PHILLIP LOTT vs CITY OF DELTONA AND ST. JOHNS WATER MANAGEMENT DISTRICT, 05-003662 (2005)
Division of Administrative Hearings, Florida Filed:Deltona, Florida Oct. 06, 2005 Number: 05-003662 Latest Update: Jun. 26, 2006

The Issue This case involves a challenge to St. Johns River Water Management District’s (District or SJRWMD) intended issuance of an Environmental Resource Permit (ERP) granting the City's Application No. 4-127-97380-1, for the construction and operation of a surface water management system for a retrofit flood-relief project known as Drysdale Drive/Chapel Drive Drainage Improvements consisting of: excavation of the Drysdale Drive pond (Pond 1); improvement to the outfall at Sterling Lake; and the interconnection of Pond 1 and four existing drainage retention areas through a combination of pump stations and gravity outfalls (project or system). The issue is whether the applicant, the City of Deltona (City or Deltona), has provided reasonable assurance the system complies with the water quantity, environmental, and water quality criteria of the District’s ERP regulations set forth in Chapter 40C-4, Florida Administrative Code,1 and the Applicant’s Handbook: Management and Storage of Surface Waters (2005) (A.H.).2

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order issuing to the City of Deltona an ERP granting the City's Application No. 4-127-97380-1, subject to the conditions set forth in the Technical Staff Report. DONE AND ENTERED this 17th day of March, 2006, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of March, 2006.

Florida Laws (2) 120.57373.4136
# 1
CITY OF SARASOTA AND DEPARTMENT OF ENVIRONMENTAL REGULATION vs. ROGER HARLOFF, D/B/A OGLEBY CREEK FARM AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 89-000574 (1989)
Division of Administrative Hearings, Florida Number: 89-000574 Latest Update: Dec. 05, 1989

The Issue The issue for consideration at the hearing was whether the Respondent, Roger Harloff, should be issued a consumptive use permit to withdraw and use ground water from the wells on his property, and if so, in what amount and under what conditions.

Findings Of Fact Respondent, Roger Harloff, owns several farms in southeastern Manatee County, Florida which, taken together, make up an irregular 8,500 acre tract located approximately 2 1/2 miles north of the City of Sarasota's Verna Wellfield. Mr. Harloff grows vegetables on much of this tract, of which approximately 1,500 acres is devoted to tomatoes. This tomato crop is the prime crop produced by Mr. Harloff, and provides the raw material for the Harloff packing plant which is dependent upon the tomato crop in order to stay in business. Mr. Harloff also operates a plant nursery at which he produces many if not most of the seedling plants utilized in his vegetable growing operations. In order to be economically feasible and remain operative, Mr. Harloff must farm approximately 3,800 acres during the Spring growing season and approximately 3,000 acres during the Fall. These acres are made up of tomatoes and other vegetables. The packing plant and the plant nursery are dependent upon the farm operation and without adequate water, the farm operation cannot be successfully carried on. In September 1988, Mr. Harloff applied to the District for a consumptive use permit to withdraw water from twelve wells located on his property, requesting an annual average rate of 12,995,606 gpd, and a maximum daily rate of 47,520,000 gpd. The consumptive use permit application filed by Mr. Harloff was assigned District Number 204467.04. After evaluation of the application in conjunction with its needs and policies, the District issued a staff report and proposed agency action on the application which recommended issuance of the permit authorizing water to be drawn from the 12 wells at a rate approximating that requested in the application. Thereafter, the City of Sarasota, which operates the nearby Verna Wellfield, considering that the proposed withdrawal would have a substantial adverse impact on its wellfield operations, filed a Petition for Formal Administrative Hearing objecting to the issuance of the permit to Mr. Harloff. Though Mr. Harloff has owned much of the property which make up the 8,500 acre tract in question here, at the time of his application, he did not own, but had under contract, a substantial portion. He closed on the purchase of that remainder after he received notice of the District's intention to issue the permit in question but prior to the City's filing its Petition For Formal Hearing. The purchase price of the property in question was $9,000,000.00 which carries an interest payment on the financed portion of $52,000.00 per month. The wells pertinent to the issues in this proceeding are as follows: # Cons. Depth Cas. Lin. Diam. Cap. Loc. 1 1978 1185' 200' 220-490' 12" 2000 gpm SE 2. 1988 1320' 210' 210-480' 16" 3000 gpm SE 9. 1974 1130' 390' 16" 3000 gpm C 10. 1976 1232' 231' 283-400' 16" 3000 gpm NW 11. 1979 1120' 210' 260-480' 12" 2000 gpm NW 12. 1976 1180' 480' 12" 2000 gpm SW 3. 1989 1434' 460' 16" 3000 gpm SE 5. 1989 1374' 610' 16" 3000 gpm W 8. 1989 1292' 548' 16" 3000 gpm NW 13. 1989 1310' 635' 16" 2000 gpm NE Well No. 8 was used as the pump test well for the constant rate discharge test and Well No. 13 was the deep observation well for that test. Wells 1, 2, 9, 10, 11, and 12 have all been previously permitted by the District and No's 1, 2, 9 and 10 are currently permitted under two other permits, while 11 and 12 were permitted under a different permit. Wells No. 3, 5, 8 and 13 have been authorized for construction but not, as yet, to produce water. Wells 4, 6 and 7 have not yet been constructed. The intention is to drill them to a depth of 1,300 feet and case them to 600 feet. Each will have a pump capacity of 3,000 gpm. Number 4 will be in the southeast portion of the tract, number 6 in the central portion, and number 7 will be located just north of number 6. Wells 1, 2, 9, and 10 currently have a combined permitted maximum daily rate of 13,680,000 gallons under permits number 204467.03 for 1 and 2, and 204630 for 9 and 10. The former was issued on December 29, 1987 and will expire on December 29, 1993, and the latter, issued on October 7, 1981, will expire on that same day in 1991. The permit previously issued for wells 11 and 12 authorized withdrawal at a maximum daily rate of 2,160,000 gallons. That permit, number 204374, expired on September 9, 1986 and was not renewed. After the City filed its Petition challenging Mr. Harloff's proposed permit, Mr. Harloff, on June 26, 1989, filed an amended application to withdraw water at an average annual rate of 10.99 mgd and a maximum daily rate of 48.96 million gallons. This amended application refers to an additional proposed well, Number 13. The District, however, had previously approved wells 3 - 8 and 13, and pursuant to this authorization, wells 3, 5, 8, and 13 were built. Mr. Harloff submitted additional amendments to his application on August 7 and 9, 1989. The former requests a seasonal average daily rate of 25.34 mgd and a seasonal maximum daily rate of 32.79 mgd. The latter requests a seasonal average rate of 26.18 mgd, an annual average rate of 15.18 mgd, and a seasonal maximum rate of 31.56 mgd. In that regard, a seasonal rate is the same as an annual rate, (average or maximum) when applied to a growing season as opposed to a year. The additional amendments to the application were evaluated by District staff who, on August 18, 1989, issued a revised staff report and a proposal to issue to Mr. Harloff a consumptive use permit authorizing an average annual withdrawal of 11.1. mgd, an average seasonal withdrawal of 15.6 mgd, and a seasonal maximum withdrawal of 20.1 mgd. The proposed permit also contains terms and conditions which, the District contends, will, inter alia, permit Mr. Harloff to withdraw more water than he is currently authorized without additional adverse impact on the City's Verna Wellfield. It is to some of these terms and conditions that Mr. Harloff objects. Since the issuance of the revised staff report and intent to issue, the parties have negotiated on the various terms and conditions in question and have agreed to some and the amendment of others. Mr. Harloff has no objection to conditions number 1, 2, 3, 7 - 14, 23, 24, 26, 28 - 30, 32, and 34 & 35. The parties agree that other conditions, as indicated herein, should be amended as follows: Condition 19, on the third line, should be changed to read, " up to 20 inches tapering to 12 inches." Condition 22, on the second line, should be changed from "30 days" to "10 days". Condition 25, on the first line, should be changed from "within 60 days" to within 120 days". Condition 31, on the third line, starting with "following month" should be changed to "following months: January, April, July and October". Also, under Sampling Frequency, "Monthly" should be changed to "Quarterly". Condition 33, on the ninth line, insert the work "economically" before the word "feasible" in the phrase "specific operation and irrigation improvements are feasible". Mr. Harloff objects to conditions 4, 5, 15 - 17, 20 & 27. He does not object to the proposed new standards for new wells. Taken together, the parties then disagree only on the requirement for abandonment or refurbishment of existing wells and the quantities of water Mr. Harloff will be allowed to draw. The City supports the District's position on both issues. The City of Sarasota owns and operates a public water system to serve between 50 to 75 thousand people located in Sarasota County. The primary source of water for this system is the Verna Well field which is also owned by the City and which accounts for approximately 60 percent of the City's water needs. The City also operates a reverse osmosis, (R.O.) water desalinization facility, and has back-up wells at St. Armond Key and at the Bobby Jones Wellfield. The Verna Wellfield is located about 17 miles east of the Sarasota city limits on approximately 2,000 acres of land in northeastern Sarasota County. It consists of two tracts of land: Part "A", which is approximately 1/2 mile wide by 4 miles long; and Part "B", which is approximately 1 mile square located about 500 feet southeast of Part "A". The Verna Wellfield's permitted allocation is based on whether the R.O. facility is producing at capacity. If it is, the Verna daily allocation is 7 mgd, and if not, 9.5 mgd. The R.O. facility's capacity is 4.5 mgd and the backup wells have a capacity of 1.7 mgd. The wellfield contains 39 permitted production wells, 30 of which are in Part "A" and 9 of which are in Part "B." One of them, well 30, is currently inactive. The wellfield has been in operation as a part of the City's public water system since September 1966. When the Verna Wellfield was constructed in 1965-1966, its original design specified casing on most wells down to 140 feet with pump bowl settings at 125 feet. Each pump was to have a total dynamic head, (TDH) of 200 feet. Over the years, the City has decreased the TDH of the pumps at Verna from 200 feet to 175 feet. This has resulted in a reduction of the pumps' ability to produce water with sufficient pressure to carry it to the discharge point. This decline has been caused by an increase in withdrawal of water regionally, and not solely because of withdrawals from the Verna Well field. Verna is impacted by the use of water outside the boundaries of the wellfield. The City has an ongoing program calling for the refurbishment of 2 to 3 wells per year at the Verna Wellfield. It is the City's intent to convert the pumps to 200 feet TDH on all well refurbishments in the future. In August 1977, a program requiring permits for the consumptive use of water was implemented in both Sarasota and Manatee Counties. At that time, the Verna Wellfield had a production rate of 6.9 mgd annual average daily rate. On January 6, 1978, the City applied for a permit for Verna and on April 3, 1979, the District issued permit number 27804318 to allow the City to draw water from the Verna Wellfield. The City applied for a renewal of that permit in October 1983 and thereafter, in January 1985, the District authorized the continued withdrawal of water from Verna by the issuance of permit 204318 which, at Condition 18, placed limitations on the City's use of water from the wellfield. Specifically, the permit limited withdrawals from Verna to: ...6,000,000 gallons per day average and 7,000,000 gallons per day maximum, except during those times when ... [the R.O. process is reduced or to facilitate maintenance or repairs]. At such times, ... [withdrawals) may be increased to provide additional supplies not to exceed 8,000,000 gallons per day average annual and 9,500,000 gallons per day maximum. This condition clearly provides for additional supplies to be drawn to increase the Verna Well field production to a total of 8,000,000 and 9,500,000 mgd, respectively, not in addition to the regular permitted amount, by those quantities. The City's permit has been neither suspended nor revoked nor is any violation enforcement action currently under way. The current permit expires January 9, 1991. The water pumped from the Verna wells is held in a 1,000,000 gallon reservoir at the wellfield. This reservoir, which is topped at approximately 22 to 23 feet, electronically controls the pumping activity at the well field by turning on and shutting off pumps, in series, as the water level in the reservoir rises and falls. The water, when needed, is transmitted to another reservoir near the City's treatment plant in downtown Sarasota by gravity flow through a 30" diameter, 92,000 foot long pipe. The flow rate is approximately 5,000 gpm normally. When the treatment plant needs more water, a pump at the well field forces the flow at a rate of between 7,200 to 8,200 gpm, depending upon the level of water in the receiving reservoir. A flow of 8,200 gpm would draw 11.8 mgd from the wellfield. The operating capacity of the Verna Wellfield, in August 1988, was 17.9 mgd. Harloff's experts assert, and there is no concrete evidence to rebut it, that if all wells at Verna were pumping during a 24 hour period in May 1989, the reservoir could have been maintained at full level. However, though there is a manual override of the automatic reservoir/pump control system, it is unrealistic and unwise to expect full production on a 24 hour basis for any lengthy time period. Water under both Mr. Harloff's property and the Verna Well field is found at various levels known by different names. These include, in order of descent, the Surficial Aquifer, the Intermediate Aquifer, the Upper Floridan Aquifer, and the Lower Floridan Aquifer. The Surficial Aquifer extends from the surface down to between 20 and 60 feet below the surface. A 20 foot thick bed of clay separates the water in this aquifer from that in the aquifer immediately below it, the Intermediate Aquifer, which extends from approximately 80 feet down to approximately 420 feet below the surface. In the lower part of the Intermediate Aquifer, permeability decreases until a confining unit separating the bottom of the Intermediate Aquifer from the top of the Upper Floridan Aquifer is formed. There is such a confining unit between 420 and 500 feet. There is no well-defined confining unit between the Upper and Lower Floridan Aquifers. There is, however, a substantial difference in the transmissivity in each zone. "Transmissivity" is defined as the amount of water that will exist through a section of the aquifer that is the same width from the top to the bottom. The lower the transmissivity rate, the deeper the cone and the narrower the radius of effect. The higher the rate, the shallower the cone and the broader the radius. The Lower Floridan Aquifer has an extremely high transmissivity. Its top is found at a range of from 1,050 to 1,200 feet below the surface on Mr. Harloff's property. The water from the Upper Floridan Aquifer is of higher quality than that in the Lower. It is more readily usable for drinking than that in the Lower, but the Lower water is quite acceptable for agricultural purposes. What confining layer exists between the Upper and Lower Floridan Aquifers is made up of relatively impermeable anhydrides and gypsum. Because of this, there is little likelihood of the highly mineralized water from the Lower Floridan Aquifer rising into the better quality water in the Upper. If, therefore, water for agricultural purposes is drawn from the Lower Floridan Aquifer, with its high transmissivity and narrower cone radius, and if the wells utilized to procure this water are cased down to within the Lower aquifer, there is little chance of a negative impact on the better quality water, used for drinking by the City, within the Upper Floridan and Intermediate Aquifers. Mr. Hardin, an expert geologist and hydrogeologist testifying for Mr. Harloff, concluded, utilizing certain commonly accepted computer models, that Mr. Harloff's requested additional withdrawals would not have a significant effect on the Verna Wellfield's ability to produce water sufficient for the City's needs. This conclusion was based on 1989 seasonal use figures including an average rate of 21.95 mgd, a maximum rate of 27.04 mgd, and a maximum rate of 29 mgd under a "run time" calculation and the fact that during that period, the City was able to pump at least its permitted quantity from its wells at Verna. The City and the District do not accept this conclusion as reasonable, however, because, they claim, the withdrawal figures cited are not meter readouts but estimates based on the number of acres farmed and the number of pump operating hours during the period in question. The City's experts contend the data used by Hardin and Prochaska in their opinions is not that which other experts in the field would reasonably rely upon. They do not appear to be unrealistic, however, and, therefore, Mr. Hardin's opinion is accepted as but one factor to be considered. On the other hand, Mr. Anderson, also a Harloff expert hydrogeologist, claims the requested withdrawals would result in only an additional 1.7 foot drawdown in the Upper Floridan Aquifer underlying the Northeast corner of the Verna Well field. To be sure, this is only one small portion of the wellfield in issue. There has, however, been a continuing history of declining groundwater levels in this area over the past several years. After the 1975 drought, the City started to experience declining water levels at Verna which, because of the reduction in ability to produce water, required a lowering of the pump elements in some wells, and also caused the City to develop an R.O. facility in an effort to reduce dependence on well water. This drop in capability occurred again during the 1985 drought and this time the City modified the pump motors to shut off prior to cavitation and initiated a schedule of operating times for wells, so that water is drawn from different and geographically separated areas in a sequence designed to allow periodic regeneration of an area's supply. Nevertheless, water supply remains a concern at Verna, and the problems previously experienced continue to occur during periods of drought. In May 1989, the Verna Wellfield was periodically "unable" to meet it's short term peak demands at times even though all operating wells were pumping. This means that at the times in question, more water was being drawn from the Verna reservoir than could be replaced by pumping activities. It does not mean that the reservoir ran dry and water could not be furnished to the treatment plant. However, this condition is serious and indicative of a more serious shortage in the future unless appropriate safeguards are instituted. Mr. Balleau, the City's expert in hydrology and hydrogeology, and the District's experts all believe the Verna Wellfield is in trouble. It is operating well beyond its design range and the imposition of additional demands on it would seriously and adversely affect its ability to produce water. This position is supported by the facts and found to be accurate. There appear to be several options open to the City to contend with the Verna problem potential. These include: drill deeper wells at Verna to tap the Lower Floridan Aquifer. (This will produce the lower quality water found there and require additional treatment facilities. construct a linear wellfield along the pipeline from Verna to the treatment facility. (This will require additional permitting to draw the water, high construction and operating costs, and still result in low quality water requiring treatment. redevelop the downtown wells currently supplying the R.O. facility. (This will require satisfaction of regulatory issues, adversely impact on the users of the upper aquifers, possibly result in poor water quality and in contamination from nearby landfills.) develop a new well field southeast of Verna. (This will experience regulatory issues and high construction costs, with an unknown water quality result.) buy water from Manatee County. (This is expensive, may result in transmission and compatibility problems, and would be only a short term solution. lower pump assemblies; replace existing pumps and modify the pump circuits. (These are all unreliable, short term solutions of minimal benefit.) Mr. Harloff and the City/District disagree on the appropriate amount of water needed for the successful growing of the crops produced by his operations. Both agree, however, that the heaviest demands for water come in the spring growing season including April and May. Tomatoes require the most water. Peppers require nearly as much. This is because the short root systems require a higher water table in the soil to supply needed moisture. In its analysis of Mr. Harloff's application, the District, referring to tables developed for the purpose of allocation and relating to Harloff's watering history during the period from August 15, 1988 to June 7, 1989, subtracted the fall season recorded application of 20.7 acre-inches from the total 10 month figure of 50.92 acre-inches and concluded he would need 30.22 acre-inches for peppers during the spring, 1989 season. Unless shown to be totally unreasonable, however, (not the case here), the applicant's water need figures should be accepted. Mr. Harloff's operation constitutes an important part of Manatee County's agricultural economy, and agriculture utilizes 68.9 percent of the land in the county. Agricultural products sold in Manatee County in 1987 were valued at $145,655,000.00, which ranked Manatee County third among all Florida counties in vegetable production. Agriculture is the fourth largest employer in Manatee County, employing an average of 4,692 people per month. Through his farm operation alone, Harloff employes as many as 1,050 people, with 200 employed on a full-time basis. Experts estimate that the loss of the Harloff operation would cause a reduction of between 16 and 18 million dollars in agricultural sales in the county with an additional loss in jobs and income to his suppliers. This estimate is not at all unreasonable. Florida produces approximately 95 percent of all tomatoes grown in this country for the fresh tomato market during the winter growing season. Tomatoes are the single largest vegetable crop grown in the state and accounted for 39.7 percent of the total value of vegetables produced in Florida during the 1987-1988 growing season. Mr. Harloff produced 4.8 percent of the total shipment of tomatoes from this state during that period. Water, primarily through irrigation, is an indispensable portion of the farming operation for this crop. Mr. Harloff currently irrigates the majority of his non-citrus crops by use of a "semi-closed ditch irrigation system", as opposed to a "drip system." The drip system is considerably more efficient than the semi-closed system having an efficiency rating, (amount of water actually used by the plants) of between 80 to 90 percent, as opposed to 40 to 60 percent for the other. While Mr. Harloff could reduce his water needs considerably and achieve substantial savings on pump fuel by conversion to a drip system for all or a part of his crops, such an undertaking would be quite costly. One of the conditions proposed by the District for the approval of Harloff's permit, as amended, is the refurbishment of several of the existing wells utilized by Mr. Harloff to make them more efficient and to promote the withdrawal of water from the Lower Floridan Aquifer, in which there appears to be adequate water and from which the Verna Well field does not draw. Currently, Mr. Harloff has seven wells which do not meet the standards of this proposed condition. They are not drilled to 1,300 feet below mean sea level and are not cased to 600 feet. To bring these wells into compliance, they would have to be drilled to the 1,300 foot level, or to a level which has a specific capacity of 400 gpm, and the casings in each would have to be extended to 600 feet. Extending the casings would be a complicated procedure and Harloff's experts in the area cannot guarantee the procedure would successfully achieve the desired end. Assuming the retrofit was successful, the cost of the entire process would be approximately $15,000.00 to $16,000.00 per well. In addition, the process would, perforce, require reducing the diameter of the well from 10 to 8 inches, thereby necessitating increasing the pump capacity to produce sufficient water. The cost of this is substantial with an appropriate new pump costing somewhere between $10,000.00 and $15,000.00 each. Consequently, the anticipated cost of bringing the existing wells up to condition standards would be between $25,000.00 to $31,000.00 per well, while the cost of constructing a new well is between $40,000.00 and $50,000.00 per well. Mr. Harloff feels it would be more prudent for him to replace the existing wells rather than to retrofit them. This may be correct. Harloff experts also claim that extending the casings on the existing wells down to 600 feet would not provide a significant benefit to the aquifer nor cause any significant reduction in drawdown impact at Verna. The District and City experts disagree and, taken on balance, caution and the interests of the public indicate that a conservative approach is more appropriate. While Mr. Harloff proposes to convert the areas served by wells 1, 9, 11, and 12 to the growing of citrus which requires much less water than tomatoes, this would not be sufficient mitigation to offset the need for some modification if large amounts of water will still be drawn. The entire area under the District's jurisdiction has been experiencing a water shortage due to a lack of rainfall. As a result, in June 1989, the District adopted a resolution identifying an area, including the area in question here, as a "water use caution area." This was done because the Floridan Aquifer has been subjected to large seasonable drawdowns of the potientiometric surface, the level to which water in a confined aquifer can rise in a well which penetrates that acquifer. This drawdown is directly related to increased water use in the area, much of which is for agricultural purposes. As a result of the District's action, special conditions on well construction for consumptive use applicants have been imposed on a permit by permit basis to insure, as much as possible, that the applicant uses the lowest quality water appropriate for his intended purpose. These conditions are not unreasonable. While accepting the District's and City's conclusion that his wells, if permitted, would have some impact on the Verna Wellfield, Mr. Harloff does not concede that the impact is significant. Specifically, the difference in impact resulting from an increase from his currently permitted use of 13.68 mgd seasonal maximum and his requested use of 31.56 mgd seasonal maximum for wells 1, 2, 9, and 10 would be a maximum increased drawdown of 1.1 feet at the Intermediate aquifer and 1.8 feet at the Upper Floridan Aquifer. Both figures relate to that portion of the wellfield found in the northeast corner of Part A. If the anticipated usage for crops predicted by Mr. Harloff's experts for the spring of 1989 is accurate, the drawdown would be 0.2 feet for the intermediate aquifer and 0.4 feet for the Upper Floridan Aquifer measured at the northeast corner of Part B of the Verna We1lfield. Harloff's experts contend that additional impacts for the spring of 1989 included, the increased usage will not have a significant effect on Verna's ability to produce its permitted daily maximum withdrawal of 9.5 mgd. While this is an educated speculation, it should be noted that during May 1989, the Verna field was able to produce up to 8.3 mgd without using all wells during any 24 hour period. This does not consider, however, the problems encountered by the City as indicated by the wellfield personnel, and the fact that some of the City wells are not pumping water.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that Roger Harloff be issued a consumptive use permit, No. 204467.04, as modified, to reflect authorization to draw 15.18 mgd annual average, not to exceed 31.56 mgd seasonal maximum, conditioned upon compliance with the conditions found in the conditions portion of the permit, as modified to conform to the quantities as stated herein, and to include those requirements as to acre-inch and crop-acre limitations, well usage and abandonment schedules, well modification standards, and record keeping, as are contained therein. RECOMMENDED this 5th day of December, 1989, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of December, 1989. APPENDIX TO RECOMMENDED ORDER IN CASE No. 89-0574 The following constitutes my specific rulings pursuant to s. 120.59(2), Florida Statutes, on all of the proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: City of Sarasota, joined by the District 1 & 2. Accepted and incorporated herein. 3. Accepted and incorporated herein. 8-12. Accepted and incorporated herein. 13. Accepted and incorporated herein. 14-22. Accepted and incorporated herein. 23-25. Accepted and incorporated herein. 26. Accepted and incorporated herein. 27 & 28. Accepted and incorporated herein. 29-33. Accepted and incorporated herein. Not a Finding of Fact but a statement of party position. & 36. Accepted. 37. & 38. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Not a Finding of Fact but a comment on opponent's satisfaction of its burden of proof. 42-44. Accepted and incorporated herein. Accepted and incorporated herein. Rejected as a misstatement of fact. Water service was never interrupted. The deficiency was in the City's inability to keep its wellfield reservoir filled. 47-54. Accepted and incorporated herein. Accepted and incorporated herein. Rejected for the reasons outlined in 41. 57-62. Accepted and incorporated herein. 63. Rejected for the reasons outlined in 41. 64-66. Accepted and incorporated herein. Rejected for the reasons outlined in 41. Rejected. & 70. Accepted and incorporated herein. 71. & 72. Accepted and incorporated herein. 73. Accepted and incorporated herein. 74 & 75. Accepted and incorporated herein. Accepted. Not a Finding of Fact but a statement of party position. Rejected. Accepted. Irrelevant. 81-84. Rejected. 85. & 86. Accepted and incorporated herein. 87 & 88. Accepted and incorporated herein. 89. Accepted and incorporated herein. 90 & 91. Accepted and incorporated herein. 92. & 93. Accepted and incorporated herein. FOR THE RESPONDENT: Roger Harloff 1-9. Accepted and incorporated herein. 10-13. Accepted and incorporated herein. 14 & 15. Accepted and incorporated herein. 16-25. Accepted and incorporated herein. 26-28. Accepted and incorporated herein. 29 & 30. Accepted. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Not proven. 35 & 36. Accepted and incorporated herein. 37 & 38. Accepted and incorporated herein. 39-41. Accepted and incorporated herein. 42 & 43. Accepted and incorporated herein. 44. Accepted. 45 & 46. Accepted and incorporated herein. 47 & 48. Accepted and incorporated herein. 49. Accepted. 50 & 51. Accepted and incorporated herein. Accepted. Accepted. Accepted. & 56. Accepted and incorporated herein. 57. Accepted. 58-60. Accepted and incorporated herein. 61 & 62. Accepted and incorporated herein. Rejected as unproven. Accepted. Accepted and incorporated herein. Accepted. 67-68. Accepted. Not a Finding of Fact but an interpretation of party po Accepted. Rejected. 72 & 73. Accepted. COPIES FURNISHED: Edward P. de la Parte, Jr., Esquire de la Parte, Gilbert and Gramovot, P.A. 705 East Kennedy- Blvd. Tampa, Florida 33602 Edward B. Helvenston, Esquire SWFWMD 2379 Broad Street Brooksville, Florida 34609-6899 Douglas P. Manson, Esquire Blain & Cone, P.A. 202 Madison Street Tampa, Florida 33602 Peter G. Hubbell Executive Director SWFWMD 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (7) 120.5715.1827.0428.1630.22373.019373.223
# 2
CARLOS M. BERUFF vs SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 99-004158 (1999)
Division of Administrative Hearings, Florida Filed:Bradenton, Florida Oct. 04, 1999 Number: 99-004158 Latest Update: Mar. 15, 2002

The Issue The issue is whether Petitioner is entitled to an environmental resource permit for a surface water management system and the alteration of a wetland in connection with the construction of two warehouses, paved parking and loading areas, a detention pond, and enhancement of the remainder of the existing wetland. If not otherwise entitled to the permit, an additional issue is whether Petitioner is entitled to the permit through an exemption, waiver, or variance from the standard requirements for mitigation.

Findings Of Fact Background Petitioner Carlos M. Beruff, as Trustee under Florida Land Trust No. 22 dated March 30, 1989 (Petitioner), purchased 85 acres of land in Manatee County for $1.2 million in May 1989. (All acreages are approximate.) The east boundary of the 85-acre parcel consists of about 1700 feet of frontage along U.S. Route 301. One month after the purchase, Petitioner sold 70 of the 85 acres for $1.6 million. In the intervening month, Petitioner incurred no significant expenses for development or marketing, although the development and marketing expertise of Carlos Beruff facilitated the $1.6 million sale. The 70 acres that were sold included the frontage on U.S. Route 301. The 15 acres remaining after the sale comprise two tracts of 9 and 5.88 acres. In these cases, Petitioner seeks an environmental resource permit (ERP) for activities involving the 5.88-acre parcel (Site). The 9-acre parcel occupies the northwest corner of the 85-acre parcel. The Site, which was platted in 1911, is the only noncontiguous land constituting the 85-acre parcel; it is 450 feet south of the remainder of the 85-acre parcel. The sole parcel between the Site and the remainder of the 85- acre parcel was originally owned by Lowe's and is now owned by Cheetah Technologies (Cheetah Parcel). The 5.88-acre Site is subject to a road right-of-way of 0.32 acres in favor of the Cheetah Parcel. Of the remaining 5.56 acres, 4.66 acres are wetland and 0.9 acres are upland. The 0.9 acres of upland are subject to an access easement of 0.42 acres, also in favor of the Cheetah Parcel, so the net available upland acreage is only 0.48 acres. The Cheetah Parcel occupies the northwest corner of U.S. Route 301 and Saunders Road (also known as 63rd Avenue East). The Site is immediately west and south of the Cheetah Parcel and occupies the northeast corner of Saunders Road and 24th Street East (also known as Arlin Road). The Site is about 530 feet west of the intersection of U.S. Route 301 and Saunders Road. U.S. Route 301 is a major arterial, and Saunders Road is at least a major collector road. The Site contains about 600 feet of frontage along Saunders Road and 465 feet of frontage along 24th Street East. The Site is in unincorporated Manatee County roughly midway between downtown Bradenton and downtown Sarasota. Saunders Road crosses a north-south railroad line approximately one-half mile west of the Site and Bowlees Creek about 650 feet west of the railroad track. The 9-acre parcel still owned by Petitioner is about 350 feet north-south by 1250 feet east-west. The western boundary of the 9-acre parcel runs along the east side of the railroad line. Like the other parcels involved in this case, the 9-acre parcel drains into Bowlees Creek. The Site is in an area characterized by industrial land uses, including warehouses, a junkyard, an industrial center, and a bakery. A halfway house for persons recently released from prison is located one-quarter mile to the west of the Site. The Site is zoned HM (heavy manufacturing), which is a limited, and thus valuable, zoning category in Manatee County. Respondent has issued three relatively recent surface water management permits that are relevant to these cases: a 1986 permit for the development of the Cheetah Parcel (Cheetah Permit), a 1988 permit for the widening of Saunders Road from two to four lanes (Saunders Road Permit), and a 1989 permit for the construction of a commercial park north of the Site known as 301 Park of Commerce (301 Permit). Bowlees Creek runs from north to south, emptying into Sarasota Bay across from Longboat Key. Sarasota Bay is an Outstanding Florida Water. Bowlees Creek drains a nine square-mile basin, which is about 21-25 percent developed. The Bowlees Creek basin is an open drainage basin. Due to flooding problems, Manatee County has imposed special limitations upon development within the Bowlees Creek basin. Among these limitations is that the rate of post- development runoff must be less than the rate of pre- development runoff--up to 50 percent less, according to expert witnesses for both sides (Lawrence Weber, Tr. Vol. III, pp. 118-19; and Daryl Flatt, Tr. Vol. IV, p. 230). By stipulation, the Site is at the extreme eastern end of the Bowlees Creek basin. In fact, the Site may have historically drained into Bowlees Creek and will drain into Bowlees Creek after, as described below, the northwest window is added to the surface water management system. In 1993 or 1994, Petitioner began the process of developing the Site following the sale five years earlier of the larger 70-acre parcel. Mr. Beruff has been in the development business for 20 years. His career began in 1980 when Mr. Beruff became an employee for U.S. Homes and Modern Builders; he became self-employed in 1984. Mr. Beruff has developed seven commercial and ten residential developments. Application Process Deciding to pursue warehouse development for the Site, Petitioner initiated the development process by hiring an engineer and environmental consultant. With the assistance of these consultants, Petitioner prepared its application for an ERP. By application dated October 9, 1998, and filed November 13, 1998, Petitioner requested that Respondent issue an individual ERP for the construction on the Site of a surface water management system in connection with the construction of two warehouse buildings, paved parking and loading areas, and a detention pond, as well as the enhancement of the remainder of the existing wetland (Application). The Application states that the total building, parking, and loading areas would be 58,026 square feet and that wetlands constitute 3.37 acres of the 5.88-acre Site. The site plan attached to the Application shows a "wetland preservation & enhancement" area of 1.592 acres at the north end of the Site. To the south, toward Saunders Road, are two buildings with paved parking and loading areas. On the southwest corner is a "stormwater treatment & attenuation" area. After several discussions with Respondent's staff, Petitioner modified the proposed development. In its latest revision, the footprint of the proposed development would occupy 2.834 acres of wetland, leaving 1.826 acres of wetland. On November 13, 1998, Petitioner filed a Petition for Exemption, Waiver or Variance as to Mitigation Requirements, seeking an exemption, waiver, or variance from all laws requiring offsite mitigation or additional onsite mitigation for the portion of the wetland that would be destroyed by the proposed development. Drainage At present, the Site receives runoff from a total of 27 acres. The offsite contributors of runoff are the Cheetah Parcel and a segment of Saunders Road east of 21st Street East. These locations have drained into the Site for hundreds of years. In general, drainage raises two distinct issues: water quality and water quantity. For an open drainage basin, the issue of water quantity expresses itself primarily in runoff discharge rate, although historic basin storage is also an issue. As discussed in the Conclusions of Law, the Respondent's Basis of Review identifies different storm events to which applicants must design different components of surface water management systems. For water quantity, the system may release no more than the permitted discharge rate in the design storm, which is the 25-year, 24-hour storm event. At present, the design storm would produce about eight inches of rain, although the same design storm, due to a different model or modeling assumptions, produced 9.5 inches of rain at the time of the issuance of the permit for the Cheetah Parcel. (The practical effect of this change in the calculation of the design storm is that the quantitative capacity of the surface water management system of the Cheetah Parcel is nearly 20 percent greater than would be required today.) For water quality, the system must capture the first inch of runoff (sometimes only the first half-inch of runoff, depending on the type of system and receiving waterbody). In contrast to the relatively infrequent 25-year storm, approximately 90 percent of the storms in Respondent's jurisdiction produce no more than one inch of runoff. The underlying premise is that the first inch of runoff contains nearly all of the contaminants that will be flushed from impervious surfaces. The Cheetah surface water management system features a wetland and a retention pond along the north property line of the Site. The Cheetah pond and wetland attenuate runoff before allowing it to drain south onto the Site. The Cheetah surface water management system also includes a swale running north along 24th Street East to take runoff eventually to Bowlees Creek. The Saunders Road surface water management system discharging onto the Site consists largely of an underground, offline storage and attenuation system that stores excess runoff, as compared to pre-development rates, in lateral pipes off a weir. Nothing in the record suggests that the surface water management systems authorized by the Cheetah Permit or the Saunders Road Permit fail to provide reasonable assurance that the discharged runoff is of satisfactory water quality. Following their respective permits in 1986 and 1988, respectively, the rates of discharge of runoff from the Cheetah Parcel and Saunders Road were no greater post- development than they had been pre-development. The Cheetah Parcel post-development and pre-development discharge rates were both 10.6 cubic feet per second (cfs). The Saunders Road post-development and pre-development discharge rates were both 32.4 cfs. In issuing the 301 Permit, Respondent authorized the construction of a drainage system that would take runoff north along 24th Street East and then west, eventually emptying into Bowlees Creek. Conforming to the previous drainage system, the new system replaced an open ditch with underground stormwater pipes. Of particular relevance to the Site, two prominent features of the system authorized by the 301 Permit were windows in the vicinity of the southwest and northwest corners of the Site (Southwest Window and Northwest Window). A window is an opening in the wall of a hardened structure whose purpose includes drainage. The opening is constructed at a certain elevation and a certain size to allow specified volumes or rates of water to pass into the structure and then offsite. The 301 Permit authorized the construction of a swale along the southwest corner of the Site to direct runoff discharging from the Saunders Road system into the Southwest Window. This swale has been construed. However, several problems have precluded the construction of the Southwest Window, probably permanently. The most serious problem, from an engineering perspective, is the failure to lay the stormwater pipe along 24th Street East at the proper depth. The stormwater pipe was erroneously installed at an elevation of 15.32 feet National Geodetic Vertical Datum (NGVD), and the Southwest Window was to have been cut at a control elevation of 14.75 feet NGVD. The discharge elevation of the Saunders Road outlet precludes raising the control elevation of the Southwest Window sufficiently to allow gravity drainage into the stormwater pipe. Exacerbating the discrepancy among the as-built elevations of the three structures is what appears to be a design problem belatedly recognized by Respondent. Respondent is justifiably concerned that the Southwest Window, at a control elevation of 14.75 feet NGVD, would draw down the water elevation of the Site's wetland, which is at a wet season elevation of 16.5 feet NGVD (now actually 17 feet NGVD, possibly due to the absence of the Southwest Window). A third problem with the Southwest Window is that the southwest corner of the Site was not historically a point of discharge, so the Southwest Window would deprive the Site's wetland of runoff. Fortunately, neither the Southwest nor the Northwest Window is essential for the proper operation of the surface water management system of 301 Park of Commerce, which largely depends on a series of lakes for treatment and attenuation. The Northwest Window was to be at elevation 16.5 feet NGVD, and its construction would provide needed drainage for the Site. In general, the Northwest Window does not raise the same concerns as does the Southwest Window. The Northwest Window is in the vicinity of the historic point of discharge for the Site and replaces a ditch permitted for the Cheetah Parcel to take runoff north along 24th Street East. The Northwest Window would also alleviate a standing-water problem at the northwest corner of the Site. However, Manatee County, which controls the right- of-way on which the Northwest Window is located and is responsible for its construction and maintenance, has discovered that it lacks a sufficient property interest to access the Northwest Window. The County has since initiated the process by which it can obtain the necessary interest, and, once completed, the County will cut the Northwest Window into the existing structure. Due to the role of the Northwest Window in draining the runoff in the area, including the Site, the Application reincorporates the Northwest Window, as it should have been constructed pursuant to the 301 Permit. Although the Cheetah and Saunders Road permits resulted in greater runoff volume entering the Site, more importantly to area drainage, these permits did not result in greater runoff rates and or in a deterioration in runoff water quality. Likewise, the failure to construct the Southwest Window and Northwest Window is not especially relevant to area drainage, nor is the likely inability ever to construct the Southwest Window. Far more important to area drainage is the fact that Petitioner proposes that the Site, post-development, would produce a runoff rate of 10.6 cfs, as compared to a pre-development runoff rate of 7 cfs. A serious adverse impact to area drainage, the proposed activity increases the runoff rate by 50 percent in a floodprone, 80-percent builtout basin--a basin of such sensitivity that Manatee County is imposing a post-development requirement of substantially reduced runoff rates. The cumulative impacts of the proposed development, together with existing developments, would be to cause substantial flooding of the Bowlees Creek basin. Petitioner's expert attempted to show that the runoff from the Site, which is at the extreme eastern end of the Bowlees Creek basin, would be delayed sufficiently so as not to exacerbate flooding. Respondent's expert thoroughly discredited this testimony due, among other things, to its reliance upon obsolete data and an unrealistic limitation upon the assumption of the direction of travel of storms. Similarly, Petitioner failed to prove that the authorized discharge rate for the 301 Permit is 42 cfs. This assertion is most succinctly, though not exclusively, rebutted by the fact that the 42-inch pipe can only accommodate 18 cfs. Even if the 42-inch pipe could accommodate a substantially greater runoff rate, Petitioner's expert would have erroneously inferred a permitted discharge rate from this increased capacity without negating the possibility that other structures in the 301 surface water management system effectively reduced the rate or that oversized structures existed to accommodate higher runoff rates in storms greater than the design storm. In addition to increasing the runoff rate by 50 percent, Petitioner's proposal would also reduce the historic basin storage by over 40 percent. Displaced basin storage moves downstream, increasing flood levels from fixed storm events. At present, the Site provides 8.68 acre-feet of historic basin storage. The Application proposes to replace this storage with storage in the wetland and retention pond totaling only 4.9 acre-feet. The loss of 3.8 acre-feet of basin storage means that this additional volume of water would, post-development, travel down Bowlees Creek. A final drainage deficiency in Petitioner's proposal arises out of a berm's proposed outside of the Northwest Window. A one-foot bust in the survey of Petitioner's expert would have resulted in this berm preventing runoff from entering the Site from the Cheetah Parcel, as runoff presently does. Respondent's expert suggested several possible alternatives that might result in a permittable project with respect to post-development runoff rates (the record is silent as to the effect of these alternatives upon historic basin storage, although it would seem that they would add storage). Reducing the area of destroyed wetlands to one acre would probably reduce the excess of post-development runoff rate to 1-2 cfs. Petitioner could then obtain offsetting attenuation through a variety of means, such as by obtaining an easement to use the wetland on the Cheetah Parcel, constructing an attenuation pond on the 9-acre parcel, or constructing underground vaults in the filled area of the wetland on the Site. Wetlands Except for the road right-of-way, the Site is undeveloped and forested. The presence of 25-year-old red maples militates against attributing the transition from an herbaceous to a forested wetland to the failure to install the Northwest and Southwest windows. More likely, this transition to the sub-climax species of red maple and willow (in the absence of a cypress source) is due to the repression of fire on the Site. Experts for the opposing sides differed sharply in their biological assessments of the wetland. Petitioner's expert described a stressed wetland whose impenetrable thicket provided habitat only to a lone rat and swarm of mosquitoes. Respondent's expert described a robust wetland featuring a luxuriant overstory of red maple and Carolina willow; an rich understory of ferns, and diverse wildlife ranging from birds in the air (direct evidence); fish, snails, and tadpoles in a small pond (direct evidence); and squirrel and opossum (indirect evidence) scampering (indirect evidence) among the buttonbush, elderberry, and wax myrtle (direct evidence). Undoubtedly, the wetland has been stressed; approximately 30 percent of the wetland vegetation is Brazilian pepper, which is a nuisance exotic. However, the wetland is well hydrated. Issuance of the Cheetah Permit was predicated, in part, upon the rehydration of the wetland on the Site. With the issuance of the Cheetah Permit and especially the Saunders Road Permit, the quality of water entering the wetland has improved by a considerable amount. As already noted, added volumes of runoff are entering the wetland since the issuance of these two permits, although post-development runoff rates are the same as pre-development runoff rates. On balance, the wetland is functioning well in providing habitat and natural drainage functions. Giving due weight to the current condition of the wetland, the enhancement offered by Petitioner does not approach offsetting the loss of wetland area. In return for destroying 2.83 acres of the wetland, Petitioner proposed the enhancement of the remaining 1.83 acres by removing exotic species to no more than 10 percent of the total vegetation. The mitigation is plainly insufficient because of the level of functioning of the entire wetland at present. Additionally, Petitioner has failed to demonstrate that the Brazilian pepper, which is the major nuisance exotic occupying the Site, is evenly distributed; to the contrary, it is present mostly outside the wetland, along a berm just outside of the wetland. The lack of seedlings and old specimens suggests that the Brazilian pepper population may not be stable and may itself be stressed. Petitioner's failure to show that the remaining wetland area has more than 10 percent infestation or is likely to suffer additional infestation further undermines the effectiveness of the proposed mitigation. Respondent has never issued an ERP for a proposed activity involving the alteration of wetlands when the enhancement mitigation ratio is as low as .65:1, as Petitioner proposes. In general, Respondent requires higher mitigation ratios when proposals involve wetlands enhancement, rather than wetlands creation, because the wetlands to be enhanced are already functioning--in these cases, at a relatively high level. Although Petitioner has been unwilling to consider such alternatives, numerous alternatives exist for offsite mitigation or mitigation banking, if insufficient area exists for adequate onsite mitigation. Lastly, Petitioner devoted considerable effort at hearing to portraying Respondent's handling of the Application as flawed and unfair. However, the evidence does not support these assertions. Most strikingly, Respondent's staff treated the drainage windows inconsistently, to the benefit of Petitioner. They treated the Northwest Window as installed for the purpose of calculating the pre-development runoff discharge rate to Bowlees Creek. Until the Northwest Window is installed, the actual rate is even lower. This approach is justifiable because the Northwest Window will be installed at some point. On the other hand, Respondent's staff ignored the higher wetland elevation on the Site, presumably resulting from the absence of the Southwest Window. However, this approach, which benefits Petitioner in calculating wetland drawdown effects, is unjustifiable because the Southwest Window probably will never be installed. Petitioner's specific complaints of unfair treatment are unfounded. For example, Petitioner suggested that Respondent credited Lowe's with wetland acreage for the littoral shelf of its wetland, but did not do so with the wetland on the Site. However, Petitioner produced no evidence of similar slopes between the two shelves, without which comparability of biological function is impossible. Additionally, Petitioner ignored the possibility that, in the intervening 14 years, Respondent may have refined its approach to wetland mitigation. Although occurring at hearing, rather than in the application-review process, Respondent's willingness to enter into the stipulation that the Site presently drains into Bowlees Creek, despite recent data stating otherwise, was eminently fair to Petitioner. Absent this stipulation, Respondent would have been left with the formidable prospect of providing reasonable assurance concerning drainage into the floodprone Bowlees Creek when the post-development rate was 10.6 cfs and the pre-development rate was 0 cfs.

Recommendation Based on the foregoing, it is RECOMMENDED that Respondent deny Petitioner's application for an environmental resource permit and for an exemption, variance, or waiver. DONE AND ENTERED this 29th day of February, 2000, in Tallahassee, Leon County, Florida. ___________________________________ ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of February, 2000. COPIES FURNISHED: S. W. Moore Tracey B. Starrett Brigham. Moore, Gaylord, Schuster, Merlin & Tobin, LLP 100 Wallace Avenue, Suite 310 Sarasota, Florida 34237-6043 Mark F. Lapp Jack R. Pepper Assistant General Counsel Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609 E. D. "Sonny" Vergara Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (17) 120.54120.542120.569120.57267.061373.042373.086373.403373.406373.413373.414373.416373.421380.06403.031403.061403.201 Florida Administrative Code (6) 40D-4.09140D-4.30140D-4.30240D-40.30162-302.30062-4.242
# 3
FLORIDA WILDLIFE FEDERATION vs. GORDON V. LEGGETT, MOSELEY COLLINS, ET AL., 82-002235 (1982)
Division of Administrative Hearings, Florida Number: 82-002235 Latest Update: Jun. 21, 1991

The Issue Whether the applicants own the property in question? Whether the project would comply with the criteria of the South Florida Water Management District contained in Basis of Review for Surface Water Management Systems, specifically Sections 3.1.3 and 3.2? Whether flood protection would be inadequate or septic tanks unsuitable or whether the public health and safety would be compromised or the ultimate purchasers be deprived of usage of the property due to inundation in violation of Chapter 373, Florida Statutes (1981), or Rule 40E-4.301(1), Florida Administrative Code?

Findings Of Fact Ms. Williamson and Messrs. Leggett and Collins hold in fee simple a triangular 117.24-acre parcel in Okeechobee County as tenants in common under a warranty deed executed in their favor by one W. C. Sherman. They propose to develop the property as a trailer park (complete with airstrip) large enough to accommodate 109 trailers. To this end, soil would be dug up from the center of the property and used to raise the elevation of the surrounding land above the 100-year floodplain. (T. 47) The applicants have a dredging permit from the Department of Environmental Regulation authorizing them to excavate 629,889 cubic yards. They are proposing to dig to a depth of 76 feet below ground. This would create an 18-acre body of water ("Poe's Lake") which would overflow a V-notched weir into a county canal. The county canal would take the water to C- 38, one of the large canals to which the Kissimmee River has been relegated, at a point about 18 miles upstream from Lake Okeechobee. Runoff would wash over residential lots and roadways; the site would be graded to assure drainage into Poe's Lake. The minimum road crest elevation would be 30 feet NGVD ("[a]round twenty-nine feet" T.52), as compared to the control elevation for surface waters of 28.5 feet NGVD. WATER QUALITY The developers plan septic tanks for wastewater treatment. At the close of all the evidence, counsel for the applicants stated that sanitary sewers could be installed instead. Respondents' Proposed Recommended Order, p. With all the housing units in use, at least 10,900 gallons of effluent would seep into the ground from the tanks daily. There would be some evapotranspiration, but all the chemicals dissolved in the effluent would eventually end up in the groundwater. During the dry season, septic tank effluent would cause mounding of the groundwater and some groundwater movement toward, and eventual seepage into, Poe's Lake. The eventual result would be eutrophication and the growth of algae or macrophytes on the surface of Poe's Lake. This would cause dissolved oxygen violations in Poe's Lake. Discharges from the lake would inevitably occur, aggravating the situation in C-38, which already experiences dissolved oxygen levels below 5.0 milligrams per liter in the rainy summer months. Some fraction of the nutrients in the effluent from the septic tanks would ultimately reach Lake Okeechobee itself. The sheer depth of the excavation would create another water quality problem. Under the anaerobic conditions that would obtain at the bottom of Poe's Lake, bacteria acting on naturally occurring sulfates would produce hydrogen sulfide, ammonia and various other reduced organic nitrogen compounds. These substances are toxic to human beings and would, in some indeterminate quantity, enter the groundwater from Poe's Lake. This would affect the taste and perhaps the potability of water from any well nearby. It would be "possible to design a better system where there would be nutrient removal and a greatly reduced probability of violation of the dissolved oxygen criterion and obviation of the potential for ground water contamination." (T. 200) Installation of a baffle on the weir would serve to prevent buoyant debris from entering surface waters of the state. BASIS OF REVIEW Official recognition was taken of the "Basis of Review for Surface Water Management Permit Applications Within the South Florid Water Management District," parts of which all parties agree pertain in the present proceedings. Among the criteria stated in this document are: 3.1.3 Waste and Wastewater Service - Potable water and wastewater facilities must be identified. The Applicant for a Surface Water Management Permit must provide information on how these services are to be provided. If wastewater disposal is accomplished on-site, additional information will normally be requested regarding separation of waste and storm systems. 3.2.1.4 Flood protection - Building floors shall be above the 100 year flood elevations, as determined from the most appropriate information, including Federal Flood Insurance Rate Maps. Both tidal flooding and the 100 year, 3 day storm event shall be considered in determining elevations. b. Commercial and industrial projects to be subdivided for sale are required to have installed by the permittee, as a minimum, the required water quality system for one inch of runoff detention or one half inch of runoff retention from the total developed site. State standards - Projects shall be designed so that discharges will meet State water quality standards, as set forth in Chapter 17-3, Retention/detention criteria - Retention and/or detention in the overall system, including swales, lakes, canals, greenways, etc., shall be provided for one of the three following criteria or equivalent combinations thereof . . . Wet detention volume shall be provided for the first inch of runoff from the developed project, or the total runoff from a 3-year, 1-hour rainfall event, whichever is greater. Dry detention volume shall be provided equal to 75 percent of the above amounts computed for wet detention. Retention volume shall be provided equal to 50 percent of the above amounts computed for wet detention. 3.2.4.1 Discharge structures should include gratings for safety and maintenance purposes. The use of trash collection screens is desirable. Discharge structures shall include a "baffle" system to encourage discharge from the center of the water column rather than the top or bottom. 3.2.4.4.2 b. Control elevations should be no higher than 2 feet below the minimum road centerline elevation in the area served by the control device in order to protect the road subgrade. Simply detaining runoff before discharging it offsite will not insure that the water quality standards set forth in Chapter 17-3 will be met. Whether the standards are met depends on, among other things, the composition of the runoff. FWF'S INTEREST Among the purposes of the FWF, as stated in its charter, Shall be to further advance the cause of conservation in environmental protection, to perpetuate and conserve fish and wildlife, oil, water, clean air, other resources of the State and so manage the use of all natural resources, that this generation and posterity will receive the maximum benefit from the same. (T. 248-9) Four or five thousand Floridians belong to FWF. FWF members "make use" (T. 250) of the waters of Lake Okeechobee, the Kissimmee River and specifically of the waters in C-38. PROPOSED FINDINGS CONSIDERED The applicants and FWF filed post hearing memoranda and proposed recommended orders including proposed findings of fact which have been considered in preparation of the foregoing findings of fact. They have been adopted, in substance, for the most part. To the extent they have been rejected, they have been deemed unsupported by the weight of the evidence, immaterial, cumulative or subordinate.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That SFWMD deny the pending application for surface water management permit. DONE and ENTERED this 29th day of November, 1983, in Tallahassee, Florida. ROBERT T. BENTON II, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of November, 1983. COPIES FURNISHED: Dennis J. Powers, Esquire Gunster, Yoakley, Criser & Stewart 400 South County Road Palm Beach 33480 Terrell K. Arline, Esquire 325-C Clematis Street West Palm Beach, Florida 33401 Irene Kennedy Quincey, Esquire 3301 Gun Club Road West Palm Beach, Florida 33406 Charles P. Houston, Esquire 324 Datura Street, Suite 106 West Palm Beach, Florida 33401

Florida Laws (2) 120.57120.60 Florida Administrative Code (1) 40E-4.301
# 4
WILLIAM H. AND PATRICIA H. MELLOR, ET AL. vs. COUNTY LINE DRAINAGE DISTRICT AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 83-000082 (1983)
Division of Administrative Hearings, Florida Number: 83-000082 Latest Update: Jun. 21, 1991

Findings Of Fact The CLDD was established pursuant to Chapter 298, Florida Statutes, on August 4, 1967. Its purpose was to "reclaim" or render the land within its boundaries usable for agricultural purposes. The land comprising the CLDD consists of approximately 3,500 acres in Lee County, mostly planted in citrus trees. Pursuant to the requirements of Chapter 298, Florida Statutes, a "Plan of Reclamation" was prepared by consulting engineers for the CLDD's Board of Supervisors in August, 1967. That plan contains provisions for reclaiming lands within the CLDD's boundaries and for managing and controlling surface water within CLDD. The method of water control outlined in the 1967 reclamation plan included a dike and ditch system around the boundaries of CLDD with a series of interior canals to carry excess water away from the citrus trees. The land in the north part of he CLDD is higher than the south and water generally, naturally flows from north to south. The interior canals were designed to carry water in accordance with existing contours of the land and eventually discharge excess surface water to the rim ditches on the north and east sides of Spoil Area "M," which is south of the CLDD and which was then owned by the C&SFFCD, the predecessor agency to SFWMD. The system of drainage delineated in that 1967 plan, inaugurated pursuant to Chapter 298, Florida Statutes, was put into effect substantially as described therein. CLDD's 1967 plan was altered somewhat because of an agreement entered into on September 30, 1971, between the CLDD and neighboring landowner Kenneth Daniels. Pursuant to that agreement, the two parties agreed to extend the dike on the west side of the CLDD property and construct a ditch from a point 50 feet north of the northwest corner of the Petitioner Mellor's property, which new ditch was to run southwest across the Daniels' property and connect with Spanish Creek. That ditch or canal would thus connect the western rim ditch of the SFWMD's Spoil Area "M" with Spanish Creek and have the result that surface waters could be discharged from CLDD lands through the western rim ditch of Spoil Area "M" thence through the "Daniels' Ditch" finally discharging into the lower reaches of Spanish Creek. (see Exhibits 1 and 11) Because the western side or western rim canal of the SFWMD's Spoil Area "M" had not been used under the original plan of reclamation approved by the C&SFFCD, CLDD sought permission from C&SFFCD to use this western rim canal for the purpose stated pursuant to the agreement with Daniels. Thus, CLDD's proposed use of the rim canal of Spoil Area "M" would be confined to the western, northern and eastern perimeter canals and not the southern boundary canal. All affected landowners, Kenneth Daniels as well a Jake and Lilly Lee, agreed to those proposed installations and uses. The resulting agreement between CLDD and C&SFFCD was entered into on October 12, 1972, and describes the flood control District land to be used by CLDD as a 100 foot wide strip running along the west, north and east sides of Spoil Area "M," also know as "Aspic." This 100 foot wide strip of land running thusly is co-extensive with the rim ditch of Spoil Area "M." The CLDD was mandated by this agreement to install 72- inch pipes in the rim ditch at the southwest corner of the spoil area, just north of the Mellor property, giving a point of discharge from the western rim ditch into the Daniels' Ditch with similar pipes connecting that Daniels' Ditch with Spanish Creek, such that the canal between these two points could carry water from the west rim ditch to Spanish Creek. The easement incorporated in this agreement was to last for five years with an option for a five-year renewal, which option was exercised. At the end of this 10-year period, SFWMD, successor to C&SFFCD, notified CLDD that because its statutory authority had since changed, the easement could not be renewed and that CLDD would have to seek the subject permit so as to be authorized to use works and lands of the District. The requirements to be met by an applicant for a right-of-way permit such as this one are set out in Rule 40E-6.301, Florida Administrative Code, and SFWMD's permitting information manual, Vol. V, Criteria Manual for Use of Works of the District, July, 1981, which is incorporated by reference in that rule. In that connection, the permit at issue, if granted, would not cause an interference with the "works" of the District, that is dikes, ditches, flood control structures arid drainage structures because it would merely renew the pre-existing authorized use. The permit will not be inconsistent with an comprehensive water use plan developed by the District. Further, the permit applicant owns or leases the land adjacent to the portion of the "works of the District" involved herein that is the east, north and west rim ditches of Spoil Area "M," the Daniels' Ditch and the pipes at either end of it coupled with the water control structures at the southeast corner and southwest corners of Spoil Area "M," which control water entering the south rim ditch. CLDD has a surface water management permit, issued in August, 1980, which is a prerequisite to the granting of the subject right-of-way permit. It remains in full force and effect. That surface water management permit authorizes "operation of a water management system serving 3,642 acres of agricultural lands by a network of canals and control structures, with a perimeter dike and canal discharging into Cypress Creek." The "surface permit" authorized the system of drainage and discharge in existence at the time of its issuance, May 8, 1980. The system of drainage, at the day of the hearing, consisted of the same basic water flow and discharge pattern that existed for approximately 10 years, and this permit would allow that to be continued, thus, there will not be any additional effect on environmentally sensitive lands occasioned by an issuance of the subject right-of-way permit. The surface water management permit, by its terms, refers initially to the operation of a water management system" . . . discharging into Cypress Creek." The reference to "Cypress Creek" was an administrative error. The express language on the face of the permit authorization incorporates by reference the application, including all plans and specifications attached thereto, as addressed by the staff report, and those materials, including the staff report, are a part of the permit. The complete permit, including all those documents incorporated by reference, makes it clear that the authorization of the surface water management permit was that the system of drainage in existence at the time of permit issuance (1980) was that which was being approved, and that included discharge to Spanish Creek and not Cypress Creek. Discharge of water to Cypress Creek as an alternative was never recommended or authorized by that surface water management permit. This is clearly the intent expressed in the permit in view of the language contained in a special condition of that surface water management permit imposed by the SFWMD as a condition for issuance which stated as follows: Within 45 days of the issuance of this permit the permittee shall submit for staff approval a proposal and schedule for the elimination of the adverse impacts being created by the operation of the permittee's water management system, which can be legally and physically accomplished by the permittee. Adverse impacts are considered herein to be reduced flows to Spanish Creek and increased flows to Cypress Creek. Thus, it is obvious that the authorization of the surface water management permit was designed to provide for discharge into Spanish Creek and to enhance the flows to Spanish Creek pursuant to a required proposal which the permittee submitted to SFWMD. Thus, the right-of-way permit applied for herein is consistent with the valid surface water management permit held by the permit applicant in this proceeding. Petitioners William H. and Patricia H. Mellor are co-owners of parcels of property lying some distance south of Spoil Area "4" in the vicinity of the Caloosahatchee River. This property does not abut the spoil area at any point. Spanish Creek does cross their property several thousand feet south of the south boundary of the spoil area. In the past, particularly in 1982, water flowing from the south rim ditch of the spoil area through a break in the dike of that south rim ditch, has flowed through a ditch known as Dry Creek in a generally southerly direction under S.R. 78 and has washed out an access road constructed by William Mellor which leads from Highway 78 to his property. He had this washout repaired at his own expense in 1982. The washout was caused by water from CLDD flowing into the south rim canal of Spoil Area "M," that is, the ditch that traverses (and defines) the southerly boundary of the spoil area. Mr. Mellor admitted, however, that SFWMD had at least partially plugged the opening in the south rim ditch which had allowed flow down the Dry Creek ditch and wash out his road. If closed water control structures are maintained at the southwest and southeast corners of the spoil area ditches, then no water could flow into the south rim canal and no such injury could again be caused. Petitioner's Jim English and Patricia Mellor are co-owners of a 45- acre parcel of land located in the southwest corner of Spoil Area "M." The five acres forming the extreme southwest corner of the spoil area do not belong to these Petitioners, but are owned by one Lynwood Brown, who is not a party to this proceeding. The English/Mellor property forms a part of the spoil area, but does not adjoin or constitute any part of the spoil area which is sought to be used by CLDD through the proposed right-of-way use permit (as clarified by CLDD's stipulation). The south rim ditch, either part of, or adjoined by their property, has been used for water storage in the past (they maintain illegally) 1/ Mr. Tom Pancoast has observed Spanish Creek frequently over a nine- year period starting in approximately 1973. He has often used those waters during that period for fishing. During the early years of his use and observation of Spanish Creek, the water flowed out of Spanish Creek into the Caloosahatchee River. Beginning in about 1976, the water appeared to be flowing in the opposite direction, from the river into Spanish Creek. Contemporaneous with this hydrologic change, the creek has become increasingly characterized by siltation and hyacinth growth. Mr. William Mellor owns property along the course of Spanish Creek. He has used the stream for recreational purposes, picnicking where the stream traverses his property. In recent years there has occurred a marked increase in the growth or profusion of aquatic plants of unidentified types in the creek, reduced clarity and reduced flows or volumes of water in the creek. Witness English has made a similar observation. Witness James English has a substantial degree of training by formal education and experience in water management and drainage practices and methods, particularly as they relate to citrus grove development and management in southwest Florida. Mr. English has observed Spanish Creek regularly for most of his life, including the region of its headwaters in the "Cow Prairie Cypress," a remnant wetland cypress strand lying within the CLDD immediately north of Soil Area "M." The chief adverse impact of the CLDD water management system is reduced flow to Spanish Creek, especially its upper reaches since the advent of the "Daniels' Ditch" as a drainage route and discharge point into lower Spanish Creek. However, the only special condition on the issuance of the surface water management permit approving CLDD's extant water management system was the requirement that CLDD should submit a plan for eliminating that adverse effect, which it did (as Petitioner English admits). Beyond the submission of such a plan, no concrete action designed to restore historic flows to Spanish Creek has yet begun, however. The restoration of historic flows, adequate in volume and quality, to the entire creek system would require discharging water from CLDD's system to the Cow Prairie Cypress area at the headwaters of the creek rather than substantially further downstream at the present Daniels' Ditch site. The Petitioners' complaints (aside from the issue of adequacy of flows in Spanish Creek), although meritorious, are, because of stipulations asserted by CLDD during the course of this proceeding, now rendered moot. CLDD stipulated that it only seeks a permit to use the west, north and eastern spoil area ditches. It does not seek and stipulated that it will not use, at any time, the south rim ditch and will maintain water control structures so to block water from entering that ditch. This will alleviate the problem of potential storage of water on Petitioners English and Patricia Mellor's property and the erosion problem on Petitioners William and Patricia Mellor's property south of the spoil area. It was thus established that the issuance of the right-of-way permit will not cause the injuries these Petitioners have suffered in the past because of use of the south rim ditch for water drainage and storage.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence in the record and the candor and demeanor of the witnesses, it is, therefore RECOMMENDED: That the South Florida Water Management District grant the County Line Drainage District's application for a permit for utilization of works and lands of the District. Subject to the following special condition: Issuance of this right-of-way permit does not relieve the Respondent CLDD from the responsibility of complying with special condition number 1 of the surface water management permit number 36-00184-S. Respondent CLDD shall, within 30 days of date of permitting, submit a design to the satisfaction of the SFWMD staff which will prevent the ability of CLDD to discharge to the southern rim ditch, described above. DONE and ENTERED this 29th day of September, 1983, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of September, 1983.

Florida Laws (2) 120.57373.085 Florida Administrative Code (1) 40E-6.011
# 5
CARLOS M. BERUFF vs SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 99-004159 (1999)
Division of Administrative Hearings, Florida Filed:Bradenton, Florida Oct. 04, 1999 Number: 99-004159 Latest Update: Mar. 15, 2002

The Issue The issue is whether Petitioner is entitled to an environmental resource permit for a surface water management system and the alteration of a wetland in connection with the construction of two warehouses, paved parking and loading areas, a detention pond, and enhancement of the remainder of the existing wetland. If not otherwise entitled to the permit, an additional issue is whether Petitioner is entitled to the permit through an exemption, waiver, or variance from the standard requirements for mitigation.

Findings Of Fact Background Petitioner Carlos M. Beruff, as Trustee under Florida Land Trust No. 22 dated March 30, 1989 (Petitioner), purchased 85 acres of land in Manatee County for $1.2 million in May 1989. (All acreages are approximate.) The east boundary of the 85-acre parcel consists of about 1700 feet of frontage along U.S. Route 301. One month after the purchase, Petitioner sold 70 of the 85 acres for $1.6 million. In the intervening month, Petitioner incurred no significant expenses for development or marketing, although the development and marketing expertise of Carlos Beruff facilitated the $1.6 million sale. The 70 acres that were sold included the frontage on U.S. Route 301. The 15 acres remaining after the sale comprise two tracts of 9 and 5.88 acres. In these cases, Petitioner seeks an environmental resource permit (ERP) for activities involving the 5.88-acre parcel (Site). The 9-acre parcel occupies the northwest corner of the 85-acre parcel. The Site, which was platted in 1911, is the only noncontiguous land constituting the 85-acre parcel; it is 450 feet south of the remainder of the 85-acre parcel. The sole parcel between the Site and the remainder of the 85- acre parcel was originally owned by Lowe's and is now owned by Cheetah Technologies (Cheetah Parcel). The 5.88-acre Site is subject to a road right-of-way of 0.32 acres in favor of the Cheetah Parcel. Of the remaining 5.56 acres, 4.66 acres are wetland and 0.9 acres are upland. The 0.9 acres of upland are subject to an access easement of 0.42 acres, also in favor of the Cheetah Parcel, so the net available upland acreage is only 0.48 acres. The Cheetah Parcel occupies the northwest corner of U.S. Route 301 and Saunders Road (also known as 63rd Avenue East). The Site is immediately west and south of the Cheetah Parcel and occupies the northeast corner of Saunders Road and 24th Street East (also known as Arlin Road). The Site is about 530 feet west of the intersection of U.S. Route 301 and Saunders Road. U.S. Route 301 is a major arterial, and Saunders Road is at least a major collector road. The Site contains about 600 feet of frontage along Saunders Road and 465 feet of frontage along 24th Street East. The Site is in unincorporated Manatee County roughly midway between downtown Bradenton and downtown Sarasota. Saunders Road crosses a north-south railroad line approximately one-half mile west of the Site and Bowlees Creek about 650 feet west of the railroad track. The 9-acre parcel still owned by Petitioner is about 350 feet north-south by 1250 feet east-west. The western boundary of the 9-acre parcel runs along the east side of the railroad line. Like the other parcels involved in this case, the 9-acre parcel drains into Bowlees Creek. The Site is in an area characterized by industrial land uses, including warehouses, a junkyard, an industrial center, and a bakery. A halfway house for persons recently released from prison is located one-quarter mile to the west of the Site. The Site is zoned HM (heavy manufacturing), which is a limited, and thus valuable, zoning category in Manatee County. Respondent has issued three relatively recent surface water management permits that are relevant to these cases: a 1986 permit for the development of the Cheetah Parcel (Cheetah Permit), a 1988 permit for the widening of Saunders Road from two to four lanes (Saunders Road Permit), and a 1989 permit for the construction of a commercial park north of the Site known as 301 Park of Commerce (301 Permit). Bowlees Creek runs from north to south, emptying into Sarasota Bay across from Longboat Key. Sarasota Bay is an Outstanding Florida Water. Bowlees Creek drains a nine square-mile basin, which is about 21-25 percent developed. The Bowlees Creek basin is an open drainage basin. Due to flooding problems, Manatee County has imposed special limitations upon development within the Bowlees Creek basin. Among these limitations is that the rate of post- development runoff must be less than the rate of pre- development runoff--up to 50 percent less, according to expert witnesses for both sides (Lawrence Weber, Tr. Vol. III, pp. 118-19; and Daryl Flatt, Tr. Vol. IV, p. 230). By stipulation, the Site is at the extreme eastern end of the Bowlees Creek basin. In fact, the Site may have historically drained into Bowlees Creek and will drain into Bowlees Creek after, as described below, the northwest window is added to the surface water management system. In 1993 or 1994, Petitioner began the process of developing the Site following the sale five years earlier of the larger 70-acre parcel. Mr. Beruff has been in the development business for 20 years. His career began in 1980 when Mr. Beruff became an employee for U.S. Homes and Modern Builders; he became self-employed in 1984. Mr. Beruff has developed seven commercial and ten residential developments. Application Process Deciding to pursue warehouse development for the Site, Petitioner initiated the development process by hiring an engineer and environmental consultant. With the assistance of these consultants, Petitioner prepared its application for an ERP. By application dated October 9, 1998, and filed November 13, 1998, Petitioner requested that Respondent issue an individual ERP for the construction on the Site of a surface water management system in connection with the construction of two warehouse buildings, paved parking and loading areas, and a detention pond, as well as the enhancement of the remainder of the existing wetland (Application). The Application states that the total building, parking, and loading areas would be 58,026 square feet and that wetlands constitute 3.37 acres of the 5.88-acre Site. The site plan attached to the Application shows a "wetland preservation & enhancement" area of 1.592 acres at the north end of the Site. To the south, toward Saunders Road, are two buildings with paved parking and loading areas. On the southwest corner is a "stormwater treatment & attenuation" area. After several discussions with Respondent's staff, Petitioner modified the proposed development. In its latest revision, the footprint of the proposed development would occupy 2.834 acres of wetland, leaving 1.826 acres of wetland. On November 13, 1998, Petitioner filed a Petition for Exemption, Waiver or Variance as to Mitigation Requirements, seeking an exemption, waiver, or variance from all laws requiring offsite mitigation or additional onsite mitigation for the portion of the wetland that would be destroyed by the proposed development. Drainage At present, the Site receives runoff from a total of 27 acres. The offsite contributors of runoff are the Cheetah Parcel and a segment of Saunders Road east of 21st Street East. These locations have drained into the Site for hundreds of years. In general, drainage raises two distinct issues: water quality and water quantity. For an open drainage basin, the issue of water quantity expresses itself primarily in runoff discharge rate, although historic basin storage is also an issue. As discussed in the Conclusions of Law, the Respondent's Basis of Review identifies different storm events to which applicants must design different components of surface water management systems. For water quantity, the system may release no more than the permitted discharge rate in the design storm, which is the 25-year, 24-hour storm event. At present, the design storm would produce about eight inches of rain, although the same design storm, due to a different model or modeling assumptions, produced 9.5 inches of rain at the time of the issuance of the permit for the Cheetah Parcel. (The practical effect of this change in the calculation of the design storm is that the quantitative capacity of the surface water management system of the Cheetah Parcel is nearly 20 percent greater than would be required today.) For water quality, the system must capture the first inch of runoff (sometimes only the first half-inch of runoff, depending on the type of system and receiving waterbody). In contrast to the relatively infrequent 25-year storm, approximately 90 percent of the storms in Respondent's jurisdiction produce no more than one inch of runoff. The underlying premise is that the first inch of runoff contains nearly all of the contaminants that will be flushed from impervious surfaces. The Cheetah surface water management system features a wetland and a retention pond along the north property line of the Site. The Cheetah pond and wetland attenuate runoff before allowing it to drain south onto the Site. The Cheetah surface water management system also includes a swale running north along 24th Street East to take runoff eventually to Bowlees Creek. The Saunders Road surface water management system discharging onto the Site consists largely of an underground, offline storage and attenuation system that stores excess runoff, as compared to pre-development rates, in lateral pipes off a weir. Nothing in the record suggests that the surface water management systems authorized by the Cheetah Permit or the Saunders Road Permit fail to provide reasonable assurance that the discharged runoff is of satisfactory water quality. Following their respective permits in 1986 and 1988, respectively, the rates of discharge of runoff from the Cheetah Parcel and Saunders Road were no greater post- development than they had been pre-development. The Cheetah Parcel post-development and pre-development discharge rates were both 10.6 cubic feet per second (cfs). The Saunders Road post-development and pre-development discharge rates were both 32.4 cfs. In issuing the 301 Permit, Respondent authorized the construction of a drainage system that would take runoff north along 24th Street East and then west, eventually emptying into Bowlees Creek. Conforming to the previous drainage system, the new system replaced an open ditch with underground stormwater pipes. Of particular relevance to the Site, two prominent features of the system authorized by the 301 Permit were windows in the vicinity of the southwest and northwest corners of the Site (Southwest Window and Northwest Window). A window is an opening in the wall of a hardened structure whose purpose includes drainage. The opening is constructed at a certain elevation and a certain size to allow specified volumes or rates of water to pass into the structure and then offsite. The 301 Permit authorized the construction of a swale along the southwest corner of the Site to direct runoff discharging from the Saunders Road system into the Southwest Window. This swale has been construed. However, several problems have precluded the construction of the Southwest Window, probably permanently. The most serious problem, from an engineering perspective, is the failure to lay the stormwater pipe along 24th Street East at the proper depth. The stormwater pipe was erroneously installed at an elevation of 15.32 feet National Geodetic Vertical Datum (NGVD), and the Southwest Window was to have been cut at a control elevation of 14.75 feet NGVD. The discharge elevation of the Saunders Road outlet precludes raising the control elevation of the Southwest Window sufficiently to allow gravity drainage into the stormwater pipe. Exacerbating the discrepancy among the as-built elevations of the three structures is what appears to be a design problem belatedly recognized by Respondent. Respondent is justifiably concerned that the Southwest Window, at a control elevation of 14.75 feet NGVD, would draw down the water elevation of the Site's wetland, which is at a wet season elevation of 16.5 feet NGVD (now actually 17 feet NGVD, possibly due to the absence of the Southwest Window). A third problem with the Southwest Window is that the southwest corner of the Site was not historically a point of discharge, so the Southwest Window would deprive the Site's wetland of runoff. Fortunately, neither the Southwest nor the Northwest Window is essential for the proper operation of the surface water management system of 301 Park of Commerce, which largely depends on a series of lakes for treatment and attenuation. The Northwest Window was to be at elevation 16.5 feet NGVD, and its construction would provide needed drainage for the Site. In general, the Northwest Window does not raise the same concerns as does the Southwest Window. The Northwest Window is in the vicinity of the historic point of discharge for the Site and replaces a ditch permitted for the Cheetah Parcel to take runoff north along 24th Street East. The Northwest Window would also alleviate a standing-water problem at the northwest corner of the Site. However, Manatee County, which controls the right- of-way on which the Northwest Window is located and is responsible for its construction and maintenance, has discovered that it lacks a sufficient property interest to access the Northwest Window. The County has since initiated the process by which it can obtain the necessary interest, and, once completed, the County will cut the Northwest Window into the existing structure. Due to the role of the Northwest Window in draining the runoff in the area, including the Site, the Application reincorporates the Northwest Window, as it should have been constructed pursuant to the 301 Permit. Although the Cheetah and Saunders Road permits resulted in greater runoff volume entering the Site, more importantly to area drainage, these permits did not result in greater runoff rates and or in a deterioration in runoff water quality. Likewise, the failure to construct the Southwest Window and Northwest Window is not especially relevant to area drainage, nor is the likely inability ever to construct the Southwest Window. Far more important to area drainage is the fact that Petitioner proposes that the Site, post-development, would produce a runoff rate of 10.6 cfs, as compared to a pre-development runoff rate of 7 cfs. A serious adverse impact to area drainage, the proposed activity increases the runoff rate by 50 percent in a floodprone, 80-percent builtout basin--a basin of such sensitivity that Manatee County is imposing a post-development requirement of substantially reduced runoff rates. The cumulative impacts of the proposed development, together with existing developments, would be to cause substantial flooding of the Bowlees Creek basin. Petitioner's expert attempted to show that the runoff from the Site, which is at the extreme eastern end of the Bowlees Creek basin, would be delayed sufficiently so as not to exacerbate flooding. Respondent's expert thoroughly discredited this testimony due, among other things, to its reliance upon obsolete data and an unrealistic limitation upon the assumption of the direction of travel of storms. Similarly, Petitioner failed to prove that the authorized discharge rate for the 301 Permit is 42 cfs. This assertion is most succinctly, though not exclusively, rebutted by the fact that the 42-inch pipe can only accommodate 18 cfs. Even if the 42-inch pipe could accommodate a substantially greater runoff rate, Petitioner's expert would have erroneously inferred a permitted discharge rate from this increased capacity without negating the possibility that other structures in the 301 surface water management system effectively reduced the rate or that oversized structures existed to accommodate higher runoff rates in storms greater than the design storm. In addition to increasing the runoff rate by 50 percent, Petitioner's proposal would also reduce the historic basin storage by over 40 percent. Displaced basin storage moves downstream, increasing flood levels from fixed storm events. At present, the Site provides 8.68 acre-feet of historic basin storage. The Application proposes to replace this storage with storage in the wetland and retention pond totaling only 4.9 acre-feet. The loss of 3.8 acre-feet of basin storage means that this additional volume of water would, post-development, travel down Bowlees Creek. A final drainage deficiency in Petitioner's proposal arises out of a berm's proposed outside of the Northwest Window. A one-foot bust in the survey of Petitioner's expert would have resulted in this berm preventing runoff from entering the Site from the Cheetah Parcel, as runoff presently does. Respondent's expert suggested several possible alternatives that might result in a permittable project with respect to post-development runoff rates (the record is silent as to the effect of these alternatives upon historic basin storage, although it would seem that they would add storage). Reducing the area of destroyed wetlands to one acre would probably reduce the excess of post-development runoff rate to 1-2 cfs. Petitioner could then obtain offsetting attenuation through a variety of means, such as by obtaining an easement to use the wetland on the Cheetah Parcel, constructing an attenuation pond on the 9-acre parcel, or constructing underground vaults in the filled area of the wetland on the Site. Wetlands Except for the road right-of-way, the Site is undeveloped and forested. The presence of 25-year-old red maples militates against attributing the transition from an herbaceous to a forested wetland to the failure to install the Northwest and Southwest windows. More likely, this transition to the sub-climax species of red maple and willow (in the absence of a cypress source) is due to the repression of fire on the Site. Experts for the opposing sides differed sharply in their biological assessments of the wetland. Petitioner's expert described a stressed wetland whose impenetrable thicket provided habitat only to a lone rat and swarm of mosquitoes. Respondent's expert described a robust wetland featuring a luxuriant overstory of red maple and Carolina willow; an rich understory of ferns, and diverse wildlife ranging from birds in the air (direct evidence); fish, snails, and tadpoles in a small pond (direct evidence); and squirrel and opossum (indirect evidence) scampering (indirect evidence) among the buttonbush, elderberry, and wax myrtle (direct evidence). Undoubtedly, the wetland has been stressed; approximately 30 percent of the wetland vegetation is Brazilian pepper, which is a nuisance exotic. However, the wetland is well hydrated. Issuance of the Cheetah Permit was predicated, in part, upon the rehydration of the wetland on the Site. With the issuance of the Cheetah Permit and especially the Saunders Road Permit, the quality of water entering the wetland has improved by a considerable amount. As already noted, added volumes of runoff are entering the wetland since the issuance of these two permits, although post-development runoff rates are the same as pre-development runoff rates. On balance, the wetland is functioning well in providing habitat and natural drainage functions. Giving due weight to the current condition of the wetland, the enhancement offered by Petitioner does not approach offsetting the loss of wetland area. In return for destroying 2.83 acres of the wetland, Petitioner proposed the enhancement of the remaining 1.83 acres by removing exotic species to no more than 10 percent of the total vegetation. The mitigation is plainly insufficient because of the level of functioning of the entire wetland at present. Additionally, Petitioner has failed to demonstrate that the Brazilian pepper, which is the major nuisance exotic occupying the Site, is evenly distributed; to the contrary, it is present mostly outside the wetland, along a berm just outside of the wetland. The lack of seedlings and old specimens suggests that the Brazilian pepper population may not be stable and may itself be stressed. Petitioner's failure to show that the remaining wetland area has more than 10 percent infestation or is likely to suffer additional infestation further undermines the effectiveness of the proposed mitigation. Respondent has never issued an ERP for a proposed activity involving the alteration of wetlands when the enhancement mitigation ratio is as low as .65:1, as Petitioner proposes. In general, Respondent requires higher mitigation ratios when proposals involve wetlands enhancement, rather than wetlands creation, because the wetlands to be enhanced are already functioning--in these cases, at a relatively high level. Although Petitioner has been unwilling to consider such alternatives, numerous alternatives exist for offsite mitigation or mitigation banking, if insufficient area exists for adequate onsite mitigation. Lastly, Petitioner devoted considerable effort at hearing to portraying Respondent's handling of the Application as flawed and unfair. However, the evidence does not support these assertions. Most strikingly, Respondent's staff treated the drainage windows inconsistently, to the benefit of Petitioner. They treated the Northwest Window as installed for the purpose of calculating the pre-development runoff discharge rate to Bowlees Creek. Until the Northwest Window is installed, the actual rate is even lower. This approach is justifiable because the Northwest Window will be installed at some point. On the other hand, Respondent's staff ignored the higher wetland elevation on the Site, presumably resulting from the absence of the Southwest Window. However, this approach, which benefits Petitioner in calculating wetland drawdown effects, is unjustifiable because the Southwest Window probably will never be installed. Petitioner's specific complaints of unfair treatment are unfounded. For example, Petitioner suggested that Respondent credited Lowe's with wetland acreage for the littoral shelf of its wetland, but did not do so with the wetland on the Site. However, Petitioner produced no evidence of similar slopes between the two shelves, without which comparability of biological function is impossible. Additionally, Petitioner ignored the possibility that, in the intervening 14 years, Respondent may have refined its approach to wetland mitigation. Although occurring at hearing, rather than in the application-review process, Respondent's willingness to enter into the stipulation that the Site presently drains into Bowlees Creek, despite recent data stating otherwise, was eminently fair to Petitioner. Absent this stipulation, Respondent would have been left with the formidable prospect of providing reasonable assurance concerning drainage into the floodprone Bowlees Creek when the post-development rate was 10.6 cfs and the pre-development rate was 0 cfs.

Recommendation Based on the foregoing, it is RECOMMENDED that Respondent deny Petitioner's application for an environmental resource permit and for an exemption, variance, or waiver. DONE AND ENTERED this 29th day of February, 2000, in Tallahassee, Leon County, Florida. ___________________________________ ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of February, 2000. COPIES FURNISHED: S. W. Moore Tracey B. Starrett Brigham. Moore, Gaylord, Schuster, Merlin & Tobin, LLP 100 Wallace Avenue, Suite 310 Sarasota, Florida 34237-6043 Mark F. Lapp Jack R. Pepper Assistant General Counsel Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609 E. D. "Sonny" Vergara Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (17) 120.54120.542120.569120.57267.061373.042373.086373.403373.406373.413373.414373.416373.421380.06403.031403.061403.201 Florida Administrative Code (6) 40D-4.09140D-4.30140D-4.30240D-40.30162-302.30062-4.242
# 6
GEORGE H. HODGES, JR. vs. JACKSONVILLE SHIPYARDS, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 86-000365 (1986)
Division of Administrative Hearings, Florida Number: 86-000365 Latest Update: Oct. 16, 1986

The Issue Respondent Jacksonville Shipyards, Inc. (JSI) filed a permit application with the State of Florida, Department of Environmental Regulation, (DER), for permission to conduct maintenance dredging in a basin associated with its shipyard operation. This permit application was made in accordance with Chapter 403, Florida Statutes, and Chapter 17, Florida Administrative Code. In the face of DER's statement of intent to grant this permit, George H. Hodges, Jr., (Petitioner), has petitioned in protest. Therefore, the issues to be considered in this dispute concern the entitlement of JSI to the grant of an environmental permit for maintenance dredging of its shipyard basin.

Findings Of Fact DER is an agency of the State of Florida charged with the environmental protection of waters within Florida. Its authority includes regulatory powers announced in Chapter 403, Florida Statutes, and Chapter 17, Florida Administrative Code. Certain activities involving state waters require permission from DER before they be lawfully undertaken. Among those activities are dredge projects such as contemplated by JSI in its pending request to be allowed to maintenance dredge as much as 66,000 cubic yards of material per year from its shipyard basin located in Jacksonville, Duval County, Florida. This is an undertaking which is envisioned by Chapter 403, Florida Statutes, related to the permit responsibility of DER. It is specifically addressed by Rule 17-4.28, Florida Administrative Code, in which is found the statement of permit requirements for dredge and fill activities. JSI, the applicant, operates a facility known as Bellinger Shipyard, which is engaged in the repair and maintenance of commercial and naval vessels. This enterprise includes the drydocking of vessels upon which repairs are effected, through the use of several drydock chambers in shipyard basin. In the course of the maintenance, a technique known as "gritblasting" is employed. The purpose of this "gritblasting" is to clean the ships in anticipation of repainting. On occasion the "gritblasting" would remove all coats of paint down to the metal finish of the ship. The paints being removed contain antifouling and anticorrosive materials. Those materials have, among other properties, the ability to repel marine organisms, causing their mortality. The "gritblasting" process utilizes a material known as "black beauty." This is a waste product from firing power plant boilers and it contains iron, silica, aluminum, titanium, magnesium, lime, penta oxide (P2O5), sodium oxide, sulfur trioxide and potassium oxide. The "black beauty" is applied through the use of a pressurized system which forces the material onto the treated surface under pressure of 70 to 85 pounds per square inch. After the preparation is made, vessels under repair are repainted, and similar paint with antifouling and anticorrosive properties is reapplied. During the "gritblasting" process, dust is generated and a portion of that material finds its way into the water within the basin. Other particles being removed drop to the deck surface of the drydock. When paint is reapplied to the surface of a vessel undergoing repair, it is given the opportunity to dry and the vessel is then refloated and removed from the drydock. To do this, the drydock itself is submerged. When the vessel has exited the drydock facility, the drydock resurfaces and is allowed to dry out. The material which has been removed from the surface of the repaired vessel is then shoveled into containers and transported to an offsite sanitary landfill for disposal. This material removed includes the "gritblasting" compound and paint which has been stripped from the surface of the vessel. When the drydock is submerged following vessel servicing, the inference can be drawn that a certain amount of the materials on the drydock deck surface will be introduced into the water within the basic before the drydock is resurfaced. The arrangement for refloating the vessel is the reverse of the technique employed in lifting the vessel out of the water for maintenance. When the vessel is brought in for service, it is guided into a submerged drydock. Water is then pumped out of the hollow drydock walls and deck to raise the vessel out of the water, allowing access to the vessel, which is completely above the water surface, as is the drydock work deck. The basin in which the business activities of JSI take place is located on the western shore of the Intercoastal Waterway. The Waterway and basin are part of an estuarine system, as these water bodies are tidally influenced. The basin and the Intercoastal Waterway constitute Class III waters of Florida. The configuration of the basin is as found in JSI Exhibit 16, an aerial photograph of the site. Moving from east to west within the basin, it is approximately one thousand feet from the Intercoastal Waterway to the back of the basin in its western-most extremity. In the back area of the basin the north- south axis is 250 feet. The interface between the basin and the Intercoastal Waterway on the eastern reach north-south axis is approximately 625 feet. There are no obstructions to the confluence of the Intercoastal Waterway and the eastern side of the repair basin. The southern-most reach of the basin is approximately 350 feet in length running east to west. On the eastern side of the basin there is a pier area which is roughly 360 feet north-south by 60 feet east-west. As described before, the pier is not a solid structure extending to the bottom of the water. Thus, water can be exchanged between the basin and the Intercoastal Waterway beneath the pier. JSI had acquired the Bellinger Shipyard in 1974. At that time environmental permits had been issued allowing for the maintenance dredging of the basin. These permits were valid through 1975. In 1975, JSI obtained a dredge and fill permit from the Florida Board of Trustees of the Internal Improvement Trust Fund, as well as a dredge and fill permit from the United States Corps of Engineers. These permits were for a ten-year period. They allowed maintenance dredging in the amount of 66,000 cubic yards per annum and for the disposal of the dredged material in an EPA-approved offshore site. In 1980 DER confirmed the dredge and fill permit that had been obtained from the Florida Board of Trustees. This permit by DER required JSI to conduct monitoring of turbidity during dredging, but did not require employment of turbidity screens. In 1979 the Army Corps had required JSI to conduct bioassay analysis in furtherance of the federal dredge and fill permit. In the face of the results obtained in that bioassay analysis, the Army Corps continued the dredge and fill permit to JSI dating from August 14, 1980. A subsequent extension of the federal permit was given through August 14, 1986. Contemporaneous with the present permit application before DER, JSI has requested further permission from the Army Corps related to the ability to excavate as much as 66,000 cubic yards of material on an annual basis. JSI has not been cited by any regulatory agency related to water quality violations associated with its dredging activity. The present DER permit application is for renewal of the 1980 Permit No. 16-21380 and is being processed under the DER File No. 161071139. This application for permit renewal was submitted on July 16, 1985. The application requests permission to maintenance dredge for a period of ten years. If granted, it is the intention of the applicant to use a closed clam shell bucket to excavate the material in the basin. This choice is in furtherance of the suggestion of DER and is a departure from the applicant's initial intention to use an open bucket to excavate. JSI also intends to employ turbidity curtains during the dredge activities. The applicant intends to transport the dredged material to the aforementioned EPA disposal site which is at sea. In doing so, a hopper barge is propelled by a towing vessel. Both the barge and towing vessel are inspected and certified by the United States Coast Guard. The crews involved in the transport of the material are qualified and licensed. In the past, transport of the material has been done under fair weather and smooth sea conditions, and it is intended that the transportation be done in that same setting if the permit is granted. The barge would not be loaded fully, thereby minimizing spillage. This was the arrangement in the past. The United States Coast Guard will be apprised of the departure time of the voyage in transport of the material, certain activities within that transport and upon return. The hopper barge has a bottom dump which is closed during transport and is opened at the bottom in disposing the dredge material. After satisfying DER about its proposal, JSI was informed that DER intended to grant the dredge permit requested. When Petitioner, George H. Hodges, Jr., the owner of real property adjacent to the site of the project, learned of the stated intention to grant the maintenance dredging permit, he offered a timely petition in opposition to the proposed agency action. This property of Petitioner is in Jacksonville, Duval County, Florida. It is located north of the JSI property at issue. Petitioner's real property is connected to the Intercoastal Waterway. Petitioner has filed this action in opposition to the grant of the permit upon the expressed belief that the dredging activity will cause pollution at his property. In particular, it is JSI's intention at various times in the calendar year to do maintenance dredging in the entire basin. In addition to using a closed clam shell bucket, a system of turbidity barriers or curtains will be employed in segmented dredge areas. Those several locations within the basin which are cordoned off with the turbidity curtains are as depicted in JSI's Exhibit 9 admitted into evidence. The design maintenance depths for the dredging project are set forth in JSI's Exhibit 4 admitted into evidence. They vary from -17 to -37.5 feet, with the greatest depth being contemplated under drydock number 1 in the northwestern corner of the basin. Near the Intercoastal Waterways the depth sought is -17 feet, transitioning to -21.5 feet moving toward the back of the basin at the western extreme and outside of the area dredged beneath drydock number 1. The depths sought under drydock numbers 2 and 3 are -26.5 feet and -20 feet respectively. These desired elevations correspond to conditions at mean low water. The tidal range in the Intercoastal Waterway adjacent to the basin, which would promote an influence in the basin proper, is in the neighborhood of 4-foot intervals, with two tidal cycles a day. This would mean, as example, that at the high tide range, the shallowest design depths for dredging of -17 feet become -21 feet in the transition from mean low water to mean high water. Those 4-foot variations would pertain to the other design depths contemplated in the dredging as described in the preceding paragraph as well. The turbidity barriers contemplated for use will extend from the surface through the water column to depths near the bottom. See JSI Exhibits 4 and 9. It is desirable, according to Dr. Gregory Powell, witness for JSI, a reliable expert in describing the effectiveness and use of turbidity curtains, to have those curtains extend to an area just above the bottom. Dr. Powell's education includes a Masters Degree in coastal and oceanographic engineering and a Ph.D. Degree in engineering mechanics, with emphasis on coastal and oceanographic engineering. In consideration of his remarks, under the influence of high tide there could be as much as a 4 foot gap between the curtain and the bottom. Powell and other experts who offered testimony agreed that turbidity screens can have effectiveness in areas of low current velocity, assuming the proper installation, maintenance and extension to a location near the bottom of the water body. If mismanaged, turbidity screens are not effective in controlling turbidity. Moreover, they are less effective in areas where significant current velocities are experienced. This would include the circumstance in which a foot and a half or more per second of flow was being experienced, according to Dr. Powell, whose opinion is accepted on this point. He also indicated that the quiescent areas in the basin, toward the back of the basin or western dimension of the basin, would show a flow regime in a rate of one centimeter per second. This expression is credited. Although, as described by Dr. Powell, the currents in the Intercoastal Waterway are moving at a rate approximating nine feet per second on ebb time at the bridge located on the Intercoastal Waterway to the south of the project site, these current velocities are not expected in the area where the dredging is occurring. Dr. Powell is correct in this assessment. As he describes, and in acceptance of that testimony, eddies from the current from the Intercoastal Waterway at peak flood tide could come into the basin and temporarily show velocities of one foot per second; however, these velocities are within the acceptable range of performance of the turbidity barrier. Dr. Powell's conclusion that wind would have no significant effect on the current velocity, given the depth of this basin, is also accepted. The remaining flow regime in the basin is not found to be a detriment to the function of the turbidity barriers. The use of turbidity curtains in this project is not found to be a "placebo" to placate DER as suggested by Erik J. Olson, engineering expert who testified in behalf of the Petitioner The monitoring that is intended in the course of the dredging activities would call for examination of background turbidity levels at three sites in the Intercoastal Waterway prior to commencing of dredging and twice daily at each of these sites during dredging. Should a violation of state water quality standards for turbidity be detected, dredging will cease until the problem with turbidity can be rectified. To provide ongoing assurances of compliance with water quality standards, JSI will analyze the sediment in the basin for the parameters of cadmium, copper, aluminum, lead, mercury, oil and grease every two years. Dr. Powell, expert in engineering and recognized as an expert in the matter of transport of the resuspended sediment associated with the dredging, as well as David Bickner, the project review specialist for DER, believe that the use of the closed clam shell bucket technique and employment of siltation screens or barriers, together with turbidity monitoring, will effectively protect against turbidity violations in the Intercoastal Waterway adjacent to the basin. This opinion is accepted. Bickner brings to his employment a Bachelor of Science degree in biology and a Master of Science degree in ecology. Bickner identified the principal concern of DER related to this project as the possibility of release of resuspended sediments into the Intercoastal Waterway. With the advent of the techniques described in the previous paragraph, only minimal changes in background conditions related to turbidity are expected. Although there would be turbidity violations within the confines of the areas where the dredging occurs, the principal influence of that turbidity will be confined in those regions. This speaks to dredge areas I, 2 and 3. According to Bickner, whose opinion is accepted, the turbidity changes within the dredge areas in relationship to background conditions do not require a mixing zone permit, nor do they constitute a basis for denial of the permit. As alluded to before, and as described by Dr. Powell, the basic nature of the basin in question is one of quiescent conditions with low current velocity. He points out that the layout of the basin is such that it is a sediment trap allowing the deposit of silt, in particular in the deeper sections of the basin near the western side. The greatest influence by resuspension of sediment in the dredging activities can be expected in the back portions of the basin and it is in this area that the silt barrier can be expected to be most efficient, based upon Powell's remarks. Dr. Powell indicated that there is the expectation of increased efficiency in turbidity control when a closed clam shell bucket is used, as opposed to the open style of clam shell bucket. Those efficiencies range from 30 to 70 per cent. There is some risk of increased turbidity near the bottom of the water column in the use of a closed clam shell bucket, and for that reason the applicant should monitor the activities of the operator of the excavation machinery to guard against inordinate disturbance of the area being excavated. On balance, the closed clam shell bucket is a superior technique to the open style of clam shell bucket excavation when those alternatives are compared. As Dr. Powell explained, the segmentation of the dredge area allows the resuspended sediment to be confined in more discrete circumstances and to be controlled. The location of the silt barriers behind the pier structure guard against the effects of eddying. The silt barriers can be properly anchored and will not be unduly influenced by current velocity. Dr. Powell believes that the use of silt barriers, taking into account a low velocity of current in the basin, and the proper deployment of the siltation screen could bring about a reduction of the resuspended solids by 80 to 90 per cent on the outside of the barrier. To calculate the influence or the environmental significance of that remaining 10 to 20 per cent of resuspended solids at the Intercoastal Waterway, Dr. Powell testified that the suspended load behind the silt curtain resulting from the dredging is expected to average from 100 milligrams per liter to a peak amount of 500 milligrams per liter. He believes that, depending on which methods of calculation is used, the dilution factor in the Intercoastal Waterway ranges from 330:1 to 600:1. In using an environmentally conservative assessment, that is 80 per cent effectiveness of the silt curtain with a 330:1 ratio, Powell calculated that the release of resuspended materials into the Intercoastal Waterway would be approximately .3 to 1.5 milligrams per liter. This translates to less than 1 NTU against background conditions. This result would not exceed the 29 NTU limit against background that is described as the standard for turbidity control. Dr. Powell's opinion of turbidity results based upon the dredge activity is accepted. There is exchange of water between the basin and the Intercoastal Waterway and to accommodate this influence, the turbidity curtains would be placed in such a fashion that they would not compete with the ebb and flow of the tide. Dr. Powell's assessment of the circumstance in describing the effectiveness of turbidity barriers takes into account the tidal conditions and the inappropriateness of trying to have the silt curtains prohibit the flow conditions during these tidal changes. In order to promote maximum effectiveness of the turbidity barriers during the entire course of excavation of materials, the length of, the silt screen must be adjusted as desired elevations are approached. Erik J. Olson is an expert in civil engineering with an emphasis on hydraulics and the holder of a Masters Degree in coastal and oceanographic engineering. As alluded to before, he questions the validity of the use of siltation barriers as an effective protection against the implications of turbidity. He properly points out that the curtains will not extend to the region of the interface of the basin and the water column at all times. He describes the exchange of water between the basin and the Intercoastal Waterway, to include the unrestricted sediment transport beneath the turbidity curtain. He believes that wind can cause changes in current velocity as great as .2 foot per second, activities within the basin an additional .3 foot per second, and eddying .3 foot per second. All of these taken together do not exceed the range of effective response of the turbidity barriers. On balance, Olson's criticism of the benefit of turbidity curtains is unconvincing. Arlynn Quinton White, Jr., who holds a Bachelor of Science Degree, a Master of Science Degree in biology and a Ph.D. in matters related to marine biology, offered his testimony in support of Petitioner. He believes that as much as 2 to 3 per cent of the resuspended sediment related to the dredging activities would reach the Intercoastal Waterway under the best of conditions. It is difficult to translate that testimony into a measurement of changes in turbidity levels against ambient conditions in the Intercoastal Waterway. In any event, as already indicated, the changes in turbidity levels are not expected to exceed 29 NTU against background. It is evident that the turbidity curtains are necessary and their proper use must be assured to protect against problems associated with turbidity and the implications of the constituents of the resuspended particulate matter related to possible toxicity. Therefore, the close monitoring suggested in the statement of intent to grant the dredge permit is viable. Another matter associated with the implications of turbidity pertains to the fact that when the dredge material has been resuspended, as much as two days could pass before the basin returns to background conditions, given the high content of silt with its attached metals. This becomes significant given the uncertainty of the location of the dredge equipment during the course of excavation, i.e., inside the barrier or outside the barrier. Final choice about the placement of the dredge equipment will have to be made at the time of the excavation. Should the dredge equipment be inside of the cordoned area while excavation is occurring, it would be necessary to allow turbidity conditions to achieve background levels before opening up the barrier for the exit of the hopper barge which contains the excavated material. Otherwise, the estimates as to the influence of the dredging activities in the Intercoastal Waterway are unduly optimistic. Likewise, if the excavation platform is placed outside of the work site, that is to say, on the outside of the siltation curtain, extreme caution must be used to avoid spillage of the excavated material when being loaded onto the hopper barge. The occasions in which the excavation is being made from this side of the barrier should be minimized. These safeguards are important because any changes in sediment loading within the Intercoastal Waterway promote an influence in the area immediately adjacent to the basin and other sites within the Intercoastal Waterway as well. The subject of the use of a hydraulic dredge as an alternative to excavation by use of a closed clam shell bucket was examined in remarks by the witnesses appearing at hearing. Olson believes that there are hydraulic dredges which can achieve the design depth contemplated by the project and which equipment could fit inside the basin area. This is contrary to the opinion of witnesses for the applicant and DER who do not believe that the hydraulic dredging equipment which would be necessary to achieve the design depths would fit into the basin area. On balance, the record does not establish that such equipment with the appropriate capability and size does exist. More importantly, the proposed method of excavation is environmentally acceptable when examined in the context of the permit sought in this case. Finally, it was not essential for the applicant to make a detailed investigation of availability of hydraulic dredging equipment and it is not determined that failure to make this investigation warrants the denial of the requested permit. Although an hydraulic dredge is more desirable from the standpoint that it causes less turbidity through resuspension of sediments, it is not the only plausible method of excavation in this instance. Raymond D. Schulze testified in behalf of JSI. He holds a Bachelor of Science Degree and a Master of Science Degree in environmental engineering sciences. In particular, he established the fact that the amount of resuspended solids that would be introduced into the Intercoastal Waterway associated with the dredging activity would not result in the smothering of organisms or to clogging of gills of fish. In addition to the possible problems with turbidity, there is the additional issue of violation of water quality standards in the several parameters associated with concentrations of metals in the water column within the basin and in the sediments or related parameters such as dissolved oxygen and biological integrity. Having considered the testimony, the facts do not point to water quality violations for any parameters occurring in the Intercoastal Waterway as a result of the dredging. To arrive at this factual impression, the testimony of Dr. Pollman and Schulze is relied upon. Water quality sampling done by JSI in locations within the basin and in the Intercoastal Waterway, that by Dr. Pollman and Schulze, supports their impression of the acceptability of the dredge activities. This water quality data was admitted as JSI's Exhibit 18. Additionally, the field conditions existing at the time of testing, to include water temperature, weather conditions, tidal cycle, ph and dissolved oxygen were also made known. This water quality data and other information examined by these witnesses points to the fact that no increases in concentrations of metals are occurring within the Intercoastal Waterway as a result of the business activities of the applicant, nor are they to be expected while dredging operations are under way. Dr. Pollman correctly identifies the fact that there will not be significant degradation of water quality, above DER's minimum standards, related to the Intercoastal Waterway based upon the dredging activities within the basin, dealing with the water quality parameters of mercury, zinc, cadmium, chromium, lead, aluminum, iron and copper, substances which are within the basin. Dr. Pollman also examined sediment data collected by DER, and that data tended to confirm his assessment of the influences of the dredging activity related to these parameters. Dr. Pollman does not believe that metal concentrations contained in the sediment of the basin are leaching into the water column in quantities sufficient to cause violation of water quality standards. His opinion is accepted. Pollman had collected water quality samples in the two locations where the greatest siltation rate was expected and as a consequence the greatest concentration of metals would be expected. The water quality samples were taken at several depths to reach an opinion as to the matter of leaching of metals into the water column and the possibility of those metals dissolving in the water column. If leaching had been occurring, a concentration of metals expressed as a gradient would be expected. The greatest concentration in this instance would be near the sediment interface with the water column. No such gradation was detected and the idea of leaching was ruled out. Bickner's testimony established that testing for the exact amount of iron present at the dredge site was not required, given the nature of the iron source being introduced into the water within the basin. Bickner did not find that type of iron to be toxic. As stated before, Pollman agrees that no violation of state water quality standards as a result of the presence of iron associated with the maintenance dredging should be expected. There is some data which shows water quality violation for mercury in the basin and the Intercoastal Waterway. Subsequent water samples collected by Schulze in the westerly portion of the basis did not show detectable levels of mercury. Moreover, data taken by Pollman and Schulze and compared with the DER sediment data shows that the concentration levels of mercury are greater in the Intercoastal Waterway than in the basin, thereby suggesting that there is no concentration gradient for mercury which would lead to the belief that the basin contributes to the amount of mercury found in the Intercoastal Waterway, nor is the mercury believed to be leaching into the water column in the basin. The explanation of the differences in measurements of the amount of mercury in the basin, depending upon the point in time at which analysis was made, may be attributable to a natural phenomenon, given numerous sources of mercury within the environment. Whatever the explanation of these changes, Dr. Pollman does not believe that the release of mercury associated with the resuspended sediments that may find their way into the Intercoastal Waterway would show a violation of the state water quality standard for mercury in that water body and his opinion is credited. Data collected by Pollman and Schulze did not show water quality violations for aluminum and the DER test data described before indicated aluminum levels lower in the basin than in the Intercoastal Waterway. Some data collected by Technical Services, Inc., an environmental consulting firm in Jacksonville, Florida, which was reviewed by Pollman, Schulze, and Bickner showed a substantial violation of the water quality standard related to aluminum in sediment sampling that was done. The origin of that amount of aluminum found on that occasion was not clear. It is possible, as described by Bickner, Pollman and Schulze, that the level detected In the Technical Service report could have occurred based upon natural phenomena such as storm water runoff from uplands. Bickner also questioned the findings of Technical Service and felt like the determination might be influenced by some intervening circumstance which would promote the need for re-analyzing that parameter. Whatever the explanation of the findings in the Technical Service report, it does not point to any water quality violation of the standard related to aluminum based upon the dredging activities, given the limited amount of total suspended solids that would be introduced into the Intercoastal Waterway. Schulze, in his assessment of the implications of metal concentrations in the sediment transported to the Intercoastal Waterway, did not find them to cause concern about toxicity to marine life in the Intercoastal Waterway. This point of view is accepted. In trying to understand the implications of metal concentrations, Schulze believed that the biologically available fractions of those metals in the sediment is not very high, and when the dilution of the sediments which occurs in these circumstances is examined, no toxicity is expected. Moreover, as Dr. Pollman described related to the parameter aluminum, it is not a toxic material at the ph levels found in the basin, and the resuspension during dredging will not cause it to gain toxicity. This opinion of Dr. Pollman is supported by Bickner and Schulze. The opinion of Dr. White that the amount of aluminum, copper and zinc within the sediment found in the basin would eventuate in the violation of water quality standards for those parameters when introduced into the Intercoastal Waterway is rejected. The information available to Pollman, Schulze and Bickner which describes their opinion about water quality standards was sufficient to reach an opinion, the position of Petitioner's witness Sanford Young, holder of a Bachelor of Science Degree in civil engineering and a Master of Science Degree in zoology notwithstanding. As Bickner indicated in his testimony, it is essential that an applicant give reasonable assurances of compliance with all parameters listed in Chapter 17-3, Florida Administrative Code, dealing with water quality. However, this does not mean that testing must be done for each parameter set forth in that chapter. Reasonable assurance has been given that water quality parameters as identified in that chapter will not be violated. Bickner indicates the biological integrity standard is not one of concern in that given the nature of business operations within the basin, there is no expectation of a stable benthic community which might be disturbed by dredging. From the remarks of Schulze, there is no prospect of danger to benthic communities within the Intercoastal Waterway. These impressions by Bickner and Schulze are accepted. Under the facts of the case, the failure of the DER permit appraisers to discover benthic organisms in the sample grabbed at the site is not unexpected. There is also some question about whether that sample is representative of the circumstance at the site, given the limited sampling. On the topic of normalization of the DER data which was described in the course of the hearing and is identified by Dr. Pollman, the value of that information is seen as establishing the relative quantities of certain metals within the basin as compared with other sites throughout the Intercoastal Waterway. Twenty-one different locations were involved in this analysis. Concentration ratios using aluminum to normalize the data are as reflected in JSI's Exhibit 17 admitted into evidence. The significance of this information as it grossly describes whether the basin routinely contributes to increases in the amounts of these metals within the Intercoastal Waterway. Overall, basin activities are not shown to have promoted such an outcome. This normalization comparison does not address the issue of site specific water quality violations; however, no such violations are expected associated with the dredging activities within the basin as it relates to violations in the adjacent Intercoastal Waterway. Schulze had made sampling related to dissolved oxygen within the basin and the Intercoastal Waterway. As Schulze describes, the levels of dissolved oxygen seem to be at their lowest point just prior to the dawn hours. Sampling which he did was done at 5:00 a.m. in order to obtain the lowest dissolved oxygen readings. Three sites were sampled within the basin and an additional site was sampled in the Intercoastal Waterway. Readings were taken at varying depths at each site to gain an impression of the overall water column. The mean reading for the circumstance was in excess of the required range for state water quality, that is 4.0 per million. Having considered the evidence, no problems with dissolved oxygen are expected in that deficit contribution is in the range of .1 milligram per liter, per Pollman. In addition, Dr. Powell, through modeling, examined the implications of long-term dredging activities on the topic of dissolved oxygen. He employed field data gathered by Schulze in this assessment. This modeling established that decreases in dissolved oxygen levels would range from .1 to .15 milligrams per liter. Given the average of 4.5 parts per million oxygen in the basin at present, the incremental decreases in dissolved oxygen levels related to the dredging would not pose a problems with state water quality standards for dissolved oxygen other than short-term effects in the immediate vicinity of the dredge area, which is an acceptable deviation. As the Petitioner urges in its fact proposal, a 1983 report of Technical Services, Inc., JSI Exhibit 4, and a 1985 report of that firm, JSI Exhibit 7, were made available as part of the application. Officials within Technical Services, Inc. did not appear at the hearing and offer testimony related to the specific findings found in those reports. This information was used by the experts who did testify on behalf of the applicant, in particular Dr. Pollman, as data to question, his assumptions made about the implications of the project in terms of water quality concerns. Pollman also utilized DER data taken from a source known as Storette, and this pertains to the 21 sampling stations involved in the preparation of JSI Exhibit 17, the graphing document related to concentrations of various metals. Again, this was in furtherance of the basic underlying opinion which Pollman had about the project. The Storette data as such was not offered into evidence. Witnesses for the Petitioner, namely Olson and White, were aware of the two reports of Technical Services, Inc. and the use of the DER Storette data and offered their criticism of the project taking into account this information. Petitioner points out that there is no indication as to how far below the sediment/water interface the Technical Services, Inc., and DER sediment samples related to reports of the consultant and the Storette information of DER were extracted. Therefore, it only reflected one portion of the sediment at a depth of extraction. A more complete understanding of the sediment characteristics would have been shown through a core sample, especially in the area to be dredged, but that understanding was not essential. The suggestion by the Petitioner that it was inappropriate to normalize data for purposes of describing the relative concentrations of the metals parameters is not accepted. The preparation of JSI's Exhibit 17 does not point to abnormally high amounts of aluminum, such that the use of aluminum as a known commodity in carrying out the normalization would be contraindicated. As identified by the petitioner in its proposal, sediment sizes within the strata found in the basin depicts higher percentage of silt and clay-size sediments in the back end of the basin with lesser amounts of the silt- and clay-size sediments in the southern reach of the basin and at the intersection of the basin with the Intercoastal Waterway. The smaller the particles, such as silt and clay, will remain suspended for a longer period of time and have a tendency to promote bonding with heavy metal. Nonetheless, this information does not change the impression that the turbidity barriers will be effective. The 1983 Technical Services, Inc., information related to the settling of resuspended sediment and similar information imparted in the 1985 report by that organization tend to confirm that approximately two days should be necessary to allow the area of excavation to return to background conditions related to turbidity. This is in corroboration of remarks by Dr. Powell. These time projections are not found to be inadequate when taking into account other factors such as tidal changes, boat traffic, other activities within the basin, wind and weather events. As White described, the antifouling properties of the paint involved in the business activity of the applicant can be expected to adversely impact any larval forms of marine organisms when introduced into the basin. Nonetheless, this toxicity is not expected to pose a danger to marine organisms in the Intercoastal Waterway given the percentage of resuspended sediment that will escape capture by the sediment barriers and the dilution factor before introduction of those resuspended sediments into the Intercoastal Waterway. Petitioner questions the acceptability of evidence of the findings set forth by E G & G Bionomics, a firm which performed an examination to determine existing diversity of benthic macroinvertebrates. Those results are reported in Petitioner's Exhibit 13, a 1980 report. They were not accepted as evidence of the specific findings within that report in that they were not the subject of discussion by persons who authored that report. The use was limited to corroboration of the opinion by Dr. Pollman and Schulze as to water quality considerations and they were not Crucial to their opinions. Moreover, it was not necessary for the applicant to perform a more recent bioassay in order to give reasonable assurance to DER concerning water quality matters or to establish the implications of the influence of contaminants within the sediment found in the basin related to benthic macroinvertebrates. The biological integrity of the basin area was at risk prior to the proposal for maintenance dredging. The relevant inquiry is the influence of the dredging activities on the biological integrity in the Intercoastal Waterway and those activities do not place organisms within the Intercoastal Waterway in peril. Any synergistic aspects of metals which act as toxins, for example, the increase in the aggregate value of the toxicity of zinc and cadmium, compared to their individual implications as toxins, will not present problems with water quality in the Intercoastal Waterway. Petitioner takes issue with the proposed disposition of the dredge material at an ocean site. While an appropriate upland disposal site would be preferred, it is not mandated. The approved EPA disposal site within federal jurisdiction is acceptable. Petitioner in its fact proposals found at paragraphs 36-39 (incorporated by this reference) points out violations of water quality standards for cadmium, mercury, and aluminum, and other possible violations of the standard for mercury. This information does not cause a change of opinion about the acceptability of the project in terms of reasonable assurances. There is no indication that oils and greases will present a problem related to water quality standards. The project is not contrary to public interest in that: (a) the project will not adversely affect the public health, safety, welfare or the property of others; (b) the project will not adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitat; (c) the project will not adversely affect navigation or the flow of water or cause harmful erosion of shoaling; (d) the project will not adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; (e) the project will be of a temporary nature; (f) the project will not adversely affect significant historical and archaeological resources under the provisions of s. 267.061; (g) the project is in no other way contrary to the public interest. The purpose of this fact finding does not include the issue of whether there are ongoing violations of state water quality standards associated with the business activity of the applicant, that not being the subject of the hearing. In any event, the testimony of Dr. Pollman established that the operations of JSI are not causing water quality problems associated with the parameters of cadmium, copper, aluminum, mercury, lead, chromium, tin, zinc or iron related to the Intercoastal Waterway. The influences of the business activities associated with those parameters within the basin are not understood when the evidence presented is examined but are not found to be essential to the resolution of this dispute.

Recommendation Having considered the facts, and the conclusions of law, it is, RECOMMENDED: That DER issue a final order which grants the requested maintenance dredging permit in keeping with the safeguards described in the fact finding of this recommended order. DONE AND ORDERED this 16th day of October 1986 at Tallahassee, Florida. CHARLES C. ADAMS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of October 1986. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 86-0365 Having examined the proposed facts submitted by the parties, those proposals have been found as fact with the exception of the following which are distinguished: Petitioner's facts Paragraph 1: Subordinate to fact finding. Paragraph 2: The first sentence in this paragraph is rejected because the fact is not found within the indicated exhibits, nor can that fact be fairly inferred. Paragraphs 9, 10, 11, 14, and 15: Except for the last sentence in that latter paragraph are subordinate to facts found. Paragraph 15: The last sentence: Contrary to facts found. Paragraph 18: The last sentence: Subordinate to fact finding. Paragraphs 21, 22, 23, 24, 25 and 26: Subordinate to fact finding. Paragraph 27: Contrary to facts found. Paragraphs 28, 29, 30 and 31: Subordinate to fact finding. Paragraph 32: Not necessary to dispute resolution. Paragraphs 33 and 34: Subordinate to fact finding. Paragraph 35: Contrary to facts found. Paragraphs 40, 41 and 42: Subordinate to fact finding. Paragraphs 44, 45: Not necessary to dispute resolution. Paragraph 47: The first two sentences are information that is not sufficiently credible to allow application to the issues of the present case. Paragraphs 48, 49, 50 and 51: Not necessary to dispute resolution. Paragraph 52: Reject as fact. Paragraph 54: Contrary to facts found. Paragraph 55: Not necessary to dispute resolution. JSI and DER facts Paragraph 2: Pertaining to sentence 8 and the last phrase within sentence 11; Not necessary to dispute resolution. Paragraph 3: As to the first sentence, fourth sentence and seventh sentence; Not necessary to fact resolution. Paragraphs 4, 5 and 6 to the colon in paragraph 6: Not necessary to dispute resolution. The remaining portions of paragraph 6 are subordinate to fact finding. Paragraph 10: as to the last two sentences; Not necessary to dispute resolution. Paragraph 13: As to the next to the last sentence; Not necessary to dispute resolution. Paragraph 14: As to the fourth sentence and the last sentence; Not necessary to dispute resolution. Paragraphs 16, 17, 18 and 20: Subordinate to fact finding. Paragraph 21: Sentence 3 is subordinate to fact finding sentence 4 is not necessary to dispute resolution; sentences 5 and 6 are subordinate to fact finding. Paragraph 22: Next to the last sentence; Not necessary to dispute resolution. Paragraphs 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 38 and 41: Subordinate to fact finding, except the comments in the last sentence of paragraph 41 related to the operations of JSI causing or contributing elevated concentrations of parameters within the basin which is not found as fact. Paragraphs 42, 43 and 44: Subordinate to fact finding. COPIES FURNISHED: Kenneth G. Oertel, Esquire Chris Bryant, Esquire OERTEL AND HOFFMAN, P.A. Post Office Box 6507 Tallahassee, Florida 32314-6507 Thomas M. Baumer, Esquire Deborah Barton, Esq. GALLAGHER, BAUMER, MIKALS, BRADFORD, CANNON AND WALTER, P.A. 252-5 Independent Square Jacksonville, Florida 32202 Bradford L. Thomas, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57267.061403.03190.704
# 7
WIREGRASS RANCH, INC. vs SADDLEBROOK RESORT, INC., AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 91-003658 (1991)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Jun. 12, 1991 Number: 91-003658 Latest Update: Oct. 29, 1993

Findings Of Fact The Parties and the Property. The Respondent, Saddlebrook Resorts, Inc. (Saddlebrook), is a corporation organized and existing under the laws of Florida, and is wholly owned by the Dempsey family. Saddlebrook is located on approximately 480 acres in central Pasco County, east of I-75 and south of State Road 54. The Petitioner, Wiregrass Ranch, Inc. (Wiregrass) is a corporation organized and existing under the laws of Florida, and is wholly owned by the Porter family ("the Porters"). Wiregrass owns approximately 5,000 acres of property which extends from Saddlebrook west approximately one mile to State Road 581 and south for approximately four miles. The Respondent, the Southwest Florida Water Management District (SWFWMD), is a political subdivision created pursuant to Chapter 61-691, Laws of Florida, which exists and operates under the Water Resources Act, Fla. Stat., Ch. 373. SWFWMD is charged with regulating, among other things, surface water management systems in Pasco County. Saddlebrook discharges surface water onto Wiregrass at two locations on the southern and western boundaries of Saddlebrook, known as the south outfall and the west outfall. Saddlebrook's property is part of a drainage basin totalling approximately 1400 acres that contributes runoff to Wiregrass' property. Until approximately 1973, the Saddlebrook property was undeveloped and owned by the Porters. In approximately 1973, the Porters sold the Saddlebrook property to the Refram family, which began developing the property. In approximately 1979, Saddlebrook acquired the property from the Reframs. The Saddlebrook property includes residential development, a conference center, and golf course and tennis facilities. Wiregrass' property, which is largely undeveloped and used for ranching, consists of pine-palmetto flatwoods, wetland strands, isolated wetlands, and improved pastures. The Porters' Civil Action Against Saddlebrook. The Porters instituted a civil action against Saddlebrook, Porter, et al. v. Saddlebrook Resorts, Inc., Case No. CA 83-1860, in the Circuit Court of the Sixth Judicial District, Pasco County, complaining that post-development discharges from Saddlebrook exceed pre-development discharges. In the civil litigation, the Porters contended that Saddlebrook's peak flow discharges should be returned to pre-development, or 1973, levels. A primary purpose of Saddlebrook's proposed redesign is to return peak flow discharges to those levels that existed in 1973, in response to the Porters' complaints in the civil action. Saddlebrook's current surface water management system is deemed by SWFWMD to be in compliance with Rule 40D-4, and SWFWMD's regulations do not require redesign or modification of the current system. Prior to Saddlebrook's submission of its application, SWFWMD advised Saddlebrook that, because Rule 40D-4 became effective on October 1, 1984, SWFWMD considered that date to be the "pre-development" condition for purposes of evaluating Saddlebrook's discharges. Saddlebrook requested that SWFWMD evaluate its application using 1973 as the pre-development condition. SWFWMD advised Saddlebrook that it would apply 1973 as the pre-development condition if the Porters consented. By letter from the Porters' counsel to SWFWMD dated January 31, 1990, the Porters provided their express consent to SWFWMD's use of 1973 as the pre- development date for purposes of evaluating those discharges relevant to Saddlebrook's MSSW permit application. Saddlebrook's MSSW Permit Application. On or about February 8, 1990, Saddlebrook submitted its application for MSSW permit no. 497318.00, seeking SWFWMD's conceptual approval of the redesign of Saddlebrook's surface water management system. The proposed redesign calls for modification of most of the existing drainage control structures at Saddlebrook and installation of new control structures at several locations, including the south and west outfalls. After submission of its initial application, Saddlebrook made various subsequent submittals in response to SWFWMD requests for additional information. Saddlebrook's response to SWFWMD's requests culminated in final submittals on March 7, 1991 and April 5, 1991. In its various submittals, Saddlebrook provided, among other things, detailed descriptions of all proposed modifications to its drainage system, engineering reports, and computerized flood-routing analyses of runoff from Saddlebrook under pre-development (1973) and post-modification conditions. Saddlebrook provided all information requested, and SWFWMD thereafter deemed its application complete. SWFWMD's Review of Saddlebrook's Application. In the fifteen months following Saddlwbrook's initial February, 1990, submittal, SWFWMD conducted an intensive review of the application. During the course of this review, SWFWMD staff performed numerous field inspections, made an independent determination of all input data to the computer analyses of Saddlebrook's discharges, and made six separate formal requests for additional information. SWFWMD's requests for additional information required, among other things, that Saddlebrook modify various input data and rerun its computer analyses of discharges under the pre-development and post-modification conditions. In addition, SWFWMD required Saddlebrook to perform computer modelling analyses of discharges from Wiregrass' property onto the property of downstream landowners. Because, unlike the Porters, these downstream owners had not provided consent to use 1973 as the relevant pre-development date, SWFWMD required Saddlebrook to model this downstream discharge using a "pre- development" date of 1984. SWFWMD performed its standard review procedures in connection with Saddlebrooks' application. In addition, SWFWMD also performed its own computer-modelling analyses of Saddlebrook's discharges. This modelling was based on input data independently collected by SWFWMD staff in the field and from other sources. SWFWMD staff also met with the Porters' hydrologist, Dr. Gerald Seaburn, and thoroughly reviewed concerns he expressed in connection with Saddlebrook's application. In addressing these concerns, SWFWMD performed additional work, including conferring with an independent soils expert, performing additional field inspections, and modifying the SWFWMD computer modelling analyses based on alternative input parameters suggested by Dr. Seaburn. In reviewing Saddlebrook's application, SWFWMD applied the design and performance criteria set forth in its "Basis of Review for Surface Water Management Permit Applications" ("Basis of Review"), which is incorporated by reference in F.A.C. Rule Chapter 40D-4. Based upon its review of Saddlebrook's application, SWFWMD concluded that Saddlebrook had demonstrated compliance with the design and performance criteria set forth in SWFWMD's Basis of Review and the conditions for permit issuance under F.A.C. Rule 40D-4.301. By a Staff Report dated April 29, 1991, and Notice of Proposed Agency Action dated May 3, 1991, SWFWMD recommended approval of Saddlebrook's application. Compliance With SWFWMD Permitting Criteria. The design and performance criteria for MSSW permitting set forth in SWFWMD's Basis of Review fall into four categories: (1) water quantity, in terms of peak flow discharges for projects, like Saddlebrook's, located in open drainage basins; (2) flood protection; (3) water quality; and (4) wetlands impacts. Water Quantity. Under the Basis of Review's water quantity standards, SWFWMD requires that projected peak flow discharges during a 25-year, 24-hour storm event under the proposed system be reasonably similar to peak flow discharges under the pre- development condition. The evidence presented at the formal hearing demonstrated that Saddlebrook's application satisfies SWFWMD's water-quantity standards. This evidence demonstrated that peak flow discharges during a 25-year, 24-hour storm event under the proposed system will be less than, but reasonably similar to, pre-development (1973) peak flow discharges. The evidence presented at the formal hearing also demonstrated that, under the proposed system, peak flow discharges during a 25-year, 24-hour storm event from Wiregrass' property onto downstream landowners will be less than, but reasonably similar to, 1984 peak flow discharges. The evidence presented by Saddlebrook further demonstrated that storage will be increased under the proposed redesign versus the pre- development, 1973 condition. On Saddlebrook's property, there will be approximately 35 percent more storage than existed in 1973, and the total storage for Saddlebrook and the contributing drainage basin upstream of Saddlebrook will be increased by approximately 15 percent over that existing in 1973. Flood Protection. Under the flood-protection standards of the Basis of Review, SWFWMD requires that the applicant demonstrate that under the proposed condition the lower floor of all residential and other buildings on-site, and in areas affected by the site, will be above the 100-year flood elevation. SWFWMD also requires that there be no net encroachment into the flood plain, up to that encompassed by the 100-year event, which will adversely affect conveyance, storage, water quality or adjacent lands. The evidence presented at the formal hearing demonstrated that Saddlebrook's application satisfies SWFWMD's flood-protection standards. The testimony of Mr. Fuxan and Wiregrass' related exhibit, Ranch Ex. 35, purporting to show that in a 25-year, 24-hour storm Saddlebrook's proposed redesign will "flood the [Saddlebrook perimeter] roads and just sheet flow onto the Porter property" is not accurate. As part of its redesign, Saddlebrook will construct an additional berm along the southwestern and southern perimeters of its property. This berm will detain water on Saddlebrook's property during a 25-year, 24-hour storm event and prevent it from "sheet-flowing" onto the Wiregrass property. Water Quality. Under the water-quality standards of the Basis of Review, SWFWMD requires, for systems like Saddlebrook's involving wet detention and isolated wetlands, that the applicant provide sufficient storage to treat one inch of runoff from the basins contributing runoff to the site. This volume must be discharged in no less than 120 hours, with no more than one-half of the volume being discharged within the first 60 hours. The evidence presented at the formal hearing demonstrated that Saddlebrook's application satisfies SWFWMD's water-quality standards. Wetland Impacts. Under the wetland-impacts standards of the Basis of Review, SWFWMD requires that the applicant provide reasonable assurance that the proposed system will not adversely impact on-site and downstream wetlands. The evidence presented at the formal hearing demonstrated that Saddlebrook has provided reasonable assurance that the proposed redesign will cause no adverse impacts to on-site wetlands. Saddlebrook's proposed redesign will impact only approximately .167 acres of on-site wetlands, for which Saddlebrook will fully mitigate by creating .174 acres of forested wetlands and buffer area. The evidence presented at the formal hearing also demonstrated that Saddlebrook has provided reasonable assurance that the proposed redesign will cause no adverse impacts to off-site wetlands. Reasonable assurance that off- site wetlands will not be adversely impacted was demonstrated by, among other things, evidence establishing that: (1) discharge points will not change under the proposed condition; (2) discharge elevations will be reasonably similar under the proposed condition; (3) there will be no significant variation in the water fluctuations in the wetlands adjacent to the south and west outfalls as a result of the proposed condition; (4) the drainage basin areas will be reasonably similar under the proposed condition; and (5) the proposed redesign will satisfy SWFWMD's water quality requirements. Wiregrass' Petition. In its Petition for Formal Administrative Hearing, Wiregrass focused primarily on water quality issues and stormwater runoff rates (or peak flow discharges), alleging the following "ultimate facts" which it claimed "entitle [it] to relief": The application, as submitted, contains insufficient storage to meet water quality criteria. The application, as submitted, will result in storage volumes on the project site which will not be recovered within 72 hours [sic] as required by the DISTRICT criteria. The application, as submitted, contains calculations based on erroneous hydraulic gradients. The application, as submitted, will result in storage volumes insufficient to meet water quality criteria as required by DISTRICT criteria. Post development stormwater runoff rates are underestimated in the application, resulting in system design with insufficient retention storage capacity to meet the DISTRICT's water quantity criteria. The failure to store stormwater or irrigation runoff impacts the substantial interest of the RANCH in that it deprives it of groundwater resources necessary for the successful operation of the ranch. Further, the lack of storage of stormwater and irrigation water is a prohibited waste of the water resources. At the formal hearing, Wiregrass presented no evidence to support any of the foregoing allegations of its Petition. Objections Raised by Wiregrass At The Hearing. At the final hearing, Wiregrass' opposition to Saddlebrook's permit application focused on three different grounds: For purposes of evaluating peak flow discharges, SWFWMD does not have jurisdiction to use a pre-development date prior to October 1, 1984. Under F.A.C. Rule 40D-4.301(1)(i), which provides that an applicant must give reasonable assurance that the surface water management systems "is consistent with the requirements of other public agencies," SWFWMD must apply not only its own permitting criteria but also those of other governmental entities, including county planning ordinan Under F.A.C. Rule 40D-4.301(1)(b), which provides that a permit application must give reasonable assurances that the surface water management system "will not cause adverse water . . . quantity impacts", SWFWMD must consider whether the annual volume of runoff will increase as a result of the proposed surface water management system. None of the foregoing objections was raised in Wiregrass' Petition as a basis for denying Saddlebrook's application. (Annual volume was alluded to in the Petition only as being pertinent to the question of Wiregrass' "substantial interest" for purposes of standing.) In any event, for the reasons set forth below, each of these objections was refuted by the evidence presented at the formal hearing. The 1973 Pre-Development Date. In their civil action against Saddlebrook, the Porters took the position that Saddlebrook's surface water management system should be redesigned so that discharges approximate those levels existing in 1973, before development of the Saddlebrook property. Dr. Gerald Seaburn, a hydrologist retained by the Porters, testified in the civil action that 1973 is the appropriate pre-development date for purposes of evaluating Saddlebrook's peak flow discharges. David Fuxan, a civil engineer retained by the Porters, took the position in the civil action that Saddlebrook should modify its surface water management system so as to return peak flow discharges to 1973 levels. At the formal hearing in this proceeding, Mr. Fuxan testified that it is still his position that Saddlebrook should modify its surface water management system so as to return peak flow discharges to 1973 levels. By letter from the Porters' counsel to SWFWMD dated January 31, 1990, the Porters provided their express consent to SWFWMD's use of 1973 as the pre- development date for evaluating those discharges relevant to Saddlebrook's MSSW permit application. Use of a 1984 "pre-development" date would prevent Saddlebrook from making the modifications the Porters claim in the civil litigation that it must make. Saddlebrook's existing system, about which the Porters complain in the civil litigation, is in all material respects the same system that was in place on October 1, 1984. Use of this existing system as the benchmark of comparison for attenuation of peak flows, therefore, would mean that substantial modifications to the existing system could not be made without substantially increasing retention storage on Saddlebrook. Substantially increasing retention storage on Saddlebrook is not possible due to the high water table and proximity of the lower aquifer. See Finding of Fact 70, below. In addition, a primary claim of the Porters in the civil action is that duration of flow under Saddlebrook's existing system exceeds 1973 levels and has resulted in expanded wetlands on the Porter property. But duration of flow and peak flow discharges are inversely related: duration of flow can be decreased only if peak flow discharges are increased. Accordingly, the only way that Saddlebrook can reduce the duration of flow onto Wiregrass to 1973 levels, as the Porters have demanded, other than increasing retention storage on Saddlebrook, is to return peak flow discharges to 1973 levels. Other Governmental Agencies' Requirements. F.A.C. Rule 40D-4.301(1)(i) provides that a permit applicant must give reasonable assurance that the surface water management system "is consistent with the requirements of other public agencies." SWFWMD has consistently interpreted this provision to be "advisory", i.e., to apprise applicants that they must also comply with other applicable laws and that issuance of an MSSW permit by the District does not relieve them of the responsibility to obtain all necessary local and other permits. SWFWMD's long-standing and consistently-applied interpretation and practice is not to require applicants to prove compliance with the regulations of other govermental agencies in order to obtain an MSSW permit. There are two primary reasons for this interpretation and practice. First, the Southwest Florida Water Management District includes 16 counties and 96 municipalities. In addition, other state and various federal agencies have jurisdiction within its territory. It is impracticable for SWFWMD to become familiar with, and to apply, the permitting and other regulations of more than 100 other agencies. Second, SWFWMD has concluded that, under Part 4 of Secton 373 of the Flordia Statutes, it does not have authority to deny a permit application based on its interpretation of another governmental agency's regulations. In any event, the evidence demonstrates that Saddlebrook has provided reasonable assurance that the proposed redesign will be "consistent with the requirements of other public agencies" as provided in F.A.C. Rule 40D- 4.301(1)(i). Limiting Condition No. 3 of the proposed permit requires that Saddlebrook must comply with Pasco County and other local requirements: The Permittee shall comply with all applicable local subdivision regulations and other local requirements. In addition the permittee shall obtain all necessary Federal, State, local and special district authorizations prior to the start of any construction or alteration of works authorized by this permit. In addition, Standard Condition No.3 ensures that SWFWMD approval will not supersede any separate permitting or other requirements imposed by Pasco County: The issuance of this permit does not . . . authorize any . . . infringement of federal, state or local laws or regulations. (Emphasis added.) Finally, the Pasco County ordinance upon which Wiregrass relies imposes requirements that are in substance identical to SWFWMD's with respect to MSSW permit applications. Saddlebrook's compliance with SWFWMD's regulations likewise would satisfy the substance of the requirements of the county ordinance. Annual Volume of Runoff. F.A.C. Rule 40D-4 (incorporating the Basis of Review) does not address, and SWFWMD does not regulate, the annual volume of runoff in open drainage basins. If annual volume of runoff is relevant under Rule 40D-4.301, as Wiregrass contends, that rule requires only that the applicant provide reasonable assurance that "the surface water management system" will not cause adverse quantity impacts. Saddlebrook's existing surface water management system has not caused a significant increase in the annual volume of runoff onto Wiregrass' property. The increase in the annual volume of runoff from Saddlebrook that has occurred over the pre-development 1973 condition has resulted from the urbanization of Saddlebrook's property. The increase in the annual volume of runoff from Saddlebrook over that existing prior to development (1973) is approximately 3.4 inches. This increase is only a small fraction of the natural year-to-year variation in runoff resulting from differences in rainfall alone. Rainfall can vary up to 30 inches on an annual basis, from 40 to 70 inches per year. The resulting year-to-year variations in runoff can total as much as 20 inches. The approximately 3.4 inches increase in the annual volume of runoff from Saddlebrook due to urbanization has caused no adverse impact to Wiregrass. The natural drainage system on the Wiregrass property has in the past and throughout its history received and handled increases in the annual volume of runoff of up to 20 inches due to rainfall differences. Such increases simply flow through Wiregrass' property. Of the approximately 3.4 inch increase in annual runoff due to urbanization, only approximately one-third of an inch is due to the filling in of bayheads by Saddlebrook's prior owner. This increase is insignificant and has not caused a substantial adverse impact to Wiregrass. Any reduction of storage resulting from the filling of bayheads will be more than compensated for under the proposed redesign. Storage on Saddlebrook's property will be increased by approximately 35 percent under the proposed condition over that existing in 1973, before the bayheads were filled. In open drainage basins, like Saddlebrook's, downstream flooding is a function of the rate of peak flow of discharge, not the annual volume of runoff. This is one of the reasons why, in the case of open drainage basins, SWFWMD regulates peak flow discharges and not the annual volume of runoff. Because Saddlebrook's proposed redesign will attenuate peak flow discharges to those levels that existed in the pre-devlopment 1973 condition, Saddlebrook has provided reasonable assurance that there will not be increased flooding on Wiregrass' property in the future. The evidence does not establish that Wiregrass has suffered, or will suffer, any adverse impact due to an increase in the annual volume of runoff from Saddlebrook as a result of the design, or redesign, of the system, or as a result of urbanization, or otherwise. It is not possible to design a surface water management system at Saddlebrook that would reduce the annual volume of runoff. Such a system, which involves the percolation of surface water from retention ponds into a deeper, aquifer system, requires a deep water table. At Saddlebrook, the water table is near the ground surface. As a result, it is not possible to store a significant quantity of water in retention ponds between storm events. In addition, the water levels in the deeper and the shallower aquifer systems at Saddlebrook are approximately the same and, therefore, there is insufficient hydraulic pressure to push the water through the confining layer between the two systems and into the deeper aquifer system.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Southwest Florida Water Management District enter a final order granting Saddlebrook's application for surface water management permit no. 497318.00, subject to the terms and conditions in the SWFWMD Staff Report. RECOMMENDED this 31st day of March, 1992, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of March, 1992. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-3658 To comply with the requirements of Section 120.59(2), Fla. Stat. (1991), the following rulings are made on the parties' proposed findings of fact: Petitioner's Proposed Findings of Fact. 1.-4. Accepted and incorporated. Rejected as not proven and contrary to the greater weight of the evidence. Accepted and incorporated to the extent not subordinate or unnecessary. 7.-9. Rejected as not proven and contrary to the greater weight of the evidence. First sentence, accepted. Second sentence, rejected as not proven and contrary to the greater weight of the evidence. Accepted but not necessary. 12.-13. Rejected as not proven and contrary to the greater weight of the evidence. Accepted but not necessary. The extent of the wetland expansion is rejected as not proven and contrary to the greater weight of the evidence. The rest is accepted. However, the increased volume is due in large part to urbanization, not to the surface water management system. It also is due in part to alterations to the property done by the Porters. Accepted but subordinate and unnecessary. Accepted. However, this would occur only during a 25-year, 24-hour storm event, and there was no evidence that one has occurred or, if it has, whether Mr. Porter was there to observe it. 18.-20. Accepted but subordinate and unnecessary. Characterization "much of" is rejected as not proven and contrary to the greater weight of the evidence. Otherwise, accepted but subordinate and unnecessary. Accepted and incorporated. Rejected as not proven and contrary to the greater weight of the evidence. Rejected as not proven and contrary to the greater weight of the evidence. Rejected as not proven and contrary to the greater weight of the evidence that lichen lines, by themselves, are ordinarily are sufficient to set jurisdictional lines. 26.-29. Rejected as not proven and contrary to the greater weight of the evidence. Even if it were proven that the wetlands had expanded, it was not proven, and is contrary to the greater weight of the evidence, that Saddlebrook (and, especially, Saddlebrook's surface water management system) caused the expansion. First sentence, accepted but cumulative. The rest is rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary. In any event, both factors are undeniably significant. 32.-34. Rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary. Rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary. Rejected as not proven and contrary to the greater weight of the evidence. 39.-41. Rejected as not proven and contrary to the greater weight of the evidence that SWFWMD does not apply it. The evidence was that SWFWMD interprets it differently than Wiregrass proposes and applies its own interpretation. Under the SWFWMD interpretation, the permit conditions requiring compliance with other legal requirements constitute the necessary "reasonable assurance." In addition, SWFWMD's review and evaluation is not complete until this formal administrative proceeding is completed, and the Pasco County ordinance has been considered as part of this proceeding. Rejected as not proven and contrary to the greater weight of the evidence. Again, SWFWMD's review and evaluation is not complete until this formal administrative proceeding is completed, and annual volume has been considered as part of this proceeding. That consideration has affirmed SWFWMD's position that, at least in this case, the proposed stormwater management system does not cause an increase in annual volume that would result in denial of the application. Accepted but subordinate and unnecessary. Rejected as not proven and contrary to the greater weight of the evidence. First sentence, accepted (although the characterization "far exceed" is imprecise) and incorporated. Second sentence, rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary that no "stipulation" was entered into. But the evidence is clear that Wiregrass, Saddlebrook and SWFWMD all agreed to the use of 1973 as the point of comparison for peak flow discharges. Rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary. Respondents' Proposed Findings of Fact. The proposed findings of fact contained in the Proposed Recommended Order of Respondents Saddlebrook Resorts, Inc., and Southwest Florida Water Management District are accepted and incorporated to the extent not subordinate or unnecessary. COPIES FURNISHED: Douglas P. Manson, Esquire Foley & Lardner 101 East Kennedy Boulevard Suite 3650 Tampa, Florida 33602 Stephen R. Patton, Esquire Jeffrey A. Hall, Esquire Kirkland & Ellis East Randolph Drive Chicago, Illinois 60601 Enola T. Brown, Esquire Lawson, McWhirter, Grandoff & Reeves East Kennedy Boulevard Suite 800 Post Office Box 3350 Tampa, Florida 33601-3350 Mark F. Lapp, Esquire Edward Helvenston, Esquire Assistant General Counsel Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899 Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (2) 120.57373.413 Florida Administrative Code (5) 40D-4.02140D-4.04140D-4.05440D-4.09140D-4.301
# 8
OLD FLORIDA PLANTATION, LTD. vs POLK COUNTY BOARD OF COUNTY COMMISSIONERS AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 00-004928 (2000)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Dec. 07, 2000 Number: 00-004928 Latest Update: Nov. 05, 2001

The Issue The issue in this matter is whether Respondent, Polk County Board of Commissioners (Polk County or County) has provided Respondent, Southwest Florida Water Management District (SWFWMD), with reasonable assurances that the activities Polk County proposed to conduct pursuant to Standard General Environmental Resource Permit (ERP) No. 4419803.000 (the Permit) meet the conditions for issuance of permits established in Rules 40D-4.301, and 40D-40.302, Florida Administrative Code. (All rule citations are to the current Florida Administrative Code.)

Findings Of Fact Events Preceding Submittal of ERP Application The Eagle-Millsite-Hancock drainage system dates back to at least the 1920's, and has been altered and modified over time, especially as a result of phosphate mining activities which occurred on OFP property in the 1950's-1960's. The system is on private property and is not owned and was not constructed by the County. Prior to 1996, the Eagle-Millsite-Hancock drainage system was in extremely poor repair and not well- maintained. The Eagle-Millsite-Hancock drainage system originates at Eagle Lake, which is an approximately 641-acre natural lake, and discharges through a ditch drainage system to Lake Millsite, which is an approximately 130-acre natural lake. Lake Millsite drains through a series of ditches, wetlands, and ponds and flows through OFP property through a series of reclaimed phosphate pits, ditches and wetlands and ultimately flows into Lake Hancock, which is an approximately 4500-acre lake that forms part of the headwaters for the Peace River. The drainage route is approximately 0.5 to 1 mile in overall length. The Eagle-Millsite-Hancock drainage system is one of eight regional systems in the County for which the County and SWFWMD have agreed to share certain funding responsibilities pursuant to a 1996 letter agreement. To implement improvements to these drainage systems, Polk County would be required to comply with all permitting requirements of SWFWMD. During the winter of 1997-1998, Polk County experienced extremely heavy rainfall, over 39 inches, as a result of El Nino weather conditions. This unprecedented rainfall was preceded by high rainfalls during the 1995-1996 rainy season which saturated surface waters and groundwater levels. During 1998, Polk County declared a state of emergency and was declared a federal disaster area qualifying for FEMA assistance. Along the Lake Eagle and Millsite Lake drainage areas, septic tanks were malfunctioning, wells were inundated and roads were underwater. The County received many flooding complaints from citizens in the area. As a result of flooding conditions, emergency measures were taken by the County. The County obtained SWFWMD authorization to undertake ditch cleaning or vegetative control for several drainage ditch systems in the County, including the Eagle-Millsite-Hancock drainage system. No SWFWMD ERP permit was required or obtained for this ditch cleaning and vegetative control. During its efforts to alleviate flooding and undertake emergency ditch maintenance along the Eagle-Millsite-Hancock drainage route, the County discovered a driveway culvert near Spirit Lake Road which was crushed and impeding flow. The evidence was unclear and contradictory as to the size of the culvert. Petitioner's evidence suggested that it consisted of a 24-inch pipe while evidence presented by the County and by SWFWMD suggested that it was a 56-inch by 36-inch arched pipe culvert. It is found that the latter evidence was more persuasive. On February 25, 1998, the County removed the crushed arched pipe culvert at Spirit Lake Road and replaced it with two 48-inch diameter pipes to allow water to flow through the system. The replacement of this structure did not constitute ditch maintenance, and it required a SWFWMD ERP. However, no ERP was obtained at that time (although SWFWMD was notified prior to the activity). (One of the eight specific construction items to be authorized under the subject ERP is the replacement of this culvert.) Old Florida Plantation, Ltd. (OFP) property also experienced flooding during February 1998. OFP's property is situated along the eastern shore of Lake Hancock, and the Eagle- Millsite-Hancock drainage system historically has flowed across the property before entering Lake Hancock. In the 1950's and 1960's, the property was mined for phosphate. The mining process destroyed the natural vegetation and drastically altered the soils and topography, resulting in the formation of areas of unnaturally high elevations and unnaturally deep pits that filled with water. OFP purchased the property from U.S. Steel in 1991. The next year OFP initiated reclamation of the property, which proceeded through approximately 1998. In 1996, OFP applied to the County for approval of a development of regional impact (DRI). OFP blamed the flooding on its property in 1998 on the County's activities upstream, claiming that the property had never flooded before. But upon investigation, the County discovered a 48-inch diameter pipe on OFP property which, while part of OFP's permitted drainage system, had been blocked (actually, never unopened) due to OFP's concerns that opening the pipe would wash away wetlands plants recently planted as part of OFP's wetland restoration efforts. With OFP and SWFWMD approval, the County opened this pipe in a controlled manner to allow flowage without damaging the new wetlands plants. Following the opening of this blocked pipe, OFP property upstream experienced a gradual drop in flood water levels. When the water level on OFP's property stabilized, it was five feet lower and no longer flooded. Nonetheless, OFP continues to maintain not only that the County's activities upstream caused flooding on OFP property but also that they changed historic flow conditions. This contention is rejected as not being supported by the evidence. Not only did flooding cease after the 48-inch pipe on OFP's property was opened, subsequent modeling of water flows also demonstrated that the County's replacement of the crushed box culvert at the driveway on Spirit Lake Road as described in Finding 8, supra, did not increase flood stages by the time the water flows into the OFP site and did not cause flooding on OFP property in 1998. (To the contrary, OFP actions to block flows onto its property may have contributed to flooding upstream.) On October 6, 1998, the County entered into a contract with BCI Engineers and Scientists to initiate a study on the Eagle-Millsite-Hancock drainage system, identify options for alleviating flooding along the system and prepare an application for an ERP to authorize needed improvements to the system. Prior to the County's submittal of an ERP application, SWFWMD issued a conceptual ERP to OFP for its proposed wet detention surface water management system to support its proposed DRI on the OFP property. OFP's conceptual permit incorporated the Eagle-Millsite-Hancock drainage system and accommodated off-site flowage into the system. Before submitting an ERP application to SWFWMD, the County had communications with representatives of OFP concerning an easement for the flow of the drainage system through OFP property. In March 1999, the County reached an understanding with OFP's engineering consultant whereby OFP would provide the County with an easement across OFP lands to allow water to flow through to Lake Hancock. In turn, the County would: construct and pay for a control structure and pipe east of OFP to provide adequate flowage without adversely affecting either upstream or downstream surface waters; construct and upgrade any pipes and structures needed to convey water across OFP property to Lake Hancock; and provide all modeling data for OFP's review. The ERP Application Following completion of the engineering study, the County submitted ERP Application No. 4419803.000 for a Standard General ERP to construct improvements to the Eagle-Millsite- Hancock drainage system on August 18, 1999. Eight specific construction activities are proposed under the County's project, at various points along the Eagle- Millsite-Hancock drainage system as follows: 1) Add riprap along channel bottom; 2) Modify culvert by replacing 56-inch by 36- inch arch pipe by two 48-inch pipes (after-the-fact, done in 1998, as described in Finding 8, supra); 3) Add riprap along channel bottom; 4) Add box, modify culvert by replacing existing pipe with two 48-inch pipes, add riprap along channel bottom; 5) add riprap along channel bottom; 6) Add weir, modify culvert by replacing existing 24-inch pipe with two 48-inch pipes, add riprap along channel bottom; 7) Add box and modify culvert by replacing existing 24-inch pipe with two 48-inch pipes; 8) Modify existing weir. Under the County's application, construction activities Nos. 6, 7, and 8 would occur on OFP property. In addition, it was proposed that surface water would flow across OFP's property (generally, following existing on-site drainage patterns), and it was indicated that flood elevations would rise in some locations on OFP's property as a result of the improvements proposed in the County's application. (Most if not all of the rise in water level would be contained within the relatively steep banks of the lakes on OFP's property--the reclaimed phosphate mine pits.) In its application, the County stated that it was in the process of obtaining easements for project area. As part of the ERP application review process, SWFWMD staff requested, by letter dated September 17, 1999, that the County clarify the location of the necessary rights-of-way and drainage easements for the drainage improvements and provide authorization from OFP as property owner accepting the peak stage increases anticipated in certain OFP lakes as a result of the County's proposed project activities. On September 28, 1999, OFP obtained a DRI development order (DO) from the County. In pertinent part, the DRI DO required that OFP not adversely affect historical flow of surface water entering the property from off-site sources. Historical flow was to be determined in a study commissioned by the County and SWFWMD. The DO appeared to provide that the study was to be reviewed by OFP and the County and approved by SWFWMD. Based on the study, a control structure and pipe was to be constructed, operated and maintained by the County at the upstream side of the property that would limit the quantity of off-site historical flow, unless otherwise approved by OFP. OFP was to provide the County with a drainage easement for this control structure and pipe, as well as a flowage easement from this structure, through OFP property, to an outfall into Lake Hancock. The DO specified that the flowage easement was to be for quantitative purposes only and not to provide water quality treatment for off-site flows. The DO required OFP to grant a defined, temporary easement prior to first plat approval. In its November 11, 1999, response to SWFWMD's request for additional information, the County indicated it would obtain drainage easements and that it was seeking written acknowledgment from OFP accepting the proposed increases in lake stages. During the ERP application review process, the County continued efforts to obtain flowage easements or control over the proposed project area and OFP's acknowledgment and acceptance of the increase in lake stages. At OFP's invitation, the County drafted a proposed cross-flow easement. But before a binding agreement could be executed, a dispute arose between OFP and the County concerning other aspects of OFP's development plans, and OFP refused to enter into an agreement on the cross- flow easement unless all other development issues were resolved as well. On August 4, 2000, in response to SWFWMD's request that the County provide documentation of drainage easements and/or OFP's acceptance of the increased lake stages on OFP property, the County submitted a proposed and un-executed Perpetual Flowage and Inundation Easement and an Acknowledgment to be signed by OFP accepting the increased lake stages. On August 7, 2000, the OFP property was annexed by the City of Bartow (the City). On October 16, 2000, the City enacted Ordinance No. 1933-A approving OFP's DRI application. The City's DO contained essentially the same provision on Off- Site Flow contained in the County's DO. See Finding 18, supra. However, the City's DO specified that the historical flow study was required to be reviewed and approved by OFP (as well as by the County and by SWFWMD). OFP has not given formal approval to historical flow studies done to date. On October 6, 2000, SWFWMD issued a Notice of Final Agency Action approving Polk County ERP No. 4419803.000. Permit Specific Condition No. 7 provides that "all construction is prohibited within the permitted project area until the Permittee acquires legal ownership or legal control of the project area as delineated in the permitted construction drawings." As a result of this permit condition, the County cannot undertake construction as authorized under the Permit until any needed easement or legal control is obtained. Precise Easement Route Approximately two months before final hearing, a dispute arose as to the precise cross-flow easement route proposed by the County. OFP had understood that the County's proposed route was based on a detailed survey. But closer scrutiny of the County's proposed route indicated that it cut corners of existing lakes on OFP's property, crossed residential lots proposed by OFP, and veered north into uplands (also proposed for residential use) in the western portion of the route before looping south and then north again to the outfall at Lake Hancock. Information subsequently revealed in the course of discovery suggested that the County's proposed route may have been based on pre-reclamation topography of OFP's property. After OFP recognized the implications of the cross- flow easement route being proposed by the County, OFP provided the County with several different alternative easement routes through the OFP property. While agreement as to the precise route has not yet been reached, the precise route of the easement is not significant to the County, as long as water can flow across OFP property to Lake Hancock and so long as the County does not have to re-locate existing ditches. Such adjustments in the location of the proposed flowage easement would not affect SWFWMD staff's recommendation for permit issuance, as long as it covered the defined project areas. In addition, OFP's current site plan is a preliminary, conceptual plan subject to change before it is finalized. Regardless what cross-flow easement route is chosen, it will be temporary and subject to modification when OFP's development plan is finalized. If the County is unable to not negotiate a flowage easement across OFP property, it could obtain whatever easement is required through use of the County's eminent domain powers. The County's acquisition of an easement to accommodate a flowage route and anticipated increased stage on OFP property gives reasonable assurance that any stage increases will not cause adverse impacts to OFP property and gives reasonable assurance that the County will have sufficient legal control to construct and maintain the improvements. Project Area The County applied for a Standard General Permit and specified a total project area of 0.95 acre. This acreage reflects the area required for actual construction and alteration of control structures and drainage ditches in the preexisting Eagle-Millsite-Hancock system. It does not reflect the entire acreage drained by that system (approximately 1,800 to 2,000 acres). It also does not reflect the area of the cross-flow easement, which the County has yet to obtain. When determining project size for purposes of determining the type of permit applicable to a project, SWFWMD staff considers maximum project area to be limited to the acreage owned or controlled by the applicant. In addition, since this is a retrofit project for improvement of an existing drainage system not now owned or controlled by the County, SWFWMD staff only measured the area required for actual construction and alteration of control structures and drainage ditches. Future easements necessary for future maintenance of the system were not included. When OFP applied for its conceptual ERP for its proposed DRI, the project area was considered to be the acreage owned by OFP. The rest of the basin draining through OFP's property to Lake Hancock (again, approximately 1,800 to 2,000 acres) was not considered to be part of the project area. Water Quantity Impacts The County's project will retrofit certain components of the same drainage system which OFP will utilize for surface water management and treatment pursuant to its conceptual ERP. Modeling presented in the County's application demonstrates that there will be some rises and some lowering of some of the lake levels on OFP's property during certain rain events. Anticipated rises are lower than the top of banks authorized in OFP's conceptual permit; hence the system will continue to function properly. While there are some differences in the County's permit application and OFP's conceptual permit application concerning modeling estimates of flow rates through OFP property, the differences are minor and are attributed to differences in modeling inputs. The County used more detailed modeling information. Any such differences are not significant. Differences in flow rates provided in the County's proposed permit and in OFP's conceptual permit do not render the permits as incompatible. If the County's permit were issued, any modeling undertaken in connection with a subsequent application by OFP for a construction permit would have to be updated to include the County's improvements to the system. This outcome is not a basis for denial of the County's permit. While the rate at which water will flow through the system will increase, no change in volume of water ultimately flowing through the drainage system is anticipated as a result of the County's proposed improvements. The increased lake stages which are anticipated to occur on OFP property as a result of the County's project will not cause adverse water quantity impacts to the receiving waters of Lake Hancock or adjacent lands. The project will not cause adverse flooding to on-site or off-site property. The project will not cause adverse impacts to existing surface water storage and conveyance capabilities. The project will not adversely impact the maintenance of surface or ground water levels or surface water flows established pursuant to Chapter 373.042, Florida Statutes. Water Quality Impacts No adverse impacts to water quality on OFP property are anticipated from the County's proposed drainage improvements. The project will not add any pollutant loading source to the drainage system and is not expected to cause any algae blooms or fish kills in OFP waters or cause any additional nutrient loading into OFP's surface water management systems. As reclaimed phosphate mine pits, the lakes on OFP's property are high in phosphates. Meanwhile, water quality in upstream in Millsite Lake and Eagle Lake is very good. Off-site flow of higher quality water flushing the OFP lakes will improve the water quality on the OFP site. The County's project will have no adverse impact on the quality of water in the downstream receiving of Lake Hancock (which currently has poor water quality due in large part to past phosphate mining). Upstream of OFP, the project will not cause any adverse water quality impacts and is anticipated to result in positive impacts by lessening the duration of any flooding event and thereby lessening septic tank inundation from flooding. This will have a beneficial impact on public health, safety, and welfare. Thus, there is a public benefit to be gained in having the County undertake the proposed drainage and flood control improvements now, rather than waiting for OFP to finalize its plat and construct its development project. The County's proposed improvements do not require any formal water quality treatment system. The improvements are to a conveyance system and no impervious surfaces or other facilities generating pollutant loading will be added. Upstream of OFP, the Eagle-Millsite-Hancock drainage system flows through natural lakes and wetlands systems that provide natural water quality treatment of the existing drainage basin. OFP expressed concern that the County's improvements to drainage through these areas (including the ditch maintenance already performed in 1998) will increase flow and reduce residence time, thereby reducing natural water quality treatment. But ditch maintenance does not require an ERP, and the County gave reasonable assurances that reduction in natural water quality treatment will not be significant, especially in view of the good quality of the water flowing through the system out of Eagle Lake and Millsite Lake. As a result, it is found that the County's proposed project will not adversely affect the quality of receiving waters such that any applicable quality standards will be violated. Indeed, OFP's expert consultant conceded in testimony at final hearing that OFP has no reason to be concerned about the quality of water at present. Rather, OFP's real concern is about water quality in the future. Essentially, OFP is asking SWFWMD to require the County to guarantee OFP that future development in the area will not lead to any water quality problems. Requiring such a guarantee as a condition to issuance of an ERP would go far beyond SWFWMD requirements and is never required of any applicant. Besides being speculative on the evidence in this case, future development in the area will be required to meet applicable SWFWMD water quality requirements. SWFWMD permitting required for such future development would be the proper forum for OFP to protect itself against possible future reduction in water quality (as well as possible future increase in water quantity). Environmental Impacts The drainage ditches to be improved by the County's project were originally constructed before 1984. These upland cut ditches were not constructed for the purpose of diverting natural stream flow, and are not known to provide significant habitat for any threatened or endangered species. The County provided reasonable assurance that the proposed project will not change the hydroperiod of a wetland or other surface water, so as to adversely affect wetland functions or other surface water functions. The functions of the wetlands and surface waters to be affected by the proposed project include conveyance, some water quality treatment, and possibly some wildlife movement or migration functions between the wetlands served by the ditches. Wetland impacts from the project consists of .63 acre of permanent impacts and .21 acre of temporary impacts, for a total of .84 acre of impact. The permanent impacts consist of the replacement of pipes with new structures in the ditches and the addition of rip rap in areas to prevent sedimentation and erosion. The proposed project's anticipated increase in the rate of flow is expected to lessen the duration of any flooding event at the upper end of the drainage system, and at the downstream end is expected to create a subsequent rise in some of the lakes and storage areas on the OFP property during certain rain events. The anticipated rise in some of the reclaimed lakes on OFP property is not anticipated to have any adverse impact on the functions that those surface waters provide to fish, wildlife or any threatened or endangered species. The reclaimed lakes subject to rise in water levels for certain rain events are steep-sided and do not have much littoral zone, and little, if any, loss of habitat will result. The County's application provides reasonable assurance that the anticipated stage increase in affected wetlands or surface waters will not adversely affect the functions provided by those wetlands or surface waters. The County provided reasonable assurance that the proposed project will not violate water quality standards in areas where water quality standards apply, in either the short- term or the long-term. Long-term effects were addressed in Finding 43-51, supra. Short-term water quality impacts anticipated during the construction of the proposed improvements will be addressed through the use of erosion and sediment controls. The proposed project also will not create any adverse secondary impacts to water resources. The project will not cause any adverse impacts to the bird rookery located to the north on OFP property. The project will not cause any adverse impacts to the bass in OFP's lakes, a concern expressed by OFP relatively recently. To the contrary, since the project will improve water quality in OFP's lakes, the impact on OFP's bass is expected to be positive. OFP raised the issue of a bald eagle nesting site located on its property. The evidence was that a pair of bald eagles has built a nest atop a Tampa Electric Company (TECO) power pole on the property in October of each year since 1996. Each year the pair (which is thought to be the same pair) has used a different TECO power pole. Most of the nests, including the one built in October 2000, have been on poles well south of any construction proposed under the County's ERP and clearly outside of the primary and secondary eagle management zones designated by the U.S. Fish and Wildlife Service. But one year, a nest was built on a pole farther north and possibly within the secondary eagle management zone. OFP presented testimony that U.S. Fish and Wildlife would require OFP to apply for an "incidental take" in order to build homes within the primary eagle protection zones around any of the four poles on which eagles have built nests since 1996; timing of construction of homes within the secondary protection zones may be affected. Even accepting OFP's testimony, there was no evidence as to how U.S. Fish and Wildlife would view construction of the County's proposed drainage improvements on OFP property within those zones. In addition, the evidence was that, in order to accomplish its DRI plans to build homes in the vicinity of the TECO power poles that have served as eagle nests in recent years, without having to apply for an "incidental take," OFP plans to place eagle poles (more suitable for eagle nests than power poles, which actually endanger the eagles) in another part of its property which is much more suitable habitat in order to encourage the eagles to build their nest there. The new location would put the County's proposed construction activity far outside the primary and secondary eagle management zones. Other Permitting Requirements The County's proposed project is capable, based on generally accepted scientific engineering and scientific principles, of being effectively performed and of functioning as proposed. The County has the financial, legal, and administrative capability of ensuring that the activity proposed to be undertaken can be done in accordance with the terms and conditions of the permit. No evidence was presented by Petitioner that the Project will cause adverse impacts to any work of the District established under Section 373.086, Florida Statutes. No evidence was presented by Petitioner that the project will not comply with any applicable special basin or geographic area criteria established under Chapter 40D-3, Florida Administrative Code.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order issuing Standard General Environmental Resource Permit No. 4419803.000. DONE AND ENTERED this 17th day of September, 2001, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of September, 2001. COPIES FURNISHED: Linda L. McKinley, Esquire Polk County Attorney's Office Post Office Box 9005, Drawer AT01 Bartow, Florida 33831-9005 Gregory R. Deal, Esquire 1525 South Florida Avenue, Suite 2 Lakeland, Florida 33803 Margaret M. Lytle, Esquire Martha A. Moore, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899 E. D. Sonny Vergara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (2) 373.042373.086 Florida Administrative Code (12) 40D-1.60340D-1.610540D-4.02140D-4.09140D-4.10140D-4.30140D-4.30240D-4.38140D-40.04040D-40.30262-302.30062-4.242
# 9
MARTIN COUNTY AND ST. LUCIE COUNTY vs ALL ABOARD FLORIDA - OPERATIONS, LLC; FLORIDA EAST COAST RAILWAY, LLC; AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 16-005718 (2016)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 30, 2016 Number: 16-005718 Latest Update: Nov. 16, 2017

The Issue The issues to be determined in these consolidated cases are whether All Aboard Florida – Operations, LLC (“the Applicant”), and Florida East Coast Railway, LLC (“FECR”), are entitled to an Environmental Resource Permit Modification authorizing the construction of a stormwater management system and related activities to serve railway facilities, and a verification of exemption for work to be done at 23 roadway crossings (collectively referred to as “the project”).

Findings Of Fact The Parties Petitioners Martin County and St. Lucie County are political subdivisions of the State of Florida. Petitioners have substantial interests that could be affected by the District’s proposed authorizations. Intervenor Town of St. Lucie Village is a political subdivision of the State of Florida. Intervenor has substantial interests that could be affected by the District’s proposed authorizations. The Applicant, All Aboard Florida – Operations, LLC, is a Delaware limited liability company based in Miami. All Aboard Florida is part of a group of corporate entities formed for the principal purpose of developing and operating express passenger train service in Florida. Co-applicant Florida East Coast Railway, LLC, is a Florida limited liability company based in Jacksonville. FECR owns the existing railway corridor the passenger train service will use between Miami and Cocoa. South Florida Water Management District is a regional agency granted powers and assigned duties under chapter 373, part IV, Florida Statutes, including powers and duties related to the regulation of construction activities in wetlands. The proposed activities are within the boundaries of the District. Background The objective of the All Aboard Florida Project is to establish express passenger train service connecting four large urban areas: Miami, Fort Lauderdale, West Palm Beach, and Orlando. Most of the passenger service route, including the portion which will pass through Martin County and St. Lucie County, will use an existing railroad right-of-way used since the late 1800s. The FECR rail corridor runs along Florida’s east coast from Miami to Jacksonville. It supported passenger and freight operations on shared double mainline tracks from 1895 to 1968. The passenger service was terminated in 1968 and portions of the double track and certain bridge structures were removed. The freight service continued and remains in operation today. The passenger service will use the FECR right-of-way from Miami to Cocoa and then turn west on a new segment to be constructed from Cocoa to Orlando. The railway corridor will be operated as a joint facility, with passenger and freight trains sharing the double mainline tracks. The Applicant is upgrading the portion of the corridor between Miami and Cocoa by, among other things, replacing existing railroad ties and tracks, reinstalling double mainline tracks, and improving grade crossings. The Applicant is also installing Positive Train Control systems which provide integrated command and control of passenger and freight train movements and allow the trains to be directed and stopped remotely or automatically in the event of operator error or disability, or an obstruction on the track. The All Aboard Florida Project is being developed in two phases, Phase I extends from Miami to West Palm Beach, and Phase II from West Palm Beach to Orlando. This proceeding involves a segment within Phase II, known as Segment D09, which runs from just north of West Palm Beach to the northern boundary of St. Lucie County. The railway corridor in Segment D09 passes through Jonathan Dickinson State Park in Martin County and the Savannas Preserve State Park, parts of which are in both Martin County and St. Lucie County. Surface waters within these state parks are Outstanding Florida Waters (“OFWs”). The railway in Segment D09 also passes over the St. Lucie River using a bridge that can be opened to allow boats to pass. The Applicant plans to run 16 round trips per day between Miami and Orlando, which is about one train an hour in each direction, starting early in the morning and continuing to mid-evening. In 2013, the District issued the Applicant an exemption under section 373.406(6), which exempts activities having only minimal or insignificant adverse impacts on water resources. The 2013 exemption covers proposed work in approximately 48 of the 65 miles which make up Segment D09, and includes replacement of existing tracks and re-establishment of a second set of mainline tracks where they were historically located. The 2013 exemption covers all but 24 of the roadway crossings within Segment D09 where work is to be done in connection with the All Aboard Florida Project. In 2015, the District issued the Applicant a general permit under rule 62-330.401, which authorizes activities that are expected to cause minimal adverse impacts to water resources, for the installation of fiber optic cable along the rail bed within Segment D09. The 2013 exemption and 2015 general permit were not challenged and became final agency action. The Proposed Agency Actions The ERP Modification covers work to be done in approximately 17 of the 65 miles which make up Segment D09. The work will consist primarily of replacing existing tracks, installing new tracks, making curve modifications in some locations to accommodate faster trains, culvert modifications, and work on some fixed bridge crossings over non-navigable waters. The 2017 Exemption at issue in this proceeding covers improvements to 23 of the 24 roadway crossings that were not covered by the 2013 exemption. Proposed improvements at Southeast Florida Street in Stuart will be permitted separately. The improvements covered by the 2017 Exemption include upgrading existing safety gates and signals; installing curbs, guardrails, and sidewalks; resurfacing some existing paved surfaces; and adding some new paving. Petitioners argue that, because the District’s staff report for the ERP Modification states that the ERP does not cover work at roadway crossings, track work at roadway crossings has not been authorized. However, the staff report was referring to the roadway improvements that are described in the 2017 Exemption. The proposed track work at the roadway crossings was described in the ERP application and was reviewed and authorized by the District in the ERP Modification. “Segmentation” Petitioners claim it was improper for the District to separately review and authorize the proposed activities covered by the 2013 exemption, the 2015 general permit, the ERP Modification, and the 2017 Exemption. Petitioners contend that, as a consequence of this “segmentation” of the project, the District approved “roads to nowhere,” by which Petitioners mean that these activities do not have independent functionality. Petitioners’ argument is based on section 1.5.2 of the Applicant’s Handbook, Volume 1,1/ which states that applications to construct phases of a project can only be considered when each phase can be constructed, operated, and maintained totally independent of future phases. However, the activities authorized by the four agency actions are not phases of a project. They are all parts of Phase II of the All Aboard Florida Project, which is the passenger railway from West Palm Beach to Orlando. Section 1.5.2 is not interpreted or applied by the District as a prohibition against separate review and approval of related activities when they qualify under the District’s rules for exemptions, general permits, and ERPs. Much of Phase II is outside the District’s geographic boundaries and, therefore, beyond its regulatory jurisdiction. The District can only review and regulate a portion of Phase II. The District is unable to review this portion as a stand-alone railway project that can function independently from other project parts. The Proposed Stormwater Management System Where the Applicant is replacing existing tracks or re- establishing a second set of tracks, it will be laying new ties, ballast, and rail on previously-compacted earth. In those areas, no stormwater management modifications were required by the District. The Applicant’s new proposed stormwater management system will be located in a five-mile area of the corridor where an existing siding will be shifted outward and used as a third track. In this area, swales with hardened weir discharge structures and skimmers will be installed to provide stormwater treatment beyond what currently exists. The weir discharge structures will serve to prevent erosion at discharge points. The skimmers will serve to capture any floating oils or refuse. Because the FECR right-of-way is not wide enough in some three-track areas to also accommodate swales, the proposed stormwater management system was oversized in other locations to provide compensating volume. The District determined that this solution was an accepted engineering practice for linear systems such as railroads. Petitioners argue that the Applicant’s proposed stormwater management system is deficient because some of the proposed swales do not meet the definition of “swale” in section 403.803(14) as having side slopes equal to or greater than three feet horizontal to one foot vertical (3:1). The statute first defines a swale to include a manmade trench which has “a top width-to-depth ratio of the cross-section equal to or greater than 6:1.” The swales used in the proposed stormwater management system meet this description. Petitioners showed that the plans for one of the 46 proposed swales included some construction outside the FECR right-of-way. In response, the Applicant submitted revised plan sheets to remove the swale at issue. The Emergency Access Way The ERP application includes proposed modifications to portions of an existing unpaved emergency access way which runs along the tracks in some areas. The access way is a private dirt road for railroad-related vehicles and is sometimes used for maintenance activities. At the final hearing, Petitioners identified an inconsistency between an application document which summarizes the extent of proposed new access way construction and the individual plan sheets that depict the construction. The Applicant resolved the inconsistency by correcting the construction summary document. Petitioners also identified an individual plan sheet showing proposed access way modifications to occur outside of the FECR right-of-way. This second issue was resolved by eliminating any proposed work outside the right-of-way. Petitioners believe the proposed work on the access way was not fully described and reviewed because Petitioners believe the access way will be made continuous. However, the access way is not continuous currently and the Applicant is not proposing to make it continuous. No District rule requires the access way segments to be connected as a condition for approval of the ERP. Water Quantity Impacts An applicant for an ERP must provide reasonable assurance that the construction, operation, and maintenance of a proposed project will not cause adverse water quantity impacts to receiving waters and adjacent lands, adverse flooding to on-site or off-site property, or adverse impacts to existing surface water storage and conveyance capabilities. The District’s design criterion to meet this requirement for water quantity management is a demonstration that the proposed stormwater system will capture the additional runoff caused during a 25-year/3-day storm event. The Applicant’s proposed stormwater system meets or exceeds this requirement. Petitioners argue that the Applicant failed to provide reasonable assurance because the ERP application materials did not include a calculation of the discharge rates and velocities for water discharging from the swales during the design storm. The ERP application contains the information required to calculate the discharge rates and velocities and the Applicant’s stormwater expert, Bruce McArthur, performed the calculations and testified at the final hearing that in the areas where there will be discharges, the discharge rates and velocities would be “minor” and would not cause adverse impacts. The District’s stormwater expert, Jesse Markle, shared this opinion. Petitioners argue that this information should have been provided to the District in the permit application, but this is a de novo proceeding where new evidence to establish reasonable assurances can be presented. Petitioners did not show that Mr. McArthur is wrong. Petitioners failed to prove that the proposed project will cause adverse water quantity impacts, flooding, or adverse impacts to surface water storage and conveyance capabilities. Water Quality Impacts To obtain an ERP, an applicant must provide reasonable assurance that the construction, operation, and maintenance of a regulated project will not adversely affect the quality of receiving waters, such that state water quality standards would be violated. The District’s design criteria for water quality required the Applicant to show that its proposed stormwater system will capture at least 0.5 inches of runoff over the developed area. To be conservative, the Applicant designed its proposed system to capture 1.0 inch of runoff in most areas. Under District rules, if a stormwater system will directly discharge to impaired waters or OFWs, an additional 50 percent of water quality treatment volume is required. The proposed stormwater system will not directly discharge to either impaired waters or OFWs. In some locations, there is the potential for stormwater discharged from the proposed stormwater system to reach OFWs by overland flow, after the stormwater has been treated for water quality purposes. The Applicant designed its proposed stormwater system to provide at least an additional 50 percent of water quality treatment volume in areas where this potential exists. To ensure that the proposed construction activities do not degrade adjacent wetlands, other surface waters, or off-site areas due to erosion and sedimentation, the Applicant prepared an Erosion and Sediment Control Plan. Temporary silt fences and turbidity barriers will be installed and maintained around the limits of the construction. The District’s design criteria for water quality do not require an analysis of individual contaminants that can be contained in stormwater, except in circumstances that do not apply to this project. Compliance with the design criteria creates a presumption that water quality standards for all potential contaminants are met. See Applicant’s Handbook, V. II, § 4.1.1. Although not required, the Applicant provided a loading analysis for the proposed swales which could potentially discharge overland to impaired waters or OFWs. The analysis compared pre- and post-development conditions and showed there would be a net reduction in pollutant loading. Petitioners believe the pollutant loading analysis was inadequate because it did not specifically test for arsenic and petroleum hydrocarbons. However, the analysis was not required and adequate treatment is presumed. Petitioners did not conduct their own analysis to show that water quality standards would be violated. Petitioners’ expert, Patrick Dayan, believes the compaction of previously undisturbed soils in the emergency access way would increase stormwater runoff. However, he did not calculate the difference between pre- and post-construction infiltration rates at any particular location. His opinion on this point was not persuasive. Petitioners failed to prove that the proposed project will generate stormwater that will adversely affect the quality of receiving waters such that state water quality standards would be violated. The preponderance of the evidence shows the project complies with District design criteria and will not cause water quality violations. Soil and Sediment Contamination Petitioners argue that the ERP Modification does not account for the disturbance of existing contaminants in soils and sediments that could be carried outside of the right-of-way and into OFWs. Petitioners’ argument is based on investigations by their geologist, Janet Peterson, who collected soil, sediment, and surface water samples at 13 sites along the FECR rail corridor in the vicinity of OFWs, or surface waters that eventually flow into OFWs. During her sampling visits, Ms. Peterson saw no visual evidence of an oil spill, fluid leak, or other release of hazardous materials. Ms. Peterson compared her soil sample results to the Residential Direct Exposure Soil Cleanup Target Levels (“SCTLs”) established in rule 62-777. The SCTLs are the levels at which toxicity becomes a human health concern and the residential SCTLs assume soil ingestion of 200 mg/day for children, and 100 mg/day for adults, 350 days a year, for 30 years. Some of the soil sampling results showed exceedances of SCTLs, but the SCTLs are not applicable here because none of the sample sites are locations where children or adults would be expected to ingest soil at such levels for such lengths of time. Petitioners did not show that the contaminants are likely to migrate to locations where such exposure would occur. Ms. Peterson compared her soil sample results to the Marine Surface Water Leachability SCTLs, but she did not develop site-specific leachability-based SCTLs using DEP’s approved methodology. Nor did she show that the proposed project will cause the soils to leach the contaminants. Ms. Peterson collected sediment samples from shorelines, but not where construction activities are proposed. She compared her sediment sample results to the Florida Department of Environmental Protection’s (“DEP”) Sediment Quality Assessment Guidelines (“SQAGs”). These guidelines are not water quality standards. Any exceedance of these guidelines requires further analysis to determine potential water quality impacts. Ms. Peterson did not conduct the analysis. Ms. Peterson acknowledged that there are numerous sources for these pollutants at or near her sample sites, such as high-traffic roads, vehicular bridges, commercial and industrial facilities, boatyards, and golf courses. She did not establish baselines or controls. Ms. Peterson collected surface water samples at seven sites, some of which were located outside the FECR right-of-way. The results showed levels of phosphorous and nitrogen above the criteria for nutrients at some locations. Phosphorous, nitrogen, and the other nutrients are prevalent in the waters of Martin County and St. Lucie County and come from many sources. Petitioners’ evidence focused on existing conditions and not expected impacts of the proposed project. The evidence was insufficient to prove the proposed project will cause or contribute to water quality violations. Functions Provided by Wetlands and Other Surface Waters An applicant for an ERP must provide reasonable assurance that a proposed project will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Petitioners claim the Applicant and District should not have relied on Florida Land Use Cover and Forms Classification System (“FLUCCS”) maps to identify and characterize wetlands and other habitat areas because the maps are too general and inaccurate. However, the FLUCCS maps were not used by the Applicant or District to evaluate impacts to wetlands or other habitats. The Applicant began its evaluation of impacts to wetlands and other habitat areas by field-flagging and surveying the wetland and surface water boundaries in the project area using a GPS device with sub-meter accuracy. It then digitized the GPS delineations and overlaid them with the limits of construction to evaluate anticipated direct impacts to wetlands and other surface waters. The District then verified the delineations and assessments in the field. The Applicant and District determined that there are a total of 4.71 acres of wetlands within the FECR right-of-way, including tidal mangroves, freshwater marsh, and wet prairie. They also determined the proposed project will directly impact 0.35 acres of wetlands, consisting of 0.09 acres of freshwater marsh and 0.26 acres of mangroves. Petitioners contend that the Applicant failed to account for all of the project’s wetland impacts, based on the wetland delineations made by their wetland expert, Andrew Woodruff. Most of the impacts that Mr. Woodruff believes were not accounted for are small, between 0.01 and 0.05 acres. The largest one is acres. The Applicant’s delineations are more reliable than Mr. Woodruff’s because the methodology employed by the Applicant had greater precision. It is more likely to be accurate. Petitioners argue that the 2013 exemption and the 2015 general permit did not authorize work in wetlands and, therefore, the impacts they cause must be evaluated in this ERP Modification. However, Petitioners did not prove that there are unaccounted-for wetland impacts associated with those authorizations. Any impacts associated with best management practices for erosion control, such as the installation of silt fences, would be temporary. The District does not include such temporary minor impacts in its direct, secondary, or cumulative impacts analyses. Most of the wetlands that would be directly impacted by the ERP Modification are degraded due to past hydrologic alterations and soil disturbances from the original construction and historical use of the FECR railway corridor, and infestation by exotic plant species. Most of these wetlands are also adjacent to disturbed uplands within or near the rail corridor. The functional values of most of the wetlands that would be affected have been reduced by these disturbances. The Applicant provided reasonable assurance that the project will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Secondary Impacts Section 10.2.7 of the Applicant’s Handbook requires an applicant to provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonably expected uses of a proposed activity (a) will not cause or contribute to violations of water quality standards or adverse impacts to the functions of wetlands or other surface waters; (b) will not adversely impact the ecological value of uplands for bald eagles, and aquatic or wetland-dependent listed animal species for nesting or denning by these species; (c) will not cause impacts to significant historical or archaeological resources; and (d) additional phases for which plans have been submitted, and closely linked projects regulated under chapter 373, part IV, will not cause water quality violations or adverse impacts to the functions of wetlands or other surface waters. The proposed work will be entirely within the limits of the existing railway corridor where secondary impacts to wetlands and other surface waters caused by noise, vibration, fragmentation of habitats, and barriers to wildlife have existed for decades. The preponderance of the evidence shows that any increase in these kinds of impacts would be insignificant and would not reduce the current functions being provided. Because the affected wetlands are not preferred habitat for wetland-dependent, endangered, or threatened wildlife species, or species of special concern, and no such species were observed in the area, no adverse impacts to these species are expected to occur. Petitioners contend that adverse impacts will occur to the gopher tortoise, scrub jay, and prickly apple cactus. These are not aquatic or wetland-dependent species. However, the preponderance of the evidence shows any increase in impacts to these species would be insignificant. When the train bridges are closed, boats with masts or other components that make them too tall to pass under the train bridges must wait for the bridge to open before continuing. Petitioners contend that the current “stacking” of boats waiting for the bridges to open would worsen and would adversely impact seagrass beds and the West Indian Manatee. However, it was not shown that seagrass beds are in the areas where the boats are stacking. The available manatee mortality data does not show a link between boat stacking and boat collisions with manatees. Mr. Woodruff’s opinion about increased injuries to manatees caused by increased boat stacking was speculative and unpersuasive. The preponderance of the evidence shows that the adverse effects on both listed and non-listed wildlife species, caused by faster and more numerous trains would be insignificant. The activities associated with the 2013 exemption and the 2015 general permit for fiber optic cable were based on determinations that the activities would have minimal or insignificant adverse impacts on water resources. These determinations are not subject to challenge in this proceeding. The Applicant provided reasonable assurance that the secondary impacts of the project will not cause or contribute to violations of water quality standards, adversely impact the functions of wetlands or other surface waters, adversely impact the ecological value of uplands for use by listed animal species, or cause impacts to significant historical or archaeological resources. Elimination and Reduction of Impacts Under section 10.2.1.1 of the Applicant’s Handbook, if a proposed activity will result in adverse impacts to wetlands and other surface waters, the applicant for an ERP must implement practicable design modifications to eliminate or reduce the impacts, subject to certain exceptions that will be discussed below. Petitioners argue that this rule requires the Applicant and District to evaluate the practicability of alternative routes through the region, routes other than the existing railway corridor in Segment D09. As explained in the Conclusions of Law, that argument is rejected. The evaluation of project modifications to avoid impacts was appropriately confined to the railway corridor in Segment D09. The Applicant implemented practicable design modifications in the project area to reduce or eliminate impacts to wetlands and other surface waters. Those modifications included the shifting of track alignments, the elimination of certain third-track segments, and the elimination of some proposed access way modifications. However, the project qualified under both “opt out” criteria in section 10.2.1.2 of the Applicant’s Handbook so that design modifications to reduce or eliminate impacts were not required: (1) The ecological value of the functions provided by the area of wetland or surface water to be adversely affected is low, and the proposed mitigation will provide greater long-term ecological value; and (2) the applicant proposes mitigation that implements all or part of a plan that provides regional ecological value and provides greater long-term ecological value. Mitigation The Applicant proposes to mitigate for impacts to wetlands by purchasing mitigation credits from four District- approved mitigation banks: the Bluefield Ranch, Bear Point, Loxahatchee, and F.P.L. Everglades Mitigation Banks. Each is a regional off-site mitigation area which implements a detailed management plan and provides regional long-term ecological value. The number of mitigation credits needed to offset loss of function from impacts to wetlands was calculated using the Modified Wetland Rapid Assessment Procedure (“MWRAP”) or Wetland Assessment Technique for Environmental Review (“WATER”), as prescribed in the state permit for each mitigation bank. Applying these methods, the Applicant is required to purchase mitigation credits. The Applicant proposed to mitigate the adverse impacts to freshwater marsh wetlands by purchasing 0.01 freshwater herbaceous credits from the Bluefield Ranch Mitigation Bank, and 0.06 freshwater herbaceous credits from the Loxahatchee Mitigation Bank. The adverse impacts to tidal mangrove wetlands would be mitigated by purchasing 0.12 saltwater credits from the Bear Point Mitigation Bank, and 0.02 saltwater credits from the F.P.L. Everglades Mitigation Bank. The Applicant committed to purchase an additional 0.29 freshwater herbaceous credits from the Bluefield Ranch Mitigation Bank, for a total of 0.50 mitigation credits. The proposed mitigation implements a plan that will provide greater long-term ecological value than is provided by the wetlands that will be impacted. The Applicant proved by a preponderance of the evidence that the project complies with the District’s mitigation requirements. Cumulative Impacts To obtain an ERP, an applicant must provide reasonable assurance that a regulated activity will not result in unacceptable cumulative impacts to water resources. This assurance can be provided by proposing to fully mitigate the impacts within the same basin. However, when an applicant proposes mitigation in another drainage basin, the applicant must demonstrate that the regulated activity will not cause unacceptable cumulative impacts. The proposed project will adversely impact 0.02 acres of freshwater marsh wetlands and 0.21 acres of tidal mangrove wetlands in the St. Lucie River basin. The impacts to the freshwater marshes must be mitigated out-of-basin because there are no mitigation banks in the basin which offer freshwater herbaceous mitigation credits. The proposed project will adversely impact 0.07 acres of the freshwater marshes and 0.05 acres of the mangrove wetlands in the Loxahatchee River basin. Those impacts must also be mitigated out-of-basin because there are no mitigation banks in the Loxahatchee River basin. Because some of the Applicant’s proposed mitigation must be provided out-of-basin, the ERP application included a cumulative impact analysis. The analysis evaluated whether the proposed project, when considered in conjunction with other possible development within the St. Lucie River and Loxahatchee River drainage basins, would result in unacceptable cumulative impacts considering each basin as a whole. There are approximately 10,068 acres of freshwater marshes within the St. Lucie basin, of which an estimated 4,929 acres are not preserved and would be at risk of potential future development. The proposed project will adversely impact 0.02 of those acres, which is only 0.0004 percent of the total at-risk acreage. There are about 34,000 acres of freshwater marshes within the Loxahatchee River basin, of which an estimated 7,463 acres are at risk of future development, and approximately 564 acres of tidal mangrove wetlands, of which an estimated 75 acres are at risk of future development. The project will adversely impact 0.07 acres of the freshwater marshes (0.0009 percent), and 0.05 acres of the tidal mangrove wetlands (0.0667 percent). Petitioners contend the Applicant’s analysis did not account for impacts from proposed activities authorized in the 2013 and 2015 general permit. However, Petitioners failed to prove there are unaccounted-for wetland impacts. The preponderance of the evidence supports the District’s determination that the proposed project will not cause unacceptable cumulative impacts to wetlands and other surface waters. Public Interest When an applicant seeks authorization for a regulated activity in, on, or over wetlands or surface waters, it must provide reasonable assurance that the activity will not be contrary to the public interest, or if the activity is within or significantly degrades an OFW, is clearly in the public interest, as determined by balancing the following criteria set forth in section 373.414(1)(a): Whether the activities will adversely affect the public health, safety, or welfare or the property of others; Whether the activities will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the activities will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the activities will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; Whether the activities will be of a temporary or permanent nature; Whether the activities will adversely affect or will enhance significant historical and archaeological resources; and The current condition and relative value of functions being performed by areas affected by the proposed activities. The proposed work is not within an OFW, but entirely within the FECR corridor. The potential for overland flow and indirect impacts to OFWs is addressed by additional treatment of the stormwater prior to discharge. The proposed project would not significantly degrade an OFW. Therefore, the applicable inquiry is whether the project is contrary to the public interest. Factor 1: Public Safety, Safety, and Welfare Petitioners contend that the proposed project will adversely affect public health, safety, and welfare by impacting water quantity, water quality, and certain non-environmental matters such as emergency response times, traffic congestion, and potential train collisions with pedestrians and vehicles. Potential environmental impacts have been addressed above and, by a preponderance of the evidence, the District and the Applicant showed that such impacts would be insignificant or would be mitigated. As to the potential for non-environmental impacts associated with train operations, it is explained in the Conclusions of Law that the public interest test does not include consideration of non-environmental factors other than those expressly articulated in the statute, such as navigation and preservation of historical or archaeological resources. However, because evidence of non-environmental impacts was admitted at the final hearing, the issues raised by Petitioners will be briefly addressed below. The regulatory agency with specific responsibility for railroad safety is the Federal Railroad Administration (“FRA”). The FRA reviewed the safety features associated with the proposed passenger train operations, and approved them. Public safety will be enhanced at roadway crossings because of the proposed improvements and the use of modern technology in monitoring and managing the movement of trains. Petitioners contend that the addition of the passenger rail service will impede emergency response times in Martin County and St. Lucie County due to more frequent roadway closures. However, freight trains currently impede emergency response times due to their length and slow speed. The passenger trains will be much shorter in length and faster so that roadway crossing closures for passing passenger trains will be much shorter than for freight trains. The ERP Modification and 2017 Exemption do not affect freight train operations. The preponderance of the evidence shows that passenger rail service is unlikely to cause a material increase in the occurrence of circumstances where an emergency responder is impeded by a train. The current problem must be addressed through changes in freight train operations. Petitioners also contend that the passenger rail service will interfere with hurricane evacuation. The persuasive evidence does not support that contention. Train service would cease when a hurricane is approaching. Petitioners contend the trains will have to be “staged” on either side of the two moveable bridges while other trains cross, thereby blocking road intersections. However, this was a matter of speculation. The Applicant does not propose or want to stage trains at the bridges. Petitioners contend that the project will cause hazards to boaters on the St. Lucie River because there will be more times when the train bridge will be closed to allow the passage of passenger trains. Although there were many statistics presented about the number of boats affected, the evidence was largely anecdotal with respect to the current hazard associated with boaters waiting for the passage of freight trains and speculative as to the expected increase in the hazard if shorter and faster passenger trains are added. Factor 2: Conservation of Fish and Wildlife As previously found, the proposed activities will not adversely affect the conservation of fish and wildlife, including threatened or endangered species. The preponderance of the evidence shows the project will have only insignificant adverse impacts on water resources and wildlife. Factor 3: Navigation of the Flow of Water Petitioners claim the project will hinder navigation on the St. Lucie and Loxahatchee Rivers because of the increase in bridge closures if passenger trains are added. The U.S. Coast Guard is the agency with clear authority to regulate the opening and closing of moveable train bridges over navigable waters in the interests of navigation. Petitioners’ insistence that the District address the bridge openings is novel. No instance was identified by the parties where this District, any other water management district, or DEP has attempted through an ERP to dictate how frequently a railroad bridge must open to accommodate boat traffic. The Coast Guard is currently reviewing the project’s potential impacts on navigation and will make a determination about the operation of the moveable bridges. It has already made such a determination for the moveable bridge which crosses the New River in Ft. Lauderdale. Petitioners point to section 10.2.3.3 of the Applicant’s Handbook, which states that the District can consider an applicant’s Coast Guard permit, and suggest that this shows the District is not limited to what the Coast Guard has required. However, Section 10.2.3.3 explains the navigation criterion in terms of preventing encroachments into channels and improving channel markings, neither of which encompasses the regulation of train bridges. The preponderance of the evidence shows the project would not cause harmful erosion or shoaling or adversely affect the flow of water. Factor 4: Fishing, Recreational Values, and Marine Productivity The preponderance of the evidence shows that there would be no adverse impacts or only insignificant impacts to fishing or recreational values and marine productivity. Factor 5: Permanent Impact The proposed project will have both temporary and permanent impacts. The temporary impacts include the installation of silt fences and turbidity barriers designed to reduce water quality impacts and impacts to functions provided by wetlands and surface waters. The impacts due to track installation, construction and rehabilitation of the non-moveable bridges, at-grade crossing improvements, and stormwater system improvements are permanent in nature. The permanent impacts have been minimized and mitigated. Factor 6: Historical or Archaeological Resources Petitioners do not contend that the project will adversely affect significant historical or archaeological resources. Factor 7: Wetland Functions in Areas Affected Because the proposed work is within the limits of an existing railway corridor where impacts have been occurring for decades, and the majority of the wetlands to be affected are of a low to moderate quality, there would be only a small loss of functional values and that loss would be fully mitigated. Public Interest Summary When the seven public interest factors are considered and balanced, the proposed project is not contrary to the public interest. Even if Petitioners’ non-environmental issues are included, the project is not contrary to the public interest. Compliance With Other Permit Conditions The project is capable, based on accepted engineering and scientific principles, of performing and functioning as proposed. The Applicant demonstrated sufficient real property interests over the lands upon which project activities will be conducted. It obtained the required consent for proposed activities relating to bridge crossings over state-owned submerged lands. The Applicant provided reasonable assurance of compliance with all other applicable permit criteria. Exemption Verification for Roadway Crossings The Applicant’s ERP application included a mixture of activities which required an individual permit, as well as activities in roadway crossings which the Applicant claimed were exempt from permitting. Pursuant to section 5.5.3.4 of the Applicant’s Handbook, the Applicant requested a verification of exemption as to certain work to be done within 23 of those 24 roadway crossings. The District determined that the improvements for which an exemption was sought were exempt from permitting under rule 62-330.051(4)(c) for minor roadway safety construction, rule 62-330.051(4)(d) resurfacing of paved roads, and rule 62-330.051(10) for “construction, alteration, maintenance, removal or abandonment of recreational paths for pedestrians, bicycles, and golf carts.” The preponderance of the evidence shows the proposed work qualifies for exemption under these rules.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order that: approves Environmental Resource Permit Modification No. 13-05321-P on the terms and conditions set forth in the District’s Corrected Proposed Amended Staff Report of May 11, 2017; and approves the Verification of Exemption dated March 31, 2017. DONE AND ENTERED this 29th day of September, 2017, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of September, 2017.

Florida Laws (14) 120.52120.569120.57120.573120.60163.3161373.016373.069373.119373.406373.414373.427403.161403.803
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer