Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
DELMAR WATER CORPORATION vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 76-001008 (1976)
Division of Administrative Hearings, Florida Number: 76-001008 Latest Update: Jun. 15, 1977

Findings Of Fact This application is a request for a consumptive water use permit for six wells at the following locations: LATITUDE LONGITUDE 28 degrees 20' 50" 82 degrees 41' 36" (hereinafter referred to as Garden Terrace No.1) 28 degrees 20' 50" 82 degrees 41' 35" (hereinafter referred to as Garden Terrace No.2) 28 degrees 20' 55" 82 degrees 39' 11" (hereinafter referred to as Parkwood Acres No.1) 28 degrees 21' 20" 82 degrees 39' 11" (hereinafter referred to as Parkwood Acres No.2) 28 degrees 21' 49" 82 degrees 38' 56" (hereinafter referred to as New Well No.1) 28 degrees 21' 50" 82 degrees 38' 56" (hereinafter referred to as New Well No.2) Although included in the application, it appears from the record of this proceeding that Garden Terrace No. 1 is to be abandoned by applicant upon completion of its new facilities and therefore is not intended for inclusion in any consumptive water use permit issued pursuant hereto. Further, it appears from the records that the applicant intends to use Garden Terrace No. 2 as an emergency standby supply well only and therefore its average daily withdrawal as reflected on the application is not intended to be included in a consumptive water use permit issued pursuant hereto. Therefore, with those amendments the application seeks, from a total of five wells, a maximum daily withdrawal of 1,501,000 gallons and an average daily withdrawal of 650,000 gallons. The use of this water is for public water supply and appears to be a reasonable, beneficial use consistent with the public interest and not interfering with any legal use of water existing at the time of the application. Further, according to testimony of the staff of the Southwest Florida Water Management District it does not appear that any of the matters set forth in Subsection 16J-2.11(2), (3) or (4), F.S., exist so as to require the denial of this permit. The staff recommendation is that this permit be granted for a maximum daily withdrawal of 1.50 million gallons per day and an average daily withdrawal of .650 million gallons per day. The staff recommendations are subject to the following conditions: That all individual connections to the system be metered. That the permittee shall install totalizing flow meters of the propeller driven type on all withdrawal points covered by this permit with the exception of those wells which are currently gaged together using a single meter. That the permittee shall submit to the District a record of his pumpage for each meter. Said pumpage shall be read on a monthly basis and submitted quarterly to the District by April 15, July 15, October 15, and January 15, for each preceding calendar quarter. That the permittee have water samples from all wells permitted analyzed for chloride on a monthly basis and results submitted to the District by April 15, July 15, October 15 and January 15 for each preceding calendar quarter. That to promote good water management and avoid salt water intrusion that the water be withdrawn at an average of .217 million gallons per day from each of the three following wells: Parkwood Acres Well No. 1, Parkwood Acres Well No. 2, and New Well No. 1. New Well No. 2 shall be operated only to meet peak demand. That Garden Terrace Well No. 2 be used only as an emergency standby well. The applicant entered no objections to the conditions set forth above nor were there any objections from members of the public to the issuance of this consumptive water use permit.

Recommendation It is hereby RECOMMENDED that a consumptive use permit be issued for the five subject wells for the withdrawal of 1.30 mgd maximum daily withdrawal and .65 mgd, average daily withdrawal subject to the conditions set forth in paragraph 4 above. DONE and ORDERED this 15th day of July, 1976, in Tallahassee, Florida. CHRIS H. BENTLEY, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Jay T. Ahern, Esquire Southwest Florida Water Management District P.O. Box 457 Brooksville, Florida 33512 Delmar Water Corporation 731 West Main Street New Port Richey, Florida 33552

# 1
CHARLES W. AND BRENDA N. WALTER vs CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 93-007068 (1993)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Dec. 13, 1993 Number: 93-007068 Latest Update: Apr. 06, 1994

The Issue The issue in this case is whether the evidence sustains the decision of the City of Clearwater Development Code Adjustment Board (the Board) to grant the application of the Appellant, the City of Clearwater for dock length, width and setback variances to allow the reconstruction of the public pier facility located at the west end of Magnolia Drive in Clearwater, Florida. (The pier was destroyed by the "No Name Storm of the Century" on March 12-13, 1993.)

Findings Of Fact On or about September 1, 1993, the City of Clearwater applied to the City of Clearwater Development Code Adjustment Board (the Board) for dock length, width and setback variances to reconstruct the public pier facility located at the west end of Magnolia Drive in Clearwater, Florida, where it terminates at the waterfront in an "aquatic lands/coastal zoning district." The pier was 91.5 feet in length and 40 feet in width; it was set back 12.5 feet from the extension of the adjacent property lines. It was destroyed by the "No Name Storm of the Century" on March 12-13, 1993. Since the site has 65 feet of waterfront, reconstructing it to its previous dimensions requires variances of: (1) 59 feet in dock length (over the 32.5 feet allowed by the City of Clearwater Development Code); (2) 17.25 feet in dock width (over the 22.75 feet allowed by the Code); and (3) 7.5 feet reduction in setback from the extended adjacent property lines (below the 20 feet required by the Code.) Before its destruction, the public pier at the west end of Magnolia Drive in Clearwater had been in existence for many years. (The original version was built in approximately 1915.) The evidence is that the community at large desires to reconstruct the pier to its former dimensions. The old pier has historic and sentimental significance. It also serves as a recreational facility for residents without private access to a dock on the waterfront. Especially in the last several years before its destruction, public use of the old pier brought with it problems of misuse, loitering, litter, noise, trespassing, and crime. The police did not have the resources to prevent these problems. Criminal activity in the area seems to have decreased since the destruction of the old pier. As a result, the property owners closest to the pier do not want the public pier reconstructed at all, and certainly do not want it reconstructed to its former dimensions. They oppose the variance application. The conditions imposed by the Board (no deviation from the proposed materials and building plan, the erection of signs as to closing times to be enforced by the police, proper lighting, and the installation of an electronic safety system, including a gate, to be monitored by the police) will help alleviate many of the concerns of the neighboring property owners but are not guaranteed to eliminate them in their entirety. The water is shallow in the vicinity of the site, and a dock of a certain length is necessary for the dock to be used for boats of any appreciable size and draft. However, this condition is not unique to the particular site in question, but is uniformly applicable all along the City waterfront, and there was no evidence as to the length of dock required for adequate water depth for use by boats. There is no competent, substantial evidence in the record from which it could be found that the granting of the variances will not be materially detrimental or injurious to other property or improvements in the neighborhood in which the property is located. There is no competent, substantial evidence in the record from which it could be found that the granting of the variance will not impair the value of surrounding property.

