mixture of mainly seasonal and tourist residential, commercial, and noncommercial uses. Of the almost 1,000 acres in the Bay Point DRI, only about 24 acres were planned and approved for "resort core," or less than 15 percent of the 200 acres designated as Seasonal/Resort. The remaining 85 percent of the Seasonal/Resort area has a predominately residential character. Petitioner's project on Parcels F and 12 is far from any development that could be characterized as "resort core," and all of the development in the immediate vicinity of and surrounding Parcels F and 12 is residential development with structures not exceeding two stories in height. Thus, Petitioner cannot rely on any perceived proximity of Parcels F and 12 to the "resort core" as a basis for justifying the high-rise structures. Consistency with the Plan Intervenors contend that the NOPC is inconsistent with Future Land Use Element (FLUE) Policy 3.4.5 (which allegation is subject to an objection by Petitioner); Housing Element Objective 8.5; Housing Element Policy 8.5.1; Housing Objective 8.9 (which allegation is subject to a Motion to Strike); Stormwater Management Objectives 5E.9 and 5E.12; Stormwater Management Policies 5E.9.1, 5E.10.1, and 5E.12.1; and FLUE Policy 3.3.1. Each of these items will be addressed separately below. As a part of its 1999 Plan (which amended and updated the 1991 Plan), the County adopted special treatment zones (STZs) to be designated on the FLUM in addition to the future land use categories. The specific STZs are established pursuant to FLUE Objective 3.4, which provides that the zones are created "for purposes of dealing with unique or desirable circumstances." The unique circumstance in this case is the DRI. In the Plan, the County has either adopted or expressed its intent to adopt distinct land development regulations or land use controls for each STZ. FLUE Policy 3.4.5 establishes the Bay Point DRI STZ. This policy provides that: [t]he Bay Point Development of Regional Impact (DRI) Special Treatment Zone shall be established in order to ensure compatibility and consistency between the Bay Point DRI Development Order and the FLUM. Development in this area shall be governed by the DRI Development Order. (Emphasis supplied) The last sentence of Policy 3.4.5 was added by comprehensive plan amendment adopted on July 10, 2001. By virtue of the underscored language, the conditions and restrictions on the use and development of Parcels F, 9, 10, and 12 in the DRI Development Order in effect on July 10, 2001, are incorporated into the County's Plan. This was confirmed at hearing by the County's Planning and Zoning Manager. Thus, the maximum five-story height limitation on Parcel 12 contained in the DRI Development Order is incorporated into the Plan by reference through Policy 3.4.5. Because all three of Petitioner's proposed high-rise condominium buildings exceed the five-story height limitation for Parcel F found in the DRI Development Order in effect on July 10, 2001, the NOPC is inconsistent with Policy 3.4.5. Objective 8.5 of the Housing Element provides that all projects in the County will "preserve and protect the character, compatibility, and aesthetics of residential areas and neighborhoods through the enforcement of land use regulations." Petitioner contends that this Objective cannot apply to the development on Parcels F and 12 because these parcels are in a mixed land use category under the FLUM and therefore are not in "residential areas or neighborhood" as contemplated by the Objective. However, the Objective refers to "residential areas and neighborhoods," and not to future land use categories. Thus, the Objective is directed towards existing residential and multi-family development in Bay Point, including Intervenors' property, and must be taken into account when judging the merits of Petitioner's application. "Character" and "aesthetics" are not defined in the Plan. Rather, they are terms of art in the planning profession and are commonly understood by planning professionals. These terms refer to development as it exists, not development that could occur based on a land use category. This is because one cannot protect the character and aesthetics of a land use designation. The evidence shows that "character" consists of those attributes that lend a sense of place to an area, which people in the area can identify with that is distinguishable from other such areas. It includes such factors as type of buildings, building height and mass, the relationship of one building to another, the types of activities that go on in the area or neighborhood, the presence or absence of vegetation, the presence or absence of underground utilities, street design, architectural design, and the preservation of the long-standing stable nature of a neighborhood. "Aesthetics" are those attributes that determine whether an area is visually pleasing. The character of the Bay Point community is that of a stable, low-rise, low density, residential resort community. The buildings in Bay Point consist of individual homes and small villa or townhouse-type buildings clustered on parcels. There are no high-rise buildings in the community or beachfront property. The evidence clearly supports a finding that Bay Point is a predominately neighborhood residential community. Petitioner proposes to construct on Parcels F and 12 three separate high-rise buildings. The outer buildings are six stories at their exteriors, with step increases to ten stories at the interiors. The center building will be eleven stories at the outer edges, with a step up to twelve stories at the peak. The construction of these high-rise condominiums will be in stark contrast to, and out of harmony with, the existing low-rise, low-bulk structures which surround the proposed project and will dramatically change the low-rise, neighborhood character of Bay Point. Thus, the proposed condominiums are not consistent with Objective 8.5 in that they do not preserve the character of the existing residential development within Bay Point. Policy 8.5.1 of the Housing Element requires compatibility between types of residential structures. The Policy also requires that specific criteria be included in the County's Land Use Code "for the preservation and protection of residential areas." It further provides that these standards should ensure that "compatibility between types of residential buildings" will be maintained, and that "residential areas will be used primarily for residential purposes." As of the date of hearing, however, no standards had been adopted, although the County is now in the process of developing such criteria. Until specific criteria are adopted and included in the Land Use Code, Petitioner contends that the Policy cannot be relied upon by Intervenors. If this proposition were true, however, no existing project could be measured for compatibility, and the Policy would be meaningless. The more persuasive evidence supports a finding that in the absence of specific standards in the Land Use Code, it is appropriate to rely upon standards used by land use professionals for determining compatibility between types of residential buildings. Indeed, every land planning expert who testified at hearing agreed that a consistency determination should be made based on the guidance provided in the Objectives and Policies of the Plan. The County has addressed the subject of compatibility in Objective 3.9 and Policy 3.9.1 of the Future Land Use Element. The former provision provides that "[a]ll proposed land uses shall be compatible with adjacent conforming land uses," while the latter provision defines "compatibility" to mean "a condition in which land uses or conditions can coexist in relative proximity to each other in a stable fashion over time such that no use or condition is unduly negatively impacted directly or indirectly by another use or condition." The evidence establishes that land use planners view compatibility as meaning the relationship between buildings, uses, and activities to one another. Factors to be used in making this determination are density, building height, scale and mass, lot configuration, and building orientation. Other factors used in this determination include established development patterns, expectations that arise from established development patterns, character of the neighborhood, and stability of the neighborhood. The evidence supports a finding that the development pattern in Bay Point, the expectations of Intervenors and the community based on that development pattern, and the atypical height and mass of Petitioner's project render the proposed project incompatible with Bay Point and thus inconsistent with Objective 8.5.1 of the Plan. In making this finding, the undersigned has found that Petitioner's compatibility analysis is too narrow in scope and ignores the reality that Petitioner proposes to develop three high-rise buildings, grouped together in one location, in an established, predominately low-rise residential community. Objective 8.9 of the Housing Element requires that any project in the County "[p]rotect residential property values and ensure that each homeowner has the opportunity for quiet use and enjoyment of their residence." Thus, in order to be consistent with the Plan, Petitioner must demonstrate that its project will not impact the residential property values in Bay Point in a negative manner. To demonstrate consistency with the foregoing Objective, Petitioner's expert opined that the proposed project would infuse new capital and value into the Bay Point area thereby increasing property values. However, Petitioner's market study (Petitioner's Exhibit 12) is flawed in several respects. For example, it incorrectly defines the Bay Point neighborhood as including an intensely developed Gulf front tourist district along Thomas Drive and the east end of Highway 98 in Panama City, within a three to six mile southern radius of Bay Point, and which includes high-rise condominiums, motels, and commercial uses that are dependent on the tourist industry. The study also concludes, erroneously, that most of the condominium units in Bay Point are utilized as second homes and rental properties by absentee owners. Finally, the study uses two "comparable" projects on which to base a market analysis, one in Destin and the other in Seascape. Neither property is really comparable since both are located on the Gulf of Mexico in neighboring Walton County. The more credible evidence establishes that the threat of development of high-rise buildings on Parcels F and 12 has caused a decline in residential property values in Bay Point. Further, if the NOPC is approved, the property values will continue to decline. This decline has been exacerbated by the loss of the Bay Point community center and tennis courts, which were previously located on the lots in question. Given these considerations, it is found that the NOPC is inconsistent with Housing Element Objective 8.9, in that the NOPC does not protect property values within the community. Intervenors further contend that the NOPC is inconsistent with various Objectives and Policies in the Stormwater Management Element since the NOPC does not contain a detailed stormwater plan for the proposed project. These Objectives and Policies are designed to reduce and eliminate flooding, protect surface waters from contamination and sedimentation caused by the stormwater, and prevent future problems by regulating development. This contention has been rejected since the specific requirements for the stormwater system necessary to serve Parcels F and 12 are not properly addressed in the DRI process, but rather will be considered by the County at the time the actual construction documents for these parcels are submitted for review and permitting. Finally, Intervenors assert that the NOPC is inconsistent with Future Land Use Element Policy 3.3.1, which designates criteria for designating land use categories on the FLUM and attendant standards for development. No credible evidence was presented on this issue, and therefore the contention has been rejected. All other matters raised by Intervenors have likewise been considered and rejected.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Land and Water Adjudicatory Commission enter a final order denying Petitioner's application for a NOPC on the ground that it is inconsistent with FLUE Policy 3.4.5, Housing Element Objective 8.5, Housing Element Policy 8.5.1, and Housing Element Objective 8.9 of the Bay County Comprehensive Plan. DONE AND ENTERED this 11th day of December, 2002, in Tallahassee, Leon County, Florida. ___________________________________ DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of December, 2002. COPIES FURNISHED: Donna Arduin, Secretary Florida Land and Water Adjudicatory Commission Office of the Governor The Capitol, Suite 2105 Tallahassee, Florida 32399-0001 Kenneth D. Goldberg, Esquire 1725 Mahan Drive, Suite 201 Tallahassee, Florida 32308-5201 Michael S. Burke, Esquire Burke & Blue 221 McKenzie Avenue Panama City, Florida 32401-3128 Robert C. Apgar, Esquire Sherry A. Spiers, Esquire Law Offices of Robert C. Apgar 320 Johnston Street Tallahassee, Florida 32303-6214 Richard W. Moore, Esquire Amundsen and Gilroy, P.A. Post Office Box 1759 Tallahassee, Florida 32302-1759 Raquel Rodriguez, General Counsel Florida Land and Water Adjudicatory Commission Department of Legal Affairs The Capitol, Suite 209 Tallahassee, Florida 32399-0001
The Issue Whether the permit application of Clifford S. and Maria Ray (the "Rays") meets the statutory and rule requirements for the Department of Environmental Protection ("DEP" or the "Department") to issue to the Rays a permit to construct a multi- family dwelling and related structures seaward of the coastal construction control line ("CCCL") on their property in Brevard County?
Findings Of Fact Legislative Intent re: Beaches and Coastal Barrier Dunes The Legislature has declared that the beaches and the coastal barrier dunes in this state, subject by their nature to severe fluctuations, represent one of the most valuable resources of Florida. See § 161.053(1)(a), Fla. Stat. The Legislature has further declared that it is in the public interest to preserve and protect the beaches and dunes from imprudent construction because it can "jeopardize the stability of the beach-dune system, accelerate erosion, provide inadequate protection to upland structures, endanger adjacent properties, or interfere with public beach access." Id. The Legislature has therefore directed the Department of Environmental Protection "on a county basis along the sand beaches of the state fronting the Atlantic Ocean [and other salt water bodies]" to "establish coastal construction control lines." Id. The "Coastal Construction Control Line" A line of jurisdiction, rather than a line of prohibition, the Coastal Construction Control Line (the "CCCL or the "Control Line") is defined in Chapter 62B-331 of the Florida Administrative Code. The Control Line is: the line established pursuant to provisions of Section 161.053, F.S., and recorded in the official records of the county, which defines that portion of the beach-dune system subject to severe fluctuations based on a 100-year storm surge, storm waves, or other predictable weather conditions. Fla. Admin. Code. R. 62B-33.002(12). The Department's Office of Beaches and Coastal Systems has regulatory authority to permit or deny construction seaward of the Control Line pursuant to statutory and rule criteria. This proceeding concerns the exercise of that authority in the form of issuance of a permit for activity seaward of the Control Line in Brevard County. Brevard County's Control Line The Control Line in Brevard County was established by the Department of Natural Resources, an agency of the state and a predecessor of DEP, in 1981 (the "1981 CCCL"). A second Control Line in Brevard County was established in 1986, again by the Department of Natural Resources. It is approximately 150 feet landward of the 1981 CCCL. It will be referred to in this order as "the CCCL" or "the Control Line." The line established in 1981 will be referred to as the "1981 CCCL," to distinguish it from the Control Line established in 1986, the Coastal Construction Control Line applicable to this proceeding. The Parties Mrs. Pope Petitioner, Carole C. Pope, owns with her husband James M. Pope, oceanfront property located at Wilson Avenue, Brevard County, Florida, where the Popes reside part time. The Popes' property has a Cocoa Beach mailing address, but is not within the city limits of Cocoa Beach. Littoral to the Atlantic Ocean, the Popes' property was identified in the pre-hearing stipulation in the Rule-related Cases (discussed in this Order's Preliminary Statement) as "Lot 11, Block 101, Avon by the Sea as described in Plat Book 3, page 7 [presumably the Official Records of Brevard County] and east to Ocean, except the west 13 feet of Lot 11." See Final Order, Pope v. Department of Environmental Protection et al., Case No. 03-3860RX, paragraph 7, page 9. The Popes have two duplex units on their property. Built in the 1950's, they consist of concrete foundations, block walls, and 10-foot-high flat roofs. Mrs. Pope and her husband have retained the native, salt-tolerant vegetation that surrounds the duplexes. Protective of the property because it serves to enhance and stabilize the primary/frontal dune, it also adds to Mrs. Pope's enjoyment and use of her property. She enjoys the native flora, an integral part of the habitat of native fauna (gopher tortoises and indigo snakes, for example) that she enjoys watching. She particularly enjoys feeding and interacting with the sociable scrub jay. The Department and its Office of Beaches and Coastal Systems The Department is responsible for the administration of Parts I and II of Chapter 161, Florida Statutes, the "Beach and Shore Preservation Act." § 161.011, Fla. Stat. The Act confers on the Department the authority "to adopt rules related to the following provisions of this section [§ 161.053]: establishment of coastal construction control lines; activities seaward of the coastal construction control line; exemptions; property owner agreements; delegation of the program; permitting programs; and violations and penalties." § 161.053 (21), Fla. Stat. Pursuant to its rule-making authority in Section 161.053 (together with other specific authority), Florida Statutes, the Department promulgated Rule Chapter 62B-33: "Office of Beaches and Coastal Systems - Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line and Fifty-Foot Setback)." The Office is in the Department. Fla. Admin. Code R. 62B-33.002(11). Permits for construction or other activities seaward of the construction control line, such as the permit in this case, are issued pursuant to Section 161.053, Florida Statutes, by the Program Administrator of the Bureau of Beaches and Wetland Resources on behalf of the Department. See Respondents 1, Vol. 2, Tab 22. The Department has not delegated Chapter 161 permitting authority to Brevard County. The Rays Clifford and Maria Ray are the owners of the property adjacent to Petitioner's property and the holders of Permit No. BE-1083, preliminarily issued by the Department in its final order of September 19, 2003. The property consists of four 50-foot-wide lots, Lots 12, 13, 14 and 15 in Avon by the Sea. Lot 12 is immediately adjacent to Mrs. Pope's property. Some of the native vegetation on the property has been disturbed by the planting of sod and installation of an irrigation system seaward of the Brevard County coastal setback line and the Control Line. The activity is the subject of administrative enforcement actions by the County and DEP. Although government claims of violations had not been resolved finally as of the date of hearing, the Rays have not resisted the claims. The Permit was issued to the Rays under the authority of Section 161.053, Florida Statutes. It authorizes activities on the Ray property seaward of the CCCL. This activity includes the construction of an eight-story, multi-family dwelling, a swimming pool and deck, a wooden beach/dune walkway, a parking area, masonry wall and an exfiltration trench, as described in more detail in the section of the Permit entitled "PROJECT DESCRIPTION." Respondents Ex. 1, Vol. 2, Tab 22, Permit No. BE- 1083, p. 2-3. The Department was not aware of the claims of violations made against the Rays referred-to above at the time that Mr. Tammisetti, the engineer assigned to review the permit file initially, recommended that the permit be issued. Had Mr. Tammisetti been aware of the claims he still would have recommended issuance of the permit. Coastal Systems and Fixed Coastal Cells The term "Coastal System" is defined by the Department in its rules: "Coastal System" is the beach and adjacent upland dune system and vegetation seaward of the coastal construction control line; swash zone; surf zone; breaker zone; offshore and longshore shoals; reefs and bars; tidal, wind, and wave driven currents; longshore and onshore/offshore drift of sediment materials; inlets and their ebb and flood tide shoals and zones of primary tidal influence; and all other associated natural and manmade topographic features and structures. Fla. Admin. Code R. 62B-33.002(13). Within the coastal system are "fixed coastal cells," also defined by Department rule: "Fixed Coastal Cell" is a geomorphological component of the coastal system which is closely linked internally by active physical processes and is bounded by physical features which exercise a major control on refraction patterns or which compartmentalize or severely limit longshore sediment such as headlands or inlets. Fla. Admin. Code R. 62B-33.002(24). Within and adjacent to a fixed coastal cell of Florida's coastal system lie sea, shore, beach, dune system, vegetation, uplands and structures with which this proceeding is concerned. The Beach and Dune System within the Fixed Coastal Cell The Ray property and the Pope property are located in a fixed coastal cell that extends from Canaveral Inlet (north of R014, one of a series of coastal monuments installed by the state) southward to Monument R050. The community in which the property is situated is a "Coastal Uplands: Beach Dune" community characterized by a beach and dune system. There is one primary/frontal dune with a height at the top of the bank of about 13.4 feet NGVD seaward of the proposed project. The portion of property on which the project is sited is between 7.3 and 10.7 feet NGVD. The most recent DEP design wave height elevation for R015 is 14.2 feet NGVD, higher than the existing dune elevation at the Ray property. Much of the Ray property behind the dune is lower in elevation than the elevation of contiguous properties, the likely result of persistent cutting of native vegetation that acts to intercept wind-blown sand as it moves along the shoreline. Beach and Dune Data in DEP File BE-1083 In the application review process, Mr. Tammisetti submitted a memorandum dated May 24, 2001, to Mr. McNeal. The memorandum appears to have been a form with blanks into which information was inserted or handwritten close to the appropriate blank. For example, under Section I., of the form "PROPOSED PROJECT" is "A. Project Location:", followed by a description with blanks left for number of feet, direction (north, south, east, west) reference monument number, county and project address. Handwriting