HILLSBOROUGH COUNTY AND WEST COAST REGIONAL WATER SUPPLY AUTHORITY vs. GARDINIER, INC., 85-000599 (1985)
Division of Administrative Hearings, Florida Number: 85-000599 Latest Update: Jul. 11, 1986

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, as well as the stipulation of facts contained in the Prehearing Stipulation, the following relevant facts are found: The Gardinier Applications. l. The East Tampa Chemical Plant (plant) operated by Gardinier is located on approximately 3,500 acres of land owned by it at the mouth of the Alafia River and the Hillsborough Bay. The facilities have been there since 1924, and the withdrawal of water utilized to operate the plane predates the consumptive use permitting process. The plant manufactures various fertilizer products, including sulphuric acid, phosphoric acid, diammonium phosphate, granular triple superphosphate, run of pile triple superphosphate, byproducts of phosphoric acid, as well as fluosilic acid and sodium silicofluoride. The phosphoric acid products are used by farmers to grow corn, soy beans, and wheat, and fluosilic acid and sodium silicofluoride are used by municipalities to fluorinate drinking water. When the plant is fully operating, Gardinier employs 950 people with a payroll of $22 million a year. The company pays annual property and other taxes of $1.5 million a year and annually purchases approximately $25 million in materials and equipment in Hillsborough County. Garciinier was recently purchased by Cargill, Inc. after a bankruptcy proceeding. In order to manufacture its products and operate the plant, Gardinier uses both salt water and fresh water. The salt water comes from salt water wells located on the plant's property, and has been used since 1924 for cooling purposes. It is used for once-through, non-contact cooling of sulphuric acid and is then discharged into the Alafia River at the Hillsborough Bay. Due to the naturally occurring radium in this discharged salt water, Gardinier intends to discontinue using its salt water wells and utilize fresh water for all its cooling requirements. This will require the construction of a fresh water cooling tower, for which a permit is currently being sought and which will take about two years to complete. Gardinier's existing CUP No. 7601530 for its salt water wells permits an average annual withdrawal of 56,260,000 gallons of water per day (gpd) and a maximum daily withdrawal of 64,890,000 gpd. Despite expansions in its plant over the years, the amounts of salt water and fresh water required has decreased. Gardinier's present renewal application for its salt water withdrawals proposes a reduction to an average annual rate and maximum daily rate of 31,968,000 gpd . Fresh water is used at Gardinier's plant as boiler feed water, for manufacturing of product or process water, cooling and potable needs. This water is obtained from Buckhorn Springs and Lithia Sprlngs, both wholly owned by Gardinier. Gardinier purchased 148 acres at Buckhorn Springs in 1947, and 160 acres at Lithia Springs in 1967, including the spring pools, and has been withdrawing water from those springs since those times. Lithia Springs is leased to Hillsborough County for recreational purposes. Gardinier's withdrawals from the springs have been gradually reduced since 1977. The original CUP No. 7601532 issued in 1977 for Buckhorn Springs authorized an annual average withdrawal of 2,176,000 gpd with a maximum daily withdrawal not to exceed 2,370,800 gpd. Gardinier requested a reduced withdrawal s renewal application, with an annual average and a maximum daily rate of 1,440,000 gpd. Gardinier's original CUP No. 7601533 for Lithia Springs issued in 1977 was for 5,840,700 gpd average annual withdrawal and 5,894.000 gpd as a maximum daily withdrawal. Gardinier's renewal is for a reduced average withdrawal rate of 5,822,000 gpd and a maximum daily withdrawal of 5,904,000 gpd. The increased maximum quantity is for the well used for the concession stand at the park. Withdrawals from Gardinier's salt water wells consists of comingled waters from the intermediate aquifer, the Floridan aquifer and Hillsborough Bay. The water is salty, high in chloride and its constituents are very similar to bay water. The evidence is inconclusive as to whether Gardinier's operation of its salt water wells for a period of over 60 years has caused or contributed to salt water intrusion in thc area of the plant. There is some evidence that the pumping may have been beneficial in reducing salt water encroachment along the coast due to the release of pressure on the deeper Floridan aquifer which allows fresh water to move into the system. In any event, if there has been an adverse effect from more than 60 years of pumping, the effect would be reduced by the reduction in withdrawals which Gardinier now seeks in its permit renewals. While Gardinier is the largest use of water in the plant area, there are domestic wells in the vicinity of the plant. Computer modeling demonstrates that present withdrawals from the salt water wells will affect the potentiometric surface at the plant's boundary by less than five feet and create less than a one-foot drawdown in the water table. The greater portion of the water pumped is recharge water from the bay. Any reduction in the amount of pumping would have a positive impact on the potentiometric surface, will decrease any impact on nearby domestic wells and will allow the quality of the water in domestic wells to either remain stable or improve. Since the potentiometric surface in the plant's vicinity is already at sea level, it is SWFWMD's policy not to take into account the regulatory criterion relating to the lowering of the potentiometric surface below sea level. SWFWMD has not established regulatory levels for the rate of flow of streams or watercourses, the potentiometric surface or surface waters in the vicinity of the plant. Salt water marshes, estuarine systems and uplands exist to the north, south and east of the plant. Any adverse ecological impact suffered by these systems are more attributable to cultural impacts than to a less than one foot lowering of the water table. Since Gardinier's withdrawals have been occurring for over 60 years, it is likely that biological communities in the area have adapted, and the proposed reduction in pumping have no additional adverse effect. In order to satisfy its requirements for fresh water of reliable quantity and quality, Gardinier has been withdrawing water from Buckhorn Springs for almost 40 years and Lithia Springs for almost 20 years. The boilers and cooling towers at the plant are designed to utilize water of that quality and temperature. But for Gardinier's withdrawals, these spring waters would flow into the Alafia River and eventually into the bay. The spring water from Lithia is pumped through a pipeline to Buckhorn Springs, comingles with the Buckhorn spring water and is pumped some 1< miles through a pipeline to the chemical plant for use as boiler feed water, process water, cooling water and sanitary and drinking water. During full production periods, Gardinier uses all the water withdrawn from Lithia and Buckhorn Springs. Because of cutbacks in production in 1983, Gardinier installed a pressure relief valve to alleviate pressure problems in the plant during times of reduced production. This allowed water to be discharged into the Alafia River from the Lithia pipeline without passing through the plant. Over the past two years, approximately .5 to 1.2 million gallons of water per day has passed through the pressure relief valve and discharged in the Alafia River at a point downstream from where it would have entered the river naturally. Gardinier is presently in the process of developing an alternative pressure control system which would permit it to take from Lithia and Buckhorn Springs only the amounts actually required at the plant. Lithia Springs and Buckhorn Springs are typical karst artisian sink springs. The geology and hydrogeology of the area of both springs demonstrates a series of fault features, where solid rock has fractured and the fractures extend into the Floridan aquifer. Solutioning occurs and a sinkhole system is created. The springs are discharge points of the Floridan aquifer. These aquifer waters discharge into the springs from artisian pressure. An examination of various well logs and literature on Florida geology leads to the conclusion that the water in Lithia Springs and Buckhorn Springs withdrawn by Gardinier are supplied primarily by the Floridan aquifer with very minimal contribution from the intermediate or surficial aquifers. The withdrawals at both springs constitute ground water, as opposed to surface water, withdrawals. As noted above, Gardinier owns 148 acres at Buckhorn Springs and 160 acres at Lithia Springs. There are 350 feet from the edge of Buckhorn Springs to the nearest property line and 400 feet from the edge of Lithia Springs to the nearest property line. Pump tests designed to determine the lateral and vertical extent of the impact from the stress of pumping in amounts far greater than usual demonstrate that the impacts from withdrawals do not extend beyond 300 feet from the edge of either spring. After stabilizing the springs and pumping at a greater rate than normal, the pump tests revealed only a 1.25 foot decline in the spring boil, a 1.06 foot decline in the spring pool and no appreciable change in the water table or surface water at Buckhorn Springs. The impacts from pumping at Lithia Springs were even more minimal -- a two inch decline in the water level of the spring boil and a decline in the pool level of less than one inch. These results lead to the conclusion that the artisian systems are not adversely affected by Cardinier's pumping at Buckhorn or Lithia Springs. Chemical analyses reveals that the quality of the waters at Buckhorn and Lithia Springs has not been adversely affected by Cardinler's pumping or withdrawals. The proposed withdrawals will have no adverse effect upon vegetation in the areas of Lithla or Buckhorn Springs. There will be no inducement of salt water encroachment as a result of Gardinier's withdrawals from Lithia or Buckhorn Springs. SWFWMD has set no regulatory levels pertaining to the rate of flow of streams or watercourses, the level of the potentiometric surface or the level of surface waters in the areas of Buckhorn or Lithia Springs. It is the policy of the SWFWMD not to require extensive testing or monitoring when an applicant is applying for a renewal of a presently existing legal use, particularly when the renewal is for a permit with reduced quantities. In order to determine the future adequacy of the water supply available from Lithia and Buckhorn Springs, as well as to determine the effect of a diminuition of the outflow by outside sources, it would be beneficial to place continuous recording gases on spring flow, spring height and pumpage at those spring sites. Many industries are capable of and do now utilize reclaimed, recovered or recycled water in their plant operations. Dependent upon the plant's equipment and ;he quantity and quality of the reuse or recycled water, such water can be utilized in chemical plant operations for such nonpotable uses as cooling water, boiler feed and process water. A source of reuse water is treated effluent from advanced wastewater treatment facilities. Several new County wastewater treatment plants are presently in the planning stage, but none are currently on line nor are there pipelines in existence which could supply reuse water to Gardinier's East Tampa Chemical Plant. Use of the existing pipeline for reclaimed or reuse water would contaminate Gardinier's existing fresh water supply from the springs. Considering the quantity and quality of its present source of fresh water, reuse water has no technical or economic advantage to Gardinier. Its plant equipment would have to be retrofitted, a new distribution system both within and outside the plant would be required and experience by other industrial users has demonstrated problems with scaling, increased temperature and the consistency of water quality. When weighing the potential for reuse water in plant operations, a large factor to be considered is the economic feasibility, including the cost of treatment, maintenance costs, the cost of the current supply, availability, etc. While the reuse of water should be encouraged as a conservation measure, the economic feasibility of such use must be considered. Gardinier has studied and has agreed to continue to study the feasibility, both technical and economical, of reuse water for some of the plant operations. The Authority's and County's Application. The Authority is a five member governmental entity consisting of Pasco County, Pinellas County, Hillsborough County, the City of Tampa, and the City of St. Petersburg. Its obligations are to provide an adequate and dependable source of supply for all citizens within the tri-county area and to do so without concentrating withdrawals to the point where they would have an adverse environmental or hydrological impact. The Authority first began operating public supply wellfields in 1978. Currently, the Authority operates the Cypress Creek Wellfield, the Cross Bar Ranch Wellfield, the Starkey Wellfield, the Section 21 Wellfield, the Cosme-Odessa Wellfield, and the Northwest Hillsborough Wellfield. The permitted average annual withdrawal rate and maximum daily withdrawal of these wellfields are 30 million gallons per day (mgd)/30 mod for Cypress Creek, 30 mgdt45 mgd for Cross Bar, 8 mgd/15 mgd for Starkey, 13 mgd/22 mgd for Section 21 and Cosme-Odessa and 8.8 mgd/18.q mgd for the Northwest Hillsborough Wellfield. In addition, the Authority has a consumptive use permit to withdraw water from the Tampa Bypass Canal at a rate of 20 mgd average annual withdrawal and 40 mgd maximum daily withdrawal. The south central Hillsborough County region and service area has been described in this proceeding as an area bounded by Interstate ~ on the north, by Valrico on the east, by the Little Manatee River on the south and by Tampa Bay on the west. The area is largely a rural area, but has several population centers, including Brandon, Ruskin, Apollo Beach, Sun City and Riverview. The County's current public water supply facilities in the south central region comprise some 75 dispersed wells permitted under 8 different CUPs. The evidence is conflicting and inconclusive as to the actual number of existing wells and the quantities presently permitted. Some of the presently permitted wells have been converted to monitoring wells and others have been plugged. The Authority and the County have concluded that it is no longer possible to continue to use the County's existing public water supply facilities in the south central area. Consequently, they have applied for a CUP which would renew and consolidate their existing 8 CUPs and add 17 new wells to be located at a regional wellfield. It is the intent of the Authority and the County to continue using the existing wells during construction of the planned wellfield and then to discontinue their use and serve the entire area from a centralized wellfield. The amended application requests total average annual combined permit withdrawals of 24,100,000 gpd and total maximum daily withdrawals of 44,600,000 gpd. The current, existing Brandon water supply system is comprised of some 30 dispersed wells capable of producing from 7 to 10 mgd of good quality water. However, there are problems in this system, as well as the smaller systems serving Sun City, Apollo Beach, Ruskin and Riverview. The Brandon wells have individual chlorinators and, on occasion, suffer pressure problems. Because of their dispersed locations, the County's operators can only visit each well site once a day. If a problem occurs after the operator's visit, it will not be discovered until the following day and recipients of the water may use water that has not been disinfected. It is difficult to monitor and sample the well waters due to their dispersed locations. The existing system relies totally on local wells for local distribution as there is a complete lack of transmission facilities. The systems are hydraulically isolated and there is no transmission capacity within the Brandon system at all. While there is one intertie with the City of Tampa's water system, this is not used primarily because the City has its own supply problems and also because the City's water treatment is different than and incompatible with the County's water treatment. Some of the existing wells located south of the Alafia Rlver are old, in poor repair and violate Florida's drinking water standards for total dissolved solids, sulfates, fecal coliform and occasionally odor. Many of the existing well sites are not secured and their locations are such as to constrain access to the larger repair equipment. The existing system has inadequate storage capacity. On the basis of present demand for water within the system, there should be at least 10 million gallons of available storage. The current storage capacity is slightly more than 4 million gallons and not all of this storage is available. A storage tank is generally kept at least half full to provide for local fire demand and, therefore, the effective storage capacity of the existing system is about 2 to 3 million gallons. The existing water supply system lacks the capacity for both adequate fire protection and adequate emergency pumping. Retrofitting or refurbishing the existing system with newer or more dispersed wells would simply perpetuate the existing inadequacies in the system. For these reasons, the Authority and the County have determined that the only feasible alternative to solve the inadequacies and to meet the current and future demand is to provide a centralized system of transmission lines, centralized master pumping facilities and a centralized source of water supply. As the wellfield production wells, pump station and transmission lines are constructed and become operational, the existing wells will be either taken out of service or will be utilized as monitor wells. It is estimated that the construction of the proposed wellfield will take from 18 to 24 months. In reaching a determination as to the location and design of the proposed south central wellfield, the Authority and the County analyzed various alternatives. Studies and testing were done regarding the placement of a regional wellfield in the Brandon area. However, testing demonstrated that the potential yield would be very low in that area and could cause the upconing of highly mineralized water. Tests conducted further to the east, in the Medard area, demonstrated a productive aquifer with good water quality. However, because large amounts of water are withdrawn from that area by strawberry farmers, particularly during freezing weather, that site was found unsuitable for a regional wellfield. The Authority also investigated the feasibility of creating a surface water supply and constructing reverse osmosis plants. These alternatives were rejected due to concerns regarding economics, adverse environmental impacts and the production of sufficient yield. Testing performed at the Lithia site resulted in findings that the aquifer was productive and had a good quality of water. To confirm these findings, further testing was done to the east of the Lithia site at Alderman's Ford Park. This testing resulted in a finding of a high yield of water that met drinking water standards. While traces of a volatile organic compound were revealed, these were determined to have resulted from the laboratory cleaning process. Thus, the Alafia River corridor was determined to be the appropriate location for a regional wellfield because it would not compete with the agricultural irrigation to the north, would avoid the poorer water quality to the south and would produce an adequate yield. The Authority and the County have completed the preliminary design of the proposed wellfield. It is to consist of 17 production wells and a pump station. Wells 1 and 2 are to be used as standby wells and pumpage is to be rotated among wells 3 through 17 so that withdrawals are evenly distributed among those wells. The standby wells are only to be used if there is a failure at another well within the wellfield. Well 1 is already constructed and is located about 1 1/2 miles from Lithia Springs on 80 acres of land purchased by the County for the master pump station. Well 1 is located about 100 feet from the nearest property boundary to the south. The remaining wells would be placed on one-acre well sites to be purchased by the applicant and located somewhere within the 40 acre quarter-quarter sections which the authority submitted to the SWFWMD as proposed well locations. The total additional land area to be acquired for the well sites is 14 acres. Two of the wells will be located on land already owned by the County. Some of the wells are concentrated, with three in one section. The Authority has attempted to locate the wells adjacent to road right-of-ways which could be used for transmission pipelines. The Authority has not yet developed a management plan or a monitoring plan for the proposed wellfield. Each of the wells within the regional wellfield is designed to pump at an average annual withdrawal rate of 3 mgd and a maximum withdrawal rate of 4 mgd. If only one well were turned on in the system and no other wells were running, the well would produce 4 mgd. However, with all of the other wells running, a single well would only produce 3 mgd due to friction loss and the energy required to pump a large mass of water through the pipe under greater pressure. Thus, while the wellfield would be able mechanically to pump 60 mgd, the optimum production capacity will be 45 mgd. On an average day, pumping will be rotated among a small number of wells to produce a total of 24.1 mgd. On a peak day, all 15 wells would be producing approximately 3 mgd each for a total combined withdrawal rate of 44.6 mgd. Based upon a per capita consumption of 189 gpd, it is estimated that the total water supply requirements for the south central service area in the year 1990 to meet average day and maximum day demands is approximately 24 mgd and 44 mgd, respectively. The proposed wellfield is located along the north and south prongs of the Alafia River. That area is characterized by rural and light agricultural land uses, residential areas and recreational sites. Land uses in the area have been dependent upon private, individual water wells, many of which are shallow and draw water from an intermediate aquifer. One proposed well site has 31 property owners within 1/2 mile of the well. One hundred property owners live within 1/2 mile of proposed well 17. These domestic well users will not be served by the proposed system. The Authority has issued revenue bonds to finance the construction of the regional wellfield and transmission lines. The regional wellfield will cost approximately $14,000,000 and the transmission lines will cost approximately S19.000,000. An additional S2,000,000 will be needed to complete construct on and these funds will be raised through the rate structure. In order to determine the proposed wellfield's impacts upon the potentiometric surface, water table and lake stages, the parties in this proceeding utilized information gathered from literature, pump tests, computer modeling and hand-calculated modeling to predict the drawdowns expected during periods of average and maximum pumping. While the actual numerical drawdown 1evels anticipated vary greatly among the expert witnesses presented, it is clear that the wellfield withdrawals, after pumping for 30 days at 24 mgd, will lower the potentiometric surface by more than 5 feet at the boundary of a one-acre well site and that the 5-foot drawdown contour will extend at least 2 1/2 miles radially around the center of the wellfield . The water table level will not be lowered more than three feet at the boundaries of the one-acre tracts, surface waters of lakes and impoundments will not be lowered more than one foot, and the potentiometric surface will not be lowered below sea level. Withdrawals from the wellfield will not induce salt water encroachment. When utilizing computer modeling to predict the impacts from withdrawals, it is essential to understand the site-specific geology and aquifer characteristics of the area. After studying the literature on the area of the wellfield, examining well logs and geophysical logs and conducting a well inventory in a 5-mile area across the wellfield, Gardinier's hydrogeologlsts found the area to be nonisotroptc and calibrated their modeling to account for the changes in geology throughout the area. The area of 'he proposed wellfield was fond to contain a thick clay confining layer which allows less water to permeate it. Inasmuch as less water moves through the layers to recharge the aquifer, the cone depression created by withdrawals from the wellfield extends over a larger and deeper area. Utilizing a value for leakance (defined as the vertical permeability through which water flows from the upper aquifer through a confining layer into the lower aquifer) of 1 x 104. Gardinier's experts predict that the potentiometric surface drawdown at Lithla Springs when the wellfield is pumping 24 mgd for 30 days will be about one foot under normal conditions. During a drought, the drawdown in the Floridan aquifer at Lithia Springs could be as much as 18.9 feet. The effects would, of course, be greater during pumpage rates of 45 mgd. During drought conditions, and possibly also when the wellfield is operating at maximum withdrawal rates, Gardinier may well have difficulty pumping water from Lithia Springs in the amounts for which it is seeking a permit. Various methodologies demonstrate that the potentiometric surface drawdown in the center of the proposed wellfield will be from 20 to 6G feet, depending upon the pumpage amounts and seasonal conditions. Such drawdown levels can interfere with existing wells in the area. Also, a lowering of the potentiometric surface could potentially lead to catastrophic collapse or subsidence in the area of the wellfield. The area is karstic in nature, with solution features such as sin);holes and springs present. Rapid ground collapses can occur in such areas due to a loss in the bearing strength of the unconsolidated material that fills the solution features. Such collapses have been associated with large withdrawals of water from pumping, thus creating extensive drawdowns, followed by a heavy rain. because of the particular geologic and aquifer characteristics of the wellfield area and the potential for interference with existing users, there should be a controlled maximum amount of water development in this area, along with observation wells and extensive monitoring of the various aquifer systems. In order to justify an exception to the District's rule that withdrawals not lower the level of the potentiometric surface more than five feet, the Authority proposes a mitigation program which it utilizes in other wellfields operated by it. This after-the-fact mitigation program consists of receiving complaints, sending a field representative to conduct an on-site investigation to determine the nature and cause of the problem, and sending a letter to the complainant and to SWFWMD documenting the results of the investigation. If the .authority determines that its wellfield operation caused the problem, if it takes mitigative action, such as reimbursing the complainant, hiring a contractor to solve the problem, or refurbishing or replacing the complainant's well or pumping equipment. The Authority also proposes various alternative mitigative actions if the wellfield affects Gardinier's ability to withdraw a sufficient quantity of water from Lithia Springs. These include the construction of new wells at Lithia Springs or along Gardinier's transmission pipeline, lowering the intake system at the springs and supplying Gardinier with water from the wellfield on an emergency basis. These suggested alternatives have not been fully investigated with regard to the effect upon the springs and fail to take into account the economic repercussions to Gardinier should it be unable to supply fresh water for the plant's operation while the Authority is investigating the problem and/or implementing the solution. The SWFWMD has proposed a before-the-fact mitigation plan for landowners living within one-half mile of each well site. This preventative mitigation plan would require the Authority to conduct a detailed water well inventory of all property owners located within one-half mile of the withdrawal point of each production well when the sites are finally selected. The Authority is to review each well's depth, casing size and depth, pump type and depth and the static water level, and then determine whether each well will be adversely affected with regard to its intended use. If so, the Authority is to commence its mitigative actions prior to or during construction of its production well. If an adverse effect is determined during testing of any production well, the Authority is to commence mitigative action prior to withdrawing water for public supply. The mitigative actions for impacted wells are to include well deepening, lowering or replacement of pumping facilities or whatever action is required to maintain an adequate water supply. The five-foot potentiometric surface drawdown contour extends beyond one-half mile during certain scenarios of pumping or seasonal conditions. The .Authority has been operating Well 1 as a test well under a temporary CUP, and has received six complaints from private well owners in the vicinity regarding water levels. No corrective action has been taken with regard to these complaints. With the exception of some phosphate mining cuts and small farm ponds, there are no significant lakes or other impoundments in the area of the proposed wellfield. It is anticipated that such water bodies will be affected by less than one foot by withdrawals from the wellfield. The greatest water table drawdown predicted is 2.8 feet at the center of the wellfield, where there are no open bodies of water. The area is culturally impacted now and is not ecologically sensitive. Vegetative species in the area are able to adapt to a wide range of soil moisture situations, and a less than one-foot reduction in the water table should not adversely or significantly affect vegetation in the area. Operation of the proposed wellfield at the requested rates of withdrawal will have no effect upon Buckhorn Springs or the East Tampa Chemical Plant. Intervenor Hebbard's private well is located between Well l in the proposed wellfield and Lithia Springs. He is concerned that the proposed wellfield will adversely affect land values in the area and the quantity and quality of his water withdrawals. He is also concerned with the potential for terrorist activity in a centralized water supply source and feels that the location of the proposed wellfield will not benefit existing Florida residents. The Lithia-Pinecrest Civic Association is not incorporated and has no membership list or bylaws. Its 47 years, uses the Alafia River for fishing and boating and is that the proposed wellfield will adversely affect his well and pumping facilities without adequate or timely mitigation and that the wellfield will remove the very resource for which the area is zoned: to wit: agicultural. Intervenor A. H. Varnum resides in the area of the proposed wellfield and also operates his business, Central Maintenance and Welding, Inc, in that area. He is concerned that the wellfield will adversely affect his water supply without sufficient mitigation. He is further concerned about the social impact of permitting a wellfield in this area when the water withdrawn will not benefit the persons who reside there. Intervenor I. A. Albritton was in attendance throughout the hearing. He was born in the area and now resides near Wel1 He has noticed odors, ground vibrations and decreasing water levels when Well 1 is pumping. He is concerned with dropping water table levels and the general condition of the land in the area.

Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that: CUP Number 7C01530 be ISSUED to Cardinier for its salt water wells at the East Tampa Chemical Plant for a period of two years an average annual and maximum daily withdrawal rates of 31,968,000 gallons per day: CUP Number 7601532 be ISSUED to Gardinier for spring withdrawals from Buckhorn Springs for a period of six years at average annual and maximum daily withdrawal rates of 1,.40,000 gallons per day, with the condition that total discharge from the spring pool be recorded on a daily basis and reported to the SWFWMD on a monthly basis, and that continuous recording gages be placed to monitor spring flow, spring height and pumpage. CUP Number 7601533 be ISSUED to Gardinier for spring and groundwater withdrawals from Lithia Springs for a period of six years at an average annual withdrawal rate of 5,822,000 gallons per day and a maximum combined withdrawal rate not to exceed 5,904,000 gallons during a single day, with the following conditions: that Gardinier cease utilizing its existing pressure relief system and develop an alternate system for withdrawing sprirlg water only in the amounts actually required, and that total discharge from the spring pool be recorded on a daily basis and reported to the SWFWMD on a monthly basis, and that continuous recording gages be placed to monitor spring flow, spring height and pumpage; and CUP Number 204352 be ISSUED to the West Coast Regional water Supply Authority and Hillsborough County for a period of six years, such permit to consolidate prior permits for approximately 75 existing wells used for public water supply and to construct and operate a regional wellfield containing 17 production wells, with total combined average withdrawal rates of 24 ,100, 000 gallons per day and a total maximum combined withdrawal rate not to exceed 44,600,000 gallons during a single day, with the following conditions, as amplified in the above conclusions of law: that pre-development hydrologic conditions at the wellfield, particularly at each well site, continue to be monitored by the Authority; that a report be submitted to the SWFWMD summarizing the planned schedule for retiring each of the existing wells and the schedule for the phased production of water from each wellfield well; that a written mitigation policy be submitted to the SWFWMD and incorporated as a condition of the permit, said policy to contain adequate measures to eliminate interference without interruption of presently existing legal uses, as suggested by the SWFWMD and including those users who will be affected by a potentiometric surface level drawdown exceeding five feet and Galdinier's withdrawals from Lithia Springs; and that, once production at the wellfield reaches a level of 15,000,000 gallons per day, the Authority will notify the SWFWMD staff and engage in a joint review of the hydrologic monitoring results of pumpage at that .ate and a joint determination of the future pumping scenario. The conditions recommended herein are intended to be inclusive only, and not exclusive of other customary permit terms and conditions nor of those conditions suggested by the SWFWMD in its proposed CUPs Numbers 201530, 201532, 201533 and 204352. Respectfully submitted and entered this 11th day of July, 1986, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904 ) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of July, 1986. COPIES FURNISHED: Edward P. de la Parte, Jr., Esquire Edward M. Chew, Esquire de la Parte, Gilbert & Gramovot, P.A. 705 E. Kennedy Boulevard Tampa, Florida 3360- Roger W. Sims, Esquire Julia Sullivan Waters, Esquire Holland & Knight P. O. Drawer BW Lakeland, Florida 33802 and 600 N. Florida Avenue Tampa, Florida 33602 J. Edward Curren, Esqulre Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 33512-9712 L. M. Blain, Esquire Charles G. Stephen Esquire Anita C. Brannon, Esquire Blain & Cone, P.A. 202 East Madison Street Tampa, Florida 33602 George M. Hebbard, Jr. Route 3, Box 430 Lithla, Florida 33547 Gary W. Kuhl, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 33512-9712

# 1
SAVE THE MANATEE CLUB, INC., vs SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 99-003885RX (1999)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Sep. 17, 1999 Number: 99-003885RX Latest Update: Feb. 23, 2001

The Issue Whether Save the Manatee Club has standing in this proceeding? Whether the exemptions in paragraphs (3), (5) and (6) of Rule 40D-4.051, Florida Administrative Code, (the Exemptions) are "invalid exercises of delegated legislative authority" as defined in paragraphs (b) and (c) of Section 120.52(8), Florida Statutes? Whether the Exemptions violate the prohibitions and restrictions on agency rulemaking contained in the last four sentences of Section 120.52(8), Florida Statutes?

