The Issue The issue presented for decision herein is whether or not Respondent engaged in conduct, set forth hereinafter in detail, which amount to wilful or deliberate violation of local law and thereafter abandoned a construction project without just cause, prior to completion.
Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, documentary evidence received and the entire record compiled herein, I make the following relevant factual findings. The Petitioner, Department of Professional Regulation, is the state agency charged with regulating the practice of contracting. Respondent is, and has been at all time material hereto, a registered general contractor having been issued license number RG 0006192. On July 15, 1985, Respondent contracted with Mr. and Mrs. Louis Mara to renovate a garage at the Mara home in Hollywood, Florida for a price of $3,000. (Petitioner's Exhibit 2). Respondent was given, prior to commencement of the job, a $2,000 deposit. Respondent commenced performing the Mara job in Hollywood without first obtaining a building permit. About one month after Respondent commenced completion of the Mara's project, he left the project having completed less than 20% of the work he contracted to perform. Respondent has not returned to the Mara's project in more than two years despite the Mara's plea that he return to complete the work. A review of the official records for the City of Hollywood reveals that Respondent did not obtain any permit to complete the garage renovation for Mr. and Mrs. Louis Mara. Pursuant to Chapter 71-575, Laws of Florida, special acts of 1971, the City of Hollywood has adopted the South Florida Building Code, as revised from time to time, as the building code for the City of Hollywood and its regulations governed the construction, maintenance, repair and condemnation of buildings for the City of Hollywood. (Ordinance #0-71-158, Section 1, 12 22-71 Petitioner's Exhibit 6). As noted, Respondent, or a representative on his behalf, did not appear at the hearing to contest or otherwise refute the allegations contained in the Administrative Complaint filed herein.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That Respondent's license number RG 0006192 as a registered general contractor be REVOKED. DONE and ORDERED this 28th day of January, 1988, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of January, 1988.
Findings Of Fact This cause comes on for consideration based on the Administrative Complaint of the Petitioner, State of Florida, Department of Professional and Occupational Regulation, Florida Construction Industry Licensing Board, now referred to as State of Florida, Department of Professional Regulation, Florida Construction Industry Licensing Board. The essential allegations of the Administrative Complaint are as found in the issue statement of this Recommended Order and that discussion in the issue statement is incorporated into the Findings of Fact and made a part hereof. The Petitioner, State of Florida, Department of Professional Regulation, Florida Construction Industry Licensing Board, is an agency of the State of Florida, which has the responsibility to regulate those individuals who serve the public in the capacity of contractors in the State of Florida. This regulatory function carries with it the obligation to prosecute those individual licensees whom the regulatory agency believes to have committed offenses as defined by Chapter 468, Florida Statutes. The possible outcome of such a prosecution carries with it the potential revocation or suspension of the license of those persons regulated by the agency. On this occasion, by Administrative Complaint, the Petitioner has charged E. J. Pollock, d/b/a Miami Advertising, Inc., with violations of Chapter 468, Florida Statutes, as set out herein. The Respondent has replied to the Administrative Complaint by reguesting a Subsection 120.57(1), Florida Statutes, hearing, which de novo hearing was held on the date and at the time and place set out above. E. J. Pollock, d/b/a Miami Advertising, Inc., is the holder of a Certified general Contractor's license, No. CG C004577, held with the Petitioner. That license was current and active in October, 1975, and continued as an active license until the year 1977 when the license became inactive and it remains inactive at this time. The facts reveal that the Respondent in 1975 entered into a discussion with Dr. Thor Brickman about assisting Dr. Brickman in obtaining a building permit from the Metropolitan Dade County Building and Zoning Department, Dade County, Florida. This permit was to allow the construction of certain office alterations of Dr. Brickman's office located at 1136 N.W. 119th Street, Dade County, Florida. The plans and specifications for such alterations may be found as Petitioner's Exhibit No. 8 admitted into evidence. After some discussion, the Respondent and Dr. Brickman concluded an arrangement by which the Respondent would act as a contractor on the job, in the sense of having the overall responsibility for its construction. This included the responsibility to pay the workers, sub contractors and material man. The agreement between Pollock and Brickman was one in which Pollock was acting in his individual capacity as opposed to through affiliation with a contracting firm. However, at the time Pollock entered into this agreement with Dr. Brickman, his Certified general Contractor's license had been transferred to an affiliation with Miami Advertising, Inc. The Respondent had made this transfer in anticipation of a job to be performed for Miami Advertising, Inc., and in fact certain preliminary matters had been concluded with Pollock acting as manager for the project for Miami Advertising, Inc. Miami Advertising, Inc., was without knowledge of the contract between Pollock and Dr. Brickman. Notwithstanding the lack of knowledge on the part of Miami Advertising, Inc., and the representations to Brickman that the Respondent was acting