POSEIDON MINES, INC. vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-002092 (1975)
Division of Administrative Hearings, Florida Number: 75-002092 Latest Update: Mar. 21, 1977

The Issue Whether a consumptive use permit for the quantities of water requested in the application should be granted.

Findings Of Fact Application 7500137 seeks an average daily withdrawal of 2.4 million gallons of water with maximum daily withdrawal not more than 2.88 million gallons from an existing well in order to process phosphate and reclaim land. This is an existing use for mining operations located southwest of Lakeland, Florida, on land consisting of 1531 acres. Notice was published in a newspaper of general circulation, to wit: The Lakeland Ledger, on November 11 & 18, 1975, pursuant to Section 373.146, Florida Statutes. The application and affidavit of publication were admitted into evidence without objection as Composite Exhibit 1, together with correspondence from James R. Brown, Vice President, Dagus Engineers, Inc., dated November 19, 1975 to the Southwest Florida Water Management District. No objections were received by the Water Management District as to the application. Mr. George Szell, hydrologist of the Water Management District testified that the application met the conditions for a consumptive use permit as set forth in Chapter 16J-2.11, Florida Administrative Code, except that the quantity of water requested to be withdrawn is 41.06 per cent over the maximum average daily withdrawal permitted under the water crop theory as set forth in Section 16J-2.11(3), F.A.C. However, the Water Management District witness recommended waiver of that provision since the mining operations will be concluded in several years and thereafter the water table and hydrologic conditions will return to normal. The Water District staff recommended approval of the application with the condition that a meter be installed on the well and that the applicant be required to take monthly readings thereof and submit quarterly reports of the readings to the District. The applicant's representative agreed to these conditions at the hearing.

Recommendation It is recommended that Application No. 7500137 submitted by Poseidon Mines, Inc., for a consumptive water use permit be granted on the condition that a meter be installed on the applicant's well and that monthly readings be taken and submitted quarterly by the applicant to the Southwest Florida Water Management District. It is further recommended that the Board of Governors of the Southwest Florida Water Management District, pursuant to Rule 16J-2.11(5), for good cause, grant an exception to the provisions of Rule 16J-2.11(3), as being consistent with the public interest. DONE and ENTERED this 19th day of January, 1976, in Tallahassee, Florida. THOMAS C. OLDHAM Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: J.T. Ahern, Staff Attorney Southwest Florida Water Management District P.O. Box 457 Brooksville, Florida 33512 Poseidon Mines, Inc. P.O. Box 5172 Bartow, Florida

Florida Laws (1) 373.146
# 1
ROSE ANN DE VITO vs JOHN FALKNER, CHRISTOPHER FALKNER, AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 95-005763 (1995)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Nov. 27, 1995 Number: 95-005763 Latest Update: Jun. 03, 1996

The Issue The issue in this case is whether the application of Respondents Falkner to transfer and modify a Water Use Permit should be approved.

Findings Of Fact The Southwest Florida Water Management District (District) is responsible for regulation and protection of water resources in the geographic area involved in this proceeding. Since 1994, John Falkner has owned the property in Hillsborough County which is the subject of this proceeding. The Falkner property is farmed by Christopher Falkner, the owner's brother. Prior to purchasing the land, the Falkners farmed the property, also known as the Rogers farm, through a lease arrangement with the previous owner. Rose Ann DeVito owns property to the south of the Falkner property. In the time since Ms. DeVito purchased the property, the elevation of Sumner Road has been raised and culverts were replaced. A fish farm was constructed in close proximity to her property. The result of this and other development has been to direct all the water flow from the surrounding area into the stream adjacent to the DeVito property. Drainage patterns in the area of Ms. DeVito's property have been altered since she first occupied the property. A ditch along Sumner Road which used to handle runoff from her property has been blocked by a neighbor's driveway. Maintenance on the ditch, allegedly a county responsibility, is described as poor. The ditch at the rear of Ms. DeVito's property handled water flow to Bullfrog Creek until the water flow became blocked, and the water diverted onto her property. The effect is that Ms. DeVito's property often contains a large amount of water. A substantial amount of sand is visible on her property, allegedly deposited by water flow. According to Ms. DeVito, both the county and the District have blamed the Falkner farm for the water-deposited sand. Charles and Diana Booth own property adjacent and to the south of the Falkner property. From 1992 to 1994, the Booths suffered from water running off the Falkner/Rogers farm and flooding the Booth property. A flood of the Booth property in the Fall of 1994 was not caused by irrigation but was related to a ten inch rainfall event at the Falkner farm. A ten inch rainfall exceeds a 25 year storm event and would likely result in widespread flooding. The Booths' pasture, top soil and driveway were eroded by the flooding. During the two years of flooding, Mr. Booth complained on several occasions about the flooding to the Falkners' foreman, "Cleo." The complaints were not relayed to Mr. Falkner. In October 1994, Mr. Booth reported the problem to the Southwest Florida Water Management District. Soon after the complaint was made, a representative of the District inspected the property and determined that a ditch needed maintenance. Shortly thereafter, the ditch was cleaned and a berm was installed to redirect runoff away from the Booth property. There has been no further flooding of the Booth property. In October 1995, Mr. Booth became concerned that a ditch was filling with sand and would not continue to handle the runoff. After voicing his concern, a water diverter was installed in the ditch and appears to have remedied the situation. At the time the Falkners began to lease the Rogers property, an existing water use permit, numbered 206938.01, had been issued and was valid for the farm. The Falkners have applied to transfer the existing water use permit from the previous property owner. The Falkners also seek to modify the permit, increasing the total quantities which can be pumped by transferring previously approved quantities from another permit the Falkners currently hold. All of the relevant wells are within the District's Most Impacted Area (MIA) of the Tampa Bay Water Use Caution Area. The District allows a permit holder within the MIA to increase withdrawals from a well by transferring the quantities from another permitted well within the MIA. The other Falkner farm (the "301 farm") from which the quantities would be transferred is located approximately one-half mile to the south of the Rogers farm and is within the MIA. The District reviewed the application and, on September 29, 1995, issued its Proposed Agency Action to Issue Water Use Permit No. 206938.03. The proposed permit includes special conditions requiring monthly pumping reports, water quality reports, adherence to District irrigation allotments (irrigation levels established by the AGMOD computer model) and crop reporting. In reviewing the application the District utilized the criteria set forth in Florida Administrative Code, and the Basis of Review, incorporated into the code by reference. In order to obtain a Water Use Permit, an applicant must demonstrate that the water use is reasonable and beneficial, is in the public interest, and will not interfere with any existing legal use of water. Additionally, the applicant must provide reasonable assurances that the water use: will not cause quantity or quality changes which adversely impact the water resources, including both surface and ground waters; will not adversely impact offsite land uses existing at the time of the application; will not cause water to go to waste; and will not otherwise be harmful to the water resources within the District. The uncontroverted evidence establishes that the water use is reasonable, beneficial and is in the public interest. The Falkners irrigate farmland to produce agricultural products. The production of food is in the public interest. The proposed use is reasonable and beneficial. Further, uncontradicted evidence and opinions of expert witnesses establish that the proposed use will not interfere with any existing legal use of water. The applicant must provide reasonable assurances that the water use will not cause quantity or quality changes which adversely impact the water resources, including both surface and ground waters. The evidence establishes that pumping from the Falkner wells will not adversely affect the quality of water within the aquifers from which the water is drawn. Mr. Booth asserted that he is having water quality problems, specifically with rust in his well. The Booth well is approximately 25 years old. There is no evidence that the rust is related to the Falkner pumping. The DeVito and Booth wells draw from the Intermediate aquifer. Review of the potentiometric surface map of the intermediate aquifer indicates that there is a water level variation of 17 feet between the rainy and dry seasons. The result of the variance can be "dry" wells. There are two wells on the Falkner/Rogers property relevant to this proceeding. The first (District ID number 1) is 770 feet deep, is cased to a depth of 160 feet, and opens to the Floridan aquifer. The second (District ID number 2) is 1100 feet deep, is cased to a depth of 140 feet, and opens to the Intermediate and the Floridan aquifers. A cased well does not withdraw water from the formations through which the casing is placed. For example, a well cased to a depth of 160 feet draws no water from the top of the casing (at approximately ground level) to the bottom of the casing at 160 feet. The Intermediate aquifer releases water at a much slower rate than the Floridan aquifer. Based on the type and location of the Falkner wells, the vast majority of the water pumped by the Falkners comes from the Floridan aquifer. Impacts on existing wells are calculated through computer modeling. The "MOD" flow model demonstrates impacts that will occur after 90 days of pumping at peak month levels with no recharge to the aquifer. The MOD flow model results in a conservative "worst case" projection. The MOD flow model calculation projects the drawdown at Falkner well number 1 to be approximately .9 feet. The MOD flow model calculation projects the drawdown at Falkner well number 2 to be approximately 1.4 feet. The MOD flow model calculation projects the drawdown at the Booth well to be approximately one-half foot. The impact on the DeVito well will not exceed that projected at the Booth well. District permitting criteria allow for projected MOD flow model drawdown impacts of less than five feet at existing wells. The impact possible after approval of this application falls well within the District's guidelines. The impact of pumping if the application at issue in this proceeding is approved will result in a maximum variation of one-half foot at the Booth well. The evidence fails to establish that any problems related to water quantity encountered by the Booths are related to agricultural pumping at the Falkner farms. The evidence also establishes that, based on the existing retention and drainage system, the proposed use will not adversely impact surrounding surface water bodies. A system of swales and ditches is utilized to retain the water on the farm property. The evidence fails to establish that runoff from the Falkner/Rogers farm will adversely impact surrounding surface waters if this application is approved. The applicant has provided reasonable assurances that the water use will not adversely impact offsite land uses existing at the time of the application. The evidence establishes that the runoff from the Falkner farm does not discharge directly to the stream at the rear of the DeVito property. Other agricultural property discharges into the stream adjacent to the DeVito property. There is a steady waterflow through the stream at all times, whether or not the Falkner pumps are operating. Ms. DeVito's property consists of Myakka soil, which has little capacity to absorb rainfall and generates large amounts of runoff. The altered drainage patterns in the area have resulted in substantial water on her property. The evidence in insufficient to establish that the Falkner farm pumping has resulted in flooding on Ms. DeVito's property. The evidence fails to establish that approval of the application at issue in this proceeding will cause adverse impact to the DeVito property or will result in water quality or quantity problems. The Booths are concerned that the existing drainage system will not be maintained and that increased pumping will result in their land being flooded again. The evidence fails to establish a substantial likelihood that the Falkner farm drainage system will not be maintained. The applicant has provided reasonable assurances that the water use will not cause water to go to waste. The Falkners use a semi-enclosed seep irrigation system at the Rogers farm. Irrigation is only used when necessary. Mushroom compost, humates, and plastic mulch retain moisture in the soil. A special condition of the permit requires the Falkners investigate the feasibility of tail water recovery and reuse. The applicant has provided reasonable assurances that the use will not otherwise be harmful to the water resources within the District. The permit application results in no increased withdrawal of water than is allowed under the existing permits for the Rogers and the "301" farms.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Southwest Florida Water Management District enter a Final Order granting the Falkner application and issuing permit number 206938.03. DONE and ENTERED this 26th day of April, 1996 in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 1996. APPENDIX TO RECOMMENDED ORDER, CASES NO. 95-5763 and 95-5764 To comply with the requirements of Section 120.59(2), Florida Statutes, the following constitute rulings on proposed findings of facts submitted by the parties. Petitioners Booth The Petitioners Booth proposed findings of fact fail to comply with the requirements of Rule 60Q-2.031(3), Florida Administrative Code, which requires citations to the record of hearing. The proposed findings are rejected as irrelevant or not supported by the greater weight of the evidence except where they are consistent with the Findings of Fact set forth herein. Respondents The Respondents' joint proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 15. Rejected, cumulative. 28-29. Rejected, subordinate. 33. Rejected, subordinate. COPIES FURNISHED: Rose Ann DeVito, pro se 11001 Sumner Road Wimauma, Florida 33598 Diana P. and Charles B. Booth, pro se 10812 Sumner Road Wimauma, Florida 33598 Patricia Petruff, Esquire Dye and Scott, P.A. 1111 Third Avenue West Bradenton, Florida 34206 Martin Hernandez, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899 Peter G. Hubbell, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (1) 120.57 Florida Administrative Code (1) 40D-2.301
# 2
BRUCE LAHEY vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 03-000333 (2003)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Jan. 29, 2003 Number: 03-000333 Latest Update: May 07, 2003

The Issue The issue is whether the Southwest Florida Water Management District's (District's) proposed construction of a temporary floating weed barrier across the mouth of the canal exiting to the southwest side of Lake Hancock in Polk County, Florida, is exempt from regulatory review under Section 373.406(6), Florida Statutes.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background This proceeding involves a request by the District for authorization to construct a temporary floating weed barrier across the mouth of the canal exiting the southwest side of the Lake in Polk County, Florida (County). After reviewing the request, and based on its determination that the project would "have only minimal or insignificant individual or cumulative adverse impacts on the water resources of the State," on September 27, 2002, the Department concluded that the project qualified for an exemption from regulatory review under Section 373.406(6), Florida Statutes. The Department also authorized the District to use state-owned submerged lands, if applicable, for the construction of the project, and it found that the project was in compliance with the SPGP program and thus required no further permitting from the United States Army Corps of Engineers (Corps of Engineers). Even if the Department had not considered the project to be exempt, it concluded that it had sufficient information and assurances from the District to grant a Noticed General Environmental Resource Permit (ERP) authorizing the requested activity. On December 2, 2002, Petitioner, Bruce Lahey, who has resided and owned property on the southwest side of the Lake for 15 years and regularly uses the Lake for fishing and recreational purposes, filed a Petition for Administrative Hearing (Petition) challenging the proposed agency action. In his Petition, as later clarified and narrowed in the parties' Joint Pre-Hearing Stipulation, Mr. Lahey contends that a weed barrier is no longer necessary since there has not been a weed problem in the Lake since late 2002; that the placement of a weed barrier will make access to and from the Lake more difficult and create a safety hazard; and that in the event a problem arises again, the more desirable options for removing the weeds are "a 'cookie-cutter,' mechanical harvester, or the spraying of [the] tussocks," rather than erecting a barrier. Finally, Mr. Lahey contends that as a matter of law, Section 369.20, Florida Statutes, bars the construction of a barrier. He has not challenged the Department's authorization for the District to use state-owned submerged lands or its determination that the project complies with the SPGP program, and therefore those aspects of the proposed agency action are not in issue. Respondents do not dispute that Mr. Lahey has standing to bring this action. The Lake and Control Structure The Lake is an approximately 4,500-acre Class III waterbody located east of Highway 98 and Highland City, southeast of Lakeland, and just northeast of the City of Bartow (Bartow). It receives drainage from a significant portion of the County, including three streams and runoff from a surrounding 131-square mile watershed. Waters discharge from the Lake to Saddle Creek (the canal), which exits at the southwest end of the Lake and runs in a southerly direction for around a mile and a half until it merges with the Peace Creek, where the two then become the Peace River. At the confluence of the canal and Peace Creek, the waters flow through a broad, flat floodplain. Water moves slowly through this area, which can affect the ability of the Lake to discharge, especially during flood conditions. Like the Lake and canal, the Peace Creek also has a significant contributing basin. The canal contains a District-owned and operated water control structure known as Water Control Structure P-11 (the control structure) consisting of two twenty-foot radial arm gates that are raised when necessary to manage the water levels on the Lake and prevent the flooding of lakefront property. The control structure is approximately 3,000 feet or so south of the Lake and is the only control structure regulating water levels for the Lake. The gates are designed to discharge at a flow level of 1,100 cubic feet per second (cfs). The invert elevation of the control structure is 91.7 feet and the crest elevation is 98.7 feet. Flows from the Lake will exceed 1,100 cfs when the water levels are higher than the crest elevation of the structure. At this point, water flows over the structure’s weirs and flood control is no longer provided. The maximum desirable water elevation level for the Lake is 98.5 feet above mean sea level (msl). Typically, the District begins to operate, or open, the control structure when the Lake's water elevation reaches 98.25 feet msl. A water level of 99.0 feet msl is considered minimum flood level (or high guidance level). The low management water elevation (low guidance level) is 96.0 feet msl. These established water levels have been maintained at the Lake since approximately 1981. The District seeks to hold the water level of the Lake close to the maximum desirable level, and typically tries to hold the water level at 98.25 feet msl, which is slightly below the maximum desirable level of 98.5 feet msl, to allow storage of water and some response time. The control structure is intended primarily to be a water conservation structure that regulates the Lake's water levels to benefit the water resources, to include the Lake and the Peace River. In managing the Lake's levels, the District balances conservation of the water resource and public safety/flooding concerns. The Lake's water level elevations are monitored through the District’s Supervisory Control and Data Acquisition System (SCADA), which measures the water level and transmits hourly data to the District offices via satellite. SCADA monitors are located immediately upstream and downstream of the control structure. Since the tussock blockage events in the summer and fall of 2002, described more fully below, the District has installed an additional SCADA monitor on the north end of the Lake so that water levels in the Lake and canal can be compared. The Lake does not have direct public access or a public boat ramp and is not easily accessible. In addition, in the canal, there is only one unimproved location upstream from the control structure where boats can be placed in the water and gain access to the Lake. That portion of the canal which lies between the Lake and the control structure has not always been open to boat access. In the 1980’s, a floating weed barrier extended across the canal approximately 1,000 feet upstream from the current control structure, which blocked the canal and boat access. This floating weed barrier was installed primarily to address problems with water hyacinths that would float down the canal and interfere with the control structure. This floating barrier gave way sometime in the 1990’s. An earlier control structure also used to exist in this area, which blocked canal access. Navigation of the canal is limited due to the existence of the control structure and a number of other blockages further downstream, including a low bridge where old Highway 17 crosses the canal. Thus, boats coming from the Lake cannot navigate down the canal any further than the control structure, or slightly more than one-half mile, without taking the boat out of the water. Between 1999 and 2001, the District experienced one of the most severe droughts on record. During this time, the Lake went dry except for some isolated pools of water. Because of these conditions, a significant amount of wetland or aquatic vegetation began to grow on the exposed bottom of the Lake. The Lake historically did not support much plant growth, due to its eutrophic condition, poor water quality, and gelatinous mucky lake bottom. The types of vegetation currently existing in the Lake include cattails, pickerelweed, duck potato, and primrose willow. Following the return of summer rains and El Nino conditions in 2002, the Lake rebounded to within normal water levels. Because of the return of water in the Lake, the buoyant pressure of the water combined with the flaccid nature of the mucky lake bottom caused significant portions of vegetation to become uprooted, which formed an extensive amount of tussocks. Tussocks are floating mats of uprooted aquatic vegetation. They contain plant and organic material accumulated around the plant roots, can range from a few feet across to one hundred feet across or larger, and can reach a height of more than four feet. Once tussocks form, they move about the Lake by wind and water currents. The amount of vegetation currently existing in the Lake exceeds historic levels. At the present time, the District estimates that approximately 2,000 acres of the Lake are covered with tussocks, and that due to the flaccid nature of the lake bottom, the tussocks are susceptible to becoming uprooted through fluctuating water levels, wind, and wave action. Therefore, there is a strong potential that much of the currently rooted vegetation will form tussocks. Tussocks first impacted the District’s ability to operate the control structure in July 2002. During this event, the canal became partially filled with tussocks. Because the blockage occurred during the rainy and hurricane seasons, the District undertook efforts to clear the canal of tussocks. District staff used mechanical equipment commonly called a cookie cutter to break up the tussocks and flush them downstream through the control structure. During this tussock event, the Lake's water levels rose briefly above the maximum desirable level of 98.5 feet msl and then fell back to within normal elevations. In late August 2002, approximately three weeks after the first tussock blockage event, a number of homeowners on the Lake, including Petitioner's wife, contacted District staff to advise that the water level of the Lake was rising and flooding their yards. A rise in water levels did not register on the District’s water level monitoring SCADA system. Visual observation of the Lake did reveal, however, that there was a significant difference between the water levels being experienced on the Lake and the water levels reported at the control structure via the SCADA system. During this tussock event, masses of tussocks had completely filled the 3,000-foot length of the canal all the way to the control structure and were jamming against the control structure gates. Tussocks had also formed a vegetation dam approximately 900 to 1,400 feet north of the control structure where they compacted and became lodged on the bottom of the canal, significantly impeding the flow of water. During this event, flows out of the Lake were significantly diminished to a fraction of what they should have been. The tussock dam caused the Lake's level to rise above the minimum flood elevation of 99.0 feet and flood Petitioner's yard. There was an approximately one to one and one-half foot difference in the water levels in the Lake and in the canal. In response to this disparity, the District installed a third water level elevation monitor at the northern end of the Lake, so that it can monitor any differences in water elevations between the Lake and the canal and be alerted in the event that a blockage occurs in the canal. To eliminate the tussock blockage and restore flow through the control structure, the District had to employ mechanical means to break up and remove the tussocks. At the control structure, a trac-hoe was initially used in an attempt to force tussocks through the control structure, as tussocks would not flow through the structure unassisted. A cookie cutter was also employed, but it became sucked into the control structure and was damaged and had to be removed with a crane and repaired. The cookie cutter proved ineffectual in addressing the tussock blockage problem. If the canal were to again become clogged with tussocks, any resulting blockage of flow from the Lake would cause water levels to rise, which would endanger public safety and welfare. Prior to the tussock blockages experienced in the summer and fall of 2002, problems with tussocks had never been experienced at the Lake. The magnitude of the tussock formation on the Lake is unique and has not been experienced elsewhere in the District. In 2002, the Department expended over $46,000.00 in contracting for mechanical equipment and for spraying herbicide on tussocks to respond to the tussock buildup on the Lake. Since their formation after the summer of 2002, tussocks have blocked Petitioner's access to his dock on several occasions, thereby preventing him from being able to take his boat out into the Lake or to return to the dock once out on the Lake. The potential for similar blockages to occur remains, regardless of whether a floating weed barrier is erected as proposed. The direction of the winds is a major factor in determining where and how many tussocks will stack up in front of anyone’s property along the Lake. Access to the canal could become blocked with tussocks at any time, depending upon how the wind blows. Breaking up tussock blockages and flushing tussocks through the control structure does not eliminate water resource problems for the District. Tussocks that are pushed through the control structure cause downstream problems requiring the District to expend resources to push the tussocks through and under low downstream bridges crossing the canal, as well as break up tussock blockages that form in downstream waters. In January 2003, tussocks again accumulated at the control structure in such volume as to require assistance in flushing through the control structure. As a result of the large volume of tussocks pushed through the control structure, a tussock blockage occurred at a downstream bridge crossing, for which the District had to use mechanical equipment to restore flow. During March 2003, tussocks flushed through the control structure created a jam downstream on the Peace River. The tussocks were jammed up in a bend in the river and were blocking navigational access to the river. An El Nino weather cycle is currently being experienced. Water levels, including the Lake's water level, are already at their maximum and the ground is saturated. Localized flooding events have occurred. A very active summer rainy season is anticipated, which will mean significant flood control operations for the District. As the summer season approaches, the District must keep the control structure open and operational, which requires that the canal be kept open and flowing. A floating weed barrier at the entrance to the canal would keep tussocks from clogging the canal and prevent problems affecting operation of the control structure, downstream tussock blockages, and possible flooding. The Project To address the problem of tussocks entering the canal and causing blockages or possible flooding, on September 11, 2002, the District applied to the Department for a Noticed General ERP under Rule 62-341.475(1)(a), Florida Administrative Code, to authorize the construction of a floating weed barrier at the entrance to the canal. On September 27, 2002, the Department issued its notice of intent to authorize the requested activity. The proposed barrier will be constructed in two sections arranged at approximately 90-degree angles to each other, with a twenty-foot opening between the sections to allow boat access to the canal. A schematic drawing of the barriers is found in District Exhibit 5 received in evidence. As originally proposed, the barrier would consist of a total of sixteen nine-inch diameter pilings driven twenty-one feet apart, with twenty-foot sections of floating foam-filled polyvinyl chloride pipe (pvc) connected to the pilings. Pilings will be marked with reflective tape and five of the pilings will have three-foot diamond-shaped reflective danger signs reading "DANGER PILE/FLOAT BARRIER" placed on their upstream and downstream sides. The pilings are twenty-five feet in length and will extend above the Lake's water level approximately twelve to fourteen feet. Since the District's submittal of the application and the Department's authorization notice, the District has located commercially manufactured floating booms, called "Tuffbooms," that, if authorized, will be installed in lieu of the foam-filled pvc pipes. Use of these booms reduces the number of pilings needed from sixteen to eight, and their bright orange color is more visible than pvc piping. All other aspects of the proposed activity remain the same. The change in material to be used in the construction of the proposed floating barrier does not present any water quality issues, nor does it affect the Department's determination that the proposed activity will have minimal or insignificant adverse impacts on the water resources. The staggered layout of the proposed floating weed barrier is intended to keep tussocks in the Lake, where they can remain subject to the winds, while providing boat access to the canal in such a manner that is more difficult for tussocks to enter the canal. The Department's Exemption Process The Department's Tampa District Office routinely approves around 800 projects each year under various exemptions authorized by statute or rule. One type of exemption is found in Section 373.406(6), Florida Statutes, referred to as the de minimus exemption, which allows the Department to exempt from regulation those activities that are determined will have only minimal or insignificant individual or cumulative adverse impacts on the water resources of the District. The Department is authorized to make this determination on a case-by-case basis. In determining whether an activity qualifies for a de minimus exemption from permitting, the Department looks for parallels to other specific statutory or rule exemptions and analyzes the proposed activity similarly in terms of its scope, construction methods, potential to create water quality impacts or impediments to navigation, and other factors, because these recognized exemptions are also deemed to have minimal or insignificant impacts to the water resources. There is no specific exemption for a floating weed barrier as proposed by the District, but the Department considers this type of project to be similar in scope and potential impacts to other specific activities that have been determined to have minimal or insignificant adverse impacts to the water resources, such as docks and other piling-supported structures, navigational aids, and buoy systems. In assessing whether a project is appropriate for the de minimus exemption, the Department also looks to the criteria for Noticed General ERPs for guidance in determining whether a proposed project will have minimal or insignificant adverse individual or cumulative impacts upon the water resources. Under Section 373.406(5), Florida Statutes, the Department may by rule establish general permits for activities that have, either singularly or cumulatively, minimal environmental impact. Chapter 62-341, Florida Administrative Code, sets forth the Noticed General ERPs established by the Department. Department Rule 62-341.475(1)(a), Florida Administrative Code (as does District Rule 40D-400.475(1)(a), Florida Administrative Code), allows noticed general permits for piling supported structures of less than 1,000 square feet over wetlands or other surface waters, which are not designated Outstanding Florida Waters. To qualify for a noticed general permit for such activity, an applicant must provide reasonable assurance that the proposed structure: Does not significantly impede navigation and does not entail the construction of a structure for the launching or mooring of a boat when navigational access to the structure does not currently exist; Does not cause a violation of state water quality standards; Does not impede the conveyance of a stream, river or other watercourse in a manner that would increase off-site flooding; Does not adversely impact aquatic or wetland dependent listed species; Does not cause the drainage of wetlands; and Is not located in, on or over a coral community, macro-marine algae or submerged grassbed community. Will the Project Impact Water Resources? The District’s proposed floating weed barrier will involve less than 7.1 square feet of impact to the water resources, which is significantly less impact in square footage to the water resources than is allowed by Rule 62- 341.475(1)(a), Florida Administrative Code, or occurs with other specified exempt projects. Best management practices will be used in the erection of the pilings and in the construction of the barriers. Pilings will be jetted into the lake bottom without need for any dredging or lake bottom removal. Installation of a floating weed barrier will not result in any significant detriment to existing conditions in the Lake or the canal. Installation of the proposed floating weed barrier will benefit the public interest and the water resources by allowing unimpeded operation of the control structure without risk of tussocks causing blockages and flooding. Installation of the proposed floating weed barrier will not have significant adverse impacts on fishing, boating, or recreational use of the Lake or canal. A blockage of the canal entrance by tussocks, or a tussock jam anywhere on the Lake, could occur under present conditions, and similar blockages have already occurred. The potential for tussocks to block the opening between the sections of the floating weed barrier is considered remote and of temporary duration, due to the potential for shifting winds. The District’s proposed floating weed barrier is a reasonable means of addressing the continuing potential for tussocks to interfere with operation of the control structure. Use of mechanical equipment such as a cookie cutter or harvester would not be an effective or economical means of addressing tussock blockages in the canal or preventing their occurrence and possible interference with operation of the control structure. Pushing tussocks through the control structure would not be an effective means of addressing the potential for tussocks to cause blockages and possible flooding. Merely pushing the material through the control structure moves the potential blockage problem downstream and does not alleviate the potential for tussocks to cause adverse impacts to the water resources of the District. Spraying tussocks with herbicides would not be an effective means of addressing tussock blockages due to the fact that, once treated, tussocks can take weeks to die and fall to the lake bottom. Floating tussocks are and will continue to be treated with herbicide sprays when found in the Lake to reduce the amount of tussocks. However, once tussocks enter the canal, spraying serves little benefit in preventing tussocks from causing blockages or other problems. Tussocks originate in the Lake and not in the canal. Tussocks in the Lake have had and likely will continue to have an impact on boating and recreational use of the Lake and canal, as evidenced by tussock blockages to Petitioner's dock. By confining the tussocks to the Lake, the potential for tussocks to impact boating and recreational use of the Lake will remain the same as current conditions, but the potential for tussocks to affect operation of the control structure and contribute to Lake flooding will be eliminated. Petitioner contends that the proposed floating weed barrier will impede navigation, either by itself or as a result of tussocks piling up in front of the barrier. The proposed barrier will be marked and visible through reflective tape and signage. The barrier does not create a navigational hazard and is not a significant impediment to access to the canal. Constructed in two sections, the barrier provides an opening that allows boat access to the canal. As noted above, the likelihood of tussocks piling up at the barrier and blocking the opening between the barrier sections is considered remote and temporary. Based upon the information provided by the District, the proposed floating weed barrier will not significantly impede navigation; will not cause a violation of state water quality standards; will not impede the conveyance of a stream, river, or other water course in a manner that would increase off-site flooding; will not adversely impact aquatic or wetland dependent listed species; and will not cause the drainage of wetlands. There is no evidence that the proposed activity is located in, on, or over a coral community, macro-marine algae, or submerged grassbed community or that it entails the construction of a structure for the launching or mooring of a boat for which navigational access does not currently exist. The proposed activity would have only minimal or insignificant individual or cumulative adverse impacts on the water resources of the District. As an activity that has minimal or insignificant adverse impacts on the water resources of the District, either individually or cumulatively, the District’s project qualifies for an exemption pursuant to Section 373.406(6), Florida Statutes, as well as a Noticed General ERP under Rule 62- 341.475(1)(a), Florida Administrative Code. The Department's exemption determination authorized the District’s floating weed barrier for one year, presumably so that the effectiveness of the barriers can be evaluated during that period of time. If they are effective, an extension or renewal of the authorization will be sought. If the tussocks problem becomes less acute, or the barriers do not achieve the desired purpose, they will be taken down. In contrast, Noticed General ERPs authorize a particular activity for five years. Other Contentions by Petitioner Petitioner has also contended that the proposed activity may violate a condition of the District's Corps of Engineers general permit by interfering with general navigation. As found earlier, however, the more credible evidence indicates otherwise. Moreover, it is presumed that this issue was considered by the Corps of Engineers prior to its approval of the project. In any event, that matter should be raised with the Corps of Engineers, and not with the Department. Finally, Mr. Lahey contends that since at least late 2002, the Lake has been free of a tussocks problem and therefore barriers are no longer needed. As noted above, however, blockages have occurred at the control structure and in the Peace River as recently as January and March 2003, and such blockages were the direct result of tussocks which originated in the Lake. Given the likelihood of a very active summer rainy season, it is essential that the canal be kept open so that the District can properly manage and control the water resources.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection issue a final order determining that the Southwest Florida Water Management District's proposed project qualifies for an exemption under Section 373.406(6), Florida Statutes; that authorization to use state-owned lands be given; and that the project is in compliance with the State Programmatic General Permit program. DONE AND ENTERED this _____ day of May, 2003, in Tallahassee, Leon County, Florida. ___________________________________ DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this _____ day of May, 2003. COPIES FURNISHED: Kathy C. Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Bruce Lahey 5280 Waterwood Drive Bartow, Florida 33830-9766 Martha A. Moore, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899 Doreen Jane Irwin, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Teri L. Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000

Florida Laws (4) 120.569120.57369.20373.406
# 3
JACQUELINE LANE vs DEPARTMENT OF ENVIRONMENTAL PROTECTION AND INTERNATIONAL PAPER COMPANY, 05-001610 (2005)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida May 04, 2005 Number: 05-001610 Latest Update: Aug. 09, 2007

Conclusions On May 11, 2007, the Division of Administrative Hearings (‘DOAH’) submitted a _ Recommended Order (“RO”) to the Department of Environmental Protection (‘DEP’) i in . these consolidated proceedings. Copies of the RO were served upon the Petitioners, Mellita A. Lane, Jacqueline M. Lane, Peter A. Lane, (“Lane Petitioners”); Friends of Perdido Bay,.Inc., and James A. Lane (“FOPB”); and the Co-Respondent, International Paper Company (“IP” ). On May 29, 2007, all Petitioners and Respondent IP filed Exceptions to the RO. Respondent DEP filed Exceptions to the RO and Motion for Remand. ; On June 8, 2007, the FOPB filed a Reply to IP’s Exceptions and a Response to DEP’s Motion for Remand and Exceptions. The Lane Petitioners filed their Response to iP’s and DEP’s Exceptions. Respondent DEP filed Responses to the Exceptions filed . by the FOPB, the Lane Petitioners and IP. Respondent IP filed Responses to the Exceptions of FOPB, the Lane Petitioners and DEP. This matter is now before me for. final agency action. . _ BACKGROUND » Florida Pulp and Paper Company first began operating the Cantonment paper mill in. 1941. St. Regis Paper Company (St. Regis” ) acquired the mill in 1946. In 4984, Champion International Corporation (“Champion”) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such a as printing and writing grades c of paper. In 2001, Champion merged with IP, and IP took over operation of the mill. The primary product of the mill continues to | be printing and writing paper. ' The mill s wastewater effluent i is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. The creek flows southwest into the northeastern portion of Perdido Bay. Elevenmile Creek is a freshwater stream for most of its length but is . sometimes tidally affected one to two miles from its mouth. Elevenmile Creek is designated as a Class I water. Perdido Bay is approximately 28 square miles in area and is bordered by Escambia County on the east and Baldwin County, Alabama, on the west. The dividing line between ‘the states runs north and south in the approximate middle of Perdido Bay. U.S. Highway 98 crosses the Bay, going east and west, and forms the boundary between what is-often referred to as the “Upper Bay” and “Lower Bay.” The Bay is relatively shallow, especially | in the Upper Bay, ranging in depth between five and ten feet. Perdido Bay i is designated asa Class ill water. Sometime around 1900, a manmade navigation channel was cut through the narrow strip of land separating Perdido Bay from the Gulf of Mexico. The channel, called Perdido Pass, allowed the salt waters of the Gulf to move with the tides up into Perdido Bay. Depending on tides and freshwater inflows, the tidal waters can move into the most northern portions of Perdido Bay and even further, into its tributaries and wetlands. The Perdido River flows into the northwest portion of Perdido Bay. Itis primarily a freshwater river but itis sometimes tidally influenced at and near its mouth. The Perdido River was designated an Outstanding Florida Water (“OFW’) in 11979. At the north end of Perdido Bay, between Elevenmile Creek and the Perdido River, isa large tract of land owned by IP called the Rainwater Tract, The northern part of the tract is primarily freshwater wetlands. The southern partis a tidal marsh. Tee and Wicker Lakes are small (approximately 50 acres in total surface area) tidal ponds within the tidal marsh. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to Tee and Wicker Lakes from Perdido Bay. | ' Before 1995, the mill had to have both state and federal permits. The former Florida Department of Environmental Regulation (‘DER’) issued St. Regis an industrial wastewater operating permit in 1982 pursuant to Chapter 403, Florida Statutes. The United States Environmental Protection Agency ("EPA") issued St. Regis a National Pollutant Discharge Elimination System (“ NPDES") permit i in 1983 pursuant to the Clean Water Act. When it acquired the facility in 1984, Champion continued to operate the mill under these two permits. In 1986, Champion obtained a construction permit from DER to install the oxygen delignification technology and other improvements to its wastewater treatment plant (‘WWTP’) in conjunction with the conversion of the production process from an unbleached to a modified bleached kraft production - process. In 1987, Champion applied to DER for an operating permit-for its modified WWITP and also petitioned for a variance from the Class iI water quality standards in Elevenmile Creek for iron, specific conductance, zinc, and transparency. DER's . subsequent proposal to issue the operating permit and variance was formally challenged. In 1988, while the challenges to the DER permit and variance were still pending, Champion dropped its application for the operating permit and requested a . temporary operating permit ("TOP"), instead. In December 1989, DER and Champion entered into Consent Order No. 87-1398 (‘the 1989 Consent Order’). The 1989 Consent Order included an allegation by DER that the mill's wastewater discharge was causing violations of state water quality standards in Elevenmile Creek for dissolved oxygen (“DO”), un-ionized ammonia, and biological integrity. The 1989 Consent Order authorized the continued operation of the mill, but established a process for addressing the water quality problems in Elevenmile Creek and Perdido Bay and bringing the mill into compliance in the future. Champion was required to install equipment to increase the DO in its effluent within a year. Champion was also required to submit a plan of study and, 30 months after DER's approval of the plan of study, to submit a study report on the impacts of the mill's effluent on DO in Elevenmile Creek and Perdido Bay and recommend measures for reducing or eliminating adverse impacts. The study report was also supposed to address the other water quality violations caused by Champion. A comprehensive study of the Perdido Bay system was undertaken by a team of 24 scientists lead by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed bya series of related scientific studies, which are referred to collectively in the RO as “the Livingston studies.” The 1989 Consent Order had no expiration date, but it was tied to the TOP, , which had an expiration date of December 1, 1994. Champion was to be in compliance with all applicable water quality standards by that date. The mill was not in compliance with all water quality standards in December 1 994. No enforcement action was taken by the Department and no modification of the 1989 Consent Order or TOP was formally proposed that would have provided a point of entry to any members of the public who might have objected. instead, the Department agreed through correspondence with . Champion to allow Champion to pursue additional water quality studies and to investigate alternatives to its discharge to Elevenmile Creek. - In 1994 and 1995, Champion applied to renew its state and federal wastewater permits, which were about to expire. The Department and EPA notified Champion that its existing permits were administratively extended during the review of the new permit applications. Today, the Cantonment mill is still operating under the 1989 TOP which, due to the administrative extension, did not terminate in December 1994, as stated on its face. In November 1 995, following EPA's delegation of NPDES permitting authority to the Department, the Department issued an order combining the state and federal ‘operating permits into a single permit identified as Wastewater Permit Number FLO002526-002-IWF/MT. During the period from 1992 to 2001, more water quality studies were conducted and Champion investigated alternatives to discharging into upper Elevenmile Creek, including land application of the effluent and relocation of the discharge to lower Elevenmiie Creek or the Escambia River. . In September 2002, while Champion's 1994 permit renewal application was still pending at DEP, IP submitted a revised permit renewal application to upgrade the WWTP and relocate its discharge. The WwTP upgrades consist of converting toa. modified activated sludge treatment process, incteasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (‘MGD’). IP proposes to convey the treated effluent by-pipeline 10.7 miles to the 1,464-acre wetland tract owned by IP (contained within-the larger Rainwater Tract), where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and Upper Perdido Bay. IP revised its permit application again in October 2005, to obtain authorization to: reconfigure the mill to produce unbleached brown paper for various grades of boxes. If the mill is reconfigured, only softwood (pine) would be used in the new process. On April 12, 2005, the Department published notice of its intent fo issue a proposed permit, consent order, experimental wetland exemption, and waiver. The — Department authorizations would allow IP to change its industrial wastewater treatment system at the mill, construct an effluent distribution system within the wetland tract, construct the 10.7-mile pipeline to transport its treated wastewater to the wetlands, and discharge the treated wastewater into the wetlands. In April 2005, Mellita A. Lane, Jacqueline M. Lane, Zachary P. Lane, Peter A. Lane, and Sarah M. Lane (“Lane Petitioners”) filed identical petitions challenging the Department authorizations on numerous grounds. The Department forwarded the petitions to DOAH for assignment of an Administrative Law Judge (“ALJ”) and to conduct an evidentiary hearing. The Lane Petitioners subsequently amended their petitions. In May 2005, Friends of Perdido Bay, Inc., and James Lane filed a petition for | hearing to challenge the Department authorizations. The FOPB petition was forwarded to DOAH and the pending cases were consolidated for the fi nal hearing. The FOPB petition was subsequently amended. In October 2005, while the cases were pending, IP applied for a revision to its NPDES permit renewal application. The cases were abated so that the DEP could review and act on the permit revision. In January 2006, DEP issued a proposed revised | NPDES permit and a corresponding First Amendment to Consent Order. On July 26, 2006, the Department filed without objection a revision to the Consent Order. On July 31, 2006, the Department filed Joint Trial Exhibit 18 that integrated the Consent Order dated April 12, 2005, the First Amendment to Consent Order dated January 11, 2006, and the Department’s Notice of Minor Revision {o Consent Order filed on July 26, 2006. The DOAH Administrative Law Judge CALL") held a lengthy final hearing in these consolidated cases on May 31, June 1, 2, and.26 through 30, and July 17, 27, and 28, 2006. Prior to the hearing, the parties filed their Joint Pre-Hearing sit on May 24, 2006. The ALJ subsequenty submitted his RO on May 11, 2007. -

# 4
PHILLIPS PETROLEUM COMPANY vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-001562 (1975)
Division of Administrative Hearings, Florida Number: 75-001562 Latest Update: Mar. 21, 1977

The Issue Whether a consumptive use permit for the quantities of water applied for should be granted.

Findings Of Fact Applicant Phillips Petroleum Company submitted application Number 7500103 for a consumptive use permit for an average daily withdrawal of 9,000,000 gallons of water a day to be withdrawn from the Florida Aquifer in DeSoto County, Florida. The application is for a new use and the withdrawal is for industrial use from four withdrawal points. The center of withdrawals will be located at Latitude 27 degrees, 14 minutes, 40 seconds north. Longitude 82 degrees, 2 minutes, 48 seconds west, in DeSoto County. Notice of the September 3, 1975 public hearing was published in a newspaper of general circulation, to wit: The Arcadian on August 14 and 21, 1975, pursuant to Section 373.146, Florida Statutes. Notice of the continuation of the hearing held at 10:30 a.m., December 11, 1974 were duly noticed. Sarasota County was granted leave to intervene as a party to the proceeding. Evidence was received and testimony was heard by all parties at the September 3, 1975 hearing and evidence was received and testimony was heard by she Applicant and Intervenor at the December 11, 1975 hearing, and although the attorneys for the Southwest Florida Water Management District took no further part in the December 11, 1975 hearing on the merits, depositions of the Southwest Florida Water Management District staff members, James Mann and Barbara Boatwright, were received. Phillips Petroleum Company owns approximately 15,200 acres of land in DeSoto County and Manatee County and proposes to commence a phosphate mining operation on that property using a total of 15 million gallons of water per day, 9,000,000 gallons per day (MGD) from DeSoto County and 6 million gallons per day (MGD) from Manatee County. This application for a permit is for the 9 million gallons of water to be withdrawn from an 8,700 acre parcel owned by the Applicant in DeSoto County, Florida. As such it presumptively seeks withdrawal and consumptive use of no more than the average annual water crop for this parcel. Pursuant to the water crop theory, the water crop for the 8,700 acres contro led by the Applicant in the Southwest Florida Water Management District is 8.7 million gallons of water per day. However, as shown by correspondence of a hydrologist from Southwest Florida Water Management District, a phosphate mining operation is only 90 percent consumptive and therefore the actual consumptive use is 7.8 million gallons per day and falls within the water crop theory assumption set forth in Rule 16J-2.11(3), F.A.C., infra. The statutory criteria for granting a consumptive use permit is found in Section 373.223, Florida Statutes, which states: "(1) To obtain a permit pursuant to the provisions of this chapter, the applicant must establish that the proposed use of water: Is a reasonable-beneficial use as defined in 474.019(5); and Will not interfere with any presently existing use of water; and Is consistent with the public interest. (2) The governing board of the department may authorize the holder of a use permit to transport and use ground or surface water beyond overlying land or outside the watershed from which it is taken if the governing board or department determines that such transport and use is consistent with the public interest." This statute has been supplemented by rules adopted by the Southwest Florida Water Management District and is found in Rule 16J-2.11, F.A.C.: "16J-2.11 Conditions for a Consumptive Use Permit. The intended consumptive use: Must be a reasonable, beneficial use. Must be consistent with the public interest. Will not interfere with any legal use of water existing at the time of the application. Issuance of a permit will be denied if the withdrawal of water: Will cause the rate of flow of a stream or other watercourse to be lowered below the minimum rate of flow established by the Board. Will cause the level of the potentiometric surface to be lowered below the regulatory level established by the Board. Will cause the level of the surface of water to be lowered below the minimum level established by the Board. Will significantly induce salt water encroachment. Will cause the water table to be lowered so that the lake stages or vegetation will be adversely and significantly affected on lands other than those owned, leased or otherwise controlled by the applicant. Issuance of a permit will be denied if the amount of water consumptively used will exceed the water crop of lands owned, leased, or otherwise controlled by the applicant. (Except where determined otherwise, the water crop [precipitation less evapotranspiration] throughout the District will be three hundred sixty-five thousand (365,000) gallons per year per acre.") The United States Geological Survey and the Florida Department of Environmental Relation have received data supplied to Southwest Florida Water Management District with the application for a consumptive use permit. Throughout the course of the hearing testimony was heard and evidence was received as to the "leakance value" of the parcel of land in question. "Leakance value" was defined as the moving of water from the surface down into the deeper aquifer. A geologist, Mr. Donald S. Kell, with the Department of Environmental Regulation, and who testified at the request of the Intervenor, Sarasota County, was of the opinion that insufficient data to determine leakance value in connection with the mining operation had been submitted and therefore further tests were needed. Mr. Jack Hickey of the United States Geological Survey was of the opinion that leakance value had not been obtained. The technical staff members of the Southwest Florida Water Management District were uncertain as to whether reliable leakance value had been obtained. It was the position of the Intervenor, Sarasota County, that due to the geological conditions of the proposed mining operation, this leakance value or surface recharge into the aquifer was insufficient and was not in conformity with Southwest Florida Water Management District's water crop theory assumption of 1,000 gallons per acre per day. Although evidence was presented on this point, it is the finding of this Hearing Officer that such evidence was insufficient to establish the basis of, any finding of fact or to rebut the assumption contained in the above referenced rule. The validity of this rule was not challenged and the presumption is that the rule is valid. The water used in the flotation process of applicants mining and benefication process would be recycled and reused in other areas of the phosphate operation. A letter of objection by Donald T. Yeats was examined and considered in this Order. The Applicant presented evidence that the construction of the facility would be in excess of $94 million expended over a period of 3 years, 61 percent of which would be spent in the region. 350 people would be employed at full production. Additional support jobs would employe from 200-400 people. Evidence was presented by the Applicant and was not rebutted by the Intervenor or by the Southwest Florida Water Management District as to each of the applicable conditions for a consumptive use permit in Chapter 16J-2.11, Rules of the Southwest Florida Water Management District, effectuating the provisions of Chapter 378, Florida Statutes.

Recommendation That the Southwest Florida Water Management District approve Phillips Petroleum Company's application for a consumptive use permit as requested, subject to the following terms and conditions: Prior to commencing withdrawals, Phillips Petroleum shall notify the District of said commencement; All production wells will be equipped with appropriate flow deters or other measuring devices; Phillips shall submit periodic reports of withdrawal to the District; and Phillips shall install appropriate observation wells or other monitoring facilities. DONE and ORDERED this 12th day of January, 1976. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: Jacob D. Varn, Esquire Carlton, Fields, Ward, Emmanuel, Smith & Cutler 2000 Exchange Bank Building Tampa, Florida Jay T. Ahern, Esquire Southwest Florida Water Management District Post Office Box 457 Brooksville, Florida Richard E. Nelson, Esquire Richard L. Smith, Esquire Nelson, Payne, Hesse and Cyril 2070 Ringling Boulevard Sarasota, Florida

Florida Laws (3) 120.57373.146373.223
# 5
DR. OCTAVIO BLANCO vs GPG, INC AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 08-003053 (2008)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Jun. 23, 2008 Number: 08-003053 Latest Update: Nov. 19, 2008
Florida Laws (3) 120.569120.59557.105 Florida Administrative Code (2) 28-106.20140D-4.101
# 7
PAT NATHE GROVES, INC. vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-000544 (1975)
Division of Administrative Hearings, Florida Number: 75-000544 Latest Update: Oct. 29, 1990

Findings Of Fact Mr. George Szell was presented by the Southwest Florida Water Management District and sworn as a witness. Mr. Szell was qualified and accepted as an expert hydrogeologist employed by the District. Included within Mr. Szell's responsibilities to the District were evaluation of the subject application. An application for consumptive water use permit has been filed in proper form by Pat Nathe Groves, Inc., and admitted into evidence as Exhibit A. The water source is an existing well located on a 134-acre tract in Pasco County within the Withlacoochee Basin, as shown by Exhibit A. The water is to be used for irrigation purposes. The maximum daily withdrawal sought is 432,000 gallons and the average gaily withdrawal sought is 42,608 gallons. Proper notice of this proceeding and application have been given to all persons entitled thereto by statute and rule. No objections to the application have been received by the District. The amount of withdrawal requested is 92.20 percent of the maximum average daily withdrawal allowed by the water crop theory, as set forth in Section 16J-2.11(3), F.A.C. Therefore, the requested withdrawal is not violative of the consumptive use test. Pursuant to Mr. Szell's testimony, none of the matters set forth in Subsection 161-2.11(2), (3), and (4) exist so as to require the denial of this permit.

Florida Laws (1) 92.20