Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
M K MECHANICAL, INC. vs PALM BEACH COMMUNITY COLLEGE, 93-000933BID (1993)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Feb. 22, 1993 Number: 93-000933BID Latest Update: Aug. 19, 1993

Findings Of Fact Facts based on stipulation These proceedings concern Petitioner's Bid Protest in connection with that certain project known as Chiller Installation, Glades Campus, Project NO. 9237, PBCC No. 6812. Petitioner has taken all steps necessary to perfect its bid protest in a timely manner and has standing to bring this bid protest. Petitioner and Respondent met and were unsuccessful in an attempt to resolve the bid protest as required by Section 120.53(5), Florida Statutes. M. K. Mechanical, Inc., a Florida corporation, is a State of Florida Certified Mechanical Contractor and as such was a "Qualified Bidder." The original specifications for the subject project contained few electrical specifications and were silent as to how an electrical contractor was to be licensed. The bid was due on Tuesday, January 12, 1993, at 2:00 p.m. On Friday, January 8, 1993, at 3:42 p.m., via facsimile transmission, M. K. Mechanical, Inc., received supplementary electrical specifications, thirty (30) pages in length. Contained in these supplementary specifications, for the first time, was a requirement that the electrical subcontractor had to be "locally" licensed. M. K. Mechanical, Inc.'s, primary place of business is in Edgewater, Volusia County, Florida. M. K. Mechanical, Inc.'s, submitted bid was proper in all respects other than an electrical subcontractor's name was not given, instead "to be determined" was inserted. M. K. Mechanical, Inc., submitted the lowest bid. Electrical subcontractor is a "major" subcontractor on this project. The sole basis for the decision by Respondent that Petitioner's bid was "non-responsive" was the failure to list an electrical subcontractor. Additional facts regarding bid specifications The bid specifications include the requirement that bidders list all "major subcontractors" and that the category of "major subcontractors" includes electrical subcontractors. Section 5.2.1 of the Contract Documents within the Bid Specifications provides as follows: Unless otherwise required by the Contract Documents or the Bidding Documents the Contractor at the bid opening shall furnish to the Owner and Architect Form 00420, a written list of the major Subcontractors; Site Utilities, Structural Concrete, Masonry, Structural Steel & Steel Joists, Plumbing, HVAC, Electrical and Roofing, who he proposes to use on this work.

Recommendation On the basis of all the foregoing, it is RECOMMENDED that Palm Beach Community College enter a Final Order in this case denying the protest of the Petitioner, M. K. Mechanical, Inc., and awarding the contract in Project No. 9237, PBCC No. 6812 to the Intervenor, Hill York Corporation. DONE AND ENTERED this 15th day of July, 1993, in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of July, 1993. COPIES FURNISHED: Sid C. Peterson, Jr., Esquire DeLoach & Peterson, P.A. Post Office Box 428 New Smyrna Beach, Florida 33170 James M. Adams, Esquire Gibson & Adams, P.A. Post Office Box 1629 West Palm Beach, Florida 33402 Herbert L. Dell, President Hill York Corporation Post Office Box 350155 Fort Lauderdale, Florida 33335 The District Board of Trustees Palm Beach Community College 4200 Congress Avenue Administration Building Lake Worth, Florida 33461 Attention: Mr. Dick Jones

Florida Laws (2) 120.53255.0515
# 1
NATIONAL MEDICAL CARE, INC. vs DEPARTMENT OF CORRECTIONS, 93-007111BID (1993)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Dec. 22, 1993 Number: 93-007111BID Latest Update: Apr. 01, 1994

The Issue Whether the decision by the State of Florida, Department of Corrections (DOC) to reject all bids received in response to Request For Proposal 93-RIVHSD- 075 (RFP) was arbitrary, capricious, fraudulent, illegal or dishonest. Additionally, Intervenor challenges Petitioner's standing to bring this proceeding since Bio-Medical Applications, Petitioner's wholly-owned subsidiary corporation, submitted the bid at issue and because Petitioner would not be a party to any contract awarded pursuant to the RFP.

Findings Of Fact Standing In its response to the Request For Proposal at issue in this proceeding, Bio-Medical Applications of Florida, Inc. (BMA) provides the following regarding vendor name and address: Vendor Name: Bio-Medical Applications of Florida, Inc. Vendor Mailing Address: c/o National Medical Care, Inc. 1601 Trapelo Road Walthem, Massachusetts 02154 In the bidder acknowledgment and ownership interest portion of its response to the RFP, BMA disclosed the following: ... This bid is presented in good faith without collusion or fraud and Ernestine M. Lowrie, as signer of the bid from Bio-Medical Applications of Florida, Inc. has full authority to bind as the principal bidder. All stock of Bio-Medical Applications of Florida, Inc. is held by Bio-Medical Applications Management Company, Inc. and all the stock of the latter corporation is held by National Medical Care, Inc., 1601 Trapelo Road, Walthem, Massachusetts 02154. All of the stock of National Medical Care, Inc. is held by W. R. Grace and Company. The Dialysis Services Division of National Medical Care, Inc. (NMC) is the largest division of NMC. In each state in which NMC has an interest in dialysis services operations, Bio-Medical Applications is organized as a corporate entity and is part of the Dialysis Services Division of the parent corporation, NMC. Petitioner in this proceeding, NMC, is not currently organized and registered as a corporation under the laws of the State of Florida. At the final hearing in this case, NMC's representative testified that he was not aware that NMC was registered to do business in the State of Florida but thought NMC had been operating in Florida for about 20 years. BMA is wholly owned by NMC. The Respondent agency originally expressed its intent to award the contract at issue to BMA. NMC has a substantial interest in the RFP and the contract at issue, therefore, its substantial interests will be affected by the agency's proposed action to reject all bids. NMC has alleged that the agency's decision to reject all bids was arbitrary, illegal, dishonest, and fraudulent. Further, Petitioner also contends that the agency decision to reject all bids, after BMA's bid proposal has been disclosed to competitors, undermines the competitive purpose of the bid process. The Request for Proposal On August 27, 1993, the DOC issued RFP No. 93-RIVHSD-075. The RFP requested bidders to submit bids for a contract to perform peritoneal dialysis and hemodialysis treatment at the Department's Broward Correctional Institution and its South Florida Reception Center. The RFP required that bid proposals be filed with the DOC by September 30, 1993. The RFP provided that a bidder would receive up to 50 points for its price proposal and up to 50 points for its qualitative proposal for a total of 100 possible points. The RFP also provided that the DOC reserved the right to reject all bids when the DOC determined it was in its best interest to do so. The Bid Evaluation Upon initial review of the proposals submitted in response to the RFP, the DOC originally calculated that Petitioner's subsidiary, BMA, had received 49 out of 50 possible points from its price, as well as qualitative proposal for a total of 98 points. On October 22, 1993, the DOC sent written notice to all proposers of its intent to award the contract to National Medical Care, Inc. (Petitioner). At the time it mailed its notice of intent, the DOC believed that the difference between the Bio-Medical and the lowest price proposal (received by HealthInfusion) was $156,780 over the five year term of the proposed contract. HealthInfusion and an additional disappointed bidder filed protests contesting the DOC's notice of intent. Based upon input from the protestors, the DOC learned that it had miscalculated the cost of Bio-Medical's proposal. When the DOC corrected its initial error in calculation, BMA's proposal was $340,000 higher over the first three years of the proposed contract and $972,000 higher than the lowest bidder for the entire five year contract term. The Decision to Reject All Bids On November 24, 1993, the DOC notified all bidders of its intent to reject all bids. In addition to the initial miscalculation of price in the bid, the DOC discovered what it considers to be other irregularities in the evaluation in this case. BMA was the existing provider at the time the RFP issued. The bid evaluators worked closely on a day to day basis with Petitioner's employees. The DOC believes the evaluators preferred that Petitioner be awarded the contract and that the evaluators were not objective. During the process of evaluation, the evaluators were provided a letter from a party representing one of the bidders which contained allegations regarding negative background information on other bidders. The DOC believes that the letter should not have been given to the evaluators and that access to the letter further affected the evaluator's ability to be objective. Admitted Facts NMC and the Respondent DOC filed a Prehearing Stipulation in which the following facts are admitted by those parties: The DOC issued Request for Proposal No. 93-RIVHSD-075 ("RFP"). The RFP requested bidders to submit bids for peritoneal dialysis and hemodialysis treatment at Broward Correctional Institution and South Florida Reception Center. Bid proposals had to be filed with the DOC by September 30, 1993. On November 24, 1993, the Department notified all bidders of its intent to reject all bids. The Department rejected all bids due to significant irregularities in the bid evaluation process and the price difference between the winning bid and the low bid was too great. (Emphasis supplied.) On December 3, 1993, National Medical Care, Inc. filed its notice of intent to protest the DOC's decision to reject all bids. On December 13, 1993, National Medical Care, Inc. filed its formal written bid protest. Burden of Proof Petitioner has failed to prove, by the preponderance of evidence, that the DOC acted arbitrarily, illegally, fraudulently or dishonestly in making its decision to reject all bids.

Recommendation Based upon the foregoing, it is RECOMMENDED that the Respondent enter a final order dismissing NMC's protest of its decision to reject all bids in response to request for Proposal No. 93-RIVHSD-075. RECOMMENDED this 16th day of March, 1994, at Tallahassee, Florida. JAMES W. YORK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of March, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 93-7111BID The following constitute specific rulings, pursuant to Section 120.59(2), Florida Statutes, upon the parties' respective proposed findings of fact (PFOF). Petitioner's PFOF: Petitioner's PFOF 1 is adopted in paragraph 8 of the Recommended Order (RO). Petitioner's PFOF 2 is adopted in paragraph 9 of the RO. Petitioner's PFOF 3 is hereby adopted. Petitioner's PFOF 4 is hereby adopted. Petitioner's PFOF 5, to the extent not conclusory, is adopted in paragraph 1 of the RO. Petitioner's PFOF 6 is hereby adopted. Petitioner's PFOF 7 is adopted in paragraph 2 of the RO. 8-9. Petitioner's PFOFs 8 and 9 are hereby adopted. Sentence 1 of Petitioner's PFOF 10 is hereby adopted. Sentence 2 of this proposed finding is rejected as conclusory. Petitioner's PFOF 11 is adopted in paragraph 14 of the RO. 12-14. Petitioner's PFOFs 12, 13 and 14 are hereby adopted. Petitioner's PFOF 15 is adopted in paragraph 2 of the RO. Petitioner's PFOF 16 is hereby adopted. Petitioner's PFOF 17 is adopted in paragraph 26 of the RO and is a fact, in effect, stipulated to by Petitioner and Respondent. Petitioner's PFOF 18 is adopted in substance in paragraph 21. To the extent not adopted in the RO, the remainder of Petitioner's PFOF 18 is hereby adopted. Petitioner's PFOF 19 is adopted in paragraph 13 of the RO. Petitioner's PFOF 20 is adopted, in substance, in paragraph 16 of the RO. 21-24. Petitioner's PFOFs 21-24 are hereby adopted. Petitioner's PFOF 25 is rejected as a conclusion. Petitioner's PFOF 26 is rejected as conclusory and argumentative. This proposed finding is also irrelevant based upon facts admitted by Petitioner. Petitioner's PFOF 27 is rejected as irrelevant based upon facts admitted to by Petitioner. 28-34. Petitioner's PFOFs 28-34 are hereby adopted to the extent relevant. Based upon Petitioner's admission that the Respondent rejected all bids based on "significant irregularities," these proposals are for the most part irrelevant and unnecessary to the conclusions reached. 35. Petitioner's PFOF 35 is hereby adopted. 36-39. Petitioner's PFOFs 36-39 are adopted. 40-44. Petitioner's PFOFs 40-44 are cumulative and not necessary to the conclusions reached. Respondent's PFOF: 1-19. Respondent's PFOFs 1-19 are adopted in the RO. 20. Respondent's PFOF 20 is rejected as conclusory. 21-22. Respondent's PFOFs 21 and 22 are adopted in the RO. 23. Respondent's PFOF 23 is rejected as argument. 24-26. Respondent's PFOFs 24-26 are adopted in the RO. 27. Respondent's PFOF 27 is rejected as conclusory. 28-29. Respondent's PFOFs 28 and 29 are adopted in the RO. 30-32. Respondent's PFOFs 30-32 are rejected as conclusions and argument. Respondent's PFOF 33 is hereby adopted. Respondent's PFOF 34 is rejected as argument. Intervenor's PFOF: 1-21. Intervenor's PFOFs 1-21 are adopted in substance in the RO. Intervenor's PFOF 22 is adopted, in substance, in paragraph 4 of the RO. Intervenor's PFOF 23 is hereby adopted. Intervenor's PFOF 24 is adopted in substance. Intervenor's PFOF 25 is hereby adopted. However, Intervenor has failed to prove that the activity of NMC is not within one of the several exceptions to the requirements of Section 607.1501, Florida Statutes. COPIES FURNISHED: Seann M. Frazier, Esquire Jennifer Kujawa-Graner, Esquire PANZA, MAURER, MAYNARD & NEEL, P.A. 3081 East Commercial Avenue Fort Lauderdale, Florida 33308 R. Beth Atchison, Esquire Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500 Timothy G. Schoenwalder, Esquire BLANK, RIGSBY & MEENAN, P.A. 204-B South Monroe Street Tallahassee, Florida 32301 Harry K. Singletary, Jr. Secretary Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500

Florida Laws (2) 120.57607.1501
# 2
FIRST MASTER LESSORS, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 89-005292BID (1989)
Division of Administrative Hearings, Florida Filed:Lakeland, Florida Sep. 29, 1989 Number: 89-005292BID Latest Update: Nov. 14, 1989

The Issue The primary issue for determination is whether Respondent's decision to rescind a previous notice of award of a bid to Petitioner First Master Lessors, Inc., on the basis that the original bid was nonresponsive, was appropriate. If rescission of that bid award was proper, a secondary issue is whether Respondent was also justified in rejecting the competing bid submitted on behalf of Petitioner DSJ Realty Company Inc.

Findings Of Fact Respondent issued an Invitation To Bid in order to obtain a leasehold of 15,397 square feet of office space to house operations of its child support enforcement office in Lakeland, Florida, for a term of seven years with an option to renew the lease for two additional three year periods. The Invitation To Bid (ITB) states Respondent's reservation of the right to reject, if in the best interest of the State of Florida, any and all bids. Further, the invitation states a number of conditions that submitting bidders must meet in order for their bids to be deemed responsive. Among the stated conditions is the requirement that bids be submitted on the standardized bid submittal form enclosed in the ITB in compliance with conditions specified on that form. Further, bidders are directed to complete the bid submittal form providing acknowledgements requested by the form. Another stated condition of the ITB is the requirement that a bidder be the owner of record of the facility and parking areas offered for lease; or, if a lessee seeking to sublease, submit with the bid proposal documentation of authority to sublease the facility and parking areas. A further ITB condition requires each bid to be signed by the owner, corporate officers or legal representative of the bidding entity. Corporate, trade or partnership titles of the bidding entity are to be stamped or typewritten beside the actual signature. Bid submissions signed by an agent are required to be accompanied by written evidence from the owner of record documenting the agent's authority. All bid submittal signatures are to be notarized. Page 4 of the standardized bid submittal form enclosed in the ITB requires, in paragraph 11, that any bid offering premises for consideration (including parking areas), which are presently occupied or which will covered by other active leases on the anticipated lease effective date, must be accompanied by documentation executed by those tenants indicating their acknowledgement of the bid and their ability to vacate the premises by the proposed lease effective date. Submitting bidders are required to indicate whether this requirement is applicable to their bid. Page 4 of the standard bid submittal form contains a number of other conditions which require agreement by the submitting bidder. Proof of the bidder's agreement to those conditions is to be documented by the bidder's initials on each page of the bid submittal package and the bidder's notarized signature on page 16, the submittal form's concluding page. Among the conditions on Page 4 of the form is the agreement of the successful bidder to provide leased space to Respondent for exclusive use on a 24 hour basis, seven days per week during the term of any lease resulting from the bid. This condition further explicitly states that the space to be leased will be fully occupied during normal working hours of 8 a.m. to 5 p.m. during the week and may be fully or partially occupied at other times as necessary in Respondent's discretion. Respondent's bid request specified that bidders must offer a minimum of 65 parking spaces in conjunction with premises proposed for lease. Of those spaces, two spaces were required to meet requirements of accessibility for handicapped parking. Of the remaining spaces, 52 spaces were required to accommodate full size automobiles. All parking was required to be provided as part of the lease cost to Respondent and under the "control of the bidder, off street, suitably paved and lined." On May 16, 1989, five bids were opened, including those submitted on behalf of Petitioner DSJ Realty Company Inc. (DSJ), and Petitioner First Master Lessors, Inc. (MASTER). Out of the five bids opened, only the bids of MASTER and DSJ were determined to be responsive. After evaluation of the bids by Respondent's personnel, the bid was awarded to MASTER on July 6, 1989. On July 11, 1989, and in response to the award to MASTER, a notice of intent to protest the award was filed by counsel for Dale S. Jones, as trustee; DSJ; and Elizabethan Development, Inc. (ELIZABETHAN). By letter dated July 12, 1989, Alan Taylor filed a protest of the lease award to MASTER. That letter simply stated its efficacy as a protest with the words "[w]e hereby protest the award of lease # 590:2087 to First Master Lessors, Inc." No particular factual or legal basis for the protest was stated. Taylor is associated with ELIZABETHAN and his letter is typed on stationary of that business entity. Taylor, designated the bidder on page one of the DSJ bid submittal, was authorized to act solely on behalf of DSJ in the submission of its bid by its president, Dale S. Jones, Jr. Documentation of that authority is contained in a May 8, 1989 memorandum attached to the bid package. There is no documentation in the bid submittal package of DSJ that Taylor was empowered to act on behalf of ELIZABETHAN, or that ELIZABETHAN was authorized to act on behalf of any entity in regard to the bid submittal. While not set forth in the bid package, testimony at the final hearing establishes that Jones is the sole owner of DSJ. Subsequent to the filing of the DSJ protest, Respondent determined to reject the bids of MASTER and DSJ as nonresponsive. By letter dated August 28, 1989, Respondent informed both counsel for DSJ and MASTER of this decision. As set forth in the August 28, 1989 letter, Respondent's decision to reject the bid of DSJ was based upon the failure of DSJ's bid submittal to reflect that its agent, Alan Taylor, or the proposed lessee designated in that bid submittal, DSJ Realty Company, had control of the property offered for lease to Respondent. The August 28, 1989 letter also stated Respondent's rejection of MASTER's bid due to a lack of control of the property sought to be leased, specifically control over parking spaces to be provided in conjunction with the premises to be leased. MASTER's bid submittal stated that the bid requirements in paragraph 11 of the bid submittal form requiring documentation of acknowledgements by any existing tenants of the premises (including parking areas) offered for lease, and ability of those existing tenants to vacate the premises, was not applicable. In response to the bid requirement for 65 parking spaces, MASTER's bid proposed 17 "exclusive" spaces on site and 48 "nonexclusive" spaces off site. An attachment to the bid response was a copy of a letter dated June 10, 1983, from the First Christian Church to a predecessor of MASTER, First Bank of Lakeland. The church, located across the street from the site proposed to be leased to Respondent by MASTER, granted "permission to the First Bank of Lakeland to use our parking lot for the convenience of their employees." Subsequent to the opening of bids and receipt of DSJ's bid protest, MASTER provided Respondent with another letter from the church reciting permission for MASTER to use 48 spaces within the church parking lot for the parking of Respondent's employees and clients, provided that the church reserved the right to use those spaces at any time upon the giving of one week's written notice to MASTER. The church also reserved the right to cancel the agreement at any time upon the giving of 60 days written notice. The letter was dated May 15, 1989. Also, as established at the final hearing, yet another letter was sent to MASTER's authorized agent from the church. That letter documents the rejection by the church of any "formalization" of a reciprocal parking arrangement with regard to the premises proposed to be leased by MASTER. However, the letter, dated July 20, 1989, restated the church's consent to the use of the parking lot by tenants of the premises proposed for lease by MASTER in accordance with its previous letter of May 15, 1989. Another letter attached to the bid submittal of MASTER, is also dated May 15, 1989. Directed to Respondent's facilities services manager, this letter is signed by an individual named Geneva Pettus as "[a]gent for First Master Lessors, Inc." The letter signed by Pettus references the 1983 letter from the church and states in pertinent part: We further guarantee your parking requirements during the term of the lease and will accommodate such spaces either within our own building or other locations if changes in the above parking facilities should occur. The MASTER bid submittal contains no documentation of authority of Geneva Pettus to act as agent for MASTER. Further, as established by the proof at final hearing, the vast majority of on site spaces controlled by MASTER are leased to present tenants or their employees. Remaining unencumbered parking spaces are inadequate to meet Respondent's bid requirements. The "guarantee" by Pettus, absent her lack of authorization to act for MASTER, is further invalidated by failure of MASTER to provide acknowledgements, as required by paragraph 11 of the bid submittal form, from the existing lessees of those parking spaces controlled by MASTER which would have to be vacated in order to comply with bid requirements. The proof establishes that MASTER did not have control of a portion of the property submitted for lease consideration by Respondent, specifically the proposed parking areas. Such lack of control is nonresponsive to Respondent's bid requirements. Notably, the May 15, 1989 date of Pettus' letter coincides with the May 15, 1989 letter to MASTER from the church. Respondent's facilities service manager, involved in evaluation of the bid submittals, was understandably concerned that this letter's existence was not disclosed to Respondent's personnel prior to August 17, 1989. The position of the church as reflected in the letter caused Respondent's personnel to reevaluate the issue of whether MASTER's bid demonstrated the requisite control over the property submitted for bid consideration and concluded that such control was absent. The DSJ bid submittal contains the notarized signature of Dale S. Jones, Jr., in the space on page 16 reserved for the signature of the bidder. His signature is followed by the title "PARTNER." That term is not further described, nor is a partnership or connection of that partnership with Jones identified in the bid package. At the final hearing, Jones confirmed his signature. However, the proof fails to establish that the required initials on each page of the DSJ bid package are those of Jones. Jones was unacquainted with the bid package submitted on his behalf, having merely looked through the package before affixing his signature. Further, the bid submittal form, on page 16, has a blank space for insertion of the name of the bidder submitting the bid package. The bid package submitted on behalf of DSJ contains no name in this portion of the submittal form. Page 16 of the bid submittal form also requires that the bidder indicate the name of the entity in whose name the subsequent lease is to be written, if that entity is one other than the bidder. The bid, signed by Jones and submitted by Taylor on behalf of DSJ, contains the statement that any future lease resulting from the bid should be titled in the name of "DSJ REALTY COMPANY as managing and Leasing Agent for Crystal Lake 301 and 302 Joint Venture." Also attached to the DSJ bid submittal package is a copy of an instrument entitled "DEED TO TRUSTEE UNDER TRUST AGREEMENT." By terms of that instrument, the fee simple title to the property and appurtenances of the site of the building proposed to be leased by DSJ, was purportedly conveyed to Dale S. Jones, Jr., as "Trustee under Land Trust Agreement dated June 15, 1987". By terms of the deed, Jones is granted specific authority to convey, lease or otherwise exercise those rights to property which are commensurate with ownership. The grantor of the deed, dated July 7, 1987, is Florida Southern College. The bid package of DSJ contains no documentation that either Jones or DSJ is authorized to act as an agent on behalf of "Crystal Lake 301 and 302 Joint Venture." Further, the bid package of DSJ offers no explanation as to the identity of this entity. As established by Jones' testimony at hearing, the entities "Dale S. Jones, Trustee" and DSJ Realty, Inc., are not interrelated businesses. The DSJ bid submittal further contains no documentation of authority for ELIZABETHAN or Taylor to act as an agent on behalf of "Crystal Lake 301 and 302 Joint Venture." It is found that the bid submittal of DSJ is nonresponsive to the requirements of Respondent's ITB. In response to Respondent's letter rejecting the bids of Petitioners, counsel for both parties filed petitions dated September 8, 1989, protesting the decision and requesting administrative proceedings. The petition filed on behalf of DSJ, ELIZABETHAN, and Dale S. Jones, as Trustee, was entitled "PETITION FOR FORMAL HEARING AND FORMAL BID PROTEST" and alleges the submitting bidder to be ELIZABETHAN. The document, in support of the July 12, 1989 protest of the bid award to MASTER, sets forth specific grounds for that protest. Further, it is alleged in the petition that DSJ was appointed to act as the agent of Dale S. Jones, as trustee, in appointing ELIZABETHAN as his agent. It is found that these allegations, with regard to the identity of the submitting bidder, are not supported by any competent substantial proof; that Dale S. Jones, as trustee was not a submitting bidder; and that ELIZABETHAN was not a submitting bidder. Each petition filed in opposition to Respondent's August 28, 1989 rejection letter, was accompanied by a $5,000 cashier's check payable to Respondent. MASTER subsequently substituted this check with a surety bond. DSJ's July 12, 1989 protest of the bid award was not accompanied by any bond.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that a Final Order be entered finding the bids of MASTER and DSJ to be unresponsive; finding the cancellation of the award to MASTER to be justified; dismissing ELIZABETHAN and Dale S. Jones, as trustee, as petitioners in this proceeding; and rejecting all bids. DONE AND ENTERED this 14th day of November, 1989, in Tallahassee, Leon County, Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of November, 1989. APPENDIX The following constitutes my specific rulings, in accordance with Section 120.59, Florida Statutes, on findings of fact submitted by the parties. Petitioner Master's Proposed Findings. Petitioner MASTER's proposed findings consisted of 21 pages encompassing unnumbered paragraphs dealing with an intertwined mixture of legal conclusions, argument and proposed factual findings. Therefore, MASTER's submission cannot be treated by the Hearing Officer in this appendix on an individualized basis for each proposed finding. However, MASTER's submission has been reviewed and addressed, where possible, by the findings of fact set forth in this recommended order. Otherwise, all disputed issues of material fact have been addressed by the evidence adduced at the hearing held in this cause. Petitioner DSJ's Proposed Findings. Addressed in substance, remainder rejected as unnecessary. Rejected, unsupported by the evidence. Addressed in substance. Rejected, unnecessary to result. 7.-1I. Adopted in substance. Rejected, unsupported by the evidence. Addressed in substance. Adopted by reference. Adopted in substance. 16.-21. Not relevant inasmuch as Jones, in an individual capacity or the legal capacity of trustee or partner, was not a bidder. 22.-23. Adopted in substance. Rejected, legal conclusion, relevancy. Addressed in substance. 26 Rejected, not supported by the evidence. Taylor was authorized to act on behalf of DSJ Realty, Inc., by the corporate president. 27.-28. Rejected, not supported by the evidence; no evidence that Jones was a bidder. 29.-32. Rejected as unnecessary in view of result. 33.-42. Adopted in substance. Respondent's Proposed Findings. 1-12. Adopted in substance. COPIES FURNISHED: Jack E. Farley, Esq. Department of Health and Rehabilitative Services 4000 West Buffalo Avenue 5th Floor, Room 500 Tampa, FL 33614 Gregory L. Coler Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John Miller, Esq. General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Sam Power Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Bruce Marger, Esq. 1700 66th Street, North Suite 501 St. Petersburg, FL 33710 David H. Simmons, Esq. 120 South Orange Avenue P.O. Box 67 Orlando, FL 32602 =================================================================

Florida Laws (5) 120.53120.57255.25287.012287.042
# 4
VARIAN INSTRUMENT GROUP vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 89-005058BID (1989)
Division of Administrative Hearings, Florida Filed:Brooksville, Florida Sep. 18, 1989 Number: 89-005058BID Latest Update: Feb. 07, 1990

Findings Of Fact In July, 1989 the District published its request for bids (number 8980) for an atomic absorption spetrophotometer in local newspapers and to prospective interested parties, as shown in joint Exhibit 1 in evidence. The specifications for the instrument were included in the bid package and were authored by Mark Rials, the District's Laboratory Supervisor. The District received two bids for the instrument in response to the request for bids, one from Varian for approximately $57,000 and one from Perkin-Elmer for approximately $59,900. Mark Rials evaluated the bids. Upon evaluation it was determined that the Varian instrument proposal did not meet bid specifications in three major areas. The specifications required a system capacity of 40 megabytes, hard drive capability. The capacity offered by Varian in its bid was for 20 megabytes. The specifications required a combination of a 5 1/4 inch disk drive for its computer system as well as a 3 1/2 inch disk drive. Varian only bid the 3 1/2 inch diskdrive. It did not offer the 5 1/4 inch disk drive which was required. Additionally, at item IX of the specifications, the District required that a list be submitted with the bid which stated, on an item-by-item basis, how the instrument met or exceeded the specifications. Each item in the specifications had been carefully selected to insure optimum performance for the laboratory so that exceptions to the specifications were required to be noted and attached in the bid response. Varian failed to conform to this item of the specifications. This item allowed a vendor to describe in its bid response how it could differently meet the specifications in a better manner or even exceed the specifications, but Varian failed to provide this itemized list. It was also determined that the Varian bid did not conform with the specifications of item IV page 4 of the invitation to bid document concerning the provision of service manuals, system and application software documentation, methods, manuals, parts catalogs, supplies, accessories, catalog, and training manuals. Conversely, it was determined that the Perkin-Elmer bid was responsive in all respects, met the bid specification in these major categories and was the most responsive bidder. After witness Rials conducted the evaluation of the bids, in terms of compliance with the specifications, he and the District determined that the Perkin-Elmer bid was the lowest, responsive bidder which met all specifications. It duly published the intended award and notified all bidders of the bid results. In this evaluation and award process it was demonstrated that the District followed all applicable procedures in its rules and policies concerning evaluation and award. Varian timely filed an objection to the award of the bid; and in accordance with its normal bid protest procedures, the District scheduled a conference between representatives of Varian and District representatives to review Varian's bid. Varian made several statements at that meeting which constituted a substantial deviation from the bid package it had earlier submitted and amounted to an attempted restructuring of its bid in an effort to meet bid specifications. The District declined to countenance this effort and adhered to its initial intent to reject the bid which was submitted by Varian and to not allow the attempted material deviations to be ascribed to Varian's bid, after the point of bid opening and announcement of award. In summary, based upon the bid specifications issued by the District the evaluator's determination concerning the specifications that the evaluator drafted was that the Varian instrument failed to meet bid specifications because of the major deficiencies in the areas found above, regarding systems capacity, computer disk drive availability, and specification response. It has clearly been demonstrated by competent substantial evidence that the District's decision to reject Varian's bid was a reasonable one. It was based solely on a fair comparison of the response of the two bids to the specifications contained in the invitation to bid and notice to all potential vendors. In consideration of the facts established by the evidence in this record, it is found that the bid by Perkin-Elmer substantially met all bid requirements or specifications, even though the Perkin-Elmer bid was the second low bidder in terms of dollar cost. Since the low-cost bidder, Varian, failed to meet major bid specifications, the facts demonstrate that the Perkin-Elmer bid was the most responsive of the two bids at issue and is, therefore, the best bid. Consequently, award should be given to the Perkin-Elmer bid for the instrument in question.

Recommendation Having considered the foregoing findings of fact and conclusions of law, the evidence of record, the candor and demeanor of the witnesses, and the pleading and arguments of the parties it is therefore RECOMMENDED: That the Southwest Florida Water Management District issue a final order denying the petition filed by Varian Instrument Group and awarding bid number 8980 to Perkin-Elmer Corporation, as the lowest, responsive bidder. DONE and ENTERED this 6th day of February, 1990, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of February, 1990. APPENDIX Respondent's Proposed Findings of Fact 1-9 are accepted. Petitioner Filed No Proposed Findings of Fact. COPIES FURNISHED: Mr. Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899 Mickey McAllister District Sales Manager Varian Instrument Group 505 Julie Rivers Road, Suite 150 Sugar Land, TX 77478 A. Wayne Alfieri, Esquire Edward B. Helvenston, Esquire Assistant General Counsel Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899

Florida Laws (1) 120.57
# 5
TAMCO ELECTRIC, INC. vs PINELLAS COUNTY SCHOOL BOARD, 13-002153BID (2013)
Division of Administrative Hearings, Florida Filed:St. Petersburg, Florida Jun. 13, 2013 Number: 13-002153BID Latest Update: Nov. 13, 2013

The Issue Whether Respondent's action to reject all bids submitted in response to ITB 13-803-206, relating to the removal and replacement of the public address system at Pinellas Park High School, is illegal, arbitrary, dishonest, or fraudulent, as alleged in the Amended Petition.

Findings Of Fact On March 4, 2013, ITB was issued by Respondent for work related to the removal and replacement of the public address system at Pinellas Park High School in Largo, Florida. According to the Special Conditions portions of the ITB, the "scope" of the project is to "[p]rovide labor and materials to remove and replace the auditorium sound system as per plans and specifications by Keane Acoustics, Inc." The ITB was assigned bid number 13-803-206 by Respondent. Bids for the contract were to be submitted to Respondent by 3:00 p.m., April 11, 2013. Bids for the project were timely received from two companies. The first company, Becker Communications, Inc., d/b/a BCI Integrated Solutions (BCI), submitted a bid in the amount of $130,756.66. Petitioner submitted a bid in the amount of $116,000.00. There is a section of the ITB titled "special conditions." The special conditions provide in part that "[t]his is an ALL or NONE bid [and] [t]he entire contract shall be awarded to the lowest responsive and responsible bidder meeting the specifications." On April 22, 2013, Respondent posted a notice advising of its intent to award the contract to BCI. Although Petitioner submitted the lowest bid, Respondent determined that Petitioner's bid was non-responsive because the bid failed to include "proof of 5 years [of] experience with this type of work" as required by the special conditions of the ITB. Petitioner interpreted this provision as requiring five years of experience as a certain type of general contractor, which Petitioner had, whereas Respondent intended for the ITB to convey that five years of experience related to the removal and installation of audio equipment was the desired type of experience. Petitioner's failure to respond to the ITB in the manner contemplated by Respondent was a technical, nonmaterial irregularity.1/ Numbered paragraph six of the General Terms & Conditions of the ITB provides in part that Respondent "expressly reserves the right to reject any bid proposal if it determines that the . . . experience of the bidder, compared to work proposed, justifies such rejection." On April 24, 2013, Petitioner provided to Respondent a notice advising of its intent to protest the award of the contract to BCI. On May 3, 2013, Petitioner filed its formal protest challenging Respondent's intended action of awarding the contract to BCI. Petitioner's formal protest enumerated several grounds. Of particular concern to Respondent were Petitioner's assertions that the ITB was "inconsistent with Florida law since bidders [were] not required to submit a List of Subcontractors by the time of opening bid"2/ and that provisions of the ITB were ambiguous with respect to the type of experience required to qualify for bidding.3/ Prior to receiving Petitioner's protest, Respondent was unaware of the fact that its bid specifications governing the disclosure of subcontractors did not comply with Florida law. Upon consideration of Petitioner's grounds for protest, Respondent determined that the ITB, as alleged by Petitioner, failed to comply with section 255.0515, Florida Statutes (2012),4/ and that there was ambiguity in the language regarding the experience requirements for bidders.5/ Respondent refers to the problems with the ITB as "procedural errors." These procedural errors will be referred to herein as "irregularities" as this term is more in keeping with the nomenclature of this area of jurisprudence. Given the ITB's irregularities, Respondent decided to reject all bids. In explaining Respondent's rationale for rejecting all bids, Michael Hewett, Respondent's Director of Maintenance,6/ testified that "the [irregularities] were such that [they] potentially could give an unfair advantage to one bidder over another." As for the issue related to the requirements of section 255.0515, Mr. Hewett explained that neither of the two bidders submitted a listing of subcontractors. It would have been competitively disadvantageous to BCI if Petitioner were able to successfully argue that BCI should be disqualified for failing to provide a listing of subcontractors when Petitioner also failed to provide such listing. During the same approximate time that the ITB in the present case was issued, Respondent issued an ITB for nearly identical work to be performed at one of its other facilities (Palm Harbor). In all material respects, the Palm Harbor ITB was identical to the one at issue herein. Unlike the present case, BCI was the sole bidder for the Palm Harbor project and this distinguishing fact reasonably explains why Respondent did not reject BCI's bid for the Palm Harbor Project even though the ITB therein was plagued with the same irregularities found in the present case.7/

Recommendation Upon consideration of the above findings of fact and conclusions of law, it is RECOMMENDED: That the Pinellas County School Board enter a final order finding that the rejection of all bids submitted in response to ITB 13-803-206 was not illegal, arbitrary, dishonest, or fraudulent, and dismissing Tamco Electric, Inc.'s instant protest. DONE AND ENTERED this 16th day of October, 2013, in Tallahassee, Leon County, Florida. S LINZIE F. BOGAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 16th day of October, 2013.

Florida Laws (3) 120.569120.57255.0515
# 6
ALL AMERICAN COMPANIES vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-002776BID (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 12, 2002 Number: 02-002776BID Latest Update: Oct. 25, 2002

The Issue At issue in this proceeding is whether the Department of Environmental Protection's decision to reject all bids submitted for the project entitled BDRS 52-01/02 was illegal, arbitrary, dishonest, or fraudulent.

Findings Of Fact Parties Petitioner, All America Homes of Gainesville, Inc. (All America), is a corporation doing business in the State of Florida. All America submitted a timely written bid in response to the Department's ITB and filed timely protests to the Department's actions. The Respondent, the Department of Environmental Protection, is an agency of the State of Florida which manages and operates state parks under its jurisdiction, and solicits construction projects in state parks, pursuant to Chapter 258, Part I, Florida Statutes, through its Division of Recreation and Parks, Bureau of Design and Recreation Services. The ITB In November, 2001, the Department issued an ITB on a construction project entitled Hillsborough River State Park Concession Building, project number BDRS 52-01/02. The ITB included the Bid Specifications for the project. Bids were required to be submitted no later than 3:30 p.m. on Tuesday, December 18, 2001, at the Bureau's Tallahassee, Florida, office. The written Specifications define several terms, including, but not limited, to the following: ADDENDUM: A written explanation, interpretation, change, correction, addition, deletion, or modification, affecting the contract documents, including drawings and specifications issued by the OWNER [Department] and distributed to the prospective Bidders prior to the bid opening. ALTERNATE BID: Separate optional bid item for more or less project requirement used for tailoring project to available funding. Also may consist of alternate construction techniques. BASE BID: Formal bid exclusive of any alternate bids. BID FORM: The official form on which the OWNER requires formal bids to be prepared and submitted. ORAL STATEMENTS: Verbal instruction. NOTE: No oral statement of any person, whomever shall in any manner or degree modify or otherwise affect the provisions of the contract documents.[1] SEALED BID: The formal written offer of the Bidder for the proposed work when submitted on the prescribed bid form, properly signed and guaranteed. The Bid Specifications also contained the following relevant sections: Alternatives If the OWNER wishes to learn the relative or additional construction cost of an alternative method of construction, an alternative use of type of material or an increase or decrease in scope of the project, these items will be defined as alternates and will be specifically indicated and referenced to the drawings and specifications. Alternates will be listed in the bid form in such a manner that the Bidder shall be able to clearly indicate what sums he will add to (or deduct from) his Base Bid. The OWNER will judge for himself that such alternates are of comparable character and quality to the specified items. The Order of the alternate may be selected by the Department in any sequence so long as such acceptance out of order does not alter the designation of the low bidder. ADDENDA If the Consultant[2] finds it would be expedient to supplement, modify or interpret any portion of the bidding documents during the bidding period, such procedure will be accomplished by the issuance of written Addenda to the bidding documents which will be delivered or mailed by the OWNER'S Contracts section to all bidders who have requested bidding documents. Interpretation No interpretation of the meaning of the drawings, specifications or other bidding documents and no correction of any apparent ambiguity, inconsistency or error therein will be made to any Bidder orally. Every request for such interpretation or correction should be in writing, addressed to the Consultant. All such interpretations and supplemental instructions will be in the form of written Addenda to the bidding documents. Only the interpretation or correction so given by the Consultant in writing and approved by the OWNER shall be binding, and prospective Bidders are advised that no other source is authorized to give information concerning, or to explain or interpret, the bidding documents. B-16 Bid Modification Bid modification will be accepted from Bidders, if addressed as indicated in Advertisement for Bids and if received prior to the opening of bids. No bid modification will be accepted after the close of bidding has been announced. Modifications will only be accepted if addressed in written or printed form submitted with the bid in sealed envelopes. Telegrams, facsimiles, separate sealed envelopes, written on printed modifications on the outside of the sealed envelopes will not be accepted. All bid modifications must be signed by an authorized representative of the Bidder. Modification will be read by the OWNER at the opening of formal bids. B-21 Rejection of Bids The OWNER reserves the right to reject any and all bids when such rejection is in the interest of the State of Florida, and to reject the bid of a bidder who the OWNER determines is not in a position to perform the work. B-23 Award of Bid . . .The qualified Bidder submitting the lowest bid will be that Bidder who has submitted the lowest base bid plus any selected alternates. . . . The OWNER reserves the right to waive any minor irregularities in bids received when such waiver is in the interest of the OWNER. The Award of Bid will be issued by the OWNER only with responsible Bidders, found to meet all requirements for Award of Bid, qualified by experience and in a financial position to do the work specified. Each bidder shall, if so requested by the OWNER, present additional evidence of his experience, qualifications and ability to carry out the terms of the Agreement. (Emphasis in original, except for Section B-10.) The Bid Form is included with the Specifications and provides in part: Base Bid: Furnish labor, equipment, Lump Sum $ supervision and material to construct a new concession building of 2940 square feet located at the Hillsborough River State Park along with the alteration of the existing concession building according to plans and specifications. Alternate #1: Furnish labor, equipment, Add Amt.$__ supervision and material to renovate the existing concession building according to plans and specifications. There is a separate section for "Allowances," i.e., Section 01210, for the Hillsborough State Park. This section provides in part: SECTION 01210 – ALLOWANCES * * * 1.2 SUMMARY This Section includes administrative and procedural requirements governing allowances. Certain materials and equipment are specified in the Contract Documents and are defined by this [sic] specifications as material and labor to be provided against a pre-determined allowance. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order. * * * 3.3 SCHEDULE OF ALLOWANCES A. Allowance #1: Include in the base bid an allowance for the purchase and installation of. . . kitchen equipment. . . . The total dollar amount of the allowance to be included shall be $12,000.00. There is also a separate section for "Alternates," i.e., section 01230, for Hillsborough River State Park, which provides in part: SECTION 01230 – ALTERNATES * * * 1.3 DEFINITIONS Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if OWNER decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum. . . . . 3.1 SCHEDULE OF ALTERNATES A. Alternate No. 1: Renovate the existing concession building in its entirety as shown in the drawings and specified herein. (emphasis added.) At this stage of the bidding documents, the contractor/bidder is requested to provide a Base Bid/Lump Sum on the Bid Form to "[f]urnish labor, equipment,. . .to construct a new concession building," and to provide an additional and separate amount for Alternate No. 1 to "[f]urnish labor, equipment, . . . to renovate the existing concession building." On December 13, 2001, the Bureau issued "Addendum No. One (1)" (written by the architect) to the ITB on the "Hillsborough River State Park – Concession Building." The Addendum contained the following relevant sections: Specification Section 01210: Allowances Add the following new paragraph 3.3.B: ”Allowance #2: Include in the base bid an allowance for the renovations of the existing concession building; renovations shall be defined by the Owner. The total dollar amount of the allowance to be included shall be $25,000." Specification Section 01230: Alternates Modify paragraph 3.1.A. as follows: "Alternate No. 1: Renovate the existing concession building as defined by the Owner, and as provided for under Section 01210, Allowances." (emphasis added.) Each contractor was required to sign the Addendum and attach it to the bid. By definition, and pertinent here, an addendum is an additional written instruction to a contractor during the bidding process. Based on the weight of the evidence, the purpose of this Addendum was to require the contractor to include a $25,000.00 Allowance (for Allowance # 2) in the Base Bid, for the work which might be performed if the Department requested the work to be performed for Alternate No. 1, i.e., for the renovation of the existing concession building.3 (The Department's architect decided it would cost approximately $25,000.00 to renovate the existing concession building, hence Allowance # 2.) In other words, the Addendum does not have a specific dollar amount to be included for Alternate No. 1. Rather, the $25,000.00 is an Allowance for the work described as Alternate No. 1, but the amount is to be included in the Base Bid and not as a separate line item, dollar amount. But, importantly, the Addendum did not delete the potential work to be performed as described in Alternate No. 1, although Mr. Bowman and others believed that the Addendum deleted Alternate No. 1. It deleted the necessity to place a specific dollar amount on the Bid Form for Alternate No. 1. (Mr. Bowman is a registered Professional Engineer and a licensed contractor. He has worked for the Department for 15 years and has served as Bureau Chief for two years. He supervises the contract section and the design section, which was responsible for preparing the technical plans and specifications and bidding out the job.) Mr. Bowman offered the following explanation why he believed the Addendum was confusing: Okay. I think the confusion that was created, you know, I think the addendum in itself, you know, said add $25,000 to the base bid, but then on the bid form, it still had the space down there for alternate number one, which alternate number one, which alternate number one had become $25,000 that was to be allowed for the concession building, and I think that's where the confusion came in because I think they were still confused, that they weren't really sure that they should not put that 25 down there but they knew they had been told in the addendum to do it and I think that's the reason for the notes and we got to the correspondence on the bid form, was they wanted to make sure that that's what we were wanting to do. And I think that's where the confusion came in. Like I said, it's always, if you could go back and do it again, it would be much wiser just to issue a whole new bid form and then we wouldn't be here today. But, we didn't do that. Okay. So, that's why we are here. The language in this Addendum, when read with the original Bid Specifications, apparently caused confusion with some of the bidders on the project. Several bidders called Marvin Allen (an architect and project manager for the Department's Bureau of Design and Recreation Services) prior to the submission of the bids, to clarify how the $25,000.00 Allowance should be shown on the Bid Form. (Mr. Allen did not author any of the specifications, including the Addendum.) He was listed as a contact person. He did not contact any bidders. But, Mr. Allen recalled telling each bidder who asked that the Allowance of $25,000.00 should be included in the Base Bid. But, he does not recall the names or numbers of the bidders who called, "possibly" three, four or five. Mr. Allen believed the Addendum was clear. According to Mr. Allen, the bidders who called him found the Addendum confusing. The oral responses to the bidders can be construed as interpretations of the Addendum. However, pursuant to Section B- 10 of the Specifications, any such interpretations were required to "be in the form of written Addenda to the bidding documents." Also, any such questions should have been in writing. If Section B-10 were complied with, all bidders would have been potentially on the same footing, or, at the very least, would have had access to a written clarifying document. Opening of the Bids On December 18, 2001, the bids were opened by Mike Renard, Contracts Manager with the Bureau of Design and Recreation Services, and Susan Maynard, Administrative Assistant. Mr. Dwight Fitzpatrick, a representative of All America, also attended the bid opening. The Bid Form submitted by Nelco showed a Base Bid of $355,478.00 (Lump Sum $355,478.00), and also showed an amount of $25,000.00 on the Alternate # 1 line (Add Amt. $25,000.00). See Finding of Fact 6. (It was clear to Mr. Renard that the $25,000.00 should have been included on Nelco's Base Bid. But Mr. Renard believed that Nelco submitted a responsive bid because the Department only accepted the Base Bid. Mr. Bowman agreed.) Nelco was the only one of five bidders to have a dollar amount in the Alternate #1 line under "Add Amt. $ ." All America submitted the second lowest Base Bid of $362,000.00. There was also a hand-written note on the All- America Bid Form that stated: "Addenda # 1 instruction to place $25,000 allowance in both Base Bid and as alternate # 1." Another hand written note was located below the "Add Amt. $-0-" line: "amount added in Base Bid with $25,000 allowance per Marvin Allen." The Department considered All America's bid responsive. It is a fair inference that three out of five of the other Bid Forms contained language indicating that the bidders were relying on Addendum No. One by placing the $25,000.00 Allowance in the Base Bid.4 It is uncertain whether they did so in light of the instructions of Mr. Allen concerning how to complete the Bids Forms. However, given the nature of the calls to Mr. Allen, there is a reasonable inference that there was some confusion among some of the bidders. The Department determined that Nelco submitted the lowest Base Bid, but the Department's staff had a question as to whether Nelco had included the $25,000.00 in its Base Bid. After conferring with his superiors, Mr. Renard was instructed to call Nelco to make certain that its Base Bid included the Allowance amount ($25,000.00). Mr. Renard spoke with Steve Cleveland, Nelco's Project Manager, "to verify the fact that [Nelco] had the allowance in their base bid." Mr. Cleveland orally confirmed that Nelco's Base Bid included the $25,000.00 Allowance. Mr. Renard asked Mr. Cleveland to send him a letter verifying this statement. Mr. Renard viewed this inquiry as a request for clarification or verification, not an opportunity for Nelco to modify its bid. Mr. Bowman agreed. (Mr. Renard did not believe Addendum No. 1 was confusing.) In a letter dated December 20, 2001, Mr. Cleveland confirmed that Nelco’s Base Bid of $355,478.00 included the Allowance amount and that Nelco could still perform the contract if the $25,000 Allowance was removed from its Base Bid pursuant to the ITB, i.e., that Nelco would perform the contract for $355,478.00 less $25,000.00, or $330,478.00, if the Department did not accept Alternate # 1 and the Allowance. (An alternate does not have to be accepted by the Department.) According to Mr. Renard, Mr. Cleveland never mentioned modifying, changing, or altering Nelco's bid. The Department only accepted the Base Bid for each bid. Mr. Renard did not consider it unusual to call a bidder or contractor to verify information to determine whether they can or cannot perform the work at the stipulated price. He considered it common to make this inquiry. Also, it was common in Mr. Bowman's experience to call a bidder to get clarification. Mr. Renard was not aware of any statute or rule which authorizes the Department to request clarification from a bidder after the bids are opened. Mr. Renard was more familiar with the bid forms than Mr. Allen. After receiving Mr. Cleveland's letter, the Department determined that Nelco submitted the lowest Base Bid and that the $25,000.00 amount that Nelco wrote on the Bid Form Alternate # 1 line, was a minor irregularity in the bid which the Department, as the Owner, could waive pursuant to the ITB. On December 20, 2001, the Department posted the Tabulation of Bids showing the anticipated award of the contract to Nelco. At the hearing, an unsigned letter on Department letterhead was introduced, which was addressed to Nelco and stated that Nelco submitted the apparent low bid. However, Mr. Renard testified that these letters are prepared routinely, but not mailed out without his signature. Mr. Renard did not recall signing the letter or ever sending out such a letter to Nelco. On December 21, 2001, the Department received a Notice of Intent to Protest letter from Allen E. Stine, the President of All America. In his letter, Mr. Stine stated that Nelco’s bid should have been rejected for failure to follow the specified format as per Addendum No. 1, or adjusted to have the $25,000.00 amount added to their Base Bid. Bid Protests All America filed a written formal bid protest on January 4, 2001. On January 9, 2001, Cindy Otero of All America, notified Mr. Renard by letter, and stated that Mr. Stine was available for a hearing regarding the bid protest. On January 28, 2002, Mr. Renard returned All America's check for the bond, stating that it was unnecessary. Mr. Stine recounted a number of unanswered telephone calls after the first protest was filed. During one conversation, Mr. Renard recalled Mr. Stine saying to him, "You can't do this, you can't do this." After receiving the first formal protest, the Department staff consulted with legal staff and reviewed the documents and bid procedures. Based on the number of questions received concerning the Addendum and the hand-written notes on several of the bid forms, Mr. Bowman, Bureau Chief, determined that the bid documents were confusing and ambiguous. (Mr. Bowman stated that this was their first bid protest in his 15 years with the Department.) Therefore, Mr. Bowman decided that it would in the best interest of the State of Florida to reject all of the bids pursuant to the Bid Specifications. Mr. Bowman felt that the ITB should be re-written in order to make it clearer and allowing all of the bidders to re-bid the project without any confusion or ambiguity. Mr. Stine stated that his "senior estimator" told him that the bid language "could be confusing." He and his "senior estimator" had a discussion about whether the Allowance should have been placed in the Base Bid or not. At the time of submission of All America's bid, Mr. Stine was clear that the Allowance should be placed in the Base Bid, especially after calling Mr. Allen. But, his senior estimator was not so clear. In order to appease him, Mr. Stine placed the hand-written note on All America’s proposal. Mr. Stine essentially, "cleaned" up his proposal. At the hearing, Mr. Bowman testified Rule 60D-5.0071, Florida Administrative Code, see Conclusion of Law 59, does not list "confusing or ambiguous bid specifications" as one of the circumstances allowing for the rejection of all bids. However, Mr. Bowman later stated during the hearing that he believed the circumstances listed in Rule 60D-5.0071 were not the only circumstances authorizing the Department to reject all bids. Mr. Bowman testified that he believed that general confusion among the bidders caused by the ambiguous ITB constituted sufficient grounds for rejecting all bids. Mr. Bowman was advised by legal counsel that rejecting all of the bids would probably result in another bid protest by Nelco, All America, or both. Thus, the Department decided to delay addressing All American’s first protest until after posting the rejection of all bids and receiving the subsequent protests, so that all of the protests could be resolved at once in an efficient and economical manner. Notwithstanding the Department's justifications for rejecting all bids and not proceeding on All America's initial protest, the record is unclear why the Department waited several months to reject all bids. On May 13, 2002, the Department posted the rejection of all bids. On May 16, 2002, the Department received a formal written protest of the rejection of all bids filed by All America. On May 17, 2002, Jerome I. Johnson, attorney for the Department, contacted Mr. Robert A. Lash, All America's counsel at the time, concerning the resolution of All America’s formal protest. (Before the final hearing, Mr. Lash, with All America's consent, withdrew as counsel for All America.) The parties agreed to suspend formal bid protest procedures until a meeting could be held between the parties in an attempt to resolve the protests. Mr. Johnson sent a letter dated May 21, 2002, to Mr. Lash confirming this conversation. On June 26, 2002, a meeting was held among the Department staff, legal staff, and Mr. Lash and Mr. Stine, representing All America. The parties were unable to resolve the protests. At the conclusion of the meeting, the parties agreed that formal protest procedures would not be implemented until Mr. Stine could confer further with his counsel. In a letter dated July 5, 2002, Mr. Lash stated that his client wished to proceed with formal protest procedures and requested an administrative hearing on the protests. Are the Specifications and Bid Documents Ambiguous and Was There Confusion? The parties stipulated that "[t]he Addendum language was confusing," notwithstanding the testimony of several witnesses that they were not confused. The Department's determination that the bid Specifications, including the Addendum, and the Bid Form, which remained unchanged after the Addendum was issued, were confusing and ambiguous, is supported by the weight of the evidence. This is particularly true regarding the Bid Form. The Addendum required the bidder to include an Allowance of $25,000.00 in the Base Bid for work described as Alternate # 1. But the Bid Form was unchanged to reflect the Addendum changes. The Bid Form retained a line for the bidder to submit an additional amount for Alternate # 1. Further, it appears that several bidders were confused, including, Mr. Stine, who spoke with Mr. Allen and requested and received clarification. Further, it is unclear whether all of the bidders, including Nelco, were aware of the oral interpretations or clarifications of the Addendum rendered to some of the bidders. Rejection of All Bids Based upon the foregoing, given the standard of review in this proceeding discussed in the Conclusions of Law, the weight of the evidence indicates that the Department's action, in rejecting all bids, was not illegal, arbitrary, dishonest, or fraudulent. The Department's staff was well-intended and made some mistakes along the way, e.g., by not changing the Bid Form, which they readily admit. But there was a rationale for rejecting all bids under the circumstances.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department issue a final order dismissing All America’s Petition to Prevent Rejection of Bids and Award Contract to Petitioner and denying All America's request for attorney’s fees and costs. DONE AND ENTERED this 24th day of September 2002, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of September 2002.

Florida Laws (3) 120.569120.57120.595
# 7
ANSWERPHONE OF FLORIDA, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-006073BID (1988)
Division of Administrative Hearings, Florida Number: 88-006073BID Latest Update: Jan. 12, 1989

The Issue Whether the Petitioner was the lowest responsive bidder in Bid No. 88-8-1, and therefore entitled to the contract award. Whether the special conditions set forth in the bid documents were timely objected to by the Petitioner, and so ambiguous as to warrant a rejection of all bids in Bid No. 88-8-1.

Findings Of Fact The Department sent invitations to bid in Bid No. 88-4-2 to various providers of telephone answering services within the Brevard County area. The purpose of the invitations was to obtain the lowest responsive bid for an after- hours telephone answering service for a one year period at the Department's Monroe Center in Cocoa Beach, Florida. When the results of the bidding were made known at the public bid opening, Answerphone's bid was recommended for the award as the low bidder. On June 16, 1988, the bidders were notified by mail that the bid would not be awarded as recommended at the public bid opening. The bidders were told that the bids were being reevaluated, and they would be notified later as to when the award would occur. On June 24,1988, the bidders in Bid No. 88-4-2 were notified that the Department rejected all bids because of the belated discovery of inherent ambiguities in the solicitation which made it impossible for the Department to determine the lowest and best bid. The Department did not receive any notices of protest based upon its decision to reject all bids, and the decision became final seventy-two hours after the bidders were notified of the rejection. New bid specifications were created, and the Department sent invitations to bid to Bid No. 88-8-1 to the same list of providers who had received invitations in Bid No. 88-4-2. In paragraph 2 of the new invitation to bid, prospective bidders were notified that questions concerning specifications should be directed in writing to 705 Avocado Avenue, Cocoa, Florida. The invitation cautioned that no interpretation of the specifications should be binding on the Department unless provided in writing. Paragraph 4 of the special bid conditions attached to the invitation allowed the bidders to orally present questions about the bid requirements at the pre-bid conference held on August 30, 1988. Paragraph 6 of the special bid conditions required prospective bidders to file a notice of protest within seventy-two hours after receipt of the bid solicitations if there were concerns about the reasonableness, necessity, or competitiveness of the terms and conditions of the invitation to bid. The Petitioner was represented at the conference and the Department was asked to explain what was meant by the specification which required that the system have the capability of receiving and patching or paging multiple calls at one time if necessary. The Petitioner's representative was told that the system must be able to handle multiple calls at one time without losing a call. The provider should have an adequate system of holding, handling, and routing these calls as specified in items one through four of the list of services required in the bid documents. The Answerphone representative indicated to the Department that all of his questions had been satisfactorily answered before the pre-bid conference was brought to a close. No requests were made to the Department to place its explanation in writing and no written interpretation was provided. A notice of protest by Answerphone about the specifications in the bid solicitation was not filed with the Department prior to the Department's acceptance of bids in Bid No. 88-8-1. When the bids were opened on September 6, 1988, Elite Answer Service, Ltd., was the apparent responsive low bidder in Bid No. 88-8-1. Answerphone filed a protest to contest the award because Elite does not have the technological capacity to complete the contract under the specifications, as interpreted by Answerphone. During the administrative hearing, it was learned that the Department meant the following interpretation to be given to its specification which requires the service to handle multiple calls: During after hours, the Department has one telephone line and one telephone number linked to an answering service. When an incoming call to that number is received by the service, no other callers can dial that number and gain access to the service. The second caller will receive a busy signal. The service must have the capacity to take the call which has been received and call the necessary people at other telephone numbers who might need to speak with each other or the caller, together or separately. Therefore, the service must be able to place various people on hold at different times in the sequence, and patch the appropriate people together at the proper times when the service has been directed to do so. Answerphone interpreted the specifications to mean that the service should be able to handle more than one incoming call to the one local HRS telephone number and telephone line which is available to the public at night. For example, if three different calls were dialed to the local number, all three would be received by the service instead of two receiving a busy signal. The service would then proceed to dispatch the different callers to all of the different people as described above in paragraph 14 of the Findings of Fact. Answerphone has the technological capacity to accomplish this feat. Elite does not.. Answerphone's interpretation of the bid specifications was an untenable one in that it restricted competition instead of promoting it. This is contrary to the clear intent of the Department as set forth in the invitation to bid. The bid specifications were clear and unambiguous in that the Department's requirements from the after-hours answering service were to begin after the dialer's telephone call rang into the answering service. The Department's opportunity to handle more than one incoming call dialed during the time the one line at Monroe Center was already in use was never addressed in the specifications. The mistake in the interpretation of the bid specifications belonged to the petitioner. Paragraph 4(c) of the general conditions place the risk of mistake on the Petitioner. Opportunities to correct possible mistakes in interpretation by the prospective bidders were provided during the bid process. The Petitioner did not avail itself of these opportunities.

Florida Laws (3) 120.53120.57287.057
# 8
DIVERSIFIED DESIGN ENTERPRISES vs SEMINOLE COUNTY SCHOOL BOARD, 90-002357BID (1990)
Division of Administrative Hearings, Florida Filed:Sanford, Florida Apr. 20, 1990 Number: 90-002357BID Latest Update: May 22, 1990

The Issue The issue in this case is whether Respondent properly rejected the bid of Petitioner.

Findings Of Fact Respondent issued on February 28, 1990, an invitation to bid concerning the installation of bleachers at a high school ("ITB"). The ITB was duly advertised. Among the bidders was Interkal, Inc., which is a manufacturer of bleachers. The Interkal bid, which was timely submitted, was executed by its president. The Interkal bid contained a bid bond naming Interkal as principal and a certification from the secretary of Interkal reflecting a corporate resolution authorizing the execution of all bid documents on behalf of Interkal by its corporate officers. The Interkal bid disclosed two subcontractors. The supplier was shown as Interkal, and the erector was shown as Petitioner. Petitioner is the authorized factory representative for Interkal in Florida. As such, Petitioner solicits business and installs and removes bleachers on behalf of Interkal. As compensation, Petitioner receives commissions for such work from Interkal. However, the shareholder and chief executive officer of Petitioner is not a shareholder or officer of Interkal. In addition, Petitioner is not authorized to execute bid documents on behalf of Interkal. Petitioner is no more than a Subcontrator of Interkal. The bidder in this case was Interkal, not Petitioner, even though Petitioner handled much of the paperwork or its manufacturer. When an unrelated bidder was awarded the contract, Petitioner filed a formal written protest in its name. Interkal has not participated as a party in the subject proceeding.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that Respondent enter a Final Order dismissing the petition of Diversified Design Enterprises. ENTERED this 22nd day of May, 1990, in Tallahassee, Florida. ROBERT D. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of May, 1990. COPIES FURNISHED: Ned N. Julian Stenstrom, McIntosh, et al. P.O. Box 1330 Sanford, FL 32772-1330 William Merkel, President Diversified Design Enterprises 321 N.E. Second Avenue Delray Beach, FL 33444 Robert W. Hughes, Superintendent Seminole County School Board 1211 Mellonville Avenue Sanford, FL 32771

Florida Laws (2) 120.53120.57
# 9
CHD MARKETING GROUP AND NORLAKE, INC. vs PALM BEACH COUNTY SCHOOL BOARD, 92-003135BID (1992)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida May 22, 1992 Number: 92-003135BID Latest Update: Dec. 14, 1992

Findings Of Fact Respondent issued an invitation to bid on March 13, 1992. Bid number SB 92-244I involved the disassembly and removal of an existing walk-in freezer and the furnishing and installation of a new walk-in freezer at Coral Sunset Elementary School. The invitations to bid provided in paragraph Y of the Special Conditions: Failure to file a specification protest within the time prescribed in Florida Statutes 120.53 3.(b) shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. (sic) Bid specifications were included in the invitations to bid issued on March 13, 1992. Twenty-three bids were solicited. There were five responses. One of the responses was submitted by Choice Restaurant Equipment, Inc. ("Choice"). Choice is a vendor for equipment manufactured by Petitioner, Nor-Lake, Inc. ("Nor-Lake"). Nor-Lake is an out-of-state corporation with manufacturer's representatives in numerous states including Florida. 4, Petitioner, CHD Marketing Group ("CHD"), is the manufacturer's representative for Nor-Lake in Florida. CHD represents no other manufacturer of the product included in the bid response. Choice is a sales agent for CHD and other manufacturer's representatives in Florida. Choice sells the products of a variety of manufacturers but is the exclusive sales agent for CHD pursuant to a verbal agency agreement. Choice timely submitted a bid for bid number SB 92-244I on April 8, 1992, prior to the bid deadline of 2:00 p.m. on the same day. The successful bidder submitted its bid by Federal Express at 4:51 p.m on April 8, 1992. Respondent's Department of Purchasing and Stores (the "Department") had stated on March 13, 1992, when the invitations to bid were issued, that bid responses must be received by the Department no later than 2:00 p.m. on April 8, 1992, at the Department's address at 3980 RCA Boulevard/Suite 8044, Palm Beach Gardens, Florida, 33410-4276. Prior to April 8, 1992, the Department relocated to a new facility at 3326 Forest Hill Boulevard, West Palm Beach, Florida. The new address was posted at the old location and Department representatives were present at the old address to accept walk-in bids. Federal Express first attempted to deliver the successful bid at the Department's old address at 10:30 a.m. on April 8, 1992. Federal Express delivered the successful bid to the Department's new address at 4:51 p.m. At 2:00 p.m. on the same day, The Department announced that all bids were in and opened the bids that had been delivered. The successful bid and one other bid were delivered on April 8, 1992, after the public opening conducted at 2:00 p.m. on the same day. Bids were tabulated on April 9, 1992. Bid tabulations were posted on April 13, 1992, and the successful bid was announced. The successful bid was for $8,174.00. Three bids were lower than the successful bid. Choice's bid was for $7,742.56. The other two lower bids were for $8,020.00 and $6,620.00. All three lower bids were rejected as non- responsive. Choice's bid was rejected because it did not meet bid specifications for 22 gauge steel, thermostatically controlled door heaters, and reinforced steel door panels. CHD filed a Notice of Protest on April 14, 1992, and a Formal Written Protest on April 24, 1992. CHD's protest alleges that: Choice's bid was lower than that of the successful bidder; the successful bid was not timely made; the bids were not opened publicly in violation of bidding procedure requirements; and the bid specifications were arbitrary and capricious, favored one bidder, and that Choice's bid was responsive. Neither a notice of protest nor a formal written protest was submitted by Choice or Nor-Lake. Neither Choice nor Nor-Lake attended the informal protest conference conducted on April 30, 1992. On May 7, 1992, Respondent's Office of General Counsel issued its written notice of proposed agency action. The written notice recommended that the bid be awarded to the successful bidder and that CHD's protest be dismissed for lack of standing. CHD requested a formal hearing on May 14, 1992, and the matter was referred to the Division of Administrative Hearings for assignment of a hearing officer on May 15, 1992. The bid submitted by Choice was prepared by CHD but signed by the president of Choice. Neither Nor-Lake nor CHD signed a bid or were otherwise bidders of record for bid number SB 92-244I. Neither Choice, CHD, nor Nor-Lake, filed a notice of protest concerning the bid specifications within 72 hours after Choice received the notice of the project plans and specifications on March 13, 1992. The sole basis upon which CHD claims it is substantially affected is the adverse economic impact caused to it by the proposed agency action. The proposed agency action will result in lost sales from this and future transactions. CHD will lose commissions from this and future transactions. The dealer relationship between CHD and Choice will be damaged because Choice will not want to sell a freezer that is not acceptable to Respondent. The marketing strategy developed between CHD and Nor-Lake will be damaged because it is conditioned upon the award of public contracts.

Florida Laws (1) 120.53
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer