LUCILE F. KEELY vs. HARRIET STOKES AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 78-002224 (1978)
Division of Administrative Hearings, Florida Number: 78-002224 Latest Update: Jun. 09, 1980

Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, the arguments of counsel and the entire record compiled herein, the following relevant facts are found. Harriet Stokes purchased the Largo Motel during August of 1967. The motel consisted of six (6) units with a boat basin and dock which adjoined the site. When the property was purchased, the boat basin was navigable from the motel to the open waters of Tarpon Bay. Tarpon Bay is a Class III water body. A representative number of Ms. Stokes' residents and patrons bring in trailered boats ranging in size, approximately fourteen (14) to eighteen (18) feet. Since approximately 1974, silting has occurred in the basin in the immediate area approaching the dock area. The silting has rendered the dock virtually unnavigable except in cases where boat owners are able to access the open waters by poling". Evidence reveals that a number of boat owners have broken their propellers attempting to gain access to the open waters of Tarpon Bay. Based thereon, residents are cautioned against attempting to launch boats from the dock area, which has resulted in a decline of Respondent's fish and pleasure boating guests (Testimony of Harriet Stokes). Johnny DeBrule, the Heavy Construction Superintendent for the Upper Keys Marine Construction Company, Key Largo, Florida, was consulted by Respondent Stokes for completion of the dredging work called for in the subject application. Mr. DeBrule gave his opinion that the subject project could be excavated with a backhoe equipped with a material handling bucket with minimal interruption to the adjacent waters. Richard Dumas, an Environmental Specialist employed by the Department since approximately November, 1977, conducted the initial field site inspection which resulted in the Department's first report recommending issuance of the permit application (Respondent's Exhibit 1). Mr. Dumas testified that he failed to consider the proper standards when he initially issued his first site inspection report which recommended approval of the project as applied for. Dumas was part of the inspection team which included Messrs. Michael Nowicki, Curtis Kruer, and Attorney Ray Allen. After the second field inspection survey was made during December, 1979, the team unanimously concurred that the project as applied for did not entail maintenance dredging and, further, that based upon an in-depth inspection during the second visit, the project, as applied for, was not permittable. Mr. Dumas's earlier recommendation which favored the approval of the subject project was prompted in large part by the policy consideration of the economic viability of Mrs. Stokes' motel enterprise. Michael Nowicki (Nowicki), a Dredge and Fill Supervisor employed by the Department in its Punta Gorda office, is in charge of processing short form dredge and fill applications. As part of his employment duties, Nowicki makes recommendations to the District Manager on short form applications and as part of this review process has reviewed and appraised approximately three thousand (3,000) dredge and fill applications. Nowicki was involved with the formulation and review process of the subject application. During the inspection on this project on December 10, 1979, the dredging was determined not to be "maintenance dredging" since the dredging "would occur in an area of exposed caprock bottoms situated approximately six (6) to nine (9) inches below the surface waters and would result in the destruction and elimination of the thriving benthic community" (Testimony of Kruer, Nowicki and Dumas). In this regard, during May of 1979, Dumas conducted water samplings in the immediate areas of the proposed project and noted that there was a very diverse and productive benthic algal community which was surviving on the nursery and feeding grounds supplied by the grass flats and natural shorelines (Testimony of Dumas and DER Exhibits 10 and 11). Subsequent inspections by Curtis Kruer corroborate this fact. Curtis Kruer, an Environmental Specialist received as a marine biology expert in this proceeding, performed an on-site inspection of the proposed project on December 6, 1979. Kruer made several probings in the area and found that natural caprock was present in the very shallow areas of the bay bottoms. He found that approximately 70 percent of the area was very diverse and highly vegetated. For example he found that the bay bottom is composed of approximately 30 percent benthic algae, 30 percent silt and organic detritus, and approximately 40 percent sea grasses. The most abundant seagrasses were turtle grass with a small amount of Cuban shoalgrass near the boat ramp. Kruer noted that the vegetated bottoms serve as nursery grounds for the area's marine community which consisted of several varieties of juvenile commercial and recreational fish and shellfish (DER Exhibit 11). Kruer noted that adjoining dredged areas immediately adjoining the proposed project have not revegetated and that there are thick layers of silt and organic materials on this site. He further noted that the project would conflict with the natural shoreline and that there were reasonable alternatives which would provide favorable and less destructive uses for the Petitioner's boat basin. Among the alternatives suggested by Kruer was a boat dock with piers supported by pilings of adequate depth in the project's bay bottoms (DER Exhibit 11). Finally, Kruer noted that the proposed dredged area contains productive vegetated benthic communities which will only revegetate, if at all, over extended periods of time (DER Exhibit II).

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department enter its final order denying the application for a permit to dredge approximately 5,400 square feet of silt from the boat basin at Largo Lodge, Key Largo, Monroe County, Florida. RECOMMENDED this 22nd day of April, 1980, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: Ms. Lucile Keely 5797 La Luneta Avenue Miami Florida 33155 Michael Egan, Esquire ROBERTS & EGAN, P.A. Post Office 1386 Tallahassee, Florida 32301 H. Ray Allen, Esquire William W. Deane, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Jacob R. Varn, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57120.60253.12403.812
# 1
TED WIESE AND SHIRLEY WIESE vs. DEPARTMENT OF NATURAL RESOURCES, 83-001177 (1983)
Division of Administrative Hearings, Florida Number: 83-001177 Latest Update: Aug. 22, 1983

The Issue The issue in this case is whether a beach house petitioners plan to build in south Walton County was already under construction, within the meaning of Section 161.053(7), Florida Statutes (1981) and Rule 16B-33.04(1), Florida Administrative Code, at the time the current coastal construction control line took effect there.

