DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs STUART C. WINSTON, D/B/A BACK BAY HOMES, 09-005522 (2009)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Oct. 08, 2009 Number: 09-005522 Latest Update: Apr. 15, 2011

The Issue The issue is whether Respondent violated Subsections 489.129(1)(g)2., (j), and (m), Florida Statutes (2005),1 by allegedly engaging in financial mismanagement or misconduct in the practice of contracting that causes financial harm to a customer, abandoning a construction project, or committing misconduct or incompetence in the practice of contracting.

Findings Of Fact Petitioner is the state agency responsible for regulating the practice of contracting in the state. Respondent is licensed in the state as a certified general contractor pursuant to license number CGC59204. Respondent is the qualifier of South West Florida Development Corporation (South West) doing business as Back Bay Homes (Back Bay). On February 7, 2006, Respondent executed a contract with Gail and Gary Veith to build a residential home on a vacant lot located at 3218 Southwest 11th Place, Cape Coral, Florida. The contract price was $276,983.00 (the initial contract). The initial contract provided for the construction of a sea wall at a cost of $17,257.00 in addition to the contract price of $276,983.00. On February 7, 2006, Respondent entered into a second contract with Mr. and Mrs. Veith. The only difference between the initial and second contracts was the contract price of each contract. The second contract price was $289,686.00, excluding the sea wall cost of $17,257.00. Mr. and Mrs. Veith secured payment of the construction project with a construction loan from Market Street Mortgage Corporation (Market Street) in the original approximate amount of $412,000.00. The total loan amount was intended to be sufficient to cover the second contract price of $289,686.00 and the amount contracted by Mr. and Mrs. Veith for acquisition of the vacant lot (construction site), which was $128,000.00.2 Clear and convincing evidence shows that Respondent engaged in financial mismanagement or misconduct in the practice of contracting that caused financial harm to his customers in violation of Subsection 489.129(1)(g)2. Clear and convincing evidence also shows that Respondent committed incompetence and mismanagement in the practice of contracting. The percentage of completion of the residence, which was zero, was less than the percentage of the contract price paid to Respondent, which was 29 percent. Respondent received approximately $84,655.00 in construction loan proceeds from Market Street in two draws. Market Street paid the first draw at closing on May 5, 2006, in the amount of $42,901.20 and paid the second draw to Respondent on June 26, 2006, in the amount of $41,754.00. However, Respondent never commenced construction of the residence. Respondent reported a profit of $48,637.72 on the Veith property and completed only the sea wall at a cost of $17,257.00. Respondent paid the cost of the sea wall and other expenses on the Veith property to keep the net profit at $48,637.72. Other expenses included $420.00 for surveys, $34.34 for blue prints, $1,707.75 for plan drafts, $350.00 for septic engineering, and $3,138.19 for construction loan interest. Respondent was not entitled by the terms of the contract to retain the funds paid to Respondent by Market Street. The loan agreement provided that draws were to be made at the discretion of Market Street based on work completed and materials incorporated into improvements. Respondent never commenced construction of the residence. Respondent did not obtain permits for the job. Mr. Winston testified that when Market Street transferred a single, lump sum deposit to his company in the amount of $41,754.00 on June 26, 2006, he did not know that he was appropriating funds he was not entitled to under the contract. When that testimony is weighed against evidence that the work Mr. Winston had performed was limited to a sea wall costing only $17,257.00, the testimony is persuasive evidence to the trier of fact that Respondent engaged in mismanagement.3 Respondent billed Market Street for payment of the sea wall when Respondent completed the sea wall. However, the draw schedule in the loan documents does not provide a draw payment for the sea wall. Respondent stopped paying construction interest that Respondent was obligated to pay under the terms of the construction loan. Thereafter, Mr. and Mrs. Veith paid construction interest of approximately $13,800.00. Clear and convincing evidence shows that Respondent abandoned the construction project within the meaning of Subsection 489.129(1)(j). Respondent failed to perform any work on the residence for 90 consecutive days without just cause. Respondent did not notify Mr. and Mrs. Veith that Respondent had abandoned the project. Rather, Mr. and Mrs. Veith started receiving requests for payment of construction loan interest. Respondent failed to conduct any construction activity on the project site for more than 90 consecutive days. On May 13, 2008, Mr. and Mrs. Veith received notice that their loan had been assigned from Market Street to Gulf Coast Bank & Trust Company (Gulf Coast). Gulf Coast sent Mr. and Mrs. Veith repeated demands for payment of the construction loan principal and interest. Mr. and Mrs. Veith entered into a transaction identified in the record as a "short sale" in which they sold the construction site, which they originally purchased for $128,000.00, for $20,000.00. The $20,000.00 sale proceeds were paid to Gulf Coast. Mr. and Mrs. Veith have been financially unable to make payments to Gulf Coast. They remain liable for the full amount of the loan, including delinquent principal and interest. Mr. and Mrs. Veith brought a civil action against Respondent. They were unable to sustain the action because they could not afford the attorney fees. Petitioner incurred investigative costs in this matter of $204.26. The investigative costs do not include attorney time.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Petitioner enter a final order finding that Respondent is guilty of the violations alleged in the Administrative Complaint; imposing the fines enumerated in paragraph 24 of this Recommended Order; requiring Respondent to pay investigative costs in the amount of $204.26; and requiring Respondent to make full restitution to Mr. and Mrs. Veith in the amount of $61,747.72. DONE AND ENTERED this 12th day of July, 2010, in Tallahassee, Leon County, Florida. S DANIEL MANRY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 12th day of July, 2010.

Florida Laws (4) 120.569120.57489.129901.20 Florida Administrative Code (1) 61G4-17.001
# 1
DEPARTMENT OF FINANCIAL SERVICES, DIVISION OF WORKERS' COMPENSATION vs BRAVO CONSTRUCTION, INC.,, 04-004569 (2004)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Dec. 21, 2004 Number: 04-004569 Latest Update: Jun. 27, 2005

The Issue The issues are: (1) Whether Respondent, Bravo Construction, Inc. ("Respondent"), was in violation of the workers’ compensation requirements of Chapter 440.107, Florida Statutes (2003),1/ by failing to secure workers’ compensation coverage for its workers; (2) Whether such individuals possessed current valid workers’ compensation exemptions; and (3) Whether Respondent paid its workers remuneration outside of Respondent’s employee leasing company.

Findings Of Fact The Department is the state agency responsible for enforcing the requirement of Section 440.107, Florida Statutes, which requires that employers secure the payment of workers’ compensation coverage for their employees. Respondent is a company engaged in the construction industry. Specifically, Respondent's business is framing houses. At all time relevant to this proceeding, Elias Bravo was president of the company. On May 26, 2004, the Department’s investigators, Carol Porter and Kelley Dunning, conducted a random visit of a work site in Grassy Point, a gated community in Port Charlotte, Florida, and discovered Mr. Bravo and his workers on site as the house-framers. When the investigators arrived at the site, they spoke with Mr. Bravo, who advised the investigators that Respondent utilized a personnel leasing company, Time Management, which was actually a brokerage firm for Southeast Personnel Leasing, Inc. ("SEPL"), to secure workers’ compensation coverage. On May 26, 2005, Mr. Bravo was the only person in his crew who had coverage with SEPL. At the time of the site visit, the other men were not listed with SEPL because Mr. Bravo still had their applications in his car. After Respondent was unable to provide proof that the men had workers' compensation coverage pursuant to Subsections 440.107(3) and (7)(a), Florida Statutes, the investigators issued a Stop Work Order to Respondent while at the work site on May 26, 2004. On the same day that the Stop Work Order was issued, Investigator Dunning served Mr. Bravo with a Request for Production of Business Records for Penalty Assessment Calculation ("Request for Production of Business Records"). The Department requested copies of Respondent's business records in order to determine whether Respondent had secured workers' compensation coverage; whether Mr. Bravo or Respondent's employees had workers' compensation exemptions; and, if not, to determine the penalty assessment. In response to the Request for Production of Business Records, Mr. Bravo provided certificates of insurance, Respondent's check stubs written to various entities or individuals on behalf of Respondent, payroll records, and Form 1099s for the year ending 2003. Many of the documents provided by Mr. Bravo indicated that Respondent made payments directly to the entities and individuals. The Department maintains records regarding the workers' compensation coverage of individuals and entities in a statewide database called Compliance and Coverage Automated System ("CCAS"). The CCAS database is utilized by the Department to verify if an individual or entity has workers' compensation coverage or a valid exemption from coverage. As part of the Department's investigation, Investigator Porter conducted a CCAS search for Respondent's workers’ compensation insurance coverage records. This search verified that Mr. Bravo had workers' compensation coverage. However, many of the workers or entities to whom Respondent made direct payments did not have workers’ compensation coverage or current valid workers’ compensation exemptions. Based on a review of the payroll records, check stubs, and the Form 1099s that Respondent provided to the Department, Investigator Porter determined that Respondent was an "employer" as that term is defined in Subsection 440.02(16), Florida Statutes. Subsequently, the Department reassessed the original penalty and issued the Amended Order with the attached penalty worksheet which detailed the basis of the penalty assessment. In determining the amended penalty assessment, Investigator Porter disregarded and did not include Respondent's payments to any individual or entity that had workers’ compensation coverage or an exemption from such coverage. The Amended Order, which reflected a penalty assessment of $97,416.68, was issued to Respondent on May 28, 2004.2/ Respondent paid remuneration to the individuals listed on the penalty worksheet of the Amended Order for work they performed. Nonetheless, during the period covered by the penalty assessment, Respondent did not secure workers' compensation coverage for the individuals listed on the penalty worksheet, and none of them had workers' compensation coverage or exemptions from such coverage. The individuals listed on the penalty worksheet of the Amended Order were Respondent's employees during the relevant period, in that they were paid by Respondent, a construction contractor, and did not have workers’ compensation coverage or an exemption from such coverage. Mr. Bravo had workers' compensation coverage through SEPL. However, none of the employees listed on the Amended Order had workers' compensation coverage through SEPL, because they were paid directly by Respondent. A personnel leasing company provides workers' compensation coverage and payroll services to its clients, then leases those employees back to the clients for a fee. Respondent was a client of SEPL, and based on that relationship, Mr. Bravo believed that he and his workers received workers' compensation coverage through that personnel leasing company. However, the workers' compensation coverage provided by SEPL applied only to those employees SEPL leased to Respondent. In the case of leased employees, Respondent would have to make payments to the leasing company and not directly to his workers. The leasing company would then, in turn, pay the leased employees. When, as in this case, the construction company makes direct payments to individuals performing construction work, those workers are not leased employees and, thus, are not secured by the workers’ compensation coverage provided by the personnel leasing company. See § 468.520, Fla. Stat. Some of the individuals listed on the penalty worksheet may have been "dually employed"; that is, sometimes they were employed by Respondent and at other times, they were employees of SEPL and were leased to Respondent. However, during the periods in which individuals worked for Respondent and were paid by Respondent, and were not paid by SEPL, they were without workers’ compensation coverage unless Respondent provided such coverage. With regard to the individuals listed on the penalty worksheet, Respondent provided no such coverage. Respondent, through Mr. Bravo, paid its employees directly, thus, circumventing SEPL and losing the coverage that the employees may have had through it. The Department assessed the penalty against Respondent based on the remuneration Respondent gave directly to the employees outside of SEPL, the class code assigned to each employee utilizing the SCOPES Manual adopted by the Department in Florida Administrative Code Rule 69L-6.021, and the guidelines in Subsection 440.107(7)(d), Florida Statutes.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Financial Services, Division of Workers’ Compensation, enter a final order that affirms the Stop Work Order and the Amended Order of Penalty Assessment, which imposes a penalty of $97,416.68. DONE AND ENTERED this 10th day of May, 2005, in Tallahassee, Leon County, Florida. S CAROLYN S. HOLIFIELD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of May, 2005.

