CONSTRUCTION INDUSTRY LICENSING BOARD vs. NORMAN RIVERS, 77-000474 (1977)
Division of Administrative Hearings, Florida Number: 77-000474 Latest Update: Nov. 09, 1977

The Issue The basic allegations of the complaint having been proven or admitted, the sole question at hearing was one of mitigation.

Findings Of Fact Rivers is a licensed general and a licensed pool contractor. All the complaints against Rivers arose in relationship to his pool contracting activities. Rivers did begin construction of two pools in Levy County without first obtaining a building permit as required by the Levy County Building Code, a certified copy of which was identified by the Levy County Building official. Rivers paid a late fee in both instances. Although in one instance all inspections were made, in the second instance no inspections were possible because construction was essentially complete when the construction was discovered by the Levy County Building official. Rivers did fail to pay materialmen on two pools although he received payment in full for the jobs. His failure resulted in materialmen's liens being placed on the property, although Rivers provided each owner a written statement that all bills had been paid. Rivers admitted that he had not paid the materialmen because he lacked funds to do so. His contract with both parties for construction of a specified pool contained a provision stating that he would provide them an affidavit that all labor and material had been paid prior to receipt of final payment on the contract.

Recommendation Based upon the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Residential Pool Contractor's License and General Contractor's License of Norman Rivers be suspended for a minimum of ninety (90) days and that thereafter be reinstated upon his satisfying the Board of his ability to meet his financial obligations. DONE and ORDERED this 15th day of September, 1977, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488 9675 COPIES FURNISHED: Mr. J.K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 Mr. Norman Rivers 1710 South East 19th Street Ocala, Florida 32670

# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JOHN H. HOLLAND, 79-002059 (1979)
Division of Administrative Hearings, Florida Number: 79-002059 Latest Update: Aug. 28, 1980

Findings Of Fact Respondent is the holder of currently active General Contractor's license No. RG-0023888. On January 18, 1977, Norwood W. Hope (hereinafter "Developer") entered into a contract with Respondent for the construction of a commercial swimming pool. Respondent was to have been paid the amount of $43,346.40 under the contract for construction of the pool. The contract amount was to be paid pursuant to a five-stage draw schedule as follows: 1. Framing and steel draw paid $10,836.60 2. Gunite draw paid 10,836.60 3. Mancite draw 7,224.40 4. Equipment set draw 7,224.40 5. Final approval draw 7,224.40 Respondent made application for an Alachua County building permit for the swimming pool project on February 23, 1977. The permit application was approved on February 25, 1977, and a building permit was issued. Thereafter, the project received Alachua County approval on a temporary power pole inspection on June 1, 1977. An interim inspection of the property was made by Alachua County officials on November 7, 1977, with no deficiencies noted. A final inspection on the electrical work on the project was made, with satisfactory results, on November 8, 1977. The Alachua County Building Code, by incorporation of the 1973 Southern Standard Building Code, 1974 Revision, provides, in part, as follows: 108.2--INSPECTIONS REQUIRED The Building Official shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building or structure upon completion, prior to the issuance of the Certificate of Occupancy, as required in Section 109. * * * (c) The Building Official upon notifica- tion from the permit holder or his agent shall make the following inspections of buildings and such other inspections as may be necessary, and shall either approve that portion of the construction as completed or shall notify the permit bolder or his agent wherein the same fails to comply with the law: * * * Final Inspection: To be made after the building is completed and ready for occupancy. (Emphasis added). The contract entered into on January 18, 1977 between the Developer and Respondent called for Respondent to construct the swimming pool according to the plans and specifications admitted into evidence as Petitioner's Exhibit No. 1. Associated construction, including construction of concrete pool decking, a pumphouse and a fence surrounding the swimming pool site were either completed by the Developer or by other sub contractors. By invoice dated October 12, 1977, Respondent requested a final draw on the project in the amount of 87,000, which, if paid, would have left only $224.40 unpaid under the contract. This draw request indicated that a balance due for extra time and materials would be billed ". . . upon acceptance of total pool." (Respondent's Exhibit No. 4). On October 25, 1977, the Developer paid $6,000 of the $7,000 requested to be paid by Respondent's invoice of October 12, 1977. The Developer contested Respondent's expressed intention to bill for additional time and material, asserting that the Developer had not approved any additional sums for extras. In remitting the $6,000 payment to Respondent, the Developer indicated that "[t]his leaves a balance on our account of $1,224.40, which will be paid upon checking out the pool." (Respondent's Exhibit No. 2). (Emphasis added.) An invoice for back charges on the swimming pool project in the amount of $274 was forwarded to the Developer by Respondent by invoice dated November 8, 1977. In addition, on November 8, 1977, Respondent also invoiced the Developer for a final draw on the project in the amount of $1,224.40. At some time after notification from the Developer's representatives that tile targets in the racing lanes of the pool were improperly located, Respondent returned to the job site after November 9, 1977 to relocate the targets. Respondent performed this work as a result of a written request from the Developer dated November 9, 1977. Respondent completed primary construction of the pool prior to submission of the final draw request of October 12, 1977. At that time, back- filling around the exterior of the pool structure preparatory to the pouring of the concrete pool decking had not been completed. Although by October 12, 1977, Respondent had removed much of the excess dirt and debris from around the edges of the pool. There were still areas of exposed piping which would, in due course, be covered with back-fill and tamped by the decking subcontractor. Respondent did not attempt to back-fill or tamp any areas around the pool's piping system. At some time subsequent to October 12, 1977, which date is not clearly reflected in this record, a separate sub- contractor completed back-filling work around the pool, and poured the concrete decking. Neither the Developer nor his subcontractor advised Respondent that the back-filling had been accomplished and that the deck was to be poured. Prior to October 12, 1977, Respondent "pressure tested" the pool's piping system, and determined that the pool would hold water at a level above its scum gutters. The results of this testing indicated that, at least as of October 12, 1977, there was no leakage from the pool. Standard practice in the pool construction industry dictates that a minimum of three pressure tests be made of a pool's piping system during the course of construction. The first of these tests should occur immediately after installation of the pipes, and a second test should be performed immediately before final back-filling to cover the pipe system. A final pressure test should be conducted after tamping of the fill and prior to the pouring of concrete for the pool deck. The obvious purpose of this system of pressure testing is to discover any water leaks before concrete pool decking is poured to avoid having to cut out sections of the concrete in order to locate leaks. Because the Developer and his subcontractor failed to notify Respondent of further work being done on the pool. Respondent was unable to perform a pressure test either after back-filling was completed, after the back- fill had been tamped and before the concrete deck was poured. By letter dated January 17, 1978, Respondent was furnished by the Developer with a "punch list" indicating several areas of deficiency that needed to be corrected in the pool. In that letter the Developer requested that Respondent complete the necessary work within seven days. The Developer forwarded a second letter to Respondent dated February 23, 1978 advising Respondent that the punch list items had not been corrected, and urging Respondent to complete the work described in the punch list as soon as possible. From receipt of the punch list in January of 1978 through the middle of March, 1978 Respondent had workers on the job intermittently making the corrections indicated in the punch list. Respondent satisfactorily corrected fifteen of the eighteen items listed as defective n the punch list. Some of the items were repaired by other subcontractors. Respondent had difficulty obtaining some items of equipment, which he was required to back-order. When the back-ordered equipment was slow in arriving, the Developer opted to obtain these items from a source other than Respondent. Respondent replaced a defective pump associated with the pool construction at some time subsequent to January 18, 1977. The last work performed by Respondent on the pool project occurred some time between March 10 and March 16, 1978. At no time thereafter was Respondent ever advised by the Developer that any work performed under the contract was either unsatisfactory or incomplete. The pool received a final State of Florida, Department of Health and Rehabilitative Services inspection on July 13, 1978, at which time all necessary permits for operation of the pool under applicable regulations were issued. Respondent at no time requested that Alachua County officials come to the job site to conduct the necessary final inspection of the project, nor did he advise the Developer of the necessity to do so. At some time during 1979, subsequent to the completion of the swimming pool project, the Developer discovered that the pool was losing water at a rate of approximately 2,100 gallons per day. During this period, the water level inside the pool would drop to a level equal to the piping running around the exterior of the pool shell and under the pool decking. When the Developer was unable to ascertain the cause of the leak, an outside subcontractor was hired to check the pool. This sub- contractor performed pressure tests on the pool's piping system in an attempt to determine whether the leakage was occurring through the pipes. These tests apparently showed no leakage through the piping system. The Developer then caused the concrete decking around the edge of the pool to be removed in order to more closely inspect the interior piping. At this point it was discovered that there existed flaws and breaks in the neoprene piping surrounding the exterior shell of the pool. After repairs to the damaged piping, the pool decking was repoured and there has been no subsequent leakage problem in the pool. The Developer incurred expenses in the amount of $2,288 in removing the decking around the pool and repairing the neoprene piping. Because of the fact that several subcontractors in addition to Respondent worked in the pool area during construction of the pool project, it is impossible on the basis of this record to determine the cause of the damage to the neoprene piping. Respondent's testimony is uncontroverted that pressure testing performed prior to the conclusion of primary work on the pool in October of 1977 showed no leakage through the pool's piping system. Further, at the conclusion of the primary work in October, 1977, much of the pool's piping system was left exposed and could have been damaged either by the Developer's own workers or by employees of other subcontractors in the course of back- filling and tamping fill material preparatory to pouring concrete decking. The Developer's failure to advise Respondent of the schedule for back-filling, tamping and pouring of concrete deprived Respondent of an opportunity to properly pressure test the piping system at appropriate stages of construction. Respondent has submitted proposed findings of fact for consideration by the Hearing Officer. To the extent that those proposed findings of fact are not incorporated in this Recommended Order, they have been rejected as being either irrelevant to the subject matter of this proceeding or as not having been supported by the evidence.

Florida Laws (1) 120.57
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs RAYMOND HURLEY, 90-004233 (1990)
Division of Administrative Hearings, Florida Filed:Fort Pierce, Florida Jul. 06, 1990 Number: 90-004233 Latest Update: Jan. 31, 1991

The Issue The issue is whether the Respondent is subject to discipline for permitting his general contractor's license to be used by another person to construct a swimming pool, thereby conspiring with an unlicensed person to avoid statutory licensure requirements, and by failing to oversee the quality of the work performed by that person under Respondent's license.

Findings Of Fact The Petitioner is the state agency responsible to prosecute administrative complaints under Chapters 455 and 489, Florida Statutes, and the rules implementing those statutes. At all times material to the complaint, Raymond Hurley was licensed as a certified general contractor, holding Florida license CGC 000773 and served as the qualifying agent for Capital Resources and Development, Inc. Kenneth R. and Lucille M. Clopper, of Fort Pierce, Florida, entered into a contract with Fred Humberstone, doing business as Southern Fiberglass Pools of the Treasure Coast, Inc., on September 21, 1987, for the construction of a pool and screened enclosure at the Clopper's home. The contract price was $15,500. Mr. Humberstone has never been a qualified contractor in St. Lucie County, Florida. Mr. Hurley became authorized to do business as a contractor in St. Lucie County, Florida, on September 29, 1987, when he provided a copy of his state certified general contractor's license, a certificate of insurance for worker's compensation and general liability property damage insurance to St. Lucie County. St. Lucie County Permit No. 44574 was issued to Capital Resources and Development, Inc., on October 9, 1987. The permit application had been dated September 24, 1987. The application bore Mr. Hurley's contractor license number. In the space for the name of the company, the application had originally been written in the name of Southern Fiberglass Pools of the Treasure Coast, of Stuart, Florida. The name of the applicant had been scratched through, and the name of Capital Resources and Development, Inc., was written over it. The application bears a handwritten signature which reads Raymond S. Hurley, but it is not his signature. Mr. Hurley did not sign the application, or authorize anyone to sign it for him. Mr. Hurley knew Mr. Humberstone, the owner of Southern Fiberglass Pools of the Treasure Coast. Humberstone had difficulty with his corporation because his qualifying contractor had left, and Humberstone owned approximately $150,000 worth of equipment which he could not use without a qualifying contractor. Humberstone made a proposal to Hurley to become the qualifying contractor for Southern Fiberglass Pools of the Treasure Coast. It was about this time that Mr. Hurley first qualified to engage in the business of contracting in St. Lucie County. Mr. Humberstone must have pulled the permit for the Clopper jor, using Mr. Hurley's licensure in St. Lucie County. This is likely because at first, the line for the permit applicant had been filled in with the name of Humberstone's business, Southern Fiberglass Pools by the Treasure Coast. Mr. Hurley had become licensed in St. Lucie County because he was contemplating going into business with Mr. Humberstone. What cannot be determined from the evidence in the record is whether Mr. Hurley had agreed with Mr. Humberstone to make his licensure available to Mr. Humberstone so Humberstone could continue in the pool contracting business in St. Lucie County. Mr. Hurley did not sign the application for the permit at the Clopper's home. He never went to the Clopper's home to see the work or to meet the Cloppers. Had he gone into partnership with Humberstone he would likely have participated, to some extent, in the work. On this matter, the Department's proof is insufficient. After the construction at the Clopper home began, there were a number of delays in completion of the pool, and the contractor failed to install stress relief for the pool deck which resulted in cracking of the pool deck. The pool itself had three leaks. The problems with the pool remained unresolved and the Clopper's finally settled with Mr. Humberstone for payment for $1,020 in exchange for providing Mr. Humberstone with the release of liability. Ultimately, the Cloppers spend $1,659 to repair the problems created by Mr. Humberstone's inadequate work. Mr. Hurley was never at the job site, and the Cloppers never knew anything about him until after their pool had been completed; all of their dealings had been with Humberstone.

Recommendation It is recommended that the administrative complaint filed by the Construction Industry Licensing Board against Raymond Hurley be dismissed. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 31st day of January 1991. WILLIAM R. DORSEY, JR. Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of January 1991. APPENDIX TO RECOMMENDED ORDER DOAH CASE NO. 90-4233 Rulings on findings proposed by the Petitioner: 1-7. Accepted. 8. Rejected, as there is insufficient evidence to find that Mr. Hurley, although he knew Mr. Humberstone, had entered into any agreement Humberstone to become a qualifying contractor for Humberstone's corporation. While that is one inference which could be drawn from the evidence, the evidence is not strong enough to permit such finding, at the level of certainty required for clear and convincing evidence, to be made. Rulings on findings proposed by the Respondent: 1-6. Adopted 7. Rejected. There is insufficient evidence in the record to make specific finding with respect to handwriting exemplars, but the testimony of Mr. Hurley that he did not sign the St. Lucie County permit application has been accepted. Copies furnished: Robert B. Jurand, Esquire Department of Professional Regulation Northwood Centre 1940 North Monroe Street Suite 60 Tallahassee, Florida 32399-0792 Glenn N. Blake, Esquire BLAKE & TORRES Strange Building 500 South US 1 Fort Pierce, Florida 34950 Robert E. Stone, Esquire SULLIVAN, STONE, SULLIVAN LaJOIE and THACKER 100 Avenue "A", Suite 1F Fort Pierce, Florida 34950 Daniel O'Brien, Executive Director Department of Professional Regulation Construction Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Kenneth E. Easley, General Counsel Department of Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (2) 120.57489.129
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DARELL L. TREADWAY, 81-000329 (1981)
Division of Administrative Hearings, Florida Number: 81-000329 Latest Update: Aug. 27, 1981

Findings Of Fact The Respondent, Darell L. Treadway currently holds contractor's license number RP 0027269 and serves as qualifying agent for Treadway Pools and Concrete, 415 South Palmetto Avenue, Daytona Beach, Florida. (Petitioner's Exhibit II) On June 6, 1979, Chester Webb, 1548 Culverhouse Drive, Holly Hill, Florida, entered into a contract with Almo Pools of Florida, Inc., 609 Turnbull Bay Road, New Smyrna Beach, Florida, for Almo to construct a 13' x 27' kidney shaped fiberglass pool for $4,840.00. (Petitioner's Exhibit I) A $484.00 deposit was paid to Respondent Treadway on June 21, 1979, and on June 26, 1979, a building permit for the pool was obtained by Treadway Pools. (Petitioner's Exhibits I and II) Mr. Webb paid Respondent Treadway $4,684.00 toward completion of the pool. He refused to pay the $242.00 due on completion under the terms of the contract because of numerous problems with the pool including a broken drain, malfunctioning switch box timer, leaking pipes, defective filter and debris left at the site by workmen. (Testimony of Webb; Petitioner's Exhibit III) On August 23, 1979, Clyde Pirtle, Investigator, Department of Professional Regulation discussed the Webb pool with the Respondent who was informed by Pirtle that Almo Pools of Florida, Inc. was not licensed with the Board. (Petitioner's Exhibit III) Investigator Pirtle mailed change of status forms to the Respondent to qualify Almo Pool's but the forms were never completed and returned. (Petitioner's Exhibit III) At Investigator Pirtle's request, the Respondent agreed on August 23, 1979, to correct the problems with Mr. Webb's pool but thus far has failed to do so. In addition to repairing minor problems, Mr. Webb found it necessary to replace the pool filter. (Testimony of Webb) On August 29, 1979, the Respondent Treadway acting as agent for Almo Pools of Florida, Inc. entered into a contract with Donald Bird, 227 East Burn Drive, Orange City, Florida, to construct a 14' x 36' fiberglass pool with a 47' x 32' screen enclosure for $9,425.00. (Petitioner's Exhibit IV) The Respondent was paid $5,642.00 and on September 10, 1979, began installation of a fiberglass shell. (Testimony of Bird) While installing the pool, workmen who were attempting to level its bottom and sides cracked one side of the pool. (Testimony of Bird) The Respondent agreed to repair the crack and in October, 1979, returned to the site, repaired the crack and back-filled around the pool. (Id) No other work was done on the filter system or screen enclosure. Mr. Bird spent approximately $12,500.00 to finish the construction of his pool and patio. (Id) Mr. Bird's pool still has problems including discoloring, cracking and leaking. (Id) The Respondent Treadway failed to obtain a permit for the construction of the Bird's pool from the Volusia County Building Department and, accordingly, no permit for this project was ever obtained. (Testimony of Barrett) The Respondent failed to place his state registration number on the face of his contracts with Webb and Bird. (Petitioner's Exhibits I and IV)

Recommendation Upon consideration of the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Florida Construction Industry Licensing Board enter a final order revoking the registration of Darell L. Treadway as a state registered contractor. DONE and ORDERED this 21st day of July, 1981, in Tallahassee, Florida. SHARYN L. SMITH Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of July, 1981. COPIES FURNISHED: Drucilla Bell, Esquire Assistant General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Nancy Kelley Wittenberg, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Darell L. Treadway 415 South Palmetto Avenue Apartment Number 5 Daytona Beach, Florida 32015

Florida Laws (2) 489.119489.129
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. PASQUALE M. VESCERA, 83-000015 (1983)
Division of Administrative Hearings, Florida Number: 83-000015 Latest Update: Dec. 04, 1990

Findings Of Fact Based on the evidence presented, the following facts were found: At all times pertinent to this case, Respondent held two active contractor's licenses issued by the State of Florida, RP 0033354 and CP 015029. Respondent's current address is 1316 Hoffner Avenue, Orlando, Florida 32809. At all times pertinent to this case, Respondent owned the firm Family Pools and did business as a pool contractor under that name. At no time did Respondent ever qualify his firm, under whose name he did business, with the Florida Construction Industry Licensing Board (CILB). On some date not specified, in June, 1980, Alphonse J. and Pauline L. Rodier contracted with Family Pools to build a pool at their residence at 601 Michigan Avenue, Englewood, Sarasota County, Florida for a price of 6,700. The contract was signed by Respondent for Family Pools. The pool price was to include a screened enclosure and deck, and the entire package was to be completed by July 4, 1980. The pool was paid for by two checks from Coast Federal Sayings and Loan Association in Sarasota from the proceeds of a home improvement loan and by a final check in the amount of $900 from the Rodiers, direct, on October 13, 1980. Respondent subcontracted the pool enclosure to Climatrol Screen Company of Enqlewood, Florida, for $2,065 but failed to pay this subcontractor. As a result, on November 26, 1980, Climatrol filed a lien against Rodier's property which was released only when the Rodiers paid an additional $790 which had not been satisfied by the Respondent. Respondent had satisfied part of the debt to Climatrol by relinquishing title to a truck he owned. On July 3, 1980, Family Pools contracted with Elmer J. and Carla T. Taylor, of Bunnell, Florida, to build an above-ground pool on their property for $4,800.00. The pool was to have a one year warranty against defective parts and a 20-year prorated replacement policy. According to the contract, the pool price included the pump, liner, filter, and walls, along with all other parts. The pool was constructed by employees of Family Pools about three or four weeks after the contract was signed. Not long after the pool was completed and filled, Mr. Taylor noticed that the vinyl liner was protruding out beneath the bottom of the metal retaining wall. His calls to Family Pools were never answered by Respondent with whom he asked to talk and repair work on this problem was not accomplished by the Respondent or Family Pools. Mr. Taylor had to do the work himself and Family Pools would not honor the warranty. Respondent offers the completion certificate executed by the Taylors on August 21, 1980,as evidence the pool was installed properly and the Taylors were satisfied. Mr. Taylor indicates he signed that certificate in blank under pressure from Respondent's agent, who cajoled him into doing it on the basis that if he did not, Family Pools could not be paid by the finance company under the installment sales contract. Also, during the period of the one year warranty, the pool pump burned out. Mr. Taylor had to replace that and pay for it himself, as the warranty was not honored. Respondent contends only a 90-day warranty on the pump, but that appears nowhere in the contract, which, in its description of the pool covered by the one year warranty, includes the pump. On August 29, 1980, Family Pools contracted with Janice Conover to build a swimming pool at her home in Venice, Florida for $4,780. The pool was to be completed approximately 30 days after excavation at the site. Between August 29, 1980, and December, 1980, Ms. Conover paid Family Pools a total of $4,741 by checks which were endorsed by "P. Vescera d/b/a Family Pools" or "Pasquale M. Vescera." On October 2, 1980, Respondent pulled a permit No. 7330- N from the Sarasota County Building Department, in his own name, to construct Ms. Conover's pool. In February, 1981, when the pool was only about fifty percent complete, Respondent ceased work on Ms. Conover's pool without giving her any notice or reason therefor. When Respondent stopped work, he had only dug the hole for the pool. The liner had been delivered but was not installed. The braces were there but not affixed, notwithstanding Ms. Conover had paid almost in full for the pool. As a result, she contracted with Richard Thompson, Respondent's former employee, to finish the work Respondent had started because at this point she could not find the Respondent. Thompson installed the brackets, the liner, and the deck. She had to pay extra for the pump, the chemicals, and the sweep--all of which, except for the sweep, she had paid for when she paid Respondent's price. Respondent never returned to complete Ms. Conover's pool. On July 7, 1980, Family Pools contracted with Robert A. and Florence L. Peipher to build a pool at their property in Port Charlotte, Florida, for a price of $6,900. Between July 7 and November 28, 1980, the Peiphers paid Family Pools, by checks, the sum of $6,905. All checks-were endorsed for deposit, "P. Vescera d/b/a Family Pools." The pool price was to include a screened pool enclosure and in September 1980, Family Pools contracted with Climatrol to build the screened enclosure for Peipher's pool for $1,807. Respondent and Family Pools failed to pay Climatrol for the enclosure and as a result, Climatrol filed a lien against the Peipher's property for $1,807 which was satisfied on March 9, 1981, by the Peiphers who paid Climatrol the amount owed. On March 2, 1981, the Peiphers filed a complaint against Respondent with the Contractor License Division of the Charlotte County Building Department because of Respondent's failure to pay Climatrol and the resultant cost to them. As a result of this complaint and the subsequent investigation into the allegations, the matter was referred to the Charlotte County Building Board which, at its meeting on May 7, 1981, after notice to Respondent, voted to revoke Respondent's permit privileges in Charlotte County until he made restitution to the Peiphers and to notify the State of Respondent's actions requesting state action against his license. Respondent suffered severe financial setbacks just about the time of these incidents. He was hospitalized for a period of five or six weeks and upon his return to his business found that he had been "robbed" of approximately $50,000 worth of fully paid for inventory. When he reported the shortage to the local law enforcement officials, they told him that since there was no evidence of a breaking in, they could do nothing about it. In addition, he could not recover from his insurance company for the same reason. There was no evidence other than Respondent's sworn testimony that there was a shortage or that he reported the loss to either agency. Respondent has been in the pool business in Florida for five years and in New Jersey for 32 years before that. He feels the cause of his problem is the fact that he trusted the people who worked for him who took advantage of him. During the entire period of time he was in business in Florida he took no money from the company for his personal use, living instead on income from a mortgage he owned in New Jersey. He subsequently filed for bankruptcy on March 9, 1981. The $15,000 in current accounts receivable he had on the books at that time was utilized in the bankruptcy proceeding to pay creditors. He got-none of it. He is now working in Orlando, Florida, for a pool rehabilitation company owned by his wife and her father. Respondent alleges that on July 15, 1980, he paid Richard Thompson $1,100 to complete work started on several pools, including that of Ms. Conover. Review of the prior findings of fact, however, shows that the contract with Ms. Conover was not entered into until approximately 45 days after Respondent supposedly made this payment to cover the work left undone on her pool. In light of that development, I find his contention completely without merit or basis in fact. Respondent admits that people were hurt as a result of his actions and he regrets this. However, he claims these few incidents are insignificant when compared with the over 500 satisfied customers he alleges he has served over the years. Finally, Respondent contends that early in 1980, after being advised that he had passed the test to be a certified pool contractor, he wrote to Petitioner and, after advising how he was registered and doing business, asked if he needed to make any changes in license registration. He did in fact do this and received no reply. He thereafter assumed he was acting correctly in that regard and that appears to be a justified assumption.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That Respondent's license as a contractor be suspended for two years and that he be assessed an administrative fine of $500. RECOMMENDED this 16th day of May, 1983, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of May, 1983. COPIES FURNISHED: Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Pasquale M. Vescera 1316 Hoffner Avenue Orlando, Florida 32809 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Frederick Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (4) 120.57455.227489.119489.129
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. THEODORE A. DYSART, 82-000720 (1982)
Division of Administrative Hearings, Florida Number: 82-000720 Latest Update: Dec. 04, 1990

Findings Of Fact Respondent is a licensed general contractor and pool contractor. He is employed by Sally Dysart, Inc., and is currently the qualifying contractor for that company. Additionally, Respondent has served as qualifier for ARK Swimming Pool Service, Inc. On June 6, 1981, Sally Dysart, Inc., contracted with Theresa Pica to construct a swimming pool at her North Lauderdale residence. On June 9, 1981, Respondent obtained a permit from the City of North Lauderdale to construct the Pica pool. The permit indicated that ARK Swimming Pool Service, Inc., was the contractor. The contract specified that the pool would measure 16 x 32 x 3 x 6 1/2 feet, with stainless steel walls. The contract allowed "minor variations in dimensions . . ." and provided that, "Dysart is authorized to use its discretion in making changes or additions if the customer is not immediately available." The pool as installed was 8 feet rather than 6 1/2 feet deep, and the walls were of aluminum rather than stainless steel. These changes were not approved by Theresa Pica and she complained to Petitioner regarding these changes and other problems which are not relevant to the charges herein. This was an 18 inch change in pool depth and could not be considered a minor variation in dimensions, nor could the change in materials be considered insignificant. Respondent should have, but did not, obtain the owner's concurrence before substituting the 8 foot aluminum pool for the 6 1/2 foot steel pool, which the contract called for. This installation was also held to be in violation of Broward County Ordinance Section 9-14(b)(9), by the local board having jurisdiction. Respondent was not properly registered as the qualifying agent for Sally Dysart, Inc., at the time of this project. He was registered as the qualifier for Ark beginning in 1977, but his application to qualify Sally Dysart, Inc., was not received by Petitioner until November 1981 and not issued until December 1981. A Julius Kaplan was also a qualifier for Sally Dysart, Inc., but his application was not received by Petitioner until October 1981. Sally Dysart, Inc., was therefore not qualified by a licensed pool contractor at the time this company undertook the Pica project. The permit was improperly drawn on Ark Pool Service, Inc., by Respondent since Ark was not a party to the Pica contract. Respondent demonstrated that the administrator for Sally Dysart, Inc., was attempting to secure a qualifier for this company between April and December 1981. Thus, while some effort had been made to qualify Sally Dysart, Inc., this had not been accomplished at the time the Pica project was undertaken. Sally Dysart, Inc., contracted with James J. Mirrione to install a spa for him at his residence in Boca Raton. The permit was obtained by Respondent on behalf of Sally Dysart, Inc., on April 23, 1981. As noted above, Respondent was not a qualifier for Sally Dysart until December 1981. No final inspection of the Mirrione installation was ever made. Respondent believed that officer personnel at Sally Dysart, Inc., had arranged for such inspection, but it was either not requested or requested but not performed. On June 25, 1981, Warren Schober contracted with Sally Dysart, Inc., to construct a pool at his Miami residence. He negotiated the contract with a Milton Wolf who he understood to be the sales manager for Sally Dysart, Inc. The project was completed, but Schober encountered problems with a defective light and leaks in the pool. The difficulties were eventually corrected and Schober is now satisfied with the installation. In late August 1981, Milton Wolf agreed to sell Dr. Ronald Scott a swimming pool for $5,970. Scott made an initial payment of $3,970 to Milton Wolf by cashier's check dated September 8, 1981. Scott believed he was dealing with Sally Dysart, Inc., since Wolf held himself out as a representative of that company. Although he had some reservations about making the check payable to Milton Wolf personally, he had contacted a Better Business Bureau to determine that Sally Dysart, Inc., was a reputable company. Further, Wolf was available when he telephoned him at the Sally Dysart, Inc., offices. Sally Dysart, Inc., later disclaimed the Wolf agreement but offered to honor it if Scott would turn over the balance due. However, Scott rejected this offer and it was later withdrawn. He did not receive the pool or return of his initial payment. The evidence did not establish whether or not Sally Dysart, Inc., approved the contract for sale of the pool negotiated by Wolf. However, there was no construction contemplated and therefore no active involvement by Respondent in his capacity as construction supervisor. On July 31, 1981, Milton Wolf, on behalf of Sally Dysart, Inc., contracted with Mr. William D. Black for the sale and installation of a swimming pool at the latter's Miami resident. By check dated August 28, 1981, Black made an initial payment of $4,585 to Wolf. Black left the payee portion of the check blank at Wolf's request on the representation that he would use a stamp to supply the Dysart firm name. Wolf later filled in his own name, cashed the check and absconded. Black had no reason to distrust Wolf as he had communicated with Wolf at Sally Dysart, Inc., and had checked on the company through the Better Business Bureau. Wolf held himself out as sales manager and this was not repudiated by Sally Dysart, Inc., until after Wolf absconded. Respondent obtained a permit for the Black project on October 13, 1981, and some of the initial approvals were made. However, by letter dated September 22, 1981, Sally Dysart, Inc. (by its president, Sally Dysart), advised Black that the company would attempt to complete the project only if he would pay the balance of all payments due. This letter also disclaimed responsibility for Wolf's representations. In response, Black demanded that Sally Dysart, Inc., honor the contract and proposed that remaining payments be placed in escrow pending satisfactory completion. This proposal was rejected, and Black did not obtain the pool nor was his $4,585 "deposit" returned. Respondent sought to establish that Milton Wolf was not authorized to act on behalf of Sally Dysart, Inc., but that he was merely present in the Dysart offices as a potential business partner. His contact with customers was purportedly limited to investigation of leads and company business potential. However, the testimony of a former Dysart employee established that Wolf did make sales and brought in cash receipts to the company prior to his defalcation. Therefore, regardless of any private understanding between Sally Dysart, Inc., and Milton Wolf, the latter was holding himself out to the public as a company representative with the knowledge and approval of Sally Dysart, Inc.

Recommendation Based on the foregoing, it is RECOMMENDED that Petitioner enter a Final Order suspending Respondent's contractor licenses for a period of ninety (90) days. DONE AND ENTERED this 16th day of May, 1984, in Tallahassee, Florida. R. T. CARPENTER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of May 1984.

Florida Laws (2) 489.119489.129
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. STEVEN A. MELNIKOFF, 88-000567 (1988)
Division of Administrative Hearings, Florida Number: 88-000567 Latest Update: Jun. 29, 1988

Findings Of Fact Melnikoff is the holder of a certified pool contractor's license, having been issued license No. CP C032540. Melnikoff used this license to qualify Ken-Mel Enterprises and license no. CB C029067 was issued to Melnikoff qualifying Ken-Mel Enterprises. Ken-Mel entered into a contract with John and Edythe Milton to construct a residential pool at 7336 Pineville Drive, Jacksonville, Florida. Melnikoff applied for a building permit with the City of Jacksonville to construct the pool for the Miltons. His application included a set of plans and a site plan to be approved by the City of Jacksonville. The City of Jacksonville issued a building permit and provided an inspection sign-off card to be placed at the residence where the pool was to be constructed. Melnikoff and Ken-Mel constructed the pool and were paid in full. Melnikoff failed to request or obtain any inspections of the pool construction. This is a violation of the City of Jacksonville Building Code, Section 320.504. The pool is constructed in such a way that it is flawed, deficient and hazardous. Specifically, the water slide is hooked to a potable water system and to the hot water, which is both a serious code violation and a serious and hazardous condition. The water slide is positioned improperly and attached incorrectly, such that there is a danger of injury and this is a hazardous condition. The marcite is very rough and has started to peel away from the gunnite. The marcite is stained from the finish of the pool deck. The slurry from the gunnite and pool deck is buried near the pool and is improperly disposed of. Persons are mildly shocked when touching the railing in the pool, indicating that the pool is not properly bonded, which is a hazardous condition. The pool is not level or symmetrical and there are many imperfections in the continuous curve of the wall. Steel reinforcing bars are actually protruding through the concrete near the top of the pool. Building Code requires that there be a minimum coverage of 1 1/2" of concrete. The ceramic tile is falling off the wall and it is a very poor ceramic tile job. The expansion joints are improperly placed. The main drain cover has not been fastened down, which is a very dangerous situation and a code violation. There is no means or plan for discharging water from the pool, in violation of code. Part of the deck drain is under the slab of the Milton's house which is a serious problem. The pool is deeper than the plans indicated, in violation of the building code. The pool deck is very rough in places, does not drain away from the pool, and is cracked from improper compaction and improper placement of expansion materials. All of these defects and hazardous conditions establish that Melnikoff was grossly negligent and incompetent in the construction of this pool.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Professional Regulation, Construction Industry Licensing Board, enter a Final Order finding Steve A. Melnikoff guilty of the violations charged and revoking Melnikoff's license as a certified pool contractor. DONE and ORDERED this 29th day of June, 1988, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of June, 1988. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 88-0567 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the Petitioner in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Department of Professional Regulation, Construction Industry Licensing Board 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1(1); 2(2); 3-5(3); 6(4); 7(5); and 8 & 9 (6) COPIES FURNISHED: John O. Williams, Attorney at Law 1343 E. Tennessee St. Tallahassee, Florida 32308 Steven A. Melnikoff 710 Rosedale Drive Stephens City, VA 22655 Tom Gallagher, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Fred Seely, Executive Director Construction Industry Licensing Board Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (4) 120.57489.105489.119489.129
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. WILLIAM R. MACKINNON, 76-000026 (1976)
Division of Administrative Hearings, Florida Number: 76-000026 Latest Update: Sep. 28, 1976

The Issue Whether Respondent's License as a residential pool contractor should be suspended for alleged violation of Section 468.112(7), Florida Statutes. The Respondent did not appear at the hearing although proper notice thereof had been furnished under date of February 11, 1976 to him by the hearing officer. Accordingly, the hearing was conducted as an uncontested proceeding.

Findings Of Fact Respondent has been licensed as a registered pool contractor by the Florida Construction Industry Licensing Board since June 20, 1974. The license was not renewed for 1975/76 (Exhibit 4). Respondent filed a Voluntary Petition in Bankruptcy in the U.S. District Court for the Northern District of Florida, Bankruptcy No. TBK 75-25, on March 13, 1975 (Exhibit 5).

Recommendation That the registration of William R. MacKinnon as a residential pool contractor be suspended until such time as he meets the qualifications and other requirements for renewal of registration and applies therefor. DONE and ENTERED this 5th day of April, 1976, in Tallahassee, Florida. THOMAS C. OLDHAM Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of April, 1976. COPIES FURNISHED: David Linn, Esquire 217 South Adams Street Tallahassee, Florida 32301 Mr. William R. Mackinnon Route 3, Box 584C Tallahassee, Florida 32303

# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. BRADFORD CLOUGH, D/B/A AQUA-VAC SELF CLEAN, 79-001940 (1979)
Division of Administrative Hearings, Florida Number: 79-001940 Latest Update: Jun. 17, 1980

Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying and the entire record compiled, the following relevant facts are found. Bradford Clough, Respondent, is a registered pool contractor who holds license No. RP 0031551, which license is current and active. Respondent was first licensed on December 6, 1977, as qualifier of Aqua-Vac Self Clean Swim Pools. (Petitioner's Exhibit 1.) Arnold Verway has been the Building Director for Charlotte County since May 8, 1978. As Building Director, Mr. Verway is in charge of receiving and investigating complaints filed by homeowners against contractors licensed by the Charlotte County Building Board. In this regard, on October 5, 1978, the Charlotte County Building Board listened to two complaints which had been filed with the Department against Respondent "for not fulfilling his contract and for jobs done in an unworkmanlike manner . These complaints were filed by Mr. and Mrs. Phillip J. Greulich and Mr. and Mrs. George Beveridge, of Port Charlotte. After discussion, the Board sent formal notification to Respondent to attend the Board's next regular meeting in order to allow him an opportunity to present any defense respecting the above referenced complaints. Respondent was notified by certified letter dated October 13, 1978, return receipt requested. (Petitioner's Exhibit 2.) At the Board's meeting on November 2, 1978, complainants George Beveridge and Phillip Greulich restated their complaints which had earlier been made to the Board at its October 5, 1978, meeting. Respondent had not resolved the complaints to the satisfaction of complainants as of the date of this hearing. Respondent did not appear at the Board's November 2, 1978, meeting. The Board suspended Respondent's certificate of competency "until such time as he demonstrated to the Board that he had rehabilitated himself and was thus eligible and capable of working in Charlotte County". (Petitioner's Composite Exhibit 3.) The Petitioner has reviewed the disciplinary action taken by the Charlotte County Building Board. (Testimony of Petitioner's investigator, John Viking.) RESPONDENT'S DEFENSE As stated, Respondent did not appear at this hearing or at the hearing before the Charlotte County Building Board, despite proper notice.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Respondent's registered pool contractor's license, RP 0031551, be REVOKED RECOMMENDED this 30th day of April, 1980, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675

Florida Laws (1) 120.57