DEPARTMENT OF ENVIRONMENTAL REGULATION vs. B. D. TAYLOR AND LANE MOBILE ESTATES, 83-001208 (1983)
Division of Administrative Hearings, Florida Number: 83-001208 Latest Update: Oct. 21, 1983

Findings Of Fact B. D. Taylor, Respondent, is the owner of a wastewater treatment facility near Panama City, Florida, which serves a community of some 125-150 mobile homes at Lane Mobile Home Estates. The facility has a 24,000 gallons per day capacity to provide secondary treatment of wastewater with percolating ponds. It was first permitted in 1971 upon construction and has been in continuous operation since that time. In 1980 Respondent employed the services of a consultant to apply for a renewal of its temporary Permit to operate a wastewater treatment facility. This application stated the temporary operating permit (TOP) was needed to give Respondent time to connect to the regional wastewater treatment facility. The schedule contained in the following paragraph was submitted by Respondent at the time needed to accomplish this objective, Following inspection of the facility, a TOP was issued December 5, 1980 (Exhibit 1), and expired January 1, 1983. TOPs are issued to facilities which do not comply with the requirements for Wastewater treatment. Exhibit 1 contained a schedule of compliance to which Respondent was directed to strictly comply to stop the discharge of pollutants from the property on which the facility is located. These conditions are: Date when preliminary engineering to tie into regional will be complete and notification to DER. July 1, 1981; Date when engineering to tie into regional system will be complete and notification to DER - June 1, 1982; Date construction application will be submitted to phase out present facility - March 1, 1982; Date construction will commence - June 1, 1982; Date construction is to be complete and so certified - October 1, 1982; and Date that wastewater effluent disposal system will be certified "in compliance" to permit - January 1, 1903. None of these conditions or schedules has been met by Respondent. The regional wastewater treatment facility was completed in 1982 and Respondent could have connected to this system in the summer of 1982. This wastewater treatment facility is a potential source of pollution. The holding ponds are bordered by a ditch which is connected to Game Farm Greek, which is classified as Class III waters. The size of Game Farm Creek is such that any discharge of pollution to this body of water would reduce its classification below Class III. On several occasions in the past there have been breaks in the berm surrounding the holding ponds which allow the wastewater in the holding ponds to flow into the ditch and into Game Farm Creek. Even without a break in the berm, wastewater from these holding ponds will enter Game Farm Creek either by percolation or overflow of the holding ponds caused by the inability of the soil to absorb the effluent. On January 28, 1983, this facility was inspected and the results of the inspection were discussed with the operators of the facility. The plant was again inspected on February 8 and February 18, 1983. These inspections disclosed solids were not settling out of the wastewater in the settling tanks; inadequate chlorination of the wastewater was being obtained in the chlorination tanks; samples taken from various points in the system, the ditch along side the holding tanks and in Game Farm Creek, disclosed excess fecal coliform counts; and that very poor treatment was being afforded the wastewater received at the plant as evidence by high levels of total Kejhdal nitrogen and ammonia, high levels of phosphates, high biochemical oxygen demand, and low levels of nitrates and nitrites. In July, 1983, in response to a complaint about odors emanating from the plant, the facility was again inspected. This inspector found the aeration tanks anaerobic, effluent had a strong septic odor, the clarifier was cloudy, the chlorine feeder was empty, no chlorine residual in contact tank, final effluent was cloudy, both ponds were covered with duckweed and small pond was discharging in the roadside ditch (Exhibit 14) Expenses to Petitioner resulting from the inspections intended to bring Respondent in compliance with the requirements for wastewater treatment facilities are $280.32 (Exhibit 9)

Florida Laws (2) 403.087403.088
# 1
ROY RUMPZA vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 90-007798 (1990)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Dec. 10, 1990 Number: 90-007798 Latest Update: Jun. 21, 1991

The Issue The issue in this case is whether Petitioner is entitled to the issuance of a septic tank permit.

Findings Of Fact Petitioner owns land located at 6765 Narcoosee Road in Orange County. He purchased the land in 1983, at which time it was undeveloped and zoned for agricultural use. On June 25, 1990, the Orange County Commission approved the rezoning of the land for industrial use. Petitioner wants to build a mini-warehouse and caretaker's residence on the land. The site is not served by central sewer. The nearest sewage system is a package plant located 0.38 miles north of the site. The package plant serves a mobile home park. Orange County policy forbids any connection to the mobile home park's sewage disposal system until the package plant is replaced by a lift station that would pump the wastewater to the closest central sewer line operated by the County. This point would be at Crossen Drive and Charlin Parkway, which is about 1 to 1 1/2 miles from Petitioner's land. The only other central sewer line in the vicinity is on Lee Vista Boulevard, but it is 1.1 miles west of Petitioner's land. In June, 1990, Petitioner's engineering consultant submitted a request for a permit to install two septic tanks on Petitioner's property. The capacity of the two septic tanks would be 1000 gallons with a drainfield of 417 square feet elevated at least 36 inches above grade. The site plan, which was noted as subject to change, showed one septic tank and drainfield located near the front of the property and the other in the center of the property between the two warehouse buildings. Representatives of the Orange County Health Department found several problems with the request. By letter dated July 3, 1990, the Orange County Health Department noted that, contrary to information contained in the application, the wet season water table was only about 12 inches, not 36-48 inches, from the bottom of the drainfield. Thus, the size of the required fill- pad would preclude locating the septic tank in the middle of the property. More relevant to the present case, the letter asks Petitioner to advise when the property was rezoned from agricultural to industrial. The letter concludes by advising that, if the Health Department determined that it was necessary to apply for a variance, Petitioner would have to submit a $150 fee. By letter dated July 17, 1990, Petitioner's engineer enclosed a check for $150 and requested a variance. By letter dated July 23, 1990, the Orange County Health Department returned the check and requested the additional information concerning the rezoning. By letter dated August 20, 1990, Petitioner's engineer again enclosed a check for $150 and requested a variance. On August 22, 1990, Petitioner executed an application for a variance from Chapter 10D-6 on the grounds of hardship. The request is for two 1000-gallon septic tanks. By letter dated September 26, 1990, Respondent acknowledged Petitioner's request for a variance from the requirements of Chapter 10D-6 and advised that the request had been placed on the agenda of the Variance Review Group, which was meeting on October 4, 1990. The Variance Review Group met and recommended that the variance be granted. However, by letter dated October 24, 1990, Respondent advised Petitioner that the request for variance was denied. The reason for the denial was that recent legislation prohibited septic tanks in areas rezoned from agricultural to industrial uses after July 5, 1989. The Division of Administrative Hearings has jurisdiction over the parties and the subject matter. Section 120.57(1), Florida Statutes. (All references to Sections are to Florida Statutes.) Section 381.272(9) provides in relevant part: No construction permit may be issued for an on-site sewage disposal system in any area zoned or used for industrial or manufacturing purposes, or its equivalent, where a publicly owned or investor-owned sewage treatment system is available, or where a likelihood exists that the system may receive toxic, hazardous, or industrial waste. In areas which are either zoned, rezoned, platted, or subdivided for industrial, manufacturing, or equivalent purposes after July 5, 1989, the department shall not authorize onsite sewage disposal system construction. The two sentences set forth in the preceding paragraph are not in conflict. The first sentence applies to all land. The second sentence applies a more stringent requirement to land first zoned for industrial or manufacturing uses after July 5, 1989. Petitioner's land was first zoned for industrial use after July 5, 1989. Thus, Respondent lacked the authority to authorize the use of a septic tank on Petitioner's land.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Health Rehabilitative Services enter a final order denying Roy Rumpza's request to permit the installation of two septic tanks on this property. ENTERED this 21 day of June, 1991, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21 day of June, 1991. COPIES FURNISHED: Charles G. Stephens Messer, Vickers, et al. Bayport Plaza, Suite 1040 6200 Courtney Campbell Cswy. Tampa, FL 33607 Sonia Nieves District 7 Legal Office Department of Health and Rehabilitative Services 400 West Robinson St. South Tower, Suite 5827 Orlando, FL 32801 Linda K. Harris, Acting General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Sam Power Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700

Florida Laws (1) 120.57
# 2
LAKE COUNTY UTILITIES, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-002356 (1979)
Division of Administrative Hearings, Florida Number: 79-002356 Latest Update: Jun. 26, 1981

The Issue The parties have raised myriad issues hare. Petitioner has alleged being capriciously and arbitrarily denied its permit because similar treatment plants have been licensed nearby. The parties disagree over whether local Lake County Pollution Control Board rules are applicable to Petitioner's plant. If the rules are applicable, they disagree over their interpretation. The parties further disagree over whether Petitioner has pending an application for a waste water treatment plant operating permit. It is this last issue which is discussed below because it is dispositive of the case.

