Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, the Hearing Officer would recommend that no action be taken against the licenses of K. C. Moore as a registered builder contractor. In addition, the testimony at the hearing revealed that subsequent to the institution of this complaint that Dr. 0. Rao, M.D., did make application to the Florida Construction Industry Licensing Board for licensure as a contractor, that his application was approved, and that upon successful completion of the Board's examination he was licensed. If K. C. Moore is in fact guilty of aiding or abetting or knowingly combining or conspiring with a person to violate Part II, Chapter 468, the person with whom he combined or conspired or who he aided or abetted was Dr. John 0. Rao. Although the Board may be limited under the statutory provisions in denying Dr. Rao the license, assuming the Board rejects the Hearing Officer's Conclusions of Law and finds the facts constitute a violation of the statutory provisions, there is an absence of essential fairness to proceed against the licenses of K. C. Moore while licensing the individual with whom he contracted. The disparity in treatment of K. C. Moore and Dr. John 0. Rao is a factor which must be considered by the Board. DONE and ORDERED this 20th day of July, 1977, in Tallahassee, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 R. Stephen Miles, Jr., Esquire Mile and Cumbie Post Office Box 517 Kissimmee, Florida 32741 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner,
Findings Of Fact At all times relevant hereto, respondent, George E. Feld, held certified general contractor license number CG C021801 issued by petitioner, Department of Professional Regulation, Florida Construction Industry Licensing Board. Feld has been a licensed contractor in Florida since June 1982. He has qualified George E. Feld and Associates, Inc. under his license and operates the business at 2131 Northeast 205th Street, North Miami Beach, Florida. After submitting the low bid, on or about March 1, 1985 George Feld and Associates, Inc. entered into a contract with the City of Tamarac to construct a 5,500 square foot recreation building for the City. The negotiated contract price was $195,950. The contract called for commencement of the project within ten days after the contract was signed and completion by July 27, 1985. Sometime prior to March 20, 1985, Feld met one David P. McCall and Marvin Weiss at a motel in North Miami. McCall was interested in doing work on the Tamarac project. He gave Feld a business card with the name "Arrow Head Development Corporation, Inc." printed on it, and which stated the firm was "state certified" and "licensed" as a general contractor. Feld also noted that Weiss held a general contractor's license, and he assumed that McCall and Weiss were working together. Relying on McCall's card, and later representations by McCall, but without checking with petitioner's office to verify if McCall or Arrow Head were licensed or qualified, Feld agreed to subcontract out the shell and sewer work on the Tamarac project to Arrow Head. To this end, Feld and Arrow Head entered into two contracts on March 20, 1985, for Arrow Head to perform the shell and sewer work. On June 21, 1985 McCall submitted a written "proposal" to Feld for the shell work on the job. The proposal had the following words and numbers typed on its face: "State License Number: #CGC 05961." It was not disclosed whose license number this was. Although McCall denied typing this document (because he does not personally know how to type), he did not deny that it was placed on the document at his direction or with his knowledge. It was not until sometime later that Feld learned that Arrow Head was not qualified by any licensee. Because of his mistaken belief that Arrow Head was qualified, Feld had never qualified that firm. Even so, there was no evidence that Feld intended to allow an unqualified firm to perform the work. Work proceeded on a timely basis as required by the contract. Feld visited the job site daily, and supervised all activities, including those performed by McCall. He routinely inspected the work, verified that it was being done according to specifications, and made corrections where needed. The job specifications called for trusses that were over forty feet in length. Because of this, and pursuant to the South Florida Building Code (Code), it was necessary for the City to hire an engineer to oversee their installation. The City hired one George Fink as engineer to supervise this phase of the project. However, Fink's responsibility was limited to just that, and once the installation was completed, Feld resumed responsibility for the remainder of the job. Trusses are a manufactured roof member and may vary in length, height and pitch. In this case, they were designed in the form of a cathedral roof, and were in excess of forty-seven feet in length. Further, because of the building's design, there were a number of trusses to be installed. The installation of the trusses was begun around 9:00 a.m. on Friday, June 27, 1985 and finished by 2:00 p.m. that same day. As required by the Code, Fink was present and supervised the installation of the trusses on the top of the shell. He confirmed at hearing that they were properly installed. The problem herein arose early that day when Fink had noticed that the building plans did not provide for lateral bracing of the trusses. However, according to Fink, this was not unusual since plans do not normally provide for lateral bracing. Even so, Fink told an unnamed person who "appeared to be the fellow running the erection crew" that lateral bracing should be added to the center and two side core members and that the four trusses on each end needed additional bracing. Fink also suggested to this unnamed individual that sheathing be added "as soon as possible" to the top and outside of the trusses to give added stability and protect them from wind damage and the like. In this regard, at hearing Fink conceded that it was "reasonable" for a contractor to erect trusses one day, and to place sheathing on them the following work day. Fink thought sheathing to be particularly necessary on this job since the trusses were high pitched," "long in length," and there were "no gables or anything in between to ... add any other support." By the end of the work day, the crew had placed the proper bracing on the trusses. However, no sheathing was applied. According to Fink, who was accepted as an expert in this proceeding, a prudent and competent contractor would be aware of the need for sheathing and added bracing because of the potential hazard of high winds caused by late afternoon thunderstorms in South Florida. By failing to place sheathing on the roof, Fink opined that Feld was grossly negligent and incompetent in the practice of construction on the Tamarac project. Sometime on late Sunday night or early Monday morning, most of the trusses on the roof collapsed. Some fell on an electrical wire running to the building. However, no injuries occurred. Only five trusses on the north side of the building remained in place. The City of Tamarac then filed a complaint with petitioner against Feld. The cause of the collapse was not disclosed, and even Fink was unable to state that the lack of sheathing was the cause of the accident. There was no evidence that strong winds or thunderstorms occurred on the night the trusses fell, or that bad weather was predicted when the work day ended on Friday afternoon. Feld acknowledged that no sheathing was placed on the trusses. He attributed this to the fact that the construction crew stopped work at 3:30 on Friday afternoon, and did not return to the job site until the following Monday morning. He intended to install the sheathing the following Monday but by then it was too late. This was in accord with the standard enunciated by Fink that it was not unreasonable for a contractor to erect trusses one day, and to place sheathing on them the following work day. Feld also stated that he was well aware of the need for bracing and sheathing on trusses by virtue of his long experience in the construction business. Feld hinted, but did not prove, that McCall may have been responsible for the accident because of bad blood between the two. In any event, he doubted that wind would have caused the trusses in question to fall. Finally, Feld pointed out that, even though city inspectors were present, no one had come to him on Friday afternoon and said the trusses might collapse over the weekend without sheathing. Feld is a graduate of the University of Buenos Aires with a degree in architecture, and has been engaged in the construction/architecture business for twenty-two years. He presently is an instructor of construction at Miami-Dade Community College. There is no evidence he has ever been the subject of a disciplinary action by the Board on any other occasion.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the administrative complaint against George E. Feld be DISMISSED, with prejudice. DONE AND ORDERED this 9th day of April, 1987, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of April, 1987.
The Issue The issue in this case is whether Respondent committed the acts alleged in the Administrative Complaint and if so, what penalty is appropriate.
Findings Of Fact Based upon the testimony of the witnesses and the evidence presented and the entire record in this proceeding, the following material and relevant facts are found. At no time material hereto was Respondent, Donald Clark, licensed by the State of Florida Construction Industry Licensing Board to engage in construction contracting. At no time material hereto was Cancun Development Company ever qualified or certified by any State of Florida agency as a certified contractor. With knowledge of that he was not licensed by the State of Florida to solicit, engage in, nor contract for construction work, Respondent entered into an oral agreement with homeowner Ms. Eichar to build a second-story addition to her home, located in Indian Rocks Beach, Florida, for a contract price of $30,000.00. Respondent, who was paid by Ms. Eichar a total of $25,000.00, subcontracted with Mr. Erwin, a licensed electrical contractor, to do the electrical work at the Eichar's residence for $2,364.00. Respondent, after notice, failed to attend the formal final hearing regarding this matter. The investigative and prosecution costs to the Department of Business and Professional Regulation, excluding cost associated with attorney time, were $550.00.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is recommended that a final order be entered by the Department as follows: Finding Respondent, Donald Clark, guilty of having violated Subsection 489.127(1)(f), Florida Statutes, as alleged in the Administrative Complaint herein filed and imposing as a penalty an administrative fine in the amount of $5,000.00. Assess costs of investigation and prosecution, excluding costs associated with an attorney's time, in the amount of $550.70. DONE AND ENTERED this 23rd day of July, 2002, in Tallahassee, Leon County, Florida. FRED L. BUCKINE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 23rd day of July, 2002. COPIES FURNISHED: Donald Clark 813 East Bloomingdale Avenue Suite 252 Brandon, Florida 32720 Brian A. Higgins, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202 Hardy L. Roberts, III, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-2202
Findings Of Fact At the final hearing the following factual allegations contained in the Administrative Complaint were either stipulated to by the parties or not disputed by the Petitioner: The Respondent John W. Rohrback is a certified general contractor having been issued license numbers CC C002372, CG CA 02372, PM 0015083 and RF 0036563. The last known address of the Respondent Rohrback is 10282 N.W. 31st Street, Coral Springs, Florida 33065. The Respondent Rohrback, while doing business as Statewide Insulation and Solar Systems, Inc., failed to initially obtain building permits which are required by ordinance on the following job sites: Mrs. Blanche Nelson, 454 N.E. 4th Street, Boca Raton. Mrs. Dorothy Menzel, 784 N.E. 71st, Lot 27, Block C, Boca Harbor. Work started May 17, 1980. Permit taken out on May 19, 1980. Mrs. Meinhard, 1230 S.W. 7th Street, Lot 6, Block 29, Boca Raton Square. Work started on May 7, 1980. Permit taken out on May 19, 1980. Ms. Mary Greenhauer, 986 S.W. 14th Street, Lot 20, Block 63, Boca Raton Square. Work started on May 3, 1980. Permit issued on May 19, 1980. Although the Respondent Rohrback eventually received the permits for these projects, he also initially failed to obtain a license to do contracting in the City of Boca Raton as required by ordinance. On or about August 11, 1980, the City of Boca Raton Contractor's Board suspended the Respondent Rohrback indefinitely from doing business in the city for: using alternate materials and methods without clearance; not obtaining building permit; not filing a proper permit; and not filing proper proof of a certificate of competency. At the time of the hearing before the local contractor's board, the Respondent Rohrback had settled and obtained releases with two of the listed individuals. He was told to settle the remaining two cases, obtain releases and appear before the local Board at a later date. The Respondent appeared on the designated date and discovered that the Board had met the previous day and suspended his license. The Respondent Rohrback contacted the Boca Raton city attorney and a representative of the Department to present the signed releases and cancelled checks he eventually obtained from the four listed individuals in order to obtain a reversal of the local Board's action suspending his license. At the time of hearing, the Respondent had been unsuccessful in obtaining a reversal of the Board's decision. Additionally, the Respondent Rohrback acted as qualifying agent for D.R.K. Company from July 1, 1979 through February 1981. During this period of time, D.R.K. utilized deceptive practices in order to obtain contracts from various individuals. By certified letter dated June 12, 1980, the Respondent informed D.R.K. and pertinent licensing boards that he was withdrawing as qualifying agent for D.R.K. and Statewide Insulation and Solar Systems, Inc., and revoking any presigned permits or letters of authorization that may have been signed by John W. Rohrback. However, the Respondent did not actually attempt to revoke his authorization until October 28, 1980, when a letter was sent to Milton Rubin, administrative assistant to the Florida Construction Industry Licensing Board, outlining the problems he had encountered with D.R.K. and Statewide. On or about February 19, 1981, the Lee County Board of County Commissioners suspended the Respondent Rohrback's privilege to pull building permits.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That a Final Order be entered dismissing the Administrative Complaint filed against the Respondent John W. Rohrback in Case No. 82-2616. DONE and ORDERED this 28th day of March, 1983, in Tallahassee, Florida. SHARYN L. SMITH, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of March, 1983. COPIES FURNISHED: Michael J. Cohen, Esquire Suite 101 Kristin Building 2715 East Oakland Park Blvd. Fort Lauderdale, Florida 33306 John W. Rohrback 10282 Northwest 31st Street Coral Springs, Florida 33065 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301
The Issue Whether Respondent aided and abetted an unlicensed contractor to engage in contracting by pulling permits for the unlicensed contractor; whether Respondent failed to qualify a firm for whom he was acting as licensed contractor; whether Respondent acted in the capacity of a contractor other than in his own name; and, whether Respondent violated local building codes as alleged in Second Amended Administrative Complaint filed 6-30-89, and Administrative Complaint filed 7-26-89.
Findings Of Fact At all times relevant hereto, Fred S. Petersen was licensed as a general contractor by the Florida Construction Industry Licensing Board (FCILB) and issued License Nos. CG C023928 and CB CA23929 (Exhibit 1). Neither American Weatherall Industries Inc. (AWI), Mel C. Wyatt, nor Steven C. Wyatt were licensed as contractors by the FCILB (Exhibit 2). Prior to mid-August 1987, Kirk Evenstad was the qualifying general contractor for AWI. By letter dated August 20, 1987, AWI proclaimed Kirk Evenstad to be no longer working for AWI because of mismanagement (Exhibit 3). Mel Wyatt, President of AWI, testified that Everstad had stolen between $30,000 and $50,000 of materials from AWI, leaving AWI in a precarious financial situation. In order to continue in business to work out of the financial hole created by Everstad, AWI, through one of its employees, Danny O'Brien, introduced Mel Wyatt to Respondent. Respondent had known O'Brien for some 20 years and, for the proposed reason of helping O'Brien, Respondent agreed to act as qualifying contractor for AWI. To carry out this project, Respondent entered into a contract (Exhibit 4) or Employment Agreement dated July 31, 1987, in which Respondent agreed to supervise construction of projects contracted for by AWI, but the latter was to provide all material and handle all financial aspects of the contracts. Respondent received $1000 for signing this agreement and was to receive a percentage of the gross proceeds of future contracts entered into by AWI. Respondent authorized O'Brien to pull permits for AWI pursuant to Respondent's contractor's license. Although Respondent testified he gave O'Brien authorization for each specific permit pulled and did not believe he signed Exhibit 11, dated August 11, 1987, a copy of General Authorization for O'Brien to pull permits for AWI under Respondent's license, it is found as a fact that Respondent signed the original of Exhibit 11 which is a copy. Within a short period of time after executing Exhibit 4, Respondent became aware of the financial difficulties facing AWI and ceased his efforts to qualify AWI. In the latter part of 1987 (believed to be November-December), AWI reached the point that it could no longer remain solvent and filed for bankruptcy leaving several contracts unfinished for which AWI had received partial payment. Of the four contracts entered into between AWI and homeowners for additions to their houses (Exhibits 7-9 and 14), all were entered into under a printed document showing Everstad's license number; however, the building permits for Exhibits 7-9 were pulled under Respondent's license. By agreement dated August 10, 1987 (Exhibit 7), Alfred and Marjory Hauk contracted with AWI to convert a garage at their home into an office. Hauk made payments of $1000 and $2300 to AWI, the permit for the work was pulled by O'Brien under Respondent's license, but no work was ever done under this contract. AMI subsequently went out of business, and Hauk received no refund of the monies he had paid to AMI. Hauk never met Respondent. On June 12, 1987, John Davis contracted with AWI to convert an existing garage to bedroom and bath and add a garage to his home. The initial permit for this work was pulled by Kenn Covicc as contractor on June 21, 1987, and a subsequent permit was pulled by O'Brien using Respondent's license. Although Davis paid over $6000 to AWI for this work, the work stopped after the footing for the garage addition was poured. On June 2, 1987, Albert Charette entered into a contract with AWI to add a room to his house. Charette paid some $9300 of the $34,400 contract amount during the progress of the work. Differences arose between Charette and AWI involving whether the construction was being done in accordance with the plans and specifications. In September, 1987, Respondent met with Charette and submitted a proposal (Exhibit 15) to Charette to complete the project in accordance with the plans and specifications. About one week after Exhibit 15 was signed, all work stopped on the project, and Respondent never received compensation or commenced work on this contract, which he had entered into in his own name and not as a representative of AWI.
Recommendation It is recommended that Fred S. Petersen be found guilty of violating Sections 489.129(1)(e), (f) and (g), Florida Statutes, and assessed a monetary fine of $3000. ENTERED this 11th day of June, 1990, in Tallahassee, Florida. K. N. AYERS Hearing Officer Division of Administrative Hearings The Desoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of June, 1990. APPENDIX Proposed findings submitted by Petitioner are accepted, except: Finding #7, penultimate sentence which is rejected as uncorroborated hearsay. Finding #11, that portion stating the purpose of Petersen's visit to Charette was to change the licensure on the permit to Petersen is rejected. See HO #13. Proposed findings submitted by Respondent are accepted, except: Finding #4, Accepted, except with regard to Respondent's notification of termination of his association with AWI. No documentation of this act was submitted and, even though Respondent may have ultimately revoked O'Brien's authority to pull permits, this was done well after the permits were pulled. COPIES FURNISHED: Robert B. Jurand, Esquire G. W. Harrell, Esquire Department of Professional Regulation Northwood Centre 1940 North Monroe Street Suite 60 Tallahassee, FL 32399-0792 Brian A. Burden, Esquire Post Office Box 2893 Tampa, FL 33601 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, FL 32202 Kenneth E. Easley General Counsel Department of Professional Regulation Northwood Centre 1940 North Monroe Street Suite 60 Tallahassee, FL 32399-0792
Findings Of Fact Respondent Henry Huggins is presently licensed by the Construction Industry Licensing Board as a certified general contractor under license number CO C003466. He first received his license in November of 1972 and has since been continuously licensed. His license was however suspended for a period of one year beginning on May 16, 1980. That suspension was by an Order of the Florida Construction Industry Licensing Board. In October of 1981 Mr. Huggins renewed his license on inactive status but changed it to active status in December 1981. His license continued to be active and he is the qualifying agent for Florida Petroleum Services, Inc., in Winter Park Florida. In the fall of 1980 Mr. Albert Dupre agreed to do some home renovation work for Dr. Charles Gill at Dr. Gill's residence located at 2193 Turkey Run, Winter Park, Florida. Mr. Dupre completed the work and shortly thereafter in the spring of 1981 he and Dr. Gill entered into another oral contract whereby Mr. Dupre would construct an upstairs addition to Dr. Gill's home. The addition included the installation of a bathroom and another bedroom. In exchange for these services Dr. Gill "traded off" dental work for Mr. Dupre's wife and agreed to pay an additional $12,000 or $13,000. At Mr. Dupre's request the construction permit for the upstairs addition was obtained by the Respondent Henry L. Huggins. At all times material Albert Dupre has held no contracting licenses authorizing him to individually perform the work called for by his agreement with Dr. Gill. During the time in question, that is April 1981, Respondent did not himself have an active contractor's license due to his suspension by the Construction Industry Licensing Board. He was authorized by the qualifying agent for Roberts Insurance Contractors to obtain building permits under the qualifying agent's license in order to undertake building projects for Roberts. Roberts Insurance Contractors was not a party to the agreement between Dr. Gill and Mr. Dupre for the up stairs addition to Dr. Gill's home. On April 7, 1981 Respondent obtained building permit number 7487 from the City of Winter Park, Florida, which authorized the construction of a bedroom and bathroom addition on the property of Dr. Charles Gill in Winter Park, Florida. Respondent obtained that permit on behalf of Mr. Dupre because of their friendship and their previous business associations dating back to the mid- 1970's Respondent did not supervise or otherwise participate in the construction of Dr. Gill's addition until the work was complete and Dr. Gill made a complaint to several regulatory bodies about Mr. Dupre's work. This complaint centered around the earlier air conditioning project; but once notified that there were difficulties concerning the project, Respondent, along with Mr. Dupre, completed all unfinished items and corrected all defects. As a result of Respondent's willingness to remedy those defects Dr. Gill has requested that all charges against Mr. Huggins here be dropped.
Recommendation Based on the foregoing Findings of Fact and Conclusions Law, it is RECOMMENDED: That the Construction Industry Licensing Board enter a Final Order suspending the license of Henry L. Huggins as a certified general contractor for a period of two (2) years from the date of the Board's Final Order. DONE and RECOMMENDED this 17th day of February, 1984, in Tallahassee, Florida. MICHAEL PEARCE DODSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9673 Filed with the Clerk of the Division of Administrative Hearings this 17th day of February, 1984.
Findings Of Fact The Respondent is a certified general contractor holding license number CG C016888. The Petitioner is an agency of the State of Florida charged with enforcing the provisions of Chapter 489, Florida Statutes, regulating the licensure and practice status and standards of building contractors in the State of Florida and enforcing the disciplinary provisions of that chapter. On December 14, 1981, Respondent contracted with Mr. and Mrs. Frank J. Sullivan to build the Sullivans a home in Sarasota County, Florida. Those parties entered into a contract whereby the Respondent was to be paid the actual cost of construction including all labor and materials plus a commission in the amount of 8 percent of the actual cost of construction, provided however, that the total contract price would not exceed $49,000, including actual costs and commission. In January, 1982, Respondent commenced work constructing the home. The Respondent worked on the home for several months and then abruptly ceased and abandoned construction without explanation on May 14, 1982. At this time the house was approximately 70 percent complete. At the time the Respondent ceased work on the project he had already been paid $47,362.29 or approximately 97 percent of the total contract price agreed to by the parties. The Sullivans thereafter had to pay $10,633.53 to subcontractors and materialmen who had been hired by the Respondent to supply labor and/or materials to the house, at the Respondent's direction, prior to his ceasing construction and leaving the job. Additionally, the Nokomis Septic Tank Company, Inc., the subcontractor who installed the septic tank, was owed $1,180.07 by the Respondent for the installation of the septic tank, which amount was to have been paid out of the total $49,000 contract price. The Respondent failed to pay Nokomis Septic Tank Company, which then filed a mechanic's lien on the property. In order to remove this cloud on their title to the property and avoid foreclosure of the lien, the Sullivans were forced to pay the $1,180.07 amount of the lien. In addition to more than $10,000 paid to subcontractors who had already performed labor or supplied materials to the job before the Respondent left it, the Sullivans had to obtain a loan from their bank in order to finish the project. The contracted for items which the Respondent had left undone (approximately 30 percent of the construction) required them to expend $18,662.04 to complete the dwelling in a manner consistent with the contractual specifications. The items which remained to be constructed or installed are listed on Petitioner's Exhibit 7 in evidence. The remaining amount of contract price which the Respondent was due upon completion of the job would have been $1,737.71. With this in mind, as well as the fact that the Sullivans had to pay in excess of $10,000 to defray already outstanding bills to subcontractors for labor and materials already furnished and then had to obtain a loan in order to pay $18,662.04 in order to complete the house, and it being established without contradiction that the Respondent was unable to make his payroll at the point of leaving the job, the Respondent obviously used substantial amounts of the funds he received from the Sullivans for purposes other than furthering the construction project for which he contracted with the Sullivans. Concerning Count II, on December 22, 1981, Frederick Berbert doing business as Venice Enclosures of Venice, Florida, contracted with Mr. Emory K. Allstaedt of Grove City, Florida, Charlotte County, to build an addition to Mr. Allstaedt's mobile home. The contract specified a price of $4,952 for which Berbert was required to construct a 12-foot by 20-foot enclosure or porch. Mr. Allstaedt never did and never intended to contract with the Respondent, Mr. Martin, rather, his contract was only with Frederick Berbert. Mr. Berbert was a registered aluminum specialty contractor in Sarasota County. He was not registered or licensed to practice contracting in Charlotte County where Mr. Allstaedt lived and where the porch was to be constructed. On December 28, 1981, the Respondent obtained building permit number 72030 from the Charlotte County Building and Zoning Department to construct a "Florida room" for Mr. Allstaedt's mobile home, the same room to be constructed by Mr. Berbert. Under Charlotte County Ordinances in evidence as Petitioner's Exhibits 13 and 13A, only a properly licensed "A", "B" or "C" contractor or a registered aluminum contractor can perform this type of job. The Respondent was appropriately licensed for this type of work in Charlotte County, but Mr. Berbert was not and thus could not obtain the permit in his own right. The Respondent's only connection with this job was obtaining the permit in his own name as contractor of record and in performing some minor work in replacing some damaged sheets of paneling shortly after the construction of the room addition and after the performance of the contract by Berbert. Though the Respondent listed himself as contractor in order to be able to obtain a building permit for the job, he never qualified as the contractor of record nor "qualified" Mr. Berbert's firm with the Construction Industry Licensing Board. Both Mr. Berbert and the Respondent were aware that Mr. Berbert could not legally perform contracting in Charlotte County at the time the Respondent obtained the building permit on Berbert's behalf.
Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence of record and the candor and demeanor of the witnesses, it is, therefore RECOMMENDED: That the contractor's license of Jack A. Martin be suspended for a period of ten (10) years, provided however, that if he makes full restitution to the Sullivans of all monies they expended for labor, materials and permits to enable them to complete the work he had contracted to perform, within one year from a final order herein, that that suspension be reduced to three (3) years after which his license should be reinstated. DONE and ENTERED this 27th day of April, 1984, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of April, 1984. COPIES FURNISHED: Charles P. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Jack A. Martin 305 Park Lane Drive Venice, Florida James Linnan, Executive Director Florida Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred M. Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are made: At all times material to this proceeding, Respondent Joseph W. Miklavic was licensed as a certified building contractor in the state of Florida, holding license number CB C006615, qualifying Security Home d/b/a Security Homes of Clearwater (Security). Since March, 1989 the Respondent's license has been on active status qualifying, Individual. At all times material to this proceeding, Respondent was a salaried employee of Security. Ronald MacLaren was president of Security and also sole owner and president of Yankee Construction Inc. d/b/a Olympic Homes of Citrus County (Olympic). In accordance with a management agreement between Security and Olympic, the Respondent was assigned by Ronald MacLaren to oversee the operation of Olympic. Olympic was licensed to engage in construction having been qualified by Wilmon Ray Stevenson through license number RB A035005 which was in effect from June, 1987 until October, 1988 when Stevenson filed a change of status application with the Construction Industry Licensing Board (Board) requesting license number RB A035005 be changed to inactive status qualifying, Individual. While this application was not acted upon until February, 1989, the Board considered license number RB A035005 in effect as qualifying Olympic only until October, 1988. Effective September 26, 1988, the name of Yankee Construction, Inc. was changed to Rivercoast Homes, Inc. (Rivercoast) which apparently ceased doing business under the fictitious name of Olympic Homes of Citrus County. On September 19, 1988 Wilmon Ray Stevenson advised the Citrus County Building Department that he was no longer the "qualifier for Olympic Homes". Around this same time, the Respondent, Ronald MacLaren and the management of Olympic became aware that Stevenson would no longer be the qualifying agent for Olympic. There was no evidence that Rivercoast Homes, Inc. a/k/a Yankee Construction Inc. ever advised the Board of the name change or the termination of Stevenson as its only qualifying agent affiliation in accordance with Section 489.119(2)(3), Florida Statutes. Nor was there any evidence that Rivercoast was ever qualified by another qualifying agent pursuant to Section 489.119, Florida Statutes. In accordance with the agreement between Security and Olympic, referred to in Finding of Fact 4, the Respondent continued to oversee the Rivercoast operations until sometime around December 1988 when all of MacLaren's operations in Florida, including Security, closed down. Under Security's agreement with both Olympic and Rivercoast, Respondent's duties included working with management and subcontractors to develop construction schedules and to advise Ron MacLaren of the financial aspect of the company so that MacLaren could make funds available to pay subcontractors, etc. Respondent did not have any control over the finances of either Olympic or Rivercoast such as receiving, depositing or disbursing funds. Either in late September or early October of 1988, Respondent approached Larry Vitt, Citrus County Building Department, as to whether the Respondent could pull permits under his license for Olympic or Rivercoast. Vitt advised Respondent that unless he qualified the company he could not pull permits for that company under his license. Respondent advised MacLaren that Rivercoast would have to have a qualifying contractor in order to engage in contracting. MacLaren did not get Rivercoast qualified to engage in contracting at anytime. Respondent did not qualify Rivercoast under his contractor's license at anytime. Sometime around the last of September or the first part of October of 1988, Respondent became aware that Rivercoast a/k/a Yankee Construction, Inc. was no longer qualified under Section 489.119, Florida Statutes, and therefore, not authorized under law to engage in contracting. On August 16, 1988 Ernest and Marjorie Ellison met with Ken Smith and Gloria Stevenson of Olympic to discuss Olympic building the Ellisons a home. The Ellisons picked out a floor plan at this time and gave Olympic a $100.00 deposit to hold the price until a contract could be executed. On October 1, 1988 the Ellisons met again with Ken Smith and was introduced to the Respondent who gave them a brief run down on the status of the company and advised them that the company was in "good shape". At this meeting, Ken Smith advised the Ellisons of certain things that were required of them before construction began, including a survey. On October 31, 1988 the Ellisons signed a contract with Rivercoast to construct their home. In his capacity as a representative of Security, under the agreement between Security and Rivercoast, the Respondent signed this contract on the line designated Contractor/Representative. There is insufficient evidence to show that Respondent intended to sign the contract as contractor of record as the term contractor is defined in Section 489.105(3), Florida Statutes (Supp. 1988), and thereby impose upon himself the responsibility for the entire project. The contract price was $44,634.00. On November 1, 1977 the Ellisons delivered to Rivercoast a check for $4,363.40 which along with the $100.00 deposit paid in August represented a total down payment of $4,463.40. Respondent did not personally receive any funds from the Ellisons for Rivercoast or receive any funds for himself from the Ellisons under this contract. No permit was ever pulled or any work performed by Rivercoast under the aforementioned contract. Ernest Ellison met with Respondent on November 21, 1988 and requested that the contract be cancelled. Under the authority granted Respondent through the agreement between Security and Rivercoast, the Respondent and Ernest Ellison signed the contract as being cancelled on November 21, 1988. Although the Ellisons were offered an opportunity by the Respondent to transfer their deposit of $4,463.40 to Security and enter into a contract with Security to build their house, they declined and contracted with another contractor. On the date the contract was cancelled, Respondent advised Ernest Ellison that the down payment of $4,463.40 would be reimbursed. Although Respondent attempted to obtain a refund for the Ellisons from MacLaren and was advised by MacLaren that a refund was forthcoming, no refund of the Ellison's down payment was ever made by Rivercoast, Ronald MacLaren, the Respondent or anyone else. Respondent was aware during the negotiation and at the time the Ellison's contract was executed, that Rivercoast was not authorized by law to engage in contracting. However, there is insufficient evidence to show that Respondent ever advised the Ellisons that he would be the contractor responsible for building their home under the contract with Rivercoast or that he would be the contractor to pull the necessary permits for construction of their home. There is no evidence that Respondent had any financial interest or owned any stock or held any office in Rivercoast a/k/a Yankee Construction, Inc. Around October 1, 1988, after Stevenson had withdrawn as qualifying agent for Olympic, Rivercoast was no longer authorized to engage in the practice of contracting since it had not been qualified by another qualifying agent in accordance with Section 489.119, Florida Statutes.
Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence of record, the demeanor of the witnesses and the disciplinary guidelines set out in Chapter 21E- 17, Florida Administrative Code, it is RECOMMENDED: That the Board enter a final order finding Respondent guilty of violating Section 489.129(1)(e), Florida Statutes, and for such violation it is recommended that the Board assess the Respondent with an administrative fine of $1,000.00. It is further recommended that Counts I, II, IV and V be dismissed DONE and ORDERED this 27th day of November, 1990, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of November, 1990. APPENDIX CASE NO. 90-2046 The following constitute my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Rulings of Proposed Findings of Fact Submitted by the Petitioner Not necessary. Adopted in Finding of Fact 1. Adopted in Finding of Fact 7 but modified. Adopted in Findings of Fact 4, 8, and 10. Adopted in Findings of Fact 9 and 14 but modified. Adopted in Finding of Fact 15. Adopted in Findings of Fact 16 and 17 but modified. Adopted in Findings of Fact 17 and 18. Rulings of Proposed Findings of Fact Submitted by Respondent 1. - 2. Not material or relevant. Adopted in Findings of Fact 1, 7 and 20. Adopted in Finding of Fact 4. Adopted in Findings of Fact 4 and 8. Not material or relevant. Adopted in Finding of Fact 19. - 10. Adopted in Finding of Fact 15. Restatement of testimony not a Finding of Fact but see Finding of Fact 13. Adopted in Finding of Fact 15. Not material or relevant. Adopted in Finding of Fact 15. - 16. Not material or relevant. Restatement of testimony not a Finding of Fact but see Findings of Fact 13, 14 and 15. Adopted in Finding of Fact 19 but modified. Not material or relevant. Adopted in Finding of Fact 4. Restatement of testimony not a Finding of Fact but see Finding of Fact 4. Adopted in Finding of Fact 9. Adopted in Finding of Fact 4 but modified to show license effective until October, 1988 rather than February, 1989. Restatement of testimony not a Finding of Fact but see Findings of Fact 1, 7 and 20. - 26. Not material or relevant. Adopted in Finding of Fact 4 but modified to show from June, 1987 until October, 1988. - 29. Adopted in Findings of Fact 5 and 13. Restatement of testimony not a Finding of Fact but see Finding of Fact 4. - 32. Adopted in Findings of Fact 4, 8 and 9 but modified. Not material or relevant. - 36. Adopted in Findings of Fact 4, 8, and 9 but modified. Adopted in Finding of Fact 10. Not material or relevant. - 40. Adopted in Findings of Fact 8, and 17, respectively. Rejected as there is no substantial competent evidence in the record to show any other contract than the one Respondent signed on October 31, 1988. Not material or relevant. Not supported by substantial competent evidence in the record. Not material or relevant. Adopted in Finding of Fact 18. Restatement of testimony not a Finding of Fact but see Finding of Fact 9. - 50. Not necessary to the conclusion reached since this matter was covered in the Preliminary Statement wherein the motion was denied. COPIES FURNISHED: G. W. Harrell, Senior Attorney Department of Professional Regulation 1940 N. Monroe Street, Suite 60 Tallahassee, FL 32399-0750 Geoffrey Vining, P.A. 2212 South Florida Avenue Suite 300 Lakeland, FL 33803 Daniel O'Brien, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, FL 32202 Kenneth D. Easley, General Counsel Department of Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792
The Issue At issue herein is whether or not the Respondent/Licensee, Tomas Perez, d/b/a Lifetime Chemicals of America, Inc. (Lifetime), engaged in conduct which will be set forth hereinafter in detail, which warrants the Florida Construction Industry Licensing Board (Board) to take disciplinary action respecting his license and to impose an administrative fine based on said alleged conduct.
Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, the arguments of counsel and the entire record compiled herein, the following relevant facts are found. Tomas Perez, d/b/a Lifetime Chemicals of America, Inc. (Respondent), is a certified general contractor who holds license No. CGCA 04170, which is active. On September 24, 1975, Mr. Perez used his license to qualify Lifetime Chemicals of America, Inc., as the entity through which he would conduct his business activities (Petitioner's Exhibit 1). On August 15, 1978, Lifetime Chemicals of America, Inc. , entered into an agreement with James Laughery of Fort Myers, Florida, for a franchise agreement to use Lifetime's license in the immediate area of Fort Myers, Florida (Petitioner's Exhibit 5). That agreement provides, among other things, that Respondent Lifetime authorized James Laughery to use its license in the Fort Myers area for a fee of $50.00 per job or $1,500.00. The agreement does not provide, nor was any evidence offered to establish that Respondent Perez played any supervisory or managing role in agent Laughery's contracting activities in the Fort Myers area. During October of 1978, Mr. Andrew Szarfran entered into an agreement with Respondent's agent, Laughery, to perform certain roofing repairs to his residence for the sum of $1,000.00. Mr. Szarfran paid Laughery $500.00 and Laughery abandoned the project prior to completion (Testimony of Szarfran and Petitioner's Composite Exhibit 4). Mr. Szarfran engaged the services of another contractor to complete the project. On May 17, 1979, the Lee County Construction Board reviewed a complaint filed against Respondent by the Szarfrans. Based on that review, the Lee County Construction Board revoked Respondent's licensing privileges in the county at its June, 1979, meeting (Petitioner's Exhibits 3 and 4 and testimony of witnesses Richard M. McDole and Maxine Allred, Administrative Director of Court Enforcement and Permit Clerk, respectively, for Lee County). On or about October 17, 1978, Respondent's agent, Laughery, also entered into an agreement with Mr. and Mrs. Arthur Swanson for the erection of aluminum siding to the exterior walls of their residence for a full price of $5,000.00. The Swansons gave Respondent's agent, Laughery, a downpayment of $2,500.00 and agent Laughery abandoned the project prior to the commencement of any work (Petitioner's Exhibits 7 and 8 and testimony of Mrs. Swanson). Richard Newmes, the chief inspector for building and zoning, Cafe Coral, Florida, testified that the Construction Industry Licensing Board for Cape Coral, Florida, revoked Respondent's contractor license on January 17, 1979, based on his violation of Cape Coral Code Section 5-1/2 - 21(J), to wit: "Failure to make good faulty workmanship or materials performed or installed to evade performance of the contract or specifications as agreed upon." (Petitioner's Exhibit 9.) On or about January 4, 1979, Lifetime Chemicals of America, Inc., became aware of its agent, James Laughery's mismanagement of funds and his failure to honor contractual obligations he had entered in the Fort Myers area. Respondent and its agent Laughery therefore entered into an agreement which rendered the franchise agreement between the parties null and void. Agent Laughery, in said agreement, promised to pay, from his commissions due, monies owed to Lifetime Chemicals, Inc., which apparently was brought about due to the restitution that Lifetime Chemicals had made to customers whom agent Laughery had defaulted. As mitigating evidence, it was noted that the Respondent, Tomas Perez, was not party to or familiar with the activities and/or difficulties that the designated agent for Lifetime Chemicals of America, Inc., James Laughery, was encountering in the Fort Myers vicinity before early January, 1979. As soon as Respondent became aware of Laughery's problems, steps were immediately taken to halt such acts insofar as they related to Respondent (Testimony of Tomas Perez and Michael Arfaras).
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law and the mitigating evidence which revealed that although the Petitioner is authorized and in fact holds the qualifier license of a registered entity responsible for the acts of its agents, in view of the undisputed evidence which reflects that neither Respondent Perez or Respondent Lifetime Chemicals of America, Inc., in any manner benefited from the acts of its agents and in fact attempted to thwart the illegal acts of its agent as soon as such became known, it is hereby RECOMMENDED: l. That the Respondent, Tomas Perez's Certified General Contractor's license, CGCA 04170, be placed on probation for a period of one (1) year. 2. That the Respondents, Tomas Perez and Lifetime Chemicals of America, Inc. , be issued a written letter of reprimand. RECOMMENDED this 24th day of April, 1980, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of April, 1980. COPIES FURNISHED: Barry Sinoff, Esquire 2400 Independent Square Jacksonville, Florida 32202 Tomas Perez 2395 West 12th Avenue Hialeah, Florida 33010 Michael Harold Arfaras 820 S.W. 20th Avenue Miami, Florida 33135 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. CASE NO. 79-2173 THOMAS PEREZ, CGCA 04170 Respondent. /