FLORIDA DEPARTMENT OF HEALTH vs CARLOS M. CASANOVA, AND BUSY BEE SEPTIC, INC., 12-003368 (2012)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Oct. 11, 2012 Number: 12-003368 Latest Update: Mar. 26, 2013

The Issue Did Respondents violate Florida Administrative Code Rules 64E-6.010(5) and (7) by dumping untreated septage (untreated septic tank waste) onto the ground, instead of transporting it to an approved treatment facility? Did Respondents commit gross negligence, incompetence, and/or misconduct by dumping untreated septage onto the ground in violation of rule 64E-6.022(1)(n)? Did Respondents create a sanitary nuisance, exposing human and animal life to untreated human waste and endangering the public's health and safety by dumping untreated septage onto the ground in violation of rule 64E-6.022(1)(q)? If Respondents committed any of the offenses described above, what penalties should be imposed?

Findings Of Fact Mr. Casanova is a registered septic tank contractor, registration no. SR0041469. Mr. Casanova is the qualifying registered septic tank contractor for Busy Bee Septic, Inc. Mr. Casanova is authorized to provide septic tank contracting services through Busy Bee Septic, Inc., authorization no. SA0041225. Permit no. 36-QA-29343, issued by Lee County Health Department, authorizes Busy Bee to provide septage collection and disposal services. The permit authorizes Busy Bee to pump out septic tanks and transport septage collected from the tanks to an authorized disposal site. The permit does not authorize treatment of septage. It also requires Busy Bee to dispose of the septage at a permitted wastewater treatment facility. Carlos Casanova and Busy Bee are authorized to, and have provided, septic tank contractor services in Lee, Charlotte, and Collier Counties. The business operates 24 hours a day, seven days a week. Mr. Casanova and Busy Bee own and operate three 4,000-gallon septage collection trucks. Each truck has a passenger cab with a large tank behind it. Mr. Casanova delegates most field work to four male Busy Bee employees. Field work includes pumping septic tank contents into the trucks' tanks and transporting the septage to proper storage and disposal sites. Busy Bee is authorized to dispose of septage at Crews Environmental and Charlotte County Utility. On June 15, 2012, at approximately 10:45 p.m., a Busy Bee truck parked pointing east on the north side of Jacaranda Boulevard in Cape Coral, Lee County, Florida. Individuals with the truck ran a hose from the truck's tank into the wooded area beside Jacaranda Boulevard and discharged untreated septage into the wooded area through the hose. This is an area of palmetto and pine woods, with sandy soil. The water table lies about two feet below the surface. The next day the area where the contents of the Busy Bee truck had been discharged smelled strongly of sewage. Sewage sludge and bits of toilet paper were visible on the ground and palmetto fronds, along with marks in the dirt where the hose discharging the septage from the tanks had lain. Four days later, the 20-by-30-foot wooded area where the Busy Bee truck pumped out septage was still saturated with sewage and sludge. Traces of toilet paper remained, and the area still smelled of sewage. The hose marks remained also. The Busy Bee truck had discharged approximately 3000 gallons of septage into the area. The septage was soaking down through the sandy, porous soil to the groundwater. Septage discharged like this is a sanitary nuisance dangerous to human and animal life. It exposes animals and humans to pathogenic viruses. Eye witness testimony and photographs clearly and convincingly establish the presence of septage in the area alongside Jacaranda Boulevard. The same is true of the marks showing hoses had been run from the edge of the road to the area where the truck discharged the septage. The fact that a Busy Bee truck discharged septage onto the ground beside Jacaranda Boulevard the night of June 15, 2012, is also established by clear and convincing evidence. The evidence includes the very credible testimony of John Hendrick. The testimony of Laurie Hendrick corroborates his testimony. So, too, did photographs of the area where the septage was dumped and photographs of Busy Bee trucks. On June 15, 2012, Mr. and Ms. Hendrick were taking an evening drive in the area, which is close to their home, as was their custom. They both saw the truck when they first passed it. At that time, the truck was turning around on a side street. Mr. Hendrick was concerned when he saw the truck in a lightly populated residential area surrounded by wetlands. For this reason he drove past it again at the end of their drive to observe what the truck was doing and identify the name on the company's truck. Mr. Hendrick focused on identifying the truck by reading the name painted on it. The name Busy Bee was prominently displayed on the truck. Mr. Hendrick's testimony that Busy Bee was the name on the truck is credible, clear, and convincing for a number of reasons. He was paying close attention and concentrating on the name on the truck. Mr. Hendrick took the time needed to make sure he read the name. He slowed to 25 miles per hour to make sure that he could read the name. Although it was an evening, it was a summer evening, and there was enough light, especially with the aid of the car headlights. Mr. Hendrick's memory is clear and is his own. No one suggested the name Busy Bee to him. His emails the next day, trying to draw the authorities' attention to the septage discharge, identified the truck as a Busy Bee truck. Mr. Hendrick is also a trained observer. Before retiring, he worked 18-to-20 years in an emergency room where careful observation is an important skill. There is no indication that Mr. Hendrick's eyesight is impaired. Mr. Casanova argues that Mr. Hendrick's eyesight is deficient, because Mr. Hendrick had not had his eyes tested in three years. No evidence establishes that a person whose eyesight has not been tested in three years presumptively has impaired vision. Mr. Casanova also argues that because Mr. Hendrick expressed some uncertainty about the color scheme of the truck, his testimony about the name on the truck should be discounted. The argument is not persuasive. Mr. Hendrick focused on the name on the truck to make sure he could identify it. His memory of that focused observation is persuasive. Mr. Casanova's efforts to create the impression that Mr. Hendrick may have observed a truck of a septic tank contractor in Collier County with the name Beebe Septic were not persuasive for a number of reasons. The reasons include the fact that the Beebe name is not painted on the trucks and the fact that nothing in the name Beebe Septic resembles the "Busy" in Busy Bee. Mr. Casanova's other efforts to undermine the testimony of Mr. Hendrick are equally unpersuasive. Clear and convincing evidence proved that on the night of June 15, 2012, individuals operating a Busy Bee truck pumped untreated septage onto the ground adjacent to Jacaranda Boulevard in Cape Coral, Florida. The odor, the presence of toilet paper, the physical characteristics of the sludge, and the fact that the Busy Bee trucks were designed and permitted for transporting untreated septage establishes by clear and convincing evidence that the septage was untreated. The Department of Health has taken disciplinary action against Carlos Casanova three times in matters resolved by settlement agreements. The agreements expressly provide for consideration of them in subsequent disciplinary actions. On February 13, 2012, the Department entered Final Order No. DOH-12-0251-FOI-HST against Carlos Casanova imposing an administrative fine in the amount of $1,000.00 to resolve charges filed October 6, 2011. On February 13, 2012, the Department entered Final Order No. DOH-12-0252-FOI-HST against Carlos Casanova imposing an administrative fine in the amount of $1,000.00 to resolve charges filed on November 18, 2011. Finally, on February 13, 2012, the Department entered Final Order No. DOH-12-0253-FOI-HST against Carlos Casanova imposing a fine in the amount of $1,500 to resolve charges filed September 14, 2011.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Health enter a final order revoking the septage collection and disposal permits of Petitioners, Carlos M. Casanova and Busy Bee Septic, Inc., and revoking the septic tank contractor registration of Carlos M. Casanova. DONE AND ENTERED this 13th day of February, 2013, in Tallahassee, Leon County, Florida. S JOHN D. C. NEWTON, II Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of February, 2013.

Florida Laws (6) 120.569120.57120.68381.0065386.041489.556
# 3
METROPOLITAN DADE COUNTY vs INDUSTRIAL EQUIPMENT AND SUPPLY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 96-005127 (1996)
Division of Administrative Hearings, Florida Filed:Miami, Florida Nov. 01, 1996 Number: 96-005127 Latest Update: Jul. 15, 1998

The Issue The issue for determination is whether Industrial Equipment and Supply, DEP Facility No. 139502056 is eligible for state- administered cleanup under the Drycleaning Solvent Cleanup Program pursuant to Section 376.3078, Florida Statutes.

Findings Of Fact Metropolitan Dade County (Petitioner) is a political subdivision of the State of Florida. Pursuant to Chapter 24, Metropolitan Dade County Code, Petitioner regulates, among other things, the use, storage, and disposal of industrial wastes and hazardous substances in Dade County. Industrial Equipment and Supply, DEP Facility No. 139502056 (Respondent Industrial) is a Florida corporation and the owner of commercial real property located at 2035-2055 Northwest 7th Avenue, Miami, Florida. At this facility site, Respondent Industrial conducts business as a wholesale supplier of drycleaning supplies. The Department of Environmental Protection (Respondent DEP) is an agency of the State of Florida. Pursuant to Chapters 20, 376, and 403, Florida Statutes, Respondent DEP, among other things, regulates and is charged with the protection of the State's surface waters, groundwater, and other natural resources. On June 29, 1993, Petitioner's Department of Environmental Resource Management (DERM) issued Respondent Industrial a Notice of Violation and Order of Corrective Action (NOV). The NOV provided that evidence of "industrial waste discharges to the ground and groundwater" and that samples collected from Respondent Industrial's monitoring well revealed levels of tetrachloroethylene, also referred to as perchloroethylene (PERC), in violation of Chapter 24, Metropolitan Dade County Environmental Protection Ordinance.2 On or about September 20, 1993, in response to the NOV, Respondent Industrial's environmental consultant, Wingerter Environmental, prepared and submitted to DERM a Contamination Assessment Plan (CAP). On November 30, 1993, the CAP was approved by DERM, and subsequently modified on January 29, 1994. The CAP provided for the installation and sampling of five monitoring wells and four soil borings, and the surveying of relevant groundwater elevations. Analytical results from the soil and groundwater sampling identified elevated levels of PERC. Based on the analytical results, in May 1994, DERM and Respondent's new environmental consultant, AB2MT, discussed the need for expanding contamination assessment activities, including the installation and sampling of additional soil borings, shallow wells and a deep well. AB2MT completed the additional installation and sampling. Analytical results from the expanded assessment identified elevated levels of PERC, vinyl chloride and trichlorethylene. In May 1994, House Bill No. 2817, the Drycleaning Solvent Contamination Cleanup Act (Drycleaning Act), passed the Florida Legislature and was submitted to the Governor for signature. The Drycleaning Act became law, Chapter 94-355, Laws of Florida, effective July 1, 1994.3 On May 8, 1994, after passage of but prior to the Drycleaning Act becoming law, Respondent DEP announced that it was suspending all enforcement actions against drycleaning and wholesale supply facilities based on the Florida Legislature's passage of the Drycleaning Act. On May 16, 1994, Respondent Industrial's expanded contamination assessment report prepared by AB2MT was verbally approved by DERM. On January 24, 1995, DERM forwarded a Final Notice Prior to Court Action (Final Notice) to Respondent Industrial. The Final Notice stated that Respondent Industrial was not in compliance with the NOV, requested that Respondent Industrial enter into an administrative consent agreement within thirty days, and indicated that the case would be turned over to the County Attorney's Office if the referenced violations were not corrected.4 On August 30, 1995, a guidance document, regarding applications under the Drycleaning Act, was issued by Respondent DEP. The guidance document stated that Respondent DEP would begin accepting applications to the state-administered program created by the Drycleaning Act upon adoption by Respondent DEP of a rule to implement the program. In a meeting on January 25, 1996, DERM informed Respondent Industrial that it had a continuing obligation to cleanup and that it possibly could be found grossly negligent for failing to conduct a cleanup. On March 13, 1996, Respondent DEP adopted the Drycleaning Solvent Cleanup Program Rules (Rules), Chapter 62- 781, Florida Administrative Code. The Rules specified eligibility requirements for applications submitted under the Drycleaning Act. On April 21, 1996, Respondent Industrial made application to Respondent DEP for acceptance into the Drycleaning Solvent Cleanup Program. On September 16, 1996, Respondent Industrial was accepted by Respondent DEP into the Drycleaning Solvent Cleanup Program, pursuant to Chapter 62-781, Florida Administrative Code. By Petition for Formal Administrative Hearing served October 4, 1996, Petitioner appealed Respondent DEP's acceptance of Respondent Industrial into the Drycleaning Solvent Cleanup Program. According to Petitioner, Respondent Industrial's willful failure to assess and remediate contamination at the site of the wholesale supply facility constitutes gross negligence, thereby precluding its eligibility in the Drycleaning Solvent Cleanup Program.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order finding Industrial Equipment and Supply, DEP Facility No. 139502056 eligible to participate in the Drycleaning Solvent Cleanup Program. DONE AND ENTERED this 5th day of May, 1998, in Tallahassee, Leon County, Florida. ERROL H. POWELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 5th day of May, 1998.

Florida Laws (7) 120.569120.57376.305376.3078376.315376.70376.75
# 4
JET-VAC SANITARY SERVICES vs. DEPARTMENT OF TRANSPORTATION, 88-003331BID (1988)
Division of Administrative Hearings, Florida Number: 88-003331BID Latest Update: Dec. 08, 1988

Findings Of Fact The Department of Transportation, pursuant to its decision to procure certain sewer line cleaning equipment, issued an Invitation to Bid to potential vendors of such equipment. The specifications in that Invitation to Bid which are at issue in this proceeding concern the specified ability of the machine being proposed to vacuum gutters while being driven or, that is, in motion. The other specification at issue was that the machine had to be a standard production model with five of such machines in service for one year prior to May 1988. The sewer line cleaner specified had to have a nine cubic yard capacity. The bids were received, including that of Vac-Con, Inc. and Jet Vac Sanitary Service. The bid results were posted on June 3, 1988, noticing the Department's intent to award the contract for the nine cubic yard sewer line cleaner to Vac- Con, Inc. Jet Vac Sanitary Service timely filed a formal protest of that intended bid award on June 17, 1988. The Petitioner's formal protest was transmitted to the Division of Administrative Hearings and duly came on for hearing. The Petitioner is contending that the Vac-Con model V290 storm sewer line cleaner does not meet the specifications in the Invitation to Bid because it will not vacuum gutters while in motion in the configuration set forth in Vac-Con's published specifications for its standard models. It asserts, in conjunction with this argument, that the alternative configuration proposed by Vac-Con would in effect render this a nonstandard production model of which Vac- Con has not had five in service prior to May 1988, which would represent a departure from the bid specifications and thus result in a non-responsive bid. The Respondent, however, contends that the alternative configuration proposed by Vac-Con is merely an options package to an existing standard production model machine and thus is in conformance with the specification. The Respondent has been advised by Vac-Con that the V290 machine will perform as specified and that at least five machines have been so configured and have been in service for the required one year or greater period. It is stipulated that Jet Vac Sanitary Service was the next lowest bidder after Vac-Con and has standing to protest the Intent to Award. Jet Vac was a responsive bidder. It is also stipulated that the configuration of the model V290 depicted in Vac-Con's promotional material itself will not meet the specifications set forth in Respondent's Invitation to Bid. The dispute is whether the Vac-Con machine, as optionally modified, as proposed by Vac-Con, meets the specification concerning the machine being a standard production model. In response to the Invitation to Bid, Vac-Con, Inc. submitted a bid for its Vac-Con model V290. It accompanied that bid with a written statement of the model specifications which coincided with the specifications required by the Invitation to Bid. It specified, that is, that it would comply with the requirement that the vehicle be able to vacuum gutters while being driven in motion. Jet Vac in turn submitted a bid which was responsive, but it was not the lowest bid. Vac-Con, Inc., in other bids submitted in the past year as well as in its advertising literature, describes the V290 model of sewer line cleaner as one in which the vacuum compressor is driven by the truck engine, that is the engine which provides the motive power to the vehicle. In order to operate the vacuum compressor as described in that literature, the rear axle of the truck has to be disengaged, with the result that the unit cannot vacuum and drive at the same time. This configuration of the V290 model which has the vacuum being operated by the truck engine or chassis engine, is the normal type of unit offered by Vac-Con in its vehicle demonstrations and literature, as recently as one week prior to trial. In order for the V290 to comply with the bid specifications at issue, it must be reconfigured so that the vacuum compressor is run by an auxiliary engine and not the motive power engine. The power available to operate the vacuum compressors which vacuum trash from gutters and so forth, would be reduced from the chassis engine which, in the normal configuration of that model, operates the vacuum compressors. The reconfiguration whereby the vacuum compressors would be run off the auxiliary engine, and not the motive engine, would require a reversal of the V-belt drives used by the normal unit. This alternate configuration would be obvious to the casual observer. The intent of the term "standard production model" in the specifications at issue is to ensure that a machine purchased will have ready availability of manufacturer's replacement parts out of stock. This serves to prevent the purchaser from having to do development work on new models which are not in standard production runs and do not have inventories of spare parts in the manufacturer's stock as yet. Because the alternate configuration of the unit, whereby it would vacuum while moving, running its vacuum equipment off of its auxiliary engine, requires new engineering and reevaluation of the power of the V290's auxiliary motor, the specification language requiring a "standard production model" and requiring that five such units be operational in the field, requires in this instance that five units in the alternate configuration at issue be found to have been in satisfactory field service for one year. The written description submitted by Vac-Con, Inc. in response to the bidding documents, describes a machine which complies with the specification requiring the ability of the machine to vacuum while it is in motion. That description was specially prepared for purposes of this bid. Indeed it is not a machine represented, at the time of the bid, in the company's advertising literature, catalog data or other published brochures and like sources of information in order to verify that indeed Vac-Con did have five units in the alternative configuration in satisfactory service. The Department's representative, Mr. Burt, telephoned individuals whose names had been supplied him by Vac-Con as being persons who could verify that the alternative, which could vacuum in motion with the vacuum blower run off the auxiliary engine, was indeed in service. Using these names supplied him by Vac-Con and names of persons some of those people in turn gave him, who had such altered machines operating in satisfactory service, Mr. Burt telephoned each of the individuals whose names had thus been furnished by Vac-Con and its customers. He thus confirmed that there were indeed at least five units in service in the field, for at least one year, which had the ability to vacuum gutters while in motion, with the vacuum equipment being operated by the auxiliary engine on the machine. The Department has a policy of relying upon the representations of its suppliers. It does not inspect each piece of equipment before it writes a purchase order after awarding a bid. It instead reserves the right to reject any piece of equipment that does not meet specifications, after purchase. The Department does not wish to get into an adversary relationship with its suppliers and, in turn, vendors typically do not want an adversary or unfavorable relationship with the Department and do not want future disqualifications from bidding based upon any lack of integrity or misrepresentations in responding to bid specifications. Accordingly, the representations made on the bidding document have historically been quite accurate and have a high degree of probability of reliability. Hence, the Department has not, in the exercise of its discretion, followed a policy of physically inspecting each piece of equipment and independently verifying its existence or capabilities. It rather has effectively, in the past, relied upon the vendor's representations regarding the capacities or capabilities of equipment. In fact, the Department has neither the staff nor the time to make any further pre-award investigations, especially due to the nationwide market and indeed, to some extent, international market, in which it seeks to procure equipment of all sorts. In any event, being satisfied that the equipment would perform as represented and verifying that at least five such configured machines were in active field service for a year or more, the Department concluded that, in the exercise of its discretion, that the specifications had been adequately responded to and that the award should be made to Vac-Con as lowest, most responsive bidder. Insufficient proof to the contrary was offered at the hearing.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is, therefore RECOMMENDED that a Final Order be entered awarding the contract for Florida DOT Bid Number MY3188B5 to Vac-Con, Inc. DONE and ENTERED this 8th day of December, 1988, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of December, 1988. COPIES FURNISHED: Ray Heath William B. Singleton Jet Vac Sanitary Services Post Office Box 186 New Smyrna Beach, Florida 32070 Bruce A. Campbell, squire Senior Litigation Attorney Office of General Counsel Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450 Kaye N. Henderson, P.E., Secretary ATTN: Eleanor F. Turner, M.S. 58 Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450

Florida Laws (4) 120.53120.57287.012337.02
# 5
DEPARTMENT OF HEALTH vs RICHARD A. SIMON, D/B/A ANYTIME SIMON`S SEPTIC SERVICE, 97-005979 (1997)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Dec. 23, 1997 Number: 97-005979 Latest Update: Jan. 19, 1999

The Issue The issue is whether Respondent is guilty of discharging untreated septage at a site that Respondent was not permitted to use, in violation of Rule 10D-6.052(7)(b), Florida Administrative Code; and operating two septic pumping trucks, even though authorized to operate only one such vehicle, in violation of Rules 10D-6.052(2)(a) and 10D-6.052(1), Florida Administrative Code; and, if so, what penalty should be imposed.

Findings Of Fact Since 1989, Respondent has been a registered septic tank contractor. Petitioner annually issues Respondent a separate permit to pump, transport, and dispose of septage. Petitioner or its predecessor has disciplined Respondent on two occasions. On November 15, 1994, Respondent paid a $500 fine after the issuance of an administrative complaint for discharging improperly treated septage, and, on August 19, 1996, Petitioner issued a final order imposing a $500 fine and 90-day suspension against Respondent for repairing a septic tank system without a permit. Respondent’s attempts to explain away these violations were unpersuasive. At the time in question, Respondent’s permits allowed him to operate only one truck in transporting septage--a 1988 Ford--and to discharge septage only at one location--Hunter Land Application Site. Respondent’s permits also required him to stabilize septage only at one location--A-1 Septic Tank Service’s Lime Stabilization Facility. On August 15, 1997, Respondent operated or caused to be operated the permitted 1988 Ford truck and another unpermitted truck for the purpose of receiving and transporting septage that Respondent had pumped from septic tanks. Respondent and one of his employees drove the loaded trucks to J. R. Brooks & Sons Ranch, where they landspread the septage that they had been transporting. They dumped at this site about 8000 gallons of raw septage containing condoms, tampons, vegetable matter, and other items of the type normally found in unscreened septage pumped from septic tanks and grease traps. Petitioner had not approved the J. R. Brooks site for discharge of septage pumped from septic tanks. The Department of Environmental Protection (DEP) had designated the J. R. Brooks site for use by Resource Tech, which transported wastewater residuals from the Dade County Municipal Treatment Plant and discharged them at the J. R. Brooks site. The permit allowed Resource Tech to discharge wastewater residuals with only minimal levels of pathogens. DEP calculates the carrying capacity of sites such as the J. R. Brooks site based on the amount of material that they receive from permitted, disclosed discharges. After learning that the J. R. Brooks site had received unpermitted discharges, DEP determined that it must close the site and find a new one due to public-safety concerns. Respondent also failed to stabilize the septage with lime prior to discharging it on the J. R. Brooks site. The purpose of adding lime to septage is to kill pathogens. The J. R. Brooks site drains through ditches into nearby wetlands. From there, runoff drains into the Estero Bay. The untreated septage discharged by Respondent presents a greater threat to wildlife and public safety than do the wastewater residuals remaining after wastewater treatment that Residual Tech was authorized to discharge at the site. At the time of the hearing, Respondent was negotiating the sale of the business, but the buyers needed to operate under Respondent’s certificate until they could qualify to obtain one. However, Respondent admitted that he had someone else available to qualify the buyers’ operation for a certificate.

Recommendation It is RECOMMENDED that the Department of Health enter a final order revoking Respondent’s certificate as a septic tank contractor. DONE AND ENTERED this 9th day of September, 1998, in Tallahassee, Leon County, Florida. ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 9th day of September, 1998. COPIES FURNISHED: Susan Mastin Scott Chief Legal Counsel Department of Health Post Office Box 9309 Fort Myers, Florida 33902-9309 John Charles Coleman Coleman & Coleman Post Office Box 2089 Fort Myers, Florida 33902 Angela T. Hall, Agency Clerk Department of Health Bin A02 2020 Capital Circle Southeast Tallahassee, Florida 32399-1703 Pete Peterson, General Counsel Department of Health Bin A02 2020 Capital Circle Southeast Tallahassee, Florida 32399-1703

Florida Laws (4) 120.57386.01386.041489.556
# 6
DEPARTMENT OF ENVIRONMENTAL REGULATION vs. JACK VAIL, D/B/A ST. GEORGE INN RESTAURANT, 87-004242 (1987)
Division of Administrative Hearings, Florida Number: 87-004242 Latest Update: Mar. 11, 1988

The Issue Whether Permit No. DO19-101251 issued to Mr. Vail on July 11, 1985 to construct and operate an on-site wastewater treatment and disposal system should be revoked?

Findings Of Fact Mr. Vail is the owner and operator of a business called the St. George Inn and Restaurant (hereinafter referred to as the "Inn"). The Inn is located at the southeast corner of the intersection of Franklin Boulevard and Pine Avenue on St. George Island, Florida. In May of 1984 Mr. Vail spoke with an employee of the Department of Health and Rehabilitative Services about obtaining a permit to construct a septic tank on his property for use by the Inn for the treatment and disposal of wastewater. Mr. Vail was instructed to submit a design of the septic tank for approval. Mr. Vail contracted with McNeill Septic Tank Company for the design and construction of the septic tank. The evidence failed to prove when Mr. Vail applied with the Department of Health and Rehabilitative Services for a permit. As of March, 1985, however, Mr. Vail had not received approval or disapproval of his application from the Department of Health and Rehabilitative Services. Mr. Vail, therefore, went to the Governor's office to seek help in getting a response. Shortly after contacting the Governor's office, the Department of Health and Rehabilitative Services informed Mr. Vail that he needed to obtain a permit from the Department and not from the Department of Health and Rehabilitative Services. On or about March 18, 1985, Mr. Vail filed an Application to Operate/Construct Industrial Wastewater Treatment and Disposal Systems (hereinafter referred to as the "Application"), with the Department. The Application was prepared by Brown and Associates Civil Engineers and Land Surveyors, Inc., Mr. Vail's engineering consultant. The Application was certified by Benjamin E. Brown, Professional Engineer. Mr. Vail signed the Application as "owner" and indicated that he was aware of the contents of the Application. In the Application, "St. George Inn Restaurant" is listed as the "Source Name." Under Part II, A of the Application, the applicant is asked to "[d]escribe the nature and extent of the project." In response to this request, the following answer was given: This project will provide a sewage disposal system for a one hundred and fifty (150) seat restaurant on St. George Island. Sizing of the septic tank system is based on 50 GPD/seat and secondary treatment will be provided by the design proposed. Under Part III, A of the Application, the applicant is asked to provide the following information and the following answers were given: Type of Industry Restaurant . . . . 3. Raw Materials and Chemicals Used Food preparation only. Normal Operation 12 hrs/day 7 days/week . . . . If operation is seasonal, explain This restaurant will be used the most during the summer months which corresponds with ocean/beach recreation & the tourist trade. Nowhere in the Application is it indicated that the permit applied for involved anything other than a restaurant. The Application gives no information from which the Department could have known that the proposed wastewater treatment and disposal system would handle waste from guest rooms or an apartment. In the Application Mr. Vail sought approval of a permit to construct and operate a wastewater treatment and disposal system to serve a 150 seat restaurant. In the Application Mr. Vail sought a permit for a system which was to have a design flow of 7,500 gallons per day based on 50 gallons, per seat, per day water usage. An employee of the Department wrote a memorandum dated May 5, 1985, recommending approval of the Application. The Department determined, however, that the size of the property on which the Inn was to be located was not large enough for the drain field necessary to accommodate a 150 seat restaurant. Therefore, Mr. Brown modified the proposed system and resubmitted application data indicating that a 108 seat restaurant would be constructed. The design flow of the new proposal was 2,160 gallons per day based on 20 gallons per seat per day. Mr. Brown had requested that the Department approve a system based upon the newly submitted design flow. The Department and Mr. Brown both agreed that this design flow was adequate; that it was reasonable to anticipate and provide for the treatment and disposal of a maximum of 2,160 gallons per day design flow. The effect of reducing the design flow and the number of seats was to allow a shortened drain field which could be accommodated by the size of the property the Inn was to be located on. On June 27, 1985, Mr. Vail arranged for a notice to be published in the Apalachicola Times. That notice provided, in pertinent part, the following: State of Florida Department of Environmental Regulation Notice of Proposed Agency Action on Permit Application The department gives notice of its intent to issue a permit to Jack Vail to construct a restaurant and on-site wastewater treatment and disposal system [sic] at Franklin Boulevard and Pine Avenue, St. George Island. The treatment consists of grease trap, septic tank, and sand filter followed by disposal into a drainfield. The project meets applicable standards and will not impair the designated use of the underlying ground water. There is no anticipated impact on surface waters or air quality. . . . . This notice was sent to Mr. Vail by the Department and he made arrangements for it to be published. Nowhere in the notice is it indicated that the system to be approved by the Department is for anything other than a restaurant. On July 11, 1985, less than four months after the Application was filed with the Department, the Department issued Permit Number DO19-101251 (hereinafter referred to as the "Permit"). In the cover letter sent with the Permit the Department indicated that the Permit allowed Mr. Vail "to construct and operate a 2,160 gallon per day, on-site wastewater treatment and disposal system serving St. George Inn Restaurant. . . ." The Department also indicates in the Permit that it is for the "St. George Inn Restaurant." The Permit also provides, in pertinent part, the following with regard to the purpose of the Permit: The above named applicant, hereinafter called Permittee, is hereby authorized to perform the work or operate the facility shown on the application and approved drawing(s), plans, and other documents attached hereto or on file with the department and made a part hereof and specifically described as follows: Construct and operate a 108 seat restaurant with an on-site wastewater treatment and disposal system. Wastewater flows shall be a maximum of 2,160 gallons per day generated by domestic facilities and kitchen wastes . . . Construction shall be in accordance with application dated March 18, 1985 and additional information submitted April 29, 1985, specifications and other supporting documents prepared by Brown and Associates and certified by Benjamin E. Brown, P.E. and submitted to the Department on June 5, June 17, and June 20, 1985. The Permit also contains the following "General Condition" number 2 and "Specific Condition" number 15: . . . . 2. This permit is valid only for the specific processes and operations applied for and indicated in the approved drawings and exhibits. Any unauthorized deviation from the approved drawings, exhibits, specifications, or conditions of this permit may constitute grounds for revocation and enforcement action by the department. . . . . 15. The Department shall be notified and prior approval shall be obtained of any changes or revisions made during construction. . . . . The Permit provides the following with regard to the effect of the conditions of the Permit: The terms, conditions, requirements, limitations, and restrictions set forth herein are "Permit Conditions", and as such are binding upon the permittee and enforceable pursuant to the authority of sections 403.161, 403.727, or 403.859 through 403.861, Florida Statutes. The permittee is hereby placed on notice that the Department will review this permit periodically and may initiate enforcement action for any violation of the "Permit Conditions" by the permittee . . . . During the week after the Permit was issued, Mr. Vail obtained a building permit from Franklin County for the construction of the "inn." In February, 1986, after construction of the Inn had begun, Department inspectors went to the construction site of the Inn. The Permit authorized this inspection and other inspections carried out by the Department. The Department determined that the Inn being constructed by Mr. Vail included a restaurant, an apartment on the third floor of the Inn with two bathrooms, and eight guest rooms on the second floor, each containing a bathroom. This was the first time that the Department knew that Mr. Vail's facility was to include guest rooms and living quarters in addition to containing a 108 seat restaurant. In March of 1986, the Department sent a warning letter to Mr. Vail notifying him of the violation of the General Conditions of his Permit: the use of the approved system for the treatment and disposal of wastewater from the ten bathrooms in the guest rooms and the two bathrooms in the apartment in addition to the 108 seat restaurant. On April 1, 1986, Department personnel met with Mr. Vail and Mr. Brown. The Department reminded Mr. Vail and Mr. Brown that the Permit requested and approved by the Department was for a 108 seat restaurant only. The Department had not authorized a system which was to be used for a 108 seat restaurant and ten additional bathrooms. Pursuant to General Condition 14, the Department informed Mr. Vail that it needed an engineer's evaluation of the ability of the system which had been approved to handle the additional flow which could be expected from the additional ten bathrooms. By letter dated April 1, 1986, the Department memorialized the meeting and indicated that Mr. Vail could operate a 100 seat restaurant and the apartment during the interim. By letter dated May 8, 1986, Mr. Brown asked for additional time to submit the evaluation requested by the Department. The Department approved this request by letter dated May 14, 1986. By letter dated May 16, 1986, Mr. Brown submitted an engineering evaluation which proposed modifications to the approved system to handle the additional ten bathrooms. By letter dated June 13, 1986, the Department indicated that the evaluation was generally acceptable" but requested additional information. In January, 1987, before the additional information was submitted, Mr. Brown died in an airplane accident. No evidence was presented to explain why the information requested by the Department in June of 1986 had not been submitted before January, 1987. In March, 1987, the Department inspected Mr. Vail's facility again. In April, 1987, the Department informed Mr. Vail that the Department would take action to revoke the Permit. Before the Administrative Complaint was issued, the Department requested that certain information be provided on behalf of Mr. Vail by an engineer in an effort to resolve the dispute. Mr. Vail did not, however, obtain the services of an engineer. Instead, Mr. Vail sent the Department information purporting to show the amount of water which had been used at the Inn. That information failed to prove the ability of the system that the Department had approved to handle the maximum wastewater which could be expected from maximum use of the 108 seat restaurant and ten additional bathrooms. At best, the information submitted by Mr. Vail is partial proof that the system is capable of handling the wastewater that has been generated at the Inn for the period of time for which the information relates. No competent substantial proof has been submitted to indicate that the system is capable of handling the maximum wastewater flows which may be experienced or even that the system is adequately handling the current flow. All that has been proved is that there is no apparent problem with the system in handling the current flow. In September, 1987, the Department issued the Administrative Complaint. Pursuant to this Complaint, the Department has sought the revocation of the Permit and prescribed certain orders for corrective action. No application has been submitted by or on behalf of Mr. Vail to the Department to construct and operate a wastewater treatment facility designed to accommodate the sewage flows which may be generated by the Inn as it has been constructed. Although the Department of Health and Rehabilitative Services and other agencies were aware that the Inn includes a restaurant and guest rooms, the Department was never so informed.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department issue a Final Order requiring that Mr. Vail comply with all of the corrective orders, except Paragraph 18, contained in the Administrative Complaint. DONE and ORDERED this 11th day of March, 1988, in Tallahassee, Florida. LARRY J. SARTIN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of March, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NUMBER 87-4242 The parties have submitted proposed findings of fact. It has been noted below which Proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. The Department's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact of Acceptance or Reason for Rejection 1 Conclusion of law. 2 1. 3 6. 4 10. 5 12 and 13. 6 14. 7 15. 8 18. 9 19. 10 20. 11-12 16. 13 21. 14 23. 15 24. 16 25. 17 26. 18-19 27. 20 28. 21 29 22 Hereby accepted. Mr. Vail's Proposed Findings of Fact 1A 15. Not supported by the weight of the evidence and irrelevant. Hearsay and irrelevant. Although technically true, this is not the issue in this case. The evidence did not prove that the system "can in actuality handle three times the amount permitted." Not supported by the weight of the evidence and irrelevant. 2A Not supported be the weight of the evidence. Exhibit 6 indicates that the Department was aware that the Inn included "hotel rooms" but not the number. Irrelevant. The evidence did not prove that the Department was aware of the scope of the project. Not supported by the weight of the evidence. 3A Irrelevant. Not supported by the weight of the evidence and irrelevant. Even if this were true, the fact remains that the Department was unaware that the Inn included guest rooms or an apartment. Irrelevant. 4A-B Irrelevant. 5A-B Irrelevant. 6A 2-4. B 5. 6 and 11. Not supported by the weight of the evidence. See 12. 13 and 15. Not supported by the weight of the evidence and irrelevant. Not supported by the weight of the evidence. 7A-C Not supported by the weight of the evidence and irrelevant. 8A-D Not supported by the weight of the evidence and irrelevant. 9A-B Not supported by the weight of the evidence and irrelevant. 10-12 Not supported by the weight of the evidence and irrelevant. COPIES FURNISHED: Richard L. Windsor, Esquire State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Mr. John Vail St. George Inn Post Office Box 222 St. George Island, Florida 32328 Dale Twachtmann, Secretary State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire General Counsel State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (5) 120.57403.121403.161403.859403.861
# 7
DRYCLEAN USA OF FLORIDA, INC. (NO. 139502287) vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 97-000448 (1997)
Division of Administrative Hearings, Florida Filed:Miami, Florida Jan. 31, 1997 Number: 97-000448 Latest Update: Apr. 02, 1998

The Issue Whether the Petitioner's application to participate in the Drycleaning Solvent Cleanup Program with regard to its Kendale Lakes facility should be granted or denied.

Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of this proceeding, the following findings of fact are made: The Department of Environmental Protection is the state agency responsible for administering the Drycleaning Solvent Cleanup Program set out in Section 376.3078, Florida Statutes (1995). Dryclean USA is a Florida corporation and is the owner of commercial real property located at 14099 Southwest 88th Street in Miami, Florida. Dryclean USA is an operator of a drycleaning facility at that location, as those terms are defined in Sections 376.301(8) and (21), Florida Statutes. The facility, known as the Kendale Lakes facility, has been operated by Dryclean USA as a drycleaning facility for approximately twenty years. Drycleaning establishments use solvent in the cleaning process. Tetrachloroethylene, also known as perchloroethylene, is a commonly used drycleaning solvent and is considered a hazardous substance. Tetrachloroethylene is saturated in water at 150,000 parts per billion. The drycleaning process produces lint that can contain tetrachloroethylene; contact water, which is water that has, at some point during the drycleaning cycle, come into contact with tetrachloroethylene; and sludge from the mechanism that separates pure tetrachloroethylene from water and solid materials produced during the drycleaning process. In addition, tetrachloroethylene accumulates in the filters used in the drycleaning machine. These substances must be disposed of as hazardous waste. Steiner Atlantic Corporation is one of the largest distributors of drycleaning equipment in the country, and Dryclean USA purchases its equipment from this company. The drycleaning machine in the Kendale Lakes facility was purchased from Steiner Atlantic and has been in use at the Kendale Lakes facility since 1991. The machine is a third-generation machine that uses closed-loop technology. Tetrachloroethylene is introduced into the system from a pressurized container that is connected to the drycleaning machine through quick-disconnect valves. The tetrachloroethylene is pumped directed into the machine so that it does not come into contact with the air. Once the cleaning cycle is completed, tetrachloroethylene and water are extracted from the clothes, heated, and turned into a vapor. The vapor is routed across condensing coils that chill the vapor and turn it back into a liquid. The liquid goes into a separator, where the tetrachloroethylene and the water are separated; the tetrachloroethylene is returned to the drycleaning machine and the water, called separator water, is collected in a hazardous waste drum, which is hauled off the site by a company which is licensed to dispose of hazardous waste. Steiner Atlantic develops training programs for its customers and for a number of years has worked with Dryclean USA to develop training programs for Dryclean USA managers and employees. The Dryclean USA training programs are among the most extensive programs that Steiner Atlantic has developed and rank among the best in the country. The training for Dryclean USA managers both now and in 1995 consists of an intensive three-week program. In addition to courses on how to manage the business, Dryclean USA managers are trained in the operation and maintenance of all the equipment in the drycleaning facility, including the drycleaning machine, and in the legal requirements for handing hazardous waste. The program also includes training in environmental and safety issues, as well as hands-on instruction on the proper handling of tetrachloroethylene and equipment that comes into contact with tetrachloroethylene. Managers are provided with on-going training in addition to the initial training program. Dryclean USA also has a training program in hazardous waste management for all of its employees, and this program was in place in 1995. All of Dryclean USA's employees receive this training from in-house training personnel or from district managers, and the employees must read a training manual, watch a video, and pass several tests that deal with handling hazardous waste. The employees are taught that tetrachloroethylene and substances contaminated with tetrachloroethylene must be disposed of in hazardous waste containers, which are then hauled away and disposed of by a hazardous waste disposal company. Managers at the Dryclean USA facilities are responsible for ensuring that tetrachloroethylene and substances contaminated with tetrachloroethylene are disposed of properly. All Dryclean USA employees receive training in handling spills of tetrachloroethylene and substances contaminated with tetrachloroethylene, although the manager is the person responsible for ensuring-that spills are handled correctly and in accordance with the following procedures. First, all employees who will not participate in cleaning up the spill are evacuated from the premises. Certain designated employees, including the manager, use the spill kit provided in each facility to contain and absorb the spill. The spill kit consists of safety equipment for the employees handling the spill and of absorbent cloth, such as comforters or blankets, to absorb the tetrachloroethylene. The cloth used to absorb the spill is put through the drycleaning cycle to extract the tetrachloroethylene. Dryclean USA requires that all spills, no matter how small, be immediately reported to the Dryclean USA maintenance department, which promptly dispatches an engineer to assist with the spill if it is the result of an equipment malfunction. Additionally, the employees are required to keep internal records of any spill that is less than one quart and to report to the state any spill in excess of one quart. These procedures are set out both in the Dryclean USA Written Hazard Communication Program manual provided to all employees and in the Dryclean USA Emergency Contingency Plan posted on the bulletin board at each Dryclean USA facility. No spills were reported at the Kendale Lakes facility in April or May 1995. In addition to the training given to managers and other employees, the maintenance manager of Dryclean USA is also the environmental officer, and he performs semi-annual audits of each facility operated by Dryclean USA with respect to health, safety, and environmental standards. During these audits, the environmental officer ensures that the employees of each facility are aware of the procedures for the routine collection and disposition of substances contaminated with tetrachloroethylene and of the emergency contingency plan for handling spills of tetrachloroethylene and substances contaminated with tetrachloroethylene. No deficiencies were found at the Kendale Lakes facility during the 1995 audits. In 1994, the soil and groundwater at the Kendale Lakes facility was found to be contaminated by tetrachloroethylene. At that time, Dryclean USA was leasing the property, but, upon learning of the contamination, it purchased the property. Dryclean USA notified DERM of the contamination, and, in the spring of 1994, it retained the U.S. Environmental Group, an environmental consulting firm that, among other things, performs contamination assessments and develops and institutes remediation plans for sites contaminated with tetrachloroethylene. U.S. Environmental Group prepared a contamination assessment report delineating the area of contamination in the soil and groundwater around the Kendale Lakes facility. It also developed and implemented an interim remedial measures plan for both soil and groundwater contamination. Neither DERM nor U.S. Environmental Group nor any other agency or entity has identified the source of the contamination at the Kendale Lakes site. When U.S. Environmental Group began its assessment of the contamination in 1994, it did not find any discharge occurring from the drycleaning system in place at that time and so concluded that the contamination was historical. DERM assigned Nicholas Simmons as project manager for the Kendale Lakes site. In the spring of 1995, Mr. Simmons held the position of Hydrogeologist II in DERM's hazardous waste remediation program. His primary responsibilities in this position were to review contamination assessment reports, remedial action plans, and other documents relating to contaminated sites in Dade County and to make recommendations as to whether the reports and plans should be approved or disapproved. He was project manager for a number of sites contaminated with drycleaning solvents. Before he became a Hydrogeologist II with DERM, Mr. Simmons was a Pollution Control Inspector I with that agency, and his responsibilities included making field inspections of industrial facilities in Dade County, including drycleaning establishments. During his time as a pollution control inspector, Mr. Simmons visited approximately 20 to 30 drycleaning sites, although he did not personally inspect all of them. On April 28, 1995, Mr. Simmons made a visit to the Kendale Lakes facility in his capacity as DERM project manager to observe U.S. Environmental Group install a new monitoring well inside the facility. While at the facility, Mr. Simmons decided to make a cursory inspection to see if he could locate a source of the contamination at the site. He was unsuccessful in this respect, but he found several "items of concern" at the facility, none of which constituted a violation of any federal, state, or local laws, rules, or regulations or involved a discharge of tetrachloroethylene into the soil or groundwater. One "item of concern" he identified during his April 28 inspection was what appeared to be a leak from a pipe connected to the drycleaning machine. The liquid dripping from the pipe was clear and was dripping into a three-gallon bucket. Mr. Simmons did not take a sample of the liquid to determine if it was contaminated with tetrachloroethylene, nor did he observe the method of disposal of the liquid. The temporary manager, who was manager at the Kendale Lakes facility only one day per week, told him that he presumed the liquid was disposed of as hazardous waste. Mr. Simmons prepared a memorandum dated April 28, 1995, to Mark Pettit, a DERM code enforcement officer, in which he reported in detail the inspection, the observations he made, and the conversations he had with Dryclean USA employees during his visit to the Kendale Lakes facility on that date. Mr. Simmons visited the Kendale Lakes site again on May 2, 1995, to observe U.S. Environmental Group install equipment for a soil vapor extraction pilot test. Mr. Simmons took the opportunity to re-inspect the facility. Monica Resconi, the manager of the Kendale Lakes facility, was present during this inspection. In addition, Eddie Rodriguez, then-president of Dryclean USA, was present during most of the May 2 inspection. Mr. Simmons observed that clear liquid was still dripping from the pipe connected to the drycleaning machine into a small bucket. Mr. Simmons asked for and received permission from Ms. Resconi and Mr. Rodriguez to take a sample of the liquid in the bucket, and he submitted it for testing to the DERM laboratory. The laboratory analysis established that the sample contained 220.5 parts per billion of tetrachloroethylene. Mr. Simmons did not ask Ms. Resconi or Mr. Rodriguez how this liquid was disposed of, and he did not observe anyone actually disposing of the liquid. During Mr. Simmons' May 2 visit to the Kendale Lakes facility, he also observed a whitish liquid in a drum labeled "Hazardous Waste" that was located close to the drycleaning machine. A hose connected the drycleaning machine and the drum, but Mr. Simmons did not know whether there was liquid traveling through the hose or whether liquid would travel from the machine to the drum or vice versa. He also observed what appeared to be the same liquid in a puddle on the floor. He asked Ms. Resconi what the liquid was, and she put her hand into the puddle and identified the liquid as water. She wiped it up with a rag. Mr. Simmons did not observe her disposing of the rag, and he did not take a sample of either the liquid in the drum or the liquid on the floor. When Mr. Simmons showed Mr. Rodriguez the dripping liquid he had first observed on April 28 and the area where he had observed the puddle of whitish liquid, Mr. Rodriguez immediately called the maintenance manager for Dryclean USA, and a maintenance technician and the maintenance supervisor were promptly sent to the Kendale Lakes facility. They reported to the maintenance manager that the liquid dripping from the pipe was water that had condensed on the outside of a refrigerator pipe because some of the insulation was missing. They also reported that there were no other leaks from the drycleaning machine. When he inspected the machine the following day, the maintenance manager found that the insulation on the pipe had been replaced and that the pipe was no longer dripping. He also found no other leaks in the drycleaning machine. Finally, Mr. Simmons observed a yellow bucket just inside the back door of the facility during his May 2 inspection. The bucket contained dirty water and a mop with a green handle. He asked Ms. Resconi what the bucket contained, and she explained that it was water that had been used to mop the floor of the facility. When he asked how this water was disposed of, Ms. Resconi stated that it was thrown out the back door. Mr. Simmons asked for and received permission from Ms. Resconi and Mr. Rodriguez to collect a sample of the water in the bucket, but the sample he took was not acceptable for analysis and was discarded. For some time prior to Mr. Rodriguez's meeting with Mr. Simmons, Dryclean USA's policy regarding the disposal of mop water required that water used to mop the front, or store area, of the facility be discarded down the toilet and that water used to mop the back area of the facility where the drycleaning equipment was located be discarded in hazardous waste containers. When Mr. Simmons told Mr. Rodriguez on May 2 that he was concerned that the water in the mop bucket might contain tetrachloroethylene, Mr. Rodriguez responded by directing Ms. Resconi to dispose of all mop water in the hazardous waste containers. Mr. Simmons prepared a memorandum dated May 2, 1995, to Mark Pettit, a DERM code enforcement officer, in which he reported in detail the inspection, the observations he made, and the conversations he had with Dryclean USA employees during his visit to the Kendale Lakes facility on that date. In accordance with Mr. Simmons' recommendation, a detailed inspection of the Kendale Lakes facility was ordered. On May 11, 1995, Heather Wright, an inspector with DERM's hazardous facilities section, visited the facility to perform this inspection. Ms. Resconi was not at the facility, but Ms. Wright met with Brad Clayton, the temporary manager at Kendale Lakes, and with Steve Lundy, Dryclean USA's district manager responsible for the Kendale Lakes facility. Ms. Wright made a detailed inspection of the facility on May 11, 1995, and found that the floor around the drycleaning machine was dry and that there was no evidence of leaks from the drycleaning machine. Mr. Lundy discussed with Ms. Wright the procedure for cleaning up spills of tetrachloroethylene or substances known to be contaminated with tetrachloroethylene, and he told her that spills were picked up with absorbent cloth, which was then put into the drycleaning machine to extract the tetrachloroethylene from the cloth. He also told her that any other materials known to be contaminated with tetrachloroethylene were disposed of in hazardous waste druMs. Ms. Wright questioned Mr. Lundy on the method of disposing of water in the mop bucket, which was located just inside the back door of the facility. He told her that it was thrown out the back door of the facility, but he also told her that spills were not cleaned up with the mop, which was used only to mop the floors of the facility. Ms. Wright collected a sample of the water in the mop bucket and submitted it to the DERM laboratory for testing. The laboratory analysis established that the sample contained 121,928 parts per billion of tetrachloroethylene, an amount close to saturation.3 Ms. Wright did not observe the manner in which the employees of the Kendale Lakes facility disposed of the water in the mop bucket. Ms. Wright prepared an Incident Report dated May 11, 1995, in which she reported in detail the inspection, the observations she made, and the conversations she had with Dryclean USA employees during her visit to the Kendale Lakes facility on that date. When Mr. Rodriguez learned that the sample of water taken from the mop bucket at the Kendale Lakes facility contained almost 122,000 parts per billion of tetrachloroethylene, he instituted a new policy regarding the handling of mop water at all Dryclean USA facilities. Pursuant to a memo dated June 8, 1995, the new procedure requires that two mop buckets be maintained in each Dryclean USA facility, one to be used exclusively for mopping in the front "store" portion of the facility and one to be used exclusively for mopping in the back of the facility where the drycleaning equipment is located. The bucket used for mopping the back of the facility must be red, and the mop used must have a red handle. The water in the bucket used to mop the front of the facility must be discarded into the toilet, and the water in the red bucket, as well as the mop heads, must be disposed of as hazardous waste. According to samples taken by U.S. Environmental Group in November 1996, the level of tetrachloroethylene in samples of groundwater taken from Monitoring Well Number 2, located just outside the back door of the Kendale Lakes facility, was 499 parts per billion, a very small amount but one which was significantly higher than the samples taken from other monitoring wells at the Kendale Lakes site. This indicates that there has been a discharge of tetrachloroethylene in the vicinity of the back door of the facility, but the contamination in this area is in the form of pockets of pure tetrachloroethylene in the soil under the asphalt in the back of the facility. This is not consistent with the discharge of tetrachloroethylene that is dissolved in water. From 1994, when it began working at the Kendale Lakes facility, until the present, U.S. Environmental Group has found no indication of additional or increased contamination from tetrachloroethylene at the Kendale Lakes facility. On April 1, 1996, Dryclean USA applied to the Department for a determination that its Kendale Lakes facility was eligible to participate in the Drycleaning Solvent Cleanup Program. As part of its review process, the Department requested that DERM provide answers to certain questions relating to the Kendale Lakes facility. One of the questions was whether DERM was aware of any "willful" discharge of contaminated materials at the Kendale Lakes site; DERM answered "Unknown." Also in response to the Department's inquiries, DERM provided the Department with materials that included the inspection reports submitted by Mr. Simmons and Ms. Wright in late April and early May 1995 and the laboratory analysis of the mop water sample taken by Ms. Wright on May 11, 1995. The Department relied on the information received from DERM in reviewing the application. In a letter dated August 2, 1996, the Department notified Dryclean USA that its application for the Kendale Lakes facility was denied because it had determined that Dryclean USA had willfully discharged drycleaning solvents "onto the soils or into the waters of the State." The sole basis for this conclusion was the information in Mr. Simmons' and Ms. Wright's reports that Ms. Resconi and Mr. Lundy stated during the inspections on May 2 and May 11, respectively, that the water in the mop bucket found beside the back door of the facility was routinely thrown out of the back door and on the laboratory results showing that the sample of water taken from the mop bucket on May 11, 1995, contained approximately 122,000 parts per billion of tetrachloroethylene. The parties have stipulated that, except for the issue of whether there has been a willful discharge of drycleaning solvent at Dryclean USA's Kendale Lakes facility subsequent to November 1, 1980, the application at issue in this proceeding satisfies all of the statutory criteria to establish Dryclean USA's eligibility to participate in the Drycleaning Solvent Cleanup Program for that facility. The evidence presented by the Department is not sufficient to support a finding that there were willful discharges of drycleaning solvent at the Kendale Lakes facility subsequent to November 19, 1980. The evidence does not establish that spills of tetrachloroethylene and substances contaminated with tetrachloroethylene were routinely cleaned up with a mop and the mop water discharged out the back door of the Kendale Lakes facility. Dryclean USA's employees received extensive training in the proper disposal of hazardous waste and the proper method for handing spills of tetrachloroethylene and substances contaminated with tetrachloroethylene, and its managers were given additional training that included information on the legal and environmental aspects of tetrachloroethylene contamination. There was no plausible reason suggested by the evidence for Ms. Resconi to flout the policies and procedures established by her employer. Furthermore, the evidence presented by the Department is simply too tenuous to establish, as the Department proposes, that Ms. Resconi admitted to Mr. Simmons that spills of tetrachloroethylene and substances contaminated with tetrachloroethylene were routinely cleaned up with a mop and the mop water discharged out the back door of the Kendale Lakes facility.4 At most, the evidence establishes that water used to mop the floor of the Kendale Lakes facility was most likely discharged out the back door until May 2, 1995, when Mr. Rodriguez directed Ms. Resconi to dispose of all mop water at the facility in the hazardous waste containers, and that, on May 11, 1995, the water in the mop bucket contained a significant amount of tetrachloroethylene. There is no evidence that Dryclean USA or its employees knew that the water in the mop bucket on May 11, 1995, contained tetrachloroethylene or that the water in the mop bucket on May 11, 1995, was discharged out the back door of the facility or that any mop water containing tetrachloroethylene was discharged out the back door of the facility. In fact, the uncontroverted evidence is that there has been no increase in the level of tetrachloroethylene contamination at the Kendale Lakes facility since at least 1994.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection issue a Final Order granting the Drycleaning Solvent Cleanup Program Application submitted by Dryclean USA of Florida, Inc., for its facility located at 14099 Southwest 88th Street, Miami, Florida. DONE AND ENTERED this 2nd day of January, 1998, in Tallahassee, Leon County, Florida. PATRICIA HART MALONO Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of January, 1998.

Florida Laws (5) 120.57376.301376.3078376.70376.75