close to the blanks leads one to understand or gather that it intends to communicate the following statements: The location of this project is approximately 100 feet N to 103 feet S of the Department of Environmental Protection's Reference Monument R-15, in Brevard County. Project Address: Harding Ave, Cape Canaveral. This is within the local jurisdiction of Brevard County. Respondents 1, Vol. 2, Tab 13. The form also contains Section II., "CHARACTERIZATION OF BEACH/DUNE SYSTEM". The section calls for three categories of characterization: A., a general description; B., beach topography in terms of shoreline alignment, berm width in feet, berm elevation in feet (NGVD), direction of net littoral transport, volume of net littoral transport in cubic yards per year, and general conditions; and C., Primary Dune/Bluff Topography with dune width in feet. None of the information called for by this section has been filled in on the form. At hearing, Mr. Tammisetti testified2 that berm width was 220 feet and the berm elevation ranged from 3 to 10 feet NGVD. He testified that the direction of littoral transport was north to south but he did not know the volume of net littoral transport. He stated that the "general site condition" was an eroding shoreline. He estimated the dune width at between 30 to 40 feet. These facts and figures exist under an overarching consideration. The beach near R015 that fronts the Pope and Ray property is critically eroding.3 Vegetation on the Ray Property There is a sea grape cluster and numerous palm trees on the Ray property. The seaward most continuous line of native salt-resistant vegetation or the "vegetation line" is near the line at the toe of the slope of the dune bank depicted on the topographic survey drawing submitted as part of the application. Nanette Church, at the time an employee of Brevard County, visited the site on July 1, 2003. She documented the presence of fresh sod and a new irrigation system installed seaward of the County's coastal setback line, a line parallel to and 25-feet landward of the 1981 CCCL. Two days later, DEP Inspector Gene Verano conducted a site inspection and documented the placement of sod and the installation of an extensive irrigation system. On July 31, 2003, the Department under the signature of Jim Martinello, an Environmental Manager in the Bureau of Beaches and Wetland Resources, issued a warning letter to Mr. Ray with regard to "POSSIBLE UNAUTHORIZED ACTIVITIES SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE." The letter reads, in part, Pope 3. [I]t appears that you have again been engaged in unauthorized activities on your property located approximately 100 feet north to 100 feet south of the Department of Environmental Protection's reference monument R-15, in Cocoa Beach, in Brevard County, Florida. The possible violation consists of the destruction/removal of native vegetation and placement of sod and an irrigation system seaward of the coastal construction control line without benefit of a permit from the [department.] The sod seaward of the CCCL has a negative effect on the stability of the dune system. A weakened dune system allows for storm surge and overwash to breach the dune and cause washout on the landward side of the dunes. Brevard County has not yet issued a land clearing or landscape permit to the Rays. A "Brevard County Land Development Site-Plan Approval" with an approval date of December 30, 2003, warned, "[i]t is the responsibility of the Owner/Engineer of Record to contact Office Natural Resources for a Land Clearing/Landscaping Permit." Respondents' 1, Vol. 1, Tab 12. The Rays are not contesting County or DEP enforcement actions relative to the land clearing, sod placement, and irrigation system installation. Project Description The project proposed by the Rays is to be located on their property in the unincorporated area of Brevard County known as "Avon-by-the-Sea," in the vicinity of Department monument R-015. The project is known by Brevard County as the Ray Condos and also as the Michelina Condominium. The location of the multi-family dwelling relative to the Control Line is "[a] maximum of 105.56 feet seaward." Id. Its exterior dimensions are "209.67 feet in the shore normal direction by 84 feet in the shore-parallel direction." Id. The type of foundation is "Pile." Id. There is no mention in the Permit of the height of the building. The swimming pool is described in the Permit in detail with regard to its dimensions and location (a maximum of 101.49 feet seaward of the control line), the type of construction and its maximum depth: six feet. Excavation/Fill for the project is described in terms of volume of excavation, its location, volume of fill as replacement, and location of fill. The Excavation/Fill description is subject to Special Permit Condition 6. Among other provisions of the condition, the fill is to be "from a source landward of the control line and shall consist of sand which is similar to that already on the site in both grain size and coloration." Id., p. 4. Other permitted structures and activities are listed and described in the Permit with reference to special permit conditions: A wooden beach/dune walkway structure of dimensions 174 feet shore-normal by 4 feet shore-parallel is to be located seaward of the control line. See Special Condition 7. A 4-foot to 14-foot swimming pool deck attached to the periphery of the swimming pool is to be located a maximum of 105.96 [feet] seaward of the control line. See Special Permit Condition 2.1. Paver-block parking area on the south side of the proposed dwelling. Masonry walls along the north and south property lines to extend a maximum of 105 feet seaward of the control line. See Special Permit Condition 2.2. An exfiltration system trench on the south side of the proposed dwelling. Among nine special conditions in the Permit are that no work can be conducted until a DEP "notice to proceed" has been received by the Rays. Another is that prior to the issuance of such a notice "two copies of detailed final site and grading plans and specifications" shall be submitted including two sets of landscape drawings. Id., p. 3, Special Permit Condition 2. See id., 2.3. The landscape plan must be submitted to Brevard County for approval under the Permit's special conditions. Given Brevard County's requirement that the Rays secure a Land Clearing/Landscaping Permit, there will be an ongoing process that poses the potential to ensure that the Rays' project will be designed to minimize the impact on native vegetation. The process also may require a restoration plan, as well, for the impact to native vegetation caused by the sod and the irrigation system. The Rays have submitted such a plan to the County. Relationship of the Proposed Project to the Pope Property The proposed multi-family dwelling is sited 10 feet south of the northern property line (the line that serves as the southern boundary of the Pope property). Ten feet is the minimum setback from adjacent property allowed by the county. The duplexes on the Pope property are situated in a range from 3.5 to 4.5 feet from the property line (the border with the Ray property.) The project, therefore, is proposed to be as close as 13.5 feet of the Pope duplexes. If built, running the length of the duplexes, it would create a relatively narrow space between the proposed structure and the Popes' duplexes that ranges from 13.5 feet to 14.5 in width. The Application The Rays submitted their CCCL permit application to the Department through their agent, Joyce Gumpher. On January 24, 2003, Ms. Gumpher executed a certification "that all information submitted with this application is true and complete to the best of [her] knowledge." Respondents Ex. 6, APPLICATION FOR A PERMIT FOR CONSTRUCTION SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE OR FIFTY-FOOT SETBACK. The application was received by DEP on January 27, 2003. Additional information was requested by the Department. On April 21, 2003, the Department deemed the application complete. During the application process, several plan sheets were revised. Revised plan sheets were submitted after the application was deemed complete (see Respondents' Ex. 6, July 29, 2003 plans and September 5, 2003 plans) and once prior to DEP's determination of its completeness. (see id., April 7, 2003 plans). Review of the Application On August 26, 2003, Mr. Tammisetti submitted a memorandum to Mr. McNeal that recommended approval of the application with special permit conditions. The memorandum, similar in form to the memorandum submitted on May 24, 2001, except for the lack of Part II., is entitled "Description of Beach and Dune System Fronting the Subject Property and an Analysis of Impacts to be Expected From the Proposed Construction." Respondents 1, Vol. 2, Tab 20. It describes the proposed project but, lacking Part II., it neither characterizes nor describes the beach/dune system. Nor does it analyze the impacts of the proposed project other than to provide the "final comment" that "[t]he proposed project is landward of line of construction and 30-year erosion project. Impactive shore- parallel coverage is approximately 72%." Id., p. 3. Under its rules, after reviewing all information required, the Department is mandated to: Deny any application for an activity which either individually or cumulatively would result in a significant adverse impact including potential cumulative effects. In assessing the cumulative effects of a proposed activity, the Department shall consider the short-term and long-term impacts and the direct and indirect impacts the activity would cause in combination with existing structures in the area and any other similar activities already permitted or for which a permit application is pending within the same fixed coastal cell. The impact assessment shall include the anticipated effect of the construction on the coastal system and marine turtles. * * * Require siting and design criteria that minimize adverse impacts and mitigation of adverse or other impacts. Fla. Admin. Code R. 62B-33.005(3). As found earlier, the file in BE-1083 does not contain any documentation that the Department conducted the impact assessments required by the rule. Nonetheless, the Department based its evaluation on the portion of the fixed coastal cell from just north of R013 to approximately 400 feet south of R017 depicted on Respondents' 7. Respondents' 7 Respondents' 7 is an aerial photograph of developed uplands and off shore waters of the Atlantic Ocean in between which is the shore line and a stretch of beach in Brevard County. The sandy beach in the photo runs from north to south from Monument R013 to approximately 400 feet south of Monument R017, five monuments in a series set by the state along the Brevard County coast. The photograph is data the Department reviewed to determine if existing structures established a "reasonably continuous and uniform construction line closer to the mean high water line than [the coastal construction control Line]." § 161.053(5)(b), Fla. Stat. (This "reasonably continuous and uniform construction line" will be referred to as the "Construction Line" in this order.) The Pope property and the Ray property both straddle the Construction Line. The photograph shows four structures (the "Four Structures") that were determined by DEP to establish the Construction Line. Two are to the north of the Ray property; two are to the south. Of the two structures to the north, the closest is between 400 and 450 feet north of the northern boundary of the Ray property. It sits between Monument R015 and R014. The other structure to the north used to establish the Construction Line lies between Monument R014 and R013. Its southernmost corner is approximately 1200 feet to the north of the northern boundary of the Ray property. The roof of the closest of the Four Structures to the south, lying between Monument R015 and R016, viewed from the air above is rectangular indicating the structure to have a rectangular footprint. Positioned at an angle to the coast, its southeastern corner is along the 1981 CCCL. That corner is approximately 400 feet south of the southern boundary of the Ray property. The second structure to the south sits between R016 and R017. Its northernmost corner is roughly 850 feet south of the southern boundary of the Ray property. The Application Rule Florida Administrative Code Rule 62B-33.008(4), entitled "Permit Application Requirements and Procedures" (the "Application Rule"), requires that the Rays' application contain certain specific information, including that identified in subsection (f): Two copies of a topographic survey drawing of the subject property. The topographic information depicted in the drawing shall be from field survey work performed not more than six months prior to the date of the application. The rule further calls for the topographic survey drawing to include specific information such as "[t]he location of any existing vegetation line on the subject property." Fla. Admin. Code R. 62B-33.008(4)(f)9. The topographic survey drawing submitted as part of the application in January of 2003 reveals a survey date of "7/17/02." Respondent's Ex. 1, Sketch of Boundary and Topographic Survey, Lots 12-15, Block 101, Avon by the Sea, Brevard County, Florida. Other than the date of the survey, the evidence at hearing did not reveal when the fieldwork in support of the survey was conducted.4 In all likelihood the fieldwork was conducted close to July 17, 2002, but obviously prior to July 17, 2002. Whether the date of the application is considered to be the date of Ms. Gumpher's certification (January 24, 2003), or the date of its receipt by DEP (January 27, 2003), it does not depict "field survey work performed not more than six months prior to the date of the application." January 24, 2003, is six months and one week after July 17, 2002. January 27, 2003, is six months and 10 days after the date of the survey. The Vegetation Line The topographic survey drawing submitted as part of the application did not meet precisely the requirements of the Application Rule in several other ways. For one, it did not label the location of "any existing vegetation line on the subject property." At hearing, the Rays submitted a revised copy of the topographic survey drawing (still dated "7/17/02"). The revision labels a line indicated on the originally submitted topographic survey drawing as "TOE OF SLOPE" (within a few feet of the top of the dune bank) as "TOE OF SLOPE AND VEGETATION LINE." Thus, it is apparent that the originally submitted topographic survey drawing depicted the vegetation line; it merely failed in its labeling of the vegetation line. The Department, once it became aware of the omission of a reference to a vegetation line in the original submission, waived the requirement for one. At hearing, Mr. McNeal testified that the waiver was authorized by subsection (7) of the Application Requirements and Procedures Rule: The Department recognizes that the requirements specified in paragraphs 62B- 33.008(4). . . (f) . . ., F.A.C. may not, due to the project circumstances, be applicable or necessary to ensure protection to the beach and dune system. In such cases, the applicant shall, as part of the application, identify those requirements and state the reason why they are inapplicable. The Department shall waive requirements that do not apply. Fla. Admin. Code R. 62B-33.008(7). There is no evidence of record that the Rays informed DEP of a position that the "location of the vegetation line" on the topographic survey drawing was a requirement inapplicable or unnecessary to ensure protection to the beach and dune system.5 Nonetheless, construing its waiver authority to be broader than authority limited to cases in which identification of inapplicable and unnecessary requirements had been made by those seeking DEP waivers, the Department waived the requirement. The waiver was based on knowledge gained from the experience of DEP employees. The employees (Mr. Tammisetti and Mr. McNeal) knew that the vegetation line would be close to the top of the dune bank line and the toe of slope line, both of which were located on the topographic survey drawing.6 Respondents' 2 supports the Department's waiver since it labels the vegetation line where the Department roughly expected it to be. Complete Dimensions and Distance Perpendicular The Application Rule further demands that the topographic survey drawing contain: 15. Accurate dimensions and locations of the foundation outlines of any structures in the immediate contiguous or adjacent areas that the applicant contends have established a reasonably continuous and uniform construction line if the permit is requested under the provisions of Section 161.053(5)(b) or 161.052(2)(b), F.S., and the distance perpendicular [the "Distance Perpendicular"] from the CCCL or 50-foot setback to the seaward corners of the foundations of any major structures . . . . Fla. Admin. Code R. 62B-33.008(4)(f). The application contained the dimensions and locations of the two (2) duplexes located on the Pope property, that is, the adjacent area to the north of the Ray property. With regard to the adjacent area to the south of the Ray property, the application contained the seaward dimensions and locations of the major structure that makes up the Discovery Beach Resort structure. The topographic survey drawing did not contain the dimensions of the complete footprint of the Discovery Beach Resort. Nor did it contain the distance perpendicular from the CCCL or 50-foot setback to the seaward corners of the foundations of all major structures depicted. Mr. McNeal noticed that required elements were missing from the application. When he made the permitting decision, he waived them pursuant to a delegation of authority from the Office of Beaches and Coastal Systems. Delegations of Authority Office of Beaches and Coastal Systems The Director of the Office of Beaches and Coastal Systems has delegated certain authority to subordinates in the Office of Beaches and Coastal Systems with respect to the CCCL permitting program. The delegations, as reflected in a document entitled "Delegations of Authority, OFFICE OF BEACHES AND COASTAL SYSTEMS" (Pope Ex. 1), is to "the Director of Office of Beaches and Coastal Systems, or his/her designee." Id., 3.a. As the administrator of the CCCL program within the Bureau of Beaches and Wetlands Resources, Mr. McNeal has been delegated authority under Delegation "OBCS-9" (id., p. 14 of 24), to "[t]ake final agency action on permit applications . . . pursuant to Sections . . . 161.053 . . ., Florida Statutes, and Rule 62B-33, F.A.C., [subject to exceptions immaterial to this proceeding.]" Id. The authority so delegated is not without limitation. Among limitations enumerated and express in the Delegations of Authority document is that "[t]the exercise of any delegated authority shall conform with all statutes and rules applicable to the DEP." Id., 3.a. Waivers Pursuant to Delegated Authority Pursuant to the authority over final agency action on CCCL permit applications, Mr. McNeal, as the head of the CCCL Program in the Office of Beaches and Shores, waived the depiction of the location of the vegetation line on the topographic survey drawing, the full dimensions of the Discovery Resort in the adjacent area to the south of the Ray property and the notation of the Distances Perpendicular. He did so because the information contained on the topographic survey drawing was sufficient, in his view, to allow the Department to perform the calculations and analyses as part of the application process that would be served by a review of the topographic survey drawing. An example has been alluded to in this order. Based on years of collective experience, Mr. McNeal and Mr. Tammisetti concluded it was reasonable to assume the vegetation line would be very near the toe of the slope line in relation to the dune bank. Their assumptions were proved correct at hearing. The dimensions and locations of the major structures located immediately north and south of the proposed project (the Pope duplexes and the Discovery Resort structure) and the Distances Perpendicular were required to be included on the topographic survey drawing, but they were not intended by the Rays to establish a Construction Line. Establishment of any such line is governed by Section 161.053(5)(b), Florida Statutes: If in the immediate contiguous or adjacent area a number of existing structures have established a reasonably continuous and uniform construction line closer to the line of mean high water than the foregoing [the CCCL], and if the existing structures have not been unduly affected by erosion, a proposed structure may, at the discretion of the department, be permitted along such line on written authorization from the department, if such structure is also approved by the department [and other conditions are met]. A Construction Line The Rays contend in their application and DEP agrees that the Four Structures establish a Construction Line. Once such a line is established provided the structures are not duly affected by erosion, the Department is conferred with the discretion to permit a proposed structure along the line seaward of the CCCL under certain circumstances. See § 161.053(5)(b), Fla. Stat. Among those circumstances, the permit "shall not contravene setback requirements or zoning or building codes established by a county or municipality which are equal to, or more strict than, those requirements provided [by statute.]" § 161.053(5)(b), Fla. Stat. Furthermore, by rule of the Department, written evidence from local government must be provided that the location of the proposed structure along a Construction Line seaward of the CCCL is consistent with the Local Comprehensive Plan. See Fla. Admin. Code R. 62b-33. Written evidence that Brevard County regards the Rays' proposed site to be consistent with Local Comprehensive Plan and not contrary to local setback requirements or zoning codes was provided by Brevard County to the Department. Establishment of a Construction Line Whether a Construction Line can be established for a proposed project is unique to the project and its coastal location. To establish such a line, the Office of Beaches and Coastal Systems may rely exclusively on information provided by the applicant for a permit to construct along such a line. The Office may also refer to its own database of aerial photographs (as it did in this case) and other data with regard to the State's coastal systems. The Construction Line running across the Ray property accepted by DEP is nearly identical to the 1981 CCCL. In contesting the establishment of the Construction Line, Mrs. Pope makes a number of points, several of which are worthy of discussion. For one, in 1993, the Department considered an administrative challenge brought by Mrs. Pope to the CCCL permit for the construction of the Days Inn Tower (now Best Western) hotel (one of the structures used by the Rays to establish a Line of Continuous Construction). See, OR-1, Pope v. Department of Environmental Protection et al., Agency Final Order dated May 9, 1994, DOAH Case No. 93-4560 (the "1993 Pope Case.) The Pope duplex had been found to be three or four blocks north of the property for which the permit was sought. If her property had been found immediately adjacent to the Days Inn Tower property, Mrs. Pope would have been accorded standing to contest issuance of the permit to the Days Inn Tower applicant. The hearing officer had recommended that Mrs. Pope not be accorded standing under the rule because her duplex property was not "immediately adjacent" to the Days Inn Tower parcel. Since Mrs. Pope's parcel was separated by at least what has been identified in this proceeding as the Ray property and the property of the Discovery Resort, she did not qualify for standing under the DEP Rule. Nevertheless, Mrs. Pope was afforded the opportunity to acquire standing by proving that her substantial interests would be affected by issuance of the permit. The hearing officer concluded that her attempt in this regard failed.7 The Department accepted the hearing officer's recommendation that Mrs. Pope be determined to have no standing, in part because her property was not "immediately adjacent" to the Days Inn Tower property. Mrs. Pope also asserts that the Four Structures along the 1981 CCCL do not establish a Construction Line on the basis of the testimony of her witness, Dr. Harris. Dr. Harris opined that the structures to be used to establish the Line of Continuous Construction, if one exists, are not the four used by DEP that are in the area of the Ray property but the structures on the two pieces of property closer to the Ray property, that is, immediately adjacent: the Pope property to the north and the Discovery Resort property to the south. The easternmost point of the structure on the Pope property is approximately 50 feet landward of the 1981 CCCL and extends approximately 100 feet seaward of the Control Line. The structure on the Discovery Resort property to the south is along the Control Line. See Respondents' 7. The line that Dr. Harris would establish does not run parallel to the shore line, the 30-year erosion line, the 1981 CCCL or the Control Line. It would run at an angle of approximately 15 degrees from the easternmost point of the Pope duplexes (the "point of beginning") about 425 feet to the easternmost point of the Discovery Resort structure. The point on the Discovery Resort structure (at the end of the line) is approximately 100 feet seaward of the point of beginning. If these structures are to be considered in the determination of whether a Construction Line exists as Mrs. Pope argues, then continuing the line to include the Four Structures would yield broken lines rather than a reasonably "uniform" and "continuous" line. The Department did not consider the structures in the property immediately adjacent to the Ray property to break the line it determined is established by the Four Structures. It ignored other structures as well between the northernmost and the southernmost of the four structures. Mrs. Pope, therefore, describes the Construction Line established by the Department as "imaginary" and without a factual basis. This point is one of opinion. The Construction Line is neither imaginary nor without a factual basis. It has a factual basis in precisely the data used by DEP: the aerial photograph that shows four major structures between Monuments R013 and R017, Respondents' 7, along the 1981 CCCL. The disregard for the Pope duplexes and the Discovery Resort structure as well as other structures in the areas north and south of the Ray property is a matter that falls within professional opinion and Department expertise. The establishment of the Construction Line is justified by the data DEP examined: Respondents' 7 (on which the Four Structures were identified and circled by Mr. Tammisetti at hearing.) The greater weight of the evidence is that DEP's determination of the establishment of the Construction Line should not be disturbed. It is, moreover, not surprising that such a line exists. One would expect that structures built after 1981 but before 1986 would be located along the 1981 CCCL and that structures that followed (such as the Discovery Resort structure) would be built along that Construction Line. Post-establishment of a Construction Line Establishment of a Construction Line does not entitle an applicant to a permit to build along that Construction Line. After a Construction Line is accepted by DEP as established, an applicant must satisfy three remaining sets of conditions expressed in Section 161.053(5)(b), Florida Statutes. Section 161.053(5)(b), Florida Statutes A discretionary exercise Once a Construction Line is established, an application for a permit to allow a proposed structure is subject to the discretion of the Department: "a proposed structure may, at the discretion of the department, be permitted along such line on the written authorization of the department, if such structure is also approved by the department." ii. Local Requirements The Department has no such discretion, however, if the construction or activity would "contravene setback requirements or zoning or building codes established by a county or municipality which are equal to, or more strict than . . . requirements [in chapter 161]." Id. To this list, the Department, by rule, has added consistency with state-approved Local Comprehensive Plans. See Fla. Admin. Code R. 62B- 33.008(4)(d). Before exercise of department discretion and inquiry into compliance with local requirements, there is a more fundamental condition that must be demonstrated by the applicant: the existing structures that establish the Construction Line must not have been unduly affected by erosion: If in the immediate contiguous or adjacent area a number of existing structures have established a [Construction Line], and if the existing structures have not been unduly affected by erosion, a proposed structure may, at the discretion of the department, be permitted along such line . . . [h]owever, the department shall not contravene [local requirements] . . . equal to, or more strict than, those requirements herein. § 161.053(5)(b), Fla. Stat. Unduly Affected by Erosion The parties differ in their view of the testimony and evidence introduced at hearing with regard to whether structures that establish the Construction Line "have not been unduly affected by erosion." Id. Neither DEP employees nor the Rays' witnesses visited the shoreline between R0-13 and R-017 to evaluate the four structures that establish the Construction Line and the effects of erosion, if any.8 Mrs. Pope asserts in her Proposed Recommended Order, "[n]o evidence or testimony was offered as to whether the structures considered by DEP were affected by erosion." Petitioners' Proposed Recommended Order, p. 24. In contrast, Respondents cite to the testimony of Mr. Boehning and Respondent's 7 with the assertion, "[t]he existing structures, which form the line of continuous construction, have not been unduly affected by erosion." Respondents' 7 supports the claim of Respondents. It reveals a distance perpendicular from the Construction Line to the dark, wet sand along the shore to be approximately 275 feet. This distance encompasses white sandy beach that is approximately 175 feet and a vegetated area that is approximately 100 feet. The finding that the structures that establish the Construction Line are not unduly affected by erosion does not mean that there are not erosion problems in the area. In fact, as found earlier in this order, the beach depicted on Respondents' 7 is "critically eroding." The stretch of beach depicted in the aerial photograph that is Respondents' 7 has undergone considerable fluctuation since 1963 through erosion and beach nourishment. From 1972 to 2002, for example, the location of the mean high water line at R-015, the monument closest to the Pope and Ray properties, has varied by 206 feet from a low in September of 1972 to a high of 369.3 feet in April of 2001. Dr. Harris wrote this in a report introduced into evidence: The beach profile data show that at R-15 the beach and dune are subject to erosion. From 1972 to 2002 the variation in the MHW shoreline position was 206 feet. Beach nourishment and inlet sand by-passing operations were performed between some of the time periods, and are largely responsible for the periodic beach and dune widening. Even with the beach nourishment project, dune erosion continues to be a problem, and although the recent beach nourishment project greatly widened the beach, the position of the dune remained the same. The FDEP design wave height elevation for a 100-year storm is 14.2 feet NGVD for R-15, which is higher than the existing dune elevation. This means that the upland properties would experience storm surge, flooding and wave action during a 100-year storm. Pope 16. Projects of beach nourishment (placement of sand through human activity) were performed in 1972, 1986 and 2001. The need for beach nourishment and re-nourishment reinforces the status of the beach near R-015 as "critically eroding" and underscores the importance of protecting as much of the dune system as possible. That the beach is critically eroding is not inconsistent with a finding that the structures that establish the Construction Line are not unduly affected by erosion. Whether or not due to the 1986 and 2001 nourishment projects, the evidence of record is that, despite the status of the beach as critically eroding, the structures that establish the Construction Line are not unduly affected by erosion. Not Contrary to Local Requirements On December 30, 2002, a site-plan approval was issued by Brevard County with regard to "RAY CONDOS aka MICHELINA CONDOMINIUM" with a site address of "420 Harding Avenue, Cocoa Beach, FL 32931." Respondents' 1, Vol. 1, Tab 12, second page. Signed by the designee of the Director, Permitting and Enforcement, the development order is entitled, "BREVARD COUNTY LAND DEVELOPMENT SITE-PLAN APPROVAL" and contains the following: The site plan to which this approval is attached has been reviewed by affected County divisions, departments and agencies and has been determined to comply in general with the Brevard County Code of Ordinances and Comprehensive Plan Elements. * * * It is the responsibility of the Owner/Engineer of Record to contact Office of Natural Resources for a Land Clearing/landscaping Permit Two (2) sets of As-Built drawings must be provided to Land Development prior to the Issuance of a C.O. Id. The development order concludes with a statement related to the vested right of the Rays to develop in accord with the site plan: If a Certificate of Occupancy has not been issued for the principal structure by Dec. 30, 2005 the three (3) year vesting period, beginning with the date of site development plan approval, expires and said site plan shall become Null and Void. Only those phases of the development that have an active and valid building permit may be completed after the three-(3) year time period. Id. The reference in the site-plan approval to the "Brevard County Code of Ordinances" does not include building codes. The reference covers local setback requirements and zoning codes. Mrs. Pope appealed the issuance of the site-plan approval to the Brevard County Board of County Commissioners (the "Board"). Her appeal was heard over three meetings of the Board on May 6, 2003, June 8, 2003, and August 12, 2003. At the conclusion of the August 12, 2003, proceedings on the appeal, the Board voted unanimously to accept the staff recommendation to deny the appeal. An unnumbered resolution of the Board "DENYING THE APPEAL OF JAMES AND CAROLE POPE . . . PERTAINING TO THE MICHELINA CONDOMINIUM SITE PLAN" was produced by Mrs. Pope at the hearing together with the following statement of a Deputy Clerk for the Board: This is to advise that the Office of the Clerk to the Board of County Commissioners does not have any correspondence indicating a copy of the Findings of Fact on Michelina Condominium was forwarded to Mr. or Mrs. Pope. Pope 7. The resolution is signed by the Chairperson of the Board. Immediately below the signature block there appears the following: "(As approved by the Board on August 12, 2003)." Pope 8. The document is not stamped received by the Clerk of the Board or the County Clerk's Office, nor is there other clear indicia that the order has been rendered through a filing with the Clerk's office. On its face, however, appears an undated attestation of a deputy clerk under a seal of Brevard County that appears to attest to the Chairperson's signature. As of the dates of the final hearing in this proceeding, Mrs. Pope had not sought judicial review of the decision of the Board. At hearing, on the strength of the signed resolution denying Mrs. Pope's appeal of the site-plan approval and the site-plan approval, itself, and the apparent finality of the approval, Mrs. Pope was ruled estopped from presenting evidence that the Permit contravened local setback or zoning requirements or was inconsistent with the Local Comprehensive Plan. The establishment of a Construction Line, that the structures establishing the line are not unduly affected by erosion, and the collateral estoppel of Mrs. Pope's claim that construction or activity seaward of the Control Line along the Construction Line is contrary to local requirements, clears the way for the exercise of Department discretion as to whether to issue the permit. Department Discretion The Department's exercise of discretion must, of course, take into consideration the beach and dune system within the fixed coastal cell in which Ray property and the Pope property are located. No other conclusion could be gathered from the statements of legislative intent and the statutory scheme. Lest there be any misunderstanding, the Department has codified its policy statement on such matters: (1) The beach and dune system is an integral part of the coastal system and represents one of the most valuable natural resources in Florida, providing protection to adjacent upland properties, recreational areas, and habitat for wildlife. A coastal construction control line (CCCL) is intended to define that portion of the beach and dune system which is subject to severe fluctuations caused by a 100-year storm surge, storm waves, or other forces such as wind, wave, or water level changes. These fluctuations are a necessary part of the natural functioning of the coastal system and are essential to post-storm recovery, long term stability, and the preservation of the beach and dune system. However, imprudent human activities can adversely interfere with these natural processes and alter the integrity and functioning of the beach and dune system. The control line and 50-foot setback call attention to the special hazards and impacts associated with the use of such property, but do not preclude all development or alteration of coastal property seaward of such line; Fla. Admin. Code R. 62B-33.005, Department Policy Statement on Permits. The exercise of this discretion is guided by criteria under rule. Among those criteria are those found in 62B- 33.005(4)(g): The construction will not cause a significant adverse impact to marine turtles, immediately adjacent properties, or the coastal system unless otherwise specifically authorized in this rule chapter. Chapter 62B-33, Florida Administrative Code, defines the term "Impacts" to include separate definitions for the terms "Adverse Impacts," "Significant Adverse Impacts," "Minor Impacts," and "Other Impacts": "Impacts" are those effects, whether direct or indirect, short or long term, which are expected to occur as a result of construction and are defined as follows: "Adverse Impacts" are impacts to the coastal system that may cause a measurable interference with the natural functioning of the system. "Significant Adverse Impacts" are impacts of such magnitude that they may: Alter the coastal system by: Measurably affecting the existing shoreline change rate; Significantly interfering with its ability to recover from a coastal storm; Disturbing topography or vegetation such that the system becomes unstable or suffers catastrophic failure; . . . * * * (d) "Other Impacts" are impacts associated with construction which may result in damage to existing structures or property or interference with lateral beach access. Fla. Admin. Code R. 62B-33.002(30). Minimization of Impacts and No Significant Adverse Impacts The site selected on the Ray property for the proposed project poses impacts to Mrs. Pope's duplexes during a storm event such as a 100-year storm. Because of the shore- parallel dimension of the proposed structure (84 feet), storm- generated waves and storm surge would be concentrated into the relatively narrow gap between the proposed structure and the duplexes. The resulting hydrodynamic load would cause scouring of the foundations of the duplexes. The proposed project has "frangible" or "breakaway" ground level walls. They would pose the potential for generating waterborne missiles that, hydro-dynamically propelled, would damage the duplexes. The proposed project was designed in accordance with the American Society of Civil Engineers 7 Code ("ASCE-7") and most pertinently (since referenced in the Construction Line Statute), the Florida Building Code. But the Building Code does not take into consideration a proposed structure's design or proposed site on an adjacent property or the adjacent property's structures. The proposed project, moreover, is not designed and sited to mitigate aerodynamic loading on Mrs. Pope's duplexes. During high-wind conditions, there will be a number of wind effects on the duplexes caused by the proximity of the proposed project: gust loading, high turbulence shedding, and vortex shedding among others that can be reasonably expected to cause structural impacts to the duplexes such as suction loads on roofs and eaves, flying debris and window breakage. The proximity of the proposed structure to the Pope property will have a shading effect that will cause adverse impacts on the growth of native coastal vegetation on the Pope property. As a result, there will be a reduction in the interception of wind-driven sand by the vegetation that enables it to develop healthy, deep root systems that add to dune stability.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that: an impacts assessment be conducted as required by Florida Administrative Code Rule 33.005(3)(a); that the proposed project be re-sited to mitigate the impacts that its siting now poses to the Pope Property and the Popes' duplexes; that the proposed project be permitted to be constructed up to the Construction Line, provided that the permit is supported by both the impacts assessment and a re- siting of the proposed project to mitigate wind, water and shading impacts; and if the proposed project is not supported by an adequate impacts assessment, or if it cannot be re-sited to mitigate the impacts to the Pope Property, that the permit be denied. DONE AND ENTERED this 2nd day of March, 2004, in Tallahassee, Leon County, Florida. S DAVID M. MALONEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of March, 2004.
The Issue Whether the Sherry Petitioners have standing to initiate the proceeding in Case No. 10-0515? Whether the Oceania Petitioners have standing to initiate the proceeding in Case No. 10-0516? Whether the MACLA Intervenors have standing to intervene? Whether the Department should enter a final order that issues the JCP, the Variance and the SSL Authorization?
Findings Of Fact Setting and Preliminary Identification of the Parties These consolidated cases are set in Okaloosa County. They concern the Consolidated NOI issued by the Department to the County that indicate the Department's intent to issue state authorizations to allow the restoration of a stretch of beach known as the Western Destin Beach Restoration Project (the "Western Destin Project" or the "Project"). In addition to the Western Destin Project, there are other beach restoration efforts (the "Other Beach Restorations") which concern the Gulf of Mexico coastal system along the shores of the Florida Panhandle and about which the parties presented evidence in this proceeding. The applicants for the authorizations in the Other Beach Restorations efforts are either Okaloosa County or Walton County, the coastal county immediately to the County's east, and concern Okaloosa and Walton County property or are on federal property used by Eglin Air Force Base (the "Eglin Projects" or "A-3" or "A-13"). The Eglin Projects have been completed. The source of the sand use in the Eglin Projects is a borrow area designated by the County and its agent, Taylor Engineering, as "OK-A" ("OK-A" or the "OK-A Borrow Area"). The County intends that the OK-A Borrow Area be the source of sand for the Western Destin Project. West of East Pass, a passage of water which connects Choctawhatchee Bay and the Gulf of Mexico, the OK-A Borrow Area is between 4,000 and 5,000 feet off the shores of Okaloosa Island. Okaloosa Island is not an island. It is an area of the incorporated municipality of Fort Walton Beach that sits on a coastal barrier island, Santa Rosa Island. Except for the part of the final hearing conducted in Tallahassee, the final hearing in this case took place in Okaloosa Island. As Mr. Clark put it (when he testified in that part of the hearing not in Tallahassee), "I am in Okaloosa Island. [At the same time], I am on Santa Rosa Island." Tr. 521 (emphasis added). Petitioners in Case No. 10-0515, David and Rebecca Sherry and John Donovan (the "Sherry Petitioners") live along a stretch of beach that is in Okaloosa Island. They do not live along the stretch of beach that is within the area subject to the Western Destin Project. The Sherry Petitioners' stretch of beach is the subject of another beach restoration effort by the County (the "Okaloosa Island Beach Restoration Project"). The Okaloosa Island Beach Restoration Project, in turn, is the subject of another case at DOAH, Case No. 10-2468. The OK-A Borrow Area is much closer to the Sherry Petitioners' property than to the beach to be restored by the Western Destin Project. The Sherry Petitioners recognize the need for the restoration of at least some of the beaches in the Western Destin Project. The Sherry Petitioners initiated Case No. 10-0515, not to prevent the Western Destin Project from restoring those beaches, but because they are concerned that the beaches subject to the Okaloosa Island Project (including "their" beach) will suffer impacts from the dredging of the OK-A Borrow Area whether the dredging is done to serve the Western Destin Project or the other Projects the OK-A Borrow Area has served or is intended to serve. In contrast to the Sherry Petitioners, the Petitioners in Case No. 10-0516 (the "Oceania Petitioners") do, in fact, live on beaches in a section of the Western Destin Project that was slated for restoration when the Consolidated NOI was issued. The Oceania Petitioners are opposed to the restoration of the beaches subject to the Western Destin Project. They initiated Case No. 10-0516, therefore, because of that opposition. Walton County applied authorizations from the state for the Walton County/East Destin Project (referred-to elsewhere in this order as the "Walton Project"). The Walton Project, like the Eglin Projects, is completed. Unlike the Eglin Projects, and the intent with regard to the Western Destin Project and the Okaloosa Island Project, the Walton Project did not use the OK-A Borrow Area as its source of sand. The Walton Project used a Borrow Area to the east of OK-A (the "Walton Borrow Area"). The Walton Borrow Area is in an area influenced by the ebb tidal shoal formed by the interaction between East Pass and the Gulf of