Findings Of Fact In October of 1982, the petitioners acquired a lot in south Walton County, on the north shore of the Gulf of Mexico. Even before the purchase, Mr. Wiese had been in touch with respondent's personnel, who apprised him of the imminence of the adoption of the new (now current) coastal construction control line, at that time already proposed for Walton County. The former coastal construction control line was considerably seaward of the current line, which became effective on December 29, 1982. Petitioners, who have built some seven houses, drew plans for a house to be built on their Walton County lot one foot landward of the old coastal construction control line. They applied for and obtained the necessary county building permit. They contracted for grading on site, which took place on November 27, 1982. In the course of this work, the landward face of the sand dune was disturbed and petitioners realized that, if they were to build so close to the water, a wall or something like a wall would have to be erected and buttressed to keep the sand dune from migrating under or into their beach house. They determined that the plans were inadequate as drawn. Mr. Wiese nevertheless arranged for one Al Christopher to bring two poles to the site and place one of them upright in the sand. When asked at hearing how long the two poles Mr. Christopher delivered to the site were, Mr. Wiese said he did not know. After Mr. Christopher began, petitioners did not ask him to desist either with bringing pilings to the site or with placing them in the ground. Mr. Christopher evidently did what he was asked to do, before he ever began working with the poles. Before the single pile was placed, batter boards were used to locate the perimeters planned for the building. Batter boards are temporary markers which are removed once the foundation is in place. In constructing piling foundations for beach houses along the gulf coast, in this part of Florida if not elsewhere, the ordinary sequence is to bring all foundation piles to the site before bringing the equipment necessary to install all the piles at once. This makes for efficient use of expensive machinery, and is virtually always done. One of the Wieses' neighbors, fearing that the new coastal construction control line would take effect last fall arranged for a single pile to be driven, but his project was well underway by the time the new coastal construction control line did in fact take effect. As late as March of this year, Mr. Wiese checked with a Texas supplier to see if foundation piles would be available for the project. The plans drawn before the grading of November 27, 1982, called for a foundation of 37 piles, each of which was to be 45 feet long. No horizontal members nor bracing of any kind was contemplated for the foundation. The foundation piles were to be put so close together that it would have been impractical to bring heavy equipment in to do the grading after they were in place. The idea in leveling the ground was to prepare it so a concrete slab could be poured to serve as a parking surface underneath the beach house. Under both the plans originally drawn and the plans under which petitioners now hope to proceed the parking surface itself is not expected to have a structural function, Mr. Wiese's testimony to the contrary notwithstanding. Once petitioners were persuaded that the project needed "reengineering," they diligently sought out expert assistance and new foundation plans were eventually drawn to their satisfaction. Petitioners' efforts took place on a regular, if not a daily basis, but consisted in large part of finding the right people for the "reengineering" job. The plans which petitioners propose to use were stamped with the final engineer's seal on March 3, 1983, more than two months after the current coastal construction control line took effect.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That respondent deny petitioners' beach house project grandfathered status, and apply the coastal construction control line adopted for Walton County on December 29, 1982, in any agency action regarding the project. DONE and ENTERED this 22nd day of August, 1983, Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 ApA1Achee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of August 1983. COPIES FURNISHED: Joseph C. Jacobs, Esquire John C. Pelham, Esquire and Melissa Fletcher Allaman, Esquire ERVIN, VARN, ODOM & KITCHEN Post Office Box 1770 Tallahassee, Florida 32322-1170 Deborah A. Getzoff, Esquire Suite 1003 Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32303 Elton Gissendanner, Director Executive Suite 3900 Commonwealth Building Tallahassee, Florida 32303

Florida Laws (2) 120.56161.053
# 2
# 3
COLONEL AND MRS. G. A. P. HAYNES, ET AL. vs. WILLIAM A. ROBERTS AND DEPARTMENT OF NATURAL RESOURCES, 81-001791 (1981)
Division of Administrative Hearings, Florida Number: 81-001791 Latest Update: May 25, 1982

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: By application dated March 9, 1981, and received by the DNR's Bureau of Beaches and Shores on March 13, 1981, respondent sought a permit to construct five single-family dwellings on five 64-foot-wide parcels of land located seaward of the established coastal construction control line (CCCL) on Grayton Beach. Attached to the application were site plans, an affidavit of ownership and a warranty deed showing respondent Roberts to be the owner of the subject property. (DNR Exhibit 1) Question number 5 on the permit application required the "specific reasons the applicant feels that the permit should be approved and why construction seaward of the control line . . . is considered necessary for reasonable use of the property." The answer provided by the applicant to this question was "the landward property line is located 150 feet seaward of the control line. Therefore, no upland property is available on the site for development." (DNR Exhibit 1) By form letter dated March 16, 1981, DNR notified respondent Roberts that his application for a permit was incomplete and that two further items of information were necessary before his application could be considered. One item was written evidence that the proposed project would not contravene local setback requirements or zoning or building codes. The other item was detailed site, grading, drainage and structural plans and specifications for the proposed structure. These plans were to be certified by a registered Florida engineer or architect. (DNR Exhibit 2) On or about March 31, 1981, the DNR received the certified architectural plans from the project architect, who is registered in the State of Florida. These plans, as well as the site plans submitted by the engineer, contained the signature and seal of the architect and the engineer. They each intended their signature and seal to constitute a certification that, in their opinion, the drawings or plans were in compliance with all statutes, rules, local ordinances and/or other regulations which govern the project. A certification of documents by the placement of signature and seal of an engineer or architect is the commonly accepted practice and usage in those professions. It is not the policy of DNR to require an itemized certification reciting every requirement of the DNR rules. By form letter dated April 6, 1981, the DNR notified the applicant that written evidence of compliance with local government regulations was still lacking. (DNR Exhibit 4) On April 13, 1981, DNR received a letter dated April 9, 1981 from the Walton County Attorney advising that "The Board of County Commissioners of Walton County has no local setback requirements or zoning or building requirements which would prohibit the proposed activity as submitted to the Bureau." (DNR Exhibit 5) This letter satisfied the requirement of Rule 16B-33.08(1)(c), Florida Administrative Code, that the proposed project would not contravene local setback requirements or zoning or building codes. Full scale copies of topographic and site plans were received by the Bureau of Beaches and Shores on April 15, 1981. The application for a permit was deemed complete as of April 15, 1981, (DNR Exhibit 7), and respondent Roberts' agent was notified by letter dated June 23, 1981 that the DNR Executive Director had recommended to the Governor and Cabinet (the agency head of the DNR) approval of the application. (DNR Exhibit 10) The completed application reflects that the five single-family dwellings are to be supported by treated timber pilings with an underside minimum elevation of +14 feet (NGVD). The Federal Base Flooding Elevation for Grayton Beach is +9 feet (NGVD). The architect has certified that the proposed dwelling units are designed to withstand 140 mile per hour winds. The seaward- most dwelling of the five is a maximum of 263 feet seaward of the coastal construction control line, and the applicant's entire parcel of land is located over 150 feet seaward of the control line. The project is located approximately 230 feet from the mean high water line. The project also includes the construction of a private road, septic tanks and drainfields. The dune system in front of the proposed structure will offer substantial protection to the structure against storm and wave action. The excavation proposed includes that necessary for the placement of the pilings, the septic tanks and the drainfields, and the construction of the proposed driveway. The proposed drainfields will extend partially above existing grade and fill material i11 be placed over them. The driveway consists of a 16-foot asphalt paved road located landward of the proposed dwellings. The dunes will be reduced in height where the driveway is to be constructed. It is not clear from the testimony or the documentary evidence adduced at the hearing where the parking of vehicles belonging to residents or guests of the five units is to occur. While there was testimony from Mr. Truitt to the effect that no net loss of sand will occur and that the project will involve more of a balancing of grade as opposed to excavation, the engineering plans submitted with the application illustrate at least nine rather large areas of cut and fill associated with the driveway, septic tanks and drainfields. The project engineer had considered no studies on the topography or littoral trends of this specific site, had no knowledge of engineering data regarding adjacent properties and had not reviewed any data regarding major storms on the subject project site. The engineering plans submitted as a part of the application contain a diagram illustrating five separate 750 gallon septic tank systems, one for each dwelling unit, with the "drainfield [for each unit] to be constructed in accordance with Chapter 10D-6, F.A.C." (DNR Exhibit 1) The larger scale engineer's drawing submitted to DNR on April 15, 1981, gives more specific information regarding the location and depth of the below grade drainfields on the seaward side of the structures. A DNR interoffice memorandum dated June 1, 1981, reflects that the applicant's agent agreed in a telephone conversation that, "if possible, he would move the septic tank (750 gal) and related drainfields to the landward side of the buildings." (Joint Exhibit 1) The Cabinet agenda item dated later in time, however, notes that the "septic tanks (750 gallon) and drainfields will extend an additional 50 feet seaward of each dwelling." (DNR Exhibit 8) The exact proposed location of the septic tanks and drainfields was not clarified at the final hearing, nor was sufficient evidence adduced concerning the justification for the proposed discharge system. Evidence concerning the availability of any existing alternatives to the system proposed by the applicant was not adduced, nor was evidence presented concerning storm water discharge. As of the time of the hearing in this matter, the applicant had no plans for heating or cooling the five dwelling units. When asked at the hearing what "justification" the Bureau of Beaches and Shores received for the proposed waste water discharge system, Mr. Clifford Truitt, the Bureau's chief engineer and the person responsible for review of this application, replied in two ways. First, he stated that the fact that the property was located entirely seaward of the CCCL was justification for the discharge system. However, he admitted that a "dry sanitary system" would be a better alternative. Later, Mr. Truitt stated that "justification" for the domestic waste system is only required when there is a beach level discharge. Mr. Truitt was accepted as an expert witness in the area of coastal engineering. His opinions regarding the proposed project were based upon his review of aerial photography of the Grayton Beach area and comparison of topographic profiles of the area, his review of the engineering and topographic information submitted with the application itself and his familiarity with the project location. No evidence was adduced that engineering data concerning storm tides related to shoreline topography was considered by Mr. Truitt or anyone else. No specific studies exist regarding the stability, littoral trends or the erosional history of the proposed site and surrounding area. The project site has been the subject of other permit applications considered by the DNR, and Mr. Truitt was of the opinion that a mitigating feature of the present application was that "the present proposal has the lowest density and least extension seaward of the control line of any proposal to date." (DNR Exhibit 8) It was Mr. Truitt's opinion that the dwelling unit structures were adequately elevated and designed to adequately resist the natural forces associated with a 100-year return interval storm event and would not increase the threat of damage or danger to nearby structures. Factual evidence concerning the 100-year storm event was not presented at the hearing. Mr. Truitt further opined, without the aid of engineering data or the studies mentioned above, that the proposed construction would not affect the natural shoreline fluctuations or the stability of the dunes in the area. Such an opinion contains no factual basis in the record of this proceeding, and thus is not sufficient evidence upon which to make a similar finding of fact. On various sporadic occasions, a waterway or pass connecting Western Lake to the Gulf of Mexico runs in a westerly direction in the vicinity of the applicant's property. At times, this watercourse has been wide and deep enough to allow swimming, diving and the passage of small boats. The witnesses who testified about this watercourse were not qualified as surveyors or experts in estimating or calculating the exact location of that watercourse relative to the proposed site, and there was no testimony that such an event had occurred within the past twenty years. At least two witnesses testified that the last time they could recall the watercourse or pass traversing or abutting the applicant's property was in the late 1950s. The proposed project site has been covered with storm waters on at least two occasions in the past seven years. No evidence was adduced at the hearing concerning the substantial interests in this permit application of named petitioners Colonel G. A. P. Haynes, Mr. and Mrs. Roy Cawthon, Mrs. Kate Florence, Mrs. Burton Murray, Colonel and Mrs. Lee Fry, Mrs. Laney Ellis and Mrs. Randall Jones. Mrs. G. A. P. Haynes, one of the petitioners in this proceeding, owns and resides on property immediately adjacent to the project site, and presently entertains an unbroken view of the beachfront. She is concerned with potential sewage problems and damage to her residence from flying debris caused by wind or storm should the proposed construction be approved. Mrs. Haynes was also concerned about the potential adverse effect of the proposed construction on the value of her adjacent property. Petitioner Burton Murray lives to the north of the project site, at least several hundred feet away. His prime concern was that no structure could survive at that location and that the project would therefore be a waste of money. Petitioner Elizabeth Hayes Jones (named as Ms. Lisbeth Haas in the petition) lives across the street and to the east of the project site. Her residence was completely destroyed by hurricane and has since been rebuilt at the same site. She feels that the applicant's project site is not safe for construction, and fears storm damage to her home from the buildings if constructed.

Recommendation Based upon the findings of fact and conclusions of law recited herein it is RECOMMENDED that the application for a coastal construction control line permit to construct five single-family dwellings on Grayton Beach be DENIED. Respectfully submitted and entered this 25th day of May, 1982. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of May, 1982. COPIES FURNISHED: Jerry W. Gerde, Esquire Davenport, Johnston, Harris, Gerde & Harrison, P. A. 406 Magnolia Avenue Panama City, Florida 32401 W. Paul Thompson, Esquire Thompson and Adkinson P. O. Drawer 608 DeFuniak Springs, Florida 32433 Deborah A. Getzoff, Esquire Department of Natural Resources 3900 Commonwealth Boulevard Douglas Building, Suite 1003 Tallahassee, Florida 32303 Dr. Elton J. Gissendanner Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303

Florida Laws (3) 120.57161.052161.053
# 4
PINELLAS COUNTY CONSTRUCTION LICENSING BOARD vs WALTER P. TUGLUS, 96-001683 (1996)
Division of Administrative Hearings, Florida Filed:Largo, Florida Apr. 03, 1996 Number: 96-001683 Latest Update: Nov. 27, 1996

The Issue The issue is whether Respondent, in the practice of marine contracting, committed fraud and other misconduct, in violation of Chapter 75-489, Laws of Florida, as amended.

Findings Of Fact Respondent is certified by Pinellas County as a building contractor and marine specialty contractor. He holds license C-4002, as a certified marine specialty contractor, and license C-1806, as a certified building contractor. Respondent serves as the qualifying agent for Tug Marine Corporation, d/b/a Tug Building and Marine Construction Company (Tug Marine). Through Tug Marine, Respondent undertook to perform the work described below under his marine specialty license. A person holding only a building contractor license could not lawfully have performed this work. Kelly and Karlyn Bradshaw wanted to replace a dilapidated dock at their home. A friend suggested that they contact Tug Marine. Mrs. Bradshaw's telephone call to Tug Marine resulted in a visit to her home on November 7, 1995, by Jay Bowers, an employee of Tug Marine. Mr. Bowers spoke with Mr. and Mrs. Bradshaw and prepared a contract for the work. The contract calls for the removal of the existing dock and installation of a new dock pursuant to a drawing and specifications that are on the contract form. The total cost is $4500, with one-third down and the balance due on completion. The contract is silent as to when work is to start or finish. During negotiations, Mr. Bowers assured the Bradshaws that Tug Marine would finish the new dock by Christmas. He said that the work would take only three days and they would start the work within 30 days. The parties agreed that the Bradshaws would obtain the necessary permits from the City of St. Petersburg. After they did so, Mrs. Bradshaw and Mr. Bowers, on behalf of Tug Marine, signed the contract on November 13, 1995. When she signed the contract, Mrs. Bradshaw gave Mr. Bowers a check in the amount of $1500 payable to Respondent personally. Respondent endorsed the check personally, and the Bradshaws' bank paid the check, debiting the Bradshaws' account by $1500. No one ever performed the work specified in the November 7 contract. Mrs. Bradshaw became concerned when the work did not commence when Mr. Bowers had promised. She first called Tug Marine on December 5. After calling a number of times, Mrs. Bradshaw received a call back on December 10 from Respondent. She expressed her concern to Respondent, who blamed the delays on bad weather. Mrs. Bradshaw asked him when work would start. Respondent said he did not know. She asked him if they had pulled the necessary additional permits. Respondent said that he did not know. When the work still did not commence by Christmas, Mrs. Bradshaw called Respondent and demanded her money back. She made at least five such demands prior to filing a complaint with Petitioner in early 1996. Respondent refused to return the money to Mrs. Bradshaw. He explained that the company was financially distressed and did not have the money to return to her. Respondent committed fraud in the business of contracting when he cashed the Bradshaws' check, failed to do the work, and refused to refund the deposit. When he wanted to find a contractor to build a new dock, Joseph Zaia checked the yellow pages for the name of a contractor and found Tug Marine. He called the number listed and set up an appointment. At the appointed time, Mr. Bowers, still an employee of Tug Marine, visited Mr. Zaia's house on September 8, 1995. After discussions, Mr. Bowers prepared a contract dated September 8 calling for the installation of a 44-foot long dock at a total cost of $4000 or possibly $3342. (The bottom of the contract states $4000, and the middle of the contract shows $4000 lined out and $3342 written in.) The Zaia contract is on the same form as the Bradshaw contract. The contract is silent as to when work is to start or finish. During negotiations, Mr. Bowers assured Mr. Zaia that the work would be completed in two weeks. On September 12, 1995, Mr. Zaia and Mr. Bowers, on behalf of Tug Marine, signed the contract. At that time, Mr. Zaia gave Mr. Bowers a check in the amount of $1114 and payable to Respondent personally. Respondent personally endorsed the check. Mr. Zaia's bank paid the check and debited Mr. Zaia's account by $1114. Shortly after the contract was signed, Respondent contacted Mr. Zaia and informed him that local authorities would permit a dock only as long as 35 feet. Mr. Zaia told him to prepare a new drawing and new cost estimate. Respondent never contacted Mr. Zaia again. No one at Tug Marine ever gave Mr. Zaia the new information that he had requested or returned his deposit. In late October 1995, Mr. Zaia filed a complaint with Petitioner. Respondent committed fraud and mismanagement or misconduct in the practice of contracting by taking Mr. Zaia's deposit and refusing either to return it or do the work.

Recommendation It is RECOMMENDED that the Pinellas County Construction Licensing Board enter a final order revoking Respondent's marine specialty contractor certificate, license C-4002 and suspending Respondent's building contractor certificate, license C-1806, for a period of ten years; provided the suspension of the contractor certificate shall be lifted at anytime after one year if Respondent reimburses Mr. and Mrs. Bradshaw and Mr. Zaia for the deposits that they paid him. ENTERED on September 30, 1996, in Tallahassee, Florida. ROBERT E. MEALE, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this September 30, 1996. COPIES FURNISHED: William J. Owens, Executive Director Pinellas County Construction Licensing Board 11701 Belcher Road, Suite 102 Largo, Florida 34643-5116 Thomas C. Little, Esquire Post Office Box 5379 Clearwater, Florida 34625

Florida Laws (3) 120.57455.227501.204
# 5
BARBARA ANN BUTLER vs. HARRY B. WILLIAMS AND DEPARTMENT OF NATURAL RESOURCES, 88-005439 (1988)
Division of Administrative Hearings, Florida Number: 88-005439 Latest Update: Apr. 27, 1989

Findings Of Fact On February 10, 1988 Harry B. Williams made application to the Department of Natural Resources for permission to construct a single-family dwelling with appurtenant structures at 2831 Ponte Verda Boulevard South, South Ponte Verda Beach, Florida. The permit sought was a coastal construction control line permit which would allow construction seaward of that line in the direction of the Atlantic Ocean. A copy of that permit application may be found as Department's Exhibit Number 2. Associated with the permit application was a description of the plans related to the dwelling and other structures. This application was received by the Department February 11, 1988. Following a review of the permit application the Department deemed it complete as of February 22, 1988. A site inspection was made of the property and a report was prepared by an employee with the Department, a Mr. Partel. The report may be found as Department's Exhibit Number 4, which includes photographs of the prospective building site, together with the surrounding property to include dwellings to the north and south of the lot where the Williams home would be built. As commented on by Mr. Partel the applicant had intended at that time to construct a single-family dwelling a maximum of 75 feet seaward of the coastal construction control line. Although this evaluator, Mr. Partel, felt that the applicant had requested the right to construct a dwelling which was in line with existing construction, he felt that it could be moved further landward and that it could be limited in deck size and that a cantilevened form of construction was preferable to the concrete called for in the plans set out in the application information. It was also suggested that the sea oats that were in the way of the construction should be relocated seaward on a dune face slope where a denuded area is found. In this connection, the Department is empowered to make suggestions to the applicant concerning the minimization of the adverse impacts on the beach-dune system. Following the site visit of February 26, 1988 the Department wrote the applicant on March 11, 1988 and indicated concerns about the proximity of the dwelling to the crest of the dune. A copy of this correspondence may be found as Department's Exhibit Number 5. In the correspondence the Department asked the applicant to move the proposed dwelling 10 feet landward and that the 10 foot wide concrete patio, on the seaward side, be modified to a 10 foot wide wooden deck. The letter told the applicant that the approval would be conditioned on the sea oats and other dune grasses that would be disturbed by the proposed structures being replanted seaward of the project in the denuded areas of the dune. The applicant agreed to these changes. The relocation of the structure 10 feet landward took it away from the beach- dune system. The modified site plan that was brought about by the suggested changes is found Department's Exhibit Number 6, a copy of that amended site plan. With the relocation the construction would be 66 feet seaward of the coastal construction control line. An aerial photograph of the site location reference the basic design of the dwelling and the proximity to the relevant or existing coastal construction control line is found as Department's Exhibit Number 3. In responding to the suggestions to the change in location the modified site plan which moved the dwelling 10 feet landward was received by the Department on August 1, 1988. Under this arrangement the applicant had agreed to waive the requirements of Section 120.60, Florida Statutes pertaining to the obligation by the Department to review and decide its action of grant or denial within 90 days of date of receipt of the application. With the changes being made to the location of the proposed dwelling and associated structures and the type of construction materials used in the patio on the seaward side, together with the relocation of the plant life, the impact on the beach-dune system and adjacent property is acceptable. There is no adverse impact on the beach-dune system or on the adjacent properties. The location of the proposed dwelling and its associated structures as it relates to the 30-year erosion projection under the terms of Section 161.053, Florida Statutes, in this instance, shows that the dwelling would be approximately 55 feet landward of the 30-year erosion projection and not at risk. Calculations related to this finding may be found within Department's Exhibit Number 7. The existing coastal construction control line dates from January 28, 1988. Although the original application referred to the previous line of 1978 in describing the site plan and survey, the reason for this was that the site plan and survey were prepared prior to the establishment of the January 28, 1988 line, as allowed. In the course of the hearing appropriate reference was made to the January 28, 1988 line as it relates to the anticipated location of the dwelling and other structures as modified at the instigation of the Department. As contemplated by Section 161.053(5)(f), the Department required the applicant to provide mitigation of the- effects of the construction as a condition to a grant of the permit. Those permit conditions may be found in the Department's Exhibit Number 8, a copy of a proposed final order. Included within those would be the requirements for erection of a temporary construction fence on the site to protect existing native dune vegetation from the impacts of that construction, in addition to the requirement of the dune vegetation relocation. This would involve the irrigation and application of fertilizer to those plants with the expectation that a certain percentage would survive over time as described in this special condition. This project will not pose a hazard to the sea turtle and its hatchlings and habitat for the sea turtles and hatchlings. Ms. Butler, Petitioner in this cause, has a beach home which is north of the Williams property separated by a 10 foot easement between those properties. In mid July, 1988 Ms. Butler offered a written statement in opposition to the placement and size of the proposed dwelling together with other remarks and asked that the Department provide her information and documents pertaining to the application under the authority of Chapter 119, Florida Statutes. On August 10, 1988 the Department dispatched a letter of inquiry to surrounding property owners to include Ms. Butler and solicited remarks concerning the Williams application to be provided on or about August 20, 1988. Ms. Butler had received certain documents from the Department concerning the application sometime in the middle of August 1988. On August 18, 1988 Butler made known her objection to the project on the grounds that the concerns about the 30-year erosion line and the size and placement of the dwelling. On September 2, 1988 the Department informed Ms. Butler of the intent to grant the permit to Mr. Williams. A copy of that correspondence may be found as Petitioner's Exhibit Number 5. This led to a timely request for hearing by Ms. Butler stating her opposition to this project. The request was received in accordance with the Department's advice that the request must be filed by September 26, 1988. Based upon the prehearing conference and the discussion of those issues which would be allowed for consideration as stated in the request for hearing and the statement of particulars that attend the request for hearing, commented on by the hearing officer at the commencement of the final hearing, and found within the transcript and further stated in the issues portion to this Recommended Order, this case has been carried forward. The presentation made by the Petitioner, after the Department and applicant had offered their cases, was through her testimony and that of employees of the Department together with exhibits she offered. The testimony of the Department employees concerned the procedural techniques that the agency pursued in reviewing the application at issue. Ms. Butler described her concern for her property, and the area between her property and the Williams property. This is the 10 foot easement area which is sparsely vegetated and low. As a consequence she was concerned that her property might be destroyed with the advent of the Williams construction. She has no expertise in her own right nor did she present expert opinion from other witnesses which would tend to bear out her concern. She also expressed the concern that the Williams home, in its dimensions, was too large and that it should be relocated an additional 10 feet back from the adjusted placement following the Department's criticism of the original application. In effect, she would have the house placed 20 feet away from the sea as compared to the original site plan submitted with the application on February 10, 1988. Again, there is no competent evidence presented which would support her theory that this further relocation was needed. Her expression of concern for the sea turtles and their hatchlings and habitat was not well founded. Turtles are known to nest on the sandy flat beach area and the construction of the Williams property will not interfere with that area adjacent to the ocean.

Recommendation Based upon a consideration of the facts and the conclusions of law reached, it is RECOMMENDED: That the Department enter a Final Order which grants a coastal construction control line permit to Harry B. Williams, Jr., based upon his modified plan required by the Department and upon the special permit conditions announced in the proposed final order, a copy of which is found as Department's Exhibit Number 8. DONE and ENTERED this 27th day of April, 1989, in Tallahassee, Leon County, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of April, 1989.

Florida Laws (3) 120.57120.60161.053
# 6
GROVE ISLE, LTD. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-002609 (1981)
Division of Administrative Hearings, Florida Number: 81-002609 Latest Update: May 05, 1982

Findings Of Fact The following findings are based on the uncontested facts alleged in Petitioner's Motion For Summary Recommended Order and from the Final Orders issued in Bayshore Homeowners Association v. Department of Environmental Regulation and Grove Isle, Inc., Case Nos. 79-2186, 79-2324 and 79-2354. On December 29, 1980 DER entered a Final Order on the application of Petitioner for a 90 slip marina in Biscayne Bay, Florida. The Order denied the permit because Grove Isle had not demonstrated that the project is "affirmatively in the public interest" and because the applicant had not demonstrated that it "can meet ambient water quality standards within the project area itself." In the Recommended Order on Remand the Hearing Officer had defined "existing ambient waters" to be the area in the cove between Grove Isle and the Miami mainland. The Final Order rejected that concept and held if any waters others than those contained within the immediate project site were to be considered as ambient, Petitioner must request a mixing zone as part of its application. See Section 17-4.242, (1)(a)2.b. and Section 17-4.244, Florida Administrative Code. By a letter received at the Department of Environmental Regulation on May 20, 1981, Grove Isle reapplied for the boat dock permit which was the subject of the foregoing proceedings. Petitioner's application, which was in the form of a letter from counsel, stated: May 18, 1981 Mr. Larry O'Donnell Department of Environmental Regulation Post Office Box 3858 West Palm Beach, Florida 33402 RE: GROVE ISLE - Application for Boat Dock Dear Mr. O'Donnell: On behalf of Grove Isle, LTD, I am reapplying for the boat dock permit previously applied for by Grove Isle, LTD. Please consider this a short-form application. Your office designated a previous file number, DF 13-7956, to this matter. In conjunction with that application I am applying for a mixing zone, pursuant to Rule 17-4.244, for both the construction and operation of this marina. Please refer to your file on the previous application and incorporate said documents into this reapplication. I am submitting with this application: A scale drawing (one inch = 100') of the proposed facility. (which you have) A certified survey of the proposed mixing zone. (one inch = 100') An application fee of $20.00 A copy of the Final Order issued by Jacob D. Varn, former secretary of DER, on the previous application. A copy of the Notice of Intent previously issued for this project, dated 9/23/79. (which you have) As you will note from reading Mr. Varn's Final Order, he concluded that issuance of this permit was not appropriate inasmuch as the applicant had not applied for nor received a designated mixing zone. We do not necessarily agree with this order and have, in fact, appealed this decision to the First District Court of Appeal. However, in an attempt to keep this matter from becoming any more complicated, we have decided to reapply for the permit and to apply for a mixing zone. We do not concede that a mixing zone should be required for this project or that the facility will result in the release of any pollutants so as to significantly degrade ambient water quality. However, should this project, through its construction or operation, result in the release of any pollutants, I believe they would be limited to: Bottom sediments placed in suspension by the installation of the concrete piles used to support the docking facility during construction; Minimal amounts of oil and grease which may escape from the various vessels moored to the docks; The constituants of anti-fouling paint which may be applied to the hulls of the various vessels moored at the docks. Turbidity will be controlled by the use of curtains during construction. If lowered water quality occurs at all in this project it would only occur within the designated mixing zone, as per Rule 17-4.242 (2)(b) F.A.C. Please advise me should additional information be needed to process this re-application. Yours truly, /s/ KENNETH G. OERTEL On June 19, 1981, DER sent a "completeness summary letter" to Petitioner which requested the following information: Your project is in Outstanding Florida Waters. Please provide the following items demonstrating compliance with Section 17-4.242, Florida Administrative Code. Please demonstrate that this project is clearly in the public interest and that this project will not result in the degradation of ambient water quality beyond the 30 day construction period. Petitioner responded by letter dated June 22, 1981 and which was received at DER on June 25, 1981. Petitioner said in pertinent part: Dear Mr. Duke: If you would check your previous file no. DF-13-7956, I believe you will find all the information you have requested has previously been provided to your office either in that permit file or through the administrative hearings held in pursuit of this application. I think it would be more fruitful if you would communicate with Al Clark, Attorney for DER, with regard to the status of this application. As I do not wish to speak on behalf of Mr. Clark, I believe you should confirm the status of this application with him, particularly in view of our attempt to comply with Secretary Varn's Final Order which suggests the application for this mixing zone. The record reflects no further correspondence between the parties until September 23, 1981 when the Department entered a Final Order Denying Application for Permit. The Order provided that: This project was reviewed previously (DF 13-7956) and was determined not to be clearly in the public interest pursuant to Section 17-4.242, F.A.C. No further evidence upon resubmittal, has been provided to clearly demonstrate that this project is in the public interest. Furthermore, the requested mixing zone exceeds that allowable pursuant to Section 17-4.244, F.A.C. and can be applied only during the construction period, pursuant to Section 17-4.242, F.A.C. During the operation of this facility ambient water quality is expected to be degraded in violation of Section 17-4.242, F.A.C. This order was entered ninety-one days after DER received Petitioner's June 22, 1981 letter.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Department of Environmental Regulation issue the permit applied for by Petitioner, Grove Isle, Ltd. on May 20, 1981 subject to the conditions contained in the Notice of Intent To Issue Permit dated October 23, 1979 which is a part of the record in Bayshore Homeowners Association et al., v. State of Florida Department of Environmental Regulation and Grove Isle, Inc., Case Nos. 79-2186, 79-2324 and 79-2354. DONE and RECOMMENDED this 12th day of February, 1982, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1982.

Florida Laws (2) 120.57120.60
# 8
WINGFIELD DEVELOPMENT COMPANY vs. DEPARTMENT OF NATURAL RESOURCES, 89-000008RX (1989)
Division of Administrative Hearings, Florida Number: 89-000008RX Latest Update: Apr. 19, 1989

Findings Of Fact Petitioner, Wingfield Development Company (WDC), is a real estate development company located at 390 North Orange Avenue, Suite 1800, Orlando, Florida. In late 1982 or early 1983, WDC began developing a resort project known as Turtleback Beach Club (the project) in Indian River County. When completed, the project will consist of a 256 unit hotel, 68 villas, two swimming pools, a number of cabanas, a reverse-osmosis water plant, and other amenities which will cost approximately $50 million. All structures were designed to be constructed landward of the then existing coastal construction control line (CCCL). The date of establishment of the original CCCL is not of record. From late 1982 or early 1983 until 1987, WDC expended approximately $1.4 million on the project. Among the expenditures were the preparation of extensive cite and design plans, the installation of off-site utilities, and the fabrication and installation of some two hundred pilings and a number of pile caps. All such work was performed landward of the then existing CCCL. On March 5, 1987 respondent, Department of Natural Resources (DNR), reestablished the CCCL in Indian, River County. The new CCCL was more landward than the original CCCL. This resulted in several portions of the project, including all or parts of the villa and hotel, being seaward of the new CCCL. In November 1987 WDC was advised by the Indian River County Building Department to cease construction activities because, after consultation with DNR, it has decided not to make any further inspections. On April 4, 1988 DNR advised WDC by letter that, after making a site review of the project, it had determined that: the foundations for the hotel structure and the cabana located in the southeast portion of the property were `under construction' pursuant to the definition contained in Subsection 16B-33.002(56), Florida Administrative Code, at the time of the reestablishment of the coastal construction control line on March 4, 1987, ... (and that) the remaining five proposed cabana structures located on the south half of the property and shown to be seaward of the new control line, the proposed swimming pools, decks and gazebos, parking areas also shown to be seaward of the new control line and any other proposed landscaping work were not `under construction' pursuant to the definition. The letter added that the: staff shall consider the exemption status for the hotel and the one cabana under construction void if construction activity on these structures remains idle for a period of six months from the date of receipt of this exemption determination and prior to completion of the structures. Finally, the letter required petitioner to submit: a proposed `build out' schedule (that) would entail providing (the) staff with specifics of where (petitioner) expect(s) the overall project to be at ninety (90) day intervals up through completion of the structures located seaward of the coastal construction line. The staff feels that two years should be more than ample time with which to complete that portion of the project located seaward of the coastal construction control line. Progress must be maintained on each structure during each six month interval. Additionally, should your project fall short of any ninety day progress levels to be referenced in your `build out' plan, your project will lose it's (sic) exemption status and all remaining portions of the project, seaward of the control line will require a permit from the (DNR) in accordance with the provisions of Section 161.053, Florida Statutes. Because the letter offered a point of entry to contest the proposed agency action, WDC requested a section 120.57(1) hearing. At the same time, it continued construction on the project. On November 25, 1988 DNR issued further proposed agency action in the form of a letter advising WDC that, based upon a review of WDC's exemption file, the exempt status of the project had been "lost" and that any further construction activity seaward of the CCCL would require a permit from DNR under section 161.053. The receipt of this advice prompted WDC to file a second request for a section 120.57(1) hearing and a petition seeking to invalidate what it perceived to be an illicit rule, or in the alternative, the two rules from which the statements were drawn. WDC contends that DNR's requirement that, once a project is given an exempt status, it must remain under active construction and the owner must submit for DNR's approval a "build out" schedule, is an illicit rule since such a requirement is not contained in DNR's rules. Under state law, as implemented by DNR, no construction activity may take place seaward of a CCCL without a permit from DNR. However, any projects that are under construction at the time of the establishment of the CCCL are exempt from such permitting requirements. Under the current DNR organizational structure, the Division of Beaches and Shores (Division) is charged with the responsibility of administering and enforcing the CCCL regulatory program. The Division's Bureau of Coastal Engineering and Regulation has been assigned the task of performing a site review of all projects for which local building permits have been issued at the time of the establishment of a CCCL. If a project is under construction, as defined in DNR rules, at the time of the establishment of the CCCL, the owner may continue his activities even if the structures are seaward of the CCCL. A determination as to whether a structure is under construction at the time a CCCL is reset does not take into consideration the impacts the structure will have on the beach and dune system. This is because DNR considers such a determination to be regulatory in nature, and such impacts would be irrevelant to that decision. The Division construes its authority as also permitting it to require an exempt project to remain under active construction once it receives an exempt status. It does so on the notion that this insures that the exemption status was obtained in good faith, and the builder intended to go forward with the construction in a timely manner and as originally conceived. It has been DNR's experience that some property owners have engaged in a minimal construction program to circumvent the regulatory process. To prevent this, DNR has imposed a requirement that, if construction activity ceases for a period of six months or more, the exempt status will be lost. A six month time period was used because DNR realized that short, unforeseeable delays of less than six months were not uncommon. This policy has been uniformly applied, without discretion to agency personnel to do otherwise, on all projects classified as exempt. In addition, DNR has required project owners to submit to DNR staff a so-called "build out" schedule containing a construction schedule at ninety day time intervals with a time certain for completion of the project. This requirement, although infrequently used, has been uniformly imposed, when needed, upon all exempt projects, including that of WDC. The agency concedes that there is no specific statutory language authorizing the above requirements. However, it takes the position that these requirements are authorized and sanctioned by chapter 161 as a whole and by rules 16B-33.002(56) and 16B-004(1), which happen to be the rules challenged by WDC. Those rules read as follows: 16B-33.002 Definitions. (56) "Under construction" is the continuous physical activity of placing the foundation or continuation of construction above the foundation of any structure seaward of the established coastal construction or setback line. Under construction does not include application for or obtaining a building permit, a site plan approval or zoning approval from the appropriate local government agency having jurisdiction over the activity, purchasing construction materials, placing such construction materials on the site, clearing or grading the site in anticipation of construction, site surveying, continuation of site work beyond the limits of the foundation including landscape work or construction of nonhabitable major structures or rigid coastal or shore protection structures, or reactivating construction after substantially all construction activity has remained stopped for a period of six months or more. 16B-33.004 Exemptions from Permit Requirements. (1) Any structures under construction prior to the establishment of a coastal construction control line in a particular county are exempt from the provisions of Section 160.053, Florida Statutes, and this Chapter, except as noted in Subsection 161.053(12), Florida Statutes. Respondent acknowledges that there is nothing in rule 16B-33.004(1) that specifically authorizes it to impose the challenged requirements. However, it relies upon that part of the rule which reads "except as noted in Subsection 161.053(12), Florida Statutes" as implicitly authorizing this action. That statute removes the exempt status of a project if there are any subsequent modifications which "require, involve, ,or include any additions to, or repair or modification of the existing foundation of that structure." According to the Division director, it construes that language as authorizing it to make a determination as to whether the project owner has made any substantial changes in the nature of the project or if construction has been continuous. Respondent also relies upon rule 16B-33.002(56) which defines the term "under construction" as being "the continuous physical activity of placing the foundation or contination of construction above the foundation of any structure seaward of the established coastal construction control or setback line." The Division interprets this language to mean that construction must be continuous and without a cessation of activities of more than six months. This rule language is bottomed on subsection 161.053(9) which reads in pertinent part that "the provisions of this section do not apply to ... structures existing or under construction prior to the establishment of a coastal construction control line as provided herein; provided such structures may not be materially altered except as provided in subsection (5)." Finally, the agency relies upon subsection 161.053(1)(a) which sets forth the legislative intent behind the establishment of CCCLs. Among other things, the purpose of a CCCL is to protect, the beaches and dunes from imprudent construction which can "provide inadequate protection to upland structures." In the words ,of the Division director, DNR interprets this language to mean that it has the authority to "go back and look at projects once they are declared exempt, and to make sure that they remain exempt under the statute." The DNR documents which grant exemptions do not contain any reference to requirements that there be continuous construction on the project and that a build out schedule be submitted thereafter. Even so, DNR contends it is merely granting a "conditional" exemption conditioned on the project owner maintaining active and continuous construction. It posits further that, without such authority, its regulatory program would be rendered ineffective. However, the Division director conceded that, even without the imposition of these requirements, DNR still has authority to regulate all structures which are constructed seaward of the CCCL and to prohibit any material changes to an existing or partially completed structure. Petitioner intends to complete its project, but contends it cannot do so at the pace required in DNR's build out schedule. Also, WDC points out that it is unable to secure permanent financing for the project since lender's are uncertain if DNR will approve the build out schedule and allow construction to go forward or instead precipitously halt the construction. There have been no construction activities on the project since November 1988.

Florida Laws (8) 120.52120.54120.56120.57161.041161.052161.053161.131
# 9
THOMAS R. SWEENEY vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 97-003116 (1997)
Division of Administrative Hearings, Florida Filed:Daytona Beach, Florida Jul. 09, 1997 Number: 97-003116 Latest Update: Oct. 21, 1998

The Issue The issue is whether Petitioner's after-the-fact modification application for construction activities seaward of the coastal construction control line in New Smyrna Beach, Florida, should be approved.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: In 1984, Petitioner, Thomas R. Sweeney, purchased a home at 5917 South Atlantic Drive, New Smyrna Beach, Florida. At that time, the home was approximately 3,000 square feet in size. The home sits seaward of the coastal construction control line (CCCL) and thus any construction activities on the premises require the issuance of a CCCL permit from Respondent, Department of Environmental Protection (DEP). In 1987, Petitioner constructed a first floor porch, second story addition, and wooden deck at the site without first applying for and obtaining a CCCL permit from the Department of Natural Resources, which was subsequently merged with DEP. After the construction was completed, Petitioner submitted an after-the-fact application for a CCCL permit for those structures. Before being issued Permit Number VO-423, Petitioner was required to pay an administrative fine. Among other things, Permit VO-423 approved an already constructed wooden deck on the eastern side of the home which approximated 840 square feet in size. Petitioner was also given approval for a wooden walkway with stairs that provided access to the beach. On June 1, 1995, Petitioner filed a second CCCL application with DEP to add a 20-foot first and second story addition with a deck to the south side of the home. After reviewing the application, on November 9, 1995, DEP issued CCCL Permit Number VO-627 authorizing the scope of work identified in the permit application documents. Notwithstanding the limited amount of work authorized by the permit, Petitioner constructed a third story addition to his home. He also removed the original wooden deck on the eastern side of the home, and he constructed spread footers and a foundation on top of the rock revetment for a new and much larger deck. The new deck is approximately 2,100 square feet, or more than 1,200 square feet larger than the original permitted deck. In its present state, the home is approximately 5,600 square feet, and the existing eastern deck is larger than any permitted deck on any other single-family home in Volusia County. On September 9, 1996, DEP discovered the third story addition and the much larger wooden deck with appurtenant structures. Presumedly at the behest of DEP, on November 22, 1996, Petitioner submitted an application for an after-the-fact modification of CCCL Permit Number VO-627 to authorize the previously completed, unauthorized work. On April 23, 1997, DEP issued CCCL Permit Number VO-627 After-the-Fact. The permit approved the third-story addition to the home together with a 10-foot wide wooden deck on the seaward side of the entire third story and a 12-foot wide wooden deck on the landward side of the third story. DEP denied, however, authorization for Petitioner's new wooden deck on the first floor with a tiki hut and sundeck on the ground those structures violated Rule 62B-33.005(4)(e), Florida Administrative Code. That rule requires that any new construction seaward of the CCCL "minimize the potential for wind and waterborne missiles during a storm." The issuance of the proposed agency action prompted Petitioner to initiate this proceeding. On November 3, 1997, DEP entered a Final Order directing Petitioner to pay a fine because he illegally constructed structures seaward of the CCCL. The order was never appealed, and thus the time to challenge the order has elapsed. As of the date of hearing, Petitioner had not paid the fine, and a statutory lien has been placed on the property. The Storm Surge Elevation at this site for a 100-year storm event is 10.7 feet N.G.V.D. The Breaking Wave Crest- Elevation for a 100-year storm event at this site is 14.9 feet N.G.V.D. Part of the new eastern deck is located below an elevation of 14.9 feet N.G.V.D. The builder who constructed the additions, Edward Robinson, characterized them as "above average to superior" in quality. To minimize the possibility of the deck washing away during a storm event, he used the "best" nails, bolts, and concrete available. In addition, the new decking was rested upon concrete footers for support. The footers, however, are on top of a rock revetment, and Robinson conceded that such footers are not as stable as a pile foundation. Petitioner used coquina rock (with a low unit weight) for his revetment. It was established that the rocks on which the footers rest are not permanent, and they can shift during a large storm event. In fact, shifting can occur even during a ten-year storm, and there will be a total failure of the revetment during a thirty-year storm event. Once the stones move, an erosion process begins, and the deck will fail. The accompanying high winds will then lift the wooden debris in an airborne fashion. Depending on the strength of the storm, the airborne debris will be a threat not only to Petitioner, but also to his neighbors. Therefore, it is found that the existing construction for the eastern deck does not minimize the potential for wind and waterborne missiles during a storm, and it thus violates Rule 62B-33.005(4)(e), Florida Administrative Code, as alleged in the proposed agency action denying in part the permit.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a Final Order denying Petitioner's application for an after-the-fact amended CCCL permit to construct an expanded eastern deck with a tiki hut and sun deck on his property at 5917 South Atlantic Avenue, New Smyrna Beach, Florida, and approving the application for the structures previously authorized by the Department in its Final Order issued on April 24, 1997. DONE AND ENTERED this 11th day of May, 1998, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 1998. COPIES FURNISHED: Kathy Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Thomas H. Dale, Esquire Post Office Box 14 Orlando, Florida 32802 Thomas I. Mayton, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 F. Perry Odom, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (3) 120.569120.57161.053 Florida Administrative Code (1) 62B-33.005