Florida Laws (8) 120.569120.57440.02440.10440.107440.38468.520468.529 Florida Administrative Code (1) 69L-6.021
# 2
LARRY E. SHIMKUS vs DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD, 03-003543 (2003)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 26, 2003 Number: 03-003543 Latest Update: Sep. 15, 2005

The Issue The issues in each case are whether, pursuant to Sections 489.141 and 489.143, Florida Statutes (2003), a claimant is entitled to payment from the Construction Industries Recovery Fund, and, if so, whether, pursuant to Section 489.143(7), Florida Statutes (2003), Respondent may automatically suspend the residential contractor's license of Petitioner until Petitioner reimburses Respondent for the paid claim.

Findings Of Fact Petitioner is licensed as a certified residential contractor, holding license number CRC 013599. Respondent first issued a residential contractor's license to Petitioner in 1978, and Petitioner has been continually licensed since that time. Petitioner has never been disciplined by Respondent or any local governmental agency. On January 29, 2004, Respondent transmitted to the Division of Administrative Hearings seven files containing administrative complaints alleging disciplinary breaches against Petitioner for many of the transactions covered in the nine subject cases. These seven new cases have not yet been heard, and Respondent has not yet entered any restitution orders against Petitioner. In the past, Petitioner has placed his residential contractor's license with various corporations to qualify them to perform residential construction. In February 1999, Petitioner met with Lori Thomson, president of Thomson Homes, Inc., to discuss placing his license with her residential construction company. Now inactive, Thomson Homes, Inc., had been in the residential construction business since at least 1994, operating out of an office in Palm Beach County, which is also the location of all but one of the residential construction jobs that are the subject of these cases. Since 1994, Thomson Homes, Inc., had used the general contractor's license of Ms. Thomson's husband, Steven Thomson, to qualify to perform residential construction. During the time that his license qualified Thomson Homes, Inc., Mr. Thomson believed that he and his wife owned the corporation equally and that she served as the president and he served as the vice-president. In the summer of 1998, Mr. Thomson filed for divorce from Ms. Thomson. In February 1999, Ms. Thomson fired Mr. Thomson from Thomson Homes, Inc. Shortly thereafter, Mr. Thomson learned that Ms. Thomson had caused all of the stock to be issued to her when the corporation was formed, and that she had assumed all of the officer and director positions. In early March 1999, Mr. Thomson cancelled all of the building permits that he had obtained on behalf of Thomson Homes, Inc., and withdrew his general contractor's license from Ms. Thomson's corporation, effective March 20, 1999. When Mr. Thomson withdrew his license from Thomson Homes, Inc., it was in the process of building or preparing to build about ten homes. At no time during Petitioner's discussions with Ms. Thomson was he aware that Thomson Homes, Inc., was actively involved in construction. Eventually, Ms. Thomson and Petitioner agreed that Petitioner would place his residential contractor's license with Thomson Homes, Inc., and would supervise the corporation's construction activities. In return, Thomson Homes, Inc., would pay Petitioner $500 weekly and 35 percent of the profits. After filing the necessary documentation in April 1999, Petitioner qualified Thomson Homes, Inc. effective April 22 or 26, 1999. Petitioner advised Ms. Thomson that he had other work to do for another month, so he could not start with Thomson Homes, Inc. immediately. Ms. Thomson told him that she had to get financing arranged for several signed contracts and did not have any construction taking place at the time. The record is unclear whether this delay took place after the initial agreement between Petitioner and Ms. Thomson or after Petitioner formally placed his license with Thomson Homes, Inc. However, in either event, from the date that Petitioner formally placed his license with Thomson Homes, Inc., he never had a substantive conversation with Ms. Thomson about any construction activities of Thomson Homes, Inc. Not hearing from Ms. Thomson, Petitioner eventually called her to learn when he would start work. At first, Ms. Thomson took Petitioner's calls and kept explaining that the financing paperwork had been delayed. She promised to call Petitioner when construction was ready to proceed. However, Ms. Thomson never contacted Petitioner, and she later stopped taking or returning Petitioner's calls. In early August 1999, Petitioner called Thomson Homes, Inc., and learned that its telephone had been disconnected. He visited the office of Thomson Homes, Inc., but found it closed and the premises vacated. In fact, Thomson Homes, Inc., discontinued business on or about August 1, 1999. Between the date that Petitioner had qualified Thomson Homes and the point at which Thomson Homes ceased doing business, Thomson Homes, Inc., had entered into construction contracts, taken deposits and draws on construction loans, and performed residential construction--all unknown to Petitioner. Also unknown to Petitioner was the fact that Thomson Homes, Inc., had failed to perform its obligations under many, if not all, of its construction contracts during that period. The record is unclear when Petitioner withdrew his license from Thomson Homes, Inc. Petitioner sent Respondent a letter on August 30, 1999, advising of the withdrawal of his license from Thomson Homes, Inc. Later advised that he needed to file another form to effect the withdrawal, Petitioner did so in March 2000. The difference is not important in these cases. At no time did Petitioner receive any money from Thomson Homes, Inc., or any of the claimants who contracted with Thomson Homes, Inc. At no time did Petitioner enter into any contracts with any of the claimants. Only after Thomson Homes, Inc., had taken the claimants' money and abandoned work or failed to commence work did Petitioner learn that Thomson Homes, Inc., had done construction business under his license. DOAH Case No. 03-3540 involves the claim of Sandra Harvey. Ms. Harvey entered into a construction agreement with Thomson Homes, Inc., on September 9, 1998. Pursuant to the agreement, Ms. Harvey agreed to pay Thomson Homes, Inc., $25,500 for a lot and $115,260 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After pouring the slab, constructing the shell, and completing the rough plumbing, air conditioning, and electrical, Thomson Homes, Inc., stopped work on Ms. Harvey's home in early 1999. Ms. Harvey learned of the problem when Mr. Thomson called her in early 1999 and said that he could not finish the home because Ms. Thomson had taken over the business. This call probably took place no later than late March 1999, when Mr. Thomas withdrew as the qualifier for Thomson Homes, Inc. The record does not reveal the extent of payments from Ms. Harvey or her lender or the extent of completed work at the time that Thomson Homes, Inc., abandoned the job. Although the complaint is not part of this record, Ms. Harvey commenced a legal action against Thomson Homes, Inc., but not Petitioner. She obtained a default final summary judgment against Thomson Homes, Inc., on March 30, 2001, for a total sum of $46,267.32, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant breached its contract by accepting Plaintiff's deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor, services and material provided. As a result of Defendant abandoning the project, Plaintiff was compelled to retain a new contractor to complete her home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, the misapplication of construction funds and financial mismanagement Plaintiff has been forced to borrow additional funds from the construction lender. On May 3, 2001, Ms. Harvey filed a claim with the Construction Industries Recovery Fund (Recovery Fund). In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Harvey answered "yes," explaining she had "filed lawsuit." Ms. Harvey probably filed her claim within two years of when Thomson Homes, Inc., abandoned her job. By the end of March 1999, Mr. Thomson informed Ms. Harvey that his wife had fired him, so he could not work on her home anymore. A change in qualifier does not mean that Thomson Homes, Inc., would necessarily abandon the job, but, as noted in the Conclusions of Law, abandonment presumptively arises upon the expiration of 90 days without work. No work took place on Ms. Harvey's home after Mr. Thomson withdrew as qualifier, so presumptive abandonment took place by the end of June 1999--after May 3, 1999, which is two years prior to the date on which Ms. Harvey filed her claim. By letter dated June 5, 2001, from James Brogan of WEI Consulting Group to Ms. Harvey, Mr. Brogan states that he had investigated the assets of Thomson Homes, Inc. Mr. Brogan found no bankruptcy filing by Thomson Homes, Inc., in Bankruptcy Court in the Southern District of Florida. Thomson Homes, Inc., was a party to 282 legal actions and owed tangible personal property taxes on furniture in a model home, but the furniture was no longer available. On February 28, 2003, Respondent issued an Order approving Ms. Harvey's claim of $25,000 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Harvey is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Harvey and Respondent, contests the payment to Ms. Harvey and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Harvey's claim because she had made insufficient efforts to satisfy the judgment; she had failed to submit all required exhibits with her claim; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Additionally, the petition contests the automatic suspension because the payment to Ms. Harvey is not authorized, her claim is incomplete, and her judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3541 involves the claim of John and Kathleen Whitesides. The Whitesides, who lived at the time in Juno Beach, Florida, entered into a construction contract with Thomson Homes, Inc., on February 7, 1999. Pursuant to the agreement, the Whitesides agreed to pay Thomson Homes, Inc., $154,094 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After the Whitesides paid Thomson Homes, Inc., $5000 and secured a construction loan, Thomson Homes, Inc., never commenced construction. In a complaint filed April 3, 2000, the Whitesides commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to any construction," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction. The Whitesides obtained a default final judgment against Thomson Homes, Inc., on December 21, 2000, for a total sum of $20,146.67, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: "Defendant is in breach of the Contract dated February 7, 1999, and has received unjust enrichment from Defendant's failure to fulfill the terms of the Contract to build a home for Plaintiffs." On August 9, 2001, David Tassell, the Whitesides' attorney in the circuit court action against Thomson Homes, Inc., stated, in an acknowledged statement, that he had performed "numerous" real property searches in Palm Beach and Martin counties' public records and determined that Thomas Homes, Inc., "owns no real property in Martin County." The omission of Palm Beach County in the statement is unexplained. Mr. Tassell's statement adds that he has retained a private investigator, who confirmed that Thomson Homes, Inc., owns no boats, planes, or automobiles. On August 10, 2001, the Whitesides filed a claim with the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Whitesides answered "yes," but did not supply an explanation in the following blank. The completed questionnaire accompanying the claim states that the Whitesides discovered the violation in September 1999 and that it occurred in July to August 1999. On September 17, 2002, Respondent issued an Order approving the Whitesides' claim of $18,526.67 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Whitesides are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. The Whitesides probably filed their claim within two years of when they reasonably should have discovered that Thomson Homes, Inc., had wrongfully failed to commence construction, as is required for reasons set forth in the Conclusions of Law. As noted in the Conclusions of Law, presumptive abandonment arose when Thomson Homes, Inc., after entering the contract, performed no work for 90 days. Six months elapsed from the signing of the contract to the date that is two years prior to the filing of the claim. Although the record is not well-developed on the point, it is more likely than not that due diligence did not require that the Whitesides discover the abandonment within the first 90 days after it had presumptively arisen. The Whitesides' judgment is probably based on a violation of Section 489.129(1)(g), (j), or (k), Florida Statutes, as is required for reasons set forth in the Conclusions of Law. Although the record is not well-developed on this point either, it is more likely than not that the judgment is based on Thomson Homes' abandonment after entering into the contract. The judgment does not state this basis explicitly, but the complaint, on which the judgment is based, alleges abandonment. On December 23, 2002, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Respondent and the Whitesides' attorney in the circuit court action against Thomson Homes, Inc., contests the payment to the Whitesides and the automatic suspension of Petitioner's license. The petition contests the payment of the Whitesides' claim because they did not file certified copies of the final judgment and levy and execution documents and their judgment did not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes. Additionally, the petition contests the automatic suspension because Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes; Petitioner received no notice of the hearing that resulted in the Order to pay the Whitesides and suspend Petitioner's license; the Whitesides' claim is incomplete; and the Whitesides' judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3542 involves the claim of Richard and Kathleen Beltz. The Beltzes entered into a construction contract with Thomson Homes, Inc., on July 13, 1999. Pursuant to the agreement, the Beltzes agreed to pay Thomson Homes, Inc., $35,500 for a lot and $140,500 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After the Beltzes paid Thomson Homes, Inc., $17,283.70, Thomson Homes, Inc., never appeared at the closing, which had been scheduled for August 10, 1999. Nor did Thomson Homes, Inc., ever commence construction. The record does not disclose the extent, if any, to which Thomson Homes, Inc., completed construction. The Beltzes' discovery of Thomson Homes' failure to commence construction was hampered by the fact that they resided in California at the time. However, the Beltzes had obviously discovered the wrongful acts and omissions of Thomson Homes, Inc., by September 29, 1999, when they sent a letter to Petitioner demanding that he return the money that they had paid Thomson Homes, Inc. On October 19, 1999, the Beltzes signed a claim under the Recovery Fund, but the record contains no indication when the claim was filed. The completed questionnaire attached to the claim does not ask if the claimants had made a diligent effort to collect payment from the contractor. For reasons set forth in the Conclusions of Law, a claim must follow a judgment, so, the Beltzes could not file a valid claim until they had obtained a judgment. Two years from September 29, 1999, at which point the Beltzes obviously knew of a violation, requires that they file the claim, on an already- secured judgment, prior to September 29, 2001. In a complaint filed February 4, 2002, the Beltzes commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to any construction" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Beltzes obtained a default final summary judgment against Thomson Homes, Inc., on May 22, 2002, for a total sum of $23,280.20, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant performed some work on the project. However, Defendant breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and material provided. As a result of Defendant failing to pay Lienors who provided labor, service and materials to Plaintiffs [sic] real property, Construction Liens were recorded against same, which Plaintiffs had to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay Lienors, the misapplication of construction funds and financial mismanagement, Plaintiffs were forced to borrow additional funds from their construction lender. By unacknowledged statement dated August 23, 2002, Ms. Beltz declared that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared that she had found on the internet two pieces of real property owned by Thomson Homes, Inc., but they had been transferred within the past year. Ms. Beltz stated that she searched the database of the "Department of Motor Vehicles in Palm Beach County" in May 2000 and found no vehicles or boats registered to Thomson Homes, Inc. Lastly, she reported that she contacted the "Federal Aviation Association" at an unspecified time and found no "airplanes" registered to Thomson Homes, Inc. On November 26, 2002, Respondent issued an Order approving the Beltzes' claim of $17,222.78 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Beltzes are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 27, 2002, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Beltzes and Respondent, contests the payment to the Beltzes and the automatic suspension of Petitioner's license. The petition contests the payment of the Beltzes' claim because they did not submit all of the necessary exhibits with their claim; their judgment is against Thomson Homes, Inc., and not Petitioner; and their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes. Additionally, the petition contests the automatic suspension because Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes; the Beltzes' claim is incomplete; and the Beltzes' judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3543 involves the claim of Keith and Karen Deyo. The Deyos entered into a construction contract with Thomson Homes, Inc., on October 31, 1998. Pursuant to the agreement, the Deyos agreed to pay Thomson Homes, Inc., $25,500 for a lot and $123,400 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. Although the Deyos clearly suffered damages from the acts and omissions of Thomson Homes, Inc., the record does not disclose how much they paid the company, how much they had to pay unpaid suppliers and laborers, and how much construction the company completed before abandoning the job. Thomson Homes, Inc., began construction on the Deyos' home about 30-45 days after the parties signed the contract, but all work stopped in July 1999. In an undated complaint, the Deyos commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment] of the project prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Deyos obtained a final summary judgment against Thomson Homes, Inc., on March 15, 2000, for a total sum of $55,458.64, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant partially performed work under the Contract. However, it breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and material provided. As a result of Defendant failing to pay lienors who provided labor, services and materials to Plaintiffs [sic] residence, construction liens were recorded against same, which Plaintiffs had to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 27, 2000, the Deyos signed a claim under the Recovery Fund, but the record contains no indication when the claim was filed. A cover letter dated May 8, 2000, suggests that the Deyos mailed their claim a couple of weeks after signing it, so it was probably filed in mid-May 2000, although their questionnaire bears a revision date of November 2001, which would be beyond two years after the violation. In the questionnaire, the Deyos did not respond to the question asking if they had made a diligent effort to collect payment from the contractor. By an undated and unacknowledged statement, Mr. Deyo declared that someone at the Florida Department of State advised him that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. He also declared that he had found on the internet two pieces of real property owned by Thomson Homes, Inc., but they had been transferred within the past year. Mr. Deyo stated that he searched the database of the "department of motor vehicles in Palm Beach County" in on April 14, 2000, and found no motor vehicles or boats registered to Thomson Homes, Inc. Lastly, he reported that he contacted the "Federal Aviation Association" on April 21, 2000, and found no "airplanes" registered to Thomson Homes, Inc. On January 22, 2003, Respondent issued an Order acknowledging the Deyos' claim of $55,458.64, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Mr. Deyo is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On February 3, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Respondent and the Deyos' attorney who represented them in the action against Thomson Homes, Inc., contests the payment to the Deyos and the automatic suspension of Petitioner's license. The petition contests the payment of the Deyos' claim and suspension of Petitioner's license because Petitioner did not receive notice of the hearing at which Respondent entered the Order; the Deyos did not satisfy all requirements for payment from the Recovery Fund; their claim was not accompanied by certified copies of the levy and execution documents; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3544 involves the claim of Sylvia Reinhardt. Ms. Reinhardt entered into a construction contract with Thomson Homes, Inc., on October 14, 1998. Pursuant to the agreement, Ms. Reinhardt agreed to pay Thomson Homes, Inc., $45,000 for a lot and $147,150 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After Ms. Reinhardt paid Thomson Homes, Inc., $144,769, directly and indirectly, by way of her construction lender, the house was little more than half complete when Thomson Homes, Inc., abandoned the job. Thomson Homes also failed to pay various suppliers that filed liens, so Ms. Reinhardt had to pay $8550.41 to RTS Roofing, $882 to Palm Beach Garage Door, and $3421.32 to Woodworks, Inc. In an undated complaint filed in 1999 (actual date illegible), Ms. Reinhardt commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiff's residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. Ms. Reinhardt obtained a final summary judgment against Thomson Homes, Inc., on March 28, 2000, for a total sum of $61,471.15, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant performed work under the Contract. However, it breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and materials provided. As a result of Defendant failing to pay lienors who provided labor, services and materials for the construction of Plaintiff's residence, construction liens were recorded against same, which Plaintiff had to satisfy. As a result of Defendant abandoning the project, Plaintiff was compelled to retain a new contractor to complete their [sic] home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiff has been forced to borrow additional funds from her construction lender. On April 17, 2000, Ms. Reinhardt filed a claim with the Recovery Fund. In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Reinhardt answered "yes" and explained: "Telephone calls were unanswered. Certified mail requesting response were [sic] never answered. Our attorney made written and personal contact with the owner and there was no intention to pay." The claim states that the violation took place in July 1999. By acknowledged statement dated July 21, 2000, Ms. Reinhardt declared that she had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy her judgment. Ms. Reinhardt stated that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared that she had found one parcel of property owned by Thomson Homes, Inc., and valued at $115,387, but this had been sold to "Joan Thomson" on February 1, 2000. Ms. Reinhardt stated that she had found tangible personal property worth $5000. She added that she had not found any motor vehicles registered with the Department of Highway Safety and Motor Vehicles, nor had she found anything registered with the "FAA." On November 26, 2002, Respondent issued an Order acknowledging Ms. Reinhardt's claim of $58,661.44, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Reinhardt is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 24, 2002, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Reinhardt and Respondent, contests the payment to Ms. Reinhardt and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Reinhardt's claim and suspension of Petitioner's license because Ms. Reinhardt did not submit certified copies of the levy and execution documents; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3545 involves the claim of Louis and Ann Mahoney. The Mahoneys entered into a construction contract with Thomson Homes, Inc., on June 28, 1999, for the construction of a home in Martin County. Pursuant to the agreement, the Mahoneys agreed to pay Thomson Homes, Inc., $32,000 for a lot and $149,000 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 150 days from the date of slab pour. After the Mahoneys paid Thomson Homes, Inc., $14,500, directly and indirectly, by way of their construction lender, they suffered damages due to the acts and omissions of Thomson Homes, Inc., although, again, the record does not describe specifically how Thomson Homes caused them damage. In an undated complaint that bears no filing date, the Mahoneys commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Mahoneys obtained a final summary judgment against Thomson Homes, Inc., on April 13, 2000, for a total sum of $43,084.49, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant breached its contract by accepting Plaintiffs' deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor, and/or services provided. As a result of Defendant failing to pay lienor's [sic] who provided labor, services and materials for the construction of Plaintiffs [sic] residence, a construction lien was recorded against Plaintiffs' property, which Plaintiffs will have to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 30, 2000, the Mahoneys signed a claim under the Recovery Fund. Although the claim form bears no filing date, the completed questionnaire attached to the claim was filed on May 3, 2000, so that is the likely filing date of the claim. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Mahoneys answered "yes" and explained: "This is explained in General Allegations, enclosed with this paperwork." Evidently, the reference is to a copy of the circuit court complaint. By acknowledged statement dated April 8, 2002, Mr. Mahoney declared that he had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy his judgment. Mr. Mahoney stated that someone at the Florida Department of State advised him that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. He also declared that an internet search had disclosed no property owned by Thomson Homes, Inc. Mr. Mahoney stated that the "department of motor vehicles in Palm Beach County" found no motor vehicles or boats registered to Thomson Homes, Inc., and that the "FAA" had found nothing registered to Thomson Homes, Inc. On February 28, 2003, Respondent issued an Order acknowledging the Mahoneys' claim of $38,185, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Mr. Mahoney is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Mahoneys and Respondent, contests the payment to the Mahoneys and the automatic suspension of Petitioner's license. The petition contests the payment of the Mahoneys' claim and suspension of Petitioner's license because they did not submit all of the required exhibits; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3546 involves the claim of Dennis and Carolyn DeStefanis. The DeStefanises entered into a construction contract with Thomson Homes, Inc., on April 7, 1999. Pursuant to the agreement, the DeStefanises agreed to pay Thomson Homes, Inc., $137,455 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 150 days from the date of slab pour. After the DeStefanises paid Thomson Homes, Inc., $15,765, directly and indirectly, by way of their construction lender, Thomson Homes, Inc. never did any work, except to contract with a surveyor, who, unpaid, filed a claim of lien against the DeStefanises's lot. In an undated complaint bearing no filing date, the DeStefanises commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The DeStefanises obtained a final summary judgment against Thomson Homes, Inc., on March 15, 2000, for a total sum of $36,701.87, including attorneys' fees and costs. The judgment states, in part: Subsequent to entering . . . into the above referenced contract, Defendant, [sic] breached its contract by accepting Plaintiffs [sic] deposits and construction loan disbursements and thereafter abandoning the project. [sic] As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 19, 2000, the DeStefanises filed a claim with the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the DeStefanises answered "yes" and explained: "Went to DBPR Investigative Services, hired Attorney Barry W. Taylor [attorney in circuit court action], got Final Summary Judgment against Thomson Homes, Inc." On March 20, 2003, Respondent issued an Order acknowledging the DeStefanises' claim of $34,965.52, approving the payment of $15,765 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the DeStefanises are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On April 7, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the DeStefanises and Respondent, contests the payment to the DeStefanises and the automatic suspension of Petitioner's license. The petition contests the payment of the DeStefanises' claim and suspension of Petitioner's license because they did not submit all of the required exhibits; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. The petition contests the suspension of Petitioner's license on the additional ground that he was not the qualifier for Thomson Homes, Inc., when it and the DeStefanises entered into the construction contract. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3547 involves the claim of James and Donna Barr. The Barrs entered into a construction contract with Thomson Homes, Inc., on September 12, 1998. Pursuant to the agreement, the Barrs agreed to pay Thomson Homes, Inc., $30,000 for a lot and $140,900 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. The Barrs paid Thomson Homes, Inc., $8500 in the form of a down payment. They or their construction lender paid Thomson Homes, Inc., considerably more money and suffered the imposition of claims of lien by unpaid subcontractors and suppliers, but, after negotiating with the bank, emerged from the transaction having lost only the $8500 down payment. Thomson Homes, Inc., obtained permits in April 1999 and started construction in May 1999. Before abandoning the job, Thomson Homes, Inc., worked on the home in May, June, and July of 1999. The Barrs and their lender did not make additional payments after the Barrs found the Thomson Homes, Inc., office empty on August 1, 1999. In a complaint filed October 6, 1999, the Barrs commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Barrs obtained a final summary judgment against Thomson Homes, Inc., on May 8, 2000, for a total sum of $45,435.62, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, partially performed work under the Contract. However, Defendant breached the contract by accepting Plaintiffs [sic] deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor services and materials provided. As a result of Defendant failing to pay lienors who provided labor, services and materials for the construction of Plaintiffs [sic] residence, construction liens were recorded against same, which Plaintiffs will have to satisfy. As a result of Defendant abandoning the project, Plaintiffs will be compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienors, the misapplication of construction funds and financial mismanagement Plaintiffs will be forced to borrow additional funds from their construction lender. On June 2, 2000, the Barrs filed a claim under the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Barrs answered "yes" and explained: "I have looked into the assets of Thomson Homes Inc. and they do not have any. My affidavit is attached." The completed questionnaire states that the Barrs discovered the violation on August 11, 1999. They therefore failed to file their claim within two years of the discovery of the violation. By acknowledged statement dated May 23, 2000, Ms. Barr declared that she had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy her judgment. Ms. Barr stated that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared she had found no property owned by Thomson Homes, Inc., in Palm Beach County. Ms. Barr stated that the Department of Highway Safety and Motor Vehicles found no motor vehicles or boats registered to Thomson Homes, Inc., and that the internet site of the "FAA" had revealed nothing registered to Thomson Homes, Inc. On November 26, 2002, Respondent issued an Order approving the payment of the Barrs' claim of $8500 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Barrs are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 27, 2002, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Barrs and Respondent, contests the payment to the Barrs and the automatic suspension of Petitioner's license. The petition contests the payment of the Barrs' claim and suspension of Petitioner's license because they did not submit a certified copy of the levy and execution documents; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3633 involves the Joanne Myers. Ms. Myers entered into a construction contract with Thomson Homes, Inc., on February 7, 1999. Pursuant to the agreement, Ms. Myers agreed to pay Thomson Homes, Inc., $29,500 for a lot and $125,400 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. Ms. Myers directly or indirectly paid Thomson Homes, Inc., $12,840. According to Ms. Myers' claim, Thomson Homes, Inc., never commenced construction before going out of business in August 1999. In an undated complaint bearing no filing date, Ms. Myers commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiff's residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. Ms. Myers obtained a final summary judgment against Thomson Homes, Inc., on May 31, 2000, for a total sum of $28,307.77, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering . . . into the above referenced contract, Defendant breached the contract by accepting Plaintiff's deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor services and materials provided. As a result of Defendant failing to pay lienor's [sic] who provided labor, services and/or materials for the construction of Plaintiff's residence, construction liens were recorded against same, which Plaintiff will have to satisfy. As a result of Defendant abandoning the project, Plaintiff will be compelled to retain a new contractor to complete her home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiff will be forced to borrow additional funds from her construction lender. On September 18, 2000, Ms. Myers filed a claim with the Recovery Fund. In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Myers answered "yes" and explained: "Contractor closed corporate office--would not answer telephone calls." By letter dated November 30, 2000, from James Brogan of WEI Consulting Group to Ms. Myers, Mr. Brogan states that he had investigated the assets of Thomson Homes, Inc. Mr. Brogan found no bankruptcy filing by Thomson Homes, Inc., in the Southern District of Florida. Thomson Homes, Inc., was a party to 282 legal actions and owed tangible personal property taxes on furniture in a model home. On February 28, 2003, Respondent issued an Order approving the payment of Ms. Myers' claim of $14,080.66 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Myers is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Myers and Respondent, contests the payment to Ms. Myers and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Myers' claim and suspension of Petitioner's license because she did not submit evidence of a diligent search for assets; she did not submit all of the required exhibits; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. On January 4, 2004, Ms. Myers died. However, the probate court of Lancaster County, Pennsylvania, issued letters testamentary on her estate to James W. Myers III, in whose name Ms. Myers' claim is now being prosecuted. At the hearing, Petitioner contended that most, if not all, of the claims failed because the claimants had not exercised reasonable diligence in searching for assets, although Petitioner has dropped this contention in its proposed recommended order. In his petitions for hearing, Petitioner raised this contention only as to Ms. Myers. Ms. Myers, as well as the remainder of the claimants, made or caused to be made a reasonable search and inquiry for the assets of Thomson Homes, Inc. It is obvious that Thomson Homes, Inc., had no assets by the first letter from Mr. Brogan, dated November 30, 2000, nor did it have assets when Mr. Brogan issued his later letter on June 5, 2001, or when the attorney issued his affidavit on August 9, 2001. What is reasonable, in terms of a search, is dictated here by the fact that Thomson Homes, Inc., had no discoverable assets against which it could be made to answer for the considerable fraud that it perpetrated against these nine claimants. Respondent provided all of the parties, including Petitioner, with notice of its hearings at which it entered Recovery Fund orders. The petitions contend that Petitioner received no such notice in the Whitesides and Deyos cases. Although not litigated at the hearing, the presumption of notice, pursuant to the recitations set forth in each of Respondent's orders, results in a finding that Petitioner received timely notice in all cases.

Recommendation It is RECOMMENDED that Respondent enter a final order dismissing the claims against the Recovery Fund of the Beltzes and Barrs; paying the claims against the Recovery Fund of the remaining claimants, pursuant to the provisions of the orders of Respondent already issued in these cases and pursuant to the provisions of Section 489.143(1)-(6), Florida Statutes; and dismissing Respondent's request for the automatic suspension of Petitioner's license, pursuant to Section 489.143(7), Florida Statutes, without prejudice to any separate disciplinary proceedings that Respondent has commenced or may commence against Petitioner or others for the acts and omissions involved in these nine cases. DONE AND ENTERED this 17th day of February, 2004, in Tallahassee, Leon County, Florida. S ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of February, 2004. COPIES FURNISHED: Bruce G. Kaleita Law Office of Bruce G. Kaleita, P.A. 1615 Forum Place, Suite 500 West Palm Beach, Florida 33401 Adrienne C. Rodgers Assistant General Counsel Department of Business and Professional Regulation 1940 North Monroe Street, Suite 60 Tallahassee, Florida 32399-1023 Tim Vaccaro, Director Construction Industry Licensing Board Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 Nancy Campiglia, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202

Florida Laws (10) 120.569120.57468.631489.1195489.129489.132489.140489.141489.14357.111
# 3
WORLDWIDE INVESTMENT GROUP, INC. (SAV-A-STOP, INC.) vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 97-001498 (1997)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Mar. 27, 1997 Number: 97-001498 Latest Update: Apr. 02, 1999

The Issue Is Worldwide Investment Group, Inc. (Worldwide) entitled to apply to the State of Florida, Department of Environmental Protection (the Department) for funds to reimburse Worldwide for costs associated with petroleum clean-up at 500 Wells Road, Orange Park, Florida, Facility ID#108736319? See Section 376.3071(12), Florida Statutes.

Findings Of Fact The Property Howard A. Steinberg is a Certified Public Accountant, (CPA) licensed to practice in Florida. In addition to his work as a CPA, Mr. Steinberg has other business interests. Among those interests is Worldwide, a corporation which Mr. Steinberg formed for the purpose of acquiring certain assets, or properties, from Home Savings Bank and American Homes Service Corporation (Home Savings Bank). Worldwide became a corporation in July 1996. Mr. Steinberg is the sole shareholder of that corporation and has been since the inception of the corporation. In addition to controlling all of the assets within Worldwide, Mr. Steinberg is the sole officer of the corporation. The corporation has no other employees. Worldwide has its office in Hollywood, Florida, in the same physical location as Mr. Steinberg's accounting firm of Keystone, Steinberg and Company, C.P.A. Under its arrangement with Home Savings Bank, Worldwide acquired property known as Save-A-Stop at 500 Wells Road, Orange Park, Florida. Mr. Steinberg engaged the law firm of Burnstein and Knee, to assist Worldwide in the purchase of the Save-A-Stop property. The Save-A-Stop property is a commercial parcel that has experienced environmental contamination from petroleum products. To address that problem the firm of M. P. Brown & Associates, Inc., (Brown) was paid for services in rendering environmental clean-up of that site. Substantial work had been done by Brown to remediate the contamination before Worldwide purchased the property from Home Savings Bank. Home Savings had paid Brown for part of the costs of clean-up before Worldwide acquired the Save- A-Stop property. After the purchase, Mr. Steinberg paid Brown to finish the clean-up. Application for Reimbursement Mr. Steinberg, as owner of Worldwide, understood that the possibility existed that Worldwide could be reimbursed for some of the clean-up costs by resorting to funds available from the Department. On July 29, 1997, Bonnie J. Novak, P.G., Senior Environmental Geologist for Brown, wrote to Mr. Steinberg to provide a cost estimate for preparing a reimbursement application in relation to the Save-A-Stop property. The cost to prepare the application was $1,870.00. On August 27, 1996, Mr. Steinberg accepted the offer that had been executed by Brown by Mr. Steinberg signing a contract, and by calling for Brown to prepare an application, to be presented to the Department for reimbursement of costs expended in the clean-up. In furtherance of the agreement between Worldwide and Brown, $935.00 was paid as part of the costs of preparation of the application. This payment was by a check mailed on August 27, 1996. The balance of the fee was to be paid upon the completion of the preparation of the application. In 1996, outside the experience of his businesses, Mr. Steinberg was having difficulties in his marriage. To address the situation, Mr. Steinberg filed a Petition for Dissolution of Marriage. That Petition was filed in April 1996, at which time Mr. Steinberg assumed custody of the children of that marriage, with no right for their mother to unaccompanied visits. After filing for dissolution, Mr. Steinberg relied on others to assist him in dealing with his personal and business life. From December 1996 through January 6, 1997, Mr. Steinberg was particularly influenced by the upheaval in his personal life. It caused him to request extension of deadlines from the Internal Revenue Service for the benefit of his clients whom he served as a CPA. During December, Mr. Steinberg was only in his office for approximately 10 percent of the normal time he would have spent had conditions in his personal life been more serene. On January 6, 1997, the conditions in Mr. Steinberg's personal life took a turn for the worse when his wife committed suicide. In December 1996, attorney Jerrold Knee, who had assisted Mr. Steinberg as counsel in purchasing the Save-A-Stop property, spoke to someone at Brown concerning the status of the preparation of the application for reimbursement of funds expended in the clean-up. He was told that the application was being worked on. Mr. Knee was aware that the deadline for filing the application was December 31, 1996. Mr. Steinberg was also aware of the December 31, 1996, deadline for submitting the application. In that connection, Mr. Knee was familiar with the difficulties that Mr. Steinberg was having in Mr. Steinberg's marriage in 1996. Mr. Knee knew that Mr. Steinberg was infrequently in the office attending to business. Mr. Knee surmised that Mr. Steinberg was relying upon Mr. Knee to make certain that the application was timely submitted, and Mr. Knee felt personally obligated to assist Mr. Steinberg in filing the application, given the knowledge that Mr. Steinberg was not in the office routinely during December 1996. His sense of responsibility did not rise to the level of a legal obligation between lawyer and client. Although Mr. Knee was aware of the pending deadline for submitting the application for reimbursement, and had inquired about its preparation by Brown, and had discussed it with Mr. Steinberg, Mr. Knee never specifically committed to making certain that the reimbursement application was filed on time. As it had committed to do, Brown prepared the reimbursement application for the Save-A-Stop site. The application was for the total amount of $58,632.85, not including preparation charges and CPA Fees. Written notification of the preparation of the application was provided to Mr. Steinberg on December 12, 1996. The correspondence reminded Mr. Steinberg that the application needed CPA approval, an invoice and registration, and a signed certification affidavit. Most importantly, the notification reminded Mr. Steinberg that an original and two copies of the application must be sent to a person within the Department prior to December 31, 1996. The notification specifically indicated the name of that individual within the Department and set forth that person's address. The notification arrived in Mr. Steinberg's office during the week of December 12, 1996. That notification was not opened until late January or early February 1997. Mr. Steinberg opened the letter at that time. During December 1996 Mr. Steinberg was responsible for opening the mail received in his office. No other person was expected to open that mail for the benefit of Worldwide. Untimely Application On February 6, 1997, Worldwide submitted its application for reimbursement for clean-up at the Save-A-Stop location. That application was received by the Department on February 7, 1997. The Department has consistently interpreted the statutory deadline for submitting reimbursement applications in accordance with Section 376.3071(12), Florida Statutes, (Supp. 1996) to be absolute. Consequently, on February 11, 1997, the Department denied the Worldwide application because it had been filed beyond the December 31, 1996, deadline recognized by the statute. Worldwide contested that proposed agency action by requesting a hearing to examine the issue of the timing of the application submission. Consequences of Untimely Application In Florida, petroleum taxes are deposited for the benefit of the Inland Protection Trust Fund. The Florida Legislature allows monies to be appropriated from those deposited funds. In that budgetary process, the Governor's office serves as liaison in requesting the Legislature to appropriate monies from the Inland Protection Trust Fund in relation to the costs of cleanup of sites contaminated by petroleum products. To assist the Governor's office, the Department identifies the need for covering the costs of the clean-up and makes a recommendation to the Governor to provide to the Legislature concerning the amount to be appropriated for the clean-up. In the history of the clean-up program, in 1995, problems were experienced with fraudulent and inflated claims calling for reimbursement for the cost of clean-up. This led to a debt of approximately $550,000,000.00. There was a concern that that debt could not be repaid in a reasonable time frame. In response, the Department, as authorized by the Legislature in action taken in 1996, negotiated a bond transaction through the Inland Protection Financing Corporation. With the advent of the bond issue, $343,000,000.00, not to include the cost of funding the bond, was made available to pay for petroleum clean-up. That bond issue was designed to fund the payment of reimbursement applications that had been received before the end of the life of the petroleum clean-up reimbursement program in place. During the 1996 session, in which the Legislature approved the bond issue, the Legislature also made changes to the petroleum clean-up program. The changes were fundamental in that applicants were no longer reimbursed for clean-up work that had been performed. With the advent of the legislative changes, petroleum clean-up, under a system calling for payment from the fund, could only be conducted if an applicant was pre-approved to conduct the clean- up. As part of that process of gaining funds pursuant to the bond issue, the Department performed an analysis, as authorized by the Legislature, to determine that amount necessary to pay existing obligations that had accrued under the petroleum clean-up reimbursement program that predated the Legislative change in 1996. To ascertain the existing obligation, the Department totaled the known dollar amount associated with the existing reimbursement applications and a portion of unreviewed reimbursement applications that had been received. The Department adjusted the sum to be paid in association with applications that had not been reviewed to that point, having in mind prior experience in which only 82 percent of claims had been allowed. The overriding concern by the Department was that it needed to determine whether the bond issue would be sufficient to defease the backlog of applications for reimbursement previously filed. Information concerning the reimbursement obligations was made known to the Florida Supreme Court in bond validation proceedings held before that court. The Inland Protection Finance Corporation was also made aware of the reimbursement obligations. In 1997, the Department gave further information to the Inland Protection Financing Corporation, indicating that the amount of bond was sufficient for reimbursement obligations. The Department in association with the terms of the bond transaction agreed that the bond proceeds would not be used to fund claims that were received after January 3, 1997. The deadline for submitting applications had been extended until January 3, 1997, by virtue of a statutory amendment found at Section 376.3071(12), Florida Statutes, (1997). Therefore, consistent with the statutory change, the Department had allowed applications submitted after December 31, 1996, but before January 4, 1997, to be considered on their merits. The December 31, 1996, deadline had existed under Section 376.3071(12), Florida Statutes (Supp. 1996). The statutory change occurred because a number of applications that were filed pursuant to the December 31, 1996, deadline set forth in Section 376.3071(12), Florida Statutes (Supp. 1996) did not meet that deadline. The reason for this failure was due to weather conditions that caused overnight couriers, Federal Express and United Parcel Service, to be unable to deliver parcels to the Tallahassee, Florida, airport. These applications, as other applications, were sent to the Department at a Tallahassee, Florida, address. Based on the inability of the two couriers to deliver applications under the timeline anticipated, the Department did not receive that group of applications until January 2, 1997. Subsequently, the applications were accepted as timely based upon the amendment found in Section 376.371(12), Florida Statutes (1997) which extended the filing deadline until January 3, 1997. As a policy consideration, the Department believes it must strictly enforce the deadline for submission of reimbursement applications, as extended by the Legislature, to avoid the future accrual of debt for applications submitted after January 3, 1997, which the Department cannot reasonably anticipate. Apropos of the present case, the Department does not believe that it is well-advised to allow even a single claim for reimbursement, if that claim was received after January 3, 1997. To date, 64 applications have been received by the Department subsequent to December 31, 1996. All but six of those applications were received no later than January 3, 1997. Two of that six applications for reimbursement are still pending before the Department. Historically 22,000 applications for petroleum clean-up have been received by the Department since 1986. At the time of the hearing, 9,000 applications were pending before the Department. In December 1996, 3,000 applications were received calling for reimbursement of costs. At the time of hearing, approximately $340,000,000 in reimbursement claims had not been satisfied. Petitioner makes its claim to be excepted from the deadline for submitting its application based upon the doctrine of equitable tolling.

Recommendation Upon consideration of the facts found and the conclusions of law reached, it is, RECOMMENDED that a Final Order be entered denying the application of Worldwide to participate in the reimbursement program for clean-up expenses as untimely. DONE AND ENTERED this 7th day of May, 1998, in Tallahassee, Leon County, Florida. CHARLES C. ADAMS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 7th day of May, 1998. COPIES FURNISHED: P. Tim Howard, Esquire P. Tim Howard and Associates, P.A. 1424 East Piedmont Drive, Suite 202 Tallahassee, Florida 32312 Jeffrey Brown, Esquire Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 F. Perry Odom, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Virginia B. Wetherell, Secretary Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (3) 120.569120.57376.3071
# 5
LARRY E. SHIMKUS vs DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD, 03-003547 (2003)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 26, 2003 Number: 03-003547 Latest Update: Sep. 15, 2005

The Issue The issues in each case are whether, pursuant to Sections 489.141 and 489.143, Florida Statutes (2003), a claimant is entitled to payment from the Construction Industries Recovery Fund, and, if so, whether, pursuant to Section 489.143(7), Florida Statutes (2003), Respondent may automatically suspend the residential contractor's license of Petitioner until Petitioner reimburses Respondent for the paid claim.

Findings Of Fact Petitioner is licensed as a certified residential contractor, holding license number CRC 013599. Respondent first issued a residential contractor's license to Petitioner in 1978, and Petitioner has been continually licensed since that time. Petitioner has never been disciplined by Respondent or any local governmental agency. On January 29, 2004, Respondent transmitted to the Division of Administrative Hearings seven files containing administrative complaints alleging disciplinary breaches against Petitioner for many of the transactions covered in the nine subject cases. These seven new cases have not yet been heard, and Respondent has not yet entered any restitution orders against Petitioner. In the past, Petitioner has placed his residential contractor's license with various corporations to qualify them to perform residential construction. In February 1999, Petitioner met with Lori Thomson, president of Thomson Homes, Inc., to discuss placing his license with her residential construction company. Now inactive, Thomson Homes, Inc., had been in the residential construction business since at least 1994, operating out of an office in Palm Beach County, which is also the location of all but one of the residential construction jobs that are the subject of these cases. Since 1994, Thomson Homes, Inc., had used the general contractor's license of Ms. Thomson's husband, Steven Thomson, to qualify to perform residential construction. During the time that his license qualified Thomson Homes, Inc., Mr. Thomson believed that he and his wife owned the corporation equally and that she served as the president and he served as the vice-president. In the summer of 1998, Mr. Thomson filed for divorce from Ms. Thomson. In February 1999, Ms. Thomson fired Mr. Thomson from Thomson Homes, Inc. Shortly thereafter, Mr. Thomson learned that Ms. Thomson had caused all of the stock to be issued to her when the corporation was formed, and that she had assumed all of the officer and director positions. In early March 1999, Mr. Thomson cancelled all of the building permits that he had obtained on behalf of Thomson Homes, Inc., and withdrew his general contractor's license from Ms. Thomson's corporation, effective March 20, 1999. When Mr. Thomson withdrew his license from Thomson Homes, Inc., it was in the process of building or preparing to build about ten homes. At no time during Petitioner's discussions with Ms. Thomson was he aware that Thomson Homes, Inc., was actively involved in construction. Eventually, Ms. Thomson and Petitioner agreed that Petitioner would place his residential contractor's license with Thomson Homes, Inc., and would supervise the corporation's construction activities. In return, Thomson Homes, Inc., would pay Petitioner $500 weekly and 35 percent of the profits. After filing the necessary documentation in April 1999, Petitioner qualified Thomson Homes, Inc. effective April 22 or 26, 1999. Petitioner advised Ms. Thomson that he had other work to do for another month, so he could not start with Thomson Homes, Inc. immediately. Ms. Thomson told him that she had to get financing arranged for several signed contracts and did not have any construction taking place at the time. The record is unclear whether this delay took place after the initial agreement between Petitioner and Ms. Thomson or after Petitioner formally placed his license with Thomson Homes, Inc. However, in either event, from the date that Petitioner formally placed his license with Thomson Homes, Inc., he never had a substantive conversation with Ms. Thomson about any construction activities of Thomson Homes, Inc. Not hearing from Ms. Thomson, Petitioner eventually called her to learn when he would start work. At first, Ms. Thomson took Petitioner's calls and kept explaining that the financing paperwork had been delayed. She promised to call Petitioner when construction was ready to proceed. However, Ms. Thomson never contacted Petitioner, and she later stopped taking or returning Petitioner's calls. In early August 1999, Petitioner called Thomson Homes, Inc., and learned that its telephone had been disconnected. He visited the office of Thomson Homes, Inc., but found it closed and the premises vacated. In fact, Thomson Homes, Inc., discontinued business on or about August 1, 1999. Between the date that Petitioner had qualified Thomson Homes and the point at which Thomson Homes ceased doing business, Thomson Homes, Inc., had entered into construction contracts, taken deposits and draws on construction loans, and performed residential construction--all unknown to Petitioner. Also unknown to Petitioner was the fact that Thomson Homes, Inc., had failed to perform its obligations under many, if not all, of its construction contracts during that period. The record is unclear when Petitioner withdrew his license from Thomson Homes, Inc. Petitioner sent Respondent a letter on August 30, 1999, advising of the withdrawal of his license from Thomson Homes, Inc. Later advised that he needed to file another form to effect the withdrawal, Petitioner did so in March 2000. The difference is not important in these cases. At no time did Petitioner receive any money from Thomson Homes, Inc., or any of the claimants who contracted with Thomson Homes, Inc. At no time did Petitioner enter into any contracts with any of the claimants. Only after Thomson Homes, Inc., had taken the claimants' money and abandoned work or failed to commence work did Petitioner learn that Thomson Homes, Inc., had done construction business under his license. DOAH Case No. 03-3540 involves the claim of Sandra Harvey. Ms. Harvey entered into a construction agreement with Thomson Homes, Inc., on September 9, 1998. Pursuant to the agreement, Ms. Harvey agreed to pay Thomson Homes, Inc., $25,500 for a lot and $115,260 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After pouring the slab, constructing the shell, and completing the rough plumbing, air conditioning, and electrical, Thomson Homes, Inc., stopped work on Ms. Harvey's home in early 1999. Ms. Harvey learned of the problem when Mr. Thomson called her in early 1999 and said that he could not finish the home because Ms. Thomson had taken over the business. This call probably took place no later than late March 1999, when Mr. Thomas withdrew as the qualifier for Thomson Homes, Inc. The record does not reveal the extent of payments from Ms. Harvey or her lender or the extent of completed work at the time that Thomson Homes, Inc., abandoned the job. Although the complaint is not part of this record, Ms. Harvey commenced a legal action against Thomson Homes, Inc., but not Petitioner. She obtained a default final summary judgment against Thomson Homes, Inc., on March 30, 2001, for a total sum of $46,267.32, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant breached its contract by accepting Plaintiff's deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor, services and material provided. As a result of Defendant abandoning the project, Plaintiff was compelled to retain a new contractor to complete her home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, the misapplication of construction funds and financial mismanagement Plaintiff has been forced to borrow additional funds from the construction lender. On May 3, 2001, Ms. Harvey filed a claim with the Construction Industries Recovery Fund (Recovery Fund). In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Harvey answered "yes," explaining she had "filed lawsuit." Ms. Harvey probably filed her claim within two years of when Thomson Homes, Inc., abandoned her job. By the end of March 1999, Mr. Thomson informed Ms. Harvey that his wife had fired him, so he could not work on her home anymore. A change in qualifier does not mean that Thomson Homes, Inc., would necessarily abandon the job, but, as noted in the Conclusions of Law, abandonment presumptively arises upon the expiration of 90 days without work. No work took place on Ms. Harvey's home after Mr. Thomson withdrew as qualifier, so presumptive abandonment took place by the end of June 1999--after May 3, 1999, which is two years prior to the date on which Ms. Harvey filed her claim. By letter dated June 5, 2001, from James Brogan of WEI Consulting Group to Ms. Harvey, Mr. Brogan states that he had investigated the assets of Thomson Homes, Inc. Mr. Brogan found no bankruptcy filing by Thomson Homes, Inc., in Bankruptcy Court in the Southern District of Florida. Thomson Homes, Inc., was a party to 282 legal actions and owed tangible personal property taxes on furniture in a model home, but the furniture was no longer available. On February 28, 2003, Respondent issued an Order approving Ms. Harvey's claim of $25,000 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Harvey is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Harvey and Respondent, contests the payment to Ms. Harvey and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Harvey's claim because she had made insufficient efforts to satisfy the judgment; she had failed to submit all required exhibits with her claim; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Additionally, the petition contests the automatic suspension because the payment to Ms. Harvey is not authorized, her claim is incomplete, and her judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3541 involves the claim of John and Kathleen Whitesides. The Whitesides, who lived at the time in Juno Beach, Florida, entered into a construction contract with Thomson Homes, Inc., on February 7, 1999. Pursuant to the agreement, the Whitesides agreed to pay Thomson Homes, Inc., $154,094 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After the Whitesides paid Thomson Homes, Inc., $5000 and secured a construction loan, Thomson Homes, Inc., never commenced construction. In a complaint filed April 3, 2000, the Whitesides commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to any construction," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction. The Whitesides obtained a default final judgment against Thomson Homes, Inc., on December 21, 2000, for a total sum of $20,146.67, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: "Defendant is in breach of the Contract dated February 7, 1999, and has received unjust enrichment from Defendant's failure to fulfill the terms of the Contract to build a home for Plaintiffs." On August 9, 2001, David Tassell, the Whitesides' attorney in the circuit court action against Thomson Homes, Inc., stated, in an acknowledged statement, that he had performed "numerous" real property searches in Palm Beach and Martin counties' public records and determined that Thomas Homes, Inc., "owns no real property in Martin County." The omission of Palm Beach County in the statement is unexplained. Mr. Tassell's statement adds that he has retained a private investigator, who confirmed that Thomson Homes, Inc., owns no boats, planes, or automobiles. On August 10, 2001, the Whitesides filed a claim with the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Whitesides answered "yes," but did not supply an explanation in the following blank. The completed questionnaire accompanying the claim states that the Whitesides discovered the violation in September 1999 and that it occurred in July to August 1999. On September 17, 2002, Respondent issued an Order approving the Whitesides' claim of $18,526.67 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Whitesides are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. The Whitesides probably filed their claim within two years of when they reasonably should have discovered that Thomson Homes, Inc., had wrongfully failed to commence construction, as is required for reasons set forth in the Conclusions of Law. As noted in the Conclusions of Law, presumptive abandonment arose when Thomson Homes, Inc., after entering the contract, performed no work for 90 days. Six months elapsed from the signing of the contract to the date that is two years prior to the filing of the claim. Although the record is not well-developed on the point, it is more likely than not that due diligence did not require that the Whitesides discover the abandonment within the first 90 days after it had presumptively arisen. The Whitesides' judgment is probably based on a violation of Section 489.129(1)(g), (j), or (k), Florida Statutes, as is required for reasons set forth in the Conclusions of Law. Although the record is not well-developed on this point either, it is more likely than not that the judgment is based on Thomson Homes' abandonment after entering into the contract. The judgment does not state this basis explicitly, but the complaint, on which the judgment is based, alleges abandonment. On December 23, 2002, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Respondent and the Whitesides' attorney in the circuit court action against Thomson Homes, Inc., contests the payment to the Whitesides and the automatic suspension of Petitioner's license. The petition contests the payment of the Whitesides' claim because they did not file certified copies of the final judgment and levy and execution documents and their judgment did not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes. Additionally, the petition contests the automatic suspension because Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes; Petitioner received no notice of the hearing that resulted in the Order to pay the Whitesides and suspend Petitioner's license; the Whitesides' claim is incomplete; and the Whitesides' judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3542 involves the claim of Richard and Kathleen Beltz. The Beltzes entered into a construction contract with Thomson Homes, Inc., on July 13, 1999. Pursuant to the agreement, the Beltzes agreed to pay Thomson Homes, Inc., $35,500 for a lot and $140,500 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After the Beltzes paid Thomson Homes, Inc., $17,283.70, Thomson Homes, Inc., never appeared at the closing, which had been scheduled for August 10, 1999. Nor did Thomson Homes, Inc., ever commence construction. The record does not disclose the extent, if any, to which Thomson Homes, Inc., completed construction. The Beltzes' discovery of Thomson Homes' failure to commence construction was hampered by the fact that they resided in California at the time. However, the Beltzes had obviously discovered the wrongful acts and omissions of Thomson Homes, Inc., by September 29, 1999, when they sent a letter to Petitioner demanding that he return the money that they had paid Thomson Homes, Inc. On October 19, 1999, the Beltzes signed a claim under the Recovery Fund, but the record contains no indication when the claim was filed. The completed questionnaire attached to the claim does not ask if the claimants had made a diligent effort to collect payment from the contractor. For reasons set forth in the Conclusions of Law, a claim must follow a judgment, so, the Beltzes could not file a valid claim until they had obtained a judgment. Two years from September 29, 1999, at which point the Beltzes obviously knew of a violation, requires that they file the claim, on an already- secured judgment, prior to September 29, 2001. In a complaint filed February 4, 2002, the Beltzes commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to any construction" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Beltzes obtained a default final summary judgment against Thomson Homes, Inc., on May 22, 2002, for a total sum of $23,280.20, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant performed some work on the project. However, Defendant breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and material provided. As a result of Defendant failing to pay Lienors who provided labor, service and materials to Plaintiffs [sic] real property, Construction Liens were recorded against same, which Plaintiffs had to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay Lienors, the misapplication of construction funds and financial mismanagement, Plaintiffs were forced to borrow additional funds from their construction lender. By unacknowledged statement dated August 23, 2002, Ms. Beltz declared that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared that she had found on the internet two pieces of real property owned by Thomson Homes, Inc., but they had been transferred within the past year. Ms. Beltz stated that she searched the database of the "Department of Motor Vehicles in Palm Beach County" in May 2000 and found no vehicles or boats registered to Thomson Homes, Inc. Lastly, she reported that she contacted the "Federal Aviation Association" at an unspecified time and found no "airplanes" registered to Thomson Homes, Inc. On November 26, 2002, Respondent issued an Order approving the Beltzes' claim of $17,222.78 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Beltzes are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 27, 2002, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Beltzes and Respondent, contests the payment to the Beltzes and the automatic suspension of Petitioner's license. The petition contests the payment of the Beltzes' claim because they did not submit all of the necessary exhibits with their claim; their judgment is against Thomson Homes, Inc., and not Petitioner; and their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes. Additionally, the petition contests the automatic suspension because Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes; the Beltzes' claim is incomplete; and the Beltzes' judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3543 involves the claim of Keith and Karen Deyo. The Deyos entered into a construction contract with Thomson Homes, Inc., on October 31, 1998. Pursuant to the agreement, the Deyos agreed to pay Thomson Homes, Inc., $25,500 for a lot and $123,400 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. Although the Deyos clearly suffered damages from the acts and omissions of Thomson Homes, Inc., the record does not disclose how much they paid the company, how much they had to pay unpaid suppliers and laborers, and how much construction the company completed before abandoning the job. Thomson Homes, Inc., began construction on the Deyos' home about 30-45 days after the parties signed the contract, but all work stopped in July 1999. In an undated complaint, the Deyos commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment] of the project prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Deyos obtained a final summary judgment against Thomson Homes, Inc., on March 15, 2000, for a total sum of $55,458.64, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant partially performed work under the Contract. However, it breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and material provided. As a result of Defendant failing to pay lienors who provided labor, services and materials to Plaintiffs [sic] residence, construction liens were recorded against same, which Plaintiffs had to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 27, 2000, the Deyos signed a claim under the Recovery Fund, but the record contains no indication when the claim was filed. A cover letter dated May 8, 2000, suggests that the Deyos mailed their claim a couple of weeks after signing it, so it was probably filed in mid-May 2000, although their questionnaire bears a revision date of November 2001, which would be beyond two years after the violation. In the questionnaire, the Deyos did not respond to the question asking if they had made a diligent effort to collect payment from the contractor. By an undated and unacknowledged statement, Mr. Deyo declared that someone at the Florida Department of State advised him that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. He also declared that he had found on the internet two pieces of real property owned by Thomson Homes, Inc., but they had been transferred within the past year. Mr. Deyo stated that he searched the database of the "department of motor vehicles in Palm Beach County" in on April 14, 2000, and found no motor vehicles or boats registered to Thomson Homes, Inc. Lastly, he reported that he contacted the "Federal Aviation Association" on April 21, 2000, and found no "airplanes" registered to Thomson Homes, Inc. On January 22, 2003, Respondent issued an Order acknowledging the Deyos' claim of $55,458.64, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Mr. Deyo is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On February 3, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Respondent and the Deyos' attorney who represented them in the action against Thomson Homes, Inc., contests the payment to the Deyos and the automatic suspension of Petitioner's license. The petition contests the payment of the Deyos' claim and suspension of Petitioner's license because Petitioner did not receive notice of the hearing at which Respondent entered the Order; the Deyos did not satisfy all requirements for payment from the Recovery Fund; their claim was not accompanied by certified copies of the levy and execution documents; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3544 involves the claim of Sylvia Reinhardt. Ms. Reinhardt entered into a construction contract with Thomson Homes, Inc., on October 14, 1998. Pursuant to the agreement, Ms. Reinhardt agreed to pay Thomson Homes, Inc., $45,000 for a lot and $147,150 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After Ms. Reinhardt paid Thomson Homes, Inc., $144,769, directly and indirectly, by way of her construction lender, the house was little more than half complete when Thomson Homes, Inc., abandoned the job. Thomson Homes also failed to pay various suppliers that filed liens, so Ms. Reinhardt had to pay $8550.41 to RTS Roofing, $882 to Palm Beach Garage Door, and $3421.32 to Woodworks, Inc. In an undated complaint filed in 1999 (actual date illegible), Ms. Reinhardt commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiff's residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. Ms. Reinhardt obtained a final summary judgment against Thomson Homes, Inc., on March 28, 2000, for a total sum of $61,471.15, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant performed work under the Contract. However, it breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and materials provided. As a result of Defendant failing to pay lienors who provided labor, services and materials for the construction of Plaintiff's residence, construction liens were recorded against same, which Plaintiff had to satisfy. As a result of Defendant abandoning the project, Plaintiff was compelled to retain a new contractor to complete their [sic] home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiff has been forced to borrow additional funds from her construction lender. On April 17, 2000, Ms. Reinhardt filed a claim with the Recovery Fund. In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Reinhardt answered "yes" and explained: "Telephone calls were unanswered. Certified mail requesting response were [sic] never answered. Our attorney made written and personal contact with the owner and there was no intention to pay." The claim states that the violation took place in July 1999. By acknowledged statement dated July 21, 2000, Ms. Reinhardt declared that she had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy her judgment. Ms. Reinhardt stated that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared that she had found one parcel of property owned by Thomson Homes, Inc., and valued at $115,387, but this had been sold to "Joan Thomson" on February 1, 2000. Ms. Reinhardt stated that she had found tangible personal property worth $5000. She added that she had not found any motor vehicles registered with the Department of Highway Safety and Motor Vehicles, nor had she found anything registered with the "FAA." On November 26, 2002, Respondent issued an Order acknowledging Ms. Reinhardt's claim of $58,661.44, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Reinhardt is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 24, 2002, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Reinhardt and Respondent, contests the payment to Ms. Reinhardt and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Reinhardt's claim and suspension of Petitioner's license because Ms. Reinhardt did not submit certified copies of the levy and execution documents; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3545 involves the claim of Louis and Ann Mahoney. The Mahoneys entered into a construction contract with Thomson Homes, Inc., on June 28, 1999, for the construction of a home in Martin County. Pursuant to the agreement, the Mahoneys agreed to pay Thomson Homes, Inc., $32,000 for a lot and $149,000 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 150 days from the date of slab pour. After the Mahoneys paid Thomson Homes, Inc., $14,500, directly and indirectly, by way of their construction lender, they suffered damages due to the acts and omissions of Thomson Homes, Inc., although, again, the record does not describe specifically how Thomson Homes caused them damage. In an undated complaint that bears no filing date, the Mahoneys commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Mahoneys obtained a final summary judgment against Thomson Homes, Inc., on April 13, 2000, for a total sum of $43,084.49, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant breached its contract by accepting Plaintiffs' deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor, and/or services provided. As a result of Defendant failing to pay lienor's [sic] who provided labor, services and materials for the construction of Plaintiffs [sic] residence, a construction lien was recorded against Plaintiffs' property, which Plaintiffs will have to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 30, 2000, the Mahoneys signed a claim under the Recovery Fund. Although the claim form bears no filing date, the completed questionnaire attached to the claim was filed on May 3, 2000, so that is the likely filing date of the claim. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Mahoneys answered "yes" and explained: "This is explained in General Allegations, enclosed with this paperwork." Evidently, the reference is to a copy of the circuit court complaint. By acknowledged statement dated April 8, 2002, Mr. Mahoney declared that he had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy his judgment. Mr. Mahoney stated that someone at the Florida Department of State advised him that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. He also declared that an internet search had disclosed no property owned by Thomson Homes, Inc. Mr. Mahoney stated that the "department of motor vehicles in Palm Beach County" found no motor vehicles or boats registered to Thomson Homes, Inc., and that the "FAA" had found nothing registered to Thomson Homes, Inc. On February 28, 2003, Respondent issued an Order acknowledging the Mahoneys' claim of $38,185, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Mr. Mahoney is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Mahoneys and Respondent, contests the payment to the Mahoneys and the automatic suspension of Petitioner's license. The petition contests the payment of the Mahoneys' claim and suspension of Petitioner's license because they did not submit all of the required exhibits; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3546 involves the claim of Dennis and Carolyn DeStefanis. The DeStefanises entered into a construction contract with Thomson Homes, Inc., on April 7, 1999. Pursuant to the agreement, the DeStefanises agreed to pay Thomson Homes, Inc., $137,455 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 150 days from the date of slab pour. After the DeStefanises paid Thomson Homes, Inc., $15,765, directly and indirectly, by way of their construction lender, Thomson Homes, Inc. never did any work, except to contract with a surveyor, who, unpaid, filed a claim of lien against the DeStefanises's lot. In an undated complaint bearing no filing date, the DeStefanises commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The DeStefanises obtained a final summary judgment against Thomson Homes, Inc., on March 15, 2000, for a total sum of $36,701.87, including attorneys' fees and costs. The judgment states, in part: Subsequent to entering . . . into the above referenced contract, Defendant, [sic] breached its contract by accepting Plaintiffs [sic] deposits and construction loan disbursements and thereafter abandoning the project. [sic] As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 19, 2000, the DeStefanises filed a claim with the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the DeStefanises answered "yes" and explained: "Went to DBPR Investigative Services, hired Attorney Barry W. Taylor [attorney in circuit court action], got Final Summary Judgment against Thomson Homes, Inc." On March 20, 2003, Respondent issued an Order acknowledging the DeStefanises' claim of $34,965.52, approving the payment of $15,765 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the DeStefanises are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On April 7, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the DeStefanises and Respondent, contests the payment to the DeStefanises and the automatic suspension of Petitioner's license. The petition contests the payment of the DeStefanises' claim and suspension of Petitioner's license because they did not submit all of the required exhibits; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. The petition contests the suspension of Petitioner's license on the additional ground that he was not the qualifier for Thomson Homes, Inc., when it and the DeStefanises entered into the construction contract. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3547 involves the claim of James and Donna Barr. The Barrs entered into a construction contract with Thomson Homes, Inc., on September 12, 1998. Pursuant to the agreement, the Barrs agreed to pay Thomson Homes, Inc., $30,000 for a lot and $140,900 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. The Barrs paid Thomson Homes, Inc., $8500 in the form of a down payment. They or their construction lender paid Thomson Homes, Inc., considerably more money and suffered the imposition of claims of lien by unpaid subcontractors and suppliers, but, after negotiating with the bank, emerged from the transaction having lost only the $8500 down payment. Thomson Homes, Inc., obtained permits in April 1999 and started construction in May 1999. Before abandoning the job, Thomson Homes, Inc., worked on the home in May, June, and July of 1999. The Barrs and their lender did not make additional payments after the Barrs found the Thomson Homes, Inc., office empty on August 1, 1999. In a complaint filed October 6, 1999, the Barrs commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Barrs obtained a final summary judgment against Thomson Homes, Inc., on May 8, 2000, for a total sum of $45,435.62, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, partially performed work under the Contract. However, Defendant breached the contract by accepting Plaintiffs [sic] deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor services and materials provided. As a result of Defendant failing to pay lienors who provided labor, services and materials for the construction of Plaintiffs [sic] residence, construction liens were recorded against same, which Plaintiffs will have to satisfy. As a result of Defendant abandoning the project, Plaintiffs will be compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienors, the misapplication of construction funds and financial mismanagement Plaintiffs will be forced to borrow additional funds from their construction lender. On June 2, 2000, the Barrs filed a claim under the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Barrs answered "yes" and explained: "I have looked into the assets of Thomson Homes Inc. and they do not have any. My affidavit is attached." The completed questionnaire states that the Barrs discovered the violation on August 11, 1999. They therefore failed to file their claim within two years of the discovery of the violation. By acknowledged statement dated May 23, 2000, Ms. Barr declared that she had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy her judgment. Ms. Barr stated that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared she had found no property owned by Thomson Homes, Inc., in Palm Beach County. Ms. Barr stated that the Department of Highway Safety and Motor Vehicles found no motor vehicles or boats registered to Thomson Homes, Inc., and that the internet site of the "FAA" had revealed nothing registered to Thomson Homes, Inc. On November 26, 2002, Respondent issued an Order approving the payment of the Barrs' claim of $8500 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Barrs are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 27, 2002, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Barrs and Respondent, contests the payment to the Barrs and the automatic suspension of Petitioner's license. The petition contests the payment of the Barrs' claim and suspension of Petitioner's license because they did not submit a certified copy of the levy and execution documents; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3633 involves the Joanne Myers. Ms. Myers entered into a construction contract with Thomson Homes, Inc., on February 7, 1999. Pursuant to the agreement, Ms. Myers agreed to pay Thomson Homes, Inc., $29,500 for a lot and $125,400 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. Ms. Myers directly or indirectly paid Thomson Homes, Inc., $12,840. According to Ms. Myers' claim, Thomson Homes, Inc., never commenced construction before going out of business in August 1999. In an undated complaint bearing no filing date, Ms. Myers commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiff's residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. Ms. Myers obtained a final summary judgment against Thomson Homes, Inc., on May 31, 2000, for a total sum of $28,307.77, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering . . . into the above referenced contract, Defendant breached the contract by accepting Plaintiff's deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor services and materials provided. As a result of Defendant failing to pay lienor's [sic] who provided labor, services and/or materials for the construction of Plaintiff's residence, construction liens were recorded against same, which Plaintiff will have to satisfy. As a result of Defendant abandoning the project, Plaintiff will be compelled to retain a new contractor to complete her home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiff will be forced to borrow additional funds from her construction lender. On September 18, 2000, Ms. Myers filed a claim with the Recovery Fund. In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Myers answered "yes" and explained: "Contractor closed corporate office--would not answer telephone calls." By letter dated November 30, 2000, from James Brogan of WEI Consulting Group to Ms. Myers, Mr. Brogan states that he had investigated the assets of Thomson Homes, Inc. Mr. Brogan found no bankruptcy filing by Thomson Homes, Inc., in the Southern District of Florida. Thomson Homes, Inc., was a party to 282 legal actions and owed tangible personal property taxes on furniture in a model home. On February 28, 2003, Respondent issued an Order approving the payment of Ms. Myers' claim of $14,080.66 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Myers is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Myers and Respondent, contests the payment to Ms. Myers and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Myers' claim and suspension of Petitioner's license because she did not submit evidence of a diligent search for assets; she did not submit all of the required exhibits; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. On January 4, 2004, Ms. Myers died. However, the probate court of Lancaster County, Pennsylvania, issued letters testamentary on her estate to James W. Myers III, in whose name Ms. Myers' claim is now being prosecuted. At the hearing, Petitioner contended that most, if not all, of the claims failed because the claimants had not exercised reasonable diligence in searching for assets, although Petitioner has dropped this contention in its proposed recommended order. In his petitions for hearing, Petitioner raised this contention only as to Ms. Myers. Ms. Myers, as well as the remainder of the claimants, made or caused to be made a reasonable search and inquiry for the assets of Thomson Homes, Inc. It is obvious that Thomson Homes, Inc., had no assets by the first letter from Mr. Brogan, dated November 30, 2000, nor did it have assets when Mr. Brogan issued his later letter on June 5, 2001, or when the attorney issued his affidavit on August 9, 2001. What is reasonable, in terms of a search, is dictated here by the fact that Thomson Homes, Inc., had no discoverable assets against which it could be made to answer for the considerable fraud that it perpetrated against these nine claimants. Respondent provided all of the parties, including Petitioner, with notice of its hearings at which it entered Recovery Fund orders. The petitions contend that Petitioner received no such notice in the Whitesides and Deyos cases. Although not litigated at the hearing, the presumption of notice, pursuant to the recitations set forth in each of Respondent's orders, results in a finding that Petitioner received timely notice in all cases.

Recommendation It is RECOMMENDED that Respondent enter a final order dismissing the claims against the Recovery Fund of the Beltzes and Barrs; paying the claims against the Recovery Fund of the remaining claimants, pursuant to the provisions of the orders of Respondent already issued in these cases and pursuant to the provisions of Section 489.143(1)-(6), Florida Statutes; and dismissing Respondent's request for the automatic suspension of Petitioner's license, pursuant to Section 489.143(7), Florida Statutes, without prejudice to any separate disciplinary proceedings that Respondent has commenced or may commence against Petitioner or others for the acts and omissions involved in these nine cases. DONE AND ENTERED this 17th day of February, 2004, in Tallahassee, Leon County, Florida. S ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of February, 2004. COPIES FURNISHED: Bruce G. Kaleita Law Office of Bruce G. Kaleita, P.A. 1615 Forum Place, Suite 500 West Palm Beach, Florida 33401 Adrienne C. Rodgers Assistant General Counsel Department of Business and Professional Regulation 1940 North Monroe Street, Suite 60 Tallahassee, Florida 32399-1023 Tim Vaccaro, Director Construction Industry Licensing Board Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 Nancy Campiglia, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202

Florida Laws (10) 120.569120.57468.631489.1195489.129489.132489.140489.141489.14357.111
# 7
DANIEL J. AND DORIS S. JOHNSON vs MICHAEL R. HARVEY, KLINGSHIRN AND ASSOCIATES, AND CONSTRUCTION INDUSTRY LICENSING BOARD, CONSTRUCTION INDUSTRIES RECOVERY FUND, 96-004693 (1996)
Division of Administrative Hearings, Florida Filed:Titusville, Florida Oct. 03, 1996 Number: 96-004693 Latest Update: Jul. 15, 2004

The Issue The issue for determination is whether Respondent, Construction Industries Recovery Fund ("Respondent"), should reimburse Petitioners for damages caused by a contractor.

Findings Of Fact 1. Respondent is the governmental agency responsible for processing claims against it pursuant to Sections 489.140 through 489.143. Petitioners are natural persons within the meaning of Section 489.140(1). Except for the matters to be determined in this proceeding, Petitioners are otherwise eligible to seek recovery from Respondent within the meaning of Section 489.141. Initial Agreement On June 10, 1993, Petitioners entered into a written contract of sale with Klingshirn & Associates, Inc. ("Klingshirn") to construct a home at 6617 Southfork, Titusville, Florida (the "initial agreement"). The total purchase price was $134,000. The home was to be completed by November 24, 1993. The initial agreement required Petitioners to pay $24,000 of the total purchase price from their own funds3 and to make a good faith effort to obtain financing for the remaining $110,000. If Petitioners were unable to obtain financing, Klingshirn reserved the option to provide financing. The terms of financing were prescribed in paragraph 3 of the initial agreement. Paragraph 3 stated: . . . MORTGAGE PROVISION . . . within five (5) days [Petitioners] will make a good faith application with . . . a lender approved by [Klingshirn] for a mortgage loan in the amount set forth above at the prevailing interest rate not to exceed 8 1/2% 30 year and terms of the lender as of closing. If [Petitioners are] not approved for the mortgage within 30 days or any extension [Klingshirn gives them], or if [Petitioners] application is rejected, [Klingshirn] can either provide [Petitioners] with the mortgage on the same terms and conditions as the lender [Petitioners] applied with, or (ii) refund [Petitioners] deposits . . . and terminate this contract. . . . Petitioners and Klingshirn changed the printed text in the initial agreement. They struck through the phrase, "at the prevailing interest rate," and inserted the phrase, "not to exceed 8 1/2% 30 year." Condition Precedent A condition precedent is one which calls for the performance of some act, or the happening of some event, after a contract is entered into upon the performance or happening of which an obligation to perform depends.4 The initial agreement was subject to a condition precedent by its express terms and by oral agreement. The express terms of the initial agreement made the agreement subject to a condition precedent. Petitioners' obligation to perform was expressly dependent on the procurement of financing for $110,000, over a 30 year term, at an interest rate not to exceed 8 1/2 percent per annum. Even if the initial agreement were not expressly subject to a condition precedent, it was subject to such a condition by oral agreement. Prior to and at the time that Klingshirn and Petitioners signed the initial agreement, Petitioners and Klingshirn agreed that the initial agreement would become operative only upon the occurrence of financing. Even if the initial agreement were not subject to a condition precedent, the requisite financing was part of a contemporaneous oral agreement that induced Petitioners to enter into the initial agreement. There was no mutual intent for Petitioners to be obligated unless they procured the prescribed financing from either a commercial lender or Klingshirn. Construction Contract The condition precedent to the initial agreement was never satisfied. The initial agreement never became operative. On July 7, 1993, Petitioners obtained a financing commitment from Harbor Federal Savings & Loan Association in Fort Pierce, Florida ("Harbor"). Harbor agreed to provide financing for $105,000 rather than the $110,000 prescribed in the initial agreement. Petitioners agreed to increase their cash investment. On August 4, 1993, Petitioners and Klingshirn executed a Construction Loan Agreement for $105,000 (the "construction loan agreement"). The construction loan agreement stated: [Klingshirn] hereby . . . agrees to the terms and conditions of the [construction loan], and further agrees that where the [construction loan] conflicts with the terms and provisions of any construction contract existing with Borrower, that the [construction loan] shall control. Petitioners executed the construction loan agreement as borrowers. Klingshirn executed the builder's assent to the construction loan agreement. On August 4, 1993, Petitioners and Klingshirn executed a construction contract within the meaning of Section 489.141(1)(a) (the "construction contract"). The construction contract included the construction loan agreement and those terms in the initial agreement which did not conflict with the construction loan agreement and which Petitioners and Klingshirn adopted when they executed the construction contract.5 The construction contract was executed after July 1, 1993. It controlled the construction of Petitioners' home until it was modified on December 9, 1993. On December 9, 1993, Petitioners agreed to extend the completion date to March, 1994. Klingshirn agreed to repair specified defects and to increase the landscaping allowance. Mismanagement And Misconduct Petitioners did not know that Klingshirn was a corporation engaged in contracting without a qualifying agent in violation of Section 489.119. Mr. Michael R. Harvey, a financially responsible officer of Klingshirn and one of its employees, was licensed as a certified building contractor (the "contractor" or "licensee"). However, the contractor neglected to qualify Klingshirn. The contractor illegally used his license to obtain the necessary building permit on behalf of Klingshirn. He procured the building permit in his own name on August 27, 1993. The contractor knowingly violated Section 489.129. He committed mismanagement and misconduct in the practice of contracting that caused financial harm to Petitioners in the amount of $58,534.46. The contractor failed to ensure that the home was constructed according to either the plans and specifications of the project or the Southern Building Code. He also failed to remedy the violations. The contractor failed to satisfy subcontractor liens after Petitioners gave him the funds to do so. He obtained at least three draws of unspecified amounts from Harbor. The contractor abandoned the job. He failed to perform work without just cause for over 90 consecutive days when the percentage of completion was less than the total contract price paid to him at the time of abandonment. The project was not completed on November 24, 1993. On December 9, 1993, Petitioners and Klingshirn entered into an Addendum to the initial agreement. The Addendum extended the completion date to March, 1994. The contractor failed to meet the extended deadline. On April 4, 1994, construction ceased. On April 14, 1994, the contractor removed himself and his license from the project. Final Order On August 11, 1995, the Department of Business and Professional Regulation filed an Administrative Complaint against the contractor alleging violations of Sections 489.129(d), (h), and (k). The Construction Industry Licensing Board (the "Board") entered a Final Order on January 16, 1996. The Final Order found the contractor guilty of the allegations in the Administrative Complaint. The Board directed the licensee to pay restitution to Petitioners in an unspecified amount based on violations of Sections 489.129(d), (h), and (k) that occurred on or after July 1, 1993. Civil Action On October 23, 1995, Petitioners filed a civil action against the contractor. Petitioners filed the civil action in the Circuit Court of the Eighteenth Judicial Circuit in and for Brevard County, Florida. Daniel J. Johnson and Doris S. Johnson v. Michael R. Harvey, Case Number 95-16601-CA-F. On December 1, 1995, the contractor filed a Suggestion of the Pendency of Bankruptcy in the civil case. On November 25, 1994, the contractor had filed for bankruptcy in the United States Bankruptcy Court, Middle District of Florida. In Re: Michael R. Harvey, Debtor, Case Number 94-11514-8B7. On March 8, 1995, the Bankruptcy Court entered a Discharge of Debtor Order. On December 1, 1995, the bankruptcy trustee notified Petitioners that no assets were available for distribution from the bankruptcy estate except exempt assets. Claim Against Respondent On March 29, 1996, Petitioners filed a claim against Respondent. On June 13, 1996, the Construction Industries Recovery Fund Committee (the "Committee") denied the claim. The Committee determined that Petitioners are required by law to execute a construction contract on or after July 1, 1993, to recover from Respondent. The Committee found that Petitioners executed the required contract on June 10, 1993. On June 14, 1996, the Board ratified the Committee's action. The Board entered a Final Order on August 20, 1996. Payment To Respondent Petitioners paid money to Respondent in statutorily prescribed amounts through a surcharge of one-half cent per square foot of the project. The surcharge is imposed pursuant to Sections 489.140(2) and 468.631. Petitioners received no reimbursement from Respondent. Nor did Petitioners receive restitution from the licensee.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a Final Order and thereinGRANT Petitioners' claim for recovery against Respondent. RECOMMENDED this 20th day of March, 1997, in Tallahassee, Florida. DANIEL MANRY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 20th day of March, 1997.

Florida Laws (8) 11.0211.03468.631489.119489.129489.140489.141489.143
# 8
OFFICE OF FINANCIAL REGULATION vs FAST PAYDAY LOANS, INC., 16-007380 (2016)
Division of Administrative Hearings, Florida Filed:Miami, Florida Dec. 15, 2016 Number: 16-007380 Latest Update: Oct. 02, 2024