Findings Of Fact The parties Petitioner, Save the Manatee Club, Inc., is a not-for- profit corporation dedicated to protecting the manatee. Respondent, The Southwest Florida Water Management District, is one of five water management districts in the State of Florida. A public corporation created pursuant to Chapter 61- 691, Laws of Florida, the District's geographic boundaries encompass a number of counties or some part of them including the three counties on the shores of Tampa Bay: Hillsborough, Pinellas and Manatee. See Section 373.069(2)(d), Florida Statutes. Within this boundary, the District is generally charged with the protection of water resources and with the management and storage of surface waters of the State pursuant to Part IV, Section 373.403 et seq., Florida Statutes. Intervenor, South Shores Properties Partners, Ltd., is a limited partnership composed of a subsidiary of Tampa Electric Company (TECO) and another business organization, Shimberg Cross Company, referred to by its President Glen Cross as "actually SCSS" (Tr. 133), apparently an acronym for Shimberg Cross Company. Mr. Cross' company is the general partner in the South Shores partnership. South Shores was formed in anticipation of closing on a contract entered by Shimberg Cross to purchase a parcel of real estate in Hillsborough County. The closing proceeded in January of 1998. On January 23, 1998, eight days or so before the closing, South Shores was formed as "a limited partnership organized under the laws of the State of Florida." (Petitioner's Exhibit no. 15). It succeeded to the contract rights of Shimberg Cross and then, pursuant to the closing, became the owner of the real estate subject to the contract. South Shores hopes to sell the property to Atlantic Gulf Communities, an organization that will actually develop it. If the arrangement with Atlantic Gulf Communities is not consummated, South Shores will look for another developer or develop the property itself. No matter what party (if any) is the actual developer, South Shores, as the present owner, now seeks the benefit of the Exemptions in support of a District- issued conceptual permit for development of the parcel in Hillsborough County (the Parcel). The Parcel and Its Proposed Development The Parcel is 720 acres in southwestern Hillsborough County. South Shores proposes to use it for a multi-phase, mixed-use project. The development project is denominated "Apollo Beach aka (sic) Bay Side" (Petitioner's Exhibit 13) on the draft of the conceptual permit attached to the District's Notice of Proposed Agency Action. Atlantic Gulf Communities calls it "Harbor Bay". (Petitioner's Exhibits 3 and 4). (It will be referred to in this order as Apollo Beach/Bay Side). If all goes as planned by South Shores, the Parcel's developer (whether South Shores, Atlantic Gulf Communities, or some other party) will be able to provide the residential portion of Apollo Beach/Bay Side with direct access by boat to Tampa Bay through an existing canal system on the Parcel. For now access to the bay is blocked by an earthen berm or "plug." With the plug in place, boat access to the bay from the canals can only be achieved by means of a boat lift. A lagoon is also part of South Shores' development plans for Apollo Beach/Bayside. Not yet excavated, the lagoon will allow residents to harbor boats close to their residences. If the lagoon is dug, a boat lift (different from the one necessary to allow boats to cross the plug if left in place) will be constructed to give the boats access to the canal system. With access to the canal system established, once the plug is removed, the boats will have unrestricted access to Tampa Bay. In the "Abstract" section of the conceptual permit proposed for issuance by the District, the project was described as follows: Apollo Beach (a.k.a. Bay Side) is a proposed multi-phase, mixed use development on approximately 720.0 acres in . . . Southwestern Hillsborough County. The project will include single-family and multi- family residential areas and commercial sites. The property is in close proximity to Tampa Bay, West of U.S. Highway 41 and immediately south of the existing Apollo Beach development. The site is presently undeveloped but does contain an existing manmade canal system that is tidally connected to Tampa Bay. The Applicant has demonstrated that the proposed project has an Environmental Resource Permit exemption pursuant to Chapters 40D-4.051(3)(5) and (6), F.A.C. and will only require Standard General Permits for Minor Surface Water Management Systems for the future construction in accordance with Chapter 40D-4.041(4), F.A.C. Because of this exemption, this Conceptual Permit will only review the storm water quality aspects of the project in accordance with 40D-301(2) and will not address storm water quantity issues or impacts to wetland/fish and wildlife habitats. The project will include the realignment of existing Leisley Road and the construction of a roadway system to serve the proposed residential and commercial areas. The project will also include the excavation of a "fresh water Lagoon" approximately 136 acres in size. Most of the proposed single-family residential lots will be constructed on the "Lagoon" or existing canal system. Surface water runoff from the upland portions of the project will be treated in 25 proposed ponds or isolated wetlands prior to discharge to the "Lagoon" or existing canal system. (Petitioner's Exhibit no. 13.) The ultimate effects to manatees of the proposed development project, if completed, were described by Ms. Thompson, the Club's witness: A typical project such as this one will introduce a good number of powerboats into the system, in this case, Tampa Bay. And manatees are impacted by powerboats either through propeller injuries or through collision with the hull of a fast-moving boat and the results are either death or in some cases sublethal injuries that may have other consequences such as inability to reproduce, et cetera. . . . [T]he very same boats can affect manatee habitat by prop scarring, boats going over sea grass beds and destroying the grasses. They also, in shallow water, kick up . . . turbidity which can affect light attenuation reaching the sea grass beds. And then there are the water quality issues which have secondary impacts to the sea grass beds . . . (Tr. 96). The Exemptions preliminarily afforded South Shore by the District will allow the removal of the plug in the canal system. Because removal of the plug will facilitate access to Tampa Bay by power boats harbored in the lagoon, it is the issue about the development of the Parcel that most concerns the Club in its efforts to protect manatees in Tampa Bay and elsewhere. Standing of Save the Manatee Club (i). The Manatee The manatee is the "Florida State marine mammal." Section 370.12(2)(b), Florida Statutes. Designated an endangered species under both federal and state law, 50 CFR s. 17.11 and Rule 39-27.003, Florida Administrative Code, the manatee is protected by the federal Endangered Species Act and by the federal Marine Mammal Protection Act. In Florida, the manatee enjoys, too, the protection of the Florida Endangered Species Act and the Florida Manatee Sanctuary Act. The State of Florida has been declared to be "a refuge and sanctuary for the manatee." Id. The Club's Purpose and Activities The Club's primary purpose is to protect the manatee and its habitat through public awareness, research support and advocacy. Long active in efforts to protect the manatee, the Club has achieved special status in manatee protection in Florida. In 1996, it was the recipient of a resolution by the Florida Legislature's House of Representative recognizing its endeavors on behalf of the manatee. The Club has been designated a member of the Manatee Technical Advisory Council provided by the Florida Manatee Sanctuary Act. See sub-sections (2)(p) and (4)(a) of section 370.12(2)(p) and (4)(a), Florida Statutes. The Department of Environmental Protection annually solicits recommendations from the Club regarding the use of Save the Manatee Trust Fund monies. In furtherance of its efforts, the Club has frequently participated before the Division of Administrative Hearings in administrative litigation involving manatees and manatee habitat on behalf of itself and its members. (iii). The Club's Membership The Club has approximately 40,000 members. The number of individual persons who are members of the Club, however, is far in excess of this number because many members are groups that receive membership at discounted fees. For example, a family may be one member or, as is quite common, an entire elementary school classroom may be one member. One-quarter of the Club's membership resides in Florida. Approximately 2,200 of the members are on the west coast of Florida with 439 in Hillsborough County, 584 in Pinellas and 165 in Manatee. The total number of members is therefore about 1,188 in the three counties whose shores are washed by Tampa Bay. (iv). Tampa Bay Tampa Bay is "prime essential manatee habitat." (Tr. 65). At least two factors make this so: the Bay's sea grass beds (manatee feeding areas) and warm water sources, particularly in winter, three of which are "power plant effluence." (Tr. 77). Not surprisingly, therefore, the Club has funded long- term research on the manatee in Tampa Bay. It has "provided about ten years of financial support for aerial surveys to count manatees in Tampa Bay and determine their distribution and the health of the sea grass beds . . ." (Tr. 75), a research project which finished last year. This research has contributed to other manatee research in the Bay leading the Club's witness at hearing to conclude, "[t]here's no other place in the state of Florida that has as long a term, as comprehensive a [manatee] database as Tampa Bay." (Tr. 76). Other activities in Tampa Bay conducted by the Club include the placement of manatee awareness signs. And the Club's staff biologist sits on the Tampa Bay Manatee Awareness Coalition established by the Tampa Bay National Estuary Program. In sum, the quality of manatee habitat in Tampa Bay is enough to make it especially important to the Club. But, its importance to the Club takes on added significance because it is the site of one of only three adoption programs the Club sponsors in Florida. The Tampa Bay Adoption Program The Tampa Bay Adopt-a-Manatee Program was established in April of 1999. The six manatees subject to the Tampa Bay Manatee Adoption Program (as of October 7, 1999) have been adopted by 1,229 members, 284 of which have been schools. (Petitioner's Exhibit 9). Those adopting receive a photo of the manatee, a biography, a scar pattern sheet, and a map showing their manatees' favorite habitat areas along the west coast of Florida. Of the six "Tampa Bay Adoption" program manatees, five have been seen in Tampa Bay and one south of Tampa Bay in the Marco Island area. Of the five seen in the bay, four "winter at the warm water discharge area of Tampa Electric Company's power plant" (Petitioner's Exhibit No. 5, Tr. 67) where they can be observed by members of the Club and the Tampa Bay adoption program as well as by the public. The TECO Power Plant The TECO power plant area is the major warm water refuge for manatees known to frequent Tampa Bay, particularly during the winter. The waters near the plant have been observed to be the host of more than 100 manatees at one time, following the movement of cold fronts through the area. The plant has a manatee-viewing center, one of the two principal places in the state for viewing manatees in the wild. The Club's membership handbook gives detailed information about how to see manatees at the TECO viewing center. During the winter months, the Club frequently directs its members to the TECO viewing center. Precisely how many individuals, either as members of the Club through a group membership or as members, themselves, actually have viewed manatees at the TECO viewing center or elsewhere in Tampa Bay was not established. Nor was any competent estimate made of how many might visit the TECO viewing center in the future. The viewing center and the power plant are in the vicinity of Apollo Beach/Bay Side, the development project South Shores seeks to have approved for an Environmental Resource Permit (the ERP). The SWFWMD ERP Program Chapter 373, Florida Statutes, governs water resources in the state and sets out the powers and duties of the water management districts, including their permitting powers. Part IV of the chapter covers the management and storage of surface waters. According to SWFWMD rules, "'Environmental Resource Permit' means a conceptual, individual, or general permit for a surface water management system issued pursuant to Part IV, Chapter 373, Florida Statutes." Rule 40D-4.021, Florida Administrative Code. The permit issued to South Shores in this case through the application of the challenged Exemptions, is a conceptual Environmental Resource Permit. See Petitioner's Exhibit no. 13 and Rule 40D-4.021(2), Florida Administrative Code. The conceptual permit preliminarily issued South Shores is one that was reviewed by the Club's staff, just as it reviews many permit applications for potential effects to manatees. Because of use of the Exemptions as proposed by the District to South Shores, however, any review the Club conducted to assure that the permit met all general permitting criteria was of no use. Much of those criteria were not applied by the District to the application. If the Exemptions were not available to South Shores, the District would have to employ ERP permitting criteria to the surface water management activities associated with the development project, including removal of the plug, lagoon construction, and boat lift installation. The Exemptions, therefore, keep the Club from participating in what otherwise would be the process for the District's administrative decision on the application of those criteria. In sum, the Exemptions preempt the Club's participation in the state mechanism provided by ERP permitting criteria for assessing, inter alia, threats to the manatee and its habitat from harms associated with the proposed development project. The District recognized this effect of the permit in the draft of the permit. The draft states: "Because of this Exemption, this Conceptual Permit will . . . not address . . . impacts to . . . wildlife habitat." (Petitioner's Exhibit no. 13). The Exemptions, therefore, prevent the Club from carrying out functions useful to protection of manatee habitat, that is, participation in the District's application of wildlife habitat protection criteria. The non-application by the District of permit criteria related to wildlife habitat protection and the Club's inability to assure itself that the criteria are correctly applied poses the danger that manatee habitat will be lost, diminished or damaged. If the Club is ultimately proved right in its assertion that the manatee and its habitat will be damaged by the South Shores development without application of permitting criteria related to wildlife habitat, then the approved application increases the threat that Club members will encounter greater difficulty in observing, studying and enjoying manatees in the wild and in Tampa Bay in particular. Standing of South Shores to Intervene The District has no opposition to South Shores' intervention. As for the Club's position with regard to South Shores intervention, the Club stipulated to South Shores' standing to intervene in a notice filed with its proposed order. South Shores benefits, moreover, from the application of the Exemptions to its proposed project. In light of not having to show compliance with permitting criteria otherwise applicable, South Shores will escape some permitting costs and therefore, enjoys economic benefit. Furthermore, by allowing South Shores to avoid the requirements of compliance with ERP permitting criteria, the Exemptions facilitate fulfillment of the obligation of South Shores to obtain a permit to develop. The District's Rule-making Authority The District governing board has been granted general authority by the Legislature to adopt rules to implement the provisions of Chapter 373, Florida Statutes, the Florida Water Resources Act of 1972: The governing board of the district is authorized to adopt rules . . . to implement the provisions of law conferring powers or duties upon it. Section 373.113, Florida Statutes. The Legislature has framed this authority in relationship to the District's power to administer the Chapter and its Part IV: In administering the provisions of this chapter the governing board has authority to adopt rules . . . to implement provisions of law conferring powers or duties upon it. Section 373.113, Florida Statutes. In another provision in Chapter 373, the district has been given rule-making authority that exceeds the authority to implement specific provisions granted typically to most administrative agencies in Florida. This authority is broad indeed. Tied to water use in general, it is bound only by unspecified conditions as warranted: . . . governing boards, . . . may: Adopt rules . . . affecting the use of water, as conditions warrant, . . . Section 373.171, Florida Statutes. The Exemptions; Specific Authority and Laws Implemented The Exemptions are as follows: 40D-4.051 Exemptions. The following activities are exempt from [ERP] permitting under this chapter: * * * (3) Any project, work or activity which has received all governmental approvals necessary to begin construction and is under construction prior to October 1, 1984. *(4) Any project, work or activity which received a surface water management permit from the District prior to October 1, 1984. * * * Any phased or long term buildout project, including a development of regional impact, planned unit development, development with a master plan or master site plan, or similar project, which has received local or regional approval prior to October 1, 1984, if: The approval process requires a specific site plan and provides for a master drainage plan approved prior to the issuance of a building permit, and The Developer has notified the District of its intention to rely upon this exemption prior to April 1, 1985. Projects exempt under this subsection shall continue to be subject to the District's surface water management rules in effect prior to October 1, 1984. As specific authority, the Rule containing the Exemptions references 373.044, 373.113, 373.149, 373.171, and 373.414(9), Florida Statutes. For "Law Implemented", the Rule lists Sections 373.406, 373.413 and 373.414(9), Florida Statutes. Section 373.414(9) is cited by the Rule both as specific authority and as one of the laws implemented. The first of the statutory provisions cited by the Rule as a law implemented is Section 373.406, Florida Statutes. It reads: 373.406 Exemptions.- The following exemptions shall apply: Nothing herein, or in any rule, regulation, or order adopted pursuant hereto, shall be construed to affect the right of any natural person to capture, discharge, and use water for purposes permitted by law. Nothing herein, or in any rule, regulation, or order adopted pursuant hereto, shall be construed to affect the right of any person engaged in the occupation of agriculture, silviculture, floriculture, or horticulture to alter the topography of any tract of land for purposes consistent with the practice of such occupation. However, such alteration may not be for the sole or predominant purpose of impounding or obstructing surface waters. Nothing herein, or in any rule, regulation, or order adopted pursuant hereto, shall be construed to be applicable to construction, operation, or maintenance of any agricultural closed system. However, part II of this chapter shall be applicable as to the taking and discharging of water for filling, replenishing, and maintaining the water level in any such agricultural closed system. This subsection shall not be construed to eliminate the necessity to meet generally accepted engineering practices for construction, operation, and maintenance of dams, dikes, or levees. All rights and restrictions set forth in this section shall be enforced by the governing board or the Department of Environmental Protection or its successor agency, and nothing contained herein shall be construed to establish a basis for a cause of action for private litigants. The department or the governing board may by rule establish general permits for stormwater management systems which have, either singularly or cumulatively, minimal environmental impact. The department or the governing board also may establish by rule exemptions or general permits that implement interagency agreements entered into pursuant to s. 373.046, s. 378.202, s. 378.205, or s. 378.402. Any district or the department may exempt from regulation under this part those activities that the district or department determines will have only minimal or insignificant individual or cumulative adverse impacts on the water resources of the district. The district and the department are authorized to determine, on a case-by- case basis, whether a specific activity comes within this exemption. Requests to qualify for this exemption shall be submitted in writing to the district or department, and such activities shall not be commenced without a written determination from the district or department confirming that the activity qualifies for the exemption. Nothing in this part, or in any rule or order adopted under this part, may be construed to require a permit for mining activities for which an operator receives a life-of-the-mine permit under s. 378.901. Certified aquaculture activities which apply appropriate best management practices adopted pursuant to s. 597.004 are exempt from this part. For the most part, this section sets out general classes of exemptions. And it allows the District to consider whether an activity comes within an exemption on a "case-by-case" basis. See Section 373.406(6), Florida Statutes. But, none of these "exemptions" appear to have anything to do with the grandfather protections provided by the Exemptions at issue in this proceeding. See paragraphs 93-96, below. Section 373.413, Florida Statutes, in pertinent part, reads: (1) Except for the exemptions set forth herein, the governing board or the department may require such permits and impose such reasonable conditions as are necessary to assure that the construction or alteration of any stormwater management system, dam, impoundment, reservoir, appurtenant work, or works will comply with the provisions of this part and applicable rules promulgated thereto and will not be harmful to the water resources of the district. The department or the governing board may delineate areas within the district wherein permits may be required. Other than to make reference in subsection (1)to the existence of exemptions under Part IV of Chapter 373: "Except for the exemptions set forth herein . . .", Section 373.413 does not deal at all with exemptions. Certainly, it does not make reference with any specificity to the subject matter of the Exemptions at issue in this proceeding. Cited both as "specific authority" and "law implemented" is paragraph (9) of Section 373.414, Florida Statutes. Unlike Sections 373.406 and 373.413, it has a connection to the Exemptions at issue in this proceeding as is seen from perusal of the underscored language, below: (9) The department and the governing boards, on or before July 1, 1994, shall adopt rules to incorporate the provision of this section, relying primarily on the existing rules of the department and the water management districts, into the rules governing the management and storage of surface waters. Such rules shall seek to achieve a statewide, coordinated and consistent permitting approach to activities regulated under this part. Variations in permitting criteria in the rules of individual water management districts or the department shall only be provided to address differing physical or natural characteristics. Such rules adopted pursuant to this subsection shall include the special criteria adopted pursuant to s. 403.061(29) and may include the special criteria adopted pursuant to s. 403.061(35). Such rules shall include a provision requiring that a notice of intent to deny or a permit denial based upon this section shall contain an explanation of the reasons for such denial and an explanation, in general terms, of what changes, if any, are necessary to address such reasons for denial. Such rules may establish exemptions and general permits, if such exemptions and general permits do not allow significant adverse impacts to occur individually or cumulatively . . . (emphasis supplied.) History of the Exemptions The Exemptions have been adopted twice and amended several times. One of the amendments and the second adoption followed omnibus legislation in the environmental permitting arena: the amendment in the wake of the passage of the Warren S. Henderson Wetlands Protection Act of 1984, and the second adoption in the aftermath of the Florida Environmental Reorganization Act of 1993. (i). Amendment after the Henderson Act The Warren S. Henderson Wetlands Protection Act of 1984, (the "Henderson Act", later codified as Part VII of Chapter 403, Florida Statutes) was enacted through Chapter 84-79, Laws of Florida. Approved by the Governor on June 1, 1984 and filed in the Office of the Secretary of State on the same day, (see Laws of Florida, 1984, General Acts, Vol.1, Part One, p. 224) the Act had an effective date of October 1, 1984. The Henderson Act does not amend any provision in Part IV of Chapter 373, Florida Statutes, the part of the Water Resources Act which delineates water management district authority over the program for permitting related to the management and storage of surface waters ("MSSW"). Nonetheless, between the adoption of the Henderson Act and its effective date, the District amended and adopted rules in Chapters 40D-4 and 40D-40 of the Florida Administrative Code because of the Act's passage. Rule 40D-4.011 set out the policy for the amendments and adoptions: (2) The rules in this chapter implement the comprehensive surface water management permit system contemplated in part IV of Chapter 373, Florida Statutes. As a result of the passage of Chapter 84-79, Laws of Florida, the Warren G. Henderson Wetlands Protection Act of 1984, the District has adopted the rules in this Chapter and Chapter 40D-40 to ensure continued protection of the water resources of the District including wetlands and other natural resources. (Exhibit OR 4, See the page containing paragraph (2) of Rule 40D- 4.011 in the exhibit.) /1 Exhibit OR 4, a document officially recognized during this proceeding, is denominated "SWFWMD's Rule Amendment No. 116." The exhibit contains a letter on SWFWMD letterhead, signed by Dianne M. Lee for "J. Edward Curren, Attorney - Regulation" dated September 5, 1984. Under cover of the letter is a rule package filed by the District with the Secretary of State on September 11, 1984. Included in the package is the newly amended Rule 40D-4.051. The amended 40D-4.051 contains subparagraphs (3), (5) and (6), the Exemptions challenged in this proceeding. They are worded precisely as they remain worded today. Consistent with the policy expressed in Rule 40D-4.011, Florida Administrative Code as filed in September of 1984, the effective date of the amendment to the Rule containing the Exemptions was the effective date of the Henderson Act: October 1, 1984. The Exemptions contained in the amendment filed in September of 1984 are "grandfather provisions." The first two are designed to protect certain projects, work or activities from the requirements of the Henderson Act if they had governmental approvals on October 1, 1984. The third is designed to protect from the Act "phased or long term buildout project[s]" that meet certain requirements, among them receipt of governmental approvals by October 1, 1984. At the time of the 1984 amendments, the Rule cited to Sections 373.044, 373.113, 373.149 and 373.171 for "Specific Authority," that is, the statutory source for the district's authority to make rules. For "Law Implemented" the Rule cited to Section 373.406, Florida Statutes. At that time, Section 373.406 contained only four subsections. These four are worded substantially the same as the first four subsections of the section today. Although Section 373.406 was the only law implemented by the Rule in 1984, the section is neither mentioned in nor part of the Henderson Act. The section, itself, does not make mention of the Henderson Act or of protection from it based on government approvals obtained by October 1, 1984. Section 373.406, Florida Statutes, in its form both immediately before and after the Henderson Act provided exemptions that appear to have nothing to do with the Exemptions challenged in this proceeding. The only connection between Section 373.406, Florida Statutes, in 1984 and the Exemptions at issue in this proceeding when amended into the Rule in 1984 appears to be the use of the term "exemptions." The exemptions set out in the Section 373.406, Florida Statutes, as it existed in 1984, are not related to grandfather protection from the effects the Henderson Act had on the District's permitting considerations. Following the amendment to the Rule containing the Exemptions, the Rule was amended further. It was amended on October 1, 1986, March 1, 1988, and January 24, 1990. None of these amendments appear to have affected the Exemptions under consideration in this proceeding. The Rule became the subject of rule promulgation by the District again, however, as a result of a second omnibus act of the Legislature in the environmental permitting arena, the Florida Environmental Reorganization Act of 1993. (ii). The Reorganization Act of 1993 Nine years after the passage of the Henderson Act, the Legislature enacted the Florida Environmental Reorganization Act of 1993 (the "Reorganization Act"). Passed as Chapter 93-213, Laws of Florida, the Session Law declares its underlying policy: Declaration of Policy.-- The protection, preservation, and restoration of air, water, and other natural resources of this state are vital to the social and economic well-being and the quality of life of the citizens of this state and visitors to this state. It is the policy of the Legislature: To develop a consistent state policy for the protection and management of the environment and natural resources. To provide efficient governmental services to the public. To protect the functions of entire ecological systems through enhanced co- ordination of public land acquisition, regulatory, and planning programs. To maintain and enhance the powers, duties, and responsibilities of the environmental agencies of the state in the most efficient and effective manner. To streamline governmental services, providing for delivery of such services to the public in a timely, cost-efficient manner. Section 2., Ch. 93-213, Laws of Florida. The Reorganization Act carried out this policy in a number of ways. Among these, it merged the Departments of Environmental Regulation (DER) and Natural Resources into the Department of Environmental Protection. In so doing and at the same time, it incorporated DER's dredge and fill permitting program instituted by the Henderson Act into the programs of the water management districts for the Management and Storage of Surface Waters (MSSW). The permitting program that resulted from the consolidation of DER's dredge and fill permitting program with the District's MSSW permitting program is what has been referred to in this order as the Environmental Resource Permitting or ERP program. With regard to rules under the new ERP program, the Reorganization Act amended Section 373.414, Florida Statutes. Two sentences in subsection (9) of the amended section bear repeating: The department and the governing boards [of the water management districts], on or before July 1, 1994, shall adopt rules to incorporate the provisions of this section, relying primarily on the existing rules of the department and the water management districts, into the rules governing the management and storage of surface waters. * * * Such rules may establish exemptions . . . if such exemptions . . . do not allow significant adverse impacts to occur individually or cumulatively. . . . As discussed earlier in this order, the Henderson Act did not directly create exemptions in the District's MSSW permitting program. Nonetheless, the District through the Exemptions of Rule 40D-4.051, Florida Administrative Code, provided "grandfather" protections in the wake of the Act effective October 1, 1984. Whereas grandfather concerns were raised in front of the District after the Henderson Act, grandfather concerns and concerns about other situation that should be entitled to exemptions were raised to the Legislature during the advent of the Reorganization Act. These concerns were addressed in the Florida Environmental Reorganization Act, itself. The Act provided specific exemptions that were self- executing. Included were ones providing grandfather protection for certain activities approved under Chapter 403, Florida Statutes, (DER's dredge and fill program) from imposition of new ERP permitting criteria expected to be promulgated in the wake of the Reorganization Act. The are contained in subsections (11) through (16) of Section 373.414, Florida Statutes. None of these exemptions make reference to the Exemptions at issue in this case. Of these provisions, only one addresses activities subject to rules adopted pursuant to Part IV of Chapter 373 prior to the anticipated ERP permitting criteria: An application under this part for dredging and filling or other activity, which is submitted and complete prior to the effective date of [the anticipated ERP rules] shall be reviewed under the rules adopted pursuant to this part [including the Exemptions in Rule 40D-4.051] and part VIII of chapter 403 in existence prior to the effective date of the [anticipated ERP rules] and shall be acted upon by the agency which received the application, unless the applicant elects to have such activities reviewed under the [anticipated ERP rules]. Chapter 93-213, Section 30, p. 2149 of Laws of Florida, 1993, General Acts, Vol. 1, Part Two, now Section 373.414(14), Florida Statutes. 2/ Rule Activity in 1995 In observance of the mandate in the first section of Section 373.414(9), Florida Statutes, the District undertook adoption of rules "to incorporate the provisions of [Section 373.414] . . . into the rules governing the management and storage of surface waters." These rules were the ERP rules anticipated by the Reorganization Act. They included the rules necessary for the District to administer under its ERP program its newfound authority over much of the dredge and fill permitting program formerly administered by DER and now consolidated with its permitting authority in its MSSW rules. Among the rules passed under the authority of the Reorganization Act's Section 373.414(9) is Rule 40D-4.051, the Rule containing the Exemptions subject to this proceeding. Filed with the Secretary of State on September 13, 1995, the adoption package for the new readopted states the following, in pertinent part: 40D-4.051 Exemptions The following activities are exempt from permitting under this chapter [Individual ERPs]: (1) - (7) - No change. (Exhibit OR 6, p. 14). The result of this adoption is that the Exemptions became part of the District's ERP Rules. They now apply to both the MSSW authority under Part IV, Chapter 373, Florida Statutes, which existed prior to the Reorganization Act, and, in a consolidated fashion, the District's authority conferred by the Reorganization Act to regulate certain dredge and fill activity formerly regulated by DER.

CFR (1) 50 CFR 17.11 Florida Laws (24) 120.52120.536120.54120.56120.569120.57120.6817.11373.044373.046373.069373.113373.149373.171373.403373.406373.413373.414378.202378.205378.402378.901403.061597.004 Florida Administrative Code (3) 40D-4.02140D-4.04140D-4.051
# 2
MANASOTA-88, INC. vs LAND TRUST NO. 97-12 AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 14-005038 (2014)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Oct. 23, 2014 Number: 14-005038 Latest Update: Apr. 10, 2017

The Issue The issue to be determined is whether Respondent Land Trust #97-12 (“Land Trust”) is entitled to an Environmental Resource Permit (“ERP”) for its proposed project on Perico Island in Bradenton, Florida.

Findings Of Fact The Parties Petitioner Joseph McClash is a resident of Bradenton, Florida, who uses the waters in the vicinity of the project for fishing, crabbing, boating, and wildlife observation. Petitioner Manasota-88, Inc., is an active Florida nonprofit corporation for more than 20 years. Manasota-88 has approximately 530 members, most of whom (approximately 300) reside in Manatee County. The mission and goal of Manasota-88 includes the protection of the natural resources of Manatee County, including Anna Maria Sound and Perico Island. Petitioner FISH is an active Florida nonprofit corporation in existence since 1991. FISH owns real property in unincorporated Cortez in Manatee County and maintains a Manatee County mailing address. FISH has more than 190 members and more than 150 of them own property or reside in Manatee County. The mission and goal of FISH includes protection of the natural resources of Manatee County, including Anna Maria Sound and Perico Island. Intervenor Suncoast Waterkeeper, Inc., is an active Florida nonprofit corporation in existence since 2012. The mission of Suncoast Waterkeeper is “to protect and restore the Suncoast’s waterways through enforcement, fieldwork, advocacy, and environmental education for the benefit of the communities that rely upon coastal resources.” Suncoast Waterkeeper provided the names and addresses of 25 members residing in Manatee County. A substantial number of the members of Suncoast Waterkeeper use the area and waters near the proposed activity for nature-based activities, including nature observation, fishing, kayaking, wading, and boating along the natural shorelines of Anna Maria Sound and Perico Island. Intervenor Sierra Club, Inc., is a national organization that is a California corporation registered as a foreign nonprofit corporation in Florida. Sierra Club has been permitted to conduct business in Florida since 1982. The mission of Sierra Club includes protection of the natural resources of Manatee County, which include Anna Maria Sound and Perico Island. Sierra Club provided the names and addresses of 26 members who live in Manatee County. A substantial number of the members of Sierra Club use the area and waters near the proposed project for nature-based activities, including observing native flora and fauna, fishing, kayaking, wading, and boating along the natural shorelines of Anna Maria Sound and Perico Island. Respondent Land Trust is the applicant for the challenged ERP and owns the property on which the proposed project would be constructed. Respondent District is an independent special district of the State of Florida created, granted powers, and assigned duties under chapter 373, Florida Statutes, including the regulation of activities in surface waters. The proposed project is within the boundaries of the District. The Project Site The project site is 3.46 acres of a 40.36-acre parcel owned by Land Trust. The parcel includes uplands, wetlands, and submerged lands, on or seaward of Perico Island, next to Anna Maria Sound, which is part of Lower Tampa Bay. Anna Maria Sound is an Outstanding Florida Water. The project site is adjacent to a large multi-family residential development called Harbour Isles, which is currently under construction. Access to the Land Trust property is gained through this development. The Land Trust parcel contains approximately seven acres of high quality mangroves along the shoreline of Anna Maria Sound. They are mostly black and red mangroves, with some white mangroves. The mangroves on the project site amount to a total of 1.9 acres. Mangroves have high biological productivity and are important to estuarine food webs. Mangroves provide nesting, roosting, foraging, and nursery functions for many species of wildlife. Mangroves also provide a buffer from storm surge and help to stabilize shorelines. Wildlife species found on the project site include ibises, pelicans, egrets, spoonbills, mangrove cuckoos, bay scallops, fiddler crabs, mangrove tree crabs, horseshoe crabs, marsh rabbits, raccoons, mangrove bees, and a variety of fish. No endangered species have been observed on the project site, but mangroves are used by a number of listed species. The Proposed Project The proposed project is to construct a retaining wall, place fill behind the wall to create buildable lots for four single-family homes, construct an access driveway, and install a stormwater management facility. The stormwater management facility is a “Stormtech” system, which is an underground system usually used in situations where there is insufficient area to accommodate a stormwater pond. Riprap would be placed on the waterward side of the retaining wall. The retaining wall would be more than 35 feet landward of the mean high water line in most areas. Petitioners contend the proposed retaining wall is a vertical seawall, which is not allowed in an estuary pursuant to section 373.414(5). “Vertical seawall” is defined in section 2.0(a)(111), Volume I, of the Environmental Resource Permit Applicant’s Handbook (“Applicants Handbook”) as a seawall which is steeper than 75 degrees to the horizontal. It further states, “A seawall with sloping riprap covering the waterward face to the mean high water line shall not be considered a vertical seawall.” The retaining wall is vertical, but it would have riprap covering its waterward face and installed at a slope of 70 degrees. The retaining wall is not a vertical seawall under the District’s definition. Stormwater Management Stormwater in excess of the Stormtech system’s design capacity would discharge into Anna Maria Sound. Because Anna Maria Sound is an Outstanding Florida Water, District design criteria require that an additional 50 percent of treatment volume be provided. The Stormtech system meets the District’s design criteria for managing water quality and water quantity. Projects which meet the District’s design criteria are presumed to provide reasonable assurance of compliance with state water quality standards. Petitioners’ evidence was not sufficient to rebut this presumption. Petitioners contend the District waiver of water quality certification for the proposed project means that Land Trust was not required to meet water quality standards. However, that was a misunderstanding of the certification process. All state water quality criteria are applicable. Petitioners contend water quality monitoring should be imposed for this project. However, section 4.7 of the Applicant’s Handbook, Volume II, provides that if the applicant meets the District’s design criteria, water quality monitoring is not required. Petitioners failed to prove the proposed stormwater management system cannot be constructed, operated, or maintained in compliance with applicable criteria. Wetland Impacts In order to create buildable lots, 1.05 acres of the 1.9 acres of mangroves on the project site would be removed and replaced with fill. A swath of mangroves approximately 40 feet wide would remain waterward of the retaining wall. The proposed direct and secondary impacts to the functions provided by wetlands were evaluated using the Uniform Mitigation Assessment Method (“UMAM”) as required by Florida Administrative Code Chapter 62-345. UMAM is used to quantify the loss of functions performed by wetlands considering: current condition, hydrologic connection, uniqueness, location, fish and wildlife utilization, time lag, and mitigation risk. The District determined the filling of 1.05 acres of wetlands would result in a functional loss of 0.81 units and the secondary impacts resulting from installation of the retaining wall would result in a loss of 0.09 units for a total functional loss of 0.9 units. Petitioners contend the functional loss would be greater. Petitioners contend the wetland delineation performed by Land Trust and confirmed by the District did not extend as far landward as the hydric soils and, therefore, the total acreage of affected wetlands would be greater. However, Petitioners did not produce a wetland delineation for the project site, and their evidence was not sufficient to rebut Land Trust's prima facie evidence on this issue. Petitioners’ experts believe the secondary impacts caused by the proposed project would be greater than calculated, including fragmentation of the shoreline mangrove system, damage to the roots of mangroves near the retaining wall, and scouring effects caused by wave action associated with the retaining wall. Respondents assert that the analysis by Petitioners’ expert Jacqueline Cook relied on federal methodology and that “the science used in her analysis is not contained in the state or district rule criteria.” Reliance on science is always appropriate. However, Ms. Cook’s use of a federal impact assessment methodology creates doubt about whether her scoring is consistent with UMAM. Despite the unreliability of Ms. Cook’s UMAM score, it is found that Respondents’ UMAM score under-calculated secondary impacts due to scour and other effects of changed water movement that would be caused by the retaining wall. It was not explained how the loss of storm buffering and erosion prevention functions of wetlands are accounted for in the UMAM score. Elimination or Reduction of Impacts Section 10.2.1 of the Applicant’s Handbook, Volume I, states that in reviewing a project the District is to consider practicable design modifications to eliminate or reduce impacts to wetland functions. Section 10.2.1.1 explains: The term “modification” shall not be construed as including the alternative of not implementing the activity in some form, nor shall it be construed as requiring a project that is significantly different in type or function. A proposed modification that is not technically capable of being completed, is not economically viable, or that adversely affects public safety through the endangerment of lives or property is not considered “practicable.” A proposed modification need not remove all economic value of the property in order to be considered not “practicable.” Conversely, a modification need not provide the highest and best use of the property to be “practicable.” In determining whether a proposed modification is practicable, consideration shall also be given to cost of the modification compared to the environmental benefit it achieves. Land Trust originally proposed constructing a surface water retention pond. The Stormtech stormwater management system would cause less wetland impact than a retention pond. Land Trust contends the use of a retaining wall reduces wetland impacts because, otherwise, more mangroves would have to be removed to account for the slope of the waterward side of the fill area. However, this proposition assumes the appropriateness of the size of the fill area. Land Trust also contends wetland impacts are reduced by using the adjacent development to access the proposed project site, rather than creating a new road. However, the evidence did not establish that Land Trust had a practicable and preferred alternative for access. Unlike the Stormtech system, the retaining wall and access driveway were not shown to be project modifications. The proposed project would cause fewer impacts to wetlands if the fill area was reduced in size, which was not shown to be impracticable. Reducing the size of the fill area would not cause the project to be significantly different in type or function. Land Trust did not demonstrate that it implemented reasonable design modifications to eliminate or reduce impacts to wetland functions. Mitigation Land Trust proposes to purchase credits from the Tampa Bay Mitigation Bank, which is 17 miles north of the proposed project site. The Tampa Bay Mitigation Bank is in the Tampa Bay Drainage Basin. The project site is in the South Coastal Drainage Basin. Pursuant to section 10.2.8 of the Applicant’s Handbook, Volume I, if an applicant mitigates adverse impacts within the same drainage basin, the agency will consider the regulated activity to have no unacceptable cumulative impacts upon wetlands and other surface waters. However, if the applicant proposes to mitigate impacts in another drainage basin, factors such as “connectivity of waters, hydrology, habitat range of affected species, and water quality” will be considered to determine whether the impacts are fully offset. The parties disputed whether there was connectivity between the waters near the project site and the waters at the Tampa Bay Mitigation Bank. The more persuasive evidence shows there is connectivity. There was also a dispute about the habitat range of affected species. The evidence establishes that the species found in the mangroves at the project site are also found at the mitigation bank. However, local fish and wildlife, and local biological productivity would be diminished by the proposed project. This diminution affects Petitioners’ substantial interests. The loss or reduction of storm buffering and erosion prevention functions performed by the mangroves at Perico Island cannot be mitigated for at the Tampa Bay Mitigation Bank. Cumulative impacts are unacceptable when the proposed activity, considered in conjunction with past, present, and future activities would result in a violation of state water quality standards, or significant adverse impacts to functions of wetlands or other surface waters. See § 10.2.8.1, Applicant’s Handbook, Vol. I. Section 10.2.8(b) provides that, in considering the cumulative impacts associated with a project, the District is to consider other activities which reasonably may be expected to be located within wetlands or other surface waters in the same drainage basin, based upon the local government’s comprehensive plan. Land Trust did not make a prima facie showing on this point. Land Trust could propose a similar project on another part of its property on Perico Island. Anyone owning property in the area which is designated for residential use under the City of Bradenton’s comprehensive plan and bounded by wetlands could apply to enlarge the buildable portion of the property by removing the wetlands and filling behind a retaining wall. When considering future wetland impacts in the basin which are likely to result from similar future activities, the cumulative impacts of the proposed project would result in significant adverse impacts to wetland functions in the area. Public Interest For projects located in, on, or over wetlands or other surface waters, an applicant must provide reasonable assurance that the project will not be contrary to the public interest, or if such activities significantly degrade or are within an Outstanding Florida Water, are clearly in the public interest, as determined by balancing the criteria set forth in rule 62- 330.302(1)(a), and as set forth in sections 10.2.3 through of the Applicant’s Handbook. Rule 62-330.302, which is identical to section 373.414, Florida Statutes, lists the following seven public interest balancing factors to be considered: Whether the activities will adversely affect the public health, safety, or welfare or the property of others; Whether the activities will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the activities will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the activities will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; Whether the activities will be of a temporary or permanent nature; Whether the activities will adversely affect or will enhance significant historical and archaeological resources under the provisions of Section 267.061, F.S.; and The current condition and relative value of functions being performed by areas affected by the proposed regulated activity. The Parties stipulated that the proposed project would not have an adverse impact on public health, navigation, historical resources, archeological resources, or social costs. Land Trust proposes to give $5,000 to the City of Palmetto for an informational kiosk at the City of Palmetto’s public boat ramp. A District employee testified that this contribution made the project clearly in the public interest. Reasonable assurances were not provided that the proposed project is clearly in the public interest because of the adverse cumulative effects on the conservation of fish and wildlife, fishing and recreational values, and marine productivity of Anna Maria Sound, an Outstanding Florida Water.

Recommendation Based on the Findings of Fact and Conclusions of Law set forth above, it is RECOMMENDED that the Southwest Florida Water Management District issue a final order that denies the Environmental Resource Permit. DONE AND ENTERED this 25th day of June, 2015, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of June, 2015. COPIES FURNISHED: Christian Thomas Van Hise, Esquire Abel Band, Chartered Post Office Box 49948 Sarasota, Florida 34230-6948 (eServed) Martha A. Moore, Esquire Southwest Florida Water Management District 7601 Highway 301 North Tampa, Florida 33637 (eServed) Douglas P. Manson, Esquire MansonBolves, P.A. 1101 West Swann Avenue Tampa, Florida 33606 (eServed) Joseph McClash 711 89th Street Northwest Bradenton, Florida 34209 (eServed) Ralf G. Brookes, Esquire Ralf Brookes Attorney 1217 East Cape Coral Parkway, Suite 107 Cape Coral, Florida 33904 (eServed) Justin Bloom, Esquire Post Office Box 1028 Sarasota, Florida 34230 (eServed) Robert Beltram, P.E., Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899

Florida Laws (7) 120.52120.569120.57120.68267.061373.414403.412
# 3
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT vs WILLIAM D. GOING, 20-005557 (2020)
Division of Administrative Hearings, Florida Filed:Pinellas Park, Florida Dec. 28, 2020 Number: 20-005557 Latest Update: Sep. 29, 2024

The Issue Did Respondent, William D. Going, willfully and intentionally violate Florida Statutes and Southwest Florida Water Management District (District) rules regulating well construction? If he did, what corrective action is appropriate?

Findings Of Fact William Going is a licensed water well contractor. He has held License Number 1564 since 2007. Mr. Going is a managing member of Going Irrigation, Inc., and conducts business under that name. Mr. Going constructed four sand point irrigation wells at a residential property in St. Petersburg, Florida. He did not have and had not applied for a Well Construction Permit (WCP). 1 All citations to Florida Statutes are to the 2020 codification unless noted otherwise. 2 The findings are based upon the evidence admitted at the hearing and the stipulations of the parties. Mr. Going did not call or otherwise contact the District to request a WCP. The District operates an online permitting system called the Water Management Information System (WMIS). The District will issue a WCP based upon a telephone call, an application on its website, a faxed application, a mailed application, or a hand-delivered application. The District routinely issues permits within two hours of receiving an application, often within ten minutes to half an hour. The District's application system operates from 7:00 a.m. to 10:00 p.m. It is infrequently offline for a few hours. While quick, the process reviews significant information. It verifies that the well location is sufficiently distant from septic systems, verifies construction methods and materials, and verifies, if the well is for drinking water, that the well is not too close to a contamination site. Mr. Going is a registered and experienced user of WMIS. The District learned of the unpermitted wells on April 28, 2020, when it received an anonymous complaint. On May 5, 2020, approximately ten days after he constructed the wells, Mr. Going submitted WCP Application 889173 for construction of the four already completed sand point irrigation wells. He did not disclose that they were already completed. He falsely represented them as proposed. The District approved the application on May 6, 2020, and issued WCP 889173 to Mr. Going. On June 11, 2020, Mr. Going submitted four Well Completion Reports for the wells, falsely representing that each was completed on May 7, 2020. This was more than 30 days after Mr. Going completed the wells. Mr. Going claimed at the hearing that he tried to apply for a WCP for four or five days before constructing the wells but was locked out of the WMIS. Mr. Going said that his son usually obtained permits online for the company. He also claimed that he tried to apply online on April 24 and 25, 2019. His claims are not persuasive. There is no question that Mr. Going knew the requirements for obtaining a permit and reporting completion. In 2009, in Order No. SWF 09- 017, the District imposed a $500.00 fine and assessed five points against his license for an almost identical offense. In that case, Mr. Going also constructed a well without a permit from the District or applying for a permit. In that case, like this one, he sought to excuse failure to apply for a permit by claiming difficulties with the website. In that case he blamed his wife's unfamiliarity with computers, rather than his own, for failure to apply. In that case, like this one, he applied for and obtained a permit after constructing the well. Mr. Going knowingly and willfully constructed four unpermitted wells, filed a WCP application more than thirty days after he completed the wells, and misrepresented the dates of completion in the WCP completion reports that he filed with the District. Mr. Going tries to characterize his after-the-fact misrepresentations as mitigation. But they were not. Mitigation would have been contacting the District to advise it of the wells' unpermitted construction and the asserted justification for it. Furthermore, his misrepresentations deprived the District of the chance to prevent construction of the wells using improper materials or near a septic tank or contaminated location.

Florida Laws (4) 120.569120.57120.574120.68 Florida Administrative Code (4) 40D-3.04140D-3.41162-531.30062-531.450 DOAH Case (1) 20-5557
# 4
DUNES GOLF AND COUNTRY CLUB vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 78-000756 (1978)
Division of Administrative Hearings, Florida Number: 78-000756 Latest Update: Sep. 21, 1978

Findings Of Fact The Dunes Golf and Country Club, Sanibel, is a partnership owned by John K. Kontinos and William R. Frizzell. They operate a nine hole golf course consisting of 65 acres of the eastern portion of Sanibel Island. The golf course is open to the public and, during the winter season, some 150 to 175 persons utilize the facility daily, but in the period May--November, it is utilized by only about 15 or 20 persons per day. The golf course is presently irrigated by water obtained from the lower Hawthorn and Suwannee aquifers through a well that is approximately 737 feet deep. On the days that water is pumped from the well, the pumping duration is from 8 to 12 hours per day, but the monthly hours during which pumping occurs averages approximately 155 hours per month. There is another existing well in another portion of the applicant's property which extends 896 feet into the Suwannee aquifer. The well presently in use (well number 1) has 546 feet of casing and the well that is not in use (well number 2) has 700 feet of casing. (Testimony of Kontinos, Exhibits 2, 4) On December 15, 1977, the Dunes Golf and Country Club submitted an application to the South Florida Water Management District for a consumptive use permit to withdraw 320 acre feet of groundwater per year to irrigate an area of approximately 109 acres. The intent of the application was to obtain a sufficient quantity of water to irrigate the golf course which the applicant intends to enlarge to consist of 18 holes. The additional 9 holes would cover some 44 acres and well number 2 is intended to be activated to provide additional water for this purpose. (Testimony of Kontinos, Keiling, Exhibits 1- 2) The South Florida Water Management District issued the required public notice of the application on March 30, 1978, and objections to the application were received by that agency from the City Council of Sanibel, the Island Water Association, Inc., and George R. Campbell. Public notice of hearing on the application was duly published on March 30, 1978. (Exhibits 5-7) The staff of the South Florida Water Management District reviewed the application and recommended continuation of the applicant's existing use from the lower Hawthorn Formation and use of additional irrigation water from the Suwannee aquifer in the total amount of 320 acre feet annually. It also recommended that the issuance of a permit should be conditioned in various respects to include semiannual submission of water quality data and pumpage records for each well, installation and maintenance of well controls, and repair or replacement of well casings, valves or controls that leak or become inoperative. The staff further recommended that maximum monthly withdrawals from the lower Hawthorn Formation be limited to 7.5 million gallons and 7.6 million gallons from the Suwannee Formation. At the hearing however, the South Florida Water Management District representative changed these recommendations to 8.9 MO and 6.1 MG respectively. Additionally, the initial recommendation of 320 acre feet annual withdrawal was reduced to 200 acre feet. This amount is considerably less that the average of 600 acre feet used on other comparably sized golf courses. Further the staff representative recommended at the hearing that a further condition be attached to the issuance of the permit; i.e., Condition 15, which requires the permittee to submit analyses of total dissolved concentrations in water samples from each well within 30 days of permit issuance and, if such concentration exceeds 4,000 MG/L, logging procedures as to the affected well will be required with necessary safeguards to be employed to eliminate any interaquifer leakage. (Testimony of Gleason, Exhibit 4) The objections of the City of Sanibel and the Island Water Association, Inc. involved concerns that further withdrawals from the lower Hawthorn aquifer will affect the availability of water which is treated by the water association for general island use. In addition, there is concern about possible contamination of the lower Hawthorn aquifer from interaquifer leakage. The Water Association is a member-owned cooperative that is not under the jurisdiction of the municipality. It is concerned about the draw down in the water table which will be occasioned by additional withdrawals by the applicant. It therefore believes that pumping tests should be conducted prior to the issuance of a permit to provide information concerning the capacity and safe yield of the wells. Although an Association expert testified that the proposed Dunes' withdrawal would create a cone of depression that would extend into and influence the existing Water Association wells, the evidence shows such influence to be minimal due to the fact that the Dunes wells are almost three miles away from the nearest Association well. Further, due to the limited time that the Dunes wells are pumped each day, the aquifer recovers to a certain extent during other hours. Although concerns are felt by the Water Association that water quality will be affected because of leakage from the Suwannee aquifer to the lower Hawthorn aquifer due to possible corrosion of steel casings in the Dunes wells, no evidence was presented that such casings are in fact defective and will contribute to degradation of water quality because of additional withdrawals. The additional special condition placed upon the issuance of a permit by the South Florida Water Management District will require correction of any such leakage that is discovered in the future. Previous studies show that the lower Hawthorn aquifer is separated from the Suwannee aquifer by the Tampa Limestone Formation which would slow down any entry of poorer quality water into the Hawthorn aquifer. It is found that the lesser amounts of water recommended by the South Florida Water Management District at the hearing will further reduce the likelihood of water quality degradation or draw down in other Island wells. (Testimony of Butler, Holland, Nuzman, Gleason, Exhibits 6, 8-13) Ecological concerns were expressed at the hearing by a public witness as to the wastefulness of irrigating golf coup Yes and the requirement for fertilizer in sandy soil which causes leaching of nutrients after heavy water use. (Testimony of Webb)

Recommendation That a permit be issued to the applicant authorizing the consumptive use of the quantity of water recommended by the South Florida Water Management District staff, subject to the recommended conditions thereto. THOMAS C. OLDHAM Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: John H. Wheeler Post Office Box V West Palm Beach, Florida 33402 James D. Decker, Esquire Post Office Box 200 Ft. Myers, Florida 33902

Florida Laws (2) 373.019373.223
# 5
PAT NATHE GROVES, INC. vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-000545 (1975)
Division of Administrative Hearings, Florida Number: 75-000545 Latest Update: Oct. 29, 1990

Findings Of Fact Mr. George Szell was presented by the Southwest Florida Water Management District and sworn as a witness. Mr. Szell was qualified and accepted as an expert hydrogeologist employed by the District. Included within Mr. Szell's responsibilities to the District were evaluations of the subject application. An application for consumptive water use permit has been filed in proper form by Pat Nathe Groves, Inc., and admitted into evidence as Exhibit A. The water source is an existing well located on a 134-acre tract of land in Pasco County within the Withlacoochee Basin, as shown by Exhibit A. The water is to be used for irrigation purposes. The maximum daily withdrawal sought is 720,000 gallons and the average daily withdrawal sought is 130.192 gallons. Proper notice of this proceeding and application have been given to all persons entitled thereto by statute and rule. No objections to the application have been received by the District. The request of 130.192 gallons average daily withdrawal is approximagely 81.96 percent of the maximum average daily withdrawal allowed by the water crop theory set forth in Section 16J-2.11(3), F.A.C. Therefore, the requested withdrawal is not violative of the consumptive use test. Pursuant to Mr. Szell's testimony, none of the matters set forth in Subsections 16J-2.11(2), (3), and (4) exist so as to require the denial of this permit.

# 6
AMERICAN ORANGE CORPORATION vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-001578 (1975)
Division of Administrative Hearings, Florida Number: 75-001578 Latest Update: Oct. 29, 1990

The Issue Whether a consumptive use permit for the quantities of water as applied for should be granted.

Findings Of Fact Application No. 7500112 requested water from three (3) wells for the purpose of industrial use. This application is for a new use. The center of withdrawals will be located at Latitude 27 degrees 38' 58" North, Longitude 81 degrees 48' 21" West, in Hardee County, Florida. The application is for the use of not more than 470 million gallons of water per year and not more than 2,592,000 gallons of water during any single day to be withdrawn from the Florida Aquifer. Application received as Exhibit 1. Notice was published in a newspaper of general circulation, to-wit: The Herald Advocate, published weekly in Wauchula, Florida, on August 7 and 14, 1975, pursuant to Section 373.146, Florida Statutes. Notices of said public hearing were duly sent by certified mail as required by law. The affidavit of publication was received without objection and entered into evidence as Exhibit 2. Letters of objection were received from the following: Mr. Joseph F. Smith, Route 1, Box 238, Wauchula, Florida 33273. Mr. Smith states that in his opinion such withdrawal of water will severely damage his property. He is developing a mobile home park on eight (8) acres and is fearful that the amount of water requested in this application will diminish his supply of water for his project. A letter from Mr. and Mrs. A. H. Van Dyck, written on August 16, 1975, Route 2, Box 657, Wauchula, Florida 33873. They are fearful that the large amount of water American Orange Corporation proposes to pump each day will affect their shallow well which provides water for their home. They would like to see some type of agreement whereby American Orange Corporation would be willing to pay for replacement of the well if the corporation should cause their well to go dry. Mr. Stanley H. Beck, Counselor at Law, wrote a letter in behalf of his client, Harold Beck, requesting information as to the applicable statutes and regulations which affect the matter of the consumptive use permit. A telegram was sent by Harold Beck of Suite 1021, Rivergate Plaza, Miami 33131, stating that he objected to the application of American Orange Corporation's withdrawal of water or the reason that it would reduce the property value. The witness for the permittee is Barbara Boatwright, hydrologist, who was duly sworn and agreement was reached on each point enumerated as required by Rule 16J-2.11, Rules of the Southwest Florida Water Management District and Chapter 373, Florida Statutes. The staff hydrologist recommended that the permit be granted with two (2) conditions. One was that each of the wells be metered and two, that the District receive monthly reports from each meter. The applicant has consented.

Florida Laws (1) 373.146
# 7
ALLIGATOR LAKE CHAIN HOMEOWNERS ASSOCIATION vs. MELVIN AND MARY THAYER AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 84-004491 (1984)
Division of Administrative Hearings, Florida Number: 84-004491 Latest Update: Jan. 15, 1986

Findings Of Fact The Applicant/Respondents, Melvin and Mary Thayer have applied to the Department of Environmental Regulation (Department) for a "dredge and fill permit" seeking authorization to remove an existing 32-foot wooden fence and install in its place a chain-link fence, which as originally applied for would not extend more than 32 feet waterward from the 64-foot mean sea level elevation of Alligator Lake as marked by the waterward end of the existing wooden fence. The fence proposed would be five feet high and would possess a gate at its landward end which would permit pedestrian passage in both directions around the near-shore area of the lake. The project site is located approximately 400 feet south of U.S. 441-192 and adjacent to Alligator Lake, lying one mile west from Bay Lake within Section 10, Township 26 South, Range 31 East in Osceola County, Florida. As clarified and amended prior to hearing, the application now requests the permit to authorize, instead, a 26-foot fence extending that distance waterward from the 64-foot mean sea level elevation. The Department has permitting jurisdiction under Chapters 253 and 403, Florida Statutes as well as Chapter 17-4, Florida Administrative Code. There is no dispute that the Department has jurisdiction of the permitting of the subject fence inasmuch as the fence would be constructed waterward of the 64-foot mean sea level elevation or the "high pool" level of Alligator Lake in Class III waters of the state. Additionally, the area of the project waterward of the 64- foot mean sea level elevation lies on sovereign lands of the State of Florida under the jurisdiction of the Department of Natural Resources. That Department, as yet, has not issued a permit for use of sovereign land for the intended purpose as envisioned by Section 253.77, Florida Statutes. Ed Edmunson was tendered by both Respondents as an expert witness and was accepted as to his expertise in biological assessment of dredge and fill construction projects. It was thus established that the construction and installation of the fence and removal of the existing fence would cause no Class III water quality violations. Additionally, it was established that no navigational impediment would result from the fence as presently proposed which only involves a 26-foot fence extending from the 64-foot mean sea level elevation waterward in a perpendicular direction from the shore and near-shore of Alligator Lake. Parenthetically it should be noted that the original proposal involved extending the fence 32-feet waterward and then installing a right angle section parallel to the shoreline for an indeterminate distance. The right angle portion of the fence has been deleted from the permit application and the portion perpendicular to the shoreline has been amended from 32 feet down to 26 feet from the 64-foot mean sea level elevation. In that connection, it was established by witness Walter, accepted as an expert in the field of engineering, that on January 7, 1985, the water line of Alligator Lake was at 62.4 feet mean sea level elevation and the end of the existing 32-foot wooden fence was 16 feet from the then existing waterline of the lake. If the water in the lake was at the 64 feet mean sea level elevation or "high pool" stage, which has occurred on the average of once every three years, the water at the end of the fence would still be only .9 feet in depth at the waterward extreme end of the proposed 26-foot fence. Indeed, it was established with- out contradiction by the Applicant, Melvin Thayer, that in the 17 or 18 years he has observed the project site, that only "seven or eight inches of water is the most depth he has seen at the end of the fence." Thus, the fence as proposed to be installed, will pose no impediment or hazard to the navigation of fishing boats, skiing boats or other craft, and, in that regard, a dock in close proximity to the site of the proposed fence extends approximately 90 feet waterward at the present time. In view of the Petitioner's other objection to the fence concerning their feared loss of access to walk around the near-shore area of the lake to visit friends and the like, the permit applicants have agreed to install a gate for public access anywhere specified by the Department along the extent of the proposed fence. The testimony of Petitioner's witnesses, including a representative of the Game and Fresh Water Fish Commission, consists largely of objections to the precedent of permitting a private fence to be constructed in the waters of the state and on state water bodies, but no impediment to navigation has been established especially since the neighboring dock and numerous other docks around the shoreline of the lake extend waterward much farther than will the proposed fence. No degradation to water quality has been established to result from the proposed project. The fence has not been shown to be contrary to the public interest since it will not interfere with wildlife habitat or natural resources, nor impede navigation in any way, and was shown not to impede any public use of the lake or the near-shore area of the lake, in view of the access gate to be provided in the fence. In short, reasonable assurances have been provided that all permitting criteria within the Department's jurisdiction at issue in this proceeding will be complied with, although a permit from the Department of Natural Resources authorizing use of the state lands involved has not been issued as yet.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the application of Melvin and Mary Thayer for authority to remove an existing fence and to install a fence extending 26 feet waterward of the 64-foot mean sea level elevation of Alligator Lake with an attendant public access gate installed therein be GRANTED upon satisfaction of the above-stated condition. DONE and ENTERED this 15th day of January, 1986 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of January, 1986. COPIES FURNISHED: Virginia M. Hoover, MSM Consultant 5366 East Space Coast Parkway St. Cloud, Florida 32769 Norman J. Smith, Esquire Post Office Drawer 1549 Kissimmee, Florida 32741 B. J. Owens, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57253.77403.0876.10
# 8
FLORIDA AUDUBON SOCIETY vs SUGAR CANE GROWERS COOPERATIVE OF FLORIDA, UNITED STATES SUGAR CORPORATION, SUGAR FARMS CO-OP, AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 12-002811 (2012)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Aug. 17, 2012 Number: 12-002811 Latest Update: Apr. 22, 2014

The Issue The issue to be determined in this case is whether Respondents, United States Sugar Corporation (“USSC”), Sugar Farms Co-op (“SFC”), and Sugar Cane Growers Cooperative of Florida (“SCGC”) (collectively “the Applicants”) are entitled to the Everglades Works of the District permits (“WOD Permits”), issued to them by the South Florida Water Management District (“District”).

Findings Of Fact The Parties Audubon is a not-for-profit organization dedicated to restoring and conserving natural ecosystems, focusing on birds and their habitats. Audubon has a substantial interest in the protection of the Everglades and other ecosystems in the area. Audubon’s interest is affected by the proposed agency action because the WOD Permits authorize agricultural discharges that affect these ecosystems. The District is a Florida public corporation with the authority and duty to administer regulatory programs in chapter 373, and Florida Administrative Code Title 40E, including a program for regulating discharges from the Everglades Agricultural Area (“EAA”) into works of the District. The EAA is located south of Lake Okeechobee and comprises about 570,000 acres. The majority of EAA agriculture is sugarcane, with some row crops, such as radishes, leafy vegetables, and corn, and turf sod. During fallow periods, rice is also grown. The Applicants are owners and lessees of agricultural lands in the EAA. Background Some essential background for this case is set forth in rule 40E-63.011: The Everglades is a unique national resource. It has a high diversity of species, and provides habitat for large populations of wading birds and several threatened and endangered species, including wood storks, snail kites, bald eagles, Florida panthers, and American crocodiles. Large portions of the northern and eastern Everglades have been drained and converted to agricultural or urban land uses. Only 50% of the original Everglades ecosystem remains today. The remainder is the largest and most important freshwater sub-tropical peatland in North America. The remaining components of the historic Everglades are located in the Water Conservation Areas (WCAs) and Everglades National Park (ENP). ENP and Loxahatchee National Wildlife Refuge (WCA 1) are Outstanding Florida Waters, a designation which requires special protection for the resource. Large portions of the Everglades ecosystem have evolved in response to low ambient concentrations of nutrients and seasonal fluctuations of water levels. Prior to creation of the Everglades Agricultural Area (EAA), nitrogen and phosphorus were mainly supplied to large areas only in rainfall. Phosphorus is the primary limiting nutrient throughout the remaining Everglades. Sawgrass has lower phosphorus requirements than other species of Everglades vegetation. A substantial portion of EAA nutrients is transported to the remaining Everglades either in dissolved or in particulate form in surface waters. The introduction of phosphorus from EAA drainage water has resulted in ecological changes in substantial areas of Everglades marsh. These changes are cultural eutrophication, which is an increase in the supply of nutrients available in the marsh. The increased supply of phosphorus in Everglades marshes has resulted in documented impacts in several trophic levels, including microbial, periphyton, and macrophyte. The areal extent of these impacts is increasing. In 1988, the United States sued the District and the Florida Department of Environmental Regulation, now the Department of Environmental Protection (“DEP”), in federal court, alleging that the agencies failed to enforce Florida’s water quality standard for nutrients in waters of Loxahatchee Wildlife Refuge and Everglades National Park. The principal pollutant of concern was phosphorus. Audubon, USSC, and certain members of SCGC and SFC intervened in the federal case. In February 1992, the parties resolved their dispute through a settlement agreement approved by the federal court (“the Consent Decree”). The Consent Decree required the District and DEP to take action to meet water quality standards by December 31, 2002. At that time, the nutrient water quality standard was a narrative standard, prohibiting the discharge of nutrients so as to cause “an imbalance in natural populations of aquatic flora and fauna.” The Consent Decree directed the District to construct 34,700 acres of stormwater treatment areas (“STAs”) so that nutrient-laden surface water discharged from the EAA could be treated before discharge to the Everglades Protection Area (“EvPA”), which includes Loxahatchee Wildlife Refuge, Everglades National Park, and the Water Conservation Areas. STAs are large freshwater wetlands which remove phosphorus from the water column through physical, chemical, and biological processes such as sedimentation, precipitation, plant growth, and microbial activity. The first STAs were constructed and in operation in 1993. The Applicants operate in the S-5A Basin within the EAA. Their surface water is conveyed to STA-1W for treatment before being discharged to the EvPA. The Consent Decree required the District to initiate a regulatory program by 1992 to require permits for discharges from internal drainage systems (farms) in the EAA. The regulatory program was to be based on agricultural best management practices (“BMPs”). The goal of the program, as stated in the Consent Decree, was to reduce phosphorus loads from the EAA by 25 percent over the base period (1979-1988). In 1992, the District promulgated rule chapter 40E-63, which required EAA farmers to obtain WOD permits and to implement agricultural BMP plans. The BMP plans address fertilizer use and water management. Permittees must also implement a water quality monitoring plan. The rules require reduction of the total phosphorus loads discharged from the EAA Basin, as a whole, by 25 percent from historic levels. See Fla. Admin. Code R. 40E-63.101. If the EAA, as a whole, is in compliance, individual permittees are not required to make changes to their operations. See Fla. Admin. Code R. 40E-63.145(3)(d). If the 25 percent reduction requirement is not met, the rule contemplates that individual permittees in the EAA would have to reduce nutrient loads in their discharges. See Fla. Admin. Code R. 40E-63.145(3)(e).1/ The Consent Decree also required the District to obtain permits from the Department for discharges from the STAs to the EvPA and to conduct research and adopt rules to “numerically interpret” the narrative standard. In 1994, the Florida Legislature enacted the Everglades Forever Act (“the Act”), chapter 94-115, Laws of Florida, which is codified in section 373.4592. The Legislature authorized the district to proceed expeditiously with implementation of the Everglades Program. See § 373.4592(1)(b), Fla. Stat. The “Everglades Program” means the program of projects, regulations, and research described in the Act, including the Everglades Construction Project. The Everglades Construction Project involved the construction of 40,452 acres of STAs, which is 5,350 acres more than was required by the federal Consent Decree. The Act acknowledged the BMP regulatory program for the EAA that the District had established in rule chapter 40E-63, and stated: Prior to the expiration of existing permits, and during each 5-year term of subsequent permits as provided for in this section, those rules shall be amended to implement a comprehensive program of research, testing, and implementation of BMPs that will address all water quality standards within the EAA and Everglades protection Area. See § 373.4592(4)(f)2., Fla. Stat. The Act required DEP to issue permits to the District to construct, operate, and maintain the STAs. See § 373.4592(9)(e), Fla. Stat. The Act required development of a numeric water quality phosphorus standard for the EvPA by 2003. See § 373.4592(4)(e), Fla. Stat. The Act set the goal of achieving the phosphorus standard in all parts of the EvPA by December 31, 2006. In June 1995, modifications were made to the Consent Decree. The deadline for achieving water quality standards in the EvPA was changed from December 31, 2002, to December 31, 2006. The STAs were increased from 34,700 acres to 40,452 acres. The chronological developments outlined above indicate the intent of the Legislature and the parties to the Consent Decree to conform state law and the Consent Decree to each other. In 2001, DEP initiated rulemaking that lead to its adoption of the Phosphorus Rule, rule 62-302.540, in 2003. The rule set a numeric phosphorus criterion for the EvPA of 10 parts per billion (“ppb”), applied through a four-part test in which attainment is determined separately for “unimpacted” and “impacted areas” of the EvPA. See Fla. Admin Code R. 62- 302.540(4). In conjunction with this rulemaking, the DEP and District developed the Everglades Protection Area Tributary Basins Long Term Plan for Achieving Water Quality Goals (“Long- Term Plan”) in March 2003. The Long-Term Plan provided remedial measures and strategies divided into pre-2006 projects and post- 2006 projects. The pre-2006 projects included structural and operational modifications to the existing STAs, implementation of agricultural and urban BMPs in areas outside the EAA or C-139 basins, and construction of several restoration projects congressionally mandated by the Comprehensive Everglades Restoration Plan. Modeling of treatment capabilities of the STAs after implementation of the pre-2006 projects predicted that the 10 ppb standard for phosphorus could be achieved, but not consistently. Therefore, the Long-Term Plan required the District to identify and evaluate methods to improve phosphorus reductions, and if the phosphorus criterion was not achieved by December 31, 2006, to implement post-2006 modifications and improvements. The post- 2006 strategies include projects to expand and improve the STAs. They do not include changes to the BMP program. In 2003, the Legislature substantially amended the Act. It incorporated the Long-Term Plan into the Act, finding that it “provides the best available phosphorus reduction technology based on a combination of the BMPs and STAs.” § 373.4592(3)(b), Fla. Stat. The Long-Term Plan contemplates maintenance of the BMP program in the EAA, with refinements derived from BMP research. Recent Conditions and Events As previously stated, chapter 40E-63 requires the total phosphorus load from the EAA to be reduced by not less than 25 percent from historic levels. Since full implementation of the BMP regulatory program, annual phosphorus loads have been reduced by approximately 50 percent. Despite the efforts and projects undertaken, the phosphorus standard was not being achieved as of December 31, 2006, in all parts of the EvPA. In 2007, the DEP issued a permit to the District for discharges from the STAs to the EvPA (referred to as the “Everglades Forever Act” or “EFA permit”). The permit required the District to design and construct several regional water management projects, including structural enhancements to STA-1W, and the construction of 6,800 acres of additional STAs. The permit and its compliance schedules provided interim relief through 2016 from the water quality based effluent limitation (WQBEL) necessary to achieve the 10 ppb phosphorus standard. The 2007 EFA permit was not challenged by Audubon or any other entity. The District, DEP, and the United States Environmental Protection Agency began working together in 2010 to develop new strategies for achieving compliance with the phosphorus standard in the EvPA. The agencies determined that compliance could be achieved by expanding the STAs by 7,300 acres (6,500 acres would be added to STA-1W) and constructing flow equalization basins to store up to 110,000 acre feet of stormwater runoff. These basins are designed to attenuate peak flows into the STAs in order to improve the processes that remove phosphorus. In September 2012, DEP issued the District a new EFA permit, which authorized continued operation of the District’s S-5A pump station, STA-1W, and the related conveyance systems by which stormwater runoff from the S-5A Basin is ultimately discharged to the EvPA. The permit was issued with a Consent Order, requiring the District to expand STA-1W by 6,500 acres of effective treatment area in accordance with a timeline and the District’s Restoration Strategies. The 2012 EFA Permit and Consent Order were not challenged by Audubon or any other entity. In 2013, the Legislature amended the Act again. The Act’s reference to the Long-Term Plan was revised to include the District’s Restoration Strategies Regional Water Quality Plan, which called for expanding the STAs and constructing flow equalization basins. See § 373.4592(2)(j), Fla. Stat. The Legislature added a finding that “implementation of BMPs, funded by the owners and users of land in the EAA, effectively reduces nutrients in waters flowing into the Everglades Protection Area.” See § 373.4592(1)(g), Fla. Stat. The 2013 amendments indicated the Legislature’s intent to codify into law the strategies developed by the District and other regulatory agencies to achieve water quality standards in the EvPA. Those strategies do not materially change the BMP program in the EAA. The Act and the rules of the District create programs for achieving restoration of the EvPA that rely heavily on the STAs. Over the years, the STAs have repeatedly been enlarged and enhanced. In contrast, the requirement for farmers in the EAA to reduce their phosphorus loading by 25 percent has not changed in 21 years. It is beyond the scope of this proceeding to question the wisdom of the programs that have been established by statute and rule. Whether Additional Water Quality Measures Are Required A principal dispute in this case is whether the WOD Permits must include additional water quality measures to be implemented by the Applicants. Section 373.4592(4)(f)4. provides that, as of December 31, 2006, all EAA permits shall include “additional water quality measures, taking into account the water quality treatment actually provided by the STAs and the effectiveness of the BMPs.” Audubon asserts that the requirement for additional water quality measures has been triggered. The District does not interpret the statute as requiring additional water quality measures under current circumstances. The interpretation of the statute is primarily a disputed issue of law and is addressed in the Conclusions of Law. There, it is concluded that additional water quality measures are not required. Whether the BMP Plans are Adequate Audubon contends that the WOD Permits should be denied because the Applicant’s existing BMP plans are not “tailored” to particular soils, crops, and other conditions. This contention is based on section 373.4592(4)(f)2.c., which states in relevant part: BMPs as required for varying crops and soil types shall be included in permit conditions in the 5-year permits issued pursuant to this section. Audubon showed that the Applicants have similar BMP plans for the thousands of acres covered in the three WOD Permits, and contends that this similarity proves that BMPs are not being tailored to specific farm conditions. However, soils and crops are similar throughout the EAA. The soils of the EAA are almost entirely muck soils and the primary crop is sugarcane with some corn or other vegetable rotated in. The Applicants use many of the same BMPs because they have similar soils and grow similar crops. There are three main categories of BMPs implemented in the EAA: nutrient and sediment control BMPs, particulate matter and sediment control BMPs, and water management BMPs. See Fla. Admin. Code R. 40E-63.136, Appendix A2. The BMPs proposed by the Applicants are based on research in the EAA and recommendations specifically for EAA soils and the crops grown there. The Applications do not identify the specific BMPs that will be implemented, but only the number of BMPs that will be selected from each of the BMP categories (i.e., sediment control). The Applicants must use BMPs on the District’s list of approved BMPs unless an alternative BMP is requested and approved. The lack of greater detail was explained as necessitated by the need for flexibility during the life of the permit to adapt BMPs to varied crops and conditions. Audubon does not believe the BMP plans are tailored enough, but there is no rule criterion for determining how tailored BMP plans must be, except they must achieve the overall goal of reducing phosphorus loading in discharges from the EAA by at least 25 percent. This goal is being achieved.2/ Audubon did not show that any particular BMP being used by an Applicant was the wrong BMP for a particular soil and crop, or identify the BMP that Audubon believes should be used. Audubon failed to prove that the Applicants’ BMP plans do not meet applicable requirements. Whether the Applications Are Complete Audubon contends that the WOD Permits must be denied because the Applications are incomplete. Many of Audubon’s completeness issues deal with minor discrepancies of a type that are more appropriately resolved between the District and applicants, not violations of criteria that are likely to affect a third party’s interest in environmental protection. Rule 40E-63.130 lists the requirements for a permit application for activities in the EAA Basin. An Application Guidebook is incorporated into chapter 40E-63, which contains instructions for completing the application. For applications to renew a permit, the practice of the District is to not require the resubmittal of information that was previously submitted to the District and which has not changed. The Application Guidebook explains this practice. The Applicants supplemented their applications at the final hearing to provide information that Audubon claimed was omitted from the Applications.3/ Audubon contends that the Applications are incomplete because some application forms are not dated and other forms are not signed by appropriate entities. The District explained its rule interpretation and practices associated with the forms. Additional signatures and dates were submitted at the final hearing. Audubon failed to demonstrate that the Applications are incomplete based on the identity of the persons who signed application forms or the lack of dates. Audubon contends the Applications are incomplete because copies of contracts or agreements are not included as required by rule 40E-63.132(3). Audubon failed to prove that contracts and agreements exist that were not included. Audubon contends the Applications are incomplete because they do not contain a completed Form 0779, entitled “Application For A Works Of The District Permit,” as required by rule 40E-63.132(5). In some cases, the information for Form 0779 had been previously submitted and was unchanged, so the District did not require it to be resubmitted for the permit renewal. Additional information was provided at the final hearing. Audubon failed to prove that the Applications are incomplete based on missing information on Form 0779. Audubon contends that the Applications are incomplete because documentation regarding leased parcels was missing. Pursuant to rule 40E-63.130(1)(a), individual permit applications must be submitted by the owner of the land on which a structure is located and any entity responsible for operating the structure, and the permit application must include the owners of all parcels which discharge water tributary to the structure. Applications may be submitted by a lessee if the lessee has the legal and financial capability of implementing the BMP Plan and other permit conditions. The District explained that when applications are submitted by a lessee who will be the permittee or co-permittee, the District requires the lessee to be a responsible party for the entire term of the permit, which is five years. If the lessee is a not a co-permittee, the District does not require information about the lease and does not require the lessee’s signature. If the lessee is a co-permittee, but the lease expires during the term of the permit, the District requires the applicant to modify the permit when the lease expires. Audubon failed to prove that the Applications are incomplete based on lease information Audubon contends that the Applications are incomplete because they fail to show that the Applicants participated in an education and training program as required by rule 40E- 63.136(1)(g). The preponderance of the evidence shows that the Applicants participated in education and training programs. Audubon failed to prove that the Applications are incomplete for any of the reasons raised in its petition for hearing or advanced at the final hearing. Water Quality Standards in the EAA Audubon presented some evidence of algal accumulations in ditches and canals, but the evidence was insufficient to prove the Applicants are violating water quality standards applicable in the EAA. Summary Audubon failed to carry its burden to prove that the Applicants are not entitled to the WOD Permits.

Recommendation Based on the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED that South Florida Water Management District issue Permit Nos. 50-00031-E, 50-00018-E, and 50-00047-E. DONE AND ENTERED this 10th day of February, 2014, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of February, 2014.

CFR (1) 40 CFR 131.44 Florida Laws (6) 120.569120.57171.211373.083373.459263.132 Florida Administrative Code (6) 40E-63.01140E-63.09140E-63.10140E-63.13040E-63.14340E-63.145
# 9
DEPARTMENT OF ENVIRONMENTAL REGULATION vs. COMMUNITIES FINANCIAL CORPORATION, ET AL., 79-001560 (1979)
Division of Administrative Hearings, Florida Number: 79-001560 Latest Update: May 14, 1980

Findings Of Fact Respondent Communities Financial Corporation is a Florida corporation engaged in the subdivision and sale of real property. In 1971 CFC purchased approximately twenty-two sections, or 22 square miles, of real property ("the land") in Township 34 South, Range 33 East, Okeechobee County, Florida, which it proposed to sell as individual one-and-one-quarter (1-1/4) acre lots. The subsequent development of that land is the subject of this proceeding. Respondent Coquina Water Management District ("Coquina") was organized pursuant to Chapter 298, Florida Statutes, by judgment of the Circuit Court for Okeechobee County, Florida to perform drainage activities on the land. The land which CFC purchased in 1971 was originally platted in 1912 in a grid system with roads, drainage canals, and ditches. Extensive drainage was required for use of the land because it was very flat and had a high water table. Approximately one-half of the land was subject to flooding. After it was originally platted it was utilized for cattle ranching with drainage ditches connecting the low areas to encourage runoff. Ten-acre tracts surrounded by dikes and two to three foot deep ditches were used for tomato farming. Such agricultural ditching covered approximately 15 square miles of the property. At one time a hotel was situated on a portion of the property. North-South and East-West roads and a 5,000-foot airstrip were constructed across the property. The East-West road along the South boundary of the property, which is now a state road, has an adjacent drainage ditch which received ranchland water runoff from property east of the land. In 1971 and 1972 CFC registered the platted lots for sale with the Division of Florida Land Sales and Condominiums ("Land Sales") of the State of Florida Department of Business Regulation. In the normal course of compiling the documentation to be submitted for registration, CFC contacted several state regulatory agencies to determine whether such agencies required CFC to obtain permits for development of the property. CFC provided those agencies copies of its drainage plans, which included roads, swales, canals, and control structures. The State of Florida Department of Natural Resources ("DNR") stated that the construction of improvements as planned in the development would not be subject to that agency's jurisdiction for purposes of a dredge and/or fill permit. The State of Florida Department of Pollution Control ("DPC"), predecessor of DER, first stated in a letter of October 4, 1971, to Mr. Moseley Collins, who submitted a "plan of reclamation to DPC, that it had no regulatory responsibilities over the project: In response to your request for comments this Department has conducted a preliminary review of the proposed plan. We have no basic objections to the overall plan of development and believe it could be platted as shown. Specific details as to drainage techniques will be reviewed at a latter [sic] date. It is brought to you [sic] attention that although we have no regulatory responsibili- ties in this area we will welcome the opportunity to review cross sections and details at a latter [sic] date. We thank you for the opportunity to review a project of this magnitude at an early date. [Emphasis added.] The DPC, in a letter of March 30, 1972, to Collins, also observed that: This Department has conducted a review of the revised plan for the subject project and endorse the approach that you are contemplating in developing these areas. I have coordinated with other agencies and organizations and they concur with the approach. We would like to review the project at a future date to deter- mine the method of construction of the swales or greenways to move the water from one lake to another through the complete watershed area. You and your client are to be commended on this approach. From the preliminary layout you can see the possibilities for the potential develop- ment of an area for residential usage that will retain a large percentage of the natural resources and minimize the downstream effect on the overall watershed. Please advise when you want to review the project in greater detail. [Emphasis added.] In connection with the registration of the development, CFC submitted to Land Sales the above-referenced letters from DNR and DPC, detailed evidence of the proposed plan of development, and a public offering statement for use in solicitation of lot sales from the general public. Each offering statement contains several statements to the effect that "this is not a homesite subdivision." Land Sales approved use of the offering statement. In using it to solicit sales, CFC committed to the purchasers that it would complete the required road and drainage improvements by December 31, 1979. CFC commenced sales of lots in the development in 1971. The Agreements for Deed approved by Land Sales and subsequently entered into by CFC with lot purchasers required CFC to deliver improved lots by December 31, 1979. Most of the land sales were made between 1971 and 1973. (6,412 lots were sold and 1,146 were conveyed by June 23, 1977.) Approximately eighty percent of the lots have been sold to date. Up to one-half of the approximately nine thousand lot purchasers hold legal title to their lots pursuant to deeds issued to them by CFC upon full payment. CFC began construction of the promised improvements, consisting of roads and drainage, in 1972. At the present time approximately $1,000,000 of improvements have been completed and approximately $750,000 remain to be completed. In 1973 or 1974, CFC and Coquina submitted plans for the surface water management system which CFC proposed to construct for the property to the South Florida Water Management District ("SFWMD"). The initial plan of development called for the construction of a road and canal system. At the request of SFWMD, the plan was subsequently changed to a road and swale system, and the configuration of one of the control structures was changed. The design changes resulted in more water retention on the property and the preservation of sensitive areas. After several years of analysis and review of the design plan, inspection of the project site, and a public hearing, SFWMD granted conceptual approval for the surface water management system to be constructed by CFC in 1977. The conceptual approval was partially based on the SFWMD staff's assessment than pollutant loadings from the property after development would be less than existing loadings, and that adverse water quality impacts as a result of the proposed development were unlikely. The 1977 SFWMD conceptual approval of the drainage plan for the development was followed by the issuance of a construction permit for the westernmost seven sections on March 15, 1979. Throughout this period construction was continuing. The drainage system as approved consists of grassed lot, roadside, and collector "swales" together with a retention area comprised of natural wetlands in the area of the property known as Ash Slough. The volume of water leaving the property after development will be the same as that leaving the property before development. The drainage conveyances are designed with gradually sloping sides, vary to widths of over 100 feet for the larger collector conveyances, and have depths varying from 2 feet for the "lateral" swales to 3 feet for the larger collector swales. The groundwater table in the area of the project site varies from zero to approximately 30 inches below ground surface. The swales were designed at the request of SFWMD in lieu of the canals proposed within the same easements in the original drainage plan for the development. It appears from the evidence that these drainage conveyances are designed so as to contain contiguous areas of standing or flowing water only following the occurrence of rainfall or flooding. Although some testimony indicated that these conveyances contained contiguous areas of standing water, these observations were made either at isolated times during the progress of construction or soon after a major hurricane passed through the area. Since the purpose of the "swales" is to facilitate drainage from the property, it would appear necessary from an engineering viewpoint to allow some period of time after construction of the swales for them to stabilize to make a valid determination that they will not function as designed. Accordingly, it would not appear unusual that the swales contain areas of standing water until they have been given ample opportunity to stabilize. On the basis of the record in this proceeding, a determination simply cannot be made at this point in time that the swales will not function as designed. Following DPC's initial determination of no jurisdiction in 1971 and 1972, it and DER, its successor agency, were not involved with the project until 1974, when DPC received an inquiry concerning land sales matters from the U.S. Department of Housing and Urban Development. In 1975, a DER staff member conducted a critical review of the Project and filed an internal memorandum faulting the project on the same essential grounds that are the basis for the Notice of Violation issued June 1, 1979. DER representatives participated in various SFWMD meetings from 1975 to 1977 when the conceptual approval of the drainage plan for the project was discussed. During this period, SFWMD forwarded copies of various materials dealing with the project to DER. Further, a DER representative attended the public hearing on September 8, 1977, when the conceptual approval of the project was granted by SFWMD. Respondents' first indication of DER's renewed interest in the development was a letter from DER Subdistrict Manager Warren Strahm to Robert Birenbaum on June 23, 1977. This letter stated, in part, that: The above referenced application/staff report has been supplied to this office by the South Florida Water Management District (SFWMD). It has been determined that your project is subject to Chapters 403 and/or 253, Florida Statutes. A review of drainage plans by our staff indicates the referenced project will comply with Chapter 403, Florida Statutes permit requirements for pollutant discharge. Since these plans have been incorporated into the SFWMD permit, no discharge permit or monitoring in addition to SFWMD permit requirement will be required by the Department at this time. It appears, however, that the referenced project may fall within the permitting requirements set forth in Chapter 17-4, Florida Administrative Code. Pursuant to F.A.C. 17-4.28(2) should any excavation take place in submerged lands or within the transitional zone of submerged lands, dredge and fill permits will be required by this Department prior to commencement of said activi- ties. [Emphasis added.] Please contact Mr. Roger G. Gallop, at the Fort Pierce Branch Office, telephone (305) 464-8525, at your convenience in order to discuss the need for a construction dredge and fill permit. Thank you for your cooperation. Three months later, in a letter from James Brindell to Coquina, Respondents were notified that: A review, by this agency, of the plans associated with your Surface Water Management Permit Applica- tion No. 02187-A indicates that permits will be required from the Department of Environmental Regulation pursuant to Chapter 403 and/or Chapter 253, Florida Statutes for the construction con- templated. Specifically, permits will be required for the construction and operation of discharge structures as well as for any dredging and/or filling in the waters of the state including the submerged lands and transitional zone of these submerged lands. Additionally, certification pursuant to section 401 of F.L. 92-500 may be required. Formal or conceptual appova1 of your project by the South Florida Water Management District does not imply that your project will satisfy the requirements of this agency. Please contact Mr. Warren G. Strahm, Subdistrict Manager, 3301 Gun Club Road, West Palm Beach, phone 305/689-5800, at your earliest convenience concerning application for these permits. (Emphasis added). This letter was followed one-and-one-half months later by a "Letter of Notice" from DER advising Respondents that DER had reason to believe the project was in violation of Chapter 403, Florida Statutes, and requesting CFC to cease any further work. Throughout this series of correspondence, CFC and Coquina maintained that DER did not have permit jurisdiction. This position was reasserted in a letter of November 1, 1977, from Emerson Allsworth, counsel for Coquina, to DER. During this period, numerous meetings were held involving representatives of Respondents and DER in which Respondents were urged by DER to apply for permits. Respondents failed to do so, and, on June 1, 1979, DER issued its Notice of Violation. Natural drainage from the property occurs southwestward into an area known as Ash Slough; southward from the central portion of the property into Gore Slough; and from the northeast section of the property into Company Slough. The headwaters of both Ash Slough and Gore Slough originate on the project site and periodically extend off Respondents' property to the south to join the waters of Chandler Slough. Chandler Slough, in turn, eventually empties into Lake Okeechobee 11 to 15 miles from the property. Company Slough also extends off the project site eastward onto the lands of others. There is, however, insufficient evidence in this record from which to conclude that Company Slough regularly exchanges flow with any other body of water. A "slough", as that term is used in the context of this proceeding, is a surface conveyance pathway for waters whose lateral boundaries are not as well-defined as a stream bed, and whose rate of flow is relatively slow. Due to the flat topography of the project site, Ash, Gore and Company Sloughs have imprecise boundaries, and their rates of flow appear to range at various times from very slow to nonexistent. By Cease and Desist Order dated March 28, 1978, the United States Army Corps of Engineers required Respondents to halt any further work then being conducted on the project, asserting that work in progress at that time was being conducted in waters of the United States, including adjacent wetlands, without first having acquired a permit from the Corps of Engineers. This Order provided, in part, that: Section 301(a) of the [Federal Water Pollution Control Act Amendments of 1972] makes it unlawful to discharge dredged or fill material into waters of the United States unless author- ized by a Section 404 permit issued by the Secretary of the Army acting through the Chief of Engineers. Section 10 of the River and Harbor Act of 1899 prohibits the excavation or depositing of material or erecting any struc- tures in navigable waters of the United States unless authorized by a Department of the Army permit. The work referred to in the paragraph above is deemed to have occurred in waters subject to these statutory requirements without the requisite permits and is considered unlaw- ful by this office. Prior to 25 July, the Corps of Engineers limited the requirement for Section 404 type permits to areas either below the mean high water line in tidal areas or below the ordinary high water line of rivers and streams which either now sup- port, had supported, or were capable of supporting interstate commerce. However, on 25 July 1975, the regulatory juris- diction of the District was expanded to all waters of the United States and adjacent wetlands. [Emphasis add.] Subsequently, however, by memorandum dated May 17, 1978, the United States Army Corps of Engineers determined that it did not have jurisdiction over Respondent's activities for the following reasons: In the northeast and eastern portion of the tract the flagponds and saw grass prairies are isolated with no discernible drainage sloughs or patterns. The other area of concern, in the south west sector, contains isolated ponds and an old man-made drainage canal that comprises shallow, intermittent potholes above the natural headwaters of Ash and Gore Sloughs. There was no recognizable flow in any part of the canal and the point at which average annual flow appear to be 5 c.f.s. or greater is located to the south a considerable distance from the subject tract. The project, as proposed, will not destroy or threaten any endangered species or their habitat nor adversely impact water quality of the ultimate receiving waters in Kissimmee River and Lake Okeechobee. In 1971, the Soil Conservation Service of the United States Department of Agriculture classified Ash and Gore Sloughs, as well as Fish Slough, to which Company Slough is alleged by DER to connect, as "intermittent". This determination is supported by hydrological data compiled by the South Florida Water Management District which shows no net flow in Chandler Slough for as many as six months in 1975 and four months in 1976. In the South Florida Water Management District report concerning flow patterns in Chandler Slough, it was pointed out that: The climate in this portion of Florida is subtropical with warm summers and moderate winters. Rainfall is seasonal with about 75 percent of the total occur- ring in a well-defined wet season, from May to October. This distribution of rainfall results in considerable surface water flow during part of the year. During the late winter and early spring many of the creeks and sloughs, such as Chandler Slough, become completely dry. [Emphasis added.] In addition, testimony in the record in this proceeding establishes that on at least one occasion during the time in which construction on the property was being conducted, Company Slough was completely dry. There is no data in the record quantifying the annual flow of water from Ash and Gore Sloughs into Chandler Slough. Further, there is no evidence concerning the periodicity of any such water exchanges between Ash and Gore Sloughs and Chandler Slough. As indicated above, the evidence establishes that Chandler Slough, which is the larger collector slough into which both Ash and Gore sloughs allegedly discharge, periodically becomes "completely dry." DER witnesses testified that they had observed contiguous areas of standing water in Ash, Gore and Company Sloughs during visits to the site, and had also determined the existence of an exchange of waters between Ash, Gore and Company Sloughs with other sloughs connecting to Chandler Slough by analyzing aerial photographs. However, those aerial photographs were not made a part of the record in this proceeding. Additionally, the relatively few visits to the site by these witnesses, in the absence of validly derived data establishing pertinent flow rates, is insufficient to establish "normal" conditions in the area. This is especially true in light of the aforementioned countervailing determinations based upon data compiled by the United States Army Corps of Engineers, the United States Department of Agriculture and the South Florida Water Management District. The evidence shows that some of the types of vegetation listed in DER's vegetation indices by which DER determines whether areas are "submerged lands" or "transitional zones" of submerged lands have been found on the project site. Among the types of vegetation observed in and around Ash, Gore and Company Sloughs are maidencane, water willow, pickerelweed, button bush, saw grass and St. John's wort. Although these species were detected in some locations by visual observation, apparently no attempt was made to quantify these plants vis-a-vis other vegetative types, nor were any physical measurements made to locate their boundaries. In a report dated August 26, 1977, the SFWMD attempted to identify the acreage, but not boundaries, of wetlands on the development site. The findings of that report show that approximately 2,014 of 14,080 acres, or 14.3 percent of the total site, contains wetlands vegetation. The report also indicates that the wetlands vegetation is scattered in different locations over the site, with the median occurrence being 68 acres per 640-acre section. DER presented quantified evidence showing turbidity readings in the Ash Slough area of the development during the construction of swales in August, 1979, of 325 Jackson Units and November and December, 1979, of 155 and 176 Jackson Units, respectively. It should be noted that these readings were performed after the filing of the Notice of Violation herein. Although samples of August 6, 1979, were taken without a background sample in Ash Slough, the evidence establishes that background readings in Ash Slough were less than 25 Jackson Units. The evidence clearly establishes that DER's water quality sampling and analysis were conducted in accordance with applicable requirements of Chapter 17, Florida Administrative Code. The evidence establishes that these readings are attributable to construction of swales and control structures and would not be expected to continue after completion of construction. There is no evidence to show the duration of the discharges resulting in these turbidity readings, nor is there any showing of actual damage to animal, plant or aquatic life. Petitioner and Respondent have submitted proposed findings of fact in this proceeding. To the extent that those findings of fact are not adopted in this Recommended Order, they have been specifically rejected as being either irrelevant to the issues in this cause, or as not having been supported by the evidence.

Florida Laws (12) 120.57380.06380.12403.031403.061403.062403.087403.088403.121403.161403.803403.813