Findings Of Fact Petitioner operates a waste water treatment plant in Lake County, Florida which serves four motels at the intersection of U.S. Highway 27 and SR 19 immediately to the south of Interchange 27 on the Florida Turnpike. On October 27, 1972, DER issued a construction permit to Petitioner to construct the plant at a design capacity of 250,000 gallons per day (gpd). The treated effluent was proposed to be discharged via a spray irrigation system to the ground water on Petitioner's site. The plant has never operated at capacity. Its normal volume has ranged from between a low of 40,000 gpd to a peak of 140,000 gpd. Petitioner's plant is situated on a 12.5 acre site over a clay hard pan. The hard pan which is immediately below the ground surface prevents adequate percolation of the plant's effluent down to the underlying ground water. During periods of heavy rain the effluent from the plant has breached a retaining dike and flowed directly into a marsh area known as the Little Everglades to the north. Petitioner has submitted four permit applications to the Department. The first, submitted in September of 1972 was for the construction permit already mentioned. The next applications dated October 22, 1973, was for an operation permit. The application indicated that there would be no discharge to surface waters but there would be a discharge to ground waters. The application also indicated that the availability of space for the expansion of the plant was limited to the site at that time. Petitioner later purchased additional land not reflected in this application. The operation permit was never granted by the Respondent. As stated by Mr. Potter, President of Lake County Utilities, Inc., "In the fall of 1973, I made an application as engineer for the utility company to the Florida DPC [Department of Pollution Control] and to Lake County for an operation permit. That permit was denied by the Department on the ground that we had not satisfied Lake County as to the total containment of our effluent." Subsequently on August 30, 1976, Petitioner submitted a construction permit application to DER for permission to add a 1.32 acre oxidation-polishing pond, to regrade and regrass the existing spray irrigation field, to construct a 0.40 acre denitrification pond and to add a nutrient uptake. No increase in the design capacity was proposed. On that application Petitioner indicated that there would be a discharge to the surface waters of the state. In answer to that part of the application which asked for proposed drainage path of the effluent Petitioner stated, "From treatment plant to 'on-site' ponds to 'on-site' grassy pond and marsh would overflow to ajacent Florida DOT [Department of Transportation] borrow pit: thence via developed drainage waste to the 'Little Everglades' swamp: then, via developed canal and ditches and through natural ponds and marshes to 'Little Lake Harris' and ultimately the Atlantic Ocean." This permit was denied by DER because the Lake County Pollution Control Board did not approve the plan. Finally on September 29, 1978, Petitioner applied for another construction permit. Thee construction would include: Construction of storm water control structures and culverts: Regrading of water and sewer plant sites; Construction of percolation pond "A" and enclosing dikes; and Construction of percolation pond "B" and enclosing dikes. This application was made in response to advice from DER that Petitioner's plant should be in a no discharge condition in order to comply with Lake County Pollution Control rules. On November 2, 1979, the Department issued a Letter of Intent to deny the last permit application because the application was deemed to be incomplete and because the further data which DER requested was not provided. In response to DER's intent to deny the construction permit Petitioner on November 20, 1979, filed its Petition for an Administrative Hearing. Petitioner does not now intend to construct the proposed facilities for which it requested the construction permit in September of 1978. The following colloquy is from the final hearing. Mr. Stephens Have you-- Can you describe briefly the nature of the changes proposed in your 1978 construction permit application? Mr. Potter 1978 construction permit application on nominally the five acre parcel to create a diked pond or lake. Mr. Stephens Uh-huh. Mr. Potter Solely that. The part on the nominally two and a half acre parcel, give or take, was to create a deep percolation pond in which I proposed digging through the clay to the sand and shell below. Mr. Stephens Uh-huh. Mr. Potter So that waters that entered that pond, A, because of its depth, would denitrify and release nitrogen contents to the atmosphere; and, the water would, because of its hydraulic head in relation to the soil below, would push its way into the soils below. Mr. Stephens Uh-huh. Mr. Potter But in the event I could not dispose of the water through that form of percolation, it would overflow into the five acre diked area. And thereby I hoped to satisfy Lake County and the D.E.R. and solve this lingering festering problem. Mr. Stephens Uh-huh. You are the Petitioner in this case. Is it your desire or intention to complete those. . .that construction? Mr. Potter Now that I have been made aware of the law, the law of Chapter four oh three, the rules of Florida D.E.R. and become clear as to the ordinances adopted by the County Commission and the Lake Pollution Board of Lake County as to Class 3-B waters, I have no intention of squandering my money, and, in effect, the money of my customers, in such a wasteful pursuit. Mr. Stephens So you're saying here under oath you don't intend to perform that work even if granted a permit? Mr. Potter Not shy of a court order. As the result of Mr. Potter's testimony on behalf of the Petitioner at the final hearing, it is found that Petitioner has withdrawn its September 1978 application for a construction permit. There is not now pending before the Department of Environmental Regulation a valid permit application for the Petitioner to operate its waste water treatment plan. On May 9, 1980 Lake County Utilities, Inc. served Petitioner's Fourth Interrogatories to Respondent which asked by Interrogatory 10: Please state when and by whom the Department of Environmental Regulation has caused field studies to be made and samples to be taken out of the waters of Lake County (and specifically the geographical vicinity of U.S. 27 - S.R. 19 - Fla. Turnpike) periodically and in a logical geographic manner so as to determine the levels of water quality of the waters as such studies and sampling is within the powers and duty of the Department as mandated by the Florida Legislature in Chapter 403 of the Laws of Florida. (emphasis in original) The Department responded: 10. The Department conducts sampling in the waters of Lake County in conjunction with individual permit applications and not on a systematic basis throughout the County. Respondent objects to this interrogatory as being irrelevant to this proceeding in that the subject permit was not denied on the basis of anticipated water quality violations, but rather, as a result of the pollution control ordinances of Lake County, Florida, which prohibit any discharge to surface waters from the subject facility, and which the Department is required to enforce pursuant to Section 403.182(6), Florida Statutes.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it Is RECOMMENDED: That the State of Florida, Department of Environmental Regulation enter a Final Order dismissing the Amended Petition for Administrative Hearing without prejudice, however, to the filing of a new application by Petitioner for a waste water treatment plant operating permit. DONE and RECOMMENDED this 12th day of May, 1981, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of May, 1981.

Florida Laws (6) 120.565120.57120.65403.087403.088403.182
# 3
HUDSON HARGETT vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 90-002487 (1990)
Division of Administrative Hearings, Florida Filed:Cross City, Florida Apr. 25, 1990 Number: 90-002487 Latest Update: Dec. 21, 1990

The Issue The issues to be resolved in this proceeding concern whether the Petitioner is entitled to a permit permitting installation of an on-site sewage disposal system (OSDS) on his property located in Dixie County, Florida, in the vicinity of the Suwannee River and whether he is entitled to seek a variance from the statutes and rules concerning permitting of such systems.

Findings Of Fact The department hereby adopts and incorporates by reference the findings of fact set forth in the Recommended Order.

Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is therefore RECOMMENDED: That a Final Order be entered denying the Petitioner's application for an OSDS permit, without prejudice to the applicant applying for and seeking a variance from the statutory and rule requirements related to permitting for the reasons found and concluded above, and without prejudice to applying for and pursuing an OSDS permit application should the applicant, at a later time, be able to demonstrate that alternative methods of treatment and disposal of the sewage effluent at issue can feasibly be performed, within the bounds of the standards enunciated in the above-cited statutes and rules concerning on- site sewage disposal permitting. DONE and ENTERED this 21st of December, 1990 in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of December, 1990. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 90-2487 PETITIONER'S PROPOSED FINDINGS-OF FACT Accepted. Accepted. 5-14. Accepted. RESPONDENT'S PROPOSED FINDINGS OF FACT 1-7. Accepted. COPIES FURNISHED: Sam Power, Agency Clerk Department of HRS 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Linda K. Harris, Esquire General Counsel Department of HRS 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John K. McPherson, Esquire 22 South Main Street Gainesville, FL 32601 Frances S. Childers, Esquire Assistant District III Legal Counsel Department of HRS 1000 Northeast 16th Avenue Gainesville, FL 32609 =================================================================

Florida Laws (2) 120.5790.803
# 4
JACQUELINE M. LANE vs INTERNATIONAL PAPER COMPANY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 01-001490 (2001)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida Apr. 18, 2001 Number: 01-001490 Latest Update: Nov. 30, 2001

The Issue The first issue is whether Petitioner, Jacqueline M. Lane (Lane) has standing. The second issue is whether International Paper Company (IP) provided reasonable assurances it has the ability to meet the conditions of the existing industrial wastewater permit for the wastewater treatment facility at the paper mill in Cantonment, Florida, pursuant to Rule 62- 620.340(3), Florida Administrative Code. A final issue is whether Lane litigated this matter for an improper purpose.