Florida Laws (1) 17.25
# 2
SUMTER CITIZENS AGAINST IRRESPONSIBLE DEVELOPMENT, INC.; KENNETH ROOP; AND AUBREY VARNUM vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND VILLAGES WATER CONSERVATION AUTHORITY, 02-001124 (2002)
Division of Administrative Hearings, Florida Filed:Bushnell, Florida Mar. 20, 2002 Number: 02-001124 Latest Update: Aug. 12, 2002

The Issue Whether proposed Water Use Permits Nos. 20012236.000 (the Potable Water Permit) and 20012239.000 (the Irrigation Permit) and proposed Environmental Resource Permit No. 43020198.001 (the ERP) should be issued by the Respondent, Southwest Florida Water Management District (the District).

Findings Of Fact The Parties The individual Petitioners, Farnsworth, Roop, and Varnum are all Florida citizens and residents of Sumter County. None of the individual Petitioners offered any evidence relating to direct impacts that the ERP would have on their property. With respect to the Potable Water and Irrigation Permits, anecdotal testimony was presented by Petitioners and Wing and Weir relating to well failures and sinkholes in the area. Two Petitioners, Roop and Varnum, live in close proximity to the property encompassed by the three permits. Petitioner Farnsworth’s property is approximately three and a half miles from the project boundary. Wing and Weir live approximately four and a half to five and 18 miles from the project site, respectively. SCAID is a Florida not-for-profit corporation that has approximately 130 members. Farnsworth, the president of SCAID, identified only Roop and Varnum as members who will be directly affected by the activities to be authorized by the permits. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries. The Utility and the Authority are limited liability companies, of which the Villages Inc. is the managing partner. The Villages Inc. is a Florida corporation. The Utility, which will serve as a provider of potable water, is regulated by the Public Service Commission, while the Authority which will provide irrigation water, is not. The Villages Inc., Development The Villages Inc. is a phased, mixed use, retirement community, which is located at the intersecting borders of Lake, Marion, and Sumter Counties. Development has been on going since at least 1983, with a current planning horizon of the year 2019. Currently, there are 15,362 constructed dwelling units in the built-out portion of the Villages Inc. that are located in Lake County and the extreme northeast corner of Sumter County. The portion located in Marion County is 60 percent complete, with 750 homes completed and another 600 under construction. Approximately another 22,000 residences are planned for development in Sumter County by the year 2012, with an additional 10,200 by the year 2019. However, the Potable Water and Irrigation Permits are only for a six-year duration, and the ERP has a duration of only six years. None of the permits authorize development activities beyond that time frame. Generally speaking, the three permits at issue include an area owned by the Villages Inc. that lies in northeast Sumter County South of County Road 466 and North of County Road 466A. However, it is not projected that this entire area will be built-out during the terms of three proposed permits. Area Hydrology and Topography In the area of the Villages Inc., there is a layer of approximately five to ten feet of sand at the land surface, which is underlain by ten to 70 feet of a clayey sand. Both of these constitute the surficial aquifer and are extremely leaky, allowing water to percolate easily through to a lower layer. Except in the vicinity of Lake Miona, there is no water in the surficial aquifer except after rainfall events. The clayey sand layer is underlain by the Upper Floridan, a limestone unit. The top of this limestone layer ("the top of the rock") occurs at fluctuating depths of between 30 and 70 feet. At approximately 350 to 400 feet below the land surface, there begins a transition to a denser unit that serves as a confining layer between the Upper Floridan production zone and the Lower Floridan production zone. This confining layer, which was confirmed by drilling at three locations in the Villages Inc. is approximately 150 feet thick in the area of the Villages Inc. Another transition, this time to a less dense formation, begins at approximately 550 to 600 feet, which is considered the top of the Lower Floridan production zone. While testing conducted on the project site indicated almost no leakage between the Upper and Lower Floridan production zones, it is generally known by experts that there is some exchange of water between the two layers. Both the Upper and the Lower Floridan contain water that meets potable water standards and both are considered water production zones. The water quality of the two zones is not significantly different. The project area is prone to karst activity, that is, the formation of sinkholes. Sinkholes are formed as a result of the collapse of the overburden above subsurface cavities which have been formed through a very gradual dissolution of limestone, thus resulting in a "sink" at the land surface. Surface water bodies in the area include Lake Miona, Black Lake, Cherry Lake, and Dry Prairie, as well as several other small wetlands. The Potable Water and Irrigation Permits The potable water permit is for the withdrawal from the Upper Floridan Aquifer of 1.164 million gallons of water per day (MGD), on an annual average, for potable use in residences and both commercial and recreational establishments. It also limits the maximum withdrawal during peak months to 2.909 MGD. The Irrigation Permit is for the withdrawal from the Lower Floridan Aquifer of 2.850 MGD, on an annual average, for use in irrigation. The peak month usage rate permissible under the proposed permit would be 9.090 MGD. Water withdrawal under the Irrigation Permit will be used for the irrigation of residential lawns, common areas, commercial landscaping, and golf courses. Modeling of Drawdowns In assessing the impacts of proposed water withdrawals from an aquifer, District personnel considered effects on the aquifers and on-surface water features in the area. Computer- generated models of the predicted effects of the Potable Water and Irrigation Permits withdrawals provided one of the principal bases for this assessment. The primary geologist assigned to review the permit applications reviewed two of the models submitted by the Utility and the Authority (jointly the WUP Applicants) and ran one personal model of her own in order to predict the effects of the proposed withdrawals on the aquifers, as well as on any wetlands and other surface water bodies. In particular, the models predict both the vertical and horizontal extent to which the withdrawals may lower the level of water within the aquifers and in-surface waters under various conditions. One of the models submitted by the WUP Applicants predicted drawdowns during a 90-day period of no rainfall while the other predicted the impacts of the withdrawals over the life of the permits, considered cumulatively with the effects of withdrawals from the already-existing Villages' development in Sumter, Marion, and Lake Counties. The District’s geologist modeled the impacts of the withdrawals over the life of the permits and included the cumulative effects of all of the current Villages' withdrawals in Sumter County. All of these models included the combined effects of both the proposed Potable Water and the Irrigation Permits. Based upon these models, it is concluded that there will be no significant drawdowns as a result of the withdrawals authorized by the proposed water use permits. Specifically, the only predicted drawdown in the surficial aquifer (0.25 feet of drawdown) is in an area where there are no natural surface water features. Drawdown in the Upper Floridan is predicted at between 0.1 and 0.2 feet, while the drawdown in the Lower Floridan is predicted at a maximum of 1.5 feet. These minor drawdowns are not expected to cause any adverse impacts. Transmissivity is the rate at which water moves horizontally through the aquifer. In areas with high transmissivity, the results of water withdrawals from an aquifer will generally be low in magnitude, but broad in lateral extent. Water withdrawals from areas of low transmissivity will result in cones of depression that are more limited in lateral extent, but steeper vertically. The use of too high a transmissivity rate in a model, would overpredict the horizontal distance of the drawdowns caused by withdrawals, but would underpredict the vertical drawdown in the immediate vicinity of the withdrawal. Conversely, use of too low a transmissivity would over-predict the effects in the immediate vicinity of the withdrawal but underpredict the lateral extent of the drawdown. The WUP Applicants’ models used a transmissivity value for the Lower Floridan Aquifer of 100,000 feet squared per day ("ft.2/d'). The WUP Applicants’ consultant derived the transmissivity values from a regional model prepared by the University of Florida. The regional model uses a transmissivity value for the entire region of 200,000 ft.2/d for the Lower Floridan. While that transmissivity is appropriate for assessing large-scale impacts, on a more localized level, the transmissivity of the aquifer may be lower. Therefore, the WUP Applicants’ consultant met with District representatives and agreed to use a value half that used in the University of Florida model. A similar approach was used for the transmissivity value used in modeling effects in the Upper Floridan. Notably, specific transmissivity values recorded in four wells in the Villages Inc. area were not used because two of these wells were only cased to a depth of just over 250 feet, with an open hole below that to a depth of 590 feet. Thus, the transmissivity measured in these wells reflect conditions in the confining layer at the immediate location of the wells - not the transmissivity of the Lower Floridan production zone. Further, site-specific information on transmissivity, measured during pump tests at individual wells, does not correlate well to the transmissivity of the aquifer, even at short distances from the well. Transmissivities measured at individual wells are used to determine the depth at which the pump should be set in the well, not to determine the transmissivity of the aquifer. Thus, the use of transmissivities derived from the regional model, but adjusted to be conservative, is entirely appropriate. Moreover, using a transmissivity in her modeling of the project impacts of 27,000 ft.2/d for the Lower Floridan Aquifer, the district geologist’s model predicted no adverse impacts. Leakance is the measure of the resistance of movement vertically through confining units of the aquifer. The leakance value used by the District for the confining layer between the Upper and Lower Floridan was taken from the University of Florida model. Tests conducted on the site actually measured even lower leakance values. Thus, the evidence establishes that the leakance value used in the WUP Applicants’ and the District’s modeling for the Floridan confining layer was reasonable and appropriate. Competent, substantial evidence also establishes that the leakance value used for Lake Miona was reasonable. The WUP Applicants submitted to the District substantial data, gathered over several years, reflecting the balance of water flowing into Lake Miona and the lake’s levels in relation to the potentiometric surface. This documentation verified the leakance value used for Lake Miona in the modeling. Finally, the District modeling used appropriate boundary condition parameters. The District modeling used what is known as the "constant head" boundary and assumes the existence of water generated off-site at the boundaries. Such a boundary simulates the discharge of the aquifer at a certain level. The use of constant head boundaries is an accepted practice. The modeling conducted on behalf of the District and the Applicants provides a reasonable assurances that the Potable Water and Irrigation Permits will not cause adverse water quality or quantity changes to surface or groundwater resources, will not cause adverse environmental impacts to natural resources, and will not cause pollution of the aquifer. Furthermore, because the predicted drawdowns are so insignificant, reasonable assurances have been provided that the withdrawals will not adversely impact existing off-site land uses or existing legal withdrawals. The modeling also provides reasonable assurances that the withdrawals will not be harmful to the water resources of the District. Moreover, monitoring requirements included in the proposed Potable Water and Irrigation Permits provide additional reasonable assurance that – should the withdrawal effects exceed those predicted by the modeling – such effects are identified and necessary steps are taken to mitigate for any potential impacts. The District has reserved the right to modify or revoke all or portions of the water use permits under certain circumstances. Specifically, the proposed Potable Water Permit requires a monitoring plan that includes the following pertinent provisions: There shall be no less than three control wetland and ten onsite wetland monitoring sites; A baseline monitoring report, outlining the current wetland conditions; * * * A statement indicating that an analysis of the water level records for area lakes, including Miona Lake, Black Lake, Cherry Lake, Lake Deaton and Lake Griffin, will be included in the annual report; A statement indicating that an analysis of the spring flow records for Gum Spring, Silver Spring, and Fenney Spring, will be included in the annual report; * * * Wildlife analyses for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods to determine success of the mitigation; A mitigation plan for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods and thresholds to determine success of the mitigation; An annual report of an analysis of the monitoring data . . . . Similar provisions are included in the proposed irrigation permit. The WUP Applicants, in conjunction with the District, have developed sites and methodologies for this monitoring. Reasonable Demand The water to be withdrawn under the proposed Potable Water Permit will serve 10,783 people. This total results from the simple multiplication of the number of residences to be built during the next six years (5,675) by the average number of residents per household (1.9). Those numbers are based upon historical absorption rates within the Villages Inc. development since 1983, an absorption rate that doubles approximately every five years. The Utility proposed a per capita use rate of 108 gallons per day for potable use only. District personnel independently verified that per capita rate, based upon current usage in the existing portions of the Villages Inc. and determined that the rate was reasonable. Based upon the population projections and the per capita rate, the District determined that there is a reasonable demand for the withdrawal of the amount of water, for potable purposes, that is reflected in the Potable Water Permit. The Utility has provided reasonable assurance regarding the Utility’s satisfaction of this permitting criterion. As to the irrigation permit, the Villages Inc. plans, within the next six years, to complete the construction of 1,911 acres of property that will require irrigation. The amount of water originally requested by the Authority for irrigation withdrawals was reduced during the course of the application process at the request of the District. The District determined the reasonable amount of irrigation water needed through the application of AGMOD, a computer model that predicts the irrigation needs of various vegetative covers. Since the Authority intends to utilize treated wastewater effluent as another source of irrigation water, the District reduced the amount of water that it would permit to be withdrawn from the Lower Floridan for irrigation. The District, thus, determined that the Authority would need 1.59 MGD annual average for recreational and aesthetic area irrigation and 1.26 MGD annual average for residential lawn irrigation, for a total of 2.85 MGD. The Villages Inc. also plans to accumulate stormwater in lined ponds for irrigation use. However, unlike its treatment of wastewater effluent, the District did not deduct accumulated stormwater from the amount of water deemed necessary for irrigation. This approach was adopted due to the inability to predict short-term rainfall amounts. The uncontroverted evidence of record establishes reasonable assurances that there is a reasonable demand for the amount of water to be withdrawn under the proposed irrigation permit. Conservation and Reuse Measures Both the Utility and the Authority applications included proposed measures for the conservation and reuse of water. The conservation plan submitted in conjunction with the irrigation permit application provides for control valves to regulate both the pressure and timing of irrigation by residential users; contractual restrictions on water use by commercial users; xeriscaping; and an irrigation control system for golf course irrigation that is designed to maximize the efficient use of water. In addition, in the proposed permits, the District requires the Utility and the Authority to expand upon these conservation measures through such measures as educational efforts, inclined block rate structures, and annual reporting to assess the success of conservation measures. The Authority also committed to reduce its dependence on groundwater withdrawals through the reuse of wastewater effluent, both from the on-site wastewater treatment facility and through contract with the City of Wildwood. Reasonable assurances have been provided that conservation measures have been incorporated and that, to the maximum extent practicable, reuse measures have been incorporated. Use of Lowest Available Quality of Water In addition to the reuse of treated wastewater effluent, the Authority intends to minimize its dependence on groundwater withdrawals for irrigation use through the reuse of stormwater accumulated in lined ponds. Thirty-one of the lined stormwater retention ponds to be constructed by the Villages Inc. are designed as a component of the irrigation system on-site. Ponds will be grouped with the individual ponds within each group linked through underground piping. There will be an electronically controlled valve in the stormwater pond at the end of the pipe that will be used to draw out water for irrigation purposes. These lined stormwater ponds serve several purposes. However, the design feature that is pertinent to the reuse of stormwater for irrigation is the inclusion of additional storage capacity below the top of the pond liner. No groundwater will be withdrawn for irrigation purposes unless the level of stormwater in these lined ponds drops below a designed minimum irrigation level. Groundwater pumped into these ponds will then be pumped out for irrigation. Thus, the use of groundwater for irrigation is minimized. The Authority has met its burden of proving that it will use the lowest quality of water available. With respect to the potable permit, the evidence establishes that there are only minor differences between the water quality in the Upper Floridan and Lower Floridan in this area. The Upper Floridan is a reasonable source for potable supply in this area. Thus, reasonable assurances have been provided by the Utility that it will utilize the lowest water quality that it has the ability to use for potable purposes. Waste of Water In regard to concerns that the design of the Villages Inc.'s stormwater/irrigation system will result in wasteful losses of water due to evaporation from the surface of the lined ponds, it must be noted that there are no artesian wells relating to this project and nothing in the record to suggest that the groundwater withdrawals by either the Utility or the Authority will cause excess water to run into the surface water system. Additionally, the evidence establishes that, to the extent groundwater will be withdrawn from the Lower Floridan and pumped into lined stormwater ponds, such augmentation is not for an aesthetic purpose. Instead, the groundwater added to those ponds will be utilized as an integral part of the irrigation system and will be limited in quantity to the amount necessary for immediate irrigation needs. Finally, the water to be withdrawn will be put to beneficial potable and irrigation uses, rather than wasteful purposes. Under current regulation, water lost from lined stormwater ponds through evaporation is not considered as waste. Thus, the Authority and the Utility have provided reasonable assurances that their withdrawals of groundwater will not result in waste. The ERP The stormwater management system proposed by the Villages Inc. will eventually serve 5,016 acres on which residential, commercial, golf course, and other recreational development will ultimately be constructed. However, the proposed permit currently at issue is preliminary in nature and will only authorize the construction of stormwater ponds, earthworks relating to the construction of compensating flood storage, and wetland mitigation. Water Quality Impacts The stormwater management system will include eight shallow treatment ponds that will be adjacent to Lake Miona and Black Lake and 45 lined retention ponds. Thirty-one of these lined ponds will serve as part of the irrigation system for a portion of the Villages Inc.'s development. All of these ponds provide water quality treatment. The unlined ponds will retain the first one inch of stormwater and then overflow into the lakes. The ponds provide water quality treatment of such water before it is discharged into the lakes. The water quality treatment provided by these ponds provides reasonable assurances that the project will not adversely impact the water quality of receiving waters. While they do not discharge directly to surface receiving waters, the lined retention ponds do provide protection against adverse water quality impacts on groundwater. There will be some percolation from these ponds, from the sides at heights above the top of the liner. However, the liners will prevent the discharge of pollutants through the highly permeable surface strata into the groundwater. The Villages Inc. designed the system in this manner in response to concerns voiced by the Department of Environmental Protection during the DRI process regarding potential pollutant loading of the aquifer at the retention pond sites. Furthermore, by distributing the accumulated stormwater - through the irrigation system - over a wider expanse of vegetated land surface, a greater degree of water quality treatment will be achieved than if the stormwater were simply permitted to percolate directly through the pond bottom. There is no reasonable expectation that pollutants will be discharged into the aquifer from the lined ponds. If dry ponds were used, there would be an accumulation of pollutants in the pond bottom. These measures provide reasonable assurances that there will be no adverse impact on the quality of receiving waters. Water Quantity Impacts With regard to the use of lined retention ponds, as part of the Villages Inc.’s stormwater system and the impact of such ponds on water quantity, the evaporative losses from lined ponds as opposed to unlined ponds is a differential of approximately one (1) inch of net recharge. The acreage of the lined ponds - even measured at the very top of the pond banks - is only 445 acres. That differential, in terms of a gross water balance, is not significant, in view of the other benefits provided by the lined ponds. As part of the project, wetlands will be created and expanded and other water bodies will be created. After rainfalls, these unlined ponds will be filled with water and will lose as much water through evaporation as would any other water body. The design proposed by the Villages Inc., however, will distribute the accumulated stormwater across the project site through the irrigation of vegetated areas. The documentation submitted by the Villages Inc. establishes that the ERP will not cause adverse water quantity impacts. The Villages Inc. has carried its burden as to this permitting criterion. Flooding, Surface Water Conveyance, and Storage Impacts Parts of the project are located in areas designated by the Federal Emergency Management Administration (FEMA) as 100-year flood zones. Specifically, these areas are located along Lake Miona, Black Lake, between Black Lake and Cherry Lake, and at some locations south of Black Lake. Under the District’s rules, compensation must be provided for any loss of flood zone in filled areas by the excavation of other areas. The District has determined, based upon the documentation provided with the Villages Inc.’s application, work on the site will encroach on 871.37 acre feet of the FEMA 100-year flood zone. However, 1,051.70 acre feet of compensating flood zone is being created. The Villages Inc. proposes to mitigate for the loss of flood zone primarily in the areas of Dry Prairie and Cherry Lake. At present, Cherry Lake is the location of a peat mining operation authorized by DEP permit. Mining has occurred at that site since the early 1980s. The flood zone mitigation proposed by the Villages Inc. provides reasonable assurance that it will sufficiently compensate for any loss of flood basin storage. The Villages Inc.'s project provides reasonable assurance that it will neither adversely affect surface water storage or conveyance capabilities, surface or groundwater levels or surface water flows nor cause adverse flooding. Each of the 45 retention ponds to be constructed on-site will include sufficient capacity, above the top of the pond liner, to hold a 100-year/24-hour storm event. This includes stormwater drainage from off-site. In addition, these ponds are designed to have an extra one foot of freeboard above that needed for the 100-year/24-hour storm, thus providing approximately an additional 100 acres of flood storage beyond that which will be lost through construction on-site. Furthermore, the Villages Inc. has proposed an emergency flood plan. In the event of a severe flood event, excess water will be pumped from Dry Prairie, Cherry Lake, and Lake Miona and delivered to the retention ponds and to certain golf course fairways located such that habitable living spaces would not be endangered. Environmental Impacts and Mitigation There are 601 acres of wetlands and surface waters of various kinds in the Villages Inc.’s project area. Forty-one acres of wetlands will be impacted by the work that is authorized under the ERP. Each of these impacted wetlands, along with the extent of the impact, is listed in the ERP. The impacts include both fill and excavation and all will be permanent. When assessing wetland impacts and proposed mitigation for those impacts, the District seeks to ensure that the activities proposed will not result in a net loss of wetland functionality. The object is to ensure that the end result will function at least as well as did the wetlands in their pre-impact condition. Functional value is judged, at least in part, by the long term viability of the wetland. While small, isolated wetlands are not completely without value, large wetland ecosystems – which are less susceptible to surrounding development – generally have greater long-term habitat value. The District’s policy is that an applicant need not provide any mitigation for the loss of habitat in wetlands of less than 0.5 acre, except under certain limited circumstances, including where the wetland is utilized by threatened or endangered species. Some wetlands that will be impacted by the Villages Inc.’s project are of high functional value and some are not as good. The Villages Inc. proposes a variety of types of mitigation for the wetlands impacts that will result from its project, all of which are summarized in the ERP. In all, 331.55 acres of mitigation are proposed by the Villages Inc. First, the District proposes to create new wetlands. Approximately 11 acres of this new wetland will consist of a marsh, which is to be created east of Cherry Lake. Second, it proposes to undertake substantial enhancement of Dry Prairie, a 126-acre wetland. Currently – and since at least the early nineties – Dry Prairie received discharge water from the peat mining operation at Cherry Lake. Without intervention, when the mining operations stop, Dry Prairie would naturally become drier than it has been for several years and would lose some of the habitat function that it has been providing. The Villages Inc.’s proposed enhancement is designed to match the current hydroperiods of Dry Prairie, thus ensuring its continued habitat value. Third, the Villages Inc. has proposed to enhance upland buffers around wetlands and surface waters by planting natural vegetation, thus providing a natural barrier. Placement of these buffers in conservation easements does not provide the Villages Inc. with mitigation credit, since a 25-foot buffer is required anyway. However, the District determined that the enhancement of these areas provided functional value to the wetlands and surface waters that would not be served by the easements alone. Fourth, the Villages Inc. will place a conservation easement over certain areas, including a 1500-foot radius preserve required by the Fish and Wildlife Conservation Commission (FWCC) around an identified eagles’ nest. These areas will also be used for the relocation of gopher tortoises and, if any are subsequently located, of gopher frogs. While the Villages Inc. is also performing some enhancement of this area, it will receive no mitigation credit for such enhancement – which was required to meet FWCC requirements. However, since the conservation easement will remain in effect in perpetuity, regardless of whether the eagles continue to use the nest, the easement ensures the continued, viability of the area’s wetlands and provides threatened and endangered species habitat. In order to provide additional assurances that these mitigation efforts will be successful, the District has included a condition in the proposed permit establishing wetland mitigation success criteria for the various types of proposed mitigation. If these success criteria are not achieved, additional mitigation must be provided. With the above described mitigation, the activities authorized under the ERP will not adversely impact the functional value of wetlands and other surface waters to fish or wildlife. The Villages Inc. has met its burden of providing reasonable assurances relating to this permit criterion. Capability of Performing Effectively The Villages Inc. has also provided reasonable assurances that the stormwater management system proposed is capable of functioning as designed. The retention ponds proposed are generally of a standard-type design and will not require complicated maintenance procedures. In its assessment of the functional capability of the system, the District did not concern itself with the amount of stormwater that the system might contribute for irrigation purposes. Rather, it focused its consideration on the stormwater management functions of the system. The question of the effectiveness of the system for irrigation purposes is not relevant to the determination of whether the Villages Inc. has met the criteria for permit issuance. Consequently, the record establishes that the documentation provided by the Villages Inc. contains reasonable assurances that the stormwater system will function effectively and as proposed. Operation Entity The Villages Inc. has created Community Development District No. 5 (CDD No. 5), which will serve as the entity responsible for the construction and maintenance of the stormwater system. CDD No. 5 will finance the construction through special revenue assessment bonds and will finance maintenance through the annual assessments. Similar community development districts were established to be responsible for earlier phases of the Villages Inc. The ERP includes a specific condition that, prior to any wetlands impacts, the Villages Inc. will either have to provide the District with documentation of the creation of a community development district or present the District with a performance bond in the amount of $1,698,696.00. Since the undisputed testimony at hearing was that CDD No. 5 has, in fact, now been created, there are reasonable assurances of financial responsibility. Secondary and Cumulative Impacts The Villages Inc.’s application also provides accurate and reliable information sufficient to establish that there are reasonable assurances that the proposed stormwater system will not cause unacceptable cumulative impacts upon wetlands or other surface waters or adverse secondary impacts to water resources. The system is designed in a manner that will meet water treatment criteria and there will be no secondary water quality impacts. Further, the use of buffers will prevent secondary impacts to wetlands and wetland habitats and there will be no secondary impacts to archeological or historical resources. In this instance, the stormwater system proposed by the Villages Inc. will function in a manner that replaces any water quantity or water quality functions lost by construction of the system. In its assessment of the possible cumulative impacts of the system, the District considered areas beyond the bounds of the current project, including the area to the south that is currently being reviewed under the DRI process as a substantial deviation. The District’s environmental scientist, Leonard Bartos, also reviewed that portion of the substantial deviation north of County Road 466A, in order to determine the types of wetlands present there. Furthermore, the District is one of the review agencies that comments on DRI and substantial deviation applications. When such an application is received by the District’s planning division, it is routed to the regulatory division for review. The District includes its knowledge of the DRIs in its determination that there are no cumulative impacts. Reasonable assurances have been provided as to these permitting criteria. Public Interest Balancing Test Because the proposed stormwater system will be located in, on, and over certain wetlands, the Villages Inc. must provide reasonable assurances that the system will not be contrary to the public interest. This assessment of this permitting criteria requires that the District balance seven factors. While the effects of the proposed activity will be permanent, the Villages Inc. has provided reasonable assurances that it will not have an adverse impact on the public health, safety, or welfare; on fishing or recreational values; on the flow of water; on environmental resources, including fish and wildlife and surface water resources; or on off-site properties. Furthermore, the District has carefully assessed the current functions being provided by the affected wetland areas. With respect to historical or archeological resources, the Villages Inc. has received letters from the Florida Department of State, Division of Historical Resources, stating that there are no significant historical or archeological resources on the project site that is the subject of this permit proceeding. Thus, the evidence establishes reasonable assurances that the Villages Inc.'s stormwater system will not be contrary to the public interest. Additionally, the District and Applicant presented uncontroverted evidence that the proposed project will not adversely impact a work of the District, and that there are no applicable special basin or geographic area criteria.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is: RECOMMENDED that a final order be entered issuing Water Use Permit Nos. 20012236.000 and 20012239.000 and Environmental Resource Permit No. 43020198.001, in accordance with the District’s proposed agency action. DONE AND ENTERED this 24th day of June, 2002, in Tallahassee, Leon County, Florida. DON W. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of June, 2002.

Florida Laws (5) 120.569120.57373.203380.06403.412
# 4
BEN POSDAL vs. CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 86-003695 (1986)
Division of Administrative Hearings, Florida Number: 86-003695 Latest Update: Feb. 17, 1987

Findings Of Fact Ben A. Posdal is the owner of property commonly known as 166 Brightwater Drive, in the City of Clearwater, Florida. On August 7, 1986, he applied for variances to construct two wooden decks on his property, located at the above address. The property which is the subject of the variance request is a building which contains four apartments, which are rented by Ben A. Posdal to various tenants. On August 28, 1986, the Development Code Adjustment Board (DCAB) denied the variance requested by Mr. Posdal on the grounds that he had not demonstrated a hardship and that he had not demonstrated that the requested variance would not violate the general spirit and intent of the Clearwater Land Development Code. On September 9, 1986, an appeal was filed by Ben A. Posdal from the decision of the Development Code Adjustment Board. The appeal alleges that the DCAB decision was arbitrary, capricious and unreasonable on the following grounds: Other properties allegedly are in violation of the back line setback regulations; The DCAB failed to give enough evidentiary weight to photographs he submitted; and Appellant allegedly is being deprived of the beneficial use of the property in a manner commensurate with the community. There are no physical conditions which are unique to the property. There is no particular physical surroundings, shape or topographical condition that would result in an unnecessary hardship upon the Appellant. Failure to obtain a variance would not impinge upon Appellant's use of the property in any way. The record on appeal contains competent, substantial evidence to support the DCAB decision. Nonconforming uses in the area of the subject property are legal nonconforming uses.

# 5
FRENCHY'S ROCKAWAY GRILL, INC. vs CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 94-006776 (1994)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Dec. 05, 1994 Number: 94-006776 Latest Update: May 05, 1995

Findings Of Fact Petitioner, Frenchy's Rockaway Grill, Inc., is the owner and operator of a restaurant and alcoholic beverage establishment located at 7 Rockaway Street, Clearwater, Florida. Petitioner purchased the property in 1991. Michael Preston is president of Petitioner. Petitioner's establishment is immediately adjacent to the Gulf of Mexico and Clearwater beach on the west, to the north is a public parking lot, to the east is a motel, and to the south is the Clearwater Beach Hotel, which is owned and operated by Hunter Hotel Co., as indicated above. On the beach side of Petitioner's establishment there is an existing 972 sq. ft. wooden deck. The existing deck was initially constructed on or about 1987 by prior owners without receiving appropriate variance approvals. Subsequent alterations to the deck occurred between 1987 and 1991, also without appropriate variance approvals. In 1991 Charles and Ypapanti Alexiou/Anthony Alexiou, former owners of the subject property, filed an application for variance approval with the Board seeking three variances relating to the construction of the deck at the 7 Rockaway establishment. Specifically, the variances sought were: "1) 55.5 ft. to permit deck seaward of the coastal construction control line; 2) 15 ft. to permit a deck zero feet from a street right-of-way; and, 3) seven parking spaces to permit a 1,338 sq. ft. deck at 7 Rockaway Street, Miller's Replat, Lot 2 & vacated beach Drive on W and Lot 3, zoned CR 28 (resort commercial) & OS/R (open space recreation)." At public meeting on August 8, 1991, the application was considered by the Board. At that time Mr. Cline, as counsel for Hunter appeared in opposition to the application stating that approval of the variance requests would adversely impact the Clearwater Beach Hotel, that the request was for economic gain, that any hardship was self-imposed, and that development and traffic in the area was already heavy. The Board, however, granted the variance requests as to variances number 1 and number 2., and as to the third request, the Board denied the proposed 1,338 sq. ft. deck, but approved a variance of five parking spaces to permit the existing deck of 972 sq. ft. On or about July 13, 1993, a variance application was filed with the Board by Howard G. and Jean B. Hamilton and Palm Pavilion of Clearwater, Inc., seeking approval of four variances required for an 800 sq. ft. expansion of an existing deck at a restaurant at 10 Bay Esplanade, Clearwater Beach, Florida. The Palm Pavilion applicants were also represented by Mr. Cline. Like Petitioner's establishment, Palm Pavilion is a beachfront restaurant, which is located directly across the public parking lot to the north of Petitioner's establishment. Unlike Petitioner's establishment, Palm Pavilion is bordered by parking to the south and the east, and is not immediately adjacent to other buildings. On August 26, 1993, the Board granted the Palm Pavilion variance application for expansion of an existing beachfront deck with certain conditions. On October 6, 1994, Petitioner submitted its application to the Board requesting five variances required for a 650 sq. ft. expansion of the existing wooden deck at 7 Rockaway Street. Specifically, the variances sought were: 1) 13.22 ft. to permit a lot depth of 86.78 ft. where 100 ft. is required; 2) 8.2 ft. to permit it a rear setback of 6.8 ft. where 15 ft. is required; 3) 14 percent to permit 11 percent of open space where 25 percent is required; 4) three parking spaces to permit zero parking spaces where three additional are required; and, 5) 52.14 ft. to permit a structure seaward of the coastal construction control line. The subject property at 7 Rockaway Street is properly zoned CR-28 (resort commercial). Any scrivener's error indicating that the property is zoned OSC (open space recreation) has been corrected. Petitioner's restaurant, Frenchy's Rockaway Grill, is a popular beachside establishment. It is one of very few freestanding restaurants fronting the Gulf of Mexico on Clearwater Beach. Some patrons particularly enjoy dining on the open air deck adjacent to the beach. During peak hours, there is often over an hour's waiting time for tables on the deck. Petitioner is currently unable to accommodate the demand for seating on the beachside deck. Petitioner would sustain an economic benefit if more patrons could be accommodated on an expanded deck. Because of the size constraints of the lot and the establishment's location directly on the beach, development and improvement of the facility is highly restricted. The back of some residential rooms of the Clearwater Beach Hotel are immediately adjacent to the south of Petitioner's establishment. There are small bathroom windows from these residential rooms that face Petitioner's establishment. Petitioner's proposed expansion of the open air deck would place the proposed deck in very close proximity to the back of these residential hotel rooms. The City's staff reviewed the Petitioner's application and recommended approval with the following conditions: 1) the applicant shall obtain the requisite occupational license within 12 months; 2) the applicant shall obtain the necessary building permit within 6 months; 3) there shall be no outdoor entertainment and no outdoor speakers; 4) the applicant shall obtain the requisite alcoholic beverage separation distance variance from the City Commission. Petitioner agreed to the conditions recommended by staff. The recommendations of staff are not binding on the Board. In addition to the application for the five variances filed with the Board, Petitioner also filed a conditional use request with the Planning and Zoning Board. The conditional use request was approved on September 13, 1994, and imposed certain other conditions including the construction of a six foot wall on the south side of the proposed deck to buffer the adjoining hotel. Petitioner agreed to the conditions imposed by the Planning and Zoning Board.

Florida Laws (1) 120.57
# 6
JOHN SHAW vs. CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 89-001849 (1989)
Division of Administrative Hearings, Florida Number: 89-001849 Latest Update: Jul. 19, 1989

The Issue Whether Appellant was wrongfully denied a variance of 21.33 feet to construct a second floor deck at 673 Bay Esplanade, Five Palms Motel Condo, Clearwater, Florida.

Findings Of Fact John Shaw, a resident of Massachusetts, purchased the condominium for which the variance is here requested in December, 1988 without first visiting the property or inquiring about zoning restrictions. The unit purchased is on the second floor of a two story building earlier converted from a hotel or motel into condominiums. The seller told Shaw he could construct a deck over the existing deck on the ground floor condominium below the unit purchased by Shaw. While the construction of this deck was in progress it was discovered no permit had been pulled for the project and the work was stopped. The subsequent application for a permit was denied because the proposed deck encroached some 21.33 feet into the setback area. The application for a variance was denied by the Clearwater Development Code Adjustment Board and this appeal followed. The two buildings comprising this complex were erected many years ago and are non-conforming, i.e., the buildings themselves violate the current Development Code. An existing deck extending into the setback area was constructed on the unit directly below the condominium purchased by Shaw and a similar deck extending to the seawall was constructed on an adjacent building. No permits are on file for those decks. Construction of the proposed deck would improve the livability of the condominium greatly by expanding the area usable for looking seaward. The condominium has been used without this deck for many years. This property is zoned CR-24 and the setback requirement is 25 feet from the water's edge.

# 7
ROLF ROBERT vs. CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 89-002641 (1989)
Division of Administrative Hearings, Florida Number: 89-002641 Latest Update: Oct. 09, 1989

The Issue The issue in this appeal is whether the decision of the City of Clearwater Development Code Adjustment Board denying Petitioner's application for variances for certain signage on his property is supported by the evidence in the record, or whether it departs from the essential requirements of law. See Section 137.014(f)(3), City of Clearwater Land Development Code.

Findings Of Fact Petitioner is the owner of certain property located at 1923-1943 U.S. Highway 19 North, Clearwater, Florida (Section 05-29-16, M&B 23.05). This property is zoned CC (Commercial Center), and is the site of a strip shopping mall. On or about March 23, 1989, Petitioner applied for three variances for the subject property, as follows: 243 square feet to permit a total of 411 square feet of property identification signage; 13.5 feet in height to permit a 33.5 foot high pole sign; permission for a roof mounted sign. The Development Code Adjustment Board denied Petitioner's application for variances on April 13, 1989, and Petitioner timely filed this appeal of the Board's decision. Under the provisions of the City of Clearwater Land Development Code applicable to the Petitioner's property, only 168 square feet of property identification signage and pole signs not to exceed 20 feet in height would be allowed without a variance, and roof signs of any kind are prohibited unless a variance has been granted. Several months prior to Petitioner's filing for these variances, a roof sign was erected on the building located on the subject property. This roof sign consists of individual letters spelling "Harbor Square", which is the name of this shopping mall. The letters are from 3 feet, to 4 feet 9 inches in height, and span a distance of 34 feet 9 inches in width. The roof sign replaced a property identification sign at the right of way which previously carried the name of the shopping center, but the space on the pole sign previously used to identify the mall was not eliminated. That space is now used to identify a uniform business in the mall. Petitioner is seeking these after the fact variances to authorize the roof sign which has already been erected, and to approve the height of an existing pole sign. An enforcement action initiated by the City is pending this variance determination. Tenants in the Harbor Square mall testified that the change in signage has made the mall more visible and accessible, and several of their customers have commented that their businesses are now easier to find. The tenants feel that this change in signage will benefit their businesses financially. The Development Code Adjustment Board has previously granted variances from the signage limitations imposed by the Code, but the evidence produced at hearing indicates that none of these variances were granted after the fact. The two variances which were approved for roof signs were based upon a finding of conditions unique to the property which created a hardship for the applicant. In both instances, the Board found that the applicant had not created his own hardship, but that it arose from the size or positioning of the property involved in each application. In this case, nothing unique about the property can be found. The applicant has caused his own problems by allowing a sign to be erected without first obtaining a permit or variance. The Petitioner urges that it was the responsibility of his sign contractor to obtain all necessary permits or variances, and that the contractor did not inform him that a variance was necessary before he erected the sign. However, neither the sign contractor nor the Petitioner himself was present to testify, and therefore, there can be no finding with regard to his credibility, or with regard to whatever arrangement he had with the contractor. In any event, as the property owner seeking a variance, Petitioner has failed to establish any basis for a finding of a hardship or circumstance unique to his property, other than the fact that he allowed this sign to be erected without obtaining the necessary approvals from the City.

# 8
JOHN TAYLOR, III vs. CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 86-002119 (1986)
Division of Administrative Hearings, Florida Number: 86-002119 Latest Update: Jan. 08, 1987

Findings Of Fact John Taylor, III, Petitioner, owns property located at 1200 South Missouri Avenue in the City of Clearwater which is zoned CC (commercial center). The subject property consists of a mall and movie theater. On or about April 17, 1986, Michael Johnson, on behalf of Petitioner, applied for a variance to allow two message signs on the subject property and also to allow total message signage of 256 square feet. Without a variance, the subject property can have only one message sign which cannot exceed 192 square feet. The property presently has one message sign and total message signage of 176 square feet located on its marquee. At a meeting of the Development Code Adjustment Board on May 8, 1986, Petitioner's variance application was denied. The parties stipulated that Fusco Corporation is the manager of the mall located on Petitioner's property and further that Fusco is the owner of all improvements on the property. Further, Cineplex-Odeon has leased the theater located on the subject property and has renovated and expanded it from two to five movie theaters. Finally, Michael Johnson was employed by Cineplex-Odeon to install the changeable message sign which is the subject of this variance. The second message sign which is sought by this variance would be located 350 feet from Missouri Avenue, which runs north and south in front of the subject property. Specifically, it will be located in the front wall of the theaters next to the ticket counter, and will be 16 feet long by 4.4 feet high. The sign would actually be a display case, 6 inches deep, with five individual poster display cases, which would be used to display coming attraction posters. Each display case would have a hinged glass door, through which the poster could be seen. Coming attraction posters are 2 feet long by 3.3 feet high. The 6 inch depth of the display case extends equally into, and protrudes out of, the front wall of the theater. Petitioner has not established that a hardship would exist if this variance is not approved. Coming attraction posters can be, and in fact are, displayed in the theater lobby. During the renovation of the theater, the front wall could have been removed and a window installed to allow viewing of the lobby posters from outside the theater. Finally, the existing sign on the property could be used to advertise coming attractions, as well as movies which are currently playing. The display case for which this variance is sought on behalf of Petitioner is a "changeable message sign," as that term is used in Section 134.011(a), Land Development Code, since it would be a graphic communication or device which would be primarily used to convey information or advertise and would also be prominently visible from outside the theater.

Florida Laws (1) 120.65
# 9
OSCEOLA FISH FARMERS ASSOCIATION, INC. vs SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 01-002900RP (2001)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jul. 20, 2001 Number: 01-002900RP Latest Update: Mar. 20, 2003

The Issue The issues are whether the proposed amendment to Rule 40E- 2.041(1), Florida Administrative Code, exceeds the agency's grant of rulemaking authority; enlarges, modifies, or contravenes the specific law implemented; or is vague, fails to establish adequate standards for agency discretion, and vests unbridled discretion in the agency.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Petitioner, Osceola Fish Farmers Association, Inc. (OFFA), is a non-profit corporation whose members consist of tropical fish farmers in Osceola County, Florida. The parties have stipulated that OFFA has standing to bring this action. Respondent, South Florida Water Management District (District or Respondent), is a public corporation operating pursuant to Chapter 373, Florida Statutes, with its principal office in West Palm Beach, Florida. Among other things, the District has the authority to regulate the uses of water within its geographic boundaries, including Osceola County. On an undisclosed date, the District began test drawdowns (a lowering of the elevation of the water through control structures) in the Alligator Chain of Lakes just east of St. Cloud in Osceola County, where OFFA's members are engaged in tropical fish farming. The drawdowns were undertaken for the purpose of allowing the Florida Fish and Wildlife Conservation Commission (FFWCC) to conduct demucking activities in the lakes to enhance aquatic habitat. Prior to beginning work, the FFWCC obtained an Environmental Resource Permit from the Department of Environmental Protection (DEP). However, the District did not require either itself or the FFWCC to obtain a consumptive use permit on the theory that a lake drawdown for demucking activities was not a consumptive use and therefore did not require a permit. In an effort to halt future scheduled drawdowns, OFFA participated in a United States Army Corps of Engineers proceeding which culminated in the preparation of an Economic Impact Statement for FFWCC's drawdowns; filed a complaint with DEP under Section 373.219(2), Florida Statutes, alleging that an unlawful consumptive use (without a permit) was taking place (which complaint was found to be insufficient); filed an action for injunctive relief in circuit court under Section 403.412, Florida Statutes (which was dismissed or dropped for undisclosed reasons); and finally initiated a proceeding against the District under Section 120.56(4), Florida Statutes, alleging that the District had adopted "an incipient non-rule policy of exempting lake 'drawdowns' from water use permitting requirements" (DOAH Case No. 00-3615RU). To avoid the consequences of an adverse ruling in the latter action, the District began rulemaking proceedings to adopt an amendment to Rule 40E-2.041(1), Florida Administrative Code, to codify its policy relative to lake drawdowns. As amended, the rule reads as follows: Unless expressly exempt by law or District rule, a water use permit must be obtained from the District prior to any use or withdrawal of water. The drawdown of lakes for environmental, recreational, or flood control purposes is not regulated by Chapter 40E-2 or 40E-20, F.A.C. (Underscored language represents amended language). Petitioner has challenged only the amendment, and not the existing rule. The effect of the rule is obvious - a lake drawdown for one of the three stated purposes in the rule will not require a permit, while all other lake drawdowns will. As specific authority for the proposed amendment, the District cites Sections 373.044 and 373.113, Florida Statutes. The former statute authorizes the District to "adopt rules pursuant to [Chapter 120] to implement the provisions of this chapter," while the latter statute authorizes it to "adopt rules pursuant to [Chapter 120] to implement the provisions of law conferring powers or duties upon it." The District has cited Sections 373.103(1), 373.219, and 373.244, Florida Statutes, as the specific laws being implemented. The first statute provides that if specifically authorized by DEP, the District has the authority to "administer and enforce all provisions of this chapter, including the permit systems established in parts II, III, and IV of [Chapter 373], consistent with the water implementation rule"; the second statute provides in relevant part that the District may "require such permits for consumptive use of water and may impose such reasonable conditions as are necessary to assure that such use is consistent with the overall objectives of the district or department and is not harmful to the water resources of the area"; and the third statute provides for the issuance of temporary permits while a permit application is pending. In regulating the uses of water within its boundaries, the District administers a comprehensive consumptive water use permit program under Part II, Chapter 373, Florida Statutes. Both parties agree that under Section 373.219(1), Florida Statutes (2000), all "consumptive uses" of water require a permit, except for the "domestic consumption of water by individual users," which use is specifically exempted by the same statute. The global requirement for permits is also found in Rule 40E-2.041 (the rule being amended), as well as Rule 40E- 1.602(1), which provides in relevant part that unless expressly exempted by statute or rule, "[a] water use individual or general permit pursuant to Chapters 40E-2 or 40E-20, F.A.C., must be obtained prior to use or withdrawal of water " The term "consumptive uses" is not defined by statute, but the District has promulgated a rule defining that term. By Rule 40E-2.091, Florida Administrative Code, the District has adopted by reference a document known as the "Basis for Review for Water Use Permit Applications with the South Florida Water Management District." Section 1.8 of that document contains definitions of various terms used in the permitting program, including "consumptive use," which is defined as "[a]ny use of water which reduces the supply from which it is withdrawn or diverted." The District's policy for lake drawdowns, as proposed in the rule amendment, is inconsistent with this definition. On this disputed issue, Petitioner's evidence is accepted as being the most persuasive, and it is found that a lake drawdown for any purpose is a consumptive use of water. Section 373.219(1), cited as a specific law being implemented, provides that the District "may require such permits for consumptive use of water and may impose such reasonable conditions as are necessary to assure such use is consistent with the overall objectives of the district and department and is not harmful to the water resources of the area." The District construes this language as authorizing it to decide which uses of water are a "consumptive use," and which are not, and to implement a rule which codifies those decisions relative to lake drawdowns. Not surprisingly, Petitioner views the statute in a different manner and argues that the statute simply allows the District to create a permit program that is consistent with Chapter 373; that under the law a permit is required for all consumptive uses, including lake drawdowns; and that the District has no authority to carve out an exception for a lake drawdown from the permitting process, no matter what the purpose. As noted above, the District has identified three instances (for environmental, recreational, and flood control purposes) when a lake drawdown does not require a consumptive use permit. These terms are not so vague that a person of common intelligence would have difficulty understanding them. However, the proposed rule contains no prescribed standards to guide the District in its administration of the rule.

Florida Laws (12) 120.52120.536120.56120.682.04373.044373.103373.113373.219373.223373.244403.412
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer