CITY OF BARTOW vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 78-001139RX (1978)
Division of Administrative Hearings, Florida Number: 78-001139RX Latest Update: Sep. 14, 1978

The Issue The issue presented for determination in this proceeding is whether the wasteload allocations set forth in respondent's interoffice memorandum dated September 8, 1977, constitute a rule subject to the procedural requirements of the Administrative Procedure Act, Chapter 120, Florida Statutes.

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following facts are found: The petitioner, a municipal corporation, applied to the respondent for renewal of its permit to operate a sewage treatment plant. The respondent gave notice of its intent to deny said application on the ground that petitioner had not met the wasteload allocations established for the upper part of the Peace River Basin. A petition for a hearing on this denial was filed by petitioner pursuant to the provisions of Florida Statutes, 120.57(1), and a hearing was originally scheduled for May 11, 1978. At the commencement of this hearing, it became apparent that petitioner was also alleging that the wasteload allocations set forth in an interoffice memorandum dated September 8, 1977, constituted a rule within the meaning of Chapter 120, Florida Statutes, and therefore must be adopted pursuant to the provisions of said chapter. The respondent not being prepared to meet this allegation and the petitioner not having filed a petition pursuant to the provisions of Section 120.56, the scheduled hearing was continued and petitioner was granted leave to file a petition pursuant to Section 120.56 challenging the validity of the wasteload allocations as an invalid rule. Petitioner properly filed its petition for an administrative determination of the validity of a rule and the two petitions were consolidated for hearing purposes. The "rule" being challenged herein contains revised wasteload allocations for four municipalities in Polk and Hardee Counties. These four include Bartow, Ft. Meade, Bowling Green and Wauchula, each of which discharges effluent into the Upper Peace River Basin. As noted above, these allocations are set forth in an interoffice memorandum dated September 8, 1977, and were not adopted pursuant to the rulemaking provisions of Chapter 120, Florida Statutes. Wasteload allocations are derived from mathematical calculations fed into a scientific model. They are based upon information pertaining to the treatment plant, the type of effluent, the physical, chemical and biological characteristics of the receiving waters and the number and nature of other discharges to the receiving waters. In developing said allocations, the respondent relies upon information received from the applicant, as well as existing water quality data from the Environmental Protection Agency, United States Geological data, local programs and university studies. The purpose of developing wasteload allocations is to determine the chemical effect of the discharge upon the receiving body of water and to determine whether a certain volume of effluent treated to a specified degree will depress water quality below the standard established for a particular class of water. Wasteload allocations are calculated by the respondent for each individual discharger to determine whether a reduction in water quality will occur. When an application for a discharge permit is made to respondent, allocations for several dischargers in close proximity affecting the same portion of a body of water may be calculated at the same time, as was done in the September 8th memorandum. However, the other individual allocations become effective and applicable only when those dischargers seek a permit from the respondent. At that time, the allocation is revisited and recalculated based upon the most recent, available information and data. The wasteload allocations have applicability only when a facility seeks a permit to discharge effluents into surfaced waters. In the State of Florida, there are approximately 1,300 domestic and municipal sewage treatment plants and 230 industrial dischargers. A uniform wasteload allocation for 1,530 dischargers would be impossible and meaningless because each has its own unique characteristics based upon the type and method of discharge and the nature of the receiving body of water. Accordingly, the wasteload allocations are established by respondent on a case by case basis in the permitting process. Approximately 1.6 million dollars in capital expenditures will be necessitated in order for petitioner to comply with the wasteload allocations established by the respondent. There would also be increases in operating and management costs for new capital improvements. Alternative methods of sewage treatment may be undertaken by the petitioner.

Florida Laws (6) 120.52120.54120.56120.57403.051403.061
# 2
SON-MAR SOUTH SANITATION, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 94-005488BID (1994)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Oct. 05, 1994 Number: 94-005488BID Latest Update: Jul. 05, 1995

Findings Of Fact On November 16, 1988, Industrial Waste Service, Inc. (IWS), obtained approval to provide garbage and trash collection services to the City of Pembroke Pines (City) when the City passed and adopted Resolution No. 1876 approving the assignment of the contract for such services between the City and Citywide Sanitation Company, Inc. (Citywide), to IWS. Citywide's contract was to expire June 30, 1993. On November 6, 1991, the city amended Chapter 112 of its Code and passed and adopted a solid waste franchise ordinance, called the "City Solid Waste Franchise Ordinance," Ordinance No. 975, effective November 6, 1991. The Ordinance provides in pertinent part: Sec. 112.39 FRANCHISE REQUIRED TO OPERATE; RESTRICTIONS ON OPERATING IN THE CITY; AWARD OF FRANCHISE It shall be unlawful to commence or engage in the business of collecting and disposing of solid waste originating in the city without a franchise issued by the franchising authority in accordance with the provisions of this subchapter. It shall be unlawful for any hauler operating in the city to dispose of solid waste collected in the city at any location other than to the Resource Recovery System transfer station or facilities designated in the plan of operation under the Solid Waste Disposal Agreement, as defined in section 94.22 of the code, the City's Flow Control Ordinance. (Underscore and strike through omitted) On February 13, 1992, the City and IWS entered into a "Solid Waste Collection & Disposal Agreement" (Agreement). The Agreement provides in pertinent part: 2. DEFINITIONS Contract Collection Area shall include all of the City of Pembroke Pines, Florida, as the boundaries of said City shall exist at all times during the life of this Contract. * * * 4. TERM & EFFECTIVE DATE The term of this Contract shall be for a five (5) year period beginning February 1. 1992 and termi- nating January 31, 1997. This Agreement shall become effective upon execution by the parties hereto. On April 1, 1992, the Agreement was amended, "First Amendment to Solid Waste Collection & Disposal," which provides in pertinent part. DEFINITIONS * * * Commercial Service shall mean the collection and disposal of Garbage, trash, Solid Waste and Processable Waste for all Business, Commercial, Industrial, hospital, school, governmental and quasi-governmental establishments, including the collection and disposal of Construction and Demolition Debris. * * * Processable Waste shall mean that portion of Waste Stream that is capable of being processed in the Corporation's resource recovery and compost facility, including but not limited to materials which are recyclable and all acceptable Waste other than Non- Processable Waste (as defined herein). * * * Solid Waste shall mean all waste accumulations consisting of garbage, residential/household trash, commercial/business trash and construction and demolition debris, including but limited to all materials which are recyclable. * * * CONTRACTOR'S RIGHTS (D) The City further grants to Contractor the exclusive right to service all Residential Curbside, Apartment, Condominium, Business, Industrial, and Commercial establishments that are certified for occupancy after February 1, 1992, provided, however, a certificate of occupancy issued as a result of remodeling with no change in ownership shall not require the owner to change service to the Contractor except for the Solid Waste (i.e. Construction Demolition and Debris) created thereby. * * * The City grants to the Contractor the exclusive right to provide Solid Waste collection and disposal services to any Residential Apartment, Business, Commercial or Industrial establishments for the following customers as of February 1, 1992: For CONTRACTORS's existing customers; and For customers that have a change in ownership after the City's approval of the Agreement; and For customers which received Solid Waste collection and disposal services in the City prior to the City's approval of the Agreement and whose contract for such services expires and is not renewed with the same provider in the future. (Underscore and strike through omitted) On November 4, 1992, the City passed and adopted an ordinance, Ordinance No. 1016, amending Chapter 94 of its Code providing for a new subchapter entitled "Garbage Collection" and providing new sections. The Ordinance provides in pertinent part: Sec. 94-10 Agreement with Private Collector. The City acting by and through its City Commission, and in accordance with the provisions of Section 112.37 through 112.41 of the Code, approved a Solid Waste Collection & Disposal Franchise Agreement dated January 15, 1992, as amended by the First Amendment dated April 1, 1992 ("Agreement") between the City and Industrial Waste Service Inc. ("Collector"). All providers of Solid Waste collection and disposal services other than Collector who provide such services within the City boundaries shall be referred to herein as "Haulers". All terms not otherwise defined in this Subchapter shall have the meaning ascribed thereto in the Agreement. The Agreement is specifically made a part hereof as Appendix A, and a copy of same will be maintained at the City Clerk's Office at City Hall. Pursuant to the Agreement the City has granted the Collector the following rights and obligations to provide Solid Waste collection and disposal services: * * * The exclusive right and obligation to provide solid waste collection and disposal services within the City boundaries, present and future, for all Residential Curbside, and all Apartment, Condominium, Business, Industrial and Commercial establishments that are certified for occupancy after February 1, 1992, and govern- mental establishments to the extent permitted by law, provided, however, that a certificate of occupancy issued as a result of remodeling with no change in ownership of the property shall not require the Customer to change to Collector except for construction/remodeling demolition and debris created thereby; and The exclusive right and obligation to provide solid waste collection and disposal services within the City boundaries for all construction or remodeling demolition and debris within the City; and As of February 1, 1992, the exclusive right and obligation to provide solid waste collection and disposal services within the City boundaries for; [sic] Collector's existing Customers; Customers/property owners in the City that have a change in ownership; and customers/property owners whose contract for solid waste collection and disposal services expires and is not renewed with the same provider. Sec. 94.14 Certain Acts Prohibited. * * * (C) It shall be a violation of this subchapter for any person, firm, corporation or other entity, other than Collector to collect and/or dispose of Solid Waste originating in the City except to the extent the same is specifically permitted by the terms of this subchapter. (Underscore and strike through omitted) By letter dated June 10, 1992, IWS notified South Florida State Hospital that it (IWS) was the exclusive contractor for solid waste collection and disposal. South Florida State Hospital (Hospital) is a state mental health treatment facility operated and administered by the Division of Health and Rehabilitative Services (HRS) pursuant to Chapter 394, Florida Statutes. The Hospital is located on state property and is situated within the city limits of the City of Pembroke Pines (City), Broward County, Florida. In December 1993, HRS published an Invitation To Bid (ITB) on Bid # 595-591 for waste disposal services at the Hospital. Browning Ferris Industries, IWS, and Southern Sanitation Service submitted bids. On December 8, 1993, a pre-bid conference was held which included an opportunity for questions and answers. At this conference, HRS pointed out, among other things, that the City had an exclusive contract with IWS for waste disposal services but it (HRS) was also obligated by Florida Statutes to ensure the bidding remained competitive and that all waste collected from the Hospital had to be deposited at land fill sights designated by the City. In or around January 1994, HRS notified the bidders of Bid # 595-591 that, due to the bid document being flawed, a contract would not be awarded. All the bidders filed protests but none raised the City's exclusive contract with IWS as an issue. Ultimately, the contract was awarded to IWS but for only a six-month period. In April 1994, HRS published another ITB on Bid # 595-594 for waste disposal services at the Hospital. In the section entitled "SECTION A. INTRODUCTION," the ITB provides in pertinent part: STATEMENT OF NEED [T]he department requires the services of a qualified waste disposal company to provide waste disposal services to maintain sanitary conditions essential to the health, safety and well being of residents and staff living and working at the hospital. STATEMENT OF PURPOSE Pursuant to Florida Statutes, Chapter 287, this Invitation to Bid is being issued by the State of Florida, Department of Health and Rehabilitative Services, South Florida State Hospital, to obtain the services of a suitably qualified provider to enter into a contract for the removal and disposal of garbage from the hospital campus, and related services; in keeping with hospital requirements and the waste flow control ordinance of the City of Pembroke Pines. In the section "SECTION B. ITB SPECIFICATIONS: MINIMUM DEPARTMENTAL REQUIREMENTS," the ITB provides in pertinent part: PROGRAMMATIC REQUIREMENTS Method of Service Delivery 13) The provider will dispose of waste collected from the hospital at disposal site(s) specified by the City of Pembroke Pines, in keeping with the city's waste flow control ordinance. * * * Other Special Requirements * * * 2) Bidders Eligibility Requirements The successful bidder, in order to contract with the department to provide the services requested by this Invitation to Bid, must have all licenses and/or permits in accordance with city and county ordinances, rules, regulations, and provisions. All licenses and/or permits must be obtained at provider's expense. All costs for tests and inspections shall be paid for by the provider. GENERAL INFORMATION * * * Acceptance of Bids [T]he department reserves the right to reject any or all bids or waive minor irregularities when to do so would be in the best interest of the State of Florida. Minor irregularities are those which will not have a significant adverse effect on overall competition, cost or performance. In the section entitled "SECTION E. BID EVALUATION CRITERIA AND BID TABULATION," the ITB provides in pertinent part: 1) Evaluation Committee An evaluation committee of at lest three (3) members will be established to select the lowest responsive and qualified bidder. * * * 3) Evaluation of Bids Following the bid opening, the committee will review bid packages, beginning with the lowest cost bid, for compliance with the ITB requirements. A Fatal Items Checklist (Appendix IX) will be used to evaluate all bid packages. All items on the checklist MUST be met in order for the proposal to be considered. Receipt of a "No" response for any item will result in automatic rejection of the bid. All references will be checked. Only bidders with a good record of satisfactory performance will be considered. The contract will be awarded to the lowest responsive and qualified bidder who meets all the criteria specified in this ITB. The section entitled "General Conditions" of the ITB Contractual Services Bidder Acknowledgment form provides in pertinent part: 7. AWARDS: As the best interest of the State may require, the right is reserved to make award(s) by individual service, group of services, all or none, or a combination thereof; to reject any and all bids or waive any minor irregularity or technicality in bids received. Bidders are cautioned to make no assumptions unless their bid has been evaluated as being responsive. In response to the ITB, HRS received bids from Browning Ferris Industries which had previously bid on Bid # 595-591, Coastal Carting, Ltd., IWS which had also previously bid on Bid #595-591, Son Mar South Sanitation, Inc. (SON MAR), and Southern Sanitation Service which had also previously bid on Bid # 595-591. SON MAR was the apparent lowest bidder with a bid of $72,200.48 for the first year, $79,420.52 for the second year, and $87.362.57 for the third year, totalling $238.983.57, and IWS was the apparent second lowest bidder with a bid of $106,739.84 for the first year, $112,734.46 for the second year, and $121,971.12 for the third year, totalling $341,445.42. Subsequently, IWS' bid was recalculated due to HRS discovering a calculation error by IWS. The recalculation was performed without a reconvening of the Evaluation Committee and resulted in IWS' bid being $113,579.84 for the first year, $119,814.46 for the second year, and $129,291.12 for the third year, totalling $362,685.42. The Evaluation Committee reviewed all the bids and evaluated them using, among other things, the Fatal Items Checklist. If one item in the checklist were not satisfied, a bid would be disqualified. Pertinent to this case, both SON MAR and IWS satisfied the Checklist and all other evaluation criteria used by the Committee. On May 12, 1994, the Bid Tabulation sheet was posted. HRS indicated its intent to award Bid # 595-594 contract to SON MAR as the apparent lowest and responsive bidder. At that time, HRS was aware that SON MAR had no licenses or permits issued by the City. The Evaluation Committee considered the absence of a license or permit as not material to awarding the bid 1/ and were aware that an awardee obtaining a license or permit would involve a simple process of the awardee completing an application for and paying a fee to the City. By letter dated May 20, 1994, HRS requested that the City advise it of any permits and/or licenses required by the City for an awardee to provide waste removal services to the Hospital. HRS did not receive a written response to its letter. Instead, the City orally advised HRS that it (the City) would issue SON MAR a special permit which would be issued upon SON MAR making application for an occupational license and paying a franchise fee. SON MAR was agreeable to complying with the City's terms and conditions. SON MAR dispatched one of its representatives to the City to obtain an application for the license. However, the City refused to provide SON MAR an application. By letter dated June 13, 1994, IWS filed its formal bid protest of Bid # 595-594 with HRS alleging, among other things, that SON MAR did not have a license from the City to provide waste removal services because it (IWS) had the exclusive waste removal contract with the City, that, without a license, SON MAR could not comply with the bid eligibility requirements and that, therefore, the bid should be awarded to it (IWS). On or about June 28, 1994, SON MAR notified the City that its refusal to issue it (SON MAR) an occupational license was unconstitutional per a U.S. Supreme Court case and requested immediate issuance of the license. SON MAR forwarded HRS a copy of this notification and request. By letter dated June 30, 1994, the City notified SON MAR that it would not issue it (SON MAR) a permit to provide waste removal services in the City, as such an action would violate the exclusive franchise agreement that it (the City) had with IWS. On or about June 30, 1994, HRS was aware that the City would not permit SON MAR to provide waste removal services in the City as it received a copy of the City's letter to SON MAR. On July 14, 1995, HRS and IWS settled the protest filed by IWS, without involving SON MAR in the negotiations. The terms of the settlement, which were communicated to SON MAR on July 15, 1995, were that IWS would dismiss its protest if, within ten days, 2/ SON MAR obtained a license/permit from the City, produced the license to HRS and otherwise remain qualified for the award and that, if SON MAR was unable to obtain a license from the City, HRS would declare SON MAR unqualified and declare IWS the lowest responsive and qualified bidder and award the bid to IWS. SON MAR was unable to obtain a license from the City. Moreover, the City refused to provide SON MAR with an application, remaining consistent with its letter of June 30, 1994, to SON MAR. As SON MAR was unable to obtain a license within the prescribed ten- day period, by letter dated July 29, 1994, HRS notified all bidders to Bid # 595-594 that it was declaring SON MAR unqualified and of its intent to award the bid to IWS, as the next lowest and qualified bidder. Further, HRS notified the bidders that the bids of IWS and another bidder were recalculated to correct a calculation error, which would not affect the order of the bids. By letter dated August 9, 1994, SON MAR notified HRS of its intent to file a formal protest. On or about August 24, 1994, SON MAR filed its formal protest. At no time material hereto, has SON MAR pursued any civil action to challenge the validity of the exclusive contract between the City and IWS or the constitutionality of the City's Ordinance.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Health and Rehabilitative Services enter a final order awarding Bid # 595-594 to Industrial Waste Service, Inc. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 28th day of March 1995. ERROL H. POWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of March 1995

Florida Laws (7) 112.41120.53120.57120.68284.30287.012287.057
# 3
SARASOTA COUNTY AND TOWN OF LONGBOAT KEY vs. BEKER PHOSPHATE CORPORATION AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 75-001336 (1975)
Division of Administrative Hearings, Florida Number: 75-001336 Latest Update: Sep. 07, 1976

The Issue Whether Beker Phosphate Corporation should be granted a hermit to construct an industrial waste water facility pursuant to chapter 403, Florida Statutes. By application, dated April 8, 1975, Beker Phosphate Corporation (hereinafter Beker) , sought a permit to construct an industrial waste water facility in Manatee County, Florida, from the Department of Pollution Control (now and hereinafter DER) . The application was received on April 11 and, after advising Beker that the application was incomplete a meeting was held on May 9th between DER and Beker representatives with the result that Beker filed a new application dated June 11, that was received by the DER in July. Further meetings were held in the fall of 1975 and additional in formation was received as to the application. On December 16, 1975, DER secretary. Jay W. Landers, Jr., issued a Notice Of Intent To Grant A Permit With Conditions. The conditions were unspecified in the letter of intent (Exhibit 1.) Subsequently, on December 23 and December 24, 1975, Sarasota County (hereinafter Sarasota) and the Town of Longboat Key (hereinafter Longboat Key), respectively, filed petitions with the DER alleging that their substantial interests would be adversely affected by approval of the permit application and setting forth in their petitions certain disputed questions of fact for determination. After a prehearing conference, Amended Petitions were filed by those parties to clarify and expand on such questions of fact and to resolve procedural matters. Additionally, during this period, George Browning, III, of Sarasota, Florida was granted status as an intervenor.

Findings Of Fact Beker proposes to construct a phosphate rock mine and beneficiation plant on a tract of approximately 11,000 acres in a predominately agricultural and ranching area of Manatee County about 10 miles from Myakka City, Florida. The mining will be performed by two dredges. One will mine overburden and return it to the mined-out area and the other will mine phosphate rock matrix which will be pumped to the beneficiation plant. The plant will consist essentially of two circuits. The first is a washer where the matrix pumped from the dredging operation is partially cleaned of clay and fine sand, and the coarser phosphate particles "pebbles" are separated as a product. The "fines" from the washing operation consist of small phosphate rock particles, sand, and clay. This mixture will be treated in the second section of the plant by "flotation" methods to recover the small phosphate rock particles as a product. During initial operation, the sand and clay will be stored in a temporary waste material storage area, but as the mining proceeds and the dredge pits open up, the sand and clay material will be pumped back to the dredge pits so that sand, and overburden will be mixed and redeposited to reclaim the land. Approximately 8 million gallons of fresh water per day will be drawn from the Floridian aquifer to be used in the flotation circuits. From the plant the water flows in two types of streams--one containing sand suspended in water and one containing clay suspended in water. Both streams flow into a settling pond surrounded by an earthen dam where sand and clay solids settle to the bottom. The clarified water is then decanted through six spillway structures into a hydraulic recirculation ditch outside the dam and flows back to the plant for re-use. The ponds and canals that make up the hydraulic circuit are planned to have sufficient capacity to contain rainwater falling on the site and pond system during the wet season when there are heavy rainfalls (approximately from May to September). Excess water will be decanted from the hydraulic recirculation ditch through a structure into a pipe and then discharged into Wingate Creek. The settling pond will occupy approximately 225 acres and its capacity will be about 8,458 acre- feet. The pond itself can be used to act as a reservoir and water can be built up in the pond during periods of high rainfall. It will not be necessary to release the water at any particular time. It can be released at will when the effluent contains a minimum of pollutant materials (Exhibit 1). Matrix is an unconsolidated mixture of phosphate pebbles and boulders of partly phosphatized limestone, quartz and clay. The washing operation removes unwanted oversized material and fine clays. The purpose of the flotation plant is to recover fine phosphate rock that might otherwise be lost. In the flotation process, flotation reagents, including sulfuric acid, number 2 fuel oil, tall oil, sodium hydroxide, and amines are used for treatment. The wastes are then moved to the settling pond where over a period of time the "slimes", (sands and clays) will settle to the bottom forming an impervious layer which will seal the pond. The settling process removes more than 90 percent of the contaminants from the influent. The coarser clay particles settle first and many of the fine particles settle in a process called "flocculation" by which electrical forces bring the particles together. However, some of the particles will not flocculate and remain suspended in the water. These extremely small particles constitute the total suspended solids that remain in the effluent when it is discharged from the settling area. They probably will not settle out entirely during their course from Wingate Creek into the Myaaka River and eventually to the Gulf of Mexico. However, even if it were assumed that such materials would settle somewhere between the point of discharge and Charlotte Harbor, over the entire 20 year proposed life of the mine they would form a deposit much less than 1/10th of an inch. Although it is technically possible to treat water to the degree that it would result in distilled water, realistic concepts of treatment establish that an additional settling or "polishing" pond for the proposed facility might not improve the quality of the wastewater finally discharged in state waters to any appreciable degree. Alternative proposals for the reduction of pollutants by additional processing, such as the intentional growth of water hyacinths in settling areas or use of chemical coagulants would result in creating other waste materials and thus be counterproductive (Testimony of Bromwell; Exhibit 1). The applicant's discharge of wastewater to Wingate Creek will average approximately 3.19 million gallons per day. However, since discharge will be effected primarily during periods of excessive rainfall, actual discharges can reach a maximum of about ten million gallons per day during this period. The effluent contained in such discharge will meet the test of at least 90 percent removal of organic and inorganic wastes specified by Rule 17-3.04(1), Florida Administrative Code, when measured by the influent into the settling pond and the effluent leaving that area. This treatment, however, will not produce an effluent equivalent to that produced by the "highest quality municipal waste treatment." The highest degree of treatment that has been reached by municipalities is "advanced waste treatment" as defined in Rule 17-3.04(2)(b), Florida Administrative Code. The water quality characteristics of the effluent will meet the standards of Rule 17-3.05 as to concentrations of those pollutants reasonably anticipated to be fond in the wastewater based on samples taken where the waters are discharged into Wingate Creek (Testimony of Gilgallon, Davis, Edwards, Heinzman, Bromwell, Bartow, Wellford, Exhibit 1). In preparing the application, no consideration was given to the need of meeting treatment standards for highest quality municipal waste treatment or advanced waste treatment. Neither did the recommending official of the DER, Mr. Edwards, then Regional Administrator for the Southwest Region, consider this standard because he had been advised by the DER legal staff that Rule 17-3.04(2) did not apply to Wingate Creek since it was not a tributary to one of the bodies of water listed in subparagraph (c) of the rule 17-3.04(2). This determination was based upon Resolution No. 74-83, September 17, 1974, of the Florida Pollution Control Board that was issued after legal challenges had been made to an interpretation by the Department of Pollution Control legal staff that Rule 17-3.04(2) required advanced wastewater treatment for industrial waste discharges. The Board, in its resolution, determined that since evidence had not been taken concerning treatment standards for industrial waste discharges at the time of adoption of the effluent standards for sanitary waste contained in Rule 17-3.04(2), the advanced wastewater treatment standards in the aforesaid rule would not be enforced against industrial dischargers pending full hearings on a new Rule to clearly express the Board's intent in this regard (Testimony of Gilgallon, Edwards; Exhibit 1). Special conditions that the Southwest Region, Department of Environmental Regulation, recommends should be attached to any issuance of a construction permit, other than standard conditions and those relating to other types of permits, are as follow: Approval by DER prior to the construction of any above grade phosphatic clay storage facility other than the initial settling pond. Removal efficiencies for oil and grease shall be a minimum of 90 percent and shall not exceed 14 milligrams per liter measured in the discharge effluent. Discharge effluent to Wingate Creek shall meet the water quality standards of Chapter 17-3.05(2) at the point of discharge prior to mixing with the receiving stream. Further treatment of the discharge will be required in the event compliance with proviso (c) above cannot be achieved or significant degradation of the receiving stream occurs as determined by the DER. In addition to required routine monitoring, a detailed analysis of the untreated and treated wastewater to be conducted once on representative samples during (1) month of July and (2) month of February. Such analyses shall, as a minimum, include all the parameters listed in 17-3:05(2). Applicants shall conduct an investigation into total retention possibilities of the effluent including, but not limited to, the following areas: recharge wells retention and storage of excess water during the "wet" season with subsequent reuse during the "dry" season for process and/or irrigation purposes. A report of these investigations shall be submitted prior to submission of operation permit application The location of monitoring wells shall be down gradient from the settling pond. Detailed proposal, subject to the DER approval, regarding exact location and number of wells to adequately ascertain the impact of seepage to be submitted no later than 90 days prior to commencement of operation. Bond to be posted for damages that may result from a clay settling area dam failure. Oral and written communications from the public were received at the hearing and included the following: Announcement by the County Attorney, Manatee County, that the county did not plan to appeal the DER Notice of Intent to Grant the permit (Statement of E.N. Fay, Jr.). The Division of Recreation and Parks, Department of Natural Resources, fears that the construction of the phosphate mine up-stream from the Myaaka diver State Park poses a serious potential threat to its aquatic habitat due to the possibility of a dam failure. It also fears that pollutants from the project will tend to settle as the river waters flow through the two lakes in the park. It therefore, opposes the construction until assurance can be given that proper safeguards have been taken to prevent such problems (Testimony of Alverez). The Longboat Key Garden Club believes that the project would involve too much water consumption and also that phosphate mining should be halted until further government studies are made to assure that the safety and health of the populace and the environment will not be endangered through polluted runoff and phosphate spills (Testimony of Monroe). The Save Our Bays Association in Manatee County has collected petitions from citizens in Manatee County requesting a referendum on a ballot this November for or against phosphate mining. The Association believes that such a vote should be taken before final decision is made on the subject. Its spokesman fears that if the quality and quantity of the drinking water is disrupted, it will interfere with continued tourist trade (Testimony of Howard Greer). The Palma Sola Parks Association opposes the Beker Application until there is greater assurance of environmentally safe mining (Testimony of Blankenship) A former physical and health education director is concerned about the fact that there has not been sufficient data collected on the effect of radioactive materials in runoff and waste. She believes there should be more research in these areas and asked that the public be protected from such hazards (Testimony of Mary Kay Greer). The Manasota-88 project for environmental qualities of 1968 and 1988 believes that issuance of the permit should be withheld until health implications can be determined concerning potential hazards to the Myakka and Manatee Rivers' watersheds (Exhibit 7). A former member of the Manatee County Planning Commission that approved the Beker application prior to action by the County Commission of Manatee County is in favor of the proposed project because Beker's plan to impound water will augment the water facilities of the county (Testimony of Reasoner). The City of Bradenton believes that since it is being required to meet advanced water treatment standards of discharge for sanitary sewage, Beker Phosphate Corporation should be required to meet similar standards (Testimony of Mayor A.K. Leach). A member of the Myakka City Civic Association who is an adjacent land owner to Beker Phosphate Corporation feels that the project is necessary in order to produce jobs for individuals in that area of the county (Testimony of Mizell). The U.S. Fish and Wildlife Service is concerned that proposed construction of two dams by the applicant will destroy approximately (4) acres of mangrove areas, three acres of pasture land and about 185 acres of bottom land or hardwood habitat. It recommends an alternative method of backup levies constructed around the primary settling bases on the applicant's land to contain any spills and prevent destruction of the streams and associated wetlands (Testimony of Johnston) The Conservation Council of Manatee County believes that Beker's unique mining and reclamation plan will help the farming industry and also create necessary water reserviors and recreation areas, and therefore endorses its proposal to mine in Manatee County (Testimony of Kent, Exhibit 14). Petitions were submitted at the hearing from approximately 3,000 individuals living in Manatee and Sarasota Counties opposing the issuance of the permit because they believe that phosphate mining is dangerous to the quality and supply of the water and endangers the health of the people (Composite Exhibit 9, Testimony of Humphrey).

Florida Laws (5) 120.57403.021403.031403.085403.087
# 4
JOHN W. FROST, II, AND TERRY P. FROST vs REPUBLIC SERVICES OF FLORIDA, L.P., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 09-006762 (2009)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Dec. 15, 2009 Number: 09-006762 Latest Update: Nov. 30, 2010

The Issue The issue is whether Respondent Department of Environmental Protection (DEP) may issue to Respondent Republic Services of Florida, L.P. (Republic), permits to construct and operate a Class III landfill, pursuant to Permit Numbers 266830-003-SC/01 and 266830-004-SO/01, as modified as set forth below.

Findings Of Fact Background On June 30, 2009, Republic filed with DEP an application for a permit to construct and operate a Class I landfill (Application). In response to DEP's request for additional information dated July 30, 2009 (RAI), Republic filed a response dated September 14, 2009 (RRAI), upon receipt of which, DEP deemed the Application to be complete. References to the Application typically include the Application, RRAI, and other materials, such as reports, plans, and drawings, that are part of the Application, as well as three subsequent modifications, which are detailed below. Republic revised several reports, plans, and drawings in the RRAI; references to these items, such as the Engineering Report and Operation Plan, are to the versions contained in the RRAI. On November 13, 2009, DEP filed its intent to issue construction permit #266830- 003-SC/01 (Construction Permit) and intent to issue operation permit #266830-004-SO/01 (Operation Permit; collectively, the Permit). Republic Services, Inc. and its affiliates constitute the second largest waste-management operator group in the United States. Their market capitalization is just over $11 billion. The capitalization of the affiliate formed to operate the subject landfill is doubtlessly less than $11 billion, as the record does not suggest that any significant part of the overall capitalization of Republic Services, Inc., and its affiliates would be at risk in the operation of the proposed landfill. Republic presently owns and operates a Class III landfill in the City of Bartow, Polk County, known as the Cedar Trail Landfill. The oldest part of this landfill is an unlined Class III landfill of 52.5 acres in the center of the property owned by Republic. Immediately west of this unlined landfill is a 30.7-acre lined Class III landfill, which comprises cells 1-4. The Cedar Trail Landfill is located at 2500 West State Road 60, about three miles west northwest of the intersection of State Road 60 and State Road 98, which marks the center of Bartow. The landfill is immediately west of E.F. Griffin Road. Petitioners Frost live on E.F. Griffin Road, about one mile north of the Cedar Trail Landfill. Petitioner Highland Lakes Estates Homeowner's Association serves a residential subdivision known as Highland Lakes Estates. Highland Lakes Estates occupies a notch at the southeast corner of Republic's property. Aerial photographs reveal the changing land use of the land on which Cedar Trail Landfill is situated. Fifty years ago, the land was vacant with indications of agricultural uses. At the site of the proposed landfill were mostly citrus groves on the west side and some rangeland or vacant land on the east side. Ten years later, a large area immediately northeast of the subject land reveals the effects of strip mining for phosphate. Three years later, in 1971, the mined area had greatly expanded to encompass all or nearly all of the subject site and much of the surrounding area, including the western half of what would become Highland Lakes Estates. By 1980, the pits had been refilled and active mining had ceased, and the streets had been constructed for what is now known as Highland Lakes Estates. By 1993, about three dozen homes had been built in this residential, large-lot subdivision. 9. The Cedar Trail Landfill was constructed in the early 1990s as an unlined construction and demolition debris landfill. Now designated an approved landfill for Class III waste, this facility accepts such waste as is defined by Florida Administrative Code Rule 62-701.200(14) (2010), which includes construction and demolition debris, yard trash, processed tires, asbestos, carpet, paper, glass, furniture (but not white goods), plastic, and other materials not expected to produce leachate that presents a risk to the public health or environment. A zoning/land use map reveals that the land for which the proposed landfill is proposed is designated "sewage/borrow pits/spray fields." Highland Lakes Estates occupies land that is designated single-family residential with a density of one dwelling unit on up to 2.49 acres. The Cedar Trail Landfill has been the subject of three recent environmental resource permits (ERPs). Appendix R to the Application is an individual ERP issued in April 2009, and Appendix R to the RRAI is a conceptual ERP issued in March 2005. The April 2009 ERP mentions that the entire stormwater project was conceptually approved by an ERP issued on September 10, 2008, but this ERP is not part of the record. In any event, these ERPs approve the construction of a comprehensive stormwater or surface water management system for the entire Republic property. In particular, the April 2009 ERP permits the construction of a borrow pit at the southeast corner of the Republic property and a modification of the perimeter ditch/wet retention system. The April 2009 ERP states that the permitted stormwater management system will provide total onsite retention for runoff from the 100-year, 24-hour storm. The April 2009 ERP requires 2.8 acres of compensation for 2.8 acres of encroachment in the 100-year floodplain. Specific Condition 14 prohibits excavation of the borrow pits to a clay confining layer or limestone bedrock layer. Specific Condition 20 prohibits the mixing of leachate with stormwater and provides that, if leachate enters stormwater, the stormwater becomes leachate. Presumably reflecting this permitting activity, Application Drawing 4, as revised in the RRAI, is the site plan, including the unlined Class III landfill, the four-cell lined Class III landfill immediately to the west of the unlined landfill, and the eight cells proposed to accept Class I waste. These eight cells are immediately south of the four cells of the lined Class III landfill. The two northernmost of these eight cells abut, on their east boundary, the unlined Class III landfill. The remaining six cells abut, on their east boundary, an 800-foot wide borrow pit, which lies between these cells and Highland Lakes Estates. Immediately north of Highland Lake Estates is a second borrow pit, and west of this borrow pit is the unlined Class III landfill. The other major feature on the site plan is a third borrow pit running, from west to east, along the north border of the lined Class III cells, the unlined Class III landfill, and the second borrow pit. Bearing no signs of ambitious reclamation activity, the backfilled mining cuts host large water storage areas and, as described in the application for the March 2005 ERP, wetlands of "very poor quality." The backfilled soils are best described as complex surficial soils, consisting mostly of fine sands with varying amounts of organics, silts, and clays. Geotechnical investigations of the Cedar Trail Landfill suggest that mining depths, although variable, probably averaged 40 feet. Petitioners and Intervenor are substantially affected by the Permit and the construction and operation of the proposed landfill, which will stand nearly 200 feet above grade and will be the focus of substantial activity six days per week during its years of operation. Like Petitioners, Intervenor owns land in the immediate vicinity of the Cedar Trail Landfill, which is in the jurisdiction of Intervenor, and Intervenor's various municipal operations are much affected by whether the proposed Class I landfill is permitted. Among other things, Intervenor has agreed to accept untreated leachate from the proposed landfill. Petitioners Frost built their home in 1980 or 1981. During the hours of operation of the existing landfill, Petitioners Frost constantly hear the beeping noise of heavy- duty equipment, presumably a safety device when the equipment is moved. Over a dozen lots in Highland Lakes Estates abut the property line of the Cedar Trail Landfill, and the closest residence is about 1000 feet from the nearest proposed Class I cell. At present, the existing landfill subjects the Highland Lakes Estates to constant noise during operating hours and a coating of dust inside their homes. Several residents of Highland Lakes Estates testified. Hard-working people, some of whom are now retired, these residents decided to purchase homes in Highland Lakes Estates because it was a sunny, healthy place to live. Over time, most of these residents, by varying degrees, have come to accept the fact of the Class III operations at Cedar Trail Landfill, but they object to the substantial intensification of land use that will result from a regional Class I landfill. One resident testified that she finds in her pool dirt that has escaped from the existing landfill, and she has become concerned about her grandchildren coming over to swim. Another resident testified that he only began closing his windows five or six years ago when the noise levels at the existing landfill increased; he eventually had to install a window air- conditioner. The same resident testified that the green herons and snowy egrets that he used to see around his house have not returned for five years, and his wife, who has health problems, including respiratory distress, would suffer from the expanded landfill operations. Application, RRAI, and Permit, Including Modifications The Permit incorporates the Application, including the RRAI, Engineering Report, Operation Plan, and drawings. Thus, all of the documents are part of the Permit. In the Application, Republic proposes to convert cells 5-8, which are not yet constructed, from a Class III to a Class I landfill and add four new cells adjacent to the unused cells. The unfilled portion of Cells 1-4 would continue to receive only Class III waste. Pursuant to Florida Administrative Code Rule 62-701.200(13) (2010), Class I waste is all solid waste, other than hazardous waste, that is not otherwise prohibited by rule. The Application states that the proposed landfill will serve communities within 100 miles. The service area of this regional landfill will thus extend in central Florida from Marion to Osceola counties, along the Gulf Coast from Pasco to Lee counties, and along the Atlantic Coast from Volusia to Martin counties. As stated in the Application, this service area is populated by 9.7 million persons, who would daily account for 3000 tons of waste at the Cedar Trail Landfill. Initially, according to the Engineering Report, the proposed landfill will receive 1600 tons per day of Class I waste, but, once the existing Class III cells are filled, the proposed landfill will receive 1600 tons per day of Class I waste plus the 1400 tons per day of the Class III waste that is currently going into the existing landfill. As revised by the RRAI, the life expectancy of the proposed landfill is seven years. The Application states that Republic will employ an attendant, a trained operator, and 3-5 spotters at the landfill. The Application reports that the landfill would operate Monday through Saturday from 7:00 a.m. to 6:00 p.m. and that the working face would be covered daily. The Application reports that Republic would install seven new detection wells and use 17 existing wells for monitoring groundwater and would use two existing staff gauges for monitoring surface water, evidently at a single location, as discussed in the next paragraph. 23. Application Appendix V is the Water Monitoring Plan. Appendix V states that surface water will be monitored every time that the stormwater pond for the leachate storage area discharges offsite, but not more frequently than weekly. Application Drawing 4, as revised in the RRAI, shows that the sole surface water monitoring location is close to the leachate storage tanks, which are described below. 23. Appendix V also requires leachate monitoring, "at least annually," for five field parameters--specific conductivity, pH, dissolved oxygen, colors, and sheens; eight laboratory parameters--including chloride, mercury, and total dissolved solids; and the parameters listed in 40 CFS Part 258, Appendix II, which includes a comprehensive list of volatile organic compounds; persistent organic pollutants, including 2,3,7,8-TCDD (a major dioxin) and Dibenzofuran; and metals, including lead and chromium. Fourteen days prior to all sampling events, Republic is required to notify DEP, so that it may obtain split samples for its own analysis. Republic is required to report the results of the groundwater monitoring quarterly and to analyze the groundwater data in a technical report filed with DEP every two years. Appendix V also requires monitoring for odors and combustible gases, mostly methane. Republic will monitor combustible gas quarterly at various ambient locations, such as the office buildings and to monitor combustible gas quarterly in the soil down to the seasonal high water table. The purpose of this monitoring is to determine combustible gas concentrations and, if they exceed 25%, take "all necessary steps to ensure protection of human health." Some confusion in the Application arises as to the issue of whether the Cedar Trails Landfill will be subject to, or voluntarily implement, the more elaborate provisions applicable to a landfill covered under Title V of the federal Clean Air Act, as amended in 1990. Regulated emissions for a new source might include particulate matter, sulphur dioxide, nitrogen oxides, volatile organic compounds (VOCs), and specified hazardous air pollutants. Appendix V states that the landfill will become a Title V landfill once permitted to receive Class I waste, and, at that time, it will be subject to a "more comprehensive system of landfill gas collection and monitoring." Appendix V assures that these items "will be addressed in separate documentation from this monitoring plan"--and, apparently, separate from the present record. By contrast, the Operation Plan concedes only that, based on the nature of Class I waste and the design capacity of the proposed landfill, Cedar Trail Landfill "may" become a Title V facility. The Operation Plan states: "If the regulatory thresholds at [Cedar Trail Landfill] are met [under Title V] requiring an active gas collection and control system (GCCS), [Cedar Trail Landfill] will submit as required the GCCS design plans for approval and install an active gas extraction system within the regulatory timeframes specified by Title 40, Code of Federal Regulations, Part 60, Subpart WWW." More specific provisions in the Operation Plan identify best management practices to prevent objectionable odors. Four practices are identified, including an "active gas collection and extraction system." On the DEP form application, which is a cover sheet to the more elaborate application materials, Republic checked boxes indicating that the landfill would use active gas controls with gas flaring and gas recovery, which is probably what is meant by an "active gas collection and extraction system." The Application provides that the landfill liner would be double composite; the leachate collections system would consist of collection pipes, geonets, and a sand layer; the leachate would be stored in tanks; some of the leachate would be recirculated as spray on the working face; and the remainder of the leachate would be stored onsite and periodically transferred to a wastewater treatment center for treatment. The Engineering Report states that the waste disposal footprint will not be located where geological formations or other subsurface features will not provide support for the waste. The Engineering Report identifies appendices addressing the slope-stability analysis and foundation analysis and relies on a March 12, 1997, report by Ardaman & Associates, Inc. (Ardaman Report), January 23, 2004, report by Golder Associates, Inc. (Golder Report), and June 26, 2009, report by Hanecki Consulting Engineers, Inc. (Hanecki Report). These items are discussed in greater detail below in connection with the sinkhole issue. The Engineering Report assures that the waste disposal footprint will not be within 500 feet of an existing or approved potable water well, nor will it be within 1000 feet of an existing or approved potable water well serving a community water supply. The Engineering Report adds that the minimum horizontal distance between waste deposits and the property line is 100 feet. The Engineering Report assures that the landfill footprint will not be in a dewatered pit, as the installation elevations are at least 2-3 feet higher than the seasonal high water table. The Engineering Report acknowledges that a small part of the eastern end of the four southernmost cells lies within the 100-year floodplain, as depicted by the Flood Insurance Rate Map effective December 29, 2000, and as shown in Application Appendix A, Drawing 1. Claiming that the relevant map was not revised in 2000, the Engineering Report asserts that the last update to the FIRM map was in 1975, and the depicted floodplain was filled during the mine reclamation process. The Engineering Report notes that the floodplain concerns were addressed in the April 2009 ERP. 34. The Engineering Report discloses two enforcement actions against Republic at the Cedar Trail Landfill. In a letter dated October 19, 2001, DEP warned Republic about noncompliant items at the site, and, in a notice of noncompliance dated January 30, 2006, DEP warned Republic not to use a new cell prior to construction certification of the cell's stormwater system. Both matters were reportedly resolved, and Republic has not been the subject of other enforcement actions for the Cedar Trails Landfill. At DEP's urging, the RRAI elaborates on enforcement actions against Republic or, evidently, Republic affiliates at a variety of Florida facilities, not just landfills. The additional information reveals that DEP imposed a fine of $61,300 for the October 2001 violations, which included disposing of unacceptable waste, storing an excessive number of tires and exceeding groundwater standards without notifying DEP, and a fine of $1000 for the January 2006 notice of noncompliance. The other enforcement actions against Republic or affiliates concerning landfills involved consent orders about the Nine Mile Road Landfill (Seaboard Waste): in February 2003, DEP imposed a fine of $13,000 in settlement of charges that employees were not removing all unacceptable waste from the site and, in November 2005, DEP imposed a $285 fine for a failure to submit required stormwater monitoring reports. There were many other enforcement actions, generally resulting in modest fines, but they involved hauling facilities, transfer stations, and materials recovery facilities, not landfills. The Engineering Report states that the proposed landfill is within six miles of, but greater than 10,000 feet from, the Bartow Municipal Airport. Airport safety is addressed in more detail below. The Engineering Report describes in detail the double composite liner system, which uses materials whose physical, chemical, and mechanical properties prevent failure due to contact with Class I waste and leachate, climactic conditions, installation stress, and other applied stresses and hydraulic pressures. The Engineering Report performs no contingency sinkhole analysis. The report does not suggest that the liner system could withstand the stresses and pressures resulting from any size sinkhole, so the necessary inference is that the liner will fail if any sinkhole forms directly beneath it. The Engineering Report states that waste placement will remain within the lined containment berm. The Engineering Report describes in detail the double composite liner system for use at the proposed landfill. The primary liner system and secondary liner system each comprises three layers with the top layer consisting of a composite drainage net, the middle layer consisting of a high-density polyethylene geomembrane with a minimum average thickness of 60 ml, and the bottom layer consisting of a geosynthetic clay liner with a maximum hydraulic conductivity of 5 x 10-9 cm/second. The Engineering Report describes in detail the leachate collection and removal system, which, sitting atop the primary liner, includes a 24-inch thick sand drainage layer with a minimum hydraulic conductivity of 1 x 10-3 cm/second, a composite drainage net, and a single perforated 8-inch diameter lateral pipe in each cell. The collection lateral pipes will gravity drain to the east to a header pipe that gravity drains to the primary leachate collection pump stations--one station for the four converted cells and one station for the four new cells. A smaller leachate collection and removal system will handle the leachate that penetrates to the leak detection layer by routing it to a secondary leachate collection pump station. Based on calculations derived from the HELP groundwater model, the leachate collection and removal system is designed to prevent leachate head from exceeding the thickness of the composite drainage net (about 1 cm) over the secondary geomembrane and from exceeding one foot over the primary geomembrane. According to the Engineering Report, flow meters will be installed at each of the pump stations to allow daily readings of the amount of leachate being pumped. At one foot of head over the primary liner, the Engineering Report expects just over three gallons per day collected at each secondary leachate collection pump station--significantly less than the leakage rate typical of a double liner system without a geosynthetic clay liner beneath the primary liner. However, the Engineering Report provides a standard action leakage rate of 100 gallons/acre/day, meaning that Republic is required to report to DEP liner leakage only when this leakage rate is attained. The pump stations will transmit the leachate to one of two above-ground, 150,000-gallon storage tanks. From these tanks, most of the leachate will be transported to an offsite location for treatment. However, up to 12,000 gallons per day of the untreated leachate will be recirculated to be sprayed on the working faces of the landfill. This is to control dust and possibly to assist with the degradation of the waste. The Engineering Report states that the Cedar Trail Landfill implements a facility-wide water quality monitoring plan. Upon completion of the pump stations for the eight cells that are the subject of the Application, Republic will expand its leachate sampling program to include annual sampling of the leachate collected in the primary and secondary leachate collection pump stations. The groundwater monitoring wells would be installed as closely as possible to the outer edge of the roadway that, with a stormwater ditch, will run the perimeter of the proposed Class I landfill. In the revised Engineering Report contained in the RRAI, Republic proposes a surface water discharge point in the stormwater pond located near the leachate storage tanks. The Engineering Report adds that Republic will continue to comply with the following prohibitions: No waste will be knowingly burned on site; Hazardous waste will not knowingly be accepted; PCB contaminated waste will not knowingly be accepted; Untreated biomedical waste will not knowingly be accepted. Please note that treated biomedical waste may be accepted at [Cedar Trail Landfill]'s Class I Landfill provided that the waste containers are marked "Treated Biomedical Waste.;" No waste disposal at the proposed Class I Landfill will occur within 3,000 feet of a Class I surface water body; [Cedar Trails Landfill] will not knowingly accept liquid waste within containers, excluding leachate and gas condensate derived from solid waste disposal operations. [Cedar Trails Landfill] will comply with the requirements of Rule 62- 701.300(10), FAC regarding the handling of liquid wastes; Neither oily waste nor commingled oily waste will knowingly be accepted; and Lead-acid batteries, used oil, white goods, and whole-waste tires will not knowingly be disposed of in the Class I waste disposal system. The Joint Stipulation to Permit Modification, identified above, adds four items to this list of operational prohibitions: i. Garbage will not be knowingly accepted; Household Waste, except waste from residential sources generated as Class III waste, will not be knowingly accepted; Animal carcasses will not be knowingly accepted; and Aluminum dross will not be knowingly accepted. Capitalized terms are generally defined in the Florida Administrative Code. Florida Administrative Code Rule 62-701.200(39) defines "Garbage" as " all kitchen and table food waste, and animal or vegetative waste that is attendant with or results from the storage, preparation, cooking, or handling of food materials." Application Appendix H is the Operation Plan, which also identifies the types of wastes to be permitted at the proposed landfill. Section 3(b) of the Operation Plan authorizes the proposed landfill to accept: Commercial waste Ash residue Incinerator by-pass waste Construction and demolition debris, including from a residence Treated biomedical waste Agricultural waste Industrial waste Yard trash, including from a residence Sewage sludge Industrial sludge Water/air treatment sludges Waste tires De minimis amounts of non-hazardous waste from incidental residential sources Section 5 of the Operation Plan provides, in relevant part: [Cedar Trail Landfill] will accept waste included in any of the waste categories identified under Section 3(b) of this Operation Plan[, but] will . . . NOT knowingly accept any hazardous waste, untreated biomedical waste, liquid waste (including paint), explosive waste, toxic waste, or radioactive waste for disposal at the [Cedar Trail Landfill.] Unacceptable types of refuse are listed below and will not be knowingly accepted for disposal. --Hazardous waste --Explosive waste --Radioactive waste --Drums that have not been opened and Emptied --Refrigerators, freezers, air Conditioners (white goods) --Any toxic or hazardous materials, i.e. batteries, solvents, oil, etc. --Automobiles or parts that contain fuel, lubricants, or coolants --Untreated Biomedical waste The original Application prohibited the acceptance of septic tank pumpage, but the application form accompanying the original Application indicated that the proposed landfill would accept industrial sludge and domestic sludge. After modification by the RRAI, the prohibition against accepting septic tank pumpage was deleted, and the Operating Plan added, among acceptable wastes, sewage sludge, industrial sludge, and water- and air-treatment sludge. Florida Administrative Code Rule 62-701.200(101) (2001) defines "sludge" to include solid waste pollution control residual from an industrial or domestic wastewater treatment plant, water supply treatment plant, air pollution control facility, septic tank, grease trap, portable toilet, or other source generating a waste with similar characteristics. Florida Administrative Code 62-701.200(64) (2001) defines "liquid waste" as any waste with free liquids, according to the "Paint Filler Liquids Test." As modified by the Joint Stipulation to Permit Modification, Section 5 of the Operation Plan was amended to add the following items to unacceptable types of refuse that will not be knowingly accepted for disposal: --Garbage --Household Waste, except waste from residential sources generated as Class III waste --Animal carcasses --Aluminum dross At the hearing, Republic and DEP agreed to an additional condition to the Operation Plan that unacceptable waste would include Garbage contained in commercial, industrial or agricultural waste. According to the Operation Plan, the initial waste screening occurs at the gate house where the attendant interviews the driver and inspects the incoming waste load. If the attendant sees more than a negligible amount of unauthorized wastes, he will reject the load and will contact the hauler to identify the source of the waste. Additionally, Republic will notify DEP if anyone tries to dispose of hazardous waste at the proposed landfill. As modified by the Joint Stipulation to Permit Modification, the Operation Plan was amended to provide a new paragraph between the paragraph addressing the initial waste screening at the gate house and, as discussed below, the second screening at the working face. The new paragraph provides: Any malodorous waste will be covered with mulch and/or additional soil or other approved cover materials to control odors promptly, within one (1) hour from the time of unloading, except in the event of exigent circumstances, such as extreme weather. Cedar Trail Landfill will promptly cover any sludge deposited on the landfill working face within one (1) hour from the time of the unloading, except in the event of exigent circumstances, such as extreme weather. At the hearing, Republic and DEP agreed to an additional condition to the Operation Plan, which would prohibit Republic from accepting malodorous waste or sludge that, due to exigent circumstances, it would not be able to cover within one hour from the time of unloading. If the load passes the initial waste screening, it will proceed to the working face of the landfill, according to the Operation Plan. At least one spotter will be stationed at the working face at all times that the landfill receives waste. Her job will be to detect unauthorized wastes. Republic is to assure that it has a sufficient number of spotters to find and remove unauthorized waste prior to compaction. The Operation Plan allows the spotter to work from ground level or the cab of a compactor. If the operator of a piece of heavy equipment is trained as a spotter, she may also serve as a spotter. During periods of higher waste traffic, the equipment operator will, according to the Operation Plan, "likely" need the assistance of another operator or spotter to screen the higher waste volumes. When finding unauthorized wastes in manageable volumes, the spotter or operator will remove these wastes by hand and place them into nearby containers for removal to an appropriate facility. The third waste screen occurs as the equipment operator spreads the waste, pursuant to the Operation Plan. The equipment operator is required to place any unacceptable observed wastes into containers, which will be located "within the lined area." These wastes will also be removed to an appropriate facility. In the RAI, DEP questioned the proximity of the containers to the working face, as the lined area consists of 72 acres, but, in the RRAI, Republic ignored the comment, restating only that the containers would not be located outside the lined area. The Operation Plan specifies a filling sequence. Republic will assure that the first layer of waste placed above the liner in each cell will be a minimum of four feet in compacted thickness and will be free of rigid objects that could damage the liner or leachate collection and removal system. Republic will maintain the working face to minimize the amount of exposed waste and initial cover necessary at the end of each day. The filling sequence will proceed until the permitted final grade elevations have been reached, less three feet for the final cover. The Operation Plan states that the initial cover at the Class I landfill will consist of a six-inch layer of soil that is transferred from onsite borrow pits or offsite sources. This soil will be compacted and placed on top of the waste by the end of each work day. At Republic's option, subject to DEP's approval, it may use a spray-on or tarpaulin cover, instead of a soil cover. The Operation Plan requires Republic to apply at least one foot of intermediate cover within seven days of cell completion, if additional waste will not be deposited within 180 days of cell completion. Republic may remove all or part of this intermediate cover before placing additional waste or the final cover. Through the placement of initial, daily, and intermediate cover, Republic will minimize the occurrence of moisture infiltration, fires, odors, blowing litter, and animals and other disease vectors. 59. The Operation Plan requires Republic to control litter primarily by daily waste compaction and cover. However, at least daily, if needed, employees will collect litter along the entrance and access roads and around the working face. Complaints about litter must be logged. In addition to the inspections detailed above, the Operation Plan establishes a random load-checking program to detect unauthorized wastes. Each week, Republic employees will examine at least three random loads of solid waste by requiring drivers to discharge their loads at a designated location within the landfill where the employees may undertake a detailed inspection. All random inspections will be logged. Notwithstanding the daily limit of 12,000 gallons per day, the Operation Plan prohibits Republic from spraying leachate during rain events. To apply the recirculated leachate, the lead operator will drive the leachate tanker truck on the working face, so that it can spray leachate over waste as it is being compacted, but after it has been screened by spotters. The spraying will be done to avoid causing leachate to pond atop the waste and will not be done within 50 feet of an outside slope. No restrictions apply to wind conditions. The Operation Plan states that, if the annual sampling of leachate water quality at the two pump stations reveals a contaminant in excess of the permissible limits listed in 40 CFR Part 261.24, Republic will start monthly sampling and notify DEP in writing. Also, the Cedar Trail Landfill will maintain a recording rain gauge. The Operation Plan requires Republic employees to conduct daily surveys for objectionable odors and take immediate corrective action, if odors are found at the property line. As modified by the Joint Stipulation to Permit Modification, this portion of the Operation Plan was amended to add two odor- remediation actions and another form of odor inspection. The two additional actions to prevent odors are to 1) provide additional cover using mulch, additional soil, or other approved cover material and 2) use odor masking or neutralizing agents. The new inspection provision states: Internal inspection will be performed on a weekly basis by a properly trained odor ranger or equivalently trained person. Such individual will tour the facility, property boundary, and the subdivision of Highland Lakes Estates . . . to identify any odors leaving the Landfill's property boundaries. The results of each weekly inspection will be document, and any odors identified will be mitigated. Another new provision from the Joint Stipulation for Permit Modification applies to the handling of sludge. As amended, the Operation Plan states: When accepting sludge from a new source or distributor, [Republic] will obtain information regarding the characteristics and constituents of the sludge, including a description of the industrial process or circumstances that resulted in the generation of the sludge. Upon delivery of the sludge, [Republic] will mix lime, sodium hydroxide, or any other suitable agents to eliminate objectionable odors as required during disposal of the sludge before the material is covered. Furthermore, [Republic] will obtain advance notice from contributors prior to delivery of any sludge and shall promptly cover any sludge unloaded on the landfill working face within one (1) hour from the time of unloading, except in the event of exigent circumstances, such as severe weather. [Republic] shall use its best efforts to avoid accepting or disposing of sludge on Saturdays, Sundays, or public holidays. Additionally, with respect to sludge received from wastewater treatment facilities only, such sludge shall not exceed the lesser of (1) twenty percent (20%) of the total volume of waste disposed in the landfill on an average monthly basis, determined annually on the prior calendar year, or (2) two-hundred (200) tons per day, averaged over the prior 12-month calendar year. Republic is required to monitor combustible gases quarterly and transmit the results to DEP, according to the Operation Plan. If Republic detects methane above the limits specified in Florida Administrative Code Rule 62-701.530 (2010), Republic must submit a gas remediation plan to DEP within seven days. The Operating Plan indicates that the separation of the waste from the groundwater prevents the saturation of the waste and, thus, the generation of odor. Sloping and compacting will promote stormwater runoff, again to discourage the generation of odor. The Construction Permit authorizes construction of the proposed landfill in accordance with the "rules[,] . . . reports, plans and other information" submitted by Republic "(unless otherwise specified)." This parenthetical reference provides that the provisions of the Construction Permit control over any contrary provisions in the other documents that are part of the Permit due to incorporation by reference. In addition to the original Application, RRAI, and drawings, the Construction Permit also incorporates Florida Administrative Code Chapter 62-701 (2001). The Construction Permit states that Republic may not violate the prohibitions set forth in Florida Administrative Code Rule 62-701.300, which is discussed in the Conclusions of Law. Construction Permit Specific Condition A.9.a requires notification to DEP of the discovery of limestone during excavation or discovery. Specific Condition A.9.b requires notification to DEP of any surface depressions or other indications of sinkhole activity onsite or within 500 feet of the site. Specific Condition A.9.c prohibits open burning. Construction Permit Specific Condition C.1.b prohibits the discharge of leachate, during construction or operation, to soils, surface water, or groundwater outside the liner and leachate management system. Specific Condition C.4 prohibits the acceptance of hazardous waste and does not condition this prohibition on Republic's knowledge that the waste is a hazardous waste. Specific Condition C.5 requires Republic to "control . . . odors and fugitive particulates (dust)" and "minimize the creation of nuisance conditions on adjoining property." "Nuisance conditions" include "complaints confirmed by [DEP] personnel upon site inspection." Specific Condition C.5 orders Republic to "take immediate corrective action to abate the nuisance" and to "control disease vectors so as to protect the public health and welfare." Construction Permit Specific Condition C.6.b requires immediate notice to DEP of any sinkholes or other subsurface instability. Specific Condition C.8 requires Republic to manage leachate in accordance with the Operating Permit and Florida Administrative Code Rule 62-700.500(8). The Operating Permit incorporates the same materials that are incorporated into the Construction Permit, again "(unless otherwise specified)." Like the Construction Permit, the Operating Permit incorporates Florida Administrative Code Chapter 62-701 (2001) and requires immediate notice to DEP in the event of a sinkhole or subsurface instability. The Operating Permit specifies that the action leakage rate is 100 gallons per acre per day and the leachate recirculation rate is 12,000 gallons per day. As modified by the Joint Stipulation to Permit Modification, Operating Permit Specific Condition A.1.b states: This Facility is not authorized to accept Garbage; untreated Biomedical Waste; animal carcasses; liquids and non-liquid PCB containing materials or wastes with a PCB concentration greater than or equal to 50 parts per million; Liquid Waste; and aluminum dross. Additionally, this facility is not authorized to accept Household Waste, except waste from residential sources generated as Class III waste. Class III waste means yard trash, construction and demolition debris, processed tires, asbestos, carpet, cardboard, paper, glass, plastic, furniture other than appliances, or other materials approved by [DEP] that are not expected to produce leachate which are a threat to public health or the environment as defined in Rule 62-701.200(14), F.A.C. Based on this authorization to allow certain wastes as described above from residential sources, and since the landfill design, including liner and leachate collection systems, meets the requirements of Chapter 62-701, F.A.C., for Class I landfills, the facility will be entitled to [the] household hazardous waste exemption pursuant to 40 C.F.R. 261.4(b)(1). Specific Condition A.9.c prohibits open burning. Operating Permit Specific Condition C.1.b prohibits the discharge of leachate to soils, surface water, or groundwater outside the liner. Specific Condition C.1.c prohibits the discharge of "residual contaminants," such as gasoline, oil, paint, antifreeze, and polychlorinated biphenyls (PCBs), onto the ground or into surface water or groundwater. Operating Permit Specific Condition C.1.k(1) provides that authorized waste types are those listed in Section 3(b) of the Operations Plan, and unacceptable wastes shall be removed from the site as described in Sections 3(a) and 7. As modified by the Joint Stipulation to Permit Modification, Operating Permit Specific Condition C.1.k(1) provides: "Waste types authorized for management at this site are those listed in Section 3(b) of the Operations [sic] Plan. Unacceptable wastes are those listed in Section 5 [of the Operation Plan] " Operating Permit Specific Condition C.1.k(2) requires the use of a sufficient number of spotters to remove unacceptable wastes, but allows Republic to direct its equipment operators to serve as spotters from the equipment. This condition allows DEP to require that spotters work from the ground, if DEP determines that spotting from equipment is not effective. Specific Condition C.1.k(3) requires Republic to remove unacceptable wastes immediately and not to unload additional wastes in the immediate vicinity until placing unacceptable wastes in the designated waste containers" "near the working face" and within the lined landfill area. Operating Permit Specific Condition C.1.l(2) requires Republic to inspect on each operating day the property boundary for objectionable odors and, if any are detected, abate them in accordance with Specific Condition C.5. Specific Condition C.5.a requires Republic to control odors, disease vectors (insects and rodents), and fugitive particles (dust and smoke) to protect the public health and welfare. Control is defined as "minimiz[ing]" the creation of nuisance conditions on adjoining property. Odors confirmed by DEP personnel are a nuisance condition, and Republic must take immediate corrective action to "abate" the nuisance. Specific Condition C.5.b provides that, if odor control measures do not "sufficiently abate" objectionable odors within 30 days, Republic will submit an odor remediation plan to DEP for approval. Operating Permit Specific Condition C.8.e requires monthly reports to DEP of leachate quantities. Specific Condition C.8.h(1) prohibits recirculation of leachate at rates that result in seepage that may discharge outside the lined area. Leachate may not be sprayed when the application area is saturated or during a rainfall event. There is no prohibition against spraying during windy conditions. Operating Permit Specific Condition E details the extensive water quality monitoring requirements. However, Specific Condition E.9.b requires only annual testing of the five field parameters, eight laboratory parameters, and the comprehensive list of Appendix II parameters set forth in 40 CFR Part 258, all of which are identified below. Specific Condition E.9.c provides that, if a contaminant listed in 40 CFR 261.24 exceeds the level listed therein, Republic will notify DEP and take monthly leachate samples until no exceedances are detected for three consecutive months. Operating Permit Specific Condition F.1.a states: "This solid waste permit will meet the statutory requirement to obtain an air construction permit before . . . constructing a source of air pollution, except for those landfills that are subject to the prevention of significant deterioration (PSD) requirements of Chapter 62-212, F.A.C." Such facilities are required to obtain an air construction permit from the Bureau of Air Regulations prior to construction. Specific Condition F.1.b requires Republic to comply with Title V of 40 CFR 60, Subparts WWW and CC. This section notes that Title V permit applications must be submitted to the District Air Program Administrator or County Air Program Administrator responsible for the landfill. Aviation Safety Landfills attract birds in search of food. Flying birds may interfere with aviation safety. Thus, landfills are typically not located in close proximity to airfields to minimize the risk that flying birds will interfere with airborne aircraft approaching or departing from an airport. The nearest airport to the Cedar Trail Landfill is the Bartow Municipal Airport, which is operated by the Bartow Aviation Development Authority. This airport is over five miles from the footprint of the active landfill and 4.6 miles from the boundary of the proposed site. Republic provided notice of the Application to all airports within six miles of the proposed landfill, the Federal Aviation Administration, and the Florida Department of Transportation. None of these entities objected to the proposed landfill. When Republic gave the Bartow Aviation Development Authority notice of an earlier application, which sought a permit for a landfill that would accept garbage, the authority objected to the proposal due to concerns posed by birds to aviation safety. When asked about the Application, the authority's executive director testified that she still has concerns about the proposed landfill, but she did not specify the nature of her concerns or her analysis. As explained in the Conclusions of Law, these are the only facts required for a determination of whether Republic has provided reasonable assurance of aviation safety. The record provides no basis for finding that Republic has failed to provide reasonable assurance of aviation safety. Neither the FAA nor the Bartow Aviation Development Authority has objected to the proposed landfill. The executive director's unspecified concerns do not override the absence of a formal objection from these agencies. Petitioners assign too much weight to the earlier objection submitted by the authority. The composition of the authority may have changed or some authority members may have decided they were wrong in their earlier analysis. This earlier objection does not outweigh the absence of objection to the present proposal from any of the aviation agencies and the absence of any evidence of the expected nature or extent of bird usage of the proposed landfill and the extent to which these birds would interfere with existing and expected flight paths of aircraft using the Bartow Municipal Airport. Public Health Petitioners' expert witness on public-health issues, Dr. David Carpenter, is a medical doctor with a long, prestigious history of public service, including with the Department of Defense, the National Institutes of Mental Health, the United States Public Health Service, and the New York Department of Health, where he served as director from 1980-85. At that time, Dr. Carpenter started the School of Public Health at the University of Albany. Republic's expert witness on public-health issues, Dr. Christopher Teaf, is an expert in the evaluation of environmental contamination, waste management, and toxicology, but not a medical doctor. Dr. Teaf is a professor at Florida State University and owns a small consulting firm. The major part of Dr. Carpenter's career has been devoted to research. For the past ten years, he has focused more on human health, especially human disease from exposure to environmental contaminants. Dr. Carpenter has considerable experience with the adverse effects of landfills on human health, but his experience has been mostly with older landfills, where containment measures were few and offsite releases were many. Clearly, Dr. Carpenter's experience does not extend to the role of landfill design, construction, and operation in the transmission of human disease. Thus, Dr. Carpenter is qualified to opine on the effects of pollutants that may escape landfills, but not on the relationship of landfill design, construction, and operation on the probability that a landfill will transmit pollutants. For the most part, Dr. Carpenter did not attempt to address matters outside of his expertise. However, Dr. Carpenter testified that the risk of disease or injury increased in relationship to the proximity of the person to the landfill. This testimony can only be credited if one assumes that the landfills are identical in terms of design, construction, and operation and in terms of the environmental conditions of the landfill site. In other words, in real-world applications, it is impossible to credit this element of Dr. Carpenter's testimony, especially to the extent of his implicit suggestion that public health is unreasonably endangered by the construction of a landfill, in compliance with all rules, that satisfies all of the separation criteria and design criteria set forth in the rules, as discussed below. By contrast, Dr. Teaf focused on the details of the proposed landfill. Applying his knowledge of toxicology, Dr. Teaf determined that the proposed landfill adequately protects public health. In making this determination, Dr. Teaf analyzed the effects of various design and operational characteristics of the proposed landfill, including the double liner system, the leachate collection and management system, the selection of appropriate waste types, the procedures for the evaluation and covering of sludges, the prohibition against municipal garbage, the restrictions on household items, the monitoring of groundwater and surface water, the stormwater management system, and the plans to control dust and odors. Dr. Carpenter's testimony and the literature that he sponsored suggested important links between older landfills and a wide range of human disease. But the recurring problem with Dr. Carpenter's testimony and the research articles that he sponsored was the inability to link this information to the proposed landfill. All of the landfills studied in his research articles were older, and most of them appeared to have been designed, constructed, and operated under far more relaxed regulatory regimes than exist today. Nothing in Dr. Carpenter's testimony or sponsored literature attempted to delineate the design or operational characteristics of these landfills, such as whether they were double- or even single-lined, served by leachate circulation and recovery systems, limited as to materials that they could accept, or required to install stormwater management and water monitoring systems. 93. Analysis of the risk to public health posed by the proposed landfill requires consideration of the various means of transmission of the pollutants received by the landfill: water, land, and air. Of these, water requires little analysis, on this record. Even Dr. Carpenter conceded that the proposed landfill does not appear to pose a threat to groundwater. The double liner, leachate collection and recovery system, and groundwater monitoring plan support the finding that groundwater transmission of pollutants from the proposed landfill is unlikely. Transmission by surface water is also unlikely. Compared to groundwater monitoring, surface water monitoring is limited. For instance, there is only a single monitoring site. Also, as noted above, the stormwater pond for the leachate storage area is expected to discharge stormwater offsite during excessive storm events, at which time surface water samples will be taken. However, a comprehensive surface water management system is in place at the landfill and will prevent offsite discharges in all but a few excessive rain events. Transmission by land is also unlikely. The Application contains engineering analysis of the proposed stability of the side slopes and a determination that they will be stable. The discussion of sinkholes, below, does not affect this finding. Treating dust as transmission by air, the only other means by which pollutants may transmit by land is by animals, such as insects, rodents, and birds. An important factor limiting the activity of animals in spreading pollutants offsite is the fact that the proposed landfill will not receive garbage. Although putrescible waste may be received within other categories of waste, the prohibition against receiving garbage will greatly reduce the amount of potential food sources for animals and thus the utilization rate of the proposed landfill by these animals. A further reduction in animal utilization will be achieved through the daily and intermediate cover requirements. Thus, transmission of pollutants by animals is also unlikely. Transmission by air takes several forms. Pollutants may be transmitted as or on dust, with water in the form of aerosol, or as gas. In terms of how transmission by air is addressed by the Permit, this means of transmission potentially represents a greater threat than transmission by water or land for four reasons. First, the explicit focus of the Permit, as to gas, is to avoid explosive concentrations of methane and objectionable odors, but not the transmission of other pollutants by air. Second, the effect of the Permit is to prohibit the release of pollutants into the groundwater or offsite surface water and to prohibit the release of pollutant-bearing land offsite, but no such flat prohibition applies to the offsite release of pollutants by air. Third, the leachate recirculation system provides a good opportunity for the release of certain pollutants into the air by aerosol or evaporation, but similar releases to offsite land, surface water, or groundwater are prohibited. Fourth, scientific understanding of the effects of exposure, especially by inhalation, to pollutants, especially in the form of organic compounds, is continuing to develop: with the use of chemicals increasing three fold in the 50 years preceding 1995 and approximately 80,000 chemicals in use in 2002, only a few hundreds of these chemicals have been subjected to long- or short-term study, resulting in the discovery that about 10% of the chemicals in use in 2002 were carcinogens. Transmission by dust appears to be limited by the frequent covering and spraying of the working faces. Although nearby residents complain of dust in their homes, the practices of the less-regulated Class III landfill cannot be extrapolated to the proposed Class I landfill. Thus, the prospect of dust transmission of chemicals contained in the fill received by the proposed landfill appears also to be slight. The use of untreated leachate as the spray medium to control the dust itself raises two risks, however. First, spraying leachate will release chemicals in aerosol. The potential range of aerosol is great, especially as the landfill ascends toward its design height of 190 feet. However, the risk of transmission by aerosol is reduced to insubstantial levels by adding a Permit condition that prohibits spraying during windy conditions. Second, depositing leachate on the landfill face will release chemicals through evaporation. The point of spraying the landfill face is to control dust between the addition of the waste materials to the pile and the application of the cover. Between these two events, dry conditions will sometimes intervene and may cause the evaporation of certain, but not all, pollutants. The leachate acquires pollutants as it percolates down the waste column and into the leachate collection system. As Dr. Teaf noted, the leachate becomes more concentrated as it recirculates, but, otherwise, this record is largely silent as to the likely composition of the recirculated leachate. However, for landfills accepting sludge, higher levels of mercury may be present in the leachate. As reported by the Florida Center for Solid and Hazardous Waste Management at the University of Florida, in a report issued March 2007, and titled, "Design and Operational Issues Related to Co-Disposal of Sludges and Biosolids and Class I Landfills--Phase III," one study found that the concentration of mercury in the leachate of landfills that receive sludge is almost three times greater than the concentration of mercury in the leachate of landfills that do not accept sludge. The same study reported that total dissolved solids and chlorides were present at greater concentrations at the landfills that did not accept sludge and that other parameters--unidentified in the cited article--were not significantly different between the two types of landfills. Republic proposes to recirculate substantial volumes of leachate--sufficient, for instance, to raise the moisture content of the fill from 25 percent to 28.9 percent. The Permit allows the proposed landfill to operate six days per week, for a total of 312 days annually. The Operation Plan prohibits the application of leachate during rain, but the number of days annually during which rain extends for the entire day is few, probably no more than a dozen. These numbers suggest that Republic may apply as much as 3.6 million gallons annually of untreated leachate to the landfill face. The 12,000 gallon-per-day limit and restrictions on head in the leachate collection and removal system effectively limit the quantities of leachate that may be recirculated, but the sole provision addressing leachate water quality is the annual monitoring event described above. Given the time required to analyze the many parameters included in the EPA regulation, for most of the year between tests, Republic will be applying over three million gallons of leachate whose pollutant concentrations will be completely unknown. Some assurances emerge, though, when considering air transmission of pollutants by class. In general, on this record, as to transmission by gas, there appears to be an inverse relationship between a compound's volatility, which is a measure of its ability to enter the air, and a compound's persistence. VOCs are one of the most dangerous classes of pollutants to public health and include such carcinogens as benzene, tolulene, xylene and, the most dangerous of all VOCs, vinyl chloride, which is released upon the degradation of such common substances as plastics, carpets, and upholstery. Biogas, which is generated by the anerobic decomposition of organic compounds in a landfill, contains mostly methane and carbon dioxide, but also significant levels of VOCs. When inhaled, the primary results of exposure to VOC are respiratory irritation and allergenic effects. Volatility is measured by vapor pressure, which is a measure of a chemical's ability to get into the air. As their name suggests, VOCs enter the air easily. They are also capable of traveling great distances due to their light molecule. However, VOCs are easily destroyed by sunlight and diluted by wind. Other organic compounds common to landfills are only semi-VOCs, such as PCBs. Although less volatile, these chemicals, too, are hazardous to public health--in the case of PCBs, in any amount. Due to this fact and their persistence in the environment, the United States has prohibited the manufacture of PCBs for over 30 years. However, not only are PCBs considerably less likely to enter the air than VOCs, they also travel shorter distances than VOCs due to a heavier molecule. Dr. Carpenter opined that there is little evidence that PCBs are an issue in the proposed landfill. Another class of organic compound, 1000 times less volatile than even PCBs, is phthalates, which are used in the production of plastics. Phthalates pose significant threats to public health, especially reproductive health. However, the exceptionally low volatility of this compound renders transmission by evaporation highly unlikely. Much of the regulatory framework imposed on landfill design, construction, and operation arises out of concerns for the control of human pathogens, which are infection-causing organisms, such as bacteria, viruses, protozoa, and parasitic worms. One of the great advances in human longevity in the United States occurred in the early 1900s--not with the development of antibiotics or improved medical care--but with the implementation of basic sanitation control and the removal of pathogens from the drinking water. For the proposed landfill, sludge will be the primary source of pathogens. Sludge is nutrient-rich organic matter, which will be received at the proposed landfill without any treatment except possibly dewatering. Even with the acceptance of sludge, the proposed landfill presents little risk for the transmission of pathogens. Pathogens communicate disease only when a person is exposed to an effective dose and are better transmitted by direct contact or animal than air. Bacterial pathogens are themselves killed by wind, as well as sunlight, temperature, and humidity differentials, so the preferred means of air transmission would be aerosol versus gas. The record permits no findings as to the persistence of pathogenic viruses, protozoa, and parasitic worms. However, as noted above in connection with the land transmission of pathogens, the immediate application of lime and cover to the sludge will tend to prevent the release of effective doses of pathogens by air, as well. The last major class of pollutant that could be transmitted by air is heavy metals, such as mercury or lead. Although these metals produce a wide range of neurological diseases and generally interfere with cognition and behavior, Dr. Carpenter admitted that heavy metals were not as much of a concern as VOCs, presumably due to their resistance to vaporization. Even though transmission by air is not as tightly controlled as transmission by water or land, for the four reasons noted above, there is little risk of transmission by air--i.e., dust, aerosol, or gas--when the specific properties of likely pollutants are considered. In all but five respects, then, Republic has provided reasonable assurance that public health will not be endangered by pollutants released from the landfill by water, land, or air. First, to provide reasonable assurance concerning public health, the Permit needs a condition that prohibits spraying leachate during windy conditions, which DEP may define as it reasonably sees fit. As noted in the Conclusions of Law, this is a requirement in the rules and, due to its importance, should be restated explicitly in the Permit, which restates numerous other rule requirements. Second, to provide reasonable assurance concerning public health, the Permit needs more frequent monitoring of leachate water quality, at least at the frequency, as noted in the Conclusions of Law, set forth in the rules. Large volumes of untreated leachate will be recirculated through the landfill. Even if aerosol transmission is controlled, transmission by evaporation of some pollutants, although not the heavy metals, is possible. Also, pollutants are concentrated in recirculated leachate and thus the consequences of transmission into groundwater or surface water, however unlikely, become greater. At the same time, the action leakage rate is generous--to Republic, not the groundwater. At 100 gallons per acre per day, Republic is not required to report to DEP possible liner leakage until about 7300 gallons per day are lost to the surficial aquifer. Suitable for the detection of catastrophic failures associated with most sinkholes, this action leakage rate is too high to trigger action for small liner leaks. If Republic is to be allowed this much leakage into the groundwater, it must identify the leachate's constituents and their concentrations at least semi-annually. Third, to provide reasonable assurance concerning public health, the Application must extend the right of split testing to all of the parties in these cases, if DEP fails to exercise its right to take a split sample. The spraying of untreated leachate and generous limit applied to liner leakage before reporting and remedial action are required underscore the importance to public health of independent leachate testing. There is no reason to allow budgetary constraints or administrative oversight to preclude Petitioners and Intervenor, who are uniquely situated to suffer from the escape of excessive pollutants in the leachate, from providing, at their expense, this independent leachate testing. Fourth, to provide reasonable assurance concerning public health, the Permit needs to restate accurately the language of the rules concerning the extent of knowledge required of Republic, if it is to be liable for the acceptance of certain prohibited wastes. Fifth, to provide reasonable assurance concerning public health, the Permit needs to be modified to ensure that at least one spotter, whose sole responsibility is spotting, will be assigned to each working face while the landfill is receiving waste. Sinkholes The sinkhole issue arises in the geotechnical analysis of the sufficiency of the foundation to support the considerable loads of a landfill and also in the stability of the side slopes of the landfill. This analysis starts with consideration of the geology of the area, of which Republic's property is a part, and, among other things, the potential for sinkhole formation in the area. The Cedar Trail Landfill lies within the Bartow Embayment and along the eastern slope of the Lakeland Ridge of the Central Lake District Physiographic Province. This embayment is a large erosional basin partially backfilled with phosphatic sand and clayey sand of the Bone Valley Member. At this location, the top of the Floridan Aquifer is formed by Suwannee Limestone, which consists of white to tan, soft to hard, granular, porous, very fossiliferous limestone with interbedded dolomite. This rock unit is 110-140 feet thick. Atop the Suwannee Limestone sits the Hawthorne Group, which comprises the Arcadia Formation, at the base of which is the Nocatee Member, which is a relatively impermeable sand and clay unit. Atop the Nocatee Member is the Tampa Member, which consists of hard, dense, sandy, locally phosphatic, fossiliferous limestone. The top of this member, which is the top of the Arcadia Formation, is locally referred to as the "bedrock complex," which marks the lower limit of phosphate mining. Atop the Arcadia Formation, still within the Hawthorne Group, sits the Peace River Formation, which consists of phosphatic clayey sand and clayey sand. The lower portion of the Peace River Formation is a relatively impermeable, undifferentiated clayey unit locally known as "bedclay." The Bone Valley Member of the Peace River Formation is mined for phosphate and is locally known as "matrix." Atop of the Peace River Formation are undifferentiated surficial soils, typically consisting of silty sand, clayey sand, and some hardpan and organic soils. These materials are locally known as "overburden." Phosphate mining is prevalent in the area, including, as noted above, much or all of the Cedar Trail Landfill site. Strip mining for phosphate normally removes the entire surficial aquifer, just into the bedclay. Mined areas are then backfilled with overburden spoil soils, clay, waste clay, and sand tailings. After backfilling, the soil strata bear little resemblance to premining strata. Sinkholes are prevalent in the general area surrounding the Cedar Trail Landfill. A sinkhole is a surface depression varying in depth from a few feet up to several hundreds of feet and in area from several square feet to several acres. Sinkholes are typically funnel-shaped and open broadly upward. Sinkholes form when weakly acidic groundwater creates cavities in the calcium carbonate within limestone. Soils above these cavities erode into the cavities. In the area that includes the Cedar Trail Landfill, cover-collapse and cover- subsidence sinkholes predominate among sinkhole types. A cover-collapse sinkhole, which is typically steep- sided and rocky, forms when cohesive soils over a limestone cavity can no longer bridge the cavity under the weight of overlying soil and rock. At this point, the cohesive soils suddenly collapse into the cavity. These are more common in the part of the state in which the Cedar Trail Landfill is located. A cover-subsidence sinkhole occurs due to the gradual lowering of the rock surface as solutioning occurs in the subsurface rocks. This type of sinkhole develops as subsurface soluble rock is dissolved and overlying soils subside into the resulting shallow surface depressions. Regardless of the type of sinkhole, borings into sinkholes will reveal zones of very loose soil sediments that have washed downward into the cavernous voids within the bedrock. This very loose soil zone is called a raveling zone, which starts at the limestone layer, as the overlying soils begin to collapse into the solution features within the limestone. As the loosening works its way upward toward the surface, it eventually results in the subsidence of the ground surface and formation of a sinkhole. Considerable sinkhole activity has taken place in the immediate vicinity of Republic's property. Most visibly, a sinkhole formed in 2006 in 285-acre Scott Lake, 4.5 miles northwest of the landfill. This sinkhole drained the entire lake and destroyed several structures. The Florida Geological Service sinkhole database, which consists of anecdotal reports of sinkhole activity, some of which are unverified, includes 49 sinkholes within five miles of the proposed landfill. Two documented sinkholes have occurred within .17 mile of the landfill--one of which is reported to be 125 feet in diameter and 80 feet deep. Based upon the information contained in the preceding paragraph, Clint Kromhout, a professional geologist with the Florida Geological Survey, opined on August 23, 2009, that the potential for sinkhole formation "within the proposed site and surrounding area" is "low to moderate." Mr. Kromhout does not provide a definition of "low," but part of his opinion is shared by the Golder Report, which agrees that the sinkhole potential on the proposed site is "low." The potential for sinkhole formation in the general area surrounding the proposed landfill, as distinguished from the site itself, is at least moderate. In their Proposed Recommended Order, Republic and Intervenor necessarily concede: "All parties acknowledge that the proposed landfill site is in a general region that has a relatively high frequency of sinkholes as compared with the rest of the state of Florida." It is misleading to characterize the area surrounding the proposed landfill as of low potential for the formation of sinkholes, unless there is another category, like "nonexistent." But characterizing the sinkhole potential of the surrounding area as moderate is not determinative of the likelihood of sinkholes at the landfill's footprint, nor is a site-specific geotechnical investigation mooted by such a characterization. Rather, characterizing the sinkhole potential of the surrounding area as moderate dictates the intensity and scope of the ensuing geotechnical investigation, if the investigation is to provide reasonable assurance of the structural integrity of the proposed landfill. Acknowledging moderate potential for sinkhole formation in the surrounding area, Republic has appropriately relied on three geotechnical reports, including three sets of boring data. The final of these reports, the Hanecki Report, is based on the collection and analysis of boring data, as well as a review of the data and analysis contained in the two earlier geotechnical reports, the Ardaman Report and Golder Report. The boring data reveal that the proposed landfill site features four units. Nearest the surface is Unit 1, which is brown to dark brown, medium- to fine-grained sand with minor amounts of clayey silt. Unit 1 is 0-10 feet thick. Next down is Unit 2, which is tan to gray, medium- to fine-grained sand with increasing silty clay or clayey silt. Unit 2 is 5-10 feet thick and generally marks the upper limit of fine-grained, granular soils (i.e., clayed sands and silty sands). Unit 3 is orange brown to yellow brown, gray and tan silty clay to clayey silt or fine sand and silty clay. Unit 3 is 5-15 feet thick. Unit 4 is gray and tan clayey silt or silty clay with minor amounts of fine sand. This material is very stiff or very dense, and most borings terminated in this unit. The few borings that penetrated this unit suggest that it may consist of dolomitic sandy clays and silts and dolomitic limestone to depths greater than 100 feet below grade. Units 3 and 4 generally mark the upper limits of low permeability/low compressibility soils. The Hanecki investigation comprised two main steps. First, Hanecki retained a subconsultant to perform electrical resistivity imaging (ERI) along 100-foot-wide transects run across the site. Any anomalies revealed by the ERIs were to be followed by standard penetration test (SPT) borings, which permit soil testing at predetermined intervals, as well as a measure of the compressibility of the soils. Compressibility is measured during the soil-testing intervals, during which the drill bit is replaced by a soil sampler. The driller records the number of blows required for a 140-pound hammer falling 30 inches to produce 12 inches of penetration. The value is expressed in N-values, where N represents the number of such blows. Looser soils produce lower N values. Another important piece of information obtained during SPT boring is the partial or total loss of circulation fluid during drilling. While the drill is penetrating soil, a slurry circulates through the borehole to prevent the collapse of the sides of the hole. This slurry is recycled during drilling, but, if the drill encounters a void, all or part of the circulation fluid is lost. The ERI survey revealed no real anomalies because of a narrow range of resistance values. However, taking relatively small differences in resistivity as an anomalies, Hanecki identified 14 features of interest. At each of these locations, Hanecki performed an SPT boring. Because the ERI transects were unable to span the two onsite ponds, Hanecki added two locations for SPT borings adjacent to each side of each pond, for a total of four additional SPT borings. At the request of DEP, Hanecki added a nineteenth SPT boring at Golder site G-11, which had revealed low N-values during Golder's borings. Hanecki extended the borings into "refusal" quality soil, which was defined as soils requiring more than 50 blows of the 140-pound hammer to achieve six inches or less of penetration. All of Hanecki's SPT borings encountered very hard limestone. Among the most significant findings of Hanecki's borings, only one boring, G-11, experienced any circulation fluid loss, and this was estimated at 50 percent. However, it is more likely that this partial circulation fluid loss is due to loosely deposited sands than a void that might be indicative of conditions suitable for sinkhole formation. Not all circulation losses indicate voids that that will result in sinkhole formation. Also significant among Hanecki's findings is a clayey soil, or bedclay, at every SPT boring, which severely limits hydraulic recharge to the limestone. By impeding vertical migration of surface and shallow subsurface water to the limestone layer, this bedclay "greatly inhibits limestone erosion." This bedclay also supports the looser soils above the bedclay and thus prevents raveling, without which sinkholes cannot form. Two borings--G-11 and F3-1--lacked a layer of Unit 3 or 4 soil above the limestone, but Hanecki concluded that the Unit 2 layers above the limestone at these locations contained sufficient clay or clayey sand to serve the same functions of impeding the downward movement of groundwater and preventing the downward movement of loose soils. This conclusion appears reasonable because Unit 2 is the uppermost reach of the finer- grained materials, of which clays and silts are examples when compared to sands. There is obviously some variability in the distribution of finer- and coarser-grained materials within each occurrence of Unit 2 soils. Hanecki's findings indicated intervals of loose soils, sometimes at depth, which typically would suggest raveling zones. At the proposed location, though, these findings do not support raveling due to the underlying bedclay layer and the history of mining, which probably introduced looser soils typically found closer to the surface through the entire 40-foot depth of the mine cut. Based on these findings, the Hanecki Report concludes that, regardless of at least moderate potential for sinkhole potential in the area, the footprint of the proposed landfill has an acceptably low risk of sinkhole development to permit development of the proposed landfill. This is a reasonable conclusion because it is supported by the data collected by Hanecki and his reasoned analysis of these data. Hanecki's conclusion is also supported by the data and analysis contained in the Golder Report and Ardaman Report, which are based on an additional 84 SPT borings, post- reclamation. Only about 12 percent of these SPT borings reached the limestone, and they cover all of Republic's property, not merely the footprint of the proposed landfill. Even so, these borings confirm two important findings of the Hanecki Report. First, they produced data indicative of an extensive bedclay layer intact on Republic's property. Second, the Ardaman and Golder borings reveal only two or three instances of partial circulation loss that, like the sole occurrence of partial circulation loss in the Hanecki borings, are located on Republic's property, but outside the footprint of the proposed landfill. Republic has provided reasonable assurance that the site will provide an adequate foundation for the proposed landfill and sinkholes are unlikely to undermine the structural integrity of the proposed landfill.

Recommendation It is RECOMMENDED that the Department of Environmental Protection enter a final order granting the Construction Permit and Operation Permit, but only if the Operation Permit is modified by the addition of the five items identified in paragraphs 172, 174, 175, 181, and 187. DONE AND ENTERED this 8th day of October, 2010, in Tallahassee, Leon County, Florida. S ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of October, 2010. COPIES FURNISHED: Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Tom Beason, General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Mimi A. Drew, Secretary Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Ronald L. Clark, Esquire Clark, Campbell & Mawhinney, P.A. 500 South Florida Avenue, Suite 800 Lakeland, Florida 33801-5271 William D. Preston, Esquire William D. Preston, P.A. 4832-A Kerry Forest Parkway Tallahassee, Florida 32309-2272 Jennings Kemp Brinson, Esquire Clark, Campbell & Mawhinney, P.A. 500 South Florida Avenue, Suite 800 Lakeland, Florida 33801 Sean R. Parker, Esquire Boswell & Dunlap, LLP 245 North Central Avenue Bartow, Florida 33830-4620 Ralph A. DeMeo, Esquire Hopping, Green, & Sams, P.A. 119 South Monroe Street, Suite 300 Tallahassee, Florida 32301 Stanley M. Warden, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Paula L. Cobb, Esquire Hopping Green & Sams, P.A. Post Office Box 6526 Tallahassee, Florida 32314 John W. Frost, Esquire Frost Sessums Van den Boom & Smith, P.A. Post Office Box 2188 Bartow, Florida 33831 John Stanley Fus Highland Lakes Estates HOA 2190 Boardman Road Bartow, Florida 33830

CFR (4) 40 CFR 25840 CFR 261.2440 CFR 261.4(b)(1)40 CFR 60 Florida Laws (4) 120.569120.57403.703403.707
# 5
HENDRY CORPORATION vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 92-002312 (1992)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Apr. 14, 1992 Number: 92-002312 Latest Update: Aug. 10, 1993

Findings Of Fact The Department (DER) is the regulatory agency of Florida charged with the duty and authority to administer and enforce Chapter 403 and Sections 376.30-376.319, Florida Statutes, and rules and regulations promulgated thereunder. Hendry is a Florida corporation that has been conducting business in excess of 60 years. The two main aspects of its business are the dredging operation and the shipyard. Hendry's site can be loosely described as an industrial site. The shipyard division performs approximately one-half its work for governmental entities, particularly the U.S. Coast Guard, which operations are largely ship refurbishing. Hendry has a Coast Guard certificate enabling it to receive mixtures containing oil and oily water waste. A significant portion of Hendry's ship refurbishing work involves repairing/replacing steel on ships which has deteriorated due to salt water exposure. That work frequently requires cutting, welding and burning. Prior to commencing the refurbrushing work, the ships must be certified as safe. In certifying a ship as being safe, the bilge area is pumped of used oil or waste oil which collects in standing waste water and oil. Also, before that works commences, the ship is defueled. Currently, Hendry's practice is to subcontract the pumping of waste oil from the ships bilge, which waste oil is pumped directly into the tanker truck of the subcontractor. Hendry no longer pumps or stores waste oil on site. In the past, the waste oil and water from the ship's bilge was pumped from the ship through a pipeline from the dry dock across the property to a 10,000 gallon above-ground storage tank. During December 1987, the U.S. Coast Guard observed a fuel spill on the water at Petitioner's facility. Based on that observation, Respondent conducted site inspections of Petitioner's facility during March and April 1988. The fuel spill was occasioned by Petitioner's refurbishment of a tuna boat at its site. Petitioner subsequently received a warning notice regarding alleged violations in its petroleum storage tanks and contamination. The transfer pipeline is of steel construction. Between 1980 and 1984, the pipeline leaked. In 1984, the pipeline was rerun with PVC line and in 1986, it was refitted with 4 inch steel pipe. The 10,000 gallon above-ground tank is located in Area 1. The removal of waste oil occasionally resulted in accidental spills. After 1985, a smaller, above-ground tank was installed adjacent to the 10,000 gallon tank to provide a storage tank for draining off water from the 10,000 gallon tank. The small tank was used to receive only water drained from the 10,000 gallon tank. Prior to installation of the small tank, a retention pond was used to drain water from the 10,000 gallon tank. The retention pond had a 2 foot berm with a visqueen liner. In October 1988, Hendry submitted an EDI Program Notification Application, a prerequisite for EDI reimbursement eligibility, under the program for costs associated with cleanup of certain petroleum contamination. In May 1989, Hendry submitted a document entitled Preliminary Contamination Assessment III Specific Areas--Task IV Rattlesnake Terminal Facility--Westshore Boulevard, Hillsborough County prepared by Mortensen Engineering, Inc. That document included reports of analysis of oil and groundwater samples taken from the site in January, March and April 1989, demonstrating extensive contamination of soil and groundwater including "free product" in monitoring wells MW-2, MW-4 and MW-4A. By letter dated November 9, 1989, the Department informed Hendry of its determination that the facility had been denied EDI reimbursement based on specific enumerated findings. Hendry entered into a stipulation with the Department on October 16, 1990, "regarding the conduct of this case and the basis for denial. " Attached to the stipulation is a sketch of the facility grounds showing a rough division of the area into four separate areas. Area 1 has two waste tanks. One was a large 10,000 gallon closed tank approximately 20 feet high and 12 feet in diameter; the other contained a volume of approximately 1,500-2,000 gallons and was an open tank. Petitioner's practice was to pump bilge in the dry dock area, located west of "Area 2" and direct the waste through underground pipes to the 10,000 gallon tank. The smaller tank was used to "bleed" water from the larger tank. Bilge waste is approximately two-thirds water. Area 2 was the location of Hendry's diesel tank farm. In the stipulation, the Department agreed to withdraw two of the seven specific grounds for the denial, namely denial of site access and failure to report discharges. Likewise, Hendry agreed to withdraw "Area 4" from its application for EDI eligibility. In the stipulation, Hendry was informed of a then recent amendment to Section 376.3071(9), which offered certain applicants who had been earlier determined ineligible for participation in the EDI program, standards and procedures for obtaining reconsideration of eligibility. The amendment required the facility to come into compliance, certify that compliance and request reconsideration prior to March 31, 1991. Additionally, compliance was to be verified by a Department inspection. Pursuant to paragraph 5(b) of the stipulation, these standards and procedures were specifically to be applied to Areas 2 and 3 at the facility. Hendry did not make a written request for reconsideration of the denial of eligibility with respect to Areas 2 and 3 on or before March 31, 1991 or at anytime subsequently. Hendry also did not come into compliance with the underground or above-ground storage tanks system regulations on or before March 31, 1991 in that Hendry failed to register a 560-gallon above-ground diesel storage tank which was onsite on that date as required by Rule 17-762.400, Florida Administrative Code. Hendry also failed to notify the Department of the Hillsborough County Environmental Protection Commission (HCEPC), as the administrator of a designated local program at least thirty days prior to closure of the storage tank system, pursuant to Subsection 376.3073, Florida Statutes. These determinations were made on April 1, 1991 by Hector Diaz, inspector in the HCEPC tanks program. Hendry submitted a registration form for the 560-gallon tank on November 18, 1991, which was of course subsequent to the March 31, 1991 deadline. Hendry stored petroleum products and waste material including petroleum constituents in the above-ground tanks until approximately March 25, 1991 when it initiated tank removal. Hendry's above-ground storage tanks, which were in use at its facility for approximately three years after extensive soil contamination was documented, were without secondary containment. In November 1991, Hendry submitted a document entitled Supplemental Preliminary Contamination Assessment Report, prepared by Keifer-Block Environmental Services, Inc. (Supplemental PCAR). The stated purpose of the study was solely to determine whether hazardous constituents were present in groundwater in Areas 2 and 3. The report included laboratory analysis of groundwater samples taken from the site in August 1991 including monitoring wells located in Area 3. The results of these analysis reflect that Area 3 is contaminated solely with heavy metals, lead and chromium. No petroleum hydrocarbon contamination was detected in Area 3. In the area adjacent to Area 2, seven of eight monitoring wells show chromium or lead contamination. Hendry had, and continues to have, a practice of removing paint from vessels by blasting them with a gritty material known as "black beauty." This practice takes place in the dry dock area near Areas 2 and 3. The waste blast grit/paint chip mixture is vacuumed or shoveled into wheelbarrels or a frontend loader and dumped into an open pile. Occasionally, the waste blast grit/paint mixture is blown about or spilled. Waste "black beauty" has been observed scattered on the ground throughout the facility. Paints sometime contain heavy metals, specifically, lead and chromium. The concentrations and distribution of lead and chromium contamination at the site are consistent with Hendry's long-standing practice of grit-- blasting paint from ships and other vessels and allowing the metal-contaminated paint and waste mixture to fall to the ground. Areas 2 and 3 are contaminated with substances other than petroleum or petroleum products, namely heavy metals. Costs associated with cleanup of lead and chromium are not reimburseable under the EDI program. Paragraph 5(c) of the stipulation allowed Hendry an opportunity to establish eligibility for Area 1 by providing information regarding operating practices at two above-ground storage tanks and a retention pond in that area demonstrating that contamination in that area is predominantly from leaks or unintentional spills of petroleum products from the tanks in that area. Hendry did not provide the required information. On January 27, 1992, Hendry submitted to the Department an affidavit executed by its principal, Aaron Hendry, which Hendry contends fulfills the requirements of paragraph 5(c) of the stipulation. Hendry, the principal who executed the affidavit, is an affiant with a legal and financial interest in the outcome of the EDI eligibility determination. The executed affidavit did not contain specific information with respect to "operating practices at the tanks and retention ponds as required by the stipulation." Specifically, the affidavit is silent as to: What the tanks were made of; When, how and by whom they were installed; What piping, leak detection or overfill protection was associated with them; What repairs or alterations had been made to them; What inventory reconciliation methods were used; Where the materials came from which was put into the tanks; In what manner, how often, and by whom material was put into the tanks; In what manner, how often, and by whom material was removed from the tanks; Disposition of material removed from the tanks; When, how, by whom and why the retention pond was dug; How and for what period of time the retention pond was used; How, often and by whom inspections of the tanks were conducted; When and how leaks occurred and were discovered at the tanks; When and how spills occurred and were discovered at the tanks; What records, including reports to state or local agencies, insurance claims, newspaper accounts, and so forth were kept with respect to leaks or spills at the tanks; What cleanup efforts were made at the time of any leaks or spills; Documentation related to registration of the tanks with state or local agencies; and Documentation with respect to any removal of the tanks, including any description of the condition of the tanks when, or if, removed. For years, the facility's retention pit was used as a "waste pit" namely, a rectangular hole in the ground, approximately 30 feet by 120 feet by 3 feet, for direct discharge of bilge waste piped from vessels at the dry dock area to the waste pit, prior to installation of the storage tank systems. After installation of the large tank in Area 1, the retention pit was used to bleed water from the bilge tank. In the past, the Department has denied eligibility to facilities where a retention pond was used for disposal of petroleum related waste and cleanup of contamination resulting from use of a retention pond. Hendry's affidavit nor other documentation submitted to the Department prior to the EDI redetermination or at hearing establishes that the bilge waste taken from the storage tanks was "a liquid fuel commodity" or recycled into such a commodity. By letter dated June 9, 1992, the Department notified Hendry that reconsideration of its EDI eligibility request for Areas 2 and 3 was denied and that the affidavit of Aaron Hendry submitted with respect to Area 1 did not satisfy the requirements of the stipulation. Thereafter, Hendry challenged the Department's denial of reconsideration and EDI eligibility which joins the issue for this proceeding. The hazardous waste allegation discovered during an inspection of Hendry's facility on April 14, 1988, resulted in a consent order which was entered as a final order of the Department on November 21, 1990. The consent order allowed Hendry an opportunity to demonstrate that not all areas at the facility were hazardous waste disposal areas and, thus, not all areas would be subject to closure and cleanup under the permitting requirements of Subsection 403.722, Florida Statutes and the remediation standards set forth in Chapter 17-730, Florida Administrative Code. To establish appropriate remediation standards and procedures which would be applicable to various areas, Hendry was required to prepare a property diagram designating areas at the property exhibiting any of the following types of contamination: Areas contaminated solely by petroleum or petroleum products or used oil which is not hazardous waste; Areas contaminated by materials which are not hazardous waste; Areas contaminated by the past or present disposal of hazardous waste. The consent order allows contamination assessment and remediation pursuant to the standards and procedures set forth in Chapter 17-770, Florida Administrative Code, for areas contaminated solely by petroleum or petroleum products. (Petitioner's Exhibit 5, paragraph 11.) The consent order requires contamination assessment and remediation pursuant to the Department's corrective action and groundwater contamination cases for all areas at the facility contaminated by used oil which is not hazardous waste or by hazardous material. (Petitioner's Exhibit 5, paragraph 12.) The consent order requires contamination assessment and remediation pursuant to a closure permit with a contingent post-closure plan to close the areas at the facility contaminated by the disposal of hazardous waste. In response to the consent order to delineate areas on the property exhibiting various types of contamination, Hendry submitted the supplemental PCAR. By letter dated March 19, 1992, the Department responded to the supplemental PCAR with a determination that: Area 1 can be assessed and remediated through the standards set forth in Chapter 17-770, Florida Administrative Code. Contamination in Areas 2 and 3 includes heavy metals, which are hazardous materials. Thus, Areas 2 and 3 should be assessed and remediated through the corrective action process for groundwater contamination cases. A hazardous waste facility closure permit application should be submitted for assessment and remediation of Area 4, which, because of the presence of Dichloroethylene, a hazardous substance and chlorinated solvent, should be expanded to include the location of monitoring well MW KBMW-2. Hendry had a practice of cleaning electrical motors by placing such motors on the ground outside the electrical repair shop near Area 4. The motors were sprayed with Trichloroethylene, a waste solvent, which was allowed to runoff into the soil. At the time of this practice, the intention was to leave the solvent contamination unchecked. The Department, pursuant to directives from the United States Environmental Protection Agency (EPA), characterizes the disposition of hazardous waste to the environment as a result of intentional, ongoing industrial practices as "disposal of hazardous waste" within the meaning of Subsection 475.703(21), Florida Statutes and 40 CFR 260.10. The consent order allowed Hendry an opportunity to challenge the Department's determination with respect to delineation of the various areas by filing a petition per paragraph 21 of the order for formal administrative hearings. Hendry filed its petition with respect to the March 19, 1992 letter, which petition is the subject of DOAH Case No. 92-2312.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that: Respondent, Department of Environmental Regulation, issue a Final Order in these consolidated cases concluding that 1) the contamination areas at issue herein are not eligible for EDI reimbursement under Subsections 376.3071(9) and (12), Florida Statutes; 2) that Petitioner cleanup the contamination in Areas 1, 2 and 3 under the guidance document entitled "Corrective Actions for Groundwater Contamination Cases"; and 3) that Area 4 be expanded to include the location of monitoring well MW KBMW-2 and closed through a hazardous waste closure/post closure permit application process. DONE AND ENTERED this 26th day of April, 1993, in Tallahassee, Leon County, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 1993. APPENDIX Rulings on Petitioner's proposed findings of fact: Paragraph 14, partially adopted in Paragraph 13, Recommended Order. Paragraph 19, rejected, contrary to the greater weight of evidence and speculative. Paragraph 20, rejected, unnecessary. Paragraph 21, rejected, contrary to the greater weight of evidence, Paragraphs 24-28, Recommended Order. Paragraph 22, partially adopted, Paragraphs 13 and 14, Recommended Order. Paragraph 23, partially adopted, Paragraph 15, Recommended Order. Paragraph 29, partially adopted, Paragraph 18, Recommended Order. Paragraphs 31, 32, 35, 48, 49, 51, 52, 60, 62 and 73 rejected, unnecessary. Paragraph 33, adopted in part, Paragraph 23, Recommended Order. Paragraph 38, adopted in part, Paragraph 23, Recommended Order. Paragraph 41, rejected, contrary to the greater weight of evidence and the two cases cited at hearing where Respondent exercises his discretion are distinguishable from Petitioner's failure to timely apply. Paragraph 43, rejected, unnecessary and/or argument. Paragraph 45, rejected, contrary to the greater weight of evidence. Paragraph 50, rejected, contrary to the greater weight of evidence, Paragraphs 37-39, Recommended Order. Paragraph 54, rejected, not probative. Paragraph 55, rejected, not probative. Paragraphs 56 and 57, rejected, contrary to the greater weight of evidence, Paragraphs 30 and 31, Recommended Order. Paragraphs 58 and 59, rejected, contrary to the greater weight of evidence, Paragraphs 23 and 24, Recommended Order. Paragraph 61, rejected, speculative and unnecessary. Paragraph 63, rejected, speculative. Paragraph 67, rejected, not probative. Paragraph 68, rejected, contrary to the greater weight of evidence, Paragraphs 30 and 31, Recommended Order. Paragraph 69, rejected, not probative. Paragraph 70, adopted in part, Paragraph 23, Recommended Order. Paragraph 72, rejected, irrelevant and not necessary to the issues posed. Paragraph 74, rejected, contrary to the greater weight of evidence and unnecessary. Paragraph 75, rejected, contrary to the greater weight of evidence, Paragraph 53, Recommended Order. Paragraph 76, rejected, contrary to the greater weight of evidence, Paragraph 53, Recommended Order. Paragraph 77, rejected, contrary to the greater weight of evidence, Paragraph 53, Recommended Order. Paragraphs 78 and 79, rejected, irrelevant and unnecessary. Paragraph 80, rejected, not probative. Rulings in Respondent's proposed findings of fact: Paragraphs 2 and 3, adopted in part, Paragraph 9, Recommended Order. Paragraph 12, adopted in part, Paragraph 23, Recommended Order. Paragraph 23, adopted in part, Paragraph 32, Recommended Order. Paragraph 27, adopted in part, Paragraphs 38 and 39, Recommended Order. Paragraph 30, rejected, unnecessary. COPIES FURNISHED: Thomas J. Patka, Esquire Rory C. Ryan, Esquire HOLLAND & KNIGHT 200 South Orange Ave - Suite 2600 Post Office Box 1526 Orlando, Florida 32802 Agusta P. Posner, Esquire Lisa Duchene, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399 2400 Virginia B. Wetherell Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399 2400 Daniel H. Thompson, Esquire Acting General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399 2400

USC (3) 40 CFR 260.1040 CFR 26140 CFR 261.31 Florida Laws (8) 120.57376.301376.3071376.3073403.703403.721403.722475.703
# 6
CITY OF NAPLES vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-001569 (1979)
Division of Administrative Hearings, Florida Number: 79-001569 Latest Update: Dec. 27, 1979

Findings Of Fact As a part of its solid waste disposal program, the City of Naples operates a yard trash compost site adjacent to the Gordon River within the city limits. A fifteen (15) acre site has been leased from a private owner, and the lease requires that the City operate the site in compliance with permitting requirements. The site is intended to received only horticultural yard trash. The City picks up such trash in trucks, and delivers it to the site. Cells, or ditches, have been excavated at the site to a depth of approximately six (6) feet. The trash is deposited into the cells. The cells are excavated to a depth below the ground water level, so the trash is placed directly into the ground water. Although only horticultural yard trash is intended to be disposed of at the site, and although the City attempts to enforce this intention, household garbage including food waste frequently finds its way into the cells. The City has been utilizing this site in this manner for approximately fifteen (15) years, and for at least the past ten (10) years has operated under all required local and state permits. The City is presently operating the site in accordance with a permit issued by the Department of Environmental Regulation on December 31, 1976. The permit expires on January 1, 1980. Sometime in February, 1979, the Department first gave notice to the City that the yard trash compost site was not being operated in conformity with all applicable rules and regulations. Specifically the Department advised the City that the site violated the provisions of Rule 17-7.04(2)(a), Florida Administrative Code, because solid waste was deposited within 200 feet of a natural water body (the Gordon River) and Rule 17-7.04(2)(f), because solid waste was deposited in an area where the water table was less than five (5) feet below the normal ground surface. Rule 17-7.04(2)(f) was modified during the course of this variance application proceeding. The rule now requires that solid waste not be deposited directly into the ground water. The City's site neither conformed with the rule in effect in February, 1979, nor with the present modified rule. The Department and the City agreed that the City could continue to operate the site pending the completion of this proceeding, and, until all present cell excavations are filled. Yard trash compost sites such as that operated by the City do not involve as profound a threat to water quality as do more generalized solid waste disposal sites. Nonetheless placing of large quantities of yard trash at or in water bodies will cause infusion of large quantities of nutrients into the water body. The composting or breaking down of yard trash can take place under either aerobic or anaerobic conditions. Aerobic decomposition takes place where vegetation is exposed to oxygen. Anaerobic decomposition takes place where there is no oxygen. If vegetation is covered by water or soil it will not have oxygen. The materials will only partially decompose through a process called fermentation. Such material, when not fully decomposed, cannot be fully compacted nor reduced in volume as would happen with aerobic decomposition. The system utilized by the City of Naples therefore will result in a springy texture to the area. When decomposition takes place above ground, and vegetation is exposed to oxygen, the Vegetation can break down into its primary elements, resulting in a humus material which can be utilized to condition soil, and which will become part of the soil and stabilize the soil. The City's method of disposal introduces very concentrated amounts of organic substances into the ground water. There is thus a large increase in nitrogen and phosphates in the ground water. Placing such large quantities of organic material into the ground water effectively pollutes the ground water. There is a shallow water aquifer below the surface level at the trash compost site. Below this aquifer is a layer of sand, marl and rock which is not highly permeable. Below this layer lies a second aquifer which is an important source of drinking water in the area. Trash at the compost site under the City's present system is deposited directly into the upper aquifer. This water flows either into the Gordon River adjacent to the site, or more slowly permeates down into the lower aquifer. Placing the organic materials into the ground water thus constitutes a serious source of pollution either to the Gordon River, or to the lower aquifer, or to both. Certainly it serves to profoundly degrade the water quality of the ground water. The City has operated two (2) test wells adjacent to the site for the past eighteen (18) months. Results of samples taken from these test sites are inconclusive, and do not reveal that the City's disposal system has caused any pollution whatsoever. This does not mean, however, that no adverse impact could have been detected, or that none has taken place. The City's test wells were not placed so that they would intercept the flow of ground water from the site. Even if they had been so placed, testing has taken place only every six (6) months, and not in a manner so that any viable conclusions can be reached. The Department has recently installed test wells, and although data from them is not complete, it does reveal a definite flow of pollutants from the site to the test wells. Although the flow of ground water will serve to dilute the pollutants to some degree, it is inevitable that the ground water supply itself will be degraded, and that eventually either the waters of the Gordon River or of the lower aquifer will also be adversely affected. Under its present system the City estimates that it will be able to utilize the compost site for eight more years. The City has contended that operating the site as an above ground compost site would effectively cut in half the time period over which the site could be utilized and would increase the cost of maintaining the site by requiring additional equipment, and eventually requiring additional equipment for the transporting of yard trash to a remote site. These contentions are not supported by the evidence. In the first place the City could save money in operating the site as an above ground composting site because it would not be necessary to make excavations. Furthermore, above ground composting of the materials would result in usable compost which could be sold as land fill. This could constitute a source of revenue, and also open the site for additional usage.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED: That a final order be entered granting the variance application filed by the City of Naples with respect to its request to be relieved from the requirements of Rule 17-7.04(2)(a), with conditions imposed as set out in the Department's notice dated June 21, 1979 (DER Exhibit 4). That a final order be entered denying the exemption request filed by the City of Naples with respect to the requirements of Rule 17-7.04(2)(f). RECOMMENDED this 28th day of November, 1979, in Tallahassee, Florida. STEVEN PFEIFFER Assistant Director Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: David W. Rynders City Attorney City of Naples 735 8th Street South Naples, Florida 33940 Ray Allen Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (5) 120.54120.57403.201403.7047.04
# 8
DEPARTMENT OF ENVIRONMENTAL REGULATION vs ANTHONY VIGNA AND AVA HAZARDOUS WASTE REMOVAL AND DISPOSAL, INC., 91-003195 (1991)
Division of Administrative Hearings, Florida Filed:Miami, Florida May 21, 1991 Number: 91-003195 Latest Update: May 20, 1992

The Issue The issue is whether Dr. Vigna and his corporation, AVA Hazardous Waste Removal and Disposal, Inc., should be disciplined for the improper disposal of hazardous waste.

Findings Of Fact Lyn-Rand, Inc., was a corporation in the metal fabrication and painting business in Dade County, Florida, during April and May of 1989. The industrial processes used by Lyn-Rand required the use of solvents, cutting oils, and other chemicals. Lyn-Rand employed Courtney Warrenfeltz as its quality control director. Mr. Warrenfeltz had met Dr. Anthony Vigna, who held himself out as a transporter of hazardous waste. Dr. Vigna offered to dispose of 55-gallon drums of waste which had accumulated at the Lyn-Rand facility. Dr. Vigna took samples of the waste, offered to use his federal EPA identification number in connection with the disposal, and do all the paper work involved with the disposal. Mr. Warrenfeltz believed, based upon his conversations with Dr. Vigna, that Dr. Vigna was knowledgable about hazardous waste disposal. Mr. Warrenfeltz made arrangements for Dr. Vigna to pick up nine drums of cutting oils and cleaning solvents on Saturday, April 29, 1989. Dr. Vigna was paid $500 per drum. Those drums had been marked with "x's" on the tops and sides. An employee of Lyn- Rand, Carlos Alayon, had been left instructions to expect Dr. Vigna, and had been given a check to give Dr. Vigna when the drums were picked up. While Dr. Vigna was at the Lyn-Rand site to pick the drums up, he asked Alayon for some black paint which Dr. Vigna used to paint over the labels on the drums. Alayon then helped Dr. Vigna load the drums into a rental truck. Dr. Vigna gave Mr. Alayon no paperwork, such as a manifest, receipt, or shipping papers. Mr. Warrenfeltz never received any paperwork from Mr. Alayon or from Dr. Vigna. The drums Dr. Vigna took from Lyn-Rand were discovered later, Saturday, April 29, 1989, at the business premises of Compliance Technology, Inc., a corporation located in Broward County, which is licensed to act as a broker for hazardous waste. Compliance Technology, Inc., does not, however, act as a transporter of hazardous waste. The employee of Compliance Technology who found the drums near the back loading dock, Mike Webb, was concerned, because their labels had been obliterated with black paint and the only marks on the drums were the "x's." The obliteration of the labels was a cause for concern and the bungs appeared to be leaking around the tops of two of the drums. The drums had been abandoned near a storm drain. The drums were not fenced or secured; if someone had driven into them due to their placement on the ground near the loading dock, the drums could have ruptured and the contents flowed into the storm drain and eventually into the Biscayne Aquifer. Mr. Webb notified the founder of Compliance Technology, Dr. Solon Cole, of the discovery of the drums, and the matter was reported on or about May 1, 1989, to the Broward County Environmental Quality Control Board and the City of Hollywood Police Department. Compliance Technology moved the drums away from the storm drain, barricaded them, and replaced bungs in two of the drums. On or about May 5, 1989, Dr. Cole notified Jeff Tobergte, of the Department of Environmental Regulation office in West Palm Beach, about the drums. Mr. Tobergte went to Compliance Technology the next day, and photographed the drums and sampled their contents. He found that the drums contained various solvents, including methylene chloride, ethylbenzene, toluene, xylene and phenol. The samples had a pH of less than 2 and a flash point of less than 60 degrees centigrade, and therefore were hazardous wastes. Dr. Cole and Mr. Tobergte were able to determine that one of the drums had a label which stated "Spray Iron Phosphatizer and Cleaner" "SC-283" from Novamax Tech in Atlanta, Georgia. After contacting Novamax Tech, Mr. Tobergte learned that SC-283 is an unusual product with only four buyers in Florida, three of them in Dade County, including Lyn-Rand. Mr. Tobergte then drove to all three locations in Dade County which were customers of Novamax Tech, and determined that the most likely source of the drums at Compliance Technology was Lyn-Rand. Mr. Tobergte visited Lyn-Rand on May 8, 1989, and verified that the drums he had photographed were drums which originated at Lyn-Rand. The verification was made by comparing the photographs of the drums left at Compliance Technology with drums at Lyn-Rand which still had labels. Mr. Warrenfeltz recognized the markings on the photos of the drums left at Compliance Technology. The pine needles found on the drums were also significant, since drums were stored in a manner at Lyn-Rand which lead to pine needles falling upon them. Mr. Warrenfeltz told Mr. Tobergte that Lyn-Rand had recently shipped nine drums and recognized the drums from the photographs as those delivered to Dr. Vigna. Lyn-Rand removed the drums from Compliance Technology's property and arranged for their proper disposal. Neither Dr. Anthony Vigna nor AVA Hazardous Waste Removal and Disposal, Inc., has any EPA identification number. After the discovery of the abandoned drums, Mr. Vigna mailed a letter to Compliance Technology on May 10, 1989. The letter was backdated to April 28, 1989, and states in part that it was sent to Dr. Solon Cole, the President of Compliance Technology, "to make you aware of a delivery of nine drums that my driver will be leaving off at your plant." The letter was an after-the-fact attempt by Dr. Vigna to cover himself, which is foiled by the postmark date the letter bears. The content of the letter itself, however, leaves the impression that Dr. Cole and Compliance Technology had no prior awareness of the delivery, which is consistent with the testimony of Dr. Cole, that he had not agreed to any delivery of hazardous waste by Dr. Vigna, because Compliance Technology is not a hazardous waste storage facility, or a transporter of hazardous waste. It had acted as a broker for entities needing to dispose of hazardous waste. Dr. Vigna had visited Compliance Technology, and should have known that it did not store hazardous waste. This after-the-fact letter is also inadequate to constitute a shipping manifest for the hazardous waste delivered by Dr. Vigna, for there is no designation of the source of the material, or explanation of the contents of the drums. It does not approximate the kinds of documents used by legitimate hazardous waste transporters. Perhaps most significantly, Dr. Vigna and his company never contacted Dr. Cole after the drums were dropped at the Compliance Technology site to make arrangements to pay Compliance Technology for handling the drums, as the letter of May 10, 1989, suggests. Dr. Vigna maintains that his delivery of the drums to Compliance Technology was the result of a misunderstanding he had with Dr. Solon Cole. Dr. Vigna maintained that he and Dr. Cole had discussions concerning possible business ventures and he told Dr. Cole that he would be delivering nine drums of cutting oils and cleaning solvents to Compliance Technology, Inc. This testimony is rejected as much less credible than that of Dr. Cole, and because of the rather significant problems with the letter Dr. Vigna mailed on May 10, 1989, which was designed to cover himself, not to notify Compliance Technology of a delivery before the delivery was to be made. There is some slight corroboration of Dr. Vigna's version of the facts which arises from the decision of Compliance Technology not to press criminal charges against Dr. Vigna. The lawyer for Compliance Technology, Arthur Luongo, wrote to the Assistant State Attorney on June 7, 1989, and said: I have a great concern that Compliance Technology may be liable for a malicious prosecution action should they [the employees of Compliance Technology] testify in a criminal proceeding against Mr. Vigna. I see the case as one of simple civil negligence arising out of an honest, though admittedly stupid, mistake. It is the intention of Compliance Technology to become a public corporation within a year, and being the defendant in such a suit could seriously effect the value of their stock. They do, however, intend to recover civil restitution for their time, efforts and energy in locating Mr. Vigna. At best, this letter demonstrates that Compliance Technology had its own reasons for not wanting to press any criminal proceedings, but does not show that Dr. Vigna's actions were proper. Dr. Vigna's position would have been much more persuasive if the letter sent to Compliance Technology had actually been sent near the time it was dated (April 28), or if he had made contact with Dr. Cole to discuss pricing for what Dr. Vigna contends would have been Compliance Technology's efforts in arranging for final disposal of the Lyn-Rand material. It is strange that Dr. Vigna arrived at a price to charge Lyn-Rand without knowing what his price for disposal would be from Compliance Technology. That cost to Dr. Vigna was not relevant if Dr. Vigna intended merely to dump the material. The Department's characterization of the material as abandoned by Dr. Vigna is sustained by the evidence. Dr. Vigna acted as a transporter of hazardous waste. Because the drums were rusted, two bungs had to be replaced, and were leaking, Dr. Vigna is properly regarded as having caused pollution in transporting and leaving them at Compliance Technology. The Department incurred $2,936.58 as costs and expenses in tracing the pollution back to Dr. Vigna and arranging for its proper disposal.

Recommendation It is RECOMMENDED that Dr. Vigna and AVA Hazardous Waste Removal and Disposal, Inc., be found guilty of the violations alleged in the Administrative Complaint, that a final order be entered directing them to refrain from the transportation of hazardous waste unless they first notify the Florida Department of Environmental Regulation, obtain an EPA identification number, demonstrate their financial security, and comply with all standards and procedures required by rules of the Department and applicable federal regulations; it is also RECOMMENDED that they be required, jointly and severally, to reimburse the Department $2,936.58. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 1st day of April 1992. WILLIAM R. DORSEY, JR. Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of April 1992. APPENDIX TO RECOMMENDED ORDER The Petitioner's proposed findings of fact are addressed as follows: Adopted in Finding 1. Generally adopted in Finding 1. Adopted in Finding 1. Adopted in Findings 1 and 2. Adopted in Finding 2. Adopted in Finding 3. Adopted in Finding 3. Adopted in Finding 3. Adopted in Finding 3. Adopted in Finding 4. Adopted in Finding 4. Adopted in Finding 5. Adopted in Finding 6. Adopted in Finding 7. Adopted in Finding 8. Adopted in Finding 9. Adopted in Finding 10. Adopted in Finding 10. Adopted in Finding 10. Adopted in Finding 11. Adopted in Finding 12. Rejected as redundant of Finding 1. Adopted in Finding 16. The Respondent's proposed findings of fact are addressed as follows: Adopted in Finding 1. Adopted in Finding 3. Adopted in Finding 10. Rejected, see Finding 13. Rejected as unnecessary. Adopted in Finding 14. Adopted in Finding 15. Adopted in Finding 4. Rejected for the reasons stated in Findings 10-15. Rejected, see Finding 11. It is in the nature of a manifest that it needs to be delivered with the material it is designed to accompany. A "manifest" which Dr. Vigna maintained as his own record is no manifest. Rejected because the material was left unsecured near a loading dock. Its location near the storm drain, and the obliteration of the labels lead to the conclusion that the way was it was left did constitute an imminent hazard. Rejected, see Finding 3. Rejected because the leakage from the bungs, while not severe, did present the risk of pollution through contamination of the Biscayne Aquifer if any of the contents of the nine drums had been introduced into the storm drain. Rejected, see Finding 3. COPIES FURNISHED: Agusta P. Posner, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Steven N. Rosenthal, Esquire Suite 1040 City National Bank Building 25 West Flagler Street Miami, Florida 33130 Carol Browner, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

# 9
INDUSTRIAL WASTE SERVICES, INC. vs. DEPARTMENT OF TRANSPORTATION, 88-003060BID (1988)
Division of Administrative Hearings, Florida Number: 88-003060BID Latest Update: Jul. 29, 1988

The Issue The issue is whether the Florida Department of Transportation correctly awarded a series of five road sweeping contracts. The agency's intended decision resulted in the protest of four contract awards by Industrial Waste Service, Inc., and one contract by Dave Smith and Company, Inc.

Findings Of Fact The Florida Department of Transportation prepared bid packages for a series of contracts for mechanical sweeping of state roadways in Dade County and distributed them to interested parties. The bid blanks indicated that the bids would be opened at 10:00 a.m. on May 12, 1988. The bid package included a sheet entitled "Protest Sheet" which states: Unless otherwise notified by certified mail, return receipt requested, bid tabulations will be posted at 1000 N.W. 111th Avenue, District Contracts Office, Miami, Florida 33172, on the 7th day from the letting date. Upon posting, it will be the Department's intent to award to the low bidder. Any bidder who feels he is adversely affected by the Department's intent to award to the low bidder must file with the Clerk of Agency Proceedings, Department of Transportation, Haydon Burns Building, M.S. 58, Room 562, 605 Suwannee Street, Tallahassee, Florida 32399-0458, a written notice of protest within 72 hours of posting of the bid tabulations. (Emphasis is original) The bid blank also contains a form entitled "Proposal" which states in part: The undersigned further agree(s) ...to execute the Contract within 20 calendar days after the date on which the notice of award has been given.... A contract form is also included in the bid blank, which ultimately will be executed by the successful bidder and the Department. The bid tabulations were posted at the Department's office on May 19, 1988, although they were posted later than 10:00 a.m. The Department also sent the tabulations by certified mail that day to all parties who had submitted bids. No return receipts were offered into evidence; the envelope mailed to Dave Smith and Company, Inc., was presented at the hearing, but no party moved its admission into evidence. The two green postal strips taped to the back of that letter are indicative of the use of removable return receipt cards. The Hearing Officer concludes that the Department mailed bid tabulations to bidders by certified mail, return receipt requested. The certified letter containing tabulations was received by Dave Smith and Company, Inc., either during the weekend of May 21 and 22 or on the morning of Monday, May 23, 1988. Based on the evidence, the Hearing Officer concludes that the bid tabulations mailed by the Department were received by Industrial Waste Service by certified mail, return receipt requested, on Monday, May 23, 1988. Industrial Waste Service filed its notice of protest with respect to four contracts on May 24, 1988. In the interim between the posting of the bid tabulations and the filing of any notices of protest, the Department of Transportation made the bid packages submitted by all bidders available for public inspection pursuant to Chapter 119, Florida Statutes, the Public Records Law. The bid packages were examined by Mrs. Dave Smith, of Dave Smith and Company, Inc. After that examination, the papers making up each bid had been detached (i.e., staples removed). Mrs. Smith had rearranged the pages of the bid submissions from the order in which they had been received, leaving a jumbled mass of paper. She informed the Department that the equipment list was not contained in Industrial Waste Service's bid submission for Contract E-6285. The Department of Transportation was unable to authenticate its bid files at final hearing as complete files or as files containing the bids submissions in the same condition as when they were initially received by the Department of Transportation. The original bid submission of Industrial Waste Service for Contract E-6287 is now completely missing from the Department's records. Industrial Waste Service, Inc., submitted a number of bids for the road sweeping contracts which were being let. The bid file for Contract E-6285 now has no equipment list attached. Such a list is required by the Special Provisions section of the bid specifications. The testimony of Dan Pavone of Industrial Waste Service that an equipment list had been attached to all bids when submitted to the Department of Transportation is accepted. With respect to Contracts E-6286 and E-6288, the bid submissions for Power Sweeping Service, Inc., contain no equipment list. The testimony of Joseph Caplano of Power Sweeping Service, Inc., that equipment lists were included when the bids were submitted to the Department of Transportation is accepted. Errors occurred in the bids submitted by Industrial Waste Service, Inc., for Contracts E-6287 and E-6289. On the bid cover page, the contractor filled in his bid price for the contract. The cover page for each of the sweeping contracts let look very similar. Industrial Waste Service switched the cover pages on these two contracts, so that for Contract E-6287 it apparently bid $38,849.11 but had meant to bid $135,442.95. On Contract E-6289 it bid $135,442.95, when it meant to aid $38,849.11. The cover sheet is not the only page on which the bidder indicates his total price. There is a matrix page in the bid submission which describes the different items of service (i.e. litter removal, sweeping), the approximate quantities of units of service (such as miles to be swept), and the bidders fill in unit price figures (i.e., cost per mile of sweeping or litter removal). The unit prices are then extended and the extended prices are summed to produce the total bid amount. These sheets had also been switched. It is readily apparent that the bids were switched, because the pre-printed quantities such as mileages for sweeping on the two contracts are switched. Moreover, at the bid opening, other bidders immediately understood that these two bids of Industrial Waste Service were wildly out of line, but made sense if the bids had been switched. The representative of the Department also agreed at the final hearing that the differences in the quantities shown on the matrix page showed the sheets had been switched by the bidder. Industrial Waste Service does not want to perform a contract on which it meant to bid $135,442.95 for $38,849.11. It inquired whether it would be penalized in any way if its protest were not upheld, the Department awarded it Contract E-6287 for $38,894.11, and it withdrew that bid. Department employees informed Industrial Waste Service that it could withdraw the bid without penalty.

Recommendation With respect to each contract, the following is recommended: Recommended Contract No. Description Agency Action E-6285 Protest by Dave Smith and Company, based on absence of equipment list on Industrial Waste Service's bid submission. Contract should be awarded to Industrial Waste Service, Inc. E-6286 Protest by Industrial Waste Service based on absence of equipment list in Power Sweeping Service's bid submission. Contract should be awarded to Power Sweeping Service, Inc. E-6287 Bid of Industrial Waste Service should be re- cognized as a bid of $135,442.95, but it still would not be the lowest bid. Contract should be awarded to Power Sweeping Service, Inc E-6288 Protest by Industrial Waste Service based on absence of an equipment list in bid submission of Power Sweeping Service, Inc. Contract should be awarded to Power Sweeping Service, Inc. E-6289 DOT should recognize the Contract should be transposition of informa- awarded to tion in bids by Industrial Waste Industrial Waste Service Service, Inc. on this contract and Contract E-6287, and treat Industrial Waste Service's bid as a bid of $38,849.11, which would be lower than the bid of Dave Smith and Company of $41,985.42. The protest of Industrial Waste Service should be upheld. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 29th day of July, 1988. WILLIAM R. DORSEY, JR. Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of July, 1988. APPENDIX TO RECOMMENDED ORDER CASE NOS. 88-3060BID, 88-3061BID, 88-3062BID, 88-3063BID Rulings on proposed findings of fact Industrial Waste Service, Inc.: Covered in Statement of the Issue. Covered in Finding of Fact 4. Covered in Findings of Fact 5 and 6. To the extent relevant, covered in Finding of Fact 6. Covered in Finding of Fact 8. Covered in Finding of Fact 8. Covered in Finding of Fact 7. Covered in Finding of Fact 9. Covered in Findings of Fact 10 and 11. Rejected as unnecessary because no party disputed that Power Sweeping Service's bid was lowest. Rejected as irrelevant because all parties included equipment lists in their bids. Rulings on proposed findings of fact of Department of Transportation: Covered in Finding of Fact 1. Covered in Finding of Fact 2. Rejected as unnecessary. Covered in Finding of Fact 10. Covered in Finding of Fact 7. Covered in Finding of Fact 7. Rejected as unnecessary. Covered in Findings of Fact 8 and 9. Due to the finding that the documents were included in the bids submissions, rejected as unnecessary. Rejected because the Department's position that the equipment list is not an essential document to be submitted by a contractor with whom the Department has done business in the past, but is essential in a bid submission by a contractor who the Department has not done business before is unreasonable, and places bidders on different footings. In view of the finding that all bidders did submit equipment list, the Department's position is of no consequence to the decision here. Rejected as unnecessary. Rejected as unnecessary and for the reasons stated for rejecting Finding of Fact 10. Rejected as unnecessary. Rejected as unnecessary and for the reasons given for rejecting Finding of Fact 10. Rejected as unnecessary. Rejected as argument, not a finding of fact. Rejected as unnecessary. Covered in Finding of Fact 4. Rejected as unnecessary. Covered in Finding of Fact 6. COPIES FURNISHED: David A. Jones, Esquire Gregory P. Borgognoni, Esquire Tew, Jorden & Schulte 701 Brickell Avenue Miami, Florida 33131-2801 Mr. Dan Pavone Industrial Waste Service, Inc. 380 N.W. 37th Court Miami, Florida 33142 Dave H. Smith, President Dave Smith & Company Post Office Drawer 7177 Ft. Lauderdale, Florida 33338 Specialized Services Post Office Box 840006 Pembroke Pines, Florida 33084 Mr. Joseph Caplano Power Sweeping Service Post Office Box 984 Hialeah, Florida 33011 Christine E. Bryce, Esquire Department of Transportation District Six Office 602 South Miami Avenue Miami, Florida 33130 James W. Anderson, Esquire Department of Transportation Haydon Burns Building, M.S. 58 605 Suwannee Street Tallahassee, Florida 32301-8064 Kaye N. Henderson, Secretary Department of Transportation Haydon Burns Building, M.S. 58 605 Suwannee Street Tallahassee, Florida 32399-0458 Thomas H. Bateman, III, Esquire General Counsel Department of Transportation Haydon Burns Building, M.S. 58 605 Suwannee Street A Tallahassee, Florida 32399-0458 =================================================================

Florida Laws (4) 120.53120.6835.22849.11