Findings Of Fact Based on the evidence and testimony of the witnesses presented and the entire record in this proceeding, the following facts are found: The Parties The Department is charged with the responsibility for determining whether to approve the Application for transfer of permit number FL0002562-002-IWF/MT from Champion to IP. IP is a corporation authorized to do business in the State of Florida. IP operates a bleach kraft fine paper mill in Cantonment, Florida, formerly operated by Champion. Lane is a citizen of the State of Florida who lives on Perdido Bay. Application for Transfer of Industrial Wastewater Permit Number FL0002526-002-IWF/MT In June 2000, IP notified the Department it was acquiring Champion as a wholly owned subsidiary. IP took over operation of the facility in Cantonment on January 1, 2001. At that time, the companies had fully merged. On January 19, 2001, IP timely submitted an Application for Transfer of a Wastewater Facility or Activity Permit (Application) and advised the Department that "the permittee name for the pulp and paper mill in Cantonment, Florida[,] has been changed from 'Champion International Corporation, Inc.' to 'International Paper Company.'" Several wastewater permit- related documents were submitted to the Department as part of this name change. The Department processed IP's Application to transfer the facility's permit pursuant to Rule 62-620.340(3), Florida Administrative Code. "The parties agree that this matter is controlled by Rules 62-4.120 and 62-620.340, F.A.C., regarding the transfer of the permit. The parties [did not agree] upon what conditions of the combined permits are applicable to determine whether the Department has received 'reasonable assurances that the conditions of the permit will be met.' Rule 62-620.340(3), F.A.C." Rule 62-620.340(3), Florida Administrative Code, provides: "The Department shall allow the transfer under subsection (2) of this section unless it determines that the proposed permittee cannot provide reasonable assurance that conditions of the permit will be met. The determination shall be limited solely to the ability of the proposed permittee to comply with the conditions of the existing permit, and it shall not consider the adequacy of these permit conditions." (Emphasis added). This proceeding does not involve an enforcement action or consideration of whether the wastewater permit, and related documents, should be renewed. Champion's renewal application is under consideration by the Department. The parties agree that the documents described in Findings of Fact 10-19, infra, set forth the conditions of the permit number FL0002526-002-IWF/MT at this time. These documents are listed below: November 15, 1995, DEP Order (combining the NPDES permit and the State- issued wastewater permit) April 22, 1996, DEP Letter (clarifying November 15, 1995, Order regarding 1983 NPDES Permit) January 3,1983, EPA NPDES Permit December 13, 1989, DER Temporary Operating Permit December 1, 1989, DER Consent Order December 12, 1989, DER Variance The Permit(s), Consent Order, Variances, and Related Permit Documents Before May 1, 1995, in order to operate the wastewater treatment facility at the mill in Cantonment, both state and federal permits were required. The Department or its predecessor agency, the Department of Environmental Regulation (DER), issued state permits pursuant to Sections 403.08 and 403.088, Florida Statutes, and applicable rules. The United States Environmental Protection Agency (EPA) issued federal National Pollutant Discharge Elimination System (NPDES) permits pursuant to 40 Code of Federal Regulation Section 124.15. As a result of EPA's delegation of its NPDES authority to the Department in 1995, only one permit is now required. The 1995 Memorandum of Agreement between EPA and the Department does not allow the Department to modify a permit that has been administratively continued. Modifications to permit limits have to be made through the permit renewal process. On or about January 3, 1983, the EPA issued a NPDES permit to St. Regis Paper Company, authorizing discharge from the facility, located at the paper mill in Cantonment to the receiving waters named Eleven Mile Creek (creek). This NPDES permit contains the federal permit conditions applicable at this time. (EPA has since used the facility as a benchmark model to develop effluent guidelines for its new cluster rule.) On December 1, 1989, the DER entered into a Consent Order with Champion International Corporation. This Consent Order was issued as a result of Recommended and Final Orders issued in Perdido Bay Environmental Association, Inc. et al. v. Champion International Corporation and Florida Department of Environmental Regulation, 12 F.A.L.R. 126 (DER Nov. 14, 1989). This Consent Order allowed the continued operation of the facility. As a compliance requirement, a study report was required to include "an evaluation of technologies and treatment alternatives . . . to determine the most environmentally sound and practicable means to correct identified water quality violations caused by Champion." The studies required by the Consent Order are needed to pinpoint sources of pollutants in the creek and Perdido Bay (bay). The Consent Order has no expiration date although it is tied to the temporary operating permit (TOP) which had an expiration date of December 1, 1994. Extensive studies have been submitted to the Department pursuant to paragraph 14.A. of the Consent Order, which are necessary to trigger "the final compliance plan." This has been an ongoing process since the Consent Order and TOP were issued. The conditions in the Consent Order and TOP apply at this time. Various discharge limitations and monitoring requirements are set forth in the TOP. On December 13, 1989, DER issued a TOP, Number IT17- 156163, to the facility, which was issued in conjunction with the Consent Order. The TOP expressly relies on the Consent Order for authorization. It contains the effective state permit conditions at this time. On December 8, 1989, DER issued a Variance from water quality standards for color (transparency), iron, zinc, and the general water quality criterion for specific conductance. The standards in the Variance are part of the TOP and are effective at this time. The mill no longer needs the Variance for iron and zinc. As to those parameters, it currently operates at lower levels than under the Variance. On November 15, 1995, the Department combined the state and federal operating permits into a single permit identified as Wastewater Permit Number FL0002526-002-IWF/MT. The TOP and NPDES permit were administratively continued when renewal applications were filed. The Department will transfer to IP the permit documents described in Finding of Fact 9, supra. The Department will also transfer the pending permit renewal applications filed by Champion. Wastewater Treatment Facility at the Paper Mill in Cantonment, Florida In the past, Champion owned and operated a 1400-ton per day bleach and kraft pulp and paper mill in Cantonment. The operation is now conducted by IP. The paper mill treats its effluent from industrial activities at an on-site wastewater treatment facility (facility). Stormwater that falls on the industrial portion of the mill is also processed through the facility. The mill is required to and takes monthly samples from the creek for a few parameters, e.g., DO and pH, to provide data to the Department for use in developing possible changes to effluent limitations in a final compliance plan. There is an installed structure that continuously measures the flow of the effluent at the end of the facility's treatment system. This point, i.e., where the flow is measured, is called the Parshall Flume which is the compliance point for the facility. The effluent at Parshall Flume is automatically sampled each day, analyzed, and reported on a monthly basis to the Department. The analyses are reviewed and compared to the effluent limitations for a particular permit. The treated effluent is discharged from the Parshall Flume through a pipe to natural wetlands. In this wetland area, the treated effluent combines with several streams, non- processed stormwater, and runoff from land south and west of the facility. Runoff from residential areas and areas west of the mill, including the City of Cantonment, also flows into this area. The IP mill is not the only source of discharge into this area. After passing through the natural wetlands, the treated effluent runs through a pipe that discharges into the creek from below the surface. This point is about a half-mile from the facility. It is called the "boil" because the water from the pipe boils up into the creek. The "boil" is not a compliance point. On occasion, a Department inspector has taken water samples at the boil. Each time, his sampling has shown water quality standards were met at the boil. At the boil, the water flowing into the creek from the pipe contains treated effluent and drainage from areas not associated with the mill. From the boil, the creek flows a distance of fourteen miles to Perdido Bay (the bay). At the boil, there is also stormwater runoff and drainage from residential areas flowing into the creek in addition to the water from the pipe. Along the sides of the creek to the bay is a large drainage basin, which includes agricultural and residential runoff that flows into the creek. The boil, which is non-processed stormwater of the creek, could be contaminated from non-IP sources. Sources of pollutants in the bay include residential and agricultural stormwater runoff, Perdido River, and the creek. The Escambia County Utility Authority (ECUA) also has a treatment plant that has a discharge into the bay. Saltwater intrusion and runoff from development are additional sources of pollutants in the bay. Lane takes samples at the boil and most recently in May and June of 2001. Her measurement of dissolved oxygen (DO) was approximately 2.6 and for specific conductance, between 1600 and 2000. Lane also samples the water at a bridge (279A) two miles down the creek from the boil. Lane testified regarding bacteriological quality at the boil or further down stream, that fecal coliforms, including the bacteria Klebsiella, were present. Lane is not a certified sampler. She does not have the required quality control/quality assurance program. Lane does not know the Department requirements to sample dissolved oxygen. She could not describe an approved standard for such sampling. Surface Water Quality Standards Unless otherwise provided through relief mechanisms, discharges into surface waters must meet the minimum water quality standards set forth in Rules 62-302, Florida Administrative Code. Relief mechanisms include variances, consent orders, and temporary operating permits. The Department has issued variances, consent orders, and temporary operating permits to allow permit holders time to respond to changes in water quality standards and related regulations that reflect changes in understanding of environmental impacts to water bodies. Permit Conditions The permit conditions do not require compliance with all the water quality criteria in Chapter 62-302, Florida Administrative Code, for water quality parameters. The Department has not yet agreed on "final treatment solutions" it can require under the Consent Order. See, e.g., Finding of Fact 49. Specific deviations from the surface water quality standards in Chapter 62-302, Florida Administrative Code, are authorized by the Consent Order, TOP, variance, and NPDES permit. The specific effluent discharge limitations in the TOP and NPDES permit, are for BOD5, TSS, iron, specific conductance, pH, and zinc. (The reference to condition 12 in paragraph 25 of the TOP has not been amended.) Several of the effluent limitations (e.g., specific conductance) were granted by the Variance. Paragraph 26 of the TOP specifies the monitoring and frequency requirements for the monitoring at the Parshall Flume. This monitoring information can be used by the Department to pinpoint sources of pollutants in the creek and in order to establish numerical, water-quality based effluent limitations for those sources. General Condition 5 of the TOP does not per se impose on the mill the duty to meet all water quality standards in Chapter 62-302, Florida Administrative Code. The TOP authorizes "a certain amount of pollution" and "certain relief." The TOP further established a "compliance schedule" for Champion to study the impacts of the discharge. However, the Department rules allow for reopening of the TOP and changing the permit conditions to reflect new evidence causing a concern regarding pollution. Here, the Department has not reopened the TOP. The permit, including the TOP and Consent Order, allows the mill a period of time to come into compliance with all minimum water quality standards. When a final permit is eventually issued, the facility will have to meet these standards absent some express relief mechanism at that time. IP Provided Reasonable Assurances of Its Ability to Meet Permit Conditions The Department employee who reviewed IP's Application to transfer the permit is an expert in environmental engineering. At the time he reviewed the Application, he was familiar with the existing permit conditions. As part of his review, he ascertained whether IP was satisfying the conditions of the permit and determined it was. The Department reviewed IP's annual report and other corporate brochures as part of its processing of the transfer Application. Information in these documents revealed IP has obtained other Federal-type NPDES permits for other companies at several other facilities. The Department was familiar with IP's local management at the Cantonment facility when it processed the transfer Application. IP brings considerable "capability and talent" to the mill. The Department performed inspections during the last six (6) months and was familiar with the facility and wastewater system. IP is an international company with greater financial resources than Champion. It has approximately $30 billion in annual sales. Champion, in comparison, generated about $5 billion a year. It is clear that that the operation of the mill and the facility would have less capital and financial support without IP. Since June 2000, IP has worked with the Department in a continuation of the Department's concept of relocating the facility's discharge to wetlands. The plan considers removal of the facility's treated effluent from the creek to wetlands on IP's land and effectively eliminates it as a point source discharge and removes the discharge from the creek. IP will have a greater ability than Champion to meet permit conditions due to greater financial sources, technical staff, and resources. IP's management is committed to resolving water quality issues like specific conductance and is willing to resolve outstanding water quality issues in the bay and creek. In the view of the former Northwest District Director who worked on water quality issues at the facility for twelve years ending March 31, 2001, the current plan to discharge to wetlands will be implemented and allow compliance with all water quality standards. He also opines that IP has the ability to comply with water quality standards under the plan to discharge to wetlands. In the Department's view, IP has provided reasonable assurances that it has the ability to meet the existing conditions of the permit sought to be transferred. IP Complies with Permit Conditions as Evidence of Ability According to the Department's expert, Mr. William A. Evans, a professional engineer with a Master's degree in civil engineering and an expert in environmental engineering, there have been no verifiable violations of permit conditions and no exceedances since January 2000, before IP took over operations of the mill. On the other hand, Mr. Evans, in reviewing a discharge monitoring report for IP for April 2001, advised, during cross-examination, that there appeared to be "an apparent violation, exceedance of the permit" for specific conductance pursuant to the 1500 micromhons per centimeter limit in the EPA's version of the permit. However, the Variance, which is part of the Application, was granted "because there is no practicable means known or available for the adequate control of the pollution involved," i.e., specific conductance. The Department applies the limit of 2500 micromhos per centimeter set forth in the Variance for specific conductance, which is a reasonable interpretation of the permit documents. When the permit documents, including the Variance are read in this light, IP is in compliance with this limit. IP is in compliance with the Consent Order, NPDES permit, and Variance. In making this finding, the undersigned is mindful of Lane's arguments and facts presented. The issue here is not black or white; violation or no violation. As noted by Mr. Evans: This permit is recognized since '89 is [sic] not meeting water quality standards. It has all these documents because it doesn't. And they're still working under those. And the Department agrees with Ms. Lane that they are not meeting water quality standards in the creek. And we're working under these documents to make improvements. And so is Champion and so is IP. But they are not, in our opinion, violating the conditions of the permit. There [sic] are complying with studying it, meeting the interim limits that are set forth in the permit. And that is what the Statutes require when a facility can not meet all the standards of a permit. The Department, while considering the renewal application, has not approved it yet because they have not received reasonable assurances that new permit conditions can be met. Champion, and now IP, are facing the continuing challenge of satisfying, among other requirements, water quality standards, which takes time, money, and know-how. The Department rightly believes that IP can best meet this challenge. The Department's review of the monthly monitoring reports submitted by the mill since Champion was purchased reveals the facility has complied with permit conditions. The most recent monthly report was submitted May 23, 2001, and includes data through April 2001. During inspections at the facility since June 2000, the Department found no violations of permit conditions. The mill, under IP's operation, has not exceeded the fecal coliform conditions of its permit. The mill has no significant contribution to fecal coliform in the creek because it treats its own domestic sewage and meets the fecal coliform limit at the compliance point. Runoff along the creek from agricultural and domestic sources could contribute to fecal and total coliform in the creek. The Department enforces the "more stringent" pH condition in the 1989 TOP and Variance which is controlling over the less stringent standard in the 1983 NPDES permit. The pH limit in the NPDES permit is 6.0-9.0. The Department reasonably interprets the freshwater stream pH rule to mean enforcement is not required if the permittee meets the range in the rule (6.0-8.5), more stringent than the 9.0 limit in the NPDES permit. The facility's pH data satisfies this range. If the Department were to enforce a limit of 6.5, instead of 8.5, IP has the ability to meet the lower limit by installing one of several available technologies to control the pH levels. IP's current proposal includes one of these technologies. The biological integrity provision in the Consent Order requires studies on biological components of the creek and pH impacts this condition. Permit Conditions Affecting the Creek and Bay The permit does not require the facility to meet all the minimum surface water quality standards of Chapter 62-302, Florida Administrative Code, in the creek and bay. That is because of the relief mechanisms in the Consent Order, TOP, NPDES permit, and Variance. The Consent Order provides a time frame for the facility to come into compliance with water quality standards in the creek and bay. In terms of the Consent Order, the Department considers IP to be at the paragraph 14.A. step of the compliance schedule since the Department has not yet "resolved or agreed on the final corrective action required under this [C]onsent [O]rder." The Department considers the facility to be in compliance with permit conditions because it is "working under a complying [sic] schedule and an order or a temporary operating permit." See Finding of Fact 49. As long as IP is meeting the "interim limits that are set forth in the permit," it is not violating conditions of the permit. The Department is aware of water quality exceedances from the standards in the creek and bay caused by the mill. This data was reported in the "fifth year surveys." This information serves as a basis for making improvements and finding "a new solution for the effluent as required by the consent order." See Finding of Fact 49. Proposal for Joint Project with ECUA IP and the ECUA are working with the Department on a plan than would result in the discharge of IP's treated effluent to wetlands, thereby removing the effluent from the creek. IP's financial capability, size, and technical human resources make this plan feasible. IP will propose a plan to satisfy the Consent Order which consists of three parts: upgrading IP's industrial wastewater treatment facility; allowing ECUA to locate an advanced domestic wastewater treatment plant on its land; and disposing the treated effluent from both facilities to wetlands on IP's land through a pipeline. The proposed plan to discharge the facility's treated effluent to wetlands is a suitable solution that will allow the mill to meet minimum water quality standards. Lane has no objection to the plan to discharge to wetlands. It will resolve all her water quality issues. She believes the plan, similar to a prior plan, is "feasible." Standing and Improper Purpose Lane admits the Department is not making any changes to existing permit conditions before transferring it to IP. Lane agrees that changing the name on the permit from Champion to IP has no adverse affect on her. Lane brought this proceeding because she is dissatisfied with the manner in which the Department is enforcing conditions in the facility's permit. According to Lane, "They haven't done their duty." Her main complaints are with the Department's failure to enforce the permit conditions and the lack of a permit that makes the permit holder comply with Florida law. Lane feels that Champion violated permit conditions in the past, and IP is currently violating permit conditions and, as a result, the permit should not be transferred because a decision to transfer is an implicit finding of compliance. In this light, Lane argues that past performance can be an indication of future ability or lack thereof. Lane acknowledges that in order to add conditions to the existing permit, the Department must provide notice to the mill and give it a chance to meet the proposed conditions. She further admits the Department has not provided such notice. Lane proved that the environmental situation attending Champion's, and now IP's, operation of the mill and the wastewater facility has been and is less than optimum and in need of positive changes. The Department agrees and so does IP. Lane's personal observations of the condition of the creek and bay are documented. However, Lane did not prove that she will suffer an "injury in fact" if the permit and related documents are transferred to IP. Lane is not otherwise substantially affected by the Department's decision to approve the transfer. Lane's evidence did not rebut IP and the Department's proof that IP has the ability to comply with the permit conditions. The preponderance of the evidence shows that the environment in and around the mill and the facility has a better opportunity for improvement if IP takes control of the mill and facility. On the other hand, based on this record, Lane did not bring this case for an improper purpose.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that a final order be rendered as follows: Lane lacks standing to challenge the transfer of industrial wastewater permit number FL0002526-002-IWF/MT to IP because Lane did not prove that her substantial interests were being determined by the Department's transfer of the permit from Champion to IP; IP provided reasonable assurances it has the ability to comply with the conditions of industrial wastewater permit number FL0002526-002-IWF/MT; IP has complied with the conditions of industrial wastewater permit number FL0002526-002-IWF/MT, as the Department construes those conditions, since assuming control of the mill on January 1, 2001; and Lane did not participate in this administrative proceeding for an improper purpose. DONE AND ENTERED this 24th day of August, 2001, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of August, 2001. COPIES FURNISHED: Jacqueline M. Lane 10738 Lillian Highway Pensacola, Florida 32506 Terry Cole, Esquire Patricia A. Renovitch, Esquire Oertel, Hoffman, Fernandez & Cole, P.A. Post Office Box 1110 301 S. Bronough Street, Fifth Floor Tallahassee, Florida 32302-1110 Craig D. Varn, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy C. Carter, Agency Clerk Office of General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Teri L. Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 David B. Struhs, Secretary Department of Environmental Protection 3900 Commonwealth Boulevard The Douglas Building Tallahassee, Florida 32399-3000

Florida Laws (6) 120.569120.57120.595403.061403.088403.0885 Florida Administrative Code (3) 62-302.53062-4.12062-620.340
# 5
ROOKERY BAY UTILITIES, INC. (PRISCILLA SPADE) vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 96-001318 (1996)
Division of Administrative Hearings, Florida Filed:Naples, Florida Oct. 10, 1996 Number: 96-001318 Latest Update: Jun. 20, 1997

The Issue The issue is whether Petitioner is entitled to an operating permit for an existing domestic wastewater treatment facility operating in Naples.

Findings Of Fact On May 10, 1991, Respondent issued Petitioner a five- year permit to operate a 0.3 million gallon per day (GPD) domestic wastewater treatment plant known as the Rookery Bay facility in Naples. This permit, which is number DO11-187204, allowed Petitioner to operate an extended aeration plant, using chlorine for basic disinfection and disposing of the reclaimed water in two percolation ponds. The 1991 permit required Petitioner to allow Respondent access to the facility for inspections at reasonable times, notify Respondent of any violations of any permit conditions, maintain total chlorine residual of at least 0.5 milligrams per liter (mg/L) of effluent sample after at least 15 minutes’ contact time at maximum daily flow, maintain annual average effluent quality values for carbonaceous biochemical oxygen demand (CBOD) and total suspended solids (TSS) of not more than 20 mg/L of effluent sample with maximum effluent quality concentrations of 60 mg/L in any single effluent sample, maintain a monthly average effluent quality value for fecal coliform of not more than 200 per 100 ml of effluent sample with a maximum effluent quality value of 800 per 100 ml in any single effluent sample, notify Respondent of any discharge from the percolation pond overflows, and monitor influent loading to the facility and apply for a permit modification if the monthly average influent flows approach or exceed the design capacity of 0.3 MGD or if the facility violates treatment standards. Respondent also issued Petitioner a five-year permit to operate a 0.15 GPD domestic wastewater treatment plant at the Rookery Bay facility. This permit, which is number DO11-167093, allowed Petitioner to operate a contact stabilization process plant. On December 29, 1995, Petitioner submitted a renewal application for permit number DO11-167093. Although the permit number references the smaller tank, the renewal application requests a permitted capacity of 0.3 MGD. By Notice of Permit Denial dated February 9, 1996, Respondent denied the permit application on the ground that Petitioner could not provide reasonable assurance that it would operate the facility in compliance with state standards based on a “continued and long standing pattern of noncompliance and violation of . . . rules and standards.” Petitioner’s operation of the Rookery Bay treatment plant has been poor. Respondent has brought an enforcement action against Petitioner, which signed a consent final judgment in January 1994. The consent final judgment required Respondent to pay $4500 in civil penalties. As it applied to the Rookery Bay facility, the consent final order required Petitioner to evaluate the facility to discover the causes of past violations and modify the facility to eliminate these violations. But Petitioner has not complied with material provisions of the consent final judgment. Petitioner’s operator has been held in contempt of court several times for violations at Rookery Bay and a nearby smaller treatment facility known as Port au Prince. Petitioner has several times refused Respondent’s representatives reasonable access to the Rookery Bay facility. At least twice, Petitioner has failed to advise Respondent of equipment failures that resulted in violations of treatment standards. On January 11, 1995, Petitioner cut off the power for several hours to a lift station pump serving a nearby a condominium complex. Predictably, the sewage backed up and overflowed into the street. Petitioner failed to restore the power timely or remove the overflowed sewage. On several occasions, raw or inadequately treated sewage has leaked from the tanks at the Rookery Bay facility. Petitioner has failed to eliminate this problem over the course of its five-year operating permit. On numerous occasions, Respondent’s representatives have detected violations of effluent quality. These violations have arisen inadequate detention time in the chlorine contact chamber. Consequently, the TSS and CBOD levels have repeatedly exceeded permitted standards. The parties dispute the adequacy of the capacity of the Rookery Bay facility. There is considerable evidence, including one statement in the application, that suggests that the facility’s capacity is seriously inadequate. Either the capacity of the Rookery Bay is, and has been, inadequate--in which case at least some of the violations are attributable to overcapacity operation--or, if the facility has had adequate capacity, the operational competence of Petitioner is below the minimum level necessary to provide reasonable assurance of proper operations at this facility in the future. Most likely, the Rookery Bay facility lacks adequate capacity, at least part of the year, and Petitioner lacks the minimum requisite competence to operate the facility in a responsible manner. The strongest evidence in the record suggests that the Rookery Bay facility serves, during peak season, 1500 mobile home connections and 400 apartment connections. These connections generate about 377,500 GPD of raw sewage. A slightly lower value is probable after consideration of the likely presence of recreational vehicles among the mobile home count. But this reduction, even without adjustment for dry-season infiltration and inflow, would not yield sufficient savings in raw sewage as to provide reasonable assurance that the Rookery Bay facility has adequate capacity to serve the present demand or adequate capacity to serve the demand projected over the five-year term of the permit that Petitioner seeks. Even if one were to credit Petitioner’s volume-to- capacity calculations, the results fail to constitute reasonable assurance of violation-free operation of the Rookery Bay facility. Petitioner's calculations leave little if any margin for error at present demand levels, and, given Petitioner’s singularly poor operating history at this facility, these calculations provide poor assurance of compliant operation of this troubled facility.

Recommendation Based on the foregoing, it is RECOMMENDED that the Department of Environmental Protection enter a final order denying Petitioner’s renewal application for a domestic wastewater treatment operating permit for the Rookery Bay facility. DONE AND ORDERED in Tallahassee, Florida, this 9th day of May, 1997. ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 9th day of May, 1997. COPIES FURNISHED: Sanford M. Martin 2500 Airport Road, Suite 315 Naples, Florida 34112-4882 Thomas I. Mayton, Jr. Assistant General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Perry Odom General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (4) 120.57403.085403.087403.088 Florida Administrative Code (1) 62-620.320
# 6
LANIGER ENTERPRISES OF AMERICA, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 05-001599 (2005)
Division of Administrative Hearings, Florida Filed:Stuart, Florida May 04, 2005 Number: 05-001599 Latest Update: Feb. 22, 2007

The Issue The issue in this case is whether Respondent Laniger Enterprises of America, Inc. (Laniger), is entitled to the renewal of its domestic wastewater facility permit that was denied by Petitioner Department of Environmental Protection (Department).

Findings Of Fact The Parties The Department is the administrative agency of the State of Florida having the power and duty to protect Florida's air and water resources and to administer and enforce the provisions of Chapter 403, Florida Statutes (2005),1 and the rules promulgated in Florida Administrative Code Title 62. Laniger is a Florida corporation that owns and operates the WWTP that is the subject of this case, located at 1662 Northeast Dixie Highway, Jensen Beach, Martin County, Florida. The WWTP is referred to in the Department permit documents as the Beacon 21 WWTP. The WWTP Laniger acquired the WWTP in 1988 in a foreclosure action. At that time, the WWTP was in a "dilapidated" condition and was operating under a consent order with the Department. After acquiring the WWTP, Laniger brought it into compliance with the Department's requirements. Laniger's WWTP is commonly referred to as a "package plant."2 The WWTP's treatment processes are extended aeration, chlorination, and effluent disposal to percolation ponds. The WWTP does not have a direct discharge to surface water. It was permitted to treat 99,000 gallons per day (gpd) of wastewater. Its average daily flow during the past year was about 56,000 gallons. The east side of the WWTP site is adjacent to Warner Creek. On the north side of the WWTP site, an earthen berm separates the WWTP's percolation ponds from a drainage ditch that connects to Warner Creek. Warner Creek is a tributary to the St. Lucie River. The St. Lucie River is part of the Indian River Lagoon System. The Indian River Lagoon Act In 1989, the St. Johns River Water Management District and the South Florida Water Management District jointly produced a Surface Water Improvement and Management (SWIM) Plan for the Indian River Lagoon System ("the lagoon system"). For the purpose of the planning effort, the lagoon system was defined as composed of Mosquito Lagoon, Indian River Lagoon, and Banana River Lagoon. It extends from Ponce de Leon Inlet in Volusia County to Jupiter Inlet in Palm Beach County, a distance of 155 miles. The SWIM Plan identified high levels of nutrients as a major problem affecting water quality in the lagoon system. Domestic wastewater was identified as the major source of the nutrients. The SWIM Plan designated 12 problem areas within the lagoon system and targeted these areas for "research, restoration and conservation projects under the SWIM programs." Department Exhibit 2 at 11-13. Neither Warner Creek nor the area of the St. Lucie River that Warner Creeks flows into is within any of the 12 problem areas identified in the SWIM Plan. With regard to package plants, the SWIM Plan stated: There are numerous, privately operated, "package" domestic WWTPs which discharge indirectly or directly to the lagoon. These facilities are a continual threat to water quality because of intermittent treatment process failure, seepage to the lagoon from effluent containment areas, or overflow to the lagoon during storm events. Additionally, because of the large number of "package" plants and the lack of enforcement staff, these facilities are not inspected or monitored as regularly as they should be. Where possible, such plants should be phased out and replaced with centralized sewage collection and treatment facilities. Department Exhibit 2 at 64. In 1990, the Legislature passed the Indian River Lagoon Act, Chapter 90-262, Laws of Florida. Section 1 of the Act defined the Indian River Lagoon System as including the same water bodies as described in the SWIM Plan, and their tributaries. Section 4 of the Act provided: Before July 1, 1991, the Department of Environmental Regulation shall identify areas served by package sewage treatment plants which are considered a threat to the water quality of the Indian River Lagoon System. In response to this legislative directive, the Department issued a report in July 1991, entitled "Indian River Lagoon System: Water Quality Threats from Package Wastewater Treatment Plants." The 1991 report found 322 package plants operating within the lagoon system and identified 155 plants as threats to water quality. The 1991 report described the criteria the Department used to determine which package plants were threats: Facilities that have direct discharges to the system were considered threats. Facilities with percolation ponds, absorption fields, or other sub-surface disposal; systems located within 100 feet of the shoreline or within 100 feet of any canal or drainage ditch that discharges or may discharge to the lagoon system during wet periods were considered threats. * * * Facilities with percolation ponds, absorption fields, or other sub-surface disposal systems located more than 100 feet from surface water bodies in the system were evaluated case-by-case based on [operating history, inspection reports, level of treatment, and facility reliability]. Laniger's package plant was listed in the 1991 report as a threat to the water quality of the lagoon system because it was within 100 feet of Warner Creek and the drainage ditch that connects to Warner Creek. Laniger's WWTP was not determined to be a threat based on its wastewater treatment performance. There was no evidence presented that Laniger's WWTP had ever had intermittent treatment process failure, seepage to the lagoon system from effluent containment areas, or overflow during storm events. Those were the concerns related to package plants that were described in the SWIM Plan and the Department's 1991 report. Laniger's WWTP was not determined to be a threat based on evidence that it was causing or contributing to excess nutrients in Warner Creek or in that part of the St. Lucie River nearest to Laniger's WWTP. No evidence was presented that there are excess nutrients in Warner Creek or in that part of the St. Lucie River nearest to Laniger's WWTP. The Department's 1991 report concluded that the solution for package plants threats was to eliminate the package plants and connect their wastewater flow to centralized sewage collection and treatment facilities. To date, over 90 of the 155 package plants identified in the Department's 1991 report as threats to the water quality of the lagoon system have been connected to centralized sewage collection and treatment systems. The 1999 Permit and Administrative Order On August 26, 1999, the Department issued Domestic Wastewater Facility Permit No. FLA013879 to Laniger for the operation of its WWTP. Attached to and incorporated into Laniger's 1999 permit was Administrative Order No. AO 99-008- DW43SED. The administrative order indicates it was issued pursuant to Section 403.088(2)(f), Florida Statutes. That statute pertains to discharges that "will not meet permit conditions or applicable statutes and rules" and requires that the permit for such a discharge be accompanied by an order establishing a schedule for achieving compliance. The administrative order contains a finding that the Beacon 21 WWTP is a threat to the water quality of the lagoon system and that the WWTP "has not provided reasonable assurance . . . that operation of the facility will not cause pollution in contravention of chapter 403, F.S., and Chapter 62-610.850 of the Florida Administrative Code." The cited rule provides that "land application projects shall not cause or contribute to violations of water quality standards in surface waters." The administrative order required Laniger to connect its WWTP to a centralized wastewater collection and treatment [facility] "within 150 days of its availability . . . or provide reasonable assurance in accordance with Chapter 620.320(1) of the Florida Administrative Code that continued operation of the wastewater facility is not a threat to the water quality of the Indian River Lagoon System." As a result of an unrelated enforcement action taken by the Department against Martin County, and in lieu of a monetary penalty, Martin County agreed to extend a force main from its centralized sewage collection and treatment facility so that the Laniger WWTP could be connected. The extension of the force main was completed in April 2003. On April 10, 2003, the Department notified Laniger by letter that a centralized wastewater collection and treatment system "is now available for the connection of Beacon 21." In the notification letter, the Department reminded Laniger of the requirement of the administrative order to connect within 150 days of availability. On May 9, 2003, Laniger's attorney responded, stating that the administrative order allowed Laniger, as an alternative to connecting to the centralized wastewater collection and treatment system, to provide reasonable assurance that the WWTP was not a threat to the water quality of the lagoon system, and Laniger had provided such reasonable assurance. Laniger's attorney also stated, "due to the location of Martin County's wastewater facilities, such facilities are not available as that term is defined in the [administrative] order." On September 29, 2003, the Department issued a warning letter to Laniger for failure to connect to the Martin County force main and for not providing reasonable assurance that the WWTP will not cause pollution in contravention of Chapter 403, Florida Statutes. The Department took no further formal action until it issued the NOV in August 2005. Laniger's challenge of the NOV was consolidated with this permit case. The Permit Renewal Application In an "enforcement meeting" between Laniger and the Department prior to the expiration of 1999 permit, the Department told Laniger that it would not renew Laniger's WWTP permit. Later, when Laniger filed its permit renewal application, the Department offered to send the application back so Laniger would not "waste" the filing fee, because the Department knew it was not going to approve the application. Laniger submitted its permit renewal application to the Department on February 15, 2005. The Department considered Laniger's permit application to be complete, but proceeded to prepare the Notice of Denial without any technical review of the application. The Department denied the application on April 6, 2005. The Department's Notice of Permit Denial stated that the permit was denied because Laniger had not connected to the available centralized wastewater collection and treatment system nor provided reasonable assurance that the WWTP "is not impacting water quality within the Indian River Lagoon System." The record evidence showed that the "reasonable assurance" that would have been necessary to satisfy the Department was more than the reasonable assurance the Department usually requires for package plants, and more than the Department would have required if Laniger's WWTP was 100 feet from Warner Creek. Competent substantial evidence was presented that Laniger's WWTP is capable of being operated in accordance with the statutes and rules of Department generally applicable to package wastewater treatment plants. Laniger's 1999 permit expired on August 25, 2004. Laniger has operated the plant continuously since the permit expired. Whether the Martin County Facility is Available As discussed below in the Conclusions of Law, it is concluded that the Department did not have authority to require Laniger to connect the WWTP to the Martin County force main or to require assurance beyond the reasonable assurance generally required for package treatment plants in order to obtain a permit. However, because considerable evidence and argument was directed to whether the force main was available, that issue will be addressed here. The Martin County force main was not extended to the boundary of the Laniger WWTP site. The force main terminates approximately 150 feet north of the Laniger WWTP site and is separated from the WWTP site by a railroad and railroad right-of-way. Laniger presented undisputed evidence that the cost to connect to the Martin County force main would be approximately $490,000 and that cost was prohibitively high, given the relatively small number of households served by the WWTP. The Laniger WWTP is subject to rate regulation by the Public Service Commission (PSC). Laniger presented evidence suggesting that connection to the Martin County force main would result in rates that would not be approved by the PSC. The evidence was speculative and not competent to support a finding regarding PSC action. The evidence does show, however, that PSC rate regulation was not a factor that the Department considered when it determined that the Martin County force main was available. There is no Department rule that defines when a centralized sewage collection and treatment facility is "available." The determination that the Martin County force main was available to Laniger was made informally by members of the Department's compliance staff in the Department's St. Lucie office. Mr. Thiel testified that he considered the force main to be available because it was "in close proximity" to Laniger's WWTP. However, Mr. Thiel admitted that there is a difference of opinion within DEP as to when a facility is available and reasonable persons could disagree about whether a facility was available. Mr. Thiel thought that the cost to connect is a factor to be considered in determining whether a facility is available, but another Department employee did not think cost should be considered. There was no evidence that the Department took into account Laniger's cost to connect in determining that the Martin County force main was available. The Department simply assumed that the Martin County force main was close enough to the Laniger WWTP site that the cost to Laniger would not be prohibitive. In addition, the Department was aware of other package plants that had connected to centralized sewage collection and treatment facilities that were the same distance or a greater from the package plant, and the Department did not hear from the owners of the package plants that the costs were prohibitive. Timothy Powell of the Department stated that force mains are usually made available by extending the force main so that it is "abutting the property as much as possible." He also stated that he assumed that Martin County would extend its force main under the railroad and to the boundary of the Laniger WWTP site after Laniger agreed to connect. However, there was no evidence to show that this is Martin County's intent, and the Department did not tell Laniger that Laniger did not have to connect to the force main unless Martin County brought the line to the boundary of the WWTP site. If the Department had authority to require Laniger to connect to the Martin County force main when it became available, and in the absence of any rule criteria to determine when a centralized sewage collection and treatment facility is available, the determination would have to be based on reasonableness. Reasonableness in this context must take into account the cost of the connection. Cost is the inherent reason that Laniger was not required to connect to the Martin County centralized sewage collection and treatment facility without regard to whether the facility was available. Laniger showed that the cost of connecting to the force main is unreasonably high due to the need to construct a line beneath the railroad. Therefore, Laniger proved by a preponderance of the evidence that the Martin County force main is not available.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting Laniger Enterprises of America, Inc., a renewal of its wastewater treatment plant operating permit. The permit should contain the same conditions as were contained in the 1999 permit, with the exception of those conditions derived from Administrative Order No. AO 99-008- DW43SED. DONE AND ENTERED this 19th day of September, 2006, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of September, 2006.

Florida Laws (4) 120.569120.57403.087403.088
# 7
FREDDIE PRESSLEY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 82-001609 (1982)
Division of Administrative Hearings, Florida Number: 82-001609 Latest Update: Sep. 27, 1983

Findings Of Fact The Petitioner and his father own and operate the Hiland Park Laundry, a laundromat located at 2431 Highway 231, Panama City, Florida. The Petitioner purchased the business in 1975 and has operated continuously since that time. Wastewater from the laundry, as well as a trailer on the property, passes through a "trickling filter" wastewater treatment facility consisting of primary and secondary settling tanks as well as a trickling filter, thus discharging the treated effluent into a drainage ditch adjacent to the Petitioner's property line, from which drainage ditch the effluent is discharged into Beatty Bayou, a Class III water of the State. The treatment plant and disposal system has been operating since the early 1970's, prior to the Petitioner's purchase of the laundromat and treatment and disposal facility. In 1980, the Petitioner applied for an operating permit for his wastewater treatment facility. Because the discharge from the facility violated the effluent limitations of Chapter 17-6, Florida Administrative Code, the Petitioner was only issued a Temporary Operating Permit on February 2, 1981, which was modified by virtue of the letter from DER on June 8, 1981. The pertinent conditions in the TOP provided that the discharge from the Petitioner's wastewater treatment system must meet the requirements of Chapter 17-6, Florida Administrative Code, as to the quality of its effluent prior to its expiration. Failure to meet that condition would result in a denial of a Permanent Operating Permit and the denial of any further TOP. The pertinent effluent limitation which the TOP (and rules) required the facility to meet was 90 percent removal of biochemical oxygen demand and suspended solids. Since the issuance of the TOP, the discharge from the plant has seldom met those standards. Upon applying for the TOP, which is the subject of this proceeding, the Petitioner failed to present any concrete plans for improving the quality of the effluent from his plant. He merely stated his acknowledgment that, although the system does not comply with current DER requirements, that it will be dismantled upon the Bay County Regional Sewage Treatment and Disposal System becoming available at his location. It is not established, however, that there are any current plans to extend public sewer service to the vicinity of the Petitioner's property at the present time. (DER Exhibit 9) Upon the issuance of the Notice of Intent to Deny the request for the TOP, the Petitioner requested a formal proceeding and the cause was set for hearing before the undersigned on September 24, 1982. At the time of the hearing, the parties agreed on the record to a continuance on the basis that the Petitioner would submit within 60 days a plan certified by an appropriate engineer for a design to bring the discharge effluent into compliance with the effluent parameters of Chapter 17-6, Florida Administrative Code. It was suggested at that time to the Petitioner that his plant and system might comply with the permit exemption contained in Rule 17-4.60, Florida Administrative Code, which provides that such plants are exempt from permitting requirements if they incorporate a trickling filter, a sand filter, as well as a drain field. The Petitioner elected to avoid purchasing a sand filter unit inasmuch as a civil engineer he consulted informed him that the purchase and installation price for such a unit would be approximately $17,000.00, with the attendant drain field estimated to cost an additional $13,000.00. It was established contrarily however that because of the actual peak and average flows of the plant which equate to a daily hydraulic loading on the proposed sand filter of 7,000 gallons per day and 6,000 gallons per day, respectively, that a much smaller sand filter would be required, at a much reduced price. Thus, it was established that a figure of $9,000.00 to $10,000.00 would be the appropriate cost of installing the sand filter which would exempt the facility from the permitting requirements. The concrete slab proposed to be used by the Petitioner's engineer at a cost of in excess of $4,000.00 would not be necessary with a properly designed sand filter with underdrains and grated gravel courses. Based upon his own engineer's estimate of approximately $30,000.00 for the required upgrading, the Petitioner informed the Department that he was not able to underwrite such a high expense and would prefer to find some other solution to the problem. As of the date of the hearing, the Petitioner still was desirous of the Department conferring with him to find a less expensive solution to the problem, but failed to adduce any evidence to establish that such a less expensive solution (less than the solution proposed by the Department) existed. During the period the case was held in abeyance for 60 days after the scheduling of the first hearing in September, 1982, during which time the parties had agreed to seek a solution to the problem involving denial of the permit application, and thereafter until the subject hearing, the Petitioner made no substantial efforts to confer with the personnel of DER and attempt to arrive at a feasible solution to the treatment and disposal problem upon which the denial of the permit application was based. Carol Daugherty is a chemist whose firm supplies the Department with the Petitioner's monthly operating reports, and obtains samples of effluent upon which those reports are based. She performs the testing on the samples from the plant's effluent discharge and engages somewhat in operation of the plant. The Petitioner's discharge has consistently failed to comply with the BOD and total suspended solids effluent limitations listed in Rule 17-6.060, Florida Administrative Code, providing for 90 percent removal of those effluent constituents. William Young, accepted expert witness in the field of biology and water quality assessment, visited the site in February, 1982, and in April, 1983, taking water quality samples from a drainage ditch both upstream and downstream of the Petitioner's discharge point. Chemical analysis of the samples reveal that the Class III parameter for bacteriological quality (coliform bacteria) was violated downstream of the discharge point. An imbalance existed in the bayou in natural populations of aquatic flora and fauna establishing there to be violation of permissible nutrient levels in terms of the excessive deposition of nutrients from the Petitioner's plant into the drainage ditch and thence into the bayou. Mr. Pressley's facility is not the only source of discharge into the drainage ditch which discharges into the bayou, but is the primary source of discharge. Rick Bradburn also was accepted as a expert witness in the field of biology and water quality assessment. He has visited the Petitioner's facility on a number of occasions and periodically has reviewed the monthly operational reports supplied by the Petitioner. The Petitioner's effluent, on a regular basis, is characterized by excessive biochemical oxygen demand, excessive total suspended solids and excessive fecal coliform bacteria counts vis-a-vis the standards and the rules cited hereinbelow. The discharge from the Petitioner's facility thus seldom exceeds 85 percent removal of biochemical oxygen demand and suspended solids (over the past 23 months) and is characterized by excessive nutrient deposition in the Class III waters of the State. The Petitioner has known, or should have known, since shortly after February 2, 1981, when the original TOP was issued with the subject condition regarding required upgrading of the plant and disposal system, that additional upgrading would be required in order to render the effluent produced by plant less degradory. Since that time he knew, or should have known, that the failure to take steps to achieve such upgrading of the treatment and effluent disposal system would jeopardize his continued operation of his business. The Petitioner has made little effort to arrive at and submit plans to achieve a more qualitative level of effluent treatment and as of the time of the hearing had not yet submitted a reasonable compliance schedule nor any sort of commitment to construct needed additional treatment facilities, even though the parties do not dispute that the effluent produced by the plant does not meet the required standard of 90 percent removal of biochemical oxygen demand and suspended solids.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence in the record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is, therefore, RECOMMENDED that the application of Freddie Pressley for a Temporary Operating Permit allowing continued operation of a wastewater treatment and disposal facility in Bay County, Florida, be and the same is hereby DENIED. DONE and ENTERED this 23rd day of August, 1983, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 23rd day of August, 1983. COPIES FURNISHED: Freddie Pressley c/o Highland Park Laundry 2431 Highway 231 Panama City, Florida 32405 Dennis R. Erdley, Esquire Department of Environmental Regulation Twin Towers Office Bldg. 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Bldg. 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (2) 120.57403.088
# 8
PHYLLIS PETERMAN vs DEPARTMENT OF HEALTH, 97-004600 (1997)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Oct. 09, 1997 Number: 97-004600 Latest Update: May 26, 1999

The Issue Should Petitioner's application for variance from the standards for onsite sewage treatment and disposal systems be granted?

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: The Department, through its local health units, is the agency in the State of Florida responsible for permitting or granting variances from permitting standards set forth in Chapter 64E-6, Florida Administrative Code, for Onsite Sewage Treatment and Disposal Systems (OSTDS). Sometime around 1970, Petitioner purchased a mobile home park (Park) in Winter Haven, Florida. The Park presently contains 68 spaces for mobile homes, all of which are occupied. The Park is situated due south of Lake Shipp. There are two canals running approximately east and west through the interior of the Park. Another canal borders the Park on the north side. Included with the purchase of the Park was a Sewage Treatment System (STS) which is permitted and regulated by the Department of Environmental Protection and is presently operating at its maximum capacity serving the 68 mobile homes located in the Park. Sometime around 1980, Petitioner purchased a parcel of land (Property) immediately north of, and across a canal (this is the canal that borders the north side of the Park) from, the Park. The Property borders a basin to Lake Shipp. The Property is zoned for mobile home usage and such is the purpose for which Petitioner purchased the Property. Petitioner has designed the Property such that it will accommodate three mobile home lots (Lots numbered 69, 70, and 71) which Petitioner intends to operate as part of the Park. Initially, Petitioner requested approval of the Department of Environmental Protection to connect the new lots to the existing STS. However, since the existing STS was already at capacity, the Department of Environmental Protection denied Petitioner's request to connect the additional three lots to that system. However, the Department of Environmental protection advised Petitioner that it would have no objection to the installation of septic tanks approved by the Department of Health to serve the additional lots. Subsequently, Petitioner proceeded to obtain the necessary approvals from the local governing authorities and a permit from the Department for the installation of septic tanks on the Property. Petitioner was successful in obtaining the necessary approvals from the local governing authorities but was not successful in obtaining a permit for the installation of septic tanks on the Property from the Department. By letter dated July 16, 1997, the Polk County Health Department denied Petitioner's Application for Onsite Sewage Treatment Disposal System Permit for the following reason: "Domestic sewage flow exceeds 10,000 gallons per day." The denial letter also advised Petitioner that she could request a variance through the Variance Review Board or request an administrative hearing pursuant to Chapter 120, Florida Statutes, on the Department's denial of her application for a permit to install septic tanks on the Property. Petitioner elected to file an application for a variance from Section 381.0065(3)(b), Florida Statutes, with the Variance Review Board. By letter dated August 7, 1997, the Department denied Petitioner's application for variance for the following reasons: The Variance Review and Advisory Committee for the Onsite Sewage Treatment and Disposal Program has recommended disapproval of your application for variance in the case of the above reference property. The granting of variances from established standards is for relieving hardships where it can be clearly shown that the public's health will not be impaired and where pollution of groundwater or surface water will not result, where no reasonable alternative exists, and where the hardship was not intentionally caused by the action of the applicant. The advisory committee's recommendation was based on the failure of the information provided to satisfy the committee that the hardship was not caused intentionally by the action of the applicant, no reasonable alternative exists for the treatment of the sewage, or the discharge from the system will not adversely affect the health of the public. I concur with the advisory committee's recommendation and hereby deny your variance request. Subsequently, Petitioner requested and was granted a formal hearing pursuant to Chapter 120, Florida Statutes, on the denial of Petitioner's application for a variance. The Petitioner intends to locate the OSTDS on the Property. The tank and drain field for the OSTDS will be located approximately 125 feet from the basin. The City of Winter Haven's Sewage System is not available to the Property. The Park's existing STS does not have adequate capacity to accept the sewage that will be generated by the Property. There is no publicly-owned or investor-owned sewage system capable of being connected to the plumbing of the Property. Petitioner testified that the estimated cost of increasing the capacity of the Park's Sewage System to accommodate service to the three additional lots was $30,000.00 - $40,000.00. However, Petitioner presented no evidence as to how the estimate was determined. The projected daily domestic sewage flow from the Property is less than 1,500 gallons per acre per day. The Property contains 1.78 acres and there will be less than four lots per acre. In a letter dated October 17, 1997, from W. R. Cover, a professional engineer with Cover Engineering, Inc., Mr. Cover expresses the following opinion: The location of these proposed mobile homes is such that a septic system will not cause adverse effects or impacts on the environment or public health. The unit will be located so as not to significantly degrade groundwater or surface waters. There is no reasonable alternative for the treatment of the sewage in view of the fact that it would be an additional financial burden to attempt to connect these units to the existing sewage treatment plant Mr. Cover did not testify at the hearing. However, the letter was received as evidence without objection from the Department. Petitioner has failed to present sufficient evidence to show that: (a) no reasonable alternative exists for the treatment of the sewage, and (b) the discharge from the Onsite Sewage Treatment and Disposal System will not adversely affect the health of the applicant or the public or significantly degrade groundwater or surface waters.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department of Health enter a final order denying Petitioner's application for variance from the requirements of Section 381.0065, Florida Statutes and Chapter 64E-6, Florida Administrative Code. DONE AND ENTERED this 30th day of March, 1999, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6947 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 30th day of March, 1999. COPIES FURNISHED: Angela T. Hall, Agency Clerk Department of Health 2020 Capital Circle, Southeast Bin A02 Tallahassee, Florida 32399-1703 Dr. Robert G. Brooks, Secretary Department of Health 2020 Capital Circle, Southeast Bin A00 Tallahassee, Florida 32399-1701 Pete Peterson, General Counsel Department of Health 2020 Capital Circle, Southeast Bin A02 Tallahassee, Florida 32399-1701 Robert J. Antonello, Esquire Antonello, Fegers and Cea Post Office Box 7692 Winter Haven, Florida 33883-7692 Roland Reis, Esquire Department of Health 1290 Golfview Avenue, 4th Floor Bartow, Florida 33830-0293

Florida Laws (2) 120.57381.0065 Florida Administrative Code (2) 28-106.21664E-6.002
# 9
HY KOM DEVELOPMENT COMPANY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 89-002957 (1989)
Division of Administrative Hearings, Florida Number: 89-002957 Latest Update: Oct. 12, 1992

Findings Of Fact On or about December 28, 1987 Hy Kom filed with the Department an application for a permit to construct a .0126 MGD Advanced Waste Water Treatment Plant on Emerson Point, Snead Island in Manatee County. The proposed waste water treatment plant would discharge effluent into the waters of Terra Ceia Bay in Manatee County. The proposed waste water treatment plant would discharge effluent into the waters of Tampa Bay in Manatee County. The proposed waste water treatment plant would discharge effluent into the waters of Manatee River in Manatee County. The waters of Terra Ceia Bay have been designated Outstanding Florida Waters (OFW) by the Department. On or about April 27, 1989 the Department issued a Notice of Permit Denial concerning Hy Kom's permit application. The parties stipulate the Intervenor, Manasota-88, has standing to intervene as a party Respondent and to object to the issuance of the permit. Petitioner's evidence can best be summarized by what was not submitted. First, the expert witness called to identify the application had not prepared any part of the application or verified any of the studies presented therein. Similarly Petitioner's expert on the proposed treatment plant did not testify that Petitioner was committed to using this plant, or that the construction of the plant and the operation of the plant would comply with statutory and rule requirements. The only witness called by Petitioner to testify to the effect the discharge from the proposed advanced waste water treatment plant would have on the receiving waters was also Respondent's expert; and this witness testified that the effluent discharge from this proposed plant would have an adverse effect on the receiving waters, would seriously degrade the receiving waters as a nursery habitat for both crustacea and fishes endemic to the area, and that no reasonable assurances that this would not happen were ever presented by the Petitioner. This witness further testified that no discharge into these receiving waters would be acceptable not only because of the nitrogen level (which was the most significant reason for denying the permit) but also because even a discharge of absolutely pure water would upset the salinity of the receiving waters at the critical time the receiving waters act as a marine nursery.

Recommendation It is RECOMMENDED that a Final Order be entered denying the application of Hy Kom Development Company, for a permit to construct and operate an advanced waste water treatment facility at Emerson Point, Snead Island, Manatee County, Florida. DONE and ORDERED this _15th_ day of September, 1992 in Tallahassee, Leon County, Florida. COPIES FURNISHED: JAMES W. STARNS ESQ 501 GOODLETTE RD SUITE D-100-24 NAPLES FL 33940 W DOUGLAS BEASON ESQ ASST GENERAL COUNSEL K. N. AYERS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this _15th_ day of September, 1992. DEPT OF ENVIRONMENTAL REGULATION 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400 THOMAS W REESE ESQ 123 EIGHTH ST N ST PETERSBURG FL 33701 DANIEL H THOMPSON ESQ GENERAL COUNSEL DEPT OF ENVIRONMENTAL REGULATION 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400 CAROL BROWNER SECRETARY DEPT OF ENVIRONMENTAL REGULATION 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400