in his individual capacity when he contracted to remodel Brickman's office, the Respondent applied for a building permit to be issued by the Dade County Building and Zoning Department and in doing so he indicated that he was securing that permit as a qualifier for Miami Advertising, Inc. This can be seen in the petitioner's Exhibit No. 5 admitted into evidence which is a copy of the building permit application as issued on October 31, 1975. Pollock commenced the work and Dr. Brickman paid Pollock directly for the work that was being done. The parent checks were endorsed and cashed by Pollock. The amount Pollock received totaled $6,797.22. Sometime in December, 1975, the owner, Dr. Brickman, became disenchanted with some of the workers whom Pollock had on the job in the sense that those workers had been drinking while on the job. Brickman advised Pollock of this and indicated to Pollock that he did not want those persons on the job without supervision. Nonetheless, the owner continued to advance money to Pollock to pay for the job as contracted for. In January, 1976, the Respondent left the job and Brickman was of the impression that the roof on the extension was finished and that there was no problem with the roof, but this impression was wrong because in February, 1976, one of the owner's tenants began to complaint about the roof leaking and those complaints continued until the tenant moved out due to water damage. This caused Brickman to lose moneys in rentals. When Brickman spoke with Pollock about the leaking roof, Pollock sent a roofer to the job to see about the problems but Brickman was not satisfied with that roofer and declined to have him make any corrections to the roof job. (Although the Respondent denies the responsibility for the completion of the roofing work on the Brickman project, the testimony clearly reveals that he had accepted that responsibility as a part of the contract.) The roofer spoken of, whose name is Montgomery, came to the job in March, 1976. Subsequent to Montgomery's visit, problems continued to occur with the roof and the condition of the roof in April, 1976, and the interior of the building may be seen in the Composite Exhibit No. 1 by the Petitioner, which is a series of photos depicting the roof and interior. Pollock would not return and complete the job and Dr. Brickman made a complaint to cause administrative charges against the Respondent. This original complaint was dropped and in November, 1977, Pollock called about completing the job which was still unfinished. Brickman agreed to have Pollock cane and complete the job. Pollock did not return to the job as he stated he would do. In December, 1978, a representative of the Metropolitan Dade County Building and Zoning Department went to the project and found that the job was closed and found that no framing inspection had been requested by Pollock and completed as required by Metropolitan Dade County Building and Zoning Department Code. Other matters within the job site were found to be deficient. The original building permit had expired and the required roofing permit had never been granted. The condition of the project as it existed at the time of the inspection may be found in certain photographs taken by the Building Inspector which may be found as a part of the Petitioner's Composite Exhibit No. 2 admitted into evidence. The problem with permits was subsequently rectified; however, based upon the inspector's evaluation, notices of violations were filed in January, 1979, against the Respondent Pollock. The violations spoken to above were for violations of the building and zoning code, particularly Metropolitan Dade County Building and Zoning Department Code No. 305.2, failure to call for inspections between October 31, 1971, and January 4, 1979, and Metropolitan Dade County Building and Zoning Department Code Section No. 304.4(b), failure to construct office alterations according to plans between October 31, 1975, and January 4, 1979. (These provisions are part of the South Florida Building Code which is used by Metropolitan Dade County.) The charges were made through a two-count information in Case 79-53600 in the County Court in and for Dade County, Florida. For the former violation, the Respondent was adjudged guilty and received a fine of $750.00 with $25.00 court costs, and for the latter count Pollock was sentenced, with the sentence being suspended from day to day and term to term. This Statement of Charges and Disposition may be found as petitioner' s Composite Exhibit No 3 admitted into evidence, a copy of the Charges, Judgment, Sentence and Order of the Court. The Respondent, Pollock, was also charged by Metropolitan Dade County with a violation of the Code of Metro Dade, Chapter 10, Section 10-22 (b), abandonment of the construction project without legal authority. (The disposition of that charge is unknown to the Hearing Officer, in that it was not presented as a matter of proof in the course of the hearing and the facts of the existence of such charge came in by a stipulation of fact between the parties to this action.) The Respondent returned to the job in January, 1979, and on the date of the hearing 95 to 99 percent of the job had been completed. Still remaining to be completed were certain roofing work with metal-to-metal soldering and gravel stops to be concluded and at that time the roof was still leaking. In view of the damage to Brickman' s property, a claim was made against the liability insurance required by Subsection 468.106(6), Florida Statutes. This claim was denied by the insurance carrier because their insurance covered Miami Advertising, Inc., only, and that company had no knowledge of the contract or the job. An indication of this denial may be found as Petitioner's Composite Exhibit No. 4 admitted into evidence, which are copies of letters denying coverage. They are addressed to Dr. Brickman and are from Parliament Insurance Company, insurer of Miami Advertising, Inc.
Recommendation It is recommended that the Respondent, E. J. Pollock, who holds his license as qualifier for Miami Advertising, Inc., License No. CG C004577, be suspended for a period of one (1) year. This recommendation is made with the knowledge of the letters offered in mitigation of the penalty. DONE AND ENTERED this 26th day of November, 1979, in Tallahassee, Florida. CHARLES C. ADAMS, Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: Barry Sinoff, Esquire Sinoff, Edwards & Alford 2400 Independent Square One Independent Drive Jacksonville, Florida 32202 H. Adams Weaver, Esquire 310 Okeechobee Boulevard Post Office Box "M" West Palm Beach, Florida 33402 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD
Findings Of Fact By Stipulation of the parties, it is found that Respondent is, and has been at all times material hereto, a certified roofing contractor in the State of Florida, having been issued license number CC-C015772. He is also known as Tony Gory, and was the qualifying agent for Roofing Technology, Inc., at all times material hereto. On or about August 16, 1982, Respondent submitted a proposal, on behalf of Roofing Technology, Incorporated, to Lillian Perper for roofing work to be done on her residence at 3616 Flamingo Drive, Miami Beach, Florida. Mrs. Perper accepted the proposal on August 17, 1982, and testified that the written proposal contained all terms and conditions of her agreement with Respondent. Respondent obtained the permit for this job on August 23, 1982. Mrs. Perper made timely payments to Respondent, under the terms of their agreement, totaling $11,057.00. Respondent completed the work in late September, 1982 and Mrs. Perper made her final payment on October 8, 1982. Respondent's agreement with Mrs. Perper included a warranty stated as follows: All workmanship and material to be guaranteed against defects for a period of ten (10) years; except for fire, termites, windstorm, or damages caused by acts of God. Within two months after completion of the reroofing, Mrs. Perper noted leaks in her livingroom and bedroom ceilings. She called Respondent, and-he came right out and 3 inspected her roof. He then sent a crew to Mrs. Perper's house and they attempted to locate and fix the leaks. However, they were not successful and the leaks continued. Mrs. Perper made several additional attempts to reach Respondent, but was not able to personally talk with him again about her roof. She did leave messages at his office that she was continuing to have leaks in her roof. In June, 1983, Respondent sent a crew of two men to Mrs. Perper's house to work on her roof. However, she denied them access to her roof because Respondent was not present, although they did identify themselves as roofers who Respondent had sent to repair her roof. Mrs. Perper was concerned that this crew would tear her roof off without Respondent being present to supervise the job. No additional attempts were made by Mrs. Perper to reach Respondent, or by Respondent to repair her roof, after she refused access to the roofing crew in June, 1983. The South Florida Building Code has been adopted as the building code of the City of Miami Beach. Regarding roof coverings, the South Florida Building Code provides that the building official shall be notified by the permit holder upon completion of the roof covering (Section 3401.1(b)(4)), nails should not be driven through the sheathing between supports (Section 3401.1(c)), mortar used to secure roof tile shall be sandwiched between all laps at all butts and along the sides of barrel tile (Section 3403.2(e)), roof tiles shall be secured to resist uplift forces (Section 3403.2(f)) and such tile shall extend beyond roof sheathing at the eaves (Section 3403.2(h)). An inspection of Mrs. Perper's roof conducted on February 25, 1985, by Robert B. Hilson, who was accepted as an expert in roofing and the installation of Spanish-S tile, indicates there were violations of several of the above provisions of the South Florida Building Code when he made his inspection, but there is no evidence that these violations were willful or deliberate, or that they were the result of work completed by Respondent in September, 1982. Between June, 1983, when Mrs. Perper denied access to Respondent's crew and February, 1985, when Hilson made his inspection, Mrs. Perper allowed a painter to go on her roof to see about her leak problem and to repair some flashing around her chimney. There is conflicting evidence concerning whether Respondent called for a final inspection after completing the roofing of Mrs. Perper's residence. Respondent testified that he did call for the inspection, but could offer nothing to substantiate his testimony. Petitioner called Oswald Ferro, building inspector, who testified that in the limited time he had available to him he could only find a record in the City of Miami Beach building department of one inspection on this job, but this was not a final inspection on this job. He had no personal knowledge about inspections on this job or whether Respondent had failed to call for a final inspection. Based upon the conflicting evidence presented and considering the demeanor of the witnesses, it is found that Petitioner has not established that Respondent failed to call for a final inspection.
Recommendation Based on the foregoing, it is recommended that a Final Order be issued dismissing the Administrative Complaint filed against Respondent Frank A. Gory. DONE and ENTERED this 28th day of August, 1986 at Tallahassee, Florida. DONALD D. CONN, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of August, 1986. COPIES FURNISHED: Fred Seely, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Errol H. Powell, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Martin G. Brooks, Esquire 300 Hollywood Federal Building 4600 Sheridan Street Hollywood, Florida 33021 APPENDIX Rulings on Petitioner's Proposed Findings of Fact: 1,2 Adopted in Finding of Fact 1. Adopted in Finding of Fact 2. Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 2. Rejected as irrelevant. 7,8 Adopted in Finding of Fact 3. Adopted in Finding of Fact 5, 6. Adopted in part and rejected in part in Finding of Fact 5, 6. Adopted in Finding of Fact 5. Adopted in Finding of Fact 7. 13,14 Rejected as not based on competent substantial evidence. Adopted in Finding of Fact 5,7. Rejected in Finding of Fact 12. 17,18 Rejected as cumulative and unnecessary. Adopted in Finding of Fact 9. Rejected in Finding of Fact 13. 21-28 Rejected as not based on competent substantial evidence. Respondent did not timely file proposed findings of fact by August 26, 1986 as required by Order entered August 6, 1986, and therefore no rulings can be made relative to any proposed findings which may be submitted by Respondent.
The Issue Whether pursuant to Sections 57.111 or 120.595(1), Florida Statutes, Petitioner Rafael R. Palacios (Palacios) should be awarded reasonable costs and attorney's fees incurred in defense of an administrative proceeding against him that was initiated by the Respondent, Department of Business and Professional Regulation (Department). Whether pursuant to Section 120.595(1), Florida Statutes, Petitioner Steven L. Johns (Johns) should be awarded reasonable costs and attorney's fees incurred in defense of an administrative proceeding against him that was initiated by Respondent.
Findings Of Fact Petitioner, Steven L. Johns, is a Florida Certified General Contractor and the principal qualifier for C. G. Chase Construction Company (Chase Construction). In 1994, Chase Construction entered into a construction contract with Carnival Cruise Lines for an expansion project at the Port of Miami. Chase Construction subcontracted the mechanical work to R. Palacios & Company. Petitioner, Rafael R. Palacios, is the president, primary qualifier, and 100 percent stockholder of R. Palacios & Company. Palacios' principal place of business is located in Miami, Florida. In July and December 1998, Palacios employed less than 25 employees and had a net worth of less than $2,000,000. The contract for the Port of Miami project consisted of two phases. Phase I was to construct an arrival lobby and an enclosed walkway to a terminal. Phase II included the addition of boarding halls, the renovation of an existing elevated area, and the addition of baggage areas. A foundation permit had been pulled for Phase I. The foundation work was quickly completed, and Chase Construction representatives advised both the Port of Miami and Carnival Cruise Lines that they could go no further without a permit. Work stopped for a short period of time. In June 1995, a Representative from the Port of Miami called Chase Construction and told them to go to the Dade County Building and Zoning Department (Building Department) the next day to meet with Port of Miami officials, the architect, and building and zoning officials. Johns sent Dave Whelpley, who was a project manager and officer of Chase Construction. Palacios did not attend the meeting. Dr. Carlos Bonzon (Bonzon) was the director and building official of Dade County's Building Department during the majority of the construction activities at the Port of Miami by Chase Construction. As the building official, Dr. Bonzon gave verbal authorization for the work on the project to proceed above the foundation without a written permit. Inspections were to be done by the chief inspectors for Dade County. After the meeting with the Building Department officials in June 1995, Johns understood that authorization had been given by the building official to proceed with construction without a written permit. Work did proceed and inspections were made on the work completed. The Dade County Building Code Compliance Office (BBCO) had the responsibility to oversee Dade County's Building Department. In early 1996, an officer of the BBCO accompanied a building inspector during an inspection of the Port of Miami project. It came to the attention of the BBCO officer that no written permit had been issued for the project. The BBCO officer notified the chief of code compliance for Dade County. A written permit was issued for Phase II of the Port of Miami Project on February 6, 1996, at which time approximately 80 percent of the work had been completed. On the same date, Chase Construction issued a memorandum to its subcontractors to secure the necessary permits. Shortly after the permits were issued, an article appeared in the Miami Herald concerning the project and the lack of written permits. Respondent, Department of Business and Professional Regulation (Department) became aware of the situation as a result of the newspaper article and began an investigation. Diane Perera (Perera), an attorney employed by the Department since 1993 to prosecute construction-related professional license law violations, played a major role in determining and carrying out the Department's subsequent actions regarding the Port of Miami project and persons licensed by the Department who had been involved in the project. The Department opened investigations against eight Department licensees. Those licensees included two building officials, Bonzon, and Lee Martin; four contractors, Johns, Palacios, Douglas L. Orr, and D. Jack Maxwell; one engineer, Ramon Donnell; and one architect, Willy A. Bermello. By Administrative Complaint prepared by Perera and filed on September 9, 1997, before the Building Code Administrators and Inspectors Board (BCAIB), the Department charged Bonzon with various violations of Part XIII of Chapter 486, Florida Statutes, for having allowed above-grade construction on the project to proceed in the absence of approved plans and building permits. In conjunction with the Bonzon case, Charles Danger (Danger), a licensed professional engineer and Director of BBCO testified in a deposition that above-grade construction of the project had proceeded without a building permit and without approved plans in violation of Chapter 3, Section 301 of the South Florida Building Code. He also testified that Bonzon had exceeded his authority under the South Florida Building Code by authorizing the above-grade construction and that the contractors who performed the work did so in violation of the South Florida Building Code. The Department's charges against Bonzon were resolved through a settlement agreement, whereby Bonzon agreed to relinquish his building code administrator's license. A final order of the BCAIB accepting the settlement agreement was filed on July 2, 1998. In the settlement agreement, Bonzon specifically agreed that his interpretation of the South Florida Building Code provisions, including portions of Section 301, was erroneous. On June 24, 1998, the Department presented the Department's Case Number 97-17322 involving Johns to the Division I Probable Cause Panel (PCP) of the Construction Industry Licensing Board (CILB). The panel members on this date were Gene Simmons and Wayne Beigle. Stuart Wilson-Patton and Leland McCharen, assistant attorneys general, were present to provide legal advise to the PCP. The prosecuting attorney presenting the case to the panel was Perera. The Department was requesting a finding of probable cause against Johns for a violation of Section 489.129(1)(d), Florida Statutes, for knowingly violating the applicable building code by performing above-grade construction work on the Port of Miami project in the absence of approved plans and specifications. Prior to the meeting of the Division I PCP of the CILB, Perera had furnished the two panel members documentary evidence pertaining to the case, copies of which were received in evidence at the final hearing as Respondent's Exhibits 5 and 13, with the exception of a letter dated July 31, 1998, from Petitioners' attorney, Renee Alsobrook. Respondent's Exhibit 5 consisted of materials taken from the Bonzon and Lee Martin cases, including the transcript of the December 22, 1997, deposition of Charles Danger, who was the building officer for the BBCO from 1991 to 1998. Respondent's Exhibit 13 was the investigative file for the Johns' case. The Division I PCP discussed Johns' case and voted to request additional information regarding whether any fast track ordinance existed in Dade County, and if so, how it might have applied to the Port of Miami project. On June 24, 1998, the Division II PCP of the CILB met and discussed the Palacios case, which was designated as the Department's Case No. 97-17313. The members of the panel were James Barge and Richard Cowart. Mr. Wilson-Patton and Mr. McCharen were present to provide legal advise to the PCP. The prosecuting attorney presenting the case to the PCP was Perera. The Department was requesting a finding of probable cause against Palacios for violating Section 489.129(1)(d), Florida Statutes, by knowingly violating the applicable building code by performing above-grade construction work on the Port of Miami project in the absence of approved plans and a building permit. Prior to the Division II PCP meeting, the panel members were provided with materials which were received in evidence at the final hearing as Respondent's Exhibits 5 and 14, with the exception of letters dated July 31 and August 26, 1998, from Renee Alsobrook. Respondent's Exhibit 14 is the Department's investigative file on the Palacios case. Following a discussion of the Palacios case, one of the panel members made a motion not to find probable cause. The motion died for lack of a second, and the panel took no further action on the case that day. Pursuant to Section 455.225(4), Florida Statutes, the case was treated as one in which the PCP failed to make a determination regarding the existence of probable cause and was presented to Hank Osborne, Deputy Secretary of the Department, to make a determination whether probable cause existed. On July 2, 1998, Deputy Secretary Osborne found probable cause, and the Department filed an Administrative Complaint against Palacios, charging a violation of Section 489.129(1)(d), Florida Statutes. The Department never served Palacios with the Administrative Complaint filed on July 2, 1998. The Department did not notify Palacios that the Administrative Complaint had been filed and did not prosecute the Administrative Complaint. At the time the Administrative Complaint was filed, the Department believed that the Legislature was in the process of enacting legislation to repeal Section 489.129(1)(d), Florida Statutes. Chapter 98-419, Laws of Florida, which became law on June 17, 1998, repealed Section 489.129(1)(d), Florida Statutes, effective October 1, 1998. Because of the repeal and the lack of a savings clause for pending cases, the Department determined that as of October 1, 1998, the Department did not have authority to take disciplinary action based on a violation of Section 489.129(1)(d), Florida Statutes. On December 18, 1998, the Department presented the Department's Case Nos. 97-17133 and 97-1732 to the PCPs for a second time with a recommendation to find probable cause that Johns and Palacios had violated Section 489.129(1)(p), Florida Statutes, for proceeding on any job without obtaining applicable local building permits and inspections. Mr. McCharen was present to provide legal advice to the PCPs. Ms. Perera was also present during the meetings of the PCPs. Documentary materials presented to the PCP considering Palacios' case included the materials on the Bonzon and Martin cases which had been previously presented to the PCP panel in June 1998 and the investigative files on Palacios. The investigative file included letters with attachments from Palacios' attorney Rene Alsobrook concerning the materials contained in the Bonzon and Martin cases as they related to Palacios and the investigative file on Palacios. Additionally, the investigative file contained a report from Frank Abbott, a general contractor who had been asked by the Department to review the file on Palacios. Mr. Abbott concluded that Palacios had violated several provisions of Chapters 489 and 455, Florida Statutes, including Section 489.129(p), Florida Statutes. The PCPs found probable cause in the Johns and Palacios cases. On December 23, 1998, the Department filed administrative complaints against Palacios and Johns alleging violations of Section 489.129(1)(p), Florida Statutes. The cases were forwarded to the Division of Administrative Hearings for assignment to an administrative law judge. Palacios and Johns claimed that they were relying on the authorization from Bonzon when they proceeded on the above-grade construction work. No formal administrative hearing was held on the administrative complaints filed on December 23, 1998. On December 18, 1998, a Recommended Order was issued in the related case against Lee Martin, Department Case No. 97-11278, finding that Mr. Martin, the building official who replaced Bonzon and assumed responsibility for the Port of Miami project, had the discretion to allow the remaining construction to proceed while taking action to expedite the plans processsing. A Final Order was entered by the Department dismissing all charges against Mr. Martin. On February 26, 1999, Petitioners Palacios' and Johns' Motions to Dismiss and Respondent's responses were filed. The Motions to Dismiss did not request attorney's fees or costs and did not reference Section 120.595(1), Florida Statutes. The motions did contain the following language: The DBPR has acted in an improper and malicious manner by precluding the Respondent from asserting his response to the second draft Administrative Complaint and requesting the Panel to find probable cause for reasons other than whether there was probable cause to believe the Respondent violated specific disciplinary violations. On March 19, 1999, the cases were consolidated and noticed for hearing on May 12-13, 1999. Section 489.129, Florida Statutes, was amended during the 1999 legislative session to provide: A contractor does not commit a violation of this subsection when the contractor relies on a building code interpretation rendered by a building official or person authorized by s. 553.80 to enforce the building code, absent a finding of fraud or deceit in the practice of contracting, or gross negligence, repeated negligence, or negligence resulting in a significant danger to life or property on the part of the building official, in a proceeding under chapter 120. . . . On April 15, 1999, the Department filed a Motion for Leave to Revisit Probable Cause Panel and to Hold in Abeyance. On April 20, 1999, Petitioners filed a response, stating they did not object to the granting of the motion to hold in abeyance. The final hearing was cancelled, and the cases were placed in abeyance. On May 24, 1999, the Department submitted a Status Report, stating that the cases would be placed on the next regularly scheduled PCP meeting scheduled for June 16, 1999. By order dated May 25, 1999, the cases were continued in abeyance. On July 1, 1999, Palacios and Johns filed a Status Report, indicating that the cases would be presented to the PCPs sometime in July and requesting the cases be continued in abeyance for an additional 30 days in order for the parties to resolve the issues. On July 30, 1999, Palacios and Johns filed a Status Report, stating that the cases were orally dismissed on July 28, 1999, and that a hearing involving issues of disputed facts was no longer required. Based on Johns' and Palacios' status report, the files of the Division of Administrative Hearings were closed by order dated August 3, 1999. No motion for attorney's fees and costs was filed during the pendency of the cases at the Division of Administrative Hearings. On August 3, 1999, orders were entered by Cathleen E. O'Dowd, Lead Attorney, dismissing the cases against Palacios and Johns.
The Issue The issue presented is whether Respondent is guilty of the allegations contained in the Administrative Complaints filed against him, and, if so, what disciplinary action should be taken against him, if any.
Findings Of Fact At all times material hereto, Respondent was licensed as a certified general contractor in the State of Florida, having been issued license number CG C000942. At all times material hereto, Respondent was the licensed qualifying agent for Twenty First Century Construction Management, Inc. On September 5, 1992, Willie Janes, doing business as Janes Roofing Contractor, entered into a contract with Debourah Benjamin to replace the roof at her residence located in Margate, Florida. The contract price was $6,748, but Janes later agreed to do the work for $6,248, which was all Benjamin's insurance company would pay. On November 26, 1992, Benjamin gave Janes a check in the amount of $2,200 as a down payment on the work. The check was payable to Willie Janes. At the time Janes entered into his contract with Benjamin, his local roofing license had expired, and he was not licensed as a roofing contractor by the State of Florida. Respondent applied for the roofing permit for the Benjamin job. The City of Margate Building Department issued permit number 11525-R by and through Respondent's licensure on December 3, 1992. Janes commenced work on the Benjamin project on November 26, 1992. On December 8, 1992, the City of Margate Building Department performed a tin tag inspection of the work done by Janes. The work failed the inspection that day but passed two days later. On January 11, 1993, Benjamin issued a second check, in the amount of $2,300, payable to Willie Janes, for the purchase of roof tile. Janes did not order and did not pay for the roof tile until approximately June 25, 1993. The tile was delivered to Benjamin's residence a few days later and placed on the roof for installation but Janes did not return to the project site. The amount of tile delivered to Benjamin's residence was not sufficient to cover the entire roof. On approximately June 25, 1993, Benjamin noticed for the first time that the name of the company on the permit posted at her residence was Twenty First Century Construction. Neither the Respondent nor Twenty First Century Construction Management, Inc., had any involvement in Benjamin's project other than obtaining the building permit. Benjamin contacted the building department which issued the permit and was referred to Petitioner. An employee of Petitioner advised her that the qualifier for Twenty First Century Construction was Respondent. Benjamin had never heard of Respondent at the time. Benjamin contacted Respondent by telephone several times about completing the work commenced by Janes. Respondent repeatedly promised to finish the roof but never did. Benjamin next contacted the Margate Police Department to report the activities of Respondent and Janes. On September 3, 1993, Officer Liberatori of the Margate Police Department spoke to Respondent by telephone, and Respondent promised to complete the work within 30 days. However, Respondent did nothing to complete the work. The last inspection performed on the Benjamin project under permit number 11525-R was the dry-in inspection performed on February 8, 1993. Permit number 11525-R expired on July 8, 1993. In December 1993 Benjamin had the project completed by another contractor. On November 16, 1992, Delos and Barbara Johnson entered into a written contract with Respondent to remodel a porch enclosure at the Johnson residence in Coral Springs, Florida, for a contract price of $10,250. The Johnsons made three payments to Respondent: $1,000 on September 28, 1992; $5,000 on November 17, 1992; and $3,000 on December 2, 1992. On October 12, 1992, Respondent applied for a building permit from the City of Coral Springs for the Johnson remodeling. The City of Coral Springs issued permit number 920004472 by and through Respondent's licensure on November 30, 1992. When the City of Coral Springs issues a building permit, it provides with the permit a list of the required inspections. Respondent proceeded with the construction until December 2, 1992, when he received the third payment. Thereafter, Respondent ceased all construction activities on the Johnson project. Shortly thereafter, the Johnsons learned from the Coral Springs Building Department that their remodeling project had failed to pass the required inspections. When they confronted Respondent regarding his failure to obtain the required inspections, he represented to them that he had made a videotape of all the work he performed, that he himself was a building inspector and could inspect his work, and that he could get a special inspector to inspect the project from the videotape. At no time material hereto was Respondent a certified building inspector. Videotaping a construction project in lieu of obtaining required inspections is not permitted under the South Florida Building Code nor is it permitted by the City of Coral Springs Building Department. Of the required nine inspections for the project, Respondent only obtained three inspections. Of those three, he only passed two. Respondent's failure to obtain the required inspections constitutes a violation of the South Florida Building Code, the minimum standard required for any type of building construction in South Florida. A contractor's failure to adhere to that minimum standard causes harm to the public from deteriorating construction. The Johnsons and the City of Coral Springs Building Department gave Respondent an opportunity to obtain and pass the required inspections and complete the construction project. When Respondent declined to do so, the attorney hired by the Johnsons discharged Respondent. The Johnsons had paid approximately 90 percent of the money they had saved for the porch enclosure to Respondent, and they could not afford to continue with the construction project using the services of another contractor until November 1994. Rick Hugins of Hugins Construction Corp., the remedial contractor, needed to pass the required inspections that Respondent had neglected in order to be permitted by the City of Coral Springs Building Department to complete the project. Work that needed to be inspected was concealed by subsequently- installed construction materials which had to be removed in order that the required inspections could be performed. Numerous code violations were discovered in the concealed work. The work performed by Respondent was below industry standards. The Johnsons paid Hugins Construction Corp. $10,000 to correct the code violations, to pass the required inspections Respondent had missed, and to complete the project. Hugins completed the project by January 23, 1995. Respondent has been previously disciplined by Petitioner on charges of assisting unlicensed activity and of failing to notify Petitioner of his current mailing address and telephone number. That discipline included the payment of an administrative fine and an assessment of costs associated with that investigation and prosecution.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered finding Respondent guilty of the allegations contained in Counts I and III of the Administrative Complaint filed against him in DOAH Case No. 97- 1365, finding Respondent guilty of the allegations contained in Counts I and II of the Administrative Complaint filed against him in DOAH Case No. 97-1368, requiring Respondent to pay restitution to the Johnsons, assessing against Respondent the costs of investigation and prosecution through the time the final order is entered, and revoking Respondent's certification as a general contractor in the State of Florida. DONE AND ENTERED this 10th day of July, 1998, in Tallahassee, Leon County, Florida. LINDA M. RIGOT Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 10th day of July, 1998. COPIES FURNISHED: Dorota Trzeciecka, Esquire Department of Business and Professional Regulation 401 Northwest Second Avenue, No. N-607 Miami, Florida 33128 Edward Conrad Sawyer, Esquire 1413 North 58th Avenue Hollywood, Florida 33021 Rodney Hurst, Executive Director Construction Industry Licensing Board Department of Business and Professional Regulation 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Lynda L. Goodgame, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792
The Issue Petitioner, Florida construction Industry Licensing Board (hereafter FCILB) seeks to revoke the building contractors license of Respondent, John N. Lambert (hereafter Lambert), on the ground that Lambert willfully or deliberately disregarded and violated applicable building codes of Metropolitan Dade County in violation of Section 468.112(2)(a), Florida Statutes. Initially, Lambert was also charged with abandonment of a construction project in violation of Section 468.112(2)(h), Florida Statutes. However, at the hearing, FCILB abandoned the charge.
Findings Of Fact Lambert is the holder of an inactive building contractors license number CBC009927 which legally qualified Lambert to act for Allstate Homecrafts, Inc., a corporation located in Miami, Florida, engaging in contracting work. Lambert was employed by the corporation but was not an officer or shareholder. On June 10, 1976, Lambert initiated a building permit application for work proposed to be done on the home of Mr. Nelson Tower. Mr. Tower had entered into a contract with Allstate Homecrafts, Inc., on June 4, 1976. The contract reflects that Mr. Neal Phillips acted as a corporate representative and not Lambert. The building permit was issued on August 11, 1976. On July 24, 1976, Allstate Homecrafts, Inc., contracted with a Mr. William Millman, and once again the contract reflects that Neal Phillips was the corporate representative and not Lambert. On September 13, 1976, and again on September 30, 1976, Lambert made application for a building permit with she City of Coral Gables, Florida, for the Millman job. Work was commenced on both projects. Work was still in progress on October 26, 1976, when Lambert wrote a letter to FCILB requesting that his qualification as contractor for Allstate Homecrafts, Inc., cease immediately. The reasoning given by Lambert, without further explanation, was that he could "in good conscience no longer comply" with Florida law regarding licensing of construction industry. Lambert further requested in the letter that he be requalified as an individual licensee. On the same date, Lambert terminated his employment with Allstate Homecrafts, Inc. The Tower project continued on until January, 1977, when it was abandoned by Allstate Homecrafts, Inc. The contract price was $30,000.00 and over $25,000.00 in draws were made. Five thousand dollars ($5,000.00) was drawn on November 2, 1977 $5,000.00 wad drawn on November 24, 1976, and $5,000.00 was drawn on December 16, 1976. These occurred after Lambert terminated his relationship with Allstate Homecrafts, Inc. After the contract was abandoned in January, 1977, Tower spent another $23,000.00 to finish the project. The Millman job continued until December, 1976, at which Lire it was abandoned at about 60 percent completion. A $10,000.00 draw was made on November 4, 1976, and a $5,000.00 draw was made on December 2, 1976. Millman spent an additional $10,000.00 to finish the project. Neither Tower nor Millman ever saw Lambert. All monies paid were given to other corporate representatives. While there was some evidence that violations of applicable building codes did occur, there was a complete absence of evidence to establish that Lambert willfully or deliberately disregarded the South Florida Building Code 4501.2(d)(4); failure to correct an electrical hazard. On February 2, 1978, the Dade County Construction Trade Qualifying Board reported that it had found that there was a prima facie showing of the charges brought against Lambert.
Findings Of Fact Based on the exhibits received in evidence, and on the testimony of the witness at the hearing, I make the following findings of fact. The Respondent, Gerald Z. Hickey, was issued license number ER0008796 by the Electrical Contractors' Licensing Board on November 11, 1983. This license has never been suspended. However, this license expired on June 30, 1984, and is now in a delinquent or "inactive" status. On March 10, 1985, Gerald Z. Hickey was the electrical contractor at an electrical job located at 1500 N.E. 162nd Street, North Miami Beach, Dade County, Florida. On that date at that job location no journeyman electrician was present, but electrical work was being performed by an unlicensed person. On that date at that job location Gerald Z. Hickey was using a temporary service to supply ungrounded and unfused conductors and receptacles at the job site. On that date at that job location receptacles were installed without a Ground-Fault Circuit Interrupter and without a grounding conductor. On that date at that job location Gerald Z. Hickey had failed to provide Ground-Fault protection for personnel at the construction site. These conditions at the job site created a risk of serious injury or death to employees at the job site. As a result of the facts described in the preceding paragraph the Construction Trades Qualifying Board (CTQB) of Metropolitan Dade County brought charges against Gerald Z. Hickey, alleging that the facts described above constituted violations of various specified provisions of the Code of Metropolitan Dade County, of the South Florida Building Code, and of the National Electrical Code. Gerald Z. Hickey entered a plea of guilty to the charges brought against him by the CTQB. The decision of the CTQB was to find Gerald Z. Hickey guilty and to fine him a total of $7,500 and to suspend his certificate of competency for a period of one year. The Code of Metropolitan Dade County, the South Florida Building Code, and the National Electrical Code are all applicable to electrical contracting jobs in Dade County, Florida.
Recommendation Based on all of the foregoing, I recommend that the Electrical Contractor's Licensing Board issue a Final Order to the following effect: Dismissing Counts Two and Three of the Administrative Complaint. Concluding chat Gerald Z. Hickey has violated paragraphs (f) and (n) of Section 489.533(1), Florida Statutes, as charged in Count One of the Administrative Complaint and Imposing on Gerald Z. Hickey a penalty of an administrative fine in the amount of $1,000 and suspending the license of Gerald Z. Hickey for a period of one year. DONE AND ORDERED this 19th day of July, 1985, at Tallahassee, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of July, 1985. COPIES FURNISHED: Charles F. Tunnicliff, Esquire Senior Attorney Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Gerald Z. Hickey 10000 Bahia Drive Miami, Florida 33189 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Jerry W. Hendry, Executive Director Electrical Contractors Licensing Board Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301