SUMTER CITIZENS AGAINST IRRESPONSIBLE DEVELOPMENT, INC.; KENNETH ROOP; AUBREY VARNUM; AND T. DANIEL FARNSWORTH vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND VILLAGES OF LAKE-SUMTER, INC., 02-001123 (2002)
Division of Administrative Hearings, Florida Filed:Bushnell, Florida Mar. 20, 2002 Number: 02-001123 Latest Update: Aug. 12, 2002

The Issue Whether proposed Water Use Permits Nos. 20012236.000 (the Potable Water Permit) and 20012239.000 (the Irrigation Permit) and proposed Environmental Resource Permit No. 43020198.001 (the ERP) should be issued by the Respondent, Southwest Florida Water Management District (the District).

Findings Of Fact The Parties The individual Petitioners, Farnsworth, Roop, and Varnum are all Florida citizens and residents of Sumter County. None of the individual Petitioners offered any evidence relating to direct impacts that the ERP would have on their property. With respect to the Potable Water and Irrigation Permits, anecdotal testimony was presented by Petitioners and Wing and Weir relating to well failures and sinkholes in the area. Two Petitioners, Roop and Varnum, live in close proximity to the property encompassed by the three permits. Petitioner Farnsworth’s property is approximately three and a half miles from the project boundary. Wing and Weir live approximately four and a half to five and 18 miles from the project site, respectively. SCAID is a Florida not-for-profit corporation that has approximately 130 members. Farnsworth, the president of SCAID, identified only Roop and Varnum as members who will be directly affected by the activities to be authorized by the permits. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries. The Utility and the Authority are limited liability companies, of which the Villages Inc. is the managing partner. The Villages Inc. is a Florida corporation. The Utility, which will serve as a provider of potable water, is regulated by the Public Service Commission, while the Authority which will provide irrigation water, is not. The Villages Inc., Development The Villages Inc. is a phased, mixed use, retirement community, which is located at the intersecting borders of Lake, Marion, and Sumter Counties. Development has been on going since at least 1983, with a current planning horizon of the year 2019. Currently, there are 15,362 constructed dwelling units in the built-out portion of the Villages Inc. that are located in Lake County and the extreme northeast corner of Sumter County. The portion located in Marion County is 60 percent complete, with 750 homes completed and another 600 under construction. Approximately another 22,000 residences are planned for development in Sumter County by the year 2012, with an additional 10,200 by the year 2019. However, the Potable Water and Irrigation Permits are only for a six-year duration, and the ERP has a duration of only six years. None of the permits authorize development activities beyond that time frame. Generally speaking, the three permits at issue include an area owned by the Villages Inc. that lies in northeast Sumter County South of County Road 466 and North of County Road 466A. However, it is not projected that this entire area will be built-out during the terms of three proposed permits. Area Hydrology and Topography In the area of the Villages Inc., there is a layer of approximately five to ten feet of sand at the land surface, which is underlain by ten to 70 feet of a clayey sand. Both of these constitute the surficial aquifer and are extremely leaky, allowing water to percolate easily through to a lower layer. Except in the vicinity of Lake Miona, there is no water in the surficial aquifer except after rainfall events. The clayey sand layer is underlain by the Upper Floridan, a limestone unit. The top of this limestone layer ("the top of the rock") occurs at fluctuating depths of between 30 and 70 feet. At approximately 350 to 400 feet below the land surface, there begins a transition to a denser unit that serves as a confining layer between the Upper Floridan production zone and the Lower Floridan production zone. This confining layer, which was confirmed by drilling at three locations in the Villages Inc. is approximately 150 feet thick in the area of the Villages Inc. Another transition, this time to a less dense formation, begins at approximately 550 to 600 feet, which is considered the top of the Lower Floridan production zone. While testing conducted on the project site indicated almost no leakage between the Upper and Lower Floridan production zones, it is generally known by experts that there is some exchange of water between the two layers. Both the Upper and the Lower Floridan contain water that meets potable water standards and both are considered water production zones. The water quality of the two zones is not significantly different. The project area is prone to karst activity, that is, the formation of sinkholes. Sinkholes are formed as a result of the collapse of the overburden above subsurface cavities which have been formed through a very gradual dissolution of limestone, thus resulting in a "sink" at the land surface. Surface water bodies in the area include Lake Miona, Black Lake, Cherry Lake, and Dry Prairie, as well as several other small wetlands. The Potable Water and Irrigation Permits The potable water permit is for the withdrawal from the Upper Floridan Aquifer of 1.164 million gallons of water per day (MGD), on an annual average, for potable use in residences and both commercial and recreational establishments. It also limits the maximum withdrawal during peak months to 2.909 MGD. The Irrigation Permit is for the withdrawal from the Lower Floridan Aquifer of 2.850 MGD, on an annual average, for use in irrigation. The peak month usage rate permissible under the proposed permit would be 9.090 MGD. Water withdrawal under the Irrigation Permit will be used for the irrigation of residential lawns, common areas, commercial landscaping, and golf courses. Modeling of Drawdowns In assessing the impacts of proposed water withdrawals from an aquifer, District personnel considered effects on the aquifers and on-surface water features in the area. Computer- generated models of the predicted effects of the Potable Water and Irrigation Permits withdrawals provided one of the principal bases for this assessment. The primary geologist assigned to review the permit applications reviewed two of the models submitted by the Utility and the Authority (jointly the WUP Applicants) and ran one personal model of her own in order to predict the effects of the proposed withdrawals on the aquifers, as well as on any wetlands and other surface water bodies. In particular, the models predict both the vertical and horizontal extent to which the withdrawals may lower the level of water within the aquifers and in-surface waters under various conditions. One of the models submitted by the WUP Applicants predicted drawdowns during a 90-day period of no rainfall while the other predicted the impacts of the withdrawals over the life of the permits, considered cumulatively with the effects of withdrawals from the already-existing Villages' development in Sumter, Marion, and Lake Counties. The District’s geologist modeled the impacts of the withdrawals over the life of the permits and included the cumulative effects of all of the current Villages' withdrawals in Sumter County. All of these models included the combined effects of both the proposed Potable Water and the Irrigation Permits. Based upon these models, it is concluded that there will be no significant drawdowns as a result of the withdrawals authorized by the proposed water use permits. Specifically, the only predicted drawdown in the surficial aquifer (0.25 feet of drawdown) is in an area where there are no natural surface water features. Drawdown in the Upper Floridan is predicted at between 0.1 and 0.2 feet, while the drawdown in the Lower Floridan is predicted at a maximum of 1.5 feet. These minor drawdowns are not expected to cause any adverse impacts. Transmissivity is the rate at which water moves horizontally through the aquifer. In areas with high transmissivity, the results of water withdrawals from an aquifer will generally be low in magnitude, but broad in lateral extent. Water withdrawals from areas of low transmissivity will result in cones of depression that are more limited in lateral extent, but steeper vertically. The use of too high a transmissivity rate in a model, would overpredict the horizontal distance of the drawdowns caused by withdrawals, but would underpredict the vertical drawdown in the immediate vicinity of the withdrawal. Conversely, use of too low a transmissivity would over-predict the effects in the immediate vicinity of the withdrawal but underpredict the lateral extent of the drawdown. The WUP Applicants’ models used a transmissivity value for the Lower Floridan Aquifer of 100,000 feet squared per day ("ft.2/d'). The WUP Applicants’ consultant derived the transmissivity values from a regional model prepared by the University of Florida. The regional model uses a transmissivity value for the entire region of 200,000 ft.2/d for the Lower Floridan. While that transmissivity is appropriate for assessing large-scale impacts, on a more localized level, the transmissivity of the aquifer may be lower. Therefore, the WUP Applicants’ consultant met with District representatives and agreed to use a value half that used in the University of Florida model. A similar approach was used for the transmissivity value used in modeling effects in the Upper Floridan. Notably, specific transmissivity values recorded in four wells in the Villages Inc. area were not used because two of these wells were only cased to a depth of just over 250 feet, with an open hole below that to a depth of 590 feet. Thus, the transmissivity measured in these wells reflect conditions in the confining layer at the immediate location of the wells - not the transmissivity of the Lower Floridan production zone. Further, site-specific information on transmissivity, measured during pump tests at individual wells, does not correlate well to the transmissivity of the aquifer, even at short distances from the well. Transmissivities measured at individual wells are used to determine the depth at which the pump should be set in the well, not to determine the transmissivity of the aquifer. Thus, the use of transmissivities derived from the regional model, but adjusted to be conservative, is entirely appropriate. Moreover, using a transmissivity in her modeling of the project impacts of 27,000 ft.2/d for the Lower Floridan Aquifer, the district geologist’s model predicted no adverse impacts. Leakance is the measure of the resistance of movement vertically through confining units of the aquifer. The leakance value used by the District for the confining layer between the Upper and Lower Floridan was taken from the University of Florida model. Tests conducted on the site actually measured even lower leakance values. Thus, the evidence establishes that the leakance value used in the WUP Applicants’ and the District’s modeling for the Floridan confining layer was reasonable and appropriate. Competent, substantial evidence also establishes that the leakance value used for Lake Miona was reasonable. The WUP Applicants submitted to the District substantial data, gathered over several years, reflecting the balance of water flowing into Lake Miona and the lake’s levels in relation to the potentiometric surface. This documentation verified the leakance value used for Lake Miona in the modeling. Finally, the District modeling used appropriate boundary condition parameters. The District modeling used what is known as the "constant head" boundary and assumes the existence of water generated off-site at the boundaries. Such a boundary simulates the discharge of the aquifer at a certain level. The use of constant head boundaries is an accepted practice. The modeling conducted on behalf of the District and the Applicants provides a reasonable assurances that the Potable Water and Irrigation Permits will not cause adverse water quality or quantity changes to surface or groundwater resources, will not cause adverse environmental impacts to natural resources, and will not cause pollution of the aquifer. Furthermore, because the predicted drawdowns are so insignificant, reasonable assurances have been provided that the withdrawals will not adversely impact existing off-site land uses or existing legal withdrawals. The modeling also provides reasonable assurances that the withdrawals will not be harmful to the water resources of the District. Moreover, monitoring requirements included in the proposed Potable Water and Irrigation Permits provide additional reasonable assurance that – should the withdrawal effects exceed those predicted by the modeling – such effects are identified and necessary steps are taken to mitigate for any potential impacts. The District has reserved the right to modify or revoke all or portions of the water use permits under certain circumstances. Specifically, the proposed Potable Water Permit requires a monitoring plan that includes the following pertinent provisions: There shall be no less than three control wetland and ten onsite wetland monitoring sites; A baseline monitoring report, outlining the current wetland conditions; * * * A statement indicating that an analysis of the water level records for area lakes, including Miona Lake, Black Lake, Cherry Lake, Lake Deaton and Lake Griffin, will be included in the annual report; A statement indicating that an analysis of the spring flow records for Gum Spring, Silver Spring, and Fenney Spring, will be included in the annual report; * * * Wildlife analyses for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods to determine success of the mitigation; A mitigation plan for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods and thresholds to determine success of the mitigation; An annual report of an analysis of the monitoring data . . . . Similar provisions are included in the proposed irrigation permit. The WUP Applicants, in conjunction with the District, have developed sites and methodologies for this monitoring. Reasonable Demand The water to be withdrawn under the proposed Potable Water Permit will serve 10,783 people. This total results from the simple multiplication of the number of residences to be built during the next six years (5,675) by the average number of residents per household (1.9). Those numbers are based upon historical absorption rates within the Villages Inc. development since 1983, an absorption rate that doubles approximately every five years. The Utility proposed a per capita use rate of 108 gallons per day for potable use only. District personnel independently verified that per capita rate, based upon current usage in the existing portions of the Villages Inc. and determined that the rate was reasonable. Based upon the population projections and the per capita rate, the District determined that there is a reasonable demand for the withdrawal of the amount of water, for potable purposes, that is reflected in the Potable Water Permit. The Utility has provided reasonable assurance regarding the Utility’s satisfaction of this permitting criterion. As to the irrigation permit, the Villages Inc. plans, within the next six years, to complete the construction of 1,911 acres of property that will require irrigation. The amount of water originally requested by the Authority for irrigation withdrawals was reduced during the course of the application process at the request of the District. The District determined the reasonable amount of irrigation water needed through the application of AGMOD, a computer model that predicts the irrigation needs of various vegetative covers. Since the Authority intends to utilize treated wastewater effluent as another source of irrigation water, the District reduced the amount of water that it would permit to be withdrawn from the Lower Floridan for irrigation. The District, thus, determined that the Authority would need 1.59 MGD annual average for recreational and aesthetic area irrigation and 1.26 MGD annual average for residential lawn irrigation, for a total of 2.85 MGD. The Villages Inc. also plans to accumulate stormwater in lined ponds for irrigation use. However, unlike its treatment of wastewater effluent, the District did not deduct accumulated stormwater from the amount of water deemed necessary for irrigation. This approach was adopted due to the inability to predict short-term rainfall amounts. The uncontroverted evidence of record establishes reasonable assurances that there is a reasonable demand for the amount of water to be withdrawn under the proposed irrigation permit. Conservation and Reuse Measures Both the Utility and the Authority applications included proposed measures for the conservation and reuse of water. The conservation plan submitted in conjunction with the irrigation permit application provides for control valves to regulate both the pressure and timing of irrigation by residential users; contractual restrictions on water use by commercial users; xeriscaping; and an irrigation control system for golf course irrigation that is designed to maximize the efficient use of water. In addition, in the proposed permits, the District requires the Utility and the Authority to expand upon these conservation measures through such measures as educational efforts, inclined block rate structures, and annual reporting to assess the success of conservation measures. The Authority also committed to reduce its dependence on groundwater withdrawals through the reuse of wastewater effluent, both from the on-site wastewater treatment facility and through contract with the City of Wildwood. Reasonable assurances have been provided that conservation measures have been incorporated and that, to the maximum extent practicable, reuse measures have been incorporated. Use of Lowest Available Quality of Water In addition to the reuse of treated wastewater effluent, the Authority intends to minimize its dependence on groundwater withdrawals for irrigation use through the reuse of stormwater accumulated in lined ponds. Thirty-one of the lined stormwater retention ponds to be constructed by the Villages Inc. are designed as a component of the irrigation system on-site. Ponds will be grouped with the individual ponds within each group linked through underground piping. There will be an electronically controlled valve in the stormwater pond at the end of the pipe that will be used to draw out water for irrigation purposes. These lined stormwater ponds serve several purposes. However, the design feature that is pertinent to the reuse of stormwater for irrigation is the inclusion of additional storage capacity below the top of the pond liner. No groundwater will be withdrawn for irrigation purposes unless the level of stormwater in these lined ponds drops below a designed minimum irrigation level. Groundwater pumped into these ponds will then be pumped out for irrigation. Thus, the use of groundwater for irrigation is minimized. The Authority has met its burden of proving that it will use the lowest quality of water available. With respect to the potable permit, the evidence establishes that there are only minor differences between the water quality in the Upper Floridan and Lower Floridan in this area. The Upper Floridan is a reasonable source for potable supply in this area. Thus, reasonable assurances have been provided by the Utility that it will utilize the lowest water quality that it has the ability to use for potable purposes. Waste of Water In regard to concerns that the design of the Villages Inc.'s stormwater/irrigation system will result in wasteful losses of water due to evaporation from the surface of the lined ponds, it must be noted that there are no artesian wells relating to this project and nothing in the record to suggest that the groundwater withdrawals by either the Utility or the Authority will cause excess water to run into the surface water system. Additionally, the evidence establishes that, to the extent groundwater will be withdrawn from the Lower Floridan and pumped into lined stormwater ponds, such augmentation is not for an aesthetic purpose. Instead, the groundwater added to those ponds will be utilized as an integral part of the irrigation system and will be limited in quantity to the amount necessary for immediate irrigation needs. Finally, the water to be withdrawn will be put to beneficial potable and irrigation uses, rather than wasteful purposes. Under current regulation, water lost from lined stormwater ponds through evaporation is not considered as waste. Thus, the Authority and the Utility have provided reasonable assurances that their withdrawals of groundwater will not result in waste. The ERP The stormwater management system proposed by the Villages Inc. will eventually serve 5,016 acres on which residential, commercial, golf course, and other recreational development will ultimately be constructed. However, the proposed permit currently at issue is preliminary in nature and will only authorize the construction of stormwater ponds, earthworks relating to the construction of compensating flood storage, and wetland mitigation. Water Quality Impacts The stormwater management system will include eight shallow treatment ponds that will be adjacent to Lake Miona and Black Lake and 45 lined retention ponds. Thirty-one of these lined ponds will serve as part of the irrigation system for a portion of the Villages Inc.'s development. All of these ponds provide water quality treatment. The unlined ponds will retain the first one inch of stormwater and then overflow into the lakes. The ponds provide water quality treatment of such water before it is discharged into the lakes. The water quality treatment provided by these ponds provides reasonable assurances that the project will not adversely impact the water quality of receiving waters. While they do not discharge directly to surface receiving waters, the lined retention ponds do provide protection against adverse water quality impacts on groundwater. There will be some percolation from these ponds, from the sides at heights above the top of the liner. However, the liners will prevent the discharge of pollutants through the highly permeable surface strata into the groundwater. The Villages Inc. designed the system in this manner in response to concerns voiced by the Department of Environmental Protection during the DRI process regarding potential pollutant loading of the aquifer at the retention pond sites. Furthermore, by distributing the accumulated stormwater - through the irrigation system - over a wider expanse of vegetated land surface, a greater degree of water quality treatment will be achieved than if the stormwater were simply permitted to percolate directly through the pond bottom. There is no reasonable expectation that pollutants will be discharged into the aquifer from the lined ponds. If dry ponds were used, there would be an accumulation of pollutants in the pond bottom. These measures provide reasonable assurances that there will be no adverse impact on the quality of receiving waters. Water Quantity Impacts With regard to the use of lined retention ponds, as part of the Villages Inc.’s stormwater system and the impact of such ponds on water quantity, the evaporative losses from lined ponds as opposed to unlined ponds is a differential of approximately one (1) inch of net recharge. The acreage of the lined ponds - even measured at the very top of the pond banks - is only 445 acres. That differential, in terms of a gross water balance, is not significant, in view of the other benefits provided by the lined ponds. As part of the project, wetlands will be created and expanded and other water bodies will be created. After rainfalls, these unlined ponds will be filled with water and will lose as much water through evaporation as would any other water body. The design proposed by the Villages Inc., however, will distribute the accumulated stormwater across the project site through the irrigation of vegetated areas. The documentation submitted by the Villages Inc. establishes that the ERP will not cause adverse water quantity impacts. The Villages Inc. has carried its burden as to this permitting criterion. Flooding, Surface Water Conveyance, and Storage Impacts Parts of the project are located in areas designated by the Federal Emergency Management Administration (FEMA) as 100-year flood zones. Specifically, these areas are located along Lake Miona, Black Lake, between Black Lake and Cherry Lake, and at some locations south of Black Lake. Under the District’s rules, compensation must be provided for any loss of flood zone in filled areas by the excavation of other areas. The District has determined, based upon the documentation provided with the Villages Inc.’s application, work on the site will encroach on 871.37 acre feet of the FEMA 100-year flood zone. However, 1,051.70 acre feet of compensating flood zone is being created. The Villages Inc. proposes to mitigate for the loss of flood zone primarily in the areas of Dry Prairie and Cherry Lake. At present, Cherry Lake is the location of a peat mining operation authorized by DEP permit. Mining has occurred at that site since the early 1980s. The flood zone mitigation proposed by the Villages Inc. provides reasonable assurance that it will sufficiently compensate for any loss of flood basin storage. The Villages Inc.'s project provides reasonable assurance that it will neither adversely affect surface water storage or conveyance capabilities, surface or groundwater levels or surface water flows nor cause adverse flooding. Each of the 45 retention ponds to be constructed on-site will include sufficient capacity, above the top of the pond liner, to hold a 100-year/24-hour storm event. This includes stormwater drainage from off-site. In addition, these ponds are designed to have an extra one foot of freeboard above that needed for the 100-year/24-hour storm, thus providing approximately an additional 100 acres of flood storage beyond that which will be lost through construction on-site. Furthermore, the Villages Inc. has proposed an emergency flood plan. In the event of a severe flood event, excess water will be pumped from Dry Prairie, Cherry Lake, and Lake Miona and delivered to the retention ponds and to certain golf course fairways located such that habitable living spaces would not be endangered. Environmental Impacts and Mitigation There are 601 acres of wetlands and surface waters of various kinds in the Villages Inc.’s project area. Forty-one acres of wetlands will be impacted by the work that is authorized under the ERP. Each of these impacted wetlands, along with the extent of the impact, is listed in the ERP. The impacts include both fill and excavation and all will be permanent. When assessing wetland impacts and proposed mitigation for those impacts, the District seeks to ensure that the activities proposed will not result in a net loss of wetland functionality. The object is to ensure that the end result will function at least as well as did the wetlands in their pre-impact condition. Functional value is judged, at least in part, by the long term viability of the wetland. While small, isolated wetlands are not completely without value, large wetland ecosystems – which are less susceptible to surrounding development – generally have greater long-term habitat value. The District’s policy is that an applicant need not provide any mitigation for the loss of habitat in wetlands of less than 0.5 acre, except under certain limited circumstances, including where the wetland is utilized by threatened or endangered species. Some wetlands that will be impacted by the Villages Inc.’s project are of high functional value and some are not as good. The Villages Inc. proposes a variety of types of mitigation for the wetlands impacts that will result from its project, all of which are summarized in the ERP. In all, 331.55 acres of mitigation are proposed by the Villages Inc. First, the District proposes to create new wetlands. Approximately 11 acres of this new wetland will consist of a marsh, which is to be created east of Cherry Lake. Second, it proposes to undertake substantial enhancement of Dry Prairie, a 126-acre wetland. Currently – and since at least the early nineties – Dry Prairie received discharge water from the peat mining operation at Cherry Lake. Without intervention, when the mining operations stop, Dry Prairie would naturally become drier than it has been for several years and would lose some of the habitat function that it has been providing. The Villages Inc.’s proposed enhancement is designed to match the current hydroperiods of Dry Prairie, thus ensuring its continued habitat value. Third, the Villages Inc. has proposed to enhance upland buffers around wetlands and surface waters by planting natural vegetation, thus providing a natural barrier. Placement of these buffers in conservation easements does not provide the Villages Inc. with mitigation credit, since a 25-foot buffer is required anyway. However, the District determined that the enhancement of these areas provided functional value to the wetlands and surface waters that would not be served by the easements alone. Fourth, the Villages Inc. will place a conservation easement over certain areas, including a 1500-foot radius preserve required by the Fish and Wildlife Conservation Commission (FWCC) around an identified eagles’ nest. These areas will also be used for the relocation of gopher tortoises and, if any are subsequently located, of gopher frogs. While the Villages Inc. is also performing some enhancement of this area, it will receive no mitigation credit for such enhancement – which was required to meet FWCC requirements. However, since the conservation easement will remain in effect in perpetuity, regardless of whether the eagles continue to use the nest, the easement ensures the continued, viability of the area’s wetlands and provides threatened and endangered species habitat. In order to provide additional assurances that these mitigation efforts will be successful, the District has included a condition in the proposed permit establishing wetland mitigation success criteria for the various types of proposed mitigation. If these success criteria are not achieved, additional mitigation must be provided. With the above described mitigation, the activities authorized under the ERP will not adversely impact the functional value of wetlands and other surface waters to fish or wildlife. The Villages Inc. has met its burden of providing reasonable assurances relating to this permit criterion. Capability of Performing Effectively The Villages Inc. has also provided reasonable assurances that the stormwater management system proposed is capable of functioning as designed. The retention ponds proposed are generally of a standard-type design and will not require complicated maintenance procedures. In its assessment of the functional capability of the system, the District did not concern itself with the amount of stormwater that the system might contribute for irrigation purposes. Rather, it focused its consideration on the stormwater management functions of the system. The question of the effectiveness of the system for irrigation purposes is not relevant to the determination of whether the Villages Inc. has met the criteria for permit issuance. Consequently, the record establishes that the documentation provided by the Villages Inc. contains reasonable assurances that the stormwater system will function effectively and as proposed. Operation Entity The Villages Inc. has created Community Development District No. 5 (CDD No. 5), which will serve as the entity responsible for the construction and maintenance of the stormwater system. CDD No. 5 will finance the construction through special revenue assessment bonds and will finance maintenance through the annual assessments. Similar community development districts were established to be responsible for earlier phases of the Villages Inc. The ERP includes a specific condition that, prior to any wetlands impacts, the Villages Inc. will either have to provide the District with documentation of the creation of a community development district or present the District with a performance bond in the amount of $1,698,696.00. Since the undisputed testimony at hearing was that CDD No. 5 has, in fact, now been created, there are reasonable assurances of financial responsibility. Secondary and Cumulative Impacts The Villages Inc.’s application also provides accurate and reliable information sufficient to establish that there are reasonable assurances that the proposed stormwater system will not cause unacceptable cumulative impacts upon wetlands or other surface waters or adverse secondary impacts to water resources. The system is designed in a manner that will meet water treatment criteria and there will be no secondary water quality impacts. Further, the use of buffers will prevent secondary impacts to wetlands and wetland habitats and there will be no secondary impacts to archeological or historical resources. In this instance, the stormwater system proposed by the Villages Inc. will function in a manner that replaces any water quantity or water quality functions lost by construction of the system. In its assessment of the possible cumulative impacts of the system, the District considered areas beyond the bounds of the current project, including the area to the south that is currently being reviewed under the DRI process as a substantial deviation. The District’s environmental scientist, Leonard Bartos, also reviewed that portion of the substantial deviation north of County Road 466A, in order to determine the types of wetlands present there. Furthermore, the District is one of the review agencies that comments on DRI and substantial deviation applications. When such an application is received by the District’s planning division, it is routed to the regulatory division for review. The District includes its knowledge of the DRIs in its determination that there are no cumulative impacts. Reasonable assurances have been provided as to these permitting criteria. Public Interest Balancing Test Because the proposed stormwater system will be located in, on, and over certain wetlands, the Villages Inc. must provide reasonable assurances that the system will not be contrary to the public interest. This assessment of this permitting criteria requires that the District balance seven factors. While the effects of the proposed activity will be permanent, the Villages Inc. has provided reasonable assurances that it will not have an adverse impact on the public health, safety, or welfare; on fishing or recreational values; on the flow of water; on environmental resources, including fish and wildlife and surface water resources; or on off-site properties. Furthermore, the District has carefully assessed the current functions being provided by the affected wetland areas. With respect to historical or archeological resources, the Villages Inc. has received letters from the Florida Department of State, Division of Historical Resources, stating that there are no significant historical or archeological resources on the project site that is the subject of this permit proceeding. Thus, the evidence establishes reasonable assurances that the Villages Inc.'s stormwater system will not be contrary to the public interest. Additionally, the District and Applicant presented uncontroverted evidence that the proposed project will not adversely impact a work of the District, and that there are no applicable special basin or geographic area criteria.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is: RECOMMENDED that a final order be entered issuing Water Use Permit Nos. 20012236.000 and 20012239.000 and Environmental Resource Permit No. 43020198.001, in accordance with the District’s proposed agency action. DONE AND ENTERED this 24th day of June, 2002, in Tallahassee, Leon County, Florida. DON W. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of June, 2002.

Florida Laws (5) 120.569120.57373.203380.06403.412
# 1
SUMTER CITIZENS AGAINST IRRESPONSIBLE DEVELOPMENT, INC.; KENNETH ROOP; AND AUBREY VARNUM vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND VILLAGES WATER CONSERVATION AUTHORITY, 02-001124 (2002)
Division of Administrative Hearings, Florida Filed:Bushnell, Florida Mar. 20, 2002 Number: 02-001124 Latest Update: Aug. 12, 2002

The Issue Whether proposed Water Use Permits Nos. 20012236.000 (the Potable Water Permit) and 20012239.000 (the Irrigation Permit) and proposed Environmental Resource Permit No. 43020198.001 (the ERP) should be issued by the Respondent, Southwest Florida Water Management District (the District).

Findings Of Fact The Parties The individual Petitioners, Farnsworth, Roop, and Varnum are all Florida citizens and residents of Sumter County. None of the individual Petitioners offered any evidence relating to direct impacts that the ERP would have on their property. With respect to the Potable Water and Irrigation Permits, anecdotal testimony was presented by Petitioners and Wing and Weir relating to well failures and sinkholes in the area. Two Petitioners, Roop and Varnum, live in close proximity to the property encompassed by the three permits. Petitioner Farnsworth’s property is approximately three and a half miles from the project boundary. Wing and Weir live approximately four and a half to five and 18 miles from the project site, respectively. SCAID is a Florida not-for-profit corporation that has approximately 130 members. Farnsworth, the president of SCAID, identified only Roop and Varnum as members who will be directly affected by the activities to be authorized by the permits. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries. The Utility and the Authority are limited liability companies, of which the Villages Inc. is the managing partner. The Villages Inc. is a Florida corporation. The Utility, which will serve as a provider of potable water, is regulated by the Public Service Commission, while the Authority which will provide irrigation water, is not. The Villages Inc., Development The Villages Inc. is a phased, mixed use, retirement community, which is located at the intersecting borders of Lake, Marion, and Sumter Counties. Development has been on going since at least 1983, with a current planning horizon of the year 2019. Currently, there are 15,362 constructed dwelling units in the built-out portion of the Villages Inc. that are located in Lake County and the extreme northeast corner of Sumter County. The portion located in Marion County is 60 percent complete, with 750 homes completed and another 600 under construction. Approximately another 22,000 residences are planned for development in Sumter County by the year 2012, with an additional 10,200 by the year 2019. However, the Potable Water and Irrigation Permits are only for a six-year duration, and the ERP has a duration of only six years. None of the permits authorize development activities beyond that time frame. Generally speaking, the three permits at issue include an area owned by the Villages Inc. that lies in northeast Sumter County South of County Road 466 and North of County Road 466A. However, it is not projected that this entire area will be built-out during the terms of three proposed permits. Area Hydrology and Topography In the area of the Villages Inc., there is a layer of approximately five to ten feet of sand at the land surface, which is underlain by ten to 70 feet of a clayey sand. Both of these constitute the surficial aquifer and are extremely leaky, allowing water to percolate easily through to a lower layer. Except in the vicinity of Lake Miona, there is no water in the surficial aquifer except after rainfall events. The clayey sand layer is underlain by the Upper Floridan, a limestone unit. The top of this limestone layer ("the top of the rock") occurs at fluctuating depths of between 30 and 70 feet. At approximately 350 to 400 feet below the land surface, there begins a transition to a denser unit that serves as a confining layer between the Upper Floridan production zone and the Lower Floridan production zone. This confining layer, which was confirmed by drilling at three locations in the Villages Inc. is approximately 150 feet thick in the area of the Villages Inc. Another transition, this time to a less dense formation, begins at approximately 550 to 600 feet, which is considered the top of the Lower Floridan production zone. While testing conducted on the project site indicated almost no leakage between the Upper and Lower Floridan production zones, it is generally known by experts that there is some exchange of water between the two layers. Both the Upper and the Lower Floridan contain water that meets potable water standards and both are considered water production zones. The water quality of the two zones is not significantly different. The project area is prone to karst activity, that is, the formation of sinkholes. Sinkholes are formed as a result of the collapse of the overburden above subsurface cavities which have been formed through a very gradual dissolution of limestone, thus resulting in a "sink" at the land surface. Surface water bodies in the area include Lake Miona, Black Lake, Cherry Lake, and Dry Prairie, as well as several other small wetlands. The Potable Water and Irrigation Permits The potable water permit is for the withdrawal from the Upper Floridan Aquifer of 1.164 million gallons of water per day (MGD), on an annual average, for potable use in residences and both commercial and recreational establishments. It also limits the maximum withdrawal during peak months to 2.909 MGD. The Irrigation Permit is for the withdrawal from the Lower Floridan Aquifer of 2.850 MGD, on an annual average, for use in irrigation. The peak month usage rate permissible under the proposed permit would be 9.090 MGD. Water withdrawal under the Irrigation Permit will be used for the irrigation of residential lawns, common areas, commercial landscaping, and golf courses. Modeling of Drawdowns In assessing the impacts of proposed water withdrawals from an aquifer, District personnel considered effects on the aquifers and on-surface water features in the area. Computer- generated models of the predicted effects of the Potable Water and Irrigation Permits withdrawals provided one of the principal bases for this assessment. The primary geologist assigned to review the permit applications reviewed two of the models submitted by the Utility and the Authority (jointly the WUP Applicants) and ran one personal model of her own in order to predict the effects of the proposed withdrawals on the aquifers, as well as on any wetlands and other surface water bodies. In particular, the models predict both the vertical and horizontal extent to which the withdrawals may lower the level of water within the aquifers and in-surface waters under various conditions. One of the models submitted by the WUP Applicants predicted drawdowns during a 90-day period of no rainfall while the other predicted the impacts of the withdrawals over the life of the permits, considered cumulatively with the effects of withdrawals from the already-existing Villages' development in Sumter, Marion, and Lake Counties. The District’s geologist modeled the impacts of the withdrawals over the life of the permits and included the cumulative effects of all of the current Villages' withdrawals in Sumter County. All of these models included the combined effects of both the proposed Potable Water and the Irrigation Permits. Based upon these models, it is concluded that there will be no significant drawdowns as a result of the withdrawals authorized by the proposed water use permits. Specifically, the only predicted drawdown in the surficial aquifer (0.25 feet of drawdown) is in an area where there are no natural surface water features. Drawdown in the Upper Floridan is predicted at between 0.1 and 0.2 feet, while the drawdown in the Lower Floridan is predicted at a maximum of 1.5 feet. These minor drawdowns are not expected to cause any adverse impacts. Transmissivity is the rate at which water moves horizontally through the aquifer. In areas with high transmissivity, the results of water withdrawals from an aquifer will generally be low in magnitude, but broad in lateral extent. Water withdrawals from areas of low transmissivity will result in cones of depression that are more limited in lateral extent, but steeper vertically. The use of too high a transmissivity rate in a model, would overpredict the horizontal distance of the drawdowns caused by withdrawals, but would underpredict the vertical drawdown in the immediate vicinity of the withdrawal. Conversely, use of too low a transmissivity would over-predict the effects in the immediate vicinity of the withdrawal but underpredict the lateral extent of the drawdown. The WUP Applicants’ models used a transmissivity value for the Lower Floridan Aquifer of 100,000 feet squared per day ("ft.2/d'). The WUP Applicants’ consultant derived the transmissivity values from a regional model prepared by the University of Florida. The regional model uses a transmissivity value for the entire region of 200,000 ft.2/d for the Lower Floridan. While that transmissivity is appropriate for assessing large-scale impacts, on a more localized level, the transmissivity of the aquifer may be lower. Therefore, the WUP Applicants’ consultant met with District representatives and agreed to use a value half that used in the University of Florida model. A similar approach was used for the transmissivity value used in modeling effects in the Upper Floridan. Notably, specific transmissivity values recorded in four wells in the Villages Inc. area were not used because two of these wells were only cased to a depth of just over 250 feet, with an open hole below that to a depth of 590 feet. Thus, the transmissivity measured in these wells reflect conditions in the confining layer at the immediate location of the wells - not the transmissivity of the Lower Floridan production zone. Further, site-specific information on transmissivity, measured during pump tests at individual wells, does not correlate well to the transmissivity of the aquifer, even at short distances from the well. Transmissivities measured at individual wells are used to determine the depth at which the pump should be set in the well, not to determine the transmissivity of the aquifer. Thus, the use of transmissivities derived from the regional model, but adjusted to be conservative, is entirely appropriate. Moreover, using a transmissivity in her modeling of the project impacts of 27,000 ft.2/d for the Lower Floridan Aquifer, the district geologist’s model predicted no adverse impacts. Leakance is the measure of the resistance of movement vertically through confining units of the aquifer. The leakance value used by the District for the confining layer between the Upper and Lower Floridan was taken from the University of Florida model. Tests conducted on the site actually measured even lower leakance values. Thus, the evidence establishes that the leakance value used in the WUP Applicants’ and the District’s modeling for the Floridan confining layer was reasonable and appropriate. Competent, substantial evidence also establishes that the leakance value used for Lake Miona was reasonable. The WUP Applicants submitted to the District substantial data, gathered over several years, reflecting the balance of water flowing into Lake Miona and the lake’s levels in relation to the potentiometric surface. This documentation verified the leakance value used for Lake Miona in the modeling. Finally, the District modeling used appropriate boundary condition parameters. The District modeling used what is known as the "constant head" boundary and assumes the existence of water generated off-site at the boundaries. Such a boundary simulates the discharge of the aquifer at a certain level. The use of constant head boundaries is an accepted practice. The modeling conducted on behalf of the District and the Applicants provides a reasonable assurances that the Potable Water and Irrigation Permits will not cause adverse water quality or quantity changes to surface or groundwater resources, will not cause adverse environmental impacts to natural resources, and will not cause pollution of the aquifer. Furthermore, because the predicted drawdowns are so insignificant, reasonable assurances have been provided that the withdrawals will not adversely impact existing off-site land uses or existing legal withdrawals. The modeling also provides reasonable assurances that the withdrawals will not be harmful to the water resources of the District. Moreover, monitoring requirements included in the proposed Potable Water and Irrigation Permits provide additional reasonable assurance that – should the withdrawal effects exceed those predicted by the modeling – such effects are identified and necessary steps are taken to mitigate for any potential impacts. The District has reserved the right to modify or revoke all or portions of the water use permits under certain circumstances. Specifically, the proposed Potable Water Permit requires a monitoring plan that includes the following pertinent provisions: There shall be no less than three control wetland and ten onsite wetland monitoring sites; A baseline monitoring report, outlining the current wetland conditions; * * * A statement indicating that an analysis of the water level records for area lakes, including Miona Lake, Black Lake, Cherry Lake, Lake Deaton and Lake Griffin, will be included in the annual report; A statement indicating that an analysis of the spring flow records for Gum Spring, Silver Spring, and Fenney Spring, will be included in the annual report; * * * Wildlife analyses for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods to determine success of the mitigation; A mitigation plan for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods and thresholds to determine success of the mitigation; An annual report of an analysis of the monitoring data . . . . Similar provisions are included in the proposed irrigation permit. The WUP Applicants, in conjunction with the District, have developed sites and methodologies for this monitoring. Reasonable Demand The water to be withdrawn under the proposed Potable Water Permit will serve 10,783 people. This total results from the simple multiplication of the number of residences to be built during the next six years (5,675) by the average number of residents per household (1.9). Those numbers are based upon historical absorption rates within the Villages Inc. development since 1983, an absorption rate that doubles approximately every five years. The Utility proposed a per capita use rate of 108 gallons per day for potable use only. District personnel independently verified that per capita rate, based upon current usage in the existing portions of the Villages Inc. and determined that the rate was reasonable. Based upon the population projections and the per capita rate, the District determined that there is a reasonable demand for the withdrawal of the amount of water, for potable purposes, that is reflected in the Potable Water Permit. The Utility has provided reasonable assurance regarding the Utility’s satisfaction of this permitting criterion. As to the irrigation permit, the Villages Inc. plans, within the next six years, to complete the construction of 1,911 acres of property that will require irrigation. The amount of water originally requested by the Authority for irrigation withdrawals was reduced during the course of the application process at the request of the District. The District determined the reasonable amount of irrigation water needed through the application of AGMOD, a computer model that predicts the irrigation needs of various vegetative covers. Since the Authority intends to utilize treated wastewater effluent as another source of irrigation water, the District reduced the amount of water that it would permit to be withdrawn from the Lower Floridan for irrigation. The District, thus, determined that the Authority would need 1.59 MGD annual average for recreational and aesthetic area irrigation and 1.26 MGD annual average for residential lawn irrigation, for a total of 2.85 MGD. The Villages Inc. also plans to accumulate stormwater in lined ponds for irrigation use. However, unlike its treatment of wastewater effluent, the District did not deduct accumulated stormwater from the amount of water deemed necessary for irrigation. This approach was adopted due to the inability to predict short-term rainfall amounts. The uncontroverted evidence of record establishes reasonable assurances that there is a reasonable demand for the amount of water to be withdrawn under the proposed irrigation permit. Conservation and Reuse Measures Both the Utility and the Authority applications included proposed measures for the conservation and reuse of water. The conservation plan submitted in conjunction with the irrigation permit application provides for control valves to regulate both the pressure and timing of irrigation by residential users; contractual restrictions on water use by commercial users; xeriscaping; and an irrigation control system for golf course irrigation that is designed to maximize the efficient use of water. In addition, in the proposed permits, the District requires the Utility and the Authority to expand upon these conservation measures through such measures as educational efforts, inclined block rate structures, and annual reporting to assess the success of conservation measures. The Authority also committed to reduce its dependence on groundwater withdrawals through the reuse of wastewater effluent, both from the on-site wastewater treatment facility and through contract with the City of Wildwood. Reasonable assurances have been provided that conservation measures have been incorporated and that, to the maximum extent practicable, reuse measures have been incorporated. Use of Lowest Available Quality of Water In addition to the reuse of treated wastewater effluent, the Authority intends to minimize its dependence on groundwater withdrawals for irrigation use through the reuse of stormwater accumulated in lined ponds. Thirty-one of the lined stormwater retention ponds to be constructed by the Villages Inc. are designed as a component of the irrigation system on-site. Ponds will be grouped with the individual ponds within each group linked through underground piping. There will be an electronically controlled valve in the stormwater pond at the end of the pipe that will be used to draw out water for irrigation purposes. These lined stormwater ponds serve several purposes. However, the design feature that is pertinent to the reuse of stormwater for irrigation is the inclusion of additional storage capacity below the top of the pond liner. No groundwater will be withdrawn for irrigation purposes unless the level of stormwater in these lined ponds drops below a designed minimum irrigation level. Groundwater pumped into these ponds will then be pumped out for irrigation. Thus, the use of groundwater for irrigation is minimized. The Authority has met its burden of proving that it will use the lowest quality of water available. With respect to the potable permit, the evidence establishes that there are only minor differences between the water quality in the Upper Floridan and Lower Floridan in this area. The Upper Floridan is a reasonable source for potable supply in this area. Thus, reasonable assurances have been provided by the Utility that it will utilize the lowest water quality that it has the ability to use for potable purposes. Waste of Water In regard to concerns that the design of the Villages Inc.'s stormwater/irrigation system will result in wasteful losses of water due to evaporation from the surface of the lined ponds, it must be noted that there are no artesian wells relating to this project and nothing in the record to suggest that the groundwater withdrawals by either the Utility or the Authority will cause excess water to run into the surface water system. Additionally, the evidence establishes that, to the extent groundwater will be withdrawn from the Lower Floridan and pumped into lined stormwater ponds, such augmentation is not for an aesthetic purpose. Instead, the groundwater added to those ponds will be utilized as an integral part of the irrigation system and will be limited in quantity to the amount necessary for immediate irrigation needs. Finally, the water to be withdrawn will be put to beneficial potable and irrigation uses, rather than wasteful purposes. Under current regulation, water lost from lined stormwater ponds through evaporation is not considered as waste. Thus, the Authority and the Utility have provided reasonable assurances that their withdrawals of groundwater will not result in waste. The ERP The stormwater management system proposed by the Villages Inc. will eventually serve 5,016 acres on which residential, commercial, golf course, and other recreational development will ultimately be constructed. However, the proposed permit currently at issue is preliminary in nature and will only authorize the construction of stormwater ponds, earthworks relating to the construction of compensating flood storage, and wetland mitigation. Water Quality Impacts The stormwater management system will include eight shallow treatment ponds that will be adjacent to Lake Miona and Black Lake and 45 lined retention ponds. Thirty-one of these lined ponds will serve as part of the irrigation system for a portion of the Villages Inc.'s development. All of these ponds provide water quality treatment. The unlined ponds will retain the first one inch of stormwater and then overflow into the lakes. The ponds provide water quality treatment of such water before it is discharged into the lakes. The water quality treatment provided by these ponds provides reasonable assurances that the project will not adversely impact the water quality of receiving waters. While they do not discharge directly to surface receiving waters, the lined retention ponds do provide protection against adverse water quality impacts on groundwater. There will be some percolation from these ponds, from the sides at heights above the top of the liner. However, the liners will prevent the discharge of pollutants through the highly permeable surface strata into the groundwater. The Villages Inc. designed the system in this manner in response to concerns voiced by the Department of Environmental Protection during the DRI process regarding potential pollutant loading of the aquifer at the retention pond sites. Furthermore, by distributing the accumulated stormwater - through the irrigation system - over a wider expanse of vegetated land surface, a greater degree of water quality treatment will be achieved than if the stormwater were simply permitted to percolate directly through the pond bottom. There is no reasonable expectation that pollutants will be discharged into the aquifer from the lined ponds. If dry ponds were used, there would be an accumulation of pollutants in the pond bottom. These measures provide reasonable assurances that there will be no adverse impact on the quality of receiving waters. Water Quantity Impacts With regard to the use of lined retention ponds, as part of the Villages Inc.’s stormwater system and the impact of such ponds on water quantity, the evaporative losses from lined ponds as opposed to unlined ponds is a differential of approximately one (1) inch of net recharge. The acreage of the lined ponds - even measured at the very top of the pond banks - is only 445 acres. That differential, in terms of a gross water balance, is not significant, in view of the other benefits provided by the lined ponds. As part of the project, wetlands will be created and expanded and other water bodies will be created. After rainfalls, these unlined ponds will be filled with water and will lose as much water through evaporation as would any other water body. The design proposed by the Villages Inc., however, will distribute the accumulated stormwater across the project site through the irrigation of vegetated areas. The documentation submitted by the Villages Inc. establishes that the ERP will not cause adverse water quantity impacts. The Villages Inc. has carried its burden as to this permitting criterion. Flooding, Surface Water Conveyance, and Storage Impacts Parts of the project are located in areas designated by the Federal Emergency Management Administration (FEMA) as 100-year flood zones. Specifically, these areas are located along Lake Miona, Black Lake, between Black Lake and Cherry Lake, and at some locations south of Black Lake. Under the District’s rules, compensation must be provided for any loss of flood zone in filled areas by the excavation of other areas. The District has determined, based upon the documentation provided with the Villages Inc.’s application, work on the site will encroach on 871.37 acre feet of the FEMA 100-year flood zone. However, 1,051.70 acre feet of compensating flood zone is being created. The Villages Inc. proposes to mitigate for the loss of flood zone primarily in the areas of Dry Prairie and Cherry Lake. At present, Cherry Lake is the location of a peat mining operation authorized by DEP permit. Mining has occurred at that site since the early 1980s. The flood zone mitigation proposed by the Villages Inc. provides reasonable assurance that it will sufficiently compensate for any loss of flood basin storage. The Villages Inc.'s project provides reasonable assurance that it will neither adversely affect surface water storage or conveyance capabilities, surface or groundwater levels or surface water flows nor cause adverse flooding. Each of the 45 retention ponds to be constructed on-site will include sufficient capacity, above the top of the pond liner, to hold a 100-year/24-hour storm event. This includes stormwater drainage from off-site. In addition, these ponds are designed to have an extra one foot of freeboard above that needed for the 100-year/24-hour storm, thus providing approximately an additional 100 acres of flood storage beyond that which will be lost through construction on-site. Furthermore, the Villages Inc. has proposed an emergency flood plan. In the event of a severe flood event, excess water will be pumped from Dry Prairie, Cherry Lake, and Lake Miona and delivered to the retention ponds and to certain golf course fairways located such that habitable living spaces would not be endangered. Environmental Impacts and Mitigation There are 601 acres of wetlands and surface waters of various kinds in the Villages Inc.’s project area. Forty-one acres of wetlands will be impacted by the work that is authorized under the ERP. Each of these impacted wetlands, along with the extent of the impact, is listed in the ERP. The impacts include both fill and excavation and all will be permanent. When assessing wetland impacts and proposed mitigation for those impacts, the District seeks to ensure that the activities proposed will not result in a net loss of wetland functionality. The object is to ensure that the end result will function at least as well as did the wetlands in their pre-impact condition. Functional value is judged, at least in part, by the long term viability of the wetland. While small, isolated wetlands are not completely without value, large wetland ecosystems – which are less susceptible to surrounding development – generally have greater long-term habitat value. The District’s policy is that an applicant need not provide any mitigation for the loss of habitat in wetlands of less than 0.5 acre, except under certain limited circumstances, including where the wetland is utilized by threatened or endangered species. Some wetlands that will be impacted by the Villages Inc.’s project are of high functional value and some are not as good. The Villages Inc. proposes a variety of types of mitigation for the wetlands impacts that will result from its project, all of which are summarized in the ERP. In all, 331.55 acres of mitigation are proposed by the Villages Inc. First, the District proposes to create new wetlands. Approximately 11 acres of this new wetland will consist of a marsh, which is to be created east of Cherry Lake. Second, it proposes to undertake substantial enhancement of Dry Prairie, a 126-acre wetland. Currently – and since at least the early nineties – Dry Prairie received discharge water from the peat mining operation at Cherry Lake. Without intervention, when the mining operations stop, Dry Prairie would naturally become drier than it has been for several years and would lose some of the habitat function that it has been providing. The Villages Inc.’s proposed enhancement is designed to match the current hydroperiods of Dry Prairie, thus ensuring its continued habitat value. Third, the Villages Inc. has proposed to enhance upland buffers around wetlands and surface waters by planting natural vegetation, thus providing a natural barrier. Placement of these buffers in conservation easements does not provide the Villages Inc. with mitigation credit, since a 25-foot buffer is required anyway. However, the District determined that the enhancement of these areas provided functional value to the wetlands and surface waters that would not be served by the easements alone. Fourth, the Villages Inc. will place a conservation easement over certain areas, including a 1500-foot radius preserve required by the Fish and Wildlife Conservation Commission (FWCC) around an identified eagles’ nest. These areas will also be used for the relocation of gopher tortoises and, if any are subsequently located, of gopher frogs. While the Villages Inc. is also performing some enhancement of this area, it will receive no mitigation credit for such enhancement – which was required to meet FWCC requirements. However, since the conservation easement will remain in effect in perpetuity, regardless of whether the eagles continue to use the nest, the easement ensures the continued, viability of the area’s wetlands and provides threatened and endangered species habitat. In order to provide additional assurances that these mitigation efforts will be successful, the District has included a condition in the proposed permit establishing wetland mitigation success criteria for the various types of proposed mitigation. If these success criteria are not achieved, additional mitigation must be provided. With the above described mitigation, the activities authorized under the ERP will not adversely impact the functional value of wetlands and other surface waters to fish or wildlife. The Villages Inc. has met its burden of providing reasonable assurances relating to this permit criterion. Capability of Performing Effectively The Villages Inc. has also provided reasonable assurances that the stormwater management system proposed is capable of functioning as designed. The retention ponds proposed are generally of a standard-type design and will not require complicated maintenance procedures. In its assessment of the functional capability of the system, the District did not concern itself with the amount of stormwater that the system might contribute for irrigation purposes. Rather, it focused its consideration on the stormwater management functions of the system. The question of the effectiveness of the system for irrigation purposes is not relevant to the determination of whether the Villages Inc. has met the criteria for permit issuance. Consequently, the record establishes that the documentation provided by the Villages Inc. contains reasonable assurances that the stormwater system will function effectively and as proposed. Operation Entity The Villages Inc. has created Community Development District No. 5 (CDD No. 5), which will serve as the entity responsible for the construction and maintenance of the stormwater system. CDD No. 5 will finance the construction through special revenue assessment bonds and will finance maintenance through the annual assessments. Similar community development districts were established to be responsible for earlier phases of the Villages Inc. The ERP includes a specific condition that, prior to any wetlands impacts, the Villages Inc. will either have to provide the District with documentation of the creation of a community development district or present the District with a performance bond in the amount of $1,698,696.00. Since the undisputed testimony at hearing was that CDD No. 5 has, in fact, now been created, there are reasonable assurances of financial responsibility. Secondary and Cumulative Impacts The Villages Inc.’s application also provides accurate and reliable information sufficient to establish that there are reasonable assurances that the proposed stormwater system will not cause unacceptable cumulative impacts upon wetlands or other surface waters or adverse secondary impacts to water resources. The system is designed in a manner that will meet water treatment criteria and there will be no secondary water quality impacts. Further, the use of buffers will prevent secondary impacts to wetlands and wetland habitats and there will be no secondary impacts to archeological or historical resources. In this instance, the stormwater system proposed by the Villages Inc. will function in a manner that replaces any water quantity or water quality functions lost by construction of the system. In its assessment of the possible cumulative impacts of the system, the District considered areas beyond the bounds of the current project, including the area to the south that is currently being reviewed under the DRI process as a substantial deviation. The District’s environmental scientist, Leonard Bartos, also reviewed that portion of the substantial deviation north of County Road 466A, in order to determine the types of wetlands present there. Furthermore, the District is one of the review agencies that comments on DRI and substantial deviation applications. When such an application is received by the District’s planning division, it is routed to the regulatory division for review. The District includes its knowledge of the DRIs in its determination that there are no cumulative impacts. Reasonable assurances have been provided as to these permitting criteria. Public Interest Balancing Test Because the proposed stormwater system will be located in, on, and over certain wetlands, the Villages Inc. must provide reasonable assurances that the system will not be contrary to the public interest. This assessment of this permitting criteria requires that the District balance seven factors. While the effects of the proposed activity will be permanent, the Villages Inc. has provided reasonable assurances that it will not have an adverse impact on the public health, safety, or welfare; on fishing or recreational values; on the flow of water; on environmental resources, including fish and wildlife and surface water resources; or on off-site properties. Furthermore, the District has carefully assessed the current functions being provided by the affected wetland areas. With respect to historical or archeological resources, the Villages Inc. has received letters from the Florida Department of State, Division of Historical Resources, stating that there are no significant historical or archeological resources on the project site that is the subject of this permit proceeding. Thus, the evidence establishes reasonable assurances that the Villages Inc.'s stormwater system will not be contrary to the public interest. Additionally, the District and Applicant presented uncontroverted evidence that the proposed project will not adversely impact a work of the District, and that there are no applicable special basin or geographic area criteria.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is: RECOMMENDED that a final order be entered issuing Water Use Permit Nos. 20012236.000 and 20012239.000 and Environmental Resource Permit No. 43020198.001, in accordance with the District’s proposed agency action. DONE AND ENTERED this 24th day of June, 2002, in Tallahassee, Leon County, Florida. DON W. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of June, 2002.

Florida Laws (5) 120.569120.57373.203380.06403.412
# 2
SUMTER CITIZENS AGAINST IRRESPONSIBLE DEVELOPMENT, INC.; KENNETH ROOP; AND AUBREY VARNUM vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND NORTH SUMTER UTILITY COMPANY, 02-001122 (2002)
Division of Administrative Hearings, Florida Filed:Bushnell, Florida Mar. 20, 2002 Number: 02-001122 Latest Update: Aug. 12, 2002

The Issue Whether proposed Water Use Permits Nos. 20012236.000 (the Potable Water Permit) and 20012239.000 (the Irrigation Permit) and proposed Environmental Resource Permit No. 43020198.001 (the ERP) should be issued by the Respondent, Southwest Florida Water Management District (the District).

Findings Of Fact The Parties The individual Petitioners, Farnsworth, Roop, and Varnum are all Florida citizens and residents of Sumter County. None of the individual Petitioners offered any evidence relating to direct impacts that the ERP would have on their property. With respect to the Potable Water and Irrigation Permits, anecdotal testimony was presented by Petitioners and Wing and Weir relating to well failures and sinkholes in the area. Two Petitioners, Roop and Varnum, live in close proximity to the property encompassed by the three permits. Petitioner Farnsworth’s property is approximately three and a half miles from the project boundary. Wing and Weir live approximately four and a half to five and 18 miles from the project site, respectively. SCAID is a Florida not-for-profit corporation that has approximately 130 members. Farnsworth, the president of SCAID, identified only Roop and Varnum as members who will be directly affected by the activities to be authorized by the permits. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries. The Utility and the Authority are limited liability companies, of which the Villages Inc. is the managing partner. The Villages Inc. is a Florida corporation. The Utility, which will serve as a provider of potable water, is regulated by the Public Service Commission, while the Authority which will provide irrigation water, is not. The Villages Inc., Development The Villages Inc. is a phased, mixed use, retirement community, which is located at the intersecting borders of Lake, Marion, and Sumter Counties. Development has been on going since at least 1983, with a current planning horizon of the year 2019. Currently, there are 15,362 constructed dwelling units in the built-out portion of the Villages Inc. that are located in Lake County and the extreme northeast corner of Sumter County. The portion located in Marion County is 60 percent complete, with 750 homes completed and another 600 under construction. Approximately another 22,000 residences are planned for development in Sumter County by the year 2012, with an additional 10,200 by the year 2019. However, the Potable Water and Irrigation Permits are only for a six-year duration, and the ERP has a duration of only six years. None of the permits authorize development activities beyond that time frame. Generally speaking, the three permits at issue include an area owned by the Villages Inc. that lies in northeast Sumter County South of County Road 466 and North of County Road 466A. However, it is not projected that this entire area will be built-out during the terms of three proposed permits. Area Hydrology and Topography In the area of the Villages Inc., there is a layer of approximately five to ten feet of sand at the land surface, which is underlain by ten to 70 feet of a clayey sand. Both of these constitute the surficial aquifer and are extremely leaky, allowing water to percolate easily through to a lower layer. Except in the vicinity of Lake Miona, there is no water in the surficial aquifer except after rainfall events. The clayey sand layer is underlain by the Upper Floridan, a limestone unit. The top of this limestone layer ("the top of the rock") occurs at fluctuating depths of between 30 and 70 feet. At approximately 350 to 400 feet below the land surface, there begins a transition to a denser unit that serves as a confining layer between the Upper Floridan production zone and the Lower Floridan production zone. This confining layer, which was confirmed by drilling at three locations in the Villages Inc. is approximately 150 feet thick in the area of the Villages Inc. Another transition, this time to a less dense formation, begins at approximately 550 to 600 feet, which is considered the top of the Lower Floridan production zone. While testing conducted on the project site indicated almost no leakage between the Upper and Lower Floridan production zones, it is generally known by experts that there is some exchange of water between the two layers. Both the Upper and the Lower Floridan contain water that meets potable water standards and both are considered water production zones. The water quality of the two zones is not significantly different. The project area is prone to karst activity, that is, the formation of sinkholes. Sinkholes are formed as a result of the collapse of the overburden above subsurface cavities which have been formed through a very gradual dissolution of limestone, thus resulting in a "sink" at the land surface. Surface water bodies in the area include Lake Miona, Black Lake, Cherry Lake, and Dry Prairie, as well as several other small wetlands. The Potable Water and Irrigation Permits The potable water permit is for the withdrawal from the Upper Floridan Aquifer of 1.164 million gallons of water per day (MGD), on an annual average, for potable use in residences and both commercial and recreational establishments. It also limits the maximum withdrawal during peak months to 2.909 MGD. The Irrigation Permit is for the withdrawal from the Lower Floridan Aquifer of 2.850 MGD, on an annual average, for use in irrigation. The peak month usage rate permissible under the proposed permit would be 9.090 MGD. Water withdrawal under the Irrigation Permit will be used for the irrigation of residential lawns, common areas, commercial landscaping, and golf courses. Modeling of Drawdowns In assessing the impacts of proposed water withdrawals from an aquifer, District personnel considered effects on the aquifers and on-surface water features in the area. Computer- generated models of the predicted effects of the Potable Water and Irrigation Permits withdrawals provided one of the principal bases for this assessment. The primary geologist assigned to review the permit applications reviewed two of the models submitted by the Utility and the Authority (jointly the WUP Applicants) and ran one personal model of her own in order to predict the effects of the proposed withdrawals on the aquifers, as well as on any wetlands and other surface water bodies. In particular, the models predict both the vertical and horizontal extent to which the withdrawals may lower the level of water within the aquifers and in-surface waters under various conditions. One of the models submitted by the WUP Applicants predicted drawdowns during a 90-day period of no rainfall while the other predicted the impacts of the withdrawals over the life of the permits, considered cumulatively with the effects of withdrawals from the already-existing Villages' development in Sumter, Marion, and Lake Counties. The District’s geologist modeled the impacts of the withdrawals over the life of the permits and included the cumulative effects of all of the current Villages' withdrawals in Sumter County. All of these models included the combined effects of both the proposed Potable Water and the Irrigation Permits. Based upon these models, it is concluded that there will be no significant drawdowns as a result of the withdrawals authorized by the proposed water use permits. Specifically, the only predicted drawdown in the surficial aquifer (0.25 feet of drawdown) is in an area where there are no natural surface water features. Drawdown in the Upper Floridan is predicted at between 0.1 and 0.2 feet, while the drawdown in the Lower Floridan is predicted at a maximum of 1.5 feet. These minor drawdowns are not expected to cause any adverse impacts. Transmissivity is the rate at which water moves horizontally through the aquifer. In areas with high transmissivity, the results of water withdrawals from an aquifer will generally be low in magnitude, but broad in lateral extent. Water withdrawals from areas of low transmissivity will result in cones of depression that are more limited in lateral extent, but steeper vertically. The use of too high a transmissivity rate in a model, would overpredict the horizontal distance of the drawdowns caused by withdrawals, but would underpredict the vertical drawdown in the immediate vicinity of the withdrawal. Conversely, use of too low a transmissivity would over-predict the effects in the immediate vicinity of the withdrawal but underpredict the lateral extent of the drawdown. The WUP Applicants’ models used a transmissivity value for the Lower Floridan Aquifer of 100,000 feet squared per day ("ft.2/d'). The WUP Applicants’ consultant derived the transmissivity values from a regional model prepared by the University of Florida. The regional model uses a transmissivity value for the entire region of 200,000 ft.2/d for the Lower Floridan. While that transmissivity is appropriate for assessing large-scale impacts, on a more localized level, the transmissivity of the aquifer may be lower. Therefore, the WUP Applicants’ consultant met with District representatives and agreed to use a value half that used in the University of Florida model. A similar approach was used for the transmissivity value used in modeling effects in the Upper Floridan. Notably, specific transmissivity values recorded in four wells in the Villages Inc. area were not used because two of these wells were only cased to a depth of just over 250 feet, with an open hole below that to a depth of 590 feet. Thus, the transmissivity measured in these wells reflect conditions in the confining layer at the immediate location of the wells - not the transmissivity of the Lower Floridan production zone. Further, site-specific information on transmissivity, measured during pump tests at individual wells, does not correlate well to the transmissivity of the aquifer, even at short distances from the well. Transmissivities measured at individual wells are used to determine the depth at which the pump should be set in the well, not to determine the transmissivity of the aquifer. Thus, the use of transmissivities derived from the regional model, but adjusted to be conservative, is entirely appropriate. Moreover, using a transmissivity in her modeling of the project impacts of 27,000 ft.2/d for the Lower Floridan Aquifer, the district geologist’s model predicted no adverse impacts. Leakance is the measure of the resistance of movement vertically through confining units of the aquifer. The leakance value used by the District for the confining layer between the Upper and Lower Floridan was taken from the University of Florida model. Tests conducted on the site actually measured even lower leakance values. Thus, the evidence establishes that the leakance value used in the WUP Applicants’ and the District’s modeling for the Floridan confining layer was reasonable and appropriate. Competent, substantial evidence also establishes that the leakance value used for Lake Miona was reasonable. The WUP Applicants submitted to the District substantial data, gathered over several years, reflecting the balance of water flowing into Lake Miona and the lake’s levels in relation to the potentiometric surface. This documentation verified the leakance value used for Lake Miona in the modeling. Finally, the District modeling used appropriate boundary condition parameters. The District modeling used what is known as the "constant head" boundary and assumes the existence of water generated off-site at the boundaries. Such a boundary simulates the discharge of the aquifer at a certain level. The use of constant head boundaries is an accepted practice. The modeling conducted on behalf of the District and the Applicants provides a reasonable assurances that the Potable Water and Irrigation Permits will not cause adverse water quality or quantity changes to surface or groundwater resources, will not cause adverse environmental impacts to natural resources, and will not cause pollution of the aquifer. Furthermore, because the predicted drawdowns are so insignificant, reasonable assurances have been provided that the withdrawals will not adversely impact existing off-site land uses or existing legal withdrawals. The modeling also provides reasonable assurances that the withdrawals will not be harmful to the water resources of the District. Moreover, monitoring requirements included in the proposed Potable Water and Irrigation Permits provide additional reasonable assurance that – should the withdrawal effects exceed those predicted by the modeling – such effects are identified and necessary steps are taken to mitigate for any potential impacts. The District has reserved the right to modify or revoke all or portions of the water use permits under certain circumstances. Specifically, the proposed Potable Water Permit requires a monitoring plan that includes the following pertinent provisions: There shall be no less than three control wetland and ten onsite wetland monitoring sites; A baseline monitoring report, outlining the current wetland conditions; * * * A statement indicating that an analysis of the water level records for area lakes, including Miona Lake, Black Lake, Cherry Lake, Lake Deaton and Lake Griffin, will be included in the annual report; A statement indicating that an analysis of the spring flow records for Gum Spring, Silver Spring, and Fenney Spring, will be included in the annual report; * * * Wildlife analyses for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods to determine success of the mitigation; A mitigation plan for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods and thresholds to determine success of the mitigation; An annual report of an analysis of the monitoring data . . . . Similar provisions are included in the proposed irrigation permit. The WUP Applicants, in conjunction with the District, have developed sites and methodologies for this monitoring. Reasonable Demand The water to be withdrawn under the proposed Potable Water Permit will serve 10,783 people. This total results from the simple multiplication of the number of residences to be built during the next six years (5,675) by the average number of residents per household (1.9). Those numbers are based upon historical absorption rates within the Villages Inc. development since 1983, an absorption rate that doubles approximately every five years. The Utility proposed a per capita use rate of 108 gallons per day for potable use only. District personnel independently verified that per capita rate, based upon current usage in the existing portions of the Villages Inc. and determined that the rate was reasonable. Based upon the population projections and the per capita rate, the District determined that there is a reasonable demand for the withdrawal of the amount of water, for potable purposes, that is reflected in the Potable Water Permit. The Utility has provided reasonable assurance regarding the Utility’s satisfaction of this permitting criterion. As to the irrigation permit, the Villages Inc. plans, within the next six years, to complete the construction of 1,911 acres of property that will require irrigation. The amount of water originally requested by the Authority for irrigation withdrawals was reduced during the course of the application process at the request of the District. The District determined the reasonable amount of irrigation water needed through the application of AGMOD, a computer model that predicts the irrigation needs of various vegetative covers. Since the Authority intends to utilize treated wastewater effluent as another source of irrigation water, the District reduced the amount of water that it would permit to be withdrawn from the Lower Floridan for irrigation. The District, thus, determined that the Authority would need 1.59 MGD annual average for recreational and aesthetic area irrigation and 1.26 MGD annual average for residential lawn irrigation, for a total of 2.85 MGD. The Villages Inc. also plans to accumulate stormwater in lined ponds for irrigation use. However, unlike its treatment of wastewater effluent, the District did not deduct accumulated stormwater from the amount of water deemed necessary for irrigation. This approach was adopted due to the inability to predict short-term rainfall amounts. The uncontroverted evidence of record establishes reasonable assurances that there is a reasonable demand for the amount of water to be withdrawn under the proposed irrigation permit. Conservation and Reuse Measures Both the Utility and the Authority applications included proposed measures for the conservation and reuse of water. The conservation plan submitted in conjunction with the irrigation permit application provides for control valves to regulate both the pressure and timing of irrigation by residential users; contractual restrictions on water use by commercial users; xeriscaping; and an irrigation control system for golf course irrigation that is designed to maximize the efficient use of water. In addition, in the proposed permits, the District requires the Utility and the Authority to expand upon these conservation measures through such measures as educational efforts, inclined block rate structures, and annual reporting to assess the success of conservation measures. The Authority also committed to reduce its dependence on groundwater withdrawals through the reuse of wastewater effluent, both from the on-site wastewater treatment facility and through contract with the City of Wildwood. Reasonable assurances have been provided that conservation measures have been incorporated and that, to the maximum extent practicable, reuse measures have been incorporated. Use of Lowest Available Quality of Water In addition to the reuse of treated wastewater effluent, the Authority intends to minimize its dependence on groundwater withdrawals for irrigation use through the reuse of stormwater accumulated in lined ponds. Thirty-one of the lined stormwater retention ponds to be constructed by the Villages Inc. are designed as a component of the irrigation system on-site. Ponds will be grouped with the individual ponds within each group linked through underground piping. There will be an electronically controlled valve in the stormwater pond at the end of the pipe that will be used to draw out water for irrigation purposes. These lined stormwater ponds serve several purposes. However, the design feature that is pertinent to the reuse of stormwater for irrigation is the inclusion of additional storage capacity below the top of the pond liner. No groundwater will be withdrawn for irrigation purposes unless the level of stormwater in these lined ponds drops below a designed minimum irrigation level. Groundwater pumped into these ponds will then be pumped out for irrigation. Thus, the use of groundwater for irrigation is minimized. The Authority has met its burden of proving that it will use the lowest quality of water available. With respect to the potable permit, the evidence establishes that there are only minor differences between the water quality in the Upper Floridan and Lower Floridan in this area. The Upper Floridan is a reasonable source for potable supply in this area. Thus, reasonable assurances have been provided by the Utility that it will utilize the lowest water quality that it has the ability to use for potable purposes. Waste of Water In regard to concerns that the design of the Villages Inc.'s stormwater/irrigation system will result in wasteful losses of water due to evaporation from the surface of the lined ponds, it must be noted that there are no artesian wells relating to this project and nothing in the record to suggest that the groundwater withdrawals by either the Utility or the Authority will cause excess water to run into the surface water system. Additionally, the evidence establishes that, to the extent groundwater will be withdrawn from the Lower Floridan and pumped into lined stormwater ponds, such augmentation is not for an aesthetic purpose. Instead, the groundwater added to those ponds will be utilized as an integral part of the irrigation system and will be limited in quantity to the amount necessary for immediate irrigation needs. Finally, the water to be withdrawn will be put to beneficial potable and irrigation uses, rather than wasteful purposes. Under current regulation, water lost from lined stormwater ponds through evaporation is not considered as waste. Thus, the Authority and the Utility have provided reasonable assurances that their withdrawals of groundwater will not result in waste. The ERP The stormwater management system proposed by the Villages Inc. will eventually serve 5,016 acres on which residential, commercial, golf course, and other recreational development will ultimately be constructed. However, the proposed permit currently at issue is preliminary in nature and will only authorize the construction of stormwater ponds, earthworks relating to the construction of compensating flood storage, and wetland mitigation. Water Quality Impacts The stormwater management system will include eight shallow treatment ponds that will be adjacent to Lake Miona and Black Lake and 45 lined retention ponds. Thirty-one of these lined ponds will serve as part of the irrigation system for a portion of the Villages Inc.'s development. All of these ponds provide water quality treatment. The unlined ponds will retain the first one inch of stormwater and then overflow into the lakes. The ponds provide water quality treatment of such water before it is discharged into the lakes. The water quality treatment provided by these ponds provides reasonable assurances that the project will not adversely impact the water quality of receiving waters. While they do not discharge directly to surface receiving waters, the lined retention ponds do provide protection against adverse water quality impacts on groundwater. There will be some percolation from these ponds, from the sides at heights above the top of the liner. However, the liners will prevent the discharge of pollutants through the highly permeable surface strata into the groundwater. The Villages Inc. designed the system in this manner in response to concerns voiced by the Department of Environmental Protection during the DRI process regarding potential pollutant loading of the aquifer at the retention pond sites. Furthermore, by distributing the accumulated stormwater - through the irrigation system - over a wider expanse of vegetated land surface, a greater degree of water quality treatment will be achieved than if the stormwater were simply permitted to percolate directly through the pond bottom. There is no reasonable expectation that pollutants will be discharged into the aquifer from the lined ponds. If dry ponds were used, there would be an accumulation of pollutants in the pond bottom. These measures provide reasonable assurances that there will be no adverse impact on the quality of receiving waters. Water Quantity Impacts With regard to the use of lined retention ponds, as part of the Villages Inc.’s stormwater system and the impact of such ponds on water quantity, the evaporative losses from lined ponds as opposed to unlined ponds is a differential of approximately one (1) inch of net recharge. The acreage of the lined ponds - even measured at the very top of the pond banks - is only 445 acres. That differential, in terms of a gross water balance, is not significant, in view of the other benefits provided by the lined ponds. As part of the project, wetlands will be created and expanded and other water bodies will be created. After rainfalls, these unlined ponds will be filled with water and will lose as much water through evaporation as would any other water body. The design proposed by the Villages Inc., however, will distribute the accumulated stormwater across the project site through the irrigation of vegetated areas. The documentation submitted by the Villages Inc. establishes that the ERP will not cause adverse water quantity impacts. The Villages Inc. has carried its burden as to this permitting criterion. Flooding, Surface Water Conveyance, and Storage Impacts Parts of the project are located in areas designated by the Federal Emergency Management Administration (FEMA) as 100-year flood zones. Specifically, these areas are located along Lake Miona, Black Lake, between Black Lake and Cherry Lake, and at some locations south of Black Lake. Under the District’s rules, compensation must be provided for any loss of flood zone in filled areas by the excavation of other areas. The District has determined, based upon the documentation provided with the Villages Inc.’s application, work on the site will encroach on 871.37 acre feet of the FEMA 100-year flood zone. However, 1,051.70 acre feet of compensating flood zone is being created. The Villages Inc. proposes to mitigate for the loss of flood zone primarily in the areas of Dry Prairie and Cherry Lake. At present, Cherry Lake is the location of a peat mining operation authorized by DEP permit. Mining has occurred at that site since the early 1980s. The flood zone mitigation proposed by the Villages Inc. provides reasonable assurance that it will sufficiently compensate for any loss of flood basin storage. The Villages Inc.'s project provides reasonable assurance that it will neither adversely affect surface water storage or conveyance capabilities, surface or groundwater levels or surface water flows nor cause adverse flooding. Each of the 45 retention ponds to be constructed on-site will include sufficient capacity, above the top of the pond liner, to hold a 100-year/24-hour storm event. This includes stormwater drainage from off-site. In addition, these ponds are designed to have an extra one foot of freeboard above that needed for the 100-year/24-hour storm, thus providing approximately an additional 100 acres of flood storage beyond that which will be lost through construction on-site. Furthermore, the Villages Inc. has proposed an emergency flood plan. In the event of a severe flood event, excess water will be pumped from Dry Prairie, Cherry Lake, and Lake Miona and delivered to the retention ponds and to certain golf course fairways located such that habitable living spaces would not be endangered. Environmental Impacts and Mitigation There are 601 acres of wetlands and surface waters of various kinds in the Villages Inc.’s project area. Forty-one acres of wetlands will be impacted by the work that is authorized under the ERP. Each of these impacted wetlands, along with the extent of the impact, is listed in the ERP. The impacts include both fill and excavation and all will be permanent. When assessing wetland impacts and proposed mitigation for those impacts, the District seeks to ensure that the activities proposed will not result in a net loss of wetland functionality. The object is to ensure that the end result will function at least as well as did the wetlands in their pre-impact condition. Functional value is judged, at least in part, by the long term viability of the wetland. While small, isolated wetlands are not completely without value, large wetland ecosystems – which are less susceptible to surrounding development – generally have greater long-term habitat value. The District’s policy is that an applicant need not provide any mitigation for the loss of habitat in wetlands of less than 0.5 acre, except under certain limited circumstances, including where the wetland is utilized by threatened or endangered species. Some wetlands that will be impacted by the Villages Inc.’s project are of high functional value and some are not as good. The Villages Inc. proposes a variety of types of mitigation for the wetlands impacts that will result from its project, all of which are summarized in the ERP. In all, 331.55 acres of mitigation are proposed by the Villages Inc. First, the District proposes to create new wetlands. Approximately 11 acres of this new wetland will consist of a marsh, which is to be created east of Cherry Lake. Second, it proposes to undertake substantial enhancement of Dry Prairie, a 126-acre wetland. Currently – and since at least the early nineties – Dry Prairie received discharge water from the peat mining operation at Cherry Lake. Without intervention, when the mining operations stop, Dry Prairie would naturally become drier than it has been for several years and would lose some of the habitat function that it has been providing. The Villages Inc.’s proposed enhancement is designed to match the current hydroperiods of Dry Prairie, thus ensuring its continued habitat value. Third, the Villages Inc. has proposed to enhance upland buffers around wetlands and surface waters by planting natural vegetation, thus providing a natural barrier. Placement of these buffers in conservation easements does not provide the Villages Inc. with mitigation credit, since a 25-foot buffer is required anyway. However, the District determined that the enhancement of these areas provided functional value to the wetlands and surface waters that would not be served by the easements alone. Fourth, the Villages Inc. will place a conservation easement over certain areas, including a 1500-foot radius preserve required by the Fish and Wildlife Conservation Commission (FWCC) around an identified eagles’ nest. These areas will also be used for the relocation of gopher tortoises and, if any are subsequently located, of gopher frogs. While the Villages Inc. is also performing some enhancement of this area, it will receive no mitigation credit for such enhancement – which was required to meet FWCC requirements. However, since the conservation easement will remain in effect in perpetuity, regardless of whether the eagles continue to use the nest, the easement ensures the continued, viability of the area’s wetlands and provides threatened and endangered species habitat. In order to provide additional assurances that these mitigation efforts will be successful, the District has included a condition in the proposed permit establishing wetland mitigation success criteria for the various types of proposed mitigation. If these success criteria are not achieved, additional mitigation must be provided. With the above described mitigation, the activities authorized under the ERP will not adversely impact the functional value of wetlands and other surface waters to fish or wildlife. The Villages Inc. has met its burden of providing reasonable assurances relating to this permit criterion. Capability of Performing Effectively The Villages Inc. has also provided reasonable assurances that the stormwater management system proposed is capable of functioning as designed. The retention ponds proposed are generally of a standard-type design and will not require complicated maintenance procedures. In its assessment of the functional capability of the system, the District did not concern itself with the amount of stormwater that the system might contribute for irrigation purposes. Rather, it focused its consideration on the stormwater management functions of the system. The question of the effectiveness of the system for irrigation purposes is not relevant to the determination of whether the Villages Inc. has met the criteria for permit issuance. Consequently, the record establishes that the documentation provided by the Villages Inc. contains reasonable assurances that the stormwater system will function effectively and as proposed. Operation Entity The Villages Inc. has created Community Development District No. 5 (CDD No. 5), which will serve as the entity responsible for the construction and maintenance of the stormwater system. CDD No. 5 will finance the construction through special revenue assessment bonds and will finance maintenance through the annual assessments. Similar community development districts were established to be responsible for earlier phases of the Villages Inc. The ERP includes a specific condition that, prior to any wetlands impacts, the Villages Inc. will either have to provide the District with documentation of the creation of a community development district or present the District with a performance bond in the amount of $1,698,696.00. Since the undisputed testimony at hearing was that CDD No. 5 has, in fact, now been created, there are reasonable assurances of financial responsibility. Secondary and Cumulative Impacts The Villages Inc.’s application also provides accurate and reliable information sufficient to establish that there are reasonable assurances that the proposed stormwater system will not cause unacceptable cumulative impacts upon wetlands or other surface waters or adverse secondary impacts to water resources. The system is designed in a manner that will meet water treatment criteria and there will be no secondary water quality impacts. Further, the use of buffers will prevent secondary impacts to wetlands and wetland habitats and there will be no secondary impacts to archeological or historical resources. In this instance, the stormwater system proposed by the Villages Inc. will function in a manner that replaces any water quantity or water quality functions lost by construction of the system. In its assessment of the possible cumulative impacts of the system, the District considered areas beyond the bounds of the current project, including the area to the south that is currently being reviewed under the DRI process as a substantial deviation. The District’s environmental scientist, Leonard Bartos, also reviewed that portion of the substantial deviation north of County Road 466A, in order to determine the types of wetlands present there. Furthermore, the District is one of the review agencies that comments on DRI and substantial deviation applications. When such an application is received by the District’s planning division, it is routed to the regulatory division for review. The District includes its knowledge of the DRIs in its determination that there are no cumulative impacts. Reasonable assurances have been provided as to these permitting criteria. Public Interest Balancing Test Because the proposed stormwater system will be located in, on, and over certain wetlands, the Villages Inc. must provide reasonable assurances that the system will not be contrary to the public interest. This assessment of this permitting criteria requires that the District balance seven factors. While the effects of the proposed activity will be permanent, the Villages Inc. has provided reasonable assurances that it will not have an adverse impact on the public health, safety, or welfare; on fishing or recreational values; on the flow of water; on environmental resources, including fish and wildlife and surface water resources; or on off-site properties. Furthermore, the District has carefully assessed the current functions being provided by the affected wetland areas. With respect to historical or archeological resources, the Villages Inc. has received letters from the Florida Department of State, Division of Historical Resources, stating that there are no significant historical or archeological resources on the project site that is the subject of this permit proceeding. Thus, the evidence establishes reasonable assurances that the Villages Inc.'s stormwater system will not be contrary to the public interest. Additionally, the District and Applicant presented uncontroverted evidence that the proposed project will not adversely impact a work of the District, and that there are no applicable special basin or geographic area criteria.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is: RECOMMENDED that a final order be entered issuing Water Use Permit Nos. 20012236.000 and 20012239.000 and Environmental Resource Permit No. 43020198.001, in accordance with the District’s proposed agency action. DONE AND ENTERED this 24th day of June, 2002, in Tallahassee, Leon County, Florida. DON W. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of June, 2002.

Florida Laws (5) 120.569120.57373.203380.06403.412
# 3
BECKY AYECH vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 01-002294 (2001)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Jun. 07, 2001 Number: 01-002294 Latest Update: Dec. 24, 2001

The Issue The issue presented for decision in this case is whether Respondent, the Southwest Florida Water Management District (the "District"), should issue Water Use Permit ("WUP") No. 20005687.003 to Dr. Thomas E. Kelly, pursuant to the terms of the proposed permit issued on April 11, 2001.

Findings Of Fact Based on the oral and documentary evidence adduced at the final hearing and the entire record in this proceeding, the following findings of fact are made: PARTIES Petitioner Becky Ayech is a resident of Sarasota County and a citizen of the State of Florida. The District is a water management district in the State of Florida created pursuant to Section 373.069(1)(d) and (2)(d), Florida Statutes. The District is the governmental agency charged with the responsibility and authority to review and act upon water use permit applications, pursuant to Chapter 373, Part II, Florida Statutes, and Chapters 40D-1 and 40D-2, Florida Administrative Code. Dr. Thomas E. Kelly is the owner of the real property in Sarasota County on which Pop's Golf and Batting Center is located, and as such is recognized as the applicant for and holder of any WUP issued for the property. Pursuant to a 50- year lease with Dr. Kelly, Ralph Perna owns and operates Pop's Golf and Batting Center and is the person who would be responsible for day-to-day compliance with the terms of the WUP at issue. Neither Dr. Kelly nor Mr. Perna formally intervened in this proceeding. THE PROPOSED PERMIT The proposed permit is for irrigation and sanitary uses at a golf driving range and batting cage facility called Pop's Golf and Batting Center, on Fruitville Road in Sarasota County. The site leased by Mr. Perna comprises approximately 30 acres, of which the westward 15 acres is taken up by the Pop's facility. The eastern 15 acres is heavily wooded, overgrown with brush, and contains a five-acre lake. The majority of the 15 acres used by Pop's is taken up by the landing area for the driving range. Near the front of the facility are a tee box and putting green sown with Bermuda grass. This grassy area, about six-tenths of an acre, is the only part of the 30-acre property requiring irrigation, aside from some landscape plants in front of the business office. The landing area is not watered and is not even set up for irrigation. The Pop's facility is in a low-lying area historically prone to flooding. For this reason, the tee box, putting green, and business office are elevated about two and one-half feet higher than the landing area. This elevation also serves the esthetic purpose of allowing golfers to follow the flight of their drives and watch the balls land. The proposed WUP is a renewal of an existing permit. The existing permit is premised on the property's prior use for agriculture, and permits withdrawals of 34,000 gpd on an average annual basis and 99,000 gpd on a peak monthly basis. The renewal would authorize withdrawals of 1,700 gpd on an average annual basis and 4,400 gpd on a peak monthly basis, reductions of 95 percent and 96 percent, respectively. "Average annual" quantity is the total amount of water withdrawn over the course of one year. This quantity is divided by 365 to arrive at the allowable gallons per day. "Peak monthly" quantity is the amount of water allowed to be withdrawn during the driest month of the year. This quantity is divided by 30 to arrive at the allowable gallons per day. Pop's draws water from two wells on the property. A six-inch diameter well, designated District Identification No. 1 ("DID 1"), is used for irrigation of the tee box and putting green. A four-inch diameter well, designated District Identification No. 3 ("DID 3"), is used to supply water to the two restrooms at the facility. THE PERMIT CONDITIONS The proposed WUP includes the following basic information: the permittee's name and address; the permit number; the date the permit application was filed; the date the permit was issued; the expiration date of the proposed permit; the property location; the quantity of water to be permitted; the withdrawal locations; and the water use classification proposed pursuant to the District's permit application. The District's permit application provides the applicant with the following five choices regarding proposed water use: Public Supply; Industrial or Commercial; Recreation or Aesthetic; Mining or Dewatering; and Agriculture. The proposed permit in this case has been classified as Recreation or Aesthetic. The proposed WUP would allow the permittee to withdraw from DID 1 an average of 1,600 gpd, with a peak monthly withdrawal of 4,200 gpd, and to withdraw from DID 3 an average of 100 gpd, with a peak monthly withdrawal of 200 gpd. The proposed WUP contains four Special Conditions. Relevant to the issues raised in this proceeding, Special Condition No. 3 requires the permittee to incorporate best water management practices, to limit daytime irrigation to the greatest extent practicable, to implement a leak detection and repair program, to conduct a system-wide inspection of the irrigation system at least once per year, and to evaluate the feasibility of improving the efficiency of the current irrigation system. Special Condition No. 4 requires the permittee to submit a conservation plan no later than April 30, 2006. The plan must address potential on-site reuse of water and external sources of reuse water. The proposed WUP also contains 16 Standard Conditions. Standard Condition No. 2 reserves the District's right to modify or revoke the WUP following notice and a hearing, should the District determine that the permittee's use of the water is no longer reasonable and beneficial, consistent with the public interest, or if the water use interferes with an existing legal use of water. Standard Condition No. 3 provides that the permittee may not deviate from the terms of the WUP without the District's written approval. Standard Condition No. 4 provides that, if the District declares a water shortage pursuant to Chapter 40D-21, Florida Administrative Code, the District may alter, modify, or declare inactive all or any part of the proposed WUP as necessary to address the water shortage. Standard Condition No. 5 provides that the District will collect water samples from DIDs 1 and 3, or require the permittee to submit water samples to the District, if the District determines there is a potential for adverse impacts to water quality. Standard Condition No. 9 provides that the District may require the permittee to cease or reduce its withdrawals if water levels in aquifers fall below minimum levels established by the District. Standard Condition No. 11 provides that the District may establish special regulations for Water Use Caution Areas ("WUCAs"), and that the permit will be subject to such regulations upon notice and a reasonable period to come into compliance. Standard Condition No. 12 requires the permittee to install flow metering or other measuring devices to record withdrawal quantities, when the District deems it necessary to analyze impacts to the water resource or existing users. CONDITIONS FOR ISSUANCE OF PERMIT Generally, the miniscule withdrawals proposed by Pop's would not fall within the District's permitting authority, which mostly confines itself to withdrawals of 100,000 gpd or more. However, Rule 40D-2.041(1)(c), Florida Administrative Code, requires a permit for any withdrawal from a well having an outside diameter of six inches or more at the surface. DID 1 has an outside diameter of six inches. An applicant for a WUP must demonstrate that the proposed use of water is reasonable and beneficial, is in the public interest, and will not interfere with any existing legal use of water, by providing reasonable assurances on both an individual and a cumulative basis that the proposed use of water satisfies the 14 specific conditions set forth in Rule 40D-2.301(1)(a)-(n), Florida Administrative Code, identified in the subheadings below. Necessary to Fulfill a Certain Reasonable Demand Pop's is open for business twelve hours per day. During the summer months, it averages 100 customers per day. The tee box and putting green at Pop's are heavily used. When golfers hit balls from the tee box, they make small gouges, or divots, in the Bermuda grass. These divots are later filled with sand, and the grass naturally grows over them. Irrigation is essential to the health of the Bermuda grass, allowing the application of fertilizer and chemicals to treat for pests and fungus. The tee box and putting green are watered as little as possible, because over-watering can itself lead to fungus problems with the Bermuda grass. The District uses an irrigation allocation computer program called AGMOD to determine reasonable average annual and peak monthly quantities for irrigation in an objective and consistent manner. Data on the pump capacity, soil type, the area to be irrigated, and its geographic location are input, and AGMOD allocates a quantity of water sufficient to irrigate for the driest 20 percent of the time, based on 75 years of historic rainfall data. The AGMOD program allows quantities for irrigation of the fairways of a typical golf course; however, Pop's does not have fairways and thus the proposed permit does not authorize any water for such irrigation. The District's expert, David Brown, credibly testified that the amounts allocated under this permit are conservative because the area to be irrigated is a high traffic area, because the irrigation methodology employed by Pop's ensures that 75 percent of the water withdrawn from DID 1 will get to the grass, because of the fertilizers and chemicals necessary to maintain and repair the grass, and because of the elevation of the area to be watered. Mr. Brown testified that the AGMOD model uses native soil types, not the fill used to elevate the tee box and putting green, and therefore the soil for the elevated areas will likely require more water and drain more quickly than AGMOD indicated. The quantities allocated for withdrawals from DID 3 on an average annual and peak monthly basis are necessary to fulfill the demand associated with the use of the two restrooms by Pop's employees and customers. In summary, the amounts of water authorized for withdrawal under the proposed permit are no more than necessary to fulfill a certain reasonable demand. Quantity/Quality Changes Adversely Impacting Resources The evidence at the hearing established that the operation of DIDs 1 and 3 pursuant to the terms of the proposed WUP will cause no quality or quantity changes adversely impacting the water resources. The proposed withdrawal amounts constitute a decrease of 95 percent on an average annual basis and of 96 percent on a peak monthly basis from the existing permit. The District reasonably presumes that decreases in permitted withdrawal amounts will not cause quantity or quality changes that will adversely impact the water resources. Nonetheless, Mr. Brown performed groundwater modeling to confirm that the District's presumption was correct in this case. The first step in model development is to study the geology at the site being studied. Mr. Brown looked at detailed information from surrounding WUPs and geographic logs to arrive at a "vertical" view of the stratigraphic column in place at Pop's, giving him an idea of which zones below Pop's produce water and which zones confine water and impede its movement between the producing units. Mr. Brown then looked to site-specific aquifer test information from other permits to give him an idea of the "horizontal" continuity of the system across the area under study. The hydrogeologic profile at Pop's contains five different aquifer production zones separated by confining units of clay or dense limestone. Moving downward from the surface, the production zones are the surficial aquifer, zones called Production Zone 2 ("PZ-2") and Production Zone 3 ("PZ- 3") within the intermediate aquifer, and the Suwannee limestone and Avon Park limestone layers within the Upper Floridan aquifer system. DID 3 has approximately 96 feet of casing and a total depth of approximately 195 feet. It draws water from PZ-2, the upper production zone of the intermediate aquifer. DID 1 was built before the District assumed regulation of well construction and consumptive water use; therefore, the District does not possess specific information as to its construction. Mr. Brown reviewed historical documents, including a 1930s report by the United States Geological Survey ("U.S.G.S.") about irrigation wells drilled in the location now occupied by Pop's. Mr. Brown's review led him to a reasonable conclusion that DID 1 has approximately 75 to 100 feet of casing and is drilled to a total depth of 600 to 700 feet below land surface. The District's water level measurements confirmed Mr. Brown's judgment, indicating that the well penetrates only through the Suwannee limestone formation in the Upper Floridan aquifer. His hydrogeological findings in place, Mr. Brown proceeded to perform a number of analyses using a five-layer groundwater model based on the "Mod-Flow EM" program developed by the U.S.G.S. to determine whether the withdrawals authorized by the proposed WUP would have any adverse impacts on water resources. The model's five layers simulated the five aquifer zones found in the area of Pop's. Mr. Brown performed simulations to predict the effect of the combined pumping of DID 1 and DID 3 at 1,700 gpd on a steady state basis and at 4,400 gpd for a period of 90 days. A "steady state" model assumes continuous pumping at the stated quantity forever. The scenario for pumping 4,400 gpd for 90 days is called a "transient" model, and simulates the effect of continuous pumping at the peak month quantity, without replenishment of the water source, for the stated period. Both the steady state and transient models used by Mr. Brown were conservative, in that it is unlikely that their scenarios would actually occur at Pop's. The modeling predicted that Pop's withdrawals would have no effect on the surficial aquifer or on the deep Avon Park limestone formation. Because DID 1 is likely to open to the PZ-2, PZ-3, and Suwannee limestone production zones, Mr. Brown analyzed the steady state and transient conditions for each zone. The greatest effect predicted by any of the modeling runs was a drawdown in water levels of approximately two-hundredths of a foot in the PZ-3 and Suwannee limestone zones. This drawdown would extend no farther than the boundary of Pop's property. All of the predicted drawdowns were smaller than the natural fluctuations in water levels caused by changes in barometric pressure. Thus, any possible effects of withdrawals at the quantities proposed in the WUP would be lost in the background noise of the natural water level fluctuations that occur in all confined aquifers. The water level or pressure within subterranean production zones is referred to as the "head." For water to move from one zone to another, there must be a difference in head between the zones. The evidence established that groundwater quality declines with depth at the Pop's site, but that the heads in the PZ-2, PZ-3, and Suwannee limestone production zones are essentially the same in that area. The similarity in heads means that there is no driving force to move water between the zones and thus no potential for adverse water quality changes caused by DID 1's being open to multiple production zones. In summary, the amounts of water authorized for withdrawal under the proposed permit will not cause quantity or quality changes which adversely impact the water resources, including both surface and ground waters. Adverse Environmental Impacts to Wetlands, Lakes, Streams, Estuaries, Fish and Wildlife, or Other Natural Resources Mr. Brown's model indicated there would be no drawdown from the surficial aquifer, where there would be the potential for damage to water related environmental features and/or the fish and wildlife using those features as habitat. Petitioner offered no evidence indicating that the proposed water use will cause adverse environmental impacts. Deviation from Water Levels or Rates of Flow The District has not established minimum flows or levels for the area including Pop's. Therefore, Rule 40D- 2.301(1)(d), Florida Administrative Code, is not applicable to this WUP. Utilization of Lowest Quality of Water Ninety percent of the water withdrawn from DID 1 will come from the Suwannee limestone formation and is highly mineralized and of lower quality than the water in PZ-2 or PZ- 3. DID 3 draws its water from PZ-2. As noted above, DID 3 provides water to the two restrooms on the premises of Pop's. Because its water is used in the public restrooms, DID 3 is considered a limited public supply well, the water from which must meet potable standards. Mr. Brown testified that, though PZ-2 provides water of higher quality than do the zones beneath it, that water only barely meets potable standards. Lower quality water than that obtained from PZ-2 would require extensive treatment to meet potable standards. Reuse or reclaimed water is unavailable to Pop's under any rational cost-benefit analysis. There is a reclaimed water transmission network in Sarasota County, but the nearest point of connection is more than one mile away from Pop's. The wetland lake on Pop's site is unsuitable because extensive land clearing, pipeline construction, and intensive filtration would be required to use its water. Such a project would not be technically or economically feasible for the small amount of water in question. The evidence establishes that Pop's will utilize the lowest quality water available. Saline Water Intrusion The evidence demonstrated that the proposed use will not significantly induce saline water intrusion. Saline water intrusion occurs in the Avon Park limestone formation. Withdrawals must cause a drawdown in the Avon Park formation to further induce saline water intrusion. DID 1 does not penetrate into the Avon Park formation. Mr. Brown's modeling indicated that the withdrawals allowed under the proposed WUP will not cause any drawdown in the Avon Park formation. Pollution of the Aquifer The proposed use will not cause pollution of the aquifer. As noted above, absent a difference in head or some driving force, there is no potential for water to be exchanged between the confined producing zones. Any small quantity that might be exchanged due to the pumping of the well would be removed by the same pumping. There is no potential for pollution of the aquifer by storm water moving through DID 1 or DID 3 because there is no head differential or driving force to move storm water down into the wells. The District's historic water level measurements indicated that during the rainy season, when the site is most likely to be inundated, water levels in the wells are 0.15 feet above land surface. The well structures extend at least one foot above ground level and are sealed with plates and gaskets. Adverse Impacts to Existing Off-site Land Uses The proposed use will not adversely impact off-site land uses. The District's reasonable practice, when authorizing renewal of the permit for an existing well, is to consider off-site impacts only where the applicant seeks to increase withdrawal amounts. In this case, the applicant is requesting a substantial decrease in the amount of withdrawals allowed under the renewed WUP. Adverse Impacts to Existing Legal Withdrawals The proposed use will not adversely affect any existing legal withdrawals of water. The District's reasonable practice, when authorizing renewal of the permit for an existing well, is to consider adverse impacts to existing legal withdrawals only where the applicant seeks to increase withdrawal amounts. In this case, the applicant is requesting a substantial decrease in the amount of withdrawals allowed under the renewed WUP. As noted above, Mr. Brown's modeling indicated that any drawdowns caused by these withdrawals are so small as to be lost within the natural fluctuations of water levels in the aquifer, even at the edge of Pop's 30-acre site. Petitioner's well is more than ten miles away from the wells at Pop's. Utilization of Local Resources to Greatest Extent Practicable The proposed use of water will use local resources to the greatest extent practicable, because the water withdrawn pursuant to the permit will be used on the property where the withdrawal occurs. Water Conservation Measures The proposed use of water incorporates water conservation measures. Pop's uses a commercial irrigation system with low volume misters, spray tips and sprinkler heads, and a rain gauge that automatically shuts down the system if one-eighth to one-quarter inch of rain falls. Mr. Perna testified that the automatic shutdown system rarely has the opportunity to work, because he manually shuts down the system if the weather forecast calls for rain. Mr. Perna testified that the typical golf range irrigates from 30 to 45 minutes per sprinkler head. Pop's irrigates roughly eight minutes per head. Overwatering can cause fungus on the Bermuda grass, giving Pop's a practical incentive to minimize irrigation. Pop's irrigates only the high traffic areas of the tee box and putting green, not the landing area. In its Basis of Review, the District has adopted a water conservation plan for golf courses located in the Eastern Tampa Bay Water Use Caution Area ("WUCA"). Basis of Review 7.2, subsection 3.2. Pop's is located in the Eastern Tampa Bay WUCA, and has implemented the items that golf courses are required to address in their conservation plans. Reuse Measures Given the small total irrigated area and the efficiency of the irrigation methods employed by Pop's, there is no realistic opportunity to capture and reuse water on the site. There is no reuse water realistically available from other sources. Thus, Pop's incorporates reuse measures to the greatest extent practicable. Waste Given the reduction in permitted quantities and the limited scope of the irrigation, the proposed use will not cause waste. Otherwise Harmful to District Resources No evidence was presented that the use of this water by Pop's will otherwise harm the water resources of the District. PETITIONER'S EVIDENCE Petitioner testified on her own behalf and presented the testimony of Ellen Richardson. Ms. Richardson testified that she had once seen a sprinkler running at Pop's during a rainfall, though she conceded that it had just begun to rain when she saw it. Ms. Richardson also testified that she had more than once seen sprinklers running at Pop's during daylight hours. However, Mr. Brown testified that some daytime irrigation is permissible under the District's watering restrictions, where heat stress and applications of fertilizers and chemicals make daytime watering necessary. These conditions applied to Pop's. Petitioner's chief concern was with her own well. Since the late 1980s, she has experienced intermittent water outages. The District has repeatedly worked with Petitioner on her well problems, and Petitioner feels frustrated at the District's inability to solve them. However, the District's evidence established that Petitioner's problems with water levels in her own well could not possibly be caused or exacerbated by the withdrawals at Pop's, ten miles away. To the extent that the renewal of this WUP will result in drastic decreases in permitted withdrawals, Petitioner's position would be improved even accepting her theory that these withdrawals have some impact on her well. In her petition, Petitioner alleged that there were disputed issues of material fact as to eight of the fourteen permitting criteria discussed above. While she engaged in spirited cross-examination of the District's witnesses, Petitioner offered no affirmative evidence showing that the any of the conditions for issuance of permits were not met. Petitioner's chief attack was that Rule 40D- 2.301(1), Florida Administrative Code, requires "reasonable assurances" that the permittee will fulfill the listed conditions, and that the applicant here could not supply "reasonable assurances" because of his long history of failure to comply with the conditions of prior permits. As evidence, Petitioner offered the District's historic record of this permit, which indeed was replete with correspondence from the District requesting records related to pumpage and water quality, and apparent silence from Dr. Kelly in reply. However, the record also explains that the failure to provide data was not the result of obduracy, but because farming had ceased on the property. When the less water intensive use of the driving range commenced approximately nine years ago, the owner ceased monitoring activities. The District, under the impression that farming was still taking place on the property, continued to request pumpage and water quality data for several years after the conversion. It appears from the record that Dr. Kelly, an absentee landlord, simply did not bother to respond. Dr. Kelly's past discourtesy does not rise to the level of calling into question the reasonable assurances provided in this permit renewal application, particularly where the lessee, Mr. Perna, has every reason to ensure that the conditions of the WUP are fulfilled. The evidence did not prove that Petitioner participated in this proceeding for an improper purpose--i.e., primarily to harass or to cause unnecessary delay or for frivolous purpose or to needlessly increase the cost of licensing or securing the approval of the permit renewal application. To the contrary, the evidence was that Petitioner participated in this proceeding in an attempt to raise justifiable issues as to why the permit renewal application should not be granted. In particular, Petitioner raised an important policy issue as to whether an applicant's history of failure to comply with permit conditions should be considered by the District in assessing the reasonableness of the applicant's assurances of future compliance. The District contended that the applicant's compliance history is irrelevant. While the District ultimately prevailed on the substantive issue, its procedural claim of irrelevance was rejected, and Petitioner was allowed to attempt to prove her contention as to Dr. Kelly's noncompliance. It is not found that Petitioner's litigation of this claim was frivolous.

Recommendation Upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Southwest Florida Water Management District enter a final order determining that Dr. Thomas E. Kelly has satisfied the requirements of Section 373.223, Florida Statutes, and Rule 40D-2.301, Florida Administrative Code, regarding conditions for issuance of water use permits, and that the District issue Water Use Permit No. 20005687.003 to Dr. Thomas E. Kelly. DONE AND ENTERED this 27th day of November, 2001, in Tallahassee, Leon County, Florida. ___________________________________ LAWRENCE P. STEVENSON Administrative Law Judge Division of Administrative Hearings Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative this 27th day of November, 2001. COPIES FURNISHED: Becky Ayech 421 Verna Road Sarasota, Florida 34240 Jack R. Pepper, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604 E. D. "Sonny" Vergara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (6) 120.569120.57120.595373.019373.069373.223
# 4
DESOTO CITIZENS AGAINST POLLUTION, INC. vs FARMLAND HYDRO LIMITED PARTNERSHIP, REDLAND GROWERS EXCHANGE, INC., AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 02-000232 (2002)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Jan. 16, 2002 Number: 02-000232 Latest Update: Jun. 18, 2004

The Issue Whether General Water Use Permit (WUP) Number 20012185.000 (Permit) meets the conditions for issuance as established in Section 373.223, Florida Statutes, and Rule 40D-2.301, Florida Administrative Code, and should be issued to Farmland Hydro Limited Partnership and Frank T. Basso, Jr. and Redland Growers Exchange, Inc.

Findings Of Fact The Parties DCAP is not-for-profit corporation incorporated in the State of Florida. Behrens is the President of DCAP. See also Findings of Fact 63-77. Farmland Hydro is a Delaware Limited Partnership authorized to transact business in Florida, and is the owner of the property leased by Basso/Redland, which is the subject of this WUP. Frank T. Basso, Jr., is a third generation farmer, who operates as Redland Growers Exchange, and seeks a General WUP to authorize groundwater withdrawals for crop irrigation. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries pursuant to Chapter 373, Florida Statutes, and the rules promulgated thereunder as Chapter 40D, Florida Administrative Code. The Proposed Water Use An Application for a General WUP was submitted by Farmland Hydro and Basso, as co-applicants, and received by the District on April 11, 2001. After receipt of additional information, the Application was deemed complete on October 22, 2001. The Applicants seek a General WUP to authorize a new water use for the irrigation of 140 acres for the production of both Spring and Fall row crops, using a seepage-with-mulch irrigation system.1 Basso plans to grow tomatoes and/or peppers in the Spring, and squash and/or cucumbers in the Fall. Crop planting for both seasons will be phased-in over a one-month period. Water allocation quantities are calculated on a weekly phase-in basis of approximately 35 acres for each planting date. The total time that the parcel will be in use for farming, to include planting and harvesting for each crop, is approximately six months per year. The subject parcel is part of a 250-acre tract known as the Brushy Creek Tract and is located in Hardee County approximately two miles south of the town of Ona; approximately two miles south of the intersection of U.S. Highway 64 and County Road 663; and is within the Southern Water Use Caution Area (SWUCA). The subject parcel currently does not contain a water well. The Brushy Creek Tract is a larger parcel of approximately 1,230 acres leased from Farmland Hydro by Redland and also by Parker Farms for cattle grazing, farming, and hunting. The subject parcel is used for cattle grazing and is surrounded by land owned by Farmland Hydro and used for either cattle grazing or agricultural row crops. Farmland Hydro also operates an additional approximately 1,941 acres of property near the subject parcel, which is used for citrus groves. Farmland Hydro has consumptive WUPs for this property. The closest existing legal user to the proposed Basso well site is another well on the Farmland Hydro property. As is generally done with vegetable crop production in Florida, vegetable crops grown on the Farmland Hydro property are grown in rotation with pasture, and have been rotated in this manner for many years. Typically, farmers have farmed a piece of land for one, two or three years and then, to avoid the buildup of insects and diseases, have allowed the land to revert to pasture and have moved on to another field for crop production. The subject parcel for which the WUP is being sought will be similarly treated. Crop rotation is an important agricultural best management practice that is used to address pest management, soil conservation, and maximizing nutrients for obtaining favorable crop production. Soil conservation is important to Basso, notwithstanding that there is a response in the Application that no approved Soil Conservation Service plan exists for the operation included in the Application. If the WUP is issued and the subject parcel is placed into crop production, another parcel of land will be taken out of crop production by Basso, resulting in the discontinuation of another permitted well. As a result, the issuance of this WUP will not result in a "water use change." Determination of Reasonable Demand/Allocated Quantities In determining whether a proposed water use is reasonable-beneficial and in the public interest, the District calculates the appropriate permit quantities for the particular water use, which is a function of demonstrated need, or demand for water; efficiency of the water treatment and distribution systems; whether water is sold or transferred to other entities; whether acceptable water can be acquired from lower quality sources; and whether conservation practices are employed. District Basis of Review (BOR), page B3-1. The reasonable need for agricultural water use is generally composed of one or more demand components, depending upon the specific agricultural use. "Typically, the reasonable need for irrigation water uses is equal to the supplemental crop requirement divided by the system efficiency or the system design capacity, whichever is less." "The supplemental crop requirement is the amount of water needed for a particular crop beyond the amount of water provided by effective rainfall." The supplemental crop requirement is generally determined by using the Agricultural Water Use Calculation Program (AGMOD) Version 2.1, which is based on the modified Blaney-Criddle method. This program takes into account site specific information such as crop type, growing period, evapotranspiration rate, soil type, rainfall, irrigation method and number of irrigated areas. "In most cases, the supplemental irrigation requirement is determined for a 2 in 10-year drought condition." The AGMOD program determines an inch-application rate which, when applied to the number of acres to be irrigated, results in a calculation of total annual average and peak monthly quantities for the proposed water use. District BOR, pages B3-4 and 3-5. See also District Water Use Design Aids, pages C4-1 through C4-7. In determining the allocated quantities, or reasonable demand for water, the District seeks to avoid both over- allocating water and under-allocating water for the specific crop intended, to ensure that the permitted amount is sufficient for the "2 in 10-year drought condition." Consequently, the allocated quantities arrived at by District staff through use of the AGMOD methodology may be different from the quantities indicated on an applicant's initial application, which are generally estimated without benefit of an agricultural water use calculation program. The AGMOD program was used to calculate water use quantities for the proposed water use. The allocated quantities for Basso's proposed use are 454,000 gallons per day (gpd) on an annual average basis and 1,241,000 gpd, as a peak month quantity. No quantities were requested or allocated for crop protection. See Finding of Fact 52. Modeling for Simulated Impacts As part of the application review process, the District evaluates potential impacts to existing legal uses of water, the water resources and environmental features that may result from the proposed groundwater withdrawals. To assist in the review process, analytical and numerical models, which incorporate best available hydrogeologic parameters for the area being considered for a permit, are used to simulate drawdowns for the withdrawal of the proposed quantities. The results of these simulations are used in the evaluation of potential impacts to assess whether the application meets the conditions for issuance. The District undertook simulation modeling of the potential effects of the proposed water withdrawals to be authorized by the permit. The allocated quantities were entered into the MODFLOW 387 groundwater flow model, which is a three- layer model developed by the U.S. Geological Survey and is the generally accepted model for this purpose. Model layers were set up to represent the surficial, intermediate, and Upper Floridan aquifers. (The Applicants seek to pump water solely from the Upper Floridan Aquifer.) There are limitations to the model in that the model assumes a homogeneous isotropic aquifer, with no preferred flow direction. In actuality, there is variability in the geology of the area. Modeling is intended to serve as a screening tool for assessing localized impacts anticipated from a proposed water use and is based upon the best available information. As distance from the proposed withdrawal site increases, the reliability of the modeling decreases, due to the variability in the geology and other parameters or boundary conditions that can affect the model. Use of the MODFLOW groundwater model allows the District to look at potential impacts at the site, and in the proximity of the site, and assists the District in assessing possible cumulative impacts associated with a proposed use. To assist in assessing potential impacts from the proposed use, a Peak Month modeling simulation was undertaken by the District, which simulates the effect of pumping the proposed Peak Month withdrawal rate of 1,241,000 gpd for 90 consecutive days, with no recharge to the aquifer systems. The model essentially presents a worst case scenario that is a more severe prediction than what is actually likely to occur from the permitted use under normal conditions. Simulating the period of greatest demand on the hydrologic system is likely to provide maximum protection to existing legal water users and the water resources. The Peak Month simulation undertaken by the District predicts drawdowns in the potentiometric surface of the Upper Floridan Aquifer of approximately 2.6 feet at the proposed withdrawal site; less than 1.4 feet at the nearest property boundary (approximately 1,250 feet from the proposed withdrawal site); and less than 1.2 feet at the nearest existing legal user (a Farmland Hydro well approximately 3,500 feet from the proposed withdrawal site). These numbers did not raise a concern for District staff. ("Potentiometric surface" is "a surface defined by the level to which water rises in an open pipe that is constructed into or all the way through an artesian aquifer. This is measured in feet relative to NGVD or sea level. The level to which water rises inside this open pipe is a function of the pressures on the water in the artesian aquifer." District BOR, page B-xii.) The Peak Month simulation predicts drawdowns in the intermediate aquifer of approximately 0.9 feet at the proposed withdrawal site, and less than 0.9 feet at the property boundary, and at the nearest existing legal user. The Peak Month simulation predicts drawdowns in the water level of the surficial aquifer (water table) of approximately 0.01 feet or less at the proposed withdrawal site, property boundary and nearest existing legal user. Based upon the Peak Month simulations, the District reasonably determined that further cumulative impact modeling was not necessary in order to assess localized cumulative impacts resulting from the proposed use. To assess regional cumulative impacts, the District evaluated Regional Observation Monitoring Program (ROMP) data and found no significant trends in withdrawals in recent years, other than a slight decline attributed to the recent drought. Conditions of Issuance of the Proposed Permit In order to obtain a water use permit, an applicant must establish that the proposed use of water is a reasonable- beneficial use, will not interfere with any existing legal use of water, and is consistent with the public interest, by providing reasonable assurance, on both an individual and cumulative basis, that the water use meets the conditions for issuance as specified in Section 373.223(1), Florida Statutes, and Rule 40D-2.301, Florida Administrative Code. A permit must be obtained from the District prior to withdrawing water, where the withdrawal is from a well having an outside diameter of six inches or more at land surface, where the annual average withdrawal from all sources is 100,000 gpd or greater, or where the total combined withdrawal capacity from all sources is greater than or equal to 1 mgd. The proposed water use falls within these parameters. Rule 40D-2.041(1)(b) and (c), Florida Administrative Code. The quantities allocated for the proposed use have been determined by the District to be necessary to fulfill a certain reasonable demand, for the reasons specified herein. To assist in assessing impacts, the District utilizes a network of ROMP wells to obtain basic groundwater monitoring data over time and to help characterize the lithology, stratigraphy, aquifer depths, water levels and, in some cases, water quality for the various water resources. Data obtained from the ROMP and other wells is compiled to ascertain aquifer characteristics within the District and is also integrated into the District's modeling efforts pertaining to proposed water uses. ROMP well No. 31 is located just off the northeast corner of the Basso site. Having a ROMP well adjacent to the Basso site increases confidence in the specific geological information being used in the groundwater model to assess potential impacts from the proposed uses. ROMP well No. 17 is located approximately 1/2 mile from DCAP member Behren's well. Data from both wells were considered in assessing potential impacts from the proposed water use. Based on available information, the possible sources of groundwater for the proposed use at the Basso site are the surficial aquifer, intermediate aquifer, and the Upper Floridan Aquifer systems. To ensure sufficient quantities of water for the proposed use and to avoid potential impacts to environmental features, such as wetlands and surface waters, the District will require the proposed use to limit withdrawals to solely the Upper Floridan Aquifer. By examining stratigraphic cross sectional information generated from the ROMP wells, particularly ROMP No. 31 well, which is in close proximity to the Basso site, District staff were able to determine, with reasonable certainty, the approximate depths of the aquifers at the Basso well site. To ensure that the well will be open solely to the Upper Floridan Aquifer, the permit requires the Basso well to have a minimum of 400 feet of casing, with an estimated well depth of 1,000 feet. Based upon available information concerning the construction of other wells in the vicinity of the proposed Basso well, the District is reasonably assured that a well cased for a minimum of 400 feet will draw water only from the Upper Floridan Aquifer and will minimize the potential for water to move between the aquifers through the well. The well construction requirements imposed for Basso's well are in line with the best available stratigraphic information and with known construction of wells in the area. By casing the well to a depth of 400 feet and due to the extremely low leakage of the intermediate confining unit, the intermediate and surficial aquifers will be buffered from impacts associated with the proposed use. The District will deny a water use permit application if the proposed withdrawal of water, together with other withdrawals, would cause an unmitigated adverse impact on a legal water withdrawal existing at the time of the application. The District considers an adverse impact "to occur when the requested withdrawal would impair the withdrawal capacity of an existing legal withdrawal to a degree that the existing withdrawal would require modification or replacement to obtain the water it was originally designed to obtain." District BOR, page B4-14. Based upon an assessment of individual and cumulative regional information, there are no existing legal uses of water that will be adversely impacted as a result of the proposed withdrawals. Based upon an assessment of individual and cumulative regional information, no quantity or quality changes that adversely impact the water resources, including both surface and groundwaters, are anticipated from the proposed withdrawals. The District requires that consideration be given to the lowest water quality available, which is acceptable for the proposed use. Lower quality water includes reclaimed water, collected stormwater, recovered agricultural tailwater, saline water or other sources. District BOR, page B4-12. For the proposed water use, there is no viable lower quality water source and no reclaimed water available near the site to use as an alternative to groundwater pumping. The Applicants are proposing to use the lowest quality water that is available. There are no known concerns regarding the quality of water in the Upper Floridan Aquifer at this location in Hardee County. Restricting the proposed water use to the Upper Floridan Aquifer will not cause water quality concerns or result in pollution to any of the aquifers. Simulated drawdowns to the Upper Floridan Aquifer of approximately 2.6 feet at the proposed withdrawal site, less than 1.4 feet at the nearest property boundary, and less than 1.2 feet at the nearest permitted well, provide reasonable assurance that adverse impacts will not occur from the proposed water use. Simulated drawdowns to the intermediate aquifer of 0.9 feet at the proposed withdrawal site, and less as the distance from the proposed withdrawal site increases, provide reasonable assurance that adverse impacts will not occur from the proposed water use. Simulated drawdowns to the surficial aquifer of 0.01 feet or less at the proposed withdrawal site, and less as the distance from the proposed withdrawal site increases, constitute a nearly undetectable impact to the surficial aquifer, which is not an adverse impact. The modeling simulations demonstrate that the proposed withdrawals will have no significant effect on the surficial aquifer and, therefore, will not cause adverse impacts to environmental features such as wetlands, lakes, streams, fish and wildlife, or other natural resources. None of the simulated drawdowns are considered to be predictions of adverse impacts, not even in the localized vicinity of the well site. Mr. Jackson explained that because the localized modeling simulations were small or insignificant and showed no adverse impacts, cumulative modeling is not considered necessary. Reasonable assurance on a cumulative basis is determined by assessing the potential localized impacts in conjunction with existing cumulative data for the region, such as the available ROMP data and hydrographs, which depict the existing regional condition, taking into account, on a cumulative basis, all existing uses as well as rainfall conditions and climate. Based on an assessment of the cumulative data and the modeling for individualized impacts, and applying professional judgment, District staff reasonably concluded that the proposed water use presents no concerns that it will cause, on either an individual or a cumulative basis, adverse impacts to the water resource or existing legal uses. Minimum flows and levels have not been established by the District for the area where the proposed use is located. (The parties stipulated that the District has not established minimum flows and levels pursuant to Section 373.042, Florida Statutes, for the Southern Water Use Caution Area (SWUCA)). Therefore, Rule 40D-2.301(1)(d), Florida Administrative Code, (requirements for minimum flows and levels), is not applicable to the proposed permit. The proposed use presents no concerns for saline water intrusion. The proposed use raises no concerns regarding causing pollution to the aquifer. There are no offsite land uses that will be adversely impacted as a result of this permit. Basso currently uses best management practices for water conservation in his ongoing farming operations, and intends to use such practices with the new farming operation authorized under the permit. In keeping with such practices, irrigation is stopped when the water reaches the end of the watering ditch. Basso uses seepage irrigation and tries to regulate the ditches so that there is a minimum, if no, runoff. Also, a watering cycle generally lasts from three to seven days before irrigation has to be resumed. Any runoff goes into "filtering ponds, before reaching ditches or creeks" in its raw content. Basso does not intend to farm during months of likely frost so no separate allocation for frost/freeze protection was requested or needed. Given these irrigation practices, water is not reasonably expected to be wasted. All necessary and feasible agricultural water conservation activities will be implemented upon issuance of the WUP. In addition, Specific Condition No. 3 of the proposed WUP requires the incorporation of best water management practices in all irrigation practices. The proposed use presents no concerns that it will otherwise be harmful to the water resource. The Applicants have met all the requirements for issuance of a WUP. Southern Water Use Caution Area The proposed water use site is located within the SWUCA. The District established the SWUCA as a means of addressing on a regional scale concerns about long-term impacts to the water resource. Water use caution areas were created in recognition of regional water concerns. There have been drought conditions in the area which have caused reduced aquifer levels. The proposed water use site is not within the "Most Impacted Area" (MIA), which is located approximately 18 miles to the west of the site in Manatee County, nor within the "East Tampa Bay Water Use Cautionary Area" (ETB WUCA), which is approximately six miles to the west of the proposed site, also in Manatee County. (The SWUCA includes the MIA and ETB WUCA.) Pending final adoption of rules for the SWUCA, the District will continue to issue WUPs for proposed water uses that meet the conditions for issuance. The District cannot treat new uses and existing renewal uses any differently when considering the issuance of a permit. Once SWUCA rules and minimum flows and levels are established, the District expects to rely on a more regional approach to address long-term cumulative impacts over the entire use caution area, instead of relying on a permit-by-permit basis to address regional concerns. Standard Condition No. 9 of the proposed WUP requires the permittee to cease or reduce withdrawals as directed by the District, if water levels in the aquifers fall below the minimum levels established by the District Governing Board. The proposed withdrawal will use a seepage with mulch irrigation method, which has a 50 percent efficiency level. See footnote 1. This is the minimum efficiency level currently required for agricultural WUPs within the SWUCA, which approve the use of this irrigation method. As SWUCA rules come into effect, a higher percentage efficiency level probably will be required, as is now required in the Eastern Tampa Bay Water Use Caution Area and also in the Highlands Ridge Water Use Caution Area. Consequently, Standard Condition No. 11 of the proposed WUP requires that, when SWUCA rules are implemented, the permittee must comply with any higher efficiency level or other special regulation that may be required for the SWUCA area. DCAP's Challenge to the Proposed WUP DCAP does not keep official membership records. It does not maintain any list of current members. According to Behrens, there are five members of the board of directors. DCAP does not hold corporate meetings, annual meetings or maintain corporate records. Members do not meet. There are no means to document the existence of members for this organization. Behrens is a member of DCAP. He has owned five acres adjoining the west side of Horse Creek (in DeSoto County) since 1985. Behrens complains that the District does not look at the cumulative effect on his well and other people he knows, such as George Chase. Behrens is concerned with any lowering of the water level in the area, including Horse Creek. He believes that approval of wells in the area, including the proposed well, is the straw that is breaking the camel's back. Mr. Chase shares this view. Behrens relies on an artesian free-flowing, two-inch diameter well, for domestic water use, located in the intermediate aquifer, approximately 150 feet deep. (Behrens' well is approximately 18-20 miles from the proposed Basso well.) For most of the time he has lived there, the well had an electric pump for obtaining water. Approximately one year ago, the pump went bad, and a replacement system has not been installed. Currently, Behrens has no pump on the well, and in dry periods, has to obtain water for domestic uses from nearby Horse Creek, which is low during the dry season. (Behrens depends on Horse Creek to pursue his recreation, wildlife, and aesthetic values.) Having a flowing artesian well will enable him to obtain water from the well without having to install an electrical pump, a situation which is desired by Behrens, in part, because the property is in a flood plain and experiences frequent flooding and electrical outages. Not all artesian wells flow. Artesian wells are completed into confined aquifers in which the water in a tightly cased well, will rise to a level above the formation being measured. Water would have to rise above the land surface to be a flowing well. For a well to be artesian, the well must be under confined pressure. For a well drawing water from a confined aquifer, such as the intermediate or the Upper Floridan Aquifer systems, the measured water level in the well is a reflection of the amount of potentiometric pressure in the well. This level can be affected just as much by the amount of recharge as it can by the amount of water withdrawals. There is no evidence that the proposed water use will adversely impact the flowing nature of either Behrens' or Chase's well. The evidence demonstrates that the proposed water use will not adversely impact Behrens' well. George Chase is a member of DCAP. Mr. Chase lives in Arcadia, DeSoto County, Florida. His property is adjacent to the Peace River. Mr. Chase's well is a two-inch diameter well, believed to be about 150 feet deep and equipped with a 12-volt DC solar-powered pump. Mr. Chase has in the past relied on artesian pressure within the confined intermediate aquifer to supply water to his solar-powered home. The solar-powered pump assists in supplying water to the home. In recent years, Mr. Chase has experienced low water pressure in his well. In Spring 2000, Mr. Chase contacted the District to complain that when an adjacent citrus grove was irrigating the groves, it appeared to affect the water level in his well such that the well's ability to flow was impacted. (According to Mr. Chase, his neighbors have had problems obtaining sufficient water from their wells and reaching water with standard pumps.) This citrus grove is an existing legal user of water that pre-existed Mr. Chase's well. In recent years, numerous domestic wells have been constructed in the vicinity of the Chase home that are large diameter wells utilizing submersible pumps with 110-volt AC power. These wells are more efficient at producing water than the type of well and pump being used by Mr. Chase, are located within a few hundred feet of Mr. Chase's well, and are open to the intermediate aquifer as is the Chase well. Based upon the District's experience in other areas, where there is a cluster of domestic wells drawing from the same intermediate aquifer, such adjacent wells have a much greater impact on each other than do other more distant wells, such as the previously discussed citrus irrigation wells, that are open solely to the confined Upper Floridan Aquifer System. This conclusion is based upon monitoring of the ROMP sites in the affected areas. Mr. Chase's well is approximately ten miles from the proposed withdrawal site. There is no basis to conclude that the proposed water use will cause any adverse impacts to Mr. Chase's well. DCAP members' interests are not affected any differently by the proposed use than are the interests of the general public. DCAP has produced no evidence to support its assertion that the issuance of this permit will result in lowered water levels in the Horse Creek and Peace River or other surface waters. DCAP has produced no evidence to support its assertion that the permit will cause adverse impacts to surface water flows or surface waters or to environmental features such as vegetation, fish, and wildlife. DCAP has produced no evidence that its substantial interests are affected by the proposed agency action.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Southwest Florida Water Management District enter a final order: Determining that Farmland Hydro Limited Partnership and Frank T. Basso, Jr. and Redland Growers Exchange, Inc., have satisfied the requirements of Section 373.223, Florida Statutes, and Rule 40D-2.301, Florida Administrative Code, regarding conditions for issuance of WUPs;3 Issuing proposed General Water Use Permit No. 20012185.000, as set forth in District Exhibit No. 4; and Finding that DCAP lacks standing to challenge the issuance of the permit. DONE AND ENTERED this 3rd day of June, 2002, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 3rd day of June, 2002.

Florida Laws (6) 120.569120.57373.019373.042373.223403.412
# 5
CLAY ISLAND FARMS, INC. vs. ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 82-002517 (1982)
Division of Administrative Hearings, Florida Number: 82-002517 Latest Update: Oct. 13, 1983

The Issue The issues presented in this matter concern the request by the Petitioner to be granted a management and storage of surface waters permit by Respondent. Respondent proposes to deny the permit based upon the perception that the activities contemplated by Petitioner: (1) are not consistent with the public interest as envisioned by Section 373.016, Florida Statutes, and 40C- 4.301(1)(b), Florida Administrative Code, (2) are not a reasonable and beneficial activity, per Section 40C-4.301(1)(a), Florida Administrative Code, alter the peak discharge rate of runoff from the proposed activity or the downstream peak stage or duration for the 1 in 10 year design storm, per Section 40C-4.301(3)(a), Florida Administrative Code, (4) cause an increase in velocity or flood stage on lands other than those owned, leased, or otherwise controlled by the applicant for the design storm, per Section 40C-4.301(3)(b), Florida Administrative Code, (5) cause an increase in flow or stage such that it would adversely affect lands other than those owned, leased, or otherwise controlled by the applicant, per Section 40C-4.301(3)(c), Florida Administrative Code. 1/

Findings Of Fact A predecessor applicant had requested permission to construct and operate the water management system which is the subject of this controversy. The approximate acreage involved was 197 acres in Lake County, Florida. This acreage and requested activity was subject to the regulatory requirements of St. Johns River Water Management District. Clay Island Farms, Inc., hereinafter referred to as CIF, was substituted for the initial applicant and this matter has been litigated before the Division of Administrative Hearings on the continuing application of the Petitioner. The permit application number is 4- 8089. This application was considered with application number 4-8088, pertaining to property owned by A. Duda and Sons, Inc. Subsequently, the latter application shall be referred to as the Duda request for permit. Certain additional information was sought by Respondent from the applicants, CIF and Duda, in the permit review, by correspondence dated October 2, 1981. A copy of that correspondence may be found as Petitioner's Exhibit No. 16 admitted into evidence. In particular, CIF was requested to prepare pre and post-development runoff rates in the 1 in 10, 1 in 25,and 1 in 100-year storms, to include stage-storage and stage-discharge rates for any and all retention facilities within the project design. Petitioner's Composite Exhibit No. 1 admitted into evidence contains a copy of the engineering report by CIF which are CIF's responses to the request for information. The date of the engineering report is July 12, 1982. The CIF application, as originally envisioned, called for the construction of exterior and interior ditches to be placed around a dike of 71 feet MSL elevation. The dike would enclose a proposed farm operation of approximately 197 acres, should the permit be granted. Within that 197 acre plot, would be found numerous drainage ditches to include major ditches and minor arterial ditches. The purpose of those ditches found in the 197 acres would be to serve as a conveyance for rainfall runoff. The system of conveyance would be connected to an existing conveyance system already in place and related to farm operations of A. Duda and Sons. The runoff would be eventually placed in a retention pond and at times discharged from that retention pond or basin into Lake Apopka by means of gravity flow. The particulars of the development of the 197 acre plot and its service dike, canals, and ditches are more completely described in Petitioner's Exhibit No. 1, which is the engineering report for the surface water management permit application. The CIF application was reviewed by the staff of the Respondent. Recommendation was made to deny the permit. Details of that denial may be found in Respondent's Exhibit No. 1. In the face of the denial, CIF requested an administrative hearing. This request was made on August 27, 1982, by petition for formal Subsection 120.57(1), Florida Statutes, hearing to determine Petitioner's entitlement to the requested permit. St. Johns River Water Management District, in the person of its governing board, determined to refer this matter to the Division of Administrative Hearings to conduct the formal proceeding and the request for the assignment of a hearing officer was received by the Division on September 13, 1982, leading to the final hearing in this cause. During the course of the final hearing, the CIF permit application was modified in a fashion which reduced the amount of acreage sought for cultivation. Now, approximately 122 acres would be farmed per the amended proposal. A general depiction of the design of the project in its amended form may be found in the engineer's sheet, which is Petitioner's Exhibit No. 20 admitted into evidence. When contrasted with the engineering drawings set out in Petitioner's Composite Exhibit No. 1, the new design is essentially the same as contemplated in the original permit application, on a lesser scale. Other than dimensions, the basic concepts of the CIF operation would remain the same under the amended proposal. At present, Petitioner proposes to remove the vegetation which covers the subject 122 acre plot and to conduct a muck farming operation. That vegetation is mostly mixed hardwood with the primary species being red maple. The soil in this area is constituted of monteverde muck, which is conducive to the production of corn and carrots, the crops which Petitioner would plant, to prepare the land for the operation, the system of ditches dikes and canals described would be installed following the cleaning, draining, and leveling of the 122 acres. Petitioner's Exhibit No. 10 admitted into evidence depicts land which has been cultivated and the subject 122 acres in its undisturbed state. Petitioner's Exhibit No. 4 admitted into evidence shows the overall CIF area is outlined in red, except for its southerly extent, which carries a red and yellow line on the exhibit. This exhibit depicts Wolfshead Lake which is a small interior lake in the southeastern corner of the overall CIF property. The yellow line in the middle of the CIF property represents, the location of a former north-south canal. The westernmost north-south reach, which is shown with a red line, depicts a canal which runs north from Wolfshead Lake into the existing Duda system of canals and ditches. The Duda operation has attempted to plug that north-south canal on the western fringe to stop the flow from the area of Wolfshead Lake, but has been unsuccessful and the water still enters the Duda farm ditches and canals. In the 1940's and early 1950's, the CIF property had been partially developed for a cattle operation and truck farming. Those canals, as described before, were installed, together with the diagonal yellow line on Petitioner's Exhibit 4, which represents a canal that was built with an axis running northeast and southwest. In addition, there was a centrally placed east-west canal and a slough running from Wolfshead Lake in a southeasterly direction. The slough is still there, although water that might be diverted from the Wolfshead Lake area into the slough is flowing north in the westerly north-south canal at present. If the project were allowed, most of the water flowing in and around the Wolfshead Lake would be introduced into the slough and from there exit to Lake Apopka. The center north-south canal and the interior east-west canal, together with the diagonal canal, are not in operation at present. The center north-south-canal would become the approximate eastern boundary of the 122 acres with the western north-south canal representing the approximate western boundary of the 122 acre plot. The northern boundary of the CIF property is constituted of an east-west canal which is part of the present Duda system. This is the only one of the canals associated with the former farming operation on the CIF property which is part of any maintained system of conveyances presently in existence. Approximately 1,000 acres are being farmed by Duda and Sons in property north of the proposed project. The Duda permit application, 4-8088 as granted, is described in Petitioner's Exhibit No. 13 which is a copy of the permit. This acreage is generally found to the northwest of the CIF plot, and would allow an additional 300 acres to be farmed in that muck area, on land which has been cleared for the most part and/or which has an elevation predominantly above 68.5 feet MSL. Eighty acres of the proposed Duda permit application was denied based upon the fact that it had not been cleared prior to the Duda permit application and in consideration of the amount of the 80 acre segment which lies below 68.5 feet MSL. The elevation 68.5 feet MSL represents the flood plain for the 1 in 10 year rainfall event for Lake Apopka. The area of the Duda permit is depicted on Petitioner's Exhibit No. 4 and outlined on that exhibit with lines of green and yellow at the southern end, green and yellow and red and yellow on its western flanks, red at the north end and by red on the east side, together with a Duda drainage ditch, which runs north from the terminus of the north-south drainage ditch coming from Wolfshead Lake and the east-west drainage ditch at the northern extent of the CIF property. Exhibit No. 4 was made prior to clearing operations depicted in Petitioner's Exhibit No. 10 and that letter exhibit is a more correct indication of the appearance of the new Duda permit property today. A green diagonal line running northwest and southeast intersecting with a line running east-west and a line running north-south depicts the approximate part of the 80 acres, which lies below 68.5 feet MSL, as shown in Petitioner's Exhibit No. 4. Farm operations, in keeping with the authority of Permit No. 4-8088, have not commenced. If the CIF permit application is successful, the original 1,000 acres, approximately 300 acre area of the Duda permit and the 122 acres of CIF, would be tied in by a system of conveyance ditches or canals allowing the interchange and transport of water through and around the three farm areas. The existing retention pond would be expanded to accommodate the additional farm acreage. The Petitioner is willing to increase the present retention pond to a design capacity which would equal one acre of basin for each ten acres of farm land, at the place in time when all three elements of the muck farm operation were under way. This again pertains to the existing 1,000 acres, the approximately 300 acre recent Duda permit, and the 122 acres related to the CIF application. With the addition of the CIF acreage, when water in the ditches reached 67.1 feet MSL, this would cause the engagement of a 40,000 GPM pump allowing the ditch water influent into the retention pond. The pump automatically would shut off at any time the water level in the access ditches to the pond dropped below 61 feet MSL. The primary purpose of the retention pond is to make water available for irrigation of crops, in its present state, and as contemplated with the addition of the CIF project. The pond does and would detain farm water for a period of about a day allowing the settling out of certain nutrients which are in particulate form. The existing pond and in its expanded form does not and would not filter nutrients which have been dissolved and have become a part of the water column. At times of high incidence of rainfall, when the crops are inundated with water for a 48-hour period of time, the retention pond is now designed and as contemplated by the addition of the CIF farm land, would allow for the discharge of effluent into Lake Apopka through two discharge culverts. The discharge is by means of gravity through an adjustable riser system. The retention pond as presently designed and as contemplated in its expansion has established the height at which water would be released from the retention pond into Lake Apopka through the riser at 68 feet MSL. The occasion of high incidence of rainfall occurs during the normal rainy season in a given year. Discharge could also be expected in the 1 in 10 year, 24hour storm event. During that storm event or design, Lake Apopka would rise to a level of 68.54 feet MSL, a level which would correspond to the 10year flood plain. Whether in the pre or post-development phase of the 122 acres, waters from that acreage would be discharged during the course of the storm through culverts leading from the retention pond into Lake Apopka. This process would continue until the gravity flow stopped at the moment where the water level in the pond and the water level in Lake Apopka adjacent to the discharge culverts achieved equilibrium of elevation. At that point in time, the gravity flow or discharge from the retention basin would cease, there no longer being a positive gradient from the detention pond to Lake Apopka. There will be some amount of discharge in the 24-hour storm event through the culverts at the retention pond either in the pre or post-development phases of the project, because, at present, the western most north-south ditch, which is found at the western boundary of the CIF property, allows water to flow north into the present Duda ditch system, water which has fallen on the 122 acres in question. From the ditch system, that water finds its way into the retention pond and thus into the lake. The contemplated system to be installed with the 122 acres at build-out would also allow water from the 122 acres to go through a system of conveyances and to the retention pond and from there into Lake Apopka. Although considerable testimony was presented by both parties on the subject of comparing pre-development and post-development peak discharge rates of runoff from the proposed activity, in the 1 in 10 year, 24-hour storm design or event, neither party has satisfactorily proven the dimensions of the pre-development and post-development peak discharge rates of runoff from the proposed activity. This determination is made having reviewed the testimony and the exhibits in support of that testimony. Notwithstanding a lack of proof of this differential with exactitude, it has been shown by the testimony and exhibits that the post- development peak discharge rate of runoff in the 1 in 10 year, 24-hour design storm or event can be expected to exceed that of the pre-development rate. On the associated topic of the ability of the post-development design to accommodate the differential in peak discharge rate of runoff between pre- development and post-development, Petitioner has failed to establish this proof. The modeling that was done by the Petitioner, in an effort to depict the differential as 10 acre feet with an available capacity of attenuation approximating 26 acre feet within the system of ditches, is not convincing. Nor has petitioner shown that there is sufficient storage in the retention pond, in the course of the storm event. The data offered in support of Petitioner's position does not sufficiently address accommodation of the drainage from areas surrounding the 122 acres in question, which are not part of the Duda system; the amounts of water already found in the system of ditches and canals at the onset of the storm event; the amount of water located on the crops at the onset of the storm event, which would have to be removed; and the amount of water already found in the retention pond at the time of the storm event. During the 1 in 10 year 24-hour storm, the CIF 122 acres will be protected by the 71-foot MSL dike, in that the expected elevation of Lake Apopka would not exceed 68.54 feet MSL. The dike would also protect the 122 acres in the 25, 50, and 100-year, 24-hour storm events whose elevations are anticipated to be 68.98, 69.28, and 69.56 feet MSL, respectively. As a consequence, an increase in flood stage would occur on lands other than those controlled by CIF. The amount of increase in flood stage would be approximately .046 inches during the 1 in 10 year storm, and an increasingly greater amount for the larger storms. It was not established where the amount of water which could not be staged on the 122 acres would be brought to bear through the surface flow on the 31,000 acres of water which constitute Lake Apopka. Nonetheless, that water could be expected to increase the flood stage on lands other than those of the Applicant. Possibly the dikes protecting the muck farms on the northern side of Lake Apopka could be influenced by the .046 inches in elevation due to the forces associated with the 1 in 10 year storm event, such as winds and movement of the water in the lake. This is true, notwithstanding the fact that the design goal of the dikes in the area is 71 feet MSL. The dikes are constituted of muck and are susceptible to overtopping, erosion, or blowout. By history, there have bean dike failures in the northern end of Lake Apopka, and associated increases in stage or flood stage. This incremental increase in water level in the 1 in 10 year storm event, due to the CIF development, when considered in the context with the other influences of that storm event, could possibly be the determining incident leading to dike failure in the northern perimeter of Lake Apopka. However, given the history of dike failures, prior to this potential loss of the storage area on the applicant's property, it has not been shown that the proximate cause of dike failure in the 1 in 10 year storm could be expected to be the contribution of an additional .046 inches of water on the lake surface. Those failures existed prior to the potential for the addition of water and were the result of inadequate maintenance of a structure which demanded a better quality of attention. Nonetheless, the additional amount of water could be expected to exacerbate the extent of a dike breach in any 1 in 10 year storm event that occurred subsequent to the development of the CIF 122 acres. In summary, the likelihood that the increase in elevation of water caused by the loss of storage on the subject property will be the critical event that causes a dike failure is not accepted. A dike could breach because of the influence of the storm even itself, without regard for the incremental increases in water elevation due to loss of water storage on the CIF property. The poor condition of some dikes due to less than adequate design or maintenance, would promote that dike failure and be exacerbated to the extent of more water being introduced on that property through the incremental amount of increase due to loss of storage on the CIF property. The dike failure circumstance in and of itself would not be sufficient to deny the permit application; however, the applicant had the burden of addressing the possible problem of increases in stage or flood stage on other properties, not its own, which are not protected by dikes. This showing was not made by the applicant, notwithstanding the fact that an increase in stage or flood stage could be expected to occur on property fronting Lake Apopka, which property is not protected by any form of artificial barrier. The installation of the protective dike aground the 122 areas of the CIF property in the 1 in 10 year design storm and potentially at times of lesser rainfall events, could be expected to increase the stage or flood stage on lands unprotected by dikes and thereby adversely affect lands other than those controlled by the applicant. Most of the 122 acres and the property to the east of that development and a portion of the undeveloped 80 acres in the recent Duda permit would be inundated in the 1 in 10 year storm event, prior to development. This is true because the elevation of much of that property is approximately 67.5 foot MSL. During the 1 in 10 year storm event, it would store approximately one foot of water, as presently constituted. It could also be expected to be inundated on an average of approximately once in two years. Lake Apopka is a part of a controlled system of lakes known as the Oklawaha River chain of lakes. Respondent regulates the water level in that chain of lakes by operation of a lock on the Apopka-Beauclair canal. The maximum desirable elevation of 67.5 feet MSL for Lake Apopka is a part of the regulation schedule found in Respondent's Exhibit No. 2 admitted into evidence. In the 1 in 10 year or better storm event, the Apopka-Beauclair system could not draw down the surface water at a rate faster than 27 days per foot, even assuming the lock was fully open to flow. Consequently, those properties that were suffering an, increase in flood stage on their surface could not expect to gain prompt relief through the regulation of waters in the Oklawaha River chain of lakes. Lake Apopka is an hyper-eutrophic lake. Although it is classified as Class III water body (ambient water quality) within the meaning of Section 17- 3.161, Florida Administrative Code, it fails to match that classification in terms of its actual water quality. This is as a consequence of its highly eutrophic state, brought about by the age of the lake and the contributions of man. Some of the contributors to the eutrophication have been removed from the lake area and water quality has improved. Those facilities removed were sewage treatment and citrus processing plants around the Lake Apopka rim. The muck farms remain and the quality of the water in the retention basins or ponds when compared to the receiving waters of Lake Apopka is similar in nature. Consequently, the receiving waters are not enhanced in their water quality when the retention ponds discharge water into Lake Apopka. As stated before, the retention ponds do not have as their primary purpose the treatment of water. Any water quality improvement is a secondary function of the retention pond. The retention ponds do improve the water somewhat, as described, and are adequately sized to fulfill that partial cleansing. Whether the water quality in Lake Apopka would ever improve sufficiently to allow Lake Apopka to become a more diversified habitat for fish and wildlife is not certain, even if all contributing discharges of pollutants were curtailed, to include the discharge of water from the muck farms with its high nutrient loads. Nonetheless, Lake Apopka cannot accomplish the recovery if the effluent from the muck farms continues to be introduced into the lake with the present constituents found in the water. Out of concern for the water quality in Lake Apopka, officials of the University of Florida have conducted experiments on nutrient removal which they hoped would approximate the quality of removal accomplished by transitional vegetation and swamp. (The 122 acres at issue and the western and eastern adjoining property are constituted of these water treatment zones.) This experiment of nutrient removal through use of retention ponds calls for the retention of the muck farm water for a period of six days allowing settlement of particulates and for the vegetation within those experimental retention basins to uptake dissolved nutrients. Several types of vegetation are used to gain a better quality of nutrient uptake add the vegetation is harvested every six to eight weeks to improve that performance. The experiment has shown that the quality of water discharged from the ponds utilized by the University of Florida was comparable in its quality to the natural wetlands system water discharge. The natural wetlands discharge is of a better quality than the receiving waters. Unlike the university experiment, the pond contemplated by CIF primarily emphasizes detention for a shorter period of time than was used in the experiment and allows highly eutrophic water to be mixed with that quality of water already found in Lake Apopka. The only exception to that comment is that water flowing from Wolfshead Lake, which is south of the proposed 122 acres, is a high quality of water, and through the project as contemplated, this water would be directly introduced into Lake Apopka through a flow over a natural wetlands system. This is in opposition to the present situation where the water from Wolfshead Lake flows primarily to the north through an existing canal and is mixed with water from the muck farm and is, therefore, of the eutrophic character as opposed to the high quality character. The Duda permit, which was issued, would allow the introduction of water which is similar in character to the water of Lake Apopka, through the system of ditch conveyances, placement in the retention pond, and at times, flow to the lake. In its effect, the nutrient loading which occurs by introduction of waters from that new farm, would be similar to that proposed in the CIF project. The fact of this similarity does not prohibit the district from evaluating water quality matters on the occasion of the CIF permit decision. Should the 122 acres be converted from natural vegetation to a muck farm, wildlife and fish habitat would be adversely impacted. The habitat provided by the plot is in scarce supply and is essential to the maintenance of a diversified fish population. The hardwood swamp, which is part of and adjacent to the 122 acres of the CIF application, supports benthic invertebrates, which are a food source for game fish. The type of vegetation found in the lake, due to its eutrophic state, is plankton and one of the by- products of the reproduction of that plant through the process and respiration is the destruction of the fish population. This occurs in the summer months. The plankton has replaced the emergent and submergent vegetation which once covered as much as two-thirds of Lake Apopka and now represents .05 percent of the lake. As a consequence, game fish have diminished over a period of years with plankton feeding fish predominating. Consequently, the fish population is less diverse and the removal of the vegetation becomes a significant contributor to the imbalance in fish population.

Florida Laws (5) 120.57373.016373.079373.413373.416 Florida Administrative Code (1) 40C-4.301
# 6
STRAZZULLA BROTHERS, INC. vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 82-001639 (1982)
Division of Administrative Hearings, Florida Number: 82-001639 Latest Update: Jun. 21, 1991

Findings Of Fact The property has been annexed into the Acme Improvement District (Intervenor) by Special Act of the Florida Legislature. Petitioner purchased 487.7 acres of this tract from private owners in 1954. Subsequently, Petitioner purchased 653.59 acres from the Trustees of the Internal Improvement Fund of the State of Florida on or about March 4, 1960. The balance of the land constituting the property is a 224 acre hiatus tract owned by Marshall Brown with whom Petitioner has an agricultural use agreement. A parcel of Petitioner's land within the property includes a commercial lease to Malrite Corporation for siting a television antenna, consisting of 111 acres in the southeast corner of the property. This area is within the permit application. The tract is otherwise undeveloped and is currently submerged or semi- submerged during much of the year. Petitioner's development plan envisions drainage of this tract and use of the property for cultivation. The property is bounded on the north by Acme Improvement District, on the east by a subdivision called Homeland, on the west by Water Conservation Area #1, also known as the Loxahatchee Refuge, and on the south by undeveloped lands. The boundaries of the Loxahatchee Refuge actually encroach by approximately 300 feet into the property. The property development plan, which is the basis of this application, was prepared by the engineering firm Gee and Jensen. This plan calls for the creation of a 240 acre reservoir of a proposed 3 foot maximum depth. This reservoir would hold the internal stormwater runoff for subsequent agricultural irrigation. Perimeter dikes are to be constructed to prevent surface water runoff from outside areas entering the project and perimeter ditches are to be developed for the deliverance of stormwater runoff from the internal agricultural system to proposed pump stations located at the southwest corner of the development area. On the northwest corner of the proposed reservoir, the existing Acme Improvement District pump station No. 2 would be increased in capacity by 27,000 gallons per minute. Under Acme's charter and its statutory annexation of the property, the proposed reservoir and water management works would become a unit of development controlled by Acme. Under Petitioner's agreement with the hiatus tract owner, Acme would be the exclusive manager and operator of the proposed system, and the property would become an integral part of Acme's water management system. The Acme Water Improvement District is not solely an agricultural support enterprise but serves the various uses which may evolve within its boundaries. The area is currently zoned for limited residential development as well as agricultural. The television antenna facility located on the property is an example of a non-agricultural use. Petitioner's surface water management system is proposed to discharge into the Acme system, which in turn discharges offsite. Discharge into the Acme system is of a limited nature, but the system is designed to discharge for successive days under wet conditions. The design discharge is not limited to an extreme rainfall event but would probably occur during the traditional hydrologic cycle of south Florida. Under conditions which reflect actual rainfall over the past 20 years, the proposed surface water management system would have discharged 19 out of 20 years into the Water Conservation Area (Loxahatchee Refuge). In some years this discharge would have continued for approximately three months. The unrebutted testimony of expert witnesses called by Respondent established that the entire 1,393 acre tract referred to herein as "the property" is a freshwater wetland habitat. The western half is emergent marsh land, while the eastern half is forested with woody species. The wetlands on the property form a valuable wildlife habitat. Environmentally, they are in excellent condition. This area has not been adversely affected by drainage, fire or exotic species. These marshes also have good habitat diversity. The populations of aquatic invertebrates and forage fishes that are produced in these Everglades marshes are utilized by the many species of wading birds that feed in these wetlands. The proposed project will adversely affect wildlife species, including a variety of wading birds which will likely be unable to relocate. While this is undesirable from an environmental standpoint, conversion of this land would provide benefits from an agricultural standpoint, and would create additional water recreational facilities.

Recommendation From the foregoing, it is RECOMMENDED: That Respondent enter a final order denying the application. DONE and ORDERED this 30th day of November, 1983, in Tallahassee, Florida. R. T. CARPENTER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of November, 1983.

Florida Laws (6) 120.60373.044373.116373.403373.406373.413 Florida Administrative Code (3) 40E-1.60340E-4.09140E-4.301
# 7
JAMES W. SLUSHER, JR. vs MARTIN COUNTY AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 00-003853 (2000)
Division of Administrative Hearings, Florida Filed:Stuart, Florida Sep. 15, 2000 Number: 00-003853 Latest Update: Dec. 18, 2003

The Issue The issues presented for decision in this case are: whether Martin County should be granted the re-issuance of Water Use Permit No. 43-00752W for the Tropical Farms Water Treatment Plant and associated wells; and (2) whether Martin County should be granted Water Well Construction Permit No. SF032696B for the construction of Well No. 10 of the Tropical Farms Water Treatment Plant, pursuant to the permitting criteria of Chapter 373, Parts II and III, Florida Statutes; Chapters 40E-2 and 40E-3, Florida Administrative Code; and the Basis for Review for Water Use Permit Applications of the South Florida Water Management District.

Findings Of Fact Petitioner James W. Slusher, Jr., and his wife, Diane L. Slusher, own a residential lot located in unincorporated Martin County at 2376 SW Ranch Trail, Stuart, Florida 34997. On the lot is a single family home. The size of the residential lot is approximately 2.25 acres. Mr. and Mrs. Slusher purchased the subject residential lot and home in September of 1994 from Mrs. Stella Kassinger. Mrs. Kassinger and her late husband (the “original owners”) had the home built on the residential lot in approximately 1980. When the original owners built the home, they had a hole or “pit” dug in the rear portion of the lot. From aerial photographs taken at the time (1979-1980), and based upon the common practice in the area, it appears that the material from the “pit” was spread on-site to provide additional elevation for, and to minimize the potential for flooding of, the home and driveway that were constructed on the lot. Thus, the original “design function” of the “pit” was to provide fill for construction. The original owners thereafter allowed the “pit” to accumulate water and stocked it with fish so that Mr. Kassinger could use it recreationally as a fishing pond. The “design function” of the original “pit” was thus changed so that it would serve as a recreational amenity on the property. During the subsequent 14 years that the original owners lived in the home, they did nothing further to alter or improve the fishing pond. Over the years, the area immediately around the fishing pond became heavily vegetated and was used from time to time by various wild birds and animals. The fishing pond was used by the original owners for fishing and for observing the wildlife it attracted. After purchasing the home, Mr. Slusher also stocked the fishing pond with various fish over the years so that he and his family could continue to use it recreationally. The fishing pond continued to be used by the Slushers for fishing, for observing wildlife, and as a swimming area for their dogs. Currently, the overall dimensions of the fishing pond are approximately 90 feet wide, by 122 feet long, by 10 feet deep at its deepest part, when filled to the level that was natural prior to the operation of Water Well No. 10. Potable water for the Slusher home is obtained from a well drilled on the property, not from the public water system of the County. The Slusher well is located approximately 33 feet from the home. It is attached by PVC pipe to a pump located next to the home. The original owners caused the well to be drilled. The record in this case does not contain any persuasive evidence regarding the details of the Slusher residential water well. Specifically absent are such details as the depth to which the well was originally drilled, the material from which the well tube was made (i.e., cast iron or PVC), and the current physical condition of the sub-surface portions of the well. Mr. Slusher has not done anything to repair or replace the well since he and his wife purchased the home. On August 2, 2000, Mr. Slusher filed a petition with the SFWMD challenging the issuance of Water Well Construction Permit No. SF032696B, and the "use of the well." On November 3, 2000, Mr. Slusher filed an amended petition with the Division of Administrative Hearings, challenging the issuance of Water Use Permit No. 43-00752W and Water Well Construction Permit No. SF032696B. Martin County (“the County”) is a political subdivision of the State of Florida, established in 1925 pursuant to Section 7.43, Florida Statutes, and Section 1, Chapter 10180, Laws of Florida. SFWMD is an independent state agency, operating pursuant to Chapter 373, Florida Statutes. SFWMD originally issued Water Use Permit No. 43-00752W to the County on April 15, 1993. The “water use permit” was for wells and associated equipment at the Tropical Farms Water Treatment Plant (“Tropical Farms WTP”). SFWMD re-issued Water Use Permit No. 43-00752W to the County on March 14, 1996. The re-issued “water use permit” allowed additional wells to be drilled and additional draws of water by the County at the Tropical Farms WTP. One of the additional wells included in the re-issued water use permit was “Well No. 10.” SFWMD issued Water Well Construction Permit No. SF032696B to the County on March 28, 1996, allowing the construction of Well No. 10 at the Tropical Farms WTP. In accordance with the restrictions imposed by the water well construction permit, the County drilled Well No. 10 on a site located at least 100 feet in distance from the fishing pond on the Slushers’ property. The physical location of Well No. 10 is essentially “adjacent to” the Slusher property. County Well No. 10 is approximately 120 feet deep and draws water from the surficial aquifer. It commenced operation in December of 1996. It is uncontested that the operation of the well field, especially County Well No. 10, has caused drawdowns of the pond level and of the groundwater in the area of Mr. Slusher's residential water well. The MODFLOW model used by the County in support of its application indicates a maximum drawdown of 7.4 feet. The persuasive expert opinion evidence in this case indicates that maximum draw downs of 7 or 8 feet would be expected in the area of Mr. Slusher's residential water well. The County has acknowledged that the operation of Well No. 10 has had a significant effect on the drawdown of the water table in the area of the pond. County Well No. 10 appears to have been constructed in a manner consistent with the applicable rules. The well was properly drilled and grouted, the correct materials were used, and the well was constructed in a manner that did not result in harm to the water resources. The water use permit was issued prior to the well construction permit, as is appropriate. Although permitted originally in 1993 and again in 1996, the Tropical Farms WTP did not begin regular operations until June of 1997. It is now part of a consolidated system which includes four other water treatment plants, all operated by the County for the purpose of obtaining and providing potable water to the public county-wide. In support of its applications for the issuance and re-issuance of the water use permit, the County provided SFWMD with so-called “MODFLOW calculations” done by a professional engineering firm retained by the County. MODFLOW was developed by the U.S. Geologic Survey and is considered the standard for assessment of ground water resource impacts. The results of the three-dimensional MODFLOW modeling showed that the drawdown effect on the water table of the proposed wells for the Tropical Farms WTP would be unlikely to cause any adverse effect on typical wells used by homeowners, even if the latter were located within the same small “square” as one of the County’s wells. Prior to the commencement of the operation of Well No. 10 by the County, the water level in the fishing pond on the Slusher property would vary only a few inches up or down during the course of a typical year. After the County began to operate County Well No. 10, Mr. Slusher observed and videotaped much greater variations in the water level in the fishing pond on his property. After County Well No. 10 began to operate, the pond water level dropped to the extent that it would become virtually empty of water from time to time. At other times, however, the fishing pond would refill with water, such as in September of 1999, and in August of 2001. When the water in Mr. Slusher's pond gets very low, it has an adverse impact on the fish in the pond; the fish die because they have insufficient water. Mr. Slusher has not done anything over the years since the operation of County Well No. 10 began to attempt to prevent the variations in the water level of the fishing pond, or to mitigate the occurrence of such variations. The County (together with the rest of southern Florida) has experienced several periods of severe drought over the past few years. Yet other “ponds” on other properties in the same neighborhood as the Slusher property have not experienced the significant variance in water level that has occurred in the fishing pond on the Slusher property since the County began drawing water from Well No. 10. The County does not operate Well No. 10 continuously. Rather, it has attempted to reduce its use of the well. SFWMD has never issued any notice to the County that any mitigation was required on the Slusher property pursuant to the limiting conditions of the water use permit. The County does not dispute that its operation of Well No. 10 has contributed to a drawdown in the level of the water table in the surrounding area, nor that such a drawdown has contributed to the variance in the water level in the pond on the Slusher property. Indeed, the drawdown of the water table generally was fully anticipated and predicted in the materials submitted by the County to SFWMD. The use of County Well No. 10 to draw water from the surficial aquifer is not the only factor contributing to the variances in the water level of the fishing pond on the Slusher property. Evaporation and natural variances in the level of the water table also contribute to changes in the water level of the fishing pond. Bentonite is a naturally occurring clay that is mined for a variety of uses, including the “lining” or “waterproofing” of reservoirs, lagoons, ponds, ditches, and other man-made bodies of water in order to seal them and to prevent or minimize seepage or percolation of the water into the ground. Even repeated wetting and drying of the clay does not reduce its effectiveness. Bentonite is widely used and has not been found to have any harmful or toxic effects on either human beings or wildlife. In some applications, bentonite clay is a superior lining material when compared to a man-made liner, such as a plastic or polymer sheet. In a small scale application where the volume of water in a lined pond is relatively low, a man- made liner could be forced away (“balloon up”) from the bottom of the pond by the pressure of a rising natural water table. Lining the pond on the Slusher property with Bentonite (or some similar clay) would create a virtually impervious layer that would separate the water in the pond on the Slusher property from the surrounding water table. With such a lining in place, County Well No. 10 would have no significant effect on the water level of the pond. The water level in the pond on the Slusher property could also be stabilized at or near its normal level prior to the operation of County Well No. 10 by installation of a water supply that would add water to the pond whenever the pond dropped below a specified level. Mr. Slusher first complained to the County about the effect of the County’s operation of Well No. 10 in 1997, when he spoke with Jim Mercurio, a County water utilities employee. Mr. Slusher also complained at about the same time to SFWMD, which resulted in a “field investigation” in September 1997. At that time, Mr. Slusher complained about the lowering of the water level in the pond on his property, but specifically denied any adverse effect on the water from his residential water well. Mr. Slusher began to complain about the water quality and water pressure in his residential water well sometime in 2000. The water flowing from Mr. Slusher's residential water well now has an unpleasant odor, taste, and color, and the water causes rust stains. The water pressure of the water flowing from Mr. Slusher's residential water well is less than it was before the construction of County Well No. 10. The rust stains, odor, taste, and color are all due to iron oxidation of the water drawn from the well on the Slusher property. The County regularly experiences similar problems with iron oxidation in the water that it draws from its own wells in the same area as the Slusher property, which the County must treat at the Tropical Farms WTP. The problem of iron oxidation (and accompanying odor and taste deficiencies) in the water is thus not unique to the water drawn from the well on the Slusher property. Iron oxidation in well water is not harmful to human beings. The evidence in this case does not include any evidence of any testing of the water quality of the water coming from the Slusher residential well. Similarly, there is no persuasive evidence as to the current condition of the sub- surface portions of the Slusher residential well. Further, the evidence regarding the cause of any deterioration of the water quality and/or the water pressure of the Slusher residential water well is both anecdotal and speculative, and is not a persuasive basis for determining the cause of any deterioration of the water quality and/or water pressure of the subject residential well. Specifically, the evidence is insufficient to establish that the water quality and water pressure deterioration complained of by Mr. Slusher are a result of the operation of County Well No. 10. Such deterioration could be caused by other circumstances or conditions, including the uninspected sub-surface condition of Slusher's residential water well. The water quality and water pressure problems currently experienced by Mr. Slusher could be minimized or eliminated by connecting his residence to the residential water supply system operated by the County. A branch of the County's public water system already exists in Mr. Slusher's neighborhood within a few hundred feet of his property. The application and information provided to SFWMD by the County were determined by SFWMD to provide “reasonable assurances” that existing legal users would not be adversely affected by the proposed wells or water treatment facility.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby recommended that the Governing Board of the South Florida Water Management District enter a final order issuing Water Well Construction Permit No. SF032696B and re- issuing Water Use Permit No. 43-00752W to Martin County, subject to the general and special conditions set forth therein. DONE AND ENTERED this 31st day of May, 2002, in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 31st day of May, 2002. COPIES FURNISHED: Howard K. Heims, Esquire Virginia P. Sherlock, Esquire Littman, Sherlock & Heims, P.A. 618 East Ocean Boulevard, Suite 5 Post Office Box 1197 Stuart, Florida 34995-1197 Douglas H. MacLaughlin, Esquire South Florida Water Management District 3301 Gun Club Road Post Office Box 24680 West Palm Beach, Florida 33416-4680 David A. Acton, Esquire Senior Assistant County Attorney Martin County Administrative Center 2401 Southeast Monterey Road Stuart, Florida 34996-3397 Frank R. Finch, Executive Director South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416-4680

Florida Laws (3) 120.569120.577.43
# 8
DR. GEORGES BLAHA, ET AL. vs. AQUARINA DEVELOPMENTS, INC., 81-002259 (1981)
Division of Administrative Hearings, Florida Number: 81-002259 Latest Update: Sep. 09, 1982

Findings Of Fact By application No. 2-7738 filed on June 29, 1981, Aquarina has requested a withdrawal for consumptive use of ground water in Brevard County in the amount of 468,000 gallons per day (850,000 gallons per day maximum) of raw water (before processing). The purpose of the proposed consumptive water use is a proposed development of 196+- acres in Brevard County located between Mullet Creek, a tributary of the Indian River and the Atlantic Ocean in South Brevard County. It is located on the barrier islands separated from the mainland by the Indian River, and is 13 miles south of Melbourne and 5 miles north of Indian River County. Aquarina proposes to develop a condominium community with a projected population of 3,500 persons consisting of 1,600 residences, a commercial area, and 500 hotel rooms. An on-site well field is proposed as well as reverse osmosis water treatment and wastewater treatment plants which are to be constructed near the southern boundary of the development. Two wells with a capacity of approximately 500 gallons per minute are proposed to be constructed and both will withdraw water from the Floridian Aquifer for conversion by reverse osmosis treatment into potable water. 3/ In addition to potable water supply requirements for the development, although part of the requirement will be met by wastewater, there is a requirement for irrigation water for landscaping. The Aquarina site has been zoned Planned Unit Development (PUD) since 1973 and the proposed densities are in accordance with those established in the Brevard County Comprehensive Plan and Zoning Ordinance. As a result of an earlier application of Aquarina for consumptive use, a temporary water use permit was granted by the District to allow Aquarina to drill test wells for aquifer testing before the present application for water use would be considered by the District. This earlier application is not now at issue. Pursuant to this temporary permit, Aquarina conducted an aquifer test program. During the first test, well #1 (the northernmost well) was utilized as a monitor or observation well for the test conducted on well #2, and an existing mosquito control well was also used as an observation well. A two-step pump test was run for 24 hours, with drawdown readings recorded at all three wells. The pump test analysis showed that the Floridian Aquifer transmissivity (the measure of the ability of the aquifer to transmit water) ranged from 173,000 gallons per day per foot at the observation wells to 87,000 gallons per day per foot at the discharge well. The total depth of these two wells was #1 -- 425 feet and #2 -- 412 feet. Following submission of the results of the first aquifer test and the application for consumptive use filed on June 29, 1981, the District staff prepared a Technical Staff Report (TSR) for the benefit of the District Governing Board based upon the two wells drilled pursuant to the temporary permit. However, because the proposed withdrawals would be from the Sebastian Inlet fresh water lens which is a finite potable source of water rapidly being depleted by existing domestic uses and mosquito control wells, the TSR recommended, among other things, that the two wells be deepened to a depth below the Sebastian Inlet fresh water lens and cased to the depth of 450 feet to insure that withdrawals occur from expected saltier water below the lens. Also, the District staff recommended that three mosquito control wells on the Aquarina property be properly plugged to eliminate fresh water loss from the lens due to the following wells. The three flowing mosquito control wells on the site were estimated to have been flowing at 432,000 gallons per day. The Sebastian Inlet fresh water lens from which Aquarina initially intended to withdraw its water appears as two underground bubbles or lenses of water fresher than the surrounding connate or saltier water. The lenses apparently are a result of stratigraphic entrapment of fresh water due to geological formations and are not being recharged with fresh water. When withdrawals are made from these lenses, salty or connate-water fills the void left by the fresher water following withdrawal. The two lenses were substantially larger during recent times but, because of many domestic uses as well as mosquito control wells which have been flowing freely, the reservoirs have shrunk significantly. Based upon present usage, the north portion of the lens will last until approximately the year 2000 at current rates of consumption and the south portion of the lens will last until approximately the year 2030 at current rates of consumption. Because of the impact on the Sebastian Inlet lens, the staff of the District could not recommend approval of Aquarina's application unless Aquarina agreed to three main conditions: The Applicant would case its production wells to 450 feet below the surface, to avoid interference with the freshwater reservoir. (Because of the combined factors of upward artesian pressure in the aquifer, the greater density of salt or connate water in relation to fresh- water, and the known range of transmis- sivity and storage factors for that portion of the aquifer [an underground waterbearing stratum or group of strata] in that geographical area, connate water would flow upward and from the sides into the area of the Applicant's withdrawal of water from beneath the lens, and the lighter, fresh water of the lens above would remain there, free from interfer- ence by the withdrawal.) The Applicant would have to plug all the preexisting mosquito control wells on the development site. The Applicant would have to undergo early monitoring of the chemical quality of this water and the water within the fresh water reservoir. As a result of Aquarina's agreement to meet these three conditions, the Technical Staff Report (TSR) issued by the District on August 20, 1981, recommended approval of the application with the addition of the above conditions. During the course of (1) deepening of well #2 to a depth of 650 feet and backplugging to 595 feet; (2) casing it to a depth of 450 feet; (3) performing a second aquifer test on the deeper well; and (4) evaluating the proposed withdrawals, Aquarina's consultants came to the following conclusions which were unrebutted by other evidence submitted at the final hearing: During the process of deepening well #2 to 650 feet, later backplugged to 595 feet, the consultants discovered an aquitard or confining layer made up of small clay-sized particles which retard the vertical flow of water at a depth of 440 to 450 feet. This well was cased to a depth of 450 feet or to the top of the aquitard. Before reaching this layer, the quality of water was generally declining with increasing depths. Below this layer, the quality of water improved to a depth of approximately 550 feet and the transmissivity was greater below the aquitard than above. Further, that same aquitard was also discovered in a mosquito control well on site when it was logged. Sufficient quantities of treatable water are available from the deepened well to supply the needs of the Aquarina project. That in both the June, 1991, and the subsequent aquifer test, there appeared to be interferences from other sources which impact the potentiometric pressure levels of the wells on the Aquarina site. These were identified as the South Brevard Utilities Corporation (SBUC) and nearby domestic well users. That the results of the June, 1981, test and computer modeling were that the impact of the proposed Aquarina with- drawls on existing nearby wells drilled to the shallower level was between a one to two foot decline in the potentiometric pressure. The average potentiometric pressure in the local aquifer is 27 feet above National Vertical Geodetic Datum (NVGD) or Mean Sea Level (MSL). These existing nearby wells were identified to be the SBUC well approximately 2,400 feet away from Aquarina and those wells of nearby homeowners in the same vicinity as the SBUC well. That flownet analysis (EPA computer model) of the results of the second aquifer test program revealed that approximately 6% of the water obtained from the deepened well would come from the layers above the aquitard, i.e. connate water and the Sebastian Inlet fresh water lens. Based on this model, the effect on water quality for existing users of the proposed withdrawals was concluded to be insignificant and known existing users would not be harmed by the proposed withdrawals. The aquitard was observed in the Aquarina deepened well and the observation mosquito control well which was logged. It was impossible to state definitely that the observed aquitard in the area was a continuous geologic feature. Partly due to the proximity of the aquitard and the depth of the wells in relation to the Sebastian Inlet fresh water lens, the conclusion was reached that effect on water quality of the Aquarina withdrawals would be insignificant. There is no fresh water recharge into the Sebastian Inlet fresh water lens, but there is a continuous pressure con- nection throughout the Florida aquifer in the area. Any replacement of water discharged from the Sebastian Inlet fresh water lens or the lower zones will be of saltier, less potable connate water. It is not understood how long the part of the aquifer below the aquitard (lower zone) will continue to be a significant source of fresh water due to insufficient data. The three mosquito control wells on the Aquarina site are flowing when uncapped or unplugged an estimated 432,000 gallons per day while the wells in the northern sector of the Sebastian Inlet fresh water lens (below where Aquarina is located) flowed at an approximate rate of 2.6 MGD. These withdrawals by the mosquito control wells are primarily from the Sebastian Inlet fresh water lens and are the major cause of premature depletion of the lens. The testimony and the data presented at the hearing demonstrated that the Applicant has met its burden to show by a preponderance of the evidence that the proposed withdrawals by Aquarina will not significantly affect either the quality or quantity of water available to neighboring water users. This appears to be the case regardless of whether the aquitard testified to be about ten feet thick exists and whether the leakance value of less that 6% exists in the aquifer between the point of the Aquarina withdrawals and neighboring users. Data which may be generated subsequently may lead to a different conclusion, but this finding is based on the data presented to the Hearing Officer by the parties at the hearing. 4/ Aquarina has agreed to the following permit condition: (b) The applicant would have to plug all the preexisting mosquito control wells on the development site. The proper plugging of the mosquito control wells on the Aquarina site will save approximately 432.000 GPD of water from the finite Sebastian Inlet lens. This condition was agreed to independently of the contribution by Aquarina of $25,000 to the well plugging program with the District and Brevard County which has as its goal, the plugging of all mosquito control wells in the area. Without the plugging of the mosquito control wells, it is estimated that the northern reservoir of the lens would be depleted by the year 2000, and the southern reservoir by the year 2030. It was also estimated that the plugging of the mosquito control wells would prolong the life of the fresh water reservoirs by over 100 years. Furthermore, by plugging all the mosquito control wells, approximately 6,700,000 gallons per day will be saved from the entire lens area. The basin in which Aquarina is located is in an overdraft condition with more water withdrawn than is presently being recharged. However, the Aquarina project will bring about a net improvement in the situation due to the mosquito control well plugging program imposed as a condition of the permit. Under the sites current PUD zoning, a density of 12 dwelling units per acre is permitted. The current classification of the property in the Brevard County Comprehensive Plan is "urbanizing." Under that classification, the Applicant could seek a rezoning of the property from PUD to single family attached residential. Such a reclassification would avoid the requirements of Chapter 373, Florida Statutes, by allowing each of the 196+- dwelling units to have its own well with a per unit consumptive use below the quantity required to activate Chapter 373, Florida Statutes. Nothing would prevent any of the residential wells from tapping the fresh water lens presently used by the Petitioners in a total amount exceeding that sought in the instant application. Given the designated land use of the Aquarina site, the controlled withdrawal from one or two points within the development is a preferable alternative to the unregulated development and water use which in all probability would follow from the denial of this permit. In large measure, the District's options regarding this site and its attendant consequences have been predetermined by land use decisions made by local officials. Under these circumstances, the District has been required to choose among a set of options which do not include an option for controlled and limited growth directly tied to availability of fresh water resources envisioned by the Petitioner. The choice which the District made in this case, although obviously not ideal, is the best among the presently available alternatives.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Respondent St. Johns River Water Management District grant the requested consumptive water use permit to the Applicant Aquarina Developments, Inc., subject to the conditions contained in the staff's TSR, as corrected and amended on March 25, 1982, which include, but are not limited to: The maximum daily withdrawal shall not exceed 9.765 million gallons per day for five years. The maximum annual withdrawal shall not exceed 171 million gallons for five years. The existing ten inch public supply wells shall be lined or cased to a depth of 450 feet below land surface to insure with- drawals from below this depth. The construction standards used to perform these well modifications shall be accomplished through all appropriate permitting regulations and conform to existing construc- tion standards as stated in Chapter 373, Florida Statutes (F.S.) and Chapter 40C-3, Florida Administrative Code (F.A.C.). That any subsequent Public Supply well or wells constructed for this project be cased to an equal depth. That all mosquito control wells (3) within the property boundaries of the permittee be plugged with neat cement grout from bottom to top as specified in Chapter 40C-3, F.A.C. Chloride concentrations and dissolved solids in water samples from each water supply well shall be measured monthly, and results shall be submitted within 60 days of measure- ment to the St. Johns River Water Management District. A complete water quality analysis including Ca, Mg, Na, K, Cl, S04, HC03, pH and Co3 shall be performed on samples collected in May of each year. The permittee shall maintain withdrawal records showing daily withdrawals of raw (pre-treatment) water for each year ending May 31. These records shall be submitted on a quarterly basis on District Form En-3. Nothing in this permit shall be construed to limit the authority of the St. Johns River Water management District to declare a water shortage and issue orders pursuant to Section 373.175, Florida Statutes, or formulate a plan for implementation during periods of water shortage pursuant to Section 373.246, Florida Statutes. District representatives may visit the site to insure compliance with conditions of this permit following advance notifica- tion of the permittee of the time of visit. The water conserving techniques and methods as outlined in the July 30, 1981 letter to the District from Ed Fleis, P.E., to Thomas K. Ziegler, TSR Exhibit 10, shall be implemented and included throughout all phases of this project. Further, should the replace- ment of any fixtures or appliances be required during the life of this permit, water conserving fixtures equivalent to those originally specified shall be installed. DONE AND ORDERED this 6th day of August, 1982, in Tallahassee, Florida. SHARYN L. SMITH Hearing Officer Division of Administrative Hearings Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of August, 1982.

Florida Laws (5) 120.57373.019373.175373.223373.246
# 9
WILLIAM H. AND PATRICIA H. MELLOR, ET AL. vs. COUNTY LINE DRAINAGE DISTRICT AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 83-000082 (1983)
Division of Administrative Hearings, Florida Number: 83-000082 Latest Update: Jun. 21, 1991

Findings Of Fact The CLDD was established pursuant to Chapter 298, Florida Statutes, on August 4, 1967. Its purpose was to "reclaim" or render the land within its boundaries usable for agricultural purposes. The land comprising the CLDD consists of approximately 3,500 acres in Lee County, mostly planted in citrus trees. Pursuant to the requirements of Chapter 298, Florida Statutes, a "Plan of Reclamation" was prepared by consulting engineers for the CLDD's Board of Supervisors in August, 1967. That plan contains provisions for reclaiming lands within the CLDD's boundaries and for managing and controlling surface water within CLDD. The method of water control outlined in the 1967 reclamation plan included a dike and ditch system around the boundaries of CLDD with a series of interior canals to carry excess water away from the citrus trees. The land in the north part of he CLDD is higher than the south and water generally, naturally flows from north to south. The interior canals were designed to carry water in accordance with existing contours of the land and eventually discharge excess surface water to the rim ditches on the north and east sides of Spoil Area "M," which is south of the CLDD and which was then owned by the C&SFFCD, the predecessor agency to SFWMD. The system of drainage delineated in that 1967 plan, inaugurated pursuant to Chapter 298, Florida Statutes, was put into effect substantially as described therein. CLDD's 1967 plan was altered somewhat because of an agreement entered into on September 30, 1971, between the CLDD and neighboring landowner Kenneth Daniels. Pursuant to that agreement, the two parties agreed to extend the dike on the west side of the CLDD property and construct a ditch from a point 50 feet north of the northwest corner of the Petitioner Mellor's property, which new ditch was to run southwest across the Daniels' property and connect with Spanish Creek. That ditch or canal would thus connect the western rim ditch of the SFWMD's Spoil Area "M" with Spanish Creek and have the result that surface waters could be discharged from CLDD lands through the western rim ditch of Spoil Area "M" thence through the "Daniels' Ditch" finally discharging into the lower reaches of Spanish Creek. (see Exhibits 1 and 11) Because the western side or western rim canal of the SFWMD's Spoil Area "M" had not been used under the original plan of reclamation approved by the C&SFFCD, CLDD sought permission from C&SFFCD to use this western rim canal for the purpose stated pursuant to the agreement with Daniels. Thus, CLDD's proposed use of the rim canal of Spoil Area "M" would be confined to the western, northern and eastern perimeter canals and not the southern boundary canal. All affected landowners, Kenneth Daniels as well a Jake and Lilly Lee, agreed to those proposed installations and uses. The resulting agreement between CLDD and C&SFFCD was entered into on October 12, 1972, and describes the flood control District land to be used by CLDD as a 100 foot wide strip running along the west, north and east sides of Spoil Area "M," also know as "Aspic." This 100 foot wide strip of land running thusly is co-extensive with the rim ditch of Spoil Area "M." The CLDD was mandated by this agreement to install 72- inch pipes in the rim ditch at the southwest corner of the spoil area, just north of the Mellor property, giving a point of discharge from the western rim ditch into the Daniels' Ditch with similar pipes connecting that Daniels' Ditch with Spanish Creek, such that the canal between these two points could carry water from the west rim ditch to Spanish Creek. The easement incorporated in this agreement was to last for five years with an option for a five-year renewal, which option was exercised. At the end of this 10-year period, SFWMD, successor to C&SFFCD, notified CLDD that because its statutory authority had since changed, the easement could not be renewed and that CLDD would have to seek the subject permit so as to be authorized to use works and lands of the District. The requirements to be met by an applicant for a right-of-way permit such as this one are set out in Rule 40E-6.301, Florida Administrative Code, and SFWMD's permitting information manual, Vol. V, Criteria Manual for Use of Works of the District, July, 1981, which is incorporated by reference in that rule. In that connection, the permit at issue, if granted, would not cause an interference with the "works" of the District, that is dikes, ditches, flood control structures arid drainage structures because it would merely renew the pre-existing authorized use. The permit will not be inconsistent with an comprehensive water use plan developed by the District. Further, the permit applicant owns or leases the land adjacent to the portion of the "works of the District" involved herein that is the east, north and west rim ditches of Spoil Area "M," the Daniels' Ditch and the pipes at either end of it coupled with the water control structures at the southeast corner and southwest corners of Spoil Area "M," which control water entering the south rim ditch. CLDD has a surface water management permit, issued in August, 1980, which is a prerequisite to the granting of the subject right-of-way permit. It remains in full force and effect. That surface water management permit authorizes "operation of a water management system serving 3,642 acres of agricultural lands by a network of canals and control structures, with a perimeter dike and canal discharging into Cypress Creek." The "surface permit" authorized the system of drainage and discharge in existence at the time of its issuance, May 8, 1980. The system of drainage, at the day of the hearing, consisted of the same basic water flow and discharge pattern that existed for approximately 10 years, and this permit would allow that to be continued, thus, there will not be any additional effect on environmentally sensitive lands occasioned by an issuance of the subject right-of-way permit. The surface water management permit, by its terms, refers initially to the operation of a water management system" . . . discharging into Cypress Creek." The reference to "Cypress Creek" was an administrative error. The express language on the face of the permit authorization incorporates by reference the application, including all plans and specifications attached thereto, as addressed by the staff report, and those materials, including the staff report, are a part of the permit. The complete permit, including all those documents incorporated by reference, makes it clear that the authorization of the surface water management permit was that the system of drainage in existence at the time of permit issuance (1980) was that which was being approved, and that included discharge to Spanish Creek and not Cypress Creek. Discharge of water to Cypress Creek as an alternative was never recommended or authorized by that surface water management permit. This is clearly the intent expressed in the permit in view of the language contained in a special condition of that surface water management permit imposed by the SFWMD as a condition for issuance which stated as follows: Within 45 days of the issuance of this permit the permittee shall submit for staff approval a proposal and schedule for the elimination of the adverse impacts being created by the operation of the permittee's water management system, which can be legally and physically accomplished by the permittee. Adverse impacts are considered herein to be reduced flows to Spanish Creek and increased flows to Cypress Creek. Thus, it is obvious that the authorization of the surface water management permit was designed to provide for discharge into Spanish Creek and to enhance the flows to Spanish Creek pursuant to a required proposal which the permittee submitted to SFWMD. Thus, the right-of-way permit applied for herein is consistent with the valid surface water management permit held by the permit applicant in this proceeding. Petitioners William H. and Patricia H. Mellor are co-owners of parcels of property lying some distance south of Spoil Area "4" in the vicinity of the Caloosahatchee River. This property does not abut the spoil area at any point. Spanish Creek does cross their property several thousand feet south of the south boundary of the spoil area. In the past, particularly in 1982, water flowing from the south rim ditch of the spoil area through a break in the dike of that south rim ditch, has flowed through a ditch known as Dry Creek in a generally southerly direction under S.R. 78 and has washed out an access road constructed by William Mellor which leads from Highway 78 to his property. He had this washout repaired at his own expense in 1982. The washout was caused by water from CLDD flowing into the south rim canal of Spoil Area "M," that is, the ditch that traverses (and defines) the southerly boundary of the spoil area. Mr. Mellor admitted, however, that SFWMD had at least partially plugged the opening in the south rim ditch which had allowed flow down the Dry Creek ditch and wash out his road. If closed water control structures are maintained at the southwest and southeast corners of the spoil area ditches, then no water could flow into the south rim canal and no such injury could again be caused. Petitioner's Jim English and Patricia Mellor are co-owners of a 45- acre parcel of land located in the southwest corner of Spoil Area "M." The five acres forming the extreme southwest corner of the spoil area do not belong to these Petitioners, but are owned by one Lynwood Brown, who is not a party to this proceeding. The English/Mellor property forms a part of the spoil area, but does not adjoin or constitute any part of the spoil area which is sought to be used by CLDD through the proposed right-of-way use permit (as clarified by CLDD's stipulation). The south rim ditch, either part of, or adjoined by their property, has been used for water storage in the past (they maintain illegally) 1/ Mr. Tom Pancoast has observed Spanish Creek frequently over a nine- year period starting in approximately 1973. He has often used those waters during that period for fishing. During the early years of his use and observation of Spanish Creek, the water flowed out of Spanish Creek into the Caloosahatchee River. Beginning in about 1976, the water appeared to be flowing in the opposite direction, from the river into Spanish Creek. Contemporaneous with this hydrologic change, the creek has become increasingly characterized by siltation and hyacinth growth. Mr. William Mellor owns property along the course of Spanish Creek. He has used the stream for recreational purposes, picnicking where the stream traverses his property. In recent years there has occurred a marked increase in the growth or profusion of aquatic plants of unidentified types in the creek, reduced clarity and reduced flows or volumes of water in the creek. Witness English has made a similar observation. Witness James English has a substantial degree of training by formal education and experience in water management and drainage practices and methods, particularly as they relate to citrus grove development and management in southwest Florida. Mr. English has observed Spanish Creek regularly for most of his life, including the region of its headwaters in the "Cow Prairie Cypress," a remnant wetland cypress strand lying within the CLDD immediately north of Soil Area "M." The chief adverse impact of the CLDD water management system is reduced flow to Spanish Creek, especially its upper reaches since the advent of the "Daniels' Ditch" as a drainage route and discharge point into lower Spanish Creek. However, the only special condition on the issuance of the surface water management permit approving CLDD's extant water management system was the requirement that CLDD should submit a plan for eliminating that adverse effect, which it did (as Petitioner English admits). Beyond the submission of such a plan, no concrete action designed to restore historic flows to Spanish Creek has yet begun, however. The restoration of historic flows, adequate in volume and quality, to the entire creek system would require discharging water from CLDD's system to the Cow Prairie Cypress area at the headwaters of the creek rather than substantially further downstream at the present Daniels' Ditch site. The Petitioners' complaints (aside from the issue of adequacy of flows in Spanish Creek), although meritorious, are, because of stipulations asserted by CLDD during the course of this proceeding, now rendered moot. CLDD stipulated that it only seeks a permit to use the west, north and eastern spoil area ditches. It does not seek and stipulated that it will not use, at any time, the south rim ditch and will maintain water control structures so to block water from entering that ditch. This will alleviate the problem of potential storage of water on Petitioners English and Patricia Mellor's property and the erosion problem on Petitioners William and Patricia Mellor's property south of the spoil area. It was thus established that the issuance of the right-of-way permit will not cause the injuries these Petitioners have suffered in the past because of use of the south rim ditch for water drainage and storage.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence in the record and the candor and demeanor of the witnesses, it is, therefore RECOMMENDED: That the South Florida Water Management District grant the County Line Drainage District's application for a permit for utilization of works and lands of the District. Subject to the following special condition: Issuance of this right-of-way permit does not relieve the Respondent CLDD from the responsibility of complying with special condition number 1 of the surface water management permit number 36-00184-S. Respondent CLDD shall, within 30 days of date of permitting, submit a design to the satisfaction of the SFWMD staff which will prevent the ability of CLDD to discharge to the southern rim ditch, described above. DONE and ENTERED this 29th day of September, 1983, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of September, 1983.

Florida Laws (2) 120.57373.085 Florida Administrative Code (1) 40E-6.011
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer