Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
JAMES L. SMITH vs DEPARTMENT OF HEALTH, 05-004131 (2005)
Division of Administrative Hearings, Florida Filed:Jacksonville, Florida Nov. 14, 2005 Number: 05-004131 Latest Update: May 04, 2006

The Issue The issue to be resolved in this proceeding concerns whether the Petitioner violated Florida Administrative Code Rules 64E-6.022(1)(b)2, 64E-6.022(1)(d), and 64E-6.022(1)(p) by making repairs to an on-site sewage disposal system without a permit, and by missing required inspections of the system, as outlined in the citation issued by the Respondent Agency dated August 29, 2005.

Findings Of Fact The State of Florida, Department of Health and Duval County Health Department (Department) is an Agency of the State of Florida, charged with enforcing the statutory and regulatory provisions regarding septic tank and drain field installations and repairs, in Florida, in accordance with Section 381.0065, Florida Statutes, and Florida Administrative Code Rule Chapter 64E-6. The Petitioner is the qualifying registered septic tank contractor for All Florida Septic Tank Service, Inc. (All Florida). He holds registration number SR00011389. He has 15 years of experience in the field of septic tank system construction and repair. All repairs of on-site sewage treatment and disposal systems (septic systems), are required to be performed under the supervision and control of a registered septic tank contractor. Mr. David Adeeb is president of United Properties of North Florida, Inc. He owned property (a residence) at 375 North Cahoon Road, in Duval County Florida. He was informed by his tenants at that residence that the septic tank and drain field were malfunctioning and needed to be repaired or replaced, sometime in April 2004. He therefore contacted All Florida, asking them to inspect the septic system at that residence and advise what repairs might be needed. He was advised by some representative of All Florida that the drain field needed to be replaced and was quoted a price of $2,000.00. All Florida requested that payment be made before the work was performed. Since Mr. Adeeb was out-of-town at the time he asked his tenant to temporarily pay All Florida for the cost of the repairs and/or installation, which they agreed to do. All Florida then issued a contract/proposal to United Properties on April 12, 2004. It was signed by a representative of All Florida, Michael Carver. Mr. Carver was an employee of All Florida. The contract/proposal indicated that a 360 square foot drain field would be installed at 375 Cahoon Road, for a price of $2,000.00, to be paid in cash. The contract/proposal was on All Florida letterhead and included a warranty. Mr. Adeeb was told by his tenant that the Petitioner, who is personally known to that tenant, was on the property while the work was being performed. No one applied for a permit to make any repairs to the septic system and the work was completed without a permit being obtained. Some five months later the system began leaking sewage from the new drain field. It had malfunctioned. Mr. Adeeb therefore again called All Florida to demand that they repair any malfunctions pursuant to the warranty. All Florida informed Mr. Adeeb that a new drain field with a mounded system and pump was needed. When Mr. Adeeb told a representative of All Florida that they had just replaced the drain field in April of that year, he was told that another $2,000.00 would be required to correct the drain field problem. Mr. Adeeb had just recently entered into a contract to sell the property at 375 Cahoon Road so, time being of the essence in closing the sale of the property, he felt he had no choice but to ask All Florida to go ahead with the repair work on the system which All Florida had been asked by him to repair five months previously in April of 2004. After the new system was installed Mr. Adeeb found that a permit had never been obtained for the first drain field work which he had requested from All Florida and that All Florida had done the work incorrectly. Mr. Adeeb objected to paying another $2,000.00 for the second repair job, performed in approximately September of 2004 and after much discussion with All Florida's representatives agreed to pay $1,000.00 dollars for the second stint of repair work. He made the payment and he received a warranty from All Florida for one year, good through September 22, 2005. The warranty was signed by Mr. Wayne Joyner, operations manager for All Florida. Mr. Joyner is also the qualifying registered septic tank contractor for AA Septic Tank Service, Inc., apparently a second corporation domiciled at the same facility and address as All Florida Septic Service, Inc. In May of 2005 Mr. Adeeb was again contacted by the now former tenant who had purchased the property from Mr. Adeeb. He was thus informed that the system had failed again and sewage was leaking onto the surface of the property from the drain field. Mr. Adeeb again contacted All Florida on May 23, 2005. A representative of All Florida informed him that he should fax a copy of the paid receipt and the warranty to them and that they would take care of the problem. On June 20, 2005, the home owner again contacted Mr. Adeeb and told him that no one from All Florida had repaired the drain field as yet. A faxed copy of the paid receipt and warranty was requested once again by All Florida. After numerous phone calls with representatives of All Florida, Mr. Adeeb was told that the problem was not due to All Florida's repair work and that Mr. Adeeb would need to get someone else to repair the system. The Petitioner, James L. Smith, the registered qualifying septic tank contractor for All Florida, testified that Michael Carver had performed the initial repair job in April of 2004 for Mr. Adeeb without the knowledge of the Petitioner or All Florida. He claims that Michael Carver never worked for All Florida. He introduced into evidence a letter purported to be from Michael Carver which was dated September 30, 2005, but signed on October 5, 2005. That letter states that Mr. Carver performed the first drain field repair job without the knowledge of All Florida and that he had created the receipt form which was apparently given to either the tenants at the residence in question, or to Mr. Adeeb, on All Florida letterhead without the knowledge of any officer, employee, or representative of All Florida. That letter, however, was not authenticated because Mr. Carver was not present at the hearing and could not be examined concerning it, or the details of Mr. Carver's involvement with the initial repair project. Moreover, the Petitioner was unable to explain how Mr. Carver would have known about the job at all if he had never worked for All Florida. This is because Mr. Adeeb established that in obtaining all of the repair work during 2004-2005 he had only contacted representatives of All Florida. He had never had contact with Mr. Carver. The Petitioner denied ever telling counsel for the Department in a telephone conversation that Michael Carver had worked for him during the week (i.e. All Florida) but that he let Mr. Carver do "side jobs" on his own on weekends. He claimed that Mr. Carver did the job in question in April of 2004 because the tenants knew him personally and arranged for him to do the work. The testimony of Mr. Adeeb and the Department's evidence in the form of its composite exhibit, is accepted as more credible than the self-serving testimony of the Petitioner, and it is found that All Florida and the Petitioner were responsible for the repair jobs at issue in this case because Mr. Adeeb contracted with All Florida for the work in question. Even if the initial job was performed by Mr. Carver, it is determined that he did so as employee or agent of All Florida and the Petitioner. Under the authority cited herein the Petitioner was responsible, as the qualifying, registered septic system contractor for All Florida, with performance and supervision of the work in question.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is, therefore, RECOMMENDED that a final order be entered by the Respondent Department finding that the violations charged have been established and that a fine of $2,500.00 dollars be imposed for the violations. DONE AND ENTERED this 30th day of March, 2006, in Tallahassee, Leon County, Florida. S P. MICHAEL RUFF Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with Clerk of the Division of Administrative Hearings this 30th day of March, 2006. COPIES FURNISHED: James L. Smith 8300 West Beaver Street Jacksonville, Florida 32220 Catherine R. Berry, Esquire Department of Health 515 West Sixth Street Jacksonville, Florida 32206-4311 R. S. Power, Agency Clerk Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701 Timothy M. Cerio, General Counsel Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701

Florida Laws (4) 120.569120.57381.0065381.00655
# 1
BEN F. WARD, JR., AND E. L. C. PARTNERSHIP vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-003541 (1987)
Division of Administrative Hearings, Florida Number: 87-003541 Latest Update: Feb. 18, 1988

The Issue Whether a septic tank permit, should be granted for lot 2, Whispering Oaks Subdivision. More specifically, does the' requirement of no more than four lots per acre require a minimum lot size of 1/4 acre? In the alternative, must the subject lot be grouped with three contiguous lots to determine whether the density requirement is met? If a permit should be denied, is a variance appropriate under HRS' rules and the circumstances of the case?

Findings Of Fact The essential facts in this case are uncontroverted. Ben F. Ward is the President and sole stockholder of Ben Ward, Incorporated. His business for over eighteen years has been real estate, construction and development. He has built over 300 homes and is familiar with the procedures for developing a subdivision, including obtaining septic tank permits. In 1979, Ben Ward purchased the property now designated Whispering Oaks Subdivision, located in the City of Oviedo, Seminole County, Florida. The property contains approximately six acres, net. That is, the paved right of ways have been disregarded. There are no streams, lakes or other bodies of surface water on the property. Ward subdivided his property into 26 lots, two of which, lots number 12 and 17, are dedicated for recreational use and will not have homes. Some of the lots are less than 1/4 acre; others are more. Lot number 2 has 9,137 square feet, 1,753 square feet less than 1/4 acre. As a condition of plat approval, the City of Oviedo required Ward to obtain approval from the Seminole County Health Department. Val Roberts was the county health officer with whom Ward consulted. A process was devised for "borrowing" acreage from lots of over 1/4 acre to meet the minimum requirements for lots less than 1/4 acre. In other words, it was determined that the total net acreage in the subdivision would be considered in computing the four lots per acre minimum. The plat was approved and was recorded in 1980. Between 1981 and 1987, 19 residences were built and septic tank permits were obtained. There is city water service in the subdivision. In 1985, Ward sold 16 lots to the Erie Land Company, a partnership comprised of Mary Ellen Hines and her husband. In reliance on the arrangement worked out with the health department, Ward assured ELC that the lots were buildable. He remained trustee of the property. On February 26, 1987, the Seminole County Health Department (HRS) denied Ward's application for a septic tank permit for lot number 2, including a 3-bedroom, 2-1/2-bath home, comprising 2100 square feet. The denial letter cites rule 10D-6.46(7)(b), F.A.C., and says "Four lots grouped together lack approximately 3000 square feet of meeting the required lot size...". The letter provides the procedure for petition for a variance to Rule 10D-6, F.A.C. Ward applied for the variance, and its approval was recommended by a vote of 3-2 by the HRS Review Group for Individual Sewage Disposal. The recommendation was denied by the HRS State Health Officer, E. Charlton Prather, M.D. in a letter dated May 7, 1987 which states, in pertinent part: Grouping of lots to determine whether the subdivision meets the four lot per acre requirement must be done in a logical manner to maximize the homogenous dissemination of sewage effluent or prevent a concentration of sewage effluent in a small or limited area. Once a specific area is utilized in calculating sewage flow dispersal for a group of lots, that area cannot be further used for another lot or group of lots. Lot number 2 meets all requirements of HRS for septic tanks, with the exception of the density methodology. Ward surveyed the homes built and occupied for approximately a year and found that the subdivision as a whole is about 60% of allowable capacity. Ms. Haynes has lived on lot number 22 for six years and has never had septic tank problems. She holds an inactive real estate license, and before purchasing the property found the subdivision high and dry and well-developed.

Recommendation Based on the foregoing, it is, hereby RECOMMENDED: That the application for septic tank permit for lot 2, Whispering Oaks subdivision, be GRANTED. DONE and RECOMMENDED this 18th day of February, 1988, in Tallahassee, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 18th day of February, 1988. COPIES FURNISHED: Ben F. Ward, Jr. Ben Ward Agency, Inc. P. O. Box 670 Oviedo, Florida 32765 John A. Baldwin, Esquire Baldwin & Baum 7100 S. Highway 17-92 Fern Park, Florida 32730 James A. Sawyer, Jr., Esquire HRS District 7 Legal Counsel 400 W. Robinson St., Suite 911 Orlando, Florida 32801 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Suite 407 Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Miller, Esquire Acting General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (1) 120.57
# 2
JAMES L. SMITH vs DEPARTMENT OF HEALTH, 05-004354 (2005)
Division of Administrative Hearings, Florida Filed:Jacksonville, Florida Nov. 29, 2005 Number: 05-004354 Latest Update: Jun. 29, 2006

The Issue The issue is whether Petitioner created a sanitary nuisance in violation of Florida Administrative Code Rule 64E- 6.022(1)(d)(l) and (q) and, if so, the proper penalty.

Findings Of Fact The Department of Health, Duval County Health Department (Department), is the agency charged with enforcing the statutory and regulatory provisions pertaining to septic tank installations and repairs in Florida, pursuant to Section 381.0065, Florida Statutes, and Florida Administrative Code Chapter 64E-6. Mr. Smith is a qualified contractor employed by All Florida Septic Tank Service, Inc. (All Florida). The citation issued on April 15, 2004, identifies Mr. Smith's registration number as SR0011389 and All Florida's registration number as SA0000956. The citation describes the alleged violations as follows: On March 8, 2004, a repair application was submitted to the Duval County Health Department (DCHD) for 8817 & 8821 Bellrose Avenue, Jacksonville, FL 32244. All Florida Septic Tank Service, Inc. was indicated as the agent for the applicant/property owner, Ben Lewis. On April 8, 2004, Robert Hoag, qualifying contractor for Plumbing and Contracting by Hoag, disconnected the stub out line running from the house to the existing septic tank prior to installation of new septic tanks thus creating a sanitary nuisance. The existing septic tanks were abandoned at said property by All Florida Septic Tank Service, Inc.; DCHD was not notified of tank abandonment as required for inspection. Water supply was not turned off during he time of construction. On April 9, 2004, Colleen Bierbach, DCHD inspector, observed and photographed prima facie evidence of untreated human waste discharge onto ground surface at 8817 & 8821 Bellrose Avenue. Mr. Smith accepted the citation on April 15, 2004. On the same date, Mr. Smith wrote a letter to Scott Turner of the Department of Health, in response to the citation. His letter reads as follows: Mr Scott Turner, On April 8, 2004 All Florida Septic Tank Service Inc. started a job at 8817 and 8821 Bellrose Avenue in which new tanks and drainfields were required. In order for the new drainfield to be installed the existing tank had to be abandon [sic] prior to any work being done. The two existing referenced tanks were properly pumped out an abandoned on April 8, 2004. The new septic tanks were scheduled to be installed that same day. Due to mechanical problems with the crane truck, the tanks were unable to be set that day, causing the contracted plumber, Robert Hoag, to be unable to tie in the new sewer line. On the following day April 9, 2004 tanks (1500 gallon septic tank) and (750 gallon dosing tank) were installed with a different truck. At that time the contracted plumber was onsite to immediately tie in the sewer line. In the mean time the Duval County Health Department came to do the required inspection of the new system, at which time Colleen Bierback of the Health Department observed a small amount of sewage on the ground and photographed the site. Mr. Hoag immediately tied the sewer in at the same time, fixing the sanitary nuisance within one hour after inspection. According to Mr. Smith, sanitary problems existed at this work site for months. That is, raw sewage had been coming out of the old septic system for a long time. In Mr. Smith's words, "I was there to fix the sanitary nuisance, not create it." The owner of the property in question engaged Mr. Hoag, of Plumbing and Contracting by Hoag, to accomplish the plumbing portion of the operation. While Mr. Smith's letter stated that the new septic tanks were actually installed on April 9, 2004, Mr. Smith testified at hearing that he performed excavation services, installed a new drainfield and set the new septic tanks on April 8, 2004. The sand and new drainfield had to be put in first and the new tanks installed last. The plumber, Mr. Hoag, would be responsible to make the necessary pipe connection on the new tanks. However, Mr. Hoag did not make the necessary pipe connection and the occupants of the residences used the facilities between April 8, 2004, and April 9, 2004. Mr. Smith did not call anyone to inspect the old septic tank upon abandonment. According to Mr. Smith, it is common practice in the Jacksonville area to not call for an "abandonment" inspection when the contractor has a permit to install a new tank. The Department's inspector, Colleen Bierbach, acknowledged that All Florida called for an installation inspection of newly installed tanks on April 8, 2004. On the morning of April 9, 2004, after the new tanks had been installed, Ms. Bierbach went to 8817 and 8821 Bellrose Avenue. She observed raw sewage on the ground flowing toward the septic tanks. She took photographs of what she observed, but the copies of the photographs received in evidence are too blurry to show the extent of what she saw. Mr. Smith arrived at the work site just after Ms. Bierbach arrived on April 9, 2004. The description of the violation in the citation states that Mr. Hoag, the plumber, "disconnected the stub out line running from the house to the existing septic tank prior to the installation of the new septic tanks thus creating a sanitary nuisance." The evidence is insufficient to prove that Mr. Smith's actions, as opposed to the actions of Mr. Hoag, caused the unsanitary conditions.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Health, Duval County Health Department, dismiss the citation issued to Mr. Smith on April 15, 2004. DONE AND ENTERED this 26th day of April, 2006, in Tallahassee, Leon County, Florida. S BARBARA J. STAROS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 2006. COPIES FURNISHED: Catherine R. Berry, Esquire Department of Health 515 West Sixth Street Jacksonville, Florida 32206-4311 James L. Smith All Florida Septic Tank Service, Inc. 8300 W. Beaver Street Jacksonville, Florida 32220 R. S. Power, Agency Clerk Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701 Timothy M. Cerio, General Counsel Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701 Dr. M. Rony Francois, Secretary Department of Health 4052 Bald Cypress Way, Bin A00 Tallahassee, Florida 32399-1701

Florida Laws (6) 120.57381.0012381.0061381.0065386.03386.041
# 3
FLORIDA REAL ESTATE COMMISSION vs SANDRA B. FRAZIER, 90-006189 (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Sep. 28, 1990 Number: 90-006189 Latest Update: Mar. 27, 1991

Findings Of Fact At all times material to this proceeding, Sandra B. Frazier was a licensed real estate broker-salesman in the State of Florida, License No. 0185565, as an associate with Property Associates, Inc., Tallahassee, Florida. On July 1, 1989, Howard M. Burkholz, Leslie Burkholz, and Jacob H. Schiff entered into an Exclusive Right of Sale Agreement with Property Associates, through its agent, Frazier, for the sale of a house located in Forest Green Subdivision, at 2062 Pepperidge Way, Tallahassee, Florida. The Exclusive Right of Sale Agreement states in part: Seller further certifies and represents that the property has no latent defects except the following: septic tank is pumped monthly at Sellers request. [sic] Mr. and Mrs. Burkholz both told Frazier that the septic tank was not a problem, but Frazier had previous knowledge of septic tank problems in the vicinity and of the significance of needing septic tank pumping. Frazier sold the house across from the Burkholz's house. That house, at 2061 Pepperidge Way, was bought by Marcie Doolittle in December of 1988. The listing information and Notice to Prospective Buyers showed that, due to the composition of the soil and heavy rains, it was necessary to have the septic tank pumped. The seller offered an offset to the buyer for the cost of additional drainfield. Only after Doolittle bought the house did Frazier learn of the severity of the problems and the necessity for pump outs every two weeks. In a letter written by Frazier to Doolittle on February 9, 1989, Frazier indicated that "once a septic tank fails it does not correct itself. It then requires regular pumping." Frazier suggested that the only resolution was more drainfield or regular pumping. After Frazier listed the Burkholz house, she mentioned to Mrs. Doolittle that she could not show the Burkholz house during wet weather because the backyard, in which the septic tank and drainfield was located, was too boggy. Further, Frazier discussed with Mrs. Doolittle that the city was going to install sewer in the area because of the septic tank failures. In conformance with the Exclusive Right of Sale agreement with the Burkholzs, Frazier listed the house through the Multiple Listing Service. The data on the house was input on an input sheet. If there are defects, they can be listed on lines RE1-RE4 on the input form. Despite her knowledge about the Burkholz's septic tank and the Doolittle's septic tank, Frazier did not list this as a defect. Mary Wheatley, a sales associate with Bob Wolfe Real Estate, worked with Jesse and Susan Day to locate a house to purchase. She showed the Days the Burkholz house. Her only knowledge of that house came from the MLS listing, the brochure entitled Highlights of this Home prepared by Frazier, and from information verbally given by Frazier. Wheatley had no knowledge of the septic tank problems and Frazier did not tell her anything about the septic tank or the potential hook up to city sewer. After various offers and counteroffers, the Days and the Burkholtzs signed a contract for the sale and purchase of the house on November 24, 1989. The Contract states in paragraph 14: CONDITION OF PROPERTY: BUYER ACKNOWLEDGES THAT HE HAS NOT RELIED UPON ANY REPRESENTA- TIONS MADE BY A REALTOR(S) AS TO THE CONDI- TION OF THE PREMISES. . . .SELLER warrants that the . . . septic tank . . . shall be in working order on the date of closing. SELLER agrees to repair any of the preceding items not in working order. BUYER agrees to inspect the property prior to closing to determine condition of said items; . . . If BUYER fails to make inspections as required, BUYER agrees to accept property in "as is" condition. BUYER and SELLER will diligently learn and disclose to each other prior to closing all facts affecting the value of the property. On December 26, 1989, the night before the closing, the Days, the Burkholzs, Frazier, and Wheatley did the final walk through. While Wheatley and Susan Day were in another room measuring for curtains, Mr. Day flushed a toilet and noted that it went down very slowly. He asked if there were septic tank problems. Mr. Burkholz indicated that there were, but that sewer hookup was coming and the septic tank was pumped out monthly by the city at no cost. Mr. Day asked about the costs and was told that the pumpouts were free and the sewer would cost several hundred dollars. There is a clear conflict in the testimony of the various witnesses about the sewer cost estimate given to Mr. Day, but the exact figure is of no consequence to the ultimate outcome of the case. Therefore the conflict is not resolved. The Days discussed the septic tank and sewer hookup and decided to go through with the closing. After the walk through, they signed an inspection sheet in which they accepted the premises as inspected, without any noted exceptions, and they relieved the sellers and the realtor from further warranty or responsibility for the condition of the property. According to Thomas Bryant, an engineer with the City of Tallahassee, in December, 1989, no one knew whether there would be sewer installed in Forest Green or the potential cost of sewer hookup. No one knew that even on the date of hearing. The city did enter into an agreement to charge $650 for sewer hookup in Forest Green, but there are additional charges and costs to the homeowner which are as yet undetermined. The septic tank problems constitute a latent defect which should have been disclosed to the buyers before a contract was agreed upon. The failure to disclose is not egregious since the regular pumping of the septic tank is done at no cost to the homeowner and results in no liability to the homeowner. The projected sewer hook up was too uncertain to have required such disclosure.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Florida Real Estate Commission enter a Final Order and therein: Find Sandra B. Frazier guilty of one Count of concealment in violation of Section 475.25(1)(b), Florida Statutes. Based on the mitigating factors set forth above and on the relatively minor nature of the offense, impose a fine of $100.00 on Sandra B. Frazier. Issue a written reprimand to Sandra B. Frazier. RECOMMENDED this 27th day of March, 1991, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of March, 1991. APPENDIX TO THE RECOMMENDED ORDER, CASE NO. 90-6189 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted in this case. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Sandra B. Frazier Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1(1). Proposed findings of fact 2-9 are subordinate to the facts actually found in this Recommended Order. COPIES FURNISHED: Janine B. Myrick Senior Attorney Department of Professional Regulation Division of Real Estate 400 West Robinson Street Post Office Box 1900 Orlando, FL 32801-1772 William J. Haley Attorney at Law Post Office Box 1029 Lake City, FL 32056-1029 Jack McRay, General Counsel Department of Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 Darlene F. Keller Division of Real Estate 400 West Robinson Street Post Office Box 1900 Orlando, FL 32801

Florida Laws (2) 120.57475.25
# 5
LARRY A. FORD, D/B/A LA FORD SEPTIC TANK SERVICES vs DEPARTMENT OF HEALTH, 97-000898 (1997)
Division of Administrative Hearings, Florida Filed:O Brien, Florida Feb. 27, 1997 Number: 97-000898 Latest Update: Jan. 02, 1998

The Issue The issues are (1) whether Respondent violated Chapters 381, 386, and 489, Florida Statutes; and if so, (2) whether Respondent is subject to an administrative fine; and if so, (3) what penalty should be imposed.

Findings Of Fact At all times material to this proceeding, Petitioner was registered with Respondent as a septic tank contractor, under the authorized name of LA Ford Septic Tank. As of March 1, 1995, single compartment septic tanks must be used in series or in conjunction with a outlet filter which has been approved by Respondent. An outlet filter is designed to prevent solid wastes from reaching the drainfield of a septic system. Removal of an outlet filter will cause the premature failure of a drainfield system and create a potential sanitary nuisance. In September of 1996, Rita Haynes contracted with Petitioner for the installation of a septic system for her mobile home. The system received construction approval from the Suwannee County Health Department on September 5, 1996. At that time, the outlet filter was attached to the system. On September 12, 1996, the Suwannee County Health Department re- inspected the system. The inspector discovered that the filter was missing. Ms. Haynes did not remove the filter or authorize anyone else to do so. Removal of the outlet filter constituted theft of Ms. Haynes' property. Allegations concerning the removal of the outlet filter on Ms. Haynes' property are included in the Administrative Complaint at issue here. In September of 1996, Tracy Fernandez contracted with Petitioner to install a septic system for her mobile home. The system received construction approval from the Suwannee County Health Department on September 4, 1996. At that time, the outlet filter was present. The filter was missing when the Suwannee County Health Department re-inspected the system on September 10, 1996. Ms. Fernandez did not remove the filter or authorize anyone else to do so. Removal of the outlet filter constituted theft of Ms. Fernandez's property. Allegations concerning the removal of the outlet filter on the property of Ms. Fernandez are included in the Administrative Complaint at issue here. In July of 1996, Laura Landen contracted with Ford to install a septic system for her mobile home. Petitioner told Ms. Landen that he would save her some money by removing the outlet filter after the initial inspection. The system received construction approval from the Suwannee County Health Department on July 24, 1996. At that time, the outlet filter was attached to the septic tank. The filter was missing when the Suwannee County Health Department re-inspected the system on September 11, 1996. Ms. Landen did not remove the filter or authorize anyone else to do so. Removal of the outlet filter constituted theft of Ms. Landen's property. Allegations concerning the removal of the outlet filter on Ms. Landen's property are included in the Administrative Complaint at issue here. In October of 1996, John and Mary Phillips contracted with Petitioner to install a septic system for their home. The system received construction approval from the Columbia County Health Department on October 23, 1996. At that time, the outlet tee filter was present. Subsequently, the Phillips' daughter saw Petitioner take something out of the septic tank. The filter was missing when the Columbia County Health Department re-inspected the system on October 25, 1996. Mr. and Mrs. Phillips did not remove the filter or authorize anyone else to do so. Removal of the outlet filter constituted theft of the Phillips' property. Allegations concerning the removal of the outlet filter on the Phillips' property are included in the Administrative Complaint at issue here. In April of 1996, Marshall and Karen Merriman contracted with Petitioner to install a septic tank system on their property. The outlet filter was attached to the septic tank at the time of an initial inspection by the Suwannee County Health Department on April 22, 1996. Subsequently, Mr. Merriman saw Petitioner drive up and remove the outlet filter from the septic tank. Petitioner's removal of the outlet filter constituted theft of the Merrimans' property. A re-inspection by the Suwannee County Health Department on April 23, 1996, revealed that the outlet filter was missing. The inspector also discovered that Petitioner had not placed enough rock in the Merrimans' drainfield. Accordingly, the system did not pass final inspection. Mr. Merriman stopped payment on his check made payable to Petitioner in the amount of $909.50. Another septic tank contractor was hired to properly install the septic system on the Merrimans' property. Mr. Merriman's complaint to the Suwannee County Health Department resulted in a citation for a $1,500 fine against Petitioner for violating the following rules: (1) Rule 10D-6.0751(1)(k), Florida Administrative Code, practicing fraud or deceit; (2) Rule 10D-6.0751(1)(l)2, Florida Administrative Code, misconduct causing harm to customer; and (3) Rule 10D-6.055(3)(a), Florida Administrative Code, removal of outlet filter. Petitioner acknowledged receipt of the citation on September 24, 1996. That same day he requested an informal administrative hearing to contest the citation. The Suwannee County Health Department referred Petitioner's request for an informal hearing concerning the above-referenced citation to Respondent on September 27, 1996. Respondent then requested its District 3 Administrator to conduct the necessary proceedings and submit a Recommended Order to Respondent. The record does not reveal the disposition of Petitioner's request for an informal hearing regarding the citation. The Administrative Complaint at issue here does not contain any allegations relative to Mr. Merriman's complaint. However, since Petitioner did not dispute the material allegations contained in the citation, they may be considered as true in aggravation of any penalty imposed in the instant proceeding. In addition to the missing filters referenced above, the Columbia County Health Department found filters missing from Petitioner's installations on property owned by Richard Johnson and David Timmerman in September of 1996. The filters had been present during prior inspections of Petitioner's installations on the Johnson and Timmerman properties. The removal of the outlet filters from the Johnson and Timmerman properties constituted theft of their property. The Administrative Complaint at issue here contains allegations concerning Petitioner's removal of these outlet filters. The Suwannee County Health Department and the Columbia County Health Department had many citizen complaints about Petitioner's work. They performed a random check of all recent septic tank installations in their respective counties. They re- inspected the septic tank installations of other registered septic tank contractors as well as Petitioner's installations. They found missing outlet filters only in Petitioner's installations. The two health departments began spray painting a spot on filters during initial inspections to stop anyone from using the filters at multiple installations and inspections. Petitioner habitually, and as a routine business practice, removed the outlet filter from the septic tanks he installed after the initial inspection but before he covered the tank with dirt. He was responsible for stealing the required outlet filters on the property of Rita Haynes, Tracy Fernandez, Laura Landen, John and Mary Phillips, David Timmerman, and Richard Johnson. In each of these instances, Petitioner acted fraudulently and deceitfully. His gross misconduct created a potential sanitary nuisance and caused his customers monetary harm. An outlet tee filter costs approximately $50. Petitioner was able to underbid his competitors by removing the filter from an inspected system and using the same filter on another installation. From time to time, septic tanks need to be pumped out to prevent the flow of sludge and solids from the tank into the drainfield. Sludge and solids will clog the drainfield causing the system to fail. A failed system is expensive to repair or replace. A failed system also creates a public health hazard. When a septic tank is pumped out, all of the sludge should be removed. After the tank is empty, it should be washed down with a hose and inspected for cracks. If the tank is in good condition, a septic tank contractor is supposed to sign an inspection slip. In September of 1996, Allen Donaway contracted with Petitioner to pump out his septic tank and install a new drainfield. Petitioner's employees arrived at Mr. Donaway's residence on or about September 18, 1996, to pump out the tank. They claimed they had completed the job even though they left 12 or more inches of sludge at the bottom of the tank. Despite Mr. Dunaway's demands, Petitioner's employees refused to pump any more septage from the tank. When Mr. Donaway contacted Petitioner to complain that his employees had only partially pumped the tank, Petitioner demanded immediate payment. Mr. Donaway gave Petitioner a check for $135 which Petitioner cashed immediately. Mr. Donaway had to pay another registered septic tank contractor to pump the rest of the sludge from the tank and to install the new drainfield. Allegations concerning Petitioner's failure to completely pump out the sludge from Mr. Donaway's septic tank are contained in the Administrative Complaint at issue here. In a Letter of Warning dated July 15, 1996, the Columbia County Health Department informed Petitioner that Debbie Gregory had filed a complaint against him for an unsatisfactory septic pump-out. This letter requested a response to an allegation that Petitioner, without good cause, had abandoned a project which he was under a contractual obligation to perform in violation of Rule 10D-6.0751(1)(g), Florida Administrative Code. Petitioner was advised that he could avoid the imposition of a $500 fine or a disciplinary action against his contractor's license by correcting the problem within five working days. As of August 6, 1996, Petitioner had not responded to the health department's inquiry. He made no attempt to correct the problem by completely removing the solids and greases from Ms. Gregory's septic tank. Petitioner was advised by letter that Respondent intended to initiate enforcement procedures. Allegations concerning the unsatisfactory septic pump-out on Debbie Gregory's property were included in the Administrative Complaint at issue here. Petitioner's failure to completely pump out all of the sludge from the septic tanks of Allan Donaway and Debbie Gregory created a potential health hazard. Additionally, his gross misconduct caused these customers monetary harm. They had to pay another septic tank contractor to complete Petitioner's work so that they could avoid the expense of prematurely replacing their drainfields. In August of 1996, Petitioner installed an onsite sewage treatment and disposal system on the property of Johnny Howard, Jr. The Suwannee County Health Department subsequently determined that Petitioner had installed the septic system on the wrong side of the Howard residence with the drainfield extending across the property line of the adjoining property. The inspector also discovered that the septic tank was installed next to a dryer vent opening in the Howard residence. When Petitioner refused to correct the problems at the Howard residence, the county health unit paid another septic tank contractor to correct the septic system. Respondent then filed an Administrative Complaint seeking revocation of Petitioner's septic tank contractor's registration and imposition of an administrative fine. On July 22, 1997, Respondent entered a Final Order in Department of Health Case Number 97-154 which revoked Petitioner's septic system contractor's registration and imposed a fine in the amount of $1000 due to the improper installation of the septic system at the Howard residence. This Final Order approved and adopted a Recommended Order in DOAH Case Number 96-5543, finding that Respondent was guilty of violating Rule 10D-6.0751(1)(b)2, Florida Administrative Code, for completing contracted work at the Howard residence without a permit and Rule 10D-6.0751(1)(l)2, Florida Administrative Code, gross misconduct causing monetary harm. Allegations concerning Petitioner's improper installation of the septic system on Mr. Howard's property were not contained in the instant Administrative Complaint. However, they may be considered in aggravation of any administrative fine imposed in the instant case. In the course of investigating citizen complaints against Petitioner, Respondent learned that Petitioner was advertising his business using the name of Ford Septic Tank and/or Ford Septic Tank Service(s) on his trucks and in the Yellow Pages. Petitioner's authorized business name is LA Ford Septic Tank. Respondent sent Petitioner a Letter of Warning dated August 27, 1996, advising him that advertising his services in a form other than his authorized business name violated part III of Chapter 489, Florida Statutes, and Rule 10D-6.0751(1)(a), Florida Administrative Code. The letter informed Petitioner that continued violations could result in an administrative fine of $500 per day. The letter stated that the violations might be cited in a future complaint based on repeat violations. Petitioner did not exercise his option to request an administrative hearing to contest the allegations contained in the Letter of Warning. On November 20, 1996, employees of the Suwannee County Health Department took photographs of Petitioner's business sign using an unauthorized name on a county road in Suwannee County. On November 22, the same employees took photographs of Petitioner's trucks bearing an unauthorized name. Petitioner's persistence in using an unauthorized business name was especially egregious because other septic tank contractors with the last name of Ford, who were not affiliated with Petitioner, worked in the same commercial and residential areas. For example, Mr. Merriman contracted with Wilbur Ford to correct the septic system that Petitioner improperly installed. North Florida Septic Tank was owned by Robert and Donna Ford. Their Yellow Page advertisement specifically disclaimed any affiliation with Petitioner. The instant Administrative Complaint contains allegations concerning Petitioner's use of an unauthorized name to advertise his business. Petitioner filed an application to become a registered septic tank contractor on August 6, 1991. Petitioner was convicted of grand theft and stopping payment on a check with intent to defraud on October 28, 1991, in the circuit court of Hernando County, Florida. Petitioner was convicted of these two felonies before he took the septic tank contractor's examination in November of 1991. Petitioner did not inform Respondent about the two convictions. Petitioner obtained his septic tank registration through fraud or misrepresentation by failing to disclose his felony convictions. The instant Administrative Complaint contains allegations concerning Petitioner's failure to disclose the two felony convictions. Respondent's efforts to persuade Petitioner to correct his improper installations and/or unsatisfactory pump-outs were not successful. He made no attempt to replace the filters he removed. He did not heed Respondent's warnings regarding his use of an unauthorized business name. He has failed to make any effort to rehabilitate himself or to mitigate the effects of his behavior despite the following: (1) the severity of his offenses; (2) the danger to the public that he created; (3) the number of times that he repeated the offenses; (4) the number of complaints filed against him; and (5) the monetary harm he caused his customers.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that Respondent enter a Final Order imposing an administrative fine in the amount of $7,000 against Petitioner. DONE AND ENTERED this 5th day of September, 1997, in Tallahassee, Leon County, Florida. SUZANNE F. HOOD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 5th day of September, 1997. COPIES FURNISHED: Thomas D. Koch, Esquire Department of Health Building 6, Room 133 1317 Winewood Boulevard Tallahassee, Florida 32399-0700 Larry A. Ford 25295 CR 137 O'Brien, Florida 32071 Angela T. Hall, Agency Clerk Department of Health Building 6 1317 Winewood Boulevard Tallahassee, Florida 32399-0700 Pete Peterson, Esquire Department of Health Building 6, Room 102-E Tallahassee, Florida 32399-0700 James Howell, Secretary Department of Health Building 6, Room 306 1317 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (10) 120.57381.0011381.0012381.0061381.0065381.0066381.0072386.03386.041489.553 Florida Administrative Code (1) 64E-6.022
# 6
DEPARTMENT OF HEALTH vs VIRGIL CARDIN, D/B/A VIRGIL CARDIN SEPTIC TANK SERVICE, 13-000462 (2013)
Division of Administrative Hearings, Florida Filed:Lakeland, Florida Feb. 06, 2013 Number: 13-000462 Latest Update: Jun. 24, 2013

The Issue Whether Respondent, Virgil Cardin, d/b/a Virgil Cardin Septic Tank Service (Respondent or Cardin), committed the violations alleged in the Administrative Complaint for Imposition of Administrative Fines and Revocation of Septic Tank Contractor License and Business Authorization, dated December 28, 2012, and, if so, what penalty should be imposed.

Findings Of Fact The Parties Petitioner is the state agency charged with the responsibility of administering the Standards for Onsite Sewage Treatment and Disposal Systems (SOSTDS). The installation, repair, and/or alteration of any septic tank system fall within the purview of Petitioner's authority. Public health concerns mandate that all septic tank systems be operated according to governing laws and rules. Respondent is a resident of the State of Florida and is registered by Petitioner to provide septic tank contracting services within the state. Respondent's registration number is SR0890865. Respondent owns and operates Virgil Cardin Septic Tank Service located in Lakeland, Florida, and the company is authorized to provide septic tank contracting services. The company's authorization number is SE093690. Septic tank contracting services are governed by SOSTDS. The Controversy It is undisputed that a permit must be obtained prior to performing repairs to a septic tank system. In Polk County (where all actions complained of occurred), a septic tank service company is required to apply for a permit before work is performed, obtain an inspection by appropriate authorities before beginning work, and complete all work in accordance with designated standards. A septic tank pump-out does not require a permit. Any work that would involve the exposure of the drain fields and/or the refitting of portions of the septic system would require a permit. The controversy in this case stems from Respondent's failure to obtain a permit before beginning repairs to a septic tank system located at 4931 Rolling Meadows Drive, Lakeland, Florida. It is undisputed that Respondent did not, in advance of starting work at the home, obtain a permit. The Arguments The Digans own a home located at 4931 Rolling Meadows Drive, Lakeland, Florida. For several years, the Digans have experienced problems with their septic tank system to the point that waste from the septic system has backed up into their home. Previously, Respondent addressed the Digans' septic tank system problems by pumping the waste from the tank, thereby eliminating pressure on the overwrought system. On or about August 24, 2012, Respondent went to the Digans' home and pumped out the septic tank. A permit for the work done that date was not required. Given the history of the problems with the Digans' system, it became apparent to the owners and Respondent that comprehensive repairs to the system were necessary. As there was no way to predict when another pump-out might be required, it was not surprising that approximately one week later Respondent returned to the Digans' property for additional work. On that date, September 1, 2012, Respondent could not pump out the Digans' tank, because his truck was already full. Instead, Respondent took a backhoe to the Digans' property and began to dig trenches for the drain field. Respondent's employee began to construct a septic drain line header pipe with drain field chamber end plates attached. Respondent exposed the Digans' septic system as if he were going to make repairs to the system. When confronted by two environmental supervisors who observed Respondent's actions, Respondent readily admitted he did not have a permit for the work. At first, Respondent stated that the homeowners could not afford permits. Later, Respondent maintained that the work he performed on September 1, 2012, did not require a permit. Petitioner maintains that Respondent went to the Digans' home on September 1, 2012, to make repairs to the septic tank system without prior inspection or a required permit. The Analysis Prior to September 1, 2012, Respondent knew or should have known that the Digans' septic tank system needed extensive repairs. Respondent had pumped out the tank several times and should have known that the system was not functioning as intended. Prior to September 1, 2012, Respondent knew or should have known that repairs to any septic tank system require an inspection and permit. On September 4, 2012, after being caught the prior Saturday on the Digans' property, Respondent applied for a permit for the repairs to the Digans' septic tank system. On September 5, 2012, a repair permit was issued for the Digans' property. On September 7, 2012, the repairs to the Digans' system were inspected and approved. There was no emergency on September 1, 2012, that necessitated repairs to the Digans' septic tank system on that date. Pumping out the Digans' tank on that date would have addressed any immediate concern. On-site inspections before septic tank systems are repaired are critical to public health because they assure that groundwater contamination is avoided, that the existing tank is sound and will function as intended, and that setbacks to other properties, wells, or systems are adequate. Respondent knew or should have known that performing any work before an inspection negates the safeguards to public health concerns. Respondent knew or should have known that the materials needed to adequately repair the Digans' septic tank system exceeded the chambers he took to the site on September 1, 2012. Digging up the Digans' system on September 1, 2012, created a sanitary nuisance. Respondent's History In the event a violation is found in this case, Respondent's disciplinary history would be relevant in considering what penalty, if any, should be imposed. To that end the following findings are made: Respondent has previously been found in violation of failing to call for a required inspection; and Respondent has previously been found in violation of practicing fraud or deceit, making misleading or untrue misrepresentations, or misconduct that causes no monetary harm to a customer.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent's authorizations to perform septic tank services be suspended for a period not less than 90 days. Additionally, it is RECOMMENDED that Respondent be required to pay an administrative fine in an amount not less than $2,000.00. DONE AND ENTERED this 6th day of May, 2013, in Tallahassee, Leon County, Florida. S J. D. PARRISH Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 6th day of May, 2013. COPIES FURNISHED: John H. Armstrong, M.D., F.A.C.S. State Surgeon General Department of Health Bin A00 4052 Bald Cypress Way Tallahassee, Florida 32399-1701 Jennifer A. Tschetter, General Counsel Department of Health Bin A02 4052 Bald Cypress Way Tallahassee, Florida 32399-1701 Althea Gaines, Agency Clerk Department of Health Bin A02 4052 Bald Cypress Way Tallahassee, Florida 32399-1703 Tony C. Dodds, Esquire Law Office of Tony C. Dodds 904 South Missouri Avenue Lakeland, Florida 33803-1034 Roland Reis, Esquire Polk County Health Department 1290 Golfview Avenue, Fourth Floor Bartow, Florida 33830-6740

Florida Laws (2) 381.0065489.556
# 7
DEPARTMENT OF HEALTH vs FRANK CRIMI, D/B/A A. LAMPSON SEPTIC TANK COMPANY, 98-000203 (1998)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Jan. 13, 1998 Number: 98-000203 Latest Update: Sep. 25, 1998

The Issue Whether Respondent committed the violations alleged in the Administrative Complaint. If so, what action should be taken against him.

Findings Of Fact Based upon the evidence adduced at hearing and the record as a whole, the following findings of fact are made: The Department is a state government licensing and regulatory agency. Respondent is registered with the Department as a septic tank contractor. Gayle Gibson owns and resides in a three-bedroom, two- bath single-family home located at 2425 Riverlane Terrace in Fort Lauderdale, Florida (Gibson's property). In late 1993 or early 1994, Gibson was experiencing problems with the septic system on her property (in the form of sewage backup and resultant unpleasant odors). Gibson contacted Respondent (who is the son of Gibson's former mailman) and asked him to come to her property to ascertain what was wrong and to take whatever remedial action was necessary. Respondent complied with Gibson's request and went to her property. After examining the situation, he told Gibson that she needed to have the septic tank on the property pumped and a new drainfield installed. Respondent recommended that the new drainfield be installed on the side of Gibson's home, instead of in the front yard (where the existing drainfield was located). Gibson made arrangements for Respondent to perform these services in exchange for money and art work. These arrangements between Gibson and Respondent were not reduced to writing. On or about January 20, 1994, Respondent pumped out the septic tank on Gibson's property and Gibson paid him $200.00, by check, for having performed such work. In late February of 1994, Respondent installed a new drainfield on the side of Gibson's home and Gibson paid him $500.00, by check, for having performed such work. At no time did Respondent obtain a permit to install the drainfield. The heavy equipment that Respondent used to perform the work was unloaded in Gibson's front yard. The unloading of the heavy equipment damaged the front yard. It cost Gibson a total of $175.00 to have the damage repaired. The drainfield that Respondent installed was an EEE ZZZ Lay Drain system comprised of Styrofoam material. Considering the size of Gibson's home, the drainfield was grossly undersized, as Respondent should have realized. It was approximately one-third the size it should have been. Predictably, shortly after this undersized drainfield was installed, Gibson again experienced sewage backup and related problems on her property. Gibson informed Respondent of the reoccurrence of these problems. Respondent told Gibson that he would take remedial action if Gibson paid him another $500.00. Gibson refused to make any additional payments to Respondent. Respondent never returned to Gibson's property to correct the error he had made in installing an undersized drainfield. Gibson contacted the Department and advised it of the problems she was experiencing with her septic system. Following an investigation of the matter, the Department issued the Administrative Complaint described in Preliminary Statement of this Recommended Order. Subsequently, on January 13, 1998, in an unrelated case, the Department issued and served on Respondent a citation imposing a $500.00 fine against Respondent for abandoning, without good cause, a septic system installation project he was contractually obligated to complete. The citation contained a "Notice of Appellate Rights," which indicated that "[t]his citation becomes a Final Order of the Department if you have not contested the Citation within thirty (30) days of the date which the Citation was served upon you." Respondent has neither "contested" the citation, nor paid the $500.00 fine it directed him to pay.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department enter a final order finding Respondent guilty of the unlawful conduct alleged in the Administrative Complaint and disciplining him therefor by suspending his septic tank contractor's registration for 90 days and fining him in the amount of $1,000.00. DONE AND ENTERED this 29th day of June, 1998, in Tallahassee, Leon County, Florida. STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 29th day of June, 1998.

Florida Laws (11) 120.569120.57381.0065381.0067489.551489.552489.553489.556489.558775.082775.083 Florida Administrative Code (2) 64E-6.00864E-6.022
# 8
DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES vs NORMAN SUTTON, D/B/A NORMAN SUTTON CONSTRUCTION COMPANY, 95-001470 (1995)
Division of Administrative Hearings, Florida Filed:Punta Gorda, Florida Mar. 24, 1995 Number: 95-001470 Latest Update: Feb. 15, 1996

The Issue The issue in this case is whether Respondent created a sanitary nuisance by installing drainfield pipes too far apart in a septic tank drainfield and failing to seal the lid to a septic tank, failing to call for a required inspection before covering an onsite sewage disposal system, and engaging in gross misconduct by assaulting two of Petitioner's employees.

Findings Of Fact Respondent is registered with Petitioner as a septic tank contractor and authorized to provide septic tank contracting services. On May 4, 1994, pursuant to a previously issued permit, Respondent completed the installation of a new drainfield at 204 West DelMonte Avenue in Clewiston. He asked Petitioner's office for an inspection for approval to cover the system. Jim Rashley, an environmental specialist employed by Petitioner, inspected the system on the morning of May 4. No one was at the site during the inspection. Mr. Rashley discovered a violation concerning the type of header pipe. He also discovered that the drain lines were more than 36 inches apart and 18 inches from the side of the field. Mr. Rashley determined that the drainfield pipes were three feet and four inches apart. Examining the septic tank itself, which Respondent had pumped, Mr. Rashley found that the lid had not been properly resealed, which would allow rain or dirt to enter the tank or effluent to escape from the tank if the drainfield failed. Returning to his office, Mr. Rashley informed his supervisor, Steve Havig, that he was failing the system and called Respondent and told him the same thing. Respondent asked Mr. Rashley to come out to the site so they could both examine the system, and Mr. Rashley agreed. When they met at the site, Respondent asked Mr. Rashley to point out the three violations, which he did. Respondent's response was to tell him that he was sick and tired of college kids telling him how to install septic tank systems. Mr. Rashley said that he could not ignore violations of the rules. After Respondent became more upset, he moved to within inches of Mr. Rashley's face and asked him if he would approve the system. Mr. Rashley answered he would if Respondent fixed the violations. While Respondent yelled at Mr. Rashley only a few inches from his face, Mr. Rashley, feeling very uncomfortable, retreated to his vehicle and started to drive back to his office. Respondent got into his vehicle and tailgated Mr. Rashley the entire way. When they arrived at Mr. Rashley's office, Respondent told the secretary to call Mr. Rashley's boss. Claiming that Mr. Rashley had unfairly disapproved the system, Respondent asked Mr. Havig to visit the site himself. Mr. Havig agreed to do so. Mr. Havig visited the site on the morning of May 5 outside the presence of Respondent. He confirmed the violations. At their closest point, the drain lines were three feet four inches apart, and the septic tank lid was not sealed. Mr. Havig left a message for Respondent with this information. At Respondent's request, Mr. Havig agreed to meet Respondent at the site at 1:30 pm. Returning from lunch with two other men, Mr. Havig stopped off at the site to meet Respondent. He found that the header pipe violation had been corrected, but the other violations had not been. Mr. Havig and Respondent talked about the separation of the drain lines. Respondent said he could not move the pipe without disturbing the elevation, which is crucial to the functioning of the drainfield. Mr. Havig said he could either move the pipe or add another line so as to reduce the maximum separation between lateral lines to below 36 inches. Respondent complained that he could not maintain the position of the flexible pipe when pouring gravel over the pipes. Respondent became angry. He grabbed a section of the plastic pipe and said that he would show Mr. Havig. The gravel fell in behind the place where the pipe had rested. Respondent declared that he would get the homeowner's approval to cover up the system rather than modify it. Mr. Havig went to his car to get a camera, and Respondent began using a lot of vulgarity. As Mr. Havig took pictures of the installation, Respondent became angrier. His face turned red and he accused Mr. Rashley and Mr. Havig of harassing him. He warned Mr. Havig that, if they did not stop, they would have to suffer the repercussions. Moving very close to Mr. Havig and pounding his fist into his hand, Respondent asked Mr. Havig if he knew what Respondent meant. Mr. Havig said yes, that it was time for him to go. Respondent covered the system up shortly after Mr. Havig departed. Respondent did not allow a reinspection of the system to determine if he corrected either the separation of the drain lines, which he admits he did not correct, or if he sealed the septic tank lid, which he claims he did correct. Respondent has worked as a septic tank contractor in the area for 18 years. The likelihood of system failure is high if a septic tank lid is not properly sealed before the system is covered and placed into operation. Respondent appears to have been a responsible contractor. Based on these facts, there is enough doubt on the lid-sealing issue to preclude finding that Petitioner proved by clear and convincing evidence that Respondent did not seal the lid before covering the system. The pipes constituting the drain lines are manufactured to allow 18 inches of effluent to escape from either side of the pipe. By installing lines with more than 36 inches between each other or 18 inches between a line and a side, Respondent reduced the efficiency of the drainfield because parts of the drainfield, which lies beneath the lines, will not receive as much effluent as other parts of the drainfield. For awhile, due to safety concerns, Petitioner had to send two inspectors to inspect Respondent's work sites. Respondent never apologized to either Mr. Rashley or Mr. Havig until, acknowledging his unprofessional behavior, he apologized during the hearing. Respondent also noted that Petitioner has dealt with him professionally since the incidents in question. Petitioner and Respondent have had troubled dealings in the past. On one occasion, Petitioner insisted on the placement of a drainfield adjacent to an existing, failed drainfield, even though the existing and proposed drainfields drained directly into a canal. Respondent wanted to locate the drainfield well away from the canal. Unable to secure approval locally, Respondent took an appeal to Petitioner's representatives in Tallahassee, who approved Respondent's original, more sensible plan to relocate the drainfield. On the other hand, Respondent violated the minimum- separation rule for drain lines in 1993. Petitioner fined Respondent for the violation.

Recommendation It is RECOMMENDED that Petitioner enter a final order finding Respondent guilty of violating Rule 10D-6.056(4)(b) and thus 10D- 6.075(2)(a) by installing a drainfield with excessive separation between drain lines, Rule 10D-6.075(4)(d) by failing to call for a required inspection, and Rule 10D-6.075(4)(l)1 by engaging in gross misconduct in his behavior toward two of Petitioner's employees. It is further recommended that the final order impose an administrative fine against Respondent in the amount of $500. ENTERED on July 14, 1995, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Floirda 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings on July 14, 1995. APPENDIX Rulings on Petitioner's Proposed Findings All adopted or adopted in substance except that Respondent failed to seal the septic tank lid, which is rejected as unsupported by the appropriate weight of the evidence. COPIES FURNISHED: Susan Mastin Scott Senior Health Attorney Department of Health and Rehabilitative Services P.O. Box 60085 Ft. Myers, FL 33906 Attorney Melanie A. McGahee 333 S. Commercio, Suite B Clewiston, FL 33440 Robert L. Powell Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Martha Valiant, M. D. Director, Hendry County Public Health Unit P.O. Box 70 LaBelle, FL 33935

Florida Laws (3) 120.57386.0416.075
# 9
ELINOR BURGER vs. ALEX RUTKOWSKI AND DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 79-002489 (1979)
Division of Administrative Hearings, Florida Number: 79-002489 Latest Update: May 15, 1980

The Issue Whether a septic tank construction permit should be issued by the Respondent, Department of Health and Rehabilitative Services, for use by the Respondent, Alex Rutkowski, owner of Lot number 6, Block E, Carlton Terrace Subdivision First Addition, in Clearwater, Florida. Whether the filling in of Lot number 6 and the construction of a septic tank will damage the residence of the Petitioner, Elinor Burger, on Lot number 5.

Findings Of Fact The Respondent, Alex Rutkowski, and his wife own Lot number 6, Block E, Carlton Terrace Subdivision, First Addition, in Clearwater, Florida in which the sixteen (16) lots are approximately 70 feet wide and 105 to 150 feet deep. The soil in the area is Mayakka Fine Sand, a poorly drained soil which has a water table normally at a depth of ten (10) to thirty (30) inches below ground surface, but which rises to the surface for a short time during wet periods. After respondent Rutkowski's initial application for a permit to install a septic tank on Lot number 6 had been denied, he employed an engineer and filed a plan for proposed site modification. The plan was received by the Respondent, Department of Health and Rehabilitative Services, and Rutkowski was notified on December 6, 1979, that the plan to remove the existing land fill, replace it with Astatula Fine Sand and raise the building pad appeared to be acceptable for the issuance of a septic tank construction permit, but that no further action on the application for the permit could be taken until after an administrative ruling on a protest by a neighboring property owner (Respondent' Exhibits 1, 4 and 5). The Pinellas County Engineering Department had approved the drainage for the area on October 9, 1979 (Respondent's Exhibit 2). The Petitioner, Elinor Burger, has lived on Lot number 5, which adjoins Lot number 6, since 1957. When there is a heavy rain of three (3) to four (4) inches, her septic tank fails to operate, and water stands in her back yard. She has seen and smelled polluted water standing in the street in front of her home. Water also stands on a second lot she owns adjoining her residence after a heavy rain preventing the mowing of the lot for long periods of time. Ms. Burger has unsuccessfully sought to connect to a sewer system by petitions for sewer connection on at least- three (3) occasions and has laid additional drainage lines to help solve her problem. In the spring, summer and fall of 1979, she had severe water problems. Ms. Burger believes the elevation of Lot number 6 would cause further water damage to her property, and that a septic tank on Lot number 6 would add more sewage problems to the area A witness for Petitioner, Alan Flandreau, who lives with his wife and three (3) children on lot number 13 adjoining Lot number 5 in the subdivision, has a septic tank that fills up in rainy weather and runs into the street, resulting in a stench and green slime. Flandreau has had his septic tank pumped out a number of times since 1968, when he bought his home. His lot is low, and water drains onto his property from other lots. A witness for Petitioner, Burl Crowe, owns Lot number 11 and lives on Lot number 12. Lot number 11 adjoins Lot number 6, and Lot number 12 borders on the property of Petitioner Burger. Crowe has lived on Lot number 12 for fourteen (14) years and on many occasions had water entering his garage and standing in his yard when it rains. He has seen Lot number 6 under water and water standing on the street in front of his house, A witness for the Respondents was Gerald Goulish, the professional engineer who prepared the site modification plan (Respondent's Exhibits 4 and 8). Goulish has studied the site together with Rule 10D-6 of the Florida Administrative Code (infra) and believes the plan to fill the location of the septic tank site will cause the soil to percolate and evaporate and the proposed elevation of Lot number 6 two (2) feet will cause the water to drain toward the street and not onto adjoining property. He suggested that the adjoining and adjacent property owners cooperate and construct common swales to eliminate the surface water problems. A second witness for the Respondents was Burt Fraser, a sanitary supervisor for the Pinellas County Health Department, who denied the first application for installation of a septic tank on Lot number 6 but notified Respondent Rutkowski that the lot could be modified. Thereafter, he wrote Rutkowski that a modification plan had been received which meets the minimum requirements of the Florida Administrative Code. Fraser stated that he will issue a permit for construction of a septic tank upon completion of the administrative hearing procedure unless directed not to issue such a permit. Fraser agreed that the conditions as described by Petitioner Burger and her witnesses are accurate, and that the subdivision has problems which will not be solved until sanitary sewers are installed, but he believes that he has no alternative except to issue a permit if an applicant meets the requirements of Rule 10D-6.25 Florida Administrative Code. He knows of no requirement to make a study of adjacent and adjoining properties, and Respondent Department has not made a study. There are seven (7) houses in the sixteen (16) lot subdivision. The area is low and subject to flooding because of soil texture. There is an undisputed drainage problem in the area which causes a septic tank problem to the residents. The addition of more houses and septic tanks will increase the already serious drainage conditions which are public health nuisances. The Respondent, Department of Health and Rehabilitative Services, submitted proposed findings of fact, memorandum of law and a proposed recommended order. These instruments were considered in the writing of this order. To the extent the proposed findings of fact have not been adopted in or are inconsistent with factual findings in this order, they have been specifically rejected as being irrelevant or not having been supported by the evidence.

Recommendation Based on the foregoing Findings and Conclusions of Law, the Hearing Officer recommends that Respondent Rutkowski's application for a permit for the construction of a septic tank on Lot number 6 be denied without prejudice to the Respondent to reapply if there should be a change in circumstances. DONE and ORDERED this 10th day of April 1980, in Tallahassee, Leon County, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED Barbara Dell McPherson, Esquire Department of HRS Post Office Box 5046 Clearwater, Florida 33518 William W. Gilkey, Esquire Richards Building 1253 Park Street Clearwater, Florida 33516 Mr. Alex Rutkowski 30 North Evergreen Clearwater, Florida

Florida Laws (1) 120.57
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer