GREENSPACE PRESERVATION ASSOCIATION, INC.; FRANK WARD; SAL LOCASCIO; FREDERICK P. PETERKIN; AND HAROLD M. STAHMER vs ST. JOHNS RIVER WATER MANAGEMENT DISTRICT AND CITY OF GAINESVILLE, 97-002845 (1997)
Division of Administrative Hearings, Florida Filed:Gainesville, Florida Jun. 13, 1997 Number: 97-002845 Latest Update: Jul. 12, 2004

The Issue The issue is whether the City's applications for an individual stormwater permit and a noticed general environmental resource permit for Phase 1A of the proposed Hogtown Creek Greenway should be approved.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In these two cases, Respondent, City of Gainesville (City), seeks the issuance of a stormwater system management permit (stormwater permit) to construct a 2,000-foot long asphaltic trail/boardwalk, a parking facility and associated improvements for Phase 1A of the Hogtown Creek Greenway project in the north central portion of the City. That matter is docketed as Case No. 97-2845. The City also seeks the issuance of a noticed general environmental resource permit (NGP) to construct 481 square feet of piling supported structures over wetlands or surface waters for the same project. That matter has been assigned Case No. 97-2846. Respondent, St. Johns River Water Management District (District), is the regulatory agency charged with the responsibility of reviewing and approving the requested permits. Petitioner, Greenspace Preservation Association, Inc., is a not-for-profit Florida corporation primarily composed of persons who own real property adjacent to the route proposed by the City, as well as local environmental interests. Petitioners, Frank Ward, Sal Locascio, Frederick P. Peterkin, and Harold M. Stahmer, are individuals who own real property adjacent to the route proposed by the City for the Greenway. The parties have stipulated that Petitioners are substantially affected by the District's proposed action and thus have standing to initiate these cases. On March 28, 1997, the City filed applications for a stormwater permit and a NPG for Phase IA of the Hogtown Creek Greenway project. After conducting a review of the applications, including an on-site visit to the area, in May 1997, the District proposed to issue the requested permits. On June 9, 1997, Petitioners timely filed a Petition for Initiation of Formal Proceedings as to both intended actions. As amended and then refined by stipulation, Petitioners generally allege that, as to the stormwater permit, the City has failed to provide reasonable assurance that the project meets the permitting requirements of the District; the City has failed to provide reasonable assurance that the stormwater system will not cause violations of state water quality standards; the City has failed to provide reasonable asurance that the project satisfies the District's minimum required design features; and the City has failed to provide reasonable assurance that the stormwater system is capable of being effectively operated and maintained by the City. As to the NPG, Petitioners generally allege that the piling supported structure is not less than 1,000 square feet; the jurisdictional wetlands are greater than the area shown on the plans submitted by the City; the City has failed to provide reasonable assurance that the system will not significantly impede navigation; the City has failed to provide reasonable assurance that the system does not violate state water quality standards; the City has failed to provide reasonable assurance that the system does not impede the conveyance of a watercourse in a manner that would affect off-site flooding; the City has failed to provide reasonable assurance that the system will not cause drainage of wetlands; and the City failed to provide reasonable assurance that the system does not adversely impact aquatic or wetland dependent listed species. Respondents deny each of the allegations and aver that all requirements for issuance of the permits have been met. In addition, the City has requested attorney's fees and costs under Section 120.595(1)(b), Florida Statutes (Supp. 1996), on the theory that these actions were filed for an improper purpose. A General Description of the Project The Hogtown Creek Greenway is a long-term project that will eventually run from Northwest 39th Street southward some seven miles to the Kanapaha Lake/Haile Sink in southwest Gainesville. These cases involve only Phase 1A of that project, which extends approximately one-half mile. This phase consists of the construction of a 2,000-foot long asphaltic concrete trail/boardwalk, a timber bridge and boardwalk, a parking facility, and associated improvements. The trail will extend from the Loblolly Environmental Facility located at Northwest 34th Street and Northwest 5th Avenue, to the intersection of Northwest 8th Avenue and Northwest 31st Drive. The trail will have a typical width of ten feet. For the majority of its length, the trail will be constructed of asphaltic concrete overlying a limerock base, and it will generally lie at the existing grade and slope away from the creek. Besides the trail, additional work involves the repaving of Northwest 5th Avenue with the addition of a curb and gutter, the construction of an entrance driveway, paved and grassed parking areas, and sidewalks at the Loblolly Environmental Facility, and the widening and addition of a new turn lane and pedestrian crosswalk at the intersection of Northwest 8th Avenue and Northwest 31st Drive. The Stormwater Permit Generally The entire Phase IA project area lies within the Hogtown Creek 10-year floodplain. It also lies within the Hogtown Creek Hydrologic Basin, which basin includes approximately 21 square miles. The project area for the proposed stormwater permit is 4.42 acres. Water quality criteria Phase IA of the Greenway will not result in discharges into surface groundwater that cause or contribute to violations of state water quality standards. When a project meets the applicable design criteria under the District's stormwater rule, there is a presumption that the project will not cause a violation of state water quality standards. There are two dry retention basins associated with the project. Basin 1 is located at the cul-de-sac of Northwest 5th Avenue and will capture and retain the stormwater runoff from the new and reconstructed impervious areas at the Loblolly Facility. Basin 2 is located at the parking area and will capture and retain stormwater runoff at the existing building and proposed grass parking area. Under the stormwater rule, the presumptive criteria for retention basins require that the run-off percolate out of the basin bottom within 72 hours. The calculations performed by the City's engineer show that the two retention basins will recover within that timeframe. In making these calculations, the engineer used the appropriate percolation rate of ten inches per hour. Even using the worst case scenario with a safety factor of twenty and a percolation rate of one-half inch per hour, the two retention basins will still recover within 72 hours. The presumptive criteria for retention basins require that the basin store a volume equal to one inch of run-off over the drainage area or 1.25 inches of run-off over the impervious area plus one-half inch of run-off over the drainage area. The calculations performed by the City's engineer show that the two retention basins meet the District's volume requirements for retention systems. An applicant is not required to utilize the presumptive design criteria, but instead may use an alternative design if the applicant can show, based on calculations, tests, or other information, that the alternative design will not cause a violation of state water quality standards. As a general rule, the District applies its stormwater rule so that water quality treatment is not required for projects or portions of projects that do not increase pollutant loadings. This includes linear bicycle/pedestrian trails. The City's proposed trail will not be a source of pollutants. The City will install signs at both entrances to the trail to keep out motorized vehicles. Except for emergency and maintenance vehicles, motorized vehicles will not be permitted on the trail. The infrequent use by emergency or maintenance vehicles will not be sufficient to create water quality concerns. The construction of a treatment system to treat the stormwater from the trail would provide little benefit and would only serve to unnecessarily impact natural areas. Although treatment of the stormwater run-off from the trail portion of the project is not required under District rules, the run-off will receive treatment in the vegetated upland buffer adjacent to the trail. The District's proposed other condition number 3 will require the City to plant vegetation in unvegetated and disturbed areas in the buffer. This will reduce the likelihood of erosion or sedimentation problems in the area of the trail. Although disputed at hearing, it is found that the City's engineer used the appropriate Manning coefficient in the calculations regarding the buffer. Even without a vegetated buffer, run-off coming from the bicycle trail will not violate state water quality standards. The City will install appropriate erosion and sediment controls. These include siltation barriers along the entire length of both sides of the proposed trail prior to commencing construction. Such barriers will not allow silt or other material to flow through, over, or under them. The City will also place hay bales and any other silt fencing necessary to solve any erosion problem that may occur during construction. In addition, the permit will require an inspection and any necessary repairs to the siltation barriers at the end of each day of construction. Saturation of the limerock bed under the paved portion of the trail is not expected to cause a problem because heavy vehicles will not regularly use the trail. The trail portion of the project can be adequately maintained to avoid deterioration. Sensitive Karst Areas Basin criteria The two proposed dry retention basins for Phase 1A are located within the District's Sensitive Karst Areas Basin. They include all of the minimum design features required by the District to assure adequate treatment of the stormwater before it enters the Floridan aquifer and to preclude the formation of solution pipe sinkholes in the stormwater system. There will be a minimum of three feet of unconsolidated soil material between the surface of the limestone bedrock and the bottom and sides of the two retention basins. The appropriate mechanism for determining the depth of limestone is to do soil borings. The soil borings performed by the City show that there is at least three feet of unconsolidated material between the bottom of the basins and any limerock where the borings were taken. In other words, limestone would not be expected to be within three feet of the bottom of either basin. Based on the soil boring results, the seasonal high water table is at least six feet below ground level. The depth of the two retention basins will be less than ten feet. Indeed, the depth of the basins will be as shallow as possible and will have a horizontal bottom with no deep spots. To make the retention basins any larger would require clearing more land. A large shallow basin with a horizontal bottom results in a lower hydraulic head and therefore is less potential for a sinkhole to form. Before entering the basins, stormwater will sheet flow across pavement and into a grass swale, thereby providing some dispersion of the volume. Finally, the two retention basin side slopes will be vegetated. Special condition number 7 provides that if limestone is encountered during excavation of a basin, the City must over- excavate the basin and backfill with three feet of unconsolidated material below the bottom of the basin. Drainage and flood protection Contrary to Petitioners' assertions, the project will not adversely affect drainage or flood protection on surrounding properties. The trail will be constructed generally at existing grade. Because the trail will be constructed at existing grade, the net volume of fill necessary for Phase 1A is approximately zero. Therefore, there will not be a measurable increase in the amount of runoff leaving the site after construction, and the trail will not result in an increase in off-site discharges. District rules require that the proposed post- development peak rate of discharge from a site not exceed the pre-development peak rate of discharge for the mean annual storm only for projects that exceed fifty percent impervious surface. The proposed project has less than fifty percent impervious surface. Even though it is not required, the City has demonstrated that the post-development rate of discharge will not exceed the pre-development peak rate of discharge. Both basins will retain the entire mean annual storm so that the post-development rate of discharge is zero. Even during a 100-year storm event, the retention basins willl not discharge. Therefore, there will not be any increase in floodplain elevations during the 10, 25, or 100-year storm events from the proposed project. Operation and maintenance entity requirements The applicable requirements of Chapter 40C-42, Florida Administrative Code, regarding operation and maintenance, have been met by the applicant. The City proposes itself as the permanent operation and maintenance entity for the project. This is permissible under District regulations. The duration for the operation and maintenance phase of the permit is perpetual. The City has adequate resources and staff to maintain the phase 1A portion of the project. The public works department will maintain the stormwater management system out of the City's utility fund. The City provides periodic inspections of all of its stormwater systems. These inspections are paid for out of the collected stormwater fees. The City will also conduct periodic inspections of the project area, and the two retention basins will be easily accessed by maintenance vehicles. The City will be required to submit an as-built certification, signed and sealed by a professional engineer, once the project is constructed. Monthly inspections of the system must be conducted looking for any sinkholes or solution cavities that may be forming in the basins. If any are observed, the City is required to notify the District and repair the cavity or sinkhole. Once the system is constructed, the City will be required to submit an inspection report biannually notifying the District that the system is operating and functioning in accordance with the permitted design. If the system is not functioning properly, the applicant must remediate the system. The City will be required to maintain the two retention basins by mowing the side slopes, repairing any erosion on the side slopes, and removing sediment that accumulates in the basins. Mowing will be done at least six times per year. The City will stabilize the slopes and bottom areas of the basins to prevent erosion. The City has a regular maintenance schedule for stormwater facilities. The project will be included within the City's regular maintenance program. The City has budgeted approximately $80,000.00 for maintenance of the trail and vegetated buffer. Also, it has added new positions in its budget that will be used to maintain and manage the Greenway system. Finally, City staff will conduct daily inspections of the Phase 1A trail looking for problems with the vegetated buffer, erosion problems along the trail, and sediment and debris in the retention basin. If the inspections reveal any problems, the staff will take immediate action to correct them. The Noticed General Environmental Resource Permit Generally By this application, the City seeks to construct 481 square feet of piling supported structures over wetlands or surface waters. The proposed structures include a 265 square foot timber bridge over an un-vegetated flow channel, which connects a borrow area to Possum Creek, and a 216 square foot boardwalk over two small wetland areas located south of the flow channel. None of the pilings for the bridge or boardwalk will be in wetlands, and no construction will take place in Hogtown or Possum Creeks. The paved portion of the trail will not go through wetlands, and there will be no dredging or filling in wetlands. The receiving waters for the project are Hogtown and Possum Creeks. Both are Class III waters. Hogtown Creek originates in north central Gainesville and flows southwest to Kanapaha Lake/Haile Sink in southwest Gainesville. Possum Creek originates in northwest Gainesville and flows southeast to its confluence with Hogtown Creek south of the proposed bridge structure. Wetlands The total area of the proposed bridge and boardwalk over surface water or wetlands is approximately 481 square feet. The wetland delineation shown on the City's Exhibit 5A includes all of the areas in the project area considered to be wetlands under the state wetland delineation methodology. The United State Army Corps of Engineers' wetland line includes more wetlands than the District wetland line. The former wetland line was used to determine the area of boardwalk and bridge over wetlands. Even using this line, however, the total area of boardwalk over surface waters or wetlands is approximately 481 square feet and is therefore less than 1,000 square feet. Navigation The proposed system does not significantly impede navigation. Further, the structures will span a wetland area and an un-vegetated flow channel, both of which are non-navigable. In fact, the flow channel generally exhibits little or no flow except after periods of rainfall. Water quality The construction material that will be used for the bridge and boardwalk will not generate any pollutants. Morever, chemical cleaners will not be used on those structures. Silt fences will be used and vegetation will be planted in the vicinity of the bridge and boardwalk to prevent erosion and sedimentation problems. The amount of erosion from drip that comes off the boardwalk will be minimal. Therefore, the bridge and boardwalk will not cause a violation of state water quality standards. Off-site flooding The project will not impede conveyance of any stream, river, or other water course which would increase off-site flooding. The structures will completely span the wetland areas and flow channel, and no part of the structures, including the pilings, will lie within any water or wetland areas including the flow channel. There will be a span of 2.5 to 3 feet from the horizontal members of the bridge and boardwalk down to the ground surface which will allow water to pass through unobstructed. Further, there will not be any cross ties or horizontal obstructions on the lower portions of the boardwalk or bridge pilings. Further, due to the spacing of the pilings, the boardwalk and bridge will not trap sufficient sediment such as leaves to impede the conveyance of the flow channel. Therefore, conveyance through the flow channel will not be affected by the structures. Because the boardwalk and bridge are not over Hogtown or Possum Creeks, they will not cause any obstruction to the conveyance of the creeks. Aquatic and wetland dependent listed species The project will not adversely affect any aquatic or wetland dependent listed species. These species are defined by District rule as aquatic or wetland dependent species listed in Chapter 39-27, Florida Administrative Code, or 50 Code of Federal Regulations, Part 17. No such species are known to exist in the project area, and none are expected to exist in the location and habitat type of the project area. Therefore, contrary to Petitioners' assertions, there are no listed salamander, frog, turtle, or lizard species known to occur within the Hogtown Creek basin. Although it is possible that the box turtle may be found in the project area, it is not an aquatic or wetland dependent listed species. One baby American alligator (between two and three feet in length) was observed in the borrow pit area of the project on September 11, 1997. Except for this sighting, no other listed animal species have been observed in the project area. As to the alligator, the only area in which it could nest would be in the existing excavated borrow pit, and none of the proposed construction will take place in that area. More than likely, the alligator had walked into the area from Clear Lake, Kanapaha Prairie, or Lake Alice. The proposed structures will not affect the movement of the alligator nor its feeding habits. Drainage of wetlands Because the boardwalk and bridge are elevated structures over waters and wetlands, and the City has not proposed to construct ditches or other drainage systems, the proposed system will not cause drainage of the wetlands. Coral/macro-marine algae/grassbeds The proposed system is not located in, on, or over coral communities, macro/marine algae, or a submerged grassbed community. D. Were the Petitions Filed for an Improper Purpose? Prior to the filing of their petitions, Petitioners did not consult with experts, and they prepared no scientific investigations. Their experts were not retained until just prior to hearing. Petitioners are citizens who have genuine concerns with the project. They are mainly longtime residents of the area who fear that the Greenway will not be properly maintained by the City; it will increase flooding in the area; it will cause water quality violations; and it will attract thousands of persons who will have unimpeded access to the back yards of nearby residents. Although these concerns were either not substantiated at hearing or are irrelevant to District permitting criteria, they were nonetheless filed in good faith and not for an improper purpose.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order approving the applications of the City of Gainesville and issuing the requested permits. DONE AND ENTERED this 19th day of December, 1997, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 19th day of December, 1997. COPIES FURNISHED: Henry Dean, Executive Director St. Johns River Water Management District Post Office Box 1429 Palatka, Florida 32178-1429 Samuel A. Mutch, Esquire 2790 Northwest 43rd Street Suite 100, Meridien Centre Gainesville, Florida 32606 Jennifer B. Springfield, Esquire Mary Jane Angelo, Esquire Post Office Box 1429 Palatka, Florida 32178-1429 Richard R. Whiddon, Jr., Esquire Post Office Box 1110 Gainesville, Florida 32602-1110

Florida Laws (3) 120.57120.59517.12 Florida Administrative Code (6) 40C-4.02140C-400.47540C-41.06340C-42.02340C-42.02740C-42.029
# 1
DELMAR WATER CORPORATION vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 76-001008 (1976)
Division of Administrative Hearings, Florida Number: 76-001008 Latest Update: Jun. 15, 1977

Findings Of Fact This application is a request for a consumptive water use permit for six wells at the following locations: LATITUDE LONGITUDE 28 degrees 20' 50" 82 degrees 41' 36" (hereinafter referred to as Garden Terrace No.1) 28 degrees 20' 50" 82 degrees 41' 35" (hereinafter referred to as Garden Terrace No.2) 28 degrees 20' 55" 82 degrees 39' 11" (hereinafter referred to as Parkwood Acres No.1) 28 degrees 21' 20" 82 degrees 39' 11" (hereinafter referred to as Parkwood Acres No.2) 28 degrees 21' 49" 82 degrees 38' 56" (hereinafter referred to as New Well No.1) 28 degrees 21' 50" 82 degrees 38' 56" (hereinafter referred to as New Well No.2) Although included in the application, it appears from the record of this proceeding that Garden Terrace No. 1 is to be abandoned by applicant upon completion of its new facilities and therefore is not intended for inclusion in any consumptive water use permit issued pursuant hereto. Further, it appears from the records that the applicant intends to use Garden Terrace No. 2 as an emergency standby supply well only and therefore its average daily withdrawal as reflected on the application is not intended to be included in a consumptive water use permit issued pursuant hereto. Therefore, with those amendments the application seeks, from a total of five wells, a maximum daily withdrawal of 1,501,000 gallons and an average daily withdrawal of 650,000 gallons. The use of this water is for public water supply and appears to be a reasonable, beneficial use consistent with the public interest and not interfering with any legal use of water existing at the time of the application. Further, according to testimony of the staff of the Southwest Florida Water Management District it does not appear that any of the matters set forth in Subsection 16J-2.11(2), (3) or (4), F.S., exist so as to require the denial of this permit. The staff recommendation is that this permit be granted for a maximum daily withdrawal of 1.50 million gallons per day and an average daily withdrawal of .650 million gallons per day. The staff recommendations are subject to the following conditions: That all individual connections to the system be metered. That the permittee shall install totalizing flow meters of the propeller driven type on all withdrawal points covered by this permit with the exception of those wells which are currently gaged together using a single meter. That the permittee shall submit to the District a record of his pumpage for each meter. Said pumpage shall be read on a monthly basis and submitted quarterly to the District by April 15, July 15, October 15, and January 15, for each preceding calendar quarter. That the permittee have water samples from all wells permitted analyzed for chloride on a monthly basis and results submitted to the District by April 15, July 15, October 15 and January 15 for each preceding calendar quarter. That to promote good water management and avoid salt water intrusion that the water be withdrawn at an average of .217 million gallons per day from each of the three following wells: Parkwood Acres Well No. 1, Parkwood Acres Well No. 2, and New Well No. 1. New Well No. 2 shall be operated only to meet peak demand. That Garden Terrace Well No. 2 be used only as an emergency standby well. The applicant entered no objections to the conditions set forth above nor were there any objections from members of the public to the issuance of this consumptive water use permit.

Recommendation It is hereby RECOMMENDED that a consumptive use permit be issued for the five subject wells for the withdrawal of 1.30 mgd maximum daily withdrawal and .65 mgd, average daily withdrawal subject to the conditions set forth in paragraph 4 above. DONE and ORDERED this 15th day of July, 1976, in Tallahassee, Florida. CHRIS H. BENTLEY, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Jay T. Ahern, Esquire Southwest Florida Water Management District P.O. Box 457 Brooksville, Florida 33512 Delmar Water Corporation 731 West Main Street New Port Richey, Florida 33552

# 2
THE CEPCOT CORPORATION AND CLEARWATER TRAIN STATION, INC. vs CITY OF CLEARWATER PLANNING DEPARTMENT, 03-002585 (2003)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Jul. 16, 2003 Number: 03-002585 Latest Update: Feb. 16, 2005

The Issue The issue on appeal is whether, pursuant to Clearwater Code of Ordinances Section 4-505, to sustain or reverse, with or without conditions, the decision of the Community Development Board on June 20, 2003, denying Cepcot Corporation's application to build a convenience store with two islands for pumping gas.

Findings Of Fact Petitioner The Cepcot Corporation (Cepcot) owns real property located at 657 Court Street in the downtown zoning district of the City of Clearwater (Property). On December 17, 2002, Cepcot filed a Flexible Development Application for a comprehensive infill redevelopment project (Application) on the Property. At the time of the proposal, the Property, which comprises 0.95 acres, was developed with a restaurant in a building that was the former Clearwater train station, a thrift store, and a park. The Application proposes the demolition of these improvements and their replacement with a 3200 square-foot convenience store and two gas pump islands. The Property fronts Chestnut Street to the south, East Avenue to the east, and Court Street to the north. The surrounding area is developed with office uses to the west and south, a privately owned utility plant to the north, and warehouse uses to the east. Upon the completion of the Memorial Causeway bridge, which is presently under construction, traffic to the beach will use Court Street and traffic from the beach will use Chestnut Street. In response to questions and suggestions from Respondent's staff, Cepcot revised the proposed site plan several times. The Application is presently complete. Respondent's Planning Department prepared a Staff Report, which finds that the proposed project does not meet certain requirements and recommends denial of the Application on several grounds. On June 17, 2003, Respondent's Community Development Board (CDB) considered the Application. CDB denied the Application and issued a development order explaining the reasons for denial as follows: The proposal is inconsistent with the adopted Community Development Code, the Comprehensive Plan, 1995 Clearwater Downtown Redevelopment Plan, and the Downtown Design Guidelines. The proposed automobile service station is not a permitted use within the downtown district. Approval of the proposed use may encourage other like uses and may be detrimental to downtown redevelopment. The proposal does not comply with the Flexible Development criteria as a comprehensive infill redevelopment project per Section 2-803. The proposal is not in compliance with the other standards in the Code including the general applicability criteria for Section 3-913. Most of the reasons cited for denial involve Respondent's Community Development Code (CDC), which is the land development regulations. The Property is in the Downtown District. CDC Section 2-901 states: "The intent and purpose of the Downtown District is to establish a mixed use downtown where citizens can work, live, and shop in a place which is the economic, governmental, entertainment and cultural focal point of a liveable city." CDC Section 2-902 sets forth the permitted uses within the Downtown District, and CDC Chart 2-100 lists permitted uses by zoning district. The proposed uses are not among the permitted uses for the Downtown District (or the Tourist District, to which portions of the record refer). CDC Section 2-903.C sets forth the following ten criteria to be applied in determining if the proposed use qualifies as a Comprehensive Infill Redevelopment Project (CIRP) that may qualify an otherwise non-permitted use: The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards; The development of the parcel proposed for development as a Comprehensive Infill Redevelopment Project will not reduce the fair market value of abutting properties; The uses within the comprehensive infill redevelopment project are otherwise permitted in the City of Clearwater; The uses or mix of uses within the comprehensive infill redevelopment project are compatible with adjacent land uses; Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater; The development of the parcel proposed for development as an comprehensive infill redevelopment project will upgrade the immediate vicinity of the parcel proposed for development; The design of the proposed comprehensive infill redevelopment project creates a form and function which enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole; Flexibility in regard to lot width, required setbacks, height and off-street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole; Adequate off-street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on-street parking in the immediate vicinity of the parcel proposed for development; The design of all buildings complies with the Downtown District design guidelines in Division 5 of Article 3. CDC Section 3-913.A sets forth the General Applicability criteria. CDC Section 3-913.A.1 states: "The proposed development of the land will be in harmony with the scale, bulk, coverage, density, and character of adjacent properties in which it is located." CDC Section 3-913.A.5 states: The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development."

Florida Laws (1) 120.569
# 3
ALAN R. BEHRENS vs CONSOLIDATED MINERALS, INC., AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 92-000953 (1992)
Division of Administrative Hearings, Florida Filed:Arcadia, Florida Feb. 12, 1992 Number: 92-000953 Latest Update: Dec. 07, 1994

Findings Of Fact THE PARTIES CMI is a Florida corporation authorized to do business in Florida. CMI owns a mine site as is depicted in the permit application, which mine site is known as "Pine Level". Alan R. Behrens owns residential property approximately two miles from Pine Level, which abuts Horse Creek. He maintains an individual well for domestic and other purposes, and is a substantially affected person under the statute. Charlotte County is a government entity and a political subdivision of the State of Florida, and is a substantially affected person under the statute. The City of North Port is an incorporated municipality of the State of Florida, and is a substantially affected person under the statute. The Environmental Confederation (ECOSWF), a citizens group, is a substantially affected person under the statute. The District is the agency with the responsibility for reviewing and ruling upon CMI's water use permit application. APPLICATION AND PROCESS CMI proposes to operate a phosphate mine facility at "Pine Level" ("site"). The site is located approximately seven miles west of Arcadia, DeSoto County, Florida. The mine reserves at the site are approximately 17,700 acres. 9,000 to 10,000 acres are projected for mining. In 1978, Consumptive Use Permit No. 200103, was issued and in 1986, the current owners purchased the corporation which held the permit, and changed the name of the corporation to CMI. The Industrial Water Use Permit has not been used since it was issued to a prior owner of the site, and provided for average daily withdrawals of 13.6 mgd from wells. In 1984, this permit was renewed and modified to provide for average daily withdrawals of 12.8 mgd from deep wells. The groundwater withdrawals currently sought by CMI is 6.9 million gallons per day ("mgd") average daily withdrawal, which totals include 5.1 mgd from deep wells for use in the amine flotation process and 1.7 mgd for sealing the matrix slurry pumps. This reduction to 6.9 mgd in permitted withdrawals is a significant reduction. In addition, the proposed permit allows 3.7 mgd to be withdrawn from the surficial aquifer by dewatering mine cuts. In November, 1990, CMI submitted an application for renewal. In November 1991, CMI submitted to the District a revised Water Use Application No. 200103.02 ("application") to renew and modify the existing water use permit. The District requested more information, and CMI provided additional information and supplemental responses to aid in the review and evaluation of the application. The District prepared and submitted a Notice of Intent to Issue Permit and the District staff has prepared a "draft" Permit No. 200103.02 authorizing the withdrawal of the quantities requested in the application with certain conditions. In addition to renewal and modification of the water use permit, which is the subject of this proceeding, CMI will be required to participate in numerous regulatory reviews and permitting procedures (i.e. a development of regional impact evaluation, a federal environmental impact statement, federal approvals under the Clean Water Act [including a national pollutant discharge elimination system ("NPDES") permit], and a conceptual reclamation plan review) before CMI may commence mining, and consequently, begin any withdrawal of water. The mining process will utilize large walking draglines to excavate over burden and stack it beside the active mining area for land reclamation. The ore material called "matrix" will be dug up by the draglines, placed into an earthen pit where it will be slurried with a high pressure water jet. A pump will pick up this slurried matrix material, pump it back to the processing plant where it will first go through various separation devices, including screens and cyclones. The course material termed "pebble" will be separated and parts of that will be directly saleable as a product. The bulk of the phosphate product is contained in intermediate-sized material called concentrate feed. The concentrate feed consists of ore and sand. The ore is separated from the sand in a process called "flotation". The flotation process is a two stage process that ends up separating the tailings sand, which can then go back to the sand-clay flocculation and mixing units, and be pumped out ultimately for land reclamation back in the mine-out areas. The phosphate product which is called "wet rock", is placed in storage bins where it can drain, and be loaded onto rail cars for shipment. The "amine flotation process" is the second stage of flotation where sand and phosphates are separated. This process requires clean water for the amine flotation phase, because any amount of contaminants, including organic reagents, will adversely affect the process. Any mineral particles must be removed so that the amine may attach itself to the phosphate. Any contaminants will destroy or significantly and adversely affect not only the phosphate recovery, but the entire flotation process. Deep well water is requested for use in the amine flotation process because it is clean. All phosphate mines in Florida currently rely on deep well water. 5.2 mgd is the minimum amount of "clean" water needed to assure efficient processing of the amine flotation process of the mine beneficiation plant. Deep well withdrawals are also commonly used for the purpose of sealing or protecting the packing of pumps at various points in the mine system in order to avoid damage to the equipment. These wells are often referred to as "sealing water wells". The Pine Level mine will require 1.7 mgd for this purpose. Water for the sealing water wells must be clean and clear in order to effectively seal pumps for leaks. The Pine Level project will provide 400-500 construction jobs during the construction period. It will provide approximately 200 full-time jobs with an annual payroll of about five million dollars once it is in operation. It will result in about one thousand additional jobs providing services to the development. It will pay in excess of one million dollars a year to DeSoto County in ad valorem taxes. TECHNICAL CRITERIA The water use is a reasonable and beneficial use. 5.2 mgd groundwater withdrawal is "necessary to fill a certain reasonable demand." The technical criteria relating to water level or rates of flow impacts set forth in Rule 40D-2.301(1)(d), Florida Administrative Code, are not applicable in this proceeding because the District has not established any regulatory levels or rates of flow for the area encompassed by the application. In addition, this presumption only addresses surface water withdrawals. Phosphate mining is a beneficial activity and is consistent with the public interest. There is no significant risk of salt water intrusion. The water use withdrawal will not degrade the water quality in the aquifer by causing any contamination plume to spread. There have been no contaminant plumes identified on site. GROUNDWATER IMPACTS There is sufficient ground water at the site of a suitable quality and quantity to support the proposed phosphate mining and beneficiation activities. The local hydrogeology at the site consists of an upper layer known as the surficial aquifer. Rain penetrates the surficial aquifer to flow vertically to the water table. The water that is not consumed by vegetation at this layer will flow either to a nearby stream channel or will leak down through a semi- confining layer. The water continues to seep vertically into the lower underlying limestone aquifers. There are three limestone water-bearing layers: the intermediate, the Suwannee or Upper Floridan, and the Avon Park or Lower Floridan aquifers, respectively. The intermediate and the underlying Suwannee aquifer are separated by another semi-confining layer. Likewise, the Avon Park aquifer and the Suwannee aquifer are separated by another semi-confining layer. At the site, wells in the intermediate aquifer will draw water to seal the bearings on the matrix slurry pumps. There will be one deep well in the Suwannee and one deep well in the Avon Park to draw for the beneficiation plant. The groundwater modeling performed by CMI simulated the four aquifers, that is, the surficial aquifer and each of the three limestone aquifers. An Aquifer Performance Test ("APT") was performed at the site. The data generated from the APT was used to calculate various aquifer parameters, for example, transmissivity, storage coefficient, and leakiness. This information was then used in setting up the groundwater flow model that ultimately was incorporated into the application. During the District staff's review of the application, the deep well withdrawal quantities requested by CMI were compared with approximately 6 other phosphate mines of comparable size, acreage, and type of operation. As a result of this comparison, the staff found CMI's requested use to be less than the other six phosphate mines. The use of recycled water in the amine flotation process in place of deep well water in the past by CMI has proven unsuccessful because a constant temperature and a constant ph level could not be maintained with recycled water, and recycled water contains traces of fatty acids and oils, which also negatively affect the amine flotation process. C.F. Industries, Inc., has been operating a phosphate mine in Hardee County, Florida, since 1978. C.F. Industries, Inc., has since 1983 at the Hardee County mine, successfully substituted recirculation water for deep well water for operation of the amine flotation circuit on a routine basis. C.F. Industries, Inc., presently plans to employ substitution of some recirculation water for deep well water in a new yet-to-be permitted mine. C.F. Industries, Inc., at its existing Hardee County mine requires use of deep well water for start-up purposes to "charge" the system. C.F. Industries, Inc., at its existing mine, uses deep well water to respond to abnormal operational conditions, including excessive rainfall events, when the quality of the normal recirculation water is not suitable for substitution of deep well water. Neither CMI, nor District staff was aware prior to hearing, that the C.F. mine was successfully substituting recycled water for deep well water in the amine flotation process. At the time of making the representations to the District about necessary water quality requirements of the flotation process, CMI had a study, entitled, Amine Water Evaluation, Pine Level Project, July 27, 1984, ("Pilot Plant Study"), which concluded that deep well pumping and discharge could be reduced by use of water drawn from mine cuts. The Pilot Plant study was site specific to CMI's proposed phosphate mine. The Pilot Plant study bench tests were verified in the same pilot plant facility CMI uses to verify the grade of ore on the Pine Level Site. The Pilot Plant study or its results were known to CMI officials or experts involved in the permit application at issue in this case. CMI did not inform District staff of the existence or conclusions of the Pilot Plant study. The Pilot Plant study indicates that CMI could reduce its water usage by substituting water from mine cuts for deep well water. CMI did no studies to determine if the substitution of mine cut water for deep well water, as suggested by the Pilot Plant Study, was feasible to implement. SURFACE WATER IMPACTS The phosphate ore (matrix), is extracted by an excavation machine called a "dragline", which opens mining cuts of approximately 32 to 35 feet in depth, 330 feet wide, and up to 4,000 feet long. Seepage occurs into the mine cuts from the water table, and must be pumped out in order to see and extract the matrix. This dewatering is also necessary to protect the draglines against slope stability problems. Water pumped out of the mining cuts is introduced into the mine water recirculation system which is operated for purposes of collecting and recycling water within the mine complex. The matrix that is extracted from the mining cut is placed in a shallow excavation near the cut, and is converted to a slurry and, thereafter, transported hydraulically to the mine processing (or "beneficiation") plant. The beneficiation plant uses considerable quantities of water, utilizing supplies from within the mine system (i.e. surface water) and water from deep wells. Sand tailings and sand and clay mixture are by-products of the mining process. Recycled water is used to transport waste clay and sand from the plant to the disposal and reclamation areas. Reclamation takes 1-2 years for areas reclaimed with sand tailings and 5-6 years for areas reclaimed with a sand-clay mixture. Groundwater that is used in the processing plant is recycled. Water within the mine is recycled a number of times, and CMI's proposal calls for 90 percent of the total mine demand to be satisfied by this recirculation system and approximately 96 percent of the water used is recyclable water. DEWATERING AND WATER BALANCE CMI's mine pit dewatering activities result in the withdrawal of water from the surficial aquifer. A "water balance" demonstrates that requested quantities relate to reasonable mining, processing, and dewatering needs. The "water balance" for the mining operation evidences a balance between sources and uses/losses. The sources of water in the CMI water balance that input to the mining operation include groundwater from wells (6.9 mgd), mine cut dewatering or water table drainage (3.7 mgd), and collected rainfall (3.1 mgd). Uses and losses associated with the mining operation include water retained in clays (6.7 mgd), water shipped with final product (.7 mgd), evapotranspiration and evaporation (3.0 mgd), water used for agricultural irrigation (5.0 mgd), and water seeping from the Mine Water Surge Area ("MWSA") (1.2 mgd). The water balance matrix moisture component of 2.9 mgd is not a withdrawal of water for water use permitting purposes. The District's modeling of the impacts resulting from mine cut dewatering resulted in a finding of 2.34 MGD as opposed to the 3.7 mgd derived by CMI. For calculation purposes, rainfall is collected at the rate of 3,974 gallons per acre per day. CMI calculates that it will collect 3.1 mgd of rainfall, and use it in its recirculation system. The 3.1 mgd calculation is based on the amount of rain that will fall on 600 acres of mine water surge area, 80 acres of plant site, and two 50 acre mine cuts. CMI plans to mine 450 acres each year at the Pine Level Site over a period of 22 years. Runoff over disturbed areas on the CMI mine site must be captured, and will become part of the recirculation system. Assuming only one year of disturbed area during the permit term, CMI has failed to account for nearly 1.8 mgd in its water balance (450 acres x 3,974 gallons/acre/day). CMI plans to pump any rainfall collected from all disturbed areas to the mine water surge area (MWSA). CMI has not included any acres of disturbed area in its calculations of the amount of rainfall it will collect for the current permit. CMI has not submitted a mine plan. Without a mine plan, the number of disturbed acres cannot be determined. Because CMI's water balance does not include rainfall collected over disturbed areas, the water balance is incorrect. The rainfall collected from the disturbed areas will increase the amount of water that CMI will need to discharge or use for agricultural purposes. Excavation of the Mine Water Surge Area will cause dewatering of the surficial aquifer. No analysis was done of how much dewatering of the surficial aquifer will occur as a result of the excavation of the MWSA, or of the potential impacts to wetlands as a result of the dewatering activities. The District's one foot draw down presumption applies to dewatering as well as to groundwater pumping. The proposed dewatering setback from wetlands was set at 660 feet. The 660 foot setback distance is in lieu of mitigation if CMI wishes to mine within the setback distance, it will be required to implement mitigation procedures. Dewatering draw downs in the surficial aquifer as great as six and one-half to seven feet could occur on the CMI site at 660 feet from a mine cut under dry weather conditions. At 660 feet, the predicted draw down is nearly one and one-half feet using a mine pit depth of 26 feet, based on a three foot water table and a 29 foot average mine cut depth for the area expected to be mined during the term of the permit. Actual mine cut depths during the term of the permit would be as deep as thirty-seven feet which result in a draw down in the aquifer that is greater than one and on-half feet. Combining the dewatering calculations with the surficial aquifer draw downs resulting from CMI's planned well pumping from the intermediate and Floridian aquifers result in greater than predicted draw downs. CMI's water balance did not account for changes in water needs due to variability of the ore body. WATER QUALITY CMI has not demonstrated that the water quantities requested for the operation of the phosphate mine and beneficiation plant, and land reclamation and water handling will utilize the lowest water quality to the greatest extent practicable. Nevertheless, the Pine Level mine is innovative in comparison to other operating mines. It proposes to reduce its groundwater requirement by increasing the amount of recycled water used in the amine flotation process; employ an innovative sand/clay mixing technique for land reclamation, thus eliminating the need for conventional large, above-ground day settling areas or slime ponds; and use surplus water for irrigation of agricultural crops or pasture. CMI plans to mine the Pine Level Site for a period of 22 years. For phosphate mines, neither DNR, nor SWFWMD analyze impacts with respect to surface water during the mining process. For phosphate mines, no state agency looks at off-site surface water impacts from the standpoint of draw downs, with the possible exception of cities and counties. The District has not required CMI to submit an application for the management and storage of surface waters permit, since the District staff believes that phosphate mines are exempt from obtaining any MSSW permit from the District. A gap exists in the regulatory scheme for phosphate mines with respect to the reduction of surface water flows during the mining process if SWFWMD exempts phosphate mines from obtaining an MSSW permit. INTERFERENCE WITH EXISTING LEGAL USERS The City of North Port is an existing legal user of water. The City of North Port has a public water supply facility which draws its water from the Big Slough. The Big Slough normally gets a portion of its flow from high quality water in the surficial aquifer. CMI's proposed Pine Level phosphate mine is located in the watersheds which feed the Big Slough and the Peace River. In the initial years of the mine, virtually all of the collected rainfall will be diverted from the Big Slough watershed. No analysis has been done to see how dewatering might affect the City of North Port. Any significant reduction in flow to the City of North Port's facility during the low flow season will interfere with North Ports existing legal use of water. Diversion of 3.1 mgd of rainfall from the Big Slough will have an adverse impact on the City of North Port's water facility. The City of North Port is currently under a consent agreement with the Florida Department of Environmental Regulation because the water supplied by its facility violates drinking water quality standards for sulfates and total dissolved solids ("TDS") regularly during periods of low flow in the Big Slough. The MWSA, the plant area and the initial mining areas are primarily within the Big Slough drainage area. Seepage of 1.2 mgd from the MWSA will flow into the Big Slough. The only analysis done of the quality of the seepage from the MWSA was a rough analysis which showed that sulfates will likely be around 550 grams per liter. The legal standard for sulfates in drinking water is 250 grams per liter. Seepage from the MWSA will be high in total dissolved solids ("TDS") since a good portion of it was pumped from deep wells which have very high levels of TDS. No analysis was done of the potential of this seepage water to interfere with North Port's facility. Charlotte County is an existing legal user of water whose water supply is drawn from the Peace River downstream from the proposed CMI phosphate mine at Pine Level. Discharge of 5.0 mgd from the Pine Level mine could adversely affect Charlotte County's drinking water facility located on the Peace River. AGRICULTURAL USE CMI proposes to use 5.0 MGD of surplus water for irrigation of pasture grasses for cattle. CMI has not conducted any specific tests to determine the feasibility of using the discharge or the quality of the water that they plan to use for agricultural irrigation. The water for irrigation will be drawn out of the mine water surge area. The determination of whether the 5.0 mgd discharge can be used for agricultural irrigation has been postponed. The staff's position is that the proposed special conditions provide reasonable assurances that the discharge will comply with the requirements of the Basis for Review. WETLANDS Isolated wetlands occur throughout the CMI mine site. The isolated wetlands on the CMI property provide habitat for endangered and threatened species. Sandhill Cranes and Wood Storks, both threatened or endangered species, were sighted on the CMI property by wetlands experts during their site visit prior to the hearing. Small isolated wetlands on CMI property would be adversely affected by less than a one foot draw down. Wetland peat soils oxidize if exposed to the air. Oxidation results in subsidence of the wetland soils, which adversely impacts wetlands. Too much water as well as too little water can adversely impact wetlands. The combined effects of aquifer pumping and dewatering planned at the CMI site will adversely affect wetlands. No analysis was completed of the impacts to wetlands as a result of the combined effects of dewatering and pumping from the aquifer. No information regarding the normal range of wetland hydroperiods for preserved wetlands or other onsite unmined wetlands was introduced. No information was provided regarding the habitat functions provided by the wetlands on the CMI site either for threatened or endangered species or otherwise. ENVIRONMENTAL IMPACT The Applicant did not provide reasonable assurance that the water use will not cause unacceptable adverse impacts to environmental features on or off- site. The Applicant did not provide reasonable assurances that the water use will not have an adverse impact to surface water bodies such as lakes, ponds, impoundments, springs, streams, canals, estuaries or other water courses. The Applicant did not provide reasonable assurances that there will be no adverse environmental impact to wetlands, lakes, streams, estuaries, fish, and wildlife or other natural resources. The Applicant did not provide reasonable assurances that there will be no adverse impacts to the surface water system or vegetation as a result of groundwater withdrawal. The Applicant did not provide reasonable assurances that the water use will not have an adverse impact by altering or impairing the habitat of threatened or endangered species. The Applicant did not provide reasonable assurances that the projected draw downs will not result in any adverse impact to any protected or non-protected plant or animal species. The Applicant did not provide reasonable assurances that the water use will not have an adverse environmental impact to wetlands.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Governing Board of Southwest Florida Water Management District enter a Final Order DENYING the issuance of a Water Use Permit to the Applicant, CMI. DONE and ENTERED this 20th day of April, 1993, in Tallahassee, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of April, 1993. APPENDIX The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on proposed findings of fact submitted by the parties. Proposed findings of fact submitted by Petitioner. Accepted in substance: paragraphs - 13, 14, 15, 21, 24, 31, 35, 38, 70, 71, 73, 75, 91, 97, 100, 104, 105, 114, 115, 116, 125, 126, 127, 128, and 129. Rejected as subsumed or irrelevant and immaterial: paragraphs - 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 16, 17, 19, 20, 22, 23, 25, 27, 28, 29, 30, 33, 34, 36, 37, 37A, 39 40, 43, 44, 45, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 72, 74, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86,87, 92, 93, 94, 95, 96, 98, 99, 101, 102, 103, 106A, 106, 107, 108, 109, 110, 111, 112, 113, 117, 120, 121, 122, 123, 124, 130, 131, 132, 133, and 134. Rejected as against the greater weight of the evidence: paragraphs - 18, 26, 32, 41, 42, 46 (omitted), 47 (omitted), 69, 88 (omitted), 89 (omitted), 90 (omitted), 118 (omitted), 119 (omitted), and 135 (omitted). Proposed findings of fact submitted by Petitioner, Charlotte County. Accepted in substance: paragraphs - 1, 2, 7, 18, 19, 20, 22, 25, 28, 29, 36, 40, 41, 51, 59, and 62. Rejected as argument, subsumed or irrelevant and immaterial: paragraphs - 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 21, 23, 24, 26, 27, 30, 31, 32, 33, 34, 35, 37, 38, 39, 42, 45, 46, 47, 48, 49, 50, 52, 53, 54, 55, 56, 57, 58, 60, and 61. Rejected as hearsay: paragraphs - 43 and 44. Proposed findings of fact submitted by Petitioner, City of North Port. Accepted in substance: paragraphs - 1, 2, 3, 5, 6, 7, 9, 19, 20, 21, 22, 24(in part), 25, 26, 27, 28, 29, 30, 31, 32, 34, 35, 36, 37, 38, 39, 40, 41, 42, 45, 47, 48, 49(in part), 50, 51, 52, 53, 54, 56, 57(in part), 58, 59, 60, 61, 63(in part), 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 78, 79, 80, 83, 84, 85, 86(in part), 87, 92, 93, 95, 96, 99, 104, 107, 108(in part), 109(in part), 112, 113, 114, 115, 116, 120, 122, 123, 126, 138, 139, 140, 141, 142, 143(in part), 144, 150, 153, 154, 155, 156, 159, 167, 168, 170, 171, 172, 173, 176, 177, 179, 180, 187, 193, 194, 195, 197, 198, 199, 200, 201, 202, 204, 205. Rejected as argument, subsumed or irrelevant and immaterial: paragraphs - 4(contained in Preliminary Statement), 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 23, 24(in part), 33, 43, 44, 46, 49(in part), 55, 57(in part), 62, 63(in part), 64, 76, 77, 81, 82, 86(in part), 88, 89, 90, 91, 94, 97, 98, 100, 101, 102, 103, 105, 106, 108(in part), 109 (in part), 110, 111, 117, 118, 119, 121, 124, 125, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 143(in part), 145, 146, 147, 148, 149, 151, 152, 157, 158, 160, 161, 162, 163, 164, 165, 166, 169, 174, 175, 178, 181, 182, 183, 184, 185, 186, 188, 189, 190, 191, 192, 196, 203, 206, 207, 208, 209, 210, 211, 212, 213, 214, 215, 216, 217. Proposed findings of fact submitted by Respondent/Petitioner Consolidated Minerals, Inc. and Southwest Florida Water Management District. Accepted in Substance: paragraphs - 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 14, 17, 18, 19, 20, 21, 22(in part), 23, 24, 25(in part), 26, 27(in part), 28, 29(in part), 32, 33(in part), 39, 40, 41, 42, 43, 44, 45, 46, 47, 49, 50, 52(in part), 53, 54, 55, 56, 57(in part), 58, 62, 71, 82, 85, 87, 88, 91, 92(in part), 93, 94(in part), 95(in part), 96(in part), 97(in part), 100(in part), 101, 115, 119, 120, 123, 124(in part), 125(in part), 126(in part), 127(in part), 130(in part), 133(in part), 137, 138(in part), 139, 145. Rejected as argument, subsumed, or irrelevant and immaterial: paragraphs - 12, 13, 15, 16, 31, 36, 37, 38, 48, 51, 52(in part), 57(in part), 59, 60, 63, 80, 81, 83, 84, 86, 90, 94(in part), 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 116, 117, 118, 124(in part), 126(in part), 127(in part), 130(in part), 134, 135, 136, 138(in part), 140, 141, 142, 143. Rejected as against the greater weight of evidence: paragrahs - 22(in part), 25(in part), 27(in part), 29(in part), 30, 33(in part), 34, 35, 61, 64, 65, 66, 67, 68, 69, 70, 72, 73, 74, 75, 76, 77, 78, 79, 89, 92(in part), 95(in part), 96(in part), 97(in part), 98, 99, 100(in part), 102, 103, 121, 122, 125(in part), 128, 129, 131, 132, 133(in part), 144. Proposed findings of fact submitted by Petitoner, Environmental Confederation of Southwest Florida, Inc. Accepted in substance: paragraphs - 1, 2, 3, 4 6, 7, 17, 22, 26, 27, 28, 29, 30, 33(in part), 34, 35, 39(in part) 41, 42, 43, 45, 48, 53, 56, 57, 59, 60, 61, 62, 71, 73, 80, 81, 82, 85, 86, 87, 92(in part), 106, 107, 110, 112, 113, 114, 115, 116, 117, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, 139(in part), 140, 141, 142, 143, 144, 145, 148, 149, 150, 151, 152, 154, 155, 157, 158, 162, 163, 164, 165. Rejected as argument, subsumed, or irrelevant and immaterial: paragraphs - 5, 8, 9, 10, 11, 12, 13, 14, 15, 16, 18, 19, 20, 21, 23, 24, 25, 31, 32 33(in part), 36, 37, 38, 39(in part), 46, 47, 49, 50, 51, 52, 55, 58, 63, 64, 65, 66, 67, 68, 70, 72, 74, 75, 76, 77, 78, 79, 83, 84, 88, 89, 90, 91, 92(in part), 93, 94, 95, 96, 97, 98, 99, 100, 101, 102, 103, 104, 105, 108, 109, 111, 118, 119, 120, 146, 147, 153, 156, 159, 160, 161, 166, 167, 168. Rejected as against the greater weight of evidence: paragraphs - 44, 54, 69, 139(in part). COPIES FURNISHED: Rory C. Ryan, Esquire Roger W. Sims, Esquire HOLLAND & KNIGHT Suite 2600 200 S. Orange Avenue P. O. Box 1526 Orlando, Florida 32802 Vivian Arenas, Esquire Assistant General Counsel Southwest Florida Water Management District 2379 Broad St. Brooksville, Florida 34609 Mr. Alan R. Behrens Route 2, Box 725-A-32 Arcadia, Florida 33821 Matthew G. Minter, Esquire County Attorney 18500 Murdock Cr. Port Charlotte, Florida 33948-1094 David M. Levin, Esquire ICARD, MERRILL, CULLIS, TIMM, FUREN & GINSBURG PO Box 4195 Sarasota, Florida 34237 Kenneth B. Wright, Esquire Sierra Club Legal Defense Fund PO Box 1329 Tallahassee, Florida 32302 Peter G. Hubbell Executive Director 2379 Broad Street Brooksville, Florida 34609-6899

USC (1) 50 CFR 17.12 Florida Laws (7) 120.5717.12373.019373.219373.223373.406373.414 Florida Administrative Code (4) 40D-2.09140D-2.10140D-2.30140D-2.381
# 4
RICHARD L. BUCHANAN vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 82-003543 (1982)
Division of Administrative Hearings, Florida Number: 82-003543 Latest Update: Nov. 01, 1991

Findings Of Fact Petitioner Richard L. Buchanan owns a lot in Franklin County, which lies on the north shore of Apalachicola Bay. Shellfish harvesting is prohibited in the water adjacent to his parcel despite, or perhaps because of, oyster houses having operated in the vicinity for many years. Mr. Buchanan is not an oysterman himself, but he does fish commercially, when he is able. He owns two licensed fishing boats. He goes floundering and also fishes with gill nets. Since he acquired the property 10 or 12 years ago, Mr. Buchanan regularly loaded nets from shore and unloaded fish and nets on shore, until the prop-dredging took place, even though a dock extends out into the Bay from his property. The outboard motor is hard to handle from the dock and it is virtually impossible to load the nets from the dock without fouling them. Until the prop-dredging he could bring his boats all the way in and lay their bows on the shore along the stretch of clean sand 35 to 50 feet wide at the western end of his 145 feet of Bay frontage. There was a sheer drop to a depth, at high water, of about 3.5 feet. The Sadler boy drowned there. Before the prop-dredging disturbed it, the configuration of the bottom that allowed small boats to come all the way into shore at that point had obtained for decades. Leo Nixon Harwell, son of the former owner of petitioner's property, remembered running the Harwells' oyster boat, which drew three feet, right up on the beach. Mr. Harwell, who looked to be in his 50's, testified that there had been deep water next to the shore ever since he was "no yearly boy." The further from shore the deeper it got till you reached Two Mile Channel. Between the sandy beach and the channel there was no vegetation to speak of although there was a marshy swash to the east of the sandy beach. In 1979, when Arman Earl Cloud had to haul his bay shrimper for repairs, he floated it to the beach in back of Mr. Buchanan's house and pulled it up on the beach, using rollers. The bow floated to the water's edge. The boat had a length overall of 25 to 28 feet, a beam of nine feet and drew three to three and a half feet of water. An oyster house sits on the next parcel west of the Buchanan property. The oyster house belongs to a man named Page, and a dock 100 feet long juts out toward Two Mile Channel from the oyster house. It used to be impossible to get an oyster boat in any closer to shore. When John Paul Whitehead was oystering some years back, they used to have to anchor out and transfer the oysters to a skiff to get them to the Page oysterhouse. In fact, when Diane Collins rented the oysterhouse (from Bobby Youngblood) in 1974 or 1975 it was impossible to bring even a flat-bottomed boat in as far as the waterward end of the dock. "On dead low tide all you seen was sand on either side of the dock." According to unrebutted testimony, the Pages changed all this by prop- dredging. (Mr. Page failed to honor the subpoena requiring his attendance at the final hearing.) Prop-dredging involves fixing the bow of a boat by grounding or otherwise, and turning the propeller at speeds high enough to move soils on the bottom. Bay this technique, the Pages dredged great quantities of sand on either side of their dock. Most of the sand stayed suspended in the water only long enough to settle in front of their neighbors' property. This illegal activity was brought to the attention of the marine patrol at the time, whose warning to the Pages to desist went unheeded, and at least one employee of respondent Department of Environmental Regulation was also apprised. The prop- dredging continued for some time, usually at night, and the eventual result was "a muck hill" in front of the Miracle Seafood property abutting the Pages to the west, and a sandbar in front of Mr. Buchanan's property that completely blocks access to his sandy beach. The Pages, with 55 front feet on the Bay, can now accommodate quite a fleet at their dock. One day six to eight boats were docked there. The sandbar in front of Mr. Buchanan's property attributable to the Pages' unpermitted and illegal prop-dredging has by now been there long enough that smooth cord grass (Spartina altiflora), saw grass and maiden cane have taken root. The dredging proposed by petitioner to restore access to his shoreline would disturb some 400 square feet, on which only Spartina altiflora is growing. On about a quarter of the proposed site, there is no vegetation. The Spartina altif lora helps stabilize the shoreline, serves to filter pollutants running off into the Bay and provides a habitat and food for insects, worms, oysters, shrimp and fishes. Dredging would resuspend any heavy metals in the soil, and increase the turbidity of the water, in the immediate vicinity. There is a boat ramp 500 feet from petitioner's property. DER would issue a permit for a marine railway at the site where petitioner hopes to dredge. Apalachicola Bay is classified as Class II waters, and as outstanding Florida waters, being part of an aquatic preserve. There is a clear public interest in permitting a private citizen, who is willing to restore, at his own expense, a part of the coastline disturbed by illegal activity which he responded to the authorities at the time, to the status quo which existed for as long as anybody can remember, before the illegal activity disturbed it. In an undated letter to Mr. Buchanan, James W. MacFarland, Director, Division of State Lands, Department of Natural Resources, advised that Upon the assurance that the environmental effects are acceptable and with the understanding that DER intends to issue the permit, we will request the dredge material severance fees and issue our authorization pursuant to Section 253.77, Florida Statutes, upon the permit receipt. The credible testimony of DER staff was to the effect not that the loss of some 300 square feet of Spartina altif lora would have unacceptable environmental effects, but that the cumulative effect of projects entailing destruction of such grasses would have unacceptable environmental consequences. Respondent's proposed findings of fact, conclusions of law and proposed recommended order have largely been adopted, in substance. To the extent any proposed finding of fact has been rejected, it has been deemed immaterial or unsupported by the weight of the evidence.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That petitioner grant respondent's application for a dredging permit on such reasonable conditions, including turbidity curtains, as are necessary adequately to protect the project vicinity. DONE and ENTERED this 8th day of August, 1983, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of August, 1983. COPIES FURNISHED: E. Gary Early, Esquire Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Richard L. Buchanan P. O. Box 33 Apalachicola, Florida 32320 Victoria Tschinkel, Secretary Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (1) 253.77
# 5
MELLITA A. LANE vs DEPARTMENT OF ENVIRONMENTAL PROTECTION AND INTERNATIONAL PAPER COMPANY, 05-001609 (2005)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida May 04, 2005 Number: 05-001609 Latest Update: Aug. 09, 2007

The Issue The issues in this case are whether IP is entitled to issuance of National Pollutant Discharge Elimination System (NPDES) Permit Number FL0002526-001/001-IW1S ("the proposed permit"), Consent Order No. 04-1202, Authorization for Experimental Use of Wetlands Order No. 04-1442, and Waiver Order No. 04-0730 (collectively, "the Department authorizations"), which would authorize IP to discharge treated industrial wastewater from its paper mill in Cantonment, Escambia County, Florida, into wetlands which flow to Elevenmile Creek and Perdido Bay.

Findings Of Fact Introduction A. The Parties The Department is the state agency authorized under Chapter 403, Florida Statutes (2006),2 to regulate discharges of industrial wastewater to waters of the state. Under a delegation from the United States Environmental Protection Agency (EPA), the Department administers the NPDES permitting program in Florida. IP owns and operates the integrated bleached kraft paper mill in Cantonment, Escambia County, Florida. FOPB is a non-profit Alabama corporation3 established in 1988 whose members are interested in protecting the water quality and natural resources of Perdido Bay. FOPB has approximately 450 members. About 90 percent of the members own property adjacent to Perdido Bay. James Lane is the President of FOPB. Mellita A. Lane, Zachary P. Lane, Peter A. Lane, and Sarah M. Lane are the adult children of Dr. Jacqueline Lane and James Lane. Dr. Lane and James Lane live on property adjacent to Perdido Bay with their son Peter. The Adjacent Waters The mill's wastewater effluent is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. The creek flows southwest into the northeastern portion of Perdido Bay. Elevenmile Creek is a freshwater stream for most of its length but is sometimes tidally affected one to two miles from its mouth. Elevenmile Creek is designated as a Class III water. Perdido Bay is approximately 28 square miles in area and is bordered by Escambia County on the east and Baldwin County, Alabama on the west. The dividing line between the states runs north and south in the approximate middle of Perdido Bay. U.S. Highway 90 crosses the Bay, going east and west, and forms the boundary between what is often referred to as the "Upper Bay" and "Lower Bay." The Bay is relatively shallow, especially in the Upper Bay, ranging in depth between five and ten feet. Perdido Bay is designated as a Class III water. Sometime around 1900, a manmade navigation channel was cut through the narrow strip of land separating Perdido Bay from the Gulf of Mexico. The channel, called Perdido Pass, allowed the salt waters of the Gulf to move with the tides up into Perdido Bay. Depending on tides and freshwater inflows, the tidal waters can move into the most northern portions of Perdido Bay and even further, into its tributaries and wetlands. The Perdido River flows into the northwest portion of Perdido Bay. It is primarily a freshwater river but it is sometimes tidally influenced at and near its mouth. The Perdido River was designated an Outstanding Florida Water (OFW) in 1979. At the north end of Perdido Bay, between Elevenmile Creek and the Perdido River, is a large tract of land owned by IP called the Rainwater Tract. The northern part of the tract is primarily freshwater wetlands. The southern part is a tidal marsh. Tee and Wicker Lakes are small (approximately 50 acres in total surface area) tidal ponds within the tidal marsh. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to Tee and Wicker Lakes from Perdido Bay. The Mill 1. Production Florida Pulp and Paper Company first began operating the Cantonment paper mill in 1941. St. Regis Paper Company (St. Regis) acquired the mill in 1946. In 1984, Champion International Corporation (Champion) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such as printing and writing grades of paper. In 2001, Champion merged with IP, and IP took over operation of the mill. The primary product of the mill continues to be printing and writing paper. The mill is integrated, meaning that it brings in logs and wood chips, makes pulp, and produces paper. The wood is chemically treated in cookers called digesters to separate the cellulose from the lignin in the wood because only the cellulose is used to make paper. Then the "brown stock" from the digesters goes through the oxygen delignification process, is mixed with water, and is pumped to paper machines that make the paper products. There are two paper machines located at the mill. The larger paper machine, designated P5, produces approximately 1,000 tons per day of writing and printing paper. The smaller machine, P4, produces approximately 400 to 500 tons per day of "fluff pulp." 2. The Existing Wastewater Treatment Plant The existing wastewater treatment plant (WWTP) at the mill is described in the revised NPDES permit as a "multi-pond primary and secondary treatment system, consisting of a primary treatment system (primary settling basin, polymer addition, two solids/sludge dewatering basins, and a floating dredge), and secondary treatment system (four ponds in series; two aerated stabilization basins with approximately 2,200 horsepower (HP) of aeration capacity, a nutrient feed system, two non-aerated polishing ponds and a final riffle section to re-aerate the effluent)." The WWTP is a system for reducing the biological oxygen demand (BOD) of the mill's wastewater by bacteria. IP’s wastewater is nutrient deficient when it enters the WWTP. Nutrients in the form of phosphorus and nitrogen must be added for the growth of bacteria. The WWTP begins with a primary settling basin in which suspended solids settle to the bottom. The solids form a sludge that is pumped by hydraulic dredge into two dewatering basins. The dewatering basins are used alternately so that, as one pond is filled, water is removed from the other pond. After being dewatered, the sludge is removed and allowed to dry. Then, it is transported to a landfill located about five miles west of the mill on land owned by IP. The water removed from the dewatering basins moves into to the first aeration basin. The aeration basin has floating aerator devices that add oxygen to facilitate biological conversion of the wastewater. The wastewater then flows sequentially through three more basins where there is further oxygenation and settling of the biological solids. The discharge from the fourth settling basin flows through a riffle section where the effluent is aerated using a series of waterfalls. This is the last element of the treatment process from which the mill's effluent enters waters of the state. Chemicals are added during the treatment process to control phosphorus and color. Chemicals are also added to suppress foam. Sanitary wastewater from the mill, after pretreatment in an activated sludge treatment system, is "sewered" to the mill's WWTP and further treated in the same manner as the industrial wastewater. A separate detention pond collects and treats stormwater from onsite and offsite areas and discharges at the same point as the wastewater effluent from the WWTP. Stormwater that falls on the industrial area of the mill is processed through the WWTP. The discharge point from the WWTP, and the point at which the effluent is monitored for compliance with state effluent limitations, is designated D-001, but is also called the Parshall Flume. The effluent is discharged from the Parshall Flume through a pipe to an area of natural wetlands. After passing through the wetlands, the combined flow runs through a pipe that enters Elevenmile Creek from below the surface. This area is called the "boil" because the water can be observed to boil to the surface of Elevenmile Creek. From the boil, the mill effluent flows approximately 14 miles down (apparently misnamed) Elevenmile Creek to upper Perdido Bay. Regulatory History of the Mill Before 1995, the mill had to have both state and federal permits. The former Florida Department of Environmental Regulation (DER) issued St. Regis an industrial wastewater operating permit in 1982 pursuant to Chapter 403, Florida Statutes. The EPA issued St. Regis an NPDES permit in 1983 pursuant to the Clean Water Act. When it acquired the facility in 1984, Champion continued to operate the mill under these two permits. In 1986, Champion obtained a construction permit from DER to install the oxygen delignification technology and other improvements to its WWTP in conjunction with the conversion of the production process from an unbleached to a modified bleached kraft production process. In 1987, Champion applied to DER for an operating permit for its modified WWTP and also petitioned for a variance from the Class III water quality standards in Elevenmile Creek for iron, specific conductance, zinc, and transparency. DER's subsequent proposal to issue the operating permit and variance was formally challenged.4 In 1988, while the challenges to the DER permit and variance were still pending, Champion dropped its application for a regular operating permit and requested a temporary operating permit (TOP), instead. In December 1989, DER and Champion entered into Consent Order No. 87-1398 ("the 1989 Consent Order"). The 1989 Consent Order included an allegation by DER that the mill's wastewater discharge was causing violation of state water quality standards in Elevenmile Creek for dissolved oxygen (DO), un-ionized ammonia, and biological integrity. The 1989 Consent Order authorized the continued operation of the mill, but established a process for addressing the water quality problems in Elevenmile Creek and Perdido Bay and bringing the mill into compliance in the future. Champion was required to install equipment to increase the DO in its effluent within a year. Champion was also required to submit a plan of study and, 30 months after DER's approval of the plan of study, to submit a study report on the impacts of the mill's effluent on DO in Elevenmile Creek and Perdido Bay and recommended measures for reducing or eliminating adverse impacts. The study report was also supposed to address the other water quality violations caused by Champion. A comprehensive study of the Perdido Bay system was undertaken by a team of 24 scientists lead by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed by a series of related scientific studies, which will be referred to collectively in this Recommended Order as "the Livingston studies." The 1989 Consent Order had no expiration date, but it was tied to the TOP, which had an expiration date of December 1, 1994. Champion was to be in compliance with all applicable water quality standards by that date. The TOP established the following specific effluent discharge limitations for the mill: Monthly Average Maximum Biological Oxygen Demand (BOD) (Mar-Oct) 4,500 lbs/day 6,885 lbs/day (Nov-Feb) 5,100 lbs/day 6,885 lbs/day Total Suspended Solids (TSS) (Mar-Oct) 8,000 lbs/day 27,000 lbs/day (Nov-Feb) 11,600 lbs/day 27,000 lbs/day Iron 3.5 mg/l Specific Conductance 2,500 micromhos/cm Zinc .075 mg/l The limits stated above for iron, specific conductance, and zinc were derived from the variance granted to Champion. Champion was also granted variances from the water quality standards for biological integrity, un-ionized ammonia, and DO. The 1989 Consent Order, TOP, and variance were the subject of the Recommended Order and Final Order issued in Perdido Bay Environmental Association, Inc. v. Champion International Corporation, 89 ER FALR 153 (DER Nov. 14, 1989). Champion's deviation from the standards for iron, zinc, and specific conductance pursuant to the variance was determined to present no significant risk of adverse effect on the water quality and biota of Elevenmile Creek and Perdido Bay. The mill effluent's effect on transparency (reduced by color in the mill effluent) was considered a potentially significant problem. However, because it was found that there was no practicable means known or available to reduce the color, and there was insufficient information at that time to determine how Champion's discharge of color was affecting the biota, Champion was allowed to continue its discharge of color into Elevenmile Creek pending the results of the Livingston studies. In the administrative hearing, the petitioners argued that it was unreasonable to put off compliance for five years, but the hearing officer determined that five years was reasonable under the circumstances. One finding in the Recommended Order and a reason for recommending approval of the TOP and Consent Order was: After the studies referred to in the consent order, the Department will not allow Champion additional time to study problems further. Significant improvements will be required within the five year period and at the end of that period, the plant will be in compliance with all water quality standards or will be denied an operating permit, with related enforcement action. The requirement of the 1989 Consent Order that Champion be in compliance with all applicable standards by December 1994, was qualified with the words "unless otherwise agreed." In considering this wording, the hearing officer opined that any change in the compliance deadline "would require a new notice of proposed agency action and point of entry for parties who might wish to contest any modification in the operational requirements, or changes in terms of compliance with water quality standards." The mill was not in compliance with all water quality standards in December 1994. No enforcement action was taken by the Department and no modification of the 1989 Consent Order or TOP was formally proposed that would have provided a point of entry to any members of the public who might have objected. Instead, the Department agreed through correspondence with Champion to allow Champion to pursue additional water quality studies and to investigate alternatives to its discharge to Elevenmile Creek. In 1994 and 1995, Champion applied to renew its state and federal wastewater permits, which were about to expire. The Department and EPA notified Champion that its existing permits were administratively extended during the review of the new permit applications. Today, the Cantonment mill is still operating under the 1989 TOP which, due to the administrative extension, did not terminate in December 1994, as stated on its face. In November 1995, following EPA's delegation of NPDES permitting authority to the Department, the Department issued an order combining the state and federal operating permits into a single permit identified as Wastewater Permit Number FL0002526-002-IWF/MT. In summary, the permit requirements currently applicable to the operation of the Cantonment paper mill are contained in the following documents: January 3, 1983, EPA NPDES Permit December 13, 1989, DER Temporary Operating Permit (TOP) December 13, 1989, DER Consent Order December 12, 1989, DER Variance November 15, 1995, DEP Order (combining the NPDES permit and the State-issued wastewater permit) April 22, 1996, DEP Letter (clarifying November 15, 1995, Order regarding 1983 NPDES Permit) During the period from 1992 to 2001, more water quality studies were conducted and Champion investigated alternatives to discharging into upper Elevenmile Creek, including land application of the effluent and relocation of the discharge to lower Elevenmile Creek or the Escambia River. In 2001, IP and Champion merged and IP applied to the Department to have the mill permit and related authorizations transferred to IP. Dr. Lane formally challenged the proposed transfer, but she was determined to lack standing. One conclusion of law in the Recommended Order issued in the 2001 administrative case was that the mill was in compliance with the consent order, TOP, and variance. That conclusion was not based on a finding that Champion was in compliance with all applicable water quality standards, but that the deadline for compliance (December 1, 1994) had been extended indefinitely by the pending permit renewal application. In 2001, Dr. Lane twice petitioned the Department for a declaratory statement regarding the Department's interpretation of certain provisions of the 1989 Consent Order. The first petition was denied by the Department because Dr. Lane failed to adequately state her interests and because she was a party in a pending case in which the Consent Order was at issue. Dr. Lane second petition was denied for similar reasons. Over 14 years after the deadline established in the 1989 TOP for the mill to be in compliance with all applicable standards in Elevenmile Creek, IP is still not meeting all applicable standards. However, the combination of (1) Consent Order terms that contemplated unspecified future permit requirements based on yet-to-be-conducted studies, (2) the wording in the TOP that tied the deadline for compliance to the expiration of the TOP, and (3) the administrative extension of the TOP, kept the issue of Champion's and IP's compliance in a regulatory limbo. It increased the Department's discretion to determine whether IP was in compliance with the laws enacted to protect the State's natural resources, and reduced the opportunity of interested persons to formally disagree with that determination. The Proposed Authorizations A. In General In September 2002, while Champion's 1994 permit renewal application was still pending at DEP, IP submitted a revised permit renewal application to upgrade the WWTP and relocate its discharge. The WWTP upgrades consist of converting to a modified activated sludge treatment process, increasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (mgd). IP proposes to convey the treated effluent by pipeline 10.7 miles to a 1,464-acre wetland tract owned by IP5, where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and upper Perdido Bay. IP revised its permit application again in October 2005, to obtain authorization to reconfigure the mill to produce unbleached brown paper for various grades of boxes. If the mill is reconfigured, only softwood (pine) would be used in the new process. On April 12, 2005, the Department issued a Notice of Intent to Issue the proposed NPDES permit, together with Consent Order No. 04-1202, Authorization for Experimental Use of Wetlands Order No. 04-4442, and Waiver Order No. 04-0730. An exemption from water quality criteria in conjunction with the experimental use of wetlands for wastewater treatment is provided for in Florida Administrative Code Rule 62-660.300(1). The proposed exemption order would exempt IP from Class III water quality criteria for pH, DO, transparency, turbidity, and specific conductance. The proposed waiver order is associated with the experimental use of wetlands exemption and relieves IP of the necessity to comply with two exemption criteria related to restricting public access to the area covered by the exemption. The Department and IP contend that restricting public access to Tee and Wicker Lakes is unnecessary. The proposed Consent Order is an enforcement document that is necessary if the mill is to be allowed to operate despite the fact that its wastewater discharge is causing violations of water quality standards. A principal purpose of the proposed Consent Order is to impose a time schedule for the completion of corrective actions and compliance with all state standards. The proposed Consent Order would supersede the 1989 Consent Order. The Proposed NPDES Permit 1. WWTP Upgrades IP's primary objective in upgrading the WWTP was to reduce the nitrogen and phosphorus in the mill's effluent discharge. The upgrades are designed to reduce un-ionized ammonia, total soluble nitrogen, and phosphorus. They are also expected to achieve a modest reduction of BOD and TSS. Upgraded pond 1 is expected to convert soluble BOD to suspended solids and to accomplish other biological conversions seven or eight times faster than the current pond 1. The modification of pond 3 to an activated sludge system is expected to more rapidly remove and recycle the solids back into pond 1. Pond 3 will have a much larger bacterial population to treat the effluent. There would also be additional pH control at the end of pond 3. IP would continue to use its Rock Crossing Landfill for disposal of wastewater sludge removed from the WWTP. Authorization for the landfill is part of the proposed NPDES permit. Groundwater monitoring beneath the landfill is required. The WWTP upgrades would include increased storm surge capacity by converting two existing aeration and settling basins (ponds 2 and 4) to storm surge basins. The surge basins would allow the mill to manage upsets and to withstand a 25-year, 24-hour storm event of 11 inches of rain. Rainfall that falls into the production areas would flow to the WWTP, and be impounded in ponds 2 and 4. After the storm event this impounded water would flow back through the WWTP where it would be treated before flowing through the compliance point and into the pipeline to the wetland tract. The Department required IP to monitor for over 129 pollutants in its stormwater runoff from the mill’s manufacturing facility, roads, parking lots, and offsite nonpoint sources. No pollutants were found in the stormwater at levels of concern. The average volume of mill discharge would be mgd. IP plans to obtain up to 5 mgd of treated municipal wastewater from a new treatment facility planned by the Emerald Coast Utility Authority (ECUA), which would be used in the paper production process and would reduce the need for groundwater withdrawals by IP for this purpose. The treated wastewater would enter the WWTP along with other process wastewater, be treated in the same manner in the WWTP, and become part of the effluent conveyed through the pipeline to the wetland tract. 2. Effluent Limitations The effluent limitations required by the proposed permit include technology-based effluent limits (TBELs) that apply to the entire pulp and paper industry. TBELs are predominantly production-based and are designed to limit the amount of pollutants that may be discharged per ton of product produced. The Cantonment mill has not had a problem in meeting TBELs. The TBELs that IP must meet are in the "Cluster Rule" promulgated by the EPA and adopted by the Department. The mill already meets the TBELS applicable to its current bleaching operation. In fact, EPA determined that the mill was performing in the top 5 percent of similar mills in the nation. The mill would have to meet the TBELs for a brown kraft operation if that conversion is made by IP. The proposed permit also imposes water quality- based effluent limits (WQBELs) that are specific to the Cantonment mill and the waters affected by its effluent discharge. The WQBELs for the mill are necessary for certain constituents of the mill's effluent because the TBELs, alone, would not be sufficient to prevent water quality criteria in the receiving waters from being violated. For example, the TBEL for BOD for similar pulp and paper mills is 15,943 pounds per day (ppd) on a monthly average, but the WQBEL for BOD for the Cantonment mill would be 4,500 ppd in summer and 5,100 ppd in winter. Dr. Livingston developed an extensive biological and chemical history of Perdido Bay and then evaluated the nutrient loadings from Elevenmile Creek over a 12-year period to correlate mill loadings with the biological health of the Bay. Because Dr. Livingston determined that the nutrient loadings from the mill that occurred in 1988 and 1989 did not adversely impact the food web of Perdido Bay, he recommended effluent limits for ammonia nitrogen, orthophosphate, and total phosphorous that were correlated with mill loadings of these nutrients in those years. The Department used Dr. Livingston’s data, and did its own analyses, to establish WQBELs for orthophosphate for drought conditions and for nitrate-nitrite. WQBELs were ultimately developed for total ammonia, orthophosphate, nitrate-nitrite, total phosphorus, BOD, color, and soluble inorganic nitrogen. The WQBELs in the proposed permit were developed to assure compliance with water quality standards under conditions of pollutant loadings at the daily limit (based on a monthly average) during low flow in the receiving waters. The proposed permit also establishes daily maximum limits (the most that can be discharged on any single day). For BOD, the daily maximum limit is 9,000 ppd. William Evans, the Department employee with primary responsibility for the technical review of the proposed Department authorizations, said that setting the daily maximum limit at twice the monthly average was a standard practice of the Department. The maximum daily limits are not derived from the Livingston studies. Dr. Glen Daigger, a civil and environmental engineer, designed a model for the WWTP and determined the modifications necessary to enable the WWTP's discharge to meet all TBELs and WQBELs. Petitioners did not dispute that the proposed WWTP is capable of achieving the TBELs and WQBELs. Their main complaint is that the WQBELs are not adequate to protect the receiving waters. 3. Discharge to the Wetland Tract IP proposes to relocate its discharge to the wetland tract as a means to end decades of failure by the mill to meet water quality standards in Elevenmile Creek. Discharging to the wetland tract, which flows to the marine waters of lower Elevenmile Creek and Perdido Bay, avoids many of the problems associated with trying to meet the more stringent water quality standards applicable in a freshwater stream. An effluent distribution system is proposed for the wetland tract to spread the effluent out over the full width of the wetlands so that their full assimilative capacity is utilized. This would be accomplished by a system of berms running perpendicular to the flow of water through the wetlands, and gates and other structures in and along the berms to gather and redistribute the flow as it moves in a southerly direction toward Perdido Bay and lower Elevenmile Creek. The design incorporates four existing tram roads that were constructed on the wetland tract to serve the past and present silviculture activities there. The tram roads, with modifications, would serve as the berms in the wetland distribution system. As the effluent is discharged from the pipeline, a point designated D-003, it would be re-aerated6 and distributed across Berm 1 through a series of adjustable, gated openings. Mixing with naturally occurring waters, the effluent would move by gravity to the next lower berm. The water will re-collect behind each of the vegetated berms and be distributed again through each berm. The distance between the berms varies from a quarter to a half mile. Approximately 70 percent of the effluent discharged at D-003 would flow by gravity a distance of approximately 2.3 miles to Perdido Bay. The remaining 30 percent of the effluent would flow a shorter distance to lower Elevenmile Creek. A computer simulation performed by Dr. Wade Nutter, an expert in hydrology, soils, and forested wetlands, indicated that the effluent discharged at D-003 will move through the wetland tract at a velocity of approximately a quarter-of-a-foot per second and the depth of flow across the wetland tract will be about one-half inch. It would take four or five days for the effluent to reach lower Elevenmile Creek and Perdido Bay. As the treated effluent flows through the wetland tract, there will be some removal of nutrients by plants and soil. Nitrogen and phosphorous are expected to be reduced approximately ten percent. BOD in the effluent is expected to be reduced approximately 90 percent. Construction activities associated with the effluent pipeline and berm modifications in the wetland tract were permitted by the Department in 2003 through issuance of a Wetland Resource Permit to IP. The United States Army Corps of Engineers has also permitted this work. No person filed a petition to challenge those permits. A wetland monitoring program is required by the proposed permit. The stated purpose of the monitoring program is to assure that there are no significant adverse impacts to the wetland tract, including Tee and Wicker Lakes, and is referred to as the No Significant Adverse Impact (NSAI) analysis. A year of "baseline data" on the wetlands and Tee and Wicker Lakes was collected and submitted to the Department for use in developing the NSAI analysis, but was not made a part of the record in this case. After the discharge to the wetland tract commences, the proposed permit requires IP to submit wetland monitoring reports annually to the Department. A monitoring program was also developed by Dr. Livingston and other IP consultants to monitor the impacts of the proposed discharge on Elevenmile Creek and Perdido Bay. It was made a part of the proposed permit. The Exemption for Experimental Use of Wetlands Florida Administrative Code Rule 62-660.300(1) provides an exemption from water quality criteria for the experimental use of wetlands. The proposed Authorization for Experimental Use of Wetlands Order would exempt IP from Class III water quality criteria for pH, DO, transparency, turbidity, and specific conductance. The proposed exemption order sets forth "interim limits" for pH, DO, color, turbidity, and specific conductance. The proposed exemption order also states that IP may petition for alternative water quality criteria pursuant to Florida Administrative Code Rule 62- 66D.300(1)(b)(c) and (d). The exemption is for 5 years beginning with the commencement of discharge into the wetland tract at D-003. The exemption it can be renewed by IP by application to the Department. The Waiver To qualify for the experimental use of wetlands exemption, Florida Administrative Code Rules 62- 660.300(1)(a)3 and 4 require, respectively, that the public be restricted from the exempted wetland area and that the waters not be used for recreation. IP proposes to prevent public access to the area of the wetland tract where the effluent distribution system is located. This is the freshwater area of the wetland tract and includes the four berms. However, IP does not want, nor believe it is necessary, to prevent public access and recreation on Tee and Wicker Lakes within the tidal marsh below berm 4. These lakes are accessible by boat from Perdido Bay and are used now by the public for boating and fishing. The Proposed Consent Order The proposed Consent Order establishes a schedule for the construction activities associated with the proposed WWTP upgrades and the effluent pipeline and for incremental relocation of the mill's discharge form Elevenmile Creek to the wetland tract. IP is given 24 months to complete construction activities and begin operation of the new facilities. At least 25 percent of the mill's effluent must be diverted to the wetland tract. At least 25 percent of the effluent is to be diverted to the wetland tract when the new facilities begin operations. The volume of effluent diverted to the wetlands is to increase another 25 percent every three months thereafter so that three years after issuance of the permit 100 percent of the effluent is being discharged into the wetland tract and there is no longer a discharge at D-001 into Elevenmile Creek.7 The proposed Consent Order establishes interim effluent limitations that would apply immediately upon the effective date of the Consent Order and continue during the 24-month construction period when the mill will continue to discharge into Elevenmile Creek. Other interim effluent limits would apply during the 12-month period following construction when the upgraded WWTP would be operating and the effluent would be incrementally diverted from Elevenmile Creek to the wetland tract. A third set of interim effluent limits would apply at D-003 when 100 percent of the discharge is into the wetland tract. They include the interim limits for specific conductance, pH, DO, color, and turbidity established through the experimental use of wetland exemption. The proposed Consent Order requires IP to submit a report within six months with the results of the 2004 transparency study. The Department must be satisfied that the study shows the transparency standard will not be violated before the wetlands can be used for the discharge. This report has already been submitted to the Department, but the Department has not yet completed its review of the report. Nevertheless, it was admitted into the record as IP Exhibit 79. The proposed Consent Order provides that, in the event IP's does not receive treated sanitary wastewater from the planned ECUA facility, IP will notify the Department and submit an alternate compliance plan to the Department for the Department's approval. The submittal and approval of an alternate compliance plan would extend the time for compliance with water quality standards by another six months. The Department amended the proposed Consent Order at the conclusion of the hearing to provide for notice to the public and an opportunity for persons to object to the Department's action on any alternate compliance plan. The Consent Order requires a "Plan of Action" to determine "whether there remains a critical period for ortho-phosphate loading to lower Elevenmile Creek and Perdido Bay." The proposed Consent Order requires IP to submit within 97 months (which would allow for five years of discharge to the wetland tract) a final report on whether there has been significant adverse impacts in the wetlands and Tee and Wicker Lakes resulting from the discharge of effluent pursuant to the interim limits for pH, DO, specific conductance, turbidity, and color. If the NSAI analysis shows no significant adverse impact has occurred, the proposed Consent Order contemplates that IP or the Department would establish alternative water quality criteria that would apply permanently in the wetland tract. IP is required by the Consent Order to submit quarterly progress reports of its progress toward compliance with the required corrective actions and deadlines. The Consent Order imposes a "stipulated penalty" of $500 per day for noncompliance with its terms. It also contains a statement that a violation of its terms may subject IP to civil penalties up to $10,000 per day. The Principal Factual Disputes A. The Evidence in General Much of the water quality and biological data presented by Petitioners were limited in terms of the numbers of samples taken, the extent of the area sampled, and the time period covered by the sampling. Much of the expert testimony presented by Petitioners was based on limited data, few field investigations, and the review of some, but not all relevant permit documents.8 On the other hand, the Livingston studies represent perhaps the most complete scientific evaluation ever made of a coastal ecosystem. Even Dr. Lane called the Livingston studies "huge" and "amazing." Therefore, with regard to the factual issues raised by Petitioners that involved scientific subjects investigated in the Livingston studies, Petitioners' data and the expert opinions based on those data were generally of much less weight than the data and conclusions of the Livingston studies. However, the Livingston studies did not address all of the factual issues in dispute. Some of the evidence presented by Petitioners regarding historical water quality conditions in Perdido Bay and Elevenmile Creek was lay testimony. The lay testimony was competent and sufficient to prove the existence of environmental conditions that are detectable to the human senses, such as an offensive smell, a dark color, or a sticky texture. Historical Changes in Perdido Bay Petitioners claim that, before the Cantonment mill began operations in the 1940s, Perdido Bay was a rich and diverse ecosystem and a beautiful place for swimming, fishing, boating, and other recreational activities. Petitioners blame the mill effluent for all the adverse changes they say have occurred in Perdido Bay. Petitioners claim that the water in Perdido Bay was much clearer before the mill was built. James Lane, who has lived on the Bay for 65 years, said he began to notice in the late 1940s that the water was becoming dark and filled with wood fibers. Mr. Lane recalls that there used to be an abundance of fish in the Perdido Bay, including croakers, pinfish, flounder, redfish, minnows, and catfish. Now Mr. Lane sees few of these fish in the Bay and he believes the remaining fish are unfit to eat because they look diseased to him. Mr. Lane said there were extensive areas of sea grasses in the Bay which supported large numbers of shrimp, crabs, and mussels, but these grasses are now gone. The Lane family used to enjoy swimming in Perdido Bay but stopped swimming years ago because the water felt sticky and often had a brown foam or scum on the surface. Mr. Lane and others members of FOPB claim to have gotten infections from swimming in the Bay. Mr. Lane and other witnesses described the odor of Elevenmile Creek near the mill as unpleasant and, at times, offensive. They consider the Creek to be too polluted for swimming. Donald Ray, who has been a Department biologist for 30 years, said he has received many complaints from citizens about the conditions in Perdido Bay. He said the foam that occurs in Perdido Bay is not natural foam, but one that persists and leaves a stain on boats. On the other hand, it is Dr. Livingston's opinion that the ecological problems of Perdido Bay are due primarily to the opening of Perdido Pass around 1900. The opening of the pass allowed Gulf waters to enter Perdido Bay and caused salinity stratification in the Bay, with marine waters on the bottom and fresh water from the Perdido River, Elevenmile Creek, and other tributaries on the top. The stratification occurs regularly in the lower Bay, but only during low flow conditions in most of the upper Bay, Perdido River, and Elevenmile Creek. It restricts DO exchange between the upper and lower water layers and results in low DO levels in the lower layer. Low DO, or "hypoxia," is the primary cause of reduced biological diversity and productivity in Perdido Bay. Dr. Livingston's initial study of the Perdido Bay system (1988-91) included an investigation of historical conditions, using documents and maps, anecdotal statements of area residents, as well as historic water quality and sediment data. Dr. Livingston found general agreement from most sources that: [P]rior to the 1940s, the various rivers and the bay in the Perdido Basin were quite different from what they are today. Eyewitness accounts from 1924 indicate a bay that was clear and "bluish" in color; the bottom could be seen at depths of five feet. According to resident' accounts, seagrasses grew from Garth Point to Witchwood; the grassbeds provided cover for many shrimp that were taken at the time. Flounder were taken with gigs and crabs were taken with hand nets. According to these accounts, the water from the various rivers and creeks in the area was relatively clear, and white sand/gravel bottoms were dominant forms of habitat in the freshwater and estuarine systems. The water was tea- colored but clear. Redfish, trout, blue crabs, shrimp, and mullet were abundant. * * * [T]hrough the early 1900s, the Elevenmile Creek was said to be crystal clear with soft white sand and good fishing. * * * According to various reports, in the early 1950s, the waters of Elevenmile Creek turned black, with concentrations of foam observed floating on the surface. By 1986, more than 28 million gallons of largely untreated effluent was flowing into the Elevenmile Creek- Perdido Bay system each day. Experiments by the Florida Game and Fresh Water Fish Commission had shown that the creek waters were lethal. The Florida Board of Health reported that Elevenmile Creek was "grossly polluted" and that Perdido Bay had been "greatly degraded within the 1.5 mile radius of where Elevenmile Creek dumped into the bay." Nevertheless, Dr. Livingston discounted much of this historical record, especially with regard to the belief that the mill's effluent had adversely affected Perdido Bay, because it was not based on what he considers reliable scientific data. He found "little evidence in the long- term sediment record of a direct response to historical activities of the pulp and paper mill, suggesting that the flushing capacity of Perdido Bay quickly diluted effluents that enter Perdido Bay from Elevenmile Creek." The evidence is persuasive that the salinity stratification in Perdido Bay is a major cause of low DO in the Bay.9 However, the stratification does not explain all of the observed changes in water quality, biological productivity, and recreational values. The stratification does not account for the markedly better conditions in the Bay that existed before the Cantonment paper mill began operations. The Livingston studies confirmed that when nutrient loadings from the mill were high, they caused toxic algae blooms and reduced biological productivity in Perdido Bay. As recently as 2005, there were major toxic blooms of heterosigma in Tee and Wicker Lakes caused by increased nutrient loading from the mill. Other competent evidence showed that the mill's effluent has created nuisance conditions in the past, such as foam and scum, which adversely affected the recreational values of these public waters. Some of the adverse effects attributable to the mill effluent were most acute in the area of the Bay near the Lanes' home on the northeastern shore of the Bay, because the flow from the Perdido River tends to push the flow from Elevenmile Creek toward the northeastern shore. Petitioners were justified in feeling frustrated in having their concerns about the adverse impacts of the mill's effluent discounted for many years, and in having to wait so long for an effective regulatory response. However, with regard to many of their factual disputes, Petitioners' evidence lacked sufficient detail regarding the dates of observations, the locations of observations, and in other respects, to distinguish the relative contribution of the mill effluent from other factors that contributed to the adverse impacts in the Bay, such as salinity stratification, natural nutrient loading from the Perdido River and other tributaries, and anthropogenic sources of pollution other than the paper mill.10 Petitioners generally referred to the mill effluent and its impacts to Perdido Bay as if they have been relatively constant for 65 years. The Livingston studies, however, showed clearly that the mill effluent and its impacts, as well as important factors affecting the impacts, such as drought, have frequently changed. Focusing on the fact that the average daily BOD loading allowed under the proposed permit would be same as under the 1989 TOP (4,500 ppd), Petitioners remarked several times at the final hearing that the proposed permit for the mill was no different than the existing permit. According to Petitioners, if the mill is allowed to operate under the proposed permit, one can predict that the future adverse impacts to Perdido Bay will be the same as the past adverse impacts. However, the 1989 TOP and the proposed permit are very different. Therefore, it cannot be assumed that the impacts would be the same. Petitioners' evidence was generally insufficient to correlate past adverse impacts to Perdido Bay with the likely impacts that would occur under the proposed permit. In contrast, that was the focus of the Livingston studies. Development of the WQBELs Whether Perdido Bay is an Alluvial System and Whether Elevenmile Creek is a Blackwater Stream Alluvial systems are generally characterized by relatively high nutrient inputs from tributaries and associated wetlands that provide for high biological productivity in the receiving bay or estuary. Petitioners disagree with Dr. Livingston's characterization of the Perdido Bay system as an alluvial system. Petitioners presented the testimony of Donald Ray, a Department biologist, who said that the Perdido River is not an alluvial river and the natural nutrient loadings to Perdido Bay are less than would occur in an alluvial system. Although it is curious that two experienced biologists cannot agree on whether Perdido Bay is part of an alluvial system, the dispute is immaterial because it was not shown by Petitioners that any of the four proposed Department authorizations is dependent on the applicability of the term "alluvial." The WQBELs developed by Dr. Livingston, for example, were not dependent on a determination that Perdido Bay meets some definition of an alluvial system, but were based on what the data indicated about actual nutrient loadings into Perdido Bay and the Bay's ecological responses to the loadings. If the dispute is not immaterial, then Dr. Livingston's opinion that Perdido Bay is part of an alluvial system is more persuasive, because he has greater experience and knowledge of the coastal bay systems on the Florida Panhandle than does Mr. Ray. Petitioners also take exception to Dr. Livingston's characterization of Elevenmile Creek as a blackwater creek. Petitioners claim Elevenmile Creek is naturally clear to "slightly tannic" stream. This dispute, however, is also immaterial because the proposed permit calls for the termination of the mill's discharge to Elevenmile Creek, including its contribution of color to the Creek. Petitioners assert that Dr. Livingston's characterizations of Perdido Bay as an alluvial system and Elevenmile Creek as a blackwater creek show he is biased and that his "overall analysis" lacks credibility. Dr. Livingston's opinions on these points do not show bias nor compromise the credibility of his overall analysis of the Perdido Bay system, which is actually the product of many scientists and based on 18 years of data.11 2. Selection of 1988 and 1989 Mill Loadings as a Benchmark for the WQBELs Generally, the Department establishes effluents limits for nutrients based on Chlorophyl A analysis. However, the Livingston studies showed that Chlorophyl A was not significantly associated with plankton blooms in Perdido Bay. Therefore, the Department accepted Dr. Livingston's recommendation to base the WQBELs for nutrients on the nutrient loading from the mill in 1988 and 1989, which the Livingston studies showed were good years for Perdido Bay with respect to its biological health. Phytoplankton are a fundamental component of the food web in Perdido Bay. The number of phytoplankton species is a sensitive indicator of the overall ecological health of the Bay. The Livingston studies showed that the loadings of ammonia and orthophosphate from the mill had a direct effect on the number of phytoplankton species. In the years when the mill discharged high loadings of ammonia and orthophosphate, there were toxic algae blooms and reduced numbers of phytoplankton species. In 1988 and 1989, when the loadings of ammonia and orthophosphate were lower, there were no toxic algae blooms, and there were relatively high numbers of phytoplankton species. Petitioners dispute that 1988 and 1989 are appropriate benchmarks years for developing the WQBELs because Petitioners claim there were high nutrient loadings and algae blooms in those years. Mr. Ray testified that the Department received citizen complaints about algae blooms in those years. Dr. Livingston's analysis was more persuasive, however, because it distinguished types of algae blooms according to their harmful effect on the food web and was based on considerably more water quality and biological data. Petitioners also presented water quality data collected from 1971 to 1994 by the Bream Fishermen Association at one sampling station in the northeastern part of Perdido Bay, which indicate that in 1988 and 1989, the concentrations of nutrients were sometimes high. The proposed nutrient WQBELs were derived from data about the actual response of the Perdido Bay ecosystem over time to various inputs. The sampling data from the Bream Fishermen Association were not correlated to ecosystem response and, therefore, are insufficient to refute Dr. Livingston's evidence that 1988 and 1989 were years of relatively high diversity and productivity in Perdido Bay. Furthermore, nutrients loadings would be reduced under the proposed permit. 3. DO and Sediment Oxygen Demand The parties agreed that sediment oxygen demand (SOD) is a major reason for the low DO in Perdido Bay in areas where there is salinity stratification. SOD is caused by the bacterial degradation of particulate organic matter that settles to the bottom. SOD decreases DO in the lower water layer, but also can cause a reduction of DO in the surface layer. Low DO has substantially reduced the biological productivity of Perdido Bay. Thomas Gallagher, an environmental engineer and water quality modeling expert, showed that even without the mill discharge, DO in the bottom waters of Perdido Bay would fall below the applicable Class III water quality standard of 5 mg/l. Low DO conditions are now a "natural" characteristic of the Bay, usually occurring during summer and early fall when freshwater flows are low and temperatures are high. At these times, surface water DO levels are usually above the state standard, but DO in the bottom waters usually range between 1.0 and 2.0 mg/l. Petitioners claim that the dominant source of the sediment in Perdido Bay is the carbon and nutrient loading in the mill's effluent that flows into the Bay from Elevenmile Creek. Mr. Ray, who sampled sediments in Perdido Bay over several years for the Department, believes that the mill effluent is the main source of the sediment and, consequently, the sediment oxygen demand. Dr. Livingston did extensive sediment analyses in Perdido Bay. He compared the data with sediment data from other bays on the Florida Panhandle. It is Dr. Livingston's opinion that the mill effluent contributes little to the sediments or SOD in Perdidio Bay. His initial three-year study concluded: [T]he hypoxic conditions of Elevenmile Creek are due, in part, to mill discharges. However, low dissolved oxygen conditions at depth in Perdido Bay are not due to the release of mill effluents from Elevenmile Creek, and can actually be attributed to a long history of human activities that include alteration of the hydrological interactions at the gulfward end of the estuary. The entry of saline water from the Gulf and the resulting stratification have been coupled with various forms of human development that release carbon, nitrogen, and phosphorus compounds into the estuary. The landward movement of high-salinity water from the Gulf of Mexico, laden with various types of oxygen-consuming compounds from various sources, together with oxygen demand from sediments to the lower water column that is isolated from reaeration due to salinity stratification, are thus responsible for a large portion of the observed hypoxic conditions at depth in Perdido Bay. [The paper mill] is responsible for a relatively small amount of these oxygen-consuming effects. In East Bay, which is a part of Escambia Bay and a relatively pristine system, there was SOD that caused DO to fall below standards in the lower water layer. Dr. Livingston also found severe oxygen deprivation at times in the lower waters of the Styx River and Perdido River, which do not receive mill effluent. Dr. Livingston believes the low DO that occasionally occurs in these rivers is due to agricultural runoff, urban discharges, and natural organic loading from adjacent wetlands. There was extensive evidence, some of which was presented by Petitioners, showing that the mill loadings of carbon and nutrients are less than the loadings from the Perdido River. Mr. Gallagher concluded that the sediment in the Bay is mostly "terrestrial carbon," and not from the mill's effluent. His water quality modeling work determined that the mill's effluent reduced bottom layer DO by about 0.1 mg/l. Dr. Lane believes that the organic solids in the mill's effluent are accumulating in Perdido Bay sediments, but Mr. Gallagher pointed out that degrading solids cannot accumulate because they are degrading. In addition, Mr. Gallagher said that logic dictates that solids that have not settled out after spending several days in the settling basins of IP's WWTP are not going to readily settle in the more turbulent environment of Perdido Bay. Some of the solids are oxidizing or being transported into the Gulf. Mr. Gallagher determined that in summer and late fall, 60 percent of the water in the bottom layer in the upper Bay is from the Gulf and almost all the rest is from the Perdido River. He believes only 0.1 to 2.0 percent of the water in the bottom layer is mill effluent. Dr. Livingston responded to the BOD and carbon issues that "these Petitioners raised over the years" by investigating them as part of the Livingston studies. He found no relationship between loading and DO. Dr. Livingston concluded that the mill was not having much effect on SOD. Dr. Livingston and Mr. Gallagher referred to a carbon isotope study of the sediment in Perdido Bay by Coffin and Cifuentes. The isotope study was a part of the initial three-year Livingston study entitled "Ecological Study of the Perdido Bay Drainage System." The study identified a unique carbon isotope in the mill's effluent and looked for traces of the isotope in the sediments of Perdido Bay. Very little of the carbon isotope was found in the sediments, suggesting that the mill's effluent was not contributing much to the sediments. The carbon isotope study was not offered into evidence. Petitioners assert that the isotope study is hearsay and cannot be used to support a finding of fact.12 However, Dr. Livingston's opinion about the sources of the sediment was not based solely on the isotope study. The isotope study was consistent with his other studies and with Mr. Gallagher's water quality modeling analysis. Therefore, the conclusions of the isotope study serve to support and explain Dr. Livingston's expert opinion that the mill effluent is not the primary source of the sediment and low DO in Perdido Bay. Dr. Livingston summarized his opinion regarding DO and SOD as follows: "all of these lines of evidence, from all the bays that I have worked in and from them scientific literature and from our own studies, every line of evidence simply eliminated the pulp mill as the primary source of the low dissolved oxygen in the bay." 4. Long-term BOD BOD is a measurement of the oxygen demand exerted by the oxidation of carbon, nitrogen, and the respiration of algae. A five-day BOD analysis is the standard test used in the regulatory process. The use of the standard five-day BOD measurement is not restricted to organic material that is expected to completely degrade in five days. Five days is simply the time period selected to standardize the measurement. For example, the five-day BOD analysis is used in the regulation of domestic wastewater even though most of the organic material in domestic wastewater takes about 60 days to degrade and would exert an oxygen demand throughout the 60 days. It was undisputed that paper mill effluent will continue to consume DO after five days. One estimate given was that it would take 100 days to completely degrade. Some of the naturally occurring organic material flowing into Perdido Bay from the Perdido River and Gulf of Mexico would also include material with long-term BOD. Petitioners claim that long-term BOD analysis is essential to determine the true impacts of the mill's effluent on Perdido Bay, but they failed to show that the Livingston studies did not consider long-term BOD.13 The evidence shows that Dr. Livingston's studies accounted for DO demand in all its forms and for any duration. Dr. Livingston's studies focused on the response of Perdido Bay's food web to nutrients and various other inputs as they changed over time. If long-term BOD was having an adverse effect on the food web, the Livingston studies were designed to detect that effect. Dr. Livingston's opinion is that long-term BOD is not a significant problem for Perdido Bay because the Bay is part of a dynamic system and the sediments are regularly flushed out or otherwise recycled in a matter of a few months, not years.14 5. Carbon Dr. Lane, who is a marine biologist, believes a major reason for low DO in Perdido Bay is "organic carbonaceous BOD." However, Dr. Lane presented no evidence other than statements of the theoretical process by which carbon from the mill would cause low DO in the Bay. She presented no scientific data from Perdido Bay to prove her theory.14 Dr. Livingston said that 16 years of studies in the Bay have found DO and carbon to be "totally uncorrelated." Other Water Quality Issues 1. Toxicity Petitioners allege that the mill effluent has had occasional problems passing toxicity tests. Un-ionized ammonia is the likely cause, and the reduction of un-ionized ammonia in the proposed permit and the distribution of the effluent over the wetland tract should prevent toxicity problems from recurring. Dr. Livingston examined tissue samples from various fish and invertebrates and found low levels of bioconcentrating chlorine compounds in Perdido Bay that he believes were "probably associated with discharges from the Pensacola mill." Although they are toxic substances, Dr. Livingston found no diseased organisms and no evidence of food web magnification of these potentially bioaccumulable compounds. Mr. Ray testified that Perdido Bay was the worst of all the bays he has studied in terms of high sediment metals. Most of his sediment sampling was done in 1977 through 1983, years before the Livingston studies got started. His knowledge about subsequent years was based on only two samples, one in 1988 and another in 2005.16 Dr. Lane did an analysis of 12 sediment samples in Perdido Bay, Perdido River, and Elevenmile Creek in 1999 and concluded that "Eleven Mile Creek appears to be the source of all elevated levels [of metals] except silver." The Livingston studies included toxics analysis of Perdido Bay sediments, including metals, dioxin, and other chlorinated organic compounds. Dr. Livingston testified that metal concentrations in the sediments of Elevenmile Creek did not differ from the metal concentrations in the Perdido River and other streams in the area. The concentrations were not significantly different from concentrations in other bays he has studied that do not have a paper mill discharge. 2. Mutagenic Compounds Petitioners claim that there are chemicals in paper mill effluent that are mutagenic and are causing changes in the sex of fish. They introduced an exhibit from the Department's exhibit list (DEP Exhibit 38) that discussed investigations of effluent from the Cantonment mill and other Florida paper mills which found abnormally high testosterone levels and related mutations in female Gambusia fish. The most recent such study16 implicates androgens produced by the microbial degradation of natural chemicals in the trees pulped at the mills, especially softwood trees (pines), as the cause. Petitioners believe IP's proposal to begin using 100 percent pine at the Cantonment mill could cause mutations in fish and other animals exposed to the mill's effluent. Although IP and the Department are aware of the sex change studies, there was no evidence presented that the subject was investigated or addressed by them in the permitting process. DEP Exhibit 38 is hearsay and no non-hearsay evidence was presented on the issue of mutagenic compounds in the mill's effluent. Therefore, no finding of fact in this Recommended Order can be based on the data and analysis in DEP Exhibit 38.18 Furthermore, Petitioners did not raise the issue of mutagenic compounds in the mill's effluent discharge in their petitions for hearing or in the pre-hearing stipulation.19 Antidegradation Policy Petitioners claimed the proposed permit violated the antidegradation policy for surface waters established in Florida Administrative Code Rule 62-302.300(1). An element of that policy is to require, for any discharge that degrades water quality, a demonstration that the degradation is necessary or desirable under circumstances which are clearly in the public interest. Florida Administrative Code Rule 62-4.242(1)(a) contains a list of factors to be considered and balanced in applying the antidegradation policy. These include consideration of whether the proposed project would be beneficial to public health, safety, or welfare and whether the discharge would adversely affect the, conservation of fish and wildlife, and recreational values. The greater weight of the evidence supports the position of IP and the Department that the proposed discharge to the wetland tract would be an improvement over the existing circumstances. However, as discussed below, there was an insufficient demonstration that the discharge would not cause significant adverse impact to the biological community within the wetland tract, and there was an insufficient demonstration that the Perdido River OFW would not be significantly degraded. Without sufficient demonstrations on these points, it is impossible to find that the degradation has been minimized. Petitioners did not prove that the proposed project was not in the public interest, but the burden was on IP to show the opposite. Because IP did not make a sufficient demonstration regarding potential adverse impacts on the biological community within the wetland tract and on the Perdido River OFW, IP failed to prove compliance with Florida's antidegradation policy. Perdido River OFW Florida Administrative Code Rule 62-302.300(2) contains the standards applicable to OFWs and prohibits a discharge that significantly degrades an OFW unless the proposed discharge is clearly in the public interest or the existing ambient water quality of the OFW would not be lowered.20 Petitioners contend that the water quality of the Perdido River would be significantly degraded by the mill's effluent under the authorizations. Mr. Gallagher's modeling analysis predicted improved water quality in the Perdido River for DO and several other criteria over the conditions that existed in 1979, the year the river was designated as an OFW. However, the modeling also predicted that the discharge would reduce the DO in the river (as it existed in 1979) by .01 mg/l under unusual conditions of effluent loading at the daily limit (based on a monthly average) during a drought. Mr. Gallagher's modeling indicated that a very small (less than 0.1 mg/l) reduction in DO in the surface water of the lower Perdido River would occur as a result of the proposed project. He considered that to be an "insignificant" effect and it was within the model's range of error. However, IP made the wrong comparisons in its modeling analysis to determine compliance with the OFW rule, Florida Administrative Code Rule 62-4.242(2). Mr. Gallagher used the model to compare the DO levels in the Perdido River that would result from the mill's discharge of BOD at the proposed permit limit of 4,500 ppd with the predicted DO levels that would have existed in 1979 if St. Regis was discharging 5,100 ppd of BOD. IP should have compared the DO levels resulting from the proposed permit with the actual DO levels in 1979, or at least the DO levels that the model would have simulated using actual BOD loadings by St. Regis in 1979. The DO levels that would have existed in 1979 if St. Regis had discharged 5,100 ppd of BOD are irrelevant. No DO data from 1979 were presented at the hearing and no explanation was given for why DO data for 1979 were not used in the analysis. No evidence was presented that St. Regis discharged 5,100 ppd of BOD as a monthly average in 1979.21 It might have discharged substantially less.22 Petitioners did not prove that the proposed permit would significantly degrade the Perdido River, but the burden was on IP to show the opposite. Because the wrong anti-degradation comparison was made, IP failed to provide reasonable assurance that the Perdido River would not be significantly degraded by the proposed discharge. The Experimental Use of Wetlands Exemption Petitioners claim that IP did not demonstrate compliance with all the criteria for the experimental use of wetlands exemption. There are seven criteria set forth in Florida Administrative Code Rule 62-660.300(1)(a) that must be met to qualify for the exemption. IP is seeking a waiver from two of the criteria and those will be discussed later in this Recommended Order. Impact on the Biological Community a. In General Florida Administrative Code Rule 62- 660.300(1)(a)1 requires a demonstration that "the wetlands ecosystem may reasonably be expected to assimilate the waste discharge without significant adverse impact on the biological community within the receiving waters." Dr. Nutter used a "STELLA" wetland model to predict the effects of discharging mill effluent to the wetland tract. The STELLA model was programmed to evaluate the "water budget" for the wetland tract, as well as simulate the fate of nitrogen, phosphorus, and total dissolved solids (TDS). Petitioners contend that the STELLA model is too limited to adequately assess potential adverse impacts on the biological community, but the model was not the sole basis upon which Dr. Nutter formed his opinions. He also relied on relevant scientific literature, his general knowledge of wetland processes, and on his 40 years of experience in land treatment of wastewater. The STELLA model predicted that there would be about a 10 percent reduction in nitrogen and phosphorus. Dr. Nutter testified that that figure was a conservative prediction and the scientific literature suggests there could be a greater reduction. Wetlands are effective in processing TSS and BOD. Dr. Nutter ran the model with the proposed permit limits and the model predicted 90 to 95 percent BOD removal before the effluent reached berm 4. Dr. Nutter expected pH levels to be in the range of background levels in the wetlands, which vary between 6.5 and 8.0.23 Dr. Nutter predicts that in high flow conditions, there will be more DO in the water flowing from the wetlands into Tee and Wicker Lakes. During low flow conditions, he predicts no change in the DO level. Background DO levels in the wetland tract now range between and 5.0 mg/l. Mr. Gallagher's water quality modeling for Perdido Bay assumed that the water flowing from the wetland tract would have a DO level of 2.0 mg/l, which Dr. Nutter believes this is a conservative estimate, meaning it could be higher. Specific Conductance A fundamental premise of the relocated discharge is that it solves the mill's decades-long failure to meet the stricter water quality standards applicable in the fresh waters of Elevenmile Creek because the new receiving waters would be marine waters. However, the majority (about 70 percent) of the wetland tract is a freshwater wetland. The tidal influence does not reach above berm 4 in the wetland tract. Before the mill's effluent reaches marine waters, it would be distributed over the entire freshwater portion of the wetland tract. Dr. Livingston explained that, but for the mill's discharge, minnows and other small "primary" freshwater fish species would be found in Elevenmile Creek. The primary fish cannot tolerate the mill's discharge because the high levels of sodium chloride and sulfide (specific conductance) cause osmoregulatory problems, disrupting their blood metabolism and ion regulation. High conductivity also eliminates sensitive microinvertebrates. Because Tee and Wicker Lakes are in the tidally influenced, southern portion of the wetland tract, the fish and other organisms in the lakes are polyhaline, which means they are adapted to rapid changes in salinity, temperature and other habitat features. That is not true of the organisms in the freshwater area of the wetland tract. A constructed wetlands pilot project was built in 1990 at the Cantonment mill. The initial operational phase of the pilot project was July 1991 through June 1993. A second phase was conducted for just three months, from September 1997 through December 1997. The pilot project generated some information about "benthic macroinvertebrate diversity," which was "low to moderate." In addition, there were "observations" made of "three amphibian species, three reptile species, approximately 31 bird species, three fish species that were introduced, and two mammal species." The information generated by the pilot project is ambiguous with respect to the effect of the effluent on fish and other organisms attributable to the specific conductance of the effluent, indicating both successes and failures in terms of survival rates. Moreover, the data presented from the pilot wetland project lacks sufficient detail, both with respect to the specific conductivity of the effluent applied to the wetlands and with respect to the response of salt-intolerant organisms to the specific conductivity of the effluent, to correlate the findings of the pilot project with the proposed discharge to the wetland tract. Freshwater wetlands do not have naturally high levels of specific conductance. The specific conductance in the wetland tract is 100 micromhos/cm or less.24 The proposed interim limit for specific conductance for the discharge into the wetland tract is "2,500 micromhos/cm or 50% above background, whichever is greater." Using total dissolved solids (TDS) as a surrogate for analyzing the effects on specific conductance, Dr. Nutter predicted that average TDS effluent concentrations would only be reduced by 1.0 percent.25 His prediction is consistent with the literature on the use of wetlands for wastewater treatment, which indicates wetlands are not effective in reducing TDS and specific conductance. The wetland tract would not assimilate TDS in mill's effluent. The potential exists, therefore, for the discharge to cause specific conductance in the freshwater area of the wetland tract to reach levels that are too high for fish and other organisms which can only live, thrive, and reproduce in waters of lower specific conductance. It was the opinion of Barry Sulkin, an environmental scientist, that the "freshwater community" would be adversely impacted by the salts in the effluent. Although the freshwater area of the wetland tract is not dominated by open water ponds, creeks, and streams,26 the evidence shows that it contains sloughs, creeks, and other surface water flow. No evidence was presented about the biological community associated with the sloughs, creeks, and other waters in the wetland tract, other than general statements about the existing plants and the trees that are being planted. Petitioners did not prove that granting the exemption would cause significant adverse impact to the biological community in the freshwater area of the wetland tract, but it was IP's burden to affirmatively demonstrate the opposite. Because IP did not adequately address the impact of increased specific conductance levels on fish and other organisms in the freshwater area of the wetland tract, IP did not provide reasonable assurance that the proposed discharge would be assimilated so as not to cause significant adverse impact on the biological community within the wetland tract. Tee and Wicker Lakes When the Department issued the proposed exemption order, it did not have sufficient data and analyses regarding Tee and Wicker Lakes to determine with reasonable confidence that these waterbodies would not be adversely impacted by the proposed discharge. A transparency study of the lakes, which IP introduced as an exhibit at the final hearing, had not previously been reviewed by Department staff. Dr. Livingston is still developing data and analyses for the lakes to use in the NSAI analysis. The proposed NSAI monitoring plan states that one of its objectives is to determine the "ecological state" of the tidal ponds, including whether the ponds "could comprise an important nursery area for estuarine populations." In addition, the monitoring is to determine "the normal distributions of salinity, temperature, color, and dissolved oxygen" in the tidal ponds. These are data that must be known before a determination is possible that the discharge would not have a significant adverse impact on the biological community associated with the lakes. Petitioners did not prove that granting the exemption would cause significant adverse impact to the biological community of Tee and Wicker Lakes, but it was IP's burden to affirmatively demonstrate the opposite. Because insufficient data exists regarding baseline conditions in Tee and Wicker Lakes, IP did not provide reasonable assurance that the proposed discharge would not cause significant adverse impact on the biological community within the wetland tract. 2. Public Interest and Public Health Florida Administrative Code Rule 62- 660.300(1)(a)2. requires the applicant to demonstrate that "granting the exemption is in the public interest and will not adversely affect public health or the cost of public health or other related programs." Public Interest Petitioners made much of a statement by Mr. Evans that the public interest consideration in this permit review was “IP’s interest”. Petitioners claimed that this statement was an admission by the Department that it gave no consideration to the public interest. However, in context, Mr. Evan's statement was not such an admission. Moreover, Florida Administrative Code Rule 62-302.300(6) expressly provides that the public interest is not confined to activities conducted solely for public benefits, but can also include private activities conducted for private purposes. The proposed exemption order does not directly address the public interest criterion, but it notes that "existing impacted wetlands will be restored." In IP's application for the exemption, it states that the exemption would "contribute to our knowledge of wetlands in general and to the refinement of performance guidelines for the application of pulp mill wastewater to wetlands." Petitioners dispute that the wetland tract is being restored. The evidence shows that some restoration would be accomplished. The natural features and hydrology of the tract have been substantially altered by agriculture, silviculture, clearing for pasture, ditching, and draining. The volume of flow in the discharge would offset the artificial drainage that occurred. A mixture of hardwood tree species would be planted, which would restore more of the diversity found in a natural forested wetland. However, an aspect of the project that could substantially detract from the goal of restoration is the transformation of the freshwater wetlands to an unnatural salty condition. Dr. Nutter said that the salt content of the mill's effluent was equivalent to Gatorade, but for many freshwater organisms, that is too salty. Another public benefit of the exemption that was discussed at the final hearing is that it would allow IP to relocate its discharge from Elevenmile Creek and thus end its adverse impacts to the Creek. That public benefit is not given much weight because IP has not shown that its adverse impacts to Elevenmile Creek cannot be eliminated or substantially reduced by decreasing its production of paper products. The evidence shows only that IP has attempted to solve its pollution problems through environmental engineering.27 A sufficient public interest showing for the purpose of obtaining the experimental use of wetlands exemption should not be a rigorous challenge if all the other exemption criteria are met, because that means the proposed wetland discharge was shown to have no harmful consequences. The public interest showing in this proceeding was insufficient, however, because the other exemption criteria were not met and there is a reasonable potential for harmful consequences. Public Health Petitioners raised the issue of the presence of Klebsiella bacteria, which can be a public health problem when they occur at high levels. The more detection of Klebsiella, however, does not constitute a public health concern. Petitioners did not show that Klebsiella bacteria exist in the mill's effluent at levels that exceed applicable water quality standards. Petitioners also did not present competent evidence about the likely fate of Klebsiella bacteria in the proposed effluent distribution system. Dr. Lane's statement that Klebsiella bacteria might be a problem is not sufficient to rebut IP's prima facie showing that the proposed permit will not cause or contribute to a violation of water quality standards applicable to pathogenic bacteria. Petitioners also point to past incidents of high total coliform concentrations in Elevenmile Creek in support of their contention that the proposed exemption poses a risk to public health. However, these past incidents in Elevenmile Creek are not sufficient to prove that fecal coliform in the effluent discharged to the wetland tract will endanger the public health. IP proposes to restrict access to the wetland distribution system. Furthermore, the fate of bacteria in the wetlands is much different than in the Creek. The more persuasive evidence is that the wetland tract would destroy the bacteria by solar radiation and other mechanisms so that bacteria concentrations in waters accessible by the public would not be at levels which pose a threat to public health. Protection of Potable Water Supplies and Human Health Florida Administrative Code Rule 62- 660.300(1)(a)5. requires the applicant for the exemption to demonstrate that "the presently specified criteria are unnecessary" to protect potable water supplies and human health, which presupposes that the applicant has applied for an exemption from water quality criteria applicable to human health. IP has not requested such an exemption and, therefore, this particular criterion appears to be inapplicable. Even if it were applicable, the evidence does not show that the effluent would cause a problem for potable water supplies or human health. 4. Contiguous Waters Florida Administrative Code Rule 62- 660.300(1)(a)6. requires a showing that "the exemption will not interfere with the designated uses of contiguous waters." Contiguous waters, for the purpose of this criterion, would be Elevenmile Creek, Perdido Bay, and the Perdido River. Petitioners argue that Tee and Wicker Lakes should be considered contiguous waters for the purpose of this criterion of the exemption rule. However, Tee and Wicker Lakes are within the exempted wetland tract so they are not contiguous waters. Petitioners contend that IP failed to account for the buildup of detritus in the wetlands and its eventual export to Perdido Bay. Their contention is based primarily on the opinion of Dr. Kevin White, a civil engineer, that treatment wetlands must be scraped or burned to remove plant buildup. However, Dr. Nutter explained that periodic removal of plant material is needed for the relatively small "constructed wetland" treatment systems that Dr. White is familiar with, but should not be needed in the 1,464-acre wetland tract. Nevertheless, because IP did not provide reasonable assurances that the proposed permit and related authorizations would not significantly degrade the Perdido River OFW, IP failed to meet this particular exemption criterion regarding interference with contiguous waters. 5. Scientifically Valid Experimental Controls Florida Administrative Code Rule 62- 660.300(1)(a)6. requires a showing that "scientifically valid environmental controls are provided . . . to monitor the long-term effects and recycling efficiency." Petitioners' argument about this particular criterion was largely misplaced. The term "environmental controls" modifies the term "monitor" and connotes only that the experiment would be monitored in a manner that will generate reliable information about long-term effects and performance. For monitoring purposes, IP's proposed NSAI protocol is an innovative and comprehensive plan that complies with this exemption criterion. Petitioners' objections to the lack of sufficient information about Tee and Wicker Lakes is more appropriately an attack on the sufficiency of IP's showing that its discharge would not cause a significant adverse impact on the biological community within the wetland tract. That issue was discussed above. 6. Duration of the Exemption Petitioners argue that the exemption can not exceed five years in duration, but the time schedules established by the proposed Consent Order and proposed permit would allow the exemption to be in effect for nine years. The Department's exemption order states that the five years does not begin to run until IP begins to discharge effluent at D-003 into the wetland tract. The possibility that IP might seek to renew the exemption after five years does not make the exemption something other than a five-year exemption. The Department's action on the request to renew the exemption would be subject to public review and challenge by persons whose substantial interests are affected. The Waiver The proposed waiver order would excuse IP from compliance with the criteria in Florida Administrative Code Rule 62-660.300(1)(a)3. and 4., which require that public access and recreation be restricted in the area covered by the exemption for experimental use of wetlands. Without the waiver, the public would have to be excluded from Tee and Wicker Lakes. Section 120.542, Florida Statutes, requires a showing by the person seeking the waiver that the purpose of the underlying statute will be achieved by other means and the application of a rule would create a substantial hardship or would violate principles of fairness. Petitioners contend that IP failed to demonstrate substantial hardship. However, Petitioners do not want public access to Tee and Wicker Lakes restricted. The sole reason for their objection to the proposed waiver is apparently to thwart the issuance of the exemption. Section 120.542, Florida Statutes, defines "substantial hardship" as a demonstrated economic, technological, legal, or other type of hardship to the person requesting the waiver. In the proposed waiver order, the Department identifies IP's hardship as the possibility that denial of the waiver could result in denial of IP's NPDES permit and closure of the mill. The proposed waiver order then describes the number of jobs and other economic benefits of the mill that would be lost if the mill were closed. As discussed in the Conclusions of Law below, the Department's interpretation of Section 120.542, Florida Statutes, to accept a demonstration of hardship that is associated with denial of the waiver is mistaken. The statute requires that the hardship arise from the application of the rule. In this case, IP must demonstrate that it would suffer substantial hardship if it were required to restrict public access and recreation on Tee and Wicker Lakes. Petitioners claimed that IP has no authority to restrict the public from gaining access to Tee and Wicker Lakes because those are public waterbodies which the public has a right to enter and use. A substantial legal hardship for IP in complying with the exemption rule, therefore, is that compliance is impossible. The Consent Order 1. Compliance Schedule Subsections 403.088(2)(d) and (e), Florida Statutes, provide that no permit shall be issued unless a reasonable schedule for constructing, installing, or placing into operation of an approved pollution abatement facility or alternative waste disposal system is in place. Petitioners claim the time schedules for compliance are not reasonable. Petitioners presented no competent evidence, however, that the WWTP upgrades, pipeline construction, and other activities required by the proposed permit can be accomplished in a shorter period of time. One recurring theme in the Petitioners' case was that the adverse impacts associated with the continued discharge to Elevenmile Creek should not be allowed to continue, even for an interim period associated with construction of the WWTP upgrades and effluent pipeline. However, Petitioners also advocated the relocation of the discharge to the Escambia River, or to a "constructed wetlands." Both of these alternatives would have required a transition period during which the discharge to Elevenmile Creek would likely have continued. Furthermore, the Consent Order imposes interim limits on the discharge to Elevenmile Creek that would apply immediately upon issuance of the proposed permit. Although altered by the mill's effluent discharge, Elevenmile Creek is now a relatively stable biological system. The proposed permit would effectuate some improvement in the creek and Perdido Bay even during the construction phase. 2. Contingency Plan The proposed Consent Order includes a contingency plan in the event that the NSAI monitoring analysis shows adverse impacts to the biological community within the wetland tract. The plan provides for alternative responses including relocating all or part of the wetland discharge to Elevenmile Creek. Petitioners object to the plan, primarily because they contend it is vague. The provisions in the contingency plan for relocating all or part of the discharge from the wetland tract to Elevenmile Creek, appear to reflect a presumption that the negatives associated with continued discharge to the wetlands would outweigh the negatives associated with returning the discharge to Elevenmile Creek. However, it is not difficult to imagine scenarios where the harm to the biological community of the wetland tract is small in relationship to the harm to the biological community that might have reestablished itself in Elevenmile Creek. Because the selection of an alternative under the contingency plan requires the consideration of data and analyses associated with future events, it is impossible to know at this time whether future action taken by the Department and IP pursuant to the contingency plan would be reasonable. If the contingency plan is intended by the Department and IP to authorize future action when circumstances described in the plan are present, then the plan is too vague. On the other hand, there is adequate detail in the plan if the purpose of the plan is merely to establish a framework for future decision-making that would be subject to permit modification, public review and challenge. Clarification is needed. 2. Penalties Petitioners complained that the stipulated of $500 per day for violations of the proposed Consent Order is too small to provide a deterrent to a company of the size of IP. Petitioners are correct, but did not present evidence to show what size penalty would be appropriate.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Department of Environmental Protection enter a final order: Denying proposed revised NPDES Permit Number FL0002526- 001/001-IW1S; Disapproving revised Consent Order Number 04-1202; Denying IP's petition for authorization for the experimental use of wetlands; and Denying IP's petition for waiver. DONE AND ENTERED this 11th day of May, 2007, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 2007.

Florida Laws (5) 120.542120.569120.57403.088403.0885
# 6
HELEN J. CRENSHAW vs VISTA OF FORT WALTON BEACH, LLC, AND NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 12-003280 (2012)
Division of Administrative Hearings, Florida Filed:Defuniak Springs, Florida Oct. 09, 2012 Number: 12-003280 Latest Update: Apr. 12, 2013

The Issue The issue is whether Vista of Fort Walton Beach, LLC (Vista), should be issued Surface Water Management Permit No. 04-2012-0013G authorizing the construction of an earthen embankment dam and impoundment to impound stormwater runoff from a proposed commercial development in the City of DeFuniak Springs (City), Walton County, Florida.

Findings Of Fact The District has regulatory jurisdiction over the construction of certain types of impoundments within its boundaries. If an impoundment is at least ten feet high but less than 25 feet in height and has an impounding capacity of at least 50 acre-feet, a general permit is required. See Fla. Admin. Code R. 40A-4.041(1). Vista, a limited liability corporation, owns an odd- shaped parcel in the City on which it intends to build a small commercial development consisting of a 17,000-square foot building, a parking lot, and related amenities. The vacant parcel abuts the north side of U.S. Highway 90 just east of 18th Street and is approximately 1.66 acres in size. The property is partially wooded and has a small wetland area on its northeastern corner. In conjunction with the proposed commercial development, Vista intends to construct an impoundment to control stormwater runoff from the project. Because the impoundment will be ten feet high and have an impounding capacity of at least 50 acre-feet, Vista is required to obtain a general permit. See Fla. Admin. Code R. 40A-4.041(1). Vista filed a permit application with the District on June 8, 2012. On August 8, 2012, the District gave notice that it intended to issue a surface water management permit to Vista. The permit allows the construction of a stormwater retention basin. A mitigation plan for impacts to 0.23 acres of wetlands was also approved but is not at issue in this proceeding. As described in the District staff report, the project will encompass one earthen embankment dam and impoundment to impound the storm runoff. It will operate as a dry stormwater retention basin designed to impound water only during rainfall events. The facility will utilize a pipe and riser spillway system, and the basin outfall will be protected by a rip-rap lined plunge pool. Due to space restrictions, an engineered retaining wall will be incorporated into the embankment's north side slope. The stormwater will discharge through controlled overflow structures into a nearby wetland area that lies northeast of Vista's property and will then be integrated into an existing channel that eventually forms the headwaters of Sandy Creek to the north. Petitioner has resided on her property since around 1932. Her odd-shaped parcel, described as being between five and seven acres in size, lies immediately to the north of Vista's property. A small wetland is located on the southeastern corner of her property. The two parcels share a common boundary line, appearing to be no more than a hundred feet or so. Because the boundary line is lower than the highest part of each owner's property, a "trench" has formed along the line. Wabash Avenue, a platted but un-built roadway that begins on U.S. Highway 90, runs to the northwest through the wetland area and along the eastern boundaries of both properties. As alleged in the Second Amended Petition, Petitioner is concerned that the project will cause flooding on her property. In a broader sense, she appears to be opposed to any commercial development on Vista's property. The back side of the Vista parcel slopes downhill to a recessed area that is adjacent to both properties. Although some fill has already been placed on the property in preparation for the development, the applicant intends to add "a lot" more fill to the entire parcel to create a gradual slope down to the edge of Wabash Avenue. A basin or pond around 0.20 acres in size will be formed within the fill area and a retaining wall consisting of multiple segments will be constructed around the basin. The wall will be separated from Petitioner's property by a 20-foot buffer, while at its closest point the basin will be "35 feet or so" from her property line. The plans submitted by the applicant demonstrate that the system will be built in accordance with all District standards and should operate in a safe manner. Before construction can begin, the District must approve the retaining wall design specifications. During rain events, the first inch of water will be retained on site for treatment. Additional water will be stored in the basin and then slowly allowed to discharge from the basin into the wetlands. The point of discharge from the basin is at a location a minimum of 20 feet south and east of Petitioner's property line. To ensure that the retention system will not discharge runoff at a higher rate than was discharged before development, Vista performed hydrologic calculations demonstrating pre- and post-development runoff. According to accepted models developed by the United States Department of Agriculture and its predecessor, the Soil Conservation Service, the current peak runoff from the Vista property is 2.46 cubic feet per second (CFS) during a two-year, 24-hour storm event. After development, the volume of water will be reduced to 0.74 CFS. During a 25-year, 24-hour storm event, the volume of runoff post-development is anticipated to drop from 12.59 CFS to 6.51 CFS. Finally, during a 100-year, 24-hour storm event, post- development runoff will be slightly reduced from 19.64 CFS to 18.99 CFS. Therefore, as sited, sized, and designed, the project will reduce runoff during all anticipated storm events. The foregoing calculations were not credibly contradicted and satisfy the requirement that an applicant give reasonable assurance that the project will not cause an increased flow such that it will endanger downstream property in times of flood with respect to state or frequency. See Fla. Admin. Code R. 40A-4.301(2)(f). They also confirm that water in the impoundment will not be raised to a level that could be harmful to the property of others. See Fla. Admin. Code R. 40A- 4.301(2)(c). Thus, the potential for flooding on Petitioner's property will be reduced if the project is constructed as permitted. The Department of Transportation (DOT) is currently repairing the drainage system on U.S. Highway 90 in front of the Vista property. Stormwater from that project drains into the wetlands through an easement deeded to the City at the rear of the Vista property. Petitioner pointed out that after the DOT project began, and fill was added to the Vista property, she has experienced an increase in water on her property. Whether the DOT project is responsible in any way for this hydrologic change is not known. However, accepted testimony by two professional engineers supports a finding that Vista is not responsible for any hydrologic changes on Petitioner's property. Vista was not required to take into account any runoff from the DOT project in making its hydrologic calculations because the amount of runoff from its own property will actually be reduced by the retention system. At hearing, Petitioner contended that a fence she built on the common boundary line with Vista sometime after 1990 was illegally removed by Vista in order to construct the basin. According to Mr. George, who first surveyed the property line in 1990 and then surveyed it a second time a few years ago, the fence was built a few feet beyond Petitioner's property line and lies within the buffer zone between the basin and her property. Petitioner argues that even if this is true, the doctrine of adverse possession applies and she is now the owner of the property on which the fence was built. This type of dispute, however, can only be resolved in circuit court, and not in an administrative forum. See § 26.012(2)(g), Fla. Stat. The District has examined the property records and is satisfied that Vista has ownership of the property on which the impoundment will be built. Notably, the basin will not be located within the 20-foot buffer where the fence once stood and which is dedicated to the City as an easement. Finally, through cross-examination at hearing, Petitioner suggested that any project designed by humans carries with it the remote possibility that it will fail and create a catastrophic situation on her property. In the unlikely event that the design and operation of the retention basin threaten the safety of adjoining property owners, section 373.429 and rule 40A-1.205 enable the District to revoke, suspend, or modify a permit to protect the safety of others.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Northwest Florida Water Management District enter a final order approving the issuance of Surface Water Management System Permit No. 04-2012-0013G to Vista. DONE AND ENTERED this 11th day of March, 2013, in Tallahassee, Leon County, Florida. S D. R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of March, 2013. COPIES FURNISHED: Jonathon Steverson, Executive Director Northwest Florida Water Management District 152 Water Management Drive Havana, Florida 32333-4712 Helen J. Crenshaw 61 North 18th Street DeFuniak Springs, Florida 32433-9547 Kevin X. Crowley, Esquire Pennington, Moore, Wilkinson, Bell & Dunbar, P.A. Post Office Box 10095 Tallahassee, Florida 32302-2095 James Busby Vista of Fort Walton Beach, LLC Post Office Box 760 Fort Walton Beach, Florida 32549-0760

Florida Laws (4) 120.5726.012373.42995.16
# 7
ALAN S. DORRILL vs ROBERT LAVEN, JOHN CLOUD, AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-003988 (1991)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Jun. 25, 1991 Number: 91-003988 Latest Update: Dec. 16, 1991

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: Respondent Laven owns a parcel of land at 1500 Bay View Drive, Sarasota, Florida on which he has a home. The property is approximately 180 feet by 100 feet, and is located on Sarasota Bay. A seawall has been constructed along the shoreline. Respondent Cloud owns a parcel of land at 2610 Cardinal Lane, Sarasota, Florida that is contiguous to Respondent Laven's property at 1500 Bay View Drive, Sarasota, Florida that is also located on Sarasota Bay. Approximately 100 feet of the property is located along the shoreline of Sarasota Bay. Sarasota Bay is currently designated as a Class III outstanding Florida waterbody. On or about June 28, 1991 Respondents Laven/Cloud filed an application to modify existing permit number 581885033 which had been previously issued to Respondent Laven for construction of a private dock consisting of an access pier 210 feet by 5 feet, with a terminal platform 20 feet by 4 feet on Laven's property located at 1500 Bay View Drive, Sarasota, Florida. Previous to the modified application being filed by Laven and Cloud, Laven had attempted to modify permit no. 581885033 by reducing the access pier from 210 feet by 5 feet to 175 feet by 5 feet. The Department concluded that the dock, as modified, would not reach water of sufficient depth to prevent damage to the seagrass, and considered this a major modification requiring a new application. Therefore, the Department denied the modified application, and Respondent Laven did not file a new application. The application filed by Laven/Cloud on or about June 28, 1991 to modify existing permit 581885033 proposed to construct a private dock on the property line between Laven's and Cloud's property. The private dock was proposed to consist of an access pier 4 feet by 210 feet, with two terminal platforms, each 25 feet by 6 feet. After review of the application to modify permit 58188503 the Department issued a Notice of Intent to issue a permit for the proposed construction of the private dock on August 2, 1991. The Notice of Intent included 18 specific conditions to which the proposed dock would be subject. Those relevant to this proceeding are as follows: 1) . . . . If historical or archaeological artifacts, such as Indian canoes, are discovered at any time within the project site the permittee shall immediately notify the district office and the Bureau of Historic Preservation, Division of Archives, History and Records Management, R.A. Gray Building, Tallahassee, Florida 32301. Turbidity screens shall be utilized, secured, and properly maintained during the permitted construction and shall remain in place until any generated turbidity subsides. Double turbidity screens, staked hay bales, staged construction and other additional measures shall be used as necessary to insure compliance with water quality standards in Chapter 17-3, Florida Administrative Code. During construction, all areas of exposed soils shall be effectively isolated from waters of the state to prevent erosion or deposition. All exposed soils shall be stabilized with an appropriate ground cover within 72 hours of attaining final grade. 5) . . . . 6) . . . . The applicant is not permitted to conduct or construct the following activities or facilities in conjunction with this dock structure: Fish cleaning facilities. Fuel hoses or fueling facilities. The mooring of boats or vessels for live aboards. The mooring of boats utilized for com- mercial purposes such as fishing, scuba diving, boat rental, etc. Picnic tables or benches. Storage sheds or enclosed structures. Covered boat slips. Sanitary facilities. The rental of boat slips or mooring space. Turbidity screens shall effectively encom- pass each piling during installation and remain in place until any generated turbidity has subsided. Turbidity screens shall effectively encompass an area around each piling not to exceed 7 square feet. Any watercraft which may be utilized during construction activities shall only operate/moor in waters of sufficient depth so as not to cause bottom scour or prop dredging. The access pier shall be elevated a minimum of 5 feet above mean high water for the most waterward 150 linear feet of the access pier. The most waterward 150 linear feet of the access pier shall be constructed with the slated[sic] design indicated on sheet 4 of permit submittals. The most landward 60 feet of the access pier shall be constructed utilizing the 2 x 6 decking. The permittees shall construct 100 linear feet of rip rap along the existing vertical seawall as indicated on sheet 1 of permit submittals. Rip rap material shall consist of natural boulders or clean concrete rubble six inches to three feet in diameter or in average dimensions. The slope of the rip rap shall be no steeper than 2H:1V. There shall be no reinforcing rods or other similar protrusions in concrete rubble and all rubble or boulders shall be free of attached sediments. The rip rap shall be install concurrently with the construction of the permitted dock. The permittees shall grant the Department a conservation easement over the shorelines of the two subject parcels. A conservation easement shall be established over the seawall cap and 2 feet waterward of the seawall for the entire length of the seawall to 1500 Bay View Drive (Lots 1, 2, 3, 4, 11, 12, 13, and 14 Block Q, Bay View Heights Addition). A conservation easement shall also be established between the limits of the mean high water linear and the landward extent of waters of the State (Pursuant to Section 170301.400[sic] FAC) for the entire length of the shoreline at 2610 Cardinal Place (Lots 5, 6, 7, 8, 15, 16, 17 and 18, Block Q, Bay View Heights Addition). 14) . . . . 15) . . . . The following seagrass monitoring program shall be implemented and adhered to: Within 45 days of the issuance of this permit (and prior to initiation of dock con- struction) the permittee shall establish a preconstruction monitoring program consisting of one meter square grids within the area specified on sheet 1 A of permit attachments. A minimum of 10 random one meter square plots shall be selected within each area A and B and also along the centerline established along the length of the dock. The permittee shall measure percent areal coverage of seagrasses within each plot within the grid system. Each of the plots shall be monitored as specified in above a minimum of two times per year (July and January) over a three year monitoring period subsequent to dock construction. Reports shall include date, water depth, water clarity, species of seagrasses observed, percent areal coverage and representative height of seagrasses within each plot. Moni- toring reports shall be submitted to the Department within 30 days of the monitoring event. The first monitoring event shall occur during the first January or July (which ever occurs first) subsequent to completion of dock construction. Hand railing shall be constructed along the entire length of the access pier (on both sides). The temporary or permanent mooring of watercraft shall only occur at the terminal platform. 18) . . . . By imposing special conditions 3, 4, 8 and 9 it will ensure that the dock construction will have a temporary minimal impact on the water quality, and there will be no permanent water quality impacts as a result of this project. If this permit is not issued, it would be possible for each of the applicants to build an exempt dock on his property which would require two accesses or swaths through the seagrass beds. An exempt dock (500 square feet or less) may result in the dock terminating in seagrass beds and in water of insufficient depth to prevent damage to the seagrass beds or to prevent bottom scour or propeller dredging. The project site consists of a shoreline with a shoal area where Shoal grass (Halodule wrightii) and Turtle grass (Thalassia sp.) are growing, with the Turtle grass being the predominant species to a point further waterward to where there is a significant change in the water depth. Such point being approximately at the termination of the proposed dock. Beyond this point the seagrass beds are scattered. Therefore, any dock shorter than approximately 210 feet would terminate in the main seagrass beds and result in the seagrass beds being routinely disrupted or damaged by power boats. The proposed design of the most waterward 150 linear feet of the deck portion of the proposed dock has less solid surface than a normal deck, and, along with the proposed height of the most waterward 150 linear feet of the proposed dock, would allow substantially more light to penetrate the area and provide sufficient light for healthy existence of the seagrasses. The proposed impacts consists of disturbance of the seagrass beds. Requiring railing along the entire access pier on both sides will preclude mooring of motor craft in the area of the seagrass and in water depths insufficient to prevent damage to the seagrass, and to prevent bottom souring and propeller dredging. Because of the length, height and design of the dock there would be minimal impact, if any, on the seagrass beds. The design of the dock will ensure that the project will not adversely affect the functions being performed in the area intended for the dock. The conservation easement will ensure that a feeding ground for wading birds will be maintained, and along with the dock design will minimize any impacts that the proposed dock will have on the fish and wild life habitats. The construction of the 100 linear feet of rip rap along the existing vertical seawall on Sarasota Bay along Laven's property will reduce scouring and erosion at the base of the seawall, and provide beneficial habitat which will be an improvement of the seawall alone. There may be minimal impacts on recreation in that it may impose some inconvenience for those fishing and those attempting to access the bay for sailing. There may be some minimal impact on navigation in that the proposed dock will entend out approximately 35 feet further than any other existing dock in the area but due to the shallow water in this area boats presently have to travel at a reduced rate of speed, and for this reason the proposed dock would not adversely affect navigation. However, this should be mitigated by requiring lights on the dock as a safety feature. The project will not adversely affect the fishing, or recreational values, or marine productivity in the vicinity of the project. The proposed project will not adversely affect the public health, safety, or welfare or property of others. The proposed dock will be a permanent structure, notwithstanding that regular mainentaince will be required. The Respondents Laven/Cloud have provided reasonable assurances that the proposed project will be clearly in the public interest, notwithstanding the minimal impact it may have on recreation and navigation. Particularly, when all Special Conditions are considered, specifically Special Conditions 12 and 13 pertaining to rip rap along the vertical seawall on Laven's propertry and the granting of the Conservation Easement over both Laven's and Cloud's shoreline.

Recommendation Accordingly, in view of the above Findings of Fact and Conclusions of Law, it is, therefore, recommended that the Department enter a Final Order issuing Permit Number 581885033 to Respondents Robert Laven and John Cloud as set forth in the Department's Intent To Issue dated August 2, 1991 provided that the grant of the subject permit should include the general and specific conditions in the Intent To Issue as well as the condition requiring lights on the dock for safety purposes as set forth in Finding of Fact 20 above. RECOMMENDED this 21st day of November, 1991, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of November, 1991. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-3988 The following constitutes my specific rulings pursuant to Section 120- 59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties in the case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Both paragraphs regarding Respondent Cloud's testimony at the hearing go to his credibility as a witness and are not stated as a finding of fact and are therefore rejected. Paragraphs 1 and 2 regarding Rose Poynor's testimony appear to be supported by documents or testimony not received at the hearing and are therefore rejected. Paragraph 3 regarding Rose Poynor's testimony is either immaterial or irrelevant or goes to her credibility as a witness or is supported by facts not in the record. The paragraph regarding Roy R. Lewis' testimony goes to his credibility as a witness and is not a statement of fact. Paragraphs 1 and 2 regarding Robert Patten's testimony is more of a restatement of his testimony than a finding of fact. But in any event, are neither material or relevant. The next to the last paragraph is not supported by the record but see Finding of Fact 20. The last unnumbered paragraph is not supported by the record. See Finding of Fact 24. Rulings on Proposed Findings of Fact Submitted by Respondent Department of Environmental Regulation 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which adopts the proposed findings of fact: 1 (1, 2, 3); 2 (4, 6); 3 (5); 4 (11); 5 (11); 6 (13); 7 (7, 8); 8 (7, 8); 9 (7, 8); 10 (7, 8); 11 (7); 12 (7); 13 (12, 15); 14 (7); 15 (12); 16 (7, 14); 17 (15); 18 (7, 16); 19 (17); 20 (7); 21 (7); 22 (7, 18); 23 (18); 24 (20); 25 (7, 17); 26 (23); 27 (19); 28 (21); 29 (22); 30 (7); 31 (17); 32 (7); 33 (9); 34 (9, 10); 35 (7, 8, 11, 12, 14-22); and 36 (7). Rulings on Proposed Findings of Fact Submitted by Respondents Laven and Cloud Respondents Laven and Cloud have divided their findings into two groups (1) Findings of Fact and (2) Ultimate Findings. Since the Findings of Fact are duplicative of the Ultimate Facts or are only restatements of the witnesses testimony, I will respond only to the Ultimate Facts. 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which adopts the proposed finding of fact: 1 (1); 2 (3); 3 (2); 4 (4, 6); 5 (3); 6 (7, 12); 7 (7, 17, 18); 8 (7); 9 (7); 10 (7, 24); 11 (7, 24); 12 (22); 13 (17); 14 (is a duplication of paragraph 13); 15 (20); 16 (21) and 17 (16). COPIES FURNISHED: Alan S. Dorrill 1726 Floyd Street Sarasota, FL 34239 F. Craig Richardson, Esquire Icard, Merrill, Cullen, Timm, Furen, & Ginsbrug, P.A. 2033 Main Street, Suite 600 Sarasota, FL 34237 Carol Forthman, Esquire Maureen A. Eggert, Certified Legal Intern 2600 Blairstone Road Tallahassee, FL 32399-2400 Carol Browner, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (1) 120.57
# 8
UNIVERSITY HIGH EQUITY REAL ESTATE FUND II, LTD. vs. CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 86-001724 (1986)
Division of Administrative Hearings, Florida Number: 86-001724 Latest Update: Aug. 18, 1986

Findings Of Fact On or about March 7, 1986, Petitioner submitted an application for a variance from the open space and rear set-back line requirements applicable to property located at 2612 U.S. 19 North, Clearwater, Florida. The subject property is zoned CC (commercial center). Petitioner's application requests a variance to provide 12.33% open space instead of 25%, and to construct a building 30 feet from the rear property line rather than 50 feet as required by the Land Development Code for property zoned CC. On or about April 24, 1986, the Development Code Adjustment Board denied Petitioner's application for a variance, and Petitioner timely appealed on May 6, 1986. The only evidence in support of its application offered by Petitioner was the testimony of Robby Tompkins. He testified that Petitioner's application is "unique" because Petitioner was 90% complete with its architectural plans for the renovation and modernization of the subject property when the current ordinance took effect, and Petitioner therefore urges that the current ordinance should not apply. Additionally, Petitioner argues that there will be no injury to the public as a result of the variance, and in fact the project will add 6800 square feet to its shopping center. Tompkins admitted that an increase in financial return was the primary reason Petitioner has sought the variance. Finally, he stated that if Petitioner complies with the 25% open space requirement, there will not be enough parking to meet Code provisions, and if sufficient parking is provided, there will not 25% open space.

Florida Laws (1) 120.65
# 9
NICHOLAS M. ZEMBILLAS AND WALTER L. STARZAK vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 84-001979 (1984)
Division of Administrative Hearings, Florida Number: 84-001979 Latest Update: May 24, 1985

Findings Of Fact Petitioners filed separate, although virtually identical, applications with the Department in February, 1983 to construct separate catwalks from their properties, with platforms at the end of each catwalk. The dimensions of each catwalk were to be three feet by 350 feet, and the platform dimensions were to be six feet by twelve feet. This construction was to take place through a marsh and mangrove wetland and tidal creek known as Andrews Creek. Petitioner's properties adjoin and are in the interior of the creek. Intervenor's property is located at the mouth of Andrews Creek where it intersects a canal, and borders that area of the creek through which Petitioners proposed to construct their catwalks and platforms. On March 9, 1983 the Department notified Petitioners that a permit would be required for their project pursuant to Chapters 253 and 403, F.S., that their applications were incomplete, and that approval from the Department of Natural Resources in the form of a "consent of use of state-owned land" might be required. Petitioners provided additional information in support of their application, but were again notified on April 5, 1983 that Department of Natural Resources consent or approval was necessary in order to complete their application file. The Department prepared a permit application appraisal report on June 13, 1983 without the benefit of an on-site inspection for these applications. The appraisal was based upon written materials submitted by Petitioners in their applications. The appraisal recommended approval, noting that a single joint access facility would be preferable to the dual catwalk and platform configuration proposed by Petitioners As a result of this appraisal, the Department notified the Department of Natural Resources on July 1, 1983 that it intended to issue permits to the Petitioners but that it needed a response from the Department of Natural Resources concerning consent of use or approval pursuant to Section 253.77, F.S. Final action on Petitioners' applications could not take place until the Department received a reply from the Department of Natural Resources. Petitioners received a copy of this notice which was sent from the Department to the Department of Natural Resources. Petitioner was again notified on August 29, 1983 that consent or approval from the Department of Natural Resources was required before the Department's approval could be given. The August 29 letter also stated that Petitioners would have to obtain a letter of authorization and affidavit of ownership from any property owner, other than Petitioners themselves, whose property would be crossed by their construction. In response, Petitioners submitted to the Department an approval they received from the local homeowner's association, but this approval was not issued in compliance with the association's by-laws, and was therefore not a valid authorization and consent to the use of whatever interest the association has in Andrews Creek. On December 5, 1933 Petitioners notified the Department that they were amending their applications to eliminate the platforms at the end of their respective catwalks. On or about January 3, 1984 the Department of Natural Resources suggested to the Department that public notice of this project be given due to the type and location of the project. The Department notified Petitioners on January 26, 1984 that since numerous property owners might be affected by their project, a public notice would have to be published. In response to such publication, the Department received letters from other property owners on Andrews Creek which both opposed and supported Petitioners' project. At about the same time, the Department learned that Petitioners had already constructed their catwalks, with one large platform joining the ends of both catwalks. This construction took place despite the lack of either a permit from the Department or consent/approval from the Department of Natural Resources. Petitioners' applications indicate the use of six inch pilings and a portable jet pump with a one inch jet nozzle in the construction of their project. The Department performed a field inspection of the site and issued a permit application appraisal report dated May 3, 1984 which recommended denial of the permit applications while also confirming that the project had already been constructed. Denial was recommended since the dimensions of the actual construction exceeded the project dimensions described in the applications, considerable clearing of mangroves had taken place although the applications stated no such clearing would be required, and the adverse impact on water quality, marine productivity and other environmental factors the two catwalks were found to terminate with a large platform thirty-eight feet long by ten feet wide, with Zembillas' catwalk being 417.5 feet in length and Starzak's being 398 feet long. The combined project has a total square footage of approximately 3700 square feet, with each catwalk exceeding the permit exemption dimensions of 1000 square feet. Andrews Creek has been designated a conservation area and therefore the clearing and resulting damage to the mangrove community resulting from this project is particularly significant. As part of a permitting action in 1972 the State of Florida, through he Board of Trustees of the Internal Improvement Trust Fund, negotiated with Lindrick Corporation, the developer of the residential area surrounding Andrews Creek, to preserve certain areas from development. The Board of Trustees issued a permit to Lindrick Corporation "to perform certain works in the navigable waters of the State of Florida" which allowed half of Andrews Creek to be filled and which preserved the other half that remains today as a conservation area. The conservation area was to be protected from development. Thereafter, the Lindrick Corporation entered into an agreement with the homeowner's association whereby association approval would be required for development in the conservation area. Petitioners' project, as constructed, shades a larger area than it would have if built in accordance with their applications. Shading of wetlands can reduce dissolved oxygen levels of a wetland and thereby reduce the area's productivity. Although Petitioners offered a laboratory report showing exceedingly high dissolved oxygen levels in Andrews Creek, it appears that the sampling technique used resulted in the aeration of the sample which therefore did not reflect the true level of dissolved oxygen. Intervenor testified that he purchased his property because of the designation of Andrews Creek as a conservation area, and the resulting privacy of such a natural habitat. Petitioners' construction has obstructed Intervenor's view of the water and wetlands area of Andrews Creek, and infringes on this privacy due to the close proximity of Petitioners' platform to Intervenor's property. The catwalk is twelve to fourteen feet from the boundary of Intervenor's property. The portion of Andrews Creek crossed by Petitioners' project is navigable according to testimony presented, and as recognized in 1972 when a dredging permit was issued to the developer, Lindrick Corporation. The portion in question includes the original tidal creek, which is a tributary of the Gulf of Mexico via an excavated channel. Navigability of the creek has been adversely affected by this project. There would be a significant, adverse, cumulative effect on Andrews Creek if other surrounding property owners decided to construct docks similar to Petitioners' since this would involve additional clearing of mangroves, a reduction of dissolved oxygen in the water due to extensive shading, and the further elimination of the creek's navigability. There are eighteen (18) property owners on Andrews Creek, including Petitioners and the Intervenor, and there is a reasonable likelihood that other homeowners will apply for permits to construct similar docks.

Recommendation Based upon the foregoing findings of fact and conclusions of law it is recommended that: Petitioners permit applications be DENIED. Petitioners shall have forty-five (45) days from rendition of the Final Order in this case to remove their dock, consisting of catwalks, a connecting platform and support pilings. DONE and ENTERED this 1st day of April, 1985 at Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of April, 1987. COPIES FURNISHED: Charles G. Stephens, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Nicholas M. Zembillas 2001 Dewey Drive New Port Richey, Florida 33552 Martha Harrell Hall Esquire Post Office Drawer 190 Tallahassee, Florida 32301 W. L. Starzak 2003 Dewey Drive New Port Richey, Florida 33552 Victoria J. Tschinkel, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57253.77403.161403.813