CONSTRUCTION INDUSTRY LICENSING BOARD vs. ARWOOD HOLLINS, 89-001611 (1989)
Division of Administrative Hearings, Florida Number: 89-001611 Latest Update: Sep. 21, 1989

The Issue Whether Respondent is guilty of failing to discharge his supervisory duties as a qualifying agent, in violation of Section 489.11 and 489.105(4), Florida Statutes. Whether Respondent is guilty of making misleading, deceitful or untrue representations, in violation of Sections 489.129(1)(c) and 455.227(1)(a), Florida Statutes. Whether Respondent is guilty of gross negligence, incompetence, misconduct, fraud or deceit in the practice of contracting, in violation of Section 489.129(1)(m), Florida Statutes. Whether Respondent is guilty of exceeding the scope of his state registered mechanical contractor's license, in violation of Section 489.117(2), Florida Statutes.

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts were found: Respondent, Arwood Hollins, in 1986 held a mechanical contractor's license (RM0016479) with the State of Florida. Respondent owned a 50% interest in All Florida Air Conditioning, Refrigeration, Heating and Ventilation, Inc. (hereinafter referred to as "All Florida"), a Florida corporation. The Respondent has resided in Lake Jem, Lake County, Florida for approximately 15 years. The main offices of All Florida are located in Lake Jem, Lake County, Florida, with a branch office in Orlando, Orange County, Florida. In 1986 the Respondent was the sole qualifying agent for All Florida. Pursuant to the Respondent's mechanical contractor's license with the State of Florida, he is required to comply with all local license requirements. Respondent has never held nor applied for a license in Seminole County to practice mechanical contracting. The Respondent holds a certificate of competency in Lake and Orange Counties, and inactive certificates for Dade and Sumter Counties, but does not hold a certificate in Seminole County. In 1986 All Florida advertised in the Donnelly Directory for United Telephone (Exhibit 2) in the Central Florida area. Said ad depicts All Florida as being a repair specialist. Complainant, Janis Chamberlin, resides at 105 Rockingham Court, Longwood, Seminole County, Florida. All work performed by All Florida on the Complainant's air conditioning system was performed at the Rockingham Court address in Seminole County, Florida. Respondent testified that although he has lived in Central Florida for 15 years, he is unfamiliar with Seminole County and practices only in Lake and Orange Counties. Seminole County has enacted an ordinance (Number 83-15) which requires that before any person can be issued a license to practice mechanical contracting in Seminole County, they must meet certain requirements. Between January 28, 1986 and August 3, 1986, Robert Hollins, the son of Respondent and an employee of All Florida, traveled to the Complainant's house at 105 Rockingham Court, Longwood, Seminole County, Florida on at least six (6) occasions to perform inspections and/or repairs on the Complainant's air conditioning and heating equipment. Five (5) of the visits, between March 17, 1986 and August 3, 1986, involved problems with the cooling of the air conditioning system. Complainant, Janis Chamberlin, contacted All Florida after she found the company in a Yellow Page and in the Donnelly Directory phone book in late January, 1986 regarding problems with her heating system. Robert Hollins travel led to Mrs. Chamberlin's house at 105 Rockingham Court in Longwood, Seminole County, Florida and made repairs to a circuit breaker. Mrs. Chamberlin again contacted All Florida on or about March 17, 1986 due to a problem with her air conditioning unit. Mrs. Chamberlin spoke with Robert Hollins and gave him directions to her house. Mr. Hollins did not ask if she resided in Seminole County. Robert Hollins advised Mrs. Chamberlin that there was an extensive freon leak in her air conditioning unit and that her ECU unit on the air conditioner would need to be disconnected to insure that all the leaks would be stopped. Thereafter, Robert Hollins assured Mrs. Chamberlin that all of the leaks had been taken care of. She was charged $245.45 for the visit for labor and materials, which she paid. Approximately two months later, on or about May 19, 1986, Janis Chamberlin heard noises from the air conditioning unit. Robert Hollis was called and he traveled to Mrs. Chamberlin's house and charged her a total of $28.00 for the visit and the air conditioning unit stopped making noises. Approximately two months later, the same air conditioning unit was failing to cool properly and Mrs. Chamberlin again called All Florida. Robert Hollis traveled to the Chamberlin residence and advised that the condenser fan motor had quit working and needed to be replaced. Mrs. Chamberlin authorized the work and thereafter Robert Hollins assured her that he had replaced the condenser fan motor with a new one. Mrs. Chamberlin was charged a total of $248.50 for the new fan motor, other materials and labor. On August 3, 1986, Mrs. Chamberlin noticed a loud screeching noise coming from the air conditioning unit. She called Robert Hollins who arrived at Mrs. Chamberlin's house on the same day. He left the Chamberlin residence before telling Mrs. Chamberlin what was wrong with the unit. Mrs. Chamberlin noticed that the noise she had heard earlier had stopped temporarily. By approximately 9:00 p.m. on the same day, the noise returned and she noticed that there was a decrease in the cooling of the unit. By the following morning, the air conditioning unit was not working. Mrs. Janis Chamberlin contacted All Florida on August 4, 1989. Mrs. Chamberlin advised Robert Hollins that if he would not work on the unit that day, she would have to get someone else to do the job and to call her by 5:00 pm. that day to let her know. Robert Hollins did not call or come to her home by 5:00 p.m. Mrs. Chamberlin called Four Seasons Air Conditioning and Heating, Inc. to repair her air conditioning unit. William Pierce, an employee of Four Seasons Air Conditioning and Heating, Inc. in 1986, serviced the air conditioning unit at the Chamberlin residence on August 5, 1986. Mr. Pierce inspected the unit and found that the crank shaft was wrung off inside the compressor. There was a refrigerant leak and oil was visible all over the front of the condenser coil. Also, the fan motor was running backwards. Mr. Pierce's inspection of the condenser fan motor indicated rust around the shaft and fan hub. According to Mr. Pierce, if a fan motor is put on backwards, or rotates in the wrong direction, this would cause the head and back pressure to go up and could eventually internally overload the compressor. It did not do so in this instance, since the crankshaft was wrung off and the compressor froze up. Janis Chamberlin took pictures of the air conditioning unit (Composite Exhibit 10). These photographs were taken after William Pierce had pulled apart the air conditioning unit in preparation for installation of a new unit. The fan motor appears to show rust. The entire air conditioning unit in question was replaced by Four Seasons. Janis Chamberlin requested in writing that All Florida refund her the money paid to All Florida for repairs made to the air conditioning unit in the total amount of $516.95. The letter was dated August 12, 1986 and requested the refund by August 18, 1986. All Florida did not refund the monies. The Respondent never traveled to Mrs. Chamberlin's house to inspect the air conditioner in question or discuss with Mrs. Chamberlin the problems with the air conditioning unit. Robert H. Adams was accepted as an expert witness in the area of service of residential units in air conditioning and the responsibilities of a qualifying agent. Robert H. Adams is a certified residential contractor and he held a City of Jacksonville Master Heating and Air Conditioning license since approximately 1968. A qualifying agent is responsible for the conduct and supervision of the business, the supervision of it and the actions of its employees. The test for a freon leak in a residential unit is relatively simple. This includes looking for oil around any of the fittings, tubes and condensers. It normally takes only one service call to repair leaks. However, it is not unusual for a service technician to make more than one service call in order to locate all of the leaks. If a leak cannot be repaired, the serviceman should tell the client that it is not repairable. Unless a fan motor was exposed to chemicals or salt water, there would be no reason in a three week time span as to why it would rust. If an employee of a qualifying agent told a customer he was installing a new motor which turned out to be untrue, this would be the equivalent of deceit and fraud. Answering complaints from a customer is a distinct responsibility of a qualifying agent. If the fan motor installed in an air conditioning unit similar to the one installed at the Chamberlin residence has an improper rotation, this would affect the air conditioning unit. This would include causing an increase in pressures, inadequate cooling and could damage the compressor. During the period between March and July, 1986 and following three service calls, it is incompetence to fail to find freon and oil leaks. The Respondent received a minimum of three phone calls from his son, Robert Hollins, on July 15, 1986 concerning repairs needed to Mrs. Chamberlin's air conditioning unit. The Respondent spoke with his son, Robert Hollins, on May 19, 1986 concerning the service call at the Chamberlin residence. Robert Hollins in 1986 did not have a license to practice mechanical engineering in Seminole County, Florida and did not hold any license with the State of Florida other than a driver's license. In 1986, Robert Hollins resided in Leesburg, Florida, but was the sole employee at All Florida's branch office in Orlando, Florida. Although Robert Hollins would drive through Seminole County to and from work each day, he stated he was not familiar with Seminole County. Respondent testified that he had instructed his son to use a map in order to avoid performing any work in Seminole County, Florida. Robert Hollins did not examine a map to verify if the Chamberlin residence was in Seminole County, nor did he ask Mrs. Chamberlin which county she resided in. Every time Robert Hollins went to the Chamberlin residence for a service call, he checked in with the Respondent. On July 15, 1986, Hollins inspected the air conditioning unit at the Chamberlin residence and advised Mrs. Chamberlin she needed a new fan motor. Robert Hollins first obtains approval from Respondent before any purchase of equipment or machinery is made. On July 15, 1986, he obtained permission to purchase a new fan motor for the Chamberlin air conditioning unit. That same day Robert Hollins installed a new fan motor at the Chamberlin residence. The fan motor Hollis installed on July 15, 1986 had a 90 day warranty. All Florida warrants its work under the manufacturer's warranty. Subsequently, Chamberlin advised Hollins that the air conditioning unit was not working. He replied that if she had any problems with the unit he would rather not come out and work on it.

Recommendation Based upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: Respondent be found guilty of failure to discharge supervisory duties as a qualifying agent, violating Sections 489.119 and 489.105(4), Florida Statutes and that Respondent be reprimanded. Respondent be found not guilty of making misleading, deceitful, or untrue representations. Respondent be found guilty of incompetence, in violation of Section 489.129(1)(m), Florida Statutes, which caused monetary harm to the licensee's customer and that an administrative fine be imposed in the amount of $500. Respondent be found guilty of contracting in a county without a local license, in violation of Section 489.117, Florida Statutes, and that Respondent be reprimanded. DONE and RECOMMENDED this 21st day of September, 1989, at Tallahassee, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of September, 1989. APPENDIX TO RECOMMENDED ORDER, CASE NO. 89-1611 The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on findings of fact submitted by the Petitioner. The following Findings of Fact are Accepted: Paragraphs 1,2,3,4(in part) ,5,6,7,8,9,10,11,12,13,14,15(in part), 16,17, (in part),18,19,20,21,24,25,26,(in part),27,28,29,30(in part),31,32,33,34,35,36,37,38,39(in substance),40 The following Findings of Fact are Rejected: Paragraphs 22 and 23 - uncorroborated hearsay Pargraph 15(in part) - not relevant Paragraph 17(in part) - witness cannot give expert opinion testimony, since he was not qualified to testify as an expert COPIES FURNISHED: Fred Sealy Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Kenneth E. Easley General Counsel Department of Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 John E. Jordan, Esquire Wool folk, Estes and Keough, P.A. 131 Park Lake Street Post Office Drawer 3751 Orlando, Florida 32802 Richard A. Howard, Esquire Brownlee and Jacobs, P.A. Post Office Box 1448 Tavares, Florida 32778

Florida Laws (6) 120.57455.227489.105489.117489.119489.129
# 1
RICHARD R. MONGIOVE vs CONSTRUCTION INDUSTRY LICENSING BOARD, 94-001766 (1994)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Apr. 04, 1994 Number: 94-001766 Latest Update: Feb. 16, 1995

The Issue The issue is whether Respondent should deny Petitioner the right to take the state air conditioning contractor examination for lack of good moral character.

Findings Of Fact The National Assessment Institute ("NAI") provides examinations to the State Construction Industry Licensing Board, including the examination given for certification as a state air conditioning contractor. Petitioner has unsuccessfully taken the state air conditioning contractor examination approximately four times in the past. Petitioner has reviewed previous examinations and is familiar with procedures imposed pursuant to Section 455.229(2), Florida Statutes. No part of the examination may be copied, including any part of the questions or answers. Loose-leaf student manuals purchased from NAI may be taken into a review and retained by the student after the review is completed. Scratch paper provided by NAI officials during a review must be turned in at the conclusion of the review. On April 23, 1993, Petitioner reviewed a recent state air conditioning contractor examination. Petitioner reviewed the examination at a branch office of the NAI. Prior to April 23, 1993, Petitioner purchased a student manual. Petitioner placed one piece of carbon paper over one piece of blank paper and inserted the carbon set between two pages of the student manual. Petitioner taped closed the two pages of the student manual and tabbed the taped pages of the student manual ("altered pages"). Petitioner inserted three more carbon sets inside the student manual in identical fashion, producing a total of four altered pages. During the examination review on April 23, 1993, Petitioner placed a blank sheet of scratch paper on top of the first altered page of the student manual. Petitioner wrote the answers to the first part of the examination on the scratch paper. The answers were copied on the carbon set underneath the scratch paper. In a similar manner, Petitioner copied answers to each of the remaining three parts of the examination on the carbon sets inside each of the remaining altered pages in the student manual. Petitioner used a numeric code of "1-4" to represent answers "a-d" on each part of the examination. Petitioner used arithmetic symbols and other lines to disguise his effort by making it appear he was writing down mathematical formulas. However, the sequence of numbers "1-4" correspond to the correct answers "a-d" for each part of the examination reviewed. Petitioner copied 200 examination answers. During his testimony at the formal hearing, Petitioner explained: I did do something wrong. Transcript at 47. What I was trying to do was take down all the different letters. . . . I wanted to see if there was some kind of sequence where there were more A's, B's, more C's or more D's used. Transcript at 49. I was desperate. My whole life is air conditioning and refrigeration. * * * I've been trying to pass that test for at least the last two years, maybe more. . . . I believe it's been at least four times, maybe more. Transcript at 47. NAI representatives monitoring the examination review telephoned local police, and Petitioner was arrested pursuant to Section 455.2175, Florida Statutes. The materials used by Petitioner to copy examination answers were confiscated by police. Criminal charges were dismissed without conviction. Each examination question costs the state approximately $200. The 200 questions corresponding to the 200 answers copied by Petitioner will no longer be used by the state. Petitioner testified that he has dyslexia and attention deficit disorder. However, Petitioner has never requested additional time for an examination, never notified Respondent of Petitioner's disability, and never requested Respondent to provide special examination facilities or procedures.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a Final Order denying Petitioner's request to take the state air conditioning contractor examination for the reasons stated herein. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 26th day of October, 1994. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of October, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 94-1766 Petitioner's Proposed Findings of Fact Accepted in substance Rejected as conclusion of law 3.-8. Accepted in substance 9.-12. Rejected as irrelevant and immaterial 13. Accepted in substance 14.-15. Rejected as irrelevant and immaterial 16. Rejected as not supported by credible and persuasive evidence 17.-18. Rejected as irrelevant and immaterial Rejected as not supported by credible and persuasive evidence Rejected as irrelevant and immaterial and as recited testimony Rejected as not supported by credible and persuasive evidence Respondent's Proposed Findings of Fact 1.-8. Accepted in substance Rejected as irrelevant and immaterial Rejected as not supported by credible and persuasive evidence 11.-13. Accepted in substance COPIES FURNISHED: Richard Hickok Executive Director Construction Industry Licensing Board Department of Business and Professional Regulation 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Jack McRay Acting General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 James W. Kline, Esquire P.O. Drawer 30 180 South Knowles Avenue Winter Park, Florida 32790-0030 Clark R. Jennings, Esquire Assistant Attorney General Deptartment of Legal Affairs Administrative Law Section Suite PL-01, The Capitol Building Tallahassee, FL 32399-1050

Florida Laws (3) 120.57455.2175455.229
# 2
JOHN L. HORN vs. CONSTRUCTION INDUSTRY LICENSING BOARD, 80-002147 (1980)
Division of Administrative Hearings, Florida Number: 80-002147 Latest Update: Apr. 28, 1981

Findings Of Fact The Petitioner, John L. Horn, applied for and took the February 22, 1980, examination for a Class B air conditioning contractor's license, having been qualified, and meeting all preliminary requirements to sit for this examination. Mr. Horn answered Question 6 of the exam by selecting multiple choice Answer E. Question 6 of the February 22, 1981, examination was as follows: The contractor for the classroom and office building shown on Drawing AC-3 is required to accurately measure the air flow from each of the air handling units. Which of the following methods should be used? A magnehelic gauge with the high pressure port connected to the supply duct and the low pressure port connected to the return duct. An inclined draft gauge with a pitot tube traverse at several points in the supply duct to determine the mean velocity. An inclined draft gauge with a pitot tube traverse in the centerline of the supply duct to determine the actual velocity. A rotating vane anemometer located in the supply duct air stream. A velometer located at each sidewall outlet. All answers except Answer B were graded as incorrect, including the answer submitted by Mr. Horn. The February, 1980, Class B air conditioning contractor's examination was developed by American Community Testing Services, located in Jacksonville, pursuant to a contract with the Department of Professional Regulation. Question 6 was prepared by Mr. Larry Simmons for the testing service. This question seeks multiple Choice Answer B as the correct answer. Each examination question is written by an expert in the field, and is then checked by another expert for accuracy. The questions are then reviewed by a consultant to the testing service who is a professor of mechanical engineering. These internal review procedures are utilized to minimize the existence of errors. Prior to the time an examination question is used, it is subjected to Departmental review to assure that any grammatical errors are corrected. Subsequent to the examination, Question 6 and the various answers given by examinees were analyzed. Based upon testing criteria, Answers C and D in Question 6 were judged to possibly be correct, in addition to Answer B. Based on this same testing criteria, however, Answers A and E were not possibly correct. A discrimination index disclosed that Question 6 was a difficult question. Nevertheless, every examinee is qualified by experience to sit for the examination, which is designed for competition among peers. The post-examination review procedures used by the Department are for the purpose of assuring that there is not another correct answer. This review is performed by the writer of the question and an expert in the field being reviewed. The preferred method for measuring air flow is to use a pitot tube traverse, as suggested by Answer B. Other methods are available alternatives, but are not given as choices in the answers to Question 6. Answer A is incorrect because it measures static pressure and not air flow. Answer D is not correct because of the large hole that would have to be cut in the duct in order to insert the instrument, and after sealing the duct no reading could be taken. Answer E is also incorrect because it would allow air to flow into the room. Answer C could be correct in a small duct, but not in the duct shown on the drawing accompanying Question 6. The question seeks the best answer among the five choices; Answer B is the only acceptable choice and the correct answer. Twelve of the 14 persons who scored in the upper 27 percent on the examination answered Question 6 correctly, by choosing Answer B. Only 7 of the 19 persons who scored in the lower 27 percent on the examination answered this question correctly. This difference produced a discrimination index of .47 percent, which is within professional testing standards as an accurate measure of the validity of the question. This evidence was not controverted. Thus, based upon generally accepted testing criteria, the discrimination index shows Question 6 to be a valid question, and Answer B to be the correct answer. Mr. Horn's contentions are not supported by the weight of the evidence presented. The burden of proof is upon an applicant for a license to demonstrate that he meets all standards for eligibility. Mr. Horn did not present sufficient evidence to meet this burden of proof, and the Board established by substantial, competent evidence the validity of Question 6 and the correctness of Answer B.

Recommendation Based upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the application of John L. Horn for a license as a state certified Class B Air Conditioning Contractor be denied. THIS RECOMMENDED ORDER entered on this 15th day of April, 1981. WILLIAM B. THOMAS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of April, 1981. COPIES FURNISHED: John L. Horn 114 Willow Branch Avenue Jacksonville, Florida 32205 Charles F. Tunnicliff, Esquire Assistant General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Patricia R. Gleason, Esquire Assistant Attorney General The Capitol Tallahassee, Florida 32301

Florida Laws (3) 489.107489.111489.113
# 3
PINELLAS COUNTY CONSTRUCTION LICENSING BOARD vs PAUL W. BOURDON, 10-000096 (2010)
Division of Administrative Hearings, Florida Filed:St. Petersburg, Florida Jan. 11, 2010 Number: 10-000096 Latest Update: Jul. 23, 2010

The Issue The issue is whether Respondent violated Subsection 489.129(1)(q), Florida Statutes (2008),1 by allegedly failing to satisfy within a reasonable time the terms of a civil judgment relating to the practice of the licensee's profession.

Findings Of Fact Petitioner is the agency charged with regulating building contractors in Pinellas County, Florida. Respondent is a building contractor, pursuant to license number C-6811 (RB0042337).2 Respondent is the primary qualifying agent for Timberlore Construction, Inc. (Timberlore). The business address of Timberlore is 2142 B Palm Harbor Boulevard, Palm Harbor, Florida 34683. On February 14, 2002, Timberlore contracted with Cox Air Conditioning and Heating, Inc. (Cox), for the installation of an air-conditioning system at a construction site at 19636 Gulf Boulevard, Indian Shores, Florida 33785. A dispute arose between Timberlore, as the general contractor, and Cox, as the subcontractor. As a result of the dispute, Timberlore sued Cox for breach of contract and negligence and for attorney’s fees and costs. After a non-jury trial, the court entered two final judgments. The first final judgment, entered on December 4, 2008, was a determination of liability. The court found that Cox was not liable for the failure of the air-conditioning unit that Cox had installed. Rather, the court found that excessive humidity caused the failure of the air-conditioning unit and damage to the premises and that the condition was aggravated by Timberlore. The court found that Cox was the prevailing party entitled to attorney’s fees and costs from Timberlore. The second final judgment against Timberlore determined the amount of attorney’s fees and costs. The court ordered Timberlore to pay attorney’s fees of $80,775.00 and costs of $30,423.79 plus annual interest of eight percent. Timberlore repaired the damaged air-conditioning system at the construction site. There is no harm to the consumer. Respondent disputes whether attorney’s fees and costs awarded by a court in a dispute between a contractor and a subcontractor relate to the practice of the licensee's profession within the meaning of Subsection 489.129(1)(q). The only evidence relevant to this issue was the testimony of Petitioner's witness.3 The fact-finder finds the testimony of Petitioner's witness after cross-examination to be credible and persuasive and agrees that the judgment for attorney’s fees and costs, under the facts and circumstances in this case, relates to the practice of the licensee's profession. Respondent has failed to satisfy a civil judgment obtained against the business organization qualified by the licensee within a reasonable time in violation of Subsection 489.129(1)(q).

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Pinellas County Construction Licensing Board enter a final order finding Paul W. Bourdon guilty of violating Subsection 489.129(1)(q) and suspending Paul W. Bourdon's license until the judgment is satisfied. DONE AND ENTERED this 27th day of April, 2010, in Tallahassee, Leon County, Florida. S DANIEL MANRY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of April, 2010.

Florida Laws (3) 120.57489.117489.129
# 4
FLORIDA REAL ESTATE COMMISSION vs BARBARA OWEN MOONEY AND WILLIAM B. WILTSHIRE, JR., 90-003868 (1990)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jun. 25, 1990 Number: 90-003868 Latest Update: Mar. 05, 1992

The Issue The issue for determination in this proceeding is whether Respondent committed the acts alleged in the Administrative Complaint and, if so, what disciplinary action, if any, should be imposed.

Findings Of Fact Petitioner is the state licensing and regulatory agency charged with the responsibility and duty to prosecute administrative complaints pursuant to the laws of the State of Florida. Respondent is now and has been at all times material to this proceeding a licensed real estate salesman in the state, holding license number 0488568. The license was issued %Tequesta Properties, Inc., 169 Tequesta Drive, Tequesta, Florida 33458 ("Tequesta"). On June 29, 1989, Respondent negotiated a contract for the sale and purchase of a single family residence located at 65 Willow Road, Tequesta, Florida (the "contract"). The residence was listed for sale with Tequesta. The sellers were Frank and Hilda Sceusa, and the buyers were Dale and Cathy Favre. The buyers first saw the listed property at an open house. Respondent was present at the open house because the listing agent was busy with another transaction. The contract provided: Inspection, Repair And Maintenance: Seller warrants that as of 10 days prior to closing, the ceiling, roof . . . and exterior and interior walls do not have any VISIBLE EVIDENCE of leaks or water damage and that the septic tank, pool, all major appliances, heating, cooling, electrical, plumbing systems, and machinery, are in WORKING CONDITION. Buyer may, at Buyer's expense, have inspections made of those items by an appropriately Florida licensed person dealing in the construction, repair, or maintenance of those items and shall report in writing to Seller such items that do not meet the above standards as to defects together with the cost of repairing them prior to Buyer's occupancy or not less than 10 days prior to closing whichever occurs first. Unless Buyers report such defects within that time, Buyer shall be deemed to have waived Seller's responsibilities as to defects not reported. . . . Buyer shall be permitted access for inspection of property to determine compliance with this Standard. Respondent failed to give the buyers a reasonable opportunity to inspect the house or to have it inspected by a professional inspector. Buyers requested a pre-closing inspection approximately three or four times. Each time the buyers made their request through Respondent. The buyers asked Respondent to arrange for their access into the property for the purpose of conducting an inspection. Respondent ultimately accompanied the buyers through the premises the night before the closing. Respondent misrepresented the condition of plumbing in the house. During the walk-through the night before the closing, the buyers asked Respondent about a rag covering the goose neck under the kitchen sink. Respondent advised the buyers that the rag was left there after cleaning and that nothing was wrong with the plumbing. Respondent misrepresented the provisions of a warranty that was transferred to the buyers with the sale of the house. The house was sold to the buyers with a home owners warranty ("HOW") purchased by the listing broker. Respondent told the buyers they did not have to worry about the appliances in the house, including the air conditioning, because the entire property was covered by the warranty. Respondent specifically represented that the air conditioning system was in good working order. Respondent never read the HOW contract and did not explain to the buyers exclusions for preexisting conditions, prorations for other conditions, and the requirement that the buyers pay a $100 deductible for each covered defect. Respondent failed to familiarize himself with the house and failed to inquire of the sellers as to any problems that existed in the house. The kitchen sink backed up within a month after the date of closing because it was clogged with sand. The pipe was rusted completely through and there was a three inch gash in the pipe. The rag that had covered the pipe during the walk through concealed the defects in the pipe that otherwise would have been readily visible. The air conditioning system failed after closing. The repairs to the air conditioning system were not covered by the HOW contract. Representatives of HOW determined that the problems with the air conditioning system were preexisting and not covered under the terms of the contract. The air conditioning unit was replaced by the buyers who were reimbursed by the listing broker. The buyers experienced problems with a number of the components in the house. In addition to the previously mentioned air conditioning and plumbing problems, there were electrical problems and all of the appliances had to be replaced. Respondent misrepresented the amount of known repairs. The buyers knew prior to closing that the pool needed to be re-marcited. Respondent represented that the cost of such a repair would be approximately $1,000. The actual cost was approximately $3,000. Some of the problems experienced by the buyers were patent defects and some were latent defects. All of the problems, however, could have been discovered and corrected prior to closing if an inspection had been conducted by a Florida licensed person experienced in the construction, repair, and maintenance of such matters. Respondent failed to carry out his responsibilities as a real estate professional. It is customary practice in the community for the selling agent to arrange for pre-closing inspections done by professional licensed inspectors. The listing agent for the residence asked Respondent the day before the closing if Respondent had scheduled the pre-closing inspection. Respondent admitted that he had forgotten to schedule the inspection. When Respondent scheduled a walk through for the buyers the night before closing, there was insufficient time for the buyers to schedule an inspection by a professional inspector. The buyers relied upon the representations of Respondent with respect to the HOW contract and the condition of the house.

Recommendation Based upon the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED that Petitioner should enter a Final Order finding Respondent guilty of misrepresentation and culpable negligence in violation of Section 475.25(1)(b), Florida Statutes, suspending Respondent's license for 90 days, imposing an administrative fine of $600, and placing Respondent on probation for one year. The Final Order should further provide that during the period of probation Respondent should complete 60 hours of post-licensure education. DONE and ENTERED this 22nd day of January, 1992, in Tallahassee, Leon County, Florida. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of January 1992.

Florida Laws (2) 120.57475.25
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. HOYT PAGE, 83-000025 (1983)
Division of Administrative Hearings, Florida Number: 83-000025 Latest Update: Dec. 04, 1990

Findings Of Fact The following facts (a) through (r) are found based upon a stipulation by and between counsel for Petitioner and counsel for Respondent as to the truth of these facts: Respondent is a registered general con- tractor having been issued License No. RG0019039. Respondent's last known address is c/o Page Construction Company, 402 Davenport Drive, Valparaiso, Florida 32580. At all times material herein, Respondent was the qualifying agent for Page Con- struction Company. In August, 1980, Lillian Mark contacted the Respondent for advice as to how to get the central air conditioning system at her residence into operation. On August 15, 1980, Respondent inspected the old air conditioning unit and recommended that Lillian Mark have a new air conditioning system installed in the residence. On August 20, 1980, Respondent, who was doing business as Page Services, orally contracted to install a new Mammoth water- to-air heat pump at Lillian Mark's residence, located at 408 West Cedar Street, Niceville, Florida. Lillian Mark paid to Respondent a $1,600 down payment on the system, by check payable to Page Services. Respondent immediately started work on the installation and completed the work on August 23, 1980. On August 23, 1980, Lillian Mark gave Respondent a check in the amount of $435 payable to Page Services. A portion of the $435 was to pay for repairs to the duct system. The only license held by Respondent was a general contractor's license. At the time Respondent performed the work for Lillian, he was doing business as Page Services. The Mammoth heat pump installed by Respon- dent failed to heat the residence during cold weather. Further, the system required a large quantity of water to operate, which resulted in excessive water utility bills. Respondent agreed to remove the Mammoth water-to-air unit and replace it with a Ruud Air Conditioning System. However, the Respondent failed to install the new system properly, and water leaked from the unit causing property damage to Lillian Mark's residence. Further, the new Ruud unit failed to operate as installed. In May, 1980, Agnes Webb contacted Respon- dent for advice as to what work was required to make the air conditioning system in her residence operable. Respondent inspected the old air conditioning unit, and recommended that Agnes Webb have a new air conditioning system installed in the residence. On or about May 21, 1980, Respondent orally contracted with Agnes Webb to install a Ruud heat pump at her residence located at 1008 Bayshore Drive, Niceville, Florida. Respondent installed the unit and Agnes Webb paid Respondent $1,700 for the work. When Respondent performed the work for Agnes Webb, he had only his general contractor's license. Respondent has made full restitution to Lillian Mark for all costs incurred by her as a result of work performed by Mr. Page. Respondent has made full restitution to Agnes Webb for all costs incurred by her as a result of work performed by Mr. Page. Respondent failed to obtain a permit for the installation of the air conditioning system at the Mark residence. Respondent failed to obtain a permit for the installation of the air conditioning system at the Webb residence. Niceville City Ordinance 309 (1973) required that a permit be obtained for the installations at the Mark and Webb residences. The Respondent installed an air handler unit inside and the heat pump unit outside at the Mark residence. He hired another person to do the electrical work. Following the Mark installation, the air conditioning function worked fine but the unit would not heat. The unit used an excessive amount of water. Respondent, at Ms. Mark's request, replaced the heat pump unit with a totally electric Ruud unit. The second unit worked fine but leaked large amounts of water and soaked the carpet. The Respondent then paid two men to install a third unit in the Mark's home. The installation of the third unit required additional work because of the following problems: (1) the refrigeration lines were spliced and of two different sizes, (2) the electrical lines were spliced and had to be replaced, and (3) the control circuits had to be completely redone. The cost of these repairs was $349. The Respondent replaced the thermostat and entire air conditioning unit, and did some duct work at the Webb residence. The thermostat was not the proper type of thermostat for the unit installed and the outside duct work was not properly covered to protect it from weather. At the time of the Mark and Webb installations, the Niceville City Ordinance No. 304 (-1974) required registration of general contractors, electrical contractors, plumbing contractors, and mechanical contractors. The Respondent was not registered with the City of Niceville. In addition to his state general contractor's license, the Respondent holds an Okaloosa County occupational license as a general contractor and an occupational license with the City of Valparaiso, Florida, as an electrical contractor. At no time did Respondent qualify Page Services to engage in the business of contracting in the State of Florida. Respondent was the contractor who was responsible for the entire installation at the Mark and Webb residences. He was aware certain licenses and permits were required by the City of Niceville. There was no evidence that Respondent checked with any City of Niceville official to determine if a permit was required for installation of air conditioning systems. Respondent had performed work on other jobs for other contractors where permits had been obtained for this type work. The Respondent was also aware that if he put in a new air conditioning system, including duct work, he would need a permit. He also understood that if he ran a new circuit, he needed a permit. Respondent understood that the work performed for Agnes Webb and Lillian Mark was replacement of a system, not repair of a system. Respondent did not check with any official of the City of Niceville to determine if he needed a particular license to perform air conditioning work in the City of Niceville. He was not personally aware that such a license was required. Since the filing of this action, Respondent has registered to take the examination in Okaloosa County for a license to do air conditioning repair work.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Respondent be found guilty of those specific violations as set forth above and that he be required to pay an administrative fine of $500. It is further recommended that Respondent's license as a registered general contractor be suspended for a period of 6 months. DONE and ENTERED this 21st day of June, 1983, in Tallahassee, Florida. MARVIN E. CHAVIS, Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of June, 1983. COPIES FURNISHED: John O. Williams, Esquire 547 North Monroe Street Tallahassee, Florida 32031 Harold F. Peek, Jr., Esquire Post Office Box 147 Valparaiso, Florida 32580 Mr. Fred Roche Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. James Linnan Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202

Florida Laws (5) 489.105489.113489.117489.119489.129