CONSTRUCTION INDUSTRY LICENSING BOARD vs. W. BERT JONES, 76-002111 (1976)
Division of Administrative Hearings, Florida Number: 76-002111 Latest Update: Jun. 03, 1977

The Issue Whether the certified general contractor's license of W. Bert Jones should be revoked.

Findings Of Fact By an Administrative Complaint filed October 27, 1976, the Florida Construction Industry Licensing Board sought to revoke the general contractor's license of W. Bert Jones alleging that the Respondent contractor entered into a contract with Mrs. Barbara Loewe to renovate her home and to add a room onto the back of the house; that the Respondent contractor was paid in full the contract price but the job was not completed and there were numerous building code violations. Respondent requested an administrative hearing. Pursuant to written agreements entered into between the Respondent and Mrs. Barbara Loewe of Tampa, Florida, Respondent agreed to renovate Mrs. Loewe's home and to add a room onto the back of the house. Mrs. Loewe, either by paying the Respondent directly or paying material suppliers, paid the full contract price. In June or July of 1975 the Respondent left the job contracted for partially or wholly incompleted as follows: the ceiling of the kitchen and drywall were in complete and the kitchen was not painted; the guest bathroom was not trimmed; two back rooms were incomplete. Inasmuch as the ceiling was left undone, it was not trimmed, the drywall was incomplete, the doorways were left uninstalled, and the paneling was incomplete; the bathroom had no toilet, no sink and no trim on the tub; in the master bedroom the ceiling was left sagging, there was no insulation in ceiling or walls, the door was untrimmed, siding was left partially undone and the windows weren't trimmed; holes were left unrepaired around the pipes in the home. The sum of Five Thousand Dollars ($5,000) was paid by St. Paul Fire and Marine Insurance Company in full settlement of the claims arising under the general contractor's bond. Additional money, approximately Thirty-Five Hundred Dollars ($3,500), was spent by Mrs. Loewe in addition to the Five Thousand Dollars ($5,000.00) received from the bonding company in order to complete the jobs contracted for. Although there were minimum changes In the job as originally contracted for, work is still going on to complete the original work contracted for by the Respondent. The building inspector for the City of Tampa Building Bureau, Tom Burgoyme, inspected the job site on several occasions during the progress on the work contracted for between Mrs. Loewe and the Respondent. He found building code violations and submitted a list of corrections to the Respondent, Mr. Jones, which were not remedied. A number of problems arose during the construction work, some of which was not the fault of the Respondent. Another contractor was involved in the work on the project. Funds in excess of the purchase price were paid to the Respondent and funds in excess of Eighty-Five Hundred Dollars ($8,500) were needed or will be needed to complete the project.

Recommendation Revoke the general contractor's license of Respondent, Number C GC007323. DONE and ORDERED this 7th day of April, 1977, in Tallahassee, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 W. Bert Jones 2300 Greenlawn Street Brandon, Florida 33511

# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JERRY A. JENNINGS, 84-003859 (1984)
Division of Administrative Hearings, Florida Number: 84-003859 Latest Update: Dec. 04, 1990

Findings Of Fact At all times relevant hereto, respondent, Jerry A. Jennings, held certified general contractor license number CG C020766 and certified residential contractor license number CR CO2OO84 issued by petitioner, Department of Professional Regulation, Florida Construction Industry Licensing Board. He has held the licenses since June, 1981 and February, 1982, respectively. Then the relevant events herein occurred, Jennings was operating a construction business under the name of Quality Control Construction in Port St. Lucie, Florida. He now resides in Casselberry, Florida and is no longer active in the construction business. Respondent formed Quality Control Construction (QCC) in January, 1981 and operated under that name as a subcontractor doing interior trim work on condominium projects in the Port St. Lucie, Florida area. Respondent did not qualify QCC with the State. In May, 1982, Jennings met with the project manager for Riverside Associates, Limited (Riverside), a development firm in Fort Pierce, Florida, and agreed to serve as general contractor and construction coordinator on a Riverside project in Fort Pierce. The job involved the renovating of an old three-story structure known as the Fort Pierce Hotel into an office building. The agreement was entered into by Riverside and respondent doing business as Quality Control Construction. Jennings applied for and obtained all applicable building permits on the job using his state contractor's license. Under the terms of the agreement Riverside agreed to make payments to QCC which in turn was responsible for insuring payment to the subcontractors and materialmen on the job. The work on the project was done in phases. The first phase was completed in January, 1983 when a partial certificate of occupancy was issued by the City of Fort Pierce. Because of a cash flow problem on the part of the developer, work on the next phase did not commence until June, 1983. At that time, QCC and Jennings agreed to finish the job and Jennings obtained all applicable permits. Although Jennings claims it did not include any electrical work, it is found that the last phase included a subcontract agreement by Jennings and White Electric Company (White) for White to do all remaining electrical work for a cost of $2,994. This is evidenced by the fact that Jennings obtained a permit on July 18, 1983 to do additional structural, electrical and air conditioning work on the project, and corrobarative testimony by a representative of White. On August 9, 1983, White submitted a bill to QCC for $2,994 representing the work performed by that subcontractor. Jennings forwarded the bill to Riverside, and on August 22, 1983, Riverside cut a check in that amount payable to QCC. The check contained the notation "For Payment to White Electric." The check was deposited by QCC into its bank account the following day. When White did not receive payment from QCC it contacted Riverside to obtain payment. A representative of Riverside attempted to locate Jennings but learned he had moved and his telephone was disconnected. After some investigation, Riverside determined that respondent had moved to Pinellas County. A certified letter was sent by Riverside to Jennings in October, 1983 requesting payment of the money due White but he did not reply. In November, 1983 a Riverside representative talked by telephone with Jennings who advised Riverside that he had financial problems and used the money due White to relocate to the west coast. Respondent did not timely notify petitioner of his change in address from Fort Pierce to Pinellas County. Riverside eventually set up a payment schedule and finally fully reimbursed White in April, 1984. To date, Jennings has not repaid Riverside. Jennings now resides in Central Florida, is in the process of filing a bankruptcy petition, and does not use his contracting licenses. Jennings claimed at hearing that Riverside never fully paid him for his services and therefore he was justified in retaining the $2,994 intended for White. However, he did not file a lien on the job, made no formal demands for the money allegedly due, and presented no documentation to support the claim.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that respondent be found guilty as charged in Counts I, II and III of the administrative complaint and that he pay a $1,000 administrative fine. It is further recommended that his two contracting licenses be suspended for one year, but if full restitution is made to Riverside, the suspension period be reduced to thirty days. DONE and ORDERED this 2nd day of May, 1985, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 2nd day of May, 1985. COPIES FURNISHED: W. Douglas Beason, Esquire 130 North Monroe St. Tallahassee, Florida 32301 Jerry A. Jennings 420 Copperstone Circle Casselberry, Florida 32707

Florida Laws (4) 120.5715.07489.119489.129
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JACK A. MARTIN, 83-002941 (1983)
Division of Administrative Hearings, Florida Number: 83-002941 Latest Update: Jun. 26, 1984

Findings Of Fact The Respondent is a certified general contractor holding license number CG C016888. The Petitioner is an agency of the State of Florida charged with enforcing the provisions of Chapter 489, Florida Statutes, regulating the licensure and practice status and standards of building contractors in the State of Florida and enforcing the disciplinary provisions of that chapter. On December 14, 1981, Respondent contracted with Mr. and Mrs. Frank J. Sullivan to build the Sullivans a home in Sarasota County, Florida. Those parties entered into a contract whereby the Respondent was to be paid the actual cost of construction including all labor and materials plus a commission in the amount of 8 percent of the actual cost of construction, provided however, that the total contract price would not exceed $49,000, including actual costs and commission. In January, 1982, Respondent commenced work constructing the home. The Respondent worked on the home for several months and then abruptly ceased and abandoned construction without explanation on May 14, 1982. At this time the house was approximately 70 percent complete. At the time the Respondent ceased work on the project he had already been paid $47,362.29 or approximately 97 percent of the total contract price agreed to by the parties. The Sullivans thereafter had to pay $10,633.53 to subcontractors and materialmen who had been hired by the Respondent to supply labor and/or materials to the house, at the Respondent's direction, prior to his ceasing construction and leaving the job. Additionally, the Nokomis Septic Tank Company, Inc., the subcontractor who installed the septic tank, was owed $1,180.07 by the Respondent for the installation of the septic tank, which amount was to have been paid out of the total $49,000 contract price. The Respondent failed to pay Nokomis Septic Tank Company, which then filed a mechanic's lien on the property. In order to remove this cloud on their title to the property and avoid foreclosure of the lien, the Sullivans were forced to pay the $1,180.07 amount of the lien. In addition to more than $10,000 paid to subcontractors who had already performed labor or supplied materials to the job before the Respondent left it, the Sullivans had to obtain a loan from their bank in order to finish the project. The contracted for items which the Respondent had left undone (approximately 30 percent of the construction) required them to expend $18,662.04 to complete the dwelling in a manner consistent with the contractual specifications. The items which remained to be constructed or installed are listed on Petitioner's Exhibit 7 in evidence. The remaining amount of contract price which the Respondent was due upon completion of the job would have been $1,737.71. With this in mind, as well as the fact that the Sullivans had to pay in excess of $10,000 to defray already outstanding bills to subcontractors for labor and materials already furnished and then had to obtain a loan in order to pay $18,662.04 in order to complete the house, and it being established without contradiction that the Respondent was unable to make his payroll at the point of leaving the job, the Respondent obviously used substantial amounts of the funds he received from the Sullivans for purposes other than furthering the construction project for which he contracted with the Sullivans. Concerning Count II, on December 22, 1981, Frederick Berbert doing business as Venice Enclosures of Venice, Florida, contracted with Mr. Emory K. Allstaedt of Grove City, Florida, Charlotte County, to build an addition to Mr. Allstaedt's mobile home. The contract specified a price of $4,952 for which Berbert was required to construct a 12-foot by 20-foot enclosure or porch. Mr. Allstaedt never did and never intended to contract with the Respondent, Mr. Martin, rather, his contract was only with Frederick Berbert. Mr. Berbert was a registered aluminum specialty contractor in Sarasota County. He was not registered or licensed to practice contracting in Charlotte County where Mr. Allstaedt lived and where the porch was to be constructed. On December 28, 1981, the Respondent obtained building permit number 72030 from the Charlotte County Building and Zoning Department to construct a "Florida room" for Mr. Allstaedt's mobile home, the same room to be constructed by Mr. Berbert. Under Charlotte County Ordinances in evidence as Petitioner's Exhibits 13 and 13A, only a properly licensed "A", "B" or "C" contractor or a registered aluminum contractor can perform this type of job. The Respondent was appropriately licensed for this type of work in Charlotte County, but Mr. Berbert was not and thus could not obtain the permit in his own right. The Respondent's only connection with this job was obtaining the permit in his own name as contractor of record and in performing some minor work in replacing some damaged sheets of paneling shortly after the construction of the room addition and after the performance of the contract by Berbert. Though the Respondent listed himself as contractor in order to be able to obtain a building permit for the job, he never qualified as the contractor of record nor "qualified" Mr. Berbert's firm with the Construction Industry Licensing Board. Both Mr. Berbert and the Respondent were aware that Mr. Berbert could not legally perform contracting in Charlotte County at the time the Respondent obtained the building permit on Berbert's behalf.

Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence of record and the candor and demeanor of the witnesses, it is, therefore RECOMMENDED: That the contractor's license of Jack A. Martin be suspended for a period of ten (10) years, provided however, that if he makes full restitution to the Sullivans of all monies they expended for labor, materials and permits to enable them to complete the work he had contracted to perform, within one year from a final order herein, that that suspension be reduced to three (3) years after which his license should be reinstated. DONE and ENTERED this 27th day of April, 1984, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of April, 1984. COPIES FURNISHED: Charles P. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Jack A. Martin 305 Park Lane Drive Venice, Florida James Linnan, Executive Director Florida Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred M. Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (5) 120.57180.07489.127489.129658.28
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs WILMON RAY STEVENSON, 90-001637 (1990)
Division of Administrative Hearings, Florida Filed:Inverness, Florida Mar. 15, 1990 Number: 90-001637 Latest Update: Oct. 24, 1990

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are made: At all times material to this proceeding, Respondent Wilmon Ray Stevenson was licensed as a registered building contractor in the state of Florida, holding license numbers RB 0035005 and RB A035005. License number RB 0035005 was issued on an active status qualifying an Individual in March 1987 and is still in effect. License number RB 0035005 replaced license number RR 0035005 issued in December, 1980. License number RB A035005 was issued on an active status qualifying Yankee Construction, Inc. d/b/a Olympic Homes of Citrus County (Olympic) in June 1987 and replacing license number RR A035005 issued in August 1981. In October, 1988 Respondent submitted a change of status application which was not acted upon by Petitioner until February, 1989 when it was deleted. However, Petitioner's file (Petitioner's Exhibit 1, page 2) indicates the license was in effect only until October, 1988. The Marion County Building Department was advised of this status change in September, 1988. Findings As To Case No. 90-1637 On April 16, 1988, Frank and Margaret Orkwis entered into a contract with Olympic to construct a home for $37,900 which was later modified, increasing the contract price to $39,363.00. On July 26, 1988 a permit for the Orkwis job was obtained from the Marion County Building Department in accordance with the Respondent's letter dated January 25, 1985 authorizing certain individuals to "pull" permits on his license. There was a total of $27,583.20 paid to Olympic on the Orkwis contract which included $27,483.20 paid by draw schedules and $100.00 as a down payment. Olympic stopped work on the Orkwis home sometime around November 27, 1988 and failed to complete the work under the contract. Olympic gave no notice to Orkwis that it intended to terminate the work on the Orkwis job. In fact, Olympic kept putting Mrs. Orkwis off about completing the job until sometime in late January, 1989 or early February, 1989 when she decided to get a permit and complete construction. Olympic terminated the Orkwis job without just cause. The following liens were recorded against the Orkwis property for the failure of Olympic to timely pay for materials and labor furnished to Olympic for the Orkwis's job in accordance with Orkwis contract: (a) Florida A/C Sales and Services, Inc., filed December 13, 1988 and; (b) Florida Forest Products, Inc. filed December 15, 1988. The labor and materials had been furnished between October 24, 1988 and November 22, 1988. Olympic was contacted by Mrs. Orkwis concerning the liens, with no response. However there was insufficient evidence to establish that the liens had not been removed from the property, by payment or bond, within 30 days after the date of such liens. Sometime in early 1989, Mrs. Orkwis obtained a permit and she and her husband completed the home. Although Mr. Orkwis had obtained an estimate of $27,050.00 from a contractor to complete the home, she and her husband invested 466.5 hours of their time and $10,340.00 for materials to complete the home. In addition to the material, a reasonable amount for labor to complete the home would be $10,000.00. Findings As To Case No. 90-1889 John J. and Josephine Grillo and Madeline Chapman entered into a contract with Olympic for construction of a home on June 11, 1987. A permit was obtained for the Grillo/Chapman home under Respondent's license. The Grillo/Chapman home was completed and a certificate of occupancy issued January 13, 1989. Olympic was paid in full under the contract. Before the expiration of the one-year warranty under the contract, Olympic was advised of certain problems with the construction which Olympic attempted to correct. It is unclear whether the problems were satisfactorily corrected by Olympic but it appears that the only complaint not resolved was a water stain on the carpet that was the result of water seeping in under a door. Respondent was not aware of these problems until after the expiration of the one-year warranty and upon learning of the problems, commented that he was not obligated since the warranty had expired. There was insufficient evidence to establish that the problems were not corrected in accordance with contract. Findings As To Case No. 90-1890 Veronica McPherson entered into a contract with Olympic on March 1, 1989 to construct a home for the contract price of $36,450.00 which was later modified increasing the contract price to $37,775.00. All permits were obtained under the Respondent's license pursuant to a letter dated January 15, 1985 authorizing certain individuals to "pull" permits under Respondent's license. McPherson paid $26,442.50 to Olympic pursuant to a draw schedule in the contract as the home was being constructed. Additionally, McPherson paid a $100.00 down payment. All work performed by Olympic pursuant to the McPherson contract was prior to November 22, 1988. The exact date of termination of work is uncertain. Olympic notified McPherson that it had terminated work and would not complete construction of the home. The exact date of this notification is uncertain. There is no evidence that notice was not given within 90 after termination of work. Olympic terminated work without just cause. McPherson paid a roofing contractor $998.00 to complete the roof on her unfinished home in order to protect the interior. McPherson was financially unable to complete construction of the home. A reasonable estimate to complete construction of the McPherson home at the time work ceased would be $20,000.00. On December 15, 1988 Florida Forest Products, Inc. recorded a lien on December 15, 1988 against the McPherson property for building materials furnished to the McPherson job on order of Olympic on October 24, 1988 for construction of the home pursuant to the McPherson contract in the amount of $1,450.08. There was insufficient evidence to establish that this lien had not been removed from the McPherson property, by payment or bond, within 30 days after the date of such lien. There were three other claims of liens for labor and materials furnished to the McPherson job on order of Olympic between October 19, 1988 and December 2, 1988 for construction for the home pursuant to the McPherson contract as follows: (a) Florida A/C Sales and Services, Inc. dated December 8, 1988 for $1,059.00; (b) Masons Concrete of Crystal River dated December 14, 1988 for $354.97 and (c) Panning Lumber Company, a Division of Wheeler Consolidated, Inc. for $2,284.13. There is no evidence that any of the above liens were ever recorded against the McPherson property. Likewise, there is no evidence to establish that these liens had not been removed from the McPherson property, by payment or bond, within 30 days after the date of such lien, if in fact they were recorded. General Findings Respondent was advised by Larry Vitt in February, 1988 that Olympic was having financial problems. Respondent never supervised the financial aspects of Olympic. Respondent did not participate in the contract process or supervision of the construction of homes contracted to be built by Olympic. More specifically, he did not participate in the contract process or the supervision of the construction of the Orkwis, McPherson or Grillo/Chapman homes. Respondent's main purpose in being involved with Olympic was to use his license to qualify Olympic and to contract all of Olympic's concrete block work. In March, 1989 Respondent advised the Marion County Building Department that no one was authorized to "pull" permits under his license. However, at no time did Respondent withdraw the permits for the Orkwis and McPherson jobs that had been issued under his license. The record is clear that Respondent did not understand his relationship with Olympic nor did he understand the responsibility he incurred when he used his license to qualify Olympic. However, his inexperience or ignorance in this regard does not relieve him of his responsibility to those whose homes were built or not completely built pursuant to a permit issued under his license.

Recommendation Having considered the foregoing Findings of Facts and Conclusions of Law, the evidence of record, the demeanor of the witnesses and the disciplinary guidelines set out in Chapter 21E-17, Florida Administrative Code, it is RECOMMENDED: That the Board enter a final order finding Respondent guilty of violating Section 489.129(1)(k) and (m), Florida Statutes, and for such violations it is Recommended that the Board assess the Respondent with an administrative fine of $2,500.00. It is further Recommended that Counts I and II for the Administrative Complaint in Case Nos. 90-1637, 90-1889, and 90-1890 be Dismissed. DONE and ORDERED this 24th day of October, 1990, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of October, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 90-1637 The following constitute my specific rulings pursuant to Section 120.59(20, Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Rulings of Proposed Findings of Fact Submitted by the Petitioner 1. Covered in Conclusions of Law. 2.-8. Adopted in Findings of Fact 1, 2, and 3. 4.-6. Adopted in Findings of Fact 15, 16, and 17, respectively. 7. Adopted in Findings of Fact 19 and 20, but modified. 8.-12. Adopted in Findings of Fact 18, 4, 5, 6, and 8, respectively. 13.-14. Adopted in Findings of Fact 9 and 10, respectively, but modified. Adopted in Findings of Fact 21 through 25. Restatement of testimony; not stated as a Finding of Fact but see Findings of Fact 10 and 14. Adopted in Findings of Fact 13 through 15. Adopted in Findings of Fact 16, but modified. Rulings of Proposed Findings of Fact Submitted by Respondent 1. Covered in Preliminary Statement. 2.-8. Adopted in Findings of Fact 1, 2, 3, 3, 15, 15, and 16, respectively. 9. Adopted in Findings of Fact 19 and 20. 10.-11. Adopted in Findings of Fact 18 but modified. Adopted in Finding of Fact 4. Adopted in Findings of Fact 4 and 6. Adopted in Finding of Fact 5. Adopted in Findings of Fact 8 and 9. 16.-20. Adopted in Findings of Fact 7, 7, 11, 13 and 14, respectively, but modified. Not material. Adopted in Finding of Fact 3, but modified. Not material. Copies furnished to: Fred Seely, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, FL 32202 Kenneth E. Easley, General Counsel Department of Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 G. W. Harrell, Esquire Department of Professional Regulation 1940 North Monroe Street Suite 60 Tallahassee, FL 32399-0792 Fred A. Ohlinger, Esquire P.O. Box 1007 Beverly Hills, FL 32665

Florida Laws (4) 120.57489.105489.129583.20
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs AL CLYDE HUFELD, 94-006781 (1994)
Division of Administrative Hearings, Florida Filed:Miami, Florida Dec. 05, 1994 Number: 94-006781 Latest Update: May 29, 1996

The Issue This is a license discipline proceeding in which the Petitioner seeks to take disciplinary action against the Respondent on the basis of alleged violations of Chapter 489, Florida Statutes, (1992 Supp.). Specifically, the Respondent has been charged in a four-count Administrative Complaint with violations of paragraphs (k), (m), (n) and (p) of Section 489.129(1), Florida Statutes (1992 Supp.).

Findings Of Fact Respondent is, and has been at all times material hereto, a licensed Certified General Contractor, having been issued license number CG C007303, by the State of Florida. At all times material hereto, the Respondent was licensed to contract as an individual. On September 18, 1992, the Respondent, doing business as an individual, contracted with Charles and Elba Williams (hereinafter referred to as "Customers") to reroof their dwelling and shed at 15205 SW 78 Place, Miami, Florida, for the price of Fifteen Thousand, One Hundred Seventeen dollars ($15,117.00). On October 1, 1992, the aforementioned contract was amended to provide for the payment of half of the second draw before the second stage of the project was completed, and to provide for the payment of an additional Three Hundred and Fifty One dollars ($351.00) in materials. On November 5, 1992, the aforementioned contract was amended to provide the Customers with a credit on the contract of One Thousand, Six Hundred Thirty Six dollars and Sixty Four cents ($1,636.64) for their purchase of roof shingles. The revised contract price was Sixteen Thousand and Fifty Eight dollars ($16,058.00). The Customers paid the Respondent Twelve Thousand, Two Hundred Seventy Seven dollars and Ninety cents ($12,277.90) toward the contract. After receiving a credit on the balance due on the contract, the Customers owed Two Thousand, One Hundred Forty Two dollars and Thirty Two cents ($2,142.32) to the Respondent. On September 23, 1992, the Respondent obtained roofing permit number 92-110050 for the Customers' project from the Dade County Building and Zoning Department. The Respondent worked on the Customers' roof from September 23, 1992, through November 15, 1992, when the installation of the shingles was completed. On November 19, 1992, the Respondent failed a final inspection performed on the Customers' roof by the Dade County Building and Zoning Department because the Respondent failed to supply Dade County with product approval information and manufacturer installation specifications for the ridge vent he had installed. On November 24, 1992, the Respondent again failed a final inspection performed on the Customers' roof by the Dade County Building and Zoning Department for the same reason as on November 19, 1992. The Respondent never obtained a passing final inspection on the Customers' roof from the Dade County Building and Zoning Department. On November 24, 1992, the Customers sent the Respondent a Certified letter, Return Receipt requested, informing the Respondent that the roof could not pass final inspection until Dade County was provided with the product approval information and manufacturer installation specifications for the ridge vent he had installed. On December 4, 1992, the Respondent was issued a Notice of Violation from the Dade County Building and Zoning Department for failure to provide product approval information and manufacturer installation specifications for the ridge vent that had been installed on the Customers' roof. On December 4, 1992, the Respondent was issued a Notice of Violation from the Dade County Building and Zoning Department for failure to remove construction debris from the Customers' property. The Respondent did not comply with either Dade County Notice of Violation and did not supply the Dade County Building and Zoning Department with the product approval information and manufacturer installation specifications for the ridge vent that had been installed on the Customers' roof. The Customers were left with a roof that did not comply with Dade County Code. On March 26, 1993, the Customers paid a Forty Five dollar ($45.00) renewal fee to the Dade County Building and Zoning Department and had the roofing permit renewed and reissued in their own names. On March 4, 1993, the Customers paid another contractor, Mark Mitchell, Two Hundred dollars ($200.00) to remove the ridge vent and close the hole in the roof left by the removal of the ridge vent. On March 27, 1993, after the ridge vent had been removed, the Customers paid a Special Investigator, Ken Nash, Fifty dollars ($50.00) to perform a final inspection of the roof. On March 31, 1993, Ken Nash performed a final inspection of the roof and the roof passed inspection. The Customers paid Steve Wooten Thirty dollars ($30.00) to remove construction debris left on their property by the Respondent and to bring their property in compliance with the Notice of Violation issued on December 4, 1992.

Recommendation On the basis of all of the foregoing, it is RECOMMENDED that the Construction Industry Licensing Board issue a Final Order in this case to the following effect: Dismissing the charges alleged in Counts I, II, and IV of the Administrative Complaint; Concluding that the Respondent is guilty of the violation charged in Count III of the Administrative Complaint; and Imposing a penalty consisting of a fine in the amount of Two Hundred Fifty dollars ($250.00) for the violation charged in Count III of the Administrative Complaint. DONE AND ENTERED this 3rd day of May, 1995 in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of May, 1995. COPIES FURNISHED: Diane Snell Perera, Esquire Department of Business and Professional Regulation 7300 North Kendall Drive, Suite 780 Miami, Florida 33156 Mr. Al C. Hufeld Post Office Box 681064 Orlando, Florida 32868-1064 Richard Hickok, Executive Director Construction Industry Licensing Board 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Lynda Goodgame, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (2) 120.57489.129 Florida Administrative Code (2) 61G4-17.00161G4-17.002
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. TOMAS PEREZ, D/B/A LIFETIME CHEMICALS OF AMERICA, 79-002173 (1979)
Division of Administrative Hearings, Florida Number: 79-002173 Latest Update: Aug. 25, 1980

The Issue At issue herein is whether or not the Respondent/Licensee, Tomas Perez, d/b/a Lifetime Chemicals of America, Inc. (Lifetime), engaged in conduct which will be set forth hereinafter in detail, which warrants the Florida Construction Industry Licensing Board (Board) to take disciplinary action respecting his license and to impose an administrative fine based on said alleged conduct.

Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, the arguments of counsel and the entire record compiled herein, the following relevant facts are found. Tomas Perez, d/b/a Lifetime Chemicals of America, Inc. (Respondent), is a certified general contractor who holds license No. CGCA 04170, which is active. On September 24, 1975, Mr. Perez used his license to qualify Lifetime Chemicals of America, Inc., as the entity through which he would conduct his business activities (Petitioner's Exhibit 1). On August 15, 1978, Lifetime Chemicals of America, Inc. , entered into an agreement with James Laughery of Fort Myers, Florida, for a franchise agreement to use Lifetime's license in the immediate area of Fort Myers, Florida (Petitioner's Exhibit 5). That agreement provides, among other things, that Respondent Lifetime authorized James Laughery to use its license in the Fort Myers area for a fee of $50.00 per job or $1,500.00. The agreement does not provide, nor was any evidence offered to establish that Respondent Perez played any supervisory or managing role in agent Laughery's contracting activities in the Fort Myers area. During October of 1978, Mr. Andrew Szarfran entered into an agreement with Respondent's agent, Laughery, to perform certain roofing repairs to his residence for the sum of $1,000.00. Mr. Szarfran paid Laughery $500.00 and Laughery abandoned the project prior to completion (Testimony of Szarfran and Petitioner's Composite Exhibit 4). Mr. Szarfran engaged the services of another contractor to complete the project. On May 17, 1979, the Lee County Construction Board reviewed a complaint filed against Respondent by the Szarfrans. Based on that review, the Lee County Construction Board revoked Respondent's licensing privileges in the county at its June, 1979, meeting (Petitioner's Exhibits 3 and 4 and testimony of witnesses Richard M. McDole and Maxine Allred, Administrative Director of Court Enforcement and Permit Clerk, respectively, for Lee County). On or about October 17, 1978, Respondent's agent, Laughery, also entered into an agreement with Mr. and Mrs. Arthur Swanson for the erection of aluminum siding to the exterior walls of their residence for a full price of $5,000.00. The Swansons gave Respondent's agent, Laughery, a downpayment of $2,500.00 and agent Laughery abandoned the project prior to the commencement of any work (Petitioner's Exhibits 7 and 8 and testimony of Mrs. Swanson). Richard Newmes, the chief inspector for building and zoning, Cafe Coral, Florida, testified that the Construction Industry Licensing Board for Cape Coral, Florida, revoked Respondent's contractor license on January 17, 1979, based on his violation of Cape Coral Code Section 5-1/2 - 21(J), to wit: "Failure to make good faulty workmanship or materials performed or installed to evade performance of the contract or specifications as agreed upon." (Petitioner's Exhibit 9.) On or about January 4, 1979, Lifetime Chemicals of America, Inc., became aware of its agent, James Laughery's mismanagement of funds and his failure to honor contractual obligations he had entered in the Fort Myers area. Respondent and its agent Laughery therefore entered into an agreement which rendered the franchise agreement between the parties null and void. Agent Laughery, in said agreement, promised to pay, from his commissions due, monies owed to Lifetime Chemicals, Inc., which apparently was brought about due to the restitution that Lifetime Chemicals had made to customers whom agent Laughery had defaulted. As mitigating evidence, it was noted that the Respondent, Tomas Perez, was not party to or familiar with the activities and/or difficulties that the designated agent for Lifetime Chemicals of America, Inc., James Laughery, was encountering in the Fort Myers vicinity before early January, 1979. As soon as Respondent became aware of Laughery's problems, steps were immediately taken to halt such acts insofar as they related to Respondent (Testimony of Tomas Perez and Michael Arfaras).

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law and the mitigating evidence which revealed that although the Petitioner is authorized and in fact holds the qualifier license of a registered entity responsible for the acts of its agents, in view of the undisputed evidence which reflects that neither Respondent Perez or Respondent Lifetime Chemicals of America, Inc., in any manner benefited from the acts of its agents and in fact attempted to thwart the illegal acts of its agent as soon as such became known, it is hereby RECOMMENDED: l. That the Respondent, Tomas Perez's Certified General Contractor's license, CGCA 04170, be placed on probation for a period of one (1) year. 2. That the Respondents, Tomas Perez and Lifetime Chemicals of America, Inc. , be issued a written letter of reprimand. RECOMMENDED this 24th day of April, 1980, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of April, 1980. COPIES FURNISHED: Barry Sinoff, Esquire 2400 Independent Square Jacksonville, Florida 32202 Tomas Perez 2395 West 12th Avenue Hialeah, Florida 33010 Michael Harold Arfaras 820 S.W. 20th Avenue Miami, Florida 33135 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. CASE NO. 79-2173 THOMAS PEREZ, CGCA 04170 Respondent. /

Florida Laws (1) 120.57
# 6
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs FRED T. GARRETT, 01-003479PL (2001)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Aug. 31, 2001 Number: 01-003479PL Latest Update: Jul. 03, 2002

The Issue The issues are whether Respondent committed the several violations of Sections 489.129(1)(h)2.,(h)3.,(j),(k), and (n), Florida Statutes (1997), for the reasons stated in the respective Administrative Complaints and, if so, what, if any, penalties should be imposed. (All chapter and section references are to Florida Statutes (1997) unless otherwise stated.)

Findings Of Fact Petitioner is the state agency responsible for regulating the practice of contracting. Respondent is licensed as a certified general contractor pursuant to license number CG C059414. At all relevant times, Respondent was the qualifying agent for Fred T. Garrett Construction, Inc. ("FTG"). As the qualifying agent, Respondent was responsible for all of FTG's contracting activities in accordance with Section 489.1195, Florida Statutes. Respondent failed to obtain a certificate of authority for Fred T. Garrett Construction, Inc., as required by Section 489.119(2), Florida Statutes. The St. Cyr Case On or about August 21, 1998, Respondent entered into a contract with Louis L. St. Cyr to construct an addition to the residence located at 201 South Bel Air Drive, Plantation, Florida. The contract price was $50,000. Although Mr. St. Cyr paid $2,500 to Respondent, Respondent failed to commence work and canceled the project, thereby abandoning it without just cause and without proper notification to Mr. St. Cyr. The contract did not permit Respondent to keep the $2,500 paid by Mr. St. Cyr, and Respondent failed to refund the payment within 30 days after abandonment. Out of the $2,500 he received from Mr. St. Cyr, however, Respondent paid $1,600.00 to the architect before abandoning the project. Thus, the net amount that Respondent owes to Mr. St. Cyr is $900. Petitioner incurred a total of $1,092.28 in investigative costs relating to the St. Cyr case. The Forney Case On May 22, 1998, Respondent, who was doing business as FTG, entered into a contract with Mr. Warren Forney for the construction of a two-bedroom, one-bath addition to the residence located at 1698 Northeast 33rd Street, Oakland Park, Florida. The contract price was $32,500. The contract with Mr. Forney did not contain a written statement explaining the customer’s rights under the Construction Industries Recovery Fund, as required by Section 489.1425(1), Florida Statutes. On July 7, 1998, Respondent obtained permit number 98-050297 from the Oakland Park Building Department. Construction commenced on or about July 7, 1998, and continued sporadically until October 29, 1998, when Mr. Forney dismissed Respondent for failure to timely complete the project. The Oakland Park Building Department issued notices of violation against the project on August 3, September 11, and October 14, 1998, for various building code violations. Mr. Forney was forced to obtain a homeowner’s permit and subsequently hired a subcontractor to complete the work. Mr. Forney paid Respondent approximately $29,250 before relieving Respondent of his duties. To complete the project, Mr. Forney paid a total of $48,746.52, which was $15,396.52 over and above the original contract price. Petitioner incurred a total of $2,190.78 in investigative costs relating to the Forney case. The Kong Case In or around January 1998, a contractor named Lakeview Concepts hired Respondent to perform demolition work for the Kong dry cleaning store project on the property located at 5171 South University Drive, Davie, Florida. On or about June 17, 1998, permit 98-00002349 was issued to Respondent to perform alterations on commercial property located at 5171 South University Drive, Davie, Florida. Respondent, however, did not yet have a contract with the owner for this work. The next month, on or about July 30, 1998, Respondent, who was doing business as FTG, entered into a contract with Shek Kong to complete the dry cleaning store project at 5171 South University Drive, Davie, Florida, for the contract price of $22,300. Shek Kong made payments to Respondent totaling $16,000. Respondent’s work was of poor quality, however, and on or about November 6, 1998, he ceased work, though the project had not been completed. On or about November 14, 1998, Douglas Frankow, license number CB C052960, gave Mr. Kong an estimate of $20,562 to complete the project. Thereafter, on or about June 30, 1999, Mr. Kong contracted with George Settergren, another licensed contractor, to complete the project for a contract price of $27,956. On December 9, 1999, in Case No. 98-020065 08, the Circuit Court, Seventeenth Judicial Circuit, Broward County, Florida, rendered a Final Judgment against Respondent and in favor of Mr. Kong. This judgment awarded Mr. Kong the total amount of $28,693.30, plus 10 percent interest per annum. Petitioner incurred a total of $2,502.78 in investigative costs relating to the Kong case.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Construction Industry Licensing Board enter a Final Order finding Respondent guilty of violating Sections 489.129(1)(h)2., (h)3., (j), (k), and (n), Florida Statutes, imposing administrative fines in the aggregate amount of $3,700, assessing investigative costs in the aggregate amount of $5,785.84, placing Respondent's license on probation for a period of four years from the date the Final Order is entered by the Board, and awarding payment of restitution to each customer as follows: (1) to Warren Forney, the amount of $15,396.52; (2) to Shek Kong, satisfaction of the unpaid civil judgment in the amount $28,693.30, plus 10 percent interest accrued thereon; and (3) to Louis L. St. Cyr, the amount of $900. DONE AND ENTERED this 15th day of February, 2002, in Tallahassee, Leon County, Florida. _________________________________ JOHN G. VAN LANINGHAM Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 15th day of February, 2002.

Florida Laws (7) 17.00117.002489.119489.1195489.127489.129489.1425
# 7
PINELLAS COUNTY CONSTRUCTION LICENSING BOARD vs DAVID G. BEERS, 00-002434 (2000)
Division of Administrative Hearings, Florida Filed:Largo, Florida Jun. 12, 2000 Number: 00-002434 Latest Update: Oct. 05, 2024
# 8
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION vs RALPH N. BATTAGLIA, INTERCONTINENTAL CONSTRUCTION CORPORATION, INC., 07-000052PL (2007)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jan. 04, 2007 Number: 07-000052PL Latest Update: May 08, 2007

The Issue Whether Respondent committed the violations alleged in the Amended Administrative Complaint issued against him and, if so, what disciplinary action should be taken.

Findings Of Fact Based on the evidence adduced at hearing, and the record as a whole, the following findings of fact are made to supplement and clarify the facts to which the parties stipulated at the outset of the final hearing (Parties' Stipulations)2: The contract referenced in the Parties' Stipulations (Building Contract) was signed by Mr. Stasinos (on behalf of ICC) and Mr. Skiera (on behalf of himself and his wife) on June 29, 2000. The home that ICC agreed to build for the Skieras (Skiera Residence) was described in the Building Contract as a "[c]ustom two-story residence with detached garage and riding cor[r]al for a total of 5,370 square feet." It was to be constructed on a tract of land owned by the Skieras in Boynton, Beach, Florida. The Building Contract provided for the following allowances: $20,000.00 for "electrical"; $17,000.00 for "plumbing"; $15,000 for "HVAC"; a "door hardware allowance" of "$50.00 per [interior] door"; $6,000.00 for a "stacked stone veneer" exterior; an "entry door hardware allowance" of "$100.00 per door"; $15,000.00 for "kitchen cabinetry and vanity"; $8,000.00 for "counter tops and vanity tops"; $9,000.00 for "landscaping," including "trees, shrubs, sod, automatic time clock, [and an] operated irrigation system with rain sensor"; and $7,000 for "driveways, walkways, [and] flatwork." There was no written statement in the Building Contract explaining a consumer's rights under the Construction Industries Recovery Fund, as then required by Section 489.1425, Florida Statutes. The Building Contract contained a "[p]ayment [d]raw [s]chedule," which provided as follows: Upon execution of contract: 10%- $36,608.00 Thereafter, progress payments based on schedule of values. This "schedule of values" (referred to in the "[p]ayment [d]raw [s]chedule") contained the following "scheduled values" (excluding change orders): 1. Permits $21,600.00 2. Clearing/Grading/Fill $10,800.00 3. Foot'gs. Undgr Plumb, Soil Treatmt $23,000.00 4. Foundation/Slab poured $32,760.00 5. Exterior Walls/Tie Beam $26,600.00 6. Roof Trusses $26,600.00 7. Roof Sheathing/Felt $19,400.00 8. Interior Framing Complete $14,000.00 9. Windows/Exterior Door Frames Set $14,400.00 10. 2nd Plumbing/Tub Set $7,200.00 11. Wiring Rough-In $14,400.00 12. HVAC Ducts Installed $7,200.00 13. Roof Shingles/Tiles Installed $14,400.00 14. Insulation (wall & ceiling) $4,200.00 15. Exterior Trim/Soffits $11,800.00 16. Drywall Hung $14,400.00 17. Drywall Finish $10,800.00 18. Interior Trim/Interior Doors Installed $13,400.00 19. Interior Paint $8,800.00 20. Siding/Stucco $14,400.00 21. Exterior Paint Complete $8,800.00 22. Exterior Doors & Garage Door Install $6,200.00 23. Cabinets/Countertops Installed $10,000.00 24. Plumbing Finish $3,600.00 25. Electrical Finish $5,600.00 26. HVAC-Compressor/A.H. Installed $10,920.00 27. Driveway/Walks Installed $3,600.00 28. Landscaping/Irrigation $7,200.00 There were six separate change orders. They were dated August 20, 2000 (Change Order No. 001), August 29, 2000 (Change Order No. 002), September 26, 2000 (Change Order No. 003), October 15, 2000 (Change Order No. 004), October 15, 2000 (Change Order No. 005), and November 10, 2000 (Change Order No. 006). As of December 21, 2000, ICC had been paid in full for all six change orders, as well as for items 1 through 8 on the "schedule of values." As of February 27, 2001, ICC had received additional monies from the Skieras: payment in full for items 9 through 12 and 15 on the "schedule of values" and partial (50 percent) payment for items 13 and 20 on the "schedule of values." As of April 10, 2001, ICC had been paid a total of $287,966.20 (all from the proceeds of a mortgage loan the Skieras had obtained from Admiralty Bank) for work done on the Skiera Residence. On May 1, 2001, the Skieras paid ICC an additional $16,800.00 for drywall work, bringing the total amount of payments that ICC had received from (or on behalf of) the Skieras, as of that date, to $304,766.20. The Skieras made no further payments to ICC. The "eight valid claims of lien" referenced in the Parties' Stipulations were filed by eight different subcontractors, all of whom had been hired by ICC to work on the Skiera Residence: Boca Concrete Pumping, Inc.; Gulf Stream Lumber Company; L & W Supply Corp., d/b/a Seacoast Supply; Waste Management of Palm Beach; B.T. Glass & Mirror, Inc.; Boca Raton Decorating Center Company; American Stairs; and Broten Garage Door Sales Inc.3 Boca Concrete Pumping was the "very first" subcontractor to work on the construction of the Skiera Residence. It did the "slab work, the foundation" (referenced in item 4 of "schedule of values"). Its lien was recorded on December 6, 2000. The lien was in the amount of $1,001.25, and it indicated, on its face, that it was for unpaid "concrete pumping" that had been furnished between September 8, 2000, and September 22, 2000. A satisfaction of this lien, dated March 8, 2001, was filed March 24, 2001. Gulf Stream Lumber's original lien was recorded February 15, 2001. It was in the amount of $67,872.59, and it indicated, on its face, that it was for unpaid "building material" that had been furnished between August 15, 2000, and January 24, 2001. An amended claim of lien was recorded May 3, 2001, in the amount of $36,530.59 for unpaid "building material" that, according to the lien, had been furnished between August 25, 2000, and March 27, 2001. A satisfaction of the original lien and amended claim of lien, dated November 30, 2001, was filed December 5, 2001. The liens were satisfied, pursuant to the terms of a Settlement Stipulation, upon the Skieras' payment of $39,579.28 to Gulf Stream Lumber. L & W Supply's lien was recorded April 30, 2001. It was in the amount of $4,536.98, and it indicated, on its face, that it was for unpaid "building materials [and] related items" that had been furnished between December 16, 2000, and January 30, 2001. A satisfaction of this lien, dated October 11, 2001, was filed November 7, 2001. The lien was satisfied by the payment of $10.00 "and other good and valuable consideration" (which was the payment of an additional $2,850.00 by check dated October 11, 2001). Waste Management of Palm Beach's lien was recorded May 31, 2001. It was in the amount of $1,665.89, and it indicated, on its face, that it was for unpaid "[w]aste [r]emoval [s]ervices" that had been furnished between August 30, 2000, and April 5, 2001. A satisfaction of this lien, dated October 19, 2001, was filed November 13, 2001. B.T. Glass & Mirror's lien was recorded June 29, 2001. It was in the amount of $3,560.00, and it indicated, on its face, that it was for an unpaid "glass/mirror package" that had been furnished between May 3, 2001, and May 31, 2001. A satisfaction of this lien, dated October 19, 2001, was filed November 13, 2001. The lien was satisfied by the payment of $1,600.00 (by check dated November 10, 2001), plus an agreement to provide "$2,000.00 in gazebo or arbor products from the Hitching Post," the Skieras' family business. Boca Raton Decorating Center's lien was recorded May 19, 2001. It was in the amount of $1,218.79, and it indicated, on its face, that it was for unpaid "paint, sealers [and] sundries" that had been furnished between May 1, 2001, to May 2, 2001. A satisfaction of this lien, dated October 11, 2001, was filed November 7, 2001. American Stairs' lien was recorded August 16, 2001. It was in the amount of $4,188.00, and it indicated, on its face, that it was for unpaid "[s]tairs and [r]ailings" that had been furnished between June 8, 2001, and June 15, 2001. A satisfaction of this lien was executed on October 15, 2001. Broten Garage Door Sales' lien was recorded September 5, 2001. It was in the amount of $3,214.00, and it indicated, on its face, that it was for the unpaid "sale and installation of garage doors and openers," which took place between June 25, 2001, and July 17, 2001. A satisfaction of this lien, dated January 31, 2002, was filed on February 5, 2002. At a meeting "in the early part of August [2001]" attended by Respondent, Mr. Stasinos, the Skieras, and the president of the bank from which the Skieras had borrowed the money to pay for the construction of their residence, Respondent announced that, on behalf of ICC, "he was filing [for] bankruptcy."4 ICC stopped working on the Skiera Residence after this meeting. At the time, the Skiera Residence was approximately 70 to 80 percent completed (and the Skieras had paid ICC a total of $304,766.20, or approximately 80 percent of the total contract price (including change orders) of $378,286.205). In addition to paying $57,316.62 to satisfy the "eight valid claims of lien" referenced in the Parties' Stipulations, the Skieras paid approximately an additional $57,000.00 to other subcontractors who provided goods and/or services "needed to complete the house." The $10,000.00 check referred to in the Parties' Stipulation 14 (that the Skieras received from Andover Construction, Inc.) did not "represent any kind of final settlement" between the Skieras and ICC. The October 4, 2001, Certificate of Occupancy for the Skiera Residence referred to in the Parties' Stipulations indicated, on its face, that ICC was the contractor, notwithstanding that ICC had abandoned the project "in the early part of August [2001]." Respondent has been a Florida-licensed general contractor since July 29, 1987. In his capacity as ICC's licensed qualifier, he has previously (by Final Order filed in DBPR Case Nos. 2001-03283 and 2001-03284 on December 23, 2003) been found guilty of, and disciplined for, violating (in connection with two residential construction projects undertaken by ICC for A. Richard Nernberg) the same subsections of Section 489.129(1), Florida Statutes (Subsections (1)(g), (i), and (m)) that he is accused of violating in the instant case. In these prior disciplinary proceedings, Respondent's license was suspended for two years, and he was fined $6,000.00 and required to pay $958.30 in investigative costs. Administrative complaints were also filed against Respondent in DBPR Case Nos. 94-15958 and 97-17352. Both of these cases were resolved by settlement stipulations in which Respondent "neither admit[ted] [nor] denie[d] the allegations of fact contained in the [a]dministrative [c]omplaint[s]."

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Board issue a Final Order: finding Respondent guilty of violating Section 489.1425(1), Florida Statutes, as alleged in Count I of the Amended Administrative Complaint, and fining him $1,000.00 for this violation; (2) finding Respondent guilty of the violation of Section 489.129(1)(g)1., Florida Statutes, relating to Boca Concrete Pumping's December 6, 2000, $1,001.25 lien, alleged in Count II of the Amended Administrative Complaint, and taking the following disciplinary action against him for this violation: suspending his license for four years (with such suspension to run consecutively with his current suspension); (b) fining him $5,000.00; (c) requiring him to pay restitution in the amount of $1,001.25 to the Skieras; and (c) ordering him to reimburse the Department for all reasonable investigative and prosecutorial costs (excluding costs related to attorney time) incurred by the Department; and (3) dismissing all other charges in the Amended Administrative Complaint. DONE AND ENTERED this 8th day of May, 2007, in Tallahassee, Leon County, Florida. S STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of May, 2007.

Florida Laws (16) 1.01120.569120.5717.001206.20218.79455.2273458.331489.115489.119489.1195489.129489.140489.1425627.8405810.02
# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. ALVIN C. SMITH, 82-000705 (1982)
Division of Administrative Hearings, Florida Number: 82-000705 Latest Update: Jan. 31, 1983

Findings Of Fact Respondent is a certified general contractor holding license number CG C008351. Respondent obtained Osceola County Building Permits and agreed to help property owners construct improvements or additions to four motels located in Osceola County, Florida. (Testimony of Record, Popesco, Matay, Solms, respondent.) Specifically, on January 29, 1980, respondent pulled Osceola County Building Permit ("building permit") No. 364-80B to construct the Record Motel, an 11-unit motel owned by Frank B. Record. On March 17, 1981, respondent pulled building permit No. 694-81B to construct a five-unit addition to the Record Motel; on January 30, 1980, he pulled building permit No. 2613-80B to add eight units to the Lakeview Motel owned by Michael Popesco; on February 2, 1980, he pulled building permit No. 2996-81B to construct a 20-unit motel known as The Key Motel, owned by Reinhold Matay; on April 8, 1981, he pulled building permit No. 3087-81B to construct a second floor addition to The Key Motel; and on March 2, 1981, he pulled building permit No. 3038-81B to construct a 20-unit motel known as the Siesta Motel, owned by Herbert Solms. (Stipulation dated June 30, 1982.) II. Respondent had a similar working arrangement with each motel owner, none of whom were licensed contractors. As the general contractor, he pulled the necessary building permits. He would perform the carpentry work on each project. The owners actively supervised and participated in their building projects. After consulting with respondent, they solicited, selected, and awarded bids to electrical, masonry plumbing, paving, and drywall subcontractors. They paid subcontractors directly and supervised their work daily. Respondent, however, would inspect the job sites intermittently, usually on weekends, sometimes during the week. But he did not directly and actively supervise the subcontractors; some were even unaware that he was the general contractor for the job. (Testimony of Record, Popesco, Matay, Solms; P-3, P- 10.) No evidence was presented to establish that the owners, for compensation, constructed these improvements for others or for resale to others. All the buildings were constructed in a satisfactory manner. The buildings passed all inspections, and the owners are entirely satisfied. (Testimony of Record, Popesco, Matay, Solms, respondent.) The owners of the various motels did not act as "contractors" within the meaning of Section 489.105(3), Florida Statutes (1981).

Recommendation Based on the foregoing, it is RECOMMENDED: That the charges against respondent be dismissed. DONE and RECOMMENDED this 14th day of October, 1982, in Tallahassee, Leon County, Florida. R. L. CALEEN, JR., Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of October, 1982.

Florida Laws (7) 120.57489.103489.105489.113489.119489.127489.129