Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: The Tamaron wastewater treatment facility (facility), located at 3800 Gatewood Drive, Sarasota, Florida, serves the Tamaron residential subdivision which was originally developed by U. S. Homes Corporation in 1976. The subdivision presently consists of 499 homes and was completely built out in the mid-1980's. The facility was originally owned and operated by U. S. Homes Corporation. Tamaron Utilities, a nonprofit entity comprised of the 499 homeowners, acquired the facility in November, 1987. At that time, the facility's existing operating permit was transferred to Tamaron Utilities. The facility is overseen by an elected board of volunteer homeowners. The Department is the agency of the State of Florida that is authorized to regulate domestic wastewater treatment and disposal facilities and permit their construction and operation. It is the successor agency to the Department of Environmental Regulation. By letter dated November 10, 1987, the Department notified Tamaron of the requirements of Chapter 87-303, Laws of Florida (Grizzle-Figg Amendment), which amended Section 403.086, Florida Statutes, and of the Department's intention to modify Tamaron's operating permit to incorporate a schedule of compliance with Section 403.086, Florida Statutes, as amended by Chapter 87-303, Laws of Florida. On August 23, 1988, an operating permit (D058-141783), which contained secondary water treatment requirements, was issued to the facility. Specific condition 7 of the permit required that the facility be in compliance with the Grizzle-Figg Amendment by October, 1990, or eliminate discharge to surface waters. On September 5, 1990, Tamaron filed an application with the Department to renew its domestic waste water treatment and disposal systems operation permit. Tamaron did not consider its facility as discharging waste into one of the specifically named water bodies set forth in the Grizzle-Figg Amendment or to "water tributary thereto" and thereby required to meet the advanced waste treatment criteria set forth in the Grizzle-Figg Amendment. However, in an abundance of caution, Tamaron proceeded to bring its facility into compliance with the advanced waste treatment criteria as set forth in the Grizzle-Figg Amendment. After numerous requests for additional information and several meetings between Tamaron and the Department, the Department issued its Notice of Permit Denial on April 9, 1991, asserting that Tamaron had not provided: (a) reasonable assurance that the requirements of Section 403.086(1)(c), Florida Statutes, mandating advanced waste treatment (AWT) before discharge to certain designated surface waters, would be met and; (b) reasonable assurance that the discharge to those certain designated surface waters would result in minimal negative impact as required by Section 403.086(5)(a), Florida Statutes. The facility continues to operate under its secondary treatment permit No. DO58-141783. The facility consists of a wastewater treatment plant designed for secondary treatment, with tertiary filtration. The design capacity of the facility is 155,000 gallons per day (0.155MGD) with actual flows of slightly over 100,000 gallons per day (0.100MGD+). Three percolation ponds surround the facility comprising the primary effluent disposal method for the facility. The Tamaron subdivision has a series of excavated surface water bodies (stormwater lakes), hydraulically connected, which eventually discharge at the northeast corner of the subdivision into Phillippi Creek. The direct path of surface water flow is from the subdivision's stormwater lakes to Phillippi Creek. These stormwater lakes are in multiple ownership. Under Department policy, stormwater systems permitted by the Department, its predecessor DER, or a water management district solely as stormwater treatment facilities under Chapter 17-25, Florida Administrative Code, are not considered "waters of the State". However, stormwater systems built prior to Chapter 17-25, Florida Administrative Code, permitting requirements, were considered "waters of the State" if they discharge more frequently than a twenty five year, twenty-four hour storm event. See Petitioner's exhibits 13 & 15. Tamaron's stormwater system was built prior to Chapter 17-25, Florida Administrative Code, permitting requirements, and was designed to discharge at a ten year, twenty-four hour storm event which is more frequent than a twenty five year, twenty-four hour storm event. Discharge of water into Phillippi Creek from the subdivision's stormwater lakes is fairly frequent; however, the volume of the discharge is low. Phillippi Creek is a natural surface water which eventually flows into Roberts Bay. Roberts Bay is a specifically named water body in the Grizzle-Figg Amendment (Section 403.086(1)(c), Florida Statutes). Since September, 1989, Tamaron has retained William Murchie, P.E. of AM Engineering, to evaluate the design and operation of the facility in order to comply with appropriate regulatory requirements. The facility provides biological treatment through a contact stabilization utilizing an activated sludge. This process typically provides high quality advanced secondary biological treatment. A chemical feed tank system utilizing ferrous sulfate was added to the facility several years ago to chemically precipitate out total phosphorus to meet the advanced waste treatment requirements. High-level disinfection is achieved in the large chlorine contact chamber and through two tertiary filters. At the design flow of 0.155MGD, the chlorine contact chamber provides nearly 80 minutes of contact time, while actual contact time for existing flows, not including time in filters, is calculated at 110 minutes. Upon leaving the chlorine contact chamber and the biological treatment components of the facility, the chlorinated effluent is directed through two tertiary filters to reduce the biochemical oxygen demand (BOD) and total suspended solids (TSS). After the tertiary filters, the effluent passes through the sample block where it is sampled for TSS, BOD and chlorine and is then piped sequentially into the first, second and third percolation ponds. The percolation ponds span two acres and provide residence time of 35 to 45 days, during which time the effluent is further biologically treated and nitrogen is reduced. From the percolation ponds, the effluent is pumped into a low pressure system which uniformly distributes effluent over two nitrogen reduction filters. The nitrogen reduction filters are located north of the plant and are immediately adjacent to one of the subdivision's stormwater lakes. The nitrogen reduction filters consist of deep sand beds covered with Bermuda grass to provide high nitrogen uptake. The irrigation of the two nitrogen reduction filters is alternated every half day. These nitrogen reduction systems were modified in October/November, 1990, by adding 3 to 3 1/2 feet of clean sand with a permeability rate of 28 feet per day, planting Bermuda grass, and installing an irrigation/distribution system. These filters replaced two sand pits with shallow layers of very coarse sand, after initial testing demonstrated the sand pits to be inadequate in removing nutrients consistent with statutory requirements. In January, 1992, an underdrain system utilizing perforated pipe was installed in the nitrogen reduction filters to create an aerobic zone and to provide a representative sample port after nutrient reduction in the filters. This sample port, used for the biweekly monitoring, consists of a single solid pipe, that collects effluent from the perforated pipes, with a tap to prevent discharge into the adjacent stormwater lake, except during sampling events. The biweekly sampling event results in effluent being discharged from the pipe for approximately 30 minutes to flush the pipe so as to get a proper sample. The underdrain sampling port at the nitrogen reduction filters replaced two earlier monitor wells between the nitrogen reduction filter and the stormwater pond, which proved ineffective because of their location. The perforated underdrains are situated in filter bed sand of medium grain size with a permeability rate 100 feet per day and located below 3 - 3 1/2 feet of clean sand with a permeability rate of 28 feet per day and above very permeable layers of sand, stone and coarse shell. (See Tamaron's exhibit 23 and Department's exhibit 14) The very permeable layers of sand, coarse shell, the perforated pipe and the single solid pipe are all located above the ground water table. Since the perforated pipe and sample port are both located above the ground water level and the surface of the adjacent stormwater lake, it is unlikely that the effluent sample taken from the sample port would be influenced by the ground water or a back flow of water from the adjacent stormwater lake. The coarse shell layer situated below the nitrogen reduction filters extends to the edge of the adjacent stormwater lake. Therefore, the effluent, other than the effluent trapped in the perforated pipe and carried to the sample port, that is irrigated onto the nitrogen reduction filters passes through the sand and into the coarse shell layer. The effluent is then transported laterally through the coarse shell layer to the underground edge of the adjacent stormwater lake where there is a subsurface discharge into the adjacent stormwater lake. Since the discharge to the stormwater lakes is primarily subsurface in nature, the logical compliance point to measure effluent parameters would be the underground sample port which collects the effluent prior to subsurface discharge into the stormwater lake. See Petitioner's exhibit 15. The direction of ground water flow at the facility is towards the north to the adjacent stormwater lakes as evidenced by the hydraulic gradient of the site determined using ground water table elevations. The location for sampling effluent from the facility for compliance with secondary standards was described in Specific Condition 5 of Tamaron's previous permit No. D058-141783 dated August 23, 1988. Specific Condition 5 states that the discharge from the chlorine contact chamber shall be sampled in accordance with Chapter 17-19, Florida Administrative Code, (now Chapter 17-601, Florida Administrative Code), for compliance with the stated secondary limits. The facility's tertiary filters are located after the chlorine contact chamber. Tamaron samples effluent for compliance with secondary standards (BOD,TSS, chlorine) at the sampling box after disinfection and tertiary filtration. Tertiary filtration is designed to achieve a more efficient removal of TSS and BOD. The resulting effluent is usually of higher quality than secondarily treated effluent. A secondary plant with tertiary filtration is referred to as an "advanced secondary treatment" plant. Data presented by Tamaron titled Tamaron 1991-1993 Data On FDER Permit Compliance (Tamaron's exhibit 17, page 1 of 2) shows reported values, sampled after tertiary filtration at the sample box, which suggest that secondary treatment parameters, including fecal coliform, are not being exceeded. The data actually shows a very high removal rate for the parameters sampled. The United States Environmental Protection Agency issued a National Pollutant Discharge Elimination System (NPDES) permit, number FL0042811, to Tamaron for the facility with an effective date of June 1, 1991, which authorized Tamaron to discharge from the facility to the receiving waters named Phillippi Creek to Roberts Bay in accordance with the effluent limitation, monitoring requirements and other conditions set forth in the permit. Since the facility was located in the Grizzle-Figg Amendment area of Florida certain changes were made from the draft permit to the final permit. Those changes appear in the Amendment To The Statement Of Basis At The Time Of Final Permit Issuance which is made a part of the final permit. The amendment provides for changes in Part I, Effluent Limitations and Monitoring Requirements. These changes, among other things, require that the Grizzle-Figg Amendment annual limits of 5 mg/l BOD, 5mg/l TSS, 3mg/l total nitrogen and 1mg/l total phosphorus be added to the effluent limits to adequately maintain water quality standards, and added monitoring requirements and measurement frequency regulations to give the basis for permit limits and conditions in accordance with Chapters 17-302, 17-600 and 17-601, Florida Administrative Code. Data presented by Tamaron titled Tamaron 1991-1993 Data On NPDES Permit Compliance (Tamaron's exhibit 17, page 2 of 2) show reported values sampled after nitrogen reduction filters which suggest that the maximum values for AWT parameters, including fecal coliform, are not being exceeded, particularly after January, 1992, when Tamaron began sampling effluent collected by the perforated underdrains at the sample port. Tamaron has been monitoring and reporting compliance under its final NPDES permit and providing copies to the Department. There was no evidence that Tamaron was ever in violation of its NPDES permit. Tamaron submitted documentation to the Department with its permit application that demonstrated high-level disinfection within the facility was being achieved. However, TSS was being sampled after the application of the disinfectant. Using this procedure, the facility continued to achieve high- level disinfection until the permit denial. After the permit denial, the facility resumed basic disinfection which was required under Tamaron's permit for secondary treatment. This same data indicates that there was compliance with the requirements for fecal coliform. The record is not clear as to the frequency and number of samples taken to provide the data for reporting compliance with the NPDES permit and the data presented in Petitioner's exhibit 17, page 2 of 2. However, there was no evidence, other than sampling for TSS after the disinfectant was added, that Tamaron was not complying with its NPDES Permit that required, among other things, that the monitoring requirements and measurement frequency of the Department's rules and regulations be followed by Tamaron. Tamaron has modified and upgraded the facility in order to achieve a treatment process which will produce effluent of a quality for discharge under the Grizzle-Figg Amendment. Tamaron has provided reasonable assurances, although not absolute assurance, that the facility can comply with the discharge permit requirements of Chapter 403, Florida Statutes, including Section 403.086, Florida Statutes, notwithstanding the testimony of Jay Thabaraj to the contrary concerning Tamaron's sampling technique and its method of obtaining high-level disinfection which can be addressed as a specific condition, if necessary. Studies conducted by the Tamaron's engineer included in Petitioner's exhibit 21 indicates that there was no adverse impact to the stormwater lakes from the facility's wastewater treatment and disposal system. Tamaron has provided reasonable assurances that the point of discharge is a reasonably access point, where such discharge results only in minimal negative impact.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department enter a final order granting Tamaron an operating permit for its facility as secondary treatment facility. In the alternative, that the Department enter a final order granting Tamaron an operating permit for its facility that requires compliance with the advanced waste treatment criteria set forth in Section 403.086(4), Florida Statutes, that, in addition to any general or specific conditions that are normally required, contains specific conditions that: (a) contains specific instructions on sampling technique, sampling frequency and reporting as set forth in Rule 17- 740(1)(b)2., Florida Administrative Code, and (b) sets forth compliance with high-level disinfection, with a time limit for compliance, that accomplishes the intent of the rule, if not the strict letter of the rule, without total redesign of the facility. DONE AND ENTERED this 3rd day of May, 1994, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of May, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-2968 The following constitutes my specific rulings, pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Petitioner, Tamaron's Proposed Findings of Fact: The following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1(1); 2(2); 3(3); 4(5,6); 5(6); 6(7); 8(12); 10(8); 11-12(13-25,38); 13(31-34); 14(8); 15(13); 16(14); 17-18(15); 19(36); 20(16); 21(17); 22(18); 23(19); 24(20); 25(21);26(22); 32(32,7); 33(33); 34(32,32); 36(31); 39-40(34); 41(36); 42- 43(34); 44(35); 47(4); and 51(10). Proposed findings of fact 27-31, and 35 are conclusions of law rather than findings of fact.. Proposed findings of fact 45, 46, 48-50, 56, 57, 59, and 61-72 are arguments rather than findings of fact. Proposed findings of fact 7, 9, 37, 38, 52-55, 58 and 60 are neither material nor relevant. Respondent, Department's Proposed Findings of Fact: The following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1(1,6); 2(2); 3(4,10); 5(9); 6(9,10); 8(11); 9-17(18-27); 18(8); 19(13); 20(5); 21(17); 22(30); 23(31); 24(14); 25(17); 26(18-23); 27(34); and 32(35,38). Proposed finding of fact 4 is neither material nor relevant but see Findings of Fact 18-25. Proposed findings of fact 7, 31 and 33 are arguments rather than findings of fact. Proposed findings of fact 28-30 are conclusions of law rather than findings of fact. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Charles G. Stephens, Esquire C. Robinson Hall, Esquire Enterprise Plaza, Suite 1516 101 E. Kennedy Blvd. Tampa, Florida 33602 Francine Ffolkes, Esquire Office of General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400
The Issue The issue presented is whether Respondent Seanic Corporation's application for an operating permit for a domestic wastewater treatment facility should be granted.
Findings Of Fact On January 20, 1994, Respondent Seanic Corporation submitted to Respondent Department of Environmental Protection an application to construct a wastewater treatment and disposal facility. The application requested approval to construct a facility with a design capacity of 15,000 gallons per day and to discharge its treated effluent to G-III groundwater through two Class V injection wells. Although the Department had no rules with specific depth requirements for such wells, the plans that accompanied the application contemplated wells with a total depth of 90 feet below land surface, which would be cased down to a depth of 60 feet below land surface. On February 23, 1994, the Department gave notice of its intent to issue the requested construction permit. Petitioners did not challenge the issuance of the construction permit, and the Department issued the permit on April 22, 1994, with an expiration date of five years after the issuance of the permit. On February 17, 1999, Seanic began construction of the permitted facility, including the construction of the two Class V injection wells. At the time the wells were first drilled, there were no statutes or rules regarding the appropriate depth of underground injection wells at a facility like Seanic's. Construction of the Seanic facility was completed before April 12, 1999, as reflected by the Certificate of Completion of Construction for the permitted facility. On April 21, 1999, Seanic filed with the Department its application to operate the facility. Chapter 99-395, Laws of Florida, became effective on June 18, 1999, approximately two months after the facility was constructed and the operating permit application was submitted. Section 5 of Chapter 99-395 defines the term "existing" to mean "permitted by the Department of Environmental Protection or the Department of Health as of the effective date of this act." Chapter 99-395 imposes different effluent limitations for "existing sewage facilities" than those that are applied to new facilities. For facilities that have a design capacity of less than 100,000 gallons per day, new facilities must provide treatment that will produce an effluent that contains no more, on a permitted annual basis, than the following concentrations: Biochemical Oxygen Demand (CBOD5) of 10 mg/L Suspended Solids of 10 mg/L Total Nitrogen of 10 mg/L Total Phosphorus of 1 mg/L These standards are frequently referred to as the "10-10-10-1 Standard." In accordance with Section 6(4) of Chapter 99-395, "existing sewage facilities" have until July 1, 2010, to comply with the 10-10-10-1 standard. Prior to that date, "existing sewage facilities" must meet effluent limitations of 20 mg/L for both CBOD5 and suspended solids and must monitor their effluent for concentrations of total nitrogen and total phosphorus. The Seanic facility is an "existing" facility, as that term is defined in Chapter 99-395, and, therefore, has until July 1, 2010, to comply with the 10-10-10-1 standard. Section 6(7)(a) of Chapter 99-395 requires Class V injection wells for facilities like Seanic's to be "at least 90 feet deep and cased to a minimum depth of 60 feet or to such greater cased depth and total well depth as may be required by Department of Environmental Protection rule." The Department has not promulgated any rules requiring Class V injection wells to be deeper than the depth prescribed in Chapter 99-395, Laws of Florida. As of January 26, 2000, the total depth of Seanic's injection wells measured 92 and 94.5 feet, respectively. On November 24, 1999, the Department entered its notice of intent to issue the operating permit applied for by Seanic and attached to the notice a "draft permit" with the conditions and effluent limitations that would be applied to the facility. In issuing the notice, the Department determined that Seanic had provided reasonable assurance that the facility will not discharge, emit, or cause pollution in contravention of applicable statutes or the Department's standards or rules. The draft permit included effluent limitations of 20 mg/L for both CBOD5 and suspended solids and required Seanic to monitor its effluent for total nitrogen and total phosphorus, in accordance with Chapter 99-395, Laws of Florida, and the Department's rules for existing sewage facilities. The draft permit notes that Seanic must comply with the 10-10-10-1 standard by July 1, 2010. Because Seanic's condominium development has not been completed and the wastewater treatment facility is not expected to go into operation for approximately one year, the draft permit also requires that the facility be re-inspected and re-certified immediately prior to going into operation. The Seanic facility was designed to create an effluent that is several times cleaner than required by Department rules. The facility uses an extended aeration process that is expected to reduce levels of both biological oxygen demand ("BOD") and total suspended solids ("TSS") to lower than 5 mg/L, concentrations that are 75 percent lower than the effluent limitations in the draft permit. Similar facilities in the Florida Keys have shown that they can achieve BOD and TSS concentrations of less than 5 mg/L. The Seanic facility has also been designed to provide a greater level of disinfection than required by law. While the draft permit requires only that the facility maintain a chlorine residual of 0.5 mg/L after fifteen minutes' contact time, the facility has been designed with larger chlorine contact tanks to provide a chlorine contact time of approximately one hour at anticipated flow rates. The facility operator can also increase residual chlorine concentrations. These facts, along with the reduced TSS levels at this facility, will provide considerably greater levels of disinfection than the law requires. Although the draft permit does not contain effluent limitations for total nitrogen or total phosphorus, the levels of these nutrients expected to be present in the Seanic facility's effluent are approximately 5 mg/L and 2-3 mg/L, respectively. Studies conducted on the rate of movement of phosphorus in the subsurface indicate that some of the phosphorus is rapidly immobilized through chemical reactions with the subsurface soil matrix. Specifically, studies conducted on injection wells in the Florida Keys report that 95 percent of the phosphorus is immobilized within a short time after entering the injection well. Studies conducted on the rate of movement of nitrates in the subsurface indicate that some nitrate migration is also retarded through chemical reactions with the subsurface soil matrix. More specifically, studies conducted with injection wells in the Florida Keys report that denitrification removes approximately 65 percent of the nitrates within a short time after the effluent enters the injection well. In addition to the chemical reduction of phosphorus and nitrogen levels in the groundwater, studies conducted on injection wells in the Florida Keys with a total depth of 90 feet and a cased depth of 60 feet have reported extremely high dilution rates by the time effluent injected into such wells would appear in surrounding surface waters. More specifically, studies using chemical and radioactive tracers have reported dilution rates on the range of seven orders of magnitude, i.e., 10 million times. After undergoing chemical reduction in the groundwater as well as extremely high dilution rates, the levels of nitrogen and phosphorus that would be expected to enter Captain's Cove and the adjacent canals will be infinitesimal, i.e., less than one part per trillion. Such levels would be several orders of magnitude below detection limits of currently available analytical methods. The surface waters in the artificial canals and in Captain's Cove surrounding the homes of Petitioners' members are classified by the Department as Class III waters that are predominantly marine. The permitted levels of fecal coliform bacteria in the facility's effluent (as restricted in the draft permit) are identical to the discharge limits for fecal coliform bacteria in Class III waters that are predominantly marine. The operation of Seanic's facility will not result in discharges of fecal coliform bacteria in excess of the applicable effluent limitations. Petitioners' expert witnesses agree that the facility, as designed, will comply with all of the conditions and effluent limitations in the draft permit. No Department rule or standard will be violated by this facility. The Department has not promulgated any effluent limitations or standards for viruses to be discharged to G-III groundwater or Class III surface waters that are predominantly marine. Petitioners' members use and enjoy the clear waters in their canals and in Captain's Cove. They have had the water quality tested four times a year since 1988. Captain's Cove, along with the adjacent canals, has remained a clear, oligotrophic water body with minimal algae growth. Petitioners' members fear that the introduction of viruses and other microorganisms through the facility's effluent will cause swimming in Captain's Cove and the adjacent canals to be harmful to their health. Their fear has been heightened by newspaper stories about viruses and a publicized study which erroneously claimed that Captain's Cove had high levels of harmful bacteria. Petitioner Port Antigua Property Owners Association ("PAPOA") received notice of the Department's intent to issue an operating permit to Seanic. The president discussed the permit with another resident, a microbiologist, who in turn discussed the facility with geologists and reviewed studies performed in the Florida Keys. Their serious concern over the depth of the injection wells and the possible release of viruses and bacteria harmful to the marine environment and to the public health was expressed throughout PAPOA's petition, and a copy of one of the tracer studies upon which they relied was attached to the petition. The president of Petitioner Port Antigua Townhouse Association, Inc. ("PATA"), who is also a member of PAPOA, discussed the Department's notice of intent with the president of PAPOA and the microbiologist. He also discussed the project with a member of PATA who oversees Broward County's wastewater treatment facility, which has the same effluent limitations as the Seanic facility. PATA members believed they should join with PAPOA and the Lower Matecumbe Key Association in requesting a hearing on Seanic's operating permit. PATA and others have also filed litigation in the Circuit Court against Seanic Corporation and others. That litigation is still pending. Petitioners were not able to cite any statute or rule that would be violated by the Seanic facility's discharge. They believe that since the facility is not yet operating, it should be required to adhere to the stricter effluent standards required for new facilities. They also believe that the Department should consider the harmful effects of viruses and bacteria on the marine environment and on the public health. Petitioners did not file their petitions for any improper purpose. They did not file their petitions for any frivolous purpose or to harass or to cause unnecessary delay or to increase Seanic's costs in obtaining an operating permit for its facility. They believed the language in the Department's notice of intent to issue the permit which advises substantially affected persons that they have a right to an administrative hearing and that the Department could change its preliminary agency action as an result of the administrative hearing process. They believe they are simply exercising a right that they have under the law.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered granting Seanic's application for an operating permit for its domestic wastewater treatment facility but denying Seanic's Motion for Attorney's Fees and Costs. DONE AND ENTERED this 13th day of November, 2000, in Tallahassee, Leon County, Florida. LINDA M. RIGOT Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of November, 2000. COPIES FURNISHED: Francine Ffolkes, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Evan Goldenberg, Esquire White & Case, LLP First Union Financial Center 200 South Biscayne Boulevard Miami, Florida 33131-5309 Lee R. Rohe, Esquire Post Office Box 500252 Marathon, Florida 33050 Kathy C. Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-0300 Teri L. Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-0300
The Issue The issue in these consolidated cases is whether the agency should grant variances from Rule 10D-6, F.A.C. regarding construction of on-site sewage disposal systems on the lots in question.
Findings Of Fact Jerry Gagliardi is the developer and engineer for an 8-lot subdivision on Merritt Island, Brevard County, Florida. Mr. Gagliardi is a self-employed civil and mechanical engineer. The small subdivision has a long, narrow configuration, extending west to east. It is bounded on the north by an existing drainage ditch and a large tract of undisturbed wetlands. Its south boundary is a finger canal, and its east boundary is Pelican Creek. With the exception of the wetlands, most of the property in the area is already developed. There are no residences built yet on the eight lots. Hook-up to an existing sanitary sewer system is available within one- quarter mile of the subdivision. The entire area, with several finger canals, is served by the sanitary sewer system. Mr. Gagliardi planned to install on-site disposal systems (septic tanks) in the subdivision. When his plan was rejected he applied for variances for lots 1 and 2 in July 1992, stating economic hardship as the basis for the request. The applications were reviewed by Gregory D. Wright, Supervisor for Brevard County Consumer Health Services and his staff. Several site visits were made and a site evaluation was completed. Mr. Wright recommended denial of the variance because the sanitary sewer system is available; the soils (mostly sand and shell) are unsuitable for on- site disposal systems; and the area, virtually surrounded by water, is environmentally very sensitive. Mr. Wright is also concerned that a variance for the two lots will establish a precedent for variances on the remaining lots in the subdivision. Mr. Wright also observed that there is an existing irrigation well on a neighboring lot within thirty feet of the proposed septic tank on lot #1. This well does not appear on Mr. Gagliardi's plans. The Department of Health and Rehabilitative Services Review Group for Individual Sewage Disposal concurred with the local agency's recommendation after consideration of Mr. Gagliardi's hardship argument. The request was not considered to be a minor deviation from the minimum requirements of the law and regulations. For approximately three years Jerry Gagliardi has been providing information on his development plans to the local county staff. He has become extremely frustrated with the process. However, he has still failed to produce the evidence which he must have to justify the variances he is seeking. At the hearing, Mr. Gagliardi claimed that hook-up to the existing sanitary sewer system is impossible because there is insufficient elevation for gravity feed and there is not enough room on Banana River Drive for another sewer line easement. He did not submit evidence to support that claim and it is unclear whether he has made that claim to the local staff for their verification. He has consistently claimed that hook-up to the existing system is prohibitively expensive. He has estimated that the cost of installing hook-up to the existing system would be $52,642 for the entire subdivision, or $6580.25 per lot. He has estimated that installation of aerobic on-site septic systems would cost $28,000.00 or $3500 per lot. This estimate does not include the cost of culverting the ditch along the north boundary of the property. The culvert may be necessary to meet the water body set-back requirements and, assuming that a permit would be granted for its construction, the culvert would substantially increase the cost of the septic tank project. As recently as three weeks prior to hearing, Mr. Gagliardi provided information to the staff that the value of the lots in the subdivision is $60,000.00 each, for lots #1 through #6; and $115,000.00 and $120,000.00, for lots #7 and #8, respectively. At hearing he repudiated that information as being based on three year old appraisals. He now asserts that the value of the lots is closer to $40,000.00 each. Petitioner's exhibit #2 is a cover letter dated January 4, 1993, to Mr. Gagliardi from the Brevard County Property Appraiser. Attached to the letter are four property management print-outs reflecting the value of two lots as $35,000.00, and two others as $65,000.00. The record does not reflect which lots those are in the subdivision and there is no explanation for the inflated values provided to the staff after the printouts were received. It is impossible from the confused and conflicting evidence provided at hearing to determine that the petitioners are entitled to a variance.
Recommendation Based on the foregoing, it is hereby RECOMMENDED: that the agency enter its final orders denying Petitioners applications for variances. DONE AND RECOMMENDED this 11th day of May, 1993, in Tallahassee, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 1993. COPIES FURNISHED: Sonia Nieves Burton, Esquire Department of Health and Rehabilitative Services District 7 Legal Office 400 West Robinson Street, Suite S-827 Orlando, Florida 32801 Jerry Gagliardi, Agent for Phil Sperli and Gail Bobzein Post Office Box 541061 Merritt Island, Florida 32954 Robert L. Powell, Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Slye, General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700
The Issue The issue to be resolved in this proceeding concerns whether Petitioner is entitled to a variance so as to allow the installation of an on-site sewage disposal system (OSDS) on the Petitioner's property located in Dixie County, Florida.
Findings Of Fact The Petitioner is the owner of Lot 24 of Hatchbend Upon Suwannee subdivision, a platted subdivision in Dixie County, Florida. The Petitioner purchased the lot for residential purposes and seeks to install an on-site sewage disposal system (septic tank) (OSDS) on that lot for purposes of serving a single family residence. The Petitioner originally filed a permit application seeking a permit authorizing installation and operation of an OSDS for that property. That permit application was filed on December 12, 1989. It was denied and the Petitioner sought a formal hearing before the Division of Administrative Hearings to contest that denial, which became Case No. 90-6134. That case was ultimately settled between the Petitioner and the Department and no permit application was granted. Instead, the Petitioner filed the subject application for a variance from the requirements of then Section 10D-6.047(6), Florida Administrative Code. The variance application was filed on June 21, 1991, with regard to Lot 24 only. By letter of October 9, 1991, the Department denied the application for variance and the Petitioner timely requested a hearing pursuant to Section 120.57(1), Florida Statutes, to contest that denial. Lot 24 of Hatchbend Upon Suwannee subdivision, owned by the Petitioner is located on the Suwannee River. The Petitioner submitted a report of the Suwannee River Water Management District, in evidence, which indicates that the subject property lies within the regulatory floodway of the Suwannee River. The two year flood elevation at that location is 19 feet above mean-sea level (MSL). The ten year floor elevation at the installation site is 29 feet above MSL. The elevation of the proposed septic tank system installation site is 17.5 feet above MSL. Department personnel performed an inspection and an evaluation of the site. It was thus found and established by testimony and evidence, presented through witness Fross, that the water table level during the wet season is at or above the surface of the property at the installation site and the dry season water table level is approximately 6 inches below the surface grade of the property at the installation site. This is the reason, together with the fact that the property lies within the regulatory floodway and beneath the ten year flood evaluation of the Suwannee River for the river mile at the site, that the inspector recommended denial of a permit for an OSDS for the property. The Petitioner maintained that the information originally submitted and obtained from the Suwannee River Water Management District had incorrectly indicated the river mile at the site. The ten year and two year flood elevations are calculated according to the river mile at a given site, river miles being measurements of the linear distance of the Suwannee River and the Suwannee River floor plain. However, if the lower ten year flood elevation prevailing at the river mile the Petitioner maintained equated with the project site was applicable, by the Petitioner's own admission, the site in question (and indeed any location on any of the nearby lots he owns) would be below that resulting ten year floor elevation level. Ms. Emily Wilson testified on behalf of the Respondent. It was established that the education, experience and certification of Ms. Wilson as a registered sanitarian, together with her graduate and post-graduate degrees in the area of environmental science, accord her expertise in the areas of environmental protection, sewage disposal and sanitation and she was accepted as an expert in those fields. It was thus established that installation and operation of a septic system on the Petitioner's property would pose a threat to the ground and surface water in the vicinity of the site due to the high water table levels and the fact that the property, including the proposed installation site, is subject to frequent flooding. The exposure of the septic tank drainfield to ground or flood waters would allow the release of pathogens into those waters, which could be carried along into the ground or surface waters when the flood receded. These pathogens would endanger the health of the Petitioner, surrounding land owners and other persons through contamination of the drinking water supply. The pathogens could also endanger persons using the river for recreational purposes. The Department produced photographs which were introduced into evidence establishing that the road leading to the property was underwater due to flooding in the spring of 1991. That road runs along the back of the Petitioner's property and is further removed from the river than the actual installation site where the Petitioner proposes to install a septic system. After the flood receded, the water marks on the trees in the area of the proposed installation site on the Petitioner's property indicate that the area had been submerged under approximately three feet of water. The property was established to be subject to frequent flooding. Ms. Wilson is aware that other systems can potentially be used to adequately contain and treat sewage generated by a residence such as that the Petitioner envisions, including a closed system characterized by no sewage discharge. The applicant however has not submitted a proposal for such a system for consideration by the Department. She is unaware of any other system of sewage disposal that has previously been approved for use in low areas similar to that prevailing at the Petitioner's property and installation site. The Petitioner purchased the property under a contract for deed. The contract for deed specifically states that the property was subject to frequent flooding at the time the Petitioner purchased the property and the Petitioner was aware of that. The Petitioner purchased the property in spite of that representation in the contract for deed. The construction and use of a mounded septic tank and drainfield system designed to elevate the septic tank and drainfield a sufficient required distance above the groundwater table and the ten year flood elevation level could potentially be installed, but the system would require a very large, high mound. It was not shown that the dimensions of the lot would permit the installation of the required mound base pad, and mound itself, of a sufficient size to properly elevate the proposed system so that a permit could be approved. The mounded system required under proper design parameters provided for in the Department's rules would cause the mounded system to approach or even exceed the entire width of Lot 24. A mounded system located in the regulatory floodway, as Petitioner's property is located, would require issuance of a separate permit from the Suwannee River Water Management District. There was no showing that the Petitioner sought such a permit nor any showing of the likelihood that such a permit could be granted at the time of the hearing. Additionally, the Department's rules require that a qualified engineer issue a certification with respect to the use of a mounded disposal system within the regulatory floodway which certifies that the insertion of fill material for constructing such a system in the floodway will not cause a rise in the level of the "base flood", also known as a "zero rise certificate." No such certification has been obtained. In order to establish compliance with the requirement for granting of a variance set forth in the legal authority cited below, the applicant must establish, among other things, that there is no reasonable alternative to the installation of the system proposed. The applicant has presented no evidence to show that there are no reasonable alternatives to the system proposed. Rather, the testimony and evidence indicates that indeed there may be alternative disposal systems and methods available, although the proof was not developed in this proceeding to establish what those might be. The consideration of another location for the system on a different lot or installation site presently owned by the Petitioner or of an alternative type of treatment and disposal system might be feasible but would require a new site evaluation and submission of appropriate information which could establish that a specific alternative system and/or location is feasible, in terms of the requirements in the statute and rules that no deleterious impacts to the ground or surface waters in the vicinity of the site would occur. Such an effort would have to be the subject of a separate permit application and is not at issue in this variance proceeding.
Recommendation Having considered the foregoing findings of fact and conclusions of law, the evidence of record, the candor and demeanor of the witnesses and pleadings and arguments of the parties, it is therefore RECOMMENDED: that a Final Order be entered denying the Petitioner's application for a variance from the statutory and rule requirements related to permitting, for the reasons found and concluded above, which denial should be without prejudice to a later permit application which might offer full consideration of potential, reasonable alternative sewage treatment and disposal systems and methods in the manner envisioned in Rule 10D-6.0471, Florida Administrative Code and other pertinent rules. DONE and ENTERED this 24th day of August, 1992, in Tallahassee, Florida. P. MICHAEL RUFF, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of August, 1992. APPENDIX Respondent's Proposed Findings of Fact: All proposed finding of fact are accepted. The Petitioner presented no Proposed Findings of Fact but rather a posthearing pleading constituting, in effect, a closing legal argument. COPIES FURNISHED: Robert G. Prior 3106 Waverly Avenue Tampa, Florida 33269 Ralph J. McMurphy, Esquire 1000 Northeast 16th Avenue Gainesville, Florida 32609 Sam Power, Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Slye, General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700
Findings Of Fact On or about December 28, 1987 Hy Kom filed with the Department an application for a permit to construct a .0126 MGD Advanced Waste Water Treatment Plant on Emerson Point, Snead Island in Manatee County. The proposed waste water treatment plant would discharge effluent into the waters of Terra Ceia Bay in Manatee County. The proposed waste water treatment plant would discharge effluent into the waters of Tampa Bay in Manatee County. The proposed waste water treatment plant would discharge effluent into the waters of Manatee River in Manatee County. The waters of Terra Ceia Bay have been designated Outstanding Florida Waters (OFW) by the Department. On or about April 27, 1989 the Department issued a Notice of Permit Denial concerning Hy Kom's permit application. The parties stipulate the Intervenor, Manasota-88, has standing to intervene as a party Respondent and to object to the issuance of the permit. Petitioner's evidence can best be summarized by what was not submitted. First, the expert witness called to identify the application had not prepared any part of the application or verified any of the studies presented therein. Similarly Petitioner's expert on the proposed treatment plant did not testify that Petitioner was committed to using this plant, or that the construction of the plant and the operation of the plant would comply with statutory and rule requirements. The only witness called by Petitioner to testify to the effect the discharge from the proposed advanced waste water treatment plant would have on the receiving waters was also Respondent's expert; and this witness testified that the effluent discharge from this proposed plant would have an adverse effect on the receiving waters, would seriously degrade the receiving waters as a nursery habitat for both crustacea and fishes endemic to the area, and that no reasonable assurances that this would not happen were ever presented by the Petitioner. This witness further testified that no discharge into these receiving waters would be acceptable not only because of the nitrogen level (which was the most significant reason for denying the permit) but also because even a discharge of absolutely pure water would upset the salinity of the receiving waters at the critical time the receiving waters act as a marine nursery.
Recommendation It is RECOMMENDED that a Final Order be entered denying the application of Hy Kom Development Company, for a permit to construct and operate an advanced waste water treatment facility at Emerson Point, Snead Island, Manatee County, Florida. DONE and ORDERED this _15th_ day of September, 1992 in Tallahassee, Leon County, Florida. COPIES FURNISHED: JAMES W. STARNS ESQ 501 GOODLETTE RD SUITE D-100-24 NAPLES FL 33940 W DOUGLAS BEASON ESQ ASST GENERAL COUNSEL K. N. AYERS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this _15th_ day of September, 1992. DEPT OF ENVIRONMENTAL REGULATION 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400 THOMAS W REESE ESQ 123 EIGHTH ST N ST PETERSBURG FL 33701 DANIEL H THOMPSON ESQ GENERAL COUNSEL DEPT OF ENVIRONMENTAL REGULATION 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400 CAROL BROWNER SECRETARY DEPT OF ENVIRONMENTAL REGULATION 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400
Findings Of Fact The Department of Transportation, pursuant to its decision to procure certain sewer line cleaning equipment, issued an Invitation to Bid to potential vendors of such equipment. The specifications in that Invitation to Bid which are at issue in this proceeding concern the specified ability of the machine being proposed to vacuum gutters while being driven or, that is, in motion. The other specification at issue was that the machine had to be a standard production model with five of such machines in service for one year prior to May 1988. The sewer line cleaner specified had to have a nine cubic yard capacity. The bids were received, including that of Vac-Con, Inc. and Jet Vac Sanitary Service. The bid results were posted on June 3, 1988, noticing the Department's intent to award the contract for the nine cubic yard sewer line cleaner to Vac- Con, Inc. Jet Vac Sanitary Service timely filed a formal protest of that intended bid award on June 17, 1988. The Petitioner's formal protest was transmitted to the Division of Administrative Hearings and duly came on for hearing. The Petitioner is contending that the Vac-Con model V290 storm sewer line cleaner does not meet the specifications in the Invitation to Bid because it will not vacuum gutters while in motion in the configuration set forth in Vac-Con's published specifications for its standard models. It asserts, in conjunction with this argument, that the alternative configuration proposed by Vac-Con would in effect render this a nonstandard production model of which Vac- Con has not had five in service prior to May 1988, which would represent a departure from the bid specifications and thus result in a non-responsive bid. The Respondent, however, contends that the alternative configuration proposed by Vac-Con is merely an options package to an existing standard production model machine and thus is in conformance with the specification. The Respondent has been advised by Vac-Con that the V290 machine will perform as specified and that at least five machines have been so configured and have been in service for the required one year or greater period. It is stipulated that Jet Vac Sanitary Service was the next lowest bidder after Vac-Con and has standing to protest the Intent to Award. Jet Vac was a responsive bidder. It is also stipulated that the configuration of the model V290 depicted in Vac-Con's promotional material itself will not meet the specifications set forth in Respondent's Invitation to Bid. The dispute is whether the Vac-Con machine, as optionally modified, as proposed by Vac-Con, meets the specification concerning the machine being a standard production model. In response to the Invitation to Bid, Vac-Con, Inc. submitted a bid for its Vac-Con model V290. It accompanied that bid with a written statement of the model specifications which coincided with the specifications required by the Invitation to Bid. It specified, that is, that it would comply with the requirement that the vehicle be able to vacuum gutters while being driven in motion. Jet Vac in turn submitted a bid which was responsive, but it was not the lowest bid. Vac-Con, Inc., in other bids submitted in the past year as well as in its advertising literature, describes the V290 model of sewer line cleaner as one in which the vacuum compressor is driven by the truck engine, that is the engine which provides the motive power to the vehicle. In order to operate the vacuum compressor as described in that literature, the rear axle of the truck has to be disengaged, with the result that the unit cannot vacuum and drive at the same time. This configuration of the V290 model which has the vacuum being operated by the truck engine or chassis engine, is the normal type of unit offered by Vac-Con in its vehicle demonstrations and literature, as recently as one week prior to trial. In order for the V290 to comply with the bid specifications at issue, it must be reconfigured so that the vacuum compressor is run by an auxiliary engine and not the motive power engine. The power available to operate the vacuum compressors which vacuum trash from gutters and so forth, would be reduced from the chassis engine which, in the normal configuration of that model, operates the vacuum compressors. The reconfiguration whereby the vacuum compressors would be run off the auxiliary engine, and not the motive engine, would require a reversal of the V-belt drives used by the normal unit. This alternate configuration would be obvious to the casual observer. The intent of the term "standard production model" in the specifications at issue is to ensure that a machine purchased will have ready availability of manufacturer's replacement parts out of stock. This serves to prevent the purchaser from having to do development work on new models which are not in standard production runs and do not have inventories of spare parts in the manufacturer's stock as yet. Because the alternate configuration of the unit, whereby it would vacuum while moving, running its vacuum equipment off of its auxiliary engine, requires new engineering and reevaluation of the power of the V290's auxiliary motor, the specification language requiring a "standard production model" and requiring that five such units be operational in the field, requires in this instance that five units in the alternate configuration at issue be found to have been in satisfactory field service for one year. The written description submitted by Vac-Con, Inc. in response to the bidding documents, describes a machine which complies with the specification requiring the ability of the machine to vacuum while it is in motion. That description was specially prepared for purposes of this bid. Indeed it is not a machine represented, at the time of the bid, in the company's advertising literature, catalog data or other published brochures and like sources of information in order to verify that indeed Vac-Con did have five units in the alternative configuration in satisfactory service. The Department's representative, Mr. Burt, telephoned individuals whose names had been supplied him by Vac-Con as being persons who could verify that the alternative, which could vacuum in motion with the vacuum blower run off the auxiliary engine, was indeed in service. Using these names supplied him by Vac-Con and names of persons some of those people in turn gave him, who had such altered machines operating in satisfactory service, Mr. Burt telephoned each of the individuals whose names had thus been furnished by Vac-Con and its customers. He thus confirmed that there were indeed at least five units in service in the field, for at least one year, which had the ability to vacuum gutters while in motion, with the vacuum equipment being operated by the auxiliary engine on the machine. The Department has a policy of relying upon the representations of its suppliers. It does not inspect each piece of equipment before it writes a purchase order after awarding a bid. It instead reserves the right to reject any piece of equipment that does not meet specifications, after purchase. The Department does not wish to get into an adversary relationship with its suppliers and, in turn, vendors typically do not want an adversary or unfavorable relationship with the Department and do not want future disqualifications from bidding based upon any lack of integrity or misrepresentations in responding to bid specifications. Accordingly, the representations made on the bidding document have historically been quite accurate and have a high degree of probability of reliability. Hence, the Department has not, in the exercise of its discretion, followed a policy of physically inspecting each piece of equipment and independently verifying its existence or capabilities. It rather has effectively, in the past, relied upon the vendor's representations regarding the capacities or capabilities of equipment. In fact, the Department has neither the staff nor the time to make any further pre-award investigations, especially due to the nationwide market and indeed, to some extent, international market, in which it seeks to procure equipment of all sorts. In any event, being satisfied that the equipment would perform as represented and verifying that at least five such configured machines were in active field service for a year or more, the Department concluded that, in the exercise of its discretion, that the specifications had been adequately responded to and that the award should be made to Vac-Con as lowest, most responsive bidder. Insufficient proof to the contrary was offered at the hearing.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is, therefore RECOMMENDED that a Final Order be entered awarding the contract for Florida DOT Bid Number MY3188B5 to Vac-Con, Inc. DONE and ENTERED this 8th day of December, 1988, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of December, 1988. COPIES FURNISHED: Ray Heath William B. Singleton Jet Vac Sanitary Services Post Office Box 186 New Smyrna Beach, Florida 32070 Bruce A. Campbell, squire Senior Litigation Attorney Office of General Counsel Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450 Kaye N. Henderson, P.E., Secretary ATTN: Eleanor F. Turner, M.S. 58 Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450
The Issue The issues are whether Respondent violated Florida Administrative Code Rules 64E-6.022(1)(b)2., 64E-6.022(1)(d), and 64E-6.022(1)(p) by repairing an onsite sewage disposal system without a permit, resulting in missed inspections, and if so, what penalty should be imposed.
Findings Of Fact Petitioner is the state agency charged with enforcing the statutory and regulatory provisions pertaining to the practice of septic tank installations and repairs in Florida. See § 381.0065(3), Fla. Stat. (2003). Repair of onsite sewage treatment and disposal systems must be performed under the supervision and control of a registered septic tank contractor. Respondent is the qualifying registered septic tank contractor for All Florida Septic Tank Service, Inc., having been issued the registration number SR00011389. Respondent has 15 years of experience in the field of septic system construction and repair. The qualifying registered septic tank contractor for Simmons Septic and Tractor Service, Inc., is Joey Wayne Simmons. The qualifying registered septic tank contractor for AA Septic Tank Service, Inc., is Billy Wayne Joyner. However, Mr. Simmons, Mr. Joyner, and Respondent work closely together, sometimes working together on a job and/or acting as the qualifying registered septic tank contractor on each other's behalf. On September 2, 2003, the septic disposal system at the residence of Jack Young was not functioning properly. Mr. Young contracted with one of the above-referenced septic tank services to repair the system. On September 2, 2003, Respondent and another employee of All Florida Septic Tank Service, Inc., along with two employees from AA Septic Tank Service, Inc., went to Mr. Young's residence to repair Mr. Young's onsite sewage disposal system. No one applied for a permit to make any repairs to Mr. Young's system. With Respondent acting as the registered septic tank contractor, the men used a backhoe to dig up the septic tank, which was buried three feet in the ground. Respondent then repaired the pump and ran a new one and one-quarter force main line to the existing header because the old line had been compromised by roots. Respondent also cleaned roots from inside the distribution box. Respondent then sealed the tank and directed the men to cover it up. No one called Petitioner's local office, the Duval County Health Department, to request an inspection of the repair before covering the tank. The work on Mr. Young's septic system involved the replacement of an effluent transmission line. It required a permit because it constituted more than a minor repair to the pump and distribution box. Respondent should not have performed the work without a permit from the Duval County Health Department. Because there was no permit, there was no request for inspection by the Duval County Health Department. When the work was completed, Mr. Young gave Respondent a check in the amount of $1,000, payable to Mr. Simmons. The check reflected payment for repair to the filter bed, otherwise known as the drainfield. Respondent indicated his receipt of the check by signing the AA Septic Tank Service, Inc.'s Daily Truck Log and Maintenance Report. In February 2004, Mr. Young's septic system began to fail once again due to root blockage in the lines. Respondent advised Mr. Young that a permit would be required in order to make any further repairs. Mr. Young refused to pull a permit or to pay for any additional costs. On February 17, 2004, Mr. Young contacted Petitioner to report the failure of his system's drainfield. On February 18, 2004, Petitioner's inspector confirmed that Mr. Young's drainfield had failed and was causing a sanitary nuisance. During the hearing, Respondent admitted that there are no disputed issues of material facts in this case. He stated that he agreed with everything. However, he did not agree that the work he performed for Mr. Young required a permit from and inspections by Petitioner's Duval County Health Department.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That Petitioner enter a final order, finding that Respondent violated the standards of practice and imposing an administrative fine in the amount of $1,000. DONE AND ENTERED this 6th day of December, 2005, in Tallahassee, Leon County, Florida. S SUZANNE F. HOOD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 6th day of December, 2005. COPIES FURNISHED: Catherine R. Berry, Esquire Department of Health 515 West Sixth Street Jacksonville, Florida 32206-4311 James L. Smith All Florida Septic Tank Service, Inc. 8300 West Beaver Street Jacksonville, Florida 32220 R. S. Power, Agency Clerk Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701 Timothy M. Cerio, General Counsel Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701 Dr. John A. Agwunobi, Secretary Department of Health 4052 Bald Cypress Way, Bin A00 Tallahassee, Florida 32399-1701
The Issue The issues to be resolved in this proceeding concern whether the Petitioner is entitled to a permit permitting installation of an on-site sewage disposal system (OSDS) on his property located in Dixie County, Florida, in the vicinity of the Suwannee River and whether he is entitled to seek a variance from the statutes and rules concerning permitting of such systems.
Findings Of Fact The department hereby adopts and incorporates by reference the findings of fact set forth in the Recommended Order.
Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is therefore RECOMMENDED: That a Final Order be entered denying the Petitioner's application for an OSDS permit, without prejudice to the applicant applying for and seeking a variance from the statutory and rule requirements related to permitting for the reasons found and concluded above, and without prejudice to applying for and pursuing an OSDS permit application should the applicant, at a later time, be able to demonstrate that alternative methods of treatment and disposal of the sewage effluent at issue can feasibly be performed, within the bounds of the standards enunciated in the above-cited statutes and rules concerning on- site sewage disposal permitting. DONE and ENTERED this 21st of December, 1990 in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of December, 1990. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 90-2487 PETITIONER'S PROPOSED FINDINGS-OF FACT Accepted. Accepted. 5-14. Accepted. RESPONDENT'S PROPOSED FINDINGS OF FACT 1-7. Accepted. COPIES FURNISHED: Sam Power, Agency Clerk Department of HRS 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Linda K. Harris, Esquire General Counsel Department of HRS 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John K. McPherson, Esquire 22 South Main Street Gainesville, FL 32601 Frances S. Childers, Esquire Assistant District III Legal Counsel Department of HRS 1000 Northeast 16th Avenue Gainesville, FL 32609 =================================================================
The Issue The issues in this case are: Whether Mr. Decker had an improperly maintained septic system on his property. Whether Mr. Decker illegally repaired his on-site sewage treatment and disposal system. Whether the Department of Health properly issued a citation to Mr. Decker for violation of Sections 381.0065(4) and 386.041(1)(b), Florida Statutes.
Findings Of Fact On April 25, 1997, an employee of the Department of Health, Volusia County Health Department, David Stark, inspected Mr. Decker's property known as Bulow Creek Farm. Mr. Decker provides low-cost rental housing on this property which utilizes an onsite well to provide drinking water. Mr. Stark observed a wet area in the ground with the smell of sewage near the building identified as Apartment Building C, which houses seven (7) apartments. Mr. Stark identified this area as a sewage leak. On May 28, 1997, Mr. Stark returned to Mr. Decker's property with another Volusia County Health Department employee, Ed Williams. They both observed a wet area in the ground with the smell of sewage in the vicinity of the septic tank serving Apartment Building C. Mr. Stark identified this area as a sewage leak. Mr. Stark issued a Notice of Violation (NOV) to Mr. Decker which stated the raw sewage leak was a sanitary nuisance and provided that Mr. Decker should have his drainfield repaired in accordance with the repair permit Mr. Decker had previously obtained from the Department. The NOV stated the repair should be completed no later than June 11, 1997. A repair permit is valid for a period of eighteen (18) months. Mr. Decker's permit expired on April 20, 1997. Repairs must be inspected by the Department as they are made. On June 13, 1997, Mr. Stark mailed Mr. Decker a letter reiterating the need for repair of his septic system and enclosed a Notice of Intended Action giving Mr. Decker a deadline of June 20, 1997 to make the needed repairs. Mr. Stark received a letter dated June 29, 1997, from Mr. Decker, informing him that Mr. Decker, himself, had repaired the drainfield for Apartment Building C. The letter described the new tank and drainfield which Mr. Decker had installed, and Mr. Decker stated his repair was a "cheaper version of what you wanted me to do in the first place." Mr. Decker had not sought the required inspections for the repairs which he had made to the septic system, and the repairs were not inspected and approved by the Department. The Department cited Mr. Decker for having an improperly built or maintained septic system, and for failing to repair the system in accordance with the terms of the permit. The citation levied a $500 civil fine for Mr. Decker's violation.
Recommendation Based upon the findings of fact and conclusions of law, it is RECOMMENDED: That the Department issue a final order affirming the civil penalty against Mr. Decker and requiring Mr. Decker to repair his septic system according to permit. If Mr. Decker fails to effect the repairs, the Department should initiate action to abate this public health hazard. DONE AND ENTERED this 6th day of March, 1998, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 6th day of March, 1998.