Mexico. The MACLA Intervenors (all of whom own property deeded to the MHWL of the Gulf in the stretch of beach subject to the Western Destin Project) together with the Sherry Petitioners and the Oceania Petitioners, seek findings in this proceeding concerning the impacts of the Walton Borrow Area to the beaches of Okaloosa County. They hope that findings with regard to Walton Borrow Area beach impacts will undermine the assurances the County and the Department offer for a finding that the Western Destin Project will not cause significant adverse impacts to the beaches of Okaloosa County. The Holiday Isle Intervenors support the Project. They are condominium associations or businesses whose properties are within the Project. Like the Eglin Projects, the Walton Project is complete. The Walton Project was the subject of a challenge at DOAH in Case Nos. 04-2960 and 04-3261. The challenge culminated at the administrative level in a Final Order issued by the Department that issued the state authorizations necessary to restore the Walton Project beaches. The Walton Project Final Order was appealed to the First District Court of Appeal where it was reversed. But it was reinstated in a decision by the Florida Supreme Court. The Florida Supreme Court decision was upheld when the United States Supreme Court issued a unanimous 9-0 decision less than two months before the commencement of the final hearing in these consolidates cases: Stop the Beach Renourishment, Inc. v. Fla. Dep't of Envtl Prot., 130 S. Ct. 2592 (2010). The Court held in Stop the Beach Renourishment that the Walton County Project was not a regulatory taking of property that demanded compensation to affected property owners under the Fifth Amendment to the United States Constitution. Stop the Beach Renourishment was argued before the United States Supreme Court in December of 2009, shortly before filing of the petitions that initiated these consolidated cases. The final hearing in these cases was not set initially until July 2010 in the hope that the Stop the Beach Renourishment case would be decided, a hope that was realized. In the meantime, another event threatened to affect these consolidated cases: the Deepwater Horizon Oil Spill (the "Oil Spill") in the Gulf of Mexico. The spill began with the explosion of the Deepwater Horizon oil platform in April of 2010 and continued until August of 2010 when the Oil Spill was stopped while these cases were in the midst of final hearing. The Joint Coastal Permit issued by the Department was revised to address impacts of the Oil Spill. No impacts, however, were proven in this proceeding by any of the parties. The Parties The Sherry Petitioners and Their Property David and Rebecca Sherry, husband and wife, are the leaseholders of "Apartment No. 511 [ a condominium unit] of Surf Dweller Condominium, a condominium with such apartment's fractional share of common and limited elements as per Declaration thereof recorded in Official Records . . . of Okaloosa County, Florida."2/ Their address is 554 Coral Court, #511, Fort Walton Beach, FL 32548. The Sherrys entered the lease for their condominium unit in May of 2002 in anticipation of it being their retirement home. After retirement, "towards the end of 2005," tr. 840, the unit became their permanent residence. They chose their home after an extensive search for the best beach in America on which to reside. The couple toured the Gulf Coast of Florida, the Keys and the Atlantic seaboard from South Florida into the Carolinas. Both explained at hearing why they picked the Panhandle of Florida in general and selected the Surf Dweller Condominium in particular as the place that they would live during retirement. Mr. Sherry testified: Tr. 841. This particular area we chose because of the beach quality. Quite frankly, . . . I was surprised when I first saw the place . . . the really stunning quality of it. The sand is absolutely beautiful. The water has that clear green hue. You can walk off shore and it just looks great. There isn't any other place like it in the Continental US that I've ever seen. Mrs. Sherry elaborated about the reasons for their choice to reside on the beach adjacent to the Surf Dweller and their enjoyment of the beach in the Okaloosa Island area of Santa Rosa Island. "We moved here for the quality of the beach, the sugar white sand." Tr. 936 (emphasis added). She explained that both she and her husband walk or run the beach daily. Mr. Sherry always runs; Mrs. Sherry's routine is to walk and run alternately. There are other distinctions in their daily traverses over the sugar white sand of Okaloosa Island. Mr. Sherry sometimes runs in shoes. As for Mrs. Sherry, however, she professed, I always run barefoot. I always walk barefoot and I take longer walks than he does. He runs the whole Island. I walk the whole Island and I run 3 miles at a time of the Island. So, that's the difference in the way we use [the beach.] Id. Mrs. Sherry described her activities on the beach more fully and how she enjoys it: I . . . swim. I surf on the skim board, float out in the water . . . I help Dave fish, we crab, . . . all sorts of things like that for recreation. Pretty much a beach person. I sit down on the beach under an umbrella with a lot of sunscreen. * * * I've always run barefoot. That's the reason [we chose the beach next to the Surf Dweller], it's not only the quality of the sand, [it's also] the fact that it's so soft because as I've aged, my husband and I have both been running for 30 years. He's in much better shape. I can still run barefoot and I can do a good pace, but if I've got shoes on, it's not nearly as much fun and I don't do nearly as much of it. So, to me, being able to have the squeak [of the sand underfoot], which you don't have with the restored sand is a big deal and having to wear shoes is a big deal. I really like to . . . [cross the beach] barefoot. Tr. 939. I actually think the project will impact me, at least, as much as my husband, David . . . my husband is . . . involved with . . . being board president of the Surf Dweller[.] I spend at least as much time as he does on the beach. And the way our furniture is arranged in the unit, it's so that when I'm in the kitchen, I bake the cookies, I see the beach, when I'm at the computer I can see the beach. I've got all the best views. So, I think I'm . . . extremely involved with it. It's the first thing I see in the morning; it's the last thing I see at night and I'm down there every morning. In fact, I was on the beach this morning before we came in . . . I don't miss my morning walk. Tr. 950. The Surf Dweller Condominium is located in Block 5 of Santa Rosa Island,3/ Okaloosa County, on real property that was deeded to the County by the federal government and then subsequently leased out by the County under long-term leases. The legal description of the Surf Dweller Condominium,4/ is: LOTS 257 TO 261, INCLUSIVE, LOTS 279, 280, 281, BLOCK 5, SANTA ROSA ISLAND, PLAT BOOK 2, PAGE 84, OKALOOSA COUNTY. Ex. P-8, PET7158. Block 5 of Santa Rosa Island is subject to Protective Covenants and Restrictions adopted by the Okaloosa Island Authority and recorded in the Official Records of the County at Book 121, Pages 233-250. See County Ex. 13. The Protective Covenants and Restrictions set up four classifications of areas denominated as Zones B-1 through B-4.5/ Block 5 of Santa Rosa Island is in Zone B-2, "Apartment, Hotel Court and Hotel Areas."6/ Part F of the Protective Covenants and Restrictions, provides, in part, Beach Protection * * * The beaches, for 300 feet inland from mean water level (or to the dune crest line, whichever is the greater distance), are under strict control of the Authority . . . One hundred fifty feet inland from the mean water line, in front of all B1 and B2 Areas, will be public beaches. The next 150 ft. inland will be private beaches as set out on subdivision plats . . . County Ex. 13, at page marked "BOOK 121 PAGE 242." The Surf Dweller Condominium property, lying between reference monuments R-6 and R-7, does not extend as far south as the mean high water line ("MHWL") of the Gulf of Mexico. From testimony provided by Mr. Sherry, see below, it appears that the Surf Dweller condominium property is deeded to the border with the beaches governed by Part F of the Protective Covenants and Restrictions. John Donovan is the leaseholder of "APARTMENT NO. 131 AND APARTMENT NO. 132, OF EL MATADOR, A CONDOMINIUM AS PER DECLARATION THEREOF, AS RECORDED IN . . . THE PUBLIC RECORDS OF OKALOOSA COUNTY, FLORIDA."7/ The address of the El Matador is 909 Santa Rosa Boulevard, Fort Walton Beach, FL 32548. Petitioner Donovan is not a resident of the State of Florida. His primary residence is in the State of Georgia. Mr. Donovan described in testimony his use and the use of his family of the beach seaward of El Matador and other parts of the Okaloosa Island area of Santa Rosa Island: I've . . . got to walk [for reasons of health] and I do walking every day I'm down here[.] I get all the way down to East Pass. I don't get down there every day, but I get down there a lot. My sons and my one grandchild take great pleasure in fishing off there, right at the end where the East Pass is right from the surf. * * * I swim. I don't swim probably as much as my co-petitioners [the Sherrys], but I'm sure I go out further. And I don't surf like David [Sherry] does but my grandchild would never tell me that I don't. I run as much as I can. Not as much as I used to. We also take long walks. Tr. 973-4. In a plat of El Matador Condominium introduced into evidence as part of Exhibit P-7, El Matador is described as: A CONDOMINIUM OF LOTS 557 THROUGH 590 INCLUSIVE, BLOCK 9 AND THE INCLUDED PORTION OF PORPOISE DRIVE THEREOF SANTA ROSA ISLAND A SUBDIVISION OF BLOCK 9 A RESUBDIVISION OF BLOCK 8 AS RECORDED IN PLAT BOOK 2, PAGE 190, PUBLIC RECORDS OF OKALOOSA COUNTY, FLORIDA Exhibit P-7, last page (un-numbered). Block 8 of Santa Rosa Island (like Block 5 in which the Surf Dweller Condominium is located) is also in Zone B-2 set up by the Protective Covenants and Restrictions. Block 8, just as Block 5, is governed by Part F, Beach Protection, of the Protective Covenants and Restrictions that places the beaches, for at least 300 feet inland, of the segment of Santa Rosa Island to which Block 8 is adjacent under the strict control of the County and makes the first 150 feet inland from the MHWL "public beaches." County Ex. 13, at page marked "BOOK 121 PAGE 242." El Matador Condominium lies between reference monuments R-1 and R-2. It is not deeded to the MHWL of the Gulf. The plat that is the last page of County Exhibit 13 shows the southern edge of the El Matador condominium property to be adjacent to the "FREEHOLDERS BEACH," Exhibit P-7, last page (un-numbered), landward of the Gulf of Mexico, that is, to the edge of the area of the private beach designated under the "Beach Protection" provision of the Protective Covenants and Restrictions, landward of the public beach designated by the same provision. Neither the Surf Dweller Condominium Property in which the Sherrys reside, nor the El Matador Condominium Property inhabited by Mr. Donovan abuts or is a part of the area subject to the Western Destin Beach Restoration Project. The two properties in Okaloosa Island are to the west of the Project. The Sherrys and Mr. Donovan did not initiate Case No. 10-0515 because they oppose the restoration of the beach subject to the Project. They initiated the proceeding because of concerns that the borrow area that will serve the Project is so close to Okaloosa Island and situated in such a way that once dredged it will cause adverse impacts to the Okaloosa Island beaches to the detriment of their use and enjoyment of the beaches. The Beach, Post-Hurricane Opal and Other Tropical Storms Beginning with Hurricane Opal in 1995, the beaches and shores adjacent to the Surf Dweller and El Matador Condominium Properties were seriously damaged. Nonetheless, there is a significant stretch of dry beach between the Surf Dweller and El Matador condominium properties and the MHWL of the Gulf. In the case of the Surf Dweller Property, Mr. Sherry estimated the width of the beach between the condominium property and the MHWL to be 300 feet. See his testimony quoted, below. The MHWL of the Gulf of Mexico is a dynamic line, subject to constant change from the natural influences of the coastal system. Whatever effect its ever-changing nature might have on the width of the beaches declared public and private8/ between the MHWL and the Surf Dweller and El Matador condominium properties, however, there can be no doubt on the state of the record in this proceeding that at the time of hearing there existed a 150 foot-wide stretch of beach water-ward of the two condominiums that the public has the legal right to occupy and use. Indeed, Petitioner David Sherry, when asked about the private beach and public beach governed by the Part F of the Protective Covenants and Restrictions in cross-examination conducted by Mr. Hall on behalf of the County, confirmed as much when he related the actual practice by the public in using it and the response that public use generated from him and his wife: Q If someone . . . crosses Santa Rosa Boulevard and utilizes this access[-]way that's marked on the map that you identified earlier, do they have the right to utilize any of the portion of [the private beach] of that 150-foot portion in front of your condominium? A . . . [N]o, they wouldn't have the right to do that. Q . . . [D]o they have the ability to set up an umbrella or place their towel within that 150-foot area [of private beach] in front of your condominium? A In that area, no. In the area south of that [the public beach] , which is where everyone actually sets up and wants to set up, in that area south, people set up and we don't have any problem with that. We let people do it -- Q On [the] public beach[.] A On the public beach they're perfectly free to do that. * * * Q I believe your testimony today, based on your GPS calculations, was that you have 300 feet of dry sand beach . . . running from the boundary of the condominium to the edge of the Gulf of Mexico; is that correct? A Essentially, from the building to the Gulf of Mexico. * * * Q So, 300 feet, roughly, from the boundary of the Surf Dweller Condominium common area down to the waterline? A Correct. Q So, there would be enough room today, based on the language of the restrictive covenants to have . . . 150 feet of public beach and then the 150 feet of Freeholders Beach as designated on the plat [in County Exhibit 13] now? A Much like it was in 1955 [when the Protective Covenants and Restrictions were adopted and recorded], yes. Tr. 891-3, (emphasis added). Since the first 150 feet of beach landward of the MHWL under the Protective Covenants and Restrictions is "public beach," there is no doubt that there is a stretch of beach between the Surf Dweller Condominium and the MHWL that is public beach and its width is at least 150 feet.9/ From aerial photographs introduced into evidence, the same finding is made with regard to beach that is public between El Matador and the MHWL of the Gulf. Mr. Donovan testified that his leasehold interest in his units at El Matador along with the interests of the other El Matador condominium unit leaseholders included 150 feet of private beach landward of the 150 feet of public beach adjacent to the MHWL of the Gulf of Mexico. His lawyer, moreover, advised him not to convert his leasehold interest into a fee simple ownership in order to protect his interest in access to the private beach designated by the Protective Covenants and Restrictions. See Tr. 986-87. Mr. Donovan is concerned about the erosion and turbidity impacts the borrow site could have on the Gulf and the beach. Erosion would change his view of the beach from the window of his condominium unit and aggravate a scalloping of the shore. The unevenness of the scalloped surface would cause him difficulties in his walks. Turbidity could attract sharks which would make it unsafe for him to swim. Most importantly to him, a change in the beach and shoreline along the El Matador Condominium property as drastic, in Mr. Donovan's view, as that contemplated by the Draft JCP could deter his family members (his grandchild included) from visiting him and vacationing at his unit in the El Matador Condominium. The Guidry Petitioners and Their Property Roland Guidry, a retired Colonel in the United States Air Force, is co-trustee of the Guidry Living Trust and the President of the Oceania Owners' Association, a condominium association governed by chapter 718, Florida Statutes. The Guidry Living Trust is the owner of Condominium Unit 605 in the Oceania Condominium, a condominium established under chapter 718, Florida Statutes. The address of the unit is 720 Gulf Shore Drive, Unit 605, Destin, Florida, 32541. In his capacity as co-trustee, Mr. Guidry has the independent power to protect, conserve, sell, lease or encumber, or otherwise to manage and dispose of trust assets, which include Unit 605 in the Oceania Condominium. The Oceania Owners' Association is mandated by the Oceania Declaration of Condominium to "maintain, manage and operate the condominium property." Ex. P-6 at 4. The declaration also declares, "[a]ll unit owners shall automatically become members of the association after completion of closing of the purchase of a unit in Oceania, A Condominium." Id. The Guidry Living Trust, therefore, is a member of Oceania Condominium Association. The powers of the officers and directors of the Oceania Owners' Association are set forth in the Declaration of Condominium that governs Oceania: The officers and directors of the association shall have the powers set forth in this declaration and the association bylaws, and shall, at all times, have a fiduciary relationship to the members of the association and shall operate and manage the association in the best interest of its members. Id. Oceania's Declaration of Condominium, furthermore, prescribes that "[t]he association shall have all powers granted by Chapter[s] 718 and 617, Florida Statutes." Id. at 5. Every member of the Oceania Owners' Association Board of Directors approved the initiation of Case No. 10-0516, according to the testimony of Colonel Guidry, but there was no documentary evidence offered that a vote had been taken of the Board of Directors at a board meeting on the issue of whether to file the petition that initiated Case No. 10-0516 or the outcome of any such vote. As an owner of a unit in Oceania, The Guidry Living Trust owns an undivided share of the Oceania Condominium's common property10/ which "comprise[s] all the real property improvements and facilities to Oceania, A Condominium, including all parts of the building other than the units . . . and . . . [certain] easements . . . ." P-6 at 1, 2. The Oceania Condominium real estate is deeded to the "APPROXIMATE MEAN HIGH WATER LINE OF THE GULF OF MEXICO". P-6, Exhibit "B." The Surveyor's Certificate on the survey of Oceania, A Condominium, attached to the Oceania Declaration of Condominium is dated January 16, 1996. The date is more than two months after Hurricane Opal made landfall and damaged the Okaloosa County coastline in October of 1995. Standing of the Oceania Petitioners Colonel Guidry did not appear at hearing in a personal capacity. He appeared in his capacities as co-trustee of the Guidry Living Trust and President of the Oceania Owners' Association. In contrast to the Sherry Petitioners, therefore, Colonel Guidry did not allege his personal use and enjoyment of the beach as a basis for standing. As to injury and standing of both the Guidry Living Trust and the Oceania Owners' Association, Colonel Guidry asserted a number of interests that he believed will be substantially affected by the Project. They fall into four categories of concern. The first concern is with regard to the action of the sand along the shoreline of the Oceania property after the two reaches of beach to the east and west will have been restored under the revisions to the Draft JCP. After construction activities, sand along the shoreline will equilibrate, that is, the sand will move or be transported so as to stabilize the shoreline. This stabilization or achievement of shoreline equilibrium will tend to move the shoreline along the Oceania property waterward. Colonel Guidry expressed his concern as follows: [The Oceania property] would be sandwiched . . . between two public beaches . . . mother nature will fill in what I call the Oceania Gap. Right now the only line we have on our beach is our southern property line [the MHWL of the Gulf][11] . . . . That's the only line I know of that's on our beach or will be placed on our beach. But if sand fills in, then that creates a cloud of confusion, if the State lays claim to this sand that accumulates in the Oceania Gap, as a result of the construction on both sides of us. Tr. 764, (emphasis added). The second category of concern relates to the location of the property post-construction between "two public beaches." Such a location, in Colonel Guidry's view, would make individual units at the Oceania Condominium less valuable. The third category is that the public would be more likely to trespass on private Oceania property. The fourth concern of Colonel Guidry is that the Project will have undesirable impacts to Oceania property owners' littoral rights to accretion and to touch the water. The first three concerns all stem from a decision made by the Board of County Commissioners after this proceeding was commenced to remove the Oceania property from the Project. Oceania Removed The beach and shore in the southern part of the Oceania condominium property,12/ (the "Oceania Beach Segment of Shoreline" or the "Oceania Gap") were originally subject to the Consolidated NOI for the Western Destin Beach Restoration Project. But on the eve of the date scheduled for the commencement of the final hearing in these cases, the Board of County Commissioners for Okaloosa County voted to remove the Oceania Beach Segment of Shoreline from the application for the Project. Taylor Engineering (the County's Agent) submitted a request to the Department that reads: On behalf of Okaloosa County, Taylor Engineering submits its request to modify the project area and Draft Joint Coastal Permit for the Western Destin Beach Restoration Project . . . The applicant has decided to remove the Oceania Condominium Property from the beach fill placement area. The revised project, as described in the enclosed permit drawings, includes two reaches: Reach 1 extends from the east jetty of East Pass to approximately 600 ft east of FDEP reference monument R-22 (R-22.6) and Reach 2 extends from approximately 200 feet east of R-023 (R- 23.2) to R-25.5. The Oceania Property defines the gap between Reach 1 and Reach 1. Additionally, we request the FDEP modify Specific Condition 1 of the Draft Joint Coastal Permit to reflect the modified project area. More specifically, we request that the Mean High Water Line Survey requirement of Specific Condition 1 exclude the Oceania Condominium property. Notice of Filing Request for Modification and Revised, Draft Joint Coastal Permit, Exhibit A. Revisions to the Original Draft JCP In light of the vote and based on the County's request, DEP filed a Revised Notice of Intent on July 26, 2010, which included revision of the Draft JCP (the "First Revised Draft JCP"). The First Revised Draft JCP eliminated the Oceania Beach Segment of Shoreline from the Project and took other action such as requiring the applicant to check for oil in the OK-A Borrow Area prior to construction by both visual inspection and analysis of sand samples because of the ongoing Deepwater Horizon Oil Spill in the Gulf. The revision also included changes to Specific Condition 5 of the Draft JCP.13/ On August 18, 2010, the Department gave notice of another revision of the JCP (the "Second Revised Draft JCP"). The Second Revised Draft JCP changed Specific Condition 1 of the JCP by eliminating the requirement that the County establish a pre-project MHWL prior to undertaking construction activities and instead requires the County to conduct a survey in order to locate an erosion control line ("ECL"). The revisions to the Draft JCP stirred interest in participating in this proceeding among a group of property owners who do not want the beaches along their properties restored: the MACLA Intervenors. The MACLA Intervenors and Their Properties On September 8, 2010, a petition to intervene (the "MACLA Petition to Intervene") was filed by nine putative intervenors: MACLA LTD II, a Limited Partnership ("MACLA"); H. Joseph Hughes as Trustee of the Betty Price Hughes Qualified Vacation Residence Trust ("Hughes Trust"); Kershaw Manufacturing Company, Inc. ("Kershaw"); Kayser Properties LLC ("Kayser"); Destin, LLC ("Destin"); Paul Blake Sherrod, Jr., and Cindy M. Sherrod ("Sherrods"); Blossfolly, LLC ("Blossfolly"); 639 Gulfshore, LLC ("639 Gulfshore"); and Laura Dipuma-Nord ("Nord"), (collectively, the "MACLA Intervenors.") All nine of the MACLA Intervenors own real property in the City of Destin within the Project area that fronts the Gulf of Mexico. All nine properties have the MHWL of the Gulf as their southern boundary. MACLA is a Texas Limited Partnership. Louise Brooker is its president. The address of its property is 620 Gulf Shore Drive. The Hughes Trust owns a one-third interest in real property at the address of 612 Gulf Shore Drive. H. Joseph Hughes is a trustee of the Hughes Trust. Kershaw is an Alabama corporation. The address of its property is 634 Gulf Shore Drive. The address of the Kayser property is 606 Gulf Shore Drive. The address of the Destin property is 624 Gulf Shore Drive. The address of the Sherrods' property is 610 Gulf Shore Drive. The address of the 639 Gulfshore property is 6346 Gulf Shore Drive. The address of the Blossfolly property is 626 Gulf Shore Drive. The address of Ms. Dipuma-Nord is 600 Gulf Shore Drive. The properties owned by the MACLA Intervenors are among 18-single family lots located between a rough mid-point of reference markers R-020 and R-021 and a rough mid-point of reference markers R-022 and R-023. See Ex. P-238. These 18 single-family lots are in the approximate middle of the Project. The Oceania property, eliminated from the Project at the time of the filing of MACLA Petition to Intervene, is just to the east of the 18 single family lots in which the properties of the MACLA Intervernors are located. (Reference marker R-023 is set along the shoreline adjacent to the Oceania property.) The MACLA Intevenors' properties and the Oceania property are within the area from R-020.3 to R-023.3 (the "Middle Segment", see discussion of Critically Eroded Shoreline, below). According to an evaluation conducted by the Department on January 7, 2009, the Middle Segment of the beach is one in which "[u]pland development is not currently threatened." Ex. P-238. Timeliness of the MACLA Petition to Intervene The MACLA Petition to Intervene was filed well after the commencement of the hearing. Under rule 28-106.205, because it was filed later than 20 days before the commencement of the hearing, it could only be accepted upon "good cause shown" or if the time for filing were "otherwise provided by law." The MACLA Petition to Intervene was also filed after the Department had entered an order dismissing petitions for administrative hearings filed by three of the MACLA Intervenors14/ to contest the Second Revised JCP. The order of dismissal with prejudice by the Department dated September 7, 2010, was entered on the following bases: First, the Petitioners had a clear point of entry to challenge the proposed permit after it was publicly noticed on January 9, 2010. The Petitioners failed to timely challenge the proposed permit when given the opportunity to do so. Second, it is well settled that any proposed modifications to a proposed permit made during the course of a de novo proceeding to formulate final agency action do not create a new point of entry. Accordingly, the Petition is dismissed without prejudice to amend. Petition to Intervene, filed September 8, 2010, Ex. A, at 2 of 8. The Department was aware that the Western Destin Project "because of its size, potential effect on the environment, potential effect on the public, controversial nature or location, is likely to have a heightened public concern or is likely to result in a request for administrative proceedings." Consolidated NOI, at 13 of 17. The Department therefore took pains to ensure that parties affected by the Western Destin Project would be provided notice of the Project and have an opportunity to timely assert their rights to challenge the permitting and authorization of the Project. The Consolidated NOI required publication within 30 days in the legal ad section of a newspaper of general circulation in the area a public notice of the Consolidated NOI. It also required proof of publication. The County complied on both counts. A notice was published on January 9, 2010, in the Destin Log, in Okaloosa County. The public notice specifically identified the project location as between reference monuments R-16.6 and R-25.5 in Okaloosa County, which includes the segment of the shoreline adjacent to the MACLA Intervenors Property. The Department also provided a detailed statement of the "Rights of Affected Parties," including their right to petition for an administrative hearing pursuant to sections 120.569 and 120.57 within 14 days of receipt of written notice of the Consolidated NOI. The point of entry into the administrative proceedings to challenge the Consolidated NOI, therefore, in the case of affected parties with notice by virtue of the publication on January 9, 2010, expired on January 23, 2010. The section of the Consolidated NOI that governed the rights of affected parties also warned: Because the administrative hearing process is designed to redetermine final agency action on the application, the filing of a petition for an administrative hearing may result in a modification of the permit or even a denial of the application. * * * The failure of any person to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S. Consolidated NOI, at 14 of 17. The MACLA Intervenors read the Destin Log at least on occasion and communicated with counsel for the Oceania Petitioners. Some believed they were represented by counsel for the Oceania Petitioners and had contributed to legal fees incurred by the Oceania Petitioners. Despite the foregoing, the MACLA Petition to Intervene was granted (subject to proof of standing) on the basis that the MACLA Intervenors had shown good cause for the filing after the deadline imposed by rule 28-106.205. At the time a point of entry into administrative proceedings was provided by the combination of the Consolidated NOI in December of 2009 and publication in the Destin Log of the notice on January 9, 2010, the Draft JCP called for the applicant to provide a survey of a Pre-project MHWL rather than the establishment of an ECL. Neither notice of the Second Revised Draft JCP, filed on July 26, 2010, nor the Second Revised Draft JCP, itself provided a point of entry into formal administrative proceedings to parties whose substantial interest were at stake. A new substantial interest, however, had been injected into the proceedings by the Second Revised JCP. The Second Draft JCP requires the establishment of an ECL as a condition of the permit in lieu of provision of a survey of Pre-project MHWL. The MACLA Intervenors promptly sought a point of entry to contest what is plainly a drastic change in circumstances with significant consequences to the boundary of their properties toward the shoreline with the Gulf of Mexico. The effect of this change and the difficulty of keeping up with beach restoration activities in Okaloosa County, particularly for affected persons whose permanent residence is elsewhere, was demonstrated by the testimony of Louise Brooker, who lives in Amarillo, Texas. When asked "[w]hy did you wait until September of this year [2010] to file the intervention?," she testified: [O]ur group thought that we were being represented by the Oceania group . . . when I did find out [the JCP had been issued], it was after the 30-day period . . . I hadn't been reading the Destin Log every day because it's very difficult to do, and then it changed. * * * Then it made a huge difference between using the mean high water line * * * And then the ECL being established, which was the ECL that I do not agree with, then that was being put in the permit. So that changed things a great deal. (emphasis added). Tr. 1526-7. Once their petitions for formal administrative proceedings had been dismissed with prejudice by the Department (or in the case of the MACLA parties whose petitions for an administrative had not been dismissed yet but appeared likely to meet the same fate), the MACLA Intervenors promptly sought relief through filing the MACLA Petition to Intervene. When the petition to intervene of the MACLA Intervernors was opposed by the County and the Department, the placement of the substantial interest at stake in the proceeding of a fixed ECL as the southern boundary of their property by the Second Revised JCP and the quick action of the MACLA Intervenors in contesting in contesting it was viewed as good cause for the filing of their petition later than required by rule. The Other Parties Okaloosa County is a political subdivision of the State of Florida and the applicant for the JCP, the Variances and the SSL Authorization. The Department is the state agency responsible for administration of the state's regulatory authority as found in Part I of the Beach and Shore Preservation Act, chapter 161, Florida Statutes, and in particular, for the issuance of permits required by section 161.041 and the concurrent processing of "joint coastal permits" as allowed by section 161.055. It also serves as staff to the Board of Trustees of the Internal Improvement Fund and in that capacity handles the processing and issuance of SSL Authorizations. The Holiday Isle Intervenors are businesses and condominium associations, all of whose members own real property or conduct businesses along the segment of the beach to be restored by the Project. Their properties (unlike the Oceania property and the MACLA Intervenors' properties in the Project "gap" between R-22.6 and R-23.2) are along shoreline that has been designated by the state as critically eroded.15/ Critically Eroded Shoreline Florida Administrative Code Chapter 62B-36 governs the Beach Management Funding Assistance Program. It contains the following definition of "Critically Eroded Shoreline": "Critically Eroded Shoreline" is a segment of shoreline where natural processes or human activities have caused, or contributed to, erosion and recession of the beach and dune system to such a degree that upland development, recreational interests, wildlife habitat or important cultural resources are threatened or lost. Critically eroded shoreline may also include adjacent segments or gaps between identified critical erosion areas which, although they may be stable or slightly erosional now, their inclusion is necessary for continuity of management of the coastal system or for the design integrity of adjacent beach management projects. Fla. Admin. Code R. 62B-36.002(4), (the "Critically Eroded Shoreline Rule"). The Department determines whether upland development, recreational interests, wildlife habitat or cultural resources are threatened or lost based on a 25-year storm event. Consideration of the Project on this basis leads to the Project being broken into three segments: a segment from R-17 at the west end of the Project to roughly R-20.3 (the "Western Segment"); a segment roughly between R-20.3 and R-23.2 (the "Middle Segment"); and a segment roughly between R-23.2 and R-25.5 (the "Eastern Segment"). Mr. Clark described the impact of a 25-year storm event on the Western and Eastern Segments: [T]hose two areas, based on the evaluation and the projection of the impact of a 25-year storm event, which is a high frequency storm event, showed that there would be erosion through deflation of the beach profile and recession of the shoreline to such an extent that upland development and infrastructure would be threatened. Tr. 499. As for the Middle Segment, "the same evaluation did not show that the 25-year storm event would provide that same level of threat." Id. The Middle Segment, however, for the purposes of continuity of the management and design integrity, was also designated as Critically Eroded Shoreline and the entire stretch of shoreline, including all three segments, Western, Middle, and Eastern, was originally included in the Project.16/ The Project With the elimination of the Oceania Gap, the Project calls for the placement of 831,000 cubic yards or so17/ of beach- quality sand along 1.7 miles (less the 600 feet of the Oceania Gap) of shoreline within the City of Destin between reference monuments R-16.6 and R-22.6 and between R-23.2 and R-25.5. The Project is designed to restore the shoreline to conditions that existed before Hurricane Opal in 1995. The useful life of the Project is estimated to be eight years. The Project will restore beach along 32 separate parcels of property, 31 of which are privately owned. The exception is a small area of publicly owned beach at the extreme west end of the Project. The Project's Construction is intended to be facilitated by hopper dredge. The dredge excavates at a borrow site. A ship brings the excavated material to the beach fill site where it is discharged by pipe onto the beach. The pipeline runs perpendicular to the shore and extends about a quarter of a mile offshore. The contractor normally fences off a work zone that is about 500 feet wide. The work zone moves along the beach as construction progresses. "[I]n that work zone, there is a lot of heavy equipment that moves the sand around . . . looking at the Project . . . [from] an aerial view, roughly half the sand will be placed seaward and half the sand . . . landward of . . . [the] Mean High Water Line." Tr. 139. The Project's construction template or "the shape of the beach when it[']s constructed," id., consists of a dune, a back berm and a wide variable berm. The dune has an elevation of 8.5 feet and a crest width of 30 feet. The berm has an elevation of 5.5 feet. The width of the construction varies but averages about 200 feet. Over the first several months following the Project's construction, a calibration process takes place. About half of the berm erodes and deposits offshore in a near shore sand bar. "That near shore bar acts as a wave break . . . and dissipates wave energy during storms. So having a good healthy bar out there can definitely provide storm protection." Tr. 140. "Using "two to 250 feet a day,"18/ as a "good approximation for the progress . . . [in] constructing the"19/ Project, construction on any particular individual property should take between one or two days "depending on how . . . wide the property is and how fast the construction progresses." Tr. 141. A property along a lengthier segment of the beach, like the 600 feet at the seaward boundary of the Oceania Property had it remained a part of the Project, therefore, would take "two to three days." Tr. 142. Storm erosion models on the construction berm showed that the Project will provide protection from a fifty-year storm. Selection of the Sand Source: Borrow Area OK-A The engineers of the Project, ("Taylor Engineering," the "Project's Engineers" or the "Engineers") examined the Gulf's underwater expanse from Santa Rosa County to Walton County seaward to Federal waters. The search for a sand source included a reconnaissance phase and a detail phase investigation of geophysical and geotechnical data. After exhaustive study, two potential borrow areas were identified: a "far-shore" site and a "near-shore" site. The far-shore site is eight miles offshore and about a mile east of East Pass and is designated "OK-B." The near-shore site, three miles west of East Pass and centered about a mile and a quarter from the shores of the Okaloosa Island part of Santa Rosa Island, is designated "OK-A." With its edge within the designated Outstanding Florida Water boundary of the Gulf Islands National Seashore Park, it is within a relic ebb tidal delta in water depths of -36 to -51 feet, NGVD. Approximately 1.7 miles wide from east to west and approximately 0.9 miles wide north to south, it covers approximately 700 acres. At its landward-most side, it will be dredged to 10 feet into the existing bottom. Reference in documents of Taylor Engineering and the County to OK-A as the "near-shore site" does not mean it is located in the "nearshore" as that term is used in coastal geology. The coastal geologic term "nearshore" refers to the zone from the shoreline out to just beyond the wave breaking zone.20/ Borrow Area OK-A is well beyond the nearshore. It is clearly located "offshore," in "the relatively flat zone that is located from the surf breakers seaward out to the outer limits of the continental shelf."21/ Tr. 513. It is referred as the near- shore site by Taylor and the County to distinguish it from OK-B which is farther offshore and therefore was referred to as the "farshore site." The two sites, OK-A and OK-B, were selected for comparative review on three bases: sand quality; financial impact; and dredging impacts. Sand quality is "the number one criteri[on]." Tr. 143. It involves grain size, soil and shell content, and sand color. Financial impact is determined mainly by distance; the farther from the construction site, the more expensive to transport the sand. If the borrow area is close enough to shore, a Borrow Area Impact Analysis is conducted. An impact analysis was not conducted for OK-B. The Engineers assumed on the basis of its 8 miles distance from shore that it would not impact the shoreline in any way. The assumption was a reasonable one. Impacts to the shoreline or beach from the dredging of OK-B are unlikely.22/ A Borrow Area Impact Analysis was conducted of OK-A. The quality of the sand in OK-B was similar to that of OK-A but OK-A's "was slightly better." Tr. 144. The slight difference was not a significant factor in the determination that OK-A should be selected. The main factor in favor of OK-A was distance. Because it is so much closer to the Project than OK-B, use of OK-A "substantially reduces the cost of construction" id., compared to OK-B. Taylor Engineering (and ultimately the County) selected OK-A as the sand source. The selection process included a sand source investigation by Taylor. Taylor Engineers' final report on sand source was released in October of 2009. The report shows that in OK-A, the southeast corner of the area "seemed to contain a lesser quality sand than the borrow area as a whole and in terms of color." Tr. 145. Sand from the southeast corner of OK-A, nonetheless, was used in two beach restoration projects, both on Eglin Air Force Base property. Those projects were denominated A-3 and A-13.23/ The selection of OK-A was not upset by Taylor Engineering's OK-A Borrow Area Impact Analysis. Borrow Area Impact Analysis An Okaloosa County Sand Search Borrow Area Impact Analysis was prepared by Taylor Engineering for the Joint Coastal Permit Application and released in July of 2008. Aware that dredging the borrow site could affect both wave climate and current (the swift flow of water within a larger body of water), Taylor examined the impact of dredging the OK-A Borrow Area for those effects in the borrow area vicinity. The ultimate purpose of the Borrow Area Impact Analysis, however, was larger. It was to determine the changes to wave and current climate for impact to the beach, such as erosion. An increase in wave height, for example, would increase erosion. Two numerical modeling efforts were conducted. The first, called STWAVE, documents the impacts to wave climate. The second, ADCIRC, analyzes the effects of the dredging on currents. The STWAVE model requires wave characteristics as input. Taylor Engineering used "a 20-year hindcast of wave data from a WIS station located directly offshore in deep water. Under STWAVE modeling, impacts were examined for normal conditions and then 'under a 100-year storm condition.'" Tr. 149. The basis was the 100-year storm data from Hurricane Opal. The impacts of bottom friction were ignored, a common practice in applications like the County's JCP application that involves work on the open coast with a uniform sandy bottom. As Mr. Trudnak put it: Tr. 150. When you use . . . wave monitoring devices, you're trying to calibrate a model for the effects of bottom friction. And when the borrow area is this close to shore [as in the case of OK-A], . . . the propagation of distance of the waves is relatively short. And when you have a uniform sandy bottom you don't expect the impacts of bottom friction to be significant. So . . . in applications like [Okaloosa County's for the Western Destin Project], you ignore the effects of bottom friction. The analysis assumed that all of the sand in the borrow area would be removed when, in contrast, "the borrow site usually contains 50 percent more sand than what the Project requires on the beach." Tr. 152. In the case of OK-A, it is intended to serve the Eglin Air Force Base Project, the Okaloosa Island Project and the Western Destin Project. These projects require 4.7 million cubic yards of sand of the nearly 7 million cubic yards of sand available in OK-A. The impact analysis, therefore, was conservative in that it predicted more impact than would actually occur because significantly less sand would be removed from the site than was factored into the STWAVE modeling. With regard to normal conditions, the STWAVE modeling led to the conclusion that impacts from the permitted activities associated with the borrow area would be negligible. Under storm wave conditions, the STWAVE modeling showed "a certain wave angle or direction that increased the wave height." Tr. 151. The increase in wave height, however, was far enough offshore so as to never affect the "actual breaking wave height on the beach." Id. The modeling results enabled Taylor Engineering to conclude "that the borrow area did not have a potential to cause any impacts whatsoever." Tr. 152. ADCIRC is a state-of-the art hydrodynamic model that simulates tidal currents. Taylor Engineering conducted the ADCIRC modeling to analyze effects on the tidal currents and circulation in and around East Pass that would be caused by dredging the borrow area. Just as in the case of STWAVE, ADCIRC modeling showed that the impact of dredging the borrow area would be negligible whether in normal or "storm" conditions. The Application Coastal Construction Permits and CCCL Permits The Application was processed as one for a joint coastal permit (a "coastal construction" permit under section 161.041). It was not processed as an application for a coastal construction control line ("CCCL") permit. Section 161.041 (the "Shore Protection Statute") and chapter 62B-41 apply to JCPs. Section 161.053 (the "CCCL Statute") and chapter 62B-33 govern CCCL permits. The Department treats its JCP and CCCL permitting programs as independent from each other and as mutually exclusive permitting programs. A project that involves "beaches and shores" construction is permitted under one permitting program or the other but not under both permitting programs. See Tr. 424-5. Indeed, when it comes to beach restoration projects (or "shore protection" projects) such as the Western Destin Project, section 161.053 of the CCCL Statute provides as follows in subsection (9): "The provisions of this section do not apply to structures intended for shore protection purposes which are regulated by s. 161.041 [the Shore Protection Statute] " The Department interprets section 161.053(9) to exempt the Project from CCCL statutory requirements and the rules that implement the CCCL Statutes so that the only permit the Project requires, in the Department's view, is a JCP. b. The "Written Authorization" Provision Chapter 62B-14 is entitled "Rules and Procedures for Applications for Coastal Construction Permits." The Shore Protection Statutes serves as rule-making authority for every rule in 62B-41. Every rule in the chapter, moreover, implements, among other provisions, one provision or another of the Shore Protection Statute. Rule 62B-41.008 derives its rule-making authority from the Shore Protection Statute and section 161.055(1) and (2). Among the statutory provisions it implements are four subsections of the statute: (1), (2), (3) and (4). Section (1) of rule 62B-41.008 provides, in pertinent part, as follows: A Joint Coastal Permit is required in order to conduct any coastal construction activities in Florida. A person required to obtain a joint coastal permit shall submit an application to the Department . . . The permit application form, entitled "Joint Application for Joint Coastal Permit, Authorization to Use Sovereign Submerged Lands, Federal Dredge and Fill Permit" . . . is hereby incorporated by reference . . . . The application shall contain the following specific information: * * * (c) Written evidence of ownership of any property which will be used in carrying out the project, or authorization for such use from the property owner which is upland of mean high-water, or below mean high water but not sovereign land of the State of Florida. * * * (n) Written authorization for any duly- authorized member of the Department staff to enter upon any property to be used in carrying out the project, for the purpose of evaluating site conditions prior to final processing of the permit application. (emphasis added). Rule 62B-41.008(2) (the "Waiver Provision") lists requirements of rule 62B-41.008(1) which are to be waived by the Department under circumstances described in the Waiver Provision: "Any of the requirements contained in paragraph 62B-41.008(1)(f), (h), (i), (j), (k), (l), or (m), F.A.C., will be waived if the Department determined that the information is unnecessary for a proper evaluation of the proposed work." In its list of requirements that will be waived under certain circumstance, the Waiver Provision does not include paragraphs (c) or (n). The Application did not contain the "specific information" detailed in paragraphs (c) and (n) of rule 62B- 41.008(1). It did not contain written proof of ownership of any property that will be used in carrying out the Project nor did it contain authorization for such use from the property owner upland of mean high-water, information required by paragraph (c). It did not contain written authorization for any duly-authorized member of the Department staff to enter upon any private property to be used in carrying out the Project for the purpose of evaluating the site conditions prior to final processing of the permit application, information detailed in paragraph (n). As of the dates of final hearing, the County had not provided the Department with any written authorizations from the owners of the 31 privately-owned properties within the Project area, including the MACLA intervenors. As part of the Application, however, the County requested a waiver of the requirements related to authorizations. A waiver was requested under number 14 of the Application. It provides: Satisfactory evidence demonstrating that the applicant has sufficient control and interest in the riparian upland property, as described in Section 18-21.004(3)(b), Florida Administrative Code. Governmental entities that qualify for the waiver of deferral outlined in this rule must provide supporting documentation in order to be eligible. If the applicant is not the property owner, then authorization from property owner for such use must be provided. Joint Ex. 1, at 3 of 9. The County, through its agent, Taylor Engineering, responded to number 14 of the Application as follows: Response: The applicants request a waiver of the requested information under Rule 18- 21.004(3)(b), which grants an exception to the upland interest requirement for restoration and enhancement (e.g. nourishment) activities conducted by a government agency. According to Rule 18- 21.004(3)(b), satisfactory evidence of sufficient upland interest is not required for the proposed activity, because the proposed offshore borrow area is not riparian to uplands and the beach fill activities will not unreasonably infringe on riparian rights. Joint Ex. 1, Attachment A, at 3rd un-numbered page. Rule chapter 18-21 governs Sovereignty Submerged Lands Management. Rule 18-21.004(3)(b) ("the Upland Interest and Riparian Rights Rule") provides as follows: (3) Riparian rights. * * * (b) Satisfactory evidence of sufficient upland interest is required for activities on sovereign submerged land riparian to uplands, unless otherwise specified in this chapter. * * * Satisfactory evidence of sufficient upland interest is not required . . . when a governmental entity conducts restoration and enhancement activities, provided that such activities do not unreasonably infringe on riparian rights. (emphasis added). Item number 18 of the Application calls for signatures related to "any proprietary authorizations identified above," such as those identified in item number 14. Consistent with the request for a waiver from providing the requested information with regard to satisfactory evidence demonstrating sufficient control and interest in the riparian upland property, no signatures were provided by the County or its agent. Rule 62B-49.003(3), entitled "Policy" provides: Any application submitted pursuant to this chapter shall not be deemed complete, and the timeframe for approval or denial shall not commence until the Department has received all information required for: a coastal construction permit under Section 161.041, F.S., and Chapter 62B-41, F.A.C.; an environmental resource permit under Part IV of Chapter 373, F.S., and Title 62, F.A.C.; and a proprietary authorization, under Chapter 253, F.S., and Chapters 18-18, 18-20 and 18-21, F.A.C. See the material bound and attached to the Request for Official Recognition filed August 2, 2010, Tab "Chapter 69B-49, F.A.C." The Department deemed the Application complete on December 30, 2009. Amendment of the JCP re: Written Authorizations The petition for formal administrative hearing filed in Case No. 10-0516 challenged the Consolidated NOI on the bases, inter alia, that the Application had failed to "provide 'sufficient evidence of ownership' as defined in rule 62B- 33.008(3)(c), F.A.C., to be a proper applicant for the Permit"24/ and that the County had not "provided satisfactory evidence of sufficient upland interest to be entitled to a letter of consent to use sovereign submerged lands."25/ To support their allegation that the County is not a proper applicant for the JCP, the Oceania Petitioners amended their petition on July 13, 2010, to add the following: The County must provide the Department "[w]ritten evidence of ownership of any property which will be used in carrying out the project, or authorization for such use from the property owner which is upland of mean high-water, or below mean high-water but not sovereign land of the State of Florida", as required by [paragraph (c) of the JCP Application Specific Information Rule]. The Department must receive "[w]ritten authorization for any duly-authorized member of the Department staff to enter upon any property to be used in carrying out the project, for the purpose of evaluating site conditions prior to final processing of the permit application", as required by Rule 62B- 41.008)1)(n), F.A.C. The Amendment was made despite the existence in all of the versions of the Draft JCP, the original version and the revised versions, of General Condition Six: This permit does not convey to the Permittee or create in the Permitee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the Permittee. The issuance of this permit does not convey any vested rights or any exclusive privileges. Joint Ex. III at Tab 9 at 4 of 26. With the filing of the Oceania Petitioners' Second Amended Complaint in Case No. 10-0516, the issues appeared to be fully joined. Before the case proceeded to hearing, however, the County voted to remove the Oceania Property from the Project (see paragraphs 31 and 32, above). The vote led to a formal request from the County to DEP to revise the Project and a revision by the Department of the Project's drawings and the Draft JCP (the "First Revised Draft JCP"), notice of which was filed on July 23, 2010. The revisions to the Draft JCP necessitated by the elimination of the Oceania property from the Project was not the only revision made to the Draft JCP as noticed on July 23, 2010. The Department also revised the Draft JCP's Specific Condition 5. This latter revision prompted the Sherry Petitioners to file a petition for an administrative determination concerning un- adopted rules. DOAH assigned the petition Case No. 10-6205RU. During the final hearing, the Department revised the Draft JCP a second time (the "Second Revised Draft JCP".) The second revision inspired the MACLA Petitioners' petition to intervene. Just as with the Sherry Petitioners, the revision to Specific Condition 5 prompted the MACLA Petitioners to petition for an administrative determination concerning un-adopted rules. DOAH assigned this second un-adopted rule challenge to Specific Condition 5 Case No. 10-8197RU. Case Nos. 10-6205RU and 10-8197RU In general, the revision to the Draft JCP's Specific Condition 5 advised the County that no beach restoration work can be performed on private upland property unless authorization from the owner of the property has been obtained and submitted to the Department ("the Upland Property Authorization Requirement"). The revision also provided an exception to the Upland Property Authorization Requirement: the County could submit an authorization from a court of competent jurisdiction that such an authorization is not required. Case Nos. 10-06205RU and 10-8197RU were heard at the same time as these consolidated cases.26/ A final order was issued with regard to the two cases on November 4, 2010. The final order dismissed the case because the Sherry Petitioners and the MACLA Petitioners had not demonstrated that they would be "substantially affected" by Specific Condition 5 as required by section 120.56(3) for a party to have standing to challenge an agency statement that constitutes a rule which has not been adopted pursuant to the rule-making procedures found in section 120.54(1)(a). Case Nos. 10-6205RU and 10-8197RU were two of three petitions seeking administrative petitions concerning un-adopted rules that were consolidated and heard with the consolidated cases subject to this Recommended Order. The third was a case that had been filed by the Oceania Petitioners earlier in the proceeding: Case No. 10-5384RU. Case No. 10-5384RU Case No. 10-5384RU was filed by the Oceania Petitioners in order to challenge as an un-adopted rule Specific Condition 1 as it appeared in the Original Draft JCP ("Original Specific Condition 1"). Original Specific Condition 1 contained several requirements. In general, it required the County to record a certificate before the commencement of construction associated with the Western Destin Project. The certificate was required to describe all upland properties along the shoreline of the Project. The certificate was also required to be accompanied by a survey of a pre-project mean high water line (the "Pre-project MHWL) along the entire length of the Project's shoreline. The case claimed that the Department had made another statement that constituted an un-adopted rule which violated the rule-making provisions of chapter 120: "that an Erosion Control Line (the 'ECL') is not required to be established pursuant to Section 161.161, Florida Statutes, for a beach restoration project unless 'state funds' are used for the construction (as opposed to just the design) of a beach restoration project." Case No. 10-5384RU, Petition for an Administrative Determination Concerning Unadopted Rules, at 2. During the course of the final hearing, however, the Department filed a notice of a set of revisions to the First Revised Draft JCP. These revisions (the "Second Revised Draft JCP") included a revision of Specific Condition 1. The Second Revised Draft JCP The notice by the Department that alerted the parties to the Second Revised Draft JCP was filed on August 18, 2010. The August 18, 2010, Notice contains two changes to the First Revised Draft JCP. The first change deletes entirely the existing language in Original Specific Condition 1 (the language challenged in Case No. 10-5384RU). It substitutes the following language: Prior to construction of the beach restoration project, the Board of Trustees will establish an Erosion Control Line along the shoreline of the beach restoration project. The Erosion Control Line shall be established consistent with the provisions of ss. 161.141-161.211, Florida Statutes. An Erosion Control Line shall not be established in conjunction with this joint coastal permit with respect to the shoreline seaward of the Oceania Owner's [sic] Association, Inc. members' common elements property. In lieu of conducting a survey, the Board of Trustees may accept and approve a survey as initiated, conducted, and submitted by Okaloosa County if said survey is made in conformity with the appropriate principles set forth in ss. 161.141-161.211. Department of Environmental Protection's and Board of Trustees of the Internal Improvement Fund's Notice of Revisions to the Proposed Joint Coastal Construction Permit, page 3 of 4. Thus, the first change noticed by the Department on August 18 deleted the requirement that the County submit a survey of a Pre-project MHWL. It requires, instead, that the county establish an ECL consistent with applicable statutory provisions. The second change was made with respect to Specific Condition 4(c) of the First Revised Draft JCP, which lists items to be submitted to the Department for approval prior to the commencement of construction and the issuance of a Notice to Proceed (with construction) by the Department. The existing language was deleted in its entirety and the following language was substituted: Id. Written documentation that the Erosion Control Line required by Special Condition Number 1 has been filed in the public records of Okaloosa County. Disposition of Case No. 10-5384RU The same Final Order that disposed of Case Nos. 10- 6205RU and 10-8197RU disposed of Case No. 10-5384RU. The Petitioners in Case No. 10-5384RU were found to lack standing to challenge Original Specific Condition 1 and the petition that initiated the case was dismissed. In addition, the Final Order concluded that had the Petitioners had standing to bring the challenge, the case would still have been decided in favor of the Department. This conclusion was based on the remedy called for by section 120.57(1)(e).27/ That remedy was found to have been achieved when the Department changed Specific Condition 1 to require an ECL rather than a Pre-project MHWL. See Final Order, Case No. 10- 5384RU (DOAH November 4, 2010). In addition to the record made with regard to the three rule challenges during the final hearing on the Sherry and Oceania Petitions, most of the rest of the evidence at the final hearing concerned the application of the regulatory authority of the Department and the Board of Trustees found in the Florida Statutes and the Florida Administrative Code, especially the environmental impacts of the Project as permitted by the Second Revised Draft JCP and as authorized under the Variance and the Sovereign Submerged Lands Use Authorization. Impacts The depth of OK-A should not exceed -49.4 feet, NGVD in an area where the depth of the ocean bottom is roughly -40 feet, NGVD. The excavation of the borrow site is designed in two dredging phases. The first phase, anticipated to provide up to 116 percent of the sand needed by the Project, is designed to a depth of 47.4 feet. "If for some reason, the contractor needs more sand . . ., then he can move into Phase II . . . [at a depth] of minus 47.4 to minus 49.4 feet [NGVD]. . . [,] a two foot deep layer throughout the entire borrow area." Tr. 165. OK-A is relatively wide, at least as compared to an existing borrow area not far away, the borrow area used for beach restoration in western Walton County and eastern Okaloosa County east of the City of Destin (the "Walton Borrow Area"). It is also a shallow borrow area when its depth is measured from the Gulf floor. It is in deeper water than the Walton Borrow Area. These factors make it less likely to cause impacts to the beach than the Walton Borrow Area.28/ Despite the width of OK-A, its relative shallowness measured from the Gulf floor, and its water depth, Dr. Dally, on behalf of the Petitioners, challenged the Taylor Engineering conclusion that there would be no impacts to the beach from the dredging of Borrow Area OK-A. The challenge from Dr. Dally, however, did not detail what the impacts would be or how serious they would be. Instead, Dr. Dally concluded that "not nearly enough study has been conducted of the proposed borrow area to ascertain that there will be no adverse impacts." Tr. 633. Dr. Dally's challenge to the conclusion by Taylor Engineering of no impacts to the beach from an excavated OK-A begins with an explanation in general of wave dynamics, sediment transport, and borrow site impacts. Wave Dynamics, Littoral Sediment Transport, and Borrow Site Impacts, Generally General Wave Dynamics "[W]aves in very deep water will start to turn and become more shore parallel in the case of Okaloosa County." Tr. 636. As they approach shore, a dynamic process of shoaling and refraction occurs. The waves may also become involved with diffraction. Shoaling is a growth in height from interaction with the shallow bottom or a shoal. Refraction is a process of alignment of waves with bottom contours. Diffraction is a spreading of waves or the bending of waves or change in wave direction after interaction with emergent structures or submerged features. As the process of shoaling, refraction and diffraction takes place, waves may be affected by bottom friction, depending on ocean bottom conditions. Dr. Dally offered the following description of wave changes as they close in on the face of the beach and approach interaction with the shoreline. The description includes the potential impacts of an excavated OK-A on the beaches and shores of Okaloosa Island adjacent to the Surf Dweller and El Matador condominium property: As they pass into the very nearshore . . . they, of course, grow in height. They then break . . . [or] [s]ometimes, as they pass over a [sand]bar, they'll stop breaking. And then begin breaking again when they get right up onto the beach face. Any time you put a bathymetric feature [such as a borrow area] into that otherwise natural system, you affect the wave transformation due to processes dependent upon the character of the perturbation . . . * * * Wave reflection from abrupt bathymetric changes. . . in this case, the landward most . . . notch of the borrow area would be a reflective surface . . . when something has perturbed the wave field like that, defraction [sic] becomes an important process. So, as the waves pass over this proposed borrow area and, especially, over the 10-foot or greater vertical face, they will reflect and begin defraction [sic] so that it becomes a . . . complicated wave field . . . . Tr. 636-7. In addition to the perturbation caused by the borrow area there is another factor at work that has the potential to affect the beach along the condominium properties owned by the Sherry Petitioners: sediment transport. Sediment Transport "Sand can move along or away from the beach in two ways." Tr. 1141. It can move along the shoreline or it can move offshore. Littoral transport of sediment, a factor important to erosion and accretion, is the movement of sediment, mostly sand, along or parallel to shore. It is caused by the intersection of waves that come ashore at an angle to the shoreline, rather than those that break straight onto the beach. The average net long-term littoral transport in the area of the Project and Okaloosa Island is east to west. The Sherrys and Mr. Donovan Petitioners own property down-drift from the OK-A site, or to the west. Dr. Young described the beaches down-drift of OK-A at hearing: "[t]hose beaches have, over the . . . last decade or so, been generally stable to accreting. There's a pretty nice beach out there right now." Tr. 1143. This area of the Okaloosa County's beaches and shores is the area most likely to be affected by an excavated OK- A if there are, in fact, any impacts to beaches and shores caused by the dredging of the borrow site. Borrow Site Impacts Two processes affecting waves in the Gulf would occur above an excavated OK-A Borrow Area. The first wave process would be "that part of the wave energy will actually reflect and go back out to sea," tr. 640, in essence, a scattering effect of the energy. Diffraction at the same time would cause the waves to radiate outwards from the borrow area rather than the waves going straight back out to sea. The second wave process creates the potential for the waves to become "very, very, complicated." Tr. 640. They could "trip", that is, the notch in the borrow area could break the waves. "[B]rag scattering" (tr. 641) could make the waves deteriorate into shorter period waves. If there are changes in waves, tide level or current, changes will be caused to the beach. As Dr. Dally succinctly put it at hearing, "[the beach] might erode, it might accrete, it might do both," tr. 641, by virtue of the presence of an excavated OK-A Borrow Area. If the impact of the excavation of the borrow area were to create shorter period waves, the result generally would be erosion. If the impact created longer period waves which generate water movement deep into the water column the result generally would be accretion. The borrow area has the potential in Dr. Dally's opinion to create both longer and shorter period waves. Wave angle of the waves breaking on the beach also is a factor in beach impacts. But Dr. Dally was unable to predict the impacts of the excavation of OK-A to Okaloosa Island beaches and shores without more study, data and analysis as to what effects a dredged OK-A would have on wave period and wave angle and the concomitant sediment transport. Just as Mr. Trudnak, Mr. Clark concluded that OK-A is too far offshore to cause adverse impacts to the beach. If, however, the Project were to utilize a borrow area along the same stretch of the beach but much closer to shore as in the case of the Anna Maria Island Project in which the borrow area was only 1000 feet from the shoreline, erosion impacts could occur on part of the beach. Beneficial impacts in such a case would occur to the beach downdrift of the borrow area. In the Anna Maria Island Project, beaches far enough to the south which were downdrift of the borrow area accreted. The impact to the Sherry and Donovan Properties, both being downdrift of a borrow area located along the same stretch of beach but within 1000 feet of shore and closer in than OK-A, would likely be beneficial. The area of shoreline that would be affected by wave impacts from an excavated OK-A is larger than the area in the immediate shadow zone of the borrow site, that is, a shadow zone perpendicular from the borrow site to the shore. The area affected by wave impacts depends on the angle of the waves. In the Destin area and along Okaloosa Island where the Sherry Petitioners reside, the waves come ashore predominately out of the east. If the waves come ashore along Okaloosa Island at a strongly oblique angle (more directly from the east), "the shadow zone now stretches further to the west and the diffraction pattern . . . increases the size of the shadow zone," tr. 680, to a size much larger "than the actual shadow zone of the . . . borrow area." Id. Along these same lines, if there are impacts to the beach caused by a dredged OK-A, the impacts should be greater the closer the beach is to the footprint of a dredged OK-A. Given the predominate tendency of the waves to come from the east along Okaloosa Island, if the beaches alongside both the Surf Dweller Property and the El Matador Property are affected, the beach alongside the Surf Dweller Property will incur the greater impact. Likewise, if beach impacts are incurred by beach alongside only one property or the other, it is much more likely that the beach alongside the Surf Dweller Property will be affected than the beach alongside the El Matador Property. Distance of an offshore borrow area from the shore is critical to the effect of the borrow area on diffraction and wave dynamics. If the borrow area is far off shore, as in the case of the alternative, potential borrow site identified by Taylor Engineering, OK-B, then, as explained by Dr. Dally, diffraction "has a lot of time and a lot of opportunity to smooth the waves out once again and things become uniform when they hit the beach." Tr. 645. A borrow area that is closer to the beach has higher potential for creating impacts. Dr. Dally again: "[I]f you move the borrow area closer to the beach, you have this scattering pattern induced by the reflection and the diffraction and refraction that doesn't have time to smooth itself out. And that's when you can really cause impacts to the beach, both accretive and erosive impacts." Id. (emphasis added). The underscored sentence from Dr. Dally's testimony quoted in the previous paragraph was directly addressed in the County's case through Mr. Trudnak's determination that OK-A, although not as far away as OK-B, is far enough away from the beach that it will not cause adverse impacts to the beach. Again, Dr. Dally's testimony, despite the underscored testimony in the previous paragraph, is not that OK-A will, in fact, cause impacts to the beach. His testimony, rather, is the equivalent of a statement that the closer a borrow area is to the beach the more likely that it will have impacts to the beach and that at some point, a borrow area, will be so close to the beach, that adverse impacts will occur. The fact that OK-A is much closer to the beach than OK-B does not mean that an excavated OK-A will cause impacts to the beach. Impacts of an excavated OK-A depend upon OK-A's actual distance from the beach rather than OK-A's distance relative to OK-B's distance. Thus, while it may be determined that the likelihood of impacts to the beach is greater in the case of OK-A than in the case of OK-B, actual impacts from OK-A to the beach (as far as the effect of distance) is a function of OK-A's actual distance from the beach without regard to OK-B's distance from the beach. In addition to Dr. Dally's certitude that there will be impacts to the beach by virtue of the presence of a dredged OK-A, Dr. Dally also took issue with the method by which Taylor Engineering reached the conclusion of no impacts in the OK-A Borrow Area Impact Analysis Report. The OK-A Borrow Area Impact Analysis Generally Mr. Trudnak was part of the Taylor Engineering team that prepared the Borrow Area Impact Analysis Report. Mr. Trudnak was not the only expert to defend the report's conclusion of no impact to the beach. The report was reviewed by Mr. Clark, the Department's expert, who also opined that there would be no impacts. Mr. Clark relied on more than the report for his opinion. He also relied on his extensive experience with beach restoration projects and monitoring data for those projects and visual observation of those projects post-construction. The only numerical data analysis specific to the excavation of the OK-A Borrow Area, however, that the Department used in determining that excavation of OK-A would not have any adverse impacts to the shoreline and coastal systems of Okaloosa Island was the Taylor Engineering OK-A Borrow Area Impact Analysis Report. The Report described its evaluative efforts: [T]his report evaluates two potential dredging templates in terms of their impacts on wave and tidal current patterns during normal and extreme conditions. The evaluation requires analysis of the wave climate and tidal currents before and after the borrow area dredging. The analysis required a balance between minimizing impacts to wave climate and current patterns, and providing acceptable nourishment volumes. STWAVE (Steady-State Spectral Wave Model) simulated normal (average) and extreme (100- year (yr) storm) waves propagating over the baseline and post-dredging bathymetries. ADCIRC hydrodynamic modeling simulated tidal flow over the baseline and post-dredging bathymetries for normal (spring) and extreme (100-yr storm) tide conditions. A comparison of the baseline and post dredging model results established the effects of borrow area dredging on the neighboring shorelines (Destin and Eglin AFB) and the inlet. County Ex. 1, Okaloosa County Sand Search Borrow Area Impact Analysis, at 6. Thus, the STWAVE modeling conducted by Taylor as part of the analysis attempted to simulate normal (average) and extreme (100-year storm) waves propagating over the baseline and post-dredging bathymetrics. Taylor Engineering relied on WIS (Wave Information Study) results in performing its STWAVE modeling. WIS data is not measured wave data. Instead, it consists of numerical information generated by specific stations in wind fields in various locations around the Gulf of Mexico. The data is then placed in a model coded to represent the entire Gulf. The WIS station from which data was collected by Taylor Engineering is located approximately 10 miles offshore where the depth is approximately 85 feet. It would have been preferable to have used comprehensive field measurement, that is, data obtained from wave gauges on both sides of the borrow area over enough time to support use of the data, rather than WIS data. Comprehensive field measurement would have produced much more information from which to predict impacts to the beach. As Dr. Dally explained, however, If you don't have [field measurement data], then . . . especially over the long-term . . . a year or more [or] if you're analyzing your beach profile data over a 10 year period, you would like to have . . . wave data to accompany that 10 year period. Generally we don’t and that's when we start relying on models to fill in this missing information. Tr. 645-6 (emphasis added). This testimony was consistent with Mr. Trudnak's testimony: the problem with field measurement is that "the useful data that you [get] from [field measurement] gauges is . . . limited to [the] deployment period." Tr. 1234. It is not practical to take 10 years' worth of field measurement. As Mr. Trudnak explained: Typically, you would install those gauges for . . . a month or a couple of months . . . you want to use representative conditions . . . you try to pick a winter month and a summer month so you can try to capture those extremes and wave conditions. * * * [W]hen you . . . install those gauges in the field, you have no idea what those conditions are going to be during your deployment period. You can install your wave gauge for a month in the winter but that can be an unusually calm month, it could be an unusually severe month. So, it's really hit or miss, whether you . . . capture representative conditions. Id. (emphasis added). The WIS information utilized is hind-casted. Hind- casting is a method for developing deepwater WIS data using historic weather information to drive numerical models. The result is a simulated wave record. The WIS information utilized includes 20 years of hind-cast information. The purpose of using such a lengthy period of information is that it ensures that representative conditions are captured in the data for purpose of the analysis. Such "lengthy period" information overcomes the concern that there is not enough data to capture representative conditions as in the case of typical field measurement data. For its extreme STWAVE modeling, Taylor relied on WIS information generated during Hurricane Opal in 1995. Analysis of the model results showed negligible impacts on wave height under normal conditions and increased wave height during extreme conditions. Increased wave height during extreme conditions, however, was no closer than 300 feet from the shoreline. The increased wave height and wave angle in storm conditions were far enough offshore that they "never impacted the actual breaking wave height on the beach." Tr. 151. The model's prediction of no impacts in wave height on the shoreline due to a dredged OK-A and no change in sediment transport rate by virtue of the presence of a dredged OK-A led Taylor Engineering to conclude that whether in normal or extreme conditions, a dredged OK-A Borrow Area would not cause impacts to the beaches and shores of Okaloosa County. Criticisms of Taylor's STWAVE Modeling Dr. Dally offered four basic criticisms of Taylor Engineering's STWAVE Modeling: a) the model did not account for wave transformation processes caused by bottom friction between the WIS Station (10 miles out in the Gulf) and the OK-A site; b) the model was not calibrated or verified; c) the model did not sufficiently account for wave transformation impacts from the dredging of Site OK-A; and d) Taylor did not plot wave direction results from its STWAVE models or conduct any sediment transport analysis. Mr. Trudnak offered refutations of the criticisms. For example, taking the first of them, wave transformation processes caused by bottom friction between the WIS Station and the OK-A site were not accounted for by Taylor Engineering in its analysis because "most of that distance [between the WIS Station and the OK-A site] is deep water, meaning the waves aren't . . . feeling the bottom so they're not being affected by the bottom friction." Tr. 1236. The refutations were not entirely successful. The second of Petitioners' experts, Dr. Young cast doubt on the validity of all modeling no matter how well any particular modeling activity might meet the criticisms leveled by Dr. Dally against Taylor Engineering's effort. Dr. Young accepted Dr. Dally's testimony about why Taylor Engineering's modeling were not sufficient to support an opinion of "no impacts", but he differed with Dr. Dally as to whether coastal engineering models should be utilized to predict impacts to beaches.29/ See Tr. 1157. Dr. Dally believes in the benefits of modeling as long as the modeling is conducted properly. Dr. Young does not. It is his opinion that no model produces a projection that is precisely accurate but the essence of his criticism is that "we don't know how wrong the models are." Tr. 1159. Models are "incapable of quantifying the uncertainty or how right or wrong that they might be." Id. With regard to the modeling used in Taylor's Borrow Area Impact Analysis, Dr. Young summed up: [W]hen we do this model run, especially with a model that isn't calibrated or verified, we get an answer . . . it's not precisely the right answer, but . . . nobody knows how wrong the answer is. I don't know it, Mr. Trudnak doesn't know and Mr. Clark doesn't know. And that's why being prudent is important and why relying on the monitoring data is critical because the monitoring data is real data. Tr. 1160. In contrast to Dr. Young, Dr. Dally, consistent with his faith in models appropriate for the investigation and conducted properly, took another tack in attacking the modeling used by Taylor Engineering. He criticized Taylor Engineering's failure to use a more comprehensive wave transformation model: the Boussinesq Model. Dr. Dally opined that the Boussinesq Model was superior to STWAVE principally because it takes diffraction into account. But Petitioners did not produce any off-shore Borrow Area Impacts Analyses which used the Boussinesq Model, and Mr. Trudnak testified that he was unaware of any.30/ Taylor Engineering used STWAVE and not Boussinesq as the model for the Borrow Area Impact Analysis because the Boussinesq Model is typically used where diffraction plays the dominant role, that is, within areas like inlets or ports which have structures that will cause wave perturbation. The open coast is not such an area, making the STWAVE Model, if not more appropriate than the Boussinesq Model, certainly an acceptable model under the Project's circumstances. When asked about the Bousinessq modeling's application in the context of his testimony that he could not say what would be the impacts of the dredging of the OK-A Borrow Area, their extent or whether they would be adverse, Dr. Dally testified that based on his experience (rather than actual testing or modeling the impacts of OK-A as done by Taylor), he was "almost certain," tr. 691, that Bousinessq modeling would show impacts to the beach adjacent to the Surf Dweller and El Matador Properties that could be a "type of accretion . . . [that is] momentary . . . due to the propagation of these features as they go up and down the beach." Id. This statement is consistent with Mr. Clark's opinion that if the Project's borrow area were within 1000 feet of shore, the impact of dredging OK-A to the Sherry and Donovan Properties would be beneficial. When asked if the beaches would develop scalloping (sand erosion in some areas and accretion in others), Dr. Dally said, "Right. This [wave transformation process caused by an excavated OK-A borrow area] makes a scalloping." Tr. 692. Perhaps the dredging of Borrow Area OK-A would aggravate scalloping along the shores of Okaloosa County but they would not create scalloping of an "un-scalloped" coastal system. Scalloping features in the Okaloosa Island portion of Santa Rosa Island existed at the time of final hearing. In short, Dr. Dally roundly criticized Taylor Engineering's STWAVE modeling. As to the impacts he was sure would occur, he was unable to state whether they would be adverse, beneficial or both. Most importantly to the weight to be assigned his testimony, he was unable to testify as to how significant the impacts would be; one cannot determine from his testimony whether the impacts will be entirely de minimus, see rule 62B-41.002(19)(c) or whether some could be significant, see rule 62B-41.002(19)(a). Dr. Dally's testimony with regard to the creation by the Project of scalloping did not indicate the significance of that scalloping to the coastal system of Okaloosa County, a system whose ocean bottom, beaches and shores already contain scalloped features. Suppositive impacts that would be caused by the Project to the beaches of Okaloosa County were not the only attack by Petitioners. They also challenged the impact analysis on the basis of the opinion that adverse impacts had been caused to beaches by another beach restoration project and its borrow area not far away: the Walton Project. The Walton Project and Its Borrow Area Completed in the late spring of 2007, the Walton Project placed sand dredged from the Walton Borrow Area on approximately 7 miles of beach in eastern Okaloosa County (East Destin) and western Walton County. Just as in the case of the Western Destin Project, Taylor Engineering performed a borrow site impact analysis for the borrow site used in the Walton Project. Location and Comparison to the OK-A Borrow Area The northwest corner of the Walton Borrow Area is roughly 2.75 miles from the northernmost point of the western boundary of the OK-A Borrow Site. See Ex. P-13. The area between the easternmost point of the OK-A Borrow site and the westernmost point of the Walton Borrow Area, therefore, is roughly half that distance or 1.375 miles. The northwest corner of the Walton Borrow Area is approximately 0.8 miles offshore; its easternmost point is roughly one-half mile off-shore. Comparison of the Walton Borrow Area and OK-A shows that OK-A is larger and will have more sand removed. It is also wider, shallow when measured from the Gulf floor, and in deeper water than the Walton Borrow Area. Nonetheless, Petitioners characterize the two borrow sites as similar,31/ mainly because with less than 1.5 miles separating them, they are relatively close to each other. Despite proximity, there are significant differences, however, between the two. A wider, less deeply dredged borrow area would have less impacts than one deeper and narrower. OK- A's location in deeper water makes it less likely to affect waves and current than the Walton Borrow Area. The footprints of the borrow areas are dissimilar. The Walton Borrow Area has an irregular shape. OK-A is in the shape of a rectangle with a uniform dredging depth although "the depth of sand that is dredged will taper off . . . further offshore . . .[s]o that the seaward most edge does not have significant thickness of sand. The maximum cut is towards the northern boundary." Tr. 306. In addition to distance from shore, the predominately significant difference between the two is the presence on the Gulf floor in the vicinity of the Walton Borrow Area of an ebb shoal: a large deposit of sediment. The ebb shoal exists because of interaction between East Pass and the waves, tides and currents of the Gulf. The Walton Borrow Area is "close to the East Pass ebb shoal . . . and it included the outer flanks of the ebb shoal." Tr. 155. It makes the littoral zone for the Walton Project more active than the littoral zone near which OK-A is located. Located a significant distance to the west of the East Pass ebb shoal, OK-A would not interact with its littoral zone in the way the Walton Borrow Area interacts with its littoral zone. Walton Borrow Area Impact Analysis and Monitoring Taylor Engineering's borrow area impact analysis for the Walton Borrow Area was similar to the impact analysis for OK-A in that both consisted of "wave models and hydrodynamic models." Tr. 156. The Walton impact analysis showed "one potential impact area about 2,000 feet long [on the beach] just west of East Pass," id., an impact area also described as extending from approximately 3,000 to 5,000 feet west of the westernmost jetty at East Pass. It anticipated that impact would be caused by wave action due to the perturbation resulting from the presence of the dredged Walton Borrow Area. The potential impact was projected by the analysis to be a reduction in the sediment supply to the beaches west of East Pass by 11,000 cubic yards per year. Because of that reduction, DEP included a mitigation condition in the Walton Project permit: placement of 55,000 cubic yards on the impacted beach. As a condition of the Walton Project, Taylor Engineering conducted monitoring of the impacts to the beach from the project in general and in particular from the Walton Borrow Area. At the time of hearing, reports for 2007, 2008, and 2009 had been completed and the engineering firm was working on the 2010 report. Mr. Trudnak described the results from the monitoring through 2008 at hearing. From the period of pre-construction in 2006 through immediate post-construction, the monitoring revealed "a huge volume of erosion." Tr. 159. Subsequent analysis from 2007 to 2008 revealed "a huge amount of accretion that actually exceeded the amount of erosion from the previous year." Id. The volumes of erosion and accretion "seemed abnormal." Id. The bottom line, however, of the two years of data is that the early erosion was more than countered by the accretion that occurred into 2008. After describing the impacts in the first two years of monitoring, Mr. Trudnak stressed the importance of what was revealed by additional monitoring. "[M]ore important is the long term trend . . . ." Id. From 2006 through 2009, the monitoring area "as a whole, actually accreted, it gained sand." Tr. 160. Determining the impacts to the beach caused by the Walton Project is complicated because of impacts caused by behavior of the beach at the time of construction and earlier. Consistent with the Department's "critically eroded" designations, data from March of 1996 (not long after Hurricane Opal), data from June, 2004 (before Hurricane Ivan) and 2006 pre- construction data showed the shoreline adjacent to the Walton Project Area to have been receding landward at a rapid rate. This "background" erosion is due mainly to the effects of tropical storms. In the wake of the dredging of the Walton Borrow Area it was difficult for Taylor Engineering to determine what impacts were caused by "background" erosion due to tropical storms and what impacts were caused by the dredging of the Walton Borrow Area. In contrast, it is not difficult to determine from monitoring data in the three years after construction of the Walton Project, however, that the beach west of the borrow area has accreted and that this appears to be the long-term trend. Tr. 159. Contrary to conclusions Petitioners would have drawn from the evidence presented by their experts, the more comprehensive data indicates that the Walton Project (including its borrow area) is having a beneficial impact on the beaches to the west of the project and its borrow area. Dr. Young opined on behalf of Petitioners that the problem with the OK-A Borrow Area Impact Analysis is that it is based on modeling which is far inferior to "real world" data. His opinion that actual data is superior to data generated by modeling, no doubt, is sound. The only "real world" data that will prove any impacts for sure, whether adverse or beneficial, from a dredged OK-A, however, is after-the-fact monitoring data. Such data is usually obtained annually after the construction of a project or after major storm events. It consists of obtaining near-shore and offshore monitoring profiles and involves determining shoreline changes and volumetric beach changes.32/ In the absence of data from monitoring impacts of a dredged OK-A, Dr. Young opined that the data derived from monitoring the Walton Borrow Area which showed erosion early after completion of the Project is superior to the modeling data reviewed by Taylor Engineering in predicting impacts to Santa Rosa Island beaches. There are two problems, however, with Dr. Young's conclusion. First, beach impacts after the dredging of the Walton Borrow Area do not necessarily support similar impacts from a dredged OK-A because the two borrow areas are materially different. Second, the trend revealed by the more comprehensive data gathered in the wake of the dredging of the Walton Borrow Area is that the beach is receiving impacts which are beneficial. Reasonable persons might differ as to the outcome of reasonable assurances with regard to impacts based on the testimony of Mr. Trudnak and Drs. Dally and Young. The balance, however, swings clearly in favor of the applicant in consideration of the testimony of Ralph Clark. Mr. Clark and The Department's Review of Western Destin Project Borrow Site Impacts Ralph Clark is a Registered Professional Engineer in Florida. The recent recipient of the Stan Tate Award from the Florida Shore and Beach Preservation Association, a lifetime achievement award for work over the years in beach preservation, at the time of hearing, Mr. Clark had worked for 37 years for the State of Florida as a coastal engineer. During his long career, Mr. Clark has worked on the State's two separate regulatory programs in the arena of beach management: a "Wet Beach Program, which is working below Mean High Water and includes projects such as beach restoration" tr. 485, and "the more dry beach program which involves construction seaward of Coastal Construction Control Lines and activities landward of Mean High Water . . . ." Id. He has been involved with the Department's Beach Management Program, a grants program for cost-sharing with local governments to develop a long-term comprehensive management plan for the state to solve critical impact problems around Florida which may include erosion. He has conducted or prepared the Critically Eroded Beaches Report every year "going back to the late 1980's" id., and he has "conducted Beach Erosion Studies and Storm Damage Impact Investigations around the State for the past four decades." Tr. 486. Among his specific duties is the review of "scopes of work and project feasibility studies that are provided . . . by the [Department's] Beach Management Section." Id. In this capacity, Mr. Clark conducted the Department's engineering review of the Western Destin permit application and additional information related to the Project. After review, Mr. Clark reached the conclusion that the "Project is a well designed Beach Restoration Project that's critically needed . . . to restore the beaches of Western Destin to provide needed storm protection, recreational benefits and wildlife habitat." Tr. 488. With regard to his overall conclusion as to the Project's physical impacts, Mr. Clark testified: Id. In my opinion, the placement of 831,000 cubic yards of beach compatible sand fill along Western Destin will provide a positive, beneficial impact to the beach and dune system of Western Destin. The excavation of that material from the proposed borrow area [OK-A], along with the excavation of material for four other fill projects proposed for Santa Rosa Island, three of which have been approved, is not expected to have any adverse impact to the beaches of Santa Rosa Island. Mr. Clark's opinions that the Project would be beneficial to the beach and dune system and that the excavation of OK-A is not expected to have adverse impacts have a solid base. His opinions are founded on extensive experience with beach restoration projects over 37 years; extensive experience with coastal processes, coastal morphology, and coastal hydrodynamics; review of the application and supporting information; experience with the Project area and vicinity; extensive experience with coastal storm impacts and beach erosion; and review of roughly three dozen technical documents. Mr. Clark has reviewed 136 beach restoration projects. Of these, 111 were in Florida, six in other states and Puerto Rico, and 19 in countries on every continent in the world other than Asia. But coastal engineering experience in Asia is not missing from Mr. Clark's resume. He has conducted beach erosion control projects and coastal and shore protection projects (as distinguished from beach restoration projects) in that continent as well. Among the "countless number" tr. 490, of such projects he has reviewed are ones in the Netherlands, Denmark, Italy, Turkey, Egypt, China, and the Bahamas." Id. The reason his experience extended beyond the State of Florida to nations all over the world is because "the Florida Beach Preservation Program is internationally recognized." Id. The State has received many requests for technical assistance from various world governments. Mr. Clark has also in his time away from his employment with the state served as a consultant to the governments of Mexico, the Cayman Islands, and the Island Nation of St. Bartholomew and the French West Indies. Mr. Clark has investigated the impacts of 83 tropical storms in the Gulf of Mexico. Most investigations have been in Florida but some have been in other Gulf states and along the coast of the country of Mexico. During some of those investigations and while acting as a coastal engineer for the state, Mr. Clark visited the vicinity of Santa Rosa Island 176 times, excluding academic field trips. In his capacity as a state coastal engineer, Mr. Clark provided the Department with detailed damage assessments for each of the eight tropical storms noted in the Consolidated NOI for the Western Destin Project Over his 37 years, Mr. Clark served on numerous task forces, committees and technical advisory groups relating to erosion control and beach management efforts by states along the Gulf and Mexico. Mr. Clark's early reports were used in the development of the state's Strategic Beach Management Plan and he prepared the first "Critically Eroded Beaches in Florida document" tr. 494, now electronically available to the public on the Department's website. The report prepared by Mr. Clark which led to the designation of the Western Destin Project beach as critically eroded showed that the areas from R-17 to roughly R-20.3 and R- 23.2 to R-25.5 revealed erosion through deflation of the beach profile and recession of the shoreline to such an extent that upland development and infrastructure would be threatened. The report is based on evaluation and projection of the impact of a 25-year storm event. The same report did not conclude that a 25-year storm event would provide the same level of threat to the area between R-20.3 and R-23.2 (the shoreline along the MACLA Intervenors' Property and the Oceania Gap) although that stretch of the beach is "potentially threatened by a 50 to a 100-year storm event." Tr. 499. The "R-20.3 to R-23.2" segment was included in the critically eroded designation for design and integrity of the Project and continuity of management of the coastal system. The designation of the Project area as critically eroded was made in 2006 and was updated by the Department at the request of the County in 2008. The 2008 update indicated no need to change the designation. Although not as threatened as the rest of the shoreline in the Project, the shoreline along the Middle Segment, (including the MACLA Intervernors' Property and the Oceania Gap) is erosional. Data obtained as late as October 19, 2009, indicate that there had been more erosion since a Mean High Water Survey located the MHWL in 2008. The data does not show volumetric change, only that "there is a continued trend of erosion" of the shoreline in the Oceania Gap. Tr. 506. With the Oceania Gap eliminated from the Project, elimination of the rest of the property in the Project's Middle Segment (between R-20.3 and R-23.2) would make the remainder of the Project unstable. It would "isolate a 2,000-foot segment between R-23.2 and R-25.5 [the Eastern Segment] . . . and a 2,000-foot fill segment is not long enough to be a stable fill segment." Tr. 507. Although the elimination of all of the Middle Segment would not hurt "the very far west end" of the Project "very much," tr. 508, the elimination of the entire Middle Segment from the Project would also make the very east end of the Western Segment "relatively unstable." Tr. 508. The Middle Segment, therefore, while not critically eroded, would benefit from beach restoration. Restoration will provide protection from the erosion it is experiencing and from 50-year and 100-year storm events should they occur during the life of the restoration. Restoration will include dune work that will provide protection from storm surge and dissipate the wave energy seaward of any structures in the Middle Segment. Recent storm events have been 50-year and 100-year events. In the area of the Project, "Hurricane Opal was comparable to a 100-year storm event." Tr. 509. In Pensacola Beach, Ivan was a 200-year event. In the Destin area, Ivan "probably dropped to just below a 100-year storm event in terms of its magnitude. Hurricane Dennis was probably comparable to a 50-year storm event." Id. The best defense against 25-year, 50-year, and 100- year storm events is beach restoration. The OK-A Borrow Area is an offshore borrow area. Mr. Clark gave a few examples of other borrow areas that are offshore borrow areas and that are as large as OK-A. These were borrow areas used in the restoration of beaches in Panama City, Delray Beach, Canaveral Shoals, and Anna Maria Island. In addition to Taylor's Borrow Area Impact Analysis Report, Mr. Clark based his opinion on review of monitoring data for the many restoration projects with which he has been involved. Mr. Clark has reviewed borrow area impacts on beach restoration projects that have had adverse impacts. But these projects, typically, were "in inlet ebb tidal deltas of tidal inlets." Tr. 518. Located about three miles east of the ebb shoal of East Pass, OK-A is not an inlet-related borrow area. Of the 111 beach restoration projects that Mr. Clark reviewed, there was one that had an off-shore borrow area that adversely impacted the adjacent beach: the Anna Maria Island Project. The Anna Maria Island Borrow Area was located "roughly 1,000 feet off the [adjacent] beach . . . ." Tr. 519. In comparison, OK-A "is four to five times further offshore than the Anna Maria Island borrow area." Tr. 520. If instead of OK-A, the Project were to use a borrow area as close to the shore as the Anna Maria Island Borrow Area, its impacts to the shoreline would be both adverse and beneficial. The impact to adjacent beach would be erosion, but to the beach to the west of the borrow area the impact would be accretion. Mr. Clark's opinion of no impacts to the beach from dredging OK-A would be entirely different if OK-A had been located in the near-shore zone where "it's a whole different ball game." Tr. 532. The location of OK-A, between 4,000 and 5,000 feet offshore is in a zone that is "no problem," that is, it is not in the near-shore and far enough off shore that it will not cause impacts, adverse or beneficial, to the beaches and shores of Okaloosa County. For all his experience and coastal engineering prowess, Mr. Clark is not an expert in modeling. He relies on others within the Department to evaluate the sufficiency of a model or its methodologies. Mr. Clark did not ask anyone in the Department to evaluate the models used by Taylor Engineering. Dr. Young disagreed with the opinions of Mr. Trudnak and Mr. Clark that there would be no adverse impacts to the beach. He was sure that the dredging of OK-A would cause an adverse impact that would be either erosion or a decrease in the accretion that occurred in recent years along the beaches of Okaloosa Island. Dr. Young also cast doubt on Mr. Clark's experience as support for the opinion that dredging of OK-A would cause no adverse impacts. "Nobody believes there's ever been an adverse impact from a borrow area . . . ." Tr. 1206. Dr. Young used the "real world" experience with the Walton Borrow Area to back up that doubt. "[T]he problem is that we're not doing a good job of monitoring this project [the Walton Project] and the problem is convenient interpretation of the monitoring results." Id. Dr. Young's doubt about the value of Mr. Clark's experience was tempered by the reality of beach restoration in contrast to other types of projects whose failure was sudden, dramatic and easily discernible. Dr. Young: [W]hen a bridge collapses, civil engineers converge on that failed project and they learn more from that failure than they could ever learn from a bridge that lasted 30 years. And . . . one of the problems with coastal project design is that never happens. We never have a beach nourishment project that disappears in six months or a borrow area that causes erosion and coastal engineers converge from around the country and say, wow, here's a project that went wrong. And I think that is one of the hurdles that we need to cross in order to do a better job of project design. * * * We have no clear definition of what a failed project is. So, that way you can never have one that fails. And to me, a failed project is one that does not meet the promises made in the design of that project. And a failed project is also one where there are impacts that occur as a result of the project that are not adequately mitigated or anticipated. Tr. 1150-1. When asked the question of whether there is a definition of a failed beach restoration project in the literature or that is generally accepted by the coastal engineering community, see tr. 1152, Dr. Young testified, "I have not seen one." Tr. 1152. He added, " I would assume they might offer a similar definition [to mine], if the project doesn't work the way we said it would, then we would consider that a failure. But there is certainly not large scale discussion of projects that did not perform as designed." Tr. 1152-3. Dr. Young, like Dr. Dally, did not perform any analysis to quantify any degree of erosion or decreased accretion. Nor has he ever performed modeling to analyze borrow area impacts in keeping with his view of the inutility of modeling for accurate prediction of beach impacts. Variance The "Variance" referenced in the Consolidated NOI concerns two related variances: one from rule 62- 4.242(2)(a)2.b., and the other from rule 62-4.244(5)(c). The northern boundary of the proposed borrow area is within Outstanding Florida Waters ("OFW"). That location led the County to seek a variance from the limitation in rule 62- 4.242(2)(a)2.b. that turbidity can exceed background conditions in OFW during permitted construction activity for no more than 30 days. Section (2) of rule 62-4.242 sets "standards applying to Outstanding Florida Waters." Subsection (a)2.b of section (2) of the rule reads as follows: (a) no Department permit . . . shall be issued for any proposed activity . . . within an [OFW] or which degrades an [OFW], unless the applicant affirmatively demonstrates that: * * * 2. The proposed activity . . . is clearly in the public interest, and . . . * * * b. the existing ambient water quality within [the OFW] will not be lowered as a result of the proposed activity . . . , except on a temporary basis during construction for a period not to exceed thirty days . . . . The County also sought a variance from rule 62- 4.244(5)(c) which governs mixing zones in surface waters and reads: In no case shall the boundary of a dredge and fill mixing zone be more than . . . 150 meters in radius in . . . bodies of water [other than flowing streams], where these distances are measured from the cutterhead, return flow, discharge or other points of generation of turbidity or other pollutants. Section 120.54(2) authorizes an agency to grant a variance as follows: Variances . . . shall be granted when the person subject to the rule demonstrates that the purpose of the underlying statute will be or has been achieved by other means by the person and when application of a rule would create a substantial hardship or violate principles of fairness. Nephelometric turbidity units ("NTUs") in OFWs cannot exceed zero at the edge of the 150 meter radius referenced in rule 62-4.244(5)(c). To keep NTUs at zero outside the 150 meter radius, the County "would have had to almost continually be shutting down . . . .[its hopper] dredge," tr. 415, because the turbidity plume created by the hopper dredge's activity would have regularly extended beyond the 150 meter radius. Use of a different type of dredge (such as a cutterhead) would not alleviate the need for the variances for the construction of the Project. A cutterhead dredge is substantially more expensive with regard to both mobilization costs and actual dredging: $15-$20 per cubic yard versus $8 per cubic yard for a hopper dredge. Cutterhead dredges, moreover, do not operate in waves as effectively as hopper dredges. In rough water, "a cutterhead would see much more down time and conditions [could cause] a cutterhead . . . to stop dredging and go into safe harbor into East Pass." Tr. 173. The variance from rule 62-4.244(5)(c), therefore, was needed because the standard size mixing zone would have created a substantial hardship for the County. In addition to outlining the substantial hardship, the County provided two additional bases in its application to justify the variances: (a) no resources in the area, such as hard bottom or sea-grass beds, would be affected by a turbidity plume and an expanded mixing zone; and (b) citation to the Pensacola Naval Air Station ("NAS") project claimed to be similar in that it involved OFW and had received a variance. Upon receipt of the application for the variances, the Department requested additional information to establish whether OK-A, in fact, would be within OFW and more analysis of the comparability with the Pensacola NAS project. The Department's engineering section determined that the comparability of the Pensacola NAS project was not adequately demonstrated because of a lack of detail about the hydrodynamics and mixing zone sizes of the two sites. Nonetheless, the staff responsible for making the final decision on the variances (and ultimately the Department) determined the County's information justifying the variances to be sufficient. In granting the variances, the Department did not rely on the County's comparison of the Project to the Pensacola NAS project. As explained by Dr. Edwards at hearing, "[H]aving the data . . . from an actual project to back up and . . . calibrate a mixing zone is an added bonus, but we just didn't have it in this particular case." Tr. 420. The Department based its decision, in part, however, on background knowledge from permitting of borrow areas and beach projects "all over the Panhandle," tr. 421, and the data gathered from them including "data from side scan sonar from seismic information all along this area." Id. Included in this background is knowledge of a similar mixing zone of 1,500 meters established for one of the Eglin AFB beach restoration projects which excavated OK-A with a hopper dredge and in which the 1500- meter mixing zone was determined to be appropriate. Independent of the information provided by the County, the decision, therefore, was founded on the Department's own knowledge that no resources would be impacted by an expanded mixing zone and that there was a comparable project in the area (not the Pensacola NAS project) that had been allowed a 1500- meter mixing zone. In applying the standard from section 120.54(2) related to the underlying intent of the rules at issue and the statutes, the Department determined that "[t]he Project in the OFW was clearly in the public interests, according to [section] 373.414 and the minimum Water Quality Standards, even within the mixing zone[,] would still be met." Tr. 421-2. There were at least two other mitigating factors that the Department entertained as support for its decision. First, because of the difficulty in controlling turbidity in open waters in the Gulf, the 1,500-meter mixing zone established by the Consolidated NOI actually "is on the small side," tr. 422, of a mixing zone for the dredging of a borrow area to serve a beach restoration project. Second, 29 NTUs is the maximum turbidity allowed in waters that are not OFW. An extended mixing zone to allow the County to exceed 29 NTUs outside OFW was not granted as part of the variances under the Consolidated NOI. Petitioners presented no evidence to rebut the testimony elicited by the Department and the County that the purpose of the statute underlying the rules from which the variances are sought will be met by other means and that the application of the rules will create a substantial hardship. Changed Site Conditions 267. Rule 62B-49.005(16) provides: If site conditions change during the processing of an application to such an extent that the data already provided can no longer be used to determine consistency as provided in this chapter, then the application shall be denied unless the applicant agrees to waive the 9-day time requirements of Chapter 120.60, Florida Statutes, and provides the additional information required to reanalyze the application. After the filing of the County's application, malfunction of British Petroleum's Deepwater Horizon offshore oil rig in the Gulf of Mexico led to the Oil Spill, a discharge of a massive amount of oil and natural gas into the Gulf of Mexico. No evidence was presented that showed the Oil Spill had caused impacts to the OK-A Borrow Area. The permit was revised, nonetheless, to add language in the wake of the Oil Spill that requires the County to visually inspect the borrow area prior to construction activity and to analyze sand samples from the borrow area. The County, therefore, plans to send a diver to collect samples to be analyzed for contamination. See tr. 175. Western Destin Erosion Control Line The requirement for an Erosion Control Line is in section 161.161: Once a project is determined to be undertaken, a survey of all or part of the shoreline within the jurisdiction of the local government in which the beach is located shall be conducted in order to . . . locate an erosion control line. * * * In lieu of conducting a survey, the board of trustees may accept and approve a survey as initiated, conducted, and submitted by the appropriate local government if said survey is made in conformity with the appropriate principles set forth in ss. 161.141-161.211. § 161.161(3), Fla. Stat. The Draft JCP as originally issued did not require the establishment of an ECL. It required the establishment of a Pre- project Mean High Water Line instead. The Second Revised Draft JCP dispensed with the requirement of a Pre-project MHWL. It requires that an ECL be established for all properties within the 1.7 miles stretch of beach in the Project area subject to beach restoration.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department of Environmental Protection enter a final order issuing the Joint Coastal Permit, Variance, and Sovereign Submerged Lands Authorization as revised during the course of these proceedings. DONE AND ENTERED this 29th day of June, 2011, in Tallahassee, Leon County, Florida. S DAVID M. MALONEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of June, 2011.