BEN JOHNSON AND COASTAL DEVELOPMENT CONSULTANTS, INC. vs FRANKLIN COUNTY BOARD OF COUNTY COMMISSIONERS, 94-002043DRI (1994)
Division of Administrative Hearings, Florida Filed:Apalachicola, Florida Apr. 14, 1994 Number: 94-002043DRI Latest Update: Mar. 19, 1997

The Issue The issues to be resolved in this proceeding concern whether the Petitioners should obtain an amendment to a development order which would allow multi-family residential development on the property of the Petitioners, presently designated as commercial property, on St. George Island, Franklin County, Florida. Included within that general issue are questions involving whether the proposed amendment is a "substantial deviation" from that 1977 development order, what vested rights, if any, the Petitioners have to develop their property, and whether the development, as proposed and as delineated in the testimony and evidence, is consistent with the development order and any vested rights thus acquired by the Petitioners.

Findings Of Fact A development order (DO) was approved by the County on September 10, 1977 providing for a DRI for approximately 1,200 acres of property on St. George Island in Franklin County, Florida. The 1,200 acres to which the 1977 DO relates is not contiguous. It is separated into two parcels, one of which is located on the east end of St. George Island, adjacent to the state park, which contains 33-1/3 acres designated as "commercial". It is identified as the "Sunset Beach Commercial Area" in that 1977 DO. That same area is also referred to as Three Hundred Ocean Mile, Gorrie Ocean Mile, or Sunset Beach. The remaining portion of the 1,200 acres is located between 12th Street West and the Bob Sikes Cut, and is generally referred to as the "Plantation". The Plantation DRI property is divided by the 1977 DO into both residential and commercial areas. There are two designated commercial areas in the Plantation property, one of which is adjacent to Bob Sikes Cut and is approximately 100 acres in size. The other commercial area is approximately 150 acres in area and is referred to as the "Airport Commercial Area" or the "Nick's Hole Commercial Area". These areas are collectively referred to in the 1977 DO as the "Plantation Commercial Areas". The remainder of the Plantation DRI property consists of 900 to 1,000 platted, residential lots designated as "Residential Areas". Approximately 250 of these lots are already developed with single- family residences. The Petitioners are successor-in-interest to a portion of the Plantation property, owning approximately 58 acres within the Airport or Nick's Hole Commercial Area. This property is hereinafter described as "Petitioners' Property" and is depicted in Exhibits 9, 17, 18 and 19 adduced by the Petitioners. The 1977 DO limits the total commercial area which can be developed to not more than 200 acres even though a larger portion is commercially designated. Thus, the development of the 58 acres at issue in this proceeding will not result in the limit in the 1977 DO being exceeded. The 1977 DO authorizes commercial development within the Plantation Commercial Areas, shown by page 5 of the Petitioners' Exhibit 2 in evidence. The 1977 DO thus provides that the commercial areas shall include one or more high quality resort hotels and motels, with affiliated uses such as tourist shops, restaurants, recreational amenities and similar activities. The 1977 DO provides that because specific plans for the two areas were indefinite at the time of the enactment of the 1977 DO, those areas would not be re-zoned at that time; but re-zoning of the areas would be granted upon final approval of the plans by the Respondent, "which approval shall not be unreasonably withheld". "Condominiums and multi-family residential structures shall not be allowed in any of the areas shown by Exhibit "A" without the prior consent of the Respondent. Before development is commenced in the commercial areas, plans and specifications for the site clearing and construction shall be submitted to the Respondent for review and approval. Upon such approval, the specific area in question shall be re-zoned to allow the requested land use." The 1977 DO has been amended several times. Two of the amendments enacted in 1985 and 1987 specifically authorize condominium and multi-family residential development within the Plantation Commercial Areas. The Franklin County zoning ordinance, Ordinance No. 75-7 (Zoning Ordinance), was in effect on September 20, 1977, when the 1977 DO was enacted. The Ordinance authorized condominium and multi-family residential development as part of the "commercial designation" applicable to St. George Island in the Plantation Commercial Areas. A "Tourist Commercial District" is established in Section 630 of the Zoning Ordinance, and this land use is specifically applicable to the islands within Franklin County. Section 631 of the Ordinance includes within the "Principal Permitted Uses" hotel, motel, restaurant and gift shops and all uses within R-2 multi-family districts. Section 520 of the Zoning Ordinance, "Multi-Family Residential District", sets forth principal permitted uses, which include "multiple dwellings including townhouses, apartment houses . . .". The Petitioners acquired their 58-acre parcel in 1991 after the entry of the 1977 DO and the two amendments referenced above. Exhibit "D" to the 1977 DO is depicted in Petitioners' Exhibit 3 in evidence. This exhibit, which includes the Petitioners' property, has been recorded in the Franklin County Public Records since 1977. The exhibit indicates the intensity of the contemplated development approved for the Petitioners' property. The portion south of Leisure Lane reflects the following densities: 525 to 675 hotel rooms; food and beverage outlets and other amenities associated with those hotel rooms; 65,000 to 82,000 square feet of resort shops and commercial business use; and 685 surface parking spaces (in addition to the parking spaces which would be located below the hotel). Those densities were calculated based upon the coverages depicted on "Exhibit D". The figures do not include that portion of the Petitioners' property north of Leisure Lane, which was also approved for commercial development. The Proposed Development "Resort Village", the proposed development, would consist of residential and multi-family development, hotel and inn and related commercial uses, such as retail shops and restaurants. Recreational amenities would be provided, such as a club house, swimming pool, tennis courts, racquetball courts and exercise facilities. The amenities would be available to surrounding property owners, as well. St. George Island is a resort vacation area, and the proposed development in Resort Village would be compatible with those uses. Approximately 150 of the 250 developed homes in the Plantation are in rental programs. The Franklin County Comprehensive Plan and its land use goals, objectives and policies includes a "mixed-use residential" land use category, limited to developments such as DRI's. That category includes recreational, commercial, retail, office, and hotel and motel development, as well as multi- family residential uses. That category is very similar to the description of the Plantation Commercial Areas contained in the 1977 DO. Resort Village is the only parcel remaining in the Plantation area available for this type of development. The Petitioners in the St. George Plantation Owners Association, Inc. entered into an agreement in October, 1992 providing for certain density and other restrictions on the Petitioners' property. These restrictions include density limitations of 3.9 residential units per gross acre; 19.5 hotel units per gross acre; and 12,000 square feet of miscellaneous commercial development per gross acre. The Petitioners also agreed not to exceed a 35-foot height limitation which was less than that previously approved by the County in the Plantation Commercial Areas. The development restrictions agreed to by the Petitioners are more stringent than those previously approved for development in the Plantation Commercial Areas and allowed-for by the County zoning code in effect in 1977 or currently authorized and allowed in commercial and multi-family developments in the County. The Petitioners have also agreed to limit the total impervious surface area to no more than 40 percent; to maintain a 50-foot buffer adjacent to wetlands; to maintain a large portion of the 58 acres in its naturally- vegetated state and not to seek permission to develop any of the DEP "jurisdictional wetlands" adjacent to Apalachicola Bay. Thus, all development will be on uplands without any permitting sought or development in wetlands and waters of the State. Character of Prior Development Approvals In the 1985 amendment to the 1977 DO, the County approved the mixed- use development of 352 multi-family units on 76.5 acres and a hotel conference center of 386 hotel units on 11 acres. The 1987 amendment approved by the County re-affirms a permitted development of the 352 multi-family units on 76.5 acres, and includes a resort-convention center/hotel with 250 units, a marina/motel with 40 units, and a "harbor house", consisting of 60 units, as well as the other authorized development. Additionally, the County approved, and there was constructed in the early 1980's, two projects in the commercial district in the center of the Island: The Villas of St. George, with a density of approximately 16.6 multi-family units per acre, and the Buccaneer Inn, with a density of approximately 44 hotel/motel units per acre. On September 2, 1981, the County approved a mixed-use development in the Sunset Beach Commercial Area in close proximity to the Bay, consisting of 252 multi-family residential units and 150 motel units, a density of nine multi-family units per acre, and 25 hotel/motel units per acre. Additionally, the Respondent recently authorized single-family residential units in this area. The Buccaneer Inn, the Villas of St. George, and the Sunset Beach development all have more dense development than Resort Village would have, with a higher percentage of impervious surface, leaving very little natural vegetation. The Respondent recently approved and took an active role in encouraging and facilitating residential developments served by aerobic septic systems in the commercial district in the center of the Island. It did so by granting a variance for setbacks and an easement for waste water purposes. The densities for these developments are 4.3 residential units per acre, greater than the 3.9 residential units per acre the Petitioners have voluntarily imposed as a restriction on their property. Reliance on Prior Approvals The Petitioners, prior to acquiring the property, studied and researched the public records of Franklin County and other documents and did considerable investigation to become familiar with the 1977 DO, as well as the 1985 and 1987 amendments and what was allowed pursuant to those amendments. Additionally, the Petitioners had conversations with Alan Pierce, the Franklin County Planner, concerning the development of their property both prior to and after purchasing the property. In one conversation with Mr. Pierce prior to purchase, the Petitioners were advised by Mr. Pierce that in order to develop the Resort Village concept, the Petitioners would be better advised to acquire "commercially-designated" property within the Plantation, instead of trying to get single-family lots re-zoned. There is no evidence that the Petitioners were placed on notice by any documents or communication from Franklin County officials that they would not be able to develop the Resort Village proposal on their property. After purchasing the property, the Petitioners continued communicating with Mr. Pierce and other Franklin County officials. Mr. Pierce was aware that the Petitioners were expending considerable resources in attempting to secure the necessary government permits and approvals, as well as doing market research, real estate development planning, and other activities related to the parcel in question. The Petitioners expended in excess of $500,000.00, as a result of their efforts in the preparation for development of the Resort Village, including fees to engineers, attorneys, architects, and various environmental specialists and consultants, as of December 1993. Development Review Process Under the 1977 Development Order The 1977 DO provides that it "is consistent with the local land development regulations of Franklin County, Florida." The DO contains "conceptual land plans", which are incorporated and made a part of the DO. The conceptual land plans are contained in "Exhibits A-F" to the 1977 DO. Two of the exhibits, "Exhibit A" and "Exhibit D", contain the conceptual plans for the development of the Petitioners' Property. The 1977 DO does not expressly set forth the specific densities for development of the Petitioner's Property, but the intensity of the contemplated development for a portion of the Petitioner's Property is shown on "Exhibit B" to the 1977 DO, as further described above. If the Petitioners had not sought an amendment to the 1977 DO to include multi-family use, they would have simply submitted a specific site plan to the Respondent "for review and approval". Upon approval of the site plan, the Respondent would automatically re-zone the property as applicable. The automatic re-zoning of the property was re-confirmed at the Respondent's June 8, 1981 board meeting. See, Petitioners' Exhibit 15, page 3, in evidence. If at the time the site plans are approved, state or federal approvals are still necessary, the Respondent is required to cooperate with the Petitioners in obtaining those approvals, as long as substantial, adverse data is not developed with regard to environmental damage and as long as cooperation does not require the expenditures of monies by the County. Since the Petitioner sought an amendment to the 1977 DO, pursuant to Section 380.06(19), Florida Statutes, to allow multi-family uses, the Petitioners address these issues as part of the Chapter 380, Florida Statutes, process, prior to submitting a detailed site plan. Franklin County's Development Review Process In order for commercial development to be effective in Franklin County, a site plan must be submitted for review and approval to the Planning and Zoning Commission. The Commission checks to insure compliance with setback requirements, parking requirements, impervious surface area, and other criteria set forth in Franklin County's ordinances. Information is also provided in the site plan approval process with regard to the treatment of waste water and the treatment and detention of storm water. After site plan approval, an applicant must next obtain any necessary waste water permits from either HRS or DEP, depending on the size of the project. A storm water permit from DEP must be obtained and a certificate from the utility system that potable water is available for the development. After these permits are obtained, an applicant must submit building plans and a building permit can then be issued. Franklin County has not adopted a process whereby it independently studies or evaluates the impact of the DRI. Franklin County relies upon the state permitting and regulatory process for that data. Waste Water and Storm Water The 1977 DO specifically addresses "sewage treatment and drainage control" and requires assurance that the planned development "will not cause pollution of Apalachicola Bay or other environmental damage". Under the 1977 DO, waste water treatment should be addressed at the site plan stage, which can occur before any or all of the permitting processes begin. The Petitioners presented considerable testimony regarding both the pending waste water treatment permit and the manner in which storm water would be addressed. Waste water will be treated by an advanced waste water treatment system (AWT). It will be a municipal-type facility with Class I reliability and will be of a higher quality than any similar facility in Franklin County. The AWT plant provides the highest level of treatment available for domestic waste water. It will remove approximately 93 percent of the nitrogen content, 91 percent of the phosphorus, and 97 percent of the bio-chemical oxygen demand in the waste water effluent. Contrastingly, aerobic septic systems remove typically 13 percent, 0 percent, and 50 percent of the nitrogen, phosphorus, and bio-chemical oxygen demand, respectively. The Petitioners propose to build the AWT plant in 30,000-gallon phases. They will install aerobic septic systems during the first years of development, until enough waste water is generated to efficiently operate the AWT plant. This will require a flow of approximately 5,000 gallons per day. The Petitioners have agreed to start construction on the AWT plant once 5,000 gallons of waste water is being generated and to disconnect all aerobic systems, once a permit to operate the treatment plant is issued by DEP. The Petitioners have also agreed not to exceed 10,000 gallons of flow at any time on the aerobic system. In order to dispose of treated effluent, the Petitioners propose to use three sub-surface absorption cells. These will be used on a rotating basis so as to minimize the amount of effluent which will percolate to the ground water at each location. There is considerable testimony regarding the importance of Nick's Hole to the Apalachicola Bay ecosystem. The Petitioners' property does not actually border Nick's Hole, but is in close proximity to it. The relative location of Nick's Hole and the Petitioners' property is depicted on Exhibit 9 in evidence. Unrefuted testimony by the Petitioners' expert witnesses, Gary Volenec and Steve Leitman, established, through their ground water study, that none of the waste water from the Resort Village development would migrate to Nick's Hole or to the marshes adjacent to it. Twenty percent of the ground water, at most, might eventually migrate toward the marsh and the Pelican Point Bay area, east of the airport and north of the Petitioners' property, with at least 80-90 percent of the treated waste water migrating toward the Gulf, in accordance with the ground water gradient in the area of the Petitioners' property. These studies did not require a specific site plan in order to be conducted accurately. Rather, they depend solely on the location of the absorption fields, as proposed, and the flow of the ground water, as revealed by the ground water study. It must be remembered that DEP, through its permitting process, has ultimate control over the specific location of the absorption fields, their configuration, construction, and manner of use and operation, as is true of the waste water plant itself. After the waste water plant is constructed, the underground water, as part of the operating permit of the plant, will be constantly monitored, as will the operation of the plant. If problems arise, constituting adverse effect or the potential thereof on the ground water or surrounding surface waters, which cannot be immediately remedied, the DEP has the authority to shut the plant down. The volume of water flowing from the Apalachicola River into the Bay is approximately a minimum of 16 billion gallons per day. The average daily rainfall on Pelican Point Bay and the surrounding wetlands is 296,000 gallons, if apportioned on a daily basis. The amount of water flowing in and out of the Pelican Point Bay/Nick's Hole area with each tidal exchange is approximately 72 million gallons. If it be assumed that the maximum amount of treated waste water, which would be 120,000 gallons per day if development were effected without the proposed multi-family amendment (which would reduce that maximum amount to 90,000 gallons per day) and the maximum percentage of migration to Apalachicola Bay (20 percent) occurred, the maximum amount of water eventually getting into Apalachicola Bay after treatment would be 24,000 gallons per day. However, if the multi-family amendment were adopted and the Petitioners' proposed development proceeded accordingly, the maximum volume of water generated from Resort Village would be reduced to 18,000 gallons per day (90,000 GPD x 20 percent = 18,000). The Intervenor expressed much concern that the sewage treatment plant would be located in a flood-prone area. This is not relevant concerning the addition of multi-family development to the permitted development on the property since, even if no amendment were sought and development proceeded as presently allowed under the 1977 DO, as amended, a waste water treatment plant treating as much as 120,000 gallons per day would be necessary. In any event, however, the Petitioners would be required to address such flooding concerns as part of the permitting process regarding waste water and storm water permits sought from the DEP at the appropriate time. Further, the critical components of the plant, including absorption cells, are required by the DEP to be well- elevated so that they can withstand the most severe storm events. The Petitioners' expert witness, Randall Armstrong, testified as to how Resort Village's storm water plan would be designated and permitted. Since the Petitioners' property is on Apalachicola Bay, a Class II designated water, as well as an outstanding Florida water, the DEP has specific storm water requirements which have to be met before a permit can be issued. Although the detail or design for the storm water system is dependent on formal site plans, it is represented by the Petitioners that all storm waters will be captured, allowed to percolate into the ground, and that no storm water will be accumulated and discharged into the waters of the Bay or the Gulf. Ultimate approval of the amendment by Final Order in this proceeding should be conditioned on a binding agreement between the parties concerned to that effect. However, for areas that will remain in their natural state, even after development on the property, the flow patterns for storm water will not change. The Respondent and the Intervenor are also concerned that storm water, under certain conditions, might flow from the Petitioners' property across the airport and into the marshes adjacent to Nick's Hole, even in the present, undeveloped condition. If that, in fact, occurs, the development of Resort Village will not alter that, for areas which remain in their natural state. If development occurs near or adjacent to the airport, any storm water will be captured and treated accordingly under the Petitioners' voluntary proposal, in any event. According to testimony in the record, DEP, in both its waste water and storm water permitting and regulatory processes, is keenly aware and sensitive to the location of the Petitioners' property and the importance of activity on that property to the health of Apalachicola Bay. The Petitioners' will not be able to get a building permit to develop the property until the Petitioners have both the waste water and storm water permits. The granting of either of those permits will require extensive scientific investigation and demonstration of reasonable assurances that the various environmental concerns, in terms of water quality, the public interest and cumulative impacts of such projects, as provided in the pertinent provisions of Chapter 403, Florida Statutes, and attendant rules, will not be adversely affected. In any event, the addition of multi-family-type development will have no adverse effect on the issues concerning sewage and waste water treatment and will actually result in a reduction in the conceivable, maximum daily flows versus the development, in the commercial sense, already permitted under the 1977 DO, as amended. Flooding Issues The Respondent and the Intervenor also expressed concerns about potential flooding at the St. George Island site in question. While Richard Deadman indicated in his testimony that DEP had concerns regarding development of the Petitioners' property, such as flooding on St. George Island, Mr. Deadman stated that his concerns were passed on to others in DEP and would be taken into account in the relevant permitting processes. The Respondent and the Intervenor also expressed concerns regarding the impact of the development on hurricane evacuation and traffic densities. The Respondent and the Intervenor's witness, Mike Donovan from the ARPC, testified that the counsel's study showed that Resort Village would have no significant impact on the regional road system, which includes the bridge from the mainland to St. George Island. Potable Water Issues The Respondent and the Intervenor also were concerned regarding the availability of potable water. Based upon the testimony of the Intervenor's witness, John Kintz from DEP, the capacity of potable water for the utility on St. George Island is very near, if not already at, capacity. Clearly, for any additional development to occur within the area served by the St. George Island water utility, whether multi-family, single-family, or commercial development, the capacity of the utility will have to be increased. If not, water hookups will not be available; and, therefore, building permits cannot be granted in Franklin County. The water utility does have an application pending at the NWFWMD to increase its water supply capacity. Fees paid by the Resort Village to the utility will assist it in providing for additional water capacity expansion. The Petitioners already have purchased 15,000 gallons capacity per day from the utility which is enough potable water to serve the project in the first several years of development. The Petitioners will continue purchasing potable water capacity on an as-needed basis as long as it is available and when it becomes available. In any event, if potable water is not adequately available, building permits cannot be granted and the development cannot proceed. In terms of the lower densities, projected sewage flows, restrictions on parking and impervious surfaces, and the other factors delineated in the above Findings of Fact, the Resort Village development will have less adverse impact than the development already allowed by the 1977 DO, as amended, for the site in question. Thus, the Resort Village, as proposed by the Petitioners will not constitute a substantial deviation from the types of development activities permitted by that 1977 DO, as amended. Although concerns were expressed by a number of witnesses, and by the Respondent and the Intervenor, concerning the potential pollution of Apalachicola Bay or other environmental damage to the Bay and its ecosystem, no preponderant testimony or evidence was presented which could establish that the development of Resort Village would cause such pollution or environmental damage. Such concerns will be thoroughly addressed in the permitting and regulatory processes, for the various permits referenced above, in any event. The Resort Village, however, was demonstrated to have no additional adverse impact on any waters, wetlands or ground water subject to state regulation, in addition to or different from that posed by the uses already permitted by the 1977 DO, as amended.

Recommendation Based on the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties it is RECOMMENDED that a Final Order be entered by the Florida Land and Water Adjudicatory Commission which: Supersedes the January 4, 1994 order in its entirety; Amends the 1977 Development Order to specifically allow multi-family use for the Petitioners' Property in the manner proposed by the Petitioners; Determines that the amendment to this 1977 Development Order does not constitute a substantial deviation under Chapter 380, Florida Statutes; Determines that the Petitioners have vested rights to develop their property at the densities and intensities of use proposed, subject to issuance of appropriate permits for storm water and waste water treatment construction and operation, site plan approval by Franklin County, and which incorporates the voluntary agreements and restrictions entered into by the Petitioners with the adjoining property owners; Requires Franklin County to follow the same procedures and guidelines in the site plan approval process and building permit process for development of the Petitioners' Property as it does for every commercial or multi-family developments in Franklin County, Florida. DONE AND ENTERED this 11th day of January, 1995, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of January, 1995. APPENDIX TO RECOMMENDED ORDER, CASE NO. 94-2043DRI Petitioners' Proposed Findings of Fact The Petitioners' proposed findings of fact are accepted to the extent they are not inconsistent with those made above by the Hearing Officer. They are rejected to the extent that they are so inconsistent, as being unnecessary, immaterial, or not supported by preponderant evidence of record. Respondent's and Intervenor's Proposed Findings of Fact The Intervenor's proposed findings of fact have been adopted by reference by the Respondent. 1-9. Accepted, but not necessarily material to resolution of the issues presented to the Hearing Officer. Accepted. Rejected, as not entirely in accord with the preponderant weight of the evidence as developed at hearing. 12-15. Accepted, but not entirely as to materiality inasmuch as this is a de novo proceeding with resolution of the issues presented dependent upon evidence adduced at a de novo hearing. These proposed findings are, in essence, illustrative of the procedural history of this case. 16-30. Accepted, to the extent that they actually constitute proposed findings of fact, and rejected to the extent that they merely constitute recitations of testimony. Although they are accepted, the concerns expressed are not material to the narrow range of issues presented in this proceeding, as opposed to the permitting proceedings to come concerning the storm water and waste water construction and operation permits which must be sought from the DEP. Moreover, the feared impacts which the concerns expressed in proposed findings of fact 16-30 relate have not been proven by preponderant evidence in view of the character of the proposed development, the decision by the developer not to seek permitting or to do any development in jurisdictional wetlands and in view of the less dense and intense type of development proposed herein versus that already permitted in terms of commercial designated use already allowed by the 1977 Development Order. Thus, these proposed findings of fact are largely irrelevant and immaterial to the issues presented in this particular proceeding. 31-35. Rejected, as constituting largely recitations of testimony, rather than proposed findings of fact, as being immaterial, in part, to the specific issues presented for resolution in this proceeding, as delineated in the above Findings of Fact and Conclusions of Law made by the Hearing Officer and as subordinate to the findings of fact in these particulars made by the Hearing Officer. They are largely irrelevant due to the discussion and conclusions of law made by the Hearing Officer, which are predicated on the Hearing Officer's findings of fact supported by the preponderant evidence of record. COPIES FURNISHED: Ms. Barbara Leighty Florida Land & Water Adjudicatory Commission Executive Office of the Governor 426 Carlton Building Tallahassee, FL 32301 Mr. Thomas H. Adams P.O. Box 791 Eastpoint, FL 32328 Al Shuler, Esq. P.O. Box 850 Apalachicola, FL 32329 L. Lee Williams, Jr., Esq. P.O. Box 1169 Tallahassee, FL 32302-1169 Mr. Tom Beck Bureau of Land and Water Management Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Gregory C. Smith, Esq. General Counsel Florida Land & Water Adjudicatory Commission Office of the Governor The Capitol, Room 209 Tallahassee, FL 32399-0001 J. Ben Watkins, Esq. 41 Commerce Street Apalachicola, FL 32320 William J. Peebles, Esq. 306 E. College Avenue Tallahassee, FL 32301

Florida Laws (9) 120.565120.57120.68163.3167163.3194163.3202380.06380.07380.08 Florida Administrative Code (2) 42-2.0029J-2.025
# 1
UNIVERSAL PRECISION INDUSTRIES, INC. vs TAMPA BAY WATER, A REGIONAL WATER SUPPLY AUTHORITY, 01-000947BID (2001)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Mar. 07, 2001 Number: 01-000947BID Latest Update: May 24, 2001

The Issue The issue is whether Tampa Bay Water's award of a contract to Commerce Controls, Inc. to furnish control panel fabrications for a regional water treatment plant under Contract No. 2001-22 was contrary to competition, arbitrary, or capricious, as alleged by Petitioner.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In this bid dispute, Petitioner, Universal Precision Industries, Inc. (UPI), contends that Respondent, Tampa Bay Water, acted contrary to competition and in an arbitrary and capricious manner when it proposed to award a contract to Intervenor, Commerce Controls, Inc. (CCI), the lowest responsive bidder. In its petition, UPI alleged that CCI failed to include in its bid documents "catalog cuts and information with complete model number, manufacturer's specifications, and dimension drawings describing the proposed component," as required by the specifications. As further clarified at hearing, UPI alleged that CCI deviated from the specifications in a material respect by submitting a price for a "customized-made panel" instead of a higher costing Hoffman panel (encloser), and by submitting prices for a mix of AC/DC surge protectors rather than 100 percent DC surge protectors. All other allegations in the petition have been abandoned. UPI goes on to contend that by CCI pricing out the two items in this manner, CCI gained a competitive advantage of around $36,000.00 over UPI. Tampa Bay Water is a regional water supply authority created and existing pursuant to Sections 163.01, 373.1962, and 373.1963, Florida Statutes, and an interlocal agreement among Pinellas, Pasco, and Hillsborough Counties and the Cities of Tampa, New Port Richey, and St. Petersburg known as the "Amended and Restated Interlocal Agreement Reorganizing the West Coast Regional Water Supply Authority," dated June 10, 1998. In all, Tampa Bay Water is responsible for meeting the potable water needs of approximately two million customers. The controversy began on January 8, 2001, when Tampa Bay Water issued an Invitation for Sealed Bids for Contract No. 2001-22 for the fabrication of certain control panels and associated parts for a regional water treatment plant. In paragraph 2 of the Instructions to Bidders, Tampa Bay Water specifically reserved the right "to waive any and all minor irregularities and technicalities." A mandatory pre-bid conference was held on January 23, 2001. Representatives of UPI, CCI, and Intervenor, Tampa Armature Works, Inc. (TAW), attended the conference and later submitted bids. Thereafter, the sealed bids were opened publicly on January 30, 2001. CCI submitted the lowest bid ($469,481.00), TAW the second lowest bid ($486,144.00), while UPI submitted the third lowest bid ($495,000.00). On February 5, 2001, Respondent announced its intention to award the contract to CCI, who submitted the lowest responsive bid. After efforts to informally resolve the dispute were unsuccessful, this action was filed. The bid documents The Instructions to Bidders required that "[q]uotations for services are to be provided on the Bid Schedule included herein." They further provided that "[p]roposals must be provided on the Bid Schedule included with the contract documents." The Bid Schedule form in the bid documents provided fourteen line items to be completed by the bidders: one line each for each of the seven control panels and one line each for the factory acceptance testing on each panel. The Bid Schedule also provided a pre-determined Owner's Allowance and then a "Total Contract Price" line for the fifteen line items. The Instructions to Bidders further required that "[a]ll quotations must reflect delivered cost which includes all packing, handling, shipping charges, taxes, discounts and delivery to Tampa Bay Water." In a section of the "Conditions of the Contract," the following requirements were imposed: The proposal shall include the following: Catalog cuts and information with complete model number, manufacturer's specifications, and dimension drawings describing the proposed components. Total cost to Owner of all components including a separately itemized freight cost to the project site. Per diem costs, expenses included, for supplying an experienced representative to the project site to assist with startup and operator training. Delivery time of all panels following receipt of purchase order. In the same section of the bid documents, under a heading entitled "Qualifications of Bidders," there is found a requirement that "[t]he Unit Control Panels shall be bid in detail, depicting a base unit price per device, utilizing an Excel spreadsheet supplied to the bidder." Finally, the bid documents contained seven spreadsheets, one for each of the panels, which set forth by line item a description of each component, its function, the manufacturer's name and model number, and the quantity required. The last column of each spreadsheet was blank and was titled "Costs." The purpose of a bidder submitting spreadsheets was to ensure that Tampa Bay Water was getting the specific components identified in those spreadsheets. Therefore, Tampa Bay Water wanted to ensure that the bidder was furnishing the parts specified, but it was not concerned with the manner in which a bidder may have priced any particular components. The specifications also called for a number of surge protectors for each of the seven panels. However, they did not specify whether the protectors would be AC or DC, or the number of each. Because there is a significant difference in price between the two, a few days before the bids were to be submitted, a UPI employee, Frank Dressel, made a telephonic inquiry with James L. Hall, an outside consultant who assisted in the preparation of the specifications, seeking clarification. Hall advised Dressel that he should price out his proposal using all DC surge protectors, even though the specifications were not clear on that point, and he was unsure of the exact number of DC surge devices that would ultimately be used. Hall later conveyed this same advice to all bidders before the bids were submitted. CCI's bid proposal CCI's bid proposal did not include the catalog cut sheets (product specification sheets) or the spreadsheets in its proposal. However, CCI provided a cover letter with its proposal which stated that The bid requirements asked for several items, for which there was no line on the bid form. This proposal addition serves to provide the additional information required. The equipment we are providing is the exact model as specified by Tampa Bay Water, therefore, we have not included the catalog cut sheets or major equipment listing with our bid. We can, if necessary, provide the information. Per diem expenses for an electrician for wiring field terminations to the control panels $336.00, based on an 8 hour day. Per diem expenses for a CCI start-up technician would be $900.00, based upon a 40 hour work week. Freight expenses are $7,000.00. After reading the letter, a Tampa Bay Water representative, Joseph Kehoe, "felt comfortable" with that statement and treated it as a representation by CCI that it would supply the exact parts specified by Tampa Bay Water. In an abundance of caution, however, Kehoe sought guidance from his General Counsel regarding the apparent irregularities in the CCI bid, as well as apparent irregularities in the second lowest bid submitted by TAW. The General Counsel advised that the irregularities appeared to be minor and could be waived, but that further clarification could be sought from the bidders with respect to any of the omitted information. Kehoe then sought clarification from CCI regarding the freight charges and delivery schedule. He also requested the spreadsheets and catalog cut sheets previously offered by CCI in its response. By letters dated February 2 and 5, and March 1, 2001, and a "Supplemental Information" submittal containing the spreadsheets and catalog sheets, CCI provided the necessary clarification. That information confirmed the accuracy of the representations in CCI's January 30, 2001, letter, which indicated that CCI would supply all of the required equipment at the price stated in its bid. UPI's concerns According to UPI's chief financial officer, John Sessa, CCI "did not provide pricing or part numbers to indicate that they were supplying" some of the items required by the specifications. More specifically, three of the seven panels required Hoffman enclosures. In reviewing the CCI proposal, Sessa could find no price quote for a Hoffman enclosure, but he did find a manufacturer's quote for a similar enclosure by another manufacturer, Thermal Designs and Manufacturing (TDM). Also, Sessa was unable to determine whether CCI's bid was based on all DC surge protectors. Therefore, Sessa concluded that CCI was not supplying the Hoffman enclosures or the required number of DC surge protectors. By CCI using lower costing parts in pricing out its bid, Sessa contended that CCI had obtained a competitive advantage over UPI. The prices used for CCI's bid were prepared by Karen R. Lawson, a sales engineer in CCI's Plymouth, Michigan office. Lawson gathered her estimates from catalogs and vendors and then submitted them to her supervisor, Jerry Zitterman, who in turn forwarded them to a CCI employee in St. Petersburg, Florida. Because she either gave the vendor an incorrect part number for a Hoffman panel, or there was a substantial lead time in obtaining such a unit, Lawson used a price for a customized panel made by TDM, and not the price for a Hoffman panel. That price, however, was later adjusted upward by more than 25 percent in the bid proposal, presumably to take into account the labor component. In pricing out the surge protectors, Lawson used an average unit price, which was derived by taking "both prices and [using] an average of those numbers." Notwithstanding the manner in which it had priced out the panel and surge protectors, CCI unequivocally agreed that it was obligated to supply all equipment specified by Tampa Bay Water by manufacturer and part number, and that was the intent of its January 30, 2001, letter included in its bid proposal. At the same time, Tampa Bay Water understood that CCI was supplying all of the items specified in the spreadsheets and that CCI would be held to its bid price as to all of the specified components. CCI's failure to supply the spreadsheets and catalog cut sheets at the time the bid proposal was submitted, and its manner of pricing out the required panels and surge protectors, were minor deviations from the specifications, did not give CCI a substantial advantage over other bidders, and did not adversely affect the interests of Tampa Bay Water. This is especially true here since CCI's bid proposal included a letter which indicated that CCI would provide all required equipment at the stated price. Under the terms of the Invitation for Sealed Bids, Tampa Bay Water properly waived the minor irregularities in order to achieve the purpose of securing the lowest responsible bid. UPI's bid proposal There were a number of irregularities in UPI's bid as well. For example, certain items in the spreadsheets had a dash instead of a price in the "Costs" column. UPI's bid proposal also failed to provide any information as to the per diem costs from an experienced representative to assist with start up and operator training. In addition, UPI changed the indicated quantities for each component in the spreadsheets from whatever Tampa Bay Water had specified to a quantity of one. Finally, as to two of the three different size fuses required for each of its panels, UPI's spreadsheet failed to list a price and showed a quantity of zero. A representative of Tampa Bay Water established that had UPI been the lowest bidder, the agency would have sought clarification from the bidder as to the above items in the same manner that it sought clarification from CCI. TAW's bid proposal TAW's bid also omitted the catalog cut sheets and the spreadsheets, and it failed to provide any information as to freight charges, per diem start up expenses, or delivery schedule. Clarification regarding these items would also have been required, had TAW submitted the lowest bid.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Tampa Bay Authority enter a final order awarding the contract to CCI, the lowest responsive bidder. DONE AND ENTERED this 4th day of May, 2001, in Tallahassee, Leon County, Florida. ___________________________________ DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 4th day of May, 2001. COPIES FURNISHED: Donald D. Conn, General Counsel Tampa Bay Water 2535 Landmark Drive, Suite 211 Clearwater, Florida 33761-3930 Barrie S. Buenaventura, Esquire Tampa Bay Water 2535 Landmark Drive, Suite 211 Clearwater, Florida 33761-3930 Dominick J. Graziano, Esquire Bavol, Bush & Sisco, P.A. 100 South Ashley Street, Suite 2100 Tampa, Florida 33602-5311 Richard A. Harrison, Esquire Allen, Dell, Frank & Trinkle, P.A. Post Office Box 2111 Tampa, Florida 33601-2111 Steven D. Marlowe, Esquire Marlowe & McNabb, P.A. 324 South Hyde Park Avenue, Suite 210 Tampa, Florida 33606-4127 Michael M. MacInnis, Treasurer Tampa Armature Works, Inc. 440 South 78th Street Tampa, Florida 33619

Florida Laws (4) 120.569120.57163.01287.057 Florida Administrative Code (1) 49B-3.002
# 2
JOE BURGESS, EARL KAIMER, KEITH FINLAYSON, ET AL. vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 80-001899RX (1980)
Division of Administrative Hearings, Florida Number: 80-001899RX Latest Update: Dec. 30, 1980

Findings Of Fact The Respondent is a multi-county water management district which was created by Chapter 25270, Laws of Florida, 1949, and which operates pursuant to the provisions of Chapter 373, Florida Statutes. The District is the local sponsor for the federally-authorized "Central and Southern Florida Project for Flood Control" and as such, operates and maintains various water control facilities and impoundments in South Florida, as authorized and constructed by the Federal Government. The jurisdiction of the District encompasses 16 counties in southern and central Florida, from Marion County in the north to Monroe County in the south. Water Conservation Area 2A is one of several water conservation areas within Respondent's jurisdiction and is a part of the federally-authorized Central and Southern Florida Project for Flood Control. On April 13, June 2, August 10, September 26, October 19, and October 20, 1978, the Governing Board of the District held public hearings and workshop meetings to receive comments from the District staff and the general public concerning the proposed "draw down" or alteration of water levels in Water Conservation Area 2A. Notice of the September 26, 1978 public hearing was published in the Florida Administrative Weekly, Volume No. 4, No. 36, on September 8, 1978. By the terms of the notice, the purpose of the September 26th public hearing was: To provide interested citizens with an opportunity to express their opinions and hear testimony regarding the District's proposal to lower the water level in Conservation Area 2A, located in western Palm Beach and Broward counties. The purpose of the draw down is to con- solidate the bottom sediments so that a more flexible water schedule can be begun to preserve the natural Everglades ecology . . . . After considering information received from staff and the general public, the Governing Board entered its "Order" No. 78-12 dated October 20, 1978 containing findings of fact and conclusions of law. This "order" provided, in pertinent part: That the staff take appropriate measures to accomplish the following: A draw down from current high water levels will be initiated October 31, 1978, with the goal of reducing water levels in the central portion of the marsh to ground level by December 31 (about 11.2 feet msl). From this point, water levels shall be allowed to continue to recede to a minimum level of 9.5' by the end of May, 1979. Water levels will be allowed to rise to about 12.5' msl by October 31, 1979. That the staff take appropriate measures to regulate water levels in Conservation Area 2A between 12.5' and 9.5' msl as provided in Paragraph 1. until November of 1981. That the regulation of Conservation Area 2A be carried out in a flexible manner to insure maximum environmental benefits and that adjustments in water level fluctuations and stages may be made predicated upon the environmental response of the Conservation Area 2A ecosystem resulting from the previous year's hydroperiod. That the staff pursue such research and data collection as is necessary to fully document the conditions of the marsh throughout the three year duration of the project. No formal hearings pursuant to Section 120.57(1), Florida Statutes, were requested as a result of the aforementioned workshop, public hearings or agency action embodied in the "order" of October 20, 1978. It is undisputed that Respondent did not comply with the requirements of Section 120.54, Florida Statutes, relating to rule making in issuing its Order of October 20, 1978. Petitioner, Joe Burgess, is the owner of Hinckle's Bait and Tackle Shop on State Road 84 in Broward County, approximately 12 miles from Conservation Area 2A. Petitioner Burgess derives approximately 60 to 70 percent of his business from customers who use Conservation Area 2A for hunting, fishing, and other recreational purposes. In addition, Petitioner Burgess personally uses Conservation Area 2A for hunting and fishing. Petitioner, Keith Finlayson, is an environmentalist who uses Conservation Area 2A for recreational purposes, including fishing, bird watching, observing animals in their natural habitats and flora identification. Petitioner Finalyson uses Conservation Area 2A for recreational purposes approximately two to three times per week. Petitioner, Concerned Citizens for the Everglades, Inc., is a not-for- profit Florida corporation, some of whose members presently use Conservation Area 2A for hunting, fishing, and other recreational purposes. Other members of the organization derive their living from businesses supported by revenues obtained from the general public directly attributable to "use" of Conservation Area 2A. One of the effects of the "draw down" will be to make certain portions of Conservation Area 2A inaccessible by boat during some periods of the year, thereby curtailing recreational and other use of the those areas. Water Conservation Area 2A, and other such areas within the jurisdiction of Respondent, is surrounded by levies and various water control structures and is operated independently of other water conservation areas, which are also surrounded by levies and water control structures. All of the water conservation areas within Respondent's jurisdiction are subject to different and independent water regulation schedules. The evidence establishes that it is not feasible to apply the same regulation schedule to all water conservation areas due to differences in topography. In fact, it is anticipated that a different regulation schedule for Water Conservation Area 2A will be developed after the current three-year draw down period is concluded. Although originally scheduled to commence on November 1, 1978, the "draw down" of water levels in Conservation Area 2A was delayed as a result of legal actions taken in state courts. As a result, the District did not actually begin the "draw down" until August, 1980.

Florida Laws (4) 120.52120.54120.56120.57
# 3
MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS vs. PAL-MAR WATER MANAGEMENT DISTRICT & SOUTH FLORIDA WATER, 77-001616 (1977)
Division of Administrative Hearings, Florida Number: 77-001616 Latest Update: Apr. 17, 1978

Findings Of Fact Pal-Mar is a water management district operating pursuant to Chapter 298, Florida Statutes, in Martin and Palm Beach Counties, Florida. Pal-Mar has proposed to construct a drainage system serving approximately 22,500 acres of land of which approximately 18,000 acres are located in Martin County. There are five (5) proposed phases of construction required to complete the drainage system. Four (4) of these phases, I, II, IV and V, are considered by Pal-Mar to constitute a closed system as defined in Section 373.403(6), Florida Statutes. There is no connection between phase III and the rest of the system. During mid 1976, Pal-Mar filed an application with SFWMD for a surface water management permit for Pal-Mar's water management plan for phase III. It was stated therein that Pal-Mar considered phases I, II, IV and V to be a closed system and exempt from the permitting requirement of Part IV, Chapter 373, Florida Statutes. At its regular monthly meeting of October 7, 1976, the governing board of SFWMD considered the status of phases I, II, IV and V of the Pal-Mar plan. A motion to declare phases I, II, IV and V not a closed system failed. No other motion was made concerning the system. At its annual landowners meeting of June 16, 1977, the president of Pal-Mar's Board of Supervisors indicated that Pal-Mar had received a "tentative declaration" that phases I, II, IV and V constitute a closed system. On September 2, 1977, Martin County initiated the instant proceeding. Phases I, II and V of the propose drainage system are separated from phase IV by State Road 711. The section of State Road 711 in Martin County is maintained by Martin County and Martin County owns a 200 foot easement for the State road. The southern portion of State Road 711 within the drainage system runs through Palm Beach County. The Jupiter Grade Road passes through the center of the proposed drainage system's reservoir in an east/west direction. Litigation is presently pending between Pal-Mar and Martin County as to the ownership of the Jupiter Grade Road. Pal-Mar has acquired no easements or other legal use of the Jupiter Grade Road from Martin County nor has Pal-Mar obtained from Martin County any form of easement or license to cross State Road 711 for purposes of implementing the drainage system. As part of its plan, Pal-Mar intends to acquire from either Martin County or Palm Beach County such control of or access to State Roads 711 and its appurtenant easement as is necessary to implement the drainage system plan. As to the Jupiter Grade, Pal-Mar intends to either provide a two part reservoir with containment levees to protect the Jupiter Grade, to seek requisite ownership or control of the Jupiter Grade from Martin County or to voluntarily relocate the Jupiter Grade as part of its proposed project. Finally, the project will require a joint levee east of phase IV, 500 feet north of State Road 706. Pal-Mar intends as part of its plan to obtain necessary easements for construction of the joint levee. The proposed system requires no water for filling, replenishing and maintaining its water level and indeed requires no water at all.

Recommendation For the foregoing reasons, it is recommended that South Florida Water Management District enter its declaratory statement declaring that the Pal-Mar Water Management District plan is a closed system as that term is defined in Section 373.403(6), Florida Statutes. DONE and ENTERED this 8th day of March, 1978, in Tallahassee, Florida. MICHAEL R. N. McDONNELL Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of March, 1978.

Florida Laws (1) 373.403
# 5
JAMES SARTORI, D/B/A WILLOWBROOK FARMS vs. ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 81-002393RX (1981)
Division of Administrative Hearings, Florida Number: 81-002393RX Latest Update: Nov. 24, 1981

Findings Of Fact On December 31, 1976, Respondent's territorial jurisdiction was expanded by transfer of substantial areas formerly regulated by other water management districts. The transfer was effected pursuant to legislative revision of Section 373.069, F.S., which delineates the geographic boundaries of Florida's water management districts. The following rule promulgated by Respondent became effective on January 31, 1977, and was amended on February 3, 1981: 40C-4.031 (previously 16I-4.04, Florida Administrative Code). Implementation. These regulations shall become effective February 1, 1981, throughout the District and will be implemented in those areas transferred to the St. Johns River Water Management District from the Central & Southern Florida Flood Control District and the Southwest Florida Water Management District on the same date. Implementation in other areas will be effected pursuant to public hearing at subsequent dates determined by the Board. The regulations implemented by the above rule establish permitting procedures for projects which involve holding, diversion, or discharge of significant quantities of water. However, permits are required only in the transferred territory. Petitioner owns 11,500 acres located within the territory where permits are required. Petitioner seeks to improve his property for agricultural purposes, which involves the holding and diversion of surface waters. He has accepted Respondent's determination that his property is within the permitting area and has filed the requisite application. However, Petitioner contends that he is unable reasonably to confirm Respondent's determination that his property is situated in the regulated territory. Respondent demonstrated that a determination can be made by comparing the statutory descriptions of Respondent's jurisdiction prior to and after the transfer, and has maps available which reflect the permitting area. To accomplish this task independently requires knowledge of legal territorial descriptions (section, township, range) and a laborious comparison of legal descriptions set out in the 1975 and 1977 versions of the Florida Statutes. At the time reorganization of the water management districts became effective (December 31, 1976) , Respondent had limited regulatory capability. Its decision to implement permitting only in the transferred territory was based on this limited capability and the need to preserve continuity 1/ in areas where permits had previously been required. In the years following this decision, Respondent has continued to require permits only in those areas transferred in 1976. The evidence established that the boundary between the regulated and unregulated areas is one of convenience and has no hydrological or other scientific basis. Respondent is considering a revision of its rules to become effective sometime in 1982. This revision may enlarge the permitting territory and modify the criteria for grant or denial of permits. Petitioner asserts that his application is being evaluated by rules not yet adopted and fears that new standards may be applied after hearing on the application, which is now under consideration pursuant to Subsection 120.57(1), F.S., (DOAH Case No. 81-1588). Hearing is scheduled for December, 1981. In support of this contention, Petitioner points to the technical staff report prepared in May, 1981, which recommends denial of the application giving, among others, the following reasons: Volumes 1 and 2 of Phase 1 of the Upper Basin Plan catalogue a history of a diminish- ing water resource in the upper basin. The water resources in the upper basin have been harmed and the proposed project aggravates the existing harm to the resource. Moreover the proposed project is inconsistent with the overall objectives of the district for the upper basin. Resolutions 75-11 and 81-2, the 1977 Management Plan, and Volumes 1 and 2 of Phase I of the Upper Basin Plan indicate that the objectives of the District are to curtail inter-basin diversion and maintain and enhance, if possible, the existing hydro- logic regime in the upper basin. The pro- posed project is not in conformance with either of these statutory requirements. (Emphasis added.) An earlier technical staff report prepared in November, 1980, recommended grant of the application, with some modification. This report did not refer to inter-basin diversion.

Florida Laws (7) 120.52120.54120.56120.57373.069373.113373.413 Florida Administrative Code (2) 40C-4.03140C-4.301
# 6
TRUMP PLAZA OF THE PALM BEACHES CONDOMINIUM ASSOCIATION, INC. vs PALM BEACH COUNTY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 08-004752 (2008)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 23, 2008 Number: 08-004752 Latest Update: Nov. 09, 2009

The Issue The issue is whether an Environmental Resource Permit (ERP) and a Letter of Consent to Use Sovereignty Submerged Lands (Letter of Consent) should be issued to Respondent, Palm Beach County (County), authorizing it to fill 7.97 acres of submerged lands for a restoration project in Lake Worth Lagoon.

Findings Of Fact Based upon all of the evidence, the following findings are determined: The Parties Trump is the owner association for a two-towered residential and commercial condominium building located at 525 South Flagler Drive in downtown West Palm Beach, upland and west of the project site in the Lagoon. Each tower rises thirty floors and together they have of two hundred twenty units. The first five floors are common areas including a lobby on the first floor, while a pool and patio are located on the fifth floor of the north tower. The property is separated from the Lagoon by Flagler Drive, a four-lane divided road with landscaping and sidewalks which runs adjacent to, and on the western side of, the Lagoon. There is no dispute that Trump has standing to initiate this action. Flagler owns, manages, and leases two multi-story office buildings located at 501 Flagler Drive on the upland real property directly west of the project location. Like the Trump property, the Flagler property is separated from the Lagoon by Flagler Drive. There is no dispute that Flagler has standing to participate in this matter. The County is a political subdivision of the State and is the applicant in this proceeding. The Department is the state agency with the authority under Part IV, Chapter 373, Florida Statutes,2 to issue to the County an ERP for the project, as well as authority as staff to the Board of Trustees of the Internal Improvement Trust Fund (Board of Trustees) to authorize activities on sovereign submerged lands pursuant to Chapter 253, Florida Statutes, and Chapter 18-21. Background On October 29, 2007, the County submitted to the Department its Joint Application for an ERP and Letter of Consent to use sovereignty submerged lands in the Lagoon owned by the Board of Trustees. The application was assigned File No. 50- 0283929-00. After an extensive review process, including three requests for additional information, on August 12, 2008, the Department issued its Notice of Intent authorizing the County to fill 7.97 acres of submerged lands in the Lagoon with approximately 172,931 cubic yards of sand and rock material to create the following: (a) approximately 1.75 acres of red mangrove habitat including 1.52 acres of mangrove islands and 0.23 acres of red mangrove planters; (b) approximately 0.22 acres of cordgrass habitat; (c) approximately 0.90 acres of oyster habitat; (d) approximately 3.44 acres of submerged aquatic vegetation habitat; and (e) a 10-foot by 556-foot (5,560 square feet) public boardwalk with two 3-foot by 16-foot (48 square feet) educational kiosk areas and a 16-foot by 16-foot (256 square feet) observation deck for a total square footage of approximately 5,912 square feet. The Notice of Intent also included a number of general and specific conditions particular to this project. Trump (by timely Petition) and Flagler (by intervention) then challenged the Notice of Intent. They contend generally that the project unreasonably infringes upon or restricts their riparian rights and fails to meet the permitting and consent to use criteria set forth in Chapters 18-21 and 40E-4, as well as Chapter 373, Florida Statutes, and Section 253.141, Florida Statutes. Conflicting evidence on these issues was presented at the hearing. The conflicts have been resolved in favor of the County and the Department, who presented the more persuasive evidence. The Project The project area is a cove in the Lagoon, a Class III water body which extends within the County from North Palm Beach to Manalapan. The western side of the water body in the project area is lined with a vertical concrete seawall approximately 6.64 feet above the mean low water line. The waters immediately adjacent to the Trump and Flagler upland property are generally two to five feet deep along the seawall. To the east lies the island of Palm Beach, to the south is the Royal Park Bridge, which connects West Palm Beach and the Town of Palm Beach, while to the north is the Flagler Memorial drawbridge. The Lagoon is approximately 2,000 feet from shore to shore. The Intracoastal Waterway (ICW) runs roughly through the middle of the Lagoon in a north-south direction. Currently, there is an artificial dredge hole in the project area around four hundred feet from the western seawall. The dredge hole, which descends to approximately twenty feet at its deepest location, is filled with muck, which can be re- suspended by wave energy into the water, blocking the sunlight necessary for the support of biotic life. The muck covers the natural hard bottom, consumes oxygen, and presents an unsuitable environment for benthic organisms. The dredge hole is too deep to support seagrasses. The project calls for filling the dredge hole to intertidal elevations, i.e., between the high and low tide elevations, for mangroves and elevations suitable for seagrass. In all, approximately 173,000 cubic yards of fill will be placed in and around the hole to build up three separate islands within the project footprint, on which the County will plant 10,000 red mangroves, which naturally grow between fifteen and twenty-five feet in height. (The County estimates that eighty to ninety percent of the mangroves will survive and grow to a height of at least fifteen feet.) The top of the islands, not including mangroves, will be just below the mean high water mark. The County also proposes locating planters along the seawall and oyster reefs along the southern end of the project. The planters are designed to extend out approximately twenty feet from the seawall and will be placed on sovereign submerged lands. The last five feet will consist of limestone rock. Mangrove, spartina, and seagrass habitats will provide a biodiverse source of food and habitat for other species, and occurs naturally within the Lagoon but has been lost over time. Oyster habitat is proposed for additional bio-diversity and to provide a natural water filtration function. From the County's perspective, the restoration project would be incomplete without all the habitats proposed. The planters will be at an intertidal elevation, planted with red mangroves and spartina, and faced with rock to reduce wave energy in the area. The oyster reefs are rock structures designed to rise one foot above mean high water line for visibility to boaters. The project also includes a boardwalk and attached educational kiosks on the south side of the project to bring the public in contact with the habitats. The County will maintain the boardwalk, empty the trash daily, and open/close the gates at sunrise/sunset. The County proposes a minimum ten-foot buffer between seagrass beds and the fill area. The project is part of the County's Lagoon Management Plan, which outlines the County's restoration goals within the Lagoon. The County has performed numerous other restoration projects within the Lagoon to re-introduce mangrove and seagrass habitat, such as Snook Island, which consisted of filling a 100- acre dredge hole, installing mangrove islands, seagrass flats, and oyster reefs. The Snook Island project restored mangrove habitat and recruited fish and bird species, including endangered and threatened species. Snook Island has remained stable, with no sediment deposition or erosion. The County intends to fill the dredge hole with native lagoon bottom sediment. A clam-shell machine will deposit the sediment below the water line to reduce turbidity. Sediment will be placed around the edges of the dredge hole, reducing the velocity of the fill as it settles to the bottom and encapsulates the muck, as required by Draft Permit Special Condition No. 19. The County will use turbidity curtains, monitor conditions hourly, and stop work if turbidity levels rise beyond acceptable standards. These precautions are included in Draft Permit Conditions 12, 13, and 14. The County will use construction barges with a four- foot draft to avoid propeller dredge or rutting and will place buoys along the project boundary to guide the construction barges, precautions integrated into the Draft Permit conditions. The County's vendor contracts require maintenance of construction equipment to prevent leakage. A similar condition is found in the Draft Permit. Both the intertidal and seagrass flats elevations at the top of the islands will be built at a 4:1 slope; elevations subject to wind and wave energy will be reinforced with a rock revetment constructed of filter cloth and rock boulders. Seagrass elevations will have no reinforcing rock because they are deep enough to avoid significant currents. Proposed drawings were signed and sealed by a professional engineer. The ERP Criteria To secure regulatory approval for an ERP, an applicant must satisfy the conditions in current Rules 40E-4.301 and 40E- 4.302. The first rule focuses primarily on water quantity, environmental impacts, and water quality. The latter rule requires that a public interest balancing test be made, and that cumulative impacts, if any, be considered. Also, the BOR, which implements the rule criteria, must be taken into account. a. Rule 40E-4.301 21. Paragraphs (1)(a), (1)(b), (1)(c), (1)(g), (1)(h), and (1)(k) and subsections (2) and (3) of the rule do not apply. Although Trump and Flagler have focused primarily on paragraphs (1)(d), (f), and (i) in their joint Proposed Recommended Order, all remaining criteria will be addressed. Paragraph (1)(d) requires that an applicant give reasonable assurance that the proposed activity "will not adversely affect the value of the functions provided to fish and wildlife and listed species by wetlands and other surface waters." Based on the project design, the filling of the dredge hole and capping of muck, the restoration of seagrass habitat, and the creation of mangrove habitat, the project will have no adverse impacts but rather will be beneficial to the value of functions for fish and wildlife. Paragraph (1)(e) requires that an applicant give reasonable assurance that the proposed activity will not adversely affect the quality of receiving waters. The County will be required to manage turbidity that may be generated from the project. In part, the turbidity will be contained by the proposed construction method for filling the dredge hole. As noted earlier, the native sand will be deposited using a clamshell-type arm to dump the sand under the water around the periphery of the edge of the downward slope of the dredge hole. This will continue around the periphery of the hole, building up a lip and letting it slide down towards the bottom of the hole, squeezing the muck into the center of the hole and beginning to encapsulate it. Once there are several feet of native sand over the muck to encapsulate it, the County will resume the filling at the target rate. Subsection 4.2.4.1 of the BOR requires that the County address stabilizing newly created slopes of surfaces. To satisfy this requirement, the County will place the fill at a 4:1 slope. The outer edge of the mangrove islands slope back to a 4:1 slope and use rock rip-rap to stabilize that slope. Also, filter cloth, bedding stones, and boulders will be used. Because water currents slow near the bottom, the 4:1 slope for the seagrass elevations on the bottom will not de-stabilize. There will be turbidity curtains around the project area. Those are floating tops and weighted bottoms that reach to the bottom and are intended to contain any turbidity that may be generated by the project. Specific Conditions 12, 13, and 14 require extensive monitoring of turbidity. The County proposes to use a barge with a draft no greater than four feet. This aspect of the project will require a pre-construction meeting and extensive monitoring throughout the project. As a part of the application review, the County performed a hydrographic analysis which was coordinated with and reviewed by the Department staff. There are no expected debris or siltation concerns as a result of the project. The more persuasive evidence supports a finding that over the long term, the project is expected to have a beneficial effect on water quality. By filling the dredge hole and providing habitat for seagrass, mangroves, and oysters, the project will provide net improvement to water quality. The requirements of the rule have been met. Paragraph (1)(f) requires that the applicant provide reasonable assurance that the activities will not "cause secondary impacts to the water resources." More detailed criteria for consideration are found in BOR Subsection 4.2.7. The County has provided reasonable assurance that through best management practices, it will control turbidity. Also, Specific Conditions in the proposed permit require that water quality monitoring be conducted throughout the process. There will be no impacts to upland habitat for aquatic or wetland dependent species. This is because a vertical seawall is located upland of the project site, and no surrounding uplands are available for nesting or denning by aquatic or wetland dependent listed species. A secondary impact evaluation also includes an evaluation of any related activities that might impact historical and archaeological resources. There are, however, no historical or archaeological resources in the area. If resources are uncovered during the project, Draft Permit conditions require notification to the Department of State. Finally, there are no anticipated future activities or future phases on the project to be considered. Rule 40E-4.301(1)(i) requires that the applicant provide reasonable assurance that the project "will be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed." Trump and Flagler contend that the project cannot be constructed and successfully operated as proposed. Trump's expert witness, Joseph Pike, testified that there were ambiguities and conflicts within the plan drawings that would require changes upon build-out; either fill will be placed outside of the fill area, or the mangrove islands will be smaller than depicted. Mr. Pike also voiced concerns that a 4:1 slope would not be stable and might cause fill to migrate to existing seagrass beds. He further stated that the Snook Island project included 18:1 slopes, and he thought providing rock revetment only at the intertidal zone was insufficient. Mr. Pike acknowledged that he had used 4:1 slopes in lake projects; however, in a tidal project involving fill placement, he opined that a 4:1 slope was likely to "relax." He did not do calculations about what slope might hold and admitted that prior experience using similar slopes with the same type of fill might change his opinion. Finally, Mr. Pike noted that a portion of the dredge hole would not be filled and concluded that the project would not fully cap the muck. Trump's biologist, James Goldasitch, speculated that the water flow changes would cause sediment deposition on existing seagrass beds, possibly causing the seagrasses to die. He admitted, however, that the County's plans called for the creation of 3.44 acres of seagrass and did not know the amount of habitat created compared to the amount of habitat he anticipated being affected. The Department's engineer, Jack Wu, approved the hydrologic aspects of the County's plan, but Mr. Goldasitch speculated that Mr. Wu was more focused on shoreline stability than on depositional forces. Mr. Goldasitch never actually spoke to Mr. Wu regarding his analysis, and Mr. Wu's memorandum refers not only to engineering and construction aspects of the proposal but also to the criteria in Rules 40E-4.301 and 40E-4.302. Mr. Goldasitch believed the County's boardwalk will impact the seagrass beds by blocking sunlight, but acknowledged that the Draft Permit required the boardwalk to be elevated and portions to be grated. Both the Florida Fish and Wildlife Conservation Commission and the Department's expert witness concluded that the permit conditions for constructing the boardwalk, which are common, eliminated impacts to seagrass. Mr. Goldasitch further opined that the 4:1 slope might slump, but then deferred to the opinion of a registered engineer on this type of engineering matter. The County presented its professional engineer, Clint Thomas, who worked on the project design. Mr. Thomas explained that permit drawings are not intended to be construction-level in detail, but are merely intended to provide sufficient detail for the regulator to understand the project within the 8 and 1/2 by 11-inch paper format required by the Department. The County will ultimately prepare permit-level, construction-level, and as-built drawings. Permit conditions also require a pre-construction meeting. No fill will be placed outside the area designated for fill, and the 4:1 slope will start at the outer boundary of the designated fill area until it reaches the specified elevation. Mr. Thomas acknowledged that the plan view drawings depict a mangrove island too close to the western project boundary, but stated that the mangrove island would simply be placed farther to the east during the construction-level plan process. Islands will become smaller islands, but will not be relocated, and in no event will the fill area expand; the fill boundary is a very strict limit. There is no evidence that the County has ever violated a fill boundary established in a permit. The 4:1 slope was based on the type of fill proposed for the project and to maximize project features. Mr. Thomas has successfully used 4:1 slopes with non-compacted fill in the Lagoon, both at Snook Island in its as-built state and at other projects. The islands at Snook Island are similar to those proposed. Other areas in the Lagoon have held slopes steeper than 4:1 with the same type of fill. Therefore, Mr. Thomas opined the 4:1 slope would hold. In rendering this opinion, he explained that the currents in the project vicinity are only around 1.2 knots. Because currents slow near the bottom, the 4:1 slope for the seagrass elevations on the bottom will not de- stabilize. Mr. Thomas addressed the contention that a change in water flow velocity would cause sediment to deposit on existing seagrass. The oyster reefs are rubble structures that allow the water to flow through. If any sediment flows through, it will deposit on the north side of the oyster bar, rather than on the seagrass beds. Given these considerations, the evidence supports a finding that the project will function as proposed. Finally, paragraph (1)(j) requires that the County provide reasonable assurance that it has the financial, legal, and administrative capability to ensure that the activity will be undertaken in accordance with the terms and conditions of the permit. The evidence supports a finding that the County has complied with this requirement. In summary, the evidence supports a finding that the County has given reasonable assurance that the project satisfies the criteria in Rule 40E-4.301. b. Rule 40E-4.302 In addition to the conditions of Rule 40E-4.301, the County must provide reasonable assurance that the construction of the proposed project will not be contrary to the public interest. See Fla. Admin. Code R. 40E-4.302(1)(a)1.-7. Rule 40E-4.302(1)(a)1. requires that the Department consider whether the activity will adversely affect the public health, safety, or welfare or the property of others. Trump first contends that the project will increase the mosquito population. The evidence shows, however, that the mangroves will be placed below the mean high water mark and therefore no increase in mosquitoes should occur. Also, the design of the project, coupled with the local mosquito control program, should ensure that there will be no increase in mosquito population or a risk to the public health. Trump also raised the issue of an increase in trash along the boardwalk area or in the newly-created mangrove islands. The County presented evidence that there will be appropriate trash receptacles in the area as well as regular garbage collection. In terms of safety, navigation markers are included as a part of the project for safe boating by the public. The County consulted with the United States Coast Guard regarding navigation issues. Further, the project will not cause flooding on the property of others or cause an environmental impact on other property. Although a number of Trump residents expressed sincere and well-intended concerns about the project impacting the value of their condominiums (mainly due to a loss of view), BOR Subsection 4.2.3.1(d) provides that the "[Department] will not consider impacts to property values or taxes." Rule 40E-4.302(1)(a)2. requires that the Department consider whether the activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats. Subparagraph 4. of the same rule requires that the Department consider whether the activity will adversely affect the fishing or recreational value or marine productivity in the vicinity of the activity. The proposed activity is a restoration project for the creation of seagrass and mangrove habitats. As such, it is beneficial to the conservation of fish and wildlife and is expected to increase the biotic life in the project area. Besides providing additional habitat for fish and wildlife, the project will add to the marine productivity in the area. In terms of recreational opportunities, the project is expected to be a destination for boating, kayaking, fishing, and birdwatching. The Florida Fish and Wildlife Conservation Commission has also recommended issuance of the permit with the standard manatee condition for in-water work. This recommendation has been incorporated as Specific Conditions 23 through 25 Rule 40E-4.301(1)(a)3. requires that the Department consider whether the activity will adversely affect navigation and the flow of water, or cause harmful erosion or shoaling. The nearest navigation channel is the ICW. The project is located outside of that area. Subsection 4.2.3.3 of the BOR provides additional guidance on the evaluation of impacts of this nature. Paragraph (a) of that subsection provides that, in evaluating a proposed activity, the Department "will consider the current navigational uses of the surface waters and will not speculate on uses which may occur in the future." Trump residents indicated that in the project area persons are now picked up off the seawall and then travel to the ICW. Access to the seawall is possible from the east and south, although existing shoals currently limit the approach from the south. Large boats do not use the area because of shoals. In general, "[t]here's not a whole lot of boating activity in the project area." The parties agree that if the project is constructed as designed, boats will not be able to travel directly out from the seawall in front on Trump or Flagler to the ICW, as they now do. However, navigation in the area will still be available, although not as convenient as before. As to water flow, shoaling, and erosion, the more persuasive evidence supports a finding that the 4:1 slope will be stable and will not cause fill to migrate outside of the boundaries of the project into existing seagrass beds. The tidal flow will continue through the area after construction without sediment deposition into existing seagrass beds or destabilizing the 4:1 slope. There will be no shoaling or erosion. Finally, the project will be permanent and there are no significant historical and archaeological resources in the area. See Fla. Admin. Code R. 40E-4.302(1)(a)5. and 6. In summary, the evidence supports a finding that the County's proposal is neutral as to whether the activity will adversely affect the public health, safety, welfare, or the property of others; that the County's proposal is neutral with respect to navigation, erosion and shoaling, and water flow, as well as to historical and archaeological concerns; and that the County's proposal is positive with respect to the conservation of fish and wildlife, recreational values and marine productivity, permanency, and current values and functions. When these factors are weighed and balanced, the project is not contrary to the public interest and qualifies for an ERP. D. Proprietary Authorization Chapter 18-21 applies to requests for authorization to use sovereign submerged lands. The management policies, standards, and criteria used to determine whether to approve or deny a request are found in Rule 18-21.004. In making its review, the Department reviews the rule in its entirety; it also looks at the forms of authorization (e.g., letters of consent, leases, deeds, or easement) to determine the most appropriate form of authorization for an activity. Trump and Flagler have raised contentions regarding the proprietary authorization, including whether the application should have been treated as one of heightened public concern, whether the proper form of authorization has been used, and whether their riparian rights are unreasonably infringed upon by the project. Heightened Public Concern Rule 18-21.0051 provides for the delegation of review and decision-making authority to the Department for the use of sovereign submerged lands, with the following exception found in subsection (4) of the rule: (4) The delegations set forth in subsection (2) are not applicable to a specific application for a request to use sovereign submerged lands under Chapter 253 or 258, F.S., where one or more members of the Board, the Department, or the appropriate water management district determines that such application is reasonably expected to result in a heightened public concern, because of its potential effect on the environment, natural resources, or controversial nature or location. On March 13, 2008, the Department's West Palm Beach District Office sent a "heightened public concern [HPC]) memo" to the Department's review panel in Tallahassee,3 seeking guidance as to whether the project required review by the Board of Trustees under the above-cited rule. The Department emailed the County on March 14, 2008, stating that the project would be elevated to the Board of Trustees for review to approve the entire Lagoon Management Plan. The County asked for reconsideration, concerned over timing restraints on grant opportunities. This concern is based on the fact that the County will receive grant monies to assist in the construction of the project and must have regulatory approval by a date certain in order to secure those funds. A second HPC memorandum was sent to the review panel on April 22, 2008. Part of the interim decision to elevate the application to the Board of Trustees concerned the boardwalk connection to the City of West Palm Beach's existing seawall. The City of West Palm Beach is the upland owner of the seawall, sidewalk, and Flagler Drive. On June 9, 2008, the Mayor of West Palm Beach sent a letter to the Department stating that the City "fully supports" the proposed activity, and that the County and the City collaborated on the design of the project, held joint public meetings, and produced a project video. See Department Exhibit Trump and Flagler argue that under the City Charter, the Mayor cannot unilaterally bind the local government to allow structures to be built on City property. Assuming this is true, one of the remaining conditions for the County to initiate the project is to obtain a "letter of concurrence" from the City of West Palm Beach authorizing the County to connect the boardwalk to the seawall. Therefore, the review panel ultimately concluded that the application could be reviewed at the staff level and did not require Board of Trustees review. The evidence at hearing did not establish that the application was one of heightened public concern, given the limited size of the project, its location, and the net benefit to both environmental and natural resources. Compare Brown, et al. v. South Fla. Water Mgmt. Dist., et al., DOAH Case No. 04-0476, 2004 Fla. ENV LEXIS 112 (DOAH Aug. 2, 2004, SFWMD Sept. 8, 2004). Therefore, review by the Board of Trustees was not required. Form of Authorization Trump and Flagler contend that an easement is required by the County, rather than a consent of use. The standard for obtaining an easement is more stringent than a consent of use, and an easement offers a greater interest in sovereign lands. Rule 18-21.005(1) provides the general policy direction for determining the appropriate form of authorization and reads in relevant part as follows: It is the intent of the Board that the form of authorization shall grant the least amount of interest in the sovereignty submerged lands necessary for the activity. For activities not specifically listed, the Board will consider the extent of interest needed and the nature of the proposed activity to determine which form of authorization is appropriate. This rule requires that the Department should apply the lowest and least restrictive form of authorization. Trump and Flagler argue that the County's project constitutes a spoil disposal site under Rule 18-21.005(1)(f)8., a public water management project other than public channels under Rule 18-21.005(1)(f)10., or a management activity which includes "permanent preemption by structures or exclusion of the general public," as described in Rule 18-21.005(1)(f)11. Each of these activities requires an easement rather than a letter of consent in order to use sovereign submerged lands. The evidence shows that the County's project is not a spoil disposal site. Also, it is not primarily a public water management project as there is no evidence that the project relates in any way to flood control, water storage or supply, or conservation of water. Likewise, there is no evidence indicating that the activities will prevent access by the public by exclusion. Even though many of the features (structures) of the project will be permanent, the project is intended to generally increase public access to water resources, as well as the islands, boardwalk, and kiosks. Besides raising the issue of heightened public concern, the second HPC Memorandum dated April 22, 2008, sought guidance as to whether the project required a consent of use or an easement. The review panel concluded that the project qualified for a consent of use, rather than an easement under Rule 18- 21.005(1)(f), because the County's project most closely fits the definition in Rule 18-21.005(1)(c)15. That rule provides that if the proposed activity involves "[h]abitat restoration, enhancement, or permitted mitigation activities without permanent preemption by structures or exclusion of the general public," an applicant may use sovereign submerged lands with a consent of use. Because the County's project increases public access not only to water resources in the Lagoon but also to the permanent structures being built, it more closely falls within the type of activity described in Rule 18-21.005(1)(c)15. Notably, all of the County's restoration projects in the Lagoon have been previously authorized through a consent of use. Finally, the review panel concluded that the project did not fall under Rule 18-21.005(1)(f)16., which requires an easement for environmental management activities that include "permanent preemption by structures or exclusion of the general public" because of the rule's focus on the exclusion of the general public. Riparian Rights The parties have stipulated, for the purpose of this proceeding, that Trump and Flagler have riparian rights, including view, ingress/egress, fishing, boating, swimming, and the qualified right to apply for a dock, that should be considered. Trump and Flagler contend that their right to wharf out (build a dock) from the seawall, ingress/egress from navigable water, and view will be unreasonably infringed upon if the application is approved. See Fla. Admin. Code R. 18- 21.004(3)(a)("[n]one of the provisions of this rule shall be implemented in a manner that would unreasonably infringe upon the traditional, common law riparian rights, as defined in Section 253.141, F.S., of upland property owners adjacent to sovereignty submerged lands"). For the reasons given below, the greater weight of evidence establishes that none of these riparian rights will be unreasonably infringed upon. Currently, while access is possible from the east and the southern approaches, existing shoals limit the southern approach. The boardwalk will further limit boat traffic on the south end, and boats would not be able to cross over the islands. Boat traffic will still be able to access the cove from the north end, and the restoration project will create a boating destination. Trump witness Pike opined that the County's project would negatively affect navigation between the upland parcels and the ICW because the project would eliminate the eastern and southern approaches and leave only the northern approach, which could not be used by both parcels fully. The County's expert, Dr. Nicholas De Gennarro, testified that, during his site visits, he observed boat traffic waiting for the drawbridges using the east side of the ICW away from the project site. Dr. De Gennarro noted that several existing structures are closer to the ICW than the proposed County project, which lies 220 feet away from the ICW. Thus, Dr. De Gennarro concluded that the project would not impact navigation in the ICW. With respect to ingress/egress, Dr. De Gennarro acknowledged that access to the Trump and Flagler properties would not be available from the southern and eastern approaches, but concluded that the restriction represented nothing more than an inconvenience. He noted that the southern approach was already a less preferable approach due to existing shoals. At present, there is very little boating in the area outside of special events. While the project would limit the use of boats directly over the one and one-half acres of mangrove islands, the project will provide a boating destination. Further, both the City docks to the north of the site and the temporary docks in front of Flagler's property –- both used for special events –- will still be available under the County's proposal. There is no swimming and very little fishing in the area because of the degraded conditions caused by the dredge hole. Accordingly, while the project will fill a small portion of water currently available, but not used, for swimming, it will greatly enhance swimming by providing a destination for swimmers. The mangroves planned for the intertidal islands are likely to reach a height of fifteen feet and will be interspersed with spartina. The seawall is located six feet above the water line, making a person's view at eye level already several feet above the water. Trump and Flagler's buildings are built at even higher elevations. Therefore, the mangroves will not substantially obscure the view from either property, even at street level where the view is already partially obscured by existing landscaping. The Lagoon is approximately 2,000 feet across. From north to south around one hundred acres of water can now be viewed from the vicinity. Since the intertidal islands only comprise one and one-half acres, the overall impact to the view of the water body is very small. The mangroves in the planters extending out from the seawall will be trimmed to one foot above the seawall; the County requested the condition and committed at hearing to trimming the mangroves if the City of West Palm Beach does not. County photographs show Trump and Flagler's present view of the water body and demonstrate the comparatively small percentage of the view affected by the one and one-half acres of mangrove islands. See County Exhibits 133a-e and 134a-d. The photographs also demonstrated that sizeable palm trees are already part of the existing view. Additionally, the County photographs depicted the small impact that trimmed mangrove planters would have on the view. The area obstructed by the mangrove islands and seagrass is negligible compared to the expanse of the existing view. Trump and Flagler offered no evidence to contradict the County's analysis regarding the scope of the impact on the view. Trump residents Dale McNulty, Dean Goodman, and Charles Lemoine testified that they personally would not want to view mangrove islands regardless of tree size or the size of the islands. Understandably, after years of unfettered view and an open expanse of water, they are opposed to any type of project in this area of the Lagoon. However, Mr. Goodman acknowledged that he would still be able to see the Town of Palm Beach from his unit. The evidence supports a finding that while the project will undoubtedly alter the view of the water from both Trump and Flagler's property, the impact on view is not so significant as to constitute an unreasonable infringement of their riparian rights. Mr. Lemoine stated that he had a forty-foot trawler that he would like to dock in front of his property. He currently docks the boat at a marina twenty miles north of the Trump property. He prefers to bring his boat in stern first and enter slips oriented north to south. He indicated that he can drive his boat in five feet of water, but prefers six feet; however, he also testified that he has brought his boat directly up to the bulkhead in front of Trump, which is approximately a two- or three-foot depth. The witness has seen sailboats and other boats moored near the bulkhead over extended timeframes. Mr. Lemoine speculated that Trump might seek a dock, either alone or in conjunction with Flagler, but admitted that Trump has never applied for a dock permit. He stated that Trump has had discussions about the possibility of a dock over the last fifteen years and speculated that a dock plan might include anything from the purchase/lease of the City docks to a lease of Trump's riparian interests to a third party. By contrast, Trump resident and former Board member Dean Goodman indicated "the idea was to provide an amenity [for] a number of people that are in the building that are boaters." Mr. Goodman stated that he hoped to be able to have a boat in front of the building someday, but did not own a boat in Florida. Association president Dale McNulty explained that, while informal discussions have occurred regarding the possibility of a dock, no official action had been taken. Mr. McNulty characterized the dock plans as being "sort of in the land of wishful thinking." Mr. Pike, while acknowledging that both parcels would still be able to design a dock for their property, opined that the County's project unreasonably limited the size and configuration of the docks possible. Mr. Pike initially admitted that a safe navigation depth for a forty-foot boat, or even a sailboat, was four feet below mean low water (MLW), but stated that he would prefer to design a dock with an additional two-to- three feet of water below the four-foot draft to avoid propeller damage. However, Mr. Pike conceded that he has designed docks for boats in four feet below MLW and ultimately based his own calculations on an assumption of a four-foot draft and one-foot cushion, or five feet below MLW. Mr. Pike also opined that a north-south alignment for boat slips was a preferred slip orientation. Given the bathymetry in the area and the documented seagrasses, Mr. Pike estimated that twenty slips could be designed for the Flagler property, rather than the thirty-four slips provided for by the County Manatee Protection Plan. He thought that a design might accommodate thirty to thirty-two slips for Trump, rather than the forty-slips provided for by the County Manatee Protection Plan. Based on the limitation on number of slips and configurations, the witness opined that the County's project would unreasonably interfere with Trump and Flagler's ability to design a dock. He admitted, though, that the numbers derived from the County Manatee Protection Plan represent a maximum number, rather than a specified or guaranteed number. He further admitted that other agency limitations may further restrict Trump and Flagler's right to dockage. Without a permit application or plan from Trump or Flagler, County witness Robbins concluded that the most reasonable assumption was an owner-oriented facility designed for the building owners/tenants. The County introduced a graphic illustrating areas available for dock construction, with sufficient depth for 35- to 40-foot boats (-6 feet NGVD) and with no seagrasses present. Rule 18-21.004(4)(b)2. limits ownership-oriented facilities generally to forty square feet for each foot of riparian shoreline, giving Trump the ability to apply for a dock that preempted a maximum of 16,000 square feet, and Flagler a maximum of 14,000 square feet. Under the County Manatee Protection Plan, Trump would be limited to forty slips; Flagler would have the potential for thirty-four slips. Mr. Robbins testified that, in his experience, a minus five MLW is a common depth for docks, but that elevations as shallow as a minus four MLW could be used depending on the type of boats and the dock configuration. Mr. Robbins explained that, even with the County's project in place and factoring in the other limitations, Trump would still have 61,842 square feet of potential space within which to design a dock. Flagler would still have 41,481 square feet of potential space, even considering the need to retain a path for ingress and egress from the Trump parcel. A more detailed analysis of the seagrasses might make more square footage available for dock construction. Dr. De Gennarro also evaluated whether a dock could be designed to serve Trump and Flagler's parcels. The vessel owner statistics for the County indicate that at least ninety-five percent of the boats registered in the County are thirty-nine feet or less; consequently, Dr. De Gennarro focused on boats forty feet or less. Dr. De Gennarro considered the water depths and the existence of subaquatic vegetations and concluded that the graphic presented by Mr. Robbins was conservative, but still provided adequate space for both Trump and Flagler to construct appropriate dockage, allowing thirty-eight boats for Trump and thirty-two for Flagler of varying size. However, Dr. De Gennarro concluded that a dock design of forty slips for each would also be possible, depending on the size of the boats. Dr. De Gennarro proposed that a single, double-loaded parallel dock design would be a good layout for a potential docking facility in front of both Trump and Flagler's property that would be protected by the County's proposed islands, provide sufficient water depths, and provide an attractive facility. He specified, however, that the single, double-loaded parallel dock design was simply one of "many" that might work in the given space. Dr. De Gennarro explained that the existing dredge hole would not be a preferable location for either a mooring field or a dock because the deep muck-bottom would drive up the costs for either type of facility. Accordingly, Dr. De Gennarro concluded that the County's project would not foreclose or even substantially restrict the ability to locate a dock in front of Trump and Flagler’s property. The more persuasive evidence supports a finding that neither the right of ingress/egress nor the right to boat in the vicinity is unreasonably infringed upon by the County's project. Trump and Flagler will continue to have reasonable access to navigation. The northerly approach preserved by the County's project will allow for boat traffic to safely navigate in the area. While the southerly and easterly approaches are eliminated by the County's plan, the evidence indicates that the two approaches were less preferable than the northerly approach because of the presence of shoals. Based on the above considerations, the County's project will not unreasonably infringe upon Trump or Flagler's qualified right to a dock. The fact that the project might preclude the design and permitting of a dock that would host very large vessels does not mean that Trump and Flagler's rights regarding docking have been unreasonably infringed. The evidence shows that substantial docking facilities of multiple configurations are still possible even if the County's project is approved. In summary, the County's application for proprietary authorization should be approved. Other Contentions All other contentions raised by Trump and Flagler have been considered and are found to be without merit.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department enter a final order approving the County's application for a consolidated ERP and consent to use sovereignty submerged lands. DONE AND ENTERED this 24th day of September, 2009, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of September, 2009.

Florida Laws (6) 120.52120.569120.57120.68253.1417.64 Florida Administrative Code (5) 18-21.00418-21.00518-21.005140E-4.30140E-4.302
# 7
SEACOAST UTILITY AUTHORITY vs PGA NATIONAL GOLF CLUB AND SPORTS CENTER, LTD., AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 94-002903 (1994)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida May 24, 1994 Number: 94-002903 Latest Update: Apr. 24, 1995

The Issue The issue in this case is whether Seacoast Utility Authority's challenge to the South Florida Water Management District's proposed issuance of a water use permit to PGA National Golf Club and Sports Center, Ltd. in a critical water supply area should be upheld. As discussed below, the parties have stipulated that, in deciding to issue the permit, the South Florida Water Management District has not evaluated or considered whether the use of reclaimed water was either economically, environmentally or technically infeasible.

Findings Of Fact Based upon the evidence adduced at the hearing and the entire record in this proceeding, the following findings of fact are made: Seacoast is a publicly owned water and sewer utility which operates a wastewater treatment facility in Palm Beach County, Florida. Seacoast's service area is bounded on the south by Riviera Beach and on the north by the Town of Jupiter. Seacoast operates four treatment plants: two water plants and two wastewater plants. Seacoast's regional wastewater facility currently generates approximately six (6) million gallons per day ("MGD") of reclaimed water and is permitted by the Florida Department of Environmental Protection ("DEP") as an eight (8) MGD wastewater treatment plant. As discussed in more detail in the Conclusions of Law below, the Florida Legislature and DEP have sought to encourage the reuse of reclaimed water. This policy is one of the many sometimes competing goals that are supposed to be taken into account in the water use permitting process. Until a few years ago, the treated effluent from one of Seacoast's wastewater plants was directly discharged to nearby surfacewater. During the last four years, Seacoast installed a pumping station and five miles worth of transmission lines to deliver all of its treated effluent to its regional wastewater facility. Seacoast claims that these efforts were prompted by its interpretation of changing regulations and a perceived regulatory preference for reuse of water.1 Although Seacoast claims that there has been a change in regulatory emphasis in favor of reuse of reclaimed water, Seacoast is not under a mandate from any court or agency to sell or utilize any specific amount of reclaimed water. It does appear that a deep injection well used by Seacoast for disposal of wastewater is not or was not operating as designed. Seacoast was apparently obligated to construct reclaimed water facilities at its wastewater treatment plant as part of its permit from DEP for the injection well. There was no requirement that the reclaimed water be sold or otherwise utilized. The intended primary disposal for Seacoast's reclaimed water is reuse.2 Seacoast's wastewater treatment plant provides irrigation quality reclaimed water. Seacoast tries to sell the reclaimed water for irrigation use in an effort to recoup the costs incurred in constructing the facilities necessary to reclaim the water. Backup disposal is achieved through injection down a 3300 feet deep injection well into the boulder zone. Once the reclaimed water is injected down the well, it is unavailable for reuse. The evidence suggests that there are other possible utilizations available for Seacoast's reclaimed water including sale to another utility and/or backup recharge to preserve wetlands during periods of high pumpage. For example, Seacoast is apparently in the process of applying for the necessary permits to utilize a portion of its reclaimed water to prevent harm to wetlands adjacent to its Hood Road Well Field by constructing an hydraulic barrier. At all times pertinent to this proceeding, only approximately 1.2 MGD of the reclaimed water generated by Seacoast was being reused. The remaining approximately 5 MGD was disposed of through the injection well. PGA owns and operates three (3) golf courses in Palm Beach County within Seacoast's service area. PGA's golf courses are located within an area that has been designated by the District as a Critical Water Supply Problem Area. Critical Water Supply Problems Areas are geographical regions where the available water supply due to the potential for saltwater intrusion, wetland impacts, or impacts to existing legal uses, is predicted not to meet water demands that are projected during the next 20 years. See, Chapter 40E-23, Florida Administrative Code. The use of reclaimed water is not mandated in such areas. However, the District's Rules seek to insure the optimal utilization of alternative sources of water in such areas to minimize the potential harm to water resources. It is not clear from the evidence presented in this case when PGA first obtained the Permit from the District for golf course irrigation. The Permit allows PGA to use the groundwater table as the source of water for its irrigation. Before its expiration, PGA timely sought renewal of the Permit. On April 12, 1994, the District staff recommended renewal of PGA's Permit. The staff recommendation would allow PGA to continue using the groundwater table as the source of its water. The recommendation did not contain a requirement for PGA to use any reclaimed water as part of its golf course irrigation system. Seacoast became aware of PGA's application to renew its Permit through a routine review of all water use permit applications made to the District by "potential reclaimed water users in [its] service area." Seacoast filed a Petition for Formal Administrative Hearing challenging the District staff's recommendation to renew PGA's Permit. In its Petition, Seacoast alleged that its substantial interests would be affected by the renewal of the Permit because Seacoast's ability to achieve the State of Florida's goals of conservation and environmental protection depends upon PGA, and other similar country clubs, being required to consume reclaimed water. Seacoast contends that the staff recommendation immediately eliminates a major potential consumer of Seacoast's reclaimed water which purportedly impairs Seacoast's ability to meet state objectives for reuse of reclaimed water and results in the undesirable continued disposal of reclaimed water via deep well injection. In connection with its challenge to the proposed renewal of PGA's Permit, Seacoast has stipulated that PGA's proposed withdrawals from the groundwater table would not cause harm to the water resources of the District. Seacoast also admits that it has never evaluated whether it would be environmentally injured by PGA's withdrawals from the groundwater table and/or whether the proposed use by PGA is wasteful. The District does not currently have any goals for the utilization of reclaimed water on a regional basis. Instead, the District oversight of the utilization of reclaimed water is done on a permit by permit basis. As a general policy, the District will not accept a water use permit application in an area of critical water shortage unless a reuse feasibility determination is included. The District's rules do not currently contain any guidelines as to how the determination of feasibility is to be made, nor are there any criteria for reviewing an applicant's determination of feasibility. As discussed below, the District does not even consider the applicant's reuse feasibility determination unless the proposed withdrawal is projected to result in harm to the resources of the District. Even when harm to a resource is projected, the District accepts an applicant's feasibility determination regarding the use of reclaimed water without question or analysis. For the other consumptive use criteria set forth in Rule 40E-2.301, the District independently evaluates the applicant's conclusions to confirm that they are reasonable. In other words, the District treats reclaimed water as an alternative source of water in the event that an applicant's proposed water use is projected to cause harm to the water resources of the District. If no harm is expected to occur to water resources as a result of a proposed use, the District does not review the applicant's determination of whether or not to use reclaimed water. If harm is projected, the applicant is required to look at alternatives like water conservation or utilization of water sources other than those proposed (such as reclaimed water). The applicant is free to select any alternative that mitigates the harm. Thus, even in a Critical Water Supply Area, an applicant can mitigate concerns about harm to the resource without utilizing reclaimed water. In sum, under the District's current procedures, the use of reclaimed water is never required. It is simply one alternative an applicant can utilize to offset or mitigate projected harm to water resources (such as saltwater intrusion, contamination, wetland drawdowns or existing legal use impacts) from a proposed withdrawal. Even when the District staff concludes that an applicant's proposed use will result in harm to water resources, the staff does not critically review the applicant's determination of whether the use of reclaimed water is economically, environmentally, or technically infeasible. With respect to PGA's Permit, the District staff concluded that no harm to the resource was predicted as a result of PGA's proposed use. Thus, PGA's determination not to use reclaimed water was not evaluated or even considered. The District explains that its implementation of the permitting program is based upon its interpretation that its primary responsibility is to prevent harm to water resources. The District points out that there are a number of factors to be considered in utilizing reclaimed water. These factors include, but are not limited to, the cost of the reclaimed water, the cost of retrofitting an irrigation system, the long-term availability of the reclaimed supply and the availability of a back-up supply.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a Final Order dismissing the Petition filed by Seacoast challenging the renewal of Permit Number 50-00617-W to PGA for golf course irrigation. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 6th day of February 1995. J. STEPHEN MENTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of February 1995.

Florida Laws (6) 120.57373.019373.219373.223373.250403.064 Florida Administrative Code (1) 40E-2.301
# 8
PANAGIOTI TSOLKAS, ALFRED LARK, AND CHRISTIAN MINAYA vs THE DAVID MINKIN FLORIDA REALTY TRUST, RICHARD THALL, ROBERT THALL, PETER L. BRIGER, PAUL H. BRIGER, THE LESTER FAMILY INVESTMENTS, LP, PALM BEACH COUNTY, AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 10-003100 (2010)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jun. 04, 2010 Number: 10-003100 Latest Update: Jan. 06, 2011

The Issue The issue is whether to approve an application by Respondents, Palm Beach County (County) and The David Minkin Florida Realty Trust, Richard Thall, Robert Thall, Peter L. Briger, Paul H. Briger, and The Lester Family Investments, LP (The Briger Group), for a conceptual Environmental Resource Permit (ERP) authorizing a surface water management system to serve a mixed-use development in the City of Palm Beach Gardens known as Scripps Florida Phase II/Briger (Scripps project).

Findings Of Fact Based on the evidence presented by the parties, the following findings of fact are made: The Parties Petitioner Tsolkas resides at 822 North C Street, Lake Worth, Florida, which is approximately 16.8 miles (in a straight line) south-southeast of the project site and approximately one mile west of the Intracoastal Waterway (ICW). Among others, he expressed concerns in this case about the potential extinction of species and the impact of the proposed site on the ICW. However, other than a general interest in environmental issues, he presented no evidence to demonstrate how he is affected by the issuance of the permit. Petitioner Minaya resides at 901 North Federal Highway, Apartment A, Lake Worth, Florida, and approximately the same distance from the project site and ICW. He has the same concerns as Petitioner Tsolkas but presented no evidence to demonstrate how the project will affect his substantial interests. The County is a chartered county and a political subdivision of the state. It owns approximately 70.0 acres of the site on which the Scripps project will be located and the 193.92-acre off-site mitigation area for the project at the Pine Glades Natural Area (Pine Glades). It is a co-applicant for an ERP. The Briger Group is a co-applicant for the modified ERP and owns 611.69 acres of the project site. The original permit that is being modified was issued as conceptual approval on January 19, 1978. The District is a public corporation in the State, having been created by special act in 1949 and operating pursuant to Chapter 373, Florida Statutes. The Application On April 27, 2009, the applicants submitted an application to modify a conceptual ERP, Application No. 090427- 7, for a surface water management system to serve 681.89 acres of mixed-use development in the City of Palm Beach Gardens (City). The original permit was also issued as a conceptual approval in 1978 and has been modified conceptually on a number of occasions, most recently in 2001. The application includes 193.92 acres of off-site mitigation at Pine Glades in the northern part of the County and additional off-site mitigation through the purchase of mitigation credits at the Loxahatchee Mitigation Bank in the southern part of the County. "Conceptual approval" means "an [ERP], issued by the District Governing Board, which approves a conceptual master plan for a surface water management system or a mitigation bank." Fla. Admin. Code R. 40E-4.021(5). It constitutes final agency action and is "binding to the extent that adequate data has been made available for review by the applicant during the review process." Id. After conceptual approval is obtained, the applicants must then file an application for an ERP to construct and operate the surface water management system. Therefore, no construction will be authorized by this permit. On April 16, 2010, the District issued a Staff Report recommending approval of the requested ERP. A Revised Staff Report making minor changes and clarifications to the original proposed agency action was issued on May 4, 2010. The Project and the Site The proposed project that will be served by the surface water management system is a multi-use development on a 681-acre tract located south of Donald Ross Road and north of Hood Road in the City. The site is divided by Interstate 95 (I-95) into two wedge-shaped parcels known as the western and eastern parcels. The Florida Turnpike adjoins the western side of the western parcel. With the exception of the highways, the site is surrounded by residential development including two projects located just east of the site: Legends at the Gardens (on the northern side) and San Michele (on the southern side). A portion of the site located east of I-95 is mostly undeveloped and vegetated. However, approximately 60 acres located at the southeast corner of the site include an existing horse farm with improved and unimproved pastures. The central and southern portions of this parcel contain a number of ditches that were created prior to the 1950s. The portion of the site west of I-95 is undeveloped and vegetated, but it also includes a few mobile homes on approximately 2 acres at the southern end of the site. The upland habitats are disturbed and degraded and primarily include pine flatwoods, mixed hardwood-pine forest, hardwood hammock, and dry prairie, some of which are infested with Brazilian pepper, Australian pine, and Japanese climbing fern. There are also around 86 acres of state jurisdictional wetlands and other surface waters. Finally, the southwestern portion of the parcel located west of I-95 contains a prehistoric/archaeological site which is proposed for preservation. The County owns 70 acres of the property on the eastern parcel, while The Briger Group owns the remaining acreage. The project is anticipated to house the Scripps Research Institute, as well as ancillary institutional, commercial, and residential uses. The project received development of regional impact approval from the City on April 1, 2010, and is subject to a master plan that identifies land use districts, such as a biotech district, a town center district, residential districts, and a neighborhood-serving commercial district. The 70 acres owned by the County will be used to house the second phase of the Scripps Research Institute. It is unknown at this time whether the Scripps facility will house administrative offices, laboratory space, or some other use. The build-out schedule for the project is twenty years. Before construction can commence, the applicants will be required to obtain zoning and site plan approval from the City, authorization from both the Northern Palm Beach County Improvement District (Improvement District) and the Seacoast Utility Authority, and a permit from the County Health Department. Also, the applicants will be required to receive a construction-related modification to the ERP from the District. The Surface Water Management System In 2001, the District issued a permit to the Improvement District for conceptual approval of a surface water management system for flood protection within a 4,059.9-acre area known as Unit 2, which includes the area of the proposed project. See Respondents' Exhibit 57. Drainage from the project site is presently covered by this permit. The Improvement District's system was designed, constructed, and is being operated and maintained for stormwater treatment. The waters in that system are not considered waters of the State. The proposed project will discharge into the Improvement District's system, which is upstream of a permitted man-made control structure on the property designed to retain or detain stormwater runoff in order to provide treatment and attenuation of the stormwater. The proposed system is primarily a wet detention system consisting of three large basins: A1, B1E(East), and B1W(West). The system has been designed to provide water quality and storm water attenuation prior to overflowing to the Improvement District's Unit 2 master system. As shown in the conceptual plans, Basin B1W is located on the west side of I-95 and has a control elevation of 13.5 feet National Geodetic Vertical Datum (NGVD). Mostly residential development is anticipated in this basin with a small supporting commercial development. An existing 60-inch culvert located under I-95 will continue to connect the two wetland areas, identified as W1 and W2, that are located on both the west and east sides of I- 95, respectively. Basin B1E is located in the southeastern portion of the site and will be controlled at 13.0 feet NGVD. Anticipated development in this area will be mostly residential neighborhoods as well. Exhibit 2 of the Staff Report reflects that runoff from the out-parcels and the northern half of Hood Road will be directed into the proposed project area. Pervious and impervious assumptions were made for future Hood Road improvements and are listed in the land use table. See Respondents' Exhibit 43 at p. 3 of 26. Basin B1E will overflow into the Unit 2 master system via a control structure and outfall pipe which discharges to a wet pond located within the adjacent San Michele development to the east. Industrial and commercial development is planned in Basin A1, which is the northeastern basin. The lakes will be controlled at elevation 13.0 feet NGVD. Runoff from this basin will be directed eastward into the Improvement District's Unit 2 master system via a control structure and pipe connection into the lake within the Legends of the Gardens development to the east. The applicants submitted site grading assumptions and pervious/impervious percentages as well as stormwater modeling to demonstrate compliance with the existing master system for the overall Improvement District's Unit 2 master system. In addition, the system for this basin has been designed to accommodate inflows from approximately 50 acres of I-95 right- of-way through an existing control structure which was permitted as part of the I-95 widening project. The proposed project includes direct impacts to a total of 78.47 acres of on-site wetlands. Wetland mitigation to offset the adverse impacts includes enhancement of 7.50 acres of on-site wetlands; the purchase of 13.70 freshwater herbaceous credits at the Loxahatchee Mitigation Bank; off-site wetland and upland restoration and enhancement of 163.41 acres of wetlands; and preservation of 30.51 acres of other surface waters, or a total of 193.92 acres, at Pine Glades. The ERP Permitting Criteria In order to obtain an ERP, an applicant must satisfy the conditions for issuance set forth in Rules 40E-4.301 and 40E-4.302. Additionally, the District has adopted BOR provisions that implement the relevant portions of the rules. The conditions for issuance primarily focus on water quantity, water quality, and environmental criteria and form the basis of the District's ERP permitting program. The first step in the District's environmental review is to identify wetlands and other surface waters. On March 5, 2009, the District issued a formal determination of wetlands delineating 34 wetland areas and 4 jurisdictional surface water ditches. This determination was not timely challenged and therefore represents final agency action. That determination was used in this permit application. Water Quantity Criteria Rule 40E-4.301(1)(a) requires an applicant to provide reasonable assurances that the propose activity will not cause adverse affects to water quantity, while Rule 40E-4.301(1)(b) requires reasonable assurances that the proposed activity will not cause adverse flooding to on-site or off-site property. The BOR provides a method to calculate allowable discharge rates. The evidence is that the proposed discharge is well within the standards imposed by the rules governing water quantity impacts. There will be no on-site or off-site flooding as a consequence of the proposed project. Rule 40E-4.301(1)(c) requires reasonable assurance that there will be no adverse impacts to existing surface water storage and conveyance capabilities. The evidence supports a finding that the proposed discharge will not cause any adverse impacts. Also, the system is capable of being developed and of functioning as proposed, as required by Rule 40E-4.301(1)(i). Petitioners contended that the project poses a threat of over-draining, which will significantly affect the region directly and cumulatively. However, the project does not pose a risk of over-draining because the control elevation of the project will be maintained at a level consistent with surrounding properties and the proposed drainage rate is less than the allowable rate under the rules. Water Quality Rule 40E-4.301(1)(e) sets forth the requirements relating to water quality. Also, BOR Section 5 contains the design criteria that a project must follow regarding off-site discharges to provide reasonable assurances to satisfy the above rule. Water quality treatment will be provided in a proposed wet detention system which utilizes stormwater ponds. The evidence shows that the ponds are larger than required, thereby providing water quality treatment in excess of what is required by the BOR. All water quality standards will be met. Hazardous Waste Management Plan Petitioners contend that no hazardous waste management plan was submitted to the District. However, a plan is not required now because it would need to address the specific uses for the property, which have not yet been designated. Special Condition 31 of the permit requires that such a plan be submitted at the time an application for construction approval is filed with the District. When this is submitted, it will be reviewed to determine if there are reasonable assurances that hazardous materials, if any, will not enter the proposed project's surface water management system. Elimination and Reduction Under BOR Section 4.2.1, after the District identifies the wetlands and other surface waters, the next step is to consider elimination and reduction of impacts. However, BOR Section 4.2.1.2(b) provides that an applicant is not required to demonstrate elimination and reduction impacts when: the applicant proposes mitigation that implements all or part of a plan that provides greater ecological value and that provides greater long term ecological value than the area of wetland or other surface water to be adversely affected. In considering this provision, the District concluded, consistent with the evidence, that the quality of the wetlands which will be adversely affected by this application is low, and the mitigation proposed will provide greater long-term ecological value than the wetlands impacted. This is because the mitigation at both Pine Glades and the Loxahatchee Mitigation Bank have regional ecological value, and these sites will provide greater long-term ecological value than the impacted wetlands. Secondary Impacts Rule 40E-4.301(1)(f) requires reasonable assurance that the project will not cause adverse secondary impacts to water resources. BOR Section 4.2.7 sets forth the requirements for on-site wetlands that will be preserved and enhanced. Under that section, secondary impacts to the habitat of wetlands associated with adjacent upland activities will not be considered adverse if buffers, with a minimum width of 15 feet and an average width of 25 feet, are provided abutting the wetlands. In this case, the single wetland area being preserved is buffered in accordance with those requirements. Applicants have satisfied the requirements of the rule. Mitigation If impacts to wetlands and other surface waters will occur, then mitigation may be offered to offset the impacts to functions identified in BOR Sections 4.2 through 4.2.9. To assess the impacts and the value of mitigation, the applicants used the statewide Uniform Mitigation Assessment Method and the Wetland Rapid Assessment Procedure. Those results are found in Appendix 1 of the application and in Responses to Requests for Additional Information submitted in August 2009 and January 2010. Page 13 of the Staff Report describes the mitigation. The District also performed its own independent analysis of both the impact and mitigation. That analysis demonstrated that sufficient mitigation is available in the options identified to offset the impacts. In fact, there was a net functional gain to the environment. In order to offset 50.76 acres of wetland impacts, the applicants will provide restoration and enhancement of 139.6 acres of wetlands and 23.81 acres of uplands, and preservation of 30.51 acres of other surface waters, or a total of 193.92 acres, at Pine Glades. Mitigation at this location offsets those impacts and is appropriate because it will provide more functional gain than the amount of functional loss for the same habitat types that are being impacted. Because Pine Glades is within the same drainage basin as the impacts, and the mitigation offsets the impacts, the District is not required to consider cumulative impacts. See § 373.414(8), Fla. Stat.; Fla. Admin. Code R. 40E-4.302(1)(b). Petitioners suggested that because Pine Glades is already owned by the County and intended to be restored, by allowing the applicants to receive mitigation credit for the restoration amounts to "double dipping." However, the evidence shows that the 193 acres proposed as mitigation in the permit is site-specific; no one has ever received mitigation credit for it in the past and no one will be able to receive mitigation credit for it in the future; and The Briger Group paid $86,250.00 per functional unit to reimburse the County for the cost of the land. Mitigation credit for restoration at Pine Glades is appropriate. As compensation for impacts to a total of 26.14 acres of freshwater marsh wetlands, the applicants will mitigate off- site by purchasing 13.70 freshwater herbaceous credits at the Loxahatchee Mitigation Bank. This bank is of regional ecological significance. Mitigation at this bank offsets the impacts and is appropriate because it will offset the impacts to freshwater marsh wetlands. Drainage basins are established by District rule in BOR Figure 4.4-1. While Petitioners contended that BOR Figure 4.4-1 does not accurately identify the geographic boundaries of the South Indian River Basin, which is being used here, the District is required to follow its own rules when reviewing an ERP application. Therefore, the use of Figure 4.4-1 was appropriate to determine whether the project is located within or outside of that drainage basin. Because the Loxahatchee Mitigation Bank is not located within the same basin as the proposed impacts, it was necessary for the District to consider cumulative impacts which will be mitigated at that bank. See § 373.414(8), Fla. Stat. This means that the applicants are required to give reasonable assurances that the impacts proposed for mitigation at Loxahatchee Mitigation Bank would not result in unacceptable cumulative impacts if the regulatory precedent set by the permit were applied to all properties within the basin that have the same type of habitat as that being impacted by the project and that have potential for development. The project will be located in the South Indian River Basin. The District's cumulative impact analysis for that basin supports a finding that there is very limited potential for future wetland loss in the basin and reasonable assurances have been given that there will be no adverse cumulative impacts. See Respondents' Exhibit 60. Species Rule 40E-4.301(1)(d) requires an applicant to demonstrate that the activities will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. This evaluation is limited to wetland-dependent species. Upland species fall outside of the District's jurisdiction. Contrary to Petitioners' assertion, the hand fern is not a wetland-dependent species. Also, the District must rely on State-listed species, and not lists prepared by federal agencies. The evidence shows that the potential for utilization of this site by wetland-dependent species is minimal, and this site does not contain preferred habitat for nesting or denning of wetland dependent listed species. Although the site does not contain preferred habitat, the habitat value currently existing on this site will be replaced with mitigation at Pine Glades and the Loxahatchee Mitigation Bank. Public Interest Test In order to obtain a conceptual approval ERP, an applicant must provide reasonable assurances that the system located in, on, or over wetlands or other surface waters will not be contrary to the public interest and will not be inconsistent with the objectives of the District. See Fla. Admin. Code R. 40E-4.302(1)(a)1.-7.; § 373.414(1), Fla. Stat. The evidence establishes that reasonable assurances were provided to demonstrate that the proposed activities will not adversely affect the public health, safety, or the welfare or property of others; that they will not adversely affect the conservation of fish and wildlife, including endangered or threatened species or their habitat; that there are no issues related to navigability or the flow of water, erosion or shoaling; that the property does not currently provide fishing, recreational values, or marine productivity and is not open to the public; that the activity will be permanent; that there is an archeological site on the property which the applicants will preserve; that the mitigation will more than fully offset the impacts; and that the value of the functions currently being performed will not be adversely affected. Petitioners offered no evidence or analysis to rebut the expert testimony offered by Respondents. After balancing all seven factors, the evidence supports a finding that the activities will not be contrary to the public interest. Florida Coastal Management Program Petitioners contend that the project is inconsistent with the Florida Coastal Management Program (FCMA), which is administered by the Department of Environmental Protection (DEP). They also assert that the District is required to coordinate its review of the application with that agency and that it failed to do so. However, the issuance of the ERP (after a demonstration that all permitting criteria have been satisfied) constitutes certification that the project is consistent with the FCMA and no coordination with DEP is necessary. Other Criteria Any other criteria not discussed herein were either satisfied by the applicants or are not relevant to the project. Petitioners' Evidence Other than very limited cross-examination of some of Respondents' witnesses, Petitioner Minaya did not present any evidence to support his allegations. Other than cross-examination of Respondents' witnesses, Petitioner Tsolkas, a lay person, testified that his standing was based on general concerns that the project would drive species (such as the hand fern) into extinction, that it would pollute waters, including the ICW, and that it would destroy habitat for other species. No competent or persuasive evidence to support these contentions was presented. Other issues raised by Mr. Tsolkas were matters beyond the District's jurisdiction and are not considered in the permitting process.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order granting Application No. 090427-7 with the conditions contained in the Amended Staff Report. DONE AND ENTERED this 30th day of November, 2010, in Tallahassee, Leon County, Florida. S D. R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 30th day of November, 2010.

Florida Laws (5) 120.5730.51373.41457.1057.50
# 9
BERNARD SPINRAD AND MARION SPINRAD vs WILLIAM GUERRERO, CHRISTINA BANG, A/K/A CHRISTINA GUERRERO, AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 13-002254 (2013)
Division of Administrative Hearings, Florida Filed:Marineland, Florida Jun. 14, 2013 Number: 13-002254 Latest Update: Jul. 22, 2015

The Issue The issue to be determined is whether the applicants, William Guererro and Christina Bang, a/k/a Christina Guerrero (Applicants), are entitled to issuance of a Consolidated Environmental Resource Permit and State Lands Approvals for various structures on the Applicants’ property at 58458 Overseas Highway, Marathon, Florida.

Findings Of Fact The Parties Petitioners Bernard Spinrad and Marian Spinrad are the owners of adjoining parcels of property with the addresses of 58418 and 58420 Overseas Highway, Marathon, Florida. They acquired the property in December 2001. They recently completed construction of two residential structures on the properties. The structure at 58418 Overseas Highway is currently listed for sale. The structure at 58420 Overseas Highway is a vacation rental property. Neither structure is Petitioners’ permanent residence. The DEP is the state agency with the power and duty to regulate activities in waters of the state pursuant to chapter 373, Florida Statutes. The DEP also serves as staff to the Board of Trustees of the Internal Improvement Trust Fund (“Board of Trustees”) to review and act on activities on state sovereignty submerged lands under chapter 253. The Applicants, are the owners of adjoining parcels of property with the address of 58478 Overseas Highway, Marathon, Florida (the Property). They purchased the Property in June 2010. The structures that are the subject of the Permit are to be constructed near or waterward of the shoreline of the Property. The Property The Property is located on Grassy Key, an island in the middle Florida Keys, within limits of the city of Marathon, Monroe County, Florida. U.S. Highway 1 passes through Grassy Key. The Property -- as is that of Petitioners -- is situated between U.S. Highway 1 and the open waters of the Atlantic Ocean. In the early part of the 20th century, a portion of Grassy Key was platted as the Crains Subdivision. The properties owned by Applicants and Petitioners are within the Crains Subdivision. During the periods of time directly relevant hereto, the Property has been owned by Burgess Levine, who owned the property during the period prior to the October 2006, landfall of Hurricane Wilma until June 2010, and by Applicants, who have owned the Property since June, 2010. Grassy Key Grassy Key is three-miles long, and has 6800 feet of beaches, none of which are designated as critically eroded. The island fronts the Atlantic Ocean to the east, and the more protected waters of Florida Bay to the west. The waters along the Atlantic Ocean shoreline of Grassy Key in the area at issue are shallow, with an extremely flat bottom having a very gradual slope of approximately 1 to 30, meaning there is a one foot vertical change over 30 horizontal feet. The mean tide range at the Property is about 1.7 feet. Under normal conditions, the stretch of Grassy Key at issue is fairly characterized as a zero-wave energy shoreline. Waves break well offshore and there is negligible wave energy propagating beyond that point. What shoreline energy exists is produced by small tide currents and wind-shear on the water surface that moves water along the shoreline. The direction of the water movement is dependent on tides and wind direction, with the predominant direction being from north to south. Erosive and other significant changes to the shoreline of Grassy Key, including that stretch fronting the Property, are event driven, meaning when there is a coastal storm that causes a rise in the water level, substantially higher than the astronomical tide, waves can propagate onto the shoreline of Grassy Key. The wind and waves can come from virtually any direction depending on the storm. A storm of greater intensity will create higher energy-wave conditions. Although storm conditions may only occur over 1 to 3 percent of a given year, with the rest of the year having zero-wave energy, on average the coastline may be considered to be of moderate-wave energy. The beach sediment along the Grassy Key shoreline in all areas pertinent hereto consists of calcareous material, made up of the breakdown of corals and coralling algae, with a significant fraction of other detrital marine material. The upper beaches of Grassy Key, including that on the Property, generally consist of coarse, calcareous sand with a small fraction of calcareous silt-size particles. The inter-tidal areas along Grassy Key consist of predominantly fine calcareous sand, with a greater fraction of calcareous silt. Extending out into the nearshore area all along Grassy Key, including that fronting the properties owned by Petitioners and Applicants, the sediment becomes a very fine calcareous sand, with a greater fraction of the material being calcareous silts and clays, and with a substantial amount of organic mud of a marine origin, classified as Islamorada muck. Since at least the 1970s, one wading in the nearshore waters along Grassy Key could expect to sink into the surface muck to a depth of anywhere from six inches to two feet. The depth of muck becomes less as one moves further out and approaches the offshore Thalassia beds. Although some areas offer more resistance than others, it is routine to experience difficulty in walking and wading along the coast of Grassy Key because of the high percentage of clays and silts in the substrate. The band of muck narrows as one proceeds towards the northern stretches of Grassy Key, until one reaches the furthest areas to the northeast where the nearshore transitions to exposed rock and hard bottom. The surface muck that exists in the nearshore waters of Grassy Key, having a sizable component of decaying organic material, gives off an odor of hydrogen sulfide when disturbed that some find to be unpleasant. The odor is a naturally- occurring condition of the sediment, and is common in mucky areas all around the southern coasts of Florida. The suggestion that the shoreline in the vicinity of the Petitioners’ property, and that of Applicants, was a naturally occurring white, sandy beach is contrary to the greater weight of the evidence. To the extent the shoreline at Petitioners’ property may have been temporarily altered by the overwash from Hurricane Wilma as discussed herein, Petitioners’ own post-Wilma man-made efforts at beach stabilization, or the redistribution of sediments occasioned by Hurricanes Isaac and Sandy in 2012, the evidence demonstrates the “mucky” condition described herein to be more consistent with the natural and long-standing conditions of Grassy Key. Thus, as Grassy Key exists in the present time, one may expect to encounter six inches to two feet of loose muck anywhere along the nearshore area. Close to shore of Grassy Key are scattered beds of Halodule, a species of seagrass that tends to emerge and grow in shallow waters. The growth of Halodule is influenced by the nature of the sediments, the salinity temperature, and clarity of the water. Storm events have a significant effect on its growth. Given its transient nature, Halodule may vary in any given area from nonexistent, to spotty, to well-established beds. As one moves further offshore, the Halodule transitions to large, continuous beds of Thalassia. Thalassia grows in deeper water, and is common to a depth of about 12 feet. Being deeper and less affected by storm energy, the line of the Thalassia beds off of Grassy Key has not substantially changed over time. As wind and waves come across the grass beds, and as tides ebb and flow, grass blades are cropped. The amount of grass varies seasonally to a degree. The cropped and dislodged seagrasses, along with other organic material entrained therein, are naturally carried by the tides and wind and stranded along the shoreline. The stranded material is known as wrack, and the line of stranded material is known as the wrack line. Grassy Key is well known for the large seagrass wracks that pile up on the shoreline. A wrack line is a normal and natural occurrence in marine environments like that of Grassy Key, and can be a good indicator of the upper edge of the water action at a particular time. The cropping and dislodging of seagrass is accentuated during major or minor storm events. During Hurricane Rita in 2005, a very large seagrass wrack was blown onto the shoreline of Grassy Key. It was subsequently blown back out to sea by the overwash from Hurricane Wilma. The decomposition of the seagrass and other organic materials creates a significant odor that is not uncommon. That odor of decomposing material is well-recognized as being associated with Grassy Key. Areas along the shoreline of Grassy Key have been used by sea turtles for nesting. However, the nature of the substrate in the area of the Property is not optimal for nesting. Generally, sea turtles require a nesting site with 15 to 20 inches of sand above the water table so as to allow them to dig a suitably deep and dry cavity for their eggs. The natural substrate along the section of Grassy Key at issue is coarser and more difficult to dig into, and does not have the depth of sand for the best chance of a successful nest. Despite the nature of the substrate, Petitioner testified as to her observation of turtle nests along her property in each year from 2006 through 2010. Since the SW Groin, the Mid-bulkhead, and the NE Groin were all in existence and functioning during that period, with work to the SW Groin having been completed by 2008, the preponderance of the evidence demonstrates that those structures have no effect on the success or failure of sea turtles to nest along the property. To the extent nesting has been disrupted since 2011, the most logical inference that can be drawn from the evidence is that such disruption is the result of the Mid-Jetty Extension, which is slated for removal under the terms of the Permit. The preponderance of the evidence demonstrates that the structures and activities authorized by the Permit will have no adverse effect on sea turtles. Hurricane Wilma In October, 2005, Grassy Key was pounded by Hurricane Wilma. The storm passed to the north, and created a substantial storm surge that moved from west to east across Grassy Key. The storm surge created a “ridge and runnel” effect on the Atlantic facing shoreline, with the channelization of the storm tide flow creating erosion and gullies on upland shore-adjacent properties. The storm surge and flooding across Grassy Key caused substantial wash-outs of sand; transported a large volume of sandy, upland sediments into the nearshore waters of the Atlantic Ocean; and created washover “fans” of material along the shoreline of Grassy Key. The effects of the Hurricane Wilma storm surge manifested just north of the Property, became substantial at the Property, and continued south down the shoreline for a considerable distance. At the Property, sand was pushed from 50 to 100 feet waterward from the existing shoreline, and a substantial runout was created running parallel and north of the SW Jetty. The sand pushed into the water buried everything in its path, including seagrasses. In short, the post-Wilma shoreline from the Property south along Grassy Key was left in a completely disrupted state. The nearshore waters fronting the properties owned by Petitioners and Applicants were affected by the deposition of sandy, upland sediments, which temporarily created areas of substantially harder-packed sediment. Over time, as the shoreline equilibrated and the sandy sediment distributed through a broader area, more typical shoreline conditions returned. The photographic evidence demonstrates that the Mid- bulkhead and the SW jetty structures were impacted by the Hurricane Wilma storm surge. In addition, the sandy area between the mid-bulkhead and the SW jetty was pushed seaward from its previous location. The scars from Hurricane Wilma remain evident through the most recent aerial photographs received in evidence. It is visually apparent that seagrass, though reappearing in patches, has not reestablished in the nearshore areas along the affected shoreline of Grassy Key -- including the areas in front of the Property and the property owned by Petitioners -- to the extent that it existed prior to the storm. Post-Wilma Activities When Hurricane Wilma hit, the Property was owned by Burgess Lea Levine. Not long after Hurricane Wilma, Ms. Levine shored up the SW Jetty, and performed work in the “beach” area between the mid-bulkhead and the SW jetty. The photographic evidence also supports a finding that the rock outline of the Mid-jetty was reestablished to its pre-Wilma configuration. The repairs to the SW Jetty resulted in a structure that is virtually indistinguishable in size and shape to the SW Jetty as it presently exists. The wrack line at the beach area after it was “worked” following the passage of Wilma, shows the area in which work was done to be generally consistent with -- though slightly seaward of -- the 2005 post-Wilma shoreline. In 2008, Ms. Levine applied for a series of exemptions and for consent of use for state-owned lands for “shoreline repair, replace earthen ramp with a concrete ramp, repair wood deck, replace mooring piles & maintenance dredge existing channel w/in Atlantic Ocean.” On September 19, 2008, the DEP issued a regulatory authorization and proprietary submerged land approval. The Rights of Affected Parties that accompanied the September 19, 2008, notice provided that “[t]his letter acknowledges that the proposed activity is exempt from ERP permitting requirements” and that “this determination shall expire after one year.” The notice of Rights of Affected Parties did not apply to the proprietary authorization. At some time after issuance of the regulatory authorization, Ms. Burgess initiated additional work to repair the SW Jetty. The photographic evidence, which is persuasive, indicates that the work on the SW Jetty, including the concrete cap, was complete by the end of 2008. When Applicants purchased the Property, the determination of exemption issued in 2008 had, by application of the notice of Rights of Affected Parties, expired. Shortly after the Applicants purchased the property, they had the existing family home demolished. Applicants intend to construct a winter vacation home for their personal use on the property. 2012 Storms In August and October 2012, Grassy Key was subject to event-driven conditions as a result of the passage of Hurricanes Isaac and Sandy. Those storms redistributed large areas of sediments that had been moved offshore by the effects of Hurricane Wilma. The Proposed Permit The February 20, 2013, Permit provides that the structures described herein do not require the issuance of an Environmental Resource Permit, subject to the criteria and conditions in Florida Administrative Code Rule 40E-4.051. The Permit provides that the boat ramp is eligible to use the general permit in Florida Administrative Code Rule 62-330.417, the repair and replacement of the dock is exempt pursuant to section 403.813(1)(b), Florida Statutes, the maintenance dredging of the Channel is exempt pursuant to section 403.813(1)(f), and that the repair and replacement of the NW Jetty, the SW Jetty, and the Mid-bulkhead are exempt because the structures are “historic in nature and pre-dates Department regulations.” In addition to the regulatory authorizations, the Permit granted proprietary authorization by Letter of Consent for the dock pursuant to Florida Administrative Code Rule 18- 21.005(1)(c)4., and for the Channel, the NW Jetty, the SW Jetty, and the Mid-bulkhead pursuant to rule 18-21.005(1)(c)7. The Permit established the mean high-water line as that existing in 1974 and depicted on the “Richmond Survey.” Proprietary authorization for the boat ramp was determined to be unnecessary due to its location above the mean high-water line. Finally, proprietary authorization for the “Sandy Area” or beach between the Mid-bulkhead and SW Jetty was granted by Letter of Consent pursuant to rule 18-21.005(1). On September 20, 2013, the DEP filed a Notice of Additional Grounds for Exemption Determination, in which it found each of the structures subject to the regulatory review to “have only minimal or insignificant individual or cumulative adverse impacts on water resources” and to thus be exempt from the need to obtain an Environmental Resource Permit pursuant to section 373.406(6), Florida Statutes. On December 12, 2013, Applicants filed a Notice of Filing Proposed Changes to the Pending Agency Action in which they agreed to certain additional conditions, and which referenced the October 1, 2013, repeal of rule 40E-4.051, and its replacement by the “Statewide ERP rules.” For purposes of this de novo proceeding, the proposed Permit at issue includes the February 20, 2013, Permit; the September 20, 2013, Notice of Additional Grounds for Exemption Determination; and the December 12, 2013, Notice of Filing Proposed Changes to the Pending Agency Action. The Proposed Structures Groins There has been some confusion relating to the names of the structures that are subject to the proposed Permit. Two of the structures are referred to as jetties, the NE Jetty and the SW Jetty, and the middle structure is referred to as the Mid- bulkhead. A jetty is a navigation structure that is constructed at a barrier inlet. Its purpose is to stabilize the inlet and prevent shoaling by “jetting” current and wave-driven sand further offshore, such that the offshore bar is moved into deep enough water to allow navigation in and out of the tidal inlet, and allowing the tidal current between the ocean and the receiving body of water to keep the inlet scoured and open. There are 48 jetties on the open coast of Florida, none of which are in the Florida Keys. A groin is a structure designed for shore protection purposes. A groin is typically aligned perpendicular to the shoreline, or “shore normal.” The structures identified in the Permit as the NE Jetty and the SW Jetty are clearly groins, and not jetties. The mid-bulkhead is a groin, generally for shore confinement, with a channel-facing bulkhead. For purposes of continuity, the structures will be identified by the names given them in the Permit. Since there is negligible wave energy along the shoreline normal conditions, the groins have little or no day- to-day effect on longshore transport. Under storm conditions, the structures affect longshore transport, as evidenced by accretional “fillets,” and function as shoreline protection and confinement structures. The rock groins provide shelter, habitat and structure for corals, sponges, lobster, and fish in the area. The preponderance of the evidence demonstrates that the groins authorized by the Permit will have no adverse effect on fish and wildlife resources. NE Jetty The NE Jetty was originally constructed in the early 1960s, likely concurrent with the dredging of the navigational channel. The quality of the aerial photographs of the period make it difficult to tell if the NE Jetty was a loosely-placed rock embankment or a more well-designed and constructed structure. However, the fillet of sand accreted to the north of the Channel demonstrates that the jetty was in existence and functioning as a shore-protection structure. By the 1970s, the NE Jetty had become overwhelmed by longshore sediment transport from the northeast. Sediment overtopped the NE Jetty and filled in the landward reaches of the Channel. At that point, ability of the NE Jetty to perform as a shore protection structure was compromised to the point that it could no longer hold the shoreline out of the basin or the landward portion of the Channel. The Mid-bulkhead became the dominant structural control over the shoreline and started to accrete the shoreline to the northeast. At some time between 1977 and 1981, the Channel was maintenance dredged pursuant to a permit issued by the Department of Environmental Regulation, DEP’s predecessor agency. The NE Jetty appeared on the plans for the maintenance dredging. Thus, the most reasonable inference that can be drawn from the evidence is that the NE Jetty was repaired and restored in conjunction with the approved maintenance dredging. By 1981, the NE Jetty had been restored as the dominant shore protection structure north of the Channel, and a fillet of accreted material had been reestablished. The aerial photographs from that period are not sufficiently distinct to determine the precise size, shape, and configuration of the NE Jetty at that time. However, there is no evidence of additional work having been performed on the NE Jetty between 1981 and 1985. By 1985, the NE Jetty existed in substantially the size, shape, and configuration as it existed at the time of Hurricane Wilma. Between 1981 and the 2005 arrival of Hurricane Wilma, the evidence is convincing that the NE Jetty was holding up the shoreline to the northeast and preventing sediment from filling in the upper reaches of the Channel. Although the evidence suggests that the NE Jetty had, by 2005, begun to show its age, the continuous presence of an accretional fillet demonstrates that it continued to serve its function as a shore-protection structure. Although the NE Jetty suffered damage from Hurricane Wilma, it continued to perform its shoreline protection function. Aerial photographs taken in 2009 and 2011 show a relatively distinct structure with a well-defined accretional fillet. Thus, the greater weight of the evidence demonstrates that, at the time of its repair in May 2011, the NE Jetty was a functional groin. The NE Jetty, as repaired in 2011, is of substantially the same size, shape, and location as the structure depicted in aerial photographs taken in 1985, 2009, and early 2011. Although the elevation of the structure was increased over its pre-repair elevation, the increase was that reasonably necessary to prevent the function of the structure from being compromised by the effects of age and weather. The work performed on the NE Jetty, consisting of new rock laid on top of the existing rock, constituted repair and maintenance of the existing structure. Since 2005, and at the present time, the shoreline north of the NE Jetty has reached a state of equilibrium and stability, and is not expected to change significantly from its current condition. The preponderance of the competent, substantial evidence demonstrates that the effect of the NE Jetty on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners is minimal and insignificant. The sand and sediment accreted to the north of the NE Jetty since 1981 is in the range of 250 square feet. SW Jetty The aerial photographs from 19647/ demonstrate that some form of structure then existed at the location of the current SW Jetty. The structure is indistinct due to what appears to be sidecast material from a small channel in front of the property to the immediate south of the Property. By 1971, the SW Jetty had become more distinct. From that time forward, the SW Jetty, and its accompanying fillet of accreted material, appears in roughly the size and shape of the structure as it appeared immediately prior to the arrival of Hurricane Wilma. The SW Jetty was heavily impacted by Hurricane Wilma. The overwash from the storm created a substantial runout alongside the SW Jetty, and the post-storm aerials suggest that the jetty boulders were undermined and shifted from their more uniform 2003 appearance. Immediately after Hurricane Wilma, the owner of the Property commenced restoration and repair activities. As part of the activities, the SW Jetty was repaired with the addition of boulders, which were often three feet and every now and then as much as four feet across. The boulders, being irregularly shaped, could not be stacked like Legos®, so the repairs were not neatly within the precise pre-Wilma footprint. However, the repaired SW Jetty was substantially in the length and location as existed prior to Hurricane Wilma, though it may have had a slightly wider cross-section. By 2007, the work on the SW Jetty was complete, and it had assumed its present appearance with the addition of a concrete cap. Its appearance -- i.e. length, width, and location -- in 2007 and 2008 was not dissimilar from its appearance in 2003. As repaired, the SW Jetty effectively constitutes the same structure that it has been since its initial construction. From a coastal engineering perspective, the work that was performed on the SW Jetty, consisting generally of new rock laid on top of the existing rock, constituted repair and maintenance of the existing structure. Dr. Lin testified that between 1974 and 2011, the area to the southwest of the southwest jetty was “about equalized,” though it was “accreting a little bit.” Thus, the effect of the SW Jetty on the shoreline of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners from 1974 to 2011 was minimal and insignificant. Dr. Lin testified that, since 2011, the same area had eroded. The only substantive shoreline change that logically accounts for that subsequent erosion is the Mid-bulkhead extension, which is slated for removal under the terms of the proposed Permit. Petitioner testified that she observed no adverse effects from activities on the Property until after February 2011.8/ Since work on the SW Jetty was complete by no later than 2008, Petitioner’s testimony supports a finding that the SW Jetty has had no measurable effect on the water resources in the vicinity of the properties owned by Applicants and Petitioners. The preponderance of the competent, substantial evidence demonstrates that the effect of the SW Jetty on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners is minimal and insignificant. Mid-bulkhead The structure of the Mid-bulkhead first appeared as part of the sidecast material from the excavation of the navigation channel in 1964. It coalesced into a defined but smaller and more rudimentary structure in the 1971-1972 time period. At that time, it was acting as the predominant shore protection structure due to the overtopping of the NE Jetty with sediment, which also filled in the landward reaches of the Channel. By 1981, after the maintenance dredging of the Channel, the Mid-bulkhead had assumed substantially the size, shape, and location that it has currently. The Mid-bulkhead has a navigation function of protecting the landward extent of the Channel from the collapse of adjacent sand and sediment, and a shore protection and compartmentalization function. Those functions have been consistent since 1981. The Mid-bulkhead appears to have been subjected to the overwash of sand and sediment from Hurricane Wilma, though it maintained its shape and form. The outline of the Mid-bulkhead appears to be more well-defined after the initial post-Wilma repairs. In any event, the configuration and size of the Mid-bulkhead is substantially the same as it had been since 1981. At some point, the interior section of the Mid- bulkhead was topped with soil that is inconsistent with that naturally occurring in the area. That fill was confined, and brought the Mid-bulkhead to a more even grade with the rock outline, but could have had no measurable effect on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners. The preponderance of the competent, substantial evidence demonstrates that the effect of the Mid-bulkhead is minimal and insignificant. Channel In 1961, the Department of the Army authorized dredging of a navigation channel at the Property. The approved channel was to be 700 feet long, 30 feet wide, and to a depth of five feet below mean low water. The Florida Trustees of the Internal Improvement Fund issued a letter of no objection. By 1964, the Channel that is the subject of this proceeding had been dredged, though not to the 700-foot length approved. Rather, the Channel was dredged to a length of approximately 290 feet. Much, if not all of the dredge spoil was sidecast, creating a rock structure alongside the Channel. Measurements taken during the course of this proceeding demonstrate that the initial dredging resulted in near vertical side slopes, which shows that the bailing of the bedrock was accomplished to the limits. The width of the Channel is from 28 feet to 32 feet wide, which is within an acceptable tolerance of the 30-foot approved width. In 1976, the then-owner of the Property sought a permit from the DEP’s predecessor, the Department of Environmental Regulation, to maintenance dredge the Channel to a dimension of 290 feet long and 30 feet wide, to a depth of minus 8-feet mean high water, and to construct a new rock jetty to extend 230 feet waterward from the existing terminus of the NE Jetty. Given the mean tide range of 1.7 feet at the Property, the depth of the proposed dredging would have been minus 6.3 feet mean low water, or 1.3 feet deeper than originally approved. The permit drawings depict the existing NE Jetty, the Channel boundary, the outline of the Mid-bulkhead, and the sidecast rock structure alongside the southern side of the Channel. The permit was denied. In 1977, the owner of the property reapplied for a permit to maintenance dredge the Channel to a dimension of 290 feet long and 30 feet wide, and to a depth of minus 4.0 feet below mean low water nearshore to minus 6 feet below mean low water at the waterward end. The proposal to construct an extension of the NE Jetty was deleted. The permit was issued, and a severance fee for the dredged material was paid based on a projected 700 cubic yards of material removed. The permit drawings and photographs depict the existing NE Jetty, the nearshore Channel boundary, and the general outline of the Mid- bulkhead. By 1981, aerial photographs demonstrate that the maintenance dredging of the Channel was complete, the NE Jetty was in place and functioning to protect the shoreline as evidenced by the accretional fillet, and the Mid-bulkhead had assumed its approximate current shape and configuration. Although the Channel has varied in depth over the years since the maintenance dredging and Hurricane Wilma, the greater weight of the evidence, including photographic evidence, indicates that the Channel was well-defined and remained navigable during that period. The Channel is an open-water exposed channel. Water in the Channel mixes due to direct tidal flow and the sheet flow of water due to shear wind stress. As water passes over the Channel, it sets up gyre, which is a mixing process. The open- water exposed Channel is subject to a high degree of mixing, even on normal waveless conditions, because of the wind transport of water and the tidal transport of water. The Channel is not a semi-enclosed basin. A semi- enclosed basin does not receive the direct forcing functions that an open-water channel receives. A semi-enclosed basin has no direct connection to open waters, but is connected to open waters by a narrower opening. Although a semi-enclosed basin exchanges water via every tidal cycle, the flushing process is one of slow mixing, in which a little bit of water is added to and withdrawn from the larger basin through the narrow opening during each tidal cycle. In such a case, a flushing analysis may be necessary to determine how much time and how many tidal cycles it may take to effect a complete exchange of the water in the semi-enclosed basin, and thus, for example, to dilute a pollutant to an acceptable level. A flushing analysis is not needed in this case because the Channel is an open-water, openly-exposed location subject to a high degree of mixing under normal day-to-day tidal processes. There is no greater basin connected by a restricting connection as with a semi-enclosed basin. Rather, the Channel has direct exposure to the tides, along with wind shear stress moving the water. The evidence in this case is substantial and persuasive, because the Channel is highly exposed to the open water and the tides, and a well-mixed and well-flushed aquatic system, that a flushing analysis is neither required nor necessary. Dock The dock made its first obvious appearance in 1981. It appears in a consistent shape and appearance through 2011. Aerial photographs taken in 2012, after the maintenance dredging of the Channel was conducted, show the dock had been removed. At the time of the hearing, the Applicants had installed new pilings and vent boards for the replacement dock, but the decking had not been installed. Work to complete the replacement of the dock was halted due to the pendency of the litigation challenging the structures. The proposed dock is less than 500 square feet. It is proposed for non-commercial, recreational activities. It is the sole dock proposed on the Property. The proposed dock will not impede the flow of water or create a navigational hazard. Boat Ramp Since the issuance of the 2008 approval, the boat ramp site was graded and stabilized in limerock material. The concrete ramp was not completed due to the pendency of the litigation challenging the structures. However, Applicants propose to pave the ramp with concrete. Based on Mr. Clark’s observations during his site visits, the boat ramp is landward of the mean high waterline depicted on the survey. The preponderance of the evidence demonstrates that the proposed boat ramp will provide access to the Channel, which provides a minimum navigational access of two feet below mean low water to the ramp. Applicants have agreed to install depth indicators at the ramp to identify the controlling depths of the navigational access. The work on the ramp involves no seagrass beds or coral communities. The ramp as proposed will require no more than 100 cubic yards of dredging. The total width of the ramp is to be 20 feet and the ramp surface will be no wider than 12 feet. Beach Area The area between the SW Jetty and the Mid-bulkhead is an accreted beach-type area that has been confined and protected by the Mid-bulkhead and the SW Jetty. The shoreline landward of the mean high water line, from the dry beach and to the upland, is somewhat steeper than adjacent unprotected shorelines, which is indicative of the grooming of the upper beach sediment and the stability of the shoreline between the Mid-bulkhead and the SW Jetty. As a result of the Hurricane Wilma storm surge, a substantial amount of sediment was swept across the Property and into the Atlantic waters. The beach area was inundated with sand and sediment from the overwash, which appears to have moved the shoreline well waterward of its previous position. Along the northern side of the SW Jetty, a substantial channelized gully was created. The configuration of the shoreline post-Wilma suggests that efforts were made by the then-owner of the Property to fill in the gully on the northern side of the SW Jetty, and to groom and restore the shoreline by redistributing sand and sediment on the Property. It is typical, and allowable under DEP emergency final orders, for affected property owners to redistribute overwashed deposits and place them back within the beach system. In that regard, the DEP encourages the redistribution of clean beach sand back onto the beach. The then-owners of the Property were not alone in taking steps to address the effects of Hurricane Wilma on their adjacent shorelines. The photographic evidence demonstrates that Petitioners engaged in similar restorative activities, which included bringing in material purchased from a contractor to fill in a gully created on their property by the overwash. Observation of representative soil samples from the beach area demonstrate that the soils are consistent with those in the upper beach areas found throughout the area. The only areas of inconsistent soils were found in the interior of the rock structure of the Mid-bulkhead, which contained a four to six-inch layer of soil with a different consistency and darker brown color, and small area of similar soil directly adjacent thereto and well above the mean high water line. The greater weight of the competent, substantial, and credible evidence demonstrates that there was no substantial amount of “fill” from off-site placed on or adjacent to the beach area. Rather, the nature, appearance, and composition of the soils suggests that the temporary increase in the size of the beach area after Hurricane Wilma was the result of grooming and redistribution of sand and sediment pushed onto the Property and into the nearshore waters by the Hurricane Wilma storm surge. In the years since Hurricane Wilma, the influence of normal tidal and weather-driven events has returned the beach area between the mid-bulkhead and the SW jetty to roughly the configuration that existed prior to the passage of Wilma, though it remains somewhat waterward of its pre-Wilma location.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law set forth herein it is RECOMMENDED that the Department of Environmental Protection enter a final order approving the February 20, 2013, proposed Permit, as conditioned by Applicants’ December 12, 2013, Proposed Changes to the Pending Agency Action. DONE AND ENTERED this 25th day of July, 2014, in Tallahassee, Leon County, Florida. S E. GARY EARLY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of July, 2014.

Florida Laws (15) 120.52120.565120.569120.57120.595120.68253.141267.061373.406373.4131373.414373.421379.2431403.81357.105 Florida Administrative Code (7) 18-21.00318-21.00418-21.00518-21.005128-106.10462-110.10662-330.417