RIVER TRAILS, LTD. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 85-000329RX (1985)
Division of Administrative Hearings, Florida Number: 85-000329RX Latest Update: Apr. 08, 1985

Findings Of Fact Petitioner River Trails is the developer of a condominium community in Palm Beach County known as River Walk. River Walk is contiguous to and immediately adjacent to 2600 feet of South Florida Water Management District (hereinafter "SFWMD") property bordering Canal C-18 in Palm Beach County. The right- of-way adjacent to C-18 as well as the bottom of C-18 is owned by SFWMD. C-18 is not in an area designated as Outstanding Florida Waters. As required by Section 403.813(2), Florida Statutes, River Trails sought and obtained on January 12, 1984, a permit from the SFWMD to construct a dock and boat ramp in Canal C-18. The permit conveyed no property rights to River Trails. On October 12, 1984, River Trails asked DER to confirm that River Trails' proposed boat ramp qualified for an exemption pursuant to Section 403.813(2)(c), Florida Statutes. By letter dated December 20, 1984, DER informed River Trails that the proposed boat ramp did qualify for the exemption and, therefore did not require any permit from DER. On October 18, 1984, River Trails asked DER to confirm that River Trails' proposed dock of 1,000 square feet or less qualified for an exemption from DER's permitting authority pursuant to Section 403.813(2)(b), Florida Statutes. However, on November 30, 1984, DER informed River Trails that its proposed dock did not qualify for the exemption because there was already an existing dock on SFWMD property on Canal C-18. As authority for its position, DER cited the following sentence in DER Rule 17-4.04(9)(c), Florida Administrative Code: "A private dock is a single pier at a parcel of property." On the 2600 feet of SFWMD-owned right-of-way contiguous to River Trails, there are presently no docks. On SFWMD-owned right-of-way east of River Trails, between River Trails and the southwest fork of the Loxahatchee River, there are two docks approximately 300 feet apart located in front of single-family residences. DER contends all contiguous property owned by an individual, group or entity, including a water management district, constitutes a "parcel of property" and accordingly does not recognize River Trails' claim to an exemption because of the existence of these docks. Prior to River Trails' request that DER confirm River Trails' right to an exemption, DER had not interpreted water management district-owned right-of-ways to be a "parcel of property" within the meaning of Rule 17- 4.04(9)(c). In the past, the SFWMD has permitted numerous docks of less than 1,000 square feet on SFWMD-owned right- of-ways. Copies of these permits were routinely forwarded to DER. While these docks were and are on right-of-ways which DER now defines as a "parcel" within the meaning of Rule 17-4.04(9)(c), DER has not required permits for these docks. The DER employees who interpret the rule in question as part of their duties and whose depositions were introduced at hearing do not agree on the configuration which constitutes a single pier, on the degree of ownership or control required over a parcel of property by an applicant for an exemption, or on the definition of a parcel of property. DER has failed to adequately explain its deviation from past agency practice in interpreting SFWMD right-of- way as a parcel of property. But for DER's new interpretation of the term "parcel of property" found in Rule 17-4.04(9)(c), Florida Administrative Code, River Trails' proposed dock meets the statutory and rule requirements for an exemption from obtaining a permit from DER.

Florida Laws (5) 120.52120.54120.56120.68403.813
# 1
LAKE POWELL IMPROVEMENT CORPORATION; CAMP HELEN COMPANY; AVONDALE MILLS, INC.; AND GEORGE W. JETER vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-002422RP (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Apr. 19, 1991 Number: 91-002422RP Latest Update: Jul. 19, 1991

Findings Of Fact Lake Powell Improvement Corporation is a consortium of interested owners of land comprising the majority of the Lake Powell shoreline. Camp Helen Company, one of its members, owns lake property which was formerly operated as a recreational facility for associates of Avondale Mills. Camp Helen Company now holds the property for the possibility of future development. George Jeter is one of approximately 76 persons who sent a form letter to the Department of Environmental Regulation (DER) in opposition to the designation of Lake Powell/Phillips Inlet as an Outstanding Florida Water (OFW). The rule-making proceeding to designate Lake Powell/Phillips Inlet an OFW was initiated with a petition filed on June 11, 1987, by the St. Andrews Bay Resource Management Association, a private citizens' organization formed in 1986 to help protect wildlife and resources in the St. Andrews Bay area. A public workshop was conducted by DER on September 6, 1990, in Panama City, Florida. Approximately 70 persons attended the workshop, including Bay County residents, Walton County residents, Lake Powell area property owners and representatives from various organizations. Craig Crockard, Vice President of Lake Powell Improvement Corporation, opposed the designation based on alleged degradation of property values and tax base, negative impact on growth and increase in road maintenance costs. Agency staff encouraged workshop participants and members of the public to submit information, including economic information, that would aid in the decision-making process. Only general and speculative information was received, with the exception of a response from the Department of Transportation that costs of future construction and expansion of the Phillips Inlet bridge, part of four-laning Highway 98, would be increased by $1.5 million as a result of the OFW regulations. DER sent a letter to Craig Crockard, received on April 2, 1991, requesting specifics as to the property owners' development plans and estimated economic impacts by April 5th. Crockard responded that the deadline was too short and that it was obvious that the decision had already been made. At no time, up to and including the hearing before the Environmental Regulation Commission (ERC), did Petitioners or other opponents provide information as to specific economic impacts of the proposed designation. The proposed rule would add the following area to rule 17- 302.700(9)(i), F.A.C. specifying special waters under the OFW designation: Special Waters * * * Lake Powell, Phillips Inlet, and all tributaries to Lake Powell as bounded by the following described line: Begin at the Northwest corner of Section 26, Township 2 South, Range 18 West; thence East to the Northwest corner of Section 29, Township 2 South, Range 17 West; thence South to the Northwest corner of the SW 1/4 of Section 29, Township 2 South, Range 17 West; thence East to the West line of Section 27, Township 2 South, Range 17 West, thence South to the mean high water line of the Gulf of Mexico; thence meander Northwest along the mean high water line to the West line of Section 35, Township 2 South, Range 18 West; thence North to the point of beginning ( - - 91). * * * In making its determination to recommend OFW designation for Lake Powell to the ERC, the Department compared Lake Powell to other water bodies. Lake Powell was found to be exceptionally ecologically and recreationally significant in terms of size, water quality and recreational usage. The Department makes its determination as to whether the proposed water body is exceptional by making direct comparisons to features of other water bodies, and by relying on the professional judgements of others familiar with the particular class of water bodies. Lake Powell has been compared by professionals familiar with other water bodies in the area and in their opinion it has exceptional value as an ecosystem. The Department relied on professional judgement of this type as well as its own findings when making the determination that Lake Powell was exceptional. Lake Powell is located in Bay and Walton Counties in Northwest Florida adjacent to the Gulf of Mexico. Its total surface area of 737 acres makes it the largest by far of any of a series of similar lakes in the area. Seven small streams provide fresh water to the lake; periodically Phillips Inlet, connecting the lake to the Gulf of Mexico, opens or closes. When the inlet is open, the lake becomes estuarine in nature. Most of the shoreline of Lake Powell is still undeveloped and the lake is significant in that it has experienced only minimal adverse impact from human activity. There are no permitted point source discharges to Lake Powell. It is basin-shaped, with a shallow shell, steep sandy slopes, and a flat bottom ranging from approximately 10 to 20 feet deep. Silty, high organic sediments in the water are amenable to degradation and are uniquely sensitive to pollution. Restricted flushing and the opportunity for development growth in the area add to that sensitivity. Lake Powell is a Class III waterbody. Water quality in the lake is good, and meets Class III standards; some parameters are as good as Class II standards. The low dissolved oxygen level in the lake is a result of natural conditions, is not a result of pollution, and is therefore not a violation of the Class III standard for dissolved oxygen. Lake Powell is one of the lakes in the state that is part of the water quality sampling effort known as Lake Watch. A benefit of OFW designation to this effort will be that Lake Powell, absent degradation, can serve as a control lake to compare other Lake Watch lakes throughout the State. At least 170 species of birds, (trust resources of the US Fish and Wildlife Service), have been observed and are dependent on Lake Powell. Unusual species include the piping plover (federally and state designated threatened), snowy plover (state designated threatened), least tern (state designated threatened), and bald eagle (federally designated endangered and state designated threatened). These species have a direct dependence on Lake Powell for habitat, feeding, or nesting areas. They are dependent on non-trust species such as small fishes which could be impacted by chemicals introduced to the lake. Edwin James Kepner, a biologist for the National Marine Fisheries Service, has identified three new species of nematodes which so far have been uniquely found in Lake Powell. Although nematode species are among the most abundant on earth (97,000 individuals may be found in a single rotting apple), they are a highly significant part of an ecological system and must be understood and studied for any understanding of marine communities. The lake supports a diversity of animals. At least 87 species of macrobenthic invertebrates and 67 species of fin fish inhabit the lake, a diversity based on the system's intermittent connection to the Gulf and the lake's relatively pristine condition compared to other lakes. One would expect to find even more diversity, 3 to 4 times more species, if better and more accurate sampling methods were employed. Lake Powell presents a unique nursery area, since most large predator fishes do not have access to it. The lake presently supports a variety of recreational activities, including canoeing, sailing, windsurfing, water-skiing, fishing, crabbing and picnicking. This recreational use has increased during the last five years. Lake Powell is ranked 36th out of 361 lakes statewide in a 1982 study of recreational usage. In terms of potential to the public for recreational usage, Lake Powell has three public access points to the lake, and a possible fourth. Public access is gained by a Bay County public park and by way of Gulf View Drive, which is owned by Bay County and used to launch boats. There is a public dock in Walton County which is also used extensively. The fourth access is currently the subject of an inquiry by the Bay County Audubon Society. The unusual quality of recreational experience lies in the pristine nature of the lake and the fact that it is located not far from the Miracle Strip in Panama City Beach. The ERC Commissioners, who were taken on a tour of the lake, were able to contrast the two areas and found that Lake Powell had unusual recreational value. Lake Powell provides an exceptional educational opportunity, and with its many different types of habitat it is a compact, manageable educational laboratory. As compared to the St. Andrews Bay System it would be much easier to collect samples, obtain information on biotic communities and generally conduct research on the effectiveness of regulatory programs, due to the manageable size of the lake. The proposed amendment to Rule 17-302.700(9)(i), F.A.C., to designate Lake Powell as an OFW would potentially affect future Department permit applicants by requiring they provide the Department with reasonable assurances that the proposed project is clearly in the public interest and that the proposed project would not lower existing ambient water quality standards (Rule 17-4.242, F.A.C.); by requiring that direct stormwater discharges into the lake include an additional 50% treatment level (Rule 17-25.025(9), F.A.C.); and by reducing the exemption for private residential docks from 1000 square feet to 500 square feet (Rule 17-4.04(9)(c), F.A.C.). These requirements will result in increased costs to permit applicants, although the costs cannot be calculated at this time since there are no such projects firmly proposed to the Department. The primary beneficial effect of the proposed rule would be the protection of future water quality based on existing ambient water quality standards at time of OFW designation. Pursuant to Section 120.54(2), F.S., an Economic Impact Statement (EIS) was prepared by the Department. Section 120.54(2)(b), F.S., requires the statement to include: * * * An estimate of the cost to the agency of the implementation of the proposed action, including the estimated amount of paperwork; An estimate of the cost or the economic benefit to all persons directly affected by the proposed action; An estimate of the impact of the proposed action on competition and the open market for employment, if applicable; A detailed statement of the data and method used in making each of the above estimates; and An analysis of the impact on small business as defined in the Florida Small and Minority Business Assistance Act of 1985. Additionally, Rule 17-302.700(4)(e) provides: An economic impact analysis consistent with Chapter 120, shall be prepared which provides a general analysis of the impact on growth and development including such factors as impacts on planned or potential industrial, agricultural, or other development or expansion. It is undisputed that the EIS properly addressed the costs of implementation to the Department. The EIS identified the kind of Department permit applicant that would potentially be affected by the rule amendment, and what kinds of developmental impacts could be expected by operation of other Department rules. The EIS did not identify any specific costs that would be attributable to the rule, as the Department was unaware of any specific development plans for the lake that would be subject to the Department rules. Existing development activities are grandfathered and would not be affected by the more stringent requirements. The Department stated in its EIS that the overall costs imposed on future development due to the proposed OFW designation would depend on both the nature of the development and its impact on the ambient water quality of the lake. Since the type and nature of future development in the area is uncertain, an estimate of the potential aggregate costs associated with the proposed OFW designation could not be made at the time the EIS was prepared. The EIS properly addressed the costs of the proposed rule to the parties, based upon the facts as known to the Department. The benefits to the public of the rule were stated to be largely environmental, as a result of protection of future ambient water quality standards in the lake. The EIS cited an economic benefit to land owners around the lake in the form of enhanced property values due to water quality protections of the OFW designation, water quality being an important variable in determining property values of waterfront property. That property values would be enhanced is based on the DER economist's study of another state's experience and experience with OFW designation in other Florida counties. The EIS properly addresses the benefits of the rule. The EIS states that there will be no significant effect on competition as a result of the proposed OFW designation; Petitioners have not presented any evidence to the contrary. The EIS adequately addresses the rule's effect on competition. The EIS states that the proposed OFW designation is not expected to create any significant adverse disproportionate impacts on small businesses, as required by Section 120.54(2)(b)5., F.S. As Petitioners have not introduced any evidence to the contrary, the EIS adequately addresses this issue. The EIS states that appropriate economic analysis techniques were employed preparing the EIS. Petitioners participated in the rulemaking process; they attended the Panama City workshop when economic information was solicited; they submitted written comments, none of which provided specific economic information; and they participated in the ERC hearing but offered no evidence to the Commission regarding economic impacts of the rule. The type of information they suggest that the Department should consider was not submitted by them, or anyone else, during the rulemaking process or this hearing. The evidence shows that the Department considered all comments submitted throughout the rulemaking process in making the recommendation of OFW designation to the ERC. The EIS properly explains the data and methodology used in its preparation, and this data and methodology was adequate to estimate the economic impacts of the rule. In January 1991, the Bay County Board of County Commissioners amended the County's comprehensive plan to provide special protection for Lake Powell. These provisions include more stringent requirements for stormwater retention and detention, an objective to maintain Lake Powell's water quality at its present level, restriction on use of household septic tanks, designation of a low-density residential zone, and prohibition of point source discharges which would lower existing water quality. (Joint Exhibit #1, Appendix D) Both parties have invoked the plan amendments for their own purpose. Petitioners argue that the plan amendments provide the same or greater protection than the proposed OFW designation and that the designation is not needed. This argument ignores the fact that at least 10% of the lake lies within Walton County, outside Bay County's jurisdiction. DER did not require Bay County to amend its plan and could not require it to maintain the new Lake Powell protections indefinitely. The OFW designation does not detract from or conflict with the local government's commendable initiative, but rather augments it. Respondent, DER, addresses the plan in its modified EIS where it discusses the contention by the Department of Transportation (DOT) that OFW designation will add $1.5 million in costs to widen a road at the Phillips Inlet bridge. DER's economist concedes that designation will result in additional costs and has discussed that in the EIS. Because he has not received back-up data from DOT he is unable to confirm that the cost will be as much as DOT asserts. He also attributes the increase to the new stormwater requirements of the Bay County comprehensive plan, and concludes the additional costs due to OFW designation might be zero. (Joint Exhibit #2, p. 7) Even if misplaced, the attribution of costs does not invalidate the EIS or the proposed designation. The EIS generally describes potential costs and provides a basis to weigh the environmental, social and economic costs against the environmental, social and economic benefits. In summary, the facts above support the ERC's finding that the waters selected for designation are of exceptional recreational or ecological significance and the benefits of designation outweigh its costs.

Florida Laws (6) 120.52120.54120.57120.68403.061403.804
# 2
SIP PROPERTIES LIMITED PARTNERSHIP vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 93-002950RU (1993)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 28, 1993 Number: 93-002950RU Latest Update: Jan. 11, 1994

The Issue The issue in this proceeding is whether four agency memoranda describing policy on mitigation for dredge and fill projects are unpromulgated rules and were relied on by the agency in violation of Section 120.535(1), F.S. During the hearing, and afterwards in writing, Petitioner sought leave to amend its pleadings to incorporate other policies allegedly relied on by the agency in the process of the dredge and fill application review. That request was denied in an order entered on August 23, 1993. Those policies are addressed in the recommended order in DOAH #93-3367.

Findings Of Fact Petitioner, SIP Properties Limited Partnership (SIP) is the record owner of the parcel at issue, approximately thirty-five (35) acres located in the southwest area of Orlando, Orange County, Florida. SIP proposes to prepare the site for commercial and office use by developing the site into separate parcels or lots with proposed uses such as restaurant or fast food establishments, offices and retail stores. Development of the site requires the construction of compensating storage ponds that will act as retention/detention ponds and filling the site. The proposed improvements will result in the filling of 7.47 acres and dredging of 0.42 acres of wetlands claimed to be jurisdictional by DEP. Based on statements made to SIP by staff regarding department "mitigation policies" applicable to SIP's dredge and fill permit application, SIP believed that department policy memoranda were applied during permit review. SIP attached these various memoranda regarding mitigation to its Petition for Administrative Determination of Violation of Rulemaking Requirement dated May 27, 1993, and identified these memoranda as nonrule policies utilized by the department. The department retains on file and makes available for use by its staff the identified memoranda. However, in this case the department did not rely on or apply the mitigation guidelines contained in the memoranda in SIP's Petition. Instead, it applied Part III of Chapter 17-3120, F.A.C. In Part III of Chapter 17-312, F.A.C., the agency has adopted rules addressing the mitigation issues contained in the memoranda in SIP's Petition. For example, the agency has adopted guidelines in rule 17-312.340(2), F.A.C., for applying ratios when mitigation involves creation of state waters, as in this case. The department presently relies on these rules when reviewing mitigation plans, and does not rely on the policy memos referenced in the petition. Determining the mitigation needed to successfully offset impacts from a project is difficult and depends on many factors, including hydrology, soils, planting methods, and monitoring plans. Determining what is needed to reasonably assure successful mitigation must be done on a case by case basis. Not enough is known about the subject to apply any particular set of directions and expect success. DEP is presently in the process of developing rules to further address most aspects of mitigation.

Recommendation Based on the foregoing, it is, hereby, RECOMMENDED: That the Department of Environmental Protection issue its Final Order granting SIP's dredge and fill permit #48-2086169, with the mitigation proposed by the applicant, and establishing an expiration date and monitoring and evaluation plan for determining success of the mitigation as provided in rules 17-312.320 and 17-312.350, F.A.C. DONE AND RECOMMENDED this 11th day of January, 1994, in Tallahassee, Leon County, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of January, 1994. APPENDIX The following constitute specific rulings on the findings of fact proposed by the parties. Petitioner's Proposed Findings 1.-3. Adopted in paragraph 2. 4.-6. Adopted in paragraph 7. 7.-8. Rejected as unnecessary. 9. Adopted in paragraph 8. 10.-11. Adopted in substance in paragraph 9. 12. Adopted in substance in paragraph 10. 13.-16. Rejected as unnecessary Adopted in paragraphs 11 and 12. Rejected as unnecessary. 19.-21. Adopted in substance in paragraph 13. 22.-23. Adopted in substance in paragraph 14. 24.-25. Adopted in paragraph 15. Adopted in paragraph 16. Rejected as contrary to the weight of evidence. Adopted in paragraph 16. Substantially rejected as contrary to the greater weight of evidence. Adopted in part in paragraph 17, otherwise rejected as immaterial. Rejected as immaterial. Adopted in paragraph 18. Rejected as immaterial. The agency witnesses established that the vegetation along the canal evidences the physical connection and there is evidence that water flows from the site into the canal. Rejected as unsubstantiated by reliable competent evidence. Adopted in substance in paragraph 22. 36.-40. Rejected as unsupported by reliable competent evidence. Rejected as immaterial. Rejected as unsupported by the weight of evidence. Rejected as unnecessary, and as to characterization of merely "relic" wetlands, unsupported by the weight of evidence. Rejected (the conclusion of jurisdictional limit) as unsupported by the greater weight of evidence. 45.-53. Rejected as immaterial or unnecessary. 54.-56. Adopted in paragraphs 33 and 34. 57. Adopted, as to the limited function, in paragraphs 22 and 23. 58. Adopted in paragraph 26. 59.-60. Adopted in paragraph 23. 61. Rejected, as to the absolute conclusion of "no function", as contrary to the greater weight of evidence. 62. Adopted in paragraph 25. 63.-64. Adopted in paragraph 26. Rejected as unnecessary. Adopted in paragraph 30. Adopted in paragraph 34. Adopted in substance in paragraph 31. Adopted in substance in paragraphs 30 and 34. Adopted in paragraph 31. 71.-73. Adopted in paragraph 33. 74.-77. Rejected as unnecessary. 78.-79. Adopted in paragraph 31. 80.-81. Adopted in paragraph 35. Rejected as unnecessary. Adopted in paragraph 33. 84.-90. Rejected as unnecessary. Respondent's Proposed Findings Adopted in paragraph 15. 2.-3. Adopted in paragraph 16. 4.-5. Adopted in paragraph 17. Adopted in paragraph 15. Adopted in paragraph 17. Adopted in paragraph 16. Rejected as unnecessary and as to "binding" effect, unsupported by the weight of evidence. Adopted in paragraph 19. 11.-15. Adopted in substance in paragraph 21. 16. Rejected as contrary to the weight of evidence and inconsistent with proposed findings #18 with regard to the constant level in the canal. 17.-18. Adopted in substance in paragraphs 21 and 23. 19.-21. Adopted in paragraphs 19 and 20. 22.-26. Adopted in summary in paragraph 21. Adopted in paragraph 27. Adopted in substance in paragraphs 1 and 2. Adopted in paragraph 2. Adopted in part in paragraph 16. That the forests are "healthy and viable" is rejected as unsupported by the weight of evidence. Adopted in substance in paragraph 17. Adopted in part in paragraph 25; otherwise rejected as contrary to the weight of evidence. 33.-34. Adopted in part in paragraph 27; otherwise rejected as contrary to the weight of evidence. 35.-37. Rejected as contrary to the weight of evidence. 38.-43. Rejected as unnecessary. 44. Rejected as contrary to the weight of evidence. The stormwater management plan and mitigation will restore the stormwater treatment functions. 45.-47. Adopted in substance in paragraph 30. Rejected as substantially contrary to the greater weight of evidence (as to the negative impact). Adopted in part, as to water quality problems generally, but rejected as to the ultimate conclusion, as contrary to the greater weight of evidence. Rejected as unnecessary. 51.-52. Adopted in summary in paragraph 31. 53.-54. Rejected as cumulative and unnecessary. 55. Rejected as contrary to the greater weight of evidence. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Ronald M. Schirtzer, Esquire Martha H. Formella, Esquire R. Duke Woodson, Esquire FOLEY & LARDNER 111 North Orange Avenue, Suite 1800 Orlando, Florida 32801 Douglas H. MacLaughlin, Esquire John L. Chaves, Esquire Rosanne G. Capeless, Certified Legal Intern Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (8) 120.52120.54120.57120.68373.414403.4127.217.47
# 3
ORLANDO CENTRAL PARK, INC.; REAL ESTATE CORPORATION OF FLORIDA, N.V.; AND NATIONAL ASSOCIATION OF INDUSTRIAL AND OFFICE PARKS, REGION IV vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 86-004721RP (1986)
Division of Administrative Hearings, Florida Number: 86-004721RP Latest Update: Mar. 06, 1987

Findings Of Fact Introduction Respondent, South Florida Water Management District (SFWMD or District), is a creature of the legislature having been created under Chapter 373, Florida Statutes (1985). It has jurisdiction over and administers all "waters in the District", including the regulation of the management and storage of surface waters. According to the map depicted in Rule 40E-1.103, Florida Administrative Code, the SFWMD's jurisdiction appears to extend over all of Monroe, Dade, Broward, Collier, Palm Beach, Martin, Lee, Hendry and Glades Counties and portions of St. Lucie, Okeechobee, Osceola, Charlotte and Orange Counties, Florida. A precise legal description of its boundaries is found in Subsection 373.069(2)(e), Florida Statutes (1985). Under the District's surface water management permitting authority, a permit is required for the construction of any works that impound, impede, obstruct or otherwise impact the flow of water, irrespective of whether the property contains a wetland of any nature. To implement the above jurisdiction, the District has adopted by reference in Rule 40E-4.091(1)(a), Florida Administrative Code, a technical manual entitled "Basis of Review for Surface Water Management Permit Application within the South Florida Water Management District" (Basis for Review). The manual was first adopted in 1977 and has been readopted with various modifications since that time. The most recent version became effective in July 1986. The manual contains criteria to be used by the District when reviewing permit applications for the construction and operation of surface water management systems within its jurisdictional boundaries. These criteria specify the manner in which an applicant must provide reasonable assurance that a project meets SFWMD objectives, and include both water quantity and quality considerations as well as environmental standards designed to protect fish and wildlife. One feature of the Basis of Review is a provision allowing an applicant to submit and implement innovative project designs as long as they meet District objectives. Many of the principles embodied in the Basis of Review have been carried forward into the challenged rules. An applicant may apply for a conceptual approval or a construction and operation (C&O) permit. The conceptual approval is a permit for a master plan when the applicant is not ready to submit all detailed drawings necessary to obtain a C&O permit. It is especially appropriate for large projects developed in phases. A conceptual approval does not authorize construction of a surface water management system, but rather authorizes a master plan with which subsequent construction and operation must be consistent. Once a conceptual permit has been issued, the individual C&O permits are then applied for and issued consistent with the terms of the conceptual permit. In 1986 the Legislature enacted Section 373.414, Florida Statutes (Supp. 1986). That section requires the District, not later than March 31, 1987, to "adopt a rule which establishes specific permitting criteria for certain small isolated wetlands which are not within the jurisdiction of the department (of environmental regulation) for purposes of regulation of dredging and filling." The statute goes on to require that the rule include the following: One or more size thresholds of isolated wetlands below which impacts on fish and wildlife and their habitats will not be considered. These thresholds shall be based on biological and hydrological evidence that shows the fish and wildlife values of such areas to be minimal; Criteria for review of fish and wildlife and their habitats for isolated wetlands larger than the minimum size; Criteria for the protection of threatened and endangered species in isolated wetlands regardless of size and land use; and Provisions for consideration of the cumulative and offsite impacts of a project or projects. The statute further provides that until the District adopts specific isolated wetland rules, its review of fish and wildlife impacts in small isolated wetlands is limited to: Wetlands that are 5 acres in size or larger; or Wetlands that are used by a federal or state designated threatened or endangered species; or Wetlands located within an area of critical state concern designated pursuant to chapter 380; or Wetlands that are less than 5 acres in size having a cumulative total acreage greater than 30 percent of the total acreage proposed for development, within a development project greater than 40 acres in size. In response to the foregoing legislation, and after a series of meetings and workshops, on November 7, 1986 the District proposed to amend existing Rules 40E-4.091 and 40E- 4.301, Florida Administrative Code. The text of the amended portion of Rule 40E-4.301 reads as follows: 40E-4.301 Conditions for Issuance of Permits. (1)(m) is not against public policy, and will meet the general and specific criteria in the document described in Rule 40E-4.091(1)(a), and will meet the criteria for isolated wetlands, which are found in Appendix 7 of the document described in Rule 40E-4.091(1)(a) (Underscored words represent the proposed amendment.) In conjunction with the foregoing, the District prepared an economic impact statement (EIS) which read as follows: SUMMARY OF THE ESTIMATE OF ECONOMIC IMPACT OF THE RULE: 1. COST TO THE AGENCY: The proposed rule largely reflects existing policy and procedure but enunciates the specific guidelines the District applies in permitting decisions. The rule strikes a balance between specific quantitative guidelines and administrative flexibility with regard to permitting decisions. While there may be some initial implementation costs to the District, a minimal total cost increase to the agency is expected. The specific quantitative guidelines provided in the Appendix are expected to facilitate agency decisions regarding required mitigation- compensation, so that in the long run costs may actually decline as a result of implementation of the new criteria. There are no plans to change the size of District regulatory staff as a result of implementation of the standards in Appendix To the extend that additional staff is required in the future to address the impacts of permitting decisions on wetland habitat on threatened and endangered species, this impact can more correctly be attributed to the adoption of Section 373.414, F.S., by the Florida Legislature than to this rule. COSTS AND BENEFITS TO THOSE DIRECTLY AFFECTED: Appendix 7 provides the applicant with the choice of either meeting specific quantitative project design criteria or proposing a unique project design which will be reviewed by a qualitative standard to ensure that the proposed project complies with the District's objective of protecting isolated wetlands and their associated fish and wildlife functions and values. The requirements that project applications which proposed to impact wetlands provide reasonable assurances, such as mitigation/compensation, maintenance plans, monitoring and a guarantee of performance, is expected to result in some cost increases to permittees. Such require- ments are likely to improve the effectiveness of District protecting the water and related land resources of the District. IMPACT ON COMPETITION AND THE OPEN MARKET FOR EMPLOYMENT: No significant impact on competition and the open market for employment is expected. IMPACTS ON SMALL BUSINESS: The quantitative criteria in the Appendix set differential standards on the basis of isolated wetland size rather than firm size. Large projects are expected to have slightly greater flexibility in meeting the reasonable assurance requirements than small projects; however, the differential impact on small business, as defined in Section 288.703, Florida Statutes, is not expected to be significant. DATA AND METHODS USED: Data from the computer files of the District's Resource Control Department were the primary source of data used. Appendix 7 adopted by reference in amended Rule 40E- 4.301(1)(o) is a document entitled "Basis of Review for Surface Water Management Permit Applications within the South Florida Water Management District - Appendix 7 - Isolated Wetlands" (Appendix 7). As originally proposed for adoption, the Appendix contained sections 1.0 through 6.0 covering the following subjects: introduction (1.0), glossary (numbered as 2.0 and containing sections 2.1, 2.2, 2.3, 2.4, 2.7., 2.9 and 2.10), size threshold (3.0), review procedures for projects which propose to impact isolated wetlands (numbered as 4.0 and containing sections 4.1-4.5), review criteria (5.0), quantitative design criteria (5.1.1., 5.1.2., 5.1.3, 5.1.4, 5.1.5, 5.1.7 and 5.1.8), qualitative criteria (5.2-5.2.3) and project guarantee criteria (numbered as 6.0 and containing sections 6.1-6.3). For purposes of surface water management permitting, Appendix 7 applies only to activities in isolated wetlands while all other activities are subject to the criteria embodied in the Basis of Review. On November 26, 1986 petitioners, Orlando Central Park, Inc. (OCP), Real Estate Corporation of Florida, N.V. (REC), and National Association of Industrial and Office Parks, Region IV (NAIOP), filed a Petition for Administrative Determination of Invalidity of Proposed Rules wherein they sought to have declared invalid proposed rules 40E-4.091(1) and 40E-4.301(1)(o). In their petition, petitioners generally challenged all or portions of sections 2.0, 3.0, 4.0, 5.0, 5.1., 5.2 and 6.0-6.4 in Appendix 7 as well as the sufficiency of the EIS. In light of the above petition having been filed, the District again considered its proposed rules on January 8, 1987 and amended Appendix 7 in a number of respects. The revised Appendix has been received in evidence as joint exhibit number 2. As a result of those revisions, and as reflected in their post- hearing pleadings, petitioners have limited their attack to sections 2.2, 4.2b, 4.3, 4.4, 5.1.1a, 5.1.1b, 5.1.1d, 5.1.2, 5.1.3 and 5.1.7 in Appendix 7 and the adequacy of the EIS. On January 15, 1987 intervenor/respondent, The Florida Audubon Society (intervenor or FAS), filed a petition to intervene. This petition was granted conditioned upon intervenor proving up at final hearing its standing in the proceeding. Standing In order to challenge a proposed rule, a party must generally demonstrate that its substantial interests will be affected by the challenged rule. To do so, petitioners presented evidence on this issue at final hearing. In the same vein, the standing of intervenor was also questioned, and it too presented evidence to demonstrate its right to have access to this proceeding. REC - REC is the owner and developer of a residential and commercial development consisting of approximately 2,400 acres known as the Buenaventura Lakes Planned Unit Development between Kissimmee and St. Cloud in Osceola County. The project has been subdivided into what is known as Basins 1, 2 and 3, of which the undeveloped acreage lies within the latter Basin. The corporation has plans to develop the remaining acreage into single family and multi-family residential and commercial developments but has not yet obtained the necessary environmental permits for the undeveloped tract. Through the testimony of an REC representative, the undeveloped acreage was described as having open grasslands, wooded areas and low, marshy areas. Some portions of the land were also described as a "wet, marshy, boggy area." However, their specific size was not disclosed, and there was only conjecture on the part of petitioners' expert that the areas were in fact isolated wetlands as defined in the proposed rule. The representative fears that if jurisdictional isolated wetlands are located within Basin 3, and the rules are adopted, it will impact upon REC in that more restrictive permits will be required prior to any further development of the land. The District has previously issued construction and operation permits for Basins 1 and 2 and necessary Department of Environmental Regulation (DER) permits have also been obtained. None have been sought or issued for Basin 3, and there was no evidence that a letter of conceptual approval covering drainage in Basin 3 has been issued by the District. Had one been issued, the project might be grandfathered and exempt from the pending rules. Even so, the record does not support a finding that isolated wetlands as defined in the proposed rule are definitely located within Basin 3 so as to make REC's substantial interest affected by this proceeding. NAIOP - The NAIOP is a national non-profit organization of developers, consisting of some 6,000 members nationwide. In Florida, it has four chapters (Jacksonville, Fort Lauderdale, Orlando and Tampa) and "several hundred" members. As developers of office, industrial and commercial real estate, it is necessary that its members obtain permits from the District on certain projects within the District's jurisdiction. The association monitors all rulemaking proceedings affecting its members, and has actively lobbied the legislature on environmental matters. It has appeared before the District and DER concerning rules and policy, especially those that affect the permitting process. According to an NAIOP representative, Eric B. Eicher, approximately 30 percent of its state members do business in SFWMD jurisdictional territory. However, Eicher had no first-hand knowledge as to how many members owned property within the District, or whether any members are intending to develop isolated wetlands which would be subject to the proposed rule. Indeed, he admitted that only two members had even talked to him about the proposed rules. As such, the NAIOP has not demonstrated any immediate and discernible impact that the proposed rule would have on its members. OCP - The OCP is a wholly-owned subsidiary of Martin-Marietta Corporation, a large corporation with offices in the Orlando area. However, Martin-Marietta is not a party in this proceeding. OCP itself is the owner and developer of an office, industrial and commercial park known as Orlando Center Park in Orange County, Florida. In addition, OCP acts as the developer of certain properties owned by Martin-Marietta. At the present time, OCP has approximately 2,400 acres in its own name which it intends to develop. They are generally located in an area west of the Florida Turnpike, south of Sand Lake Road, north of the Beeline Expressway and east of 1-4. Various aerial photographs and maps of the area were received in evidence as petitioners' exhibits 5, 8 and 9. It is undisputed that this property lies within the territorial jurisdiction of the SFWMD. On November 17, 1977 the District issued a permit granting conceptual approval of a master plan for the development of certain properties owned by OCP. However, the permit itself (petitioners' exhibit 15) did not include a review of impacts on wetlands for OCP's property. Therefore, the project is not grandfathered under proposed rule 4.1, and is subject to the new rules. If the proposed rules are adopted, OCP would have to modify its master plan and reduce the amount of its sellable or developable property. In two jurisdictional determinations performed by DER in 1983 and 1984, DER identified various isolated wetlands on OCP's property not subject to DER jurisdiction. These are located on what are identified as phases 8-B and 9 of the undeveloped tract of land (petitioners' exhibits 8 and 13). Since it is undisputed that OCP intends to develop this land, OCP is substantially affected by the proposed rules. FAS - Intervenor, which supports the rule amendments, is a non-profit association with principal headquarters in Maitland, Florida. Its membership numbers some 30,000, of which a large part live in Southeastern Florida and within the territorial jurisdiction of SFWMD. Although only one member (its president) testified at final hearing, it was the president's contention that "most" of its members support the proposed rules and the perpetuation of the isolated wetland as a function for wildlife. Through documentation offered in evidence as intervenor/respondent's exhibit 1, it was established that FAS owns various tracts of undeveloped land in Lee, St. Lucie and Collier Counties, which lie within SFWMD's boundaries. A part of these lands are isolated wetlands, and other parts are adjacent to wetlands areas. Although FAS expressed a fear that adjacent wetlands may be developed if the proposed rules are invalidated, it offered no proof of impending developments on isolated wetlands, or that such development would occur on properties adjacent to its own. Therefore, any adverse impact is remote and speculative, and has no immediacy or reality. The FAS has entered into a contract with the Game and Fresh Water Fish Commission to administer the Florida Breeding Bird Atlas Program. Under the program, FAS has contracted to establish a baseline of the numbers and types of breeding birds in the State. The FAS fears that if the rule amendments are not adopted, the destruction of wetlands will occur, thereby interfering with its ability to carry out the contract. Again, however, it offered no proof of impending developments on adjacent isolated wetlands, or otherwise established that its substantial interests under the contract would be affected. Economic Impact Statement Other than the introduction of the EIS into evidence as joint exhibit 4, there was no relevant factual evidence presented by the parties concerning the insufficiency or inaccuracy of the EIS. It is noted, however, that the District merely estimated that the proposed rules would "result in some cost increases to the permittees", and did not attempt to precisely identify the economic impact. Respondent offered into evidence various documents upon which it relied in preparing the EIS. However, such documents are hearsay, and it was not shown what competent evidence, if any, they were intended to supplement and explain. The Challenged Rules Petitioners' real concern lies with portions of Appendix 7 which has been adopted and incorporated by reference by Rule 40E-4.301(1)(o), Florida Administrative Code. That document spells out in detail the criteria that will apply to applications for surface water management permits where the proposed activity affects isolated wetlands. As noted earlier, the Appendix is divided into a number of sections, which for ease of discussion will be referred to as "rules." Each challenged "rule" will be dealt with separately. Rule 2.2 - This rule defines an "isolated wetland" as follows: Any wetland not under the jurisdiction of the Department of Environmental Regulation (DER) for the purposes of regulation of dredging and filling. Multiple individual wetlands normally connected by surface flow during a wet season with average rainfall shall be presumed to be an isolated wetland. The first sentence of the rule simply provides that any wetland not subject to DER dredge and fill jurisdiction is to be considered an isolated wetland and subject to Appendix 7 criteria. Conversely, if a wetland is subject to DER jurisdiction, any District regulated activity affecting that land must be considered under the existing Basis of Review criteria. Petitioners' concern is with the second sentence of the rule and is that whenever multiple isolated wetlands are connected by surface flow during the wet season, they believe the rule would confer jurisdiction in SFWMD not only over the isolated wetlands themselves, but also the uplands that lie adjacent to and between the individual wetlands. But, through credible and persuasive testimony, it was established that this is not the intent or result of the proposed amendment. Indeed, it was established that jurisdiction is intended to lie only over the wetlands themselves, and not the connecting uplands. Petitioners also object to the District aggregating small isolated wetlands into a single larger isolated wetland for jurisdictional purposes. However, such aggregation is necessary because of the biological interaction between the small wetlands. Petitioners further voiced some criticism of the provision in the rule that connected wetlands shall be presumed to be an isolated wetland. Even so, the rule allows an applicant to present evidence to contradict this presumption. Finally, despite suggestions to the contrary, there was no evidence of any conflicting DER policy or concept regarding isolated wetlands, how such wetlands are defined by DER, or that DER prefers the District to follow such policy or definition. Rule 4.2b. - This rule prescribes certain information that must be filed by an applicant for a permit whenever the project impacts isolated wetlands. As is pertinent here, Section b. requires the following to be filed with the application: b. A list of all plant and animal species listed as endangered, threatened or of special concern pursuant to 50 Code of Federal Regulations, Section 17.12, and Rules 39-27.03, 39-27.04 and 39-27.05, Florida Administrative Code, which are incorporated by reference and made a part of this rule which utilize the area and an evaluation of the probable significance of the area to the listed species. Petitioners object to the requirement that an applicant submit a list of all plant species of special concern as defined by Rule 39-27.05, Florida Administrative Code. This rule was promulgated by the Game and Fresh Water Fish Commission and designates some forty-three plant "species of special concern". Petitioners' objection is based on the premise that the term "species" does not include plants, and that plant species are accordingly outside the purview of the District's permitting authority. However, they presented no evidence to support this construction of the term. In contrast, through testimony from a National Audubon Society employee, it was established that the term "species" not only includes animals, but plants as well. Mitigation/Compensation Rules - A number of rules within Appendix 7 make reference to mitigation and compensation proposals to be submitted by applicants whose projects impact isolated wetlands. As is relevant here, they include rules 4.3, 4.4, 5.1.1a., b. and d., 5.1.2, 5.1.3 and 5.1.7, all challenged by petitioners. These rules generally require or provide for mitigation when an applicant intends to impact or destroy all non-exempt isolated wetlands 0.5 acre to 5.0 acres in size. It is petitioners' contention that the District has no authority to require or otherwise provide for mitigation or compensation as a permit criterion. Mitigation is defined in rule 2.8 as "remedying isolated wetland impacts by restoring or enhancing affected habitat, or by creating similar habitat of equal or greater function". Compensation is defined in rule 2.9 as the "replacement of isolated wetlands with a mixture of wetland/upland habitat, unique upland habitat, or otherwise provide overall benefits to the natural system". Mitigation is a common practice in environmental permitting and has been routinely used by the District in its existing Basis for Review. Indeed, at the present time ``most'' applicants include a mitigation plan with their applications for permits. Even petitioners' expert conceded that the use of mitigation is "a reasonable practice" and has resulted in "better projects", and "better" protection of the water resources. Rules 4.3 and 4.4 require applicants who propose mitigation or compensation to submit certain information with their applications. This information is necessary to insure that the mitigation/compensation plan will be successful. It is also noted that mitigation is not used or required for every project, and can be avoided where a project has other built-in compensation features. The new rules simply continue existing agency policy. Rules 5.1.1a. and b. provide the following presumptions concerning mitigation and compensation: Mitigation or compensation for elimination of isolated wetlands between 0.5 and 5.0 acres in size, pursuant to Section 5.1.2 below, shall be presumed to maintain wetland functions. There is no presumption that the function of isolated wetlands over 5.0 acres in size can be maintained by measures other than protection as defined in Section 2.4 above. Protection of isolated wetlands over 5.0 acres in size shall be the preferred method of providing the required reasonable assurance, however, other reasonable alternatives proposed by the applicant will be considered. Section a. creates a presumption in favor of the applicant that mitigation or compensation, in ratios specified within the rules, shall be presumed to maintain the functions of isolated wetlands between .5 and 5 acres in size. Section b. eliminates this presumption for isolated wetlands over five acres in size since the District's experience has been that applicants have not generally been successful in mitigating larger wetlands, and that it is more difficult to mitigate and compensate for larger projects. Even so, the rule allows an applicant to present "other reasonable alternatives" to mitigation. Petitioners object to the presumption in Section b. since they contend it reposes in the District the authority to preserve isolated wetlands over 5.0 acres in size. However, this "authority" comes into play only when the criteria cannot be met, and the applicant fails to present "other reasonable alternatives". Rule 5.1.1d. provides as follows: (d) Protection of isolated wetlands or incorporation of isolated wetlands into surface water management systems in favored over isolated wetland destruction and mitigation or compensation. Wetland destruction and mitigation or compensation shall be considered only when there are no feasible project design alternatives for the particular site. Reasonable project design alternatives to isolated wetland impacts shall be considered. This rule essentially favors the protection of isolated wetlands as opposed to their destruction. It goes on to permit destruction and mitigation/compensation whenever there are no "feasible project design alternatives". In other words, the District has established a first priority of preserving wetlands whenever possible, and allowing destruction only when no "reasonable project design alternatives" are available. Under the latter situation, mitigation/compensation will then be required. Petitioners assert the term "feasible project design alternative" is not readily understood, or comprehensible to the average person. However, even their engineer stated he could "apply it", and that he "normally" goes about designing projects consistent with the terms of the rule. It was further established that the District construes the terms "feasible" and "reasonable" to be synonymous, and that the rule would not require an applicant to present a proposal that was prohibitively expensive, or technically unfeasible. Rule 5.1.2 also deals with mitigation/compensation and addresses mitigation ratios to be used by applicants. It reads as follows: Isolated wetland mitigation shall be implemented based upon ratios of acres wet- lands created, or restored to acres of wet- lands destroyed which provide reasonable assurance that the mitigation will be successful. The following ratios shall be presumed to provide such reasonable assurance for type-for-type mitigation: Forested swamp, non-cypress dominated-2. 5:1 Forested swamp, cypress dominated---2.0:1 Freshwater marshes 1.5:1 Ratios for mitigation with unlike habitat, including expanded littoral zones, or compen- sation shall be determined on a case-by-case basis. When type-for-type mitigation is provided as defined in Section 2.8 and accepted by the District prior to isolated wetland impacts, a one-to-one ratio shall be presumed to provide such reasonable assurance. The rule explains that the prescribed mitigation ratios provide reasonable assurance that the creation or restoration will be successful. It is a natural corollary to the District's mitigation/compensation policy. Testimony established that these ratios were reasonable, favor an applicant, and are consistent with the different natural communities to which they apply. Higher ratios of wetlands created to wetlands destroyed are necessary because of the time required for an artificially created replacement system to provide all of the previous native functions. Finally, the use of a one-to-one ratio when type-for- type mitigation is used reduces the amount of land required by an applicant for mitigation, and provides flexibility from the otherwise specified ratios. Rule 5.1.3 prescribes the use of mitigation/compen-sation where disturbed wetlands are impacted by a project. It reads as follows: Disturbed isolated wetlands may be developed and their loss compensated for by: Mitigation at ratios less than those required in 5.1.2, based on the degree of disturbance and the remaining functional qualities. Mitigation through restoration or other disturbed wetlands is preferred over wetland creation. Preservation of unique uplands or in- clusion of developable uplands within an up- land/wetland protected system. Mitigation or compensation shall not be required for isolated wetlands which do not provide fun- ctions and values as expressed above in Sections 1.0 and 5.0. Unlike rule 5.1.2., this rule provides for mitigation ratios based upon the degree of disturbance and the remaining functional qualities of the wetland. It is too is a natural corollary of the District's stated policy. It recognizes that some wetlands have been disturbed, and that the ratios prescribed in rule 5.1.2. are inappropriate and too rigid for a previously disturbed wetland. Rule 5.1.7 - The final rule challenged by petitioners provides for the establishment of "buffer zones" under certain conditions. It is petitioners' contention that, like many of the other cited rules, the District has no authority to adopt the rule because buffer zones in upland areas are not a part of the surface water management system. A buffer zone is defined in rule 2.7 as "an area adjacent to the isolated wetland which protects wetland function and minimizes adverse impacts of upland development on wetland function". The challenged rule reads as follows: Buffer zones may be required around all isolated wetlands that are to be protected or incorporated into a surface water management system to protect wetland function and mini- mize adverse impacts of upland development on wetland function. Actual delineation of the buffer zone may vary according to site specific conditions. Buffer zones which extends (sic) at least fifteen feet landward from the edge of the wetland in all places and averages twenty-five feet from the landward edge of the wetland will be presumed to be adequate. Prior to issuance of Construction and Operation permits, buffer zones shall be field verified and delineated in the field. Buffer zones may consist of undisturbed uplands, open water bodies, wildlife corr- idors or other natural or structural features which serve the purpose stated in Section 2.7 as appropriate for the particular site. Upland areas or wildlife corridors adja- cent to buffer zones may be incorporated as compensation areas, provided they are in excess of the minimum buffer zone and meet all other requirements for compen- sation areas. Under current District policy, buffer zones are required around wetlands whenever they are necessary to maintain the integrity of the wetland. They are a reasonable tool in the District's arsenal to protect water, fish and wildlife resources. Testimony established that they are particularly essential when an applicant proposes to build a project immediately adjacent to a wetland so that erosion or destruction of the wetland may be avoided. The rule merely extends the District's existing policy to isolated wetlands.

Florida Laws (15) 120.54120.5617.12288.703373.016373.023373.044373.069373.171373.413373.414373.416373.426373.6166.08 Florida Administrative Code (2) 40E-4.09140E-4.301
# 4
FLORIDA AUDUBON SOCIETY AND NATIONAL AUDUBON SOCIETY vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT (MARSH GOLF CLUB), 87-005578 (1987)
Division of Administrative Hearings, Florida Number: 87-005578 Latest Update: Aug. 29, 1988

The Issue As stated by the Hearing Officer the issue in this case is whether the District should issue a surface water management permit to Russell E. and Marilyn F. Scott, and Caloosa Television Corporation for the construction and operation of a surface water management system to serve a television signal tower and control building in Southeast Lee County, Florida. There are no significant water resource impacts related to the management of surface water by the proposed project. The harm at issue in this case is the potential for wood storks and other wading to strike the tower and guy wires which are not structures related to management and storage of waters. The parties disagree as to whether the District has jurisdiction to consider the bird impacts related to collisions with the tower and guy wires, and if so, whether the tower and guy wires will have a significant adverse impact on the water resources of the state through a reduction of wood storks, an endangered species, and other wading birds which through feeding on fish remove biomass from such water, thereby maintaining water quality. In determining jurisdiction in this case, the parties disagree on the meaning of "works" and "surface water management system" as used in Chapter 373, F.S. and Rule 40E-4, F.A.C. The petitioners argue that since one set of guy wires will be placed across one end of the cypress wetland located on the subject property, the entire project including the guy wire and tower is a "works" and part of the surface water management system, which is subject to the permitting jurisdiction of the District. The District and respondent Caloosa Television Corporation contend that the tower and guy wires are not structures related to surface water management and are not "works" nor part of the surface water management system, and therefore, bird mortality, as a result of hitting the tower and guy wires, is not subject to the permitting jurisdiction of the District. FINDINGS ON EXCEPTIONS At the Governing Board meeting of October 6, 1988, the petitioners waived Findings of Fact exceptions 1 and 2 of Petitioners' Exceptions to Finding of Fact, Conclusions of Law, and Recommended Order. Therefore, Findings of Fact exceptions 1 and 2 are rejected. The petitioners' exceptions 1, 2, and 3 to Conclusions of Law of the Recommended Order are rejected as set forth in the District's Response To Exceptions Filed by Petitioners filed on September 27, 1988, and attached hereto as Exhibit B and made part of this Final Order. The Governing Board accepts the exceptions filed by the District and the respondent, Caloosa Television Corporation, as set forth herein under Conclusions of Law.

Findings Of Fact On or about September 14, 1987, Caloosa filed Application Number 09147- B, for a surface water management permit, with the District. This application was for the construction and operation of a surface water management system to serve a 1249 foot high television transmission tower and control building in southeast Lee County, Florida. The proposed location of Caloosa's project is approximately one mile north of the boundary of the Corkscrew Swamp Sanctuary, which is owned and operated by Audubon, and specifically, approximately two and one-half miles north of a wood stork colony located within the Sanctuary. This rookery is the largest rookery of wood stork, a federally endangered wading bird, in the United States. The project site is 60 acres in size, and approximately square in shape. It is improved agricultural land, with a circular cypress wetland of about 5.5 acres located near the center of the site. Extending outward from the cypress wetland are two ditches, one running due east and the other due west. The existing surface water flow varies with the seasons and intensity of storm events. During dry seasons, the rainfall runoff flows into the cypress wetland and percolates into the ground. However, during wet seasons, water builds up in the cypress wetland and flows into the two ditches. In larger storm events, the project site is entirely under water, and sheet flows occur to the southwest. The proposed project should have a negligible impact on the existing surface water system since the total impervious area will only be approximately one acre, or 1.7 percent of the total project area of 60 acres. The project consists of a radio tower and guy wires, a 3150 square foot control building, fill pad and parking area, guy wire anchor slabs, and approximately 1650 feet of lime rock road with an equalizer culvert to maintain existing flow. Three sets of six guy wires will extend from the 1249 foot high tower and connect to the ground at anchor slabs located near the edge of the project site. The entire project is located outside of the limits of the existing wetland, but one set of guy wires does cross the western edge of the cypress wetland. Caloosa proposes to use the tower as a "community tower" which will be capable of supporting more than one transmitting antennae. In addition to Caloosa's antennae, the tower will be able to support up to five commercial radio stations and up to sixty two-way communication antennae. Caloosa has had contacts from several commercial radio stations and governmental agencies which have expressed interest in co-locating their antennae on Caloosa's tower. After review of this application, District staff advised Caloosa, on November 23, 1987, that it was recommending approval of the application since it was felt that any impact from the project on wood storks would not result from the construction and operation of this project. At hearing, the District supported the issuance of this permit, but urged that the tower and guy wires are not a part of the surface water management system over which the District has any permitting jurisdiction. Audubon timely filed its request for a hearing on the District's intent to issue this permit, and at hearing opposed the issuance of this permit to Caloosa, urging that the tower and guy wires were an integral part of the surface water management system, and therefore subject to the District's permitting jurisdiction. The wood stork and other wading birds are an important link in the biological and ecological chain. They are the main mechanism for removing certain species of fish from ponds, lakes and waters of the state. If there is no predation by wading birds, then an increase in the biomass of the water system would be expected, water quality would decrease, and fish kills would result. Ponds that receive biomass reduction by wading birds have a reduction in fish biomass of approximately 75%, with no loss in species, while ponds that do not receive wading bird predation lose almost all individual aquatic animals through reduced water quality resulting from retention of up to 94% of the biomass from dead fish. The reduction in biomass is in direct proportion to the number of birds feeding in a pond, and therefore a 5% reduction in birds will result in a 5% lessening of the biomass reduction. Water quality will be reduced by a lowering of oxygen levels in such waters due to the excessive retention of nutrient laden biomass. During the nesting season, wood storks feed in various ponds and wetland areas that surround the rookery. Their primary feeding areas are within ten miles of the rookery. The proximity of these sites allow the birds to make several flights per day between the colony and the feeding site, and to do so with less energy expended than with feeding sites that are farther away. Caloosa's project site is located between the rookery and a primary feeding area to the north that is within ten miles of the rookery. The proximity of this feeding area allows the birds to fly low, at tree top level, to the site, without the use of thermal updrafts that they use to attain altitudes of up to 5000 feet when traveling greater distances. Thus, if the tower is built, it would be likely that wood storks would fly in the direction of, and at the height of, the tower to reach this primary feeding area. However, it was not established how many such birds actually feed in this nearby area, or how many fish are in these ponds and wetlands. The wood stork colony at Corkscrew Swamp Sanctuary has been experiencing a decline in productivity from approximately 6000 nesting pairs in 1960 and 1966, there has been a steady decline in the number of nesting pairs in the colony, and in 1987, there were no nesting pairs in the colony. During 1988, 750 nesting pairs have been observed. The steady decline in the wood stork colony population is the result of already existing developmental pressures and changes in drainage patterns which have adversely affected the birds' feeding habitats. For nesting to be successful, two adult birds are required per nest during the nesting season, which usually occurs from November to March. This allows one adult bird to be away from the nest obtaining food while the other adult keeps the nest warm and safe from predators. If a nest is left unattended through the loss of one adult bird, it is likely that the entire nest will be lost since the fledglings are very vulnerable throughout the nesting season to predators and changes in temperature. There are usually two or three fledglings per nest. For this reason, the loss of five adult birds per year, for example, results in a total loss to the colony of between ten to fifteen fledglings. This loss compounds each year, as birds lost one year are not available to reproduce in following years. Generally, transmission towers can pose a hazard to birds due to the potential for collisions. Illuminating such towers at night does not decrease this danger since the birds are simply attracted to lights. Strobe lighting has also been tried, but it appears that birds ignore, or are not deterred, by strobes. In this case, Caloosa has agreed to accept conditions placed upon the approval of this project by the Lee County Board of Zoning and Adjustments on March 16, 1987, which include placement of aircraft warning balls on the guy wires and the tower itself, habitat improvement including the creation of a wetland and a wildlife through way, if necessary, and commencement of a monitoring system to identify any problems with wood stork mortality as soon as possible. A very extensive study of bird kills and transmission towers was conducted over a thirty year period involving the WCTV tower in Tallahassee, Florida. The WCTV tower was found to kill 3.9 wading birds per year on average. Based in part upon this data, the U.S. Fish and Wildlife Service concluded that wood stork collisions with the tower will not result in significant mortality, and an "incidental take" of five wood storks per year should result. This is a level of mortality which is noteworthy, since any loss to an endangered species is significant, but is clearly below that which would cause jeopardy to the species. Although Audubon correctly pointed out that the conditions present in the WCTV study do not exactly match those present in this case, such as the fact that there are almost three times as many wading birds in the area of the Caloosa tower as were in the area of the WCTV tower, as well as the differences in the geographical relationship of the tower to nearby wading bird colonies and feeding areas, nevertheless, the WCTV study is relevant and should be considered by the District since it is the most exhaustive study of its kind ever conducted. Caloosa presented evidence of a study it conducted over approximately a one month period in May and June, 1988, of a comparable existing radio tower, the WHEW tower, located near the subject property to the east. Although substantial wood stork and other wading bird activity was observed around the WHEW tower, there were no collisions of wood storks with this 1010 foot high tower. While not a scientific study in the strictest sense, and although it was not conducted for as extensive a period as the WCTV study, nevertheless, the District should consider the WHEW study conducted by Caloosa since it involves a comparable tower in close proximity to the subject property, and the person who conducted the study for Caloosa and who testified at hearing, Robert E. Gatton, appeared particularly credible. The Federal Communications Commission has approved the location of Caloosa's tower. I5. The Florida Game and Fresh Water Fish Commission has recommended that the proposed location for Caloosa's tower be changed to an alternate site which would present a less serious obstacle to the Corkscrew wood stork nesting colony and other wading birds. This recommendation is based on the policy that the mortality of even one wood stork is too much and may present a danger to the population of the wood stork rookery. It was not shown, however, that a basis in fact exists for concluding that the loss of five or fewer wood storks per year would present such a danger. The Commission's recommendation is also based upon a concern that transmission towers will proliferate in the area, and thereby further interfere with the flight paths of wood storks and other wading birds to their feeding locations. However, the fact that Caloosa is seeking to construct a "community tower" to be shared with several governmental agencies, as well as broadcasting stations, will actually serve to decrease this potential proliferation. While there is a potential for wood storks or other wading birds in the area to be killed or injured by striking Caloosa's tower or the guy wires while in flight, the extent of this danger is speculative, but would not appear to exceed five wood storks per year. Under these circumstances, there would not be a significant threat to the population, or continued viability, of the Corkscrew rookery. It has not been shown, by the evidence in this record, that any loss of wood storks and other wading birds caused by this project will result in fish kills through a significant reduction of predation and the resulting failure to remove accumulated biomass in ponds and waters in the area. It was not demonstrated that a fish kill will, or is even likely, to occur. While the loss of five wood storks would result in a certain amount of biomass not being removed from the area's wetlands, nothing in the record suggests that this amount will have an adverse impact on the state's water resources or will otherwise be significant. Therefore, any relationship between the tower proposed by Caloosa and impacts associated with biomass accumulation is purely speculative and de minimis. Fish kills occur naturally as water levels in seasonal marshes and ponds lower in the dry season. The water quality impact of such kills is relatively short-lived, lasting up to two months or until the next wet season begins, at which time water quality parameters return to normal. The evidence produced at hearing does not establish that the project and its surface water management system will have any significant or measurable effect on drainage of surface water runoff from the subject property, or on adjacent properties. The drainage system proposed by Caloosa will utilize the existing ditches and the natural cypress pond on the property. It was established that the post-construction effect of the project on drainage would be insignificant. There are, therefore, no drainage impacts associated with this project.

Recommendation Based upon the foregoing, it is recommended that the District enter a Final Order approving Caloosa's application for surface water management permit number 09147-B, subject to the conditions, agreed to by Caloosa, which were imposed by the Lee County Board of Zoning and Adjustment in its approval of this proposed development. DONE AND ENTERED this 29th day of August, 1988, in Tallahassee, Leon County, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of August, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-5578 Rulings on Audubon's Proposed Findings of Fact: 1. Adopted in Findings of Fact 1, 3. 2-3. Adopted in Finding of Fact 4, but otherwise Rejected as a conclusion of law rather than a finding of fact. 4-5. Adopted in Finding of Fact 5, but otherwise Rejected as unnecessary, irrelevant and as a summation of testimony. 6. Adopted in Finding of Fact 2. 7-8. Adopted in Finding of Fact 7. 9-10 Adopted in Finding of Fact 8. 11. Adopted in Finding of Fact 11. 12-15. Adopted and Rejected, in part, in Finding of Fact 12. Adopted in Findings of Fact 8, 10, but otherwise Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 9. Adopted in Findings of Fact 10, 12, but otherwise Rejected as cumulative and as argument on the evidence. Rejected in Finding of Fact 13, and otherwise as simply a summation of the testimony and argument on the evidence. 20-21. Adopted in Finding of Fact 6. 22-23. Rejected in Findings of Fact 15-17. 24. Adopted in Finding of Fact 15. Rulings on Caloosa's Proposed Findings of Fact: Adopted in Findings of Fact 1, 2. Adopted in Finding of Fact 4. Adopted in Finding of Fact 13. Adopted in Finding of Fact 1. Adopted In Finding of Fact 5. Adopted in Finding of Fact 19. Adopted in Finding of Fact 5, but otherwise Rejected as a conclusion of law and as simply a summation of testimony. Adopted in Finding of Fact 16. 9-10. Adopted in Finding of Fact 12. Adopted in Findings of Fact 12, 13. Adopted in Finding of Fact 11. Adopted in Findings of Fact 4, 15. Adopted in Finding of Fact 6. 15-16. Adopted in Finding of Fact 17. 17. Adopted in Finding of Fact 18, but otherwise Rejected as irrelevant and as cumulative. Rulings on the District's Proposed Findings of Fact: 1-2. Adopted in Finding-of Fact I. 3. Adopted in Finding of Fact 2. 4-5. Adopted in Finding of Fact 3. Adopted in Finding of Fact 4. Adopted in Finding of Fact 3. Adopted in Finding of Fact 8. Adopted in Findings of Fact 12, 14, 16. Adopted in Finding of Fact 12. 11. Adopted in Finding of Fact 13. 12. Adopted in Finding of Fact 16. 13. Adopted in Finding of Fact 15. 14. Adopted in Finding of Fact 11. 15. Rejected as irrelevant. 16. Adopted in Finding of Fact 11. 17. Adopted in Finding of Fact 6. 18-19. Adopted in Finding of Fact 5. COPIES FURNISHED: Charles Lee Senior Vice President Florida Audubon Society 1101 Audubon Way Maitland, Florida 32751 Russell P. Schropp, Esquire Post Office Box 280 Fort Myers, Florida 33902 James K. Sturgis, Esquire Post Office Box 24680 West Palm Beach, Florida 33416 John R. Wodraska Executive Director South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416 =================================================================

Florida Laws (4) 120.57373.016373.403373.413 Florida Administrative Code (2) 40E-4.02140E-4.301
# 5
GROVE ISLE, LTD. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-002609 (1981)
Division of Administrative Hearings, Florida Number: 81-002609 Latest Update: May 05, 1982

Findings Of Fact The following findings are based on the uncontested facts alleged in Petitioner's Motion For Summary Recommended Order and from the Final Orders issued in Bayshore Homeowners Association v. Department of Environmental Regulation and Grove Isle, Inc., Case Nos. 79-2186, 79-2324 and 79-2354. On December 29, 1980 DER entered a Final Order on the application of Petitioner for a 90 slip marina in Biscayne Bay, Florida. The Order denied the permit because Grove Isle had not demonstrated that the project is "affirmatively in the public interest" and because the applicant had not demonstrated that it "can meet ambient water quality standards within the project area itself." In the Recommended Order on Remand the Hearing Officer had defined "existing ambient waters" to be the area in the cove between Grove Isle and the Miami mainland. The Final Order rejected that concept and held if any waters others than those contained within the immediate project site were to be considered as ambient, Petitioner must request a mixing zone as part of its application. See Section 17-4.242, (1)(a)2.b. and Section 17-4.244, Florida Administrative Code. By a letter received at the Department of Environmental Regulation on May 20, 1981, Grove Isle reapplied for the boat dock permit which was the subject of the foregoing proceedings. Petitioner's application, which was in the form of a letter from counsel, stated: May 18, 1981 Mr. Larry O'Donnell Department of Environmental Regulation Post Office Box 3858 West Palm Beach, Florida 33402 RE: GROVE ISLE - Application for Boat Dock Dear Mr. O'Donnell: On behalf of Grove Isle, LTD, I am reapplying for the boat dock permit previously applied for by Grove Isle, LTD. Please consider this a short-form application. Your office designated a previous file number, DF 13-7956, to this matter. In conjunction with that application I am applying for a mixing zone, pursuant to Rule 17-4.244, for both the construction and operation of this marina. Please refer to your file on the previous application and incorporate said documents into this reapplication. I am submitting with this application: A scale drawing (one inch = 100') of the proposed facility. (which you have) A certified survey of the proposed mixing zone. (one inch = 100') An application fee of $20.00 A copy of the Final Order issued by Jacob D. Varn, former secretary of DER, on the previous application. A copy of the Notice of Intent previously issued for this project, dated 9/23/79. (which you have) As you will note from reading Mr. Varn's Final Order, he concluded that issuance of this permit was not appropriate inasmuch as the applicant had not applied for nor received a designated mixing zone. We do not necessarily agree with this order and have, in fact, appealed this decision to the First District Court of Appeal. However, in an attempt to keep this matter from becoming any more complicated, we have decided to reapply for the permit and to apply for a mixing zone. We do not concede that a mixing zone should be required for this project or that the facility will result in the release of any pollutants so as to significantly degrade ambient water quality. However, should this project, through its construction or operation, result in the release of any pollutants, I believe they would be limited to: Bottom sediments placed in suspension by the installation of the concrete piles used to support the docking facility during construction; Minimal amounts of oil and grease which may escape from the various vessels moored to the docks; The constituants of anti-fouling paint which may be applied to the hulls of the various vessels moored at the docks. Turbidity will be controlled by the use of curtains during construction. If lowered water quality occurs at all in this project it would only occur within the designated mixing zone, as per Rule 17-4.242 (2)(b) F.A.C. Please advise me should additional information be needed to process this re-application. Yours truly, /s/ KENNETH G. OERTEL On June 19, 1981, DER sent a "completeness summary letter" to Petitioner which requested the following information: Your project is in Outstanding Florida Waters. Please provide the following items demonstrating compliance with Section 17-4.242, Florida Administrative Code. Please demonstrate that this project is clearly in the public interest and that this project will not result in the degradation of ambient water quality beyond the 30 day construction period. Petitioner responded by letter dated June 22, 1981 and which was received at DER on June 25, 1981. Petitioner said in pertinent part: Dear Mr. Duke: If you would check your previous file no. DF-13-7956, I believe you will find all the information you have requested has previously been provided to your office either in that permit file or through the administrative hearings held in pursuit of this application. I think it would be more fruitful if you would communicate with Al Clark, Attorney for DER, with regard to the status of this application. As I do not wish to speak on behalf of Mr. Clark, I believe you should confirm the status of this application with him, particularly in view of our attempt to comply with Secretary Varn's Final Order which suggests the application for this mixing zone. The record reflects no further correspondence between the parties until September 23, 1981 when the Department entered a Final Order Denying Application for Permit. The Order provided that: This project was reviewed previously (DF 13-7956) and was determined not to be clearly in the public interest pursuant to Section 17-4.242, F.A.C. No further evidence upon resubmittal, has been provided to clearly demonstrate that this project is in the public interest. Furthermore, the requested mixing zone exceeds that allowable pursuant to Section 17-4.244, F.A.C. and can be applied only during the construction period, pursuant to Section 17-4.242, F.A.C. During the operation of this facility ambient water quality is expected to be degraded in violation of Section 17-4.242, F.A.C. This order was entered ninety-one days after DER received Petitioner's June 22, 1981 letter.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Department of Environmental Regulation issue the permit applied for by Petitioner, Grove Isle, Ltd. on May 20, 1981 subject to the conditions contained in the Notice of Intent To Issue Permit dated October 23, 1979 which is a part of the record in Bayshore Homeowners Association et al., v. State of Florida Department of Environmental Regulation and Grove Isle, Inc., Case Nos. 79-2186, 79-2324 and 79-2354. DONE and RECOMMENDED this 12th day of February, 1982, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1982.

Florida Laws (2) 120.57120.60
# 6
CLAY ISLAND FARMS, INC. vs. ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 82-002517 (1982)
Division of Administrative Hearings, Florida Number: 82-002517 Latest Update: Oct. 13, 1983

The Issue The issues presented in this matter concern the request by the Petitioner to be granted a management and storage of surface waters permit by Respondent. Respondent proposes to deny the permit based upon the perception that the activities contemplated by Petitioner: (1) are not consistent with the public interest as envisioned by Section 373.016, Florida Statutes, and 40C- 4.301(1)(b), Florida Administrative Code, (2) are not a reasonable and beneficial activity, per Section 40C-4.301(1)(a), Florida Administrative Code, alter the peak discharge rate of runoff from the proposed activity or the downstream peak stage or duration for the 1 in 10 year design storm, per Section 40C-4.301(3)(a), Florida Administrative Code, (4) cause an increase in velocity or flood stage on lands other than those owned, leased, or otherwise controlled by the applicant for the design storm, per Section 40C-4.301(3)(b), Florida Administrative Code, (5) cause an increase in flow or stage such that it would adversely affect lands other than those owned, leased, or otherwise controlled by the applicant, per Section 40C-4.301(3)(c), Florida Administrative Code. 1/

Findings Of Fact A predecessor applicant had requested permission to construct and operate the water management system which is the subject of this controversy. The approximate acreage involved was 197 acres in Lake County, Florida. This acreage and requested activity was subject to the regulatory requirements of St. Johns River Water Management District. Clay Island Farms, Inc., hereinafter referred to as CIF, was substituted for the initial applicant and this matter has been litigated before the Division of Administrative Hearings on the continuing application of the Petitioner. The permit application number is 4- 8089. This application was considered with application number 4-8088, pertaining to property owned by A. Duda and Sons, Inc. Subsequently, the latter application shall be referred to as the Duda request for permit. Certain additional information was sought by Respondent from the applicants, CIF and Duda, in the permit review, by correspondence dated October 2, 1981. A copy of that correspondence may be found as Petitioner's Exhibit No. 16 admitted into evidence. In particular, CIF was requested to prepare pre and post-development runoff rates in the 1 in 10, 1 in 25,and 1 in 100-year storms, to include stage-storage and stage-discharge rates for any and all retention facilities within the project design. Petitioner's Composite Exhibit No. 1 admitted into evidence contains a copy of the engineering report by CIF which are CIF's responses to the request for information. The date of the engineering report is July 12, 1982. The CIF application, as originally envisioned, called for the construction of exterior and interior ditches to be placed around a dike of 71 feet MSL elevation. The dike would enclose a proposed farm operation of approximately 197 acres, should the permit be granted. Within that 197 acre plot, would be found numerous drainage ditches to include major ditches and minor arterial ditches. The purpose of those ditches found in the 197 acres would be to serve as a conveyance for rainfall runoff. The system of conveyance would be connected to an existing conveyance system already in place and related to farm operations of A. Duda and Sons. The runoff would be eventually placed in a retention pond and at times discharged from that retention pond or basin into Lake Apopka by means of gravity flow. The particulars of the development of the 197 acre plot and its service dike, canals, and ditches are more completely described in Petitioner's Exhibit No. 1, which is the engineering report for the surface water management permit application. The CIF application was reviewed by the staff of the Respondent. Recommendation was made to deny the permit. Details of that denial may be found in Respondent's Exhibit No. 1. In the face of the denial, CIF requested an administrative hearing. This request was made on August 27, 1982, by petition for formal Subsection 120.57(1), Florida Statutes, hearing to determine Petitioner's entitlement to the requested permit. St. Johns River Water Management District, in the person of its governing board, determined to refer this matter to the Division of Administrative Hearings to conduct the formal proceeding and the request for the assignment of a hearing officer was received by the Division on September 13, 1982, leading to the final hearing in this cause. During the course of the final hearing, the CIF permit application was modified in a fashion which reduced the amount of acreage sought for cultivation. Now, approximately 122 acres would be farmed per the amended proposal. A general depiction of the design of the project in its amended form may be found in the engineer's sheet, which is Petitioner's Exhibit No. 20 admitted into evidence. When contrasted with the engineering drawings set out in Petitioner's Composite Exhibit No. 1, the new design is essentially the same as contemplated in the original permit application, on a lesser scale. Other than dimensions, the basic concepts of the CIF operation would remain the same under the amended proposal. At present, Petitioner proposes to remove the vegetation which covers the subject 122 acre plot and to conduct a muck farming operation. That vegetation is mostly mixed hardwood with the primary species being red maple. The soil in this area is constituted of monteverde muck, which is conducive to the production of corn and carrots, the crops which Petitioner would plant, to prepare the land for the operation, the system of ditches dikes and canals described would be installed following the cleaning, draining, and leveling of the 122 acres. Petitioner's Exhibit No. 10 admitted into evidence depicts land which has been cultivated and the subject 122 acres in its undisturbed state. Petitioner's Exhibit No. 4 admitted into evidence shows the overall CIF area is outlined in red, except for its southerly extent, which carries a red and yellow line on the exhibit. This exhibit depicts Wolfshead Lake which is a small interior lake in the southeastern corner of the overall CIF property. The yellow line in the middle of the CIF property represents, the location of a former north-south canal. The westernmost north-south reach, which is shown with a red line, depicts a canal which runs north from Wolfshead Lake into the existing Duda system of canals and ditches. The Duda operation has attempted to plug that north-south canal on the western fringe to stop the flow from the area of Wolfshead Lake, but has been unsuccessful and the water still enters the Duda farm ditches and canals. In the 1940's and early 1950's, the CIF property had been partially developed for a cattle operation and truck farming. Those canals, as described before, were installed, together with the diagonal yellow line on Petitioner's Exhibit 4, which represents a canal that was built with an axis running northeast and southwest. In addition, there was a centrally placed east-west canal and a slough running from Wolfshead Lake in a southeasterly direction. The slough is still there, although water that might be diverted from the Wolfshead Lake area into the slough is flowing north in the westerly north-south canal at present. If the project were allowed, most of the water flowing in and around the Wolfshead Lake would be introduced into the slough and from there exit to Lake Apopka. The center north-south canal and the interior east-west canal, together with the diagonal canal, are not in operation at present. The center north-south-canal would become the approximate eastern boundary of the 122 acres with the western north-south canal representing the approximate western boundary of the 122 acre plot. The northern boundary of the CIF property is constituted of an east-west canal which is part of the present Duda system. This is the only one of the canals associated with the former farming operation on the CIF property which is part of any maintained system of conveyances presently in existence. Approximately 1,000 acres are being farmed by Duda and Sons in property north of the proposed project. The Duda permit application, 4-8088 as granted, is described in Petitioner's Exhibit No. 13 which is a copy of the permit. This acreage is generally found to the northwest of the CIF plot, and would allow an additional 300 acres to be farmed in that muck area, on land which has been cleared for the most part and/or which has an elevation predominantly above 68.5 feet MSL. Eighty acres of the proposed Duda permit application was denied based upon the fact that it had not been cleared prior to the Duda permit application and in consideration of the amount of the 80 acre segment which lies below 68.5 feet MSL. The elevation 68.5 feet MSL represents the flood plain for the 1 in 10 year rainfall event for Lake Apopka. The area of the Duda permit is depicted on Petitioner's Exhibit No. 4 and outlined on that exhibit with lines of green and yellow at the southern end, green and yellow and red and yellow on its western flanks, red at the north end and by red on the east side, together with a Duda drainage ditch, which runs north from the terminus of the north-south drainage ditch coming from Wolfshead Lake and the east-west drainage ditch at the northern extent of the CIF property. Exhibit No. 4 was made prior to clearing operations depicted in Petitioner's Exhibit No. 10 and that letter exhibit is a more correct indication of the appearance of the new Duda permit property today. A green diagonal line running northwest and southeast intersecting with a line running east-west and a line running north-south depicts the approximate part of the 80 acres, which lies below 68.5 feet MSL, as shown in Petitioner's Exhibit No. 4. Farm operations, in keeping with the authority of Permit No. 4-8088, have not commenced. If the CIF permit application is successful, the original 1,000 acres, approximately 300 acre area of the Duda permit and the 122 acres of CIF, would be tied in by a system of conveyance ditches or canals allowing the interchange and transport of water through and around the three farm areas. The existing retention pond would be expanded to accommodate the additional farm acreage. The Petitioner is willing to increase the present retention pond to a design capacity which would equal one acre of basin for each ten acres of farm land, at the place in time when all three elements of the muck farm operation were under way. This again pertains to the existing 1,000 acres, the approximately 300 acre recent Duda permit, and the 122 acres related to the CIF application. With the addition of the CIF acreage, when water in the ditches reached 67.1 feet MSL, this would cause the engagement of a 40,000 GPM pump allowing the ditch water influent into the retention pond. The pump automatically would shut off at any time the water level in the access ditches to the pond dropped below 61 feet MSL. The primary purpose of the retention pond is to make water available for irrigation of crops, in its present state, and as contemplated with the addition of the CIF project. The pond does and would detain farm water for a period of about a day allowing the settling out of certain nutrients which are in particulate form. The existing pond and in its expanded form does not and would not filter nutrients which have been dissolved and have become a part of the water column. At times of high incidence of rainfall, when the crops are inundated with water for a 48-hour period of time, the retention pond is now designed and as contemplated by the addition of the CIF farm land, would allow for the discharge of effluent into Lake Apopka through two discharge culverts. The discharge is by means of gravity through an adjustable riser system. The retention pond as presently designed and as contemplated in its expansion has established the height at which water would be released from the retention pond into Lake Apopka through the riser at 68 feet MSL. The occasion of high incidence of rainfall occurs during the normal rainy season in a given year. Discharge could also be expected in the 1 in 10 year, 24hour storm event. During that storm event or design, Lake Apopka would rise to a level of 68.54 feet MSL, a level which would correspond to the 10year flood plain. Whether in the pre or post-development phase of the 122 acres, waters from that acreage would be discharged during the course of the storm through culverts leading from the retention pond into Lake Apopka. This process would continue until the gravity flow stopped at the moment where the water level in the pond and the water level in Lake Apopka adjacent to the discharge culverts achieved equilibrium of elevation. At that point in time, the gravity flow or discharge from the retention basin would cease, there no longer being a positive gradient from the detention pond to Lake Apopka. There will be some amount of discharge in the 24-hour storm event through the culverts at the retention pond either in the pre or post-development phases of the project, because, at present, the western most north-south ditch, which is found at the western boundary of the CIF property, allows water to flow north into the present Duda ditch system, water which has fallen on the 122 acres in question. From the ditch system, that water finds its way into the retention pond and thus into the lake. The contemplated system to be installed with the 122 acres at build-out would also allow water from the 122 acres to go through a system of conveyances and to the retention pond and from there into Lake Apopka. Although considerable testimony was presented by both parties on the subject of comparing pre-development and post-development peak discharge rates of runoff from the proposed activity, in the 1 in 10 year, 24-hour storm design or event, neither party has satisfactorily proven the dimensions of the pre-development and post-development peak discharge rates of runoff from the proposed activity. This determination is made having reviewed the testimony and the exhibits in support of that testimony. Notwithstanding a lack of proof of this differential with exactitude, it has been shown by the testimony and exhibits that the post- development peak discharge rate of runoff in the 1 in 10 year, 24-hour design storm or event can be expected to exceed that of the pre-development rate. On the associated topic of the ability of the post-development design to accommodate the differential in peak discharge rate of runoff between pre- development and post-development, Petitioner has failed to establish this proof. The modeling that was done by the Petitioner, in an effort to depict the differential as 10 acre feet with an available capacity of attenuation approximating 26 acre feet within the system of ditches, is not convincing. Nor has petitioner shown that there is sufficient storage in the retention pond, in the course of the storm event. The data offered in support of Petitioner's position does not sufficiently address accommodation of the drainage from areas surrounding the 122 acres in question, which are not part of the Duda system; the amounts of water already found in the system of ditches and canals at the onset of the storm event; the amount of water located on the crops at the onset of the storm event, which would have to be removed; and the amount of water already found in the retention pond at the time of the storm event. During the 1 in 10 year 24-hour storm, the CIF 122 acres will be protected by the 71-foot MSL dike, in that the expected elevation of Lake Apopka would not exceed 68.54 feet MSL. The dike would also protect the 122 acres in the 25, 50, and 100-year, 24-hour storm events whose elevations are anticipated to be 68.98, 69.28, and 69.56 feet MSL, respectively. As a consequence, an increase in flood stage would occur on lands other than those controlled by CIF. The amount of increase in flood stage would be approximately .046 inches during the 1 in 10 year storm, and an increasingly greater amount for the larger storms. It was not established where the amount of water which could not be staged on the 122 acres would be brought to bear through the surface flow on the 31,000 acres of water which constitute Lake Apopka. Nonetheless, that water could be expected to increase the flood stage on lands other than those of the Applicant. Possibly the dikes protecting the muck farms on the northern side of Lake Apopka could be influenced by the .046 inches in elevation due to the forces associated with the 1 in 10 year storm event, such as winds and movement of the water in the lake. This is true, notwithstanding the fact that the design goal of the dikes in the area is 71 feet MSL. The dikes are constituted of muck and are susceptible to overtopping, erosion, or blowout. By history, there have bean dike failures in the northern end of Lake Apopka, and associated increases in stage or flood stage. This incremental increase in water level in the 1 in 10 year storm event, due to the CIF development, when considered in the context with the other influences of that storm event, could possibly be the determining incident leading to dike failure in the northern perimeter of Lake Apopka. However, given the history of dike failures, prior to this potential loss of the storage area on the applicant's property, it has not been shown that the proximate cause of dike failure in the 1 in 10 year storm could be expected to be the contribution of an additional .046 inches of water on the lake surface. Those failures existed prior to the potential for the addition of water and were the result of inadequate maintenance of a structure which demanded a better quality of attention. Nonetheless, the additional amount of water could be expected to exacerbate the extent of a dike breach in any 1 in 10 year storm event that occurred subsequent to the development of the CIF 122 acres. In summary, the likelihood that the increase in elevation of water caused by the loss of storage on the subject property will be the critical event that causes a dike failure is not accepted. A dike could breach because of the influence of the storm even itself, without regard for the incremental increases in water elevation due to loss of water storage on the CIF property. The poor condition of some dikes due to less than adequate design or maintenance, would promote that dike failure and be exacerbated to the extent of more water being introduced on that property through the incremental amount of increase due to loss of storage on the CIF property. The dike failure circumstance in and of itself would not be sufficient to deny the permit application; however, the applicant had the burden of addressing the possible problem of increases in stage or flood stage on other properties, not its own, which are not protected by dikes. This showing was not made by the applicant, notwithstanding the fact that an increase in stage or flood stage could be expected to occur on property fronting Lake Apopka, which property is not protected by any form of artificial barrier. The installation of the protective dike aground the 122 areas of the CIF property in the 1 in 10 year design storm and potentially at times of lesser rainfall events, could be expected to increase the stage or flood stage on lands unprotected by dikes and thereby adversely affect lands other than those controlled by the applicant. Most of the 122 acres and the property to the east of that development and a portion of the undeveloped 80 acres in the recent Duda permit would be inundated in the 1 in 10 year storm event, prior to development. This is true because the elevation of much of that property is approximately 67.5 foot MSL. During the 1 in 10 year storm event, it would store approximately one foot of water, as presently constituted. It could also be expected to be inundated on an average of approximately once in two years. Lake Apopka is a part of a controlled system of lakes known as the Oklawaha River chain of lakes. Respondent regulates the water level in that chain of lakes by operation of a lock on the Apopka-Beauclair canal. The maximum desirable elevation of 67.5 feet MSL for Lake Apopka is a part of the regulation schedule found in Respondent's Exhibit No. 2 admitted into evidence. In the 1 in 10 year or better storm event, the Apopka-Beauclair system could not draw down the surface water at a rate faster than 27 days per foot, even assuming the lock was fully open to flow. Consequently, those properties that were suffering an, increase in flood stage on their surface could not expect to gain prompt relief through the regulation of waters in the Oklawaha River chain of lakes. Lake Apopka is an hyper-eutrophic lake. Although it is classified as Class III water body (ambient water quality) within the meaning of Section 17- 3.161, Florida Administrative Code, it fails to match that classification in terms of its actual water quality. This is as a consequence of its highly eutrophic state, brought about by the age of the lake and the contributions of man. Some of the contributors to the eutrophication have been removed from the lake area and water quality has improved. Those facilities removed were sewage treatment and citrus processing plants around the Lake Apopka rim. The muck farms remain and the quality of the water in the retention basins or ponds when compared to the receiving waters of Lake Apopka is similar in nature. Consequently, the receiving waters are not enhanced in their water quality when the retention ponds discharge water into Lake Apopka. As stated before, the retention ponds do not have as their primary purpose the treatment of water. Any water quality improvement is a secondary function of the retention pond. The retention ponds do improve the water somewhat, as described, and are adequately sized to fulfill that partial cleansing. Whether the water quality in Lake Apopka would ever improve sufficiently to allow Lake Apopka to become a more diversified habitat for fish and wildlife is not certain, even if all contributing discharges of pollutants were curtailed, to include the discharge of water from the muck farms with its high nutrient loads. Nonetheless, Lake Apopka cannot accomplish the recovery if the effluent from the muck farms continues to be introduced into the lake with the present constituents found in the water. Out of concern for the water quality in Lake Apopka, officials of the University of Florida have conducted experiments on nutrient removal which they hoped would approximate the quality of removal accomplished by transitional vegetation and swamp. (The 122 acres at issue and the western and eastern adjoining property are constituted of these water treatment zones.) This experiment of nutrient removal through use of retention ponds calls for the retention of the muck farm water for a period of six days allowing settlement of particulates and for the vegetation within those experimental retention basins to uptake dissolved nutrients. Several types of vegetation are used to gain a better quality of nutrient uptake add the vegetation is harvested every six to eight weeks to improve that performance. The experiment has shown that the quality of water discharged from the ponds utilized by the University of Florida was comparable in its quality to the natural wetlands system water discharge. The natural wetlands discharge is of a better quality than the receiving waters. Unlike the university experiment, the pond contemplated by CIF primarily emphasizes detention for a shorter period of time than was used in the experiment and allows highly eutrophic water to be mixed with that quality of water already found in Lake Apopka. The only exception to that comment is that water flowing from Wolfshead Lake, which is south of the proposed 122 acres, is a high quality of water, and through the project as contemplated, this water would be directly introduced into Lake Apopka through a flow over a natural wetlands system. This is in opposition to the present situation where the water from Wolfshead Lake flows primarily to the north through an existing canal and is mixed with water from the muck farm and is, therefore, of the eutrophic character as opposed to the high quality character. The Duda permit, which was issued, would allow the introduction of water which is similar in character to the water of Lake Apopka, through the system of ditch conveyances, placement in the retention pond, and at times, flow to the lake. In its effect, the nutrient loading which occurs by introduction of waters from that new farm, would be similar to that proposed in the CIF project. The fact of this similarity does not prohibit the district from evaluating water quality matters on the occasion of the CIF permit decision. Should the 122 acres be converted from natural vegetation to a muck farm, wildlife and fish habitat would be adversely impacted. The habitat provided by the plot is in scarce supply and is essential to the maintenance of a diversified fish population. The hardwood swamp, which is part of and adjacent to the 122 acres of the CIF application, supports benthic invertebrates, which are a food source for game fish. The type of vegetation found in the lake, due to its eutrophic state, is plankton and one of the by- products of the reproduction of that plant through the process and respiration is the destruction of the fish population. This occurs in the summer months. The plankton has replaced the emergent and submergent vegetation which once covered as much as two-thirds of Lake Apopka and now represents .05 percent of the lake. As a consequence, game fish have diminished over a period of years with plankton feeding fish predominating. Consequently, the fish population is less diverse and the removal of the vegetation becomes a significant contributor to the imbalance in fish population.

Florida Laws (5) 120.57373.016373.079373.413373.416 Florida Administrative Code (1) 40C-4.301
# 7
STANDARD SAND AND SILICA COMPANY vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-002154 (1975)
Division of Administrative Hearings, Florida Number: 75-002154 Latest Update: Mar. 21, 1977

Findings Of Fact Application No. 75-00196 is a request by the Standard Sand and Silica Company, for a consumptive water use permit. This application is for an existing use involving withdrawal from one well. The application seeks an average daily withdrawal of 1.6925 million gallons per day and a maximum daily withdrawal of 2.16 million gallons per day. The sought-for withdrawal will not exceed the water crop as defined by the district, with the withdrawal consumptively using only 35 percent of the water crop. The water will be used on site for the washing of sand. Mr. Clifton W. Golden is an adjacent landowner who testified that he was afraid of salt water intrusion and that a sink hole might develop because of the vast quantities of water taken from the aquifer by the applicant. He does not feel that the issuance of a permit would be consistent with the public interest. He presented no hydrological data showing that issuance of the permit would adversely affect his property. Mary Fausteen Thompson is a property owner adjacent to the site from which the water will be taken. She has had problems in the past with Standard Sand and Silica Company apparently discharging excess water on to her property. She thinks those problems may be occurring again, causing some of her property to be flooded. The sought-for consumptive use will not significantly induce salt water intrusion. Except as otherwise noted in the findings of fact, none of the conditions set forth in Subsection 16J-2.11(2), (3) or (4), F.A.C., will be violated. Several letters of objections have been received in addition to the objectors noted above. The Southwest Florida Water Management District's staff recommends issuance of the subject permit in the amounts requested with the following conditions: That no off-site runoff be permitted by the applicant. That flowmeters be placed on the well and quarterly reports made to the district.

Recommendation It is hereby RECOMMENDED that Application No. 75-00196 be granted with the conditions set forth in paragraph 7 above. ENTERED this 28th day of May, 1976, in Tallahassee, Florida. CHRIS H. BENTLEY, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Jay T. Ahern, Esquire Southwest Florida Water Management District P.O. Box 457 Brooksville, Florida 33512 Eugene W. Harris Standard Sand and Silica Co. P.O. Box 35 Davenport, Florida 33837 Mrs. Mary Fausteen Thompson Box 82-C, Evans Road Polk City, Florida Mr. Clifton W. Golden 800 Oriole Drive Virginia Beach, Florida 23451 Mr. John C. Jones Executive Director Florida Wildlife Federation 4080 North Haverhill Road West Palm Beach, Florida 33407

Florida Laws (2) 373.019373.226
# 8
CLIFFORD O. HUNTER vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 93-005924 (1993)
Division of Administrative Hearings, Florida Filed:Live Oak, Florida Oct. 14, 1993 Number: 93-005924 Latest Update: Jun. 08, 1994

Findings Of Fact The Parties. The Petitioner, Clifford O. Hunter, is the owner of real property located at Dekle Beach, Taylor County, Florida. Mr. Hunter's property is located at lot 53, Front Street, Dekle Beach, within section 22, township 7 south, range 7 east, Taylor County. Respondent, the Florida Department of Environmental Protection (hereinafter referred to as the "Department"), is an agency of the State of Florida with responsibility for, among other things, dredge and fill permits involving Florida waters. Mr. Hunter lived in a home on his Dekle Beach property until a storm in March of 1993 destroyed the home. Mr. Hunter's Application for Permit. On or about June 2, 1993, Mr. Hunter applied for a wetland resource permit to rebuild his home, construct a bulkhead and fill 1750 square feet of salt marsh. The permit was designated No. 62-232123-2 by the Department. Mr. Hunter also sought approval for the construction of a dock. The dock, however, is exempt from the permitting requirements of Rule 17- 312.050(1)(d), Florida Administrative Code. On July 21, 1993, the Department issued a Notice of Permit Denial. The Notice of Permit Denial was received by Mr. Hunter. On August 13, 1993, Mr. Hunter filed a Request for Formal Administrative Hearing with the Department contesting the denial of his permit application. The Department's Jurisdiction Over the Proposed Project. The proposed project involves dredging and filling in the waters of the State of Florida. A wetland resource permit is, therefore, required. Wetland jurisdiction of the State of Florida extends to the eastern edge of an existing concrete slab on Mr. Hunter's property from a canal adjacent to Mr. Hunter's northern boundary. The canal connects with the waters of the Gulf of Mexico. The Gulf of Mexico surrounding Dekle Beach, except for an area extending 500 feet outward from the town limits of Dekle Beach, is within the Big Bend Seagrasses Aquatic Preserve. The preserve is an Outstanding Florida Water (hereinafter referred to as an "OFW"). The evidence presented by the Department to support findings of fact 9, 10 and 11 was uncontroverted by Mr. Hunter. Impact on Water Quality Standards. The weight of the evidence failed to prove that the Mr. Hunter has provided reasonable assurances that the proposed project will not lower the existing ambient water quality of waters of the State of Florida. The evidence presented by the Department concerning adverse impacts of the proposed project on water quality standards was uncontroverted by Mr. Hunter. Approval of Mr. Hunter's proposed project would allow the placing of fill in an intertidal area and the elimination of the portion of the intertidal area filled. Intertidal areas help maintain water quality by acting as a filter for water bodies. Mr. Hunter has obtained a variance from the Department of Health and Rehabilitative Services which will allow him to place a septic tank on his property if the permit is granted. The septic tank will leach pollutants. Those pollutants will include nutrients, viruses and bacteria. Because the soil around the septic tank is very saturated, filtering of the pollutants will be low. Pollutants will, therefore, leach into the waters of the State of Florida and adversely impact water quality standards of the canal adjacent to Mr. Hunter's property. Under such circumstances, Mr. Hunter has failed to demonstrate that the project will not lower existing ambient water quality of waters of the State of Florida. Public Interest Test. Mr. Hunter failed to present evidence to support a conclusion that the proposed project will not be adverse to the public interest. Rather, the unrebutted evidence presented by the Department supports a finding that Mr. Hunter's proposed project will not be in the public interest, especially when the cumulative impacts of the proposed project, discussed, infra, are considered. Possible adverse impacts to the public interest include the following: The septic tank which Mr. Hunter will place in the 1750 square feet of filled area will allow fecal coliform, viruses and pathogens to leach into the waters of the canal adjacent to Mr. Hunter's property. Anyone who enters the canal could be infected from bacteria and viruses leaching from the septic tank. The conservation of fish and wildlife would also be adversely affected by the adverse impact on water quality and by the elimination of intertidal area. Recreational value of the canal would be reduced because of the adverse impact on water quality. The proposed project is for a permanent structure. Cumulative Impact. There are a number of applications for permits similar to the application filed by Mr. Hunter which have been filed by property owners of Dekle Beach whose homes were also destroyed by the March 1993 storm. If Mr. Hunter's permit application is granted, the Department will have to also grant most, if not all, of the other similar permit applications. Approximately 20 to 30 other applications involve similar requests which will allow the placement of fill and the installation of septic tanks. The resulting fill and use of septic tanks will have a significant cumulative adverse impact on the waters of the State of Florida. The cumulative impact from leaching effluent from the septic tanks on the waters of the State could be substantial. In addition to the impact on the canal adjacent to Mr. Hunter's property, there will a cumulative negative impact on the ambient water quality of approximately 20 septic tanks on the canals and on the OFW. Errors in the Department's Notice of Permit Denial. The Notice of Permit Denial issued by the Department contained the following errors: An incorrect description of Mr. Hunter's lot number and section number; An incorrect statement that the amount of Mr. Hunter's proposed fill would eliminate 3,200 square feet of marsh; An incorrect statement that Mr. Hunter proposed to fill his lot for a distance of 64 feet waterward. The errors contained in the Notice of Permit Denial did not form any basis for the Department's denial of Mr. Hunter's application. The errors were typographical/word-processing errors. Several notices were being prepared at the same time as the Notice of Permit Denial pertaining to Mr. Hunter. The incorrect information contained in Mr. Hunter's Notice of Permit Denial was information which applied to the other notices. Other than the errors set out in finding of fact 23, the Notice of Permit Denial was accurate. Among other things, it was properly addressed to Mr. Hunter, it contained the project number assigned by the Department to Mr. Hunter's proposed project and it accurately reflected the Department's decision to deny Mr. Hunter's permit application. Mr. Hunter responded to the Notice of Permit Denial by requesting a formal administrative hearing to contest the Department's denial of his application. On December 20, 1993, Mr. Hunter received a letter from the Department which corrected the errors contained in the Notice of Permit Denial. The corrections were also contained in a Notice of Correction filed in this case by the Department on December 20, 1993. The Notice of Permit Denial was received by Mr. Hunter within 90 days after his application was filed. The corrections to the Notice of Permit Denial was received by Mr. Hunter more than 90 days after his application was filed.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a Final Order dismissing the petition in this case and denying the issuance of permit number 62-232123-2 to Clifford O. Hunter. DONE AND ENTERED this 26th day of April, 1994, in Tallahassee, Florida. LARRY J. SARTIN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 1994. APPENDIX The parties have submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. Mr. Hunter's Proposed Findings of Fact Accepted in 1 and 3. Accepted in 2. Accepted in 4. Although Ernest Frey, Director of District Management, Northeast District Office of the Department, did ask Mr. Hunter whether he wanted to sell his property to the State, the evidence failed to prove why Mr. Frey asked this question, that Mr. Frey asked the question in his official capacity with the Department, or that Mr. Frey made the inquiry at the direction or on behalf of the Department or the State. More importantly, the evidence failed to prove that the Department denied the permit sought by Mr. Hunter because of any interest the State may have in purchasing Mr. Hunter's property. See 4. 6-8 No relevant. Not supported by the weight of the evidence. Accepted in 6, 23, 28 and 30. Not a proposed finding of fact. See 8. The "aerial photo, Petitioner's exhibit 6, does not show "No vegetation behind the slab, nearly to the Mean High Water Line . . . ." Respondent's exhibit 3 does, however, show vegetation as testified to by Department witnesses. 13-14 Not supported by the weight of the evidence. Not a proposed finding of fact. Generally correct. Mr. Hunter was not properly put on notice of "alternatives" by the Notice of Permit Denial, as corrected, issued by the Department. Summation: Mr. Hunter's Summation was considered argument and was considered in this case. The Department's Proposed Findings of Fact Accepted in 1 and 3. Accepted in 2. Accepted in 1 and 4-5. Accepted 6-7. Accepted in 8. 6-9 Hereby accepted. Accepted in 12. Accepted in 13. Accepted in 14. Accepted in 15. Accepted in 19. Accepted in 20. Accepted in 15. 17-18 Accepted in 15 and hereby accepted. Accepted in 15 and 20-21. Accepted in 10. Accepted in 22. Hereby accepted. Accepted in 22. Accepted in 12. Accepted in 15-16. Accepted in 17 and 21. 27-28 Accepted in 17. Accepted in 18. Accepted in 13. Accepted in 16. 32-33 The Notice of Permit Denial, as corrected, did not put Mr. Hunter on notice that the alternatives raised by the Department at the final hearing would be an issue in this case. Those alternatives should not, therefore, form any basis for the Department's final decision. Accepted in 24-25. Accepted in 23. Accepted in 25. Accepted in 24 and hereby accepted. Accepted in 26. COPIES FURNISHED: Clifford O. Hunter 1410 Ruby Street Live Oak, Florida 32060 Beth Gammie Assistant General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-9730 Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Kenneth Plante, Esquire General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (3) 120.57267.061373.414
# 9
KISSIMMEE RIVER VALLEY SPORTSMAN ASSOCIATION, INC., AND PHILLIP B. GRINER vs SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 03-003286RX (2003)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Sep. 11, 2003 Number: 03-003286RX Latest Update: Dec. 19, 2003

The Issue The issue in this case is whether Florida Administrative Code Rule 40E-7.523(2)(c) is an invalid exercise of delegated legislative authority.*

Findings Of Fact The Parties 1. The District is a public corporation existing by virtue of Chapter 25270, Laws of Florida (1949), and operating pursuant to Chapter 373, Florida Statutes, and Title 40E-7, Florida Administrative Code, asa multipurpose water management district, with its principal office in West Palm Beach, Florida. 2. KRVSA is a Florida corporation whose members are substantially affected by the rule in question. 3. Phillip B. Griner is an individual who holds a Special Use License to use the Lower Reedy Creek Management Area/Rough Island Management Unit Protected Zone. He has been a member of KVSA since its inception in 1998 and was serving on its board of directors at the time of the final hearing.

Conclusions Based upon the foregoing Findings of Fact and Conclusions of Law, the Petition for Administrative Hearing is denied. DONE AND ORDERED this 19th day of December, 2003, in Tallahassee, Leon County, Florida. Pan ate J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of December, 2003.

Other Judicial Opinions A party who is adversely affected by this Final Order is entitled to judicial review pursuant to Section 120.68, Florida Statutes. Review proceedings are governed by the Florida Rules of Appellate Procedure. Such proceedings are commenced by filing the original notice of appeal with Clerk of the Division of Administrative Hearings and a copy, accompanied by filing fees prescribed by law, with the District Court of Appeal, First District, or with the District Court of Appeal in the Appellate District where the party resides. The notice of appeal must be filed within 30 days of rendition of the order to be reviewed. 31