Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
KATIE HALL, HENRY C. TUCKER, POLLY TUCKER, ET AL. vs. JACKSON COUNTY BOARD OF COUNTY COMMISSIONERS, 83-000824 (1983)
Division of Administrative Hearings, Florida Number: 83-000824 Latest Update: Nov. 01, 1991

Findings Of Fact Respondent Jackson County proposes to build a Class I landfill in western Jackson County, about 1.5 miles south of Campbellton on the west side of State Road 273. The named petitioners live near the proposed site, and all parties stipulated to petitioners' standing or party status on account of the proximity of their homes. The forecast is that the proposed landfill would be in service for 15 years, during the last of which it would receive wastes generated by 16,000 persons. Contingent on issuance of the construction permit it seeks in these proceedings, Jackson County has agreed to purchase 85 to 89 acres in section 15, township 6N, range 12W, of which 55 acres would be devoted to the proposed landfill. About ten of the remaining acres are covered by the southern reaches of Grant Pond. Grant Pond may be a sinkhole, but there is no connection between its waters and the Florida aquifer. There is no evidence of sinkhole activity on the site at the present time. One hundred ten feet from the southwest boundary of the proposed site long-time residents have shallow wells from which they once drew water with buckets. There are mostly small farms in the area. A trailer and 6 to 8 homes are located within 1,000 yards of the proposed site. LEACHATE NOT ANTICIPATED Jackson County contemplates eventually dumping 215 cubic yards daily of residential, commercial and agricultural wastes including sewage sludge, in a series of "cells" to H developed seriatim on the site. Developing a cell would entail digging a pit 15 feet deep, 200 feet wide and 650 feet long, lining it with some of the clay removed in excavating, and compacting the two-foot-thick clay bottom liner to 90 percent Proctor. The uncontroverted testimony was that such a liner would be impermeable. A cell is expected to accommodate about a year's worth of refuse. The plan is to have one cell in operation and another in reserve at all times. Waste would be compacted and then covered over with clay soils daily to minimize the possibility of leachate formation. In addition, a six-inch layer of clay would be put down at the end of each "lift," more or less weekly. Once the cell was completely filled, it would be covered with an even thicker layer of clay and/or other materials specified by applicable regulations. Against the possibility of leachate formation before the cell is finally sealed off, the bottom of the cell would be sloped (4:1) so that any leachate generated would accumulate at one point in the cell, from which it could be pumped to a leachate holding pond. The leachate holding pond is also to be lined with impermeable clays. The engineer who designed the project predicts that no leachate whatsoever will be generated and the project plans do not identify the specific method for disposing of leachate, once it reaches the holding pond. Depending on the quality and consistency of any leachate, it could be left in the holding pond to evaporate, or be removed by truck for disposal off site; or be treated biologically and/or chemically before being spread on site. STORMWATER The stormwater management system consists of a series of elongated detention ponds and two ditches, or swales, that drain into Grant Pond. The detention ponds are to be 1.2 feet deep, have varying widths (26.5 to 64 feet), with sides sloping at a 4:1 ratio, and vary in length from 1,000 to 1,600 feet. Water that would accumulate in them as a result of 3.2 inches of rainfall (the amount a 25-year one-hour storm would bring) would fill the ponds. The ponds are designed to overflow through baffled culverts along the swales into Grant Pond. The soils are such that 3.2 inches of rainfall could percolate into the unsaturated soil from the holding ponds in 72 hours. The closest baffle to Grant Pond would be some 200 feet distant; significant sheet flows would also enter Grant Pond. The landfill is designed to insulate stormwater runoff from contamination by waste or leachate. Only when wastes in an almost filled cell had not yet been covered would there be danger that stormwater falling on wastes would end up in the flow of stormwater draining across the surface of the proposed site and ultimately into Grant Pond. This danger could be all but eliminated by placing the last layer of wastes deeply enough in the cell. The plan is to ring the cells with excavated material, as well. If leachate is generated and pumped to the leachate holding pond and if there is enough of it to fill the pond or nearly to fill it, a storm might result in an overflow from the leachate holding pond that would drain eventually into Grant Pond. This danger, too, could be all but eliminated by operating the landfill so that the level of leachate in the holding pond always remained low enough, and by disposing of all leachate, if the facility generates any, off site, rather than "by landspreading on site." Jackson County's Exhibit No. 6. The same people who manage the landfill in eastern Jackson County would manage the landfill here proposed. No leachate has been generated at Jackson County's eastern landfill, but litter that can blow out of the cells at the eastern landfill does. If the same practices obtain at the new site, airborne litter that does not reach Grant Pond on the wing, may later be washed into the Pond by stormwater, even though the baffles would eliminate floatables in the water flowing out of the detention ponds. TWO AQUIFERS The parties are in agreement "that the leachate and or other pollutants will probably never reach the Floridan Aquifer." Petitioners' Closing Argument, p. 4. The Floridan aquifer is a limestone rock formation underlying the proposed site at depths varying between 30 and 130 feet, and separated by a layer of stiff clay from the overlying silts and sands. The stringers of saturated sands lying near the surface comprise a distinct, surficial aquifer that lies between five and twenty feet below ground over most of the site but crops out as Grant Pond on the northern edge of the property. No cell would be built within 200 feet of the highwater line of Grant Pond. The water table in the surficial aquifer, which yields potable water, is a subdued replica of the ground topography. Surface water from the southwest part of the proposed landfill site, where wells are closest, flows into Grant Pond. Water sometimes stands on the southeast part of the site, an area one witness described as boggy. A trailer stands on a parcel adjoining the property to the southeast with its near boundary 300 or 400 feet from the site proposed for the first working cell. No cell is to be dug within 500 feet of any existing or proved potable water well. The application contemplates monitoring wells. Groundwater in the Floridan aquifer flows south. Three wells to a depth of about 45 feet each are planned for south of the cells so that, in the unlikely event that pollution reached the Floridan aquifer, it could be promptly determined. There will also be a monitoring station in Grant Pond so the effect of stormwater runoff on water quality in the pond can be gauged. One well, 250 feet east of the west property boundary and 250 feet south of the north boundary, is planned for monitoring the surficial aquifer. TOXIC WASTES Toxic wastes are generated in Jackson County. Hundreds of drums with a little something still left in them are brought to the County's eastern landfill. No toxic wastes can lawfully be dumped at landfills like the one Jackson County proposes to build near Campbellton, but containers which once held toxic substances can lawfully be disposed of at such landfills, provided they have been rinsed out with water three times. Signs to this effect are to be posted. The landfill would have a single entrance. An attendant would be on duty during the landfill's hours of operation (8 to 5, five days a week), but would not be expected to have sampling equipment or to enforce the triple rinsing requirement, if past practice at the eastern landfill is any indication. When the landfill is not open, according to the applicant's engineer, green boxes will nevertheless be available for dumping. SCREENING Litter fences are planned only "if needed." A green belt 100 feet wide is proposed along the southern and the eastern perimeter of the property. "Appropriate trees and shrubs" are to be planted there, perhaps bamboo or oleander. SEPTAGE DISPOSAL PITS In a letter dated December 1, 1982, under the heading "septage disposal pits", C. G. Mauriello, the engineer who designed the proposed landfill, wrote DER's Wayne Hosid: This item was not shown on the original application but should be included. It has been recognized by the County that disposal of this type waste material should be handled at the new west site and therefore, provisions will be made for the disposal. Basically, a trench type operation similar to the East Site will be provided. The location of the disposal area will be to the south of the Future Holding Pond and north of the Salvage Area. Jackson County's Exhibit No. 6. A drawing prepared by the same person in July of 1982 shows a "septic tank/drainfield" southeast of the location described for the "septage disposal pits." DER's Exhibit No. 1. The permit DER proposes to issue contains numerous conditions, including the following: Construction of septage drying beds will be identical to those permitted under Permit No. 5032-22067 for Jackson East Sanitary Landfill as modified on July 20, 1981. Jackson County's Exhibit No. 9. Permit No. 5032-22067 was not made a part of the record in these proceedings. Incidentally, the word "septage" does not appear in Webster's Third New International Dictionary (1971). A septic tank or any similar system would differ significantly from the systems described by the witnesses who testified at hearing. Septic tanks eventually discharge their contents into surrounding soils, after treatment by anaerobic bacteria. Septic tanks cannot be sealed off by clay or anything else from the earth around them, if they are to function properly. Sooner or later discharge from any septic tank on site could be expected to enter the surficial aquifer and, ultimately, through the groundwater, Grant's Pond. Nothing in the evidence indicates how long it might take for any such effluent to reach the groundwater or leach into Grant Pond; or what its chemical composition might be. MORAL OBJECTION STATED Petitioners' witness Frederick L. Broxton, Sr. testified that, even conceding the absence of a scientific or legal basis for objection to the proposed project, it was immoral for the County Commission to choose a site so close to people's homes, when there was so much land available in that part of the county, where nobody lived. PROPOSED FINDINGS CONSIDERED All parties filed posthearing submissions which have been considered in preparation of the foregoing findings of fact. Respondent Department of Environmental Regulation filed proposed findings which have been adopted, in substance, for the most part. Where proposed findings have not been adopted, it is because they have been deemed immaterial, unsupported-by the weight of the evidence, subsidiary or cummulative.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That the Department of Environmental Regulation issue Jackson County a permit for construction of a landfill at the site proposed subject to the conditions (except condition No. 24) stated in the proposed permit, Jackson County's Exhibit No. 9, and subject to the following additional conditions: (a) any leachate generated shall be disposed of off site (b) the whole landfill shall be fenced, and the view from State Road 273 shall be obstructed (c) portable fences shall be placed around any cell in use (d) an additional monitoring well shall be placed between the well southeast of the site and the nearest cell and (e) no septic tank or "septage" disposal pits shall be built on site. DONE and ENTERED this 17th day of August, 1983, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of August, 1983. COPIES FURNISHED: Robert L. Travis, Jr., Esquire 229 East Washington Street Quincy, Florida 32351 J. Paul Griffith, Esquire P. O. Box 207 Marianna, Florida 32446 E. Gary Early, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (1) 7.05
# 1
CITY OF NAPLES vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-001569 (1979)
Division of Administrative Hearings, Florida Number: 79-001569 Latest Update: Dec. 27, 1979

Findings Of Fact As a part of its solid waste disposal program, the City of Naples operates a yard trash compost site adjacent to the Gordon River within the city limits. A fifteen (15) acre site has been leased from a private owner, and the lease requires that the City operate the site in compliance with permitting requirements. The site is intended to received only horticultural yard trash. The City picks up such trash in trucks, and delivers it to the site. Cells, or ditches, have been excavated at the site to a depth of approximately six (6) feet. The trash is deposited into the cells. The cells are excavated to a depth below the ground water level, so the trash is placed directly into the ground water. Although only horticultural yard trash is intended to be disposed of at the site, and although the City attempts to enforce this intention, household garbage including food waste frequently finds its way into the cells. The City has been utilizing this site in this manner for approximately fifteen (15) years, and for at least the past ten (10) years has operated under all required local and state permits. The City is presently operating the site in accordance with a permit issued by the Department of Environmental Regulation on December 31, 1976. The permit expires on January 1, 1980. Sometime in February, 1979, the Department first gave notice to the City that the yard trash compost site was not being operated in conformity with all applicable rules and regulations. Specifically the Department advised the City that the site violated the provisions of Rule 17-7.04(2)(a), Florida Administrative Code, because solid waste was deposited within 200 feet of a natural water body (the Gordon River) and Rule 17-7.04(2)(f), because solid waste was deposited in an area where the water table was less than five (5) feet below the normal ground surface. Rule 17-7.04(2)(f) was modified during the course of this variance application proceeding. The rule now requires that solid waste not be deposited directly into the ground water. The City's site neither conformed with the rule in effect in February, 1979, nor with the present modified rule. The Department and the City agreed that the City could continue to operate the site pending the completion of this proceeding, and, until all present cell excavations are filled. Yard trash compost sites such as that operated by the City do not involve as profound a threat to water quality as do more generalized solid waste disposal sites. Nonetheless placing of large quantities of yard trash at or in water bodies will cause infusion of large quantities of nutrients into the water body. The composting or breaking down of yard trash can take place under either aerobic or anaerobic conditions. Aerobic decomposition takes place where vegetation is exposed to oxygen. Anaerobic decomposition takes place where there is no oxygen. If vegetation is covered by water or soil it will not have oxygen. The materials will only partially decompose through a process called fermentation. Such material, when not fully decomposed, cannot be fully compacted nor reduced in volume as would happen with aerobic decomposition. The system utilized by the City of Naples therefore will result in a springy texture to the area. When decomposition takes place above ground, and vegetation is exposed to oxygen, the Vegetation can break down into its primary elements, resulting in a humus material which can be utilized to condition soil, and which will become part of the soil and stabilize the soil. The City's method of disposal introduces very concentrated amounts of organic substances into the ground water. There is thus a large increase in nitrogen and phosphates in the ground water. Placing such large quantities of organic material into the ground water effectively pollutes the ground water. There is a shallow water aquifer below the surface level at the trash compost site. Below this aquifer is a layer of sand, marl and rock which is not highly permeable. Below this layer lies a second aquifer which is an important source of drinking water in the area. Trash at the compost site under the City's present system is deposited directly into the upper aquifer. This water flows either into the Gordon River adjacent to the site, or more slowly permeates down into the lower aquifer. Placing the organic materials into the ground water thus constitutes a serious source of pollution either to the Gordon River, or to the lower aquifer, or to both. Certainly it serves to profoundly degrade the water quality of the ground water. The City has operated two (2) test wells adjacent to the site for the past eighteen (18) months. Results of samples taken from these test sites are inconclusive, and do not reveal that the City's disposal system has caused any pollution whatsoever. This does not mean, however, that no adverse impact could have been detected, or that none has taken place. The City's test wells were not placed so that they would intercept the flow of ground water from the site. Even if they had been so placed, testing has taken place only every six (6) months, and not in a manner so that any viable conclusions can be reached. The Department has recently installed test wells, and although data from them is not complete, it does reveal a definite flow of pollutants from the site to the test wells. Although the flow of ground water will serve to dilute the pollutants to some degree, it is inevitable that the ground water supply itself will be degraded, and that eventually either the waters of the Gordon River or of the lower aquifer will also be adversely affected. Under its present system the City estimates that it will be able to utilize the compost site for eight more years. The City has contended that operating the site as an above ground compost site would effectively cut in half the time period over which the site could be utilized and would increase the cost of maintaining the site by requiring additional equipment, and eventually requiring additional equipment for the transporting of yard trash to a remote site. These contentions are not supported by the evidence. In the first place the City could save money in operating the site as an above ground composting site because it would not be necessary to make excavations. Furthermore, above ground composting of the materials would result in usable compost which could be sold as land fill. This could constitute a source of revenue, and also open the site for additional usage.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED: That a final order be entered granting the variance application filed by the City of Naples with respect to its request to be relieved from the requirements of Rule 17-7.04(2)(a), with conditions imposed as set out in the Department's notice dated June 21, 1979 (DER Exhibit 4). That a final order be entered denying the exemption request filed by the City of Naples with respect to the requirements of Rule 17-7.04(2)(f). RECOMMENDED this 28th day of November, 1979, in Tallahassee, Florida. STEVEN PFEIFFER Assistant Director Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: David W. Rynders City Attorney City of Naples 735 8th Street South Naples, Florida 33940 Ray Allen Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (5) 120.54120.57403.201403.7047.04
# 2
S. A. ALFORD, III, ET AL. vs. BAY COUNTY BOARD OF COUNTY COMMISSIONERS AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 80-001123 (1980)
Division of Administrative Hearings, Florida Number: 80-001123 Latest Update: Dec. 24, 1980

Findings Of Fact Bay County's application to construct a sanitary landfill comprising nearly 80 acres located at the north end of Bay County abutting Washington County near the intersection of S.R. 20 and S.R. 77 was initially submitted to the Department of Environmental Regulation (DER) in November, 1979 (Exhibit 1). The site is surrounded by 400 feet of pine woods which buffer the site from all roads and residences . There are no residences within several hundred yards of the proposed site and the nearest natural body of water is over one-fourth mile from the site. The noise generated by the operation of the landfill will be similar to the noise generated on S.R. 20 and S.R. 77 by passing vehicles. Following conferences between representatives of Bay County and DER and several revisions of the application of May 16, 1980 DER issued its notice of intent to grant the applied-for permit (Exhibit 10) and this proceeding was initiated by Petitioners. The site is located in an area of predominately "Lakeland series" sands which provides little barrier to the percolation of surface or ground waters into the Floridan Aquifer. The site is one of the highest in Bay County and the ground water table is located about 45 feet below the surface in this area. The Floridan aquifer lies some 100 feet below the proposed site and is in direct contract with the ground water table. Accordingly, contamination of the ground water by the proposed landfill would enter into the Floridan Aquifer and degrade the water quality of this aquifer. Additionally escaping leachate could contaminate and degrade the waters of the lakes in the general vicinity of the proposed site. As initially presented the application was denied by DER and recommended for denial by the other state agencies involved, viz. Florida Game and Freshwater Fish Commission and the Northwest Florida Water Management District. The reason for disapproval was that, absent some impervious surface between the aquifer and lakes in the vicinity could occur and was likely. Not only is the site located in a recharge area to the Floridan Aquifer but also in a karst area, in which the topography is marked by sinkholes resulting from the collapse of cavernous limestone under the ground. While the possibility exists that a sinkhole could develop under the proposed landfill this is no more likely than that a sinkhole will develop anywhere else in the northern half of Bay County. As finally proposed the site will be developed into cells some 400' x 500' x 28' deep which are expected to be filled in about six months, covered with a a clayey soil and vegetation replanted over the cell. To keep leachate from escaping to the lakes or aquifer the cells will be lined with a polyvinyl chloride (PVC) liner is 20 mils thick manufactured by B. F. Goodrich. If the liner functions as proposed there will be no escape of leachate and hence no degradation of the waters. Petitioners contend that reasonable assurances have not been given that the PVC liner will adequately perform this function and this was the only real issue presented at the hearing. PVC liners for landfills have been in use for only bout 10 years. However, numerous tests have been conducted and, projecting the deterioration of the PVC observed during the test period to the estimated life of the landfill, leads to an expected liner life well beyond the life of leachate production in the landfill. To give PVC the flexibility and elasticity necessary to lay it over uneven surfaces in sheets, plasticizers are added to the PVC during the manufacturing process. These plasticizers will be released from the PVC if exposed to sunlight for an extended period. However, as proposed for use here, even if the liner was exposed to sunlight for the entire six months the cell will be open, or even for one year, no significant loss of plasticizer will result. Once the cell has been closed, no further dynamic stresses will be placed on the liner. Accordingly, even if the liner lost all of its plasticizer and thereby lost its elasticity and flexibility, it would remain impervious and prevent the pasage of leachate through the liner. To protect the liner from solid waste, trash, and equipment used in the cell to compress the solid waste, the liner will be covered with two feet of sand before any solid waste is placed in the cell. Each night the solid waste dumped that day will be covered with six inches of on-site earth material to deter flies, odors, etc. The two feet of sand cover will protect the liner from puncture by solid waste or equipment. The liner will be placed on a tight slope with a sump provided near the low end of each cell from whence leachate will be pumped from the cell and treated, if necessary. Additionally, vents will be installed to exhaust gases from the cell once it is closed. Monitoring wells will be placed around the land fill to detect if leachate is escaping from the site. These wells would allow detection of escaping leachate before it could progress to the natural water bodies in the general vicinity. The three to one slope proposed for the sides of the landfill will result in some movement of free sand resting on the liner along the sides and could bare the liner. To insure there will be a minimum of two feet of soil between the fill material and the liner the cell will not be filled completely to the side of the liner to fill in the space left between the garbage and the side wall each day when the material dumped that day is covered. Hazardous wastes will not be allowed at the site. The site will be enclosed and have an attendant on duty at all times it is opened to receive solid waste. Public access will be restricted and the attendant on duty will monitor the waste dumped in the cell. Household wastes will be accepted and these may include small quantities of paints, insecticides and other material that in large quantities would be considered hazardous. The sand over the liner, the pumping out of the leachate and overall operation of the landfill are adequate to protect against these small amounts of hazardous materials. Bay County proposes to use an existing disposal site to dump tree and hedge trimmings and may provide a place to dump this woody trash at the proposed site other than in the cells. This will increase the capacity of the cells for solid waste and diminish the possibility of damage to the liner by woody products. The only credible evidence submitted regarding the availability of alternate sited for the proposed landfill was that other areas further south were investigated and were unacceptable because the groundwater table was above the bottom of the proposed cells. This would result in dumping solid waster directly into the water table, and is unaceptable. Petitioner's principal contention is that there has been insufficient experience with PVC liners and the tests that have been conducted were not sufficiently rigorous or extensive to provide assurances that leachate would no escape from the site and contaminate the waters of the State. Petitioners also contend that joining of sections of PVC in field, which will be necessary to cover that bottom of the cells (because a liner large enough to cover the bottom of one cell would be too large and heavy to handle), would also create unacceptable risks in the making of these "field seams". Bay County has arranged for the manufacturer of the PVC to provide personnel to supervise the "field seaming" of the sections of the PVC. These seams do not need to be wrinkle-free and no particular problem with respect to joining sections of PVC liner so as to make it watertight was shown. The tests conducted by the Environmental Protection Agency on PVC liners have been ongoing for nearly ten years. None of these tests to date show any reason to question the effectiveness of a PVC liner properly installed to provide an impermeable barrier to leachate in a sanitary landfill. Petitioners also object to the use of cover material proposed by Bay County when a cell is closed. The soil analysis submitted with the application for the cover proposed does not have a high clay content and is more permeable than would be desired. At the hearing, Bay County officials testified they would use a more impermeable soil to cover the cells. Failure to do so would increase the amount of water from rainfall that would penetrate the cell, thereby increasing the quantity of leachate to be pumped from the sump. This would increase the maintenance cost of the landfill to the point it would be uneconomical not to put a water-repellant cover on the cell when it is closed. No evidence was presented that the formation of additional leachate would increase the risk of leachate escaping from the cell.

Conclusions Having considered the Recommended Order, including the Findings of Fact and Conclusions of Law, Petitioners' Exceptions, and Respondent's Response to Petitioners' Exceptions, it is, therefore: ORDERED that the Hearing Officer's Findings of Fact are adopted; his Conclusions of Law and Recommended Order, to the extent that they are consistent with this Final Order, are adopted; and ORDERED that the permit reflected in the Notice of Intent issued by the Department on May 16, 1980, be issued with the following additional conditions: The applicant shall notify the Department at least on week in advance of when the P.V.C. is to be installed and allow for on-site inspection of its installation by Department personnel. No operation permit will be issued unless the applicant has shown reasonable assurances that the P.V.C. has been properly installed and all other applicable rules of the Department and the applicable Florida Statutes have been complied with. Any operation permit issued shall be for only one cell and no permit for subsequent cells shall be approved in accordance with 2. above without a showing of proper operation for the previous cells. The final cover material for each cell shall be clay, substantially clay or other impermeable material. Any DER permits for this site shall only be valid until 24 months from the date of this order. ORDERED that the country shall submit within thirty days a plan with schedule by which this landfill site will be phased out in 24 months, which shall include selection of alternate acceptable sites or the implementation of a resource recovery program in accordance with 17-7, Part II, Florida Administrative Code. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 22nd day of December, 1980. JACOB D. VARN, Secretary Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of December, 1980. CERTIFICATE OF SERVICE I HEREBY CERTIFY that a true copy of the foregoing "Final Order" has been furnished by United States Mail to Kenneth F. Hoffman, Esquire, Oertel and Laramore, P.A., 646 Lewis State Bank Building, Tallahassee, Florida 32302, Les W. Burke, Esquire, County Attorney, Bay County, Post Office Box 1818, Panama City, Florida 32401, and K.N. Ayers, Hearing Officer, Division of Administrative Hearings, Collins Building, Room 101, Tallahassee, Florida 32301, this 22nd day of December, 1980. DOUGLAS H. MacLAUGHLIN Assistant General Counsel State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 (904) 488-9730

Florida Laws (3) 120.57403.7077.05
# 3
SUNSOUTH BANK vs DEPARTMENT OF HEALTH, 13-002795 (2013)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 23, 2013 Number: 13-002795 Latest Update: Apr. 10, 2014

The Issue Whether Petitioner’s application for a variance to permit an onsite treatment and disposal system should be approved.

Findings Of Fact The lot of land for which the Bank seeks a variance for an onsite sewage treatment and disposal system is located at 341 Compass Lake Drive in Jackson County, Florida. The lot is approximately 40 feet wide and 300 feet deep, with approximately 40 feet of frontage on Compass Lake. Prior to its severance in 2010, the lot was part of a larger parcel of land with an address of 343 Compass Drive in Jackson County. The larger parcel was owned by Charles Paulk and had substantial improvements consisting of a house, boathouse, and dock. In 2004, Mr. Paulk borrowed money from the Bank and gave the Bank a mortgage lien on the entire larger parcel to secure the loan. At some point, a survey was prepared which subdivided the larger parcel into two lots -- the first containing the substantial improvements, and the other consisting of the approximately 40-foot by 300-foot lot at issue, which is .28 acres in size, with no improvements. There is no indication that the survey was ever recorded in the public records. Later, in 2010, Mr. Paulk decided to sell the lot with the substantial improvements for $330,000. Because the Bank had a lien on the entire larger parcel, Mr. Paulk requested that the Bank release its lien on the lot with the substantial improvements. The Bank agreed to release its lien on the lot with substantial improvements and, after receiving what the Bank felt was a “sufficient pay-down” on the loan, shifted its lien to the smaller, unimproved lot that is at issue in this case. The sale and release of lien transaction “substantially reduced the loan versus the collateral value” that the Bank previously had. According to the Bank’s Senior Vice President, James Goodson, after the sale transaction, there was “not a lot of money left on the loan ” Mr. Goodson testified that, at the time that the Bank agreed to release its lien on the substantially improved lot and shift its lien to the remaining unimproved lot, it was unaware that a variance would be required for an onsite sewage treatment and disposal system (septic tank) on the unimproved lot. The facts as outlined above, however, demonstrate that the Bank was an active participant and beneficiary of the transaction that ultimately resulted in the creation of the two lots, one of which was the approximately 40-foot by 300-foot unimproved lot at issue in this case. In 2012, Mr. Paulk experienced financial problems and was having difficulty paying back the loan to the Bank secured by the unimproved lot. Because it was easier than foreclosure, the Bank agreed to take a deed to the unimproved lot in lieu of foreclosure.1/ At the time of the Bank’s release of lien in 2010, as well as at the time of the deed in lieu of foreclosure, the 40- foot by 300-foot lot size of the unimproved lot was too small to meet the statutory requirements for a septic permit. Mr. Goodson testified that, at the time that the Bank accepted the deed in lieu of foreclosure, the Bank was aware that the lot was too small and would need a variance for a septic tank. He did not explain, however, why the Bank had earlier been unaware of the need for a variance when it agreed to release its lien on the substantially improved lot in 2010. After the Bank acquired title to the unimproved lot, a third party offered to purchase it on the condition that the Bank could obtain a permit. The Bank went to Jackson County to request a permit, knowing that its request would be denied because the lot size was insufficient for a septic tank without a variance. Nevertheless, the Bank believed that it would qualify for a variance on hardship grounds because it did not “intentionally” create the hardship. The Bank commenced the permitting process by submitting an application with the Jackson County Health Department on October 4, 2012. The County denied the application on the grounds that the lot was deficient in width and total area. Next, the Bank submitted a request to the Department for a variance. The request was considered by the Department’s Variance Review and Advisory Committee (Committee) on December 6, 2012. The Committee has only recommending authority to the State Health Officer. In a four to three vote, the Committee recommended approval of a variance. The members voting against a recommendation for approval were representatives of the State Health Office, the Department of Environmental Protection, and the County Health Department. Eight objections from adjacent property owners were provided to the Committee’s review and consideration. After considering the facts, including the decision of the County Health Department, objections filed by adjacent property owners, actions taken by the Bank, and the recommendations of all the members of the Committee, Gerald Briggs, Bureau Chief for Onsite Sewage Programs for the Department of Health, made the Department’s preliminary decision that the Bank’s variance request should be denied, concluding, among other things, that “[a]ny perceived hardship that [the Bank] might experience as a result of the obligation to meet established standards comes about as a direct result of your own proposed action.” Likewise, considering the facts and evidence as presented in this case, the undersigned finds, as a matter of fact, that the Bank intentionally participated in and benefitted from the transaction that resulted in the hardship posed by the small lot size that it now owns and for which it seeks a variance.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Health enter a Final Order denying SunSouth Bank’s application for a variance. DONE AND ENTERED this 21st day of March, 2014, in Tallahassee, Leon County, Florida. S JAMES H. PETERSON, III Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of March, 2014.

Florida Laws (5) 120.569120.57120.68381.0061381.0065
# 4
CITY OF BARTOW vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 78-001139RX (1978)
Division of Administrative Hearings, Florida Number: 78-001139RX Latest Update: Sep. 14, 1978

The Issue The issue presented for determination in this proceeding is whether the wasteload allocations set forth in respondent's interoffice memorandum dated September 8, 1977, constitute a rule subject to the procedural requirements of the Administrative Procedure Act, Chapter 120, Florida Statutes.

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following facts are found: The petitioner, a municipal corporation, applied to the respondent for renewal of its permit to operate a sewage treatment plant. The respondent gave notice of its intent to deny said application on the ground that petitioner had not met the wasteload allocations established for the upper part of the Peace River Basin. A petition for a hearing on this denial was filed by petitioner pursuant to the provisions of Florida Statutes, 120.57(1), and a hearing was originally scheduled for May 11, 1978. At the commencement of this hearing, it became apparent that petitioner was also alleging that the wasteload allocations set forth in an interoffice memorandum dated September 8, 1977, constituted a rule within the meaning of Chapter 120, Florida Statutes, and therefore must be adopted pursuant to the provisions of said chapter. The respondent not being prepared to meet this allegation and the petitioner not having filed a petition pursuant to the provisions of Section 120.56, the scheduled hearing was continued and petitioner was granted leave to file a petition pursuant to Section 120.56 challenging the validity of the wasteload allocations as an invalid rule. Petitioner properly filed its petition for an administrative determination of the validity of a rule and the two petitions were consolidated for hearing purposes. The "rule" being challenged herein contains revised wasteload allocations for four municipalities in Polk and Hardee Counties. These four include Bartow, Ft. Meade, Bowling Green and Wauchula, each of which discharges effluent into the Upper Peace River Basin. As noted above, these allocations are set forth in an interoffice memorandum dated September 8, 1977, and were not adopted pursuant to the rulemaking provisions of Chapter 120, Florida Statutes. Wasteload allocations are derived from mathematical calculations fed into a scientific model. They are based upon information pertaining to the treatment plant, the type of effluent, the physical, chemical and biological characteristics of the receiving waters and the number and nature of other discharges to the receiving waters. In developing said allocations, the respondent relies upon information received from the applicant, as well as existing water quality data from the Environmental Protection Agency, United States Geological data, local programs and university studies. The purpose of developing wasteload allocations is to determine the chemical effect of the discharge upon the receiving body of water and to determine whether a certain volume of effluent treated to a specified degree will depress water quality below the standard established for a particular class of water. Wasteload allocations are calculated by the respondent for each individual discharger to determine whether a reduction in water quality will occur. When an application for a discharge permit is made to respondent, allocations for several dischargers in close proximity affecting the same portion of a body of water may be calculated at the same time, as was done in the September 8th memorandum. However, the other individual allocations become effective and applicable only when those dischargers seek a permit from the respondent. At that time, the allocation is revisited and recalculated based upon the most recent, available information and data. The wasteload allocations have applicability only when a facility seeks a permit to discharge effluents into surfaced waters. In the State of Florida, there are approximately 1,300 domestic and municipal sewage treatment plants and 230 industrial dischargers. A uniform wasteload allocation for 1,530 dischargers would be impossible and meaningless because each has its own unique characteristics based upon the type and method of discharge and the nature of the receiving body of water. Accordingly, the wasteload allocations are established by respondent on a case by case basis in the permitting process. Approximately 1.6 million dollars in capital expenditures will be necessitated in order for petitioner to comply with the wasteload allocations established by the respondent. There would also be increases in operating and management costs for new capital improvements. Alternative methods of sewage treatment may be undertaken by the petitioner.

Florida Laws (6) 120.52120.54120.56120.57403.051403.061
# 5
FRIENDS OF PERDIDO BAY, INC., AND JAMES LANE vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 08-006033RX (2008)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida Dec. 05, 2008 Number: 08-006033RX Latest Update: Oct. 01, 2009

The Issue The issue for determination in this case is whether Florida Administrative Code Rule 62-302.300(6) is an invalid exercise of delegated legislative authority because the rule is vague, fails to establish adequate standards for agency decisions, or vests unbridled discretion in the agency.

Findings Of Fact The Parties The Department is the state agency authorized under Chapter 403, Florida Statutes, to regulate discharges of industrial wastewater to waters of the state. Under a delegation from the United States Environmental Protection Agency, the Department administers the National Pollution Discharge Elimination (NPDES) permitting program in Florida. The Department promulgated the rules in Florida Administrative Code Title 62 that are applicable to the permitting of wastewater discharges. FOPB is a non-profit Alabama corporation established in 1988 whose members are interested in protecting the water quality and natural resources of Perdido Bay. FOPB has approximately 450 members. About 90 percent of the members own property adjacent to Perdido Bay. James Lane is the president of FOPB. Jacqueline Lane and James Lane live on property adjacent to Perdido Bay. IP owns and operates a paper mill in Cantonment, Escambia County, Florida. IP is the applicant for the Department authorizations that are the subject of DOAH Case Nos. 08-3922 and 08-3923. Background When this rule challenge was filed, DOAH Cases Nos. 08-3922 and 08-3923 (the permit cases) involved challenges by these same Petitioners to four Department authorizations for IP: an NPDES permit, a Consent Order, an approved exemption for the experimental use of wetlands pursuant to Florida Administrative Code Rule 62-660.300, and a waiver related to the experimental use of wetlands. IP later withdrew its request for the experimental use of wetlands exemption and the related waiver. Petitioners were ordered to show cause why their claim regarding the invalidity of Florida Administrative Code Rule 62- 660.300 was not rendered moot by IP’s withdrawal of its request for the exemption. Subsequently, the challenge to the validity of Florida Administrative Code Rule 62-660.300 was dismissed as moot. At the commencement of the final hearing on June 22, 2009, FOPB and James Lane announced that they were withdrawing their rule challenges except with respect to Florida Administrative Code Rule 62-302.300(6), and that the only legal ground being asserted for the invalidity of the rule is that it is vague and vests unbridled authority in the Department. Petitioners’Standing Jacqueline Lane, James Lane and a substantial number of the members of FOPB swim, boat, and make other uses of Perdido Bay. Perdido Bay would be affected by IP's wastewater effluent. The challenged rule was applied by the Department to determine that IP's proposed industrial wastewater discharge was in the public interest. The Challenged Rule Florida Administrative Code Rule 62-302.300, is entitled "Findings, Intent, and Antidegradation Policy for Surface Water Quality." Subsection (6) of the rule states: Public interest shall not be construed to mean only those activities conducted solely to provide facilities or benefits to the general public. Private activities conducted for private purposes may also be in the public interest. Most of the permits that are issued by the Department are issued to private entities whose primary purposes are personal uses or the production of private incomes and profits, rather than solely to provide facilities or benefits to the general public.

Florida Laws (5) 120.52120.56120.68403.067403.088 Florida Administrative Code (4) 62-302.30062-302.70062-4.24262-660.300
# 6
HENDRY CORPORATION vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 92-002312 (1992)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Apr. 14, 1992 Number: 92-002312 Latest Update: Aug. 10, 1993

Findings Of Fact The Department (DER) is the regulatory agency of Florida charged with the duty and authority to administer and enforce Chapter 403 and Sections 376.30-376.319, Florida Statutes, and rules and regulations promulgated thereunder. Hendry is a Florida corporation that has been conducting business in excess of 60 years. The two main aspects of its business are the dredging operation and the shipyard. Hendry's site can be loosely described as an industrial site. The shipyard division performs approximately one-half its work for governmental entities, particularly the U.S. Coast Guard, which operations are largely ship refurbishing. Hendry has a Coast Guard certificate enabling it to receive mixtures containing oil and oily water waste. A significant portion of Hendry's ship refurbishing work involves repairing/replacing steel on ships which has deteriorated due to salt water exposure. That work frequently requires cutting, welding and burning. Prior to commencing the refurbrushing work, the ships must be certified as safe. In certifying a ship as being safe, the bilge area is pumped of used oil or waste oil which collects in standing waste water and oil. Also, before that works commences, the ship is defueled. Currently, Hendry's practice is to subcontract the pumping of waste oil from the ships bilge, which waste oil is pumped directly into the tanker truck of the subcontractor. Hendry no longer pumps or stores waste oil on site. In the past, the waste oil and water from the ship's bilge was pumped from the ship through a pipeline from the dry dock across the property to a 10,000 gallon above-ground storage tank. During December 1987, the U.S. Coast Guard observed a fuel spill on the water at Petitioner's facility. Based on that observation, Respondent conducted site inspections of Petitioner's facility during March and April 1988. The fuel spill was occasioned by Petitioner's refurbishment of a tuna boat at its site. Petitioner subsequently received a warning notice regarding alleged violations in its petroleum storage tanks and contamination. The transfer pipeline is of steel construction. Between 1980 and 1984, the pipeline leaked. In 1984, the pipeline was rerun with PVC line and in 1986, it was refitted with 4 inch steel pipe. The 10,000 gallon above-ground tank is located in Area 1. The removal of waste oil occasionally resulted in accidental spills. After 1985, a smaller, above-ground tank was installed adjacent to the 10,000 gallon tank to provide a storage tank for draining off water from the 10,000 gallon tank. The small tank was used to receive only water drained from the 10,000 gallon tank. Prior to installation of the small tank, a retention pond was used to drain water from the 10,000 gallon tank. The retention pond had a 2 foot berm with a visqueen liner. In October 1988, Hendry submitted an EDI Program Notification Application, a prerequisite for EDI reimbursement eligibility, under the program for costs associated with cleanup of certain petroleum contamination. In May 1989, Hendry submitted a document entitled Preliminary Contamination Assessment III Specific Areas--Task IV Rattlesnake Terminal Facility--Westshore Boulevard, Hillsborough County prepared by Mortensen Engineering, Inc. That document included reports of analysis of oil and groundwater samples taken from the site in January, March and April 1989, demonstrating extensive contamination of soil and groundwater including "free product" in monitoring wells MW-2, MW-4 and MW-4A. By letter dated November 9, 1989, the Department informed Hendry of its determination that the facility had been denied EDI reimbursement based on specific enumerated findings. Hendry entered into a stipulation with the Department on October 16, 1990, "regarding the conduct of this case and the basis for denial. " Attached to the stipulation is a sketch of the facility grounds showing a rough division of the area into four separate areas. Area 1 has two waste tanks. One was a large 10,000 gallon closed tank approximately 20 feet high and 12 feet in diameter; the other contained a volume of approximately 1,500-2,000 gallons and was an open tank. Petitioner's practice was to pump bilge in the dry dock area, located west of "Area 2" and direct the waste through underground pipes to the 10,000 gallon tank. The smaller tank was used to "bleed" water from the larger tank. Bilge waste is approximately two-thirds water. Area 2 was the location of Hendry's diesel tank farm. In the stipulation, the Department agreed to withdraw two of the seven specific grounds for the denial, namely denial of site access and failure to report discharges. Likewise, Hendry agreed to withdraw "Area 4" from its application for EDI eligibility. In the stipulation, Hendry was informed of a then recent amendment to Section 376.3071(9), which offered certain applicants who had been earlier determined ineligible for participation in the EDI program, standards and procedures for obtaining reconsideration of eligibility. The amendment required the facility to come into compliance, certify that compliance and request reconsideration prior to March 31, 1991. Additionally, compliance was to be verified by a Department inspection. Pursuant to paragraph 5(b) of the stipulation, these standards and procedures were specifically to be applied to Areas 2 and 3 at the facility. Hendry did not make a written request for reconsideration of the denial of eligibility with respect to Areas 2 and 3 on or before March 31, 1991 or at anytime subsequently. Hendry also did not come into compliance with the underground or above-ground storage tanks system regulations on or before March 31, 1991 in that Hendry failed to register a 560-gallon above-ground diesel storage tank which was onsite on that date as required by Rule 17-762.400, Florida Administrative Code. Hendry also failed to notify the Department of the Hillsborough County Environmental Protection Commission (HCEPC), as the administrator of a designated local program at least thirty days prior to closure of the storage tank system, pursuant to Subsection 376.3073, Florida Statutes. These determinations were made on April 1, 1991 by Hector Diaz, inspector in the HCEPC tanks program. Hendry submitted a registration form for the 560-gallon tank on November 18, 1991, which was of course subsequent to the March 31, 1991 deadline. Hendry stored petroleum products and waste material including petroleum constituents in the above-ground tanks until approximately March 25, 1991 when it initiated tank removal. Hendry's above-ground storage tanks, which were in use at its facility for approximately three years after extensive soil contamination was documented, were without secondary containment. In November 1991, Hendry submitted a document entitled Supplemental Preliminary Contamination Assessment Report, prepared by Keifer-Block Environmental Services, Inc. (Supplemental PCAR). The stated purpose of the study was solely to determine whether hazardous constituents were present in groundwater in Areas 2 and 3. The report included laboratory analysis of groundwater samples taken from the site in August 1991 including monitoring wells located in Area 3. The results of these analysis reflect that Area 3 is contaminated solely with heavy metals, lead and chromium. No petroleum hydrocarbon contamination was detected in Area 3. In the area adjacent to Area 2, seven of eight monitoring wells show chromium or lead contamination. Hendry had, and continues to have, a practice of removing paint from vessels by blasting them with a gritty material known as "black beauty." This practice takes place in the dry dock area near Areas 2 and 3. The waste blast grit/paint chip mixture is vacuumed or shoveled into wheelbarrels or a frontend loader and dumped into an open pile. Occasionally, the waste blast grit/paint mixture is blown about or spilled. Waste "black beauty" has been observed scattered on the ground throughout the facility. Paints sometime contain heavy metals, specifically, lead and chromium. The concentrations and distribution of lead and chromium contamination at the site are consistent with Hendry's long-standing practice of grit-- blasting paint from ships and other vessels and allowing the metal-contaminated paint and waste mixture to fall to the ground. Areas 2 and 3 are contaminated with substances other than petroleum or petroleum products, namely heavy metals. Costs associated with cleanup of lead and chromium are not reimburseable under the EDI program. Paragraph 5(c) of the stipulation allowed Hendry an opportunity to establish eligibility for Area 1 by providing information regarding operating practices at two above-ground storage tanks and a retention pond in that area demonstrating that contamination in that area is predominantly from leaks or unintentional spills of petroleum products from the tanks in that area. Hendry did not provide the required information. On January 27, 1992, Hendry submitted to the Department an affidavit executed by its principal, Aaron Hendry, which Hendry contends fulfills the requirements of paragraph 5(c) of the stipulation. Hendry, the principal who executed the affidavit, is an affiant with a legal and financial interest in the outcome of the EDI eligibility determination. The executed affidavit did not contain specific information with respect to "operating practices at the tanks and retention ponds as required by the stipulation." Specifically, the affidavit is silent as to: What the tanks were made of; When, how and by whom they were installed; What piping, leak detection or overfill protection was associated with them; What repairs or alterations had been made to them; What inventory reconciliation methods were used; Where the materials came from which was put into the tanks; In what manner, how often, and by whom material was put into the tanks; In what manner, how often, and by whom material was removed from the tanks; Disposition of material removed from the tanks; When, how, by whom and why the retention pond was dug; How and for what period of time the retention pond was used; How, often and by whom inspections of the tanks were conducted; When and how leaks occurred and were discovered at the tanks; When and how spills occurred and were discovered at the tanks; What records, including reports to state or local agencies, insurance claims, newspaper accounts, and so forth were kept with respect to leaks or spills at the tanks; What cleanup efforts were made at the time of any leaks or spills; Documentation related to registration of the tanks with state or local agencies; and Documentation with respect to any removal of the tanks, including any description of the condition of the tanks when, or if, removed. For years, the facility's retention pit was used as a "waste pit" namely, a rectangular hole in the ground, approximately 30 feet by 120 feet by 3 feet, for direct discharge of bilge waste piped from vessels at the dry dock area to the waste pit, prior to installation of the storage tank systems. After installation of the large tank in Area 1, the retention pit was used to bleed water from the bilge tank. In the past, the Department has denied eligibility to facilities where a retention pond was used for disposal of petroleum related waste and cleanup of contamination resulting from use of a retention pond. Hendry's affidavit nor other documentation submitted to the Department prior to the EDI redetermination or at hearing establishes that the bilge waste taken from the storage tanks was "a liquid fuel commodity" or recycled into such a commodity. By letter dated June 9, 1992, the Department notified Hendry that reconsideration of its EDI eligibility request for Areas 2 and 3 was denied and that the affidavit of Aaron Hendry submitted with respect to Area 1 did not satisfy the requirements of the stipulation. Thereafter, Hendry challenged the Department's denial of reconsideration and EDI eligibility which joins the issue for this proceeding. The hazardous waste allegation discovered during an inspection of Hendry's facility on April 14, 1988, resulted in a consent order which was entered as a final order of the Department on November 21, 1990. The consent order allowed Hendry an opportunity to demonstrate that not all areas at the facility were hazardous waste disposal areas and, thus, not all areas would be subject to closure and cleanup under the permitting requirements of Subsection 403.722, Florida Statutes and the remediation standards set forth in Chapter 17-730, Florida Administrative Code. To establish appropriate remediation standards and procedures which would be applicable to various areas, Hendry was required to prepare a property diagram designating areas at the property exhibiting any of the following types of contamination: Areas contaminated solely by petroleum or petroleum products or used oil which is not hazardous waste; Areas contaminated by materials which are not hazardous waste; Areas contaminated by the past or present disposal of hazardous waste. The consent order allows contamination assessment and remediation pursuant to the standards and procedures set forth in Chapter 17-770, Florida Administrative Code, for areas contaminated solely by petroleum or petroleum products. (Petitioner's Exhibit 5, paragraph 11.) The consent order requires contamination assessment and remediation pursuant to the Department's corrective action and groundwater contamination cases for all areas at the facility contaminated by used oil which is not hazardous waste or by hazardous material. (Petitioner's Exhibit 5, paragraph 12.) The consent order requires contamination assessment and remediation pursuant to a closure permit with a contingent post-closure plan to close the areas at the facility contaminated by the disposal of hazardous waste. In response to the consent order to delineate areas on the property exhibiting various types of contamination, Hendry submitted the supplemental PCAR. By letter dated March 19, 1992, the Department responded to the supplemental PCAR with a determination that: Area 1 can be assessed and remediated through the standards set forth in Chapter 17-770, Florida Administrative Code. Contamination in Areas 2 and 3 includes heavy metals, which are hazardous materials. Thus, Areas 2 and 3 should be assessed and remediated through the corrective action process for groundwater contamination cases. A hazardous waste facility closure permit application should be submitted for assessment and remediation of Area 4, which, because of the presence of Dichloroethylene, a hazardous substance and chlorinated solvent, should be expanded to include the location of monitoring well MW KBMW-2. Hendry had a practice of cleaning electrical motors by placing such motors on the ground outside the electrical repair shop near Area 4. The motors were sprayed with Trichloroethylene, a waste solvent, which was allowed to runoff into the soil. At the time of this practice, the intention was to leave the solvent contamination unchecked. The Department, pursuant to directives from the United States Environmental Protection Agency (EPA), characterizes the disposition of hazardous waste to the environment as a result of intentional, ongoing industrial practices as "disposal of hazardous waste" within the meaning of Subsection 475.703(21), Florida Statutes and 40 CFR 260.10. The consent order allowed Hendry an opportunity to challenge the Department's determination with respect to delineation of the various areas by filing a petition per paragraph 21 of the order for formal administrative hearings. Hendry filed its petition with respect to the March 19, 1992 letter, which petition is the subject of DOAH Case No. 92-2312.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that: Respondent, Department of Environmental Regulation, issue a Final Order in these consolidated cases concluding that 1) the contamination areas at issue herein are not eligible for EDI reimbursement under Subsections 376.3071(9) and (12), Florida Statutes; 2) that Petitioner cleanup the contamination in Areas 1, 2 and 3 under the guidance document entitled "Corrective Actions for Groundwater Contamination Cases"; and 3) that Area 4 be expanded to include the location of monitoring well MW KBMW-2 and closed through a hazardous waste closure/post closure permit application process. DONE AND ENTERED this 26th day of April, 1993, in Tallahassee, Leon County, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 1993. APPENDIX Rulings on Petitioner's proposed findings of fact: Paragraph 14, partially adopted in Paragraph 13, Recommended Order. Paragraph 19, rejected, contrary to the greater weight of evidence and speculative. Paragraph 20, rejected, unnecessary. Paragraph 21, rejected, contrary to the greater weight of evidence, Paragraphs 24-28, Recommended Order. Paragraph 22, partially adopted, Paragraphs 13 and 14, Recommended Order. Paragraph 23, partially adopted, Paragraph 15, Recommended Order. Paragraph 29, partially adopted, Paragraph 18, Recommended Order. Paragraphs 31, 32, 35, 48, 49, 51, 52, 60, 62 and 73 rejected, unnecessary. Paragraph 33, adopted in part, Paragraph 23, Recommended Order. Paragraph 38, adopted in part, Paragraph 23, Recommended Order. Paragraph 41, rejected, contrary to the greater weight of evidence and the two cases cited at hearing where Respondent exercises his discretion are distinguishable from Petitioner's failure to timely apply. Paragraph 43, rejected, unnecessary and/or argument. Paragraph 45, rejected, contrary to the greater weight of evidence. Paragraph 50, rejected, contrary to the greater weight of evidence, Paragraphs 37-39, Recommended Order. Paragraph 54, rejected, not probative. Paragraph 55, rejected, not probative. Paragraphs 56 and 57, rejected, contrary to the greater weight of evidence, Paragraphs 30 and 31, Recommended Order. Paragraphs 58 and 59, rejected, contrary to the greater weight of evidence, Paragraphs 23 and 24, Recommended Order. Paragraph 61, rejected, speculative and unnecessary. Paragraph 63, rejected, speculative. Paragraph 67, rejected, not probative. Paragraph 68, rejected, contrary to the greater weight of evidence, Paragraphs 30 and 31, Recommended Order. Paragraph 69, rejected, not probative. Paragraph 70, adopted in part, Paragraph 23, Recommended Order. Paragraph 72, rejected, irrelevant and not necessary to the issues posed. Paragraph 74, rejected, contrary to the greater weight of evidence and unnecessary. Paragraph 75, rejected, contrary to the greater weight of evidence, Paragraph 53, Recommended Order. Paragraph 76, rejected, contrary to the greater weight of evidence, Paragraph 53, Recommended Order. Paragraph 77, rejected, contrary to the greater weight of evidence, Paragraph 53, Recommended Order. Paragraphs 78 and 79, rejected, irrelevant and unnecessary. Paragraph 80, rejected, not probative. Rulings in Respondent's proposed findings of fact: Paragraphs 2 and 3, adopted in part, Paragraph 9, Recommended Order. Paragraph 12, adopted in part, Paragraph 23, Recommended Order. Paragraph 23, adopted in part, Paragraph 32, Recommended Order. Paragraph 27, adopted in part, Paragraphs 38 and 39, Recommended Order. Paragraph 30, rejected, unnecessary. COPIES FURNISHED: Thomas J. Patka, Esquire Rory C. Ryan, Esquire HOLLAND & KNIGHT 200 South Orange Ave - Suite 2600 Post Office Box 1526 Orlando, Florida 32802 Agusta P. Posner, Esquire Lisa Duchene, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399 2400 Virginia B. Wetherell Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399 2400 Daniel H. Thompson, Esquire Acting General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399 2400

USC (3) 40 CFR 260.1040 CFR 26140 CFR 261.31 Florida Laws (8) 120.57376.301376.3071376.3073403.703403.721403.722475.703
# 7
LAKE COUNTY UTILITIES, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-002356 (1979)
Division of Administrative Hearings, Florida Number: 79-002356 Latest Update: Jun. 26, 1981

The Issue The parties have raised myriad issues hare. Petitioner has alleged being capriciously and arbitrarily denied its permit because similar treatment plants have been licensed nearby. The parties disagree over whether local Lake County Pollution Control Board rules are applicable to Petitioner's plant. If the rules are applicable, they disagree over their interpretation. The parties further disagree over whether Petitioner has pending an application for a waste water treatment plant operating permit. It is this last issue which is discussed below because it is dispositive of the case.

Findings Of Fact Petitioner operates a waste water treatment plant in Lake County, Florida which serves four motels at the intersection of U.S. Highway 27 and SR 19 immediately to the south of Interchange 27 on the Florida Turnpike. On October 27, 1972, DER issued a construction permit to Petitioner to construct the plant at a design capacity of 250,000 gallons per day (gpd). The treated effluent was proposed to be discharged via a spray irrigation system to the ground water on Petitioner's site. The plant has never operated at capacity. Its normal volume has ranged from between a low of 40,000 gpd to a peak of 140,000 gpd. Petitioner's plant is situated on a 12.5 acre site over a clay hard pan. The hard pan which is immediately below the ground surface prevents adequate percolation of the plant's effluent down to the underlying ground water. During periods of heavy rain the effluent from the plant has breached a retaining dike and flowed directly into a marsh area known as the Little Everglades to the north. Petitioner has submitted four permit applications to the Department. The first, submitted in September of 1972 was for the construction permit already mentioned. The next applications dated October 22, 1973, was for an operation permit. The application indicated that there would be no discharge to surface waters but there would be a discharge to ground waters. The application also indicated that the availability of space for the expansion of the plant was limited to the site at that time. Petitioner later purchased additional land not reflected in this application. The operation permit was never granted by the Respondent. As stated by Mr. Potter, President of Lake County Utilities, Inc., "In the fall of 1973, I made an application as engineer for the utility company to the Florida DPC [Department of Pollution Control] and to Lake County for an operation permit. That permit was denied by the Department on the ground that we had not satisfied Lake County as to the total containment of our effluent." Subsequently on August 30, 1976, Petitioner submitted a construction permit application to DER for permission to add a 1.32 acre oxidation-polishing pond, to regrade and regrass the existing spray irrigation field, to construct a 0.40 acre denitrification pond and to add a nutrient uptake. No increase in the design capacity was proposed. On that application Petitioner indicated that there would be a discharge to the surface waters of the state. In answer to that part of the application which asked for proposed drainage path of the effluent Petitioner stated, "From treatment plant to 'on-site' ponds to 'on-site' grassy pond and marsh would overflow to ajacent Florida DOT [Department of Transportation] borrow pit: thence via developed drainage waste to the 'Little Everglades' swamp: then, via developed canal and ditches and through natural ponds and marshes to 'Little Lake Harris' and ultimately the Atlantic Ocean." This permit was denied by DER because the Lake County Pollution Control Board did not approve the plan. Finally on September 29, 1978, Petitioner applied for another construction permit. Thee construction would include: Construction of storm water control structures and culverts: Regrading of water and sewer plant sites; Construction of percolation pond "A" and enclosing dikes; and Construction of percolation pond "B" and enclosing dikes. This application was made in response to advice from DER that Petitioner's plant should be in a no discharge condition in order to comply with Lake County Pollution Control rules. On November 2, 1979, the Department issued a Letter of Intent to deny the last permit application because the application was deemed to be incomplete and because the further data which DER requested was not provided. In response to DER's intent to deny the construction permit Petitioner on November 20, 1979, filed its Petition for an Administrative Hearing. Petitioner does not now intend to construct the proposed facilities for which it requested the construction permit in September of 1978. The following colloquy is from the final hearing. Mr. Stephens Have you-- Can you describe briefly the nature of the changes proposed in your 1978 construction permit application? Mr. Potter 1978 construction permit application on nominally the five acre parcel to create a diked pond or lake. Mr. Stephens Uh-huh. Mr. Potter Solely that. The part on the nominally two and a half acre parcel, give or take, was to create a deep percolation pond in which I proposed digging through the clay to the sand and shell below. Mr. Stephens Uh-huh. Mr. Potter So that waters that entered that pond, A, because of its depth, would denitrify and release nitrogen contents to the atmosphere; and, the water would, because of its hydraulic head in relation to the soil below, would push its way into the soils below. Mr. Stephens Uh-huh. Mr. Potter But in the event I could not dispose of the water through that form of percolation, it would overflow into the five acre diked area. And thereby I hoped to satisfy Lake County and the D.E.R. and solve this lingering festering problem. Mr. Stephens Uh-huh. You are the Petitioner in this case. Is it your desire or intention to complete those. . .that construction? Mr. Potter Now that I have been made aware of the law, the law of Chapter four oh three, the rules of Florida D.E.R. and become clear as to the ordinances adopted by the County Commission and the Lake Pollution Board of Lake County as to Class 3-B waters, I have no intention of squandering my money, and, in effect, the money of my customers, in such a wasteful pursuit. Mr. Stephens So you're saying here under oath you don't intend to perform that work even if granted a permit? Mr. Potter Not shy of a court order. As the result of Mr. Potter's testimony on behalf of the Petitioner at the final hearing, it is found that Petitioner has withdrawn its September 1978 application for a construction permit. There is not now pending before the Department of Environmental Regulation a valid permit application for the Petitioner to operate its waste water treatment plan. On May 9, 1980 Lake County Utilities, Inc. served Petitioner's Fourth Interrogatories to Respondent which asked by Interrogatory 10: Please state when and by whom the Department of Environmental Regulation has caused field studies to be made and samples to be taken out of the waters of Lake County (and specifically the geographical vicinity of U.S. 27 - S.R. 19 - Fla. Turnpike) periodically and in a logical geographic manner so as to determine the levels of water quality of the waters as such studies and sampling is within the powers and duty of the Department as mandated by the Florida Legislature in Chapter 403 of the Laws of Florida. (emphasis in original) The Department responded: 10. The Department conducts sampling in the waters of Lake County in conjunction with individual permit applications and not on a systematic basis throughout the County. Respondent objects to this interrogatory as being irrelevant to this proceeding in that the subject permit was not denied on the basis of anticipated water quality violations, but rather, as a result of the pollution control ordinances of Lake County, Florida, which prohibit any discharge to surface waters from the subject facility, and which the Department is required to enforce pursuant to Section 403.182(6), Florida Statutes.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it Is RECOMMENDED: That the State of Florida, Department of Environmental Regulation enter a Final Order dismissing the Amended Petition for Administrative Hearing without prejudice, however, to the filing of a new application by Petitioner for a waste water treatment plant operating permit. DONE and RECOMMENDED this 12th day of May, 1981, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of May, 1981.

Florida Laws (6) 120.565120.57120.65403.087403.088403.182
# 8
JOHN W. FROST, II, AND TERRY P. FROST vs REPUBLIC SERVICES OF FLORIDA, L.P., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 09-006762 (2009)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Dec. 15, 2009 Number: 09-006762 Latest Update: Nov. 30, 2010

The Issue The issue is whether Respondent Department of Environmental Protection (DEP) may issue to Respondent Republic Services of Florida, L.P. (Republic), permits to construct and operate a Class III landfill, pursuant to Permit Numbers 266830-003-SC/01 and 266830-004-SO/01, as modified as set forth below.

Findings Of Fact Background On June 30, 2009, Republic filed with DEP an application for a permit to construct and operate a Class I landfill (Application). In response to DEP's request for additional information dated July 30, 2009 (RAI), Republic filed a response dated September 14, 2009 (RRAI), upon receipt of which, DEP deemed the Application to be complete. References to the Application typically include the Application, RRAI, and other materials, such as reports, plans, and drawings, that are part of the Application, as well as three subsequent modifications, which are detailed below. Republic revised several reports, plans, and drawings in the RRAI; references to these items, such as the Engineering Report and Operation Plan, are to the versions contained in the RRAI. On November 13, 2009, DEP filed its intent to issue construction permit #266830- 003-SC/01 (Construction Permit) and intent to issue operation permit #266830-004-SO/01 (Operation Permit; collectively, the Permit). Republic Services, Inc. and its affiliates constitute the second largest waste-management operator group in the United States. Their market capitalization is just over $11 billion. The capitalization of the affiliate formed to operate the subject landfill is doubtlessly less than $11 billion, as the record does not suggest that any significant part of the overall capitalization of Republic Services, Inc., and its affiliates would be at risk in the operation of the proposed landfill. Republic presently owns and operates a Class III landfill in the City of Bartow, Polk County, known as the Cedar Trail Landfill. The oldest part of this landfill is an unlined Class III landfill of 52.5 acres in the center of the property owned by Republic. Immediately west of this unlined landfill is a 30.7-acre lined Class III landfill, which comprises cells 1-4. The Cedar Trail Landfill is located at 2500 West State Road 60, about three miles west northwest of the intersection of State Road 60 and State Road 98, which marks the center of Bartow. The landfill is immediately west of E.F. Griffin Road. Petitioners Frost live on E.F. Griffin Road, about one mile north of the Cedar Trail Landfill. Petitioner Highland Lakes Estates Homeowner's Association serves a residential subdivision known as Highland Lakes Estates. Highland Lakes Estates occupies a notch at the southeast corner of Republic's property. Aerial photographs reveal the changing land use of the land on which Cedar Trail Landfill is situated. Fifty years ago, the land was vacant with indications of agricultural uses. At the site of the proposed landfill were mostly citrus groves on the west side and some rangeland or vacant land on the east side. Ten years later, a large area immediately northeast of the subject land reveals the effects of strip mining for phosphate. Three years later, in 1971, the mined area had greatly expanded to encompass all or nearly all of the subject site and much of the surrounding area, including the western half of what would become Highland Lakes Estates. By 1980, the pits had been refilled and active mining had ceased, and the streets had been constructed for what is now known as Highland Lakes Estates. By 1993, about three dozen homes had been built in this residential, large-lot subdivision. 9. The Cedar Trail Landfill was constructed in the early 1990s as an unlined construction and demolition debris landfill. Now designated an approved landfill for Class III waste, this facility accepts such waste as is defined by Florida Administrative Code Rule 62-701.200(14) (2010), which includes construction and demolition debris, yard trash, processed tires, asbestos, carpet, paper, glass, furniture (but not white goods), plastic, and other materials not expected to produce leachate that presents a risk to the public health or environment. A zoning/land use map reveals that the land for which the proposed landfill is proposed is designated "sewage/borrow pits/spray fields." Highland Lakes Estates occupies land that is designated single-family residential with a density of one dwelling unit on up to 2.49 acres. The Cedar Trail Landfill has been the subject of three recent environmental resource permits (ERPs). Appendix R to the Application is an individual ERP issued in April 2009, and Appendix R to the RRAI is a conceptual ERP issued in March 2005. The April 2009 ERP mentions that the entire stormwater project was conceptually approved by an ERP issued on September 10, 2008, but this ERP is not part of the record. In any event, these ERPs approve the construction of a comprehensive stormwater or surface water management system for the entire Republic property. In particular, the April 2009 ERP permits the construction of a borrow pit at the southeast corner of the Republic property and a modification of the perimeter ditch/wet retention system. The April 2009 ERP states that the permitted stormwater management system will provide total onsite retention for runoff from the 100-year, 24-hour storm. The April 2009 ERP requires 2.8 acres of compensation for 2.8 acres of encroachment in the 100-year floodplain. Specific Condition 14 prohibits excavation of the borrow pits to a clay confining layer or limestone bedrock layer. Specific Condition 20 prohibits the mixing of leachate with stormwater and provides that, if leachate enters stormwater, the stormwater becomes leachate. Presumably reflecting this permitting activity, Application Drawing 4, as revised in the RRAI, is the site plan, including the unlined Class III landfill, the four-cell lined Class III landfill immediately to the west of the unlined landfill, and the eight cells proposed to accept Class I waste. These eight cells are immediately south of the four cells of the lined Class III landfill. The two northernmost of these eight cells abut, on their east boundary, the unlined Class III landfill. The remaining six cells abut, on their east boundary, an 800-foot wide borrow pit, which lies between these cells and Highland Lakes Estates. Immediately north of Highland Lake Estates is a second borrow pit, and west of this borrow pit is the unlined Class III landfill. The other major feature on the site plan is a third borrow pit running, from west to east, along the north border of the lined Class III cells, the unlined Class III landfill, and the second borrow pit. Bearing no signs of ambitious reclamation activity, the backfilled mining cuts host large water storage areas and, as described in the application for the March 2005 ERP, wetlands of "very poor quality." The backfilled soils are best described as complex surficial soils, consisting mostly of fine sands with varying amounts of organics, silts, and clays. Geotechnical investigations of the Cedar Trail Landfill suggest that mining depths, although variable, probably averaged 40 feet. Petitioners and Intervenor are substantially affected by the Permit and the construction and operation of the proposed landfill, which will stand nearly 200 feet above grade and will be the focus of substantial activity six days per week during its years of operation. Like Petitioners, Intervenor owns land in the immediate vicinity of the Cedar Trail Landfill, which is in the jurisdiction of Intervenor, and Intervenor's various municipal operations are much affected by whether the proposed Class I landfill is permitted. Among other things, Intervenor has agreed to accept untreated leachate from the proposed landfill. Petitioners Frost built their home in 1980 or 1981. During the hours of operation of the existing landfill, Petitioners Frost constantly hear the beeping noise of heavy- duty equipment, presumably a safety device when the equipment is moved. Over a dozen lots in Highland Lakes Estates abut the property line of the Cedar Trail Landfill, and the closest residence is about 1000 feet from the nearest proposed Class I cell. At present, the existing landfill subjects the Highland Lakes Estates to constant noise during operating hours and a coating of dust inside their homes. Several residents of Highland Lakes Estates testified. Hard-working people, some of whom are now retired, these residents decided to purchase homes in Highland Lakes Estates because it was a sunny, healthy place to live. Over time, most of these residents, by varying degrees, have come to accept the fact of the Class III operations at Cedar Trail Landfill, but they object to the substantial intensification of land use that will result from a regional Class I landfill. One resident testified that she finds in her pool dirt that has escaped from the existing landfill, and she has become concerned about her grandchildren coming over to swim. Another resident testified that he only began closing his windows five or six years ago when the noise levels at the existing landfill increased; he eventually had to install a window air- conditioner. The same resident testified that the green herons and snowy egrets that he used to see around his house have not returned for five years, and his wife, who has health problems, including respiratory distress, would suffer from the expanded landfill operations. Application, RRAI, and Permit, Including Modifications The Permit incorporates the Application, including the RRAI, Engineering Report, Operation Plan, and drawings. Thus, all of the documents are part of the Permit. In the Application, Republic proposes to convert cells 5-8, which are not yet constructed, from a Class III to a Class I landfill and add four new cells adjacent to the unused cells. The unfilled portion of Cells 1-4 would continue to receive only Class III waste. Pursuant to Florida Administrative Code Rule 62-701.200(13) (2010), Class I waste is all solid waste, other than hazardous waste, that is not otherwise prohibited by rule. The Application states that the proposed landfill will serve communities within 100 miles. The service area of this regional landfill will thus extend in central Florida from Marion to Osceola counties, along the Gulf Coast from Pasco to Lee counties, and along the Atlantic Coast from Volusia to Martin counties. As stated in the Application, this service area is populated by 9.7 million persons, who would daily account for 3000 tons of waste at the Cedar Trail Landfill. Initially, according to the Engineering Report, the proposed landfill will receive 1600 tons per day of Class I waste, but, once the existing Class III cells are filled, the proposed landfill will receive 1600 tons per day of Class I waste plus the 1400 tons per day of the Class III waste that is currently going into the existing landfill. As revised by the RRAI, the life expectancy of the proposed landfill is seven years. The Application states that Republic will employ an attendant, a trained operator, and 3-5 spotters at the landfill. The Application reports that the landfill would operate Monday through Saturday from 7:00 a.m. to 6:00 p.m. and that the working face would be covered daily. The Application reports that Republic would install seven new detection wells and use 17 existing wells for monitoring groundwater and would use two existing staff gauges for monitoring surface water, evidently at a single location, as discussed in the next paragraph. 23. Application Appendix V is the Water Monitoring Plan. Appendix V states that surface water will be monitored every time that the stormwater pond for the leachate storage area discharges offsite, but not more frequently than weekly. Application Drawing 4, as revised in the RRAI, shows that the sole surface water monitoring location is close to the leachate storage tanks, which are described below. 23. Appendix V also requires leachate monitoring, "at least annually," for five field parameters--specific conductivity, pH, dissolved oxygen, colors, and sheens; eight laboratory parameters--including chloride, mercury, and total dissolved solids; and the parameters listed in 40 CFS Part 258, Appendix II, which includes a comprehensive list of volatile organic compounds; persistent organic pollutants, including 2,3,7,8-TCDD (a major dioxin) and Dibenzofuran; and metals, including lead and chromium. Fourteen days prior to all sampling events, Republic is required to notify DEP, so that it may obtain split samples for its own analysis. Republic is required to report the results of the groundwater monitoring quarterly and to analyze the groundwater data in a technical report filed with DEP every two years. Appendix V also requires monitoring for odors and combustible gases, mostly methane. Republic will monitor combustible gas quarterly at various ambient locations, such as the office buildings and to monitor combustible gas quarterly in the soil down to the seasonal high water table. The purpose of this monitoring is to determine combustible gas concentrations and, if they exceed 25%, take "all necessary steps to ensure protection of human health." Some confusion in the Application arises as to the issue of whether the Cedar Trails Landfill will be subject to, or voluntarily implement, the more elaborate provisions applicable to a landfill covered under Title V of the federal Clean Air Act, as amended in 1990. Regulated emissions for a new source might include particulate matter, sulphur dioxide, nitrogen oxides, volatile organic compounds (VOCs), and specified hazardous air pollutants. Appendix V states that the landfill will become a Title V landfill once permitted to receive Class I waste, and, at that time, it will be subject to a "more comprehensive system of landfill gas collection and monitoring." Appendix V assures that these items "will be addressed in separate documentation from this monitoring plan"--and, apparently, separate from the present record. By contrast, the Operation Plan concedes only that, based on the nature of Class I waste and the design capacity of the proposed landfill, Cedar Trail Landfill "may" become a Title V facility. The Operation Plan states: "If the regulatory thresholds at [Cedar Trail Landfill] are met [under Title V] requiring an active gas collection and control system (GCCS), [Cedar Trail Landfill] will submit as required the GCCS design plans for approval and install an active gas extraction system within the regulatory timeframes specified by Title 40, Code of Federal Regulations, Part 60, Subpart WWW." More specific provisions in the Operation Plan identify best management practices to prevent objectionable odors. Four practices are identified, including an "active gas collection and extraction system." On the DEP form application, which is a cover sheet to the more elaborate application materials, Republic checked boxes indicating that the landfill would use active gas controls with gas flaring and gas recovery, which is probably what is meant by an "active gas collection and extraction system." The Application provides that the landfill liner would be double composite; the leachate collections system would consist of collection pipes, geonets, and a sand layer; the leachate would be stored in tanks; some of the leachate would be recirculated as spray on the working face; and the remainder of the leachate would be stored onsite and periodically transferred to a wastewater treatment center for treatment. The Engineering Report states that the waste disposal footprint will not be located where geological formations or other subsurface features will not provide support for the waste. The Engineering Report identifies appendices addressing the slope-stability analysis and foundation analysis and relies on a March 12, 1997, report by Ardaman & Associates, Inc. (Ardaman Report), January 23, 2004, report by Golder Associates, Inc. (Golder Report), and June 26, 2009, report by Hanecki Consulting Engineers, Inc. (Hanecki Report). These items are discussed in greater detail below in connection with the sinkhole issue. The Engineering Report assures that the waste disposal footprint will not be within 500 feet of an existing or approved potable water well, nor will it be within 1000 feet of an existing or approved potable water well serving a community water supply. The Engineering Report adds that the minimum horizontal distance between waste deposits and the property line is 100 feet. The Engineering Report assures that the landfill footprint will not be in a dewatered pit, as the installation elevations are at least 2-3 feet higher than the seasonal high water table. The Engineering Report acknowledges that a small part of the eastern end of the four southernmost cells lies within the 100-year floodplain, as depicted by the Flood Insurance Rate Map effective December 29, 2000, and as shown in Application Appendix A, Drawing 1. Claiming that the relevant map was not revised in 2000, the Engineering Report asserts that the last update to the FIRM map was in 1975, and the depicted floodplain was filled during the mine reclamation process. The Engineering Report notes that the floodplain concerns were addressed in the April 2009 ERP. 34. The Engineering Report discloses two enforcement actions against Republic at the Cedar Trail Landfill. In a letter dated October 19, 2001, DEP warned Republic about noncompliant items at the site, and, in a notice of noncompliance dated January 30, 2006, DEP warned Republic not to use a new cell prior to construction certification of the cell's stormwater system. Both matters were reportedly resolved, and Republic has not been the subject of other enforcement actions for the Cedar Trails Landfill. At DEP's urging, the RRAI elaborates on enforcement actions against Republic or, evidently, Republic affiliates at a variety of Florida facilities, not just landfills. The additional information reveals that DEP imposed a fine of $61,300 for the October 2001 violations, which included disposing of unacceptable waste, storing an excessive number of tires and exceeding groundwater standards without notifying DEP, and a fine of $1000 for the January 2006 notice of noncompliance. The other enforcement actions against Republic or affiliates concerning landfills involved consent orders about the Nine Mile Road Landfill (Seaboard Waste): in February 2003, DEP imposed a fine of $13,000 in settlement of charges that employees were not removing all unacceptable waste from the site and, in November 2005, DEP imposed a $285 fine for a failure to submit required stormwater monitoring reports. There were many other enforcement actions, generally resulting in modest fines, but they involved hauling facilities, transfer stations, and materials recovery facilities, not landfills. The Engineering Report states that the proposed landfill is within six miles of, but greater than 10,000 feet from, the Bartow Municipal Airport. Airport safety is addressed in more detail below. The Engineering Report describes in detail the double composite liner system, which uses materials whose physical, chemical, and mechanical properties prevent failure due to contact with Class I waste and leachate, climactic conditions, installation stress, and other applied stresses and hydraulic pressures. The Engineering Report performs no contingency sinkhole analysis. The report does not suggest that the liner system could withstand the stresses and pressures resulting from any size sinkhole, so the necessary inference is that the liner will fail if any sinkhole forms directly beneath it. The Engineering Report states that waste placement will remain within the lined containment berm. The Engineering Report describes in detail the double composite liner system for use at the proposed landfill. The primary liner system and secondary liner system each comprises three layers with the top layer consisting of a composite drainage net, the middle layer consisting of a high-density polyethylene geomembrane with a minimum average thickness of 60 ml, and the bottom layer consisting of a geosynthetic clay liner with a maximum hydraulic conductivity of 5 x 10-9 cm/second. The Engineering Report describes in detail the leachate collection and removal system, which, sitting atop the primary liner, includes a 24-inch thick sand drainage layer with a minimum hydraulic conductivity of 1 x 10-3 cm/second, a composite drainage net, and a single perforated 8-inch diameter lateral pipe in each cell. The collection lateral pipes will gravity drain to the east to a header pipe that gravity drains to the primary leachate collection pump stations--one station for the four converted cells and one station for the four new cells. A smaller leachate collection and removal system will handle the leachate that penetrates to the leak detection layer by routing it to a secondary leachate collection pump station. Based on calculations derived from the HELP groundwater model, the leachate collection and removal system is designed to prevent leachate head from exceeding the thickness of the composite drainage net (about 1 cm) over the secondary geomembrane and from exceeding one foot over the primary geomembrane. According to the Engineering Report, flow meters will be installed at each of the pump stations to allow daily readings of the amount of leachate being pumped. At one foot of head over the primary liner, the Engineering Report expects just over three gallons per day collected at each secondary leachate collection pump station--significantly less than the leakage rate typical of a double liner system without a geosynthetic clay liner beneath the primary liner. However, the Engineering Report provides a standard action leakage rate of 100 gallons/acre/day, meaning that Republic is required to report to DEP liner leakage only when this leakage rate is attained. The pump stations will transmit the leachate to one of two above-ground, 150,000-gallon storage tanks. From these tanks, most of the leachate will be transported to an offsite location for treatment. However, up to 12,000 gallons per day of the untreated leachate will be recirculated to be sprayed on the working faces of the landfill. This is to control dust and possibly to assist with the degradation of the waste. The Engineering Report states that the Cedar Trail Landfill implements a facility-wide water quality monitoring plan. Upon completion of the pump stations for the eight cells that are the subject of the Application, Republic will expand its leachate sampling program to include annual sampling of the leachate collected in the primary and secondary leachate collection pump stations. The groundwater monitoring wells would be installed as closely as possible to the outer edge of the roadway that, with a stormwater ditch, will run the perimeter of the proposed Class I landfill. In the revised Engineering Report contained in the RRAI, Republic proposes a surface water discharge point in the stormwater pond located near the leachate storage tanks. The Engineering Report adds that Republic will continue to comply with the following prohibitions: No waste will be knowingly burned on site; Hazardous waste will not knowingly be accepted; PCB contaminated waste will not knowingly be accepted; Untreated biomedical waste will not knowingly be accepted. Please note that treated biomedical waste may be accepted at [Cedar Trail Landfill]'s Class I Landfill provided that the waste containers are marked "Treated Biomedical Waste.;" No waste disposal at the proposed Class I Landfill will occur within 3,000 feet of a Class I surface water body; [Cedar Trails Landfill] will not knowingly accept liquid waste within containers, excluding leachate and gas condensate derived from solid waste disposal operations. [Cedar Trails Landfill] will comply with the requirements of Rule 62- 701.300(10), FAC regarding the handling of liquid wastes; Neither oily waste nor commingled oily waste will knowingly be accepted; and Lead-acid batteries, used oil, white goods, and whole-waste tires will not knowingly be disposed of in the Class I waste disposal system. The Joint Stipulation to Permit Modification, identified above, adds four items to this list of operational prohibitions: i. Garbage will not be knowingly accepted; Household Waste, except waste from residential sources generated as Class III waste, will not be knowingly accepted; Animal carcasses will not be knowingly accepted; and Aluminum dross will not be knowingly accepted. Capitalized terms are generally defined in the Florida Administrative Code. Florida Administrative Code Rule 62-701.200(39) defines "Garbage" as " all kitchen and table food waste, and animal or vegetative waste that is attendant with or results from the storage, preparation, cooking, or handling of food materials." Application Appendix H is the Operation Plan, which also identifies the types of wastes to be permitted at the proposed landfill. Section 3(b) of the Operation Plan authorizes the proposed landfill to accept: Commercial waste Ash residue Incinerator by-pass waste Construction and demolition debris, including from a residence Treated biomedical waste Agricultural waste Industrial waste Yard trash, including from a residence Sewage sludge Industrial sludge Water/air treatment sludges Waste tires De minimis amounts of non-hazardous waste from incidental residential sources Section 5 of the Operation Plan provides, in relevant part: [Cedar Trail Landfill] will accept waste included in any of the waste categories identified under Section 3(b) of this Operation Plan[, but] will . . . NOT knowingly accept any hazardous waste, untreated biomedical waste, liquid waste (including paint), explosive waste, toxic waste, or radioactive waste for disposal at the [Cedar Trail Landfill.] Unacceptable types of refuse are listed below and will not be knowingly accepted for disposal. --Hazardous waste --Explosive waste --Radioactive waste --Drums that have not been opened and Emptied --Refrigerators, freezers, air Conditioners (white goods) --Any toxic or hazardous materials, i.e. batteries, solvents, oil, etc. --Automobiles or parts that contain fuel, lubricants, or coolants --Untreated Biomedical waste The original Application prohibited the acceptance of septic tank pumpage, but the application form accompanying the original Application indicated that the proposed landfill would accept industrial sludge and domestic sludge. After modification by the RRAI, the prohibition against accepting septic tank pumpage was deleted, and the Operating Plan added, among acceptable wastes, sewage sludge, industrial sludge, and water- and air-treatment sludge. Florida Administrative Code Rule 62-701.200(101) (2001) defines "sludge" to include solid waste pollution control residual from an industrial or domestic wastewater treatment plant, water supply treatment plant, air pollution control facility, septic tank, grease trap, portable toilet, or other source generating a waste with similar characteristics. Florida Administrative Code 62-701.200(64) (2001) defines "liquid waste" as any waste with free liquids, according to the "Paint Filler Liquids Test." As modified by the Joint Stipulation to Permit Modification, Section 5 of the Operation Plan was amended to add the following items to unacceptable types of refuse that will not be knowingly accepted for disposal: --Garbage --Household Waste, except waste from residential sources generated as Class III waste --Animal carcasses --Aluminum dross At the hearing, Republic and DEP agreed to an additional condition to the Operation Plan that unacceptable waste would include Garbage contained in commercial, industrial or agricultural waste. According to the Operation Plan, the initial waste screening occurs at the gate house where the attendant interviews the driver and inspects the incoming waste load. If the attendant sees more than a negligible amount of unauthorized wastes, he will reject the load and will contact the hauler to identify the source of the waste. Additionally, Republic will notify DEP if anyone tries to dispose of hazardous waste at the proposed landfill. As modified by the Joint Stipulation to Permit Modification, the Operation Plan was amended to provide a new paragraph between the paragraph addressing the initial waste screening at the gate house and, as discussed below, the second screening at the working face. The new paragraph provides: Any malodorous waste will be covered with mulch and/or additional soil or other approved cover materials to control odors promptly, within one (1) hour from the time of unloading, except in the event of exigent circumstances, such as extreme weather. Cedar Trail Landfill will promptly cover any sludge deposited on the landfill working face within one (1) hour from the time of the unloading, except in the event of exigent circumstances, such as extreme weather. At the hearing, Republic and DEP agreed to an additional condition to the Operation Plan, which would prohibit Republic from accepting malodorous waste or sludge that, due to exigent circumstances, it would not be able to cover within one hour from the time of unloading. If the load passes the initial waste screening, it will proceed to the working face of the landfill, according to the Operation Plan. At least one spotter will be stationed at the working face at all times that the landfill receives waste. Her job will be to detect unauthorized wastes. Republic is to assure that it has a sufficient number of spotters to find and remove unauthorized waste prior to compaction. The Operation Plan allows the spotter to work from ground level or the cab of a compactor. If the operator of a piece of heavy equipment is trained as a spotter, she may also serve as a spotter. During periods of higher waste traffic, the equipment operator will, according to the Operation Plan, "likely" need the assistance of another operator or spotter to screen the higher waste volumes. When finding unauthorized wastes in manageable volumes, the spotter or operator will remove these wastes by hand and place them into nearby containers for removal to an appropriate facility. The third waste screen occurs as the equipment operator spreads the waste, pursuant to the Operation Plan. The equipment operator is required to place any unacceptable observed wastes into containers, which will be located "within the lined area." These wastes will also be removed to an appropriate facility. In the RAI, DEP questioned the proximity of the containers to the working face, as the lined area consists of 72 acres, but, in the RRAI, Republic ignored the comment, restating only that the containers would not be located outside the lined area. The Operation Plan specifies a filling sequence. Republic will assure that the first layer of waste placed above the liner in each cell will be a minimum of four feet in compacted thickness and will be free of rigid objects that could damage the liner or leachate collection and removal system. Republic will maintain the working face to minimize the amount of exposed waste and initial cover necessary at the end of each day. The filling sequence will proceed until the permitted final grade elevations have been reached, less three feet for the final cover. The Operation Plan states that the initial cover at the Class I landfill will consist of a six-inch layer of soil that is transferred from onsite borrow pits or offsite sources. This soil will be compacted and placed on top of the waste by the end of each work day. At Republic's option, subject to DEP's approval, it may use a spray-on or tarpaulin cover, instead of a soil cover. The Operation Plan requires Republic to apply at least one foot of intermediate cover within seven days of cell completion, if additional waste will not be deposited within 180 days of cell completion. Republic may remove all or part of this intermediate cover before placing additional waste or the final cover. Through the placement of initial, daily, and intermediate cover, Republic will minimize the occurrence of moisture infiltration, fires, odors, blowing litter, and animals and other disease vectors. 59. The Operation Plan requires Republic to control litter primarily by daily waste compaction and cover. However, at least daily, if needed, employees will collect litter along the entrance and access roads and around the working face. Complaints about litter must be logged. In addition to the inspections detailed above, the Operation Plan establishes a random load-checking program to detect unauthorized wastes. Each week, Republic employees will examine at least three random loads of solid waste by requiring drivers to discharge their loads at a designated location within the landfill where the employees may undertake a detailed inspection. All random inspections will be logged. Notwithstanding the daily limit of 12,000 gallons per day, the Operation Plan prohibits Republic from spraying leachate during rain events. To apply the recirculated leachate, the lead operator will drive the leachate tanker truck on the working face, so that it can spray leachate over waste as it is being compacted, but after it has been screened by spotters. The spraying will be done to avoid causing leachate to pond atop the waste and will not be done within 50 feet of an outside slope. No restrictions apply to wind conditions. The Operation Plan states that, if the annual sampling of leachate water quality at the two pump stations reveals a contaminant in excess of the permissible limits listed in 40 CFR Part 261.24, Republic will start monthly sampling and notify DEP in writing. Also, the Cedar Trail Landfill will maintain a recording rain gauge. The Operation Plan requires Republic employees to conduct daily surveys for objectionable odors and take immediate corrective action, if odors are found at the property line. As modified by the Joint Stipulation to Permit Modification, this portion of the Operation Plan was amended to add two odor- remediation actions and another form of odor inspection. The two additional actions to prevent odors are to 1) provide additional cover using mulch, additional soil, or other approved cover material and 2) use odor masking or neutralizing agents. The new inspection provision states: Internal inspection will be performed on a weekly basis by a properly trained odor ranger or equivalently trained person. Such individual will tour the facility, property boundary, and the subdivision of Highland Lakes Estates . . . to identify any odors leaving the Landfill's property boundaries. The results of each weekly inspection will be document, and any odors identified will be mitigated. Another new provision from the Joint Stipulation for Permit Modification applies to the handling of sludge. As amended, the Operation Plan states: When accepting sludge from a new source or distributor, [Republic] will obtain information regarding the characteristics and constituents of the sludge, including a description of the industrial process or circumstances that resulted in the generation of the sludge. Upon delivery of the sludge, [Republic] will mix lime, sodium hydroxide, or any other suitable agents to eliminate objectionable odors as required during disposal of the sludge before the material is covered. Furthermore, [Republic] will obtain advance notice from contributors prior to delivery of any sludge and shall promptly cover any sludge unloaded on the landfill working face within one (1) hour from the time of unloading, except in the event of exigent circumstances, such as severe weather. [Republic] shall use its best efforts to avoid accepting or disposing of sludge on Saturdays, Sundays, or public holidays. Additionally, with respect to sludge received from wastewater treatment facilities only, such sludge shall not exceed the lesser of (1) twenty percent (20%) of the total volume of waste disposed in the landfill on an average monthly basis, determined annually on the prior calendar year, or (2) two-hundred (200) tons per day, averaged over the prior 12-month calendar year. Republic is required to monitor combustible gases quarterly and transmit the results to DEP, according to the Operation Plan. If Republic detects methane above the limits specified in Florida Administrative Code Rule 62-701.530 (2010), Republic must submit a gas remediation plan to DEP within seven days. The Operating Plan indicates that the separation of the waste from the groundwater prevents the saturation of the waste and, thus, the generation of odor. Sloping and compacting will promote stormwater runoff, again to discourage the generation of odor. The Construction Permit authorizes construction of the proposed landfill in accordance with the "rules[,] . . . reports, plans and other information" submitted by Republic "(unless otherwise specified)." This parenthetical reference provides that the provisions of the Construction Permit control over any contrary provisions in the other documents that are part of the Permit due to incorporation by reference. In addition to the original Application, RRAI, and drawings, the Construction Permit also incorporates Florida Administrative Code Chapter 62-701 (2001). The Construction Permit states that Republic may not violate the prohibitions set forth in Florida Administrative Code Rule 62-701.300, which is discussed in the Conclusions of Law. Construction Permit Specific Condition A.9.a requires notification to DEP of the discovery of limestone during excavation or discovery. Specific Condition A.9.b requires notification to DEP of any surface depressions or other indications of sinkhole activity onsite or within 500 feet of the site. Specific Condition A.9.c prohibits open burning. Construction Permit Specific Condition C.1.b prohibits the discharge of leachate, during construction or operation, to soils, surface water, or groundwater outside the liner and leachate management system. Specific Condition C.4 prohibits the acceptance of hazardous waste and does not condition this prohibition on Republic's knowledge that the waste is a hazardous waste. Specific Condition C.5 requires Republic to "control . . . odors and fugitive particulates (dust)" and "minimize the creation of nuisance conditions on adjoining property." "Nuisance conditions" include "complaints confirmed by [DEP] personnel upon site inspection." Specific Condition C.5 orders Republic to "take immediate corrective action to abate the nuisance" and to "control disease vectors so as to protect the public health and welfare." Construction Permit Specific Condition C.6.b requires immediate notice to DEP of any sinkholes or other subsurface instability. Specific Condition C.8 requires Republic to manage leachate in accordance with the Operating Permit and Florida Administrative Code Rule 62-700.500(8). The Operating Permit incorporates the same materials that are incorporated into the Construction Permit, again "(unless otherwise specified)." Like the Construction Permit, the Operating Permit incorporates Florida Administrative Code Chapter 62-701 (2001) and requires immediate notice to DEP in the event of a sinkhole or subsurface instability. The Operating Permit specifies that the action leakage rate is 100 gallons per acre per day and the leachate recirculation rate is 12,000 gallons per day. As modified by the Joint Stipulation to Permit Modification, Operating Permit Specific Condition A.1.b states: This Facility is not authorized to accept Garbage; untreated Biomedical Waste; animal carcasses; liquids and non-liquid PCB containing materials or wastes with a PCB concentration greater than or equal to 50 parts per million; Liquid Waste; and aluminum dross. Additionally, this facility is not authorized to accept Household Waste, except waste from residential sources generated as Class III waste. Class III waste means yard trash, construction and demolition debris, processed tires, asbestos, carpet, cardboard, paper, glass, plastic, furniture other than appliances, or other materials approved by [DEP] that are not expected to produce leachate which are a threat to public health or the environment as defined in Rule 62-701.200(14), F.A.C. Based on this authorization to allow certain wastes as described above from residential sources, and since the landfill design, including liner and leachate collection systems, meets the requirements of Chapter 62-701, F.A.C., for Class I landfills, the facility will be entitled to [the] household hazardous waste exemption pursuant to 40 C.F.R. 261.4(b)(1). Specific Condition A.9.c prohibits open burning. Operating Permit Specific Condition C.1.b prohibits the discharge of leachate to soils, surface water, or groundwater outside the liner. Specific Condition C.1.c prohibits the discharge of "residual contaminants," such as gasoline, oil, paint, antifreeze, and polychlorinated biphenyls (PCBs), onto the ground or into surface water or groundwater. Operating Permit Specific Condition C.1.k(1) provides that authorized waste types are those listed in Section 3(b) of the Operations Plan, and unacceptable wastes shall be removed from the site as described in Sections 3(a) and 7. As modified by the Joint Stipulation to Permit Modification, Operating Permit Specific Condition C.1.k(1) provides: "Waste types authorized for management at this site are those listed in Section 3(b) of the Operations [sic] Plan. Unacceptable wastes are those listed in Section 5 [of the Operation Plan] " Operating Permit Specific Condition C.1.k(2) requires the use of a sufficient number of spotters to remove unacceptable wastes, but allows Republic to direct its equipment operators to serve as spotters from the equipment. This condition allows DEP to require that spotters work from the ground, if DEP determines that spotting from equipment is not effective. Specific Condition C.1.k(3) requires Republic to remove unacceptable wastes immediately and not to unload additional wastes in the immediate vicinity until placing unacceptable wastes in the designated waste containers" "near the working face" and within the lined landfill area. Operating Permit Specific Condition C.1.l(2) requires Republic to inspect on each operating day the property boundary for objectionable odors and, if any are detected, abate them in accordance with Specific Condition C.5. Specific Condition C.5.a requires Republic to control odors, disease vectors (insects and rodents), and fugitive particles (dust and smoke) to protect the public health and welfare. Control is defined as "minimiz[ing]" the creation of nuisance conditions on adjoining property. Odors confirmed by DEP personnel are a nuisance condition, and Republic must take immediate corrective action to "abate" the nuisance. Specific Condition C.5.b provides that, if odor control measures do not "sufficiently abate" objectionable odors within 30 days, Republic will submit an odor remediation plan to DEP for approval. Operating Permit Specific Condition C.8.e requires monthly reports to DEP of leachate quantities. Specific Condition C.8.h(1) prohibits recirculation of leachate at rates that result in seepage that may discharge outside the lined area. Leachate may not be sprayed when the application area is saturated or during a rainfall event. There is no prohibition against spraying during windy conditions. Operating Permit Specific Condition E details the extensive water quality monitoring requirements. However, Specific Condition E.9.b requires only annual testing of the five field parameters, eight laboratory parameters, and the comprehensive list of Appendix II parameters set forth in 40 CFR Part 258, all of which are identified below. Specific Condition E.9.c provides that, if a contaminant listed in 40 CFR 261.24 exceeds the level listed therein, Republic will notify DEP and take monthly leachate samples until no exceedances are detected for three consecutive months. Operating Permit Specific Condition F.1.a states: "This solid waste permit will meet the statutory requirement to obtain an air construction permit before . . . constructing a source of air pollution, except for those landfills that are subject to the prevention of significant deterioration (PSD) requirements of Chapter 62-212, F.A.C." Such facilities are required to obtain an air construction permit from the Bureau of Air Regulations prior to construction. Specific Condition F.1.b requires Republic to comply with Title V of 40 CFR 60, Subparts WWW and CC. This section notes that Title V permit applications must be submitted to the District Air Program Administrator or County Air Program Administrator responsible for the landfill. Aviation Safety Landfills attract birds in search of food. Flying birds may interfere with aviation safety. Thus, landfills are typically not located in close proximity to airfields to minimize the risk that flying birds will interfere with airborne aircraft approaching or departing from an airport. The nearest airport to the Cedar Trail Landfill is the Bartow Municipal Airport, which is operated by the Bartow Aviation Development Authority. This airport is over five miles from the footprint of the active landfill and 4.6 miles from the boundary of the proposed site. Republic provided notice of the Application to all airports within six miles of the proposed landfill, the Federal Aviation Administration, and the Florida Department of Transportation. None of these entities objected to the proposed landfill. When Republic gave the Bartow Aviation Development Authority notice of an earlier application, which sought a permit for a landfill that would accept garbage, the authority objected to the proposal due to concerns posed by birds to aviation safety. When asked about the Application, the authority's executive director testified that she still has concerns about the proposed landfill, but she did not specify the nature of her concerns or her analysis. As explained in the Conclusions of Law, these are the only facts required for a determination of whether Republic has provided reasonable assurance of aviation safety. The record provides no basis for finding that Republic has failed to provide reasonable assurance of aviation safety. Neither the FAA nor the Bartow Aviation Development Authority has objected to the proposed landfill. The executive director's unspecified concerns do not override the absence of a formal objection from these agencies. Petitioners assign too much weight to the earlier objection submitted by the authority. The composition of the authority may have changed or some authority members may have decided they were wrong in their earlier analysis. This earlier objection does not outweigh the absence of objection to the present proposal from any of the aviation agencies and the absence of any evidence of the expected nature or extent of bird usage of the proposed landfill and the extent to which these birds would interfere with existing and expected flight paths of aircraft using the Bartow Municipal Airport. Public Health Petitioners' expert witness on public-health issues, Dr. David Carpenter, is a medical doctor with a long, prestigious history of public service, including with the Department of Defense, the National Institutes of Mental Health, the United States Public Health Service, and the New York Department of Health, where he served as director from 1980-85. At that time, Dr. Carpenter started the School of Public Health at the University of Albany. Republic's expert witness on public-health issues, Dr. Christopher Teaf, is an expert in the evaluation of environmental contamination, waste management, and toxicology, but not a medical doctor. Dr. Teaf is a professor at Florida State University and owns a small consulting firm. The major part of Dr. Carpenter's career has been devoted to research. For the past ten years, he has focused more on human health, especially human disease from exposure to environmental contaminants. Dr. Carpenter has considerable experience with the adverse effects of landfills on human health, but his experience has been mostly with older landfills, where containment measures were few and offsite releases were many. Clearly, Dr. Carpenter's experience does not extend to the role of landfill design, construction, and operation in the transmission of human disease. Thus, Dr. Carpenter is qualified to opine on the effects of pollutants that may escape landfills, but not on the relationship of landfill design, construction, and operation on the probability that a landfill will transmit pollutants. For the most part, Dr. Carpenter did not attempt to address matters outside of his expertise. However, Dr. Carpenter testified that the risk of disease or injury increased in relationship to the proximity of the person to the landfill. This testimony can only be credited if one assumes that the landfills are identical in terms of design, construction, and operation and in terms of the environmental conditions of the landfill site. In other words, in real-world applications, it is impossible to credit this element of Dr. Carpenter's testimony, especially to the extent of his implicit suggestion that public health is unreasonably endangered by the construction of a landfill, in compliance with all rules, that satisfies all of the separation criteria and design criteria set forth in the rules, as discussed below. By contrast, Dr. Teaf focused on the details of the proposed landfill. Applying his knowledge of toxicology, Dr. Teaf determined that the proposed landfill adequately protects public health. In making this determination, Dr. Teaf analyzed the effects of various design and operational characteristics of the proposed landfill, including the double liner system, the leachate collection and management system, the selection of appropriate waste types, the procedures for the evaluation and covering of sludges, the prohibition against municipal garbage, the restrictions on household items, the monitoring of groundwater and surface water, the stormwater management system, and the plans to control dust and odors. Dr. Carpenter's testimony and the literature that he sponsored suggested important links between older landfills and a wide range of human disease. But the recurring problem with Dr. Carpenter's testimony and the research articles that he sponsored was the inability to link this information to the proposed landfill. All of the landfills studied in his research articles were older, and most of them appeared to have been designed, constructed, and operated under far more relaxed regulatory regimes than exist today. Nothing in Dr. Carpenter's testimony or sponsored literature attempted to delineate the design or operational characteristics of these landfills, such as whether they were double- or even single-lined, served by leachate circulation and recovery systems, limited as to materials that they could accept, or required to install stormwater management and water monitoring systems. 93. Analysis of the risk to public health posed by the proposed landfill requires consideration of the various means of transmission of the pollutants received by the landfill: water, land, and air. Of these, water requires little analysis, on this record. Even Dr. Carpenter conceded that the proposed landfill does not appear to pose a threat to groundwater. The double liner, leachate collection and recovery system, and groundwater monitoring plan support the finding that groundwater transmission of pollutants from the proposed landfill is unlikely. Transmission by surface water is also unlikely. Compared to groundwater monitoring, surface water monitoring is limited. For instance, there is only a single monitoring site. Also, as noted above, the stormwater pond for the leachate storage area is expected to discharge stormwater offsite during excessive storm events, at which time surface water samples will be taken. However, a comprehensive surface water management system is in place at the landfill and will prevent offsite discharges in all but a few excessive rain events. Transmission by land is also unlikely. The Application contains engineering analysis of the proposed stability of the side slopes and a determination that they will be stable. The discussion of sinkholes, below, does not affect this finding. Treating dust as transmission by air, the only other means by which pollutants may transmit by land is by animals, such as insects, rodents, and birds. An important factor limiting the activity of animals in spreading pollutants offsite is the fact that the proposed landfill will not receive garbage. Although putrescible waste may be received within other categories of waste, the prohibition against receiving garbage will greatly reduce the amount of potential food sources for animals and thus the utilization rate of the proposed landfill by these animals. A further reduction in animal utilization will be achieved through the daily and intermediate cover requirements. Thus, transmission of pollutants by animals is also unlikely. Transmission by air takes several forms. Pollutants may be transmitted as or on dust, with water in the form of aerosol, or as gas. In terms of how transmission by air is addressed by the Permit, this means of transmission potentially represents a greater threat than transmission by water or land for four reasons. First, the explicit focus of the Permit, as to gas, is to avoid explosive concentrations of methane and objectionable odors, but not the transmission of other pollutants by air. Second, the effect of the Permit is to prohibit the release of pollutants into the groundwater or offsite surface water and to prohibit the release of pollutant-bearing land offsite, but no such flat prohibition applies to the offsite release of pollutants by air. Third, the leachate recirculation system provides a good opportunity for the release of certain pollutants into the air by aerosol or evaporation, but similar releases to offsite land, surface water, or groundwater are prohibited. Fourth, scientific understanding of the effects of exposure, especially by inhalation, to pollutants, especially in the form of organic compounds, is continuing to develop: with the use of chemicals increasing three fold in the 50 years preceding 1995 and approximately 80,000 chemicals in use in 2002, only a few hundreds of these chemicals have been subjected to long- or short-term study, resulting in the discovery that about 10% of the chemicals in use in 2002 were carcinogens. Transmission by dust appears to be limited by the frequent covering and spraying of the working faces. Although nearby residents complain of dust in their homes, the practices of the less-regulated Class III landfill cannot be extrapolated to the proposed Class I landfill. Thus, the prospect of dust transmission of chemicals contained in the fill received by the proposed landfill appears also to be slight. The use of untreated leachate as the spray medium to control the dust itself raises two risks, however. First, spraying leachate will release chemicals in aerosol. The potential range of aerosol is great, especially as the landfill ascends toward its design height of 190 feet. However, the risk of transmission by aerosol is reduced to insubstantial levels by adding a Permit condition that prohibits spraying during windy conditions. Second, depositing leachate on the landfill face will release chemicals through evaporation. The point of spraying the landfill face is to control dust between the addition of the waste materials to the pile and the application of the cover. Between these two events, dry conditions will sometimes intervene and may cause the evaporation of certain, but not all, pollutants. The leachate acquires pollutants as it percolates down the waste column and into the leachate collection system. As Dr. Teaf noted, the leachate becomes more concentrated as it recirculates, but, otherwise, this record is largely silent as to the likely composition of the recirculated leachate. However, for landfills accepting sludge, higher levels of mercury may be present in the leachate. As reported by the Florida Center for Solid and Hazardous Waste Management at the University of Florida, in a report issued March 2007, and titled, "Design and Operational Issues Related to Co-Disposal of Sludges and Biosolids and Class I Landfills--Phase III," one study found that the concentration of mercury in the leachate of landfills that receive sludge is almost three times greater than the concentration of mercury in the leachate of landfills that do not accept sludge. The same study reported that total dissolved solids and chlorides were present at greater concentrations at the landfills that did not accept sludge and that other parameters--unidentified in the cited article--were not significantly different between the two types of landfills. Republic proposes to recirculate substantial volumes of leachate--sufficient, for instance, to raise the moisture content of the fill from 25 percent to 28.9 percent. The Permit allows the proposed landfill to operate six days per week, for a total of 312 days annually. The Operation Plan prohibits the application of leachate during rain, but the number of days annually during which rain extends for the entire day is few, probably no more than a dozen. These numbers suggest that Republic may apply as much as 3.6 million gallons annually of untreated leachate to the landfill face. The 12,000 gallon-per-day limit and restrictions on head in the leachate collection and removal system effectively limit the quantities of leachate that may be recirculated, but the sole provision addressing leachate water quality is the annual monitoring event described above. Given the time required to analyze the many parameters included in the EPA regulation, for most of the year between tests, Republic will be applying over three million gallons of leachate whose pollutant concentrations will be completely unknown. Some assurances emerge, though, when considering air transmission of pollutants by class. In general, on this record, as to transmission by gas, there appears to be an inverse relationship between a compound's volatility, which is a measure of its ability to enter the air, and a compound's persistence. VOCs are one of the most dangerous classes of pollutants to public health and include such carcinogens as benzene, tolulene, xylene and, the most dangerous of all VOCs, vinyl chloride, which is released upon the degradation of such common substances as plastics, carpets, and upholstery. Biogas, which is generated by the anerobic decomposition of organic compounds in a landfill, contains mostly methane and carbon dioxide, but also significant levels of VOCs. When inhaled, the primary results of exposure to VOC are respiratory irritation and allergenic effects. Volatility is measured by vapor pressure, which is a measure of a chemical's ability to get into the air. As their name suggests, VOCs enter the air easily. They are also capable of traveling great distances due to their light molecule. However, VOCs are easily destroyed by sunlight and diluted by wind. Other organic compounds common to landfills are only semi-VOCs, such as PCBs. Although less volatile, these chemicals, too, are hazardous to public health--in the case of PCBs, in any amount. Due to this fact and their persistence in the environment, the United States has prohibited the manufacture of PCBs for over 30 years. However, not only are PCBs considerably less likely to enter the air than VOCs, they also travel shorter distances than VOCs due to a heavier molecule. Dr. Carpenter opined that there is little evidence that PCBs are an issue in the proposed landfill. Another class of organic compound, 1000 times less volatile than even PCBs, is phthalates, which are used in the production of plastics. Phthalates pose significant threats to public health, especially reproductive health. However, the exceptionally low volatility of this compound renders transmission by evaporation highly unlikely. Much of the regulatory framework imposed on landfill design, construction, and operation arises out of concerns for the control of human pathogens, which are infection-causing organisms, such as bacteria, viruses, protozoa, and parasitic worms. One of the great advances in human longevity in the United States occurred in the early 1900s--not with the development of antibiotics or improved medical care--but with the implementation of basic sanitation control and the removal of pathogens from the drinking water. For the proposed landfill, sludge will be the primary source of pathogens. Sludge is nutrient-rich organic matter, which will be received at the proposed landfill without any treatment except possibly dewatering. Even with the acceptance of sludge, the proposed landfill presents little risk for the transmission of pathogens. Pathogens communicate disease only when a person is exposed to an effective dose and are better transmitted by direct contact or animal than air. Bacterial pathogens are themselves killed by wind, as well as sunlight, temperature, and humidity differentials, so the preferred means of air transmission would be aerosol versus gas. The record permits no findings as to the persistence of pathogenic viruses, protozoa, and parasitic worms. However, as noted above in connection with the land transmission of pathogens, the immediate application of lime and cover to the sludge will tend to prevent the release of effective doses of pathogens by air, as well. The last major class of pollutant that could be transmitted by air is heavy metals, such as mercury or lead. Although these metals produce a wide range of neurological diseases and generally interfere with cognition and behavior, Dr. Carpenter admitted that heavy metals were not as much of a concern as VOCs, presumably due to their resistance to vaporization. Even though transmission by air is not as tightly controlled as transmission by water or land, for the four reasons noted above, there is little risk of transmission by air--i.e., dust, aerosol, or gas--when the specific properties of likely pollutants are considered. In all but five respects, then, Republic has provided reasonable assurance that public health will not be endangered by pollutants released from the landfill by water, land, or air. First, to provide reasonable assurance concerning public health, the Permit needs a condition that prohibits spraying leachate during windy conditions, which DEP may define as it reasonably sees fit. As noted in the Conclusions of Law, this is a requirement in the rules and, due to its importance, should be restated explicitly in the Permit, which restates numerous other rule requirements. Second, to provide reasonable assurance concerning public health, the Permit needs more frequent monitoring of leachate water quality, at least at the frequency, as noted in the Conclusions of Law, set forth in the rules. Large volumes of untreated leachate will be recirculated through the landfill. Even if aerosol transmission is controlled, transmission by evaporation of some pollutants, although not the heavy metals, is possible. Also, pollutants are concentrated in recirculated leachate and thus the consequences of transmission into groundwater or surface water, however unlikely, become greater. At the same time, the action leakage rate is generous--to Republic, not the groundwater. At 100 gallons per acre per day, Republic is not required to report to DEP possible liner leakage until about 7300 gallons per day are lost to the surficial aquifer. Suitable for the detection of catastrophic failures associated with most sinkholes, this action leakage rate is too high to trigger action for small liner leaks. If Republic is to be allowed this much leakage into the groundwater, it must identify the leachate's constituents and their concentrations at least semi-annually. Third, to provide reasonable assurance concerning public health, the Application must extend the right of split testing to all of the parties in these cases, if DEP fails to exercise its right to take a split sample. The spraying of untreated leachate and generous limit applied to liner leakage before reporting and remedial action are required underscore the importance to public health of independent leachate testing. There is no reason to allow budgetary constraints or administrative oversight to preclude Petitioners and Intervenor, who are uniquely situated to suffer from the escape of excessive pollutants in the leachate, from providing, at their expense, this independent leachate testing. Fourth, to provide reasonable assurance concerning public health, the Permit needs to restate accurately the language of the rules concerning the extent of knowledge required of Republic, if it is to be liable for the acceptance of certain prohibited wastes. Fifth, to provide reasonable assurance concerning public health, the Permit needs to be modified to ensure that at least one spotter, whose sole responsibility is spotting, will be assigned to each working face while the landfill is receiving waste. Sinkholes The sinkhole issue arises in the geotechnical analysis of the sufficiency of the foundation to support the considerable loads of a landfill and also in the stability of the side slopes of the landfill. This analysis starts with consideration of the geology of the area, of which Republic's property is a part, and, among other things, the potential for sinkhole formation in the area. The Cedar Trail Landfill lies within the Bartow Embayment and along the eastern slope of the Lakeland Ridge of the Central Lake District Physiographic Province. This embayment is a large erosional basin partially backfilled with phosphatic sand and clayey sand of the Bone Valley Member. At this location, the top of the Floridan Aquifer is formed by Suwannee Limestone, which consists of white to tan, soft to hard, granular, porous, very fossiliferous limestone with interbedded dolomite. This rock unit is 110-140 feet thick. Atop the Suwannee Limestone sits the Hawthorne Group, which comprises the Arcadia Formation, at the base of which is the Nocatee Member, which is a relatively impermeable sand and clay unit. Atop the Nocatee Member is the Tampa Member, which consists of hard, dense, sandy, locally phosphatic, fossiliferous limestone. The top of this member, which is the top of the Arcadia Formation, is locally referred to as the "bedrock complex," which marks the lower limit of phosphate mining. Atop the Arcadia Formation, still within the Hawthorne Group, sits the Peace River Formation, which consists of phosphatic clayey sand and clayey sand. The lower portion of the Peace River Formation is a relatively impermeable, undifferentiated clayey unit locally known as "bedclay." The Bone Valley Member of the Peace River Formation is mined for phosphate and is locally known as "matrix." Atop of the Peace River Formation are undifferentiated surficial soils, typically consisting of silty sand, clayey sand, and some hardpan and organic soils. These materials are locally known as "overburden." Phosphate mining is prevalent in the area, including, as noted above, much or all of the Cedar Trail Landfill site. Strip mining for phosphate normally removes the entire surficial aquifer, just into the bedclay. Mined areas are then backfilled with overburden spoil soils, clay, waste clay, and sand tailings. After backfilling, the soil strata bear little resemblance to premining strata. Sinkholes are prevalent in the general area surrounding the Cedar Trail Landfill. A sinkhole is a surface depression varying in depth from a few feet up to several hundreds of feet and in area from several square feet to several acres. Sinkholes are typically funnel-shaped and open broadly upward. Sinkholes form when weakly acidic groundwater creates cavities in the calcium carbonate within limestone. Soils above these cavities erode into the cavities. In the area that includes the Cedar Trail Landfill, cover-collapse and cover- subsidence sinkholes predominate among sinkhole types. A cover-collapse sinkhole, which is typically steep- sided and rocky, forms when cohesive soils over a limestone cavity can no longer bridge the cavity under the weight of overlying soil and rock. At this point, the cohesive soils suddenly collapse into the cavity. These are more common in the part of the state in which the Cedar Trail Landfill is located. A cover-subsidence sinkhole occurs due to the gradual lowering of the rock surface as solutioning occurs in the subsurface rocks. This type of sinkhole develops as subsurface soluble rock is dissolved and overlying soils subside into the resulting shallow surface depressions. Regardless of the type of sinkhole, borings into sinkholes will reveal zones of very loose soil sediments that have washed downward into the cavernous voids within the bedrock. This very loose soil zone is called a raveling zone, which starts at the limestone layer, as the overlying soils begin to collapse into the solution features within the limestone. As the loosening works its way upward toward the surface, it eventually results in the subsidence of the ground surface and formation of a sinkhole. Considerable sinkhole activity has taken place in the immediate vicinity of Republic's property. Most visibly, a sinkhole formed in 2006 in 285-acre Scott Lake, 4.5 miles northwest of the landfill. This sinkhole drained the entire lake and destroyed several structures. The Florida Geological Service sinkhole database, which consists of anecdotal reports of sinkhole activity, some of which are unverified, includes 49 sinkholes within five miles of the proposed landfill. Two documented sinkholes have occurred within .17 mile of the landfill--one of which is reported to be 125 feet in diameter and 80 feet deep. Based upon the information contained in the preceding paragraph, Clint Kromhout, a professional geologist with the Florida Geological Survey, opined on August 23, 2009, that the potential for sinkhole formation "within the proposed site and surrounding area" is "low to moderate." Mr. Kromhout does not provide a definition of "low," but part of his opinion is shared by the Golder Report, which agrees that the sinkhole potential on the proposed site is "low." The potential for sinkhole formation in the general area surrounding the proposed landfill, as distinguished from the site itself, is at least moderate. In their Proposed Recommended Order, Republic and Intervenor necessarily concede: "All parties acknowledge that the proposed landfill site is in a general region that has a relatively high frequency of sinkholes as compared with the rest of the state of Florida." It is misleading to characterize the area surrounding the proposed landfill as of low potential for the formation of sinkholes, unless there is another category, like "nonexistent." But characterizing the sinkhole potential of the surrounding area as moderate is not determinative of the likelihood of sinkholes at the landfill's footprint, nor is a site-specific geotechnical investigation mooted by such a characterization. Rather, characterizing the sinkhole potential of the surrounding area as moderate dictates the intensity and scope of the ensuing geotechnical investigation, if the investigation is to provide reasonable assurance of the structural integrity of the proposed landfill. Acknowledging moderate potential for sinkhole formation in the surrounding area, Republic has appropriately relied on three geotechnical reports, including three sets of boring data. The final of these reports, the Hanecki Report, is based on the collection and analysis of boring data, as well as a review of the data and analysis contained in the two earlier geotechnical reports, the Ardaman Report and Golder Report. The boring data reveal that the proposed landfill site features four units. Nearest the surface is Unit 1, which is brown to dark brown, medium- to fine-grained sand with minor amounts of clayey silt. Unit 1 is 0-10 feet thick. Next down is Unit 2, which is tan to gray, medium- to fine-grained sand with increasing silty clay or clayey silt. Unit 2 is 5-10 feet thick and generally marks the upper limit of fine-grained, granular soils (i.e., clayed sands and silty sands). Unit 3 is orange brown to yellow brown, gray and tan silty clay to clayey silt or fine sand and silty clay. Unit 3 is 5-15 feet thick. Unit 4 is gray and tan clayey silt or silty clay with minor amounts of fine sand. This material is very stiff or very dense, and most borings terminated in this unit. The few borings that penetrated this unit suggest that it may consist of dolomitic sandy clays and silts and dolomitic limestone to depths greater than 100 feet below grade. Units 3 and 4 generally mark the upper limits of low permeability/low compressibility soils. The Hanecki investigation comprised two main steps. First, Hanecki retained a subconsultant to perform electrical resistivity imaging (ERI) along 100-foot-wide transects run across the site. Any anomalies revealed by the ERIs were to be followed by standard penetration test (SPT) borings, which permit soil testing at predetermined intervals, as well as a measure of the compressibility of the soils. Compressibility is measured during the soil-testing intervals, during which the drill bit is replaced by a soil sampler. The driller records the number of blows required for a 140-pound hammer falling 30 inches to produce 12 inches of penetration. The value is expressed in N-values, where N represents the number of such blows. Looser soils produce lower N values. Another important piece of information obtained during SPT boring is the partial or total loss of circulation fluid during drilling. While the drill is penetrating soil, a slurry circulates through the borehole to prevent the collapse of the sides of the hole. This slurry is recycled during drilling, but, if the drill encounters a void, all or part of the circulation fluid is lost. The ERI survey revealed no real anomalies because of a narrow range of resistance values. However, taking relatively small differences in resistivity as an anomalies, Hanecki identified 14 features of interest. At each of these locations, Hanecki performed an SPT boring. Because the ERI transects were unable to span the two onsite ponds, Hanecki added two locations for SPT borings adjacent to each side of each pond, for a total of four additional SPT borings. At the request of DEP, Hanecki added a nineteenth SPT boring at Golder site G-11, which had revealed low N-values during Golder's borings. Hanecki extended the borings into "refusal" quality soil, which was defined as soils requiring more than 50 blows of the 140-pound hammer to achieve six inches or less of penetration. All of Hanecki's SPT borings encountered very hard limestone. Among the most significant findings of Hanecki's borings, only one boring, G-11, experienced any circulation fluid loss, and this was estimated at 50 percent. However, it is more likely that this partial circulation fluid loss is due to loosely deposited sands than a void that might be indicative of conditions suitable for sinkhole formation. Not all circulation losses indicate voids that that will result in sinkhole formation. Also significant among Hanecki's findings is a clayey soil, or bedclay, at every SPT boring, which severely limits hydraulic recharge to the limestone. By impeding vertical migration of surface and shallow subsurface water to the limestone layer, this bedclay "greatly inhibits limestone erosion." This bedclay also supports the looser soils above the bedclay and thus prevents raveling, without which sinkholes cannot form. Two borings--G-11 and F3-1--lacked a layer of Unit 3 or 4 soil above the limestone, but Hanecki concluded that the Unit 2 layers above the limestone at these locations contained sufficient clay or clayey sand to serve the same functions of impeding the downward movement of groundwater and preventing the downward movement of loose soils. This conclusion appears reasonable because Unit 2 is the uppermost reach of the finer- grained materials, of which clays and silts are examples when compared to sands. There is obviously some variability in the distribution of finer- and coarser-grained materials within each occurrence of Unit 2 soils. Hanecki's findings indicated intervals of loose soils, sometimes at depth, which typically would suggest raveling zones. At the proposed location, though, these findings do not support raveling due to the underlying bedclay layer and the history of mining, which probably introduced looser soils typically found closer to the surface through the entire 40-foot depth of the mine cut. Based on these findings, the Hanecki Report concludes that, regardless of at least moderate potential for sinkhole potential in the area, the footprint of the proposed landfill has an acceptably low risk of sinkhole development to permit development of the proposed landfill. This is a reasonable conclusion because it is supported by the data collected by Hanecki and his reasoned analysis of these data. Hanecki's conclusion is also supported by the data and analysis contained in the Golder Report and Ardaman Report, which are based on an additional 84 SPT borings, post- reclamation. Only about 12 percent of these SPT borings reached the limestone, and they cover all of Republic's property, not merely the footprint of the proposed landfill. Even so, these borings confirm two important findings of the Hanecki Report. First, they produced data indicative of an extensive bedclay layer intact on Republic's property. Second, the Ardaman and Golder borings reveal only two or three instances of partial circulation loss that, like the sole occurrence of partial circulation loss in the Hanecki borings, are located on Republic's property, but outside the footprint of the proposed landfill. Republic has provided reasonable assurance that the site will provide an adequate foundation for the proposed landfill and sinkholes are unlikely to undermine the structural integrity of the proposed landfill.

Recommendation It is RECOMMENDED that the Department of Environmental Protection enter a final order granting the Construction Permit and Operation Permit, but only if the Operation Permit is modified by the addition of the five items identified in paragraphs 172, 174, 175, 181, and 187. DONE AND ENTERED this 8th day of October, 2010, in Tallahassee, Leon County, Florida. S ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of October, 2010. COPIES FURNISHED: Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Tom Beason, General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Mimi A. Drew, Secretary Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Ronald L. Clark, Esquire Clark, Campbell & Mawhinney, P.A. 500 South Florida Avenue, Suite 800 Lakeland, Florida 33801-5271 William D. Preston, Esquire William D. Preston, P.A. 4832-A Kerry Forest Parkway Tallahassee, Florida 32309-2272 Jennings Kemp Brinson, Esquire Clark, Campbell & Mawhinney, P.A. 500 South Florida Avenue, Suite 800 Lakeland, Florida 33801 Sean R. Parker, Esquire Boswell & Dunlap, LLP 245 North Central Avenue Bartow, Florida 33830-4620 Ralph A. DeMeo, Esquire Hopping, Green, & Sams, P.A. 119 South Monroe Street, Suite 300 Tallahassee, Florida 32301 Stanley M. Warden, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Paula L. Cobb, Esquire Hopping Green & Sams, P.A. Post Office Box 6526 Tallahassee, Florida 32314 John W. Frost, Esquire Frost Sessums Van den Boom & Smith, P.A. Post Office Box 2188 Bartow, Florida 33831 John Stanley Fus Highland Lakes Estates HOA 2190 Boardman Road Bartow, Florida 33830

CFR (4) 40 CFR 25840 CFR 261.2440 CFR 261.4(b)(1)40 CFR 60 Florida Laws (4) 120.569120.57403.703403.707
# 9
CROSS TIE MOBILE ESTATES SUB-DIVISION vs BIO-MED SERVICES, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-007381 (1990)
Division of Administrative Hearings, Florida Filed:LaBelle, Florida Nov. 26, 1990 Number: 90-007381 Latest Update: Apr. 29, 1992

Findings Of Fact On or about August 4, 1990, Bio-Med Services, Inc., (hereinafter "BMS") submitted to the Department of Environmental Regulation (hereinafter "DER"), an application for the construction of a biohazardous waste incineration facility (hereinafter "facility") to be located on approximately 5.5 acres in the City of LaBelle Industrial Park. The application was prepared, signed and sealed by Robert A. Baker, Professional Engineer, and was signed by Gary V. Marsden, president of BMS. BMS is a wholly owned subsidiary of Bio-Med Management, Inc., (hereinafter BMM), and was formed for the express purpose of making application for construction of the facility at issue in this case. Gary V. Marsden has held the position of president of BMS for approximately one and one-half years. Prior to becoming BMS president, Gary Marsden was a telephone equipment salesman. Gary Marsden's father, Clarence, is president of BMM, and a director of BMS. The BMS business plan indicates that Clarence Marsden was integral to the formation of BMS, was the primary contact between BMS and engineer Baker, and will act as salesman for BMS. Clarence Marsden has been convicted approximately four times on felony counts related to illegal drug activities. Neither Marsden has any experience related to construction or operation of biohazardous waste incineration facilities. According to the first application, the incinerator facility will utilize two "Consumat-1200" incinerators and one "U-Burn 12060" incinerator. 1/ The Consumat-1200 units are each capable of incinerating approximately 2,000 pounds of waste hourly. The U-Burn incinerator is capable of incinerating 250 pounds of waste hourly. The total waste incineration capacity of the facility is approximately 50 tons daily. The waste to be incinerated consists of biological and biohazardous wastes, primarily from hospitals and medical offices. The facility would not be authorized to incinerate hazardous or radioactive wastes. The application seeks approval to construct an incinerator facility which could operate 24 hours daily, seven days weekly, on a year-round basis. Although the incinerators would be shut down for maintenance and repairs, the applicant hypothesized the constant operation of the facility for the purpose of predicting emissions levels. The air pollution control (hereinafter "APC") system proposed in the first application includes venturi scrubbers, caustic scrubbers, and a 50 foot tall, 30 inch diameter discharge stack. On or about April 19, 1991, BMS submitted amendments to the first application. The amendments, (hereinafter the "second application") were prepared and signed by Mr. Baker. The amendments deleted the venturi scrubbers/caustic scrubbers and substituted dry hydrated lime injection scrubbers and baghouses. The amendments also altered the discharge stack dimensions to provide for a stack height of 65 feet and a diameter of 40 inches. The second application also included a bypass stack to provide for APC system malfunctions. Such bypass stacks provide for uncontrolled discharge of emissions into the atmosphere, when such emissions could further damage a malfunctioning APC system. On or about September 24, 1991, an application was submitted by Eastern Grading, Inc. 2/ for a permit to construct a biohazardous waste incineration facility to be located on a site outside the City of LaBelle, rather than at the LaBelle Industrial Park. According to the third application, the incinerator facility still proposes to utilize two "Consumat- 1200" incinerators and one "U-Burn 12060" incinerator. The third application deleted the bypass stack system intended to handle emergency situations and substituted a proposed crossover mechanism. The Eastern Grading application, (hereinafter the "third application") prepared and signed by Mr. Baker and signed by Gary Marsden as president of Eastern Grading, Inc., is the application at issue in this proceeding. Subsequent to the filing of the third application, BMS has now abandoned plans to locate the facility on the site identified in the third application and instead seeks approval to construct the biohazardous waste incineration facility at the LaBelle Industrial Park site identified in the first application. The proposed site for the facility is located approximately 4,900 feet from the City of LaBelle Public Water Treatment Facility. The raw water supply comes from shallow wells southwest of the city, and is stored at the treatment plant in open holding areas. After sand-filtering and softening, the water is stored in vented tanks. Based upon the proximity of the water treatment plant to the incineration site, there is high potential for impact on the local water supply by the emissions discharged from the incineration facility. The site of the proposed facility is located next to the Cross Tie Mobile Home Estates Subdivision, approximately 75 feet from the closest residence, approximately 2,000 feet from a senior citizen service center, and approximately 3,700 feet from a local nursing home. It is likely that some individuals in the nursing home may be regarded as particularly health sensitive, as are a number of residents of Cross Tie Mobile Home Estates Subdivision who suffer from respiratory illnesses and who testified during the proceeding. The site is approximately 4,600 feet from a local elementary school, approximately 4,400 feet from an intermediate school, approximately 7,400 feet from a middle school, and approximately 8,600 feet from a high school. Persons with existing respiratory illnesses, elderly persons, and children are regarded as "sensitive receptors" and are substantially more at risk through exposure to airborne chemical pollutants than is the general population. Based upon the proximity of the incineration site to such sensitive receptors, there is high potential for impact on such persons by the emissions discharged from the incineration facility. There was no site-specific analysis of the proposed facility done by either the applicant during preparation of the application or by the DER during review of the proposal. The applicant has provided no data related to potential heath risks posed by the proposed facility. The DER has not specifically analyzed such health risks. The third application states that various requirements of the Department will be met. The application provides as follows: "Each incinerator will have the following equipment and operational requirements in order to comply with the requirements of FAC 17-2.600: Particulate emissions will not to (sic) exceed 0.020 grains per dry standard cubic foot (gr/dscf) corrected to 7% oxygen (O2). Hydrochloric acid (HCI) emissions to be reduced by 90% by weight on an hourly average basis. At least one second residence time at no less than 1800 F. in the secondary combustion chamber. An air lock system designed to prevent opening the incinerator doors to the room environment and to prevent overcharging. Carbon monoxide (CO) concentrations in the stack exhaust gases of less than 100 PPMv, dry basis, corrected to 7% 02 on an hourly basis. The secondary combustion chamber to be preheated to 1800 F. prior to burning and maintained at 1800 F. or greater during active burning of wastes. All incinerator operators will be trained by Consumat Systems or another qualified training organization. A training plan for the operators will be submitted to the Florida Department of Environmental Regulation (FDER) prior to the start of operations. Continuous monitoring and recording of temperatures and oxygen will be maintained at the exit of the secondary combustion chamber. Operating procedures and calibration requirements will be submitted to FDER upon selection of monitoring equipment. All air pollution control equipment will be functioning properly during operation of the incinerator system. The list of assurances set forth above are a recitation of the requirements of the DER's rules as provided at Chapter 17- 2.600, Florida Administrative Code. The evidence as to specific equipment and operational requirements is insufficient to support the assertion that the facility will meet such standards. As the applicant's professional engineer, Mr. Baker signed and sealed a statement as follows: This is to certify that the engineering features of this pollution control project have been examined by me and found to be in conformity with modern engineering principles applicable to the treatment and disposal of-pollutants characterized in the permit application. There is reasonable assurance, in my professional judgement, that the pollution control facilities, when properly maintained and operated, will discharge an effluent that complies with all applicable statutes of the State of Florida and the rules and regulations of the department. It is also agreed that the undersigned will furnish, if authorized by the owner, the applicant a set of instructions for the proper maintenance and operation of the pollution control facilities and, if applicable, pollution sources. Mr. Baker's certification relates only to his opinion that the facility, properly operated and maintained, will be capable of compliance with Chapter 17-2.600, Florida Administrative Code. The engineering and design of the incineration facility have not been completed. The application states, without qualification, that the two Consumat units will be utilized. The remaining equipment, including the entire air pollution control system, is identified by type of component, but is otherwise not specified. Where equipment specifications are provided, such specifications are qualified by language stating that the equipment installed will meet either such specifications "or their technical equivalents". No actual operating or test data related to any of the equipment or systems proposed for use is included in the application. There is no reliable operating or test data applicable to biohazardous waste incineration facilities available for this particular configuration of components. The application fails to contain sufficient information related to "engineering features" to permit a credible determination as to whether or not the incineration facility will conform with modern engineering principles. The application fails to support Mr. Baker's assertion that reasonable assurances are provided that when properly maintained and operated, the facility will discharge an effluent that complies with all applicable statutes of the State of Florida and the rules and regulations of the DER. Although there is no evidence to establish that the applicant intends not to comply with the requirements of the DER's regulations, the application, reflecting the fairly preliminary design of the incineration facility, fails to provide sufficient information to assure that, once final design decisions are made and the equipment acquired, that such equipment will be compatible and configured in a manner which assures compliance with the DER's acceptable emissions regulations. The applicant has no experience in construction or operation of such incineration facilities. There is no other existing and operating biohazardous waste incineration facility using this configuration of air pollution control equipment. Mr. Baker contends that the completion of final design plans and specifications is a relatively straightforward process, but nonetheless, it has not been done. The Consumat incinerators have already been purchased, are used equipment, and were subject to a cursory inspection conducted by a BMS investor prior to purchase and transportation of the used equipment from the original owner in South Carolina. There is no evidence that structural inspections by a qualified metallurgist are contemplated. The Consumat units are starved-air incinerators. A starved air incinerator consists of two chambers, one primary and one secondary. The inflow of air into the primary chamber is controlled to provide for partial combustion and volatilization of wastes. The maximum temperature of the primary chamber is 1400 degrees F. The gases produced in the primary chamber flow into the secondary chamber where the temperature is maintained through gas burners. The minimum temperature in the secondary chamber is 1800 degrees F. The application provides that the waste gases will remain in the secondary chamber for two seconds. Control of temperature and residence time is the secondary chamber is required to complete the combustion process. The draft permit conditions require the applicant to install, maintain and operate continuous emissions monitoring equipment to record the secondary combustion chamber's exit temperature and oxygen level. Each incinerator will have an oxygen probe and a thermal couple at the secondary chamber exit. The oxygen probe will provide data needed to ascertain whether the combustion process is adequate and permits the correction of oxygen levels to the 7% standard required to measure emissions levels. The thermal couple permits the monitoring of exit temperatures. The draft permit also requires BMS to maintain all testing measurements and calibration data, and other information related to equipment maintenance and adjustments. The Consumat units must be retrofitted to permit the residence time and temperature indicated in the application. The application does not contain design or engineering information related to retrofitting the secondary chambers. The U-Burn unit is, according to professional engineer Baker, a "very unique design of a company that's no longer in existence." The U-Burn would be operated only in conjunction with one of the Consumat units. One Consumat and the U-Burn would each have a separate connection into one of the two APC systems. The application provides no design or engineering data related to the connection of the U-Burn unit into the APC system. The application states that the incinerators will be loaded by means of an enclosed ram feed mechanism which will prevent the incinerator from being opened to the room environment and prohibit overloading of the unit. The enclosed ram feed mechanism has not yet been designed. Two parallel lines of identically sized pollution control equipment are proposed, each line designed to meet the requirements of one Consumat unit and the U-Burn unit. Each line of equipment will include a preconditioner ("quencher"), a lime injection dry scrubber, and a fabric filter baghouse. To control emissions, it is necessary to reduce the temperature of gases exiting the secondary chamber, where the minimum temperature is 1800 degrees F. According to the "Process Description" in the application, the gas stream will be preconditioned by the use of water injection to lower the gas stream temperature to 275 degrees F. The water from the preconditioning process will be evaporated as part of the exhaust gases. The preconditioner will be lined with refractory material to withstand the extreme temperature. The application contains preliminary design specifications for the preconditioner, however the application states that such specifications "or their technical equivalents" will be utilized in the final design, accordingly such specifications are subject to change. There has been no more than preliminary design and engineering work completed for the construction and operation of the preconditioner. The application states that the dry hydrated lime injection system (dry scrubber) and the fabric filter system have been designed to meet the requirements of Chapter 17-2.600 F.A.C. for particulate matter and HCI emissions control. Upon leaving the preconditioner, cooled flue gases move into the dry scrubber. According to the "Process Description" in the application, an ultra- fine, dry hydrated lime (calcium hydroxide) will be injected into the preconditioned gas stream via a metered pneumatic system inside a reactor. Although the velocity of the injection must be sufficient to ensure that the dry lime mixes thoroughly with the flue gases, the application contains no information related to expected injection velocity. Once mixed, the lime reacts with hydrochloric acid to produce calcium chloride. The dry scrubber will collect large particulate matter and will have an airlock system for removal of collected solids. The lime injection rate will be at a minimum of 30% greater than the stoichiometric requirements for the neutralization of the HCI. This system is intended to remove at least 90% of the HCI in the gas stream. The application contains preliminary design specifications for the dry scrubber, however the application states that such specifications "or their technical equivalents" will be utilized in the final design, accordingly such specifications are subject to change. No more than preliminary design work for the construction and operation of the dry scrubber has been completed. Following dry scrubber treatment, the flue gases proceed to a reverse jet fabric filter baghouse. Baghouse technology is a relatively standard methodology of controlling submicron particulate matter (and dioxins/furans condensed on such matter) and heavy metal vapors. According to the "Process Description" in the application, the reverse jet fabric filter will have a maximum air to cloth ratio of 5 to 1. 3/ Under some conditions, a 5 to 1 air to cloth ratio may result in the filter bags becoming clogged with ultrafine particulates. The baghouse is intended to have a removal efficiency of greater than 99% for submicron particulate matter. The application contains preliminary design specifications for the baghouse, however the application states that such specifications "or their technical equivalents" will be utilized in the final design, accordingly such specifications are subject to change. A substantial amount of manufacturer literature related to dry scrubbers, baghouses (including the fabric filter bags), and emissions monitoring equipment is included in the application, but is of no probative value given that the applicant has not committed to using any of the equipment for which literature is included. The application indicates that the incineration facility will include a "crossover" between the two APC systems, to provide for the possibility that one APC system could fail. During such "upset" conditions, there is a substantial potential for visible and fugitive emissions, as well as odors and smoke. The applicant has not yet designed the crossover mechanism and has no information related to the actual planned operation of a crossover mechanism. Standard incinerator design provides for the utilization of bypass stacks which permit the discharge of uncontrolled emissions upon the failure of an APC system. The crossover theoretically would shift the discharge from one incinerator's failed APC system to the second incinerator's APC system, during which time the operation of the second incinerator unit would be reduced or would cease in order to provide adequate capacity in the operating APC system for the discharge from either or both operating incinerators. The application does not provide information related to the operation, design or location of the crossover mechanism. There is no information as to how the facility would address the potential situation where, with only one incinerator and APC system operating, an APC system failure would occur. The utilization of the crossover mechanism is unique, there being no similar medical waste incineration facility crossovers in use elsewhere. It is not possible to determine, given the lack of detail in the application, whether the crossover mechanism could be expected to adequately and successfully address potential "upset" situations. The site plan identifies two buildings on the site, one for incineration operations and the second for ash storage. There is no information supplied related to the location or storage of delivered, but unincinerated, biohazardous wastes, although, if the site plan is accurate, such storage apparently occurs within the incineration building. The application states that solid wastes (ash and lime) will be collected and disposed of off-site in an approved landfill. At hearing, BMS submitted an ash residue management plan, providing the applicant's plan to manage ash from the incinerators and the baghouse discharge. The plan was not signed or sealed by the applicant's professional engineer although he attested to the plan at hearing. According to the plan, incinerator bottom ash generated by the facility "will be handled in a manner which will prevent danger of contamination or release to the environment". Ash will be removed from "the consumat Model CS 1200 incinerator" 4/ unit by means of an ash ejection ram and collected in a wet sump, designed to eliminate dust and blowing ash. The wet ("quenched") ash is removed from the water-filled sump by a drag chain from which excess water will drain for reuse in the ash sump. The wet ash will exit the building by conveyer and be deposited into a covered, metal, "roll-off"-type, water tight storage container. When full, the container contents will be sampled and a representative sample provided to a DER-approved laboratory for Toxicity Characteristic Leaching Procedure ("TCLP") analysis. The container will thereafter be sealed, and the ash trucked to an approved disposal facility. Baghouse waste will include fly ash and reagent waste related to the dry scrubber treatment. Such waste will be removed through a bottom drop hopper discharging into 55 gallon drums. The hopper/drum system will be shielded to prevent waste escape into the atmosphere. Upon filling, the drums will be sampled for the TCLP analysis and then sealed and transported to the approved disposal site. The BMS Ash Residue Management Plan also states: "Type A class waste will be disposed of by Waste Managements, Inc., at their facility located at 3000 N.W. 48th Street, Pompano Beach, Florida 33073. In the event ash residue would not be classified as Type A waste, it will be disposed of by Chemical Waste Management, Inc., whose offices are also located at 3000 N.W. 48th Street, Pompano Beach, Florida 33073." The Ash Residue Management Plan is insufficient to comply with the DER's requirement related to such plans. The plan fails to indicate the capacity of the disposal site or whether the disposal site is intended to receive ash residue from the solid waste combustor for the life of the facility. The plan is ambiguous as to whether the identified sites are actual disposal sites or are offices of the company which will allegedly handle disposition of the ash. The plan fails to address the beneficial uses, if any, of ash residue, although the plan does state that ash recycling is not anticipated. The plan fails to identify contractual requirements, or notification and inspection procedures, which assure that hazardous wastes are not received or burned in the facility. Although the plan states that the incinerator ash will be placed into a wet sump to eliminate dust and blowing ash, and that wet sump water will be recycled into the sump, the plan fails to address the cumulative effects such water reuse and the potential impact of exposure to humans or the environment. As to the baghouse hopper/drum system (shielded to prevent waste escape into the atmosphere) the plan fails to consider other pathways of human or environmental exposure such as through direct contact or ingestion, and the potential for soil and ground water contamination. The application states that any liquids generated from wash-downs and cleaning operations will be collected in a holding tank and thereafter incinerated. The application contains no design or engineering data which identifies the means for incinerating such liquids or establishes that such liquid incineration will be accomplished in a manner which will not adversely affect incinerator or APC operation. Petitioners assert that the facility is experimental in nature because the design is rudimentary and the crossover mechanism is not used in medical waste incinerators of this type. Respondents assert that the facility is not experimental, and that the various types of equipment proposed are in use at other incineration facilities elsewhere. The evidence fails to establish that the entire facility should be properly identified as "experimental", however, there is no credible test data available for a facility utilizing this proposed combination of equipment in the configuration identified in the application. It is likely to expect a biohazardous waste incinerator to emit multiple air pollutants. Such pollutants include particulate matter and hydrogen chloride (HCI), as well as toxic pollutants such as arsenic, cadmium, chromium, lead, mercury, manganese, nickel, zinc, and dioxin equivalents. As to toxic pollutants, the DER reviewed the anticipated chemical emissions of arsenic, mercury, manganese, cadmium, chromium VI, nickel, zinc, lead, tetrachlorodibenzo dioxin (TCDD), and hydrochloric acid. The draft permit in this case requires the proposed facility to conduct emissions tests for particulate matter, hydrogen chloride, oxygen and carbon monoxide within 60 days of initially operating the facility, and to conduct annual emissions tests thereafter. At hearing, the applicant agreed to monitor emissions for the toxic pollutants arsenic, cadmium, chromium, lead, mercury, manganese, nickel, zinc, and dioxin equivalents, and further agreed to continuously monitor carbon monoxide and opacity. The DER has established a policy related to the control of toxic emissions from an air pollution source. The "Air Toxics Policy" is an effort by the DER to protect public health from the potential dangers posed by inhalation of excessive levels of toxic air emissions. The DER has a working list of 756 chemicals for which acceptable emission levels have been established. In identifying chemicals for inclusion on the working list, the DER utilized sources which referenced chemicals of concern and also reviewed data related to the air toxics programs of other regulatory agencies. The DER air toxics working list suggests acceptable ambient air concentration levels for the identified toxic chemicals. The acceptable levels are identified as "no threat levels" or "NTL's" and are set forth at average eight hour, 24 hour, and annual concentration levels. The DER asserts that the NTL's are conservative figures and that adverse public health consequences are unlikely to occur when ambient concentration emission levels do not exceed the NTL's. In establishing the average eight and 24 hour concentration NTL's, the DER utilized the more conservative of figures available from either the federal Occupational Safety and Health Administration (OSHA) or the American Conference of Governmental Industrial Hygienists (ACGIH). The OSHA and ACGIH figures are applicable to exposure of a healthy employee to a single chemical for an eight hour working period. The annual NTL's are directly based on EPA health data values listed in the EPA's Integrated Risk Information System. Of the three NTL's, the EPA- based annual levels are considered to be more accurate. In situations where the eight and/or 24 hour averages are exceeded, additional consideration is given to whether the annual NTL is also exceeded. The DER has not reviewed the data upon which the EPA, OSHA and ACGIH levels rely, and has not independently reviewed the statistical methodology utilized by the EPA, OSHA and ACGIH in calculating the cited agencies acceptable emissions levels. However, the weight of the testimony in support of the methodology, absent specific evidence to the contrary, establishes that such reliance is reasonable. In attempting to establish eight and 24 hour NTL's for use in the DER's Air Toxics Policy, the DER considered the likelihood that air emissions would contain multiple toxic chemicals and would impact a less healthy population (including particularly susceptible individuals) for an extended period of time. The DER reduced the eight hour OSHA/ACGIH concentration by two orders of magnitude, resulting in DER eight hour NTL's which are 100 times less than the OSHA/ACGIH levels. The DER further reduced the 24 hour OSHA/ACGIH levels by a factor of 4.2 (based upon dividing the total hours in a seven day period by a 40 hour work week) resulting in DER average 24 hour NTL's which are 420 times less than the OSHA/ACGIH acceptable occupational levels. Petitioners assert that the uniform safety factors calculated by the DER which resulted in the reduction of OSHA/ACGIH figures to the DER NTL's are arbitrary, and that some NTL's were likely too high and others were too low. However, Petitioners did not identify any of the 756 chemical NTL's on the DER working list as inadequate or excessive. The greater weight of the evidence establishes that the DER's utilization of a two magnitude safety factor is appropriate. Based upon the lack of adverse health impacts on the working population subject to OSHA/ACGIH occupational levels, the dearth of toxicological data available for most substances of concern, and absent evidence to the contrary, the inclusion of safety factors which result in an average eight hour NTL 100 times less than the OSHA/ACGIH levels and an average 24 hour NTL 420 times less than the OSHA/ACGIH levels is a reasonable attempt to prohibit excessive emissions and protect the general public's health from dangers posed through inhalation of such toxic air emissions. The DER annual average air toxic concentration levels are directly derived from EPA data and are distinguished on the basis of whether or not a substance is a carcinogen. For carcinogens, the NTL is based upon a unit risk factor which equates to a one in one million increased risk of developing a cancer related to said chemical. For non-carcinogens, the DER NTL is based upon an "inhalation reference concentration" which relies directly upon inhalation toxicity data, where such data is available. Where "inhalation reference concentration" data is unavailable, the DER NTL is based upon an extrapolation of oral toxicity data. The evidence fails to establish that the reliance of the DER on such EPA data is inappropriate or unreasonable. The DER utilizes the air toxics working list to compare anticipated emissions from a proposed air pollution source to the NTL's. Not all 756 chemical comparisons are made in every case. The comparison is for the purpose of determining whether additional inquiry should be made related to specific chemical emissions. The instant application includes predicted emission rates supplied by engineer Baker. The Baker estimates are based upon actual uncontrolled incinerator emission test results, to which a predicted "control efficiency" was applied for each type of control technology proposed in the application. The control efficiency predictions were based upon a noncommercial Canadian pilot project utilizing a dry-scrubber/baghouse combination, on non peer-reviewed literature and, as to mercury emissions, on a telephone conversation with a representative of the municipal waste industry. At the hearing, Petitioners utilized a data base compiled by Dr. Paul Chrostowsky, who supplied emissions estimates based upon his data base. The data base consists of actual test results from incinerators (including 12 medical waste incinerators) and from peer-reviewed literature. None of the facilities in the Chrostowsky data base reflect data from facilities utilizing a dry scrubber/baghouse system. Half of the incinerators in his data base utilized no controls, one utilized a baghouse, and the remaining five utilized wet scrubbers. Dr. Chrostowsky took the average emissions levels and added one standard deviation to account for uncertainty related to the lack of an operating record for the proposed facility. The emissions estimates produced by Dr. Chrostowsky are deemed to be more reliable and are credited. Dr. Chrostowsky opined that the applicant's estimates did not reflect likely operating conditions and were unreasonably low. According to his estimates, the application underestimated emission rates for hydrogen chloride, arsenic, cadmium, lead, manganese, mercury, and nickel. He also opined that the application's predicted mercury removal rate of 94% was excessive and that a removal rate 70% would be more likely. However, even given Dr. Chrostowsky's emissions levels, only the 24 hour NTL for hydrogen chloride is exceeded. Although Dr. Chrostowsky's calculated an exceedance of the annual average HCI NTL, the calculation was based on error. Other emissions remain at levels below the DER's level of acceptable emissions established by rule. Utilization of a 70% mercury removal rate still results in mercury emissions within the DER's range of acceptable emissions. As to Dr. Chrostowsky's estimated hydrogen chloride emission in excess of the DER's 24 hour NTL, such calculation appears to have been based on the application's estimated HCI control efficiency of 90%. The application utilized a conservative figure based upon the DER minimum requirement of 90% HCI control, when the actual HCI control efficiency could likely be greater than 90%. However, given the preliminary state of design and the lack of test results and data reflective of this particular equipment configuration, the evidence is insufficient to determine with reasonable assurance that such requirement will be met, or that the 24 hour HCI NTL will not be exceeded. It should be noted that the DER's NTL's address only potential human impact through inhalation, on the assumption that the most likely human ingestion for air emissions is through inhalation. The policy does not address human consumption of toxics though contaminated water supplies or via other pathways, Given the proximity of the proposed facility to local water supplies, the potential for other ingestion impacts exists, and should be examined. The application also included the results from engineer Baker's air dispersion modeling, performed to predict local concentrations of certain pollutants in the ambient air. The results indicate that maximum one, eight, and 24 hour concentrations will occur approximately 100 meters from the stack, and that maximum annual average maximum concentrations will occur approximately 500 meters from the stack. Mr. Baker first utilized a standard screening model developed by the federal Environmental Protection Agency specifically for this purpose. Mr. Baker is not an expert in computer modeling and utilizes standard EPA programs to perform such functions. If an initial comparison demonstrates that expected emissions from a proposed pollution source exceed an NTL, additional review of anticipated emissions is conducted to determine whether the initial review data is inaccurate or, if not, whether additional APC technology is required to control the excess emission. The use of an initial screening model is standard scientific practice and is reasonable. Mr. Baker uses the screen model to determine whether there are exceedances of any relevant emissions standards. Where no exceedances occur, it is generally unnecessary to perform further modeling. The Baker screen model relied upon hypothetical meteorological data unrelated to the meteorological variables at the proposed incineration facility site. The screen model results are regarded as an estimation of maximum one hour air pollutant concentrations at or beyond a property line. A set of conversion factors is applied to the maximum one hour air pollutant concentration with the results predicting eight hour, 24 hour, and annual concentrations. According to Mr. Baker's screen model results, the proposed facility's emissions did not exceed the DER's air quality standards or the NTL's in the working list. Mr. Baker subsequently utilized a more advanced EPA model, identified as the "Industrial Source Complex" (ISC) model, which projects both short-term and long-term concentrations. Mr. Baker opined that the ISC model provides a more accurate estimation of pollutant dispersion into the atmosphere. In running the model, he relied upon National Weather Service (NWS) surface meteorological data from Fort Myers and on NWS upper air meteorological data from Tampa, (as the DER had directed) and upon default EPA options. The NWS data included five years of weather information. Based on the ISC model, Mr. Baker anticipates that the emissions will not exceed the DER's air quality standards or NTL's. Meteorological conditions in LaBelle may differ significantly from the NWS Tampa upper air meteorological data. Tampa is much closer to the Gulf of Mexico than LaBelle. Lake Okeechobee, located nearby to the east of LaBelle, may impact LaBelle's local conditions. There is no reliable LaBelle meteorological data easily available, and the DER did not require collection of such site-specific data. Although an expert witness opined that, based upon Orlando's inland location, available Orlando NWS upper air data would be more representative of LaBelle conditions than the Tampa data used, the witness utilized the Tampa data to run his models. There is no actual evidence that utilization of Orlando data would have resulted in different pollutant dispersion modeling results than those included in the application. On behalf of the Petitioners, the ISC model was run utilizing the same weather data used by Mr. Baker and the emissions projections calculated by Dr. Chrostowsky, resulting in substantial agreement between the modeling results. Petitioners suggest that the applicant should have been required to provide data related to the dispersion of air pollutants during certain specific meteorological events, such as temperature inversions. Such inversions occur when warm upper air traps the cooler air below, and holds air pollutants close to the Earth's surface. Although the evidence related to such inversions is based upon a one-year frequency of fog incidence for Ft. Myers, Tampa and Orlando (rather than an analysis of temperature and air pressure data) temperature inversions may occur in LaBelle as often as 20 or more times annually. Utilization of a five year set of NWS data would include occurrences of temperature inversions. Fumigation concentrations occur when, during the dissipation of temperature inversions, the cooler and warmer air levels mix, and pollutants concentrations at the top of the cooler air level may be pulled down resulting in short, but intense, concentrations of pollutants at ground level. It is likely that fumigation events occur in the LaBelle area. Stagnation events are similar to fumigation events, although apparently affecting a larger geographic area than does a fumigation event. It is likely than stagnation events occur in the LaBelle area, however, there is no model which simulates a stagnation event. The screen model utilized in this case by the DER does simulate a fumigation event. According to the screen model predictions, maximum pollutant concentrations would occur under neutral stability conditions, not during fumigation events. The DER utilized the ISC model to predict small particle deposition ("fallout"). Fallout is specific to the meteorology of a site. The ISC model does not accurately predict fallout and such modeling is not required by the DER's regulations. However, such information, if available, could provide useful particle deposition data, given the proximity of the site to the City of LaBelle public water supply. Petitioners assert that the DER should have required a full risk assessment to determine the facility's potential for adversely affecting the local environment and residents in the area. A limited assessment, solely related to dioxin risks and acid gas risks, was performed on behalf of the Petitioners. The evidence is insufficient to establish whether or not the proposed incineration facility will result in an adverse health risk to the general population residing in the area, but given the location of the proposed facility and proximity to the local water supply and to sensitive receptors, the completion of a full risk analysis is warranted. As to dioxin levels, the limited risk assessment estimated that the BMS facility would produce a cancer risk ten to 100 times greater than the risk associated with Lee County's proposed nonbiohazardous waste incineration facility. However, the predicted dioxin emission levels are within the range established by the EPA as acceptable. The Petitioner's expert further opined that such EPA figures overestimate the cancer potency of dioxin. An acid gas analysis was performed utilizing the "hazard quotient/hazard index" method of analysis. The hazard quotient/hazard index analysis provides an acceptable approach to determining air emission health risks. Acid gases include hydrogen chloride, sulfur dioxide, nitrogen oxides, hydrogen fluoride, and sulfuric acid mists. Certain meteorological conditions, including temperature inversions or fog, interact with acid gases to form acid mists and other agents injurious to human lung function. The acid gases/acid mists risk assessment indicates that the incineration facility increases the potential for hazardous health impacts on the local population.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Environmental Regulation enter a Final Order denying the application of Bio-Med Services, Inc., for a permit to construct a biohazardous waste incineration facility at the LaBelle Industrial Park, in LaBelle, Florida. DONE and RECOMMENDED this 31st day of March, 1992, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of March, 1992.

Florida Laws (9) 120.54120.57120.68403.021403.087403.702403.703403.704403.707
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer