RICHARD L. HENSCH vs DEPARTMENT OF TRANSPORTATION, 89-006714 (1989)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Dec. 05, 1989 Number: 89-006714 Latest Update: Jun. 14, 1990

Findings Of Fact Petitioner Richard L. Hensch submitted to the Department of Transportation (DOT) an Airport Site Approval and License Application dated December 8, 1987, for a private seaplane base on Lake Fairview in Orange County. On the application, Mr. Hensch indicated that flight activities that would be conducted from the proposed site could be sight-seeing flights, seaplane rides and tours and occasional seaplane instruction. Mr. Hensch plans to offer these activities to the public and charge fees for them. Attached to the Application was a letter dated December 17, 1987, from Ms. Sharon Smith, the Orange County Zoning Director, in which she states: Please be advised that insofar as Orange County Zoning requirements are concerned, our department has no jurisdiction over the use of water bodies of lakes; rather such use falls under the jurisdiction of the State of Florida. This letter was written at the request of the Petitioner. While the above-referenced application was under consideration by DOT, Petitioner applied for and received from the County tentative approval for an occupational license for his proposed operation. F.A.A. airspace determination approval letter for the proposed site was dated June 1, 1989. A Notice of Intent about the "proposed Private Seaplane Base" was issued by the Department of Transportation on June 21, 1989. A public meeting in connection therewith was conducted on August 28, 1989. Bronson Monteith, working for the DOT in Orange County, conducted the public meeting and recommended site approval relying on the letter by Orange County, dated December 17, 1987, as to the zoning. The Orange County Commission at its meeting held on August 14, 1989, objected to the placement of a seaplane base at Lake Fairview based on a determination by the zoning director and the county attorney's office that the proposed seaplane base did not comply with the zoning ordinance. The Lake Fairview area property is zoned predominantly residential, R- 1A, R-1AA with some C-2, R-T and R-3 zoning within the lake. Included within the commercial-type operations along and on the lake are jet-ski, sailboat and other watercraft rentals. Airports can be located only by special exception in A1 and A-2, agricultural zoning districts, and are permitted outright in I-5, Industrial Airport Zoning District. None of the lake area or shoreline areas are zoned A-1, Z-2 or I-5. During August of 1989, the Assistant Zoning Director, Joanne McMurray, who as Acting Zoning Director, received a memorandum from Mr. Hartman, Acting Director of the County's Administrative Services Office, about the seaplane base proposal whereby she researched the zoning regulations as to airport facilities and zoning districts and permitted uses. She determined the proposed seaplane site would not comply with the Orange County zoning requirements. Ms. McMurray had received information from the county legal department that Zoning had jurisdiction to govern the use of lakes. Lacy Moore, DOT's Chief of Airport Inspection, indicated that licensing followed site approval and was subject to annual renewal. Licensing was subject to revocation or denial of renewal if zoning changes occurred that made the airport out of compliance with zoning. DOT sought clarification from the County as to whether the proposed site was in compliance with the Orange County zoning regulations. Phillip N. Brown, Orange County Administrator, sent a letter to Mr. Moore dated October 30, 1989, advising that the proposed seaplane site was not a permitted use in the County zoning district for Lake Fairview. As a result of Mr. Brown's letter, Petitioner's application was denied on November 1, 1989, based on failure to comply with local zoning requirements. An "airport" is defined by the Orange County Zoning Ordinance as "any area of land or water designated and set aside for the landing and taking off of aircraft and utilized or to be utilized in the interest of the public for such purpose." No amendments to the zoning ordinance or zoning district map have been enacted since the filing of Petitioner's Application of December 8, 1987. On or about November 11, 1988, Ms. Smith, Orange County Zoning Director, by letter, stated that there were no zoning regulations in force in connection with another unrelated application for site approval and licensure of a private seaplane base on Big Sand Lake in Orange County, Florida. Licensed private airports have been authorized by DOT to provide services to the public such as airplane rides and flight instruction and charge fees. At the formal hearing held on this matter, several residents of the Lake Fairview area expressed opposition to the proposed seaplane site and indicated their concerns as to noise and safety because of extensive activity on the lake. Some people spoke in favor of the seaplane base indicating operational safety. Members of the public, including lake residents and others who spoke at the hearing, were not under subpoena by either party.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is recommended that a Final Order be entered by the agency head denying site approval for a private seaplane base on Lake Fairview in Orange County, Florida, because it does not comply with applicable county zoning as required by law. DONE AND ENTERED this 14th day of June, 1990, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of June, 1990. APPENDIX TO RECOMMENDED ORDER, CASE NO. 89-6714 The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on findings of fact submitted by the parties. Petitioner's Proposed Findings of Fact: Accepted in substance: Paragraphs 1,2,3,4,5,6,7,9,10 (discussed in Preliminary Statement). Rejected as argument: 8,11. Respondent's Proposed Findings of Fact: Accepted in substance: 1,2,3,4,5 COPIES FURNISHED: Vernon L. Whittier, Jr., Esquire Department of Transportation Haydon Burns Building 605 Suwannee Street, MS 58 Tallahassee, Florida 32399-0458 Brian D. Stokes, Esquire Post Office Box 538065 Orlando, Florida 32853-8065 Ben G. Watts Secretary Department of Transportation 605 Suwannee Street Tallahassee, Florida 32399-0450 Attn: Eleanor F. Turner, MS 58 Thornton J. Williams General Counsel Department of Transportation 562 Haydon Burns Building Tallahassee, Florida 32399-0450

Florida Laws (4) 120.57330.27330.30330.36
# 1
CLYDE TOWNSEND AND MRS. CLYDE TOWNSEND vs. PLANMAC COMPANY, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 86-000107 (1986)
Division of Administrative Hearings, Florida Number: 86-000107 Latest Update: Apr. 23, 1986

Findings Of Fact On March 12, 1985, Applicant filed a request with the Department for a permit to construct a marina in a manmade basin (Captain's Cove) located on Lower Matecumbe Key, Monroe County, Florida. The permit sought by the Applicant, as modified, would allow it to construct a 52-slip docking facility consisting of two 5' x 248' docks, each with fourteen 3' x 40' finger piers and twelve associated mooring piles; and, approximately 590 linear feet of riprap revertment requiring the disposition of approximately 300 cubic yards of rock boulders landward and waterward of mean high water (MHW). All docks and finger piers would be constructed of prestressed concrete supported by concrete piles; mooring piles would be pressure treated wood. The Applicant proposes to organize the facility as a condominium development; however, live-aboard use will be prohibited. A manager's quarters, office, restrooms and a parking area will be provided on the adjacent uplands. The Department's October 3, 1985, notice of intent to issue, proposed to issue the requested permit subject to the following condition: The permittee is hereby advised that Florida law states: "No person shall commence any excavation, construction, or other activ- ity involving the use of sovereign or other lands of the state, title to which is vested in the Board of Trustees of the Internal Improvement Trust Fund or the Department of Natural Resources under Chapter 253, until such person has received from the Board of Trustees of the Internal Improvement Trust Fund the required lease, license, easement, or other form of consent authorizing the proposed use." If such work is done without consent, a fine for each offense in an amount of up to $10,000 may be imposed. Turbidity screens shall be utilized and properly maintained during the permitted construction and shall remain in place until any generated turbidity subsides. Only non-commercial, recreational boats shall be allowed to use the proposed marina. The applicant shall incorporate this condition into the condominium document for the proposed marina and supply the Department with a copy of the document prior to any sales of the condominium. No live-aboard boats shall be allowed in the marina. This condition shall also be placed in the condominium document. A portable sewage pumpout wagon shall be provided at the marina. Pumpout effluent shall be properly disposed of by methods acceptable to the department; these methods and locations shall be approved by the department prior to construction. A supply of oil absorbent materials, designed to clean up small oil spills, shall be maintained at the marina office. At least sixty (60) days prior to construction, the applicant shall submit to the Punta Gorda DER office for review, a detailed list of equip- ment to be permanently maintained on site. This list of equipment shall be modified as necessary and approved by the department prior to construction. The uplands on the permittee's property shall be graded to direct stormwater away from the edge of the boat basin. No fuel facilities nor storage shall be allowed at the project. Only clean rock boulders free from attached sediments or other deleterious compounds, and of a minimum diameter of 2' or greater shall be installed as riprap. 1O. The Marathon Department of Environmen- tal Regulation office shall be notified 48 hours prior to commencement of work. "IDLE SPEED-NO WAKE" signs shall be placed at conspicuous locations at the docking facility with additional language that "this precaution exists throughout the length of the canal channel during ingress and egress". At least two trash receptacles shall be provided on each of the two main walkway piers: these receptacles shall be routinely maintained and emptied. Prior to dockage use by boats, marker buoys shall be established around all vege- tated shallow zones within the limits of the submerged property limits with signs advising boaters of "SHALLOW WATERS-NO ENTRY". Prior to construction, the applicant and the Mara- thon DER office shall meet to discuss accept- able locations for these markers. The project shall comply with applic- able State Water Quality Standards, namely: 17-3.051 - Minimum Criteria for All Waters at All Times and All Places. 17-3.061 - Surface Waters: General Criteria 17-3.121 - Criteria - Class III Waters - Recreation, Propagation and Management of Fish and Wildlife: Surface Waters. The Applicant has agreed to comply with all conditions established by the Department. The Marina Site Captain's Cove is a manmade navigable lagoon with access to Florida Bay through a 2,500' long by 100' wide canal located opposite the project site. The waters of Captain's Cove and the canal are designated Class III surface waters, and those of Florida Bay as Outstanding Florida Waters. The controlling depth for access to the proposed marina is found at the mouth of the canal, where Florida Bay is approximately 6' mean low water (MLW). Depths within the canal are typically 1' or 2' deeper than the controlling depth at the mouth. Captain's Cove is roughly rectangular in shape. It measures 1,400' northeast to southwest, and up to 500' northwest to southeast. In the vicinity of the Applicant's property, which is located in the northeast fifth of the cove, the cove measures 350' wide. The bottom depth of the cove is variable. The southwestern four-fifths of the cove was typically dredged to a depth of 25' MLW. Within the northeast fifth of the cove (the basin), a gradation in depths is experienced. The northwest portion of the basin, located outside the project site, is typically 5' - 6' MLW, and heavily vegetated by sea grasses (turtle grass, manatee grass, and Cuban shoalweed). The southeast portion of the basin, which abuts the Applicant's property, consists of a shallow shelf 10' - 20' in width. Beyond this shelf, the bottom drops off steeply to a depth of 20' MLW. The shelf abutting the Applicant's property is sparsely vegetated with mangroves, and provides limited habitat for aquatic fauna such as domingo mussels and paper oysters. Replacement of these mangroves and other shoreline vegetation with riprap would not significantly affect the biological balance within the cove and would provide suitable habitat for existing species. The waters within the cove are quite clear, and meet the Department's water quality standards except for a thin layer at the deepest part of the cove where dissolved oxygen violations were noted. The proposed marina is, however, to be located in the northeast fifth of the cove, opposite the access canal, where the waters are more shallow and water circulation more prevelant. As sited, the proposed marina will not exacerbate or contribute to a violation of the Department's water quality criteria. Areas of Concern During construction of the marina elevated turbidity may be expected by disruption of the basin sediments caused by installation of the facility's pilings. This can be adequately controlled, however, by the use of turbidity curtains during construction. Shading of the benthic environment is a long term impact associated with marinas. Since the boat slips will be located in the deeper 20' MLW depth of the basin, where seagrasses are not present, sunlight will be permitted to reach the productive areas of the basin lying at 5' - 6' MLW and no adverse impact from shading will be experienced. Boats by their very existence and operation present potential negative short term and long term impacts to the environment. Potential damage to the seagrass beds in the northwest portion of the basin will be eliminated or minimized by the planned installation of buoys and/or signs prohibiting navigation in that area. Potential damage from wave action generated by boat operation will be eliminated or minimized by designating and posting the marina and access channel as an "idle speed-no wake" zone.[footnote 1] [footnote 1: Intervenors raised some concern regarding possible impact to the Florida manatee. While manatee have been sighted in the access channel, their occurrence is infrequent. Marking the shallow areas and designating the area as an "idle speed-no wake" zone will provide reasonable assurances that the manatee will not be adversely affected by the proposed marina.] The fueling of boats, hull maintenance, boat cleaning (detergents), and sewage discharge are additional pollution sources associated with marinas. While the proposed marina will have no fueling facilities and no live-aboards will be allowed at the marina, additional conditions must be attached to the permit to eliminate or minimize potential impacts from these potential pollution sources. In addition to the conditions established by the Department, the following conditions are necessary: All craft docked at the marina shall be prohibited from pumping sewage into the waters of the cove. Use of the boat slips shall be limited to those person(s) who own the slip. Leasing of boat slips shall be prohibited. Living aboard any boat docked at the marina is prohibited at all times.[footnote 2] [footnote 2: During hearing some concern was raised regarding the definition of live- aboard. The Department's intent in specifying no live-aboards was that no person(s) stay overnight on any boat moored at the marina. The purpose of this condition is to clarify that intent.] No boat cleaning, hull maintenance, nor fish cleaning shall be allowed at the permitted facility. Limiting use of the boat slips to owners will provide reasonable assurances that the conditions imposed on the requested permit will be complied with. Prohibiting live- aboards, the pumping of sewage, fish cleaning, boat cleaning and hull maintenance, will provide reasonable assurances that Department standards for bacteriological and water quality will not be violated.

# 2
CLEARWATER BAY MARINE WAYS vs CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 93-007070 (1993)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Dec. 13, 1993 Number: 93-007070 Latest Update: Mar. 28, 1994

The Issue The issue in this case is whether the evidence sustains the decision of the City of Clearwater Development Code Adjustment Board (the Board) to deny the application of the Appellant, Clearwater Bay Marine Ways, Inc., for a 62-space parking requirement variance (200 spaces instead of the 262 required under the Code) for its property located at 900 North Osceola Avenue, Clearwater, Florida. (The variance is required as a result of the Appellant's desire to use a part of the property as a cruise ship docking facility.)

Findings Of Fact On or about October 25, 1993, the Appellant, Clearwater Bay Marine Ways, Inc., applied to the City of Clearwater Development Code Adjustment Board (the Board) for an 81-space parking requirement variance (128 spaces instead of the 209 required under the Code) for its property located at 900 North Osceola Avenue, Clearwater, Florida. After filing the application, the site plan was modified, and the variance application was modified to request a 62-space variance (200 spaces instead of the 262 required under the Code). The variance is required as a result of the Appellant's plan to have Adventure Seaways Corporation use a part of the property for use as a docking facility for its 600-passenger cruise ship, the Majestic Empress. The City of Clearwater Development Code (the Code) has no parking space requirements specifically designed for cruise ship operations. To establish the parking space requirements, it was decided to utilize Section 42.34(6)(d)2.c. of the Code, which addresses certain "retail sales and service uses," and states: Theaters, indoor and outdoor recreation centers, swimming pools, skating rinks and other public or private recreation and amusement facilities: One parking space per three customers or patrons computed on the basis of maximum servicing capacity at any one time, as determined by the requirements of the city, plus one additional space for every two persons employed on the premises at peak period of use. Specific provisions over and above the standard may be required for uses such as movie theaters involving successive changes of patrons with a corresponding overlap in parking required. Under that provision, it was calculated that 200 spaces would be needed for peak capacity for the 600-passenger cruise ship. An additional 62 parking spaces are needed for other uses proposed in the site plan (including boat slips, a dive charter operation, a sail charter operation, a 2,800 square foot parts and service business and three work bays), for a total of 262 parking spaces for the overall site plan. The evidence was that no adjustments to the calculation under the "one space per three customers or patrons" formula were "determined by the requirements of the city," and that no additional spaces were required for "persons employed on the premises." (There was some evidence that the Adventure Seaways employees will park off-site.) Nor was there any evidence that there were any "[s]pecific provisions over and above the standard required for . . . successive changes of patrons with a corresponding overlap in parking required." The Adventure Seaways Corporation plans two excursions of the Majestic Empress a day, one during the day and one in the evening. It is expected that the ship would sail at full capacity only approximately one day a week, on Saturday. At peak capacity, it is expected that 30 percent of the passengers will arrive at the docking facility by tour bus. During the day cruise, the buses would leave the facility and return at the end of the cruise to drop off passengers for the evening cruise and pick up off-loading day cruise passengers. They would not remain at the facility during the times other cruise ship passengers would have their cars parked at the facility. Using only the "one space per three customers or patrons" formula under Section 42.34(6)(d)2.c. of the Code, the 70 percent of the total complement of passengers, who are expected to arrive by personal vehicle on peak days, would require only 140 parking spaces (420 passengers divided by three per parking space), well below the 200 spaces allocated to the cruise ship operation under Clearwater Bay Marine Ways site plan. Since Adventure Seaways has not been able to use the Majestic Empress at the Clearwater Bay Marine Ways facility without the parking space variance, it has transferred a smaller cruise ship, the Crown Empress, from its docking facility at Johns Pass on Treasure Island in the interim. The Crown Empress's capacity is only 400 passengers, and no parking space variance is required to use it at the Clearwater Bay Marine Ways facility. Meanwhile, Adventure Seaways has received temporary permission to utilize the Majestic Empress at the Johns Pass facility on the condition that it make greater than normal use of tour buses to transport passengers to and from the Johns Pass docking facility. Adventure Seaways purchased the Majestic Empress after being encouraged by City officials about the prospects of being able to utilize the Clearwater Bay Marine Ways facility. After purchasing the vessel, it had the vessel reconfigured to reduce its draft to accommodate the shallow waters it would have to navigate getting to and from the facility. Adventure Seaways also closed in the top deck of the vessel to meet Code requirements for noise control. Neither the special shallow draft configuration nor the noise control measures are required for utilization of the Johns Pass facility. Part of the encouragement by City officials about the prospects of Adventure Seaways being able to utilize the Clearwater Bay Marine Ways facility included assurances that the City would help Adventure Seaways gain access to additional parking, or develop or acquire additional parking, in the vicinity, if needed. Another option would be to utilize off-site parking and transport passengers to and from the Clearwater Bay Marine Ways facility by bus.

# 3
HOWARD GRINER vs DEPARTMENT OF TRANSPORTATION, 99-003182 (1999)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 28, 1999 Number: 99-003182 Latest Update: Mar. 14, 2000

The Issue The issue is whether Respondent properly issued Site Approval Order No. 3-99-01 for Ochlockonee Bay Seaplane Base pursuant to Chapter 330, Florida Statutes, and Chapter 14-60, Florida Administrative Code.

Findings Of Fact On July 8, 1997, Walt Dickson, the applicant, filed an Airport Site Approval and License Application with Respondent for a seaplane base located two (2) miles south of Panacea, Florida, in Ochlockonee Bay, Wakulla County, Florida, at Latitude N29 degrees, 59'35" N, Longitude W 84 degrees, 23'73" W. The application gives the following legal description of the proposed facility: Lot lying between Williams Brothers Lumber Co. lot and Troy Fain lot on river in SW 1/4 of Section 1. A map of the proposed seaplane base was attached to the application. The map shows a sea lane 1/ toward the middle of Ochlockonee Bay. The sea lane has an east/west heading. It is three (3) miles long with a primary width of one (1) mile and a usable width of one-half (1/2) mile. The application does not indicate the exact position of the sea lane. The application's map indicates that a bridge for U.S. Highway 98 is located east of the proposed sea lane and shoreline facilities. The bridge crosses the bay, connecting the bay's northern and southern shores. The bridge has an approximate height of 42 feet above sea level. East of the bridge, the mouth of the Ochlockonee Bay opens into the Apalachee Bay and the Gulf of Mexico. The application's map indicates that the shoreline facilities of the proposed seaplane base are located on the northern shore of the Ochlockonee Bay, west of the bridge and east of Bayside Marina. A plot of the proposed shoreline facility shows a dock or pier, of undetermined length and width extending into the bay. Ms. Ann Tiller, Respondent's aviation licensing specialist for district three, performed the initial review of the subject application. She considered Chapter 330, Florida Statutes, Chapter 14-60, Florida Administrative Code, and FAA Advisory Circular No. 150/5395 in conducting her review of the application. First, Ms. Tiller reviewed the application to ensure that it was complete. She determined that the application contained, among other things, the following information: FAA air space determination, zoning approval from the appropriate governmental agency, copy of the deed, lease or easement, legal description that indicates section, township, range and geographical coordinates, general location maps showing nearby roads, towns and landmarks, U.S. Geological Survey quadrangle maps . . . [o]r equivalent with facility plotted. Ms. Tiller testified that the application "in itself probably would not show that [the site] is adequate." She stated that "[w]hen [the applicant] sends me the application, he is telling me that he thinks it is adequate." The application did not address the following factors outlined in FAA Advisory Circular No. 150/5395: performance characteristics of the proposed seaplane, water currents or wave action, shifting channels, ship or boating activity on the water, prevailing winds, wind data during daylight hours, adequacy of the water depth for a seaplane, or information about the taxi channel dimensions for the take-out and launch ramp. On May 8, 1998, Ms. Tiller conducted a site inspection to determine the adequacy of the site. She did not go out into the bay on a boat. During the inspection, Ms. Tiller advised the applicant's representative that the required approach ratio for the takeoff and landing area was 20 to 1 and that the applicant would need to install a windsock before receiving a license. She made a general observation of the proposed site, finding no obvious reason to deny site approval. After making the inspection, Ms. Tiller completed an Airport Site Inspection report. The report states that the site "is feasible for the proposed use and can meet the requirements set forth in Airport Licensing and Zoning Rule Chapter 14-60." Ms. Tiller did not consider the factors listed in the FAA Advisory Circular in making this determination. According to Ms. Tiller, the standards in the FAA Advisory Circular apply after the applicant receives site approval. She considers them as guidelines during the licensing phase of the application review, showing "what possibly could be done." By letter dated May 22, 1998, the FAA informed the applicant as follows: . . . it has been determined that the subject seaplane base will not adversely affect the safe and efficient use of airspace by aircraft provided the following requirements are complied with: All operations are conducted in VFR weather conditions. The landing area is limited to private use. You execute and maintain an operational letter of agreement with the Wakulla County Airport that would insure operation at this proposed seaplane base will not disrupt or conflict with operations at the existing public use airport. We recommend you reference FAR [Federal Aviation Regulations] 91.69, Right of Way Rules; Water Operations and comply with FAA Advisory Circular, AC 150/5395-1, Seaplane Bases. On April 19, 1999, the Wakulla County Board of County Commissioners executed an Operational Letter of Agreement between the Ochlockonee Bay Seaplane Base and the Wakulla County Airport. Prior to the hearing, Bobby Grice, Respondent's Public Transportation Manager, made a site inspection. He did not go out into the bay on a boat. Mr. Grice determined that the proposed takeoff and landing area met the required approach ratio of 20 to 1. He also concluded that the proposed sea lane, which is west of the bridge with a heading of 927, did not require a pilot to takeoff and land in close proximity to the bridge. Mr. Grice reached this conclusion without knowing the precise location of the takeoff and landing area. Mr. Grice's observation of the site did not reveal anything that "[p]rohibited [him] from saying that . . . somewhere in the bay that's 3 miles long and a mile wide, that somewhere in there we cannot find an area that is at least 1800 feet long, that's at least deep enough for a plane, and without obstruction." Mr. Grice testified as follows when questioned regarding the possible placement of crab traps in the area that serves as the proposed takeoff and landing area: I would not know if someone had gone in there and put [a crab trap] out, no more than I would know if one was out there with a motorboat running over it. But with the low tide, not the lowest, that's when we would go out and look with the applicant. And at that time if we saw some areas [where crab traps could not be seen] at low tide, then we would certainly assume that . . . at higher tide that [the crab traps] would not be in the way. The greater weight of the evidence indicates that crab traps, twelve (12) to eighteen (18) inches in height, are exposed in the proposed seaplane runway during tides which are low but not the lowest. When the tide is higher, the crab traps are submerged, leaving no indication as to how deep they are in the water. In addition to crab traps, other debris such as picnic tables and pieces of destroyed docks are submerged or floating at unknown locations in the bay. Mr. Grice saw channel markers in the bay. He did not know whether there were any markers in the area of the proposed sea lane. He assumed that the proposed sea lane area was large enough for the applicant to find at least some place where channel markers would not interfere with the required minimum length and approaches. The greater weight of the evidence indicates that channel markers are located directly in the proposed flight path of the seaplane. However, there is no persuasive evidence that these channel markers create a hazard in the approach and departure path of the proposed sea lane. The evidence also shows that the largest concentration of channel markers is located near the seaplane base's taxi and launch areas along the north shore of the bay. The seaplane will have to taxi across the channel and over the mudflats, areas of the bay with soft bottoms, to reach the proposed sea lane. Mr. Grice did not consider the depth of the water in the proposed launch area, taxi area, and sea lane. Therefore, he did not know whether the water depth was adequate for a seaplane. He did not know what type of seaplane(s) would use the seaplane base. According to Mr. Grice, Respondent can place restrictions on the site before licensing to prohibit the use of the seaplane base when the water is at a depth that Respondent determines is unsafe. The depth of the water at mean lower low water levels ranges between one (1) and four (4) feet in the proposed sea lane area. The four (4) foot soundings are located at the eastern tip of the proposed sea lane area, closet to the bridge. The depth of the water at mean lower low water levels ranges between one-half (1/2) foot and three (3) feet along the bay's northern shore in the vicinity of the seaplane base's launch area. Respondent asserts that its primary concern is safety. Therefore, Respondent makes a judgement call about boats and people swimming in the landing area. There is no evidence that Respondent considered the effect of boat traffic before approving the site at issue here. The channel of the bay is within 100 feet of the place where the proposed seaplane will be taken in and out of the water. The greater weight of the evidence indicates that many grouper boats and sport fishing boats use the channel on weekday mornings. On the weekends, boat and jet ski traffic in the channel increases substantially. The weekend boat traffic in the channel is fairly constant. The prevailing wind on the bay is out of the southeast or southwest during most of the day. The prevailing wind runs perpendicular to the proposed sea lane area. A crosswind takeoff and landing is dangerous, especially over a certain speed. The proposed seaplane base is located 80 feet from a dock referred to as the Williams dock. A channel marker is only a few feet from the end of the dock. The greater weight of the evidence indicates that taking a seaplane in and out of the water at the proposed seaplane base launch area is dangerous due to the following conditions: (a) swift channel current of six to ten knots that runs horizontal to the bay's northern shore and perpendicular to the dock; (b) heavy boat traffic in the channel; (c) the concentration of channel markers near the launch area; (d) prevailing winds which run almost perpendicular to the proposed launch area; and (e) the close proximity of the Williams dock. Respondent considers site approval as permission to build the proposed airport. According to Mr. Grice, "[i]t gives the applicant[s] some kind of assurance that they don't go out and spend a lot of money and then DOT comes back and goes through this hearing process after they have spent a lot." Respondent uses the FAA Advisory Circular as a guideline primarily during the licensing phase of application review. Respondent acknowledges that the language in each provision of the circular determines whether a provision is advisory or mandatory. Respondent admits that provisions of the circular containing the words "should" or "shall" relate to mandatory safety issues. Approximately two weeks before the hearing, the FAA requested clarification concerning the coordinates of the seaplane base because its proposed latitude and longitude as provided by the applicant may be incorrect. If the FAA does not issue an approval after receiving clarification, Respondent will deny the application due to the lack of an FAA air space determination.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is

Florida Laws (7) 120.536120.54120.569120.57330.29330.30334.044 Florida Administrative Code (4) 14-60.00314-60.00514-60.00614-60.007
# 5
DEPARTMENT OF COMMUNITY AFFAIRS vs BRUCE A. SCHMITT, MARATHON WOODWORKING, AND MONROE COUNTY, 94-000868DRI (1994)
Division of Administrative Hearings, Florida Filed:Key West, Florida Feb. 18, 1994 Number: 94-000868DRI Latest Update: Jun. 06, 1996

Findings Of Fact Petitioner is the state land planning agency charged with the responsibility to administer the provisions of Chapter 380, Florida Statutes, and the regulations promulgated thereunder. Petitioner has the authority to appeal to the Florida Land and Water Adjudicatory Commission any development order issued in an area of critical state concern. Monroe County is a political subdivision of the State of Florida, and is responsible for issuing development orders for development in Monroe County. Monroe County issued the development order that is the subject of this appeal. Respondent, Bruce Schmitt, is the owner of real property known as Section 15, Township 66, Range 32, Sombrero Beach Road and Tingler Lane - 88 Tingler Lane, Vaca Key Bright, Florida. Most of Monroe County, including the subject property, is within the Florida Keys Area of Critical State Concern, as designated under Sections 380.05 and 380.0552, Florida Statutes. On May 25, 1993, Monroe County issued building permit number 9320003962 to Bruce A. Schmitt, Owner, and Marathon Woodworking, General Contractor, authorizing the construction of a 4 feet X 140 feet wooden dock with a 4 feet x 40 feet terminus. The site of the permitted dock is on an open water shoreline. Running parallel to this shoreline is a channel that is greater than four feet in depth at mean low tide and is greater than twenty feet in width. The permitted dock will terminate at the edge of that channel in an area that is at least four feet deep at mean low tide and more than 20 feet in width. There are no hard coral bottoms found in the area where the dock will terminate. In the vicinity where Mr. Schmitt proposes to construct his dock, there is a channel that is perpendicular to the shoreline that intersects with the channel that is parallel to the shoreline. This perpendicular channel leads out to deep water. The channel providing access to deep water crosses an area of shallow water, which is an area of flats that is referred to by the Department as a shoal. The water depth of this area at mean low tide ranges between 3.0 and 3.5 feet. The channel running parallel to the shoreline and the channel leading out to deep water are not marked. Boats that use this area traditionally have used the channel that is parallel to the shoreline to access the channel in front of Mr. Schmitt's property that leads to deep water. These boats thereafter access deep water by crossing the area of flats that is referred to by the Department as a shoal. While it was established that boats cannot navigate around the shoal, the dimensions of the shoal were not established. Natural shallow water marine communities, such as seagrasses, exist in the waters in the navigation route for boats that will use the permitted dock. Sea grass beds play an important role in water quality maintenance in the Keys through filtration and nutrient uptake and serve as nursery habitats for fisheries. The cumulative impact of the operation of propeller- driven boats in the Keys results in damage and destruction to shallow water marine communities, such as sea grass beds, through prop dredging. There is evidence of considerable prop dredging of the sea grass beds in the shallow waters offshore of the subject property. Boats have been known to run aground in the flats off Mr. Schmitt's property. Any boat using the permitted dock will have to cross shallow waters with seagrass with water depths of less than four feet at mean low tide. Pursuant to the provisions of Sections 380.05 and 380.0552, Florida Statutes, Monroe County has adopted a comprehensive plan which complies with the Principles for Guiding Development found at Section 380.0552(7), Florida Statutes. Section 380.0552(7), Florida Statutes, requires Monroe County land development regulations to comply with certain principles for guiding development, including the following: (b) to protect shoreline and marine resources, including mangroves, coral reef formations, wetlands, fish and wildlife and their habitat. * * * (e) to limit the adverse impacts of development on the quality of water throughout the Florida Keys . . . Monroe County's Comprehensive Plan, which has been approved by the Department and by the Administration Commission, is implemented, in part, through its adopted land development regulations, codified in Chapters 6 and 9.5, Monroe County Code. Section 9.5-345(m) (2), Monroe County Code, provides as follows: (2) All structures on any submerged lands and mangroves shall be designed, located, and con- structed such that: * * * No structure shall be located on submerged land which is vegetated with seagrasses except as is necessary to reach waters at least four (4) feet below mean low levels for docking facilities; No docking facilities shall be developed at any site unless a minimum channel of twenty (20) feet in width where a mean low water depth of at least minus four (4) feet exists. Section 9.5-4(W-1), Monroe County Code, provides as follows: (W-1) "water at least four (4) feet below mean sea level at mean low tide" means locations that will not have a significant adverse impact on off- shore resources of particular importance. For the purposes of this definition, "off-shore resources of particular importance" shall mean hard coral bottoms, habitat of state or federal threatened and endangered species, shallow water areas with natural marine communities with depths at mean low tide of less than four (4) feet, and all designated aquatic preserves under Florida Statutes, Section 258.39 et seq. Section 2.104, Nearshore Waters, Monroe County Comprehensive Plan, Volume II, Future Land Use Element, provides as follows: The Florida Keys are dependent on nearshore water quality for their environmental and economic integrity. The heart of the Florida Keys economy, the means by which Monroe County exists as a civil and social institution, is based on its unique oceanic character. If nearshore water quality is not maintained, then quality of life and the economy of Monroe County will be directly and immediately impacted. OBJECTIVES 1. To protect, maintain, and where appropriate, to improve the quality of nearshore waters in Monroe County. POLICIES 1. To prohibit land use that directly or indirectly degrades nearshore water quality. * * * To prohibit the development of water dependent facilities, including marinas, at locations that would involve significant degradation of the biological character of submerged lands. To limit the locations of water-dependent facilities at locations that will not have a significant adverse impact on off-shore resources of particular importance. For the purposes of this policy, off-shore resources of particular importance shall mean hard coral bottoms, habitat of state or federal threatened or endangered species, shallow water areas with natural marine communities with depths at mean low tide of less than four (4) feet, and all designated aquatic preserves under Florida Statutes, section 258.39 et seq. There are no channel markers to deep water in the area of the permitted dock that have been approved by the Department of Environmental Protection. There was a dispute in the evidence as to whether marking the channel that has served this area as the access route to deep waters would be appropriate and whether such marking would create a navigational hazard. The conflict in the evidence presented is resolved by concluding that the marking of the channel that serves as the navigation access route for boats that will use the permitted dock is appropriate, will aid navigation, and will not create a navigation hazard. This conclusion is reached, in part, because the channel is well defined by its long-term use and connects with the channel that is parallel to the shoreline at a known point.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Land and Water Adjudicatory Commission enter a final order which conditionally denies Building Permit Number 9320003962, but which authorizes Monroe County to issue that permit once the access channel to deep water has been properly marked and approved by the Department of Environmental Protection. DONE AND ENTERED this 25th day of October, 1994, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of October, 1994.

Florida Laws (6) 120.57163.3194258.39380.05380.0552380.07
# 6
MICHAEL L. GUTTMANN vs ADR OF PENSACOLA AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 00-002524 (2000)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida Jun. 16, 2000 Number: 00-002524 Latest Update: Mar. 18, 2002

The Issue The issue is whether ADR of Pensacola should be issued a wetland resource permit and sovereign submerged lands authorization allowing the construction of a 30-slip docking facility on Big Lagoon, Escambia County, Florida.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In this environmental permitting dispute, Petitioner, Michael L. Guttmann, who lives less than one mile from the project site, has challenged the proposed issuance by Respondent, Department of Environmental Protection (Department), of a Wetland Resource Permit (permit) and Sovereign Submerged Lands Authorization (authorization) which would allow Respondent, ADR of Pensacola (applicant), to construct a 30-slip docking facility on Big Lagoon, Escambia County, Florida. The facility will be part of a condominium project to be constructed on the upland portion of the property. As grounds for contesting the permit, Petitioner contended that the Department failed to consider "the long term health of Big Lagoon," navigational hazards created by the project, or public safety; failed to impose an adequate "monitoring program"; did not provide for a "contingency plan for hurricane activity"; failed to consider that the activity will degrade a nearby Outstanding Florida Water [OFW]; and failed to take into account "existing unused marina slips close by." The petition further alleged that the foregoing concerns constituted violations of Section 373.414, Florida Statutes (2000), and Rules 62-4.242, 62-302.300, 62-302.700, and 62- 312.080, Florida Administrative Code. The cited statute identifies "additional criteria" for issuing a permit while the first three rules pertain to OFWs. The last rule contains general standards for the issuance or denial of a permit. Petitioner raised no issues concerning the issuance of the authorization in his initial pleading. Until April 2000, the upland property was owned by the applicant. It was then sold to Harbour Pointe of Pensacola, Inc., which has subsequently entered into an agreement with the applicant allowing the applicant to construct the dock, operate the permit, and purchase a condominium unit. If the application is approved, applicant intends to construct a 442 feet x 4 feet access pier with seventeen 30 feet x 1.5 feet finger piers, thirteen 40 feet x 1.5 feet finger piers, and a 74 feet x 1.5 feet terminal platform, to form a 30-slip docking facility at 10901 Gulf Beach Highway on Big Lagoon, a Class III water in Escambia County, Florida. Approval to use the submerged lands is found in the authorization. The dock will be located in a "fairly pristine area" in Big Lagoon a few miles southwest of Pensacola, Florida. That body of water is six miles in length and is separated from the Gulf of Mexico by a slender coastal barrier island known as Perdido Key, which lies approximately one statute mile south of the project. Continuing west along the shoreline next to the project site are a string of single-family homes with small dock facilities, most of which are less than 1,000 square feet in size and thus exempt from Department permitting requirements. To the east of the undeveloped property are more undeveloped lots and a private yacht club with extensive docking facilities. The facility being challenged here will not be a public marina; rather, it will serve the residents of a proposed upland condominium (consisting of two buildings) to be constructed at the same location. The project is more commonly referred to as the Harbour Pointe Marina. It is fair to infer that Petitioner and adjoining property owners object not only to the dock, but also to the condominium project. The application and project When the application was originally filed with the Department in July 1995, it contained plans for a longer dock and more slips. Due to a reduction in the length of the pier and number of slips to conform to Department rules, other technical changes, and various requests by the Department for additional information, the draft permit was not issued by the Department until May 2000. The Department considers this a "major project" with "major [hydrographic and water quality] issues connected with it." In reviewing the application, the Department considered whether reasonable assurance had been given by the applicant that water quality standards would not be violated, and whether the additional criteria in Section 373.414(1)(a)1.-7., Florida Statutes (2000), had been satisfied. The Department concluded that water quality standards would not be degraded, and that the project, as designed and permitted, was not contrary to the public interest. In making the public interest determination, the Department typically assigns a plus, minus, or neutral score to each of the seven statutory factors. In this case, a neutral score was given to historical and archaeological resources [paragraph 373.414(1)(a)6.] since there were none, while the permanent nature of the project [paragraph 373.414(1)(a)5.] caused it to be rated "a little bit on the minus side"; all other factors were given a plus. Department witness Athnos then concluded that on balance the project "was a plus because it will not adversely affect any of these things." The access pier (dock) runs perpendicular from the shoreline and stretches out some 442 feet to where the water reaches a depth of seventeen feet, which is the deepest point in Big Lagoon. The unusual length of the dock is required so that the boat slips will begin past the seagrass colony (which lies closer to the shore), to prevent boat propeller blades from cutting the top of the seagrass, and to reduce the amount of sedimentation stirred up by the boat propellers. Aerial photographs confirm that when completed, the dock will probably be the largest in Big Lagoon, and much larger than the neighboring docks to the west. The use of boat slips will be limited to condominium owners. Only 19 slips will be constructed initially, since the applicant has secured approval at this time for only the first phase of the condominium project. When approval for the second phase is secured, the applicant intends to add an additional 11 slips. Water quality In his initial pleading, Petitioner made a general allegation that the Department failed to consider "the long term health of Big Lagoon"; there were no specific allegations regarding water quality standards. In his Proposed Recommended Order, however, he argues that the [a]pplicant failed to provide reasonable assurances that water quality standards would not be violated." Assuming arguendo that the issue has been properly raised, Petitioner has still failed to substantiate his allegation. That portion of Big Lagoon where the project will be located is a Class III water of the State. Studies on metals, greases, oils, and the like submitted by the applicant reflected that the "water quality [in that area] did not exceed the standards in Rule 62-302." To provide further reasonable assurance regarding water quality standards, the applicant has voluntarily agreed to use concrete piling and aluminum docks. Unlike wooden piling and docks, these types of materials do not leach toxic substances such as arsenic, copper, and acromiom into the water. In addition, special permit conditions require that sewage pumpout equipment be located at the site so that boats will not discharge raw sewage into the waters. Liveaboards are prohibited, and fueling will not be available at the facility. Finally, the cleaning of fish is not allowed, and boat owners cannot scrape their boat bottoms while docked at the facility. All of these conditions are designed to ensure that water quality standards will not be violated. Enforcement mechanisms for the above conditions are found in either the permit itself or Chapter 403, Florida Statutes. Also, one of the conditions in the draft permit expressly states that the applicant is not relieved of liability for harm or injury to humans, plants, or property caused by the construction of the dock. However, if a permit is issued, Condition 9 of the permit should be modified to require that trained personnel be available twenty-four hours per day, rather than just during standard business hours, to assist boaters with, and ensure that they use, the sewage pumpout equipment. Any permit issued should also require that boats be placed on lifts while using the docking facilities. This will prevent any leaching of paint from the boat bottoms into the waters. Otherwise, the paint would cause a degradation of the water. The more persuasive evidence supports a finding that, with the additional conditions, reasonable assurance has been given that the state water quality standards applicable to Class III waters will not be violated. Outstanding Florida Waters In his complaint, Petitioner has contended that "the proposed activity will degrade an [OFW] as a result of its close proximity to the Gulf Islands National Seashore," and that the"[D]epartment has made no analysis of this project['s] impact on the [OFW] which is adjacent to the proposed activity." The record discloses that the southern portion of Big Lagoon has been designated as an OFW. This area includes the waters around Gulf Islands National Seashore and Big Lagoon State Park; they begin approximately 650 to 700 feet south of the end of the dock. As noted earlier, the project is located within Class III waters. Because the Department found that no violation of state water quality standards in those waters would occur, it likewise concluded, properly in this case, that the project would have no impact on any OFW, even though such waters begin some 650 or 700 feet away. Under these circumstances, there would be no reason to assess the water quality in the OFWs or the projected impacts on those waters, as Petitioner suggests. In the absence of any credible evidence to the contrary, it is found that the project will not adversely impact an OFW. Hydrographic characteristics If a dock has more than ten boat slips, the Department routinely conducts a hydrographic (flushing) study to determine whether the structure will adversely affect the flow of the water in the area or cause erosion or shoaling on adjacent properties. In the summer of 1999, a Department engineer conducted a hydrographic study using a dye tracer and concluded that flushing characteristics were excellent and that there would be no adverse effects caused by the project. This conclusion has not been credibly contradicted. Therefore, it is found that the dock will not adversely affect the flow of water or cause harmful erosion or shoaling. Navigational issues In his initial pleading, Petitioner raised a contention that the project will create "navigational hazards" because the dock "extends nearly into a navigation channel which routinely carries commercial towboats transporting hazardous material, the spill of which would adversely affect Big Lagoon." He also alleges that the rupture of a vessel could impact public safety. Channel markers placed by the U.S. Army Corps of Engineers in the Intracoastal Waterway (of which Big Lagoon is a part) define a navigational channel for boats approximately 400- 500 feet south of the end of the proposed dock. That channel is used by both recreational and commercial traffic, including barges and other large watercraft which regularly haul oil, chemicals, and other products through the Intracoastal Waterway to and from Pensacola, Panama City, and St. Marks, Florida. The water in the marked channel is only thirteen feet deep. Because the U.S. Army Corps of Engineers has jurisdiction over the maintenance of the marked channel, the Department defers to that entity's judgment in determining whether a proposed structure will impede navigation in the marked channel. The proposed dock ends near the deepest part of the natural channel where the water reaches a depth of seventeen feet. Because of the deeper water to the north, which allows the boat captain to "get better steerage," the commercial boat traffic sometimes tends to follow the natural channel, rather than the marked channel formed by the navigational aids. When they do so, however, they are straying from the so-called "legal" channel. Petitioner's expert, a retired tugboat captain, opined that in a storm or squall, a commercial boat using the natural rather than the marked navigational channel might be blown extremely close to the dock or even strike it, thus causing a hazardous situation. He acknowledged, however, that he was not predicting more accidents because of the construction of the dock; he also admitted that the dock would not cause ships to "sudden[ly] have problems navigating that Big Lagoon." The location of the proposed dock was shown to the U.S. Army Corps of Engineers and the Florida Marine Patrol, and there were no adverse comments regarding this issue by either agency. In the absence of any negative comments by those agencies, and the acknowledgement by Petitioner's own witness that the dock will not cause accidents or create navigational problems for other boaters, the more persuasive evidence supports a finding that the project will not adversely affect navigation or public safety in Big Lagoon. Seagrass and monitoring Petitioner has alleged that Big Lagoon "is the healthiest body of water in Escambia County with a white sand bottom and abundant seagrass," and that the proposed project will adversely affect its "long term health." He also alleges that the Department has failed to provide a "remedy or punishment should the results [of the Department's monitoring plan] indicate that the seagrass has been harmed"; that the Department's monitoring plan is not "of sufficient duration to reasonably report the long-term effect of concentrated mooring and traffic" or "sufficiently specific to insure usable data"; and that the data relied upon by the Department [such as photographs] were not "sufficient" to determine the existing health of the seagrass. The evidence reflects that a "nice, healthy seagrass community" is found in the area where the dock will be constructed. It stretches out several hundred feet from the shoreline to where the water reaches a depth of around six feet. The Department considers seagrass to be a "most important resource" which should be protected. This is because seagrass is essential for "binding" the shoreline and stabilizing the sediments, and it serves as a nursery area for juvenile fish and shellfish. Indeed, due to these beneficial effects, far more species of shellfish are found in areas where seagrass thrives than in areas where no seagrass exists. To protect the seagrass, the dock has been extended out 442 feet from the shoreline so that the first boat slip begins at a depth of seven feet, or just past where the seagrass ends. This will prevent the scarring of the grass by boat propellers and reduce turbidity that is typically caused by propeller dredging and boat wakes. Thus, at least theoretically, no boat activity by condominium owners is contemplated in waters of less than seven feet. Because seagrass requires as much light as possible to survive, educational signs will be posted in the area to warn boaters that seagrass is found closer to the shoreline, and that mooring in that area is prohibited. There is, however, no enforcement mechanism to ensure that condominium owners or nonresidents comply with these warnings. Under the draft permit, the Department is allowed to access the premises at reasonable times for sampling or monitoring purposes. A special section of the draft permit includes a number of requirements pertaining to the monitoring of turbidity levels during dock construction while another section requires the applicant to take photographs of the existing seagrass beds at numerous locations before, during, and after construction of the dock. Condition 14 requires that the permittee maintain "records of monitoring information" for at least three years. The evidence supports a finding that if a permit is issued, a mapping of the seagrass should be made prior to construction of the dock and during the height of the growing season (September and October). When the photographing of the area is performed, the applicant should use a sampling protocol that is based on a scientifically determined method. Also, both affected and unaffected areas should be monitored to compare the effect of the additional boat traffic on the seagrass after the dock is constructed. All of these conditions should be incorporated into any issued permit. According to Dr. Heck, a marine biologist who specializes in the study of seagrass and testified as an expert on behalf of Petitioner, seagrass beds in Big Lagoon have been "shallowing up" or thinning out in recent years due to decreasing water clarity. In other words, as the water becomes cloudier from more and more boat activity, the sunlight cannot penetrate and the seagrass will not thrive. The seagrasses most susceptible to disappearing are those that are found at the deepest depth. Doctor Heck attributed the decline in seagrass to increased human activity in the area. This activity is related not only to the existing homeowners in the area, but also to the non-resident boaters (both recreational and commercial) who use the waters in that area. A Department study conducted in 1995 confirmed that the only seagrass area in North Florida "significantly affected" by propeller scarring was an area in Big Lagoon known as Scallop Cove, near Spanish Point. This study is consistent with those studies performed by Dr. Heck in the late 1990's, and one as recently as last year, that support a finding that seagrass in Big Lagoon is on the decline due to both propeller scarring and increased turbidity caused by wakes from larger recreational boats. For this reason, Dr. Heck concluded that the addition of thirty boats at the project site, some of which would be as large as 30 feet or so, would have a "negative effect" on the seagrass colony. This in turn will cause a negative effect on the marine productivity in the area, as well as the conservation of fish and their habitat. Doctor Heck's testimony on this issue is found to be the most persuasive. Other concerns Petitioner further contends that the Department failed to provide a "meaningful contingency plan for hurricane activity." This matter, however, is beyond the permitting jurisdiction of the Department. Petitioner has also contended that the Department failed to take into account "existing unused marina slips close by" which could be used by the condominium owners. Like the prior issue, this matter is not a consideration in the permitting scheme. Another issue raised by Petitioner, albeit untimely, was that the construction of this dock could lead to further development in Big Lagoon. There was, however, no evidentiary support for this contention. Indeed, there is no evidence that future permit applications with impacts similar to this application can reasonably be expected in the area. At hearing, Petitioner raised for the first time a contention that the applicant no longer owns the upland property and thus a permit/authorization cannot be issued to that entity. Aside from this issue being untimely, the fact that a permit holder does not own the upland property is not unusual. If this occurs, permits and authorizations (leases) are routinely transferred to the new owner once the Department receives the necessary title information. It is not a ground to defeat the application. Petitioner also raised for the first time at hearing a contention that the site plan approval for the condominium has expired under a provision of the Escambia County Land Development Code and therefore the permit should be denied. Again, the issue is untimely; more importantly, it should be addressed in another forum since the Department has no jurisdiction over this issue. Likewise, a legitimate concern by an adjoining property owner, witness Hobgood, and an area realtor, that Hobgood's single-family property would probably decline in value if the project is built is nonetheless beyond the Department's jurisdiction. Finally, a contention that the Department improperly calculated the maximum number of boat slips for an 88-unit condominium project has been rejected. The record contains a lengthy explanation by witness Athnos which shows that the Department's calculation under Rule 18-21.004(4)1., Florida Administrative Code, was correct. Those calculations are also detailed in Respondents' Exhibit 14.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Environmental Protection enter a final order denying the application of ADR of Pensacola for a wetland resource permit and sovereign submerged lands authorization. DONE AND ENTERED this 28th day of February, 2001, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (850) 488-9675, SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of February, 2001. COPIES FURNISHED: Kathy C. Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Michael L. Guttmann, Esquire 314 South Baylen Street, Suite 201 Pensacola, Florida 32501-5949 Charles T. Collette, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 David A. Sapp, Esquire 1017 North 12th Avenue Pensacola, Florida 32501-3306 Teri L. Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000

Florida Laws (5) 120.569120.57253.77267.061373.414 Florida Administrative Code (6) 18-21.00428-106.20562-302.70062-312.06562-312.08062-4.242
# 7
ANNELLE AND JUDSON WEST vs JACK RATKOVIC AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 89-006363 (1989)
Division of Administrative Hearings, Florida Filed:St. Augustine, Florida Nov. 22, 1989 Number: 89-006363 Latest Update: Jun. 19, 1990

Findings Of Fact Petitioners Kayla and Eric Douglas in DOAH Case No. 89-6367 failed to appear or send a qualified representative on their behalf to formal hearing, and, accordingly, their petition is subject to dismissal, pursuant to Rule 221- 6.022 F.A.C. Applicant Ratkovic owns two adjacent rectangular-shaped pieces of property, Lots #5 and #6, located at 19 Magnolia Drive, within the city limits of St. Augustine, Florida. These lots are bounded on the north by Oceanway Street, a dirt road, and on the east by Magnolia Drive. The Ratkovic house is located on the lot which directly abuts Magnolia Drive (Lot #6). Lot #5 is immediately to the east of Lot.#6 and is separated from it by a ten-foot wide alleyway. Oceanway Street deadends into Salt Run, a Class III Water of the State, which is next to Lot #5. Lot #5 is 55 feet wide in a north-south direction and 82.5 feet long in an east-west direction. Lot #5 is completely within the landward extent of Salt Run. Lot #5 may be cnaracterized as a flat, intertidal sand beach and DER's jurisdiction with respect to it extends to the ordinary mean high water line. Salt Run is an embayment off of the Atlantic Ocean which, with the help of a concrete artificial groin, forms a cove in the vicinity of the proposed project. Water flow in the cove is serene enough to allow a tidal marsh to grow along parts of the shoreline of the cove, but there are still two areas of the cove in which no vegetation grows: waterward of Applicant's property and waterward of the property of Petitioners Steger (DOAH Case No. 89-6366). The Steger property is several lots south of the Applicant's property. Marine vegetation grows in the southeast quadrant of Lot #5 and to the north of Lot #5. The proposed project involves the placement of 19 pilings on 4'8" centers along the northern lot line of Lot #5. The proposed pilings would run on a line in the middle of the unvegetated area, approximately halfway between the two areas of tidal marsh growth, out to the waterward edge of Lot #5. 7. The Applicant desires a dock for Lot #5 and has already availed himself of the general permit provisions of Rule 17-312.808 F.A.C. The dock has not been constructed because he has been unable to obtain local approval for its construction. Respondents assert as a legal proposition that a 1,000 square foot (6 foot wide) piling-supported dock, if built on Lot #5, would be exempt from the requirement of obtaining a DER dredge and fill permit such as the one at issue here, and because of Respondents' assertion, it is one of Petitioners' concerns in this proceeding that the Applicant not be permitted to do by indirection that which he has been prohibited by local government (but not DER) from doing directly. However, that dock permit and those peripheral legal propositions need not be resolved in this proceeding for the reasons set out infra. The Applicant intends that the proposed pilings at issue here will serve as the northern support structure of his proposed dock, if local approval is eventually granted for the dock. However, without such local approval of his proposed dock, the Applicant's proposed pilings would still serve as a barrier to vehicular traffic which presently has unrestricted access across the beach and across his private property, Lot #5. The Applicant represented that he wants to install the pilings with or without the dock approval so as to prevent late night driving of cars on his beachfront property. Salt Run is full of docks, and this vicinity of Salt Run is the only area totally unobstructed by docks. This vicinity also has the only bottom area in Salt Run not encrusted with oyster or other bivalve shells. The only water quality standard to be impacted by the proposed project is turbidity. Turbidity results from the resuspension of bottom material and will occur briefly during the placement of the pilings. At the proposed project site, the bottom material is sand, which when resuspended, rapidly falls to the bottom and therefore has little environmental impact under the circumstances of this application. However, turbidity controls have been required by Specific Condition 4 of the DER Draft Permit. The foregoing factors assure that water quality standards will not be violated by the proposed pilings. The testimony of DER's agency representative, Jeremy Tyler, who was accepted as an expert in oceanography and the impacts of dredge and fill projects to wetlands and water quality, is accepted that because the proposed pilings will be located on a flat, intertidal sand beach, and because installation of the pilings requires appropriate turbidity controls, the placement of the proposed pilings will not generate turbidity sufficient to impact the tidal marsh, and, accordingly, their placement will not adversely affect the conservation of fish, wildlife, or their habitats. Similarly, it is found that fishing, marine productivity,- and the current conditions and relative value of functions being performed by the tidal marsh will not be adversely affected by the proposed project. The proposed project will not have any effects upon the public health, safety, or welfare, the property of others, or significant historical or archaeological resources. It will be permanent. The proposed project will not adversely affect the flow of water at the proposed site and will not cause harmful erosion or shoaling. Depending upon the time of the month, the time of the year, and the height of the tide, water could wash up to the landward side of Lot #5, or could leave the lot high and dry. Oceanway Street, the dirt road adjacent to the Applicant's property on the north, has historically been used by the neighbors and general public to drive down to Salt Run. These persons have used the cleared area between the tidal marsh sections described supra for wading, swimming, throwing of cast nets, and launching of boats and windsurfing boards. Because it is within the city limits, the area is also very attractive to those who just wish to stroll up the beach on a north-south tangent. In gaining access to the water of Salt Run, some persons have not differentiated between Lot #5, which is private property, and Oceanway Street. One reason for this lack of discernment seems to be that nearby Ingram Street, also a public access, is in such disrepair that prudent persons avoid it. Also, Applicant either built on Lot #6 or moved into the house on that lot only within the last few years, and while Lot #6 was formerly unoccupied, the neighbors and the public were free to walk dogs, moor and launch boats, and enjoy virtually all recreational activities in public areas and on Lot #5 with impunity. In essence, Lot #5 has been treated as a public beach. In the recent past, the Applicant's attempts to "run off" persons who have utilized his property in these ways have caused bad feelings in the neighborhood. Also, Lot #5 has been inadvertently used for recreation some of the time that it is covered with water, and this seems to be the source of some persons' confusion over where the Applicant's right to "run off" the public begins and ends; however, the evidence is insufficient to establish a public easement across Lot #5. If the proposed piling project were constructed, beach walkers, swimmers, or waders approaching one of the piles (and if local approval is obtained, ultimately the dock) might have to alter their course to avoid a collision. The 4'8" gap between pilings would allow this, but in the event a dock is installed, it might be more prudent to avoid the area altogether. Cast netters would have to alter their net throws so that their backswing or release would not intersect the position of a proposed piling and so that their nets would land along the line of the proposed pilings instead of on the pilings or dock. This could be done. Boaters and windsurfers, after placement of the proposed pilings, would have a far narrower area within which to launch and land their boats and boards. However, this narrowing would not preclude such launching or landing. Boats often start and end their journeys at docks, which, from a boat hull's perspective, are nothing more than a row of pilings. Windsurfing boards are approximately two feet at their widest. When a windsurfer capsizes in open water, he typically rights his board and starts anew. Here, if windsurfers do not wish to launch in the clear area remaining to the north of the last piling, which they could easily do, they would be able to walk their boards out to the last piling and start as they would in open water. The proposed pilings will make it more difficult to launch or land a windsurfing board, but it would not preclude such use of the water. There is also a public boat ramp at Lighthouse Park, the northern boundary of which is four blocks to the south and three blocks to the west of the proposed project site. Boaters or windsurfers who did not choose to use the end of Oceanway Street to obtain access to Salt Run would be able to use that location.

Recommendation Upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Regulation enter a Final Order Dismissing the Petition in DOAH Case No. 89-6367; Denying the Petitions in DOAH Case Nos. 89-6363, 89-6364, 89-6365, 89-6366, and 89-6368; and Granting the dredge and fill permit application as specifically conditioned by the Department of Environmental Regulation's Intent to Grant. DONE and ENTERED this 19th day of June, 1990, at Tallahassee, Florida. ELLA JANE P. DAVIS, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of June, 1990. APPENDIX TO RECOMMENDED ORDER CASE NOS. 89-6363, 89-6364, 89-6365 89-6366, 89-6367, 89-6368 The following constitute specific rulings pursuant to Section 120.59(2) F.S. upon the parties' respective proposed findings of fact (PFOF): Petitioners Stegers' PFOF filed May 22, 1990: Paragraph 1: Sentences 1, 3, and 4: Accepted as fact, however, the degree of obstruction, the significance of recreational values within the applicable statutory balancing test, and the legal implications of that balance as contained in the Recommended Order more accurately reflect the record as a whole. Sentence 2: Accepted as modified to more accurately reflect the record as a whole. Sentence 5: Rejected as unproved. See what was proved and what was speculated in FOF 9 and 11 and COL 11. Paragraph 2: Rejected as not proved. Respondent DER's PFOF filed May 22, 1990: 1-16 Accepted as modified to more accurately reflect the credible, competent, substantial evidence of record as a whole. To date, no other PFOF have been filed. COPIES FURNISHED: Judson and Annelle West 4 Lighthouse Avenue Anastasia Island St. Augustine, Florida 32084 Virginia Quill Myers Mary Susanna Myers 322 Ponce de Leon Avenue Anastasia Island St. Augustine, Florida 32084 Ronald Asner 37 Magnolia Drive Anastasia Island St. Augustine, Florida 32084 Dan and Sue Steger 25 Magnolia Drive Anastasia Island St. Augustine, Florida 32084 Kayla K. and Eric Douglas 69 Lighthouse Avenue Anastasia Island St. Augustine, Florida Mary H. Acebal 32084 E. V. Acebal 10 Lighthouse Avenue Anastasia Island St. Augustine, Florida 32084 Mr. Jack Ratkovic Post Office Box 4482 St. Augustine, Florida 32085 William H. Congdon Assistant General Counsel, DER Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Dale H. Twachtmann, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57267.061
# 8
PINE ISLAND PROPERTIES, INC. vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 93-002713 (1993)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida May 18, 1993 Number: 93-002713 Latest Update: May 10, 1994

Findings Of Fact Pine Island Properties, Ltd., (Petitioner) owns a residential development project identified as "Pelican Inlet" located on Pine Island, Lee County, Florida. The Petitioner seeks a permit to fill 0.78 acres of wetlands to construct the project. The Department of Environmental Protection (Department) is responsible for reviewing permit applications under Chapter 403, Florida Statutes and related administrative rules. The Department file number for this application is 362004755. The Pelican Inlet project is located in Lee County, Florida, Sections 4 and 9, Township 45 South, Range 25 East. The project impact site is immediately adjacent to "Forty Acre Bay/Bay 36" (bay) which is a Class II Outstanding Florida Water and part of the Pine Island Sound Aquatic Preserve. There are no other developments on the bay. Access from Pelican Inlet to Pine Island Sound is via the bay. Pine Island Sound is a popularly used water body, with substantial fishing and recreational use. The Pelican Inlet development fronts a man-made canal which runs generally east-west. The canal is between two to ten feet deep. The Petitioner did not construct the canal. It appears that during the dredging of the canal, spoil was deposited along the canal banks, resulting in an upland area in the midst of the wetlands. The spoil is vegetated by Australian pine. The elevation of the property drops approximately 1.5 feet where the higher spoil abuts the wetlands. The Petitioner owns only the north half of the canal. Other parties not involved in this application own the south half of the canal. According to the Petitioner, the south half owners are not interested in assisting in the Petitioner's project. Extensive mangrove growth exists immediately north and south of the project impact area. Immediately along the banks of the canal are red, black, and white mangroves. At the east end of the canal is a dense growth of mature black mangroves. Further to the east lie undeveloped uplands vegetated with slash pine and saw palmetto. Although there has been some trash dumping in the area, the mangroves to be impacted by the proposed development are part of a high quality, functioning, healthy, and productive wetlands system. The area currently provides broad water quality benefits and wildlife habitat. The north part of the impacted wetlands area contained a dirt road. Exotic vegetation, including Brazilian pepper Australian pine and Melaleuca, has invaded the trail area. Away from the road, the wetlands are dominated by buttonwood, seashore dropseed, beach carpet, salt grass, needlerush, and leather fern. The Western end of the canal connects to the bay. Water depths in the bay average approximately 1.5 feet deep, but vary significantly. The bay bottom is composed of fine organic mud. There is evidence of damage caused by boat propellers in some parts of the bay. The bay is used by species of fish, snails, mollusks, crabs and birds and is regarded as a productive marine habitat. Within the development, the Petitioner seeks to locate a total of 23 single family homes. Fourteen of the 23 homes will be located directly along the canal. Of these 14, eight will require placement of fill in the adjacent mangroves; two others are entirely within the mature mangrove wetlands. The remaining nine houses would be placed in the area east of the canal. Within the wetlands and uplands portion of the property, the development will include the 23 houses, driveways, access roads, sewer treatment plant, spreader swale and retention area. Subsequent to the filing of the application, the parties engaged in an extensive dialogue in an attempt to reach a resolution of the matter. The issues raised by the Department essentially centered on two general issues, minimization and mitigation of the wetlands lost through fill and resolution of the anticipated secondary impacts of the project. The parties appear to have resolved concerns related to the mitigation of the wetlands lost and impacted by the fill. At the hearing, there was minimal evidence and testimony related to the wetlands mitigation issues. Based on the apparent lack of conflict related to the wetlands loss mitigation, this Recommended Order is directed towards the cumulative and secondary impacts of the project. On August 21, 1991, the Petitioner filed an application for permit/water quality certification with the agency. On October 28, 1991, the Department conducted a field appraisal of the project. Based on the appraisal, the Department determined that the project was unpermittable as proposed in the application. On December 24, 1991, the Department forwarded to the Petitioner a copy of the site inspection report. In the report, the Department identifies a number of concerns related to the expected environmental impact of the project. Thereafter, the parties began an extensive dialogue regarding the project. On March 12, 1992, the Department issued a Notice of Permit Denial. The parties continued to discuss mitigation, and several extensions to the deadline for filing an administrative hearing request were granted by the Department. There is no dispute regarding timeliness of the request for hearing. The Notice of Permit Denial indicates that the Department's concerns center on the potential for turbidity-related water quality violations which could result from unstabilized fill, the adverse floristic impact caused by fill washout into adjacent wetlands, the loss of the filtering benefits provided via the filled wetlands and the adverse impact on wildlife habitat. The Notice of Permit Denial further identifies concerns related to the cumulative and secondary impacts of the project. Such impacts include boat docks in the canal resulting in an increase in the intensity of boating activity in the Bay. The Notice also addresses the precedential impact of permitting this project as it relates to other properties similarly situated, specifically, the property on the south side of the Canal. The expected increases in boat traffic will result in turbidity and damage to the bay bottom through prop dredging, in turn causing injury to the marine habitat's sea grasses and benthic organisms. During the ongoing dialogue with the Department, the Petitioner submitted a mitigation plan. In the Department's letter of June 26, 1992, related to its review of the plan, the Department notes that the proposal failed to address the anticipated impact of boat users on the shallow bay adjacent to the canal. Paragraph #23 of the letter states as follows: Please be advised that the submitted proposal does not adequately address the secondary impacts of the proposed development. There is still a high potential for boat use within the adjacent shallow bay which will significantly degrade this portion of the aquatic preserve, additional boating pressure could also result in requests for dredging a channel within this bay....Before a permit can be issued all of these impacts need to be addressed. One possible way to address these would be to provide easements over adjacent wetlands and the canal that specifically prohibit dock construction...and/or to fill in a portion of the canal to prevent large boats from utilizing the area. In a letter of July 29, 1992 in response to the Department's earlier transmittal, the Petitioner stated: Boat access to coastal waters of Lee is a very important aspect of this project, however only two of the twenty-four lots have direct private property access to the canal and these are lots 1 and 18. Only lot 1 has both canal and natural water frontage. The potential for secondary wetland impacts related to permitting of this project are real and are also a concern of the applicant. As to the issue of boat docks, the Petitioner stated: Pine Island Properties, Limited, the owner of the project, is not proposing to permit or construct any boat docks within the project boundary. Each lot owner must, if they wish to, make application through appropriate state and federal agencies for a boat dock. As to the matter of the shallow adjacent bay, the Petitioner stated: The existing water depths in the adjacent bay system already by itself mandates and places limits on access by large boats, ones with a deeper draft. Local knowledge of both bottom topography as well as tidal conditions and times is necessary for one to travel through these back bay areas. The applicant agrees to place reasonable size, i.e., draft, restrictions on boats allowed into and out of the project. The draft limit restriction for boats would be 24 inches. In additional all boats with engines larger than 35 horsepower would be required to have hydraulic motor/outdrive lifts capable of allowing adjustments in the depth of the operation of the propeller. The applicant also accepts responsibility of placing appropriate depth markers from the western end (exist) (sic) of the unnamed canal to the "between island" passage approximately 750 feet directly to the west. Placement of markers would identify the preferred travel route and inform boaters, through placement of signs, that they are in an aquatic preserve and caution them about damage to bottom of the bay if propellers are set to (sic) deep. By Department letter of September 21, 1992, the Department noted continuing concerns with the impacts of the project. In relevant part, the letter states, "[T]he Department still lacks reasonable assurance that the project's impacts will be offset. Also, you have not yet demonstrated to the Department's satisfaction that the project will be clearly in the public interest." The Department's September 21 letter addresses remaining questions about the wetlands fill area, as well as canal use restrictions. Specifically as to the canal issue, the letter states: Your proposal to place a draft restriction of 24" on boats using the canal to protect adjacent waters which are 18" deep is not acceptable. A deed restriction prohibiting property owners from using or mooring motorized vessels in the canal would be more acceptable....A conservation easement could also prohibit the construction of docks and/or the mooring of motorized vessels on the shoreline by the present owners or by potential future owners such as a homeowners association. Based on the Department's assertion that the shallow bay could not accommodate boat traffic related to the development, the Petitioner conducted a survey of existing water depths in the vicinity of the canal. In its October 28, 1992 letter in response to the Department, the Petitioner responded as follows: In general there is sufficient water for shallow draft motor driven vessels, however local knowledge, proper tidal conditions and informed operators would be essential to a safe and non-habitat damaging passage from the canal mouth to the deeper waters of Pine Island Sound. Evidence of prop scars...provides a longlasting record of past damage to the turtle grass beds by (sic) without proper boat handling skills and knowledge. Sizing of boat draft and the requirement that all boats possess hydraulically adjustable outboards units or if inboard drive units then the outdrives must be adjustable is a must. During lower tidal phases, e.g., mean low water, water levels can be expected to drop another foot which would result in water depth ranges of about 17 to 30 inches, definitly (sic) a problem for boats with a hull draft of 18 inches regardless of what angle the drive unit is positioned. Placement of informational signs as well as placement of channel marks would reduce hull and drive unit impacts to the adjacent bay bottom. In concluding the October 28 letter, the Petitioner makes the following recommendations: Recommendations for consideration: Boats limited to hull drafts of 20 inches. All boats required to have adjustable power units. Channel markers required from the Pelican Inlet canal mouth through to a point midway between the islands and Cork Island. This is approximately 2,800 feet west of the canal mouth. These markers would be spaced, approximately 150 feet apart, on-center,. (sic) Thus under southflorida's (sic) winter foggy conditions or after dark ease of marker detection/direction would be a useful aid to navigation. Informational signs should be installed at "entry points" such as the canal mouth, the between-island pass and between the island headlands. These should inform the boater of the environmental sensitivity, the shallow water conditions, the existence of grass beds and requirement of a slow speed, "no wake" zones. Monitoring of bentic (sic) habitats over the first five years would also determine if the above conditions are effective at protecting the coastal habitats. By Department letter of December 17, 1992, the Department again addressed continuing concern with the impact of the project. Paragraph 14 of the letter states: Thank you for the water depth report. As the report states,"...local knowledge, proper tidal conditions and informed operators would be essential to a safe and non-habitat damaging passage from the canal mouth to the deeper waters of Pine Island Sound." Since it would be extremely difficult to provide the Department with reasonable assurance that all three of these conditions will be present during motorized vehicle operations originating on-site, other assurance that impacts will not occur and degrade the Outstanding Florida waterbody must be provided. As previously stated, legally binding agreements regarding draft and other restrictions may be difficult to enforce. Monitoring of an activity's impacts is only useful if there is some recourse to eliminate or reduce any impacts revealed by monitoring. The submitted report reinforces the Department's position that reasonable assurance, beyond that already proposed, must be provided that boat traffic originating from the project's canal will not adversely impact the adjacent shallow waters. Such assurance could include, but would not be limited to, a mnechanical or physical draft restrictor in the canal, an agreement not to seek permits to expand the existing canal, and authorization from the Department of Natural Resources for the proposed channel markers and informational signs. Please note that additional assurance beyond these may also be required. Paragraph 15 of the Department's December 17, letter states: Although not proposed as part of this application, construction of boat docks in the canal is a secondary impact which could be reasonably expected to occur as a result of issuing a permit for the proposed activities. Please provide reasonable assurance that construction of docks in the canal and subsequent mooring of boats will not contribute to a degradation of water quality below State water quality standards in the canal and in the adjacent waters. By letter of February 1, 1993, the Petitioner responded to paragraph 14 of the Department's December 17 letter as follows: The applicant does agree not to seek permits to expand the existing channel and will seek authorization from the Department of Natural Resources for the proposed channel markers and informational signs. In a twenty page letter, dated July 29, 1992, also answering questions of the FDER, Kathleen Parker Greenwood, the applicant stated that he was in agreement as to the placement of restrictions on the draft of boats allowed into and out of the project. This draft limit was set at 24 inches. In addition boats having engines larger that 35 horsepower, would have to have a hydraulic motor/outdrive lift, this to allow adjustments in the depth of propeller operation when operating in or during low water conditions. The applicant may accept the proposal of placement of a draft restrictor at the mouth of the unnamed canal, however would like additional information regarding available designs. Are there any floating types, ones that could be moored permanently at the mouth of the project canal, and rise and fall with the tide, similar in concept to the method used to moor floating docks, i.e., a collar/ring freely moving up and down on a stationary piling? This would allow the setting of a uniform depth regardless of tidal or wind induced depth of water conditions. The Petitioner responded to paragraph 15 of the Department's December 17 letter as follows: The applicant also does not want to degrade existing water quality and agrees to implement both design determined as well as behavioral directing programs to insure that this does not happen. The central issues are: a.) Oil and gas leaks and spills. b.) Leakage of the active chemicals found in anti-fouling bottom paints. c.) "Wolmerized" substances placed in marine piling which, over time, leak into the water column. d.) Shading of shoreline bottom communities due to the installation of docks with associated floating boats. and e.) Physical, one-time, impacts occurring during the installation of pilings and dolphines. The applicant, wishing to minimize potential onetime (sic) as well as cumulative impacts proposes the following: The applicant will attach to documents/lot sales contract a notice that clearly informs the prospective land owner of his/her responsibilities regarding the use and storage, handing and disposal of hazardous wastes, especially boat fuel and oil. This document will warn residents against the discharge overboard of bilge water known to contain fuel/oil mixtures. Each dock will display, in a prominent mannor (sic), a sign with essentially the same warning. The Pelican Inlet property owner(s) will also develop, and have in place and operational, prior to any authorization for the construction of boad (sic) docks, an emergency response program designed to handle in-project fuel spells (sic). This program will include the storage of equipment suitable for emergency containment until, and if necessary, a local response can be made by the appropriate Lee County and/or state officials. Boats will be lifted, when not actively in use, via davits or elevating hoist platforms completely out of the water. This will minimize water/hull contact in the case of anti-fouling paints and bottom coatings. Dock pilings and dolphines will utilize non-toxic structural components, wolmerized and other petroleum based substances will not be allowed to come in contact with the water column. Such Structural members as concrete or PVC or other known non-toxic items will be utilized for all vertical supports. Dock access platforms/boardwalks will be minimized, this in order to reduce potential shading. Consideration will be given to the use of translucent "boards" now on the construction market, this again to further minimize shading. By Department letter of February 15, 1993, the Department addressed continuing and additional concerns related to project impact. Paragraph 9 of the letter states: Regarding the issue of boat access from the canal out to Pine Island Sound, it should be noted that [the Petitioner agent's] access study was done at a time when the water elevation was provided as +1.91' NGVD. The mean high water elevation, as provided, is +1.47' NGVD. Thus is appears that at mean high water, there will be a little more than 5 inches less water that what was present during that study. The mean low water elevation provided is -1.2' NGVD which seems low. However, using this figure, at mean low water there will be 3' less water between the canal and the sound. Using a more reasonable tidal range of approximately 1', there would still be a difference of almost 1.5' between the observed and the low water levels, yielding lowest depths of approximately 3" in segment 1, the unvegetated areas, 10" in segment 2, where turtle grass and shoal grass...exist within the "channel", and 24" or greater out in the sound (along the sampled channel). The Department's own informal depth survey, taken during a full moon low tide, showed water depths of approximately 3" to 6" in segment 1 and 10" to 36" (in the remnant channel) along segment 2. Most importantly, many of the shallow areas in segment 2 showed dense seagrass growth, especially out by the "island headlands", where no channel exists and where prop scarring of the grassbeds already appears to be a major problem. Also, the shallowest area, segment 1, where turbidity would be expected to occur almost every time a boat went through until the channel was prop dredged, was observed to be a highly productive and diverse area, despite the fact that it is unvegetated. Other concerns which this site visit brought up include the potential for increased erosion of shorelines adjacent to the proposed channel, and disturbance of wading bird rookeries or roosting areas along the channel's path. Reasonable assurance that boats crossing the areas between the canal and the sound will not cause violations of water quality, including turbidity and loss of diversity, and loss of non-mitigable wetland resources, seagrass beds, has not been provided. Without this, a permit may still not be issued for this project. By response dated April 11, 1993, the Petitioner responded to the Department's December 17 letter. As to the conflicting high water calculations, the Petitioner offered a further refinement of the figures and noted: Both of the above are relatively minor corrections and any reasonable person would still agree that water depths along the recommended boating channel corridor are, at best, minimal. Only one with local knowledge and possessing common boating skills and sense would be able to navigate the passage without disruption or damage to the bottom habitat. As to the application of a 1' "tidal range," the Petitioner suggests that the Department meant to identify the figure as the range below mean sea level. Citing to 1993 tidal tables, the Petitioner recalculated the water depths and opined that the lowest depth in segment 1 would be 6.7", in segment 2 would be 21.1" and in segment 3 would be over 30". The Petitioner noted that the calculations did not account for neap or spring tides, periods of even lower water conditions. As to the Department's informal depth survey showing water depths of approximately 3" to 6" in segment 1 and 10" to 36" (in the remnant channel) along segment 2, the response states "[t]hese value ranges and conclusion seem reasonable to the applicant. Only after a series of repeated depth measurements have been taken over a variety of tidal and weather conditions (e.g. wind speed and direction) would a more detailed analysis be available. " As to the Department's statement concern for potential increased erosion of shorelines adjacent to the proposed channel, and disturbance of wading bird rookeries or roosting areas along the channel's path, the Petitioner responded as follows: The applicant previously agreed to a mandatory "no wake, slow speed" zone condition within segments I, II, and III out past the western most headlands to a position due north of Cork Island. Signs along the proposed boat corridor would notify boaters of this and other environmentally related restrictions. Disturbances to in place bird rookeries during the nesting season are of concern in southwest Florida. Parents frightened off active nests do greatly decrease the success for fledging of subadult birds. Generally rookeries occur on islands rather than headlands, thus the applicant would committ (sic) to a vigerous (sic) environmental sensitivity education program directed towards project initiated boaters in order to gain citizen appreciation, support and consideration for island areas of nesting wading birds. Part of the on-going monitoring that the applicant commits to would also track near-shore rookeries in the vacinity (sic) of the proposed boat traffic corridor. As to the Department's statement that reasonable assurance that boats crossing the areas between the canal and the sound would not cause violations of water quality had not been provided, the Petitioner responded as follows: The issue and standard, reasonable assurance, is very difficult to meet, however the applicants proposed residential project design is sensitive to on-site and near shore environmental conditions in the following mannor (sic): The applicant is aware that without full cooperation,, support, appreciation and participation by the future project resident boat operators there will defintly (sic) be negative impacts to the tidally related natural resource base. The natural resource setting is the major selling point for prospective owners and its continued health and sustainability is a good business practice Toward these ends the applicant clearly committs (sic) to: The marking and maintaining of a path along which all boat traffic must follow when exiting or entering the near-shore boat corridor lane. Placement and maintaining of a series of informational "No Wake, Slow Speed" signs along the required boat corridor out to just north of Cork Island. A mandatory requirement stating that all resident owned boats, proposed to enter and exit the site will: Be restricted to a maximum hull draft of 20 inches. Will possess adjustable hydraulic motor/shaft outdrive lifts. Predevelopment base-line and post development monitoring of the conditions and any changes, of the benthic habitats along and adjacent (250' on either side of the centerline) to the proposed boat corridor. This monitoring, with quarterly reports, will continue for five consecutive years. By letter dated May 19, 1993, the Department replied in relevant part to the Petitioner's response as follows: ...The second issue is that of navigable access from the canal to Pine Island Sound. The one specific point to be made here is that a proposed draft restriction of 20" to cross an area as shallow as 6.7" (using your figures) at mean low water is not acceptable as this would cause scarring even when a motor was not in use. More general concerns, as previously discussed, involve whether or not placement of no wake signs, deed restrictions requiring outboard lift units and maximum keel drafts, and monitoring to document boating impacts on adjacent resources provide reasonable assurance that impacts will not occur, and if they do occur, they can be offset. Currently, the Department's view is that only by strict legal (e.g., conservation easement) and physical (e.g., pilings at the end of the canal) measures can impacts to the adjacent OFW resources be avoided or minimized. If there is new information concerning this aspect of this project which demonstrates to the Department's satisfaction that there will not be impacts associated with boat traffic or that these impacts can be offset, then please submit such, since this is not considered a closed issue. " By letter dated June 2, 1993, the Petitioner responded to the Department's May 19 letter. Paragraph 2 of the response states: Our client has agreed to put his half of the canal in a conservation easement without limiting the future construction of boat docks and the ability to obtain a permit for dredging maintenance of the canal. Also, he agreed to drive draft restricting pilings at the west end of the canal. In order to do this, our client is trying to get in touch with the owner of the south half of the existing canal. The construction of these pilings will depend on the adjacent lot owner's response. If required the "No Wake" sign will be installed. Deed restrictions requiring outboard lift units and maximum keel drafts will be provided." The adjacent lot owner is not cooperative with the Petitioner. The evidence establishes that permitting of this project will lead to increased boat traffic in the shallow bay, resulting in prop scarring of the bay bottom, erosion of adjacent shoreline, and damage to the wildlife habitat provided therein. The use of a draft restrictor appears to be integral to the Department and to the Petitioner's ability to protect the shallow bay from damage. Although discussed frequently, the Petitioner provided no detailed draft restrictor design until immediately prior to the hearing. The draft restrictor would limit boat passage in or out of the canal mouth unless the water depth was sufficient to prevent harm to the bay bottom. The greater evidence fails to establish that a draft restrictor placed at the opening to the canal into the shallow bay is sufficient to prevent damage to the bay habitat. Placement of a restrictor only at the mouth of the canal provides no protection to the marine resource once boaters exit the canal and are in the bay. The proposed marking of a "channel" which is marginally sufficient to permit access to deeper waters, fails to protect the resource. A draft restrictor at the canal mouth further provides no protection against damage caused by boaters returning from deeper waters who will be able to travel through the shallow bay before perhaps discovering at the canal mouth that the water is too shallow to permit passage over the restrictor. It is reasonable to assume at that point, the bay will have been damaged by the excessive draft. It is also reasonable to assume that the damage would be exacerbated by the boater who, unable to enter the canal, either exits the too shallow bay, or remains until the water rises sufficiently to permit passage over the restrictor. The evidence fails to establish that it is possible to police the users of the bay to provide that due care is used to prevent bay damage. The Petitioner asserts that the bay is already being used and damaged by other boaters. Even if correct, this project must meet the applicable criteria to be permitted. As set forth herein, the criteria are not met. Based on the evidence and on consideration and balancing of the following criteria, the project is not clearly in and is contrary to the public interest: WHETHER THE PROJECT WILL ADVERSELY AFFECT THE PUBLIC HEALTH, SAFETY, OR WELFARE OR THE PROPERTY OF OTHERS-- The Department does not assert that the project will adversely affect the public health, safety, or welfare or the property of others. WHETHER THE PROJECT WILL ADVERSELY AFFECT THE CONSERVATION OF FISH AND WILDLIFE, INCLUDING ENDANGERED OR THREATENED SPECIES, OR THEIR HABITATS-- The evidence establishes that the project will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats. Pine Island Sound provides habitat for endangered species including manatees, roseate spoonbills, and wood storks. Additionally, bald eagles have been seen in the project site and Pine Island Sound. The direct loss of wetland habitat resulting from this project will adversely affect the conservation of such species. The Petitioner presented no credible evidence to the contrary. The increased boat traffic which may reasonably be expected to result from award of the permit sought will cause damage to the shallow bay waters and result in harm to the health and function of the bay habitat. WHETHER THE PROJECT WILL ADVERSELY AFFECT NAVIGATION OR THE FLOW OF WATER OR CAUSE HARMFUL EROSION OR SHOALING-- The Notice of Permit Denial suggests a likelihood of turbidity-related water quality violations which could result from unstabilized fill, the adverse floristic impact caused by fill washout into adjacent wetlands, the loss of the filtering benefits provided via the filled wetlands and the adverse impact on wildlife habitat. The evidence establishes that the parties have resolved concerns related to the mitigation of the wetlands lost and impacted by the fill. The Department does not currently assert that the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling. The greater weight of the evidence establishes that the project will increase travel through the shallow bay to adjacent waters by boaters residing in the project. The prop dredging which will occur in the shallow water will result in harmful erosion of the bay bottom. WHETHER THE PROJECT WILL ADVERSELY AFFECT THE FISHING OR RECREATIONAL VALUES OR MARINE PRODUCTIVITY IN THE VICINITY OF THE PROJECT-- The project will likely result in an increase in the number of boaters utilizing the bay and adjacent waters. The turbidity caused by prop dredging in the bay will degrade the water quality and adversely affect the productivity of the impacted marine resource, in turn reducing the fishing values in the vicinity of the project. The Petitioner presented no credible evidence to the contrary. WHETHER THE PROJECT WILL BE OF A TEMPORARY OR PERMANENT NATURE-- The project will cause a permanent alteration to the existing condition of the property and will cause a continuing adverse impact to the affected area. WHETHER THE PROJECT WILL ADVERSELY AFFECT OR WILL ENHANCE SIGNIFICANT HISTORICAL AND ARCHAEOLOGICAL RESOURCES UNDER THE PROVISIONS OF S. 267.061-- The Department does not assert that this project will adversely affect or will enhance significant historical and archaeological resources. THE CURRENT CONDITION AND RELATIVE VALUE OF FUNCTIONS BEING PERFORMED BY AREAS AFFECTED BY THE PROPOSED ACTIVITY-- The current condition and relative values of the functions being performed in the affected areas will be adversely affected by the granting of this application. The project will result in an adverse impact to and degradation of an Outstanding Florida Water. The Petitioner presented no credible evidence to the contrary. The evidence establishes that adverse secondary and cumulative impacts will result from permitting this project. Aside from the adverse affect of increased boating related to residents of the development, it is reasonable to expect that similarly-situated applicants could seek permits under these circumstances, resulting in additional boating activity and related damage to an Outstanding Florida Waterbody.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Environmental Protection enter a Final Order denying the application of Pine Island Properties, Ltd., for a water quality certification permit in DEP File No. 362004755. DONE and ORDERED this 28th day of March, 1994, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of March, 1994. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 93-2713 The following constitute rulings on proposed findings of facts submitted by the parties. Petitioner The proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 1. Rejected, unnecessary. 12. Rejected. Evidence is insufficient to determine whether use of bay by public is "regular." Rejected. The map attached to the application identifies 23 homesites. The Notice of Permit Denial references 23 homesites. Petitioner's exhibit 92 is a set of drawings which indicate 24 homesites, however it is unclear as to why the lots were replatted. Rejected as to reference to South Florida Water Management District, irrelevant. Rejected, subordinate. Rejected The greater weight of the evidence establishes that the project is contrary to public interest. Rejected, argumentative, subordinate. Rejected, irrelevant. Rejected, the greater weight of the evidence establishes that this was the first detailed drawing of the draft restrictor. 32-33. Rejected, irrelevant as to whether project meets permitting criteria. 37-38. Rejected, unnecessary. 39-40. Rejected. The evidence fails to establish that filling in the canal is the "only solution" suggested by the Department. 42. Rejected as to assertion that the Department did not question the conclusion or accuracy of the Petitioner's water depth study, contrary to evidence including the Department's site visit. The conclusion to which the Department agreed is that "local knowledge, proper tidal conditions and informed operators would be essential to a safe and non-habitat damaging passage from the canal mouth to the deeper waters of Pine Island Sound." Rejected, contrary to the greater weight of evidence. Rejected, contrary to the greater weight of evidence. The Department noted in correspondence that monitoring would not protect the resource. 46-48. Rejected The easement has not been executed or recorded. Rejected. Contrary to the greater weight of the evidence. Nothing in the correspondence indicates that all other issues have been resolved. Rejected, immaterial. 56. Rejected, irrelevant. The easement has not been executed or recorded. 57-58. Rejected, immaterial. 60-61. Rejected. Contrary to the greater weight of the credible and persuasive evidence. The testimony of the cited witness is not credited. 62. Rejected, immaterial. Respondent The proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 15. Rejected, contrary to the greater weight of the evidence. There is no citation to record to support the recalculation. 23. Rejected, contrary to evidence which establishes that the Notice of Permit Denial was issued on March 12, 1992. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Harry Blair, Esquire BLAIR & BLAIR, P.A. 2138-40 Hoople Street Fort Myers, Florida 33901 John L. Chaves, Esquire Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-9730

Florida Laws (3) 120.57120.68267.061