VALENTINOS KOUMOULIDIS vs CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 95-001359 (1995)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Mar. 20, 1995 Number: 95-001359 Latest Update: Jun. 23, 1995

The Issue The issue in this case is whether to grant the appeal of Valentinos Koumoulidis from the Planning and Zoning Board's denial of his application for variances from the requirement of a minimum lot width of 150 feet at the setback line and from the requirement of a minimum of 20 percent clear space.

Findings Of Fact When the Appellant, Valentinos Koumoulidis, bought the subject property, the building was being used as a six-unit motel--three units on each of two floors. There were approximately 1600 square feet of space on each of the two floors. The property fronts at 606 Bayway Boulevard; the back of the property is waterfront. In 1991, the Appellant applied for and was granted a parking variance and variances to enable him to convert the first floor to retail use and convert the second floor to a residence. Apparently construction was delayed, and in October, 1992, the Appellant reapplied for the variances to enable him to convert the first floor to retail use and convert the second floor to a residence, while withdrawing the application for a parking variance. (He had decided to convert from straight- in/back-out parking to an off-street parking lot.) In 1994, the Appellant again applied for variances, this time to allow him to add approximately 300 square feet of commercial space to the back of the first floor and approximately 900 square feet of residential space to the back of the second floor. The Board denied those variance requests in October, 1994. Rather than appeal, the Appellant decide not to pursue the addition of commercial space to the back of the first floor and, on December 22, 1994, instead applied for variances to allow him just to add approximately 900 square feet of residential space to the back of the second floor. (Of the 900 square feet, approximately 550 would be enclosed, and approximately 350 would be open deck.) The evidence (primarily through the testimony of Noel Woods, one of the Appellant's neighbors) was that the residential property in the immediate vicinity is comparable, in terms of square footage of living space per dwelling unit, to the Appellant's current second floor--i.e., approximately 1600 to 1700 square feet. There was some evidence that residential properties across the intracoastal waterway from the Appellant's property are valued as high as a million dollars. But the evidence (again, the testimony of Noel Woods) also was that condominium units in the immediate vicinity are valued at approximately $175,000. There was no evidence that the use the Appellant is making of his property (retail on the first floor and residential on the second floor) is not a reasonable use.

Florida Laws (1) 120.68
# 1
HELEN J. CRENSHAW vs VISTA OF FORT WALTON BEACH, LLC, AND NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 12-003280 (2012)
Division of Administrative Hearings, Florida Filed:Defuniak Springs, Florida Oct. 09, 2012 Number: 12-003280 Latest Update: Apr. 12, 2013

The Issue The issue is whether Vista of Fort Walton Beach, LLC (Vista), should be issued Surface Water Management Permit No. 04-2012-0013G authorizing the construction of an earthen embankment dam and impoundment to impound stormwater runoff from a proposed commercial development in the City of DeFuniak Springs (City), Walton County, Florida.

Findings Of Fact The District has regulatory jurisdiction over the construction of certain types of impoundments within its boundaries. If an impoundment is at least ten feet high but less than 25 feet in height and has an impounding capacity of at least 50 acre-feet, a general permit is required. See Fla. Admin. Code R. 40A-4.041(1). Vista, a limited liability corporation, owns an odd- shaped parcel in the City on which it intends to build a small commercial development consisting of a 17,000-square foot building, a parking lot, and related amenities. The vacant parcel abuts the north side of U.S. Highway 90 just east of 18th Street and is approximately 1.66 acres in size. The property is partially wooded and has a small wetland area on its northeastern corner. In conjunction with the proposed commercial development, Vista intends to construct an impoundment to control stormwater runoff from the project. Because the impoundment will be ten feet high and have an impounding capacity of at least 50 acre-feet, Vista is required to obtain a general permit. See Fla. Admin. Code R. 40A-4.041(1). Vista filed a permit application with the District on June 8, 2012. On August 8, 2012, the District gave notice that it intended to issue a surface water management permit to Vista. The permit allows the construction of a stormwater retention basin. A mitigation plan for impacts to 0.23 acres of wetlands was also approved but is not at issue in this proceeding. As described in the District staff report, the project will encompass one earthen embankment dam and impoundment to impound the storm runoff. It will operate as a dry stormwater retention basin designed to impound water only during rainfall events. The facility will utilize a pipe and riser spillway system, and the basin outfall will be protected by a rip-rap lined plunge pool. Due to space restrictions, an engineered retaining wall will be incorporated into the embankment's north side slope. The stormwater will discharge through controlled overflow structures into a nearby wetland area that lies northeast of Vista's property and will then be integrated into an existing channel that eventually forms the headwaters of Sandy Creek to the north. Petitioner has resided on her property since around 1932. Her odd-shaped parcel, described as being between five and seven acres in size, lies immediately to the north of Vista's property. A small wetland is located on the southeastern corner of her property. The two parcels share a common boundary line, appearing to be no more than a hundred feet or so. Because the boundary line is lower than the highest part of each owner's property, a "trench" has formed along the line. Wabash Avenue, a platted but un-built roadway that begins on U.S. Highway 90, runs to the northwest through the wetland area and along the eastern boundaries of both properties. As alleged in the Second Amended Petition, Petitioner is concerned that the project will cause flooding on her property. In a broader sense, she appears to be opposed to any commercial development on Vista's property. The back side of the Vista parcel slopes downhill to a recessed area that is adjacent to both properties. Although some fill has already been placed on the property in preparation for the development, the applicant intends to add "a lot" more fill to the entire parcel to create a gradual slope down to the edge of Wabash Avenue. A basin or pond around 0.20 acres in size will be formed within the fill area and a retaining wall consisting of multiple segments will be constructed around the basin. The wall will be separated from Petitioner's property by a 20-foot buffer, while at its closest point the basin will be "35 feet or so" from her property line. The plans submitted by the applicant demonstrate that the system will be built in accordance with all District standards and should operate in a safe manner. Before construction can begin, the District must approve the retaining wall design specifications. During rain events, the first inch of water will be retained on site for treatment. Additional water will be stored in the basin and then slowly allowed to discharge from the basin into the wetlands. The point of discharge from the basin is at a location a minimum of 20 feet south and east of Petitioner's property line. To ensure that the retention system will not discharge runoff at a higher rate than was discharged before development, Vista performed hydrologic calculations demonstrating pre- and post-development runoff. According to accepted models developed by the United States Department of Agriculture and its predecessor, the Soil Conservation Service, the current peak runoff from the Vista property is 2.46 cubic feet per second (CFS) during a two-year, 24-hour storm event. After development, the volume of water will be reduced to 0.74 CFS. During a 25-year, 24-hour storm event, the volume of runoff post-development is anticipated to drop from 12.59 CFS to 6.51 CFS. Finally, during a 100-year, 24-hour storm event, post- development runoff will be slightly reduced from 19.64 CFS to 18.99 CFS. Therefore, as sited, sized, and designed, the project will reduce runoff during all anticipated storm events. The foregoing calculations were not credibly contradicted and satisfy the requirement that an applicant give reasonable assurance that the project will not cause an increased flow such that it will endanger downstream property in times of flood with respect to state or frequency. See Fla. Admin. Code R. 40A-4.301(2)(f). They also confirm that water in the impoundment will not be raised to a level that could be harmful to the property of others. See Fla. Admin. Code R. 40A- 4.301(2)(c). Thus, the potential for flooding on Petitioner's property will be reduced if the project is constructed as permitted. The Department of Transportation (DOT) is currently repairing the drainage system on U.S. Highway 90 in front of the Vista property. Stormwater from that project drains into the wetlands through an easement deeded to the City at the rear of the Vista property. Petitioner pointed out that after the DOT project began, and fill was added to the Vista property, she has experienced an increase in water on her property. Whether the DOT project is responsible in any way for this hydrologic change is not known. However, accepted testimony by two professional engineers supports a finding that Vista is not responsible for any hydrologic changes on Petitioner's property. Vista was not required to take into account any runoff from the DOT project in making its hydrologic calculations because the amount of runoff from its own property will actually be reduced by the retention system. At hearing, Petitioner contended that a fence she built on the common boundary line with Vista sometime after 1990 was illegally removed by Vista in order to construct the basin. According to Mr. George, who first surveyed the property line in 1990 and then surveyed it a second time a few years ago, the fence was built a few feet beyond Petitioner's property line and lies within the buffer zone between the basin and her property. Petitioner argues that even if this is true, the doctrine of adverse possession applies and she is now the owner of the property on which the fence was built. This type of dispute, however, can only be resolved in circuit court, and not in an administrative forum. See § 26.012(2)(g), Fla. Stat. The District has examined the property records and is satisfied that Vista has ownership of the property on which the impoundment will be built. Notably, the basin will not be located within the 20-foot buffer where the fence once stood and which is dedicated to the City as an easement. Finally, through cross-examination at hearing, Petitioner suggested that any project designed by humans carries with it the remote possibility that it will fail and create a catastrophic situation on her property. In the unlikely event that the design and operation of the retention basin threaten the safety of adjoining property owners, section 373.429 and rule 40A-1.205 enable the District to revoke, suspend, or modify a permit to protect the safety of others.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Northwest Florida Water Management District enter a final order approving the issuance of Surface Water Management System Permit No. 04-2012-0013G to Vista. DONE AND ENTERED this 11th day of March, 2013, in Tallahassee, Leon County, Florida. S D. R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of March, 2013. COPIES FURNISHED: Jonathon Steverson, Executive Director Northwest Florida Water Management District 152 Water Management Drive Havana, Florida 32333-4712 Helen J. Crenshaw 61 North 18th Street DeFuniak Springs, Florida 32433-9547 Kevin X. Crowley, Esquire Pennington, Moore, Wilkinson, Bell & Dunbar, P.A. Post Office Box 10095 Tallahassee, Florida 32302-2095 James Busby Vista of Fort Walton Beach, LLC Post Office Box 760 Fort Walton Beach, Florida 32549-0760

Florida Laws (4) 120.5726.012373.42995.16
# 2
2521 COUNTRYSIDE BLVD. LLP, ET AL. vs CITY OF CLEARWATER (THE CITY), 19-006416 (2019)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Dec. 04, 2019 Number: 19-006416 Latest Update: Apr. 23, 2020

The Issue The ultimate issue in this appeal is whether to approve, approve with conditions, or deny the Development Order issued to Appellee Pinellas Education Organization, Inc., d/b/a Enterprise High School (Applicant or School), by the Board on December 3, 2019. Specifically, the following issues must be resolved: Whether Appellants have standing to appeal the Development Order. Whether the issues raised by Appellants at the Oral Argument were properly preserved for appeal. Whether there is substantial competent evidence in the record to support approval of the Development Order.3 Whether the Board's decision departs from the essential requirements of the law. If the Development Order is affirmed, whether any additional conditions are appropriate. PROCEDURAL HISTORY Appellee School filed an application to renovate an existing building to operate a high school at 2495 Enterprise Road, in Clearwater, Florida.4 The Board held a quasi-judicial public hearing on the application on November 19, 2019 (Board Hearing). The Board approved the School's application with conditions and the City issued the Development Order on December 3, 2019. On December 4, 2019, two separate Appeal Applications were filed regarding the Development Order: (1) by 2521 Countryside Blvd., LLP, Countryside Property Principals, LLC, Bruce Levine, and Joan Levine; and by 2505 Enterprise, LLC, and Greg Willsey, and Sandra Willsey. The Appeal Applications were fairly similar and raised a number of issues: four issues pertaining to traffic and parking requirements; and one issue as to whether a high school is a compatible use with the surrounding area. The City referred the matter to DOAH on December 4, 2019, and it was 3 Section 4-505C states, "The burden shall be upon the appellant to show that the decision of the community development board cannot be sustained by substantial competent evidence before the board, or that the decision of the board departs from the essential requirements of law." 4 The School's application went through a Level Two approval process which requires a quasi-judicial public Board hearing to approve flexibility (i.e. deviation) from the minimum development standards set forth in the Code. See Code at §4-401. Level Two approvals must meet both the general applicability criteria and the flexibility criteria outlined by the Code. See Code at Art. 4, Divisions 1, 3, 4 and 6. assigned to an administrative law judge. On December 13, 2019, a telephonic scheduling conference was held to determine the record on appeal and set the oral argument hearing. During that conference the parties agreed not to submit pre-argument briefs, but rather, chose to file post-hearing proposed final orders. The Oral Argument was held at the Clearwater Library and was open to the general public. Applicant, the City, the Board, and all persons who were granted party status at the Board Hearing were allowed to present arguments at the Oral Argument. See Code at 4-505B. At the Board Hearing the following people were granted party status: Dr. Richard Gottlieb, who was represented by Todd Pressman; Sandra Willsey; Greg Willsey; and Todd Burch. The transcript of the Oral Argument was filed with DOAH on February 19, 2020. Pursuant to section 4-505D, the proposed final orders were due within 20 days after the filing of the transcript, or no later than March 11, 2020. Per the City's request, the parties were granted an extension to submit proposed final orders. The additional time was to allow the parties to collaborate on a master index to the record on appeal (Index), which they intended to cite to in their proposed orders. The Index and the proposed final orders were timely submitted on March 23, 2020.5 5 At the Oral Argument, the parties stipulated that the undersigned could take official recognition of the Code provisions and City of Clearwater Comprehensive Plan (Comprehensive Plan) found online. As such, the undersigned takes official recognition of the Code found at https://library.municode.com/fl/clearwater/codes/ community_development_code?nodeId=CODECO (last visited April 14, 2020); and of the Comprehensive Plan found at https://www.myclearwater.com/government/city- departments/planning-development/divisions-/development-review-zoning/comprehensive- plan (last visited April 14, 2020). FACTS IN THE RECORD Pursuant to section 4-505A, the record includes the application file of the Clearwater Planning and Development Department (Planning Department); the agenda packet of the Board Hearing; all exhibits accepted into evidence at the Board Hearing; and the streaming video of the Board Hearing.6 The following findings of fact are supported by substantial competent evidence found in the record. Parties and Property The School filed an application with the Planning Department to renovate a 16,696 square foot building located on a 1.730 acre site at 2495 Enterprise Road in Clearwater, Florida (proposed development). The proposed development is in a retail/office plaza known as Village at Countryside (Plaza), located on the east side of Enterprise Road, just south of Countryside Boulevard in Clearwater, Florida. The Plaza consists of 11 parcels, including a large vacant building that formerly housed a Toys-R-Us store. The Plaza is located within the US 19 Corridor Redevelopment Plan, and has a designation of "US 19 District, Regional Center sub-district" (US 19-RC). Property within US 19-RC is subject to the special zoning district and development standards found at Appendix B of the Code.7 The School seeks to operate Enterprise High School, a charter high school, at the proposed development site.8 As explained below, relevant to this appeal is the number of students at the School and whether there will be adequate parking for the proposed development as required by the Code. 6 See Video of Board Hearing held November 19, 2019, on Agenda FLD2019-8026 at time marker 9:25 at http://clearwater.granicus.com/MediaPlayer.php?view_id=50&clip_id=3782 (last visited April 1, 2020). 7 See Code at Appendix B – US 19 Zoning District and Development Standards, found at https://library.municode.com/fl/clearwater/codes/community_development_code?nodeId=APX BUS19ZODIDEST (last visited April 14, 2020). 8 Enterprise High School is an existing charter school which intends to move from its current location to the proposed development site. The School is subject to section 1013.33, Florida Statutes. Appellants own and operate property within the Plaza and adjacent to the proposed development site. Specifically, Bruce and Joan Levine own Appellants 2521 Countryside Blvd., LLP,9 and Countryside Property Principals, LLC. The LLP and/or LLC operate the Countryside Foot and Ankle Center.10 The Countryside Foot and Ankle Center's administrator, Todd Burch, was granted party status at the Board Hearing. Greg and Sandra Willsey own Appellant 2505 Enterprise, LLC, which is a property in the Plaza. The Willseys were also granted party status at the Board Hearing. At the conclusion of the Board Hearing, the Board voted to approve the School's application. On December 3, 2019, a Development Order was issued to memorialize the Board's action. Thereafter, Appellants filed the Appeal Applications with a document titled "Notice and Statement" which stated the following grounds for the appeals: The Neighbors assert that the decision of the Community Development Board ("the Board") was not supported by substantial competent evidence and was a departure from essential requirements of law. Specifically: The Board's decision was based upon a high school with two, 200-student shifts. However, the record below established that these student shifts would substantially overlap during the noon hour. In other words, the evaluation of the proposed change of use was based on impacts and site requirements that were substantially less than what would actually occur on the site. 9 The Appeal Application lists this entity as 2521 Countryside Boulevard Land Trust. 10 Although Appellants state that Bruce Levine was granted party status at the Board Hearing, there is no substantial competent evidence in the record supporting this statement. See Appellees' Proposed Final Order at p. 3; compare Tab 30 of the Index, Board Meeting Minutes for November 19, 2019, at p. 3 and 5. The Board's decision was based on a traffic analysis provided by the applicant that used a wrong ITE trip generation code - an elementary school instead of a high school - so it cannot be relied upon as a basis for the underlying decision. The change of use to a high school required that the applicant establish that it had one parking space per three students. There is no substantial competent evidence to establish that this parking requirement was satisfied. To the contrary, the substantial competent evidence establishes that the parking on the property failed to meet this requirement. In fact, granting this change of use would result in a substantial oversubscription of the available parking at the site. The proposed use would create tortured on-site parking and traffic circulation patterns that would substantially impact the existing medical office uses on the property, including a kidney dialysis office that serves a substantial elderly population. There is no substantial competent evidence to support the finding that the change of use would "have no impacts on the adjacent retail plaza." To the contrary, the change of use would have substantial impacts on the current retail and office plaza. The proposed change of use would have substantial negative impacts on the surrounding community and is incompatible with the existing surrounding retail, office and residential uses. At the Oral Argument, Appellants raised for the first time whether the operation of a school is an inconsistent use with: (1) an Amended and Restated Declaration of Establishment of Restrictive Covenants, Conditions, and Restrictions, and Grants of Easements dated December 7, 1983 (the "Parking Easement"); and (2) the Comprehensive Plan. The Studies The first four issues raised in the Appeal Applications are related to the Parking Study and Traffic Study (collectively referred to as the Studies) which were submitted by the School as part of its application. The Parking Study, dated September 2, 2019, consists of overall parking calculations; aerial photographs of the development site and surrounding areas; and the Parking Easement. The purpose of the Traffic Study was to analyze the impact of the development on the traffic intersection at Countryside Boulevard and Enterprise Road, as well as the full access drive at the site. The 50-page Traffic Study, dated October 18, 2019, included numerous charts, maps, and tables with underlying information and data relating to the traffic counts for the proposed development. Jerry Dabkowski, a local traffic engineer who prepared the Studies for the School, testified at the Board Hearing about the traffic and parking calculations. To rebut the Studies, at the Board Hearing Mr. Pressman presented a two-page letter from a professional engineer dated November 15, 2019, titled "Traffic Study Review." Relevant to the appeal, the letter finds fault in the number of students and the "ITE Code" used in the Traffic Study and in the Planning Department's Staff Report and Recommendation (Staff Report), dated November 19, 2019, which was also presented to the Board. These factors would affect the calculations for the number of parking spaces required for and the trip distribution caused by the proposed development. Number of Students Appellants argue the parking calculations should be based on the total number of students enrolled at the School, or 400 students. The Studies and the Staff Report calculated the traffic and number of parking spaces necessary based on two shifts with 200 students per shift. At the Board Hearing, Donna Hulbert, the School's Director, testified that unlike a traditional high school, the School operated in two shifts to allow the students to hold employment while completing their high school education. Although the School intends to enroll a total of 400 students, she explained, each of the two shifts would have a maximum of 200 students. Additionally, the students are eligible for a public transportation bus pass, which some students utilize instead of driving their personal vehicles. The Study establishes that "[t]o reduce the impacts during the AM and PM peak hours, the school intends to split the day into two shifts, each with 200 students attending." Although there was conflicting information between the School's application and Ms. Hulbert's testimony at the Board Hearing about whether the shifts would overlap, the Staff Report recommends approval of the application because, "[t]he applicant has provided the school will operate in two shifts . . . with no more than 200 students present per shift." There is substantial competent evidence that there will be only 200 students at the School at a time, and that this number was correctly used in calculating the required parking spaces and the trip generation for the proposed development. ITE Trip Calculation Appellants argue the Traffic Study utilized the wrong Institute of Transportation Engineers' (ITE) Trip Generation Code, 520, which is the code applicable to an elementary school. The Study, however, states it utilized ITE Code 530 from the Institute of Transportation Engineers' Trip Generation, 10th Edition for Office, to calculate the change in trips attributed to the proposed development. A copy of the ITE Code 530 was attached to the Traffic Study. Additionally, Mr. Dabkowski testified that ITE Code 530 was the correct code for high schools. There is substantial competent evidence that ITE Code 530 was used in calculating the change in trips for the Traffic Study which was relied upon in the Staff Report, and which was accepted by the Board. Parking Requirements Table 2 in section B-303, Permitted uses and parking, provides the following parking requirements relevant to this appeal. Use Regional Use Specific Standards Minimum Off-Street Parking Spaces Retail Plaza BCP[Level 1 Minimum Standard(Building Construction permit)] [Not included] 4/1,000 SF GFA Schools FLD [Level 2 Flexible Development (Board approval required)] 1. All off-street parking is located at least 200 feet from any property designated as residential in the Zoning Atlas 1 per 3 students Based on this criterion, the School would require 67 parking spaces (200 students/3 = 66.6667). The Staff Report and Studies establish the proposed site has 55 parking spaces, but five of these spaces cannot be used because they are within 200 feet from a parcel designated as Residential. Thus, there are 49 available parking spaces "on site," leaving 18 spaces to be designated. As stated earlier, the proposed site is one of 11 parcels in the Plaza. The Parking Study contains a copy of a Parking Easement that allows cross- parking among the parcels. Based on the square footage of the buildings on the parcels (including the proposed development site), the entire Plaza is required to have 975 parking spaces. The Plaza actually has 1,137 parking spaces, an excess of 162 parking spaces. The Code also requires off-street parking spaces be located within 600 feet of the principal and accessory uses they serve. See Code at § 3-1404A. Next to and within 600 feet of the proposed development site is currently a vacant building that formerly housed a Toys-R-Us store. That parcel has 228 parking spaces, but only 177 spaces are required for that building, leaving an extra 51 parking spaces. Based on the excess spaces available through the Parking Easement, there is substantial competent evidence supporting the City's staff finding of adequate parking spaces to satisfy the additional 18 spaces necessary for the proposed development, and the Board's approval of the same. Compatible Use The fifth issue raised in the Appeal Applications is regarding the use of the proposed development site as a charter high school. Whether this site is appropriate for the type of school operated by the Applicant was a topic of discussion among the Board members at the Board Hearing. At the Board Hearing, Planning Department Manager Mark Parry testified as an expert witness. Mr. Parry explained the nature of the US 19- RC standards and gave his opinion that the proposed development complies with all applicable provisions of the Code, including the use requirements. In contrast, Appellants expressed anecdotal fears that the types of students attending the School would disrupt Appellants' medical businesses. For example, at the Board Hearing, Mrs. Willsey expressed concern that the students at the School were known to have "behavioral problems." Mr. Burch spoke about the increased number of pedestrians in the Plaza and cited to a letter in the record from Dr. Levine: "For us to have to monitor and police our properties for trespassing students would be untenable." There was no actual evidence in the record that the School's operations would cause any problems such as increased crime or trespassing in the area. At the Oral Argument and in their proposed final order, however, Appellants' argument shifted away from the potential effects of the students in the area and instead offered the new arguments that the School was inconsistent with the Parking Easement which states the Plaza shall be used "for commercial purposes only, including without limitation the operation of merchandising establishments, restaurants, and professional offices."11 Regardless, as explained below, this argument is not appropriate on appeal because it was not raised at the Board Hearing or in the Appeal Applications. At the Oral Argument, Appellants also argued that the School is an inconsistent use with the Comprehensive Plan. Appellants cited a paragraph from the Staff Report: The proposal includes a new charter school with grades nine through 12 and constitutes a public educational facility as defined by Policy J.2.1.2. The school will be located within the US 19–RC future land use designation. The prior designation was Commercial General (CG). The intent is that all uses permitted in the CG are also permitted in the US 19–RC classification. The City is planning to update the Comprehensive Plan to reflect this. Schools are a listed permitted use in the CG classification. As explained below, this argument is also inappropriate because it was not raised at the Board Hearing or in the Appeal Applications. Appellants also argue the proposed development is an inconsistent use with the existing businesses because the adjacent properties are commercial in nature and the School is not commercial. The Code, however, clearly allows Schools as an allowable use in the US 19-RC zoning district, and in the 11 The Complete section of the Parking Easement titled "Uses" states: 2.1 Uses in General The Property, consisting of both the Building Area and the Common Areas, shall be used for commercial purposes only, including without limitation the operation of merchandising establishments, restaurants, and professional offices. No portion of the Property shall be used or operated as a discotheque, bar or cocktail lounge (except in connection with a restaurant) ... theatre, bowling alley, skating rink, roller disco or catering hall, funeral parlor, or for the sale of pornographic literature or material, or an adult book store or so called "head shop" or for a video or other game arcade, flea market, or for a use which would be noxious or immoral or otherwise constitute moral turpitude or constitute an undignified, disreputable use. previous zoning designation of CG. See Code at § B-303. Moreover, unlike the Parking Easement, the Code does not divide use categories into "Commercial" and "Non-Commercial." Rather, the uses are categorized as "Residential" and "Non-Residential." Id. Based on the Code and the review of the application submissions, the Staff Report concluded the School will be an appropriate use in the area. Based on Staff visits, aerial photographs and material submitted by the applicant it is evident that the proposal will be in harmony and consistent with the scale, bulk, coverage and character of adjacent properties and, generally, with properties in the greater neighborhood. The reuse of the 16,700 square foot building with a school will not result in any adverse visual impacts on adjacent properties. Since the character of the site will not change with the proposal, and it is currently similar in nature vis-a-vis placement of other uses in the area it is not expected to impair the value of those properties. The proposal will likely have no effect, negative or otherwise, on the health or safety of persons residing or working in the neighborhood. The testimony of Mr. Parry, coupled with the Staff Report, constitute substantial competent evidence supporting the Board's finding that the School is a compatible use with the area.

Florida Laws (1) 1013.33 DOAH Case (1) 19-6416
# 3
GREENSPACE PRESERVATION ASSOCIATION, INC.; FRANK WARD; SAL LOCASCIO; FREDERICK P. PETERKIN; AND HAROLD M. STAHMER vs ST. JOHNS RIVER WATER MANAGEMENT DISTRICT AND CITY OF GAINESVILLE, 97-002845 (1997)
Division of Administrative Hearings, Florida Filed:Gainesville, Florida Jun. 13, 1997 Number: 97-002845 Latest Update: Jul. 12, 2004

The Issue The issue is whether the City's applications for an individual stormwater permit and a noticed general environmental resource permit for Phase 1A of the proposed Hogtown Creek Greenway should be approved.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In these two cases, Respondent, City of Gainesville (City), seeks the issuance of a stormwater system management permit (stormwater permit) to construct a 2,000-foot long asphaltic trail/boardwalk, a parking facility and associated improvements for Phase 1A of the Hogtown Creek Greenway project in the north central portion of the City. That matter is docketed as Case No. 97-2845. The City also seeks the issuance of a noticed general environmental resource permit (NGP) to construct 481 square feet of piling supported structures over wetlands or surface waters for the same project. That matter has been assigned Case No. 97-2846. Respondent, St. Johns River Water Management District (District), is the regulatory agency charged with the responsibility of reviewing and approving the requested permits. Petitioner, Greenspace Preservation Association, Inc., is a not-for-profit Florida corporation primarily composed of persons who own real property adjacent to the route proposed by the City, as well as local environmental interests. Petitioners, Frank Ward, Sal Locascio, Frederick P. Peterkin, and Harold M. Stahmer, are individuals who own real property adjacent to the route proposed by the City for the Greenway. The parties have stipulated that Petitioners are substantially affected by the District's proposed action and thus have standing to initiate these cases. On March 28, 1997, the City filed applications for a stormwater permit and a NPG for Phase IA of the Hogtown Creek Greenway project. After conducting a review of the applications, including an on-site visit to the area, in May 1997, the District proposed to issue the requested permits. On June 9, 1997, Petitioners timely filed a Petition for Initiation of Formal Proceedings as to both intended actions. As amended and then refined by stipulation, Petitioners generally allege that, as to the stormwater permit, the City has failed to provide reasonable assurance that the project meets the permitting requirements of the District; the City has failed to provide reasonable assurance that the stormwater system will not cause violations of state water quality standards; the City has failed to provide reasonable asurance that the project satisfies the District's minimum required design features; and the City has failed to provide reasonable assurance that the stormwater system is capable of being effectively operated and maintained by the City. As to the NPG, Petitioners generally allege that the piling supported structure is not less than 1,000 square feet; the jurisdictional wetlands are greater than the area shown on the plans submitted by the City; the City has failed to provide reasonable assurance that the system will not significantly impede navigation; the City has failed to provide reasonable assurance that the system does not violate state water quality standards; the City has failed to provide reasonable assurance that the system does not impede the conveyance of a watercourse in a manner that would affect off-site flooding; the City has failed to provide reasonable assurance that the system will not cause drainage of wetlands; and the City failed to provide reasonable assurance that the system does not adversely impact aquatic or wetland dependent listed species. Respondents deny each of the allegations and aver that all requirements for issuance of the permits have been met. In addition, the City has requested attorney's fees and costs under Section 120.595(1)(b), Florida Statutes (Supp. 1996), on the theory that these actions were filed for an improper purpose. A General Description of the Project The Hogtown Creek Greenway is a long-term project that will eventually run from Northwest 39th Street southward some seven miles to the Kanapaha Lake/Haile Sink in southwest Gainesville. These cases involve only Phase 1A of that project, which extends approximately one-half mile. This phase consists of the construction of a 2,000-foot long asphaltic concrete trail/boardwalk, a timber bridge and boardwalk, a parking facility, and associated improvements. The trail will extend from the Loblolly Environmental Facility located at Northwest 34th Street and Northwest 5th Avenue, to the intersection of Northwest 8th Avenue and Northwest 31st Drive. The trail will have a typical width of ten feet. For the majority of its length, the trail will be constructed of asphaltic concrete overlying a limerock base, and it will generally lie at the existing grade and slope away from the creek. Besides the trail, additional work involves the repaving of Northwest 5th Avenue with the addition of a curb and gutter, the construction of an entrance driveway, paved and grassed parking areas, and sidewalks at the Loblolly Environmental Facility, and the widening and addition of a new turn lane and pedestrian crosswalk at the intersection of Northwest 8th Avenue and Northwest 31st Drive. The Stormwater Permit Generally The entire Phase IA project area lies within the Hogtown Creek 10-year floodplain. It also lies within the Hogtown Creek Hydrologic Basin, which basin includes approximately 21 square miles. The project area for the proposed stormwater permit is 4.42 acres. Water quality criteria Phase IA of the Greenway will not result in discharges into surface groundwater that cause or contribute to violations of state water quality standards. When a project meets the applicable design criteria under the District's stormwater rule, there is a presumption that the project will not cause a violation of state water quality standards. There are two dry retention basins associated with the project. Basin 1 is located at the cul-de-sac of Northwest 5th Avenue and will capture and retain the stormwater runoff from the new and reconstructed impervious areas at the Loblolly Facility. Basin 2 is located at the parking area and will capture and retain stormwater runoff at the existing building and proposed grass parking area. Under the stormwater rule, the presumptive criteria for retention basins require that the run-off percolate out of the basin bottom within 72 hours. The calculations performed by the City's engineer show that the two retention basins will recover within that timeframe. In making these calculations, the engineer used the appropriate percolation rate of ten inches per hour. Even using the worst case scenario with a safety factor of twenty and a percolation rate of one-half inch per hour, the two retention basins will still recover within 72 hours. The presumptive criteria for retention basins require that the basin store a volume equal to one inch of run-off over the drainage area or 1.25 inches of run-off over the impervious area plus one-half inch of run-off over the drainage area. The calculations performed by the City's engineer show that the two retention basins meet the District's volume requirements for retention systems. An applicant is not required to utilize the presumptive design criteria, but instead may use an alternative design if the applicant can show, based on calculations, tests, or other information, that the alternative design will not cause a violation of state water quality standards. As a general rule, the District applies its stormwater rule so that water quality treatment is not required for projects or portions of projects that do not increase pollutant loadings. This includes linear bicycle/pedestrian trails. The City's proposed trail will not be a source of pollutants. The City will install signs at both entrances to the trail to keep out motorized vehicles. Except for emergency and maintenance vehicles, motorized vehicles will not be permitted on the trail. The infrequent use by emergency or maintenance vehicles will not be sufficient to create water quality concerns. The construction of a treatment system to treat the stormwater from the trail would provide little benefit and would only serve to unnecessarily impact natural areas. Although treatment of the stormwater run-off from the trail portion of the project is not required under District rules, the run-off will receive treatment in the vegetated upland buffer adjacent to the trail. The District's proposed other condition number 3 will require the City to plant vegetation in unvegetated and disturbed areas in the buffer. This will reduce the likelihood of erosion or sedimentation problems in the area of the trail. Although disputed at hearing, it is found that the City's engineer used the appropriate Manning coefficient in the calculations regarding the buffer. Even without a vegetated buffer, run-off coming from the bicycle trail will not violate state water quality standards. The City will install appropriate erosion and sediment controls. These include siltation barriers along the entire length of both sides of the proposed trail prior to commencing construction. Such barriers will not allow silt or other material to flow through, over, or under them. The City will also place hay bales and any other silt fencing necessary to solve any erosion problem that may occur during construction. In addition, the permit will require an inspection and any necessary repairs to the siltation barriers at the end of each day of construction. Saturation of the limerock bed under the paved portion of the trail is not expected to cause a problem because heavy vehicles will not regularly use the trail. The trail portion of the project can be adequately maintained to avoid deterioration. Sensitive Karst Areas Basin criteria The two proposed dry retention basins for Phase 1A are located within the District's Sensitive Karst Areas Basin. They include all of the minimum design features required by the District to assure adequate treatment of the stormwater before it enters the Floridan aquifer and to preclude the formation of solution pipe sinkholes in the stormwater system. There will be a minimum of three feet of unconsolidated soil material between the surface of the limestone bedrock and the bottom and sides of the two retention basins. The appropriate mechanism for determining the depth of limestone is to do soil borings. The soil borings performed by the City show that there is at least three feet of unconsolidated material between the bottom of the basins and any limerock where the borings were taken. In other words, limestone would not be expected to be within three feet of the bottom of either basin. Based on the soil boring results, the seasonal high water table is at least six feet below ground level. The depth of the two retention basins will be less than ten feet. Indeed, the depth of the basins will be as shallow as possible and will have a horizontal bottom with no deep spots. To make the retention basins any larger would require clearing more land. A large shallow basin with a horizontal bottom results in a lower hydraulic head and therefore is less potential for a sinkhole to form. Before entering the basins, stormwater will sheet flow across pavement and into a grass swale, thereby providing some dispersion of the volume. Finally, the two retention basin side slopes will be vegetated. Special condition number 7 provides that if limestone is encountered during excavation of a basin, the City must over- excavate the basin and backfill with three feet of unconsolidated material below the bottom of the basin. Drainage and flood protection Contrary to Petitioners' assertions, the project will not adversely affect drainage or flood protection on surrounding properties. The trail will be constructed generally at existing grade. Because the trail will be constructed at existing grade, the net volume of fill necessary for Phase 1A is approximately zero. Therefore, there will not be a measurable increase in the amount of runoff leaving the site after construction, and the trail will not result in an increase in off-site discharges. District rules require that the proposed post- development peak rate of discharge from a site not exceed the pre-development peak rate of discharge for the mean annual storm only for projects that exceed fifty percent impervious surface. The proposed project has less than fifty percent impervious surface. Even though it is not required, the City has demonstrated that the post-development rate of discharge will not exceed the pre-development peak rate of discharge. Both basins will retain the entire mean annual storm so that the post-development rate of discharge is zero. Even during a 100-year storm event, the retention basins willl not discharge. Therefore, there will not be any increase in floodplain elevations during the 10, 25, or 100-year storm events from the proposed project. Operation and maintenance entity requirements The applicable requirements of Chapter 40C-42, Florida Administrative Code, regarding operation and maintenance, have been met by the applicant. The City proposes itself as the permanent operation and maintenance entity for the project. This is permissible under District regulations. The duration for the operation and maintenance phase of the permit is perpetual. The City has adequate resources and staff to maintain the phase 1A portion of the project. The public works department will maintain the stormwater management system out of the City's utility fund. The City provides periodic inspections of all of its stormwater systems. These inspections are paid for out of the collected stormwater fees. The City will also conduct periodic inspections of the project area, and the two retention basins will be easily accessed by maintenance vehicles. The City will be required to submit an as-built certification, signed and sealed by a professional engineer, once the project is constructed. Monthly inspections of the system must be conducted looking for any sinkholes or solution cavities that may be forming in the basins. If any are observed, the City is required to notify the District and repair the cavity or sinkhole. Once the system is constructed, the City will be required to submit an inspection report biannually notifying the District that the system is operating and functioning in accordance with the permitted design. If the system is not functioning properly, the applicant must remediate the system. The City will be required to maintain the two retention basins by mowing the side slopes, repairing any erosion on the side slopes, and removing sediment that accumulates in the basins. Mowing will be done at least six times per year. The City will stabilize the slopes and bottom areas of the basins to prevent erosion. The City has a regular maintenance schedule for stormwater facilities. The project will be included within the City's regular maintenance program. The City has budgeted approximately $80,000.00 for maintenance of the trail and vegetated buffer. Also, it has added new positions in its budget that will be used to maintain and manage the Greenway system. Finally, City staff will conduct daily inspections of the Phase 1A trail looking for problems with the vegetated buffer, erosion problems along the trail, and sediment and debris in the retention basin. If the inspections reveal any problems, the staff will take immediate action to correct them. The Noticed General Environmental Resource Permit Generally By this application, the City seeks to construct 481 square feet of piling supported structures over wetlands or surface waters. The proposed structures include a 265 square foot timber bridge over an un-vegetated flow channel, which connects a borrow area to Possum Creek, and a 216 square foot boardwalk over two small wetland areas located south of the flow channel. None of the pilings for the bridge or boardwalk will be in wetlands, and no construction will take place in Hogtown or Possum Creeks. The paved portion of the trail will not go through wetlands, and there will be no dredging or filling in wetlands. The receiving waters for the project are Hogtown and Possum Creeks. Both are Class III waters. Hogtown Creek originates in north central Gainesville and flows southwest to Kanapaha Lake/Haile Sink in southwest Gainesville. Possum Creek originates in northwest Gainesville and flows southeast to its confluence with Hogtown Creek south of the proposed bridge structure. Wetlands The total area of the proposed bridge and boardwalk over surface water or wetlands is approximately 481 square feet. The wetland delineation shown on the City's Exhibit 5A includes all of the areas in the project area considered to be wetlands under the state wetland delineation methodology. The United State Army Corps of Engineers' wetland line includes more wetlands than the District wetland line. The former wetland line was used to determine the area of boardwalk and bridge over wetlands. Even using this line, however, the total area of boardwalk over surface waters or wetlands is approximately 481 square feet and is therefore less than 1,000 square feet. Navigation The proposed system does not significantly impede navigation. Further, the structures will span a wetland area and an un-vegetated flow channel, both of which are non-navigable. In fact, the flow channel generally exhibits little or no flow except after periods of rainfall. Water quality The construction material that will be used for the bridge and boardwalk will not generate any pollutants. Morever, chemical cleaners will not be used on those structures. Silt fences will be used and vegetation will be planted in the vicinity of the bridge and boardwalk to prevent erosion and sedimentation problems. The amount of erosion from drip that comes off the boardwalk will be minimal. Therefore, the bridge and boardwalk will not cause a violation of state water quality standards. Off-site flooding The project will not impede conveyance of any stream, river, or other water course which would increase off-site flooding. The structures will completely span the wetland areas and flow channel, and no part of the structures, including the pilings, will lie within any water or wetland areas including the flow channel. There will be a span of 2.5 to 3 feet from the horizontal members of the bridge and boardwalk down to the ground surface which will allow water to pass through unobstructed. Further, there will not be any cross ties or horizontal obstructions on the lower portions of the boardwalk or bridge pilings. Further, due to the spacing of the pilings, the boardwalk and bridge will not trap sufficient sediment such as leaves to impede the conveyance of the flow channel. Therefore, conveyance through the flow channel will not be affected by the structures. Because the boardwalk and bridge are not over Hogtown or Possum Creeks, they will not cause any obstruction to the conveyance of the creeks. Aquatic and wetland dependent listed species The project will not adversely affect any aquatic or wetland dependent listed species. These species are defined by District rule as aquatic or wetland dependent species listed in Chapter 39-27, Florida Administrative Code, or 50 Code of Federal Regulations, Part 17. No such species are known to exist in the project area, and none are expected to exist in the location and habitat type of the project area. Therefore, contrary to Petitioners' assertions, there are no listed salamander, frog, turtle, or lizard species known to occur within the Hogtown Creek basin. Although it is possible that the box turtle may be found in the project area, it is not an aquatic or wetland dependent listed species. One baby American alligator (between two and three feet in length) was observed in the borrow pit area of the project on September 11, 1997. Except for this sighting, no other listed animal species have been observed in the project area. As to the alligator, the only area in which it could nest would be in the existing excavated borrow pit, and none of the proposed construction will take place in that area. More than likely, the alligator had walked into the area from Clear Lake, Kanapaha Prairie, or Lake Alice. The proposed structures will not affect the movement of the alligator nor its feeding habits. Drainage of wetlands Because the boardwalk and bridge are elevated structures over waters and wetlands, and the City has not proposed to construct ditches or other drainage systems, the proposed system will not cause drainage of the wetlands. Coral/macro-marine algae/grassbeds The proposed system is not located in, on, or over coral communities, macro/marine algae, or a submerged grassbed community. D. Were the Petitions Filed for an Improper Purpose? Prior to the filing of their petitions, Petitioners did not consult with experts, and they prepared no scientific investigations. Their experts were not retained until just prior to hearing. Petitioners are citizens who have genuine concerns with the project. They are mainly longtime residents of the area who fear that the Greenway will not be properly maintained by the City; it will increase flooding in the area; it will cause water quality violations; and it will attract thousands of persons who will have unimpeded access to the back yards of nearby residents. Although these concerns were either not substantiated at hearing or are irrelevant to District permitting criteria, they were nonetheless filed in good faith and not for an improper purpose.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order approving the applications of the City of Gainesville and issuing the requested permits. DONE AND ENTERED this 19th day of December, 1997, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 19th day of December, 1997. COPIES FURNISHED: Henry Dean, Executive Director St. Johns River Water Management District Post Office Box 1429 Palatka, Florida 32178-1429 Samuel A. Mutch, Esquire 2790 Northwest 43rd Street Suite 100, Meridien Centre Gainesville, Florida 32606 Jennifer B. Springfield, Esquire Mary Jane Angelo, Esquire Post Office Box 1429 Palatka, Florida 32178-1429 Richard R. Whiddon, Jr., Esquire Post Office Box 1110 Gainesville, Florida 32602-1110

Florida Laws (3) 120.57120.59517.12 Florida Administrative Code (6) 40C-4.02140C-400.47540C-41.06340C-42.02340C-42.02740C-42.029
# 4
LEAGUE OF WOMEN VOTERS OF CLEARWATER/UPPER PINELLAS COUNTY vs. FAIRFIELD FLORIDA COMPANIES AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 85-002755 (1985)
Division of Administrative Hearings, Florida Number: 85-002755 Latest Update: Feb. 14, 1986

Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that a dredge and fill permit be issued to Fairfield to fill 2.1 acres of wetlands and to create 2.1 acres of wetlands as mitigation, including the planting of Spartina to be maintained at an 80% survival rate for a period of five years and the provision of erosion control measures in and adjacent to Lake Avoca and St. Joseph's Sound. Respectfully submitted and entered this 14th day of February, 1986 in Tallahassee, Leon County, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of Feburary, 1986. APPENDIX The proposed findings of fact submitted by the Petitioner and the Respondent Fairfield have been accepted and/or incorporated in this Recommended, except as noted below: Petitioner page 3, 3rd full paragraph, Rejected; not supported last sentence: by competent substantial evidence. page 4, 1st paragraph: Rejected; contrary to the greater weight of the evidence. page 5, 1st full sentence: Accepted, but irrelevant and immaterial to disposition of any issue. pages 5 and 6, starting with Rejected; contrary to the 1st full paragraph: greater weight of the evidence. Respondent Fairfield page 4, 2nd full paragraph: Rejected; mere recitation of testimony and conclusions of law as opposed to factual findings. page 13, 1st paragraph: Rejected: irrelevant and immaterial. NOTE: Many of the proposed findings of fact submitted by the Petitioner and the Respondent Fairfield constitute either recitations of testimony or legal conclusions. While these have not technically been rejected by the undersigned, they are not appropriate for the findings of fact section and are discussed in the conclusions of law. COPIES FURNISHED: Victoria Techinkel Secretary Twin Towers Office Bldg. 2600 Blairstone Road Tallahassee, FL 32301 Mary f. Smallwood General Counsel Twin Towers Office Bldg. 2600 Blairstone Road Tallahassee, FL 32301 William W. Deane, Esquire Hanley and Deane, P.A. 465 Second Avenue North P. O. Box 7473 St. Petersburg, FL 33734 Julia D. Cobb Deborah Detzoff Richard Tucker 2600 Blairstone Road Tallahassee, FL 32301 Terry E. Lewis Steve Lewis Messer, Vickers, Caparello, French & Madsen P. O. Box 1876 Tallahassee, FL 32302 =============================================================== AGENCY FINAL ORDER =============================================================== STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION LEAGUE OF WOMEN VOTERS OF CLEARWATER-UPPER PINELLAS COUNTY, Petitioner, v. DOAH CASE NO. 85-2755 DDT OGC FILE NO. 85-0822 DEPARTMENT OF ENVIRONMENTAL REGULATION and FAIRFIELD COMMUNITIES, INC., Respondents. /

Florida Laws (4) 120.57120.68380.06403.412
# 6
JOHN SHAW vs. CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 89-001849 (1989)
Division of Administrative Hearings, Florida Number: 89-001849 Latest Update: Jul. 19, 1989

The Issue Whether Appellant was wrongfully denied a variance of 21.33 feet to construct a second floor deck at 673 Bay Esplanade, Five Palms Motel Condo, Clearwater, Florida.

Findings Of Fact John Shaw, a resident of Massachusetts, purchased the condominium for which the variance is here requested in December, 1988 without first visiting the property or inquiring about zoning restrictions. The unit purchased is on the second floor of a two story building earlier converted from a hotel or motel into condominiums. The seller told Shaw he could construct a deck over the existing deck on the ground floor condominium below the unit purchased by Shaw. While the construction of this deck was in progress it was discovered no permit had been pulled for the project and the work was stopped. The subsequent application for a permit was denied because the proposed deck encroached some 21.33 feet into the setback area. The application for a variance was denied by the Clearwater Development Code Adjustment Board and this appeal followed. The two buildings comprising this complex were erected many years ago and are non-conforming, i.e., the buildings themselves violate the current Development Code. An existing deck extending into the setback area was constructed on the unit directly below the condominium purchased by Shaw and a similar deck extending to the seawall was constructed on an adjacent building. No permits are on file for those decks. Construction of the proposed deck would improve the livability of the condominium greatly by expanding the area usable for looking seaward. The condominium has been used without this deck for many years. This property is zoned CR-24 and the setback requirement is 25 feet from the water's edge.

# 7
BRIAN DIVENTURA vs THE GABLES AT STUART AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 03-002838 (2003)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Aug. 05, 2003 Number: 03-002838 Latest Update: May 04, 2006

The Issue This case involves a third-party challenge to South Florida Water Management District's (District's) proposed issuance of Amended Environmental Resource Permit number 43- 01438-P (ERP) for conceptual approval for a surface water management (SWM) system to serve 80.71 acres of residential development known as The Gables at Stuart and 1.42 acres of the entrance road easement. The issue to be decided by the ALJ is whether The Gables at Stuart (The Gables) provided reasonable assurances that the proposed development will not be harmful to the water resources of the District, and will comply with the water quantity, environmental and water quality criteria of the District's ERP regulations set forth in Part IV of Chapter 373, Florida Statutes, in Florida Administrative Code Chapter 40E-4, and in the Basis of Review for ERP Applications (BOR) (collectively referred to as the ERP criteria).1

Findings Of Fact The Parties and Proposed Project The Gables project site is located within the jurisdictional boundaries of the District in Martin County, Section 20, Township 37 South, Range 41 E, bordered to the north by Jensen Beach Boulevard and a 18.64-acre tract of commercial property that was previously included in the proposed project. To the west and partially to the south is the Pineapple Plantation residential development, and to the east is the Pinecrest Lakes residential development. The Petitioner resides in the Pineapple Plantation development which borders the Gables site. The Gables project site contains 29.54 acres of wetlands; 26.86 of these will be preserved onsite. Additionally, the project will include a conservation easement encompassing 32.7 acres which covers both wetlands and uplands. Development on the site will cover only 28.04 acres; the remaining acreage which is not under a conservation easement will nonetheless be preserved. Wetlands 1, 2, 3, and 4, which are the larger, higher quality wetlands on the site, will be entirely preserved, except for a 0.11 acre area in the southeast corner of wetland 1, where a berm will be constructed. All direct wetland impacts will result from construction of the multi-family housing and its access road on the northern portion of the site. These wetlands are in a more degraded condition than are the wetlands to the south, which are being preserved. The site includes the alignment of the proposed “Green River Parkway” for which Martin County has submitted a permit application. Although this area and the area to the east of it will be preserved by the Gables, no mitigation credit is given by the District. In fact, portions of wetlands 5 and 6 that are east of the proposed alignment have been considered by the District as secondarily impacted due to the fragmentation and size reduction expected to result from construction of the Parkway even though they are not impacted by the Gables project itself. The site is characterized by pine flatwoods and wet prairies typical of those found along the upper edges of the Savannas in Martin and St. Lucie Counties. The Gables project site is undeveloped but has been hydrologically altered in some areas by offsite conditions. In particular, a large ditch on the west side of the Pinecrest Lakes property adjacent to the eastern boundary of the subject property presently exerts adverse hydrologic affects, as does the entire Pinecrest Lakes development. There is an existing culvert outfall across Jensen Beach Boulevard in the northwest corner of the 18.64-acre commercial property to the north. Runoff from a portion of Jensen Beach Boulevard and undeveloped portions of the West Jensen project are conveyed into the commercial property by this culvert. This runoff then flows easterly and south within the commercial property and, ultimately, under an existing unpaved road used to access two Martin County Utility potable wells located in the eastern project area. The previously referenced north-to-south ditch located along the western edge of the adjacent Pinecrest Lakes project directs this flow southerly into the Pinecrest Lakes Phase I SWM system. A ridge traversing the northern portion of the Gables project site from west to east prevents appreciable volumes of this off-site discharge from reaching wetlands south of this ridge. In general, wetlands found over the southwestern one- half of the Gables project site are in very good condition, displaying healthy and appropriate vegetation and water levels. The northeast one-half was observed to have significantly less standing water when inspected, and vegetation appeared to be transitioning to less water-tolerant species such as slash pines. The southern portion of the Gables project site consists largely of wetlands. Wetlands designated as Wetlands 4 and 7B extend off-site westerly into the neighboring Pineapple Plantation development. The northernmost 18.64 acre commercial portion of the July 2003 Gables project site has been removed. The commercial portion will require a separate permit prior to any development on that parcel. The Gables has proposed an exfiltration trench to provide runoff from its multi-family section, which is on the northern portion of the site, with dry pre-treatment equal to one-half inch over the area prior to discharge into the master SWM system. An exfiltration trench consists of buried perforated piping surrounded by gravel which allows runoff to be filtered and treated before exiting the system. The southernmost area of the Gables development is to consist of single-family residential development located in an upland peninsula in the central western portion of the overall Gables project site. This area will be surrounded by a retaining wall. Runoff from the lots and the access road within the single-family area will be directed to the wet detention lakes of the master SWM system. The master SWM system water quality and storm attenuation facilities include 2.415 acres of wet detention pond to be located in the central eastern project site area, as well as dry detention areas, swales and the exfiltration trench located within the project. Discharge from the master SWM system is into the adjacent Pinecrest Lakes development within a previously established drainage easement. The revised conceptual design for the Gables project site continues to re-route the existing historical off-site discharge from West Jensen and Jensen Beach Boulevard southward to the on-site wetlands through a dedicated culvert conveyance that will commence at the northern boundary of the revised Gables project site area. Conveyance through the formerly included commercial tract will be through existing wetlands. The master SWM system conceptual design will continue to utilize a cascading wetland system, cascading from west to east in accordance with the natural hydrology of the site, with final connection into the master SWM wet detention pond. As the Gables application is for a conceptual permit only, final construction details are not required to be presented at this time, and modifications are to be expected when the applicant files an application for a construction permit. Conditions For Issuance In order to obtain an ERP, an applicant must satisfy the conditions for issuance set forth in Rules 40E-4.301 and 40E-4.302. The Conditions for Issuance primarily focus on: a) water quantity, b) wetland environmental values, and c) water quality. Water Quantity Under Rule 40D-4.301(1), an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal, or abandonment of a surface water management system: will not cause adverse water quantity impacts to receiving waters and adjacent lands; will not cause adverse flooding to on- site or off-site property will not cause adverse impacts to existing surface water storage and conveyance capabilities. The Applicant has demonstrated through hydrological analysis, which takes into consideration the systems on the surrounding properties, the hydrologic inflow from the north, from the West Jensen project, that the proposed project will not cause flooding to on-site or off-site property. Petitioner alleged that the proposal to install a berm around wetland 7 on the Gables property would cause flooding into Pineapple Plantation. But the evidence was that Pineapple Plantation’s SWM system, as permitted, was intended to contain the runoff within the boundaries of Pineapple Plantation’s property, including the small portion of wetland 7 that straddles the property line between Pineapple Plantation and The Gables. To accomplish this, permission was obtained from Mr. Gibson to install a berm on his property. However, the berm was never installed. The Gables now proposes to install the berm that was supposed to have been there since Pineapple Plantation was permitted. The proposed berm would be established at an elevation sufficient to control runoff produced by a 25-year rainfall event and maintain the previously-established hydrologic divide. For these reasons, installation of the proposed berm, which is necessary to make The Gables' proposed SWM system function properly, will not cause adverse flooding to the Pineapple Plantation. For various other reasons, Petitioner also alleged that The Gables project will lower wetland water levels in Pineapple Plantation, as well as on the Gables property, having adverse impacts on the quality of those wetlands. Petitioner did not present any expert opinion to support his allegations. Instead, he primarily pointed out what he termed "anomalies" in the permit file during cross-examination of expert witnesses for The Gables and the District. In most instances, the expert witnesses explained that Petitioner was mistaken. In every instance where Petitioner had detected an actual "anomaly," the experts explained that they were insignificant for purposes of the permitting criteria. The Gables provided reasonable assurances that it will not cause adverse impacts to existing surface water storage and conveyance capabilities through the determination of appropriate wetland control elevations which are based on wet season water levels. Petitioner raised a question regarding aquifer recharge, which is a consideration under Section 6.10(e) of the BOR, which requires the project to be designed to "preserve site ground water recharge characteristics." The project is designed so that water tables are preserved or even raised. It is also designed to preserve the significant wetland features of the site. There are large areas of contiguous areas of wetland and upland habitat which can function as groundwater recharge. The exfiltration trenches make runoff also available to the aquifer for storage. The lakes are not lined, so the water in the lake can leak out. Based on volumetric calculations, the site will have more water post-development than predevelopment. The types of regional investigations of aquifer recharge capabilities and impacts cited by Petitioner were relevant to consideration of groundwater withdrawal issues, not surface water management design. In conclusion, The Gables provided reasonable assurances that it would comply with the District rules pertaining to water quantity and flood control pursuant to Rule 40E-4.301(1)(a),(b), and (c) and the BOR. Value Of Functions Of Wetlands Rule 40E-4.301(1)(d) requires an applicant to provide reasonable assurances to demonstrate that its proposed project will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. The wetlands generally located on the north side of the Gables project site are in a more degraded condition than the wetlands to the south. Wetlands generally located over the southerly extent of the site are adequately hydrated and possess high-quality vegetation associations consisting of St. John's wort, maidencane, yellow-eyed grass, and beak rush. This habitat lends itself to utilization by a variety of wading birds, raptors, snakes, and small mammals such as raccoons, bobcats, armadillos, opossums, and feral pigs. In contrast, Wetlands 5, 6, and 7 on the north side exhibit slight-to-significant hydrologic and vegetation changes due to the adjacent Jensen Beach Boulevard and Pinecrest Lakes development to the north and east, respectively. The Gables is proposing both wetland and upland preservation. A mosaic of uplands and wetlands together enhances the value of both and provides a good habitat for wildlife. Mixing upland preservation mixture with wetland preservation increases the value of the wetlands because uplands support wetland habitat, and the “ecotone” at the edge of the upland and wetlands provides the most valuable part of the habitat. The value of preserving this area outweighs potential preservation of the less valuable wetlands to the north, which will be impacted by the multi-family portion of the project. The Gables has provided reasonable assurances to demonstrate that the value of functions provided by wetlands and other surface waters will not be adversely affected. Water Quality Rule 40E-4.301(1)(e) requires an applicant to provide reasonable assurances that the proposed project will not adversely affect the quality of receiving waters such that state water quality standards will not be violated. Section 5.2.1 of the BOR requires that retention, detention, or both retention and detention be provided in the overall system in one of the following three ways or equivalent combinations thereof: Wet detention volume shall be provided for the first inch of runoff from the developed project, or the total runoff of 2.5 inches times the percentage of imperviousness, whichever is greater. Dry detention volume shall be provided equal to 75 percent of the above amounts computed for wet detention. Retention volume shall be provided equal to 50 percent of the above amounts computed for wet detention. Retention volume included in flood protection calculations requires a guarantee of long term operation and maintenance of system bleed-down ability. The Gables has proposed an exfiltration trench system for the multi-family parcel and a lake system to handle runoff from the overflow and from the single-family portion of the project. With these facilities in place, runoff from the proposed development will be treated before any stormwater is discharged off site. Calculations were performed to ensure that the project is engineered to meet these criteria. Petitioner suggested that the project may require more exfiltration trench than in the current plans, due to compaction of the soil from construction activities, which may affect permeability. However, Petitioner presented no evidence to support this suggestion. The expert witness for the Gables explained that compaction usually affects the top two feet of the soil profile, whereas the exfiltration trenches are designed to be 4-5 feet below the ground surface and probably will function as expected. In any event, when a construction permit is sought, final testing will be performed and additional trench will be installed if necessary. The project will accommodate double the amount of exfiltration trenching in the conceptual plan. The Gables has provided reasonable assurances to demonstrate that the project will not adversely affect the quality of receiving waters such that State water quality standards will not be violated. Reduction And Elimination Section 4.2.1 BOR requires that practicable design modifications be explored to reduce or eliminate adverse impacts to wetlands and maximize functions provided by wetlands on the project site. The applicant explored all practicable alternatives in order to reduce or eliminate wetlands impact. In 2000, the Applicant proposed approximately 7.5 acres of wetland impact. In 2001, the Applicant submitted a plan to the District that preserved part of Wetland 5 and impacted the remainder of Wetland 5 by dredging a lake. The current application proposes preserving more of Wetland 5 and three smaller lakes, rather than a single lake, which has the effect of further decreasing wetland impacts The site plan was also modified to address flowage from north of Jensen Beach Boulevard to the south, thereby reducing secondary impacts to all the wetlands that are now being preserved. In addition, a retaining wall has been added around much of the development to offset secondary impacts, and additional buffers have been put in place. Finally, as noted above, the preservation of a large tract of mixed upland and wetlands is more beneficial than preservation of a small amount of degraded wetlands. Conceivably, wetland impacts could be further reduced or eliminated by further decreasing the amount of development. But given the present layout of the proposed site plan, a further reduction would not be considered practicable. Therefore, The Gables has adequately applied the reduction and elimination criteria as required by the BOR and the District's regulations. Secondary Impacts Secondary impacts are indirect impacts that are reasonably expected to occur as a result of development. Rule 40E-4.301(1)(f) and Section 4.1.1(f) of the BOR require an applicant to provide reasonable assurances that the proposed activities will not cause adverse secondary impacts to the water resources. The District conducted a secondary impact analysis and assessed secondary impacts to wetlands 5, 6, and 7. A small portion of wetland 1, which extends off-site, was also assessed as a secondary impact because approximately half an acre of it is cut off by a proposed berm. Pursuant to Subsection 4.2.7(a) of the BOR, a 25- foot buffer is required around a wetland to prevent secondary impacts. Except for the small portion of wetland 1 discussed above, wetlands 1, 2, 3, and 4 will not be secondarily impacted because each wetland has at least a 25-foot buffer and, in some cases, a retaining wall. Mitigation An applicant is required to mitigate for secondary impacts as well as for direct wetlands impacts.3 The Gables is providing a conservation easement in favor of the District to include 18.26 acres of high-quality uplands and 20.8 acres of high-quality wetlands, though mitigation credit is being allowed by the District for only 5.79 acres of the upland portion. The value and importance of a conservation easement is that it provides reasonable assurances that a resource will not be developed in the future. Inclusion of uplands in a conservation easement is particularly valuable because development of uplands ordinarily would be more likely, and because combining wetlands and uplands in a conservation easement has the effect of enhancing the value of the wetlands by encouraging their use by wildlife. Under Section 373.414, Florida Statutes, the Uniform Mitigation Assessment Method (UMAM), which is implemented through Rule Chapter 62-345, wetland impacts from the proposed project will result in 2.63 units of functional loss, while proposed mitigation will provide 2.87 units of functional gain. This UMAM analysis demonstrates that the proposed mitigation offsets wetland impacts. Petitioner questioned whether The Gables and the District properly applied Rule 62-345.600(3)(c) in determining the amount of required mitigation. Specifically, Petitioner contended that, since The Gables is not using a mitigation bank or a regional offsite mitigation area as mitigation, the acreage of mitigation required to offset wetland impacts was to be calculated by dividing functional loss (FL) by relative functional gain (RFG). However, Petitioner did not explain what the result would be if this calculation were made. Meanwhile, the expert witnesses for both the District and The Gables interpreted the language of the Rule to provide that one divides FL by RFG to determine acres of mitigation required only when one discrete area is being impacted and another discrete area is serving as mitigation, which is not the case here. According to the experts, the second sentence of subparagraph (3)(c) explains that, when there is more than one impact or mitigation assessment area, total functional loss and total RFG for each assessment area is determined by summation of the FL and RFG for each assessment area. While the language of the Rule is confusing, the expert testimony is credited and accepted as providing a logical and correct interpretation. The BOR specifically provides in Section 4.3.1.2 that mitigation is best accomplished on-site or in close proximity to the area being impacted. In this case, all of the mitigation proposed is onsite.4 Section 4.2.2 of the BOR provides that as part of the District's assessment of impacts of regulated activities upon fish and wildlife and their habitats, the District will provide notice of ERP applications to the Florida Game and Freshwater Fish Commission (now the Fish and Wildlife Commission, or FWC) for its review and comment. The FWC did not comment on the Gables at Stuart application. The U.S. Fish and Wildlife Service wrote a letter to the U.S. Army Corps of Engineers in 2003, stating that it did not object to the applicant’s wetland impacts and proposed mitigation plan for the proposed project. The Gables provided reasonable assurances that mitigation will offset all impacts to wetlands. Petitioner's Extrapolation from Well Permitting Concerns Petitioner's testimony at final hearing revealed his challenge was motivated by his belief that, because the District has denied applications for permits to withdraw substantial amounts of groundwater in the region, in part due to potential impacts on surficial aquifer and wetlands, it does not make sense to allow any impacts to wetlands in SWM permitting. However, SWM permitting is governed by the criteria discussed above, not the criteria of consumptive use permitting. In addition, the potential impacts of massive consumptive use of groundwater cannot be compared to wetland impacts of the Gables proposal. Finally, as indicated, The Gables has established water table elevations for resulting wetland systems based on the existing condition of those wetlands. In some places, The Gables has proposed to raise water levels to benefit the wetlands and raise the water table above what it has been historically, primarily along the eastern boundary of the property in the Pinecrest Lakes subdivision. This has the effect of maintaining if not raising groundwater levels.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order issuing to The Gables ERP number 43-01438-P, to expire in two years, subject to the conditions set forth in the Amended Staff Report. DONE AND ENTERED this 16th day of March, 2006, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 16th day of March, 2006.

Florida Laws (7) 120.52120.569120.5728.04373.414403.4126.10
# 8
WILLIAM PHILLIP WALLIS, JR. AND JOYCE WALLIS, ET AL. vs. TYMBER CREEK INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 78-000948 (1978)
Division of Administrative Hearings, Florida Number: 78-000948 Latest Update: Oct. 04, 1978

Findings Of Fact Respondent TCI has more than 70 homes completed or under construction in furtherance of plans to build 141 single family residences as part of Tymber Creek Phase I, a development in Volusia County. The development site is partially bounded by the Little Tomoka River, a natural body of water which is navigable in fact. The site of the construction respondent DER proposes to permit is home to wildlife of various kinds, including woodpeckers, great horned owls, herons, mussels, manatees, snakes, turtles and alligators. At the present time, boat traffic on the Little Tomoka River is negligible. The dock TCI proposes to build would have a total area of 120 square feet and would not impede the flow of the river. It would protrude over the water no more than five feet along the bank of the river at a point where the river widens, described by some of the witnesses as a lagoon, and would not constitute a hazard to navigation. With respect to the dock, the foot bridges, the boat ramp and the removal of the agreed upon portion of unauthorized fill, the permit DER proposes to issue would be before the fact. According to DER's appraisal of TCI's original, revised permit application, which was received in evidence as DER's exhibit No. 5, TCI made revised application, on November 29, 1977, for "after-the-fact approval for the placement of approximately 3500 cubic yards of fill After TCI had filled, it constructed parking and recreational facilities. In evaluating TCI's application, Steve Beeman, a DER employee, described the site in January of 1978: Approximately 1.6 acres of filled flood plain is presently covered by a sports complex including tennis courts, swimming pool and recreation building and an asphalt parking lot. An additional 3000 square feet has been filled and paved (asphalt was applied after receipt of DER cease and desist notice) for [access to] a [proposed] boatramp and parking area, and approximately 14,000 square feet of swamps have been filled in the construction of a 1800+ feet "natural trial". DER's exhibit No. 5. By letter dated February 22, 1978, respondent DER notified respondent TCI of its intent to deny TCI's initial application, as revised. Among the reasons DER gave for its intended denial were expected violations of various water quality standards, including a prohibition against oils and greases in concentrations greater than 15 mg. per liter ("or that no visible oil, defined as iridescence, be present to cause taste or odors, or interfere with other beneficial uses.") DER's exhibit No. 4. Rule 17-3.05(2)(r) , Florida Administrative Code. This water quality standard violation was anticipated because of "the [projected] focussing of stormwater runoff into the Little Tomoka River, across paved surfaces, which are high in petroleum based pollutants." DER's exhibit No. 5. In its notice of intent to issue a permit, DER proposes to authorize TCI "to realign (straighten) existing boatramp access road." DER's exhibit No. Mr. Wheeler's letter to Mr. Shirah of April 6, 1978, DER's exhibit No. 2, describes the proposed access road change as part of "discussions and agreements concerning resolution of the initial unauthorized fill and subsequent after-the- fact application." A drawing attached to this letter indicates that the contemplated alteration of the roadway would decrease the amount of paved surface to some unspecified extent. Another part of these "discussions and agreements concerned removal of some 1900 cubic yards of fill. Most of the fill designated for removal had been placed with the idea of creating a dry pathway through the marshy area separating the Little Tomoka River from an asphalt parking area. So placed, the fill dirt acts as a dike, preventing the preexisting communication between the waters of the Little Tomoka River and the waters of the adjacent marsh. At the hearing, Mr. Wheeler testified that, if revised in accordance with DER's exhibit No. 2, TCI's project would pose no threat to water quality, but he conceded that the effects of gasoline boat motors were not considered. An increase in beat traffic would likely result in an increase in oils and greases in the waters of the Little Tomoka River.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That respondent DER, deny the permit is proposed to issue to respondent TCI in letters to petitioners dated April 7, 1978. DONE and ENTERED this 23rd day of August, 1978, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Segundo J. Fernandez, Esquire Assistant General Counsel Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida Judson I. Woods, Jr., 32301 Esquire Post Office Box 1916 Ormond Beach, Florida 32074 Tymber Creek, Inc. c/o Stan Shirah Route 40 Twin River Drive Ormond Beach, Florida 32074

Florida Laws (2) 253.77403.813
# 9
GEORGE H. HODGES, JR. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-002326 (1979)
Division of Administrative Hearings, Florida Number: 79-002326 Latest Update: May 27, 1980

Findings Of Fact The proposed project involves tidal wetlands north of Atlantic Boulevard and west of the intercoastal waterway in Duval County, Florida. The proposed dredging would result in the permanent elimination of approximately 68,000 square feet of productive Juncus roemerianus marsh. The salt marsh at this proposed project site is a healthy system, serving as a nursery and feeding habitat for a variety of aquatic organisms. The salt marsh further serves in a filtrative capacity, thereby acting as a nutrient and pollution trap. Filtrative and recycling properties would be completely removed if the area were dredged. The flora of salt marshes provides the primary source of food in estuaries by producing detritus, which is utilized by a variety of consumer organisms. The project would eliminate such flora and thus cause a change in the aquatic community. The expected resultant community would be less desirable than the present community. Species of wildlife expected to utilize the site include the great blue heron, little blue heron, Louisiana heron, great egret, snowy egret, green heron, yellow-crowned night heron, black-crowned night heron, black rail, clapper rail, king rail, osprey, seaside sparrow, marsh rabbit, raccoon, Florida mink, and Eastern diamondback terrapin. Additionally, representative species dependent upon estuarine salt marshes for feeding, spawning, nursery, and refuge habitat include the Atlantic menhaden, Atlantic croaker, Southern flounder, spotted seatrout, juvenile tarpon, penaeid shrimp, and blue crab. Thus, the salt marsh at the project site provides a valuable habitat for a variety of fish and wildlife organisms, contributes to the production of detritus (a rich source of energy which supports the complex estuarine food web), and further contributes to the maintenance of Water Quality by filtering nutrients, sediments, and other pollutants from and upland runoff. The removal of the marsh at the project site would have a negative impact on the immediate area, contrary to the public interest. Additionally, the cumulative impact of the removal of commercially and biologically valuable marshes such as exist at the project site would ultimately result in a decline in fish and wildlife populations in addition to eliminating any such area's ability to naturally filter nutrients and pollutants entering or existing in the water body attendant to the salt marsh. The proposed project will cause short-term violations of the turbidity standard found in Section 17-3.05(2)(d), Florida Administrative Code (Supp. No. 81). Frequent maintenance dredging in the proposed canal will be required. The short-term violations that will occur during the initial dredging and during the subsequent maintenance dredgings will, on a cumulative basis, cause a long-term violation. The increased water depth caused by the dredging will cause inadequate flushing of the water body, resulting in long-term violations of dissolved oxygen and biochemical oxygen demand standards found in Sections 17- 3.05 (2)(e) and E)(Supp. No. 81), and 17-3.09(3)(Supp. No. 35), Florida Administrative Code. Such violations will further be increased on a short-term basis during the initial dredging activities and during maintenance dredgings. Flow in the existing creek will be altered by the artificial topographic discontinuity, causing a flow reduction. The flushing activity between the proposed channel and the receiving body of water will be substantially decreased, thereby causing solids suspension in the water column, impeded sunlight penetration, and turbidity. Pollutants would likely be absorbed by the suspended solids and be retained in the water column. Further, deleterious and toxic substances are likely to be generated and trapped in the channel. Although the area involved in the proposed project may be negligible and the loss in wildlife habitat and in filtrative capacity may not be subject to accurate measurement, clearly the proposed project would provide an adverse effect, and any proliferation of such projects would eliminate an essential wildlife habitat, an essential part of the aquatic food chain, and an essential filtration system.

Recommendation Based upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED That the Petitioner's application for a dredge and fill permit be denied. RECOMMENDED this 17th day of April, 1980, in Tallahassee, Florida. LINDA M. RIGOT Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of April, 1980. COPIES FURNISHED: C. Ray Greene, Jr., Esquire 2600 Gulf Life Tower Jacksonville, Florida 32207 Ms. Silvia Morell Alderman Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Jacob D. Varn, Esquire Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (2) 120.57253.77