Findings Of Fact Petitioner, William Burke, is the developer of the Countryside Retirement Resort, a proposed development of regional impact, (DRI), located in DeSoto County, Florida. Sunrise Farms, a Florida general partnership, is the owner in fee simple of the site, but is not a party in this matter. Respondent, DeSoto County Board of County Commissioners, is a local government with jurisdiction over the proposed project site. It is responsible for the administration of the DeSoto County Comprehensive Plan, land development regulations, and zoning code. On August, 15, 1990, after a duly-noticed public hearing, the Board of Commissioners of DeSoto County denied Burke's Application for Development Approval and Request for Rezoning. On April 23, 1991, the Board of Commissioners of DeSoto County, pursuant to Chapter 163, Florida Statutes (1989), and the rules promulgated thereunder, adopted its current comprehensive plan. Intervenor, Department of Community Affairs, is the state land planning agency with the power and duty to enforce and administer Chapter 380, Florida Statutes, and the rules and regulations promulgated thereunder. The Department is also authorized to appeal DRI development orders issued by local governments pursuant to Section 380.07, Florida Statutes, and has demonstrated a substantial interest in the outcome of this proceeding. Intervenors, M. Lewis Hall, Jr., M. Lewis Hall, III, Don T. Hall, Frank D. Hall and Steven V. Hall, are landowners near the subject site, and are substantially effected persons. The proposed site of the project is located on Highway 31, approximately ten miles from the City of Arcadia, at the SW 1/4 and W 1/2 of the SE 1/4 of Section 1, Township 39 South, Range 25 East, DeSoto County Florida The project has been named Countryside Retirement Resort (Countryside), and is a proposed PUD intended as an Adult Residential Community which is designed to contain, at build-out, a maximum of 1440 park model residential homesites and 60 transient RV spaces on approximately 239.71 acres. The 1440 permanent park model resort homes are to be offered as a "turn-key" package to insure architectural control and adherence to project design. Park model homes are prefab, factory-built units, which are not susceptible to being moved again. The units in each phase will have a single bedroom, and the estimated price for all phases is $55,000, including the lot and lot preparation. Gross density for the project is 6.0 and 6.25 units per acre, based upon 1440 (park model homes) and 1500 (including 60 RV spaces) units, respectively. The development is privately funded and includes all streets, utility systems, public safety services, community buildings, recreational facilities, and general community amenities. The project area is currently zoned A-5 or improved pasture agricultural, with one dwelling unit per five acres permitted. To the north, the property is zoned A-10, citrus grove agricultural. To the south, the property is zoned improved pasture-agricultural, A-5. The Petitioner proposes to dedicate the 40 feet along the South side of the property to DeSoto County for street purposes. Adjacent to the public dedication will be a 40 foot project buffer for fencing, landscaping, and stormwater containment. The main entrance is to be located at State Road 31, approximately 1,000 feet North of Pine Island Street. Turn lanes are to be provided to minimize any potential detriment to the flow of traffic on the state roadway. As requested by County staff, forty feet of additional right-of-way has been set aside for the future widening of Pine Island Street. In addition to the 40 foot right-of-way for Pine Island Street (approximately 3.66 acres), access and improvements at all intersecting streets will be made. The additional traffic, sewer and potable water impacts will be provided for by the developer. A secondary access from Pine Island Street runs east from SR 31 approximately two miles, and dead ends at the Hall Ranch. The adjoining 40 foot buffer strip features, in addition to security fencing, a perimeter drainage swale and earthen mounds with landscaping that will screen the community from the public roadway. The buffer strip is not intended for future road purposes. The 40 foot buffer will be placed around the perimeter of the site. The buffer will consist of earthen berms and landscaping to protect the community from the outside, and the outside from the community, to make it as self-supporting and self-contained as possible. A 6.5 acre tract in the southwestern corner of the site has been reserved to provide for the commercial institutional needs of the residential community. Anticipated commercial uses include a general store (providing food, hardware, and dry goods), personal service shops, professional office space, and a motel (58 units) with a restaurant. Institutional uses include an arts and crafts building, a volunteer fire station equipped with a "quick response" vehicle, and office space for use by the sheriff's office, a second floor residence apartment for the community manager, the project's water treatment plant, and a helipad for emergency medical services. A general utility area, including maintenance building, the wastewater treatment plant, and a dry storage area for boats and RV's will be located in the Southeast corner of the property, buffered from adjoining properties and from the internal community. The project will also feature an 18 hole executive golf course with a pro shop and aquatic driving range, a multi-use clubhouse, four lighted tennis courts, six neighborhood swimming pools, and a series of mini-parks. The Petitioner's intent is to design the resort to function as a relatively self-contained and readily identifiable neighborhood of the County. The project calls for an on-site sewage treatment plant with tertiary filtration attached to the plant. At build-out, the plans call for the plant to treat approximately 315,000 gallons of sewage per day. A total of 8.99 acres of both man-made and natural wetlands were identified on the site. The project complies with applicable regulations with respect to preservation of wetlands. Approximately 27.75 acres of wetlands are to be created, and approximately 22.95 acres of proposed lakes will exist at completion. The project conforms with applicable regulations with respect to water use. The project's drinking and irrigation water will be served from on-site wells. An on-site water treatment plant will also be built. Adequate provisions are made for hurricane shelters and evacuations measures. The project conforms with applicable regulations with respect to air emissions. The project conforms with applicable regulations with respect to vegetation and wildlife. The entire site is cleared of natural vegetation and managed as improved pasture. The project site as well as adjoining land is not unique agricultural land. The project will not significantly deplete the agricultural community adjacent to the project or in the general neighborhood. Estimates from 1982 indicate that 236,722 total acres of pasture exist in DeSoto County. Removal of the project site from cattle production represents a total of .097% of the total pasture acreage in the County. Approximately 96% (230 acres) of the existing site is improved pasture land for cattle grazing while 6.9 acres or less than 3% of the project's site covers wet prairie. No natural wildlife corridors exist between the subject parcel and any surrounding natural lands. There are no significant historical or archeological sites or corridors considered likely to be present within the project area. Approval of the project would add to the tax revenue base of DeSoto County. The DeSoto County landfill is designed to meet the needs of the County until the year 2000 based on its projected increase of population. The proposed project at buildout, prior to the year 2000, falls below the projected increases of population. The projected increase in population by the year 2000 ranges from 4300 to 5800 with the proposed project generating a theoretical maximum increase in population of 3,000 persons if all units were occupied on a year round basis. The landfill will have adequate capacity to meet the demand from the project. No unusual or industrial or hazardous wastes will originate on-site. A 1.75 acre site has been reserved for the sewage treatment plant in the Southeast corner of the subject property. Sludge is scheduled to be disposed of by a licensed hauler. A tertiary wastewater treatment plant is to be provided in all phases of development. The wastewater is to be filtered and highly disinfected to provide treatment effluent for irrigation purposes. The plant will be situated on approximately 3/4 of an acre including surrounding open space and buffer areas. The utility site is of sufficient size to provide treatment of waste water for the entire development. All on-site facilities (collection treatment) are to be operated and maintained by the homeowner's association in accordance with the Florida Department of Environmental Regulation operating permits. On-site treatment and disposal facilities are being proposed that will be capable of serving the entire development. The proposed drainage system for the project is consistent with applicable regulations. The water supply system proposed for the development complies with applicable regulations. Florida Power and Light Company has sufficient capacity to provide electrical service to the project. While the project will contribute property taxes to the educational system, the development will not have a negative impact on the DeSoto County District School System, since this project will be an adult community, and no school-age children are contemplated. 94.18 acres, or almost 40% of the development site, are to be devoted to recreation uses and open space. A helipad will be constructed to enhance MedVac emergency services to the project and the surrounding area. DeSoto Memorial Hospital is licensed for 82 beds, and provides emergency services. DeSoto Memorial Hospital is a community not-for-profit facility, serving the DeSoto County area and located in Arcadia, Florida. Health Care and medical services are available at the Hospital and the Arcadia area to meet the needs of the Countryside residents. The county operated ambulance (EMS and ALS certified) offers 15 to 20 minute response time from its headquarters station on State Road 70, a distance of 7 miles, via SR 31. Fire protection services for the project are to be provided by the public safety department of DeSoto County. The nearest fire station is located at State Road 70 and Airport Road about seven miles north of the property. Under normal traffic conditions, response time is estimated to be approximately 10 to 12 minutes. The county's fire protection services are to be enhanced by the construction of an auxiliary fire station on-site. The Petitioner proposes to develop a volunteer fire department from among the residents of the project with emphasis on fire, emergency medical, quick response fire truck and a building for sheltering in the event of a disaster or potential emergency (portable electric, water, restrooms, kitchen and proper square footage to accommodate the residents of the development) would serve as a benefit to the County on SR 31. On April 23, 1991, the Board of County Commissioners for DeSoto County adopted Ordinance 91-03, a new comprehensive plan for the County. Included are goals, objectives and policies in the Future Land Use Element of the Plan. The Future Land Use Element, Goal L. Objective L2 of the DeSoto County Comprehensive Plan, provides that: Development orders and/or permits for future development and redevelopment activities shall be issued only if public facilities necessary to meet level of service standards, adopted as part of the Capital Improvements Element of this Plan, are available concurrent with the impacts of development. The Future Land Use Element, Policy L2.5 of the DeSoto County Comprehensive Plan, provides that: No local development order or permit will be issued unless the County determines that the appropriate level of service standards can be met for: drainage; potable water; recreation and open space; solid waste disposal; traffic circulation; and waste water treatment. Traffic Circulation Element, Goal T of the DeSoto Comprehensive Plan, provides that the goal of the traffic element of the Plan will be to "provide for a safe, efficient and economical traffic circulation system." To implement Goal T, Objective T1 provides that, "DeSoto County shall provide a safe and efficient transportation system, and shall establish minimum criteria and standards to ensure the effective functioning of all public roadways within its jurisdiction." The proposed development site accesses State Road 31, a north/south, two-lane minor arterial roadway connecting the City of Arcadia with the City of Fort Myers. SR 31 is currently at a Level of Service (LOS) of B, or better. The DeSoto County Comprehensive Plan, Policy T1.1, has established a peak season/peak hour level of service standard of D or better for SR 31. The Five- Year Schedule of Capital Improvements in the DeSoto County Comprehensive Plan does not provide for the improvement of SR 31. The average daily traffic maximum volumes established by the Department of Transportation for a LOS D on a minor arterial, such as State Road 31, is 15,000 trips per day. Four separate traffic studies were performed regarding the potential impacts of the proposed development on State Road 31. The first two studies were performed by Mr. Gordon Meyers of Ink Engineering, Inc., the third by Mr. Richard Doyle of Tampa Bay Engineering, Inc., and the fourth by Ms. Nanette Hall of Florida Transportation Engineering, Inc. The study area included segments of SR 31 and the intersection of SR 31 and SR 70, as well as, SR 31 and SR 760-A. SR 70 runs east-west and expands from a two lane roadway to a four lane major arterial at the intersection of SR 70 and SR 31. CR 760-A is a two-lane rural major collector extending westerly from SR 31, just north of the G. Pierce Wood Memorial Hospital, to US 17, which provides access to the Punta Gorda area and Interstate 75. The Department of Transportation has three traffic counting stations on State Road 31 from which reliable traffic data has been collected since 1984. The location of these traffic counting stations are as follows: Station #26, is located just south of the intersection between State Road 31 and State Road 70; Station #4, is located approximately halfway between the site of the proposed development and State Road 70, north of the intersection between State Road 31 and County Road 760A; Station #31, is located south of the intersection between State Road 31 and County Road 760A, and north of the proposed site of the proposed development. All four studies made projections as to the anticipated increase in traffic volume at these stations should the proposed development be approved. The four traffic studies obtained the following projections for the anticipated traffic volumes and corresponding LOS's that would exist at the traffic counting stations upon build out of the proposed development summarized in the table below: LOCATION FIRST STUDY SECOND STUDY THIRD STUDY FOURTH STUDY (MEYER) (MEYER) (DOYLE) (HALL) Station #31 12,474/LOS D 7,610/LOS C 12,474/LOS D 13,466/LOS D Station #4 13,557/LOS D 9,250/LOS C 10,080/LOS D 15,384/LOS E Station #26 15,172/LOS E 9,380/LOS C 10,341/LOS D 17,111/LOS E Of the four traffic studies performed, the projections of the fourth (Hall) study were the most reliable. It was the only study to use historic data available on State Road 31 in the Calculation of a growth rate for background traffic volume, and did not suffer from the methodological flaws that existed in the other studies. The fourth (Hall) traffic study indicated that the proposed development at build out would cause large sections of State Road 31 to exceed its level of service established by the DeSoto County Comprehensive Plan, and reduce the level of service below D. The fourth (Hall) study also projected the traffic impacts of the proposed development if developed in two phases, the results (expressed in average daily traffic and peak hour/peak season impacts) of which are summarized in the table below: LOCATION PEAK HOUR/PEAK SEASON AVERAGE DAILY TRAFFIC PHASE I PHASE II PHASE I PHASE II Station #31 892/LOS C 1,394/LOS D 9,062/LOS C 13,466/LOS D Station #4 1,033/LOS D 1,544/LOS E 10,732/LOS D 15,384/LOS E Station #26 1,183/LOS D 10,341/LOS D 12,397/LOS D 17,111/LOS E Countryside has never requested phased approval for the project. The fourth (Hall) traffic study indicated that even if approval were given for "Phase I" alone, a major portion of the LOS D capacity of the roadway (approximately 80% to 85% of the capacity) would be used up, reducing the possibilities for further development of those sections of State Road 31 between the proposed development and State Road 70. The proposed development will not meet the appropriate level of service for traffic circulation. Land Use Element Policy L6.8 of the DeSoto County Comprehensive Plan provides that: Residential development in a Rural/Agricultural area shall not exceed a maximum density of one dwelling unit per ten gross acres. In a Rural/Agricultural area, the lowest order of commercial goods and services which serve the daily needs of nearby residents may be permitted only on arterial or collector roadways. Commercial areas in a Rural/ Agricultural area shall be appropriately buffered, shall not exceed 3 acres in size, shall not exceed impervious surface lot coverage of 70 per cent, and shall be no less than 2 miles from other commercial development in a Rural/Agricultural area or in other future land use categories. Industrial uses within a Rural/Agricultural area may be permitted only when such activity is related to the extraction or processing of minerals; or when related to agriculture; or is of a scale and nature that would not be acceptable in Town Center. Other industrial uses, such a power plants or manufactured or processing facilities may be permitted, and shall have access to a collector or arterial roadway, shall meet all local regulations, and shall be appropriately buffered from surrounding land uses, including agricultural uses. Within a Rural/Agricultural area, the approval of residential development shall acknowledge that the protection of agricultural lands is a primary function of a Rural/Agricultural area, and that land management activities associated with agricultural uses may be incompatible with residential development. However, such management activities are considered to be an essential element of the protection of successful operations on agricultural lands and the continuation of such activities shall take precedence. Future Land Use Element, Goal L. - Objective L3 of the DeSoto County Comprehensive Plan, provides that "DeSoto County shall promote compatible future land use patterns." The current DeSoto County Comprehensive Plant, Future Land and Use Element, Objective L6, provides: Objective L6: As a part of this plan, DeSoto County's Future Land Use Map series shall be applied only in conjunction with the policies of this element and other elements of the DeSoto County Comprehensive Plan, and shall generally illustrate and coordinate the appropriate distribution of residential, commercial, industrial, agricultural, preservation, public and utility facility land uses to effectively manage the projected population growth of the County. The Future Land Use Map (FLUM) and the Plan's policies are used to effectively manage the projected population growth of the County. The Countryside project is not depicted, in terms of an appropriate land use category, on the FLUM. The Future Land Use Map indicates that the project site is located in an R/A (Rural/Agricultural) land use designation with a maximum allowable density of one residential unit per ten acres. The density of the proposed project is in excess of six dwelling units per acre. The 1991 DeSoto Comprehensive Plan, data and analysis section, indicates that there are 2,765 approved, unconstructed recreational vehicle (RV) sites in nine undeveloped, but approved RV parks, covering 448 acres. The Plan indicates that these approved RV sites will meet the anticipate need through the year 2000. The 1991 Plan estimates that 427 seasonal residents (usually retirees), will be added to the seasonal population of the County between 1990- 2000. Based on two persons per dwelling unit and six dwelling units per acre, only 214 units of new RV residential development will be needed between 1990 and 2000. The existing approved, but unconstructed RV sites, exceed the projected need almost thirteen times. The proposed DRI would add an additional 1500 units, resulting in 4,051 more units than the projected need. Policy L3.3 of the DeSoto County Comprehensive Plan provides that: Land uses which are potentially incompatible either due to type of use or intensity of use, shall be buffered from one another through the provision of open space, landscaping, berms, alternative site design or other suitable means. Land development regulations shall establish criteria for appropriate buffering between adjacent land uses. Policy L3.4 of the DeSoto County Comprehensive Plan provides that, "where the application of such measures as identified in Policy L3.3 cannot mitigate the incompatibility between proposed and existing land uses, the proposed land use shall be disapproved." The proposed development is not functionally related to the surrounding agricultural activities and numerous incompatibilities between the land uses shall arise as adjacent landowners conduct agricultural activities such as application of pesticides and fertilizers and other activities which produce smells, sprays, dust, noises and other externalities incompatible with residential use. The incompatibility of this project with existing land uses cannot be eliminated under the proposed buffers of berms, landscaping, and fencing proposed in the ADA. To implement Goal L. Objective L4 of the DeSoto County Comprehensive Plan, Policy L4.1 provides that: The DeSoto County Comprehensive Plan and implementing land development regulations, to be adopted by August 1, 1991, shall include provisions that permit or require a variety of land development techniques that discourage sprawl while protecting natural resources including: Establishment of mixed use future land use categories in the DeSoto County Comprehensive Plan to provide residential, commercial and employment opportunities in close proximity; Clustering of development to protect natural resources, open space and agricultural uses, provide for access management to arterial or collector roadways, provide for appropriate buffering, and make efficient use of public facilities and services; Establishment of guidelines or incentives to encourage infill development in the Town Center, Mixed Use Corridor and Suburban Residential areas, which may include . . . There is a clear intent in the DeSoto County Comprehensive Plan to discourage urban sprawl. "Urban sprawl" is defined in the plan as "scattered, untimely, poorly planned urban development that occurs in urban fringe and rural areas and frequently invades lands important for environmental, agricultural and natural resource protection. Urban sprawl typically manifests itself in one or more of the following ways: 1) leapfrog development; 2) ribbon or strip development; and 3) large expanses of low-density, single-dimensional development." The proposed development is an example of the leapfrog development type of urban sprawl. It provides for residential development far beyond the projected needs of the surrounding area. It is located far from the nearest urban centers and is surrounded by rural land uses. The proposed development would create an urban level of density and intensity of use within a rural area. It is not a well balanced mixed use development. It is not compatible with, nor functionally related to, the surrounding uses, and is designed to be cutoff and separated from those uses. The proposed development cannot be considered a "rural village." It does not support surrounding agricultural activities, but is, in fact, incompatible with surrounding land uses. Because of its location and lack of multiple uses, this development will encourage lengthy commuting, contrary to the policies of the state comprehensive plan to continue to reduce per capita energy consumption, Section 187.201(12), Florida Statutes. The proposed project is not an efficient development because of its location away from existing facilities and services, shopping and employment, contrary to the policies of the state comprehensive plan to encourage efficient development and direct development toward areas which will have the capacity to service new population and commerce, Section 187.201(21), Florida Statutes. The State Comprehensive Plan, Section 18, "Public Facilities," provides that Florida shall protect the substantial investments in existing public facilities. This project conflicts with this policy, as investments in existing public facilities are best protected by directing growth to nearby locations to efficiently use those facilities, Section 187.201(18), Florida Statutes. The proposed project also conflicts with the state comprehensive plan policy related to governmental efficiency, which encourages the replacement of small scale economically inefficient local public facilities with more economical regional facilities. The project proposes to establish small facilities, rather than efficiently utilize larger facilities, Section 187.201(21), Florida Statutes. Section 380.08(3), Florida Statutes provides: (3) If any governmental agency denies a development permit under this chapter, it shall specify its reasons in writing and indicate in writing any changes in the development proposal that would make it eligible to receive the permit. The Board of Commissioners, in issuing its denial of the Countryside Retirement Resort specified its reasons for denial and identified changes which would make it eligible for approval as follows: The proposed development known as "Countryside Retirement Resort" is not consistent with the DeSoto County Comprehensive Plan, nor the DeSoto County Land Use Regulations. The proposed development does not make adequate provision for public facilities needed to accommodate the impact of the proposed development. There are no known changes that would make the proposed development eligible to receive approval due to the inappropriateness of the requested zoning. The DeSoto County Zoning Ordinance, Section 14.5(a), provides that among factors to be considered in a rezoning is "whether the proposed change would be contrary, and would have an adverse effect on the Comprehensive Plan." The DeSoto County Zoning Ordinance, Section 14.5(b), provides that among the factors to be considered in a rezoning is "the existing land use pattern." The existing land use pattern in the area is agricultural. The proposed development would create a medium density residential enclave within the existing land use pattern of agricultural use. The DeSoto County Zoning Ordinance, Section 14.5(c), provides that among the factors to be considered in a rezoning is "the possible creation of an isolated district unrelated to adjacent and nearby districts." The proposed development would be an isolated district of high intensity residential land use surrounded by agricultural and low intensity residential land uses. The DeSoto County Zoning Ordinance, Section 14.5(d), provides that among the factors to be considered in a rezoning is "the population such as schools, utilities, street, etc." The existing allowable density in this area of DeSoto County is 1 unit per 10 acres. The proposed development would increase this to 6 units per acre. Response time for police, fire, and rescue services would be poor if provided by existing facilities and personnel. Persons needing essential services that could only be provided in the City of Arcadia would have at least a twenty minute round trip. The County would experience a greater burden in providing services to the proposed development than it would if the development were located closer to the City of Arcadia. The DeSoto County Zoning Ordinance, Section 14.5(f), provides that among the factors to be considered in a rezoning is "whether changed or changing conditions make the passage of the proposed amendment necessary." There are no changed or changing conditions in the area which would make it necessary to amend the zoning or the Comprehensive Plant. The DeSoto County Zoning Ordinance, Section 14.5(g), provides that among the factors to be considered in a rezoning is "whether the proposed change will adversely influence living conditions of the neighborhood." The proposed development would create a high density residential development, urban type land use in an area of DeSoto County which heretofore enjoyed a rural character. The DeSoto County Zoning Ordinance, Section 14.5(h), provides that among the factors to be considered in a rezoning is "whether the proposed change will create or excessively increase traffic congestion or otherwise affect public safety." The proposed development would create traffic congestion, and would adversely affect public safety. The DeSoto County Zoning Ordinance, Section 14.5(l), provides that among the factors to be considered in a rezoning is "whether the proposed change will be a deterrent to the improvement or development of adjacent property in accordance with existing regulations." The proposed development would have an adverse impact on adjacent properties as property owners attempt to develop their properties. This development would drastically reduce the reserve capacity of State Road 31, and adjacent property owners would find it increasingly difficult and expensive to meet the Levels of Service required by the Comprehensive Plan. The DeSoto County Zoning Ordinance, Section 14.5(m), provides that among the factors to be considered in a rezoning is "whether the proposed change will constitute a grant of a special privilege to an individual owner as contrasting with the public welfare." The proposed development would not constitute the grant of a special privilege if approved, since the developer is seeking approval of a PUD. The DeSoto County Zoning Ordinance, Section 14.5(n), provides that among the factors to be considered in a rezoning is "whether there are substantial reasons why the property cannot be used in accordance with existing zoning." There is no reason why the property on which the proposed development is to be located could not be used for what it zones, agricultural usage. The DeSoto County Zoning Ordinance, Section 14.5(o), provides that among the factors to be considered in a rezoning is "whether the change suggested is out of scale with the needs of the neighborhood or the County." The proposed development is out of the scale with the needs of the County and the immediate neighborhood. The neighborhood is designated at a maximum density of 1 unit per 10 acres. This development would be at a density of 6 units per acre. The DeSoto County Zoning Ordinance, Section 14.5(p), provides that among the factors to be considered in a rezoning is "whether it is impossible to find other adequate sites in the County for the proposed uses in districts already permitting such use." There was no showing that other sites in DeSoto County could not be developed at this time. The DeSoto County Zoning Ordinance, Section 9.3, Planned Unit Development Districts (PUD), provides in part that it is the intent of the PUD Ordinance "to provide an optional alternative zoning procedure so that planned developments may be instituted at appropriate locations in the County in accord with the planning and development objectives of the County." The proposed development is not in an appropriate location, nor is it in accord with the planning and development objectives of the County.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is therefore, RECOMMENDED that a Final Order be entered by the Florida Land and Water Adjudicatory Commission denying of the application for development approval of Petitioner, and upholding the decision of the DeSoto County Board of County Commissioners to deny the request for rezoning for the Countryside Retirement Resort. DONE AND ENTERED this 27th day of January, 1992, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of January, 1992. APPENDIX The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on findings of fact submitted by the parties. Petitioner's proposed findings of fact. Accepted in substance: paragraphs - 1(in part),2,3,6(in part),7(in part),16,17,18,19,20(in part),21,22(in part),23,24,26,27(in part),28,29(in part),30, 31,32,33,36(in part),37,38,39,40,41,42,43,44,46(in part),49 (in part),50,51,52,53,54,55,56,57,58,59,60,61 (in part),62,63,64,65,66,67,68,69 (in part),71,72 (in part),73,74,75(in part),76,81,92,95(in part),96(in part),98,99,100,101,105,106(in part),108,109(in part),112(in part) Rejected as against the greater weight of evidence: paragraphs - 4,5,6(in part),(in part),8,15,47,48,72(in part),77,78,79,80,82,83,84,88,89,102,104,106(in part),107,109(in part),110,111,112(in part),113,114 Rejected as irrelevant, immaterial, or subsumed: paragraphs - 9,10,11,12,13,14,20(inpart),22(in part),25,27(in part),29(in part),34,35,36(in part),45,46(in part),49(in part),61(in part),69(in part),70,73,75(in part),85,86,87,90,91,97,103 Rejected as argument or conclusions of law: paragraphs - 93,94,95(in part),96(in part) Respondent's proposed findings of fact. Accepted in substance: paragraphs - 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18 (in part),19(in part),26,27,28,29,30,32(in part),36,37,38,39,40, 41,42,43,44,45,46,47,48,49,50,51,52,53,54,58,59,60,61,62,63,64,65,66,67,68,69,70 ,71,72,74,75,76(in part),77(in part),78,79,80,81, 82,84,85,86,87 Rejected as against the greater weight of evidence: paragraph - 83 Rejected as irrelevant, immaterial, or subsumed: paragraphs - 18(in part),19(in part),20,21,22,23,24,25,37 (in part),55(in part),56(in part),57(in part),73 Rejected as argument or conclusions of law: paragraphs - 14,31,32(in part),33,34,35,55(in part),56(in part),57(in part),76(in part),77(in part) Intervenor Department of Community Affairs' proposed findings of fact Accepted in substance: paragraphs - 1,2,3,4,5,6,7(in part),8,9,10,11,12,13,15,16,17,18,19,20,21(in part),22(in part),23(in part),24,25,26,27,28,29 Rejected as against the greater weight of evidence: paragraphs - 7(in part) Rejected as argument or conclusion of law: paragraphs - 14,21(in part),22(in part),23(in part) Intervenors Halls' proposed findings of fact. Intervenors Halls did not submit separate proposed findings, but adopted the proposals submitted by the Respondent. COPIES FURNISHED: Charlie Stampelos, Esquire William Wiley, Esquire MCFARLAIN, STERNSTEIN, WILEY & CASSEDY, P.A. 600 First Florida Bank Building Tallahassee, Florida 32301 Gary Vorbeck, Esquire Fred Bechtold, Esquire VORBEC, & VORBECK 207 East Magnolia Avenue Arcadia, Florida 33821 Kathryn Funchess Asst. General Counsel Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399 Lewis Hall, Jr., Esquire HALL & HEDRICK Republic National Bank Building 150 Southeast Second Avenue Suite 1400 Miami, Florida 33131 William E. Sadowski Secretary Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399 G. Steven Pfeiffer, Esquire General Counsel, Dept. of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399 Douglas M. Cook, Director Planning & Budgeting Exec. Office of the Governor The Capitol, PL-05 Tallahassee, Florida 32399-0001
The Issue The issue is whether the City of Jacksonville's small scale development amendment adopted by Ordinance No. 2003-1070-E on October 27, 2003, is in compliance.
Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background Bartram is a limited liability corporation which owns an 8.5-acre tract of land at 5720 Atlantic Boulevard between Bartram Road and St. Paul Avenue in Jacksonville, Florida, or less than a mile east of the Hart Bridge (which crosses into downtown Jacksonville) and around one-quarter mile south of the Arlington River.4 The property is now vacant; from 1939 until 1990, however, a three-story, 125,000 square-foot hospital (with three separate "out buildings") for children operated on the site. The unused buildings remained on the site until they were demolished in 1998. On October 27, 2003, the City approved an application filed by Wal-Mart's counsel (originally on behalf of the property's former owner, the Christopher Forrest Skinner Trust, and then the new owner, Bartram) for a small scale plan amendment. This was formalized through the adoption of Ordinance No. 2003-1070-E, which changed the property's land use designation on the FLUM, a component of the Future Land Use Element (FLUE) in the Plan, from RPI to NC. Both land use categories are commercial classifications. If the amendment is found to be in compliance, Wal-Mart intends to construct a 40,000 square-foot free-standing grocery store with a 7,500 square-foot outparcel for other retail stores. The grocery store will be operated 24 hours per day, 7 days per week. Wal-Mart has also agreed to file a second land use application to change approximately 3.0 acres of the site to Conservation (CSV), which means that portion of the property cannot be developed in the future. Ordinance No. 94-1011-568, enacted in 1994, requires that small scale plan amendments be reviewed with a companion rezoning application. This is to ensure that when examining an application for a small-scale amendment, the City’s determination of "in compliance" is predicated on both the Plan and its Land Development Regulations. Pursuant to that requirement, the City also approved a change in the zoning on the property from Commercial, Residential, Office (CRO) to Planned Unit Development (PUD). Under the PUD, the City has limited development of the site to a 40,000 square-foot grocery store and a 7,500 square-foot outparcel for limited retail uses; imposed a limitation on curb cuts; provided for setback restrictions, building orientation, and design standards; and preserved over 70 trees on the property as well as green space. These limitations and restrictions are more stringent than those set forth in the NC category. The City's rezoning decision (Ordinance No. 2003-1071-E) has been challenged in Circuit Court by one of Petitioners. (While the new zoning and site plan appear to be solidified, the City concedes that it has the authority at a later date to approve modifications to the site plan, or even change the zoning on the property to another category that is allowed under NC.) On November 18, 2003, Petitioners filed their Petition challenging the plan amendment. In their unilateral Prehearing Stipulation,5 Petitioners contend that the amendment is not supported by adequate or professionally acceptable data and analysis, and it is inconsistent with the standards governing "the location and extent of commercial uses," "the current designation of Bartram Road as a local road," and "the protection of established residential neighborhoods." At hearing, counsel for Petitioners further stipulated that the allegations of internal inconsistencies regarding urban sprawl and roadway/traffic capacity (contained in the Petition) were being withdrawn. A request to add affordable housing as an issue was denied as being untimely. The parties have stipulated that Petitioners and Intervenors reside, own property, or own or operate a business within the City and offered comments, recommendations, or objections to the City prior to the adoption of the amendment. Accordingly, these stipulated facts establish that Petitioners and Intervenors are affected persons and have standing to participate in this action. Because the City's action involves a small scale (as opposed to a large scale) development plan amendment, the Department of Community Affairs did not formally review the plan amendment for compliance. See § 163.3187(3)(a), Fla. Stat. The Existing and Proposed Land Use on the Site The City's Plan, which was adopted in 1990, includes five types of commercially denominated land use categories, two of which are RPI and NC. The RPI category (in which category the Bartram property has been assigned since 1990) is a mixed- use category "primarily intended to accommodate office, limited commercial retail and service establishments, institutional and medium density residential uses." Among others, this category also authorizes large institutional uses, office-professional uses, veterinarians, filling stations, off street parking, nursing homes, residential treatment facilities, day care centers, and other institutional uses "when sited in compliance with [the FLUE] and other elements of the 2010 Comprehensive Plan." According to the Plan Category Description in the FLUE (pages 50-51, Respondent's Exhibit 13), "RPI developments are frequently appropriate transitional uses between residential and non-residential areas." While the existing RPI designation on the property allows Commercial Neighborhood zoning, which may include a grocery store like Wal-Mart proposes, because of some uncertainty over this, and its desire to have a PUD on the property, the City has required that Bartram seek a land use change to NC with PUD zoning, which serves to limit the range of allowable uses and imposes other development restrictions. The Plan Category Description in the FLUE (pages 51- 52, Respondent's Exhibit 13) provides that NC designated lands "serve the needs of contiguous neighborhoods"; they "will generally be located within a ten minute drive time of the service population"; they allow uses which "serve the daily needs of contiguous neighborhoods"; and they must not "penetrate into residential neighborhoods." They may include "convenience goods, personal services, veterinarians, filling stations and other low intensity retail and office-professional commercial uses developed in freestanding or shopping center configurations," and "[n]ormally, such centers will be anchored by a food or drug store and will contain four to ten other supporting retail and office uses." Finally, NC sites "should abut a roadway classified as a collector or higher facility on the [City's] adopted functional classification system map." The Property and Surrounding Area As noted above, the property has been vacant since 1990, when an existing hospital was closed; demolition of the buildings was completed some eight years later. On its northern boundary (which measures approximately 400 feet), the property abuts Atlantic Boulevard, an extremely busy, six-lane roadway classified on the City’s Highway Functional Classification Map (Map) as a principal arterial road. The eastern boundary of the property (which runs around 480 feet deep) abuts Bartram Road, a two-laned paved road with an 80-foot right-of way which runs south from Atlantic Boulevard for around one-half mile and then curves east where it meets University Boulevard (a north-south arterial road) a few hundred feet away. When the hearing was conducted in January 2004, or after the amendment was adopted, Bartram Road was still classified as a local road on the City's Map. Whether it is still classified as a local road at this time is not of record.6 On its western side, the property abuts St. Paul Avenue, a local road which dead ends just south of Bartram's property on Heston Road (another local road), while nine single-family lots are located adjacent to the southern boundary of the property (and on the northern side of Heston Road). The property is around one-quarter mile west of a highly developed major intersection at Atlantic and University Boulevards. The property (on both sides of the roadway) lying between the eastern side of Bartram's property and the major intersection is currently classified as Community/General Commercial (CGC), which authorizes a wide range of slightly more intense commercial uses than are authorized in NC. That land use category is "generally developed in nodal patterns and [is intended to] serve large areas of the City." Directly across Bartram Road to the east (and in the southeastern quadrant of Bartram Road and Atlantic Boulevard) is an older shopping center anchored by a 50,000 square-foot Publix grocery store. The shopping center also has a sandwich shop, florist, pizza parlor, and beauty salon, and sits on a tract of land approximately the same size as Bartram's property. That parcel has approximately the same depth as the Bartram property (480 feet), and the rear of the stores come as close as 35 feet to the single-family homes which lie directly behind the shopping center. Since 1887, the St. Paul Episcopal Church has occupied the 5-acre tract of property directly across St. Paul Avenue to the west. Besides the church itself, a library, office building, educational wing, parish fellowship hall, and a small house (all owned by the church) sit on the property. From the church property to the Little Pottsburg Creek, or around a quarter of a mile to the west, a large, single parcel of land fronts on the southern side of Atlantic Boulevard and is classified as RPI. While aerial photographs appear to show that the property west of the church is either undeveloped or largely undeveloped, under its present RPI classification it may be used for commercial, institutional, or medium density residential purposes at some time in the future. The distance from the intersection of Atlantic and University Boulevards to the Little Pottsburg Creek appears to be six-tenths of a mile or so. An apartment complex (the Villa Apartments) sits on the northeastern quadrant of Bartram Road and Atlantic Boulevard on a fairly narrow sliver of land classified as Medium Density which extends north-northwest some 1,200 feet or so to the Arlington River, a tributary of the St. Johns River. Immediately west of the apartment complex along the northern side of Atlantic Boulevard (and across the street beginning at the eastern part of Bartram's property and extending west) the land uses along the roadway include a relatively small CGC parcel containing a dry cleaning establishment and an upholstery shop; an approximate 350 to 400- foot strip of Low Density Residential (LDR) property (which faces more than half of the Bartram site) with two single-family homes located directly on Atlantic Boulevard, as well as two grandfathered non-conforming uses (a plumbing establishment and a coin shop); then an RPI parcel (which faces the western edge of Bartram's property and extends perhaps 150 feet along the road) with a small office development consisting of 8-10 offices; and finally more LDR parcels until the road crosses the Little Pottsburg Creek. Two local roads which dead end on Atlantic Boulevard and provide access into the residential areas north of Atlantic Boulevard are Oak Haven Street, which terminates directly across the street from the Bartram property, and Campbell Street, which terminates in front of the St. Paul Episcopal Church. Except for the limited commercial uses which front on the northern side of Atlantic Boulevard, and the apartment complex which lies in the northeastern quadrant of Atlantic Boulevard and Bartram Road, virtually all of the property directly across the street to the north and west of Bartram's property running 1,200-1,500 feet or so to the Arlington River is made up of an old, established residential neighborhood (known by some as the Oak Haven neighborhood) consisting of single-family homes, some of which (closest to the Arlington River) are on larger multi-acre tracts and have historical significance. Indeed, the oldest home in the City of Jacksonville, built around 1848, is located in this area. The area directly south of the property and to the west of Bartram Road is classified as Low Density Residential and contains single-family homes for perhaps one-half mile or so. As noted above, some of these homes back up to the rear of the Bartram property. The Amendment and Review by Staff Under the process for reviewing small scale amendments, the application is first reviewed by the City's Planning and Development Department for completeness and accuracy. After the staff reviews the data and performs an analysis of the data, the application is assigned an ordinance number. A staff report is then prepared, and the application is set for hearing before the City's Planning Commission (Commission), an advisory board which makes a recommendation on the application. The Commission's decision (which in this case was a recommendation to deny both applications) is then reviewed by the Land Use and Zoning Committee of the City Council, which consists of 7 members (and voted 5-1 in this case to approve the applications), and the matter is finally considered by the full 19-member City Council (which in this case approved the applications by a 13-2 vote, with 4 members abstaining or absent). After the application was filed, among other things, the City staff reviewed various maps, the FLUM, a zoning atlas, other relevant portions of the Plan, and data provided by other governmental agencies. It also made an inspection of the site and other potentially affected properties in the neighborhood. In preparing its report, the staff analyzed the roadway system, the neighborhood character, the site characteristics, the commercial node, compatibility with the Plan and existing uses, and compatibility with the Strategic Regional Policy Plan and State Comprehensive Plan. A more detailed account of the data relied upon by the staff and its analysis of that data is found in Respondent's Exhibit 19. Besides the staff report, there are underlying work papers (not attached to the report) used by the staff to support its findings (Respondent's Exhibit 33). As a part of its review and analyses, the City considered and applied the locational criteria found in the Operative Provisions of the FLUE, which describe the factors to be used in determining appropriate locations for primary use plan categories (such as NC) in plan amendment requests. Those factors include street classification, public facilities and services, land use compatibility, development and redevelopment potential, structural orientation and other site design factors, ownership patterns, and environmental impacts. The analysis included an evaluation by staff of the impact of development based upon the most intensive uses permitted on NC property. Besides the locational criteria, the FLUE contains a number of policies directed at combating the expansion of strip commercial uses that have historically developed along the City's arterial and collector roadways, including Atlantic Boulevard. These are found in FLUE Policies 3.2.2, 3.2.5, 3.2.7, 3.2.8, and 3.2.16. In reviewing the application, the staff considered these policies and concluded that the amendment would be consistent with those provisions. Objections by Petitioners As noted earlier, Petitioners generally contend that the amendment is not supported by adequate data and analyses. They further contend that the amendment is inconsistent with standards governing the location and extent of commercial uses, the current designation of Bartram Road as a local road, and the protection of established residential neighborhoods. While the various papers filed by Petitioners did not identify the specific provisions of the Plan allegedly being violated, they were disclosed through their expert at the final hearing. Petitioners first contend that the City's data and analyses were predicated on the uses and restrictions contained in the PUD rezoning proposal, and not on alternative development scenarios that are possible under the NC land use designation. They also contend that the City failed to develop data and analyses regarding the impact on FLUE Objective 3.1 or FLUE Policies 1.1.19 and 3.1.7. The latter FLUE policy and the cited objective pertain to affordable housing, an issue not timely raised by Petitioners, while the remaining policy requires that FLUM amendments be based on the amount of land required to accommodate anticipated growth and the projected population of the area. The evidence shows that, prior to the adoption of the amendment, the City reviewed appropriate data from a number of different sources, and it evaluated the plan amendment based upon the most intensive uses that could be permitted under the NC land use designation. In every instance where Petitioners' expert testified that there was insufficient data and analyses, the testimony and exhibits credibly countered that testimony. Therefore, it is found that the plan amendment is supported by adequate and acceptable data, and that the data were collected and applied in a professionally acceptable manner. Petitioners' main contention regarding consistency is that the amendment conflicts with FLUE Policies 1.1.8, 3.2.1, and 3.2.5 in several respects. The first policy requires in relevant part: that all new non-residential projects [including commercial projects on NC lands] be developed in either nodal areas, in appropriate commercial infill areas, or as part of mixed or multi-use developments such as Planned Unit Developments (PUDs), . . . Policy 3.2.1 requires that the City promote, through the use of development incentives and other regulatory measures, development of commercial and light/service industrial uses in the form of nodes, centers or parks, while discouraging strip commercial development patterns, in order to limit the number of curb cuts and reduce conflicts in land uses, particularly along collectors and arterials. Finally, Policy 3.2.5 provides that the City shall require neighborhood commercial uses to be located in nodes at the intersections of collector and arterial roads. Prohibit the location of neighborhood commercial uses interior to residential neighborhoods in a manner that will encourage the use of local streets for non-residential traffic. Petitioners first contend that Bartram's property does not lie within a "node," as that term is defined in the Definitions portion of the FLUE, and that by siting the NC land outside of a nodal area, the amendment is encouraging strip development in contravention of all three policies. They also contend that the amendment conflicts with Policy 3.2.5 because the Bartram property is not located at the corner of an arterial or collector road. Finally, they assert that the amendment is at odds with Policy 1.1.8 because the Bartram parcel is not an "appropriate commercial infill location." In resolving these contentions, it is first necessary to determine whether Bartram Road is a collector or a local street. By virtue of its high traffic volume (an Average Daily Traffic count of more than 1,600), the road actually functions as a collector road, that is, it collects traffic from the local roadway network in the neighborhood, two elementary schools, and a church campus (all south of Atlantic Boulevard) and distributes that traffic to both Atlantic and University Boulevards on each end, both of which intersections are signalized. Indeed, one of Petitioners' witnesses described Bartram Road as a heavily-used, cut-through street for persons traveling between Atlantic and University Boulevards. When the amendment was adopted, however, and even as late as the final hearing in January 2004, the road was still classified on the City's Map as a local road. For purposes of making a land use change, the actual classification on the City's Map should be used, rather than basing the decision on a future change on the Map that may or may not occur. Therefore, the property does not lie at the intersection of a collector or arterial roadway. A "node" is defined in the Definitions portion of the FLUE (page 74, Respondent's Exhibit 13) as follows: A focal point within the context of a larger, contiguous area surrounding it. It is an area of concentrated activity that attracts people from outside its boundaries for purposes of interaction within that area. The developed or developable land areas at the confluence of collector or higher classified roadways, which are suitable for medium to high densities and intensities of use for either single, multiple or mixed use developments. Petitioners contend that a fair reading of the definition is that a node (or focal point of concentrated activity) exists only at the intersection of University and Atlantic Boulevards, and does not extend outward to include the vacant Bartram site. In other words, Petitioners contend that the node is limited to the individual parcels at the intersection itself. On the other hand, the City and Intervenors take the position that a commercial node extends from its center (the intersection) outward in a lineal direction along a roadway until it ends at a natural physical boundary; if no physical boundary exists, then the node extends only to the end of the existing development along the roadway. Using this rule of thumb, they argue that the node begins at the intersection of Atlantic and University Boulevards and extends westward, presumably on both sides of the road,7 in a lineal direction along Atlantic Boulevard until it ends at a natural physical boundary, the Little Pottsburg Creek, approximately six-tenths of a mile away. The purpose of a node is, of course, to concentrate commercial uses near an intersection and reduce the potential for strip development along arterial roads, such as Atlantic Boulevard (which now has strip development extending eastward from the intersection for more than a mile to the Regency Square Shopping Mall). All parties agree that the existing development along Atlantic Boulevard west of the intersection up to the Bartram site is strip or ribbon development, as defined in the Plan, that is, development which "is generally characterized by one or two story commercial/office uses that are located immediately adjacent to one another, or in close proximity, extending out in a development pattern, typically along arterial roadways and usually each individual structure has one or more driveway accesses to an arterial." (Respondent's Exhibit 13, page 76.) The more persuasive evidence supports a finding that the node, that is, the area of concentrated commercial activity or the developed or developable lands at the confluence of University and Atlantic Boulevards, logically extends from the intersection westward in a lineal fashion along the southern side of Atlantic Boulevard until the end of the existing development, that is, the Publix shopping center, where virtually all commercial uses on both sides of the roadway end. (On the northern side of the road, the node would terminate just east of the Villa Apartments, where the CGC uses end). This collection of parcels (up to the eastern side of the Bartram site) includes all of the "developed or developable land areas at the confluence of collector or higher classified roadways, which are suitable for medium to high densities and intensities of use for either single, multiple, or mixed use developments." (If the contrary evidence was accepted, that is, the node extends to the Little Pottsburg Creek, the City could arguably change the land use on the property west of the church to a more intensive commercial use, and in doing so encourage more strip development.) Therefore, the Bartram property is not located within a nodal area and is not a developable land area suitable for "medium to high densities and intensities" of use. By changing its classification to NC and encouraging further strip development beyond the node, the amendment conflicts with Policies 1.1.8, 3.2.1, and 3.2.5. "Commercial infill" is defined in the FLUE as "[c]ommercial development of the same type and scale as adjacent commercial uses that is sited between those uses in existing strip commercial areas." (Respondent's Exhibit 13, page 68.) To qualify as commercial infill under this definition, the adjacent commercial uses must be "of the same type and scale" as those being sited on the vacant property. In the staff report, the City describes the property as "a true infill site," since the land on both sides of the parcel is developed, and the Bartram property is now vacant. However, while the Bartram property has a similar type and scale of development on its eastern side (an older Publix grocery store with 4 connected small retail shops), the property on its western side is a church campus and therefore a completely dissimilar use. (In addition, the property on its southern side is single-family residential). Because the surrounding uses are not of the same type and scale as the proposed infill, the change in land use is not an appropriate commercial infill area. Therefore, the amendment conflicts with Policy 1.1.8, which requires that "all non-residential projects be developed in either nodal areas, [or] in appropriate commercial infill areas." In their Amended Proposed Recommended Order, the City and Intervenors contend that the development nonetheless qualifies as "urban infill," which is defined in part at pages 77-78 of the FLUE as "[t]he development of vacant parcels in otherwise built-up areas where public facilities . . . are already in place." While this catch-all definition would appear to authorize the type of infill being proposed by Bartram (as well as virtually any other type of infill since the Bartram site is a vacant parcel in an otherwise built-up area), other FLUE provisions refer to commercial infill and nodal areas as the primary considerations for siting NC property. Finally, the City and Intervenors suggest that the plan amendment provides an appropriate transition from the busy intersection uses to residential neighborhoods, that is, from intense commercial uses to the east and residential uses to the south and west. The change, if approved, will result in two fairly large grocery stores, one in a shopping center configuration, and both with attendant retail stores, sitting side by side, with a church campus immediately to the west, existing residential uses to the south, and primarily residential uses directly to the north. This pattern of development is at odds with Policy 1.1.7, which requires a "[g]radual transition of densities and intensities between land uses in conformance with the [FLUE]." The other contentions of Petitioners have been considered and found to be unpersuasive.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Administration Commission enter a final order determining that the small scale development amendment adopted by the City of Jacksonville in Ordinance No. 2003-1070-E is not in compliance. DONE AND ENTERED this 5th day of March, 2004, in Tallahassee, Leon County, Florida. S DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 5th day of March, 2004.
Findings Of Fact Parties Petitioners Austin, Houston, and Dorn all reside in the City of Cocoa (Cocoa or City). Petitioners Hendry both reside in Cocoa. The Department of Community Affairs (DCA) is the state land planning agency under the Local Government Comprehensive Planning and Land Development Regulation Act, Chapter 163, Part II, Florida Statutes (the Act). Cocoa is located entirely within Brevard County, which is within the jurisdiction of the East Central Florida Regional Planning Council (the Regional Planning Council). The resident population of Cocoa is presently about 18,000 persons. The City encompasses over 4500 acres and abuts the Indian River, which is also identified as the Indian River Lagoon. Preparation of Proposed Plan By Ordinance 6-86, which was adopted on March 25, 1986, the Cocoa City Council designated the Cocoa Planning and Zoning Board as the local planning agency under the Act. The Planning and Zoning Board thereby became responsible for preparing the Cocoa comprehensive plan required by the Act (the Plan), conducting public hearings on the Plan, and recommending the Plan to City Council for adoption. In February, 1987, Cocoa entered into a contract with the Regional Planning Council for assistance in preparing the Plan. Pursuant to the contract, the Regional Planning Council drafted all elements of the Plan except the Potable Water Subelement of the Public Facilities Element and related portions of the Capital Improvements Element, which CH2M Hill prepared; the Wastewater Subelement of the Public Facilities Element and related portions of the Capital Improvements Element, which Camp, Dresser and McKee prepared; and the Solid Waste Subelement of the Public Facilities Element and related portions of the Capital Improvements Element, which the City prepared. On November 7, 1987, a 4 1/4" by 3" display advertisement in the Florida Today newspaper announced that Cocoa had begun to prepare an update of its comprehensive plan in conformance with the 1985 Local Government Comprehensive Planning and Land Development Act. The advertisement stated that the preparation of the update "will have the effect of regulating the use of lands within the municipal limits of the City of Cocoa." The advertisement advised that copies of documents prepared during the updating process would be on file in the City's Community Improvement Department. The advertisement added that the public would be informed of public meetings through the news media and bulletins posted at City Hall. The Florida Today newspaper is a standard-sized newspaper of general paid circulation in Brevard County and of general interest and readership in Cocoa. The newspaper is published at least five times a week. All advertisements described herein appeared in the Florida Today newspaper and adequately identified the location of the advertised meeting or documents. On November 17, 1987, a 1 1/4" by 2 3/4" classified-type advertisement announced a meeting of the Planning and Zoning Board on November 18, 1987, at 5:15 p.m. for the purpose of discussing preliminary drafts of the Traffic Circulation and Recreation and Open Space Elements of the Plan. The advertisement stated that copies of the relevant documents could be obtained from the Community Improvement Department. On November 18, 1987, the Planning and Zoning Board conducted a public hearing on the Traffic Circulation and Recreation and Open Space Elements. On November 28, 1987, a 1 1/4" by 2 3/4" classified-type advertisement announced a meeting of the Planning and Zoning Board on December 2, 1987, at 5:15 p.m. for the purpose of discussing preliminary drafts of the Housing and Conservation Elements of the Plan. The advertisement stated that copies of the relevant documents could be obtained from the Community Improvement Department. On December 2, 1987, the Planning and Zoning Board conducted a public hearing on the Housing and Conservation Elements. There is some evidence to suggest that discussion of the Conservation Element was carried over to the next regularly scheduled meeting of the Planning and Zoning Board on December 9, 1987. On January 9, 1988, a 1 1/4" by 2 3/4" classified-type advertisement announced a meeting of the Planning and Zoning Board on January 13, 1988, at 5:15 p.m. for the purpose of discussing the Drainage Subelement of the Public Facilities Element and the Coastal Management Element. The advertisement stated that copies of the relevant documents could be obtained from the Community Improvement Department. On January 13, 1988, the Planning and Zoning Board conducted a public hearing on the Drainage Subelement of the Public Facilities Element and the Coastal Management Element. On February 25, 1988, a 1 1/4" by 5 3/4" classified-type advertisement announced meetings of the Planning and Zoning Board on March 9, 1988, at 5:15 p.m. and the City Council on March 22, 1988, at 7:00 p.m. for the purpose of hearing all interested persons on the Future Land Use and Capital Improvements Elements of the Plan. The advertisement stated that copies of relevant documents could be obtained from the Community Improvement Department. The record is unclear as to whether these meetings took place, although the Planning and Zoning Board met on March 23, 1988, and discussed the Future Land Use, Intergovernmental, and "Capital Facilities" Elements, as well as the "Sanitary Sewer" Subelement of the Public Facilities Element. On March 28, 1988, a 4 1/4" by 3" display advertisement described the planning process in the same manner as did the November 7 display advertisement. The March 28 advertisement announced that the Planning and Zoning Board and City Council would hold joint workshops on March 29, 30, and 31, 1988, at 5:15 p.m. to discuss "public facilities, coastal management, housing, transportation, recreation and open space, intergovernmental coordination, capital improvement and future land use elements." The advertisement stated that copies of relevant documents could be obtained from the Community Improvement Department. The record is unclear as to whether these meetings took place as scheduled, although, at minimum, it appears that the March 29 meeting took place. On April 23, 1988, at 5:15 p.m., the Planning and Zoning Board commenced a special meeting with the following persons present: six members and the chairman of the Planning and Zoning Board, four members of the City Council and the Mayor, the City Manager and Assistant City Manager, the Community Improvement Administrator, a City planner, and four representatives of the Regional Planning Council. The purpose of the meeting was to consider the Future Land Use, Traffic Circulation, Housing, Public Facilities, Coastal Management, Conservation, Recreation and Open Space, Intergovernmental Coordination, and Capital Improvements Elements of the Plan. The Future Land Use Element was unavailable, so the City Council postponed the discussion of this element until a later date. At the April 13 meeting, Rochelle Lawandales, the Community Improvement Administrator, stated that no formal action would be taken at the workshop, but that the Plan would go before the City Council on April 26, 1988, at 7:00 p.m. during a public hearing. At the conclusion of the April 26 hearing, the City Council would be expected to authorize staff to submit the Plan to DCA. The April 13 meeting was adjourned at 8:05 p.m. On April 19, 1988, at 5:15 p.m., the Planning and Zoning Board began a special meeting with largely the same persons who attended the April 13 meeting. The purpose of the meeting was to discuss the Future Land Use Element and Future Land Use Map. The discussion culminated in the consensus that the Planning and Zoning Board would recommend that the City Council transmit the Plan to DCA. The meeting adjourned at 6:55 p.m. Transmittal of Proposed Plan to DCA On April 19, 1988, a 6 1/2" by 10 1/2" display advertisement with a large-type headline appeared on page 5 of Section B of the newspaper. The advertisement, which was in the form prescribed by Section 163.3184(15)(c), Florida Statutes, announced that the City Council proposed to change the use of land within the City and that on April 26, 1988, at 7:00 p.m. the City Council would conduct a public hearing on the Plan proposed to be sent to DCA (Proposed Plan). The advertisement contained a large map of Cocoa with major street names indicated, listed the nine major elements of the Proposed Plan, and advised that interested persons could submit written comments or attend the public hearing to be heard regarding the transmittal of the Proposed Plan to DCA. The advertisement stated that the City Council would not give final approval to changes proposed at the hearing, which was described as part of the process designed to lead to the eventual adoption of the Plan. On April 26, 1988, the City Council conducted a public hearing. Following receipt of public comment, which was relatively limited, Mayor Dollye Robinson closed the public hearing, and the City Council unanimously approved Resolution No. 88-17, which authorizes the transmittal of the Proposed Plan to DCA. On May 1, 1988, DCA received the City of Cocoa-- Comprehensive Plan, which consists of two volumes. Volume I is Background Analysis. Volume II is Goals, Objectives, and Policies. DCA also received a document containing population estimates for Cocoa and an Evaluation and Appraisal Report (EAR), dated April, 1988, assessing the performance of the Cocoa comprehensive plan adopted under the Local Government Comprehensive Planning Act of 1975. (The Proposed Plan and Plan are unrelated to the comprehensive plan assessed in the EAR.) On May 8, 1988, a 4 1/4" by 3" display advertisement announced that the Proposed Plan and supporting documentation were available for review at the public library and city hall. Proposed Plan: Goals, Objectives, and Policies General The Act requires that each comprehensive plan contain eight or nine major elements: Capital Improvements; Future Land Use; Traffic Circulation; Sanitary Sewer, Solid Waste, Drainage, Potable Water, and Natural Groundwater Aquifer Recharge (identified as the Public Facilities Element in the Proposed Plan and Plan); Conservation; Recreation and Open Space; Housing; Intergovernmental Coordination; and, if applicable, Coastal Management. Each element comprises goals, objectives, and policies, which respectively represent long-term ends, criteria by which progress toward the goals can be measured, and programs and activities by which the goals are to be achieved. The goals, objectives, and policies in the Proposed Plan are largely carried over to the Plan. Future Land Use Element and Map The Proposed Plan contains two objectives under the Future Land Use Element. They are: Objective 1.1: Future growth and development will be managed through the preparation, adop- tion, implementation and enforcement of land development regulations. Objective 1.2: Future development and redevel- opment activities shall be directed in appro- priate areas as depicted on the Future Land Use Map, consistent with sound planning principles, minimal natural constraints, and the goals, objectives, and policies provided in the . . . Plan. Policy 1.1 of the Future Land Use Element provides in part: The City will adopt land development regula- tions that shall contain specific and detailed provisions required to implement the . . . Plan and which: * * * Regulate the use of land and water consis- tent with this element and ensure the compati- bility of adjacent land uses and provide for open space; Protect the wetland areas identified in the conservation element and future land use element; Regulate areas subject to seasonal and periodic flooding and provide for drainage and stormwater management; * * * H) Provide that development orders and permits shall not be issued which would result in a reduction of the adopted level of service standards. The Future Land Use Map, which is part of the Proposed Plan, depicts eight land use categories: low-, medium-, and high-density residential, commercial, industrial, institutional, open space and recreational, and activity center. Policy 1.2 specifies a maximum density of seven units per acre for low- density residential and 15 units per acre for medium-density residential. The Future Land Use Map in the Proposed Plan depicts four large parcels as open space. These are north of Michigan Avenue, just west of U.S. Route 1; south of Michigan Avenue, just west of U.S. Route 1; north and west of the intersection of Michigan Avenue and Range Road; and east of the north end of Range Road and west of the largest unincorporated enclave surrounded by the City. According to the two Existing Land Use Maps contained in the Background Analysis, which is described in Paragraphs 47-67 below, the four large parcels designated as open space on the Future Land Use Map are wetlands, except for a small strip that is probably a park and is described further in Paragraph 127 below. The four open spaces constitute nearly all of the existing wetlands in the City. Neither the Future Land Use Map in the Proposed Plan nor either of the Existing Land Use Maps in the Background Analysis depicts any historical resources. Housing Element The Housing Element of the Proposed Plan contains the following provisions with respect to historic properties: Objective 3.1.4: Housing designated histori- cally significant will continue to be preserved and protected, and the quality of existing homes and neighborhoods will be maintained or improved. Policy 3.1.4.4: Assist owners of designated historically significant housing to apply for and utilize state and federal assistance programs. Policy 3.1.4.7: The City will aid in the identification of historically significant housing and structures. Public Facilities Element The Public Facilities Element of the Proposed Plan provides the following level of service standards for drainage: design storm event--five year frequency/24-hour duration event; on-site stormwater management--retention of first one inch of rainfall runoff or, with respect to drainage areas under 100 acres with under 80% impervious surface, retention of first one-half inch of runoff; stormwater quantity--no greater than pre-development stormwater runoff flow rates, quantities, peaks, and velocities; and stormwater quality--no degradation of existing water quality condition in receiving water bodies. The Drainage Subelement of the Public Facilities Element of the Proposed Plan contains seven objectives. Three of the objectives focus upon floodplains and wetlands: Objective 4.3.5: To reduce existing flooding problems and to prevent additional flooding problems from being created as a result of future development. Objective 4.3.6: To ensure the protection and preservation of existing wetlands as viable components of the City's surface water management systems, to include the establish- ment or maintenance of desirable hydroperiods, water quality conditions, and natural ecosystems. Objective 4.3.7: To ensure that proper and adequate surface water management facilities are provided in response to identified needs. Several policies under Objectives 4.3.5, 4.3.6, and 4.3.7 describe the data still needed by the City to determine its drainage needs and the means by which Cocoa intends to attain the overall goals of the subelement: Policy 4.3.2.5: Efforts will be undertaken to eliminate existing points of direct stormwater discharge into receiving surface waterbodies, where possible, based on the following procedure: engineering studies will be initiated for the purpose of identifying the comparative nonpoint pollution impacts of each direct discharge point, and determining relative priorities for corrective actions (or "retrofit" projects) to be undertaken, based on the extent of-- --adverse impacts on entire receiving waterbody --system retrofitting required to eliminate or minimize the adverse impacts --projected benefits to be accomplished --overall implementation feasibility facility design studies will be initiated for those direct discharge points determined to have the highest priority. The estimated costs of individual corrective action projects will be included as components of the Capital Improvements Program. Policy 4.3.5.2: Drainage needs assessment investigations will be initiated for areas within the City which have been identified as experiencing flooding problems, for the purpose of identifying actions necessary to alleviate the problems. Policy 4.3.5.3: Based on the findings of the drainage needs assessment investigations, engineering studies will be initiated to develop solutions to the identified flooding problems, with the cost estimates being included in the Capital Improvements Program. Policy 4.3.6.1: Public infrastructure improvements that encourage the development of wetlands will be avoided except in the case of overriding public interest, with appropriate measures being taken to discourage development in affected wetland areas. Policy 4.3.6.2: The City will review its land development and zoning ordinances, regulations and standards with the intent being to remove any requirements which might encourage develop- ment in wetland areas. Policies 4.3.7.1 and 4.3.7.2 promise an inventory of Cocoa's surface water management system followed by an engineering study of the system components to identify the extent of excess or deficient surface water flow or storage capacity. The final policy in this subelement states: Policy 4.3.7.9: Flood control for new develop- ment will be accomplished through the limita- tion of fill in the 100-year floodplain. In cases where there are no alternatives to fill in the floodplain, compensatory storage for such fill will be provided through excavation in adjacent upland areas (above the 100-year floodplain) of a volume equivalent to the loss of storage within the 100-year floodplain resulting from the placement of fill, where such compensatory storage can be accomplished in an environmentally sound and economically feasible manner. Coastal Management Element The Coastal Management Element of the Proposed Plan does not refer to coastal wetlands or historic resources. It does not contain any analysis of the effects on estuarine water quality of existing drainage systems and nonpoint source pollution such as that carried by stormwater runoff. Conservation Element The Conservation Element of the Proposed Plan contains nine subelements. Several of these subelements contain objectives or policies addressing wetlands, floodplains, and stormwater drainage. The Vegetation and Wildlife Habitat Subelement of the Conservation Element provides: Policy 6.4.2: Areas of natural habitat within the 100 year floodplain shall be given priority consideration in the identification of lands which address passive recreational demand and open space objectives. Policy 6.4.3: In order to reduce the adverse consequences of floodplain development and simultaneously encourage the conservation of natural habitat, the City's Flood Damage Prevention ordinance shall be amended to discourage construction in the floodplain by requiring the provision of compensatory storage for fill placed within the floodplain. Policy 6.4.7: The City shall not approve any development which would significantly and adversely alter the ecological functions of freshwater wetlands or deepwater habitat. Ecological functions include: (a) provision of wildlife and fisheries habitat; (b) main- tenance of in-stream flows and lake levels during periods of high and/or low rainfall; (c) erosion control; and (d) water quality enhancement. The Fisheries and Estuarine Habitat Subelement of the Conservation Element provides: Objective 6.5: The City shall protect the ecological well being of the Indian River Lagoon from adverse activities or impacts, so as to maintain or enhance the abundance and diversity of estuarine habitat and species. Policy 6.5.2: The city shall establish site design standards and regulations for the control of stormwater runoff to insure the adequate treatment of stormwater from all new development or redevelopment prior to its discharge to surface waters. Policy 6.5.3: The City shall take steps to identify means for reducing the volume of untreated stormwater discharged to surface waters, and shall develop a program to take corrective action, to the greatest extent feasible. The Water Quality Protection Subelement of the Conservation Element contains similar provisions with respect to the control of stormwater runoff and development of corrective programs. The Floodplain Management Subelement of the Conservation Element states: Objective 6.8: The City shall protect the flood storage and conveyance functions of the 100 year floodplain. Policy 6.8.1: In order to reduce the adverse consequences of floodplain development and simultaneously encourage the conservation of natural habitat, the City's Flood Damage Prevention ordinance shall be amended to discourage construction in the floodplain by requiring the provision of compensatory storage for fill placed within the floodplain. Policy 6.8.2: Developers shall be encouraged to incorporate those portions of sites which are within the 100 year floodplain as open space preservation. Policy 6.8.3: The City shall promote wetlands preservation and non-structural floodplain management by encouraging the use of isolated wetlands as detention areas, where such use is consistent with good engineering practice and does not significantly degrade the ecological value of wetlands. Pre-treatment of stormwater runoff by diversion of the "first flush" shall be required prior to discharge to wetland detention areas. Policy 6.8.4: The City shall encourage public and private agencies . . . in acquiring floodplains. Recreation and Open Space Element The Recreation and Open Space Element of the Proposed Plan provides: Goal 7.2: Ensure the conservation of open space areas in the City to provide aesthe- tically pleasing buffer areas, to serve as wildlife habitats, to act as groundwater recharge areas, to give definition to the urban area, and to enhance and promote natural resources. Policy 7.2.1.2: Designate conservation areas within the City as part of the future land use map in order to preserve open space and fulfill objectives discussed in this element and the Conservation Element. Capital Improvements Element The Capital Improvements Element of the Proposed Plan provides: Objective 9.1: The Capital Improvements Element will establish adopted levels of service for public facilities and capital improvement projects which the City will undertake. The Five-Year Schedule of Improvements will identify projects which a) meet existing deficiencies; b) provide repair or replacement of existing facilities; [and] c) accommodate desired future growth. Objective 9.2: All land use decisions which impact the Capital Improvements Element or Future Land Use Element will be coordinated by the City Manager, or his designee, in conjunction with the City's Planning and Zoning Board, and approved by City Council. Objective 9.3: Annual review of the Capital Improvements Element will be included in the City's budget process. As part of this review the Finance Department shall be responsible for: (1) addressing the fiscal impact of capital improvement projects on revenue and expenditures, and (2) updating the fiscal assessment section of the Capital Improvements Element. Objective 9.4: Public facility improvements that are needed to support new growth will maintain adopted levels of service. Improve- ments to public facilities which result from the impact of new development will require equitable cost participation by the developer. Policy 9.4.1: The City Manager shall initiate impact analysis of proposed development projects to determine the impact of the development on the City's fiscal operations and LOS [i.e., levels of service] for public facilities. Objective 9.5: The City will not approve development which requires public facility improvements that exceed the City's ability to provide these in accordance with the adopted LOS standards. Policy 9.5.1: Before a development is approved, the City Manager or his designee will determine that any needed public facility improvements do not exceed the City's funding capacity. Policy 9.5.2: Development approved prior to the adoption of this Plan which requires improvements to public facilities will be included in the Five-Year Schedule of Improvements with a funding priority designation. The Five-Year Schedule of Capital Improvements in the Proposed Plan includes only four projects: ongoing resurfacing and repair of roads, possible four-laning one specific road, expanding the wastewater treatment plant, and extensive, detailed work to the potable water system. I. Monitoring and Evaluation Provisions regarding Monitoring and Evaluation follow the goals, objectives, and policies in Volume II of the City of Cocoa--Comprehensive Plan. Concerning the public participation requirement, this section states in relevant part: In cases in which the proposed ordinance deals with more than five percent (5%) of the total land area of the municipality the council shall provide for public notice and hearings as follows: The council shall hold two (2) advertised public hearings on the proposed ordinance. Both hearings shall be held after 5:00 p.m. on a weekday and the first shall be held approxi- mately seven (7) days after the day that the first advertisement is published. The second hearing shall be held approximately two (2) weeks after the first hearing and shall be advertised approximately five (5) days prior to the public hearing. The day, time and place at which the second public hearing will be held shall be announced at the first public hearing. [This section is virtually identical to the language contained in Section 163.3184(15)(c), Florida Statutes.] [This section allows notice by mailing instead of advertising.] (Laws of Fla., Ch. 59-1186, Art. V, Section 9; Ord. No. 4-80, Section, [sic] 4-8-80) Proposed Plan: Background Analysis Future Land Use Element and Map The Future Land Use Element of the Background Analysis explains the purpose of the Future Land Use Map: The future location and distribution of land use are shown on the Future Land Use map. This map identifies appropriate types of land uses if all vacant land were to be utilized within the ten year planning horizon. Once the Future Land Use map is adopted, all development regulations in effect subsequent to its adoption must be consistent with it. Land development regulations in particular, shall rely on the map for their rational basis. (Future Land Use Element, Background Analysis, p. 1-3.) The Future Land Use Element of the Background Analysis states that the existing land use in Cocoa in 1987 includes about 389 acres of wetlands, or 8.6%, out of a total of 4520 acres. (Future Land Use Element, Background Analysis, Table 1-2.) Public Facilities Element The Drainage Subelement of the Public Facilities Element of the Background Analysis describes Cocoa's drainage as flowing equally into two waterbodies: the Indian River Lagoon on the east and the St. Johns River on the west. Of the five main drainage areas within Cocoa, three are part of the Indian River Lagoon Watershed and two are part of the St. Johns River Watershed. The map of Drainage Areas/Facilities, which is part of the Drainage Subelement, depicts each of the five drainage areas. Drainage Area III is bounded on the east by the high relict dune line just east of U.S. Route 1, on the west by Clearlake Road, on the south by Dixon Boulevard, and on the north by a low ridgeline in the vicinity of Industrial Park Road. Drainage Area III encompasses the wetlands bisected by Michigan Avenue, just west of U.S. Route 1. These wetlands, which are about 3000 feet from the Indian River, are part of a series of linear marshes running north-south and representing the "major repository" of stormwater drainage from contributing portions of Drainage Area The Background Analysis reports that these marshes function effectively as a surface water management area. Although on the landward side of the dune line, Drainage Area III is within the Indian River Lagoon Watershed because excess water in the area reverse flows into the lagoon during periods of very wet weather. According to the map of Vegetative Cover and Wildlife in the Background Analysis, seagrasses cover either the southeastern portion of the open space/wetlands south of Michigan Avenue or the adjacent land designated as medium-density residential. Noting historical encroachment on these wetlands, the Background Analysis concludes that continued encroachment will reduce the size of the storage capacity and increase the likelihood of outflow into the Indian River Lagoon. Drainage Area IV includes the wetlands found between the north end of Range Road and the largest unincorporated enclave within the City. These wetlands, which drain into the St. Johns River, are the site of Little Mud Lake. According to the Water Quality Protection Subelement of the Background Analysis, Little Mud Lake is largely a willow marsh with little or no open water. What water remains is probably of poor quality. However, the Background Analysis observes that the lack of adequate water quality data for all waterbodies in the City is itself a problem. Drainage Area V includes the largest contiguous wetlands within the City, which is the area north and west of the intersection of Michigan Avenue and Range Road. This area, which drains into the St. Johns River, surrounds Big Mud Lake, whose water quality is probably in poor condition, according to the Background Analysis. The Drainage Subelement of the Background Analysis acknowledges that the surface drainage systems for Cocoa have not been comprehensively inventoried since June, 1968. However, Drainage Area III is known to contribute about 29% of the stormwater runoff-generated pollutant loadings from the City to the Indian River Lagoon in the vicinity of the City. Although the wetlands serve as natural treatment and storage units, "[t]he continued loss of wetland areas will result in a corresponding decline in the overall effectiveness of the remaining wetlands to remove pollutants." (Drainage Subelement, Background Analysis, p. 4-30.) By way of comparison, Drainage III loads the Indian River Lagoon in the vicinity of the City with more than double the poundage of suspended solids than does the Jerry Sellers wastewater treatment plant in Cocoa. As to Drainage Area V, the Drainage Subelement warns that the salutary effect of Big Mud Lake, which serves as a natural treatment unit for stormwater pollutants, will be lost once the lake reaches its assimilative capacity to absorb or fix incoming loads of pollutants. According to the Water Quality Subelement of the Background Analysis, Big Mud Lake is probably eutrophic and "reduction of stormwater pollution . . . is probably the only means to restore [it]." (Water Quality Protection Subelement, Background Analysis, p. 6-62.) The Drainage Subelement concludes, however, that the impact of stormwater runoff-generated loadings is not expected to increase significantly and may even be reduced due to stormwater treatment requirements and stormwater retrofitting projects. However, existing stormwater treatment facilities serve only about 5.5% of the land area within the City, which depends heavily upon existing natural treatment systems for the management and control of stormwater problems. The Drainage Subelement offers 13 recommendations. Four of the first five recommendations suggest an inventory of existing stormwater drainage systems, evaluation of the effectiveness of current strategies, and projection of the impact of future growth on flow volumes. The fourth recommendation reads: Efforts should be undertaken to ensure the protection and preservation of existing wetlands in Drainage Areas #3, 4 and 5, with a priority being placed on the wetlands in Drainage Area #3. Applicable actions include modifications to existing zoning classifica- tions and provisions, land development regu- lations, stormwater, runoff treatment requirements, and other regulatory measures, as well as the possible acquisition of conservation or drainage easements in the wetland areas. (Drainage Subelement, Background Analysis, p. 4-37 and 4-38.) The Floodplain Management Subelement of the Conservation Element of the Background Analysis defines floodplains as those areas that become inundated by water on a recurring basis. The 100 year floodplain is an area that stands a 1% chance in any year that it will be subject to such inundation. The subelement notes that the addition of fill in the floodplains may raise flood elevations to an extent that flooding results to structures previously thought to be outside the floodplain. According to the Floodplain Management Subelement, 745 acres or 16% of the area of the City is located within the 100 year floodplain. Only 66 acres or about 9% of these floodplains are currently developed. Wetlands occupy 120 acres or 16.1% of the 100 year floodplain in the City. In assessing the future needs of Cocoa with respect to floodplains, the Floodplain Management Subelement expressly assumes that the "areas currently supporting open water or wetlands are clearly safe from development." (Floodplain Management Subelement, Background Analysis, p. 6-72.) This subelement concerns itself with the "several adverse consequences" of the development of the remaining 510 acres of undeveloped wetland upland within the 100 year floodplain. The Background Analysis warns that development within the 100 year floodplain "would be dependent upon the proper functioning of all drainage systems needed to overcome soils limitations" or else less severe storm events might result in recurrent flooding. Id. The Floodplains Subelement concludes that adverse consequences, such as flooding existing homes, can best be avoided by "limiting any development which requires the placement of fill" and encouraging the use of nonwetland upland floodplains as open space. Again concerning itself exclusively with nonwetland uplands within the 100 year floodplain, the subelement recommends "minimal development, such as very low density single family homes," to avoid future infrastructure problems due to flooding existing structures. (Floodplain Management Subelement, Background Analysis, p. 6-73.) Recreation and Open Space Element The Recreation and Open Space Element of the Background Analysis acknowledges that lands designated as open space may include wetlands. Conservation Element The Fisheries and Estuarine Subelement of the Conservation Element describes the Indian River Lagoon as a tidal estuary, whose brackish waters are an important resource for commercial and recreational fishing. The subelement notes that considerable amounts of seagrass cover have been lost, presumably due to human-induced environmental changes. One of the causes of the loss of seagrasses, which are a crucial component in the ecological food web of the estuary, is the discharge of inadequately treated stormwater. The Fisheries and Estuarine Subelement concludes that the pollutant discharges, which include stormwater, must be "reversed" if the estuarine resources are to be "maintained." The subelement contains a recommendation that existing drainage systems be improved and projects feasible only through dredging and filling of wetlands be prohibited, except for projects of overriding public interest. (Fisheries and Estuarine Subelement, Background Analysis, p. 6-50.) Coastal Management Element The Coastal Resources Subelement of the Coastal Management Element of the Background Analysis defines the coastal area for the subelement as the entire City. (Coastal Resources Subelement, Background Analysis, p. 5-5.) The subelement reports that shellfish were once harvested commercially through the entire Indian River Lagoon. However, due to the effects of urban and agricultural development, shellfish harvesting in the lagoonal waters adjacent to Cocoa is either restricted or prohibited. The subelement notes that the manatee, which is the only endangered mammal regularly inhabiting the Indian River, suffers from the loss of seagrasses, upon which the manatee grazes. The Coastal Resources Subelement states that the Indian River Lagoon receives little tidal flushing due to its distance from Sebastian Inlet. Thus, whatever pollutants are discharged into the lagoon remain indefinitely. In general, the water quality of the lagoon, according to one source cited in the Background Analysis, ranges from fair to poor. According to another source cited in the Background Analysis, the water quality is poor. The subelement reports that, by November, 1988, Cocoa was projected to complete the expansion of the Jerry Sellers wastewater treatment plant, whose effluent flows into the lagoon. The expansion was to increase the capacity of the plant by 80% of its present capacity. (Coastal Resources Subelement, Background Analysis, p. 5-10.) The Coastal Resources Subelement discloses that the Indian River Lagoons Field Committee was commissioned in 1985 to assist in the preparation of an integrated management plan for the lagoon, which extends over 156 miles through five counties and 40 municipalities. One of the committee's general recommendations is that local governments should include in their comprehensive plans the committee's recommendations for floodplain and critical area protection. (Coastal Resources Subelement, Background Analysis, p. 5-34.) Objections, Recommendations, and Comments of DCA Findings of Other Agencies Upon receipt of the Proposed Plan and supporting documents, DCA distributed them to various state, regional, and local agencies for comment, as part of the intergovernmental review process mandated by Section 163.3184(4) and (5), Florida Statutes. The Act gives these agencies 45 days within which to send their comments to DCA, which has an additional 45 days within which to transmit its objections, recommendations, and comments (ORC) to the local government submitting the plan. In the present case, DCA received responses from the Divisions of State Lands and Resource Management of the Department of Natural Resources (DNR); Comprehensive Planning Division of Brevard County; Regional Planning Council; Bureau of Historic Preservation of the Division of Historical Resources of the Department of State (the Department of State); Planning Department of the St. Johns River Water Management District (the Water Management District); Bureaus of Air Quality, Wastewater Management and Grants, Groundwater Protection, and Waste Planning and Regulation and Sections of Coastal Management and Drinking Water of the Department of Environmental Regulation (DER); Game and Fresh Water Fish Commission; and District 5-- Division of Planning and Programming of the Department of Transportation. DNR commented upon Policy 1.1.C, which as noted above in Paragraph 28 above provides that the City will adopt land development regulations to protect the wetlands identified in the Conservation and Future Land Use Elements. DNR stated that the policy "needs to project a long-term land use program to insure the protection of natural resources." DNR objected that the Coastal Management Element "contains no goal or objective addressing the protection, conservation, or enhancement of remaining coastal wetlands, living marine resources, . . . wildlife habitat, or the maintenance or improvement of estuarine environmental quality." The Regional Planning Council reported that Objective 6.4 in the Conservation Element lacks policies addressing the need to protect upland habitat adjacent to regionally significant wetlands, as required by Policy 43.8 in the plan of the Regional Planning Council. In a letter signed by Secretary of State Jim Smith, the Department of State determined that the Proposed Plan was inconsistent with the historic preservation aspects of the state comprehensive plan and failed to meet the requirements of the Act "regarding the identification of known historical resources . . . and . . . establishment of policies, goals, and objectives for historic preservation." The Department of State stated that Objective 3.1.4 of the Housing Element, which is quoted in Paragraph 33 above, lacks a specific plan of action for achieving its stated goal of preserving housing designated as historically significant. The Department of State faulted the Coastal Management Element for its failure to mention historical structures or archaeological sites and the Future Land Use Element and Map for their omission of known historical resources. The Water Management District stated that the Proposed Plan is "deficient with respect to water-related goals, objectives and policies required by Chapter 9J-5." With respect to the Future Land Use Element, the Water Management District noted the absence of objectives to ensure the protection of natural resources and policies to provide for drainage and stormwater management. The Water Management District found several items missing from the Coastal Management Element. These items included an inventory of the effect of the future land uses on natural resources; objectives protecting coastal wetlands, resources, and habitats; objectives addressing estuarine environmental quality; policies limiting the impacts of development upon wetlands; and policies identifying techniques for the protection of the Indian River Lagoon. The Water Management District concluded that this element did not appear to follow the requirements of Chapter 9J-5 as closely as did the other elements of the Proposed Plan. The Water Management District also objected to the Conservation Element on the grounds that it lacked specificity for the protection of existing natural resources and time frames for the treatment of untreated stormwater discharges, fisheries, wildlife, and wildlife habitats. DER commented generally that the Proposed Plan "appears to have important weaknesses." Referring to the Future Land Use and Capital Improvements Elements, DER noted the need for a number of studies regarding drainage, but the absence of any funds allocated for this purpose. DER also commented generally that "much of the work that identified potential areas for conservation, such as mapping the areas subject to flooding and areas with poor soil suitability or wetlands, was not carefully incorporated into the Future Land Use Element." DER objected that the Future Land Use Element is not based upon analyses of the effect of development and redevelopment of flood-prone areas and the character and magnitude of existing vacant or undeveloped land to determine its suitability for use. DER stated that the Future Land Use Element insufficiently analyzes the wetlands and floodplains identified elsewhere in the Proposed Plan. Findings of DCA General On August 5, 1988, DCA mailed to Cocoa the ORC, which contained 139 objections, the above-described objections and comments of the other state, regional, and local agencies, and general background information concerning the Act and the planning process. The ORC explains that objections relate to specific requirements of the Act or Chapter 9J-5. Each objection includes a recommendation of "one approach that might be taken" to address the objection. A comment is advisory in nature and does not form the basis of a determination of noncompliance. The ORC states that the City's public participation procedures are in violation of Rule 9J-5.004(2)(c) and (e). The objections states that the procedures lack provisions to assure that the public has opportunities to provide written comments and would receive responses to their comments. The ORC recommends that the City revise the procedures to include the necessary provisions. The ORC states that the format of the goals, objectives, and policies are in violation of Rules 9J-5.003(32), (57), and (64) and 9J-5.005(6). The objection states: Goals which do not state a long-term end towards which programs or activities are directed are not acceptable. Objectives which are not measurable, not supported by the data and analysis and are stated in an unspecific, tentative and/or conditional manner are unacceptable. Policies which are tentative or conditional, or do not describe the activities, programs and land development regulations which will implement the plan, are unacceptable. The accompanying recommendation adds: A goal must be written to state a long-term desired result [citation omitted]. Objectives must be written in a way that provides specific measurable intermediate ends that mark progress toward a goal [citation omitted]. A measure such as a quantity, percentage, etc. and a definite time period for its accomplishment should be included in the objectives. Policies answer the question of "how" by specifying the clearly defined actions (programs and activities) local governments will take to achieve each objective and ultimately the identified goal [citation omitted]. If desired, local governments may choose to assign the measurability to a policy . . .. [DCA] is primarily concerned that local governments provide the basis for assessing the effectiveness of their plan. When writing objectives and policies, avoid vague words and phrases (e.g., "adequate," "sufficient," "minimize," and "adverse impacts"), terms which nullify the strength of the statement (e.g., "consider" or "encourage"), or advisory words. "Should" implies an advisory statement which is inappropriate in an adopted portion of the plan. Using the term "shall" provides direction in implementing the plan and will make later evaluation and update of the plan an effective process. . . . The use of words like "ensure" and "encourage" leaves the what and how questions unanswered. [A]n objective cannot be phrased to "maintain or improve," one or the other actions might be set as an objective, but not both. Objectives and policies which are written using phrases such as "if needed," "whenever possible" and "where feasible and appropriate," or other vague words or phrases make the statements unacceptable because the conditional criteria making them specifically operational, have not been stated. 2. Future Land Use Element and Map Included in the background information accompanying the ORC is the following statement from DCA concerning the purpose of the future land use element: The purpose of the future land use element is the designation of future land use patterns as reflected in the goals, objectives and policies of all the comprehensive plan elements. Depicting the future land use patterns on the future land use map serves to (1) anticipate and resolve land use compatibility issues, and (2) provide the information necessary to determine the needed location and capacity of public facilities. (Major Issues--Local Government Comprehensive Planning, p. 3.) The ORC contains three objections and recommendations with respect to the data and four objections and recommendations with respect to the analysis contained in the Future Land Use Element of the Background Analysis. These objections cover the failure of both Existing Land Use Maps to depict natural and historic resources, which is in violation of Rule 9J-5.006(1)(a)6. and 11. The ORC contains seven objections and recommendations with respect to the goals, objectives, and policies under the Future Land Use Element of the Proposed Plan and three objections and a comment with respect to the Future Land Use Map. Two of the objections pertain to the two objectives of the Future Land Use Element. These objections, which are recited above in Paragraph 27, generally provide for the management of future growth through the implementation of unspecified land development regulations and require the direction of future development and redevelopment into appropriate areas as depicted on the Future Land Use Map. The ORC states that these objectives are unmeasurable and unsupported by the data and analysis in the Background Analysis, which is in violation of Rule 9J-5.005(3)(b). Another objection is that the Future Land Use Element of the Proposed Plan lacks objectives addressing the requirements set forth in the following rules: Rules 9J-5.006(3)(b)1.-8. These rules require, among other things, the coordination of future land uses with the appropriate topography, soil, conditions, and availability of facilities and services; and the protection of natural and historic resources. DCA also objects in the ORC to Policy 1.1, which is recited at Paragraph 28 above and calls for land development regulations protecting wetlands and regulating areas subject to flooding, among other items. The ORC states that Policy 1.1 fails to satisfy the definition of a policy set forth in Rule 9J-5.003(64) because it fails to specify how the programs and implementation activities would be conducted. The ORC asserts that Policy 1.1 is unsupported by the necessary data and analysis, in violation of Rules 9J-5.005(1)(a)6. and 10., 9J-5.005(1)((b)3. and 4., and 9J-5.005(2)(a). The missing data and analysis include: the uses of conservation and undeveloped land; the presence on existing land use maps of wetlands and floodplains; and the availability of any facilities and services, as identified in the Drainage Subelement, to serve existing land uses. The ORC states that the Future Land Use Element lacks policies addressing the requirements set forth in Rule 9J-5.006(3)(c)3. and 8. The former subsection requires a policy addressing implementation activities directed toward providing facilities and services to meet locally established level of service standards concurrent with the impacts of development. The latter subsection requires a policy addressing implementation activities directed toward identifying, designating, and protecting historically significant properties. As to the Future Land Use Map, the ORC identifies deficiencies similar to those cited regarding the Future Land Use Element with respect to a lack of support by the data and analysis. The deficiencies in the data and analysis include the failure to show all required land use categories, including conservation and historic resources, which are required by Rule 9J-5.006(4)(a); failure to show one land use category, the redevelopment area, that is described in the text; and omission of all required natural resources, such as floodplains and wetlands, which is in violation of Rule 9J-5.006(4)(b). Noting that the legend on the Future Land Use Map states that the map is intended as an adjunct to the Plan, DCA comments that the legend should reflect that the map will be adopted as part of the Plan. 3. Housing Element One of the objections to the data underlying the Housing Element in the Background Analysis is that they do not include an inventory of historically significant housing listed in the Florida Master Site File, housing designated as historically significant by a City ordinance, or the location of the single house that is listed on the National Register of Historic Places. All of this information is required by Rule 9J-5.010(1)(g). The ORC contains an objection to Objective 3.1.4, which is set forth in Paragraph 33 above. The ORC states that this objective, which promises the preservation of historically significant property, is unmeasurable. 4. Public Facilities Element The ORC sets forth six objections to the data and analysis underlying the Drainage Subelement of the Public Facilities Element of the Background Analysis. These objections point out the absence of data and analysis concerning the following items: the design capacity of the drainage facilities, which information is required by Rule 9J-5.011(1)(e)3.; the existing level of service standard provided by the drainage facilities, which information is required by Rule 9J-5.011(1)(e)5.; and the projected facility capacity, including surpluses and deficiencies, for the second increment of the planning period, which information is required by Rule 9J-5.011(1)(f)3. The ORC states that Objectives 4.3.5, 4.3.6, and 4.3.7 are unmeasurable and, as to Objectives 4.3.6 and 4.3.7, unspecific. These objectives, which are quoted in Paragraph 35 above, respectively deal with flood control, wetlands protection, and adequate surface water management facilities. The ORC is also critical of Policy 4.3.6.1, which is set forth in Paragraph 36 above and promises that the City will avoid infrastructure improvements that encourage wetlands development. DCA recommends that the Drainage Subelement show how the City will conduct the programs and implementing activities to avoid such infrastructure improvements. 5. Coastal Management Element Among the objections to the data underlying the Coastal Management Element of the Background Analysis is that the element lacks any inventory, analysis, or mapping of historic resources, which are required by Rule 9J- 5.012(2)(c). The ORC cites the failure of the Coastal Management Element to include policies addressing the requirements of Rule 9J-5.012(3)(c)1.-3., 8.-10., 13., and 14. These subsections require policies that, among other things, limit the specific impacts and cumulative impacts of development or redevelopment upon wetlands, water quality, wildlife habitat, and living marine resources; restore or enhance disturbed or degraded natural resources, including wetlands, estuaries, and drainage systems; regulate floodplains, stormwater management, and land use to reduce the risk of loss of human life and property as a result of natural hazards; protect historic resources by, among other things, identifying historic sites and establishing performance standards for the development and sensitive reuse of historic resources; and generally establish priorities for shoreline land uses. 6. Conservation Element The ORC contains an objection to Objective 6.5 of the Fisheries and Estuarine Habitat Subelement of the Conservation Element of the Proposed Plan. DCA finds this objective, which is cited in Paragraph 40 above and requires the protection of the Indian River Lagoon, to be unmeasurable and unspecific. The ORC states that the Conservation Element lacks policies to protect existing natural resources and designate environmentally sensitive lands for protection, which are required by Rule 9J-5.013(2)(c)7. and 9. 7. Capital Improvements Element The ORC notes one objection and recommendation to the data underlying the Capital Improvements Element of the Background Analysis. The objection states: Because data and analysis requirements were missing in the Drainage . . . Subelement, capital improvement needs cannot be adequately evaluated. Capital improvement needs for [this subelement] cannot be assumed to be nonexistent. The ORC states seven objections and recommendations to the analysis underlying the Capital Improvements Element of the Background Analysis. These objections generally concern a lack of information about costs and revenues. The ORC contains objections to Objectives 9.1, 9.2, and 9.7 as unmeasurable and, with respect to Objectives 9.2 and 9.7, unspecific. These objectives, which are quoted at Paragraph 44 above, deal generally with funding capital improvements required by level of service standards. The ORC cites the absence of an objective addressing the requirements of Rule 9J-5.016(3)(b)5. This rule requires an objective showing the local government's ability to provide or require the provision of the needed improvements identified in the Plan's other elements. The rule also requires an objective showing the local government's ability to manage the land development process so that the public facility needs created by previously issued development orders do not exceed the ability of the local government to fund or require the funding of capital improvements. DCA also objects to numerous policies in the Capital Improvements Element on the grounds that they are not measurable. 8. Miscellaneous DCA objects in the ORC that the Proposed Plan lacks goals, objectives, and policies that further numerous policies of the Regional Comprehensive Policy Plan of the Regional Planning Council. Review of ORC and Adoption of Plan Review of ORC Within a few days after receiving the ORC from DCA, Cocoa forwarded the relevant portions of the Proposed Plan to the consultants who had prepared them for the preparation of responses and revisions. On or about August 31, Cocoa received the responses and revisions from the consultants. As noted in Paragraph 46 above, the procedures in effect at this time were those contained in Ordinance No. 4-80. On August 23, 1988, the City Council postponed until its next meeting consideration of a new ordinance establishing procedures for adopting amendments to the Proposed Plan. On August 31, 1988, a 1 1/4" by 8 1/4" classified-type advertisement announced a meeting of the Planning and Zoning Board on September 14, 1988, at 5:15 p.m. for the purpose, among other things, of recommending to the City Council changes to the nine elements of the Proposed Plan. The advertisement stated that the City Council will consider the recommendations of the Planning and Zoning Board during its regularly scheduled meeting on September 27, 1988, at 7:00 p.m. The advertisement advised that the Plan documents, including the Future Land Use Map, were available for public inspection at the Community Improvement "Office." On September 1, 1988, a 6 1/2" by 10 1/2" display advertisement provided the same information as that contained in the advertisement published the prior day. The display advertisement stated: The City urges any citizen to review the Plan documents and submit written or oral comments at any time during the process. Such comments will be presented during the hearing along with response as appropriate. All citizens will be given the opportunity to review the documents, have legal notification, submit written or oral comments, and receive appropriate responses to items related to elements to be adopted by the City as the City's Comprehensive Plan. The display advertisement bore a large, boldface headline in block print, stating: "NOTICE OF CHANGE IN LAND USE." The advertisement contained a large map of the City. A 6 1/2" by 4" version of the same advertisement appeared elsewhere in the same edition of the newspaper. At the regular meeting of the City Council on September 13, 1988, Ms. Koons, on behalf of Petitioners Austin, Houston, and Dorn, complained about the limited opportunities for public participation, in part caused by the lack of current information available to the public. In response, the City Council announced the dates of September 27 and October 4, 5, or 6 for the adoption hearings for the Plan. Richard Amari, the City Attorney, reminded everyone that the Act gives local governments only 60 days following the issuance of the ORC within which to adopt the Plan. He said that Cocoa was not trying to bypass public participation, but had to comply with the law. At the September 13 meeting, the City Council adopted Resolution No. 88-31, which became effective the same date. The resolution provides in relevant part: Section 1. The City will advertise pursuant to Florida State Statutes and Department of Community Affairs Rule 9J-5. Section 2. The City will post notices of its public hearings in City Hall, Library and Police Department regarding consideration of the Comprehensive Plan. Section 3. The City will provide in its ads encouragement for written and oral comments by the public which written comment will be made part of the public record. Section 4. The City Manager or his designee will assure that responses to written comments received during the process will be given either at the public hearings as appropriate or written responses may be given upon request. Section 5. The plan documents are available for public inspection at City Hall in Rooms 208 & 202, and the Cocoa Public Library during normal business hours. Section 6. This Resolution shall govern activities engaged in by the Planning and Zoning Board acting as the Local Planning Agency during its public hearing on September 14, 1988, and continued from time to time; and by the City Council at its Public Hearing on September 27 as may be continued from time to time. On September 14, 1988, the Planning and Zoning Board conducted a public hearing concerning, among other items, the Plan. The scarcity of Plan documents, especially the Future Land Use Map, limited the amount of meaningful participation by members of the audience and, to a lesser extent, the Board. The Future Land Use Map is a color-coded document. A black and white photocopy of the map incompletely depicts the various land uses shown on the map. An ongoing problem through the planning process was that these color maps, which were prepared for the City by the Regional Planning Council, were not generally available to the public. However, during most if not all of the process, Ms. Lawandales maintained in the Community Improvement Department a large color map, which was generally current. Part of the problem was the City's inability or unwillingness to incur the cost and suffer the inconvenience of printing new maps every time that there was a change in the use assigned to a parcel. Such changes were frequent in the final weeks before adoption of the Plan. At the September 14 meeting, for instance, there was already a handwritten list of 20 numbered proposed changes to the Future Land Use Map. Item 10 of the proposed changes converts from open space to medium- density residential most of the southeast quarter of the open area located north of Michigan Avenue and west of U.S. Route 1, which is part of the linear marsh wetlands within Drainage Area III. The September 14 meeting was a scene of some confusion due to the above-described documents. One Board member moved that the public be given at least those documents that the Board had. The motion failed. In part due to time constraints and limited staff resources, the Board decided instead to copy for the public only the maps and revisions and responses to the goals, objectives, and policies. The meeting adjourned by a 4-2 vote before considering the Future Land Use Map. Two Board members remained after the meeting to share their Future Land Use Maps with the audience. A few days later, City staff persons compiled a large notebook with a complete set of documents related to the Plan and distributed these notebooks to the members of the City Council. These documents consisted of the goals, objectives, and policies of the Proposed Plan; the unrevised Background Analysis; the responses and revisions to the goals, objectives, and policies as a result of the ORC; the EAR; and possibly other documents. On September 18, 1988, a 10 1/2" by 6 1/2" display advertisement announced three workshops and two public hearings to be held by the City Council. The workshops were set for September 19 at 7:00 p.m., September 20 at 5:00 p.m., and September 22 at 6:30 p.m. The first workshop would cover the Public Facilities, "Transportation" (i.e., Traffic Circulation), and Capital Improvements Elements. The second workshop would cover the Coastal Management, Conservation, and Recreation and Open Space Elements. The third workshop would cover the Future Land Use, Housing, and Intergovernmental Coordination Elements. The advertisement stated: "The general purpose of the workshops is to receive public comments and review the Comprehensive Plan." Some local residents were aware of the three workshops at least one day prior to the publication of the advertisement. The same advertisement announced that the public hearings would take place on September 27, 1988, at 7:00 p.m. and October 4, 1988, at 6:00 p.m. The advertisement stated: The purpose of these hearings is to receive public comments and recommendations on a Comprehensive Plan, and to review and adopt an ordinance adopting the Comprehensive Plan in accordance with the requirements of growth management and land development legislation adopted by the Florida Legislature in 1985 and 1986. On September 19, the Planning and Zoning Board and City Council jointly conducted a workshop on the Public Facilities, Traffic Circulation, and Capital Improvements Elements. Mayor Robinson acknowledged the receipt of a petition of residents from two subdivisions in opposition to changes to their neighborhoods by the Plan. Mayor Robinson informed the audience that the Future Land Use Map would be discussed at the September 22 meeting. The format of the September 19 workshop, as well as the two other workshops, was that City staff would first address an issue, followed, in order, by City Council members, Planning and Zoning Board members, and lastly the audience. City staffpersons at the September 19 workshop identified a list of 38 recommended changes to the Future Land Use Map. Item 10 from the September 14 list was renumbered as Item 7. Item 6 on the September 19 list encompasses what remained of the eastern half the open space north of Michigan Avenue. The recommendation is to designate this wetlands area commercial. The northern tip of the linear marsh wetlands area south of Michigan Avenue and west of U.S. Route 1 is proposed to be redesignated commercial in new Item 10. Item 11 proposes that the remainder of this open space/wetlands be redesignated medium- density residential. The recommended changes appearing at the September 19 workshop substantially eliminate the two other open space/wetlands, as well. Item 33 recommends low-density residential for most of the southern half of the open space/wetlands located between Range Road and the largest unincorporated enclave within the City. Item 34 recommends medium-density residential for most of the northern half of the same open space/wetlands. According to the Soils Map contained in the Background Analysis, the northern portion of Little Mud Lake is in the medium-density residential area and the southern portion of the lake is in the low-density residential area. After these two changes, about one quarter of the original open space/wetlands between Range Road and the unincorporated enclave retains the originally proposed designation as open space. The remaining open space is an L-shaped strip immediately adjacent to the unincorporated area within the City. According to the Existing Land Use Map in the Background Analysis, the portion of the L-shaped strip running north-south is devoted to recreational uses, such as a park. Items 37 and 38 recommend the complete elimination of the largest open space/wetlands, which is located north and west of the intersection of Michigan Avenue and Range Road and is within Drainage Area IV. Item 37 proposes that nearly all of this open space/wetlands, including Big Mud Lake, be redesignated low-density residential. Item 38 proposes that the western portion of this open space/wetlands be redesignated medium-density residential. On September 20, 1988, the Planning and Zoning Board and City Council jointly conducted a workshop on the Coastal Management, Conservation, and Recreation and Open Space Elements. Discussion included the redesignation of the open space/wetlands in the vicinity of Michigan Avenue from open space to medium-density residential and commercial. At the conclusion of the meeting, the City Council agreed to add another parcel to the list of recommended changes to the Future Land Use Map. On September 22, 1988, the Planning and Zoning Board and City Council jointly conducted a workshop on the Housing, Future Land Use, and Intergovernmental Coordination Elements. Ms. Koons, on behalf of Petitioners Austin, Houston, and Dorn, objected at this workshop to the Future Land Use Element, as well as other matters. Petitioner Houston herself spoke against the Future Land Use Map. A Future Land Use Map was present at this workshop. This map, reflecting the latest addition, showed 39 numbered areas marked in black. The numbers corresponded to the list of recommended changes to the Future Land Use Map. The City Council authorized during the workshop the addition of two more proposed changes. The September 22 workshop marked the last involvement of the Planning and Zoning Board in the planning process. The Board never formally recommended the Plan and supporting documents to the City Council for adoption. However, by the end of the meeting, none of the Board members expressed any remaining objections to the Plan and supporting documents, and most if not all Board members had no serious objections to the Plan. A formal recommendation was therefore unnecessary. Adoption Hearings On September 23, 1988, a display advertisement nearly identical in size and content to that published on September 18 stated that the City Council would conduct public hearings on September 27, 1988, at 7:00 p.m. and October 4, 1988, at 6:00 p.m. on changes in the use of land within the City limits. A similar display advertisement on September 29, 1988, announced the October 4 public hearing. The City Council received a list of 41 proposed changes to the Future Land Use Map at the September 27 hearing and approved the addition of a another property, as well as unrelated revisions to the Wastewater Element. In a presentation to the City Council, Ms. Lawandales referred to a set of revisions to the Future Land Use Element. These revisions were not the same as those prepared by the Regional Planning Council. Ms. Lawandales referred in her presentation to a set of revisions that add only two short clauses to the goals, objectives, and policies of the Future Land Use Element. At the October 4, 1988, public hearing, the City Council received written objections from Ms. Koons, on behalf of Petitioners Austin, Houston, and Dorn, in the form of an eight-page letter. Given the detail and scope of the letter and lack of time, the City Council and staff were justifiably unable to offer a response until after the hearing, which concluded with the adoption of the Plan. During the hearing, the City Council approved the addition of five more properties to the list of 42 recommended changes to the Future Land Use Map. At the conclusion of the October 4 hearing, the City Council adopted the Plan by adopting Ordinance No. 20-88, which in relevant part provides: Whereas, after months of careful review and a public hearing the Planning and Zoning Board sitting as the Local Planning Agency has recommended adoption of the new Comprehensive Plan in substantially the form presented; and Whereas, the City Council has received objections, recommendations, and comments from the [Regional Planning Council, DCA], and various other agencies; and * * * Whereas, the City Council has made certain amendments in the proposed new Comprehensive Plan in light of [public comments], as well as the comments, recommendations, and objections of the [Regional Planning Council, DCA], and various other State agencies; * * * Now, therefore, be it enacted by the City Council of the City of Cocoa, Brevard County, Florida, that: Section 1. That Section 15-4 of the City Code of Cocoa is hereby amended to read as follows: Sec. 15-4 Adoption of Comprehensive Plan. The City's Comprehensive Plan consists of the one (1) volume book entitled Comprehensive Plan--City of Cocoa, Volume II, April 1988, which Comprehensive Plan consists of (i) Goals, Objectives and Policies for nine (9) elements, including Future Land Use, Traffic Circulation, Housing, Public Facilities, Coastal Management, Conservation, Recreation and Open Space, Intergovernmental Coordination and Capital Improvements, (ii) Procedures of Monitoring and Evaluation, (iii) Requirements for Consistency of the Local Comprehensive Plan, and (iv) Population estimates and projections utilized as basis for the plan documents, plus the Evaluation and Appraisal Report dated April, 1988. Section 2. Attached hereto and incorporated herein by this reference is the City's Comprehensive Plan as referenced in Section 1 of this Ordinance, which Comprehensive Plan is hereby adopted as the official comprehensive plan for and of the City. * * * Section 4. Ordinances and Resolutions in Conflict. All Ordinances or Resolutions or parts thereof that may be determined to be in conflict herewith are hereby repealed. The City's Comprehensive Plan approved with the adoption of Ordinance No. 11-80 of July 8, 1980, all as the same may have been amended from time to time, be and the same is hereby repealed. Section 5. Effective Date. This Ordinance shall become in full force and effect immediately upon its adoption by the City Council. Adopted by the Council of the City of Cocoa, in regular meeting assembled, on the 4th day of October, 1988. The ordinance is signed by Mayor Robinson, whose signature is attested by the City Clerk. The review and adoption proceedings ended with the October 4 hearing. At no time during these proceedings did Petitioner David P. Hendry, Sr. or Loula P. Hendry submit oral or written objections to the Plan or Proposed Plan. On or about August 13, 1988, Petitioner David P. Hendry, Sr. sent a letter dated July 31, 1988, to Cocoa and numerous other state and local officials. In the letter, he objected to a marina project that was under consideration. However, these comments did not constitute objections to the Plan or Proposed Plan, of which Petitioners Hendry were unaware until after it had been adopted by the City and determined to be in compliance by DCA. The Contents of the Plan General Besides the goals, objectives, and policies, the Plan consists of the EAR (described in Paragraphs 157-169), Resolution No. 88-31 (described in Paragraph 115), population data (described in Paragraph 170), a section entitled "Consistency of the Local Plan with the State Comprehensive Plan" (described in Paragraph 171), and a section entitled "Monitoring and Evaluation (described in Paragraph 46). The Plan is also supported by the data and analysis contained in the Background Analysis, portions of which are described in Paragraphs 47-67 above. The City submitted revisions to the Background Analysis, portions of which are described in Paragraphs 172-180 below. Goals, Objectives, and Policies The goals, objectives, and policies of the Plan are those of the Proposed Plan, as revised by the City Council. The revisions are as follows: 47 changes to the Future Land Use Map, as identified in Austin Exhibit 10; numerous revisions to the goals, objectives, and policies of the Proposed Plan, as identified in Austin Exhibit 10; two revisions to the proposed Future Land Use Element, as identified in Cocoa Exhibit 4; and revisions to the Solid Waste and "Sanitary Sewer" (i.e., Wastewater) Subelements of the Public Facilities Element, as identified in Cocoa Exhibit 4. There are no other revisions, additions or deletions affecting the goals, objectives, and policies of the Plan. The revisions described in Paragraph 181 below were never adopted by the City and are not part of the Plan. Responses, which are set forth in Austin Exhibit 10, are explanations offered by the City in response to objections and recommendations of DCA; responses do not contain any goals, objectives, or policies. Future Land Use Element and Map One response concerning the Future Land Use Element explains that objections in the ORC to missing data have been satisfied by a revision of the underlying data and analysis. However, as to objections with respect to the failure of the Future Land Use Map to depict conservation and natural resources, the response is that "no . . . conservation or historic resource land use categories are applicable for the city." However, the revised analysis underlying the Future Land Use Element includes a map of the Cocoa Historic District. The response to the objection that the Future Land Use Map fails to show all required natural resources is: "Wetlands are not a designated future land use." The revisions to the goals, objectives, and policies of the Future Land Use Element include revised Objectives 1.1 and 1.2, which are set forth in their proposed form in Paragraph 27 above. These revisions require that the City accomplish the tasks described in the two objectives within one year of Plan submittal. The revisions to the goals, objectives, and policies of the Future Land Use Element contain four new objectives. Objectives 1.3 and 1.4 respectively deal with the elimination by the year 2000 of blight and existing land uses that are inconsistent with the Future Land Use "Plan." Objective 1.5 states that within one year of Plan submittal all development activities "will be consistent with and supportive of the Plan's objectives for protecting natural and historic resources." Objective 1.6 states that within one year of Plan submission land development regulations will provide for the availability of sufficient land area for the siting of public facilities. The revisions contain several new policies. New Policy 1.1.3 allows the City to issue development orders only if the necessary public facilities, operating at the adopted levels of service, are available concurrent with the impacts of the development. New Policy 1.5.1 states that the City will identify its historical resources and maintain an updated file of historically significant properties. New Policy 1.5.3 provides that the City will protect its cultural, historic, and archaeological resources by helping to educate the public of the value of such resources, considering the establishment of a historic district, and purchasing development rights to preserve historically significant properties. Revisions also clarify that open space/residential areas on the Future Land Use Map will be used for park, recreational, and ancillary uses, except as required for other public purposes. 2. Housing Element The City Council adopted several revisions to the goals, objectives, and policies of the Housing Element. Objective 3.1.4, which in its original form is set forth in Paragraph 33 above, is revised to provide that the quality of existing homes and neighborhoods will, at a minimum, be maintained, rather than maintained or improved. Policy 3.1.4.7, which is also set forth in Paragraph 33, is revised to add that the City will perform an annual review of historically significant housing units in order, as previously provided, to aid in the identification of historically significant housing and structures. 3. Public Facilities Element Objectives 4.3.5, 4.3.6, and 4.3.7 are revised as follows with the new language underlined: Objective 4.3.5: To reduce existing flooding problems and to prevent additional flooding problems from being created as a result of future development through actions identified in needs assessments and engineering studies, with the actions being undertaken on a priority basis as determined in the engineering studies, with individual prioritized actions being initiated no later than one year following the completion of the engineering studies, consistent with the schedule of actions contained in the Comprehensive Improvements Plan [sic]. Objective 4.3.6: To ensure the protection and preservation of existing wetlands as viable components of the City's surface water management systems, to include the establishment or maintenance of desirable hydroperiods, water quality conditions, and natural ecosystems applicable ordinances (including design criteria and standards) will be submitted for adoption consideration no later than October 1, 1990, with final adoption within one year following the initial submittal. Objective 4.3.7: To ensure the proper and adequate surface water management facilities are provided in response to identified needs existing deficiencies and needs will be determined, cost and time requirements of corrective actions will be identified, and alternative sources of revenue will be evaluated, with the above information being compiled into a Surface Water Management Plan for the entire City and any external service areas by October 1, 1995. The revision of another objective reiterates the intention of the City to perform engineering studies in the future to gain information necessary to drainage planning: Objective 4.3.2: To protect, preserve or improve the quality of surface drainage waters being discharged from existing and future drainage systems in the City so that such discharges do not contribute to the degradation of water quality conditions in receiving waterbodies or prevent the improvement of degraded conditions, and promote the continuance or establishment of healthy, balanced natural environments through the implementation of ordinances, engineering studies, inspection programs, and coordinative actions with regulatory agencies, with such activities being initiated no later than October 1, 1992. Revisions to several policies show an increasing recognition of the need to plan for drainage and the role of wetlands in such a plan: Policy 4.3.2.6: Proposed development plans will be thoroughly reviewed to ensure that new development does not adversely impact surrounding properties by altering drainage patterns and water storage capabilities so that increased volumes of water are discharged onto the properties or that surface drainage flows from the properties are not impeded or retarded so as to create or contribute to flooding or diminished land usage, unless such lands have been purchased or designated by the City for surface water storage purposes. Policy 4.3.4.3: The City will actively participate in the preparation and implementa- tion of applicable Surface Water Improvement and Management (SWIM) plans being undertaken by the [Water Management District] which will [replacing "would"] involve or include land areas in the City or waterbodies affected by drainage from the City. Policy 4.3.6.1: Public infrastructure improvements that encourage the development of wetlands will be avoided except in the case of overriding public interest, for the purpose of protecting and preserving wetland areas with appropriate measures such as ordinances and development standards being used [replacing "taken"] to control [replacing "discourage"] development in affected wetland areas. Policy 4.3.6.3: The City will review its existing land development design criteria, and revise if necessary, to provide for and encourage the incorporation of existing wetlands into land development plans for the use of "free services" offered by the natural areas provided that: --intrinsic natural wetland values, functions and hydroperiods are not adversely affected, --the wetland is maintained in its natural condition, and --the wetland is protected from future development. 4. Coastal Management Element The revisions add a new goal, objective, and policies that provide: Goal 5.3: The natural resources of the City's coastal area shall be preserved, protected or enhanced to provide the highest possible environmental quality for recreation and the propagation of fisheries and wildlife. Objective 5.3.1: The City shall protect, and restore where necessary, the following natural resources and environmental attributes within its control: air quality, endangered species and their habitat, native vegetation and wildlife, fisheries and estuarine habitat, water quality, and floodplains. New Policy 5.3.1.1 incorporates Objectives 6.1 and 6.2-6.9 and the policies thereunder. The revisions contain another new objective and policies under the new goal described above. Policy 5.3.2.3 states that the City will conform its plan and development criteria to the guidelines set forth in yet-to-be identified resource protection plans to the extent "legally permissible." Policy 5.3.2.4 states that the City shall notify the Resources Council of East Florida and the Indian River Aquatic Preserve of all proposed activities that the City Council considers will directly affect the coastal zone, including changes in stormwater discharge, vegetation removal, or dredge and fill operations. 5. Conservation Element Objective 6.5 of the Fisheries and Estuarine Habitat Subelement, which is quoted in its original form in Paragraph 40 above, is revised as follows: Objective 6.5: By 1993, the abundance and diversity of submerged aquatic vegetation and fish species found in the City's lakes, and in the Indian River within the zone between the Cocoa shoreline and the Intracoastal Waterway, shall be as great, or greater, than they were in 1988. The City cites eight policies under Objectives 6.4 and 6.8 in response to the objection that the Proposed Plan lacks policies addressing the protection of existing natural resources and designating for protection environmentally sensitive land. 6. Recreation and Open Space Element The revisions to the Recreation and Open Space Element contain a new objective concerning open space: Objective 7.2.1: Within one year of Plan submittal the land development regulations will include provisions for addressing the open space needs of the City. 7. Capital Improvements Element The revisions to the Capital Improvements Element include requirements that the City satisfy the requirements of Objectives 9.1 and 9.2, which are set forth in Paragraph 44 above, by 1989 and 1990, respectively. The City revised Objective 9.1 to require, by 1989, the incorporation of levels of service standards into land development regulations. Also, the City added the following language to Objective 9.5, which is quoted in its original form at Paragraph 44 above: "Public Facility needs created by development orders issued prior to Plan adoption will not exceed the ability of the City to fund or provide needed capital improvements." Evaluation and Appraisal Report The EAR, which is referenced in Paragraph 24 above, evaluates the success of an earlier, unrelated comprehensive plan previously adopted by the City. The EAR begins with an introductory section commenting about the area and problems facing the City. The introduction notes that the City has significant undeveloped lands, especially in the northwest section of Cocoa. A large part of these lands is the single open space/wetlands north of Michigan Avenue and west of Range Road. The EAR states: "Much of the land is not developable due to natural constraints; however, primary residential growth will occur in this area in the future." The introduction also recognizes that "drainage is still a major concern" due to the "extensive amount of new development and alteration of some natural drainage systems, as well as continued drainage problems from older development." Among the solutions noted in the introduction are the requirement of retention and detention areas in new developments. Concerning conservation and protection of the coastal zone, the introduction states: The City of Cocoa has continued to seek to protect the integrity of the flood hazard areas as significant development has not occurred in these areas as of this date. Maintaining these areas for natural functions, it will decrease the possibility of flooding and associated problems during heavy cycles of rain. This also adds to the water quality of the area. The major portion of the EAR is devoted to an evaluation of the success of the prior comprehensive plan. Several relevant portions of this self-assessment, which was updated on September 27, 1988, are set forth in the following paragraphs. Objective 2 under Open Space was to "develop flood plain controls which will allow for the protection of some open space around Cocoa's lakes and low areas in the event of development." The result: not accomplished. Objectives 2 and 3 under the Conservation/Coastal Element were to use the City's water retention ordinance to control surface drainage from new developments and continue to make needed drainage improvements. The results: the first objective was accomplished and the second objective was not accomplished as of April, 1988. However, as to the second objective, as of September 27, 1988, "a drainage improvement program has been initiated." Objective 3 under the Land and Vegetation Resources was to control the amount of filling that could occur in new development to ensure proper drainage in surrounding areas. The result: not accomplished in April, 1988, and partly accomplished by September 27, 1988. Objective 1 under Drainage was to develop a citywide Master Drainage Plan with priorities and cost estimates for drainage improvements needed in Cocoa. The result: not accomplished. Objective 3 under Drainage was to control activities in flood prone areas in an effort to prevent a detrimental impact on areawide drainage patterns. The result: not accomplished. Objective 4 was to encourage, as feasible, the use of natural filtration, detention, and retention to reduce runoff-associated drainage problems. The result: accomplished. Objective 11 under Intergovernmental Coordination was to adhere to statewide plans and programs designed to control nonpoint sources of water pollution and prevent alteration of areawide drainage patterns. Result: not accomplished. Miscellaneous The Plan includes the population history and estimates that had been provided with the transmittal of the Proposed Plan in April, 1988. This document is included in Cocoa Exhibit 4. The Plan includes the Consistency of the Local Comprehensive Plan with the State Comprehensive Plan that had been provided in April, 1988, at the end of the City of Cocoa--Comprehensive Plan, Volume II . This document is a cross-index between provisions of the Plan and the state comprehensive plan. Background Analysis In reply to objections and recommendations in the ORC pertaining to the Background Analysis, the City supplemented its data and analysis through revisions. Shortly after the Plan had been adopted and transmitted, the City sent to DCA the revisions to the data and analysis and responses to the objections and recommendations concerning data and analysis. Future Land Use Element and Map In response to the objection that the data omitted conservation uses and historic resources, the City states that there are "no conservation uses" and supplies a map depicting existing historic resources. Elaborating upon the historic resources, the City mentions a survey of historic structures that took place in November, 1987. The resulting list of 72 structures is depicted on a map, which is included in the response and entitled, "Cocoa Historic District." An inventory of the properties is included. In a narrative response to an objection to the absence of an analysis of the need for redevelopment, the City describes its earlier redevelopment efforts, which include the adoption of a redevelopment plan, pursuant to Chapter 163, Part III, Florida Statutes. Noting the objectives of the redevelopment plan as to the elimination of slums and blighted conditions, the narrative concludes: "These goals should be retained and reiterated in the goals, objectives and policies section of the Comprehensive Plan." 2. Housing Element The revised Background Analysis contains a long narrative concerning housing. At the end, the City states that it should take "appropriate measures" to preserve and protect the Porcher House, which is the only structure in the City listed on the National Register of Historic Places, and maintain the quality of older neighborhoods in order to preserve other potentially significant property. 3. Drainage Subelement Responding to an objection that the data and analysis fail to include the capacity allocated to meet the City's drainage needs for the ten-year planning horizon, the City added the following language: However, information is not currently available for future allocation and usage during the ten-year planning period. The available information is insufficient to accurately determine the proportion of design capacities currently being used to handle runoff and groundwater flows in the drainage system components. 4. Capital Improvements Element Elaborating upon its earlier responses to the objections to the Drainage Subelement of the Background Analysis, the City states that "[t]here are no planned capital improvements for the drainage system." The City refers to attached materials in response to numerous objections to the omission from the analysis of future revenue and expenditures available for needed capital improvements. However, such material was not included with the revisions and responses. 5. Coastal Management Element The glossary added to the Background Analysis by the revisions reiterates the statement in the original Background Analysis, noted at Paragraph 65 above, that the coastal area for the Coastal Resources Subelement is the entire City. (The reference to "Rockledge" is a typographical error; the Regional Planning Council, which drafted the Background Analysis and revisions, was working at the same time on the Rockledge comprehensive plan.) (Responses to DCA Comments, p. 12-6.) 6. Miscellaneous In responding to objections to the data and analysis concerning the consistency of the Plan with the plan of the Regional Planning Council, the City cites a new Objective 6.3 with new Policies 6.3.1-6.3.5 and 6.4.9. These items, which generally deal with ensuring the persistence through 1998 of the 1990- level distribution and abundance of endangered and threatened species and their habitats in the City, were neither considered nor adopted by the City Council. Objective 6.3 and Policies 6.3.1-6.3.5 and 6.4.9 are therefore not part of the Plan. Determination of Compliance by DCA After receiving the Plan and supporting documents shortly after October 4, 1988, DCA analyzed the revisions and responses in light of the 139 objections and recommendations contained in the ORC. At the conclusion of the analysis, DCA found that 28 of the revisions and responses were inadequate. These findings are set forth in the Preliminary Findings on the Cocoa Comprehensive Plan, which is dated November 16, 1988. On November 26, 1988, DCA published, by way of a 10 1/2" by 6 1/2" advertisement, its Notice of Intent to Find the City of Cocoa Comprehensive Plan in Compliance. The advertisement complies with the statutory requirements. Ultimate Findings as to Public Participation The public participated in the comprehensive planning process to the fullest extent possible. The City Council adopted procedures to provide effective public participation, including notice to real property owners of all official action affecting the use of their property. Any deficiency in the procedures is immaterial. The Planning and Zoning Board duly discharged its responsibilities as the local planning agency under the Act. The City Council and Planning and Zoning Board amply advertised their many public hearings and provided reasonable opportunity for written comments and open discussion. Comments from the public appear to have received fair consideration. The City disseminated proposals and other information as broadly as possible, although certain materials were available at times only to staff and not the City Council, Planning and Zoning Board, or public. The City was confronted with a substantial task involving the identification, consideration, and resolution of complex technical and legal questions. The City prudently delegated much of the work to City staff and outside consultants. The Act generates severe time pressures, especially on the local government, which has only 60 days to digest the ORC and adopt a plan. Once the City received the ORC, about half of the 60 days was spent by the staff and outside consultants in drafting proposed revisions and responses. Neither City Council or the Planning and Zoning Board could realistically commence public meetings until the members had reviewed the work of the consultants and staff. Critical land use decisions such as those involved in the adoption of a comprehensive plan are politically sensitive. The land use decisions in this case generated considerable controversy in the community. Members of the City Council or the Planning and Zoning Board could not reasonably be expected to commence public meetings before they were aware of what revisions and responses were being proposed by their experts. The greatest shortcoming in the public participation process involved the ongoing proposed changes to the Future Land Use Map and the inability or unwillingness of the City to disseminate in a timely manner updated maps reflecting these proposed changes. Broader and more timely dissemination of the proposed changes would have facilitated more careful consideration of the effects of redesignating the uses of large parcels of land. However, the real target of the frustrations expressed with the public participation process is with the resulting land use decisions, not the process itself. Even in light of the shortcomings with respect to the revisions to the Future Land Use Map, the public participated in the process to the fullest extent possible under the circumstances described above. Ultimate Findings as to Consistency Drainage, Wetlands, and Floodplains Internal Consistency The Plan is internally inconsistent with respect to drainage, wetlands, and floodplains. These inconsistencies render the Plan inconsistent in the related matters of protecting the estuarine waters of the Indian River Lagoon; fisheries, wildlife, and vegetation habitat; and general water quality. In general, the inconsistencies result from the conflict between Plan provisions protecting wetlands, restricting floodplain development, and ensuring adequate drainage, on the one hand, and, on the other hand, the elimination of nearly all of the existing open space/wetlands from, and the failure to depict wetlands as a natural resource on, the Future Land Use Map. Many Plan provisions assure the protection of wetlands, adequacy of drainage, and restriction of development in the floodplains, as well as the protection of the estuarine waters of the Indian River, various habitats, and general water quality. For instance, Policy 1.1.B protects the wetlands identified in the Conservation and Future Land Use Elements. Objective 1.5 requires that development activities will be consistent with and supportive of the Plan's objectives for protecting natural resources. Objective 4.3.6 promises ordinances to ensure the protection of wetlands. Policy 4.3.6.1 restricts public infrastructure funds that encourage the development of the wetlands. Goal 5.3 and Objective 5.3.1 provide for the protection and restoration of estuarine habitats and floodplains. Policy 6.4.7 prohibits any development that significantly and adversely alters the function of the wetlands. Objective 6.5 requires that the condition of the Indian River, in terms of its ability to support numbers and types of aquatic vegetation and fish, be maintained or improved between now and 1993. Policy 6.5.3 requires that the City take steps to reduce the volume of untreated stormwater. Objective 6.8 ensures the protection of the flood storage and conveyance capacities of the 100 year floodplain. However, the protection guaranteed wetlands, floodplains, and drainage is contradicted by the treatment of wetlands in The Future Land Use Map. The map is a critical component of the Plan. According to both Objective 1.2 and the Background Analysis, the Future Land Use Map will provide the rationale for all future land use decisions when the City implements the Plan with land development regulations. The Future Land Use Map is at least as important as goals, objectives, or policies in setting the course for future development and redevelopment in Cocoa. The Future Land Use Map subordinates all but a small section of the wetlands in the City to residential and commercial land uses. The City could have extended effective protection to the wetlands by reserving them a place in Cocoa's future. First, the City could have shown them as a natural resource on the Future Land Use Map. Second, the City could have shown them as a conservation land use on the Future Land Use Map. The failure to take these steps was not inadvertent. The ORC pointed out both of these omissions. In the Proposed Plan, the City chose to designate the wetlands as open space, which provided some protection. Even so, DCA objected to the omission of a conservation land use category from the Future Land Use Map, as required by Rule 9J-5.006(4)(a). The City's response: "No . . . conservation . . .land use categories are applicable for the city." DCA also objected to the failure to show on the Future Land Use Map all required natural resources, which include wetlands under Rule 9J-5.006(4)(b). The City's response, which betrays a failure to comprehend the difference between a land use category and a natural resource: "Wetlands are not a designated future land use." These "explanations" are hardly consistent with overall protection of the wetlands or, specifically, with such provisions as are contained in Policy 7.2.1.2, which provides that the City will "[d]esignate conservation areas . . . as part of the future land use map in order to preserve open space and fulfill . . . [Conservation Element] objectives." As the Future Land Use Map presently stands, the City will soon adopt land development regulations consistent with the use of nearly all of its wetlands for low- and medium-density residential and commercial purposes. Following the adoption of these land development regulations, it will be too late to protect the wetlands as a system, which is how they function in providing drainage, habitat, and water filtration. Absent designation as a conservation area or open space, the wetlands can be preserved, at most, as isolated, poorly functioning remnants carved out of large-scale development plans. Wetlands are vital to the efforts of the City in the areas of drainage, flood control, and water quality. Two factors exacerbate the above- described inconsistencies in the Plan. First, the drainage system suffers from known deficiencies, and, at the same time, the City has failed to achieve certain significant objectives of its prior comprehensive plan with respect to drainage, flood control, and nonpoint sources of water pollution, such as stormwater runoff. Second, the data are inadequate concerning the City's drainage needs and capacity, as well as the precise role of the wetlands as to drainage and conservation. Although eliminating open space/wetlands as a land use category and declining to depict wetlands and floodplains as a natural resource, the City acknowledges several significant shortcomings in its drainage system and efforts to protect floodplains and wetlands. The City has failed to accomplish goals of earlier comprehensive plans to adopt a citywide Master Drainage Plan and obtain cost estimates for drainage improvements. It has even failed to adhere to statewide plans to control nonpoint sources of water pollution and prevent alteration of drainage patterns. A drainage improvement program, initiated between April and October, 1988, begins on an inauspicious note with the elimination of nearly all of the open space/wetlands from the Future Land Use Map. There are signs that the natural drainage system offered by local waterbodies and wetlands may be reaching or exceeding its capacity. There is clear evidence of at least isolated failures of vital parts of the natural drainage system. For example, Big Mud Lake has been exploited to its limit as a receptacle for untreated stormwater and is probably eutrophic. Suffering from untreated stormwater runoff, the Indian River has lost the vitality needed to maintain a harvestable shellfish population. The water quality of both of these waterbodies is not good. It is difficult to correlate Plan provisions protecting wetlands, ensuring adequate drainage, and preserving water quality with the nonrecognition of wetlands in the Future Land Use Map, especially in view of the City's admitted lack of knowledge concerning the needs and capacities of its drainage system. Besides repeated references in the Background Analysis to a lack of data concerning important aspects of the drainage system, the goals, objectives, and policies reflect the need for considerably more information in this area. For instance, Objectives 4.3.2 and 4.3.5 identify "needs assessments," "engineering studies," and "inspection programs" with respect to flooding and drainage that will be conducted in the future. Objective 4.3.7 ties in this work with the promise of the preparation of a surface water management plan, by October 1, 1995, to determine "existing deficiencies and needs," "cost and time requirements of corrective actions," and "sources of revenue." Policies 4.3.2.5, 4.3.5.2, 4.3.5.3, 4.3.7.1, and 4.3.7.2 also promise engineering studies to take place in the future in order to gather more information concerning drainage and the effect of stormwater on receiving waterbodies. The Background Analysis notes that no complete inventory of the drainage system has taken place for 20 years. The City requires these studies in order to determine what to do about a deficient drainage system for which no improvements are presently planned. Objective 4.3.7 acknowledges that the City has not included any improvements to its drainage or stormwater management systems for at least the initial five-year planning timeframe covered by the Plan. The Five Year Schedule of Improvements reflects no such expenditures, and the Background Analysis states that no such expenditures are planned for the next five years. As a result of the elimination of the open space/wetlands, many provisions concerning drainage and floodplain are no longer supported by the data and analysis in material respects. The data reveal the critical role of the wetlands and 100 year floodplain in the present performance of the drainage system. However, as noted above, the data also reveal that insufficient information is presently available upon which to justify the residential and commercial development of the wetlands, especially in the face of ongoing development in the 100 year floodplain. The broad promises of adequate drainage, floodplain protection, and maintenance or enhancement of the estuarine waters of the Indian River are inconsistent with the elimination of nearly all of the open space/wetlands from the Future Land Use Map and even the presence of significant development of wetlands and vacant floodplains. Under the circumstances, the Plan is internally inconsistent in its treatment of wetlands, drainage, and floodplains and, as a result of these inconsistencies, in its treatment of estuarine waters, the above-described habitats, and general water quality. The elimination from the Future Land Use Map of the open spaces hosting nearly all of the wetlands, coupled with the refusal to designate the wetlands and floodplains as natural resources on the map, are not merely inconsistent but mutually exclusive with Plan provisions protecting the above-named resources and ensuring adequate drainage. These Plan provisions lack support by the data and analysis contained in the Background Analysis. Under these conditions and in view of the failure of the City to allocate funds for improvements in the drainage system, including stormwater runoff, the Plan also lacks economic feasibility with respect to drainage and stormwater treatment. 2. Consistency with the Regional Plan Several "issues" identified in the plan of the Regional Planning Council are devoted to wetlands, drainage, and floodplains. Each of these issues contains a goal, background summary, and policies. Issue 38 of the regional plan deals with the protection of water resources. After acknowledging that stormwater runoff may be the largest surface water quality problem facing the region, Policies 38.3 and 38.5 urge local governments to divert the "first flush" of stormwater to retention facilities. The policies recommend that the local governments employ the most efficient and cost-effective pollutant control techniques available and wet detention facilities, including isolated wetlands. The goal of Issue 39 is to reduce dependence on structural means of floodplain management and optimize maintenance of water-dependent natural systems. The regional plan states that wetlands assimilate nutrients and trap sediment from stormwater, as well as physically retard the movement of surface water. Policy 39.7 advises that "[n]atural, isolated wetlands should be incorporated in surface water management systems as detention facilities, where . . . practical and appropriate, as an alternative to filling or excavating such wetlands." Policy 39.8 adds: "Floodplains which are relatively undisturbed should be protected and preserved " The goal of Issue 40 is the protection and preservation of the region's coastal areas. The regional plan defines the "coastal zone" as "within the watersheds of coastal estuaries," including the Indian River. The background summary recognizes the adverse effects of stormwater runoff on the Indian River, which is one of two major estuaries draining the region's coastal zone. These effects include the introduction of fresh water, which kills sensitive aquatic organisms like clams and oysters, and heavy metals and other pollutants. Policy 40.1 states in part: Proposed activities which would destroy or degrade the function of coastal wetlands . . . should not be permitted except where such activities are clearly in the public interest and there is no practical alternative which reduces or avoids impacts to wetlands. The redesignation of the four open spaces and the elimination of wetlands as a future land use is inconsistent with Policy 40.1. The use of the advisory word "should" in Policies 38.3, 38.5, 39.7, and 39.8 militates against a finding of inconsistency based upon a small number of specific provisions containing little more than recommendations. On balance, the Plan is not inconsistent with the policies of the regional plan. 3. Consistency with the State Plan Under the category of water resources, the state plan includes the following policies at Section 187.201(8)(b), Florida Statutes: 2. Identify and protect the functions of water recharge areas and provide incentive for their conservation. 4. Protect and use natural water systems in lieu of structural alternatives and restore modified systems. 8. Encourage the development of a strict floodplain management program by state and local governments designed to preserve hydrologically significant wetlands and other natural floodplain features. 10. Protect surface and groundwater quality and quantity in the state. 12. Eliminate the discharge of inadequately treated . . . stormwater runoff into the waters of the state. Under the category of natural systems and recreational lands, the state plan includes the following policies at Section 187.201(10)(b), Florida Statutes: Conserve . . . wetlands, fish, marine life, and wildlife to maintain their environmental, economic, aesthetic, and recreational values. 7. Protect and restore the ecological functions of wetlands systems to ensure their long-term environmental, economic, and recreational value. The above-cited policies are clear and specific. On balance, the Plan's treatment of wetlands, drainage, and floodplains, as well as estuarine waters, fisheries, wildlife, and vegetation habitats, and water quality, is inconsistent with the above-described policies of the state plan. On balance, the Plan is incompatible with and fails to further the state plan. The Plan is therefore inconsistent with the state plan. Historic Resources Internal Consistency The Plan is internally consistent with respect to historic resources. No material inconsistency exists with respect to the identification and protection afforded historic resources by the Plan. All relevant provisions of the Plan are oriented toward the protection of historic resources. Objective 3.1.4 promises the protection and preservation of historically significant housing. Policy 3.1.4.7 states that the City will identify historically significant housing and structures annually. Policy 1.5.3 provides that the City will protect historic resources by the education of the public, consideration of the establishment of an historic district, and purchase of development rights. Objective 1.5 states that in one year all development must be consistent with the Plan's objectives for the protection of historic resources. The above-described objectives and policies are supported by the data and analysis. As revised, the Background Analysis contains a map entitled the Cocoa historic district and an inventory of the 72 properties depicted on the map. Rule 9J-5.006(4)(a)10., Florida Administrative Code, requires the inclusion in the Future Land Use Map of historically significant properties meriting protection and the boundaries of any historic district. In the responses to the ORC, the City states that "no . . . historic resource land use categories are applicable for the city." There is some conflict between the acknowledgement of an historic district and claim that no historic resource land use categories are applicable for the city. However, on balance, the inconsistency is immaterial. Unlike the situation with respect to wetlands, drainage, and floodplains, the Plan provisions protecting historic resources can be carried out without the designation of an historic district on the Future Land Use Map. 2. Consistency with the Regional Plan Two "issues" of the plan of the Regional Planning Council are devoted to historic resources. Issue 61 concerns access to cultural and historical resources. Issue 62 concerns the development of cultural and historical programs. Policy 61.1 states that historical resources "shall" be properly identified and evaluated and "should" be protected and preserved. Policy 61.3 states that local governments should adhere to the requirements of the Act regarding the inclusion of known historically sensitive resources in existing and future land use maps and the treatment of historical resources in the coastal management element, where applicable. Policy 61.5 provides that the local government "shall," "to the maximum practical extent," avoid or reduce adverse impacts of adjacent land uses on historical sites listed or eligible for listing on the Florida Master Site File or National Register of Historic Places. Policy 62.5 states that historic resources listed or eligible for listing on the Florida Master Site File or National Register of Historic Places "shall be taken into consideration" in all capital improvement projects. The Plan could have gone farther to promote the preservation of historic resources, especially from the adverse impact of nearby development and redevelopment. The most obvious way in which to achieve this goal would be through the designation of an historic land use category. However, on balance, the Plan is not inconsistent with the policies of the regional plan. 3. Consistency with the State Plan Under the category of cultural and historical resources, the state plan includes the following policies under Section 187.201(19)(b), Florida Statutes: 3. Ensure the identification, evaluation, and protection of archaeological folk heritage and historic resources properties of the state's diverse ethnic population. Encourage the rehabilitation and sensitive, adaptive use of historic properties through technical assistance and economic incentive programs. Ensure that historic resources are taken into consideration in the planning of all capital programs and projects at all level of government and that such programs and projects are carried out in a manner which recognizes the preservation of historic resources. The Plan's treatment of historic resources is consistent with the above-described policies of the state plan. Redevelopment Plan The omission of the redevelopment plan earlier adopted by the City, the failure to describe in the Plan redevelopment programs, activities, and land development regulations, and the exclusion from the Coastal Management Element of a redevelopment component did not render the Plan inconsistent internally or with the regional or state plans.
Conclusions Jurisdiction 86 Standing 88 The Act 91 Public Participation 91 Elements Required of All Plans 94 General 94 Future Land Use Element and Map 96 Public Facilities Element 97 Conservation Element 99 Housing Element 100 Capital Improvements Element 100 Coastal Management Element 101 Miscellaneous Elements 104 Determination of Noncompliance 105 General 105 Wetlands, Drainage, and Floodplains 106 Historic Resources 108 Remedial Action 108 RECOMMENDATION 108
Recommendation Based on the foregoing, it is hereby recommended that the Department of Community Affairs determine that the Plan is not in compliance and, pursuant to Section 163.3184(9)(b), Florida Statutes, submit this Recommended Order to the Administration Commission for entry of an appropriate final order. RECOMMENDED in Tallahassee, Florida, this 2nd day of June, 1989. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 FILED with the Clerk of the Division of Administrative Hearings this 2nd day of June, 1989. APPENDIX TO RECOMMENDED ORDER, CASE NOS. 88-6338GM AND 89-0291GM Treatment Accorded the Proposed Findings of Petitioners Austin, Houston, and Dorn 1-16 Adopted. 17 Adopted in substance. However, Ms. Lawandales maintained in her office a color-coded map through much, if not all, of the planning process. 18-19 Rejected as subordinate. 20-21 Adopted. Rejected to the extent that the finding suggests that the Planning and Zoning Board did not intend that the City Council adopt the Plan. Although the Planning and Zoning Board did not formally recommend adoption by the City Council, the Board intended that the City Council adopt the Plan. Adopted. Rejected as recitation of testimony and subordinate. First four sentences adopted or adopted in substance. Remainder rejected as irrelevant. 26-27 Adopted in substance. 28-30 Rejected as subordinate. 31-33 Adopted in substance. Rejected as against the greater weight of the evidence. Adopted. Rejected as subordinate. Adopted in substance. 38-40 Rejected as irrelevant. 41 Rejected as subordinate. 42-43 Adopted. 44-46 Rejected as against the greater weight of the evidence. Adopted. Adopted in substance. 49-51 Rejected as irrelevant. 52 Rejected as against the greater weight of the evidence. 53-54 Rejected as recitation of testimony. 55 Adopted. 56-58 Rejected as irrelevant, except that the proposed finding that DCA found the Plan to be in compliance after using a balancing test is adopted in substance. Rejected as irrelevant. Rejected as against the greater weight of the evidence. 61-62 Adopted. Rejected as irrelevant. Adopted. 65-66 Rejected as irrelevant. 67-69 and 71 Rejected as legal argument. Rejected as against the greater weight of the evidence. Rejected as not finding of fact. 72-83 Rejected as irrelevant and against the greater weight of the evidence. 84-86 Rejected as irrelevant. Specific objectives and policies are insufficiently specific and, in certain respects, various Plan provisions represent nothing more than an intent to plan at a later date. However, such deficiencies must be evaluated in the context of all of the provisions of the entire Plan. After doing so, the only places at which the lack of specificity and deferral of planning are generate unlawful inconsistencies have been described in the recommended order. 87-91 Adopted or adopted in substance except that last sentence of Paragraph 91 is rejected as against the greater weight of the evidence. 92-93 Rejected as irrelevant. 94 Rejected as against the greater weight of the evidence. 95-98 Rejected as irrelevant. 99 and 111 Rejected as recitation of evidence. 100-110 and 112 Rejected as against the greater weight of evidence. 113 Rejected as not finding of fact as to the expertise of the witness. Rejected as against the greater weight of the evidence as to the inconsistency in the Plan's treatment of historic resources. Treatment Accorded Proposed Findings of Petitioners Hendry There are no rulings on the proposed findings of Petitioners Hendry due to the fact that it has been determined that they lack standing. Treatment Accorded Proposed Findings of DCA 1-4 Adopted. 5-18 Rejected as legal argument. 19-40 Adopted. 41 Rejected as irrelevant. 42-56 Adopted. 57 First sentence rejected as against the greater weight of the evidence. Second sentence adopted. 58-69 Adopted. 70 Adopted in substance. 71-72 Adopted. 73 First sentence adopted. Second sentence rejected as against the greater weight of the evidence. 74-75 Adopted in substance. Adopted. Rejected as legal argument. Treatment Accorded Proposed Findings of Cocoa I-IV Adopted or adopted in substance. Adopted except that Paragraphs B and C are rejected as legal argument. Adopted except that Paragraphs B.5, B.7, B.13, and B.14 are rejected as irrelevant and Paragraph B.8.f is rejected as against the greater weight of the evidence. Adopted in substance. Adopted or adopted in substance except that Paragraph G is rejected as against the greater weight of the evidence. COPIES FURNISHED: Judith E. Koons Attorney at Law Central Florida Legal Services, Inc. 1149 Lake Drive, Suite 201 Cocoa, FL 32922 David P. Hendry, pro se 17 Riverside Drive, #2 Cocoa, FL 32922 David J. Russ, Senior Attorney Rhoda P. Glasco, Senior Attorney Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Bradly Roger Bettin Amari, Theriac, Roberts & Runyons 96 Willard Street, Suite 302 Cocoa, FL 32922 Thomas G. Pelham Secretary Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Laurence Keesey General Counsel Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 ================================================================= AGENCY FINAL ORDERS ================================================================= STATE OF FLORIDA BEFORE THE ADMINISTRATION COMMISSION OMEGA AUSTIN, BEATRICE HOUSTON, and MARY DORN, Petitioners, vs. CASE NO. 89-31 DOAH CASE NO. 88-6338GM DEPARTMENT OF COMMUNITY AFFAIRS and CITY OF COCOA, Respondents. / DAVID P. HENDRY, SR. and LOULA P. HENDRY, Petitioners, vs. CASE NO. 89-31 DOAH CASE NO. 88-0291GM DEPARTMENT OF COMMUNITY AFFAIRS and CITY OF COCOA, Respondents. /
The Issue The issue is whether the Land Development Code (LDC) adopted by Ordinance No. 2007-12 on August 22, 2007, as amended on February 27, 2008, is inconsistent with the effective comprehensive plan for the City of Doral (City), which is the Miami-Dade Comprehensive Development Master Plan (County Plan).
Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: The Parties Section 64 is a Florida corporation. The Grand is a Florida limited partnership. Both entities are owned by the same individual. On September 25, 2001, Section 7 acquired ownership of an approximate ten-acre tract of property in the County (now the City) located along the southern boundary of Northwest 82nd Street, between 109th and 112th Avenues. See Petitioners' Exhibit 416. On December 16, 2005, title in one- half of the property was conveyed to The Grand in order to divide the property into two different ownerships. Id. It was Petitioners' intent at that time to build two hotels on separate five-acre tracts, one owned by Section 7 and the other by The Grand. The City is located in the northwestern part of Dade County and was incorporated as a municipality in June 2003. At the time of incorporation, the County's Plan and Land Use Code were the legally effective comprehensive plan and land development regulations (LDRs), respectively. On April 26, 2006, the City adopted its first comprehensive plan. After the Department determined that the Plan was not in compliance, remedial amendments were adopted on January 10, 2007, pursuant to a Stipulated Settlement Agreement. Although the Department found the Plan, as remediated, to be in compliance, it was challenged by a third party, and the litigation is still pending. See DOAH Case No. 06-2417. Therefore, the County Plan is still the legally effective Plan. See § 163.3167(4), Fla. Stat. The Department is the state land planning agency charged with the responsibility of reviewing LDRs whenever the appeal process described in Section 163.3213, Florida Statutes, is invoked by a substantially affected person. History of the Controversy When Petitioners' property was purchased in 2001, the County zoning on the property was Light Industrial (IU-1), having been rezoned by the County to that designation on October 9, 1984. See Petitioners' Exhibit 5. One of the uses permitted under an IU-1 zoning classification is a hotel with up to 75 units per acre. See Petitioners' Exhibit 6. The land use designation on the County's LUP map for the property is Low- Density Residential (LDR), with One Density Bonus, which allows 2.5 to 6 residential units per acre with the ability for a "bump-up" in density to 5 to 13 units per acre if the development includes specific urban design characteristics according to the County urban design guide book. Language found on pages I-62 and I-63 of the Future Land Use Element (FLUE) in effect at the time of the incorporation of the City (now found on pages I-73 and I-74 of the current version of the FLUE) provides in relevant part as follows: Uses and Zoning Not Specifically Depicted on the LUP Map. Within each map category numerous land uses, zoning classifications and housing types may occur. Many existing uses and zoning classifications are not specifically depicted on the Plan map. . . . All existing lawful uses and zoning are deemed to be consistent with the [Plan] unless such a use or zoning (a) is found through a subsequent planning study, as provided in Land Use Policy 4E, to be inconsistent with the criteria set forth below; and (b) the implementation of such a finding will not result in a temporary or permanent taking or in the abrogation of vested rights as determined by the Code of Metropolitan Dade County, Florida. As noted above, if there is a concern that zoning might be inconsistent with land use, using the criteria described in the provision, the County may initiate a planning study to analyze consistency and down-zone the property to a less intense use if an inconsistency is found. Although the County initiated a number of planning studies after it adopted its Plan in 1993, and ultimately down-zoned many properties, none was ever initiated by the County for Petitioners' property. Essentially, when existing uses and zoning are not depicted on the County LUP map, the language in the FLUE operates to deem lawfully existing zoning consistent with the land use designation on the property. In this case, the parties agree that the zoning of Petitioners' property is not depicted on the County LUP map. Therefore, absent a planning study indicating an inconsistency, the zoning is deemed to be consistent with the land use category. On August 22, 2007, the City adopted Ordinance No. 2007-12, which enacted a new LDC, effective September 1, 2007, to replace the then-controlling County Land Use Code. Although the LDC was adopted for the purpose of implementing the new City Plan, until the new Plan becomes effective, the LDC implements the County Plan. Amendments to the LDC were adopted by Ordinance No. 2008-1 on February 27, 2008. The LDC does not change the zoning on Petitioners' property. However, it contains a provision in Chapter 1, Section 5, known as the Zoning Compatibility Table (Table), which sets forth the new land use categories in the City Plan (which are generally similar but not identical to the County land use categories) and the zoning districts for each category. Pertinent to this dispute is an asterisk note to the Table which reads in relevant part as follows: Under no circumstances shall the density, intensity, or uses permitted be inconsistent with that allowed on the city's future land use plan. . . . Zoning districts that are inconsistent with the land use map and categories shall rezone prior to development. See Petitioners' Exhibit 27 at p. I-3. Under the Table, only residential zoning districts (with up to ten dwelling units per acre and no density bonus) are allowed in the City's proposed LDR land use category. Therefore, if or when the City Plan becomes effective, before Petitioners can develop their property, they must rezone it to a district that is consistent with the land use designation shown on the Table. There is no specific requirement in the LDC that the City conduct a planning study when it has a concern that the zoning is inconsistent with the relevant land use category in the new City Plan. Petitioners construed the asterisk note as being inconsistent with the text language on pages I-62 and I-63 of the County Plan. See Finding of Fact 5, supra. Accordingly, on August 21, 2008, Petitioners submitted a Petition to the City pursuant to Section 163.3213(3), Florida Statutes, alleging generally that they were substantially affected persons; that the LDC was inconsistent with the County Plan; that the LDC changes the regulations regarding character, density, and intensity of use permitted by the County Plan; and that the LDC was not compatible with the County Plan, as required by Florida Administrative Code Rule 9J-5.023.2 See Petitioners' Exhibit 103. The City issued its Response to the Petition on November 20, 2008. See Petitioners' Exhibit 104. The Response generally indicated that Petitioners did not have standing to challenge the LDC; that the Petition lacked the requisite factual specificity and reasons for the challenge; that the LDC did not change the character, density, or intensity of the permitted uses under the County Plan; and the allegation concerning compatibility lacked factual support or allegations to support that claim. On December 22, 2008, Petitioners filed a Petition with the Department pursuant to Section 163.3213(3), Florida Statutes, alleging that the LDC implements a City Plan not yet effective; that the LDC changes the uses, densities, and intensities permitted by the existing County Plan; and that the LDC changes the uses, densities, and intensities permitted by the not yet effective City Plan. See Petitioners' Exhibit 105. After conducting an informal hearing on April 7, 2009, as authorized by Section 163.3213(4), Florida Statutes, on July 23, 2009, the Department issued a Determination of Consistency of a Land Development Regulation (Determination). See Petitioners' Exhibit 102. See also Section 7 Tract 64 Property, Inc., et al. v. The City of Doral, Fla., Case No. DCA09-LDR-270, 2009 Fla. ENV LEXIS 119 (DCA July 23, 2009). In the Determination, the Department concluded that Petitioners were substantially affected persons and had standing to file their challenge; that the provision on pages I-62 and I-63 of the County FLUE did not apply to Petitioners' property because the uses and zoning of the property are specifically designated on the LUP map; that the law does not prohibit the Department from reviewing the LDC for consistency with the not yet effective City Plan; and that because the LDC will require Petitioners to rezone their property to be consistent with the City Plan, the challenge is actually a challenge to a rezoning action and not subject to review under this administrative process. See § 163.3213(2)(b), Fla. Stat. On August 13, 2009, Petitioners filed their Petition for Formal Proceedings with DOAH raising three broad grounds: that the LDC unlawfully implements a comprehensive plan not yet effective; that it changes the uses, densities, and intensities permitted by the County Plan and is therefore inconsistent with the County Plan; and that it changes the uses, densities, and intensities permitted by the not yet effective City Plan and is inconsistent with that Plan. See Petitioners' Exhibit 39. These issues are repeated in the parties' Stipulation. As to other issues raised by Petitioners, and evidence submitted on those matters over the objection of opposing counsel, they were tried without consent of the parties, and they are deemed to be beyond the scope of this appeal. The Objections Petitioners first contend that the LDC unlawfully implements a comprehensive plan not yet in effect, in that it was specifically intended to be compatible with, further the goals or policies of, and implement the policies and objectives of, the City Plan. See Fla. Admin. Code R. 9J-5.023. But Petitioners cited no statute or rule that prohibits a local government from adopting LDRs before a local plan is effective, or that implement another local government's plan (in this case the County Plan). While the LDC was adopted for the purpose of implementing a City Plan that the City believed would be in effect when the LDC was adopted, the City agrees that until the new City Plan becomes effective, the LDC implements the County Plan. Even though the two Plans are not identical, and may even be inconsistent with each other in certain respects, this does automatically create an inconsistency between the LDC and County Plan. Rather, it is necessary to determine consistency between those two documents, and not the City Plan. Except for testimony regarding one provision in the LDC and its alleged inconsistency with language in the County FLUE, no evidence was presented, nor was a ground raised, alleging that other inconsistencies exist. The Table note and the County Plan do not conflict. The LDC is not "inconsistent" merely because it was initially intended to implement a local plan that has not yet become effective. Petitioners next contend that the LDC changes the uses, densities, and intensities permitted by the County Plan and is therefore inconsistent with that Plan. Specifically, they contend that the note following the Zoning Compatibility Table in Chapter 1, Section 5 of the LDC is inconsistent with the language on pages I-62 and 63 (now renumbered as pages I-73 and I-74) of the County Plan. In other words, they assert that an inconsistency arises because the note requires them to down- zone their property before development, while the County Plan deems their zoning to be consistent with the County LUP map unless a special planning study is undertaken. The evidence establishes that if there is a conflict between zoning and land use on property within the City, it is necessary to defer to the language on pages I-62 and I-63 of the County FLUE for direction. This is because the County Plan is the effective plan for the City. Under that language, if no planning study has been conducted, the zoning would be deemed to be consistent with the land use. On the other hand, if a planning study is undertaken, and an inconsistency is found, the property can be rezoned in a manner that would make it consistent with the land use. Therefore, the LDC does not change the use, density, or intensity on Petitioners' property that is permitted under the County Plan. It is at least fairly debatable that there is no conflict between the Table note and the County Plan. Finally, Petitioners contend that the LDC changes the uses, densities, and intensities permitted by the not yet effective City Plan because the current industrial zoning designation will be inconsistent with the LDR land use designation. Petitioners argue that once the new City Plan becomes effective, the LDC requires them to down-zone their property before development. However, this concern will materialize only if or when the new City Plan, as now written, becomes effective; therefore, it is premature. Further, the definition of "land development regulation" specifically excludes "an action which results in zoning or rezoning of land." See § 163.3213(2)(b), Fla. Stat. Because the challenged regulation (the note to the Table) is "an action which results in zoning or rezoning of land," the issue cannot be raised in an administrative review of land development regulations. Id. The other contentions raised by Petitioner are either new issues that go beyond the scope of the Petition filed in this case or are without merit.
The Issue The issue in this case is whether Sumter County comprehensive plan amendment 94D1 adopted on September 20, 1994, by Ordinance No. 94-6 is in compliance.
Findings Of Fact Based upon all of the evidence, the following findings of fact have been determined: Background The parties Respondent, Sumter County (County), is a local government subject to the comprehensive land use planning requirements of Chapter 163, Florida Statutes. That chapter is administered and enforced by respondent, Department of Community Affairs (DCA). The DCA is charged with the responsibility of reviewing comprehensive land use plans and amendments made thereto. Petitioners, T. D. Farnsworth and James E. Boyd, own property and reside within the northern part of unincorporated Sumter County. Petitioner, Sumter Citizens Against Irresponsible Development (SCAID), is an organization founded by a small group of citizens for the purposes of preserving the "rural lifestyle" of the County, preventing urban sprawl, and ensuring "that development will not be a burden to the taxpayers" of the County. Farnsworth is president of the group while Boyd serves as its treasurer. By stipulation of the parties, petitioners are affected persons within the meaning of the law and have standing to bring this action. Intervenor, Villages of Lake Sumter, Inc. (Villages), is a Florida corporation and the owner and developer of the Tri-County Villages development of regional impact, which is the subject property of this proceeding. Villages submitted oral and written comments during the plan amendment review and adoption proceeding and thus has standing as an affected person to participate in this proceeding. Tri-County Villages To place this dispute in proper perspective, it is necessary to trace the history of the development which has occurred in and around the subject property. As noted earlier, intervenor is the owner and developer of the Tri- County Villages development located in unincorporated Sumter County. Development which predated the existing Tri-County Villages development commenced in approximately 1968 with Orange Blossom Garden North (OBGN). OBGN was an approximately 1,000-acre project owned and operated by Orange Blossom Hills, Inc. as a mobile home retirement community located mostly in the Town of Lady Lake, Florida. That community lies in the northwestern corner of Lake County, which adjoins the northeastern corner of Sumter County. Because the development of OBGN commenced prior to July of 1973, it is vested for purposes of development of regional impact (DRI) review pursuant to Section 380.06(20), Florida Statutes. In 1987, Orange Blossom Hills, Inc. submitted an Application for Development Approval (ADA) with the Town of Lady Lake which requested authorization to develop Orange Blossom Gardens South (OBGS). The OBGS development was an approximately 595-acre extension of the vested OBGN retirement community and was determined by the DCA and Town of Lady Lake to be a DRI. On January 18, 1988, the Town of Lady Lake approved the proposed OBGS development. In 1989, Orange Blossom Hills, Inc. submitted to the Town of Lady Lake and the County an ADA requesting a substantial deviation from the OBGS DRI. The substantial deviation request sought authorization to develop Orange Blossom Gardens West (OBGW). OBGW was planned as an approximately 1,700-acre extension to the OBGS DRI. The Town of Lady Lake approved the substantial deviation request through the issuance of an Amended Development Order on May 7, 1990. The County approved the development within its jurisdiction on May 29, 1990. In September 1993, intervenor, as successor to Orange Blossom Hills, Inc., submitted an ADA to the County which requested a substantial deviation from the OBGS and OBGW DRI's. By submitting this latest development, intervenor sought to add approximately 1,960 acres to the existing OBGS and OBGW DRI's and modify the development already approved by adding a total of 6,250 residential units and 910,000 square feet of commercial square footage. The overall development was renamed Tri-County Villages. The development order approving the substantial deviation for Tri-County Villages was adopted by the County on September 20, 1994. The Challenged Amendment On September 20, 1994, or prior to approval of the Tri-County Villages development substantial deviation, but in conjunction with it, the County adopted plan amendment 94D1 by Ordinance No. 94-6. On November 10, 1994, the DCA determined the amendment to be in compliance. That amendment amended the plan's Future Land Use Map (FLUM) to revise the land use designations on approximately 1,960 acres of land. Specifically, the plan amendment designated as Planned Unit Development (PUD) all areas of the approved OBGW DRI and the additional 1,960 acres referred to in Exhibit 1 of 94D1 as parcels 5 and 8. Prior to the amendment, parcels 5 and 8 had been designated predominantly as agricultural, with small pockets of rural residential. The plan amendment also revised the FLUM by extending the urban expansion area to include all of parcels 5 and 8. Prior to the amendment, only a small section of parcel 8 was included in the urban expansion area. The plan amendment further included several textual revisions to the Future Land Use Element (FLUE), including a revision to FLUE Policy 1.5.7 concerning the ratio of commercial square footage to residential units and the addition of FLUE Objective 1.14 and Policies 1.14.1 - 1.14.6, which essentially incorporated the concept of sector planning into the plan. Finally, the plan amendment revised Policy 2.1.5 of the Sanitary Sewer Element which, subject to submission of appropriate data and analysis, and Department of Environmental Protection approval, reduced the established level of service for sanitary sewer throughout the Tri-County Villages development. The Tri-County Villages DRI and ADA and plan amendment are related in that Section 380.06(6), Florida Statutes, requires that the local government's review of the DRI and corresponding comprehensive plan amendment be initiated and concluded at the same time. In the instant case, the Tri-County Villages ADA served as much of the background data and analysis for the plan amendment. The Tri-County Villages DRI also served as the sector plan for the area covered by the amendment. In addition to the voluminous data and analysis included in the Tri- County Villages ADA, the plan amendment also included detailed data and analysis. The data and analysis accompanying the amendment included a compatibility and land use suitability analysis, a soils analysis, an evaluation of urban sprawl related issues, an analysis of environmental considerations, a population and housing analysis, a concurrency analysis, and an analysis to ensure that the amendment was consistent with the adopted comprehensive plan. The data and analysis collectively demonstrated that the urban development proposed by the amendment was appropriate for the designated area. C. Is the Plan Amendment in Compliance? In their proposed recommended order, petitioners summarize their objections to the plan amendment as follows: (a) the amendment fails to protect agricultural lands, (b) the amendment encourages urban sprawl, (c) the future land use map is internally inconsistent, (d) there is no demonstrated need for 1,960 acres of PUD land use, (e) PUD is not a valid land use category, (f) the amendment does not ensure adequate fire and emergency medical services, (g) the County failed to coordinate with the local school board, (h) there is no reasonable protection from flooding, (i) the amendment does not provide adequate parks and recreational facilities, (j) affordable housing needs are not met, and there is no requirement that the developer install water and sewer facilities at its own expense. These contentions will be discussed separately below. Protection of agricultural lands Under the amendment, 1,960 acres of agricultural land will be converted to urban type uses. Petitioners contend that the amendment fails to protect agricultural land as required by FLUE objective 7.1.2 and Rule 9J- 5.006(5)(g)5., Florida Administrative Code. The cited objective "establishes agriculture as the primary use outside of the urban expansion area" and "insures retention of agricultural activities." If the plan amendment fails to "adequately protect adjacent agricultural areas," the cited rule considers this failure to be a prime indicator that the amendment does not discourage the proliferation of urban sprawl. The rule and objective do not prohibit the conversion of agricultural lands to urban uses. Indeed, FLUE objective 1.2 and the corresponding policies allow for the conversion of suitable agricultural lands as the need for additional urban land is demonstrated. The policies also require that the conversion be done in a well planned, orderly and logical fashion based on need and suitability. The agricultural lands being converted as a result of the plan amendment are appropriate for conversion. The plans, FLUE data and analysis demonstrate that one of the best areas for urban development in the County is the northeast portion of the County which covers the agricultural lands in the plan amendment. This determination was based on an extensive analysis of various factors including soil suitability, environmental constraints, and other planning criteria such as proximity to existing urbanized areas. The evidence establishes that the conversion of agricultural land contemplated by the plan amendment was justifiable because of the extent of urban development already existing in the area and the urban infrastructure currently in place. In addition, future populations will be directed away from the remaining agricultural lands throughout the County and to the development proposed by the plan amendment. The open space required by the PUD and Tri- County Villages amended development order sector plan will also serve to buffer and ensure compatibility of land covered by the plan amendment and the adjacent agricultural and rural lands. In view of the above, it is found that petitioners have not shown to the exclusion of fair debate that the plan amendment fails to protect agricultural land. Urban sprawl In the same vein, petitioners contend that the amendment fails to discourage urban sprawl because of the conversion of 1,960 acres of agricultural land to urban uses. In support of this contention, they cite a number of provisions within Chapter 9J-5, Florida Administrative Code, all dealing with urban sprawl, and which have allegedly been violated. They also point to the fact that large portions of the existing development have not been sold or built out, only 2 percent of the 1,960 acres will be devoted to commercial land use, the multiplier for the plan amendment is in excess of 1.25, which is an indicator of urban sprawl, and no future public facilities and services are planned for the lands covered by the amendment prior to its adoption. The plan amendment includes an evaluation of urban sprawl. That evaluation references FLUE policy 1.2.5.(a), which was adopted by the County specifically as a mechanism for discouraging urban sprawl. A review of that policy indicates that, for a PUD to be allowed in an agricultural area, it must score approximately 50 points based on factors including, but not limited to, proximity to the urban expansion area, proximity to urban services, including water, sewer, and roads, and proximity to other services such as fire protection and emergency medical services. If a proposed amendment or PUD failed to score 50 points, it was deemed to encourage urban sprawl and would not be approved by the County. The plan amendment scored 130 points, well in excess of the 50 point threshold. In addition to satisfying FLUE policy 1.2.5.(a), the plan amendment is consistent with FLUM maps VII-18A and VII-18C, which are the future land use constrained area overlay and urban sprawl evaluation overlay, respectively. As the FLUE data and analysis indicate, these maps were prepared for the purpose of directing urban development into areas most suitable for such development. Map VII-18A demonstrates that the land included in the plan amendment has only slight limitations for urban development. Similarly, Map VII-18C indicates that the land has only slight limitations in regard to urban sprawl. In fact, portions of land covered by the plan amendment are already within an established urban expansion area which is the OBGW DRI. Finally, the PUD mixed land use category and sector plan concept adopted by the plan amendment are planning methods specifically recognized and encouraged by prior DCA policy as reflected in the DCA's Technical Memo Special Edition 4-4 and the urban sprawl provisions incorporated into Rule 9J- 5.006(5)(l), Florida Administrative Code, effective May 18, 1994, as methods of discouraging urban sprawl. Indeed, the rule provides in part that mixed use development and sector planning . . . will be recognized as methods of discouraging urban sprawl and will be determined consistent with the provisions of the state comprehensive plan, regional policy plans, Chapter 163, Part II, and this chapter regarding discouraging the proliferation of urban sprawl. Given the above, it is found that petitioners have not shown to the exclusion of fair debate that the plan amendment encourages urban sprawl. The consistency of the future land Petitioners next argue in general terms that the FLUM does not "reflect policies which call for maintaining agricultural lands, discouraging urban sprawl, promoting land use compatibility, protection from flooding, providing for adequate public recreation facilities, and other objectives," and thus it is internally inconsistent. The FLUM series in the plan as well as the FLUM series as amended by the plan amendment is a pictorial representation of the goals, objectives, and policies of the comprehensive plan. In the absence of any credible evidence to the contrary, it is found that petitioners have failed to show to the exclusion of fair debate that the FLUM is internally inconsistent as alleged in their petition. Demonstrated need Petitioners next allege that the plan amendment "is premature in time and fails to provide demonstrated need" as required by various provisions within Chapter 9J-5, Florida Administrative Code. They further allege that the FLUM "is not based upon adequate surveys, studies, or data regarding the amount of land needed to accommodate anticipated growth." Initially, it is noted that the data and analysis in the plan are not subject to the compliance review process. Chapter 163, Florida Statutes, authorizes the DCA in a compliance review to determine only if the plan or plan amendment is based on appropriate data and analysis and whether the data was collected in a professionally acceptable manner. Planning methodologies used in analysis of the data, such as the calculation of a multiplier, must also be prepared in a professionally acceptable manner. In addition, the DCA may not choose one methodology over another. At hearing, petitioners raised issues concerning the methodology used in calculating the County's residential land use allocation multiplier and contended that other factors such as mortality rates and resale figures should have been used in calculating the multiplier. The preparation of the multiplier in issue came as a result of the DCA's Objections, Recommendations and Comments report. That report recommended that the County provide an analysis which demonstrated that the land use change requested in the plan amendment was based on the amount of additional land needed to accommodate the projected population during the planning time frame (the year 2014) established by the Tri-County Villages Amended Development Order sector plan. Based on historic data, the County calculated a multiplier which depicted the allocation of residential land countywide. The multiplier was 1.87, which means that the County allocated residential land uses approximately 87 percent above its demonstrated need for the planning period. The evidence shows that, in order to allow some degree of development flexibility, a local government will routinely allocate more land than is actually needed. Indeed, a multiplier of 1.87 is low when compared to the other multipliers found in compliance in adjacent local governments as well as in other local governments statewide. In actuality, a 1.87 multiplier is not really the most accurate depiction of the allocation of residential land county-wide because the population for OBGW and the other PUD in the County was not included in the calculation. In an effort to provide a more accurate multiplier, the County added to the equation the projected population for OBGW and the PUD. The resulting revised multiplier equalled 1.46. Petitioners developed a multiplier of their own of 1.88. However, they failed to show that the County's multiplier was not developed in a professionally acceptable manner. Moreover, petitioners' methodology was unacceptable because it did not project its population over the correct planning horizon. Petitioners failed to consider the 2014 planning horizon established by the Tri-County Villages Amended Development Order sector plan which controls the development of land covered by the plan amendment. Instead, petitioners multiplier incorrectly used the 2001 planning horizon established by the plan. In addressing the need for additional residential allocation, the amount of residential land allocated must be a reflection of the population expected through the end of the Tri-County Villages sector plan 2014 planning horizon. The type of development contemplated by the plan amendment and the additional population has not previously occurred in the County. Since development of OBGW commenced in 1992, the building permits issued in the County have increased by 94 percent. Much of this increase can be attributed to OBGW. The number of yearly certificates of occupancy for OBGW has stayed relatively constant and is expected to remain constant throughout the planning horizon. Intervenor's marketing scheme for OBGW seeks to attract retirees predominately from the northeastern part of the United States. The residents are not generally County residents prior to moving to Tri-County Villages. This same marketing scheme will be used for the future development of the Tri-County Villages. Thus, the future Tri-County Villages residents are not expected to be from the County. Tri-County Villages is a new type of development for the County. This new population was not taken into account in the original comprehensive plan which also had a low multiplier. Therefore, the need for residential allocation for this new population was not addressed. Because this new population is a reality which was not comtemplated by the plan, and the plan does not have an excess of allocated residential land, the need for the increased residential densities has been demonstrated. Petitioners have not shown to the exclusion of fair debate that the plan amendment was premature or not based on a demonstrated need. PUD as a land use category Because a planned unit development (PUD) is not "recognized" as a land use category in Rule 9J-5.006(1), Florida Administrative Code, petitioners contend that the use of that category in the plan amendment renders it not in compliance. For purposes of its compliance review, the DCA used the version of chapter 9J-5 which was in effect at the time of the submittal of the plan amendment. Then existing Rule 9J-5.006(1)(a), Florida Administrative Code, which was effective on March 23, 1994, established the generalized land uses which must be shown on the Existing Land Use Map (ELUM). Rule 9J-5.006(4)(a), Florida Administrative Code, requires that these same generalized land uses must be depicted on the FLUM as well. While it is true that PUD is not one of the generalized land uses listed in chapter 9J-5, the two rules cited above both allow a local government to depict other land use categories on the ELUM and FLUM. Because the plan references PUD as a mixed land use category, the County has properly depicted that category on both the ELUM and FLUM. Petitioners have failed to show that PUD as a mixed land use category is not recognized under the rules in existence when the plan amendment was reviewed. Compatibility with adjacent agricultural lands Petitioners have also alleged that the County has "not demonstrated compatibility with adjacent agricultural and rural residential land uses." They point to the fact that the area adjacent to and near the development is a "friendly rural community," and they allege that the development will harm this wholesome atmosphere. The plan allows for the well planned conversion of agricultural lands in the County. One of the requirements of the plan's PUD provisions is that PUD development be buffered from adjacent lands and contain open space. The purpose of this provision is to ensure compatibility. A review of the PUD application and DRI Master Development Plan, both incorporated into the plan amendment, shows that the Tri-County Villages development will provide approximately 1,100 acres of open space. Much of this open space will act as a buffer between the development and the adjacent agricultural and rural land uses. The project will also cluster its development which serves to separate the more urban development from the adjacent agricultural and rural uses. Another mechanism which ensures compatibility is the phased method of development proposed for the project. Under the phasing approach, only contiguous portions of the property will be developed at any given time during the planning period. In addition, existing agricultural uses on the property will continue until such time as the proposed development reaches that property. Given these considerations, it is found that petitioners have not shown to the exclusion of fair debate that the plan amendment is incompatible with adjacent land uses. Levels of service In their amended petition, petitioners assert that the plan amendment is in violation of FLUE objective 7.1.6 and FLUE policy 7.1.6.1, objective 1.1 and policy 1.1.1 of the Capital Improvements Element, Rules 9J-5.005(3), 9J- 5.011(2)2., 9J-5.015(3)(b)1., and 9J-5.016(3)(a) and (b)4., Florida Administrative Code, and Section 187.201(16)(b)6., Florida Statutes, all pertaining specifically or generally to levels of service for recreational facilities, schools, fire protection, emergency medical services and flooding. Policy 1.1.1 of the Capital Improvements Element adopts a recreational facility level of service for such facilities as softball fields, baseball fields, basketball courts, boat ramps and the like. The amount of facilities required is based on population. Under the plan, the County must take the necessary steps to insure that the availability of these facilities is addressed during the concurrency review process and not at the compliance review stage. In other words, when a proposed development reaches the stage of requesting a building permit, the County may require as a condition of the issuance of that building permit that a developer provide a certain facility. In this regard, it is noted that Chapter 163, Florida Statutes, requires that any development comply with concurrency requirements while the Tri-County DRI Amended Development Order requires that the developer provide for adequate public facilities. Both the plan amendment and the development authorized therein generally address the recreational level of service. However, if no additional facilities are constructed in the future, the plan amendment does not provide adequate baseball fields, softball fields, boat ramps or handball courts consistent with policy 1.1.1. In addressing these potential deficiencies, intervenor represented to the County that as a retirement community, the development would not generate a demand for these types of facilities. That is to say, the retiree population inhabiting the development would be less likely to participate in activities such as baseball or softball. The population would, however, generate a need for other recreational facilities such as golf courses, swimming pools, shuffleboard courts and bocci ball facilities, all of which the development has a surplus. In response to this concern, the County concluded that it was not appropriate to require the construction of certain facilities when the project would not generate a need for them. The County indicated that, during the plan evaluation and appraisal stage required in 1998, an amendment to the plan would be transmitted which would revise the plan to take into account such situations. If such an amendment is not adopted, intervenor will need to provide additional facilities necessary to meet concurrency requirements. There is no established level of service in the plan for fire protection or emergency medical services. Intervenor has, however, addressed these services in the Amended Development Order for the development. As reflected in that order, intervenor donated a five-acre parcel and constructed a fire station adjacent to the development. The station may also be used to house emergency medical services, if needed, although an existing emergency medical service provider is located in close proximity. Intervenor also donated to the County $80,000 for the purchase of fire fighting equipment, and each household pays the County a $30 annual fee for fire protection. Therefore, fire protection and emergency medical services have been addressed. The plan establishes no level of service standard for schools. Because the development is a retirement community, children under age 19 are prohibited. As a consequence, it was determined that impacts to school facilities would be minimal. Intervenor contacted and advised the school board of its retirement community development plans and projected student impacts. In response, the school board concluded that minimal impact was expected as a result of the development. To the extent that the development in the future allows school age children to reside therein, the Amended Development Order specifically calls for a substantial deviation determination pursuant to Section 380.06(19), Florida Statutes, to evaluate the potential impacts to school facilities. As a result of further review, intervenor may be required to provide additional school facilities. The plan establishes a level of service for stormwater drainage in terms of quantity and quality. Based on flooding which has occurred in the existing OBGW development, petitioners suggest that flooding will occur in the development proposed in conjunction with the plan amendment. While such flooding has occurred in the OBGW development, there is no evidence that the flooding was caused by a reduction or violation of the stormwater drainage level of service. Indeed, the evidence shows that the flooding was caused by an unusually heavy period of rainfall in combination with debris clogging the inlets of the stormwater system. The actual stormwater system for OBGW, which was reviewed and approved in the OBGW DRI review process, was designed for and required to meet the plan's drainage level of service. As a concurrency matter, any system designed for the future development contemplated in the plan amendment will also be required to meet the stormwater drainage level of service. Accordingly, it is found that petitioners have not shown to the exclusion of fair debate that the plan amendment violates the plan's level of services standard for stormwater drainage. Affordable housing Petitioners further allege that the plan amendment "fails to provide for affordable housing as required by Objective 3.5 of the Housing Element of the (plan)" in violation of various rules and the state comprehensive plan. The rule alleged to have been violated requires a local government to analyze the affordable housing stock within the local government. The local government must then adopt comprehensive plan goals, objectives, and policies which establish programs to ensure an adequate supply of affordable housing for the present and future residents. Housing Element objective 3.5 and the implementing policies which follow provide one of the mechanisms, coordination with the private sector, which the County uses to address the provision of affordable housing countywide. The provisions of objective 3.5 and the implementing policies place no specific requirements on the private sector. These plan provisions only require that, in addressing the provision of affordable housing, the County work with the private sector. Contrary to petitioners' assertion, neither the plan provisions nor chapter 9J-5 require the plan amendment to address the affordable housing deficiencies countywide. As a DRI requirement, however, the plan amendment does address the provision of affordable housing. A detailed housing analysis was provided in the Tri-County Villages ADA. The analysis included a review of the affordable housing stock pursuant to the East Central Florida Regional Planning Council's housing demand, supply and need methodology. The analysis further concluded that after phase 3, additional affordable housing may be necessary. To address this deficiency, the ADA for the development requires intervenor to reanalyze the available affordable housing consistent with objective 3.5 of the Housing Element. Thus, it is found that petitioners have not shown to the exclusion of fair debate that the plan amendment fails to provide affordable housing. i. Infrastructure funding Finally, petitioners allege that the plan amendment is inconsistent with FLUE policy 1.5.4. That policy provides as follows: All PUDS shall provide for central potable water and sanitary sewer facilities at the developer's expense and provide for fire hydrants and fire flow within the development in accordance with the National Fire Protection Association Standards. Intervenor has created community development districts as a mechanism to fund the development infrastructure. Intervenor is able to raise funds by the sale of bonds through these districts. The residents of the development will ultimately repay the bonds. Even so, petitioners allege that this funding mechanism is inconsistent with the cited policy because the infrastructure is not funded "at the developer's expense." The purpose and intent of the policy was to insure that the County not be obligated to fund infrastructure related to the PUD development. The developer, and ultimately the residents, of the project will fund the infrastructure through the community development districts. The County will not be obligated. This funding mechanism is consistent with policy 1.5.4. in that the County is not responsible for the funding of the PUD-related infrastructure. Accordingly, petitioners have not shown to the exclusion of fair debate that the plan amendment is inconsistent with the cited policy.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Community Affairs enter a final order determining that Sumter County's comprehensive plan amendment 94D1 is in compliance. DONE AND ENTERED this 11th day of July, 1995, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11 day of July, 1995. APPENDIX TO RECOMMENDED ORDER, CASE NO. 94-6974GM Petitioners: 1. Partially accepted in finding of fact 1. 2. Partially accepted in finding of fact 2. 3. Partially accepted in finding of fact 3. 4-5. Rejected as being unnecessary. 6. Partially accepted in finding of fact 40. 7. Partially accepted in finding of fact 34. 8-9. Rejected as being unnecessary. 10. Partially accepted in findings of fact 7-9. 11-14. Rejected as being unnecessary. Partially accepted in finding of fact 8. Partially accepted in finding of fact 7. Rejected as being unnecessary. Partially accepted in finding of fact 8. 19-21. Partially accepted in finding of fact 2. 22-23. Covered in procedural statement. 24-29. Partially accepted in findings of fact 16-20. 30-41. Partially accepted in findings of fact 21-25. 42. Rejected as being unnecessary. 43-77. Partially accepted in findings of fact 28-36. 78-85. Partially accepted in findings of fact 37-39. 86-95. Partially accepted in findings of fact 40-42. 96-148. Partially accepted in findings of fact 43-49. 149-162. Partially accepted in findings of fact 50-53. 163-166. Partially accepted in findings of fact 54-56. Respondents/Intervenor: With certain changes, the substance of proposed findings 1-53 has been generally incorporated into this recommended order. Note: Where a proposed finding has been partially accepted, the remainder has been rejected as being unnecessary for a resolution of the issues, irrelevant, not supported by the more credible, persuasive evidence, subordinate, or a conclusion of law. COPIES FURNISHED: Linda Loomis Shelley, Secretary Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Dan R. Stengle, Esquire General Counsel Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Mr. T. D. Farnsworth 12364 County Road 223 Oxford, Florida 34484 Felix M. Adams, Esquire 236 North Main Street Bushnell, Florida 33513-5928 David L. Jordan, Esquire Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Nancy G. Linnan, Esquire Post Office Drawer 190 Tallahassee, Florida 32302-0190 R. Dewey Burnsed, Esquire Post Office Box 491357 Leesburg, Florida 34749-1357
The Issue The general issue for determination in this case is whether Amendment 00-D1 to Sumter County’s comprehensive plan (the “Plan Amendment”) is "in compliance" with the Local Government Comprehensive Planning and Land Development Act, Sections 163.3161 through 163.3217, Florida Statutes. (All statutory references are to the 2000 codification of the Florida Statutes.) The initial Petition to Request Administrative Hearing (Petition) alleged numerous reasons why the Plan Amendment should be found not "in compliance." But from the time of the initial Petition--through the Joint Prehearing Stipulation, opening statement at final hearing, and Proposed Recommended Order (PRO)--Petitioners reduced the number of reasons why they contend that the Plan Amendment is not "in compliance" to the following: simultaneous conversion of Future Land Use (FLU) from Agricultural to PUD allegedly inconsistent with parts of the County's Plan's; alleged lack of demonstrated need for land use allocations contrary to Section 163.3177 and Florida Administrative Code Rules Chapter 9J-5 (all rule citations are to the Florida Administrative Code); conversion of FLU from Agricultural to PUD allegedly inconsistent with the Plan's Policy 4.6.1.1 (the so-called "90% rule"); and alleged failure to discourage urban sprawl contrary to Rule 9J-5.0006(6). These are the only compliance issues that still have to be addressed in this proceeding. In addition, Intervenor contends that Sumter Citizens Against Irresponsible Development (SCAID) does not have standing.
Findings Of Fact Intervenor, the Villages of Lake-Sumter, Inc., owns land in the northeast part of Sumter County on which Intervenor plans to construct a mixed-use development of regional impact (DRI) known as the Villages of Sumter. The proposed DRI will encompass approximately 4,679 acres and is anticipated to contain: 11,097 residential dwelling units; 1,250,000 square feet of commercial area; 250,000 square feet of office area; 157,000 square feet of institutional area; 120,000 square feet of hotel (300 rooms); 100,000 square feet convention center; 23,500 square feet of movie theater (8 screens); 512 acres of golf courses (126 holes); 8 marina slips; 602 acres of wildlife management and Kestrel foraging areas; 162 acres of lakes, 162 acres of roads, 31 acres of parks and buffers; and 227 acres of stormwater and open space. The proposed DRI will feature neighborhood and town centers and will extensively utilize clustering, open spaces, and buffering as part of its design. It is anticipated that the Villages of Sumter DRI will have an internal vehicle capture rate of over 60%--i.e., over 60% of vehicle trips starting in the DRI will not go outside the DRI. The DRI will provide water, sanitary sewer, stormwater management, aquifer recharge areas, and other governmental services as part of its development. Eighty percent of the residents in the Villages of Sumter DRI will have to be occupied by persons 55 of age or older, and no one under 19 will be permitted to reside within this DRI. When Intervenor filed its Application for Development Approval (ADA) for the Villages of Sumter DRI, Intervenor also requested the subject Plan Amendment to accommodate the DRI, including a change in the Future Land Use Element (FLUE) and FLUM from Agricultural use to UEA and PUD. The ADA itself served as a major part of the data and analysis supporting the Plan Amendment. (Another major part of the data and analysis was the Evaluation and Appraisal Report (EAR) prepared by the County in 1995.) The western part of the northern boundary of the Plan Amendment parcel (i.e., the Villages of Sumter DRI) will be the western part of the southern boundary of a related DRI developed by Intervenor known as the Tri-County Villages. From there, the Tri-County Villages DRI extends north to the southern border of Marion County and east to the western border of Lake County. (Towards the east, the northern boundary of the DRI drops just a little south of the southern border of Marion County.) Tri- County Villages is a large mixed-use DRI. It includes residential, commercial, recreational, and open space land uses. Prior to the Tri-County Villages DRI, Intervenor or its predecessor also developed other related mixed-use DRIs to the east in Lake County. SCAID was formed in 1993 or 1994 to oppose the Tri- County Villages DRI and 1994 comprehensive plan amendments adopted to accommodate the Tri-County Villages DRI. SCAID, T. Daniel Farnsworth, and James E. Boyd filed a petition initiating Sumter Citizens Against Irresponsible Development, T. D. Farnsworth, and James E. Boyd vs. Department of Community Affairs and Sumter County, DOAH Case No. 94-6974GM, to oppose DCA's determination that the County's 1994 amendments were "in compliance." SCAID, Farnsworth, and Weir are collaterally estopped to deny facts established in DOAH Case No. 94-6974GM (SCAID I). (Latham and Roop are not estopped.) See Conclusions of Law 63-64, infra. In any event, all Petitioners agreed to official recognition of the Final Order entered in DOAH Case No. 94-6974GM. Among the facts established by adoption of the Recommended Order by the Final Order in SCAID I was the history of the earlier DRIs, the Tri-County Villages DRI, and the comprehensive plan amendments required by the Tri-County Villages DRI: [¶4] [I]ntervenor [Villages] is the owner and developer of the Tri- County Villages development located in unincorporated Sumter County. Development which predated the existing Tri-County Villages development commenced in approximately 1968 with Orange Blossom Garden North (OBGN). OBGN was an approximately 1,000-acre project owned and operated by Orange Blossom Hills, Inc. as a mobile home retirement community located mostly in the Town of Lady Lake, Florida. That community lies in the northwestern corner of Lake County, which adjoins the northeastern corner of Sumter County. Because the development of OBGN commenced prior to July of 1973, it is vested for purposes of development of regional impact (DRI) review pursuant to Section 380.06(20), Florida Statutes. [¶5] In 1987, Orange Blossom Hills, Inc. submitted an Application for Development Approval (ADA) with the Town of Lady Lake which requested authorization to develop Orange Blossom Gardens South (OBGS). The OBGS development was an approximately 595-acre extension of the vested OBGN retirement community and was determined by the DCA and Town of Lady Lake to be a DRI. On January 18, 1988, the Town of Lady Lake approved the proposed OBGS development. [¶6] In 1989, Orange Blossom Hills, Inc. submitted to the Town of Lady Lake and the County an ADA requesting a substantial deviation from the OBGS DRI. The substantial deviation request sought authorization to develop Orange Blossom Gardens West (OBGW). OBGW was planned as an approximately 1,700-acre extension to the OBGS DRI. The Town of Lady Lake approved the substantial deviation request through the issuance of an Amended Development Order on May 7, 1990. The County approved the development within its jurisdiction on May 29, 1990. [¶7] In September 1993, intervenor, as successor to Orange Blossom Hills, Inc., submitted an ADA to the County which requested a substantial deviation from the OBGS and OBGW DRI's. By submitting this latest development, intervenor sought to add approximately 1,960 acres to the existing OBGS and OBGW DRI's and modify the development already approved by adding a total of 6,250 residential units and 910,000 square feet of commercial square footage. The overall development was renamed Tri-County Villages. The development order approving the substantial deviation for Tri-County Villages was adopted by the County on September 20, 1994. [¶8] On September 20, 1994, or prior to approval of the Tri-County Villages development substantial deviation, but in conjunction with it, the County adopted plan amendment 94D1 by Ordinance No. 94-6. On November 10, 1994, the DCA determined the amendment to be in compliance. That amendment amended the plan's Future Land Use Map (FLUM) to revise the land use designations on approximately 1,960 acres of land. Specifically, the plan amendment designated as Planned Unit Development (PUD) all areas of the approved OBGW DRI and the additional 1,960 acres referred to in Exhibit 1 of 94D1 as parcels 5 and 8. Prior to the amendment, parcels 5 and 8 had been designated predominantly as agricultural, with small pockets of rural residential. [¶9] The plan amendment also revised the FLUM by extending the urban expansion area to include all of parcels 5 and 8. Prior to the amendment, only a small section of parcel 8 was included in the urban expansion area. [¶10] The plan amendment further included several textual revisions to the Future Land Use Element (FLUE), including a revision to FLUE Policy 1.5.7 concerning the ratio of commercial square footage to residential units and the addition of FLUE Objective 1.14 and Policies 1.14.1 - 1.14.6, which essentially incorporated the concept of sector planning into the plan. [¶11] Finally, the plan amendment revised Policy 2.1.5 of the Sanitary Sewer Element which, subject to submission of appropriate data and analysis, and Department of Environmental Protection approval, reduced the established level of service for sanitary sewer throughout the Tri-County Villages development. SCAID I, 17 F.A.L.R. 4527, 4531-32 (Dept. Community Affairs Aug. 1995). (The Recommended Order may also be found on WESTLAW at 1995 WL 1052949.) At its inception, the Tri-County Villages DRI was projected to build-out in approximately 2015. When the Tri- County Villages DRI first began construction in late 1992, the developer pulled 24 building permits. In 1993, the County issued 406 residential building permits, 365 of which were pulled for the Tri-County Villages DRI. In 1997, the developer pulled 1,052 building permits for the Tri-County Villages DRI. To date, approximately 13,000 homes have been built in the Tri- County Villages DRI. Based upon present projections, the Tri- County Villages DRI is anticipated to be substantially built-out in 2003-04, 12 years ahead of its initially projected build-out date of 2015. Presently, there are numerous cultural and recreational activities, shopping options, medical and governmental services available to residents within the Tri-County Villages DRI. While still designated as a UEA and PUD on the County's FLUM, the Tri-County Villages DRI in fact is a self-contained urban area, especially in the context of Sumter County. Sumter County is mostly rural. According to the 1995 EAR, the County's permanent (non-seasonal) population was projected to be: 38,961 for 1998; 56,000 for 2005; and 64,200 for 2010. The unincorporated portion of the County contains 334,903 acres, approximately 99,436 acres of which are state- owned conservation lands, and approximately 202,000 acres of which are agricultural lands. There are five municipalities in the County--Wildwood, Bushnell (also the County seat), Center Hill, Coleman and Webster. None are as urbanized as the Tri- County Villages DRI. Simultaneous Conversion Objective 7.1.2 of the County's comprehensive plan provides in pertinent part: Upon adoption of this plan, Sumter County shall . . . provide for a compatible and coordinated land use pattern which establishes agriculture as the primary use outside of the urban expansion area boundary and insures retention of agricultural activities, preserves natural resources and discourages urban sprawl. In pertinent part, the County Plan's Policy 7.1.1.2(e) provides that the County's land development regulations governing PUDs should be based on and consistent with the following standards for densities and intensities: Within the Urban Expansion Area, a base density of up to 8 residential units per gross acre in residential areas and 6 units per gross acre in commercial areas are allowed. . . . . Outside of an Urban Expansion Area, a base density of up to 4 residential units per gross acre in residential, commercial and agricultural areas are allowed. Policy 7.1.5.1 allows PUDs "in the following land use districts and at the following densities/intensities of use": 8 dwellings per gross acre in "Residential Areas Inside UEA"; 6 dwellings per gross acre in "Commercial Areas Inside UEA"; and 4 dwellings per gross acre in "Res./Comm. Uses Outside UEA." Petitioners contend that the foregoing objective and policies somehow combine to preclude the simultaneous conversion of Agricultural FLU to UEA and PUD; they appear to contend that these policies necessitated an intermediate conversion to UEA. (Protection of agricultural lands was raised in a more general sense, but this precise issue was not raised prior to final hearing.) But Petitioners argument not only is not persuasive, it is not even easily understood. It is at least fairly debatable that the objective and policies do not combine to preclude simultaneous conversion of Agricultural FLU to UEA and PUD. Even without prior notice of this precise issue, one of the County's expert witnesses in land planning persuasively testified that the cited objective and policies do not combine to preclude simultaneous conversion of Agricultural FLU to UEA and PUD. Even Petitioners' expert land planner ultimately agreed that there is nothing in the Florida Statutes or Florida Administrative Code Rules Chapter 9J-5 to prevent conversion of agricultural uses to more urban uses. Demonstrated Need As reflected in previous Findings of Fact, the subject Plan Amendment is for a highly mixed-use PUD. Of the many mixed uses involved, Petitioners focus on the allocation of land for residential use in their challenge to the demonstration of need for the Plan Amendment. In this context, demonstrated need refers to the existence of adequate data and analysis to demonstrate the need for additional allocation of residential dwelling units on the FLUM. Petitioners assert that the methodology utilized by the County to project need is flawed. Determination of the need for a certain allocation of residential densities starts with a projection of population on the planning horizon (2020). In doing so, all available data and analysis must be considered. (Petitioners also assert that Policy 7.1.2.5(b)1. of the County's comprehensive plan requires such an analysis "utilizing professionally accepted methods," but that policy speaks to additional densities and allocations of land use for developments proposed in agricultural areas, while the Plan Amendment in this case converts the agricultural land to UEA and PUD.) For the purpose of analyzing whether there is a demonstrated need for this Plan Amendment, the County's planner, Roberta Rogers, relied upon need projections made in conjunction with the preparation of the County's EAR. The EAR, prepared in 1999, included a projection of the County's population for the 2020 planning horizon. The EAR projected that the permanent population of unincorporated Sumter County, by the year 2020, will be 79,475. (The total County permanent population is projected to be 94,205.) One of the purposes of an EAR is to provide data and analysis for comprehensive plan amendments. In preparing the population projections reflected in the EAR, Rogers began her analysis by referring to the projections for Sumter County formulated by the Bureau of Economic and Business Research ("BEBR"), as reported in 1996. The 1996 BEBR Report actually reflected projections made in 1995. BEBR publishes yearly reports that state both the estimated current and the projected future populations for each Florida county. The population projections reflected in BEBR Reports are based upon historical trends of 10-15 years' duration. Because the development in the Tri-County Villages DRI is a relatively recent phenomenon, Rogers believed that reliance upon the BEBR projections alone would have resulted in a significant under-projection of the County's future population. As a consequence, Rogers added an annual rate of growth of 1000 building permits per year through 2005 and 500 permits per year through the remaining portion of the planning period for the Tri-County Villages and the Villages of Sumter. Her approach was a conservative approach, since the actual number of building permits issued for the Tri-County Villages DRI in the past two years has significantly exceeded 1000 per year. Rogers conferred with BEBR, prior to completing her analysis, and was assured that her approach was appropriate. Such an adjustment for the Villages is particularly appropriate since the Villages cater to a very specific segment of the population, i.e., persons 55 and above. Over the twenty- year planning horizon relevant to the Plan Amendment, the population of persons in Florida aged 55 and above will increase dramatically as the "baby boomer" population ages. The demand for residential housing for these senior citizens will show a similar dramatic increase. Henry Iler, the Petitioners' land planning expert, took the contrary position, opining that no additional growth factor should be added to the 1996 BEBR projections. However, Dr. Henry Fishkind, an expert in demography who was involved in the original development of the BEBR population projection methodologies, directly contradicted Iler's opinion, concluding instead that Ms. Rogers' methodology was appropriate. As Dr. Fishkind stated that [Sumter] county has experienced a dramatic structural change to its population growth and development because of the Villages, and that has altered the characteristics of its population growth. In light of that, the use of past trends, which is what the bureau [BEBR] does, is simply extrapolate past trends, would not be appropriate, for it would not have taken into account that major structural change. Ms. Rogers identified the structural change, she measured its amount, and then she added on to the bureau's projections, which were extrapolations of the past trends. That's a very appropriate adjustment, and it's the kind of adjustment that econometricians and economists make on a regular basis. DCA's analysis concurred that the high absorption rates in the Tri-County Villages DRI had to be taken into account. To have ignored the explosion of growth in the Tri- County Villages DRI, particularly in view of the generally accepted expectation that the population to be served by the Tri-County Villages and by the Villages of Sumter will experience tremendous growth, would have resulted in an inaccurate population forecast. Even Iler had to concede that he was aware of building permit data being used to project population figures. It is simply not his preferred methodology to use such information. Thus, Rogers' projection of the County's total population for the year 2020 appropriately incorporated all available and relevant data and was formulated using an accepted methodology. While not part of their PRO, Petitioners previously attacked the County's population projections by questioning the continued success of the Villages to attract out-of-state retirees. Primarily through Weir's testimony, they attempted to raise the specter of a reduction of sales and Intervenor's subsequent financial ruin. But there was no credible evidence to support Petitioners' prophecy of doom. On the evidence presented in this case, it would be more rational from a planning standpoint to expect the Villages to continue to be a marketing and financial success. Having reasonably projected future population, it was then incumbent upon the County to determine how many dwelling units would be needed to accommodate anticipated housing needs. This determination was made by Gail Easley, an independent planner retained by the County to assist Rogers in preparation of the EAR. Easley performed this calculation for the County. Easley used 2.46 as the average number of persons per dwelling unit in the County, a figure taken from the BEBR reports (not from 1990 census information, as Iler incorrectly surmised.) There was no evidence that a number other than 2.46 was appropriate. It would not be appropriate for the number of dwelling units needed in the future to be calculated simply by the division of the anticipated population by the average household size. Rather, it is appropriate to apply a "market factor" (or multiplier) in order to ensure that there is a choice of types of housing and to accommodate lands that are not actually useable for residential construction. Even Petitioner's expert, Henry Iler, agreed that the use of a market factor was appropriate in order to ensure sufficient housing supply and to avoid an increase in housing prices. Easley furnished Rogers with the market factor for the EAR. The market factor chosen by Easley was 1.5, a factor she viewed as conservative and as appropriate for a jurisdiction that is beginning to urbanize. In more rural counties, a higher market factor, such as 2.0, should be used. While Iler implied that a lower marker factor would be more suitable, the record clearly established that the market factor used by Easley fell within the range of reasonable choices. (In SCAID I, the ALJ expressly found, in paragraph 31 of the Recommended Order, that the 1.87 market factor used by the County on that occasion was reasonable and actually low compared to factors used for other comprehensive plans that had been found to be "in compliance." As reflected by this Finding of Fact, facts and circumstances bearing on the choice of a market factor for Sumter County have not changed significantly to date. Cf. Conclusion of Law 64, infra.) Applying the 1.5 market factor to the projected population and average household size, the County determined that 62,274 dwelling units will have to be accommodated during the twenty-year planning horizon. (This includes 48,461 units in permanent housing, 9,113 in seasonal housing, and 4,700 in transient housing.) The County then allocated those dwelling units in various land use categories. Much of Petitioners' PRO on this point was devoted to criticizing parts of the evidence in support of the demonstration of need. They state the obvious that Easley did not perform a demonstration of needs analysis for the Plan Amendment in the EAR, but that was not the purpose of the EAR; nonetheless, the EAR contained valuable data and analysis for use in the demonstration of need analysis for the Plan Amendment. Petitioners also questioned DCA's reliance on the DRI ADA in conducting its demonstration of need analysis, based on the timing of the ADA and Plan Amendment submissions and decisions; but it is not clear what it was about the timing that supposedly detracted from DCA's demonstration of need analysis, and nothing about the timing made it inappropriate for DCA to rely on the data and analysis in the ADA. Petitioners criticized Rogers' reference to up-to-date building permit information that was not offered in evidence; but this information only further supported Rogers' demonstration of need analysis. Petitioners asserted that one of Intervenor's witnesses may have overstated residential sales in the Tri- County Villages DRI (1,750 sales a year versus evidence of 1,431 building permits for 1999); but the witness's statement was not used in any of the demonstration of need analyses. Finally, Petitioners attacked one of Intervenor's witnesses for an alleged "conflict of interest, a lack of professional integrity and an indication of bias"; but the basis for this allegation supposedly was evidence that the witness worked for the County while also working for Intervenor or its predecessor for a few years in the late 1980's, not enough to seriously undermine the credibility of the witness's testimony in this case (which in any event had little or nothing to do with the demonstration of need analyses.) It is at least fairly debatable that the County's demonstration of need was based on relevant and appropriate data, and professionally acceptable methodologies and analyses. Likewise, it at least fairly debatable that the County's projections regarding housing needs, the growth in the retirement population, and the absorption rates achieved in the existing Tri-County Villages DRI adequately support the allocation of 11,000 dwelling units permitted by the Plan Amendment. So-called "90% Rule" The County's Plan Policy 4.6.1.1 provides: The County shall maintain approximately 90% of its land area in land uses such as agricultural (including timberland, mining and vacant), conservation, and open (recreation, open space etc.) land uses for this planning period. (Emphasis added.) This policy is found in the Utilities Element of the County's comprehensive plan under a goal to protect and maintain the functions of the natural groundwater aquifer recharge areas in the County and under an objective to protect the quantity of aquifer recharge. Although couched as an approximation, the policy has been referred to as the "90% rule." Based on the evidence presented in this case, it is at least fairly debatable that the subject Plan Amendment is not inconsistent with Policy 4.6.1.1. The primary debate had to do with the proper treatment of certain "open space" provided in the Tri-County Villages DRI and the Villages of Sumter DRI-- 1,032 acres in the former and 2,135 acres in the latter. This "open space" consists of golf courses, preserves, wetlands, parks/buffers, and some stormwater/open spaces. Petitioners' expert refused to count any of this acreage for purposes of the so-called "90% rule" because, while the FLUE and FLUM have Agricultural, Conservation, and Recreation land use categories, there is no category designated "Open Space." (Meanwhile, there is an entire element of the plan entitled "Recreation and Open Space.") The witnesses for the County and DCA counted those 3,167 acres. They reasoned persuasively that the policy's express mention of "open space" (as opposed to a specific land use category designated "Open Space") supports their position. They also argued persuasively for the logic of including "open space," which serves the objective of the policy to "protect quantity aquifer recharge quantity," even if there is no specific land use category designated "Open Space." Counting the 3,167 acres of "open space" in the two DRIs, the percentage calculated under Policy 4.6.1.1 exceeds 90% for existing land uses. Omitting that land, as well as another 500 acres that should have been counted, Petitioners' expert calculated 88.96%. Petitioners' expert also calculated a lower percentage (85.34%) by using land uses he projected for the end of the planning period. However, Petitioners' expert conceded that it was not clear that Policy 4.6.1.1 should be interpreted in that manner. If so interpreted, it would be possible for all plan amendments reducing agricultural, conservation, and open FLUs to be prohibited even if existing land uses in those categories did not fall below "approximately 90%" for another 20 years. It is at least fairly debatable whether such a result is logical, or whether it is more logical to wait until existing land uses in those categories did not fall below "approximately 90%" before prohibiting further FLUE and FLUM amendments. Urban Sprawl Petitioners contend that the Plan Amendment fails to discourage urban sprawl. They attempted to prove seven urban sprawl indicators. But their evidence was far from sufficient to establish any beyond fair debate. Petitioners did not prove that the Plan Amendment promotes, allows or designates for development substantial areas of the jurisdiction to develop as low intensity, low density, or single-use development or uses in excess of demonstrated need. To the contrary, while gross residential density may be relatively low (2.4-2.6 units per gross acre), the Plan Amendment PUD provides for highly mixed-use development, not single-use development, and densities in residential areas within the PUD are significantly higher (up to 5.6 units per acre), especially for Sumter County. Petitioners also did not prove that the Plan Amendment promotes, allows or designates significant amounts of urban development to occur in rural areas at substantial distances from existing urban areas while leaping over undeveloped lands which are available and suitable for development, or that the Plan Amendment promotes, allows or designates urban development in radial, strip, isolated or ribbon patterns generally emanating from existing urban developments. To the contrary, the evidence was that part of the northern boundary of the Plan Amendment parcel coincides with the western part of the southern boundary of the Tri-County Villages DRI, and the Villages of Sumter PUD will be an extension of the Tri-County Villages DRI, which already has all the characteristics of an existing urban area. The reason why the eastern part of the northern boundary of the Plan Amendment parcel does not coincide with the southern boundary of the Tri-County Villages DRI is the existence of land in between which is already in use and not available to become part of the Plan Amendment PUD. Development will not be in a radial or ribbon pattern like (usually) commercial development along main roadways; nor will development be isolated. Petitioners did not prove that the Plan Amendment fails to protect adjacent agricultural areas and activities, including silviculture, and including active agricultural and silvicultural activities as well as passive agricultural activities, and dormant, unique and prime farmlands and soils. Obviously, conversion of agricultural land eliminates such land from agricultural use. But the Plan Amendment protects adjacent agricultural land by phasing development starting from existing urban areas in the Tri-County Villages DRI by mixing in open and recreational uses throughout the Villages of Sumter PUD and by providing some additional buffer between the periphery of the PUD and adjacent agricultural lands. Petitioners did not prove that the Plan Amendment fails to maximize the use of existing public facilities and services. Indeed, Petitioners' land use planning expert admitted at the hearing that he "didn’t have the time or expertise, really, to try to evaluate this particular question." To the contrary, the evidence was that the Plan Amendment PUD will include water, sanitary sewer, stormwater management, aquifer recharge areas, and other governmental services as part of its development. In addition, impact to schools will be minimal or non-existent due to the character of the PUD as a retirement community. Petitioners did not prove that the Plan Amendment fails to provide a clear separation between rural and urban uses. To the contrary, the evidence was that clustering, open spaces and buffering in the Villages of Sumter PUD will provide a clear enough separation between rural and urban uses. Petitioners did not prove that the Plan Amendment discourages or inhibits in-fill development or the redevelopment of existing neighborhoods and communities. Specifically, Petitioners argued that in-fill in the City of Wildwood will be discouraged. But the evidence was to the contrary. Not only would development of the kind envisioned in the Plan Amendment PUD be unlikely to occur in Wildwood, sufficient land is not available for such a development there. Actually, the Plan Amendment might encourage in-fill in Wildwood, where service providers for the Villages of Sumter might be expected to reside. SCAID SCAID was formed in 1993 or 1994 by a small group of Sumter County citizens for the purposes of preserving the "rural lifestyle" of Sumter County, preventing urban sprawl, and ensuring "that development will not be a burden to the taxpayers" of the County. SCAID has about 80 members, who are not required to pay dues. The majority of SCAID's members live in Sumter County, including all of the individual Petitioners in this case. SCAID is not incorporated but has by-laws drafted in 1995 or 1996. The by-laws provide for election of officers for one-year terms, but SCAID has not had an election of officers since 1994. Petitioner, T. Daniel Farnsworth, is and always has been SCAID's president. The evidence was that, when former SCAID member James Boyd resigned, Petitioner Linda Latham was appointed to replace him as secretary. SCAID has held just two meetings since its inception. Approximately 15-20 persons attended each meeting. Most communication with members is by regular and internet mail. Financial contributions are solicited from time to time for litigation efforts initiated by SCAID. Farnsworth, on behalf of SCAID, submitted comments on the Plan Amendment to the County between the transmittal hearing and the adoption hearing. Farnsworth and Weir also testified on behalf of Petitioners at final hearing. The other individual Petitioners did not.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that, under Section 163.3184(9)(b), the Department of Community Affairs enter a final order that Sumter County's Amendment 00-D1 is "in compliance." DONE AND ENTERED this 20th day of February, 2001, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 20th day of February, 2001. COPIES FURNISHED: Martha Harrell Chumbler, Esquire Nancy G. Linnan, Esquire Carlton, Fields, Ward, Emmanuel, Smith & Cutler, P.A. Post Office Box 190 Tallahassee, Florida 32302-0190 Jane M. Gordon, Esquire Jonas & LaSorte Mellon United National Bank Tower Palm Beach Lakes Boulevard, Suite 1000 West Palm Beach, Florida 33401-2204 Terry T. Neal, Esquire Post Office Box 490327 Leesburg, Florida 34749-0327 Colin M. Roopnarine, Esquire Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, Florida 32399-2100 Steven M. Seibert, Secretary Department of Community Affairs 2555 Shumard Oak Boulevard, Suite 100 Tallahassee, Florida 32399-2100 Cari L. Roth, General Council Department of Community Affairs 2555 Shumard Oak Boulevard Suite 325 Tallahassee, Florida 32399-2100
The Issue The issue is whether proposed rules 9J-5.026(3)(d), (7)(b), (7)(c)4. and 6., (8)(a), (9)(a)3., 6., 18., and 19., and 9J- 11.023(2), (4), and (5), and existing Florida Administrative Code Rule 9J-5.003(80) are invalid exercises of delegated legislative authority for the reasons alleged in the Petition for Administrative Hearing to Challenge Proposed Amendments to Chapters 9J-5 and 9J-11, F.A.C. and to Challenge Existing Rule 9J-5.003(80) (Petition).1
Findings Of Fact Based on the evidence presented by the parties, the following findings are made: The Parties Petitioners are not-for-profit organizations whose members own real property throughout the State. A substantial number of their respective members own real property which could be amassed as one or more areas in the RLSA program. Some members of these organizations have taken steps in an effort to have their land designated as an RLSA. On behalf of their respective members, each Petitioner has a substantial interest in public policy relating to land use planning, growth management, and the protection of agricultural, rural, and conservation lands. Respondent, Department of Community Affairs (Department), has stipulated to the facts necessary to establish standing for each Petitioner. The Department is the state agency charged with implementing the review provisions of the Local Government Planning and Land Development Regulation Act codified in Sections 163.3164, et seq., Florida Statutes. The Original Statute Creating the RLSA Program Because of the complexity of the subject matter, a recitation of the RLSA program's history is appropriate. In 2001, the Legislature enacted Chapter 2001-279, Laws of Florida, codified as Section 163.3177(11)(d), Florida Statutes, which created the RLSA pilot program. The law became effective on July 1, 2001, and stated: It is the intent of the Legislature that rural land stewardship areas be used to further the following broad principles of rural sustainability: restoration and maintenance of the economic value of rural land; control of urban sprawl; identification and protection of ecosystems, habitats, and natural resources; promotion of rural economic activity; maintenance of the viability of Florida's agriculture economy; and protection of the character of the rural areas of Florida. § 163.3177(11)(d)2., Fla. Stat. (2001). While the eligibility criteria and substantive requirements of the RLSA program have been amended several times, the foregoing principles have remained the same. The statute provides an option, not an exception, under the State's growth management laws for local governments to implement innovative planning and development strategies for large, rural parcels. While having many of the attributes of a traditional "transfer of development rights" program, the RLSA planning process provides additional planning and economic incentives as well as flexibility for the local government to implement this program. The program was best summarized by Secretary Pelham at hearing as follows: The RLSA process is an optional planning process which local governments may elect to use in rural and agricultural areas of the state. Essentially it provides incentives to landowners to preserve or conserve environmental and natural resources and agricultural lands by giving them stewardship credits that may be assigned to those lands to be preserved, but which can be used on other lands through a transfer of those credits to the receiving areas. Tr. at 182. The first step in the RLSA planning process is for the local government to "apply to the Department in writing requesting consideration for authorization to designate a [RLSA]." § 163.3177(11)(d)3., Fla. Stat. (2001). Under the original statute, if the Department chose to authorize a local government to designate an RLSA, it would do so by written agreement with the local government. See § 163.3177(11)(d)4. and (5), Fla. Stat. (2001). Because the original statute was a pilot program, the Department could authorize only five local governments to designate RLSAs. See § 163.3177(11)(d)6., Fla. Stat. (2001). To be eligible for designation as an RLSA under this pilot program, a parcel of land had to be larger than 50,000 acres but not over 250,000 acres; it had to be designated as rural or a substantial equivalent on the future land use map (FLUM); and it had to be located outside the municipal and established urban growth boundaries. See § 163.3177(11)(d)6., Fla. Stat. (2001). For this reason, only counties (and not cities) were eligible to participate in the program. Once it received Department authorization to designate an RLSA, the county was to then propose and adopt a plan amendment designating the RLSA. See § 163.3177(11)(d)6., Fla. Stat. (2001). This plan amendment was to be subject to full review under Section 163.3184, Florida Statutes, for a compliance determination. Also, the plan amendment was required to specifically address the following: Criteria for the designation of receiving areas within rural land stewardship areas in which innovative planning and development strategies may be applied. Criteria shall at a minimum provide for the following adequacy of suitable land to accommodate development so as to avoid conflict with environmentally sensitive areas, resources, and habitats; compatibility between and transition from higher density uses to lower intensity rural uses; the establishment of receiving area service boundaries which provide for a separation between receiving areas and other land uses within the rural land stewardship area through limitations on the extension of services; and connection of receiving areas with the rest of the rural land stewardship area using rural design and rural road corridors. Goals, objectives, and policies setting forth the innovative planning and development strategies to be applied within rural land stewardship areas pursuant to the provisions of this section. A process for the implementation of innovative planning and development strategies within the rural land stewardship area, including those described in this subsection and s. 9J-5.006(5)(l), Florida Administrative Code, which provide for a functional mix of land uses and which are applied through the adoption by the local government of zoning and land development regulations applicable to the rural land stewardship area. A process which encourages visioning pursuant to s. 163.3167(11) to ensure that innovative planning and development strategies comply with the provisions of this section. The control of sprawl through the use of innovative strategies and creative land use techniques consistent with the provisions of this subsection and rule 9J-5.006(5)(l), Florida Administrative Code. Once the plan amendment was in place, the county was then to implement it through land development regulations. Under the original statute, the county by ordinance was to "assign to the [RLSA] a certain number of credits, to be known as 'transferable rural land use credits' . . . ." These credits would then be transferred to designated receiving areas "solely for the purpose of implementing innovative planning and development strategies and creative land use planning techniques adopted by the local government pursuant to this section." See § 163.3177(11)(d)8.b., Fla. Stat. (2001). Once transferable rural land use credits were transferred from a parcel, the underlying land uses would be extinguished, the parcel would be limited to agriculture or conservation, and the transfer would be memorialized as a restrictive covenant running with the land. See § 163.3177(11)(d)8.k., Fla. Stat. (2001). The Department was granted the authority to implement this section by rule in the original statute. However, the Department did not adopt rules. No county applied to participate in this pilot program. Amendments to the RLSA Statute The Legislature substantially amended the statute in 2004. See Ch. 2004-372, Laws of Fla. Although the program had no participants as of that time, the Legislature removed the pilot status of the program and the limitation on the number of local governments that may be authorized to designate an RLSA. See § 163.3177(11)(d)1., Fla. Stat. (2004). Although the requirement for a written agreement between the county and the Department was deleted, the requirement for the county's application and Department's authorization prior to the designation of an RLSA remained. See § 163.3177(11)(d)1. and 4., Fla. Stat. (2004). The minimum acreage for an RLSA was reduced to 10,000 acres and the maximum was removed. § 163.3177(11)(d)4., Fla. Stat. (2004). The statute also explicitly recognized that RLSAs could be multi-county. § 163.3177(11)(d)2., Fla. Stat. (2004). In 2005, the Legislature again amended the statute in several respects, one of which was directed to the stewardship credit methodology. See Ch. 2005-290, Laws of Fla. However, the statute still requires that the total amount of credits is to be tied to the "25-year or greater projected population of the rural land stewardship area." Although the statute was amended again in 2006, those amendments have no bearing on the issues in this case. See Ch. 2006-220, Laws of Fla. Designating an RLSA Under the Statute Collier County has been frequently mentioned as a local government with an RLSA program. However, that County's comprehensive plan provisions regarding rural development were not adopted under the RLSA statute; rather, they were adopted by the County in 1999 as conventional plan amendments that were later approved in 2002 by a final order issued by the Administration Commission. Collier County's rural planning program does, however, have some of the same core attributes found in the RLSA program, including the creation of transferable land use credits to enable development in designated receiving areas. The Department closely examined the Collier County program as part of its "Rural Land Stewardship Area Program 2007 Annual Report to the Legislature" (2007 Annual Report). See Joint Exhibit 4. See also § 163.3177(11)(d)8., Fla. Stat. ("[t]he department shall report to the Legislature on an annual basis on the results of implementation of [RLSAs] authorized by the department"). This examination revealed several substantial flaws in the program. First, the Collier County program is extremely complex, with over twenty general attributes that must be examined for every acre of land assigned stewardship credits. This would make it difficult and expensive for small rural counties with limited resources. The Collier County program also assigns the highest stewardship credits to environmentally sensitive lands and appreciably lower values to agricultural land. The result is that development is directed to agricultural areas. For example, eighty-seven percent of the footprint of one receiving area that is currently being developed, known as Ave Maria, was in active agriculture prior to its designation for development. In this respect, the Collier County system is directing development to agricultural lands and not protecting and conserving those lands, which the Department contends contravenes the principles of rural sustainability. Another major concern with the Collier County program is the extent and distribution of receiving areas. The Collier County program does not have any requirements that the receiving area be clustered, thus allowing for the possibility of scattered, sprawling receiving areas throughout eastern Collier County. Also, there appears to be no limit on the footprint of these receiving areas. The original Collier County program envisioned development on only nine to ten percent of the entire area, for a total of approximately 16,800 acres. However, due to the complexity and "flexibility" within the Collier County stewardship credit system, "the maximum development footprint cannot be determined." On September 12, 2006, St. Lucie County adopted plan amendments under the RLSA statute. Later that year, the Department reviewed the amendments and found them to be in compliance. In preparing the 2007 Annual Report, the Department undertook a detailed analysis of the St. Lucie RLSA amendments. Even though the amendments had been previously found to be in compliance, the new analysis revealed several shortcomings in the amendments, including their failure to discuss, analyze, or demonstrate how they further the principles of rural sustainability, a primary focus of the program. Also, the amendments were not supported by an analysis of land use need. Instead of projecting population and need, the RLSA adopted an arbitrary cap of 13,248 dwelling units with "no known planning basis." The St. Lucie RLSA is similar to the Collier County program in two respects: it is very complex, and it places no spacial limits on the footprint of the development area. Due to these shortcomings, the Department has placed little, if any, reliance on the St. Lucie County RLSA amendments as an example of proper planning under the RLSA statute. There is no evidence that any development has occurred under the St. Lucie program, and its most recent Evaluation and Appraisal Report dated October 2008 indicated that none may ever occur. In 2007, Highlands and Osceola Counties both applied for and were granted authorization by the Department to designate RLSAs. However, both counties later notified the Department that they would no longer pursue the RLSAs, and the authorizations were withdrawn by the Department. The Rule Development Process In early 2007, the Department became aware of assertions by some landowners that the RLSA program provides for unlimited development within a stewardship area; that RLSA plan amendments were not subject to the growth management provisions in Chapter 163, Florida Statutes; and that RLSAs were not subject to a needs analysis, as required by the law. At the same time, the Department received numerous inquiries from large landowners and/or their representatives regarding RLSA proposals, some as large as 750,000 acres, and for two "new towns" with 100,000 and 60,000 dwelling units, respectively. It also became aware of concerns and criticisms leveled against the one adopted RLSA program in St. Lucie County and rural planning efforts in Collier County. The main criticism was that the system being used for RLSA planning was too complex, which resulted in an expensive, consultant- intensive process that lacked transparency and was largely incomprehensible. Based on the above concerns and criticisms, the Department began gathering information in early 2007 in preparation for rulemaking. On July 19, 2007, it conducted its first workshop. Two other workshops were held, and the first draft of proposed rule 9J-5.026 was issued in January 2008. That proposed rule set forth the minimum substantive requirements for RLSA planning. In September 2008, the Department issued its first draft of proposed rule 9J-11.023, which sets forth the procedural requirements for a local government to seek authorization from the Department to designate an RLSA. After receiving comments from interested parties, the Department noticed the rules for adoption and conducted a rule adoption hearing. On January 7, 2009, Petitioners filed a Petition challenging most of the provisions in the proposed rules. See DOAH Case No. 09-0048RP. Based upon that challenge, which raised new issues not previously brought to the attention of the Department, the Department withdrew the rules and made substantial revisions to address these concerns. This rendered moot Petitioners' earlier challenge. After the revised rules were noticed for adoption, Petitioners filed their Petition challenging numerous provisions within the proposed rules as well as one existing rule. The Objections As summarized in their Proposed Final Order, Petitioners contend (a) that proposed rules 9J-11.023(2), (4), and (5) are invalid because they exceed the Department's grant of rulemaking authority;4 (b) that proposed rules 9J-5.026(7)(b), (7)(c)4., 6., (8)(a), and (9)(a)3., 6., 18., and 19. enlarge, modify, or contravene the specific provisions of law implemented; (c) that proposed rule 9J-5.026(3) is vague and fails to establish adequate standards for agency decisions; (d) that proposed rule 9J-5.026(9)(a)18. is arbitrary; and (e) that existing Rule 9J-5.003(80) contravenes the specific provisions of law implemented. The remaining allegations have been voluntarily dismissed. a. Does proposed rule 9J-11.023 exceed the grant of legislative authority? Petitioners first contend that subsections (2) and (4) in their entirety and the words "If authorized to proceed" in the first sentence of subsection (5) of proposed rule 9J-11.023 are an invalid exercise of delegated legislative authority because they exceed the Department's specific grant of legislative authority. The challenged subsections of the proposed rule read as follows: 9J-11.023 Procedure for the Designation of a Rural Land Stewardship Area. * * * (2) Pre-Notification Actions. Prior to giving official notification of intent to designate a RLSA to the Department, the county(ies) shall conduct at least one noticed public workshop to discuss and evaluate the appropriateness of establishing a RLSA. The county(ies) shall invite the Department of Community Affairs, Department of Agricultural and Consumer Affairs, Department of Environmental Protection, Department of Transportation, Florida Fish and Wildlife Conservation Commission, affected regional planning council(s), and affected water management district(s) (collectively referred to as the "RLSA Interagency Technical Advisory Team") to participate in the workshop. Potentially affected landowners and other interested parties shall be given notice and invited to participate in the workshop. The workshop shall address: the statutory process for designating a RLSA; the planning issues that are likely to arise; and the technical assistance that will be available from state and regional agencies if the county(ies) proceed to designate a RLSA. The county(ies) shall provide opportunities for broad public participation in the RLSA process, which may include a series of public meetings or workshops. The county(ies), in coordination with the affected landowners, shall host a site visit of the RLSA for the RLSA Interagency Technical Advisory Team in conjunction with the workshop or after the notification of intent to designate pursuant to paragraph (4)(b). * * * Review of Notification of Intent to Designate. The Department will provide members of the RLSA Interagency Technical Advisory Team with a copy of the notification of intent to designate within five days after receipt of the notification. If a site visit was not made prior to the notification of intent to designate, the Department will contact the county(ies) within ten days after receipt of the notification of intent to arrange a site visit of the proposed RLSA and surrounding lands. The county(ies) shall ensure proper coordination with the affected landowners. The Department will coordinate the scheduling of the site visit with the members of the RLSA Interagency Technical Advisory Team and request their participation in the site visit. Members of the RLSA Interagency Technical Advisory Team shall be asked to provide the Department oral and/or written comments on the proposed RLSA within 30 days of the receipt of the notification of intent to designate or the site visit, if it occurs after the notification. The Department may also request meetings with the members of the RLSA Interagency Technical Advisory Team to discuss and evaluate the notification and site visit. The Department may also request a conference with the county's(ies') staff(s) to discuss issues and questions that have arisen as a result of the site visit, comments from members of the Interagency Technical Advisory Team and other stakeholders, and the Department's evaluation of the RLSA proposal. Not later than 60 days following the receipt of the notification of intent to designate or the site visit, whichever is later, the Department shall issue a written notification to the county(ies). The Department's notification shall authorize the county(ies) to proceed with a plan amendment to designate the RLSA or inform the county(ies) of the Department's decision not to authorize. The decision shall be based on the information contained in or gained from the notification, site visit, other agency comments, and other information received. The Department shall authorize the county(ies) to proceed if it determines that the proposed RLSA meets the threshold eligibility requirements of subsection 9J-5.026(4), F.A.C. and that there is a reasonable likelihood that the RLSA will further the principles of rural sustainability. If the Department decides to authorize the county(ies) to proceed with a plan amendment to designate a RLSA, the notification will set forth the facts on which the authorization is based, and may include recommendations to the county(ies) regarding the RLSA. The notification will not guarantee that a comprehensive plan amendment(s) to designate a RLSA will be found in compliance by the Department. It will only constitute the Department's authorization to designate a RLSA if the necessary comprehensive plan amendment(s) are adopted and found in compliance pursuant to Section 163.3184, F.S. If the Department decides not to authorize the county(ies) to proceed with a plan amendment to designate a RLSA, the agency's notification will explain the reasons for the decision. Amendment to the Comprehensive Plan: If authorized to proceed, the county(ies) may prepare and process a plan amendment(s) that will be reviewed by the Department pursuant to Section 163.3184, F.S. The county(ies) may, in preparing the plan amendment(s), establish a local visioning process to facilitate the development of a RLSA plan amendment. The Department encourages the county(ies) to seek and utilize technical assistance from the members of the RLSA Interagency Technical Advisory Team in preparing a RLSA plan amendment. 33. Sections 120.52(8)(b) and 120.54(3)(a)1., Florida Statutes, require that the agency list in the rulemaking notice the purported rulemaking authority for the proposed rule. To comply with this requirement, the Department's rulemaking notice cites Sections 163.3177(9) and (11)(h), Florida Statutes, as the specific authority for adopting the rule and Section 163.3177(11)(d)1., Florida Statutes, as the law being implemented. In its Proposed Final Order, the Department relies on Section 163.3177(11)(h) as the specific statutory authority for rulemaking. It provides that the Department "may adopt rules necessary to implement the provisions of [subsection 163.3177(11)]," including the RLSA provisions found in Section 163.3177(11)(d). On the other hand, the law being implemented is quite lengthy and reads as follows: (11)(d)1. The department, in cooperation with the Department of Agriculture and Consumer Services, the Department of Environmental Protection, water management districts, and regional planning councils, shall provide assistance to local governments in the implementation of this paragraph and rule 9J-5.006(5)(l), Florida Administrative Code. Implementation of those provisions shall include a process by which the department may authorize local governments to designate all or portions of lands classified in the future land use element as predominately agriculture, rural, open, open-rural, or a substantively equivalent land use, as a rural land stewardship area within which planning and economic incentives are applied to encourage the implementation of innovative and flexible planning techniques, including those contained herein and in rule 9J- 5.006(5)(l), Florida Administrative Code. Assistance may include, but is not limited to: Assistance from the Department of Environmental Protection and water management districts in creating the geographic information systems land cover database and aerial photogrammetry needed to prepare for a [RLSA]; Support for local government implementation of rural land stewardship concepts by providing information and assistance to local governments regarding land acquisition and assistance to local governments regarding land acquisition programs that may be used by the local government programs that may be used by the local government or landowners to leverage the protection of greater acreage and maximize the effectiveness of rural land stewardship areas; and Expansion of the role of the Department of Community Affairs as a resource agency to facilitate establishment of [RLSAs] in smaller rural counties that do not have the staff or planning budgets to create a [RLSA]. Proposed rule 9J-11.023 describes in detail the process by which a local government is to request Department authorization to designate a RLSA. At issue here are provisions in subsections (2), (4), and (5) of the rule that require a local government wishing to designate an RLSA to conduct a public workshop; cover particular topics during the workshop; host a site visit with designated agencies; and based on the information gathered from this process to then allow the Department, in its discretion, to either authorize or not authorize the local government to begin to prepare and process an RLSA amendment. The latter decision is based on whether the local government has shown "a reasonable likelihood that the RLSA will further the principles of rural sustainability." Petitioners contend that there is no specific grant of rulemaking authority that authorizes the Department to mandate these procedures in the rule or to prevent a local government from proposing and processing an RLSA plan amendment. Instead, they contend that the enabling statute only allows the Department to promulgate rules that are "necessary" to implement the RLSA program, those being a requirement that the county provide notice to the Department that it intends to propose a RLSA plan amendment and a description of the subsequent review process by the Department to determine whether the amendment is in compliance. Section 163.3177(11)(d)1., Florida Statutes, authorizes the Department to provide "assistance to local governments in the implementation of this paragraph and rule 9J- 5.006(5)(l)." (The cited rule, among other things, encourages "innovative and flexible planning and development strategies" that allow conversion of rural and agricultural lands to other uses.) The statute also includes specific authority to establish a "process by which the department may authorize local governments to designate all or portions of lands classified in the future land use element (FLUE] as predominately agricultural, rural, open, open-rural, or a substantively equivalent land use, as a [RLSA] . . . ." The rule accomplishes this purpose by requiring state agency technical assistance, establishing the process for a workshop and site visit, requiring that the county's notification describe the basis for the designation, requiring broad public participation, and assuring, by approval or disapproval of the county's preliminary proposal, that the proposed RLSA will promote the principles of rural sustainability. Notably, had the Legislature intended this authorization process to be the same as the existing compliance review process for conventional plan amendments, there would be no need for this statutory language. The proposed rule does not exceed the Department's grant of rulemaking authority. b. Do certain provisions within proposed rule 9J-5.026(7) and (9) enlarge, modify, or contravene the law implemented? Petitioners further contend that proposed rules 9J- 5.026(7)(b), (7)(c)4., 6., (8)(a), and (9)(a)3., 6., 18., and enlarge, modify, or contravene the specific provisions of law implemented. The challenged rules read as follows: 9J-5.026 Rural Land Stewardship Area (RLSA) * * * Data and Analysis Requirements. * * * Population Projections and Analysis of Land Use Need. Population projections and analysis of land use need shall be prepared in accordance with Rule 9J-5.006, F.A.C., with the following modifications: The amount and extent of allowable development in the RLSA must be based on the 25-year or greater projected population of the RLSA; the anticipated effect of the proposed RLSA must receiving areas, including any committed catalyst projects, infrastructure improvements, or other projects that would attract and support development; the furtherance of the statutory principles of rural sustainability; and the goals, objectives, and policies of the RLSA plan amendment. * * * 4. Land development and other conversion threats whereby rural resources under threat require more incentives via stewardship credits and less threatened resources require lesser incentives. This includes the future threat of low-density sprawl on lands within and surrounding Eligible Receiving Areas; and * * * 6. Values shall be assigned to all of the land in the RLSA. The highest values shall be assigned to the most environmentally valuable land, and to open space and agricultural land where the retention of such lands is a priority. The assignment of values shall be submitted with the RLSA plan amendment as part of the supporting data and analysis. * * * Stewardship Credit System Criteria. (a) Each credit shall represent a defined number of residential units or a defined amount of non-residential square footage. The credit transferee may decide whether to use the credit for a residential or non- residential use in accordance with the land use standards established for the Designated Receiving Area. * * * Goals, Objectives, Policies, and Map. * * * (a) The goals, objectives, and policies shall include the following: * * * 3. Identification of the innovative planning and development strategies to be used within the RLSA, and a process for implementing the strategies, including the adoption of implementing plan amendments, land development regulations, and the issuance of development orders. The process shall include provision for the Department's review of a proposed land development regulation to designate a receiving area for consistency with the RLSA plan amendment. * * * 6. A requirement that Eligible Receiving Areas shall be located on land that is suitable for development and have the lowest land values based on the land values analysis conducted pursuant to paragraph (7)(c). * * * Policies for new towns which comply with the following: As required by subsection 9J-5.003(80) and paragraph 9J-5.006(5)(1), F.A.C., a new town shall be designated on the future land use map. A new town shall be located within a Designated Receiving Area. The plan amendment designating a new town shall include a master development plan that establishes the size of the new town, the amount, location, type, density and intensity of development, and the design standards to be utilized in the new town. Any increase in the density or intensity of land use required to achieve the proposed new town may occur only through the use of stewardship credits assigned or transferred to the Designated Receiving Area either prior to or subsequent to the designation of the new town on the future land use map. New towns shall be surrounded by greenbelts, except for any connecting rural road corridors and to the extent that new towns are adjacent to existing or planned urban development or incorporated areas. A future land use map amendment to designate a new town shall be internally consistent with RLSA provisions of the comprehensive plan. A future land use map amendment to designate a new town shall be accompanied by an amendment to the capital improvements element to incorporate a financially feasible five-year capital improvements schedule for the public facilities necessary to serve the new town and an amendment to the transportation or traffic circulation element to designate any new rural road corridors required to connect the new town with the rest of the RLSA. Provisions to ensure that any use of the underlying densities and intensities of land uses assigned to parcels of land by the county comprehensive plan prior to designation of the RLSA furthers the principles of rural sustainability. * * * The grant of authority for this rule is cited as Sections 163.3177(9) and (11)(h), Florida Statutes, while Sections 163.3177(2), (3), (6)(a), (8), (10)(e), (11)(a), (b), and (d)1., 2., 4., 5., and 6., Florida Statutes, are cited as the laws being implemented. Subsection (2) of the law being implemented provides that "[c]oordination of the several elements of the local comprehensive plan shall be a major objective of the planning process"; subsection (3) is a lengthy provision requiring that a comprehensive plan include a capital improvements element; paragraph (6)(a) describes in detail the matters that must be contained in the FLUE; subsection (8) requires that all elements of the comprehensive plan be based on data appropriate to the element involved; paragraph (10)(e) generally provides that support data and analysis shall not be subject to the compliance review process, but they must be based on appropriate data; paragraph (11)(a) describes the Legislature's recognition of using innovative planning and development strategies; paragraph (11)(b) expresses the intent of the Legislature to allow the conversion of rural lands to other uses, where appropriate, including urban villages, new towns, satellite communities, area-based allocations, clustering, and open space provisions, mixed-use development, and sector planning; and subparagraphs (11)(d)1., 2., 4., 5., and 6. describe the statutory process for creating an RLSA. Subsection (7) of the proposed rule sets forth the data and analysis requirements that apply to all RLSA plan amendments, including data and analysis of existing conditions (subparagraphs (7)(a)1. through 10.); population projections and analysis of land use (paragraph (7)(b)); and a land values analysis (subparagraphs (7)(c)1. through 6.). A land use needs analysis is an integral part of the planning process. Paragraph (7)(b) requires that an RLSA amendment be supported by population projections and an analysis of land use need such that the amount and extent of allowable development must be based on the 25-year or greater projected population of the RLSA, other items, and the anticipated effect of proposed RLSA receiving areas. Petitioners contend that this language contravenes Section 163.3177(11)(d)6., Florida Statutes, amended in 2005, which provides in part that the total amount of development "must enable the realization of the long- term vision and goals for the 25-year or greater projected population of the [RLSA], which may take into consideration the anticipated effect of the proposed receiving areas." See Ch. 2005-290, Laws of Fla. Paragraph (7)(b) does not contravene the terms of the statute. As expressed in the law being implemented, the rule directs that the need analysis shall be based upon, among other things, "the anticipated effect of the proposed RLSA receiving areas " As a part of the data and analysis to be supplied, paragraph (7)(c) requires that an RLSA amendment be supported by a land values analysis that considers six components described in subparagraphs 1. through 6. This in turn requires a comprehensive analysis of rural resources that exist within the RLSA. Subparagraph 4. requires that the analysis include the development threats to rural resources and that resources under threat of conversion receive more incentives from stewardship credits than resources under less of a threat. Petitioners contend that the rule contravenes Section 163.3177(11)(d)6.j., Florida Statutes, because it requires a greater value to be assigned to resources under threat of conversion and would result in other rural and natural and agricultural resources which may have a higher intrinsic value being assigned fewer credits. Specifically, the cited statute requires that "the highest number of credits per acre" should be "assigned to the most environmentally valuable land, or, in locations where the retention of open space and agricultural land is a priority, to such lands." The purpose of the rule is straightforward: to protect those resources that are under the greatest threat and those that are most susceptible to harm over time through land development or other changes, including urban sprawl. Contrary to Petitioners' assertion, the overall analysis does in fact consider all forms of rural resources in determining how the credits will be assigned. The rule implements the statutory directive of attaining the principles of rural sustainability. Subparagraph (7)(c)6. requires, among other things, that the local government submit as a part of the data and analysis supporting the plan amendment "the assignment of values" of all lands in the RLSA. Petitioners contend that assigning values at the time of the amendment "locks in these values" and would require a subsequent plan amendment in contravention of Section 163.3177(11)(d)6., Florida Statutes, which Petitioners argue contemplates the creation of credits after the adoption of the plan amendment. At hearing, however, the Department explained that because conditions will obviously change over time, the land values analysis will be periodically updated and can be changed without a new plan amendment. In their Proposed Final Order, Petitioners concede that given this interpretation of the rule, it "would not be an invalid exercise of delegated legislative authority." See Petitioners' Proposed Final Order, par. 73. Paragraph (8)(a) of the proposed rule requires each stewardship credit to represent either a defined number of residential units or non-residential square footage. Once the credits are created in sending areas, they can be transferred to designated receiving areas to be used to enable development that is consistent with the RLSA goals, objectives, and policies. Petitioners contend that the rule will prohibit mixed-use development in contravention of Section 163.3177(11)(d)4.c., Florida Statutes, which requires that the RLSA goals, policies, and objective provide for a "functional mix of land uses." There is no prohibition of a mix of land uses. In fact, the opposite is true. As clarified by a Department witness, "a mix is essentially required, as you can see from [sub]paragraph (9)(a)17., which describes that a mix of use must be addressed." Tr. at 273. The rule does not contravene the statute. Subsection (9) of the proposed rule generally requires that the RLSA plan amendment contain goals, objectives, policies, and a map. Subparagraphs (9)(a)1. through 21. require that the goals, objectives, and policies identify the innovative planning and development strategies to be used in the RLSA process, including the adoption of implementing plan amendments, land development regulations, and the issuance of development orders. Petitioners allege that subparagraphs 3., 6., 18., and enlarge, modify, or contravene the law implemented. Subparagraph 3. requires "implementing plan amendments" because the Department recognized the fact that the RLSA planning process will consume years or even decades and will require implementing plan amendments to accomplish its purpose. This is especially true here as the RLSA process involves the development of large tracts of land (as much as 100,000 acres or more) that will take years or decades to fully implement and build out. At a minimum, under current law, the "implementing plan amendments" will include a capital improvements element annual update; water supply planning, and the designation of new towns. Except for the requirement that an implementing plan amendment designate a new town pursuant to existing Rule 9J-5.003(80), Petitioners agree that the proposed rule is valid. Because the cited existing rule has been determined to be valid, Petitioners' contention is rejected. See Findings 62-65, infra. Subparagraph 6. provides that the goals, policies, and objectives shall contain "a requirement that the Eligible Receiving Areas shall be located on land that is suitable for development and have the lowest land values on the land values analysis conducted pursuant to paragraph (7)(c)." Petitioners contend that this provision limits the flexibility of local governments to determine the best location for Eligible Receiving Areas and therefore contravenes the provisions in various parts of Section 163.3177, Florida Statutes, that emphasize flexibility. The rule implements the principles of rural sustainability contained in Section 163.3177(11)(d)2., Florida Statutes. Only by directing development to land with the lowest environmental, agricultural, and rural resource value will an RLSA protect ecosystems, habitat, natural resources, and the agricultural economy. The rule does not contravene this statute. Subparagraph 18. requires an RLSA plan amendment to include policies for "new towns," including a requirement that a new town be designated on the FLUM. Petitioners contend that the requirement to designate a new town on the FLUM contravenes Section 163.3177(11)(4)(d)4., Florida Statutes, which provides for the implementation of the innovative planning and development strategies included in existing Rule 9J-5.006(5)(l) through zoning and land development regulations. At hearing, Petitioners narrowed their argument to this one feature in the rule. Because the Department may lawfully require that new towns be designated on the FLUM, subparagraph 18. is consistent with the statute implemented. See Findings 62-65, infra. Subparagraph 19. requires that RLSA plan amendments contain goals, objectives, and policies "to ensure that any use of the underlying densities and intensities of land uses assigned to parcels of land by the county comprehensive plan prior to designation of the RLSA furthers the principles of rural sustainability." Petitioners contend this provision contravenes Section 163.3177(11)(d)6., Florida Statutes, because it "impinges on existing land use rights which is contrary to one of the statutory principles of rural sustainability, namely the 'restoration and maintenance of the economic value associated with rural lands.'" The rule, however, furthers the principles of rural sustainability, as required by Section 163.3177(11)(d)1., Florida Statutes, since it requires that all lands within an RLSA, whether or not in a Designated Receiving Area, be developed in a manner that furthers those principles. It does not contravene the cited statute. Petitioners also contend that subparagraph 19. contravenes Section 163.3161(9), Florida Statutes, which requires, among other things, that all programs be applied "with sensitivity for private property rights and not be unduly restrictive." Petitioners surmise that the rule may operate to displace underlying density within the RSLA regardless of the use of the RLSA credit system. However, the rule does not displace any underlying density; it only requires that underlying rights be exercised consistent with the RLSA. More specifically, existing densities may be used in any manner that furthers the principles without displacing any of those densities. The rule does not contravene either statute. Is proposed rule 9J-5.026(3) vague and does it have inadequate standards for agency decisions? Petitioners next contend that subsection (3) of proposed rule 9J-5.026, and specifically certain words within the definition of the term "greenbelt," are vague and fail to establish adequate standards for agency decisions. That provision reads as follows: 9J-5.026 Rural Land Stewardship Area (RSLA) * * * (3) Definitions * * * (d) "Greenbelt" means a border of permanently undeveloped land sufficient in size to effectively preclude the expansion of urban development into the surrounding rural lands and to provide an effective buffer to protect the surrounding rural resources from development impacts. A greenbelt is an undeveloped area that surrounds an urban area, a new town, or other urban development and is meant to separate the urban developed area from the surrounding area to provide a border that protects surrounding rural lands from urban development. Petitioners contend that the use of the adjectives "sufficient," "effectively," and "effective" to describe the greenbelt buffer are vague and lack standards to guide agency determinations. In common usage, the word "sufficient" means that the greenbelt is sufficient in size to accomplish its purpose of precluding the expansion of urban development into the surrounding rural lands. Similarly, the word "effectively" means that the use or creation of a buffer to protect urban encroachment on rural lands will be accomplished in an effective manner. Likewise, the word "effective" simply means that the greenbelt achieves the purpose of creating a buffer. These phrases are easily understood by persons of ordinary intelligence, particularly when read in context with other provisions of the rule. See, e.g., Cole Vision Corp., et al. v. Dept. of Bus. and Prof. Reg., 688 So. 2d 404, 410 (Fla. 1st DCA 1997). Petitioners contend, however, that the rule fails to explicitly include the standard that site-specific data would be considered in determining the "sufficiency" of a buffer. However, this level of detail is not needed since site-specific information is typically considered and applied by the local government and Department through the planning process and might include, for example, the nature of the urban area, the potential impacts if the urban area is extended, the nature of the surrounding land, and other similar factors. The rule is not so vague or lacks sufficient standards as to be invalid. Is proposed rule 9J-5.026(9)(a)18. arbitrary? Petitioners further contend that subparagraph (9)(a)18. of proposed rule 9J-5.026 is arbitrary. That rule reads as follows: 18. Policies for new towns which comply with the following: As required by subsection 9J-5.003(80) and paragraph 9J-5.006(5)(1), F.A.C., a new town shall be designated on the future land use map. A new town shall be located within a Designated Receiving Area. The plan amendment designating a new town shall include a master development plan that establishes the size of the new town, the amount, location, type, density and intensity of development, and the design standards to be utilized in the new town. Any increase in the density or intensity of land use required to achieve the proposed new town may occur only through the use of stewardship credits assigned or transferred to the Designated Receiving Area either prior to or subsequent to the designation of the new town on the future land use map. New towns shall be surrounded by greenbelts, except for any connecting rural road corridors and to the extent that new towns are adjacent to existing or planned urban development or incorporated areas. A future land use map amendment to designate a new town shall be internally consistent with RLSA provisions of the comprehensive plan. A future land use map amendment to designate a new town shall be accompanied by an amendment to the capital improvements element to incorporate a financially feasible five-year capital improvements schedule for the public facilities necessary to serve the new town and an amendment to the transportation or traffic circulation element to designate any new rural road corridors required to connect the new town with the rest of the RSLA. As noted earlier, this rule sets forth the requirements for policies in the RLSA plan amendment that are applicable to new towns. Petitioners contend that the rule is arbitrary because it "selectively emphasizes" a new town as only one of several innovative and flexible planning strategies set forth in existing Rule 9J-5.006(5)(l). To be arbitrary, a rule must not be supported by logic or the necessary facts. See § 120.52(8)(e), Fla. Stat. Here, the more persuasive evidence shows that new towns are much larger development types; they are more intense than other development forms; and they will likely generate greater impacts. In an RLSA, they take on even more significance since the planning goal is to further the principles of rural sustainability. Collectively, these factors form a sufficient basis and rationale for giving new towns different treatment than other development forms that are smaller, have fewer uses, are less intense, and are more likely to have lesser impacts. The proposed rule is not arbitrary. e. Does existing Rule 9J-5.003(80) contravene the specific provisions of law implemented? Finally, Petitioners have challenged existing Rule 9J- 5.003(80), which became effective in 1994, on the ground that it contravenes the specific provisions of law implemented. That rule defines the term "new town" as follows: (80) "New town" means a new urban activity center designated on the future land use map and located within a rural area, distinct and geographically separated from existing urban areas and other new towns. A new town is of sufficient size, population and land use composition to support a variety of economic and social activities consistent with an urban area designation. New towns include basic economic activities; all major land use categories; and a centrally provided full range of public facilities and services. New towns are based on a master development plan. The specific authority for the rule, when adopted, was Section 163.3177(9) and (10), while the law being implemented was identified as Sections 163.3177 and 163.3178, Florida Statutes. Because Section 163.3178 involves coastal management, and a new town would probably not be located in a coastal zone, it has marginal relevance to this proceeding. The Department relies principally on Section 163.3177(6)(a), Florida Statutes, which requires, among other things, that "various categories of land use shall be shown on a land use map or map series."6 The existing definition provides, in part, that a new town will include "all major land use categories, with the possible exception of agricultural and industrial." Because they include numerous land use categories, new towns are by definition a mixed-use land use category. See Fla. Admin. Code 9J-5.006(4)(c). Mixed-use land use categories must be designated on the FLUM. See § 163.3177(6)(a), Fla. Stat.("The future land use plan may designate areas for future planned development use involving combinations of types of uses"). As noted above, a new town is recognized in existing Rule 9J-5.006(5)(l) as an innovative and flexible planning option. Because the Legislature referenced this rule provision with approval four times in the RLSA statute, it must be presumed that the Legislature was expressing approval of the existing definition with the mapping requirement. See §§ 163.3177(11)(d)1. (two separate references); 163.3177(11)(d)4.c.; and 163.3177(11)(d)4.e. The rule does not contravene the statute being implemented.
Findings Of Fact Based upon the record evidence, the following Findings of Fact are made: The Town of Jupiter and Its Neighbors The Town of Jupiter (Town, Jupiter) is an incorporated municipality located in northeastern Palm Beach County between Interstate 95 (I-95) and the Atlantic Ocean. The Village of Tequesta, the Town of Juno Beach and Jupiter Inlet Colony are adjoining municipalities. Jupiter is also bordered by unincorporated areas of Palm Beach County. The focal point of urban activity in Palm Beach County (County) is the City of West Palm Beach. The dominant community in the County north of West Palm Beach is the City of Palm Beach Gardens, which is south of Jupiter. There is a regional mall, as well as a satellite County Courthouse, in Palm Beach Gardens, both of which are situated on PGA Boulevard. Jupiter is the major center of urban activity north of Palm Beach Gardens. Its market area is sub-regional in scope. Growth in Jupiter: A Brief History The Jupiter of today is much different than the Jupiter of only a few decades ago. In 1960, the Town's population was just 1,058. By 1970, it had increased to 3,136. During the 1970's, the Town more than tripled its population to slightly less than 10,000, but it still was a bedroom community without any significant employment opportunities. This began to change during the next decade. Small businesses, in increasing numbers, started to locate in the Town. They were followed by larger employers. The 1980's saw not only a substantial increase in employment opportunities, but a substantial increase in population as well. The Town now has a population of approximately 28,000 and is becoming a fairly self- sufficient community offering a wide variety services to its residents. There is one existing new car dealership (Dodge) in Jupiter. Two additional new car dealerships (Ford and Cadillac) have been approved and permitted. 2/ Additionally, there are a number of new car dealerships clustered together on Northlake Boulevard in the City of Palm Beach Gardens 3/ less than ten miles from Jupiter to which the Town's residents have access. 4/ There remain only a few tracts of vacant, uncommitted land within the jurisdictional boundaries of the Town. The unincorporated areas surrounding the Town, however, are largely undeveloped. A considerable amount of the growth in Jupiter since the late 1980's can be attributed to the completion of the "missing link" of I-95, a north-south roadway that is the main intra-urban route in South Florida. Until late 1987, I-95 went as far north in Palm Beach County as PGA Boulevard. In late 1987, a new stretch of I-95, from PGA Boulevard to Fort Pierce, including an interchange at Indiantown Road in Jupiter, was opened to the travelling public. The opening of the I-95 interchange at Indiantown Road has enhanced the Town's market potential and contributed significantly to the Town's integration into the broader metropolitan area of greater Palm Beach County. Jupiter does not have a traditional downtown area. Growth has generally occurred along the Town's major roadways, including Indiantown Road, a state roadway which offers the only direct access from I-95 to the Town and therefore serves as the primary gateway to the Town. In recent years, nearly 60 percent of office and other commercial projects in the Town have been located on that segment of Indiantown Road from I-95 to the roadway's eastern terminus at A1A near the coast, a distance of approximately five and a half miles. The initial impact of the fast-paced development on Indiantown Road was to increase traffic congestion and generate complaints that the roadway was becoming a visual eyesore with its "strip commercial" development. At the time, although it was the Town's primary commercial corridor, Indiantown Road had only two lanes, one going east and the other going west. It is now in the process of being widened and transformed into a six-lane, median divided, controlled access roadway. The Planning Process and the Indiantown Road Corridor Study In the fall of 1986, the Town began the laborious process that culminated in the adoption of its Comprehensive Plan more than three years later. During the planning process, the members of the Town Council, Jupiter's governing body, having heard the complaints of residents regarding the negative impact of development on Indiantown Road and the inadequacy of the Town's existing land development regulations to deal with the situation, determined that a study should be undertaken to develop a comprehensive strategy to address these problems. Of particular concern to the Council members were issues relating to traffic and aesthetics. In November, 1988, the Council retained Henry Skokowski, a planning consultant, to conduct such a study. Skokowski was specifically directed by the Council to, among other things, examine the various types of commercial land uses and determine those that should be permitted and those that should be prohibited in the Indiantown Road corridor. Skokowski's initial draft of the results of his study was submitted to the Council in February, 1989. The Town's proposed Comprehensive Plan was transmitted to the Department of Community Affairs for its review and comments in April, 1989. The Council accepted Skokowski's final draft of the results of his study in the latter part of 1989. The final draft was virtually identical in substance to Skokowski's initial offering. In both, he recommended, among other things, that certain commercial land uses, including "auto . . . sales," that he reasonably felt did not mesh with the desired overall character of the corridor, be absolutely prohibited, without exception, throughout the length of the corridor. 5/ This recommendation, from the outset, was the subject of considerable public debate and discussion before the Town Council. Skokowski endorsed a nodular pattern of development for the corridor. Under his plan, the corridor would contain six urban subdistricts, each having as their focal point a major intersection, with the remaining portions of the corridor consisting of parkway subdistricts with suburban characteristics reflecting a less intensive commercial development pattern than found in the urban subdistricts. From west to east, the six urban subdistricts, which constituted nodes of development, were the Central Boulevard District, the Center Street Landmark District, the Maplewood Drive District, the Civic District, 6/ the Alternate A1A District and the US 1 District. Through the creation of a special overlay zone for the corridor and the adoption of regulations restricting the permitted uses of land 7/ and establishing design, landscaping, and signage requirements on a subdistrict by subdistrict basis, Skokowski envisioned that each subdistrict would develop an identity that was not only distinctive and unique, but compatible with, and reflective of, community values unlike the strip commercial development that then existed in the corridor. Throughout the course of his study, Skokowski met regularly with those who were responsible for drafting the Town's Comprehensive Plan. He also met with the Executive Director of the Palm Beach County Department of Planning, Building and Zoning in an effort to obtain input from the County regarding anticipated development on or around Indiantown Road. In response to Skokowski's request, the Department's Executive Director promised to provide the Town with notification of any proposed zoning actions in the unincorporated areas of the County. Skokowski did not meet with any representative of either the Palm Beach County Metropolitan Planning Organization or the Treasure Coast Regional Planning Council prior to the completion of his study. On January 16, 1990, the Town Council adopted the Town of Jupiter Comprehensive Plan. The Department of Community Affairs has determined that the Plan is "in compliance." Contents of the Comprehensive Plan: A General Overview The Town's adopted Comprehensive Plan contains nine different elements: future land use; traffic circulation; housing; infrastructure; conservation; coastal management; recreation; intergovernmental coordination; and capital improvements. Each element has at least one goal 8/ and objective 9/ and has policies as well. 10/ Some elements also contain maps. One such element is the future land use element, which contains a future land use map. The map employs six land use classifications: residential; commercial; industrial; recreation; conservation; and public/institutional. Most of the land area in the Indiantown Road corridor is designated for commercial use on the future land use map. Approximately two-thirds of the total land area in the Town that is designated for commercial use on the future land use map is located in the Indiantown Road corridor. Each of the elements of the Town's adopted Comprehensive Plan was based upon "data inventory and analysis." The Town Council adopted this "data inventory and analysis" as part of the Plan. Contents of the Comprehensive Plan: Goals, Objectives and Policies The following is the lone goal set forth in the Plan's future land use element: Ensure that the future land use pattern maintains the existing low intensity, residential character, recognizes and protects the environmental quality of the Town, and allows the Town to become a full- service community 11/ serving Northern Palm Beach County. Objective 1.1 of the future land use element addresses the subject of "managed growth." It provides as follows: Direct future growth into areas served by urban services that have adequate capacity, as defined by the adopted level of service standards, which shall be incorporated into the Town's development regulations by May 1990. The following are among the policies in the future land use element that further address the subject of "managed growth:" Policy 1.1.1- All development shall be approved only if the level of service standards as set forth in Policy 1.2.1 of the Capital Improvement Element are met concurrent with the impact of the proposed development. These standards shall be integrated into the land development regulations. Policy 1.1.4- Commercial shopping centers in excess of 80,000 square feet should be located only at intersections of major arterials. Policy 1.1.5- Strip or highway commercial development shall be discouraged. Policy 1.1.6- A commercial corridor study of Indiantown Road is to be undertake[n] in 1989. This will result in a coherent, comprehensive strategy for this major roadway 12/ containing streetscape guidelines and site development standards 13/ that will be integrated into the Town's land development regulations. 14/ Policy 1.1.7- Concentrations of commercial offices, and tourist related activities shall be near locations having high accessibility. Policy 1.1.8- Non-residential outdoor storage areas shall be screened and buffered from adjacent residential uses. Policy 1.1.13- The town through its Coastal Construction Code and its future land use map shall minimize the intensity and density of future development within coastal areas vulnerable to hurricane damage. Policy 1.1.14- The impact of land use on water quality and quantity shall be considered in land use planning and regulation. This shall be assured by inclusion of provisions in the Land [D]evelopment Regulations for consideration of the impacts of proposed development on water quality and quantity. These considerations shall include the provisions of Conservation Element Policies 1.4.1-13 for surface water quality, 1.3.1-13 for groundwater quality, Infrastructure Element Policies 1.1.2 for wellfield protection, 1.5.1 for protection of potable water supply and 1.6.1-5 for protection of groundwater quality and quantity. Objective 1.2 of the future land use element addresses the subject of "land use compatibility." It provides as follows: By May 1990 the land development regulations shall contain provisions and standards which ensure that future growth patterns take into consideration topography, soil and other natural and historic resources, the intensities, densities and type of land use activities and relationship to surrounding properties, as well as providing for streetscaping, proper transition of land uses, buffering, and coordination of coastal population densities with the Palm Beach County Hurricane Evacuation Plan. The following are among the policies in the future land use element that further address the subject of "land use compatibility:" Policy 1.2.1- Where there are differences between residential uses in terms of intensity and type of units, adequate transitioning shall be accomplished through provisions such as setbacks, buffers and height limitations. The land development regulations adopted to implement the Comprehensive Plan shall contain such provisions to assure adequate transitioning. Policy 1.2.3- Where existing land use conflicts exist, the Town shall incorporate into its land development regulations provisions that address noise, dust, lighting and aesthetics. The Town shall support increasing the depth of property(s) in areas where existing lots are shallow (less than 150 feet in depth), are situated adjacent to an arterial roadway, have a commercial or industrial land use designation, and abut residentially designated land; however, the land development regulations shall contain adequate buffering and performance criteria for concerns noted above. Policy 1.2.4- Existing land uses which are not compatible with adjacent land uses, the character, natural resources or the future land use plan shall be eliminated upon redevelopment, and until that time may not be expanded. This requirement shall be included in the revision to the local development regulations to be adopted by May 1990. Objective 1.3 of the future land use element addresses the subject of "land development regulations." It provides as follows: The Town shall prepare land development regulations that effectively implement all provisions of the adopted Comprehensive Plan, contain innovative techniques for the production of affordable housing, provide a means to protect environmentally sensitive areas and maintain flexibility in site design. In addition the Town shall encourage the use of innovating land development regulations such as the Town's existing provisions for PUD and other land development techniques. The following are among the policies in the future land use element that further address the subject of "land development regulations:" Policy 1.3.3- Adopt land development regulations that shall contain specific and detailed provisions required to implement the adopted Comprehensive Plan, and which at a minimum address: subdivision of land signage wellfield and aquifer protection drainage and stormwater management periodic flooding open space needs off-street parking environmentally sensitive areas/habitats In addition, these regulations shall ensure that development orders and permits not be issued which result in a reduction of the levels of service for the affected public facility below the adopted level of service of standards as set forth in the Comprehensive Plan. Policy 1.3.4- The concept of an environmental[ly] sensitive area overlay zone will be incorporated into the current Zoning Ordinance. This concept will be folded into the new development code at the time the current Zoning Ordinance and other local development regulations are consolidated into one regulatory document. Policy 1.3.5- The [L]and [D]evelopment Regulation shall include the following non- residential land use categories, and shall incorporate the following location and intensity criteria: Commercial Neighborhood Commercial- Stores offering frequently needed goods and services to nearby residential areas. Typical activities include pharmacy, dry-cleaning, florist, hardware and garden supplies, professional offices, and personal services. Location Criteria: In areas accessible to immediate surrounding neighborhoods; Can be located in conjunction with groups of retail or highway commercial uses to achieve greater consumer volume and multi- purpose trips; When a part of a planned unit development must be situated in the interior of the project and not along an external roadway; In areas where water supply and sewerage facilities services are available. Intensity measures: Site area- minimum 20,000 sq. ft. maximum 2 acres Site coverage maximum- 35% Height limitation- 35 feet/2 stories General Commercial- Consists of a wide range of commercial goods and services serving a community-wide market. A representative sample of activities includes personal services, banking and finance offices, retail stores, nurseries, printing and publishing, auto repair, marine facilities, and medical and dental clinics. Location Criteria: At major intersections, or existing commercial core areas; Central to and/or readily accessible from all residential areas of the community; Preferably grouped with other stores in this category to achieve a combined market draw on multi-purpose trips; Not adjacent to low density, single family neighborhoods; Adjacent to Medium Density Residential areas when proper buffering is provided; Situated preferably on an arterial roadway, but never on a local street; In areas where water supply and sewerage facilities services are available. Intensity Measures: Lot coverage maximum- 35% Building height maximum- 50 feet unless parking provided under building then 60 feet. Office Commercial- Activities that generally do not entail sale or display of goods and do not require high visibility from major roadways. Typical uses include legal, financial, realty, technical and some medical service establishments. May also contain retail uses that directly serve the needs of the office businesses. Location Criteria: Location needs are often determined by type of service (attorney near courthouse, physician near hospital, etc.); Attractive or prestigious setting often desired; suitable for location near multi- family housing to serve as a transitional use between more intensive commercial and industrial uses; In some instances may locate adjacent to low density residential neighborhood only when height is limited to one story, less than 35% of project site utilized for structure(s) and adequate buffering provided; May locate in industrial park however should be located in designated tract of land in park; In areas where water supply and sewerage facilities services are available. Intensity Measures: Lot coverage maximum- 35% Building height maximum- 50 feet unless parking provided under building then 60 feet. Heavy Products Commercial- Activities that sell large or bulk products or maintains large inventories of products. These usually serve a sizeable market area and are often similar to or part of industrial activities. Building materials, heavy machinery and wholesale establishments are typical heavy commercial uses. Location Criteria: Parcels should be accessible from outlying service areas and near primary routes for shipping and receiving goods (highways, rail); Should be spatially separated from residential areas; Should not be located in proximity to other commercial activities, e.g., retail stores, offices; Suitable siting is near or in industrial areas due to similar location and transportation needs; In areas where water supply and sewerage facilities services are available. Intensity Measures: Site coverage maximum- 35% Building height maximum- 35 feet Industrial * * * Conservation * * * Public/Institutional * * * Objective 1.4 of the future land use element addresses the subject of "economic development." It provides as follows: To expand and diversify the economic base through the provision of adequate sites and timely provision of public utilities and services to stimulate such growth. Policy 1.4.1 is among the policies in the future land use element that further address the subject of "economic development." It provides as follows: Higher densities and intensities of development shall be located in areas having high accessibility and a full complement of public facilities (e.g., water, sewer), that have adequate capacity to maintain the adopted levels of service. Policies 1.1.7, 1.1.8 and 1.1.9 of the Plan's intergovernmental coordination element each reference the Indiantown Road corridor study. They provide as follows: Policy 1.1.7- Jupiter shall seek the active involvement by the Florida Department of Transportation (FDOT) in this study to provide input about the State's plans for the roadway, and FDOT shall formally review the resulting development strategy for compatibility with FDOT plans. Policy 1.1.8- Jupiter shall seek the active involvement of the Palm Beach County Department of Planning, Building, and Zoning and/or the Palm Beach County Metropolitan Planning Organization (MPO) in the study to provide input about anticipated development along and around the roadway and its impact on traffic circulation and development within Jupiter. The County and MPO shall have formal review of the resulting development strategy to ensure compatibility with County and MPO plans. Policy 1.1.9- Jupiter shall seek the active involvement of the Treasure Coast regional Planning Council in the study to provide technical assistance and informal mediation among the Town, County, MPO and FDOT, if necessary. Immediately preceding these three policies is the statement that "[a] commercial corridor study of Indiantown Road is to be undertaken by 1989 that will result in a coherent, comprehensive development strategy for this major roadway." 15/ Contents of the Comprehensive Plan: Data Inventory and Analysis The goals, objectives and policies of the Town's Comprehensive Plan can be better understood if they are read in conjunction with the "data inventory and analysis" portion of the Plan. For instance, an examination of the following excerpts from the "data inventory and analysis" portion of the Plan provides considerable assistance in understanding what the Town Council meant when it announced in the goal of the future land use element that it desired that the Town "become a full-service community serving Northern Palm Beach County:" Growth Management Philosophy Until the advent of the '80s, Jupiter was one those hidden treasures [i]n the Treasure Coast region. . . . In 1980, Jupiter was basically a "bedroom" community; however, with recent annexations, the Town now contains over 400 acres planned for industrial park usage. Therefore, Jupiter is now evolving into a "total service" community. To maintain a community that maximizes quality of life, the following growth principles and strategies will be the basis for future growth decisions: Land use decisions . . . will be made within the context of the Greater Jupiter Area 16/ since certain uses within the existing Town limits serve a "market area" that extends considerably beyond the present jurisdictional limits. It is anticipated that the Town's employment base will expand significantly in the coming years as the planned industrial parks, and office/ business centers come on line. The residential character of the Town will remain one of low intensity, a more human scale of residential living. Future residential areas will be developed only in areas with adequate human service. 17/ * * * Being the major urban hub of north county, retail and office businesses located in Jupiter depend on a population base that is considerabl[y] larger than just the existing population residing within the present Town limits. Residential areas to the north, especially along Loxahatchee River Road and to the west, primarily from the Jupiter Farms area shop and do business in Jupiter. 18/ * * * Community shopping centers require a wider market area [than neighborhood shopping centers]. 19/ The Jupiter Mall would be an example of such a retail center. Based on the Town's projected 1995 population (46,900), only one such shopping center is justified. However, because Jupiter is a commercial hub serving much of the County, north of Donald Ross Road, another such center might be justified. Prior to any approval, a market study should be required in order to avoid the problem of overcommercialization. The analysis should include all commercial development in north county, not just limited to Jupiter's corporate Town limits. Leading tenants include variety store and small department store. 20/ * * * Historically the Town has had only a minor amount of land utilized for industrial purposes. Until recent years, it has considered itself a residential, bedroom community; however, that philosophy has changed. It now sees itself as a "total" community. This means the creation of a major employment base. 21/ * * * IMPORTANT POLICY ISSUES 1. Town image, e.g., bedroom community, full service town. 22/ The following references to the Indiantown Road corridor are made in the "data inventory and analysis" portion of the Plan: Development in the Indiantown Road corridor can generally be described as uncontrolled strip commercial, often experiencing traffic congestion and presenting a poor visual image to visitors. As Jupiter has grown no definitive urban center has emerged. Growth has occurred generally along the Town's major roadways. Consider as a long-range strategy the creation of a traditional downtown. 23/ * * * Nearly 60% of the commercial/office projects have been located within the Indiantown Road corridor. . . . Over the past decade Indiantown Road (SR 706) has experienced increased periods of traffic congestion. This has occurred as commercial development along this main artery has mushroomed. Lack of lot depth as well as overall size have created a "hodgepodge" commercial development pattern along SR 706 which has lead to a traffic headache, as well as a visual eyesore. The problems of Indiantown Road are compounded since it will serve as Jupiter's major entryway once Interstate 95 is completed and the entrance on SR 706 is opened. 24/ Consideration should be given to a special overlay zone for Indiantown Road. In developing the overlay zone determining what constitutes the Indiantown Road corridor (depth of property along the roadway), establishing the desired character of the corridor, 25/ and preparing a special set of standards e.g., signage, off-street parking, buffering, to control development would be necessary. Although Indiantown Road is the most obvious example of strip commercial development other local roads are afflicted with the same problem, however maybe not to the same degree. Yet, there are several areas in and around Jupiter that are developing more in a node fashion than in a linear commercial strip. Not only is the Town beset by this commercial problem, but has been faced with possible intrusion of commercial into residential neighborhoods. Precautions need to be taken to make sure that neighborhood integrity remains intact. 26/ * * * [S]imilar to the Town's proposed land use designation within the Indiantown Road corridor, the County too, has proposed that commercial development be allowed along this roadway. A concern the Town has is the manner in which it is developed. This is especially important, because the Indiantown Road corridor is the gateway into Jupiter. To date, the development has reflected a rather non-descript, strip commercial pattern. The Town has been sufficiently concerned that it has contracted to have an urban design corridor study completed for this key roadway. 27/ Design recommendations will become a part of the Town's land development regulations. Coordination between the two governing bodies will be needed at the time the local development regulations are prepared. 28/ * * * The majority of land use conflicts occur in those areas where commercial and industrial uses abut residential neighborhoods. This has been a problem along Indiantown Road. The proposed siting of a cement batch plant in the Pennock Industrial Park created considerable controversy over the potential adverse impacts, e.g., noise, dust, light, visual image, and aesthetics. Similar concerns have been voiced over the potential negative impacts generated by strip shopping centers and car dealerships, as well. Much of the development in this major traffic corridor occurred at a time when Jupiter was a much smaller, rural community. Some of the development predates landscape and signage requirements. Because the land along Indiantown Road was subdivided over twenty years ago, many of the lots along the road are very shallow. This causes problems in providing for adequate transition and buffering from adjacent residential uses. The Town has been encouraging combining of lots to create additional depth that can allow for better site design and buffering. Also, the Town has adopted the Indiantown Road Urban Corridor Study, and will be integrating many of its recommendations into updated development regulation[s]. The study has recommended the creation of an "Indiantown Road Overlay Zone." 29 / This district will contain additional provisions related to design guidelines and streetscape standards so that development within the Town's major corridor achieves some logical, overall design. 30/ * * * IMPORTANT POLICY ISSUES . . . 2. Gateway into Town; . . . Depth of commercial along Indiantown Road; Strip commercial development vs. a node policy; . . . 9. Maintaining areas in residential use by eliminating pressures of commercial development; * * * Besides the commercial demands of the local population, [with] the opening of Interstate 95 Exit on Indiantown Road in conjunction with the existing Florida Turnpike exit on Indiantown Road, it can be expected that there will be significant increased demands for interchange commercial uses to serve the traveling public. 31/ Already a number of inquiries have been made to staff regarding the Town's position relative to development around these interchange areas. This will become the gateway to Jupiter. The commercial development pattern that ultimately emerges within the corridor can visually replicate what already exists, or can become a "memorable["] entryway leading into Jupiter. The concept of an overlay zone for the Indiantown Road corridor should be considered. 32/ * * * Most neighborhood and community shopping centers are located on major roadways, primarily at the intersections of designated arterials such as Indiantown Road and Central Boulevard, Indiantown Road and U.S. 1 and Indiantown Road and Alternate A1A. Future siting of shopping centers, especially those with 100,000 leasable floor area and up should be situated at locations having good access and sufficient roadway capacity to maintain the Town's adopted level of service. Further, they should be located so that the only access is from one road. 33/ * * * The existing major roadways identified in the functional classification are shown on Exhibit 1 . . . and are summarized below. . . Principal local arterials 34/ . . . f. Indiantown Road from U.S. 1 to west town limit Collector streets 35/ Indiantown Road from County Road A1A to U.S. 1 36/ * * * The level of service analysis shown on Exhibit 1 indicates severe capacity deficiencies for east/west travel on Indiantown Road. From Center Street to U.S. 1 and west of the Turnpike, this facility operates at Level of Service "E" which is characterized by very long vehicle delay and long traffic queues such that forced vehicular flow conditions exist much of the day. . . . The five-year programs of the Florida Department of Transportation and Palm Beach County will provide relief for some of the congestion presently experienced in Jupiter. As shown on Exhibit 2 . . . , construction is planned to be undertaken within five years to improve Indiantown Road. Indiantown Road is scheduled to be widened to a six-lane cross section from east of Center Street to east of Alternate A-1-A in fiscal year 1989/1990. Indiantown Road from Florida's Turnpike west to Jupiter Farms Road is planned to be widened to four lanes in the fiscal year 1991/1992. . . . The only existing deficiencies not currently "planned" to be improved is the six-laning of Alternate A-1-A south of the Loxahatchee River Bridge to Center Street and Indiantown Road from Alternate A-1-A to U.S. 1 to six lanes. . . . Designing and obtaining right- of-way for the Indiantown Road Intracoastal crossing (Alternate A-1-A to U.S. 1) is also programmed for FY 89/90, 90/91, respectively. The responsibility for improvement of these facilities is primarily that of the Florida Department of Transportation. 37/ * * * Improvements to Indiantown Road will greatly improve the east/west access within the Town. 38/ * * * The future major streets are shown by functional classification on Exhibit 3 . . . and are summarized as follows. . . . Principal local arterials . . . g. Indiantown Road from Alternate A-1-A to I-95. . . Collector streets Indiantown Road from County Road A-1-A to U.S. 1 39/ * * * At buildout the proposed coastal population densities in the surge vulnerable areas in the Town of Jupiter will be 31,5000 residents. This represents a 230 percent increase. The evacuation routes to accommodate evacuation vehicles will have capacities as follows: -Indiantown Road at six lanes 40/ * * * The proper strategy to follow would be to conserve and maintain or in fact upgrade some of the older residential areas in the Indiantown Road/Center Street area. The Town has been implementing such a policy. The Town has had an ongoing series of drainage and road improvement projects. This effort is continuing with the present focus on the area immediately south of Indiantown Road bounded on the east by Old Dixie. . . . The Town has taken steps since the adoption of its present land use plan to eliminate those uses inconsistent with the community's character and proposed future land uses. Some methods that have been employed are the deepening of commercial frontage along Indiantown Road, adding increased depths to buffers between conflicting land uses and not allowing the re-establishment of non- conforming land uses. 41/ * * * Intergovernmental coordination is necessary in order to implement the following policies: POLICY: A commercial corridor study is to be undertaken by 1989 that will result in a coherent, comprehensive development strategy for this major roadway. Issues for coordination/cooperation: Indiantown Road (SR 706) is owned and operated by the State. It is a major arterial for the unincorporated County area west of Jupiter, and development approved along it and in its vicinity can impact traffic conditions within Jupiter to a significant degree. Agencies involved: Florida Department of Transportation Palm Beach County Metropolitan Planning Organization (MPO) Palm Beach County Department of Planning, Building, and Zoning Treasure Coast Regional Planning Council Recommended methods for coordination/ cooperation: FDOT representatives should be involved closely in the study to provide guidance about the State's plans for the roadway, and FDOT should formally review the resultant development strategy for compatibility with FDOT plans. The Palm Beach County Department of Planning, Building, and Zoning and/or the Palm Beach County MPO should be involved closely in the study to provide guidance about anticipated development along and around the roadway and its impacts o[n] traffic circulation and development within Jupiter. The County should have formal review of the resultant development strategy to ensure compatibility with County plans. The Treasure Coast Regional Planning Council should be involved in the study to provide technical assistance and informal mediation among the Town, County, and FDOT, if necessary. 42/ The "data inventory and analysis" portion of the Plan indicates that the future land use plan includes "commercial uses" among its land use categories. It then goes on to give the following definition of such "commercial uses:" Commercial uses- means activities within land areas which are predominantly connected with the sale, rental, consumption, and distribution of products or performances of professional and non-professional services. The Town Council may approve the use of such land areas for residential purposes provided a rezoning to a residential zoning district is approved and the rezoning is implemented by a planned unit development. The following discussion appears under the subheading of "Land Use Performance Standards" in the "data inventory and analysis" portion of the Plan: The land use classification system described allows for flexibility. Specific protection should be developed and included at the time the local development code is revised to bring it into compliance with the Comprehensive Plan. It is recommended that the following criteria serve as the basis for permitting any land use change. These along with other provisions and policies of all Comprehensive Plan elements will have to be met in order to receive a development order. The recommended performance standards are as follows: Compatibility with surrounding land uses Intensity of use Adequacy of facilities -water services -sewer services -roadway access -fire and police service Environmental impact Following the recitation of the foregoing "recommended performance standards," the statement is made that "[i]n evaluating any proposed land use change as well as any other development approval requirement the Town shall take into consideration . . . whether or not the proposed change complies with the [same] location criteria" that are set forth in Policy 1.3.5 of the future land use element. The "data inventory and analysis" portion of the plan gives the following description of the three major categories of land use problems that the Town should strive to avoid or at least minimize through the planning process: Misuse of Land Widely scattered land development results in a pattern which is more costly to provide with essential services; Construction of buildings in flood prone areas results in damage to property, danger to life and added financial burdens on the [Town] for providing flood abatement measures; Land and water resources are destroyed by scattered substandard development; and Less than adequate room for expansion of businesses and industry result in congestion and inharmonious growth. Conflicting Uses of Land Encroachment of business and industrial uses into existing or emerging residential areas results in instability of these residential neighborhoods; and Unplanned mixing of various land uses results in incompatible relationships among various activities which cause deterioration of the overall environment. Overuse of Land Inadequate provision of off-street parking causes encroachment of residential neighborhoods by traffic seeking parking; Strip development along major highways results in reduced traffic capacity and increased traffic congestion; Excessive land coverage by buildings and parking areas results in inadequate open space; and Poorly conceived site and building design standards can result in overuse of land. Ordinances Creating the Indiantown Road Overlay Zoning District In March, 1990, the Town Council adopted a series of ordinances that incorporated, in all respects material to the instant case, the above-described "comprehensive strategy" that Skokowski had devised for the Indiantown Road corridor. These ordinances amended the Town's zoning code by creating the Indiantown Road Overlay Zoning District (I.O.Z.). The I.O.Z. is codified in Section 517 of the code, which describes the I.O.Z.'s purpose and intent as follows: The purpose and intent of this specialized overlay zoning district is to encourage and provide for enhanced property development within the Indiantown Road corridor. Objectives to be attained through the establishment of this district include protection of adjacent residential land uses; enhancement of the commercial status of the corridor; reduction of visual distraction through uniform sign criteria; enhancement of physical appearance through increased landscaping of public and private property; clustering of compl[e]mentary uses throughout various locations along the corridor; provisions of architectural design guidelines within specific locations along the corridor; encourage the construction of pedestrian oriented facilities in both public and private structures; installation of special landscape and architectural features at major intersections; and establish development incentives to accomplish these objectives. Before the Town Council took final action on the matter, the Town's Director of Community Development provided the Florida Department of Transportation (DOT) with a copy of what was to become Section 517 and asked DOT to favor the Town with its comments. DOT, however, declined to do so. The ordinances adopted by the Town to effectuate the creation of the I.O.Z. were Ordinances 14-90, 15-90, 20-90, 21-90, 22-90, 23-90, 24-90 and 25- 90. 61. Ordinances 20-90, 21-90, 22-90, 23-90, 24-90 and 25-90 divided the Indiantown Road Overlay Zoning District into parkway subdistricts and five urban subdistricts: the Central Boulevard District; the Center Street/Maplewood Drive District; 43/ the Civic Center District; the Alternate A1A District; and the U.S. Highway One District. Ordinance 14-90 imposed design, landscaping, and signage requirements applicable to these subdistricts. Ordinance 15-90 further restricted the land use activities permitted in these subdistricts. The underlying zoning district of most of the land area in the Indiantown Road corridor is "C-2" (Commercial, General), in which 41 commercial land use activities are permitted, 11 by right and 30, including automobile sales, by special exception. Ordinance 15-90 absolutely prohibits, without exception, anywhere from 11 to 18 of these 41 commercial land activities, depending upon the subdistrict. Automobile sales are absolutely prohibited throughout the corridor. Attachments 1-11 appended to this Final Order show each of the land use activities that were permitted, by right or special exception, in each subdistrict prior to the adoption of Ordinance 15-90 and the changes, if any, made by Ordinance 15-90 to their status as permitted activities. Relationship of the I.O.Z. to the Comprehensive Plan Section 517.3 of the Town's zoning code states that "[t]he establishment of the IOZ [as codified in Section 517] is hereby declared consistent with the Town of Jupiter Comprehensive Plan." It has not been shown that it is beyond reasonable debate that, in making this declaration, the Town Council, which only a couple of months earlier had adopted the Town of Jupiter Comprehensive Plan, was in error. A reasonable argument may be made that the I.O.Z (Section 517 of the Town's zoning code) and its component parts, including the use restrictions imposed by Ordinance 15-90, are compatible with the Plan and take action in the direction of realizing the Town's aspirations, as announced in the Plan, with respect to the Indiantown Road corridor. The I.O.Z. is a "coherent, comprehensive strategy" for the Indiantown Road corridor that employs "the concept of an overlay zone" and a "node policy" of development (as opposed to linear, "[s]trip commercial") and is reasonably designed to allow this roadway to "become a 'memorable' entryway leading into Jupiter." The use restrictions imposed by Ordinance 15-90 are an integral part of this "coherent, comprehensive strategy." They play a role in "establishing the desired character of the corridor." Ordinance 15-90 is not at variance with any of the land use designations made on the Plan's future land use map, including those designating land in the Indiantown Road corridor for commercial use. While the ordinance absolutely prohibits certain land use activities, those that it allows are in keeping with the map's land use designations. For instance, the activities it permits on land designated on the map for commercial use, which is most of the land in the corridor, are indeed "commercial uses," as that term is defined on page I-30 of the "data inventory and analysis" portion of the Plan. Because the ordinance permits these "commercial uses" throughout much of the corridor, it furthers the Plan's vision of the Indiantown Road corridor as an area where commercial development predominates. There is no inconsistency or conflict between Ordinance 15-90 and the goal of the future land use element of the Plan. It has not been demonstrated beyond reasonable debate that the ordinance will prevent the Town from fulfilling its desire, as expressed in the goal of the future land use element, of completing its transformation from a bedroom community to one that offers, in addition to housing, job opportunities and goods and services accommodating the needs of the residents of the Greater Jupiter area that cannot be adequately met by surrounding communities. To become a "total" or "full-service" community Jupiter need not offer every conceivable good and service in the marketplace. Accordingly, it may absolutely prohibit within its jurisdictional boundaries certain commercial land use activities that involve specialized goods and services that are available elsewhere in the region and still reach its goal of becoming a "total" or "full- service" community. Moreover, Ordinance 15-90 applies only to the land area within the Indiantown Road corridor, which, as noted above, contains approximately two- thirds of the Town's commercially designated land. The remaining land area in the Town designated for commercial use is unaffected by the ordinance and unencumbered by its land use restrictions. Therefore, even if, in order to become a "total" or "full-service" community, the Town was required to offer within its jurisdictional boundaries those goods and services that are unavailable in the Indiantown Road corridor as a result of Ordinance 15-90, the Town would still be able to meet this requirement because the ordinance does not preclude the Town from offering these goods and services in commercially designated areas in the Town that are outside of the Indiantown Road corridor. There is no inconsistency or conflict between Ordinance 15-90 and Policy 1.1.5 of the future land use element of the Plan. While the land use activities absolutely prohibited by Ordinance 15-90 tend to require larger lot sizes, have generally lower traffic generation rates and are less likely to be found in "[s]trip commercial" developments than certain land use activities permitted by the ordinance, it has not been shown that it is beyond reasonable debate that these prohibitions will likely result in the "[s]trip or highway commercial development" that Policy 1.1.5 seeks to discourage. Ordinance 15-90 renders ineffective neither the requirements of the Plan 44/ nor those of the remaining portions of the I.O.Z. designed to combat and prevent "[s]trip or highway commercial development." The ordinance works, not at cross-purposes with these requirements, but in tandem with them, imposing additional, rather than conflicting, restrictions on development in the Indiantown Road corridor. Under the regulatory framework established by the Town through the adoption of the Plan and the I.O.Z., a proposed development that meets the requirements of Ordinance 15-90, but is inconsistent with the anti-strip commercial provisions of the Plan and the remaining portions of the I.O.Z., will not be approved. Accordingly, Ordinance 15-90 will not have the effect of enhancing the potential for the occurrence of "[s]trip or highway commercial development" in the Indiantown Road corridor. There is no inconsistency or conflict between Ordinance 15-90 and Policy 1.1.6 of the future land use element of the Plan. As noted above, Policy 1.1.6 references the Indiantown Road corridor study and indicates that this study "will result in a coherent, comprehensive strategy for this major roadway containing streetscape guidelines and site development standards that will be integrated into the Town's land development regulations." While the use restrictions imposed by Ordinance 15-90 are neither "streetscape guidelines" nor "site development standards," Policy 1.1.6 does not mandate that the "coherent, comprehensive strategy" resulting from the Indiantown Road corridor study include only "streetscape guidelines" and "site development standards." Given that use restrictions are typically included in a "comprehensive strategy" for a roadway corridor and that there was considerable public debate preceding the adoption of the Plan concerning Skokowski's recommendation (which was ultimately incorporated in Ordinance 15-90) that certain use restrictions be included in a "comprehensive strategy" for the Indiantown Road corridor, it is reasonable to assume that, had the Town Council intended that such use restrictions not be a part of the "comprehensive strategy" envisioned in Policy 1.1.6, it would have so specified in that policy or elsewhere in the Plan. Its failure to have done so reflects that the Town Council had no such intention at the time it adopted the Plan. There is no inconsistency or conflict between Ordinance 15-90 and Policy 1.3.5 of the future land use element of the Plan. As mentioned above, Policy 1.3.5 directs, among other things, that the Town's land development regulations include, within a commercial land use category, the subcategories of "Neighborhood Commercial," "General Commercial," "Office Commercial," and "Heavy Products Commercial" and it gives a representative sample of activities that would fall into each of these subcategories. In addition, the policy prescribes location and intensity criteria for each of these subcategories. Policy 1.3.5 does not require the Town, in its land development regulations, to permit in areas that meet the location criteria of a particular subcategory all of the commercial land use activities that may fall within that subcategory. Accordingly, as it has done in Ordinance 15-90, the Town may prohibit some of these activities without running afoul of the mandate of Policy 1.3.5. Policy 1.3.5 does impose upon the Town the obligation to permit a "Neighborhood Commercial," "General Commercial," "Office Commercial," or "Heavy Products Commercial" land use activity only in those areas that, according to the policy's location criteria, are suitable for that particular activity. There has been no showing that the various commercial land use activities permitted by Ordinance 15-90 are allowed to take place in areas that do not meet the location criteria prescribed in Policy 1.3.5. If anything, the evidence establishes the contrary. There is no inconsistency or conflict between Ordinance 15-90 and Policies 1.1.7 and 1.1.8 of the intergovernmental coordination element of the Plan. As indicated above, Policies 1.1.7 and 1.1.8 provide that, in the development of the Indiantown Road corridor study, the Town "shall seek the active involvement" [of] the Florida Department of Transportation" (DOT), as well as the "Palm Beach County Department of Planning, Building and Zoning and/or the Palm Beach County Metropolitan Planning Organization (MPO)," to provide appropriate input. In conducting his study of the Indiantown Road corridor, Skokowski sought the "active involvement" of the Palm Beach County Department of Planning, Building and Zoning. He did not seek DOT's input, 45/ but the Town's Director of Community Development, prior to the Town Council's adoption of the I.O.Z., did. Accordingly, in adopting Ordinance 15-90 and the other ordinances that were based upon Skokowski's Indiantown Road corridor study, the Town Council did not act in derogation of the requirements of either Policy 1.1.7 or Policy 1.1.8 of the intergovernmental coordination element of the Plan. Petitioner's Challenge to the I.O.Z.'s Use Restrictions Petitioner owns approximately 680 acres of land in Jupiter, including land situated in the Indiantown Road corridor that is subject to the use restrictions imposed by Ordinance 15-90. It acquired 640 of these 680 acres in 1981 and the remaining acreage in 1987. Petitioner has been developing this property since its acquisition. A golf course and residential community have already been completed. Work has begun on a 40-acre commercial project located in the Maplewood Drive/Indiantown Road area. Petitioner desires to build an auto campus as part of this project, but is unable to do so because Ordinance 15-90 absolutely prohibits automobile sales from occurring on the land. On or around December 10, 1990, Petitioner sent a petition to the Mayor of Jupiter, the body of which read as follows: This petition is submitted on behalf of Restigouche, Inc. [Petitioner] pursuant to Fla. Stat. #163.3213(3) and Rule 9J-24.007 of the Florida Administrative Code. The purpose of this Petition is to challenge the consistency of such portions of [the] Indiantown Road Overlay Zoning District Ordinance, as adopted by the Town of Jupiter under Ordinance 15-90. These portions define permitted uses, uses permitted by special exception and prohibited uses within the IOZ. Section 517 of the Zoning Code was adopted by several ordinances[.] Ordinances 14-90 and 15-90 were adopted March 6, 1990. Ordinances 20-90, 21-90, 22-90, 23-90, 24-90 and 25-90 were adopted March 20, 1990. Ordinance 15-90 reduces the allowable uses of the property owners within the IOZ. The underlying zoning category for Restigouche's property in the Maplewood/Center Street District is C-2. Table 1 of the IOZ contains a list of 41 uses available to property within Zoning District C-2 by right or by special exception. The table shows that the uses for property within the IOZ have been reduced to the extent that those uses designated as "X" have moved from permitted by right or special exception to prohibited uses. Ordinance 15-90, which incorporates this down zoning, is inconsistent with the Comprehensive Plan of the Town of Jupiter as adopted by the Town Council January 16, 1990. The Comprehensive Plan does not allow for the creation of a district along the Indiantown Road Corridor that would limit uses from those as stated in the appropriate underlying zoning district. The Comprehensive Plan recognizes that a study of the development along Indiantown Road was being undertaken at the time of Comprehensive Plan adoption and acknowledges that signage, streetscape and site development criteria to enhance the visual aspects of Indiantown Road would be adopted. The Comprehensive Plan does not state that a new zoning district would be created limiting uses from those already available for the underlying zoning. Policy 1.3.5 states that land development regulation[s] shall include four designated types of commercial zoning as specified in this policy. These are Neighborhood Commercial, General Commercial, Office Commercial and Heavy Products Commercial. Specific description of policies and goals for each of these is stated. There is no policy for the recognition of a land use or zoning category specifically applicable to Indiantown Road. The Petitioner is a substantially affected person by virtue of its ownership since 1981 of property within the Maplewood/Center Street District which is part of the IOZ and is the successor developer of a previously approved Development of Regional Impact. Petitioner has expended millions of dollars in improvements to the property within the Maplewood/Center Street District in the IOZ and has contributed substantial acreage for the construction of a public school, park and fire station. The Petitioner is Restigouche, Inc., its address is 102 Nocossa Circle, Jupiter Florida 33458, telephone number (407)744-4778. The Petitioner's representative at that office is Eileen F. Letsch, Vice-President. Petitioner is represented in this matter by its counsel, Paul B. Erickson of Alley, Maass, Rogers & Lindsay, P.A., 321 Royal Poinciana Plaza, Palm Beach, Florida 33480 (407)659-1770. The relief sought by Restigouche, Inc. is recognition by the Town of Jupiter that such portions of Section 517 which diminish permissible zoning uses from those allowed in the underlying C-2 Zoning District are void and unenforceable allowing the Application for Special Exception to be considered by the Town of Jupiter. The Town did not grant the relief sought by Petitioner. Accordingly, on or about March 5, 1991, Petitioner submitted a petition to the Department of Community Affairs (Department). The body of the petition read as follows: Restigouche, Inc. ("Restigouche") files this challenge to the consistency of a land development regulation of the Town of Jupiter, Florida. Restigouche is not aware of any Agency file number for this proceeding. Restigouche, Inc. is a Florida corporation. This petition is filed by Eileen F. Letsch, Executive Vice-President, 102 Nocossa Circle, Jupiter, Florida 33458, (407)744-4778. Restigouche is represented in this Petition by Paul B. Erickson, Esq. of Alley, Maass, Rogers & Lindsay, 321 Royal Poinciana Plaza, Palm Beach, Florida 33480 (407)659-1770. Restigouche is the owner of property in the Town of Jupiter, Florida which is within the Indiantown Road Overlay Zoning District ("IOZ") created by the Town under Ordinances 14-90 and 15-90 on March 6, 1990 and applied to Restigouche's property by Ordinance 21-90 on March 20, 1990. These ordinances as enacted create Section 517 of Ordinance 10-88 which is the current zoning ordinance of the Town of Jupiter. Restigouche challenged the consistency of the IOZ with the Comprehensive Plan of the Town of Jupiter by letter to the chief elected official of the Town dated December 12, 1990. A copy of the petition is attached. The Town of Jupiter adopted its Comprehensive Plan January 20, 1990. The IOZ as it was enacted in part by Ordinances 15-90 and 21-90 is a down zoning regulation which reduces the number of permissible uses for Restigouche's property by right or special exception from 41 to 27. The IOZ as enacted in Ordinance 14-90 established landscaping and site development standards for property within the IOZ. The portions of the IOZ as adopted in Ordinances 15-90 and 21-90 are not consistent with the Comprehensive Plan of the Town of Jupiter. The Comprehensive Plan refers to the IOZ as an area of landscaping and site development standards. It does not refer to the IOZ as an area where permissible uses will be down-zoned. The Comprehensive Plan establishes mandatory criteria for the development of commercial uses within the Town in Policy 1.3.5. This does not recognize or allow a separate, restrictive commercial zoning district along Indiantown Road. The IOZ as enacted in Ordinance 15-90 should be declared invalid because it is inconsistent with the Comprehensive Plan. The Department determined that the petition substantially complied with the requirements of Rule 9J-24.007(5) and (6), Florida Administrative Code, and so notified the parties. By letter dated March 22, 1991, the Department requested the Mayor of the Town to furnish it with the following materials: those portions of the Town's land development regulations which discuss or implement the IOZ; the standards for all zoning districts which underlie the IOZ; any supportive studies regarding the IOZ; and those portions of the comprehensive plan which discuss the IOZ or densities and allowable uses in the area in question. The requested materials were furnished on or about March 28, 1991. An informal hearing on Petitioner's challenge to the I.O.Z.'s use restrictions was held in Jupiter on April 12, 1991. Representatives of both Petitioner and the Town participated in the hearing. They presented information and argument for the Department's consideration. Following the informal hearing, the Department gave the parties the opportunity to supplement what they had presented at hearing. Both parties took advantage of the opportunity. In its supplemental submission, Petitioner presented additional written argument, in which it identified with specificity those provisions of the Town of Jupiter Comprehensive Plan with which it claimed the I.O.Z.'s use restrictions were inconsistent. These specifically identified Plan provisions were Goal 1, Objectives 1.2, 1.3 and 1.4, and Policies 1.1.4, 1.1.5, 1.1.6, 1.1.7, 1.1.8, 1.1.13, 1.1.14, 1.2.3, 1.2.4, and 1.3.5 of the future land use element and Policies 1.1.7, 1.1.8 and 1.1.9 of the intergovernmental coordination element. Petitioner also submitted 1) an engineer's report supporting its position that its proposed auto campus "would have significantly less impact upon public facilities" than would a 230,500 square foot retail center constructed on its property, 2) photographs of a model of the proposed auto campus, and 3) site plans of the proposed auto campus. By letter dated April 30, 1991, the Town objected to Petitioner's submission of the engineer's report and asked that it not be considered by the Department because it was generated after the informal hearing and therefore was "not available for discussion . . . at the hearing." On May 10, 1991, following its review and consideration of not only the information, argument and materials with which it had been presented, but of the entire Town of Jupiter Comprehensive Plan as well, which it had on file, the Department issued its written decision finding that "the provisions of the Town of Jupiter Land Development Regulations contained in the IOZ which have been challenged by Petitioners 46/ in this proceeding are consistent with the Town's Comprehensive Plan." The Department explained its determination as follows in Conclusions of Law 2 and 3 of its written decision: The Town of Jupiter's IOZ is not in conflict with the Comprehensive [P]lan because the IOZ is specifically authorized by the Plan, and there are no provisions in the Plan which prohibit the Town from adjusting allowable uses within underlying zoning districts. The uses permitted in the IOZ are certainly within the permissible range of uses for the designation in the plan. The plan does not guarantee a minimal zoning category for properties within the general commercial designation. It only provides that the zoning will effectively include general commercial uses. Further, the IOZ cannot accurately be referred to as a separate zoning category as argued by the Petitioners. The IOZ modifies underlying general commercial zoning districts (which the Petitioners agree are authorized by the Plan). In fact, land development regulations such as the IOZ are considered to be innovative and are encouraged in s. 163.3202(3), F.S. There are no provisions in Chapter 163, F.S., that require comprehensive plans to identify and authorize all implementing land development regulations. Although Policy 1.3.5 lists certain uses which are eliminated or limited within the IOZ, these uses are allowed in commercial zoning districts outside the IOZ. The Petitioners may have cited portions of certain policy statements that, when taken in isolation, seem to suggest potential conflicts with the IOZ. However, the IOZ serves as the implementing solution to a problem area identified in the Plan as being of significant concern. Therefore, the IOZ, on balance, takes action in [the] direction of implementing and furthering substantive portions of the Plan. Further, the lack of recognition in the comprehensive plan of implementing land development regulations does not, by itself, constitute an inconsistency. On May 31, 1991, Petitioner filed a petition with the Division of Administrative Hearings requesting a hearing on its consistency challenge. Petitioner did so in good faith as part of its effort to convince the Town Council that the I.O.Z. should be modified in a manner that would allow Petitioner to construct its proposed auto campus in the Maplewood Drive/Indiantown Road. Petitioner hoped that the Hearing Officer would agree with its position that the I.O.Z.'s use restrictions are inconsistent with the Town of Jupiter Comprehensive Plan and that, after the Hearing Officer found these use restrictions to be inconsistent with the Plan, the Town Council would take action to eliminate them to avoid the sanctions it would face if it did not take such action.
The Issue The issue in this case is whether comprehensive plan future land use map amendment (FLUMA) 07-L25, adopted by Marion County Ordinance 07-31 on November 20, 2007, which changed the FLUM designation on 378 acres of Urban Reserve and on 17.83 acres of Rural Land to Medium Density Residential, is "in compliance," as defined in Section 163.3184(1)(b), Florida Statutes.1
Findings Of Fact The parcel that is the subject of the FLUMA at issue (the Property) is approximately 395.83 acres in size. The existing FLUM designation for 378 acres of the Property is Urban Reserve, and the remaining 17.3 acres are designated as Rural Land. Both designations allow a maximum of 1 dwelling unit per 10 acres. The FLUMA would change the designation of the entire parcel to Medium Density Residential (MDR). MDR generally allows up to four dwelling units per acre. However, Future Land Use Element (FLUE) Policy 12.5.k, which also was adopted as part of County Ordinance 07-31, limits the maximum density on the Property to two dwelling units per acre. FLUE Policy 12.5.k also requires: that development on the Property "be served by central potable water and central sanitary sewer services available concurrent with development" and be a Planned Unit Development "to address site design, buffering, and access issues"; and that NW 90th Avenue be reconstructed from U.S. Highway 27 north to the north-eastern corner of the Property and that all traffic facility improvements needed at the NW 90th Avenue/U.S. 27 intersection, including signalization if approved by the Florida Department of Transportation, be constructed prior to the issuance of any certificates of occupancy for the Property. Finally, with respect to the 17.3 acres formerly designated as Rural Land, FLUE Policy 12.5.k defers compliance with the County's Transfer of Development Rights (TDR) Program until application for assignment of a zoning classification for the land. Petitioners' Challenge Intervenors own the Property. Petitioners own property nearby in Marion County. Intervenors and Petitioners commented on the proposed FLUMA between transmittal to DCA and adoption by the County. Petitioners contend: The FLUMA is not consistent with the stormwater drainage, retention, and management policies contained in Policies 1.1.a. and 1.1.d. of the Natural Groundwater Aquifer Recharge Sub-Element of the Infrastructure Element of the Comprehensive Plan. MDR is not suitable or compatible with existing and planned development in the immediate vicinity, as required by FLUE Policy 12.3 of the Comprehensive Plan. The Board of County Commissioners failed to evaluate the FLUMA's impact on “the need for the change” as provided in FLUE Policy 12.3 of the Comprehensive Plan. The FLUMA fails to take into account its impact on “water quality and quantity, the availability of land, water and other natural resources to meet demands, and the potential for flooding,” as required by Section 187.201(15)(b)6., Florida Statutes. The FLUMA is not consistent with Transportation Policy 1.0 of the Comprehensive Plan, which states: "Marion County shall create and maintain transportation facilities that operate in a safe and efficient manner within an established level of service." The FLUMA is not consistent with the State's Comprehensive Plan in that it does not "ensure that new development is compatible with existing local and regional water supplies," as required by Section 187.201(7)(b)5., Florida Statutes. The FLUMA does not direct development away from areas without sediment cover that is adequate to protect the Floridan Aquifer and does not prohibit non-residential uses within 200 feet of a sinkhole, solution channel, or other karst feature, in violation of FLUE Policy 4.2 of the Comprehensive Plan. The FLUMA does not comply with Section 187.201(7), Florida Statutes, concerning the protection of surface and ground water quality in the State. Recharge Sub-Element Policy 1.1.a. and d. Policy 1.1 of the Natural Groundwater Aquifer Recharge Sub-Element of the Infrastructure Element of the Marion County Comprehensive Plan provides in part: The County’s land development regulations shall implement the following guidelines for stormwater management consistent with accepted engineering practices by October 1, 2007: Stormwater retention/detention basin depth will be consistent with the water management district's storm water requirements for Karst Sensitive Areas so that sufficient filtration of bacteria and other pollutants will occur. Avoidance of basin collapse due to excessive hydrostatic pressure in Karst Sensitive Areas shall be given special consideration. * * * d. Require the use of swales and drainage easements, particularly for single family residential development in Karst Sensitive Areas. These are requirements for land development regulations (LDRs); they do not apply to comprehensive plan amendments. In any event, the evidence did not prove that the site is unsuitable for the density allowed under the adopted FLUMA due to karst features. The admissible evidence presented by Petitioners regarding stormwater management in karst topography generally related to flooding problems on the property contiguous to the Property, and to a karst feature referred to as the “63rd Street Sinkhole,” which is located in the general vicinity of the Property. Fay Baird, an expert hydrologist called by Petitioners, testified that the 63rd Street Sinkhole allows stormwater run- off to enter the upper aquifer. Ms. Baird testified generally of the problems and concerns regarding development and stormwater management systems in karst topography. She testified that the Property should be properly inventoried, that specific karst features should be identified, and that any stormwater system designed or developed should take into account karst features to protect against groundwater contamination and flooding. She testified that she had not been on the Property, had not seen or reviewed core borings or other data to determine the depth and nature of the sub-surface, and was not in a position to provide opinions as to whether or not a particular stormwater management system would or could adequately protect against her concerns. Intervenors’ expert, Richard Busche, testified that a stormwater management plan like the one recommended by Ms. Baird was being developed. Compatibility under FLUE Policy 12.3 FLUE Policy 12.3 provides in pertinent part: Before approval of a future land use amendment, the applicant shall demonstrate that the proposed future land use is suitable, and the County will review, and make a determination that the proposed land use is compatible with existing and planned development in the immediate vicinity . . . . Petitioners argued that the proposed MDR development of the Property is incompatible with surrounding agricultural uses. Actually, the Property is surrounded by a mixture of agricultural and residential uses, including residential subdivisions, a golf course, and scattered large-lot residential and equestrian uses. The properties immediately to the south and east of the Property are developed residential properties and are designated MDR. Before the FLUMA, most of the Property was designated Urban Reserve under the County's Comprehensive Plan. Such land "provides for expansion of an Urban Area in a timely manner." FLUE Policies 1.24.B and 2.18. "For an Urban Reserve Area to be designated an Urban Area, it must be compact and contiguous to an existing Urban Area, and central water and sewer must be provided concurrent with development within the expanded area." FLUE Policy 2.18. The Property is compact and is contiguous to existing Urban Area designated MDR. This indicates that the County already has planned for timely conversion of the Urban Reserve land on the Property to urban uses, including MDR. It also means that the County already has determined that at least certain urban uses, including MDR, are compatible with adjacent agricultural uses. The Property is in the receiving area under the County's Farmland Preservation Policy and TDR Program in FLUE Objectives 13.0 and 13.01 and the policies under those objectives. This means that the County already has determined that residential density can be transferred to the Property from the Farmland Preservation sending areas to increase residential density up to one dwelling unit per acre. See FLUE Policy 13.6. This would constitute Low Density Residential, which is an urban use under the County's Comprehensive Plan. See FLUE Policy 1.24.A. By establishing the Farmland Preservation Policy and TDR Programs, the County already has determined that Low Density Residential is compatible with adjacent Rural Land. In addition, Low Density Residential clearly is compatible with MDR. Although not raised in the Petition, Petitioners argued that the Urban Reserve and Farmland Preservation eastern boundary was improperly moved west to NW 90th Avenue. However, that change was made prior to the adoption of Ordinance 07-31 and the FLUMA at issue in this case and is not a proper subject of this proceeding. Demonstration of Need under FLUE Policies 13.2 and 12.3 FLUE Policy 13.2 provides: The Transfer of Development Rights program shall be the required method for increasing density within receiving areas, unless, through the normal Comprehensive Plan Amendment cycle, an applicant can both justify and demonstrate a need for a Future Land Use Map (FLUM) amendment. FLUE Policy 12.3 provides: Before approval of a future land use amendment, . . . the County . . . shall evaluate its impact on: The need for the change; The availability of facilities and services; The future land use balance; and The prevention of urban sprawl as defined by Rule 9J-5.006(5)(g), Florida Administrative Code. The evidence proved that the County interprets FLUE Policy 12.3 to require need and future land use balance to be assessed within the planning districts it has established. There is no need for additional MDR in the County's Planning District 5, where the Property is located. To accommodate the projected population increase in Planning District 5 by 2010, which is the planning horizon for the County’s Comprehensive Plan, an additional 644 dwelling units are needed. There are 1,893 vacant acres of MDR available in Planning District 5. At four units per acre allowed in MDR, the County has an available supply of 7,572 MDR dwelling units in Planning District 5. In the absence of a need in Planning District 5, the County relied on a need demonstration prepared for the Intervenors by Fishkind and Associates.6 Besides being a County-wide analysis instead of a planning district analysis, the Fishkind analysis assumed a planning horizon of 2015, rather than the 2010 horizon established in the Comprehensive Plan. Finally, the Fishkind analysis applied an allocation factor to the total projected need for residential use, most of which already is supplied, resulting in a projection of residential far in excess of the incremental need for additional residential land by 2015, much less by 2010. The result of the Fishkind approach was to allocate enough land for residential use to meet the County-wide projected incremental need for additional residential land use for approximately 45 years, which is five times the calculated incremental need for 2015. Even assuming that a County-wide demonstration of need complied with Marion County's Comprehensive Plan, this is much too high an allocation ratio to use to meet the incremental need projected for a 2015 plan, much less for a 2010 plan. The expert for Intervenors, Stanley Geberer, defended the Fishkind analysis in part by stating that it was comparable to demonstrations of need accepted by DCA in other cases. However, there was no evidence that the facts of those other cases were comparable to the facts of this case. Mr. Geberer also asserted that holding the County to its 2010 planning horizon would make it impossible for the County to plan for the future. However, nothing prevents the County from revising its Comprehensive Plan to plan comprehensively for a longer timeframe. There was no evidence of any other circumstances that would demonstrate a need for the FLUMA at issue in this case. State Comprehensive Plan Policy 187.201(15)(b)6. Petitioners did not prove that the FLUMA fails to take into account its impact on "water quality and quantity, the availability of land, water and other natural resources to meet demands, and the potential for flooding." To the contrary, the evidence was that those items were taken into account as part of the FLUMA. (However, as to the FLUMA's impact on the availability of land to meet demands, see "Demonstration of Need under FLUE Policies 13.2 and 12.3," supra.) Transportation Element Objective 1.0 Transportation Element Objective 1.0 provides: Marion County shall create and maintain transportation facilities that operate in an efficient and safe manner within established levels of service. Petitioners presented no expert testimony or admissible evidence that the FLUMA will change established levels of service or result in transportation facilities operating in an unsafe or inefficient manner. Intervenors presented the testimony of Jonathan Thigpen, an expert traffic engineer, who prepared and submitted to the County a Traffic Impact Study and testified that the FLUMA would not change established levels of service or result in transportation facilities operating in an unsafe or inefficient manner. The ultimate need for transportation improvement, such as turn lanes and traffic lights to mitigate the impacts of development under the FLUMA, will be determined at later stages of development. Petitioners suggested that the FLUMA will result in delays caused by additional traffic, frustrate drivers waiting to turn east on U.S. 27, and induce large numbers of them to seek an alternative route to the north through agricultural areas, some of which have inadequate slag roads. However, Petitioners failed to prove that this result is likely. State Comprehensive Plan Policy 187.201(7)(b)5 Petitioners presented no evidence that the designation of MDR on the Property is incompatible with existing local and regional water supplies. The evidence was that adequate local and regional water supplies exist. Even if they did not exist, the consequence would be less development than the maximum allowed by the FLUMA. FLUE Policy 4.2 FLUE Policy 4.2 provides in pertinent part: In order to minimize the adverse impacts of development on recharge quality and quantity in high recharge Karst sensitive and springs protection areas, design standards for all development shall be required and defined in the LDRs to address, at a minimum, the following: * * * f. Directing development away from areas with sediment cover that is inadequate to protect the Floridian [sic] Aquifer. * * * h. Prohibiting nonresidential uses within 200 feet of a sinkhole, solution channel, or other Karst feature. This policy sets forth requirements for the content of LDRs, not FLUMAs. Petitioners presented no evidence that sediment cover on the Property is inadequate to protect the Floridan Aquifer or that any non-residential uses would be constructed within 200 feet of a sinkhole, solution channel, or other karst feature under the FLUMA. Marion County has adopted amendments to its Comprehensive Plan to protect springs and karst features.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department determine the FLUMA at issue in this case to be not "in compliance" and take further action as required by Section 163.3184(9)(b), Florida Statutes. DONE AND ENTERED this 4th day of February, 2009, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 4th day of February, 2009.
The Issue The issues in this case are: (1) whether City of Miami Ordinance 12911, which amends the Future Land Use Map (FLUM) of the City of Miami Comprehensive Neighborhood Plan (MCNP), is a small-scale development amendment, as defined by Section 163.3187(1)(c), Florida Statutes; and (2) whether Ordinance 12911 is "in compliance," as defined by Section 163.3184(1)(b), Florida Statutes. (Statutes refer to the 2007 codification.)
Findings Of Fact Based on all of the evidence, the following facts are determined: The Property Subject to the FLUM Amendment TRG-MH Venture, LTD. (TRG-MH), is a Florida limited partnership formed for the purpose of purchasing and developing a parcel of property in the southeast corner of a larger, 40- acre parcel owned by Mercy Hospital, Inc. (Mercy). TRG-MH and Mercy have executed a purchase and sale agreement for this corner parcel, which is located at approximately 3663 South Bayshore Drive in the Coconut Grove area of Miami, Florida (the Site). TRG-MH hired an architectural firm, Arquitectonica, to design on the Site a proposed residential development named 300 Grove Bay Residences (the Project). The Site, which currently serves as a paved parking lot for Mercy Hospital employees, measures 6.72 acres. The Site is abutted on the north, northwest, and northeast by the rest of the 40-acre parcel owned by Mercy and used for its hospital, professional offices, and patient and visitor parking. The tallest of these buildings is 146 feet. To the north of Mercy's property and medical complex is another 30-plus acre parcel owned by the Catholic Diocese of Miami and used for La Salle High School and a religious facility, Ermita de la Caridad. Abutting the northern boundary of the La Salle High School property is Vizcaya Museum and Gardens. To the west of the Site are a small convent, an administration building, and a modest-sized assisted living facility. To the west of these buildings is South Bayshore Drive, which is a four-lane road. Single-family residential neighborhoods are west of South Bayshore Drive. The Site is abutted on the southwest, south, southeast and east by Biscayne Bay. Grove Isle, a three-building, 18- story condominium/hotel/marina complex, is located on a small, man-made island (Fair Isle) in the Bay to the south of the Site. It is located approximately 1,300 feet from the Site and is separated from the Site by Bay water. Grove Isle has a future land use designation of Medium Density Multifamily Residential (M/D Residential) and is zoned Medium-Density Residential (R-3). However, Grove Isle is a legal nonconformity because it exceeds the densities allowed in M/D Residential and R-3. To the southwest of the Site, but separated from the Site by Bay water, are single-family and medium-density dwellings, including several multifamily structures. Petitioners Bloch and Steen reside in this neighborhood. No property zoned single-family residential (R-1) abuts the Site. Currently a paved parking lot, the Site has no archeological, environmental, or historical significance. Miami-Dade County had designated all of the City as an "Urban Infill Area." This designation is made in the County's Comprehensive Plan and is implemented in Policy LU-1.1.11 of the Future Lane Use Element (FLUE) of the City's Comprehensive Neighborhood Plan. The Parties The Vizcayans, Inc. (The Vizcayans), is a not-for- profit Florida corporation of volunteer members and a paid staff consisting of: an executive director, a membership director, and a controller. The purpose of the organization is to support the Vizcaya Museum and Gardens (Vizcaya), a publicly-owned and operated museum, through contributions and fundraising events. The Vizcayans' office at 3251 South Miami Avenue is located on the grounds of Vizcaya. The Vizcayans submitted comments in opposition to the proposed FLUM Amendment and appeared in person and through lawyers at the City Commission hearings. The Respondent and Intervenors stipulated that The Vizcayans have standing as affected persons under Sections 163.3187(3)(a) and 163.3184(1)(b), Florida Statutes, to challenge the small-scale development amendment in this proceeding based on allegations that The Vizcayans operate a business in the City. Miami-Dade County owns Vizcaya. By contract, The Vizcayans provides funds annually to Miami-Dade County for use in maintaining Vizcaya's properties and conducting educational programs. Any funds in excess of those owed to the County under the contract are used to pay staff and host fundraisers or are invested for future use. Vizcaya is governed by the County through the Vizcaya Museum and Gardens Trust, which is an agency of Miami-Dade County. Jason Bloch and Constance Steen reside in the City and own properties to the southwest of the Site. Glencoe is a not- for-profit corporation of homeowners in the Glencoe neighborhood to the southwest of the Site. Mr. Bloch formed the corporation during the pendency of the application proceedings for the primary purpose of opposing the proposed development of the Site. Bloch, Steen, and Glencoe submitted comments in opposition to the proposed FLUM amendment. Grove Isle is a not-for-profit Florida corporation of condominium owners. Grove Isle submitted comments in opposition to the proposed FLUM amendment. The City and Intervenors stipulated to Grove Isle's standing in these proceedings. The City is a political subdivision of the State of Florida. The City adopted its Comprehensive Neighborhood Plan, including its FLUM, in 1989. The Comprehensive Plan and the FLUM have been amended from time to time as allowed by law. TRG-MH is a joint venture limited partnership. Its direct and indirect participants include Ocean Land Equities, Ltd., and The Related Group. TRG-MH contracted to purchase the Site from Mercy and applied to the City for the FLUM Amendment at issue in this proceeding. TRG-MH also submitted applications for a change of zoning and MUSP on the Site. The zoning and MUSP applications, and the resulting City ordinance and resolution arising from their approval, are not at issue in this proceeding. Mercy is a not-for-profit Florida corporation that owns and operates Mercy Hospital. Mercy has contracted to sell the Site to TRG-MH. The FLUM Amendment In June 2007, TRG-MH applied to the City for a small- scale development amendment to change the Site's land use designation on the City's Future Land Use Map (FLUM) from Major Institutional, Public Facilities, Transportation and Utilities (M/I) to High Density Multifamily Residential (H/D). TRG-MH submitted its application concurrently with its applications for a zoning change from G/I to R-4 and for a MUSP. According to the FLUM Amendment application, TRG-MH was seeking a map amendment for a 6.723-acre parcel of real property. With its FLUM Amendment application, TRG-MH submitted a survey prepared and certified by surveyors Fortin, Leavy & Skiles. The survey depicted: the Site, as a parcel with a "net lot area" of 6.723 acres; a Proposed Road, measuring 1.39 acres, that wrapped around the Site on its west and north sides (the Perimeter Road); and a Private Road, also known as Tract "C" or Halissee Street, measuring .95 acres, which accesses the Site and Perimeter Road from South Bayshore Drive. Accompanying the survey was a legal description for the Site, which included a description for the proposed new Perimeter Road abutting the Site. The legal description covered an area comprising 8.11 acres. Also accompanying the application was a traffic analysis showing the impact to existing road networks of traffic resulting from the proposed MUSP application, which sought to build 300 residential units on property currently having no existing residential units. TRG-MH's applications were reviewed by the City's Planning Department and its Planning Advisory Board (PAB). The City's Planning Department recommended approval of the land use designation change. The PAB's 3-3 tie vote operated as to deny the request for a change of the land use designation recommendation. On April 26, 2007, the City Commission voted to approve the FLUM amendment application and, with modifications, the accompanying zoning and MUSP applications. (The City Commission approved the zoning change and MUSP subject to the condition that the size and scale of the Project be reduced by 25 percent across the board. Thus, for example, the height of the tallest of the three condominium buildings was reduced from approximately 411 feet to 310 feet.) The FLUM change was adopted by Ordinance 12911, which the Mayor signed on May 7, 2007. Ordinance 12911 amended the FLUM by changing the land use designation "for the property located at approximately 3663 South Miami Avenue, Miami, Florida, more particularly described in Exhibit A attached and incorporated." Exhibit A to the ordinance was the legal description included on the Fortin, Leavy, Skiles survey. The section of the MCNP entitled "Interpretation of the Future Land Use Plan Map" describes the various future land use categories in the Plan. It describes the Major Institutional future land use category as follows: Major Institutional Public Facilities, Transportation and Utilities: Areas designated as "Major Institutional, Public Facilities, Transportation and Utilities" allow facilities for federal, state and local government activities, major public or private health, recreational, cultural, religious or educational activities, and major transportation facilities and public utilities. Residential facilities ancillary to these uses are allowed to a maximum density equivalent to "High Density Multifamily Residential" subject to the same limiting conditions. Miami Comprehensive Neighborhood Plan (MCNP) at 21 (June 2006). The same section describes the H/D Residential, in pertinent part, as follows: Areas designated as "High Density Multifamily Residential" allow residential structures to a maximum density of 150 dwelling units per acre, subject to the detailed provisions of the applicable land development regulations and the maintenance of required levels of service for facilities and services included in the City's adopted concurrency management requirements. MCNP at 20 (June 2006). (By way of comparison, M/D Residential is described similarly except that the maximum density is 65 dwelling units per acre.) According to the MCNP, the FLUM land use designations "are arranged following the 'pyramid concept' of cumulative inclusion, whereby subsequent categories are inclusive of those listed previously, except as otherwise noted." Ordinance 12911 was not reviewed by the Department of Community Affairs (DCA), as required for text changes and large- scale FLUM changes to a comprehensive plan. On June 4 and 6, 2007, Petitioners filed their petitions challenging the FLUM Amendment. Generally, the Petitioners alleged that the FLUM Amendment did not qualify for treatment as a "small-scale" development amendment; was internally inconsistent with other provisions of the City's Comprehensive Neighborhood Plan; was not supported by adequate data and analysis; and was not "in compliance" with Florida's Growth Management Act and its implementing regulations. Scale of the FLUM Amendment A small-scale development amendment may be adopted if the "proposed amendment involves a use of 10 acres or fewer." § 163.3187(1)(c)(1), Fla. Stat. According to the survey and architectural plans on file with the City, the "net lot area" of the Site measures 6.72 acres. The City Zoning Code defines "net lot area" as "[t]he total area within the lot lines excluding any street rights-of- way or other required dedications." § 2502, City Zoning Code. In determining how large (in square feet of floor area) the planned Project could be, the architects were permitted, under the City's zoning regulations, to multiply the "floor area ratio" (FAR) for the High Density Multifamily Residential zoning classification by an area larger than the "net lot area." See § 401, City Zoning Code. The Zoning Code allows the maximum square footage to be calculated using the Site's "gross lot area." Id. The City Zoning Code defines "gross lot area," in pertinent part, as "[t]he net area of the lot, as defined herein, plus half of adjoining street rights-of-way and seventy (70) feet of any other public open space such as parks, lakes, rivers, bays, public transit right-of-way and the like." § 2502, City Zoning Code. If the "gross lot area" to be used to calculate the maximum square footage involves properties under different ownership, either the owners must apply jointly for a MUSP, or they must enter a covenant-in-lieu of unity of title. Properties joined by a covenant-in-lieu of unity of title need not have the same land use designation or zoning classification. If a covenant-in-lieu of unity of title is required, it need not be submitted to the City until building permits are sought. At present, no covenant-in-lieu of unity of title has been prepared or executed for the Site. The "gross lot area" used to calculate the Project's maximum square footage of floor area measured 11.44 acres. Thus, the Petitioners argued that the FLUM Amendment "involved a use" of more than 10 acres. But the application requested a land use designation change on only 6.72 acres of land. Because High-Density Multifamily Residential use will not be made of the proposed Perimeter Road, the access road known as Halissee Street, or the proposed Bay Walk, a land use designation change was not required for that acreage. Indeed, according to the amended FLUM, there is no land use designation applied to Halissee or to the northern part of the Perimeter Road. Moreover, use of Halissee Street, the Perimeter Road, and the Bay Walk is not exclusive to the 6.72 acres but will remain shared with Mercy Hospital, its patients and employees, as well as with the public. The Petitioners attempted to prove that a marina was planned to serve the development, which would involve a total use of more than ten acres for residential purposes. Even if a marina was initially contemplated, the application on file with the City does not include one, and there are no approved plans for a marina to be incorporated into the proposed residential development. No marina is required to be developed in connection with the 300 Grove Bay project. Moreover, there was unrebutted evidence that it is highly unlikely that a marina would ever be permitted under the statutes now regulating Biscayne Bay. There is no evidentiary support for including any part of Biscayne Bay in the acreage subject to the small-scale FLUM Amendment because of a possible marina so as to support the Petitioners' claim that Ordinance 12911 should not have been processed as a small-scale amendment. Suitability and Compatibility of FLUM Amendment The Site is a parking lot. It is not environmentally sensitive and has no significant natural or archeological resources that would make it unsuitable for High Density Multifamily Residential future land use. Major Institutional accommodates the Vizcaya Museum and Gardens and the Mercy Hospital complex, which are compatible with and actually part of Coconut Grove. However, as pointed out by the City and the Intervenors, Major Institutional also allows future land uses that could be less compatible with the surrounding land uses, including the Vizcaya Museum and Gardens and the residential neighborhoods of Coconut Grove. While a lower density residential future land use would be appropriate and compatible with the surrounding uses, the issue in this case is the density allowed by H/D Residential--up to 150 residential units per acre, which Petitioners contend is incompatible with the surrounding land uses and inconsistent with previous efforts to protect Vizcaya and Coconut Grove from the intrusion of high- density residential development. The Petitioners also contend that the FLUM Amendment is not suitable on the bayfront. Suitability on the Bayfront The Petitioners contend that H/D Residential is not suitable on the bayfront for reasons related mostly to aesthetics and views. While it certainly would be possible and reasonable for a community to decide not to allow dense and intense development on significant water bodies, it was not proven by a preponderance of the evidence that the City has done so, or that H/D Residential is unsuitable on the Site for that reason. 2005 Evaluation and Appraisal Report The City's 2005 Evaluation and Appraisal Report ("2005 EAR") focused on two citywide issues relevant here: (1) the preservation and enhancement of historic and similar resources; and (2) neighborhood integrity and the need to protect existing neighborhoods from incompatible development. Vizcaya Museum Gardens Industrialist James Deering built Vizcaya in 1916 as a winter home. The land Deering purchased in the early 1900s was developed into a 180-acre estate that included his Mediterranean-style home, Italianate gardens, farms, orchards, and lagoons. The mansion and gardens were designed by three well-known architects and designers and constructed using local materials. When Deering died nine years later in 1925, Vizcaya was left to his heirs, who eventually sold the south gardens and western agricultural fields to the Catholic Diocese. The southern acreage (which included the Site) was later developed into a church (Ermita de la Caridad), a school (La Salle), and medical and hospital facilities (Mercy). The Diocese sold the western acreage, which was eventually developed into single- family-home subdivisions. In the 1950s, the Deering heirs sold the remaining property, consisting of the mansion, gardens, and farm buildings, to Dade County. In 1952, Dade County opened Vizcaya to the public. Since then, the County has operated Vizcaya as a museum, which has welcomed thousands of visitors annually and is a popular site for tourists, social functions, and photo shoots. The Vizcaya mansion and gardens have historical, architectural, and botanical significance. The mansion is an "architectural masterpiece" and an "outstanding example of Italian Renaissance Revival architecture." Vizcaya has been on the National Register of Historical Places since 1977; it was designated as a City Heritage Conservation District in 1984; and, in 1994, it was designated a National Historical Landmark-- one of only three in Miami-Dade County. The southernmost part of Vizcaya's gardens is approximately 1,600 feet from the FLUM Amendment Site, and the mansion is approximately 2,300 feet from the Site. For the specific purpose of objecting to the 300 Grove Bay project, The Vizcayans commissioned the Vizcaya Viewshed Impact Assessment, which is referred to as the "balloon" study, and the Vizcaya View Corridor Study. According to the balloon study, the 300 Grove Bay condominiums would be visible from the balcony on the south side of the mansion. Although the balloon study was based on the original Project building heights and not re-done using the reduced heights in the zoning and MUSP approvals, the Petitioners' witnesses said that the Project would still be visible through the existing landscape, even at the reduced height. The Petitioners' witnesses opined that the development of 300 Grove Bay would "overpower and overshadow" the gardens on the south side of the mansion. No federal, state, or local statutes, rules or ordinances, including those relevant to this proceeding, protect the view corridors of Vizcaya's gardens. Coconut Grove The area known as Coconut Grove was settled in the late 1800s and was considered "off the beaten path" from the City which was incorporated in 1896. Coconut Grove was incorporated as a separate municipality in 1919, but in 1925 it was annexed to the City, as were five other municipalities. Petitioners' witnesses observed that Coconut Grove is the only one of these towns that has continued to retain a unique and recognizable character. Vizcaya and Mercy Hospital, including the parking lot site, are located in the northern area of Coconut Grove. Coconut Grove is primarily, but not entirely, a residential community. Coconut Grove has an active "downtown" business, commercial, and hotel district. The Petitioners maintained that the northern area of Coconut Grove is primarily single-family residential. However, it also includes a non- conforming high-density development (Grove Isle), medium-density residential, Mercy Hospital and its professional buildings, an assisted living facility, a school, a church, and governmental office buildings, as well as two museums (Vizcaya and the Museum of Science). A Coconut Grove Planning Study was commissioned and printed in 1974, but the City never adopted it; therefore, it has no official status. The Coconut Grove Neighborhood Conservation District In 2005, the City adopted by ordinance the Coconut Grove Neighborhood Conservation District (NCD-3). See § 803.3, City Zoning Code. According to the Code, a Neighborhood Conservation District is an "umbrella land use designation overlay," which allows for the tailoring of a master plan or of design guidelines for any area that meets certain criteria. See § 800, City Zoning Code. The intent of the Coconut Grove Neighborhood Conservation District is to "[p]reserve the historic, heavily landscaped character of Coconut Grove's residential areas and enhance and protect Coconut Grove's natural features such as tree canopy and green space." § 803.1, City Zoning Code. NCD-3 does not specify the High-Density, Multifamily Residential (R-4) zoning classification. But that does not mean that NCD-3 does not allow R-4. NCD-3 is enabling legislation that imposes greater restrictions within a geographic "overlay" for the zoning classifications addressed in Section 803.3. So far, NCD-3 has not addressed G/I and R-4 but only Single-Family Residential (R-1) and Commercial Districts. See § 803.3, City Zoning Code. For that reason, the ordinance does not apply to the Site. The "Grovenor Ordinance" The so-called Grovenor Ordinance was the City's response in July 2004 to the construction of a high-density residential project on property in Coconut Grove zoned "G/I Government and Institutional." The Grovenor Ordinance amended subsection of Section 401 of the City's Zoning Code to provide in pertinent part: G/I Government and Institutional Intent and Scale: The government/institutional category allows the development of facilities for federal, state and local government activities, major public or private health, recreational, cultural, religious, or educational activities, major transportation facilities, public utilities, and public and private cemeteries. Uses ancillary to these uses are allowed to a maximum density and intensity equivalent to the least intense abutting zoning district, subject to the same limiting conditions. Intensity: For residential uses: As for the least intense abutting zoning district. . . . * * * Permitted Principal Uses: Governmental and institutional uses as described in the City of Miami Comprehensive Development Plan designation of "Major Institutional, Public Facilities, Transportation and Utilities", however for accessory non-governmental or institutional uses-only such uses as may be permitted as principal uses in the least intense abutting zoning district . . . . § 401, City Zoning Code. The Grovenor Ordinance applies to property that is zoned G/I. The City's and Intervenors' witnesses testified that it applies only if G/I-zoned property ceases to be used for governmental or institutional purposes and is used instead for residential purposes. However, from the language of the ordinance itself, it is beyond fair debate that it also applies to G/I-zoned property that is used both for government or institutional uses and for ancillary residential uses. Clearly, without a FLUM change to a higher-density residential zoning category, in Coconut Grove the residential use on the Site would be restricted to the zoning classification of the "least intense abutting zoning district." Since it pertains to zoning, the Grovenor Ordinance does not directly apply to the issue of whether a FLUM amendment is "in compliance." However, it has some bearing on the proper interpretation and application of the "pyramid concept" of the MCNP's future land use designations, which is important to the issues for determination in this case. The Pyramid Concept The City and the Intervenors rely heavily on their interpretation of the MCNP's pyramid concept of cumulative future land use designations to support the FLUM Amendment in this case. According to them, the FLUM Amendment is compatible with surrounding land uses because high-density multi-family residential use already is a permitted use as a matter of right for land designated "Major Institutional." Similarly, they maintain that, under the "pyramid" concept, high-density multi- family residential use is permitted as a matter of right in all of the commercially designated land in Coconut Grove. But it is beyond fair debate that their interpretation of the "pyramid concept" is incorrect. As indicated, the "'pyramid concept' of cumulative inclusion" applies "except as otherwise noted." In the Major Institutional future land use category, it is noted that residential facilities with densities equivalent to "High Density Multifamily Residential" (i.e., up to 150 units per acre) are permitted only if "ancillary" to the listed major institutional uses. Similarly, in the General Commercial future land use category, it is noted that high-density residential uses "are allowed by Special Exception only, upon finding that the proposed site's proximity to other residentially zoned property makes it a logical extension or continuation of existing residential development and that adequate services and amenities exist in the adjacent area to accommodate the needs of potential residents." If the "pyramid concept" authorized high- density multi-family residential use as a matter of right on land designated either Major Institutional or General Commercial, there would be no reason to limit those uses by notation. Under the correct interpretation of the "pyramid concept" in the MCNP, free-standing high-density multi-family residential use of up to 150 units per acre is not already permitted as of right in either the Major Institutional or the General Commercial land use categories. Compatibility Notwithstanding the correct interpretation of the "pyramid concept" in the MCNP, the Petitioners failed to prove by a preponderance of the evidence that High Density Multi Family Residential future land use on the Site is incompatible with the surrounding uses or is inappropriate. The lower density residential and other less intense future land uses in the MCNP are buffered from the Site by Biscayne Bay and by Medium Density Multifamily Residential future land use. Vizcaya is buffered from the Site by Mercy Hospital and related medical facilities and by La Salle High School. The compatibility of a specific density of residential development on the Site with less dense residential use in Coconut Grove and with Vizcaya, including issues regarding building height and intrusion into Vizcaya's view corridors, can be addressed through zoning and MUSP proceedings. Data and Analysis Data and analysis is another matter. Because of their incorrect interpretation of the "pyramid concept" in the MCNP, the City and the Intervenors took the position that the FLUM Amendment constitutes "down-planning" and that the City was not required to perform the same level of analysis as it would have if the amendment sought a designation that permitted uses of greater impact, density, and/or intensity. The experts disagreed on whether "down-planning" is a concept in land use planning that can eliminate or minimize the requirement for data and analysis. In any event, the FLUM Amendment in this case could not be characterized as "down- planning." See Findings 57-59, supra. The MCNP's pyramid concept does not dispense with the need for data and analysis, and the data and analysis in this case was minimal and inadequate. The primary data and analysis in this case was the "Analysis for Land Use Change Request" (Analysis) that resulted from the City staff's review. After identifying the proposed land use designation and the uses permitted on it the Analysis recommended "Approval" of the FLUM Amendment and made four findings in support of "the position that the existing land use pattern in this neighborhood should be changed. These findings are as follows: It is found that the subject property is part of the Mercy Hospital and do [sic] not front South Miami Avenue. It is found that the "Major Institutional, Public Facilities, Transportation & Utilities" category allows 150 residential units per acre and the requested "High Density Multifamily Residential" designation will allow a maximum density of 150 residential units per acre. It is found that the requested change to "High-Density Multifamily Residential" designation will allow greater flexibility in developing the property at the above described location and therefore should be changed as part of the MUSP. It is found that MCNP Goal LU-1 maintains a land use pattern that (1) protects and enhances the quality of life in the city's residential neighborhoods, and (5) promotes the efficient use of land and minimizes land use conflicts. Id. (Emphasis in original.) As to the City’s third finding, a particular developer's flexibility is irrelevant to the determination of whether the land use change is consistent with the MCNP. To the extent that flexibility in general could be relevant to the inquiry, the finding was incorrect. While allowing a free- standing high-density residential project that would not otherwise be possible, the FLUM Amendment eliminates all of the non-residential uses permitted within the "Major Institutional" category. The second finding was based on the City's incorrect interpretation of the "pyramid concept" of the MCNP, which led the City to wrongly equate a primary use with an ancillary use and to simply assume no population increase would result from the FLUM Amendment, and that the FLUM Amendment would result in "down-planning." Attached to the City's Analysis was a separate "Concurrency Management Analysis," which addressed in summary form the data and analysis generated by the applicant and by the City's staff to address the "impact of [the] proposed amendment to land use map within a transportation corridor." The "Concurrency Management Analysis" also was predicated on the assumption that the FLUM change to HD Residential would not increase population. Essentially, it assumed without any data or analysis that infrastructure was available for 1,008 people living on the Site, even though the Site is being used as a parking lot at this time. This data and analysis was inadequate to support the FLUM Amendment. As to transportation, there was additional evidence of a traffic analysis performed by the City in support of the Project’s MUSP. This MUSP traffic analysis utilized a proper starting point of zero population on the Site at this time. It then projected the impact of the addition of 300 units. This was more than the 225 units ultimately approved in the MUSP but did not analyze the much larger potential increases in traffic that would be allowed under the FLUM Amendment, which is not limited to 300 units. There also was no data or analysis to show that limiting the analysis to 300 units was reasonable. It also only looked two years into the future. The MUSP traffic analysis also did not address the 2005 EAR finding that Bayshore Drive will be at level of service F by year 2025, without even any development on the Site. In short, the MUSP traffic analysis was inadequate to support the FLUM Amendment. The City and Intervenor took the position that the designation of the entire City as an urban infill area meant that every parcel is appropriate for high-density multi-family residential development. This is not correct. It is still necessary to look at comprehensive plan to determine which areas are appropriate for that kind of future land use and to have data and analysis to support it. See Payne et al. v. City of Miami et al., 32 Fla. L. Weekly D1885, *10-13 (Fla. 3d DCA Aug. 8, 2007) (on motion for rehearing). For these reasons, the Petitioners proved by a preponderance of the evidence that the data and analysis supporting the FLUM Amendment were inadequate. Inconsistency with City's Comprehensive Plan The Petitioners failed to prove beyond fair debate that the FLUM Amendment is inconsistent with any MCNP goals, objectives, or policies. State Comprehensive Plan Petitioners did not prove that the FLUM Amendment at issue is inconsistent with the State Comprehensive Plan.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Administration Commission enter a final order that the FLUM Amendment adopted by City of Miami Ordinance 12911 is not "in compliance," as defined by Section 163.3184(1)(b), Florida Statutes. DONE AND ENTERED this 10th day of July, 2008, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of July, 2008. COPIES FURNISHED: Barbara Leighty, Clerk Transportation and Economic Development Policy Unit The Capitol, Room 1801 Tallahassee, Florida 32399-0001 Jason Gonzalez, General Counsel Office of the Governor The Capitol, Suite 209 Tallahassee, Florida 32399-0001 Jorge L. Fernandez, City Attorney City of Miami Miami Riverside Center, Suite 945 444 Southwest 2nd Avenue Miami, Florida 33130-1910 Patrick J. Goggins, Esquire Patrick J. Goggins, P.A. Sun Trust Building, Suite 850 777 Brickell Avenue Miami, Florida 33131-2811 John Charles Lukacs, Esquire John C. Lukacs, P.A. 201 Sevilla Avenue, Suite 305 Coral Gables, Florida 33134-6616 H. Ray Allen, II, Esquire Carlton Fields, P.A. Post Office Box 3239 Tampa, Florida 33601-3239 Stephen J. Darmody, Esquire Shook, Hardy & Bacon, LLP Miami Center - Suite 2400 201 South Biscayne Boulevard Miami, Florida 33131-4339 Lewis W. Fishman, Esquire Lewis W. Fishman, P.A. Two Datran Center, Suite 1121 9130 South Dadeland Boulevard Miami, Florida 33156-7848 John K. Shubin, Esquire Shubin & Bass, P.A. 46 Southwest First Street, Third Floor Miami, Florida 33130-1610