Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
CONSTRUCTION INDUSTRY LICENSING BOARD vs. WALLACE W. STEWART, 83-001301 (1983)
Division of Administrative Hearings, Florida Number: 83-001301 Latest Update: Jun. 01, 1984

Findings Of Fact At all times pertinent to the issues herein discussed, Respondent Wallace W. Stewart was licensed as a registered air conditioning contractor by the Florida Construction Industry Licensing Board under License No. RA 0022169. Since at least October 1979, Respondent has been qualifying agent for the contracting firm "Stewart's Solar Energy, Inc.," with the Florida Construction Industry Licensing Board. In September 1979, Fred Johnson was acting as real estate agent for his son, Don F. Johnson of Ponte Vedra, Florida, a licensed general contractor who at the time had several residences for sale in the area. During that period, Mr. Fred Johnson engaged in a discussion with the Respondent concerning the possibility of installing a solar cooling, heating and hot water system in the house that Mr. Johnson proposed to have his son, Don, build for him in St. Johns County, Florida. Pursuant to these discussions, on September 10, 1979, Respondent prepared a proposal for Mr. and Mrs. Fred Johnson for the installation of a complete cooling and heating system and solar collectors for the purpose of domestic hot water in the said residence. Before this proposal was accepted, Mr. Fred Johnson's son, Don, discussed the terms of the proposal with the Respondent. Specifically discussed was that portion of the proposal wherein Respondent proposed to include the following: Necessary piping for circulating chilled and hot water system, perimeter heat, storage tanks for hot and cold water, necessary heat exchangers, refrigeration equipment, circulating pumps, duct system, thermostats, heat exchanger (fireplace), also piping and controls for the hot water heater. Before allowing his father to sign this proposal and accept it, Don Johnson asked Respondent exactly what he proposed to provide regarding the fireplace and was told that Mr. Stewart would provide a firebox interior, which consisted of a steel box shaped like a fireplace, to protect the heat exchanger that was to go with it. At that time, Mr. Stewart took Don Johnson into his workshop and showed him an outfit which he indicated would be similar to, if not identical to, that which he intended to install in the senior Johnson's home. It was understood that Respondent would supply the firebox and heat exchanger, but the builder was to do the masonry work and the chimney. Thereafter, based upon that understanding, Don Johnson recommended to his father that he accept the proposal, which was accomplished on or about the September 10, 1979, date; and both Fred Johnson and his wife, Christine, did so, agreeing to pay, for the complete system, the sum of $5,483 in accordance with a schedule set forth in the proposal sheet. Construction was begun and progressed to the time it was appropriate to install the firebox. At that point, Respondent told Don Johnson, the builder, he was unable to provide the firebox at that time. Since the state of construction was such that a delay in providing the firebox would hold up the continuance of construction, Respondent asked Don Johnson if he, Don, could provide the standard firebox into which Respondent would put his heat exchanger and thereafter give a credit against the purchase price. In response to this suggestion, Don Johnson told Respondent the cost would be between $400 and $500, to which sum Respondent agreed. As a result, Don Johnson put in the firebox that he procured, and Respondent thereafter put in the heat exchanger unit. Construction on the house continued until such time as, in April 1980, the house was considered sufficiently complete for Mr. and Mrs. Fred Johnson to move in. In the interim, however, in order to get the duct work done for the air conditioning and heating system he installed, Respondent, who was not licensed to perform heating and air conditioning installation in St. Johns County, Florida, arranged with Mr. Everett Masters, owner of Masters Heating and Air Service of St. Augustine, Florida, to do the duct work for the Johnson home. A building mechanical permit is not required to do duct work, and Mr. Masters did the duct work without a permit, even though he was not satisfied that the installation called for in the drawings was sufficient to accomplish the purpose of heating and cooling for a house that size. According to Mr. Masters, he did the work according to the specifications given to him, but protested to a representative of Mr. Stewart, Respondent, that the ducts were too small. In response, he was told to put the ducts in as called for in the specifications, which he did, but was never paid for the work he provided. St. Johns County Ordinance No. 76-20, an ordinance regulating contractors and the business of contracting within that county, at Section 4 thereof requires that air conditioning contractors be certified in order to conduct that business within the county. The contract involved here for the construction of Mr. Johnson's house would have required the contractor, Respondent, to have a local license to complete the air conditioning work. Respondent does not have a license in St. Johns County and never has had one. As a matter of fact, before the work was done, Mr. Don Germain, an assistant building official for St. Johns County, told Respondent in 4Z. Germain's office that he, Respondent, would need a county license at the time Respondent had come to the office prior to installing the air conditioning unit in the Johnson house. At this point, Mr. Germain discussed the project, including the rough drawing Respondent had with him, and advised Respondent at that time what permits and what licensing provisions must be fulfilled. At that time, solar heating and hot water systems did not require the license. However, the other work called for in this contract, such as the installation of the air conditioning system, would require a type of license which Respondent did not have. Germain and the Respondent had an extensive discussion on this. As it appeared to Mr. Germain, Respondent could not seem to understand why a license would be needed. A mechanical permit was issued on April 23, 1950, to Masters Heating and Air for a part of the system. A part did not include the entire installation permit. This permit applied for by Mr. Masters was acquired at the request of Don Johnson, the contractor, who pleaded with him to do so because, according to Mr. Johnson, the only way he could get final approval of the construction in order to get the elec- tricity turned on in the house was if this permit was applied for and issued. The permit in question was issued for something other than the duct work accomplished by Mr. Masters. Mr. Masters did not install the air conditioning equipment, only the ducting. The permit, if legitimate, would allow final approval of the installation of the entire air conditioning system. The information contained on the permit was provided to Mr. Masters by Respondent. According to Mr. Germain, Respondent never did get final approval of the building inspector on the total installation. The equipment was not initially accepted by the building department, since it was not a unitary unit-- in which all segments are designed to work together as a unit. However, even though the unit was rejected by the building authorities, they let the work continue based on a letter from the engineer who approved the purchase of the system, which indicated the engineer would be responsible for the working of the unit. In addition, the building officials allowed the work on Mr. Johnson's home to continue even after the discussions regarding the lack of a proper licensee because Respondent assured Mr. Germain of the building office that Mr. Masters, who was in fact a registered and licensed air conditioning contractor in St. Johns County, was going to do the work. Though the unit was basically installed in April 1980, it was not working property even up to July 3, 1980 It did not cool properly. At that point, Respondent contends he was still owed some money by Mr. Johnson. In November 1980, when it became obvious that the initially installed compressor was insufficient in size to cool a house the size of Mr. Johnson's, Respondent replaced the compressor, installing one a half ton larger than that initially installed. At that point, Don Johnson paid Respondent the sum of $800, which, according to Mr. Johnson, was the entire sum owed on the complete installation after deduction of the credit of $483 for the firebox which Mr. Johnson fabricated in lieu of that initially proposed by Respondent and which Respondent could not provide. After Respondent was paid the $800, he stopped responding to calls to service the cooling system and the heating system, even though neither worked properly at that time. Respondent admits that at some point in time he refused to continue servicing Mr. Johnson's unit and did not honor the warranty. He contends, however, that he stopped servicing because Mr. Johnson still owed him $453. The weight of the evidence indicates otherwise. Mr. Johnson ultimately hired another craftsman to repair his system, and the system was repaired without any further assistance by Respondent.

Recommendation That Respondent pay a fine of $1,000, and that Respondent's license be placed on probation for a period of two years.

Florida Laws (3) 455.227489.117489.129
# 1
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs MICHAEL J. MORROW, 02-000888PL (2002)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Mar. 01, 2002 Number: 02-000888PL Latest Update: Oct. 29, 2002

The Issue Whether Respondent, a certified air conditioning contractor, committed the offenses alleged in the Administrative Complaint and the penalties, if any, that should be imposed.

Findings Of Fact At all times material to this proceeding, Respondent has been a certified air conditioning contractor, having been issued license number 1133613 on December 27, 1985. Petitioner's licensure file reflects that Respondent's license is held as follows: "Michael J. Morrow d/b/a ATM A/C & Refrigeration, Inc." (ATM). Respondent has never applied for a certificate of authority for ATM pursuant to the provisions of Section 489.119, Florida Statutes. On December 12, 1998, Carmen Schneider contracted with Sun Coast to install an air conditioning and heating unit at her residence located in Miramar, Florida. At no time has Sun Coast been a licensed air conditioning contractor. Respondent had no agreement to do any work for Ms. Schneider, and he had no agreement to subcontract the work for Sun Coast. The City of Miramar issued permit 98121104 for the Schneider job. According to its computer records, Respondent, d/b/a ATM pulled the permit for the Schneider job. The greater weight of the credible evidence established that neither Respondent nor his corporation pulled the permit for the Schneider job1 as alleged in Count II of the Administrative Complaint. Petitioner failed to establish that Respondent enabled Sun Coast to engage in uncertified or unregistered contracting in violation of Section 489.129(1)(d), Florida Statutes, as alleged in Count III. Petitioner presented an affidavit establishing that its costs of investigation of Respondent (absent attorney time) totaled $705.03. That affidavit does not state the cost of investigation for each count. On February 2, 1998, Petitioner entered a Final Order in Case Number 98-12100 that disciplined Respondent's license because he assisted an unlicensed person or entity engage in the uncertified and unregistered practice of contracting and because he proceeded on a job without a permit.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioner enter a final order that adopts the Findings of Fact and Conclusions of Law contained in the Recommended Order. It is further recommended that for the violation found for Count I, Respondent be assessed an administrative fine in the amount of $500.00 and that his license be suspended until such times he pays the administrative fine and complies with the requirements of Section 489.119, Florida Statutes. It is further recommended that Counts II and III of the Administrative Complaint be dismissed. DONE AND ENTERED this 17th day of June, 2002, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of June, 2002.

Florida Laws (7) 120.569120.5717.001489.119489.1195489.129865.09
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE A. WALLACE, 85-000037 (1985)
Division of Administrative Hearings, Florida Number: 85-000037 Latest Update: Jul. 26, 1985

Findings Of Fact Respondent, George A. Wallace, was, at all times material hereto, licensed as a Class "A" air conditioning contractor by the State of Florida, having been issued license number CA CO13239. Respondent was, at all times material hereto, the qualifier for EMC Corp. On May 14, 1981, EMC Corp. entered into a written agreement with Sophie Griffin to replace the heating and air conditioning unit at Ms. Griffin's home in Fort Lauderdale, Florida. The unit was installed in May, 1981, and Ms. Griffin promptly paid the full contract price of $2,200.00. Section 301(a), South Florida Building Code, provides: It shall be unlawful . . . to install or alter any equipment for which provision is made or the installation of which is regulated by this Code without first having filed application and obtained a permit therefore from the Building Official. A permit shall be deemed issued when signed by the Building Official and impressed with the seal of the governmental agency issuing said permit. Section 301.1(1), South Florida Building Code, provides: Permits, to be issued by the Building Official, shall be required for the following operations: * * * The installation, alteration, or repair of any air conditioning or refrigeration apparatus. . . . The South Florida Building Code has been adopted by Broward County. EMC Corp. installed the new heating and air conditioning unit at Ms. Griffin's home without first having obtained a building permit from the City of Fort Lauderdale, Florida. On March 20, 1984, EMC Corp. obtained the required permit, and paid a penalty of $25.00 for having failed to secure the permit before undertaking the work. On March 26, 1984 an inspector with the City of Fort Lauderdale inspected the installation of the unit and found, contrary to the provisions of Sections 2306 and 4801.10, South Florida Building Code, that the unit had not been anchored. EMC Corp. promptly anchored the unit. Section 4505.1. South Florida Building Code, provides: PERMITS REQUIRED: It shall be unlawful to do or commence to do any electrical work on a new installation of permanent or temporary wiring, any electrical apparatus or equipment or make extensions and/or changes to existing wiring systems . . . without having first filed application and obtained an electrical permit therefore from the Electrical Inspector. APPLICATIONS: Applications for permit will be accepted from only qualified persons or firms. . . . Neither Respondent nor EMC Corp. was a qualified electrician, nor were they licensed by the state of Florida as electrical contractors. EMC, without an electrical permit, connected the wiring of the new unit with the existing electrical service. Respondent contends, and the City of Fort Lauderdale agrees, that it is an accepted practice for an air conditioning contractor to disconnect the leads from an existing air conditioning unit and reconnect them to the new unit, without the necessity of an electrical permit, if there is no difference between the units. In this case the evidence establishes that, although the replacement and existing units were 3-ton units, the amperage demands of the replacement unit were greater than the existing unit, and that the existing wiring was inadequate. However, no hazardous condition was created by EMC Corp. reconnecting the leads from the existing unit to the replacement unit. Apart from the foregoing discrepancies, EMC Corp.'s installation of Ms. Griffin's new unit met all standards established by the South Florida Building Code. Further, EMC Corp. has faithfully fulfilled all warranty and service work it contracted to perform.

Florida Laws (2) 489.113489.129
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DENVER SAMMONS, 86-003516 (1986)
Division of Administrative Hearings, Florida Number: 86-003516 Latest Update: Aug. 05, 1987

Findings Of Fact At all times pertinent to the issues herein, the Respondent, Denver Sammons, was licensed by the State of Florida as a registered air conditioning contractor, Class B, and Respondent qualified Denny's Air Conditioning Service under his license. At the January 8, 1985 meeting of the Broward County Central Examining Board of Mechanical Technicians, (Board), the Board heard a complaint by Port Distributors, a local air conditioning supplier, to the effect that Mr. Sammons had submitted two checks to that company in August, 1982, both of which were returned for insufficient funds and that neither had been redeemed. The Board decided to notify the Respondent of the complaint against him and give him an opportunity to respond at the next regularly scheduled meeting of the Board which was held on March 12,1985. At that Board meeting, at which Respondent was present, Mr. Julius M. Farinhouse, Jr., representative of Port Distributors, outlined its complaint against the Respondent detailing the circumstances surrounding the issuance of the bad checks and the need by the recipient to secure a judgment against the Respondent for the amount represented by the checks. There was evidence presented to the Board that these checks issued to Port Distributors were not the only checks written by Respondent that were not properly and promptly honored. Respondent testified before the Board regarding the circumstances surrounding the issuance of the checks and contested the seriousness of the offense alleging that when notified of the bad checks, he had reimbursed Port Distributors for the majority of the sum covered by the two dishonored checks, but this repayment was applied toward current accounts rather than in satisfaction of the bad checks, contra to the intention of the Respondent. Having considered both the testimony presented by the complainants and the Respondent, the Board, that same date, March 12, 1985, nevertheless entered a Final Order finding that the passing of bad checks to Port Distributors by the Respondent constituted an act involving dishonesty, fraud, deceit, or lack of integrity in the operation of Respondent's contracting business; that he failed to make any effort to pay the outstanding bill owed to Port Distributors; and that this misconduct constituted a failure to comply with the standards of Section 9-7, Broward County Code. As a result, the Board ordered the Respondent's Broward County Certificate of Competency revoked that date. The Order of the Board made provision for Respondent to apply for reinstatement of his Certificate of Competency but no such application has ever been made. For several years prior to the issuing of the Certificate of Competency by Broward County, Respondent had, under the old procedure, held a Certificate of Competency issued by the City of Hollywood, Florida and had, each year, renewed that Certificate upon the payment of a $30.00 fee. The Certificate issued by the city was renewed effective January 1, 1985 and reflected on its face, that it was good until December 31, 1985. However, when the Broward County Board of Mechanical Technicians began to issue its county-wide Certificate of Competency, all prior city-issued certificates were declared to be null and void. As a result, though Respondent continued to hold his Hollywood certificate, it was ineffective and he should not have been allowed to renew it by the city, since he was, at that time, covered by a county Certificate of Competency. By action of the Board on March 12, 1985, Respondent's Board (County- wide) Certificate of Competency, which was the only valid certificate he held at the time, was revoked. Because of this revocation, Respondent was, thereafter, allowed to work as a journeyman for another Master Technician but could not contract in his own name or for his own business nor could he pull building permits from any county or city building office. Notwithstanding this, on or about August 12, 1985, Respondent entered into a contract acting as Denny's Air Conditioning, with Isabel Parra. This contract was to remove her old heating and cooling system in her residence at 2207 North 46th Avenue in Hollywood and to install a new unit to consist of a three ton gas furnace with air conditioning coil and condenser. Pursuant to the contract, Respondent did, in fact, remove the old unit and install a new one. However, he did not pull a building permit with the county or city building office and on August 26, 1985, officials of the City of Hollywood issued a Notice of Violation to Mrs. Parra reflecting that Denny's Air Conditioning installed a central air conditioning unit without permit and without possessing a valid contractor's license. Mrs. Parra further contended that when she turned on the unit, the noise it made was extremely loud and not to her satisfaction. Evidence introduced by both Petitioner and Respondent, however, indicates that the Respondent installed the new unit exactly as the old unit had been installed. Mrs. Parra testified that she had not heard the old unit in its heating mode and therefore had no idea whether it made as much noise as the new unit did. In any event, she withheld some of the funds that were due Respondent until such time as he agreed to have someone come out and correct the problem. It has been several months since the parties agreed to this and Respondent still has not corrected the problem. He contends that the contractor with whom he arranged to correct Ms. Parra's problem has been unable to get with her since she works during the days and is home only in the evenings. In any event, though not charged as a violation, it would appear that Respondent has failed to follow through on his work and on his commitment to complete an acceptable installation for Mrs. Parra. Petitioner also alleges that on or about June 25, 1985, the Broward County Consumer Protection Board issued a cease and desist order to Respondent for representing that he was qualified to perform contracting work in Broward County without possessing local competency. No evidence was introduced, however, to satisfy or establish this allegation. Because of the dispute between Mrs. Parra and the Respondent, and her dissatisfaction with the quality of his installation, she filed a complaint with the Board and on December 10, 1985, the Board again met and heard her testimony and that of Mr. Sammons. As a result, on December 20, 1985, the Board found that Respondent's contract with Mrs. Parra was based on a representation to her that he was a contractor when in fact the prior action of the Board had denied him this status. The Board further found that he failed to pull a permit for the installation of the unit in Ms. Parra's home and thereafter failed to comply with the warranty given to her under the contract executed by him on August 12, 1985, nor did he provide her with the rebate promised. Based on these Findings of Fact, the Board concluded that the Respondent willfully, deliberately, or negligently disregarded or violated the provisions of the South Florida Building Code; that he contracted to act as a qualifying agent for his business when he was not certified to do so; that he contracted and did work which was not within the description of the class (journeyman) for which he had been certified by the Board; and that he abandoned without legal excuse a construction project in which he was engaged and under contract to complete. As a result, the Board ordered that his journeyman's Certificate of Competency be revoked effective that day. Once the journeyman's certificate was taken away, Respondent was not authorized to act as an air conditioning installer or contractor under any circumstances. Notwithstanding this, on February 20, 1986, Respondent again, acting as Denny's Air Conditioning, entered into a contract with Dr. Eisenstein to install a new two-ton split system in the doctor's home in Hollywood for a total price of $2,530.00. Since Dr. Eisenstein had previously dealt with Respondent on several occasions and found him to be reliable, the doctor responded to Respondent's request for an advance by giving him a $2,000.00 deposit. The contract was not actually finalized until late in March, 1986 and work was to begin in early April. However, on April 1, 1986, Respondent called Dr. Eisenstein and advised him that his truck, in which was stored the equipment for installation into the doctor's home and the money bag which contained the balance of the doctor's downpayment had been illegally repossessed by Respondent's bank the night before. As a result, Mr. Sammons indicated he would not be able to begin the project but assured the doctor that someone else would do so starting at the end of the week. In fact, no work was ever started by the Respondent or anyone else on his behalf. After several days, when Dr. Eisenstein attempted to call Respondent, he found that Respondent's phone had been disconnected and when on April 5, 1986, the date promised by Respondent, no one came to begin work on the project, the doctor began undertook an investigation which led to the ultimate contact of the doctor by the Respondent. To reach Respondent, Dr. Eisenstein had checked with Respondent's business landlord and when Respondent finally called the doctor back, he was irate that the doctor had done so. During that conversation Dr. Eisenstein advised Respondent that he should either repay the money advanced or do the work. In fact, neither was done. During the month of April, 1986, Dr. Eisenstein sent Respondent two letters by certified mail requesting that he either refund the advance payment or do the work promised under the contract. One letter was returned undelivered. The other was apparently delivered. When neither letter resulted in any satisfaction, the doctor, in early June, 1986, sent a letter of complaint to DPR outlining the situation. Respondent tells an incredible tale regarding the facts and circumstances which led up to the dispute with Dr. Eisenstein. Admitting that he was somewhat in debt to his bank, he claims that certain payments that he made to the bank with part of the money advanced by the doctor was used improperly by the bank and applied toward other obligations rather than the debt on his truck. He claims the repossession of the truck was illegal and improper because, by the payment mentioned above, if properly applied, the truck would have been paid off. This story is almost a duplicate of that regarding the excuse for the bad checks to Port Distributors. Respondent further contends that that bank thereafter engaged in a conspiracy against him to bring about his financial ruin; that the bank hired several individuals to assault him and his wife outside their church; that he has received several threats of bodily harm from the bank; and that all of this has resulted in his filing suit against the bank in local court. This story was told by the Respondent under oath. However, Respondent failed to provide any names or documentation to support this with the exception of the name of the bank allegedly involved. When asked where copies of the documentation were that would support his allegations, he responded with, "Oh, they're at home in a file." In short, it would appear that Respondent's story is a gossamer of fantasy which, while possibly believed at this point by Respondent, has very little basis in fact. Respondent also contends, for example, that Dr. Eisenstein requested that he not pull a permit for the work to be done at his house because he did not want city officials for one reason or another to know that the work was being done. This information was not brought out through Dr. Eisenstein, but rather through the testimony of the Respondent. None of these stories were backed up by any document or supporting evidence. Consequently, it is found that while Respondent may well believe what he is saying, his are in fact, incredible. Respondent was disciplined on two separate occasions by the Broward County Central Examining Board of Mechanical Technicians and Respondent has not shown that these actions were procedurally violative of due process. Consequently, they are found to have occurred and to be valid. Respondent was not permitted to attack the circumstances leading up to the action by the board and the Hearing Officer declined to relitigate the factual propriety of the Board's two actions. Once having lost his Master Technician's license, Respondent was no longer authorized to pull building permits in Broward County and notwithstanding that, nonetheless did commence work for Mrs. Parra on a job which, under the ordinances of the county, required a permit be pulled. He also failed to live up to the terms of a warranty inherent in his contract with her. The evidence also established that subsequent to the withdrawal of his Journeyman's certificate, he nonetheless entered into a contract for the installation of a system in Dr. Eisenstein's house and accepted a substantial advance payment which he neither returned nor earned when he failed to begin any work on the project. In the opinion of the Petitioner's expert, Respondent's conduct in this instance was totally unprofessional and unethical. In fact, as a professional, if the circumstances occurred as alleged by Respondent, he should have made immediate arrangements to in some way make restitution of the funds to his client or have the work done by someone else. The evidence here shows that Respondent made no effort to make some accommodation to the client. He entered no promissory note (Respondent claims that as a gentleman, he has no need of notes as his word is sufficient); he made no attempt to let the client know what had happened; and in short, it appears that Respondent was out to make a quick buck (the expert's phrase) without attempting to in any way satisfy his client.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the Respondent's license as a registered air conditioning contractor be revoked. RECOMMENDED this 5th day of August, 1987, at Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of August, 1987. COPIES FURNISHED: G. Vincent Soto, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Mr. Denver Sammons Post Office Box 7437 4614 Madison Street Hollywood, Florida 33021 Mr. Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Van B. Poole, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Joseph A. Sole, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (3) 120.57489.117489.129
# 5
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, DIVISION OF HOTELS AND RESTAURANTS vs PINEY WOODS LODGE, 03-004051 (2003)
Division of Administrative Hearings, Florida Filed:Lake City, Florida Nov. 03, 2003 Number: 03-004051 Latest Update: Mar. 25, 2005

The Issue The issue in this proceeding is whether Respondent's motel license should be disciplined.

Findings Of Fact Respondent holds a motel license, number 2200031. The motel is located at 4140 West Highway 90, Lake City, Florida. On June 9, 2003, and on June 16, 2003, a division inspector inspected the Respondent's motel premises and specifically inspected room 207. The inspector noted five alleged deficiencies on June 9, 2003. On June 16, 2003, the inspector noted that three of the five alleged deficiencies remained uncorrected, while two of the alleged deficiencies were corrected during the June 16, 2003, re-inspection. The three uncorrected alleged deficiencies consisted of exposed insulation around the air conditioning unit in room 207, food buildup present in the microwave in room 207, and heavy lint buildup present in the lint filter of the motel's commercial clothes dryer. The two alleged deficiencies corrected during the re-inspection were the use of an electrical extension cord and an unsecured electrical outlet cover. Room number 207 was available for rent and was rented to the public by the Respondent on May 31, 2003, and again on June 19, 2003. During the interim time and at the time of these inspections, the room was not rented because it was undergoing repairs. During this time, the room was being used primarily as a handyman workroom for ongoing repairs. Part of the repairs being done to room 207 was to replace the permanent air conditioning unit in that room. Because the air conditioning unit did not work, Respondent had temporarily installed a window air conditioning unit. The window air conditioning unit did not fit the window it was in, therefore, Respondent had placed insulation around the unit. The insulation was exposed. The insulation was not a furnishing supplied with the room but was a temporary part of the building’s window/wall system intended as a prelude to replacing the air conditioning unit. Since the insulation was not a furnishing, its exposure did not violate Rule 61C-3.001(5) that addresses the cleanliness of room furnishings such as drapes. An extension cord was being used to power the window air conditioning unit in room 207. Even though Respondent unhooked the extension cord during the re-inspection, the use of the extension cord to power the air conditioning unit was a fire hazard and violates Chapter 509. Additionally, one of the electrical outlet cover plates was attached, but was loose. However, it did function as a barrier. There was no evidence regarding the space requirements for an electrical outlet or how the outlet cover impacts that space other than as a barrier. The evidence did not show that a loose outlet cover violates NFPA 70,110.32 that deals with the space requirements around electrical equipment. Finally, the microwave in room 207 had old food buildup on its walls. The microwave is a furnishing and is required to be kept clean. Such food buildup does not meet the cleanliness requirements of Rule 61C-3.001(5). Outside of room 207, the inspector personally observed the lint buildup in the dryer. Petitioner does require that the dryer’s lint trap be cleaned once a day. However, either the trap had not been cleaned or the dryer had received heavier use on the days of the inspection. The lint is a flammable material and the dryer trap must be kept free of such flammables. The accumulation of the lint was a fire hazard and is a violation of Rule 61C-1.004(7).

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is, RECOMMENDED: That the Department enter a final order finding Respondent guilty for violating Chapter 509, Florida Statutes, and imposing an administrative fine in the amount of $1,500.00. DONE AND ENTERED this 31st day of March, 2004, in Tallahassee, Leon County, Florida. S DIANE CLEAVINGER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 31st day of March, 2004. COPIES FURNISHED: Charles F. Tunnicliff, Esquire Department of Business and Professional Regulation 1940 North Monroe Street, Suite 60 Tallahassee, Florida 32399-2202 Kana Baleswaran, pro se Piney Woods Lodge 4140 West Highway 90 Lake City, Florida 32055 Geoff Luebkemann, Director Division of Hotels and Restaurants Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 Nancy Campiglia, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202

Florida Laws (2) 120.57509.261
# 6
FLORIDA REAL ESTATE COMMISSION vs BARBARA OWEN MOONEY AND WILLIAM B. WILTSHIRE, JR., 90-003868 (1990)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jun. 25, 1990 Number: 90-003868 Latest Update: Mar. 05, 1992

The Issue The issue for determination in this proceeding is whether Respondent committed the acts alleged in the Administrative Complaint and, if so, what disciplinary action, if any, should be imposed.

Findings Of Fact Petitioner is the state licensing and regulatory agency charged with the responsibility and duty to prosecute administrative complaints pursuant to the laws of the State of Florida. Respondent is now and has been at all times material to this proceeding a licensed real estate salesman in the state, holding license number 0488568. The license was issued %Tequesta Properties, Inc., 169 Tequesta Drive, Tequesta, Florida 33458 ("Tequesta"). On June 29, 1989, Respondent negotiated a contract for the sale and purchase of a single family residence located at 65 Willow Road, Tequesta, Florida (the "contract"). The residence was listed for sale with Tequesta. The sellers were Frank and Hilda Sceusa, and the buyers were Dale and Cathy Favre. The buyers first saw the listed property at an open house. Respondent was present at the open house because the listing agent was busy with another transaction. The contract provided: Inspection, Repair And Maintenance: Seller warrants that as of 10 days prior to closing, the ceiling, roof . . . and exterior and interior walls do not have any VISIBLE EVIDENCE of leaks or water damage and that the septic tank, pool, all major appliances, heating, cooling, electrical, plumbing systems, and machinery, are in WORKING CONDITION. Buyer may, at Buyer's expense, have inspections made of those items by an appropriately Florida licensed person dealing in the construction, repair, or maintenance of those items and shall report in writing to Seller such items that do not meet the above standards as to defects together with the cost of repairing them prior to Buyer's occupancy or not less than 10 days prior to closing whichever occurs first. Unless Buyers report such defects within that time, Buyer shall be deemed to have waived Seller's responsibilities as to defects not reported. . . . Buyer shall be permitted access for inspection of property to determine compliance with this Standard. Respondent failed to give the buyers a reasonable opportunity to inspect the house or to have it inspected by a professional inspector. Buyers requested a pre-closing inspection approximately three or four times. Each time the buyers made their request through Respondent. The buyers asked Respondent to arrange for their access into the property for the purpose of conducting an inspection. Respondent ultimately accompanied the buyers through the premises the night before the closing. Respondent misrepresented the condition of plumbing in the house. During the walk-through the night before the closing, the buyers asked Respondent about a rag covering the goose neck under the kitchen sink. Respondent advised the buyers that the rag was left there after cleaning and that nothing was wrong with the plumbing. Respondent misrepresented the provisions of a warranty that was transferred to the buyers with the sale of the house. The house was sold to the buyers with a home owners warranty ("HOW") purchased by the listing broker. Respondent told the buyers they did not have to worry about the appliances in the house, including the air conditioning, because the entire property was covered by the warranty. Respondent specifically represented that the air conditioning system was in good working order. Respondent never read the HOW contract and did not explain to the buyers exclusions for preexisting conditions, prorations for other conditions, and the requirement that the buyers pay a $100 deductible for each covered defect. Respondent failed to familiarize himself with the house and failed to inquire of the sellers as to any problems that existed in the house. The kitchen sink backed up within a month after the date of closing because it was clogged with sand. The pipe was rusted completely through and there was a three inch gash in the pipe. The rag that had covered the pipe during the walk through concealed the defects in the pipe that otherwise would have been readily visible. The air conditioning system failed after closing. The repairs to the air conditioning system were not covered by the HOW contract. Representatives of HOW determined that the problems with the air conditioning system were preexisting and not covered under the terms of the contract. The air conditioning unit was replaced by the buyers who were reimbursed by the listing broker. The buyers experienced problems with a number of the components in the house. In addition to the previously mentioned air conditioning and plumbing problems, there were electrical problems and all of the appliances had to be replaced. Respondent misrepresented the amount of known repairs. The buyers knew prior to closing that the pool needed to be re-marcited. Respondent represented that the cost of such a repair would be approximately $1,000. The actual cost was approximately $3,000. Some of the problems experienced by the buyers were patent defects and some were latent defects. All of the problems, however, could have been discovered and corrected prior to closing if an inspection had been conducted by a Florida licensed person experienced in the construction, repair, and maintenance of such matters. Respondent failed to carry out his responsibilities as a real estate professional. It is customary practice in the community for the selling agent to arrange for pre-closing inspections done by professional licensed inspectors. The listing agent for the residence asked Respondent the day before the closing if Respondent had scheduled the pre-closing inspection. Respondent admitted that he had forgotten to schedule the inspection. When Respondent scheduled a walk through for the buyers the night before closing, there was insufficient time for the buyers to schedule an inspection by a professional inspector. The buyers relied upon the representations of Respondent with respect to the HOW contract and the condition of the house.

Recommendation Based upon the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED that Petitioner should enter a Final Order finding Respondent guilty of misrepresentation and culpable negligence in violation of Section 475.25(1)(b), Florida Statutes, suspending Respondent's license for 90 days, imposing an administrative fine of $600, and placing Respondent on probation for one year. The Final Order should further provide that during the period of probation Respondent should complete 60 hours of post-licensure education. DONE and ENTERED this 22nd day of January, 1992, in Tallahassee, Leon County, Florida. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of January 1992.

Florida Laws (2) 120.57475.25
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. CHARLIE S. HIERS, 82-003329 (1982)
Division of Administrative Hearings, Florida Number: 82-003329 Latest Update: Jun. 07, 1983

Findings Of Fact Respondent Charlie S. Hiers is registered as a Class B air conditioning contractor and qualifier for Hiers Air Conditioning and Refrigeration, Orlando, Florida. As of July 1, 1979, his license became delinquent. (Petitioner's Exhibit 1) In December, 1981, Myrtle D. Harris, who resided at 7505 Ranchero Street, Orlando, engaged the services of Respondent to repair the air conditioning unit at her home. He had performed satisfactory air conditioning work for her on two prior occasions in 1979 and 1980. She had originally contacted him through an ad in the telephone directory under the name "Temp Control Service." On each occasion she had given him a check payable to Temp Control Services which was later endorsed in that name by Respondent. (Testimony of Harris, Petitioner's Exhibits 2-3) Respondent advised Mrs. Harris on December 2, 1981, that the compressor of her air conditioning unit needed to be replaced with a new compressor. She thereupon gave him a check in the amount of $546.00 and he provided her with a bill marked paid in that amount. Her chock, dated December 2, 1981, was made payable to Charlie Hiers, and his bill of the same date merely had his handwritten name at the top. Mrs. Harris later added the words "Temp Control" in the payee portion of the check after it had been endorsed by Respondent and returned after payment. (Testimony of Harris, Petitioner's Exhibits 4-5) Respondent proceeded to remove the old compressor and later came by Mrs. Harris' house and told her that he had had to order a replacement part. However, he never came back to her home or performed the work for which he had been paid. Mrs. Harris attempted to reach Respondent by leaving her telephone number at his answering service but received no reply. Later, sometime in January, Respondent telephoned her and stated that he had the compressor on his truck and would install it on a specified date. However, he never fulfilled his promise. Mrs. Harris attempted to reach him on subsequent occasions by telephone, but was unable to contact him. On February 1, 1982, Mrs. Harris had her nephew write a letter to Respondent requesting that he either perform the work or return the payment of $546.00. Several months later, after not having heard from the Respondent, Mrs. Harris purchased a new air-conditioner. Respondent has taken no action to perform his agreement or to return the amount which he was paid. (Testimony of Harris)

Florida Laws (4) 489.115489.119489.127489.129
# 9
ELECTRICAL CONTRACTORS LICENSING BOARD vs. ARNOLD A. DIXON, 86-004752 (1986)
Division of Administrative Hearings, Florida Number: 86-004752 Latest Update: Apr. 08, 1987

The Issue The issues are (1) whether engaging in air conditioning contracting regulated by the Florida Electrical Contractors Licensing Board pursuant to Section 489.500 et seq. Part II, Florida Statutes, constitutes exceeding the scope of one's license as an electrical contractor, (2) whether performing air conditioning contracting in the name of "Dixon's Heating and Air Conditioning" constitutes operating in a name other than the name his electrical contracting license is issued in, contrary to Subsection 489.533(1)(l), and (3) whether Respondent willfully violated the building codes by venting the heater improperly, failing to get a permit and get work inspected.

Findings Of Fact Notice of hearing was given to Respondent at Route 2, Box 595, Yulee, Florida 32097. Arnold Dixon is and has been at all times material to this case a registered electrical contractor, license number ER0004417. (Pet. Ex. 1 & 2) He has maintained his address of record as Route 2, Box 595, Yulee, Florida 32097. (T-Pg. 6) He has held such license since 1976. (Pet. Ex. 1 & 2) Arnold Dixon does not hold a license, a state registration or certification to engage in contracting as a heating or air conditioning contractor. (Pet. Ex. 4 & 6) Arnold Dixon does hold a Nassau County Occupational License as an electrical contractor and as a heating and air conditioning contractor. No check of local records was conducted to see if he had a local license as an air conditioning contractor. (T-Pg. 22) On or about June 1985, the Respondent's company, Dixon's Heating and Air Conditioning, contracted to install an air conditioning and heating unit at the home of John Williams for a contract price of $1985. (Pet. Ex. 5 and T-Pgs. 10 & 11) The work on this contract was done by David Everett, who negotiated the contract. The Respondent's company, Dixon's Heating and Air Conditioning, did not obtain a permit to perform the work at the Williams' residence. Inspections on the Williams' job were not called for by Dixon's Heating and Air Conditioning. Permits and inspections were required by the applicable building code. (T-Pgs. 25 & 26) Entering into a contract to perform air conditioning and heating work and performing such work is air conditioning contracting, which is regulated under Part I, Chapter 489, Florida Statutes. After installation by Dixon's Hearing and Air Conditioning, the Williams' heating system generated carbon monoxide when operating because there was insufficient fresh air being provided to the unit. Because the air intake was in a closet which restricted the air supply to the hot air handling system, the air handling unit sucked fumes from the exhaust side of the unit back through the unit's combustion chamber and circulated it through the house. The longer the unit ran, the more debris was trapped in the louvered door of the closet and the more combustion gases were pulled through the combustion chamber and distributed through the house by the air handling unit. (T-Pg. 34) According to the manufacturer's representative, the hot air return is required to be ducted into the unit. In this case, the return air was pulled from inside a closet which had louvered doors. No duct was used and this installation was not in accordance with the manufacturer's instructions. Although the unit as installed was unsafe and had the potential to kill, no evidence was received that failure to install the unit in accordance with the manufacturer's instructions was a violation of local building code. (T-Pgs. 34- 38) Dixon's Heating and Air Conditioning did not hold itself out to be and was not engaged in electrical contracting in fulfilling the Williams' contract. Dixon's Heating and Air Conditioning did hold itself out to be an air conditioning contractor and the work performed in fulfilling the Williams' contract was air conditioning contracting.

Florida Laws (4) 120.57489.117489.513489.533
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer